Skip to main content

Full text of "Proceedings of the annual convention"

See other formats


w^^^ 


t^ 


f  \ 


i^siiS!s;im}v^i^^M^t;-^.^>yj»^:. 


REVISIONS  AND  CORRECTIONS 

AREA  Proceedings,  Volume  42  (1941) 

Changes  in  the  text  for  correction  of  typographical  errors,  and  to  take  account  of 
revisions,  deletions  and  additions  requested  by  committees  in  presenting  their  reports. 

For  revisions  of  matter  submitted  for  adoption,  see  "Discussions." 

Page  48,  see  Discussion,  page  805  for  revisions  submitted  by  committee. 

Page  49,  see  note  above. 

Page   102,   under   sub-head   "Internal   Treatment",   sixth   line,   first  word   should  be 
"sludge"  instead  of  "scale". 

Page  106,  see  Discussion,  page  822  for  revised  list  of  committees. 

Page  176,  illustration  on  lower  half  of  page  is  Fig.  5. 

Page  237,  under  sub-head  "Accelerated  Weathering  Tests",  delete  the  words  "called 
weatherometers"  in  the  first  line. 

Page  276,  under  sub-section  (d),  add  the  factor  "9Z,"  to  the  denominator  immedi- 
ately under  the  factor  "\0P"  in  the  numerator. 

Page  356,  in  eighth  line  of  the  text,  italic  letter  L  under  the  radical  should  be  lower 
case;  following  line  should  read:  "I  =  length  of  stringer  in  span,  in  inches". 

Page  358,  under  sub-head  "Welding",  sixth  line,  "n*"  should  be  "«s^". 

Page  362,  under  Section  (9),  seventh  line,  delete  the  word  "very". 

Page  363,  Assignment  3  should  read:  Non-Ballast  Type  Metal  Floor  for  Steel  Bridges. 

Page  561,  under  sub-section  5.  (a),  the  first  word  should  be  "Settling". 

Page  574,  second  line,  change  "j4-in."  to  "^-in.". 

Page  610,  under  sub-head  "Loss  of  Bolt  Tension",  first  line,  change  "1939"  to  "1938". 

Page  634,  under  sub-head  "Unloading",  delete  the  words  following  the  word  "base" 
in  the  second  line. 

Page  635,  fourth  line,  change  "double-track"  to  "multiple-track". 

Page  636,  twelfth  Une,  change  "new"  to  "newly  laid".    In  second  line  from  the  bot- 
tom of  the  page,  change  "chord  and  point"  to  "chord  end  point". 

Page  637,  see  Discussion,  page  844  for  correction  in  table. 

Page  658,  first  line  of  text  should  read  "Subcommittee  4". 

Page  1  (in  Monograph  section),  in  second  line  of  sub-title,  seventh  word  should  be 
"before"  instead  of  "by". 


PROCEEDINGS 


OF  THE 


FORTY-SECOND  ANNUAL  CONVENTION 


OF  THE 


American  Railway  Engineering 
Association 


HELD  AT  THE 


PALMER  HOUSE.  CHICAGO.  ILLINOIS 
March  11.  12  and  13.  1941 


VOLUME  42 


Copyright.  1941,  by 

AMERICAN  RAILWAY  ENGINEERING  ASSOCIATION 

CHICAGO 


BOARD  OF  DIRECTION 


President 

Geo.  S.  Fanning*,  Chief  Engineer,  Erie  Railroad,  Cleveland,  Ohio 

Acting  President 

F.  L.  C.  Bond,  Vice-President  and  General  Manager,  Canadian  National  Railways, 
Toronto,  Ont. 

Vice-President 

H.  R.  Clarke,  Engineer  Maintenance  of  Way,  Burlington  Lines,  Chicago 

Past-Presidents 

John  E.  Armstrong,  Chief  Engineer,  Canadian  Pacific  Railway,  Montreal,  Que. 
Robert  H.  Ford,  Chief  Engineer   (Retired),  Chicago,  Rock  Island  &  Pacific  Railway, 

Chicago 
A.  R.  Wilson,  Engineer,  Bridges  and  Buildings,  Pennsylvania  Railroad,  Philadelphia,  Pa. 
F.  E.  Morrow,  Chief  Engineer,  Chicago  &  Western  Indiana  Railroad  and  Belt  Railway 

of  Chicago,  Chicago 

E.  M.  Hastings,  Chief  Engineer,  Richmond,  Fredericksburg  &  Potomac  Railroad, 
Richmond,  Va. 

Directors 

C.  J.  Geyer,  Engineer  Maintenance  of  Way,  Chesapeake  &  Ohio  Railway,  Richmond,  Va. 

F.  R.  Layng,  Chief  Engineer,  Bessemer  &  Lake  Erie  Railroad,  Greenville,  Pa. 

J.  G.  Brennan,  Engineer  of  Grade  Crossings,  Association  of  American  Railroads, 
Washington,  D.  C. 

Robert  Faries,!  Assistant  Chief  Engineer — Maintenance,  Pennsylvania  Railroad,  Phila- 
delphia, Pa. 

C.  E.  Smith,!  Vice-President,  New  York,  New  Haven  &  Hartford  Railroad,  New  Haven, 
Conn. 

G.  R.  Smiley,  Chief  Engineer,  Louisville  &  Nashville  Railroad,  Louisville,  Ky. 

J.  B.  Akers,  Assistant  Chief  Engineer,  Southern  Railway  System,  Washington,  D.  C. 

A.  A.  Miller,  Chief  Engineer  Maintenance  of  Way,  Missouri  Pacific  Railroad,  St. 
Louis,  Mo. 

G.  P.  Palmer,  Engineer  Maintenance  and  Construction,  Baltimore  &  Ohio  Chicago  Ter- 
minal Railroad,  Chicago 

Armstrong  Chinn,  Chief  Engineer,  Alton  Railroad,  Chicago 


Treasurer 

W.   H.   Penfield,   Chief   Engineer,   Chicago,   Milwaukee,   St.   Paul   &   Pacific   Railroad, 
Chicago 

Secretary 

W.  S.  Lacher,  59  East  Van  Buren  Street,  Chicago 

Assistant  Secretary 
Frank  McNellis,  59  East  Van  Buren  Street,  Chicago 


*  Deceased,  January  2,  1941. 

t  Mr.   Smith  was  elected  by   the   Board  of  Direction  on  November    IS,    1940,   to   fill   the  vacancy 
caused  by  Mr.  Faries'  death  on  September  8. 


NUMERICAL  INDEX  TO  COMMITTEE  REPORTS 

Report  Discussion 

I — Roadway  and  Ballast 539  831 

3— Ties 485  845 

4 — Rail    ; 639  850 

Investigation  of  Fissures  in  Railroad  Rails 681 

5— Track   575  836 

6 — Buildings   225  875 

7 — Wood  Bridges  and  Trestles 247  868 

8 — Masonry    295  878 

9 — Highways 149  814 

10 — Signals  and  Interlocking 31  802 

II — Records  and  Accounts 369  858 

12 — Rules  and  Organization 515  864 

13 — ^Water  Service,  Fire  Protection  and  Sanitation 95  820 

14 — Yards  and  Terminals 107  854 

15 — Iron  and  Steel  Structures 355  874 

16 — Economics  of  Railway  Location  and  Operation 44  804 

17 — Wood  Preservation 489  830 

18 — Electricity    28  810 

20 — Uniform  General  Contract  Forms 37  819 

22 — Economics  of  Railway  Labor 213  823 

24 — Cooperative  Relations  With  Universities 155  815 

25 — ^Waterways  and  Harbors 87  812 

26 — Standardization 25  802 

27 — Maintenance  of  Way  Work  Equipment 173  826 

Special — Stresses  in  Railroad  Track 753,  759  848 

Special — ^Waterproofing  of  Railway  Structures 353  877 

Special — Impact    393  871 


TABLE  OF  CONTENTS 

GENERAL 

Page 

Constitution    10 

General  Information   20 


COMMITTEE  REPORTS 

Standardization 25 

Changes  in  American  Standards  Association  Committee  Representation  25 

Canadian  Engineering  Standards  Association   (CESA)    26 

Collaborating  AREA  Representatives  on  Committees  of  ASTM   26 

Discussion    802 

Electricity   28 

Developments  in  Application  of  Electricity   28 

Abstract  of  Reports  of  Electrical  Section   29 

Discussion    810 

Signals  and  Interlocking    31 

Principal  Current  Activities  of  the  Signal  Section  31 

Discussion    802 

Uniform  General  Contract  Forms 37 

Form  of  Agreement  for  Commercial  Signs  on  Railway  Property  39 

Form  of  Agreement  for  Unloading  Liquefied  Petroleum  and  Other  Gases 41 

Discussion    819 

Economics  of  Railway  Location  and  Operation   44 

Methods  for  Obtaining  a  More  Intensive  Use  of  Existing  Railway  Facilities  ....  45 
Methods   or    Formulas    for    Solution    of    Special    Problems    Relating    to    More 

Economical  and  Efficient  Railway  Operation    48 

Effect  of  Volume  of  Traffic  on  Railway  Operating  Expenses   50 

Effect  of  High  Speed  on  Railway  Operating  Expenses  56 

Economics    of    Railway    Location    and    Operation    as    Affected    by    Railway 

Electrification   68 

Train  Resistance  of  Freight  Trains  Under  Various  Conditions  of  Loading  and 

Speed    69 

Discussion    804 

Waterways  and  Harbors 87 

Breakwaters,  Bulkheads  and  Jetties   88 

Metal  and  Other  Protective  Casings  for  Pier  Structures  Under  Water  88 

Seawalls  and  Ocean  Shore  Protection,  Including  Effect  of  Wave  Action  and  Ice  88 

Reasonable  Life  of  Steel  Casings  Immersed  in  Sea  Water   90 

Discussion    812 

4 


TableofContents  5 


Page 

Water  Service,  Fire  Protection  and  Sanitation   95 

Revision  of  Manual  96 

Cause  of  and  Remedy  for  Pitting  and  Corrosion  of  Locomotive   Boiler  Tubes 

and   Sheets    96 

Cathodic  Protection  for  Prevention  of  Corrosion  of  Steel  Tanks  97 

Effect  of  Lubricating  Oil  on  Boilers  101  (a) 

Removal  of  Silica  from  Boiler  Feed  Water 101  (b) 

Principal  Current  Activities  of  the  Fire  Protection  and  Insurance  Section,  AAR..   106 
Discussion    820 

Yards  and  Terminals 107 

Revision  of  Manual    108 

General    Requirements    in    Terminal    Facilities    for    Various    Later    Types    of 

Equipment     110 

Terminal    Facilities    Required    for    Servicing    Electrical    and    -\ir    Conditioning 

Equipment  in  Passenger  Cars    112 

Scales  Used  in  Railway  Service  114 

Terminal  Facilities  Required  for  the  Care  of  Diesel  Locomotive  Equipment   ....  128 

Classification   Yards    133 

Terminal  Facihties  Required  for  the  Washing  of  Passenger  Cars  Mechanically...  134 
Terminal  Facihties  Required  for  the  Handling  of  Highway  Trucks  and  Trailers 

on  and  off  Railroad  Cars   136 

Bibliography  on  Subjects  Pertaining  to  Yards  and  Terminals  Appearing  in  Cur- 
rent  Periodicals    140 

Discussion    854 

Highways , 149 

Revision  of  Manual   150 

Design  and  Specifications  for  Highway  Crossings  at  Grade  Over  Railway  Tracks, 

Both  Steam  and  Electric  150 

Comparative  Merits  of  Various  Types  of  Grade  Crossing  Protection   151 

Drawings  of  Typical  Location  for  Grade  Crossing  Signals  152 

Methods  of  Protecting  Highway  Crossings  and  Flangeways  Against  Obstructions 

and  Damage  Caused  by  Use  or  Passage  of  Highway  Work  Equipment 152 

Discussion    814 

Cooperative  Relations  With  Universities 155 

Statement  of  Scope  and  Purpose 156 

Means  of  Bringing  to  the  Attention  of  Railway  Managements  the  Value  of  a 

Technical  Education   157 

Stimulate  a  Greater  Interest  in  the  Science  of  Transportation  Among  University 

and  College  Students    169 

Means  Whereby  Facihties  of  the  University  May  Be  Made  More  Directly  Avail- 
able for  Research  Work   1 70 

Cooperate  with  Organizations  of  University   and   College   Students   Engaged   in 

Study  or  Discussion  of  Engineering  or  Transportation  Matters  171 

Discussion    815 


Table   of   Contents 


Page 

Maintenance  of  Way  Work  Equipment 173 

Standardization  of  Parts  and  Accessories  for  Railway  Maintenance  Motor  Cars. .  174 

Devices  for  Applying  Metal  Preservatives  to  Rail  and  Fastenings 177 

Methods  of  Keeping  Data  on  Work  Equipment  183 

Pneumatic  Tired  Tractor  Equipment  194 

Impact   Wrenches    199 

Arc  Welding  Equipment   200 

Off-Track  Grading  Equipment  206 

Discussion    826 

Economics  of  Railway  Labor 213 

Analysis  of  Operations  of  Railways  That  Have  Made  Marked  Progress  in  the 

Reduction  of  Labor  Required  in  Maintenance  of  Way  Work  214 

Relative  Economy  of  Combined  vs.  Separate  Bridge  and  Building  Gangs 217 

Labor  Economies  Resulting  From  Improvements  in  Drainage  Practices 219 

Added    Labor    Economies    Resulting    from    Use    of    Off-Track    Maintenance 

Equipment     221 

Discussion    823 

Buildings 22S 

Requirements  and  Design  of  Garage  Buildings  for  Railway  Service 225 

Methods  of  Determining  the  Protective  Value  of  Paints  227 

Discussion    875 

Wood  Bridges  jmd  Trestles  247 

Revision  of  Manual   248 

Nomenclature  of  Commercial  Domestic  Softwoods  and  Hardwoods 253 

American  Lumber  Standards  for  Softwood  Lumber 262 

Simplification  of  Grading  Rules  and  Classification  of  Timber  for  Railway  Uses. .  273 

Specifications  for  Design  of  Wood  Bridges  and  Trestles  for  Railway  Loading...  273 
Recommended  Relationships  Between  the  Energy  of  Hammer  and  the  Weight  or 

Mass  of  Pile  for  Proper  Pile  Driving  282 

Fireproofing  Wood  Bridges  and  Trestles  Including  the  Placing  of  Fire  Stops 291 

Discussion    868 

Masonry 295 

Revision  of  Manual   296 

Composite  Columns  and  Pipe  Columns  (Revision  of  Manual)   298 

Progress  in  Science  and  Art  of  Concrete  Manufacture  305 

Specifications  for  Lining  Railway  Tunnels  with  Metal  Liner  Plates  and  Shotcrete  307 

Alternate  Floor  of  the  Non-Ballast  Type  (Revision  of  Manual)   309 

Progress  in  Cement  Manufacture  and  Testing  310 

Specifications  for  the  Placement  of  Concrete  Culvert  Pipe  315 

Specifications  for  Solidification  of  Masonry  Structures  by  Pressure  Grouting 319 

Specifications  for  Concrete  and  Reinforced  Concrete  Railroad  Bridges  and  Other 

Structures    321 

Specifications  for  Test  Borings   321 

Special  Requirements  for  Concrete  to  be  Deposited  Under  Water  (Revision  of 

Manual)     332 

Durability  of  Concrete  335 

Discussion    g^g 


Table    of    Contents 


Page 

Waterproofing  of  Railway  Structures  353 

Revision  of  Manual  353 

Discussion    877 

Iron  and  Steel  Structures 355 

Revision  of  Manual — Specifications  for  Steel  Railway  Bridges 356 

Instructions  for  the  Maintenance  Inspection  of  Steel  Bridges  358 

Non-Ballast  Type  Metal  Floor  Steel  Bridges  363 

Discussion    874 

Records  and  Accounts  360 

Revision  of  Manual   370 

Bibliography  on  Subjects  Pertaining  to  Records  and  Accounts   371 

Office  and  Drafting  Room  Practices   373 

Specifications  of  Materials  to  be  Used  for  Drawings  and  Drafting 373 

Standard  System  for  Filing  Drawings 375 

Recommended  Practice  to  be  Followed  with  Respect  to  Maintenance  of  Way 

Accounts  and  Statistical  Requirements  379 

Resume  of  Developments  of  the  Current  Year  in  Connection  with  Regulatory 

Bodies  and  the  Courts  379 

ICC  Valuation  Orders,  Reports  and  Records   381 

Changes  In,  Revisions  and  Interpretations  of,  ICC  Accounting  Classifications...  382 
Methods  of  Avoiding  Duplication  of  Reports  and  for  Simplifying  and  Coordinat- 
ing Work  Under  the  Requirements  of  the  ICC  and  Other  Regulatory  Bodies  385 
Discussion    858 

Impact  393 

Discussion    871 

Ties 485 

Extent  of  Adherence  to  Specifications  485 

Tie  Averages  and  Costs  per  Maintained  Mile 486 

Dimensions  of  Ties  487 

Discussion    845 

Wood  Preservation  489 

Service  Test  Records  for  Treated  Ties  490 

Piling  Used  for  Marine  Construction   508 

Destruction  by  Termites  and  Possible  Ways  of  Prevention   513 

Discussion    830 

Rules  and  Organization 515 

Rules  and  Regulations  Governing  Maintenance  of  Way  and  Structures  Employees  515 

Roadway  and  Track   532 

Bridges  and  Buildings,  Water  Service  and  Work  Equipment  534 

Signals  and  Interlocking    535 

Telephone  and  Telegraph    536 

Electrified  Territory    536 

Discussion    864 


Table    of    Contents 


Page 

Roadway  and  Ballast   539 

Physical  Properties  of  Earth  Materials,  Structural  Bearing  Power  541 

Size  of  Waterway  Openings,  Formulas   543 

Specifications  for  Vitrified  Clay  Culvert  Pipe   546 

Specifications  for  Pipe  Line  Crossings,  for  Non-inflammable  Substances 555 

Formation  of  the  Roadway — Settlement ;  Shrinkage,  Subsidence   559 

Placing  Material  in  Embankments   561 

Lighting   of   Tunnels    565 

Corrosion-Resisting  Fence  Wire    566 

Specifications  for  Wood  Fence  Posts   567 

Electrified   Fences    569 

Design  of  Signs 570 

Ballast  Section  Design   571 

Investigate  the  Use  of  Asphalt  in  Ballast  571 

Adherence  to  Stone  Ballast  Specifications,  Particularly  Size   572 

Discussion    83 1 

Track  575 

Revision  of  Manual   576 

Fastenings  for  Continuous  Welded  Rail   580 

Plans  and  Specifications  for  Track  Tools  and  Recommended  Limits  of  Wear....  584 

Plans  for  Switches,  Frogs,  Crossings,  Spring  and  SHp  Switches  595 

Corrosion  of  Rail  and  Fastenings  in  Tunnels  605 

Practicabihty  of  Using  Reflex  Units  for  Switch  Lamps  and  Targets   606 

Bolt  Tension  Necessary  for  Proper  Supporting  of  Rail  Joints 608 

Lubrication  of  Rail  on  Curves   626 

Prevention  of  Damage  Due  to  Brine  Drippings  on  Tracks  and  Structures 628 

Specifications  for  Laying  Rails   633 

Spirals  for  High  Speed  Operation    636 

Discussion    836 

Rail  639 

Revision  of  Manual   641 

Rail  Failure  Statistics    645 

Controlled-Cooled  and  Brunorized  Rail  Statistics    656 

Cause  and  Prevention  of  Rail  Battering  and  Methods  of  Reconditioning  Rail 

Ends     658 

Economic  Value  of  Different  Sizes  of  Rail  659 

Continuous  Welding  of  Rail    660 

Service  Tests  of  Various  Types  of  Joint  Bars   662 

Investigation  of  Joint  Bar  Failures   666 

Photoelastic  Investigation  of  Design  of  Joint  Bars   672 

Discussion    gjQ 

Seventh    Progress    Report    of    the    Joint    Investigation    of    Fissures    in 

Railroad  Rails ^gj 

Introduction    f-oy 

Development  of  Internal  Fissures  in  Laboratory  Tests  of  Rails  and  in  Rails  in 

Service    ,„, 

o86 


Table    of    Contents 


Seventh    Progress    Report    of    the    Joint    Investigation    of    Fissures    in 

Railroad  Rails— Continued  Page 

Field  Tests  for  Wheel  Loads   692 

Service  Records  of  Test  Rails   696 

Origin  and  Prevention  of  Shatter  Cracks  in  Rails   702 

Chemical  Composition  and  Metallographic  Structure  of  Rail  Steel   719 

Mechanical  Properties  of  Rail  Steel   726 

Non-Destructive  Tests  for  Shatter  Cracks  and  Fissures 743 

Acceptance  Tests  for  Rails-Drop  and  Bend  Tests   747 

Future  Study  of  Fissures  in  Rails 751 

Stresses  in  Railroad  Track 753 

Address  by  Dr.  A.  N.  Talbot  on  Stresses  in  Track   759 

Discussion    848 

PROCEEDINGS 

Vice-President's   Address    769 

Address  by  C.  H.  Buford  775 

Report  of  Tellers    780 

Address  by  Hon.  Clarence  F.  Lea   782 

Reports  of  Secretary  and  Treasurer  791,  801 

MONOGRAPHS— SPECIAL  REPORTS 

Mechanization  in  the  Maintenance  of  Way  Department   ml 

Report  of  the  Joint  Committee  on  Standard  Specifications  for  Concrete  and  Rein- 
forced  Concrete    m2  7 

Seventh  Progress  Report — Committee  on  Stresses  in  Railroad  Track   ml39 

MEMOIRS 

George  Stokes  Fanning    m248 

John  V.  Neubert   m251 

Robert  Faries   m253 

Lawrence  Aloysius  Downs  m25S 

William   Benson   Storey    m260 


American  Railway  Engineering 
Association 


CONSTITUTION 

Revised  to  June  7,  1940 


Article  I 

,      ..  Name,  Object  and  Location 

1.  Name 

Tlie  name  of  this  Association  shall  be  the  AMERICAN  RAILWAY  ENGINEERING 
ASSOCIATION. 

2.  Object 

The  object  of  the  Association  shall  be  the  advancement  of  knowledge  pertaining 
to  the  scientific  and  economic  location,  construction,  operation  and  maintenance  of 
railways. 

3.  Means  to  be  Used 

The  means  to  be  used  for  this  purpose  shall  be: 

(a)  The  investigation  of  matters  pertaining  to  the  object  of  the  Association 
through  Standing  and  Special  Committees. 

(b)  Meetings  for  discussion  of  reports  and  papers. 

(c)  The  publication  of  papers,  reports  and  discussions. 

4.  Conclusions 

The  conclusions  reached  shall  be  recommendatory. 

5.  Location 

The  office  of  the  Association  shall  be  located  in  Chicago,  Illinois. 

Article  II 

Membership 

1.  Classes 

The  membership  of  this  Association  shall  be  divided  into  five  classes:  Members, 
Life  Members,  Honorary  Members,  Associates  and  Junior  Members. 

2.  Qualifications 

A.  General 

(a)  An  applicant  to  be  eligible  for  membership  in  any  class  other  than  that  of 
Junior  Member  shall  be  not  less  than  twenty-five  (25)  years  of  age. 

(b)  To  be  eligible  for  election  to  or  retention  of  membership  as  a  Member  or  an 
Associate,  a  person  shall  not  be  engaged  directly  and  primarily  in  the  sale  to  railways 
of  appliances,  supplies,  patents  or  patented  services. 

B.  Member 

A  Member  shall  be: 

(a)  An  Engineer  or  Officer  in  the  service  or  on  the  retired  list  of  a  railway  cor- 
poration who  has  had  not  less  than  five  (5)  years'  of  experience  in  the  location,  con- 
struction, operation  or  maintenance  of  railways. 

Graduation  in  engineering  from  a  school  of  recognized  standing  shall  be  considered 
as  equivalent  to  three  (3)   years  of  active  practice,  and  the  satisfactory  completion  of 

10 


Constitution  11 


each  year  of  work  in  such  school,  without  graduation,  shall  be  considered  as  equivalent 
to  one-half  year  of  active  practice. 

(b)  A  Professor  of  Engineering  in  a  university  or  college  of  recognized  standing. 

(c)  An  Engineer  or  Member  of  a  public  board  or  commission  who  in  the  discharge 
of  his  regular  duties  deals  with  railway  problems. 

(d)  An  Engineering  Editor  of  a  magazine  which  deals  primarily  with  railway 
matters. 

C.  Life  Member 

A  Life  Member  shall  be  a  Member  who  has  paid  dues  for  thirty-five  (35)  years,  or 
who  has  been  retired  under  a  recognized  retirement  practice  and  has  paid  dues  for  not 
less  than  twenty-five  (25)  years. 

D.  Honorary  Member 

(a)  An  Honorary  Member  shall  be  a  person  of  acknowledged  eminence  in  railway 
engineering  or  management. 

(b)  The  number  of  Honorary  Members  shall  be  limited  to  ten  (10). 

E.  Associate 

An  Associate  shall  be: 

(a)  An  Engineer  of  a  railway  which  is  essentially  an  adjunct  of  an  industry  or 
which  is  used  primarDy  to  transport  the  products  and  materials  of  an  industry  to  and 
from  a  railway  which  is  a  common  carrier. 

(b)  A  person  qualified  by  training  and  experience  to  co-operate  with  Members 
in  the  object  of  this  Association  but  who  is  not  qualified  to  become  a  Member. 

F.  Junior  Member 

(a)  A  Junior  Member  shall  be  not  less  than  twenty-one  (21)  years  of  age  and 
shall  be  an  engineering  employee  of  a  railway  corporation  who  has  had  not  less  than 
three  (3)  years  of  experience  in  the  location,  construction,  operation  or  maintenance  of 
railways. 

Graduation  in  engineering  from  a  school  of  recognized  standing  shall  be  considered 
as  equivalent  to  three  (3)  years  of  active  practice,  and  the  satisfactory  completion  of 
each  year  of  work  in  such  school  without  graduation,  shall  be  considered  as  equivalent 
to  one-half  year  of  active  practice. 

(b)  His  membership  in  this  Association  shall  terminate  at  the  end  of  the  calendar 
year  in  which  he  becomes  thirty  (30)  years  of  age. 

(c)  He  may  make  application  for  membership  other  than  as  a  Junior  Member  at 
any  time  when  he  becomes  eligible  to  do  so. 

3.  Transfers 

The  Board  of  Direction  shall  transfer  from  one  class  of  membership  to  another, 
or  may  remove  from  membership  any  person  whose  qualifications  so  change  as  to 
warrant  such  action. 

4.  Rights 

(a)  Members  and  Life  Members  shall  have  all  the  rights  and  privileges  of  the 
Association. 

(b)  Honorary  Members  shall  have  all  the  rights  and  privileges  of  the  Association 
except  those  of  holding  elective  office,  provided,  however,  that  Members  or  Life  Members 


12  Constitution 


who  are  elected  Honorary  Members  shall  retain  all  the  rights  and  privileges  of  the 
Association. 

(c)  Associates  and  Junior  Members  shall  have  all  the  rights  and  privileges  of  the 
Association,  except  those  of  voting  and  holding  elective  office. 

Article  III 
Admission,  Resignation,  Expulsion  and  Reinstatement 

1.  Charter  Membership 

The  Charter  Membership  of  this  Association  consists  of  all  persons  elected  to  mem- 
bership before  March  ISth,  1900. 

2.  Application  for  Membership 

(a)  A  person  desirous  of  membership  in  this  Association  shall  make  application 
upon  the  form  provided  by  the  Board  of  Direction.  In  the  event  that  Junior  Membership 
is  desired,  the  application  shall  so  state. 

(b)  The  applicant  shall  give  the  names  of  at  least  three  Members  of  this  Asso- 
ciation to  whom  personally  known.  Each  of  such  Members  shall  be  requested  by  the 
Secretary  of  the  Association  to  certify  to  a  personal  knowledge  of  the  applicant  with  an 
opinion  of  the  applicant's  fitness  or  otherwise  for  membership. 

(c)  If  an  applicant  is  not  personally  known  to  three  Members  of  this  Association, 
the  names  of  at  least  three  well  known  persons  engaged  in  railway  or  allied  professional 
work  to  whom  personally  known  shall  be  given  instead.  Each  of  such  persons  shall  be 
requested  by  the  Secretary  of  the  Association  to  certify  to  a  personal  knowledge  of  the 
applicant  with  an  opinion  of  the  applicant's  fitness  or  otherwise  for  membership. 

(d)  No  further  action  shall  be  taken  upon  the  application  until  replies  have  been 
received  from  at  least  three  of  the  persons  named  by  the  applicant  as  references. 

3.  Election  to  Membership 

(a)  Upon  completion  of  the  application  in  accordance  with  Section  2  of  this  Article 
the  Board  of  Direction  through  its  Membership  Committee  shall  consider  the  application 
and  make  such  investigation  as  it  may  consider  desirable  or  necessary. 

(b)  Upon  completion  of  such  consideration  and  investigation,  each  member  of  the 
Board  of  Direction  shall  be  supplied  with  all  the  information  obtained,  together  with  the 
recommendation  of  the  Membership  Committee  as  to  the  class  of  membership,  if  any, 
to  which  the  applicant  is  eligible  and  the  admission  of  the  applicant  shall  be  canvassed  by 
letter  ballot  among  the  members  of  the  Board  of  Direction. 

(c)  In  the  event  that  an  application  has  been  made  under  the  provisions  of  Section  2, 
Paragraphs  (a)  and  (b)  of  this  Article,  a  two-thirds  affirmative  vote  of  the  entire  Board 
of  Direction  shall  be  required  for  election. 

(d)  In  the  event  that  an  application  has  been  made  under  the  provisions  of  Section  2, 
Paragraphs  (a)  and  (c)  of  this  Article,  a  unanimous  affirmative  vote  of  the  entire  Board 
of  Direction  shall  be  required  for  election. 

4.  Subscription  to  the  Constitution 

A  person  elected  to  membership  in  this  Association  shall  subscribe  to  its  Constitution 
on  the  form  prescribed  by  the  Board  of  Direction.  If  this  provision  has  not  been  com- 
plied with  within  six  months  of  notice  of  election  the  election  shall  be  considered  null 
and  void. 

5.  Honorary  Member 

A  proposal  for  Honorary  Membership  shall  be  endorsed  by  ten  or  more  Members  of 
the  Association  and  a  copy  furnished  each  member  of  the  Board   of  Direction.    The 


Constitution  13 


nominee  shall  be  declared  an  Honorary  Member  upon  receiving  a  unanimous  vote  of  the 
entire  Board  of  Direction. 

6.  Resignation 

The  Board  of  Direction  shall  accept  the  resignation,  tendered  in  writing,  of  any 
person  holding  membership  in  the  Association  whose  obligations  to  the  Association  have 
been  fully  met. 

7.  Expulsion 

Charges  may  be  preferred  in  writing  by  ten  or  more  Members  against  a  person  hold- 
ing membership  in  the  Association.  The  person  complained  of  shall  be  served  with  a 
copy  of  such  charges  and  shall  be  given  an  opportunity  to  answer  them  to  the  Board  of 
Direction.  After  such  opportunity  has  been  given,  the  Board  of  Direction  shall  take 
final  action.  A  two-thirds  affirmative  vote  of  the  entire  Board  of  Direction  shall  be 
required  for  expulsion. 

8.  Reinstatement 

(a)  A  person  having  been  a  Member,  an  Associate  or  a  Junior  Member  of  this 
Association  and  having  resigned  such  membership  while  in  good  standing  may  be 
reinstated  by  a  two-thirds  affirmative  vote  of  the  entire  Board  of  Direction. 

(b)  A  person  having  been  a  Member,  an  Associate  or  a  Junior  Member  of  this 
Association  and  having  forfeited  membership  under  the  provisions  of  Article  IV,  Sec- 
tion 3,  may,  upon  such  conditions  as  may  be  fixed  by  the  Board,  be  reinstated  by  a 
two-thirds  affirmative  vote  of  the  entire  Board  of  Direction. 


Article  IV 

Dues 

1.  Entrance  Fee 

(a)  An  entrance  fee  of  ten  dollars  (.$10.00)  shall  be  payable  to  the  Association  with 
each  application  for  membership  other  than  Junior  Membership.  This  sum  shall  be 
returned  to  an  appUcant  not  elected. 

(b)  No  entrance  fee  shall  be  payable  to  the  Association  on  account  of  Junior 
Membership. 

2.  Annual  Dues 

(a)  The  annual  dues  for  each  Member  and  each  Associate  shall  be  ten  dollars 
($10.00). 

(b)  The  annual  dues  for  each  Junior  Member  shall  be  five  dollars  ($5.00). 

(c)  Life  Members  and  Honorary  Members  shall  be  exempt  from  the  payment 
of  dues. 

3.  Arrears 

A  person  whose  dues  are  not  paid  before  April  1st  of  the  current  year  shall  be 
notified  by  the  Secretary.  If  the  dues  are  still  unpaid  on  July  1st  further  notice  shall 
be  given  and  a  delinquent  Member  shall  lose  the  right  to  vote.  If  the  dues  remain 
unpaid  October  1st  the  person  shall  be  notified  on  the  form  prescribed  by  the  Board  of 
Direction,  and  shall  no  longer  receive  the  publications  of  the  Association.  If  the  dues 
are  not  paid  by  December  31st,  the  person  shall  forfeit  membership  without  further  action 
or  notice,  except  as  provided  for  in  Section  4  of  this  Article. 


14  Constitution 


4.  Remission  of  Dues 

The  Board  of  Direction  may  extend  the  time  of  payment  of  dues,  and  may  remit 
the  dues  of  any  Member,  Associate  or  Junior  Member  who,  for  good  reason,  is  unable 
to  pay  them. 

Article  V 

Officers 

1.  Officers 

(a)  The  officers  of  the  Association  shall  be  a  President,  two  Vice-Presidents,  nine 
Directors,  a  Secretary  and  a  Treasurer. 

(b)  The  President,  the  Vice-Presidents  and  the  Directors,  together  with  the  five 
latest  living  Past-Presidents  continuing  to  be  Members,  shall  constitute  the  Board  of 
Direction,  in  which  the  government  of  the  Association  shall  be  vested,  and  shall  act  as 
Trustees  and  have  the  custody  of  all  property  belonging  to  the  Association.  The 
President,  the  Vice-Presidents  and  the  Directors  shall  be  Members. 

(c)  The  Secretary  and  the  Treasurer  shall  be  appointed  by  the  Board  of  Direction. 

2.  Term  of  Office 

The  term  of  office  of  the  President  shall  be  one  year,  of  the  Vice-Presidents  two 
years  and  of  the  Directors  three  years.  The  term  of  each  shall  begin  at  the  close  of 
the  Annual  Convention  at  which  elected  and  continue  until  a  successor  is  qualified. 
All  other  officers  and  employees  shall  hold  office  or  position  during  the  pleasure  of  the 
Board  of  Direction. 

3.  Officers  Elected  Annually 

(a)  There  shall  be  elected  at  each  Annual  Convention  a  President,  one  Vice- 
President  and  three  Directors. 

(b)  The  candidates  for  President  and  for  Vice-President  shall  be  selected  from 
the  members  or  past  members  of  the  Board  of  Direction. 

4.  Conditions  of  Re-election  of  Officers 

A  President  shall  be  ineligible  for  re-election.  Vice-Presidents  and  Directors  shall 
not  be  eligible  for  re-election  to  the  same  office  until  at  least  one  full  term  has  elapsed 
after  the  end  of  their  respective  terms. 

5.  Vacancies  in  Offices 

(a)  When  a  vacancy  occurs  in  the  office  of  President  the  duties  shall  be  performed 
by  the  senior  Vice-President. 

(b)  When  a  vacancy  occurs  in  the  office  of  either  Vice-President  the  Board  of 
Direction  shall  select  a  Vice-President  from  among  the  Directors.  A  Vice-Presidency 
shall  not  be  considered  vacant  when  one  of  the  Vice-Presidents  is  filling  a  vacancy  in 
the  Presidency. 

(c)  A  vacancy  in  the  office  of  Director  shall  be  filled  by  the  Board  of  Direction. 

(d)  An  incumbent  in  any  office  for  an  unexpired  term  shall  be  eligible  for  re- 
election to  the  office  held;  provided  however,  that  anyone  appointed  to  fill  a  vacancy  as 
Director  within  six  months  after  the  term  commences  shall  be  considered  as  coming 
within  the  provisions  of  Article  V,  Section  4. 


Constitution  IS 


6.     Vacation  of  Office 

(a)  When  an  elected  officer  ceases  to  be  a  Member  of  the  Association,  as  provided 
in  Article  II,  the  office  shall  be  vacated. 

(b)  In  case  of  the  disability  of  or  neglect  in  the  performance  of  duty  by  an  officer, 
the  Board  of  Direction,  by  a  two-thirds  affirmative  vote  of  the  entire  Board,  shall  have 
the  power  to  declare  the  office  vacant. 


Article  VI 
Nomination  and  Election  of  Officers 

1.  Nominating  Committee 

(a)  There  shall  bo  a  Nominating  Committee  composed  of  the  five  latest  living 
Past-Presidents  of  the  Association,  who  are  Members,  and  five  Members  who  are  not 
officers. 

(b)  The  five  Members  who  are  not  officers  shall  be  elected  annually  for  a  term 
of  one  year,  when  the  officers  of  the  Association  are  elected. 

(c)  The  senior  Past-President  who  is  a  member  of  the  Committee  shall  be  the 
Chairman  of  the  Committee.  In  the  absence  of  the  senior  Past-President  from  a  meet- 
ing of  the  Committee  the  Past-President  next  in  seniority  present  shall  act  as  Chairman. 

2.  Method  of  Nominating 

(a)  Prior  to  December  1st  of  each  year  the  Chairman  shall  call  a  meeting  of  the 
Committee  at  a  convenient  place,  at  which  nominees  for  the  various  elective  offices 
shall  be  selected  as  follows: 

Number  of  Candi- 
Nuntber  of  Candi-  dates  to  be 

dates  to  be  named  elected  at  the 

by  the  Nominating       Annual  Election 
Office  to  be  Filled  Committee.  of  Officers. 

President    1  1 

Vice-President    1  1 

Directors    9  3 

Nominating    Committee    10  S 

(b)  The  Chairman  of  the  Nominating  Committee  shall  send  the  names  of  the 
nominees  to  the  President  and  Secretary  not  later  than  December  iSth  of  the  same  year, 
and  the  Secretary  shall  report  them  to  the  members  of  the  Association  on  a  printed 
slip  not  later  than  January  1st  following. 

(c)  At  any  time  between  January  1st  and  February  1st  any  ten  or  more  Members 
may  send  to  the  Secretary  additional  nominations  for  any  elective  office  for  the  ensuing 
year  signed  by  such  Members. 

(d)  If  any  person  nominated  shall  be  found  by  the  Board  of  Direction  to  be 
ineligible  for  the  office  for  which  nominated,  or  should  a  nominee  decline  such  nomination, 
the  name  shall  be  withdrawn.  The  Board  of  Direction  may  fill  any  vacancies  that  may 
occur  in  the  list  of  nominees  up  to  the  time  the  ballots  are  sent  out. 

3.  Ballots  Issued 

Not  less  than  thirty  days  prior  to  each  Annual  Convention,  the  Secretary  shall  issue 
a  ballot  to  each  voting  member  of  record  in  good  standing,  listing  the  several  candidates 
to  be  voted  upon.    When  there  is  more  than  one  candidate  for  any  office,  the  names 


16  Constitution 


shall  be  arranged  on  the  ballot  in  the  order  that  shall  be  determined  by  lot  by  the 
Nominating  Committee.  The  ballot  shall  be  accompanied  by  a  statement  giving  for 
each  candidate,  his  record  of  membership  and  activities  in  this  Association. 

4.  Substitution  of  Names 

Members  may  erase  names  from  the  printed  ballot  list  and  may  substitute  the  name 
or  names  of  any  other  person  or  persons  eligible  for  any  office,  but  the  number  of  names 
voted  for  each  office  on  the  ballot  must  not  exceed  the  number  to  be  elected  at  that 
time  to  such  office. 

5.  Ballots 

(a)  Ballots  shall  be  placed  in  an  envelope,  sealed  and  endorsed  with  the  name  of 
the  voter,  and  mailed  to  or  deposited  with  the  Secretary  at  any  time  previous  to  the 
closure  of  the  polls. 

(b)  A  voter  may  withdraw  a  ballot,  and  cast  another,  at  any  time  before  the  polls 
close. 

(c)  Ballots  not  endorsed  or  from  persons  not  qualified  to  vote  shall  not  be  counted. 

(d)  The  ballots  and  envelopes  shall  be  preserved  for  not  less  than  ten  days  after 
the  vote  is  canvassed. 

6.  Closure  of  Polls 

The  polls  shall  be  closed  at  twelve  o'clock  noon  on  the  second  day  of  the  Annual 
Convention,  and  the  ballots  shall  be  counted  by  tellers  appointed  by  the  Presiding 
Officer. 

7.  Election 

(a)  The  persons  who  shall  receive  the  highest  number  of  votes  for  the  offices  for 
which  they  are  candidates  shall  be  declared  elected. 

(b)  In  case  of  a  tie  between  two  or  more  candidates  for  the  same  office,  the 
Members  present  at  the  Annual  Convention  shall  elect  the  officer  by  ballot  from  the 
candidates  so  tied. 

(c)  The  Presiding  Officer  shall  announce  at  the  convention  the  names  of  the 
officers  elected  in  accordance  with  this  Article. 


Article  VII 

Management 

1.  President 

The  President  shall  have  general  supervision  of  the  affairs  of  the  Association,  shall 
preside  at  meetings  of  the  Association  and  of  the  Board  of  Direction,  and  shall  be 
ex-officio  a  member  of  all  committees,  except  the  Nominating  Committee. 

2.  Vice-Presidents 

The  Vice-Presidents,  in  order  of  seniority,  shall  preside  at  meetings  in  the  absence 
of  the  President  and  shall  discharge  the  duties  in  case  of  a  vacancy  in  the  office. 


Constitution  17 


3.  Treasurer 

The  Treasurer  shall  receive  all  monies,  deposit  the  same  in  the  name  of  the 
Association,  receipt  to  the  Secretary  therefor  and  invest  all  funds  not  needed  for  current 
disbursements  as  shall  be  ordered  by  the  Board  of  Direction.  The  Treasurer  shall  pay 
all  bills,  when  properly  certified  and  audited  by  the  Finance  Committee,  and  make  such 
reports  as  may  be  called  for  by  the  Board  of  Direction. 

4.  Secretary 

The  Secretary,  shall  be  under  the  direction  of  the  President  and  Board  of  Direction, 
the  Executive  Officer  of  the  Association  and  shall  attend  the  meetings  of  the  Association 
and  of  the  Board  of  Direction,  prepare  the  business  therefor,  and  duly  record  the 
proceedings  thereof.  The  Secretary  shall  see  that  the  monies  due  the  Association  are 
collected  and  without  loss  transferred  to  the  custody  of  the  Treasurer,  and  shall  personally 
certify  to  the  accuracy  of  all  bills  or  vouchers  on  which  money  is  to  be  paid.  The  Sec- 
retary is  to  conduct  the  correspondence  of  the  Association,  keep  proper  record  thereof, 
and  perform  such  other  duties  as  the  Board  of  Direction  may  prescribe. 

5.  Auditing  of  Accounts 

The  accounts  of  the  Treasurer  and  of  the  Secretary  shall  be  audited  annually  by 
an  approved  accountant  under  the  direction  of  the  Finance  Committee  of  the  Board 
of  Direction. 

6.  Board  of  Direction 

(a)  The  Board  of  Direction  shall  manage  the  affairs  of  the  Association,  and  shall 
have  full  power  to  control  and  regulate  all  matters  not  otherwise  provided  in  the 
Constitution. 

(b)  The  Board  of  Direction  shall  meet  within  thirty  days  after  each  Annual 
Convention,  and  at  such  other  times  as  the  President  may  direct.  Special  meetings 
shall  be  called  on  request,  in  writing,  of  five  members  of  the  Board  of  Direction. 

(c)  Seven  members  of  the  Board  of  Direction  shall  constitute  a  quorum. 

(d)  At  the  first  meeting  of  the  Board  of  Direction  after  the  Annual  Convention, 
the  following  committees,  each  consisting  of  not  less  than  three  members,  shall  be 
appointed  by  the  President  from  the  Board  of  Direction  and  they  shall  report  to  and 
perform  their  duties  under  the  supervision  of  the  Board  of  Direction. 

Finance 

Publication 

Outline  of  Work  of  Committees 

Personnel  of  Committees 

Membership 

Manual 

7.  Duties  of  the  Committees  of  the  Board  of  Direction 

(a)  Finance  Committee 
The  Finance  Committee  shall  have  immediate  supervision  of  the  accounts  and 
financial  affairs  of  the  Association;  shall  approve  all  bills  before  payment,  and  shall 
make  recommendations  to  the  Board  of  Direction  as  to  the  investment  of  monies  and 
other  financial  matters.  The  Finance  Committee  shall  not  have  the  power  to  incur 
debts  or  other  obligations  binding  the  Association,  nor  authorize  the  payment  of  money 


18  Constitution 


other  than  the  amounts  necessary  to  meet  ordinary  current  expenses  of  the  Association, 
except  by  authority  of  the  Board  of  Direction. 
(b)     Publication  Committee 

The  Publication  Committee  shall  have  general  supervision  of  the  publications  of 
the  Association.  The  Publication  Committee  shall  not  have  the  power  to  incur  debts 
or  other  obligations  binding  the  Association,  nor  authorize  the  payment  of  money  except 
by  authority  of  the  Board  of  Direction. 

(c)'    Committee  on  Outline  of  Work  of  Committees 

The  Committee  on  Outline  of  Work  of  Committees  shall  prepare  and  present  to  the 
Board  of  Direction  a  report  of  the  subjects  to  be  investigated,  considered  and  reported 
upon  by  the  standing  and  special  committees  of  the  Association  during  the  ensuing  year. 

(d)  Committee  on  Personnel  of  Committees 

The  Committee  on  Personnel  of  Committees  shall  prepare  and  present  to  the  Board 
of  Direction  a  list  of  chairman,  vice-chairmen  and  members  of  the  standing  and  special 
committees  of  the  Association  for  the  ensuing  year. 

(e)  Membership  Committee 

The  Membership  Committee  shall  make  investigation  of  applicants  for  membership 
and  shall  make  recommendations  to  the  Board  of  Direction  with  reference  thereto. 

(f)  Manual  Committee 

The  Manual  Committee  shall  study  and  recommend  to  the  Board  of  Direction  as 
to  the  manner  in  which  the  material  adopted  for  addition  or  deletion  from  the  Manual 
shall  be  handled. 

8.  Standing  Committees 

The  Board  of  Direction  may  appoint  standing  committees  to  investigate,  consider 
and  report  upon  questions  pertaining  to  railway  location,  construction,  operation  and 
maintenance. 

9.  Special  Committees 

The  Board  of  Direction  may  appoint  special  committees  to  examine  into  and 
report  upon  any  subject  connected  with  the  objects  of  this  Association. 

10.  Discussion  by  Non-Members 

The  Board  of  Direction  may  invite  discussions  of  reports  from  persons  not  members 
of  the  Association. 

11.  Sanction  of  Act  of  Board  of  Direction 

An  act  of  the  Board  of  Direction  which  shall  have  received  the  expressed  or  implied 
sanction  of  the  membership  at  the  next  annual  convention  of  the  Association  shall  be 
deemed  to  be  the  act  of  the  Association. 

Article  VIII 

Meetings 
1.    Annual  Convention 

(a)  The  Annual  Convention  of  the  Association  shall  be  held  in  the  City  of 
Chicago,  Illinois.  The  convention  shall  open  on  a  Tuesday  in  the  month  of  March  to 
be  determined  by  the  President. 


Constitution  19 


(b)  The  Secretary  shall  notify  all  members  of  the  Association  of  the  time  and 
place  of  the  Annual  Convention  at  least  thirty  (30)  days  in  advance  thereof. 

(c)  The  order  of  business  at  the  Annual  Convention  of  the  Association  shall  be: 

Reading  of  the  Minutes  of  the  last  meeting 

Address  of  the  President 

Reports  of  the  Secretary  and  the  Treasurer 

Reports  of  Committees 

Unfinished   Business 

New  Business 

Installation  of  Officers 

Adjournment 

(d)  This  order  of  business  may  be  changed  by  a  majority  vote  of  Members  present. 

(e)  The  proceedings  shall  be  governed  by  "Robert's  Rules  of  Order"  except  as 
otherwise  herein  provided. 

(f)  Discussions  shall  be  limited  to  members  and  to  those  others  invited  by  the 
Presiding  Officer  to  speak. 

2.  Special  Meetings 

Special  meetings  of  the  Association  may  be  called  by  the  Board  of  Direction  and 
special  meetings  shall  be  so  called  by  the  Board  of  Directiom  upon  written  request  of 
thirty  Members.    The  request  shall  state  the  purpose  of  such  meeting. 

The  call  for  such  special  meeting  shall  be  issued  not  less  than  ten  (10)  days  in 
advance  and  shall  state  the  purpose  and  place  of  the  meeting.  No  other  business  shall 
be  taken  up  at  such  meeting. 

3.  Quorum 

Twenty-five  (25)  Members  shall  constitute  a  quorum  at  all  meetings  of  the 
Association. 


Article  IX 

Amendment 
1.    Amendment 

Proposed  Amendment  of  this  Constitution  shall  be  made  in  writing,  shall  be  signed 
by  not  less  than  ten  Members  and  shall  be  acted  upon  in  the  following  manner: 

The  amendment  shall  be  presented  to  the  Secretary,  who  shall  send  a  copy  to  each 
member  of  the  Board  of  Direction  as  soon  as  received.  If  a  majority  of  the  entire 
Board  of  Direction  so  votes  the  matter  shall  be  submitted  to  the  Association  by  letter- 
baUot. 

The  Board  of  Direction  shall  canvass  the  ballots  which  have  been  received  within 
sixty  days  after  the  date  of  issue  of  the  letter-ballot  and  if  two-thirds  (%)  of  the  votes 
so  received  are  in  the  affirmative  the  amendment  shall  be  declared  adopted  and  shall 
become  immediately  effective. 

The  result  shall  be  announced  at  the  next  Annual  Convention. 


20  General    Information 

GENERAL  INFORMATION 

(Revised  to  March,   1941.) 

GENERAL  RULES  FOR  THE  PREPARATION,  PUBLICATION  AND 
CONSIDERATION  OF  COMMITTEE  REPORTS 

(A)  Appointment  of  Committees  and  Outline  of  Work 

Standing  Committees 

1.  The  following  are  Standing  Committees: 

1.  Roadway  and  Ballast. 

3.  Ties. 

4.  Rail. 

5.  Track. 

6.  Buildings. 

7.  Wood  Bridges  and  Trestles. 

8.  Masonry. 

9.  Highways. 

10.  Signals  and  Interlocking. 

11.  Records  and  Accounts. 

13.  Water  Service,  Fire  Protection  and  Sanitation. 

14.  Yards  and  Terminals. 

15.  Iron  and  Steel  Structures. 

16.  Economics  of  Railway  Location  and  Operation. 

17.  Wood  Preservation. 

18.  Electricity. 

20.  Uniform  General  Contract  Forms. 
22.  Economics  of  Railway  Labor. 

24.  Cooperative  Relations  with  Universities. 

25.  Waterways  and  Harbors. 

26.  Standardization. 

27.  Maintenance  of  Way  Work  Equipment. 

28.  Clearances. 

Special  Committees 

2.  Special  Committees  will  be  appointed  from  time  to  time,  as  may  be  deemed 
expedient,  in  the  manner  prescribed  by  Article  VII,  Section  9,  of  the  Constitution. 

The  following  are  Special  Committees: 

Waterproofing  of  Railway  Structures. 
Impact. 

Personnel  of  Committees 

3.  The  personnel  of  all  committees  will  continue  from  year  to  year,  except  when 
changes  are  announced  by  the  Board  of  Direction.  It  is  desirable  that  ten  percent  of  the 
membership  of  each  committee  be  changed  each  year. 

Members  of  committees  who  do  not  attend  meetings  of  committees  during  the  year 
or  render  service  by  correspondence  will  be  relieved  and  the  vacancies  filled  by  the 
Board  at  the  succeeding  annual  convention. 

Outline  of  Work 

4.  As  soon  as  practicable  after  the  reports  of  committees  for  the  current  year  have 
been  filed  with  the  secretary,  the  Board  of  Direction  will  assign  to  the  committees, 
subjects  which  in  its  judgment  should  preferably  be  considered  during  the  succeeding 
year,  provided,  however,  that  such  assignments  may  be  subject  to  revision  until  the  close 
of  the  Annual  Convention.  Such  assignments  should  not  be  deviated  from  except  in 
extreme  cases  and  then  not  until  approved  by  the  Committee  on  Outline  of  Work. 


♦Committee  12 — Rules  and  Organization  and  the  Special  Committee  on  Stresses  in  Railroad  Track 
have  been  discontinued  by  action  of  the  Board  of  Direction.  The  Committee  on  Research  Administration 
will  supervise  investigations  on  track  stresses. 


General    Information  21 

_  ,  (B)  Preparation  of  Committee  Reports 

General 

5.  The  objectives  of  the  Association  are  advanced  through  the  work  of  the  com- 
mittees in  two  ways — (1)  the  development  of  useful  information  pertinent  to  their  assign- 
ments to  be  presented  to  the  Association  "as  information",  and  (2)  the  formulation  of 
recommended  practices  to  be  submitted  for  adoption  and  publication  in  the  Manual. 

(a)  Whether  the  report  on  any  particular  assignment  should  take  the  form  of 
"information"  or  a  "recommended  practice",  depends  largely  on  the  nature  of  the  assign- 
ment. Some  assignments  will  be  fulfilled  completely  by  the  presentation  of  information; 
others  call  for  information  in  support  of  appended  recommendations  that  are  submitted 
for  adoption.  In  still  other  cases,  the  primary  objective  is  a  comprehensive  statement  of 
recommended  practices,  but  the  development  of  these  recommended  practices  may  entail 
investigation  or  research  work,  the  results  of  which  are  of  such  importance  as  to  war- 
rant their  presentation  as  information  prior  to  the  submission  of  the  recommendations. 
In  some  cases,  also,  it  may  be  advisable  to  submit  as  information  matter  in  the  form  of 
recommended  practice,  with  a  view  to  inviting  suggestions  and  criticisms  that  may  serve 
as  the  basis  for  revisions  prior  to  the  resubmission  of  the  matter  for  adoption  a  year  later. 

Planning  the  Work 

6.  In  pursuing  the  work  on  any  assignment,  the  first  step  is  necessarily  one  of  fact 
finding,  including  (a)  a  study  of  available  literature  on  the  subject,  particularly  reports 
of  previous  investigations,  (b)  a  compilation  of  current  practice,  especially  recent  changes 
in  practice,  and  (c)  resort  to  original  tests  or  experimentation,  after  a  canvass  of  all 
other  sources  of  information  indicates  that  research  work  is  necessary. 

Collection  of  Data 

(a)  Committees  are  privileged  to  obtain  data  or  information  in  any  proper  way. 
If  desired,  the  secretary  will  issue  circulars  of  inquiry,  which  should  be  brief  and  concise. 
The  questions  asked  should  be  specific  and  pertinent,  and  not  of  such  general  or  involved 
character  as  to  preclude  the  possibiUty  of  obtaining  satisfactory  and  prompt  responses. 
They  should  specify  to  whom  answers  are  to  be  sent,  and  should  be  in  such  form  that 
copies  can  be  retained  by  persons  replying  either  by  typewriter  or  blueprint. 

(b)  Requests  for  appropriations  for  the  conduct  of  research  work  should  be  sent 
to  the  secretary  with  a  supporting  statement  setting  forth:  (a)  the  nature  of  the  infor- 
mation sought;  (b)  how  the  railroads  are  adversely  affected  by  the  lack  of  this  informa- 
tion; (c)  the  estimated  cost  of  the  investigation;  (d)  the  estimated  time  to  complete  the 
work;  (e)  the  basis  for  assuming  that  the  investigation  will  produce  the  data  desired; 
and,  (f)  an  estimate  of  the  savings  to  be  realized  or  other  advantages  to  accrue  from  the 
successful  completion  of  the  investigations.  A  request  for  funds  to  continue  or  complete 
an  investigation  shall  include  a  statement  of  the  results  obtained  to  date. 

Reports 

7.  Committees  should  pursue  their  investigations  on  all  assignments  but  are  expected 
to  present  progress  or  final  reports  for  publication  only  on  those  assignments  regarding 
which  pertinent  information  has  been  developed. 

(a)  Committees  are  privileged  to  present  the  results  of  any  special  study  or  investi- 
gation they  may  be  engaged  upon  in  connection  with  their  assignments  that  may  be 
considered  of  sufficient  importance  to  warrant  presentation. 

(b)  Reports  of  information,  supplementing  previous  reports  of  progress,  may  include 
a  brief  review  of  matter  previously  presented,  but  should  avoid  extended  repetition  of 
such  matter. 


21  General    Information 

(c)  Matter  offered  for  adoption  and  publication  in  the  Manual  should  be  submitted 
in  full,  regardless  of  its  publication  in  previous  years  unless  the  matter  being  offered 
appeared  in  identical  form  not  more  than  one  year  before  being  submitted  for  adoption. 

(d)  Illustrations  accompanying  reports  should,  when  possible,  be  prepared  so  that 
they  can  be  reproduced  on  one  page.  The  use  of  inserts  should  be  avoided. 

(e)  One  of  the  most  important  duties  of  each  committee  is  to  examine  its  own 
subject-matter  in  the  Manual  each  year  and  submit  such  revisions  of  or  supplements  to 
the  Manual  as  are  deemed  necessary  to  keep  it  up  to  date.  New  matter  for  publication 
in  the  Manual  and  revisions  thereof  must  be  submitted  in  the  form  and  manner  specified 
in  the  General  Rules  for  Publication  of  the  Manual. 

Form  of  Reports 

8.  Committee  reports  shall  be  prepared  in  accordance  with  the  Instructions  published 
in  the  annual  pamphlet  of  committee  assignments  and  personnel. 

(C)  Publication  of  Reports 

Dates  for  Filing  and  Publication  of  Reports 

9.  For  the  convenience  of  those  attending  the  convention,  the  reports  of  committees 
to  be  presented  at  any  session  of  the  annual  convention  will  be  published,  so  far  as  pos- 
sible, in  the  same  bulletin.  To  carry  out  this  plan  requires  a  careful  scheduling  of  the 
filing  of  reports  and  the  publication  of  bulletins,  and  the  arrangement  of  the  convention 
program.  It  is  of  utmost  importance  that  chairmen  file  complete  reports  of  their  com- 
mittees on  or  before  the  dates  specified  on  the  schedule  furnished  them. 

Written  Discussions 

10.  Written  discussions  of  published  reports  will  be  transmitted  to  the  chairman  of 
the  interested  committee  who  will  read  or  present  them  by  title  or  in  abstract  at  the 
convention.  Written  discussions  will  be  published  in  the  Proceedings  as  a  part  of  the 
discussion  of  the  committee  reports. 

Verbal  Discussions 

11.  Each  speaker's  remarks  will  be  submitted  to  him  in  writing  before  publication 
in  the  Proceedings,  for  the  correction  of  diction  and  errors  of  reporting,  but  not  for  the 
elimination  of  remarks. 

Seauence  ^^^  Consideration  of  Committee  Reports 

12.  The  sequence  in  which  committee  reports  will  be  considered  by  the  convention 
will  be  determined  by  the  Board  of  Direction. 

Method 

13.  Reports  offered  as  information  will  be  presented  by  title  or  by  a  brief  outline  of 
the  contents.  Comments  or  criticisms  may  be  offered  from  the  floor  upon  invitation  from 
the  presiding  officer. 

14.  Matter  submitted  for  adoption  and  publication  in  the  Manual  may  receive 
consideration  by  one  of  the  following  procedures: 

(a)  Reading  by  title. 

(b)  Reading,  discussing  and  acting  upon  each  conclusion  separately. 

(c)  By  majority  vote,  discussion  will  be  had  on  each  item.  Clauses  not  objected  to 

when  read  will  be  considered  as  voted  upon  and  adopted. 


General    Information  23 

Action  on  Reports 

IS.  No  formal  action  is  to  be  taken  by  the  convention  on  matter  submitted  as 
information,  whether  in  the  form  of  a  progress  or  final  report. 

Action  on  matter  submitted  for  adoption  and  publication  in  the  Manual  will  be 
one  of  the  following: 

(a)  Adoption  as  a  whole  as  presented. 

(b)  Affirmative  action  on  the  amendment  of  a  part  or  parts  of  the  matter  presented, 

followed  by  adoption  as  a  whole,  as  amended. 

(c)  Adoption  of  a  part,  complete  in  itself,  and  referring  of  remainder  back  to  the 

committee. 

(d)  Recommittal  with  or  without  instructions. 

Note. — An  amendment  which  affects  underlying  principles,  if  adopted,  shall  of  itself 
constitute  a  recommittal  of  such  part  of  the  report  as  the  committee  considers  affected. 

The  Chair  will  decline  to  entertain  amendments  which  in  his  opinion  are  primarily 
a  matter  of  editing. 

(E)  Publication  of  Abstracts  by  Technical  Journals 

The  following  rules  will  govern  the  releasing  of  matter  for  publication  in  technical 
journals: 

Committee  reports,  requiring  action  by  the  Association  at  the  annual  convention, 
will  not  be  released  until  after  presentation  to  the  convention ;  special  articles,  contributed 
by  members  and  others,  on  which  no  action  by  the  Association  is  necessary,  are  to  be 
released  for  publication  by  the  technical  journals  after  issuance  in  the  bulletin;  provided, 
application  therefor  is  made  in  writing  and  proper  credit  be  given  the  Association, 
authors  or  committees  presenting  such  material. 


GENERAL  RULES  FOR  PUBLICATION  OF  THE  MANUAL 
Title 

1.  The  title  of  the  volume  will  be  "Manual  of  the  American  Railway  Engineering 
Association." 

2.  The  Board  of  Direction  shall  have  the  authority  to  withhold  from  publication 
any  matter  which  it  shall  consider  as  not  desirable  to  publish,  or  as  not  being  in  proper 
shape,  or  as  not  having  received  proper  study  and  consideration. 

Contents 

3.  The  matter  adopted  by  the  Association  for  publication  in  the  Manual  shall  be 
considered  Recommended  Practice,  but  shall  not  be  binding  on  the  members.  Recom- 
mended Practice,  as  defined  by  the  Board  of  Direction  (May  20,  1936)  is  a  material, 
device,  plan,  specification  or  practice  recommended  to  the  railways  for  use  as  required, 
either  exactly  as  presented  or  with  such  modifications  as  may  be  necessary  or  desirable 
to  meet  the  needs  of  individual  railways,  but  in  either  event,  with  a  view  to  promoting 
efficiency  or  economy,  or  both,  in  the  location,  construction,  operation  or  maintenance 
of  railways. 

Requisites  for  Adoption 

4.  The  Manual  will  include  only  such  matter  as  has  been  made  the  subject  of  a 
special  study  by  a  standing  or  special  committee  and  embodied  in  a  committee  report, 
pubUshed  not  less  than  thirty  days  prior  to  the  Annual  Convention,  and  submitted  by 
the  committee  to  the  Annual  Convention,  and  which,  after  due  consideration  and  dis- 


24 General    Information 

cussion,  shall  have  been  voted  on  and  formally  adopted  by  the  Association.  Subjects 
which,  in  the  opinion  of  the  Board  of  Direction  shall  be  reviewed  by  the  Association 
of  American  Railroads,  may  be  referred  to  that  association  before  being  published  in 
the  Manual. 

5.  All  conclusions  included  in  the  Manual  must  be  in  concise  and  proper  shape  for 
publication,  as  the  Manual  will  consist  only  of  a  summary  record  of  the  definitions, 
specifications  and  principles  of  practice  adopted  by  the  Association,  with  a  brief  reference 
to  the  published  Proceedings  of  the  Association  for  the  context  of  the  committee  report 
and  subsequent  discussion  and  the  final  action  of  the  Association. 

Revision 

6.  Any  matter  published  in  the  Manual  may  be  amended  or  withdrawn  by  vote 
at  any  subsequent  Annual  Convention,  provided  such  changes  are  proposed  in  time  for 
publication  not  less  than  thirty  days  prior  to  the  Annual  Convention,  and  in  the  fol- 
lowing manner:  (a)  upon  recommendation  of  the  committee  in  charge  of  the  subject; 
(b)  upon  recommendation  of  the  Board  of  Direction;  (c)  upon  request  of  five  members, 
made  to  the  Board  of  Direction. 

7.  Revisions  of  or  additions  to  the  Manual  authorized  by  action  at  each  convention 
will  be  published  annually  in  the  form  of  loose-leaf  sheets  which  will  be  made  available 
to  all  holders  of  the  Manual.  These  supplemental  sheets  will  be  accompanied  by  instruc- 
tions for  insertion  of  the  new  sheets  and  the  withdrawal  of  sheets  that  have  been  super- 
seded, as  well  as  those  that  have  been  withdrawn  by  action  of  the  Association. 


Report  of  Committee  26 — Standardization 


F,  L.  Nicholson, 

Chairman, 
J.  E.  Armstrong 
F.  L.  C.  Bond 
A.  E.  BOTTS 
John  Foley 
W.  H.  Penpeeld 
W.  G.  Arn 
L.  H.  Lapfoley 
H.  M.  Church 


J.  F.  Leonard 
J.  G.  Brennan 
H.  G.  Morgan 
C.  A.  Knowles 
W.  T.  Dorrance 

B.  W.  DeGeer 

C.  H.  Mottier 
R.  A.  Van  Ness 
H.  M.  Stout 
H.  R.  Duncan* 


H.  F.  Brown 
W.  G.  Nusz 
G.  M.  O'Rourke 
G.  P.  Palmer 
G.  R.  Westcott 
Dr.  a.  N.  Talbot 
A.  R.  Wllson 
J.  A.  Lahmer 
J.  B.  Hunley 

Committee 


*  Appointed  to  succeed  C.  F.  Ford,  chairman  of  Committee  17 — Wood  Preservation,  who  died  on 
June  9,  1940. 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  assignments: 

1.  What  AREA  recommended  practices  should  be  advocated  for  general  use  on 
railways  ? 

Your  committee  submitted  to  the  membership  at  the  1940  convention  a  tabulation 
of  recommended  practices  and  urged  their  adoption  insofar  as  possible  by  the  railroads 
represented  in  the  Association.  Such  use,  it  is  believed,  will  result  in  economies  in  con- 
struction and  maintenance  and  most  satisfactory  performance. 

The  committee  makes  no  additional  recommendations  at  this  time. 

2.  What  AREA  recommended  practices  should  be  sponsored  as  subjects  for  national 
standardization  ? 

The  recommended  practices  as  adopted  and  printed  in  the  Manual  are  largely  for 
the  benefit  of  the  railroad  industry,  and  with  possibly  few  exceptions  are  not  subjects  to 
be  sponsored  for  national  standardization  through  the  American  Standards  Association 
or  like  organizations. 

The  committee  has  no  recommendations  to  make  at  this  time. 

3.  Maintain  contact  with  standardization  bodies  and  keep  the  Association  informed 
on  important  matters  developed  by  such  contact. 

The  interests  of  this  Association  are  cared  for  by  duly  appointed  representatives  to 
these  national  organizations.  The  committee  furnished  to  the  members  in  its  report  at 
the  1940  convention,  a  hst  of  members  representing  this  Association  on  the  committees 
of  the  American  Standards  Association  and  on  the  committees  of  the  American  Society 
for  Testing  Materials. 

The  changes  during  the  year  in  representation  on  committees  of  the  American 
Standards  Association  are  as  follows: 


.45^4  Projects: 

Bl  — Screw  Threads,  Standardization  and  Unification  of, 
Committee  4— Rail  (C.  &  M.  Section)! 

C.  B.  Bronson  appointed  representative  to  replace  J.  V.  Neubert,  deceased 


t  As  this  representation  is  sponsored  by  the  AAR,   the  AREA  committees  are  designated  as  repre- 
senting the  Construction  and  Maintenance  Section. 
Bulletin  420,  November,  1940. 

25 


26  Standardization 


B18 — Bolt,  Nut  and  Rivet  Proportions 

Committee  4— Rail  (C.  &  M.  Section) 

C.  B.  Bronson  appointed  representative  to  replace  J.  V.  Neubert,  deceased; 

R.  T.  Scholes  appointed  alternate  to  succeed  J.  B.  Myers 
Committee  IS — Iron  and  Steel  Structures  (C.  &  M.  Section) 

O.  E.  Selby  appointed  to  replace  P.  G.  Lang,  Jr.,  deceased 

The  representation  of  the  AAR  on  Standards  Council  of  the  American  Standards 
Association  has  been  changed  as  follows: 

Principals 

A.  R.  Wilson  (Engineering  Division),  term  extended  to  December  31,  1942 

Alternates 

A.  L.  Sorensen  (Purchases  and  Stores  Division)  replaces  C.  B.  Tobey 
J.   D.  Rogers   (Operating- — Transportation  Division)    appointed 

The  Canadian  Engineering  Standards  Association,  through  Mr.  W.  R.  McCaffrey, 
its  secretary,  reports  the  pubhcation  during  the  year  of  new  standards  or  revisions  of 
existing  standards,  as  follows: 

AS  —1940— Portland  Cement   (3rd  Edition) 

AS7— 1940— High  Early  Strength  Portland  Cement  (included  in  AS— 1940) 

B12— 1939— Galvanized  Steel  Wire  Strand  (2nd  Edition) 

B53 — 1939 — Code  for  Identification  of  Piping  Systems 

C14— 1939— Reinforced  Concrete  Poles  (2nd  Edition) 

The  following  standards  have  been  the  subject  of  discussion  by  appropriate  com- 
mittees during  the  past  year  and  such  progress  has  been  made  that  it  is  anticipated 
revised  standards  will  be  published  during  the  year,  as  follows: 

Al  — 1928 — Steel  Railway  Bridges   (Revision) 

A16 — 1930 — Steel  Structures  for  Buildings   (Revision) 
(New  edition  will  be  S16— 1940) 

A23 — 1929 — Concrete  and  Reinforced  Concrete  (Revision) 

SS9  —Metallic  Arc  Welding  (Bridges  and  Buildings) 

The  American  Society  for  Testing  Materials,  through  Mr.  C.  L.  Warwick,  secretary, 
reports  the  following  changes: 

Committee  AS  on  Iron  and  Steel 

AREA  Committee  13 — ^Water  Service,  Fire  Protection  and  Sanitation 

Ray  McBrian  appointed  to  replace  J.  J.  Laudig  as  representative;  W.  L. 
Curtiss  appointed  alternate 
Committee  C9  on  Concrete  and  Concrete  Aggregates 
AREA  Committee  8 — Masonry 

C.  P.  Marsh  appointed  representative  to  succeed  W.  K.  Hatt 
Committee  D7  on  Timber 

AREA  Committee  17 — Wood  Preservation 

Add  Dr.  Hermann  von   Schrenk,   to   correct   error   of   omission   in  last 
report  to  the  Association 
Committee  C4  on  Clay  Pipe 

AREA  Committee  1 — Roadway  and  Ballast 
Add  W.  C.  Swartout,  appointed 


Standardization  27 


The  report  of  Committee  Al  on  Steel  presented  at  the  1940  annual  meeting  included 
five  new  tentative  specifications — one  on  factory-made  wrought  carbon-steel  and  carbon- 
molybdenum-steel  welding  fittings,  and  four  covering  carbon  and  alloy-steel  forgings. 
respectively,  for  general  industrial  and  railroad  use.  An  addition  was  made  in  the  carbon- 
steel  specifications  for  general  industrial  use  providing  a  grade  for  use  in  bridges  with  a 
minimum  tensile  strength  of  66,000  lb.  per  sq.  in.,  and  a  yield  point  of  33,000  lb.  per 
sq.  in. 

Committee  Cl  on  Cement  recommended  new  specifications  for  Portland  cement 
comprising  five  types.  These  include  one  for  use  in  general  construction,  another  for  high 
early  strength,  one  for  use  when  a  low  heat  of  hydration  is  required,  one  for  use  when 
high  sulfate  resistance  is  required,  and  one  for  use  when  special  properties  of  the  three 
latter  types  are  not  required.  It  is  expected  that  the  new  tentative  standard  will  replace 
the  present  Standard  Specifications  for  Portland  Cement  (C9 — 38)  and  for  High  Early 
Strength  Portland  Cement  {C7A — 39). 

This  report  is  submitted  as  information. 

The  Committee  on  Standardization, 

F.  L.  Nicholson,  Chairman. 


Report  of  Committee  18 — Electricity 

H.  F.  Brown,  Chairman,  W.  L.  Morse  D.  B.  Thompson,  Vice- 

D.  J.  Brumley  R.  J.  Needham  Chairman, 

D.  M.  BuRCKETT  S.  R.  Negley  W.  M.  Vandersluis 

F.  W.  Gardiner  A.  E.  Owen  R.  P.  Winton 

Paul  Lebenbaum  H.  W.  Pinkerton  Committee 

To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Developments  in  the  application  of  electricity  to  railway  service. 
Progress  report,  presented  as  information  below. 

2.  The  principal  current  activities  of  the  Electrical  Section,  Engineering  Division, 
AAR,  by  synopsis,  supplemented  with  list  and  reference  by  number  of  adopted  specifi- 
cations, designs  and  principles  of  practice. 

Progress  report,  presented  as  information   page  29. 

The  Committee  on  Electricity, 

D.  B.  Thompson,  Vice-Chair  man. 


Report  on  Assignment  1 
Developments  in  the  Application  of  Electricity  to  Railway  Service 

During  the  past  year  there  have  been  very  few  new  developments.  There  has,  how- 
ever, been  a  widening  of  the  usefulness  of  previous  development,  thereby  providing  the 
railroads  with  several  more  ways  in  which  electricity  can  be  made  to  serve  them. 

For  electrified  roads  using  direct  current,  the  ignition  rectifier  is  proving  an  efficient 
and  desirable  conversion  unit. 

The  recently  developed  air-blast  circuit  breaker  and  other  makes  of  breakers  in 
which  the  arc  is  interrupted  in  air  (thus  obviating  the  use  of  any  insulating  oil)  should 
be  of  interest  on  railroads  where  heavy  alternating  currents  must  be  handled. 

Plate  type  rectifiers  for  quiet  and  efficient  battery  charging  are  being  favorably 
received.  They  are  available  in  portable  and  stationary  types  for  charging  batteries  on 
shop  and  baggage  trucks,  and  on  passenger  cars.  In  addition,  small  units  have  been 
developed  for  mounting  underneath  passenger  cars. 

The  a.c.  transformer  type  welder  is  finding  broad  fields  of  usefulness  in  railroad 
shops  for  many  classes  of  work. 

Lowered  cost  of  lamps  and  accessories,  plus  lengthened  lamp  life,  has  increased  the 
advantages  of  fluorescent  and  high  intensity  mercury  vapor  lighting.  Improved  illumi- 
nation with  lower  power  consumption  makes  it  well  suited  for  use  in  offices,  stations, 
shops  and  passenger  cars.  Lamps  for  64-volt  d.c.  operation  are  now  available,  and 
improved  inverters  are  furthering  the  use  of  110- volt  a.c.  units  on  passenger  cars. 

For  greater  passenger  comfort,  electrically  refrigerated  drinking  water  coolers  are 
now  available  in  several  different  types  for  installation  on  passenger  cars. 


Bulletin  420,  November,  1940. 

28 


Electricity 29 

Floodlighting,  which  has  long  been  used  in  railroad  yards,  is  now  being  applied  to 
highway  grade  crossings  in  an  effort  to  further  reduce  accidents. 

The  severe  weather  that  was  experienced  in  many  localities  last  winter  has  shown 
the  need  for  a  more  extensive  use  of  tubular  type  track  switch  heaters.  They  have  been 
remarkably  successful  in  keeping  important  interlockings  free  from  trouble  due  to  frozen 
switch  points. 

In  the  field  of  switching  engines,  the  Diesel-electric  switching  locomotive  has  demon- 
strated its  merits  from  the  standpoint  of  both  economy  and  availability. 

Where  fine  dust  or  pollen  is  objectionable,  the  electrostatic  air  cleaner  is  efficient  and 
may  prove  a  desirable  adjunct  to  air  conditioning  systems  in  offices  and  restaurants. 

The  use  of  rubber  either  in  the  form  of  molded  material  or  rubber  coating  of  metal, 
is  being  promoted  in  connection  with  the  insulation  of  third  rails  and  running  rails  for 
the  purpose  of  preventing  electrolytic  action  as  well  as  to  provide  voltage  protection. 
There  seems  to  be  a  considerable  field  and  a  demand  for  this  form  of  rubber  insulation 
and  future  studies  and  developments  will  result  in  a  more  general  use. 


Report  on  Assignment  2 

The  Principal  Current  Activities  of  the  Electrical  Section, 
Engineering  Division 

The  reports  of  the  committees  of  the  Electrical  Section,  Engineering  Division,  have 
been  published  in  Bulletin  419,  September-October,  1940,  and  are  therefore  merely 
summarized  here. 

Power  Supply. — In  general,  the  assignments  to  this  committee  cover  the  relative 
economy  and  advantages  of  Diesel-electric  power  and  purchased  power;  electrical  power 
supply  design  for  air  conditioning  and  battery  charging  service;  consolidation  of  meter- 
ing, and  form  of  contract  for  the  purchase  of  electrical  energy  for  other  than  traction 
purposes,  as  well  as  to  study  the  feasibility  of  a  standard  electric  power  supply  for 
electric  traction. 

Electrolysis. — The  purpose  of  this  committee  is  to  report  on  the  various  practices 
of  electrified  railroads  in  preventing  leakage  of  stray  currents  through  the  foundations 
and  guys  of  catenary  supported  structures;  to  report  on  the  electrolytic  corrosion  of 
insulation  hardware;  to  study  the  methods  used  on  various  railroads  and  other  utihties 
for  handling  their  electrolysis  problems  in  regard  to  organization,  period  of  surveys  and 
equipment  used;  to  report  on  the  methods  of  protection  applied  to  foreign  cables  and 
other  similar  structures  where  they  enter  the  railroad  right-of-way. 

Electric  Heating  and  Welding. — The  committee  report  covers  the  use  of  thermal 
pliers  for  producing  low-voltage  high-amperage  current  from  standard  a.c.  distribution 
circuits.  They  find  their  principal  use  in  localized  heating,  such  as  sweating  terminal  lugs 
and  copper  tubing  joints.  The  committee  also  reports  on  the  comparative  advantages  and 
disadvantages  of  a.c.  60-cycle  and  180-cycle,  and  d.c.  rectifiers,  motor  generators  and 
other  equipment  and  methods  of  control  used  in  welding.  There  is  also  a  report  on 
recent  developments  in  snow  melting  equipment  and  its  installation,  as  well  as  a  report 
on  the  prevention  of  the  formation  of  sleet  on  transmission  wires. 

Application  of  Motors. — This  is  a  report  of  a  joint  committee  comprised  of  repre- 
sentatives of  the  Electrical  sections  of  the  Mechanical  and  Engineering  divisions.  It 
covers  the  inspection  and  maintenance  of  motors,  as  well  as  repair  shop  practice ;  a  report 


30 Electricity 

on  alternating-current  commercial  electric  motor  characteristics;  motor  control  for 
various  types  of  equipment  and  the  design  of  motor  supply  circuits. 

Clearances  for  Third-Rail  and  Overhead  Working  Conductors. — This  committee  has 
prepared  a  clearance  diagram,  entitled  Clearance  Lines  for  Pantograph,  Catenary  Con- 
struction and  Adjacent  Permanent  Way  Structures.  The  diagram  presented  last  year  as 
information  was  presented  in  revised  form  at  the  annual  meeting  of  the  Electrical 
Section  on  October  29,  1940,  and,  in  accordance  with  action  taken,  will  be  submitted  to 
the  Member  Roads  for  letter  ballot  approval. 

Track  and  Third-Rail  Bonds. — This  is  a  progress  report  presented  as  information 
only,  and  includes  a  study  of  detail  bond  design  with  the  view  of  developing  specij&ca- 
tions  for  welded  bonds;  information  concerning  rail  joint  clearance  and  its  effect  on  rail 
bond  design,  including  experience  with  various  types  of  bonds;  and  a  report  on  various 
methods  of  welding,  using  gas  or  electricity,  or  by  brazing,  types  of  electrodes  and  their 
chemical  composition,  best  suited  to  each  method. 

Illumination. — The  committee  report  touches  on  fluorescent  lighting  for  offices, 
drafting  rooms,  etc.,  and  also  on  the  availability  and  types  of  drying  lamps  which  were 
discussed  last  year  under  the  caption  "Heating  Lamps". 

High  Tension  Cables. — The  report  contains  information  concerning  the  selection, 
handUng  and  maintenance  of  high  tension  cables. 

Application  of  Corrosion-Resisting  Materials  to  Railroad  Electrical  Construction. — 
The  report  of  this  committee  covers  a  continuation  of  the  study  of  corrosion-resisting 
materials  as  installed  at  Lambert  Point  on  the  Norfolk  &  Western  Railway,  with  a  view 
of  obtaining  qualitative  and  quantitative  data  on  the  service  life  of  various  metals. 

In  conclusion,  attention  is  directed  to  the  interest  shown  by  the  various  committees 
in  the  effort  being  made  to  avoid  duplication  in  the  work  of  different  sections  of  the 
AAR  concerned  with  the  use  of  electricity.  The  committees  have  collaborated  with 
various  committees  of  other  sections  for  the  purpose  of  avoiding  such  duplication  as 
well  as  obtaining  valuable  suggestions  from  other  sections  interested  in  the  same  subject. 


Report  of  Committee  10 — Signals  and  Interlocking 


H.  G.  Morgan,  Chairvian, 

F.  H.  Bagley 

G.  H.  Dryden 
W.  J.  EcK 

W.  H.  Elliott 
P.  M.  Gault 
W.  N.  Hartman 


C.   R.   HODGDON 

J.  C.  Mock 
R.  D.  Moore 
F.  W.  Pfleging 
W.  M.  Post 
A.  H.  RuDD 
J.  E.  Saunders 


H.  H.  Orr,  Vice-Chairman, 
H.  L.  Stanton 

E.  G.  Stradling 
G.  K.  Thomas 
C.  H.  Tillett 

W.  M.  Vandersluis 

F.  B.  Wiegand 

Committee 


To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Developments  in  railway  signaling. 

No  report;  no  developments  worthy  of  mention  have  taken  place  since  the  annual 
meeting  in  1940. 

2.  The  principal  current  activities  of  the  Signal  Section,  AAR,  by  synopsis,  supple- 
mented with  list  and  reference,  by  number,  of  adopted  specifications,  designs  and 
principles  of  practice. 

Progress  report — presented  as  information. 

The  Committee  on  Signals  and  Interlocking, 

H.  G.  Morgan,  Chairman. 


Report  on  Assignment  2 

The  Principal  Current  Activities  of  the  Signal  Section, 
AAR,  by  Synopsis 

Supplemented  With  List  and  References  by  Number  of  Adopted 
Specifications,  Designs  and  Principles  of  Signaling  Practice 

W.  M.  Post  (chairman,  subcommittee),  G.  H.  Dryden,  W.  J.  Eck,  J.  C.  Mock,  W.  N. 
Hartman,  C.  H.  Tillett. 

Current  Activities  of  the  Signal  Section,  AAR,  Since  November  1939 

There  are  now  available  23  of  a  series  of  24  pamphlets  on  American  Railway  Signal- 
ing Principles  and  Practices,  prepared  for  the  education  of  signal  men  and  others  desir- 
ing to  study  this  subject. 

The  work  performed  during  the  fiscal  year  of  1939  and  reported  at  the  1940  Annual 
Meeting  covers  the  following  subjects: 

1.  Costs  involved  in  stopping  trains — progress  report. 

2.  Costs  (other  than  fuel  and  water)  involved  in  stopping  trains. 

3.  Additions  and  revisions  to  Chapter  III — Principles  and  Economic  Phase  of 
Signahng. 

4.  Economy  in  signaling  construction  and  maintenance  costs  by  using  78-ft.  rails 
instead  of  39-ft.  rails. 


Bulletin  420,  November,   1940. 


31 


32  Signals   and    Interlocking 


5.  Economy  of  slide  detector  fences. 

6.  Train  operation  by  signal  indication. 

7.  Economic  value  of  car  retarders — progress  report. 

8.  Economic  value  of  electrically  lighted  lamps. 

9.  Mechanical  facing  point  locks  for  spring  switches — ^progress  report. 

10.  Protection  of  traffic  against  slides  and  rock  falls. 

11.  Switch,  frog  and  crossing  layout  plans — collaborating  with  AREA  Committee  S. 

12.  Summary  of  automatic  train  control  and  automatic  cab  signals  in  the  United 
States  as  of  January  1,  1940. 

13.  Applications  to  the  Interstate  Commerce  Commission  for  modification  of  signals, 
etc. 

14.  Hearings  before  the  Interstate  Commerce  Commission. 

15.  Activities  of  radio  communication  for  railroad  purposes — cooperative  report. 

16.  Interstate  Commerce  Commission  rules,  standards  and  instructions  for  installa- 
tion, inspection,  maintenance  and  repair  of  automatic  block  signal  systems,  interlocking, 
centralized  traffic  control  systems,  automatic  cab  signal  systems  continuously  controlled, 
dragging  equipment  and  slide  detectors  and  other  similar  protective  devices;  other  simi- 
lar appliances,  methods,  and  systems. 

17.  Devices  and  methods  to  control  automatic  signals  or  special  signals  for  the 
protection  of  traffic  against  high  water  at  vulnerable  points  and  fires  at  bridges  and 
trestles. 

18.  PossibiUty  of  hazard  or  false  operation  resulting  from  the  use  of  rail  fissure 
detector  cars  and  recommended  protective  measures. 

19.  Protection  against  lightning — progress  report. 

20.  Development  of  proposed  inductive  coordination  measures  involving  railroad 
power  lines  and  power  equipment — progress  report. 

21.  Tables  showing  capacity  available  in  various  types  of  storage  and  primary 
batteries  at  solution  temperatures  ranging  from  zero  degree  to  100  deg.  F. 

22.  Electric  insulating  materials  in  general — cooperative  report. 

23.  General  classification  for  signal  interruptions. 

24.  Illumination  of  crossings. 

25.  Corrective  measures  to  minimize  or  eliminate  phantom  indications  of  flashing 
light  signals. 

26.  Modifications  of  the  National  Electrical  Safety  Code  to  avoid  confliction  with 
recognized  signal  practice. 

27.  Noteworthy  changes  in  signal  practices. 

Revised  Specifications  Submitted  to  Letter  Ballot 

Old  No.        New  No. 

Channel  Pins    23-39              23-40 

Installation    of    Made    Ground    for    Protection    Against    Abnormal 

Potentials     60-39              60-40 

Electric-Pneumatic    Interlocking    6733              67-40 

Signal  Glasses   (exclusive  of  kerosene  hand  lantern  globes) 69-39              69-40 

Multiple-Conductor     Rubber-Insulated     Cable     with     Weather- 
Resistant  or  Flame-Retarding  Braid  Covering   89-39              89-40 

Multiple-Conductor,    Rubber-Insulated,    Submarine    Cable,    Lead 

Sheathed  and  Round  Steel  Armored   90-39              90-40 

Single  and  Multiple-Conductor,  Rubber-Insulated  Lead  Sheathed 

Cable    91_39              9i_40 


Signal s   and   Interlocking 


33 


Old  No. 

Zero-Degree  Fahrenheit  Lubricating  Oil,  Summer  Grade   102-39 

Forty-Five     Degrees    Below     Zero     Fahrenheit     Lubricating     Oil, 

Winter    Grade    103-39 

Single-Conductor,  Rubber-Insulated  Wire  and  Cable  with  Flame- 
Retarding,  Moisture-Resistant  Braid  Covering  or  Weather- 
Resistant  Braid  Covering    11 1-39 

Paint  and  Painting   120-39 

Circuit  Controller  for  Drawbridges   130-39 

Track  Circuit  Rail  Bonding    135-39 

Single   and   Multiple-Conductor,    Rubber-Insulated,    Lead-Covered 

Parkway  Cable  Armored  with  Flat  Steel  or  Zinc  Tape  145-39 

Car  Retarder  System  147-35 

Electro-Pneumatic  Switch  Operating  Mechanism   152-39 

Railroad  Highway  Grade  Crossing  Signs  155-39 

Reflector  Unit   156-39 

Single    and    Multiple-Conductor,    Rubber-Insulated,    Non-MetalUc 

Sheath  Cable    161-39 

Tractive  Armature  Direct-Current  Polarized  Relay   165-39 

Copper-Covered  Steel  Line  Wire  with  or  without  Weather- 
Resistant  Covering   167-39 

Copper    Alloy    Line    Wire    with    or    without    Weather-Resistant 

Covering    168-39 

Hard-Drawn  Copper  Line  Wire  with  or  without  Weather-Resistant 

Covering    169-39 

Interlocking  at  Drawbridges  for  the  Protection  of  Train  Movements  175-38 
Weather-Resistant  Braid  Covering  for  Insulated  Wire  and  Cable  182-39 

Enameled  Round  Copper  Magnet  Wire   193-40 

Copper-Bearing  Steel  Line  Wire  with  or  without  Weather-Resistant 

Covering    196-40 

*  (Old  title  Specification  for  Galvanized  Copper  Bearing  Steel  Line  Wire.) 

Revised  Drawings  Submitted  to  Letter  Ballot 

Pipe  Adjusting  Screws  (details  and  assembly)    1002 

Forged  Cranks   (details)    1007 

Screw  and  Solid  Jaws  (details)    1016B 

Jaws — Tang  End  and  Adjustable  Link  (details  and  assembly) 1019B 

Multiple  Unit  Terminal  Block    1054A 

Ball  Studs  (details  and  assemblies)    12S4A 

Ball  Socket  Screw  Jaw   12S4A 

Switch  Circuit  Controller  Lug    125SC 

Switch  Circuit  Controller  Rods   12S6A 

Plunger  Switch  Lock — Rectangular  Plunger   142SC 

Plunger  Switch  Lock-Details — Rectangular   Plunger    1426C 

Highway  Crossing  Gate  and  Slow  Track  Sign  Lamp  Hangers 1496 

Method  of  Applying  Compensation    1536 

Highway  Crossing  Signal  Assembly — Wig- Wag  Type   1651B 

Highway  Crossing  Signal  Assembly — Wig- Wag  Type   1652B 

Highway   Crossing  Signal  Assembly — Flashing   Light  Type 1653B 


New  No. 
102-40 

103-40 


111-40 
120-40 
130-40 
135-^0 

145-40 
147^0 
152-40 
155-40 
156-40 

161-40 
165-40 

167-40 

168-40 

169-40 
175-40 
182-40 


1002B 

1007B 

1016C 

1019  C 

10S4B 

1271A 

1272A 

12SSD 

1256B 

1425D 

1426  D 

1496B 

1536B 

1651C 

1652C 

1653C 


34 Signals   and   Interlocking ■ 

Old  No.  New  No. 

Highway    Crossing  Signal  Assembly — Flashing   Light  Type 1654B  1654C 

Highway  Crossing  Flashing  Light  Signal  Assembly — Cantilever  Type  1686 A  1686B 

Highway  Crossing  Sign— SO-Deg.   Reflector  Type   1691A  1691B 

Revised  Requisites  Submitted  to  Letter  Ballot 

Automatic  Block  SignaUng  Circuits 

Automatic  Block  Signaling  Systems  (Old  title  Requisites  for  Automatic  Block  Signal 
System) 

Centrahzed  Traffic  Control.  (Old  title  Requisites  for  CentraHzed  Traffic  Control  System) 

Highway  Grade  Crossing  Signals 

Interlocking  (Consolidation  of  old  Requisites  for  Interlocking  System,  and  Require- 
ments for  the  Protection  of  Traffic  at  Movable  Bridges) 

Mechanically  Locking  the  Levers  of  Interlocking  Machines 

Minimizing  the  Effect  of  Foreign  Current  on  Direct-Current  Track  Circuits 

Track  Welding  or  Heat  Treating  in  Track  Circuit  Territory 

Revised  Instructions  Submitted  to  Letter  Ballot 

Alternating-Current  Relays  (Old  title  Instructions  for  Inspecting,  Testing  and  Maintain- 
ing Alternating-Current  Relays) 

Alternating-Current  Track  Circuits  (Old  title  Instructions  for  Maintenance  and  Opera- 
tion of  Alternating-Current  Track  Circuits) 

Car  Retarder  Systems  (Old  title  Instructions  for  Maintaining  and  Testing  Car  Retarder 
Systems) 

Copper-Oxide  Caustic  Soda  Primary  Cells  (Old  title  Instructions  for  Installation  and 
Maintenance  of  Copper-Oxide  Caustic  Soda  Primary  Cells) 

Direct-Current  Track  Circuits  (Old  title  Instructions  for  Maintenance  and  Operation  of 
Direct- Current  Track  Circuits) 

Electric  Lamps  (Old  title  Instructions  for  Maintaining  and  Testing  Electric  Lamps) 

Insulated  Rail  Joints  (Old  title  Instructions  for  Inspecting,  Testing  and  Maintaining 
Insulated  Rail  Joints) 

Insulation  Resistance  (Old  title  Measurement  of  Insulation  Resistance) 

Interlocking  (Consohdation  of  old  Instructions  for  Maintaining  and  Testing  Interlocking 
Plants;  Signal  Maintenance;  and  Inspecting  and  Testing  Mechanical  Locking  of  an 
Interlocking  Machine) 

Light  and  Motor  Semaphore  Signals  (Consolidation  of  old  Instructions  for  Maintaining 
and  Testing  Motor  Semaphore  Signals,  and  Maintaining  and  Testing  Light  Signals) 

Rectifiers  and  Motor-Generators  (Old  title  Instructions  for  Maintaining  and  Operating 
Rectifiers) 

Resistance  of  Made  Grounds  (Old  title  A.R.A.  Sig.  Sec.  1377B — Methods  of  Measuring 
Ground  Resistance) 

Spring  Switches  (Old  title  Instructions  for  Maintaining,  Inspecting  and  Testing  Spring 
Switches) 

Storage  Batteries  (Consolidation  of  old  Instructions  for  Installation,  Maintenance  and 
Operation  of  Nickel,  Iron,  Alkaline  Storage  Batteries,  and  Installation,  Maintenance 
and  Operation  of  Lead  Acid  Type  Storage  Batteries) 

Switch  Circuit  Controllers  (Old  title  Instructions  for  Inspecting,  Testing  and  Maintain- 
ing Switch  Circuit  Controllers) 


Signals    and    Interlocking 3£ 

Tractive  Armature  Direct-Current  Relays  (Old  title  Instructions  for  Inspecting,  Testing 

and  Maintaining  Direct-Current  Relays) 
Wire  and  Cable  (Old  title  Instructions  for  Handling  Insulated  Wires  and  Cables) 

Revised  Miscellaneous  Matter  Submitted  to  Letter  Ballot 

Definition  for  Technical  Terms  Used  in  Signaling 

Form  of  Agreement  for  Interlocking  Plant 

Joint  Signal  Facilities — Construction  Cost  Detail 

Performance  Report — Automatic  Highway  Grade  Crossing  Protection — A.A.R.  Sig.  Sec. 

7054 
Stringing  Tensions  for  New  Suspension  Strand  with  Various  Sizes  of  Cables  (Old  title 

Recommended  Sags  for  Messenger  Wire) 

New  Specifications  Submitted  to  Letter  Ballot 

No. 

Air  Depolarized  Carbon  Caustic  Soda  Primary  Cell  172-40 

Fusible  Asphaltic  Base  Sealing  Compound  for  Protecting  Wire  Entrances,  Out- 
lets, Sleeves,  Potheads,  etc.,  Against  the  Entrance  of  Moisture 184-40 

Cold  Application  Compound  for  Closing  Wire  Entrances  and  Openings  188-40 

Tantalum   Rectifiers  and  Valves    189-40 

Flashing  Light  Signal  Lamp  Unit   190^40 

Flame-Retarding,    Moisture-Resistant    Braid    Covering    for    Insulated   Wire   and 

Cable    191-40 

Single-Conductor,    Asbestos    Varnished-Cambric    Insulated    Signal    Wire    with 

Flame-Retarding  Braid  Covering   192-40 

Cotton-Covered  Round  Copper  Magnet  Wire   194-40 

Silk-Covered  Round  Copper  Magnet  Wire   195-40 

Metal    Plating    

Various  Types  of  Steel   

New  Drawings  Submitted  to  Letter  Ballot 

Electric  Hand  Lantern  1346A 

Porcelain  Covers  (Air  Depolarized  Primary  Battery)    141 7A 

Base  for  Five-Inch  Mast    1447A 

Base  for  Five-Inch  Mast   1448A 

Crossing   Gate   Arm    1491A 

Electric  Hand  Lantern  Lens    1609A 

New  Requisites  Submitted  to  Letter  Ballot 
A.C.  and  D.C.  Coded  Signal  Systems 
Fence  for  the  Protection  of  Traffic  Against  Shdes  and  Rock  Falls 

New  Instructions  Submitted  to  Letter  Ballot 
Automatic  Block  Signaling  Systems 
Electric  Locks  for  Interlocking  Machines 

Specifications  Submitted  to  Letter  Ballot  for  Removal  from  the  Manual 

No. 

Galvanizing  for  Iron  or  Steel  

Weatherproof  Covering  for  Line  Wire  163-39 


36 Signals   and   Interlocking 

Drawings  Submitted  to  Letter  Ballot  for  Removal  from  the  Manual 

No. 

Method  of  Laying  Single  and  Sewer  Pipe  Duct  1331 

Duct  Reducers,  Mandrels,  Duct  Plugs  and  Dowel  Pins  1332 

Manhole  Frame  (Ten  Inches  High)  and  Cover   1333 

Cable  Hanger  Sockets,  Sewer  Steps  and  Manhole  Clevis  1334 

Vitrified  Clay  Duct    1335 

Method  of  Laying  Single  and  Multiple  Duct  1336 

Concrete   Manhole    1337 

Brick  Manhole    1338 

Manhole  Frame  (Four  Inches  High)  and  Cover 1339 

Adjustable  Resistance   (for  Testing)    1422A 

Requisites  Submitted  to  Letter  Ballot  for  Removal  from  the  Manual 

Protection  by  Signal  in  Emergencies 
Switch  Indicators 

Instructions  Submitted  to  Letter  Ballot  for  Removal  from  the  Manual 

Maintaining  and  Handling  Dry  Cells 
Installation  and  Operation  of  Switchboard 

Miscellaneous  Matter  Submitted  to  Letter  Ballot  for  Removal  from  the  Manual 
Table  of  Wires  Required  for  Stranded  and  Flexible  Conductors 


Report  of  Committee  20 — Uniform  General 
Contract  Forms 

W.  G.  Nusz,  Chairman,  N.  D.  Hyde  J.  S.  Lulie,  V ice-Chairman, 

E.  H.  Barnhart  F.  R.  Layng  C.  B.  Niehaus 

Clark  Dillenbeck  S.  L.  Mapes  H.  A.  Palmer 

W.  D.  Faucette  a.  a.  Miller  W.  M.  Post 

J.  P.  Hanley  O.  K.  Morg.an  W.  R.  Swatosh 

B.  Herman  F.  L.  Nicholson  E.  L.  Taylor 

Committee 

To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 

At  the  request  of  the  Electrical  Section  of  the  Engineering  Division,  a  subcommittee 
of  Committee  20  has  been  collaborating  with  Committee  1 — Power  Supply  of  the  Elec- 
trical Section  in  a  comparison  of  the  Form  of  Agreement  for  the  Purchase  of  Electrical 
Energy  for  Other  than  Traction  Purposes  (Manual  page  20-101)  with  a  tentative  form 
drawn  up  by  the  Committee  on  Power  Supply,  but  it  was  deemed  desirable  to  continue 
the  study  before  proposing  any  revision  of  the  form  now  in  the  Manual. 

2.  Form  of  agreement  for  commercial  signs  on  railway  property. 

A  tentative  form  of  this  agreement  was  submitted  at  the  last  convention  of  the 
Association.  All  suggestions  received  have  been  considered  and  the  committee  now  pre- 
sents a  form  of  agreement  for  adoption  as  recommended  practice page  39 

3.  Form  of  lease  for  air-right  development. 

No  report.  The  committee  has  given  this  a  great  deal  of  study  over  the  last  two 
years  but  is  unable  at  this  time  to  present  a  form  of  lease. 

4.  Form  of  agreement  for  wire  or  cable  line  crossings,  collaborating  with  Committee 
3 — Overhead  Transmission  Line  and  Catenary  Construction,  Electrical  Section,  Engi- 
neering Division,  AAR. 

The  committee  has  nothing  to  report  on  this  assignment  at  the  present  time.  Sug- 
gestions received  from  the  Rural  Electrification  Authority  for  revisions  of  the  form 
adopted  by  the  Association  on  March  12,  1940,  are  being  considered. 

5.  Form  of  agreement  for  unloading  liquefied  petroleum  and  other  gases. 

This  contract  was  prepared  at  the  request  of  the  Association  of  American  Railroads 
to  provide  protection  for  handling  these  commodities.  A  form  of  agreement  is  submitted 

for  adoption  as  recommended  practice page  41 

The  Committee  on  Uniform  General  Contract  Forms, 

W.  G.  Nusz,  Chairman. 

3Iame£f  C.  Srtoin 

Committee  20  cannot  close  its  transactions  for  the  year  without  recording  with  the 
deepest  regret  the  death  of  Past-President  James  C.  Irwin,  at  Newtonville,  Mass.,  March 
20,  1940. 

Those  who  have  had  the  opportunity  of  serving  on  Committee  20  during  the  past 
quarter  of  a  century  were  endeared  to  Mr.  Irwin  and  have  lost  in  his  passing  a  friend 


Bulletin  4J0,  Novrmber,   1940. 

37 


38 Uniform    General    Contract    Forms 

and  counselor  whose  achievements  were  many  and  whose  position  and  work  were  a 
Uving  example  to  be  followed  by  the  members  of  the  Association. 

James  Clark  Irwin  was  born  on  September  23,  1868,  at  Cheyney,  Delaware  County, 
Pa.,  the  son  of  WilUam  Henry  and  Catherine  (Browning)  Irwin.  He  attended  the  Protes- 
tant Episcopal  Academy  at  Philadelphia  and  was  graduated  from  the  University  of 
Pennsylvania  in  1890  with  the  degree  of  Bachelor  of  Science  and,  in  1891,  received  the 
degree  of  Civil  Engineer  from  the  same  university. 

He  is  survived  by  his  wife;  three  sons,  James  C,  Robert  M.,  and  John,  and  one 
daughter,  Katharine.  Another  son,  WilUam  H.,  died  in  1923,  following  mihtary  service 
in  the  World  War. 

In  1892,  Mr.  Irwin  entered  railroad  service  with  the  New  York  Central  System  and 
was  continually  in  the  service  of  this  railroad  and  its  affiliated  hnes  until  his  retirement, 
during  which  period  he  held  the  positions  of  assistant  transitman,  assistant  superintendent 
of  signals,  division  engineer,  signal  engineer,  assistant  to  general  superintendent,  engi- 
neering assistant  on  staff  of  vice-president,  resident  engineer  and  superintendent  of  con- 
struction, office  engineer,  chief  engineer  (Rutland  Railroad)  and  valuation  engineer 
(Boston  &  Albany  Railroad),  holding  the  last  named  position  until  his  retirement  on 
October  1,  1938. 

Mr.  Irwin  was  a  member  of  the  American  Society  of  Civil  Engineers;  the  American 
Standards  Association;  the  Signal  Section,  Engineering  Division,  AAR;  and  the  American 
Railway  Engineering  Association,  in  addition  to  other  important  organizations.  He  held 
many  responsible  positions  in  these  societies  and  as  a  member  of  the  AREA  he  served 
on  the  Committee  on  Uniform  General  Contract  Forms  (1909-1940),  as  vice-chairman 
(1910-1913),  inclusive,  and  1923-1926,  inclusive,  and  as  chairman  from  1927  to  1931, 
inclusive;  on  Committee  26 — Standardization  (1927-1930)  and  as  chairman  from  1931 
to  1935,  inclusive;  on  Committee  12 — Rules  and  Organization,  as  vice-chairman  (1939- 
1940);  as  director  of  the  Association  from  March,  1932  to  March,  1935;  vice-president 
from  March,  1935  to  March,  1937;  and  as  president  in  1937-1938,  as  well  as  chairman. 
General  Committee,  Engineering  Division. 

In  addition  to  the  engineering  societies  of  which  he  was  a  member,  Mr.  Irwin  was 
identified  with  many  other  organizations  and  for  15  years  he  was  active  in  St.  John's 
Church  (Episcopal),  Newtonville,  Mass.,  as  vestryman,  junior  warden  or  senior  warden. 

Mr.  Irwin's  energy,  interest,  personality,  abiUty  and  kindly  disposition  won  for  him 
a  host  of  friends  who  could  not  fail  but  be  impressed  with  his  high  standards  of  life, 
his  earnestness  and  sincerity  in  all  that  he  undertook  and  his  careful  consideration  and 
gentleness  toward  all.  He  gave  unselfishly  and  unstintingly  of  his  time  and  experience 
to  Committee  20  and  to  the  entire  Association;  nothing  was  too  difficult  for  him  to  do, 
and  no  work  that  he  undertook  was  too  laborious  for  him  not  to  give  it  scrupulous 
attention.  His  many  associates,  both  in  a  social  and  professional  way,  will  testify  that 
they  were  bettered  and  profited  by  all  their  contacts  with  Mr.  Irwin,  and  the  member- 
ship of  Committee  20,  as  well  as  his  other  friends  and  associates,  will  continue  to  miss 
him  keenly.  By  his  death,  the  committee  and  the  Association  lost  a  true  friend  and  a 
valuable  member. 

W.  D.  Faucejte,  Chairman, 
F.  L.  Nicholson, 

J.  S.  LiLLIE. 

Committee  on  Memoir 


Uniform    General    Contract    Forms 39 

Report  on  Assignment  2 
Form  of  Agreement  for  Commercial  Signs  on  Railway  Property 

0.  K.  Morgan  (chairman,  subcommittee),  E.  H.  Barnhart,  J.  P.  Hanley,  N.  D.  Hyde, 

S.  L.  Mapes,  A.  A.  Miller,  C.  B.  Nieliaus,  H.  A.  Palmer,  E.  L.  Taylor. 

Your  committee  prepared  a  form  of  agreement  and  submitted  it  to  the  Association 
in  Bulletin  413,  page  48,  November,  1939,  for  information  and  discussion.  Minor  changes 
have  since  been  made  and  the  agreement  is  now  submitted  for  approval  of  the  Association 
and  printing  in  the  Manual. 

FORM  OF  AGREEMENT  FOR  COMMERCIAL  SIGNS  ON 
RAILWAY  PROPERTY 

1940 

THIS  AGREEMENT,  made  this  day  of  ,  19...., 

by  and  between   ,  a  corporation  organized  and  existing 

under  the  laws  of  the  State  of  ,  hereinafter  called  the  Railway 

Company,  and    

hereinafter  called  the  Licensee: 

WITNESSETH: 

The  Licensee  desires  to   construct,  maintain  and  use  a  commercial  sign  upon  the 

property  of  the  Railway  Company  situated  at   and 

substantially  as  shown  on  the  plan  and  in  the  specifications  hereto  attached,  designated 

as  dated  and  made  a 

part  hereof: 

It  is  mutually  agreed  as  follows: 

1.  License 

The  Railway  Company  gives  permission  to  the  Licensee  to  construct,  maintain  and 

use  a   sign  upon  the  property  of  the  Railway  Company, 

in  accordance  with  said  plan  and  the  specifications  forming  a  part  hereof,  and  subject  to 
the  requirements  of  the  Railway  Company. 

2.  Display  Copy 

The  permission  herein  given  is  upon  the  express  condition  that  any  sign  erected 
and  advertising  displayed  thereon  during  the  term  of  this  agreement  shall  be  in  sub- 
stance, form,  kind  and  character  satisfactory  to  and  approved  by  the  

of  the  Railway  Company,  and  upon  any  breach  of  this  condition  by  said  Licensee,  such 
license  shall  terminate  at  once. 

3.  Permits  and  Taxes 

Prior  to  the  erection  of  said  sign  the  Licensee  shall,  at  its  sole  cost  and  expense, 
procure  all  necessary  consents  and  permits  from  all  public  authorities  having  jurisdiction, 
and  shall  pay  all  license  fees  and  taxes,  or  increase  of  taxes,  assessed  against  or  imposed 
on  or  by  reason  of  said  sign,  and  at  all  times  during  the  continuance  hereof,  shall  comply 
with  all  rules,  regulations  and  requirements  of  said  authorities  and  of  the  National  Board 
of  Fire  Underwriters  relative  thereto. 


40 Uniform    General    Contract    Forms 

4.  Cost  and  Maintenance 

The  Licensee  shall  at  its  sole  cost  and  expense,  in  a  manner  satisfactory  to  the 

of  the  Railway  Company,  construct  and  maintain  said 

sign  and  keep  the  land  and  buildings  appurtenant  thereto  in  a  cleanly  condition,  free 
of  litter  and  refuse  matter  occasioned  by  said  sign,  at  all  times  during  the  continuance 
of  this  agreement. 

5.  Changes  of  Structures 

The  Licensee  further  covenants  and  agrees  that  if  and  in  case  the  location  of  the 
sign  should  in  the  opinion  of  the  Chief  Engineer  of  the  Railway  Company  require 
the  strengthening  of  any  building,  roof,  sidewall  or  appurtenance  thereto,  or  increase 
the  load  so  as  to  require  additional  support,  or  to  cut  through  any  roof  for  the  attach- 
ment of  said  sign  or  its  supports,  the  same  shall  be  done  and  said  alterations  thereafter 
maintained  during  the  term  of  this  agreement  by  the  Licensee  at  its  sole  cost  and 
expense,  and  to  the  satisfaction  of  the  Chief  Engineer  of  the  Railway  Company. 

6.  Removal 

Upon  notice  of  termination  of  the  license,  the  Licensee  shall  at  once  and  at  its  sole 

cost  and  expense  remove  said  sign  and  restore,  if  requested  by  the 

of  the  Railway  Company,  the  Railway  Company's  property  to  its  former  condition; 

and  if  the  Licensee  within  days  shall  fail  so  to  do,  said  sign  shall  forthwith 

become  the  property  of  the  Railway  Company,  and  all  right,  title  and  interest  therein 
of  the  Licensee  shall  terminate,  or  the  Railway  Company  may,  at  its  option,  remove 
said  sign  and  restore  the  Railway  Company's  property  to  its  former  condition  at  the 
sole  cost  and  expense  of  the  Licensee,  which  cost  and  expense  the  Licensee  covenants 
and  agrees  to  pay  upon  demand. 

7.  Rentals 

The  Licensee  shall  pay  as  rental  therefor   Dollars 

($ )   per  annum,  in  advance,  for  each  year  and  at  the  same  rate  for  any 

part  of  a  year  unexpired  at  the  termination  of  this  license. 

8.  Liability 

The  Licensee  shall  not  in  any  way  or  at  any  time  interfere  with  the  safe  passage 
of  the  Railway  Company's  trains;  and  shall  indemnify  and  save  harmless  the  Railway 
Company  from  any  and  all  damage,  loss  or  injury,  including  injury  resulting  in  the 
death  of  any  person  whomsoever,  suits,  claims,  liabilities,  recoveries,  or  demands  resulting 
directly  or  indirectly  from  the  installation,  maintenance,  use  or  existence  of  said  sign, 
whether  caused  by  the  negligence  of  the  Railway  Company  or  otherwise. 

9.  Risk 

The  Licensee  assumes  all  risk  of  loss  or  damage  to  its  property  on  the  premises 
of  the  Railway  Company,  however  caused,  and  hereby  releases  the  Railway  Company 
from  all  liability  on  account  of  such  loss  or  damage. 

10.  Term 

This  agreement  shall  continue  in  force  for  years,  and  thereafter  from 

year  to  year  until  terminated  by  either  party  giving  to  the  other days*  notice 

in  writing  at  the  last  known  address,  of  its  intention  so  to  do  and  upon  the  expiration 
of  the  time  mentioned  in  such  notice  this  agreement  shall  terminate. 


Uniform    General    Contract    Forms 41 

11.  Assignment 

This  agreement  shall  not  be  assigned  or  in  any  manner  transferred  without  the 

written  consent  of  the   of  the  Railway  Company. 

Until  terminated  as  herein  provided,  this  agreement  shall  inure  to  the  benefit  of  and 
be  binding  upon  the  legal  representatives  and  successors  of  the  parties  respectively. 

In  Witness  Whereof,  the  parties  hereto  have  executed  this  agreement  in   

,  the  day  and  year  first  above  written. 

Company 

Attest  By  

Secretary 

Licensee 

Witness    By  


Report  on  Assignment  5 

Form  of  Agreement  for  Unloading  Liquefied  Petroleum 
and  Other  Gases 

W.  R.  Swatosh   (chairman,  subcommittee),  W.  D.  Faucette.  F.  R.  Layng,  J.  S.  Lillie, 
A.  A.  Miller,  F.  L.  Nicholson,  W.  M.  Post. 

Your  committee  submits  the  following  form,  which  was  prepared  at  the  request  of 
the  Association  of  American  Railroads  and  has  received  the  approval  of  its  Law  Depart- 
ment and  the  endorsement  of  the  General  Committee  of  the  Engineering  Division.  The 
matter  of  protecting  the  railroads  appears  to  be  urgent  and  this  agreement  is  submitted 
for  adoption  and  printing  in  the  Manual. 

FORM  OF  AGREEMENT  FOR  UNLOADING  LIQUEFIED 
PETROLEUM  AND  OTHER  GASES 

(Using  Railway  Facilities) 

1940 

THIS  AGREEMENT,  made  this  day  of ,  19. . . . , 

by  and  between  ,  a  corporation,  organized  and  existing 

under  the  laws  of  the  State  of ,  hereinafter  called  the  Railway 

Company,  and    , 

hereinafter  called  the  Industry: 

WITNESSETH; 

Whereas,  the  Industry  desires  to  unload  

(Liquefied  petroleum  gas,  chlorine  gas,  etc.) 
from  an  industry  track  located  on  the  premises  of  the  Railway  Company  at  or  near 

Station,   County    of    , 

State  of   ,  described  as  follows: 


. ,  and 


42 Uniform    General    Contract    Forms 

Whereas,  the  Railway  Company  desires  to  license  and  permit  the  Industry  to  use 
certain  unloading  facilities  along  the  Industry  track  belonging  to  the  Railway  Company, 
the  facilities  to  be  operated  by  the  employees  of  the  Industry. 

Now,   Therefore,  in   consideration   of   the  payment   to   the   Railway   Company   of 

Dollars   ($ ) ,  the  receipt  of 

which  is  hereby  acknowledged,  and  the  covenants  herein  contained,  it  is  mutually  agreed: 

1.  Grant 

That  the  Railway  Company  hereby  grants  the  right  and  permission  to  the  Industry 
to    use   its   facilities,    located   along    the   industry    track   for   the   purpose   of    unloading 

without  charge  to  the  Industry,  except 

(liquefied  petroleum  gas,  chlorine  gas,  etc.) 
as   herein   provided,   the   unloading   facilities   to   be   operated   by   the   employees   of   the 
Industry. 

2.  Ownership  of  Facilities 

It  is  understood  that  the  title  to  and  the  sole  ownership  of  all  of  the  facilities  shall 
remain  in  the  Railway  Company  and  that  the  Industry  does  not  acquire  any  interest 
therein. 

3.  Use  by  Others 

The  permission  herein  granted  to  the  Industry  is  not  for  the  exclusive  use  of  the 
above  described  unloading  facilities;  it  being  understood  and  agreed  that  such  facilities 
may  be  used  also  by  other  patrons  of  the  Railway  Company.  It  is  understood  and 
agreed  further  that  the  Industry  shall  not  use  the  unloading  facilities  for  the  benefit  of 
any  other  person,  firm  or  corporation,  without  the  written  consent  of  the  Railway 
Company. 

4.  Permits  and  Licenses 

The  Industry  shall  obtain,  at  its  expense,  any  and  all  authority,  license  and  permis- 
sion from  municipal  and  governmental  authorities  that  may  be  necessary  for  it  to  unload 
or  handle  the  commodity  herein  specified. 

5.  AAR  Circulars  and  Instructions 

It  is  understood  and  agreed  that  in  using  the  facihties,  the  Industry  shall  fully 
comply  with  and  be  governed  by  Circular  17A  or  17B,  dated  May  1,  1939,  and  Circular 
17C,  dated  October  10,  1940,  of  the  Association  of  American  Railroads,  respectively,  and 
amendments  to  or  reissues  thereof,  or  such  other  circulars  and  instructions  as  may  be 
issued  from  time  to  time  by  either  the  AAR  or  the  Bureau  of  Explosives,  and  that  the 
unloading  shall  also  be  under  the  jurisdiction  of  and  subject  to  the  instructions  of  the 
of  the  Railway  Company. 

6.  Clearances 

The  Industry  shall  not  place  or  permit  any  obstructions  over  the  Industry  Track 

less  than feet  above  the  top  of  the  rail  nor  alongside  of  the  said  track  less 

than feet  from  the  center  of  the  track. 

7.  Liability 

The  Industry'  agrees  that  it  will  protect,  indemnify,  and  forever  hold  harmless  the 
Railway  Company  from  any  and  all  claims,  liabilities  and  expenses  which  the  Railway 
Company  shall  incur  by  reason  of  any  real  or  alleged  injury  (including  injury  resulting 
in  death)  to  any  person  or  persons  whomsoever,  (including  the  employees  of  the  parties 


Uniform    General    Contract    Forms  43 

hereto),  and  from  all  loss,  claims,  liabilities  and  expenses  by  reason  of  any  real  or  alleged 
damage  to  or  destruction  of  property  (including  the  property  of  the  parties  hereto), 
arising  out  of,  or  in  any  way  attributable  to  the  use  of  said  unloading  facilities  by  the 

Industry,  or  the  unloading  of or  the  removal 

(liquefied  petroleum  gas,  chlorine  gas,  etc.) 
of  the  same  from  the  premises  of  the  Railway  Company  by  the  Industry,  regardless  of 
whether  or  not  such  injury  or  damage  is  caused  by  the  negligence  of  the  Railway  Com- 
pany, its  agents  or  employees. 

8.  Assignment 

The  Industry  shall  not  assign  this  contract  nor  any  rights  thereunder  without  the 
written  consent  of  the  Railway  Company. 

9.  Duration  and  Cancellation 

This  agreement  shall  be  in  effect  after  19 ... . 

and  continue  in  effect  until  terminated  by   days'  written  notice  from  either 

party  to  the  other.  Such  notice  shall  be  sufficiently  given  and  delivered  if  deposited  in 
the  United  States  mail,  enclosed  in  an  envelope,  properly  stamped  and  addressed  to  the 
Railway  or  to  the  Industry,  as  the  case  may  be.  All  notices  or  other  communications 
from  one  party  to  the  other  with  respect  to  this  contract  shall  be  addressed,  as  the  case 

may  be,  to  the Railway  Company, 

(Street  and  Number)    (City)    (State)   or  the 

(Industry) ,   (Street  and  Number) 

(City)     (State) ,    unless   and   until   notice  in 

writing  of  a  change  of  address  shall  have  been  given  by  one  party  to  the  other,  in  which 
event  the  new  address  shall  be  used. 

As  hereinbefore  provided,  this  agreement  shall  inure  to  the  benefit  of  and  be  binding 
upon  the  parties  hereto,  their  heirs,  executors,  administrators,  successors  and  assigns. 

In  Witness  Whereof,  the  parties  hereto  have  executed  this  agreement  in 

,  the  day  and  year  first  above  written. 


Railway  Company 
By    


Industry 
Witness: 


Witness: 


Report  of  Committee  16 — Economics  of  Railway 
Location  and  Operation 


H.  M.  Stout,  Chairman, 
E.  G.  Allen 
E.  Y.  Allen 

B.  T.  Anderson 
J.  A.  Anderson 
S.  E.  Armstrong 
T.  B.  Ballantyne 
J.  W.  Barriger,  III 

C.  H.  Blackman 
V.  T.  Boughton 
J.  C.  Bradley 

C.  W.  Breed 

Richard  Brooke 

J.  L.  Campbell 

S.  B.  Clement 

L.  E.  Dale 

Miss  Olive  W.  Dennis 

J.  H.  Dyer 

H.  H.  Edc5erton 

J.  A.  Erskine 

E.  K.  Eugene 


J.  M.  Farrin 
R.  P.  Forsberg 
G.  W.  Hand 
J.  L.  Haugh 
C.  H.  R.  Howe 
E.  A.  Humphreys 
W.  B.  Irwin 
E.  E.  Kimball 

E.  E.  King 
A.  W.  Laird 
Fred  Lavis 

R.  S.  Marshall 

F.  H.  McGuigan,  Jr. 

L.   G.   MORPHY 

F.  N.  Nye 
J.  A.  Par\nt 
H.  R.  Peterson 
J.  W.  Porter 
J.  F.  Pringle 
C.  P.  Richmond 
L.  S.  Rose 


M.  F.  Mannion,  Vice- 
chairman, 

E.  H.  Roth 

F.  A.  Russell 
H.  F.  Schryver 

B.  J.  Schwendt 
O.  E.  Selby 

H.  M.  Shepard 
H.  A.  Shinkle 
L.  K.  Sillcox 
H.  W.  Snyder 

C.  B.  Stanton 
R.  R.  Strother 
J.  E.  Teal 

H.  M.  Tremaine 
W.  D.  Wiggins 
H.  W.  Williams 

S.   L.   WONSON 

J.  A.  Wood 

J.  S.  WORLEY 

Committee 


To  the  American  Railway  Engineering  Association: 

Your  committee  submits  its  report  on  the  following  subjects: 

1.  Revision  of  Manual. 

A  new  study  of  "the  cost  of  stopping  and  starting  trains",  preliminary  to  recom- 
mendation of  the  revision  of  the  material  now  in  the  Manual,  section  21,  pages  2-5,  has 
been  begun.  In  this  the  collaboration  of  the  Signal  Section,  Engineering  Division,  AAR, 
has  been  secured.  No  report. 

2.  Methods  for  obtaining  a  more  intensive  use  of  existing  railway  faciUties. 
Progress  report,  directed  to  the  intensification  of  use  of  railway  faciUties  resulting 

from  the  operation  of  the  port  control  organization  recently  set  up.    Submitted  as  in- 
formation . .    page  45 

3.  Methods  or  formulas  for  the  solution  of  special  problems  relating  to  more  eco- 
nomical and  efficient  railway  operation. 

Progress  report;  supplementary  discussion  of  the  sub-topic  (k)  Economic  relation 
between  track  structure  and  traffic  to  be  handled.  Submitted  as  information....  page  48 

4.  Effect  of  volume  of  traffic  on  railway  operating  expenses,  collaborating  with 
Committee  22 — Economics  of  Railway  Labor. 

Progress  report.  This  year  there  is  presented  a  method  for  determining  the  effect  of 
volume  of  traffic  on  transportation  expenses.  Submitted  as  information page  SO 

5.  Effect  of  inland  waterway  transportation  on  the  economics  of  railway  operation, 
collaborating  with  AAR  Committee  on  Waterway  Projects  and  with  Committee  25 — 
Waterways  and  Harbors. 

No  report. 


Bulletin  420,  November,   1940. 


44 


Economics   of    Railway   Location   and    Operation  45 

6.  Effect  of  high  speed  on  railway  operating  expenses. 

Progress  report.  Analysis  of  increase  in  power  requirements  and  the  resulting  in- 
creases in  costs  due  to  increases  in  speed  in  hauling  a  given  volume  of  traffic.  Submitted 
as  information page  56 

7.  Effect  of  rail  lubrication  on  train  operation,  collaborating  with  Committee  5 — 
Track. 

No  report. 

8.  Economics  of  railway  location  and  operation  as  affected  by  railway  electrification, 
collaborating  with  Electrical  Section,  Engineering  Division,  AAR. 

Progress  report — submitted  as  information page  68 

9.  Effects  of  speeds  in  excess  of  75  miles  per  hour  on  the  economics  of  railway 
location. 

No  report. 

10.  Effect  of  highway  transportation  on  the  economics  of  railway  operation. 
No  report. 

11.  Train  resistance  of  freight  trains  under  various  conditions  of  loading  and  speed. 
Progress  report.  Introductory  to  the  work  on  this  assignment  a  resume  of  some  of 

the  more  important  work  which  has  been  done  in  the  establishment  of  general  resistance 
formulas — submitted  as  information page  69 

12.  Development  of  modern  power  units  and  the  effects  on  the  economics  of  railway 
location  and  operation. 

No  report. 

13.  The  general  course  of  the  cost  of  railway  transportation  and  operation  over  the 
past  100  years,  the  principal  determining  elements  and  the  economic  significance. 

No  report. 

14.  The  advantage  derived  from  stiffness  of  track  in  improving  economics  of  train 
operation. 

No  report. 

The  Committee  on  Economics  of  Railway  Location  and  Operation, 

H.  M.  Stout,  Chairman. 


Report  on  Assignment  2 

Methods  for  Obtaining  a  More  Intensive  Use  of  Existing 
Railway  Facilities 

L.  E.  Dale  (chairman,  subcommittee),  E.  Y.  Allen,  B.  T.  Anderson,  C.  H.  Blackman, 
C.  W.  Breed,  J.  H.  Dyer,  W.  B.  Irwin,  H.  F.  Schryver,  B.  J.  Schwendt,  H.  A. 
Shinkle,  J.  A.  Wood. 

Previous  studies  and  reports  made  by  this  subcommittee  have  discussed  the  accom- 
plishment of  the  desired  objective  by  means  of  pooling,  coordinating  terminals  antl 
consolidating  railroads.  The  present  report  describes  a  plan  made  effective  by  the  Asso- 
ciation of  American  Railroads  which  has  been  designed  to  insure  the  maximum  use  of 
railroad  facilities  and  equipment  at  the  Atlantic  and  Gulf  ports  through  cooperative 
efforts  of  individual  railroads,  shippers  and  receivers  of  freight  and  the  steamship  com- 
panies and  so  avoid  a  repetition  of  congestion  and  delay  to  traffic  such  as  occurred 
during  the  World  War. 


46 Economics   of    Railway   Location    and   Operation 

An  unprecedented  rate  of  increase  in  railroad  traffic,  starting  the  middle  of  August 
1939,  when  weekly  revenue  carloadings  totalled  660,000,  reaching  800,000  cars  by  the 
middle  of  September  and  a  peak  of  about  860,000  cars  in  October  (this  increase  being 
coincident  with  the  start  of  the  European  War),  directed  attention  to  the  necessity  for 
effective  action  to  prevent  any  recurrence  of  rail  traffic  congestion  such  as  was  experienced 
at  the  end  of  1917.  At  that  time  in  the  territory  north  of  the  Ohio  and  Potomac  rivers 
and  east  of  the  Mississippi  river  and  Chicago  62,247  carloads  of  freight  were  delayed 
short  of  their  ultimate  destination,  in  addition  to  which  there  were  held  by  the  lines  at 
and  west  of  St.  Louis,  31,421  carloads;  at  and  west  of  Chicago,  24,836  carloads;  at  and 
south  of  the  Ohio  river  gateways  14,061  carloads;  and  at  and  south  of  the  Potomac  river 
gateways  1S,S4S  carloads.  Most  of  this  freight  was  for  destinations  within  a  line  drawn 
from  Portland,  Me.,  through  Albany,  N.Y.,  and  Rochester,  Harrisburg,  Pa.,  and  Balti- 
more, Md.  Delivery  could  not  be  made  because  of  large  accumulations  of  cars  already 
at  terminals  awaiting  delivery. 

The  significance  of  these  figures  is  that  this  use  of  railroad  equipment  for  storage 
purposes,  due  to  inabiUty  to  release  cars  at  destination,  was  a  major  cause  contributing 
to  congestion,  and  that  congestion  can  be  prevented  by  avoiding  such  misuse  of  railroad 
equipment. 

Because  of  the  probabiUty  that  a  substantial  increased  movement  of  export  freight 
would  take  place,  the  AAR,  through  its  Car  Service  Division,  placed  in  effect  early  in 
November  1939,  a  plan  for  preventing  serious  congestion  at  Atlantic  and  Gulf  ports. 
Under  that  plan,  a  manager  in  charge  of  port  traffic  was  appointed  to  direct  a  system 
for  controlling  the  movement  of  rail  traffic  to  these  ports  to  the  extent  necessary  to 
prevent  accumulation  of  more  traffic  than  can  be  promptly  unloaded. 

During  the  first  ten  months  that  the  plan  has  been  in  effect  it  has  been  necessary 
to  exercise  control  over  the  movement  of  freight  in  only  one  instance,  i.e.,  bulk  grain 
and  soy  beans  for  handling  through  the  public  elevator  at  New  Orleans,  La.,  due  to 
limited  storage  space.  In  the  month  of  December  1939,  over  250  cars  were  handled  by 
permit,  and  additional  grain  was  accepted  as  rapidly  as  ships  were  available  to  transport 
the  grain  from  the  port. 

There  have  been  two  instances  where  cars  accumulated  more  rapidly  than  the 
facilities  available  appeared  able  to  dispose  of  them  currently,  and  each  of  these  situ- 
ations was  quickly  resolved  through  cooperative  action  of  the  several  interests  directly 
concerned. 

Under  the  plan  now  in  operation  no  restriction  is  contemplated  on  the  movement 
by  rail  of  any  freight,  export  or  domestic,  to  Atlantic  and  Gulf  ports  so  long  as  facil- 
ities are  available  to  transfer  such  freight  promptly  to  ships  or  into  warehouses,  thus 
avoiding  the  use  of  freight  cars  for  storage  purposes. 

The  plan  placed  in  effect  by  the  Car  Service  Division  is  comparatively  simple. 
Under  it  a  manager  of  port  traffic  is  located  at  New  York.  He  has  complete  authority 
with  respect  to  the  supervision  of  any  control  placed  on  traffic  moving  to  or  through 
any  port.  At  each  of  the  principal  Atlantic  and  Gulf  ports,  local  committees  consisting 
of  representatives  of  the  port  and  of  the  railroads  entering  these  ports  have  been  created. 
Each  of  these  committees  keeps  closely  in  touch  with  the  situation.  Written  detailed 
reports  are  made  at  regular  intervals  to  the  manager  of  port  traffic,  advising  him  as  to 
the  number  of  loaded  cars  received  daily,  the  number  unloaded,  the  number  held  for 
unloading  and  other  pertinent  information  pertaining  to  the  situation  at  that  port. 

The  manager  in  charge  of  port  traffic  has  thus  far  devoted  his  attention  largely  to 
keeping  in  close  touch  with  the  situation  at  the  various  ports  along  the  Atlantic  and 
Gulf  coasts  in  order  to  make  sure  that  no  congestion  develops  and  to  bringing  about 


Economics   of    Railway   Location    and    Operation  47 

increased  cooperation  on  the  part  of  shippers,  exporters,  steamship  operators  and  port 
authorities  in  utilizing  to  the  maximum  the  facilities  already  available.  Should  a  sudden 
increase  in  freight  traffic  develop,  or  other  circumstances  arise,  the  manager  of  port 
traffic  has  authority  under  the  plan  to  require  that  before  any  freight  for  export  is 
loaded  on  freight  cars  for  shipment  that  formal  assurances  be  given  that  the  shipment 
will  be  promptly  unloaded  at  destination  so  that  the  cars  will  be  promptly  released  and 
returned  to  active  service. 

Because  of  the  heavy  movement  of  export  freight  through  the  Port  of  New  York 
special  attention  has  been  given  this  area.  A  daily  report  is  received  by  the  secretary  of 
the  General  Managers'  Association  (which  includes  all  roads  operating  within  the  New 
Vork  area)   showing  the  following  information: 

(a)  Car  float  freight  for  New  York  station  delivery. 

(b)  Car  float  freight  for  Brooklyn  terminal  delivery. 

(c)  Freight  for  New  Jersey  terminal  deUvery. 

(d)  Freight  interchanged  by  car  float. 

(e)  Freight  interchanged  by  rail. 

(f)  Tidewater  coal  situation. 

(g)  Company  fuel  situation. 

(h)   Grain — received,  on  hand,  in  cars,  elevators  and  boats, 
(i)    Cars  released  and  on  hand  in  the  several  Brooklyn  terminal  companies, 
(j)    Lighterage  freight  unloaded  and  on  hand. 

(k)   Carload  freight  in  storage  on  covered  piers,  open  piers  and  ground. 
(1)    Carload  storage  space  available  but  not  used, 
(m)  Cars  held  outside  the  terminal  district  awaiting  movement  to  it. 
(n)   Number   of   Hghters   held   at   steamship   piers   in   excess   of   48   hours   awaiting 
unloading. 

This  information  is  given  the  manager  of  port  traffic  by  the  secretary  of  the  General 
Managers'  Association  each  day,  together  with  supplemental  information  at  intervals 
showing  the  detail  of  railroad  lighters  delayed  by  steamship  companies  and  cars  on 
hand  over  IS  days  for  unloading,  so  that  the  manager  of  port  traffic  has  currently  a 
picture  of  the  port  operations  before  him.  His  point  of  contact  with  the  railroads  at 
New  York  is  the  secretary  of  the  General  Managers'  Association,  with  whom  any  ques- 
tion pertaining  to  operating  conditions  in  the  New  York  district  is  handled. 

The  Maritime  Association  of  the  Port  of  New  York,  through  its  Traffic  Advisory 
committee,  is  the  point  of  contact  for  the  manager  of  port  traffic  with  the  steamship 
people.  Conferences  are  held  regularly  between  this  committee  and  the  Lighterage  com- 
mittee of  the  General  Managers'  Association,  for  the  discussion  of  mutual  problems 
pertaining  to  the  handUng  of  hghterage  freight  in  the  New  York  district.  Illustrative  of 
the  effectiveness  of  the  work  done  is  the  fact  that  prior  to  November  IS  the  average 
number  of  lighters  delayed  over  48  hours  awaiting  unloading  to  ships  was  over  ISO  daily. 
During  December  1939,  this  average  was  104;  during  January  1940,  it  was  lOS;  March, 
88;  and  May,  7S.  The  volume  of  traffic  handled  increased  during  this  period. 

Records  show  that  the  volume  of  business  handled  through  the  Port  of  New  York 
during  the  first  six  months  of  1940  has  approximated  two-thirds  of  the  volume  handled 
daily  during  the  peak  of  the  World  War  movement.  The  volume  handled  on  peak  days 
has  approached  that  of  1918.  During  the  month  of  August  the  tons  of  export  freight 
handled  through  the  North  Atlantic  ports  exceeded  that  handled  August  1918,  and  the 
volume  at  the  Port  of  New  York  practically  equalled  that  handled  in  August  1918. 
This  traffic  has  been  handled  without  congestion  and  with  satisfaction. 


48 Economics    of    Railway    Location    and   Operation 


Report  on  Assignment  3 

Methods  or  Formulas  for  the  Solution  o£  Special  Problems  Relating 
to  More  Economical  and  Efficient  Railway  Operation 

C.  H.  R.  Howe  (chairman,  subcommittee),  J.  L.  Campbell,  J.  A.  Erskine,  J.  M.  Farrin, 
H.  R.  Peterson,  E.  H.  Roth,  H.  F.  Schryver,  H.  A.  Shinkle,  J.  A.  Wood. 

Economic  Relation  Between  Track  Structures  and  Traffic 
to  Be  Handled 

Your  subcommittee  desires  to  supplement  its  reports  on  this  subject,  published  in 
Volumes  40  and  41  of  the  Proceedings,  with  a  graphical  illustration  (Chart  IX)  showing 
the  economical  limitations  of  rail  weights  which  may  be  used  with  various  traffic  densi- 
ties. The  basic  data  used  in  preparing  the  chart  are  shown  in  the  accompanying  Tables 
F  and  G. 

The  investment  values  given  in  Table  G  are  assumed,  as  they  would  vary  in  any 
given  case.  The  costs  of  labor  shown  are  actual,  being  derived  from  the  average  man- 
hours  spent  by  each  group  of  railways  for  the  year  1936,  as  reported  to  the  Interstate 
Commerce  Commission.  However,  as  the  labor  hours  published  by  the  commission  are 
given  per  equated  mile,  it  is  essential  that  a  conversion  be  made  into  hours  per  main 
track  mile,  in  terms  of  which  calculations  are  customarily  made.  The  conversions  are 
shown  in  Table  F.  The  conversion  into  money  was  accomphshed  by  using  a  fiat  rate  of 
40  cents  per  hour.  The  basic  labor  costs  and  the  respective  average  traffic  densities,  are 
those  shown  in  Tables  A  and  C  of  the  report  of  this  subcommittee  beginning  on  page  130 
of  Vol.  40  of  the  Proceedings. 

It  will  be  noted  on  the  chart  that  the  intersection  of  the  horizontal  line,  representing 
the  cost  to  own  and  maintain,  and  the  vertical  line,  designating  the  average  traffic 
density  of  any  particular  group,  is  taken  as  the  point  of  origin  for  increased  cost  as 
traffic  density  increases.  It  will  be  noted  also  that  the  slope  of  the  line  indicating  the 
rate  of  cost  increase  is  determined  by  the  cost  to  the  lighter  weight  rail  group  of  handling 
the  traffic  density  of  the  next  higher  heavier  weight  rail  group. 

In  the  application  of  this  mathematical  procedure  the  interest  rate  on  the  invest- 
ment will  remain  the  same,  but  the  replacement  costs  will  increase  approximately  in 
direct  proportion  to  the  increase  in  traffic  density.  The  increases  in  labor  costs  are 
obtained  through  the  use  of  the  formula  evolved  on  page  134,  Vol.  40  of  the  Proceedings, 
namely,  1.00  +  (0.3855  X  percent  traffic  density  increase). 

Take  for  example  the  112-lb.  rail  costs  for  handling  a  traffic  density  of  5,248,898 
g.t.m.  per  mile  and  determine  the  costs  of  handhng  the  11,309,126  g.t.m.  traffic  of  the 
131 -lb.  rail  group  on  the  lighter  rail. 

Interest  remaining  the  same  $1,290 

Replacement  cost  increasing  in  the  ratio 

11,309,126  _  2  15  w  0.05%  =  0.108 

5,248,898 
Investment  $25,800  X  0.108  =  $2,786 

Increased  labor  cost,  1  +    (0.386  X  116)   =  1.448 

$614  X  1-448  =  $    889 

Total  cost  for   131-lb.   track  traffic  on   112-lb.  track    $4,965 


49 


CHART  No.  IX 


■ 

- 

- 

- 

r- 

r- 

- 

I— 

TRAFFIC 

[ 

)ENS 

TIE 

S   1 

RE( 

9 

jm 

EC 

TO 

JUSTIFY  INCREASED  RAIL  WEIGHT 

-i 

-1 

-, 

-r- 

j, 

— — i   1   1 
,  ,  ;  1 

- 

- 

- 

- 

- 

- 

--- 

-- 

-- 

- 

— 

II 

— 

I 

: 

- 

~ 

J 

: 

- 

- 

- 

- 

- 

- 

h 

u 

- 

~ 

~ 

-- 

^ 

~ 

- 

-- 

>V85_ 

»3floa 

'  1  ! 

- 

-« 

- 

_ 

J 

_ 

-^ 

_. 

.2i. 





_ 

_ 

_ 

lO- 

_ 

_ 

_ 

_ 

_ 

^_ 

_ 

^ 

1 

i_ 

_ 

_ 

: 

^  '■' 

- 

-o 

— 

1 

- 

-H 

— 

P      1 

-- 

- 

- 

- 

1°"^ 

- 

^ 

- 

- 

- 

- 

r 

- 

r 

- 

- 

- 

- 

-- 

r 

- 

- 



_      ^-^ 

M 

~r»t^ 

- 

- 

-- 

— 

- 

— 

s- 





, 

- 

- 

_ 

^ 

- 

- 

- 

- 

- 

_ 

- 

_ 

^ 

_ 

_ 

__ 

- 

_ 

i 

^ 

__ 

— M-s^ 

~ 

'~ 

~ 



1 — 

' 

" 

- 

^ 

7- 

-^ 

-1 

- 

- 

- 

- 

- 

- 

- 

- 

- 

- 

- 

-- 

;:--*- 

^ 

- 

- 

-- 

M 

o 

>i 

, 

-:^''- 

& 

o 

o 

S 

^ 

W 

rTi 

-e 

-•  "^ 

^ 

". 

'] 

-- 

^ 

'' 

7 

»*,ooa 

1 

^ 

"■ 

, 

.- 

■ 

~^ 

■  1 

1 

2 

» 

•3JZ6H3 

-Av^ 

. 

1 

1 

r~_ 

__ 

_ 

. 

_ 

_ 

J 

1 

_ 

_ 

_ 

_ 

_ 

_ 

_ 

_ 

- 



^ 

_ 

_ 





_      _                          

i  1      ! 

_, 

r 

h 

u 

« 

K 
K- 
X 
< 
Z 
< 

2 

1  ' 

, 

^ 

'' 

u 

■  1 

$3,4^27 

iW32^ 

^' 

1 

.-'t 

S  i  i 

.-1 

»3.l94-ll2'Av. 

-^,.^ 

; 

r 

'■ 

1 

-  "■+  ~ 

--fT-1-r 

1    1 

1 

^ 

tioca 

*Ae!i4r» 

i:£v^^« 

i  J'"' 

■      1 

1 

<-^ 

»^A54-9£ 

_^ 

•   1 

1 

IT 

r 

1 

k 

. 

_ 

_ 

I'll 

1 

i 

_ 

_ 

_ 

_  _ 

-^ 

_ 

_ 

_ 

__ 

z 

i 

_ 

< 



1 

_ 

_ 

_ 

_  _ 

_ 

_ 

_ 

_ 

__ 

r 

;     1 

^ 

i?: 

:» 

o 

o 
»- 

s 

•  2/>00. 

- t  t 

"t   ! 

■  i  !  r 

i  1  !  1 

a 

-  — o 

J- 

1= 

-'- 

j: 

-Vii 

-- 

- 

2 

- 

- 

- 

- 

; 

2 

2 

- 

- 

-^ 

- 

- 

- 

- 

2 

-- 

^ 

- 

- 

- 

- 

-- 

WM4 

:z::::::z:|;E 

u 

o 
o 

_ — . o 

1- — s 

l! 

u 
^- 

— 

i_ 

— 

^ 

—  c 

c 

—  c 

c 

1 

\- 
J 

J_ 
\- 

P. 

n 

-'- 

- 

—  c 

Gro 

55  T 

ON 

=8 
-§ 

le; 

§                                    g 
o 1 

=                              °.                                 1 
5  Per  Main  Track  Mile  Per  Year 

- 

- 
_ 

- 

- 

- 

- 

2 

0' 
0- 

0- 

^ 

_ 

- 

8 
0 
0 
0 

E 

-" 

lEEE-IEEEEE 

0 

q 

Economics    of    Railway    Locat  ion    and    Operation 


49 


tsa 


CO       CO       o 


;;>£.>«  ,>•  (DOOM-* 


^  a 


115       <0       00 


=0  O  fe^l    rtr-T-nVT 


5A 


^  -Q. 


S-C 


■a  bS^^  fc?^  fcS'S 


a  P 


-S   A^   •-    OOMOOOO 

i^  ^"^v  50N00O 

<0OM 


t-i.fihcaoo-^oo 
5;  2  o  Oi-iNco 


M       03       CO    CO 


(14 


~  ^       b  o>-*ooo 

o-c:'^    .  .  «  - 
lJ  Lrl  5  I    o  t-  oi  u5 


O  j! 


•Q.    .   .'" 


A           NCOTiit- 

o 

.    c  1^ 

^ 

i             C 

i2ae3|3«5g 

H 

a  c  1?  u 

t- 

ObcS^-^-^^ 

«9- 

•3 


to-^co'* 

~   W   tj    lOlOOiOO 
CT3    H        *     -     ..     - 


b) 


in      iri      o  10 


<u  >2  u  M<  o  ■*  t- 

rs5  o     -   '  -  - 


m     10     00  iJ5 


£55:2 
00N.-1 


O        rt    CO 


50 Economics   of    Railway    Location    and   Operation 

It  is  the  opinion  of  this  committee  that  any  railway  preparing  a  similar  chart, 
substituting  its  local  factoral  values,  will  find  it  provides  a  simple  solution  of  many  rail 
weight  problems. 


This  report  is  submitted  as  information. 

Report  on  Assignment  4 
Effect  of  Volume  of  Traffic  on  Railway  Operating  Expenses 

J.  F.  Pringle  (chairman,  subcommittee),  C.  H.  Blackman,  Richard  Brooke,  S.  B.  Clement, 
C.  H.  R.  Howe,  J.  A.  Parant,  B.  J.  Schwendt,  H.  A.  Shinkle,  J.  A.  Wood,  J.  S. 

Worley. 

In  previous  reports  the  committee  has  shown  by  analysis  of  mass  statistical  data  the 
effect  of  volume  of  traffic,  measured  by  gross  ton-miles,  on  operating  expenses  as  a  whole. 
While  this  method  of  approach  is  of  considerable  interest,  your  committee  is  of  the 
opinion  that  a  method  whereby  estimates  can  be  made  with  a  reasonable  degree  of 
accuracy  of  the  effect  of  traffic  volume  on  each  of  the  general  expense  accounts  under 
the  peculiar  conditions  that  pertain  on  any  particular  road  will  be  of  practical  value. 

Railway  accounting  divides  operating  expenses  into  six  general  accounts.  The  fol- 
lowing shows  these  and  their  relative  importance  on  Class  I  American  and  Canadian 
railways: 

Approximate 
percentage  of 
total  operating 
General  account  expense 

1.  Maintenance  of  way  and  structures   16 

2.  Maintenance  of  equipment    26 

3.  Traffic  expense    4 

4.  Transportation    49 

5.  Miscellaneous  operations    1 

6.  General     4 

Total     100 

The  Association  has  adopted  a  prior  report  of  the  committee  offering  a  method 
whereby  the  effect  of  traffic  density  as  expressed  in  gross  ton-miles  on  maintenance  of 
way  and  structures  expense  can  be  determined. 

The  effect  of  volume  of  traffic  on  maintenance  of  equipment  expenses  has  been  studied 
and  a  report  made  thereon  by  the  Mechanical  Division  of  the  AAR. 

Your  committee  this  year  submits  as  information  a  method  for  determining  the 
effect  of  volume  of  traffic  on  transportation  expenses. 

It  is  recognized  that  certain  primary  accounts  of  this  group  of  expenses  bear  a 
direct  relationship  to  traffic  density  while  others  are  more  or  less  independent  and  vary 
only  to  a  minor  extent  even  with  large  variation  in  traffic  volume. 

Volume  of  railway  traffic  is  measured  by  units  chosen  to  reflect  the  resulting 
revenue  and  expense  items  and  no  one  of  these  units  can  be  used  to  the  exclusion  of 
others  in  a  study  of  the  effect  of  volume  on  transportation  expense. 

The  common  measure  of  volume  of  railway  traffic  is  gross  revenue  but  this  in  itself 
cannot  be  used  as  a  measure  of  transportation  expense  and  the  first  step  in  determining 
the  effect  of  volume  is  the  establishing  of  the  relationship  between  revenue  and  certain 


Economics    of    Railway    Location    and   Operation 51 

units  which  can  be  used  to  measure  transportation  expense  as  expressed  in  the  various 
primary  accounts. 

Railway  revenues,  for  the  purpose  of  this  study,  may  be  divided  as  between — 

(1)  freight  revenue,  including  switching 

(2)  passenger  revenue,  including  mail  and  express 

(3)  all  other 

For  the  Class  I  railways  of  the  United  States  and  Canada,  group  1  (freight)  repre- 
sents approximately  82  percent,  group  2  (passenger)  14  percent  and  group  3  (all  other) 
4  percent.  If,  therefore,  the  study  is  confined  to  the  effect  of  variations  in  freight  and 
passenger  revenues  any  error  due  to  neglect  of  other  revenue  will  be  negligible. 

The  relationship  between  freight  and  passenger  revenue  shows  considerable  variation 
on  different  railways  and  as  this  relationship  has  considerable  effect  on  operating  expenses, 
it  must  be  determined  for  the  particular  property  under  consideration. 

Having  divided  the  gross  revenue  as  indicated  above,  the  next  step  is  to  relate 
revenue  to  the  transportation  units  which  cause  expense.  These  units  are: 

For  freight  service 

(1)  Net  ton-miles 

(2)  Gross  ton-miles 

(3)  Freight  train-miles 

(4)  Freight  train  car-miles 

For  passenger  service 

(1)  Passenger  train-miles 

(2)  Passenger  train  car-miles 

Table  1,  with  notes,  affords  a  convenient  method  of  relating  revenue  and  transpor- 
tation units. 

Having  determined  the  transportation  units  for  the  selected  test  period  and  estimate 
period,  it  is  necessary  to  relate  the  primary  accounts  of  the  transportation  group  of 
expenses  to  the  units  so  determined.  Certain  of  these  primary  accounts  combine  both 
freight  and  passenger  expense,  and  the  expense  due  to  each  must  be  separated. 

For  convenience,  the  primary  accounts  may  be  grouped  as  shown  in  the  accom- 
panying table. 

Grouping  of  Primary  Accounts 

Approximate  percentage 
of  total  transporta- 
Group        Designation  tion  expense  Accounts  included 

1  Supervision 4.6  371,     372 

2  Station  service 18.7  373,     376 

3  Yardaervice 17.6  377,     378,     380,     381, 

382,     383,     384,     385, 
386,      387,      388,     389 

4  Train  and  locomotive  operation 52.6  392,     393,     394,     395, 

396,  397,  398,  399, 

400,  401,  402 

5  Si^al  and  crossing  protection 1.5  379,  404,  405,  406 

6  Casualties-- -.- 1.8  415,  416,  417,  418, 

419,     420 

7  Miscellaneous  operations 2.7  374,     375,     403,     407, 

408 ,     409 

8  General  expense 0.4  410,     414 

9  Joint  facilities,  debit  and  credit 0.1  390,     391,     412,     413 

100.0 

The  percentage  which  each  group  bears  to  the  total  will  vary  with  conditions  on 
individual  roads,  and  must  be  determined  for  that  road.  The  percentages  shown  are  onlv 
used  to  show  generally  the  relative  importance  of  each  group. 


52  E  c  o  n  omics    of    Railway   Location    and   Operation 

Table  1 

Selected  Test  Period  and  Estimated  Earnings  and  Operating  Units 

Selected 
Test  Period  Estimate 

Freight  revenue 
Passenger  revenue 
Other  revenue 
Total  revenue 

Net  ton-miles 
Gross  ton-miles 
Freight  train-miles 
Freight  train  car-miles 

Passenger  train-miles 
Passenger  train  car-miles 

Notes:  1.  In  estimating  net  ton-miles  based  on  freight  revenue  allowance  must  be  made 
for  any  probable  change  in  freight  rates,  or  nature  of  tonnage  to  be  handled. 

2.  In  estimating  gross  ton-miles  based  upon  net  ton-miles  allowance  must  be 
made  for  any  change  in  nature  of  tonnage  handled  which  might  affect  average 
car  loading  or  relationship  between  empty  and  loaded  car  movement. 

3.  In  estimating  freight  train-miles  based  upon  gross  ton-miles,  allowance  must 
be  made  for  reserve  capacity  of  trains  already  operating  and  for  any  possible 
increase  in  locomotive  capacity.  Fixed  or  scheduled  freight  train  service  which 
must  be  operated  to  meet  service  requirements  will  often  be  found  to  have  a 
reserve  capacity  and  minor  increases  in  traffic  can  be  handled  without  increase 
in  mileage. 

4.  In  estimating  freight  train  car-miles  based  on  net  ton-miles  allowance  must 
be  made  for  any  probable  change  in  nature  of  tonnage  handled  which  would 
result  in  a  change  in  average  car  loading  or  in  the  relationship  between  empty 
and  loaded  car  movement. 

5.  Passenger  train-miles  are  dependent  on  policy  as  well  as  volume  of  traffic. 
In  estimating  passenger  train-miles  the  policy  of  the  company  in  respect  to 
increasing  or  decreasing  passenger  service  must  be  given  consideration.  In  gen- 
eral, passenger  train  mileage  will  not  vary  with  minor  fluctuations  in  passenger 
earnings.  Consideration  must  be  given  also  to  any  probable  change  in  passenger 
rates. 

6.  Passenger  train  car-miles  may  be  assumed  to  vary  with  the  passenger  traffic 
but  the  extent  depends  upon  the  amount  of  change  in  traffic  expected,  and  the 
reserve  capacity  of  the  cars  already  operating.  Coach  car-miles  may  be  assumed 
to  vary  directly;  luxury  cars,  i.e.  parlor  and  sleepers,  to  a  much  smaller  extent. 

The  following  indicates  for  each  group  the  method  to  be  followed  in  determining 
their  probable  variation  with  traffic  volume.  Necessary  correction  must  be  made  for 
changes  in  wages  and  material  prices. 

Group  1.  Supervision.  This  group  includes  Accounts  371,  Superintendence,  and  372, 
Despatching  Trains.  These  accounts  are  not  affected  by  changes  in  relationship 
between  passenger  and  freight  traffic,  and  only  to  a  slight  degree  by  changes 
in  volume.  It  may  be  assumed  that  these  expenses  will  vary  10  percent  of  the 
variation  in  traffic  volume  as  expressed  in  gross  revenue. 

Group  2.  Station  Service.  This  group  includes  Accounts  373,.  Station  Employees,  and 
Account  376,  Station  Supplies  and  Expenses.  Those  portions  of  Accounts  373 
and  376  due  to  the  expense  of  operating  large  freight  offices  and  sheds,  vary 
almost  directly  with  the  volume  of  freight  traffic  while  that  portion  due  to 
expense  of  operating  stations  with  less  than  a  total  staff  of  four  men,  and 
passenger  stations,  will  show  very  little  variation  with  ordinary  changes  in 
traffic.  For  these  reasons  it  is  necessary  to  divide  the  expense  as  between  vari- 
able expense,  which  is  the  expense  incurred  at  larger  freight  stations,  and  fixed 


Economics    of    Railway    Location    and    Operation 


S3 


«      w 


S  at 


looooooooooom 


r*  IOOOOOOOOOOOU3 
[£°  04  CO  <o  ;o  ;o  <o  U3  «o  <c  ;o  Tr  eg 


cC5 


co^ 


ea  o 


S  ' 

TJT) 


,^   i-    O   w   u   w 


C    o   CD 

3  cii  rt  a 


O   O   'i  t;  c3  ?,  T) 


-  X  t« 


:.S  5  o  oi 


m  M  i._o  "  g  m 
T2  13  ^  *^   Q>  -^  *a 

ta  01^  3:5  c  tu 


o< 

E     . —  _  . 

.5  7*  c-t-ooooc»c»oowoooooooo 
V.  H  m  CO  «  CO  CO  eo  ec  CO  CO  CO  c<5  CO 


TO   3  cS 

2;ss 


sis 


o  — • 


J= 

E-i 

CS 

21 

0 

•J^J3 

=  ^ 

CJ 

di 

?>? 

c 

.  <u 

0 

^  23 

'  j:     .s      b 


^  ^'2  2 

"Sib    S 

oT--  m  S, 


o  ==  = 


!3  8°| 

O  S:  ^  -*^ 

S    C    01   >- 

c       rt  a) 
+J  CO  o  +->  P 


S  a).S 

0 

0    05   0 

"S-c 

S   3   !« 

cl 

7.  Th 
th  vol 
tiere  v 
tching 

C 
.2 

S'g  ^'g 

a) 
P 

386, 

tion 
yard 
ger  s 

-a  t^  a 

0 

in-r  a)  0) 

00  3=:  s 

84,3 
eir  V 
sma 
n  pas 

ja 

V 

d 
0) 

coj-  =  — 

rt 

co-.*':^'? 

>! 

aj 

CO  "  M  S"  S,  3      « 

ooajor,  — ■""o 
co"S"c"'C2      ■ 

00(DCO>>«*2        - 

.  0)  o  °  ti  c  g 

M    &    P    g    0)    o    •>, 

2tn33a)0roc    • 
o.ti  o  ■— 


-uS^S-ds 


•<(«■< 


54 


Economics 


of    Railway   Location    and   OperaU^n . 


2„° 


■u'SSSJE-iE-iEhE-'EhHE-'E-'HEhEh 

u,         oooo 


5  HE-iHHHHHE-'E-iE-'E-" 


<■ 


lis 


T3  a)  -Ji  oj  iJ  X 
<p  m  g  li  01  S 
o  c3  o  ci3  C~, 

•"    ^    r*    W '^^  fliTl 

O    O   5         *^v-   g   5) 

a*^   N  M  ■"!  •*  "5  U3  t- 00  gj  O  N 


^  C  m  c  S 

.5  -S  g  *^  o 

2  t-  i  ►■  d 

■^  M  q  bo  .,  • 
■!->  C  +•  c  ?J  t- 

■S.  I*  «  S  e  .2 

bfi  tn  m  to  T,  .w 

•  rT  m  o  tn  Q)  ii 

j;  (J!  £  0!  fe.2 

.^  .T*  •[-•  -^  _   DD 

^  ^  S  ^5:S 

o  o  o  u  rt  fl 
0)  a>  a)  oj  cj-a 
1^  b  ^  ^^  C  c4 

■O'O'O'O  rt  -t» 
C3  cij  cd  rt  OJ  -u 

B2 " "5  " 

tJ  c  c  c^  fe 

3  3  2  3^  a 

O  O   O   O  u, 

(S  ta  «  c«  rt 

0)  Q)  Cy  0)  C  03 
S   S    S   S    X   fl 

jj  *J  JJ  ■!->    «  2 

rt  rt  rt  rt  5 

j3j3ja.rt  E  a) 

-cna-OTJ  S  >, 
a*  S  9i  2  c  c3 

asssga 

CO  tn  t/l  ra  ^  0 

pj  03  rt  tfl  -^  p 

a,  0)  0)  a)  .,  O 

^^^^  g  g 

c4  cq  ra  »  n  tn 

asga^jis 

t-  t-  C 

OJ  QJ  o 

03  S  2  a)  «       S 
ajfediPuflK      !> 


:!n 


<^   -  .  ^ 

«goo^ 
CcOmM 

+5  fl    a 

rt  o       o 
-t->  u       u 

O  "   £.  "^ 


Economics    of    Railway    Location    and    Operation  55 

expense  which  is  the  expense  at  small  stations  and  passenger  stations.  Variable 
expense  varies  directly  with  volume  as  measured  in  tons  of  l.c.l.  freight 
handled,  or  if  this  figure  not  obtainable,  net  ton  miles  may  be  used.  It  may 
be  assumed  that  the  group  will  vary  50  percent  of  the  variation  in  traffic 
volume  as  measured  either  in  tons  of  l.c.l.  freight  handled  or  net  ton  miles. 

Group  3.  Yard  Service.  This  group  includes  those  expenses  due  to  yard  switching  serv- 
ices. The  expenses  included  in  the  group  are  dependent  upon  the  relationship 
as  between  passenger  and  freight  service  as  well  as  upon  volume  of  each.  For 
convenience  Table  2  has  been  set  up  and  probable  variation  of  each  item  with 
traffic  volume  indicated. 

Group  4.  Train  and  Locomotive  Operation.  This  group  includes  those  expenses  due  to 
train  and  locomotive  operation  both  passenger  and  freight.  They  are  dependent 
upon  the  relationship  between  passenger  and  freight  services  as  well  as  upon 
the  volume  of  each.  For  convenience  Table  3  has  been  set  up  and  the  probable 
variations  of  each  item  with  trafiic  volume  indicated. 

Group  5.  Signal  and  Crossing  Protection.  This  group  of  accounts  includes  expense  due 
to  switch  and  signal  tenders,  signal  and  interlocker  operation,  crossing  protec- 
tion and  drawbridge  operation.  The  effect  of  volume  of  traffic  on  these  items 
is  slight.  It  may  be  taken  as  10  percent  of  the  variation  in  train  mileage. 

Group  6.  Casualties.  This  group  includes  such  items  as  clearing  wrecks,  damage  to  prop- 
erty, etc.  No  material  error  will  result  if  they  are  assumed  to  vary  70  percent 
of  the  variation  in  traffic  volume  as  expressed  in  gross  revenue. 

Group  7.  Miscellaneous  Operations.  This  group  includes  special  expenses  and  their  extent 
varies  on  each  road.  The  extent  of  variation  of  each  primary  account  in  the 
group  must  be  determined  in  accordance  with  the  peculiar  conditions  pertaining 
on  the  individual  property  under  consideration. 

Group  8.  General  Expense.  This  group  includes  stationery  and  printing,  other  expenses 
and  insurance.  No  material  error  will  result  in  assuming  that  these  expenses 
vary  10  percent  of  variations  in  gross  revenue. 

Group  9.  Joint  Facilities.  The  extent  that  this  group  of  expenses  will  vary  with  traffic 
is  dependent  upon  the  agreements  as  to  joint  facilities  that  are  in  effect  on  the 
property  for  which  estimate  is  being  made. 

Table  4 

The  percentages  used  in  the  following  table  are  given  to  illustrate  the  method.  They 
must  be  determined  for  each  particular  property  as  indicated  in  the  report.  When  once 
so  determined  for  the  conditions  pertaining  to  any  property  they  may  be  used  from  time 
to  time  as  long  as  there  are  no  major  changes  in  conditions. 

Percent 
Total 

Expense  Tran'^portation 

Group    Name  Expense 

1  Supervision 4.6 

2  Station  service 18.7 

3  Yard  service 17.6 

4  Train  and  locomotive  operation 52.6 

5  Signal  and  crossing  protection 1.5 

6  Casualties 1.8 

7  Miscellaneous  operations 2.7 

8  General  expenses 0.4 

9  Joint  facilities,  debit  and  credit 0.1 

100.0  64.43 

Summary 

Having  determined  in  the  manner  indicated  above  the  extent  of  variations  in  each 
group  for  the  particular  property  under  consideration,  a  summary  may  be  made  as 
shown  in  Table  4  and  the  figures  thus  obtained  may  be  used  to  estimate  future  trans- 
portation expenses  for  any  given  variation  in  traffic. 

This  report  is  submitted  as  information  with  the  recommendation  that  the  subject 
be  continued. 


Percent 

f"  Percent 

/arialion 

Variable 

with 

of  Total 

Traffic 

Trans pn.  Exp. 

10 

0.46 

50 

9.35 

58 

10.21 

80 

42.08 

10 

0.15 

70 

1.06 

40 

1.08 

10 

0.04 

56 


Economics   of    Railway   Location    and   Operation 


Report  on  Assignment  6 
Effect  of  High  Speed  on  Railway  Operating  Expenses 

M.  F.  Mannion  (chairman,  subcommittee),  V.  T.  Boughton,  C.  W.  Breed,  J.  H.  Dyer, 
A.  W.  Laird,  J.  W.  Porter,  J.  F.  Pringle,  H.  F.  Schryver,  B.  J.  Schwendt,  H.  W. 
Snyder. 

Increases  in  speed  require  increased  fuel  and  water  consumption  for  steam  locomo- 
tives. This  increased  fuel  and  water  consumption  is  greater  for  a  ten-mile  increase  in 
speed  from  40  to  SO  miles  per  hour  than  for  an  increase  from  30  to  40  miles  per  hour. 
Also  the  increased  fuel  and  water  consumption  is  greater  for  an  increase  in  speed  from 
SO  to  60  miles  per  hour  than  for  an  increase  from  40  to  50  miles  per  hour.  In  other 
words,  the  higher  the  speed,  the  larger  the  increase  in  fuel  and  water  consumption. 

Increases  in  speed  also  have  a  very  material  effect  on  power  requirements.  The  power 
requirements  for  handling  a  given  volume  of  traffic  increase  very  rapidly  as  the  maximum 
speed  of  the  service  is  increased.  This  increase  in  power  requirements  necessitates  addi- 
tional capital  expenditures  and  increases  maintenance  of  equipment  expenses  in  proportion 
to  the  increase  in  power  requirements. 

In  order  to  show  the  effect  of  high  speed  on  fuel  and  water  consumption  and  power 
requirements.  Tables  1  and  2  have  been  compiled  for  three  different  types  of  service, 
passenger  train,  coal  and  ore  trains  and  manifest  freight  trains,  based  on  data  contained 
in  Chapter  16  of  the  Manual.  These  tables  are  a  composite  summary  for  six  different 
groups  of  locomotives  based  on  37. S,  35.0,  32.5,  30.0,  27.5,  and  25.0  horsepower  per  ton 
on  drivers  and  give  the  average  weight  of  train  for  any  maximum  speed  and  the  average 

TABLE  NO.    1 

COMPOSITE  StJMMAKY 
PASSEBCTK  OR  COAL  AND  ORE  TKAINS 

AVERAGE  SPEED 
OeUJSIVE  OK  TIME  STOPPED 


BETWEEN  STOPS 
40  ^0 


43.76 
34.53 
27.85 
24.94 
22.41 
20.20 
18.15 
16.42 
15.11 
14.34 


71. 

54. 

42. 

33.72 

27.27 

24.43 

22.03 

19.82 

17.84 

lb. 15 

14.88 

14.09 


17.64 
15.97 
14.71 
13.93 


10b. b2 
69.06 
52.56 
41. 
32.55 
26.40 
23.66 
21.38 
19.2' 
17.3^ 
15.74 
14.51 
13.72 


105. Ifa 

68.10 
51.85 
40.54 
32.12 
26.09 
23.42 
21.16 
19.06 
17.22 
15.61 

H.39 
13.60 


W  -  Weight  of  LocomotlTe  (EnglDe  &  Tender)  in  ^ns 


Economics   of    Railway    Location    and    Operation  57 


COMPOSITE 

StMIAET 

MANIFEST  FEEICaT  TRAINS 

ATERAGE 

aPKKD 

EXCHJSIVE  OF 

TIME  STOPPED 

wa 

WEIGHT  OF  TRAIN 

MILES 

WTklEBl  STOPS 

SPEED 

(TRAILING  \ffiIGHT) 

20 

2'i 

30 

40 

50 

60 

80 

10c 

) 

^ 

3.7HW 

55-90 

58.25 

59.88 

b2.1« 

63.60 

64.59 
55.5b 

b5.B9 

66.67 

p. 54" 

6.75  " 

48.41 

50.37 

51.70 

53.60 

54,7§ 

56.61 

57. 

,26 

55 

44.52 

46.30 

47.56 

49.24 

50.28 

51.04 

51.98 

52. 

■P 

50 

8.25- 

40.58 

42.25 

43.37 

44.&5 

45.80 

46.44 
41.82 

47.29 
42.58 

47. 

,81 

45 

10.24  " 

36.64 

38.op 

39.05 

40.39 
36.06 

41.24 

^}- 

,04 

40 

12.87  " 
16.16  - 

32.83 

34.06 

34.93 

1:1? 

37.29 

37.94 

38. 

.33 

35 

28.70 

29.78 

30.54 

3ii54 

32.61 

33.19 

33. 

.53 

H.P.  HOUES  PER 

1000  GROSS  TOl! 

'-MII£S' 

(TRAILING) 

^ 

3.78  W 

50. bg 

49.10 
38.77 
34.58 

4H.02^ 

46.6^ 

37.06 

45. Hb 

4^.32 
36.06 

35.56 

ITTiT 

5-54  - 
b.75  - 

40.05 

i:§5 

36.46 

35. 

2 

55 

35-^2 

33.02 

32.50 

32.16 

31.72 

3i' 

50 

8.25- 

31.88 

31.07 

30.35 

e9.6i 

2b!o& 

28.88 

28.50 

28. 

.29 

45 

;^°-f4  " 

28.40 

27.63 

27.11 

26.47 
23.78 

25.82 

25.49 

25. 

,31 

40 

'12.8?  - 
i&.iS  • 

25.40 

24.75 

24.31 

23.46 

23.24 

22.37 

22, 

.81 

35 

23.03 

22.45 

22.07 

21.58 

21.30 

21.09 

20.87 

20, 

.72 

W  -  Wei 

ght  of 

LocomotiTe    (En 

glne  «t 

Tender) 

In  Tons 

speed,  exclusive  of  time  stopped,  for  various  distances  between  stops;  also  the  horsepower- 
hours  per  1,000  gross  ton-miles  trailing  weight. 

Suppose  we  wish  to  determine  what  the  effect  would  be  on  coal  and  water  con- 
sumption and  power  requirements  if  we  increased  the  maximum  speed  of  certain  coal 
trains  from  45  miles  per  hour  to  60  miles  per  hour,  the  locomotives  used  in  this  service 
being  a  2-10-2  type,  weight  on  drivers  175  tons,  weight  of  locomotives  240  tons  and 
weight  of  locomotive  (engine  and  tender)  420  tons.  From  Table  1  we  find  that  at  the 
maximum  speed  of  45  miles  per  hour,  a  trailing  weight  can  be  hauled  equal  to  13.74 
times  the  weight  of  the  locomotive,  or  13.74  times  420  tons  or  5,771  tons.  At  the  maxi- 
mum speed  of  60  miles  per  hour  a  trailing  weight  of  only  7.56  times  420  tons  or  3,175 
tons  can  be  hauled.  From  this  it  can  be  seen  that  in  order  to  haul  any  given  volume  of 
coal  per  month,  say  100,000  tons,  at  a  maximum  speed  of  60  miles  per  hour  instead  of 
45  miles  per  hour,  would  require  an  increase  of  over  80  percent  in  the  number  of  loco- 
motives and  trains.  This  increase  in  the  number  of  trains  would  also  result  in  the  same 
percentage  increase  in  delays,  as  delays  per  train  vary  directly  with  the  number  of  trains. 
Wages  of  train  and  engine  crews  would  also  be  increased  as  well  as  equipment  repairs. 

From  Table  1  we  can  also  obtain  the  number  of  horsepower-hours  required  per 
1,000  gross  ton-miles.  For  a  maximum  speed  of  45  miles  per  hour  and  a  distance  between 
stops  of  25  miles,  the  horsepower-hours  per  1,000  gross  ton-miles  are  21.31.  For  a  maxi- 
mum speed  of  60  miles  per  hour  and  a  distance  between  stops  of  25  miles  the  horsepower- 
hours  per  1,000  gross  ton-miles  are  29.62.  So  it  is  evident  that  in  order  to  handle  any 
given  number  of  gross  ton-miles  at  this  increased  maximum  speed  will  require  an  increase 
in  coal  and  water  consumption  of  approximately  40  percent. 

A  prehminary  study  of  the  effect  of  any  other  increase  in  maximum  speed  on  power 
requirements  and  fuel  and  water  consumption  can  be  obtained  in  the  same  manner  as 
above. 

The  following  exhibit  is  a  more  detailed  discussion  of  the  factors  involved  and  con- 
ditions to  be  considered  if  a  detailed  study  of  the  effects  of  proposed  increased  speeds 
is  desired. 


58 Economics    of    Railway    Location    and    Operation 

Exhibit  A 

In  studying  the  cost  of  operating  high  speed  trains  it  is  important  to  begin  with  an 
analysis  of  some  of  the  fundamental  factors  which  determine  the  feasibility  of  the  service 
and  which  also  have  an  effect  on  the  cost. 

The  tables  in  the  body  of  the  report  establish  the  relation  which  exists  between 
certain  of  those  factors;  for  example,  the  relation  between  the  weight  of  the  train  and 
the  weight  of  the  locomotive  to  obtain  any  desired  speed  on  various  grades  for  three 
classes  of  trains,  namely  passenger  trains,  coal  and  ore  trains  and  manifest  freight  trains. 

The  tables  also  show  the  relation  between  the  maximum  and  average  speed  for 
trains  on  level  tangent  track  making  frequent  stops,  and  the  horsepower-hours  required 
to  obtain  these  average  speeds.  The  average  speeds  do  not  include  any  allowance  for  the 
duration  of  stops  because  this  time  is  a  variable  which  must  be  allowed  for  separately. 

The  horsepower-hours  are  based  on  the  boiler  output  (excluding  power  for  aux- 
iliaries) and  therefore  are  proportional  to  the  fuel  and  water  required  to  perform  the 
desired  service.  Thus  in  the  early  stages  the  feasibility  of  performing  any  service  and 
the  magnitude  of  some  of  the  items  involved  can  be  partially  determined  from  these 
tables. 

In  developing  the  tables  for  steam  locomotives  it  has  been  necessary  to  take  account 
of  some  of  the  factors  connected  with  the  design  and  also  some  of  those  which  have  to 
do  with  operation.  The  purpose  of  this  exhibit  is  to  present  some  explanatory  notes 
regarding  those  details  for  reference  in  case  they  are  desired. 

I.  Design 

(a)  Tracking  qualities  of  locomotives 

(b)  Weights  of  locomotives 

(c)  Horsepower  capacities 

(d)  Types  of  trains 

(e)  Train  resistance 

II.  Operation 

(a)  Grades  and  curves 

(b)  Weights  of  trains 

(c)  Frequency  of  stops 

(d)  Slow  downs 

(e)  Power  consumption 

I.  Design 

(a)  Tracking  qualities. — The  tracking  qualities  of  a  locomotive  depend  upon  the 
mechanical  design  and  construction  and  are  more  or  less  reflected  by  the  wheel  arrange- 
ment. 

(b)  Weights  of  locomotives. — The  weights  of  locomotives  depend  upon  the  wheel 
arrangement  and  the  permissible  weight  per  axle  which  in  turn  is  fixed  by  or  determines 
the  type  of  roadbed  and  track  construction  that  is  suitable  for  their  operation. 

(c)  Horsepower  capacity. — Theoretically  the  horsepower  capacity  of  a  locomotive 
depends  upon  its  physical  dimensions  and  allowable  weight  subject  to  design  experience 
and  skill. 

For  the  purpose  of  this  discussion  it  is  assumed  that  the  weight,  tracking  qualities 
and  horsepower  capacities  of  typical  steam  locomotives  are  as  set  forth  in  Table  1601 
on  page  16-15  of  the  Manual. 

Tables  3  to  13  are  divided  into  six  groups  based  on  37.5,  35.0,  32.5,  30.0,  27.5  and 
25.0  horsepower  per  ton  on  drivers.  These  horsepowers  are  typical  of  one  or  more  types 


Economics    of    Railway    Location    and    Operation 


59 


TABLE  NO.  3 

PASSENGER  OR  COAL  AND  ORE  ISMSS 
CRODP  I  (37,5  HP  PER  TON  ON  DRTVERS) 


Typical  locomotives  4-4-2 

Weigit  on  Drivers  70  Tons 

Weight  of  Engine  I43  " 

Weight  of  LoeomotlTe  (Engine  &  Tender)    253  " 


Ratio  of 

Weights 

1.00 

2.04 

J.62 


AVERACE  SPEED 
EXCLDSIVE  OF  TIME  STOPPED 


MAI 

110 
100 


WEIGET  OP  TRAIN 

(TRAimro  wExom)    20 
•95  w  7SI 


1.51 

2.25 
3.29 


2*) 

T3T30" 


40 


72.60  76.4D  79 
66.15  69.60  72.20 
59.50  62.50  64.70 


MILES  BETWEEN  STOPS 
30     40     50     60     80    100 

.70    21.40    24-55    2'''*    95*^  101.75 


.40  88.40  91 .00  92.70 
.85  78.40  80.10  82.40  83.80 
.05    70.15    71.60    73.50    74.80 


HP  HRS.   PER  1000  GROSS  TON  MILES   (TRAILING) 

127.26  122.10  iia.as  11^.85  110.96  109.04  106.62  105.16 
88.00  84.AO  81.92  78.73  76.70  75.30  73.70  72.70 
65.21  62.64.  60.82  58.40  56.96  55.97  54.77  54.05 
50.00   48.06   46,63   44.81   43.72   42.99   42.09    41.54 


110 

.95  w 

100 

1.51- 

^ 

(2.25  " 

3.29  " 

11  -  Weight  of  LoeomotlTe   (Engine  &  Tender)   in  Ions. 


TABLE  NO.  4 


PASSENGER  OR  COAL  AND  ORE  TRAINS 
ORODP  II  (35.0  HP  PER  TON  ON  DRIVERS) 


IVplcal  LocomotlTes 

Weight  on  Drivers 

Weight  of  Engine 

Weight  of  Locomotive  (Engine  4  Tender) 


4-4-2 

70  Tons 
128     " 
ider)     224     " 

4-6-4 
105  Tons 
192     " 

337    " 

AVERACE  SPEED 

Ratio  of 

Weights 

1.00 

1.82 

3-21 


EXCIDSIVE  OF  TIME  STOPTBD 


MAX 

WEiarr  of  train 

SPEED 

(TRAIUNO  WEIGHT)      20 

100 

1-73  w  7i.b5 
2.56  "  65.60 
3.61  «                 59 .iO 

5.10  ••              52.60 

^ 

7.40 "           45.33 

^5 

9.00  "  41.56 
10.90  "           37.83 

50 

45 

13.40  "           33.92 

laiES  HETlffiEN  STOPS 


':n 


HP  HRS.  PER  1000  CROSS  TON  MILES  (TRAILING) 

79.5?     76.99     73.71     70.64     68.73     67.45 


50.99 
40.42 
32.39 
26.10 
23.32 
21.15 
I9.I6 


"^4:90 
50.28 
39.86 
31.96 
25.79 
23.08 

20.95 
18.94 


LOO 

3.61 

11 

5.10 

7.40 

55 

9.00 

50 

10.90 

45 

13.40 

.16 

48.10 

38.15 
30.69 

27.39 
24.76 

22.36 


58.63 

46.15 

36.78 

29.49 
26.75 

23.82 

21.53 


51 

44.«2 
35.80 
28.52 
25,40 
23.18 
20.95 


54.54 
43.15 
34.50 
27.63 
24.72 
22.39 
20.23 


53.12 
42.03 
33.65 
27.01 
24.17 
21.91 
19.80 


52.17 
41.31 
33.04 
26,61 
23.81 
21.59 
i9.52 


Yf  -  Weight  of  locomotive  (Engine  k   Tender)  in  Tons, 


60 


Economics   of   Railway   Location    and   Operation 


TABLE  KO.3 


PASSENGER  OR  COAL  AND  ORE  -TRAINS 
GROUP  III    (32.5  HP  PER  TON  ON  DRITERS) 


Typical  Locomotives  4-6-2  2-8-4  4-8-4 

Weight  on  Drivers  105  Tons  I40  Tons  I4D  Tans 

Weight  of  Engine  173     "  230     "  230     " 

Weight  of  Locomotive  (Engine  &  Tender)     302     "  404     "  404     " 


Ratio  of 

Weights 

1.00 

1.65 

2.88 


AVERAGE  SPEED 
EZCLDSIVE  OF  TIME  STOPPED 


WEIGHT  OF  TRAIN 
(TRAILING  WEKarr)     20 


2a 


7^50" 

69.90 

63.00 

55.55 

47.9') 


MIES  BEIV/EEN  STOPS 
30  40  "iO 60 


Ho. 00 
72.30 
65.30 


76.10 

68.20 
60.20 
51.90 
47.65 
43.50 
39.07 


^ 


100 


1.79  w 

2.59  - 
3.70 " 

5.26  " 

7.61- 

9.22  " 

11,13  " 
13.80  •• 


72. bo 
66.40 
60.10 
53.00 
45.85 
42.05 
38.46 
34.55 


44.05 

40.35 
36.22 


49. 
45.65 
41.70 
37.45 


50 
78.50 
^  30 


80.20 
70 


70.30     71.70     73.65     7. 

61.95    03.15    64.75    6| 


40.13 


b3 

54 

49.85 

45.48 

40.90 


12.40 
3.65 

55.65 
51.05 
46.55 
41.85 


74.85 

56.A6 
51. §0 
47.18 
42.42 


HP  HRS.  PER  1000  CROSS  TON  IglJS    (TRAILING) 
80T9O 


LOO 

1.79  w 

^ 

2.59  - 

3.70  - 

S 

5.26- 
7.61  - 

55 

9.22  •• 

50 

11.13  " 

45 

13.80  " 

77,24 

61.^4  55,30 

48,07  46,28 

38.36  36.97 

30.57  25.49 

27.46  26.44 

24.76  23.86   23.i( 

22.15  21.37   20.83 


75.30 
57.71 
44.94 
35-27 
28.89 

25.74 


72.22 

55.38 


43- 

34. 

27. 

24.87 

22.51 

20. 16 


70.41 
54.00 
42.30 
33.83 
27.11 
24.35 
22.07 
19.76 


53.0S 
41.61 
33.30 
26.70 
24.00 
21.77 
19.50 


bb.70 
51.23 
40.21 
32.25 
25.91 
23.30 
21.17 
18.96 


W  -  Weight  of  Locomotive  (Engine  *  Tender)  in  Tons. 


TABLE  NO.  6 


PASSENGER  OR  COAL  AND  ORE  TRAINS 
GROUP  IV   (30  HP  PER  TON  ON  DRIVERS) 


TTjioal  Locomotives  4-8-2 

Weight  on  Drivers  140  Tons 

Weight  of  Engine  210     " 

Weight  of  Locomotive  (Engine  k  Tender)     364     " 

AVERAGE  SPEED 


2-8-4 
140  Tons 
210     " 
364    - 


EXCLUSIVE  OF  TDffl  STOPPED 


2-10-4 
175  Tons 
262     " 

455    " 


WEIGHT  OF  TRAIN 
(TRAILING  WEIGHT)      20 


7.77  " 
9.40  " 
11.50  " 
14.00  " 
17.40  " 
21.70  " 
27.30  " 
34.30  " 


46.18 
42.52 
38.71 
35.1^ 


-25 


MII£S  BETWEEN  STOPS 
30  40  50  60 


31.25 

27.35 

3.25 

5.79 


44.50 
40.60 

36.75 
32.70 
28.60 
24.35 
19.75 


57:80 
49.90 
46.00 
41.92 
37.92 
33.70 
29.50 
25.13 
20.47 


bo. 50 

52.13 
48.00 
43.70 
39.45 
35.11 
30.72 
26.20 

21.44 


b2.10  b3.35 

53.53  54.50 

49.20  50.05 

44.82  45,63 

40,45  41,15 


80 


35.9t 

26,87 
22,08 


36,60 
32,02 
27.35 
22,52 


-^ 
55.K) 
51,20 
46,65 
42,05 
37.40 
32-73 
27.97 
23,10 


Ratio  of 

Weights 

1.00 

1.50 

2.60 


100 


56.60 
51.90 
47.30 
42.62 
37.90 
33.15 
28,35 

23.45 


HP.  HBS,   PER  1000  GROSS  TON  HILES    (TRAILING) 


s 

5.3rfw 
7.77  " 

5*) 

9.40  " 

50 

11.50  " 

45 

14.00  " 

40 

17.40  - 

55 

21.70  " 

}0 

27.30  " 

25 

34.30  - 

3tl.ll    3b. 7, 

30.44 
27.26 
24.44 
22.10 
15.87 
18,07 
16,72 
16.30 


29.38 
26,29 
23.53 
21.07 


28.60 


34.45 

28.60  27.64 

25,63  24.80     24,31 

22.52  22.25     21.   " 

20.81  20.18 

19.22     18.78  18.23 

17,49     17.10  16.62 

16.19     15.83  15.39 

15.73,,  15.35  14.87 


33.b?    33.1b 

27.06     26. 


19.81 
.90 
lb.32 
15.13 
14.59 


.68 
23.98 
21.51 
19.56 


7.90    17.69    17.41 
6.32    16.13    15.89 


14.95 
14.40 


32.  bl 

26.20 

23.56 

21.15 

19.25 

17. 

15.89 

H.73 

14.16 


32.14 
25.91 
23.31 
20,93 
19,06 
17.25 
15.74 
14,60 
14.02 


W  -  Weight  of  Locomotive  (Engine  k  Tender)  in  Tons. 


Economics   of    Railway    Location    and    Operation 


61 


TABI£  KO.  7 

PASSEKCER  OR  COAL  JUTO  ORE  TRAINS 
CROUP  V  (27.5  HP  PER  TON  OK  DRIVERS) 


Eat.'^o  of 

typical  LoeomotlTea 

2-8-2 

2-10-2 

Wei6,^t3 

Weight  on  Drlvera 

140  Tons 

175  Tons 

1.00 

Weight  of  Engine 

192  - 

240  " 

1.37 

Weight  of  Locomotive  (Engine  ft,  Tender) 

336  " 

420  " 

2.40 

AVERAGE  SPEED 
KXDLDSIVB  OF  TIME  STOPPED 


MAX 

-lo- 
ss 
50 
45 
40 
35 
30 
25 


WEIOT  OF  TRAIN 
(TRAILING  WEIGgIT) 

7.5a  W  - 

9.19  - 

11.20  " 

13.80  " 

17,30  - 

a. 70  » 
27.50  - 
35.00  - 


MtUES  HETOEEN  STOPS 
20  2'i  30  40  'jO  &0 

Ab.37    4H.53  I '^0.20    ^2.35    53.70    54-70 


80 


42.93 
39.30 
35^ 
31.68 
27.80 
23.75 
19.35 


44.95    46.30    48.20    49.45 


41,07 
37.15 
33.06 
29.02 
24.78 
20.25 


38!28 
34.05 
29.85 
25.53 
20.93 


44,02 
39.75 
35.35 
31,00 


45,10 
40,70 
36.21 
31.73 
27.15 
22.38 


50, 
45.Bfe 

36!8o 

32.23 
27.60 
22.78 


55.90 
51.40 
46,82 
42,22 

37.55 
32,90 
28,15 
23.28 


100 
IST70 
52.10 
47.42 
42.75 
38.03 
29 


^ 


23,62 


HP  HRS.  PER  1000  CROSS  TON  MILES  (TRAILING) 


28.09 
25.11 
22,60 
20.25 
18,14 
16,45 
15.08 
4.28 


2b.b5 
23.88 
21.56 

19. 3& 
17.3b 
15.78 

^11 


"2^ 
23.63 
21.35 
19.19 
17.21 
15.64 
14.35 
13.5b 


"Go" 

55 
50 

45 
40 

35 
30 

25 


7.58  w 
9.19  " 

11.20  " 
13.80  " 
17.30  " 
21.70  " 
27.50  " 
35.00  " 


30:9b 
27,52 
24.70 
22.03 
19.69 
17.80 
j,b.29 

^^5-49 


i: 


23,85 
21,32 
19.07 
17.26 
15.80 
15.01 


29.05 
25.93 

23.^0 

20.84 
18.65 
16.88 


27.52 
24.63 

22.19 
19,90 

16.18 
14.87 
H.04 


27.13 
24.29 
21.91 
I9.&6 
17.62 
16.00 


W  -  Welgh^  of  Locomotive  (Engine  ft  Tender)  In  Tons. 


TABLE  NO.  8 


PASSENGER  OR  COAL  AND  ORE  TRAINS 
CROUP  VI    (25.0  HP  PER  TON  ON  DRIVERS) 


typical  Locomotives 

Weight  on  Drivers 

Weight  of  Engine 

Weight  of  locomotive   (Engine  ft  Tender) 


Ratio  of 

-  6  ;«  6  -  4 

4-6/6-4 

Weights 

210  ibas 

210  Tbns 

1.00 

300  '• 

300  " 

1.43 

462  " 

462  " 

2.20 

AVERAGE  SPEED 
EJOCIDSIVE  07  TIME  STOPPED 


UAX 

SPEED 

-Eo" 
55 
50 
45 
40 
35 
30 
25 


WEICST  OF  TRAIN 
(TRAILIKB.WEIGHT) 


7.45 
9,04 
11,10 
13.70 
17,10 
21.70 
27,50 
35.40 


J^ 


MLES  BETOKEN  STOPS 
30  40  50  60 


4fa,9b     49,00  I  50,b0     52,fa5     54,00     ^4,90 
43.35  I  45.50     46.65     48.50     49.65     50,50 

1  41.30  42,55  44,20  45,25  46,00 


80 


5b,  10 

51,60 

46,95 
42,30 
37.65 

3^.01 
28,30 

23.50 


5b.  85 

52.25 
47,50 
42,80 
38,12 

28,65 

23,80 


BP  HRS,  PER  1000  GBOeS  TON  MILES  (TRAILIHC) 


bo 

7.45  w 

55 

9,04  " 

50 

11,10  " 

45 

13,70  " 

40 

17.10  " 

55 

21.70  » 

30 

27.50  " 

25 

35.40  " 

21.9 

19,51 
17.44 
15.95 
14.93 


V  -  Weight  of  Locomotive  (Engine  ft  Tender)  in  Tons. 


62 


Economics    of    Railway    Location    and   Ope  ration 


TABLE  DO.  9 

MANIFEST  FHBICnr  TRADE 
GROUP  II    (35.0  HP  PER  TON  ON  DEITORS) 


Typical  locomotives                 4-4-2 
XelgHt  on  DrlTsrS                    7°  ^°s 
Weight  of  Engine                      128  " 
Welgtt  of  LocomotlTe  (Engine  4.  Tender)   224  " 

4  -'6  -  4 
105  Tbns 
192  " 

337  " 

AVERAGE  SPEED 

Ratio  of 

HelBhts 

1.00 

1.82 

3.21 


■EKIDSIVE  OF  TDCE  STOPPED 


WEICIiT  OF  TRAIN 
(TRAILING  WEIGHT) 


47T85 
43.83 
39.90 
35.77 


Jl. 


57.75 
49.85 
45.70 
41.57 
37.30 


MILES  BETWEEN  STOPS 
30     40     50     60 

59.20    bi.85    63.30    64.35 


51.30 
47.00 

42.77 
38.40 


25 


54.45 
49.90 
45.40 

40.80 


55.30 
50.70 

46.10 

41.45 


65.70 

56.40 
51.75 
47.05 

42.28 


100 

bb.50 

57.10 
52.35 
47.60 

42.80 


HP  HRS.  PER  1000  GROSS  TON  MILES  (TRAILING) 

:Er-^ -^ — '-^^ 


45.86  48.72  47.29  4b.43 

38.78  38.32  37.27  36.64 

34.74  34.00  33.07  32.51 

31.71  30.43  29.63  2S.14 

27.97  27.39  26.66  26.23 


36.23 

28.82 
25-93 


3.60  w 
5.33" 
6.55  - 
8.00  - 
9.90  " 


51.49 

fa 

28.84 


45.15 
35.68 
31.67 
28.42 
25.57 


44.72 
35.38 
31.39 
28.17 

25.35 


Weight  of  LocouDtive  (Engine  &.  Tender)  in  Tons. 


TABIS  NO.   10 

MANIFEST  FREICSn'  TRAINS 
GROUP  III   (32.5  HP  PER  TON  ON  DRIVERS) 


Ratio  Of 

Typical  LoooaotliTBS 

4-6-2 

2-8-4 

4-8-4 

Weights 

Weight  on  Drivers 

105  Tone 

140  Ttons 

140  Tbns 

1.00 

Mei,>;ht  of  Engine 

173  " 

230  " 

230  - 

Weight  of  LocoQOtlve  (Engine  i  Tender) 

302  " 

404  " 

404  - 

AVERAGE  SPEED 
EXCLUSIVE  OF  TBIE  STOPPED 


WEIG!!T  OF  TRAIN 
(TRAILING  aEICTT) 


MILES  BETWEEN  STOPS 
2*1  30  40  50  60  i 

58.40     60.10     62.30     63.70     64.70     6' 


3.82  W 

5.60 

6.80 

8.26 
10. vl 
12.70 

I'i.So 


53.40  54.to  55.40 

49.00  50.10  51.00 

44.70  45.67  46.J3 

40.13  41.02  41.63 

35.70  36.48  37.03 

31.17  31.90  32.35 


95 
56.50 
51.90 
47.20 
42.45 
37.73 
33.00 


66.71 

57.17 
52.46 

47.75 
42.95 
38.17 
33.36 


HP  HKS.   PER  1000  CROSS  TON  MI1£S    (TRAILING) 
cry   -ii     aH   AC    'Zi^r'jr{''''7trYr\     /(C  IP 


50.13  48.45  47.41  46.16  ^ 

39.81    38.51    37.70    36.69    3 


44.80 

35.67 

3i'22 

28.83 
25.67 

23-39 
21.48 


ZEzT 
.60  " 
.80  - 
1.26  - 
.31  " 


35 
31.8b 

28.39 
25.77 
23.65 


34-42 
30.95 
27.57 
25.05 
23.00 


33.71 
30.34 
27.03 
24.5b 

22.57 


32.81 

29.58 

23.98 

22.02 


$: 


32 


32.27 
29.13 

25 -gs 
23.63 
21.70 


44.14 
35.16 
31.44 
28.45 
25.33 
23.09 
21.21 


u 

31.20 
28.22 
25.13 
22.91 
21.05 


W  -  Weight  of  Locomotive   (Engine  k.  Tender)   In  Ttona. 


Economics   of    Railway   Location    and    Operation 


63 


TABLE  RO.  11 


MAMirasT  FREIGHT  TRAINS 
GEODP  IV  (30.0  HP  PER  TON  ON  DRIVERS) 


Ratio  of 

lypical  LoconotlTOB 

4-8- 

2           2 

-8-4 

2-10- 

4 

Weights 

Weight 

on  Drivers 

140  Tona     140 

Tons 

^^1^ 

ns 

1.00 

WelBht 

of  Engine 

210     " 

210 

" 

2.60 

Weight 

of  LocoootiTe 

(Engine  &  Tender) 

364    " 

364 

" 

455    " 

AVERAGE  SPEED 

EXCLDSIVE  OF 

TBffi  STOPPED 

MAX 

JffllGHT  OF  TRAIN 

IQIES 

HETWEN  STOPS 

SPEED 

(TRAILING  WEIGHT) 

20 

25 

30 

40 

50 

60 

80 

100 

S 

3.90  W 

48.35 

1  5a-30 

bO.OO 

b2.20 

b3.bo 

fa4.bo 

feES 

66.68 

5.71  " 

1-95  " 

50.  io 

51-70 

55-55 

54.72 

55.50 

57.25 

v> 

44.50 

46.30 

47.58 

49.25 

50.50 

51.00 

51.95 

52.55 
47.78 

■50 

8.51 " 

40.58 
36.66 

42-15 
38.08 

43.30 

44.80 

45.75 

46.40 
41.80 

47.25 

45 

10.50  " 

39.06 

4D.40 

41.25 

fd 

43.04 
38.27 

40 

13.05  " 
15.30  - 

32. b3 

33.88 

34.76 

35.93 

3b.b9 

37.20 

35 

2ti.53 

29.62 

30,40 

31.42 

32.07 

32.53 

33.10 

33-44 

HP  BBS.   PER  1000  GROSS  TON  MILES    (TRAILING) 


4OT^ 

35.68 

31.88 

28.55 

25.71 

23.21 

21.15 


3.90  W 


60 

5.71 
6.95 

55 

50 

8.51 

45 

10.50 

40 

13.05 

35 

16.30 

50.01 

39.64 
35.32 
31.50 

28.27 
25.44 
23.17 


4p4 
38.46 
34.29 
30.62 
27.54 
24.77 

22.57 


33.60 
30.03 
26.99 
24.33 
22.18 


4ba3 
36.67 
32.74 
29.29 
26.35 


45 

3b 

32.22 

28.85 

25.97 

23.44 

21.39 


44.12 
35.18 
31.45 
28.13 

25.34 
22.93 
20.95 


34.§8 
31.19 
27.96 
25.19 

22.77 

20.80 


W  -  Weight  of  Locomotive  (Engine  &  Tender)  in  Tons. 


TABU!  DO.  12 

M&HIFEST  FREIGET  TRAINS 
(HWnP  V  {27.5  HP  PHJ  TON  ON  DRTVaS) 


Typical  LoooootlTes  Z  ~  %  1-  Z  2-10-2 

Weight  on  Drirers  I4D  Tons      175  Ttons 

Weight  of  Engine  igs  "        240  " 

Weight  of  Locomotive  (Engine  &  Tender)   336  "  42O  " 


Ratio  of 

Weights 

1.00 

1.37 

2.40 


AVERACZ  SPEED 
B3tCLDSIVE  OF  TIME  STOPPED 


MAX     WEIGHT  OF  TRAIN 
SPEED   (TRAILING  WEIGHT) 


3.79  W 

5.57 

6.79 

8.29 

10.29 

12.90 
16.27 


MILES  EEIVIEEN  STOPS 


40 

44.85 

41.07 

37.10 

33.02 

28.95 


50.60 
46.60 
42.65 
38.46 
34.21 
30,00 


30 


bo. 20 
51.70 
47.60 
43.68 
39.41 
35.07 
30.72 


40. 


62; 

53.80 

49.45 

45.10 

40.67 

36.18 

31.67 


.^ 


63,80 
54.90 
50.47 
46.00 

41.47 
36.87 
32.30 


60 


b4.70 
55.70 
51.15 
46.60 
42.05 
37.38 
32.72 


80 


fab. 00 
56.70 
52.10 
47.40 
42.75 
38.00 

33.27 


bb:?? 
57.34 
52.65 

47.91 

45.  iz 
38.38 
33.61 


HP  HRS.  PER  1000  GROSS  TON  MIIJS    (TRAILING) 


3.79  " 

5.57 

b.79 

8.29 
10.29 
12.90 
16.27 


51.12  49,5b  45,49    47.ib    4b.35 

40.17  39,00  38,22    37,24    36.65 

35.70  34.69  34.01 

31.90  31.05  30.48 

28.36  27.63  27.15 


24.69 
22.31 


24.27 
21.94 


33.17 
29.78 
26.55 

23.75 
21.48 


32.67 

m 
23.44 

21.21 


36.26 
32.33 
29.07 
25.95 
23.23 

21.02 


45.15 
35.77 
31-91 
28.71 
25.65 
22.96 

20.79 


44.75 

28/50 
25.46 

22.  81 
20.66 


W  -  Weight  of  locomotive  (Engine  &  Tender)  in  Tona. 


64 


Economics   of    Railway    Location    and   Operation 


mflLE  NO.  13 


MAKIPEST  FREIGHT  TRAINS 
OHOUP  VI  (25.0  HP  KS  TON  ON  DRIVERS) 


Typical  loeomotlTes  2  -  G  /  6  -  4 

Weight  on  Drlrera  210  Tons 

Weight  of  Engine  300  " 

Weight  of  locomotive  (Engine  8:  Tender)     462  " 


MAX 

55 
50 

45 

40 

35 


AVERAGE  SPEED 
EXCUJSIVE  OF  TIME  STOPPED 


WEIGHT  OF  TRAIN 


UIIES  EETOEEN  STOPS 


(TRAIUNG  WEIGBT)      20  2')  30  40 


8.18 
10.22 
12.81 
16.33 


49.15 
45.28 
41.45 
37.43 
33.45 
29.23 


51.00 

46.95 
42.90 

58.73 
34.60 
30.25 


52.30 
48.15 
43.95 
39. b5 
35.40 
30.95 


54.02 
49.68 

40*.88 
36.45 
31.90 


.32- 


-6/6-4 
210  Tons 
300  " 
462  " 


60  80 


55-12 
50.65 
46.17 
41.65 
37.10 
32.45 


55.90 
51.35 
46.77 
42.17 
37.55 
32.85 


56.85 
52.20 

47.57 
42.85 
38.IJ 
33.38 


Ratio  of 

Weights 

1.00 

1.43 
2.20 


100 

"57^ 
52.74 

48.02 

43.25 
38.50 
33.69 


HP  HRS.  PER  1000  CBOSS  TON  MILES  (TRAIIJNC)  ^_ 

p.A7  w  40.21    39.09    3b.34    37.41    3b.H5    3b.47    3b.oi    35 


8.18 

10.22 

12.81 
16.33 


35.70  34.74  34.10  J3.31  32.83  32.51  32.11  31.88 

32.09    31.00    30.47    2^.79    25.39    29.12  28.79  28.58 

28.15    27.46   27.00    26.43   26.09    25.86  25.57  25.40 

23.13  22.89  22.74 

20.72  20.51  20.38 


25 


:ll 


24.48   24.09   23.61   23 


22.43   21.92   21.57   21.14   20.89 


■M 


W  -  Weight  of  Locomotive  (Engine  is.   Tender)  in  Tons. 


of  locomotives  which  are  shown  at  the  top  of  each  table  and  correspond  to  the  definite 
weight  distributions  shown  in  the  right-hand  columns  in  the  headings  for  each  table. 
For  example,  it  is  assumed  that  for  locomotives  in  Group  II  the  engine  weighs  1.82  tons 
and  the  engine  and  tender  weighs  3.21  tons  for  every  ton  on  drivers  and  for  Group  III 
the  engine  weighs  1.65  tons  and  the  engine  and  tender  2.88  tons  per  ton  on  drivers. 
Thus  the  ratio  of  the  weight  of  the  engine  to  the  weight  on  drivers  will  indicate  in 
which  group  (or  between  which  groups)  the  locomotive  belongs.  It  is  then  necessary 
to  assume  what  the  weight  of  the  locomotive  (engine  and  tender)  is,  obtaining  this 
weight  by  multiplying  the  weight  on  drivers  by  the  corresponding  ratio  shown  for 
typical  locomotives,  which  in  the  case  of  Group  II  is  3.21  and  for  Group  III  is  2.88. 

(d)  Types  of  trains. — In  practice  there  are  four  types  of  trains  which  need  to  be 
considered,  namely,  passenger  trains,  coal  and  ore  trains,  manifest  freight  trains  and 
trains  consisting  of  empty  cars. 

It  is  assumed  that  typical  passenger  trains  will  consist  of  60-ton  vestibule  cars,  coal 
and  ore  trains  of  80-ton  freight  cars  and  manifest  freight  trains  of  45-ton  freight  cars. 
No  data  have  been  worked  up  for  empty  trains. 

Modern  types  of  passenger  cars  are  lighter  than  standard  vestibule  equipment  and 
are  streamlined  which  would  be  expected  to  modify  the  results  of  passenger  train  oper- 
ation. The  following  discussion  on  train  resistance  clarifies  this  point. 

(e)  Train  resistance. — The  resistances  of  the  tj^pical  trains  have  been  based  on  the 
Davis  formulas  because  they  are  regarded  as  more  or  less  standard  and  because  the  re- 
sults of  some  recent  high  speed  tests  made  by  the  Mechanical  Division  with  a  train  com- 
posed of  60-ton  vestibule  passenger  cars  checked  closely  with  the  Davis  formulas  and 
other  tests  with  80-ton  freight  cars  also  conformed  with  the  Davis  formula. 

By  referring  to  Fig.  1  it  will  be  seen  that  the  resistances  of  60-ton  vestibule  passenger 
cars  and  80-ton  freight  cars  as  obtained  by  the  Davis  formulas  are  practically  the  same. 


Economics   of    Railway    Location    and    Operation 


65 


14 

13 

ja  12 


/ 

/ 

r 

/i^ 

/ 

/ 

/ 

/ 

/ 

f 

/ 

/ 

y 

A 

/ 

^ 
X 

^r^ 

y 

/ 

--• 

/ 

^ 

y 

y 

^ 

y^' 

"^^^ 

^\ 

\ 

,.- 

^ 

>^ 

^ 

^ 

^ 

^ 

^ 

--^ 

s^" 

?? 

^^^ 

--^ 

A-    Resistance    45 
B-   Resistance   50 
C-  Resistance   50 
D-  Resistance   60 
E-   Resistance   60 

ton 

ton 
ton 
ton 
ton 

freight   car 

vestibule  passenger  car 
stream    lined    pass    cor 
vestibule   passenger  car 
freight    car 

^ 

D^ 

EG 


40  50  feO 

Miles    per    hour 


70 


60 


90 


100 


Fig.  1. — Chart  of  Davis  Formulas  for  Train  Resistances  of  Passenger  and  Freight  Cars. 

For  this  reason  data  pertaining  to  coal  and  ore  trains  also  apply  to  passenger  trains 
composed  of  60-ton  vestibule  cars. 

If  it  is  assumed  that  streamlining  reduces  the  effective  cross  section  of  passenger  cars 
25  percent  then  the  resistance  of  SO-ton  streamlined  cars  will  also  approximate  the  re- 
sistance of  80-ton  freight  cars  and  the  same  data  will  apply  to  50-ton  streamlined 
passenger  cars. 

Ordinarily  it  can  be  assumed  that  any  other  steps,  such  as  articulation  or  reduced 
cross  section  which  are  available  for  reducing  the  weight  of  passenger  cars  still  further, 
will  reduce  the  resistance  of  the  train.  Consequently  on  this  basis  the  data  given  for  coal 
and  ore  trains  cover  a  wide  variety  of  passenger  trains  of  the  same  total  weight. 

In  the  case  of  freight  trains  there  is  no  practical  way  to  compensate  for  the  higher 
resistance  of  the  lighter  weight  per  car,  hence  it  has  been  necessary  to  work  up  separate 
tables  based  on  45-ton  cars  for  manifest  freight  trains.  These  tables  are  shorter  than 
those  for  passenger  or  coal  and  ore  trains  because  there  is  practically  no  demand  for 
speeds  in  excess  of  70  miles  per  hour  or  for  trains  in  excess  of  140  to  150  cars  in  manifest 
service. 

II.  Operation 

(a)  Grades  and  curves. — Grades  and  curves  have  a  modifying  effect  on  all  the 
relations  which  are  shown  in  the  tables,  because  they  effect  the  train  resistance,  the  speed 
and  weight  of  trains,  and  also  the  power  consumption.  These  effects  are  in  some  respects 
susceptible  of  mathematical  determination  but  they  are  also  the  cause  of  speed  restrictions 
which  are  unpredictable. 


66 


Economics   of   Railway   Location    and   Op  e  r  a  t  i  o  n 


TABLE  NO.   14 

UASUDU  SFEEIS  HI'S  TARIOtlS  WEIOBT  TRAINS 

ON  M?FERENT  GRADES 


PASSENGEER  OR  COAL  AND  ORE  TRAINS 


UMC 

-BISCEMT 

(SJJE 

SPEED 

-0.2 

-0,1 

Lerel 

0.1 

0.2 

0.4 

0.6 

1.0 

110 

1.69  w 

1.26  W 

.95  1^ 
1.70  " 

.71  w 

.52  W 

.25  w 
.66- 

.07  W 

0.00  w 

100 

2.91  - 

2.19  " 

1.33" 

1.0b  - 

.06  - 

^ 

4.35" 
b.59  - 

3.21  - 

.2.47  " 

1.95" 

1.56  - 

1.04  - 

.26  - 

4.66  - 

3.53- 

3: 

2.23  - 
3.28- 
4.58- 

1.52  - 

1.06  " 

.51 " 

S 

10.62  " 

17.3?  " 
23.06  - 

J>^: 

5.2p  - 
7.56- 

2.25  • 
3.14" 

1.62  - 
2.29  " 

.90  ;; 

W 

13.30  - 
16.65  - 

9.17  - 

6.48  - 

3.72  " 

2.72- 

1.62  - 

•jO 

31.27- 

11.17  " 

8.25  - 

4.40  - 

3.23- 

1-94  - 

A-J 

21.24  " 

13.74  - 

10.01  - 

7.79  - 

5.27  - 
6.40  - 

3.87- 

40 

27.84- 
36.74  " 

17.27- 

12.35  " 

11.'64  - 

4.70  - 

2.91  " 

3^ 

21.70  - 

18.84  " 

7.75  - 

5.70  - 

6.90  - 

3.56" 

^0 

27.43  " 

14.24- 

9.40  - 

4.33  - 

25 

34.90- 

23.37  " 

17.45  " 

U.42  - 

8.34" 

5.27- 

W  -  Weight  of  LoeomotlTe  (Engine  fc  Tender)  In  Tons. 

TABLE- NO.   15 

UAXQTOM  SPEEDS  WITH  VARIOUS  WEIGMT  TRAINS 

ON  DIFFERENT  GRADES 

MANITEST  FREIGHT  TRAINS 


MAX 

PERCENT 

GRADE 

SPEED 

-0.2 

-0.1 

Level            0.1 

0.2 

O.A 

0.6 

1.0 

^ 

b.30  w 

4-75  * 

3.78  W 

3.10  w 

2.59  W 

3,69   " 

1.87  W 
2.66  - 

1.38  w 

.79  w 

9.76 " 

i:i: 

5.54" 

4.46 " 

2.00   " 

1.20  - 

5") 

12.52  - 

6.75  " 

5-39  " 

4-43  " 

3.19  - 

2-28  " 

1.49  - 

50 

16.25  " 

11.05  " 

8.25" 

6.52  - 

5-33  " 

3.80- 

2.86  - 

1.79  " 

4'j 

1A.03  - 

18. 12  - 

10.24  " 

7,97  " 

6.49  " 

4.60  " 

3-47  " 

2.19  " 

40 

12.87  " 
16. iS  - 

9.08  - 

7.95  " 

5.61  " 

4.24  " 

2.70  " 

35 

12.23  " 

9.75  " 

6.83" 

5.15  - 

3.31  - 

W  -  Weight  of  LoeomotlTe  (Engine  &  Tender)  In  Tons. 


(b)  Weights  of  trains. — Tables  14  and  IS  show  the  relation  between  the  maximum 
speed  and  weight  of  train  for  a  number  of  different  grades  starting  with  — 0.2  percent 
and  increasing  up  to  +10  percent.  These  data  are  only  indicative  because  they  are  diffi- 
cult to  apply  in  practice,  so  that  over  an  actual  profile  it  is  generally  necessary  in  the 
final  analysis  to  resort  to  first  principles. 

(c)  Frequency  of  stops. — The  relation  of  the  average  speed  to  the  maximum  speed 
for  trains  on  level  track  making  frequent  stops  varies  somewhat  with  different  types  of 
locomotives.  When  the  distance  between  stops  is  short  it  is  sometimes  impossible  for  the 
train  to  reach  maximum  speed  before  applying  brakes.  In  this  study,  the  ratio  of  average 
speed  to  maximum  speed  is  based  upon: 

1.  Operation  of  the  locomotive  at  normal  capacity 

2.  An  assumed  uniform  braking  distance  for  all  speeds  of  75  miles  per  hour  or  less 
and  a  uniform  retardation  rate  for  speeds  in  excess  of  7S  miles  per  hour 


Economics   of    Railway    Location    and    Operation 67 

Normal  horsepower  capacities  are  based  on  Table  1601  in  the  Manual.  The  time  and 
distance  consumed  in  braking  will  vary  with  the  type  of  train,  speed,  manner  in  which 
brakes  are  applied  and  the  type  of  brake  equipment.  Tables  1  to  13  are  based  on  the 
average  of  several  classes  of  locomotives  and  give  a  reasonably  close  approximation  of 
speed  relations.  Should  the  method  outlined  be  employed  in  the  examination  of  any 
typical  operation,  appropriate  factors,  applicable  to  the  service  on  the  railway  involved, 
must  be  substituted.  The  heavy  dividing  lines  in  the  tables  have  been  inserted  to  indi- 
cate the  approximate  distance  between  stops  required,  under  the  stated  conditions  of 
acceleration  and  braking,  to  permit  the  attainment  of  maximum  speed  before  the  brakes 
must  be  applied. 

When  using  these  tables  it  is  important  to  adjust  for  the  duration  of  stops,  and 
include  an  allowance  for  slow  downs. 

(d)  Slow  downs. — It  is  variously  estimated  that  two  to  three  slow  downs  from 
maximum  to  70  percent  speed  on  level  track  for  a  distance  of  ^  mile  are  equivalent  to 
making  a  stop.  Two  slow  downs  correspond  to  high  speed  passenger  trains  and  three 
slow  downs  to  slow  speed  drag  freight  trains. 

The  time  lost  making  stops  can  be  obtained  by  speed-time-distance  calculations 
according  to  the  method  presented  in  Chapter  16  of  the  Manual. 

(e)  Power  consumption. — The  horsepower-hours  are  based  on  the  normal  output  of 
the  boiler  exclusive  of  auxiliaries.  It  is  generally  assumed  that  1.0  horsepower-hour  is 
equivalent  to  IS  lb.  of  steam,  and  that  15  lb.  of  steam  corresponds  to  30,000  to  32,000 
B.t.u.  fired,  or  about  2.3  lb.  of  13,000  to  14,000  B.t.u.  of  coal  per  horsepower-hour. 

Some  authorities  include  the  steam  required  for  auxiliaries  and  use  18  lb.  of  steam 
per  horsepower-hour  or  36,000  to  39,000  B.t.u.  fired.  This  is  equivalent  to  about  2.75  lb. 
coal  per  horsepower-hour.  In  the  final  analysis  it  is  usually  more  satisfactory  to  make 
separate  allowances  for  auxiliaries. 

Conclusions 

It  will  appear  from  the  application  of  the  data  contained  in  these  tables  that  high 
speed  has  a  wide-spread  influence  not  only  as  regards  fuel  and  water  consumption,  crew 
wages,  and  way  and  equipment  maintenance,  but  also  as  regards  capital  expenditures. 

Actually,  the  operating  expenses  and  capital  expenditures  will  very  likely  be  greater 
than  those  anticipated,  based  on  the  theoretical  data  presented  in  this  report. 


This  report  is  offered  as  information. 


68 Economics    of    Railway    Location    and    Operation 


Report  on  Assignment  8 

Economics  of  Railway  Location  and  Operation  as  Affected  by 
Railway  Electrification 

Collaborating  with  Electrical  Section,  Engineering  Division,  AAR 

E.  E.  King  (chairman,  subcommittee),  T.  B.  Ballantyne,  V.  T.  Boughton,  L.  E.  Dale, 
E.  K.  Eugene,  F.  N.  Nye,  E.  H.  Roth,  H.  A.  Shinkle,  C.  B.  Stanton,  H.  M.  Stout. 

This  year  the  subcommittee  has  brought  together  data  on  the  electrification  of  steam 
railroads  in  Mexico,  Cuba,  Costa  Rica,  Argentina,  Bolivia,  Brazil,  Chile,  Venezeula, 
Australia,  and  New  Zealand.  These  data  are  shown  in-  Table  1.  The  materials  for  all  of 
these  countries  except  Brazil  were  obtained  by  United  States  consuls,  commercial  attaches, 
and  trade  commissioners  in  those  several  countries  upon  the  request  of  the  Railway 
Section,  Transportation  Division,  Bureau  of  Foreign  and  Domestic  Commerce,  Depart- 
ment of  Commerce  of  the  United  States.  The  division  has  been  very  generous  in  its  help 
in  getting  together  these  data  for  the  use  of  the  subcommittee.  The  information  on  the 
PauUsta  Railway  in  Brazil  was  obtained  directly  from  charts,  profiles,  and  tables  secured 
by  the  United  States  embassy  in  Rio  de  Janeiro.  That  for  the  other  two  lines  in  Brazil, 
the  Western  Minas  and  the  Central  Railway  of  Brazil,  was  obtained  from  the  report  of 
the  Electrification  committee  of  the  National  Electric  Light  Association  as  indicated  in 
its  last  issue,  Publication  No.  247,  March  1933,  Electrification  of  Steam  Railways,  and 
from  the  issues  of  the  Railway  Gazette,  London. 

Table  1  shows  the  locations  of  the  electrified  sections,  the  gage  of  the  track,  the  total 
number  of  miles  electrified,  and  gives  information  concerning  tunnels,  ruling  grades,  sys- 
tems of  electrification,  kinds  of  traffic  involved,  number  and  capacity  of  motive-power 
units,  energy  requirements,  and  reasons  for  electrification.  As  the  last  column  of  the  table 
indicates,  some  of  these  lines  were  electrified  on  account  of  tunnel  operation,  some  on 
account  of  heavy  grades,  some  on  account  of  scarcity  of  fuel,  some  on  account  of  density 
of  traffic,  and  some  to  bring  about  general  economy  in  operation. 

Practically  all  installations  are  direct  current  with  overhead  type  of  distribution 
system.  The  voltages  on  the  d.c.  projects  vary  from  600  to  3,000.  The  only  a.c.  installa- 
tions are  on  the  Pacific  Electric  Railway  in  Costa  Rica,  where  the  power  is  single  phase 
with  a  voltage  of  15,000,  and  on  the  Guaqui  to  La  Paz  Railway  in  Bolivia,  where  the 
power  is  three  phase  with  a  voltage  of  S7S.  In  suburban  service,  motor  cars  are  com- 
monly used,  but  for  through  freight  and  passenger  service,  locomotives  are  generally 
employed. 

With  the  exception  of  one  line.  The  Chile  Iron  Mines  Company,  the  report  includes 
only  those  lines  that  were  at  one  time  operated  wholly  or  in  part  by  steam  power,  but 
which  are  now  operated  in  part,  at  least,  by  electric  power  supplied  from  a  central 
station. 

It  was  the  intention  of  the  subcommittee  to  secure  data  on  all  of  electrified  lines  of 
the  eastern  hemisphere  as  well  as  those  of  the  western,  but  the  war  conditions  have  made 
this  undertaking  practically  impossible.  This  completes  the  study  of  this  phase  of  the 
economics  of  railway  location  and  operation  as  affected  by  railway  electrification.  It  is 
hoped  that  at  some  later  date  when  conditions  throughout  the  other  countries  have 
become  more  stabiHzed,  that  the  subcommittee  will  be  able  to  secure  data  on  their  elec- 
trifications and  to  include  them  in  a  report  similar  to  this  one. 


The  report  is  submitted  as  information. 


TABLE    1          PRINCIPAL    CHARACTERISTICS  OF  STEAM  RAILROAD  ELECTRIFICATIONS  ON  LINES  THROUGHOUT  THE  WORLD 

FOR   STATISTICAL  YEARS    INDICATED 

COHTIMENT   COUNTPY 

Railway 

LOCATION 

In 

MILES 

End 

of 

Stotis- 

ticol 
Year 

RULING  CBAEIE 

TUNNELS 

SYSTEM  OF  ELECTBlf  (CATION 

TRin- 

CffllOK 
BEOUI 

TE« 
TBIC« 

ELECTRIC     MOTIVE-POWER     EQUIPMENT 

kw-hus  of  eneooy 
supplied  duoing 
the  last  year 

TRAFFIC 
AFFECTED 

PRINCIPAL  REASONS 
FOR  ELECTI!\F1CATV0N 

Routj 

Mciin 
Trotk 

All 
rrodo 

Cur- 
rant 

Volts 

Pho!!  CljCiC 

Contod 
Line 

FREIGHT   LOCOMOTIVES 

PASSENOER  LOCOMOTIVES 

rASSENGE«MOTO0.CA« 

°h 

Lonqth 
ft 

No 

Lengtti 
ft. 

No 

WiiqM 
■fens 

HP 

No 

Tn'T 

Troeivs 

HP 

No 

WlqH 

^EFfc"" 

«r 

Qanandtad 

'^J^oho5fl(^ 

Totol 
ConsuTTKd 

UNITED  STATESi      5cc  -c?0-  -n  'rocccdrnqi  M  A 

RE. A  Vol  40.  1939,  page  180 

Canada       I                      d,--c 

di*to 

NORTH 
AMERICA 

VEXICO 

El     Pctttdsi    Ry        'SwBL-tR  Limb) 

Nao'   Chlhuahuo 

30 

18 

18 

23 

12/31/58 

imn 

65l0 

1 

500 

ac 

600 

- 

O.H. 

1924 

1925 

\ 

" 

11400 
£l980 

200 

- 

- 

- 

- 

- 

- 

- 

0 

1.280,600 

1.280,600 

Fra'tqht 

Qractar  Effinonoj  of  ^Itfc  Pcv*ar 

Mexican  R-c  Co    Ltd 

Espsranza  to  Po50  del  Mocho 

56.5 

64 

64 

75 

H3« 

4.70 

52,800 

IG 

3,4  09 

D.C 

3000 

O.H. 

1923 

1925 

,2C« 

1545 

54,000 

2800 

SEE 

fRElSIIT 

- 

- 

- 

0 

17,520,000 

r7.520.000 

Freiqht 

HaovgGroo«5-  Conqaa*ion 

"fE^VE-'    Cusas  Rt- 

Hovana  to  Motzano^ 

56.5 

81 

81 

103 

1939 

2.50 

4,257 

" 

0 

D.C. 

1200 

- 

O.H. 

1919 

1920 

11 

60 

20,000 

820 

- 

- 

21 

32,5 

1800 

220 

0 

5,241,806 

5.241,808 

Passenger 

Haavq  Qmdas,  Firti  scarce 

CU5A 

-rn-HE-  -E.aM'NaL  Rv 

Coso  Blanco  -  Pcglo 

56.5 

35 

J5 

60 

1939 

2.11 

560 

» 

0 

D.C 

1200 

- 

- 

O.H. 

1919 

1920 

u 

es  Hirshatj 

Cuboi 

Bq 

Dollinq 

Stock 

LN  -E-   ^  -WAY5  OF  Havana 

Movano  8c  Suburbs 

56i 

84.4 

I0J2 

1432 

6/30/39 

156 

4,560 

0 

0 

D.C. 

600 

- 

O.H. 

1905 

1906 

I 

60 

?8;88S 

loo 

!3 

11 

1 

- 

- 

- 

- 

0 

3.142.610 

3,142,810 

PQSsenqer&Freiqht 

Econonnj 

CBnULMQBCA   CCS-TA  RiCA       =i;-  =  =.EC-a,c  Rv 

5anJos«''o  fV^torcnos  Circuclas  to 
Alaluela.ond  El  (tobic  fo  E5parata 

n 

87 

57 

92 

I93t 

2.S0 

22,966 

1 

1,100 

A.C. 

15,000 

1 

20 

O.H. 

1929 

1930 

■  >' 

66 

39,648 

too 

SEE 

FREIOI  T 

13 

6,465,400 

0 

6,465,400 

Ganaro!  fcFraiqht 

Water  abundant-,  Hiqti  Cost  af  Cool 

CEf-:i.  isjENT'NE   Ch- 

66 

44 

94 

120 

6/30/39 

0.8 

5,906 

0 

0 

D.C. 

800 

- 

- 

3R 

1916 

- 

- 

- 

- 

- 

- 

- 

5fl 

10>0 

Bl,123,2!8 

0 

1!4II,850 

Suburban  fbsswqtr 

Improve  Schedules 

1  ABDENTINA 

2j'yc5  i-qE5  Western  Ry. 

Buenos  Aires  to  Moreno 

66 

22 

63 

82 

1937 

3.80 

410 

2 

18,762 

O.C. 

800 

- 

- 

3R 

1915 

1923 

2 

70 

19,700 

920 

- 

- 

- 

- 

74 

S3 

13,600 

800 

0 

35,405,460 

35,405,460 

Fniiqht  1  Suburton 

Irnprove  Sarvice-.  Increas* 

Capocjttj,  r.jpra'  :c<"oticr 

-=-EN-"-t  T:^NStMDlNE 

Bolivia 

c-'jtsu'  -c  -A  Pa:   By. 

Lo  Paz  to  Alto 

3M 

5 

7 

9 

1939 

7.00 

1,476 

0 

0 

A.C, 

575 

3 

50 

an. 

1905 

3 

22 

6500 

200 

2 

220 

7200 

250 

3 

100 

100 

0 

469,199 

420,000 

Rassanqarifrlight 

5h0r+ar  iiCffn^i  j;a  i.c-oqe 
Grj^leof  J!-.,  Fj,'l=norr,j 

Pauusta.  Ry 

Jundiohij  to  Rincoo 

8311 

m 

206 

252 

1939 

1.80 

29,651 

0 

0 

ac. 

3000 

- 

O.H. 

1919 

1922 

1 

If 

# 

1 

1 

ill 

iS:IJ8 

- 

- 

- 

- 

Q 

69,46^275 

69,469,275 

fc5Stnqjr8tfrjiqht 

Hiqh  Cosf  of  l.-noc-ted  Coal 
Improve  Troffic 

Wejtekn  Minas  By. 

Barro  Monsa  to  Auqusto  Pestana 

39.4 

46 

48 

1953 

xm 

158,400 

O.C. 

IbOO 

- 

O.H. 

1927 

1929 

8 

160 

- 

- 

- 

- 

Passenqjr8<  Freiqht 

Hi'qh  Cost  of  Lmooried  Cool 
tfnorove  Traffrc 

CemHAi.  Rt  of  Bra-zil 

R)o  do  iJon«iro  ^o  Novo   Iquoisu   ond 

630 

27 

«2 

1937 

D.C. 

3000 

- 

O.H. 

1916 

1937 

15 

84 

1,580 

6  MM 

US 
52 

709 

- 

- 

- 

- 

t^ssenqerfli  freight 

Dense  Troffic;  Steep  G-ades 

BntEKEV  STta  TO  •,  WLE  IM«  MINES  ro 

Tofo  to  Cruz  Qronde 

56J 

l.-i 

15 

186 

1939 

0 

- 

(1 

0 

D,C. 

2400 

- 

O.H. 

1914 

1922 

3 

IJO 

42.200 

1,370 

- 

- 

742,600 

0 

739,600 

Freiqht 

MeovLj  Grades ;  Yfeter  sccrte 

Chile 

:»rt»MA  StL'PERA  iWLO-O^ILEAN 

Totopillo  to  Tpqre,  Toco  &.  Btdre  dtVoldjvio 

n 

24 

24 

33 

6/30/39 

450 

126,720 

0 

0 

D.C, 

1600 

- 

O.H. 

I9J1 

19Z7 

7 

66 

26,460 

1,118 

- 

- 

- 

- 

- 

- 

- 

- 

0 

5.465,664 

4465,664 

Fraiqht  *  Mixad 

Hmvij  Grodes;  fw!  iWotir  scarce 

Valparaiso  to  Los  And85&.5ontjoqo 

fifll 

144 

181 

745 

1939 

2.25 

48  730 

6 

3i498 

ac. 

3000 

- 

O.H. 

1921 

1924 

15 

113 

34,729 

1,680 

1268 

25,180 

- 

- 

- 

- 

0 

46,387,744 

48387  744 

P355anqari  Fniiqht 

HC0V4 Snides.  Fwl  scarce. 
Incraose  Copootu 

.JVCAL  '5\.HEfiMr^HE    0^ 

Rio  Blanco,  Chile  to  Arqentim  Bortfcr 

«4 

n 

22 

24 

1939 

8.00 

5,709 

SI 

21,080 

D.C. 

3000 

O.H. 

1925 

1927 

3 

94 

16,200 

886 

SEE 

FREiqHT 

- 

- 

- 

0 

602,530 

802,530 

Possffnqari  Freight 

-:..-:':,-  --f':- i:!' s:rTt 

VENEZUELA       --  ':.:  ■■■-  i  ■-■■-■ui  P-. 

Lo  OuQira  to  Coracos 

36J1 

13 

23 

25 

12/31/36 

4.25 

101,711 

8 

1,312 

O.C. 

1600 

- 

O.H. 

1926 

1928 

6 

353 

3.660 

456 

- 

4 

30.8 

1,180 

264 

1,560,000 

0 

592  800 

411  Traffic            =  r       :          ^    -   •.•-.— 

OCEANIA 

Australia 

'^^  ': --  :■•-"_  '"'f^KVEMT PjuLwfirs 

Sijcineij  &  Suburbs 

563 

94 

2SI 

281 

6/30/39 

1!3 

''lis 

3 

20,872 

D.C. 

1500 

- 

O.H. 

1926 

- 

- 

- 

- 

- 

456 

IIS 

i'S'.Sm 

to 

474,259,177 

0 

203714,725 

Possenqcr 

:;-    ■:'      -.-;--:--.^  x-ntw^ 

V,,.,,  .,_  -,    „.,. 

Melbourne   &  Suburbs 

63.0 

173 

349 

439 

6/30/38 

3.30 

3,168 

3 

1,075 

D.C 

1500 

OH. 

1919 

12 

616 

2^150 

620 

359 

53 

179,747,383 

3,194 

Suburban  R3sscnq?r 

.n:-:cs:  .:r::  % 

NEW  Zealand 

Hew  '.■■.J.--Z  ;r.i>.ik'£HT  Railways 

Otira  to  Arthurs  Pass 

« 

8 

8 

13 

3/31139 

J.I6 

33,000 

1 

28,092 

ac 

1500 

- 

O.H. 

1920 

1923 

JM 

5« 

14,000 

1240 

SEE 

FREIQ 

HI 

- 

- 

- 

1,872,200 

R3Ssanqer8L  freiqht 

Lcpo  Turne'  i.  5tto  Srwlie^t 

Chhstchurcti  to  Lyttleton 

12 

6 

n 

19 

3/31/39 

0.67 

3,960 

1 

8,514 

D.C. 

1500 

- 

- 

O.H. 

1126 

1939 

jW 

56 

14,400 

H8S 

SEE 

FBEIS 

HT 

- 

- 

- 

2,259.960 

Subort  fciJS.lFrt 

Tunnel 

Wdlinqton  to  Poskokoriki 

42 

16 

41 

57 

3/31/39 

1.75 

5,280 

7 

21,3?5 

D.C. 

1500 

- 

- 

O.H, 

1931 

,(0) 

915 

19,000 

1240 

SEE 

FEEIO 

n 

- 

- 

- 

- 

Suburt  fVjssfcfraiqfit 

Tunnel  fltOrodien+s 

Wcllinqton  to  Johnsonville 

a. 

6 

6 

s'" 

3/31/39 

238 

700 

7 

3^104 

nc. 

IMO 

- 

- 

O.H. 

1935 

1938 

1*" 

One  of  lh«  8  abovo  lo  b<  uiod  intsrchonqaobly  on 
this  ond  thcWGllinqton-PoskaUonVi  Lin« 

6 

48 

10,000 

660 

1,694,980 

3ut>ufb  PosvlFrftqht 

Tbnnels  atC3rTidien*s 

en   Not  includinq  Wdllinqton  Yard                                                                 "'  Fraiqht  kPossinqir  5«™cs                                                                                                                                                                                                  .-- 

E  cono  m  ics    of    Railway    Location    and    Operation  69 


Report  on  Assignment  11 

Train  Resistance  of  Freight  Trains  Under  Various  Conditions 
o£  Loading  and  Speed 

L.  K.  Sillcox  (chairman,  subcommittee),  J.  A.  Anderson,  J.  W.  Barriger  III,  L.  E.  Dale, 
J.  M.  Farrin,  A.  W.  Laird,  M.  F.  Mannion,  L.  G.  Morphy,  J.  W.  Porter,  O.  E.  Selby, 
R.  R.  Strother. 

Foreword 

The  organization  of  a  new  subcommittee  and  the  assignment  of  investigation  of 
freight  train  resistance  inaugurates  a  new  subject  for  report  by  Committee  16.  Various 
elements  of  train  resistance  have  been  studied  as  specially  assigned  subjects  of  AREA 
committees  at  various  times.  The  work  of  this  committee  then  consists  of  investigating 
all  available  data  bearing  upon  the  subject,  evaluating  their  appropriate  application 
under  modern  conditions  and,  if  possible,  presenting  a  final  preferred  method  with  mod- 
ifying factors  to  meet  specific  conditions. 

This  introductory  report  endeavors  to  assemble  many  of  the  general  train  resistance 
formulas,  both  freight  and  passenger,  which  have  had  at  least  limited  or  local  use 
through  the  years  and  to  discuss  the  effect  of  various  train  resistance  components.  Factors 
derived  through  the  operation  of  passenger  trains  have  been  reported  since  many  resist- 
ance components  have  their  equivalents  in  both  principal  services  and  many  of  the  best 
train  resistance  data  have  been  accumulated  through  the  operation  of  test  passenger 
trains. 

Train  Resistance 

Train  resistance,  the  combination  of  forces  which  must  be  overcome  to  set  a  train 
in  motion,  continue  it  in  motion  at  a  constant  speed,  or  to  accelerate  it  to  a  higher 
speed,  is  customarily  divided  into  two  main  divisions;  first,  those  resistances  inherent 
to  all  train  operation;  and  second,  those  encountered  only  on  grades,  curves,  during  the 
acceleration  cycle,  or  when  operating  in  adverse  winds,  called  incidental  resistances. 
They  may  be  segregated  as  follows: 

A.  Inherent  Resistances 

1.  Track  or  flange  resistance 

2.  Rolling  resistance 

3.  Oscillatory  and  miscellaneous  frictional  resistance 

4.  Journal  friction 

5.  Air  resistance  in  still  air 

B.  Incidental  Resistances 

1.  Grade  resistance 

2.  Curve  resistance 

3.  Acceleration  resistance 

4.  Wind  resistance 

In  addition  to  the  above,  there  is  to  be  considered  the  machinery  friction  of  the 
steam  locomotive  and  the  motor  gearing,  bearing,  and  other  transmission  losses  of  elec- 
tric or  Diesel-electric  power  units,  active  between  the  power  source  and  the  rails,  but 
this  resistance  does  not  enter  into  practical  consideration  of  power  requirements  inasmuch 
as  power  ratings  are  usually  referred  to  tractive  effort  at  the  rail. 


70 Economics    of    Railway    Location    and    Operation 

Inherent  Resistances 

Inherent  resistances  are  deiined  as  those  met  when  operating  at  constant  speed  on 
tangent,  level  track  in  still  air.  As  will  be  noted  from  the  preceding  paragraph,  they 
arise  from  five  main  sources: 

A  (1)  Track  or  Flange  Resistance. — As  the  car  truck  moves  along  the  rails,  it 
generally  oscillates  laterally,  the  wheel  flanges  bearing  first  upon  one  rail  then  the 
other,  at  each  impact  introducing  a  force  tending  to  change  its  direction.  Further, 
frictional  resistance  results  from  the  rubbing  action  between  wheel  flanges  and  rail 
heads.  Light  equipment  exhibits  this  oscillating  or  nosing  tendency  to  a  greater 
degree  than  do  the  heavier,  conventional  cars  with  their  greater  inertia  combined 
with  six-wheel  trucks  resisting  the  development  of  resonant  oscillation.  Moreover,  a 
wheel  flange  throat,  worn  to  a  shorter  radius  than  that  of  the  rail  head,  superimposes 
a  wedging  action  between  the  flange  and  rail  head,  materially  increasing  the  rubbing 
friction  between  the  two  surfaces. 

A  (2)  Rolling  Resistance. — Low  track  joints  and  track  in  poor  surface  from 
any  cause  aggravate  the  condition,  since  the  impact  at  speed  of  a  car  wheel  upon 
any  track  irregularity  initiates  or  intensifies  the  oscillatory  motion  and  increases 
flange  pressure.  A  resilient  track  structure  constantly  presents  an  uneven  surface  to 
the  rolling  wheel,  introducing  an  equivalent  adverse  grade,  the  extent  of  the  tendency 
varying  directly  with  the  yielding  properties  of  the  track.  Rolling  resistance  is  so 
closely  associated  with  track  and  lateral  oscillatory  resistances  that  it  is  impossible 
to  segregate  and  measure  the  effect  of  any  one  component.  The  deformation  of  the 
wheel  and  rail  surfaces  extends  further  into  a  bending  and  depression  of  rails,  thus 
providing  an  uneven  track,  indirectly  augmenting  flange  pressure. 

A  (3)  Oscillatory  and  Miscellaneous  Frictional  Resistance. — Oscillatory  or  mis- 
cellaneous frictional  resistance  as  here  defined  is  intended  to  include  all  undirected 
but  unavoidable  motions  which  are  incidental  to  train  operation;  the  swaying  and 
interaction  of  car  bodies  with  consequent  energy  absorption,  spring  compression  and 
recoil,  recurrent  surges  throughout  the  train,  friction  at  coupler  faces,  journal  box 
pedestals,  bolsters,  and  center  plates,  along  with  many  other  miscellaneous  unpro- 
ductive motions,  combine  to  form  an  important  fraction  of  total  train  resistance. 

A  (4)  Journal  Friction. — Journal  friction  arises  from  contact  between  the  rotat- 
ing axle  journal  and  its  relatively  stationary  bearing.  This  resistance  component 
varies  over  a  wide  range  of  values  depending  directly  upon  journal  box  tempera- 
ture, viscosity  and  other  characteristics  of  the  lubricant  employed,  and  its  proper 
distribution  between  journal  and  bearing.  Indirectly,  atmospheric  temperature  and 
length  of  period  of  rest  or  motion  are  important  in  so  far  as  they  influence  bearing 
temperatures.  Much  of  the  lubricant  is  squeezed  from  the  journal  bearing  of  a  car 
at  rest,  draining  into  the  journal  box,  leaving  a  partially  and  poorly  lubricated  sur- 
face. The  viscosity  of  the  oil  may  be  increased  due  to  lower  temperature,  increasing 
its  shearing  resistance. 

A  (5)  Air  Resistance  in  Still  Air. — Head-end  resistance,  the  most  important  of 
these  components  when  rail  motor  cars  and  very  short  trains  are  operated,  is  a  func- 
tion of  frontal  area,  shape  and  nature  of  the  surface,  and  vehicle  speed.  It  is  due  to 
displacement  of  the  air  by  a  vehicle  and  the  production  of  a  high  pressure  zone 
through  which'  the  vehicle  endeavors  to  press.  Rear-end  suction  is  closely  associated 
with  head-end  resistance  but  is  negative  in  its  effect,  retarding  forward  motion  of 
the  vehicle.  Air  resistance  of  a  locomotive  is  reported  by  Goss  to  be  approximately 
four  times  the  corresponding  resistance  of  the  last  car  of  a  train,  based  upon  labo- 
ratory tests  conducted  in  still  air.  Rear-end  suction  is  dependent  upon  tail  fairing. 


Economics   of    Railway    Location    and    Operation 71 

cross-sectional  area  at  the  rear,  and  train  speed.  Mathematically,  it  combines  read- 
ily with  head-end  resistance,  responding  to  similar  factors,  and  generally  is  so 
treated.  Skin  friction  is  caused  by  the  dragging  action  created  by  the  relative  motion 
of  air  with  respect  to  the  sides  of  car  bodies  and  the  formation  of  eddies  and  pres- 
sure strata.  As  train  length  increases,  skin  friction  dominates  in  air  resistance  effects. 
It  can  be  controlled  by  provision  of  smooth  car  sides  and  roofs,  which  carry  less 
depth  of  air  in  the  high  pressure  stratum  adjacent  to  the  exposed  areas,  reducing 
eddy  and  shearing  resistances.  Ground  effects,  truck  resistances,  and  the  obstruction 
to  free  air  flow  created  by  attachments  beneath  car  floors  combine  all  the  effects  of 
head-end,  rear-end  suction,  and  skin  friction  in  a  complex  and  still  indeterminable 
manner. 

Incidental  Resistances 

Incidental  resistances  are  those  which  are  not  common  to  train  operation  under  all 
conditions. 

B  (1)  Grade  Resistance. — Grade  resistance  is  a  fixed  and  unalterable  quantity 
which  is  dependent  only  upon  the  rate  of  rise  of  track.  It  is  equal  to  20  lb.  per  ton 
of  train  weight  per  one  percent  of  grade,  or  0.3788  lb.  per  ton  of  train  weight  per 
foot  rise  per  mile. 

B  (2)  Curve  Resistance. — Curve  resistance  arises;  first,  from  the  additional  force 
required  to  change  direction  of  motion  along  a  curved  path;  second,  from  the 
slippage  of  wheels  fixed  to  a  common  axle  traversing  rails  of  different  lengths;  and 
third,  from  the  increased  and  sustained  flange  pressure.  Practice  superelevates  the 
outer  rail  to  compensate  at  least  partially  for  the  centrifugal  action  of  vehicles  as 
they  negotiate  curves  but  the  amount  of  superelevation  provided  can  be  perfectly 
adapted  only  to  one  speed  for  any  given  degree  of  curvature  and  height  of  center 
of  gravity  of  locomotive  or  car  equipment.  Curve  resistance  may  be  reduced  by 
the  use  of  rail  or  flange  lubricators,  as  disclosed  in  the  report  of  Committee  16  on 
page  iSl  in  Vol.  41  of  the  Proceedings.  Experiments  have  furnished  various  values 
for  the  allowance  necessary  for  curve  resistance  but  it  is  customarily  taken  as  0.8  lb. 
per  ton  per  degree  of  curvature  regardless  of  train  speed  except  for  locomotives 
with  their  longer  wheel  bases  and  guiding  duties  where  it  is  taken  as  two  pounds  per 
ton  of  weight  on  drivers. 

B  (3)  Acceleration  Resistance. — The  resistance  which  opposes  increase  in  speed 
of  a  vehicle  is  termed  acceleration  resistance  and,  when  expressed  in  terms  of  pounds 
per  ton,  is  dependent  only  upon  the  acceleration  rate.  From  the  basic  equation, 
F  =  ma,  where  F  is  the  force  in  pounds  required  to  accelerate  mass,  m,  at  a  rate  of 
"a"  feet  per  second  per  second,  can  be  developed  the  formula: 

F^n.iliizli. 
t 

where — '     "      ,  the  ratio  of  increase  of  speed  to  time,  represents  average  acceleration 

rate  during  time,  "f".  Here  Vi  and  Vn  are  initial  and  final  speeds,  expressed  in  miles 
per  hour  and  referred  to  time  "t"  in  seconds.  To  include  the  inertia  effect  of  rotating 
wheels  it  is  necessary  to  increase  this  value  by  an  estimated  five  percent  from  which: 

F.=  95.65  ^^  —  ^' 
t 

When  applied  to  problems  involving  electric  cars,  the  coefficient  is  increased  to  100 
in  recognition  of  the  rotational  inertia  of  traction  motor  rotors.  In  this  case: 


72  Economics   of    Railway   Location   and   Operation 

F=10Q  ^'~^' 


t 
or  F=10QA 

Where  A  =  acceleration  rate  in  miles  per  hour  per  second,  if  it  is  desired  to 
express  F  directly  in  terms  of  acceleration. 

B  (4)  Wind  Resistance. — Adverse  natural  winds  increase  the  resistance  of  trains 
at  a  rate  which  varies  approximately  with  the  square  of  the  speed.  Early  investi- 
gators of  train  resistance  ignored  this  source  of  power  consumption  or  interpreted  it 
quite  inaccurately  as  is  evidenced  by  the  omission  of  any  term  containing  the  second 
power  of  speed.  Wind  resistance  differs  from  the  resistance  of  trains  in  still  air  only 
in  its  possibility  of  directional  effects.  That  is,  with  a  head  wind  (zero  deg.  yaw. 
the  angle  between  the  longitudinal  a.xis  of  the  train  and  wind  direction)  the  effect 
is  only  that  of  increasing  relative  train  speed  by  an  amount  equal  to  wind  speed 
when  confronted  by  a  directly  opposing  wind  or  decreasing  the  speed  of  the  train 
relative  to  the  air  in  a  tail  wind.  As  the  direction  of  opposing  air  flow  varies  from 
0  deg.  yaw,  its  effect  is  intensified  until  the  worst  condition  is  reached  at  45  deg. 
yaw  (quarterly  wind).  Side  winds  force  wheels  against  rail  heads,  thereby  increasing 
flange  pressure  and  its  accompanying  flange  friction  a  measurable  amount.  Wind 
tunnel  tests  conducted  in  recent  years  have  been  of  great  value  in  comparing  one 
vehicle  contour  against  another;  the  advantage  of  various  expedients  such  as  shroud- 
ing, recession  of  protruding  accessories,  etc.,  having  been  determined. 

A  study  of  the  numerous  train  resistance  formulas  written  in  an  effort  to  accurately 
predict  requirements  of  a  given  train,  well  indicates  improvement  in  the  understanding 
of  all  the  elements  involved.  It  has  been  noted  that,  in  many  cases,  early  equations  con- 
tain no  term  variable  with  the  second  power  of  vehicle  speed.  Sometimes  no  effort  was 
made  to  associate  the  general  equation  with  variable  speed,  and  the  effect  of  average  car 
weight  was  neglected.  Representative  equations  and  their  sponsors  are  listed  below. 
These,  of  course,  are  not  recommended  for  use  but  are  presented  as  of  historical  interest, 
illustrative  of  the  refinements  incorporated  in  present-day,  accepted  formulas  when 
viewed  in  the  light  of  their  predecessors. 

Train  Resistance  Formulas 

R  ■=.  resistance  in  pounds  per  ton 
Ri  =.  resistance  in  pounds  (total) 
iJa  =  air  resistance  in  pounds 
Rm  =:  machinery  resistance  in  pounds 

F  =  speed  in  miles  per  hour 

W  =  weight  of  train  in  tons 

C  =  number  of  cars  in  train 

A  <=  frontal  area  in  square  feet 
Wa  =  weight  per  axle  in  tons 

n  =  number  of  axles 

P  =  weight  of  power  unit  in  tons 

T  =  weight  of  trailing  unit  in  tons 

Z,=  length  of  train  in  feet 

G  =  perimeter  of  cross-section  in  feet 

t  =  weight  on  drivers  in  tons 

wi  ^  number  of  driving  axles 

t' :=  total  weight  of  locomotive  and  tender  in  tons 

n'  =  total  number  of  locomotive  and  tender  axles 


Economics    of    Railway    Location    and    Operation                73 

Source 

Formula                                               Notes 

D.  K.  Clark 

/2  =  7.2  +  0.0053  F'                                           Date:  1855 

Baldwin 

0 

Engineering  News 

R  =  2+  il 
4 

Freight 

Baltimore  &  Ohio 

(1          11      (( 

Rt  =  2.2W+  122C  ]                                        Temp,  above  35'  F. 
Rt  =  3.0W-{-  137C  f  Speed  range                         "       bet.  20°  &  35°  F. 
Rt=4.0W+  1S3C  f  7-35m.p.h.                           "         "       0°  &  20°  F. 
Rt  =  SAW  +  171C  )                                              "      below  0°  F. 

S.  L.  Cluett 

R  —  5  4  4- OOOIF^-!-                                               Emntv    nri 

(v  -\-  6) 

S.  L.  Cluett 

R  —  3  8  4-0  0076F'  -1-        ^^'^                           Loaded  car" 

E.   C.  Schmidt 

W+  1 

Kiesel 

/?.  =  lOOC -f  l.SPF -^  0.01F(F-f  16)  VPFC 

Passenger 

C.B.&Q. 

R=.2.S+    '" 
468 

P.  R.R. 

R  —  3  +  0.1315  F 

General  Electric 

i?  -  5°  +  0.03F  +  0-°02T'\4  f  1  +  C  -  n 

w             ^     w       V   ^    10    ^ 

Blood 

R  —  3  +  0.12V  +  ^0.0014  +  °"^^  \  F'* 

Cole 

i?— 5.4+0.002  (F— 15)' -^         ^°° 

^    (7+2)=' 

Davis 

/?-4  +  0.13F+0-^^^'7l+^-l^ 
PF     V             10     / 

Mailloux 

/?- 3.5  +  0.15  F  +  (002C  + 0.25  \^. 

Westinghouse 

^_          F       lOV- 
10^36TF 

Pullman 

p_    9A           12.5        0.03F(3P+r)  +  . 00095  ^F' 

VWa    "^        PFa      +                                       W.n 

.0000095  V-^  G  F'°^ 

W.n 


C.M.St.P.&P. 

i?  =  18.7f +  80«. +  2.6r+  : 

Kiesel 

/?m=  [22  +  0.15(77,—  l)F]i 

Air  Resistance 

Gcss 

R.  =  0.1V' 

Gcss 

R^  =  o.nv^ 

Gcss 

R.  =  0.C01V' 

Goss 

R.  =  0.00026F' 

Goss 

^.  =  0.0001F' 

Machinery  friction  only 


Head  end 

Locomotive  and  tender 
First  car 
Last  car 
Intermediate  car 


74 Economics   of   Railway   Location   and   Operation 

Various  investigations  of  train  resistance  components  have  been  conducted  to  eval- 
uate the  effects  of  the  following  variables: 

1.  Curve  resistance  as  modified  by  rail  lubrication 

2.  Rail  weight 

3.  Curve  resistance  as  affected  by  train  speed 

4.  Temperature  of  the  air 

5.  Track  construction 

6.  Car  weight 

7.  Locomotive  contour 

8.  Passenger  train  contour 

9.  Air  conditioning 
10.  General  formulas 

1.  Rail  Lubrication  (Reported  in  AREA  Proceedings,  Vol.  41,  page  151) 

Prior  to  the  installation  of  mechanical  lubricators  on  the  Denver  &  Salt  Lake,  a 
test  train  was  made  up  and  a  series  of  tests  was  run,  maintaining  comparable  speeds,  on 
the  unlubricated  curves.  Subsequent  to  the  installation  of  the  lubricators,  and  after  the 
track  section  had  been  in  operation  for  a  period,  another  series  was  run  with  the  same 
test  train  to  determine  the  reduction  in  curve  resistance  effected  by  lubrication  of  the 
rails  and  flanges.  It  was  found  that  the  reduction  approximated  50  percent,  as  follows: 

Curve  Resistance  per  Degree 

in  Pounds  per  Ton 

Average        Maximum 

Before  lubrication  O.S52  0.79 

After  lubrication   0.274  0.422 

Reduction    0.278  

Percent  reduction    S0.4  .... 

The  test  train  consisted  of  a  dynamometer  car,  4  cars  loaded  with  coal,  25  empty 
gondolas,  and  a  caboose,  total  weight  899  tons. 

2.  Rail  Weight  and  Condition  (Reported  in  AREA  Proceedings,  Vol.  31,  page  1524) 

These  tests  were  conducted  by  the  Kansas  City  Southern  to  determine  resistance  on 
two  weights  of  rail  laid  upon  the  same  roadbed.  New  sections  of  85  and  127-lb.  rail  were 
used  along  with  85-lb.  old  rail.  The  three  types  were  laid  consecutively  on  main  line 
roadbed.  One  series  of  tests  was  conducted  with  rail  laid  in  the  following  order:  8S-lb. 
old  rail;  127-lb.  new  rail;  followed  by  85-lb.  new  rail.  The  positions  of  the  new  rails 
were  then  interchanged  and  another  series  was  run,  the  worn  85-lb.  rail  being  retained 
in  its  original  position  as  a  check  on  the  constancy  of  factors  other  than  rail  section 
weight.  New  and  worn  wheels  were  tested  in  this  manner  except  that  the  second  series 
was  made  only  with  new  wheels.  The  test  train  consisted  of  four  loaded  gondolas  and 
a  dynamometer  car,  the  locomotive  being  detached  from  the  cars  before  test  was  made 
and  after  journals  had  been  initially  warmed.  The  following  conclusions  were  drawn: 

(1)  The  127-lb.  rail  exhibited  0.3  lb.  per  ton  less  resistance  than  the  85-lb.  rail 
throughout  the  7-19  m.p.h.  speed  range 

(2)  Worn  wheel  resistance  proved  to  be  greater  on  new  rail  than  on  old  rail  of  the 
same  weight  (is  not  supported  by  data  below) 

(3)  Worn  wheel  resistance  was  greater  on  new  127-lb.  rail  than  on  new  8S-lb.  rail 
(see  (1)  above  and  table  below) 

(4)  No  difference  was  observed  in  train  resistance  between  worn  and  new  wheels 
on  rail  which  had  been  worn  to  fit  the  worn  wheel  contour  (see  table  below) : 


New  Wheels 

Speed        Resistance 

m.p.h.      Lb.  per  Ton 

Worn  Wheels 

Speed        Resistance 

m.p.h.      Lb.  per  Ton 

14.8                3.8 
15.7                3.7 
17.0               4.5 

14.8                4.3 
15.7                5.1 
17.0                4.5 

Economics   of    Railway    Location   and   Operation  75 


Test 
Section  Rail 

1  New  85  lb. 

2  New  127  lb. 

3  Worn  85  lb. 

An  investigation  to  determine  why  old  rails  were  causing  more  resistance  than  new 
contours  on  new  rail  developed  the  following: 

(1)  A  wedging  action  is  set  up  between  worn  wheel  treads  and  new  rail,  since  the 
wheel  treads  are  worn  to  a  shorter  radius  of  curvature  than  that  of  the  new 
rail  head 

(2)  Two  distinct  areas  of  contact  and  pressure  at  different  wheel  circumferences  on 
the  hollowed  wheel  treads  result  in  sUppage  at  one  or  both  areas  and  consequent 
resistance 

(3)  Contact  areas  at  different  wheel  circumferences  on  the  two  wheels  of  a  single 
axle  result  in  slippage  at  one  or  all  areas  and  consequent  resistance 

(4)  Contact  areas  of  new  rails  on  worn  wheels  were  found  to  be  on  the  unworn 
and  unpolished  part  of  the  wheel  in  some  instances 

It  was  concluded  that  probably  (3)  was  the  only  factor  of  any  consequence. 

3.  Train  Speed  on  Curves  (Reported  in  University  of  Illinois  Bulletin  No.  92, 
September,  1916) 
A  28-ton,  electrically  propelled,  car  was  used  in  these  tests.  The  test  car  was  run 
first  in  one  direction  and  then  in  the  other  over  one  of  the  curves  and  its  adjacent  tangent. 
The  curves  varied  in  degree  from  2  to  14J4  with  superelevation  of  0.75  to  5.9  in.,  re- 
spectively, on  the  extreme  curves.  By  operating  in  both  directions  consecutively,  and  on 
curved  and  tangent  track,  under  like  conditions,  it  was  possible  to  very  nearly  eliminate 
wind  effects  and  to  obtain  a  direct  measure  between  tangent  and  curved  track  resistance. 
It  was  observed  that  curve  resistance  varied  directly  with  car  speed  and  degree  of  curva- 
ture and  it  was  possible  to  write  the  following  equation  for  curve  resistance  in  pounds 
per  ton: 

i?c  =  0.058  5C 

where,     S  =  speed  in  miles  per  hour 
C  =  curvature  in  degrees 

The  report  points  out  the  danger  involved  in  extending  the  use  of  this  equation 
beyond  the  conditions  of  the  test.  That  is,  train  speed  above  40  m.p.h.,  curvature  greater 
than  IS  deg.,  and  cars  exhibiting  design  features  differing  widely  from  those  of  the  test 
car:  56,000  lb.  in  weight,  carried  on  two,  four-wheel  trucks,  spaced  23  ft.  3  in.,  center  to 
center,  truck  wheel  base,  6  ft.  4  in.,  and  self-propelled  with  four,  SO-hp.  motors. 

Tests  reported  in  University  of  Illinois  Bulletin  No.  74  developed  a  resistance  formula 
for  level  tangent  operation  which,  when  combined  with  the  foregoing  equation,  provides 
the  following  for  total  car  resistance  on  a  level  curve  at  uniform  speed,  expressed  in 
pounds  per  ton: 

R  =  4  +  0.222  S  +  QQQ^^^  AS*  ^  Q  Qgg  ^  ^ 
W 

where,  A  =  cross  sectional  area  of  car  in  square  feet 
W  =1  weight  in  tons 
and  other  units  are  expressed  as  above. 


76 Economics   of    Railway    Location   and   Operation 

4.  Temperature  (Reported  in  University  of  Illinois  Bulletin  No.  59,  May,  1912) 

The  temperature  of  a  cold  journal  is  gradually  increased  as  the  vehicle  which  it  is 
supporting  is  moved  until,  after  a  certain  distance  has  been  traversed,  it  has  reached  its 
maximum  or  equilibrium  temperature  for  the  speed  operated.  This  equilibrium  temper- 
ature is  higher  in  value  and  is  reached  in  a  shorter  distance  as  atmospheric  temperature 
increases.  The  tests  indicated  that  in  cold  weather  and  at  the  speeds  operated,  12,  IS,  17, 
and  21  miles  per  hour,  the  maximum  temperatures  and  minimum  resistance  values  were 
reached  35  miles  distant  from  the  starting  point  of  the  test,  constant  speed  being  main- 
tained throughout  the  run. 

Train  Resistance — Pounds  per  Ton 
(Average  Car  Weight  =  17.2  Tons) 
Temp.:  64°  to 
Speed  80°,  Start  to  Temperature :  30°  to  42°,  Start  to  End  of  Test 

m.p.h.  End  of  Test  35  Miles  From  Start    5  Miles  From  Start 

12     8.0  10.0  13.7 

14     8.25  10.4  13.9 

16     8.S  10.9  14.3 

18     8.75  11. S  15.0 

20     9.0  12.1  15.9 

21     9.1  12.4  16.4 

Train  Resistance — Pounds  per  Ton 
(Average  Car  Weight  =  17.2  Tons — Temperature: 
Miles  30°  to  42°  Start  to  End  of  Test  Runs) 

From  Start  12.0m.p.h.      IS.O  m.p.h.      17.25  m.p.h.      21.3m.p.h. 

4  14.1 

8  12.5 

12  11.3 

16  10.7 

20  10.4 

24  10.2 

28  10.1 

32  10.05 

36  10.0 

5.  Track  Condition  (AAR  Passenger  Locomotive  Tests — October,  1938) 

The  results  of  AAR  passenger  train  resistance  tests  presented  in  the  following  table 
were  obtained  with  a  16-car  test  train  consisting  of  14  coaches,  one  baggage  and  one 
dynamometer  car,  all  carried  on  four-wheel  trucks  with  conventional  friction  bearings, 
average  car  weight,  62.82  tons  for  a  total  trailing  weight  of  1,005  tons.  The  identical 
train  was  operated  in  moderately  warm  weather,  50  to  88  deg.,  and  in  wind  whose 
velocity  varied  from  2  to  19  miles  per  hour,  over  the  tracks  of  the  three  railways  indi- 
cated. The  rail  weight  on  the  Pennsylvania  was  131  lb.  per  yd.,  and  on  the  other  rail- 
ways was,  in  general,  100  lb.  per  yd.  A  short  stretch  of  the  Union  Pacific  was  laid  with 
110-lb.  rail.  Results  obtained  from  applying  the  Davis  formula, 

/?=  1.3 +  —+ 0.03  V -f-5:51iZ!    (see  page  85) 
W  Wn        ^       ^  ^        > 

are  included  for  comparative  purposes.  In  fact,  the  AAR  report  recommends  its  use  as 
representative  of  the  results  obtained  during  the  road  trials. 


14.7 

13.0 

13.5 

14.5 

11.8 

12.4 

13.6 

11.2 

11.8 

13.1 

11.0 

11.5 

12.8 

10.8 

11.4 

12.7 

10.75 

11.35 

12.6 

10.65 

11.3 

12.5 

10.6 

11.25 

12.5 

lin  Car  Resistance — Pounds  per  Ton 

C.&N.W. 

U.P. 

Davis 

5.9 

6.3 

7.2S 

7.9 

7.35 

8.6 

8.8 

8.4 

10.0 

9.7 

9.7 

11.35 

10.6 

11.15 

11.5 

12.7 

Economics   of    Railway    Location    and   Operation  77 

Speed  Passenger  I 

tn.p.h.  Pennsylvania 

50    5.55 

60    6.3 

70    7.35 

80    8.6 

90    9.95 

100    

It  is  interesting  to  note  the  graphical  representation  of  these  data.  Whereas  some 
components  of  train  resistance  are  confidently  expected  to  vary  with  the  square  of  vehicle 
speed,  curves  of  the  North  Western  and  Union  Pacific  resistance  values,  as  plotted  in  the 
committee  report,  are  straight  Unes  of  different  slope,  intersecting  at  74  miles  per  hour. 
The  Union  Pacific  values  are  lower  for  speeds  above  that  figure.  The  shape  of  the  Penn- 
sylvania curve  closely  follows  that  obtained  by  use  of  the  Davis  formula  but  presents 
values  approximately  one  pound  per  ton  less  than  those  calculated.  The  known  difference 
in  rail  weight,  and  a  possible  difference  in  roadway  construction,  could  very  well  explain 
the  difference  in  absolute  values  at  given  speeds,  but  it  is  difficult  to  explain  the  straight 
line  characteristics  and  widely  varying  slopes  of  the  curves  obtained  by  tests  on  the 
Union  Pacific  and  North  Western.  The  slope  in  each  case  represents  the  analyst's  judg- 
ment in  the  averaging  of  points. 

6.  Equipment  Weight  (Reported  in  University  of  Illinois  Bulletin  No.  43,  May,  1910) 
The  purpose  of  the  road  tests  reported  in  this  bulletin  was  the  determination   of 
train  resistance  values  as  they  vary  with  average  car  weight  and  train  speed.  The  results, 
empirical  in  nature,  should  be  used  only  within  the  following  limits: 

Tangent  level  track 

Air  temperature  above  30  deg. 

Wind  velocity  not  over  20  m.p.h. 

Train  in  motion  sufficiently  long  to  warm  journals 

Train  speed  between  5  and  40  miles  per  hour 

The  following  equation  is  presented  as  approximating  the  values  of  the  tests: 


R 


_   5-f  39.6  — 0.031  ty 
4.08 -f  0.152  TT 


\ 


where,  R  =  train  resistance  in  pounds  per  ton 
S  =  train  speed  in  miles  per  hour 
W  =  average  car  weight  in  tons 

This  equation  has   been  spot  checked  against   the   test  results   from  which  it  was 
derived,  with  the  following  results: 

S  W  R  Measured  R 

5  20  6.18    6.8 

10  30  5.65    5.8 

IS  40  5.25    5.1 

20  SO  4.98    4.6 

25  60  4.75    4.4 

30  70  4.57    4.5 

35  60  S.S      5.4 

40  50  6.7      6.8 

25  30  7.38    7.4 

K    IS  SO  4.55    4.2 

^L     S  70  2.88    3.1 

I 


Error  in  R 

Percent  Error  in  R 

—0.62 

—9.0 

—0.15 

—2.6 

+0.15 

+  2.9 

-f-0.38 

+8.3 

+0.35 

+8.0 

+0.07 

+  1.6 

+0.10 

+  1.9 

—0.10 

—1.5 

—0.02 

—0.27 

+0.35 

+8.3 

—0.22 

—7.1 

78 


Economics    of    Railway    Location    and   Operation 


For  more  accurate  results,  the  following  equations  are  given  for  the  several  car 
weights  listed: 

Car  Weight, 

Tons  Resistance  Values,  R,  in  Lb.  per  Ton 

IS    7.15  +  0.08S  S  +  0.00175  5' 

20    6.30  +  0.087  S  -f  0.00126  5' 

25    5.60  +  0.077  S  +  0.00116  5' 

30    5.02  +  0.066  S  +  0.00116  5* 

35    4.49  +  0.060  S  +  0.00108  5' 

40   4.15  +  0.041  S  +  0.00134  5' 

45    3.82  +  0.0315+0.00140  5' 

50    3.56  +  0.024  5  +  0.00140  5^ 

55    3.38  +  0.016  5  +  0.00142  5^ 

60    3.19  +  0.016  5  +  0.00132  5' 

65    3.06  +  0.014  5  +  0.00130  5' 

70    2.92  +  0.021  5+  0.00111  5' 

75    2.87  +  0.019  5  +  0.00113  5' 


Using  these  equations  for  the  same  resistance  calculations  as  above: 


W 


R 


5 

20 
30 
40 
50 
60 
70 
60 
50 
30 
SO 
70 

6.77     

68 

in 

5.8       

58 

t; 

5.07     

S.l 

?n 

4.6       

46 

?5 

4.42     

4.4 

sn 

4.55     

45 

SS 

5.37     

5.4 

40 

6.76     

. . .    .         68 

?5 

7.4       

7.4 

t; 

4.24     

4  2 

5 

3.05     

3.1 

Percent 

Error  in  R 

Percent 

Based  Upon 

rror  in  R           Error  in  R 

General  Equa. 

—0.03 

—0.44 

—9.0 

0 

0 

—2.6 

—0.03 

—0.59 

+2.9 

0 

0 

+8.3 

+0.02 

+0.45 

+8.0 

+0.05 

+  1.11 

+  1.6 

—0.03 

—0.56 

'+1.9 

—0.04 

—0.59 

— 1.S 

0 

0 

—0.27 

+0.04 

—0.95 

+8.3 

— O.OS 

—1.61 

—7.1 

Average 

0.57 

4.68 

Maximum 

—1.61 

—9.0 

Minimum 

0 

—0.27 

7.  Locomotive  Contour  (Reported  by  J.  J.  Green,  junior  research  physicist.  National 
Research  Laboratories  of  Canada,  under  the  title,  "The  Wind  Tunnel  De\'elopment  of 
a  Proposed  External  Form  for  Steam  Locomotives") 

In  1931,  at  the  request  of  the  Canadian  National  Railways,  the  National  Research 
Laboratories  initiated  an  investigation  of  air  flow  around  a  steam  locomotive  with  several 
objectives  in  view.  Contemporary  design  was  such  that  smoke  from  the  stack  swept  back 
over  the  boiler  and  downward  in  front  of  the  cab  windows,  seriously  impairing  vision, 
and  it  was  the  purpose  of  the  study  to  evolve  a  contour  which  would  correct  this  con- 
dition to  the  greatest  practicable  degree  and  at  the  same  time  offer  the  least  resistance  to 
air  flow  compatible  with  economical  design  and  operating  requirements.  A  model  of  the 
then  current  locomotive  design  was  tested  in  a  wind  tunnel  along  with  various  modified 
forms  to  determine  which  would  provide  the  nearest  approach  to  the  objectives  desired. 
The  following  results,  valuable  for  comparative  purposes  only,  were  obtained  during  the 
tests;  R  being  defined  as  drag  of  the  model  in  pounds  as  measured  in  the  wind  tunnel, 
while  V,  is  the  speed  expressed  in  miles  per  hour. 


Economics   of   Railway   Location   and   Operation 79 

Relationship 
Modification  R/V'XIOO 

Original  unmodified  model  0.1089 

1.  Shrouding  fitted  below  running  boards  and  extending  down  to  level  of 
the  bottom  of  pilot  and  from  pilot  to  rear  of  cab.  Solid  pilot  added  along 

with  sloping  sheet  from  top  of  pilot  to  bottom  of  smoke  box 0.1088 

2.  Same  as  (1)   plus  shroud  extended  along  tender  from  runways  to  same 

lower  level,  front  to  rear  of  tender  0.1036 

3.  Same  as  (2)  except  feedwater  heater,  head  lamp,  and  side  staircases  re- 
moved, with  an  approximately  hemispherical  front  to  smoke  box 0.0763 

4.  Same  as  (3)  with  whistle  and  bell  removed,  and  metal  cowling,  flush  with 
the  center  of  the  cab  roof  and  having  the  same  roof  contour  but  vertical 
sides,  was  fitted  over  the  turrets,  valves  and  dome  extending  from  the  cen- 
ter of  the  sand  dome  0.0710 

5.  The  front  of  the  metal  cowling  added  in  (4)  was  sloped  down  in  a  gentle 
curve  to  the  top  of  the  boiler  just  behind  the  stack  and  a  streamlined  tail 

was  added  to  the  stack  0.0698 

6.  Same  as  (5)  with  cowling  conforming  to  the  cab  roof  fitted  over  the  entire 
tender    0.0666 

7.  Same  as  (6)  with  space  between  cab  and  tender  closed  by  cowling  flush 

with  the  sides  and  roof  of  cab  0.C656 

8.  Same  as  (7)  except  that  the  front  of  the  cab  was  modified  to  slope  back- 
ward from  the  running  board,  and  the  overhang  of  the  cab  roof  was  elim- 
inated. Various  fillets  and  curves  were  employed  to  eliminate  corners  and 

sharp  edges   0.0620 

9.  Cowling  on  top  of  boiler  extended  two  inches  past  front  of  boiler  and  its 
sides  dropped  down  to  the  rounded  nose.  The  two  sides  of  the  cowling 
were  opened  out  to  give  a  flared  entrance,  and  a  slot  was  cut  where  it 
butted  on  to  the  old  cowling  in  order  to  allow  exit  for  air  caught  in  front 
of  the  stack.  Side  plates  were  fitted  to  the  cab  so  that  they  protruded  for- 
ward a  short  distance  from  the  cab  front.  All  this  was  done  in  an  effort 

to  prevent  smoke  from  interfering  with  vision  0.0727 

10.  Two-inch  extension  added  in  (9)  removed 0.068S 

11.  Leaving  the  sides  of  the  extended  cowling  untouched  on  either  side  of  the 

stack,  the  forward  portion  of  the  roof  was  removed 0.066S 

12.  Front  ends  of  running  boards  were  rounded  off  to  remove  sharp  corners 

and  gap,  stack  to  curved  surface  to  cowling,  reduced 0.06S4 

13.  Cylindrical  surface  added  between  rounded  nose  of  the  boiler  and  the 
sloping  front    0.0647 

14.  Because  of  operating  restrictions,  cowling  was  removed  from  over  water 

tank  and  runways  at  the  sides  of  coal  bunker 0.0633 

15.  For  the  same  reason,  modification  of  full  shrouding  was  necessary  and,  as 
a  measure  of  the  contribution  of  shrouding,  several  modifications  were 
examined: 

(a)  Full  shrouding   0.0633 

(b)  Shrouding  removed  below  the  level  of  driving  wheel  centers  and  from 
behind  cylinders  to  the  center  of  the  rear  driving  wheel 0.0650 

(c)  Shrouding  removed  below  the  level  of  driving  wheel  centers  from  the 

rear  of  the  cylinders  to  the  rear  of  the  cab 0.0656 

(d)  Shrouding  completely  removed  from  the  rear  of  the  cylinders  to  the 

rear  of  the  cab   0.0695 

(e)  Shrouding  removed  below  the  level  of  the  top  of  the  driving  wheels 

from  rear  of  cylinders  to  rear  of  cab   0.0702 

(f )  Tender  shrouding  removed  below  level  of  frame 0.0715 

(g)  Shrouding  completely  removed  from  locomotive  0.0846 

(h)  Shrouding  completely  removed  from  locomotive  and  tender 0.0865 

These  results  show  how  very  vital  shrouding  is  when  the  rest  of  the  model 

is  streamlined,  yet  the  addition  of  shrouding  to  the  original  otherwise  un- 
modified model  had  practically  no  effect  on  resistance.  Model  15(f)  was 
selected  as  the  most  practical,  considering  operating  restrictions. 


80 Economics   of    Railway    Location   and   Operation 

Relationship 
Modification  R/V^  X  100 

16.  To  simplify  the  front  end,  a  sloping  solid  pilot  running  in  one  plane  from 
as  near  the  rail  level  as  possible  up  to  the  running  boards  was  substituted 

for  the  original  arrangement.  Otherwise  same  as  lS(f)  above 0.0700 

17.  Bell  was  placed  in  front  of  stack  with  its  supporting  frame  parallel  to  the 
longitudinal  axis  of  the  locomotive 0.0706 

It  will  be  noted  that  the  value  of  R/V^  X  100,  a  reasonable  measure  of  the  com- 
parative resistance  characteristics  of  various  full  scale  locomotive  designs,  was  reduced 
from  0.1089  to  0.0706,  or  35  percent.  This  was  accomplished  with  no  interference  to  oper- 
ating requirements.  Had  it  not  been  necessary  to  respect  such  considerations,  a  reduc- 
tion of  43  percent  to  0.0620  could  have  been  effected.  It  is  important  that  recognition 
be  given  the  fact  that  a  single  modification  may  be  of  little  value  when  applied  by  itself 
but,  when  applied  to  a  locomotive  otherwise  streamlined,  the  saving  may  be  considerable. 
The  shrouding  of  the  running  gear  of  the  test  model  is  a  case  in  point.  Also  of  interest 
is  the  fact  that  no  effect  was  discernible  from  closing  the  gap  between  cab  and  tender 
with  its  implication  of  the  questionable  advantage  of  closing  the  gap  between  the  coupled 
cars  comprising  the  trailing  load. 

8.  Passenger  Train  Contour  (New  York  University  Wind  Tunnel  Test  Results) 

In  1934,  a  comprehensive  series  of  wind  tunnel  tests  was  jointly  sponsored  by  The 
American  Locomotive  Company,  the  American  Car  and  Foundry  Company,  and  the 
Brill  Company.  These  experiments  were  conducted  in  the  laboratories  of  New  York 
University  under  the  direction  of  Professor  Alexander  Klemin  and  data  have  been  re- 
leased by  the  sponsors.  Models  of  standard  railway  motive  power  and  rolling  stock  were 
examined  along  with  models  of  streamhned  equipment  with  various  nose,  tail  fairing 
and  enclosure  shroud  forms.  These  variations  are  noted  below  in  connection  with  the 
presentation  of  equations  applicable  to  the  several  test  models. 

Air  Resistance  Formulas  for  Trains  Operating  in  Still  Air 

Power  Car  Trains 

Open  skirts  (18  in.  from  skirt  to  top  of  rail): 


Air  drag  =  0.00224  pJJ^V'  V'-^-^KV^ 
\  100  / 

Closed  skirts  (completely  under  car) : 

Air  drag  =  0.0020  pJ-L^V'  V'+'^KV 
V  100  / 


Where: 

P  =  Perimeter  of  car,  in  feet,  from  plane  of  top  of  rails  over  car  to  plane  of 

top  of  rails 
L  =  Overall  length  of  train  in  feet 
V  =  Speed  of  train  in  m.p.h. 
Sir  =  Summation  of  factors  (Ki  -\-  K2  +  etc.)  of  the  various  items  whose  drag 

depends  on  other  dimensions  than  perimeter  and  length 
^1=  Factor  for  power  car  nose  shape: 

For  nose  bluntly  streamlined,  Ki  =  -f  0.000036  X  cross-sectional  area  of 
nose  at  full  section,  including  trucks,  in  square  feet 
For  nose  well  streamlined,  Ki  =  0 
K2=  Factor  for  tail  shape: 

For  tail  bluntly  streamlined,  /iTz  =  ^-0.000061  X  cross-sectional  area  of 
tail  at  full  section,  including  trucks,  in  square  feet 
For  tail  well  streamlined,  ^^^2  =  0 


Economics   of    Railway   Location    and    Operation  81 

iC«=  Factor  for  power  car  trucks: 

For  two  faired  trucks,  A'3  =  0 

For  two  unfaired  trucks,  Kz  =  +0.0099  (This  factor  is  large  because, 
as  tested,  the  truck  fairings  formed  part  of  the  nose  and  slart  fairing, 
and  when  the  truck  fairings  were  removed  the  nose  and  skirt  shape  was 
damaged.  On  designs  in  which  the  truck  fairings  do  not  interfere  with 
the  nose  or  skirt  contours,  K3  =  +0.00026) 

Ki=  Factor  for  fairing  trailing  car  trucks  on  streamhned  trains  (as  tested, 
neither  the  trucks  nor  the  fairings  interfered  with  the  continuity  of  the 
open  skirts) : 

For  faired  trucks,  Kt  =  — 0.00013  X  number  of  traiUng  car  trucks 
For  unfaired  trucks,  Kt  z=  0 

Ks'=  Factor  for  diaphragm  shape: 

For  smooth  diaphragms,  Ks  ^  0 

For  cowled  diaphragms,  Ks  =  +0.000037  X  ^c  X  number  of  dia- 
phragms 

Ke=  Factor  for  bulge  of  power  car: 

For  no  bulge  (as  tested),  Ka  =^  0 

For  a  bulge  of  good  streamline  shape,  Ke  =  +0.00032  X  cross-sectional 
area  of  bulge  in  square  feet  (in  order  for  this  coefficient  to  apply,  the 
bulge  must  be  of  such  a  character  that  it  has  a  streamline  shape  as  good 
as,  or  better  than,  the  power  car  itself) .  Under  this  heading  may  be 
classed  bulges  that  are  merely  expansions  of  the  general  power  car  con- 
tours, as  well  as  local  bulges  having  well  streamhned  noses  and  tails. 
For  a  bulge  of  relatively  poor  streamline  shape,  Ka  =  +0.00051  X 
cross-sectional  area  of  bulge  in  square  feet  (this  coefficient  applies  where 
the  bulge  has  relatively  poor  shape,  such  as  sharp  edges  or  corners,  blunt 
tail,  a  blunt  nose,  etc.) 

Streamline  Locomotive  Trains 

With  open  skirts  on  cars  (18  in.  from  skirt  to  top  of  rail) 

Air  drag  =  r 0.023  Li. i+2/i:L+0.00l73Sp/j^y-''+2ii:c1  F" 

With  closed  skirts  on  cars  (completely  under  cars) 

Air  drag  =  I" 0.023  U i  +  S/Tl  +  0.001535 ^c(— )  "''  +  ^K^  F' 

Where: 

F  =  Train  speed  in  miles  per  hour 
Z,L  =  Length  of  locomotive  and  tender  in  feet 
Lc  =  Length  of  car  consist,  in  feet,  rear  of  tender  to  rear  of  train 
Pc  =  Perimeter  of  cars,  in  feet,  from  plane  of  top  of  rails  over  car  to  plane  of 
top  of  rails 
2/Cl  =  Summation  of  factors  of  the  various  items  affecting  the  locomotive  and 
tender,  whose  drag  depends  on  other  dimensions  than  those  given  above: 
K-,=:  Factor  for  wheel  shrouds  on  streamline  locomotives: 

For  closed  shrouds  (all  wheels  completely  enclosed),  Kt  =  0 
For  open  shrouds  (2-ft.  by  2-ft.  6-in.  inspection  openings  over  the  driv- 
ing wheel  journals),  K^  z=  +0.0005  X  total  number  of  openings 
For  short  shrouds    (driving  wheels  and  tender  trucks  completely  ex- 
posed), Ki  =  +0.0182 
Ka^  Factor  for  nose  shape  on  streamline  locomotive: 
For  helmet  nose,  Ks  ^  0 
For  straight  nose,  /iTs^i +0.0021 
For  round  nose,  A'g  z=  +0.0026 
Kt=z  Factor  for  boiler  shape  on  streamline  locomotive: 
For  round  top,  As  =  0 

For  cowled  top  (domes  and  fittings  enclosed  in  longitudinal  cowl  above 
boiler  shroud),  Ks  =  +0.0035 


82 


Economics   of    Railway    Location    and    Operation 


'^K^  =  Summation  of  factors  of  the  various  items  affecting  the  cars,  whose  drag 
depends  on  other  dimensions  than  those  given  above.  These  factors  are 
K2,  the  factor  for  tail  shape;  Ki,  the  factor  for  fairing  trailing  car  trucks 
on  streamlined  trains;  and  Kg,  the  factor  for  diaphragm  shape.  Their 
values  are  the  same  as  given  under  the  formulas  for  power  car  trains 

The  first  two  terms  in  the  brackets  of  the  drag  equations  for  streamUned  locomo- 
tive trains  are  functions  of  the  locomotive  and  tender  only,  while  the  last  two  terms  are 
functions  of  the  car  consist  only. 

Standard  Locomotive  Trains — New  York  Central  4-6-4  Type 


Air  drag  =  fcOSS  Lj  +  0.0031  i>„  /' A-VO  p 


Where: 

V  =  Train  speed  in  miles  per  hour 
Ll  =  Length  of  locomotive  and  tender  in  feet 

Z,„  =  Length  of  car  consist,  in  feet,  rear  of  tender  to  rear  of  train 
P^  r=  Perimeter  of  cars,  in  feet,  from  plane  of  top  of  rails  over  car  to  plane  of 
top  of  rails 

The  first  term  in  the  brackets  of  this  formula  is  a  function  of  the  locomotive  and 
tender  only,  while  the  second  term  is  a  function  of  the  car  consist  only. 


<ui 
Kin 

OTCL 


A 

\ 

\ 

\ 

/^ 

^ 

-^ 

^ 

^ 

K 

^C 

^ 

^ 

\ 
0 

.^ 

"^ 

.3  .4  .5  .6  7 

VELOCITY     OF    GROUND    WIND 
VELOCITY    OF    TRAIN 


CURVE    a;        streamlined     LOCOMOTIVE    AND    TAIL    CAR 
USE    FOR    STREAMLINE     LOCO.     TRAINS 

CURVE    8  POWER    CAR     TRAIN  CLOSED     SKIRTS 

CURVE    C  ;  »  ..  ..  OPEN     SKIRTS 

CURVE  D         STANDARD    LOCOMOTIVE     TRAIN 

Increase  in  Drag  Due  to  Ground  Wind  at  Constant  Train  Speed 


Economics    of    Railway    Location    and    Operation 83 

Range  of  application: 

Trains  of  100  to  800  ft.  in  length — no  appreciable  error 
Trains  of  SO  to  1,500  ft.  in  length — small  error 
(Test  range:  StreamUned  trains — 143  to  411  ft. — two  to  six  cars 
Standard  trains— 96  to  330  ft.) 

The  above  equations  apply,  as  indicated,  only  in  stiU  air.  In  actual  operation,  ground 
or  natural  winds  are  always  encountered  and  it  is  necessary  in  practical  usage  to  modify 
the  values  obtained  by  application  of  the  foregoing  equations  to  include  this  effect.  This 
is  accompHshed  by  multiplying  the  air  drag  in  still  air  by  a  multipUcation  factor,  Rt>, 
which  is  read  from  the  accompanying  chart.  The  abscissa,  r,  is  the  ratio  of  ground  wind 
velocity,  Vg,  to  train  speed,  V,  so  that 

V 
and  air  drag  with  a  ground  wind  =  Rb  "X.  Do 

where  Do  =  air  drag  in  still  air  at  speed  V 

Ground  winds  are  constantly  varying  in  intensity  and  in  direction,  precluding  an 
exact  prediction  of  air  drag  to  be  overcome  in  traversing  a  given  division  with  a  given 
train.  It  is  recommended  that  the  year-round  average  ground  wind  velocity  be  employed 
as  Vg. 

9.  Air  Conditioning 

An  additional  power  demand  of  considerable  proportions  was  introduced  coincident 
with  the  air  conditioning  of  passenger  cars.  Also  to  be  satisfied,  but  of  less  magnitude, 
is  the  power  required  for  car  lighting.  To  obtain  an  accurate  value  of  the  drawbar  pull 
required  to  haul  a  given  train  of  air  conditioned  passenger  cars,  it  is  necessary  to  give 
cognizance  to  these  power  demands,  the  most  direct  method  being  to  transpose  them 
into  terms  of  train  resistance  bv  the  use  of  the  basic  formula, 


R  = 


315  hp 
WnV 


where,    R  ^  train  resistance  in  pounds  per  ton 

hp  =  horsepower 
W  =  weight  per  axle 

n  =  number  of  axles 

V  =  speed  in  miles  per  hour 

Totten  states  that  the  average  maximum  requirements  for  mechanical  or  electro- 
mechanical air  conditioning  may  be  taken  as  25  hp.  per  car  and  for  electric  hghting, 
battery  charging,  etc.,  5  hp.  per  car,  or  a  total  of  30  hp.  per  car,  at  speeds  of  30  miles 
per  hour  or  above.  The  formula  then  becomes, 

11.250 


R 


WnV 


As  a  result  of  an  extensive  investigation,  the  Division  of  Equipment  Research,  AAR. 
released  its  "Summary  Report  on  Air  Conditioning  of  Railroad  Cars",  dated  November 
24,  1936,  in  which  were  outhned,  in  part,  its  findings.  The  accompanying  table  is  derived 
from  the  power  demand  and  efficiency  values  published  therein.  It  will  be  noted  that, 
upon  a  basis  of  6-tons  refrigeration,  the  horsepower  required  at  the  axles  varies  from 
18.5  to  41.0  and,  if  one  design  is  excluded,  this  range  is  reduced  to  a  maximum  limit  of 
30  hp.,  substantiating  the  value  of  25  hp.  per  car  recommended  by  Totten. 


84 


Economics   of   Railway   Location    and   Operation 


POWER   REQUIREMENTS   OF  NINE  MECHANICAL  COMPRESSION   AIR  CONDITIONING 
SySTEMS    AT    AIR   RESISTANCE   PRESSURES   OF   ZERO    AND  0.55    INCHES    OF  WATBt 

Conditions:        6-Ton  Refrigeration 
60-Ton  Car  Weight 
Ov^erall   Efficiency   of   Drives, 
Generators,    and  Compressor  Motors: 
30  m.p.h.   =  58.5 
50  m.p.h.   =  58.8 
70  m.p.h.   =  56.9 
90  m.p.h.    =  54.6 


SYSTEM 

Alrtemp-York 
(5-ton) 

30. m.p.h. 

50        " 

70        " 

90   " 
Carrier-Safety 

30  m.p.h. 

50   " 

70   " 

90   " 
Trans 

30   " 

50    " 

70    " 

90    " 
Alrtemp-York 
(6-ton) 

30  m.p.h. 

50   " 

70   " 

90    " 
Alrtemp-York 
(7-ton) 

30  m.p.h. 

50   " 

70   " 

90   » 
&,  O.-York' 

30  m.p.h. 

50   " 

70   " 

90   " 
General  Electric 

30  m.p.h. 

50   " 

70   " 

90    " 
Prlgldalre 

30  m.p.h. 

50    " 

70    " 

90    " 
Baldwin-Sou thwark 

30  m.p.h. 

50   " 

70   " 

90   " 


^H.P.  per  Ton  of 

Refrigeration 

Zero     0.35 


Horsepower    Train  Reslstanco 

At  Axle      In  Pounds  per  Ton 
Zero    0.35    Zero       0.35 


B 


1.81     1.92 


1.98     2.10 


1.^3     2.00 


2.13^     2.21 


2.17     2.23 


2-.28     2.35 


2.45     2.55 


2.63     2.72 


3.32     3.73 


18.6 

19.7 

3.88 

4.10 

18.45 

19.6 

2.31 

2.45 

19.1 

20.25 

1.71 

1.81 

19.9 

21.1 

1.38 

1.47 

20.3 

21.55 

4.25 

4.49 

20.2 

21.4 

2.52 

2.68 

20.9 

22.15 

1.87 

1.98 

21.75 

23.05 

1.51 

1.60 

19.8 

20.5 

4.13 

4.27 

19.7 

20.4 

2.46 

2.55 

20.35 

21.1 

1.82 

1.885 

21.2 

22.0 

1.47 

1.53 

21.9 

22.7 

4.56 

4.73 

21.7 

22.5 

2.71 

2.81 

22.45 

23.3 

2.00 

2.08 

23.4 

24.3 

1.625 

1.69 

22.3 

22.9 

4.64 

4.77 

22.1 

22.7 

2.76 

2.84 

22.9 

23.5 

2.05 

2.10 

23.8 

24.5 

1.65 

1.70 

23.4 

24.1 

4.86 

5.02 

23.25 

24.0 

2.91 

3.00 

24.0 

24.8 

2.14 

2.22 

25.0 

25.8 

1.74 

1.785 

25.1 

26.2 

5.23 

5.45 

25.0 

26.0 

3.12 

3.25 

25.8 

26.9 

2.30 

2.40 

26.9 

28.0 

1.87 

1.945 

27.0 

27.9 

5.63 

5.81 

26.8 

27.7 

3.35 

3.46 

27.7 

28.7 

2.47 

2.56 

28.9 

29.9 

2.01 

2.08 

34.0 

38.3 

7.06 

7.98 

33.8 

38.0 

4.23 

4.75 

35.0 

39.3 

3.12 

3.51 

36.5 

41.0 

2.53 

2.85 

Economics   of    Railway    Location    and   Operation  85 

10.  General  Formulas  (Davis  Formulas) 

The  Davis  formulas,  generally  accepted  as  reasonably  reliable  in  predicting  resistance 
values  of  a  given  vehicle  or  combination  of  vehicles  at  the  time  they  were  written,  were 
the  result  of  a  thorough  correlation  of  existing  test  data.  More  recent  experiments  on 
current  design  types  have  indicated  to  some  authorities  the  need  for  minor  revision  of 
the  constants  employed  by  Davis,  but  the  basic  form  of  these  equations  has  not  been 
disputed  and  it  is  unlikely  that  future  experiments  will  substantially  alter  that  form. 
According  to  Davis,  total  resistance  is  comprised  of  three  primary  components;  journal, 
flange,  and  air  resistances.  The  first  is  independent  of  speed,  varying  indirectly  with 
average  axle  loading;  the  second  varies  directly  with  speed;  while  the  third,  air  resist- 
ance, varies  directly  with  vehicle  cross-sectional  area  and  the  square  of  the  speed. 
Inasmuch  as  the  combined  resistance  value,  R,  is  expressed  in  pounds  per  ton,  total  axle 
loading  is  introduced  into  the  denominator  of  the  air  resistance  term.  Then, 

R  =  1.3  +^  +  kV  +  -^^^^ 


W  Wn 

where  R  =:  resistance  in  pounds  per  ton 

W  =  average  weight  per  axle  in  tons 
k  =  constant  depending  upon  equipment 
V  =  speed  in  miles  per  hour 
C  =  constant  depending  upon  equipment 
A  =  effective  cross-sectional  area  in  square  feet 
n  =  total  number  of  axles 

Values  of  k  and  C  recommended  by  Mr.  Davis  follow: 

Equipment  k  C 

Locomotives    0.03  0.0024 

Freight  cars    0.045  0.0005 

Passenger   cars — vestibuled    0.03  0.00034 

Multiple  unit — leading  car — vestibuled    0.045  0.0024 

Multiple  unit— trailing  cars    0.045  0.00034 

Motor  cars   0.09  0.0024 

Values  of  A: 

Locomotives —  SO  tons    105  sq.  ft. 

Locomotives —  70  tons   110 

Locomotives — 100  tons  and  over  120 

Freight  cars  85-  90 

Passenger  cars  120 

Multiple-unit  cars    100-1 10 

Motor  cars — two  trucks   80-100 

Motor  cars — one  truck  70-  75 

ToTTEN  Formulas  for  Lightweight  Passenger  Trains 

Due  to  developments  in  design  subsequent  to  the  writing  of  the  Davis  formulas,  such 
as  evidenced  in  the  hghtweight,  streamlined,  articulated  trains,  Totten  recommends  sub- 
stituting the  various  air  resistance  values  developed  by  the  New  York  University  test 
results  for  the  final  term  of  the  Davis  locomotive  or  passenger  car  formula.  Therefore, 
for  locomotives  and  power  units  in  combination  with  lightweight,  four-axle,  or  artic- 
ulated cars,  the  resistance  formula  would  read, 

29 
i?  =  1.3  -|-  — -|-  0.03  V  plus  the  appropriate  air  resistance  term  selected  from  Section 

8  preceding. 


86 Economics   of    Railway    Location    and   Operation 

Conclusions 

The  Davis  equation,  with  Totten  recommended  modifications  applied  when  stream- 
lining refinement  introduces  marked  resistance  changes,  remains  the  most  reliable  and 
widely  accepted  method  for  calculation  of  train  resistance.  This  committee  proposes  to 
continue  its  search  for  road  test  data,  particularly  as  they  have  been  developed  for  freight 
service  application — to  weigh  all  factors — to  modernize  equations  of  merit  which  no  longer 
accurately  represent  present  operating  conditions — and,  if  possible,  to  submit  a  preferred 
general  method  for  calculating  train  resistance  for  guidance  in  such  matters  as  the 
establishment  of  locomotive  tonnage  ratings. 


It  is  recommended  that  this  report  be  received  as  information  and  the  committee  be 
authorized  to  continue  its  work. 


Report  of  Committee  25 — Waterways  and  Harbors 

G.  P.  Palmer,  Chairman,  R.  W.  Marye  E.  H.  Roth,  Vice-Chairman, 

D.  J.  Brumley  R.  J.  MiDDLETON  C.  U.  Smith 

Benjamin  Elkind  F.  E.  Morrow  J.  L.  Starkie 

W.  D.  Faucette  V.  B.  W.  Poulsen  A.  B.  Stone 

R.    P.    FORSBERG  W.   G.   NUSZ  W.    R.    SWATOSH 

I.  W.  Geer  a.  N.  Reece  E.  F.  Wendt 

G.  F.  Hand  P.  T.  Simons  S.  L.  Wonson 

N.  D.  Hyde  G.  R.  Smiley  Committee 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 
No  report. 

2.  Breakwaters,  bulkheads  and  jetties. 

Final  report — giving  definitions  of  "breakwater",  "bulkhead"  and  "jetty"  for  inclu- 
sion in  the  Manual page  88 

3.  Recommended  practices  to  prevent  damage  by  navigation  to: 

(a)  Bridges — movable  and  stationary; 
(b)'  Piers,  wharves  and  docks. 
No  report. 

4.  Study  of  metal  and  other  protective  casings  for  pier  structures  under  water. 
Progress  report — submitted  as  information page  88 

5.  Economic  principles  involved  in  clearance  over  navigable  waterways. 
No  report. 

6.  Seawalls  and  ocean  shore  protection,  including  effect  of  wave  action  and  ice. 
Final  report — submitted  as  information  and  adding  definition  of  "groin"  for  inclusion 

in  the  Manual page  88 

7.  Reasonable  life  of  steel  casings  immersed  in  sea  water. 

Progress  report — submitted  as  information page  90 

8.  Lands  subject  to  servitude  of  navigation  as  affecting  protection  of  roadbeds  built 
or  to  be  built  on  proposed  dam  pool  areas. 

No  report. 

The  Committee  on  Waterways  and  Harbors, 

G.  P.  Palmer,  Chairman. 


Bulletin   420.   November,    1940. 


87 


Waterways   and    Harbors 


Report  on  Assignment  2 

Breakwaters,  Bulkheads  and  Jetties 

G.  P.  Palmer    (chairman,  subcommittee),   E.  H.  Roth,  R.  P.  Forsberg,  W.   G.  Nusz, 
C.  U.  Smith. 

The  following  definitions  have  been  revised  to  conform  to  discussion  of  them  at  the 
March,  1940,  Convention  and  are  now  submitted  for  inclusion  in  the  Manual: 

Breakwater. — A  structure  to  afford  shelter  from  wave  action.  25 

Bulkhead. — A  structure  to  prevent  sliding  of  natural  ground  or  fill  material  into  the 

water;  the  hmiting  wall  or  structure  along  a  waterfront.  25 
Jetty. — A  structure  in  the  mouth  of  a  river,  at  the  entrance  of  a  harbor,  or  elsewhere, 

to  control  the  waterflow  and  currents,  to  maintain  depth  of  channel,  to  protect 

harbor  or  beach.  25 


Report  on  Assignment  4 

Study  of  Metal  and  Other  Protective  Casings  for  Pier 
Structures  Under  Water 

N.  D.  Hyde  (chairman,  subcommittee),  G.  F.  Hand,  R.  W.  Marye,  V.  B.  W.  Poulsen, 
P.  T.  Simons,  G.  R.  Smiley,  W.  R.  Swatosh. 

The  purpose  of  this  study  is  to  assemble  data  relative  to  the  use  of  protective  casings 
for  combatting  the  effects  of  marine  borers  upon  timber  structures  submerged  in  sea 
water. 

Considerable  experimental  work  has  already  been  done  and  several  shield  installa- 
tions are  under  observation.  The  principle  of  the  use  of  shields  is  based  upon  the  fact 
that  marine  borers  cannot  live  below  the  mud  line.  If  the  mud  line  is  raised  above  the 
attack  line  the  timber  is  protected  against  the  borers.  Experiments  have  been  under  way 
about  nine  years  with  encouraging  results.  A  variety  of  shields  are  commercially  available. 

The  committee  reports  progress  in  the  assembling  of  data  on  the  subject. 


Report  on  Assignment  6 

Seawalls  and  Ocean  Shore  Protection,  Including  Effect 
of  Wave  Action  and  Ice 

C.  U.  Smith  (chairman,  subcommittee),  Benjamin  Elkind,  W.  D.  Faucette,  G.  F.  Hand, 
R.  W.  Marye,  J.  L.  Starkie,  A.  B.  Stone. 

Definitions 

The  committee  has  carefully  considered  a  definition  for  the  word  "groin"  and  sub- 
mits the  following  with  a  recommendation  that  it  be  approved  for  insertion  in  the 
Manual. 

Groin. — A  barrier  extending  into  the  water  from  a  beach  to  arrest  traveling  sand  and 
shingle  and  to  give  protection  against  wave-wash  or  current.  A  small  jetty.  25 


WaterwaysandHarbors  89 

History 

An  effort  has  been  made,  merely  as  a  matter  of  information,  to  obtain  some  history 
of  seawalls  and  ocean  shore  protection.  Reference  to  this  type  of  protection  is  found  in 
connection  with  the  early  ports  of  Alexandria,  Pireu,  Rhodes  and  Antium,  but  detailed 
references  have  not  been  located.  It  must  suffice  to  say  that  seawalls  and  ocean  shore 
protection  have  existed  since  the  days  of  those  ocean  ports,  and  in  recent  years,  by 
reason  of  the  greater  economic  value  of  waterfronts,  more  consideration  has  been  given 
to  this  type  of  protection. 

Analysis 

From  a  careful  study  of  authorities  on  shore  protection,  it  may  be  said  that  such 
protection  consists  of  four  types,  namely: 

1.  Artificial  constructions  which  break  the  force  of  the  waves  before  they  reach  the 
shore. 

2.  Those  which  consolidate  and  elevate  the  shore  itself,  so  as  to  enable  it  to  resist 
the  action  of  the  waves. 

3.  Those  which  make  or  assist  the  accumulation  of  sand  or  shingle  upon  the  shore. 

4.  Permanent  breakwaters,  which  act  as  islands  in  the  offing  and  exclude  the  waves. 

To  determine  the  proper  usage  of  any  of  these  four  or  a  combination  of  them, 
requires  a  careful  investigation  into  the  various  forces  which  produce  the  conditions 
causing  shore  erosion.  In  every  instance,  such  diagnosis  or  study  should  be  completed 
before  any  protective  structures  are  placed.  In  this  connection,  the  following  are  gener- 
ally considered  as  the  four  forces  which  tend  to  cause  disintegration  of  the  shore: 

1.  Sub-aerial  agencies 

2.  Waves 

3.  Wind  currents 

4.  Tidal  currents 

These  forces  may  be  further  explained  by  the  following  brief  comments: 

Sub-aerial. — The  chief  sub-aerial  forces  in  this  connection  are  wind,  rain,  frost  and 
running  water. 

Waves. — Waves  may  be  classified  as  forced  and  free.  Forced  waves  consist  of  those 
during  the  continuance  of  the  wind  causing  them,  and  free  waves  run  for  some  time 
after  the  wind  has  subsided. 

Wind  currents. — ^These  may  be  on-shore,  off-shore,  or  along-shore  or  at  various 
angles  between  these.  Attention  is  directed  to  the  fact  that  wind  currents  along-shore 
are  most  effective  in  causing  traveling  of  sand  and  shingle.  The  use  of  groins  should  be 
thoroughly  investigated  where  this  situation  exists. 

Tidal  currents. — The  tidal  currents  to  be  investigated  are  those  which  run  parallel, 
or  approximately  so,  to  the  coast  line.  In  places  where  the  shore  hne  is  irregular  and 
small  bays  exist,  revolving  tidal  currents  are  generated.  These  are  the  principal  causes 
of  shore  erosion  and  should  be  carefully  studied  in  connection  with  any  proposed  pro- 
tection. 

By  reason  of  the  innumerable  conditions  which  may  exist,  and  by  reason  of  single 
or  combined  forces,  all  of  which  tend  to  cause  erosion  of  the  shore,  it  is  difficult  in  a 
report  of  this  character,  to  make  any  recommendation  with  reference  to  procedure, 
either  in  general,  or  at  any  given  point. 

Specific  reference  is  made  to  Paper  No.  2  of  the  Beach  Erosion  Board,  office  of  the 
Chief   of  Engineers,  Washington,   D.C.,   dated   December   1,   1938,   entitled   "Manual   of 


90 Waterways    and    Harbors 

Procedure  in  Beach  Erosion  Studies."  In  Part  7  of  this  publication,  entitled:  "Plan  of 
Improvement — Beach  and  Shore  Protection"  extending  from  pages  65  to  72  inclusive, 
with  appended  diagrams,  there  seems  to  be  a  complete  answer  to  the  assignment  of  this 
subcommittee.  This  entire  publication  and  Part  7  of  it  in  particular,  are  recommended  to 
all  those  who  have  definite  problems  of  erosion  to  cope  with. 

Bibliography 

Your  subcommittee,  in  preparing  this  report,  has  referred  to  the  official  journal  of 
the  American  Shore  and  Beach  Preservation  Association  known  as  Shore  and  Beach, 
which  contains  many  items  of  interest  in  connection  with  the  subject  matter  of  this 
subcommittee. 

In  addition  to  the  publication  Shore  and  Beach,  specific  reference  has  been  made  to 
the  following: 

Manual  of  Procedure  in  Beach  Erosion  Studies,  Office  of  the  Chief  of  Engineers, 
U.S.  Army,  Washington,  D.C. 

Port  Dictionary  of  Technical  Terms,  The  American  Association  of  Port  Authorities 

Knight's  American  Mechanical  Dictionary,  pubUshed  1877  by  Hurd  &  Houghton  of 
New  York 

The  Sea  Coast,  W.  H.  Wheeler,  published  by  Longmans,  Green  &  Co.,  London,  1902 

The  Protection  of  Seashores  from  Erosion,  Alfred  Edw.  Carey,  published  by  Green- 
ing &  Co.,  Ltd.,  London,  1907 

Coast  Erosion  and  Foreshore  Protection,  John  S.  Owen  and  Gerald  O.  Case,  St. 
Brides  Bros.,  Ltd.,  London,  1908 

Coast  Erosion  and  Protection,  Ernest  R.  Matthews,  publisher — Charles  Griffen  Co., 
Ltd.,  London,  1918 

Conclusions 

Seawalls  of  various  design  and  groins  may  be  properly  used  in  protecting  shores 
and  beaches  after  careful  studies  of  all  conditions  have  been  concluded  to  enable  the 
selection  of  an  adequate  design  of  seawall  or  groin  or  a  combination  of  both. 

No  recommendations  are  made  with  reference  to  any  effective  type  of  structure  by 
reason  of  the  great  variance  in  conditions. 


It  is  recommended  that:  (1)  The  definition  in  this  report  be  included  in  the  Manual; 
(2)  the  balance  of  the  report  be  received  as  information  and  (3)  the  subject  be  dis- 
continued. 


Report  on  Assignment  7 

Reasonable  Life  of  Steel  Casings  Immersed  in  Sea  Water 

W.  D.  Faucette  (chairman,  subcommittee),  W.  G.  Nusz,  V.  B.  W.  Poulsen,  A.  N.  Reece, 
J.  L.  Starkie,  A.  B.  Stone,  S.  L.  Wonson. 

This  subject  was  assigned  to  Committee  25  five  years  ago,  and  after  your  subcom- 
mittee chairman  had  considered  the  question  of  approach  to  the  subject,  it  was  learned 
that  the  War  Department,  through  the  office  of  the  Chief  of  Engineers  (Major  General 
Julian  L.  Schley),  and  more  particularly  through  the  Beach  Erosion  Board  at  Wash- 
ington, was  investigating  at  some  length  a  report  on  steel  sheet  piling  in  various  parts 
of  the  country  and  was  carrying  this  work  on  in  considerable  detail  and  thoroughness. 


Waterways   and    Harbors  91 

In  view  of  the  time  and  care  that  was  being  devoted  to  this  investigation  by  the  War 
Department,  it  was  the  opinion  of  the  committee  that  its  study  could  be  pursued  to 
greater  advantage,  if  it  were  deferred  until  the  War  Department's  report  was  more 
nearly  complete. 

The  problem  of  "material  corrosion"  has  been  the  subject  of  an  investigation  under 
the  direction  of  the  district  engineer,  U.S.  Corps  of  Engineers  at  Boston,  Mass.,  whose 
latest  report,  designated  Fourth  Interim  Report,  appeared  under  date  of  April  1,  1939. 
The  purpose  of  this  investigation  was  to  determine  the  proper  metals  for  mechanical 
equipment  near,  or  immersed  in,  sea  water  on  the  Passamaquoddy  Tidal  Power  Project. 
This  interim  report  was  authorized  by  the  Chief  of  Engineers  of  the  U.S.  Army,  and 
the  last  report  was  submitted  by  Col.  A.  K.  B.  Lyman,  district  engineer,  Boston,  Mass. 

This  report  contains  the  following  figures  for  loss  of  weight  of  steel  subjected  to 
"simple  exposure"  during  the  years  1937  and  1938. 

Weight  Losses  in  Milligrams  Per  Square  Inch  Per  Year 
In  Air  Mean  Tide  Submerged 

Class    Classification  Max.    Min.    Avg.        Max.    Min.    Avg.        Max.    Min.    Avg. 

12        Steel    86.1      37.6      66.9         689.8     546.8     603.3        966.0    691.7    812.7 

Quotations  from  the  above  reports  hereinbefore  referred  to  must  be  considered  only 
as  information  currently  available,  not  as  conclusive  data.  Reports  prepared  in  the  future 
on  the  basis  of  more  complete  information  may  embody  data  that  deviate  markedly 
from  the  facts  now  available,  and  lead  to  different  conclusions. 

In  view  of  the  many  variables  that  influence  the  amount  of  corrosion,  such  as 
salinity,  abrasion,  metallic  content,  degree  of  immersion  (whether  partial  or  complete), 
humidity,  etc.,  the  committee  has  deemed  it  only  proper,  in  its  consideration  of  this 
subject,  to  defer  the  preparation  of  a  conclusive  report  on  this  assignment  until  some 
of  the  investigations  now  under  way  have  reached  the  stage  that  warrants  the  publica- 
tion of  specific  conclusions. 

The  attention  of  the  committee  was  directed  to  a  pamphlet  issued  by  the  Depart- 
ment of  Scientific  and  Industrial  Research  under  the  title  "Deterioration  of  Structures  in 
Sea  Water"  which  is  designated  as  the  Seventeenth  Interim  Report  of  the  Committee  of 
the  Institute  of  Civil  Engineers,  London,  England,  printed  in  1938,  which  committee  has 
been  investigating  the  deterioration  of  structures  in  sea  water  since  1916.  A  study  of  this 
report,  from  which  the  following  has  been  abstracted,  is  recommended  to  those  who  have 
occasion  to  undertake  an  investigation  of  this  general  subject. 

Summary  of  Conclusions  on  the  Five- Year  Tests  of  the  Committee's  Iron  and 
Steel  Specimens,  by  Dr.  Carl  Benedicks 

(from  page  32  of  the  report) 

(1)  Very  approximately,  the  depth  of  pitting,  in  total-immersion  as  well  as  in 
aerial  tests,  increased  roughly  in  proportion  to  the  air  temperature. 

(2)  The  half-tide  tests  showed  that  on  that  influence  of  temperature  on  the 
rate  of  pitting,  there  was  superimposed  an  opposite  effect,  which  was  weak  at  high, 
and  strong  at  low,  temperatures.  That  effect,  no  doubt,  was  the  easy  condensation 
of  water  at  low  temperatures,  which  was  naturally  the  primary  cause  of  corrosion. 
On  account  of  the  presence  of  salt,  the  occurrence  of  much  water,  at  low  tempera- 
tures, caused  a  very  strong  pitting  in  half-tide  tests. 

(3)  The  most  striking  fact  regarding  general  wastage  under  conditions  of  total 
immersion  was  that  it  did  not  increase  with  increasing  temperature,  as  might  be 


92 Waterways   and    Harbors 

expected.  The  cause  was  doubtless  that  a  protecting  coating  would  rapidly  be 
formed  on  iron  or  steel  surfaces  in  sea  water,  the  formation  of  the  coating  being 
comparable  with  what  was  known  regarding  certain  protecting  coatings  in  industry. 

(4)  The  effect  of  humidity  in  accelerating  corrosion  might  under  certain  cir- 
cumstances be  the  opposite  to  that  stated  in  (2)  above.  The  large  amount  of  rain 
and  fog  during  a  great  part  of  the  year  was  bound  to  have  the  effect  of  cleaning 
the  surface  of  the  specimens,  so  counteracting  corrosion;  that  was  especially  true 
in  the  tests  at  Halifax.  That  cleaning  action,  however,  scarcely  appeared  to  remove 
the  salt  existing  in  the  pittings  formed. 

(5)  The  fact  that  the  aerial  and  half -tide  wastage  at  Plymouth  was  more 
intense  than  that  at  Auckland  might  be  due  to  the  higher  relative  humidity  at 
Plymouth,  but  also  might  possibly  be  due  to  a  less  pure  atmosphere  there. 

(6)'  Carbon  steel  was  generally  more  corroded  than  iron,  which  was  to  be 
expected. 

(7)  From  the  foregoing  the  essential  character  of  the  results  observed  on  iron 
and  carbon  steel  seemed  to  be  fairly  well  explained  by  considering  the  known 
meteriological  factors,  on  the  theory  of  local  elements.  The  only  special  assumption 
made  was  the  formation  of  a  protecting  coating  in  sea  water  (Conclusion  3),  and 
eventually  of  a  less  pure  atmosphere  in  Plymouth  (Conclusion  5).  No  individual 
differences  in  the  action  of  the  sea  water,  nor  any  other  unknown  factors,  were 
necessary. 

(8)  An  explanation  was  put  forward  for  the  reason  why  paint  adhered  better 
to  iron  than  to  iron  oxide. 

(9)  It  was  pointed  out  that  "corrosion-fatigue"  was  merely  a  special  case  of  a 
general  effect,  implying  that  the  strength  of  a  material  was  effectively  lowered  by 
the  presence  of  a  wetting  liquid  medium  surrounding  the  material. 

In  our  own  country.  Dr.  William  F.  Clapp,  of  Duxbury,  Mass.,  in  his  laboratory 
investigation,  issued  "Laboratory  Bulletin  No.  2"  which  dealt  with  steel  corrosion  in 
salt  water.  His  observation,  based  on  various  research  data  which  he  had  collected  and 
selected  from  published  papers,  is  that  it  appeared  to  be  a  well  established  fact  that 
under  immersed  conditions,  variations  in  manufacture,  composition  and  structure  do  not 
materially  influence  the  amount  or  distribution  of  corrosion,  which  is  controlled  by 
factors  external  to  the  metal.  Following  this  line  of  thought,  he  emphasized  the  possi- 
biUty  of  metal  disease  due  to  extraneous  conditions,  and  thought  it  well  to  attempt  some 
research  along  the  angles  set  forth  in  his  bulletin.  The  committee  believes  that  a  reading 
of  Bulletin  No.  2  will  be  of  advantage  to  any  interested  student  of  this  subject. 

Through  the  continued  cooperation  of  Major  Albert  C.  Lieber,  Jr.,  of  the  War 
Department,  resident  member  and  recorder  of  the  Beach  Erosion  Board  at  Washington, 
your  committee  has  been  favored  with  the  opportunity  to  examine  certain  reports,  espe- 
cially the  partial  report  made  on  the  Investigation  of  Steel  Sheet  Piling,  covering  local- 
ities on  the  east  and  west  coasts  of  Florida.  As  aforementioned,  this  is  only  a  progress 
report,  but  the  committee  feels  that  it  is  of  value  to  the  profession,  even  though  the 
conclusions  must  be  considered  as  tentative.  One  interesting  observation  was  stated  as 
follows:  "It  appears  from  the  above  that  where  piles  are  subjected  to  frequent  wetting 
from  salt  water  and  spray,  there  is  little  difference  in  the  rate  of  deterioration  of  plain 
steel  and  copper  steel.  In  brackish  water,  the  copper  steel  appears  to  have  a  rate  of 
deterioration  slightly  less  than  that  of  plain  steel".  The  tabulation,  on  page  93,  which  was 
included  in  the  report  and  which  impresses  the  committee  as  being  of  importance,  lists 
the  average  annual  losses  of  metal  thickness,  in  inches,  in  bulkhead  piles  for  the  following 
conditions: 


Waterways   and    Harbors 93 

A.  Plain  steel,  uncoated,  exposed  on  one  side  to  salt  water  waves  and  spray 

B.  Plain  steel,  coated,  exposed  on  one  side  to  salt  water  waves  and  spray 

C.  Copper  steel,  uncoated,  exposed  on  one  side  in  harbor  waters 

D.  Copper  steel,  coated,  exposed  on  one  side  in  harbor  waters 

E.  Copper  steel,  uncoated,  exposed  to  atmospheric  corrosion  only 

Annual  Loss  of  Metal  Thickness  in  Inches 
Elevation 

Specimens                                                         +7  to  +14        +3  to  +6  0  to  +2 

A    0.013                   0.006  0.004 

B     0.003  0.002 

C     0.009  0.002 

D    0.005  0.003 

E     0.002                     


This  report  is  submitted  as  information  with  the  recommendation  that  the  subject 
be  continued. 


Report  of  Committee  13 — Water  Service,  Fire  Protection 

and  Sanitation 


B.  W.  DeGeer,  Chairman,      C.  K.  Holden  E.  M.  Grime,  Vice- 
R.  C.  Bardwell  R.  L.  Holmes  Chairman, 

W.  M.  Barr  a.  W.  Johnson  W.  G.  Powrie 

W.  E.  BicKEL  H.  F.  King  S.  E.  Printz 

C.  W.  Brown  Jr.  C.  R.  Knowles  W.  A.  Radspinner 
C.  B.  Bryant  H.  M.  Laudemann  O.  T.  Rees 

R.  W.  Chorley  J.  J.  Laudig  H.  E.  Silcox 

R.  E.  Coughlan  O.  E.  Mace  D.  A.  Steel 

W.  L.  CuRTiss  Ray  McBrian  R.  M.  Stlmmel 

J.  H.  Davidson  W.  A.  McGee  J.  E.  Tiedt 

G.  E.  Durham  H.  L.  McMullin  C.  P.  Van  Gundy 

P.  W.  Elmore  G.  F.  Metzdorf  H.  W.  Van  Hovenberg 

F.  A.  Feikert  R.  H.  Miller  R.  E.  Wachter 

R.  N.  Foster  E.  R.  Morris  K.  J.  Weir 

J.  S.  Hancock  M.  F.  Neuzil  J.  B.  Wesley 

J.  P.  Hanley  a.  B.  Pierce  Committee 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 

Progress  report — recommended  for  adoption  as  an  addition  to  material  now  in  the 
Manual page  96 

2.  Cause  of  and  remedy  for  pitting  and  corrosion  of  locomotive  boiler  tubes  and 
sheets,  with  special  reference  to  status  of  embrittlement  investigations. 

Progress  report — submitted  as  information page  96 

3.  Value  of  water  treatment. 
No  report. 

4.  Progress  being  made  by  federal  or  state  authorities  on  regulations  pertaining  to 
railway  sanitation,  collaborating  with  Joint  Committee  on  Railway  Sanitation,  AAR. 

No  report. 

5.  Cathodic  protection  for  prevention  of  corrosion  of  steel  tanks,  collaborating  with 
the  Electrical  Section,  Engineering  Division,  AAR. 

Final  report — submitted  as  information , page  97 

6.  Effect  of  lubricating  oil  in  boilers  and  methods  for  correction. 

Final  report — submitted  as  information  page  101  (a) 

7.  Removal  of  silica  from  boiler  feedwater. 

Final  report — submitted  as  information  page  101  (b) 

8.  The  principal  current  activities  of  the  Fire  Protection  and  Insurance  Section,  AAR. 
Progress  report — submitted  as  information page  106 

9.  Use  of  anti-foam  compounds  to  reduce  road  blowing. 
No  report. 

10.  Specifications  for  welded  steel  tanks  for  water  service,  collaborating  with  Com- 
mittee IS — Iron  and  Steel  Structures. 

No  report. 

The  Committee  on  Water  Service,  Fire  Protection 
AND  Sanitation, 

B.  W.  DeGeer,  Chairman. 

Bulletin  421,  December,   1940. 

95 
A 


96  Water    Service,    Fire    Protection    and    Sanitation 


Report  on  Assignment  1 
Revision  of  Manual 

E.  M.  Grime    (chairman,  subcommittee),  C.  B.  Bryant,  G.  E.  Durham,  J.  J.  Laudig, 
G.  F.  Metzdorf,  R.  H.  Miller,  O.  T.  Rees,  J.  A.  Russell,  H.  W.  Van  Hovenberg. 

Under  Specifications  for  Steel  Water  and  Oil  Tanks,  Manual  page  13-38,  the  first 
two  sentences  of  paragraph  11  now  read  as  follows: 

"For  plates  not  more  than  %  inch  thick,  5^-inch  rivets  shall  be  used.    For  thicker 

plates  %-inch  rivets  shall  be  used." 

To  make  this  specification  more  definite  and  complete,  the  committee  recommends 
that  the  following  be  added  as  a  third  sentence: 

"For  thin  plates  used  in  roof  construction,  ^,  i\  and  %.  inch  thick,  use  respectively 

%,  T^  and  J/2-inch  rivets." 


Report  on  Assignment  2 

Cause  of  and  Remedy  for  Pitting  and   Corrosion  of  Locomotive 

Boiler  Tubes  and  Sheets,  with  Special  Reference  to  Status 

of  Embrittlement  Investigation 

R.  E.  Coughlan  (chairman,  subcommittee),  R.  C.  Bardwell,  W.  M.  Barr,  W.  L.  Curtiss, 
J.  H.  Davidson,  G.  E.  Durham,  E.  M.  Grime,  H.  M.  Laudemann,  O.  E.  Mace,  Ray 
McBrian,  E.  R.  Morris,  R.  M.  Stimmel,  J.  B.  Wesley. 

During  the  past  year  your  committee  has  continued  its  cooperation  in  the  study  of 
embrittlement  being  conducted  by  the  Bureau  of  Mines,  at  College  Park,  Md.,  under  the 
sponsorship  of  the  AAR  with  the  National  Feed  Water  Studies  Committee.  The  com- 
mittee offers  the  following  abstract  of  a  report  on  this  subject  as  presented  by  Dr. 
W.  C.  Schroeder  of  the  Bureau  of  Mines,  to  the  Association  of  American  Railroads, 
Mechanical  Division,  in  June,  1940. 

This  report,  while  reviewing  material  on  which  your  committee  has  previously 
reported,  summarizes  the  present  status  of  this  investigation  in  a  definite  conclusion 
that  embrittlement,  or  as  it  is  now  being  called,  intercrystalline  corrosion,  is  not 
produced  in  a  boiler  by  direct  action  of  the  water,  but  by  a  concentrated  solution 
formed  from  it  in  capillary  spaces  in  rivet  seams  in  a  stressed  area. 

This  concentration,  and  subsequent  cracking,  results  from  minute  leakage  into 
a  stressed  area  of  the  seam.  The  resulting  cracking,  independent  of  the  water  con- 
ditions, depends  upon  localized  stress  brought  about  by  cold  work  or  other  practices 
beyond  the  control  of  water  service  engineers.  It  has  been  definitely  proved  that 
sodium  sulphate  offers  little,  if  any,  protection  from  this  type  of  cracking  in  loco- 
motive boilers. 

Embrittlement  detectors  have  been  developed  and  applied  to  locomotives,  which 
will  indicate  the  action  of  concentrated  boiler  feed  waters  on  stressed  specimens  of 
boiler  steel  while  the  locomotive  is  in  actual  service. 

Sulphite  liquors  and  some  tannin  compounds  have  been  found  to  protect  boiler 
steel  from  intercrystalline  corrosion  during  the  past  IS  years.  The  work  this  year 
has  indicated  that  the  protection  by  these  organic  materials  is  sometimes  minimized 


Water    Service,    Fire    Protection    and    Sanitation  97 

where  sodium  sulphate  and  sodium  chloride  are  present  in  any  appreciable  amount 
in  the  boiler  feed  waters.  In  the  use  of  these  sulphite  liquors  and  other  organic  mate- 
rial for  this  purpose,  it  is  necessary  that  chemical  control  of  the  concentration  of  the 
organic  inhibitors  as  well  as  the  dissolved  soUds  be  maintained  in  order  to  provide 
adequate  treatment  necessary  for  the  protection  of  the  boiler  steel. 

There  is  no  doubt,  from  the  results  of  the  studies  up  to  the  present  time,  that 
a  boiler  constructed  to  resist  embrittlement  will  need  no  other  protection  throughout 
the  life  of  such  a  boiler.  Welding  of  the  seams  would  be  one  means  of  accomplishing 
this  purpose,  but  such  construction  is  not  permitted  in  locomotive  boilers  at  this 
time.  Various  types  of  alloy  steel,  resistant  to  intercrystalline  corrosion,  offer  another 
possibility.  In  this  connection,  however,  it  has  been  definitely  estabUshed  that  some 
of  the  low  carbon  boiler  steels  containing  nickel  or  sihcon-manganese  are  not  as 
resistant  to  this  type  of  failure  as  is  standard  carbon  boiler  steel. 

While  there  is  no  question  but  that  a  great  deal  can  be  done  by  the  use  of 
organic  inhibitors  to  prevent  intercrystalline  corrosion  in  locomotive  boilers  already 
built,  the  importance  of  careful  design,  construction,  and  shop  practice  cannot  be 
over-emphasized.  Every  care  should  be  exercised  to  make  the  boiler  seams  tight  and 
to  prevent  the  excessive  cold  distortion  of  the  metal  which  produces  stressed  areas. 

The  evidence  obtained  to  date  from  actual  railroad  operation  indicates  that  a 
combination  of  good  construction  and  shop  practice  greatly  reduces  the  possibility 
of  costly  failures  from  intercrystalline  corrosion,  or  cracking. 


This  report  is  submitted  as  information. 


Report  on  Assignment  5 

Cathodic  Protection  for  Prevention  of  Corrosion  of  Steel  Tanks 

Collaborating  with  Electrical  Section,  Engineering  Division,  AAR 

H.  E.  Silcox  (chairman,  subcommittee),  C.  W.  Brown,  Jr.,  C.  B.  Bryant,  P.  W.  Elmore, 
F.  A.  Feikert,  J.  P.  Hanley,  A.  W.  Johnson,  H.  F.  King,  H.  M.  Laudemann,  A.  B. 
Pierce,  J.  A.  Russell,  J.  E.  Tiedt,  R.  E.  Wachter,  K.  J.  Weir. 

In  the  past  few  years  the  subject  of  corrosion  has  been  widely  discussed  and  various 
methods  have  been  tried  by  American  railroads  to  reduce  the  deterioration  of  steel  water 
tanks.  Many  methods  of  preventing  corrosion  have  been  found  efficient  in  their  applica- 
tion to  the  exterior  surfaces,  but  they  arc  not  proving  entirely  satisfactory  when  applied 
to  the  interior  surface  of  the  tank  shell  which  is  subjected  to  corrosive  action  of  water. 

Heavy  Losses  From  Underwater  Corrosion 

Approximately  6,000  steel  water  tanks  are  now  in  railroad  service  representing  a 
capital  investment  of  $30,000,000.  The  expected  life  of  these  faciUties  should  be  about  60 
years.  However,  due  to  underwater  corrosion  this  is  being  materially  reduced  by  the 
loss  of  steel.  Based  on  actual  tests,  the  coating  of  the  interior  surface  of  steel  tanks  with 
paints  of  various  types  affords  protection  for  a  period  ranging  from  1  to  4  years.  The 
labor  cost  involved  in  scraping  and  cleaning  the  interior  of  steel  tanks  averages  2.4  cents 
per  square  foot,  appHcation  of  paint  1.9  cents,  and  painting  material  for  two  coats  0.7 
cents,  or  a  total  of  5  cents.  At  this  rate,  the  painting  cost  for  the  interior  of  a  S0,000-gal. 
steel  tank  will  be  approximately  $95  and  larger  tanks  of  40-ft.  diameter  by  74-ft.  high, 


98 Water    Service,    Fire    Protection    and    Sanitation 

$790,  together  with  removal  of  tank  from  service  for  a  period  of  4  to  IS  days,  which  is 
the  more  important  item. 

The  different  water  qualities  in  the  various  sections  of  the  country  have  a  very 
marked  effect  on  the  rates  of  corrosion  of  the  steel.  In  mining  territories  the  acid  mine 
drainage  waters  create  a  higher  rate  of  corrosion,  while  the  rate  with  alkaline  waters  is 
lower. 

Underwater  corrosion,  as  appHed  to  the  interior  surface  in  steel  water  tanks,  is  based 
on  the  generally  accepted  electro -chemical  theory  that  the  metal  dissolves  and  goes  into 
solution  by  first  forming  ferrous  hydroxide  and,  with  further  oxidation  from  dissolved 
oxygen  in  the  water,  builds  up  a  wall  of  iron  rust  around  the  pitted  area.  In  this  reaction, 
the  steel  tank  shell  is  the  anode  or  positive  pole  and  rust  is  the  cathode  or  negative  pole 

[-  FERRIC  HYDROXIDE 
(RUST) 

'  -CATHODE 


•—FERROUS  HYDROXIDE 


FORMATION  OF  RUST 
CONES  AND  PITS 
FIG.  I 

as  illustrated  in  Fig.  1.  The  fundamental  reactions  and  factors  of  corrosion  are  similar  to 
those  of  a  primary  electric  cell,  as  in  its  function  one  metal  or  electrode  must  dissolve 
and  go  into  solution. 

Cathodic  Protection 

Cathodic  protection  is  a  recent  development  in  the  control  of  corrosion  on  the  interior 
of  steel  water  tanks.  This  process  is  based  on  the  principle  of  an  electric  cell  in  which  the 
current  flows  in  one  direction  from  the  positive  electrode  through  the  water  in  the  tank 
which  acts  as  an  electrolyte  to  the  cathode  or  negative  electrode.  In  its  operation,  the 
steel  tank  shell  becomes  the  cathode  which  is  protected  by  a  hydrogen  film  plated  on 
its  surface. 

In  the  application  of  cathodic  protection  to  steel  tanks,  direct  electric  current  is 
required  to  provide  a  continuous  current  flow.  As  direct  current  is  not  always  available 
the  supply  is  usually  secured  from  regular  lOS-120-volt,  60-cycle,  alternating-current 
electric  lighting  circuit  which  is  connected  to  a  transformer  to  reduce  voltage  to  the 
requirements  and  then  to  a  dry  disc  rectifier  unit  which  changes  the  power  to  direct 
current.  From  the  rectifier  the  positive  wire  or  lead  is  connected  to  one  or  more  electrodes 
of  carbon,  graphite,  stainless  steel  or  other  metals  which  are  suspended  inside  the  tank 
at  a  depth  where  they  will  be  submerged  in  water  at  all  times.  These  electrodes  form 
the  anodes  (positive  pole).  The  negative  wire  of  the  rectifier  is  connected  to  the  bottom 
of  the  tank  shell  which  becomes  the  cathode.  In  operation,  the  current  flows  from  the 
anode  to  the  cathode,  dissociating  hydrogen  ions  by  electrolysis  of  the  water.  Due  to 
the  tank  shell  being  in  an  electro-negative  state,  the  positive  hydrogen  ions  are  attracted, 
depositing  an  insulating  film  on  its  interior  below  the  water  line,  thus  excluding  oxygen 
which  is  a  requisite  of  corrosion. 


Water   Service,    Fire    Protection    and    Sanitation 


99 


"'  o 

X  X 


.<  fi 


S 


z 
o 


o 

UJ 


CJ 


H 

Z 

» 

(T 

o 

C 

_l 

3 

ll. 

U 

o 

^  S2 
o  ^ 
o 
o 

X 

o 


^ 


^ 

\ 


c 


100 Water    Service,    Fire    Protection    and    Sanitation 

Typical  installations  of  cathodic  protection  in  steel  elevated  and  standpipe  type 
water  tanks  are  outlined  in  Fig.  2. 

Equipment  Required 

The  cathodic  unit  consisting  of  transformer,  rectifier,  switches,  voltmeter,  and  fuses 
is  assembled  in  a  steel  cabinet  with  a  hinged  door  for  protection.  The  cabinet  for  in- 
stallation on  tanks  where  shelter  is  not  available  is  of  a  moistureproof  type.  In  event  a 
location  inside  a  building  is  possible,  an  ordinary  steel  cabinet  is  used. 

The  number  and  size  of  the  electrodes  depend  on  the  square  feet  of  area  under  water 
to  be  protected  and  pH  of  the  water  in  storage.  Installations  now  in  operation  are  pro- 
vided with  one  or  more  electrodes. 

In  the  alternating-current  rectification,  three  types  of  dry  plate  rectifiers  are  avail- 
able for  changing  a.c.  to  d.c,  namely,  magnesium-copper  sulphide,  selenium  or  copper 
oxide.  The  safe  maximum  operating  temperature  of  these  units  ranges  from  55  deg.  C. 
(131  deg.  F.)  to  85  deg.  C.  (185  deg.  F.).  Due  to  the  limited  period  of  service  of  these 
units,  it  still  remains  to  be  determined  which  type  has  the  longer  life  in  continuous 
hours  of  service. 

The  most  commonly  used  electrodes  (anodes)'  are  graphite  and  stainless  steel. 
Graphite  anodes  now  in  service  range  from  2  in.  to  3  in.  in  diameter  by  80  in.  in  length, 
while  the  stainless  steel  runs  from  %  in.  to  1  in.  in  diameter  of  varying  lengths.  As 
eventually  both  types  are  consumed  by  electrolysis,  the  ratio  of  actual  consumption  and 
life  in  cathodic  tank  protection  remains  to  be  determined  by  their  actual  performance. 

In  operation,  the  d.c.  voltage  at  the  positive  electrode  ranges  from  8  to  27  volts  and 
0.5  to  6  amperes,  depending  on  the  condition  of  the  tank  and  resistance  of  water  to 
passage  of  current.  Sufficient  voltage  should  be  applied  to  assure  complete  polarization  of 
the  steel  surface  to  be  protected,  as  the  operation  is  based  on  Faraday's  law  of  elec- 
trolysis: 

"The  mass  of  an  electrolyte  decomposed  by  an  electric  current  is  directly  pro- 
portional to  the  quantity  of  electricity  passing  through  it." 

In  observation  of  tank  interiors  that  have  had  this  type  of  protection,  it  is  noted 
that  the  old  scale  and  rust  is  gradually  sloughing  off,  the  metal  becoming  coated  with 
a  gray  deposit.  This  indicates  that  the  equipment  is  functioning;  however,  the  protec- 
tion is  due  to  the  microscopic  hydrogen  film  instead  of  the  gray  deposit. 

In  order  to  check  the  operation  of  the  unit  without  draining  the  tank,  test  specimens 
are  often  hung  in  the  tank;  one  connected  to  the  tank  shell  by  means  of  wire  which 
affords  it  the  same  protection  as  the  tank,  and  the  other  by  a  cord  or  rope.  The  wire- 
connected  specimen  in  time  becomes  covered  with  the  characteristic  gray  protective  coat- 
ing, indicating  that  action  is  taking  place.  The  second  specimen  in  a  short  time  becomes 
coated  with  rust,  and  pitting  develops.  This  method  is  being  used  by  the  manufacturers 
to  demonstrate  the  results  obtained. 

Extent  of  Use 

At  the  present  time  about  25  installations  of  this  type  are  in  service  on  American 
railroads,  the  oldest  unit  having  been  installed  in  March  1939. 

The  cost  of  the  units  installed  depends  on  the  area  to  be  protected.  A  unit,  with  one 
or  two  electrodes,  for  a  50,000-gal.  elevated  steel  tank  with  an  inside  area  of  approxi- 
mately 1,800  sq.  ft.  will  cost  approximately  $250  plus  the  expense  of  running  power  to 
the  tank.  Units  for  larger  installations,  such  as  a  standpipe-type  treating  tank  40  ft.  in 
diameter  by  S3  ft.  high,  with  a  downtake  tube  and  13,600  sq.  ft.  to  be  protected,  re- 


Water   Service,    Fire   Protection    and    Sanitation 101 

quiring  S  electrodes,  cost  approximately  $475.  The  power  cost  for  operating  the  cathodic 
protection  unit  ranges  from  SO  cents  per  month  up,  depending  on  capacity  of  installation. 
With  cathodic  installations,  it  is  still  necessary  to  paint  the  underside  of  the  roof 
and  the  tank  shell  above  the  water  line,  as  protection  does  not  extend  to  the  surface  area 
of  tank  above  the  water  level.  This  type  of  installation  has  an  advantage,  in  that  it  is  not 
necessary  to  remove  the  steel  water  tank  from  service  for  application  of  the  protective 
coating,  as  is  required  in  the  cleaning  and  painting  operation. 

In  the  event  that  installations  are  contemplated  in  old  steel  tanks  which  are  badly 
corroded  and  pitted,  the  condition  of  the  plates  and  rivets  should  first  be  investigated, 
as  the  cathodic  protection  through  removal  of  the  scale  may  develop  leaks  together  with 
loss  of  rivets. 

When  contemplating  installations  in  cold  regions,  consideration  should  also  be  given 
to  the  possibility  that  ice  forming  in  the  top  of  tanks  might  strip  the  cables  and  electrodes 
from  their  supports. 

Periodic  inspections  should  be  carried  out  to  determine  whether  the  equipment  is 
functioning,  and  for  recording  voltage  and  ampere  readings;  also  testing  switches  to 
detect  defective  or  blown  fuses.  The  interior  of  the  tank  shell  should  also  be  inspected 
to  observe  the  extent  of  the  deposit  of  protective  film  in  order  to  maintain  the  correct 
voltage  adjustment  to  meet  the  requirements  of  the  respective  installations. 

Conclusions 

Cathodic  protection  of  steel  water  tanks  against  the  corrosive  action  of  water  is 
still  in  the  experimental  stages;  however,  the  indications  are  that  some  benefits  are 
being  obtained. 

Because  of  the  limited  period  of  operation  in  railroad  water  service,  more  time  will 
be  required  to  demonstrate  whether  cathodic  protection  is  the  satisfactory  method  to 
prevent  corrosion  in  steel  water  tanks. 


This  report  is  presented  as  information. 


101(a)       Water    Service,    Fire    Protection   and    Sanitation 

Report  on  Assignment  6 

Effect  of  Lubricating  Oil  in  Boilers  and  Methods  for  Correction 

G.  E.  Durham  (chairman,  subcommittee),  W.  M.  Barr,  C.  W.  Brown,  Jr.,  R.  W.  Chorley, 
E.  M.  Grime,  J.  S.  Hancock,  J.  P.  Hanley,  R.  L.  Holmes,  C.  R.  Knowles,  J.  J. 
Laudig,  W.  A.  McGee,  R.  H.  Miller,  E.  R.  Morris,  S.  E.  Printz,  R.  M.  Stimmel, 
R.  E.  Wachter,  J.  B.  Wesley. 

The  steam  cylinder  or  valve  lubricating  oils,  with  which  this  report  is  primarily 
concerned,  usually  consist  of  heavy  mineral  oils  containing  a  small  amount  (about  four 
percent)  of  "compounding"  such  as  acidless  tallow  oil,  degras,  etc.  Steam  exhausted  from 
an  engine  may  carry  with  it  under  some  conditions  a  quantity  of  these  lubricants;  and 
when  such  steam  is  condensed  the  resulting  water  will  contain  oil.  Consequently,  any 
condensate  returned  to  a  boiler  from  a  condensing  system,  or  from  a  feedwater  heater 
or  exhaust  steam  injector,  is  liable  to  introduce  oil  into  the  boiler  water. 

Circumstances  other  than  the  return  of  condensate  may  cause  the  presence  of  oil 
in  boiler  water.  For  example,  improper  maintenance  of  feedwater  pumps  may  permit  the 
oil  used  for  lubricating  the  pumps  to  leak  by  the  packing  and  into  the  feedwater.  Again, 
the  feedwater  supply  may  be  originally  contaminated  by  oily  industrial  wastes. 

If  oil,  which  may  be  derived  from  sources  such  as  those  suggested,  is  permitted  to 
enter  a  boiler,  the  effects  may  be  detrimental  or  negligible;  the  nature  of  the  effects 
actually  realized  depends  to  a  large  extent  upon  the  alkalinity,  dissolved  solids  content, 
and  degree  of  floe  in  the  boiler  water. 

In  a  boiler  water  of  low  alkalinity  the  oil  present  may  be  deposited  on  heating 
surfaces  and  thus,  because  of  its  low  heat  conductivity,  very  materially  reduce  the  rate 
of  heat  transfer  to  the  water.  Overheating  and  cracking  of  firebox  sheets,  leaking  of 
staybolts  and  burning  out  of  arch  tubes  and  flues  may  easily  be  caused  by  severe  cases 
of  oil  deposit.  An  oil  coating  on  the  water  side  of  a  heating  surface  may  become  hot 
enough  to  char,  decompose,  and  suddenly  break  away  from  the  hot  steel,  permitting 
water  to  come  in  contact  with  the  overheated  area.  The  resultant  sudden  contraction  of 
the  steel  may  be  sufficient  to  cause  serious  damage. 

Even  a  slight  oily  deposit  on  boiler  heating  surfaces  produces  an  insulating  effect 
which  reduces  boiler  efficiency.  A  discontinuous  oil  coating  may  cause  pitting  in  various 
parts  of  the  boiler  if  the  boiler  water  is  of  a  nature  to  support  electrolytic  corrosion. 
Oil  carried  over  with  water  in  foaming  boilers  may  cause  incrustation  of  throttle  valves 
and  clogging  of  superheater  units. 

In  boiler  waters  whose  alkalinities  are  maintained  at  a  minimum  of  20  percent  of 
the  dissolved  solids  content,  the  effect  of  the  oil  content  ordinarily  encountered  appears 
to  be  slight.  Several  of  the  roads  reporting  in  this  connection  state  that  they  have  ex- 
perienced no  trouble  caused  by  oil  in  boilers,  and  attribute  the  absence  of  trouble  to  the 
maintenance  in  the  boiler  waters  of  suitable  alkalinity  and  good  coagulation  of  sludge. 
Apparently  the  alkalinity  tends  to  emulsify  the  oil  and  the  coagulated  sludge  tends  to 
absorb  it,  thus  preventing  any  actual  oil  deposits  which  might  produce  the  detrimental 
■effects  discussed  above. 

When  a  boiler  develops  symptoms  which  indicate  that  lubricating  oil  is  present  in  the 
water,  it  may  be  desirable  to  analyze  both  the  feedwater  and  the  boiler  water  for  oil 
content.  This  may  be  done  as  follows:  Acidify  a  500  c.c.  sample  with  dilute  nitric  or 
hydrochloric  acid  in  a  separatory  funnel.  Extract  three  times  with  carbon  tetrachloride. 
Draw  off  the  extractions,  combine  them  in  a  flask,  and  dehydrate  with  fused  calcium 


Water    Service,    Fire    Protection    and    Sanitation       101(b) 

chloride.  Filter  into  a  weighed  flask  and  carefully  evaporate  off  the  carbon  tetrachloride 
on  a  steam  table  at  105  deg.  C.  Cool  in  a  dessicator  and  weigh.  Reheat  the  flask  on  the 
steam  table  to  constant  weight.  The  weight  of  the  residue  in  milligrams  times  two  equals 
parts  per  million  of  oil.  In  taking  the  original  sample,  care  and  judgment  must  be  exer- 
cised to  insure  that  the  oil  content  is  uniformly  mixed  in  the  water  at  the  time  of  sampling. 

Where  lubricating  oil  in  a  boiler  is  causing  harmful  effects,  several  methods  of  cor- 
rection are  available.  If  the  oil  is  introduced  with  condensate  from  the  engine  or  from 
the  stoker,  the  best  corrective  measure  is  that  of  adjusting  the  lubricator  feeds.  This 
adjustment  should  be  such  as  to  reduce  to  a  practicable  minimum  that  excess  of  oil 
which  is  carried  out  with  the  exhausts.  If  oil  becomes  mixed  with  the  water  in  the 
feedwater  pump,  careful  inspection  and  maintenance  of  the  pump  packing  and  proper 
feeding  of  oil  to  the  pumps  should  be  effective  remedies. 

Various  designs  of  oil  strainers  or  oil  traps  may  be  used  in  the  feedwater  supply 
line  between  the  point  of  condensate  introduction  and  the  boiler.  These  strainers  are 
reported  to  be  effective  if  they  are  properly  maintained.  They  are  sometimes  supplied  as 
standard  equipment  with  appliances  such   as   exhaust  steam   injectors. 

Oil  present  in  locomotive  tender  water,  whether  from  original  contamination  or  from 
exhaust  of  boiler  auxiliaries,  tends  to  accumulate  on  the  sides  and  tops  of  tenders  rather 
than  to  become  emulsified  with  the  water.  Periodical  cleaning  of  the  tanks,  with  special 
attention  to  the  removal  of  the  oil  scum,  should  prevent  oil  in  the  tender  water  from 
getting  into  the  boiler. 

As  has  been  previously  indicated,  a  boiler  water  of  suitable  characteristics  can 
largely  emulsify  or  sludge  away  any  oil  introduced  into  it.  Consequently,  treatment  of 
feedwater  with  suitable  alkalies  and  coagulants  may  be  considered  as  an  effective  means 
of  correcting  boiler  troubles  caused  by  oil.  The  experience  of  most  railroads  proves  that 
proper  maintenance  of  boiler  auxiliaries,  avoidance  of  excessive  lubricator  feeds,  and 
proper  chemical  treatment  of  feedwater  will  generally  prevent  any  harmful  effects  of 
lubricating  oil  in  boilers. 


This  report  is  submitted  as  information. 


Report  on  Assignment  7 
Removal  of  Silica  From  Boiler  Feed  Water 

Ray  McBrian  (chairman,  subcommittee),  W.  M.  Barr,  C.  B.  Bryant,  R.  E.  Coughlan, 
G.  E.  Durham,  R.  N.  Foster,  E.  M.  Grime,  R.  L.  Holmes,  H.  M.  Laudemann, 
J.  J.  Laudig,  O.  E.  Mace,  H.  L.  McMulhn,  W.  G.  Powrie,  O.  T.  Rees,  R.  M.  Stimmcl, 
J.  B.  Wesley. 

The  presence  of  siUca  in  boiler  feed  waters  is  particularly  undesirable  since  it  may 
react  with  the  calcium  present  to  form  a  hard  dense  scale  deposit  of  calcium  silicate. 
Sihca  scale  has  become  a  problem  of  increasing  importance  with  the  trend  in  the  rail- 
road industry  towards  higher  boiler  pressures  and  to  the  use  of  Diesel  equipment  having 
heating  surfaces  that  are  especially  sensitive  to  scale  formation.  If  the  silica  content  of 
the  boiler  feed  water  is  kept  below  five  parts  per  million,  the  possibility  of  its  concentra- 
tion and  subsequent  precipitation  as  silicate  scale  is  greatly  reduced. 

Silica  scale,  of  all  the  mineral  boiler  scales,  possesses  the  lowest  thermal  conductivity 
coefficient,  as  is  shown  in  the  table  given  by  Stumper,  which  is  as  follows: 


102 Water   Service,    Fire    Protection    and    Sanitation 

Heat  Transfer 
Character  of  Scale  Coefficient,  K 

Siliceous   0.2  to  0.5 

Calcium  sulphate   0.5  to  0.7 

Calcium  carbonate,  amorphous    0.2  to  1.0 

Calcium  carbonate,  crystaUine    0.5  to  5.0 

The  constants  are  in  the  metric  system  of  units  and  are  consequently  expressed  as 
kilograms  per  meter  per  degree  centigrade  per  hour  of  time.  It  appears  that  the  ability 
of  the  siliceous  scale  to  conduct  heat  is  roughly  one-half  to  one-tenth  that  of  scales  in 
which  the  chief  constituents  are  calcium  carbonate  and  calcium  sulphate.  A  siliceous  scale 
film  of  only  a  fraction  of  the  thickness  of  a  usual  scale  deposit  might  exceed  other  types 
of  scale  formation  in  insulating  value,  and  the  danger  of  these  thin  deposits  on  heating 
surfaces  is  especially  great  in  the  modern  boiler  wherein  the  metal  temperature  is  nor- 
mally at  the  safe  maximum,  and  it  is  the  elevation  of  temperature  gradient  through 
the  boiler  metal  that  is  to  be  most  feared  from  silica  scale  deposits,  especially  with  the 
trend  in  locomotive  and  power  plant  practice  to  increasing  pressures. 

The  nature  and  formation  of  silica  scales  depend  upon  the  composition  of  the  boiler 
feed  water  and  the  conditions  of  operation.  The  composition  of  such  scales  may  range 
from  practically  pure  silica  through  simple  calcium  and  magnesium  silicates  to  much  more 
complex  compounds  such  as  analcite  (sodium  aluminum  silicate)  to  other  mixtures  in 
which  the  siliceous  components  seem  to  function  as  cementious  agents. 

Two  fundamental  methods  have  been  used  to  prevent  silica  scale: 

1.  The  internal  treatment  type,  through  a  suitable  physical  chemical  treatment 
of  the  boiler  feed  water. 

2.  The  external  treatment  type,  which  retaoves  the  silica  from  the  feed  water 
before  it  enters  the  boiler. 

Internal  Treatment 

This  type  of  physical-chemical  treatment  has  been  found  to  limit  certain  types  of 
silica  deposits  satisfactorily.  The  typical  chemicals  used  are  sodium  phosphates,  iron  com- 
pounds, sodium  aluminate,  and  organic  compounds  such  as  starches,  tannins,  lignins, 
tannic  acid,  and  the  glucosides.  The  action  of  these  compounds  alone  or  in  combination 
has  been  either  to  maintain  the  silica  in  solution  or  to  precipitate  it  as  a  non-adherent 
scale  which  must  then  be  removed  by  blowing  or  washing.  The  results  depend  upon  the 
boiler  pressure  and  the  condition  in  which  silica  and  other  constituents  are  present  in  the 
boiler  salines.  In  railroad  operation,  this  type  of  treatment  has  been  satisfactory  for 
particular  operating  conditions  and  territories. 

External  Treatment 

It  is  becoming  necessary  to  improve  the  methods  of  conditioning  silica  containing 
waters,  due  to  increasing  boiler  pressures  and  other  operating  factors.  It  is  these  factors 
which  have  placed  emphasis  on  removing  silica  from  the  water  before  it  enters  the 
boiler.  As  a  result,  many  efforts  have  been  made  to  work  out  effective  methods  of  silica 
removal. 

Several  of  these  methods  have  attempted  to  combine  siHca  removal  with  some 
degree  of  water  softening,  as  neither  the  standard  clarification  or  lime  and  soda  softening 
will  remove  more  than  a  small  percentage  of  the  silica  present  in  most  water  supplies. 
Where  recirculation  of  sludge  has  been  employed  some  further  silica  removal  has  been 
observed.  The  zeolite  method  of  softening  waters  by  either  a  natural  or  synthetic  silicate 
base  exchange  type  of  product  may  add  siHca  to  the  water  rather  than  diminish  the 


Water   Service,    Fire    Protection    and    Sanitation 103 

amount  of  silica  present,  while  the  carbonaceous  exchangers  apparently  do  not  alter  the 
sihca  content  of  a  water  passed  through  them. 

In  general,  methods  which  have  been  used  or  proposed  specifically  for  silica  removal 
have  been  for  the  most  part  unsuccessful  except  in  certain  isolated  cases.  The  one  general 
exception  to  this  statement  comprises  the  metallic  oxides  and  hydroxides,  particularly 
those  of  iron  and  aluminum. 

Iron 

This  method  of  sihca  removal  treats  the  water  with  ferric  sulphate;  optimum  silica 
removal  by  the  precipitated  hydrous  ferric  oxide  is  attained  at  a  pH  9,  and  the  treatment 
must  be  held  closely  to  this  pH.  The  ferric  sulphate  treatment,  while  effective  in  some 
cases,  has  several  Umitations,  which  seem  to  prevent  it  from  being  considered  as  the 
ultimate  solution  of  the  siUca  removal  problem.  In  the  first  place,  the  necessity  of  main- 
taining a  pH  of  9  usually  precludes  the  possibihty  of  securing  silica  removal  and  com- 
plete hme  and  soda  softening  in  one  precipitation.  While  it  is  possible  to  precipitate  the 
calcium  of  raw  water  rather  completely  as  calcium  carbonate  at  pH  9,  precipitation  of 
magnesium  as  magnesium  hydroxide  does  not  begin  until  a  pH  of  about  10.2  is  attained. 
Consequently  it  will  be  found  necessary  to  accomphsh  the  desired  softening  and  sihca 
removal  in  a  two-stage  process  which  increases  the  cost  and  complexity  of  the  treating 
equipment. 

Since  the  removal  of  sihca  by  the  precipitated  ferric  oxide  is  apparently  an  absorp- 
tion or  quasi-absorption  phenomenon,  it  follows  that  while  an  appreciable  part  of  an 
initially  high  silica  content  of  a  water  may  be  removed  with  moderate  dosages  of  ferric 
sulphate,  disproportionately  large  doses  will  be  required  to  reduce  the  remainder  to  a 
desired  minimum.  Another  consideration  from  the  standpoint  of  boiler  operation  is  the 
large  amount  of  dissolved  sohds  added  to  the  boiler  feed  water  by  large  dosages  of  ferric 
sulphate.  Every  grain  per  gallon  of  anhydrous  ferric  sulphate  employed  in  the  treatment 
adds  to  the  water  in  its  finally  softened  condition  1.06S  grains  per  gallon  of  sodium 
sulphate. 

Magnesium 

The  use  of  magnesium  compounds  added  where  apphcable,  seems  to  have  several 
advantages  over  the  use  of  ferrous  sulphate,  as  sihca  removal  is  combined  with  hme  and 
soda  softening  at  as  high  a  pH  as  may  be  desired.  The  use  of  magnesium  sulphate  is 
more  economical  than  ferric  sulphate,  not  so  much  because  of  the  cost  of  the  reagents 
themselves,  but  because  of  the  cost  of  the  alkah  necessary  to  combine  with  them. 

One  hundred  parts  per  million  of  anhydrous  ferric  sulphate  will  require  theoretically 
for  reaction  in  hme  and  soda  softening  62  p.p.m.  of  hydrated  hme  (90  percent  available 
calcium  hydrate)  and  81  p.p.m.  of  soda  ash  (98  percent  sodium  carbonate),  whereas 
100  p.p.m.  of  magnesium  sulphate  (Epsom  salts)  will  require  only  33  p.p.m.  of  hydrated 
Hme  and  44  p.p.m.  of  soda  ash.  On  the  basis  of  present  market  prices,  this  unit  difference 
in  chemical  requirements  amounts  to  about  0.567,  or  one-half  cent,  per  thousand  gallons. 
.Also,  the  use  of  100  p.p.m.  of  ferric  sulphate  under  these  conditions  will  add  to  the  water 
100  p.p.m.  of  sodium  sulphate,  as  against  58  p.p.m.  of  magnesium  sulphate. 

Magnesium  carbonate  (or  bicarbonate)  has  been  suggested  as  an  effective  source  for 
magnesium.  The  chief  advantage  of  either  of  these  compounds  is  that  there  is  no  increase 
in  the  amount  of  sodium  salts  as  a  result  of  the  treatment.  Another  advantage  is  that 
hme  only,  without  soda  ash,  is  required  for  precipitation. 

Dolomitic  lime  has  been  suggested  in  place  of  high  calcium  lime,  but  it  has  not  been 
found  as  successful  as  magnesium  hydroxide,  which  to  be  effective  in  silica  removal, 
must  be  formed  in  the  water  being  treated. 


L 


104  W 


TTTTlTTVTT^Fire    Projection    and    S  a  n  i  t  a  Uon_ 


Exterior  View  of  the  Silica 


Removal  Plant  of  the  Atlantic  Coast  Line  at  Savannah,  Ga. 


A  Corner  of  the  Silica  Removal  Plant  at  Savannah,  Ga. 


Water    Service,    Fire    Protection    and    Sanitation  105 

Aluminum 

Anhydrous  aluminum  oxide  is  an  effective  material  for  the  removal  of  sihca  from 
water  and  it  can  be  prepared  from  sodium  aluminate  or  other  aluminum  salts.  With  the 
use  of  sodium  aluminate  as  a  source  for  anhydrous  aluminum  oxide,  a  controlled  pH  of 
about  8.5  is  required.  This  control  of  the  pH  is  essential  as  is  also  the  build  up  and  the 
recirculation  of  the  precipitate  formed.  The  completeness  of  the  removal  is  dependent 
upon  the  amount  of  sodium  aluminate  used  in  the  auxiliary  treatment. 

A  complete  softener  has  been  installed  on  a  railroad  at  Savannah,  Ga.,  for  silica 
removal.  The  treating  tank  consists  of  a  100,000-gal.  wood  tank,  30  ft.  in  diameter  and 
20  ft.  high,  inside  of  which  is  built  another  complete  tank  15  ft.  in  diameter  and  of  equal 
height  to  the  larger  tank.  The  raw  water  is  derived  from  a  deep  well  and  is  pumped  at 
the  rate  of  350  gal.  per  min.,  discharging  through  a  pipe  entering  through  the  bottom 
of  the  two  tanks  and  extending  18  in.  above  the  floor  of  the  smaller  tank.  The  water  is 
discharged  through  a  2 3^2 -in.  orifice  in  a  horizontal  plane,  in  order  to  set  up  a  circular 
movement  of  the  water  in  the  inside  15  ft.  diameter  tank.  At  the  point  where  the  raw 
water  is  discharged  in  the  tank,  a  solution  of  lime  slurry  and  sodium  aluminate  is  added 
at  the  rate  of  0.9  lb.  of  Ume  and  1.2S  lb.  liquid  aluminate  per  1,000  gal.  of  raw  water. 
This  produces  a  precipitate  in  the  water  which  is  fine  and  light.  The  lime  and  aluminate 
continue  to  react,  moving  in  an  upward  direction,  and  at  a  height  of  12  ft.  an  alum 
solution  is  injected  for  coagulation.  The  alum  is  added  at  the  rate  of  0.8  to  0.9  lb.  per 
1,000  gal.  of  raw  water.  The  circular  and  upward  movement  of  the  raw  water  continues 
to  a  point  24  in.  below  the  top  of  the  tank,  where  it  passes  downward  through  a  12-in. 
diameter  steel  pipe,  located  in  the  center  of  tank,  and  discharges  into  the  bottom  of  the 
larger  tank  in  such  a  way  as  to  create  a  circular  movement  in  the  outer,  larger  tank. 
Coagulation  and  settling  continue  in  the  larger  tank;  clear  water  is  taken  off  from  the 
top  of  the  larger  tank  and  goes  to  a  storage  tank.  Tannin  is  added  to  the  water  when 
the  water  passes  through  the  equalizing  chamber. 

The  large  treating  tank  is  equipped  with  the  conventional  sludge  removal  system. 
No  sludge  accumulates  in  the  center,  or  smaller,  tank.  The  entire  plant  is  automatically 
controlled.  Laboratory  tests  have  shown  that  the  optimum  pH  for  the  water  reaching 
the  top  of  the  small,  or  inner,  tank  is  8.5.  It  has  been  difficult  to  control  or  hold  the 
pH  to  8.5  in  actual  operation. 

The  following  is  a  typical  analysis  of  the  raw  and  treated  water: 

Raw  Treated 

Grains  per  Grains  per 

Gallon  Gallon 

Silica   3.80  Silica    0.60 

Hardness 6.90  Hardness   3.72 

Alkalinity    7.08  AlkaUnity    5.14 

Chlorides    1.00  Chlorides    1.00 

The  cost  per  1,000  gal.  for  chemicals  has  been:  lime  ,$0.0059,  aluminate  .$0.0462, 
alum  $0.0109,  tannin  $0.0104,  total  $0.0734. 

The  results  have  been  very  gratifying  in  the  prevention  of  silica  scale  formation. 


This  report  is  submitted  as  information. 


106  Water    Service,    Fire    Protection    and    Sanitation 


Report  on  Assignment  8 

Principal  Current  Activities  of  the  Fire  Protection  and 
Insurance  Section,  AAR 

G.  F.  Metzdorf  (chairman,  subcommittee),  H.  F.  King,  W.  A.  Radspinner. 

Fire  protection  and  prevention  and  the  allied  item  of  insurance,  are  important 
subjects  for  every  railroad. 

The  organization  of  a  new  Fire  Protection  and  Insurance  Section  in  the  Operating- 
Transportation  Division  of  the  Association  of  American  Railroads  became  effective 
April  1,  1939.  The  creation  of  this  new  section  was  brought  about  by  absorbing  the 
Railway  Fire  Protection  Association,  which  had  functioned  since  1913  as  an  independent 
organization  of  railway  employees  engaged  in  fire  protection  and  prevention  activities, 
with  an  associate  membership  of  interested  industrial  and  insurance  representatives.  The 
amalgamation  was  proposed  by  the  Fire  Protection  Association,  and  became  effective 
following  approval  by  the  General  Committee  of  the  Operating-Transportation  Division. 

The  objectives  of  this  new  section  are  the  improvement  in  methods  of  fire  pro- 
tection and  prevention,  the  circularization  of  information  on  these  subjects,  the  estab- 
lishment of  safeguards  against  loss  of  property  and  life  by  fire,  and  the  standardization 
of  practices  through  the  interchange  of  ideas  and  experiences. 

The  list  of  standing  committees  in  the  Fire  Protection  and  Insurance  section  is  as 
follows: 

Committee  1 — Insurance 

Committee  2 — Buildings,  Bridges,  Piers  and  Other  Structures 

Committee  3 — Engine  Houses,  Shops  and  Appurtenant  Operations 

Committee  4 — Flammable  Liquids,  Compressed  and  Liquefied  Gases  and  Hazardous 

Articles 
Committee  S — Special  Hazards 
Committee  6 — Statistics  and  Records 
Committee  7 — Rolling  Equipment 
Committee  8 — Hand  Book 
Committee  9 — Electrical 

The  committee  work  thus  far  has  been  devoted  to  a  revision  of  the  Railway  Fire 
Protection  Association  Hand  Book  which  will  now  become  the  Hand  Book  of  the  Fire 
Protection  and  Insurance  Section  of  the  Association  of  American  Railroads.  Up  to  the 
present  time  the  sections  as  revised  have  not  been  acted  upon  for  publication,  but  it  is 
anticipated  that  the  Hand  Book  will  be  ready  for  printing  before  the  section's  next 
annual  meeting  in  October  1941. 

This  Hand  Book  is  a  valuable  collection  of  information  of  approved  and  recom- 
mended practices  and  as  such,  proves  very  useful  to  the  fire  prevention  inspectors  as  well 
as  to  the  managements,  and  the  engineering  and  other  various  departments  of  the 
railroads. 


This  report  is  submitted  as  information. 


Report  of  Committee  14 — Yards  and  Terminals 


C.  H.  MoTTiER,  Chairman, 

J.  R.  W.  Ambrose 

C.  E.  Armstrong 

J.  E.  Armstrong 

c.  j.  astrue 

Hadley  Baldwin 

H.  G.  Basquin 

A.  L.  Becker 

V.  J.  Bedell 

W.    O.    BOESSNECK 

W.  J.  Brennen 
N.  C.  L.  Brown 
H.  F.  BuRCH 

H.    G.    D ALTON 

F.  T.  Darrow 
R.  B.  Els  WORTH 


W.  H.  Giles 
E.  D.  Gordon 
R.  J.  Hammond 
G.  F.  Hand 
M.  J.  J.  Harrison 
E.  M.  Hastings 
W.  J.  Hedley 
H.  O.  Hem 
W.  H.  HoBBS 
J.  M.  Hood 
E.  T.  Johnston 
E.  K.  Lawrence 

H.  C.  LORENZ 

L.  L.  Lyford 
J.  M.  Metcalf 


W.  F.  CuMMiNGS,  Vice- 
chairman, 
C.  A.  Mitchell 
H.  C.  Propst 
C.  L.  Richard 
H.  L.  Ripley 

H.    M.    ROESER 
W.  B.  RUDD 

W.  C.  Sadler 

C.  U.  Smith 

D.  J.  Strauch 
J.  N.  Todd 

E.  E.  R.  Tratman 
E.  P.  Vroome 

R.  W.  Willis 

Committee 


To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 

Recommended  additions  to  and  revisions  of  the  Manual page  108 

2.  General  requirements  in  terminal  facilities  for  various  later  types  of  equipment. 
Final  report — submitted  as  information page  110 

3.  Terminal  facilities  required  for  servicing  electrical  and  air  conditioning  equipment 
in  passenger  cars,  collaborating  with  Committee  1,  Electrical  Section,  Engineering  Division. 

Progress  report — submitted  as  information page  112 

4.  Scales  used  in  railway  service. 

Progress  report — submitted  as  information page  114 

5.  Terminal  facilities  required  for  the  care  of  Diesel  locomotive  equipment. 

Final  report — submitted  as  information page  128 

6.  Classification   yards,    collaborating   with    Committee    16 — Economics    of    Railway 
Location  and  Operation. 

Progress  report — submitted  as  information page  133 

7.  Terminal  facilities  required  for  the  washing  of  passenger  cars  mechanically. 

Final  report — submitted  as  information page  134 

8.  Terminal  facihties  required  for  the  handling  of  highway  trucks  and  trailers  on 
and  off  railroad  cars. 

Final  report — submitted  as  information page  136 

9.  Bibliography  on  subjects  pertaining  to  yards  and  terminals  appearing  in  current 
periodicals. 

Progress  report — submitted  as  information page  140 

The  Committee  on  Yards  and  Terminals, 

C.  H.  MoTTiER,  Chairman. 


Bulletin  421,  December,  1940. 


107 


108  Yards   and   Terminals 


Report  on  Assigfnment  1 
Revision  of  Manual 

L.  L.  Lyford  (chairman,  subcommittee),  J.  E.  Armstrong,  Hadley  Baldwin,  W.  F.  Cum- 
mings,  F.  T.  Darrow,  W.  H.  Giles,  G.  F.  Hand,  M.  J.  J.  Harrison,  E.  M.  Hastings, 
W.  J.  Hedley,  H.  C.  Lorenz,  J.  M.  Metcalf,  C.  H.  Mottier,  H.  L.  Ripley,  E.  E.  R. 
Tratman. 

Your  committee  recommends  the  following  changes  and  additions  for  publication  in 
the  Manual: 

Glossary 

Page  42:  insert  the  following: 
Siding. — A  track  auxiliary  to  the  main  track  for  meeting  or  passing  trains.  14 

Page  SO:  delete  the  following  under  the  heading  Track: 
— Passing. — ^A  track  auxiliary  to  the  main  track  for  meeting  or  passing  trains,  limited 

to  the  distance  between  two  adjacent  telegraph  stations.  14 

Insert,  in  lieu  of  the  deleted  definition,  the  following: 
— Passing. — A  track  auxiliary  to  the  main  track  for  meeting  or  passing  trains.  Same  as 
a  Siding.  14 

Freight  Terminals 
322.  Hump  Yards — General 

Delete  paragraph  322  (e),  page  14-21,  reading  as  follows: 

(e)  //  the  classification  tracks  are  also  used  as  departure  tracks,  it  is  desirable  to 
provide  additional  classification  tracks  for  overflow  classification  space  during  the  inspec- 
tion and  preparation  time  of  a  departing  train.  Lead  tracks  of  sufficient  lengths  should 
be  provided  at  the  outgoing  end  so  that  any  doubling  may  be  done  without  fouling  the 
entering  end  of  the  classification  tracks  and  thus  interfering  with  hump  operations. 

Insert  in  its  place  the  following  paragraph: 

(e)  It  is  desirable  to  make  up  and  dispatch  trains  from  the  classification  tracks  if 
local  conditions  permit,  and  such  a  method  of  operation  usually  expedites  movements 
through  the  yard  and  reduces  the  expense.  This  requires  that  a  sufficient  number  of  clas- 
sification tracks  be  long  enough  for  each  to  accommodate  a  full  length  outgoing  train, 
or  that  lead  tracks  be  provided  at  the  outgoing  end  such  that  the  combined  length  of  a 
classification  track  and  a  lead  track  be  sufficient  for  a  full  length  train,  thus  avoiding 
unnecessary  doubling  over  or  interference  with  hump  operation.  This  may  involve  a 
temporary  reassignment  of  classifications  during  the  inspection  and  preparatory  time  of 
a  departing  train. 

Add  new  paragraph  (f)  as  follows: 

(f)  Departure  tracks  may  be  required  for  making  up  and  dispatching  trains,  depend- 
ing on  local  conditions.  See  paragraph  333  (a). 

Reletter  present  paragraphs  (f),  (g)  and  (h),  as  (g),  (h)  and  (i). 

332.  Classification  Tracks 

Delete  paragraph  332   (c),  page  14-23,  reading  as  follows: 

(c)  Where  cars  of  single  classifications  accumulate  rapidly  enough  to  permit  of  for- 
warding them  in  whole  trains,  the  classification  tracks  may  be  used  as  departure  tracks 
for  such  business,  with  their  lengths  determined  accordingly. 


Yards   and   Terminals 109 

Insert  in  its  place  the  following  paragraph: 

(c)  Where  cars  of  single  classifications  accumulate  rapidly  enough  to  permit  for- 
warding them  in  whole  trains  or  under  conditions  outlined  in  paragraph  322  (e)  it  is 
desirable  to  make  up  and  dispatch  trains  from  the  classification  tracks. 

333.  Departure  Tracks 

Insert  new  paragraph  as  follows: 

(a)  When  conditions  specified  in  paragraph  332  (c)  do  not  apply,  separate  departure 
tracks  if  required  should  be  provided.  Limited  length  and  number  of  classification  tracks, 
volume  and  character  of  traffic  to  be  handled  in  limited  periods  of  time,  or  operating 
requirements  which  make  it  impractical  to  use  classification  tracks  as  departure  tracks, 
may  also  compel  provision  of  separate  departure  tracks. 

Reletter  present  paragraphs  (a),  (b),  (c)  and  (d)  as  (b),  (c),  (d)  and  (e). 

Specifications  for  the  Manufacture  and  Installation  of  Four-Section, 
Knife-Edge  Railway  Track  Scales 

52-X  Weighbeams  and  Accessories 
1101.  Design 

Delete  paragraphs  1101  (d)'  and  (e),  page  14-55,  reading  as  follows: 

(d)  Notches. — On  main  bars  the  notches  shall  not  be  spaced  closer  than  6  to  the  inch. 
Each  notch  shall  be  so  made  that  when  the  pawl  rests  in  it  a  line  projected  from  the 
center  of  the  side  of  the  notch  nearer  the  zero  graduation  to  the  axis  about  which  the 
pawl  stem  rotates  will  be  perpendicular  to  that  side  of  the  notch. 

(e)  Pawl  or  Latch. — The  tip  of  the  point  of  the  pawl  or  latch  shall  be  of  the  same 
width  as  the  notches  of  the  beam,  and  shall  be  rounded  off  so  that  a  small  amount  of 
dust  or  dirt  in  the  bottom  of  the  notch  will  not  prevent  the  poise  from  assuming  the 
correct  position. 

Insert  in  their  place  the  following  paragraphs: 

(d)  Notches. — On  main  bars  the  notches  shall  not  be  spaced  closer  than  6  to  the  inch. 
Notches  shall  be  so  formed  and  positioned  that  accurate  positioning  of  a  poise  will  auto- 
matically result  at  any  graduation  at  which  the  poise  may  be  placed. 

(e)  Pawl  or  Latch. — For  a  poise  on  a  notched  weighbeam,  the  design  and  construc- 
tion of  the  pawl  or  latch  and  its  appurtenances  shall  be  such  that  accurate  positioning 
of  the  poise  will  automatically  result  at  any  graduation  at  which  the  poise  may  be  placed. 

Specifications  for  the  Manufacture  and  Installation  of  Two-Section, 
Knife-Edge  Railway  Track  Scales 

53-Xl  Weighbeams  and  Accessories 

1101.  Design 

Delete  paragraphs  1101   (d)  and  (c),  page  14-74,  reading  as  follows: 

(d)  Notches. — On  m.ain  bars  the  notches  shall  he  spaced  not  closer  than  6  to  the  inch. 

Each  notch  shall  be  so  made  that  when  the  pawl  rests  in  it  a  line  projected  from  the 

center  of  the  side  of  the  notch  nearer  the  zero  graduation  to  the  axis  about  which  the 

pawl  rotates  will  be  perpendicular  to  that  side  of  the  notch. 

(e)'  Pawl  or  Latch. — The  tip  of  the  pawl  or  latch  shall  be  of  the  same  width  as  the 

notches  of  the  weighbeam,  and  shall  be  rounded  off  so  that  a  small  amount  of  dust  or 

dirt  in  the  bottom  of  the  notch  will  not  prevent  the  poise  from  assuming  the  correct 

position. 


110 Yards   and   Terminals 

Insert  in  their  place  the  following  paragraphs: 

(d)  Notches. — On  main  bars  the  notches  shall  not  be  spaced  closer  than  6  to  the  inch. 
Notches  shall  be  so  formed  and  positioned  that  accurate  positioning  of  a  poise  will  auto- 
matically result  at  any  graduation  at  which  the  poise  may  be  placed. 

(e)  Pawl  or  Latch.— For  a  poise  on  a  notched  weighbeam,  the  design  and  construc- 
tion of  the  pawl  or  latch  and  its  appurtenances  shall  be  such  that  accurate  positioning 
of  the  poise  will  automatically  result  at  any  graduation  at  which  the  poise  may  be  placed. 

Specifications  for  the  Manufacture  and  Installation  of  Motor  Truck,  Built-in, 
Self-Contained  and  Portable  Scales  for  Railway  Service 

S4-XIII  Weighbeams  and  Accessories 

1306.  Notches 

Delete  the  first  paragraph  of  section  1306,  page  14-97,  reading  as  follows: 
On  main  bars  the  notches  shall  not  be  spaced  closer  than  6  to  the  inch.  Each  notch 
shall  be  so  made  that  when  the  pawl  rests  in  it,  a  line  projected  from  the  center  of  the 
side  of  the  notch  nearer  the  zero  graduation  to   the  axis  about  which  the  pawl  stem 
rotates  will  be  perpendicular  to  that  side  of  the  notch. 

Insert  in  its  place  the  following  paragraph: 

On  main  bars  the  notches  shall  not  be  spaced  closer  than  6  to  the  inch.  Notches 
shall  be  so  formed  and  positioned  that  accurate  positioning  of  a  poise  will  automatically 
result  at  any  graduation  at  which  the  poise  may  be  placed. 

1307.  Pawl  or  Latch 

Delete  the  paragraph  of  section  1307  reading  as  follows: 

The  tip  of  the  pawl  or  latch  shall  be  of  the  same  width  as  the  notches  of  the  weigh- 
beam and  shall  be  rounded  so  that  a  small  amount  of  foreign  material  in  the  bottom  of 
the  notch  will  not  prevent  the  poise  from  assuming  its  correct  position  when  the  paivl  is 
dropped  in  the  notch. 

Insert  in  its  place  the  following  paragraph: 

For  a  poise  on  a  notched  weighbeam,  the  design  and  construction  of  the  pawl  or 
latch  and  its  appurtenances  shall  be  such  that  accurate  positioning  of  the  poise  will  auto- 
matically result  at  any  graduation  at  which  the  poise  may  be  placed. 


Report  on  Assignment  2 

General  Requirements  in  Terminal  Facilities  for  Various  Later 
Types  of  Equipment 

W.  H.  Giles  (chairman,  subcommittee),  C.  J.  Astrue,  W.  0.  Boessneck,  W.  F.  Cummings, 
H.  G.  Dalton,  W.  J.  Hedley,  W.  H.  Hobbs,  H.  C.  Lorenz,  J.  M.  Metcalf,  C.  A. 
Mitchell,  C.  H.  Mottier. 

For  the  purpose  of  this  report  later  types  of  equipment  are  considered  to  be  the 
so-called  streamline  passenger  cars  or  power  units  developed  by  the  railways  of  this 
country  within  the  last  decade.  Servicing  facilities  for  such  power  units  are  to  be  dis- 
cussed in  a  report  on  another  assignment  of  Committee  14,  limiting  the  assignment  of 
subcommittee  2  to  the  servicing  of  streamline  units  of  equipment  other  than  power  units. 


Yards   and    Terminals 111 

The  first  streamline  equipment  was  introduced  by  western  railways  during  1934. 
During  1940,  more  than  90  such  trains  were  in  operation  in  this  country  and  additional 
trains  were  being  constructed.  In  about  SO  train  units  the  motive  power  is  Diesel-electric, 
the  remainder  being  either  steam  or  electric.  The  Diesel-electric  trains  are  usually  built  to 
order  from  plans  incorporating  special  designs,  including  the  streamhne  features.  Some  of 
the  steam  trains  have  been  converted  from  standard  equipment  by  adding  skirting  and 
other  special  features.  In  general,  the  streamline  appearance  of  the  equipment  in  the 
trains  has  been  accomplished  by  the  addition  of  skirting  below  the  under  side  of  the 
car  body. 

Application  of  air  conditioning  to  railway  passenger  equipment  within  recent  years 
has  added  to  the  number  of  mechanical  apphances  attached  to  the  underframe  of  cars 
and,  therefore,  to  the  amount  of  inspection,  adjustments  and  repairs  to  be  performed 
below  the  floor.  The  addition  of  skirting  obscures  from  view  a  large  part  of  the  running 
gear  and  mechanical  apphances,  and  detailed  inspection  of  those  parts  of  a  streamhne  car 
is  difficult.  In  most  cases,  complete  inspection  can  be  accomphshed  best  by  means  of  an 
inspection  pit.  With  the  exception  of  a  pit  track  of  required  capacity  for  inspection,  the 
general  requirements  in  terminal  facilities  for  streamhne  cars  are  usually  included  in  the 
servicing  facihties  of  a  modern  coach  yard.  Consideration  should  be  given  to  the  location 
of  the  inspection  pit  track  at  a  coach  yard  to  permit  handling  the  train  into  the  facihties 
without  delays  and  to  reduce  the  switching  operations  to  a  minimum. 

The  car  unit  capacity  or  length  of  the  inspection  pit  and  the  necessity  for  appurte- 
nant servicing  facihties  at  the  pit  track,  such  as  are  usually  maintained  in  passenger  car 
servicing  yards,  depend  upon  the  requirements  of  the  inchvidual  railway.  The  number  of 
trains  requiring  terminal  inspection,  repairs  and  servicing;  the  length  of  trains;  and  the 
schedules  or  layover  time  are  factors  to  be  considered. 

Typical  Facilities 

Many  railways  operating  streamhne  trains  are  servicing  the  car  units  at  existing 
terminal  passenger  car  facihties.  In  some  cases  the  existing  inspection  pit  has  been  ex- 
tended as  requirements  demand,  or  an  inspection  pit  of  desired  capacity  has  been  pro- 
vided. 

One  western  railway  operating  a  large  number  of  streamline  trains  from  one  ter- 
minal has  supplemented  its  passenger  car  servicing  facihties  by  providing  an  inspection 
pit  of  sufficient  length  to  accommodate  the  train.  The  pit  is  used  exclusively  for  inspec- 
tion and  all  equipment  is  moved  to  the  coach  yard  for  servicing  and  repairs  after  inspec- 
tion has  been  completed.  The  coach  yard  is  modern  and  includes  repair  pits  as  well  as 
other  appurtenant  servicing  facihties. 

Another  western  railway  that  has  pioneered  in  the  development  of  streamhne  trains 
has  provided  a  separate  car  servicing  unit  for  handhng  such  equipment  at  one  of  its 
terminals.  This  includes  a  combination  inspection  and  repair  pit  of  train  length  capacity, 
with  appurtenant  coach  servicing  facihties.  Upon  arrival,  trains  are  placed  on  the  pit 
track  where  inspection,  repairs  and  servicing  are  completed. 

Conclusion 

It  is  the  observation  of  your  committee  that  one  or  more  pit  tracks  are  necessary 
for  the  complete  inspection  of  streamline  passenger  car  equipment.  The  number  and  length 
of  the  pits  will  depend  upon  individual  requirements,  considering  the  number  of  trains 
requiring  terminal  inspection,  the  length  of  trains,  and  the  schedules  or  layover  time  as 


112 Yards   and   Terminals 

factors.  The  servicing  facilities  required  for  streamline  cars  are  usually  included  in  a 
modern  coach  servicing  yard.  If  the  pit  track  is  to  be  used  for  inspection,  servicing  and 
repairs,  appurtenant  facilities  should  be  provided. 


This  report  is  submitted  as  information. 


Report  on  Assignment  3 

Terminal    Facilities    Required    for    Servicing    Electrical    and    Air 

Conditioning  Equipment  in  Passenger  Cars,  Collaborating  with 

Committee  1,  Electrical  Section,  Engineering  Division 

W.  J.  Hedley  (chairman,  subcommittee),  J.  R.  W.  Ambrose,  C.  J.  Astrue,  A.  L.  Becker, 
H.  G.  Dalton,  W.  H.  Giles,  W.  H.  Hobbs,  J.  M.  Metcalf,  C.  A.  Mitchell,  C.  H. 
Mottier,  H.  L.  Ripley. 

Terminal  facihties  required  for  servicing  electrical  and  air  conditioning  equipment 
in  passenger  cars  must  be  available  at  coach  yards  and  along  station  tracks  at  terminals 
or  other  stations  where  cars  are  to  be  serviced  or  held  for  considerable  periods  of  time. 

Electrical  Equipment 

Practically  all  passenger  cars  use  32-volt  direct  current  for  Hghting  and  other  inci- 
dental purposes.  A  few  cars  use  64-volt,  and  at  least  one  railroad  uses  110- volt  direct 
current.  Certain  types  of  air  conditioning  equipment  require  electric  current  for  standby 
use;  hence,  in  many  installations  the  facilities  required  are  similar  for  servicing  electrical 
equipment  and  for  air  conditioning  equipment. 

The  general  requirement  for  servicing  this  equipment  at  terminals  is  that  a  source 
of  direct  current  power  be  available  for  the  purpose  of  charging  batteries  or  for  floating 
batteries  at  times  when  cars  remain  in  use  in  the  terminal  for  an  extended  period.  This 
source  of  power  may  be  provided  from  a  direct  current  line  with  convenient  receptacles, 
or  it  may  be  furnished  from  portable  battery  charging  sets,  sometimes  called  "buggies," 
which  convert  220-volt  alternating  current  to  direct  current  of  varying  voltages  above 
32  volts.  Generally  in  coach  yards,  where  most  of  the  battery  charging  is  done,  it  is 
necessary  to  use  a  controlled-current  method,  which  provides  the  variable  voltages 
required  by  batteries  while  they  are  being  brought  up  from  a  run-down  condition  to  that 
of  having  a  satisfactory  charge.  Required  voltages  vary  from  32  to  75,  and  obviously  in 
a  terminal  of  any  size  various  voltages  are  needed  simultaneously.  If  charging  is  to  be 
done  while  cars  are  on  station  tracks,  current  of  variable  voltage  should  be  available 
alongside.  However,  if  operations  are  such  that  batteries  need  to  be  floated  only  during 
time  cars  are  standing  in  station,  a  constant  potential  method  may  be  employed,  with 
outlets  along  the  station  tracks  all  providing  current  of  the  same  voltage.  An  installation 
of  this  type  is  much  less  expensive  than  one  which  permits  separate  voltage  control  on  a 
large  number  of  circuits. 

The  first  cost  of  installation  is  generally  less  for  the  220-volt  lines  and  portable 
charging  sets  than  for  a  controlled-current  installation.  However,  portable  charging  sets 
have  relatively  higher  maintenance  cost,  and  they  occupy  platform  space  and  may  inter- 
fere considerably  with  the  other  uses  of  the  platform;  consequently,  in  many  installa- 
tions the  necessary  additional  expenditures  have  been  made  to  provide  low  voltage  direct 
current  lines. 


Yards   and   Terminals  113 

Because  battery  charging  requires  variable  voltage,  the  circuit  must  be  under  con- 
stant supervision  during  the  process  of  charging.  If  direct  current  lines  are  placed  along 
the  tracks  for  the  purpose  of  battery  charging,  they  not  only  require  the  use  of  relatively 
heavy  copper  in  order  to  avoid  heavy  loss  in  transmission,  but  it  is  also  necessary  that 
numerous  separate  circuits  be  provided  in  order  that  the  voltage  may  be  controlled. 
Voltage  control  of  this  system  must  be  handled  from  the  generator  house,  thus  requiring 
the  presence  there  of  an  attendant  who  must  be  kept  informed  of  the  progress  of  the 
charging  on  the  various  circuits.  If  portable  charging  sets  are  used,  each  set  is  controlled 
individually,  and  control  is  handled  by  someone  working  along  the  platform  who  is  in  a 
position  to  observe  the  progress  of  the  charging  operation. 

Location  of  Electrical  Outlets 

If  direct  current  is  to  be  used,  either  for  charging  or  floating  batteries  while  cars 
are  on  station  tracks,  receptacles  may  be  located  along  edge  of  platform  or  between 
tracks.  When  the  location  of  the  electrical  outlets  is  being  determined,  consideration 
should  be  given  to  construction  problems,  relative  accessibihty  of  receptacles,  possible 
passenger  injury  from  cables  carelessly  left  on  platform,  and  employee  hazard  from  use 
of  outlets  located  between  tracks.  If  outlets  are  located  between  tracks  it  may  be  neces- 
sary to  provide  wider  track  spacing.  If  direct  current  is  used  in  coach  yard,  similar  con- 
siderations are  involved.  If  batteries  are  to  be  charged  from  "buggies"  operating  from 
220-volt,  3-phase  line,  receptacles  for  "buggy"  connections  should  be  available  both  along 
station  tracks  and  in  coach  yards.  These  connections  would  be  to  lines  also  used  for  air 
conditioning  operation,  where  such  stand-by  service  is  required.  Receptacles  should  be  so 
designed  and  located  that  they  will  suffer  no  damage  from  water  or  snow. 

Air  Conditioning 

Air  conditioning  systems  now  in  use  are  of  five  types: 

1— Ice  activated 

2 — Steam  ejector 

3 — Mechanical  gas-engine  driven 

4 — Direct-mechanical 

S — Electro-mechanical 

The  following  tabulation  shows  the  number  of  cars  which  have  been  equipped  with 
each  of  the  various  systems  during  each  of  the  past  few  years: 

Mechanical 
Steam  Gas-Engine  Direct-  Electro- 
Ice              Ejector  Driven  Mechanical  Mechanical  Total 

Prior  to  1935 1,036                 229  0  1,200  171  2,636 

Year  1935    962                545  5  1,014  70S  3,231 

Year  1936    1,131                322  61  643  394  2,551 

Year  1937    482                515  184  861  507  2,549 

Year  1938    253                285  41  189  68  836 

Total    3,864  1,896  291  3,907  1,845  11,803 

This  tabulation,  taken  from  a  compilation  published  in  Railway  Electrical  Engineer, 
shows  the  number  of  cars  equipped  with  each  of  the  various  systems  during  each  cal- 
endar year.  Similar  figures  for  the  year  1939  have  not  been  compiled. 

Ice  activated  systems  are  popular  in  northern  areas,  and  steam  ejector  systems  are 
used  considerably  in  the  South  and  Southwest.  A  proper  determination  of  the  facilities 
required  at  any  particular  terminal  can  be  made  only  after  investigation  has  been  made 


114 Yards   and   Terminals 

to  determine  which  and  to   what  extent   the   various  systems   are  employed   on   cars 
entering  it. 

1.  Terminal  Facilities  Required  for  Ice  Activated  Cars 

For  cars  of  this  type,  both  train  shed  and  coach  yard  should  be  equipped  with  ice 
storage  faciUties  and  platform  trucks  for  handling  and  distributing  ice  to  the  bunkers. 
Low  platform  trucks  may  be  used  to  advantage  for  hauling  ice  along  platforms  to  the 
bunkers  under  car  floors.  Attention  should  be  given  to  reducing  as  far  as  possible  the 
accumulation  of  water  on  platforms  in  the  vicinity  of  ice  storage.  For  complete  servicing 
of  cars  equipped  with  the  ice  activated  system,  it  is  necessary  that  platforms  be  available 
on  both  sides  of  the  track  on  which  the  car  is  located. 

2.  Facilities  Required  for  Steam  Ejector  System 

Cars  equipped  with  this  system  require  a  steam  connection  for  stand-by  use.  Pressure 
in  the  steam  line  should  be  sufficient  to  maintain  a  minimum  of  SO  lb.  per  sq.  in.  at  the 
car  located  farthest  from  the  point  of  connection.  This  frequently  requires  a  Une  pressure 
of  125  lb.,  dependent  upon  the  number  of  cars  connected  in  line  and  the  amount  of  drop 
in  pressure  experienced  per  car.  Provision  must  be  made  to  furnish  dry  steam,  as  steam 
ejector  equipment  will  not  function  on  steam  carrying  excessive  water  or  condensate. 

3.  Facilities  Required  for  Mechanical  System — Gas-Engine  Driven 

No  special  terminal  faciUties  are  required  for  servicing  cars  using  this  system,  other 
than  that  a  sufficient  supply  of  the  proper  fuel  and  lubrication  be  available  for  periodic 
refueling  and  lubrication  of  the  engines. 

4.  Facilities  Required  for  Direct-Mechanical  and  Electro-Mechanical  Systems 

Most  cars  recently  equipped  with  these  systems  require  220-volt  alternating  current 
supply  for  stand-by  use. 

It  is  the  intention  of  the  committee  to  make  further  investigation  and  submit  definite 
recommendation  next  year  for  the  location  and  spacing  of  outlets  both  for  direct  and  for 
220-volt  alternating  current. 


Progress  report,  offered  as  information. 


Report  on  Assignment  4 
Scales  Used  in  Railway  Service 

M.  J.  J.  Harrison  (chairman,  subcommittee),  J.  E.  Armstrong,  Hadley  Baldwin,  H.  G. 
Basquin,  W.  J.  Brennen,  E.  D.  Gordon,  E.  M.  Hastings,  H.  O.  Hem,  E.  K.  Lawrence, 
C.  H.  Mottier,  H.  C.  Propst,  C.  L.  Richard,  H.  M.  Roeser,  C.  U.  Smith,  D.  J. 
Strauch,  J.  N.  Todd,  E.  P.  Vroome. 

On  December  1,  1921,  effective  January  1,  1922,  the  American  Railway  Association 
issued  its  "Grain  Circular  No.  1".  This  document  was  issued  pursuant  to  recommendation 
of  the  Interstate  Commerce  Commission,  as  set  forth  in  the  commission's  Supplementary 
Report,  Claims  for  Loss  and  Damage  of  Grain,  decided  January  13,  1920,  Docket  9009 
(56  ICC  347) .  It  contained  various  rules  applicable  to  the  handhng  of  grain  in  bulk,  and 
of  claims  arising  from  its  transportation.  It  also  contained  specifications  and  tolerances 
for  various  types  of  scales  used  in  weighing  grain. 

Section  II-B  of  Appendix  1  of  Grain  Circular  No.  1  applied  to  hopper  scales.  This 
section  was  further  considered  after  the  issuance  of  Grain  Circular  No.  1,  and  certain 


Yards   and    Terminals 115 

emendments  were  agreed  to  by  the  principal  parties  at  interest,  and  informally  approved 
by  the  Interstate  Commerce  Commission.  The  emended  material  was  promulgated  by  the 
National  Bureau  of  Standards  on  March  7,  1925,  as  its  Circular  No.  199.  There  was  no 
reissue  of  ARA  Grain  Circular  No.  1. 

By  recent  direction  of  the  Association  of  American  Railroads,  your  committee  has 
reviewed  critically  the  material  identified  as  Section  II-B,  Appendix  1,  ARA  Grain  Cir- 
cular No.  1.  The  requirements  of  that  section  have  been  considered  in  the  light  of 
(1)  corresponding  requirements  of  NBS  Circular  No.  199,  (2)  corresponding  require- 
ments of  currently  effective  AREA  specifications  applying  to  other  types  of  scales, 
(3)  current  manufacturing  practices,  and  (4)  practical  requirements.  As  a  result,  there  is 
now  submitted,  as  information  and  for  discussion,  a  tentatively  proposed  specification  for 
the  manufacture  and  installation  of  hand-operated,  grain-hopper  scales. 

For  obvious  reasons,  your  committee  has  solicited  the  collaboration  of  other  parties 
at  interest,  and  man}'  constructive  and  helpful  suggestions  have  been  received  from  such 
parties.  It  is  the  sincere  wish  of  your  committee  that  the  material  herewith  proposed  may 
be  further  studied  and  criticized,  to  the  end  that  the  ultimate  form  may  be  acceptable 
to  all  interested  parties. 

56.  PROPOSED  SPECIFICATIONS  FOR  THE  MANUFACTURE  AND 
INSTALLATION  OF  HAND-OPERATED  GRAIN-HOPPER  SCALES 

INTRODUCTION 
(In  course  of  preparation) 

56— I  CAPACITY 

101.  Scale  Capacity  Defined 

The  capacity  of  a  hand-operated,  grain-hopper  scale  is  the  weight  of  the  greatest 
load  which  may  be  equally  distributed  on  the  knife-edges  of  the  main  load  pivots  without 
producing  stresses  in  any  member  or  part  of  the  structure  in  excess  of  those  specified  in 
Section  56 — III  hereof. 

102.  Nominal  Capacity  Defined  and  Limited 

The  nominal  capacity  of  a  scale  is  the  largest  weight  indication  which  can  be  ob- 
tained by  the  use  of  all  the  reading  elements  in  combination,  including  the  amount  repre- 
sented by  any  removable  weights  furnished  with  the  scale,  fractional  bars  totaling  2  J/2 
percent  or  less  of  the  remaining  elements  being  neglected.  The  nominal  capacity  of  a 
hand-operated,  grain-hopper  scale  shall  not  exceed  the  scale  capacity  as  defined  in 
Paragraph  101  hereof. 

103.  Nominal  Capacities  Standardized 

For  purposes  of  design,  a  hand-operated,  grain-hopper  scale  shall  be  assumed  to  be 
one  of  the  following  nominal  capacities:  18,000  pounds,  30,000  pounds,  48,000  pounds, 
72,000  pounds,  120,000  pounds,  or  150,000  pounds. 

56—11  PLANS 
201.  Plans  to  Be  Furnished 

Assembly  plans  shall  be  furnished  by  the  scale  manufacturer  to  the  purchaser,  show- 
ing the  location  of  field  connections  and  all  information  necessary  for  the  purchaser  to 
design  and  construct  all  elements  of  the  assembly  not  furnished  by  the  scale  manufac- 
turer. On  request,  the  scale  manufacturer  shall  submit  to  the  purchaser  plans  showing 
materials,  stresses  and  detailed  dimensions  for  all  scale  parts. 


116 


Yards   and   Terminals 


56— III  WORKING  STRESSES  AND  FORMULAS 
301.  General  Working  Stresses 

The  maximal  permissible  unit  stresses  referred  to  in  Section  56 — I  hereof  are  given 
below. 

Table  1417 

Allowable  Unit  Stresses  in  Pounds  Per  Square  Inch  For  Iron  and  Steel 

Transverse  Bending                         Direct  Stress  Shear  and 

Material                    Tension     Compression             Tension     Compression  Torsion 
Cast  Iron  (gray) 
Thickness  of  section 
Inches 

0.25    5,000              8,500                      3,500             10,000  5,000 

0.3    4,780              8,130                      3,350              9,560  4,780 

0.35    4,600               7,820                       3,220               9,200  4,600 

0.4    4,450               7,560                      3,110              8,900  4,450 

0.45    4,320               7,340                       3,020               8,640  4,320 

0.5    4,200               7.140                      2,940              8,400  4,200 

0.6    4,020               6,830                       2,810               8,040  4,020 

0.7    3,870              6,580                      2,710               7,740  3,870 

0.8    3,740               6,360                       2,620               7,480  3,740 

0.9    3,630              6,170                      2,540               7,260  3,630 

1.0    3,540               6,020                       2,480               7,080  3,540 

1.1     3,450               5,860                       2,410               6,900  3,450 

1.2    3,380              5,750                      2,370              6,760  3,380 

1.3    3,310               5,620                       2,320               6,620  3,310 

1.4    3,250               5,520                       2,270               6,500  3.250 

1.5     3,190               5.420                       2,230               6,380  3,190 

1.6    3,140               5,340                       2,200               6,280  3,140 

1.8    3,050              5,180                      2,130              6,100  3,050 

2.0    2,970               5,050                       2,080               5,940  2,970 

2.5    2,810              4.780                      1,970              5,620  2.810 

3.0    2,690               4.570                       1,880               5,380  2,690 

3.5    2,580              4,390                      1,810              5,160  2,580 

4.0    2,500               4,250                       1,750               5,000  2,500 

Steel 
Structural  (SAE  1010 

to  1020)    10,000             10,000                    10,000             10,000  7,000 

Castings   (SAE  1020 

to  1030)    10,000             12,000                    10,000             12,000  8,000 

Pivots  and  Bearings 
SAE    1095,    hard- 
ened        24,000  24,000  24.000  24.000 

SAE  6195  or 
52100,   hardened  30,000  30,000  30,000  30,000 

In  designing  cast  iron  members  to  sustain  stress  of  any  character,  the  maximal 
allowable  unit  stress  shall  be  determined  by  the  greatest  thickness,  exclusive  of  fillets,  of 
the  portion  of  the  section  carrying  the  stress  being  considered.  In  the  main  portion  of  a 

beam,  the  thickness  of  the  web  or  flange  shall  be  used,  whichever  is  the  greater.  The 
thickness  of  the  flange  shall  be  considered  either  as  the  average  depth  of  the  outstanding 
portion,  or  the  breadth  of  flange,  outside  to  outside,  whichever  is  less. 

The  bearing  stress  on  steel  pins  shall  not  exceed  15,000  pounds  per  square  inch  on  any 
diametral  cross  section. 

In  proportioning  rivets,  nominal  diameters  shall  be  used. 

The  effective  bearing  area  of  a  pin,  bolt  or  rivet  is  the  diameter  of  the  member 

multiplied  by  the  thickness  of  the  member  upon  which  the  member  bears.  In  metal  % 


Yards    and    Terminals 117 

inch  thick  and  over,  half  the  depth  of  countersink  shall  be  omitted  in  calculating  bearing 
area.  In  metal  less  than  %  inch  thick,  countersunk  rivets  shall  not  be  assumed  to  carr>- 
bearing  stress. 

302.  High-Strength  Alloys 

For  materials  intended  or  represented  to  be  "high-strength"'  alloys,  unit  working 
stresses  other  than  those  given  in  Table  1  may  be  used,  pro\"ided  these  do  not  exceed 
one-third  the  imit  stresses  at  the  jield  point  established  according  to  the  test  routine 
followed  or  prescribed  by  the  .\merican  Society  for  Testing  Materials  for  parts  of  the 
same  analysis,  heat  treatment  and  size,  and  pro\ided  further  that  the  unit  working 
stresses  for  any  combination  of  gray  iron  and  carbon  steel  exclusive!}-  shall  not  exceed 
those  given  in  Table  1  for  steel  castings.  The  purchaser,  if  he  requests,  shall  be  furnished 
with  sufficient  data  or  test  ^)ecimens  to  enable  him  to  determine  the  physical  properties 
of  the  particular  "Tiigh-strength"  material  proposed  to  be  used. 

303.  Knife-Edge  Bearing  Stresses 

TTie  load  per  inch  of  knife-edge  shall  not  exceed  5,000  poimds  for  high  carbon  steel 
(S-\E  1095),  or  6,000  pounds  for  special  alloy  pivot  steel  (SAE  6195  or  52100),  when 
the  fulcrum  distance  of  the  lever  is  not  less  than  8  inches.  For  each  inch  or  fraction 
thereof  that  the  fulcnun  distance  is  decreased  from  8  inches,  the  permissible  load  per 
inch  of  knife-edge  for  that  lever  shall  be  decreased  from  the  value  above  given  by  11 
per  cent. 

304.  Concrete  Bearing  Stresses 

Bearing  stresses  on  concrete  shall  not  exceed  300  pounds  per  square  inch  under  scale 
lever  stands. 

305.  Projecting  Pivots,  Formula  for  Stresses 

Where  practicable,  pivots  shall  be  supported  their  full  length  by  integral  parts  of  the 
containing  lever. 

When  impracticable  so  to  support  the  pivots,  external  bending  moments  shall  be 
determined  as  follows: 

Let    JLf  =  the  required  bending  moment  in  inch-poimds 
L  =  the  length  in  inches  of  the  moment  arm 
T  =  the  distance  in  inches  between  the  friction  faces  of  the  loop 
IF=  the  total  load  in  poimds  on  both  ends  of  the  pivot 
D  =  the  length  in  inches  of  bearing  in  the  loop 
B  :=  the  width  in  inches  of  the  boss  or  sustaining  member  enveloping  the  pivot 

Theni:  =  D  2-^  (P  — B)-f-  ^  inch 

.\nd  jr=  ni  2 

306.  Levers,  Formula  for  Loading 

For  design  purposes,  each  comer  of  the  scale  shall  be  assumed  to  cany  30  percent  of 
the  nominal  capacity  which  is  contemplated  for  the  scale ;  the  weighbeam  and  shelf  lever, 
and  their  appurtenances,  shall  be  assumed  to  carr>-  150  percent  of  the  load  due  to  such 
assumed  nominal  capacity. 

5^R"  SC.\LE  LE\-ERS 
401.  Limitation  of  Type 

Truss  rods  shall  not  be  used  in  parts  of  the  lever  system  except  to  stiffen  levers 
lateralh-.  Truss  rods  designed  as  parts  of  a  lever  structure  to  support  vertically  applied 
loads  wiU  not  be  permitted. 


118 Yards   and   Terminals 

402.  Qualities  of  Castings 

Castings  used  for  levers  shall  not  be  warped.  They  shall  be  clean,  smooth,  uniform, 
and  free  from  blisters,  blowholes  and  shrinkage  holes  and  cracks.  Steel  castings  shall  be 
annealed. 

403.  Machined  Ways  for  Nose  Irons 

Levers  that  are  to  be  equipped  with  nose  irons  shall  have  those  portions  of  the 
lever  ends  receiving  them  machined  for  the  full  distance  over  which  the  nose  irons  may 
be  moved. 

404.  Leveling  Lugs 

In  scales  of  other  than  the  torsion  lever  type,  each  lever  shall  be  provided  with 
leveUng  lugs  for  longitudinal  alinement.  In  scales  of  the  torsion  lever  type,  leveling  lugs 
shall  be  provided  on  the  pipe  or  torsion  member  for  transverse  alinement,  and  on  the 
extension  arm  for  longitudinal  ahnement.  Each  pair  of  lugs  shall  be  spaced  11  inches 
apart.  The  leveling  surfaces  of  each  pair  of  lugs  shall  be  finished  to  a  common  plane, 
which  shall  be  parallel  to  the  plane  through  the  knife-edges  of  the  end  pivots. 

405.  Marking  of  Levers 

Figures  denoting  the  nominal  ratio  of  each  lever  shall  be  cast  or  otherwise  perma- 
nently marked  on  the  lever. 

406.  Permanency  of  Adjustment 

The  design,  workmanship  and  factory  adjustment  of  all  levers  shall  be  such  that  the 
proper  ratio  of  the  lever  arms  will  be  maintained. 

56— V  PIVOTS  AND  BEARINGS 

501.  Material 

The  material  used  for  pivots  and  bearings  shall  be  either: 

(a)  Special  alloy  pivot  steel  (SAE  6195  or  52100),  hardened  to  not  less  than  58  on 
the  Rockwell  C  scale,  or 

(b)'  High  carbon  steel  (SAE  1095),  hardened  to  not  less  than  60  on  the  Rockwell  C 
scale. 

502.  Design 

Pivots  shall  be  so  formed  that  the  included  angle  of  the  sides  joining  to  form  the 
knife-edge  will  not  exceed  90  degrees,  and  the  offset  of  the  knife-edge  from  the  center 
line  of  the  pivot  will  not  exceed  10  percent  of  the  width  of  the  pivot.  Pivots  intended 
to  be  held  in  place  in  their  respective  levers  exclusively  by  friction  shall  be  tapered  not 
more  than  %  inch  per  foot. 

503.  Mounting 

(a)  Fastening. — Pivots  shall  be  firmly  fastened  in  position  without  swaging  or 
calking. 

(b)  Machined-In  Pivots. — Pivots  shall  be  machine-finished  and  fitted  into  machined 
ways. 

(c)  Continuous  Contact  Required. — Pivots  shall  be  so  mounted  that  continuous 
contact  of  the  knife-edges  with  their  respective  bearings  for  the  full  length  of  the  parts 
designed  to  be  in  contact  will  be  obtained.  In  loop  bearings,  the  knife-edges  shall  project 
slightly  beyond  the  bearings  in  the  loops. 


Yards    and    Terminals  119 

504.  Position 

In  any  lever  the  pivots  shall  be  so  mounted  that: 

(a)  Each  knife-edge  will  be  maintained  in  a  horizontal  plane  under  any  load  within 
the  capacity  of  the  scale. 

(b)  A  plane  bisecting  the  angle  of  a  knife-edge  will  be  perpendicular  to  the  plane 
through  the  knife-edges  of  the  end  pivots. 

(c)  The  actual  distance  between  the  end  knife-edges  of  any  lever  will  not  differ 
from  the  nominal  distance  by  more  than  1/100  inch  per  foot  of  length  of  lever. 

(d)  The  knife-edges  in  any  lever  will  be  parallel. 

505.  Support  for  Projecting  Pivots 

The  reinforcing  on  the  levers  to  support  projecting  pivots  shall  be  tapered  off  to 
prevent  accumulation  of  dirt  next  to  the  pivots  and  to  provide  proper  clearances. 

506.  Design  of  Bearings 

Bearing  steels  and  the  parts  supporting  or  containing  them  shall  be  so  applied  to 
the  mechanism  that  permissible  movement  of  the  weighbridge  will  not  displace  the  line  of 
contact  between  any  bearing  and  the  opposing  pivot. 

507.  Interchangeability  of  Bearing  Steels 

All  bearing  steels  of  the  same  nominal  dimensions  or  parts  identification  shall  be 
interchangeable  or  mounted  in  interchangeable  bearing  blocks.  The  interchangeable  part 
shall  be  securely  mounted  in  the  part  containing  it. 

508.  Finish  of  Bearing  Steels 

The  bearing  surfaces  shall  be  brought  to  a  smooth,  true  and  accurate  finish  to  insure 
continuity  of  contact  with  opposing  pivots. 

56— VI  NOSE  IRONS 

601.  Design 

Nose  irons  shall  be  so  constructed  that: 

(a)  They  will  be  positioned  by  means  of  adjusting  screws  of  standard  size  and 
thread. 

(b)  They  will  be  retained  in  position  by  screws  or  bolts  of  standard  size  and  thread. 

(c)  The  surfaces  of  nose  irons  intended  to  be  in  slidable  contact  with  the  levers  will 
be  machined  true,  so  as  to  obtain  an  accurate  fit  in  or  on  the  levers. 

(d)  When  adjustments  are  made,  the  knife-edge  will  be  held  parallel  to  its  normal 
position. 

602.  Screws  and  Bolts 

Adjusting  and  retaining  screws  and  bolts  shall  be  made  of  a  corrosion-resistant 
material. 

603.  Retaining  Device 

Provision  for  retaining  each  nose  iron  in  position  shall  be  provided,  and  shall  be  so 
designed  and  constructed  that: 

(a)  It  will  be  independent  of  the  means  provided  for  adjustment  of  the  nose  iron. 

(b)  It  will  not  cause  indentations  in  the  lever. 

(c)  Loads  applied  to  the  scale  will  not  cause  tension  in  the  retaining  bolts  or  screws. 

(d)  The  nose  iron  will  remain  in  position  when  the  bolts  or  screws  are  loosened. 


120 Yards   and   Terminals 

604.  Marking  of  Position. 

The  position  of  each  nose  iron  as  determined  by  factory  adjustment  shall  be  accu- 
rately, clearly  and  permanently  indicated  by  well  defined  marks  on  the  lever  and  nose 
iron,  which  meet  in  a  common  line. 

56— VII  LEVER  FULCRUM  STANDS 

701.  Qualities  of  Castings 

Castings  for  lever  stands  shall  be  clean,  smooth,  uniform,  and  free  from  blisters, 
blowholes  and  shrinkage  holes  and  cracks. 

702.  Proportions 

Each  lever  stand  shall  be  so  designed,  constructed  and  installed  that,  under  any 
practical  condition  of  loading,  the  resultant  force  through  the  bearing  will  fall  within 
the  middle  third  of  the  length  and  width  of  the  base. 

703.  Finish  of  Bases 

The  base  of  any  lever  stand  shall  be  machined  true  within  a  tolerance  of  ^  inch 
to  a  plane  perpendicular  to  a  vertical  line  through  the  center  of  the  knife-edge  bearing 
carried  by  the  upright  portion  of  the  stand. 

704.  Finish  of  Tops 

The  top  of  any  lever  stand  receiving  a  bearing  steel,  cap  or  block  shall  be  finished 
smooth  and  shall  be  parallel  to  the  base  within  3*2  inch. 

705.  Anchor  Bolt  Holes 

Two  or  more  anchor  bolt  holes,  not  less  than  IJ^  inches  in  diameter,  shall  be  pro- 
vided in  proper  places  in  the  base  of  every  lever  fulcrum  stand,  unless  other  equally 
effective  means  for  anchorage  is  provided. 

706.  Height  Adjustment 

For  scales  of  120,000  pounds  and  150,000  pounds  capacity,  the  main  lever  stands 
shall  be  adjustable  in  height. 

56— VIII  LOOPS  AND  CONNECTIONS 

801.  Material 

The  requirements  for  material  and  hardness  of  bearing  surfaces  in  loop  connections 
shall  be  the  same  as  those  prescribed  in  Paragraph  501  hereof  for  pivots  and  bearings. 

802.  Design 

All  connections  and  their  elements  shall  be  so  constructed  and  installed  as  to  result 
in  the  maximal  practicable  flexibility.  Bearings  shall  be  self-alining.  In  loop  bearings,  the 
internal  radius  of  the  eye  of  the  loop  shall  in  no  case  be  less  than  the  diagonal  of  the 
cross  section  of  the  square  pivot,  or  the  short  axis  of  the  chestnut  pivot,  to  be  used  in 
the  loop. 

803.  Length  and  Adjustment 

Loops  in  like  connections,  except  when  adjustable,  shall  be  of  the  same  length.  The 
length  of  the  steelyard  rod  shall  be  adjustable.  The  means  for  adjustment  provided  in 
any  connection  shall  be  of  such  design  and  construction  that  accidental  change  in  the 
length  of  the  connection  cannot  occur  under  practical  service  conditions. 


Yards   and   Terminals 121 

56— IX  CHECKS 
901.  Arrangement 

When  check  rods  are  used,  they  shall  be  adjustable.  All  checks  shall  be  so  designed, 
constructed  and  installed  as  to  impose  no  restraint  upon  the  weighbridge  or  hopper  under 
any  practical  condition  of  loading,  and  insofar  as  practicable  shall,  for  any  scale,  be 
positioned  in  the  same  horizontal  plane. 

56— X  WEIGHBEAMS  AND  ACCESSORIES 

1001.  Limits  for  Nominal  Capacity 
See  Paragraphs  101  and  102  hereof. 

1002.  Capacity  to  Be  Marked 

The  nominal  capacity  shall  be  explicitly  and  conspicuously  marked  on  or  near  the 
weighbeam. 

1003.  Type  of  Weighbeam 

At  the  option  of  the  purchaser,  two  types  of  weighbeam  are  permitted  under  these 
specifications: 

(a)  A  weighbeam  comprising  a  single  bar,  with  its  poise,  and  a  counterpoise  hanger, 
on  which  all  or  a  major  portion  of  the  applied  load  is  intended  to  be  counterpoised  with 
counterpoise  weights  applied  on  such  hanger;  or 

(b)  A  weighbeam  of  the  full-capacity  type. 

When  specified,  registering  means  may  be  furnished  for  either  type  of  weighbeam 
named  above. 

1004.  Multiple 

For  all  scales  covered  by  these  specifications,  the  designed  multiples  at  the  load  and 
tip  knife-edges  of  the  weighbeam  shall  be: 

(a)  When  equipped  with  a  weighbeam  utilizing  counterpoise  weights,  100:1  to  the 
load  knife-edge  and  1000:1  at  the  tip  knife-edge  of  the  weighbeam. 

(b)  When  equipped  with  a  full-capacity  weighbeam,  200:1  to  the  load  knife-edge 
and  3500:1  at  the  tip  knife-edge  of  the  weighbeam. 

1005.  Graduations 

(a)  Readability. — A  weighbeam  shall  be  so  marked  and  graduated,  and  the  poise 
shall  be  so  constructed,  that  the  weight  corresponding  to  any  poise  position  can  be  easily 
and  correctly  read  without  moving  the  poise;  this  requirement  shall  be  met  regardless 
of  whether  the  weighbeam  is  or  is  not  a  registering  weighbeam. 

(b)  Value. — For  a  full-capacity  weighbeam,  the  notches  and  graduations  on  the 
main  bar  shall  be  made  at  1000-pound  intervals.  For  weighbeams  using  counterpoise 
weights,  the  capacity  of  the  weighbeam  bar  shall  be  1,000  pounds.  For  either  type  of 
weighbeam,  the  value  of  the  minimal  graduation  shall  be: 

Nominal  capacity  of  scale,  not  over  30,000  pounds 5  pounds 

"  "  "       "      more  than  30,000  pounds 10       " 

1006.  Poise  Stops 

Each  weighbeam  shall  be  provided  with  stops  to  prevent  any  poise  with  which  it 
may  be  equipped  from  traveling  and  remaining  back  of  the  zero  graduation. 


122  Yards   and    Terminals 

1007.  Notches 

On  all  notched  weighbeams,  the  notches  shall  face  either  horizontally  or  downward. 
Notches  shall  be  so  formed  and  positioned  that  accurate  positioning  of  a  poise  will  auto- 
matically result  at  any  graduation  at  which  the  poise  may  be  placed.  Notches  on  the 
main  bar  of  a  full-capacity  weighbeam  shall  be  spaced  not  closer  than  four  to  the  inch. 

1008.  Poises 

(a)  Readability. — See  Paragraph  1005- (a)   hereof. 

(b)  Projections  and  Recesses. — Poises  shall  be  so  designed  and  constructed  as  lo 
reduce  to  a  minimum  the  number  and  size  of  projections  and  recesses  that  will  retain 
foreign  material,  and  shall  be  as  nearly  dust-tight  as  practicable.  On  a  full-capacity 
weighbeam,  the  ends  of  the  main  poise  shall  be  completely  closed. 

(c)  Poise  Bearings. — Each  poise  shall  be  constructed  to  move  along  its  bar  without 
side  play.  On  a  full-capacity  weighbeam,  the  main  poise  shall  be  equipped  with  dust- 
tight  ball  bearings. 

(d)  Material. — The  exterior  shell  of  a  poise  shall  be  made  of  a  corrosion-resistant 
alloy,  steel,  iron,  brass,  or  any  other  metal  or  alloy  of  metals  not  softer  than  brass. 
Poises  shall  have  no  metal  softer  than  brass  making  contact  with  the  weighbeam. 

(e)  Movable  Parts. — All  movable  elements  forming  parts  of  a  poise  shall  be  so  con- 
structed as  not  to  be  detachable  without  manifest  mutilation  of  the  poise.  Set  screws,  if 
designed  to  secure  a  poise  at  any  point  on  a  weighbeam,  shall  not  be  readily  removable. 

(f)  Adjusting  Material. — Any  material  inserted  in  a  poise  for  adjusting  its  mass  shall 
be  securely  fixed  in  position  and  shall  not  be  accessible  without  at  least  partial  dis- 
assembly of  the  poise. 

(g)  Pawl  or  Latch. — For  a  poise  on  a  notched  weighbeam,  the  design  and  construc- 
tion of  the  pawl  or  latch  and  its  appurtenances  shall  be  such  that  accurate  positioning 
of  the  poise  will  automatically  result  at  any  graduation  at  which  the  poise  may  be  placed. 

(h)  Poises  on  Type-Registering  Weighbeam. — The  poise  or  poises  on  a  type- 
registering  weighbeam  shall  be  constructed  to  stop  positively  at  each  graduation,  and  lo 
prevent  movement  beyond  the  last  graduation.  A  substantial  type  of  hand  grip  shall  be 
provided  to  facilitate  the  registration  of  the  weight.  The  natural  operation  of  the  regis- 
tering mechanism  shall  not  cause  lateral  displacement  of  the  weighbeam. 

1009.  Registering  Weighbeam 

When  a  registering  weighbeam  is  furnished,  the  receptacle  or  receptacles  for  the 
weight  ticket  shall  be  so  positioned  and  formed  that  accurate  registration  of  the  indicated 
weight  will  result  when  an  appropriate  ticket  is  used. 

Type  figures,  if  used,  shall  be  of  a  material  sufficiently  hard  that,  under  the  designed 
conditions  of  use,  the  figures  will  not  become  battered  or  defaced.  The  figures  shall  be 
plain  and  of  such  design  as  to  insure  clear  impressions,  and  shall  be  so  attached  that  they 
cannot  become  loosened  or  detached  without  a  positive  indication  that  the  weighbeam 
is  out  of  order. 

If  pin  registration  is  to  be  used,  the  dimensions  and  disposition  of  the  printing  on 
the  ticket  for  which  the  device  is  designed  shall  be  definitely  specified  by  the  manufac- 
turer, and  the  pins  shall  be  accurately  located  to  result  in  correct  registration  when 
such  ticket  is  used. 

1010.  Balance  Ball 

A  balance  ball  shall  be  provided,  and  its  movement  shall  be  controlled  by  means  of 
a  hand-operated  screw  or  other  device  which  will  not  require  that  the  ball  be  rotated 
in  making  any  adjustments.  The  balance  ball  shall  be  provided  with  means  for  vertical 
adjustment. 


Yards   and   Terminals  123 

1011.  Weighbeam  Fulcrum  Stand 

(a)  Design. — The  weighbeam  shall  be  supported  on  a  stand  fitted  with  self-alining 
bearings.  Weighbeam  fulcrum  stands  shall  be  so  designed,  constructed  and  installed  that 
the  resultant  force  through  the  bearing  will  fall  within  the  middle  third  of  the  length 
and  width  of  the  base. 

(b)  Height. — The  height  of  the  stand,  measured  from  the  bottom  surface  of  the 
base  to  the  knife-edge  hne,  shall  not  exceed  20  inches. 

(c)  Finish. — ^The  bearing  surface  of  the  base  of  the  stand  shall  be  finished  to  a  plane 
perpendicular  to  the  axis  of  the  upright  portion  of  the  stand,  and  the  knife-edge  line  of 
the  bearing  shall  be  parallel  to  the  base. 

1012.  Trig  Loop 

(a)  Weighbeam  Travel. — ^The  permissible  travel  of  the  weighbeam  in  the  trig  loop 
shall  be  not  less  than: 

Length  of  Weighbeam —  Minimal 

Fulcrum  Knife-Edge  to  Trig  Loop  Travel 

Under  12  inches   0.4  inch 

Over  12  inches,  including  20  inches   O.S  inch 

Over  20  inches,  including  40  inches   0.7  inch 

Over  40  inches    0.9  inch 

(b)  Indicator. — The  weighbeam  shall  be  fitted  with  an  indicator  to  cooperate  with 
a  graduated  target  or  other  device  on  the  trig  loop,  or  vice  versa,  to  indicate  a  central 
position  in  the  trig  loop  when  the  weighbeam  is  horizontal. 

(c)  Material. — The  contact  parts  of  the  trig  loop  shall  be  made  of  a  non-magnetic 
material. 

1013.  Support  for  Weighbeam  Outfit 

The  weighbeam  fulcrum  stand  and  trig  loop  stand  shall  be  supported  on  a  metal 
shelf  mounted  on  metal  pillars,  or  equivalent  in  strength  and  durability.  The  shelf  shall 
be  sufficiently  rigid  that,  within  the  capacity  of  the  scale,  deflection  can  not  occur  to  such 
an  extent  as  will  affect  the  weighing  performance.  The  height  of  the  shelf  shall  be  such, 
in  conjunction  with  the  height  of  the  weighbeam  fulcrum  stand,  that  the  knife-edge  line 
of  the  weighbeam  will  be  not  more  than  5  feet,  6  inches  above  the  floor  surface  at  the 
weigher's  normal  position.  The  shelf  pillars  shall  be  supported  by  the  structure  which 
supports  the  scale. 

1014.  Counterpoise  Weights 

(a)  Design  and  Material. — Counterpoise  weights  shall  be  made  of  corrosion-resistant 
alloys,  steel,  iron,  brass,  or  any  other  metal  or  alloy  of  metals  not  softer  than  brass. 
They  shall  be  smooth,  without  sharp  edges  or  corners,  and  of  such  form  that  the  mini- 
mum of  surface  consistent  with  convenience  of  use  will  be  exposed  to  wear  and  corrosion. 
When  counterpoise  weights  are  to  be  used  with  a  registering  device,  the  effective  thick- 
ness of  each  weight  shall  conform  to  the  designed  thickness  within  such  limits  that,  at 
no  point  within  the  range  of  the  registering  device,  will  any  measurable  error  in  regis- 
tration be  caused  by  variation  in  weight  thickness. 

(b)  Corrosion  Protection. — Counterpoise  weights  made  of  corrodible  material,  such 
as  cast  iron  or  steel,  shall  be  protected  from  corrosion  by  the  application  of  a  durable 
chemical  coating. 

(c)  Marking.— Each  counterpoise  weight  shall  be  clearly  marked  with  its  nominal 
value,  i.e.,  1  pound,  2  pounds,  etc.,  and  also  with  the  value  of  the  load  which  it  is 
intended  to  counterpoise,  i.e.,  1,000  pounds,  2,000  pounds,  etc. 


124 Yards   and   Terminals 

(d)  Adjustment  Cavity. — Each  counterpoise  weight  shall  be  provided  exclusively  in 
its  side  with  one  or  more  adjustment  cavities  of  adequate  size  to  receive  sufficient  adjust- 
ing material  to  compensate  for  normal  wear  of  the  weight's  surface.  Each  such  cavity 
shaU  be  securely  closed  by  a  screw  plug  of  brass  or  similar  material,  covered  by  a  soft 
cap.  No  part  of  any  such  plug  or  cap  shall  project  above  the  surface  of  the  weight. 

(e)  Sealing. — ^After  each  counterpoise  weight  is  adjusted  to  its  proper  value,  all  plugs 
or  caps  closing  adjustment  cavities  shall  receive  the  impression  of  a  seal  or  stamp, 
appropriate  in  character  and  design  to  attest  the  authenticity  of  the  sealing. 

1015.  Weight  Lifting  Device 

For  scales  of  more  than  30,000  pounds  capacity,  designed  for  the  use  of  counter- 
poise weights,  there  shall  be  provided  a  device,  designed  and  constructed  for  manual 
operation,  which  may  be  used  to  elevate  and  hold  clear  of  the  weighbeam  and  the  coun- 
terpoise hanger  the  entire  appUed  counterpoise-weight  load.  The  construction  and  opera- 
tion of  the  device  shall  permit  normal  oscillation  of  the  weighbeam,  both  under  zero-load 
balance  and  under  any  condition  of  loading  in  which  a  load  in  the  hopper  is  counter- 
poised by  one  or  more  counterpoise  weights  applied  on  their  hanger.  The  cup  or  holder 
at  the  bottom  of  the  counterpoise  hanger  shall  be  securely  attached  to  the  stem,  and 
any  balancing  material  contained  in  such  cup  or  holder  shall  be  fixed  in  position. 

1016.  Weight  Racks 

For  each  weighbeam  equipped  with  counterpoise  weights,  a  weight  rack  shall  be 
provided.  The  surfaces  of  any  weight  rack  which  contact  or  support  the  counterpoise 
weights  shall  be  formed  of  a  relatively  soft  material,  such  as  rawhide,  fiber,  etc. 

1017.  Counterbalance  Weights 

The  design  and  construction  of  the  weighbeam  shall,  insofar  as  practicable,  be  such 
as  not  to  necessitate  the  use  of  counterbalance  weights.  When  counterbalance  weights 
are  to  be  used,  the  lower  end  of  the  counterbalance  hanger  stem  shall  be  threaded,  a  cup 
for  the  loose  balancing  material  shall  be  screwed  to  the  lower  end  of  the  stem,  and 
each  additional  weight  shall  be  provided  with  an  elongated  hole  in  the  center,  through 
which  the  hanger  stem  may  pass.  No  slotted  counterbalance  weights  are  to  be  used. 
When  no  counterbalance  weights  are  necessary  on  top  of  the  counterbalance  cup,  the 
cavity  shall  be  closed  by  a  cover  secured  in  a  positive  manner.  No  counterbalance  weights 
shall  be  used  in  any  place  in  the  scale  except  at  the  weighbeam. 

56— XI  ANTI-FRICTION  POINTS  AND  PLATES 

1101.  Material  and  Design 

Hardened  steel  anti-friction  contacts  shall  be  used  to  limit  longitudinal  displacement 
between  knife-edges  and  bearings.  They  shall  be  smooth  and  so  designed  and  applied  as 
to  provide  contacts  on  the  knife-edge  line. 

1102.  Clearances 

The  total  clearance  between  anti-friction  plates  and  points  shall  not  exceed  tt  inch 
on  the  weighbeam,  3^  inch  on  the  shelf  lever,  and  J4  inch  on  all  other  levers.  The 
minimal  clearances  shall  be  not  less  than  one-half  these  respective  amounts. 

56— XII  CLEARANCES 
1201.  General 

The  clearance  around  and  between  the  live  parts  of  the  lever  system  shall  be  at 
least  Yz  inch  except  at  points  where  other  clearances  are  specified.  (See  also  Paragraphs 
1102,  1503  and  1605  hereof.). 


Yards   and   Terminals  125 


56— XIII  INTERCHANGEABILITY 
1301.  Identification  Required 

Units  or  parts  of  units  intended  to  be  interchangeable  with  like  units  or  parts  of  the 
same  design  or  manufacture,  shall  be  identified  on  the  scale  plans  or  in  the  subject  matter 
of  the  proposal  in  such  a  manner  as  will  clearly  indicate  the  interchangeable  parts,  the 
manner  of  replacement,  and  the  adjustments  required,  if  any,  after  replacement. 

56— XIV  HOPPER  AND  GARNER 

1401.  General 

The  hopper  and  garner  shall  be  of  substantial  construction,  preferably  of  steel,  and 
shall  be  braced  as  necessary  to  prevent  distortion  under  load.  They  shall  be  grain-tight 
and  self-clearing  of  any  kind  of  grain  that  it  is  expected  will  be  handled  through  them. 

1402.  Capacity 

The  net  capacity  of  the  hopper  shall  be  at  least  23.05  cubic  feet  per  thousand  pounds 
of  nominal  capacity  of  the  scale. 

The  capacity  of  the  garner  shall  be  as  large  as  practicable,  and  preferably  shall 
exceed  the  volume  of  the  largest  carload  of  grain  which  it  is  expected  will  be  handled. 

1403.  Valleys 

The  bottoms  of  hoppers  and  garners  shall  be  so  formed,  or  the  valleys  so  filled  that 
sharp  V-valleys  will  be  avoided.  Valleys  of  wooden  hoppers  and  garners  shall  be  metal- 
sheathed.  The  pitch  of  valleys  shall  be  not  less  than  36  degrees  in  the  hopper  and  40 
degrees  in  the  garner. 

1404.  Gates 

Hopper  and  garner  gates  shall  be  grain-tight  and  shall  operate  freely.  Devices  for 
operating  the  gates  shall  be  located  on  the  weighbeam  side  of  the  hopper,  within  con- 
venient reach  of  the  weigher,  and  shall  be  provided  with  means  to  indicate  the  closed 
position  of  the  gates  and  to  prevent  accidental  opening  of  them.  All  gate  levers  shall  be 
moved  in  the  same  direction  to  perform  similar  functions.  No  operating  device  shall 
impose  any  lateral  or  vertical  restraint  on  a  hopper  except  at  the  time  of  operation. 
The  garner  gate  shall  be  so  located  as  to  discharge  grain  centrally  into  the  hopper. 

1405.  Canvas  Dust  Guards 

When  canvas  or  similar  material  is  used  to  enclose  the  opening  between  the  garner 
and  the  hopper,  it  shall  be  attached  only  to  the  garner,  and  provision  shall  be  made  for 
the  free  escape  of  air. 

56— XV  FOUNDATION 
1501.  General 

The  supporting  structure  for  a  hopper  scale  shall  extend  up  from  the  main  founda- 
tion of  the  elevator  and  shall,  insofar  as  practicable,  be  rigid,  integral,  and  free  from  all 
secondary  vibration  under  normal  conditions  of  elevator  operation.  The  immediate  sup- 
port for  the  scale  shall  be  the  scale  floor,  which  shall  preferably  be  of  reinforced  con- 
crete and  shall  be  constructed  with  a  minimum  of  openings  through  which  air  currents 
may  flow  to  disturb  the  balance  condition  of  the  scale.  A  hopper  scale  shall  not  be  in- 
stalled in  a  bin,  over  an  open  bin  or  open  pit,  or  on  bin  cribbing.  Suitable  provision  for 
anchoring  the  lever  fulcrum  stands  and  shelf  pillars  shall  be  provided.  The  design  shall 
permit  reasonably  convenient  removal  of  the  scale  parts  for  reconditioning. 


126 Yards   and    Terminals 

1502.  Weighbeam  Location 

Unless  impracticable,  the  weighbeam  shall  be  so  located  that  it  will  be  "right- 
handed",  and  that  no  levers  other  than  the  shelf  lever  are  necessary  between  it  and  the 
main  levers. 

1503.  Hopper  Clearances 

The  design  and  construction  of  the  building  shall  provide  a  clearance  of  not  less 
than  6  inches  around  each  hopper. 

56— XVI  INSTALLATION 

1601.  Stands 

The  lever  fulcrum  stands  shall  be  set  level  and  plumb,  without  shims  or  grouting, 
and  securely  anchored  in  proper  alinement  and  position. 

1602.  Alinement 

All  levers  shall  be  level  and  connections  plumb. 

1603.  Weighbridge  and  Hopper  Supports 

The  weighbridge  shall  be  constructed  of  steel,  and  shall  be  so  designed  and  con- 
structed that  the  tops  of  the  main  load  bearing  assembhes  may  be  bolted  to  it  in 
proper  ahnement.  Insofar  as  practicable,  the  hopper  supports  shall  transmit  the  load  to 
the  weighbridge  vertically  over  the  main  load  knife-edges  of  the  scale.  The  design  and 
assembly  of  the  hopper  and  weighbridge  on  the  lever  system  shall  produce,  as  nearly  as 
may  be,  equal  distribution  of  load  to  the  main  bearings  of  the  scale,  without  measurable 
tendency  to  alter  the  horizontal  alinement  as  a  result  of  normal  filling  or  emptying  of 
the  hopper  or  application  or  removal  of  test  weights. 

1604.  Test  Weight  Hangers 

Means  shall  be  provided  for  applying  test  load.  The  arrangement  shall  permit  test- 
load  apphcation  substantially  at  the  vertical  center  lines  through  the  main  load  bearings. 
Detachable  rods  are  recommended,  and  the  arrangement  should  permit  movement  to 
proper  position  of  wheeled  cradles  carrying  test  weights,  and  their  ready  hooking  to  and 
unhooking  from  the  lower  ends  of  the  hanger  rods. 

1605.  Safety  Piers  or  Hangers 

Suitable  piers,  posts  or  hangers  shall  be  provided  to  prevent  excessive  drop  of  the 
hopper  or  scale  levers  should  failure  of  the  scale  parts  occur.  A  clearance  of  not  to  exceed 
one  inch  shall  be  provided  between  the  pier,  post  or  hanger  and  the  part  which  it  is 
intended  to  protect. 

1606.  Vents  and  Signal  Lines 

Vent  or  other  pipes  connected  to  any  fixed  part  of  the  elevator  shall  not  be  attached 
to  scale  hoppers.  No  signal  wires  or  cords  or  other  similarly  objectionable  devices  shall 
pass  through  a  scale  hopper  or  be  attached  to  it  or  to  the  scale  parts. 

1607.  Accessibility 

The  scale  parts  shall  be  reasonably  accessible,  under  normal  elevator  operating  con- 
ditions, for  cleaning,  painting,  adjustment,  etc. 


Yards    and    Terminals 127 

1608.  Protection  from  Corrosion 

The  finish  and  treatment  of  all  surfaces  shall  be  such  as  to  insure  good  appearance 
and  satisfactory  resistance  to  corrosion.  The  surface  treatment  shall  be  durable  and 
appropriate  to  the  intended  uses. 

56— XVII  PERFORMANCE  REQUIREMENTS 

1701.  Scale  Tolerances 

The  tolerance  on  ratio,  in  excess  or  deficiency,  for  a  new  hand-operated  grain- 
hopper  scale,  after  installation  corrections,  shall  be  0.05  percent  of  the  test-weight  load 
symmetrically  appUed  to  the  main  load  bearings. 

(Tolerances  on  scales  equipped  with  full-capacity  weighbeams  are  under  consid- 
eration.) 

1702.  Testing  Equipment 

The  equipment  used  to  test  a  hand-operated  grain-hopper  scale  shall  comprise: 

(a)  A  complement  of  test  weights  adjusted  to  National  Bureau  of  Standards  toler- 
ances for  class  C  weights,  and 

(b)  A  complement  of  slotted  counterpoise  weights,  adjusted  to  National  Bureau  of 
Standards  tolerances  for  class  B  weights. 

1703.  Method  of  Test 

The  tolerance  stated  in  Paragraph  1701  hereof  comprehends  that  the  scale  is  tested 
to  its  capacity  by  applying  test  weights  exclusively.  When  circumstances  do  not  permit 
this,  the  minimal  test-weight  load  to  be  used  shall  be  8  percent  of  the  nominal  capacity 
of  the  scale,  increased  as  necessary  to  equal  a  simple  multiple  of  1,000  pounds.  The 
cradles  referred  to  in  Paragraph  1604  hereof  shall  be  considered  a  part  of  the  test-weight 
load  if  their  masses  are  individually  known  to  be  adjusted  to  within  class  C  tolerances. 

The  test-weight  hangers  shall  be  applied  to  the  weighbridge  or  to  the  bearing 
assemblies,  and  a  complement  of  "error  weights"  shall  be  placed  on  some  convenient 
shelf  or  other  surface  of  the  hopper  or  weighbridge.  With  the  hopper  empty,  the  scale 
shall  then  be  brought  to  accurate  zero-load  balance.  The  available  test-weight  load  shall 
be  applied,  distributed  equally  among  the  four  corners  of  the  scale,  and  a  corresponding 
amount  of  standard  counterpoise  weights  shall  be  placed  on  the  counterpoise  hanger. 
The  weighbeam  shall  then  be  brought  to  an  accurate  balance  condition  by  adding  or 
removing  "error  weights",  and  the  indicated  error  shall  be  taken  as  the  value  of  the 
"error  weights"  so  added  or  removed. 

This  procedure  shall  be  followed,  in  addition  to  the  foregoing,  with  the  hopper 
approximately  one-half  full,  and  again  with  the  hopper  loaded  to  the  scale  capacity  less 
at  least  the  value  of  the  test  load  being  used.  In  the  case  of  all  observations  made  with 
grain  in  the  hopper,  sufficient  time  shall  elapse  before  the  test-weight  load  is  added  or 
removed,  as  the  case  may  be,  to  establish  that  there  is  no  leakage  of  grain  through  the 
hopper  or  garner  gates. 

1704.  Counterpoise-Weight  Tolerances 

Counterpoise  weights  furnished  with  or  belonging  to  a  grain-hopper  scale  shall  be 
separately  tested  by  comparing  them  on  a  sensitive,  equal-arm  balance  with  the  standard 
counterpoise  weights  required  by  Paragraph  1702  hereof.  The  tolerances  to  be  allowed  in 
excess  or  deficiency  on  new  counterpoise  weights  for  a  grain-hopper  scale  shall  be: 


128  Yards   and   Terminals 

Nominal  Value 

of  Weight  Tolerance 

(pounds)  (grains) 

10    10 

8 9 

S    6.S 

4    6 

3    5 

2    4 

1    2.5 

1705.  Sensibility  Reciprocal 

The  sensibility  reciprocal  (SR)  is  the  change  in  load  required  to  turn  the  weigh- 
beam  from  a  position  of  equilibrium  in  the  center  of  the  trig  loop  to  a  position  of 
equilibrium  at  either  limit  of  its  travel.  The  value  of  the  SR  shall  preferably  be  deter- 
mined by  adding  or  removing  "error  weights". 

At  any  load  within  its  capacity,  the  weighbeam  of  a  new  hand-operated  grain- 
hopper  scale  shall  be  in  stable  equilibrium,  and  the  SR  shall  not  exceed: 

Nominal  Capacity 

of  Scale  Permissible  SR 

(pounds)  (pounds) 

18,000  S 

30,000  S 

48,000  10 

72,000  10 

120,000  10 

150,000  10 


Report  on  Assignment  5 

Terminal   Facilities  Required  for  the  Care  of  Diesel 
Locomotive  Equipment 

H.  C.  Lorenz  (chairman,  subcommittee),  C.  J.  Astrue,  A.  L.  Becker,  V.  J.  Bedell,  W.  O. 
Boessneck,  H.  G.  Dalton,  F.  T.  Darrow,  W.  H.  Giles,  W.  J.  Hedley,  W.  H.  Hobbs, 
L.  L.  Lyford,  C.  H.  Mottier,  J.  M.  Metcalf,  J.  N.  Todd. 

General 

Many  Class  I  railroads  employ  some  Diesel-electric  switchers  and  contemplate 
extending  their  use,  and  at  least  17  railroads  are  using  Diesel-powered  trains  for  passenger 
service.  The  use  of  Diesel-electric  locomotives  is  becoming  so  general  that  it  is  desirable 
to  assemble  information  regarding  the  facilities  that  have  been  provided  by  the  railroads 
for  their  proper  care  and  maintenance.  Insofar  as  possible  they  are  using  existing  facil- 
ities but  as  these  are  not  always  adequate  or  suitable,  it  is  necessary  in  many  cases  to 
construct  new  facilities  to  take  care  of  the  immediate  requirements. 

General  Requirements 

For  the  ordinary  servicing  of  a  Diesel-electric  locomotive,  fuel,  sand,  radiator  water 
and  crank-case  oil  must  be  replenished  from  time  to  time  and  the  locomotive  thoroughly 
inspected.  The  ideal  situation  would  be  to  locate  fuel  tanks  or  the  fuel  supply  lines, 
inspection  pit  and  sand  houses  so  that  all  of  this  work  could  be  done  with  one  spotting 


Yards   and    Terminals  129 

of  the  locomotive.  The  inspection  pit  should  be  in  such  a  location  that  the  motors, 
journals,  etc.,  can  be  inspected  while  the  locomotive  is  being  serviced. 

Dependent  upon  local  restrictions,  the  fuel  tanks  may  be  either  above  ground  or 
underground.  With  a  tank  set  above  ground  so  that  its  bottom  is  about  eight  feet  above 
top  of  rail,  gravity  fueling  is  possible.  In  that  case,  however,  fuel  will  have  to  be  pumped 
from  the  tank  car  to  the  storage  tank.  For  this  purpose  an  electric  pump  with  a  capacity 
for  handling  at  least  100  gal.  per  min.  should  be  provided,  and  so  arranged  that  in  case 
of  emergency  the  fuel  can  be  pumped  directly  from  tank  car  to  locomotive.  In  some 
instances  fueling  must  be  done  by  a  pressure  system,  as  gravity  fueling  is  too  slow.  Both 
the  pump  and  the  track  should  be  thoroughly  insulated  to  prevent  any  sparking.  Strainers 
should  be  provided  for  both  the  inlet  and  outlet  hnes  and  should  be  so  installed  that 
they  may  be  readily  removed  for  cleaning,  as  it  is  essential  that  fuel  be  entirely  free 
from  foreign  matter.  A  meter  should  be  placed  on  the  supply  Une  for  the  determination 
of  fuel  consumed  per  unit  of  work  performed,  and  to  measure  the  quantity  of  fuel 
received. 

At  points  where  fuel  oil  is  readily  available,  a  tank  with  a  capacity  of  from  15,000 
to  20,000  gal.  will  generally  be  sufficient.  If  it  is  advisable  to  purchase  oil  in  more  than 
single  carload  lots,  the  storage  capacity  must  be  increased  accordingly. 

A  sand  house  should  be  provided  with  at  least  two  flexible  pipes  of  sufficient  length 
so  that  when  the  locomotive  is  properly  spotted  they  will  reach  all  of  its  sand  boxes. 

The  most  common  repairs  necessary  to  a  Diesel  locomotive,  in  addition  to  tho.^e 
which  can  be  made  at  the  inspection  pit,  are  the  replacement  of  rings  and  cylinder  hners, 
adjustment  of  bearings,  and  turning  of  wheels.  Shop  equipment  must  be  provided  to  the 
end  that  all  of  these  repairs  can  be  made  quickly  and  easily. 

Experience  with  the  care  of  these  locomotives  indicates  that  for  economic  main- 
tenance operations,  faciUties  somewhat  different  from  those  for  steam  locomotives  are 
required.  Operations  should  be  separated.  FaciUties  are  required,  first,  for  running  repairs 
at  outlying  points  and  at  major  terminals,  to  avoid  interference  with  regular  shop  routine; 
and,  second,  for  repair  shops  where  heavy  or  classified  repairs  are  handled.  It  seems 
desirable  that  facilities  for  servicing  Diesel-electric  power  units  should  be  kept  apart  from 
the  coach  yard  facilities  and  be  properly  housed.  As  to  track  layout,  turntable,  etc.,  the 
normal  equipment  used  in  the  steam  locomotive  terminal  will  also  serve  the  Diesel 
locomotives. 

Facilities  for  Running  Repairs 

Truck  removal  is  occasionally  required,  but  there  is  frequent  need  for  the  removal 
of  wheels,  as  wheel  and  journal  troubles  develop.  The  motors  also  must  be  removed 
occasionally.  It  seems,  therefore,  that  the  minimum  requirement  is  for  a  two-screw 
drop-pit  table,  equipped  with  a  drop-pit  machine  of  sufficient  capacity  for  the  power 
handled,  using  detachable  table  tops,  6  ft.  6  in.  across  the  pit  and  9  ft.  6  in.  parallel 
with  the  pit,  having  a  drop  of  4  ft.,  with  a  floored  depression  of  at  least  12  in.  between 
the  rails  of  the  table  top.  The  adjacent  floor  should  be  level  with  the  base  of  rail  to 
obtain  all  working  space  possible.  A  checkered  plate  floor  is  desirable.  The  pit  should  be 
so  located  that  any  wheel  of  the  Diesel  locomotive  may  be  removed  without  moving  the 
locomotive  beyond  the  doors  or  without  fouling  adjacent  tracks. 

Service  tracks  should  have  inspection  pits,  and  some  roads  recommend  a  small  pit 
in  the  release  track  large  enough  to  accommodate  workmen  when  removing  such  parts 
as  motors,  gears,  etc.  The  inspection  and  drop  pits  should  be  adequately  lighted  and  the 
drop  pits  should  be  equipped  with  steps  and  effectively  drained. 


130 Yards    and    Terminals 

As  parts  being  handled  have  considerable  weight,  it  is  recommended  that  a  light 
traveling  crane  be  provided.  It  should  be  of  the  one,  two  or  three-motor  type,  afford 
an  adequate  lift,  and  be  operated  from  the  floor  if  it  is  to  serve  only  the  release  track 
If  made  to  serve  two  or  more  tracks,  it  should  clear  the  tops  of  the  locomotives,  so  that 
it  can  handle  the  interior  parts.  The  crane  bridge  should  be  parallel  with  the  length  of 
the  drop  pit,  and  should  pass  over  the  drop  pit  and  its  release  track. 

A  western  railroad  has  installed  a  two-screw  drop-pit  table  with  a  detachable  top. 
6  ft.  6  in.  across  the  pit  by  9  ft.  6  in.  parallel  with  the  pit,  of  3S-ton  capacity,  4-ft.  drop 
and  a  speed  of  3  ft.  per  min.  A  10-ton  overhead  traveling  crane  serves  the  release  track 
only,  to  handle  parts  removed. 

Diesel-Electric  Shops  for  Heavy  Repairs 

The  width  of  the  building  will  be  determined  by  the  number  of  tracks,  usually  two 
or  three  at  24-ft.  centers,  with  ample  space  each  side.  The  length  will  depend  upon  the 
number  of  locomotives  being  handled,  with  an  adequate  space  between  and  at  the  ends 
of  locomotives.  Approximately  opposite  the  center  of  the  building  a  machine  shop  bay 
should  be  provided,  including  space  for  an  electric  shop,  air  brake  room,  tool  room,  paint 
shop,  wash  room,  toilets,  offices,  etc.,  with  a  broad  walkway  extending  transversely  across 
the  main  building  and  the  tracks,  for  convenient  access  to  the  machine  shop  bay.  There 
should  be  an  overhead  traveling  crane  of  ample  capacity,  cab  operated,  with  a  runway 
the  full  length  of  the  building  at  a  sufficient  height  to  handle  parts  from  within  the 
locomotive  as  well  as  locomotive  trucks,  etc. 

Inspection  pits  should  be  of  sufficient  depth,  with  steps  at  each  end,  and  adequately 
lighted  and  drained.  The  floor  may  be  level  with  the  top  of  rail.  Some  railroads  prefer 
to  have  the  top  of  rail  about  one  foot  above  the  floor  to  facilitate  truck  repairs,  in  which 
case  the  cross  walk  should  be  level  with  top  of  rail,  with  ramps  to  the  lower  level  on 
each  side.  Provision  should  be  made  for  jacking  at  any  point  on  both  sides  of  the  tracks. 

Truck  and  Wheel  Removing  Equipment 

Various  types  of  equipment  are  now  being  used  to  remove  trucks  and  wheels.  The 
four  principal  types  are  enumerated  below,  together  with  a  few  examples  indicating 
variations  and  combinations  of  the  several  types. 

1.  Electric  high-lift  portable  jacks  for  the  removal  of  trucks  seem  to  be  preferred 
at  this  time,  as  a  pit  is  not  required  and  it  is  not  necessary  to  spot  the  locomotive 
accurately.  However,  head  room  should  be  considered  and  the  necessity  for  disengaging 
connections  for  both  trucks  where  only  one  is  to  be  removed.  Jacks  of  2S-ton  capacity 
are  obtainable  for  switchers,  and  of  3S-ton  capacity  for  passenger  units,  with  4-ft.  lift, 
but  higher  lift  may  be  obtained  if  necessary.  When  raising  the  locomotive  body,  the  load 
is  carried  on  a  base  casting  instead  of  the  wheels  of  the  jack.  The  column  with  side 
lifting  bracket  and  large  base  gives  greater  stability  and  safety  than  the  conventional 
pedestal  jack.  Each  jack  is  equipped  with  a  motor,  and  push-button  control.  Through 
proper  plug-ins  of  the  control  cable,  each  jack  can  be  operated  from  its  own  push-button 
station  or  one  pair  or  two  pairs  can  be  operated  simultaneously  from  a  single  push- 
button station. 

An  eastern  railroad  handles  its  locomotives  at  Cleveland  with  four  of  these  jacks. 
A  steel  corporation  at  Cleveland  uses  four  of  the  2S-ton  jacks  for  handling  its  switchers, 
and  a  southwestern  railroad  uses  four  35-ton  jacks  for  its  streamlined  passenger  units. 

2.  Two  traveling  cranes  of  ample  capacity  may  be  used,  one  at  each  end  of  the 
locomotive,  for  raising  the  locomotive  body  for  truck  release.  For  large  scale  operations, 
where  numerous  units  are  handled,  the  idea  is  not  objectionable;  however,  for  most  shops 
it  is  generally  believed  that  the  cost  would  be  too  high. 


Yards   and   Terminals 131 

3.  A  drop-pit  table  of  100-ton  capacity  with  detachable  table  tops,  22  ft.  long  across 
the  pit,  by  12  ft.  wide  parallel  with  the  pit,  provides  an  economical  arrangement.  The 
tops  should  be  of  the  plain  type,  with  a  depression  of  approximately  two  feet  between 
the  rails  of  the  top,  and  checkered  plate  flooring  outside  the  rails,  either  at  the  level  of 
the  base  or  top  of  the  rail  as  required.  Such  a  machine  should  have  a  hoisting  speed  of 
two  feet  per  minute,  should  be  motor  racked  with  a  speed  of  25  ft.  per  min.,  and  should 
be  equipped  with  a  spring-operated  cable  take-up  reel.  The  truck  drop  should  be  not 
less  than  four  feet. 

Two  of  these  machines  are  in  service  on  a  western  railroad,  one  at  Denver  and  the 
other  at  Los  Angeles.  Still  another  is  in  service  on  an  eastern  railroad  at  Boston,  for 
handling  trucks  of  a  streamlined  passenger  train.  This  type  of  machine  is  a  satisfactory 
facility  for  railroads  with  a  limited  number  of  locomotives,  and  experience  has  demon- 
strated that  it  can  serve  three  service  tracks  economically. 

In  1934,  a  western  railroad  installed  a  drop  pit  and  table  and  a  crane  for  handling 
trucks  from  power  units,  coaches  and  sleepers,  adjacent  to  its  passenger  yard  at  Chicago. 
For  inspection  under  the  cars,  a  short  inspection  pit  was  installed,  together  with  fuel 
oil  faciUties,  condensate  lines  for  furnishing  water  to  heating  system  boilers,  aircondi- 
tioning  outlets,  etc.,  and  special  connections  for  water,  steam  and  air.  Since  that  time 
the  railroad  has  installed  longer  inspection  pits,  larger  capacity  drop  tables,  car  pullers, 
etc.,  and  has  provided  similar  facilities  at  MinneapoHs,  St.  Louis,  Denver  and  Lincoln, 
Nebr. 

4.  A  southwestern  railroad  employs  a  transfer  table  for  the  handling  of  Diesel  loco- 
motive trucks  at  its  engine  terminal  in  Chicago,  where  an  entire  section  is  used  for 
locomotive  repairs.  The  procedure  is  to  run  the  power  truck  on  the  transfer  table,  and 
jack  up  one  end  of  the  locomotive  about  eight  inches  by  means  of  power-operated  jacks. 
The  transfer  table  is  then  racked  sidewise  to  a  releasing  track  where  the  removed  power 
truck  is  rolled  off  to  an  overhead  10-ton  crane  for  dismantling. 

The  objection  to  this  low  cost  installation  is  that  there  is  a  tendency  to  center  plate 
clamping  action  on  short  wheel  base  switchers,  when  only  one  end  of  the  locomotive  is 
raised  eight  inches  (or  higher  on  some  locomotives  because  of  skirting) .  The  open  pit  is 
also  objectionable. 

A  belt  railroad,  operating  in  a  large  Gulf  city,  has  adapted  its  steam  locomotive 
terminal  shop  for  the  servicing  and  repair  of  Diesel-electric  switching  locomotives. 

For  turnaround  points  where  heavy  repairs  are  not  made,  some  railway  officers 
recommend  the  two-screw  drop  table,  previously  described.  This  machine  would  be 
accessible  for  quick  work  on  running  repairs  without  interfering  with  regular  shop 
equipment.  It  seems  to  be  the  ideal  equipment  for  removing  single  pairs  of  wheels  with 
or  without  motors. 

Horse-Shoe  or  Sectional  Drop  Table  for  Shops 

Some  roads  prefer  a  drop  table  of  approximately  100-ton  capacity,  serving  two 
service  tracks,  because  it  requires  less  head  room  and  less  power  and  is  faster  in  oper- 
ation than  jacks.  Each  track  is  equipped  with  a  main  top,  having  within  the  top  either 
one  or  two  auxiliary  tops,  and  a  release  track  is  provided  between  the  two  service  tracks. 
With  this  arrangement,  four  and  six-wheel  trucks  can  be  dropped  on  the  main  and 
auxiliary  tops,  and  individual  pairs  of  wheels  on  one  of  the  auxiliary  tops.  The  length 
of  the  main  top  is  22  ft.  across  the  pit,  while  the  length  of  the  auxiliary  top  is  6  ft.  6  in. 
to  7  ft.  6  in. 

A  northwestern  railroad  has  a  table  of  this  type  at  its  Chicago  shops;  another  rail- 
road has  one  in  Minneapolis,  both  being  used  to  handle  streamline  Diesel  locomotives. 
An  eastern  railroad  also  uses  a  table  of  this  type. 


132 Yards   and   Terminals 

Other  Equipment  Necessary 

Equipment  usually  required  by  the  mechanical  department  and  which  should  be 
considered  in  connection  with  the  design  of  faciUties,  includes  the  following: 

An  hydraulic  press  of  sufficient  capacity  (approximately  300  tons)  to  remove 
and  apply  rolled  steel  wheels  on  axles  equipped  with  gears. 

A  wheel  lathe  of  a  size  sufficient  to  turn  locomotive  wheels. 

Portable  grinding  machines  to  be  used  in  conjunction  with  lathes;  a  boring 
mill  and  a  planer  for  grinding  valves,  valve  seats,  rollers,  and  for  miscellaneous 
operations  requiring  extremely  accurate  reconditioning. 

Engine  lathes  which  may  be  used  for  turning  commutators  and  contact  segments 
on  reversers,  boring  mills,  planers  and  shapers  similar  to  those  now  used  in  the 
maintenance  of  steam  locomotives. 

Most  repair  parts  when  purchased  are  finished  by  the  manufacturers,  and  the 
greater  part  of  repair  work  consists  in  assembling  and  accurate  adjustment  of  such  parts. 

Platforms  for  Working  at  Locomotive  Deck  Level 

The  Diesel-electric  locomotive  is  different  from  the  steam  locomotive  in  that  it  has 
most  of  its  mechanism  above  the  deck,  and  there  is  a  considerable  loss  of  time  if  the 
workers  must  frequently  move  to  the  floor  and  return.  For  this  reason,  fixed  or  movable 
platforms  as  high  as  the  locomotive  deck,  and  with  steps  or  risers,  should  be  provided. 
The  platforms  should  contain  lockers,  benches,  bench  tools  and  small  repair  parts. 

Requirements  Desirable  in  Diesel- 
Electric  Locomotive  Details  to  Facilitate  Repairs 

To  faciUtate  making  repairs  on  Diesel-electric  locomotives  conventional  jacking 
pads  should  be  located  at  the  ends  of  the  body  bolsters  at  the  middle  of  the  truck. 
Many  roads  lack  crane  facilities  and  must  depend  on  electric  high-lift  jacks  or  drop 
tables  for  removing  wheels  and  trucks.  For  electric  high-lift  jacks,  the  jacking  pads  at 
the  ends  of  the  body  bolsters  may  be  used.  Unfortunately,  some  manufacturers  of  Diesel- 
electric  locomotives  have  placed  cab  ladders  at  this  point  with  the  result  that  they  must 
be  removed  before  the  jacks  can  be  placed  in  position.  Furthermore,  these  ladders  foul 
the  locomotive  truck  if  the  truck  transfer  table  is  used,  and  they  must  be  removed  before 
the  trucks  can  be  moved  sidewise.  Ladders  should  be  located  on  the  side  sills  beyond 
the  ends  of  the  trucks.  If  jacks  are  to  be  used  in  the  removal  of  trucks,  the  bodies  of 
Diesel-electric  locomotives  should  have  a  width  of  at  least  one  foot  in  excess  of  the 
widest  part  of  the  truck  so  as  to  provide  necessary  clearance  between  the  jacks  to  permit 
the  rolling  of  the  trucks  from  beneath  the  locomotive. 

When  drop-pit  tables  are  used,  it  is  highly  important  to  place  additional  jacking 
pads  on  the  side  sills  immediately  behind  the  trucks,  thus  making  it  possible  to  support 
the  locomotive  body  at  the  side  walls  of  the  pit  while  the  truck  is  being  lowered.  In 
doing  work  of  this  kind  on  a  drop-pit  table,  the  jacking  pads  at  the  bolsters  are  over 
the  pit  and  are  therefore  of  no  value. 

Where  possible,  Diesel-electric  switchers  should  have  a  set  of  jacking  pads  at  the 
extreme  end  of  the  locomotive  near  or  at  the  end  sill.  All  types  of  Diesel-electric  loco- 
motives should  be  designed  so  that  the  ends  may  rest  on  shop  trucks  for  movement  to  a 
new  location  after  the  regular  trucks  have  been  removed. 

It  is  recommended  that  the  pedestals  on  the  trucks  of  switch  engines  be  so  placed 
that  a  thick  shoe  can  be  inserted,  making  it  possible  after  this  shoe  is  removed  to 
advance  a  pair  of  wheels,  either  with  or  without  the  motor,  far  enough  for  easy  removal. 


This  report  is  offered  as  information. 


Yards   and   Terminals  133 


Report  on  Assignment  6 

Classification  Yards,  Collaborating  with  Committee  16 — Economics 
of  Railway  Location  and  Operation 

G.  F.  Hand  (chairman,  subcommittee),  C.  E.  Armstrong,  J.  E.  Armstrong,  C.  J.  Astrue, 
Hadley  Baldwin,  W.  O.  Boessneck,  N.  C.  L.  Brown,  H.  F.  Burch,  W.  F.  Cummings, 
R.  B.  Elsworth,  W.  H.  Giles,  R.  J.  Hammond,  M.  J.  J.  Harrison,  E.  M.  Hastings, 
W.  H.  Hobbs,  E.  T.  Johnston,  E.  K.  Lawrence,  L.  L.  Lyford,  C.  A.  Mitchell,  C.  H. 
Mottier,  H.  C.  Propst,  W.  B.  Rudd,  W.  C.  Sadler,  C.  U.  Smith,  J.  N.  Todd,  R.  W. 
Willis. 

This  year  the  subcommittee  has  selected,  under  its  general  assignment,  the  "Study 
of  the  Departure  End  of  the  Classification  Yard",  for  the  purpose  of  discussing  and 
setting  down  certain  factors  of  design  bearing  on  the  track  arrangement  and  operation 
of  this  portion  of  hump  classification  yards  that  should  receive  careful  consideration  so 
as  to  permit  prompt  and  economical  handling  of  cars. 

During  the  last  ten  years  there  have  been  radical  changes  in  the  method  of  oper- 
ation of  the  railroads  as  a  whole,  which  have  materially  affected  the  makeup  of  trains 
and,  hence,  the  method  of  handling  cars  in  yards.  The  decrease  in  total  time  for  freight 
from  consignor  to  consignee  occasions  not  only  higher  road  speeds  and  more  expeditious 
handling  through  yards,  but  also  the  almost  universal  makeup  of  trains  of  more  than  one 
classification  or  commodity.  Whereas  formerly  it  was  often  the  practice  to  hold  cars  of 
a  particular  classification  until  a  trainload  of  that  classification  was  available,  this  is  not 
now  the  practice  except  with  a  very  few  commodities.  This  factor  materially  alters  the 
operation  of  building  up  trains  for  dispatching  from  a  hump  classification  yard  as  com- 
pared with  the  method  that  was  probably  in  effect  when  the  yard  was  built. 

Proper  coordination  of  the  layout  of  a  particular  yard  and  the  method  of  making 
up  and  dispatching  trains  from  the  departure  end  of  the  yard,  requires  investigation  of 
the  following  possibilities: 

1.  A  sufficient  number  of  the  classification  tracks  each  long  enough  to  hold  a 
full  length  outgoing  train,  so  that  trains  can  be  dispatched  direct  from  these  long 
classification  tracks. 

2.  Classification  tracks  with  lead  tracks,  such  that  the  combined  length  of  a 
longer  classification  track  and  a  lead  track  will  be  sufficient  for  a  full  length  out- 
going train  and  permit  dispatching  therefrom  without  interfering  with  other  yard 
operations. 

3.  Comparatively  short  classification  tracks  and  separate  departure  tracks,  the 
trains  to  be  made  up  in  and  dispatched  from  the  departure  tracks. 

By  means  of  a  questionnaire  and  discussions  with  operating  men,  information  was 
obtained  regarding  the  design  and  operation  of  representative  hump  classification  yards, 
particularly  as  to  whether  trains  are  made  up  in  and  dispatched  from  the  classification 
tracks  or  whether  separate  departure  tracks  are  used  for  making  up  and  dispatching 
trains,  and  the  advantages  and  disadvantages  of  both  methods  in  relation  to  the  effect 
on  economical  handling  and  prompt  dispatch  of  trains. 

The  following  information  in  respect  to  existing  hump  classification  yards  was 
developed: 

1.  Quick   handhng   in   the   classification   yard   and   quick   dispatch   of   outgoing 

trains  are  of  prime  importance. 


134 Yards   and   Terminals 

2.  The  factors  which  govern  the  necessity  for  departure  tracks  in  addition  to 
the  classification  tracks,  are  the  number  of  cars  to  be  handled  in  given  periods  of 
time,  the  number  of  classifications  to  be  made,  and  the  length  of  the  classification 
tracks. 

3.  It  is  economical  in  time  and  cost  to  make  up  and  dispatch  trains  from  the 
classification  tracks  where  there  are  a  sufficient  number  of  such  tracks  each  long 
enough  for  a  full  length  outgoing  train,  or  where  there  are  lead  tracks  at  the  out- 
going end,  so  that  a  train  can  be  made  up  on  a  classification  track  and  a  lead  track 
without  interfering  with  other  yard  operations. 

4.  With  the  combination  of  short  classification  tracks  and  a  large  number  of 
cars  to  be  handled  in  a  given  period  of  time,  it  becomes  desirable  to  make  up  trains 
on  separate  departure  tracks. 

5.  The  desirability  of  separate  departure  tracks  becomes  more  pronounced  as 
the  number  of  classifications  exceeds  the  number  of  classification  tracks. 

6.  Making  up  trains  for  divergent  routes  may  make  separate  departure  tracks 
necessary,  even  though  some  trains  are  made  up  and  dispatched  directly  from 
classification  tracks. 

7.  In  some  cases  departure  tracks  have  been  discontinued  because  they  are  no 
longer  needed,  due  to  a  reduction  in  the  number  of  cars  passing  through  the  yard 
and  changes  in  the  methods  of  operation.  The  operation  of  so-called  "mainliners" 
has,  in  itself,  reduced  the  number  of  cars  passing  through  certain  yards. 

In  considering  the  information  obtained  from  this  study,  as  presented  above,  it 
should  be  kept  in  mind  that  numerous  existing  hump  classification  yards  have  been 
designed  and  built  for  a  considerably  larger  volume  of  traffic  than  is  now  being  handled 
through  them,  and  which  are  generally  being  used  as  built  to  avoid  the  expenditure 
which  might  be  necessary  to  permit  changes  in  the  method  of  operation. 

Conclusions 

Proper  design  and  operation  in  respect  to  the  making  up  and  dispatching  of  out- 
going trains  from  a  hump  classification  yard  demand  a  study  of  all  the  factors  involved 
in  the  above  seven  points,  which,  under  existing  conditions,  represent  good  practice. 


This  report  is  presented  as  information,  with  the  recommendation  that  the  general 
subject  of  classification  yards  be  continued. 


Report  on  Assignment  7 

Terminal  Facilities  Required  for  the  Washing  of  Passenger 
Cars  Mechanically 

J.  M.  Metcalf  (chairman,  subcommittee),  C.  E.  Armstrong,  A.  L.  Becker,  W.  O.  Boess- 
neck,  H.  F.  Burch,  W.  H.  Giles,  W.  J.  Hedley,  H.  C.  Lorenz,  C.  H.  Mottier, 
E.  E.  R.  Tratman. 

Mechanical  washing  of  passenger  equipment  is  quite  extensively  practised  on  buses 
and  trolley  cars  by  urban  and  interurban  transportation  companies.  Comparatively  few 
steam  railroads  have  installed  machines  for  that  purpose.  Two  which  have  done  so  report 
a  substantial  saving  in  cost  compared  with  hand  washing  where  there  is  a  sufficient 
number  of  cars  to  be  washed  and  where  the  layout  is  such  as  to  facilitate  the  operation 


Yards   and    Terminals 135 

during  the  movement  of  cars  between  passenger  station  and  coach  yard  without  delay 
and  extra  switching  expense.  The  saving  in  labor  of  the  washing  crew  must  be  balanced 
against  the  switching  service  handhng  cars  through  the  washer.  With  increasing  labor 
costs,  and  the  desirabiUty,  for  advertising  purposes,  of  keeping  passenger  equipment  clean 
and  attractive,  it  seems  likely  that  other  roads  may  be  interested  in  such  installations  at 
terminals  where  large  numbers  of  passenger  cars  are  to  be  cleaned. 

The  usual  installation  for  the  mechanical  washing  of  railroad  passenger  cars,  as  well 
as  hghter  passenger  equipment,  consists  of  cylindrical  revolving  brushes  kept  wet  by 
sprays,  each  operated  by  an  independent  motor,  supported  in  a  vertical  position  by  rigid 
frames  on  each  side  of  the  track  on  which  the  cars  move  for  washing.  Springs  force  the 
brushes  against  the  car  sides  during  the  washing  operation,  and  they  may  be  so  arranged 
as  to  tip,  within  Umits,  out  of  the  vertical,  so  as  to  keep  the  brushes  with  full  bearing 
against  the  sides  of  the  car  when  tilted.  One  brush  on  each  side  usually  extends  the  full 
height  of  the  car  side,  and  a  shorter  brush,  usually  revolving  in  the  opposite  direction, 
is  designed  for  washing  the  windows.  Additional  inclined  brushes  may  be  added  for 
washing  car  roofs  if  required.  No  provision  is  made  for  washing  the  ends  of  cars.  This 
must  be  done  by  hand  work  as  a  supplemental  operation.  Outside  mechanical  washing  is 
usually  discontinued  in  freezing  weather. 

In  addition  to  the  brush  sprays,  at  a  short  distance  beyond  the  brushes,  in  each 
direction  along  the  track,  are  sets  of  vertical  pipes  equipped  with  water  sprays,  one  set 
to  wet  the  car  sides  before  they  reach  the  brushes  and  the  other  to  rinse  them  as  they 
leave  the  washer.  With  such  an  arrangement  cars  can  be  washed,  as  they  move  in  either 
direction  past  the  washing  machine,  at  speeds  up  to  about  one  car  a  minute. 

The  installation  generally  includes  a  floor  of  concrete,  provided  with  drains,  to  keep 
the  water,  as  it  drops  from  the  car  sides,  from  saturating  the  track  structure.  Some  of 
the  bus  and  street  car  washers  are  controlled  automatically  by  an  electric  eye  or  by  a 
low  voltage  rail  control,  but  hand-operated  switch  control  is  more  generally  used  in  the 
steam  railroad  installations. 

One  railroad  operating  such  a  washing  machine  has  installed,  in  addition,  a  short 
distance  ahead  of  it,  what  is  known  as  a  "scrubbing  machine",  for  loosening  the  dirt, 
when  required,  in  advance  of  washing.  This  machine  is  equipped  with  horizontal  brushes 
which  move  up  and  down  the  car  sides  in  conjunction  with  a  spray  of  cleaning  fluid. 

Among  the  advantages  claimed  for  mechanical  washing  are  the  following: 

1.  Reduction  of  labor  costs 

2.  Saving  of  time 

3.  Concentration  of  most  of  the  car  washing  in  one  place,  with  suitable  drainage, 
thus  helping  to  keep  the  remainder  of  the  coach  yard  dry  and  clean 

4.  Improved  appearance  and  reduced  deterioration  of  car  finish,  due  to  more  efficient 
washing 

The  following  are  suggested  as  desirable  features  to  be  incorporated  in  installations 
for  mechanical  washing  of  passenger  equipment: 

1.  Location  on  tangent  on  a  track  connected  at  both  ends,  so  arranged  as  to  facilitate 
washing  of  cars  while  moving  between  station  and  coach  yard,  without  extra 
switching  movement  and  without  interfering  with  other  yard  and  switching 
operations 

2.  Designed  for  washing  with  equal  efficiency  while  cars  are  moving  by  the  machine 
in  either  direction 

3.  Brushes  on  each  side  of  track  wet  by  sprays  and  arranged  to  maintain  the  re- 
quired pressure  against  the  car  sides,  and  to  accommodate  probable  variations  in 
widths  of  cars  and  tilting  of  cars  out  of  the  vertical 


136 Yards   and   Terminals 

4.  Separate  brushes  for  car  sides  and  windows,  arranged  to  reach  effectively  all  parts 
to  be  washed 

5.  Water  sprays  in  each  direction  along  the  track  beyond  the  brushes,  designed  to 
wet  the  sides  of  cars  thoroughly  before  and  after  washing 

6.  Concrete  or  other   floor  on  the  track  at  the  washing  machine,   with  adequate 
drainage  facilities 

7.  Brushes  of  conventional  design   to  facilitate  ready   replacement,  and  with   only 
enough  bristles  to  provide  fluffiness. 


This  report  is  offered  as  information. 


Report  on  Assignment  8 

Terminal  Facilities  Required  for  the  Handling  o£  Highway  Trucks 
and  Trailers  on  and  off  Railroad  Cars 

H.  L.  Ripley  (chairman,  subcommittee),  J.  R.  W.  Ambrose,  J.  E.  Armstrong,  C.  J. 
Astrue,  A.  L.  Becker,  H.  F.  Burch,  W.  F.  Cummings,  F.  T.  Darrow,  R.  B.  Elsworth, 
R.  J.  Hammond,  G.  F.  Hand,  W.  J.  Hedley,  L.  L.  Lyford,  C.  H.  Mottier,  H.  M. 
Roeser,  W.  B.  Rudd,  W.  C.  Sadler,  E.  E.  R.  Tratman. 

This  is  a  new  assignment  to  the  Yards  and  Terminals  committee  and,  relatively, 
is  a  new  venture  by  the  railroads  in  an  endeavor  to  recover  some  of  the  freight  transport 
tonnage  that  has  been  lost  to  the  over-the-road  trucks  and  trailers.  It  shows  promise 
of  success,  and  this  report  describes  facilities  that  are  in  use  on  some  of  the  railroads. 

Accessibility  and  Appointments 

The  terminal  must  be  conveniently  located  and  readily  accessible  from  the  industrial 
centers;  must  be  provided  with  proper  driveways  and  parking  space,  special  lighting, 
and  with  a  ramp  and  loading  platform  located  at  the  end  of  one  or  more  stub-end 
tracks  where  specially  equipped  flat  cars  may  be  set  up  in  tandem,  all  as  more 
particularly  described  below. 

Loading  Platform  and  Ramp 

Opinions  of  operating  men  handling  the  movement  differ  as  to  the  best  gradient  for 
the  loading  ramp  and  best  length  for  the  level  platform  between  the  top  of  the  ramp  and 
the  first  of  the  flat  cars  set  up  in  tandem.  A  western  road  uses  40  ft.  and  says  that  is 
not  too  much.  An  eastern  road  uses  IS  ft.  and  the  crew  at  one  of  its  terminals  says  it  is 
enough.  However,  at  two  other  terminals  the  crews  think  that  the  distance  is  short 
for  easy  maneuvering,  although  the  difficulty  is  encountered  only  in  loading  the  last 
trailer. 

Curbs  or  timber  guides  properly  located  are  used  to  prevent  spills  and  are  helpful 
in  centering  the  vehicles,  especially  the  last  one  nearest  the  platform.  These  guide  timber 
curbs  are  set  along  the  edge  of  the  ramp  and  platform  and  on  the  cars,  using  the  regular 
stake  pockets  to  hold  them  in  place. 

Ramp  Gradient 

The  gradient  recommended  by  a  western  road  which  is  performing  this  kind  of 
service  in  the  Chicago  district  is  the  one  they  are  accustomed  to  use,  namely,  7.5  percent. 
On  the  other  hand  an  eastern  road,  where  the  service  has  been  in  operation  over  two 


Yards    and    Terminals 137 

years,  uses  a  12  percent  gradient  successfully  and  without  difficulty.  A  plan  illustrating 
this  construction  and  showing  further  data  is  filed  with  the  secretary  of  the  American 
Railway  Engineering  Association.  Such  a  ramp  and  platform  for  a  single-track  set-up, 
built  of  timber,  would  cost  from  $2,000  to  $3,000,  depending  upon  location  and  local 
conditions. 

Bridge  Aprons 

Aprons  are  used  to  bridge  the  gap  between  the  platform  and  the  first  car  and  tin- 
gaps  between  the  cars  themselves.  These  aprons  are  hinged  to  one  end  of  each  car. 

Handling  and  Loading 

A  truck  or  trailer  is  backed  up  the  ramp  and  over  the  cars  by  and  ahead  of  the 
tractor  and  moved  to  the  end  of  the  string  or  to'  the  last  empty  space.  Care  must  be 
exercised  in  handling  the  vehicles  to  insure  that  they  are  not  "bumped",  as  that  may 
cause  air  connections,  markers,  tail  lights  and  the  like  to  be  knocked  off  or  damaged. 
Sand  boxes  should  be  provided  for  use  in  case  the  ramp  or  platform  becomes  slippery 
from  ice  or  other  causes. 

Blocking  and  Fastening 

Blocks,  chocks  and  wedges  are  usually  provided  in  ample  quantities.  Sets  of  soft 
wood  blocks  about  5J^  in.  by  12  in.  by  2  ft.,  hardwood  blocks  2  in.  by  8  in.  by  17  in., 
hardwood  wedges  4  in.  by  4  in.  by  17  in.,  some  boards  1  in.  by  8  in.  by  17  in.,  and  a 
quantity  of  wheel  chocks  of  hardwood  cut  8  in.  by  12  in.  by  17  in.,  shaped  on  a  radius 
to  fit  the  contour  of  the  tires  and  fastened  to  the  car  floor,  have  proved  convenient 
for  regular  and  emergency  service. 

Two  or  three  wooden  horses  three  feet  four  inches  high  are  usually  provided  to 
be  placed  under  the  front  end  of  semi-trailers  when  the  landing  gear  fails  to  work 
when  detached  from  the  road  tractor  or  when  the  trailer  becomes  detached  in  handling 
and  the  front  end  drops  down. 

Anchor  and  sway  chains  equipped  with  turnbuckles  (with  check  nuts,  as  provided 
in  water  ferry  service)  are  frequently  used,  but  are  not  relied  upon  alone  to  hold  the 
unit  in  position,  as  the  construction  of  the  vehicle  is  too  frail  to  take  the  eccentric  stresses. 
Moreover,  a  flat  tire  enroute  might  loosen  the  chains,  allow  the  vehicle  to  shift  position 
and  cant  over  enough  to  collide  with  fixed  structures  along  the  right-of-way,  so  the 
wheels  are  securely  blocked  and  the  weight  supported  on  the  jacks,  horses  or  blocking; 
usually  on  the  three  jacks  as  described  below. 

The  small  wheels  on  the  landing  gear  have,  in  a  few  instances,  broken  the  car  floor 
and  it  is  desirable  that  a  steel  plate  be  so  placed  to  receive  them  as  to  take  the  shock, 
spread  the  load  and  protect  the  floor. 

On  the  flat  car  itself  is  placed  a  steel  channel,  bored  for  dowel  pins  at  about  4-in. 
centers,  and  hardwood  blocks  dowelled  to  fit  the  channel  borings  are  placed  therein  to 
take  the  foot  of  the  front  screw  jack,  faced  at  a  slight  angle  towards  the  back  of  the 
unit;  the  channel  assembly  itself  being  so  placed  that  it  laps  past  the  center  of  the  car, 
forward  about  18  in.  and  back  about  8  ft. 

Another  similar  slot  plate  or  channel  assembly  about  six  feet  long  is  set  at  the  front 
of  the  flat  car.  These  assemblies  allow  for  spotting  vehicles  of  differing  lengths.  The 
hook  brackets  attached  to  the  frame  of  the  vehicle  itself  are  spotted  in  locations  specified 
by  the  railroad,  for  the  same  reason. 

At  the  rear  of  the  vehicle  two  screw  jacks  are  used,  set  against  a  wooden  beam  span- 
ning across  their  tops  and  bearing  against  the  underframe  of  the  vehicle;  thus  forming  a 


138 Yards    and    Terminals 

yoke  and  preventing  side-sway,  independent  of  the  chains.  At  the  front,  the  screw  jack 
set  against  the  center  block  bears  against  a  plate  attached  to  the  frame  of  the  vehicle 
located  just  behind  the  center  pin. 

In  some  cases  close  clearances  may  make  it  necessary  to  provide  flat  cars  of  special 
construction  in  order  to  permit  the  handling  of  vehicles  with  higher  loads  than  could 
be  transported  on  a  standard  flat  car.  Additional  clearance  can  be  gained  by  providing 
channels  in  the  floor  of  the  car  to  take  the  wheels  of  the  vehicle.  About  six  inches  can 
be  gained  thereby,  but  the  opportunity  for  gain  is  limited  because  of  the  low  housings 
on  the  vehicles  themselves. 

A  plan  illustrating  this  construction  and  showing  further  details  is  filed  with  the 
secretary  of  the  American  Railway  Engineering  Association. 

Emergency  Equipment 

Portable  jacks  are  supplied  to  the  loading  crew.  A  convenient  set  used  at  some 
terminal  loading  points  includes  two  2S-ton  ratchet  jacks,  one  3S-ton  ratchet  jack  and 
one  low  journal  jack. 

Inspection 

Each  unit  is  inspected  carefully  before  acceptance  for  loading  and  any  defects  or 
evidence  of  a  damaged  condition  of  a  vehicle  or  its  lading  noted  and  recorded.  The  in- 
spection determines  whether  any  part  of  the  vehicle  or  its  load  projects  outside  of  the 
proper  clearance  limit,  whether  the  canvas  tarpaulin  on  open-tops  is  tight  and  securely 
fastened  down,  whether  the  brackets  attached  to  the  unit  for  hitching  the  hold-down 
chains  are  in  good  condition,  and  whether  the  anchors  and  sway  chains  themselves  are 
also  in  good  condition  and  properly  fastened. 

In  no  case  should  any  of  the  lading  of  the  trailer  project  onto  the  tailboard  and  all 
tailboards  should  be  raised  and  fastened  securely  before  loading  the  trailer  on  the 
flat  car. 

Vehicle  Attachments 

Thrust  plates  and  brackets  attached  to  the  vehicle  are  made  by,  and  their  location 
specified  by,  the  railroad;  and  the  truck  operators  have  them  attached  to  the  unit  as 
directed. 

Working  Force 

The  loading  and  unloading  of  the  trailers  on  and  off  the  cars  is  usually  done  by  a 
tractor  operator  regularly  assigned  to  this  work,  either  by  the  railroad  or  by  the  truck- 
ing contractor,  as  the  operation  of  backing  the  trailers  up  the  ramp  and  spotting  them 
accurately  on  the  cars  is  a  "tricky"  job  and  is  difficult  for  an  operator  who  is  not 
experienced  in  such  work. 

Experience  shows  that  a  gang  consisting  of  an  inspector  foreman  in  charge  and 
three  helpers  will,  together  with  the  tractor  operator,  pick  up,  deliver  and  spot  a  unit, 
centered  in  position  on  the  flat  car,  in  about  eight  to  fifteen  minutes  in  good  weather, 
as  an  average.  The  tractor  is  then  detached,  run  off  and  is  ready  for  the  next  unit  to 
be  placed,  while  the  gang  is  blocking,  jacking  and  chaining  the  first  unit  solidly  in  place 
on  the  flat  car.  This  blocking,  jacking  and  chaining  takes  from  seven  to  ten  minutes  and 
the  gang  is  then  ready  for  the  next  unit. 

Lighting 

The  lighting  is  highly  important  and  should  have  careful  attention.  It  has  been 
found  by  experience  that  flood  lighting  is  needed  for  general  illumination  and  that  a 
spot  light  attached  to  the  undercarriage  of  the  loading  tractor,  near  the  left  rear  wheel 


Yards   and   Terminals 139 

and  pointing  to  the  rear,  is  very  helpful,  and  it  is  helpful  also  if  the  timber  curbs  on  the 
ramp,  platform  and  cars,  be  painted  yellow  or  white,  at  least  on  the  side  of  the  driver. 
All  members  of  the  loading  gang  should  be  provided  with  carbide  lanterns  for  night  work. 

Communication 

Access  to  a  telephone  conveniently  located  is  highly  desirable,  especially  for  com- 
munication with  shippers  and  particularly  in  the  event  of  late  or  unexpected  shipments, 
or  to  advise  them  about  faulty  equipment  or  faulty  loading  and  the  like. 

Volume  Handled 

The   eastern   road   referred  to   above,  reports  2,646  vehicles  handled  at  two  of  its 

stations  in  five  months  (December  1939  to  April  1940)   or  an  average  of  264  units  per 

month  per  station,  and  a  third  station  reports  an  average  of  about  11  units  per  day  or 

about  300  per  month.  The  average  haul  is  about  200  miles  on  this  eastern  road. 

Tariff  Rates 

Tariffs  are  promulgated  to  cover  this  service  and  are  subject  to  approval  by  the 
ICC,  as  in  the  case  of  other  freight  service.  On  the  eastern  road  indicated  the  present 
schedule  is  numbered  ICC   No.   F-3631— Effective  January   17,   1939. 

Certain  special  provisions  are  incorporated  in  the  schedule  relating  to  commodities 
accepted  or  barred,  perishables,  over-weight,  etc.,  and  minimum  charges  are  named, 
this  minimum  being  the  tariff  rate  for  a  full  fiat  car  load  of  loaded  vehicles,  or  one-half 
the  full  load  rate  if  vehicles  are  empty.  The  weight  limit  is  set  at  32,500  lb.  (gross)' 
for  a  single  vehicle  moved  at  the  above  rates,  and  an  over-weight  charge  of  IS  cents 
per  cwt.,  for  all  weight  above  that  limit,  except,  if  two  trailers  are  offered  by  the  same 
shipper,  one  heavy  and  one  light,  then  the  over-weight  charge  does  not  apply  unless 
the  combined  weights  of  the  two  units  exceed  65,000  lb.  (gross)  when  the  over- weight 
charge  is  appHed  to  the  excess. 


The  scheme  was  first  developed  by  the  Chicago,  North  Shore  &  Milwaukee  Railroad 
during  or  previous  to  1934  and  it  obtained  U.  S.  letters  Patent  No.  1,611,882  on  this 
means  for  transporting  goods,  having  particular  reference  to  the  railway  car  upon  which 
highway  trucks  or  trailers  are  loaded  and  carried  and  the  means  of  attaching  the  latter 
to  the  floor  of  the  car,  also  U.  S.  letters  Patent  Nos.  1,675,512;  1,990,562;  2,001,935; 
2,023,971  and  2,023,972  in  connection  with  the  same  form  of  transportation,  and  has 
leased  the  right  to  use  it  to  various  railroads. 


This  report  is  offered  as  information. 


140  Yards   and   Terminals 


Report  on  Assignment  9 

Bibliography  on  Subjects  Pertaining  to  Yards  and  Terminals 

Appearing  in  Current  Periodicals 

E.  E.  R.  Tratman  (chairman,  subcommittee),  W.  C.  Sadler. 

General 

Agreements — Forms  for  air-right  developments,  industry  tracks,  trackage  rights  and  joint 
use  of  stations  and  freight  terminals — AREA,  Proceedings,  1940,  pp.  28,  43. 

Books — Economics  of  Transportation;  by  Prof.  Kent  Healy — Review  in  Railway  Age, 
1940,  August  17,  p.  250. 

Books — Freight  Loss  and  Damage;  pamphlet  by  Freight  Claim  Division  of  AAR — Rail- 
way Age,  1940,  August  3,  p.  187. 

Books — Illinois  Central;  Organization  and  Traffic — Prepared  by  Research  and  Develop- 
ment Bureau,  Illinois  Central,  and  dealing  with  the  traffic,  operating,  engineering,  law, 
accounting,  purchasing,  supply  and  public  relations  departments.  526  pp.,  price,  $3. 

Books — Motor  Freight  Traffic;  by  H.  C.  Williams — Freight  Traffic  Research  Institute, 
Hartford,  Conn. 

Books — Transportation;  Economic  Principles  and  Practices;  by  Emory  R.  Johnson — 
Published  bv  Appleton-Century  Co. — Review  in  Railway  Age,  1940,  August  3, 
p.  187. 

Buildings — Fire  extinguishers;  types  and  uses — AREA,  Proceedings,  1940,  p.  239. 

Buildings — Plywood  in  construction  and  repair  work  on  Southern  Pacific — Railway  Engi- 
neering and  Maintenance,  1940,  October,  p.  643. 

Buildings — Specifications  for  buildings  for  railway  purposes — AREA,  Proceedings,  1940, 
pp.  26,  184,  821. 

Buildings — Treated  wood  economical  for  sash  in  enginehouses,  etc. — Railway  Engineering 
and  Maintenance,  1940,  July,  p.  436. 

Buildings — Termites  in  railway  structures — American  Railway  Bridge  and  Building  Asso- 
ciation, Proceedings,  1940 — Railway  Engineering  and  Maintenance,  1940,  November. 

Buildings — Waterproofing  and  damp-proofing  specifications — ^AREA,  Proceedings,  1940, 
pp.  445,  853. 

Clearances — Diagrams  for  bridges,  doorways,  tunnels,  turntables,  platforms,  etc. — AREA, 
Proceedings,  1940,  pp.  28,  319. 

Clearances — Diagrams  for  third-rail  and  overhead-wire  electrical  conductors — Electrical 
Section,  Engineering  Division,  AAR,  Proceedings,  1939 — Railway  Age,  1939,  Novem- 
ber 11,  p.  745. 

Coordination  of  Transport — Railway  and  road  traffic;  paper  by  H.  C.  Murphy — Journal 
of  Western  Society  of  Engineers,  1939,  October,  p.  241. 

Coordination  of  Transport — Alabama  &  Florida;  motor  passenger  and  freight  car  runs 
on  track  and  road — Railway  Age,  1939,  November  11,  p.  757. 

Coordination  of  Transport — Baltimore  &  Ohio  (West  Virginia  Transportation  Co.)  ;  bus 
service  supplements  train  service — Railway  Age,  1939,  December  23,  p.  972. 

Coordination  of  Transport- — Canadian  National;  bus  and  train  tourist  combination  in 
British  Columbia — Railway  Age,  1940,  September  28,  p.  445. 

Coordination  of  Transport — Delaware,  Lackawanna  &  Western;  motor  trucks  replace 
local  L.c.L.  cars — Railway  Age,  1940,  September  28,  p.  446. 

Coordination  of  Transport — Development  and  possibilities  of  bus  and  truck  services — 
Railway  Age,  1940;  January  6,  p.  101;  April  13,  20  and  27,  pp.  659,  695,  733  and 
752;  May  4  and  25,  pp.  771  and  889;  June  29  and  August  10,  p.  205. 

Coordination  of  Transport — Illinois  Central;  truck  service  on  branch  lines — Railway  Age, 
1939,  September  23,  p.  447. 

Coordination  of  Transport — Kansas  City  Southern;  motor  trucks  for  local  service  reduce 
stops  of  through  trains — Railway  Age,  1939,  October  28,  p.  672. 

Coordination  of  Transport — Keeshin  motor-caravan  system  (with  containers) — Railway 
Age,  1940,  February  17,  p.  934. 

Coordination  of  Transport — Milk  service  in  Bergen  County,  New  Jersey,  by  3,000-gal. 
steel  tank  or  containers  on  trucks  and  flat  cars  for  haul  from  railroad  yard  to  city 
pasteurizing  plant — Business  Week,  1940,  January  6,  p.  34. 


Yards   and   Terminals  141 

Coordination  of  Transport — Missouri-Kansas-Texas;  truck  routes — Railway  Age,  1940, 
January  27,  p.  322. 

Coordination  of  Transport — Missouri  Pacific;  rail  and  road  services  by  bus  and  truck- 
Railway  Age,  1940;  February  24,  March  23,  June  29,  and  August  24;  pp.  378,  554, 
1121  and  287. 

Coordination  of  Transport — Motor  Terminals  Co.,  Cincinnati  and  New  York;  containers 
20  X  8  X  8  ft.  handled  on  tractor-trailers  and  on  flat  cars;  also  freight  traffic — 
Railway  Age,  1939,  December  23,  p.  973 ;  1940,  February  24,  p.  375. 

Coordination  of  Transport — Pennsylvania  Railroad;  train  and  truck  service  on  Delmarva 
Division — Railway  Age,  1940,  July  27,  p.  153. 

Coordination  of  Transport — Reading  Company;  bus  routes  and  services — Railway  Age, 
1940,  September  28,  p.  447. 

Coordination  of  Transport^ — St.  Louis-San  Francisco;  subsidiary  tractor-trailer  services — 
Railway  Age,  1939,  November  25,  p.  826. 

Stopping  Trains — Portable  wayside  device  to  check  speed  of  trains — ^Railway  Age,  1940, 
June  22,  p.  1102. 

Stopping  Trains— Cost  involved — Signal  Section,  AAR,  1940,  Proceedings,  Volume  37, 
No.  1,  p.  6 — Railway  Mechanical  Engineer,  1939,  August  and  September. 

Stopping  Trains — Cost  and  loss  of  time  by  "slow  orders" — Roadmasters  and  Maintenance 
of  Way  Association,  Proceedings,  1940 — Railway  Engineering  and  Maintenance,  1940, 
October,  p.  652. 

Track — Movable-point  crossings  for  long  small-angle  crossings;  Missouri-Kansas-Texas 
— Railway  Engineering  and  Maintenance,  1940,  April,  p.  253. 

Track — Spring  switches;  maintenance  instructions — Signal  Section,  AAR,  1940,  Proceed- 
ings, Volume  37,  No.  1,  p.  231. 

Track — Switch  design,  and  repair  by  welding — AREA,  1940,  Proceedings,  pp.  565  and  573. 

Track — Turnouts  for  high  speed;  Chicago  &  Northwestern — Railway  Engineering  and 
Maintenance,  1940,  August,  pp.  498  and  506. 

Passenger  Stations  and  Terminals 

Aguascalientes — Mexican  National  Railway ;  passenger  station  and  office  building  (pictures 
only) — Railway  Age,  1940,  January  6,  p.  43. 

Amsterdam— Netherlands  State  Railways;  demolition  of  trainshed  of  old  Weesperpoort 
station  by  four  cables  attached  to  a  locomotive;  new  Amstel  station,  with  re- 
arrangement of  terminal  and  approaches— Railway  Gazette  (London),  1940,  March 
29,  April  5,  May  17,  pp.  460,  490  and  707. 

Ankara — Turkish  State  Railway;  photographs  of  new  station  and  office  building  of 
administration — Railway  Gazette   (London),  1940,  January  26,  p.  124. 

Belgium — Belgian  National  Railways;  standard  designs  for  platform  shelters  at  small 
stations,  to  accommodate  30  to  100  passengers;  built  of  precast  concrete  units — 
Railway  Gazette  (London),  1940,  April  19,  p.  568. 

Berlin — Completion  of  north-south  underground  line  across  city  to  connect  terminal  sta- 
tions; supplements  an  east-west  line  and  a  circle  line — Railway  Gazette  (London), 
1940,  September  20,  p.  300. 

Brighton — Station  as  built  in  1841  and  modified  in  1939  by  Southern  Railway,  England 
— Railway  Gazette  (London),  1940,  May  17,  p.  709. 

Brussels — New  stations  on  new  crosstown  line  connecting  old  terminal  stations — Engi- 
neering (London),  1940,  July  5,  12,  26,  pp.  13,  21,  74. 

Chicago — Renewing  longitudinal  timbers  carrying  rails  in  upner  floor  of  terminal  station 
of  Chicago  &  Northwestern — Railway  Engineering  and  Maintenance,  1939,  Septem- 
ber, p.  526. 

Delhi — Revision  of  terminals  to  serve  the  adjacent  cities  of  Delhi  (old  city)  and  New 
Delhi  (capital  city  of  India) — Railway  Gazette  (London),  1940,  April  19.  p.  567. 

Durban — New  terminal  station  for  South  African  Government  Railways;  seven  platforms, 
14  tracks  500  to  1200  ft.;  three-story  head-house;  cost  .<p2,l  10,000— Railway  Gazette 
(London),  1940,  January  5,  p.  7. 

East  St.  Louis — Terminal  Railroad  Association  of  St.  Louis;  new  union  station  project 
in  connection  with  revision  of  lines  for  crossing  the  river  into  St.  Louis — Railway 
Age,  1939,  December  16,  p.  925. 

Elizabeth — Central  Railroad  of  New  Jersey;  grade  separation  on  main  and  branch  lines, 
with  new  station  at  intersection  of  lines — Railway  Age,  1939,  November  18,  p.  784. 


142 Yards   and   Terminals 

England — Arrangements  for  traffic  at  stations  during  war  "black-outs" — Railway  Gazette 

(London),  1939,  December  1,  p.  715. 
Harrisburg — Pennsylvania  Railroad;   raising  enclosed  passenger  bridge  across  tracks  in 

trainshed;    necessitated   by   electrification   requiring   more   headroom — Railway   Age, 

1939,  October  21,  p.  615. 
High  Point — Southern,  in  North  Carolina;  tracks  depressed  through  city  for  two  miles; 

alterations  to  passenger  stations  and  freight  facilities — Railway  Age,  1939,  December 

9,  p.  882. 
Jersey  City — Erie;  modernizing  waiting  rooms  and  other  public  facilities — Railway  Age, 

1939,  November  11,  p.  751. 
La  Crosse — Chicago,  Burhngton  &  Quincy;  new  station — Architectural  Forum,  1940,  May, 

p.  323 — American  Builder,  1940,  September,  p.  74. 
Leamington — Great  Western  Railway  (England)  ;  reconstruction  of  junction  station,  with 

new  buildings — Railway  Gazette  (London),  1940,  May  10,  p.  675. 
London — London  Passenger  Transport  Board;  new  stations  on  the  underground  railways 

— Railway  Gazette  (London),  1939,  November  24,  p.  668. 
Los  Angeles — New  union  station;  papers  by  M.  C.  Blanchard,  A.,  T.  &  S.  F.,  and  G.  E. 

Donnakin,  Union  Station  Co. — -Pacific  Railway  Club,  Proceedings,  1940,  July. 
Manchukuo — Views  of  large  and  small  stations  of  Manchukuo  Government  Railways- 
Railway  Gazette  (London),  1939,  December  IS,  p.  781. 
Massachusetts — New  York,  New  Haven  &  Hartford  ordered  by  State  Department  of 

Public  Utilities  to  reopen  and  restore  train  service  at   72  stations  which  had  been 

closed — Railway  Age,  1939,  December  9,  p.  903. 
Minneapolis — Chicago,  Milwaukee,  St.  Paul  &  Pacific;  improvement  and  modernizing  of 

terminal    station — Business    Week,    1939.    December    23,    p.    24 — American    Railway 

Bridge  and  Building  Association,  Proceedings,  1940. 
Montreal — Canadian  National ;  plan  of  new  terminal  and  connections ;  for  completion  in 

1941— Railway  Gazette  (London),  1940,  May  3,  p.  632;  August  2,  p.  115. 
Newcastle — London    &    Northeastern    Railway,    England ;    track    plan    and    signaling    of 

Central  Station;  ten  platform  tracks — Railway  Gazette  (London).  1939,  October  13, 

p.  110  of  supplement. 
New  York — New  York,  Susquehanna  &  Western ;  motor  rail  cars  for  suburban  commuter 

service — Railway  Age,  1940,  July  27,  p.  135. 
New  York — Pennsylvania  Railroad;  shuttle  train  service  between  Pennsylvania  Station 

and  World's  Fair  on  Long  Island — Railway  Age,  1939,  November  18,  p.  801. 
Oslo — Norwegian  State  Railway ;  proposed  connection  between  two  terminal  stations  to 

permit  through  traffic;  West  Station  to  have  six  new  tracks  (20  in  all)  with  double- 
track  approach  to  tunnel  between  stations;  the  alternative  is  a  by-pass  line — Railway 

Gazette  (London),  1940,  March  6,  p.  334. 
Philadelphia — Reading  Company;  welding  repair  work  on  arched  trainshed  built  in  1892; 

260  ft.  span,  13  tracks — Railway  Engineering  and  Maintenance,  1940,  June,  p.  378. 
Poland — Photographs  of  large  stations — Railway  Gazette  (London),  1939,  December  22, 

p.  814. 
Rome — Italian  State  Railway;  Rome-Ostiense  station,  built  1938  for  reception  of  Hitler; 

building  500  x  60  ft.,  with  private  gallery  for  visitors  passing  between  trains  and 

automobiles — Railway  Gazette  (London),  1940,  July  5,  pp.  12  and  18. 
Rome — Italian  State  Railway;  old  "Termini"  station  to  be  rebuilt  to  permit  construction 

of  a  new  station  on  an  extension  of  the  underground  railway  to  the  1942  Exhibition 

—Railway  Gazette  (London),  1940,  April  19,  p.  569. 
St.  Louis — Terminal  Railroad  Association  using  Municipal  Bridge  as  new  route  across 

the  river  into  the  Union  Station— Railway  Age,  1939',  December  16,  p.  923;   1940, 

February  17,  p.  325. 
St.  Louis — Terminal  Railroad  Association;  destruction  of  signal  tower  by  fire  at  Union 

Station,  and  emergency  handling  of  traffic — Railway  Age,  1940,  August  3,  p.  171. 
South  Africa — South  African  Government  Railways;  stations  at  Jeppe  and  Mayfair  (near 

Johannesburg),  and  grade  separation  at  Jeppe;  street  at  higher  level,  with  entrance 

to  second  floor  of  station — Railway  Gazette  (London),  1939,  November  17,  p.  644. 
Sydney — New  South  Wales  Government  Railways;  improved  handling  of  baggage,  mail 

and  parcels;   baggage  hauled  by   7-HP.  motor  trucks,  each  with  four  trailers   (3^ 

tons)   at  4  miles  per  hour;  all  with  pneumatic  tires — Annual  report  of  Department 

of  Railways,  1938-39,  p.  10. 


Yards   and    Terminals  143 

Utrecht — Netherlands  State  Railways;  new  Central  Station,  with  architectural  features — 
Railway  Gazette  (London),  1939,  December  1,  pp.  694  and  709. 

Air  Conditioning — Application  to  parked  cars — AREA,  Proceedings,  1940,  p.  35. 

Bus  Terminal — Dunedin,  New  Zealand,  for  New  Zealand  Government  Railways;  earth- 
quake resistant  design;  welded  steel  roof  trusses  of  110  ft.  span;  concourse,  30  x  65 
ft. — Railway  Gazette   (London),  1940,  February  9,  p.  180. 

Bus  Terminal — New  York;  for  bus  service  in  connection  with  North  Beach  airport — 
Engineering  News-Record,  1940,  July  18,  p.  94. 

Bus  Terminal — Washington,  D.C.;  Greyhound  Bus  Co.  terminal — Bus  Transportation, 
1940,  April,  p.  166. 

Bus  Terminal — Windsor,  Ontario;  for  interurban  bus  and  airplane  services — Canadian 
Transportation,  1940,  September,  p.  475. 

Car  Washing — Washing  machines  for  cars,  street  cars  and  buses — Railway  Age,  1939, 
December  23,  p.  975. 

Coach  Yards— California  Avenue  yard,  Chicago  &  Northwestern;  hand  carts  with  trash 
containers  hauled  in  trains  to  an  incinerator  by  tractors — Railway  Engineering 
and  Maintenance,  1940,  October,  p.  402. 

Coach  Yards — Yards  with  storage  sheds  and  repair  shops  at  Swindon  and  Caerphilly; 
Great  Western  Railway  (England);  shed  1800  x  125  ft.;  ten  tracks;  capacity,  265 
cars;  steel  truss  roof  of  single  span;  traveling  cranes  lift  bodies  off  wheels — Railway 
Gazette  (London),  1939,  December  8,  p.  567;  1940,  March  IS,  p.  57. 

Coach  Yards — Operating  methods;  repair-track  service;  labor  and  costs — Car  Depart- 
ment Officers'  Association  of  Chicago ;  Proceedings,  1939 — Railway  Age,  1939, 
November  18,  p.  792. 

Coach  Yards — Car  truck  and  wheel  handhng  methods — AREA,  Proceedings,  1940,  p.  244. 

Conveyor — Belt  conveyor  200  ft.  long  handles  mail  and  baggage  between  train  and  car- 
ferry  steamer  at  Larne,  Ireland;  London,  Midland  &  Scottish  Railway;  end  section 
adjustable  to  suit  height  of  tide  and  to  serve  various  loading  points  on  the  ship — 
The  Engineer  (London),  1939,  November  24,  p.  524. 

Escalators — Moving  stairways;  definition — AREA,  Proceedings,  1940,  pp.  243  and  815. 

Floors — Floor  construction  of  various  materials  for  railway  stations;  Missouri-Kansas- 
Texas — Railway  Engineering  and  Maintenance,  1940,  August,  pp.  511  and  521. 

Hotels- — Canadian  National;  Vancouver  Hotel — Architectural  Record,  1940,  July — Rail- 
way Age,  1940,  July  27,  p.  150. 

Hotels — Norfolk  &  Western ;  reconstruction  and  rehabilitation  of  Roanoke  Hotel — Rail- 
way Age,  1939,  November  25,  p.  820. 

Platforms — Comparison  of  different  materials^ — -American  Railway  Bridge  and  Building 
Association,  Proceedings,  1939,  p.  189. 

Snow — Snow  and  ice  clearing  methods  at  stations  and  yards — Roadmasters  and  Main- 
tenance of  Way  Association,  Proceedings,  1940 — Railway  Engineering  and  Mainte- 
nance, 1940,  October,  pp.  663  and  667. 

Snow — Switches  and  frogs  cleared  by  electric  heaters  on  London,  Midland  &  Scottish 
Railway — Railway  Gazette   (London),  1940,  May  24,  p.  735. 

Stations — Modernizing  old  stations  for  appearance,  comfort  and  convenience — American 
Railway  Bridge  and  Building  Association;  Proceedings,  1939,  p.  181;  also  1940 — 
Railway  Engineering  and  Maintenance,  1940,  November,  p.  744. 

Stations — Modernizing   old   stations;    Union   Pacific — Railway   Engineering   and   Mainte- 
nance, 1939,  October,  p.  584;  1940,  January  and  February,  pp.  38  and  91. 
Stations — Signaling    on    approaches    to    large    stations — The    Engineer    (London),    1939. 

December  8  and  15;  pp.  565  and  582. 
Stations — Train-taxi  service  offered  by  railways  in  25  cities — Business  Week,  1940,  June 

8,  p.  24. 
Stations — Water   supply   systems   for   drinking   service   at   stations — AREA,   Proceedings, 

1940,  p.  206. 
Traffic — Handling  military  and  troop  train  traffic  on  Chicago  &  Northwestern  and  Chi- 
cago, Milwaukee,  St.  Paul  &  Pacific — Railway  Age,  1940,  August  17,  p.  243. 
Traffic — Handling  poHtical  trains  for  Willkie  meeting  at  Elwood,  Ind.,  and  Government- 
Day  trains  at  Seagirt,  N.J. — Railway  Age,  1940,  August  24  and  31,  pp.  279  and  316. 


144 Yards   and   Terminals 

Freight  Stations,  Terminals  and  Yards 

Car  Dumper — Pennsylvania  Railroad;  coal-shipping  dock  at  Sandusky;   barney  pusher 

on  incline  to  electrically  operated  elevating  cradle;  car  per  minute;  dumper  supple- 
ments two   steam-operated   dumpers;   extensive  yard   system — Railway   Age,    1940, 

April  6,  p.  625. 
Car  Retarders — Definition  of  term — ^AREA,  Proceedings,  1940,  p.  243. 
Car  Retarders — (1)    Economic  value,  (2)   specifications,   (3)   maintenance  instructions — • 

Signal  Section,  AAR;  Proceedings,  1940,  Volume  37,  No.  1,  pp.  41,  93  and  219. 
Car  Retarders — Frolich  hydraulic  system  at  Hamm;  also  electric  system;  German  State 

Railway    Co.— AREA,   Proceedings,    1940,  p.   815— The   Engineer    (London),    1940, 

July  12,  p.  27.  October  11,  p.  226. 
Car  Retarders — Switching  operations  speeded  by  their  use — Railway  Age,  1940,  May  25, 

p.  908. 
Classification   Yards — French   National   Railways;    automatic  control   of   cars  in   hump 

yard  by  use  of  electrically  operated  skids  acting  in  accordance  with  speed  of  cars — 

Railway  Gazette  (London),  1939,  December  IS,  p.  765 — Revue  Generale  des  Chemins 

de  Fer,  1939,  June. 
Classification  Yards — German  State  Railway  Co.;  hump  yard  at  Hamm,  with  Frohch 

hydraulic  car  retarder — The  Engineer  (London),  1940,  July  12,  p.  27. 
Classification  Yards — Great  Western  Railway,  England;  handling  yard  and  freighthouse 

services  during  black-out  periods — Railway  Gazette  (London),  1939,  November  17, 

p.  649. 
Classification   Yards — London,   Midland  &   Scottish   Railway;    mechanization   of  Toton 

Down  yard;  car  retarders  and  power-operated  switches — Pamphlet,  Railway  Gazette 

(London),  1939. 
Classification  Yards — South  African  Government  Railways;  new  yards  at  Johannesburg, 

Capital    Park   and    Pretoria — Report    of    General    Manager,    1939,    p.    46 — Railway 

Gazette  (London),  1939,  November  24,  p.  666. 
Coal  Tipple — Coal  breaker  and  tipple;   Anthracite  Coal  Co.,  Pittston,   Pa. — Coal  Age, 

1940,  January,  p.  54. 
Coal  Tipple — Coal  breaker  and  tipple;  Shenandoah,  Pa. — Coal  Age,  1940,  August,  p.  44. 
Coal  Tipple — Coal  tipple  and  washer;  Shawmut  Mining  Co.— Coal  Age,  1939,  October, 

p.  56. 
Containers — Keeshin  motor-carrier  system — Railway  Age,  1940,  February  17,  p.  934. 
Containers — Proposed  handling  of  coal  in  l.c.l.  lots — Circular  No.  39,  University  of  IIU- 

nois  (Engineering  Experiment  Station),  1939. 
Containers — Refrigerating  containers  handled  in  box  cars;  Missouri  Pacific — Railway  Age, 

1940,  May  11,  p.  816. 
Containers — Refrigerating   containers  for   meat   traffic   on   English   railways,   with   coor- 
dinated service  over  all  lines — Railway  Age,  1939,  December  23,  p.  975. 
Containers — Refrigerating  insulated  containers  convey  chilled  meat  at  Durban  harbor — 

South  African   Government  Railways  and  Harbors;   Report   of   General  Manager, 

1939,  p.  86. 
Conveyors — Belt   conveyor  loading   ore   to   ships  at  Michipicoten ;    Algoma   Central   & 

Hudson  Bay — Canadian  Transportation,  1940,  March,  p.  109. 
Door-to-Door  Service — Form  of  agreement — AREA,  Proceedings,  1940,  p.  28. 
Door-to-Door  Service — Review  of  merchandise  handUng  and  pick-up  and  delivery  service 

— Railway  Age,  1940,  May  25,  p.  898. 
Express — Equipment   and    service    of    Railway    Express   Agency    and    Canadian    Pacific 

Express  Agency — Railway  Age,  1940,  January  27,  p.  215. 
Freight  House — Review  of  services  and  faciUties — Railway  Age,  1940,  May  25  and  June 

15,  pp.  887,  900  and  1050. 
Freight  House — Great  Western  Railway    (England) ;   handling  freight  house  and  yard 

work  during  war  "black-out"  periods — Railway  Gazette  (London),  1939,  November 

17,  p.  649. 
L.C.L.  Service — Freight  house  operation — American  Association  of  Railroad  Superintend- 
ents, Proceedings,  1939  and  1940 — Railway  Age,  1939,  November  18,  p.  789;  1940, 

June  15,  p.  1050. 
Produce  Terminals — Chicago,  111.;  transportation  and  marketing  facilities  for  fruit  and 

vegetables — Business  Week,  1939,  July,  p.  280. 


Yards   and   Terminals 145 

Produce  Terminals — Rival  projects  for  groups  of  railways  at  Denver,  Colo.;  Kansas  City, 
Kan.,  and  Kansas  City,  Mo. — Business  Week,  1939,  December  16,  p.  20;  1940, 
January  6,  p.  8. 

Produce  Terminals — Denver,  Colo.;  rival  projects  of  the  Union  Pacific  and  a  group  of 
five  railroads  (Santa  Fe,  Burlington,  Rock  Island,  Colorado  &  Southern  and  Denver 
&  Rio  Grande  Western) — Railway  Age,  1940,  January  20,  March  2  and  30,  pp.  177, 
407  and  584 — Wood  Preserving  News,  1939,  December,  p.  147. 

Produce  Terminals — Kansas  City,  Kan.,  and  Kansas  City,  Mo.;  municipal  plant  leased 
to  Union  Pacific;  Missouri  Pacific  interested  in  other  plants — Engineering  News- 
Record,  1940,  January  11,  p.  58 — ^Wood  Preserving  News,  1940,  January,  p.  5— 
Business  Week,  1940,  January  6,  p.  8;  September  21,  p.  18 — Railway  Age,  1940, 
March  23,  p.  589.    • 

Produce  Terminals — Farm  products  handled  by  motor  trucks;  cost  and  service — .'\gricul- 
tural  Experiment  Station,  Purdue  University,  Bulletin  446 — Railway  Age,  1940, 
October  12,  p.  515. 

Refrigeration — Pre-cooling  fruit  by  the  tunnel  system  at  Table  Bay  harbor — South 
African  Government  Railways  and  Harbors;  report  of  the  General  Manager,  1939, 
pp.  59  and  62. 

Refrigeration — Dry  ice  for  perishable  shipments  in  refrigerator  cars — Railway  Age,  1940, 
August  3,  p.  175. 

Refrigeration — Refrigerator  car  of  light  weight — Railway  Age,  1940,  August  24,  p.  275. 

Scales — Inspection  and  testing  system  for  track  scales;  Southern  Pacific — Railway  Engi- 
neering and  Maintenance,  1940,  April,  p.  256. 

Scales — Specifications  for  track  scales  and  motor-truck  scales — AREA,  Proceedings,  1940, 
pp.  27  and  247. 

Snow — Handling  snow  and  ice  at  terminals — Roadmasters  and  Maintenance  of  Way 
Association  of  America,  Proceedings,  1940 — Railway  Engineering  and  Maintenance, 
1940,  October,  p.  651. 

Stockyards — Miscellaneous  structures  at  terminals — ^American  Railway  Bridge  &  Building 
Association,  Proceedings,  1939,  p.  190. 

Stockyards — Enquiry  as  to  service  requirements  at  Cleveland  stockyards — Railway  Age, 

1939,  December  30,  p.  1010. 

Switching  Locomotives — Oil-electric  and  steam  locomotives  compared  for  yard  service — 
American  Association  of  Railroad  Superintendents,  Proceedings,  1940 — Railway  Age, 

1940,  February  3,  p.  249. 

Switching  Locomotives — Oil-electric  engines;  120-ton  1000  HP.  and  100-ton  660  HP. — 
Railway  Age,  1939,  December  30,  p.  992. 

Switching  Locomotives — Number  and  maintenance  work  of  oil-electric  engines — Railway 
Age,  1940,  July  6,  p.  34. 

Switching  Locomotives — Oil-engine  machines  replace  steam  locomotives — Railway  Age, 
1939,  September  23,  p.  436. 

Switching  Locomotives — Oil-electric  machines  in  Mexico — Railway  Age,  1940,  January 
20,  p.  169. 

Switching  Locomotives — Oil-electric  machines  in  the  Soudan — Railway  Gazette  (Lon- 
don), 1940,  May  10,  p.  60  (supplement). 

Switching  Locomotives — Rock  Island  Lines,  44-ton,  360  HP. — Railway  Age,  1939,  Decem- 
ber 9,  p.  879. 

Switching  Locomotives — Spokane,  Portland  &  Seattle  and  other  lines;  600  and  1000  HP. 
—Railway  Mechanical  Engineer,  1940,  October,  p.  379— Railway  Age,  1940,  October 
12,  p.  505. 

Switching  Locomotives — Oil-hydraulic  engine — Railway  Age,  1939,  October  21,  p.  625. 

Telephone — Train-telephone  between  cab  and  caboose;  Bessemer  &  Lake  Erie — Railway 
Age,  1940,  July  20,  p.  114. 

Teletype — Communication  between  yard  and  office;  Erie  Railroad — Canadian  Transpor- 
tation, 1940,  August,  p.  393. 

Terminals — Terminal  capacity  and  line  capacity  in  relation  to  freight  conveying  capacity ; 
paper  by  F.  G.  Gurley — Railway  Age,  1940,  January  27.  p.  211. 

Terminals— Terminal  switching  charges  disputed;  Sioux  City  (Iowa)  Terminal  Railway 
Co.— Railway  Age,  1940,  July  27,  p.  156. 

Terminals— Terminal  delays  reduced  on  St.  Louis-San  Francisco— Railway  Age,  1940, 
June  8,  p.  1008. 


146  Yards    and    Terminals 

Terminals— Terminal   and   division   point   delays   reduced   by   car   inspection — American 

Association    of    Railroad    Superintendents,    Proceedings,    1940 — Railway    Mechanical 

Engineer,  1940,  August,  p.  315. 
Terminals — Terminal  delays  reduced  in  yard  switching  and  transfer  operations — Railway 

Age,  1940,  May  27,  p.  904. 
Terminals — Terminal   service   at   Philadelphia   and    Baltimore ;    Pennsylvania    Railroad — 

Railway  Age,  1940,  July  27,  p.  153. 
Track — Heavy  and  well-maintained  track  aids  efficiency  of  yard  work — Railway   Engi- 
neering and  Maintenance,  1940,  October,  p.  636 — Railway  Age,  1940,  May  25,  p.  909. 
Traffic — Export  traffic   through  Atlantic   and   Gulf   port   terminals — Railway   Age,   1940, 

January  27  and  February  3,  pp.  229  and  259. 
Traffic — Fast  merchandise   service   with   special   box   cars,   Union   Pacific — Railway   Age, 

1939,  December  16,  p.  929. 
Traffic — Fast  schedules  and  special  "overnight"  trains — Railway  Age,   1940,  January   6, 

p.  20. 
Traffic — Faster    average    freight    train    speeds    between    terminals — Railway    Mechanical 

Engineer,  1940,  June,  p.  226. 
Traffic — Freight  transportation  service  developments — Railway  Age,   1940,   May   25   and 

September  28. 
Truck  Transport — Truck  competition  and  Interstate  Commerce  Commission  regulation — 

Railway  Age,  1940,  August  10  and  September  7,  pp.  205,  337  and  341. 
Turntables — Industrial  plants  in  France  have  turntables  with  extensions  to  carry  small 

cars  up  to  20  ft.  wheelbase — International  Railway   Congress  Association,   Bulletin, 

1939,  October,  p.  1021. 

Yards — City  freight  yards  versus  outlying  yards — AREA,  Proceedings,  1940,  p.  249. 
Yards — Delhi,  India;  revision  of  yards  and  terminals  due  to  changes  in  passenger  stations 

and  approaches — Railway  Gazette  (London),  1940,  April  19,  p.  567. 
Yards — New  York  Central;  reconstruction  of  West-Side  yards  at  30th  St.,  New  York — 

Engineering  News-Record,   1940,   September   19,   p.   379' — Railway   Age,   1940,  April 

13  and  20. 
Yards — Zone  yard,  or  auxihary  yard— AREA,  Proceedings,  1940,  p.  243. 

Locomotive  Terminals  and  Railroad  Shops 

Book — The  Locomotive  Running  Department,  by  J.  G.  B.  Sams,  locomotive  superin- 
tendent, Kenya  &  Uganda  Government  Railway — Published  by  Locomotive  Publish- 
ing Co.,  London,  England.  Terminal  layouts,  ashpits,  turntables,  boiler  water  treat- 
ment, etc. 

Chesapeake  &  Ohio — -Timber  truss  roof  construction  for  enginehouses — Railway  Engi- 
neering and  Maintenance,  1939,  October,  p.  586. 

Chicago  &  Eastern  Illinois — Coach  shop  and  methods  of  handling  stores  at  Danville,  111.- — 
Railway  Age,  1940,  January  13  and  June  22,  pp.  122  and  1099. 

Chicago  &   Illinois  Midland — Stores  and  store  house  at   Springfield,   111. — Railway  Age, 

1940,  July  6,  p.  76. 

Ilhnois   Central — Car   shops   and   labor   saving   equipment   at   Centralia   and   Paducah — 

Railway  Mechanical  Engineer,  1940,  January,  June  and  August,  pp.  28,  228  and  324. 
Great  Western  Railway  (England) — Passenger  car  repair  and  paintmg  shops  and  storage 

shed  for  300  cars;   overhead  cranes  hft   car  bodies  from   trucks — Railway   Gazette 

(London),  1940,  June  21,  p.  861 — The  Engineer   (London),  1940,  April  12,  p.  350. 
London  Passenger  Transport  Board — Trolley-bus  storage  and  cleaning  depot — Railway 

Gazette  (London),  1940,  August  16,  p.  173. 
Missouri-Kansas-Texas — Purchasing  and  stores  practice — Railway  Age,   1939,   December 

2,  p.  849. 
New  York  Central — Handling  supplies  at  Beech  Grove  shops,  Indianapolis — Railway  Age, 

1939,  November  4,  p.  710. 
Pennsylvania  Railroad — Enginehouse  with  glass  block  windows  at  Oil  City,  Pa.— Railwav 

Age,  1940,  October  12. 
Rock  Island  Lines — New  stock-keeping  methods  at  shops — Railway  Age,  1939,  December 

16,  p.  926. 
Fuel  Stations — Fuel  supply  at  terminals  for  oil-electric  locomotives — Railway  Age,  1940, 

May  4,  p.  782 — Railway  Gazette  (London),  1939,  November  24,  p.  184  (supplement). 


Yards   and   Terminals  147 


Scrap — Methods  of  handling  railroad  supplies  and  scrap — Pacific  Railway  Club,  Proceed- 
ings, 1940 — Purchases  and  Stores  Division,  AAR;  Proceedings,  1940 — Railway  Age, 
1940,  June  29,  pp.  1156  and  1160;  October  12,  p.  508. 
Shops — Bus  repair  shop  and  garage  at  Hamilton,  Ont. — Canadian  Transportation,  1940, 
June,  p.  300. 

Shops — Railway  shops  and  motive-power  equipment  in  relation  to  preparedness  problem 
— Railway  Age,  1940,  June  22. 

Shops — Roof  glazing  for  shops  and  enginehouses — American  Railway  Bridge  and  Building 
Association;  Proceedings,  1939,  pp.  88,  113  and  184. 

Shops — Heating  methods,  by  piping  and  heater  units  for  shops  and  enginehouses— 
American  Railway  Bridge  and  Building  Association,  Proceedings,  1940 — Railway 
Engineering  and  Maintenance,  1940,  p.  748. 

Shops — Wheel  drop-pit  table  of  60  tons  capacity;  Green  Bay  &  Western — Railway 
Mechanical  Engineer,  1940,  January,  p.  27. 

Shops — Wheel  and  truck  handling  by  drop-pits  with  jacks  and  tables — AREA,  Proceed- 
ings, 1940,  pp.  212,  244,  246,  816  and  826. 

Water  Stations — Water  cars  on  trains  as  auxiliary  tenders  to  avoid  stops — Railway  Age, 
1940,  May  4,  p.  781. 

Water  Stations — Changes  necessitated  by  large  tenders  and  long  runs — American  Railway 
Bridge  and  Building  Association,  Proceedings,  1940 — Railway  Engineering  and  Main- 
tenance, 1940,  November. 

Water  Stations — Deep  wells;  methods  of  improving  supply — AREA,  Proceedings,  1940, 
p.  225. 

Water  Stations — Emergency  service  during  drought — Railway  Age,  1940,  January  20, 
p.  160. 

Water  Stations — Emergency  service  for  army  maneuvers  when  wells  failed;  Illinois 
Central — Railway  Engineering  and  Maintenance,  1940,  October,  p.  641. 

Water  Stations — Pipe;  iron,  steel,  copper,  asbestos,  etc.;  also  prevention  of  incrustation — 
AREA,  Proceedings,  1940,  pp.  224,  240,  836. 

Water  Stations — Pumping  equipment ;  steam  and  electric — Roadmasters  and  Maintenance 
of  Way  Association  of  America,  Proceedings,  1939 — Railway  Age,  1939,  October  28, 
p.  658 — Railway  Engineering  and  Maintenance,  1939,  November  and  December,  pp. 
690,  754,  769;  1940,  January,  February  and  May,  pp.  30,  36,  97,  329,  and  330— 
Railway  Engineering  and  Maintenance,  1940,  June,  pp.  373  and  387. 

Water  Stations — Pumping  plant  and  track  tanks — American  Railway  Bridge  and  Build- 
ing Association,  Proceedings,   1939. 

Water  Stations — Reconstruction  program — Railway  Engineering  and  Maintenance,  1940, 
June,  pp.  373  and  387. 

Water  Stations — Specifications  for  tanks  and  for  water  treatment — AREA,  Proceedings, 
1940,  pp.  24  and  27. 

Water  Stations— Tenders  carrying  23,500  gal.  of  water  and  25  tons  of  coal;  Union  Pacific 
— Railway  Mechanical  Engineer,  1940,  October,  p.  386. 

Water  Stations — Watering  facilities  adjusted  for  larger  tenders,  high  speeds  and  long  runs 
— American  Railway  Bridge  and  Building  Association,  Proceedings,  1940 — Railway 
Engineering  and  Maintenance,  1940,  November,  p.  758. 

Water  Stations — Water  cars  on  trains  as  auxiliary  tenders — Railway  Age,  1940,  May  4, 
p.  781. 

Water  Stations — Water  column  inspections — Railway  Engineering  and  Maintenance,  1939, 
September,  p.  536. 

Water  Stations — Water  treatment  practice  on  the  IHinois  Central  and  the  Union  Pacific 
(Council  Bluffs  plant)— Railway  Age,  1939,  December  30,  p.  1002;  1940,  September 
7,  p.  331. 

Rail  and  Water  Terminals 

Car  Ferries — Description  of  numerous  American  and  foreign  lines;  paper  by  E.  E.  R. 
Tratman— AREA,  Proceedings,  1940,  p.  965. 

Car  Ferries — Danish  State  Railways;  views  of  side-wheel  car-ferry  steamers  of  Denmark- 
Sweden  line  in  harbor  of  Elsinore— National  Geographic  Magazine,  1940,  January, 
p.  10. 

Car  Ferries — Danube  River;  Rustchuk-Giurgiu  line  to  connect  Bulgarian  and  Rou- 
manian railways;  boat  built  in  Germany,  1939,  for  Bulgarian  State  Railways- 
Railway  Gazette  (London),  1939,  October  13,  p.  483. 


148 Yards   and   Terminals 

Car  Ferries — Lake  Michigan ;  Pere  Marquette  builds  largest  car-ferry  on  the  Great  Lakes ; 

sells  an  older  boat  "P.  M.  No.  19",  in  service  1908-1936 — Canadian  Transportation, 

1940,  July  and  August,  pp.  388  and  439. 
Car  Ferries — New  York  Harbor;  welded  steel  car-floats  or  barges  350  x  40  ft.  for  Long 

Island  Railroad — Marine  Engineering,  1940,  June,  p.  62. 
Car  Ferries — Ontario  Car  Ferry  Co.;  new  tariffs — Canadian  Transportation,  1940,  June, 

p.  335. 
Car  Ferries — Transfer  bridges  of  pontoon  and  other  types — ^AREA,  Proceedings,  1940, 

p.  177. 
Conveyors — Barge   loading;    dock   to   storage  plant   for   coal   at   Marmet,   W.  Va.,   on 

Kanawha  River — Coal  Age,  1939,  September,  p.  36. 
Conveyors — Cableway  or  wire-rope  tramway  carrying  ore  to  ships  2,000  ft.  from  shore 

at  Cyprus,  Greece;  200  tons  per  hour — The  Engineer  (London),  1939,  December  8, 

p.  572. 
Conveyors — Coal-loading  dock  on  Ohio  River  at  Huntington,  W.  Va. — Coal  Age,  1940, 

May,  p.  37. 
Ferry — Baltimore-Love   Point;    Pennsylvania    Railroad    (Delmarva    Division) — Railway 

Age,  1940,  July  27,  p.  1S3. 
Ferry — Lame,    Ireland;    automatically   adjusting   landing   apron   for   automobile   ferry; 

London,  Midland  &  Scottish  Railway — The  Engineer  (London),  1939,  November  24, 

p.  524. 
Ferry — Oil-engine   boat   for   automobiles   and   passengers   at   Plaquemines,   La. — Marine 

Engineering,  1940,  September,  p.  73. 
Ferry — Oil-electric  ferryboat  "Diefenback"  at  New  York;  one  of  nine  similar  boats  on 

the  Hudson  River — Marine  Engineering,  1940,  April,  p.  54. 
Grain  Traffic — Record  on  the  Great  Lakes  for   1939 — Canadian  Transportation,   1940, 

June,  p.  332. 
Marine   Railway — Cable-operated  incUne   at   La   Guardia   airport.   New   York — Marine 

Engineering,  1940,  March,  p.  85. 
Piers — Types  of  pier  construction — ^AREA,  Proceedings,  1940,  p.  180. 
Port  Terminals— New  Westminster,  B.C.;  port  activity  and  terminal  extensions — Cana- 
dian Transportation,  1940,  January,  p.  45. 
Port  Terminals — New  York;  organization,  belt  railroad,  Bayonne  terminal  for  ship-rail 

transfer — Civil  Engineering,  1940,  March,  May  and  July,  pp.  157,  281  and  425. 
Port  Terminals — Terminals  and  export  traffic — Railway  Age,  1940,  June  22,  p.  1103. 
Port  Terminals — Uniform  charges  and  operating  practices  needed  for  municipal,  private 

and  railroad  docks — "Port  Book",  Houston  (Tex.)  Port  Commission;  1939,  Novem- 
ber, p.  9;  1940,  May,  p.  9. 
Steamer — Self-unloading  coal  steamer  "Jason"  for  Atlantic  coast  service — Marine  Engi- 
neering, 1940,  May,  p.  62. 
Towboat — Oil-engine  twin-screw  boat  "Wm.  Penn"  for  Ohio  and  Mississippi  River  service 

— Marine  Engineering,  1940,  September,  p.  68. 
Wharf — Long    Beach,    California;    concrete   piles   deteriorated   and   replaced    with   steel 

H-beam  piles  and  steel  tube  piles — Engineering  News-Record,   1939,   December   7, 

p.  750. 


Progress  report — Submitted  as  information. 


Report  of  Committee  9 — Highways 

J.  G.  Brennan,  Chairman,     A.  S.  Haigh  Bernard  Blum,  Vice- 

F.  D.  Batchellor  J.  P.  Hallihan  Chairman, 
H.  D.  Blake  H.  A.  Hampton  T.  M.  Pittman 
H.  E.  Brink  W.  J.  Hedley  L.  J.  Riegler 
A.  P.  Button  Warren  Henry  Frank  Ringer 
A.  R.  Dewees  C.  D.  Horton  H.  M.  Shepard 
A.  F.  DoRLEY  Marc  Johnson  C.  K.  Smith 

G.  N.  Edmondson  R.  B.  Kittredge  W.  C.  Swartout 
C.  F.  Edwards  A.  E.  Korsell  C.  A.  Taylor 

P.  W.  Elmore  Fred  Lavis  V.  R.  Walling 

H.  L.  Engelhardt  E.  E.  Mayo  R.  E.  Warden 

H.  W.  Fenno  G.  p.  Palmer  J.  L.  Way 

P.  M.  Gault  W.  C.  Pinschmidt  W.  L.  Young 

Committee 

To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 

Progress  report — submitted  as  information page  ISO 

2.  Design  and  specifications  for  highway  crossings  at  grade  over  railway  tracks, 
both  steam  and  electric,  collaborating  with  Committee  1 — Roadway  and  Ballast,  and 
with  American  Society  of  Municipal  Engineers,  and  American  Transit  Association. 

Progress  report — submitted  as  information page  l.SO 

3.  Comparative  merits  of  various  types  of  grade  crossing  protection,  collaborating 
with  Committee  10 — Signals  and  Interlocking,  Signal  Section,  AAR,  and  Highway 
Research  Board. 

Progress  report — submitted  as  information page  151 

4.  Prepare  drawings  of  typical  location  for  grade  crossing  signals,  for  various  degrees 
of  crossing  angles,  collaborating  with  Signal  Section,  AAR. 

Progress  report — submitted  as  information page  1.52 

5.  Method  of  classifying  grade  crossings  with  respect  to  hazard. 
No  report. 

6.  Report  requisites  for  flexible  barrier  type  of  grade  crossing  protection,  collaborat- 
ing with  Signal  Section,  AAR. 

No  report. 

7.  Recommend  methods  of  protecting  highway  crossings  and  flangeways  against 
obstructions  and  damage  caused  by  use  or  passage  of  highway  work  equipment. 

Final  report — with  recommendation  for  inclusion  in  the  Manual page  152 

The  Committee  on  Highways, 

J.  G.  Brennan,  Chairman. 

Bulletin  421,  December,   1940. 


L 


149 


150 Highways 

Report  on  Assignment  1 

Revision  of  Manual 

P.  M.  Gault  (chairman,  subcommittee),  Bernard  Blum,  H.  E.  Brink,  A.  P.  Button, 
P.  W.  Elmore,  A.  S.  Haigh,  Maro  Johnson,  R.  B.  Kittredge,  E.  E.  Mayo,  G.  P. 
Palmer,  T.  M.  Pittman,  Frank  Ringer,  H.  M.  Shepard,  C.  K.  Smith,  C.  A.  Taylor, 
V.  R.  Walling,  J.  L.  Way,  W.  L.  Young. 

Several  letters  have  been  received  by  the  chairman  of  the  committee  to  the  effect 
that,  for  daylight  indication,  a  white  background  on  the  reflectorized  cross  buck  sign, 
Fig.  903-A  of  the  Manual  (AAR  Signal  Section  1691A),  gives  a  better  indication  than 
the  present  standard,  especially  where  trees  or  other  dark  objects  form  the  background. 
The  subcommittee,  collaborating  with  Committee  VIII  of  the  Signal  Section,  is  making 
a  thorough  study  to  determine  whether  the  present  standard,  which  calls  for  white  letters 
on  a  black  background,  should  be  reversed  so  that  the  letters  will  be  black  on  a  white 
background.  Representatives  of  this  committee  have  been  designated  to  confer  with 
designated  representatives  of  Committee  VIII  of  the  Signal  Section  to  make  the  study 
and  such  tests  and  observations  as  may  be  necessary  to  determine  if  any  change  in  the 
present  standard  should  be  made. 

Progress  is  being  made  with  the  study  and  it  is  expected  that  report  will  be  made 
to  the  next  annual  convention. 


Report  on  Assignment  2 

Design  and  Specifications  for  Highway  Crossings  at  Grade  Over 
Railway  Tracks,  Both  Steam  and  Electric 

Collaborating  with  Committee  1 — Roadway  and  Ballast,  and  with  American 
Society  of  Municipal  Engineers  and  American  Transit  Association 

W.  J.  Hedley  (chairman,  subcommittee),  F.  D.  Batchellor,  H.  D.  Blake,  A.  P.  Button, 
G.  N.  Edmondson,  C.  F.  Edwards,  P.  W.  Elmore,  H.  W.  Fenno,  J.  P.  Hallihan, 
A.  E.  Korsell,  Fred  Lavis,  H.  M.  Shepard,  C.  K.  Smith,  R.  E.  Warden,  J.  L.  Way, 
W.  L.  Young. 

The  subcommittee  has  under  consideration  a  design  and  specifications  for  a  solid 
plank  crossing.  Its  investigation  to  date  has  raised  a  doubt  as  to  whether  there  is  need 
for  a  design  and  specification  for  this  type  of  crossing.  The  subcommittee  is  to  continue 
its  study  and  make  a  thorough  canvass  of  the  situation  with  the  view  of  developing  a 
design  and  specification  for  a  solid  plank  crossing  for  use  where  that  type  of  crossing 
will  prove  economical. 


Highways      151 

Report  on  Assignment  3 

Comparative  Merits  o£  Various  Types  o£  Grade  Crossing  Protection 

Collaborating  with  Committee  10 — Signals  and  Interlocking,  Signal 
Section,  AAR,  and  Highway  Research  Board 

H.  M.  Shepard  (chairman,  subcommittee),  F.  D.  Batchellor,  H.  D.  Blake,  H.  E.  Brink, 
A.  R.  Dewees,  A.  F.  Dorley,  C.  F.  Edwards,  H.  W.  Fenno,  J.  P.  Hallihan,  H.  A. 
Hampton,  Warren  Henry,  R.  B.  Kittredge,  Fred  Lavis,  W.  C.  Pinschmidt,  C.  K. 
Smith,  R.  E.  Warden. 

This  subcommittee  has  confined  its  work  this  year  largely  to  assembling  data  on 
various  types  of  sheet  reflectorized  crossbuck  signs  now  on  the  market,  which  have  been 
developed  for  use  at  grade  crossings.  It  is  claimed  that  these  signs  can  be  manufactured 
in  quantity  lots  for  about  one-tenth  the  cost  of  reflector  button  crossbuck  signs.  Con- 
sideration has  been  given  to  the  following  materials: 

Mir-0-Ray. — Manufactured  by  Arcturus  Radio  Tube  Company,  Newark,  N.J.  The 
manufacture  of  this  material  has  been  temporarily  suspended. 

Alzak. — Manufactured  by  the  Reflecting  Metal  Corporation,  Chicago.  These  signs  are 
made  with  Arbuckle  reflecting  metal,  and  it  is  claimed  that  they  can  be  seen  750  ft.  away 
at  night  and  clearly  read  at  500  ft.  Test  signs  are  being  made  by  the  manufacturer  and 
will  be  erected  at  a  grade  crossing  in  Chicago  for  test  of  visibility  and  wear. 

Scotcklite  Reflectors. — Manufactured  by  the  Minnesota  Mining  &  Manufacturing 
Company,  St.  Paul,  Minn.  This  is  a  luminous  material  using  a  powdered  glass  for  reflect- 
ing hght  and  is  said  to  be  waterproof,  with  visibility  to  1,000  ft.  and  legibility  at  400  ft. 
The  material  is  cemented  to  a  wooden  crossbuck  sign  and  the  letters  are  painted  on  the 
material.  These  signs  can  also  be  used  on  a  metal  base.  A  demonstration  was  made  for 
Committee  9  at  Chicago  in  June.  Two  signs  have  been  erected  at  113th  street  and  Rock- 
well street  in  Chicago  for  test  as  to  wearing  qualities.  These  were  placed  in  service 
August  21,  1940. 

Permi-base. — Manufactured  by  the  Prismo  Safety  Corporation,  Huntingdon,  Pa. 
This  is  the  same  material  as  Scotchlite,  being  the  trade  name  under  which  it  is  being 
sold  in  the  East. 

Decalcomania  Transfer  Process. — Manufactured  by  The  Cuneo  Press,  Chicago.  This 
is  a  waterproof  reflecting  material  on  paper  backing  which  can  be  applied  to  a  wood  or 
metal  sign  by  simply  wetting  the  material,  removing  the  paper  and  immediately  applying 
to  the  sign  with  a  roller.  The  letters  are  printed  on  the  material  before  it  is  applied  so 
that  no  sign  painting  is  necessary.  Visibility  and  legibility  should  be  the  same  as  Scotch- 
lite  or  Permi-base.  One  of  these  signs  was  demonstrated  to  Committee  9  at  Chicago  in 
June.  Two  of  them,  on  masonite  base,  were  placed  in  service  at  lOSth  and  Rockwell 
streets  in  Chicago  on  August  3,  1940,  for  test. 

The  sheet  reflectorizing  materials  herein  mentioned  appear  to  have  possibilities  from 
a  railroad  standpoint. 

Several  crossbuck  signs  with  sheet  reflecting  material  have  been  tested  in  Minnesota 
and  North  Dakota.  One  installation  has  been  in  place  for  more  than  a  year.  Piers  in  the 
center  of  streets  under  16  bridges  in  Minneapolis  have  had  this  material  applied  to  in- 
crease their  visibility  at  night.  The  committee  understands  that  these  installations  have 
been  entirely  successful  to  date. 


152 Highways 

Scotch  Flasher. — Manufactured  by  The  Scotch  Flasher  Display  Company,  Wichita, 
Kan.  This  is  a  reflector  button  sign  operated  by  a  dry  cell  battery  with  a  shutter  so  as 
to  give  a  flashing  effect.  The  visibility  is  claimed  to  be  2,250  ft.  A  hotel  demonstration 
was  viewed  by  Committee  9  in  Chicago  in  June.  Some  experimental  installations  are 
being  made  in  Illinois  for  approach  warning  signs  for  railroad  grade  crossings. 


The  report  is  presented  as  information  with  the  recommendation  that  the  subject 
be  continued. 


Report  on  Assignment  4 

Prepare  Drawings  of  Typical  Location  for  Grade  Crossing  Signals, 
For  Various  Degrees  of  Crossing  Angles 

Collaborating  with  Signal  Section,  AAR 

A.  P.  Button  (chairman,  subcommittee),  A.  F.  Dorley,  H.  L.  Engelhardt,  H.  W.  Fenno, 
P.  M.  Gault,  A.  S.  Haigh,  H.  A.  Hampton,  W.  J.  Hedley,  Warren  Henry,  C.  D. 
Horton,  Maro  Johnson,  A.  E.  Korsell,  W.  C.  Pinschmidt,  L.  J.  Riegler,  C.  K.  Smith, 
W.  C.  Swartout,  C.  A.  Taylor. 

The  subcommittee  has  endeavored  to  carry  out  its  assignment  during  the  year  and 
developed  drawings  for  the  location  of  flashing  light  signals.  However,  it  is  the  con- 
sensus of  Committee  9  that  each  case  must  be  decided  on  its  merits,  and  that  requisites 
for  the  location,  number  and  arrangement  of  automatic  signals,  automatic  gates  and 
auxiliary  signs  for  rail-highway  grade  crossing  protection  should  be  developed  rather 
than  drawings. 

Accordingly,  your  committee  recommends  that  the  assignment  be  changed  to  read 
as  follows:  "Requisites  for  the  location,  number  and  arrangement  of  automatic  signals, 
automatic  gates  and  auxiliary  signs  for  highway  grade  crossing  protection." 


Report  on  Assignment  7 

Recommend  Methods  of  Protecting  Highway  Crossings  and  Flange- 
ways  Against  Obstructions  and  Damage  Caused  by  Use  or 
Passage  of  Highway  Work  Equipment 

Bernard  Blum  (chairman,  subcommittee),  F.  D.  Batchellor,  H.  D.  Blake,  A.  R.  Dewces, 
A.  F.  Dorley,  G.  N.  Edmondson,  C.  F.  Edwards,  P.  W.  Elmore,  H.  L.  Engelhardt, 
C.  D.  Horton,  Maro  Johnson,  E.  E.  Mayo,  G.  P.  Palmer,  T.  M.  Pittman,  Frank 
Ringer,  W.  C.  Swartout. 

Your  committee  has  carried  out  its  assignment  by  preparing  the  following  instruc- 
tions to  highway  department  employees: 


Highways  1S3 


PROTECTING  HIGHWAY-RAILROAD  GRADE  CROSSINGS 
AND  FLANGEWAYS 

Recommended  Instructions  to  Highway  Department  Employees  for  Protecting 

Highway-Railroad  Grade  Crossings  and  Flangeways  Against  Obstructions 

AND  Damage  Caused  by  Passage  of  Highway  Work  Equipment 

To  Highway  Department  Employees: 

Your  attention  is  called  to  the  necessity  for  watchfulness  and  care  in  approaching, 
passing  over,  and  leaving  railroad  grade  crossings  with  highway  equipment,  in  order  to 
avoid  accidents  and  resultant  damage  to  equipment,  injury  to  persons,  or  derailment  of 
trains. 

The  following  rules  shall  be  strictly  adhered  to  by  all  employees  operating  highway 
department  equipment: 

1.  Stop  all  highway  road-working  equipment  before  crossing  railroad  tracks. 

2.  Do  not  depend  on  train  schedules.  Trains  may  be  expected  any  time  in  either 
direction  on  any  track.  Keep  a  sharp  lookout  and  do  not  cross  tracks  when  trains  are 
approaching. 

3.  Before  reaching  crossing,  raise  the  nose  and  blade  of  snow  plows  and  graders 
to  clear  rails  and  planks  on  crossing. 

4.  Stop  all  work  equipment  after  passing  over  railroad  crossings.  Make  a  careful 
inspection  of  the  crossing. 

5.  Clean  flangeways  and  crossing  of  any  material  that  might  derail  a  train. 

6.  If  equipment  is  stalled  on  crossing,  highway  employees  shall  do  all  in  their  power 
to  prevent  a  train  from  hitting  it. 


It  is  recommended  that  the  above  material  be  adopted  and  printed  in  the  Manual 
and  the  cooperation  of  the  Executive  Committee  of  the  American  Association  of  State 
Highway  Officials  be  enlisted  with  the  view  of  making  it  recommended  practice  for  state 
highway  departments. 


Report  of  Committee  24 — Cooperative  Relations 
With  Universities 

E.  T.  HowsoN,  Chairman,  R.  H.  Ford  F.  A.  Russell 
Lem  Adams  P.  M.  Gault  W.  C.  Sadler 
W.  J.  Cunningham  E.  M.  Hastings  F.  S.  Schwinn 

F.  T.  Darrow  Clark   Hungerford  Barton  Wheelwright 
R.  E.  Dougherty  R.  B.  Kittredge  C.  C.  Williams 

W.  D.  Faucette  B.  R.  Kulp  Committee 

To  the  American  Railway  Engineering  Association: 

Your  committee  submits  in  its  initial  report  a  statement  of  the  scope  and  purpose 

of  its  work  page  156 

It  also  reports  on  the  following  subjects: 

1.  Stimulate  greater  cooperation  between  railway  officials  and  officers  of  universities 
and  colleges  in  preparing  the  best  courses  of  instruction  to  meet  changing  railway  problems. 

No  report. 

2.  Call  to  the  attention  of  universities  and  colleges  such  information  and  conclusions 
developed  by  the  Association  as  thought  to  be  of  special  interest  or  value  to  them. 

No  report. 

3.  Develop  means  of  bringing  to  the  attention  of  railway  managements  the  value 
of  a  technical  education  as  a  qualifying  factor  for  young  men  desiring  to  enter  railway 
service  with  a  view  to  advancement. 

Progress  report — submitted  as  information   page  157 

4.  Stimulate  a  greater  interest  in  the  science  of  transportation  among  university  and 
college  students,  and  create  thereby  a  greater  appreciation  of  the  place  of  transportation 
in  our  national  economic  structure. 

Progress  report — submitted  as  information  page  169 

5.  Develop  means  whereby  facilities  of  the  universities  may  be  made  more  directly 
available  for  research  work  of  the  Association  and  the  railway  industry  by  cooperative 
effort  between  the  staffs  of  the  universities  and  the  committees  of  the  Association. 

Progress  report — submitted  as  information  page  170 

6.  Stimulate  a  greater  appreciation  among  university  and  college  authorities  of  the 
fundamental  importance  of  instruction  in  transportation  and  economics,  and  of  the 
necessity  for  assigning  men  of  adequate  ability,  experience  and  fitness  for  such  teaching. 

No  report. 

7.  Cooperate  with  organizations  of  university  and  college  students  engaged  in  study 
or  discussion  of  engineering  or  transportation  matters  and  contribute  to  their  activities 
in  such  manner  as  may  be  mutually  arranged. 

Progress  report — submitted  as  information  page  171 

The  Committee  on  Cooperative  Relations 
With  Universities, 

E.  T.  Howson,  Chairman. 

Bulletin  421,  December,  1940. 

ISS 


156  Cooperative   Relations   With   Universities 


Statement  of  Scope  and  Purpose 

Appointed  shortly  before  the  last  convention  of  this  Association,  your  committee 
on  Cooperative  Relations  with  Universities  presents  its  first  report.  Its  work  during  the 
year  has  been  largely  exploratory  and  has  consisted  primarily  of  the  formulation  of 
measures  to  gather  the  information  called  for  in  the  assignments  given  it.  The  reports 
that  the  subcommittees  present  are,  therefore,  of  progress.  In  its  first  report,  the  com- 
mittee beUeves  it  desirable  also  to  present  a  brief  over-all  statement  of  the  purpose  and 
scope  of  its  work. 

In  a  way,  the  work  of  this  committee  is  less  direct  and  immediate  in  its  objectives 
than  that  of  most  of  the  other  committees  of  this  Association.  It  is  not  deahng  with 
materials  or  detailed  practices  of  working;  neither  is  it  concerned  with  the  immediate 
present.  Rather,  it  is  dealing  with  a  problem  of  management,  the  full  impact  of  which 
will  not  be  felt  for  some  years.  Its  work  is,  however,  of  fundamental  importance  to  the 
permanent  well  being  of  the  railway  industry. 

The  railways  comprise  one  of  our  largest  industries.  They  constitute  a  vital  hnk  in 
the  industrial  life  of  America,  for  America  is  a  land  of  vast  distances  and  the  railways 
offer  the  only  economical  means  for  the  transportation  of  the  raw  materials  and  food 
products  from  the  mines  and  the  farms  of  the  Central  West  and  the  far  West  to  the 
industrial  centers  of  the  East.  Furthermore,  as  America  enters  more  largely  into  world 
markets,  it  is  forced  to  meet  the  competition  of  other  countries  with  their  lower  wage 
scales.  This  requires  maximum  economy  in  transportation.  Again,  the  railways  are  now 
meeting  increasingly  acute  competition  from  new  and  alert  agencies  of  transportation,  a 
condition  which  creates  still  further  problems  of  another  character. 

All  these  conditions  place  heavy  demands  upon  those  who  bear  the  responsibihty  of 
management  in  the  railway  industry.  These  demands  will  become  heavier  in  the  days 
that  are  ahead.  Will  the  railways  be  able  to  meet  these  demands  adequately  with  the 
plans  now  in  vogue? 

A  far  larger  proportion  of  the  more  promising  young  men  are  now  enjoying  the 
privileges  of  a  college  education  than  in  any  previous  generation.  It  is  pertinent  to 
inquire  whether  as  many  of  these  college-trained  young  men,  and  especially  those  with 
greater  promise  of  executive  ability,  are  now  being  attracted  to  railway  service  as  a 
career  as  was  true  a  generation  or  two  ago?  And  are  the  colleges  and  universities 
giving  these  men  the  education  and  the  view  point  that  best  prepare  them  for  progress 
in  railway  service? 

In  the  early  days  of  railway  development  in  this  country,  the  railways  attracted 
many  young  engineers  into  their  construction  activities;  in  fact,  they  provided  the  major 
outlet  for  civil  engineers  and  the  bold  nature  of  the  work  challenged  men  of  initiative 
and  resourcefulness,  not  a  few  of  whom  developed  into  executives  of  note.  Today,  the 
era  of  construction  is  closed,  and  this  avenue  of  initial  employment  no  longer  exists. 

The  effect  on  the  colleges  has  been  immediate.  Some  have  abandoned  their  courses 
in  railway  construction  and  have  substituted  no  railway  transportation  instruction  there- 
for. Within  recent  months  one  of  our  great  universities  has  made  public  announcement 
of  the  abandonment  of  its  long-maintained  department  of  railway  transportation  and  the 
scattering  among  other  courses  of  the  instruction  previously  offered  there.  Many  col- 
leges are  openly  discouraging  their  graduates  from  entering  railway  service. 

It  is  true  that  the  railways  are  no  longer  building  long  extensions  into  new  and 
unsettled  areas.  On  the  contrary,  they  are  actually  taking  up  more  miles  of  lines  today 
than  they  are  budding.  Their  principal  activities  in  the  field  of  construction  are  the 


Cooperative    Relations    With    Universities  157 

rebuilding  of  facilities  to  meet  new  and  changing  conditions  and  the  reconstruction  of 
lines  and  structures  to  effect  greater  economy  or  efficiency  in  transportation.  But  such 
activities  require  intensive  study  of  present  and  possible  practices,  with  relation  to  costs, 
both  of  construction  and  of  operation,  and  call  for  the  display  of  analytical  ability  as 
great  as  or  even  greater  than  that  of  the  pioneer  engineers  who  located  our  railways 
over  the  mountains  and  across  the  plains. 

But  it  is  ability  of  a  different  character  and  developed  through  education  and 
training  of  widely  differing  purpose.  It  requires  a  more  thorough  appreciation  and 
knowledge  of  economics,  as  applied  to  transportation — a  greater  wilUngness  to  work  out 
refinements  in  practice  to  effect  economies  in  costs  and  to  increase  effectiveness  in 
service.  In  brief,  it  requires  a  far  greater  degree  of  exactness. 

To  the  young  man  of  engineering  education  who  accepts  this  view,  we  know  that 
the  railways  offer  real  opportunity.  No  industry  so  basically  important  in  character,  no 
industry  whose  business  totals  $3,000,000,000  to  $5,000,000,000  annually  or  that  employs 
a  million  to  a  million  and  a  half  persons,  can  fail  to  provide  opportunity  for  analytical 
and  executive  ability  of  high  order.  The  railways  do  offer  such  opportunities. 

It  is  contended  by  the  colleges  that  the  railways  fail  to  meet  the  competition  of 
other  industries  for  these  young  men.  And  it  must  be  admitted  that  there  is  much  evi- 
dence to  support  this  view.  On  the  other  hand,  not  a  few  railway  officers  contend  that 
the  colleges  have  failed  to  revise  their  courses  of  instruction  to  keep  pace  with  the 
changes  in  railway  operation  and  that  as  a  result  the  graduates  of  today  are  not  pre- 
pared either  in  view  point  or  training  for  their  needs  of  today.  It  must  be  admitted 
also  that  a  survey  of  college  courses  of  instruction  will  provide  much  in  support  of  this 
position. 

Your  committee  understands  that,  in  re-establishing  this  committee,  the  Board  of 
Direction  of  this  Association  had  in  mind  the  importance  of  (a)  bringing  about  the  edu- 
cation of  a  capable  group  of  young  men  in  the  railway  problems  of  today  and  the  days 
that  are  ahead  and  (b)  providing  for  these  men  opportunities  in  the  various  branches 
of  railway  service  comparable  with  those  presented  by  other  industries.  Through  the 
work  that  has  been  initiated  by  the  subcommittees,  it  is  hoped  to  bring  about  a  recog- 
nition among  college  and  university  authorities  that  the  railway  industry  does  offer 
opportunities  to  a  limited  number  of  properly  trained  young  men  equal  to  or  greater 
than  those  existing  elsewhere  and  a  corresponding  recognition  among  railway  manage- 
ments that  it  is  to  their  interest  to  give  the  same  or  even  greater  consideration  to  the 
selection  and  development  of  their  personnel  that  they  do  to  their  physical  plant  and 
its  use. 


Report  on  Assignment  3 

Develop  Means  of  Bringing  to  the  Attention  of  Railway 
Managements  the  Value  of  a  Technical  Education 

As   a   Qualifying   Factor   for   Young   Men   Desiring   to   Enter 
Railway  Service  with  a  View  to  Advancement 

F.    S.    Schwinn    (chairman,    subcommittee),    R.    E.    Dougherty,    R.    H.    Ford,    R.    B. 
Kittredge,  Barton  Wheelwright,  C.  C.  WilHams. 

In  approaching  this  subject,  your  committee  has  attempted  first  to  answer  the  ques- 
tion— why  should  railway  managements  be  interested  in  employing  technically  educated 
men?  This  question  has  naturally  led  to  another — why  should  technically  educated  men 


158 Cooperative   Relations   With    Universities 

desire  railway  employment?  It  is  quite  evident  that  there  must  be  a  sufficiently  attrac- 
tive incentive  in  order  to  influence  a  desirable  class  of  young  men,  with  either  a  technical 
or  non-technical  college  education,  to  seek  employment  on  a  railway.  If  the  probabihty 
of  ultimate  reward  is  definitely  present,  there  will  be  no  difficulty  in  attracting  the  best 
of  these  young  men  into   the  railway  industry. 

In  order  that  the  answers  to  these  two  questions  may  be  fully  developed,  the  com- 
mittee has  first  endeavored  to  show  what  the  railway  managements  offer  the  young  man 
with  a  technical  or  other  college  education  and  to  present  examples  of  what  such  young 
men  have  accomplished  in  the  past  when  they  associated  themselves  with  railways,  with, 
somewhat  as  a  summary,  the  views  of  a  few  railway  executives  on  this  subject.  In  later 
reports  it  is  proposed  to  explore  additional  phases  of  this  subject,  including  the  investiga- 
tion of  means  employed  by  other  industries  to  evaluate  and  absorb  such  men  and  the 
present  activities  of  those  railroads  which  now  recognize  the  desirability  of  fostering 
the  employment  of  men  who  have  received  desirable  preliminary  educational  preparation. 

What  Can  Railway  Managements  Offer? 

After  a  boy  has  outgrown  his  desire  to  wear  a  policeman's  uniform,  he  begins  to 
envision  himself  as  some  kind  of  a  manager  or  executive.  This  is  but  the  natural  result 
of  the  individualistic  tendencies  which  come  from  and  are  a  part  of  our  democracy. 
Usually,  the  young  man  will  tentatively  select  his  career  early  during  his  college  life,  and 
his  selection  will  be  influenced  to  a  large  extent  by  the  probable  reward,  either  imme- 
diate or  ultimate,  following  careful  preparation,  close  application  and  sincere  effort  to 
succeed  in  such  a  career.  The  most  accurate  indication  of  what  the  future  may  hold 
for  the  properly  equipped  man  who  elects  railroading  is  evidenced  by  the  measure  of 
success  that  has  been  attained  in  the  railway  field  by  technically  educated  men  and 
other  college  graduates  in  the  past. 

In  an  address  delivered  last  year  before  the  New  York  section  of  the  American 
Society  of  Civil  Engineers,  C.  E.  Smith,  vice-president  of  the  New  York,  New  Haven 
and  Hartford  Railroad  Company,  pointed  out  that  the  chief  executives  of  180,458  miles 
of  railway,  comprising  the  larger  and  more  important  systems  in  the  United  States,  were 
divided  as  follows:  36  percent  of  the  mileage  was  headed  by  civil  engineers;  40  percent 
of  the  mileage  was  directed  by  college  graduates  in  other  than  civil  engineering;  and  24 
percent  of  the  mileage  was  administered  by  graduates  of  the  school  of  hard  knocks. 
This  analysis  covered  31  large  railways  and  railway  systems  and  23  of  the  31  chief 
executives  were  college  graduates,  while  8  were  non-college  graduates.  Mr.  Smith  also 
furnished  data  concerning  the  heads  of  departments  on  these  same  railways  which  indi- 
cated that  college  graduates  (both  technical  and  non-technical)  headed  the  several  de- 
partments, based  on  the  percent  of  the  total  mileage,  as  follows:  accounting,  24  percent; 
purchases  and  stores,  26  percent;  operating,  28  percent;  traffic,  31  percent;  mechanical, 
47  percent;  miscellaneous  departments,  47  percent;  engineering  and  maintenance,  84  per- 
cent; and  law,  100  percent.  On  the  84  percent  of  the  mileage  whose  engineering  depart- 
ments were  headed  by  college  graduates,  these  officers  were  naturally  all  civil  engineers, 
but  in  addition,  civil  engineers  headed  the  operating  departments  on  20  percent  of  the 
mileage,  and  headed  miscellaneous  departments  on  29  percent  of  the  mileage. 

In  furnishing  this  information,  Mr.  Smith  writes:  "Of  course,  the  situation  changes 
from  time  to  time,  but  several  times,  when  I  have  made  these  analyses,  I  have  found 
that,  of  the  important  railroads,  35  percent  are  headed  by  civil  engineers,  40  percent  by 
other  college  graduates  and  25  percent  by  men  who  merely  graduated  from  the  school 
of  hard  knocks  and  did  not  have  a  college  training.  I  use  the  word  'merely'  because  .  .  . 
college  graduates  who  made  their  way  to  the  top  also  had  to  graduate  from  the  school 


Cooperative    Relations    With    Universities  ISQ 

of  hard  knocks — a  post  graduate  course  as  it  were".  Mr.  Smith  makes  the  further  com- 
ment: "The  astounding  and  amazing  feature  of  the  showing  of  civil  engineers  in  rail- 
roading is  that  much  less  than  35  percent  of  the  personnel  on  the  railroads  are  civil 
engineers.  While  I  have  no  statistics  to  support  an  estimate,  I  would  say  that  5  percent 
would  be  a  very  generous  estimate  of  the  proportion  of  civil  engineers  in  railroading, 
which  indicates  that  their  chances  of  getting  to  the  top  have  been  seven  times  the  chances 
of  all  others". 

In  an  address  delivered  before  the  Transportation  Section  of  the  Society  for  the 
Promotion  of  Engineering  Education  at  Berkeley,  Cal.,  on  June  24,  1940,  M.  C.  Blanch- 
ard,  chief  engineer  of  the  Coast  Lines  of  the  Atchison,  Topeka  and  Santa  Fe  Railway 
Company,  took  as  his  subject  "What  the  railways  offer  the  engineering  graduate".  After 
Usting  the  strictly  technical  opportunities  confronting  the  engineering  graduate,  Mr. 
Blanchard  said: 

In  addition  to  opportunities  for  promotion  along  .  .  .  technical  lines  .  .  . 
the  way  is  open,  as  it  has  never  been  before,  to  advancement  in  other  departments 
of  the  railways,  such  as  operating,  purchasing  and  traffic.  In  years  past  the  rail- 
ways .  .  .  were  generally  inclined  to  look  upon  the  engineer  as  a  technical  man 
quaUfied  for  advancement  only  along  the  line  of  his  training.  This  attitude  no 
longer  prevails,  the  railways  having  come  to  the  realization  that  the  man  educated 
in  the  fundamentals  of  mathematics  and  science  has  qualifications  superior  to 
those  not  so  equipped,  and  if  in  addition  to  his  education  he  possesses  those  other 
inherent  quahties  essential  to  advancement  in  any  line  of  business,  the  railways 
are  quite  ready  to  give  him  an  opportunity  ...  to  step  out  of  his  engineering 
environment  into  other  departments. 

In  making  the  above  statement,  I  have  in  mind  particularly  the  railroad  on 
which  I  am  employed  ...  In  the  last  twenty  years  .  .  .  numbers  of  men  from 
the  engineering  department  have  been  .  .  .  selected  for  service  in  other  spheres 
of  activity  .  .  .  These  men  are  making  good,  as  evidenced  by  the  fact  that  two  of 
them  are  now  general  managers,  one  is  assistant  to  the  operating  vice-president 
and  one  is  general  purchasing  agent  for  the  system. 

Mr.  Blanchard  concluded  with  the  statement  that  "...  I  feel  that  to  the  engi- 
neering graduate  who  is  transportation  minded;  who  is  alert,  energetic,  balanced;  who 
is  endowed  with  some  native  executive  ability ;  who  is  willing  to  shoulder  responsibilities 
and  to  undergo  the  hard  work  involved  in  each  step  of  advancement;  who  is  appre- 
ciative of  the  fact  that  he  will  be  in  competition  with  many  other  capable  and  ambitious 
men  ...  a  contest  in  which  his  engineering  education  should  be  of  advantage;  (to  such 
a  man)  the  railways  offer  an  opportunity  better  than  in  the  past,  and  on  a  par  with 
the  outlook  in  any  other  industry". 

At  the  same  meeting  (of  the  S.P.E.E.),  J.  W.  Williams,  chief  engineer  of  the  Western 
Pacific  Railroad  Company,  speaking  in  a  somewhat  similar  vein  on  the  subject  "What  a 
railway  expects  in  the  engineering  graduate",  said: 

The  railway  expects  the  engineering  graduate  to  be  equipped  with  a  sound 
foundation  of  engineering  education  and  trained  thought  processes,  by  means  of 
which  he  can  acquire,  through  e.xperience,  the  judgment  to  estimate  correctly 
the  problems  with  which  he  will  deal  and  arrive  at  reasonably  accurate  solutions. 
The  graduate  entering  railway  service,  who  is  qualified  by  character  and 
ability  and  who  is  equipped  with  a  suitable  education,  has  favorable  opportunity 
for  advancement,  not  only  in  engineering  positions,  but  also  in  administrative 
positions. 


160 Cooperative   Relations   With   Universities 

At  no  previous  time  have  the  railways  had  more  urgent  need  for  the  services 
of  highly  intelHgent  and  thoroughly  educated  young  engineers.  The  quantity  de- 
mand is,  perhaps,  not  as  great  as  in  the  days  of  railway  expansion,  but  the 
quality  requirement  is  higher  than  ever  before.  For  the  outstanding  graduate,  the 
railway  field  offers  exceptional  opportunity  for  success. 

Also  at  this  S.P.E.E.  meeting,  W.  H.  Kirkbride,  chief  engineer  of  the  Southern 
Pacific  Company,  taking  for  his  subject  "After  graduation — ^What?"  referred  to  the 
new  occupations  that  are  coming  forth  in  an  ever-expanding  world  and  said:  "What 
better  personnel  could  be  found  for  such  occupations  than  the  men  with  engineering 
education?  Note,  I  said  engineering  education,  not  engineers,  and  herein  lies  the  impor- 
tant point  of  the  theme  I  present:  engineers  should  be  educationally  equipped  to  assume 
many  positions  in  our  complicated  social  economy  that  are  far  from  pure  engineering". 
In  closing  his  address,  Mr.  Kirkbride  remarked: 

Railroads  have  tried  various  schemes  of  selection  of  personnel  with  particular 
reference  to  advancement  to  the  higher  positions  .  .  .  The  exact  method  of  how 
a  graduate  of  a  university  is  to  obtain  employment  with  a  railroad  and  acquire 
the  experience  that  will  enable  him  to  advance  to  positions  of  greater  responsi- 
bility is  to  my  mind  a  matter  of  secondary  importance.  More  important  is  to 
show  that  the  opportunity  exists. 

In  concluding,  may  I  state  that  I  have  endeavored  to  show  that  this  oppor- 
tunity does  exist;  that  the  railroads  are  not  a  thing  of  the  past  and  that  a  large 
field  of  endeavor  exists  for  those  who  wish  to  try ;  but  paraphrasing,  in  part, 
the  recent  remarks  of  a  world  statesman,  let  us  say  we  can  only  offer  you  labor 
and  sweat  .  .  . 

From  the  1940  report  of  the  Transportation  Committee,  E.  T.  Howson,  chairman,  to 
the  Civil  Engineering  Division  of  the  Society  for  the  Promotion  of  Engineering  Education, 
the  following  is  quoted: 

Their  (the  railways')  principal  activities  in  the  field  of  construction  are  the 
rebuilding  of  facihties  to  meet  new  and  changing  conditions  and  the  reconstruc- 
tion of  lines  and  structures  to  effect  greater  economy  or  efficiency  in  transporta- 
tion. Such  activities  .  .  .  call  for  the  display  of  analytical  abiUty  as  great  as  or 
even  greater  than  that  of  the  pioneer  engineers  .  .  . 

But  it  is  abihty  of  a  different  character  and  developed  through  education  and 
training  of  widely  differing  purpose  ...  In  brief,  it  requires  a  far  greater  degree 
of  exactness. 

To  the  young  man  of  engineering  education  who  accepts  this  view,  the  rail- 
ways offer  real  opportunity.  No  industry  so  basically  important  in  character  .  .  . 
can  fail  to  provide  opportunity  for  analytical  and  executive  ability  of  high 
order.  The  railways  do  offer  such  opportunities  .  .  . 

A  Umited  number  of  railways  have  offered  engineering  graduates  employment  as 
student  apprentices.  In  a  few  cases,  this  practice  has  been  followed  for  many  years  and 
has  been  found  generally  successful.  Outstanding  in  this  effort  to  develop  and  use  the 
technically  educated  man  are  the  Pennsylvania  Railroad  and  the  Southern  Railway 
System.  A  future  report  will  describe,  in  some  detail,  the  poUcy  of  these  and  other 
railways  and  their  opinions  of  the  results  attained.  Your  committee  has  here  reviewed 
the  statements  of  several  railway  officers  at  some  length  to  show  affirmatively  that  the 


Cooperative    Relations   With    Universities  161 

railways  do  offer  opportunities  to  college  graduates  and  that  the  college-educated  man 
has  frequently  earned  recognition  beyond  that  which  may  be  expected  by  the  average 
individual  without  such  education. 

The  Railvsray  Executive's  View 

Little  would  be  gained  in  "bringing  to  the  attention  of  railway  managements  the 
value  of  a  technical  education  as  a  qualifying  factor  for  young  men  desiring  to  enter 
railway  service  with  a  view  to  advancement"  if  such  men  were  not  of  the  type  desired. 
To  develop  this  angle,  your  committee  addressed  a  few  railway  executives,  all  of  whom 
are  technically  educated  and  members  of  your  Association.  In  addition  to  requesting 
their  general  views  on  the  subject,  these  executives  were  requested  to  give  specific  an- 
swers to  five  questions.  Their  replies  go  far  toward  developing  the  true  answer  to  our 
first  question — why  should  railway  managements  be  interested  in  employing  technically 
educated  men. 

To  the  first  of  the  five  questions — do  you  favor  employing  this  class  of  men  (college 
graduates)  and  are  they  given  recognition  and  opportunities  for  advancement? — all 
replied  in  the  affirmative  although  four  replies  stressed  the  fact  that  educational  quali- 
fications alone  were  not  paramount  and  that  opportunities  were  offered  to  all  employees, 
while  two  replies  made  reference  to  the  difficulty  of  giving  adequate  recognition  and 
opportunity  because  of  restrictions  imposed  by  agreements  with  other  employees. 

Replies  to  the  second  question — In  what  manner  do  you  recommend  that  such  men 
be  selected? — ^were  nearly  uniform  in  suggesting  that  selections  be  made  through  per- 
sonal contacts  and  interviews  by  department  heads  and  that  natural  qualifications,  as 
well  as  educational  background,  must  be   considered. 

The  third  question — Coupled  with  practical  experience,  do  you  believe  that  these 
men  fill  the  requirements  of  advanced  positions  more  satisfactorily  than  men  without 
either  technical  or  general  college  education? — again  brought  generally  affirmative  an- 
swers, qualified,  however,  with  repeated  references  to  the  fact  that  the  requirements  of 
advanced  positions  go  beyond  the  basic  college  education. 

To  the  fourth  question — Do  they  progress  more  rapidly  than  men  without  a  college 
education? — the  replies  were  generally  affirmative,  although  two  executives  here  again 
stressed  the  importance  of  other  factors  without  which  the  college  man's  progress  would 
be  slower. 

The  last  question  submitted  by  your  committee  was — Do  they  remain  with  the 
property  as  well  as  men  without  such  education  who  may  rise  from  the  ranks?  The 
experience  of  only  one  executive  prompted  an  affirmative  answer  while  four  replies 
were  definitely  negative  and  one  stressed  the  need  that  management  advance  the  men 
selected  with  sufficient  frequency  to  hold  their  enthusiasm. 

Because  of  the  important  bearing  of  the  comments  and  opinions  expressed  by  these 
executives  upon  both  the  desirability  of  employing  college  graduates  and  on  the  type  of 
college  graduate  to  be  employed,  partial  quotations  from  their  letters  are  included: 

From  L.  W.  Baldwin,  chief  executive  officer  of  the  Missouri  Pacific  Lines: 

In  employing  new  men  we  naturally  favor  selecting  those  giving  the  greatest 
promise  of  useful  and  helpful  service  and  those  considered  capable  of  development 
which  will  fit  them  for  promotion.  While  education  is  important,  the  traits  of 
integrity,  industry,  loyalty  and  the  ability  for  harmonious  teamwork  are  fully 
as  important.  Natural  ability  to  use  one's  head  and  good  common  sense,  coupled 
with  a  pleasing  personality,  will  go  far  towards  overcoming  any  handicap  due  to 
lack  of  college  training. 


162 Cooperative    Relations   With    Universities 

As  to  your  third  question,  (regarding  requirements  for  advanced  positions) 
I  would  say  that  the  answer  is  yes  in  general,  but  there  are  so  many  exceptions 
as  to  require  the  further  statement  that  a  college  education  is  far  from  the  most 
important  factor,  and  a  college  man  lacking  in  the  ability  to  secure  teamwork,  for 
example,  is  unsuited  for  an  advanced  position.  Probably  a  tabulation  of  men  hold- 
ing executive  positions  would  show  a  preponderance  of  college-trained  men  out  of 
proportion  to  the  number  of  college  men  in  service  and  this  preponderance  has  no 
doubt  increased  through  the  years. 

Do  college  men  progress  more  rapidly?  Again  there  are  so  many  exceptions 
and  so  many  other  considerations  as  to  require  caution  in  a  general  statement. 
The  non-college  man  usually  has  at  least  four  years  start  over  the  college  man 
of  the  same  age.  He  is  very  apt  to  over-estimate  the  handicap  of  not  having  had 
the  opportunity  for  college  and  if  he  is  of  the  right  kind,  will  dig  in  all  the  harder 
to  overcome  his  assumed  disability.  Many  college  men,  on  the  other  hand,  are 
similarly  apt  to  over-estimate  the  advantages  of  college  and  in  addition  to  being 
irked  by  the  nature  of  their  early  assignments  on  the  railroad,  are  apt  to  hold 
somewhat  aloof  from  their  fellow  non-college  employees.  But  the  college  man  who 
can  retain  the  correct  perspective  and  who  always  gives  his  best  to  the  tasks 
assigned,  will,  at  least  on  the  average,  be  able  to  progress  more  rapidly. 

Answer  to  the  last  question  (regarding  speed  of  progress)  is  probably  no,  for 
several  reasons.  Those  who  leave  railroad  service  early  usually  have  been  attracted 
by  other  lines  of  work  where  opportunities  for  rapid  advancement  seemed  better 
and  where  living  conditions  were  more  desirable  than  at  many  of  the  scattered 
points  on  a  railroad.  It  must  be  recognized  that  for  many  years  the  railroad  in- 
dustry has  not  been  expanding,  while  newer  industries  have  been  growing  rapidly, 
and   these  have,   therefore,   provided  many   more   opportunities   for   service. 

As  to  a  technically  trained  college  man  compared  to  a  non-technically  trained 
one,  it  is  my  opinion  that  there  is  little  choice  although  the  former  will  be  better 
fitted  for  an  early  start  in  some  departments  than  the  latter.  If  the  engineer 
can  retain  a  proper  perspective  and  sense  of  proportion,  his  training  in  exactness 
will  be  helpful.  But  many  engineers  never  seem  to  learn  that  a  product  is  no  more 
reliable  than  its  least  reliable  factor,  and  they  develop  a  hair-splitting  attitude 
which  becomes  a  serious  hindrance. 

From  Ralph  Budd,  president  of  the  Burlington  Lines: 

One  of  the  most  important  duties  of  the  railroad's  supervisory  forces  is  the 
careful  selection  of  new  employees.  In  the  initial  selection  of  employees,  thought 
should  be  given  to  how  well  such  persons  may  function,  not  only  for  the  imme- 
diate position  for  which  employed,  but  also  for  promotion  to  more  responsible 
duties.  In  all  branches  of  our  organization  are  young  men  and  women  who  have 
graduated  from  colleges  in  the  last  few  years.  They  were  not  employed  solely 
because  of  their  college  education  but  because,  in  addition  to  that,  they  had 
attributes  which  we  felt  would  make  them  desirable  employees  and  potential 
candidates  for  advancement. 

There  has  existed,  and  probably  still  does  exist  with  many,  some  prejudice 
against  the  employment  of  college  graduates,  principally  due,  I  think,  to  the  fact 
that  up  to  a  few  years  ago  ordinarily  only  those  from  families  of  substantial 
means  went  to  college  and  upon  graduation  some  of  them  declined  to  accept 
employment  except  in  preferred  occupations  and  with  a  better  than  average  start- 
ing salary.  Many  of  them  came  out  of  school  with  the  thought  instilled  into 


Cooperative    Relations    With    Universities  163 

their  minds  that  "the  world  was  waiting  for  them  with  open  arms"  and  that  they 
should  be  given  preference  over  those  less  fortunate  who  did  not  have  the  oppor- 
tunity to  acquire  a  higher  education.  Much  of  this  prejudice  has  been  dispelled 
in  recent  years.  The  picture  has  changed;  now  it  is  not  only  the  favored  few  who 
attend  college,  but  a  cross  section  from  our  entire  population.  A  majority  of  the 
college  graduates  nowadays  realize,  or  should  realize,  that  when  they  enter  the 
business  world,  ordinarily  they  must  start  at  the  bottom  and  often  in  employment 
in  which  they  can  not,  at  first,  if  at  all,  make  full  use  of  all  phases  of  their 
education. 

Your  inquiry  was  directed  not  only  to  the  question  of  the  value  of  a  tech- 
nical education  as  a  qualifying  factor  for  young  men  desiring  to  enter  railroad 
service  with  a  view  to  advancement,  but  also  regarding  college  men  who  are  not 
technically  educated  but  who  may  be  fitted  for  positions  on  the  railroad  not 
definitely  requiring  technical  preparation.  It  is  realized  that  certain  branches  of 
service,  such  as  engineering,  require  for  some  of  the  positions  those  with  a  tech- 
nical education,  but  there  are  many  places  in  our  service  where  a  non-technical 
education,  if  it  has  taught  a  young  man  to  think  clearly  and  to  carry  his  thoughts 
into  action,  should  be  of  great  benefit  insofar  as  concerns  making  progress  in 
railroad  service. 

Yes,  we  favor  employing  those  who  have  acquired  more  than  the  ordinary 
grade  or  high  school  education,  provided  they  have  the  other  attributes  considered 
necessary.  They  are  given  such  opportunities  for  advancement,  when  they  have 
demonstrated  their  ability,  as  the  requirements  of  the  service  and  the  labor  agree- 
ments permit.  We  all  realize  the  difficulty,  if  not  the  impossibility,  because  of  the 
seniority  rules  contained  in  the  labor  agreements,  of  giving  special  consideration, 
insofar  as  promotion  is  concerned,  to  those  with  unusual  attainments,  in  jobs 
controlled  by  the  provisions  of  such  agreements;  however,  when  an  opportunity 
arises  to  promote  a  person  from  the  ranks  into  what  is  referred  to  in  railroad 
terminology  as  an  "excepted  position"  the  situation  is  different.  From  there  on, 
abiUty  governs  rather  than  seniority  and  if  a  careful  selection  has  been  made  in 
the  initial  employment  of  those  with  a  college  education,  they  should  have  an 
advantage  when  it  comes  to  promotion.  We  recognize,  however,  that  there  are 
many  with  native  ability  who,  for  some  reason  or  other,  have  not  gone  to  college, 
and  we  do  not  favor  closing  the  door  to  such  persons,  either  for  initial  employ- 
ment or  for  promotion. 

While  we  realize  the  effectiveness  of  the  formal  training  programs  carried 
on  by  many  of  the  larger  industries,  which  programs  call  for  the  recruiting  of 
college  men  who  seem  to  be  especially  qualified  in  particular  fields  and  the 
training  of  them  over  a  period  of  months  or  years  in  various  branches  of  the 
service,  for  several  reasons  it  has  not  seemed  to  us  feasible  to  install  a  training 
program  of  that  pattern.  The  seniority  agreements  in  the  railroad  industry  would 
operate  against  the  effectiveness  of  such  a  plan  and  would  also  entail  a  much 
higher  cost  because  of  the  impossibility  of  realizing  on  any  productive  work  done 
by  such  trainees  during  the  early  period  of  their  employment.  There  is  one 
exception,  that  being  in  departments  not  covered  by  labor  agreements. 

Because  of  these  circumstances,  I  favor  a  different  form  of  recruiting.  It 
seems  to  me  that  our  problem  is  to  locate  young  men  of  ability  whose  general 
back  ground  education,  and  views  appear  to  make  them  desirable  for  railroad 
service,  looking  to  the  possibihty  of  their  promotion  to  supervisory  positions,  and 
then  absorb  them  into  service  as  vacancies  occur,  promoting  them  as  fast  as  their 


164 Cooperative    Relations   With    Universities 

ability,  the  financial  condition  of  the  company,  and  the  labor  agreements  will 
permit. 

To  function  to  the  highest  degree  in  supervisory  jobs,  more  knowledge  than 
that  ordinarily  gained  through  grade  school  and  high  school  education  is  required, 
or  at  least  is  of  great  help.  Of  course,  knowledge  itself  is  not  enough.  Such  posi- 
tions also  require  the  ability  to  secure  the  cooperation  of  others  and  to  think 
clearly  and  make  accurate  decisions  without  prolonged  dehberation. 

Many  young  people  with  college  education  who  enter  the  service  in  minor 
positions  feel  that  promotion  and  increase  in  salary  do  not  come  quickly  enough 
and  they  are  on  the  alert  for  other  opportunities  carrying  immediate  salary 
increases  and  what  appears  to  be  greater  opportunity  for  promotion. 

Without  raising  any  bar  to  the  employment  or  promotion  of  those  who  do 
not  have  a  college  education,  we  have  endeavored,  in  our  traffic  and  other  depart- 
ments, to  attract  young  men  and  women  with  exceptional  education.  So  far  as 
the  traffic  department  is  concerned,  there  seems  to  be  no  reason  for  distinguishing 
between  those  with  a  technical  education  and  those  with  a  liberal  arts  education, 
but  in  some  branches  of  the  service,  such  as  the  engineering  and  operating  depart- 
ments, the  technical  education  is,  of  course,  of  more  benefit,  and  in  the  accounting 
department  a  business  education  is  of  considerable  help. 

In  a  study  made  some  years  ago  of  two  groups,  one  consisting  of  those  who 
had  college  education  and  the  other  of  those  who  did  not  have  such  education, 
it  was  found  that  they  reached  their  first  official  position  at  the  same  average 
age,  but  that  the  group  which  did  not  have  the  advantage  of  a  college  education 
started  work  several  years  earlier  than  the  college  group.  We  have  made  no 
special  study  of  this  question  in  recent  years,  but  I  am  inclined  to  think  that 
one  made  now,  or  ten  years  hence,  would  show  a  different  picture;  in  that  those 
with  a  college  education  would,  on  the  average,  progress  faster  and  reach  higher 
positions  than  those  lacking  such  education.  I  believe  that  in  the  future  the 
majority  of  the  top  positions  in  railroad  service  will  be  filled  by  those  who  have 
prepared  themselves  for  such  positions  by  additional  years  in  school,  particularly 
in  technical  schools. 

From  J.  R.  Downes,  vice-president  of  the  Pennsylvania  Railroad  Company: 

For  many  years  we  have  placed  in  our  service,  and  trained  for  supervisory 
positions,  graduates  from  educational  institutions,  the  courses  of  study  at  which 
provide  the  technical  training  we  desire.  Electrical  engineers  and  mechanical  engi- 
neers are  usually  placed  in  our  motive  power  department  and  civil  engineers  in 
the  maintenance  of  way  department,  although  the  latter  department  also  employs 
some  electrical  engineers  for  training  in  the  signal  department.  These  courses 
cover  a  period  of  three  years'  work  before  the  young  men  are  placed  in  minor 
supervisory  positions. 

After  review  of  applications  by  staff  officers,  and  selection  of  the  young  men 
whom  it  is  desired  to  interview,  appointments  are  only  made  following  a  personal 
interview  with  the  candidates  so  selected  by  our  assistant  vice-president — chief  of 
motive  power,  the  assistant  chief  engineer  joining  in  the  review  of  graduate  civil 
engineers  applying  for  the  course  in  the  maintenance  of  way  department.  From 
these  personal  interviews,  judgment  may  be  formed  as  to  the  general  make-up  of 
applicants  and  their  interest  in  railroad  careers. 

During  these  special  apprenticeship  courses,  reports  are  made  each  six  months 
as  to  the  appHcation  and  ability  of  the  young  men  and  their  probable  advance- 


Cooperative   Relations   With   Universities 165 

ment;  this  with  the  idea  that  if  any  cadet  is  unsuited  for  railroad  work,  or  is 
not  considered  to  be  "officer  material,"  he  will  be  released  before  remaining  too 
long  with  the  railroad  in  order  to  have  early  opportunity  to  "find  himself"  in 
another  line  of  industry. 

Naturally,  one  of  technical  training,  interested  in  railroad  work,  selected  on 
the  basis  of  his  general  make-up  and  attainments  at  college  or  other  institution 
of  higher  education,  should  be  better  equipped  to  come  along  as  a  supervisory 
employee  than  one  without  such  training.  Of  course,  we  bring  along  from  time 
to  time  others  who  have  not  had  either  a  technical  or  a  general  college  education, 
but  who  display  such  qualities  of  practicability,  general  leadership,  and  admin- 
istration as  to  warrant  their  advancement. 

Technically  educated  men  who  come  to  the  railroad  after  selecting  a  railroad 
career  for  their  life-work  have  no  less  interest  in  remaining  with  us  than  men 
who  come  up  from  the  ranks.  From  time  to  time,  some  men  who  are  not  engi- 
neers but  who  have  a  general  college  education  or  its  equivalent  are  taken  into 
our  traffic  and  accounting  departments.  In  such  instances,  the  same  general 
observations  apply  as  have  been  outlined  in  the  foregoing  with  reference  to  men 
of  technical  education. 

From   C.  E.   Denney,  president   of   the  Northern  Pacific  Railway  Company: 

I  favor  employing  this  class  of  men  and  giving  them  recognition  and  oppor- 
tunities for  advancement  to  the  extent  that  it  can  be  done  in  fairness  to  other 
qualified  employees  who  have  not  had  the  advantage  of  a  technical  education. 

Selection  should  be  by  the  head  of  the  department  in  which  the  individual  is 
to  be  employed.  A  college  education  is  helpful,  but  not  necessary  in  meeting  the 
requirements  of  advanced  positions.  An  individual  with  a  college  education  should 
advance  more  rapidly  than  he  would  without  such  an  education. 

Many  college  graduates  are  not  willing  to  spend  the  time  as  apprentices  in 
the  railroad  or  any  other  business,  that  is  necessary  to  learn  the  business  and 
prepare  themselves  for  advancement.  Few  realize  that  they  are  freshmen  after 
graduation. 

The  first  requisite  of  anyone  entering  the  railroad  business  is  industriousness. 
A  college  education  is  helpful,  but  not  controlling.  The  college  graduate  who  has 
worked  or  assisted  in  working  his  way  through  school  is,  generally  speaking,  the 
most  likely  candidate  for  railroad  apprenticeship. 

From  E.  M.  Durham,  Jr.,  chief  executive  officer  of  the  Chicago,  Rock  Island  and 
Pacific  Railway  Company: 

As  I  know  you  reaUze,  it  is  practically  impossible  to  give  a  forthright 
answer  to  some  of  these  questions.  Based  on  my  experience,  I  think  I  would  say 
that  an  intelligent  educated  man  is  generally  superior  to  an  intelligent  man  with- 
out higher  education.  On  the  other  hand,  a  technical  education  generally  falls 
short  of  accomplishing  what  is  desired  if  a  man  does  not  have  this  quality. 
Briefly  stated,  what  the  railroad  seeks  in  employing  young  men  is  intelligence  or 
"horse-sense". 

From  H.  M.  Lull,  executive  vice-president  of  the  Southern  Pacific  Lines: 

As  a  general  proposition  a  college  education  should  equip  a  person  entering 
almost  any  kind  of  railroad  service  to  handle  his  job  better  and  give  him  some 
advantage  over  other  persons  similarly  employed  who  do  not  have  the  advantage 


166 Cooperative    Relations    With    Universities 

of  a  college  education.  However,  the  rules,  and  particularly  the  seniority  practices 
established  in  contracts  with  the  railway  employee  organizations,  prevent  manage- 
ments from  selective  choice  in  advancing  employees  who  have  superior  qualifica- 
tions, abihty  and  ambition — at  least  until  advancement  by  means  of  seniority  has 
gained  for  the  employee  a  sufficient  amount  of  experience  for  the  employee  to 
qualify  for  a  supervisory  position  where  the  organization  rules  and  seniority 
practices  do  not  apply. 

Under  these  circumstances  it  is  difficult  for  railroad  management  to  give 
recognition  and  opportunity  for  advancement  to  those  who  by  reason  of  superior 
educational  attainments,  natural  ability,  or  outstanding  work  performance,  are 
entitled  to  preferred  consideration.  I  do  not  know  of  any  means  whereby  this 
situation  can  be  overcome  in  a  way  to  encourage  college  men  to  take  railway 
employment,  except  in  the  limited  field  of  technical  work  where  contract  organiza- 
tion rules  and  seniority  practices  do  not  apply. 

On  our  road,  and  I  think  this  is  probably  true  on  most  roads,  there  are  rela- 
tively few  college  trained  men  in  service,  other  than  those  doing  more  or  less 
strictly  technical  work,  such  as  construction  and  maintenance  of  way  department 
engineers,  architects,  draftsmen,  and  mechanical  department  engineers,  designers, 
draftsmen,  metallurgists,  chemists,  etc. 

Obviously,  it  is  highly  desirable  that  men  employed  in  these  classifications  be 
quahfied  by  having  had  a  complete  technical  education  in  the  field  of  their  employ- 
ment and  as  a  rule  new  employees  are  selected  having  such  qualifications. 

I  think  it  is  generally  true,  particularly  in  recent  years,  that  the  proportion 
of  men  selected  for  advanced  positions  from  railroad  services  made  up  largely 
of  men  with  college  and  technical  education  represents  relatively  a  much  higher 
proportion  than  the  selection  of  men  for  such  advanced  positions  taken  from  other 
classifications  of  railway  employees.  If  there  were  more  college  trained  men  in 
other  branches  of  railway  service,  such  as  train  service,  station  service,  accounting 
and  clerical  service,  etc.,  the  chances  are  that  relatively  a  larger  proportion  from 
these  other   departments  would   attain   advanced  positions. 

Looking  to  the  future,  the  difficulty  of  college  trained  men  finding  employ- 
ment may  and  Hkely  will  result  in  a  gradual  infiltration  of  college  trained  men  in 
employee  classifications  other  than  the  technical  classifications.  With  the  situation 
as  it  now  exists  with  respect  to  advancement  being  governed  largely  by  seniority, 
their  advancement  opportunity  will  be  no  greater  than  their  fellow  employees 
not  having  the  advantage  of  college  education,  at  least  during  the  early  years  of 
their  employment.  Whether  college  trained  men  are  hkely  to  be  satisfied  and  remain 
in  railroad  work  under  such  circumstances  cannot  be  answered  from  any  experi- 
ence that  we  have  had.  The  chances  are  that  this  will  depend  largely  upon  the 
employment  situation  generally  and  the  opportunities  that  may  be  afforded  to 
obtain  employment  in  other  industries  offering  greater  opportunity  for  advancement 
in  recognition  of  superior  capacity  and  ambitious  effort. 

From  H.  R.  Safford,  senior  executive  assistant  of  the  Missouri  Pacific  Lines: 

I  believe  such  men  fill  the  requirements  of  advanced  positions  more  satisfac- 
torily than  men  without  either  technical  or  college  education  because  such  educa- 
tion gives  the  men  seme  advantage  that  is  beyond  mere  technical  knowledge  and 
gives  broader  opportunities  for  research  and  analysis.  It  is  expected  also  that 
everybody  who  has  a  technical  education  is  better  than  the  average  of  those 
who  have  not  had   it  and  while  there  are  defections  and   failures  among  such 


Cooperative    Relations    With    Universities 167 

people  in  the  application  of  the  ground  work  of  education,  I  think  on  the  whole 
the  answer  to  this  is  "yes". 

I  think  it  is  rather  hard  to  make  a  definite  reply  to  this  question  (as  to 
remaining  with  a  railway).  My  opinion  is,  however,  that  they  will  stay  longer 
with  the  property,  except  insofar  as  better  opportunities  may  be  offered  in  fields 
for  which  they  are  trained  beyond  the  scope  of  railroad  service. 

From  Robert  E.  Woodruff,  trustee  and  chief  executive  officer  of  the  Erie  Railroad 
Company: 

We  regularly  employ  a  few  each  year  for  our  operating  department;  some 
civil  engineers  for  the  maintenance  of  way  department ;  and  some  mechanical  and 
electrical  graduates  for  the  mechanical  department.  Those  in  the  mechanical  de- 
partment are  given  a  special  apprenticeship,  followed  by  opportunities  for  advance- 
ment. Those  in  the  maintenance  of  way  department  are  given  employment  in 
whatever  branch  vacancies  occur,  getting  some  experience  as  trackmen,  signalmen, 
foremen,  rodmen,  transitmen,  etc. 

One  cannot  generalize  on  this  question.  Half  of  our  higher  officers  are  college 
trained,  and  an  investigation  of  a  highly  technical  manufacturing  concern  devel- 
oped that  half  of  its  higher  officers  were  college  men.  To  be  a  good  manager,  a 
man  should  be  able  to  analyze  and  plan  and  also  to  organize  and  be  able  to  get 
along  with  men.  A  college  education,  with  a  knowledge  of  mathematics  and  engi- 
neering, helps  to  train  a  man  to  analyze  and  plan,  but  does  little  to  help  him  to 
organize  or  to  get  along  with  men.  Some  college  men  have  this  latter  ability. 
They  are,  in  general,  the  men  who  have  taken  part  in  college  activities,  been 
elected  by  the  student  body  to  elective  positions,  have  had  experience  in  man- 
aging clubs  and  organizations,  and  stand  out  definitely  as  managerial  material. 
Many  boys  spend  their  four  years  in  college  doing  nothing  but  studying  and, 
therefore,  miss  a  considerable  part  of  a  true  college  education.  In  other  words, 
college  trained  men  are  not  necessarily  good  managers  or  good  organizers.  Some 
men  who  have  never  been  to  college,  but  who  come  up  through  the  ranks,  have 
a  better  knowledge  of  men,  of  labor  conditions,  of  how  to  get  work  done,  of  how 
to  arouse  enthusiasm,  and  accordingly  are  selected  for  managerial  positions  in 
competition  with  college  graduates. 

The  college  training  is  not  the  principal  factor,  as  outhned  above.  A  college 
graduate  who  has  managerial  ability  and  who  is  wiUing  to  study  after  leaving 
college  should  progress  satisfactorily.  It  is  up  to  the  employing  officer  to  be 
careful  in  hiring  such  men  to  pick  only  those  who  really  want  to  take  up  railroad 
work  as  their  life  work,  and  not  to  hire  those  who  just  want  any  job  at  all. 
Then  it  is  up  to  the  management  to  see  that  these  men  who  are  employed 
receive  proper  training  and  are  moved  often  enough  to  retain  their  enthusiasm 
and  interest. 

From  F.  E.  Williamson,  president  of  the  New  York  Central  System: 

In  approaching  consideration  of  the  advantages  of  a  college  education  to  men 
entering  railroad  service,  it  must  be  remembered  that  there  are  certain  funda- 
mentals that  must  first  be  considered.  These  fundamentals  primarily  relate  to  the 
fact  that  there  are  certain  natural  elements  for  success  granted  to  some  men  and 
denied  to  others,  regardless  of  education  or  any  other  acquired  experience.  For 
example,  character,  personality,  tact,  perseverance,  inherent  executive  abihty, 
acceptibility  of  the  doctrine  of  hard  work,  and  all-around  intelligence  would  give 


168 Cooperative    Relations   With    Universities 

a  man  fortunate  to  possess  these  attributes  a  distinct  advantage  over  some  men 
without  them.  The  only  reasonable  comparison  that  can  be  made  is  the  one  that 
starts  with  the  assumption  that  these  innate  characteristics  are  common  to  both, 
and  if  that  is  assumed,  it  would  seem  to  be  absolutely  futile  for  anyone  to  argue 
that  an  education  is  not  an  advantage  to  a  young  man  entering  railroad  service, 
particularly  the  branches  where  technical  training  cannot  help  but  be  an  asset. 
No  one  can  possibly  argue  that  education  is  a  panacea  and  a  complete  answer 
for  the  success  of  a  young  man  in  any  walk  of  life  or  that  college  education  can 
be  a  substitute  for  brains  and  native  inteUigence.  It  would  seem  axiomatic  that, 
with  equal  natural  characteristics,  the  well-trained  educated  man  has  a  distinct 
advantage. 

The  New  York  Central  has  employed  many  men  with  a  college  education 
who  have  received  recognition  and  opportunity  for  advancement.  We  have  no 
fixed  method  of  engaging  men  of  this  calibre,  but  it  would  seem  that  that  is  a 
question  to  which  all  railroads  might  to  advantage  give  further  consideration. 

The  two  questions  as  to  past  rates  of  progress  and  remaining  with  the  prop- 
erty are  difficult  to  answer,  inasmuch  as  they  have  been  dependent  so  much  upon 
the  various  individuals  and  the  opportunities  that  have  been  opened  to  them 
through  various  changes  in  organization.  It  is  probably  difficult  in  any  large 
organization  to  retain  ambitious  young  college  men  seeking  more  rapid  advance- 
men  than  opportunity  has  permitted.  Some  in  later  years,  however,  have  expressed 
regrets  over  their  earlier  impatience. 

In  Review 

Your  committee  is  attempting  to  prepare  its  presentation  of  this  assignment  in  such 
a  manner  that  it  will  forcefully  direct  the  attention  of  railway  managements  to  the 
value  of  employing  young  men  with  college  educations  and  particularly  those  with 
technical  qualifications.  Considerable  information  already  has  been  collected  regarding 
the  practices  followed  by  other  industries  and  this  indicates  a  surprisingly  strong  interest 
in,  and  desire  to  employ,  qualified  college  men.  A  more  exhaustive  investigation  of  this 
angle  of  the  subject  will  be  attempted  in  the  next  report.  The  committee  feels  that 
certain  worth-while  preliminary  observations  may  be  drawn  from  the  informative 
matter  here  presented  and  that  such  observations  can  be  stated  briefly  as  follows: 

(1)  Railway  managements  should  be  interested  in  giving  employment,  training, 
encouragement  and  opportunity  to  desirable  college  men  in  order  to  provide  a  reserve 
from  which  to  draw  the  future  supervising  officers,  managers  and  executives,  and  in 
that  manner  enable  the  railways  to  meet  the  competition  of  other  transportation 
agencies  and  keep  abreast  of  industry  in  general. 

(2)  A  desirable  college  man  is  a  young  man  who,  in  addition  to  his  educational 
qualifications,  has  character  and  loyalty,  has  initiative  and  analytical  ability,  is  a  natural 
leader  and  organizer,  is  aggressive,  is  willing  to  take  and  execute  orders  and,  finally  but 
of  major  importance,  is  not  above  starting  at  the  bottom  of  the  ladder  or  afraid  of 
hard  work. 

There  are  several  phases  of  this  assignment  which  deserve  more  detailed  study  and 
analysis  and  your  committee  plans  to  develop  these  in  future  reports. 


Cooperative    Relations    With    Universities  Ib^J 


Report  on  Assignment  4 

Stimulate  a  Greater  Interest  in  the  Science  of  Transportation 
Among  University  and  College  Students 

And  Create  Thereby  a  Greater  Appreciation  of  the  Place  of 
Transportation  in  Our  National  Economic  Structure 

W.    C.    Sadler    (chairman,    subcommittee),    Lem    Adams,    W.    J.    Cunningham,    R.    B. 
Kittredge,  F.  S.  Schwinn,  C.  C.  Williams. 

The  modern  railroad  is  part  of  a  highly  competitive  industry,  which  fact  in  itself 
necessitates  a  superior  organization.  Therefore,  it  would  seem  most  desirable  that  there 
should  be  a  steady  influx  into  railroad  service  of  young  men,  whether  collegiate  or  not, 
of  that  high  quality  and  promise  consistent  with  the  attractions  of  the  railroad  industry. 

Young  men  of  today  are  very  cognizant  of  the  problems  of  life,  and  many  of  them 
should  be  given  credit  for  careful  thought  and  deliberation  in  the  selection  of  their  life's 
work.  The  best  young  men  do  not  follow  some  particular  vocation  accidentally.  Their 
decision  will  be  based  in  part  on  the  probabiUty  of  steady  employment,  and  the  wages 
available.  But  of  no  small  influence  will  be  the  attractiveness  of  the  work,  and  the 
interest  which  it  arouses.  Above  all,  the  student  desires  to  be  engaged  in  a  strong,  virile 
industry  which  will  offer  a  challenge  to  his  fullest  abilities.  He  has  found  his  education 
long  and  arduous,  quite  expensive,  but  usually  fascinating.  He  is  eager  for  the  arrival  of 
that  time  when  he  can  apply  his  academic  training;  and  incidentally,  he  wants  to  realize 
a  return  on  his  college  investment.  The  railroad  industry  has  a  very  personal  interest 
in  these  college  men. 

Cooperation  between  the  railroads  and  the  universities  may  well  take  that  active, 
energetic  form  which  will  ultimately  render  a  public  service,  in  addition  to  any  incidental 
mutual  benefits. 

Campus  meetings,  with  informal  addresses  on  problems  of  the  railroads  and  other 
transportation  agencies,  are  important  because  of  the  personal  contacts  they  offer,  as 
well  as  the  subject  matter  of  the  talks.  Student  inspection  trips  to  railroad  operations 
also  develop  personal  contacts,  as  well  as  coordinating  the  academic  and  practical  phases 
of  railroading.  A  properly-equipped  library,  of  a  size  appropriate  to  the  circumstances, 
is  indispensable;  and  where  possible  it  might  well  be  augmented  with  museum  pieces. 
Even  the  opportunity  of  student  summer  employment  at  common  labor  will  awaken  a 
fuller  appreciation  of  the  true  significance  of  a  large  railroad  in  operation. 

The  committee  proposes  to  develop  this  subject  further  during  the  next  year  to 
determine  specific  means  and  methods  of  obtaining  a  fuller  appreciation  among  all  col- 
lege students  of  the  basic  importance  of  the  transportation  industry  in  our  economic  order. 


170  Cooperative    Relations    Wi  th    Universities 


Report  on  Assignment  5 

Develop   Means   Whereby   Facilities   of  the   Universities   May   Be 

Made  More  Directly  Available  for  Research  Work  of 

the  Association  and  the  Railway  Industry 

By  Cooperative  Effort  Between  the  Staffs  of  the  Universities  and 
the  Committees  of  the  Association 

F.    A.    Russell    (chairman,    subcommittee),    Lem    Adams,    W.    J.    Cunningham,    R.    E. 
Dougherty,  R.  H.  Ford,  Barton  Wheelwright. 

It  is  the  thought  of  the  committee  that  its  first  activity  should  be  to  develop  by 
means  of  a  questionnaire  as  complete  information  as  possible  regarding  the  present 
facilities,  personnel,  activities,  and  interests  of  the  various  schools  bearing  on  railway 
problems,  as  well  as  a  compilation  of  the  subjects  already  investigated  and  the  reports 
that  are  available  for  distribution. 

Information  of  this  character  can  be  collected  most  readily  from  the  colleges  giving 
engineering  degrees,  of  which  there  are  about  145  in  the  United  States.  A  questionnaire 
was  sent  to  125  of  these  schools  as  it  was  thought  best  not  to  contact  similar  schools  in 
Canada  at  this  time  because  of  the  unsettled  conditions  now  prevailing  in  the  country 
by  reason  of  the  war.  This  questionnaire  included  the  following  questions: 

1.  What  faciUties  do  you  have  available  for  research? 

2.  In  what  fields  are  you  best  equipped  in  personnel,  experience  and  equipment? 

3.  What  projects  do  you  now  have  under   way   or  recently   completed? 

4.  What  work  have  you  done  in  recent  years  for  or  of  special  interest  to  the 
railroads  ? 

5.  Would  you  be  interested  in  doing  more  work  along  lines  which  have  a  bearing 
on  railway  activities? 

Because  of  a  late  start  in  sending  out  the  questionnaire  and  because  the  early  fall 
months  comprise  an  extremely  busy  period  for  schools  in  getting  the  new  year's  program 
under  way,  response  to  the  questionnaire  has  not  been  complete,  but  the  answers  are 
coming  in  slowly.  As  of  November  1,  about  40  of  the  125  schools  solicited  had  rephed, 
submitting  a  large  amount  of  information  of  a  diversified  character,  much  of  which  will 
be  interesting  and  valuable  to  the  railways  when  made  available  to  them  in  future  reports 
of  this  committee. 


Cooperative    Relations    With    Universities  171 


Report  on  Assignment  7 

Cooperate  with  Organizations  o£  University  and  College  Students 

Engaged  in  Study  or  Discussion  o£  Engineering 

or  Transportation  Matters 

And  Contribute  to  Their  Activities  in  Such 
Manner  as  May  Be  Mutually  Arranged 

P.  M.  Gault  (chairman,  subcommittee),  F.  T.  Darrow,  W.  D.  Faucette,  Clark  Hungerford, 
F.  A.  Russell,  C.  C.  Williams. 

The  deans  of  17  colleges  located  in  various  sections  of  the  United  States  and  Canada 
were  invited  to  submit  suggestions  pertinent  to  the  assignment  of  the  subcommittee. 
None  of  those  contacted  is  represented  on  the  committee. 

Replies  were  received  from  14  of  those  to  whom  the  inquiry  was  addressed,  each 
of  whom  expressed  a  desire  to  cooperate  with  the  railroads  in  any  way  that  would  be 
mutually  helpful  to  the  railroads  and  the  students.  Following  is  a  brief  digest  of  the 
suggestions  received. 

1.  Lectures  before  student  gatherings  by  railroad  men  engaged  in  various  branches 
of  service,  these  lectures  to  be  given  by  specialists  before  small  groups  of  students  who 
are  interested  in  specialized  subjects  or  by  speakers  who  may  be  able  to  bring  a  message 
of  interest  to  the  student  body  as  a  whole. 

2.  Employment  of  students: 

(a)  Summer  work,  looking  to  permanent  employment  after  graduation. 

(b)  Graduates  who  are  especially  interested  in,  or  adapted  to,  railroad  work. 

(c)  Part  time  employment  of  students  while  still  in  school.  Generally  speaking, 
this  would  mean  that  two  students  would  be  fining  one  railroad  job,  one  being 
in  school  while  the  other  is  working  and  alternating  at  definite  pre-arranged 
times  such  as  every  four  or  six  weeks. 

3.  Conducting  research  work  on  railway  problems  through  college  laboratories  by 
and  with  students. 

4.  Distribution  of  railroad  publications  and  literature  bearing  on  transportation  to 
college  libraries. 

5.  English  composition  assignments  covering  certain  features  of  railroad  transpor- 
tation. The  AREA  might  establish  either  cash  prizes  or  medal  awards  to  encourage 
competition. 


Report  of  Committee  27 — Maintenance  of  Way 
Work  Equipment 

G.  R.  Westcott,  Chairman,  E.  C.  Jackson  C.  H.  R.  Howe,  Vice- 

C.  M.  Angel  R.  K.  Johnson  Chairman, 

R.  M.  Baldock  W.  G.  Kemmerer  A.  J.  Neff 

Edgar  Bennett  C.  R.  Knowles  E.  H.  Ness 

W.  H.  Bettis  Jack  Largent  C.  H.  Ordas 

G.  E.  Boyd  R.  M.  Leeds  P.  G.  Petri 

C.  R.  Edwards  R.  W.  Marye  T.  M.  Pittman 

G.  J.  Ermentrout  F.  H.  McKenney  W.  D.  Rhoads 

C.  L.  Fero  E.  L.  Mead  F.  H.  Rothe 

J.  G.  Hartley  E.  H.  Mills  J.  C.  Ryan 

C.  E.  Herth  C.  E.  Morgan  R.  R.  Smith 

L.  B.  Holt  C.  H.  Morse  Roy  Wade 

N.  W.  Hutchison  R.  A.  Morrison  F.  F.  Zavatkay 

Committee 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  as  follows  on  its  assignments: 

1.  Revision  of  Manual. 

No    report    except    one    recommendation    for    additional    material    offered    under 
Assignment  2. 

2.  Standardization  of  parts  and  accessories  for  railway  maintenance  motor  cars. 
Progress  report — submitted  as  information— also  ope  plan  recommended  for  inclusion 

in  the  Manual   page  1 74 

3.  Lubrication  of  roadway  machines. 
No  report. 

4.  Self-contained  direct-blow  gasoline  tampers. 
No  report. 

5.  Devices  for  applying  metal  preservative  to  rail  and  track  fastenings. 

Final  report — submitted  as  information    page  177 

6.  Methods  of  keeping  data  on  work  equipment. 

Final  report — submitted  as  information    page  IS.'? 

7.  Pneumatic- tired  tractor  equipment. 

Progress  report — submitted  as  information    page  194 

8.  Impact  wrenches. 

Final  report — submitted  as  information    page  199 

9.  Track  welding  equipment: 

(a)  Oxy-acetylene ; 
No  report. 

(b)  Electric  arc,  collaborating  with  Committee  5 — Track,  and  with  Committee  5, 
Electrical  Section,  Engineering  Division. 

Final  report — submitted  as  information    page  200 

10.  Railway  owned  automotive  equipment. 
No  report. 

11.  Off-track  grading  equipment. 

Final  report — submitted  as  information  page  206 

Bulletin  421,  December,    1940. 

173 


174 Maintenance   of   Way   Work   Equipment 

12.  Weed  burners  and  extinguisher  cars. 
No  report. 

13.  Safety  devices  for  work  equipment,  collaborating  with  Committee  22 — Economics 
of  Railway  Labor,  and  with  Safety  Section,  AAR. 

No  report. 

The  Committee  on  Maintenance  of  Way  Work  Equipment, 

G.  R.  Westcott,  Chairman. 


Report  on  Assignment  2 

Standardization  of  Parts  and  Accessories  for  Railway 
Maintenance  Motor  Cars 

R.  K.  Johnston  (chairman,  subcommittee),  G.  J.  Ermentrout,  C.  L.  Fero,  Jack  Largent, 
R.  A.  Morrison,  E.  H.  Ness,  C.  H.  Ordas,  P.  G.  Petri,  Roy  Wade. 

During  this  year  your  committee  has  given  consideration  to,  and  offers  to  the 
Association : 

1.  Designs  of  receptacle  to  be  mounted  on  motor  cars  for  the  purpose  of  carrying 
fusees  and  torpedoes.  Figures  1,  2,  3  and  4. 

Both  the  design  shown  in  Figures  2  and  3,  and  that  shown  in  Figures  1  and  4, 
make  provision  for  a  first-aid  kit  in  the  same  container.  No  recommendation  is  made  at 
this  time  as  to  the  desirability  of  including  a  first-aid  kit,  nor  as  to  the  number  of  flags, 
fusees,  and  torpedoes  to  be  carried,  as  these  matters  depend  on  the  rules  in  effect  on 
individual  railroads.  For  this  reason  no  dimensions  are  shown,  as  the  size  required  depends 
on  the  amount  and  character  of  material  to  be  carried. 

In  both  designs  the  boxes  will  be  constructed  of  26-gage  to  20-gage  iron  with  welded 
joints  and  a  weather-tight  hinged  lid. 

A  variation  of  design  shown  in  Figures  1  and  4,  provides  space  for  fusees  and  tor- 
pedoes only.  In  connection  with  the  use  of  this  box,  flags  are  carried  in  sections  of 
second-hand  air  hose  fastened  in  a  vertical  position  on  the  front  safety  rail. 

2.  Design  of  safety  rail  for  light  inspection  motor  cars.  Fig.  5. 

A  recommended  design  for  safety  rail  for  section  duty  motor  car  is  now  shown  in 
Fig.  2703  on  page  27-S  of  the  Manual.  The  design  presented  in  Fig.  5  is  submitted  for 
use  on  light  inspection  cars. 

Recommendation 
Fig.  S  is  submitted  for  adoption  and  publication  in  the  Manual.  The  remainder  of 
the   report   is   offered   as  information,   with   the   recommendation   that   the  subject   be 
continued. 


Fig.  1. 


Maintenance    of    Way    Work    E  q  u  i  p  m  e  n  t 


17S 


176 


Maintenance   of   Way   Work   Equipment 


Fig.  4. 


Smallest  Radius  Practical 


Note:- 
No  threaded  parts  to  be  used 
All  railings  to  be  of  same  height 
All  rail  to  be  ^"standard  black 

wrot  steel  pipe. 


Safety  Rails  for  Light  Inspection  Motor  Car. 


Maintenance    of    Way    Work    Equipment 177 

Report  on  Assignment  5 

Devices  for  Applying  Metal  Preservatives  to  Rail  and  Fastenings 

R.  R.  Smith  (chairman,  subcommittee),  Edgar  Bennett,  C.  L.  Fero,  E.  C.  Jackson,  W.  G. 
Kemmerer,  Jack  Largent,  F.  H.  McKenney,  E.  L.  Mead,  A.  J.  Neff,  C.  H.  Ordas. 

In  general,  the  causes  of  corrosion  to  rail  and  track  fastenings  are: 

1.  Refrigerator  car  brine  drippings 

2.  Locomotive  exhaust  gases  combined  with  moisture 

3.  Fumes  from  nearby  manufacturing  plants 

4.  Drippings  from  locomotives  and  coal  cars 

5.  Sea  water  and  sea  air 

6.  Electrolysis 

The  prevention  or  control  of  corrosion  is  achieved  by  the  simple  expedient  of  placing 
a  protective  coating  on  the  surface  of  the  metal.  The  most  commonly  employed  material 
is  an  asphalt  base  oil  usually  containing  45  to  55  percent  asphalt.  Viscosity  or  density  of 
the  oil  is  often  varied  by  the  addition  of  light  solvents  or  by  heating  to  make  it  more 
adaptable  to  the  method  of  application. 

Appliances  for  placing  the  oil  are  divided  into  two  general  classifications;  namely, 
hand  operated  and  power  sprayers. 

Hand  Operated  Appliances 
Hand  operations  may  be  sub-divided  into  the  three  following  groups: 

(a)  Brushing  or  painting 

(b)  Hand  operated  one-man  sprayers 

(c)  Application  of  joint  packing 

(a)  The  method  of  applying  preservatives  by  brushing  or  painting  is  too  readily 
perceived  or  generally  understood  to  require  description. 

(b)  Various  types  of  hand  sprayers  are  available,  but  all  are  basically  the  same. 
In  general,  they  consist  of  a  container  for  the  liquid  to  be  sprayed,  to  which  pneumatic 
pressure  is  applied  by  means  of  a  hand  operated  pump.  Nozzles  of  various  designs,  de- 
pending upon  the  nature  of  the  work  to  be  performed  and  also  upon  the  characteristics 
of  the  material  to  be  sprayed,  are  connected  to  the  tank  with  a  short  hose. 

Nozzles  used  with  hand  sprayers  for  applying  the  preservative  behind  joint  bars  are 
ordinarily  long  metal  tubes,  offset  for  easy  insertion,  and  having  one  or  more  small 
orifices  for  drenching  the  rail  ends  and  back  surfaces  of  the  joint  bars.  The  same  nozzle 
may  be  used  for  coating  the  outside  of  the  joint  or  a  spray  type  may  be  substituted. 
The  latter  will  give  more  uniform  and  more  positive  coverage  with  less  oil  consumption. 
However,  due  to  the  smaller  orifice  in  a  spray  type  nozzle  it  may  be  necessary  to  use  oil 
of  a  lower  viscosity  or  add  kerosene  or  some  other  light  solvent  to  the  material  used 
with  the  tubular  type. 

(c)  It  has  become  the  practice  on  some  roads,  usually  when  laying  rail  or  renewing 
splice  bars,  to  fill  the  void  between  the  bars  and  rail  with  a  plastic  filler  composed  of 
finely  divided  wood  flour,  metal  preservative  oil  and  lubricating  oil.  The  proportion  cur- 
rently used  amounts  to  approximately  2J^  lb.  of  oil  to  1  lb.  of  wood  flour.  The  oil  is  70 
percent  asphalt  base  metal  preservative  and  30  percent  lubricating  oil. 


178 


Maintenance   of   Way   Work   Eq  uipment 


PQ 


m 


K 


Maintenance    of   Way    Work    Equipment 


179 


In  present  practice  the  plastic  filler  is  formed  into  blocks  12  in.  long,  the  cross- 
section  varying  with  the  size  of  the  void  to  be  filled.  The  blocks  are  wrapped  in  wax 
paper,  a  sufficient  number  of  blocks  for  one  joint  being  packed  in  a  carton. 

Application  consists  of  placing  the  blocks  of  plastic  (without  removing  the  wax 
paper)  on  the  back  surfaces  of  the  splice  bars  as  they  lie  face  downward  at  their  point 
of  application  to  the  rail.  The  splice  bars  are  then  revolved  quickly  into  place.  The 
action  of  bolt  tightening  or  pulling  the  bars  into  position  causes  the  plastic  to  be  squeezed 
or  forced  into  all  parts  of  the  void. 


Fig.  3. — Lever  For  Applying  Splice  Bars  Over  Plastic  Blocks. 


With  rail  sections  having  large  void  areas  between  the  splice  bars  and  the  rail  and 
requiring  correspondingly  heavier  plastic  blocks,  it  is  often  difficult  or  impossible  to 
force  the  splice  bars  far  enough  into  position  by  hand  to  apply  the  nut  to  the  track 
bolts.  Hooks  or  levers  for  pulling  the  bars  into  position  for  bolt  application  have  been 
devised  by  some  roads.  A  typical  device  for  this  purpose  is  shown  in  Fig.  3. 


Power  Operated  Sprayers 

For  an  extensive  oiling  program  power  operated  sprayers  are  advisable.  This  type  of 
equipment  employs  mechanically  operated  pumps  for  forcing  the  preservative  through 
spray  nozzles  under  high  pressure. 


180 Maintenance    of   Way   Work    Equipment 

The  equipment  used  falls  into  three  general  classifications: 

(a)  Small  power  sprayers  hauled  by  motor  cars 

(b)  Gasoline  powered  self  propelled  units 

(c)  Large  spray  cars  handled  by  work  train 

(a)  One  railroad  has  developed  a  small  car,  hauled  by  a  track  motor  car,  primarily 
designed  for  automatically  spraying  the  external  surfaces  of  rail  joints. 

The  unit,  about  the  size  of  a  regular  track  push  car,  carries  two  standard  5S-gal. 
drums  of  preservative,  together  with  a  single  cylinder  air-cooled  gasohne  engine  driving 
a  small  centrifugal  pump  for  applying  the  preservative  under  approximately  70  lb.  pres- 
sure. Before  spraying  operations  begin,  the  oil  is  heated  by  pumping  it  through  a 
manifold  surrounding  the  motor  exhaust  line.  Oil  enters  the  manifold  at  the  engine  end, 
passes  along  the  exhaust  line  for  a  distance  of  about  four  feet  and  is  discharged  back 
into  the  drum.  Approximately  IS  to  20  min.  are  required  to  adequately  heat  a  SS-gal. 
drum  of  preservative. 

During  spraying  operations  valves  controlling  the  flow  of  oil  to  the  spray  nozzles 
are  automatically  opened  as  "kick  rods"  come  in  contact  with  the  splice  bars  and  close 
as  soon  as  the  contact  is  released.  The  machine  is  equipped  with  an  arrangement  to 
by-pass  the  oil  back  into  the  drum  when  spray  valves  are  closed. 

Obviously,  it  is  feasible  to  use  the  unit  for  continuous  spraying  by  simply  removing 
the  devices  used  for  automatically  opening  and  closing  the  valve  in  the  supply  line,  or 
by  arranging  to  hold  the  valves  open  for  as  long  a  period  as  desired. 

(b)  There  is  available  through  a  manufacturer  a  self-propelled  track  oiler  of  rather 
large  capacity  designed  to  accomplish  all  of  the  oiling  on  track  or  roadway.  The  machine 
consisting  of  two  units,  the  track  oiler  and  the  trailer  tank  car,  is  powered  with  a  72-hp. 
gasohne  motor  for  propulsion  and  the  operation  of  all  the  mechanical  equipment,  such 
as  air  pump,  oil  pumps,  etc. 

This  appliance  will  automatically  oil  rail  joints  at  a  speed  of  8  to  12  miles  per  hour, 
the  entire  rail  and  the  fastenings  at  from  IS  to  20  miles  per  hour  and  the  roadbed  at  a 
rate  of  6  to  8  miles  per  hour.  The  spray  car  is  equipped  with  two  auxiliary  hand  spray 
lines  for  use  in  oiling  switches,  frogs  and  other  appurtenances  within  2S  ft.  of  the  machine. 

The  oil  is  heated  by  the  motor  exhaust  in  the  course  of  its  flow  from  the  supply 
tanks  to  the  spray  nozzles  and  is  applied  to  the  track  under  high  pressure.  The  oiler  and 
trailer  tank  have  a  total  capacity  of  approximately  3,000  gal.,  and  this  supply  can  be 
replenished  from  railway  tank  cars  by  means  of  a  power-operated  pump  in  about  30  min. 

(c)  For  extensive  track  oiling  some  roads  have  developed  large  spray  cars  designed 
exclusively  for  train  operation.  These  consist  essentially  of  a  box  car  in  which  there  is 
mounted  a  rotary  pump  having  a  capacity  of  200  gal.  per  min.,  with  a  4-in.  intake  and 
a  3-in.  discharge,  driven  by  a  20-hp.  gasoline  engine.  The  car  is  piped  to  permit  pumping 
oil  direct  from  the  tank  cars  in  which  it  is  received  through  a  flexible  hose  suction  line 
between  the  oil  car  and  the  tank  car.  On  the  suction  side  of  the  pump  there  is  a  valve 
by  which  the  intake  of  oil  can  be  controlled  so  as  to  maintain  a  fixed  pressure  of  about 
45  lb.  in  the  discharge  line.  There  is  also  a  strainer  installed  in  the  suction  line  to  prevent 
anything  from  getting  into  the  pump  that  might  injure  or  clog  it.  Both  pump  and 
strainer  are  steam  jacketed. 

The  discharge  line  from  the  pump  delivers  the  oil  to  oihng  heads  at  the  end  of  the 
car.  There  is  an  oiling  head  over  each  rail,  each  head  having  spray  nozzles  on  each  side 
of  the  rail  so  arranged  that  they  can  be  adjusted  to  fit  the  rail  and  fastenings  to  be  oiled. 
The  spray  nozzles  for  one  rail  are  mounted  on  the  body  of  a  quick-acting  valve,  the 
stem  of  which  is  secured  in  a  fixed  position  on  the  bracket  supporting  the  oiling  head. 
By  means  of  a  lever  just  inside  the  car,  both  oiling  heads  at  that  end  of  the  car  can  be 


Maintenance   of   Way    Work   Equipment 


181 


Fig.  4. — Rail  Joint  Spray  Car — Nozzle  in  Spraying  Position. 


Fig.  S.— Self-1'iopelled  Rail  Oiling  Car. 


182 


Maintenance   of   Way   Work   Equipment 


Fig.  6. — Train-Operated  Rail  Oiling  Car. 


raised  so  that  the  spray  nozzles,  which  in  operation  extend  somewhat  below  the  top  of 
the  rail,  will  clear  such  obstructions  as  crossing  plank  or  turnout  rails.  When  the  heads, 
including  the  valve  bodies,  are  so  raised  against  the  fixed  position  of  the  stems,  the 
valves  are  automatically  closed. 

As  the  flow  of  oil  is  cut  off  in  this  way,  it  is  necessary  to  have  a  relief  by-pass  at 
the  pump.  Other  accessories  at  the  pump  are  a  pressure  gage  in  the  discharge  line  to 
facilitate  the  maintenance  of  the  desired  pressure,  and  a  thermometer  to  indicate  the 
temperature  of  the  oil. 

The  steam  piping  in  the  car  supplies  steam  for  maintaining  proper  temperature  at 
the  pump  and  strainer,  and  is  arranged  also  for  blowing  out  the  discharge  lines  and 
oiling  heads  with  steam  at  the  end  of  the  run.  It  is  desirable  to  apply  the  oil  at  a 
temperature  of  about  175  deg.  F.  To  this  end,  oil  must  be  received  in  tank  cars  having 
steam  heating  coils  in  good  condition. 

In  use,  the  oiling  car  is  pushed  ahead  of  the  work  train,  with  the  oiling  end  for- 
ward. This  permits  the  operator  to  see  obstructions  requiring  the  oiling  heads  to  be 
raised.  The  consist  of  the  train  back  of  the  oiling  car  includes  one  or  two  tanks  of  oil 
under  heat,  an  engine  with  steam  connection  on  the  front  end,  other  tank  cars  of  oil,  if 
any,  and  finally,  the  caboose.  In  operation,  a  considerable  amount  of  oil  vapor  will 
collect  on  the  oiling  car  and  other  equipment  in  the  train  and  finally  on  the  rails.  It  is 
necessary,  therefore,  that  the  oiling  car  be  equipped  with  sanders  in  good  condition  and 
sand  hoppers  of  100  to  200-cu.  ft.  capacity. 

The  car  is  operated  at  about  20  miles  per  hour,  and  at  this  speed  it  is  not  prac- 
ticable to  stop  to  oil  switches  and  frogs,  and  turnout  rails  and  fixtures. 


Maintenance    of    Way    Work    Equipment  183 

Several  roads  have  used  equipment  as  described  above  very  successfully,  although 
work-train  service  is  required ;  the  work  is  done  with  such  speed  that  the  total  cost  is 
comparatively  low,  often  running  less  than  $3  per  mile.  It  has  the  additional  advantage 
that  the  oil  is  applied  hot  and  therefore  penetrates  the  rust  and  seals  better  than  cold  oil. 
Also,  as  the  oil  is  taken  directly  from  the  tank  car,  there  is  no  loss  of  time  transferring 
the  load,  as  is  the  case  of  rail  oilers  having  a  tank  built  into  the  car.  In  operation,  only 
two  men,  other  than  the  train  crew,  are  required,  namely,  the  operator,  who  is  stationed 
at  the  oiling  end  and  raises  the  oiUng  heads  when  necessary,  and  a  helper  who  sees  that 
the  pump  is  operating  properly  and  that  pressure  and  temperature  are  correct. 

Tie-tamping  air  compressors  equipped  with  hose  and  spray  nozzles  are  often  used 
for  spraying  facilities  that  are  either  too  extensive  to  be  sprayed  economically  with  hand 
operated  appliances,  or  consume  too  much  time  to  be  economically  handled  with  train 
operated  spray  cars.  Typical  of  such  facilities  are  turnouts  and  crossovers  at  interlocking 
plants. 

When  using  compressed  air  a  vacuum  type  nozzle  may  be  employed.  A  vacuum 
nozzle  using  a  relatively  large  volume  of  air  has  the  advantage  of  blowing  the  metal 
free  of  dirt  and  scale  as  well  as  coating  it  with  preservative.  However,  its  disadvantage 
lies  in  the  fact  that  a  short  suction  hose  must  be  used  and  consequently  the  oil  container 
must  be  frequently  moved  as  the  work  progresses. 

Direct  pneumatic  pressure  may  be  applied  to  the  preservative  oil  container  and  an 
ordinary  spray  nozzle  used  in  place  of  the  vacuum  type.  By  using  this  method  it  is 
possible  to  force  the  oil  a  considerable  distance  and  thus  it  is  feasible  to  mount  the 
container  on  the  compressor  and  obtain  the  advantage  of  heating  the  preservative  with 
the  motor  exhaust. 

The  intent  of  this  report  as  defined  by  its  title  is  solely  to  describe  devices  used  or 
available  for  applying  metal  preservatives  to  rail  and  fastenings.  Therefore,  the  economic 
value  of  any  device  or  method  has  not  been  discussed. 

Your  committee  presents  this  report  as  information  and  recommends  that  the  subject 
be  discontinued. 


Report  on  Assignment  6 
Methods  of  Keeping  Data  on  Work  Equipment 

N.  W.  Hutchison   (chairman,  subcommittee),  C.  R.  Edwards,  G.  J.  Ermentrout,  C.  E. 
Herth,  W.  G.  Kemmerer,  R.  W.  Marye,  E.  L.  Mead,  C.  H.  Morse. 

Every  railroad  that  invests  in  work  equipment  expects  at  least  a  normal  return  on 
the  money  invested;  otherwise  it  would  be  illogical  to  make  the  expenditure.  The  ulti- 
mate objective,  however,  is  to  secure  the  maximum  return,  which  can  only  be  determined 
where  reliable  data  are  available  relative  to  the  operating  and  financial  costs  of  the  work 
equipment  purchased. 

Although  data  relative  to  the  ownership,  operation,  and  maintenance  of  work 
equipment  are  not  vitally  essential,  they  are  highly  desirable  for  the  following  purposes: 

1.  To  determine  the  rate  of  return  on  the  investment 

2.  To  compare  the  cost  of  machine  work  with  work  done  manually  or  by  other 
machines 

3.  To   permit   proper   coordination   of   work   programs   with   the   work   equipment 
schedule 

4.  To  forecast  maintenance  allowances  necessary  for  machine  work 


184 Maintenance    of   Way    Work   Equipment 

5.  To  control,  within  limits,  the  operating  and  repair  costs  of  work  equipment 

6.  To  provide  information  promptly  regarding  the  location  and  condition  of  each 
machine 

7.  To  permit  intelligent  supervision  of  work  equipment 

8.  To  provide  a  basis  on  which  to  predicate  future  purchases  of  similar  equipment 

Data  of  any  description  are  valueless  unless  accurate,  and  their  collection  should  be 
effectively  supervised.  Too  much  detail  adds  "paper  work"  to  the  duties  of  the  foremen 
and  machine  operators  and  defeats  its  own  purpose.  In  specific  cases  test  data  only  may 
be  sufficient,  but  where  complete  operating  and  repair  costs  are  desirable,  data  should  be 
collected  and  recorded  for  the  entire  life  of  a  unit  of  equipment. 

To  your  committee  was  assigned  the  task  of  studying  various  methods  of  keeping 
data  on  work  equipment.  Studies  conducted  clearly  indicate  that  there  are  not  now,  nor 
can  there  be,  from  a  practical  standpoint,  standardized  methods  of  keeping  such  data. 
However,  standardization  of  forms  for  the  purpose  is  considered  practical  and  desirable, 
which  forms  can  be  utilized  as  necessary.  Your  committee  has,  therefore,  designed  forms 
for  collecting  and  recording  work  equipment  data,  which  represent  a  cross-section  of  the 
forms  in  use  on  various  railroads  that  have  heavy  investments  in  work  equipment. 

The  forms,  shown  on  following  pages  with  illustrative  data,  are  classified  and  used 
as  follows: 

1.  Ownership,  Location  and  Condition 

Form  A — Report  of  Inspection  of  New  Work  Equipment 

Upon  receipt  of  a  new  unit  of  work  equipment  it  should  be  inspected  for 
visible  defects,  the  data  inserted  on  Form  A  and  the  form  forwarded  to  the 
supervisor  of  work  equipment,  who  shall  assign  a  railroad  number  to  the 
equipment. 

Form  B-1 — Record  of  Work  Equipment 

Data  for  the  upper  portion  of  this  form  are  taken  from  Form  A,  from  in- 
voices and  from  other  available  sources,  and  when  inserted  on  the  form, 
serve  as  a  permanent  record.  The  form  should  be  made  of  stiff  cardboard  and 
kept  in  a  file  drawer,  grouped  with  cards  for  other  equipment  of  the  same  type. 
Data  for  the  lower  half  of  this  form  are  supplied  by  Form  C. 

Form  C — Report  of  Transfers  of  Work  Equipment 

This  form  should  be  filled  out  and  forwarded  to  the  supervisor  of  work 
equipment  each  time  a  machine  is  transferred  to  or  from  a  division. 

Form  D — Report  of  Failure  of  Work  Equipment 

This  form  should  be  submitted  to  the  division  engineer  immediately,  when  a 
unit  of  work  equipment  breaks  down. 

Form  E — Work  Equipment  Inspection  Report 

This  form  should  be  forwarded  to  the  supervisor  of  work  equipment  imme- 
diately following  a  regular  or  emergency  inspection  of  any  unit  of  work 
equipment. 

Form  F — Report  of  Location  of  Work  Equipment 

These  data  should  be  submitted  to  the  supervisor  of  work  equipment  peri- 
odically by  the  division  engineer  covering  all  equipment  on  his  territory. 

Form  G— Report  of  Work  Equipment  Used  for  AFE  Work 

Data  on  this  form  should  be  forwarded  at  the  end  of  each  month  or  at  the 
conclusion  of  an  AFE  project  to  the  supervisor  of  work  equipment  by  the 
engineer  or  foreman  in  charge  of  the  work. 

Text  continued  on  page  194 


M  a  intena  n  c  e    of   W  ay   Work   Equipment 


185 


The  North   and  South  Railroad 
Report  of  Inspection  of  New  Work  Equipment 


item  of  equipment 

Manufacturer     /S^-..^  ^^  ^ 


C4}M<jl^  ^^-t^^-^^V 


TYPE-<^i^^^j:^ Model. 

manufacturer  of  boiler 

Size  of  boiler 


Size. 


_  mfrs.  serial  no.. 

7X&  WnCHT 

Boiler   no 


ii^ezz 


Manufacturer  of  engine  or  motor 

Engine  or  motor  serial  no.  -^z^-  /439z 

model   of   engine   or  motor    /2-/&-Ai^^ 

No.  OF  CYLiNDERS__£_^_ Cycles 

Amps K.v.A.  Rating 

Other  information 


KIND  OF  boiler. 


A 


.SIZE    OF    engine    OR    MOTOR- 

-Type  of  engine  or  motor. 

: R.P.M.         &50         volts 


h.p. 


Capacity. 


Date  inspected. 


.CONDITION     WHEN    INSPECTED 


List  below  defects  if  any: 


ASSIGNED    to      jZ"^  -^^   ^*.ti^  -gU^^^ pyj   in    SERVICE   ON      -^"-^   ^ 19  = 

AT_-:SL^L££2 R.R.  NUMBER    ASSIGNED AC-/ZS 


~^  NAME  a    TITLE 


FORM    A— SIZE   e'/,Xir 


186 


Maintenance    of   Way   Work   Equipment 


a' 

'^ 

^ 

V 

Z 

"^l 

* 

V 

*^ 

C 

o 

^ 

z 

en 

X 

o 

Z 

\ 

!5 

o 

bJ 

< 

bJ 

'J 

V 

nr 

U 

a: 

"^ 

2 

a 

u 

^^ 

a 

X 

< 
> 

UJ 

< 
-1 

o. 

O 

CE 

^ 

W 

bJ 

z 

bJ 

CC 

(r 

O 

IE 
bJ 

O; 

oc 

>- 

U 

2 

r 

O 

'    z 

> 

bi        r, 

z 

- 
O 

m 

O 

a 

bJ 

c 

bJ 

bJ 

< 
a 

o 

i 

u 
u. 

UJ       °- 
1-       (T 

en 

UJ 

1/1 

< 
z 

bJ 

»- 
4 

o 

u 

« 

< 

a. 

o 

1- 

< 
o 
a. 

_j 

Z 

Z 
< 

z 

Ul 

Q 

< 

H 

»- 

X 
(9 
li 

a 
111 
z 
o 

s   § 

X    ^^ 

Q 

1 

^ 

<n 

UI 

c 

UJ 

0. 

bl 
Ol 

>■ 
1- 

K 

UJ 

_J 

< 

2 

* 

X       ^ 

^ 

2 
< 

o 

(!) 

z 
o 

1- 
3 

o 
UJ 

^ 

bJ 
O 
O 

2 

s 

IE 
b. 

o 

^ 

UJ   ; 

■i 

</) 

bJ 

{/) 

cr 
o 

O 

O 
OC 

^ 

S   iJ 

!: 

b. 



o 
z 
< 

X 

-3 

K 
u 

N 

0. 
0. 

a. 

o 

z 

o 

> 

Z 
< 
K 

1- 

z 
o 
en 

1 
1 
1 

o 

Z 

tu 

O 
O 
UJ 

1 

(0 

« 

o 

-    _1 
< 

bJ 

</ 

(£ 

UJ 

a 

z 

O 

z 

a: 

1^ 

< 
bJ 

cr. 

i 

■ 

I 

i 

UJ 

o      "' 

~ 

_i 

t 

\- 

e 

3   1 

■<     o 

3 

bJ 

z 
o 

in    «5 

o 
u. 
o 

o 

m 

«; 

4 

^ 

UJ 

Sv 

Os 

lU 

K 
=> 
1- 

Kj 

b.     a. 

O      bi 

< 

^ 

6 

z 

< 
a 

^ 
1 

J 

O 

< 
ti. 

o    o 

!i 

z 
< 
2 

J 
bJ 
O 

z 

o 

i 

>*• 

1 

i 
•1 

1^ 

O 

i 

^ 

^ 

o 

1- 
o 

2 

UJ 

_i 
o 
>- 
o 

z 
o 

o 

J 

Si 

M 

4 

UJ 
b. 

O 

bJ 

< 

^1 

O 

Z 

.^ 

0.       bJ 

^     o     <n 

0. 

o      ^ 

le   b. 

X 

_j 
o 
m 

b. 
O 

(E 
O 

b. 

Z 

a 
o 

IE 
b. 

J 

1 

s 

< 

bJ 

■      c 

b.        bl 

?  bJ 

bJ 

IE 
bl 

'^ 

\ 

E 

a. 

-1       » 

K        iC 

UJ 

^ 

X 

^ 

liJ 

V 

bJ       o 

(0       < 

N 

< 

1- 

v^^^ 

H 

<n 

1- 

M    a. 

U     2 

Vi 

2 

O 

^   ^ 

'  1 

Maintenance    of    Way    Work    Equipment 


187 


The  North  and  South  Railroad 
Report  of  Transfers   of  Work  Equipment 


ITEM  of 

EQUIPMENT 


R.R 
NO 


MFRS. 
SERNO 


ENG. 
NO. 


RECEIVED 
FROM 


DATE 
RECD. 


SHIPPED 
TO 


DATE 
SHIPPED 


^X^  J^.-y.-y  (^^nt*a^- 


4/^-/i}K 


.^VAj^-g/ui^   tiXC^ 


///Z?/?f 


Purpose  of  tramsffw   .^a«^/4>~- ^z^^a^^"^^  "'»*'^ 

AUTHORITY    FOR    Tbansffb   Ji.^.^^'^^^c^  y  ^O-^fU^...^  y  zh.^  ^^..^^.,,^,^ 
SIGNED^ TITLE         '^^^   -^V" 


FORM  c-sizE  eikxn 


The  North  and  South  Railroad 
Report  of  Failure  of  Work  Equipment 

D*TF     S/m/3?         I  OCATIQM        ^&'^f4^ DATE  a    TIME  FAILED  •^^^-  7-^^-''^ 

ITEM  OF  pqiiipufmt    -^  :^a...^^^  <a..y<^^..M^ PR  Mft    ac-^^s 


Cause  of  failure      ■'^'^-^^  ^^-^^  /^^^-^ 


Estimated  time  Will  Be  out  of  Service. 


^  /'ti-fc^-4.-*' 


action  Taken  to  Return  it  to  Service •^"-*"'^-^^  -121; 


if  now  back  in  Service  show  day  a  Hour  returned  to  service -f,^^--^^/'^ 

SIGNED  7 -^^^-y  ^^-^  ^W^-^ 


Operator  or  mechanic 


form  d-  Size  9X6 


188 


Maintenance    of   Way   Work   Equipment 


z 

Ul 

^ 

O 

K 

ffi 

^ 

^ 

1 

Ul 
0 

z 

K 
O 

o 

\ 

^ 

4 

z 

(k 

o 

a. 

o:   ^ 

2; 

O 

u    i 

Z 

»  i 

oc 

^ 

o 

K 

3 

.u 

^ 

8 

u 

2 

c 

I 

UJ 

z 
o 

z 

1 

UJ 

O 

o 

o 
o 

\ 

\ 

\ 

\ 

t- 

UJ 

*      < 

^""^ 

^^~ 

~^^ 

"^~ 

< 
o 

o 

0. 

Si 

z 
o 

0)   U 

< 

X 

Ul 

h-    0-    < 

dC 

_l 

q: 

s 

O    Ul    _J 

o 

< 
or 

z 

« 

ul   _l 

g;5  - 

o 

Ul 

i 

5 

■n: 

UJ 

a. 

o 

4 

z  m  o 

t- 
o 

I 

l- 

v>  it  "^ 

z 

i 

o 

O 

o 
bJ 
0. 

<n 

z 

UJ 

< 

O 

DC 

Ul 

a 

2 
3 

is 

> 

UJ 

< 

z 
o 

o 

r 

1 

a 

z 

a. 

a 

Ul 

z. 
o 

i 

z 

K 

H 

o 

€ 

< 

Z 

_l 

(n 

fj 

I 

UJ 

2 

K    UJ    -^ 

Ul 

a. 

o 
z 

^ 

1- 

a. 

3 
O 

Ul 

^5^^ 

z 

< 

t 

O 

z 

«0    U,<4 

Ul 

z 
I 

2 

bj 

X 
►- 

o 

Ul 

< 

2 

a 

> 

5^ 

u 

< 
2 

u. 
O 

K 
O 

-» 
4 

2 

*5 

s 

3     N 

0) 

-1 

f 

2^ 

-1 
< 

V 

4 

t 
« 

V 

1 

Ul 

z    O 

O     UJ 

Z    X 

< 

a. 

u. 
o 

Ul 

o 
< 
2 

UJ 

1 

1 

H 

1 

K 
Ul 
O 

Ui    «> 

=  b. 
2   1- 

ffi 

z 

^ 

i 

t-  -* 

z 

2  "  >    <n 

_,    to    UJ     ^ 

o 
o 

Ul 

a. 
<o 

z 

s 

O 

^^ 

^. 

UJ 

a.   * 

=     UJ 
LJ    if 

*-     < 

o  2 

E  SERIAL  Nl 
OF  FUEL  U 

of  last  pr 
Radiator  L 

z 
o 

m 

Ul 

z 
o 

ul 

1- 
cn 
>- 
V) 

z 

z 
o 

o 

z 

LJ 

C 

o 
en 
in 

Ul 

c 

a  1 

—     ^    E    UJ    UJ     Ul 

0. 

s 
o 

Z 

3 
o 
o 

a: 
m 

3 

0. 

2 
o 

n  z  UJ  1-  o  o 

o 

o 

o 

-J 

o 

a  £ 

Maintenance    of    Way    Work    E  q  u  i  p  m  e  n  t 


189 


m 

"1 

f" 

1L 

'^1 

< 

ffi 

Z 
UJ 

a: 

^ 

V 

2 

^ 

_|Z 

<  o 

£E 

z  o 

1 

a 

UJ 

2 

:i 

1 

< 
o 
a: 

Q. 

3 

o 

z 

UJ  z 

o 

'^ 

a: 

Ul 
bJ 

_i 

O 

z 

< 

a: 

o 

z 

UJ 

o: 

• 

I 
1- 

o 

^ 

o     . 
<   O  Ul 

o 

3 
O 
01 

Li. 

o 

^ 

o:  z  _i 
o  2  o 
•"  a:  — 

<rt  Ok 

-3 

J 

in 

> 

z 

z 
o 

o 
u. 

^*° 

'-"• 

^. 

< 

K 

I 

o 

1- 

o 

(C 

_l 

o 

Z 

u. 
o 

z 
o 

LU 

t- 

I 

oc 

l- 

o 

a. 

UJ 

o 
o 

_l 

1 

] 

«i 

a:.© 

(TZ 

'\ 

V 

1- 

^ 

z 

^ 

UJ 

z 

, 

^~ 

a. 

; 

3 

>l 

O 

UJ 

u. 
o 

r 

z 
o 

z 

UJ 

t- 

1 
1 

o 

m 

^ 

M 

, 

' 

o 

^^i 

■^ 

Ov 

■" 

tn 

0> 

(A 

'^^ 

^ 

< 

4 

2 

Ul 

1^ 

o 

r 

^ 

!« 

(r 

o 

o 

z 

UJ 

1 

III 

o 
o 

5 

^ 

i 

< 

< 

Ul 

a. 

v^ 

o 

ac 

o 

f 

_l 

o 

t^ 

< 

U. 

> 

a: 

I 

UJ 

w 

=3 

t  o2 

O  Oo 

o  ir!ij 

Z  Ul  -C 

\ 

o 

3 
O 

t- 
z 

ujaii 

z 
o 

C/) 

UJ 

Crt 

O 

Z 

z 
< 

o 

u. 

X 

UJ 

o 

O 

a: 
o 

.[ 

z  2  o 
z  a=¥ 

.<J 

Z 

^ 

^ 

Ui 

T 

u. 
o 

» 

00 

1- 

o 

Q. 
UJ 

1 

o  ^g 
6  oi" 

^ 

<) 

^ 

1 

ZX3 

fe  coo 

O  >.  UJ 

6  <  f 

5 

•^6 

^ 

f 

15^ 

*\ 

tr  6 

S 

. 

4 

orz 

H 

o 

z 

Ul 

Z 

1 

$ 

3 

u. 

O 

o 

UJ 

\ 

] 

z 
o 

u. 
O 

H 

a 

r 

Ul 

o 

_J 

H 

i 

190  Maintenance    of    Way    Work    Equipment 


The  North  and  South  Railroad 
Recommendation  for  Retirement  of  Work  Equipment 

ITEM  OF  EQUIPMENT ^«^  ^^^^ RRNO.    ^^"^^^      DATE    ^^  "^      \9.Ef- 

UkttitPAr.TuttPP       <^.^>>.^A^   <g>y Mfrs.  serial  NO.^ 


MAKE  OF  Fmci'hp        /^w<^  ^C^^  A ENGINE  N0.-Z£££££_B0ILER  NO.. 


THIS   MACHINE    WAS    RECEIVED  f>M       ^^  ^  \9>^    FROM      7C^  ^--^  DiviaiOM 

FOR    REPAIRS,   COVERED    BY    REQUISITION    NUMBER -Zl^f£2£_lT  IS  ESTIMATED  THAT    THE 

REPAIRS    WILL  COSTjlfflff IF  DISMANTLED.  IT  IS  ESTIMATED  THAT    THE    CHARGE 

FOR    DISMANTLING   WILL  BeJL£1££ ^ThE  VALUE   OF   THE    SECOND    HAND   PARTS 

Will  BEiliLf£_  and  the  value  of  the  Scrap  Parts  Will  be  *  'cc<, 


SHOP  Supr J/  ^i^3<*<^ 


THIS  machine   was    Purchasfp    J-^  "^  19  z^ ON  A.F.E.  NUMBER  _^f£±lf__. 

Requisition  Number _£_f^___  at  a  cost  of_£!^££ 

DURING   THE_ZL_YEARS    IT    HAS    BEEN    IN    SERVICE    IT   WAS     USED    FOR    AN    AVERAGE  OF 
//y    n^v^  PER  YEAR.-5_H0URS   PER   DAY,    AT     A    TOTAL    OPERATING     COST    TO     DATE 


OP  tiz4^sAtz    itir.i  iiniMB  Fuel.  Lubrication,  and  Repairs. 

REMARKS 


It  is  My  Recommendation   That  this  machine    BE_^f±i£. 


supervisor  of  work  Equipment. 


a  /^  5i«-, 


form  H-SIZE   8)^X11 


Maintenance   of   Way   Wo rk   Equipment 


19! 


The  North   and   South   Railroad 
Daily  Report  of  Operation  of  Work.  Equipment 


DivisiON_*ii^iri£i. 


<;iiR-nivN    gt^'-'g^        hatf  V7  i9^rr  machine  NO._£^ii££_ 


KIND  OF  Utr.HiMF   S^  ^"t^^  "^ KINO  OF  WORK     -^"y-f 


Machine  working _«_hrs.:££Mins;Idle_^^HRs.z£Mins. Reason  idle. 


..2\.f^C,^     ^jlJmyif 


.  Programmed '^!^£_ 


A.  DELAYS 

weather, 
traffic  _ 
Repairs - 
MovlN6_ 
Other. 


Total  Delays. 


Number  of  Tools  with  OuTFiT_fi_ 


B.  Production 

LOCATION 

working    /izc   FFFT   E.W.N.  OR  S.  OF    MP    i^fZ 
WORKING  ON  TRACK    Na 


Working  Between  Tracks  No and. 

WORKING  Border  along  track  no. 


Capacity  of  UNiT_£ilr±_ 


Work  in  detail 


Quantity 


Units 


Work  in  detail 


Quantity 


Units 


C.  Labor  (exclusive  of  repairs) 


Repairs 


NO.  I       Time  Total 

Occupation  Rate  men  str.|Pro.|Pun.earneo 


OCCUPATION 


Rate 


No. 

MEN 


TIME 


STR  PRO. 


Pun 


TOTAL 
EARNED 


tC^iU^A^^^ 


D.  Work  Train  (Move  a  service  equipment) 


TRAIN 

foreman 
Laborers 

Other 


.Hours  »» per  hr.  ■ 


zz^  Z- 


truck         

Time  Called. 


.Time  Released. 


.  Supplies 

2Z.6ALS.  Gas  (?«_^:g_PER  Gal.-»_ 

.^^.Qts.  Oil  €'»_£2_Per  Qt.  ■•_ 

.jLLbs.  Grease  <?»_££. per  lb.  ••_ 

lbs.  Grease  ®« "  "  «». 

GALS.  Fuel  Oil®  » per  gal.  =«. 

Tons  Coal    «> » per  ton  »«. 

«8 Per    =•. 

^» PER     »». 


F  REPAIR  PARTS 


PIECES 


DESCRIPTION  OF  PART  CAT  NO  COST 


-^ 


^e 


G.  SUMMARY  OF   OPERATING    COST 
ITEM  C- LABOR    OPERATING 

"     "-LABOR  Repairs 
Item  d-work  train 
ITEM  E- Supplies 

ITEM  F- REPAIR    PARTS 
TOTAL  COST   OF    OPERATION 


CONDITION    OF  THE    MACHINE  AT   THE   CLOSE    OF   THE    DAY'S    WORK. 
DATE    REPAIR    PARTS   ORDERED 19 

MACHINE   FORWARDED    TO    SUPERVISOR AT 


^#^«^ 


MACHINE    RECEIVED    BY    SUPERVISOR. 
REMARKS * 


.DATE. 


.DATE. 


.I9_ 
.19- 


SIGNED    .^"^^ 


NAME    a   TITLE 


FORM  I -SIZE  eW'xir 


192 


Maintenance    of    Way    Work    Equipment 


. 

_.,,. 

m 

« 

oe 

K 

< 

< 

Z 

b, 

>- 

(E 

J 

u  in  0) 

5, 

-  &  ^ 

S 

\ 

t- 
Z 

o 
Z 

1^=^ 

> 

fl 

^ 

1 

^ 

t- 
z 

1-  ° 

^    UJ 

z  or> 

UJ 

3  3 

UJ 

2 

H 

z 

3 

ai 

z 

UJ 

< 
o 

UJ 

2 

ii 

5 

\ 

z 
o 

> 

, 

O 

o 

< 

a: 

VI 

I 

O 

Z 

o 

z  (ri 

v^ 

o 

2X 

(0 

!5 

c 

lij 

^ 

z 

a. 

< 

O 

§ 

J 

X 

b. 

^ 

1- 

O 

o 

t 

o 

o 
z 

i 

Z 

O 

a. 

^ 

^^ 

X 

cr 

;  eo  > 

J- 

O  -I  Js 

> 

Vl 

X 

f  %^ 

^■ 

1- 

W   Z 

\ 

z 
o 

e_. 

, 

s 

£5 

'^ 

<n  o  u 

^S5 

$: 

oo  -J 

§i| 

w 

►^  "*  9 

& 

1 

o  c  i)j 

a:  6 

•J 

^^ 

kz 

5. 

] 

4 

>, 

X 

o 

< 

i 

1 

z 

ii. 

t 

c 

"1 

« 

iij 

^\ 

> 

s 

>■ 

^ 

>- 

1 

3  o»> 

UJ  zte 

SJ 

^ 

<n 

I     o: 

CO 

-1 
< 

3 

V 

^ 

< 

1 

N 

< 

^ 

u. 
o 

a: 

UJ 

o 

0) 

2 

^ 

z 

o 

h- 

o 

~y 

z 

tu 

llJ 

2 

o 

i 

^ 

3 

o 

< 
1 

1{^ 

^4 

^ 

< 
o 

O 

UJ 

V 

K 
UJ 

a: 

UJ 

_i 

K 

^ 

z 

< 

O 

•) 

tt 

^ 

ffi 

J 

UJ 

X 

^ 

z 

1- 

o 

o 

><• 

3 
O 

H 

oe 
o 

< 
2 

at 

> 

cn 

V) 

CO 

1 

O 

a 

< 

< 

z 
< 

D. 

UJ 

rr 

UJ 

IT 

i- 

^ 

X 

~^ 

a 
o 

Z 

a 

bJ 

til 

^s 

Hi 

X 

b. 
O 

^1 

g2 

V- 

a. 

o 

Q. 

£^ 

UJ 

<  UJ 

ir 

Ul  4 

."5 

V 

KZ 

.V 

•<. 

\ 

o:© 

V 

q:z 

?^ 

1 

^ 

> 

z 

UJ 

4 

o. 
o 

UJ 

1 

z 
o 

u. 
o 

z 

r 

1 

> 

UJ 

\ 

Maintenance    of   Way    Work   Eg  u  i  p  m  e  n  t 


193 


194 Maintenance   of   Way    Work   Equipment 

Form  H — Recommendation  for  Retirement  of  Work  Equipment 

Following  a  complete  inspection  by  the  shop  superintendent  or  road  mechanic, 
this  form  should  be  forwarded  to  the  supervisor  of  work  equipment  who  sup- 
plies additional  information  with  his  recommendation  and  forwards  the  com- 
pleted form  to  his  superior. 

2.  Cost  of  Operating  and  Maintaining  Work  Equipment 

Form   I — Daily  Report  of  Operation  of  Work  Equipment 

This  form  should  be  forwarded  daily  by  the  machine  operator  or  foreman  to 
the  supervisor  of  work  equipment,  with  a  copy  to  the  supervisor  of  track  and 
the  division  engineer. 

Form  J — Monthly  Report  of  Operation  of  Work  Equipment 

This  form  should  be  prepared  monthly  by  the  division  engineer,  from  data 
supplied  on  Form  I  and  forwarded  to  the  supervisor  of  work  equipment. 

Form  K — Report  of  Field  Repairs  to  Work  Equipment 

Data  on  this  form  should  be  supplied  by  the  road  mechanic  or  division  engi- 
neer and  forwarded  to  the  supervisor  of  work  equipment. 

Form  L — Report  of  Shop  Repairs  to  Work  Equipment 

Data  on  this  form  should  be  furnished  by  the  shop  superintendent  and  for- 
warded to  the  supervisor  of  work  equipment. 

Form  B-2 — Service  Record 

This  form  is  the  reverse  side  of  Form  B-1  and  on  it  should  be  posted  data 
supplied  on  Forms  G,  I  or  J,  K  and  L. 

No  forms  have  been  designed  nor  are  any  illustrations  submitted  in  this  report  to 
indicate  the  manner  in  which  final  data  are  submitted  to  the  management.  It  is  felt 
that,  with  all  the  data  at  his  command,  the  supervisor  of  work  equipment  or  other 
responsible  officer  should  be  in  a  position  to  furnish  any  information  desired  by  the 
management. 


The  report  is  presented  as  information  with  the  recommendation  that  the  subject 
be  discontinued. 


Report  on  Assignment  7 
Report  on  Pneumatic  Tired  Tractor  Equipment 

R.  M.  Leeds  (chairman,  subcommittee),  Edgar  Bennett,  C.  E.  Herth,  F.  H.  McKenney, 
C.  E.  Morgan,  A.  J.  Neff,  T.  M.  Pittman,  F.  H.  Rothe. 

The  committee  finds  the  use  of  pneumatic  tired  tractor  equipment  by  farmers,  con- 
tractors, state  and  county  highway  departments  has  increased  greatly  during  recent 
years.  This  is  also  true  of  railroads,  but  to  a  lesser  degree.  The  failure  of  the  railways  to 
make  use  of  more  pneumatic  mounted  equipment  has  been  due  to  the  fact  that  equip- 
ment of  a  character  suitable  for  railroad  service,  has  not  been  available.  One  reason 
for  the  trend  from  the  steel  tired  equipment,  as  well  as  from  the  crawler-mounted 
tractors,  is  no  doubt  the  increased  mileage  of  paved  highways  over  which  such  equip- 
ment is  moved,  it  being  possible  to  operate  pneumatic  tired  equipment  much  more 
quickly  from  one  point  to  another  with  less  damage  to  the  highways,  and  to  the  equip- 


Maintenance    of   Way   Work   Equipment 


195 


Portable  Generator  Mounted  on  Pneumatic  Tires. 


Power-Operated  Mowing  Machine  Mounted  on 
Pneumatic  Tires. 


1 

^-^,. 
--  -J^^'-.' 

1 

Q 

i 

■"  ^^  " 

."<?  ■■  !■■■ 

^ 

M:.-^.       :#W^^^ 

'"  ... ^ 

1 

Small  Wheel  Tractor  With  Trailers  Used  by  Purchases  and  Stores  Department. 


196 


Maintenance    of   Way    Work    Equipment 


Pneumatic  Tired  Tractor  Mowing  Machine. 

ment  so  handled.  This  applies  to  railroads  in  moving  such  equipment  as  truck-mounted 
cranes  and  welding  outfits,  mowing  machines  and  tractors  from  one  job  to  another 
quickly  on  adjacent  highways,  thus  saving  delays  in  loading,  unloading,  and  delays  to 
rolling  stock  and  trains  when  making  such  moves. 

Another  inducement  accountable  for  the  increased  use  of  pneumatic  tired  tractor 
equipment  is  the  lower  cost  and  better  quality  of  pneumatic  tires  now  available.  Other 
reasons  for  this  transition  are  lower  first  cost,  lighter  weight  and  portability.  Such 
machines,  especially  those  formerly  operated  on  the  rails,  were  not  capable  of  as  ex- 
tensive and  diversified  use  as  the  pneumatic  tired  machines,  as  their  usefulness  was 
confined  to  the  distances  they  could  reach  from  the  track.  Delays  caused  by  traffic  were 
also  encountered  by  this  type  of  equipment. 


Auto  Railer — Traction  is  Obtained  Through  Friction  of  Pneumatic  Tires  on  Rails. 


Maintenance    of    Way    Work    Equipment 


Pneumatic  Tired  Diesel-Powered  Tractor  With  Road  Grader. 


Portable  Pneumatic  Tired  Utility  Grinder. 


Auto  Railer  in  Position  for  Offtrack  Operation. 


198 


Maintenance    of   Way   Work    Equipment 


As  compared  with  similar  crawler-mounted  equipment,  the  pneumatic  tired  equip- 
ment has  the  advantages,  as  stated,  of  lower  cost  per  rated  horsepower,  lighter  weight 
and  greater  portability  in  moving,  but  they  have  the  disadvantage  of  having  less  tractive 
power. 

Other  items  of  pneumatic  tired  equipment  not  classified  as  tractors  are  being  used 
to  advantage  by  railroads,  mostly  because  they  are  more  portable  and  easier  to  handle, 
thus  effecting  savings  in  time.  These  include  rail  grinders,  compressors,  generators,  welding 
outfits,  wheel  scrapers,  carryalls,  lawn  mowers  and  wheelbarrows.  Others,  such  as  trail- 


% 

^ 

m 

^ 

\j . . 

wy 

1 

1                   x^^^iuHi 

__^J^ 

Crane  Mounted  on  Pneumatic  Tired  Truck  Frame. 


ers,  lift  trucks  and  small  cranes  used  around  store  rooms,  freight  houses  and  round- 
houses, not  only  save  time  in  handling,  but  also  eliminate  to  a  large  extent  the  wear 
on  platforms  and  floors  and  reduce  damage  to  lading  carried  by  them. 

While  pneumatic  tired  equipment  is  being  used  advantageously  by  the  railroads 
to  a  limited  extent,  it  is  the  consensus  of  your  committee  that  cooperation  between  the 
railroads  and  the  manufacturers  in  developing  units  suitable  for  railroad  service  will 
largely  increase  the  use  of  such  equipment. 


This  report  is  submitted  as  information  with  the  recommendation  that  the  subject 
be  continued. 


Maintenance    of    Way   Work   Equipment 


199 


Report  on  Assignment  8 

Impact  Wrenches 

R.  A.  Morrison   (chairman,  subcommittee),  G.  J.  Ermentrout,  R.  K.  Johnson,  W.  G. 
Kemmerer,  Jack  Largent,  E.  H.  Mills,  P.  G.  Petri,  J.  C.  Ryan,  Roy  Wade. 

An  impact  wrench  is  a  tool  in  which  the  twisting  strain  exerted  in  turning  bolts, 
nuts,  screw  taps,  etc.,  is  applied  in  a  rapid  series  of  instantaneous  blows.  Compressed  air 
furnishes  the  power  in  the  two  wrenches  of  this  type  on  the  market  at  the  present  time. 

In  one  type,  the  impact  wrench  consists  of  a  "Multi  Vane"  air  motor,  cam,  hammer 
spring,  hammer  anvil  (enclosed  in  hammer  case),  and  chuck,  or  socket.  The  specially 
designed  cam  converts  air  motor  torque  into  rotary  impacts  by  action  on  the  hammer 
spring.  These  rotary  or  torsional  impacts  occur  at  the  rate  of  1,200  or  more  per  minute. 
Impacting  begins  when  resistance  to  turning  reaches  a  value  determined  by  the  strength 
of  the  spring  and  continues  until  the  air  is  shuti  off  or  the  torque  required  to  turn  the 
nut  falls  below  this  point. 


C/9»7  ^o<.<.f  «<S 


^ 


\\W^ 


^^ 


Ong^/ece  iy/»AfA9<vc 


Spring  and  Cam  Type  Impact  Unit. 


Htttj 


In  the  second  type — called  Power  Vane  wrenches — there  are  no  springs,  gears,  or 
resilient  member  in  their  construction.  The  impactive  effort  is  built  up  through  a  pair 
of  fly  weights,  similar  in  operation  to  a  fly-ball  governor,  except  that  rotation  is 
interrupted  each  half  revolution,  at  which  point  the  impact  is  delivered  to  the  socket 
through  a  shank.  A  slow  speed  rotor  motor  is  used. 

Reversible  (applying  and  removing)  and  non-reversible  (applying  only)  models  can 
be  purchased.  Various  models  for  maintenance  of  way  work  have  an  overall  length  of 
l(>%  in.  to  19%  in.,  weighing  13  to  27i^  lb.,  and  handle  bolts,  nuts,  etc.,  ^  to  1%  in.  in 
size.  However,  larger  and  heavier  models  are  made  and  used  by  the  mechanical  depart- 
ments of  railroads  ia  their  boiler  and  car  repair  work.  On  the  maintenance  of  way 
models  90-lb.  air  pressure  is  used  at  average  working  speeds,  and  40  cu.  ft.  of  air  is 
consumed  per  minute. 


200 


Maintenance    of    Way    Work    Equipment 


C<.c/7"C^/  iS^^^y^^ 


^^P 


Power  Vane  Wrench. 

These  hammers  are  being  used  for  nut  running  for  fitting  up  operations  on  steel 
structures,  on  cover-plate  jobs,  the  dismantling  and  assembling  of  frogs  and  switches, 
driving  screw  spikes,  and  track  bolting. 

The  low  torque  reaction  (recoil)  on  the  operator  reduces  scaffold  requirements  and 
makes  it  possible  to  use  these  wrenches  safely  at  overhead  or  arms-length  operations. 
However,  care  must  be'  exercised  to  avoid  overstressing,  as  the  only  safeguard  is  the 
judgment  and  skill  of  the  operator  as  to  the  amount  of  twisting  strain  exerted. 


This  report  is   submitted  as   information.  It   is   recommended   that   the   subject   be 
discontinued. 


Report  on  Assignment  9-b 

Arc  Welding  Equipment 

Collaborating  with  Committee  5 — Track,  and  with 
Electrical  Section,  Engineering  Division 

C.  E.  Morgan  (chairman,  subcommittee),  C.  M.  Angel,  R.  M.  Baldock,  C.  L.  Fero,  L.  B. 
Holt,  C.  H.  R.  Howe,  R.  K.  Johnson,  E.  H.  Ness,  J.  C.  Ryan,  R.  R.  Smith. 

The  report  on  arc  welding  will  be  confined  to  the  mounting  of  machines  for  main- 
tenance work.  Because  of  interest  in  the  manner  in  which  arc-welding  machines  may  be 
adapted  to  suit  the  users'  purpose,  illustrations  of  each  of  many  types  in  use  today  are 
presented  in  the  hope  that  they  may  help  someone  to  solve  his  particular  problems. 

Fig.  1  shows  a  unit  with  standard  skid-mounted  track  wheels  with  an  adapted 
undercarriage  of  motor  car  axle,  wheel,  and  bearing  assembly  and  with  transverse 
wheels  to  move  the  machine  in  a  horizontal  plane  out  to  the  side  of  track  where  the 
unit  comes  to  rest  on  its  adjustable-leg  stand  at  proper  track  clearance.  It  can  be  used 
on  or  off  the  track  depending  on  frequency  of  traffic.  One  advantage  is  the  ease  with 
which  the  unit  may  be  moved  by  towing  it  with  a  motor  car.  Some  such  units  have 
been  made  self  propelling. 


Maintenance    of    Way    Work    Equipment 


201 


Fig.  1.— Skid-Mounted  Track  Wheels. 


Fig.  2.— Truck-Mounted  Power  Take-off. 


Fig.  3. —Pneumatic  Tire 
Wheel  Mounted. 


202 


Maintenance   of   Way   Work   Equipment 


Fig.  4. — Track-Mounted  Power  Unit. 


Fig.  S. — Track-Mounted  Power  Unit,  Removed  from  Track. 


Fig.  2  shows  a  truck-mounted  power  take-off.  These  units  make  use  of  the  truck 
engine  for  power,  through  a  "V"  belt  drive  and  a  power  take-off  hooked  up  from  the 
transmission  or  drive  shaft.  They  are  used  for  crossing  and  frog  work  and  offer  the 
welder  a  means  for  hauling  his  grinding  machine,  welding  rods  and  other  materials  from 
one  job  to  another  independent  of  train  service.  This  type  of  unit,  with  panel  sides  or 
wire  mesh  sides,  enables  the  welder  to  keep  all  his  equipment  locked  up  and  ready  to  go. 
Truck  units  are  used  in  terminal  service  or  where  considerable  work  is  concentrated  in  a 
small  area. 

Standard  engine-driven  skid  units  mounted  on  pneumatic  tires,  like  the  one  shown 
in  Fig.  3,  are  used  where  it  is  possible  to  pull  a  machine  around  in  a  yard  for  frog  or 
crossing  work.  These  units  are  also  used  on  steel  structures  such  as  bridges  or  buildings. 
They  are  widely  used  by  welding  shops,  contractors  and  other  industries  outside  of  the 
railroad  group. 


Maintenance   of   Way   Work   E  q  u  i  p  m  e  n  t 


203 


R»^S|^^^^ 


Fig.  6.  —  Combination 
Pneumatic  Tired  Unit  Set 
on  Underslung  Push  Car. 


Fig.  7. — Underslung 
Push  Car. 


Fig.  8. — Side  View  of  Special  Crawler. 


Fig.  y. — End  View. 


Figures  4  and  S  illustrate  another  type  of  track-mounted  machine  with  take-off. 
This  unit  moves  on  the  rails  with  flanged  wheels  and  has  a  device  for  removing  it  from 
the  track.  The  welder  is  pushed  horizontally  from  the  track,  leaving  the  undcrframe  and 
wheels  on  the  track.  Then,  after  the  unit  gets  to  the  proper  clearance  position,  the 
frame  with  track  wheels  folds  up  against  the  unit  itself. 


204 


Maintenance    of    Way    Work    E  q  uipm  en  t 


Fig.  10.— Standard  Tractor  With  One  Arc. 


Fig.  11.— Track-Mounted  Quick  Take-off. 


Fig.  12.— Track-Mounted  Quick  Take-off  Set  Up  on  Shoulder. 


Maintenance    of    Way    Work    Equipment 


20S 


Fig.  13.— Track-Mounted  Quick  Take-off  Machines 
For  Train  Passage. 


Figures  6  and  7  show  a  combination  pneumatic  tired  unit  and  track-mounted  under- 
slung  push  car.  This  unit  has  the  added  flexibility  of  being  readily  moved  about  in 
yards  or  at  a  crossing,  out  on  a  highway,  on  city  streets,  or  along  the  shoulder  off  the 
rails,  and  can  also  be  readily  moved  on  the  rails  by  being  towed  by  a  motor  car  after 
it  is  loaded  on  its  underslung  carriage. 

Figures  8  and  9  show  crawler-mounted  self-propelled  units.  Some  machines  are  in 
use  where  traffic  is  dense  and  the  units  must  be  kept  off  the  track  at  all  times.  These 
units  have  one  or  two  arcs. 

Standard  tractors  of  the  crawler  type  are  sometimes  used  with  one  or  two  welding 
generators  mounted  on  them,  as  illustrated  in  Fig.  10.  They  can  be  kept  off  the  track 
except  when  crossing  bridges  or  trestles. 

Figures  11,  12  and  13  illustrate  a  track-mounted  machine  with  a  quick  take-off 
device.  These  units  are  mounted  on  an  underslung  track-mounted  carriage.  They  rest 
on  large  pipes  out  of  which  telescope  smaller  pipes,  which  in  turn  rest  on  still  smaller 
pipes  forming  the  support  for  an  adjustable-height,  four-legged  stand.  These  machines 
are  so  made  that  the  stand  on  which  they  rest  when  off  the  track  is  carried  along  with 
the  machine  when  being  employed  on'  the  track  at  such  work  as  building  up  rail  ends. 
These  machines  can  be  moved  from  the  track  in  two  minutes,  which  includes  the  time 
for  setting  up  the  stand  off  track  at  the  proper  height.  All  means  of  fastening  are  made 
for  quick  operation,  such  as  chains  and  hooks,  pointed  pins  and  holes  for  the  legs  of  the 
stand.  These  machines  are  used  on  the  track  for  rail-end  work,  and  off  the  track  for 
work  on  bridges,  crossings  and  frogs. 

Conclusions 

It  is  contended  by  many  that  the  use  to  which  welding  is  put  in  the  maintenance 
work  depends  on  the  mobility  of  the  equipment  associated  with  it.  To  this  end,  the 
mountings  described  have  been  designed  for  a  broad  field  of  application. 


The  report  is  submitted  as  information  and  it  is  recommended  that  the  subject  be 
discontinued. 


206 


Maintenance    of    Way    Work    Equipment 


Report  on  Assignment  11 
Oif-Track  Grading  Equipment 

A.  J.  Neff  (chairman,  subcommittee),  Edgar  Bennett,  G.  E.  Boyd,  J.  G.  Hartley,  N.  W. 
Hutchison,  R.  M.  Leeds,  T.  M.  Pittman,  F.  H.  Rothe,  F.  F.  Zavatkay. 

The  present  tendency  of  railroads  to  replace  expensive  on-track  equipment  with  the 
latest  off-track  machines  indicates  that  great  advantages  are  being  found  in  the  use  of 
crawler  machines.  Questionnaires  sent  to  IS  railroads  revealed  that  the  following  off- 
track  equipment  had  been  purchased  or  was  being  given  serious  consideration:  20  Bull- 
dozers; 9  bullgraders  (trailbuilders)  ;  9  crawler-mounted  loaders  with  bulldozer  blades; 
7  crawler-mounted  loaders  without  bulldozer  blades;  3  scrapers  or  carryalls  (wheel- 
mounted);  5  scrapers  or  carryalls  (not  wheel-mounted);  35  shovels;  66  draglines;  and 
18  combination  dragline-shovels. 

Bulldozers  and  Bullgraders  (Trailbuilders) 

As  bulldozers,  angledozers,  bullgraders,  and  trailbuilders  are  merely  trade  names 
used  by  all  manufacturers  of  this  type  of  equipment,  very  little  difference  in  general 
design  of  the  machines  is  encountered.  The  bulldozer  has  a  large,  shghtly  curved  rigid 
blade;  the  angledozer  has  a  similar  type  of  blade,  the  difference  being  that  it  can  be 
angled  to  throw  material  to  either  side,  which  is  one  of  the  features  of  the  trailbuilder. 
These  machines  are  operated  either  by  hydraulic  or  cable  control.  Cable-operated  blades 


Hydraulic  Operated  Trailbuilder  on  Crawler- 
Mounted  Tractor. 


can  only  be  lifted  up  and  must  depend  on  their  own  weight  to  force  themselves  into  the 
material,  while  hydraulic-operated  blades  exert  both  up  and  down  pressure.  Bulldozers 
or  angledozers  are  generally  used  in  leveling  off  or  spreading  loose  materials. 

The  trailbuilder  and  bullgrader,  which  are  identical,  have  a  smaller  curved  blade 
with  heavy  cutting  shoes.  These  blades  can  be  angled  to  throw  material  to  either  side 
or  to  cut  more  on  one  side  than  on  the  other,  and  are  used  in  harder  materials.  They 
are  usually  operated  by  hydraulic  control,  which  gives  them  both  up  and  down  pressure. 

These  machines,  being  very  flexible  units,  are  capable  of  performing  a  wide  variety 
of  off-track  work,  such  as  bank  widening,  cutting  drainage  ditches,  riprapping,  eliminat- 
ing banks  for  drainage  or  vision  purposes,  filling  small  bridges,  shifting  tracks,  grading 


Maintenance    of    Way    Work    Equipment 


207 


for  team  tracks,  cleaning  up  stock  coal  storage  piles,  dismantling  branch  lines,  leveling 
off  rubbish  at  dumps,  plowing  snow,  clearing  snow  and  rock  slides,  spreading  cinders  and 
ballast,  etc.  It  is  the  consensus  that  machines  of  this  type  are  invaluable  in  railroad 
work,  and  the  savings  effected  through  their  use,  in  many  cases,  have  paid  for  the 
original  investment  during  the  first  few  months  they  were  used.  The  fact  that  most  of 
the  railroads  report  this  type  of  machine  in  service  100  percent  of  their  available  time  is 
indicative  of  their  adaptability. 

Crawler-mounted  Front-End  Loaders 

This  type  of  machine  is  mounted  on  a  35  or  40-hp.  crawler  tractor  and  has  either  a 
5^  or  ^-cu.  yd.  bucket  mounted  on  the  front  end.  There  are  both  cable  and  hydraulic- 
operated  machines,  acting  on  the  same  principle  as  a  bulldozer,  except  that  the  bucket  is 
shoved  into  the  material  that  is  to  be  moved  until  it  is  full  and  then  raised  and  carried 
to  the  place  where  the  material  is  to  be  deposited.  This  type  of  machine  can  also  be 


rjfa.. 


Straight  Bulldozer,  Cable  Operated. 


Cable-Operated  Angledozer  with  Same  Type  of  Blade  as  Bulldozer. 


208 


Maintenance    of    Way    Work    Equipment 


Front-End  Loader — Cable  Operated  54 
Cu.  Yd.  Bucket  Mounted  on  40-Hp. 
Crawler  Tractor. 


Front-End  Loader — Hydraulic  Operated  ^-Cu.  Yd. 
Bucket — Mounted  on  40-Hp.  Crawler. 

equipped  with  bulldozer  or  angledozer  blades  instead  of  the  bucket,  and  the  change  can 
be  made  in  a  very  short  time. 

These  machines,  equipped  with  buckets,  have  proved  very  successful  in  ditching 
cuts  of  moderate  length,  and  have  been  used  with  a  large  measure  of  success  in  restoring 
embankments,  widening  banks,  surface  ditching,  building  roads,  grading,  loading  trucks, 
lining  tracks,  cleaning  up  coal  storage  piles,  and  plowing  and  loading  snow,  and  cleaning 
under  bridges.  The  hydraulic-operated  machine  shown  is  more  desirable  for  cleaning 
under  low  bridges  than  the  cable-operated  machine  because  of  the  high  frame  on  the 
latter. 

Certain  changes  might  be  desirable  in  this  type  of  equipment,  i.e.,  the  bucket  should 
be  as  wide  as  the  tread  of  the  crawlers  in  order  that  successive  cuts  can  be  made  in  the 
same  ditch,  each  pass  being  progressively  deeper;   hydraulic-operated  machines  should 


Maintenance    of    Way    Work    Equipment 


209 


Four  -  Wheel  .,^^ 
Scraper  —  Capac-  '^^ 
ity  20  Cu.  Yd. 


Two-Wheel  Scraper — Capacity  4  Cu.  Yd.,  Loading. 

have  a  pump  attached  to  the  front  of  the  motor;  and  smaller  and  narrower  machines 
should  be  made  for  cuts  of  very  close  clearance. 

Scrapers  or  Carryalls 
So  few  carryalls  are  in  use  on  railroads  that  very  little  information  is  available 
regarding  them.  Some  railroads  are  towing  small  scrapers  behind  their  crawler-mounted 
loaders.  Manufacturers  of  scrapers  are  offering  3  and  4-cu.  yd.  scrapers  for  35  and  40-hp. 
tractors  and  6  and  8-cu.  yd.  scrapers  for  the  60  and  70-hp.  machines.  Scrapers  are  also 
being  built  up  to  4S-cu.  yd.  capacities.  Those  up  to    12-cu.   yd.  capacity  are  mostly 


210 


Maintenance   of   Way   Work   Equipment 


>  Two-Wheel     Scraper  — 

Capacity  4  Cu.  Yd.,  Un- 
loading Position. 


Crawler-Mounted  Shovel — ^  Cu.  Yd. 

operated  by  hydraulic  action  and  larger  machines  by  cable.  There  are  two  kinds  of  wheel 
mountings:  two-wheel  and  four-wheel.  The  two-wheel  machine  is  more  desirable  for 
several  reasons;  it  can  be  operated  in  restricted  clearances,  dumps  from  the  rear,  and 
since  most  railroads  have  small  tractors,  the  smaller  machines  can  be  operated  with  the 
tractors  they  now  have.  The  four-wheel  scrapers  are  used  mostly  on  large  dirt  moving 
jobs,  and  larger  tractors  are  required  in  conjunction  with  their  use.  Due  to  their  large 
size,  the  four-wheel  machines  cannot  be  operated  where  clearance  is  limited;  they  also 
must  be  dumped  from  the  same  end  as  loaded  and  the  material  cannot  be  dumped  at  one 
time,  requiring  several  feet  to  get  rid  of  the  load.  Therefore,  four-wheel  scrapers  are 
recommended  for  large  areas  and  the  two-wheel  machines  for  restricted  space.  It  is 
expected  that  this  type  of  machine  will  be  more  fully  utilized  in  the  near  future. 

Shovels 
Crawler-mounted  shovels  hold  an  important  place  among  off-track  machines.  Few 
of  these  machines,  however,  are  purchased  as  straight  shovels.  Approximately  half  of  the 


M  a  i  n  t  ena  nee    of   Way   Work    Equipment 


211 


machines  reported  on  are  combination  dragline-shovels.  The  shovel  capacities  of  machines 
reported  on  vary  from  %  to  2  cu.  yd.  Smaller  machines  up  to  54-cu.  yd.  capacity  are 
more  desirable  for  right-of-way  work.  The  large  shovels  are  generally  used  in  gravel 
pits,  or  for  securing  riprap  and  emergency  material.  The  use  of  the  machines  has  also 
proved  advantageous  in  track  work  on  branch  lines  where  traffic  is  light  and  side-hill 
work  is  involved,  ditching  on  one  side  and  building  up  shoulder  on  the  other;  and  in 
filling  bridges;  with  trucks  making  line  changes;  digging  ditches;  excavating  for  build- 
ings; cleaning  slides,  etc. 

Draglines 

The  dragline  is  one  of  the  most  important  off-track  ditchers  due  to  the  wide  variety 
of  work  which  it  is  capable  of  performing.  These  machines  are  used  to  advantage  in 
bank  widening,  replacing  shoulders,  channel  changing,  channel  cleaning,  replacing  eroded 
channel  banks,  surface  ditching,  ditching  cuts,  and  loading  gravel,   cinders,  sand,  coal. 


Crawler-Mounted  Dragline — 1^-Cu.  Yd.  Bucket. 


emergency  material,  etc.  For  use  on  the  right-of-way  where  there  are  many  obstructions, 
machines  with  buckets  of  not  over  ^-cu.  yd.  capacity  are  most  popular.  Larger  sizes, 
up  to  1J4-CU.  yd.  capacities,  are  used  for  heavier  work.  Some  railroads  are  equipping 
these  machines  with  clamshell  buckets  and  magnets  and  using  them  in  scrap  yards,  freight 
yards,  and  shops  for  handling  heavy  material. 

Typical  Applications 

Some  of  the  machines  mentioned  in  this  report  are  used  in  conjunction  with  each 
other.  On  one  railroad,  during  a  slack  season,  it  was  necessary  to  do  14  miles  of  ditching 
in  double-track  territory,  most  of  which  was  side-hill  work,  with  some  work  to  be  done 
in  cuts.  As  there  was  very  light  traffic  through  this  territory  in  the  daytime,  and  no 
passenger  trains,  it  was  decided  to  tie  up  one  track  for  ten  hours  and  use  a  shovel  and  a 
dragline  on  the  job.  The  shovel  was  used  to  cast  the  inside  material  over  to  the  outside 
where  the  dragline  was  ditching,  and  then  the  dragline  was  used  to  dispose  of  the 
material.  Where  the  dragline  could  not  waste  the  material  far  enough,  a  bulldozer  was 
used.  The  only  machine  fouling  the  track  was  the  shovel.  Therefore,  a  foreman  and 
three  laborers  were  stationed  with  the  machines,  two  men  flagging,  and  the  others  as- 


212  Maintenance    of    Way    Work    Equipment 

sisting  the  shovel  over  the  track  and  keeping  the  track  clear  of  rocks  and  other  material 
that  dropped  from  the  shovel  on  the  live  track.  These  men  were  also  used  in  securing 
lineups  and  assisted  in  clearing  up  at  the  finish  of  work  and  when  starting  out  at  the 
beginning  of  the  day.  This  particular  job  was  done  at  a  great  saving  compared  with 
what  it  would  have  cost  had  on-track  ditchers  been  used. 

Another  railroad  had  a  job  of  track  shifting  to  perform,  and  it  was  decided  to  use 
a  bulldozer  on  the  job.  The  work  was  accomplished  by  the  machine  alone  in  one  day, 
while  ordinarily  it  would  have  cost  100  percent  more  to  do  the  work  by  other  available 
methods.  This  job  involved  leveling  the  fill  on  a  dump  and  swinging  the  track  over  on 
the  leveled-off  portion.  The  saving  effected  through  the  use  of  the  bulldozer  on  this  job 
can  readily  be  seen.  The  same  railroad  encountered  a  bridge  removal  job  on  a  side  track 
which  was  to  be  done  under  traffic,  involving  difficulties  of  falsework,  dismantling,  filling 
in,  etc.  A  bulldozer  was  used  to  push  the  fill  under  the  bridge  high  enough  to  permit 
blocking,  the  steel  was  cut  apart  and  removed,  and  the  fill  was  completed  in  30  days 
less  than  the  estimated  time,  at  an  appreciable  saving. 

Conclusion 

The  use  of  off-track  grading  equipment  will  expedite  work,  minimize  traffic  delays, 
perform  work  that  it  is  impossible  to  do  with  on-track  equipment,  and  effect  gratifying 
returns  on  investment  costs. 


The  report  is  presented  as  information  and  it  is  recommended  that  the  subject  be 
discontinued. 


Report  of  Committee  22 — Economics  of  Railway  Labor 

G.  M.  O'RouRKE,  Chairman,  F.  L.  Guy  L.  L.  Adams,  Vice-Chairman, 

Lem  Adams  C.  C.  Haire  J.  M.  Miller 

C.  W.  Baldridge  G.  H.  Harris  F.  R.  Paisley 

E.  J.  Bayer  J.  G.  Hartley  J.  A.  Parant 

F.  J.  Bishop  W.  E.  Heimerdinger  A.  E.  Perlman 
W.  H.  Brameld  W.  H.  Hillis  W.  G.  Powrie 
E.  J.  Brown  E.  T.  Howson  F.  S.  Schwinn 
H.  G.  Carter  H.  E.  Kirby  H.  M.  Stout 
H.  A.  Cassil  T.  Z.  Krumm  R.  R.  Strother 
J.  I.  Catherman  D.  a.  Kuebler  W.  H.  Vance 

A.  B.  Chaney  G.  M.  Magee  J.  C.  Wallace 

Armstrong  Chinn  J.  B.  Martin  Edward  Wise,  Jr. 

C.  M.  Chumley  J.  S.  McBride  W.  H.  Woodbury 

W.  E.  Cornell  E.  H.  McIlheran  C.  R.  Wright 

E.  A.  Craft  Committee 

To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 
No  report. 

2.  Analysis  of  operations  of  railways  that  have  made  marked  progress  in  the  reduc- 
tion of  labor  required  in  maintenance  of  way  work. 

Progress  report,  embracing  studies  of  the  Central  of  Georgia  Railway  "back-to-back 
fiat  method"  of  track  maintenance.  Submitted  as  information  page  214 

3.  The  relative  economy  of  combined  vs.  separate  bridge  and  building  gangs. 
Final  report — with  recommendations  for  inclusion  in  the  Manual  page  217 

4.  Labor  economies  resulting  from  improvements  in  drainage  practices. 

Final  report — submitted  as  information    page  21Q 

5.  Review  and  revise  factors  previously  established  for  equating  track  values  for 
labor  distribution. 

No  report. 

6.  Labor  economies  possible  through  the  use  of  highway  motor  vehicles  for  main- 
tenance forces. 

No  report. 

7.  Added  labor  economies  resulting  from  use  of  off-track  maintenance  equipment. 
Final  report — submitted  as  information   page  221 

8.  Labor  economies  resulting  from  periodic  spot  welding  of  rail  ends  as  compared 
with  less  frequent  out-of-face  welding. 

No  report. 

9.  Labor  economies  to  be  derived  from  keeping  vegetation  out  of  ballast. 
No  report. 

Special — Mechanization  in  Maintenance  of  Way  Department — Testimony  of  Carriers 
Special  Committee  before  the  Railroad  Carrier  Industry  Committee. 

Final  report — submitted  as  information   page  1  * 

The  Committee  on  Economics  of  Railway  Labor, 

G.  M.  O'Rourke,  Chairman. 

*  Page  number  refers  to  page  on  which   this   report  appeared   in   Bulletin  419 — SeptemberMDctobcr, 
1940,  and  to  the  page  in  which  it  will  appear  in  the  Monograph  Section  of  the  Proceedings  for  1941. 
Bulletin  421,  December,   1940. 

213 


214  Economics   of    Railway    Labor 


Report  on  Assignment  2 

Analysis  o£  Operations  of  Railways  That  Have  Made  Marked 

Progress  in  the  Reduction  of  Labor  Required  in 

Maintenance  of  Way  Work 

H.  A.  Cassil  (chairman,  subcommittee),  Lem  Adams,  E.  J.  Bayer,  F.  J.  Bishop,  E.  J. 
Brown,  H.  G.  Carter,  C.  C.  Haire,  W.  E.  Heimerdinger,  E.  T.  Howson,  H.  E.  Kirby, 
D.  A.  Kuebler,  G.  M.  Magee,  J.  B.  Martin,  J.  S.  McBride,  F.  R.  Paisley,  J.  A. 
Parant,  F.  S.  Schwinn,  W.  H.  Vance. 

Certain  changes  in  methods  of  track  maintenance  that  were  put  into  effect  on  the 
Central  of  Georgia  Railway  in  1932  have  been  followed  by  a  marked  reduction  in  the 
labor  required.  This  subcommittee  has,  therefore,  examined  the  methods  now  in  effect  on 
that  road  and  submits  its  report  on  their  nature,  advantages  and  disadvantages,  and 
their  applicability  to  other  railroads  or  portions  of  railroads. 

In  order  to  permit  the  members  of  the  committee,  and  particularly  members  of  the 
subcommittee,  to  observe  conditions  at  first  hand  and  talk  with  maintenance  of  way 
officers  and  employees,  a  meeting  was  held  at  Macon,  Ga.,  on  April  23,  1940,  in  con- 
nection with  which  a  motor  car  inspection  was  made  of  the  Central  of  Georgia  tracks 
between  Atlanta,  Ga.,  and  Macon  and  between  Macon  and  Birmingham,  Ala.,  a  total 
distance  of  388  miles. 

The  Central  of  Georgia  forms  a  network  which  covers  a  large  part  of  Georgia  and 
Alabama,  the  principal  freight  traffic  lines  extending  fiom  Birmingham  to  Macon  and 
thence  easterly  to  Savannah,  Ga.,  and  northerly  to  Atlanta.  Freight  traffic  density  on 
these  lines  averages  between  1,300,000  and  2,400,000  net  tons  per  year.  Lines  with  less 
traffic  reach  important  terminals  at  Chattanooga,  Tenn.,  Albany,  Ga.,  and  Augusta, 
while  branches  with  still  lighter  traffic  connect  with  other  points.  A  considerable  part  of 
the  passenger  traffic  between  Florida  and  the  middle  north  moves  over  its  rails.  The 
mileage  of  road  maintained  in  1939  was  1,861. 

On  practically  the  entire  line,  stable  roadbed  conditions  exist  and  drainage  is 
excellent.  Standard  widths  of  roadbed  are  18  ft.  for  principal  lines,  17  ft.  for  secondary 
lines  and  16  ft.  for  branches.  The  ballast  is  Birmingham  slag,  with  bank  run  gravel  and 
cinders  on  the  less  important  lines.  Ties  are  creosoted  pine  except  for  some  untreated 
cypress,  and  are  all  produced  on  line.  Ties  are  bored,  adzed  and  treated  at  the  com- 
pany's treating  plant  at  Macon.  Tie  plates  are  extensively  used.  All  new  rail  is  112  lb. 
and  is  now  control-cooled  and  end  hardened  at  the  mill. 

Prior  to  1932,  the  practice  on  this  road  was  to  require  each  section  gang  to  give 
one-fourth  its  track  a  full  out-of-face  hft  each  year,  making  necessary  tie  renewals  and 
gaging,  lining,  etc.  The  remainder  of  each  section  received  but  little  attention,  except 
where  conditions  demanded  immediate  repairs.  The  track  was  patrolled  daily. 

The  practice  begun  in  1932  and  still  in  effect,  sometimes  known  as  the  "flat  work" 
system,  contemplates  a  procedure  in  which  the  section  gangs  work  over  all  tracks  in  an 
orderly  sequence  once  every  12  to  18  months.  Working  back  to  back,  that  is,  two  gangs 
starting  at  the  hne  between  their  sections  and  working  away  from  each  other,  each  gang 
begins  early  in  the  year  and  goes  over  its  entire  section,  doing  all  of  the  following 
work  where  a  raise  on  new  ballast  is  not  involved: 

Replacing  all  ties  that  will  not  last  another  year 

Squaring  up  and  spacing  crossties 

Setting  up  and  replacing  missing  rail  anchors 


Economics   of    Railway    Labor 215^ 

Gaging,  with  replacement  of  corroded  tie  plates 
Tapping  down  spikes  and  replacing  bad  spikes 
Smoothing  and  cross-leveling  out-of-face 
Correcting  irregularities  in  line 
Tightening  and  replacing  bolts  and  oiling  joint  bars 

New  ballast  is  applied  in  track  surfaced  out-of-face  by  extra  gangs  where  new 
112-lb.  rail  is  laid,  or  where  the  ballast  has  so  deteriorated  that  satisfactory  results 
cannot  be  obtained  by  the  "flat  work"  of  the  section  gangs. 

Section  gangs  consist  of  a  foreman  and  four  laborers.  When  business  increased  dur- 
ing 1937  the  gangs  were  raised  to  six  men  per  crew,  commencing  with  April.  If  traffic 
again  becomes  as  heavy  the  number  of  laborers  will,  very  probably,  be  increased  to  six 
men.  This  minimum  force  is  employed  the  year  round  and  devotes  ten  months  of  each 
year  to  track  repairs  and  two  months  to  mowing  and  burning  weeds  and  brush  and 
cleaning  ditches.  Generally  the  work  is  started  in  January  and  completed  on  schedule 
unless  too  much  emergency  repair  work  interferes. 

The  full  gang  is  employed  five  days  per  week.  In  addition,  on  Saturday  the  foreman 
and  two  men  patrol  the  section,  inspect  switches  and  police  the  property.  Daily  track 
patrol  is  not  required  of  the  section   foreman,  except  in  the  event  of  heavy   rains  or 

Comparison  of  Labor  Employed  in  1929  and  1939 

Percent 
1929        1939        Decrease        Decrease 

Miles  main  line  maintained 1,926  1,861  65                    3 

Average  length  of  sections  7.82*  17.18*  9.36**  119** 

Number  of  section   foremen    246  108  138  56 

Number  of  B&B   foremen    23  15  8  35 

Number  of  extra  gang   foremen    6  5  1  17 

Number  of  section   laborers    1,150  600  550  49 

Number  of  extra  gang  laborers  126  100  26  21 

Number  of  B&B  laborers 94  76  18  19 

Number  of  B&B  carpenters 80  43  37  46 

•  Miles.        **  Increase. 

other  unusual  situations.  Road  supervisors  cover  their  districts  three  or  four  times  each 
week,  including  one  trip  on  a  locomotive,  and  direct  section  foremen  when  to  discontinue 
the  regular  work  temporarily  to  make  needed  repairs. 

Five  extra  gangs  are  employed  on  the  Central  of  Georgia,  consisting  of  a  foreman, 
an  assistant  foreman  and  20  men.  One  gang  is  worked  on  the  Savannah  division  and 
two  each  on  the  Macon  and  the  Columbus  divisions.  They  lay  rail,  augmented  by  sec- 
tion gangs;  raise  and  surface  track  out-of-face  and  assist  section  gangs  that  fail  to 
complete  flat  work  repairs  on  their  entire  sections.  They  are,  as  a  rule,  assigned  to 
primary  main  line  territory  of  710  miles. 

In  switching  yards,  "sweepers"  are  employed  to  keep  the  grounds  clean,  pick  up 
scrap,  oil  switches,  etc.  These  men  work  under  the  yard  section  foreman  but  do  not 
work  with  the  track  gangs  and  are  not  included  in  the  track  labor  allowances.  Each  has 
a  wheelbarrow,  a  scoop  and  a  heavy  rattan  push  broom. 

The  section  gangs  of  experienced  trackmen,  familiar  with  the  system  that  has  now 
been  in  effect  since  1931,  and  reUeved  of  daily  track  patrol,  the  policing  of  yard  tracks 
and  switching  leads,  and  the  general  out-of-face  work  done  by  the  20-men  extra  gangs, 
produce  thoroughly  satisfactory  results.  The  progress  is  greatly  expedited  by  the  fact  that 
a  uniform  force  is  worked  and  that  the  working  season  extends  throughout  the  year. 


216  Economics    of    Railway    Labor 

Monthly  reports  are  made  by  foremen,  supervisors  and  division  engineers  showing 
the  miles  completed  for  the  current  month  ,and  to  date. 

A  comparison  of  the  labor  employed  in  1Q29  and  1939  is  shown  in  the  table. 

Computations  based  on  returns  to  the  Interstate  Commerce  Commission  show  a  51 
percent  decrease  from  1929  to  1939  in  man-hours  of  sectionmen  time  per  equated  track 
mile,  although  freight  traffic  density  was  only  22  percent  less  in  1939  than  in  1929. 

It  is  obvious  that  only  a  part  of  this  reduction  in  labor  can  be  ascribed  to  the 
change  in  method.  A  considerable  part  of  it  is  due  to  the  same  causes  which  have  re- 
sulted in  reducing  maintenance  labor  expense  on  most  railroads;  namely,  curtailment  or 
abandonment,  because  of  reduced  revenue,  of  work  formerly  considered  necessary;  and 
greater  efficiency  of  labor.  It  is  the  experience  of  this  road  that  the  "flat  work"  method 
now  followed  is  better  adapted  to  its  conditions  than  the  "cycle"  method  formerly  in 
vogue. 

The  method  now  used  is  not  novel,  but  with  some  modifications,  is  in  effect  on  a 
large  share  of  the  railroad  mileage  of  this  country,  especially  on  tracks  which  carry 
medium  and  light  traffic.  The  back-to-back  feature  is  not  essential,  although  widely 
used  because  it  cuts  in  half  the  number  of  intervals  of  unworked  track.  The  conditions 
which  favor  the  use  of  this  method  are: 

1.  Medium  to  light  traffic 

2.  Stable  roadbed,  with  good  drainage  and  few  soft  spots,  slides,  or  other  features 
that  require  frequent  attention 

3.  Fairly  uniform  tie  renewals 

4.  No  daily  patrol  by  section  gangs 

This  method  has  some  important  advantages  where  conditions  favor  its  use,  chief 
among  which  are  the  following: 

1.  Less  time  lost  in  moving  from  place  to  place 

2.  Better  control  of  labor  output 

3.  More  uniform  tie  conditions 

4.  Maintenance  of  more  uniform  track  conditions 

5.  Permits  closer  check  and  comparison  of  work  done  on  different  sections,  thus 
strengthening  the  competitive  spirit 

A  disadvantage  of  this  method,  even  where  conditions  favor  its  use,  is  that  it  does 
not  permit  tie  renewals  to  be  made  early  in  the  season  and,  in  general,  does  not  permit 
the  doing  of  the  more  important  things  first.  This  objection  has  less  weight  where  there 
is  a  long  working  season. 

It  is  not  adapted  for  a  track  where  heavy  traffic  necessitates  frequent  light  surfac- 
ing, where  attention  must  frequently  be  given  to  chronic  places  of  trouble,  or  where 
forces  are  so  small  that  attention  can  only  be  given  to  bad  conditions  as  they  arise. 

Conclusions 

1.  The  "flat  work"  method  employed  in  track  maintenance  on  the  Central  of  Georgia 
merits  consideration  on  lines  of  medium  to  light  traffic,  with  fairly  uniform  tie  renewals 
and  with  a  stable  roadbed  having  few  soft  spots  or  other  conditions  requiring  frequent 
and  special  attention. 

2.  On  such  lines  it  reduces  the  amount  of  time  lost  in  moving  forces  from  place  to 
place,  permits  better  control  of  the  labor  output,  brings  about  the  more  uniform  dis- 
tribution of  tie  renewals,  creates  more  uniform  track  conditions  and  permits  comparisons 
to  be  made  of  the  work  done  on  different  sections,  thereby  strengthening  the  competitive 
spirit  among  the  forces. 


Economics    of    Railway    Labor  217 

3.  This  method  is  not  adapted  to  tracks  where  heavy  traffic  necessitates  frequent 
light  surfacing,  where  frequent  attention  must  be  given  to  places  of  chronic  and  recur- 
ring trouble  or  where  the  forces  are  so  small  as  to  require  their  constant  attention  to  one 
trouble  spot  after  another. 


Report  on  Assignment  3 

The  Relative   Economy  of  Combined  vs.  Separate  Bridge 
and  Building  Gangs 

C.  M.  Chumley  (chairman,  subcommittee),  W.  H.  Brameld,  H.  A.  Cassil,  J.  I.  Cather- 
man,  A.  B.  Chanev,  Armstrong  Chinn,  W.  E.  Cornell,  E.  A.  Craft,  T.  Z.  Krumm, 
E.  H.  Mcllheran,  F.  R.  Paislev,  A.  E.  Perlman,  H.  M.  Stout,  R.  R.  Strother,  W.  H. 
Vance,  J.  C.  Wallace,  C.  R.  Wright. 

In  making  a  study  of  this  subject,  the  committee's  interpretation  is  that  "combined" 
gangs  handle  renewal  and  maintenance  work  on  bridges  and  culverts  (except  steel 
bridges),  buildings  and  miscellaneous  structures  (except  those  of  considerable  importance, 
probably  of  steel,  brick  or  stone  construction)  over  an  assigned  territory,  or  as  directed; 
while  "separate"  gangs  comprise  bridge  gangs,  which  handle  only  bridge  and  culvert 
work  and  other  miscellaneous  heavy  work,  as  directed,  carpenter  gangs,  which  do  only 
building  and  hghter  miscellaneous  work,  and  paint  gangs,  which  do  only  painting,  both 
bridge  and  building. 

In  the  combined  gangs,  your  committee  excludes  those  which  work  on  steel  bridges 
for  the  reason  that  most  roads  prefer  to  handle  this  work  with  special  or  system  gangs, 
provided  with  special  tools  and  roadway  machinery.  For  similar  reasons,  the  more  im- 
portant building  work  is  excluded  or  left  optional,  since  it  is  felt  that  an  ordinary  gang 
will  not  be  equipped  to  erect  structures  larger  than  the  average  station,  office  building, 
or  shop  building.  However,  the  combined  gang  or  the  separate  building  gang,  should  be 
able  to  maintain  such  structures  ecnomically. 

In  order  to  determine  the  prevaihng  practice,  a  questionnaire  was  forwarded  to  S3 
representative  railroads  throughout  the  United  States  and  Canada,  38  of  which  replied, 
furnishing  valuable  information  on  the  subject.  These  38  roads  have  a  combined  mileage 
of  approximately  232,202,  with  3,303  miles  of  steel  and  masonry  bridges,  1,500  miles  of 
timber  bridges,  and  with  approximately  80  percent  of  the  buildings  and  miscellaneous 
structures  of  wood.  Twenty-seven  of  these  roads,  with  85  percent  of  the  total  mileage, 
95  percent  of  the  steel  and  masonry  bridges,  and  80  percent  of  the  timber  bridges,  use 
combined  gangs.  Eleven  roads,  with  IS  percent  of  the  total  mileage,  S  percent  of  the 
steel  and  masonry  bridges,  and  20  percent  of  the  timber  bridges,  use  separate  gangs. 

It  was  found  that  some  of  the  roads,  which  use  combined  gangs  as  a  general  practice, 
have  separate  gangs  for  building  work  in  their  larger  terminals.  Other  roads,  which  use 
combined  gangs  for  bridge  and  building  maintenance,  use  separate  gangs  for  painting, 
while  several  roads,  which  use  separate  gangs  for  bridge  and  building  maintenance, 
combine  the  painting  with  the  building  gangs. 

Some  of  the  economies  claimed  for  the  combined  gangs  are: 
Reduction  in  number  of  foremen 
Fewer  outfit  cars 
Reduced  investment  in  motor  cars,  tools  and  other  roadway  machinery 


218 Economics    of    Railway    Labor 

More  economical  distribution  of  available  force,  with  much  less  loss  of  time  in 

movement  of  gangs 

Training  bridge  and  building  men  in  all  phases  of  the  work  in  that  department, 

resulting  in  all  employees  being  available  and  qualified  to  render  efficient  service 

on  any  assignment 

Simplifies  handling  seniority  problems,  in  that  all  bridge  and  building  employees 

in  the  various  classifications  appear  on  one  roster  so  that  they  can  be  assigned 

according  to  their  seniority  without  regard  to  whether  they  are  bridge  carpenters, 

helpers,  etc.,  or  building  carpenters,  helpers,  etc. 

Affords   more   continuous   employment,   thereby    developing   more   highly    trained 

and  efficient  men 

Shortens    the    designated    maintenance    district,    permitting    closer    inspection    of 
bridges  and  buildings,  producing  greater  efficiency  through  better  planning  of  work 
FaciUtates  handling  of  materials  and  supphes 
Condenses  supervision 

Some  of  the  advantages  or  economies  claimed  for  separate  gangs  are: 

Opportunity  for  working  fewer  men  in  gangs  assigned  to  building  or  other  light 
work 

Improvement  in  efficiency  by  being  able  to  select  foremen  and  men  more  highly 
trained  in  the  separate  classes  of  work,  thereby  increasing  production  and  improv- 
ing quality 

The  ability  to  use  tools  and  roadway  machinery  more  continuously,  enables  a 
road  to  effect  the  economies  resulting  from  a  larger  investment  in  such  tools  and 
equipment 

Much  additional  argument  can  be  produced  for  both  combined  and  separate  gangs, 
but  after  considerable  study  and  careful  analysis  of  the  subject,  the  committee  arrives 
at  the  following  conclusion,  supported  by  appropriate  definitions. 

RELATIVE  ECONOMY  OF  COMBINED  AND  SEPARATE  GANGS 

The  relative  economy  of  combined  or  separate  gangs  for  bridge  and  building  work 
depends  upon  the  conditions  prevailing  on  individual  railroads  and,  in  many  cases,  on 
grand  divisions  or  districts  of  a  single  railroad.  For  railroads  in  general,  with  half  or 
more  of  their  bridges  of  timber  construction  and  with  a  large  proportion  of  their  build- 
ings of  frame  construction,  combined  gangs  are  preferable  to  separate  gangs.  See  defini- 
tions for  Gang — Combined,  and  Gang — Separate,  in  the  Glossary. 
Gang — Combined. — One   handling    renewal    and    maintenance    work    on    bridges    (other 

than  those  of  steel)  and  culverts,  buildings  and  miscellaneous  structures  (other  than 

those  of  considerable  importance  and  commonly  of  steel,  brick  or  stone  construction) 

over  an  assigned  territory,  or  as  directed. 
— Separate. — One  handling  only  bridge  and  culvert  work  and  other  miscellaneous  heavy 

work  as  directed;   or  handling  only  building  and  lighter  miscellaneous  work;   or 

handling  only  painting,  both  bridge  and  building,  or  either. 

The  committee  recommends  that  the  above  conclusions  be  adopted  and  published  in 
Chapter  22  of  the  Manual,  following  the  matter  on  programming  of  bridge  and  building 
work,  and  that  the  definitions  be  adopted  and  published  in  the  Glossary. 


Economics    of    Railway    Labor 


219 


Report  on  Assignment  4 

Labor  Economies  Resulting  From  Improvements  in 
Drainage  Practices 

E.  H.  Mcllheran  (chairman,  subcommittee),  L.  L.  Adams,  Lem  Adams,  C.  W.  Baldridge, 
F.  J.  Bishop,  J.  I.  Catherman,  A.  B.  Chaney,  C.  M.  Chumley,  W.  E.  Cornell,  E.  T. 
Howson,  T.  Z.  Krumm,  D.  A.  Kuebler,  J.  B.  Martin,  A.  E.  Perlman,  F.  S.  Schwinn, 
R.  R.  Strother,  W.  H.  Vance,  W.  H.  Woodbury. 

Your  committee  refers  to  pages  1^3  to  1-63,  inclusive,  of  the  Manual  for  general 
descriptions  of  and  information  about  the  various  types  of  drainage,  including  intercept- 
ing ditches  for  cuts  and  fills,  side  ditches  at  the  foot  of  slopes,  tile  pipe  and  perforated 
corrugated  pipe  for  draining  road  beds,  French  or  rock  drains,  and  other  special  drainage 
practices  and  will  not  repeat  these  descriptions  in  this  report. 

Many  reports  have  been  made  to  the  Association  indicating  the  necessity  for  good 
roadway  drainage  and  the  benefits  to  be  derived  therefrom,  some  of  which  are  found 
in  the  following  volumes  of  the  Proceedings:  Vol.  40,  p.  346;  Vol.  39,  pp.  320-562-565; 
Vol.  38,  pp.  173-357;  Vol.  37,  p.  141  ;  Vol.  36,  p.  1092;  Vol.  35,  p.  348;  Vol.  34,  p.  132; 
Vol.  33,  p.  304-330-377;  and  Vol.  32,  p.  169.  Vol.  31,  p.  601,  gives  references  to  studies 
made  in  former  years. 

These  reports  indicate  savings  in  labor  for  roadway  maintenance  and  for  track  laying 
and  surfacing,  due  to  stabiUzation  of  the  roadbed  by  improved  drainage,  as  well  as 
reductions  in  ballast  requirements,  in  damage  to  rail  and  other  track  materials,  and  in 
damage  to  rolling  stock  and  lading,  and  the  elimination  of  train  delays  due  to  slow  orders. 

Your  committee  has  attempted  to  determine  the  monetary  saving  in  labor  resulting 
from  improvement  in  drainage  practices,  and  mailed  inquiries  to  52  railroads,  operating 
about  208,000  miles  of  road.  We  received  replies  from  30  railroads,  operating  152,690 
miles  of  road,  but  of  these  only  20  furnished  any  figures,  although  practically  every 
officer  replying  stated  that  economies  resulted  from  improvement  in  drainage.  The 
replies  received  from  railroads  which  furnished  some  figures  are  shown  in  the  table. 


Sub-Surface  Drainage 


Feet  of  Annual  Saving  in  Labor 

Track  Cost  of                           Percent 

Drained  Installation      Amount       of  Cost 

487,460  $553,114           $96,974          17.6 


Number  of 

Railroads  Type  of 

Reporting       Installation 
11  Tile  pipe  in  cuts 

1  Tile  pipe  in  fills   ..       1,475  5,719  372  6.5 

8         Perforated    metal 

pipe  in  cuts   18,618  45,584  9,019  20.0 

14  Perforated    metal 

pipe  in  fills   93,083  238,109  37,063  15.6 

10         French    or    rock 

drains    155,480  225,031  38,771  17.2 


Date  of 
Installation 

1912-1939 
1929 

1927-1939 

1928-1940 

1923-1939 


Surface  Drainage 

5  Intercepting  ditches  114,598        $  53,696  $23,746         44.2  1890-1939 

2  Grading    the    right 

of  way    50,600  3,902  6,104        156.0  1937-1939 


220 Economics    of    Railway    Labor 

Tile  Drains 

An  example  of  the  economies  secured  from  tile  drain  pipe  is  afforded  by  an  installa- 
tion in  a  cut  on  the  main  line  of  the  St.  Louis  Southwestern  Railway  a  short  distance 
south  of  Pine  Bluff,  Ark.,  on  what  is  known  as  Sorrells  hill.  At  this  location  the  track 
is  on  a  one  percent  gradient  for  IJ/2  miles  and  is  then  practically  level  for  a  mile  across 
four  small  ridges.  There  is  one  cut  3,500  ft.  long  half  way  up  the  one-percent  grade, 
another  cut  1,000  ft.  long  at  the  summit  of  the  grade,  and  four  cuts  each  1,000  ft.  long 
in  the  next  mile.  The  distance  from  the  beginning  of  the  first  soft  spot  to  the  end  of 
the  last  one  is  2.2  miles. 

The  material  in  these  cuts  is  clay  that  has  very  little  supporting  quality  when  wet, 
and  these  cuts  were  saturated  at  all  times.  The  track  was  ballasted  with  gravel,  but  it 
could  not  be  held  to  line  and  surface,  and  although  either  section  or  extra  gangs  were 
employed  on  the  track  in  these  cuts  practically  every  day,  it  was  impossible  to  keep  it 
in  a  condition  that  would  preclude  derailments. 

In  1920,  tile  drains  were  installed  in  all  six  of  these  cuts,  a  total  of  8,349  ft.  of 
track  being  drained  by  installing  8-in.  longitudinal  drains  on  both  sides  of  the  track  and 
6-in.  laterals  at  intervals  of  16^  ft.  along  the  track,  one  lateral  draining  into  the  longi- 
tudinal pipe  on  one  side  of  the  track  and  the  next  one  into  the  pipe  on  the  opposite  side. 
The  tile  drains  were  installed  according  to  the  general  instructions  shown  in  Proceedings 
Vol.  22,  page  719,  Exhibit  1^,  for  the  drainage  of  soft  spots  by  tile  on  both  sides  of  the 
track.  The  total  cost  of  the  installation  was  $15,162.17. 

As  soon  as  the  tile  was  installed,  water  began  flowing  from  the  drains,  the  condition 
of  the  track  improved,  and  within  12  months  the  roadbed  became  sohd  and  all  trouble 
from  irregular  surface  and  hne  from  this  section  of  road  disappeared.  Permanent  slow 
orders  of  10  or  15  miles  per  hour  were  removed  and  trains  now  operate  at  a  speed  of 
60  miles  per  hour.  The  tile  in  the  long  cut  on  the  one-percent  grade  and  in  three  of  the 
other  cuts  is  still  functioning,  but  in  two  of  the  cuts  where  the  tiles  were  not  laid  on  a 
steep  grade  some  indication  of  heaving  developed  about  three  years  ago  and  some  poles 
were  driven  to  correct  the  condition. 

It  is  estimated  there  was  a  reduction  of  three  track  laborers,  which  at  present  rates 
of  pay  amounts  to  $2,620  per  annum,  in  addition  to  the  large  savings  due  to  increases 
in  train  speeds  and  reductions  in  damage  to  rolling  stock  and  lading. 

Perforated  Corrugated  Metal  Pipe  Drain  in  Fill 

An  example  of  the  economies  secured  from  the  installation  of  perforated  galvanized 
metal  drain  pipe  is  afforded  in  a  fill  on  the  Illinois  Central  Railroad  on  the  north  approach 
to  the  crossing  of  the  Bayou  De  Chien  drainage  canal  about  8  miles  north  of  Fulton, 
Ky.,  on  the  Bluford  district.  This  fill  was  constructed  in  1925  with  material  secured  from 
adjacent  cuts,  which,  when  excavated  dry,  seemed  to  be  satisfactory  for  embankment 
construction,  but  which  after  being  placed  and  becoming  wet,  had  very  little  supporting 
power  and  began  to  slide.  After  the  line  was  placed  in  operation,  the  slides  were  filled 
with  earth  and  cinders,  but  a  section  about  1,000  ft.  long  with  an  average  height  of 
SO  ft.  continued  to  cause  trouble.  Due  to  a  slide  in  1928,  it  was  necessary  to  drive  219 
ft.  of  open-deck  trestle  across  this  fill  in  order  to  maintain  traffic.  By  1934  this  trestle 
had  been  extended  to  a  total  of  466  ft.  because  of  additional  slides.  When  it  became 
necessary  in  1939  to  make  heavy  repairs  to  the  portion  of  the  trestle  first  constructed, 
an  investigation  was  made  to  determine  the  exact  condition  of  the  fill  and  ascertain  if 
it  could  be  stabilized.  This  investigation,  which  consisted  largely  of  test  borings  with  a 
two-inch  auger,  revealed  a  large  number  of  water  pockets  in  the  deposits  of  cinders  and 
gravel  which  had  been  unloaded  to  restore  the  embankment. 


Economics    of    Railway    Labor  221 

This  fill  was  drained  with  8-in.  perforated,  corrugated,  asphalt-coated  iron  pipe. 
Thirty-one  laterals  were  placed  at  intervals  of  not  to  exceed  50  ft.  and  were  from  58  ft. 
to  207  ft.  long,  extending  into  the  fill  from  both  sides  to  the  bottom  of  the  water  pock- 
ets. From  the  end  of  each  lateral  pipe  in  the  water  pockets  a  perforated  riser  extended 
upward  to  the  surface  of  the  fill.  In  addition,  four  short  laterals  were  placed  where 
water  pockets  existed  directly  beneath  the  track.  When  some  of  the  water  pockets  were 
tapped,  as  much  as  100  gal.  per  min.  flowed  from  the  pipe  for  several  days  before  the 
pockets  were  completely   drained. 

Altogether,  4,000  lin.  ft.  of  pipe  was  installed  in  the  fill,  in  the  31  main  laterals  and 
risers  and  4  short  laterals.  Since  the  completion  of  the  work,  the  fill  has  apparently 
stabilized.  The  total  cost  of  this  job  was  about  $13,500,  and  the  estimated  annual  saving 
is  $2,250,  consisting  of  $1,000  for  labor  patrolling  track,  $500  for  work  trains  unloading 
material  at  slides,  $500  for  labor  unloading  material  and  surfacing,  and  $250  for 
maintenance  of  the  trestle. 

Conclusion 

The  study  made  by  this  subcommittee  substantiates  the  conclusions  reached  by  pre- 
vious committees  of  this  Association  that  (a)  adequate  drainage  of  the  roadbed  is  essen- 
tial to  the  economical  maintenance  of  track,  (b)  that  economies  can  be  effected  by  the 
various  methods  reported  on  herewith,  and  (c)  that  the  particular  type  of  installation 
best  adapted  to  any  location  varies  with  the  local  conditions  existing  at  the  specific  point. 


This  report  is  submitted  as  information. 


Report  on  Assignment  7 

Added  Labor  Economies  Resulting  from  Use  of  Off-Track 
Maintenance  Equipment 

Armstrong  Chinn  (chairman,  subcommittee),  L.  L.  Adams,  Lem  Adams,  E.  J.  Bayer, 
W.  H.  Brameld,  E.  J.  Brown,  H.  A.  Cassil,  F.  L.  Guy,  W.  H.  Hillis,  E.  T.  Howson, 
H.  E.  Kirby,  T.  Z.  Krumm,  G.  M.  Magee,  J.  S.  McBride,  J.  M.  Miller,  A.  E.  Perlman, 
W.  H.  Woodbury. 

The  assignment,  as  stated,  implies  that  labor  economies  result  from  the  use  of 
maintenance  equipment,  consequently,  the  purpose  of  this  report  is  to  point  out  the 
additional  economies  that  may  be  expected  when  work  is  done  with  off-track  equipment. 
When  we  try  to  determine  the  economies  or  savings  that  may  be  expected  from  the  use 
of  a  certain  type  of  equipment  we  must,  of  necessity,  compare  it  with  something  else, 
such  as  another  type  of  equipment,  another  method  of  doing  the  work  or  other  condi- 
tions affecting  labor  or  material  before  we  can  arrive  at  any  sort  of  an  answer.  For 
instance,  the  labor  cost  of  renewing  ballast  is  reduced  when  the  life  of  the  ballast  is 
extended  by  cleaning  it,  but  as  a  rule  the  labor  cost  of  cleaning  it  will  be  less  with 
off-track  equipment  than  with  rail-bound  equipment  requiring  expensive  work  train 
service.  Also,  recent  interpretations  of  certain  labor  agreements  have  so  increased  the 
cost  of  operating  some  classes  of  rail-bound  maintenance  equipment  as  to  make  its  use 
prohibitive.  This  is  a  trend  that  is  being  met,  to  .some  extent,  by  the  development  of 
off-track  equipment. 


^'^'^      Economics    of    Railway    Labor 

Generally  speaking,  the  development  of  off-track  maintenance  equipment  has  been 
brought  about  by  the  following  factors: 

(a)  Today  main  line  tracks  must  be  kept  clear  for  the  fast  and  exacting  schedules 
that  are  being  run  on  most  railroads  in  both  passenger  and  freight  service,  and  mainte- 
nance of  way  gangs  are  being  forced  to  conduct  their  work  in  a  way  that  will  not 
interfere  materially  with  the  operation  of  trains. 

(b)  Working  agreements  with  certain  classes  of  employees  make  it  desirable  to  keep 
work  equipment  off  the  rails. 

(c)  More  hours  of  productive  work  can  be  secured  from  off-track  equipment  than 
rail-bound  equipment  as  there  is  little  or  no  time  lost  in  clearing  trains. 

(d)  The  proximity  of  good  highways  to  many  railroads  makes  it  easy  and  economical 
to  move  men,  some  classes  of  materials  and  certain  types  of  off-track  equipment  quickly 
with  trucks  running  on  the  highways  instead  of  with  motor  cars  running  on  the  rails. 
This  applies  particularly  to  specialized  gangs,  such  as  in  the  water  service  department 
and  to  men,  materials  and  equipment  needed  for  emergency  work. 

(e)  Off-track  equipment  has  the  ability  to  get  to  places  and  to  do  work  that  cannot 
be  reached  with  rail-bound  equipment. 

A  partial  hst  of  track  maintenance  equipment  divided  between  rail-bound  equip- 
ment, off-track  equipment  and  equipment  which  is  used  on  the  rails  but  can  be  set  off 
to  clear  traffic  is  shown  in  the  table. 

Where  air  compressors  and  electric  generators  are  mentioned  in  the  list,  it  is  under- 
stood that  the  numerous  small  tools  that  can  be  operated  by  these  power  sources  are 
included. 

As  will  be  noted  from  the  Hst,  a  wide  variety  of  off-track  equipment  is  now  avail- 
able and  it  is  expected  that  this  list  will  grow  as  its  advantages  are  recognized  and 
additional  equipment  is  developed  for  new  uses. 

With  the  exception  of  some  recently  developed  earth-moving  equipment,  rail-bound 
equipment  is,  as  a  rule,  heavier  and  has  more  power  than  off-track  equipment,  and  as  a 
result  will  do  more  work  in  a  given  period  of  time,  but  because  of  traffic  interruptions, 
work  train  and  flagging  expenses,  and  the  additional  men  in  the  operating  crew  required 
by  recent  interpretations  of  certain  labor  agreements,  the  unit  costs  are  usually  higher. 
As  these  extra  costs  are  increased,  additional  incentive  will  be  given  for  further  develop- 
ment and  use  of  off-track  equipment.  The  costs  of  train  slow-ups  and  delays  caused  by 
rail-bound  equipment  are  seldom  considered  when  figuring  the  unit  costs  of  work  done 
by  it,  but  they  are  there  and  at  times  are  considerable. 

The  development  of  the  crawler  tread  has  probably  done  more  than  any  other  one 
thing  to  release  work  equipment  from  the  rails  and  now  numerous  types  of  earth- 
moving  equipment,  mounted  on  crawler  treads,  are  replacing  car-mounted  shovels  and 
car-top  ditchers.  The  most  popular  of  these  is  the  combined  crawler  shovel  and  drag- 
line. Machines  of  this  type  have  moved  earth  for  bank  widening  at  costs  ranging  from 
6  to  12  cents  per  cubic  yard,  compared  with  IS  to  45  cents  per  cubic  yard  for  car-top 
ditchers.  Most  of  this  saving  is  in  the  labor,  as  the  off-track  equipment  can  be  operated 
with  smaller  crews  and  without  the  service  of  a  work  train  and  work  train  crew. 

Labor  costs  have  been  reduced  by  crawler-mounted  and  portable  air  compressors 
and  electric  generators  used  for  operating  tamping  tools  as  these  power  units  can  move 
along  with  the  work  without  the  labor  cost  and  lost  time  inherent  in  moving  long  pipe 
and  power  lines. 

The  committee  has  been  unable  to  find  any  railroads  that  have  kept  comparative 
cost  data  showing  in  dollars  and  cents  the  additional  labor  savings  that  will  be  realized 


Economics   of    Railway    Labor 


223 


Classification  of  Maintenance  Equipment 


Rail-Bound  Equipment 

1.  Power  shovels 

2.  Locomotive  ditchers 

3.  Spreader  ditchers 

4.  Car-top  ditchers 

5.  Locomotive  cranes 

6.  Large  ballast  cleaners 

7.  Ballast    scarifiers    on 
AAR   trucks 

8.  Ballast  cars 

9.  Dump   cars 

10.  Pile  drivers 

11.  Large    rail    and    joint 
oilers 

12.  Roadbed  oilers 

13.  Weed  burners   on   AAR 
trucks 

14.  Chemical  weed  sprayers 
on  AAR  trucks 

15.  Detector  cars 

16.  Snow  plows 


Off-Track  Equipment 

1.  Crawler  shovels 

2.  Crawler  draglines 

3.  Crawler  bulldozers 

4.  Crawler  tractors    with 
front   end   loaders 

5.  Crawler-pulled   carry-all 
scrapers 

6.  Crawler  cranes  with  pile 
driving  leads 

7.  Crawler  cranes 

8.  Trucks 

9.  Truck-mounted  crane 

10.  Truck-mounted 
air   compressors 

11.  Truck-mounted 
generators 

12.  Truck-mounted 
earth  drill 

13.  Portable  air  compressors 

14.  Portable  generators 

15.  Portable  wheel-mounted 
weed  burners 

16.  Portable  chemical  weed 
sprayers 

17.  Portable  oil   sprayers 

18.  Power  weed  mowers 

19.  Power  ballast  cleaners 

20.  Self-contained      gasoline 
ballast  tampers 

21.  Oxy  -  acetylene    welding 
and  cutting  equipment 

22.  Rail    switch    and   frog 
grinders 

23.  Tie  spacers 

24.  Track  liners 


Equipment    Used    on    the 

Rails  But  Which  Can  Be 

Set   Off   the   Track 

1.  Power  ballaster 

2.  Power  cribber 

3.  Ballast  scarifier 

4.  Power  weed  and  ballast 
discers 

5.  Power   jacks 

6.  Power  track  shifters 

7.  Power  tie   adzers 

8.  Power  tie  cutters 

9.  Power  tie  borers 

10.  Tie  pullers 

11.  Power  spike  pullers 

12.  Air  compressors 

13.  Electric  generators 

14.  Power    and   hand   rail 
layers 

15.  Power    cranes    and    rail 
layers 

16.  Power  rail  saws 

17.  Power  and    hand    rail 
drills 

18.  Power  wrenches 

19.  Rail  expanders 

20.  Rail  grinders 

21.  Oxy-acetylene    rail    end 
hardening  machine 

22.  Rail  and  joint  oilers 

23.  Weed  mowers 

24.  Motor    cars,    push    cars 
and  trailers 

25.  Auto  railers 

26.  Trackbarrows 
2  7.  Monocars 


from  the  use  of  off-track  equipment,  and  is  therefore  unable  to  give  any  comparative 
figures;  however,  the  committee  finds  that  the  use  of  off-track  equipment,  as  compared 
with  rail-bound  equipment,  should  make  possible  labor  economies  as  follows: 

1.  Greater  production  per  man-hour,  as  little  or  no  time  will  be  lost  clearing  trains. 

2.  A  substantial  reduction  in  flagging  expense,  as  very  little,  if  any,  will  be  required. 

3.  EHmination  of  work  train  crew  expense. 

4.  Elimination  of  additional  and  unnecessary  men  required  on  rail-bound  equipment 
by  recent  labor  board  decisions. 

5.  A  reduction  in  the  cost  of  doing  work  that  could  not  be  reached  by  rail-bound 
equipment  and  therefore  had  to  be  contracted  or  done  by  less  efficient  methods. 


224 Economics    of    Railway    Labor 

6.  A  marked  saving  in  time,  on  certain  classes  of  work,  by  moving  men,  materials 
and  equipment  in  trucks  on  highways  instead  of  by  motor  cars  on  the  rails  or,  for 
longer  distances,  by  train,  with  resulting  lost  and  dead  time  on  account  of  infrequent 
train  service. 

It  is  pointed  out,  however,  that  in  considering  the  labor  economies  resulting  from 
the  use  of  off-track  equipment  one  must  not  lose  sight  of  the  fact  that  rail-bound 
equipment  has  its  place  and  is  not  likely  to  be  displaced  for  certain  work. 


This  report  is  submitted  as  information. 


Report  of  Committee  6 — Buildings 


L.  H.  Laffoley,  Chairman, 

A.  T.  Hawk 

A.  C.  Copland,  Vice- 

CM.  Angel 

E.  G.  Hewson 

Chairman, 

G.  A.  Belden 

C.  D.  Horton 

G.  A.  Rodman 

E.  Christiansen 

N.  D.  Howard 

C.  H.  Sandberg 

H.  M.  Chxjrch 

A.  C.  Irwin 

C.  P.  Schantz 

H.  G.  Dalton 

F.  R.  Judd 

E.  W.  Scripture,  Jr. 

A.  G.  Borland 

L.  P.  Kimball 

L.  W.  Smith 

W.  T.  Dorrance 

H.  C.  Lorenz 

A.  L.  Sparks 

Hugo  Fllippi 

E.  K.  Mentzer 

A.  B.  Stone 

J.  P.  Gallagher 

H.  A.  Pasman 

0.  G.  Wilbur 

W.  G.  Harding 

Committee 

To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 
No  report. 

2.  Preparation  of  specifications  for  railway  buildings. 
No  report. 

3.  Requirements  and  design  of  garage  buildings  for  railway  service. 
Final  report — submitted  as  information  below. 

4.  Railroad  warehouse  requirements  for  handhng  quick  frozen  products. 
No  report. 

5.  Methods  of  determining  the  protective  value  of  paints. 

Final  report — submitted  as  information  page  227 

6.  Refrigerator  equipment  for  cold  storage  houses  and  rooms,   collaborating  with 
Committee  1 — Power  Supply,  Electrical  Section,  Engineering  Division,  AAR. 

No  report. 

The  Committee  on  Buildings, 

L.  H.  Laffoley,  Chairman. 


Report  on  Assignment  3 
Requirements  and  Design  of  Garage  Buildings  for  Railway  Service 

J.  P.  Gallagher  (chairman,  subcommittee),  W.  G.  Harding,  N.  D.  Howard,  A.  C.  Irwin, 
H.  C.  Lorenz,  H.  A.  Pasman,  G.  A.  Rodman,  O.  G.  Wilbur. 

General 

Transportation  of  passengers  over  the  highways  in  buses  operated  by  railways,  and 
the  movement  of  express  and  freight  by  automobile  equipment,  have  so  expanded  during 
recent  years  that  it  has  become  necessary  to  develop  garages  at  terminals  and  large  way 
station  points,  where  buses,  trucks  and  other  equipment  can  not  only  be  properly  stored 
and  handled,  but  running  repairs,  general  overhauling  and  maintenance  can  be  done  under 
economical  and  modern  methods.  In  the  development  of  garages,  faciUties  for  the  oper- 
ating personnel  and  other  employees  should  also  be  carefully  studied  and  analyzed. 

In  planning  these  facilities  consideration  must  be  given  to  the  location,  design,  con- 
struction and  arrangement,  consistent  with  the  importance  of  the  contemplated  improve- 
ment, the  size  of  the  initial  development,  and  probable  future  increase  in  various 
operations  in  the  plant  and  the  storage  requirements. 


Bulletin  421,  December,  1940. 


225 


226 Buildings 

Location 

Garages,  whether  small  or  large,  should  be  isolated  from  other  structures  in  order  to 
reduce  to  a  minimurrt  the  hazard  of  exposure  from  fire.  The  introduction  of  garage 
occupancies  into  portions  of  buildings  used  as  storehouses  or  shops,  or  other  railroad 
facilities,  is  not  recommended.  Large  bus  and  truck  garages  should  be  located  as  near 
the  passenger,  freight  or  express  facilities  or  terminal  as  possible,  so  as  to  reduce  the 
expense  of  non-productive  operation  between  the  garage  and  the  operating  terminal. 

Design 

Garage  facilities  for  the  storage  and  maintenance  of  bus  or  trucking  equipment, 
should  be  of  simple  but  substantial  design.  The  introduction  of  columns  into  the  building 
should  be  reduced  to  a  minimum,  where  possible,  consistent  with  the  type  of  structure 
selected.  This  is  particularly  recommended  in  the  live  and  dead  storage  areas  where  the 
bus  or  trucking  equipment  is  stored  or  handled. 

In  terminal  units,  the  entire  layout  of  offices,  shops  and  storage  area  should  be  placed 
on  one  floor.  The  dead  storage  area  should  preferably  be  confined  in  the  rear  of  the 
building,  and  should  be  of  adequate  size  to  meet  the  demands  of  the  terminal,  and  be 
cut  off  from  the  remainder  of  the  facilities  by  fire  walls  with  openings  large  enough  to 
handle  the  equipment.  The  live  storage  areas  should  be  equipped  with  wash  racks,  and 
oiling  and  greasing  pits  or  elevating  racks  near  the  entrance.  Pits  or  elevating  racks  for 
inspection  and  repair,  should  be  located  at  the  rear,  or  where  they  will  not  interfere  with 
the  movement  of  vehicles,  should  the  cars  require  layover  for  light  or  heavy  repairs. 
Permanent  lighting  and  outlets  for  portable  head  lights  should  be  provided.  Oil  and 
grease  traps  should  be  installed  in  drainage  lines  where  sinks,  floor  drains  or  other 
plumbing  fixtures  are  used  to  dispose  of  oils,  grease  and  volatile  materials. 

Rooms  cut  off  by  standard  fire  walls  should  be  constructed  around  the  live  storage 
areas  for  auxiliary  facilities  such  as  welding,  painting  and  spraying,  motor  repairs,  battery 
repairs  and  charging,  upholstering,  vulcanizing,  and  for  storerooms  for  materials  and 
repair  parts.  These  facilities  should  be  placed  with  due  regard  for  efficient  and  economical 
shop  operation.  Toilet,  wash  rooms  and  locker  facilities  should  be  provided  for  machinists 
and  workmen.  Storage  space  for  grease,  lubricating  oils,  waste  and  wiping  rags,  should 
be  segregated  from  the  general  storage  supplies. 

Fuel  storage  facilities  for  bus  and  truck  terminals  and  shops  should  embody  the 
most  modern  and  latest  layout  of  tank  and  pump  design,  and  should  be  installed  in 
accordance  with  the  latest  rules  and  regulations  of  the  National  Board  of  Fire  Under- 
writers and  other  authorities  having  jurisdiction.  Facilities  for  lubrication  and  tire 
inflation  should  be  provided. 

Offices  for  the  personnel,  consisting  of  necessary  private  offices,  conference  rooms, 
general  office,  toilet  facilities,  and  registry  and  call  rooms,  should  be  included  in  the 
facility,  and  so  located  as  to  be  easily  accessible  from  the  street  and  the  live  storage  and 
repair  shop  areas.  These  rooms  may  be  connected  by  corridors,  but  should,  as  a  group, 
be  cut  off  from  the  shop  areas  by  fire  walls  with  standard  protected  openings.  Where 
adequate  ground  space  is  not  available,  offices  and  facilities  for  personnel  may  be  placed 
in  a  second  story  over  the  live  storage  areas.  If  space  limitations  demand,  some  of  the 
shop  facilities,  such  as  the  upholstering  shop,  may  also  be  placed  on  the  second  floor, 
with  elevator  service  between  the  floors  to  handle  repair  parts  and  materials. 

At  terminal  points,  and  at  way  stations  where  crews  change  or  lay  over,  toilet  and 
locker  rooms,  and  rest  rooms,  should  be  provided  for  chauffeurs.  In  connection  with  bus 
chauffeurs'  requirements,  tailoring  and  valet  service  is  deemed  essential  and  should  be 
worked  into  the  layout. 


Buildings 227 

Construction 

Garage  buildings  should  preferably  be  of  fire  resistive  construction.  Slow  burning 
or  mill  construction  may  be  used  with  proper  safeguards. 

When  garage  occupancies  are  introduced  into  storehouse  or  shop  buildings  to  take 
care  of  one  or  two  passenger  cars  or  trucks,  the  garage  area  should  be  cut  off  from  the 
remainder  of  the  building  by  fire  wall  construction  without  access  of  any  kind  through 
the  wall  from  the  garage  space. 

Large  facilities  should  be  heated  by  a  plant  preferably  housed  in  a  separate  building, 
or  may  be  provided  within  the  structure  if  properly  cut  off  from  the  rest  of  the 
facilities  by  fire  walls.  All  lighting  should  be  electric  with  wiring  run  in  rigid  metal  con- 
duit in  accordance  with  the  latest  National  Electrical  Code,  and  lighting  fixtures  pro- 
vided with  vapor-proof  lamps  and  guards  as  may  be  required  by  the  occupancy  or  use 
of  the  separate  rooms.  Openings  in  fire  walls  between  room  areas,  should  be  properly 
protected  with  self-closing  or  automatic  fire  doors  of  approved  types  to  meet  the  speci- 
fications of  the  National  Board  of  Fire  Underwriters  and  local  building  and  fire  law 
requirements.  Special  consideration  should  be  given  to  the  mechanical  ventilation  of 
paint  and  spraying  rooms.  Disposal  of  gases  to  the  outer  air  from  these  rooms  should  be 
arranged  so  that  the  exhaust  will  not  become  a  nuisance. 

Fire  Protection 

Large  structures  for  bus  and  truck  storage  and  maintenance,  should  have  a  standard 
fire  standpipe  system,  and  it  is  further  recommended  that  an  approved  automatic 
sprinkler  system  be  installed.  An  approved  system  of  watchmen's  tour  service  should  be 
provided  if  the  facility  warrants  such  protection.  Fire  fighting  apparatus  and  portable 
equipment  should  meet  the  requirements  as  established  by  the  latest  rules  of  the  National 
Board  of  Fire  Underwriters  and  local  building  and  fire  laws  applying  to  such  installations. 

Conclusion 

As  a  whole,  each  problem  of  large  bus  or  truck  garage  design  must  be  treated 
separately,  so  that  all  faciUties  will  be  in  proper  relation  to  each  other  and  to  the  plant 
as  a  unit.  In  addition,  the  plan  should  be  studied  so  that  any  final  arrangement  adopted 
may  permit  of  proper  expansion  without  materially  affecting  the  elements  of  efficiency 
and  economy  embodied  in  the  initial  layout. 


The  report  is  presented  as  information. 


Report  on  Assignment  5 
Methods  of  Determining  the  Protective  Value  of  Paints 

C.  M.  Angel  (chairman,  subcommittee),  H.  M.  Church,  H.  G.  Dalton,  A.  G.  Borland, 
A.  T.  Hawk,  C.  D.  Horton,  A.  C.  Irwin,  L.  P.  Kimball,  G.  A.  Rodman,  C.  H. 
Sandberg,  E.  W.  Scripture,  Jr. 

Introduction 

Paint  has  become  one  of  the  most  important  materials  used  by  railroads;  its  use 
results  in  great  savings  in  maintenance  and  appearance.  Therefore,  railroads  have  become 
keenly  interested  in  the  durability  of  paints  for  the  purposes  used. 

Today  the  railroads  in  many  cases  must  rely  on  the  paint  manufacturer's  predic- 
tion of  the  Ufe  of  a  paint.  The  producer  bases  his  claim  on  extensive  long-time  atmos- 


228 Buildings 

pheric  tests  to  determine  to  what  extent  breakdown  of  the  material  will  occur.  As  the 
railroads  have  no  way  to  check  these  claims,  it  is  sometimes  found  that  a  so-called  long- 
life  paint  fails  early  in  service,  in  which  case  the  railroad  suffers  a  loss,  as  many  gallons 
of  the  paint  may  have  been  applied  when  failure  is  discovered.  This  not  only  involves 
the  cost  of  the  material  but  also  the  cost  of  the  labor. 

In  time,  factors  will  be  developed  from  the  tests  suggested  herein  whereby  the  dura- 
bility of  one  paint  can  be  readily  compared  with  another.  In  other  words,  the  paints 
must  be  studied  from  the  angle  of  durability  or  resistance  to  breakdown. 

To  ascertain  the  manner  in  which  paints  are  now  being  purchased  by  the  railroads 
and  the  tests  being  made  to  check  the  Ufe  of  paints  used,  a  survey  was  made  of  the 
practices  of  39  railroads.  The  facts  disclosed  by  this  investigation  are  summarized 
as  follows: 

Number  of 
Railroads 

Using  ready  mixed  paints   38 

Mixing  all  paints  used  1 

Mixing  part  of  paints  used  1 

Using  trade  name  paints  only  20 

Using  specification  paints  only    10 

Using  trade  name  and  specification  paints 9 

Making  weatherometer  check  tests  and  no  chemical  tests  3 

Making  chemical  tests  and  no  weatherometer  tests  9 

Making  both  weatherometer  and  chemical  check  tests  7 

Making  exposure  panel  tests 2 

Making  check  tests  before  paint  is  purchased  2 

All  except  two  of  the  railroads  surveyed  purchase  all  their  paints  ready  mixed,  in- 
cluding paints  purchased  to  specifications  or  trade  name.  One  railroad  mixes  some  of 
the  paints  it  uses,  namely,  enamels,  lacquer,  building  paints  and  shellacs;  another  mixes 
all  paints  used. 

The  railroads  that  buy  paint  on  specifications  do  so  for  the  purpose  of  insuring 
delivery  of  a  product  which  has  been  found  under  certain  conditions  to  give  relatively 
good  surface  protection  or  decoration.  The  use  of  these  specifications  has  been  perpetu- 
ated regardless  of  their  age,  as  the  purchaser  is  fearful  of  substituting  a  manufacturer- 
recommended  paint,  as  no  means  are  available  to  the  railroad  to  evaluate  the  claims  in 
a  short  period  of  time. 

Since  research  is  constantly  developing  better  paints,  railroads  committed  to  speci- 
fication paints  may  lose  the  economies  which  result  from  paint  improvement.  They  may 
also  pay  a  higher  price  for  a  product  complying  with  specification  requirements  which 
could  be  purchased  on  the  paint  manufacturer's  recommendation  at  a  lower  cost.  When 
a  standardized  method  of  testing  paints  has  been  adopted  by  the  railroads,  the  trend 
will  be  somewhat  away  from  the  use  of  specification  paints  and  toward  the  purchase  of 
paints  recommended  by  the  paint  manufacturer. 

Tests  conducted  by  the  railroads  should  be  as  simple  as  possible.  It  should  not 
be  inferred  that  such  tests  are  designed  to  determine  the  extreme  life  of  the  paints,  as  this 
would  be  duplicating  work  previously  done  by  the  manufacturers  in  evaluating  the  life 
of  their  products.  The  railroad  test  must  be  such  as  will  make  it  possible  to  select  from 
a  group  of  paints  recommended  for  certain  work,  one  having  the  greatest  economic  value. 
To  do  this  three  methods  may  be  considered:  (1)  Long-time  exposure  tests,  (2)  chemical 
analysis,  and  (3)  laboratory  accelerated  weathering,  in  which  the  paint  is  subjected  to 
moisture,  light,  heat  and  cold  under  definitely  prescribed  cycles,  or  other  special  tests. 

The  tests  outlined  by  your  committee  in  this  report  are  offered  as  suggested  means 
through  which  paints  can  be  tested  to  ascertain  their  comparative  qualities. 


Buildings 229 

Paint  Testing  Procedure 

In  testing  paints  care  must  be  exercised  to  conduct  tests  under  conditions  similar  to 
those  to  which  the  paint  will  be  subjected  after  application. 

It  will  not  suffice  to  test  a  paint  only  for  light,  heat,  moisture  and  cold,  when  it 
is  to  be  used  on  train  sheds  where  the  paint  will  be  continually  subjected  to  sulphur  gases 
from  locomotive  smoke.  An  additional  test  is  needed  to  ascertain  the  film  breakdown 
under  sulphur  gas.  If  a  paint  were  recommended  for  use  where  salt  air  is  prevalent, 
then  a  test  would  be  required  to  ascertain  the  film  reaction  to  saline  moisture.  When 
protective  paints  are  being  considered  for  the  coating  of  steel  coal  bins,  they  should  be 
tested  for  resistance  to  abrasion  and  to  the  dilute  sulphuric  acid  leachings  which  result 
from  the  sulphur  in  the  coal  combining  with  the  moisture  present.  In  a  like  manner, 
paints  for  use  on  hot  surfaces  should  be  tested  under  temperatures  within  the  range  of 
service  conditions. 

Therefore,  in  view  of  the  large  number  of  paints  now  on  the  market,  it  is  impossible 
to  set  up  a  test  procedure  for  each  class  and  its  use.  If  each  group,  however,  is  tested 
under  the  same  set  of  predetermined  conditions,  factors  will  be  developed  whereby  one 
paint  can  be  compared  with  another  and  proper  selection  made  from  the  group  tested. 

Paint  Failures 

Before  taking  up  the  actual  test  procedure  of  paints,  it  may  be  well  to  consider  and 
define  briefly  the  various  paint  failures: 

Checking  (Figures  1  and  IS). — This  defect  takes  the  form  of  fine  splits  or  rup- 
tures in  the  paint  which  break  the  surface  into  innumerable  small  irregular  areas,  but 
which  are  in  the  top  coats  only  and  do  not  extend  through  to  the  surface  underneath. 
Slight  checking  is  not  a  serious  defect  because  the  durability  and  the  protective  value  of 
the  paint  are  not  affected,  nor  does  checking  make  repainting  difficult.  The  usual  cause 
of  checking  is  the  presence  of  too  soft  an  undercoat,  which  can  be  avoided  by  allowing 
plenty  of  drying  time  between  paint  coats  and  by  making  sure  that  each  undercoat  is 
properly  formulated  to  insure  its  being  harder  than  the  succeeding  coat. 

Alligatoring  (Figures  2  and  14). — This  defect  is  similar  to  checking  in  character 
although  the  ruptures  in  the  paint  film  are  much  wider  and  the  surface  is  broken  into 
larger  irregular  areas.  Like  checking,  it  affects  the  top  coats  only  and  does  not  extend 
through  to  the  surface  underneath.  Alligatoring,  however,  gives  the  surface  an  unsightly 
appearance.  It  seriously  affects  the  durability  of  the  paint  and  makes  repainting  difficult. 
The  cause  of  alligatoring  is  always  too  soft  an  undercoat.  This  may  be  due  to  the  use 
of  too  much  oil,  to  insufficient  drying  time  between  coats  or  to  the  use  of  impure  oil  or 
other  vehicles  which  dry  to  a  soft  film. 

To  avoid  alligatoring,  make  sure  that  the  undercoats  have  plenty  of  time  in  which 
to  dry  and  that  they  are  properly  formulated  to  insure  their  being  harder  than  the 
succeeding  coats. 

Cracking  and  Scaling  (Figures  3,  13,  17  and  19). — These  two  defects  are  closely  re- 
lated, since  scaling  is  a  later  stage  of  cracking.  Cracking  is  a  rupture  of  the  paint  film 
extending  down  to  the  surface  to  be  protected.  This  allows  moisture  to  enter  behind  the 
paint  film,  which  loosens  the  paint  and  scaling  results.  This  defect  is  caused  by  the  use  of 
a  paint  which  becomes  hard  and  brittle  as  it  ages  and  can  no  longer  follow  the  movement 
of  the  surface  underneath. 

If  cracking  and  scaling  have  occurred  over  the  entire  surface  it  is  usually  advisable 
to  remove  all  of  the  old  paint  by  means  of  a  torch  and  scraper  before  repainting.  Other- 
wise, the  old  film  will  probably  continue  to  scale,  carrying  the  new  paint  with  it. 


230 


Buildings 


Fig.  1. — Cracking  and  Checking 
and  Cracking. 


Fig.  2. — AUigatoring. 


Fig.  3. — Cracking  and  Scaling 


Fig.  4. — Blistering  and  Peeling. 


Fig.  S. — Spotting.  Fig.  6.— Washing. 

Common  Painting  Defects 


Buildings 


231 


Fig.  7. — ^Wrinkling. 


Fig.  8. — Bleeding  Over  Knot. 


Fig.  9. — Discoloration  Over  Cedar 
or  Red  Wood. 


»# 


■AS     U  y    ,."*«•     , 


f'% 


'■\  ,*1 


\i  ,  %'' 


Fig.  10. — Dirt  Discoloration   U^iU 
Mildew  (right). 


Fig.  11. — Sagging.  Fig.  12. — Running. 

Common  Painting  Defects 


232 Buildings 

Blistering  and  Peeling  (Fig.  4). — The  most  common  cause  of  blistering  is  the  pres- 
ence of  moisture  in  the  material  behind  the  paint  film.  Peeling  quite  naturally  follows 
blistering  in  most  cases,  since  the  paint  which  has  blistered  no  longer  grips  the  surface 
properly,  and  a  comparatively  small  amount  of  pressure  is  sufficient  to  force  it  completely 
from  the  surface.  In  some  cases,  the  heat  of  the  sun  is  enough  to  increase  the  vapor 
pressure  of  the  moisture  in  the  material  so  that  it  will  cause  blistering.  In  interiors,  it  is 
usually  the  heat  of  a  radiator  or  a  riser  which  causes  the  trouble.  The  more  moisture- 
tight  a  paint  is,  the  more  apt  it  is  to  blister.  Therefore,  a  paint  that  permits  some  escape 
of  the  moisture  behind  it,  and  that  grips  the  surface  properly  is  less  likely  to  develop 
this  trouble. 

The  best  way  to  avoid  blistering  is  to  make  sure  that  the  surface  to  be  painted  is 
thoroughly  dry.  In  the  case  of  porch  columns  which  are  painted  on  all  sides,  it  is  neces- 
sary to  be  particularly  careful,  because  blistering  is  apt  to  occur  if  there  is  moisture  in 
the  column  when  it  is  painted. 

On  repainting  a  bhstered  surface,  it  is  necessary  to  scrape  off  all  the  defective  paint, 
allow  the  surface  to  dry  thoroughly  and  repaint  as  on  new  work.  The  priming  coat  on 
such  work,  if  properly  designed  and  given  adequate  drying  time,  will  permit  the  surface 
to  dry  more  thoroughly,  and  yet  tend  to  prevent  the  entrance  of  moisture  from  the  out- 
side. If  leaks  or  faults  in  construction  are  responsible  for  the  presence  of  moisture, 
these  should,  of  course,  be  properly  repaired  before  anything  else  is  done. 

Spotting  (Fig.  5). — Spotting  is  characterized  by  loss  of  gloss,  fading  and  early  chalk- 
ing in  spots  or  small  areas  due  to  absorption  of  oil  from  the  finishing  coat  by  the  porous 
surface  underneath.  It  is  very  likely  to  occur  on  new  work  that  is  given  only  two  coats, 
or  old  work  painted  with  one  coat.  Spotting  usually  appears  more  prominently  with  dark 
tints  and  colors.  This  defect  will  not  occur  when  sufficient  coats  of  properly  formulated 
paint  are  applied. 

Washing  (Fig.  6). — This  condition  occurs  when  a  paint  film  contains  ingredients  that 
are  soluble  in  water  or  when  soluble  compounds  are  formed  by  chemical  reactions  after 
the  paint  has  been  applied.  Washing  may  be  noticed  in  the  form  of  streaks  near  the 
lower  edge  of  clapboards  and  in  accumulations  on  column  footings  or  building  founda- 
tions. The  material  that  is  dissolved  out  of  the  paint  will  collect  in  these  places  and  when 
the  water  evaporates  the  streaks  can  be  plainly  seen. 

Wrinkling  (Fig.  7). — ^The  principal  cause  of  this  defect  is  an  excessively  thick  coat 
of  paint,  sometimes  exaggerted  by  the  excessive  use  of  drier.  When  paint  is  appUed  in 
too  thick  a  film,  it  is  impossible  for  it  to  dry  uniformly  and  after  the  surface  skin  has 
formed  the  later  drying  of  the  part  underneath  causes  the  surface  to  wrinkle.  There  are 
sometimes  contributing  factors,  such  as  changes  in  temperature  or  excessive  humidity 
during  the  drying  period,  but  even  under  unfavorable  drying  conditions,  wrinkHng  can 
be  avoided  if  the  coat  is  brushed  out  to  a  thin,  even  film.  It  is  not  customary  to  remove 
the  old  paint  when  wrinkling  has  occurred,  although  in  some  cases  this  is  the  easiest 
way  of  producing  a  first-class  repaint  job.  If  the  wrinkling  has  occurred  only  over  lim- 
ited areas,  the  ridges  can  be  rubbed  down  with  a  fairly  coarse  sandpaper  before 
repainting. 

Bleeding  Over  Knots  (Fig.  8). — Bleeding  of  this  type  is  caused  by  the  oil  in  the  paint 
dissolving  substances  in  the  knot,  and  can  usually  be  prevented  by  coating  knots  with  a 
thin  resin-free  shellac  or  other  recommended  materials  after  the  priming  coat  has  been 
applied.  One-half  of  the  knot  shown  in  Fig.  8  has  been  so  treated. 

Discoloration  Over  Cedar  or  Redwood  (Figures  9  and  16). — This  appearance  of  dark 
spots  through  or  on  the  paint  film  is  caused  by  dark-colored  water-soluble  substances  in 
the  wood  which  are  brought  to  the  surface  by  moisture  and  deposited  there.  The  paint 


Buildings 


233 


Fig.  13.— Flaking  of  Paint  Over  Summerwood  of  Ponderosa  Pine. 


Fig.  14.— Alligatoring  of  a  Mixture  of  White  Paint  and  Dark  Blue  Enamel. 


234 


Buildings 


Fig.  15. 


-Checking  and  Crumbling  of  White  Lead  Paint 
That  Has  Been  Neglected. 


is  in  no  way  responsible  for  this  trouble,  which  may  be  avoided  by  allowing  the  wood  to 
weather  thoroughly  before  it  is  painted. 

Dirt  Discoloration  and  Mildew  (Fig.  10).— These  conditions  are  frequently  confused 
with  each  other.  The  right  half  of  the  illustration  shows  a  mildewed  surface  and  left 
half  dirt  discoloration.  Finishing  coats  that  contain  too  much  oil  are  likely  to  dry  soft 
and  tacky,  forming  the  type  of  surface  that  catches  and  holds  every  particle  of  dust  and 
dirt.  On  the  other  hand,  a  finishing  coat  made  on  the  basis  of  a  good  formula  will  pro- 
duce a  glossy  but  sufficiently  hard  film  to  resist  excessive  dirt  collection.  Mildew  is  a 
dark-colored  fungus  growth  which  tends  to  form  under  the  combined  conditions  of 
moisture,  warmth  and  shade.  It  also  develops  more  readily  on  soft  paint  films  than  on 
harder  ones.  Where  mildew  is  encountered,  as  much  of  it  as  possible  should  be  removed 
before  repainting. 

Early  Loss  of  Gloss  and  Early  Chalking  (Fig.  18). — If  pronounced  sudden  loss  of 
gloss  or  chalking  occurs  shortly  after  painting,  it  is  probably  due  to  incorrect  formula- 


Buildings 


235 


tion  of  the  paint  or  to  the  presence  of  moisture  in  some  form  (frost,  fog,  rain,  etc.)  dur- 
ing the  drying  of  the  paint.  Soft  undercoats  which  were  not  allowed  sufficient  time  for 
drying  may  reduce  the  gloss  of  the  finish  coat. 

Running  and  Sagging  (Figures  11  and  12). — Running  and  sagging  are  associated 
defects.  Both  are  nearly  always  due  to  the  application  of  too  much  paint.  If  the  paint 
is  high  in  oil  content,  there  is  a  tendency  to  apply  it  too  freely,  and  consequently  the 
paint  will  run  or  sag.  A  paint  of  correct  formulation,  brushed  on  a  suitable  surface  in 


Fig.  16. — Bleeding  of  Redwood  Extractives  Through  Paint,  Because  of  Moisture  in  the 
Walls.  Puddles  of  Water  Were  Formed  in  the  Basement,  Because  Tree  Roots  Clogged 
the  Sewer. 


a  workmanlike  manner,  never  will  show  either  of  these  defects.  For  repainting,  the 
preparation  of  a  surface  with  these  defects  is  similar  to  the  preparation  of  a  surface 
that  has  shown  wrinkling;  that  is,  the  rough  portions  of  the  surface  are  smoothed  with 
sandpaper  before  the  first  repaint  coat  is  applied. 

Physical  Characteristics — Test  Procedure 

In  testing  paints  certain  physical  characteristics  must  be  considered  along  with  the 
life.  These  physical  characteristics  determine  in  the  beginning  whether  it  is  even  worth 
while  to  make  extensive  tests. 

In  addition  to  others,  a  test  should  be  conducted  on  a  fairly  large  area  to  ascertain 
the  number  of  square  feet  the  paint  will  cover.  Further  physical  tests  include  determina- 
tions of  the  drying  time,  adhesiveness  of  the  paint,  gloss  after  application,  and  brittleness 
or  elasticity.  It  should  be  ascertained  whether  the  paint  will  sag  in  application  and  if  it 
grips  satisfactorily  the  material  or  priming  coat  to  which  it  is  to  be  applied. 

One  of  the  important  characteristics  of  a  paint  film  is  its  elasticity  or,  conversely, 
its  tendency  to  turn  brittle  under  service  conditions.  The  elasticity  can  be  tested  in  the 
laboratory  by  applying  the  paint  on  a  thin  metal  panel  and,  after  drying,  by  bending  the 
panel  around  a  one-inch  mandrel,  coated  surface  out.  The  comparative  failures  are  evalu- 


236 


Buildings 


Fig.  17.— Scaling  Due  to  Prolonged  Neglect  of 
Hard  Type  Paints. 


ated  by  the  number  of  degrees  of  bend  the  paint  will  stand  before  failure.  The  elasticity 
of  a  paint  film  can  be  tested  after  it  has  been  in  service  by  cutting  the  surface  with  a 
sharp  knife.  If  the  paint  has  become  brittle  it  will  crack ;  if  it  is  still  elastic  only  the  sharp 
cut  will  be  observed  in  the  paint  film. 

The  drying  time  can  be  ascertained  by  preparing  a  paint  panel  and  observing  the 
time  required  for  it  to  dry  sufficiently  so  it  will  be  no  longer  tacky  to  the  touch. 

Adhesiveness  can  be  tested  after  drying  by  observing  the  resistance  offered  to 
efforts  to  scrape  the  paint  film  from  the  test  panel  with  a  sharp  edged  instrument. 

Gloss  and  sagging  can  be  noted  from  visual  observation. 


Buildings 


237 


Chemical  Analysis 

A  chemical  analysis  should  be  made  of  each  paint  sample  to  be  tested.  This  should 
show  (1)  the  percentages  by  weight  of  the  total  solids  and  the  total  liquids  and  (2)  the 
chemical  composition  of  both  the  solids  and  the  liquids  expressed  in  percentages  of  their 
constituents. 

Accelerated  Weathering  Tests 

For  some  years  accelerated  weathering  machines,  called  weatherometers,  have  been 
available  for  standard  weathering  tests  of  paints,  and  methods  of  procedure  have  been 
developed  for  their  use.  They  consist  of  apparatus  for  exposing  paint  panels  to  re- 
frigeration, wet  and  dry  conditions,  water  spray  and  artificial  sunlight  under  accurately 


Fig.  18.— Chalking  of  Paint. 


I 


238 


Buildings 


Fig.  19. — Cross-Grain  Cracking,  Caused  by  Incompatibility 
of  Paints  of  Various  Colors  Over  One  Another. 


controlled  conditions.  A  typical  accelerated  weather  testing  machine  is  shown  by 
Figures  20  and  21. 

Samples  to  be  tested  are  placed  in  a  framework  which  rotates  slowly  within  a  tank. 
The  size  of  the  test  samples  used  is  dependent  on  the  type  and  size  of  the  testing 
machine.  A  water  spray  and  hght  within  the  tank  permit  samples  to  be  subjected 
to  the  combined  effects  of  radiation  and  moisture  during  a  portion  of  each  revolution. 

In  the  accelerated  tests,  a  complete  record  must  be  maintained  of  all  weatherometer 
tests,  along  with  the  chemical  analysis  of  the  paints  tested.  Also,  each  paint  tested  in  the 
weatherometer  should  be  subjected  to  an  out-of-doors  exposure  panel  test  at  three  or 
more  locations  on  the  railroad.  This  arrangement  of  tests  will  give  not  only  the  film 
breakdown  of  the  paint,  both  from  the  weatherometer  and  the  outside  exposure  tests, 
but  also  a  record  of  the  chemical  analysis  of  each  paint  tested. 

When  one  or  a  group  of  paints  is  to  be  tested  the  panels  are  prepared  on  surfaces 
similar  to  that  on  which  the  paint  is  to  be  applied.  If  the  paint  is  to  be  used  on  wood 


Buildings 


239 


surfaces  it  is  placed  on  a  wood  panel;  if  for  use  on  metal  surfaces  it  is  placed  on  a  steel 
panel.  Paint  panel  specimens  should  be  coated  in  a  manner  as  nearly  similar  as  possible 
to  that  which  will  be  used  for  application  of  the  paint  in  practice.  For  example,  if  two 
coats  of  paint  were  to  be  applied  to  a  sand-blasted  steel  surface,  then  the  panel  should  be 
prepared  by  first  giving  it  a  light  sand  blast  and  then  applying  two  coats  with  a  proper 
drying  interval  between  the  application  of  the  coats. 

The  best  method  of  coating  panels,  when  ascertaining  the  physical  characteristics  of 
the  paint,  is  to  fasten  them  to  the  surface  to  be  painted.  The  panels  will  then  receive 
the  paint  in  a  manner  similar  to  that  employed  in  applying  paint  to  the  buildings  or 
structures  for  which  the  paint  is  being  considered.  This  eliminates  any  variable  which 
might  arise  from  the  testing  of  laboratory  prepared  panels.  After  the  test  panels  are  pre- 
pared they  are  ready  to  be  placed  in  the  weatherometer.  In  this  test  the  drum  revolves 


H 

msbwkI^^H 

^ 

i 

H^^ 

^H 

1 

^P 

£=^g^^^§ 

W 

Fig.   20. — Apparatus  for  Accelerated 
Weathering  Test. 


Fig.  21. — View  of  Apparatus  Showing 
Rotary  Sprinkler. 


the  specimens  around  the  light  and  water  spray  at  the  rate  of  approximately  IS  to  20 
min.  per  revolution. 

Many  weathering  cycles  are  employed,  but  the  cycle  recommended  is  refrigeration  1 
hour,  wet  and  dry  3J^  hours  (panel  is  sprayed  on  one  side  and  dried  by  the  light  rays 
on  the  other  as  the  drum  is  revolved) ;  rain  by  water  spray  3J^  hours,  and  sun  (artificial 
light)  16  hours.  It  must  be  clearly  understood  that  the  cycle  recommended  can  be  varied 
or  adjusted  to  suit  any  personal  ideas,  but  after  a  cycle  has  been  adopted  it  should  be 
maintained  throughout  all  the  tests  conducted,  so  that  a  proper  comparison  can  be  made 
at  all  times  with  paint  tested  in  the  past. 

The  refrigeration  test  can  be  made  in  any  refrigerator  or  cold  box  capable  of  main- 
taining a  temperature  of  10  deg.  F.,  or  lower,  to  suit  desired  conditions.  The  panels 
should  be  so  placed  in  racks  that  the  painted  surface  of  all  the  samples  will  be  exposed  to 
the  same  temperature.  This  test  can  also  be  conducted  by  placing  ice  in  the  weatherometer. 


240 Buildings 

For  light,  rain,  and  light-spray  exposure  periods  the  panels  should  be  placed  in  the 
holders  of  the  weatherometer  cylinders.  For  the  rain  period  the  lamp  should  be  raised 
above  the  cyHnder  and  the  latter  covered,  and  the  samples  sprinkled  vigorously  with 
water  by  means  of  a  rotary  spray.  During  the  light  period  the  lamp  should  be  operated 
with  the  revolving  cylinder,  and  should  shine  on  all  the  specimens  continuously. 

During  the  light  and  water  spray  period  the  light  from  the  lamp  should  shine  on 
the  specimens  continuously  while  the  water  is  running  constantly  from  a  spray  at  a 
fixed  point,  thus  wetting  the  specimens  in  the  revolving  cylinder  once  every  IS  or  20 
min.  The  position  of  the  test  specimens  in  the  revolving  cylinders  should  be  changed  for 
each  repetition  of  any  one  of  the  cycles,  especially  with  respect  to  their  location  in  the 
upper  or  lower  tiers  of  slots  or  hooks,  in  order  to  compensate  for  unavoidable  differences 
in  their  relation  to  the  light  source. 

The  panels  of  the  paint  on  test  should  be  inspected  after  each  cycle  of  weathering 
and  a  record  made  of  any  noticeable  change  in  the  paint  film  surface.  If  the  paint  film 
begins  to  check,  alligator  or  crack,  etc.,  a  suitable  record  should  be  made  of  the  number 
of  accumulated  accelerated  hours  to  the  time  of  failure. 

The  result  of  the  accelerated  weathering  test  should  be  determined  by  comparing 
specimens  of  the  unweathered  material  with  those  that  have  been  weathered.  The  dura- 
bility of  the  material  may  be  expressed  as  the  number  of  cycles  or  hours  of  accelerated 
weathering  that  were  required  to  bring  about  failure  or  definite  changes  in  the  materials 
tested. 

Outside  Exposure  Tests 

For  each  panel  prepared  for  the  weatherometer,  three  or  more  should  be  prepared 
in  the  same  manner  for  outside  exposure  tests  on  the  racks  at  three  or  more  locations  on 
the  railroad.  Each  test  panel  should  be  provided  with  a  waterproof  hood  to  cover  one- 
third  to  one-half  of  the  painted  surface.  The  purpose  of  the  hood  is  to  protect  the  cov- 
ered portion  from  the  sun  and  rain  and  other  atmospheric  conditions,  so  that  when  an 
inspection  is  made,  the  hood  may  be  removed  to  afford  a  direct  comparison  of  the 
paint  film  as  applied  and  as  weathered. 

The  outside  exposure  tests  are  slow  and  in  some  cases  are  continued  for  a  long  time. 
This  is  due  to  variations  in  light  intensity,  as  the  effect  of  sunlight  is  relatively  low 
during  a  large  portion  of  the  daylight  hours.  Exposure  racks  placed  in  locations  subject 
to  marked  climatic  changes,  will  show  wide  variations  in  results. 

Inspection  of  the  outside  exposure  panels  should  be  made  at  intervals  of  not  less 
than  three  months  nor  more  than  six  months,  and  the  condition  of  the  paint  film  surface 
compared  with  that  of  weatherometer  panels  of  the  same  samples  of  paints. 

Special  Tests 

In  testing  of  paints  many  cases  will  arise  where  the  accelerated  weathering  tests  and 
the  outside  exposure  tests  will  not  give  a  comparative  evaluation  of  the  material.  Such 
situations  call  for  special  tests  and  the  construction  of  special  apparatus.  A  few  examples 
will  give  an  idea  of  the  manner  in  which  special  tests  are  arranged  and  conducted.  How- 
ever, in  this  type  of  testing  it  should  be  borne  in  mind  that  such  tests  should  be  prac- 
tical and  as  nearly  parallel  as  possible  with  the  conditions  to  which  the  paint  will  be 
subjected  in  actual  service.  These  examples  are  as  follows: 

Sulphur  Gas  Test 

In  some  cases  it  is  necessary  to  paint  metal  structures  exposed  to  sulphur  gas.  The 
accelerated  weathering  test  furnishes  some  information  as  to  the  lasting  qualities  of  the 


Buildings 241 

paint,  but  the  outside  exposure  test  should  be  made  in  a  location  where  sulphur  gas 
contaminates  the  atmosphere,  for  example,  in  the  top  of  a  roundhouse.  Metal  panels, 
the  number  to  depend  on  the  number  of  inspections  to  be  made,  are  coated  all  over, 
including  the  edges.  They  should  be  hung  in  close  relation  with  each  other  in  top  of  the 
roundhouse.  A  predetermined  test  schedule  is  arranged  and  at  each  test  inspection  a 
panel  is  removed  and  examined  closely.  It  is  then  filed  as  information  and  not  returned 
to  its  former  location.  When  the  last  one  has  been  removed,  all  of  the  panels  can  be 
laid  down  in  a  row  and  evaluated  with  respect  to  the  period  of  time  they  were  on  test. 

Cinder  Cutting 

Where  cinder  cutting  must  be  considered,  a  test  on  top  of  a  locomotive  cab  will 
disclose  an  interesting  comparison.  The  paints  to  be  tested  are  painted  in  squares  on  the 
top  of  the  cab  roof,  which  should  be  sand  blasted  before  the  application  is  made.  During 
the  test  the  paint  squares  are  inspected  and  rated  as  to  their  condition.  This  type  of 
test  gives  not  only  the  effect  of  cinder  cutting,  but  also  an  acid  test  because  the  steam 
moisture  and  sulphur  gases  combine  to  form  dilute  sulphuric  acid. 

Abrasive  Tests 

Protective  paints  are  sometimes  considered  for  use  where  abrasion  is  the  most  im- 
portant factor.  This  statement  refers  to  coal  bins  and  other  places  where  such  materials 
are  to  be  used. 

A  simple  test  for  the  abrasive  quaUties  involves  the  use  of  a  plate  %  in.  thick  and 
about  12-in.  wide  by  18-in.  long,  each  end  of  which  is  tapered  off  at  30  deg.  The  sur- 
face to  be  coated  for  test  should  be  sand  blasted.  Not  more  than  three  paints  can  be 
tested  at  a  time  on  one  plate.  It  is  divided  into  six  parts  4  in.  wide  and  9  in.  long;  the 
three  sections  at  one  end  of  the  plate  are  coated  with  the  three  different  paints;  the 
three  sections  at  the  other  end  are  painted  with  the  same  materials  but  their  locations 
are  reversed.  The  plate  is  then  bolted  in  the  chute  of  a  coal  dock  where  it  will  be  sub- 
jected to  the  abrasive  action  of  the  moving  coal.  If  possible  to  do  so,  it  is  advisable  to 
log  the  tons  of  coal  passing  over  the  plate  for  comparison  with  other  tests  of  this 
character. 

A  laboratory  test  can  be  made  by  placing  small  coated  plates  in  a  rotating  device 
containing  small  lumps  of  coal.  The  machine  is  then  slowly  rotated  until  the  coatings 
fail,  in  a  manner  similar  to  that  occurring  in  the  test  above  described.  The  number  of 
hours  to  failure  is  recorded. 

Acid  Leaching  Test 

Protective  paint  coatings  are  sometimes  used  where  acid  leachings  or  dilute  sul- 
phuric acid  are  present.  A  test  for  exposure  of  this  type  can  be  conducted  by  means  of 
a  wooden  box  approximately  six  feet  square  and  five  feet  deep.  The  bottom  of  the  box 
is  made  of  a  heavy  metal  screen.  About  six  inches  of  coal  is  placed  on  the  screen  and 
the  coated  test  panels  laid  flat  on  this  layer  of  coal.  The  panels  are  coated  on  both  sides 
and  the  edges.  Four  feet  of  coal  is  placed  on  top  of  the  coated  plates.  Then,  each  day 
a  measured  amount  of  water  is  sprayed  on  the  coal,  allowing  this  water  to  run  through 
the  coal  down  on  the  plate  surface.  The  coal  can  be  removed  from  time  to  time  and  the 
plates  inspected  and  graded. 

In  a  test  of  this  type  it  is  of  value  to  analyze  the  coal  for  sulphur  content,  and 
also  take  samples  of  some  of  the  leachings  to  ascertain  the  acid  content.  A  laboratory 
test  can  be  conducted  to  determine  the  effect  of  acid  leachings  on  protective  coatings  by 
immersing  small  coated  steel  specimens  in  a  one  percent  sulphuric  acid  solution. 


242 Buildings 

Brine  Drippings 

The  effect  of  salt  must  be  considered  where  paint  film  coatings  are  subjected 
either  to  salt  air  or  "salt  fogs",  or  to  direct  brine  drippings.  The  salt  solutions  are  pre- 
pared so  as  to  parallel  as  nearly  as  possible  the  conditions  under  which  the  paint  is  to 
be  used.  One  cubic  centimeter  of  the  brine  solution,  of  desired  strength,  is  applied  twice 
daily  until  the  paint  film  fails.  The  panels  are  rated  with  respect  to  their  resistance  to 
the  salt  solution. 

Paint  Testing  Equipment  and  Staff 

The  paint  laboratory  should  be  estabhshed  at  a  location  close  to  the  paint  supply 
storage,  where  samples  of  all  paint  are  conveniently  accessible.  It  should  be  equipped 
with  paint  spray  apparatus  and  a  hood  ventilated  with  an  exhaust  fan.  Approved  fire 
extinguishing  equipment  is  also  important.  Glassware  test  apparatus  and  a  centrifuge  for 
analysis  of  paints  are  required.  A  weatherometer  for  testing  paint  panels  should  be 
conveniently  located  adjacent  to  the  paint  room. 

The  capacity  of  the  test  racks  for  outside  atmospheric  exposure  will  depend  upon  the 
number  of  test  panels  to  be  tested.  A  typical  yard  exposure  rack  is  shown  in  Fig.  22. 
The  test  panels  may  be  of  any  convenient  size.  However,  for  railroad  work  a  panel 
seven  by  twelve  inches  is  satisfactory,  as  it  can  be  conveniently  filed  for  future  reference 
after  the  tests  are  completed. 

Exposure  racks  of  lasting  qualities  can  be  constructed  from  angle  irons  welded  to- 
gether. They  should  be  coated  with  a  good  protective  paint.  The  racks  should  be  so 
constructed  as  to  expose  the  test  paint  panels  at  an  angle  of  45  deg.  to  the  sun,  with  a 
southern  exposure.  These  racks  can  be  located  in  a  field,  but  the  most  desirable  location 
is  on  the  roof  of  a  one  or  two-story  shop  building. 

At  least  three  outside  exposure  paint  test  racks  should  be  provided,  one  located 
close  to  the  paint  testing  department  and  the  others  at  various  locations  over  the 
railroad  where  extreme  atmospheric  conditions  may  occur. 

Special  equipment  will  have  to  be  constructed  to  meet  the  various  problems  enter- 
ing into  the  paint  testing  work.  No  specific  suggestions  regarding  the  design  of  this 
equipment  can  be  offered  to  supplement  that  given  in  each  case,  under  the  procedure 
for  making  special  tests.  It  is  necessary,  in  each  case  to  reproduce  as  nearly  as  possible 
the  conditions  under  which  the  paint  materials  are  to  be  used. 

The  staff  necessary  to  carry  on  the  investigation  will  depend  on  the  amount  of  paint 
tested.  However,  the  minimum  force  should  consist  of  a  paint  chemist  to  make  chemical 
analyses  of  the  paints  and  care  for  the  weatherometer,  and  a  paint  inspector  to  examine 
outside  exposure  panels  on  the  railroad  and  do  routine  paint  testing  work.  If  the  paint 
testing  work  is  of  sufficient  volume  the  services  of  a  clerk  will  be  required  to  assist  the 
chemist  and  inspector  with  the  records. 

Correlation  of  Test  Data 

There  has  always  been  considerable  discussion  of  the  value  of  outside  exposure  tests 
and  weatherometer  tests  of  paints,  particularly  with  respect  to  the  correlation  of  the 
results  obtained  from  both  types  of  tests  on  the  same  sample  of  paint. 

The  accelerated  weathering  testing  machine  will  not  forecast  the  life  of  a  paint  in 
terms  of  accelerated  hours  converted  into  years  of  service,  until  the  results  are  correlated 
with  actual  service  of  the  paint.  However,  pending  such  correlation  the  weatherometer 
will  give  very  useful  indications  and,  used  in  conjunction  with  other  tests,  may  serve  as  a 


Buildings 


243 


Fig.  22. — Test  Rack  for  Outside  Exposure  of  Paint  Panels. 


means  of  evaluating  the  probable  life  of  paints.  Under  controlled  conditions  it  should 
also  permit  the  determination  of  the  uniformity  of  successive  paint  deliveries. 

No  test  can  replace  the  test  of  a  paint  applied  to  a  surface  and  weathered  until 
failure.  Outside  exposure  tests  on  panels  at  locations  where  the  paint  is  to  be  applied 
would  undoubtedly  classify  the  paint,  but  such  a  test  could  not  be  completed  until  long 
after  the  selection  of  the  paint  must  be  made. 

Comparative  outside  exposure  tests  afford  the  most  ideal  method  of  predicting  the 
life  of  a  paint  at  the  locations  where  paint  is  to  be  used.  Climatic  conditions  have  a 
marked  effect  on  the  breakdown  of  a  paint  film,  so  the  exposure  tests  should  be  con- 
ducted in  each  locality  where  the  paint  is  to  be  used.  On  the  majority  of  the  railroads 
such  tests  would  not  be  practical. 


244 Buildings 

The  accelerated  weathering  machine  tests  the  paint  samples  under  fixed  conditions 
with  a  definitely  prescribed  cycle;  therefore,  tests  made  at  any  time  can  be  compared 
with  other  samples  tested  in  the  past,  if  the  same  cycle  and  conditions  are  maintained. 
This  type  of  test  gives  the  comparative  result  in  a  very  short  time  as  compared  with  the 
outside  exposure  test. 

As  an  illustration,  a  railroad  desires  to  purchase  500  gal.  of  building  paint  and  five 
manufacturers  have  submitted  samples  which  they  recommend  on  the  basis  of  their  own 
outside  exposure  tests.  If  panels  are  prepared  in  the  same  manner  for  each  manufactur- 
er's paint,  and  are  placed  in  the  weatherometer  and  tested  under  the  same  cycle  of 
weathering,  it  is  reasonable  to  assume  that  the  paint  on  the  panel  accumulating  the 
greatest  number  of  hours  without  breaking  down  would  be  the  most  acceptable  paint 
for  purchase  from  among  the  samples  tested. 

Although  the  paint  manufacturers  lean  to  the  outside  exposure  test  on  test  farms  at 
various  locations  over  the  country,  the  fact  remains  that  one  or  more  weatherometers  are 
to  be  found  in  their  paint  laboratories.  It  is  assumed  that  these  weatherometers  are  used 
for  the  purpose  of  selecting  those  paints  that  have  possibilities  for  outside  exposure  before 
being  offered  to  the  railroads. 

From  the  tests  outlined  in  the  report  four  basic  elements  have  been  developed:  The 
quick  accelerated  weathering  test;  the  outside  exposure  test  at  three  or  more  locations 
on  the  railroad,  which  takes  into  consideration  the  different  climatic  conditions  which 
may  be  encountered;  the  chemical  analysis  of  the  material;  and  the  physical  char- 
acteristics of  the  paint  being  tested.  The  question  then  arises,  will  the  field  service  test 
show  any  interesting  agreement  with  the  accelerated  weathering  tests,  and  what  part  does 
the  chemical  analysis  play  in  classifying  the  paints?  In  other  words,  after  all  of  the  data 
have  been  developed,  is  it  possible  to  correlate  them  to  bring  about  a  distinct  classification 
of   the  paints? 

The  use  of  the  same  solids  from  similar  raw  materials  and  liquids,  when  mixed  in 
the  same  proportions,  and  compounded  in  the  same  manner,  should  give  the  same  rela- 
tive life  in  the  weatherometer  and  the  outside  service  test  under  similar  climatic  conditions. 

This  correlation  can  be  best  illustrated  by  a  typical  problem.  A  paint  sample  is 
selected  for  test  and  its  physical  characteristics  are  found  suitable  for  the  type  of  mate- 
rial on  which  it  is  to  be  used.  Weatherometer  panels  are  prepared  and  tested  to  accelerated 
weathering,  and  failure  is  found  to  occur  in  2,000  hours.  The  exposure  panel  at  the 
north  end  of  the  line  showed  an  identical  failure  in  three  years,  the  panel  at  the  south 
end  of  the  railroad  failed  in  four  years,  and  the  panel  centrally  located  failed  at  three 
years.  The  average  life  from  the  outside  exposure  test  would  be  3%  years  over  the 
entire  railroad.  Then,  by  dividing  2,000  by  3%  we  find  that  606  hours  of  accelerated 
weathering  of  the  paint  tested  is  equal  to  one  year  of  average  service  on  the  railroad. 
Or,  if  desired,  the  hours  of  accelerated  test  equivalent  to  one  year's  service  can  be  worked 
out  for  the  territory  represented  by  each  field  exposure  test. 

Suggested  Method  of  Paint  Purchases 

Any  railroad  that  initiates  tests  of  the  kind  outlined  in  this  report  is  confronted 
with  the  fact  that  the  field  exposure  tests  must  be  continued  for  three  or  four  years 
before  they  would  develop  any  information  of  practical  value.  This  obstacle  may  be 
overcome  by  adopting  for  temporary  use  a  ratio  of  500  hours  of  accelerated  weathering 
to  one  year  of  average  service.  Then,  as  groups  of  tests  are  conducted  this  ratio  can  be 
raised  or  lowered  in  accordance  with  the  results  shown  by  the  exposure  panels  at  the 
various  locations  over  the  railroad. 


Buildings 245 

It  is  suggested,  when  paint  is  purchased,  that  the  bidders  furnish  a  one-gallon  sample 
of  the  paint  which  they  would  supply  if  the  contract  were  awarded  them,  and  that  an 
accelerated  weathering  test  be  conducted  under  the  same  cycle  of  weathering  on  all  of 
the  samples  furnished  by  bidders,  the  sample  resisting  failure  the  longest  being  selected 
for  purchase,  with  due  consideration  for  its  economy.  An  analysis  should  be  made  of 
the  paints  from  the  original  samples  furnished  so  that  when  the  paint  purchased  has  been 
received  a  check  analysis  can  be  made  for  comparison  with  the  original  sample. 

This  report  has  been  presented  by  your  committee  primarily  as  a  guide  for  those  who 
use  paints.  By  reason  of  the  tremendous  growth  of  the  paint  industries  and  of  the 
research  which  they  carry  on,  many  new  paint  materials  are  being  introduced  from  year 
to  year.  Therefore,  the  selection  of  paints  from  among  the  many  varieties  available  will 
have  to  be  based  on  correlated  test  data  prepared  as  correctly  as  possible. 


The  report  is  presented  as  information. 


Report  of  Committee  7 — Wood  Bridges  and  Trestles 


H.  M.  Church,  Chairman, 

H.  AUSTILL 

M.  W.  Beach 
S.  Blumenthal 

H.  F.  BOBER 

G.  M.  Cornell 

F.  H.  Cramer 

G.  S.  Crites 
D.  H.  Dowe 
S.  F.  Grear 


G.  V.  Guerin,  Jr. 
Hugh  Everett,  Jr. 
W.  E.  Hawley 
H.  C.  Heinlen 
C.  J.  HoGUE 
C.  S.  Johnson 
J.  V.  Johnston 
W.  D.  Keeney 
J.  E.  Myer 
W.  O.  Nelson 


R.  P.  Hart,  Vice-Chairman, 

J.  A.  Newlin 

W.  H.  O'Brien 

W.  A.  Oliver 

W.  L.  Peoples 

G.  W.  Rear 

Arthur  Ridgway 

W.  C.  Schakel 

L.  W.  Smith 

William  Walkden 

Com,mittee 


To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Revision  of  the  Manual. 

Progress  report  including  recommended  revisions  of  the  Manual  necessary  for  com- 
pliance with  revised  American  Lumber  Standards   page  248 

2.  Simplification  of  grading  rules  and  classification  of  timber  for  railway  uses, 
collaborating  with  other  organizations  interested. 

Progress  report — submitted  as  information    page  273 

3.  Overhead  wood  or  combination  wood  and  metal  highway  bridges,  collaborating 
with  Committee  IS — Iron  and  Steel  Structures:  Confer  with  proper  committee  of  Ameri- 
can Association  of  State  Highway  Officials. 

No  report. 

4.  Specifications  for  design  of  wood  bridges  and  trestles. 

Progress  report — submitted  as  information    page  273 

5.  Bearing  power  of  wood  piles,  with  recommendation  as  to  methods  of  determina- 
tion, collaborating  with  Committee  8 — Masonry. 

Report  on  this  assignment  presented  under  Subject  6. 

6.  Recommended  relationships  between  the  energy  of  hammer  and  the  weight  or 
mass  of  pile  for  proper  pile  driving,  to  include  concrete  piles,  collaborating  with 
Committee  8 — Masonry. 

Progress  report — submitted  as  information    page  282 

7.  Design  of  timber  structures — 

(a)  To  give  longer  life  with  lower  cost  of  maintenance. 

(b)  For  heavy  loading. 
No  report. 

8.  Fireproofing  wood  bridges  and  trestles,  including  placing  of   fire  stops. 

Final  report^ — with  recommendations  for  inclusion  in  the  Manual   page  291 

9.  Specifications  and  design  of  fastenings  for  timber  structures,  including  metal 
joint  connectors. 

No  report. 

10.  Use  of  tar  and  asphalt  compositions  for  wearing  surfaces  on  wood  floored 
highway  bridges. 

No  report. 

The  Committee  on  Wood  Bridges  and  Trestles, 

H.  M.  Church,  Chairman. 


i 


Bulletin  422,  January,  1941. 


247 


248  Wood    Bridges    and    Trestles 


Report  on  Assignment  1 
Revision  of  Manual 

R.  P.  Hart  (chairman,  subcommittee),  G.  V.  Guerin,  Jr.,  W.  E.  Hawley,  J.  V.  Johnston, 
Arthur  Ridgway,  William  Walkden. 

The  committee  reviewed  American  Lumber  Standards — Simpliiied  Practice  Recom- 
mendation R-16-39,  which  was  approved  by  the  National  Bureau  of  Standards  Octo- 
ber IS,  1939,  and  in  collaboration  with  the  AREA  representative  on  the  Central 
Committee  on  Lumber  Standards  has  approved  the  revisions,  which  are  recommended 
for  inclusion  in  the  Manual  together  with  changes  as  follows: 

Withdraw  the  Specifications  for  Wood  Shingles  appearing  on  pages  7-11  to  7-15, 
inclusive. 

Revise  the  Specifications  for  Structural  Timbers  as  set  forth  in  detail  below: 

Page  7-18,  in  the  Foreword — 

Delete  Paragraph  7,  reading  as  follows: 

7.  No  piece  of  exceptionally  light  weight  should  be  accepted  for  structural  timber  use. 

Renumber  Paragraphs  8,  9  and  10  as  Paragraphs  7,  8  and  9. 

Page  7-19,  under  I  General  Requirements — 

Add  the  following  to  Paragraph   102.  General  Quahty: 

No  pieces  of  exceptionally  light  weight  shall  be  permitted  in  any  structural  grade. 

Pitch  pockets  are  not  required  to  be  limited  in  structural  grades. 

Revise  Paragraph  104  to  read  as  follows: 

104.  Wane 

When  wane  is  permitted,  the  bark  shall  be  entirely  removed.  Wane  is  measured  at 
the  point  of  most  wane  on  any  face. 

Renumber  Paragraph  106.  Heartwood,  as  Paragraph  105. 

Delete   Paragraph    105.  Crossgrain,   and   substitute   the   following: 

106.  Slope  of  Grain 

Slope  of  grain  shall  be  measured  over  a  distance  sufficiently  great  to  determine  the 
general  slope,  disregarding  short  local  deviations. 

In  joists  and  planks,  beams  and  stringers,  slope  of  grain  is  limited  only  within  the 
middle  half  of  the  length  of  a  piece. 

In  posts  and  timbers,  slope  of  grain  is  limited  in  any  part  of  a  piece. 

Pages  7-20  to   7-23,  inclusive — 

Withdraw  Paragraphs  107  to  121,  inclusive,  and  replace  with  the  following  new 
Paragraphs  107  to  ISO,  inclusive: 

Density 

107.  The  following  methods  for  determining  density  of  Douglas  fir  and  southern 
pine  are  for  use  with  the  grades  where  density  is  required. 

108.  Dense  Douglas  fir  and  southern  pine  shall  average  on  either  one  end  or  the 
other  not  less  than  6  annual  rings  per  inch,  and,  in  addition,  one-third  or  more  summer- 
wood  (the  darker,  harder  portion  of  the  annual  ring)  over  a  3-inch  portion  of  a  radial 
line  located  as  described  below.  The  contrast  in  color  between  summerwood  and  spring- 
wood  shall  be  distinct. 

109.  Pieces  averaging  less  than  6  annual  rings  per  inch  shall  be  accepted  as  dense 
if  averaging  one-half  or  more  summerwood. 


Wood    Bridges    and    Trestles  249 

110.  In  inspection  for  density,  reasonable  variation  of  opinion  between  inspectors 
must  be  recognized.  In  reinspection  of  a  particular  lot  of  lumber  for  density,  for  every 
three  pieces  accepted  as  having  one-third  or  more  summerwood,  one  of  the  remaining 
pieces  shall  be  accepted  if  agreed  upon  as  having  between  30  and  33%  percent 
summerwood. 

Radial  Line 

111.  The  radial  line  shall  be  representative  of  the  average  growth  on  the  cross 
section. 

112.  When  the  radial  line  specified  is  not  representative,  it  shall  be  shifted  suffi- 
ciently to  present  a  fair  average,  but  the  distance  from  the  pith  to  the  beginning  of  the 
3-inch  portion  of  the  line  in  boxed-pith  pieces  shall  not  be  changed. 

113.  In  case  of  disagreement,  two  radial  lines  shall  be  chosen,  and  the  number  of 
rings  per  inch  and  percentage  of  summerwood  shall  be  the  average  of  these  lines. 

Location  of  Radial  Line  in  Douglas  Fir  and  Redwood 

114.  In  boxed-pith  pieces  the  radial  line  shall  run  front  the  pith  to  the  corner 
farthest  from  the  pith.  When  the  least  dimension  is  6  inches  or  less,  the  3-inch  portion 
of  the  hne  shall  begin  at  a  distance  of  1  inch  from  the  pith.  When  the  least  dimension  is 
more  than  6  inches,  the  3-inch  portion  of  the  hne  shall  begin  at  a  distance  from  the 
pith  equal  to  one-fourth  the  least  dimension  of  the  piece. 

lis.  In  pithless  pieces  the  center  of  the  3-inch  portion  of  the  radial  hne  shall  be 
at  the  center  of  the  end  of  the  piece. 

116.  If  a  3 -inch  portion  of  a  radial  line  cannot  be  obtained,  the  measurement  shall 
be  made  over  as  much  of  a  3-inch  portion  as  is  available. 

Location  of  Radial  Line  in  Southern  Pine 

117.  In  boxed-pith  pieces  the  measurement  shall  be  made  over  the  third,  fourth, 
and  fifth  inches  from  the  pith  along  the  radial  line. 

118.  In  pieces  containing  the  pith,  but  not  a  S-inch  radial  line,  which  are  less  than 

2  by  8  inches  in  section  or  less  than  8  inches  in  width,  that  do  not  show  over  16  square 
inches  on  the  cross  section,  the  inspection  shall  apply  to  the  second  inch  from  the  pith. 
In  larger  pieces  that  do  not  show  a  S-inch  radial  line,  the  inspection  shall  apply  to  the 

3  inches  farthest  from  the  pith. 

119.  In  cases  where  pieces  do  not  contain  the  pith  and  it  is  impossible  to  locate  it 
with  any  degree  of  accuracy,  the  same  inspection  shall  be  made  over  3  inches  on  an 
approximate  radial  hne  beginning  at  the  edge  nearest  the  pith  in  pieces  over  3  inches  in 
thickness,  and  on  the  second  inch  nearest  the  pith  in  pieces  3  inches  or  less  in  thickness. 

Close  Grain 

120.  The  following  methods  for  determining  rate  of  growth  of  Douglas  fir  and 
redwood  are  for  use  with  grades  where  close  grain  is  required. 

121.  Close-grained  Douglas  fir  shall  average  on  either  one  end  or  the  other  not  less 
than  6  nor  more  than  20  annual  rings  per  inch,  over  a  3-inch  portion  of  a  radial  Une 
located  as  described  below. 

122.  Pieces  averaging  S  rings  or  more  than  20  shall  be  accepted  as  equivalent  of 
close  grain  if  having  one-third  or  more  summerwood. 

123.  Close-grained  redwood  shall  average  on  either  one  end  or  the  other  not  less 
than  10  nor  more  than  3S  annual  rings  per  inch,  over  a  3-inch  portion  of  a  radial  Hne 
located  as  described  below. 


250 Wood    Bridges    and    Trestles 

Holes 

124.  Holes  from  knots  and  from  causes  other  than  knots  are  measured  and  limited 
as  are  knots. 

Faces  and  Edges 

125.  The  faces  of  a  piece  of  lumber  are  the  four  longitudinal  surfaces  of  the  piece, 
sometimes  further  designated  as  "wide"  faces  or  "narrow"  faces. 

126.  The  edges  of  a  piece  of  lumber  are  understood  to  be  the  narrower  faces,  and 
the  sides  the  wider  faces.  In  describing  the  locations  of  knots  and  other  grade  limitations 
in  structural  lumber,  however,  the  edges  of  a  given  face  are  understood  to  be  the 
intersection  of  two  adjacent  faces,  commonly  called  corners. 

127.  In  a  piece  of  lumber  graded  for  use  in  bending,  wide  faces  shall  be  taken  as 
vertical  faces,  and  narrow  faces  as  horizontal  faces,  unless  otherwise  specified. 

128.  When  the  faces  of  structural  lumber,  5  by  5  inches  and  larger,  are  of  equal 
nominal  width,  grades  for  posts  and  timbers  shall  be  used,  unless  otherwise  specified. 
When  such  faces  are  of  unequal  nominal  width,  grades  for  beams  and  stringers  shall  be 
used,  unless  otherwise  specified. 

Knots 

129.  Knots  crossing  the  corners  of  pithless  pieces  which  do  not  extend  beyond  the 
area  of  permissible  wane  are  not  considered. 

130.  Cluster  knots  are  not  permitted  in  structural  grades. 

Knots  in  Joists  and  Planks 

131.  In  joists  and  planks  the  only  knots  measured  on  narrow  faces,  except  knots 
that  cross  the  corners  of  pithless  pieces,  are  those  which  do  not  show  on  wide  faces,  and 
their  size  is  the  distance  between  lines  enclosing  the  knot  and  parallel  to  the  edges  of  the 
piece. 

132.  On  wide  faces  the  size  of  knot  is  its  average  diameter,  except  that  knots  which 
cross  the  corners  of  pithless  pieces  and  contain  the  intersections  of  adjacent  faces  shall 
be  measured  only  on  the  end  appearing  on  the  face  containing  the  shorter  portion,  and 
knots  which  extend  entirely  across  a  face  shall  be  measured  at  both  ends,  both  measure- 
ments between  lines  enclosing  the  knot  and  parallel  to  the  edges  of  the  piece. 

133.  The  size  of  knots  on  narrow  faces  and  at  edges  of  wide  faces  may  increase 
proportionately  from  the  size  permitted  in  the  middle  third  of  the  length  to  twice  that 
size  at  the  ends  of  the  piece. 

134.  The  size  of  knots  on  wide  faces  may  increase  proportionately  from  the  size 
permitted  at  the  edge  to  the  size  permitted  along  the  center  line. 

135.  The  sum  of  the  sizes  of  all  knots  within  the  middle  half  of  the  length  of  any 
face,  measured  as  specified  by  paragraphs  131  and  132  for  the  face  under  consideration, 
shall  not  exceed,  in  a  piece  16  feet  long,  four  and  one-half  times  the  size  of  the  largest 
knot  allowed  on  that  face.  In  other  lengths  this  sum  shall  not  exceed  the  sum  per- 
mitted in  the  16-foot  length  multiplied  by  the  fraction  (L  -\-  16)/32,  where  L  =  length 
in  feet.  In  pieces  longer  than  16  feet  the  sum  of  the  sizes  of  the  knots  within  any 
8-foot  portion  of  the  middle  half  of  the  length  shall  not  exceed  four  and  one-half  times 
the  largest  knot  allowed  on  that  face. 

Knots  in  Beams  and  Stringers 

136.  In  beams  and  stringers,  the  size  of  a  knot  on  a  narrow  face  is  the  distance 
between  lines  enclosing  the  knot  and  parallel  to  the  edges  of  the  piece,  except  that  when 
the  knot  extends  into  the  adjacent  fourth  of  the  wide  face  the  smallest  diameter  is  its 


Wood    Bridges   and   Trestles 251 

size.  The  size  of  a  knot  on  the  wide  face  is  its  smallest  diameter,  but  at  the  edges  the 
size  is  limited  as  on  the  narrow  face. 

137.  Knots  which  cross  the  corners  of  pithless  pieces  and  contain  the  intersections 
of  adjacent  faces  shall  be  measured  only  at  the  end  appearing  on  the  face  containing  the 
shorter  portion;  knots  which  extend  entirely  across  a  face  shall  be  measured  at  both 
ends,  both  measurements  between  Unes  enclosing  the  knot  and  parallel  to  the  edges  of 
the  piece. 

138.  The  size  of  knots  on  narrow  faces  and  at  edges  of  wide  faces  may  increase  pro- 
portionately from  the  size  permitted  in  the  middle  third  of  the  length  to  twice  that  size 
at  the  ends  of  the  piece,  except  that  the  size  of  no  knot  shall  exceed  the  size  permitted 
along  the  center  line  of  the  wide  face. 

139.  The  size  of  knots  on  wide  faces  may  increase  proportionately  from  the  size 
permitted  at  the  edge  to  the  size  permitted  along  the  center  line. 

140.  The  sum  of  the  sizes  of  all  knots  within  the  middle  half  of  the  length  of  any 
face,  measured  as  specified  by  paragraph  136,  for  the  face  under  consideration,  shall 
not  exceed,  in  a  piece,  16  feet  long,  four  times  the  size  of  the  largest  knot  allowed  on 
that  face.  In  other  lengths  this  sum  shall  not  exceed  the  sum  permitted  in  the  16-foot 
length  multiplied  by  the  fraction  (L  +  16)/32,  where  L  =:  length  in  feet.  In  pieces 
longer  than  16  feet  the  sum  of  the  sizes  of  the  knots  within  any  8-foot  portion  of  the 
middle  half  of  the  length  shall  not  exceed  four  times  the  largest  knot  allowed  on  that  face. 

Knots  in  Posts  and  Timbers 

141.  In  posts  and  timbers,  the  size  of  a  knot  at  any  point  on  any  face  is  its  average 
diameter,  except  that  knots  which  cross  the  corners  of  pithless  pieces  and  contain  the 
intersections  of  adjacent  faces  shall  be  measured  only  at  the  end  appearing  on  the  face 
containing  the  shorter  portion,  and  knots  which  extend  entirely  across  a  face  shall  be 
measured  at  both  ends,  both  measurements  between  Hnes  enclosing  the  knot  and  parallel 
to  the  edges  of  the  piece. 

142.  The  sum  of  the  sizes  of  all  knots  in  any  6  inches  of  the  length  of  a  piece, 
measured  as  specified  in  paragraph  141,  shall  not  exceed  twice  the  maximum  permissible 
size  of  knot.  Two  knots  of  maximum  permissible  size  are  not  allowed  in  the  same  6  inches 
of  length  on  any  face. 

Shakes,  Checks,  and  Splits 

143.  The  sum  of  the  sizes  of  shakes,  checks,  splits,  or  any  combination  thereof  shall 
not  exceed  the  permissible  size  of  shake. 

144.  Checks  extending  entirely  across  the  end  within  the  middle  half  of  the  height 
shall  not  extend  into  the  piece  at  the  center  of  the  width  at  the  end  a  distance  greater 
than  the  size  of  the  allowable  shake. 

Shakes  in  Joists  and  Planks,  Beams  and  Stringers 

145.  Shakes  are  measured  at  the  ends  of  a  piece.  Only  those  within  the  middle  half 
of  the  height  of  the  piece  are  considered.  (Height  equals  width  of  wide  face.)  The  size 
of  a  shake  is  the  distance  between  lines  enclosing  the  shake  and  parallel  to  the  wide  faces 
of  the  piece.  The  permissible  size  is  determined  by  the  width  of  the  narrow  face  of  the 
piece. 

Shakes  in  Posts  and  Timbers 

146.  The  size  of  a  shake  is  the  greater  dimension  of  a  rectangle  enclosing  the  shake 
and  having  its  sides  parallel  to  the  faces  of  the  piece. 


252 


Wood    Bridges    and    Trestles 


Checks  and  Splits  in  Joists  and  Planks,  Beams  and  Stringers 

147.  The  limitations  apply  to  both  ends  but  only  within  the  middle  half  of  the 
height  of  a  piece  and  within  three  times  the  height  from  the  end.  (Height  equals  width 
of  wide  face.)  The  size  of  checks  within  this  portion  of  a  piece  shall  be  their  estimated 
area,  along  the  horizontal  section  showing  maximum  area,  divided  by  three  times  the 
height  of  the  piece.  When  checks  on  two  parallel  faces  are  opposite  or  approximately  so, 
the  sum  of  their  sizes  is  taken. 

Checks  and  Splits  in  Posts  and  Timbers 

148.  Size  of  checks  shall  be  the  sum  of  seven  depth  measurements,  one  on  the  end 
and  three  on  each  of  two  sides,  divided  by  3.  Each  measurement  shall  be  the  greatest 
depth  of  any  check  within  the  above-specified  portion  of  the  piece ;  the  measurement 
on  the  end  made  at  the  middle  of  the  width  of  the  piece  and  the  six  measurements  on  the 
sides  at  1,  2  and  3  times  the  height  of  the  piece  from  the  end  in  joist,  plank,  beams  and 
stringers,  and  the  width  of  the  piece  from  the  end  in  posts  and  timbers.  Each  depth  meas- 
urement shall  be  determined  by  the  penetration  into  the  piece  of  a  probe  <h  inch  thick  and 
%  inch  wide. 

Dimensions 

149.  The  standard  sizes  of  structural  timbers  are  as  shown  in  the  following  table: 

Joists  and  Beams  and  Posts  and 

Planks  Stringers  Timbers 

Nominal  thickness 2"    to    but    not  5"  or  more  S"  or  more 

including  5" 

Nominal  width    4"  or  more  8"  or  more  5"  or  more 

Standard  length    Multiples  of  2'       Multiples  of  2'       Multiples  of  2' 

Sizes  in  fractional  inches  or  odd  feet  are  special  cutting. 

Tolerances  and  Surfacing  Allowances 

150.  The  actual  dimensions  of  structural  timbers  when  green  shall  conform  to  the 
following  tolerances  and  surfacing  allowances. 


Minimum*  Surfaced  Minimum*   Surfaced 

Nominal      Rough      Thickness    Nominal      Rough         Width 
Thickness  Thickness  SIS  or  S2S     Width 


Width     SlEorSZE 


Joists,  planks  and  other  2"  ^"  off  Yf,"  off            4" 

framing    members    with  3"  fn"  off            do                6" 

load    applied    to    either  4"  do                do  8"  &  wdr. 
wide  face  or  narrow  face. 


■\s"  off 

do 

y4"  off 


^"off 

do 
K"  off 


Beams,     stringers     and  5",  6"  do  ^"  off 

other   heavy   members  8"  and         34"  off  do 

with    load    applied    to  thicker 
narrow   face. 


8"  &  wdr. 


do 


do 


Posts,  timbers  and  other 
members  to  carry  longi- 
tudinal loads. 


S" 

6" 
8"  and 
thicker 


-h"  off 

do 
%"  off 


y%"  off 
y^"  off 

do 


S" 

6" 

8"  &  wdr. 


T%"0ff 

do 

yc  off 


Permissible  in  not  to  exceed  20  percent  of  the  pieces  in  any  one  shipment. 


y?,"  off 

3^"  off 
do 


Wood    Bridges    and    Trestles 253 

Pages  7-23  and  7-24 

Renumber  Paragraphs  122  to  128,  inclusive,  as  Paragraphs  151  to  157,  inclusive. 

Page  7-69 

Delete  bold  face  heading: 

GRADING  RULES  AND  CLASSIFICATION  OF  TIMBER  AND 
LUMBER  FOR  RAILWAY  USES 

and  replace  with  the  following: 

NOMENCLATURE  OF  COMMERCIAL  DOMESTIC  SOFTWOODS 
AND  HARDWOODS 

1940 

Revise  Paragraph  heading  101  reading — 

101.  Nomenclature  of  Commercial  Domestic  Softwoods 
to  read: 

501.  Softwoods 

Page  7-71 

Revise  Paragraph  102  reading — 

102.  Nomenclature  of  Commercial  Domestic  Hardwoods 
to  read: 

502.  Hardwoods 

Pages  7-73  to  7-80,  inclusive 

Withdraw  the  heading  II  CLASSIFICATIONS  and  all  of  the  material  following  on 
pages  7-74  to  7-80  inclusive,  and  substitute  the  following  matter: 

DEFINITIONS  OF  TERMS  USED  IN  DESCRIBING  STANDARD 
GRADES  FOR  LUMBER 
601.  Definitions 

The  commonly  recognized  characteristics  and  conditions  occurring  in  lumber  are: 

Bark  pockets 

Bird's-eye 

Checks 


Cross  breaks 

Cross  grain 

Decay 

Gum  spots  and  streaks,  etc. 

Holes 

Knots 

Mismanufacture 

Pitch 


Pitch  pockets 

Pitch  seams 

Pitch  streaks 

Pith 

Pith  flecks 

Shake 

Sphts 

Stain 

Wane 

Warp 


advanced  (or  typical)  decay.  See  decay. 

air  dried.  Seasoned  by  exposure  to  the  atmosphere,  in  the  open  or  under  cover,  without 

artificial  heat. 
all-heart.  Of  heartwood  throughout;  that  is,  free  of  sapwood. 


254  Wood    Bridges    and    Trestles 

American  standard  lumber.  See  paragraph  830. 

annual  ring.  Growth  layer  put  on  in  a  single  growth  year. 

bark  pocket.  Patch  of  bark  partially  or  wholly  enclosed  in  the  wood;  classified  as  are 

pitch  pockets. 
bastard  sawn.  With  annual  rings  which  form  angles  of  30°  to  60°  with  the  surface  of 

the  piece. 
beam.  Lumber  of  rectanguler  cross  section,  graded  with  respect  to  its  strength  in  bend- 
ing when  loaded  on  the  narrow  face.  Nominal  thicknesses:    S   or  more  inches; 

Nominal  widths:  8  or  more  inches.  Standard  sizes:  SlS,  SlE,  S2S,  or  S4S,  J^  inch 

off  each  way.  Standard  lengths:  Multiples  of  2  feet. 
bird's-eye.  Small  central  spot  with  the  wood  fibers  arranged  around  it  in  the  form  of  an 

ellipse,  so  as  to  give  the  appearance  of  an  eye.  Not  objectionable,  unless  unsound 

or  hollow. 
blemish.  Anything  marring  the  appearance  of  lumber  which  is  not  classifiable  as  a  defect. 
board.  See  paragraphs  802  and  848. 
bow.  See  warp. 

boxed  pith.  When  the  pith  is  between  the  four  faces  on  an  end  of  a  piece.. 
branch  knot.  See  knot. 
break.  See  cross  break. 
bright  (sapwood).  Unstained. 
broadleaved.  See  hardwood. 

burl.  Distorted  grain  surrounding  the  piths  of  several  buds  which  did  not  develop. 
burn.  See  machine  burn. 
butted.  Sawed  square  at  the  ends. 
characteristics.  Distinguishing  features  which  by  their  extent  and  number  determine  the 

quality  of  a  piece  of  lumber. 
check  (seasoning).  Lengthwise  separation  of  the  wood,  most  of  which  occurs  across  the 

rings  of  annual  growth. 
surface  check.  Occurs  on  a  surface  of  a  piece. 

small  surface  check.  Perceptible  opening  not  over  4  inches  long. 

medium  surface  check.  Not  over  s's  inch  wide  and  over  4,  but  not  over  10  inches 
long. 

large  surface  check.  Over  g^  inch  wide  and  over  10  inches  long. 
end  check.  Occurs  on  an  end  of  a  piece. 
through  check  (split).  Extends  from  one  surface  through  the  piece  to  the  opposite 

surface  or  to  an  adjoining  surface. 
heart  check.  See  shake. 
chipped  grain.  Area  where  the  surface  is  chipped  or  broken  out  in  very  short  particles 

below  the  line  of  cut.  Not  classed  as  torn  grain  and,  as  usually  found,  is  not 

considered  unless  in  excess  of  25  percent  of  the  surface  involved. 
clear.  Free  of  all  blemishes,  characteristics,  or  defects. 
close  grain.  See  paragraphs  120,  123. 
closed  pitch  pocket.  See  pitch  pocket. 
coarse  grain.  Wide  annual  rings,  or  rings  made  conspicuous  by  considerable  difference  in 

proportions  of  springwood  and  summerwood. 
common  lumber.  See  paragraph  844. 
conifer.  See  softwood. 
crook.  See  warp. 
cross  break.  Separation  of  the  wood  cells  across  the  grain,  such  as  may  be  due  to  tension 

resulting  from  unequal  shrinkage  or  mechanical  stress. 


Wood    Bridges   and    Trestles  255 


cross  cutting.  See  cutting. 

cross  grain  (slope  of  grain).  Deviation  of  the  fiber  from  a  line  parallel  to  the  sides  of 

the  piece.  Cross  grain  may  be  diagonal,  spiral,  or  both. 
slight  cross  grain.  Slope  of  grain  not  over  1  inch  in  a  length  of  15  inches. 
medium  cross  grain.  Slope  of  grain  over  1  inch  in  a  length  of  IS  inches,  but  not  over 

1  inch  in  a  length  of  10  inches. 
steep  cross  grain.  Slope  of  grain  over  1  inch  in  a  length  of  10  inches. 
cross  grain   (shingles).  Deviation  of  the  fiber  from  the  longitudinal  axis  of  the  shingle. 

See  paragraph  868. 
cup.  See  WARP. 
cup  shake.  See  shake. 
cutting.  The  portion  of  a  board  or  plank  obtained  by  sawing  it  crosswise  or  lengthwise, 

or  both  ways,  which  is  then  flat  enough  to  be  surfaced  on  both  sides  to  standard 

thickness  and  which  has  straight  edges. 
decay.  Disintegration  of  wood  substance  due  to  action  of  wood-destroying  fungi.  Also 

known  as  dote  and  rot. 
advanced  (or  typical)  decay.  Older  stage  of  decay  in  which  disintegration  is  readily 

recognized  because  the  wood  has  become  punky,  soft,  and  spongy,  stringy,  shaky, 

pitted,  or  crumbly.  Decided  discoloration  or  bleaching  of  the  rotted  wood  is  often 

apparent. 
incipient  decay.  Early  stage  of  decay  in  which  disintegration  has  not  proceeded  far 

enough   to    soften    or   otherwise   change    the   hardness    of   the   wood   perceptibly. 

Usually  accompanied  by  a  slight  discoloration  or  bleaching  of  the  wood. 
pocket  rot.  Typical  decay  which  appears  in  the  form  of  a  hole,  pocket,  or  area  of 

soft  rot,  usually  surrounded  by  apparently  sound  wood. 
water  soak   or  stain.  Water-soaked   area   in  heartwood,   usually   interpreted   as   the 

incipent  stage  of  certain  wood  rots. 
defect.  Any  irregularity  in  or  on  wood  that  may  lower  its  durability,  strength,  or  utility 

value. 
de-grades.  Pieces  which  on  reinspection  prove  of  lower  quality  than  the  grade  in  which 

they  were  shipped. 
density  rules.  See  paragraphs  107,  110. 
diagonal  grain  (lumber).  See  cross  grain. 
diagonal  grain  (shingles).  Deviation  of  the  grain  from  a  line  parallel  to  the  edges  of  the 

shingle.  See  paragraph  869. 
dimension.  See  paragraphs  802  and  848. 
discoloration.  See  stain. 
dote.  See  decay. 

double  end  trimmed.  Sawed  square  at  both  ends. 
dressed  lumber.  See  paragraph  804,  Surfaced. 
dry.  Not  green.  See  air  dried,  kiln  dried,  moisture  content,  seasoning,  and  smoke 

DRIED. 

edge.  See  paragraph  126. 

edge  grain  (vertical  grain).  Annual  rings  (so-called  grain)   which  form  an  angle  of  45° 

or  more  with  the  surface  of  the  piece.  See  also  flat  grain. 
encased  knot.  See  knot. 
end  check.  See  check. 
face.  See  paragraphs  125,  128. 
firm  knot.  See  knot. 


256 Wood    Bridges    and    Trestles 

firm  red  heart.  A  stage  of  incipient  decay  characterized  by  a  reddish  color  in  the  heart- 
wood,  which  does  not  unfit  the  wood  for  the  majority  of  yard  purposes. 

fiat  grain  (slash  grain).  Annual  rings  (so-called  grain)  which  form  an  angle  of  less  than 
45°  with  the  surface  of  the  piece.  See  also  edge  grain. 

fleck.  See  pith  fleck. 

gouge.  See  machine  gouge. 

grain.  See  chipped,  coarse,  cross,  diagonal,  edge,  flat,  loosened,  mixed,  raised,  spiral, 
STRAIGHT,  and  torn  grain. 

green.  Unseasoned;  not  dry. 

gum  pocket.  Well-defined  opening  between  rings  of  annual  growth  which  usually  con- 
tains, or  did  contain,  more  or  less  gum;  classified  as  are  pitch  pockets.  Bark  also 
may  be  in  the  pocket. 

gum  seam.  Check  or  shake  filled  with  gum. 

gum  spot.  Accumulation  of  gumlike  substance  occurring  as  a  small  patch.  May  occur  in 
conjunction  with  a  bird-peck  or  other  injury  to  the  growing  wood. 

gum  streak.  Well-defined  accumulation  of  gum  in  a  more  or  less  regular  streak;  classified 
as  are  pitch  streaks. 

hard  rot.  See  incipient  decay. 

hardwood.  One  of  the  group  of  trees  which  have  broad  leaves.  The  term  has  no  refer- 
ence to  the  hardness  of  the  wood. 

heart  check.  See  pith  shake. 

heart  face.  Face  side  free  of  sapwood. 

heart,  red.  See  firm  red  heart. 

heart  shake.  See  pith  shake. 

heartwood.  Inner  core  of  the  tree  trunk  comprising  the  annual  rings  containing  nonliving 
elements;   usually  darker  in  color  than  sapwood. 

hit  and  miss.  Series  of  surfaced  areas  with  skips  not  over  tV  inch  deep  between  them. 

hit  or  miss.  To  skip  or  surface  a  piece  for  a  part  or  the  whole  of  its  length,  provided  it 
is  nowhere  more  than   iV  inch  scant. 

holes.  Holes  may  extend  partially  or  entirely  through  a  piece  and  be  from  any  cause. 
To  determine  the  size  of  a  hole,  average  the  maximum  and  minimum  diameters, 
unless  otherwise  specified. 
pin  hole.  Not  over  tV  inch  in  diameter. 

medium  hole.  Over  iV  inch,  but  not  over  %  inch  in  diameter. 
large  hole.  Over  %  inch  in  diameter. 

hollow  knot.  See  knot. 

incipient  decay.  See  decay. 

industrial  lumber.  See  paragraphs  848,  850. 

intergrown  knot.  See  knot. 

joists.  Lumber  of  rectangular  cross  section,  graded  with  respect  to  its  strength  in  bend- 
ing when  loaded  either  on  the  narrow  face  as  joist  or  on  the  wide  face  as  plank. 
Nominal  thicknesses:  2  inches  to,  but  not  including,  5  inches.  Nominal  widths: 
4  or  more  inches.  Standard  thicknesses:  SlS  or  S2S,  J^  inch  off.  Standard  widths: 
4  to  7  inches  SlE  or  S2E,  -j/g  inch  off;  8  or  more  inches  wide  SIE  or  S2E,  yi  inch 
off.  Standard  lengths:  Multiples  of  2  feet. 

kiln  dried.  Seasoned  in  a  chamber  by  means  of  artificial  heat. 

knot.  Branch  or  hmb,  embedded  in  the  tree  and  cut  through  in  the  process  of  lumbei 
manufacture;  classified  according  to  size,  quality,  and  occurrence.  To  determine 
the  size  of  a  knot,  average  the  maximum  length  and  maximum  width,  unless 
otherwise  specified. 


Wood    Bridges    and    Trestles 257 

knot  size: 

pin  knot.  Not  over  y^  inch  in  diameter. 
small  knot.  Over  J^  inch,  but  not  over  ^  inch  in  diameter. 
medium  knot.  Over  ^4  inch,  but  not  over  IJ^  inches  in  diameter. 
large  knot.  Over  IJ/2  inches  in  diameter. 
knot  quality: 

decayed  knot.  Softer  than  the  surrounding  wood,  and  containing  advanced  decay. 
encased  knot.  Its  rings  of  annual  growth  are  not  intergrown  with  those  of  the  sur- 
rounding wood.  The  encasement  may  be  partial  or  complete;  of  pitch  or  bark. 
hollow  knot.  Apparently  sound  and  having  in  it  a  hole  over  %  inch  in  diameter. 
intergrown  knot.  Its  rings  of  annual  growth  are  completely  intergrown  with  those 

of  the  surrounding  wood. 
loose  knot.  Not  held  tightly  in  place  by  growth  or  position,  and  cannot  be  relied 

upon  to  remain  in  place. 
unstable  knot.  Will  hold  its  place  in  a  dry  piece  under  ordinary  conditions;  can  be 

moved  under  pressure,  though  not  easily  pushed  out. 
pith  knot.  Sound  knot  having  pith  hole  not  over  ^  inch  in  diameter. 
sound  knot.  Solid  across  its  face,  as  hard  as  the  surrounding  wood,  and  showing  no 

indications  of  decay.  May  vary  in  color  from  red  to  black. 
star-checked  knot.  Having  radial  checks. 

tight  knot.  So  fixed  by  growth  or  position  as  to  retain  its  place. 
firm  knot.  Solid  across  its  face,  but  containing  incipient  decay. 

water-tight  knot.  Its  rings  of  annual  growth  are  completely  intergrown  with  those 
of  the  surrounding  wood  on  one  surface  of  the  piece,  and  it  is  sound  on  that 
surface. 
knot  occurrence: 

branch  knots.  Two  or  more  divergent  knots  sawed  lengthwise  and  tapering  toward 

the  pith  at  a  common  point. 
corner  knot  (in  structural  lumber  only).  Contains  the  intersection  of  adjacent  faces; 

measured  only  as  provided  in  paragraphs  131,  132,  137,  141. 
knot  cluster.  Two  or  more  knots  grouped  together,  the  fibers  of  the  wood  being 

deflected  around  the  entire  unit.  A  group  of  single  knots  is  not  a  knot  cluster. 
single  knot.  Occurs  by  itself,  the  fibers  of  the  wood  being  deflected  around  it. 
loose  knot.  See  knot. 

loosened  grain.  Small  portion  of  the  wood  loosened  but  not  displaced. 
lumber.  See  general,  under  American  Lumber  Standards  for  Softwood  Lumber. 
machine  burn.  Darkening  or  charring  due  to  overheating  by  machine  knives. 
machine  gouge.  Groove  due  to  the  machine  cutting  below  the  desired  line  of  cut. 
massed  pitch.  See  pitch. 
matched  lumber.  See  paragraph  804. 
miscut  lumber.  That  having  a  greater  variation  in  thickness  or  width  at  different  places 

on  the  piece  than  that  specified  for  variation  in  sawing. 
mismamifacture.  Includes  all  defects  or  blemishes  produced  in  manufacturing.  See  chipped 
grain,  hit  and  miss,  hit  or  miss,  loosened  grain,  machlne  burn,  machine 

GOUGE,  miscut  LUMBER,  MISMATCHED  LUMBER,  RAISED  GRAIN,  SKIP,  TORN  GRAIN,  and 
variation    in    SAWING. 

mismatched  lumber.  Worked  lumber  that  does  not  fit  tightly  at  all  points  of  contact 
between  adjoining  pieces,  or  in  which  the  surfaces  of  adjoining  pieces  are  not  in 
the  same  plane. 
slight  mismatch.  Surface  variation  not  over  u'?  inch. 


258 Wood    Bridges    and    Trestles 

medium  mismatch.  Surface  variation  over  ^,  but  not  over  5*2  inch. 
heavy  mismatch.  Surface  variation  over  s'2  inch. 
mixed  grain.  Any  combination  of  edge  grain  and  fiat  grain. 
moisture  content.  Weight  of  the  water  in  wood  expressed  in  percentage  of  the  weight  of 

oven-dry  wood. 
patterned  lumber.  See  paragraph  804. 
peck   (found  in  cedar  and  cypress).  Channeled  or  pitted  areas  or  pockets  of  localized 

decay. 
pecky.  Characterized  by  peck. 
pin  hole.  See  hole. 
pin  knot.  See  knot. 

pitch.  Accumulation  of  resin  in  the  wood  cells  in  a  more  or  less  irregular  patch. 
light  pitch.  Lightly  evident  presence  of  pitch. 

medium  pitch.  Trace  of  pitch  slightly  more  evident  than  light  pitch. 
heavy  pitch.  Very  evident  presence  of  pitch  showing  by  its  color  and  consistency. 
massed  pitch.  Clearly  defined  accumulation  of  solid  pitch  in  a  body  by  itself. 
pitch  pocket.  Well-defined  opening  between  rings  of  annual  growth,  usually  containing, 
or  which  has  contained,  more  or  less  pitch,  either  solid  or  liquid.  Bark  also  may  be 
present  in  the  pocket. 
very  small  pitch  pocket.  Not  over  ^  inch  in  width  and  not  over  2  inches  in  length. 
small  pitch  pocket.  Not  over  %  inch  in  width  and  not  over  4  inches  in  length;  or 

not  over  %  inch  in  width  and  not  over  2  inches  in  length. 
medium  pitch  pocket.  Not  over  %  inch  in  width  and  not  over  8  inches  in  length; 

or  not  over  ^  inch  in  width  and  not  over  4  inches  in  length. 
large  pitch  pocket.  Width  or  length  exceeds  the  maximum  permissible  for  a  medium 

pitch  pocket. 
closed  pitch  pocket.  Does  not  show  an  opening  on  both  sides  of  the  piece. 
open  (through)  pitch  pocket.  Is  cut  across  on  both  sides  of  the  piece. 
pitch  seam.  Shake  or  check  filled  with  pitch. 
pitch  streak.  Well-defined  accumulation  of  pitch  in  a  more  or  less  regular  streak. 

small  pitch  streak.  Not  over  one-twelfth  the  width  by  one-sixth  the  length  of  the 

surface  on  which  it  occurs. 
medium  pitch  streak.  Over  one-twelfth,  but  not  over  one-sixth  the  width  by  over 

one-sixth  but  not  over  one-third  the  length  of  the  surface  on  which  it  occurs. 
large  pitch  streak.  Over  one-sixth  the  width  by  one-third  the  length  of  the  surface 
on  which  it  occurs. 
pith.  Small  soft  core  in  the  structural  center  of  a  log. 

boxed  pith.  When  the  pith  is  within  the  four  faces  on  an  end  of  a  piece. 
pith  fleck.  Narrow  streak  resembUng  pith  on  the  surface  of  a  piece,  usually  brownish, 
up  to  several  inches  in  length,  resulting  from  burrowing  of  larvae  in  the  growing 
tissue  of  the  tree. 
pith  knot.  See  knot. 
pith  shake.  See  shake. 
plain  sawed.  See  flat  grain. 
plank.  See  paragraph  803 ;  also  joists. 
pocket.  See  bark,  gum,  and  pitch  pocket. 
pocket  rot.  See  decay. 

post.  Lumber  of  square  or  approximately  square  cross  section,  graded  primarily  for  use 
as  posts  or  columns  carrying  longitudinal  load,  but  adapted  to  miscellaneous  uses 
in  which  strength  in  bending  is  not  especially  important.  Nominal  sizes:   5  by  5 


Wood    Bridges    and    Trestles 259 

inches  and  larger.  Standard  sizes:    SlS,  SlE,  S2S,  or  S4S,  in  less  than   6  by   6 
inches,  ^  inch  oJEf  each  way;   6  by  6  inches  and  larger,  y^  inch  off  each  way. 
Standard  lengths:  Multiples  of  2  feet. 
quarter  sawed.  See  edge  grain. 

radial.  Coincident  with  a  radius  from  the  axis  (pith)  of  the  tree  to  the  circumference. 
raised  grain.  Roughened  condition  of  the  surface  of  dressed  lumber  in  which  the  hard 

summerwood  is  raised  above  the  softer  springwood,  but  not  torn  loose  from  it. 
red  heart.  See  firm  red  heart. 
rift  grain.  See  edge  grain. 
ring.  See  annual  ring. 
rot,  hard.  See  incipient  decay. 
rot,  soft.  See  advanced  decay. 

rough  edge.  Piece  which  failed  to  surface  on  both  edges  because  of  scant  sawing. 
rough  lumber.  See  paragraph  804. 
rough  spot.  See  skip. 
round  shake.  See  shake. 
sap.  See  sapwood. 

sapwood.  Outer  layers  of  growth  in  a  tree,  exclusive  of  bark,  which  contain  living  ele- 
ments ;  usually  lighter  in  color  than  heartwood. 
bright  sapwood.  Unstained. 
saw  sized.  Sized  with  fine  saws  for  uses  where  exact  dimensions  but  not  dressed  surfaces 

are  necessary. 
sawing.  See  variation  in  sawing,  miscut  lumber,  bastard  sawn,  butted,  double  end 

trimmed,  plain  sawed  (flat  grain),  quarter  sawed  (edge  grain),  saw  sized. 
seam.  See  gum  and  pitch  seam. 
seasoning.  Evaporation  or  extraction  of  moisture  from  green  or  partially  dried  wood.  See 

paragraph  811,  also  air  dried,  kiln  dried,  moisture  content,  smoke  dried. 
select  lumber.  See  paragraph  844. 

Shake.  Separation  along  the  grain,  most  of  which  occurs  between  the  rings  of  annual 
growth. 
fine  shake.  A  barely  perceptible  opening. 

slight  shake.  More  than  a  perceptible  opening,  but  not  over  g'a  inch  wide. 
medium  shake.  Over  s's,  but  not  over  ^  inch  wide. 
open  shake.  Over  J^-inch  wide. 
cup  shake.  Does  not  completely  encircle  the  pith. 
round  shake.  Completely  encircles  the  pith. 
shell  shake.  When  both  ends  of  a  shake  which  has  been  cut  across  occur  on  the  face 

or  edge  of  a  piece. 
through  shake.  Extending  from  one  surface  through  the  piece  to  the  opposite  surface 

or  to  an  adjoining  surface. 
pith  shake,  (heart  check).  Extends  across  the  rings  of  annual  growth  in  one  or  more 
directions  from  the  pith  toward,  but  not  to  the  surface  of  a  piece.  Distinguished 
from   season   check  by   having   its  greatest   width   nearest  the  pith,  whereas   the 
greatest  width  of  a  season  check  is  ordinarily  at  the  surface  of  a  piece,  and  when 
a  piece  has  boxed  pith  the  greatest  width  of  a  season  check  is  farthest  from  the 
pith. 
shiplapped  lumber.  See  paragraph  804. 
side  cut.  A  pithless  piece. 
single  knot.  See  knot. 
skip.  Area  on  a  piece  that  failed  to  surface,  classified  as  follows: 


260  Wood    Bridges    and    Trestles 

slight  skip.  Area  not  over  six  times  the  width  of  the  piece  that  the  planer  knife 

failed  to  surface  smoothly. 
shallow  (small)  skip.  Area  not  over  six  times  the  width  of  the  piece  that  the  planer 

knife  failed  to  touch  by  not  over  3^2  inch. 
deep  (heavy)  skip.  Area  not  over  twelve  times  the  width  of  the  piece  that  the  planer 

knife  failed  to  touch  by  not  over  -^  inch. 
slash  grain.  See  flat  grain. 
smoke  dried.  Seasoned  in  the  open,  exposed  to  the  heat  and  smoke  of  a  fire  maintained 

beneath  and  within  stacks  of  lumber. 
soak.  See  water  soak. 
soft  rot.  See  advanced  decay. 
softwood.  One   of   the  group   of   trees   which   have   needle-like   or  scale-like   leaves.  The 

term  has  no  reference  to  the  softness  of  the  wood. 
solid  knot.  See  knot. 
sound.  Free  of  decay. 
spiral  grain.  Fibers  which  extend  spirally  about,  instead  of  vertically  along,  the  bole  of 

a  tree. 
split   (through  check).  Lengthwise  separation  of  the  wood  extending  from   one  surface 

through  the  piece  to  the  opposite  surface  or  to  an  adjoining  surface. 
short  split.  Length  does  not  exceed  either  the  width  of  a  piece  or  one-sixth  its  length. 
medium  split.  Length  exceeds  the  width  of  a  piece,  but  does  not  exceed  one-sixth  its 

length. 
long  split.  Length  exceeds  one-sixth  the  length  of  a  piece. 
spot.  See  GUM  and  rough  spot. 
springwood.  More  or  less  open  and  porous  tissue  marking  the  inner  part  of  each  annual 

ring,  formed  early  in  the  period  of  growth. 
square  edged.  Free  of  wane. 
square  (of  shingles).  See  paragraph  871. 
stain.  Discoloration,  occurring  on  or  in  lumber,  of  any  color  other  than  the  natural  color 

of  the  piece  on  which  it  appears;  classified  as  follows: 
light  stain.  Slight  difference  in  color  which  will  not  materially  impair  the  appearance 

of  the  piece  if  given  a  natural  finish. 
medium  stain.  Pronounced  difference  in  color  which,  although  it  does  not  obscure 

the  grain  of  the  wood,  is  customarily   objectionable  in   a  natural  but  not  in  a 

painted  finish. 
heavy  stain.  Difference  in  color  so  pronounced  as  practically  to  obscure  the  grain 

of  the  wood. 
straight  grain.  Wood  in  which  the  fiber  does  not  deviate  from  a  line  parallel  to  the  sides 

of  the  piece  sufficiently  to  constitute  sUght  cross  grain. 
streak.  See  gum  and  pitch  streak. 
stringer.  See  beams. 
strip.  See  paragraph  802. 
structural  lumber.  See  beams. 

summerwood.  Denser  fibrous  outer  portion  of  each  annual  ring,  usually  without  conspicu- 
ous pores,  formed  late  in  the  growing  period,  not  necessarily  in  summer. 
surface  check.  See  check. 
surfaced  lumber.  See  paragraph  804. 
through  check.  See  check. 
through  shake.  See  shake. 
tight  knot.  See  knot. 


Wood    Bridges    and    Trestles 261 

timbers.  See  paragraphs  802,  803.  See  beams  and  posts. 
torn  grain.  Part  of  the  wood  torn  out  in  dressing;  classified  as  follows: 
slight  torn  grain.  Not  over  s'2  inch  in  depth. 
medium  torn  grain.  Over  5^2,  but  not  over  iV  inch  deep. 
heavy  torn  grain.  Over  -in,  but  not  over  Ys  inch  deep. 
deep  torn  grain.  Over  ]/%  inch  deep. 
typical  decay.  See  decay. 
uneven  sawing.  See  variation  in  sawing. 
unsound.  Decayed. 
unstable  knot.  See  knot. 

variation  in  sawing.  Deviation  from  the  line  of  cut.  Slight  variation  is  not  over  -h  inch 
in  1-inch  lumber,  Y,  inch  in    2-inch,  tg  inch  in  3-  to  7-inch,  and  ^  inch  in  8-inch 
and  larger  lumber. 
vertical  grain.  See  edge  grain. 
wane.  Bark,  or  the  lack  of  wood  from  any  cause,  on  the  corner  of  a  piece. 

slight  wane.  Not  over  ^  inch  wide  on  the  surface  on  which  it  appears,  for  one-sixth 

the  length  and  one-fourth  the  thickness  of  the  piece. 
medium  wane.  Over  J4  inch,  but  not  over  J^  inch  wide  on  the  surface  on  which  it 

appears,  for  one-sixth  the  length  and  one-fourth  the  thickness  of  the  piece. 
large  wane.  Over  Yz  inch  wide  on  the  surface  on  which  it  appears,  or  over  one-sixth 
the  length  and  one-fourth  the  thickness  of  the  piece,  or  both. 


Page  7-81 

Delete  the  following  items: 

CBIS&E  Edge  and  center  bead  one  side;  i.e.,  surfaced  one  or  two  sides  and 

with  a  longitudinal  edge  and  center  bead  on  a  surfaced  face. 

CB2S&E  Edge  and  center  bead  two  sides;   i.e.,  all  four  sides  surfaced  and 

with  a  longitudinal  edge  and  center  bead  on  the  two  faces. 

CVlS&E  Edge  and  center    V  one  side;  i.e.,  surfaced  one  or  two  sides  and  with 

a  longitudinal  edge  and  center  V-shaped  groove  on  a  surfaced  face. 

CV2S&E  Edge  and  center  V  two  sides;  i.e.,  all  four  sides  surfaced  and  with  a 

longitudinal  edge  and  center  V-shaped  groove  on  the  two  faces. 

Insert  following  alphabetically: 

E&CBlS  Edge  and  center  bead  one  side;  surfaced  one  or  two  sides  and  with 

a  longitudinal  edge  and  center  bead  on  a  surfaced  face. 

E&CB2S  Edge  and  center  bead  two  sides;  all  four  sides  surfaced  and  with  a 

longitudinal  edge  and  center  bead  on  the  two  faces. 

E&CVIS  Edge  and  center  V  one  side;  surfaced  one  or  two  sides  and  with  a 

longitudinal  edge  and  center  V-shaped  groove  on  a  surfaced  face. 

E&CV2S  Edge  and  center  V  two  sides ;  all  four  sides  surfaced  and  with  a  longi- 

tudinal edge  and  center  V-shaped  groove  on  each  of  the  two 

faces. 

M.G  Mixed  grain.. 


262  Wood    Bridges    and    Trestles 

Pages  7-85  to  7-99,  inclusive — 

Delete  all  of  the  matter  now  appearing  under  the  heading: 

AMERICAN  LUMBER  STANDARDS  FOR  SOFTWOOD  LUMBER 

and  substitute  the  following: 

GENERAL 

[Lumber  is  the  product  of  the  saw  and  planing  mill  not  further  manufactured  than  by 
sawing,  resawing,  and  passing  lengthwise  through  a  standard  planing  machine,  cross- 
cutting  to  length  and  working.  Lumber  of  thickness  not  in  excess  of  one-quarter 
inch  to  be  used  for  veneering  is  classified  as  veneer.] 

Classifications 
Use  classification 

801.  For  the  purpose  of  simplification  of  sizes  and  grades  and  of  equahzing,  among 
species  used  for  similar  general  purposes,  the  grades  of  a  similar  name,  lumber  shall  be 
classified  by  principal  use  as  shown  below.  Different  grading  rules  may  apply  to  each 
class. 

Yard  lumber.- — Lumber  of  all  sizes  and  patterns  which  is  intended  for  general  build- 
ing purposes.  The  grading  of  yard  lumber  is  based  on  the  intended  use  of  the 
particular  grade  and  is  applied  to  each  piece  with  reference  to  its  size  and  length 
when  graded,  without  consideration  to  further  manufacture. 

Factory  and  shop  lumber. — Lumber  intended  to  be  cut  up  for  use  in  further  manu- 
facture. It  is  graded  on  the  basis  of  the  percentage  of  the  area  which  will  produce 
a  limited  number  of  cuttings  of  a  specified,  or  of  a  given  minimum,  size  and  quality. 

Structural  lumber.—Lurahtr  that  is  2  or  more  inches  thick  and  4  or  more  inches 
wide,  intended  for  use  where  working  stresses  are  required.  The  grading  of  struc- 
tural lumber  is  based  on  the  strength  of  the  piece  and  the  use  of  the  entire  piece. 

Size  classification 

802.  Yard  lumber  is  classified  by  size  as  shown  below: 

Strips. — ^Yard  lumber  less  than  2  inches  thick  and  less  than  8  inches  wide. 

Boards. — Yard  lumber  less  than  2  inches  thick,  8  or  more  inches  wide. 

Dimension.— A\\  yard  lumber  except  boards,  strips,  and  timbers;  that  is,  yard  lumber 
from  2  inches  to  but  not  including  5  inches  thick,  and  of  any  width. 

Timbers. — Lumber  5  or  more  inches  in  least  dimension. 

803.  Structural  lumber  is  classified  by  size  as  shown  below: 

Dimension  (joists  and  planks). — ^Lumber  from  2  inches  to  but  not  including  5  inches 
thick,  and  4  or  more  inches  wide. 

Timbers. — Lumber  5  or  more  inches  in  least  dimension. 
Beams  and  stringers. — Pieces  of  rectangular  cross  section  5  or  more  inches  thick, 
and  8  or  more  inches  wide. 

Posts  and  timbers. — Pieces  of  square  or  approximately  square  cross  section  S  by  5 
inches  and  larger. 


I 


Wood   Bridges   and    Trestles 263 

Manufacturing  Classification 

804.  Lumber  is  classified  according  to  the  extent  to  which  it  is  manufactured  as 
shown  below: 

Rough  lumber. — Lumber  undressed  as  it  comes  from  the  saw. 

Surfaced  lumber. — Lumber  that  is  dressed  by  running  it  through  a  planer.  It  may  be 
surfaced  on  one  side  (SIS),  two  sides  (S2S),  one  edge  (SlE),  two  edges  (S2E), 
or  on  a  combination  of  sides  and  edges:   (SlSlE),  (S2S1E),  (S1S2E),  or  (S4S). 

Worked  lumber. — Lumber  which  has  been  run  through  a  matching  machine,  sticker, 
or  moulder.  Worked  lumber  may  be: 
Matched  lumber. — Lumber  that  is  worked  to  provide  a  close  tongue-and-groove 

joint  at  the  edges  or,  in  the  case  of  end-matched  lumber,  at  the  ends  also. 
Shiplapped  lumber. — Lumber  that  is  worked  to  provide  a  close  rabbetted  or  lapped 

joint  at  the  edges. 
Patterned  lumber. — Worked  lumber  that  is  shaped  to  a  patterned  or  moulded  form. 

General  Grading  Rule  Provisions 
Size  and  Grade 

805.  To  the  extent  to  which  differences  in  the  characteristics  of  species,  in  quality 
of  logs,  in  conditions  of  manufacture,  and  in  the  uses  to  which  the  product  is  put,  will, 
in  practical  application,  permit,  the  basic  provisions  for  the  grading  of  lumber  shall  be 
uniform. 

806.  Lumber  not  conforming  to  standard  sizes  or  grades  and  that  intended  for 
special  uses  shall  be  covered  by  special  contract  and  inspection. 

807.  The  characteristics  and  limitations  in  any  grade  or  species  vary  as  the  area  of 
the  piece  to  be  graded  increases  or  diminishes  with  respect  to  the  basic  size  or  area 
specified,  but  their  size  shall  not  exceed  that  permitted  in  the  respective  grading  rules. 

808.  Whenever  any  characteristics  other  than  those  defined  in  regional  association 
grading  rules  are  encountered,  they  shall  be  regarded  as  equivalent  (equal)  to  permitted 
characteristics  or  prescribed  hmitations  in  proportion  to  their  effect  on  the  strength, 
appearance,  or  other  utility  value  of  the  piece  in  the  grade  under  consideration. 

809.  Characteristics  permitted  and  limitations  prescribed  in  rough  lumber  shall  be 
the  same  as  those  applying  to  dressed  lumber  of  like  kind  and  grade,  and,  in  addition, 
such  others  as  will  disappear  in  dressing  such  lumber  to  standard  sizes  shall  be  allowed. 

810.  Mixed  grades,  other  than  the  two  highest  recognized  grades  for  each  species, 
not  specifying  the  proportion  of  each  grade,  are  not  American  standard  grades. 

811.  Specifications  dealing  with  lumber  seasoning  and  moisture  content  shall  be 
developed  by  each  regional  manufacturers'  association  in  accordance  with  its  own  con- 
ditions and  the  requirements  of  the  users  of  its  products.  Such  specifications  adopted 
from  time  to  time  by  any  regional  association  shall  be  filed  with  the  Central  Committee 
on  Lumber  Standards  for  approval.  Each  association  publishing  grading  rules  shall  in- 
clude definitions  of  any  terms  used  therein  to  describe  condition  of  seasoning,  such  as  air 
dry,  kiln  dry,  shipping  dry. 

812.  In  addition  to  meeting  its  grade  specifications,  lumber  shipped  shall  conform 
to  such  grain,  heartwood,  sapwood,  moisture  content,  or  other  specifications  as  may  have 
been  agreed  to  in  the  contract  of  purchase  and  sale. 


264 Wood    Bridges    and    Trestles 

Description,  Measurement,  and  Tally 

813.  To  be  standard,  lumber  shall  be  described  by  the  thicknesses  and  widths  speci- 
fied in  paragraph  852,  and  see  also  definitions  of  Beams,  joists  and  posts.  Lumber  of 
other  sizes  shall  be  considered  special. 

814.  The  dressed  dimensions  specified  in  paragraph  852  shall  apply  to  lumber  in  the 
condition  of  seasoning  as  sold  and  shipped. 

815.  Board  measure  is  the  term  used  to  indicate  that  a  board  foot  is  the  unit  of 
measurement  of  lumber.  A  board  foot  is  the  quantity  of  lumber  contained  in,  or  derived 
from,  by  drying,  planing,  or  working,  or  by  any  combination  of  these  means,  a  piece  of 
rough  green  lumber  1  inch  thick,  12  inches  wide,  and  1  foot  long,  or  its  equivalent  in 
thicker,  wider,  narrower,  or  longer  lumber. 

816.  Except  moulding,  which  shall  be  tallied  in  linear  feet,  lumber  shall  be  talHed 
board  measure.  The  measurement  of  rough  dry  or  dressed  lumber  shall  be  based  on  the 
corresponding  nominal  dimensions  of  rough  green  lumber.  The  measurement  of  lumber 
of  thickness  less  than  1  inch  shall  be  based  on  the  surface  dimensions;  i.e.,  width  and 
length. 

817.  To  determine  the  board-foot  contents  of  lumber  thicker  than  1  inch,  the  surface 
measure  shall  be  multipHed  by  the  nominal  thickness  in  inches  and  fractions  of  an  inch. 

818.  Lumber  finished  to  special  size  shall  be  tallied  as  of  the  standard  rough  size 
necessarily  used  in  its  manufacture. 

819.  Lumber  of  stock  sizes  shall  be  talUed  by  the  number  of  pieces  of  each  size  and 
length  in  the  shipment. 

820.  Lumber  shipped  on  the  basis  of  board  measure  shall  be  taUied  by  the  number 
of  pieces  and  of  board  feet  in  each  piece. 

821.  In  shipments  of  lumber  measured  with  a  board  rule  on  actual  widths,  pieces 
measuring  to  the  even  half  foot  shall  be  alternately  counted  as  of  the  next  higher  and 
lower  foot  count;  fractions  below  the  half  foot  shall  be  dropped,  and  fractions  above 
the  half  foot  shall  be  counted  as  of  the  next  higher  foot. 

Shipping  Provisions 

822.  When  lumber  not  of  standard  size  is  shipped,  its  actual  thickness  and  width 
shall  be  shown  on  the  invoice. 

823.  In  shipments  of  rough  finish  and  boards,  pieces  one-half  inch  or  more  above 
the  count  thickness,  such  as  may  be  produced  by  uneven  sawing,  may,  at  the  option  of 
the  buyer,  be  rejected,  or  accepted  as  of  the  next  lower  grade. 

824.  The  average  length  of  a  shipment  of  lumber  shall  be  computed  by  dividing  the 
total  length  in  feet  by  the  total  number  of  pieces  in  a  shipment. 

825.  The  average  width  of  a  shipment  of  lumber  1  inch  or  less  in  thickness  shall 
be  computed  by  dividing  the  total  board  feet  by  the  total  length  in  feet  and  multiplying 
the  result  by  12.  The  total  board-foot  tally  of  lumber  thicker  than  1  inch  shall  be 
divided  first  by  the  thickness  as  expressed  in  inches  and  fractions  of  an  inch. 

826.  Each  length  of  bundled  lumber  except  end-matched  lumber  and  bevel  siding 
shall  be  bundled  separately. 

Tally  Cards 

827.  Cards  should  be  placed  in  cars  of  lumber  at  mill  of  origin,  showing  piece  tally 
by  grades  and  sizes:  Provided,  That  a  wholesale  dealer  or  other  buyer  or  shipper  may> 


Wood    Bridges    and    Trestles  265 

by  arrangement  with  mill  of  origin,  provide  for  the  use,  for  this  purpose,  of  a  whole- 
saler's or  buyer's  or  shipper's  car  card:  Provided,  That  in  such  case  said  wholesaler, 
buyer,  or  shipper  whose  name  appears  on  card  is  financially  responsible  for  the  correct- 
ness of  the  tally  as  shown  on  such  car  card;  And  provided,  That  this  shall  not  be  con- 
strued as  relieving  the  manufacturer  from  his  responsibility,  if  any,  to  such  wholesaler, 
buyer,  or  shipper. 

828.  The  grades  thus  required  to  be  entered  on  tally  card  shall  be  the  official  asso- 
ciation grades  as  defined  in  published  grading  rules:  Provided,  That  this  requirement  is 
not  construed  as  prohibiting  the  entry  on  tally  cards  of  special  grades,  but  that  such 
entry  is  not  recognized  under  American  Lumber  Standards. 

829.  The  Am^erican  Lumber  Standards  shall  not  apply  to  "special"  grades  (that  is, 
grades  not  recognized  in  published  grading  rules)  whether  entered  on  tally  cards  or  not. 

Inspection  and  Service 

830.  Lumber  manufactured,  graded,  measured,  and  described,  as  herein  provided, 
is  American  standard  lumber.  The  purchase,  sale,  or  shipment  of  lumber  as  American 
standard  is  construed  as  involving  agreement  to  submit  to  official  association  inspection 
any  complaint  involving  either  standard  sizes  or  standard  grades. 

831.  Lumber  must  be  accepted  on  grade  in  the  form  in  which  it  is  shipped.  Any 
subsequent  change  by  manufacture,  millwork,  or  dry  kilning  will  prohibit  an  inspection 
for  the  adjustment  of  claims,  except  with  the  consent  of  all  parties  interested. 

832.  Official  association  inspection  service  for  the  inspecting  of  lumber  sold  as  of 
standard  size  and  standard  grade  shall  be  available  to  nonmembers  of  associations  upon 
request  and  at  a  reasonable  charge. 

833.  In  case  of  complaint  on  account  of  the  grade  or  tally  of  any  shipment  of 
standard  size  or  standard  grade,  official  association  reinspection  shall  be  available. 

834.  Official  inspection  service  is  required  to  be  available  for  the  inspection  of  grades 
not  described  in  association  rules  (see  par.  806)  only  when  written,  detailed  specifica- 
tions accompany  the  request  for  such  inspection;  and  for  the  inspection  of  standard 
grades  in  nonstandard  sizes  only  on  the  basis  of  paragraph  807,  unless  otherwise  prescribed 
in  the  contract  of  purchase  and  sale. 

835.  When  buyers  demand,  and  will  pay  the  cost  thereof,  a  certificate  made  by  a 
certified  association  inspector  shall  be  furnished  with  each  shipment  so  arranged  for. 

836.  Upon  receipt  of  complaint  from  the  purchaser  the  seller  shall  immediately  re- 
quest the  association  under  whose  rules  shipment  has  been  made  to  provide  official  re- 
inspection  or  retally,  as  the  case  may  be,  according  to  its  inspection  rules  in  effect  at  the 
time  of  execution  of  contract,  and  the  purchaser  shall  lend  all  reasonable  assistance  to 
facilitate  the  reinspection  or  retally. 

837.  The  expense  of  such  reinspection  or  retally  may  be  divided  between  the  buyer 
and  seller,  or  may  be  borne  by  either,  according  to  agreement  between  them,  but  the 
person  calling  for  the  reinspection  shall  be  responsible  to  the  association  for  the  costs 
thereof. 

838.  In  case  of  complaint  involving  tally,  the  entire  item  shall  be  held  intact  for 
retally. 

839.  In  case  of  complaint  regarding  grade  or  size  but  not  involving  tally,  the  buyer 
is  required  to  accept  that  portion  of  a  shipment  of  lumber  of  standard  grade  or  standard 
size  which  is  up  to  grade  or  of  standard  size,  as  the  case  may  be,  holding  intact  that 
portion  thereof  the  grade  or  size  of  which  is  in  dispute  for  official  association  inspection, 


266 Wood    Bridges    and    Trestles 

but  the  action  on  the  part  of  the  buyer  in  accepting  and  using  such  portion  of  the  ship- 
ment shall  not  be  construed  as  his  acceptance  of  the  entire  shipment.  Further,  the  buyer 
shall  pay  in  accordance  with  the  terms  of  sale  for  that  portion  which  he  accepts,  but 
acceptance  by  the  buyer  of  a  part  of  a  shipment  does  not  prejudice  his  just  claims  on 
account  of  any  unused  lumber  that  is  alleged  by  him  to  be  below  standard  grade  or  not 
of  standard  size.  The  complainant  buyer  shall  hold  disputed  material  intact,  properly 
protected,  for  not  exceeding  30  days  after  date  of  the  request  for  official  inspection  or 
reinspection,  and  shall  file  complaint  with  seller  within  10  days  from  receipt  of  shipment. 

840.  Each  item  in  a  carload  or  cargo  shall  be  considered  as  of  the  grade  invoiced, 
if,  upon  official  association  reinspection  under  the  grading  and  inspection  rules  under 
which  the  lumber  has  been  graded  and  sold,  95  percent  thereof  or  more  is  found  to  be  of 
said  grade,  the  lumber  below  said  grade  to  be  accepted  by  the  buyer  as  of  its  actual 
grade.  Where  the  de-grades  are  in  excess  of  5  percent  of  such  item,  or  where  the  de- 
grades are  found  upon  official  reinspection  to  be  more  than  one  grade  lower  than  the 
grade  invoiced,  the  de-grades  shall  be  the  property  of  the  seller.  These  provisions  shall 
not  apply  in  the  case  of  specially  worked  lumber. 

841.  Each  association  shall  undertake  to  reinspect  lumber  for  its  members,  and  for 
nonmembers  upon  request. 

842.  All  grading  shall  be  done  by  properly  supervised  and  qualified  graders  or 
inspectors. 

843.  Sales  contracts  should  incorporate  in  substance  the  following  clause:  Shipment 
under  this  contract  shall  be  in  accordance  with  the  American  Lumber  Standards.  In  the 
case  of  shipments  made  or  received  under  such  contracts,  exemption  from  any  provi- 
sion of  the  American  Lumber  Standards  shall  be  by  special  agreement  and  the  burden  of 
proof  thereof  shall  be  upon  the  person  claiming  exemption. 

YARD  LUMBER 

[Lumber  manufactured  and  classified  into  those  sizes,  shapes,  and  qualities  required  for 
ordinary  construction  and  general-purpose  uses] 

Grade  Standards 
Basic  Classification 

844.  On  the  basis  of  quality,  yard  lumber  is  classified  as  follows:  (a)  Select  lumber, 
and  (b)  common  lumber.  These  are  again  divided  into  two  classes:  Select  lumber,  into 
(1)  that  suitable  for  natural  finishes,  and  (2)  that  suitable  for  paint  finishes;  common 
lumber,  into  (1)  that  which  can  be  used  without  waste,  and  (2)  that  which  permits 
some  waste.  Each  of  these  four  classes  is  further  divided  into  quality  classes  or  grades. 
The  grade  names  of  select  lumber  are  A,  B,  C,  and  D,  and  of  common  lumber.  No.  1, 
No.  2,  No.  3,  No.  4,  and  No.  5.  These  divisions,  classes,  and  grades  are  differentiated  as 
follows: 


W  o  o  d    B  r  i  dge  s    and    Trestles 


267 


Total  products  of  a  typi- 
cal log  arranged  in 
series  according  to 
quality  as  determined 
by  appearance  and 
use. 


SELECT 

Lumber  of  good  ap- 
pearance and  finish- 
ing qualities. 


COMMON 

Lumber  not  of  finish- 
ing quality,  but 
which  is  suitable  for 
general  utility  and 
construction  pur- 
poses. 


f  Grade  A. — Practically  clear. 
Suitable  for  natural  ^  Grade    B. — Of    high    quality — 
finishes.  [     generally  clear. 

high- 


Suitable    for    paint 
finishes. 


Suitable  for  use  with- 
out waste. 


Permitting  some 
waste. 


Grade    C. — Adapted    to 
quality  paint  finishes. 

Grade  D.  —  Intermediate  be- 
tween higher  finishing  grades 
and  common  grades,  and  par- 
taking somewhat  of  the  na- 
ture of  both. 

(No.  1 — Sound  and  tight  knotted. 

May  be  considered  watertight. 

No.  2 — Less  restricted  in  quality 

than  No.  1,  but  of  the  same 

general  character. 

No.  3 — Prevailing  grade  charac- 
teristics larger  than  in  No.  2. 

No.  4. — Low  quality. 

No.  5. — Lowest  recognized  grade 
but  must  be  usable. 


General  Provisions 

845.  The  rules  for  yard  lumber  shall  prescribe  the  number,  extent,  and  limitations 
of  the  characteristics  permitted  in  the  poorest  pieces  admissible  in  each  grade.  A  grade 
shall  be  representative,  however,  and  shall  not  comprise  only  low-line  pieces. 

846.  Except  in  dimension  and  timbers,  the  grade  of  yard  lumber,  rough  or  surfaced 
two  sides,  shall  be  determined  from  the  better  or  face  side  of  the  piece,  and  lumber 
which  is  surfaced  one  side  only  shall  be  graded  from  the  surfaced  side. 

847.  The  grading  of  lumber  cannot  be  considered  an  exact  science,  because  it  is 
based  on  a  visual  inspection  of  each  piece  and  on  the  judgment  of  the  grader.  Grading 
rules,  however,  shall  be  sufficiently  explicit  to  establish  5  percent  below  grade  as  a 
reasonable  variation  between  graders. 


Size  Standards 
Dressed  Sizes 

848.  The  terms  "standard  yard  board"  and  "standard  industrial  board",  and  "stand- 
ard yard  dimension"  and  "standard  industrial  dimension"  shall  be  the  designations  for 
1-inch  boards  and  2-inch  dimension,  respectively. 

849.  §i  inch,  SlS  or  S2S,  shall  be  the  minimum  thickness  for  the  standard  yard 
board;  |f  inch,  SIS  or  S2S,  for  the  standard  industrial  board. 

850.  15^  inches,  SlS  or  S2S,  shall  be  the  minimum  thickness  for  standard  yard  dimen- 
sion not  more  than  12  inches  wide;  1^  inches,  SlS  or  S2S,  for  standard  industrial 
dimension. 

851.  The  minimum  finished  widths  of  finish  SlE  or  S2E  shall  be  H  inch  off  on 
lumber  of  standard  width  of  3  inches;  the  finished  widths  of  finish  SlE  or  S2E  shall  be 
14  inch  off  on  lumber  of  standard  widths  of  4  to  7  inches,  inclusive,  and  ^  inch  off  on 
lumber  of  standard  widths  of  8  to  12  inches,  inclusive;  and  the  finished  widths  of  strips, 
boards  and  dimension  SlE  or  S2E  shall  be  }i  inch  off  on  lumber  of  standard  widths  less 
than  8  inches,  and  J^  inch  off  on  lumber  of  standard  widths  of  8  to  12  inches. 

852.  The  minimum  thicknesses  and  widths  of  finished  lumber,  SlS,  S2S,  SlE,  S2E, 
or  any  combination  thereof,  shall  be  as  follows: 


268 


Wood    Bridges   and    Trestles 


Strips,  Boards,  and  Dimension 

[The  thicknesses  apply  to  all  widths  and  the  widths  to  all  thicknesses] 


Thickness 

Width 

Product 

Board 
measure 

Minimum  dressed 
dimensions 

Board 
measure 

Minimum 
dressed 
dimen- 
sions— 

standard 

Yard 
standard 

Industrial 
standard 

Inches 

Inches 

% 
% 
If 

IJTe 
1^ 
2}^ 
2^ 

ff 

1^6 

Inches 

Inches 

3 

4 

5 

6 

Y 

8 

9 
10 
11 
12 

Inches 

2^ 

31^ 

4H 

5>^ 

1 

IM 

13^ 

3 

1 
IM 

26/32 

6^ 
7M 

8M 

9M 

1  6/8 

lOM 
llM 

Common:  strips  and  boards 

26/32 

3 

4 

5 

6 

Y 

8 

9 

10 

11 

12 

2 
4 
6 
8 
10 
12 

25^ 
3^ 

45^ 

5^ 

6^ 

Y>l 

8>^ 

93^ 

lOJ^ 

llj^ 

2 

2H 

3 

4 

IM 

2J^ 
2  5'^ 
35/8 

1  6/8 

15^ 

3^ 

5^^ 

7H 

9K 

llj^ 

Factory   Flooring,   Heavy   Roofing,   Decking, 
AND  Sheet  Piling 

[The  thicknesses  apply  to  all  widths  and  the  widths  to 
all  thicknesses] 


Thickness 

Width 

Board 
measure 

Minimum 
dressed 
dimen- 
sions— 

standard 

Board 
measure 

Minimum  dressed  di 
standard   face 

mensions, 
width 

D&M 

Ship- 
lapped 

Grooved 

for 
splines 

Inches 
2 

2H 
3 
4 

Inches 

\% 

2V8 

ZVs 

ays 

Inches 

4 

6 

8 
10 
12 

Inches 

SVs 

71-8 

9}8 

nys 

Inches 
3 
5 
7 
9 
11 

Inches 
3M 

73^ 

9)'i 

11>^ 

Note. — In  patterned  lumber  2  or  more  inches  thick,  board 
measure,  the  tongue  shall  be  3^  inch  wide  in  tongue-and-groove 
lumber  and  the  lap  ^  inch  wide  in  shiplapped  lumber,  with  the 
over-all  widths  i/s  inch  and  yi  inch  wider,  respectively,  than  the 
face  widths  shown  above. 


Wood    Bridges    and    Trestles 


269 


Siding,  Flooring,  Celling,  Partition,  Shiplap,  and  Dressed  and  Matched 
[The  thicknesses  apply  to  all  widths  and  the  widths  to  all  thicknesses  except  as  modified]' 


Thickness 

Width 

Product 

Board 
measure 

Minimum 

dressed 

dimensions — 

standard 

Board 
measure 

Minimum 

dressed 

dimensions — 

standard 

face  width 

Inches 

Inches 

'A  by  »^ 

10/16  by  'A 

Inches 
4 
5 
6 

8 
10 
12 

4 
5 
6 
8 

4 
5 
6 
8 

2 
3 
4 
5 
6 

Inches 
3H 
4H 

5'A 

3Ji 
4M 

5^6 

Wide  bevel  siding 

%  by  ?i^ 
%  by  ?i6 

% 

Rustic  and  drop  siding  (shiplapped) ..    . 

Rustic  and  drop  siding  (dressed  and  matched) 

% 
M 

7 

Flooring 

'A 
%. 
% 

I'A 

3M 

4)i 

5^A 

1 

Ceiling     ..    . 

3 
4 
5 
6 

3 

4 
5 
6 

4 

6 

8 

10 

12 

4 

6 

8 

10 

12 

2% 

4M 

5^6 

Partition 

2H 
3!4 

4M 

5^ 

Shiplap ,   ._.   

1 

H 

3^ 

5A 

7  A 

9A 

113^ 

Dressed  and  matched.   

1 

'A 

3ii 

9^ 

1134 

^  In  tongue-and-groove  flooring  and  in  tongue-and-groove  and  shiplapped  ceiling  A,  ■fs,  and  A  '"'^'i 
thick,  board  measure,  the  tongue  or  lap  shall  be  -^  inch  wide,  with  the  over-all  widths  -{^  inch  wider  than 
the  face  widths  shown  above.  In  all  other  patterned  lumber,  fj,  J4.  1.  1J4.  and  I^  inches  thick,  board 
measure,  the  tongue  shall  be  14  inch  wide  in  tongue-and-groove  lumber,  and  the  lap  H  inch  wide  in  ship- 
lapped lumber,  with  the  over-all  widths  li  inch  and  3/s  inch  wider,  respectively,  than  the  face  widths 
shown  above. 


270 


Wood    Bridges   and   Trestles 


Rough  Dry  Sizes 

853.  The  standard  rough  dry  thickness  of  the  standard  yard  board  shall  be  not  less 
than  II  inch,  allowing  that  20  percent  of  a  shipment  may  be  not  less  than  ff  inch;  and 
the  standard  rough  dry  thickness  of  the  standard  industrial  board  shall  be  not  less  than 
fl  inch,  allowing  that  10  percent  of  a  shipment  may  be  not  less  than  §§  inch. 

854.  The  standard  rough  dry  thickness  of  finish,  common  boards,  and  dimension  of 
standard  sizes  1J4  or  more  inches  thick,  board  measure,  shall  be  not  less  than  J^  inch 
thicker  than  the  corresponding  standard  finished  dry  thickness,  allowing  that  20  percent 
of  the  shipment  may  be  not  less  than  ^2  inch  thicker  than  the  corresponding  standard 
finished  dry  thickness. 

855.  The  standard  rough  width  of  finish  of  3-inch  width,  board  measure,  shall  be 
not  more  than  %  inch  less  than  the  nominal  width;  the  standard  rough-dry  widths  of 
finish,  of  widths  4  to  7  inches,  inclusive,  board  measure,  shall  be  not  more  than  ^  inch 
less  than  the  nominal  widths,  and  widths  8  to  12  inches,  inclusive,  board  measure,  shall 
be  not  more  than  %  inch  less  than  the  nominal  widths;  and  the  standard  rough-dry 
widths  of  common  strips,  boards,  and  dimension,  7  inches  and  narrower,  board  measure, 
shall  be  not  more  than  J4  inch  less  than  the  nominal  widths,  and  the  widths  8  to  12 
inches,  board  measure,  shall  be  not  more  than  f^  inch  less  than  the  nominal  widths. 

Description 

856.  The  description  of  the  dimensions  of  lumber  shall  be  as  follows: 


Thicknesslof.lumber  described  as- 


1  inch,  board  measure,  to  be  not  less  than 

IJ^  inches,  board  measure,  to  be  not  less  than 
IJ^  inches,  board  measure,  to  be  not  less  than 
\%  inches,  board  measure,  to  be  not  less  than 

2  inches,  board  measure,  to  be  not  less  than,  . 

2}^  inches,  board  measure,  to  be  not  less  than 

3  inches,  board  measure,  to  be  not  less  than.. 
3J^  inches,  board  measure,  to  be  not  less  than 

4  inches,  board  measure,  to  be  not  less  than.. 


Minimum 
thickness, 
SIS  or  S2S 


Inches 

tI 

^^ 
1 A 

lA 

15-8 

2-^ 


Note. — Widths  of  finish,  described  as  3,  4,  5,  6,  7,  8,  9,  10,  11  and  12 
inches,  board  measure,  to  be,  respectively,  not  less  than  2%,  SIE  or  S2E,  in 
the  condition  of  seasoning  as  sold  and  shipped,  and  3%,  4^,  SJ4,  6^^,  754. 
8J4'  954.  1054.  and  11J4  inches,  SIE  or  S2E;  widths  of  strips,  boards,  and 
dimension,  described  as  2,  3,  4,  5,  6,  7,  8,  9,  10,  11  and  12  inches,  board 
measure,  to  be,  respectively,  not  less  than  1§^,  Z^A,  3%,  4%,  5%,  65^, 
754,  81^,  91^,  lOyi,  and  11^^  inches,  SIE  or  S2E,  in  the  condition  of 
seasoning  as  sold  and  shipped. 

The  description  of  thickness  of  dressed  stock  less  than  1  inch  thick, 
board  measure,  SIS  or  S2S,  to  be  its  actual  thickness  in  the  condition  of 
seasoning  as  sold  and   shipped. 

It  is  to  be  understood  that  the  standard  dimensions  of  rough  lumber  are 
in  excess  of  the  dimensions  of  finished  lumber  of  the  corresponding  size, 
board  measure,  by  the  amount  necessary  to  permit  of  surfacing  either  1  or 
2  sides,  1  or  2  edges,  or  any  combination  of  sides  and  edges. 

Lengths 

857.  The  marketing  practice  covering  lengths  of  yard  lumber  shall  permit  the  buyer 
to  obtain  specified  lengths,  specified  assortments  of  lengths,  or  both. 

858.  Standard  lengths  of  yard  lumber  shall  be  in  multiples  of  1  or  2  feet  as  specified 
in  the  manufacturers'  association  grading  rules. 

859.  Unless  otherwise  stated  in  the  contract  of  purchase,  yard  lumber  shall  be  double 
end-trimmed  within  a  tolerance  not  exceeding  3  inches  in  excess  of  the  nominal  length. 


Wood    Bridges    and    Trestles 271 

FACTORY  AND  SHOP  LUMBER 

[Lumber  graded  with  reference  to  its  use  for  doors  and  sash,  or  on  the  basis  of  char- 
acteristics affecting  its  use  for  general  cut-up  purposes,  or  on  the  basis  of  size  of 
cuttings] 
(Standards  for  Factory  and  Shop  lumber  are  not  included  because  of  their  limited 

application  to  railroad  uses.) 

STRUCTURAL  LUMBER 

[Basic  provisions  for  selection  and  inspection  where  working  stresses  are  required] 
(Standards   for   Structural   Lumber   are  included   in   "Specifications   for   Structural 
Timbers"— pages  7-17  to  7-35.) 

SHINGLES' 

[Thin  lumber  tapered  lengthwise,  used  overlapped  on  roofs  and  side  walls  with  a 
definite  portion  of  the  length  exposed  to  the  weather] 

Grade  Standard 
Basic  Classification 

860.  The  basic  classification  for  shingles  is: 

I  No.    1. — Edge   grained,   clear   throughout, 
all  heartwood,  thickness  uniform,  butts 
and  one  face  smooth. 
No.  2.2 
No.  3.2 

[No.   1. — Edge   grained,   clear   throughout. 
Dimension  shingles;  i.  e.,  of  sped-  \     all  heartwood,  thickness  uniform,  butts 
fied  width.  (     and  one  face  smooth. 

INo.  2.2 

Size  Standards 

861.  The  standard  sizes  of  shingles  are  16  inches  long  by  5/2  thick,  18  inches  long 
by  5/2^  thick,  and  24  inches  long  by  4/2  thick.  (Shingles  are  measured  at  the  butt 
ends,  and  their  thickness  designated  as  the  number  required  to  constitute  a  specified 
unit.  Hence  5/2,  S/2J4,  and  4/2  mean,  respectively,  5  shingles  to  2  inches,  5  shingles  to 
2J4  inches,  and  4  shingles  to  2  inches.)  Standard  widths  for  dimension  shingles  16  and 
18  inches  long  are  5  and  6  inches,  and  for  24-inch  shingles,  6  inches. 

862.  Lengths  may  vary  not  more  than  1  inch  over  or  under  in  not  to  exceed  10  per- 
cent of  any  shipment,  but  shingles  cut  from  equalized  blocks  or  rebutted  stock  may  be 
J4  inch  short. 

863.  The  maximum  width  of  shingles  is  14  inches.  The  minimum  width  is  4  inches 
for  24-inch  shingles.  For  16-  and  18-inch  shingles,  the  minimum  width  is  3  inches,  but 
shingles  less  than  4  inches  wide  shall  not  exceed  10  percent  of  the  running  inches  in  any 
shipment. 

864.  The  width  of  shingles  shall  be  uniform;  that  is,  their  sides  shall  not  be  out  of 
parallel  more  than  J4  inch. 

865.  The  width  of  dimension  shingles  when  dry  may  be  not  more  than  }4  inch 
scant. 


'This  section  covers  No.  1  grade  shingles  of  the  following  species:  Western  red  cedar  (Thuja 
plicata),  red  cypress  (Taxodium  distichum) ,  and  redwood  (Sequoia  sempervirens). 

'  Basic  descriptions  for  these  grades  are  not  included,  because  the  various  shingle-producing  groups 
have  not  adopted  a  uniform  clarification  extending  beyond  No.  1  grade. 


272 


Wood   Bridges   and   Trestles 


866.  Bundles  of  shingles  may  measure  across  the  butts  when  dry  3  percent  less 
than  the  calculated  thickness  based  on  size  of  shingle  and  number  of  courses  in  the 
bundle.  Example:   14  courses  of  4/2  shingles  equals  7  inches  across  the  butts. 

General  Provisions 

867.  The  detailed  rules  for  grading  shingles  shall  prescribe  the  number,  extent,  and 
limitations  of  the  characteristics  permitted  in  the  poorest  piece  admissible  in  each  grade. 
A  grade  shall  be  representative,  however,  and  shall  not  comprise  only  low-line  pieces. 

868.  Cross  grain  which  slopes  from  one  face  to  the  other  within  a  longitudinal  dis- 
tance of  4  inches  in  any  portion  less  than  12  inches  from  the  butt  is  not  permitted. 

869.  Diagonal  grain  which  diverges  from  a  line  parallel  to  the  edges  of  a  shingle 
by  2  inches  or  more  in  12  inches  of  length  measured  from  the  butt  is  not  permitted. 

870.  Holes  and  knots  which  are  not  round  shall  be  measured  by  the  shortest 
dimension. 

Packing  and  Shipping  Provisions 

871.  When  shingles  are  packed  by  the  square,  which  is  the  quantity  required  to 
cover  100  square  feet  at  the  prescribed  exposure  to  the  weather,  they  shall  be  packed 
flat  in  straight  courses  in  regulation  frames  20  inches  wide  with  band  sticks  at  least  19J^ 
inches  long,  and  in  random-width  shingles  there  shall  be  an  average  of  not  less  than 
18^  running  inches  of  shingles  per  bundle  course. 

872.  Dimension  shingles  not  packed  by  the  square  may  be  designated  by  the  number 
of  pieces  per  bundle. 

873.  When  shingles  are  packed  by  the  square,  courses  per  bundle  and  bundles  per 
square  shall  be  as  follows: 


Shingle  size  (inches) 


Number 
of  cours- 
es per 
bundle  » 


Roof  square 


Number 

of 
bundle 


Exposure 

to 
weather 


Side-wall  square 


Number 

of 
bundles 


Exposure 

to 
weather 


Pieces 

per 
bundle 


Random-width 

24 

18 

16 

Dimension: 

24  by  6 

18  by  5 

18  by  6 

16  by  5 

16  by  6 


13/14 
18/18 
20/20 


14/14 
16/16 
17/18 
18/18 
19/20 


Inches 

7M 

5 


7H 

5 
5 


Inches 
10 

6M 


10 

7^ 

6M 


84 
bl36 
>>113 
i'152 
bl25 


»  13/14  means  13  courses  on  one  end,  14  courses  on  the  other,  a  total  of  27. 
•>  Including  8  cross  shingles. 

874.  The  class  and  grade  shall  be  shown  indelibly  on  each  bundle  of  shingles. 

875.  A  shipment  is  off  grade  when  more  than  4  percent  of  its  total  running  inches 
consist  of  defective  shingles. 


WoodBridgesandTrestles  273 


Report  on  Assignment  2 

Simplification  of  Grading  Rules  and  Classification  of  Timber 

for  Railway  Uses 

Collaborating  with  Other  Organizations  Interested 

H.  Austin  (chairman,  subcommittee),  M.  W.  Beach,  S.  Blumenthal,  D.  H.  Dowe,  W.  E. 
Hawley,  C.  J.  Hogue,  W.  O.  Nelson,  J.  A.  Newlin,  W.  H.  O'Brien,  L.  W.  Smith. 

Under  this  assignment  your  committee  has  participated  actively  in  the  revision  of 
the  National  Lumber  Standards,  having  reviewed  and  commented  on  the  revisions,  and 
maintained  close  contact  with  Mr.  John  Foley,  AREA  representative  (and  chairman)  of 
the  Central  Committee  on  Lumber  Standards. 

The  revised  standards  have  been  issued  as  Simphfied  Practice  Recommendations 
R-16-39,  approved  by  the  National  Bureau  of  Standards. 

To  effect  the  desired  conformity  with  the  revised  American  Lumber  Standards,  your 
committee  in  collaboration  with  Mr.  Foley  has  prepared  the  revisions  of  the  Manual 
presented  for  adoption  in  the  report  on  Assignment  1 — Revision  of  the  Manual. 


Report  on  Assignment  4 
Specifications  for  Design  of  Wood  Bridges  and  Trestles 

R.  P.  Hart  (chairman,  subcommittee),  S.  Blumenthal,  F.  H.  Cramer,  S.  F.  Grear,  G.  V. 
Guerin,  Jr.,  W.  O.  Nelson,  W.  A.  OUver,  L.  W.  Smith,  W.  C.  Schakel. 

Your  committee  submits  the  following  specification  for  consideration  and  construc- 
tive criticism  at  this  time.  After  further  study  and  suitable  revision  during  the  current 
year,  it  is  expected  the  specification  will  be  presented  in  1942  for  adoption  as  Manual 
material. 

SPECIFICATIONS  FOR   DESIGN  OF  WOOD   BRIDGES  AND 
TRESTLES   FOR  RAILWAY   LOADING 

FOREWORD 

The  following  specifications  contemplate  the  use  of  sound  wood  piles  and  stress 
grades  of  structural  timbers  conforming  to  AREA  specifications.  The  principles  of  design 
are  based  upon  and  conform  with  tests  made  at  the  U.  S.  Forest  Products  Laboratory. 
Unit  working  stresses  adopted  by  the  Engineer  for  the  design  of  any  structure  should 
therefore  conform  with  the  stress  grades  of  timbers  to  be  used  in  the  structure,  making 
due  allowance  for  "Continuously  Wet"  or  "Occasionally  Wet  but  Quickly  Dried"  condi- 
tions, as  recommended  in  the  Foreword  to  Specifications  for  Structural  Timbers. 

It  should  be  kept  in  mind  that  wood  piles  and  timbers  have  natural  characteristics 
not  common  to  other  structural  materials.  Securing  timbers  to  meet  design  requirements 
is  not  a  matter  of  bringing  together  several  natural  materials  according  to  a  formula,  but 
one  of  selecting  pieces  of  suitable  strength  from  nature's  supply,  all  according  to  grading 
rules  now  well  estabhshed  and  generally  accepted.  The  outstanding  characteristic  of  these 
wood  materials  is  their  abiUty  to  absorb  shock  resulting  from  sudden  application  of  loads. 


274 Wood    Bridges   and   Trestles 

Working  values  for  stress  grades  of  structural  timbers  may  be  used  without  allow- 
ance for  impact  up  to  impact  of  100  percent  of  loads  figured.  The  ability  of  timbers  to 
support  loads  is  very  dependent  upon  the  duration  of  the  stress.  Tests  have  demon- 
strated that  the  load  required  to  break  timbers  in  several  years  is  about  ts  of  that 
required  to  break  them  as  in  ordinary  laboratory  tests.  When  the  time  is  shortened  still 
further,  as  in  impact  loading,  the  load  required  to  break  a  timber  is  correspondingly  in- 
creased. Approximately,  this  increase  is  10  percent  when  the  time  is  reduced  1/10  of  the 
previous  time.  Working  stresses  for  5-minute  loading  may  be  increased  50  percent  over 
those  for  longtime  loading. 

Working  values  for  horizontal  shear  are  maximum  values.  The  maximum  unit  hori- 
zontal shear  at  any  point  in  the  length  of  a  beam  is  usually  calculated  as  being  3/2  of 
the  average  vertical  shearing  stress  at  that  point.  This  assumption  gives  a  very  simple 
formula  and  though  it  is  greatly  in  error  with  checked  beams  loaded  near  the  supports, 
its  continued  use  is  recommended  with  certain  assumptions  as  to  the  placement  of  live 
loads  and  the  neglecting  of  certain  loads  near  the  supports  for  the  purpose  of  correcting 
the  most  outstanding  errors  in  the  formula  without  complicating  the  caluculations.  How- 
ever, there  is  given  a  formula  for  use  in  conjunction  with  the  ordinary  shear  formula 
whenever  the  simple  assumptions  as  to  loads  and  their  placement  are  not  sufficiently 
accurate. 

GENERAL  FEATURES  OF  DESIGN 

1001.  All  members  shall  be  so  framed,  anchored,  tied  and  braced  together  as  to 
develop  the  strength  and  rigidity  necessary  for  the  purposes  for  which  they  are  used. 

1002.  Piles  shall  be  driven  to  the  required  bearing  capacity  in  accordance  with 
AREA  specifications  for  driving  wood  piles.  Posts  shall  be  provided  with  adequate 
foundation  to  support  the  loads  superimposed  upon  them. 

1003.  Bents  shall  consist  of  a  sufficient  number  of  piles  or  posts,  correctly  spaced, 
so  that  no  member  in  any  bent  will  be  overstressed  under  any  condition  of  loading.  For 
the  purpose  of  computing  stresses  in  the  bents  their  spacing  shall  be  considered  as  the 
distance  center  to  center  of  caps  thereon. 

1004.  Stringers  shall  be  selected  to  provide: 

(a)  Depth,  preferably,  not  less  than  ^2  of  distance  center  to  center  of  supports. 

(b)  Width,  not  less  than  Vs  of  the  depth. 

(c)  Maximum  deflection  under  design  Hve  load,  1/400  of  the  span. 

For  the  purpose  of  computing  stresses  in  stringers  the  span  length  shall  be  assumed 
as  the  clear  distance  face  to  face  of  bearings,  plus  6  inches.  Stringers  in  a  group  shall  be 
placed  to  effect,  as  nearly  as  practicable,  equal  distribution  of  superimposed  loads. 

1005.  Cross  ties  shall  be  of  adequate  size  to  distribute  the  track  load  equally  to  all 
stress-carrying  stringers.  Each  tie  shall  be  designed  to  carry  not  less  than  Vs  of  the 
maximum  axle  load.  They  shall  be  secured  against  bunching  and  the  maximum  space 
between  them,  on  open  deck  bridges,  shall  be  6  inches. 

DESIGN  LOADS 

1006.  The  following  loads  shall  be  considered: 

(a)  Dead  load 

(b)  Live  load 

(c)  Centrifugal  force 

(d)  Lateral  force  due  to  wind  load  and  nosing  of  locomotives 

(e)  Longitudinal  force 


Wood    Bridges   and    Trestles      275 

1007.  The  dead  load  shall  consist  of  the  estimated  weight  of  the  structural  member, 
plus  that  of  the  track,  ballast  and  other  portions  of  the  structure  supported  thereby.  The 
weight  of  unit  quantities  of  materials  shall  be  assumed  to  be  as  follows: 

Track  rails,  inside  guard  rails,  and  fastenings 200  pounds  per  linear  foot 

of  track 

Ballast,  including  track  ties 120  pounds  per  cubic  foot 

Timber    S  pounds  per  foot  board 

measure 

Protective  coverings    Actual  weight 

1008.  The  live  load  per  track  shall  consist  of  that  Cooper's  loading  which  will  pro- 
duce a  loading  effect  equivalent  to  the  maximum  engine  or  train  load  expected  to  be 
moved  over  the  completed  structure. 

On  bridges  with  ballasted  deck  the  live  load  shall  be  assumed  as  distributed  later- 
ally over  a  width  equal  to  the  length  of  track  ties,  plus  twice  the  depth  of  ballast  below 
the  base  of  tie,  unless  deck  planks  are  designed  to  effect  greater  distribution  of  the  load. 

For  members  receiving  load  from  more  than  one  track  all  tracks  contributing  load 
shall  be  assumed  fully  loaded. 

1009.  The  centrifugal  force  considered  in  the  design  of  bridges  supporting  curved 
track  shall  be  a  percentage  of  the  specified  live  load,  assumed  to  act  6  feet  above  the 
top  of  traffic  rails.  The  percentage  used  may  be  taken  as  0.001175^  D,  where  5  is  the 
speed  in  miles  per  hour  and  D  is  the  degree  of  curve,  or  it  may  be  taken  from  the 
following  suggested  table: 

Degree  of  Curve  Speed  in  MJ*JI.  Percentage 

0''-20'  80  2.S 

20' -40'  80  5 

40'-  1°  80  7.5 

Over  1  °         65,  and  less  10 

The  effect  of  centrifugal  force  may  be  neglected  in  the  design  of  stringers  where  the 
track  is  superelevated  to  compensate  for  maximum  speed  of  moving  load  or  where 
stringers  in  ballasted  deck  bridges  are  placed  symmetrically  about  the  intersection  of 
resultant  load  at  the  plane  of  top  of  stringers. 

1010.  The  lateral  force  due  to  wind  shall  be  assumed  as  30  pounds  per  square  foot 
of  vertical  projection  of  structure,  plus  300  pounds  per  linear  foot  of  train,  applied 
8  feet  above  top  of  traffic  rails.  The  wind  force  shall  be  assumed  to  act  horizontally, 
perpendicular  to  the  center  line  of  track. 

1011.  The  lateral  force  due  to  the  nosing  of  locomotives  shall  be  considered  as  a 
single  moving  force  of  20,000  pounds  applied  at  the  top  of  the  rail,  in  either  lateral 
direction,  at  any  point  of  the  span.  The  resulting  vertical  forces  shall  be  disregarded. 

1012.  For  stresses  produced  by  wind  or  other  lateral  forces,  or  by  a  combination 
of  these  forces  with  dead  and  live  loads,  the  allowable  working  stresses  other  than 
modulus  of  elasticity  may  be  increased  50  percent,  provided  the  resulting  sections  are 
not  less  than  those  required  for  dead  and  live  loads  alone. 

1013.  The  longitudinal  force  resulting  from  the  starting  and  stopping  of  trains  shall 
be  considered  as: 

(a)  For  open  deck  bridges,  the  larger  of 

(1)  Force  due  to  braking,  equal  to  15  percent  of  the  live  load. 

(2)  Force  due  to  traction,   equal    to    25    percent   of   the   weight    on    driving 
wheels  of  engine. 


276 Wood    Bridges    and    Trestles 

(b)  For  ballasted  deck  bridges,  10  percent  of  the  live  load  on  the  loaded  portion  of 
structure. 

In  any  case  the  longitudinal  force  shall  be  assumed  as  acting  6  feet  above  the  top 
of  traffic  rails. 

COMPUTATION  OF  STRESSES 

1014.  Except  as  modified  herein,  or  at  the  Engineer's  discretion,  all  stress  computa- 
tions shall  be  based  upon  the  actual  size  of  timbers.  Where  members  are  dapped  or 
otherwise  framed  in  a  manner  such  as  to  materially  reduce  the  effective  size  the 
minimum  cross  section  of  the  piece  shall  be  considered. 

1015.  The  following  procedure  shall  be  used  for  calculating  the  horizontal  shear  on 
the  neutral  plane  in  checked  beams: 

(a)  Except  as  otherwise  provided  herein,  use  the  following  shear  formula: 

_    3R 

~    2bh 

in  which  5  =  maximum  unit  shear  per  square  inch 
R  =  Reaction  in  pounds 
b  =  Breadth  of  beam  in  inches 
h  =  Height  of  beam  in  inches 

(b)  Results  obtained  must  not  exceed  the  allowable  unit  shear  stress. 

(c)  In  calculating  the  reaction  for  use  in  the  formula: 

(1)  Take  into  account  any  rehef  to  the  beam  under  consideration  resulting 
from  loading  being  distributed  to  adjacent  parallel  beams  by  flooring  or 
other  members  of  the  construction. 

(2)  Neglect  all  loads  within  the  height  of  the  beam  from  both  supports. 

(3)  If  there  are  any  moving  loads,  place  the  largest  one  at  3  times  the  height 
of  the  beam  from  the  support. 

(4)  Treat  all  other  loads  in  the  usual  manner 

(d)  If  a  timber  does  not  qualify  under  the  above  recommendations,  which  under 
certain  conditions  may  be  over-conservative,  the  reactions  for  the  concentrated 
loads  should  be  determined  by  the  following  equation: 


lOPiL 


-(ly 


[-(f)] 


in  which  r  =^  Reaction  to  be  used  as  due  to  a  Load  P 
L  =  Span  in  inches 

a  =  Distance  in  inches  from  reaction  to  Load  P 
h  =  Height  of  beam  in  inches 
(e)  Allowable  shear  stresses  for  joint  details  shall  be  taken  as  50  percent  greater 
than  the  values  for  horizontal  shear  given  in  the  tables  of  working  stresses. 

1016.  Timber  acquires  a  permanent  set  under  long  continued  loading.  This  set  with  a 
fully  loaded  beam  is  about  equal  to  the  deflection,  using  the  modulus  of  elasticity  as 
given  in  the  tables.  In  calculating  ultimate  deflection  under  long-continued  loading,  this 
factor  should  be  recognized. 

1017.  The  working  stresses  for  compression  perpendicular  to  grain  apply  to  bearings 
6  inches  or  more  in  length  located  anywhere  in  the  length  of  a  timber  and  to  bearings 
of  any  length  at  the  ends  of  beams  or  other  members.  For  bearings  shorter  than  6  inches 
located  3  inches  or  more  from  the  end  of  a  timber  the  stresses  may  be  increased  in 
accordance  with  the  following  factors: 

Length  of  bearing   (inches)    J^  1      1%  2  3  4     6  or  more 

Factor    1.85     1.60     1.45     1.30     1.15     1.10     1.00 


Wood    Bridges    and    Trestles 277 

For  stress  under  a  washer  the  same  factor  may  be  taken  as  for  a  bearing  whose 
length  equals  the  diameter  of  the  washer. 

1018.  The  working  stresses  for  compression  parallel  to  grain  are  for  use  on  posts, 
struts,  etc.,  with  an  unsupported  length  not  greater  than  10  times  their  least  dimension. 
They  are  also  for  use  in  end  bearing  on  compression  members,  as  a  short  column  or 
strut  is  more  likely  to  fail  at  the  end  than  at  any  other  point  in  its  length,  and  the 
variations  in  moisture  content  are  greater  at  that  point. 

For  columns  of  intermediate  length,  the  Forest  Products  Laboratory  finds  that  a 
fourth-power  parabola,  tangent  to  the  Euler  curve,  is  a  conservative  representation  of 
the  law  controlling  the  strength.  That  is,  from  the  short  block  to  the  long  column  in 
which  the  strength  is  dependent  on  stiffness,  there  is  a  falling  off  in  ultimate  strength 
which  follows  a  smooth  curve,  very  flat  at  first  but  curving  sharply  to  become  tangent 
to  the  Euler  curve  at  %  of  the  ultimate  crushing  strength. 

For  columns  from 

I-  =  C  into  Z  =.  A  C ; 
A  A3 


A       ^l  3\Kd)j 


Where   P  =  Total  load  in  pounds 
A  =  Area  in  square  inches 
P/A  =  Unit  compressive  stress 

C  =  Safe  stress  in  compression  parallel  to  grain  for  short  columns 

L  =  Unsupported  length  in  inches 

d  =  Least  dimension  in  inches 

E  =z  Modulus  of  elasticity 

K  =  The  L/d  at  the  point  of  tangency  of  the  parabolic  and  Euler  curves 

at  which  —  =  —  C 


The  value  of  K  for  any  species  and  grade  is— i/— — 


For  allowable  unit  stress  L/d,  10  to  K,  see  Table  A. 

The  influence  of  defects  on  the  compressive  strength  of  columns  of  constant  cross 
section  decreases  as  the  length  increases.  When  L/d  equals  the  value  of  K  for  the  species 
and  grade,  the  strength-reducing  factors  allowable  in  the  grade  have  little  influence  on 
the  strength  as  a  column.  Beyond  this  length  the  investigation  of  the  strength  of  col- 
umns by  the  laboratory  indicated  that  the  Euler  formula  is  quite  accurate  for  long 
wood  columns  with  pin-end  connections  and  that  the  maximum  load  is  dependent  upon 
stiffness.  In  such  columns,  a  factor  of  safety  of  3  should  be  applied  to  values  of  the 
modulus  of  elasticity  in  order  to  obtain  safe  loading. 

The  laboratory  does  not,  with  the  present  data  and  under  ordinary  conditions,  find 
justification  for  increasing  the  stresses  on  square-end  columns  over  those  for  carefully 
centered  pin-end  columns.  Tests  to  determine  the  influence  of  end  conditions  are  still 
being  made  and  it  is  probable  that  under  special  conditions  higher  stresses  can  be  used. 

For  long  columns,  including  a  factor  of  safety  of  3: 
_P_jT^      E         0.274£ 
A  ^  36 


m  {tJ 


L 

For  unit  stress  — r  K  to  50,  see  Table  A. 
d 


278 


Wood    Bridges   an  d    Trestles 


O 


5 

iHrH 

MM-*lO 

OjTfCD  t- 
T-(.Hr-l>-( 

MM-*lffl 

coTfcot- 

MM-*in 

co-a"CD  t- 

OMlO 
rHCO  t- 

o 

rH 

55 

COCO 

MtorotD 

tOt-Ort 
rHrtMM 

NCOCOtO 
CD  t-O^ 
i-HrtMN 

eqcoeoto 

tOt-OrH 
1-lrHMM 

UJMtD 

COtDrH 
rHr-IM 

CO 

§ 

tO05t-T)l 
OMU5  t- 
MMMM 

;ocot--* 
OMin  t- 

MMMM 

to  cot--* 

OMiO  t- 
MMMM 

rHCOTft 

t-o  t- 

r-lMM 

t- 

rHOO 

OOiHtOM 
CD05MU3 
MMCOm 

00  tH  CD  00 

CO  OS  com 

MMCOCO 

00  rH  CO  00 

«D  OS  CO  in 

MMCOCO 

■<f  OOOO 
M5D10 
MMCO 

M 
M 

.2 
too 

Q 

cot- 
OS  00 

U5CO  t- t- 

CO  Clio  00 

cc  CO  ^  ■*# 

in  cot- 1- 

CO  OS  "5  00 

CO  CO  "^  ^ 

in  cot- 1- 

coosmoo 
CO  CO  "^  ^ 

TCint- 
o«ooo 
coco-* 

■* 
o 
CO 

■2 

U5t- 

coooo^ 

Mt>iOO 

loioco  t- 

cooooth 

Mt-iOO 

loincDC- 

coooo  t- 

Mt-U5  0S 

miocoto 

00  too 

COMOO 
Tl«lOCD 

00 

CO 

■2 

am 
ooo 

cot-os«o 

MMiOOO 

00  00  OS  OS 

OrJlTjilO 
iHlO-^CO 
00  00  OS  OS 

ocoosto 
oor-imc- 
t-  oooo  00 

TliOO 

t-->*rH 
!Dt-00 

OS 
CO 
50 

a; 

aoo 

TON 

OrH 

COOSMO 
U5  00-«)<CO 
OSOSOO 

ooo  00 -H 

THCOt-OS 
OS  OS  OS  OS 

<Dt-00  00 
lO  t-OrH 
00  00  OS  OS 

OlOrH 
lOOSTjl 

c-t-00 

■* 
OS 

CO 

to 

NO 

CCOJ 

T-(rH 

U5  00MM 

TfCCOrH 

oot-i^ 

^OS-^M 
OOOSMCO 

ososoo 

OCOMOO 

r-lMTl<-<J( 
OS  OS  OS  OS 

CD-'J'CO 
OCOtD 

00  00  00 

•* 
CO 
t- 

^ 

eou5 
ow 

(MM 

iHi-( 

ONMOO 
i-HM-*-^ 

T-<^U30 

co-*":nD 
oooo 

t->OCDO 

■^lOCO  t- 

0^  OS  OS  OS 

lOrHOO 
T(<COt- 

00  00  00 

M 

CO 

t- 

IN 

t-lO 
TtCD 
MM 

iHOOOSN 
10U3«!  t- 

CO  00  (D  00 

coco  c- 1- 
oooo 

M<DMt1" 
t-t-00  00 

OS  OS  OS  OS 

oosoo 

t- t-00 

00  00  00 

CTS 

t- 

t- 

<3 

OO 

oo 
coco 

OOOO 

oooo 

MMMN 

oooo 
oooo 

oooo 
oooo 
oooo 

ooo 
ooo 
OS  OS  OS 

o 
o 
00 

i<: 

eoio 

COr-lt-T)l 

Mr-It- ■<(< 

MrHOOtO 

Tt  Tj<0 

t- 

MM 

MMMM 

r-iMeo-<Ji 
MMMM 

MC0-*U5 
MMMM 

rHCO  t- 

NNM 

M 
M 

"5  ~ 

OO 

oo 
oo 

oooo 
oooo 
oooo 

oooo 
oooo 
oooo 

oooo 
oooo 
oooo 

ooo 
ooo 
ooo 

o 
o 
o 

oo 
oo 
eoto 

oooo 
oooo 

MC0U5CD 

oooo 
oooo 

MCOiOCD 

oooo 
oooo 

MC01O5O 

ooo 
ooo 

OM«D 

o 
o 
o 

"^ 

2 

c 

3 

o 
o 

CO 
rH 

O 
O 
M 

d 
o 

d 

o 
o 

o 
o 

OS 

o 
o 
00 

Wood    Bridges    and    Trestles 


279 


Columns  should  be  limited  in  slenderness  to  Lid  =  SO. 

1019.  For  bearing  stresses  on  surfaces  at  an  angle  to  the  direction  of  the  grain,  the 
following  (Hankinson)  formula  has  been  found  to  be  the  best  for  general  use  in  timber 
framing: 

N  = ^ 

P  sirv^Q  +  Q  cofQ 

Note:  See  chart  "B"  on  next  page  for  graphical  solution. 

Where  N  =  Unit  compressive  stress  in  a  direction  at  inclination  with  the  direction  of 
the  grain. 
P  ^  Unit  stress  in  compression  parallel  to  the  grain. 
Q  =  Unit  stress  in  compression  perpendicular  to  the  grain. 

When  the  stress  acts  parallel  to  the  grain,  0  is  zero. 

When  the  stress  acts  perpendicular  to  the  grain,  0  is  90  degrees. 

For  sin'O  and  cofO,  use  the  following  table: 


Sin'Q 

e 

Cos'e 

Sin'B 

e 

CofO 

0.00000 

0 

1.00000 

0.00760 

5 

0.99240 

0.58682 

50 

0.41318 

0.03015 

10 

0.96985 

0.67101 

55 

0.32899 

0.06698 

15 

0.93302 

0.75000 

60 

0.25000 

0.11698 

20 

0.88302 

0.82140 

65 

0.17860 

0.17860 

25 

0.82140 

0.88302 

70 

0.11698 

0.25000 

30 

0.75000 

0.93302 

75 

0.06698 

0.32899 

35 

0.67101 

0.96985 

80 

0.03015 

0.41318 

40 

0.58682 

0.99240 

85 

0.00760 

0.50000 

45 

0.50000 

1.00000 

90 

0.00000 

DETAILS  OF  DESIGN  AND  APPLICATION  OF  GRADES 

1020.  Post  and  timber  grades  may  be  applied  to  material  smaller  than  sizes  tabu- 
lated in  grading  rules  by  Hmiting  the  size  of  knots  to  the  proportion  of  width  of  face 
permitted  on  sizes  given. 

1021.  For  direct  tension  use  the  same  unit  stresses  as  for  extreme  fiber  stress  in 
bending.  Straight  grained  wood  has  greater  resistance  to  tension  than  to  any  other  kind 
of  stress.  It  has  been  difficult  to  design  joints  that  will  develop  the  full  tensile  strength, 
but  the  availability  of  mechanical  or  ring-connectors  now  largely  eUminates  this  difficulty. 

1022.  Grades  of  joists  or  beams  may  be  used  for  members  in  longitudinal  tension, 
such  as  bottom  chords  or  tension  members  of  trusses,  but  grade  limitations  which  apply 
to  the  center  portions  of  joists  and  beams  should  be  applied  throughout  the  entire  length 
of  pieces  subjected  to  longitudinal  tension. 

1023.  The  provisions  of  the  joist  and  plank  grades  are  such  that  material  graded  on 
them  may  be  used  on  edge,  as  joists  or  rafters,  or  flat,  as  scaffold  plank  or  factory 
flooring,  and  working  stresses  for  these  grades  may  be  applied  to  such  material  used  with 
wide  faces  either  vertical  or  horizontal.  Joist  and  plank  grades  apply  to  material  not 
thicker  than  4  inches.  Material  thicker  than  4  inches,  for  use  in  bending,  should  be 
graded  on  beam  and  stringer  grades.  In  such  material,  with  loads  applied  to  the  wide 
face,  the  knot  limitations  for  this  face  are  those  for  the  narrow  face  as  given  in  the  rules. 

1024.  Material  to  be  used  for  such  purposes  as  caps,  bridge  ties,  etc.,  where  strength 
in  bending  is  a  factor,  should  be  specified  in  beam  and  stringer  grades,  although  they  are 
of  a  shape  more  commonly  considered  as  of  post  and  timber  grades,  as  the  method  of 
measuring  knots  in  post  and  timber  grades  makes  it  impracticable  to  assign  bending 
stresses  to  them.  Caps  and  bridge  ties  are  often  square  or  have  horizontal  faces  wider 


280 


Wood    Bridges   and   Trestles 


Wood    Bridges    and    Trestles 281 

than  the  vertical  faces,  in  contrast  to  beams  and  stringers,  in  which  the  narrow  faces  are 
horizontal  faces  and  the  wide  faces  are  vertical,  and  care  should  be  exercised  that  knot 
limitations  are  applied  to  the  proper  faces. 

1025.  In  railway  stringers  of  two-span  lengths,  it  should  be  specified  that  grade 
factors  throughout  the  center  two-thirds  be  limited  as  in  the  middle  third  or  middle 
half  of  a  single  span  stringer,  for  the  maximum  moment  will  be  over  the  center  support, 
and  although  the  full  positive  moment  will  not  be  developed  in  either  span  as  long  as 
there  is  resistance  to  negative  moment  over  the  center  support,  there  may  be  circum- 
stances in  which  full  positive  moment  of  resistance  at  the  centers  of  the  two  spans  will 
be  desirable. 

1026.  In  material  used  over  three  or  more  spans,  or  subject  to  varying  bending 
moments,  grade  limitations  should  be  apphed  throughout  the  entire  length  as  in  the 
middle  third  or  middle  half  of  joist  and  plank  and  beams  and  stringers. 

1027.  The  strength  of  timbers  and  posts  in  round  form  is  greater  than  would  be 
expected  from  the  ordinary  engineering  formulas.  The  strength,  stiffness,  and  horizontal 
shearing  value  in  bending  of  round  timbers  of  any  species  may  be  assumed  to  be 
identical  with  that  of  square  timbers  of  the  same  grade  and  cross  sectional  area.  Tapered 
timbers  should  be  assumed  as  of  uniform  diameter,  the  point  of  measurement  being  % 
the  span  from  the  small  end,  but  the  diameter  should  not  be  assumed  to  be  more  than 
lJ/2  times  the  small  end  diameter. 

1028.  The  strength  of  round  columns  may  be  considered  the  same  as  that  of  square 
columns  of  the  same  cross-sectional  area.  In  long  tapered  columns  the  strength  may  be 
assumed  as  identical  with  that  of  a  square  column  of  the  same  length,  and  of  cross- 
sectional  area  equal  to  that  of  the  round  timber  measured  at  a  point  one-third  its  length 
from  the  small  end.  The  stress  at  the  small  end  must  not  exceed  the  allowable  stress  for 
short  columns. 

1029.  In  determining  working  stresses,  the  Forest  Products  Laboratory  has  consid- 
ered both  elastic  limit  and  breaking  strength.  Elastic  limit,  however,  is  more  variable  and 
less  definite  than  ultimate  strength,  and  the  latter  is  taken  as  the  more  dependable 
basis  for  the  determination  of  safe  working  stresses. 

1030.  The  factor  of  safety  at  a  given  working  stress  varies  materially  with  the  dura- 
tion of  the  stress.  At  the  recommended  working  stresses,  the  average  timber  in  buildings 
has  a  factor  of  safety  of  6*  in  impact  loading,  4  under  five  minute  loads  and  2^  under 
long-time  loading,  with  a  minimum  factor  of  safety  of  2  on  75  percent  of  the  pieces 
under  long-time  loading,  while  about  one  piece  in  100,  of  very  light  weight  and  with 
maximum  defects  for  the  grade,  would  be  expected  to  break  at  IJ^  times  the  recom- 
mended stress  under  loading  of  approximately  ten  years'  duration.  The  factor  of  safety 
on  new  timbers  in  bridge  work  is  about  j  greater  than  the  arbove  values. 


*  If  impact  stresses  are  neglected  when  these  amount  to  less  than  100  percent  of  the  live  load  pro- 
ducing them,  the  factor  of  safety,  including  such  loads,  will  be  reduced  from  6  to  a  minimum  of  3. 

General  Note:  Detailed  studies  on  the  strength  of  timbers  in  round  form  are  available  in  Reports 
180  and  181  of  the  National  Advisory  Committee  for  Aeronautics  on  "The  Influence  of  the  Form  of  a 
Wooden  Beam  on  Its  Stiffness  and  Strength." 


282  Wood    Bridges   and   Trestles 


Report  on  Assignment  6 

Recommended  Relationships  Between  the  Energy  of  Hammer 
and  the  Weight  or  Mass  of  Pile  for  Proper  Pile  Driving 

To  Include  Concrete  Piles,  Collaborating  with  Committee  8 — Masonry 

H.  C.  Heinlen   (chairman,  subcommittee),  G.  S.  Crites,  C.  S.  Johnson,  W.  D.  Keeney, 
J.  E.  Myer,  W.  A.  Oliver,  W.  L.  Peoples. 

Your  committee  offers  as  information  the  following  redraft  of  the  conclusions  pre- 
sented in  its  report  for  1940.  The  revision  applies  to  that  portion  of  the  report  under 
the  heading  of  "Steam  Hammers",  where  some  limitations  are  recommended  to  serve  as  a 
guide  in  the  selection  of  pile  driving  equipment. 

General 

In  determining  the  weight  or  size  and  capacity  of  the  hammer  to  be  used  for  any 
service,  due  consideration  must  be  given  to  the  weight  and  spacing  of  the  piles,  the 
character  and  condition  of  the  soil  to  be  penetrated,  conditions  of  driving,  and  previous 
experience  at  the  site  or  under  similar  conditions.  The  blow  should  be  struck  by  a  ram 
having  sufficient  energy  to  overcome  the  inertia  of  the  pile  and  the  frictional  and  elastic 
resistance  encountered,  and  having  sufficient  weight  to  reduce  to  a  minimum  the  portion 
of  this  energy  which  is  unavoidably  dissipated  in  destructive  work  during  impact.  As  a 
general  rule,  piles  should  be  driven  with  the  heaviest  hammer  that,  in  the  judgment  of 
the  Engineer,  can  be  used  to  secure  maximum  penetration  without  appreciable  damage 
to  the  pile. 

Steam  Hammers 

For  driving  concrete  piles,  of  sizes  up  to  5  cubic  yards  in  volume,  the  hammer  shall 
have  sufficient  weight  and  power  to  develop  an  energy  per  blow,  at  each  full  stroke  of 
the  piston,  of  not  less  than  3,500  foot-pounds  per  cubic  yard  of  concrete  contained  in 
the  pile. 

The  weight  of  the  ram  should  be  not  less  than  one  fourth  the  weight  of  the  pile  to 
be  driven. 

The  total  energy  developed  by  the  hammer  should  be  not  less  than  12,000  foot- 
pounds per  blow. 

The  energy  should  be  developed  at  the  normal  rate  of  speed  of  the  hammer  and  the 
velocity  shall  not  be  increased  beyond  the  equivalent  of  a  five-foot  free  fall. 

For  concrete  piles  having  a  volume  of  more  than  5  cubic  yards,  or  where  unusual 
conditions  indicate  that  equipment  of  greater  capacity  may  be  required,  the  choice  of 
equipment  should  be  governed  by  previous  experience  at  the  site  or  under  similar 
conditions  elsewhere. 

For  driving  wood  piles,  the  weight  of  the  striking  part  of  the  hammer  should  be  not 
less  than  the  weight  of  the  pile  to  be  driven. 

For  driving  either  concrete  or  wood  piles,  the  minimum  weight  of  the  entire  ham- 
mer, the  weight  of  the  striking  part,  and  the  length  of  stroke  should,  where  practicable, 
be  specified  for  each  project. 

Where  hard  driving  is  encountered,  it  may  be  necessary  to  reduce  the  length  of 
stroke  to  avoid  injury  to  the  pile. 


Wood    B  r  i  dges   and   Trestles 


283 


Gravity  Hammers 

For  driving  either  concrete  or  wood  piles,  the  weight  of  the  striking  ram  shall  be 

not  less  than  3,000  pounds  and  the  drop  shall  be  so  regulated  as  to  obtain  the  desired 

penetration  without  appreciable  injury  to  the  pile. 

Weights  of  Hammers  To  Be  Used 

In  1936  the  committee  canvassed  a  number  of  agencies  actively  engaged  in  driving 
piles  to  ascertain  their  methods  of  determining  proper  weights  of  hammer  to  be  used 
in  actual  pile  driving  pra.ctice.  A  summary  of  the  replies  received  and  a  comparison  of 
the  more  common  pile  bearing  formulas  with  the  results  of  available  load  tests  were 
included  in  the  report  for  that  year. 

Your  committee  has  tabulated  the  supporting  capacity  of  piles  of  different  weights 
driven  by  various  steam  hammers  in  common  use.  The  tables  are  based  on  the  Engineer- 
ing News  or  Wellington  formula  modified  to  take  into  account  the  efficiency  of  a  hammer 
blow  for  different  weights  of  piles.  The  efficiency  factor  is  determined  by  the  formula 


TIMBER  PILES  -  WEIGHT  PER  LIN.  FOOT 


Pino 

Average 
Dla. 

:         Wt. 
:   Untreated 

: 

:       v;t . 

:   Treated 

Average 

Dla. 

:         Wt . 
;   Untreated 

:       Wt . 
:   Treated 

10" 

•          26# 

33# 

|! 

I         13J" 

48# 

i        60# 

lOi" 

29 

36          j         14" 

51 

64 

11" 

32 

40          '■         I4i" 

55 

69 

lU" 

35 

43           i          15" 

59 

74 

12"           ! 

38 

47 

15*"  ; 

63 

79 

12^      '•■ 

41             i 

51 

16"    ; 

67            : 

84 

13"         i 

44            : 

55 

lei"      : 

71             : 

89 

CONCRETE 

PILES    -  WEIGHT 

Pl'J? 

LIN.    FOOT 

16"  OctaKonai 

24" 

Octag 

onal 

Length   -  Ft. 

:    Weight 

Length 

-   Ft. 

:   V.'elght 

20   -   25 

218# 

20 

:      427# 

26    -   30 

280 

25 

444 

31    -   35 

223 

30 

452 

36    -   40 

228 

-35 

459 

41-50        • 

233 

40 

464 

51-55        ! 

244 

45 

468 

50 

470 

55                 :' 

474 

60                  J 

475 

284 


Wood    Bridges   and    Trestles 


of  A.  Hilley,  as  given  in  the  report  of  this  committee  for  1936,  and  depends  upon  the 
ratio  of  the  weight  of  the  pile  to  that  of  the  driving  ram. 


Formulas 


(Engineering  News) 

or  5  ^ 

5+0.1  L 


0.1 


L  c=  Pile  capacity  in  pounds 
E  =  Kinetic  energy  of  blow  in  ft.  lb. 
5  ^  Penetration  in  inches  under  one  blow 
Above  formula  provides  safety  factor 
of    6,    and    assumes    100    percent 
efficiency. 


(A.  Hilley) 


1  + 


+ 


1+- 


e  =  Efficiency  of    blow 
c  =  Coefficient  of  restitution  : 
p  ^=  Weight  of  pile  and  anvil 
w  =  Weight  of  ram. 


0.25 


Tabulated  blows  per  foot  required  =:  12  -f-  (5  X  e) 


McKIERHAH-TERRY  #lX-B-5  DOUBLK-ACTING   PILE  HAMMER 

Rated   energy  =  19150'#  at  95  blows   per  minute 
Weieht   of  ram     •  5000# 
Weight   of  anvU  =     820# 


Pile  Capacity 

15-T.  :  20-T.  :  25-T.  :  30-T.  :  35-T.  :  40-T. 

:   e 

U'clght  01'  Pile 

Requirec"  Blows  per  Foot 

cJOO# 

Ik: 

18 

23 

29 

55 

:   41 

:  .770 

1000 

13 

19 

24 

50 

36 

!    42 

: 

:  .749 

2000 

14 

21 

27 

34 

:   41 

:   48 

.662 

3000 

IG 

24 

50 

38 

45 

:   53 

•  .594 

4000 

18 

26 

35 

42 

50 

: 

:   58 

.540 

5000 

19 

20 

36 

45 

54 

:    64 

■  .495 

6000 

21 

51 

39 

49 

59 

69 

.459 

7000 

22 

33 

42 

52 

63 

74 

.428 

8000 

24 

35 

45 

56 

67 

79 

.401 

9000 

25 

3'; 

45 

59 

71 

84 

.379 

10000 

26 

3'j 

50 

62 

74 

88 

.359 

11000 

28 

41 

53 

66 

76 

93 

.340 

12000 

29 

43 

55 

69 

80 

97 

.326 

13000 

30 

45 

58 

72 

83 

101 

,311 

14000 

32 

47 

60 

75 

87 

106   • 

.299 

15000 

34 

49 

63 

78 

93 

110  : 

.288 

Wood    B  r  i  d  ges    and    Trestles 


285 


McKIERHAN -TERRY  iyiO-B-5  DOUBLE-ACTING   PILE  HAMIIER 

Rated   energy   =  13100'#  at   105  blows   per  minute 
Weight   of  ram     a  3000# 
Weight   of  anvil  =     625# 


Pile  Capacity 

15-T. 

,  20-T. 

25-T. 

30 -T. 

35-T, 

40-T. 

Weight  of  Pile 

Requ 

[red  Blows  per  Foot 

e 

800# 

23 

31 

41 

51 

63 

76 

.699 

1000 

24 

32 

42 

53 

65 

79 

.671 

2000 

29 

38 

50 

63 

78 

94 

.563 

3000 

34 

44 

58 

73 

90 

108 

.487 

4000. 

38 

50 

66 

83 

102 

122 

.431 

5000 

42 

56 

73 

92 

113 

136 

.389 

6000 

46 

61 

80 

100 

123 

148 

.356 

7000 

50 

66 

86 

108 

134 

161 

.327 

8000 

54 

71 

93 

116 

144 

173 

.305 

9000 

57 

76 

99 

124 

153 

184 

.287 

10000 

61 

81 

105 

132 

163 

197 

.268 

11000 

64 

85 

111 

139 

172 

207 

.255 

12000 

67 

89 

116 

145 

180 

217 

.243 

MoKIERNAN-TERRY  #9-B-3  DOUBLE-ACTING  PILE  HAMMER 

Rated    energy  =  8750'#  at   145  blows   per  minute 
Weight   of  ram     =  1600# 
Weicht   of  anvil  =     40C^ 


Pile  Capacity 

15-T.  :  20-T.  :  25-T.  :  30-T.  :  35-T.  :  40-T. 

Weight  of  Pile 

Required  Blows  per  Foot 

800# 

41 

60 

80 

104 

134 

168 

.599 

1000 

44 

64 

85 

111 

142 

179 

•  .562 

2000 

57 

82 

110 

143 

183 

230 

.437 

3000 

68 

98 

132 

172 

220 

277 

.363 

4000 

79 

114 

153 

199 

256 

.313 

5000 

90 

128 

173 

226 

289 

t 

:  .277 

6000 

99 

142 

192 

250 

: 

:  .250 

7000 

108 

156 

210 

273 

.229 

8000 

117 

168 

226 

295 

.212 

9000 

125 

179 

241 

.199 

10000 

133 

190 

256 

: 

: 

:  .187 

286 


Wood    Bridges    and    Trestles 


McKIEFiNAM-TERRY   #9-B-3   DOUBLE-ACTING    PILR   HAMi^lER 

Rated   enercy   =  &100'//  at   140  blows   per  minute 
'. eight   of  ram     -  1600# 
Vielcht  of  anvil    =     400# 


Pile  Capacity 

15-T. 

20-T.  :  25-T. 

30-T. 

35-T. 

40-T. 

v.elRht  of  Pile 

Required  Blows  per  Foot 

800# 

46 

66 

89 

118 

153 

196 

.599 

1000 

49 

70 

95 

126 

163 

209 

.562 

2000 

63 

90 

123 

161 

210 

268 

.437 

3000 

75 

108 

147 

194 

252 

.363 

4000 

87 

126 

171 

225 

292 

.313 

5000 

99 

142 

193 

254 

.277 

6000 

109 

157 

214 

282 

.250 

7000 

119 

172 

234 

.229 

8000 

129 

186 

252 

.212 

9000 

137 

197 

268 

.199 

10000 

146 

210 

286 

.187 

MoKIERNAN-TERRY  #9-B-3  DOUBLE-ACTING  PILE  EiVMMER 

.Rated. energy  =  7500'#  at   135  blows   per  minute 
Weight  of  ram     =  1600# 
Weight  of  anvil  =     400# 


Plla  C«D«olty  1 

! 

15-T.  : 

20-T. 

• 
25-T. 

30-T. 

35-T. 

40-T. 

' 

WeiKht  of  Pile 

RequJ 

red  Blow3  jier  Foot 

800#     1 

50 

73 

100 

134 

176 

230 

.599 

1000 

53 

78 

107 

143 

187 

244 

.562 

2000 

69 

100 

137 

183 

241 

.437' 

3000 

83 

120 

165 

220 

290 

.363 

4000 

96 

140 

192 

"256  . 

.313 

5000 

108 

158 

216 

288 

.277 

6000 

120 

175 

•  240  : 

.250 

7000 

131 

191 

262 

.229 

8000 

:  142 

•  206 

283 

.212 

9000 

: 

:  ISO 

219 

300 

.199 

10000 

:   161 

!   234 

: 

: 

-.187 

I 


Wood    Bridges   and   Trestles 


287 


McKIERNAM -TERRY  #9-B-5  DOnBLE-ACTING   PILE  HAMMER 

Rated   energy  =  6800' #  at   130  blows   per   minute 
Weight   of  ram     =  1600# 
weight   of  anvU  -     400# 


Pile  Capacity 

15-T. 

20-T. 

25-T. 

;      : 

30-T.  :  35-T;  :  40-T. 

Weight  of  Pile 

Required  Blows  per  Foot 

800# 

57 

84 

116 

153 

213   :   287 

.599 

1000 

60 

89 

124 

168 

227   : 

.562 

2000 

78 

115 

160 

216 

292   : 

.437 

3000 

93 

138 

192 

260 

.363 

4000 

109 

160 

223 

300 

: 

.313 

5000 

123 

180 

252 

,277 

6000 

136 

200 

279 

.250 

7000 

148 

218 

.229 

8000 

160 

236 

.212 

9000 

170 

251 

.199 

10000 

181 

268 

.187 

VULCAN  #0R   SINGLE-ACTING   PILE   HAMMER 

Rated   energy   =   30225'#  at   50  blows    per   minute 
Weight   of  ram     =  9300# 
Weight   of  anvil   s  2075#   (solid  base) 


Pile  Capacity 

20-T. 

25-T. 

30-T, 

35-T. 

40-T. 

45-T. 

50 -T, 

55-T, 

60-T. 

Weight  of  Pile 

Req^uired 

Blows 

per  Foot 

• 

8000# 

17 

21 

26 

31 

36 

41 

46 

52 

58 

.514 

9000 

17 

22 

27 

32 

37 

43 

48 

54 

60 

.494 

10000 

18 

23 

28 

33 

39 

45 

51 

57 

63 

.471 

11000 

19 

24 

30 

35 

40 

46 

53 

59 

65 

.453 

12000 

20 

25 

31 

36 

42 

48 

55 

61 

68 

.436 

13000 

20 

26 

32 

37 

43 

50 

57 

63 

71 

.421 

14000 

21 

27 

33 

39 

45 

52 

59 

65 

73 

,407 

15000 

22 

28 

34 

40 

47 

54 

61 

68 

76 

,393 

16000 

22 

29 

35 

41 

48 

55 

63 

70 

79 

,380 

17000 

23 

30 

36 

43 

50 

57 

64 

72 

81 

,370 

18000 

24 

31 

37 

44 

51 

58 

66 

74 

83 

.359 

19000 

24 

31 

38 

45 

52 

60 

68 

76 

85 

.350 

20000 

25 

32 

40 

46 

: 

54 

G2 

70 

79 

88 

.340 

22000 

26 

34 

41 

49 

56 

65 

"  74 

83 

92 

,324 

24000 

28 

36 

43 

51 

59 

68 

78 

87 

97 

,308 

26000 

29 

37 

45 

53 

62 

71 

81 

90 

100 

.296 

28000 

30 

38 

47 

55 

64 

74 

D3 

93 

104 

.285 

288 


Wood   Bridges   and   Trestles 


VULCAN  #0  SINGLE-ACTING  I'lLE  HAMMER 

Rated  energy  =  24375'#  at  50  blows  per  minute 
Weight    of  ram     =  7500# 
Weight   of  anvil  =  2075# 


Pile  Capacity 

20-T. 

25-T. 

30-T. 

35-T. 

'40-T. 

:45-T. 

:50-T. 

: 
:56-T. 

: 
:60-T, 

t 

1   , 

WelKht  of  Pile- 

Re 

lulred 

Blows 

per  Foot 

t   • 

: 

5000# 

20 

: 

25 

31 

37 

:   43 

:  49 

56 

i 

•   64 

i  71 

! 

:  .547 

6000 

21 

27 

33 

:   39 

:  46 

•   53 

60 

68 

:  76 

:  .514 

7000 

22 

28 

35 

:   41 

:  48 

: 

55 

63 

72 

:  80 

:  .487 

8000 

23 

29 

37 

:  43 

■   51 

58 

67 

•   75 

:  84 

:  .464 

9000 

:   24 

:   31 

I   38 

:  45 

53 

61 

70 

:   79 

i  88 

:  .442 

10000 

•   25 

i   32 

:   40 

47 

56 

64 

!  73 

i  83 

:  92 

:  .422 

11000 

26 

34 

42 

50 

58 

67 

76 

86 

.   96 

.405 

12000 

•   28 

35 

44 

52 

61 

70 

80 

90 

:  100 

.387 

13000 

1   29 

:  37 

45 

54 

63 

73 

■  83 

:   94 

104 

:  .373 

14000 

! 

30 

38 

47 

55 

65 

75 

85 

97 

•  108 

.362 

15000 

•   31 

39 

49 

58 

68 

78 

89 

•  100 

112 

.349 

16000 

32 

40 

50 

60 

70 

81 

92 

104 

116 

.337 

17000 

33 

42 

52 

62 

72 

83 

95 

107 

119 

.327 

18000 

34 

43 

53 

64 

74 

86 

98 

110 

123 

.317 

19000 

35 

45 

55 

65 

77 

88 

100 

113 

126 

.308 

20000 

36 

.  46 

56 

67 

79 

91 

103 

116 

130 

.300 

22000 

38 

48 

59 

70 

82 

95 

108 

122 

136 

.286 

24000 

40 

50 

62 

74 

87 

100 

113  : 

128 

143 

.272 

26000 

41 

53 

65 

77 

91 

104 

118 

134 

149  '. 

,261 

28000 

43 

55 

68 

80 

95 

108 

123 

140  : 

156  i 

.250 

Wood    Bridges   and   Trestles 


289 


YULCAM  #1  SIMGLE-ACTING  PILE  HAKi,a:R 

Rated  energy  =  15000'#  at  60  blows  per  minute 
Weight  of  ran  -  5000# 
Weleht  or  anvil  =  360# 


Pile  Capacity 

:15-T.:20-T.:25-T.:30-T.:35-T.:40-T.;45-T.:50-T. 

Weight  of  Pile 

Required  Blows  per  Foot 

5000# 

26 

36 

:   47 

:   58 

71 

:   85 

:  100 

:  117 

.514 

6000 

.   28 

39 

;  51 

:  63 

77 

:   92 

109 

:  126 

.475 

7000 

30 

!   42 

54 

: 

•   68 

82 

99. 

117 

136 

.442 

8000 

32 

45 

58 

73 

88 

106 

125 

145 

.414 

9000 

34 

48 

62 

77 

93 

112 

132 

154 

.390 

10000 

36 

50 

66 

82 

99 

119 

141 

164 

.368 

11000 

38 

53 

69 

86 

104 

125 

147 

172 

.350 

12000 

40 

56 

72 

90 

110 

131 

155 

180 

.333 

13000 

42 

5S 

75 

94  " 

114 

137 

162 

188 

.319 

14000      : 

44 

61 

79 

98 

119 

143  ! 

169 

197  : 

.305 

15000 

46 

63 

82 

103 

124 

149  : 

176 

205  : 

.293 

VULCAN  #2  SINGLF.-ACTIUG  PILE  HAMMER 

Rated  energy  =  7250'#  at  70  blows  pep  minute 
Weight  of  ram   =  3000# 
weight  of  anvil  =  360# 


Pile  Capacity 

15-T. 

20-T.  :  25-T.  :  30-T. 

•  35-T. 

:  40-T. 

'..plf.ht  of  Pile 

Required  Blows  per  Foot 

800# 

42 

62 

85 

114 

152 

198 

:  .739 

1000 

44 

65 

89 

120 

159 

206 

.704 

2000 

53 

78 

106 

143 

191 

249 

.589 

3000 

62 

91 

124 

167 

222 

290 

.505 

4000 

70  . 

102 

140 

190 

252 

.445 

5000 

78 

115 

157 

213 

283 

.398 

6000 

86 

126 

172 

233 

.363 

7000 

93 

137 

187 

253 

.334 

8000 

100 

148 

202 

272 

.310 

9000 

107 

158 

216 

291 

.290 

10000 

115 

163 

230 

j  .272 

290 


Wood    Bridges   and    Trestles 


VULCAN   #1800   LIFPL,=}r.KTIAL-ACTIKG    PILE   HAi'/j/lER 

Rated   energy   =  3600' ;?  at   150  blows   per  minute 
Weight   of  ram     =  1800# 
ViTelpht    of  anvil  =      135# 


Pile  Capacity 

15-T.  :  20-T.  :  25-T. 

VJelRht  of  Pile 

Required  Blowa  per  Foot 

800# 

126 

221   : 

.678 

1000 

135 

235   : 

.637 

2000 

174 

.492 

3000 

211 

.405 

4000 

246 

.348 

5000 

280 

.306 

6000 

.275 

7000 

.251 

8000 

.232 

9000 

.217 

10000 

.204 

BROV/NHOIST  liUORT   STROKE   EOUBLE-ACTIKG    PILE    HAMMER 


Rated   energy  =  6000'#  at   150  blows   per  minute 
Weight   of  ram  =  1600# 
Weight  of  anvil  =     150# 


Pile  Capacity 

15-T. 

20-T. 

25-T. 

•30-T. 

35-T. 

Weight  of  ?lle 

Required  Blows  per  Foot 

800# 

62 

93 

132 

185 

258 

.648 

1000 

66 

99 

141 

198 

276 

.607 

2000 

87 

130 

185 

260 

.463 

3000 

106 

159 

227 

.378 

4000 

124 

186 

266 

.323 

5000 

140 

211 

.285 

6000 

156 

235 

.256 

7000 

170 

255 

.235 

•8000 

•   185 

278 

.216 

9000 

198 

297 

.202 

10000 

210 

.190 

Wood    Bridges   and    Trestles 


291 


Report  on  Assignment  8 

Fireproofing  Wood  Bridges  and  Trestles  Including  the 
Placing  of  Fire  Stops 

J.  V.  Johnston   (chairman,  subcommittee),  M.  W.  Beach,  H.  F.  Bober,  C.  J.  Hogue, 
J.  E.  Myer. 

Your  committee  has  given  this  important  subject  further  consideration.  It  is  certain 
that  so  long  as  timber,  treated  or  untreated,  is  used  in  the  construction  of  these  struc- 
tures, there  will  be  hazard  of  fire,  and  adequate  protective  measures  must  be  taken  to 
prevent  fires,  keep  them  from  spreading  and  limit  the  area  that  can  be  damaged. 

Whether  or  not  fireproofing  pays,  might  be  an  open  question.  The  expense  incurred 
in  replacing  a  burned  trestle,  which  caused  delays  in  train  operation,  and  which  might 
have  been  the  cause  of  a  disastrous  wreck,  can  be  easily  determined;  but  it  cannot  defi- 
nitely be  said  that  a  fireproofed  bridge  has  actually  prevented  such  an  occurrence  and 
saved  a  certain  amount  of  expense. 

There  are  numerous  ways  of  decreasing  the  fire  hazard  at  trestles.  The  more  common 
methods  in  the  order  of  efficiency,  are  as  follows: 

(a)  Ballasted  deck  on  trestle 

(b)  Metal  covering  over  deck 

(c)  Bituminous  mastic  covering  over  deck  with  sand  or  limestone  chips 

(d)  Metal  covering  over  stringers  and  caps 

(e)  Fire  retardant  salts  or  resisting  paint 

The  cost  of  these  methods  varies  directly  with  the  efficiency. 

Your  committee  recommends  that  Paragraphs  2,  5  and  6,  under  the  heading  "Best 
Method  of  Fireproofing  Wood  Bridges  and  Trestles"  appearing  on  page  7-66  of  the 
Manual,  be  revised  as  presented  below,  and  that  Figures  1,  2,  3  and  4  be  approved  for 
pubUcation  as  a  part  thereof. 

50  ft 

4  Panels  or  not  (ess  than  ^5 


Fill 
/'Noturol    Ground 


Elevation 
Fig.  1.— Earth  Fill  Break  in  a  Long  Trestle. 

2.  The  decks  of  wood  bridges  should  be  protected  from  fires  starting  from  hot  coals 
dropped  from  locomotives,  preferably  by  adopting  ballasted  deck  trestles;  or  by  cover- 
ing the  deck  or  the  stringers  and  caps  with  rust  resisting  sheet  metal.  Bituminous  mastic 
with  sand  or  limestone  chips  may  be  used  similarly  to  deflect  any  heated  particles  fall- 
ing on  the  surfaces  of  the  deck.  The  application  of  fire  retardant  salts  or  resisting  paint 
to  untreated  timber  in  open  deck  trestles  may  also  be  employed. 

S.  Water  barrels  with  buckets  should  be  maintained  on  all  timber  bridges,  one 
barrel  each  for  structures  up  to  SO  feet  long  and  one  additional  barrel  for  each  addi- 


292 


Wood    Bridges    and    Trestles 


le 

■0" 

1-0        6ff        _j 

r,                       '1 

Cover  Ties 

With  '206a 

Iv  Iron 

IMMC^NM 

y\,.N 

?inr 

5-2 

-   '  im     iw  '       \ 

Z>       / 

2;- j 

^ 

IZ-O' 

X 

^ 

c 

- 

0 

■D 

\ 

ft) 
a 

S 

1^ 

\ 

4) 

it: 

10 

■^ 
o 

-D    - 

E 

--JD 

£ 

\ 

(U 

(VJ 

to 

\ 

i. 

o 

c 

1^   - 

J_b. 

,  \ 

o 

1 

<•) 

■n 

IT 

\ 

V 

-J 

— 

4J 

\ 

_l 

\ 

p-'- 

-"—I 

* 

_. 

- 

■^            E 

'levation 
Open  Deck. 

1        r-1         r-T        r-T        r 

1 

^ 

_- 

V- 

^ 

Bol lasted  Deck  Similar 

L 

J 

w 

u 

20-0" 


Section 

open    DecK 


Section 

OoHQS+ed    OecK 


6  ft-        1-0        £ft 


Cover    ties  with*20Qalv  iron 


Elevation  Section 

Fig.  2.— Reinforced  Concrete  Piers  and  Bents  as  Fire  Stops. 


Wood    Bridges   and    Trestles 


293 


A-i 


tlUj;       ,;1 


EMM 


Half-Section  A-A 


n^r 


kJ 


Half  Section  Elevation 

Fig.  3. — Wood  Bents  Faced  with  Fire  Resisting  Material. 


}  fZ.j".g;-3"lO»'L6 


JJ-l. 


i^ 


BITUMINOUS  CONCRETE  OR  MASTIC 

C8'"?{'l87»».l0'5  LS 


TIE   D23    ^l 


ULERS    S-6.10     t2S-3'4.i 


i_i 


OlTUMINOUS  PBIMINe  CliAT 


i 


Fig.  4. — Application  of  Mastic  Material  to  Open  Deck  Structures. 

tional  ISO  feet.  For  creosoted  structures,  sand  boxes  with  water  tight  covers  for  keeping 
the  sand  dry  are  recommended,  dry  sand  being  more  effective  than  water  in  extinguishing 
small  fires  on  creosoted  structures. 

6.  On  long  bridges  it  is  advisable  to  protect  the  bridge  by  introducing  fire  barriers 
at  intervals  of  about  400  feet.  This  will  reduce  the  hazard  by  preventing  loss  of  the 
entire  structure  in  case  of  fire.  Such  barriers  for  open  deck  and  ballasted  deck  wood 
trestles  may  be  grouped  by  types  of  construction,  as  follows: 

1.  Earth  fill  within  long  trestles 

2.  Reinforced  concrete  piers  or  concrete  pile  bents 

3.  Facing  bents  with  fire  resisting  materials 

4.  Application  of  mastic  materials  to  open  deck  structures 


Report  of  Committee  8 — Masonry 


J.  F.  Leonard,  Chairman, 

F.  E.  Bates 

G.  E.  Boyd 

F.  W.  Capp 
Maurice  Coburn 
t.  l.  condron 
Hardy  Cross 

G.  H.  Dayett 
Theodore  Doll 
G.  F.  Eberly 
W.  K.  Hatt 
Reuben  Hayes 
Meyer  Hirschthal 
L.  H.  Hornsby 


M.  L.  Johnson 
J.  E.  Kalinka 
W.  A.  Kingman 
J.  A.  Lahmer 
C.  P.  Marsh 
R.  L.  Mays 
L.  M.  Morris 
Roscoe  Owen 

0.  V.  Parsons 

1.  L.  Pyle 
W.  M.  Ray 

J.   L.   RiPPEY 

F.  B.  Robins 

G.  E.  Robinson 


A.  N.  Laird,  Vice-Chairman, 

C.  P.  Schantz 

G.  E.  Shaw 

G.  R.  Smiley 

A.  W.  Smith 

C.  H.  Splitstone 

E.  O.  Sweetser 

J.  H.  Titus 

Jamison  Vawter 

L.  W.  Walter 

C.  A.  Whipple 

W.  R.  Wilson 

J.  J.  Yates 

Committee 


To  the  American  Railway  Engineering  Association: 

Your  committee  presents  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 

Progress  report,  embracing  minor  revisions  in  the  Specifications  for  Portland  Cement 
Concrete  and  the  Specifications  for  Shotcrete   page  296 

other  revisions  of  the  Manual  are  presented  in  the  reports  on  Assignments  2,  6 
and  14. 

2.  Specifications  and  principles  of  design  of  plain  and  reinforced  concrete  for  use 
in  railway  bridges,  buildings  and  culverts,  collaborating  with  Committees  1 — Roadway 
and  Ballast,  5— Track,  6— Buildings,  7— Wood  Bridges  and  Trestles,  13— Water  Service, 
Fire  Protection  and  Sanitation,  and  15— Iron  and  Steel  Structures. 

(a)  Composite  columns  and  pipe  columns. 

Progress  report,  embracing  recommended  revisions  of  the  Manual page  298 

(b)  Reinforced  concrete  box  culverts. 
No  report. 

(c)  Concrete  bridge  deck  slabs  of  the  non-ballast  type,  collaborating  with  Com- 
mittee S — Track. 

No  report. 

3.  Progress  in  the  science  and  art  of  concrete  manufacture. 

Needed  adjustments  in  field  practice  to  use  present-day  cements  to  best  advantage. 
Progress  report,  presented  as  information  P^g^  ^^^ 

4.  Maintain  contact  with  Joint  Committee  on  Concrete  and  Reinforced  Concrete. 
The  report  of  the  Joint  Committee  was  published  as  information  in  Bulletin  419, 

Part  I,  for  September-October,   1940,  and  will  appear  on  page  27   in   the  Monograph 
Section  of  the  Proceedings  for  1941. 

5.  Specifications  for  foundations,  including  excavation,  cofferdam,  piling,  etc.,  col- 
laborating with  Committee  1— Roadway  and  Ballast  on  soil  mechanics,  and  with  Com- 
mittee 7— Wood  Bridges  and  Trestles  on  bearing  power  of  wood  piles  and  pile  driving. 

No  report. 

6.  Methods  and  practices  of  hning  and  relining  tunnels,  collaborating  with 
Committee  1 — Roadway  and  Ballast. 


Bulletin  422,  January,  1941. 


295 


296 Masonry 

Two  reports  are  presented;  one  for  lining  tunnels  with  liner  plates  and  shotcrete, 
and  the  other  for  an  alternate  floor  of  the  non-ballast  type  page  307 

7.  Review  specifications  for  overhead  highway  bridges  of  the  American  Association 
of  State  Highway  Officials,  insofar  as  they  relate  to  masonry,  conferring  with  that 
association,  and  Committee  IS — Iron  and  Steel  Structures. 

No  report. 

8.  Progress  in  cement  manufacture  and  testing. 

A  factual  report  is  presented  as  information,  describing  the  five  types  of  Portland 
cement  recently  adopted  by  the  ASTM  as  tentative  page  310 

9.  Specifications  for  culvert  pipe. 

The  specifications  for  placing  which  were  submitted  last  year  as  information  are 
now  proposed  for  inclusion  in  the  Manual   page  315 

10.  Bibliography  and  review  of  current  engineering  literature  pertaining  to  railroad 
masonry  work. 

No  report. 

11.  Pressure  grouting. 

Specifications  for  Solidification  of  Masonry  Structures  by  Pressure  Grouting  are 
submitted  as  information    page  319 

12.  Specifications  for  concrete  and  reinforced  concrete  railroad  bridges  and  other 
structures. 

Brief  progress  report,  submitted  as  information   page  321 

13.  Specifications  for  test  borings,  collaborating  with  Committee  1 — Roadway  and 
Ballast. 

Progress  report,  submitted  as  information page  321 

14.  Specifications  for  concrete  placed  under  water. 

Specifications  are  submitted  for  adoption  to  replace  matter  now  in  the 
Manual    page  332 

15.  Durability  of  concrete. 

Progress  report,  submitted  as  information   page  335 

The  Committee  on  Masonry, 

J.  F.  Leonard,  Chairman. 


Report  on  Assignment  1 
Revision  o£  Manual 

G.  E.  Boyd  (chairman,  subcommittee),  T.  L.  Condron,  Meyer  Hirschthal,  L.  H.  Hornsby, 
J.  A.  Lahmer,  F.  B.  Robins,  C.  P.  Schantz,  G.  E.  Shaw,  C.  A.  Whipple,  J.  J.  Yates. 

The  committee  recommends  the  following  revisions  to  Article  102.1  appearing  on 
pages  8-3  and  8-4  of  the  Manual: 

Section  1,  change  the  ASTM  designation  from  D75-22  to  D7S-39T. 

Section  2,  Paragraph  (a),  change  ASTM  designation  from  C87-36  to  C87-39. 

Section  2,  Paragraph  (d),  change  the  ASTM  designation  from  C123-36T  to 
C123-39. 

Section  2,  Paragraph  (e),  change  the  ASTM  designation  from  C117-35T  to 
C117-37. 

Section  2,  Paragraph  (h),  the  heading  of  this  paragraph  should  be  in  italics  to  con- 
form to  the  style  followed  in  the  remaining  paragraphs  of  this  section.  Also  change  the 
ASTM  designation  from  C87-36  to  C87-39. 


Masonry 297 

Section  2,  Paragraph  (i),  Subdivisions  (1)  and  (2),  change  the  ASTM  designation 
from  C88-35T  and  C89-35T  to  C88-39T. 

Section  2,  Paragraph  (j),  Subdivision  (2),  change  the  ASTM  designation  from 
D289-28T  to  D289-37T. 

Section  2,  Paragraph  (k),  change  the  ASTM  designation  from  C29-27  to  C29-39. 

The  committee  recommends  changes  in  the  ASTM  designations  in  Article  104,  Sec- 
tion 1  on  page  8-4  as  follows: 

For  Billet  Steel  Concrete  Reinforcement  Bars,  from  A15-35  to  AlS-39. 
For  Axle  Steel  Concrete  Reinforcement  Bars,  from  A160-36  to  A160-39. 
For  Cast  Iron  Pipe  and  Special  Castings,  from  A44-04  to  A44-39T. 

The  committee  also  recommends  the  deletion  of  the  separate  references  to  steel  for 
bridges  and  buildings  in  this  section  and  the  substitution  of  a  new  reference. 

Present  Form 

Steel  for  Bridges    A7-36 

Steel  for  Buildings     A9-36 

Proposed  Form 
Steel  for  Bridges  and  Buildings  A7-39 

The  committee  recommends  that  the  ASTM  designation  for  High  Early  Strength 
Portland  Cement  on  page  8-5  of  the  Manual  be  changed  from  C74~38  to  C74-39. 

The  committee  also  recommends  the  following  revisions  in  this  specification: 

Change  the  tolerance  for  loss  of  ignition  in  the  table  in  Section  1,  from  0.25  to  0.20 
and  change  sulfuric  anhydride  to  sulfur  trioxide. 

Delete  the  last  sentence  in  Section  3,  reading  Final  set  shall  be  attained  within 
10  hours. 

In  the  paragraph  on  Compressive  Strength,  Section  9,  change  the  ASTM  designation 
from  C109-34T  to  C109-37T  and  delete  the  reference. 

Delete  the  footnote  on  page  8-7. 

The  committee  recommends  that  Section  5  of  the  Specification  for  Shotcrete,  which 
appears  on  page  8-96  of  the  Manual,  be  deleted  and  that  a  new  section  be  substituted 
as  follows: 

Present  Form 

5.  Shotcrete  shall  consist  of  a  mixture  of  Portland  cement  and  sand,  the  fineness 
modulus  of  which  shall  be  between  2.25  and  2.75,  in  the  proportion  of  1  bag  of  cement 
to  3  cubic  feet  of  sand  (dry  loose  measurement,  diie  allowance  being  made  for  bulking), 
placed  by  pneumatic  pressure  through  a  Shotcrete  machine,  with  proper  amount  of 
water  for  hydration  applied  in  the  mixing  nozzle.  The  cement  and  sand  shall  be  pre- 
mixed  dry  in  a  batch  mixer  and  screened  through  a  J4  i^<^^  screen  before  being  placed 
in  the  hopper  of  the  Shotcrete  machine.  The  sand  as  used  shall  have  only  the  normal 
water  content,  that  is,  from  3  percent  to  8  percent  of  moisture. 

Proposed  Form 

5.  (a)  Shotcrete  shall  consist  of  a  mixture  of  Portland  cement  and  sand,  in  the 
proportion  of  1  bag  of  cement  to  3  cubic  feet  of  sand  (dry  loose  measurement,  due 
allowance  being  made  for  bulking),  placed  by  pneumatic  pressure  through  a  Shotcrete 
machine,  with  the  proper  amount  of  water  for  hydration  applied  in  the  mixing  nozzle. 


298 Masonry 

The  cement  and  sand  shall  be  pre-mixed  dry  in  a  batch  mixer  and  screened  through 
a  %  inch  screen  before  being  placed  in  the  hopper  of  the  Shotcrete  machine.  The  sand 
as  used  shall  have  only  the  normal  water  content,  that  is,  from  3  percent  to  8  percent 
of  moisture. 

S.  (b)  Sand  shall  be  well  graded.  The  particles  shall  range  in  size  within  the  limits 
below,  percentage  by  weight: 

Percent 
Sieve  Size  Retained 

No.  4       0 

No.  8       S-30 

No.  16     15^0 

No.  30      3S-SS 

No.  50     6S-8S 

No.  100    92-98 

The  fineness  modulus  shall  be  between  2.25  and  2.75. 


Report  on  Assignment  2  (a) 

Composite  Columns  and  Pipe  Columns 

A.  N.  Laird  (chairman,  subcommittee),  Hardy  Cross,  G.  H.  Dayett,  Theodore  Doll, 
Meyer  Hirschthal,  J.  E.  KaUnka,  J.  L.  Rippey,  C.  P.  Schantz,  A.  W.  Smith,  E.  O. 
Sweetser,  Jamison  Vawter,  W.  R.  Wilson. 

The  committee  recommends  that  subject  matter  of  Section  307,  Design  of  Columns, 
of  the  Specifications  for  Portland  Cement  Concrete,  Plain  and  Reinforced,  be  withdrawn 
and  that  it  be  replaced  by  new  Section  307,  Design  of  Columns. 

Present  Form 
Reference  is  made  to  present  Section  307  on  pages  8-49,  50  and  51  of  the  Manual. 

Proposed  Form 

307— DESIGN  OF  COLUMNS* 
1.  General 

(a)  The  following  recommendations  are  based  largely  on  the  results  of  the  extensive 
American  Concrete  Institute  Column  Investigation.  Recognizing  the  presence  of  undesir- 
able column  shortening  due  to  creep  and  shrinkage  when  small  percentages  of  vertical 
steel  are  used,  the  minimum  value  is  set  at  1  percent;  furthermore,  a  varying  factor  of 
safety  is  used,  ranging,  for  axially  loaded  spiral  columns,  from  about  3.6  for  p  =  0.01, 
to  2.75  for  p  =  0.08.  A  similar  variation  from  about  4.5  for  p  =  0.01,  to  4.0  for  p  <=  0.04 
is  used  with  tied  columns. 

(b)  The  formula  for  spiral  columns  is  based  upon  recognition  of  the  fact  that  the 
strength  produced  by  spirals  is  accompanied  by  spalling  of  the  column  shell  and  excessive 
column  shortening,  hence  the  spiral  is  utilized  only  as  a  toughening  element  or  an  insur- 
ance against  a  sudden  and  complete  collapse  of  the  column.  With  spiral  reinforcement 


*  Section  307  conforms  substantially  to  Sections  851-862  inclusive,  of  the  Report  of  the  Joint 
Committee  on  Standard  Specifications  for  Concrete  and  Reinforced  Concrete  as  submitted  to  the  con- 
stituent organizations,  June  1940  (AREA  Proceedings  for  1941,  Vol.  42,  p.  27  of  the  Monograph 
Section.) 


Masonry 299 

provided,  which  is  somewhat  stronger  than  the  protective  shell,  these  two  elements  of 
strength  (which  cannot  act  simultaneously)  become  interchangeable,  and  justify  the 
formula  which  uses  the  gross  area  of  column  and  omits  any  reference  to  the  spiral.  The 
formulas  for  tied  and  spiral  columns  are  thus  made  identical,  except  that  the  latter  is 
allowed  25  percent  greater  load-carrying  capacity  because  of  the  presence  of  adequate 
spiral  reinforcement  to  carry  part  of  the  load  if  the  outer  shell  should  spall. 

(c)  The  design  of  long  columns,  both  tied  and  spirally  reinforced,  is  covered  by  a 
single  equation  based  on  the  height-diameter  ratio.  With  the  test  data  available,  no 
increase  in  accuracy  would  be  attained  by  basing  the  slenderness  ratio  on  the  radius  of 
gyration. 

(d)  The  treatment  of  bending  in  columns  is  intended  to  correlate  with  the  methods 
for  continuous  beams  and  frames.  Recent  studies  of  creep  indicate  that  the  current 
analyses  of  combined  bending  and  direct  stress  are  not  accurate,  and  that  for  cases  in 
which  the  compressive  stress  governs  the  design,  the  theory  of  the  uncracked  concrete 
section  applies  without  serious  error.  The  permissible  combined  stresses  in  Articles  307 
(10)  and  (11)  are  based  on  test  data;  they  embody  the  fact  that  permissible  bending 
stresses  may  be  greater  than  axial  stresses,  and  they  are  based  on  the  conventional  value 
of  n,  which  produces  the  most  severe  of  the  probable  conditions  that  the  concrete  may 
meet  under  sustained  loading. 

2.  Limiting  Dimensions 

The  following  articles  on  reinforced  concrete  and  composite  columns  (except  Article 
307  (8))  apply  to  a  short  column,  for  which  the  unsupported  length  is  not  greater  than 
10  times  the  least  lateral  dimension.  When  the  unsupported  length  exceeds  this  value  the 
design  should  be  modified  as  shown  in  Article  307  (8).  Principal  columns  in  buildings 
should  have  a  minimum  diameter  or  thickness  of  10  inches.  Posts,  bearing  walls,  piers, 
or  mullions,  that  are  not  continuous  from  story  to  story  should  have  a  minimum  diameter 
or  thickness  of  6  inches. 

3.  Unsupported  Length  of  Columns 

(a)  For  purposes  of  determining  the  limiting  dimensions  of  columns,  the  unsup- 
ported length  of  reinforced  concrete  columns  should  be  taken  as  the  clear  distance 
between  floor  slabs  with  the  following  exceptions: 

1.  In  flat  slab  construction,  it  should  be  the  clear  distance  between  the  floor 
and  the  lower  extremity  of  the  capital. 

2.  In  beam  and  slab  construction,  it  should  be  the  clear  distance  between  the 
floor  and  the  underside  of  the  deepest  beam  framing  into  the  column  in  each 
direction  at  the  next  higher  floor  level. 

3.  In  columns  restrained  laterally  by  struts,  it  should  be  the  clear  distance 
between  consecutive  struts  in  each  vertical  plane;  provided  that  to  be  an  ade- 
quate support,  two  such  struts  should  meet  the  column  at  approximately  the  same 
level  and  the  angle  between  vertical  planes  through  the  struts  should  not  vary 
more  than  30  degrees  from  a  right  angle.  Such  struts  should  be  of  adequate 
dimensions  and  anchorage  to  restrain  the  column  against  lateral  deflection. 

4.  In  columns  restrained  laterally  by  struts  or  beams,  with  brackets  used  at 
the  junction,  it  should  be  the  clear  distance  between  the  floor  and  the  lower  edge 
of  the  bracket,  provided  that  the  bracket  width  equals  that  of  the  beam  or  strut 
and  is  at  least  half  that  of  the  column,  and  provided  further  that  the  face  of  the 
bracket  makes  an  angle  with  the  face  of  the  column  of  at  least  45  degrees. 


300 Masonry 

(b)  For  all  columns,  that  length  should  be  considered  which  produces  the  greatest 
ratio  of  length  to  depth  of  section. 

4.  Spirally  Reinforced  Columns 

(a)  Allowable  Load. — The  maximum  allowable  axial  load,  P,  on  columns  reinforced 
with  longitudinal  bars  and  closely  spaced  spirals  enclosing  a  circular  core  is  given  by 
formula  (36).** 

P  =  0.225/'c^g  +  Asfs   (36) 

Wherein  Ag  =  the  overall  or  gross  area  of  the  column. 

/'c  =  compressive  strength  of  the  concrete,  as  found  by  tests  of  standard  6  by 

12-inch  control  cylinders, 
/s  =  nominal  working  stress  in  vertical  column  reinforcement,  to  be  taken  at 

40  percent  of  the  minimum  specification  value  of  the  yield  point;  viz., 

16,000  pounds  per  square  inch  for  intermediate  grade  steel  and  20,000 

pounds  per  square  inch  for  hard  grade  steel. 

Ae  =^  PgAg. 

pg  =  ratio  of  the  effective  cross-sectional  area  of  vertical  reinforcement  to  the 
gross  area,  Ag. 

(b)  Longitudinal  Reinforcement — Amount  and  Spacing. — The  ratio  Pg  should  not  be 
less  than  0.01  nor  more  than  0.08.  The  minimum  number  of  bars  should  be  six,  and  the 
minimum  diameter  of  bar  should  be  5^  inch.  The  center-to-center  spacing  of  bars  within 
the  periphery  of  the  column  core  should  not  be  less  than  2^  times  the  diameter  for  round 
bars  or  3  times  the  side  dimension  for  square  bars.  The  clear  spacing  between  individual 
bars  or  between  pairs  of  bars  at  lapped  splices  should  not  be  less  than  IJ^  inch  or  IJ^ 
times  the  maximum  size  of  the  coarse  aggregate  used. 

(c)  Splices  in  Longitudinal  Reinforcement. — Where  lapped  splices  in  the  column 
verticals  are  used,  the  minimum  amount  of  lap  should  be  as  follows: 

1.  For  deformed  bars — with  concrete  having  a  strength  of  3,000  pounds  per 
square  inch  or  above,  24  diameters  of  bar  of  intermediate  grade  steel  and  30 
diameters  of  bar  of  hard  grade  steel.  For  bars  of  higher  yield  point,  the  amount 
of  lap  should  be  increased  in  proportion  to  the  nominal  working  stress.  When  the 
concrete  strengths  are  less  than  3,000  pounds  per  square  inch  the  amount  of  lap 
should  be  one-third  greater  than  the  values  just  given. 

2.  For  plain  bars — the  minimum  amount  of  lap  should  be  25  percent  greater 
than  that  specified  for  deformed  bars. 

Where  changes  in  the  cross-section  of  a  column  occur,  the  longitudinal  bars 
should  be  sloped  for  the  full  length  of  the  column,  or  offset  in  a  region  where 
lateral  support  is  afforded  by  concrete  capital,  floor  slab,  metal  ties,  or  reinforcing 
spirals.  Where  bars  are  offset,  the  slope  of  the  inclined  portion  from  the  axis  of 
the  column  should  not  exceed  1  in  6,  and  the  bars  on  each  side  of  the  offset 
should  be  parallel  to  the  axtS  of  the  column. 

Welded  splices  or  other  positive  connections  may  be  used  instead  of  lapped 
splices.  Welded  splices  should  preferably  be  used  in  cases  where  the  bar  diameter 
exceeds  1%  inch.  An  approved  welded  splice  should  be  defined  as  one  in  which 
the  bars  are  butted  and  welded  and  that  will  develop  in  tension  at  least  the  yield 
point  stress  of  the  reinforcing  steel  used. 


**  To  be  logical  the  area  of  the  steel  should  be  subtracted  from  A^  in  the  formula.  However,  the 
effect  of  the  small  area  of  concrete  displaced  by  the  reinforcement  has  been  taken  into  consideration  in 
arriving  at  the  coefficient  0.225  applied  to  /'  . 


Masonry 301 

(d)  Spiral  Reinforcement. — The  ratio  of  spiral  reinforcement,  p',  should  not  be  less 
than  the  value  given  by  Formula  (37). 

/''=0.4s[-^-l]i;^ ^^^^ 

Wherein  p'  =  ratio  of  volume  of  spiral  reinforcement  to  the  volume  of  the  concrete 
core  (out  to  out  of  spirals). 
Ag/Ac'=^  ratio  of  gross  area  to  core  area  of  column. 

/'s  =  useful  limit  stress  of  spiral  reinforcement  to  be  taken  as  40,000  pounds  per 
square  inch  for  hot  rolled  rod  of  intermediate  grade,  50,000  pounds  per 
square  inch  for  hard  grade  and  60,000  pounds  per  square  inch  for  cold 
drawn  wire. 

Spiral  reinforcement  should  consist  of  evenly  spaced  continuous  spirals  held  firmly 
in  place  and  true  to  line  by  at  least  three  vertical  spacer  bars.  For  columns  up  to  18-inch 
core  diameter,  the  minimum  diameter  of  spiral  bars  should  be  %  inch.  For  columns  larger 
than  18-inch  core  diameter,  the  minimum  diameter  of  spiral  bars  should  be  ^  inch. 
Anchorage  of  spiral  reinforcement  should  be  provided  by  IJ^  extra  turns  of  spiral  rod 
or  wire  at  each  end  of  the  spiral  unit.  Splices,  where  necessary,  should  be  made  in  spiral 
rod  or  wire  by  welding  or  by  a  lap  of  1^  turns.  The  center  to  center  spacing  of  the 
spirals  should  not  exceed  one-sixth  of  the  core  diameter.  The  clear  spacing  between 
spirals  should  not  exceed  3  inches  nor  be  less  than  1^  inches  or  1^  times  the  maximum 
size  of  coarse  aggregate  used.  The  column  reinforcement  should  be  protected  everywhere 
by  a  covering  of  concrete  cast  monolithically  with  the  core,  for  which  the  thickness 
should  not  be  less  than  1^  inches  nor  less  than  IJ^  times  the  maximum  size  of  the 
coarse  aggregate,  nor  should  it  be  less  than  required  for  fire  protection  and  weathering. 
The  reinforcing  spiral  should  extend  from  the  floor  level  in  any  story  to  the  level  of  the 
lowest  horizontal  reinforcement  in  the  slab,  drop  panel,  or  beam  above.  In  a  column 
with  a  capital,  it  should  extend  to  the  plane  at  which  the  sectional  area  of  the  capital  is 
twice  that  of  the  column. 

(e)  Limits  of  Column  Section. — For  columns  built  monolithically  with  concrete 
walls  or  piers,  the  outer  boundaries  of  the  column  section  should  be  taken  as  a  circle 
1%  inches  outside  the  column  spiral  or  as  a  square  the  sides  of  which  are  1J4  inches 
outside  the  spiral.  In  case  two  or  more  spirals  are  used  in  such  a  column  the  outer 
boundary  should  be  taken  as  a  rectangle  the  sides  of  which  are  at  any  point  at  least 
lyz  inches  outside  of  the  spirals.  For  these  types  of  spirally  reinforced  columns  the  value 
of  Ag  thus  defined  should  be  used  in  both  Formulas  (36)  and  (37). 

(f)  Equivalent  Circular  Columns.— ks  an  exception  to  the  general  procedure  of 
utilizing  the  full  gross  area  of  the  column  section,  it  should  be  permissible  to  design  a 
circular  column  and  to  build  it  with  a  square,  octagonal,  or  other  shaped  section  of  the 
same  least  lateral  dimension.  In  such  case,  the  allowable  load,  the  gross  area  considered, 
and  the  required  percentages  of  reinforcement  should  be  taken  as  those  of  the  circular 
column. 

5.  Tied  Columns 

(a)  Allowable  Load. — The  maximum  allowable  axial  load  on  columns  reinforced  with 
longitudinal  bars  and  separate  lateral  ties  should  be  SO  percent  of  that  given  by  For- 
mula (36).  The  ratio,  pe,  to  be  considered  in  tied  columns  should  not  be  less  than  0.01 
nor  more  than  0.04.  The  longitudinal  reinforcement  should  consist  of  at  least  four  bars, 
of  mirximum  diameter  of  Y$  inch  placed  with  a  clear  distance  from  the  column  face  of 
not  less  than  1^  inches  plus  the  thickness  of  the  tie,  provided  that  when  nearer  a 
corner  than  4  inches  this  covering  shall  be  increased  to  2  inches.  Splices  in  reinforcing 
bars  shall  be  made  as  described  in  Article  307  (4c). 


302 Masonry 

(b)  Lateral  Ties. — Lateral  ties  should  be  at  least  %  inch  in  diameter  and  should  be 
spaced  apart  not  over  16  bar  diameters,  48  tie  diameters,  or  the  least  dimension  of  the 
column.  When  there  are  more  than  four  vertical  bars,  additional  ties  should  be  provided 
so  that  every  longitudinal  bar  is  held  firmly  in  its  designed  position. 

(c)  Limits  of  Column  Section. — In  a  tied  column  which  for  architectural  reasons 
has  a  larger  cross  section  than  required  by  considerations  of  loading,  a  reduced  effective 
area  Ag  not  less  than  one-half  of  the  total  area  may  be  used  in  applying  the  provisions 
of  Article  307  (5a),  but  the  longitudinal  reinforcement  should  be  distributed  over  the 
full  column  section. 

6.  Composite  Columns 

(a)  Allowable  Load. — The  allowable  load  on  a  composite  column  consisting  of  a 
structural  steel  or  cast  iron  column  thoroughly  encased  in  concrete  reinforced  with  both 
longitudinal  and  spiral  reinforcement,  should  not  exceed  that  given  by  Formula  (38). 

P  =  0.22SAcf'c  +  fsAs  +  Mr   (38) 

Wherein  Ac=  net  area  of  concrete  section  Ag  —  As  —  At. 

Aa=  cross-sectional  area  of  longitudinal  bar  reinforcement. 
At=  cross-sectional  area  of  the  steel  or  cast  iron  core. 

/r  =  allowable  unit  stress  in  metal  core,  not  to  exceed  16,000  pounds  per  square 
inch  for  a  steel  core;  or  10,000  pounds  per  square  inch  for  a  cast  iron  core. 

The  remaining  notation  is  that  of  Article  307  (4). 

(b)  Details  of  Metal  Core  and  Reinforcement. — The  cross-sectional  area  of  the  metal 
core  should  not  exceed  20  percent  of  the  gross  area  of  the  column.  If  a  hollow  metal 
core  is  used  it  should  be  filled  with  concrete.  The  amounts  of  longitudinal  and  spiral 
reinforcement  and  the  requirements  as  to  spacing  of  bars,  details  of  spUces,  and  thick- 
ness of  protective  shell  outside  the  spiral  should  conform  to  the  limiting  values  specified 
in  Article  307  (4b,  c  and  d).  A  clearance  of  at  least  3  inches  should  be  maintained 
between  the  spiral  and  the  metal  core  at  all  points  except  that  when  the  core  consists 
of  a  structural  steel  H-column,  the  minimum  clearance  may  be  reduced  to  2  inches. 

(c)  Splices  and  Connections. — Metal  cores  in  composite  columns  shall  be  accurately 
milled  at  sphces  and  positive  provision  shall  be  made  for  the  alinement  of  one  core 
above  another.  Transfer  of  loads  to  the  metal  core  should  be  provided  for  by  use  of 
bearing  members  such  as  billets,  brackets,  or  other  positive  connections;  these  should  be 
provided  at  the  top  of  the  metal  core  and  at  intermediate  floor  levels  where  required. 
Ample  section  of  concrete  and  continuity  of  reinforcement  should  be  provided  at  the 
junction  with  beams  and  girders.  The  column  as  a  whole  should  satisfy  the  requirements 
of  Formula  (38)  at  every  section;  in  addition  to  this,  the  reinforced  concrete  portion 
should  be  designed  to  carry,  in  accordance  with  Formula  (36),  all  floor  loads  brought 
onto  the  column  at  levels  between  the  metal  brackets  or  connections.  In  applying  For- 
mula (36)  to  a  hollow  core  filled  with  concrete,  the  area  of  the  concrete  within  the  core 
should  not  be  included  in  the  area  defined  as  Ag.  At  the  column  base,  provision  should 
be  made  to  transfer  the  load  to  the  footing  at  safe  unit  stresses  in  accordance  with 
Article  308  (8).  The  base  of  the  metal  core  should  be  designed  to  transfer  the  load 
from  the  entire  composite  column  to  the  footing,  or  it  may  be  designed  to  transfer  the 
load  from  the  metal  section  only,  provided  it  is  so  placed  in  the  pier  or  pedestal  as  to 
leave  ample  section  of  concrete  above  the  base  for  the  transfer  of  load  from  the  reinforced 
concrete  section  of  the  column  by  means  of  bond  on  the  vertical  reinforcement  and  by 
direct  compression  on  the  concrete. 

(d)  Allowable  Load  on  Bare  Metal  Core.— The  metal  cores  of  composite  columns 
should  be  designed  to  carry  safely  any  construction  or  other  loads  to  be  placed  upon  them 
prior  to  their  encasement  in  concrete. 


Masonry 303 

7.  Combination  and  Pipe  Columns 

(a)  Conibinatioti  Columns;  Steel  Columns  Encased  in  Concrete. — The  allowable 
load  on  a  structural  steel  column  which  is  encased  in  concrete  at  least  2^  inches  thick 
over  all  metal  (except  rivet  heads)  reinforced  as  hereinafter  required,  should  be  computed 
by  Formula  (39a). 

P  =  Arf'r  r  1  +  -^1 (39a) 

L  100/1  rj 

Wherein  ^r  =  cross-sectional  area  of  steel  column. 

f'r  =  allowable  stress  for  unencased  steel  column. 
Ac  =  total  area  of  concrete  section,  =  Ao  — Ar. 

The  concrete  used  should  develop  a  compressive  strength,  /'c,  of  at  least  2,500  pounds  per 
square  inch  when  tested  according  to  the  provisions  of  Article  202  (7).  The  concrete 
should  be  reinforced  by  welded  wire  mesh  having  wire  not  smaller  than  No.  10  gage, 
spaced  in  vertical  direction  not  more  than  4  inches,  and  in  the  horizontal  direction  not 
more  than  8  inches.  This  mesh  should  extend  entirely  around  the  column  at  a  distance 
of  1  inch  inside  the  outer  concrete  surface  and  should  be  lap-spliced  at  least  40  wire 
diameters  and  wired  at  the  splice. 

Special  brackets  should  be  used  to  receive  the  entire  floor  load  at  each  floor  level. 
The  steel  column  should  be  designed  to  carry  safely  any  construction  or  other  loads  to  be 
placed  upon  it  prior  to  its  encasement  in  concrete. 

(b)  Pipe  Columns. — The  allowable  load  on  columns  consisting  of  steel  pipe  filled 
with  concrete  should  not  exceed  that  given  by  Formula  (39b). 

P  =  0.22S/'c4p  +  f'rAc  (39b) 

The  value  of  /'r  should  be  that  given  by  Formula  (39c) 

f'r  =  r  18,000  —  70-^1  F (39c) 

Wherein  /'r  :=  allowable  stress  in  the  steel  pipe  section. 
h  =  unsupported  length  of  column. 
R  =  radius  of  gyration  of  steel  pipe  section. 
p,  tensile  yield  point  of  pipe  material 

~~  45,000 

If  the  yield  point  is  not  known,  the  factor  F  shall  be  taken  as  0.5. 
If  the  concrete  strength  /'c  is  not  known  it  shall  be  assumed  at  2,500  pounds  per 
square  inch. 

8,  Long  Columns 

(a)  The  maximum  allowable  load  P'  on  axially  loaded  reinforced  concrete  or  com- 
posite columns  having  a  length,  h,  greater  than  10  times  the  least  lateral  dimension,  d, 
is  given  by  Formula  (39d). 

/>'  =  P  r  1 .3  _  .03  Al (39d ) 

Wherein   P  =  the  allowable  axial  load  on  a  short  column  as  given  by  Formulas   (36) 
and  (38). 

(b)  The  maximum  allowable  load  F  on  eccentrically  loaded  columns  in  which 
h  -=r  d  exceeds  10  is  also  given  by  Formula  (39d)  in  which  P  is  the  allowable  eccen- 
trically applied  load  on  a  short  column  as  determined  by  the  provisions  of  Articles  307 
(10)  and  (11).  In  long  columns  subjected  to  definite  bending  stresses,  as  determined  in 
Article  307  (9),  the  ratio  h  ^  d  should  not  exceed  20. 


304 Masonry 

9.  Bending  Moments  in  Columns 

The  bending  moments  in  the  columns  of  all  reinforced  concrete  structures  should  be 
determined  on  the  basis  of  loading  conditions  and  restraint  and  should  be  provided  for 
in  the  design.  When  the  stiffness  and  strength  of  the  columns  are  utilized  to  reduce 
moments  in  beams,  girders,  or  slabs,  as  in  the  case  of  rigid  frames  in  general,  the  need 
for  recognizing  column  moments  is  obvious;  in  other  forms  of  continuous  construction 
where  column  moments  are  unavoidable,  they  should  also  be  provided  for  in  the  design. 
In  building  frames,  particular  attention  should  be  given  to  cases  of  unbalanced  floor 
loads  on  both  exterior  and  interior  columns  and  of  eccentric  loading  due  to  other  causes. 
Wall  columns  should  be  designed  to  resist  moments  produced  by:  (a)  Loads  on  all 
floors  of  the  building,  (b)  loads  on  a  single  exterior  bay  at  two  adjacent  floor  levels,  or 
(c)  loads  on  a  single  exterior  bay  at  one  floor  level.  Resistance  to  bending  moments  at 
any  floor  level  should  be  provided  by  distributing  the  moment  between  the  columns 
immediately  above  and  below  the  given  floor  in  proportion  to  their  relative  stiffnesses 
and  conditions  of  restraint. 

10.  Combined  Axial  and  Bending  Stress 

(a)  In  reinforced  concrete  columns  subjected  to  bending  moments,  the  recognized 
methods  of  analysis  should  be  followed  in  calculating  the  stresses  due  to  combined  axial 
load  and  bending.  The  maximum  fiber  stress  in  compression  and  (in  the  case  of  large 
eccentricities  of  loading)  the  tensile  stress  in  the  vertical  bars  will  govern  the  design. 
The  gross  area  of  both  spiral  and  tied  columns  should  be  used  in  the  computations. 

(b)  For  preliminary  designs  it  will  usually  give  satisfactory  results  to  compute  the 
combined  fiber  stress  in  compression  on  the  basis  of  an  uncracked  section  of  the  column 
using  Formula  (39e).t 

y  _f        L^+"fJ      (39e) 

A^    1+  {n—l)p. 
Wherein   e  =  eccentricity  of  resultant  load,  measured  from  the  gravity  axis, 
c  =  distance  from  gravity  axis  to  extreme  fiber  in  compression. 
R  =■  radius  of  gyration  of  equivalent  concrete  section. 
M  =:  as  given  in  Article  301  (4). 

Other  terms  as  in  Article  307  (4). 

The  term  — ;;-  may  be  replaced  by  the  value  i>e  -h-  t  for  rectangular  columns  and 
R" 
Se  -^  t  for  round  columns  without  appreciable  error  {t  ■=  overall  depth  of  section).  This 

design  may  then  be  analyzed  by  more  accurate  methods  to  insure  that  allowable  stresses 

are  not  exceeded. 

11.  Allowable  Combined  Axial  and  Bending  Stresses 

(a)  For  spiral  and  tied  columns,  eccentrically  loaded  or  otherwise  subjected  to 
combined  axial  compression  and  flexural  stress,  the  maximum  allowable  compressive  fiber 
stress,  /c,  is  given  by  Formula  (39f). 

1  +  ^ 
f  ^     f    ^1_ (39f ) 

1  +  C^ 


t  This  will  result  in  a  fairly  accurate  design  if  the  eccentricity  is  less  than   J^    the  overall  column 
width,  and  the  value  of  p  n  is  0.3  or  more. 


Masonry 305 

Wherein  the  notation  is  that  of  Articles  307   (4)   and  (10),  and  in  addition,  /a  is  the 
average  allowable  stress  on  an  equivalent  axially  loaded  concrete  column,  and  C  is  the 

ratio  of  /»  to  the  allowable  fiber  stress  for  members  in  flexure.  Thus,  /» —  -^ "  '  ■'"^^ 

l+{n  —  l)p, 
for  spiral  columns,  and  0.8  of  this  value  for  tied  columns. 

r J* 


OASf'c 

(b)  The  allowable  tensile  stress  in  the  longitudinal  reinforcement  may  equal  that 
specified  for  flexural  members,  provided  however  that  splices  in  the  tensile  steel  at  or 
near  the  section  of  maximum  column  moment  are  capable  of  developing  fully  the  yield 
point  strength  of  the  reinforcement. 

12.  Wind  or  Earthquake  Stresses 

When  columns  are  subject  to  wind  or  earthquake  stresses  in  addition  to  combined 
axial  load  and  bending,  the  column  section  need  not  be  increased  unless  the  allowable 
stress  given  by  Formula  (39f)  is  exceeded  by  more  than  one-third. 


Report  on  Assignment  3 

Progress  in  Science  and  Art  of  Concrete  Manufacture 

Needed  Adjustments  in  Field  Practice  To  Use   Present   Day  Cements 

to  Best  Advantage 

C.  P.  Marsh   (chairman,  subcommittee),  F.  W.  Capp,  R.  Hayes,  L.  M.  Morris,  W.  M. 
Ray,  G.  E.  Shaw,  C.  H.  Splitstone,  L.  W.  Walter,  C.  A.  Whipple. 

In  considering  this  subject  the  subcommittee  has  limited  its  studies  and  this  report 
to  the  types  of  Portland  cement  for  which  ASTM  specifications  have  been  published, 
and  has  assumed  that  study  and  report  on  the  use  of  calcium-aluminate  cement,  masonry 
cements  and  blended  cements  were  matters  outside  of  its  assignment. 

The  new  ASTM  specifications  which  bear  the  title  Tentative  Specifications  for  Port- 
land Cement,  ASTM  Serial  Designation  (C-1SO-40T)  cover  five  types  of  cement  which 
are  intended  to  embrace  all  of  the  engineering  uses  of  Portland  cement.  While  these 
specifications  are  only  tentative  and  do  not  supersede  current  standards  for  Portland  and 
high  early  strength  Portland  cements  (C9-38  and  C74-39,  respectively),  it  is  anticipated 
that  some  engineers  may  wish  to  take  advantage  of  the  wider  range  in  types  which  they 
afford.  The  following  comments  are  offered  as  an  aid  in  selecting  the  type  of  cement 
which  is  best  adapted  to  a  particular  structure  or  group  of  structures. 

Type  I. — This  cement,  except  for  some  differences  in  requirements  and  the  incorpora- 
tion of  the  autoclave  test  for  soundness,  is  the  same  as  those  called  for  by  the  current 
ASTM  standard  specification  C9-38  and  by  the  federal  specification  SS-C-191a. 

This  type  of  cement  is  adapted  for  general  concrete  construction  where  the  special 
properties  specified  for  types  II,  III,  IV  and  V,  are  not  required.  Owing  to  the  fact  that 
this  cement  is  more  finely  ground  and  in  general  has  a  higher  lime  content  than  the 
normal  Portland  cement  of  some  12  to  IS  years  ago,  it  develops  strength  and  heat  of 
hydration  more  rapidly  and  the  total  heat  of  hydration  in  any  period  is  greater.  These 
changes  cause  heat  to  be  generated  more  rapidly  and  produce  higher  temperatures  in  the 
concrete.  Due  to  the  higher  temperature,  larger  temperature  differentials  within  the  mass 


306 Masonry 

and  a  greater  loss  of  moisture  are  encouraged,  which  in  turn  aggravate  the  tendency  to 
crack.  Consequently,  what  was  considered  good  practice  in  placing  concrete  12  or  15  years 
ago  must  be  revised  in  respect  to  limiting  the  temperature  of  the  concrete  when  placed 
and  the  rate  of  placing,  and  in  providing  ample  moisture  for  curing  during  the  first  few 
days  after  placing.  Because  the  strength  develops  more  rapidly  the  curing  period  may  be 
shortened  somewhat  from  the  seven  days  usually  specified.  If  an  ample  supply  of  mois- 
ture is  assured  a  Hmit  of  five  days  is  recommended. 

Type  II. — This  cement  is  adapted  for  use  in  general  construction  where  the  special 
properties  specified  for  types  III,  IV  and  V,  are  not  required,  and  when  the  chemical 
and  physical  test  requirements  prescribed  for  this  type  are  desired.  In  rate  of  hardening, 
this  cement  is  intermediate  between  that  of  Type  I  and  the  low  heat  cement  of  Type  IV, 
and  is  similar  to  the  cement  used  by  the  Tennessee  Valley  Authority  in  dam  construction. 

It  is  recommended  particularly  for  structures  of  considerable  size  where  low  heat 
cement  is  not  necessary  but  where  the  use  of  cement  of  moderate  heat  of  hardening  will 
tend  to  minimize  temperature  rise  and  the  resulting  tendency  to  shrinkage  cracking,  as 
in  the  case  of  large  piers,  heavy  abutments,  heavy  retaining  walls,  etc.,  when  such  struc- 
tures are  placed  in  warm  weather.  In  cold  weather,  when  the  heat  generated  during 
hardening  is  of  advantage.  Type  I  cement  may  be  preferable. 

Type  II  cement,  because  of  greater  sulphate  resistance  as  compared  with  Type  I,  is 
recommended  for  places  where  added  precaution  against  sulphate  attack  is  a  factor  of 
importance,  such  as  in  mine  and  drainage  structures  where  the  sulphate  concentrations 
are  not  unusually  severe.  Where  the  sulphate  concentrations  are  severe,  Type  V  cement 
is  recommended,  as  noted  below. 

Type  II  cement  is  suitable  for  concrete  roads  and  architectural  concrete  structures. 
It  can  be  used  equally  as  well  as  Type  I  for  many  other  structures  for  which  no 
preference  as  between  the  two  types  is  justified.  It  is  recommended  that  the  curing 
period  when  using  Type  II  cement,  be  not  less  than  seven  days  when  an  ample  supply 
of  moisture  is  assured. 

Type  III. — This  is  a  high  early  strength  cement.  The  requirements  for  this  type  are 
in  most  respects  the  same  as  those  in  the  present  ASTM  Specifications  for  High  Early 
Strength  Portland  Cement,  C74-39,  and  in  even  closer  agreement  with  those  in  the 
Federal  Specifications  for  High  Early  Strength  Portland  Cement,  SS-C-201.  This  type  is 
recommended  where  high  strength  concrete  at  early  periods  is  desired,  which  can  be 
obtained  more  satisfactorily  or  more  economically  by  the  use  of  a  high  early  strength 
cement  than  by  resorting  to  richer  mixes. 

Owing  to  the  quicker  hardening,  the  heat  due  to  hydration  develops  rapidly  in  the 
early  period.  The  total  heat  evolved  is  also  greater,  and  because  of  this  greater  care 
must  be  taken  to  avoid  temperature  cracks.  Where  Type  III  cement  is  used  the  curing 
period  should  be  not  less  than  three  days. 

Type  IV. — This  is  a  low  heat  cement  which  has  not  been  covered  previously  by 
ASTM  Specifications,  although  cement  of  this  type  has  been  used  by  the  Bureau  of 
Reclamation  and  other  government  bodies  under  specifications  having  similar  require- 
ments. Type  IV  cement  is  a  slow  hardening  cement  which  should  not  be  used  for  gen- 
eral work.  It  is  recommended  for  use  only  in  extremely  large  masses  of  concrete  where 
the  temperature  rise  resulting  from  the  heat  generated  during  hardening  is  a  critical 
factor.  Because  of  the  special  characteristics  of  this  cement,  it  will  not  be  generally 
available. 

It  is  doubtful  that  its  use  would  be  found  necessary  in  railroad  construction.  As  it 
gains  strength  slowly,  the  curing  period  should  be  prolonged  to  four  weeks. 


Masonry 307 

Type  V. — This  is  a  special  cement  intended  to  provide  a  very  high  degree  of  sul- 
phate resistance.  Like  Type  IV  this  cement  will  not  be  generally  available,  and  because 
of  its  slow  hardening  characteristics,  should  never  be  considered  for  any  but  the  special 
purpose  for  which  it  is  intended. 

Its  use  is  recommended  only  in  structures  exposed  to  severe  sulphate  action,  such 
as  is  encountered  in  some  of  the  western  states  having  soils  or  waters  of  high  alkali 
content.  The  slow  hardening  of  this  cement  requires  a  longer  period  of  moist  curing  at 
normal  temperatures. 


Report  on  Assignment  6 

Methods  and  Practices  of  Lining  and  Relining  Tunnels 
Collaborating  With  Committee  1 — Roadway  and  Ballast 

I.  L.  Pyle  (chairman,  subcommittee),  G.  E.  Boyd,  Maurice  Coburn,  G.  F.  Eberly,  W.  A. 
Kingman,  Roscoe  Owen,  O.  V.  Parsons,  G.  R.  Smiley. 

The  following  specifications  are  submitted  as  information  with  the  object  of  pre- 
senting them  later  for  adoption  and  publication  in  the  Manual. 

SPECIFICATIONS   FOR  LINING  RAILWAY  TUNNELS  WITH 
METAL  LINER  PLATES   AND   SHOTCRETE 

I  GENERAL 

101,  Scope 

These  specifications  cover  the  Hning  of  new  tunnels  and  the  relining  of  old  tunnels 
through  ordinary  formations  which  involve  no   special   features. 

102.  Metal  Lining 

The  side  walls  shall  consist  of  metal  Uner  plates,  not  less  than  %  inch  in  thickness, 
secured  between  I-beams  used  as  columns  for  supporting  wall  plates  and  arches. 

The  arch  shall  consist  of  liner  plates  alone  or,  when  necessary,  supplemented  with 
ribs  of  I-beams,  T-shapes  or  flat  bars,  supported  on  H-beams  of  the  required  size  used 
as  a  wall  plate. 

II  DESIGN 

201.  Interior  Dimensions 

The  interior  dimensions  of  the  clear  space  provided  for  single  and  double  track 
tunnels  shall  not  at  any  point  be  less  than  the  tunnel  clearance  recommended  by  the 
AREA,  pages  Cl-4  and  Cl-5  of  the  Manual. 

202.  Floor  and  Ballast  Walls 

In  all  new  tunnels,  a  concrete  floor  and  ballast  walls  for  ballast  track  section,  or  a 
floor  for  solid  track  section,  shall  be  installed  in  accordance  with  AREA  Specifications 
for  Lining  Railway  Tunnels  with  Plain  Concrete,  page  &-103  of  the  Manual. 

203.  Foundations  for  Side  Walls 

A  concrete  footing  shall  be  provided  for  the  side  walls.  The  concrete  shall  be  made 
and  placed  in  accordance  with  the  AREA  Specifications  for  Portland  Cement  Concrete, 
Plain  and  Reinforced. 


308 Masonry 

The  bottom  of  the  concrete  footing,  in  hard,  durable  material,  shall  be  at  least 
6  inches  below  the  bottom  of  the  gutter  for  ballast  track  sections  and  6  inches  below 
the  intersection  of  the  surface  of  the  floor  and  the  side  walls  for  solid  track  sections. 
In  other  material,  it  shall  be  carried  to  suitable  foundation. 

204.  Side  Wall  and  Arches 

Side  walls  and  arches  shall  consist  of  metal  liner  plates,  properly  supported  and  a 
protective  covering  of  shotcrete  not  less  than  3  inches  thick,  measured  from  the  inside 
face  of  the  liner  plate. 

The  space  between  the  liner  plates  and  the  face  of  the  excavation  shall  be  (a)  firmly 
packed  with  durable  stone,  rammed  into  place  and  the  voids  filled  with  grout,  or  (b)  en- 
tirely filled  with  "pea  gravel"  placed  pneumatically  and  the  voids  filled  with  grout. 

205.  Refuge  Niches 

Refuge  niches  shall  be  at  least  IS  inches  deep,  3  feet  6  inches  wide  and  7  feet  high. 
Niches  should  be  spaced  approximately  100  feet  apart  and  staggered  with  the  opposite 
side  so  that  there  will  be  a  niche  every  SO  feet  in  the  tunnel.  The  bottom  of  niches  shall 
be  at  the  elevation  of  base  of  rail  for  ballast  track  sections  and  at  the  intersection  of  the 
surface  of  the  floor  and  the  side  walls  for  solid  track  sections. 

206.  Drainage  Openings 

Rectangular  tile  drains,  3%  inches  by  S  inches,  shall  be  installed  as  necessary  in  the 
rear  of  the  fining,  with  outlets  through  the  side  walls  to  provide  adequate  drainage. 

Weep  holes  shall  be  placed  through  the  side  walls  at  intervals  of  20  feet  unless 
drainage  conditions  require  them  to  be  placed  at  shorter  intervals.  The  weep  holes 
should  be  of  pipe  not  less  than  4  inches  in  diameter  and  placed  on  a  slope  of  4S  degrees. 
The  outer  end  of  the  outlets  or  weep  holes  shall  be  not  less  than  12  inches  above  the 
bottom  of  the  gutter.  Sub-drains  shall  be  provided  under  the  floor  as  necessary.  Round 
tile  drains  4  inches  in  diameter,  or  openings  of  similar  area,  shall  be  installed  in  each 
10  feet  of  ballast  walls  to  provide  drainage  for  the  section  of  the  floor  between  the  ballast 
walls. 

Ill  SHOTCRETE 

301.  Specifications 

The  shotcrete  for  the  lining  shall  be  made  and  placed  in  accordance  with  the  AREA 
Specifications  for  Shotcrete,  page  8-95  of  the  Manual,  together  with  the  additional 
provisions  given  herewith. 

302.  Cement 

Portland  cement  shall  conform  to  the  requirements  of  the  AREA  Specifications  for 
Portland  Cement,  page  8-9  of  the  Manual. 

303.  Aggregate 

Aggregate  shall  consist  of  fine  granular  material  composed  of  hard,  strong,  durable 
mineral  particles  that  are  free  from  injurious  amount  of  saline,  alkaline,  organic  or  other 
deleterious  substances. 

Aggregate  shall  be  well  graded.  The  particles  shall  range  in  size  within  the  hmits 
below,  percentage  by  weight  and  shall  have  a  fineness  modulus  which  shall  be  between 
2.2S  and  2. 75: 


Masonry 309 

Percent 
Sieve  Size  Retained 

No.      4  0 

No.      8  5-30 

No.     16  15^0 

No.     30  35-55 

No.     50  65-85 

No.  100  92^98 

304.  Steel  Reinforcement 

Shotcrete  shall  be  reinforced  by  galvanized  electric  welded  wire  fabric  3X3  inch 
mesh  No.  10  A.S.W.G.  Sheets  shall  be  securely  and  properly  fastened  together  and  wires 
stretched  tight. 

305.  Curing 

The  shotcrete  lining  shall  be  kept  wet  for  at  least  7  days  after  placing. 

Revision  of  the  Manual 

Your  committee  recommends  changes  in  the  Specifications  for  Lining  Railway  Tun- 
nels with  Plain  Concrete,  adopted  in  1936  and  appearing  on  page  8-103,  for  the  purpose 
of  including  an  alternate  for  solid  floor  track  section,  with  center  drain,  along  with  the 
present  standard  for  ballast  section. 

Change  the  title  of  Section  202  from  its  present  form  to: 

202.  Floor  and  Ballast  Walls  for  Ballast  Track  Section 
Add  the  following  new  section: 

203.  Floor  for  Solid  Track  Section 

The  track  rails  shall  be  supported  on  creosoted  tie  blocks  8  inches  by  10  inches  by 
2  feet  6  inches,  spaced  19^  inches  on  center,  embedded  in  the  concrete  floor,  with  a 
double-shoulder  tie  plate  fastened  to  the  tie  block  with  suitable  lag  screws.  Superelevation 
shall  be  provided  for  curve  track  by  increasing  the  thickness  of  the  tie  blocks  under  the 
high  rail. 

The  concrete  floor  shall  extend  at  least  1  foot  4  inches  below  the  bottom  of  the  tie 
blocks.  The  surface  of  the  floor  shall  slope  }i  inch  in  12  inches  from  the  center  of  the 
drain,  7iJ  inches  below  the  top  of  the  tie  block  for  double  track  and  4  inches  below 
the  top  of  tie  block  for  single  track,  up  to  the  side  walls.  (See  supplement  to  Figures  835 
and  836.) 

Make  the  necessary  changes  in  the  remaining  section  numbers. 

Change  the  first  paragraph  in  present  Section  203  (new  No.  204)  to  read  as  follows: 

The  depth  of  the  side  walls,  in  hard,  durable  material,  shall  be  at  least  6  inches  below 
the  bottom  of  the  gutter  for  ballast  track  section  and  at  least  6  inches  below  the  inter- 
section of  the  floor  surface  with  the  side  walls  for  solid  track  section.  In  other  material, 
the  side  walls  shall  be  carried  down  to  stable  foundation  and  at  least  to  below  the 
frost  line. 

Change  the  last  sentence  of  the  first  paragraph  of  present  Section  205  (new  No.  206) 
to  read  as  follows: 

The  bottom  of  the  niches  shall  be  at  the  elevation  of  the  bottom  of  the  track  ties  for 
the  ballast  track  section  and  at  the  elevation  of  the  intersection  of  the  floor  surface 
with  the  side  walls  for  the  solid  track  section.  (Figures  835,  836  and  supplement.) 


310 


Masonry 


Super- Elevafion  to  be  provided 
bY  increasing  thickness  of  tie 
block  under  high  rail  on  curves. 

Necessary  drains  and 
catch  basins  to  be  provided 
at  ends  of  tunnels. 

Tic  blocks  to  be  creosoted.and 
prebored  for  spikes  and  log  screws. 


•i* 


^A 


Section 
Single  Tpack  ,5olid  Floor.. 


.  .     1      . 


[«-t-6"-«j-  f-6"->j«  Z'-b^l'-9 

a" 


3    C 
C   I; 

1-0 


.  8x  lo'"  1"-  fe"  Tie  Blocks- 19'/1  cc. 
Double  5hoolder  tie  plate  with 
Z-Log  Screws  -  2.  Cut  Spikes 


Section 
Double:  Track    5olid  Floovz.. 

Supplement  to  Figures  835  and  836. 


^1 


Report  on  Assignment  8 
Progress  in  Cement  Manufacture  and  Testing 

C.  P.  Marsh   (chairman,  subcommittee),  F.  W.  Capp,  Maurice  Coburn,  L.  M.  Morris, 
L.  W.  Walter. 

Supplementing  the  report  presented  last  year,  the  committee  reports  as  follows: 
At  the  June,  1940,  meeting  of  the  American  Society  for  Testing  Materials,  that 
society  adopted  "Tentative  Specifications  for  Portland  Cement,  (C1S0-40T)",  which  are 
in  effect  a  tentative  revision  of,  and  are  intended  to  replace,  when  adopted,  the  present 
Standard  Specifications  for  Portland  Cement  (C9-38),  and  for  High  Early  Strength 
Portland  Cement  (C74-39). 

These  new  specifications  of  the  ASTM  provide  for  five  types  of  Portland  cement, 
as  follows: 

Type  I. — For  use  in  general  concrete  construction  when  the  special  properties 
specified  for  types  II,  III,  IV  and  V  are  not  required. 

Type  II. — This  cement  is  adapted  for  use  in  general  concrete  construction 
when  the  special  properties  specified  for  types  III,  IV,  and  V  are  not  required, 
and  when  the  chemical  and  physical  test  requirements  prescribed  for  this  type  are 
desired. 


Masonry    3n_ 

Type  III. — For  use  when  high  early  strength  is  required. 

Type  IV. — For  use  when  a  low  heat  of  hydration  is  required  (Note). 

Type  V. — For  use  when  high  sulphate  resistance  is  required  (Note). 


Note — Attention  is  called  to  the  fact  that  cements  conforming  to  the  requirements  for 
type  IV  and  type  V  are  not  usually  carried  in  stock.  In  advance  of  specifying  their  use  pur- 
chasers or  their  representatives  should  determine  whether  these  types  of  cement  are,  or  can  be, 
made  available. 

The  specifications  for  these  five  types  of  cement  correspond  closely  with  the  five 
federal  specifications  given  in  the  table  accompanying  the  committee's  report  of  last  year 
as  printed  in  the  Proceedings  for  1940,  Vol.  41,  page  383. 
They  are  related  as  follows: 

Type      I — Federal,  Portland 

Type    II — Federal,  moderate  heat  of  hardening  Portland 

Type  III — Federal,  high  early  strength  Portland 

Type  IV — Boulder  dam  low  heat  Portland 

Type    V — Federal,  sulphate  resisting  Portland 

The  chemical  and  physical  requirements  are  shown  in  tables  I  and  II. 

It  will  be  noted  that  the  table  of  physical  requirements  includes  an  autoclave  sound- 
ness test.  At  its  June,  1940,  meeting,  the  American  Society  for  Testing  Materials  adopted 
as  tentative  a  Method  of  Test  for  Autoclave  Expansion  of  Portland  Cement  (ClSl^OT). 

While  the  present  ASTM  Standard  Specifications  for  Portland  Cement  contain  no 
requirement  for  fineness,  the  new  tentative  specifications  contain  a  requirement  for  fine- 
ness as  determined  by  the  turbidimeter  for  types  I,  II,  IV  and  V  cements.  The  society 
adopted  tentative  methods  for  this  test  in  1939  under  the  serial  designation  C11S-38T. 

During  the  past  year,  investigations  by  7  laboratories  of  mortars  for  the  plastic 
mortar  cube  test  for  compressive  strength  and  studies  by  30  laboratories  of  various 
types  of  test  for  volume  change  and  soundness,  have  been  carried  on  under  the  spon- 
sorship of  working  committees  of  ASTM  Committee  Cl  on  Cement.  The  working  com- 
mittee on  the  plastic  mortar  tests  reported  that  none  of  the  mortars  covered  by  the 
investigation  showed  sufficient  superiority  over  that  specified  in  the  Tentative  Method  of 
Test  for  Compressive  Strength  of  Portland  Cement  Mortars  (C109-37T)  to  warrant  a 
change  in  type  of  mortar  and  recommended  that  this  specification  be  retained  as  tenta- 
tive for  another  year  in  order  that  the  committee  might  study  suggestions  for  improve- 
ment resulting  from  a  study  of  the  effect  of  different  types,  capacities,  etc.,  of  testing 
machines,  and  in  order  to  investigate  the  high  frequency  vibration  method  for  moulding 
cubes  suggested  by  the  National  Bureau  of  Standards.  The  working  committee  on  volume 
change  and  soundness  reported: 

1.  That  for  206  (94  percent)  of  221  cements  tested,  the  autoclave  expansion 
of  neat  bars  at  14  days  was  either  approximately  the  same  or  was  less  than  the 
expansion  of  companion  bars  at  1  day. 

2.  That  the  method  used  in  moulding  the  1  X  1  X  llJ4-in-  neat  bars  did  not 
affect  the  1-day  autoclave  expansion  appreciably. 

3.  That  sound  autoclave  pats  may  be  obtained  with  cements  which  show 
autoclave  expansions  up  to  4  or  5  percent. 

4.  That  pats  in  the  ASTM  steam  test  were  reported  as  sound  for  nearly  all 
of  the  cements  except  those  having  excessively  high  autoclave  expansions  at  1  day. 
(The  committee  commented  that  "the  results  confirm  those  of  many  other  tests 
in  showing  the  inadequacy  of  the  standard  pat  test  as  a  test  for  soundness  of 
cement".) 


312  Masonry 

Chemical  and  Physical  Requirements  of  Proposed  Tentative  Speclfications  fok 

Portland  Cement — 1940 
Chemical  Limits: 

Portland  Cement  of  each  of  the  five  types  shown  in  Section  1  shall  conform  to  the  requirements  prescribed 
in  Table  I. 

Table  I- — Chemical  Requirements 

Ty^e  I        Type  11      Type  III     Type  IV*      Type  V* 

Magnesium  oxide  (MgO)  Max.,  percent 5.0  5.0  5.0  5.0  4.0 

Sulfur  trioxide  (SO3)  max.,  percent 2.0  2.0  2.5  2.0  2.0 

Loss  on  ignition,  max.,  percent 3.0  3.0  3.0  2.3  3.0 

Insoluble  residue,  max.,  percent 0.75  0.75  0.75  0.75  0.75 

Silica  (Si02)  min.,  percent 21.0  24.0 

Alumina  (AI2O3)  max.,  percent 6.0  4.0 

Iron  Oxide  (FeaOa)  max.,  percent 6.0  6.5  4.0 

Ratio  of  AI2O3  to  FejOs 0.7  to  2.0  0.7  to  2.0 

Tricalcium  silicate  (3  CaO.Si02)t  max.,  percent--       50  35  

Dicalcium  silicate  (2  CaO.  Si02)t  min.,  percent  -  _       40  

Tricalcium  aluminate  (3  CaO.  A]203)t  max. percent       8  15  7  5 

*  See  Note,  Section  1. 

t  The  expressing  of  chemical  limitations  by  means  of  calculated  assumed  compounds  does  not  necessarily 
raiean  that  the  oxides  are  actually  or  entirely  present  as  such  compounds. 

The  percentages  of  tricalcium  silicate,  dicalcium  silicate,  and  tricalcium  aluminate  shall  be  calculated 
from  the  chemical  analysis  as  follows: 
Tricalcium  silicate= 

(4.07  X  percent  CaO)— (7.60  x  percent  Si02) 

—(6.72  X  percent  AI2O3)— (1.43  x  percent  Fe203)— (2.85  x  percent  SO3) 
Dicalcium  silicate= 

(2.87  X  per  cent  Si02)— (0.754  x  percent  3  CaO.  Si02) 
Tricalcium  aluminate= 

(2.65  X  percent  AI2O3)— (1.69  x  percent  Fe203) 

Oxide  determinations  calculated  to  the  nearest  0.1  percent  shall  be  used  in  the  calculations.  Compound 
percentages  shall  be  calculated  to  the  nearest  0.1  percent  and  reported  to  the  nearest  1  percent. 
Physical  Requirements: 

Portland  Cement  of  each  of  the  five  types  shown  in  Section  1  shall  conform  to  the  requirements  prescribed 
in  Table  II. 

Table  II — Physical  Requirements 

Type  I        Type  II      Type  III       Type  IV*     Type  V* 
Fineness,  specific  surface  sq.  cm.  per  g.: 

Average  value,  min 1,600  1,700         1,800  1,800 

Minimum  value,  any  one  sample 1,500  1,600         1,700  1,700 

Soundness: 

Autoclave  expansion,  max.,  percent 0.50  0.50  0.50  0.50  0.50 

Time  of  setting  (alternate  methods)** 
Gillmore  test: 

Initial  set,  min.,  not  less  than 60  60  60  60  60 

Final  set,  hr.,  not  more  than 10  10  10  10  10 

Vicat  test: 

Initial  set,  min.,  not  less  than 45  45  45  45  45 

Final  set,  hr.,  not  more  than 10  10  10  10  10 

Tensile  strength,  psi.;t 

The  average  tensile  strength  of  not  less  than 
three  standard  mortar  briquets  composed  of  1 
part  cement  and  3  parts  standard  sand,  by 
weight,  shall  be  equal  to  or  higher  than  the 
values  specified  for  the  ages  indicated  below: 

1  day  in  moist  air 275  

1  day  in  moist  air,  2  days  in  water 150  125  375         

1  day  in  moist  air,  6  days  in  water 275  250  - 175  175 

1  day  in  moist  air,  27  days  in  water 350  325  t  300  300 

Compressive  strength,  psi.:t 

The  average  compressive  strength  of  not  less 
than  three  mortar  cubes  composed  of  1  part 
cement  and  2.75  parts  fine  testing  sand,  by 
weight,  shall  be  equal  to  or  higher  than  the 
values  specified  for  the  ages  indicated  below: 

1  day  in  moist  air 1,300         

1  day  in  moist  air,    2  days  in  water 1,000  750  3,000         

1  day  in  moist  air,    6  days  in  water 2,000  1,500         800  1,000 

1  day  in  moist  air,  27  days  in  water 3,000  3,000  f  2,000  2,200 

*  See  Note,  Section  1. 

**  The  purchaser  should  specify  the  type  of  setting  time  test  required.  In  case  he  does  not  so  specify,  the 
requirement  of  the  Gillmore  test  only  shall  govern. 

f  The  purchaser  should  specify  the  type  of  strength  test  required.  In  case  he  does  not  so  specify,  the  re- 
quirements of  the  tensile  strength  test  only  shall  govern.  The  strength  at  any  age  shall  be  higher  than  the 
strength  at  the  next  preceding  age.  Tests  at  28  days  on  Types  I  and  II  cement  may  be  waived  at  the  option 
of  the  purchaser.  If,  at  the  option  of  the  purchaser,  a  28-day  test  is  required  on  type  III  cement,  the  strength 
at  28  days  shall  be  higher  than  at  3  days. 


Masonry 313 

5.  That  ratios  of  the  strengths  of  autoclaved  neat  and  standard  mortar 
briquettes  to  the  30-hour  strengths  of  companion  moist-cured  briquettes  showed 
a  general  trend  toward  lower  values  as  the  autoclave  expansion  of  the  cement 
increased. 

Prior  to  1936,  the  ASTM  specifications  did  not  permit  the  use  of  grinding  agents 
or  plasticizers  in  the  manufacture  of  Portland  cement.  The  decrease  in  strength  which 
resulted  from  their  use  was  probably  the  reason  they  were  not  permitted  to  be  used. 

In  recent  years  there  has  been  an  increasing  realization  that  other  qualities  of  con- 
crete, such  as  plasticity,  prevention  of  bleeding,  resistance  to  the  action  of  frost  and 
corrosive  waters,  have  been  neglected  and  in  attempting  to  effect  improvement  in  these 
qualities  the  use  of  additions  to  Portland  cement  during  manufacture  has  been 
re-examined.  Some  of  these  additions  are  primarily  manufacturing  aids.  We  believe  that 
this  development  is  of  sufficient  importance  to  justify  a  report  at  this  time. 

Comments  upon  some  of  these  additions  follow:* 

Stearic  Acid. — This  is  an  effective  grinding  agent.  The  addition  of  about  0.1  percent 
of  it  improves  grinding  efficiency  from  15  to  25  percent.  It  is  effective  in  preventing  ball 
coating.  It  is  a  fair  plasticizer,  introduces  considerable  air  into  mortar  and  reduces 
bleeding. 

Stearic  acid  is  one  of  the  best  waterproofing  agents,  but  for  effective  watertightness 
not  less  than  one  percent  must  be  used.  Mortars  containing  interground  stearic  acid  are 
lower  in  strength  than  similar  mortars  not  containing  stearic  acid.  The  reduction  will 
amount  to  about  10  percent  when  small  amounts  of  0.1  percent  or  less  are  used  and  may 
amount  to  as  much  as  30  percent  when  1  percent  is  used. 

Materials  which  are  less  refined  than  stearic  acid  but  have  essentially  the  same 
properties  are  tallow  and  crude  packing  house  grease. 

To  a  lesser  extent,  tankage  flakes  may  be  placed  in  the  same  category.  They  have 
been  found  to  be  even  more  effective  than  stearic  acid  or  the  greases  in  contributing  to 
fatness  and  water  retention  to  mortar.  The  strength  reduction  resulting  from  the  use  of 
tankage  flakes  is  greater  than  that  obtained  with  the  greases  and  the  improvement  in 
grinding  efficiency  is  less. 

Metal  soaps  of  Stearic  Acid. — This  group  consists  of  calcium  stearate,  aluminum 
stearate  and  magnesium  stearate.  The  behavior  of  these  materials  is  similar  to  that  of 
stearic  acid  except  that  larger  amounts  are  required  to  produce  the  same  result. 

Vegetable  and  Animal  Oils. — In  this  group  may  be  placed  fish  oil,  hydrogenated  fish 
oil,  oleic  acid,  and  cottonseed  oil  foots.  These  materials  are  effective  grinding  agents, 
0.1  percent  being  sufficient  to  improve  grinding  efficiency  from  10  to  20  percent.  They 
are  moderate  plasticizers  which  introduce  air  into  the  mortar  or  concrete  and  reduce 
bleeding.  They  have  not  been  found  to  be  as  effective  waterproofers  as  the  greases. 

Rosin. — This  has  been  found  to  be  one  of  the  most  effective  of  all  the  grinding 
agents,  0.1  percent  being  sufficient  to  improve  grinding  efficiency  from  20  to  30  percent. 
Rosin  is  also  one  of  the  most  effective  of  plasticizing  or  fattening  agents  and  will  prac- 
tically eliminate  bleeding  in  workable  concrete.  It  introduces  a  large  amount  of  air 
into  the  mix,  and  once  introduced  the  air  tends  to  remain  until  the  mix  has  hardened. 
The  water  retention  of  mortar  containing  rosin  is  high.  Mortars  containing  rosin  also 
show  greatly  improved  resistance  to  freezing  and  thawing. 

*  The  information  presented  on  additions  to  Portland  cements  is  based  on  an  unpublished  paper  by 
Mr.  L.  A.  Wagner,  chief  research  chemist,  Missouri  Portland  Cement  Company,  presented  at  the 
meeting  of  ASTM  Committee  CI  on  Cement  held  on  March  18  and  19,  1940. 


314 Masonry 

A  decrease  in  strength  results  from  the  introduction  of  rosin  into  the  cement.  How- 
ever, because  of  improved  plasticity,  the  water  requirement  of  a  mix  containing  rosin  is 
decreased,  which  partially  offsets  the  strength  reduction  brought  about  by  the  decrease 
in  mortar  density. 

Vinsol  resin,  which  is  a  processed  wood  rosin,  exhibits  essentially  the  same  prop- 
erties as  gum  rosin  except  that  it  is  not  so  potent  either  as  a  grinding  agent  or  as  a 
plasticizing  agent.  Owing  to  commercial  reasons,  (cheapness  and  powdered  form)  this 
is  the  form  of  resin  most  used. 

Paraffin  Wax. — ^This  material  was  found  to  have  no  value  either  as  a  grinding 
agent,  plasticizing  agent  or  waterproofer. 

Waste  Sulphate  Liquor  and  Sulphonated  Sludge. — ^Waste  sulphate  liquor  is  a  by- 
product of  the  paper  industry  and  is  marketed  by  one  manufacturer  as  Raylig.  Sul- 
phonated petroleum  sludge  is  a  by-product  resulting  from  the  sulphonation  of  petroleum 
in  the  manufacture  of  white  oils.  The  Standard  Oil  Company  of  Indiana  markets  this 
material  under  the  trade  name  of  XGA  soap  oil.  Both  are  effective  grinding  and  plasti- 
cizing agents,  about  0.1  percent  of  Raylig  and  0.25  percent  of  soap  oil  being  required 
for  effective  results.  That  a  larger  amount  of  soap  oil  is  required  is  probably  due  to  the 
fact  that  it  contains  about  50  percent  water.  These  materials  introduce  a  large  amount 
of  air  into  the  mortar  or  concrete  and  reduce  bleeding.  However,  the  air  is  not  retained 
to  as  large  an  extent  as  in  similar  mixes  containing  rosin. 

Coal  and  Carbon  Black. — Soft  coal  has  long  been  known  as  a  grinding  agent  and 
has  been  used  by  cement  producers  to  clean  out  grinding  mills  in  which  the  balls  have 
been  badly  coated.  Carbon  black  is  somewhat  more  effective  than  coal  as  a  grinding 
agent.  These  materials  have  little,  if  any,  plasticizing  value  and  do  not  reduce  bleeding. 
It  has  also  been  reported  that  mortars  containing  these  materials  do  not  stand  up  well 
under  freezing  and  thawing. 

TDA. — This  is  a  proprietary  product,  a  combined  catalyst  and  dispersing  agent.  It 
is  a  mixture  of  triethanolamine  salts  and  highly  purified  soluble  calcium  salts  of  modified 
lignin  sulphonic  acids.  According  to  the  ASTM  it  is  not  harmful  when  used  as  an  addi- 
tion to  Portland  cement.  It  is  reported  to  be  a  powerful  grinding  aid  and  has  a  marked 
effect  in  increasing  the  durability  of  concrete  as  measured  by  freezing  and  thawing. 

Bentonite  (finely  divided  clay)  and  Hydrated  Lime. — These  materials  do  not  have 
any  value  as  grinding  agents  but  are  often  recommended  as  plasticizers.  Bentonite  is  an 
effective  plasticizer  but  for  a  given  consistency  it  requires  more  water  in  the  concrete  mix 
and  this  reduces  the  strength.  The  addition  of  3  percent  of  Bentonite  has  been  found  to 
greatly  reduce  the  resistance  to  freezing  and  thawing. 

Additions  of  dry  hydrated  lime  were  found  to  contribute  little,  if  any,  to  the 
plasticity  of  mortar  mixes.  However,  aged  lime  putty  showed  greater  plasticity  and 
fatness  in  mortar  than  the  other  materials  tested. 

Inert  Fillers. — Inert  fillers,  such  as  limestone  dust,  various  forms  of  silica,  clays, 
slags,  and  fly  ash  are  widely  used  as  plasticizers  in  mortar  and  concrete.  These  materials 
are  generally  added  in  amounts  of  10  to  25  percent  by  weight  of  the  cement.  If  these 
materials  are  interground  with  Portland  cement,  the  resulting  products  are  more  prop- 
erly classified  as  blended  cements  and  are  considered  to  be  outside  the  scope  of  this 
report. 


I 


Masonry  315 


Report  on  Assignment  9 
Specifications  for  Culvert  Pipe 

Theodore  Doll  (chairman,  subcommittee),  A.  N.  Laird,  J.  A.  Lahmer,  R.  L.  Mays,  J.  L. 
Rippey,  F.  B.  Robins,  E.  O.  Sweetser,  Jamison  Vawter. 

The  following  specifications  were  presented  as  information  last  year,  and  the  com- 
mittee now  recommends  that  they  be  adopted  for  publication  in  the  Manual. 

SPECIFICATIONS  FOR  THE  PLACEMENT  OF  CONCRETE 
CULVERT  PIPE 

1.  Scope 

These  specifications  cover  the  placement  of  concrete  culvert  pipe  for  railway  culverts. 

2.  Bedding 

The  pipe  shall  be  placed  on  a  cushion  of  earth  or  other  finely  granular  material, 
or  on  a  cast-in  place  concrete  cradle,  as  illustrated  in  Figs.  1,  2,  and  3.  The  surface  on 
which  the  pipe  rests  shall  be  so  shaped  that  the  reaction  will  be  distributed  as  nearly 
uniformly  as  possible  over  a  horizontal  width  of  not  less  than  six-tenths  of  the  outside 
diameter  and  all  possibility  of  concentration  of  the  reaction  at  or  near  the  vertical 
diameter  eliminated.  If  pipe  having  a  projecting  bell  is  used,  the  surface  on  which  the 
pipe  rests  shall  be  shaped  to  fit  the  bell,  as  well  as  the  barrel  of  the  pipe.  The  acceptable 
methods  of  beddmg  are  illustrated  in  Figs.  1,  2,  and  3,  and  the  Engineer  shall  specify 
which  method  is  to  be  used,  depending  on  the  superimposed  load  and  the  strength  of 
the  pipe. 

3.  Foundation  and  Camber 

(a)  If  the  material  under  the  bedding  cushion  or  cradle  is  sufficiently  firm  to 
maintain  the  culvert  on  the  established  line  and  grade,  cambering  of  the  pipe  line  will 
not  be  required. 

(b)  If  the  foundation  is  such  that  it  may  be  expected  to  yield  a  limited  amount, 
which  can  be  estimated  with  reasonable  accuracy,  the  culvert  shall  be  placed  with  suffi- 
cient camber  to  ensure  that  it  will  not  have  a  sag  at  the  end  of  the  settlement.  The 
camber  shall  be  constructed  by  laying  approximately  one-half  of  the  length  of  the 
culvert  at  the  upstream  end  horizontally,  or  on  a  grade  equal  to  about  half  of  the 
average  grade  of  the  culvert,  and  the  remainder  on  a  sufficient  grade  downstream  to 
provide  the  necessary  camber  or  additional  grade  required.  No  section  of  pipe  shall  be 
placed  higher  than  the  one  at  the  upstream  end. 

(c)  If  the  foundation  is  soft  or  spongy,  an  adequate  support  shall  be  supplied  by 
excavating  the  unstable  soil  and  backfilling  with  firm  material,  by  laying  a  timber  mat 
on  the  unstable  soil,  or  by  such  other  means  as  may  be  specified  or  approved  by  the 
Engineer. 

(d)  If  the  foundation  is  muck,  or  similarly  yielding  material,  the  pipe  shall  be 
bedded  above  a  continuous  platform  supported  on  piling,  or  by  such  other  means  as 
may  be  specified  or  approved  by  the  Engineer. 

4.  Backfill  and  Embankment 

The  filling  around  and  over  the  culvert  shall  be  placed  in  accordance  with  one  or 
more  of  the  methods  outlined  in  Figs.  4  to  9,  inclusive,  as  specified  by  the  Engineer.  The 


316 


Masonry 


//- 


1.    Mk=Bc  +  4-' 


-£4ri-h 


■73- 


~m.^^ 


0;^i?/N/\Rr  Bedding 


■m-fper  ft.  ofH,  hut 
noi  /ess  than^' 


F'<s.i 


p;v?z^5"^^^7?r^ 


■£'arif'^  /^oroey/^/u  i^/jw'i 


-£an^^  accurate hf  s/ja/pecf  to  fit jv/'/je- 


■m.=^  per  ft.  of  H,  t;i/t- 
/;ot  k^5  t/!<^ri  8" 


/i/ff.' 


-/*//>}.'  ^,  /i)(/t/rot  /ess  /^an  6 


Pro  yide  c  ushion  if 
concrete.  I's  c<3st 
before  pipe  is  phced 

^Co/^crsfe.,  cc(st  /'n  p/ace. 

'i'  ~x.-'l^~'iBottorrj  of  concrete,  /n 
^arxf  rr7<ftar/a/- 


CotYc/r£T£.  C/^/iDL£:  ^£:Dj:)//i<^ 


Ft^.3 


filling  shall  in  all  cases  be  placed  alternately  on  each  side  of  the  culvert,  in  approxi- 
mately equal  layers,  and  necessary  care  shall  be  taken  to  avoid  displacing  the  pipe.  Rock 
fill  shall  not  be  dumped  over  the  culvert  without  a  sufficient  cushion  of  earth  to  prevent 
breakage. 

5.  Jacking  Pipe  Through  Fills 

Pipe  used  for  jacking  through  fills  shall  be  without  projecting  bells.  The  tongue 
shall  preferably  be  at  the  downstream  end.  A  ring  of  tarred  or  bitumen-coated  rope 
shall  be  placed  around  the  tongue  of  each  pipe  section  at  the  joints,  to  prevent  the 


Masonry 


317 


7^05/r/i/£  7^/?oj'£cr/o/v  Ca/yD/r/o/i 


Z£^0   P?i'OS£CT/0/Y  Co/yD/T/Ofi 


-'/Yafcra/  0roc/ncf 


compaotscf 


'^/O  <y/^  fyV/y 


O^D/zy/j/rr  Z)/rcj^  CoAfD/r/0/y 


res,! 


entrance  of  water  during  construction  and  to  form  an  annular  space   for  sealing  with 
mortar  from  the  inside  after  the  jacking  has  been  completed. 

Jacking  frames  shall  be  so  constructed  as  to  avoid  breaking  the  pipe  or  forcing  it 
out  of  alinement.  The  pipe  shall  preferably  be  jacked  upgrade  to  provide  drainage  at 
the  heading  during  excavation.  Satisfactory  means  shall  be  provided  for  maintaining  the 
lead  pipe  in  the  correct  grade  and  direction.  If  the  line  shows  signs  of  developing  exces- 
sive resistance  to  movement,  jacking  shall  be  carried  on  continuously  until  the  jacking 
of  the  entire  culvert  has  been  completed. 


318 


Masonry 


^ 


//^////////////-i///0//0////lTo^  o, 


!»: 


1 


'■■ — ^ 


I 


&-/y4^(//'a/  (^rocncf 


Afoj)/n£p    Z)/TCM     Cor/XJ/T/o/Y 


/7<?.r? 


f3^ 


f^T^riSyi^OSscf  Yo^   of  £^/7T Ac^fi/r^rfery^-y 


\ 


r~/^/'/7a/   Top  of 


/ 


A^ 


/v>y/  S/^e^ 


S^'concZ  S^ep 


•-^ 


ft.     !>-    ^ 


Ca/rr/j/e^ec/  ^;^c// 


/^z.7-j^/r/Y/}r£  /^ojp/F/Ej}  D/rcf/  Co/ip/r/o/^ 


/^;?.f 


6.  Constructing  Culverts  in  Tunnel 

When  it  is  necessary  to  place  pipe  culverts  by  tunneling,  plans  shall  be  prepared  for 
the  construction  procedure  and  timbering. 


7.  Joints 

(a)  Bell  and  spigot  pipe  shall  preferably  be  bedded  with  the  bell  end  upstream. 
The  interior  surface  of  the  bell  shall  be  thoroughly  cleaned  and  wetted,  and  the  lower 
portion  filled  with  a  stiff  mortar  of  sufficient  thickness  to  make  the  inner  surfaces  of 
the  abutting  sections  flush.  The  spigot  end  of  the  next  section  shall  also  be  cleaned  and 


Masonry 319 

wetted,  and  fitted  into  the  bell  so  that  the  sections  are  closely  matched.  The  annular 
space  in  the  bell  shall  then  be  filled  with  mortar  and  the  inner  surface  of  the  pipe  brushed 
smooth  at  the  joint. 

(b)  Tongue  and  groove  pipe  shall  preferably  be  laid  with  the  groove  upstream. 
A  shallow  excavation  shall  be  made  underneath  the  pipe  at  the  joint,  and  filled  with 
stiff  mortar  into  which  the  next  section  of  pipe  is  laid.  The  groove  end  of  the  first  pipe 
shall  be  cleaned  and  wetted,  and  a  layer  of  mortar  applied  to  the  lower  half  of  the 
groove.  The  tongue  end  of  the  next  section  shall  also  be  cleaned  and  wetted,  and  a  layer 
of  mortar  applied  to  the  upper  half  of  the  tongue.  The  tongue  shall  then  be  fitted  into 
the  groove  and  shoved  in  place  so  that  part  of  the  mortar  is  squeezed  out,  and  the  sec- 
tions closely  matched.  The  inner  surface  shall  then  be  brushed  smooth  at  the  joint. 

(c)  Joints  in  pipe  that  is  jacked  in  place  shall  not  be  sealed  with  mortar  untQ  the 
jacking  of  the  culvert  has  been  completed. 


The    committee   recommends    that    the    subject    be    continued    under    the   following 
designation:   "Maintain   contact  with  ASTM  Committee  C-13,   Concrete  Pipe." 


Report  on  Assignment  11 

Pressure  Grouting 

W.  M.  Ray  (chairman,  subcommittee),  F.  W.  Capp,  Maurice  Coburn,  G.  F.  Eberly, 
W.  A.  Kingman,  Roscoe  Owen,  O.  V.  Parsons,  I.  L.  Pyle,  G.  E.  Robinson,  C.  H. 
Splitstone. 

Your  committee  offers  the  following  specifications  as  information  with  the  intention 
of  recommending  their  adoption  and  publication  in  the  Manual  next  year. 

SPECIFICATIONS   FOR   SOLIDIFICATION   OF   MASONRY 
STRUCTURES  BY  PRESSURE  GROUTING 

1.  Drilling 

Before  undertaking  a  grouting  project,  it  may  be  advisable  to  drill  holes  of  a 
minimum  diameter  ol  1%  inches  to  develop  the  conditions  and  extent  of  the  required 
operation,  these  holes  to  be  used  later  in  the  appHcation  of  grout.  The  number  of  such 
holes  shall  be  sufficient  to  permit  observation  and  insure  the  filling  of  all  voids  and  shall 
be  approved  by  the  Engineer. 

2.  Description 

Grout. — The  grout  shall  consist  mainly  of  neat  Portland  cement  and  water  in  pro- 
portions varying  usually  according  to  local  requirements  from  a  minimum  of  S  gallons 
to  a  maximum  of  12  gallons  of  water  per  sack  of  cement.  Operations  shall  be  started 
with  a  definite  water-cement  ratio,  introducing  SO  percent  of  the  water  into  the  mixer 
before  the  dry  ingredients,  and  the  remaining  water  during  mixing.  If  required  by  the 
Engineer  in  charge,  fluidity  must  be  controlled  by  tests  through  a  standard  flow  cone.* 


*  Standard  flow  cones  described  by  Portland  Cement  Association,  33  West  Grand  Avenue,  Chicago, 
111.  See  Concrete  for  Railways,  Vol.  3,  No.   1,  page  9. 


320 Masonry 

3.  Materials 

(a)  Cement. — The  cement  shall  be  finely  ground  Portland  cement  of  which  not  less 
than  90  percent  shall  pass  a  No.  200  sieve,  as  coarse  particles  may  prevent  the  desired 
penetration,  and  shall  in  other  particulars  comply  with  AREA  Specifications  for  Portland 
Cement   (AREA  Manual,  page  8-9— Same  as  ASTM  Designation  C-9-38). 

(b)  Sand. — Sand  may  be  added,  at  the  direction  of  the  Engineer,  where  satisfactory 
penetration  can  be  secured  in  varying  proportions  up  to  1  :  1  mix  by  volume.  All  sand 
should  pass  a  No.  28  mesh  sieve  and  have  large  proportions  of  fines  passing  SO  and  100- 
mesh  sieves,  and  shall  in  other  particulars  comply  with  AREA  Specifications  for  Fine 
Aggregate   (Manual  page  8-1,  2). 

(c)  Water. — The  water  shall  comply  with  requirements  for  mixing  water,  for  Port- 
land Cement  Concrete,  AREA  Manual  page  8-2. 

(d)  Admixtures. — No  admixture  shall  be  used  unless  approved  by  the  Engineer. 

4.  Apparatus 

The  apparatus  shall  consist  of  a  mixer  discharging  to  a  receiver  supplied  with  a 
suitable  agitator  from  which  the  grout  may  be  discharged. 

(a)  By  Gravity. — Grout  may  be  deposited  directly  through  an  open  funnel  or  spout 
or  may  be  conveyed  up  to  SO  feet  through  a  2J<^-inch  fire  hose. 

(b)  By  Pneumatic  Pressure  on  the  Receiver. — For  this  method  an  air  tight  re- 
ceiver, equipped  with  an  air  driven  agitator,  shall  be  suppUed.  The  grout  mixed  eithei 
in  a  mechanical  mixer  or  by  hand  shall  be  delivered  to  the  receiver  and  air  pressure 
applied  to  expel  the  contents  through  suitable  transmission  pipes  to  the  point  of  applica- 
tion through  sealed  connections  at  the  drill  holes.  When  used  in  cold  weather,  the  entire 
apparatus  should  be  heated  to  maintain  the  deUvery  temperature  of  grout  up  to  80 
degrees  F.  A  shotcrete  gun  may  be  remodeled  readily  for  this  pressure  operation.! 

(c)  By  Pump. — When  pumps  are  used  for  ordinary  quantities  and  conditions,  effi- 
cient hand  pumps  are  available  which  have  the  advantage  of  direct  control  of  pressure 
and  quantities  applied.  Grout  may  be  drawn  into  the  cylinders  of  a  reciprocating  pump 
and.  propelled  directly  into  the  discharge  pipe.  Delivery  shall  be  as  nearly  continuous  as 
possible,  which  is  best  attained  by  a  rotary  pump,  satisfactory  types  of  which  have  been 
developed. 

5.  Pressures 

Required  pressures  may  vary  widely  depending  on  the  application  desired  and  the 
character  of  the  structure  and  shall  be  strictly  under  the  direction  of  the  Engineer  in 
charge.  The  range  of  probable  requirements  is  as  follows: 

(1)  Small  unit  masonry  jobs — gravity  to  30  lb.  per  sq.  in. 

(2)  Structural  repairs  by  drill  holes  30  to  SO  feet  deep — gravity  to  100  lb.  per  sq.  in. 

6.  Payment 

Including  furnishing,  operation  and  maintenance  of  all  equipment  and  supplying 
all  materials  required. 

(1)  Lump  sum  price  for  equipment  moved  to  and  from  the  job. 

(2)  Drilling diameter  holes  at  per  Hneal  foot. 

(3)  Grout  cement  in  place  at   per  sack. 

(4)  Sand cubic  yards  in  place  at per  cubic  yard. 

t  Engineering  News  Record,  June  22,  1939,  pages  61  and  62. 


Masonry  321 


Report  on  Assignment  12 

Specifications  for  Concrete  and  Reinforced  Concrete  Railroad 
Bridges  and  Other  Structures 

C.  H.  Splitstone  (chairman,  subcommittee),  F.  E.  Bates,  Hardy  Cross,  G.  H.  Dayett, 
Meyer  Hirschthal,  L.  H.  Hornsby,  M.  L.  Johnson,  J.  E.  Kalinka,  J.  A.  Lahmer, 
A.  N.  Laird,  C.  P.  Marsh,  J.  L.  Rippey,  G.  E.  Robinson,  C.  P.  Schantz,  G.  E.  Shaw, 
G.  R.  Smiley,  A.  W.  Smith,  J.  H.  Titus,  W.  R.  Wilson,  J.  J.  Yates. 

Your  committee  reports  progress  as  follows: 

A  skeleton  outline  for  the  specifications  has  been  prepared  and  the  subject  matter 
is  being  developed  by  comparing  the  present  specifications,  topic  by  topic,  with  those  of 
25  or  30  railroads  and  public  bodies,  utiHzing  the  material  therein  insofar  as  it  is  found 
to  be  of  value  in  specifying  modern  concrete  construction.  Of  special  value  in  this  pro- 
cedure is  the  report  of  the  Joint  Committee  on  Specifications  for  Concrete  and  Rein- 
forced Concrete.  This  is  the  most  comprehensive  and  up  to  date  work  on  the  subject 
available  to  the  committee,  which  is  giving  it  corresponding  weight  in  its  work. 

It  is  the  purpose  of  your  committee  to  separate  the  subject  matter  as  between 
specifications  and  recommended  practice,  as  has  been  done  by  the  Joint  Committee. 
The  greater  part  of  the  specifications  has  been  developed  and  a  start  has  been  made  on 
the  recommended  practices. 


Report  on  Assignment  13 

Specifications  for  Test  Borings 

Collaborating  with  Committee  1 — Roadway  and  Ballast 

W.  R.  Wilson  (chairman,  subcommittee),  G.  H.  Dayett,  Theodore  Doll,  R.  Hayes,  W.  A. 
Kingman,  R.  L.  Mays,  Roscoe  Owen,  O.  V.  Parsons,  C.  H.  Splitstone.  Jamison 
Vawter. 

The  following  report  is  submitted  as  information.  The  table  on  page  323  and  the 
Specifications  for  Test  Borings  are  presented  with  the  intention  of  submitting  them  in 
1942  for  adoption  and  publication  in  the  Manual. 

To  be  of  any  value,  subsurface  exploration  must  determine  the  location  and  thick- 
ness of  each  stratum  of  soil  encountered  for  the  required  depth  of  the  bore,  and  also 
classify  the  type  of  soil  in  each  strata. 

The  following  are  the  methods  which  will  furnish  such  data  and  suitable  samples 
of  the  types  of  soil  encountered: 

Test  Pits 

The  best  method  for  determining  subsurface  conditions  is  to  dig  a  test  pit.  With  a 
test  pit  it  is  possible  to  examine  soil  conditions  in  the  natural  state  and  to  locate  accu- 
rately any  strata  of  running  sand.  The  ground  water  elevations  can  also  be  more  exactly 
determined  than  by  any  other  means.  Undisturbed  samples  of  plastic  soil  can  be  secured 
for  laboratory  analysis.  Due  to  the  difficulty  of  controUing  the  water,  the  cost  of  remov- 
ing the  soil  and  the  heavy  sheeting  required  to  protect  the  walls,  test  pits  are  not 
practical  in  most  cases.  Exploration  of  the  site  by  other  methods  may  indicate  the  need 
for  test  pits  to  solve  adequately  the  foundation  problem. 


322 Masonry 

Augers 

Auger  borings  can  be  used  for  shallow  depths  and  in  cohesive  soils.  Where  soil  con- 
ditions are  found  by  other  methods  to  be  uniform,  a  check  of  the  uniformity  can  be 
made  by  auger  borings  at  intermediate  points  between  test  borings  spaced  relatively  far 
apart.  Samples  are  difficult  to  obtain  in  granular  soils  or  where  ground  water  is  en- 
countered. The  cost  is  high  for  deep  auger  borings.  Samples  taken  from  the  auger  are 
disturbed  and  in  plastic  material  care  must  be  taken  in  classifying  the  samples  so  secured. 

Dry  Sample  Borings 

Dry  sample  boring  is  the  method  most  used  for  underground  exploration  in  soil. 
The  term  "dry  sample"  is  the  common  name  for  this  process.  This  name  is  misleading 
in  that,  when  taken  in  wet  soils  or  below  the  ground  water  line,  the  sample  is  not  dry. 

The  method  of  procedure  is  to  sink  a  hole  by  means  of  wash  boring,  i.e.,  where 
water  under  pressure  goes  through  a  wash  pipe  equipped  at  the  lower  end  with  a  chop- 
ping bit.  The  wash  pipe  is  churned  up  and  down  and  rotated,  thus  loosening  the  soil 
at  the  bottom  of  the  hole,  the  loosened  soil  then  being  carried  out  of  the  hole  by  the 
upward  flow  of  the  wash  water.  The  casing  is  driven  as  the  boring  progresses.  The 
nature  of  the  soil  carried  to  the  surface  by  the  wash  water  has  been  completely  changed 
due  to  the  action  of  the  chopping  bit  and  the  wash  water,  therefore,  it  is  valueless  in 
determining  the  characteristics  of  the  strata  encountered.  "Dry  samples"  are  taken 
whenever  the  characteristics  of  the  soil,  as  indicated  by  the  wash  water  and  the  feel 
of  the  wash  pipe,  change.  They  are  taken  by  pumping  out  the  loosened  soil  in  the  hole, 
removing  the  string  of  wash  pipe  and  substituting  a  sampling  spoon  or  open  piece  of 
pipe  for  the  chopping  bit.  The  wash  pipe  and  sampling  bit  are  then  lowered  in  the  hole 
and  driven  into  the  soil.  The  spoon  is  removed  and  the  sample  taken  from  it,  identified, 
placed  in  a  container,  completely  labeled  and  retained  as  part  of  the  record.  The  ordi- 
nary sample  so  obtained  has  been  disturbed  but  it  contains  the  same  proportions  of 
grains  as  does  the  strata  sampled.  To  determine  the  consistency  of  the  strata,  a  record 
is  kept  of  the  weight  of  hammer  and  number  of  blows  required  to  drive  the  spoon  for 
one  foot.  A  casing  as  small  as  two  inches  in  diameter  may  be  used  with  corresponding 
samples  1^  in.  in  diameter. 

Undisturbed  sampling  is  the  term  used  for  the  method  of  obtaining  undisturbed 
samples  of  plastic  soil  for  laboratory  investigation,  however,  it  is  impossible  to  obtain 
completely  undisturbed  samples.  Many  types  of  sampling  spoons  have  been  used  with 
varying  degrees  of  success.  The  minimum  size  of  sample  that  can  be  investigated  in  the 
laboratory  is  4^4  in-  The  method  of  boring  the  test  hole  is  the  same  as  for  dry  sample 
boring.  Due  to  the  large  size  of  casing  required  for  undisturbed  samples  and  the  care 
with  which  they  must  be  taken,  the  cost  of  such  investigation  is  high. 

Core  Borings 

To  secure  samples  of  rock  or  boulders  it  is  necessary  to  take  core  borings.  The 
term  core  boring  refers  to  the  securing  of  samples  of  rock  by  means  of  rotary  drilUng 
tools  equipped  with  special  cutting  tools.  The  cutting  tools  are  of  three  types,  namely; 
black  diamond,  shot  drills  and  toothed  steel  cutters.  The  nature  of  the  rock  to  be  sam- 
pled and  the  size  of  core  required  will  determine  the  type  of  cutting  tool  to  be  used  on 
the  particular  job.  Cores  %  in.  in  diameter  can  be  made  with  a  diamond  drill  but  the 
smallest  commercial  size  is  1^  in.  Cores  more  than  four  inches  in  diameter  are  seldom 
made  with  diamond  tools.  Shot  drill  cores  less  than  two  inches  in  diameter  are  difficult 
to  make.  Cores  up  to  52  in.  in  diameter  have  been  taken.  Steel  toothed  cutters  have 


323 


TABLE  I  -  METHODS  OF  UNDEROROUITD  EXPLORATION  AND  SAMPLING  * 


Conmon  Nam© 

Materials  In 

Method  of 

Method  of 

Approx.  Cost 

Value  for- 

of  Method 

Which  Used 

Advancing  the 
Hole 

San^ling 

per  ft. 

Founda- 
tion 
Purposes 

Wash  Sample 

All   soils.  Can- 

Washing inside 

Samples  re- 

♦0.50 to  »1.25 
per  ft.  2  l/2" 

Almost 

Borings 

not  penetrate 

a  driven  cas- 

covered from 

valueless 

boulders  or 

ing. 

the  wash 

casing. 

and  dan- 

rock. 

water. 

gerous 
beoause 
results 
are  de- 
ceptive. 

Dry  Sample 

All   soils.  Can- 

Washing inside 

Open  end  pipe  ♦0.65  to  Jl .75 

Most  re- 

Boring 

not  penetrate 

a  driven  cas- 

or spoon 

per  ft,  2" 
and  2  l/2" 

liable  of 

boulders  or 

ing. 

driven  into 

inexpen- 

rock. 

soil  at  bot- 
tom of  bore 
hole. 

casing. 

sive 

methods. 
Data  on 
compao- 
tion  of 
soil  ob- 
tained by 
measuring 
penetra- 
tion re- 
sistance 
of  spoon. 

"UndiVtairbeof  Samples  obtained 

;  Usually  wash- 

Special sam- 

JH.OO to  J12:00  Used  prii- 

Sampling 

only  from  oo- 

ing  inside  a 

pling  spoon 

per  ft. 

marily  to 

hesive   soils. 

6"   Basing. 

designed  to 

6"  casing. 

obtain 

Augers 

recover  large 

samples 

may  be  used. 

samples. 

of  oom- 
pressible 
soils  for 
labora- 
tory 
study. 

Auger  Bor- 

Cohesive  soils 

Augers  rotated 

Samples  re- 

$0.75 to  $2.00 

Satis- 

ing. 

and  oohesionless 

;  until  filled 

covered  from 

per  ft. 

factory 

soils  above 

with  soil  and 

soil  brought 

1  l/2"  auger. 

for  high 

ground  water 

then  removed  to 

up  on  augers. 

way  ex- 

elevation. 

surface . 

ploration 
at  shal- 
low 
depths . 

Well 

All  soils. 

Chum  drilling 

Bailed  sample 

?5.nO  to  J15.00  "Clay 

Drilling 

boulders,   and 

with  power 

of  churned 

per  ft. 

socket" 

rook. 

machina . 

soil  or  sam- 
ples from 
"clay  sock- 
et". 

6"  to  8"  hole. 

samples 
are  dry 
samples. 
Bailed 
samples 
are  value- 
less. 

jCocimon  Name  Materials  in 

Method  of 

Method  of 

Approx.  Cost 

Value  for 

of  Method 

Which  Used 

Advancing  the 
Hole 

Sampling 

per  ft. 

Founda- 
tion 
Purposes 

Rotary 

All   soils. 

Rotating  bits 

Samples  re- 

Samples 

Drilling 

boulders,   and 

operating  in  a 

oovcred  from 

are  of  no 

rock. 

heavy  circula- 
ting liquid. 

circulating 
lio.uid 

value. 

Core 

B(7Ulders,    sound 

Rotating  coring 

Cores  cut  and 

^  $3-50  to  $35.60  Best-     - 

BorLngs 

rock  and  froren 

tools:   diamond 

recovered  by 

per  ft. 

method  of 

soils. 

shot,  or  8t««l- 

tooth  cutters. 

tool s . 

1-1/8"  to  36" 

determin- 
ing char- 
acter and 
condition 

of  rook. 

Test  Pits 

All   soils.  In 

Hand  digging  in 

Samples  taken 

1  $10.00  and  up 

Soils  can 

pervious   soils 

sheeted  or  lag- 

by hand  from 

depending  on 

be  inspec- 

below ground 

ged  pit.     Power 

original  po- 

plan size. 

ted  in 

water  level 

excavation  oo- 

sition  in 

depth,  vmter 

natural 

pneuffiotio 

casionally  used 

.  ground. 

and  soil  con- 

condition 

caisson  or 

dition. 

and  posi- 

loviering of 

tion. 

ground  water 

is  necessary. 

¥ 


1.  Test  rods,   sounding  rods,  jet  problngs,  geophysical  methods,  oto„aro  nof 
included  in  this  table,  because  no  soil  samples  are  obtained. 

2.  The  approximate  costs  per  foot  of  the  various  methods  vary  between  wide 
limits  because  of  the  lar,;e  number  of  factors  which  govern  the   cost.     A  few 

of  those  factors  arei  character  of  soil,  depth  of  hole,  number  of  obstruotions 
encountered,  total  footage  of  boring  or  drilling  at  given  site,  aooessibilily 
of  site,   etc. 

From  Exploration  of  Soil  Conditions  and  Sampling  Operations, , by  H.  A.  Uohr, 
Second  Edition,  February  19l*0,  Publication  Ho.  269,  Grftduato  School  of  EMgl- 
neorlng.  Harvard  University. 


324         Masonry 

proved  successful  only  in  certain  of  the  softer  types  of  rock.  The  size  of  cores  so  taken 
is  the  same  as  for  the  diamond  drill. 

Miscellaneous  Methods 

Various  other  methods  are  used  for  drilling  holes  in  the  earth.  These  methods  are 
valueless  for  exploration  work  in  that  samples  are  not  taken,  or  if  taken,  are  so  changed 
that  it  is  impossible  to  identify  the  class  of  soil  from  them.  Some  of  these  methods  are: 
Wash  borings,  well  drilling  and  rotary  drilling,  such  as  is  used  for  oil  wells. 

Test  rods,  sounding  rods  and  jet  probings  are  useful  means  for  determining  the 
elevation  of  rock  or  boulders  but  they  do  not  give  any  indication  of  the  kind  of  rock 
or  the  type  of  soil  overlying  the  rock.  Care  must  be  used  in  forming  conclusions  from 
the  results  of  such  soundings. 

Geophysical  methods  of  exploration  have  been  developed  for  prehminary  explora- 
tion of  large  areas.  These  methods  are  the  electric  resistivity  method  and  the  seismo- 
graphic  method.  The  results  of  exploration  by  these  methods  when  used  for  design  and 
construction  must  be  checked  by  test  borings,  hence  these  methods  are  not  practical  for 
ordinary  exploration  for  specific  projects. 

The  accompanying  table  is  a  summary  of  the  present  methods  of  underground 
exploration  and  sampling. 

Field  Identification  of  Soils 

Pages  1-6.1  to  1-6.5  of  the  Manual,  present  a  discussion  of  physical  properties  of 
earth  materials,  including  descriptions  necessary  for  the  identification  of  soils  of  the  sizes 
of  sand  and  finer.  The  following  notes,  submitted  as  information,  supplement  the  material 
given  and  will  assist  in  making  the  proper  identification  of  the  soil  encountered  in  test 
borings. 

Fill  is  man-made  deposits  of  natural  soils  and  waste  materials.  The  classification  of 
fills  should  be  made  to  show  the  predominating  material,  such  as  clay  fill ;  cinder  fill,  etc. 
Trouble  may  result  from  placing  a  foundation  on  fill  if  it  overlies  other  material,  hence 
care  should  be  taken  to  explore  the  underlying  soils. 

Inorganic  silt  or  rock  flour  is  a  fine  grained  inorganic  earth,  consisting  of  grains  which 
will  pass  through  a  200-mesh  sieve.  It  is  a  treacherous  soil  and  the  source  of  trouble 
as  a  foundation  material.  In  the  wet  state  it  is  often  misclassified  as  soft  clay.  When  wet, 
it  can  be  molded  or  rolled  in  the  fingers  without  breaking,  but  it  crumbles  as  it  drys 
slightly.  The  material  that  dries  on  the  hands  can  be  easily  dusted  off.  A  small  pat  of 
wet  inorganic  silt  placed  in  the  palm  of  the  hand  and  shaken  in  a  horizontal  plane  will 
become  wet  and  shiny.  When  compressed  between  the  fingers  the  water  disappears  from 
the  surface  and  the  surface  appears  dull.  If  water  does  not  appear  on  the  surface,  the 
material  is  lean  clay. 

Organic  silt  and  organic  clay  are  silts  and  clays  with  a  content  of  visible  organic  material 
or  of  organic  colloids.  These  materials  will  be  compressible,  plastic  and  pervious.  They 
are  identified  by  their  color — dark  grey  or  black.  They  often  have  a  perceptible  odor  of 
decomposition.  When  molded,  they  exhibit  a  soft  feeling,  very  different  from  the  feel  of 
inorganic  silt  or  clay. 

Sand,  Gravel  and  Boulders 

Fine  Sand  can  be  classified  as  that  of  which  the  greater  portion  will  pass  a  No.  65 
mesh  screen. 


Masonry 325 

Medium  Sand  is  that  of  which  the  greater  portion  will  pass  a  No.  28  mesh  screen 
and  be  retained  on  a  No.  65  mesh  screen. 

Coarse  Sand  will  pass  a  J4-in.  diameter  screen  and  be  retained  on  a  No.  28  mesh 
screen. 

Gravel  will  be  retained  on  a  %-m.  diameter  screen  and  its  size  ranges  to  six  or  eight 
inches. 

Small  Boulders  range  in  size  from  8  in.  to  ^  cu.  yd.  in  volume. 

Large  Boulders  are  more  than  ^  cu.  yd.  in  volume  and  may  contain  as  much  as 
15  to  20  cu.  yd. 

Compactness  of  Granular  Soils. — Compact  sand  or  gravel  requires  the  use  of  a  pick  for 
its  removal.  It  offers  considerable  resistance  to  the  progress  of  earth  boring  tools.  Loose 
sand  or  gravel  can  be  excavated  by  shoveling.  Rapid  progress  with  earth  boring  tools  is 
possible. 

Suspension  of  Granular  Soils. — Any  fine  granular  soil  the  grains  of  which  are  of  nearly 
uniform  size  may  be  subjected  to  a  flow  of  water  through  it  in  such  a  manner  as  to 
cause  each  particle  of  soil  to  be  suspended  in  the  water.  Such  a  condition  is  called 
quicksand  and  is  a  granular  phenomenon  and  not  a  type  of  soil. 

Classification  of  Clay. — Clay  may  be  classified  in  part  by  color.  Locally  the  color  classi- 
fication will  have  a  bearing  on  its  consistency  and  assist  the  designer  in  determining  its 
safe  bearing  load. 

Hard  clay  cannot  be  remolded  by  the  use  of  the  fingers  and  requires  a  pick  to 
excavate. 

Medium  clay  can  be  remolded  by  applying  considerable  pressure  with  the  fingers  and 
can  be  excavated  with  a  spade. 

Soft  clay  can  be  easily  remolded  with  the  fingers  and  can  be  readily  excavated  with 
a  shovel. 

Hardpan  is  a  compacted  mixture  of  clay,  sand  or  gravel,  difficult  to  remove  with  a 
pick  and  often  requiring  pneumatic  tools  or  explosives  for  excavation.  It  should  be 
identified  as  hardpan  and  the  description  of  the  soil  composition  should  also  be  given. 
Shale  is  highly  consolidated  clay,  the  minerals  of  which  have  been  essentially  un- 
altered since  being  deposited.  In  slate  the  original  clay  minerals  have  been  altered.  When 
water  is  added  to  shale  the  mass  will  become  plastic.  When  shale  has  been  dried  it  can 
be  easily  shattered  by  a  light  blow  or  by  hand.  In  slate  there  will  be  no  change. 
For  further  information  regarding  identification  of  Soils  see: 

Exploration  of  Soil  Conditions  and  Sampling  Operations,  by  H.  A.  Mohr, 
Second  Edition,  Feb.  1940,  Publication  No.  269,  Graduate  School  of  Engineering, 
Harvard  University. 

Description  and  Identification  of  Soil  Types,  by  P.  C.  Rutledge,  pages  124 
to  129  incl.,  Proceedings  of  Purdue  Conference  on  Soil  Mechanics  and  Its  Applica- 
tion, Purdue  University,  July  1940. 

Records 

The  importance  of  making  a  complete  record  of  all  the  information  regarding  the 
test  boring  cannot  be  too  highly  stressed.  The  boring  report  to  be  of  value  should  furnish 
the  following  information.* 

1.  The  starting  grade  of  each  boring.  The  grade  should  be  referenced  to  a 
definitely  established  datum.  This  is  just  as  important  as  is  an  established  datum 


*  From  Exploration  of  Soil  Conditions  and  Sampling  Operations,  page  S. 


326 Masonry 

plane  for  a  contour  survey.  In  many  instances  actual  construction  is  undertaken 
several  years  after  the  borings  have  been  made.  During  the  interval  the  area  might 
have  been  filled  or  it  might  have  been  leveled  off.  Then,  too,  as  is  constantly  the 
case,  years  after  the  borings  have  been  made,  alterations  or  additions  are  under- 
taken. If  the  starting  grades  are  given  with  respect  to  an  estabhshed  datum  the 
borings  are  of  permanent  value.  Otherwise  they  are  of  no  value  after  a  short 
period  of  time. 

2.  A  true  cross-section  of  the  ground  showing  the  depth  below  the  starting 
grade  to  the  top  of  each  stratum  or  the  thickness  of  each  stratum.  It  seems 
needless  to  advise  that  the  report  should  identify  the  soils  encountered  in  consecu- 
tive order  starting  at  the  surface. 

3.  The  results  plotted  to  scale  and  to  true  elevation. 

The  engineer  knows  the  type  of  the  proposed  structure,  its  weight,  the  num- 
ber of  points  of  support  and  their  spacing,  the  loads  it  will  transmit  to  the  soil 
and  the  elevation  of  the  basement  floor  or  the  lowest  elevation  of  some  controlling 
requirement.  With  these  data,  a  line  drawn  across  the  boring  report  at  the  con- 
trolhng  elevation,  will  often  give  at  a  glance  the  answer  on  the  proper  type  of 
foundation  to  use.  In  most  instances  a  few  hours'  study,  which  may  include  esti- 
mates of  the  cost  of  two  or  three  types  of  foundations,  will  determine  the  answer. 
Occasionally,  however,  a  difficult  and  interesting  problem  is  encountered  and  a 
great  deal  of  time  and  study  are  required  before  the  proper  solution  is  arrived  at. 

4.  Ground  water  level.  If  there  is  any  indication  of  an  unusual  water  con- 
dition it  should  be  noted.  The  usual  indication  of  a  porous  stratum  is  a  loss  of 
wash  water.  The  voids  in  the  porous  stratum  may  be  completely  filled  with  water 
and  the  loss  be  caused  by  a  positive  hydrostatic  head  in  a  downward  direction.  On 
the  other  hand  the  voids  may  contain  no  water  and  the  loss  of  wash  water  can 
still  be  from  the  same  cause.  If  there  is  a  question  of  the  true  condition,  the  bore 
hole  should  be  bailed  for  a  definite  answer.  Every  iota  of  evidence  pertaining  to 
water  conditions  should  be  noted  as  construction  work  below  water  level  is  the 
bane  of  a  builder's  existence. 

5.  Some  indication  of  the  compactness  of  granular  soils  and  the  degree  of 
hardness  of  plastic  soils.  To  record  "compact  sand"  or  "loose  sand"  or  "hard  clay" 
or  "soft  clay"  is  not  explicit.  Those  are  relative  terms  and  will  have  a  different 
meaning  with  different  individuals.  A  positive  resistance  basis  to  penetration  under 
an  applied  weight,  or  blows  of  a  constant  height  of  fall  of  a  given  weight,  should 
be  established  and  used. 

6.  A  proper  soil  classification  of  every  stratum  encountered.  The  practice  of 
designating  the  different  soils  by  various  types  of  cross-hatching  or  letters  or 
numbers  or  by  any  other  legend  merely  confuses  the  one  attempting  to  interpret 
the  report,  and  introduces  unnecessary  chance  for  error  in  translating  from  the 
original  report  or  notes  to  the  unreadable  and  then  back  again.  Anyone  studying 
a  boring  report  does  so  to  learn  what  the  ground  conditions  are.  This  purpose 
can  be  accomplished  easily  and  intelligently  when  the  report  shows  the  classifica- 
tion written  in  the  proper  location.  Boring  reports  should  never  be  made  or  shown 
otherwise. 

7.  Every  indication  of  the  presence  of  boulders,  rip  rap,  and  obstructions  of 
every  kind. 

8.  A  record  in  full  of  every  trial  or  uncompleted  boring  in  the  same  manner 
as  completed  borings  are  reported. 


Masonry 


327 


9.  A  plot  plan  showing  the  location  of  each  boring  referenced  to  definite 
survey  lines.  The  boring  numbers  should  be  marked  on  the  plan. 

10.  Identification  as  to  owner,  engineer  or  architect,  location,  date  and  job 
number.  The  report  should  be  filed  so  that  it  may  be  easily  located  for  future 
reference. 


TTtZ"  NO/?T/iJi.  SOam  /?/J/L/?0/7D  CO. 

Office    of    C/iief    ^n^/nser-  Chicago,  J//. 

TEST     DOPING    DATA 

3r/'c/ae/^o.  ^^74  ^    HrM        Disfr'ict      EasUm       Division 

TE3T  mole:  no,,A__ 

Station  or  M.P-f-     Sia.AC,8->-JJ° 
Rt  or  If.  of  <L 


23  s     ff_     Lt 


Bor/ngs  mads  At/    X  Y  ^-  Co. 

Inspector        l^m.  Jone.5 
Bass  of  /fhi/  r/cK    222. ''■y 


Date  started  4-a-w  Time  y/<9-^ 
Dafe  Comfikfed  4-S-4-0  f/,7}e   '^so  P 


/^(Tround  Line  £/ey.    2JO.i> 


28-^' 


J7'-0 


P^ 

CAiWcm  of 


Fine  Pii-fy  So" J         •■       ^^ 


Inside  Diam.  of  Cas/'ng 
"  "         "    Spoon 

h^eighf  of  Hammer 
Drop    of  Hommsf- 


?? 


2" 


30" 


Sa/npk 

no. 


f/r/rr  i^//ou/ 


C/a- 


4c^ 


'J 


DRY  ^/^MPU  DflTf^ 


Ele\^.of 
boft  of 
spoon 


^2 


no.  of 
hlotys 
per  f^. 


4^-3" 


/OO" 


/&'-i>" 


ZO-f 


2<9-<h' 


Tofal 
penefrotim 
of  spoon 


Le/>giHiaf 

■sample 

obfa/ned 


/&■ 


/5 


/6' 


/3- 


4-i 


S" 


Harjpan,  C/at/  f      /fS 


pisivr^el 
/.imffjfonf 


limssfone 


Tape  of  Core  Dr/'// 
Cors    Dla/77.  /o 


Ji/UA^^^.^.%^ 


goWcmaf  Tcj*  Mo/n 


RcM/iir/rs:  ^       ,    .  /  j^ 

Wifer  .dcoJ  af  /tiS' ieAi-^  yroond     !*  *oors    offer    fejt  ^oj     com/>/afe4 
t$'  af    easing    Oje<f 


CORE  D/^Tf^ 

Sonipk 

no 

Ehvaflon 

Core 
necoi^erifd 

/fafe  of  Boriiy 
ff.  psr  /foor- 

Top 

daft 

4C 

?/-/i)' 

37-0' 

2-/0  ■ 

r 

«7 

37-0 

4^-f 

^■.2- 

-^ 

•SAsef    -^       of      6 


A  Sample  Page  of  Test  Boring  Data. 


328 Masonry 

The  foreman  should  be  furnished  a  notebook  printed  especially  for  recording  his 
findings.  The  blank  spaces  to  be  filled  in  will  keep  him  from  forgetting  items  of  impor- 
tance. The  illustration  shows  a  sample  page  of  test  boring  data  as  recorded  in  such  a 
notebook. 

When  making  a  report  do  not  elaborate.  State  the  positive  facts  found.  For  in- 
stance, if  the  boring  is  stopped  abruptly  by  an  impenetrable  object,  stop  the  report  at 
the  top  of  that  object.  To  identify  it  as  bed  rock  is  an  unwarranted  assumption,  as  a 
small  boulder  in  hard  pan  will  stop  progress  with  earth  boring  tools.  The  only  way  to 
identify  such  an  object  is  to  drill  it  with  core  tools  and  reclaim  a  sample.  Any  boring 
report  definitely  identifying  material  below  the  bottom  of  the  bore  hole  should  raise 
suspicion. 

Usually,  when  a  boring  is  stopped  abruptly  and  the  work  is  not  too  deep,  efforts 
are  made  to  determine  if  a  boulder  or  ledge  rock  stopped  the  tools.  Additional  borings 
are  made  at  distances  of  four  or  five  feet  from  the  location  of  the  original  boring.  If  all 
borings  at  that  location  are  stopped  at  about  the  same  elevation,  it  is  often  assumed 
that  bed  rock  has  been  encountered.  Regardless  of  the  number  of  trials  and  the  results 
obtained,  nothing  has  been  definitely  proved  regarding  the  nature  of  the  material  that 
stopped  the  tools.  By  no  hne  of  reasoning  can  anyone  justify  a  positive  identification 
of  the  material  below  the  bottom  of  the  bore  hole. 


SPECIFICATIONS  FOR  TEST  BORINGS 
I  SCOPE 

These  specifications  cover  the  procedure  for  making  borings  through  soil  and  rock  to 
determine  their  characteristics  for  foundation  purposes. 

The  specifications  are  written  to  cover  a  variety  of  methods  of  exploration,  but 
only  those  methods  will  be  used  which  are  consistent  with  the  information  it  is  desired 
to  obtain  on  a  particular  job. 

II  GENERAL 

1.  Number  and  Location  of  Test  Holes 

The  number  and  location  of  the  test  holes  shall  be  as  indicated  upon  the  drawings. 
Additional  test  holes  may  be  required  to   delimit  erratic  soil  areas  should  radical 
soil  changes  be  disclosed  by  the  original  borings. 

2.  Plant 

All  plant,  equipment  and  methods  to  be  used  shall  be  approved  by  the  Engineer 
before  the  work  is  begun.  However,  approval  of  the  equipment  shall  not  be  construed 
as  including  approval  of  the  performance  thereof  or  that  additional  equipment  and 
methods  will  not  be  required  to  perform  the  work  satisfactorily  according  to  the 
specifications. 

3.  Depth  of  Borings 

At  locations  where  the  rock  stratum  is  at  such  a  depth  that  it  is  not  practical  to 
reach  it,  the  boring  shall  extend  below  the  proposed  foundation,  or  foot  of  piles,  to  such 
a  depth  as  will  adequately  determine  the  characteristics  of  the  underlying  materials. 

Where  the  borings  reach  rock,  all  borings  shall  be  carried  at  least  5  feet  into  solid 
rock.  If  cores  indicate  that  the  rock  is  seamed  or  broken,  or  in  thin  layers,  all  borings 
shall  be  carried  to  the  depth  considered  necessary. 


Masonry 329 

4.  Permits 

All  permits  shall  be  secured  by  the  owner  or  contractor  before  the  work  is  started 
and  as  provided  by  the  contract. 

Ill  EXPLORATION  METHODS 

1.  Test  Pits 

Where  required,  test  pits  will  be  made  to  bedrock  or  to  such  depth  as  ordered. 
Excavation  shall  be  by  hand  methods  and  excavation  materials  of  each  class  shall  be  kept 
in  separate  piles  as  far  as  practicable.  Ordinarily,  samples  of  the  formations  shall  be 
taken  progressively  from  the  natural  formation  where  requested  by  the  Engineer  and 
placed  in  quart  jars  and  properly  labeled. 

2.  Hand  Augers 

Hand  augers  may  be  used  for  test  borings  of  moderate  depth  in  plastic  materials,  in 
granular  materials  above  the  ground  water  line  or  in  granular  materials  containing  suffi- 
cient clay  to  make  them  cohesive.  The  auger  shall  be  not  less  than  2  inches  in  diameter. 
The  strata  shall  be  determined  by  the  samples  secured  when  the  auger  is  pulled  from  the 
ground. 

3.  Dry  Sample  Borings 

(a)  Casings. — Casings  for  penetrating  soil  shall  be  not  less  than  2  inches  inside 
diameter.  Casing  for  penetrating  rock  shall  be  not  less  than  2J/2  inches  inside  diameter. 
Water  may  be  used  to  facilitate  the  driving  of  the  casing. 

(b)  Procedure. — Where  required,  dry  sample  borings  will  be  made  to  bedrock  or  to 
such  a  depth  as  ordered  to  obtain  samples  suitable  for  determining  accurate  soil  profiles 
and  furnishing  material  for  certain  laboratory  tests  not  requiring  large-diameter 
undisturbed  samples. 

Dry  samples  shall  be  taken  at  every  change  of  formation,  and  in  any  case  at  inter- 
vals not  exceeding  5  feet.  Continuous  samples  may  be  required  through  thinly  stratified 
formations.  Samples  may  be  taken  with  a  solid  spoon  from  which  the  sample  may  be 
pushed  with  a  piston  or  with  a  split  spoon  where  the  formation  is  such  that  part  of  the 
sample  will  not  adhere  to  each  half  of  the  spoon  when  separated.  Core  retainers  will  be 
used  with  the  sampler  when  necessary  to  hold  the  sample. 

The  use  of  water  for  cleaning  out  the  casing  between  samples  will  generally  be 
allowed,  but  when  the  moisture  content  of  the  material  below  the  casing,  of  which  a 
sample  is  desired,  might  be  altered  by  introducing  a  head  of  water  in  the  hole,  the 
casing  must  be  cleaned  dry  by  means  of  augers,  a  drive  pipe,  or  other  method. 

(c)  Dry  Samples. — Dry  samples  of  the  material  penetrated  shall  be  at  least  1J4 
inches  in  diameter  and  obtained  by  pushing  a  sample  spoon  of  approved  design  not  less 
than  one  foot  below  the  bottom  of  the  casing  into  the  material.  If  a  sample  is  not 
obtained  the  first  time,  the  spoon  shall  be  driven  again  to  a  depth  of  two  feet  below 
the  bottom  of  the  casing.  Should  the  material  be  so  incohesive  that  the  second  driving 
of  the  spoon  fails  to  secure  a  sample,  a  spoon  with  a  flapper  valve  shall  be  driven  as 
specified  above.  Should  this  last  procedure  fail  to  secure  a  sample,  an  auger  or  sand  trap 
shall  be  used  until  the  required  sample  is  obtained.  Data  shall  be  recorded  and  samples 
marked  and  preserved  as  specified  in  Sections  IV  and  V. 

(d)  Determination  of  Grozmd  Water  Level. — Where  required  the  elevation  of  the 
ground  water  level  shall  be  accurately  determined  by  the  following  procedure,  or  equal. 
Immediately  after  taking  the  last  sample  from  the  boring,  the  casing  shall  be  pumped 
dry  and  then  withdrawn  a  vertical  distance  of  2  feet  from  the  maximum  penetration, 


330 Masonry 

and  allowed  to  stand  for  30  minutes  before  measuring  the  level  to  which  the  water  has 
risen.  If  the  water  fails  to  rise  in  the  hole  within  30  minutes  the  casing  shall  be  with- 
drawn one  foot  higher  and  allowed  to  stand  for  10  minutes.  If  the  water  fails  to  rise 
the  second  time,  and  the  casing  is  in  material  which  may  be  impervious,  the  casing  shall 
be  withdrawn  until  its  bottom  is  one  foot  higher  than  the  elevation  at  which  such 
material  was  first  encountered  and  the  hole. allowed  to  stand  for  another  10  minutes. 
If  water  still  does  not  appear  and  the  boring  has  penetrated  one  or  more  layers  of 
impervious  material  above  the  elevation  at  which  the  casing  stands,  the  casing  shall  be 
withdrawn  above  each  succeeding  impervious  strata  as  specified  above  until  the  water 
rises  in  the  hole  or  no  more  impervious  strata  are  above  the  bottom  of  the  casing. 

If  the  boring  is  located  where  the  ground  water  level  may  be  influenced  by  a  tidal 
body  of  water,  a  record  of  the  exact  stage  and  direction  of  the  tide  at  the  time  of  taking 
the  elevation  of  the  ground  water  shall  be  made. 

During  the  above  described  determination  of  ground  water  level  an  accurate  record 
shall  be  made  of  the  times  and  elevations  of  each  successive  withdrawal  of  the  casing 
and  also  of  the  elevation  to  which  water  rose  in  the  hole. 

(e)  Determination  of  Running  Sand. — At  any  time  that  sand,  coarse  or  fine,  is  en- 
countered, the  following  test  shall  be  made  to  determine  if  the  water  content  and  the 
pressure  upon  the  material  is  sufficient  to  cause  it  to  run.  Upon  striking  sand,  a  sample 
of  the  material  shall  be  obtained  by  the  dry  sample  method.  The  casing  shall  then  be 
driven  into  the  sand  2  feet  below  the  elevation  at  which  the  sand  was  encountered  and 
carefully  washed  out  to  the  bottom.  The  hole  shall  then  be  allowed  to  stand  10  min- 
utes, and  the  elevation  at  which  the  sand  then  stands  in  the  casing  measured.  The  water 
in  the  casing  then  shall  be  removed  sufficiently  to  produce  an  unbalanced  hydrostatic 
condition  at  the  bottom  of  the  casing  and  the  elevation  of  the  top  of  sand  measured. 

3.  Core    Borings 

(a)  Plant. — Drilling  into  bed  rock  shall  be  done  with  a  diamond,  shot  or  other 
approved  bit  which  will  obtain  a  core  from  the  rock  penetrated  of  not  less  than  1% 
inches  in  diameter. 

(b)  Starting  Core  Bit. — Before  starting  the  core  bit  in  the  hole,  the  chopping  bit 
shall  be  used  to  break  up  all  disintegrated  rock  and  the  casing  seated  firmly  on  hard 
rock  by  driving  and  washing  out. 

(c)  Procedure. — The  core  bit  shall  be  started  in  the  hole  and  the  hole  drilled  to  a 
depth  of  5  feet.  The  drill  shall  then  be  withdrawn,  the  core  removed,  labeled  and  stored 
as  specified  in  Article  2,  Section  V.  After  the  core  is  recovered  the  drill  shall  be  replaced 
in  the  hole,  and  another  5  feet  of  depth  drilled,  the  drill  withdrawn,  the  core  removed  as 
noted  above.  Drilling  shall  continue  in  this  manner  until  the  required  depth  has  been 
reached. 

IV  RECORDS 

The  following  data  shall  be  recorded  on  a  permanent  form. 

1.  General 

(a)  Date. 

(b)  Names  of  railroad,  engineer,  contractor  and  inspectors. 

(c)  Location  and  identifying  number  of  test  boring  and  reference  to  survey  data. 

(d)  Ground  elevation  at  hole  and  base  of  rail  elevation. 


Masonry 331 

2.  Borings — Dry  Sample 

(a)  Elevation  of  top  of  each  different  material  penetrated. 

(b)  Diameter  and  description  of  casing. 

(c)  The  elevation  of  the  bottom  of  spoon  at  start  of  driving  for  each  sample. 

(d)  The  elevation  to  which  the  spoon  was  driven. 

(e)  The  weight  and  drop  hammer  used  to  drive  the  spoon  and  number  of  blows 
required  to  drive  it  one  foot,  for  each  sample. 

(f)  The  length  of  sample  obtained. 

(g)  The  distance  from  the  bottom  of  the  spoon  to  the  lower  end  of  the  sample 
when  the  spoon  is  not  fiDed  to  the  bottom,  and  any  other  circumstances  of 
obtaining  the  sample. 

(h)  The  stratum  represented  by  the  sample. 

(i)  The  weight,  number  of  blows  and  drop  of  hammer  used  to  drive  the  casing  to 

each  successive  elevation, 
(j)  The  sou  shall  be  described  in  accordance  with  the  following  classifications: 

1.  Kind:  Top  soil,  fill,  loam,  clay,  sand,  gravel,  etc. 

2.  Color:  Light,  dark,  blue,  red,  etc. 

3.  Moisture:  Dr>-,  moist,  wet,  ver>'  wet,  etc. 

4.  Consistency:  Loose,  medium,  compact,  stiff,  etc. 
(k)  Elevation  of  groimd  water. 

(1)   Elevation  of  running  sand  and  thickness  of  strata. 

3.  Borings — Core 

(a)  Elevation  of  bottom  of  casing  when  seated  on  rock  according  to  Article  3  (b) 
Section  HI. 

(b)  T>T)e  of  core  drill,  including  size  of  core. 

(c)  Length  of  core  recovered  for  each  5-foot  length  drilled. 

(d)  Elevation  of  bottom  of  core  hole. 

(e)  Elevation  of  each  change  in  tjpe  of  rock. 

(f)  The  rock  shaU  be  described  in  accordance  with  the  following  classification: 

1.  Shale,  slate,  limestone,  sandstone,  etc. 

2.  Condition:  Broken,  fissured,  laminated,  soHd,  etc. 

3.  Hardness:   Soft,  medium,  hard,  ver>-  hard,  etc. 

(g)  Rate  at  which  each  5-foot  section  was  bored  in  feet  per  hour. 

V  SAMPLES 

1.  Dry  Samples 

All  dr\-  samples  shall  be  immediately  placed  in  suitable  air-tight,  wide-mouthed, 
clear-glass  jars  of  sufficient  size  to  hold  a  section  of  the  sample  intact.  These  jars  shaU  be 
permanently  and  clearly  labeled  to  show  the  date,  number  of  the  test  hole,  elevation  at 
which  taken,  and  kind  of  material.  These  samples  shall  be  carefully  preserved  as  a  part 
of  the  record. 

When  undisturbed  samples  are  required  for  investigation  in  a  laboratory,  e.\treme 
care  must  be  taken  in  the  recovering,  sealing  and  handling  of  such  samples  so  that  they 
are  delivered  to  the  laboratorj-  in  as  good  condition  as  when  taken. 

2.  Cores 

A  label  shall  be  placed  on  each  piece  of  core  more  than  6  inches  in  length,  stating 
the  number  of  the  hole,  the  original  length  of  the  piece  and  the  original  elevation  of  the 
top  of  the  run.  The  pieces  of  core  shall  be  placed  in  the  order  in  which  they  were 


332 Masonry 

removed  from  the  core  barrel  in  a  S-foot  narrow  box.  The  box  shall  be  securely  labeled 
showing  the  number  of  the  test  hole.  These  cores  shall  be  carefully  preserved  as  a  part 
of  the  record. 

VI  INSPECTION 

No  drilling  shall  be  done  except  in  the  presence  of  the  Engineer  or  his  Inspector. 
No  more  than  two  drilling  crews  working  in  the  same  vicinity  at  the  same  time  shall  be 
covered  by  one  inspector.  The  Inspector  shall  establish  bench  marks  for  the  determina- 
tion of  the  required  elevations,  check  the  log  of  the  boring  to  determine  that  the  infor- 
mation designated  in  Section  IV  is  being  obtained ;  and  see  that  all  soil  samples  and  cores 
are  properly  boxed  and  stored  in  a  suitable  place  or  shipped  to  the  designated  destination. 

VII  CLEANING  SITE 

After  completing  the  work,  the  casing  shall  be  withdrawn,  the  plant  and  other 
material  removed  and  all  holes  closed  as  directed  by  the  Engineer. 


Report  on  Assignment  14 
Specifications  for  Concrete  Placed  Under  Water 

T.  L.  Condron  (chairman,  subcommittee),  F.  E.  Bates,  G.  E.  Boyd,  F.  W.  Capp,  I.  L. 
Pyle,  G.  R.  Smiley,  J.  J.  Yates. 

In  its  study  of  "underwater  concrete"  or  "depositing  concrete  under  water",  your 
committee  has  gathered  a  mass  of  information  from  engineers  in  all  parts  of  the  United 
States  who  are  experienced  in  this  particular  use  of  concrete.  From  the  information 
received  and  from  the  definite  recommendations  of  these  engineers,  the  committee  has 
prepared  the  following  section  of  a  specification  for  underwater  concrete. 

Accordingly,  your  committee  recommends  that  Section  206,  Depositing  Concrete 
Under  Water,  paragraphs  1  to  6,  inclusive,  pages  8-26  and  8-27,  of  the  Specifications 
for  Portland  Cement  Concrete,  Plain  and  Reinforced,  be  withdrawn  from  the  Manual, 
and  that  the  following  Section  206 — Special  Requirements  for  Concrete  To  Be  Deposited 
Under  Water,  paragraphs  1  to  13,  inclusive,  be  adopted  as  a  substitute  therefor. 

It  is  also  recommended  that  Sections  212  and  213  be  renumbered  207  and  208,  and 
that  Sections  207,  208,  209,  210  and  211  be  renumbered  209,  210,  211,  212  and  213, 
respectively,  for  greater  clarity  and  easier  reference. 

The  method  of  "pumping  concrete"  when  deposited  under  water,  has  not  been  in- 
cluded in  the  requirements  embodied  in  the  proposed  Section  206,  as  the  committee  has 
not  obtained  sufficient  information  or  evidence  of  the  successful  and  economical  applica- 
tion of  that  method  to  warrant  specific  reference  to  it.  The  three  methods  included  in 
the  proposed  Section  206  seem  adequate  at  this  time. 

206.  SPECIAL  REQUIREMENTS  FOR  CONCRETE  TO  BE  DEPOSITED  UNDER 
WATER 

1.  General 

(a)  The  methods  specified  in  Section  204,  for  Depositing  Concrete  in  Air,  shall  be 
used  except  when  the  space  to  be  filled  with  concrete  contains  water  which  cannot  be 
removed  in  some  practical  way.  In  such  cases,  and  when  authorized  by  the  Engineer, 


Masonry 333 

concrete  shall  be  deposited  under  water  in  accordance  with  the  following  paragraphs  of 
this  section. 

(b)  The  methods,  equipment  and  materials  proposed  to  be  used,  shall  be  submitted 
first  to  the  Engineer  for  his  approval  before  the  work  is  started.  The  methods  used  shall 
be  such  as  will  prevent  the  washing  out  of  the  cement  from  the  concrete  mixture,  mini- 
mize the  segregation  of  materials  and  the  formation  of  laitance,  and  prevent  the  flow  of 
water  through  or  over  the  new  concrete  until  it  has  fully  hardened. 

2.  Capacity  of  Plant 

Sufficient  mixing,  transporting  and  placing  equipment  shall  be  provided  to  insure 
that  the  depositing  of  all  underwater  concrete  for  each  predetermined  section  or  unit  of 
the  work  to  be  done,  shall  be  continuous  until  completion. 

3.  Standard  Specifications 

The  materials,  proportions  and  methods  to  be  used  in  making  concrete  to  be  deposited 
under  water  shall  all  conform  to  the  requirements  of  the  AREA  Specifications  for 
Portland  Cement  Concrete,  Plain  and  Reinforced,  except  as  modified  or  supplemented 
by  the  following  paragraphs. 

4.  Cement 

Not  less  than  6  sacks,  or  564  pounds  of  cement  per  cubic  yard  of  concrete  shall 
be  used. 

5.  Coarse  Aggregates 

Preference  will  be  given  to  gravel  rather  than  crushed  material.  The  maximum  size 
of  aggregate  preferably  shall  be  2  inches  and  shall  not  exceed  3  inches.  The  coarse  aggre- 
gate shall  be  well  graded,  the  weight  of  the  coarse  aggregate  shall  be  not  less  than  one 
and  one-quarter,  nor  more  than  twice  that  of  the  fine  aggregate. 

6.  Mixing 

The  cement  and  aggregates  shall  be  mixed  for  a  period  of  2  minutes  with  sufficient 
water  to  produce  a  concrete  having  a  slump  of  not  less  than  6  inches  nor  more  than 
8  inches  for  concrete  placed  by  tremies,  and  not  less  than  3  inches  nor  more  than 
6  inches  for  concrete  placed  by  bottom  dump  buckets  or  for  concrete  placed  in  sacks. 

7.  Caissons,  Cofferdams  or  Forms 

Caissons,  cofferdams  or  forms  shall  be  sufficiently  tight  to  prevent  loss  of  mortar  or 
flow  of  water  through  the  space  in  which  the  concrete  is  to  be  deposited.  Pumping  will 
not  be  permitted  while  concrete  is  being  deposited,  nor  until  24  hours  thereafter. 

8.  Leveling  and  Cleaning  the  Bottom  to  Receive  Concrete 

(a)  The  surface  of  the  bottom,  whether  of  clay,  rock,  or  other  material,  shall  be 
leveled  as  directed  by  the  Engineer,  before  depositing  concrete  under  water. 

(b)  Where  the  bottom  on  which  concrete  is  to  be  deposited  under  water  is,  or  is 
likely  to  be,  covered  with  silt,  such  material  shall  be  removed  down  to  solid  material 
before  any  concrete  is  placed.  The  method  to  be  used  to  clean  the  bottom  of  silt  or 
similar  material,  shall  be  subject  to  the  approval  of  the  Engineer. 

(c)  Before  starting  to  deposit  concrete  under  water,  the  condition  of  the  bottom  shall 
be  examined  and  reported  upon  to  the  Engineer  by  a  competent  diver,  and  shall  be 
approved  by  the  Engineer. 


334 Masonry 

9.  Continuous  Work 

Concrete  shall  be  deposited  continuously  until  it  is  brought  up  to  the  required 
elevation.  While  depositing,  the  top  surface  shall  be  kept  as  nearly  level  as  possible,  and 
the  formation  of  laitance  planes  avoided. 

10.  Methods  of  Depositing 

One  of  the  following  methods  of  depositing  shall  be  used: 

(a)  Tremie. — When  concrete  is  to  be  deposited  under  vi^ater  by  means  of  a  tremie, 
the  top  section  of  the  tremie  shall  be  a  hopper  large  enough  to  hold  one  entire  batch  of 
the  mix  or  the  entire  contents  of  the  transporting  bucket,  when  one  is  used.  The  tremie 
pipe  shall  be  not  less  than  8  inches  diameter  and  shall  be  large  enough  to  allow  a  free 
flow  of  concrete  and  strong  enough  to  withstand  the  external  pressure  of  the  water  in 
which  it  is  suspended,  even  if  a  partial  vacuum  develops  inside  of  the  pipe.  Preferably 
flanged  steel  pipe  should  be  used,  of  adequate  strength  to  sustain  the  greatest  length  and 
weight  required  for  the  job.  A  separate  lifting  device  shall  be  provided  for  each  tremie 
pipe  with  its  hopper  at  the  upper  end.  Unless  the  lower  end  of  the  pipe  is  equipped  with 
an  approved  automatic  check  valve,  the  upper  end  of  the  pipe  shall  be  plugged  with  a 
wadding  of  gunnysacking  or  other  approved  material,  before  delivering  the  concrete  to 
the  tremie  pipe  through  the  hopper,  which  plug  will  be  forced  to  and  out  of  the  bottom 
end  of  the  pipe  by  filling  the  pipe  with  concrete.  It  will  be  necessary  to  slowly  raise  the 
tremie  in  order  to  cause  a  uniform  flow  of  the  concrete,  but  the  tremie  shall  not  be 
emptied  so  that  water  enters  above  the  concrete  in  the  pipe.  At  all  times  after  the 
start  of  placing  the  concrete  and  until  all  concrete  is  placed,  the  lower  end  of  the 
tremie  pipe  shall  be  below  the  top  surface  of  the  plastic  concrete.  This  will  cause  the 
concrete  to  build  up  from  below  instead  of  flowing  out  over  the  surface,  to  avoid  forma- 
tion of  laitance  layers.  If  the  charge  in  the  tremie  is  lost  while  depositing,  the  tremie 
shall  be  raised  above  the  concrete  surface,  and  unless  sealed  by  a  check  valve  it  shall 
be  replugged  at  the  top  end,  as  at  the  beginning,  before  refilling  for  depositing  concrete. 

(Note:  Experience  has  shown  that  tremie  concrete  can  be  placed  as  above  specified, 
so  that  it  will  build  up  the  flow  as  much  as  SO  feet  horizontally  from  the  discharge  end 
of  the  tremie  with  a  slope  of  less  than  3  feet  in  50  feet.) 

(b)  Bottom  Dump  Bucket. — Where  concrete  is  to  be  deposited  under  water  by 
means  of  a  bottom  dump  bucket,  the  bucket  shall  be  of  the  type  that  cannot  be  dumped 
until  after  it  has  rested,  with  its  load,  on  the  surface  upon  which  the  concrete  is  to  be 
deposited.  The  bottom  doors  shall  be  so  equipped  as  to  be  automatically  unlatched  by 
the  release  of  tension  on  the  supporting  line  or  cable  of  the  bucket,  and  the  bottom  doors 
shall  then  open  downward  and  outward  as  the  bucket  is  raised.  The  top  of  the  bucket 
shall  be  fitted  with  double,  overlapping  canvas  flaps,  or  other  approved  covers,  to  cover 
the  contained  concrete  and  to  protect  it  from  wash  when  it  enters  the  water  and  as  the 
bucket  descends  to  the  bottom.  The  bucket,  preferably  should  be  so  designed  that  the 
hinged  bottom  doors  will  operate  inside  of  a  steel  skirt,  which  skirt  will  surround  the 
bucket  while  the  bottom  doors  are  shut  and  will  extend  below  the  bucket  as  the  bottom 
doors  open  and  hence  minimize  turbulence  and  motion  while  the  concrete  is  being  de- 
posited. The  bucket  shall  be  submerged  slowly  until  it  is  completely  under  water.  The 
normal  line  speed  after  that  shall  not  exceed  200  feet  per  minute.  After  the  bucket  has 
reached  the  surface  on  which  the  concrete  is  to  be  deposited,  it  shall  be  raised  slowly 
for  the  first  6  or  8  feet  while  the  concrete  is  being  deposited. 

(c)  Placing  Sacks  of  Concrete. — Where  a  relatively  small  amount  of  concrete  is  to 
be  placed  that  does  not  warrant  the  equipment  required  for  either  tremie  or  open  bottom 
bucket  methods,  concrete  may  be  placed  under  water  in  sacks  or  bags.  In  such  case  the 


Masonry 335 

space  shall  be  filled  with  sacks  of  concrete  carefully  placed  by  hand  in  header  and 
stretcher  formation,  so  that  the  whole  mass  becomes  interlocked.  Sacks  used  for  this 
purpose  shall  be  made  of  jute  or  other  coarse  material,  free  from  deleterious  materials, 
and  shall  be  filled  about  two-thirds  full  of  concrete  and  the  sack  openings  securely  tied. 

11.  Soundings 

During  the  time  that  concrete  is  being  deposited  underwater  soundings  shall  be 
continuously  taken  to  the  surface  of  the  deposited  concrete  and  recorded.  The  surface 
of  the  deposited  concrete  shall  be  maintained  relatively  level  over  the  area  being  covered. 

12.  Removing  Laitance 

Upon  completing  a  unit  or  section  of  underwater  concrete,  any  laitance  or  silt  col- 
lecting on  the  upper  surface  of  the  same  shall  be  removed  and  the  concrete  surface 
thoroughly  cleaned,  if  additional  concrete  is  to  be  deposited  on  that  surface. 

13.  Concrete  Seals 

Under  favorable  conditions  it  will  be  possible  to  place  underwater  concrete  of  a 
limited  thickness  in  the  bottoms  of  caissons  or  cofferdams  and  so  completely  seal  the 
structures  that  after  the  concrete  has  set,  all  water  can  be  pumped  out.  In  such  cases, 
if  it  is  economical  to  do  so,  the  water  shall  be  pumped  out,  the  exposed  surfaces  cleaned 
and  the  balance  of  the  concrete  deposited  in  air. 


Report  on  Assignment  15 

Durability  of  Concrete 

L.  M.  Morris  (chairman,  subcommittee),  F.  W.  Capp,  Maurice  Coburn,  M.  L.  Johnson, 
J.  E.  KaUnka,  C.  P.  Marsh,  I.  L.  Pyle. 

Introduction 

The  purpose  of  this  report  on  the  durability  of  concrete  is  to  give  the  members  of 
the  Association  a  summary  of  the  present  status  of  knowledge  on  this  very  important 
subject. 

In  reviewing  the  literature  of  the  last  ten  years  relating  to  durability  of  concrete, 
one  cannot  but  be  impressed  with  the  enormity  of  the  subject  and  how  little  is  really 
known  definitely  and  with  finality.  This  condition,  of  course,  results  from  the  many 
variables  which  enter  into  the  production  of  good  concrete.  These  numerous  variables 
may  be  classified  under  six  main  elements:  Cement,  water,  aggregate,  time,  temperature, 
and  the  methods  of  mixing  and  placing. 

This  discussion,  necessarily,  cannot  possibly  be  complete,  but  an  effort  has  been 
made  to  summarize  some  of  the  more  important  ideas  on  the  subject  from  recent  litera- 
ture. Papers  by  McMillan,'"  Scholer,'  Carlson,"  Bates,'  Voss'  and  Young'*  have  been 
used  principally.  These  and  other  references  used  are  shown  in  the  bibliography  at  the 
end  of  the  paper. 

Your  committee  has  endeavored  (B)  to  discuss  the  various  major  factors  affecting 
durability  from  the  standpoint  of  materials  and  manufacture;  (C)  to  outline  the  prin- 
cipal defects  in  concrete  which  lead  to  disintegration;  (D)  to  consider  the  most  impor- 
tant weathering  actions  and  other  disintegrating  forces  affecting  durability;  and  (E)  to 
discuss  various  tests  for  predicting  durability. 


336 Masonry 

The  variables  involved  and  the  many  divergent  opinions  make  it  impossible  to 
express  the  relative  importance  of  the  numerous  contributing  factors,  and,  therefore,  no 
significance  should  be  attached  to  the  order  in  which  the  various  items  are  discussed. 

B.  Major  Factors  Affecting  Durability  from  the  Standpoint  of 
Materials  and  Manufacture 

The  major  factors  affecting  the  durability  of  concrete  from  the  standpoint  of 
materials  and  manufacture  can  be  outlined  very  briefly  in  three  items: 

1.  Nature  of  the  aggregates 

2.  Nature  of  the  cement 

3.  Watertightness  of  the  concrete 

1.  Nature  of  the  Aggregates 

Consideration  of  the  first  item — Nature  of  the  Aggregates — discloses  an  amazing 
number  of  conflicting  ideas,  but  from  the  mass  of  literature  several  properties  emerge 
which  form,  at  least,  bases  for  discussion:  Chemical  composition,  size,  gradation,  shape, 
surface  characteristics,  porosity,  strength,  soundness,  elastic  properties,  thermal  expan- 
sion, volume  constancy  under  wetting  and  drying,  and  specific  gravity. 

The  chemical  composition  of  the  aggregate  is  considered  important  in  that  it  either 
provides  minerals  which  are  complementary  to  the  process  of  cementation,  are  inert  to  it, 
or  detract  from  its  efficiency.  Aggregates  such  as  limestone  appear  to  aid  in  the  process 
of  cementation,  quartzes  and  dense  igneous  rocks  of  high  silica  content  are  practically 
inert,  while  some  cherts,  micas,  feldspars  and  the  like  are  thought  to  have  eventually 
deteriorating  effect  under  certain  exposure  conditions.  There  seems  to  be  some  evidence 
to  support  the  contention  that  certain  combinations  of  cement  and  aggregate  cause 
unsoundness  in  the  resulting  concrete.  Whether  this  is  due  to  some  unusual  chemical 
action  between  the  particular  materials  or  whether  due  to  other  causes,  is  not  known. 

As  to  the  maximum  size  of  aggregate,  the  evidence  seems  to  be  rather  definite  that 
.neither  very  large  nor  very  small  aggregate  is  best.  Not  only  are  the  harmful  effects  of 
bleeding  magnified  when  aggregates  are  large,  but  internal  cracking  due  to  volume 
change  is  also  worse.  A  lesser  overall  volume  change  is  found  with  the  use  of  large 
aggregates,  but  at  the  expense  of  greater  internal  stresses  and  cracking.  Thus  it  appears 
that  some  moderate  maximum  size  aggregate  is  best,  but  it  is  difficult  to  say  exactly 
what  this  size  may  be.  In  all  probability,  it  will  not  be  the  same  for  all  materials.  The 
maximum  size  of  aggregate  must  be  adapted  to  the  structure  in  which  it  is  used. 

Likewise,  there  appears  to  be  an  optimum  gradation  of  aggregate.  The  general 
result  of  most  methods  of  proportioning  aggregate  is  that  the  combined  aggregate  is 
made  as  coarse  as  possible  within  the  range  of  proper  workabiUty.  This  result  can  be 
obtained  in  several  ways.  Present  indications  are  that  the  best  gradation  is  such  that  the 
sieve  analysis  plots  as  a  smooth  curve,  but  even  this  does  not  fully  define  the  gradation. 
There  is  no  general  agreement  on  the  particular  smooth-curve  gradation  which  is  best. 
Washed  sand,  as  we  know  it  in  many  localities,  is  almost  entirely  devoid  of  fines.  This 
is  considered  to  result  in  particle  interference,  unless  excesses  of  cement  are  available. 

Particle  Shape  and  Surface  Characteristics 

The  effect  of  particle  shape  and  surface  characteristics  of  aggregate  on  durabiUty 
remains  in  the  controversial  stage.  The  shape  of  particles  undoubtedly  has  considerable 
bearing  on  the  density  of  the  mix.  It  seems  to  be  the  consensus  that  an  excess  of  thin. 


Masonry 337^ 

flat  or  elongated  pieces  will  materially  decrease  the  workability  for  a  given  water-cement 
ratio  and  hence  adversely  affect  durability.  Smooth,  rounded  particles  undoubtedly  help 
workability.  Surface  texture  may  have  a  marked  effect  on  the  strength  of  bond  with 
the  cementing  matrix.  Some  maintain  that  the  surfaces  should  be  rough.  Others  argue 
that  the  aggregate  should  have  sufficient  porosity  to  help  in  removing  excess  water  from 
the  cement  paste.  Some  view  the  problem  as  chiefly  a  matter  of  mechanical  anchorage, 
sometimes  due  to  roughness,  and  often  resulting  from  adhesion  caused  by  suction  of  the 
paste  into  the  surface  pores  of  the  aggregate.  Some  types  of  seemingly  smooth  aggregate 
may  therefore  bond  more  strongly  than  those  with  a  rougher  surface  texture.  On  the 
whole,  the  shape  and  surface  texture  of  aggregate  particles  have  a  marked  effect  upon 
the  concrete-making  properties,  particularly  with  respect  to  water,  cement  requirement 
and  workabiUty,  all  being  important  factors  from  the  standpoint  of  durabihty. 

Strength  of  aggregate  is,  of  course,  very  important  for  durable  concrete;  however, 
soundness  is  even  more  important.  Since  the  aggregates  form  nearly  three-quarters  of 
the  mass  of  hardened  concrete,  they  are  of  necessity  an  important  consideration  in  the 
production  of  durable  structures.  Aggregates  which  disintegrate  under  the  influence  of 
weathering  agencies  cannot  be  expected  to  endure  indefinitely,  even  though  protection 
be  afforded  by  a  durable  cement  paste. 

Elastic  Properties 

The  elastic  properties  of  aggregates  vary  widely  and  the  elastic  properties  of  the 
resulting  concrete  will  follow  rather  closely  the  properties  of  the  aggregate  of  which  it 
is  chiefly  composed.  The  thermal  coefficient  of  expansion  of  aggregates  Hkewise  varies 
widely,  and  again  the  chief  variable  in  concrete  as  to  its  thermal  deformations  is  found 
in  the  aggregate  rather  than  in  the  cement.  The  engineer  is  usually  in  ignorance  of 
what  particular  aggregate  will  be  used  and  he  designs  for  average  conditions.  But  it 
must  be  borne  in  mind  that  these  properties  may  constitute  very  important  factors  in 
determining  the  satisfactory  life  of  a  concrete  structure.  This  is  particularly  true  if  the 
structure,  hke  a  pavement,  requires  the  building  of  expansion  joints  to  relieve  such 
deformations.  If  adequate  provision  is  not  made,  the  resultant  high  stresses  develop  a 
type  of  failure  often  mistaken  for  material  disintegration. 

Volume  constancy  under  wetting  and  drying  is  another  important  quality  for  aggre- 
gates. Just  as  low  thermal  expansion  is  desirable  in  an  aggregate  from  the  standpoint  of 
induced  stresses,  low  volume  change  due  to  wetting  and  drying  is  important  in  reducing 
internal  stresses. 

While  specific  gravity  has  no  direct  effect  on  the  properties  of  normal  freshly  mixed 
concrete,  a  natural  or  crushed  stone  aggregate  with  a  specific  gravity  of  less  than  2.50 
should  be  investigated  thoroughly  before  it  is  used  in  concrete.  Some  of  the  adverse 
properties  often  associated  with  low  specific  gravity  are  porosity,  softness  and  high 
absorption,  any  of  which  may  lead  to  breakdown  under  weathering  action. 

2.  Nature  of  the  Cement 
If  we  are  left  with  a  feeling  of  inadequate  accurate  knowledge  by  the  preceding 
survey  of  those  properties  of  aggregates  which  result  in  durable  concrete,  we  are 
brought  up  against  an  almost  blank  wall  of  ignorance  when  we  try  to  list  those  prop- 
erties of  cement  which  will  without  question  produce  durability.  However,  from  the 
present  very  incomplete  technology  of  cement,  certain  properties  stand  out  as  bases  for 
discussion  of  this  most  essential  element  in  the  concrete  mix:  Chemical  composition, 
fineness,  cement-water  combination,  bleeding  characteristics  and  plastic  properties,  cement 
content,  strength,  soundness,  resistance  to  aggressive  waters,  volume  change  characteristics, 
and  heat  of  hydration. 


338 Masonry 

Cements  of  different  chemical  compositions,  of  course,  perform  quite  differently  as 
regards  strength  development,  heat  of  hydration  and  other  properties.  This  is  reflected  in 
the  new  ASTM  tentative  specifications  covering  five  types  of  cement:  Normal,  moderate 
heat  of  hardening,  high  early  strength,  low  heat  and  sulphate-resistant. 

The  different  properties  of  these  various  cement  compositions  probably  do  affect 
the  durabihty  of  the  resulting  concrete  to  various  degrees;  however,  there  are  few  aspects 
of  this  problem  upon  which  the  experts  agree.  It  is  now  rather  generally  accepted  that 
high  tricalcium  aluminate  in  a  cement  produces  concrete  having  lower  resistance  to  sul- 
phate waters  and  sea  water  than  cement  with  low  percentages  of  this  compound.  The 
effects  of  the  principal  compound  compositions — tricalcium  silicate,  dicalcium  silicate, 
tricalcium  aluminate  and  tetracalcium  alumino-ferrite — on  strength,  volume  change,  re- 
sistance to  freezing  and  thawing  tests,  resistance  to  sulphate  solutions,  heat  of  hydration 
and  other  properties,  are  known  to  a  considerable  degree.  A  summary  of  this  phase  of 
the  subject  can  be  found  in  the  1940  report  of  the  Masonry  committee,  AREA  Pro- 
ceedings, Vol.  41,  page  378. 

It  is  now  known  that  the  compound  compositions,  as  at  present  calculated  from  the 
oxide  analyses,  may  be  greatly  altered  by  the  heat  treatment  of  the  clinker  after  burning, 
principally  in  that  if  the  chnker  is  cooled  quickly,  a  large  percentage  of  "glass"  may  be 
formed.  At  times,  the  "glass"  thus  formed  may  constitute  the  third  in  amount,  con- 
stituent of  Portland  cement.  Unfortunately  very  little  is  yet  known  concerning  the 
influence  of  "glass"  on  cement  properties.  Uncertainty  also  remains  as  to  the  nature  of 
the  role  of  the  so-called  minor  oxides,  such  as  MgO,  Na20,  K^O,  FeO,  TiOo,  Mn203  and  PsOs, 
which  will  average  a  total  of  about  four  percent  for  the  cements  of  the  entire  country, 
but  in  some  cases  will  amount  to  six  percent. 

The  influence  of  "glass"  and  the  minor  oxides  renders  the  usual  calculation  of  com- 
pounds from  the  oxide  composition,  a  questionable  procedure;  however,  in  lieu  of  more 
adequate  tests  for  physical  properties,  this  method  serves  a  useful  purpose,  provided  it  is 
used  with  discretion. 

Properties  of  Compounds 

It  is  desirable  to  summarize  the  setting  properties  attributed  to  each  of  the  pi-incipal 
cement  compounds.  Tricalcium  aluminate  reacts  rapidly,  attaining  all  its  physical  effect  in 
about  24  hours.  Its  total  heat  of  hydration  is  approximately  200  calories  per  gram  and 
practically  all  of  this  is  evolved  in  24  hours.  The  tetracalcium  alumino-ferrite  evolves 
about  half  this  heat  and  requires  roughly  one  month  to  do  so.  The  tricalcium  siHcate  in 
about  one  month  evolves  all  its  total  heat  of  120  cal.  per  gram,  while  the  dicalcium 
silicate  has  generated  but  little  heat  at  the  end  of  7  days  and  requires  a  year  to  develop 
all  of  its  total  heat  of  approximately  60  cal.  per  gram. 

From  such  data  it  is  possible  to  estimate  roughly  the  heat  of  hydration  of  any 
cement  from  its  chemical  analysis.  For  instance,  if  the  cement  is  high  in  alumina  and 
lime  and  low  in  silica  and  iron  oxide,  it  will  contain  predominately  tricalcium  aluminate 
and  tricalcium  silicate  and  hence  will  generate  a  large  amount  of  heat. 

Likewise,  many  tests  have  been  made  to  determine  the  physical  properties  of  the 
four  main  compounds,  as  previously  mentioned.  As  a  result,  many  data  are  at  hand  for 
use  in  predicting  the  physical  characteristics  of  a  hydrated  cement  from  a  chemical 
analysis  of  the  non-hydrated  material.  From  such  data  we  know  that  tricalcium  alumi- 
nate and  tetracalcium  alumino-ferrite  develop  so  little  strength  that  the  alumina  and 
iron  oxide  may  be  ignored  in  this  respect.  Tricalcium  silicate,  and  consequently  a  high- 
lime  low-silica  cement,  attains  the  greater  part  of  its  strength  in  a  month ;  while 
dicalcium  silicate,  unless  extremely  finely  ground  and  in  the  presence  of  other  materials 


Masonry 339 

which  act  somewhat  catalytically,  at  the  same  age  has  developed  hardly  a  tenth  of  the 
strength  of  the  other  silicate.  By  the  end  of  a  year,  however,  the  strength  of  the  two 
types  of  silicates  shows  little  difference. 

While  the  previous  discussion  on  cement  and  its  compounds  bears  indirectly  on 
durability,  direct  evidence  of  relative  durability  of  the  various  types  of  cement  is  more 
limited.  In  his  Marburg  lecture  before  the  ASTM  last  June,  Bates*  said: 

Here  our  data  are  much  more  meager  than  in  the  case  of  strength  or  heat  of 
hydration.  But  they  do  show  such  a  trend  that  we  may  conclude  that  many 
of  the  commercial  cements  would  be  improved  as  to  durability  if  the  alumina  and 
iron  oxide  were  reduced  to  a  minimum  that  in  some  cases  would  cause  manufac- 
turing difficulties.  The  relative  value  of  the  two  silicates  in  respect  to  durability 
is  known  with  less  assurance.  Possibly  if  all  concrete,  regardless  of  whether  made 
of  a  high  or  low-silica  cement,  could  be  protected  for  six  months  and  ideally 
cured,  it  would  be  found  that  thereafter  the  two  silicates  would  deport  themselves 
alike  in  regard  to  permanency. 

Before  leaving  the  subject  of  cement  composition,  it  should  be  stated  that  the  use 
of  Portland-puzzolan  cement  is  increasing.  Puzzolanic  material  possesses  the  property 
of  combining  with  lime  in  the  presence  of  moisture  to  form  stable  cementitious  com- 
pounds, and  for  this  reason  it  is  claimed  to  have  a  "healing"  effect  with  the  progress  of 
time,  especially  with  the  high  lime  content  cements.  Federal  Specification  SS-C-208 
covers  cement  of  this  type. 

Fineness 

As  regards  the  fineness  of  cement,  there  are  many  varying  ideas.  The  physical 
properties  mostly  affected  by  fineness  are  time  of  set  and  strength.  Many  believe  that 
fineness  is  intimately  related  to  volume  changes  during  hardening.  Too  finely  ground 
cements  are  believed  to  require  undue  amounts  of  water  and,  consequently,  undue 
shrinkage  and  cracking  may  result.  Others  feel  that  the  coarse  particles  of  the  less  finely 
ground  material  may  hydrate  later  and  cause  disruptive  expansion.  Some  question 
whether  the  very  fine  particles  do  not  hydrate  so  promptly  during  mixing  and  placing 
that  they  confer  nothing  to  the  strength  and  may  tend  to  be  concentrated  in  any  laitance 
formed  or  on  surfaces  against  forms  where  they  rather  promptly  cause  map  cracking  or 
crazing,  or  unsightly  weathering.  R.  W.  Carlson'  reasons  as  follows: 

Regarding  the  fineness  of  cement,  there  appears  to  be  a  limit  for  best  results. 
It  was  reasoned  at  one  time  that  the  main  effect  of  finer  grinding  was  to  facilitate 
hydration.  In  other  words,  a  lean  mix  with  a  very  fine  cement  was  considered 
to  be  about  equal  to  a  richer  mix  with  a  coarser  cement.  But  recent  studies  of 
thin  sections  of  concrete  reveal  a  significant  difference  not  acknowledged  before. 
It  has  always  been  known  that  a  large  percentage  of  the  grains  of  fine  cement 
hydrate  completely.  In  the  case  of  the  coarser  cement,  the  numerous  unhydrated 
cores  of  cement  grains  become  the  solid  cores  for  the  many  little  cells  of  unstable 
hydration  products.  The  uninterrupted  dimensions  of  the  gel  appear  actually  to  be 
less  in  the  case  of  the  coarser  cement  because  of  the  stabilizing  cores.  In  concrete 
subject  to  drying,  therefore,  at  least  a  part  of  the  advantages  of  finer  grinding 
may  be  offset  by  a  greater  degree  of  internal  cracking.  The  actual  optimum  fine- 
ness of  cement  must  be  dependent  on  composition,  because  only  one  compound 
(dicalcium  siHcate)  can  be  relied  upon  not  to  hydrate  completely  under  ordinary 
conditions.  It  is  somewhat  ironical  that  a  good  cement  could  not  be  made  from 


340 Masonry 

this  compound  alone,  even  though  it  has  wonderful  long-time  cementing  ability 
and  low  heat  of  hydration.  Besides  having  insufficient  early  strength,  it  produces 
nothing  but  gel  upon  hydrating  and  therefore  it  causes  great  drying  shrinkage 
Neither  could  any  all-purpose  cement  be  made  from  any  other  one  compound  in 
Portland  cement.  Even  the  most  desirable  compounds,  the  calcium  silicates,  have 
an  optimum  proportion  one  to  the  other. 

Cement  in  combination  with  water  serves  two  functions:  To  make  the  mixture 
workable  and  to  properly  set  and  harden  the  finished  concrete.  Both  functions  are  im- 
portant and  have  a  bearing  on  durabihty.  There  seems  little  question  but  that  different 
cements  have  different  plastic  properties,  depending  somewhat  upon  fineness  of  grinding, 
possibly  chemical  composition  and  upon  other  properties  not  yet  known.  Certain  admix- 
tures such  as  some  of  the  grinding  and  plasticising  agents  (TDA,  Vinsol  resin  and  others) 
have  marked  influence  upon  the  plasticity  of  the  resultant  mixture  as  well  as  increasing 
the  resistance  to  freezing  and  thawing.  Closely  related  to  plasticity  and  workability  are 
the  bleeding  characteristics  of  a  concrete  mixture.  Different  cements  have  different  bleed- 
ing characteristics,  and  there  is  reason  to  think  that  this  is  intimately  associated  with 
the  problem  of  durability. 

Bond  Between  Mortar  and  Aggregate 

Many  concrete  failures  consist  of  loss  of  bond  between  the  mortar  and  the  coarser 
aggregate.  The  sufficiency  of  this  bond  is  apparently  in  some  way  closely  associated  with 
that  property  of  the  cement  which  gives  plasticity  to  the  mixture,  and  which  prevents 
bleeding.  On  the  other  hand,  there  is  also  reason  to  beUeve  that  the  abiHty  of  a  concrete 
mixture  to  lose  its  water  may  be  advantageous;  for  example,  in  the  use  of  absorbent 
molds  and  vacuum  concrete.  Evidently,  in  these  methods  the  evil  effects  of  bleeding, 
which  is  a  form  of  segregation,  can  be  almost  wholly,  if  not  completely,  offset  by  the 
proper  manipulation  of  the  mass  before  final  set  occurs.  An  important  difficulty  pointed 
out  by  Pearson  in  this  connection  in  a  paper  given  at  the  ASTM  1940  Symposium  on 
Cement,^''  is  that  with  concrete  mixtures  of  low  bleeding  characteristics,  the  use  of  over- 
wet  consistencies  is  not  easily  recognized  because  plainly  visible  segregation  is  not  appar- 
ent, and  yet  serious  segregation  may  occur  with  this  kind  of  a  mix  in  the  usual  placing 
and  finishing  operations. 

The  subject  of  admixtures  is  fast  becoming  very  important  in  its  prospect  for  marked 
improvement  in  the  workability  and  durability  of  concrete.  Bates  in  his' Marburg  lec- 
ture before  the  ASTM  last  June  stated,  in  effect,  that  with  cements  as  they  are  now 
produced,  there  seems  to  be  no  brighter  prospect  of  improving  these  cements  throughout 
their  entire  useful  Hfe  in  concrete  than  by  the  use  of  admixtures,  such  as  grinding  agents 
and  plasticisers,  in  their  manufacture. 

In  the  1940  symposium  of  ASTM  Committee  Cl  on  Cement,  Wagner^*  presented 
an  unpubHshed  discussion  on  this  subject,  in  effect,  as  follows: 

The  fact  that  most  of  these  agents — grinding,  wetting,  dispersing,  foaming, 
plasticising — or  what  have  you,  introduce  air  into  the  concrete  mix  has  long  been 
taken  as  prima  facie  evidence  that  the  resulting  concrete  would  be  less  durable 
than  similar  concretes  not  containing  air.  Recent  studies  in  many  laboratories 
reveal,  with  few  exceptions,  that  concretes  plasticised  with  foaming  agents  are  far 
more  durable  than  similar  unplasticised  concretes.  Probably  the  best  explanation 
of  this  very  interesting  phenomenon  yet  given  may  be  found  in  Power's  report  on 
bleeding.^^ 


Masonry 341_ 

Reduced  to  its  simplest  terms,  it  appears  that  when  concrete  is  placed  it 
immediately  proceeds  to  take  itself  apart.  Water  works  its  way  upward,  cement 
and  aggregate  settle  until  the  larger  pieces  of  aggregate  bridge  upon  one  another, 
after  which  the  cement  particles  and  finer  sand  continue  to  settle  away  from  the 
undersides  of  the  bridged  aggregate.  The  spaces  beneath  the  aggregate  from  which 
the  cement  and  fine  sand  have  settled  become  filled  with  water,  producing  the 
condition  known  as  "water  gain".  Furthermore,  some  of  the  trapped  pockets  of 
water  find  outlets  to  the  surface  and  in  rising  produce  threadlike  passages  before 
the  cement  has  time  to  set.  When  it  does  set,  the  mass  is  solidified  in  an  in- 
homogeneous  condition,  with  many  water  pockets  and  threadUke  capillaries  leading 
to  the  surface.  These  remain  as  excellent  entrance  points  for  water  and  consequent 
weathering  action  at  later  periods  in  the  Ufe  of  the  structure. 

With  a  foaming  agent  present,  however,  the  concrete  is  intermixed  with 
countless  uniformly  distributed  tiny  air  bubbles.  The  buoyant  effect  of  these 
air  bubbles  is  sufficient  to  retard  the  settling  of  the  aggregate.  These  are  present 
in  such  countless  numbers  that  they  retard  even  the  movement  of  the  sand  grains 
and  cement  particles.  Settlement  of  these  particles  is  restrained;  formation  of 
water  pockets  and  capillaries  is  reduced  or  ehminated.  The  concrete  cannot  take 
itself  apart  because  the  instant  the  tiniest  grain  of  cement  or  aggregate  starts  to 
move  it  bumps  into  an  air  bubble  and  is  halted.  The  concrete  must  remain  in  a 
homogeneous  mass  until  it  hardens. 

When  the  concrete  has  hardened  it  is  true  that  it  still  retains  the  countless 
air  bubbles  and  because  of  the  reduced  density  of  the  mass  its  strength  may  be 
somewhat  reduced.  However,  the  bubbles  are  not  interconnected  and  each  has 
a  shell  of  hardened  cement  paste.  Water  cannot  re-enter  such  concrete  with  the 
same  ease  that  it  can  re-enter  an  unplasticized  concrete.  Perhaps  the  air  bubbles 
even  serve  a  useful  purpose  of  providing  expansion  chambers  which  may  relieve 
some  of  the  pressure  of  frost  action. 

Another  view  of  this  most  important  and  live  subject  was  presented  by  Swayze  at 
this  same  symposium"*  in  relation  to  water-repellant  additions,  such  as  mineral  oils, 
animal  fats  and  oils,  and  natural  resins,  in  effect,  as  follows: 

We  believe  that  the  high  resistance  of  concrete  to  freezing  and  thawing,  when 
these  admixtures  are  present,  is  not  due  to  the  water-repellent  nature  of  the  ad- 
mixture, but  instead  to  the  influence  of  the  fat  or  resin  on  the  microstructure  of 
the  cement  gel  formed  on  hydration  of  the  cement.  We  believe  that  in  normal 
concrete  the  gel  capillaries  must  be  considerably  larger  in  size  than  with  treated 
cements.  The  presence  of  air  voids  is  not  believed  to  be  the  real  cause  of  higher 
durabihty,  but  only  an  incidental  characteristic  produced  by  the  admixtures  under 
consideration.  The  basic  reason  underlying  the  action  of  the  admixtures  in  pro- 
moting greater  resistance  apparently  is  their  effect  on  concrete  permeabiUty. 

From  considerations  of  permeability,  resisting  to  freezing  and  thawing,  and  shrink- 
age, Swayze"'  concludes  that  of  the  three  classes  of  admixtures  considered,  the  natural 
resins,  such  as  Vinsol  resin,  offer  the  greatest  promise  for  improvement  of  concrete 
durability. 

As  to  the  cement  content,  neither  very  rich  concrete  nor  lean  concrete  is  best.  Neat 
cement  disintegrates  far  more  rapidly  in  freezing  and  thawing  tests  than  does  concrete. 
And  yet,  very  lean  concretes  do  not  withstand  this  durability  test  as  well  as  do  mod- 
erately rich  concretes.  The  conclusion  appears  to  be  that  there  is  some  intermediate 
mixture  with  some  moderate  cement  content  that  is  best.  Just  as  the  inert  portions  of 


342 Masonry 

hydrated  cement  dilute  the  gel  beneficially,  so  does  sound  aggregate  beneficially  dilute 
the  cement  paste.  Unfortunately,  it  is  difficult  to  say  what  proportions  are  best  because 
we  are  not  yet  certain  about  what  constitutes  a  dependable  test  for  durability.  From 
later  discussion  we  shall  see  that  minimum  cement  content  is  desirable  from  the  stand- 
point of  shrinkage  and  heat  evolution,  but  higher  cement  content  is  ordinarily  required 
to  obtain  good  workability  with  low  water-cement  ratios.  Hence,  we  see  that  minimum 
cement  content  and  low  water-cement  ratio  are  opposing  factors  which  must  be  balanced 
in  obtaining  placeable  concrete.  This  much,  however,  can  be  said.  The  quantity  of 
cement  cannot  safely  be  reduced  below  a  certain  limit  even  though  the  strength  resulting 
from  the  leaner  mixtures  may  be  adequate  for  the  load  requirements  of  the  structure. 

In  this  connection  we  should  not  forget  that  with  present  day  cements  it  is  now 
taking  less  cement  to  produce  concrete  of  a  certain  28-day  compressive  strength  than  it 
did  with  former  cements,  with  the  result  that  durability  as  indicated  by  such  strength 
tests  is  not  the  same  today  as  then.  Therefore,  impermeability  and  durability  must 
govern  cement  content  rather  than  strength  requirements. 

Age-Strength  Relation 

The  age-strength  relation  which  a  cement  will  develop  is  very  important  from  the 
standpoint  of  durability.  While  reasonable  early  strength  is  desirable  in  most  work,  long- 
continued  strength  and  soundness  are  even  more  important.  The  discussion  given  above 
under  cement  composition  is  pertinent  in  this  connection.  For  many  years  cements  which 
satisfactorily  passed  the  usual  steam  test  were  considered  to  be  sound,  but  cases  of 
delayed  expansion  brought  the  subject  to  the  fore  again  recently  with  the  result  that  the 
autoclave  test  has  been  adopted.  It  seems  to  be  the  consensus  that  cement  which  will 
meet  the  new  tentative  autoclave  test  will  be  a  more  durable  cement. 

The  knowledge  in  regard  to  the  action  of  aggressive  waters  such  as  sulphates  and 
sea  water  is  limited.  As  previously  indicated  under  "cement  composition",  cements  of  low 
tricalcium  aluminate  content  are  considered  to  be  more  resistant  to  these  waters.  The 
newly  adopted  ASTM  tentative  specification  provides  for  a  cement  of  this  type;  how- 
ever, there  are  cases  of  higher  alumina  cements  which  have  given  good  performance 
under  exposure  to  such  sulphate  action.  Other  factors  not  yet  known  are  undoubtedly 
involved  in  this  question. 

Portland  puzzolan  cements  are  finding  considerable  favor  for  their  greater  resist- 
ance to  sulphate  action ;  however,  these  cements  vary  in  performance  depending  on  the 
particular  puzzolanic  addition  used  in  manufacture. 

There  is  considerable  evidence  that  alkalies  (NaeO  and  K2O),  averaging  about  0.75 
percent  for  cements  of  the  entire  country,  produce  a  swelling  effect  with  subsequent 
disintegration  when  used  with  aggregates  containing  certain  minerals. 

The  volume  change  characteristics  of  a  cement  due  to  changes  in  temperature, 
changes  in  moisture  content,  and  freezing  and  thawing  are  of  great  importance  in  relation 
to  durability;  however,  these  characteristics  are  so  tied  up  with  the  characteristics  of 
the  other  components  of  concrete  that  discussion  of  this  item  will  be  given  later  under 
"weathering  actions".  Suffice  it  to  say  at  this  point  that  there  is  reason  to  believe  that 
the  shrinkage  of  concrete  is  affected  by  the  cement  used.  If  the  actual  loss  of  water  and 
consequent  shrinkage  which  does  occur  should  approach  the  ultimate  which  might  occur, 
if  completely  dried  out,  variations  in  cement  might  produce  concretes  of  significantly 
different  qualities  as  regards  shrinkage  and  durability.  In  all  except  rather  unusual  con- 
ditions of  exposure,  concrete  sections  of  any  appreciable  size  will  reach  their  ultimate 
possible  shrinkage  due  to  water  loss  so  very  slowly,  that  maximum  drying  shrinkage 
will  never  occur. 


Masonry 343 

Heat  of  hydration  characteristics  were  briefly  discussed  under  "chemical  composi- 
tion". This  property  of  cement  has  assumed  great  importance  in  the  construction  of 
mass  concrete,  such  as  dams,  to  avoid  cracking.  For  this  purpose,  low  heat  and  mod- 
erate heat  of  hardening  cements  have  been  developed.  Lately  this  latter  type  of  cement 
has  come  into  use  for  other  work,  such  as  for  pavements.  Its  use  is  rapidly  expanding  and 
is  reflected  in  the  Type  II  cement  adopted  recently  by  the  ASTM  as  a  tentative  standard. 
Certain  Portland-puzzolan  cements  have  also  come  into  use  for  mass  concrete  construction. 

3.  Watertightness  of  the   Concrete 

Of  course,  many  of  the  quality  factors  for  aggregate  and  cement  already  discussed, 
have  a  definite  relation  to  watertight  concrete;  however,  under  this  heading  we  shall 
consider  mainly  the  important  role  of  the  water-cement  ratio,  the  mix,  methods  of  con- 
crete manufacture  and  strength.  Most  of  these  items  are  so  well  known  that  it  would 
seem  almost  useless  to  mention  them;  however,  it  is  safe  to  say  that  a  majority  of  our 
troubles  in  obtaining  durable  concrete  have  their  origin  in  the  neglect  of  these  funda- 
mental constructional  procedures. 

Watertightness,  as  all  students  of  the  problem  will  agree,  is  the  most  important 
requirement  for  concrete  to  meet  the  destructive  effects  of  weathering.  Concrete  behaves 
as  do  the  natural  rocks  under  exposure  to  the  various  weathering  agencies.  It  is  par- 
ticularly susceptible  to  the  freezing  and  thawing  of  entrapped  moisture  and  to  the 
solvent  action  of  percolating  water. 

Requirements  Defined 

The  requirements  for  water  tight  concrete  can  be  very  simply  stated  as  "impervious 
aggregates  incorporated  in  a  cement-water  paste  which  is  itself  impervious".  One  most 
important  property  of  the  cement-water  paste  which  we  have  not  discussed  is  the  water- 
cement  ratio.  The  effect  of  the  water  content  on  the  strength  of  concrete  is  now  uni- 
versally recognized.  The  earh'  experimental  work  of  Abrams  showing  a  fairly  definite 
relation  between  the  compressive  strength  of  plastic  concrete  and  the  water-cement  ratio, 
for  given  materials  and  conditions,  has  been  widely  confirmed.  The  influence  of  the  water 
content  on  the  watertightness  of  concrete  is  not  as  thoroughly  established  experimentally, 
but  the  relation  is  fundamental  and  various  investigations  have  shown  the  important 
effect  of  a  proper  water-cement  ratio,  proper  cement  content,  plastic  and  workable  con- 
sistency, and  thorough  curing  for  watertight  or  impermeable  concrete.  These  same  items 
have  also  been  found  to  be  of  great  importance  for  resistance  to  sulphate  waters.  For  a 
given  set  of  materials  and  conditions,  most  authorities  agree  that  the  water-cement  ratio 
is  the  most  significant  factor  affecting  the  strength,  impermeability  and  the  durability  of 
hardened  concrete. 

A  most  important  item  which  is  intimately  associated  with  water-cement  ratio  is 
that  the  concrete  must  be  plastic  and  workable.  It  is  very  important  to  have  the  proper 
amount  of  cement  paste  for  impermeable  and  workable  concrete.  Since  the  water  which 
passes  through  a  concrete  member  must  find  its  way  between  the  aggregate  particles  and 
through  the  cement  paste,  it  is  evident  that  if  the  entire  space  is  not  filled  with  paste, 
there  is  little  to  resist  the  passage  of  water.  In  order  that  the  space  between  the  aggre- 
gate particles  be  completely  filled,  it  is  essential  that  concrete  mixtures  be  of  plastic  con- 
sistency so  that  the  material  can  be  worked  readily  into  the  forms  and  completely 
incorporate  the  reinforcement. 

To  obtain  a  plastic  consistency  there  must  be  sufficient  paste  to  actually  float  the 
aggregate  particles;  otherwise  the  concrete  will  be  harsh  and  result  in  honeycombing, 
bleeding  and  laitance,  all  of  which  are  detrimental  to  durable  concrete.  Thus,  we  see 


344 Masonry 

that  the  water-cement  ratio  is  a  major  influence  on  the  watertightness  of  concrete  in  two 
important  respects;  first,  through  its  influence  on  the  imperviousness  of  the  paste,  and 
second  through  its  influence  on  workabiUty. 

Of  course,  the  design  of  the  concrete  mix  involving  not  only  the  water-cement 
ratio,  but  the  cement-aggregate  ratio,  aggregate  gradings,  maximum  aggregate  size,  etc., 
is  extremely  important,  but  evidently  cannot  be  covered  in  this  resume. 

Method  and  Time  of  Mixing 

The  method  and  time  of  mixing  have  a  most  important  bearing  on  obtaining  a 
uniform  and  workable  concrete,  and  deserve  more  attention  than  they  ordinarily  receive. 
Thorough  mixing  is  essential  to  durable  concrete.  Some  of  our  older  concrete  structures 
which  are  making  such  an  excellent  showing  as  to  durability  even  under  adverse  condi- 
tions, were  constructed  with  the  old-fashioned  method  of  ramming  and  tamping  concrete 
into  place.  The  mixture  was  neither  plastic  nor  workable  in  the  modern  sense,  but  in  the 
type  of  construction  in  which  it  was  used,  reinforcing,  forms,  and  other  details  were 
such  that  it  was  possible  to  force  the  concrete  into  position  and  compact  it  properly. 
The  result  was  a  low  water-cement  ratio,  a  minimum  of  voids,  and  a  high  degree  of 
impermeability.  The  speeding  up  of  concrete  operations,  mechanical  mixing,  spouting 
and  flowing  into  place  from  a  common  point  brought  a  whole  train  of  evils  in  their 
wake.  Much  as  the  cement  and  cement  industry  has  changed,  the  changes  in  our  methods 
of  mixing,  handling,  placing,  and  finishing  concrete  have  been  even  greater,  and  all  of 
these  are  elements  which  enter  into  the  durabiUty  of  the  resultant  concrete  structure. 

On  many  jobs  we  are  using  too  short  mixing  time;  we  are  using  methods  which 
cause  agglomerations  of  cement  and  water  in  the  mixer;  we  are  placing  concrete  in 
ways  that  cause  segregation,  that  condition  probably  more  responsible  for  concrete  dis- 
integration than  any  other  factor;  we  have  changed  to  watertight  forms  of  steel  or 
plywood  which  with  excesses  of  cement  and  water  may  accentuate  segregation;  we  are 
using  vibrators  in  ways  which  may  increase  segregation  and  thereby  vitiate  whatever 
else  may  be  advantageous  in  their  use;  and  finally  we  are  treating  newly  exposed  sur- 
faces in  such  a  way  as  to  cause  excessive  surface  strains.  Segregation  is  inherent  in  con- 
crete, inasmuch  as  a  coarse  aggregate  with  a  specific  gravity  of  about  2.65  cannot  remain 
suspended  in  a  cement-sand-water  mortar  of  about  2.2,  if  excessive  vibration  is  allowed. 
Time,  temperature  and  moisture  are  elements  which  enter  into  the  hardening  of  a 
concrete  mixture.  It  is  difficult  to  separate  the  three,  but  without  doubt,  the  proper 
relation  of  time  and  temperature  with  moisture  plays  a  primary  part  in  developing  a 
durable  concrete.  If  satisfactory  temperatures  and  curing  precautions  for  the  proper 
hydration  of  cement  are  not  maintained  for  sufficient  time  to  permit  proper  hardening, 
it  is  almost  certain  that  the  full  strength  and  durability  of  the  concrete  will  never  be 
developed. 

As  already  indicated  under  the  discussion  of  cement  strength,  the  compressive  strength 
of  concrete  can  never,  of  itself,  safely  be  taken  as  a  measure  of  impermeability  or  dura- 
biUty, for  while  it  is  true  that  for  a  given  set  of  materials  and  conditions,  the  greater 
the  strength  the  better  the  impermeability  and  watertightness,  it  is  far  from  true  that  a 
certain  degree  of  watertightness  will  exist  in  all  concretes  of  the  same  strength  regardless 
of  aggregate,  cement  content  and  other  variables. 

C.  Principal  Defects  in  Concrete  Which  Lead  to  Disintegration 

Although  the  preceding  discussion  of  the  various  factors  affecting  the  durability  of 
concrete  from  the  standpoint  of  materials  and  manufacture  has  served  to  indicate  a 
large  number  of  the  known  underlying  causes  for  concrete  disintegration,  it  will  clarify 


Masonry 345 

the  situation  if  we  list  the  principal  resultant  defects  in  concrete  which  lead  to  disinte- 
gration under  weathering  action. 

Of  course,  in  this  enumeration  of  defects  we  are  not  considering  those  most  impor- 
tant structural  items,  such  as  inadequate  provision  for  drainage,  defective  construction 
joints,  unequal  settlement  of  foundation,  or  failure  to  provide  for  volume  changes  due 
to  shrinkage  or  temperature  variables.  These  design  features  are  fundamental  and  failure 
to  make  proper  provision  may  result  in  subsequent  conditions  of  cracked  concrete  and 
percolating  water  which  will  result  in  early  disintegration  no  matter  how  good  the 
inherent  quality  of  the  concrete. 

Some  of  the  more  important  defects  or  defective  conditions  are: 

1.  Unsound  or  faulty  materials — any  of  the  components  of  the  concrete. 

2.  Segregation,  resulting  mainly  from  undersanded  or  harsh  poorly  designed 
mixes,  improper  placing,  and  overworking. 

3.  Excess  water  in  the  mix. 

4.  Water  gain  in  placement,  or  bleeding. 

5.  Laitance  at  joints  or  work  planes. 

6.  Improper  or  insufficient  curing. 

7.  Cracks  from  whatever  cause:  Structural;  improper  curing;  volume  change 
due  to  drying  shrinkage,  temperature  variations,  repeated  wetting  and  drying,  and 
freezing  and  thawing  of  entrapped  moisture.  All  cracks  from  whatever  cause  per- 
mit easy  ingress  of  water  with  subsequent  leaching,  corrosion  of  steel  and  con- 
crete, and  accelerated  disintegration  when  simultaneously  exposed  to  freezing  and 
thawing  action. 

8.  Scaling,  due  to  improper  finishing,  use  of  chlorides  in  ice  removal,  freezing 
during  construction,  bleeding,  etc. 

9.  Improper  embedment  of  reinforcement  resulting  in  corrosion  of  steel,  with 
consequent   cracking  or   spalling  of  the  surrounding  concrete. 

D.  Principal  Weathering  Actions  and  Other  Disintegrating  Forces  Affecting 
the  Durability  of  Concrete  Other  Than  Design  Loads  and  Abrasion 

Of  all  the  disintegrating  forces  to  which  concrete  is  subjected,  the  most  important, 
of  course,  is  natural  weathering  action.  Natural  weathering  forces  involve  four  principal 
actions: 

1.  Freezing  and  thawing  of  entrained  moisture. 

2.  Volume  changes  due  to  several  causes. 

3.  Solution  action  of  normal  percolating  water. 

4.  Action  of  aggressive  waters. 

In  regard  to  the  first  two  phases  of  weathering  action  R.  W.  Carlson^  has  presented 
a  very  interesting  analysis,   from  which   the  following  is   quoted: 

The  destruction  of  concrete  by  weather  is  a  type  of  fatigue  action.  Changes 
in  temperature  and  moisture  cause  alternations  of  stress  which  the  concrete  must 
be  able  to  withstand  easily  if  it  is  to  endure.  Some  parts  of  a  concrete  structure 
are  being  stressed  and  restressed  repeatedly  due  to  continued  changes  in  tempera- 
ture and  moisture.  The  following  explanation  of  the  causes  of  these  stresses  is 
admittedly  meager,  but  it  may  provide  a  suitable  background  for  later  discussions. 

Firstly,  temperature  change  causes  stress,  even  when  the  change  is  uniform 
throughout  a  body  of  concrete.  Whenever  the  temperature  changes,  the  different 
constituents   of   the   concrete   tend   to   expand   or   contract   by   different   amounts, 


346 Masonry 

causing  highly  localized  stresses  that  may  in  turn  cause  invisible,  internal  cracks. 
In  general,  cement  paste  tends  to  expand  and  contract  with  temperature  much 
more  than  does  the  aggregate.  When  the  temperature  change  is  not  uniform 
through  the  concrete,  additional  stresses  are  caused  by  one  part  of  the  concrete 
tending  to  expand  or  contract  more  than  another.  The  latter  stresses  may  be  more 
extensive  and  are  likely  to  result  in  visible  cracks. 

Change  in  moisture  content,  especially  loss  of  moisture,  readily  causes  stress 
and  cracking  in  concrete.  The  gel,  which  is  the  main  cementing  material  that 
forms  upon  hydration  of  the  cement,  tends  to  contract  greatly,  while  the  other 
constituents  tend  to  remain  more  or  less  constant  in  volume.  If  the  gradation  of 
particle  sizes  in  the  fresh  concrete  has  been  such  that  the  gel  has  formed  as  a 
very  thin  skeleton  surrounding  inert  grains  of  unhydrated  cement  and  fine  aggre- 
gate, the  gel  may  not  be  damaged  by  the  volume  change.  The  mortar  may  then 
tend  to  contract  as  a  unit.  The  contraction  of  the  mortar  is  in  turn  restrained  by 
the  larger  particles  of  aggregate  and  it  is  believed  that  the  mortar  is  generally 
cracked  between  large  particles  of  aggregate  in  concrete  which  has  been  allowed 
to  dry  in  ordinary  air.  If  the  concrete  is  well  proportioned,  however,  the  internal 
cracks  are  likely  to  be  extremely  small,  probably  less  than  one-thousandth  inch 
wide,  and  susceptible  of  being  healed  in  time.  A  few  remarks  about  this  healing 
may  be  appropriate  before  proceeding  to  the  consideration  of  other  volume 
changes.  The  possible  healing  of  fine  cracks  seems  to  justify  the  otherwise  waste- 
ful common  practice  of  using  fairly  rich  mixes  and  coarse  cement,  rather  than 
lean  mixes  and  extremely  fine  cement,  so  that  there  is  always  an  abundance  of 
unhydrated  cement  left  in  reserve.  Unfortunately,  the  unhydrated  cement  is  not 
readily  available  except  as  the  cracks  by  chance  open  up  the  grains  and  expose 
the  interiors  to  further  hydration.  The  addition  of  a  moderate  amount  of  puz- 
zolanic  silica  to  concrete  would  seem  to  be  better  than  to  depend  on  unhydrated 
cement  if  heahng  of  internal  cracks  were  to  be  a  major  consideration.  The  puz- 
zolanic  silica,  and  the  Hme  necessary  for  its  gelation,  would  always  be  available 
and  the  healing  of  cracks  would  seem  to  be  facihtated. 

A  third  major  cause  of  volume  change  is  the  freezing  of  water  in  the  pores  of 
concrete.  The  expansion  of  the  water  upon  freezing  causes  localized  expansions 
somewhat  analagous  to  the  localized  contractions  of  the  gel  upon  drying.  It  is 
believed  that  water  in  the  majority  of  pores  in  the  gel  of  good  concrete  does  not 
freeze,  because  the  pores  are  of  molecular  dimensions.  On  the  other  hand,  water 
in  large,  visible  pores  usually  drains  before  freezing  occurs  and  thus  causes  little 
damage.  The  dangerous  pores  seem  to  be  those  of  intermediate  size,  probably 
invisible,  such  as  are  abundant  in  the  gel  of  poor  concrete  and  in  many  aggregates. 
In  a  recent  series  of  freezing  and  thawing  tests  involving  a  number  of  variables, 
the  most  resistant  concrete  proved  to  be  that  which  when  mixed  contained  more 
than  10  percent  of  air  voids.  The  air  voids  were  produced  by  adding  less  than 
0.1  percent  of  a  wetting  agent  to  the  cement  before  mixing.  Attempts  were  made 
to  saturate  the  specimens  before  freezing,  and  although  it  seemed  that  the  con- 
crete was  more  nearly  saturated  than  concrete  in  service,  there  was  some  doubt 
about  the  saturation.  This  result,  therefore,  is  only  offered  to  show  that  visible 
voids  are  not  necessarily  detrimental. 

No  discussion  of  voids  in  concrete  would  be  complete  without  reference  to 
bleeding.  Undoubtedly  the  control  of  bleeding  offers  a  means  of  improving  dura- 
bility. The  pores  on  the  undersides  of  aggregate  particles  that  result  from  bleeding 
are  Hkely  to  be  of  all  sizes,  including  those  that  are  damaging.  Furthermore,  the 


Masonry 347 

lack  of  bond  to  the  undersides  of  aggregate  particles  has  other  bad  effects.  This 
subject  has  been  treated  so  well  in  the  paper  by  Powers  that  reference  is  made 
to  that  paper  rather  than  to  discuss  the  subject  fully  here. 

When  cement  hydrates,  the  calcium  siUcate  gel  that  forms,  substantially  fills 
the  spaces  originally  occupied  by  the  mixing  water.  Attempts  have  been  made 
again  and  again  to  make  sizable  specimens  of  such  gel  in  the  laboratory,  for  the 
purpose  of  measuring  their  properties.  Invariably  such  specimens  crack  exten- 
sively soon  after  being  exposed  to  ordinary  air  and  they  usually  crumble  upon 
a  single  drying.  But  hydrated  cement  is  not  all  gel.  The  gel  is  interspersed  largely 
with  grains  of  unhydrated  cement  and  crystals  of  calcium  hydroxide,  both  of  which 
are  relatively  volume  constant.  Thus,  as  a  result,  larger  specimens  of  neat  cement 
can  be  made  without  cracking,  because  the  gel  has  been  diluted  with  the  grains 
and  crystals.  The  gel  is  still  a  problem,  because,  unless  the  water-cement  ratio  is 
extremely  low  so  as  to  keep  the  gel  skeleton  Ught,  ordinary  drying  will  cause  plenty 
of  cracking  even  in  specimens  only  a  few  inches  thick. 

The  solution  action  of  normal  percolating  water  on  concrete  is  many  times  not  rec- 
ognized due  to  its  being  obscured  by  frost  action.  Water  alone  will  destroy  concrete 
through  its  solvent  action  on  certain  elements  of  the  cementitous  binder,  but  more  im- 
portant, water  is  the  medium  through  which  many  other  enemies  of  concrete  carry  on 
their  attack.  Sea  water,  sulphate-bearing  waters,  acid  waters,  and  bog  waters  are  merely 
waters  carrying  impurities  that  render  their  destructive  action  more  severe,  and  all  act 
through  the  intimate  contact  that  the  water  has  with  the  concrete  through  absorption 
into  its  pores.  The  solvent  action  of  water  is  not  confined  to  leaking  joints  or  cracks,  as 
porous  concrete  is  particularly  susceptible  to  such  action. 

The  solvent  action  of  water  is  regularly  found  wherever  concrete  has  been  in  contact 
with  soft  pure  water  for  any  length  of  time  or  where  drainage  conditions  are  such  that 
rain  water  runs  over  the  surface  of  concrete.  While  this  etching  action  is  not  serious,  it 
indicates  that  if  we  give  a  quantity  of  this  same  water  a  chance  to  penetrate  the  concrete, 
serious  impairment  may   result. 

Investigation  of  supposedly  normal  waters  that  have  proved  most  corrosive  to  con- 
crete, revealed  the  interesting  fact  that,  whereas  the  hydration  products  of  cement  are 
soluble  in  any  water,  those  that  are  most  destructive  are  relatively  pure  waters  carrying 
so  little  CaO  in  solution  that  they  are  lime-hungry,  having  an  acid  reaction  as  indicated 
by  a  hydrogen-ion  concentration  below  7. 

Effects  of  Certain  Salts 

The  addition  of  certain  salts  to  water  will  increase  its  destructive  action.  Sea  water 
and  sulphate-bearing  waters  are  the  more  important  cases,  and  in  both,  the  salts  involved 
are  principally  the  sulphates  of  magnesium,  sodium  and  calcium.  The  action  of  these 
compounds  on  the  concrete  appears  to  be  both  chemical  and  mechanical.  The  chemical 
action  is  partly  corrosive  and  partly  an  interference  with  the  normal  processes  of  hydra- 
tion, while  the  mechanical  action,  due  to  the  disruptive  effects  of  the  by-products  of  the 
chemical  reactions  forming  compounds  within  the  cementing  matrix  of  the  concrete, 
results  in  an  expansive  process  similar  to  freezing  water. 

The  foregoing  discussion  may  appear  unduly  alarming  in  regard  to  the  solution 
action  of  normal  and  aggressive  waters.  With  the  exception  of  thin  concrete  sections 
subjected  to  high  heads  of  water,  the  permeabihty  of  properly  controlled  concrete  is 
sufficiently  low  to  be  of  little  practical  concern.  It  is  the  cracks,  improperly  prepared 
constructions  joints,  porosity  and  other  imperfections  which  make  permeability  and  the 
solution  action  of  water  an  important  problem.  The  white  deposit  or  "efflorescense"  so 


348 Masonry 

commonly  seen  on  concrete  surfaces  is  the  result  of  leaching  with  subsequent  carbonation 
and  evaporation. 

It  is  clear  that  watertightness  and  low  volume  change  will  result  in  reduced  leaching 
effects.  The  use  of  sulphate-resisting  cement  such  as  the  tentative  specification  recently 
adopted  by  the  ASTM,  will  materially  reduce  the  corrosion  of  concrete  by  alkali  waters. 
Attention  has  been  lately  directed  toward  "Portland-puzzolan"  cements  as  effective  in 
producing  concrete  with  improved  resistance  to  sulphate  and  acid  waters. 

Aside  from  the  natural  weathering  forces  discussed  above,  there  are  several  other 
important  disintegrating  actions  which  should  be  mentioned,  such  as  the  delayed  expan- 
sion of  unsound  materials,  corrosion  of  embedded  steel,  exposure  to  chemical  wastes, 
corrosive  atmosphere  of  certain  industries,  dehydration  in  stacks  and  fire  hazard.  Some 
of  the  factors  involved  in  these  various  deteriorating  forces  have  been  covered  previ- 
ously in  this  report,  while  others  are  of  so  specialized  a  nature  that  it  is  not  considered 
desirable  to  discuss  them  further  in  this  summary. 

Exposure  Conditions  Vary 

One  important  aspect  in  connection  with  weathering  action  which  we  are  prone  to 
forget  is  the  extreme  variation  in  exposure  to  which  different  structures  may  be  subjected. 
Two  structures  otherwise  identical  and  located  not  far  apart  may  be  showing  radically 
different  degrees  of  deterioration  due  to  the  fact  that  one  is  so  located  with  respect  to 
the  terrain  that  it  is  continually  subjected  to  the  action  of  water  seepage,  while  in  the 
case  of  the  other  structure  the  drainage  is  such  that  the  concrete  has  never  been  subjected 
to  this  condition.  In  fact,  conditions  of  exposure  can  vary  widely  even  in  the  same 
structure  due  mainly  to  differences  in  drainage  and  the  action  of  percolating  water. 

We  are  all,  of  course,  cognizant  of  the  varying  exposure  conditions  throughout  the 
country  due  to  temperature  variations.  In  this  connection  it  should  be  remembered  that 
while  concrete,  when  saturated  with  water,  may  resist  one  freezing  or  several,  yet  the 
continued  repetition  of  this  action  will  in  time  destroy  it.  Further,  only  a  few  degrees 
of  frost  are  required  to  cause  freezing  of  the  contained  moisture  in  the  surface  layer.  It 
would  seem,  therefore,  that  the  effects  of  frost  should  be  more  severe  in  those  sections  of 
the  country  that  have  the  greatest  number  of  alternate  freezings  and  thawings,  and 
while  this  is  not  subject  to  statistical  proof,  it  seems  to  be  borne  out  in  a  general  way  by 
observation.  It  certainly  is  a  fact  that  as  soon  as  one  enters  those  sections  having  more 
than  a  few  annual  frosts,  the  evidence  of  frost  action  is  almost  as  common  as  in  districts 
further  north. 

E.  Tests  for  Predicting  Durability 

In  view  of  the  many  variables  involved  in  the  production  of  good  concrete,  the 
engineer  has  been  led  to  develop  various  tests  in  an  effort  to  predict  durability  under 
different  conditions  of  exposure.  As  already  indicated,  it  does  not  seem  that  a  simple  and 
reliable  procedure  for  testing  concrete  for  durability  has  yet  been  found. 

A  brief  resume  of  the  principal  tests  which  have  been  suggested  and  used  for  pre- 
dicting durability,  both  for  hardened  concrete  and  for  its  component  parts,  is  given  below: 

1.  Accelerated  Freezing  and  Thawing 

There  seems  to  be  fair  agreement  among  engineers  that  some  type  of  accelerated 
freezing  and  thawing  test  constitutes  probably  the  most  dependable  criterion  for  dura- 
bility. However,  there  is  as  yet  no  general  agreement  on  test  methods.  An  analysis  of 
freezing  and  thawing  tests  in  comparison  with  varying  exposure  conditions  develops  so 
many  variables  that  engineers  have  been  hesitant  in  setting  up  standard  test  procedures 


Masonry 349 

until  research  is  more  complete  on  the  subject.  Space  permits  naming  only  a  few  of  these 
variables:  Degree  of  water  saturation,  effect  of  previous  drying,  velocity  of  cooling,  type 
and  size  of  specimen,  freezing  temperature,  duration  of  cold,  and  manner  of  thawing. 
The  ASTM  has  a  specification  (C4-24)  covering  a  freezing  and  thawing  test  method  for 
drain  tile.  In  1938  ASTM  adopted  a  tentative  method  (C137-38T)  for  soundness  of 
aggregates  by  freezing  and  thawing,  and  in  1939  a  freezing  and  thawing  test  (C67-39T) 
for  brick  was  adopted  as  tentative. 

In  measuring  the  results  of  freezing  and  thawing  tests,  various  methods  have  been 
used,  such  as  mere  visual  examination,  loss  in  weight,  and  decrease  in  strength.  Lately, 
certain  experimenters  have  found  flexural  strength  tests  to  be  more  indicative  of  deteriora- 
tion than  compressive  strength  tests.  All  such  strength  test  procedures,  however,  require 
a  large  number  of  specimens.  Another  method  which  seems  to  offer  promise,  but  which 
is,  as  yet,  in  the  experimental  stage,  is  the  use  of  sonic  vibration  in  predicting  change  in 
modulus  of  elasticity  and  theVeby  the  degree  of  deterioration  of  the  specimen  being  tested. 

From  the  present  state  of  knowledge,  it  would  appear  that  some  procedure  of 
freezing  and  thawing,  combined  with  cycles  of  wetting  and  drying,  and  possibly  cycles 
of  heating  and  cooling  above  average  outside  temperatures,  will  constitute  a  reasonable 
solution  of  this  problem.  However,  it  appears  self-evident  that  no  one  test  procedure 
could  possibly  be  indicative  of  the  many  varied  conditions  of  natural  weathering  ex- 
posure. A  great  amount  of  research  work  is  in  progress  on  this  important  subject  and  it 
is  hoped  that  some  reasonably  reliable  and  simplified  procedure  may  result  from  these 
efforts. 

2.  Sodium  Sulphate  and  Magnesium  Sulphate  Tests  for  Soundness  of 

Aggregates 

The  ASTM  has  a  tentative  specification  (C88-39T)  which  has  been  the  basis  for 
most  salt  crystallization  testing  for  several  years.  The  disruptive  salt  crystallization  tests 
have  been  used  in  this  country  as  an  accelerated  measure  of  resistance  to  freezing  and 
thawing  and  not  as  an  indication  of  the  resistance  to  actual  salt  crystallization  action 
as  occasioned  near  the  surfaces  of  exposed  concrete  due  to  percolating  solutions.  The  use 
of  this  test  in  this  country  on  other  kinds  of  structural  products  seems  to  have  had  as 
its  object  the  latter  purpose  in  many  cases  rather  than  a  simulation  of  freezing  and 
thawing  action.  Likewise,  English  and  Continental  investigators  have  stressed  these  tests 
from  the  latter  standpoint.  Relatively  little  attention  is  apparently  paid  to  salt  crystal- 
hzation  as  a  natural  agency  of  disintegration  in  freezing  climates,  although  the  Bureau  of 
Reclamation  emphasizes  this  action  in  its  Concrete  Manual.^' 

The  evidence  is  rather  clear  that  these  tests  detect  obviously  unsound  particles  of 
the  nature  of  those  which  cause  pitting  in  concrete  surfaces,  such  as  shales,  ochers,  soft 
sandstones,  "water-lime",  certain  argillaceous  sandstones  and  Hmestones,  certain  cherts, 
etc.  However,  it  is  also  recognized  that  these  tests  may  cause  the  disintegration  of  cer- 
tain sedimentary  rocks,  particularly  those  having  fairly  high  absorption,  which  have 
shown  good  service  in  concrete.  The  sodium  sulphate  test  has  been  in  use  for  many 
years,  while  the  magnesium  sulphate  test  has  recently  found  favor  with  various  experi- 
menters due  to  its  lesser  sensitivity  to  temperature  change  and  greater  severity  of  attack. 
There  does  not  seem  to  be  any  consistent  agreement  between  various  authorities  as  to 
the  existence  of  definite  relationships  between  the  two  sulphate  tests  and  accelerated 
freezing  and  thawing  tests.  The  conclusion  seems  to  be  that  these  salt  tests  are  useful 
in  detecting  unsound  aggregates,  but  the  results  have  to  be  interpreted  with  discretion, 
giving  due  weight  to  actual  experience  with  similar  aggregates  in  concrete  structures. 
Most  aggregate  specifications  incorporate  clauses  to  this  effect. 


350 Masonry __^ 

3.  Steam  and  Autoclave  Test  for  Soundness  of  Cement 

As  previously  mentioned  the  ASTM  has  adopted  the  autoclave  test  in  its  new 
tentative  specifications  for  Portland  cement.  The  older  steam  test  is  considered  as  satis- 
factory for  detecting  free  lime  which  is  not  in  the  hard-burned  state,  but  it  will  not 
detect  hard-burned  free  lime  or  crystalline  magnesia,  to  which  constituents  most  authori- 
ties attribute  delayed  expansion  of  some  concrete  structures.  The  more  severe  autoclave 
test  will  detect  these  two  constituents  and  for  that  reason  is  favored  as  providing  a 
more  durable  cement. 

4.  Permeability  Tests 

PermeabiUty  tests  of  concrete  have  been  used  in  various  research  projects  with 
specimens  made  up  in  the  form  of  a  bomb  or  disk,  and  the  quantity  of  input  or  output 
water  measured.  Such  methods  would  seem  from  theoretical  considerations  to  give  a  reli- 
able indication  of  probable  durability ;  however,  examinations  of  existing  structures  and 
data  from  permeability  tests  are  not  so  convincing.  Most  of  the  evidence  of  lack  of  ade- 
quate watertightness  in  most  structures  seems  to  indicate  that  the  distress  shown  has  been 
largely  due  to  segregation  in  handhng  and  placing  rather  than  to  a  fundamental  defect 
in  the  mix.  Tests  of  any  properly  cured  concrete  which  was  so  designed  that  a  plastic 
workable  mix  was  secured,  show  very  little  permeability  even  under  high  pressures. 
Based  on  these  results  it  is  questionable  whether  this  type  of  permeability  test  is  of 
such  significance  as  to  justify  its  inclusion  in  a  general  concrete  specification. 

5.  Simulated  Aggressive  Water  Tests 

Many  research  projects  have  been  made  which  included  the  performance  of  mortar 
and  concrete  specimens  under  the  simulated  action  of  various  aggressive  waters,  such  as 
sulphate,  acid  and  sea  waters.  However,  no  general  specification  covering  these  proce- 
dures has  been  adopted.  There  is  little  doubt  that  this  type  of  test,  if  properly  conducted, 
is  very  effective  in  predicting  the  durability  of  concrete  under  the  action  of  the  particular 
aggressive  water  used. 

6.  Water  Absorption 

This  is  an  old  test  which  has  been  used  for  many  years  on  various  masonry  and 
other  materials.  The  test  is  generally  made  at  normal  temperatures,  but  sometimes  it  is 
made  in  boiling  water.  The  ASTM  has  test  methods  covering  water  absorption  tests  on 
various  concrete  products  such  as  drain  tile,  pipe,  masonry  units  and  brick. 

The  absorption  test  is  considered  to  indicate  the  general  durability  of  concrete  with 
reference  to  weathering  action.  If  water  does  not  readily  enter  the  pore  spaces  of  a 
concrete,  it  will,  in  general,  be  less  affected  by  freezing  and  thawing,  the  possibility  of 
percolating  or  aggressive  water  action  is  much  reduced,  and  volume  change  due  to 
variations  in  water  content  is  decreased. 

7.  Fire  Tests 

The  methods  of  determining  fire  resistance  as  described  in  ASTM  Specifications 
C 19-33  are  applicable  to  concrete  and  are  beheved  to  be  dependable  for  concrete  as  a 
material.  They  are  not  readily  adaptable  for  studying  particular  samples  of  concrete, 
but  are  adapted  to  testing  specific  portions  of  a  structure  such  as  columns,  beams  or 
walls  which  may  be  built  of  the  concrete  to  be  tested. 

8.  Strength 

The  fact  that  strength  has  been  mentioned  last  does  not  mean  that  it  is  not  im- 
portant; however,  many  engineers  feel  that  in  recent  years  too  much  importance  may 


Masonry 351 

have  been  attached  to  early  strength  and  too  little  thought  given  to  long-continued 
strength  or  durability. 

While  the  preceding  tests  are  the  principal  ones  used  to  date  in  attempting  to  pre- 
dict durability  of  concrete  or  concrete  materials,  several  other  tests  have  been  proposed 
and  used  by  various  investigators.  Some  of  the  more  prominent  of  these  methods  are: 

1.  Heat  tests,  involving  alternate  heating  and  cooling  of  concrete  specimens, 
sometimes  combined  with  alternate  wetting  and  drying.  This  type  of  test  has 
never  gone  any  farther  than  the  research  stage. 

2.  Sugar  solubility  test  on  Portland  cement  to  detect  underburned  and  pre- 
hydrated  cements,  as  proposed  by  the  late  Thaddeus  Merriman.^  This  test  has 
received  only  limited  acceptance.  Merriman  believed  it  to  be  indicative  of  a 
cement  which  would  give  durable  hydration  products. 

3.  Sodium  sulphate  test  on  Portland  cement,  made  on  slabs  of  neat  cement, 
to  determine  sulphate  resistance.  This  test  was  used  by  Merriman,  but  has  attained 
only  limited  acceptance. 

4.  Water,  or  "floe"  test,  on  Portland  cement,  proposed  by  Ira  Paul.*  This 
test  has  as  yet  received  little  acceptance.  It  gives  very  different  results  on  different 
cements,  which  is  believed  to  have  some  connection  with  durability. 

5.  The  autoclave  test  on  Portland  cement  chnker,  recently  proposed  by  Paul. 

This  test  is  considered  to  have  possibilities. 

F.  Conclusion 

The  committee  desires  to  warn  against  undue  alarm  at  the  foregoing  enumeration 
of  the  many  ills  to  which  concrete  may  be  heir  under  various  exposure  conditions.  Our 
purpose  is  to  widen  the  appreciation  of  concrete  technology  and  thereby  hasten  the  day 
when  all  concerned  will  give  proper  attention  to  those  precautions  which  are  necessary 
in  securing  durable  concrete.  When  we  consider  the  various  unfavorable  conditions  under 
which  many  of  our  concrete  structures  have  been  completed  in  years  past,  we  must  agree 
with  Bates*  by  paraphrasing  the  closing  remarks  of  his  Marburg  lecture  last  June  in 
regard  to  the  many  uncertainties  still  remaining  as  to  the  true  nature  of  Portland  cement, 
by  saying  that  the  many  uncertainties  still  remaining  regarding  the  production  of  durable 
concrete  in  no  way  detract  from  the  proved  findings  of  its  tremendous  use  and  that  "the 
results  are  startlingly  satisfactory". 

Lacking  any  generally  accepted  test  for  predicting  durability  of  concrete,  it  behooves 
the  engineer  and  constructor  to  make  full  use  of  proved  methods  for  producing  durable 
concrete  as  given  in  various  authoritative  publications,  probably  the  latest  one  of  which 
is  the  Joint  Committee  Report  on  Concrete  and  Reinforced  Concrete,  published  in  June, 
1940.'^ 

To  indicate  only  the  high  points  in  this  procedure: 

1.  Use  materials — cement  and  aggregates — which  by  test  and  experience  have 
proved  durable  under  the  expected  exposure  conditions. 

2.  Select  a  water-cement  ratio  which  will  give  a  paste  of  a  high  degree  of 
impermeability  and  resistance  to  expected  exposure. 

3.  Use  such  proportions  as  will  produce  a  plastic  and  workable  mixture. 

4.  Mix  and  place  the  concrete  in  a  manner  to  insure  a  homogeneous  mass 
without  segregation. 

5.  Provide  thorough  curing. 


352  Masonry 


Bibliography 

1.  McMillan,  F.  R.,  The  Factors  Affecting  the  Durability  of  Concrete,  Portland  Cement 

Association  pamphlet,  published  in  1928. 

2.  Scholer,  C.  H.,  Studying  the  Durability  of  Concrete,  Journal  ACI,  May-June,  1936. 

3.  Carlson,  R.  W.,  Remarks  on  Durability  of  Concrete,  Journal  ACI,  April,  1939. 

4.  Bates,  P.  H.,  Portland  Cement,  Theories  (Proven  and  Otherwise)   and  Specifications, 

Marburg  Lecture,  Proc,  ASTM,  1940,  pp.  469-500. 

5.  Voss,  W.  C,  The  Microstructure  of  Concrete  vs.  Strength,  Pit  and  Quarry,  January, 

1939. 

6.  McMillan,  F.  R.,  Study  of  Defective  Concrete,  Journal  ACI,  May,  1931. 

7.  Young,  R.  B.,  More  Lessons  from  Concrete  Structures  in  Service,  Journal  ACI,  May, 

1931. 

8.  Young,  R.  B.,  Frost  Resistance  Concrete,  Journal  ACI,  April,  1940. 

9.  Hirschthal,  M.,  Maintenance  and   Repair  of   Concrete  Structures  in  Railroad   Con- 

struction, Journal  ACI,  Jan.-Feb.,  1937. 

10.  Mattimore,  H.  S.  and  Rahn,  G.  A.,  Research  on  Concrete  Disintegration,  Proc.  ASTM, 

1935,   Part   II,   page  410. 

11.  Marshall,    S.    W.,    Durability    of    Pavement    Concrete — Experience    in    Pennsylvania, 

Journal  ACI,  April,  1939. 

12.  Welden,  E.  C,  Durability  of  Pavement  Concrete — Experience  in  Connecticut,  Journal 

ACI,  April,  1939. 

13.  Lawton,  E.  C,  Durabihty  of  Concrete  Pavement — Experiences  in  New  York  State, 

Journal  ACI,  June,  1939. 

14.  Tremper,  B.,  The  Effect  of  Acid  Waters  on  Concrete,  Journal  ACI,  Sept.,  1931. 

15.  Stanton,  T.  E.  and  Meder,  L.  C,  Resistance  of  Cements  to  Attack  by  Sea  Water  and 

Alkali  Soils,  Journal  ACI,  Mar.-Apr.,  1938. 

16.  Tuthill,  L.  H.,  Resistance  of  Cement  to  the  Corrosive  Action  of  Sodium   Sulphate 

Solutions,  Journal  ACI,  Nov.-Dec,  1936. 

17.  Lyse,   Inge,   Effect    of    Brand   and   Type    of    Cement   on   Strength   and    Durability, 

Journal  ACI,  Jan.-Feb.,  1935. 

18.  Snader,  D.  L.  and  Various  Railroad  Bridge  Engineers,  "How  Permanent  is  Concrete", 

Railway  Age,  July  17,  1937  and  Sept.  18,  1937. 

19.  Blanks,  R.  F.,  Vidal,  E.  N.,  Price,  W.  H.  and  Russell,  F.  M.,  The  Properties  of 

Concrete  Mixes,  Journal  ACI,  April,  1940. 

20.  Davis,  R.  E.,  Kelly,  J.  W.,  Troxell,  G.  E.  and  Davis,  H.  E.,  Properties  of  Mortars 

and   Concretes   Containing   Portland-Puzzolan   Cements,   Journal   ACI,   Sept.-Oct., 
1935. 

21.  Carlson,  R.  W.,  Drying  Shrinkage  as  Affected  by  Many  Factors,  Proc,  ASTM,  1938, 

Part  II,  page  419. 

22.  Willis,  T.  F.,  and  De  Reus,  M.  E.,  Thermal  Volume  Change  and  Elasticity  of  Aggre- 

gates and  their  Effect  on  Concrete,  Proc,  ASTM,  1939,  page  919. 

23.  Powers,   T.    C,   The    Bleeding    of   Portland    Cement    Paste,    Mortar   and    Concrete, 

Journal  ACI,  1939. 

24.  Symposium   on   Cement,   ASTM,   Committee   C-1   on   Cement,  held   at  Washington, 

D.  C,  March,  1940.  (Unpublished  Papers). 

25.  Report  on  Significance  of  Tests  of  Concrete  and  Concrete  Aggregates,  ASTM,  Separate 

Pamphlet,  Committee  C-9,  1935. 

26.  Symposium  on  Weathering  Characteristics  of  Masonry  Materials,  Proc,  ASTM,  1931, 

Part  II,  page  715. 

27.  Concrete  Manual,  Bureau  of  Reclamation,  U.  S.  Dept.  of  Interior,  published  March, 

1939. 

28.  Joint  Committee  Report  on  Standard  Specifications  and  Recommended  Practice  for 

Concrete  and  Reinforced  Concrete,  AREA  Proc.  1941,  Vol.  42,  page  27.  (Bulletin 
419,  Sept.-Oct.,  1940) 


Report  of  Special  Committee  on  Waterproofing 
of  Railway  Structures 

J.  A.  Lahmer,  Chairman,  J.  P.  Gallagher  F.  P.  Turner 

F.  E.  Bates  A.  C.  Irwin  L.  W.  Walter 

G.  E.  Boyd  L.  H.  Latfoley  H.  T.  Welty 
C.  H.  Chapin  F.  J.  Pitcher  C.  A.  Whipple 
A.  C.  Copland  G.  E.  Robinson  O.  G.  Wilbur 

Committee 

To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 
1.  Revision  of  Manual. 
Change  heading  of  Section  203  to  read: 

203.  Asphalt  for  Saturant  and  Mopping  Below  Ground 

Add  following  paragraph  immediately  below  heading  of  Section   203: 
Asphalt  for  saturant  below  ground  shall  meet  the  requirements  of  Section  202. 
Change  first  paragraph  of  Section  207  to  read: 

1.  Fabric  shall  consist  of  high-grade  cotton  cloth  saturated  thoroughly  and  uni- 
formly with  asphalt  specified  in  Section  202  or  either  type  of  coal  tar  pitch  specified  in 
Section   204. 

These  revisions  do  not  change  the  meaning  of  the  specifications  and  are  recom- 
mended for  the  purpose  of  avoiding  ambiguity. 

2.  Waterproofing  of  railway  structures. 

A  study  is  being  made  of  the  Specifications  for  Woven  Cotton  Fabrics  Saturated 
with  Bituminous  Substances  for  Use  in  Waterproofing,  ASTM  Designation  D  173-40T, 
and  of  the  Specifications  for  Coal-Tar  Pitch  for  Roofing,  Dampproofing  and  Water- 
proofing, ASTM  Designation  D  4SO-38T,  in  comparison  with  AREA  specifications  and 
it  is  probable  that  agreement  will  be  reached  after  additional  information  is  received  with 
reference  to  certain  requirements. 

Progress  has  been  made  toward  harmonizing  differences  between  ASTM  Specifica- 
tions for  Asphalt  for  Dampproofing  and  Waterproofing,  ASTM  Designation  D  449-3 7T 
and  corresponding  requirements  in  AREA  Specifications  for  Membrane  Waterproofing. 
Two  of  the  larger  oil  companies  have  informed  your  committee  that  they  are  prepared 
to  furnish  waterproofing  asphalt  which  will  meet  all  requirements  of  AREA  specifications. 
The  ASTM  committee  on  bituminous  waterproofing  and  roofing  materials  has  indicated 
that  during  the  coming  year  it  will  endeavor  to  obtain  cooperation  of  the  Federal 
Specifications  Board,  the  American  Association  of  State  Highway  Officials  and  the  AREA 
in  an  effort  to  adopt  uniform  specifications  for  waterproofing  materials. 

The  Special  Committee  on  Waterproofing  of 
Railway  Structures, 

J.  A.  Lahmer,  Chairman. 


Bulletin  422,  January,  1941. 

353 


Report  of  Committee  15 — Iron  and  Steel  Structures 


R.  A.  Van  Ness,  Chairman, 
James  Aston 

F.  E.  Bates 
R.  N.  Brodie 

A.  W.  Carpenter 
C.  H.  Chapjn 
O.  F.  Dalstrom 
R.  P.  Davis 
R.  L.  Eason 
Herbert  Ensz 
W.  G.  Grove 

G.  A.  Haggander 
F.  S.  Hales 
Shortridge  Hardesty 
C.  S.  Heritage* 
Otis  E.  Hovey 


j.  b.  hunley 
Jonathan  Jones 
A.  R.  Ketterson 

A.  M.  KNOVi'LES 

B.  R.  Lefeler 
H.  S.  Loeffler 
F.  M.  Masters 

C.  H.  Mercer 
C.  T.  Morris 
O.  K.  Peck 

F.  J.  Pitcher 
Albert  Reichmann 

0.  E.  Selby 
T.  C.  Shedd 

1.  L.  Simmons 
C.  E.  Sloan 


J.  E.  Bernhardt,  Vice- 

Chairman, 
G.  L.  St ale Y 
H.  C.  Tammen 
G.  H.  Tinker 
G.  H.  Trout 
F.  E.  Turneaure 
F.  P.  Turner 
T.  M.  von  Sprecken 
C.  E.  Webb 
E.  Weidemann 
H.  T.  Welty 
C.  D.  Williams 
A.  R.  Wilson 
W.  M.  Wilson 

Committee 


Died  August  31,  1940. 


To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 

Report  on  revision  of  Specifications  for  Steel  Railway  Bridges  and  of  Rules  for 
Rating  Existing  Iron  and  Steel  Bridges  page  356 

Report  on  Instructions  for  Maintenance  Inspection  of  Steel  Bridges,  with  recom- 
mendation for  inclusion  in  the  Manual  page  358 

2.  Specifications  for  fusion  welding  and  gas  cutting  for  steel  structures,  collaborating 
with  ASTM  Committee  A-1  on  Steel,  and  the  American  Welding  Society  Conference 
Committee  on  Bridges. 

No  report. 

3.  Non-ballast  type  metal-floor  steel  bridges. 

Final  report,  submitted  as  information   page  363 

4.  Design  of  expansion  joints  involving  iron  and  steel  structures. 
No  report. 

5.  Relation  between  fatigue  of  metal  and  bridge  design. 
No  report. 

6.  Review  specifications  for  overhead  highway  bridges  of  American  Association  of 
State  Highway  Officials  insofar  as  they  relate  to  steel  construction,  conferring  with  that 
association. 

No  report. 

7.  Progress  in  design  of  bridge  details. 
No  report. 

8.  Rigid  frame  design. 
No  report. 

The  Committee  on  Iron  and  Steel  Structures, 

R.  A.  Van  Ness,  Chairman. 


Bulletin  422,  January,  1941. 


3SS 


356  Iron   and    Steel    Structures 


Report  on  Assignment  1 
Revision  of  Manual 

O.  E.  Selby  (chairman,  subcommittee),  R.  N.  Brodie,  O.  F.  Dalstrom,  Herbert  Ensz, 
Shortridge  Hardesty,  O.  K.  Peck,  G.  H.  Trout,  F.  E.  Turneaure,  C.  E.  Webb,  H.  T. 
Welty. 

The  following  revisions  of  the  Specifications  for  Steel  Railway  Bridges  are 
recommended: 

301   (b)  p.  15-10 

Delete  the  words  "shoes  and  pedestals"  in  the  first  line. 

425  p.  15-15 

Add  a  paragraph  to  read: 

For  stringers,  the  gage  of  the  outstanding  legs  of  the  connection  angles  over  the  top 

one-third  of  the  stringer  depth  shall  be  not  less  than  the  quantity  j/  — 

L  rr:  length  of  stringer  span,  in  feet 
t  =  thickness  of  angle,  in  inches 

432  p.  15-16 

Revise  to  read: 

Stiffeners  at  Points  of  Bearing 

432.  There  shall  be  stiffeners  at  the  points  of  bearing  of  plate  girders  and  at  the 
points  of  bearing  of  concentrated  loads  on  the  girders. 

There  shall  be  stiffeners  at  the  corresponding  points  of  rolled  beams  if  the  reaction 
or  the  concentrated  load,  as  the  case  may  be,  exceeds  the  value  given  by  the  formulas: 


R  =  safe  reaction 
W  =  safe  concentrated  load 
t  :=  thickness  of  web,  in  inches 
d  ^  unsupported  depth  of  web,  in  inches 
B  =  distance  over  which  reaction  is  applied 
Bi  =  half  of  distance  over  which  concentrated  load  is  applied 

3  d' 
f  =  safe  unit  resistance  of  web  to  buckling  ^=  15,000  —  T":? 

°  '  4   r 

The  section  of  the  stiffeners  shall  be  such  that  the  unit  bearing  stress  on  the  combined 
effective  bearing  areas  of  the  stiffeners  and  the  web  will  not  exceed  that  allowable. 

Even  though  the  web  of  the  beam  is  sufficient  to  meet  the  requirements  of  the  fore- 
going formulas,  the  flanges  shall  be  stiffened,  if  necessary,  to  give  effective  distribution. 

The  stiffeners  shall  extend  as  nearly  as  practicable  to  the  edges  of  the  flange  angles 
or  the  beam  flanges  and  shall  be  connected  to  the  web  by  enough  rivets  to  transmit  the 
stress.  Such  stiffeners  shall  not  be  crimped.  Only  the  part  of  the  stiffener  section  beyond 
the  fillet  of  the  flange  angle  or  of  the  beam  flange  shall  be  considered  effective  in  bearing. 


Iron    and    Steel    Structures 357^ 

504-5-6  p.  15-20 
Revise  to  read: 

Preparation  of  Holes 

504.  Holes  shall  be  cylindrical  and  perpendicular  to  the  member.  They  shall  be 
clean-cut,  without  torn  or  ragged  edges. 

Holes  in  material  not  more  than  %  inch  thick  used  for  lateral,  longitudinal  or  sway 
bracing,  lacing,  stay  plates,  diaphragms,  inactive  fillers,  and  stiffeners  not  at  bearing 
points,  may  be  punched  full-size,  except  that  holes  through  assembled  material  shall  not 
consist  of  both  reamed  holes  and  holes  punched  full-size.  Holes  in  material  more  than 
%  inch  thick  used  for  such  parts  shall  be  sub-punched  and  reamed  or  sub-drilled  and 
reamed. 

If  there  are  not  more  than  three  plies  of  main  material  and  if  no  ply  is  more  than 
%  inch  thick,  holes  in  the  main  material  may  be  punched  full-size. 

If  there  are  more  than  three  plies  of  main  material  or  if  the  thickness  of  any  ply 
of  main  material  is  more  than  5^  inch  but  not  greater  than  the  nominal  diameter  of  the 
rivet  less  }i  inch,  holes  in  all  phes  of  main  material  shall  be  sub-punched  or  sub-drilled, 
and  reamed  after  assembly. 

If  the  thickness  of  any  ply  of  main  material  is  greater  than  the  nominal  diameter  of 
the  rivet  less  %  inch,  holes  in  such  ply  of  main  material  shall  be  sub-drilled.  Holes  in 
the  other  plies  of  main  material  may  be  sub-punched,  or  sub-drilled,  and  reamed  after 
assembly. 

Stiffeners  and  active  fillers  at  points  of  bearing  shall  not  be  considered  main  material 
in  determining  the  number  of  plies,  but  should  any  sub-punching,  or  sub-drilling,  and 
reaming  be  required  by  reason  of  thickness  of  material,  all  holes  in  such  stiffeners  and 
fillers  also  shall  be  sub-punched,  or  sub-drilled,  and  reamed  after  assembly. 

Size  of  Holes 

505.  The  diameter  of  holes  punched  full-size  and  of  finished  holes  reamed  and  drilled 
shall  be  t'g^  inch  greater  than  the  nominal  diameter  of  the  rivets. 

The  diameter  of  the  die  for  punched  and  sub-punched  holes  shall  not  be  more  than 
^2  inch  greater  than  that  of  the  punch. 

The  diameter  of  holes  sub-punched,  or  sub-drilled,  prior  to  reaming  shall  be  A  inch 
less  than  the  nominal  diameter  of  the  rivets. 

The  diameter  of  sub-drilled  and  reamed  holes  shall  be  as  required  for  sub-punched 
and  reamed  holes,  or  else  the  holes  shall  be  drilled  to  finished  size  while  all  of  the  plies 
are  assembled. 

The  diameter  of  holes  for  turned  bolts  shall  not  be  more  than  3^2  inch  greater  than 
that  of  the  bolt. 

Reaming  and  Drilling 

506.  Reaming  shall  be  done  with  twisted-flute  reamers  directed  preferably  by 
mechanical  means.  Drilling  shall  be  done  with  twist  drills. 

703.  p.  15-26. 

Revise  first  sentence  to  read: 

703.  The  weights  of  rolled  shapes  and  plates  shall  be  computed  on  the  basis  of 
their  nominal  weights  and  dimensions  as  shown  on  the  approved  shop  drawings,  deduct- 
ing for  copes,  cuts,  and  open  holes. 


358 Iron    and    Steel    Structures 

525  p.  15-22 

Revise  to  read: 

Fit  of  Stiffeners 

52S.  The  bearing  ends  of  stiffeners  on  beams  and  girders  shall  be  milled  or  ground 
to  bear  against  the  flange  or  else  shall  be  welded  to  the  flange,  except  that  welding  to  a 
flange  at  a  point  where  the  tensile  stress  exceeds  one-fifth  of  that  allowable  will  not  be 
permitted.  The  fit  of  other  stiffener  ends  against  the  flange  shall  be  such  as  to  exclude 
water  after  being  painted.  Fillers  and  splice  plates  shall  be  made  to  fit  within  ^  inch  at 
each  end. 

XII.  Steel  Castings,  p.  15-^2 

Change  Serial  A27-36  T  in  the  reference  to  ASTM  specifications  to  read  "Serial 
A27-39". 

1611.  p.  15-48 

Add  a  section  to  read: 

Welding 

1611.  Welding  of  structural  alloy  steel  will  not  be  permitted. 

The  following  revision  of  the  Rules  for  Rating  Existing  Iron  and  Steel  Bridges  is 
recommended: 

108  p.  15-123 

Under  (c)  Hammer  Blow  Effect,  Clause  3,  substitute  the  numeral  5  for  the  quan- 
tity n^  in  the  denominator  of  the  last  term  in  both  formulas  (a)  and  (b). 

Instructions  for  the  Maintenance  Inspection  of  Steel  Bridges 

In  accordance  with  instructions  to  collaborate  with  Committee  12 — Rules  and 
Organization,  on  matters  affecting  bridges,  Committee  15  in  1939  submitted  to  Com- 
mittee 12,  Instructions  for  the  Maintenance  Inspection  of  Steel  Bridges,  to  replace  cor- 
responding material  previously  adopted  for  publication  in  Chapter  12 — Rules  and 
Organization,  and  published  in  the  1929  Manual.  However,  in  accordance  with  the 
suggestion  received  from  Mr.  W.  T.  Dorrance,  chairman  of  Committee  12,  that  these 
instructions  would  properly  be  a  part  of  Chapter  15,  Committee  15  submits  the  follow- 
ing instructions  with  the  recommendation  that  they  be  adopted  for  publication  in 
Chapter  15  of  the  Manual. 

INSTRUCTIONS  FOR  THE  MAINTENANCE  INSPECTION 
OF  STEEL  BRIDGES 

1.  The  inspection  of  steel  bridges  shall  be  under  the  general  supervision  of  the  Chief 
Engineer  of  Maintenance,  the  Bridge  Engineer,  or  other  general  officer  in  charge  of 
bridge  maintenance.  Direct  supervision,  on  each  maintenance  unit,  shall  be  under  some 
designated  officer  herein  called  General  Bridge  Inspector. 

2.  One  or  more  competent  bridge  inspectors  for  each  maintenance  unit,  who  are 
familiar  with  and  have  a  general  knowledge  of  steel  bridges,  shall  be  assigned  for  the 
inspection  of  bridges  under  the  direct  supervision  of  the  General  Bridge  Inspector. 

3.  The  General  Bridge  Inspector  shall  personally  inspect  all  steel  bridges  in  his  ter- 
ritory at  least  once  each  year,  and  those  requiring  special  attention  more  frequently. 


Iron   and    Steel    Structures 


359 


4.  Bridge  inspectors  shall  forward  promptly  to  the  General  Bridge  Inspector,  on  the 
form  provided,  a  report  of  each  bridge  inspected.  The  report  shall  state  the  conditions 
found  in  each  individual  part,  regardless  of  what  may  have  been  reported  previously. 

5.  When  the  bridge  inspector  finds  defects  that,  in  his  opinion,  are  of  such  a  nature 
as  to  make  traffic  at  regular  speed  unsafe,  he  shall  take  the  necessary  steps  to  have  the 
speed  limited  to  that  which  he  considers  safe.  Immediately  after  the  inspector  has  taken 
steps  to  protect  traffic,  he  must  notify  the  Train  Dispatcher  by  telegraph  or  telephone, 
sending  copy  to  the  Division  Engineer  and  the  Division  Superintendent,  giving  the  safe 
speed  limit  and  briefly  describing  the  necessary  repairs.  He  shall  follow  this  immediately 
with  a  written  report  to  the  General  Bridge  Inspector,  giving  in  detail  the  defects  found. 

6.  The  General  Bridge  Inspector  shall  examine  these  inspection  reports  and  if  any 
defects  of  a  serious  nature  are  reported  he  shall  take  immediate  steps  to  have  the  nec- 
essary emergency  repairs  made.  After  the  General  Bridge  Inspector  has  examined  the 
inspection  reports,  he  shall  forward  one  copy  of  each  to  his  superior  officer,  calling 
attention  to  any  defects  which  are  not  of  an  emergency  nature  but  are  serious  enough 
to  warrant  the  attention  of  such  officer. 

7.  The  General  Bridge  Inspector  should  be  familiar  with  the  capacity  and  stability 
of  the  steel  bridges  under  his  charge.  If  any  defect  should  develop  which,  in  his  opinion, 
weakens  the  structure  or  any  member,  he  shall  report  to  his  superior  officer  immediately 
after  personal  inspection  with  his  inspector  and  the  division  officer  charged  with  the 
direction  of  bridge  maintenance,  giving  recommendations  for  remedying  the  defect.  He 
may  request  that  a  special  inspection  be  made  of  the  structure  by  a  representative  of  the 
Bridge  Engineer. 

8.  In  making  inspection  reports  the  following  abbreviations  are  permissible: 


A.B. 

Anchor  bolt 

I. 

Inner 

Bbl. 

Barrels 

I.S. 

Inside 

Bot. 

Bottom 

L. 

Angle 

B.W. 

Backwall 

Lat. 

Lateral 

Br.S. 

Bridge  seat 

Mas. 

Masonry 

Brkt. 

Bracket 

.  N. 

North 

Bm 

Beam 

0. 

Outer 

Chd. 

Chord 

o.s. 

Outside 

Concr. 

Concrete 

p. 

Post 

Conn. 

Connection 

Fed. 

Pedestal 

C.Pl. 

Cover  plate 

PI. 

Plate 

Diag. 

Diagonal 

PtI. 

Portal 

Diaph. 

Diaphragm 

Reinf. 

Reinforcing 

E. 

East 

Roll. 

Roller 

E.B. 

Eastbound 

S.Pl. 

Sole  plate 

Exp. 

Expansion 

S. 

South 

F.  Bm. 

Floor  beam 

Spl. 

Splice 

Fill. 

Filler 

Stiff. 

Stiffener 

Fig. 

Flange 

Str. 

Stringer 

Fdtn. 

Foundation 

u.c. 

Undercoping 

Fr. 

Frame 

Vert. 

Vertical 

G.R. 

Guard  rail 

Wpg. 

Waterproofing 

Gen.  Cond. 

General  condition 

W. 

West 

Gir. 

Girder 

W.B. 

Westbound 

Guss. 

Gusset 

W.W. 

Wing  wall 

Hor. 

Horizontal 

X. 

Cross 

Int. 

Intermediate 

360 Iron    and    Steel    Structures 

9.  The  bridge  inspector,  in  his  report,  shall  cover  the  following  points: 

(a)  Deck 

Size,  spacing  and  minimum  depth  of  ties. 

Whether  ties  are  treated  or  untreated. 

Uniformity  of  bearing  of  ties. 

Number  and  size  of  defective  ties. 

Size  and  condition  of  guard  timbers  and  guard  rails. 

Fastenings  of  ties. 

Fastenings  of  guard  timbers  and  guard  rails. 

Condition  of  walks  and  railings. 

Condition  of  refuge  bays. 

Condition  of  ballasted  deck,  and  depth  of  ballast  measured  from  base  of  rail 

at  each  end  of  bridge. 
Whether  waterproofing  is  effective   or  requires  repairs. 

(b)  Fire  Protection 

Description  and  condition  of  fire  protection. 

(c)  Track 

Weight  of  rail  and  size  of  tie  plates. 

Condition  of  rails,  joints,  and  fastenings. 

Alinement  of  track  and  its  location  with  reference  to  the  steel  structure,  at 

ends  and  center  of  each  span. 
Surface  of  track  on  bridge  and  on  approaches. 
Where  track  is  out  of  line   or  surface,   the   report  shall  show   the   location, 

amount,  and  probable  causes. 

(d)  Shims  and  Blocking 

Conditions  of   shims   and   blocking,   giving   description   and   location,  making 
sketch  if  necessary. 

(ej  Bridge  Seats 

Condition  and  cleanness. 

(f)  Anchors  and  Bearings 

Whether  the  superstructure  is  securely  anchored   to   the  masonry. 

Whether  bed  plates,  rollers,  rockers,  and  pedestals  are  clean,  in  correct  position 

and  have  full  bearing. 
Whether  expansion  bearings  are  functioning  properly. 
Whether  bed  plates  are  wearing  into  masonry. 
Whether  there  are  any  flaws  or  breaks  in  bearings. 

(g)  Expansion 

Clearance  between  expansion  ends  and  masonry  or  adjoining  spans. 
Whether  there  is  any  apparent  movement  of  the  masonry. 

(h)  Paint 

Condition  of  paint. 

Date  of  last  painting,  number  of  coats  and  kind  of  paint,  if  stenciled  on  the 

bridge. 
Whether  spot  painting  or  repainting  is  needed. 

(i)  Straightness  and  Alinement  of  Members 

Condition  of  individual  members  as  to  bends  and  kinks. 
AUnement  of  trusses,  girders,  floor  members  and  towers. 
Slackness  of  eye-bars  and  adjustment  of  counters, 


\ 


Iron    and   Steel   Structures 361 

(j)  Damage  From  Blows 

Parts  damaged  by  blows  from  equipment,  lading  or  floating  objects. 
Location  and  extent  of  damage,  making  sketch  to  show  parts  damaged  and 
repairs  suggested. 

(k)  Cracks  and  Breaks 

Where  parts  or  welds  to  be  examined  for  cracks  or  breaks  are  in  dark  or 

poorly  lighted  places,  examination  should  be  made  with  flashlight  or  other 

artificial  light. 
Cracks  and  breaks,  especially  in  floor  connection  angles,  stringer  flange  angles 

under  tie  bearings,  hangers,  pin  plates,  fillets  of  angles  of  flanges  and  posts, 

and  in  end  sections  of  lower  chords  or  flanges  over  or  near  bearings. 
Cracks  in  webs  of  floor  beams  where  bottom  flange  angles  do  not  extend 

under  end  connection  angles. 
Lateral  bracing  and  cross  frames,  especially  those  of  spans  on  curves. 
Welds  on  lateral  bracing  and  cross  frames,  stiffeners  and  other  welded  details. 
(I)  Pins,  Pin  Holes  and  Nuts 

Condition  of  pins  and  pin  holes,  as  to  movement  and  wear. 

Pins  should  be  observed  under  traffic  if  practicable.  The  report  shall  give  the 

location  of  pins  observed,  the  amount  of  movement  of  the  pins,  and  the 

wear  of  pins  and  pin  holes  if  it  can  be  determined. 
Whether  pin  nuts  are  tight. 

(m)  Rivets  and  Turned  Bolts 

Location  and  number  of  rivets  and  turned  bolts  that  are  loose  and  of  rivets 
that  have  badly  corroded  heads,  giving  special  attention  to  floor  connections. 

(n)  Corrosion 

Condition  of  members  as  to  loss  of  section  from  corrosion,  noting  extent  of 

such  action,  with  measurements  of  remaining  section  if  members  are  badly 

corroded,  paying  close  attention  to  loss  of  metal  in  plates  and  angles  of 

lateral  systems  of  spans  on  curves. 
Damage  from  engine  blast  in  spans   over  other  tracks,  and  attachment  of 

blast  plates,  where  used. 
Top  chord  splice  and  connection  of  portal  angle  to  top  of  end  post  for  rust 

distortion  between  stitch  rivets. 

(o)  Cleanness 

Collection  of  dirt  on  horizontal  surfaces. 
(p)  Movable  Bridges 

(1)  Rail  Locks 

Wear  and  condition  of  rail  locks  and  rail  ends  and  whether  tolerances 
in  Part  64,  Signal  Section  Manual,  are  exceeded  (vertical  %  inch, 
horizontal  ^  inch). 

Signal  interlocking  connections. 

(2)  Charts  and  Diagrams 

Whether  an  operating  diagram  is  posted. 
Whether  electrical  wiring  diagram  is  posted  or  is  available. 
Whether  lubrication   chart   is   posted   and   the   instructions   on   it   are 
followed. 


362 Iron   and   Steel    Structures 

(3)  Lubrication 

Whether  moving  parts  have  been  kept  sufficiently  lubricated.  They 
should  be  observed  during  operation.  The  report  shall  show  whether 
lack  of  lubrication  is  due  to  inattention  or  to  inadequate  facilities. 
If  facilities  are  inadequate,  complete  information  shall  be  given  with 
recommendation  for  improvement. 

(4)  Gears 

Condition  of  gears  as  to: 
Accurate  meshing 
Fit  on  shafts 
Fit  of  keys 

Breaks,  flaws  and  excessive  wear  (on  gear  teeth  and  keys) 
Protection  against  falling  objects 
Safety  guards 
Cleanness 

(5)  Bearings 

Whether  bearings  have  proper  hnings  and  good  running  fit. 

Whether  shafting  is  accurately  alined,  so  as  not  to  weave  or  wobble 
in  bearings  or  between  them ;  also  whether  collars  and  thrust  bear- 
ings are  in  adjustment. 

Attachment  of  caps  to  bases  and  of  bearings  to  supports. 

Alinement,  fit,  and  wear  of  trunnions,  rollers,  and  sheaves  in  their 
bearings. 

(6)  Cables 

Adjustment  of  cables  as  indicated  by  slackness,  inclination  of  equalizer 

bars,  or  uneven  seating  of  spans. 
Condition  of  cables  as  to  rust  and  excessive  accumulations  of  hardened 

grease. 
Broken  wires  and  broken  strands. 
Condition  as  to  lubrication. 
Working  clearances. 
End  connections  and  clamps. 

(7)  Clutches  and  Brakes 

Working  condition  and  cleanness. 

(8)  Power  Equipment 

Condition  of  power  unit  for  delivering  the  necessary  power. 
Whether  properly  maintained. 
(Q)  Mechanical  Features 
Operating  condition. 

Condition  and  adjustment  of  balance   wheels. 
Condition  and  adjustment  of  wedges  or  other  lifting  devices. 
Condition  and  adjustment  of  locking  devices. 
Adjustment  of  indicator  devices. 
Adjustment  of  toggle  arms  to  form  very  nearly  a  straight  line  when 

wedges  are  fully  driven. 
Turntable  of  swing  bridges,  including  rollers  and  treads  as  to  breaks 

or  flaws  that  might  cause  breaks. 
Clearance  through  a  complete  cycle  of  operation. 
Balance  through  a  complete  cycle  of  operation. 


Iron    and   Steel    Structures 363 

Safety  devices — electrical  and  mechanical. 

Lightning  protection  of  power  plant  and  superstructure. 

Condition   and   adjustment   of   guides,   centering    devices,   buffers,    and 

bridge  locks. 
Condition  and  fastenings  of  racks,  tracks  and  tread  plates. 
Condition  of  sheaves. 

(10)  Counterweights 

Condition  of  counterweights  and  their  supports. 
Safety  of  balance  or  counterweight  box. 

(11)  Navigation  Requirements 

Condition  of  hghts. 

Condition  of  siren  or  other  boat  signalling  devices. 
Condition  of  fenders  and  other  protection. 
Clearances  for  navigation. 

(12)  Record  of  Openings 

Whether   a   complete   record  is   being  kept   of  bridge   openings,   vessel 
movements,   and  happenings   affecting   the  interests   of   the   Railway 
Company. 

10.  The  inspector  shall  report  indications  of  overload  or  failure  in  any  part  of  the 
bridge.  He  shall  observe  the  behavior  of  the  bridge  during  the  passage  of  live  load,  if 
practicable,  noting  excessive  vibration,  deflection,  and  side  sway. 

11.  Attachments  of  wires,  pipes,  etc.,  that  may  be  harmful  to  the  bridge,  shall  be 
reported. 


Report  on  Assignment  3 
Non-Ballast  Type  Metal  Floor  Steel  Bridges 

G.  A.  Haggander  (chairman,  subcommittee),  James  Aston,  J.  E.  Bernhardt,  A.  W.  Car- 
penter, F.  S.  Hales,  A.  R.  Ketterson,  H.  S.  Loeffler,  F.  J.  Pitcher,  G.  L.  Staley,  F.  P. 
Turner. 

The  non-ballast  type  of  metal  floor  for  steel  bridges  is  adapted  to  places  where  the 
depth  from  base  of  rail  to  clearance  line  is  small.  It  was  widely  used  in  early  track 
elevation  structures. 

Figure  1  illustrates  an  early  and  simple  type  consisting  of  transverse  I-beams,  about 
1  ft.  3  in.  center  to  center,  acting  as  floorbeams  between  the  girders,  with  a  longitudinal 
plate  under  each  rail.  These  plates  usually  are  stiffened  by  angles  or  Z-bars  riveted  to 
the  edges  to  distribute  the  loads  longitudinally.  The  space  outside  of  these  stiffened  plates 
is  covered  by  a  thin  deck  plate  to  protect  the  I-beams  and  to  shelter  the  area  under  the 
bridge.  The  rail  is  fastened  to  the  longitudinal  plate  by  cast  clip  washers  and  bolts. 

This  type  of  floor  did  not  provide  for  track  circuit  insulation  and  was  noisy.  The 
bearing  of  the  rail  caused  considerable  wear  in  the  longituchnal  plate.  It  was  imprac- 
ticable to  adjust  the  grade  of  the  track  or  the  rail  if  that  became  necessary. 

To  overcome  these  faults  the  construction  shown  in  Fig.  2  was  generally  adopted. 
It  is  essentially  the  same  as  that  shown  in  Fig.  1  except  that  a  wood  or  fiber  shim  is 
inserted  between  the  rail  and  the  plate  to  provide  insulation,  prevent  wear,  and  reduce 
noise.  Fiber  bushings  and  washers  are  provided  for  the  clip  washers  and  bolts  to 
complete  the  insulation. 


364 


Iron    and    Steel   Structures 


7'- 6" 


,N 


6'-2x 


r5'-3i.i  L 


i  Plate 


Clggranca    Line  -» 


15'-4-2*-UI-3'  cirs 


CLEARANCL  TO  BASL   OF   RAIL. 

■     Plate  -  i" 

I- Beam  -  I? 

Plaits  and  anqle  -  3z 
Rivet  head  ~  f 

Total  •  l^i 


A  great  many  bridges  with  floors  of  this  type  are  in  service.  By  varying  the  thick- 
ness of  the  shims,  the  rail  may  be  surfaced.  If  wood  shims  are  used,  they  should  be 
placed  with  the  grain  transverse  to  the  rail  and  laid  continuous  to  reduce  splitting  and 
crushing.  A  tough  wood  without  pronounced  fiber  is  recommended. 

Figure  3  illustrates  a  rail  trough  floor  with  the  track  on  a  nine-degree  curve.  One 
rail  is  elevated.  A  flangeway  along  the  gage  side  of  the  low  rail  is  provided  by  a  pair 
of  heavy  angles  with  their  vertical  legs  well  braced  and  supporting  a  manganese  steel 
wearing  strip.  These  wearing  strips  are  bolted  to  the  angles  and  may  be  replaced  easily. 
This  particular  design  does  not  provide  for  insulating  the  rail,  the  circuit  being  carried 
around  the  bridge  by  a  cable. 

Figure  4  illustrates  a  conversion  of  the  bridge  shown  in  Fig.  1.  This  consists  of 
replacing  the  rail  trough  with  a  heavy  wide-flange  beam  and  supporting  the  rail  on  this 
beam.  This  beam  distributes  the  load  more  effectively  over  the  floor  beams.  The  rail  is 
well  fastened  and  insulated.  This  plan  requires  a  raise  of  grade  which  also  improves  the 
clearances. 

Figure  S  illustrates  a  rail  fastening  to  a  trough  type  floor.  In  the  original  construc- 
tion the  rail  rested  on  a  small  steel  plate  riveted  to  the  top  trough  section.  This  was 
replaced  by  the  construction  shown,  which  carries  the  load  to  the  vertical  trough  plates 
and  provides  insulation. 


Iron   and    Steel    Structures 


365 


Generally,  the  first  cost  and  maintenance  cost  of  these  types  are  higher  than  for  types 
with  ballasted  decks.  To  offset  this,  the  reduced  floor  depth  may  result  in  lower  cost  of 
the  approaches. 

A  floor  of  this  type  is  not  justified  unless  there  is  no  alternative  within  reasonable 
first  cost  when  all  of  the  factors  are  considered. 


hboW-  HiK  Hd 
Lock  Hu\ 

Sl««l    Cut    \Nash«r 
ibrc   Washer 
■fibre    Bushing 
rClip   Washer 


fContinuous     Wood  or 
Lfibrc    Shtm  Tran»w5«  to  QaiI 


■• 

1 ''■" 

— 

-- 

IT. 

1 
1 

-r 

I "'~\ 

1 — /<• 

— 

> 

o 

o 

t  Floor   Beomj 

1 

o 

Im 

- 

t 

( 

o 

0 
0 

1 

o 

o 

p 

1 

> 

1\ 

0 

o 

■  ^ 

<   £ 

CM  fl 

0 

1 

o 

t  Floor   Btotn  i 

\ 

o 

\ 

1 

" 

-r 

u 

"(O 

0 

[ 

■ 

J 

/ji 

?i 

» 

PLAN 


Fig.  2. 


366 


Iron    and    Steel    Structures 


Iron   and   Steel    Structures 


367 


iS\  f  Plate 
6- 60*  ^  Baom." 
f  PI  Sliff«nir 
i  Fillet  Welds. 


Spring    Washer 

Clamp 
8*  Bolt. 

"Spring   Washer 
|— Washer 

Fibre  Insulafion 
Tie  Plote. 
Z  Fibre  Insulation 
Fibre   Insulation 
Washer. 
\[Compres5ed  Timber 

W^"*''°"      i- Fillet     Weld 

*        ~^r^i  Plate 
l?-I  £>  45* 


SECTION. 


368 


Iron   and    Steel    Structures 


r-^ ci ^Ti ^Zi ^rii irii .c 


,Bok»liU    Channel    Not    fe    Exceed    6ik  , 

SECTION     A-A. 


i  i            li  . 

1    ,             r- 

1   jV-e 

^ 

V4» 

1 — 


PLAN    6c   ELEVATION 
OF   CLIP    INSULATOR- 


PLAN    6c   ELEVATION 
OF  RAIL    CUP. 

Fig.  S. 


Report  of  Committee  11 — Records  and  Accounts 

C.  A.  Knowles,  Chairman,    J.  H.  Hande  H.  L.  Restall,  Vice- 
Anton  Anderson                      R.  J.  Herring  Chairman, 

F.  B.  Baldwin  A.  T.  Hopkins  O.  M.  Miles 

H.  D.  Barnes  C.  D.  Johnson  A.  T.  Powell 

S.  H.  Barnhart  W.  R.  Kettenrinc  C.  P.  Richardson 

B.  A.  Bertenshaw  E.  M.  Killough  F.  M.  Spiegel 
W.  C.  BoLLN  P.  R.  Leete  H.  J.  Stroebel 
E.  V.  Braden  Henry  Lehn  D.  C.  Teal 

W.  F.  CuMMiNGS  W.  M.  Ludolph  V.  P.  Turnburke 

V.  H.  Doyle  D.  O.  Lyle  H.  C.  Wertenbkrger 

D.  E.  Field  W.  S.  MacCulloch  A.  O.  Wolf 

C.  C.  Haire  W.  S.  McFetridge  Louis  Wolf 

H.  N.  Halper  E.  W.  Metcalf  Committee 

To  the  American  Railway  Engineering  Association: 

Your  committee  respectfully  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 

Progress  report — presented  as  information    page  370 

2.  Bibliography   on  subjects  pertaining  to  records  and  accounts. 

Progress   report — presented  as  information    page  371 

3.  Office  and  drafting  room  practices: 

(a)  Drafting  equipment  and  tools; 

(b)  Specifications  of  materials  to  be  used  for  drawings  and  drafting; 

(c)  Standard  system  for  fiUng  drawings. 

Progress  report — presented  as  information,  with  recommended  conclusions  for  pub- 
lication in  the  Manual    page  373 

4.  Recommended    practice    to    be    followed    with    respect    to    maintenance    of    way 
accounts  and  statistical  requirements. 

Progress  report — presented  as  information   page  379 

5.  Construction  reports  and  records: 

Forms    for    recording    complete    descriptive    statement    of    quantities    and    other 
physical  characteristics  of  construction  projects. 
No  report. 

6.  Valuation 

(a)  Resume  of  developments  of  the  current  year  in  connection  with  regulatory 
bodies  and  the  courts. 

Progress  report — presented  as  information   page  379 

(b)  ICC  Valuation  orders,  reports  and  records. 

Progress   report — presented   as   information,   with   a   recommended   addition    to    the 
Manual    page  381 

7.  Report    upon    changes    in,    revisions    and    interpretations    of,    ICC    accounting 
classifications. 

Progress  report — presented  as  information   page  382 

8.  Methods  for  avoiding  duplication  of  reports  and  for  simpHfying  and  coordinating 
work  under  the  requirements  of  the  ICC  and  other  public  authorities. 

Progress  report — presented  as  information   page  385 

9.  Records  of  property  leased  and  available  for  lease. 
No  report. 

The  Committee  on  Records  and  Accounts, 

C.  A.  Knowles,  Chairman. 

Bulletin  422,  January,  1941. 

369 


370  RecordsandAccounts 


aibert  fierce  JUSepmoutl) 

Albert  Pierce  Wej'mouth,  a  member  of  the  Committee  on  Records  and  Accounts 
since  1928,  died  November  13,  1940,  at  his  home  in  Ben  Avon,  Pittsburgh,  Pa.  He  was 
born  in  Dorchester,  Mass.,  February  20,  1882,  and  was  graduated  from  Massachusetts 
Institute  of  Technology  in  1904.  Following  his  graduation  he  entered  the  service  of  the 
Pennsylvania  Railroad  in  the  engineering  department  at  Pittsburgh.  He  remained  in  that 
department  during  his  entire  service  and  through  successive  advancements  became  assist- 
ant engineer  on  the  staff  of  the  chief  engineer  at  Pittsburgh,  which  position  he  had  held 
for  over  twenty-five  years  at  the  time  of  his  death. 

He  is  survived  by  his  widow,  Mrs.  May  Myers  Weymouth,  a  daughter,  Frances  G., 
and  a  son,  Edward  A.  Weymouth,  all  of  Ben  Avon.  Mr.  Weymouth  was  devoted  to  his 
family,  to  the  Ben  Avon  Presbyterian  church,  of  which  he  was  an  elder,  and  to  his 
profession.  He  was  a  student  of  the  principles  of  engineering  and  valuation  accounting, 
which  prompted  him  to  become  a  member  of  the  Committee  on  Records  and  Accounts. 

His  experience  on  extensive  engineering  projects  in  the  Pennsylvania's  most  difficult 
territory,  combined  with  his  zeal  and  earnestness  in  the  pursuit  of  sound  accounting  and 
clear  records,  made  him  a  valuable  member  of  the  committee.  As  a  member  and  chair- 
man of  various  subcommittees  he  rendered  devoted,  unselfish  and  capable  service. 
Through  his  unobtrusive  but  effective  manner  and  his  pleasing  personaUty  he  won  and 
held  the  respect  and  friendship  of  his  associates.  It  is  with  a  sense  of  distinct  loss  to  the 
Committee  on  Records  and  Accounts  and  the  American  Railway  Engineering  Association 
that  the  members  of  the  committee  here  record  his  passing. 

E.  V.  Braden 

C.  C.  Haire 

Committee  on  Memoir 


Report  on  Assignment  1 
Revision  of  Manual 

D.  E.  Field  (chairman,  subcommittee),  W.  F.  Cummings,  J.  H.  Hande,  R.  J.  Herring, 
W.  R.  Kettenring,  P.  R.  Leete,  Henry  Lehn,  E.  W.  Metcalf,  A.  T.  Powell,  F.  M. 
Spiegel,  H.  J.  Stroebel. 

The  work  of  the  subcommittee  this  year  has  consisted  of  reviewing  all  forms  in  the 
Manual  to  determine  those  in  need  of  revision,  and  those  that  should  be  deleted.  This  was 
accomplished  by  having  each  member  of  the  subcommittee  review  that  portion  covering 
material  handled  by  some  other  subcommittee,  of  which  he  is  also  a  member.  At  this 
time  the  committee  recommends  no  change. 

During  the  next  year  the  subcommittee  will  look  into  the  possibility  of  a  new 
arrangement  of  the  material  in  Chapter  11  of  the  Manual,  to  the  end  that  it  may  be  put 
in  more  logical  sequence,  give  a  better  numbering  to  forms,  plates  and  pages,  and  simplify 
future  revisions. 


Records   and   Accounts 371 

Report  on  Assignment  2 
Bibliography  on  Subjects  Pertaining  to  Records  and  Accounts 

E.   V.   Braden    (chairman,   subcommittee),   Anton   Anderson,   B.   A.   Bertenshaw,   H.   N. 
Halper,  Henry  Lehn,  E.  W.  Metcalf,  C.  P.  Richardson,  D.  C.  Teal. 

The  practice  of  previous  years  has  been  followed  in  compiling  the  bibliography  for 
the  current  year.  Periodicals  likely  to  contain  important  articles  pertaining  to  railroad 
records  and  accounts  were  systematically  reviewed,  also  reference  lists  of  new  books 
and  pamphlets  for  items  of  special  usefulness  or  interest  to  members  of  the  Association. 
The  following  compilation  is  submitted  as  a  result  of  such  bibliographical  review  for  the 
period  from  November  1,  1939  to  November  1,  1940. 

Bibliography 
Books 

1.  Interpretations  of  ICC  Accounting  Classifications  of  Steam  Railroads.  By  Account- 
ing Division,  Finance,  Accounting,  Taxation  and  Valuation  Department,  AAR,  Washing- 
ton, D.  C.  Loose  Leaf.  $1  per  copy  to  member  railroads.  $1.25  to  non-members. 

This  book  contains  all  the  formal  interpretations  included  in  ICC  Accounting 
Bulletin  No.  IS,  also  the  informal  interpretations  issued  by  the  ICC  Bureau  of 
Accounts  and  designated  as  "A"  cases,  all  revised  to  March  1,  1940.  When  a  suffi- 
cient number  of  additional  interpretations  or  revisions  of  cases  previously  issued 
have  been  accumulated,  the  Department  of  Finance,  Accounting,  Taxation  and 
Valuation,  AAR,  will  issue  loose-leaf  supplements. 

2.  Code  of  Federal  Regulations  of  the  United  States  of  America — Having  General 
Applicability  and  Legal  Effect  in  Force  June  1,  1938. 

Title  49— Transportation  and  Railroads  (Vol.  14,  Book  1,  Vol.  14,  Book  2), 
two  volumes  covering  the  regulations  and  orders  of  ICC  1938  Supplement,  con- 
taining amendments  issued  to  Dec.  31,  1938.  Price  $2.25  per  volume  or  supplement, 
Superintendent  of  Documents,  Government  Printing  Office,  Washington,  D.  C. 

Pamphlets 

1.  Taxation  of  Railroads  in  the  United  States.  1936-1940.  A  list  of  references,  ar- 
ranged by  years  of  publication  by  the  Bureau  of  Railway  Economics  Library,  AAR, 
Washington,  D.  C.  20  typed  pp. 

2.  Railroad  Reorganization,  Practice  and  Policy;  Some  Aspects  and  Present  Trends. 
By  Joseph  R.  Warner.  Savings  Bank  Journal,  December  1939.  pp.  7,  26-32. 

3.  Valuation  or  Historical  Cost;  Some  Recent  Developments.  By  George  0.  May. 
(partner, — Price  Waterhouse  Company).  Dun's  Review.  May  1940.  Published  by  Dun  & 
Bradstreet,  Inc.,  New  York  City.  pp.  17-20,  49-50. 

4.  Railroad  Construction  Indices.  Compiled  by  Engineering  Section,  Bureau  of 
Valuation,  ICC,  Washington,  D.  C.  22  mimeo  pp.  Dated  August   1,  1940. 

5.  Symposium  on  Railroad  Reorganization.  Published  as  the  Summer,  1940,  issue  of 
Law  and  Contemporary  Problems,  Duke  University  Law  School,  Durham,  N.  C.  Con- 
tains the  following  13  articles  relating  to  Railroad  Reorganization: 

The  Development  of  Railway  Corporate  Structures. 

J.  W.  Barriger,  III,  chief  examiner,  Railroad  Division,  Reconstruction  Finance 
Corporation. 


372 Records   and   Accounts 

The  Background  and  Techniques  of  Equity  and  Bankruptcy  Railroad  Reorganiza- 
tions; A  Survey. 

Warner  Fuller,  professor,  Washington  University  School  of  Law. 
Progress  and  Delay  in  Railroad  Reorganizations  Since  1933. 

F.  D.  Dembitz,  attorney,  Reconstruction  Finance  Corporation. 
Some  Financial  and  Economic  Problems  in  Railroad  Reorganizations. 

Joseph  R.  Warner,  railroad  financial  analyst,  Newark,  N.  J. 

The    Relative    Treatment     of     Securities    in    Railroad    Reorganizations    Under 
Section  77. 
H.  J.   Friendly   and  L.   M.   Tondel,   Jr.,   attorneys,    Root,   Clark,    Buckner   & 
Ballantine. 

The  Case  for  a  Special  Railroad  Reorganization  Court. 

C.  M.  Clay,  assistant  general  counsel.  Reconstruction  Finance  Corporation. 
The  Judicial  and  Administration  Mechanism  of  Section  77. 

Leslie  Craven,  attorney.  Miller,  Owen,  Otis  &  Bailly. 
The  Representation  of  Security  Holders'  Interests  Under  Section  77. 

Wm.  G.  Fennell,  attorney,  Cadwalader,  Wickersham  &  Taft. 
Labor's  Interest  in  Railroad  Reorganization. 

A.  F.  Whitney,  president.  Brotherhood  of  Railroad  Trainmen. 
Protecting  the  User  Interest  in  Railroad  Reorganization. 

A.   B.   Rood,   executive   research   director.   Old   Colony   Commuters  &   Shippers 
League. 

The  Problems  of  the  Leased  Line. 

John  F.  Meek,  Jr.,  assistant  professor,  Yale  School  of  Law. 
The  Voluntary  Adjustment  of  Railroad  Obligations. 

Hubert  L.  Will,  attorney,  U.  S.  Department  of  Justice. 
The  Purchase  by  Railroads  of  Their  Own  Obligations. 

R.  T.  Swaine,  attorney,  Cravath,  deGersdorff,  Swaine  &  Wood. 

6.  Recent  Developments  in  the  Field  of  PubUc  Utility  Valuation  and  Accounting. 
Report  of  Special  Committee  American  Bar  Association,  32  pages,  1140  North  Dearborn 
Street,  Chicago. 

7.  Rate  of  Capitalizing  Railroad  Earnings  to  Establish  a  Valuation  for  Property 
Taxation.  N.  H.  Jacoby — Journal  of  Business,  University  of  Chicago.  13:  158-71,  April 
1940. 

8.  Transition  of  Depreciation  Accounting;  How  Public  Service  Commission  and 
Wisconsin  Utilities  have  met  this  problem.  A.  R.  Colbert,  Journal  Land  and  Public 
Utility  Economics,  16:    129-36.  May  1940. 


\ 


Records   and   Accounts 373 

Report  on  Assignment  3 
Office  and  Drafting  Room  Practices 

D.  C.  Teal   (chairman,  subcommittee),  B.  A.  Bertenshaw,  D.  E.  Field,  A.  T.  Hopkins, 
C.  D.  Johnson,  W.  M.  Ludolph,  E.  W.  Metcalf,  F.  M.  Spiegel,  H.  C.  Wertenberger. 

The  schedule  of  subjects  assigned  and  reported  on  herein  is  as  follows: 

(a)  Drafting  equipment  and  tools 

(b)  Specifications  of  materials  to  be  used  for  drawings  and  drafting 

(c)  Standard  system  for  filing  drawings 

The  basic  information  for  these  studies  has  been  developed  through  the  medium 
of  a  questionnaire  submitted  to  58  Class  I  railroads.  In  general,  the  practices  described 
and  recommended  are  those  of  the  majority  of  the  users. 

(a)  Drafting  Equipment  and  Tools 

A  report  on  this  topic  was  made  at  the  March,  1940,  convention  and  published  in 
the  Proceedings,  Vol.  41,  pages  454  to  456,  as  information.  It  contains  a  list  of  the 
drafting  tools  ordinarily  owned  by  the  draftsman  and  also  the  items  of  equipment  usually 
furnished  by  the  railroad.  General  recommendations  were  made  for  selection  of  new 
equipment. 

After  reviewing  the  subject  matter  again,  your  committee  is  of  the  opinion  that  the 
report  submitted  in  1940  adequately  covers  the  assignment.  It  is  recommended  that  the 
subject  be  discontinued. 

(b)  Specifications  of  Materials  To  Be  Used  for  Drawings  and  Drafting 

The  most  commonly  used  materials  in  drawing  and  drafting  work  are  drawing, 
tracing  and  blueprint  papers  and  cloths,  pencils,  inks,  water  colors  and  erasers. 

To  judge  drawing  materials  correctly  is  very  difficult  as  most  of  the  important 
qualities  can  be  measured  only  with  the  aid  of  special  instruments  constructed  for  this 
purpose.  An  experienced  draftsman  may  be  able  to  select  a  drawing  paper  in  regard  to 
its  surface,  erasing  quality  and  transparency ;  however,  for  most  of  the  other  properties 
such  as  wearing  quality  and  permanence,  he  is  obliged  to  rely  on  his  own  past  experience 
or  trust  that  the  material  ordered  will  conform  to  the  small  sample  he  has  been  shown. 

In  choosing  drawing  materials,  it  is  necessary  to  keep  in  mind  whether  they  are  to 
be  used  for  pencil,  ink,  or  water  color  work,  for  indoor  or  outdoor  use,  and  whether  the 
drawings  are  to  be  permanent  or  temporary  records.  As  the  materials  used  become  an 
integral  part  of  the  finished  drawing,  in  theory,  their  general  quality  should  balance  and 
be  consistent  with  the  permanence  and  importance  of  the  work  to  be  done.  However,  it 
is  not  practical  in  railroad  work  to  keep  large  amounts  or  a  wide  selection  of  drawing 
supplies  on  hand.  Regardless  of  initial  good  quality,  most  of  them  deteriorate  to  some 
extent  with  age.  Although  theoretically  it  would  be  well  to  have  a  selection  that  will 
cover  all  possible  needs,  in  practice,  this  would  necessitate  keeping  numerous  items  on 
hand  which  would  be  used  infrequently.  It  is  common  practice  and  common  sense  to 
order  drawing  room  supplies  monthly,  limiting  the  selection  to  those  types  whose  gen- 
eral quality  and  properties  are  adapted  to  the  major  requirements  of  the  work  to  be  done. 
The  table  lists  the  most  commonly  used  drawing  materials  together  with  the  special 
factors  to  be  considered  when  ordering  them,  with  general  all-round  utility  in  mind. 


374 


Records   and   Accounts 


Factors  Influencing  the  Selection  of  Drawing  Materials 


Item 
Drawing  papers  and  cloths 


Tracing  papers  and  cloths 


Profile  and  cross-section 
papers  and  cloths 


Print  papers  and  cloths 

Drawing  pencils 
Colored  pencils 


Waterproof  drawing  inks  and 
water   colors 


Erasers 


Properties  to  Consider 
Surface  (for  taking  pencil  or  ink) 
Erasing  quality  (to  suit  major  requirements) 
Color  (for  eye  strain  and  to  suit  other  requirements) 
Wearing  quality  (to  suit  major  requirements) 
Permanency  (to  suit  major  requirements) 
Formation  (to  suit  major  requirements) 
Cleanliness   (to  suit  major  requirements) 

Transparency  (for  tracing  work  and  for  making  prints) 
Surface  (for  taking  pencil  or  ink) 
Erasing  quality  (to  suit  major  requirements) 
Wearing  quality  (to  suit  major  requirements) 
Permanency  (to  suit  major  requirements) 

Surface  (for  taking  pencil  or  ink) 

Permanency    (special  resistance  to  shrinkage  or  expan- 
sion to  protect  accuracy  of  engraving  line  work) 
Transparency  (for  making  prints) 
Color  of  engraving  lines  (for  eyestrain) 

Wearing    quaUty    (resistance    to    rough    handling    and 
folding) 

Permanency  (body  resistance  to  shrinkage  or  expansion 
to  protect  accuracy) 

Chemical  treatment  of  surface  (Permanency  and  reten- 
tion of  color  of  background  or  Unas) 

Ability  to  make  clean  black  lines 
Strength  and  uniformity  of  lead 
Opaqueness  of  lines  (for  tracing  work) 

Ability  to  make  clean  distinct  lines 

Contrast  and  vividness  of  colors 

Strength  and  uniformity  of  lead 

Indelible  versus  other  types  (Indelible  pencils  should  not 

be   used   on   drawings   or   prints   that   are   for   outdoor 

service,  because  of  possibility  of  getting  wet.) 

Opaqueness    (for  tracing  work) 
Ability  to  make  clean,  distinct  lines 
Permeating  tendencies 
Ease  of  erasing 

Ability  to  erase  without  damage  to  texture  of  paper  or 

cloth 

Uniformity  of  materials 

Operating  speed  and  effectiveness 


According  to  questionnaire  answers,  it  is  universal  practice  among  all  American 
railroads  to  order  drawing  materials  by  requisitions  on  the  general  storekeeper,  the  sta- 
tionery department  or  direct  on  the  purchasing  agent.  Requisitions  state  the  trade  name 
and  catalog  reference  of  the  brand  preferred  with  a  note  to  the  effect  that  acceptable 
substitutes  will  be  considered  in  order  to  allow  competitive  bidding.  Everyday  items  such 
as  drawing  paper,  tracing  cloth,  pencils,  etc.,  are  usually  ordered  on  the  basis  of  past 
experience,  while  innovations  are  selected  from  samples  submitted  by  the  manufacturer. 
The  standardized  commodities  are  usually  purchased  in  sufficient  quantities  to  obtain 
price  advantages.  Blueprint  paper  is  often  contracted  for  yearly  at  an  agreed  price,  orders 
being  placed  from  time  to  time  as  paper  is  needed. 


Records    and   Accounts  375 

A  wide  selection  of  drawing  materials  is  now  available  from  old  established  and 
reputable  dealers.  Prices  are  in  keeping  with  the  quahty  and  are  adequately  controlled 
by  the  competition  between  the  manufacturers. 

Your  committee  has  been  unable  to  find  any  instance  in  either  railroad  work  or 
other  industries  where  specifications  have  been  used  for  the  ordering  of  drafting  mate- 
rials. In  this  connection,  it  should  be  noted  that  their  production  is  highly  specialized 
work  which  is  confined  to  a  relatively  few  reptuable  manufacturers.  All  of  the  papers 
and  cloths  and  most  of  the  instruments  are  registered  with  the  U.  S.  Patent  Office.  The 
special  materials  and  patented  processes  used  to  produce  these  "trade  mark"  goods  are  in 
reahty  the  specifications  for  them. 

Conclusions 

Except  for  requirements  laid  down  to  the  paper  mills  by  the  drawing  supply  com- 
panies, no  specifications  are  now  in  use  or  available  for  the  ordering  of  drawing  and 
drafting  materials. 

The  present  almost  universal  practice  of  ordering  "trade  name"  materials  by  catalog 
reference  and  from  samples,  limiting  the  selection  to  standard  types  having  general  quality 
and  properties  suited  to  the  major  requirements  of  the  office,  is  quite  satisfactory  for 
railroad  work. 

It  is  considered  unnecessary  and  impractical  to  attempt  the  preparation  of  definite 
specifications  at  this  time  for  the  ordering  of  drawing  materials. 


The  report  is  presented  as  information  with  the  recommendation  that  the  subject  be 
discontinued. 

(c)   Standard  System  for  Filing  Drawings 

Railroad  drawings  are  the  records  of  land  ownership,  tracks,  bridges,  buildings, 
equipment  and  other  work.  They  are  valuable  as  permanent  records,  and  are  also  needed 
frequently  for  reference  when  planning  new  facilities  and  for  handling  routine  business. 
It  follows  that  they  should  be  filed  in  a  safe  place  as  well  as  in  a  manner  to  make 
them  easily  accessible. 

Drawings  should  be  filed  efficiently  and  systematically,  but  how?  One  railroad  draft- 
ing room  has  one  type  of  equipment,  the  next  one  another.  Drawings  are  indexed  alpha- 
betically, geographically  and  numerically.  They  are  stored  in  vertical  filing  cases,  in  flat 
horizontal  drawer  cabinets,  and  in  pigeonhole  tubes.  The  methods  used  depend  partly 
upon  the  type  of  filing  equipment  that  is  available  and,  while  systems  may  vary  as  to 
details,  they  are  usually  alike  in  certain  essentials. 

In  the  larger  sense  to  which  this  report  is  dedicated,  filing  involves  three  things. 

1.  Numbering  and  coding 

2.  Indexing 

3.  Filing  equipment 

Numbering  and  Coding 

As  indicated  by  the  phrasing,  the  numbering  and  coding  of  drawings  are  usually 
so  combined  and  correlated  that  they  have  to  be  considered  as  one  operation. 

The  drawing  number  serves  two  purposes,  (1)  for  easy  identification  and  (2)  for 
locating  in  the  storage  files.  As  they  are  completed,  the  drawings  are  assigned  numbers 
that  embody  code  letters  or  symbols  to  indicate  where  they  are  to  be  kept.  The  number 
thus  becomes  the  intermediary  agent  between  the  card  index  catalog  and  the  fiHng  cabinet. 
The  storage  equipment,  of  course,  has  to  be  identified  and  labeled  in  accordance  with 
the  system  used. 


376 Records   and   Accounts 

Most  offices  number  serially,  starting  from  one.  However,  there  are  others  that  start 
new  numbers  with  each  individual  file  case. 

The  filing  information  may  be  placed  at  the  beginning  or  it  may  be  at  the  end  of 
the  main  number.  In  the  latter  case,  Drawing  No.  1234-A-IV-a  would  indicate  that 
Drawing  1234  belongs  in  cabinet  "A",  drawer  "IV",  compartment  "a".  In  some  cases 
only  the  drawers  and  their  compartments  are  identified.  Drawing  No.  1234-A-l  would 
here  belong  in  drawer  A,  compartment  1.  This  plan  is  feasible  in  smaller  offices  and  when 
the  equipment  is  suitable.  The  flat  drawer,  sectional  type  cabinets,  to  which  new  sec- 
tions can  be  added  as  needed,  are  adaptable  to  this  scheme. 

One  railroad  with  two  types  of  filing  equipment  distinguishes  between  pigeonhole 
and  drawer  filing  by  prefixing  a  "Ph"  or  "Dr"  to  the  number.  The  range  of  numbers 
contained  is  posted  over  each  receptacle.  In  this  manner  Drawing  Ph-2012  would  be  filed 
in  the  pigeonhole  marked  Ph-2000  to  Ph-2025. 

In  another  office,  new  numbers  are  started  for  each  cabinet  and  the  filing  cases  are 
identified  by  letters.  Here,  drawings  with  numbers  prefixed  by  the  letter  "A"  are  filed 
in  cabinet  "A"  and  those  with  prefix  "B",  in  cabinet  "B".  This  scheme  obviates  the  use 
of  large  numbers. 

One  railroad  files  its  small  letter-sized  drawings  in  looseleaf  type  file  binders.  The 
drawings  are  identified  by  book  and  page  numbers.  Drawing  No.  B-S,  P-100  is  filed  in 
book  S,  page  100. 

Besides  identifying  the  drawing  and  locating  it  in  the  files,  the  drawing  number 
often  contains  other  coded  information.  Sometimes  the  prefix  letters  indicate  the  depart- 
ment in  which  the  drawing  was  prepared.  Symbols  used  by  one  railroad  are: 

C.  E.  =  Chief  engineer's  office 
B.       =  Bridge  department 
S.  D.  ^  Signal  department 
W.S.=::  Water  supply  department 

When  such  prefixes  are  used,  the  filing  information  is  necessarily  placed  last.  Draw- 
ing No.  S.  D.-1000-D-2  would  be  a  drawing  prepared  by  the  Signal  department,  filed  in 
cabinet  D,  drawer  or  compartment  2. 

On  another  railroad,  where  all  drawings  are  under  the  jurisdiction  of  the  chief  engi- 
neer, prefix  letters  are  used  to  indicate  the  general  class  of  the  drawing,  for  example: 

A  ■=z  Architectural  drawing 
B  :=  Bridge  drawings 
C  =  Coaling  plant  drawings 
D  =  Dams 
S  =  Signal  drawings 

Here  again  the  filing  information  appears  at  the  end  of  the  main  number. 

Another  method  used  to  indicate  the  general  class  is  to  allot  a  series  of  numbers  to 
each.  In  one  office,  drawing  numbers  0  to  9,999  are  assigned  to  buildings,  10,000  to 
19,999  are  for  bridge  drawings,  etc. 

There  is,  however,  one  class  of  drawing  for  which  all  railroads  use  the  same  num- 
bering system,  namely,  for  the  identification  of  right-of-way  and  track  maps  (valuation 
maps)  as  prescribed  by  the  ICC  in  accordance  with  Section  19A  of  the  Act  to  Regulate 
Commerce — second  issue,  effective  January  1,  1933.  The  ICC  instructions  are  included 
in  the  "Specifications  for  Preparation  of  Maps  and  Profiles",  appearing  as  Article  207 
on  page  11-66  of  the  Manual. 


R  e  c  ords    and   Accounts  377 

Indexing 

Filing  always  involves  indexing  and  indexing  means  first  of  all,  to  catalog  the 
drawings  on  index  cards  or  in  ledgers,  in  such  a  manner  that  they  can  be  quickly  found. 
This  is  usually  accomplished  by  first  hsting  the  drawing  on  a  "master"  numerical  index 
and  then  on  other  cards  grouped  according  to  location  or  by  subject  matter,  recording  the 
drawing  number,  title  and  other  pertinent  data,  and  making  cross  references  where  nec- 
essary. The  master  or  numerical  index  is  used  principally  for  keeping  track  of  the  last 
number  assigned.  It  is  also  indispensable  for  locating  plans  which  have  been  referred 
to  by  number  only. 

The  location  and  general  subject  indexes  supplement  the  master  numerical  index. 
They  are  the  ones  most  used  for  looking  up  drawings. 

Building  and  track  layout  drawings  are  usually  grouped  and  catalogued  according  to 
city  or  village  location  with  the  index  cards  arranged  alphabetically.  Bridge  drawings, 
because  of  their  "in  between  town"  locations  are  indexed  according  to  mile  post  location 
and  district,  subdivision  or  valuation  section,  with  cards  arranged  serially  or  geo- 
graphically. Profiles  and  track  charts  are  also  catalogued  in  this  manner. 

Standard  drawings,  which  illustrate  items  of  equipment  and  recommended  con- 
struction methods,  are  best  indexed  by  subject  matter.  Standard  drawings  as  a  rule 
require  more  cross  references  than  the  others. 

One  railroad  uses  a  colored  card  system  for  grouping. 

White  cards  are  for  station,  track  and  right-of-way  maps 
Blue  for  contract  plans 
Green  for  lease  plans 
Yellow  for  deed  plans 
Buff  for  profiles 

The  ICC  specifications  for  the  preparation  of  right-of-way  and  track  maps  do  not 
require  that  they  be  catalogued  in  any  special  manner ;  however,  most  railroads  have 
found  it  expedient  to  make  a  geographical  and  alphabetical  cross  index  for  them.  This  is 
usually  in  ledger  or  bound  book  form.  With  such  an  index  and  knowing  either  the  mile 
post,  valuation  section,  or  town  location,  it  is  an  easy  matter  to  find  the  proper  drawing. 

It  is  important  that  sufficient  data  be  posted  on  the  index  cards  to  thoroughly 
identify  the  drawing  and  to  make  it  unnecessary  to  pull  out  three  or  four  from  the 
files  before  finding  the  right  one.  Sometimes  the  descriptive  matter  is  so  vague  as  to 
cause  inefficient  office  routine.  The  essential  information  required  by  all  systems  is: 

1.  Drawing  number  and  fifing  reference 

2.  Title   (Additional  quahfying  or  descriptive  information  here  will  assist  in  recog- 
nizing the  plan  wanted.) 

3.  Scale,  if  any 

4.  Date 

5.  Type  of  drawing  (cloth  tracing,  paper  tracing,  blueprint,  etc.) 

Supplementing  the  above  information,  some  offices  note  additional  data,  such  as: 

6.  Reasons  for  preparation,  or  purpose,  such  as: 

a.  Proposed 

b.  As  built 

c.  Retirement 

7.  Revision  dates 

8.  Maker  of  plan 

9.  Office  where  made 


378 Records    and    Accounts 

Filing  Equipment 

Filing  equipment  is  generally  described  in  terms  of  the  kind  of  storage  that  is 
provided,  or  as  vertical,  horizontal  and  roll. 

The  vertical  type  cabinet  can  be  used  for  the  storage  of  both  large  and  small 
drawings.  The  drawings  are  grouped  according  to  size  and  placed  in  folders  of  appro- 
priate dimensions.  The  smaller  folders  are  held  upright  in  slot-partitioned  drawers  and 
the  larger  ones  hung  in  box-like  cases.  Total  storage  capacity  is  quite  large,  with  each 
folder  holding  about  fifty  tracings.  This  system  is  particularly  convenient  when  it  is 
desired  to  group  together  complete  sets  of  plans  for  a  large  construction  job.  Right-of- 
way  and  track  maps   (valuation  maps)   are  usually  stored  in  this  manner. 

Horizontal  drawer  cabinets  are  more  commonly  used  than  any  other  type  of  filing 
equipment.  The  flat  drawers,  partitioned  to  suit  different  size  drawings,  are  well  suited 
for  the  filing  of  active,  semi-active  or  inactive  drawings.  New  sectional  units  can  be 
added  when  necessary  to  increase  storage  capacity.  The  shallow  drawers  permit  quick 
handling  with  but  little  wear  and  tear  on  the  tracings. 

In  the  Proceedings  for  1938,  Vol.  39,  pages  659  and  660,  is  shown  a  partitioning 
arrangement  of  flat,  horizontal  drawers  to  suit  different  sizes  of  drawings.  The  partitions 
are  made  with  thin  wood  strips  fastened  to  the  bottom  and  sides  of  the  drawers.  In 
practice,  it  has  been  found  advisable  to  partition  off  only  three  or  four  drawers  at  a 
time.  Then,  as  existing  compartments  become  filled,  new  partitions  can  be  installed  to 
suit  the  sizes  required. 

While  roll  filing  is  especially  adapted  to  long  or  odd  sized  drawings,  this  method 
can  be  used  for  all  sizes  and  is  done  in  drawer  style  cabinets  as  well  as  pigeonhole 
cabinets  or  shelves. 

Some  offices  use  only  one  type  of  filing  equipment;  others  combine  the  use  of  the 
three.  Approximately  SO  percent  of  the  railroads  own  vertical  units.  All  of  them  own 
and  use  some  kind  of  horizontal  and  roll  filing  equipment. 

It  is  found  impractical  to  classify  filing  cabinets  according  to  sizes  as  each  drafting 
organization  has  to  provide  for  its  own  individual  requirements. 

Filing  calls  for  other  specialized  equipment  such  as  index  card  files,  guides,  etc. 
Filing  equipment  of  all  kinds  is  now  obtainable  in  stock  sizes  that  will  suit  almost  any 
requirements.  Units  are  now  advertised  that  combine  all  three  methods  of  filing  in 
addition  to  having  special  box  compartments  for  card  indexes  and  shelves  for  the  storage 
of  field  notebooks. 

Conclusions 

It  cannot  be  said  that  one  method  is  always  better  than  another  because  that  which 
is  best  suited  to  the  individual  needs  of  one  office  might  not  be  so  well  adapted  to 
another.  Each  system  has  its  special  features  and  advantages. 


The  portion  of  the  report  presented  above  is  offered  as  information. 

Supplemental  Subjects 

In  addition  to  the  assigned  work,  your  committee  has  reviewed  two  subjects  reported 
on  previously,  for  possible  Manual  inclusions. 

Welding  Symbols 

At  the  present  time  there  are  no  welding  symbols  in  the  Manual. 

The  American  Welding  Society  has  recently  developed  a  new  code  of  welding  sym- 
bols which  is  now  being  considered  for  adoption  as  an  American  standard.  Recognizing 


Records    and    Accounts 379 

the  authority  of  the  American  Welding  Society,  it  is  believed  desirable  to  have  its 
symbols  available  for  drafting  room  use.  However,  until  such  time  as  they  have  been 
adopted  by  the  American  Standards  Association,  these  symbols  will  be  subject  to  revi- 
sions. To  avoid  having  material  in  the  Manual  which  might  soon  be  out  of  date,  it  is 
proposed  to  include  only  a  reference.  Your  committee  recommends  that  the  following 
information  be  published  in  the  Manual  on  page  11-98: 

WELDING  SYMBOLS 

It  is  recommended  that  the  symbols  of  the  American  Welding  Society  be  used. 
These  symbols  together  with  instructions  for  their  use  are  pubhshed  in  bulletin  form  and 
may  be  obtained  from  the  American  Welding  Society. 

Style  To  Be  Used  in  the  Preparation  of  Reports  and  Specifications 

In  the  Proceedings  for  1938,  Vol.  39,  there  is  a  report  entitled  "Style  To  Be  Used  in 
the  Preparation  of  Reports  and  Specifications".  This  report  was  originally  presented  as 
information  but  with  the  understanding  that  it  would  be  reviewed  and  considered  for 
inclusion  in  the  Manual. 

Your  committee  recommends  that  the  material  shown  in  Proceedings  for  1938. 
Vol.  39,  pages  661  to  669,  inclusive,  be  published  in  the  Manual  as  pages  11-121  to 
11-129,  inclusive. 


Report  on  Assignment  4 

Recommended  Practice  To  Be  Followed  with  Respect  to  Mainte- 
nance of  Way  Accounts  and  Statistical  Requirements 

H.  L.  Restall   (chairman,  subcommittee),  Anton  Anderson,  E.  V.  Braden,  W.  F.  Cum- 
mings,  C.  D.  Johnson,  W.  M.  Ludolph,  W.  S.  McFetridge,  A.  T.  Powell,  D.  C.  Teal. 

The  committee  has  had  under  study  this  year  a  system  of  recording  the  physical 
characteristics  and  location  of  certain  types  of  electrical  equipment,  and  now  has  under 
consideration  the  enlarging  of  the  assignment  to  embrace  other  kinds  of  physical  prop- 
erty to  be  covered  by  a  uniform  system  of  recording. 


Report  on  Assignment  6  (a) 

Resume  of  Developments  of  the  Current  Year  in  Connection  With 
Regulatory  Bodies  and  the  Courts 

S.  H.  Barnhart  (chairman,  subcommittee),  F.  B.  Baldwin,  H.  D.  Barnes,  B.  A.  Berten- 
shaw,  W.  C.  Bolin,  V.  H.  Doyle,  D.  E.  Field,  C.  C.  Haire,  H.  N.  Halper;  R.  J.  Her- 
ring, A.  T.  Hopkins,  W.  R.  Kettenring,  E.  M.  Killough,  C.  A.  Knowles,  P.  R.  Leete, 
D.  O.  Lyle,  W.  S.  MacCulloch,  W.  S.  McFetridge,  H.  L.  Restall,  H.  J.  Stroebel,  V.  P. 
Turnburke,  H.  C.  Wertenberger,  Louis  Wolf. 

The  Transportation  Act  of  1940,  approved  September  18,  1940,  which  amended  in 
many  particulars  the  existing  Interstate  Commerce  Act,  carried  forward  without  change 
the  entire  Valuation  Act.  The  ICC  appropriation  for  the  fiscal  year  beginning  July   1, 


380 Records   and   Accounts 

1940,  includes  $640,000  for  its  Bureau  of  Valuation,  the  same  amount  as  for  the  previous 
two  years.  On  October  1,  1940,  the  total  force  of  the  bureau  numbered  188  employees. 

By  its  order  of  January  1,  1940,  the  ICC  increased  from  $100  to  $500  the  minimum 
amount  to  be  charged  to  the  Investment  in  Road  and  Equipment  Account  for  property 
changes,  which  will  result  in  reducing  the  number  of  minor  items  which  must  be  handled 
in  valuation  reporting  where  carriers  exercise  the  option  permitted  under  the  order. 

During  the  year  1939  Class  I  carriers  charged  to  Account  459,  Valuation  Expenses, 
an  amount  of  $425,589,  contrasted  with  $623,463  for  the  year  1938. 

Carriers  have  been  engaged  in  filing  with  the  Bureau  of  Valuation  reports  required 
by  Valuation  Order  No.  3,  consisting  of  returns  on  B.  V.  Form  588,  which  contain  the 
details  of  property  changes  necessary  to  bringing  previous  engineering  inventories  for- 
ward to  new  valuation  dates.  These  returns  are  likewise  utilized  by  the  Land  and 
Accounting  Sections  to  revise  their  land  reports  and  estimates  of  original  cost,  respectively. 
As  of  October  1,  1940,  all  Class  I  carriers  had  filed  these  returns  through  the  year  1935; 
98  percent,  through  1936;  87  percent,  through  the  year  1937;  69  percent,  through  the 
year  1938;  and  26  percent,  through  the  year  1939,  or  were  approximately  93  percent* 
current.  In  order  to  have  the  information  necessary  to  bring  their  underlying  valuation 
figures  to  current  dates,  the  director  of  valuation  requested  Class  I  carriers  to  file 
returns  on  B.  V.  Form  589,  Summary  of  Annual  Charges  and  Credits  to  Investment  in 
Road  and  Equipment  Account,  for  those  years  where  report  on  Form  B.  V.  588  was  not 
rendered. 

The  Engineering  Section  of  the  Bureau  of  Valuation,  having  completed  revised  inven- 
tories for  all  Class  I  carriers  through  1927,  is  engaged  in  bringing  these  inventories  for- 
ward to  later  dates  and  as  of  October  1  had  completed  64  percent  of  the  mileage  through 
1932;  41  percent  through  1934;  13  percent  through  1936;  and  2  percent  through  1938, 
or  approximately  59  percent*  current.  The  work  of  the  Accounting  Section  in  preparing 
summaries  of  original  costs  and  that  of  the  Land  Section  in  revising  land  valuations  have 
advanced  to  about  56  percent*  and  58  percent*,  respectively. 

No  tentative  valuations  as  of  current  dates  were  completed  and  served  on  railroad 
companies,  but  at  the  request  of  the  commission,  the  bureau  brought  to  date  the  under- 
lying valuation  estimates  of  carriers  involved  in  reorganization  proceedings.  In  some  in- 
stances, reports  were  prepared  showing  a  property  breakdown  by  mortgage  districts.  In 
a  number  of  cases,  carriers  checked  these  estimates  of  original  cost,  cost  of  reproduction 
new,  less  depreciation,  and  land  values. 

At  the  direction  of  the  commission,  the  bureau  also  spent  considerable  time  in  work- 
ing up  estimates  for  use  in  a  number  of  rate  cases  involving  switching  rates  and  also  in 
the  Barge  Line  case  involving  line  haul  rates,  hkewise  in  a  number  of  cases  involving 
competitive  truck  and  rail  rates.  Estimates  were  also  prepared  for  a  number  of  indi- 
vidual roads  relating  to  the  amount  of  deferred  maintenance,  if  any,  for  use  in  pending 
cases. 

During  the  year  the  Bureau  of  Valuation  completed  and  issued  its  final  valuations 
on  pipe  line  carriers  inventoried  as  of  December  31,  1934,  which  was  the  original  valua- 
tion date.  A  summary  showing  the  more  important  findings  in  these  valuations,  has  been 
prepared  by  the  bureau.  Copies  of  the  summary  may  be  procured  from  Mr.  E.  H.  Bun- 
nell, vice-president,  Finance,  Accounting,  Taxation  and  Valuation  Department,  AAR, 
Washington,  D.  C.  The  bureau  also  started  the  initial  work  of  inventorying  the  property 
of  those  pipe  line  companies  added  to  its  program  since  1934  and  served  a  few  tentative 
valuations,  and  issued  some  final  reports,  prepared  as  of  varying  dates  from  1937 
through  1939. 


Based  on  5,750,000  mile-years  from  basic  valuation  through  1939. 


—  H 


1 


Line 

No. 


1. 
i    6 

CI 


10 


11 


12 


13 


iA. 


il 


16 


18 


11. 


?0 


21 


22 

2U 


Ul_ 


RECORD     OF     BALLAST     CHANGES 


(Name  of  Road) 


AFE       I    Date 


--'  I       (0        I     (^)         I  (o) 


iTotal  Cu.YdsJ 


.-J X-. 

CUBIC 


YARDS 


_1_. 


J2L 


(W 


(9) 


(11) 


im 


(16) 


JiiL 


AML 


17  inches.  All  lines  and  printing  black.  Form  may  be  printed  as   perforated  sheet  for  bindinj; 


ord  card. 


•  21    . 

m 

;g^  j 

m 


general  locatit 


feet;    To  static 


INSTRCCTIOXS  FOR  USE  OF  FORM— 

This  form  may  be  used  for  recording  ballast  changes  or  as  a  continuing  record  of  ballast   inventory. 
The  spaces  in  the  top  of  the  form   (above   the  column  ruling)    may  be  used  for  recording  the  key   infor 
Recording  Separately  Each  Mile  oj  a  Group  of  Miles  on  One  Sheet  oj  Form: 
Use  columns  2  and  3   for  location  and  description  of  project. 
Columns  4  and  5  are  for  recording  AFE   number  and  date. 

Columns  6.  7  and  8  may  be  used  for  such  data  as  kind  of  ballast,  source  of  ballast,  average  haul,  e 
Show  in  the  upper  caption  space  of  column  9   (reading  downward).  Mile;   Length  feet;    From  station 

for  recording  for  each  mile  the   Mile  number;    Length;    Station;    Flus;   Station;   and  Plus. 
Line  1  should  be  used  to  designate   (in  any  selected  descriptive  column)   and   to  record  in  each  of  the   columns   10  to   18,   inclusive.   1 
computed  in  accordance  with  adopted  standard.  Column  9  should  record  the  total  yardage  shown   in  columns   10  to   18.   inclusive. 
Show  on  line  2    (0=-  as  many  of   following  lines  as  may  be  required)   and   in   appropriate  columns  the   "Basic  Inventory     of  ballast. 
Enter  in  successive  order  on  line  3    (or  line  next  following  "Basic  Inventory")   and   following  lines  changes    as    they    occur. 
Additions  and  retirement  quantities  may  be  entered   in   same  column   by  indicating  retirements  in   red. 
Totals  may  be  made  of  ballast  in  track  at  any  desired  date. 

TL^Sre^Sge'I"'oXnS  ma'J'brmade  of'ihe  form  when  use_d  as  a  continuing  record  of  ballast  inventory  or  when   used  for  recording  .ballast   changes  only,   except 
only  the  "Basic  Inventory"  of  ballast  and  the  quanf  " 


'  other  designati 


feet.  The  corresponding  upper  caption 
he  cubic  yard.^  of  ballast  for  each 


reported  on   the  sheet. 


spaces  of  colu 
iiile    (length    in    feet 


10    to    18.    inclusivi 
)   recorded  on   the 


nputed 
Recording  as  a  Whole  a  Substantial  Stretch  0}  Track  on  One  Sheet  of  Form: 
U«  columns  2    and   3    for  designating  changed   portion. 
Columns  4  and  5  are  for  recording  AFE   number  and   date.  . 

Columns  6.  7  and  8  may  be  used  for  such  data  as  description  of  project 
Sbftw   the   kinds  of   ballast   in    the    upper   caption  spaces  of   colui 
Line    I    should  be    used   to  designate    (in    any  selected  descriptiv. 
standard  section. 

Show  on  line  2  and  in  appropriate  coluk.i..3  n.^ ■- , 

Enter,  in  .ucpsive  order  on   line   i   and   following   l.nes^chang«  J.  they  ^_„.    ^^,^^^^^__^  _„  ^^^ 
Additions  and  reurement  quantities  may  be  entered  in  sam**  coiu 

Totals  m.y  be  made  of  ballast  m   track  at  ^"y^gf  [^f J^^'J^„   ^.ed  as  a  continuing   record   of  ballast   in 
The  same  usage_  as  outlined  may  be   made  of^the  lorm^when  ^^^^^^^^^   -^  accordance  with  the  adopted 


continuing  record  of  ballast  inventory   —    _ 

in  accordance  with  the  adopted  standard  section   may  not  be  needed. 


Inventory"  of  ballast. 


of  ballast,  average  haul  of  ballast,  etc.  . 

Musive.  Column  9  should  record  the  total  yardage  shown  m  columns   U 
record    in    column    9    the  total  cubic  yards  of  ballast  in  the  stretch  of  1 


that   when    used    for    recording  ballast    changes 


sheet  computed   in  accordance  with  adoptrd 


only   the    ■Ba'.ic   In 


fpl    that    when    um-J    foi 


Records    and    Accounts 381 

Various  joint  cost  data  committees  composed  of  the  commission's  valuation  engi- 
neers and  railroad  representatives  continued  their  study  of  the  more  important  items 
entering  into  railroad  construction  in  an  endeavor  to  keep  informed  as  to  the  current 
trends,  and  their  reports  and  conclusions  were  circularized  among  the  carriers.  The  Joint 
Equipment  committee  completed  and  issued  its  report  entitled,  "Costs  of  Railroad  Equip- 
ment and  Machinery,"  which  contains  the  cost  data  summaries  for  all  types  of  equipment 
for  which  cost  data  have  been  published  and,  likewise,  all  tables  of  average  relationships 
of  costs  appearing  in  its  previous  reports,  thereby  giving  complete  coverage  for  the  years 
1920-1939.  The  1939  edition  of  "Railroad  Construction  Indices"  was  prepared  and  re- 
leased by  the  Bureau  of  Valuation.  Copies  of  these  reports  may  be  obtained  from  Mr. 
E.  H.  Bunnell,  vice-president.  Finance,  Accounting,  Taxation  and  Valuation  Department, 
AAR,  Washington,  D.  C. 

Court  Decisions 

There  were  no  noteworthy  decisions  by  the  U.  S.  Supreme  Court  involving  valuation 
issues  since  the  last  report  was  written. 

A  number  of  utility  cases  involving  rates  were  litigated  in  state  courts,  but  no  new 
issues  were  presented.  Many  states  are  adopting  the  continuous  inventory  system,  similar 
to  that  adopted  by  the  ICC  for  railroads,  which  has  proved  effective  in  reducing  the  time 
and  effort  required  in  making  revaluations  of  utility  properties  for  regulatory  purposes. 


Report  on  Assignment  6  (b) 

ICC  Valuation  Orders,  Reports  and  Records 

(Subcommittee  personnel  same  as  for  Assignment  6  (a)) 

Further  study  has  been  made  of  the  subject,  Forms  for  a  Record  of  Ballast  Changes. 
With  the  aid  of  suggestions  and  forms  submitted  by  members  of  the  committee  a  general 
form  has  been  developed.  Modifications  of  this  form  are  now  in  use  and  are  satisfactory. 
This  form,  designated  as  Record  of  Ballast  Changes,  is  submitted  as  Exhibit  1,  and  it  is 
recommended  that  it  be  adopted  as  recommended  practice  and  published  in  the  Manual 
as  Form  No.  1114-A,  page  11-23.1. 

The  committee  has  given  continued  study  and  consideration  during  the  year  to  the 
subject,  Study  of  Valuation  Order  No.  3  Reports  and  Records  to  Determine  if  Further 
Simplifications  Are  Possible.  While  several  suggestions  as  to  simphfications  have  been 
considered,  there  is  nothing  of  major  importance  to  be  included  in  this  report. 

The  subject.  Form  of  Order  No.  3  Reports  in  Connection  with  Joint  Projects, 
Federal-Railroad  has  been  given  continued  consideration,  but  due  to  difficulties  with 
respect  to  the  classification  of  such  property,  it  has  not  been  possible  to  develop  a 
conclusion. 


382 


Records   and   Accounts 


Report  on  Assignment  7 

Report  Upon  Changes  In,  Revisions  and  Interpretations  o£, 
ICC  Accounting  Classifications 

H.  D.  Barnes  (chairman,  subcommittee),  F.  B.  Baldwin,  S.  H.  Barnhart,  W.  C.  Bolin, 
C.  C.  Haire,  J.  H.  Hande,  R.  J.  Herring,  W.  R.  Kettenring,  Henry  Lehn,  W.  M. 
Ludolph,  O.  M.  Miles,  H.  L.  Restall,  C.  P.  Richardson,  V.  P.  Turnburke. 

Your  committee  has  continued  the  review  of  proposed  accounting  rulings  or  orders 
submitted  by  the  ICC  Bureau  of  Accounts  in  subject  form  as  outlined  in  the  Proceedings 
for  1939,  Vol.  40,  page  746.  Summaries  of  the  opinions  of  the  members  of  the  entire 
committee  have  been  furnished  by  Mr.  E.  H.  Bunnell,  vice-president,  AAR,  for  the 
following: 

ICC  Bureau 
of  Accounts 

Subject  No.  Subject 

197  Revised     Proposed  order  modifying  Investment  in  Road  and  Equipment  Account  41, 
Cost  of  Road  Purchased,  cancellation  of  Account  42,  Reconstruction  of 
Road  Purchased,  and  creation  of  new  Account  42,  Difference  between 
•  the  Investment  and  the  Money  Outlay  for  Construction  and  Improve- 
ment of  Property  Acquired. 

This    proposal    has    since    been    revised    and    is    now    before    this 
committee  for  further  consideration. 
220  Revised     Proposed  order  modifying  the  last  two  paragraphs  of  Section  2  of  General 
Instructions  in   Classification  of   Investment  in   Road  and   Equipment 
defining  "cost";  modifying  text  of  Road  and  Equipment  Account  2 J/2 
and  Note  A  to  Account  39  and  addition  of  note  to  Account  754. 
225  Revised     Proposed  order  amending  paragraph  1  of  General  Instructions  in  Classifi- 
cation   of    Investment    in    Road    and    Equipment;    modifying    text    of 
Account  701  and  adding  Note  C  thereunder. 
241  Proposed   order   modifying   the   title  and   text   of   General   Balance   Sheet, 

Account  702,  Improvements  on  Leased  Railway  Property. 
243  Proposed  "A"  case  prescribing  the  accounting  for  the  cost  of  excavation 

through  existing  embankments  to  install  bridges  or  culverts. 
245  Proposed    order    cancelling    fourth    paragraph    of    Road    and    Equipment 

Account  76,  Interest  During  Construction,  change  in  Note  B,  and  addi- 
tion  of   new   Note   E   thereunder,   cancelling   Case    177   of   Accounting 
Bulletin  No.  15. 
257  Proposed  order  modifying  paragraph  (c)  of  Section  4  of  General  Instruc- 

tions in  Classification  of  Investment  in  Road  and  Equipment  relating 
to  "cost  of  work  train  service",  by  ehminating  rent  for  carrier's  own 
equipment  used  in  construction  service. 
261  Proposed  order  modifying  texts  of  Account  21,  Grain  Elevators,  22,  Stor- 

age Warehouses  of  the  Classification  of  Investment  in  Road  and  Equip- 
ment with  appropriate  changes  in  the  Classification  of  Operating 
Revenues  and  Expenses  and  in  the  text  of  Account  70S,  Miscellaneous 
Physical  Property. 


Records    and   Accounts 383 

In  addition  to  the  above  mentioned  subjects  the  following  were  in  the  hands  of  the 
committee  for  review  at  the  time  this  report  was  prepared: 

ICC  Bureau 

of  Accounts 

Subject  No.  Subject 

247  Revised  Proposed  order  modifying  Sections  7  and  8  of  the  General  Instructions  in 
the  Classification  of  Investment  in  Road  and  Equipment,  to  provide 
that  all  retirements  of  road  property,  except  important  sections  of  the 
main  line,  or  a  branch  line,  shall  be  charged  to  operating  expenses. 

253  Revised  Proposed  order  modifying  the  Classification  of  Investment  in  Road  and 
Equipment,  and  Operating  Revenues  and  Operating  Expenses  to  pro- 
vide that  the  total  cost  of  all  additions  and  betterments  to  existing 
tracks,  except  the  installation  of  ballast  in  tracks  not  previously  bal- 
lasted, shall  be  charged  to  operating  expenses. 
258  Proposed  order  modifying  the   Classification  of  Investment  in  Road  and 

Equipment,  and  Operating  Revenues  and  Operating  Expenses  to  sub- 
stitute  the   "Group  Method"   for   the   "Unit  Method"   of   depreciation 
accounting  as  an  optional  provision. 
263  Proposed    order   modifying    the    instructions    under    General    Account    II, 

Equipment  in  the  Classification  of  Investment  in  Road  and  Equipment 
to  define  "rebuilt  equipment". 

Since  this  committee's  last  report  (Proceedings  for  1940,  Vol.  41,  pages  472  to  474), 
ICC  has  issued  the  following  orders  modifying  the  accounting  classifications: 

Order  dated  December  6,  1939,  concelling  Account  25,  Gas  Producing  Plants,  245, 
Gas  Producing  Plants  and  246  Gas  Producing  Plants — Depreciation;  making 
numerous  changes  in  certain  Income  and  General  Balance  Sheet  Accounts;  and 
modifying  Cases  196  and  221  of  Accounting  Bulletin  No.  15. 

Order  dated  January  17,  1940,  modifying  the  text  of  Account  101,  Freight  of 
the  Classification  of  Operating  Revenues  and  Operating  Expenses  by  the  addi- 
tion of  Note  G  prescribing  sub-accounts  for  payments  for  pick  up  and 
delivery  services  and  switching  services  when  performed  in  connection  with 
line  haul  transportation  of  freight. 

Order  dated  January  17,  1940,  modifying  the  answer  to  Section  (b)  of  the  answer 
to  Case  186,  Accounting  Bulletin  No.  IS  to  read,  "To  Account  2,  Land  for 
Transportation  Purposes". 

Order  dated  January  31,  1940,  effective  January  1,  1940  revising  the  minimum 
rule  in  the  Classification  of  Investment  in  Road  and  Equipment  from  .'flOO  to 
$500.  A  carrier  may  adopt  a  minimum  less  than  $500  if  it  first  files  with  the 
commission  the  amount  which  it  proposes  to  adopt. 

Order  dated  March  12,  1940,  modifying  the  text  of  Income  Accounts  503  and  536. 

Order  dated  September  30,  1940,  effective  January  1,  1941,  modifying  the  title 
and  text  of  Account  702,  Improvements  on  Leased  Railway  Property;  modi- 
fication of  item  included  in  Account  3,  Grading,  the  text  of  Account  102, 
Passenger,  the  title  and  text  of  Account  103,  Excess  Baggage,  the  text  of 
Account  108,  Other  Passenger-Train,  the  text  of  Account  775,  Accrued  De- 
preciation-Road; cancellation  of  Accounts  713,  Traffic  and  Car-service  Bal- 
ances Receivable;  759,  Traffic  and  Car-service  Balances  Payable,  and  771,  Tax 
Liability;  and  the  addition  of  new  Accounts  713,  Traffic  and  Car-service  Bal- 


384 Records    and   Accounts 

ances-Dr.,  759,  Traffic  and  Car-service  Balances-Cr.,  and  767,  Accrued  Tax 
Liability.  The  numbers  of  Accounts  766  and  767  are  changed  to  764  and  766, 
respectively;  Cases  144  and  246  of  Accounting  Bulletin  No.  15  are  cancelled 
and  the  answer  to  Case  80,  same  document,  is  modified;  and  Section  23  of 
Special  Instructions  for  Operating  Expenses  is  cancelled. 
Order  dated  October  17,  1940,  effective  January  1,  1941,  amending  Section  1  of 
General  Instructions  in  Classification  of  Investment  in  Road  and  Equipment 
and  modifying  text  of  Account  701,  Investment  in  Road  and  Equipment,  and 
adding  Note  C  thereto;  cancellation  of  Accounts  709  and  710  and  modification 
of  Accounts  708,  712  and  new  Account  709,  Temporary  Cash  Investments 
prescribed. 

In  addition  to  these  orders  the  Bureau  of  Accounts  has  released  the  following  new 
and  revised  accounting  rulings: 

Issued  January  1,  1940 

Case  A-4 — Revised.  Accounting  for  amounts  received  from  pipe  line  companies 
and  others  for  rights  to  construct  and  maintain  pipe  lines  on  a  carrier's  right- 
of-way. 

Case  A-6^ — -Revised.  Accounting  for  exchange  of  land  both  when  there  is  and  when 
there  is  not  a  cash  transaction. 

Case  A-16 — Revised.  Accounting  for  a  carrier's  liability  for  an  award  under  the 
Workmen's  Compensation  Act. 

Case  A-34- — Revised.  Accounting  for  taxes  on  jointly  used  and  jointly  owned 
property. 

Case  A-7S — Revised.  Accounting  for  loss  due  to  depreciation  of  rail  and  other 
track  material  returned  to  stock  after  having  been  leased. 

Case  A-132 — Revised.  Accounting  for  income  taxes  on  interest  on  tax  free  bonds 
assumed  by  the  accounting  company  and  income  taxes  withheld  in  payment 
of  interest  to  non-resident  aliens. 

Case  A-153.  Accounting  for  payroll  taxes  assessed  under  the  provisions  of  the 
Social  Security  Act  (or  Railroad  Unemployment  Insurance  Act)  and  the  Car- 
rier's Taxing  Act  of  1937  based  on  the  payroll  of  a  carrier's  employees  and 
added  to  the  cost  of  labor  performed  for  others  in  connection  with  joint 
facility  arrangement  and  otherwise. 

Issued  March  1,  1940 

Case  A-154.  Accounting  for  additional  fill  and  new  ballast  applied  in  raising  the 
grade  of  track  and  for  existing  ballast  material  retained  in  the  embankment. 

Case  A-15S.  Accounting  for  compensation  received  by  a  carrier  for  performance 
of  services  in  connection  with  the  administration  of  the  Railroad  Unemploy- 
ment Insurance  Act. 

Case  A-156.  Accounting  for  purchase  of  equipment  under  conditional  sale  con- 
tract which  provides  for  the  transfer  of  title  upon  performance  of  all  obliga- 
tions thereunder. 

Case  A-1S7.  Accounting  for  the  cost  of  excavation  through  existing  embankments 
to  install  bridges  or  culverts. 


Records   and   Accounts 385 

Issued  May  1,  1940 
Case  A-95.  Cancelled.  This  case  was  in  connection  with  the  accounting  for  the 

maturity  of  receiver's  certificates. 
Case  A-1S8.  Interpretation  of  Section  7  of  Special  Instructions  to  Balance  Sheet 
Accounts. 

Issued  July  1,  1940 
Case  A-29.  Cancelled.  This  case  covered  the  accounting  for  funds  deposited  with 

insurance  companies  to  insure  performance  of  contracts. 
Case  A-128.  Cancelled.  This  case  pertained  to   the  accounting  for  services  per- 
•  formed  by  one  carrier  for  another  in  lieu  of  the  continuation  of  operation  of 
trackage  rights  by  the  latter. 
Case  A-159.  Accounting  for  the  sale  of  second  hand  passenger  coaches  requiring 
repairs  to  place  them  in  serviceable  condition. 

The  Bureau  of  Accounts  by  Accounting  Series  Circular  dated  March  20,  1940, 
requires  all  steam  carriers  to  inventory  their  materials  and  suppUes  for  the  year  1940 
and  annually  thereafter  unless  otherwise  directed. 

The  effective  date  of  the  proposed  order  of  the  ICC  covering  the  accounting  for  bal- 
last (ICC  Bureau  of  Accounts  Subject  No.  232)  has  been  withheld  and  the  vice-president 
of  the  Finance,  Accounting,  Taxation  and  Valuation  Department  of  the  AAR  is  handhng 
the  negotiations  between  individual  carriers  and  the  ICC  Bureau  of  Valuation. 

During  the  year  the  F.A.T.&V.  Department  of  the  AAR  has  prepared  in  convenient 
loose  leaf  form  a  reprint  of  Accounting  Bulletin  No.  IS  corrected  to  date,  together  with 
the  "A"  cases  and  appropriate  indices. 


This  report  is  submitted  as  information  with  the  recommendation  that  the  subject 
be  continued. 


Report  on  Assignment  8 

Methods  of  Avoiding  Duplication  of  Reports  and  for  Simplifying 

and  Coordinating  Work  Under  the  Requirements  of  the  ICC 

and  Other  Public  Authorities 

F.  B.  Baldwin  (chairman,  subcommittee),  H.  D.  Barnes,  S.  H.  Barnhart,  H.  N.  Halper, 
C.  A.  Knowles,  P.  R.  Leete,  D.  O.  Lyle,  W.  S.  MacCulloch,  Louis  Wolf. 

During  the  year  your  committee  has  maintained  contact  with  those  departments  or 
committees  of  the  AAR  and  other  railroad  committees  charged  with  the  responsibility  of 
deaUng  with  those  bureaus  and  departments  of  the  government  requiring  reports  from 
railroads.  These  committees  have  presented  the  railroad  viewpoint  in  contemplated 
changes  or  expansion  of  requirements  and  have  endeavored  to  keep  the  requirements 
within  reasonable  limits,  and  where  possible  have  secured  some  simplification  or  elimina- 
tion of  those  that  are  onerous. 

On  the  other  hand,  the  information  required  by  the  Railroad  Retirement  and  Un- 
employment Insurance  acts  has  added  to  the  number  of  reports  demanded  of  railroads; 
also  the  activities  of  the  Bureau  of  Statistics  on  the  subject  of  cost  finding  have  added  to 
the  work  of  the  railroads  in  supplying  data. 

In  at  least  two  states,  the  requirements  of  the  state  commissions  are  being  met  in 
part  by  furnishing  copies  of  reports  to  the  ICC  required  under  Valuation  Order  No.  3,  in 
lieu  of  separate  reports  prepared  on  forms  prescribed  by  the  state  commission. 


386  Records    and   Accounts 

The  Corporation  Commission  of  Oklahoma,  for  many  years,  has  required  a  quar- 
terly filing  of  copies  of  roadway  completion  reports  with  sketches  or  prints  showing  work 
completed;  also,  an  accounting  statement,  by  primary  accounts,  of  the  net  expenditures 
for  the  state  as  a  whole.  For  the  past  several  years  the  commission  has  been  accepting  a 
blue  print  copy  of  the  report  on  B.  V.  Form  No.  S88-R  for  the  state  as  filed  with  the 
ICC,  in  lieu  of  the  completion  reports  and  summaries  thereof.  The  saving  of  the  expense 
of  preparing  and  fihng  copies  of  large  numbers  of  completion  reports  is  substantial. 

The  Minnesota  Railroad  and  Warehouse  Commission  in  1939,  agreed  to  accept  a 
copy  of  the  carriers'  reports  to  the  ICC  showing  equipment  changes  on  B.  V.  Form 
No.  S88-R  and  Subschedule  "B",  amended  to  give  the  total  salvage  recovered  from 
equipment  retired,  by  primary  accounts,  in  lieu  of  a  detailed  annual  report  of  the  addi- 
tions and  retirements  of  the  units  of  equipment  on  special  forms  furnished  by  the  state 
commission  for  that  purpose.  The  substitution  of  the  report  required  by  the  ICC  under 
Valuation  Order  No.  3  for  the  special  state  report  and  the  records  necessary  for  its 
preparation  has  resulted  in  a  substantial  saving  to  the  carriers. 

As  a  matter  of  information  the  text  of  the  ICC  order  dated  November  IS,  1940, 
relative  to  its  organization  schedule  and  assignment  of  work  and  functions  under  amended 
Section  17  of  the  Interstate  Commerce  Act  is  presented  as  Exhibit  2. 


This  report  is  submitted  as  information. 


Exhibit  2 

Order 

At  a  General  Session  of  the  Interstate  Commerce  Commission,  held  at  its  office  in 
Washington,  D.  C,  on  November  IS,  1940 

Section  17  of  the  Interstate  Commerce  Act,  as  amended  (U.S.C.  title  49,  sec.  17), 
and  other  provisions  of  law  being  under  consideration,  the  following  order  was  duly 
adopted: 

Ordered:  Effective  December  2,  1940,  except  as  may  be  otherwise  provided  herein, 
the  following  organization  schedule  and  assignment  of  work  and  functions  shall  be  in 
force: 

Divisions  of  the  Commission 

That  there  continue  to  be,  as  at  present,  five  divisions  of  the  commission,  known, 
respectively,  as  divisions  1,  2,  3,  4  and  S,  consisting  of  three  members  each. 

As  provided  by  section  17  of  the  Interstate  Commerce  Act,  as  amended,  each  divi- 
sion shall  have  authority  to  hear  and  determine,  order,  certify,  report  or  otherwise  act 
as  to  any  work,  business,  or  functions  assigned  or  referred  to  it  under  the  provisions  of 
that  section,  and  with  respect  thereto  shall  have  all  the  jurisdiction  and  powers  conferred 
by  law  upon  the  commission,  and  be  subject  to  the  same  duties  and  obligations. 

Each  division  with  regard  to  any  case  or  matter  assigned  to  it,  or  any  question 
brought  to  it  under  this  delegation  of  duty  and  authority,  may  call  upon  the  whole 
commission  for  advice  and  counsel,  or  for  consideration  of  any  case  or  question  by  an 
additional  commissioner  or  commissioners  assigned  thereto ;  and  the  commission  may 
recall  and  bring  before  it  as  such  any  case,  matter  or  question  so  allotted  or  assigned  and 
may  either  dispose  of  such  case,  matter,  or  question  itself,  or  may  assign  or  refer  the 
matter  to  the  same  or  another  division. 

Each  division  may  determine  the  time  and  place  for  its  conferences  and  determine  its 
order  of  business. 


Records    and    Accounts 387 

Assignment  of  Duties  to  Divisions 

That  work,  business,  and  functions  of  the  commission  be  assigned  and  referred  to 
the  respective  divisions  for  action  thereon,  as  follows: 

Division  1 

General  conduct  of  administrative  matters  not  otherwise  assigned  or  reserved,  in- 
cluding among  other  things,  work  formerly  assigned  to  the  following  committees  but 
reassigned  to  Division  1  by  the  order  of  May  8,  1939:  Salaries  and  Personnel,  Finance, 
Cooperation  with  State  Commissions,  Organization,  Building  and  Assignment  of  Space, 
Admissions  to  Practice,  Reporting,  and  Annual  Report. 

Section  20  (1)  to  (10),  inclusive,  relating  to  the  reports,  records,  and  accounts  of 
carriers,  lessors,  and  other  persons  under  Part  I. 

Section  204  (a)  (1),  (2),  and  (4);  section  220;  and  section  222  (b),  (d),  and  (g), 
so  far  as  those  sections  relate  to  reports,  records,  and  accounts  of  carriers,  brokers,  and 
other  persons  under  Part  II. 

Section  313,  relating  to  accounts,  records,  and  reports  of  carriers  and  lessors  under 
Part  III. 

Sections  1  (21),  5  (3),  6  (10)  10,  15  (11)  and  (12),  16  (8)  to  (12),  inclusive; 
20a  (11)  and  (12),  25  (h),  of  Part  I;  section  222  of  Part  II;  sections  316  (b)  and  317  of 
Part  III,  and  the  Elkins  Act,  as  amended,  so  far  as  relating  to  discovery  and  enforcement 
of  penalties  for  violations  of  provisions  of  law. 

Section  13  (3)  of  Part  I,  so  far  as  relating  to  the  institution  of  investigations  speci- 
fied in  that  paragraph,  on  the  petition  of  the  carrier  or  carriers  concerned. 

Section  304  (c),  relating  to  classifications  of  groups  of  water  carriers  subject  to 
Part  III  and  rules,  regulations,  and  requirements  relating  thereto. 

Section  204  (c)  and  section  304  (e),  so  far  as  relating  to  the  investigation  of  com- 
plaints of  alleged  non-compliance  with  provisions  of  Parts  II  and  III  hereinbefore  as- 
signed to  Division  1  or  requirements  established  pursuant  thereto. 

Matters  coming  from  the  Bureau  of  Personnel  Supervision  and  Management  under 
Executive  Order  No.  7916,  of  June  24,  1938,  and  amendatory  and  supplementary  Execu- 
tive Orders  and  matters  assigned  to  Division  1  by  the  order  of  the  Commission  of 
July  24,  1939,  amending  an  order  of  October  12,  1935. 

Matters  coming  from  the  Bureau  of  Inquiry  under  Parts  I  and  III,  the  Elkins  Act, 
and  acts  supplemental  thereto,  and  the  Clayton  Antitrust  Act,  as  amended,  and  from  the 
Section  of  Law  and  Enforcement  of  the  Bureau  of  Motor  Carriers,  so  far  as  relating  to 
the  discovery  of  derelictions  and  enforcement  of  penal  provisions  of  Part  II. 

Admission,  disbarment,  and  suspension  of  practitioners  before  the  commission,  under 
Rule  I-B  of  the  Rules  of  Practice. 

Division  2 

Section  4,  relating  to  long-and-short-haul  and  aggregate-of-intermediate  rates,  and 
relief  therefrom. 

Section  6,  except  paragraphs  (11)  and  (12),  relating  to  schedules  of  carriers  under 
Part  I,  sections  217  and  218,  relating  to  tariffs  of  common  carriers  and  schedules  of  con- 
tract carriers  under  Part  II,  and  section  306,  relating  to  tariffs  of  common  carriers  and 
schedules  of  contract  carriers  under  Part  III,  including,  among  other  matters,  applications 
thereunder,  forms  and  specifications,  and  questions  turning  upon  the  construction  or 
application  thereof. 

Section  15  (7)  of  Part  I,  sections  216  (g)  and  218  (c)  of  Part  II,  and  section 
307  (g)  and  (i)  of  Part  III,  relating  to  the  disposition  of  applications  for  suspension  of 
schedules  or  parts  thereof,  including  authority  to  institute  investigations  into  rates,  fares, 
practices,  and  charges  of  carriers  under  Parts  I,  II,  and  III,  as  ancillary  to  a  proceeding 
of  investigation  and  suspension. 

Sections  6  (11)  (b)  and  6  (12)  of  the  Interstate  Commerce  Act  and  section  11  (d) 
of  the  Panama  Canal  Act,  U.  S.  Code,  t.  49,  sec.  51,  relating  to  the  establishment,  under 
the  additional  authority  conferred  upon  the  commission  by  the  Panama  Canal  Act  of 
proportional  rates  to  or  from  ports,  and  through  rail  and  water  arrangements  in  foreign 
commerce. 

Section  19a,  relating  to  the  valuation  of  the  property  of  carriers. 

Section  20  (11)  of  Part  I  and  section  219  of  Part  II,  so  far  as  relating  to  the 
authorization  of  released  rates  and  ratings. 


388 Records   and   Accounts ^_ 

Sections  3(2),  223,  and  318,  so  far  as  relating  to  the  prescription  of  rules  governing 
the  delivery  of  freight  and  the  settlement  of  .rates  and  charges,  and  to  prevent  unjust 
discrimination,  under  Parts  I,  II,  and  III. 

Section  22  so  far  as  relating  to  reduced  rates  in  case  of  calamitous  visitation  or 
disaster. 

Section  304  (d)  of  Part  III,  relating  to  relief  from  the  provisions  of  that  part 
because  of  competition  from  carriers  engaged  in  foreign  commerce. 

Section  204  (c)  and  section  304  (e),  so  far  as  relating  to  the  investigation  of  com- 
plaints of  alleged  non-compliance  with  provisions  of  Parts  II  and  III  hereinbefore  assigned 
to  Division  2  or  requirements  established  pursuant  thereto. 

Standard  Time  Act  of  March  19,  1918,  as  amended,  U.  S.  Code,  t.  IS,  sees.  261-265, 
inclusive. 

Matters  coming  from  the  Board  of  Reference,  relating  to  instructions  concerning  the 
informal  consideration  of  unusual  matters  and  cases  for  which  there  is  no  governing 
precedent. 

Matters  coming  from  the  Bureau  of  Informal  Cases. 

Division  3 

Civil  Aeronautics  Act  of  1938,  approved  June  23,  1938,  U.  S.  Code,  t.  49,  sec.  643, 
so  far  as  relates  to  action  as  members  of  a  joint  board,  as  may  be  directed  by  the 
chairman  of  the  commission. 

Section  1  (9)  to  (17),  inclusive,  relating  to  switch  connections,  car-service  and 
emergency  directions  with  respect  thereto,  and  contracts  of  common  carriers  by  railroad 
or  express  companies  for  the  furnishing  of  protective  service  against  heat  or  cold. 

Section  5  (1),  relating  to  the  pooling  of  traffic,  service,  or  gross  or  net  earnings  of 
common  carriers  subject  to  the  act. 

Section  3  (S),  relating  to  requirement  of  common  use  of  terminals  and  compensation 
therefor. 

Section  6  (11)  (a)  of  the  Interstate  Commerce  Act,  and  section  11  (d)  of  the 
Panama  Canal  Act,  relating  to  the  additional  jurisdiction  over  rail  and  water  traffic  con- 
ferred upon  the  commission  by  the  Panama  Canal  Act,  U.  S.  Code,  t.  49,  sec.  51,  with 
respect  to  physical  connections  between  rail  lines  and  docks; — and  section  201  (c). 
Transportation  Act,  1920,  as  amended,  U.  S.  Code,  t.  49,  sec.  141   (c). 

Section  IS  (10),  relating  to  the  direction  of  the  routing  of  unrouted  traffic. 

Sections  IS  (13),  225,  and  314,  relating  to  fixation  of  reasonable  allowances  to  the 
owner  of  property  transported  for  transportation  services  rendered,  and  Ex  Parte  No.  11, 
The  Tap  Line  Case. 

Section  25  (a)  to  (g),  inclusive,  as  amended,  relating  to  the  installment  and  main- 
tenance of  safety  devices  by  carriers  by  railroad,  other  than  enforcement  of  penalties. 

Section  1  (21)  (other  than  enforcement  of  penalties),  so  far  as  relating  to  the 
compulsory  construction  of  new  roads  or  procurements  of  additional  facilities. 

Section  204  (a)  (1),  (2),  (3),  and  (5)  of  Part  II  so  far  as  relating  to  the  estab- 
lishment of  reasonable  requirements  for  the  safe  transportation  of  explosives  and  other 
dangerous  articles,  including  inflammable  hquids,  inflammable  solids,  oxidizing  materials, 
corrosive  liquids,  compressed  gases,  and  poisonous  substances. 

Section  204  (c)  so  far  as  relating  to  the  investigation  of  complaints  of  alleged  non- 
compliance with  provisions  of  Part  II  hereinbefore  assigned  to  Division  3  or  requirements 
established  pursuant  thereto. 

Matters  arising  under  the  Transportation  of  Explosives  and  Dangerous  Articles  Act, 
Accident  Reports  Act,  Safety  Apphance  Act,  Hours  of  Service  Act,  Locomotive  Inspec- 
tion Act,  Medals  of  Honor  Act,  Ash  Pan  Act,  Railroad  Retirement  Act  of  1937,  Carriers 
Taxing  Act  of  1937,  Railroad  Unemployment  Insurance  Act,  the  Railway  Labor  Act,  as 
respectively  amended;  the  Block  Signal  Resolution  of  June  30,  1906,  and  Sundry  Civil 
Appropriation  Act  of  May  27,  1908;  Postal  Service  Acts,  U.  S.  Code,  t.  39,  c.  6,  12,  13, 
14  and  15,  so  far  as  those  acts  relate  to  duties  of  the  Commission. 

Divisions  2  and  3  alternately,  in  monthly  rotation: 

All  cases  not  otherwise  herein  assigned  or  referred  to  another  division  or  reserved 
to  the  commission,  arising  under  Part  I,  and  aU  cases  involving  rates,  fares,  or  charges 
arising  under  Parts  II  and  HI,  which  cases  (a)  have  involved  the  taking  of  testimony  at 
public  hearings,  and  are  set  to  be  argued  orally  before  one  of  such  divisions,  or  (b)  are 
submitted  without  oral  argument,  but  which  have  involved  the  taking  of  testimony  at 
public  hearings. 


Records    and   Accounts 389 

Division  4 

Section  1  (18)  to  (20),  inclusive,  and  sections  303  (1),  309,  310,  311,  and  312,  relat- 
ing to  certificates  of  convenience  and  necessity  under  Parts  I  and  III  and  permits  under 
Part  III. 

Section  5  (2)  to  (13),  inclusive,  (other  than  enforcement  of  penalties),  and  210a  (b) 
of  Part  II,  relating  to  the  consolidation,  merger,  purchase,  lease,  operating  contracts,  and 
acquisition  of  control  of  carriers,  and  to  non-carrier  control. 

Section  5  (14)  to  (16),  inclusive,  relating  to  common  control  of  railroads  and 
common  carriers  by  water. 

Section  302  (e)  and  section  303  (b),  (c),  (d),  (e),  (f),  (g),  and  (h),  relating  to 
exemptions  of  water  carriers  from  the  provisions  of  Part  III.  Sections  20a  and  214  (other 
than  the  enforcement  of  penalties),  relating  to  the  issuance  and  approval  of  securities  of 
carriers  under  Parts  I  and  II,  and  to  the  holding  of  inter-locking  positions  as  director  or 
officer. 

Section  204  (c)  and  section  304  (e),  so  far  as  relating  to  the  investigation  of  com- 
plaints of  alleged  non-compliance  with  provisions  of  Parts  II  and  III  hereinbefore 
assigned  to  Division  4  or  requirements  established  pursuant  thereto. 

The  Uniform  Bankruptcy  Act,  as  amended,  U.  S.  Code,  t.  11,  relating  to  the  reorgani- 
zation of  corporations  subject  to  the  exercise  of  the  regulatory  powers  of  the  commission. 

Matters  arising  under  the  Reconstruction  Finance  Corporation  Act,  as  amended,  and 
under  Section  20  of  Title  II  of  the  Emergency  Relief  and  Construction  Act  of  1932,  as 
amended. 

Matters  arising  under  the  Clayton  Antitrust  Act,  as  amended  (other  than  enforcement 
of  penalties). 

Matters  arising  under  Section  22  (b)  (9)  of  the  Internal  Revenue  Code  (relating  to 
exclusions  from  gross  income)  as  amended  bv  the  Act  approved  June  29,  1939,  S3  stat. 
c.  247,  Sec.  215  (a)  p.  875. 

Division  5 

Section  203  (b),  relating  to  partial  exemption  from  the  provisions  of  Part  II,  in- 
cluding determinations  as  to  the  necessity  for  application  of  Part  II  to  transportation 
within  a  municipaUty,  between  contiguous  municipaUties,  or  within  an  adjacent  zone, 
and  the  determination  of  the  Umits  of  such  zones,  referred  to  in  section  203  (b)  (8)  and 
to  casual  transportation  operations  by  motor  vehicle,  referred  to  in  section  203   (b)    (9). 

Section  204  (a)  (1)  to  (3),  so  far  as  relates  to  reasonable  requirements  with  respect 
to  continuous  and  adequate  service  and  transportation  of  baggage  and  express  by  com- 
mon carriers,  and  to  qualifications  and  maximum  hours  of  service  of  employees  and 
safety  of  operation  and  equipment  for  common,  contract,  and  private  carriers,  but  not 
including  requirements  for  the  safe  transportation  of  explosives  and  other  dangerous 
articles. 

Section  204  (a)  (4)  and  section  211  (a)  to  (c),  relating  to  the  regulation  of  brokers 
(other  than  their  accounts,  records,  and  reports). 

Section  204  (4a),  relating  to  certificates  of  exemption  to  motor  carriers  operating 
solely  within  a  single  State. 

Section  204  (7),  so  far  as  relates  to  inquiries  into  the  management  of  the  business  of 
motor  carriers  and  brokers  and  persons  controlUng.  controlled  by,  or  under  common 
control  with  motor  carriers  and  requests  for  information  deemed  necessary  to  carry  out 
the  provisions  of  Part  II. 

Section  204  (b),  relating  to  the  establishment  of  classifications  of  brokers  or  of 
groups  of  carriers  and  just  and  reasonable  rules,  regulations  and  requirements  therefor. 

Section  204  (c),  so  far  as  relating  to  investigation  of  complaints  of  alleged  non- 
compHance  with  the  provisions  of  Part  II  assigned  to  Division  5  or  requirements 
established  pursuant  thereto. 

Sections  206,  207,  and  208,  relating  to  certificates  of  public  convenience  and  necessity. 

Section  209,  relating  to  permits. 

Section  210,  relating  to  dual  operations. 

Section  210a  (a),  relating  to  grants  of  temporary  operating  authority. 

Section  212,  relating  to  suspension,  change,  revocation,  and  transfer  of  certificates, 
permits,  and  licenses. 

Section  215,  relating  to  security  for  the  protection  of  the  pubhc. 

Section  224,  relating  to  identification  of  motor  carriers. 

Section  226,  relating  to  investigation  of  motor  vehicle  sizes,  weights,  etc. 


390 Records   and   Accounts 

Any  other  matters  arising  under  Part  II  not  hereinbefore  specially  assigned  or 
referred  to  other  divisions. 

In  connection  with  the  foregoing  assignments  Division  5  is  authorized  to  institute, 
conduct  and  determine  investigations  into  motor-carrier  practices  pertaining  to  matters 
covered  by  such  assignments. 


From  such  assignment  of  work  there  shall  be  reserved  for  consideration  and  dis- 
position by  the  commission  (1)  all  investigations  on  the  commission's  own  motion  here- 
tofore entered  upon  and  hereafter  instituted,  except  as  hereinbefore  otherwise  provided, 
and  (2)  all  applications  for  rehearing,  reargument  or  other  reconsideration  and  all  cases 
before  the  commission  for  reconsideration,  except  as  hereinafter  otherwise  provided;  and 
there  shall  also  be  excepted  from  this  assignment  of  work  all  cases  submitted  prior  to 
November  1,  1940,  either  to  the  commission  or  to  a  division  thereof,  or  submitted  to  the 
commission  and  specially  referred  to  a  division,  the  various  cases  enumerated  in  any 
previous  order  of  the  commission  as  reserved  for  consideration  and  disposition  by  the 
commission,  and  all  cases  otherwise  specially  assigned. 

Unless  otherwise  ordered  by  the  commission,  any  commissioner  who  is  transferred 
from  a  division  shall  continue  as  a  member  of  such  division  for  the  disposition  of  cases 
orally  argued  and  submitted  prior  thereto,  and  those  in  which  drafts  of  final  reports  are 
under  consideration,  in  lieu  of  the  commissioner  designated  to  serve  as  a  regular  member 
of  the  division. 

Assignment  or  Duties  to  Individual  Commissioners 

That  the  following  portions  of  the  work,  business,  and  functions  of  the  commission, 
be  assigned  and  referred  to  individual  commissioners  as  herein  designated. 

To  the  Individual  Members  of  Divisions  2  and  3 

In  rotation,  in  each  month,  to  the  members  of  the  particular  division  which,  accord- 
ing to  the  assignment  heretofore  made,  is  designated  to  receive  submissions  of  rate,  etc., 
cases  in  that  month:  (a)  shortened  procedure  cases  under  Rule  of  Practice  X-A,  sub- 
mitted without  oral  argument  during  the  month;  and  (b)  shortened  procedure  cases 
assigned  for  oral  argument  during  the  month. 

To  Individual  Members  of  the  Commission 

The  commissioner  to  whom  the  Bureau  of  Traffic  reports:  (a)  special  permissions 
or  other  permissible  waivers  of  rules  regarding  schedules  of  rates,  etc.,  under  sections  6, 
217,  218,  and  306;  (b)  released  rates  applications  under  section  20  (11);  (c)  Ex  Parte 
No.  13,  with  respect  to  modifications  under  section  6  (3)  of  posting  requirements  of 
section  6  (1);  and  (d)  reduced  rates  authorizations  in  cases  of  calamitous  visitation 
under  section  22. 

The  commissioner  to  whom  the  Bureau  of  Accounts  reports:  distribution  of  carrier 
accounts  and  spreading  of  items  over  periods  of  time;  and  prescription  of  depreciation 
rates  and  modification  thereof  as  to  individual  carriers  under  sections  20  (4),  220  (c), 
and  313  (d). 

The  commissioner  to  whom  the  Bureau  of  Service  reports:  uncontested  matters  re- 
lating to  the  transportation  of  explosives  and  other  dangerous  articles. 

The  commissioner  to  whom  the  Bureau  of  Locomotive  Inspection  reports:  uncon- 
tested matters  arising  under  the  Boiler  Inspection  Act,  as  amended. 

The  commissioner  to  whom  the  Bureau  of  Safety  reports:  uncontested  matters  under 
section  25,  the  Safety  Appliance  Acts,  as  amended,  and  the  Hours  of  Service  Act,  as 
amended. 

The  commissioner  to  whom  the  Bureau  of  Finance  reports:  applications  under  sec- 
tion 20a  (12)  for  authority  to  hold  the  position  of  officer  or  director  of  more  than  one 
corporation,  when  all  the  corporations  are  part  of  the  same  system. 

The  commissioner  to  whom  the  Bureau  of  Statistics  reports:  requests  of  carriers 
for  extension  of  time  for  filing  annual  reports. 


Records   and   Accounts 


391 


The  commissioner  to  whom  the  Bureau  of  Informal  Cases  reports:  applications  and 
complaints  on  the  special  docket. 

The  commissioner  to  whom  the  Bureau  of  Inquiry  reports:  the  reference  of  cases 
involving  supposed  violations  of  law  under  Parts  I,  II  and  III  of  the  Interstate  Com- 
merce Act,  the  Elkins  Act,  or  related  acts,  to  the  Department  of  Justice  for  investigation 
and  possible  prosecution. 

The  chairman  of  the  respective  divisions:  merely  procedural  matters  in  any  formal 
case  or  pending  matter,  and  extensions  of  time  for  compliance  with  orders  (except  in 
investigations  on  the  commission's  own  motion),  in  any  such  case  or  matter,  when  the 
subject  matter  or  particular  proceeding  has  been  or  is  assigned  or  referred  to  the  divisions; 
Provided,  that  if  the  proceeding  has  been  assigned  to  a  commissioner  for  administrative 
handling  or  preparation  of  report,  such  commissioner  shall  act  on  such  procedural  mat- 
ters (including  extensions  of  time  for  compliance  with  orders)  ;  and  if  the  subject  matter 
or  particular  proceeding  has  not  been  assigned  or  referred  to  a  division  or  to  a  com- 
missioner, the  chairman  of  Division  1  may  act  on  such  matters. 

In  each  of  the  foregoing  delegations  and  assignments  to  an  individual  commissioner, 
it  is  contemplated  that  in  event  of  his  absence  or  disability  the  senior  member  of  the 
division  which  has  jurisdiction  of  the  subject  matter  or  proceeding  who  is  present  shall 
act  instead  of  the  commissioner  above  designated.  In  event  of  the  absence  or  disabihty 
of  a  commissioner  to  whom  a  proceeding  not  referred  to  a  division  has  been  assigned  for 
administrative  handling  or  preparation  of  report,  procedural  matters  in  connection  with 
such  proceeding  may  be  acted  upon  by  the  chairman  of  the  commission. 

In  respect  of  all  such  matters,  petitions  for  reconsideration  or  for  rehearing  of  any 
order  or  decision  of  an  individual  commissioner  as  herein  authorized  shall  be  initially 
passed  upon  by  the  division  to  which  the  general  subject  is  referred,  and  if  the  general 
subject  has  not  been  referred  to  a  division,  then  by  the  commission. 

All  such  petitions  shall  be  governed  by  the  general  rules  of  practice  of  the  commission. 


Bureaus  of  the  Commission 

That  the  bureaus  of  the  commission  shall  report  as  follows:  (a)  with  respect  to 
administrative  matters,  including  personnel  and  salaries  matters,  to  Division  1,  through 
the  commissioner  to  whom  the  bureau  reports;  (b)  with  respect  to  matters  of  policy  and 
functioning,  through  the  division  or  commissioner  to  whom  the  bureau  reports,  to  the 
division  or  to  the  commission,  as  set  forth  below: 


Bureaus  of  the 
Commission 
Accounts 
Administration 
Finance 
Formal     Cases:     generally 

matters   pending   before 

divisions 
Informal  Cases 
Inquiry 
Law 

Locomotive  Inspection 
Motor  Carriers 

Tariff  matters 

Finance  matters 
Personnel  Supervision  and 

Management 
Safety 
Service 
Statistics 


Traffic 
Valuation 
Water  Carriers 


Reports  Through 
Commissioner  in  charge 
Chairman,   ex   officio 
Commissioner  in  charge 
Commissioner  in  charge 

Chairman  of  division 
Commissioner  in  charge 
Commissioner  in  charge 
Commissioner  in  charge 
Commissioner  in  charge 
Commissioner  in  charge 
Commissioner  in  charge 
Commissioner  in  charge 

Chairman,  ex  officio 
Commissioner  in  charge 
Commissioner  in  charge 
Commissioner  in  charge 


Commissioner  in  charge 
Commissioner  in  charge 
Division  1 


To 

Division  1 
Division  1 
Division  4 
Commission 

Division 
Division  2 
Division  1 
Commission 
Division  3 
Division  5 
Division  2 
Division  4 

Division  1 
Division  3 
Division  3 
Commission,   except  as  to 

matters    assigned    to 

Division  1 
Division  2 
Division  2 
Commission 


392 Records   and   Accounts 

Standing  Committees  of  the  Commission 

That  there  continue  to  be,  as  at  present,  two  standing  committees  of  the  commission, 
namely  the  Committee  on  Rules  and  Reports  and  the  Legislative  committee,  consisting 
of  three  members  each,  appointed  by  the  commission,  which  shall  designate  the  chairman 
thereof.  The  chairman  of  the  commission  may  designate  a  commissioner  to  fill  a  vacancy 
on  any  committee  until  the  commission  otherwise  orders. 

Rehearings  and  Further  Proceedings 

For  the  proper  and  more  convenient  dispatch  of  business,  and  to  the  ends  of  justice, 
the  following  regulations  of  the  conduct  of  proceedings  are  adopted  (in  addition  to  those 
governing  the  parties,  as  set  out  in  the  Rules  of  Practice),  in  respect  of  rehearings, 
reconsiderations,  further  hearings,  and  supplementary  proceedings,  when  upon  the  appli- 
cation of  any  party  to  the  decision,  order,  or  requirement  of  a  division  of  the  commission. 

The  application  (and  any  supporting  or  opposing  documents)  when  submitted  shall 
be  considered  by  the  division:  if  the  division  grants  the  same,  the  application  will  stand 
as  granted  by  the  division  and  denied  by  the  commission,  and  further  proceedings  will 
be  before  the  division  and  under  its  direction.  Any  further  decision,  order,  or  require- 
ment of  the  division  shall  be  subject  to  application  for  rehearing  as  provided  in  the  act. 
If  the  division  does  not  grant  the  application,  the  application  (and  supporting  or  oppos- 
ing documents)  will  be  considered  by  the  commission,  which  in  its  discretion  will  deter- 
mine if  sufficient  reason  for  granting  a  rehearing  or  taking  any  other  action  has  been  made 
to  appear. 

By  the  Commission. 

(Seal)  W.  P.  Bartel, 

Secretary. 


Report  of  Special  Committee  on  Impact 

J.  B.  HuNLEY,  Chairman,  A.  N.  Laird  C.  P.  Schantz 

O.  F.  Dalstrom  B.  R.  Leffler  C.  E.  Sloan 

S.  F.  Grear  C.  T.  G.  Looney  F.  E.  Turneaure 

M.  HiRSCHTHAL  J.  A.  Newlin  W.  M.  Wilson 

C.  S.  Johnson  G.  E.  Robinson  Committee 

To  the  American  Railway  Engineering  Association: 

The  assignments  to  your  committee  are  as  follows: 

1.  Tests  of  short  steel  spans  with  open  floor,  together  with  effect  of  track  inequalities 
and  worn  wheels  on  such  spans. 

2.  Tests  of  steel  spans  with  ballasted  deck,  including  spans  with  pre-cast  concrete 
decks  and  poured-in-place  concrete  decks;  also  tests  on  ballasted  decks  with  timber 
floor;  particular  attention  to  be  given  to  the  damping  due  to  the  type  of  deck  and  the 
track  ballast. 

3.  Tests  of  dynamic  shear  in  steel  girder  and  truss  spans. 

4.  Tests  of  impact  in  columns  and  hangers  of  steel  spans. 

5.  Tests  of  rigid  frame  structures  of  steel  and  concrete. 

As  an  initial  step  in  the  study  of  the  above  assignments,  your  committee  asked  for 
the  approval  of  a  request  for  an  appropriation  of  $4,000  to  be  expended  during  1940  in 
the  analysis  of  valuable  test  data  at  that  time  available  to  the  committee.  This  budget 
request  was  endorsed  by  the  Board  of  Direction  and  authorized  by  the  Association  of 
American  Railroads. 

Accordingly,  work  was  started  on  the  analysis  of  stress  and  deflection  measurements 
made  by  the  Pennsylvania  Railroad  on  two  spans  on  the  main  line  at  Chester,  Pa. 
These  measurements  were  considered  especially  valuable  because  they  afforded  a  com- 
parison of  impact  effects  produced  by  steam  locomotives  and  electric  locomotives  without 
unbalanced  counterweights  in  the  drivers;  because  tests  were  conducted  at  speeds  as 
high  as  105  miles  per  hour  with  the  electric  and  90  miles  per  hour  with  the  steam  loco- 
motives; and  because  actual  stresses  were  measured  with  new  type  electric  gages  not 
available  in  earlier  tests.  In  addition  to  the  information  acquired,  the  analysis  of  these 
tests  has  been  of  very  great  value  in  clarifying  the  future  test  procedure  that  should  be 
followed  by  the  committee. 

Other  test  data  remain  to  be  analyzed  during  1941.  It  is  also  proposed  to  carry  out 
a  program  of  field  tests  during  1941  with  instruments  and  funds  made  available  to  the 
committee  by  the  Association  of  American  Railroads. 

The  committee's  report  on  the  analysis  of  the  Pennsylvania  impact  tests  follows: 

The  Special  Committee  on  Impact, 

J.  B.  HuNLEY,  Chairman. 


Bulletin  422,  January,   1941. 


393 


Description  and  Analysis  of  the  Bridge  Impact  Tests  Made 
by  the  Pennsylvania  Railroad  at  Chester,  Pa. 

TABLE  OF  CONTENTS 

Page 

1.  Digest    397 

2.  Foreword    399 

3.  Instruments   402 

Electro-magnetic  strain  gages    402 

Electrical  lateral  deflectometers   405 

Electrical  vertical  deflectometers    406 

Mechanical  vertical  deflectometers    405 

Speed  recorder   406 

Location  of  instruments   407 

4.  Spans  Tested   408 

(a)  Span  No.  6  :   S5-ft.  10  in.  girder  span   408 

(b)  Span  No.  7   :   122-ft.   girder   span    408 

5.  Locomotives  Used  in  Tests  413 

Electric  locomotive  Class  PS-A    413 

Electric  locomotive  Class  GG-1     413 

Steam  locomotive  Class  K4-S    413 

Steam  locomotive  Class  Ml-A 414 

6.  Locomotive  Characteristics  Affecting  Dynamic  Stresses  414 

The  static  weight  and  spacing  of  the  various  axles 414 

The  friction  of  its  springs  and  their  frequency  of  vibration 414 

The  period  of  its  roll  or  rotation  about  a  horizontal  axis 419 

The  period  of  its  nosing  or  rotation  about  a  vertical  axis 419 

The  condition  of  its  wheels   419 

The  counter-balancing   419 

7.  General  Test  Procedure  427 

8.  Analysis  of  Field  Records  429 

Test  records   420 

Reading  of  records  429 

Stress  and  deflection  corrections   429 

9.  Impact  Effects  as  Found  From  the  Test  Data  448 

Speed  effect 448 

Roll  effect     458 

Track  effect — electric  locomotives   463 

Combined  track  and  hammer  blow  effect — steam  locomotives  467 

Total  impacts  468 

Lateral  forces  471 

10,  Conclusions    482 

11.  Acknowledgment 483 

394 


Impact      395 


LIST  OF  PLATES  AND  DIAGRAMS 

Figures  Page 

1  General  Elevation  of  Test  Bridge  and  Test  Spans  400 

2  General  View  of  Test  Building   399 

3  Footwalk  and  Hanging  Platforms  401 

4  Electrical  Circuit  and  Details  of  Magnetic  Strain  Gage 402 

5  View  of  Indicating  Gage  on  Test  Member   403 

6  View  of  Oscillographs  in  Test  Buildings  404 

7  View  of  Electrical  Lateral  Deflectometer   405 

8  View  of  Electrical  Vertical  Deflectometer  406 

9  View  of  Mechanical  Vertical  Deflectometer   407 

10  55-ft.  10-in.  Girder  Span  and  Location  of  Test  Instruments  409 

11  Relation  of  Rail  to  Rail  Support — S5-ft.  10-in.  Span 410 

12  122-ft.  Girder  Span  and  Location  of  Test  Instruments 411 

13  Relation  of  Rail  to  Rail  Support— 122-ft.  Span  412 

14  Spring  Arrangement  and  Equahzing  System — Class  P5-A    415 

15  Spring  Arrangement  and  Equalizing  System —    "      GG-1    416 

16  Spring  Arrangement  and  Equalizing  System —    "     K4-S    417 

17  Spring  Arrangement  and  Equahzing  System —    "      Ml-A    418 

18  Unbalanced  Weights  by  Dynamic  Method  of  Analysis — Class  K4-S    423 

19  Unbalanced  Weights  by  Dynamic  Method  of  Analysis — Class  Ml-A   424 

20  Unbalanced  Weights  by  Static  Method  of  Analysis— Class  K4-S    425 

21  Unbalanced  Weights  by  Static  Method  of  Analysis^-Class  Ml-A    426 

22  View  of  Last  Word  Dial  Calibrating  Stand  428 

23  View  of  Steam  Locomotive  on  Test  Span  428 

24  Typical  Strain  &  Deflection  Record  122-ft.  Girder  Span— Class  Ml-A    430 

25  Typical  Strain  &  Deflection  Record  122-ft.  Girder  Span— Class  P5-A     431 

26  Typical  Strain  &  Deflection  Record  55-ft.  10-in.  Girder  Span— Class  K4-S. .  432 

27  Typical  Strain  &  Deflection  Record  55-ft.  10-in.  Girder  Span— Class  P5-A.,  433 

28  Speed  Effect  &  Roll  Effect— 55-ft.  10-in.  Girder  Span— Class  P5-A 457 

29  Speed  Effect  &  RoU  Effect— 55-ft.  10-in.  Girder  Span— Class  GG-1 458 

30  Speed  Effect  &  Roll  Effect— 55-ft.  10-in.  Girder  Span— Class  K4-S 459 

31  Speed  Effect  &  Roll  Effect— 55-ft.  10-in.  Girder  Span— Class  Ml-A 460 

32  Speed  Effect  &  Roll  Effect— 122-ft.  Girder  Span— Class  P5-A 461 

33  Speed  Effect  &  Roll  Effect— 122-ft.  Girder  Span— Class  GG-1 462 

34  Speed  Effect  &  Roll  Effect— 122-ft.  Girder  Span— Class  K4-S 463 

35  Speed  Effect  &  Roll  Effect— 122-ft.  Girder  Span— Class  Ml-A 464 

36  Track  Effect— 55-ft.   10-in.  Girder  Span— Class  P5-A 465 

37  "  "  "  "  "  "   —    "      GG-1 465 

38  "  "        122-ft.   Girder  Span— Class  P5-A 466 

39  "  "  "  "  "    —    "      GG-1 466 

40  Track  &  Hammer  Blow  Effect— 55-ft.  10-in.  Girder  Span— Class  K4-S 469 

41  Track  &  Hammer  Blow  Effect— 5S-ft.  10-in.  Girder  Span— Class  Ml-A 470 

42  Track  &  Hammer  Blow  Effect— 122-ft.  Girder  Span— Class  K4-S 471 

43  Track  &  Hammer  Blow  Effect— 122-ft.  Girder  Span— Class  Ml-A 472 

44  Comparison    of    Actual    Impacts    with    Design    &    Rating    Rules    Impacts — 

55-ft.  10-in.  Girder  Span— Class  P5-A   473 

45  Comparison    of    Actual    Impacts    with    Design    &    Rating    Rules    Impacts — 

55-ft.  10-in.  Girder  Span— Class  GG-1   473 


396 Impact 

Figures  Page 

46  Comparison    of    Actual    Impacts    with    Design    &    Rating    Rules    Impacts — - 

5S-ft,  10-in.  Girder  Span— Class  K4-S 474 

47  Comparison    of    Actual    Impacts    with    Design    &    Rating    Rules    Impacts — 

55-ft.  10-in.  Girder  Span— Class  Ml-A  474 

48  Comparison    of    Actual    Impacts    with    Design    &    Rating    Rules    Impacts — 

122-ft.  Girder  Span— Class  PS-A   475 

49  Comparison    of    Actual    Impacts    with    Design    &    Rating    Rules    Impacts — 

122-ft.  Girder  Span— Class  GG-1 475 

50  Comparison    of    Actual    Impacts    with    Design    &    Rating    Rules    Impacts — 

122-ft.  Girder  Span— Class  K4-S    476 

51  Comparison    of    Actual    Impacts    with    Design    &    Rating    Rules    Impacts — 

122-ft.  Girder  Span— Class  Ml-A 476 


Impact  397 


Description  and  Analysis  of  the  Bridge  Impact  Tests  Made 
by  the  Pennsylvania  Railroad  at  Chester,  Pa. 

1.  Digest 

This  report  embraces  a  description  and  analysis  of  tests  made  by  the  Pennsylvania 
Railroad  on  two  plate  girder  spans  at  Chester,  Pa.,  their  length  being  55  ft.  10  in.  and 
122  ft.  respectively.  The  tests  were  made  after  the  electrification  of  its  four  track  line 
between  New  York  and  Washington  in  order  to  determine  not  only  the  comparative 
impact  effects  of  the  two  types  of  electric  locomotives  which  would  be  operated  in  this 
territory  but  also  to  compare  the  impact  effects  of  these  electric  locomotives  with  steam 
locomotives  which  had  been  in  operation  for  some  time.  These  tests  were  conducted  at 
considerable  expense  to  the  Pennsylvania  Railroad  and  the  Special  Committee  on  Impact 
appreciates  the  opportunity  afforded  to  analyze  and  present  these  data. 

Stresses,  vertical  deflections,  and  lateral  deflections  were  measured  at  the  center  of 
each  span  under  the  four  different  types  of  locomotives  running  at  various  speeds  ranging 
from  approximately  5  m.p.h.,  which  may  be  considered  as  static  loading,  up  to  a  maxi- 
mum speed  of  105  m.p.h.  for  the  two  types  of  electric  locomotives,  80  m.p.h.  for  the 
freight  type  steam  locomotive  and  90  m.p.h.  for  the  passenger  type  steam  locomotive. 
Excellent  electrical  measuring  equipment  was  developed  for  use  in  these  tests  and  every 
care  was  taken  in  calibrating  the  instruments  and  conducting  the  tests;  hence,  it  is 
believed  the  results  can  be  accepted  with  full  confidence. 

The  results  of  these  tests  are  of  particular  interest  to  railway  engineers  generally  for 
two  reasons:  First,  because  the  highest  speeds,  which  were  considerably  higher  than  in 
any  previous  tests,  give  information  of  value  with  respect  to  present  day  speed  of 
operation,  and  second,  because  a  comparison  is  afforded  between  the  effects  of  locomo- 
tives with  and  without  the  so-called  hammer  blow  resulting  from  the  over-balance  in 
the  driving  wheels  of  steam  locomotives. 

The  total  impact  effects  produced  by  each  of  these  locomotives,  in  percent  of  the 
stresses  measured  at  a  speed  of  approximately  5  m.p.h.  are  shown  in  Figs.  44  to  51,  in- 
clusive. It  will  be  noted  that  in  general  there  was  an  increase,  at  the  very  high  operating 
speeds,  in  impact  effect  with  an  increase  in  speed  but  that  this  increase  was  moderate, 
except  for  the  electric  Class  P5-A  on  the  55-ft.  10-in.  span.  With  respect  to  comparison 
of  the  impact  effects  with  the  electric  and  steam  locomotives,  the  following  tabulation  is 
an  average  of  five  of  the  maximum  impact  effects  found  for  each  type  of  locomotive  on 
each  span: 

Average        Average  Impact 

Class       Type                                                                           Speed  Percent 
55-ft.  10-in.  Span 

PS-A       Electric    80  49 

GG-1      Electric    90  39 

K4-S       Steam  (passenger)    72  59 

Ml-A     Steam  (freight)     57  3S 

122  ft.  0-in.  Span 

P5-A       Electric    87  26 

GG-1      Electric   98  18 

K4-S       Steam  (passenger)    86  29 

Ml-A     Steam   (freight)   70  28 

It  will  be  noted  from  the  above  tabulation  and  Figures  44  to  51,  that  there  was  no 
marked  reduction  in  impact  with   the  electric  locomotives  even   though  they   had  no 


398 Impact      

unbalanced  counterweight.  However,  it  should  be  pointed  out  that  these  two  types  of 
steam  locomotives  were  exceptionally  well  balanced  and  the  hammer-blow  effect  was 
within  reasonable  limits  at  the  speeds  used.  It  can  be  seen  from  Figures  44  to  51  that 
the  total  impact  effects,  with  the  exception  of  the  electric  locomotives  on  the  5S-ft.  10-in. 
span,  are  within  the  maximum  allowance  as  provided  for  in  the  section  on  design  in  the 
present  AREA  Specifications  for  Steel  Railway  Bridges  and  AREA  Rules  for  Rating 
Existing  Iron  and  Steel  Bridges.  However,  it  should  be  kept  in  mind  that  these  tests 
represent  but  two  spans,  and  until  such  time  as  these  data  can  be  compared  with  data 
on  other  spans,  no  definite  conclusions  should  be  drawn. 

In  addition  to  these  total  dynamic  effects,  the  data  were  also  analyzed  for  the  pur- 
pose of  studying  the  magnitude  of  the  individual  impact  effects  which  make  up  the  total 
impact  effect.  These  individual  effects,  expressed  in  percentage  of  the  static  stress,  and  as 
found  from  this  study,  are  as  follows: 

1.  A  definite  increase  in  stress  due  to  speed  and  termed  "speed  effect",  was  found 
throughout  the  tests  entirely  distinct  from  the  vibrations  that  were  developed  by  the 
moving  loads.  A  probable  explanation  of  this  speed  effect  is  the  centrifugal  force  devel- 
oped by  the  locomotives  in  following  the  path  of  the  deflected  span.  The  results  of  this 
study  are  shown  in  the  upper  diagrams  in  Figs.  28  to  35  inclusive.  The  maximum  speed 
effects  generally  range  from  15  to  20  percent  on  the  55-ft.  10-in.  span,  and  10  to  13 
percent  on  the  122-ft.  span. 

2.  Measurements  frequently  showed  an  increase  in  stress  in  one  girder  with  a  cor- 
responding decrease  in  stress  in  the  other  girder  of  the  same  span,  which  is  termed  "roll 
effect"  and  is  presumably  caused  by  the  spring  borne  weight  of  the  locomotive  oscillating 
about  a  horizontal  axis.  These  results  are  shown  in  the  lower  diagrams  of  Figures  28  to  35 
inclusive.  One  outstanding  characteristic  of  the  roll  effect  is  that  there  was  a  rather  nar- 
row range  in  speed  for  each  locomotive  on  each  span,  through  which  range  the  roll 
reached  a  maximum,  decreasing  from  this  maximum  at  either  lower  or  higher  speeds. 
The  roll  effect  on  the  S5-ft.  10-in.  span  had  a  maximum  value  of  approximately  15  per- 
cent for  all  locomotives  except  the  P5-A  electric  for  which  it  was  27  percent.  On  the 
122-ft.  span,  the  maximum  roll  effect  values  were  approximately  10  percent  for  all  loco- 
motives except  the  P5-A  for  which  this  value  was  16  percent. 

3.  The  test  measurements  showed  that  vibrations  were  induced  in  the  test  spans  by 
the  electric  locomotives  even  though  there  was  no  periodic  disturbing  force  set  up  by 
unbalanced  counterweights.  This  impact  effect  has  been  termed  "track  effect"  and  is 
presumably  due  to  irregularities  in  the  track  surface  or  wheel  treads;  to  the  periodic 
effect  of  wheel  loads  coming  and  going  off  the  span,  or  to  other  conditions  of  track  and 
locomotive  that  would  tend  to  produce  a  vertical  vibration  in  the  spring  borne  weight 
of  the  locomotive  or  in  the  girders. 

These  are  the  first  comprehensive  tests  with  electric  locomotives,  making  it  possible 
to  analyze  this  track  effect  separately  from  the  out-of-balance  counterweight  effect.  The 
results  are  shown  in  Figures  36  to  39  inclusive. 

The  outstanding  characteristics  of  the  results  are  the  narrow  range  within  which  the 
test  results  were  found  to  lie  and  the  fact  that  the  track  effect  seemed  to  increase  rather 
rapidly  up  to  a  speed  of  30  to  40  m.p.h.,  particularly  on  the  SS-ft.  10-in.  span,  and  at  a 
much  less  rapid  rate  thereafter.  Maximum  track  effects,  as  to  be  expected,  were  greater 
on  the  short  span  ranging  from  10  to  15  percent,  compared  to  approximately  5  percent 
on  the  122-ft.  span. 

4.  The  combined  track  and  hammer-blow  effect  for  the  steam  locomotives  is  shown 
in  Figures  40  to  43  inclusive,  for  which  locomotives  these  two  effects  could  not  be 
separated.  Generally  these  results  follow  reasonably  well  the  theory  of  forced  vibration 


Impact 


3^9 


of  a  loaded  bridge  span  subjected  to  the  disturbing  force  of  the  unbalanced  counter- 
weights. On  the  long  span  the  maximum  impact  due  to  combined  track  and  hammer-blow 
effect  ranged  from  10  to  20  percent  and  on  the  short  span  from  25  to  30  percent.  It 
seems  possible  that  the  bridge  vibrations  set  up  by  unbalanced  counterweights  may  have 
been  broken  up,  to  a  certain  extent,  by  the  track  effect  disturbances,  and  in  the  range  of 
critical  speed,  damped  by  locomotive  spring  action. 

2.  Foreword 

With  the  electrification  of  the  Pennsylvania  Railroad,  between  New  York  and  Wash- 
ington, it  became  necessary  to  consider  the  comparative  effect  on  bridges  of  electric 
locomotives  operating  at  high  speeds,  with  steam  locomotives  of  approximately  equal 
weight.  Little  was  definitely  known  as  to  the  dynamic  forces  imposed  by  such  electric 
motors,  and  it  was  decided  to  make  a  series  of  tests  with  both  the  steam  and  electric 
locomotives  to  be  used  in  this  territory. 


Fig.  2 — General  View  ol  Test  Buildmg 

The  bridge  selected  for  this  test  was  located  at  Chester,  Pa.,  and  consisted  of 
sixteen  SS-ft.  10-in.  and  one  122-ft.  four-track,  deck  girder  spans,  with  open  decks;  see 
Fig.  1.  By  applying  the  necessary  instruments  to  the  long  span  and  one  adjacent  short 
span,  impact  data  could  be  obtained  on  a  long  girder,  and  one  of  average  length  with 
each  test  run. 

It  was  felt  that  the  desired  information  could  best  be  had  by  the  use  of  magnetic 
strain  gages  and  recorded  by  means  of  oscillographs.  A  discussion  with  representatives  of 
the  General  Electric  Company  resulted  in  an  arrangement  by  which  that  company  devel- 
oped and  furnished  the  necessary  instruments  for  recording  strains,  vertical  and  lateral 
deflections. 


;  ^s 


Impact 


401 


To  house  the  equipment,  a  building  14  ft.  by  24  ft.  was  erected  under  the  short  span 
adjacent  to  the  pier  between  the  two  test  spans;  see  Fig.  2.  Suitable  desks  for  the  opera- 
tors and  recorders,  and  tables  and  shelving  for  the  oscillographs,  relays,  meters,  etc., 
were  provided.  It  also  contained  a  dark  room  in  which  the  films  could  be  developed 
immediately   upon   their  removal  from  the  oscillographs. 

A  3-kw.,  60-cycle  electric  power  line  was  carried  into  the  test  building  for  light, 
heat,  fans,  battery  charging  transformer,  motor-generator  set,  water  cooler,  radio  and 
miscellaneous  power. 


Fig.  3 — View  of  Footwalk  and  Hanging  Platforms 


Telephone  connection  was  made  with  the  Pennsylvania  Railroad  Wilmington  ex- 
change; also  with  the  interlocking  tower  at  Baldwin,  two  miles  north  of  the  bridge,  and 
with  the  Lamokin  Street  tower  three  quarters  of  a  mile  south.  Telephone  communication 
was  also  arranged  between  the  test  building,  the  upper  deck  of  the  bridge,  and  all  gage 
positions  on  the  two  spans. 

Hanging  platforms  were  suspended  beneath  the  lung  span  at  the  center  and  quarter 
points.  A  footwalk  running  from  Pier  6  to  Pier  7  between  the  girders  under  tracks  i 
and  4  and  suitable  stairways  or  ladders  were  constructed  to  afford  access  to  the  hanging 
platforms.  See  Fig.  3.  The  roof  of  the  test  building,  as  shown  in  Fig.  2,  was  used  to 
provide  access  to  the  gages  on  the  short  span. 


402 


Impact 


All  electrical  measuring  and  recording  equipment  was  installed  and  operated  by  the 
General  Electric  Company.  Railroad  employees  were  in  charge  of  the  operation  of  the 
test  locomotives  and  other  work  on  the  track.  Watchmen  were  continuously  on  duty 
during  test  runs,  acting  as  whistle  men  and  giving  warning  of  the  approach  of  trains 
by  means  of  push  button  signals  located  at  various  points  on  the  bridge. 

3.  Instruments 

The  instruments  used  in  these  tests  were  of  the  electrical  type  and  consisted  of: 
20  electro-magnetic  strain  gages  by  which  a  continuous  record  of  the  strains  at  various 
points  could  be  obtained;  two  lateral  deflectometers  and  two  vertical  deflectometers 
located  at  the  center  of  the  spans  recording  the  lateral  and  vertical  movements  during 
each  run;  and  one  timer  from  which  the  speed  of  the  locomotives  was  obtained.  In  addi- 
tion to  these  electrical  instruments,  two  mechanical  deflectometers  were  used  which  also 
recorded  directly  the  vertical  movements  at  the  center  of  the  test  spans. 

Electro-Magnetic  Strain  Gages 

The  general  principle,  by  which  strains  are  measured  by  the  electro-magnetic  strain 
gage,  is  based  on  the  fact  that  a  magnetic  circuit,  in  which  the  lines  of  magnetic  force 
must  travel  through  both  a  magnetic  material  and  an  air  gap,  has  the  major  part  of  its 
reluctance  in  that  part  of  its  path  which  is  through  the  air  gap,  even  if  the  gap  be  very 
short.  Therefore,  a  small  change  in  the  length  of  the  air  gap  will  have  a  relatively  large 
effect  on  the  total  reluctance  of  the  circuit  and  on  the  current  carried  in  the  winding  of 
the  magnets. 


Moioi—    Cqei^SfOi'or-  Se'f 


I  lOV.-A.C 


^_  /_,^    Qer-ier^oi-or-' 

^       '  I lO\y.-  2000  Cyc/e 

I    2000Cu<=le     OgOI>li»»  ^ 


,  ^^OOO  Cycle  Fil+en 
^a  I    ..      I  IZ<s<=f:f,er~ 


Balar-icir-icj 
Tranafor-mens 


2000  CLjCle  Filfsr^ 

Fiq.  ^A 

DiAqRAMMATiC   CIRCUIT  OF    MAqNETIC    STRAIM     QAqSS 


To  conneci-ior-i  "B  ' 


Appnon.  0. 005  in.  ai'f-  e^ap 


'^Ar-ma-fi. 
-PafH    cf  rr-!ciC3mei'-i<::    ■fli-j^ 
3  !m.  cjdcie    lenc^-l-H 


Fiq.  4.  s 
Schematic  cPRAWiNq  of  ome  MAqNBTic  strain  <qAqE 

(USaa  FOfS    EJTHEJS    BAUAS/CH^q    QAQE   OIS  INPlCATir^q    qAqE) 


Impact 


403 


The  complete  electrical  circuit  for  one  electro-magnetic  strain  gage,  from  generator 
to  oscillograph,  is  shown  diagrammatically  in  Fig.  4  A.  It  can  be  seen  that  the  electrical 
circuit,  in  which  the  indicating  gage  operates,  is  a  Wheatstone  bridge  through  which  the 
2,000-cycle  current  passes.  The  indicating  gage  and  one  of  the  balancing  transformers, 
connected  in  series,  form  one  side  of  the  bridge  while  the  balancing  gage  and  the  other 
balancing  transformer,  connected  in  series,  form  the  other  side  of  the  bridge.  Since  the 
two  sides  of  the  bridge  are  connected  in  parallel,  the  2,000-cycle  current  passes  through 
the  two  sides  in  an  inverse  proportion  to  the  resistance  offered  by  each  side. 

The  electro-magnetic  strain  gage,  which  can  be  used  for  either  the  indicating  gage 
or  the  balancing  gage,  consists  essentially  of  an  electro-magnet  wound  on  a  m  shaped 
core  with  an  armature  across  the  legs  of  the  core,  see  Fig.  4  B.  The  magnetic  core  is 
attached  to  one  gage  point  while  the  armature  is  attached  to  the  other  gage  point.  The 
construction  of  the  instrument  is  such  that  when  it  is  placed  in  working  position,  a  defi- 
nite air  gap  is  provided  between  the  armature  and  the  ends  of  the  magnetic  core.  When 
a  current  is  passed  through  the  coil,  a  path  of  magnetic  flux  is  set  up  through  the  core, 
and  this  passes  from  the  core  through  the  air  gap  into  the  armature,  through  the  arma- 
ture and  then  back  across  the  air  gap  and  again  into  the  core.  Since  a  very  small  change 
in  the  air  gap  greatly  varies  the  resistance  of  the  path  of  the  magnetic  flux,  the  amount 
of  current  flowing  in  the  coil  will  be  changed  accordingly. 

In  operation,  the  indicating  gage  is  attached  to  the  member  in  which  the  strain  is 
to  be  measured;  see  Fig.  5.  It  is  fastened  by  special  screws  which  are  seated  in  two 
drilled  and  tapped  holes,  the  center  of  these  holes  being  exactly  a  gage  length  apart,  in 
this  case  three  inches,  and  in  the  line  of  stress.  The  balancing  gage  working  in  conjunction 


Fig.  S — View  of  Indicating  Gage  on  Test  Member 


404 


Impact 


with  the  indicating  gage  is  not  attached  to  the  member,  but  is  located  at  some  convenient 
point  in  the  circuit. 

Since  the  change  in  the  length  of  the  air  gap  of  the  indicating  gage  is  directly  pro- 
portional to  the  change  in  the  distance  between  its  two  attaching  screws,  any  strain  in 
the  member  on  which  the  indicating  gage  is  mounted  produces  a  change  in  the  length 
of  its  air  gap.  As  previously  mentioned,  any  change  in  the  length  of  the  air  gap  greatly 
varies  the  resistance  of  the  path  of  the  magnetic  flux  and  therefore  of  the  electrical 
current  flowing  in  the  coil  itself. 

Any  strain  in  the  member,  to  which  the  indicating  gage  is  attached,  changes  the 
amount  of  current  flowing  through  its  side  of  the  Wheatstone  bridge,  but  since  the  length 
of  the  air  gap  in  the  balancing  gage  remains  constant,  the  amount  of  current  flowing 
through  this  side  of  the  Wheatstone  bridge  remains  constant.  This  variation  in  resistance 
between  the  two  sides  results  in  a  change  of  potential  in  the  Wheatstone  bridge,  and  by 
means  of  a  galvanometer  in  the  oscillograph,  can  be  indicated  on  the  record.  This  out-of- 
balance  current  from  the  Wheatstone  bridge  is  rectified  and  filtered  so  as  to  produce  a 
direct  current  before  reaching  the  galvanometer. 

The  four  oscillographs  used  in  these  tests  were  of  the  6-element  type,  that  is,  each 
oscillograph  had  6  galvanometers,  each  of  which  was,  connected  with  a  gage  or  de- 
flectometer,  so  that  a  simultaneous  and  continuous  record  of  24  strains  or  deflections 
could  be  had  for  each  test  run.  On  the  electro-magnet  of  the  galvanometer,  there  was 
mounted  a  tiny  mirror  intercepting  a  ray  of  light,  and  any  change  in  potential  in  the 
Wheatstone  bridge,  caused  by  a  variation  of  strain  in  the  member  with  the  consequent 


Fig.  6 — View  of  Oscillographs  in  Test  Building 


Impact 


405 


Fig.  7 — View  of  Electrical  Lateral  Deflectometer 


change  in  the  air  gap  of  the  indicating  gage,  produced  a  deflection,  proportional  to  the 
change  in  voltage,  in  the  magnet  and  mirror.  The  light  ray  reflected  from  the  mirror 
registered  on  a  photographic  film,  and  the  strain  gage  circuits  were  so  adjusted  that 
0.001  in.  strain  in  the  member  produced  a  change  in  position,  of  the  reflected  ray  on  the 
film,  of  1.0  in. 

For  stresses  within  the  proportional  limit,  the  unit  stress  "/"  is  equal  to  the  unit 
deformation  "A",  multiplied  by  the  modulus  of  elasticity  "£",  divided  by  the  length 


between  gage  points  "/",  or  /  ^ 


AE 
I 


Assuming  a  value  of  30,000,000  lb.  per  sq.  in.  for 


the  modulus  of  elasticity  of  steel,  a  movement  of  0.001  in.  between  the  gage  points, 
which  are  3  in.  apart,  represents  a  stress  of  10,000  lb.  per  sq.  in. 

Supersensitive  galvanometers,  having  an  average  sensitivity  of  O.lS  milliampere  per 
millimeter  deflection  of  the  light  ray  on  the  film,  were  used  for  all  strain  gage  recorders. 
Galvanometers,  having  a  sensitivity  of  1.50  milliampere  per  miUimeter  deflection  of  the 
light  ray  on  the  film,  were  used  for  all  vertical  and  lateral  deflection  recorders. 

In  addition  to  the  strain  and  deflection  records,  timing  waves  from  the  60-cycle 
power  supply  were  recorded  on  the  film  by  each  oscillograph.  The  ampUtude  of  this 
wave  was  temporarily  increased  as  the  locomotive  passed  over  trips  2,  3  and  4  placed  on 
the  rail  at  various  points  on  the  bridge  as  shown  on  Fig.  1.  All  records  were  taken  on 
film  six  inches  wide  and  five  feet  long,  an  average  of  five  runs  being  taken  on  each  film. 

An  electric  motor  and  a  gear  box  were  used  to  drive  the  oscillograph  film  holders 
through  a  jack  shaft,  the  speed  of  the  film  being  increased  or  decreased  by  shifting  the 
gears.  See  Fig.  6.  The  oscillograph  equipment  was  automatically  started  and  stopped  by 
other  track  contacts  operating  through  a  relay  system. 

Electrical  Lateral  Deflectometers 

The  electrical  lateral  deflectometers  (see  Fig.  7)  operated  on  the  principle  of  the 
seismograph,  the  weights  in  these  instruments  being  so  balanced  as  to  be  sensitive  only 
to  lateral  motion  or  to  lateral  tilt.  Any  lateral  movement  of  the  girders,  on  which  they 
were  mounted  produced  a  proportional  change  between  the  weights  and  the  case,  causing 
a  contact  arm  to  move  along  a  rheostat  which  changed  the  voltage  in  the  circuit.  The 
change  in  voltage  was  recorded  by  the  galvanometer  in  the  oscillograph.  The  circuits  of 


406 


Impact 


Fig.  8 — View  of  Lleclrical  Vertical  Deflectometer 


the  lateral  deflectometer  were  adjusted  so  that  1,000  in.  lateral  deflection  in  the  girder 
produced  a  movement  of  the  reflected  light  ray  on  the  photographic  film  of  1.0  in. 
These  instruments  were  normally  level  but  small  changes  in  level  during  the  test  run 
produced  only  a  slow  shifting  of  the  zero  line  which  did  not  interfere  in  any  way  with 
the  observation  of  the  lateral  deflection. 

Electrical  Vertical  Deflectometers 

The  electrical  vertical  deflectometers  (see  Fig.  8)  consisted  of  a  rheostat  with  a 
contact  arm.  They  were  mounted  at  the  center  of  the  spans,  with  a  wire  running  from 
the  contact  arm  to  the  ground,  tension  in  the  wire  being  maintained  by  a  coil  spring. 
Any  vertical  movement  of  the  girder  caused  the  contact  to  move  along  the  rheostat, 
changing  the  voltage  in  the  circuit,  this  change  in  voltage  being  translated  through  the 
galvanometer,  into  a  corresponding  movement  of  the  light  ray  on  the  film.  The  electrical 
vertical  deflectometer  circuits  were  adjusted  so  that  1.000  in.  vertical  movement  of  the 
girder  produced  a  movement  of  the  ray  on  the  film  of  2.0  in. 

Mechanical  Vertical  Deflectometer 

The  two  mechanical  vertical  deflectometers  (see  Fig.  9)  were  furnished  by  the  Cleve- 
land, Cincinnati,  Chicago  &  St.  Louis  Railway,  each  being  attached  to  one  girder  of  both 
spans.  Their  construction  and  method  of  operation  are  fully  described  in  AREA  Proceed- 
ings for  1936,  Vol.  37,  page  754.  As  the  records,  being  directly  inscribed  on  paper,  were 
immediately  available  after  each  run,  they  were  used  throughout  the  tests  for  the  purpose 
of  quickly  selecting  the  speed  of  subsequent  runs,  and  ascertaining  the  maximum  oscilla- 
tion and  critical  speed  of  the  particular  locomotive  used. 

Speed  Recorder 

A  synchronous  timer  was  used  to  record  the  time,  to  the  nearest  hundredth  of  a 
second,  required  for  the  locomotive  to  pass  between  trips  1  and  5  located  as  shown  in 
Fig.  1,  the  distance  between  them  being  376.7  ft. 


Impact 


407 


Location  of  Instruments 

Five  electro-magnetic  strain  gages,  one  electrical  lateral  deflectometer,  one  electrical 
vertical  deflectometer  and  one  mechanical  vertical  deflectometer  were  used  on  the  S5-ft. 
10-in.  test  span.  The  location  of  these  instruments  is  shown  in  Fig.  10.  One  of  the 
gages  was  placed  diagonally  on  the  outside  of  the  web  at  the  south  end  of  the  west 
girder,  for  the  purpose  of  measuring  the  shearing  stress,  but  due  to  high  frequency 
lateral  vibrations  in  the  web,  bending  stresses  as  well  as  shearing  stresses  were  recorded. 
These  bending  stresses  were  magnified  due  to  the  fact  that  the  air  gap  on  the  instrument 
was  at  a  distance  of  ^  in.  from  the  face  of  the  plate,  and  since  it  was  impossible  to 
determine  how  much  of  the  total  stress  was  due  to  bending,  and  how  much  to  shear, 
these  records  have  been  disregarded. 

It  should  be  pointed  out  that  both  the  electrical  and  mechanical  vertical  deflectome- 
ters  were  placed  on  the  east  girder  of  the  S5-ft.   10-in.  span,  so   that  no  record  of 


Fig.  9 — View  of  Mechanical  Vertical  Deflectometer 


408 Impact 

deflections  in  the  west  girder  was  obtained.  These  instruments  were  not  used  on  the 
west  girder  of  this  span  as  the  test  building,  which  was  directly  under  the  girder, 
interfered  with  running  the  wire  from  the  instrument  to  the  ground. 

Fifteen  electro-magnetic  strain  gages,  one  electrical  lateral  deflectometer,  one  elec- 
trical vertical  deflectometer  and  one  mechanical  vertical  deflectometer  were  used  on  the 
122-ft.  test  span.  The  location  of  these  instruments  is  shown  in  Fig.  12.  One  of  the  strain 
gages  was  placed  on  the  outside  of  the  web  at  the  south  end  of  the  west  girder,  but,  as 
in  the  case  of  the  SS-ft.  10-in.  span,  no  reliable  results  as  to  shearing  stresses  were 
obtained.  Eight  of  the  strain  gages  were  placed  on  the  top  and  bottom  cover  plates  of 
both  girders  at  the  quarter  points,  and  two  were  placed  at  the  center  of  the  span  on  the 
outstanding  leg  of  the  top  and  bottom  flange  angles  of  the  west  girder.  Since  the  results, 
obtained  from  a  preliminary  study  of  all  the  test  records,  indicated  that  the  strains 
recorded  by  these  ten  strain  gages  were  comparable  with  the  strains  recorded  by  the  four 
strain  gages,  located  at  the  center  of  the  span  on  the  cover  plates,  the  stresses  recorded 
by  these  ten  gages  have  been  omitted  in  this  report. 

4.  Spans  Tested 
Span  No.  6:  55-ft.  10-in.  Deck  Girder  Span 

This  span  consisted  of  two  girders  55  ft.  10  in.  long  overall,  and  54  ft.  center  to 
center  of  bearings,  as  shown  in  Fig.  10.  It  was  fabricated  in  1903  and  was  designed  for  a 
live  load  equivalent  to  Cooper's  E-40,  using  lower  stresses  than  present  day  allowances. 
The  capacity  of  this  span,  using  the  present  AREA  design  stresses  and  impact,  would 
be  E-SO.  The  center  line  of  track  did  not  coincide  with  the  center  line  of  span,  the  track 
being  off  center  to  the  west,  one  inch  at  the  north  end  and  two  inches  at  the  south  end. 
With  an  average  eccentricity  of  IJ^  in.,  the  west  girder  would  carry  52.5  percent  of  the 
total  load  and  the  east  girder  47.5  percent. 

The  deck  was  of  the  "open  type" ;  that  is,  the  timber  ties  supporting  the  rail  rested 
directly  on  the  girder  flanges.  The  rail  was  P.S.  130-lb.  section  and  the  location  of  the 
track  joints  is  shown  in  Fig.  11.  The  rail  was  not  uniformly  supported  by  ties,  and  the 
distance  between  the  base  of  rail  and  top  of  tie  plate  or  tie,  at  each  tie,  is  shown  in 
Fig.  11. 

Since  the  gage  length  was  three  inches,  it  was  felt  that  the  total  strain  between  the 
gage  points  would  not  be  greatly  affected  by  the  local  strains  at  rivet  holes  and  that  a 
better  comparison  of  measured  and  calculated  stress  could  be  obtained  if  the  theoretical 
stresses  were  computed  from  the  gross  moment  of  inertia  of  the  girder  section.  Deflec- 
tion is  not  materially  affected  by  local  strains  at  net  sections,  but  depends  largely  upon 
the  strains  throughout  the  span  length,  so  that  the  theoretical  stresses  and  deflections  in 
the  various  tables  have  been  computed  from  the  gross  section  at  the  center  of  the  span. 

Span  No.  7:  122-ft.  Deck  Girder  Span 

This  span  consists  of  two  girders  122  ft.  long  overall  and  119  ft.  3  in.  center  to 
center  of  bearings,  as  shown  in  Fig.  12.  It  was  fabricated  in  1903  and  designed  for  a 
live  load  equivalent  to  Cooper's  E-40.  The  capacity  of  this  span,  using  present  AREA 
design  stresses  and  impacts,  would  be  E-64. 

The  center  line  of  track,  at  both  ends  was  ^4  in.  west  of  the  center  line  of  span 
and  this  eccentricity  would  cause  a  distribution  of  live  load  between  the  west  and  east 
■girders  of  50.8  percent  and  49.2  percent,  respectively. 

As  with  span  No.  6,  the  deck  was  of  the  open  type,  with  uneven  bearing  of  the  rail 
on  the  ties.  The  play  between  the  base  of  rail  and  top  of  tie  plate  or  tie,  and  the  location 
of  the  rail  joints,  are  shown  in  Fig.  13.  (Text  continued  on  page  413) 


Impact 


409 


■J;  0-5-95 
-or  ^jjs 


^Ti-ach.  (Nor-i-H  Grid) 
^  Easr   Qii-ctisr- 


410 


Imp  act 


h-As  b.  ang/ss 


<*  Track    CSoufH  End) 
,1      ^  Wss-f-  Qlr-der- 


-^  .<  >  ^ 

Q  0  0  0  «  II  II  II 

-tit)  ^^^ 

~  in  10  ■/)  -^  ,*"s.  u 


(J  V.  N  N  IT,  nj  Q 

■^^  I  !  '  '  ' 

Oi  M   I   I  I 


0  in  10  03 

(i-  0 


s.^r;«»^' 


<»• 


'i^TracK-(NorfH   End) 
Bas-f-  dfr-der- 


'II 

[  L 

;  O' 
Lit. 

,  J 

<i.  5) 

1^1'^ 
»^ 

00  0  c  0 


Impact 413 

It  will  be  noted  that  in  this  span  the  first  cover  plate  on  both  the  top  and  bottom 
flanges  is  cut  at  the  center,  the  outer  plates  serving  as  a  spHce,  so  that,  in  computing 
the  theoretical  stresses,  the  gross  moment  of  inertia,  including  only  the  five  outer  cover 
plates  was  used,  but  for  computing  deflections,  all  six  plates  were  considered  as  part  of 
the  gross  section. 

5.  Locomotives  Used  in  Tests 

Four  locomotives  were  used  in  the  tests,  two  high  speed  electric  (Classes  PS-A  and 
GG-1),  one  steam  passenger  (Class  K4-S)  and  one  steam  freight  (Class  Ml-A).  The 
two  steam  locomotives  were  of  the  two-cylinder  type,  the  left  pin  leading  the  right  by 
90  deg.  and  with  the  eccentric  cranks  traiHng.  All  runs  were  made  without  any  additional 
equipment,  except  for  the  tenders  on  the  steam  locomotives. 

The  following  is  a  brief  description  of  these  four  locomotives  used: 

Electric  Locomotive  Class  P5-A — No.  4779 

The  rating  of  this  locomotive,  in  terms  of  Cooper's  loading,  on  the  S5-ft.  10-in. 
span  is  E51.3  for  center  stress  and  E52.6  for  center  deflection.  The  rating  on  the  122-ft. 
span  is  E40.2  for  center  stress  and  E38.6  for  center  deflection.  The  total  weight  of  the 
locomotive  in  working  order  with  tanks  filled  with  oil  and  water  is  394,950  lb.,  and 
from  individual  scale  weights  cf  the  wheels  it  was  found  that  the  left  side  carried  201,760 
lb.  or  51.1  percent,  and  the  right  side  193,190  lb.  or  48.9  percent  of  the  total. 

This  locomotive  is  of  the  2-C-2  type  with  s'x  traction  motor  armatures.  The  arma- 
ture shaft  is  geared  to  a  quill  which  drives  the  wheels  through  spring  cups.  Axles  1,  2 
and  6  are  equipped  with  SKF  roller  bearings  while  axles  3,  4,  5  and  7  are  equipped  with 
Timken  roller  bearings.  The  lateral  clearance  of  the  center  plate  on  the  front  truck  was 
3^2  in.  and  on  the  rear  truck  t^  in.  All  general  data  regarding  this  locomotive  such  as 
axle  spacing,  wheel  weights,  actual  wheel  diameters,  wheel  clearance,  equalizing  system, 
spring  arrangement  and  spring  frequencies  are  shown  in  Fig.  14. 

Electric  Locomotive  Class  GG-1 — No.  4814 

The  rating  of  this  locomotive,  in  terms  of  Cooper's  loading,  on  the  5S-ft.  10-in. 
span  is  E43.8  for  center  stress  and  E45.9  for  center  deflection.  The  rating  on  the  122-ft. 
span  is  E41.7  for  both  center  stress  and  center  deflection.  The  total  weight  of  the  loco- 
motive in  working  order  with  tanks  filled  with  oil  and  water  is  463,840  lb.  the  left  side 
weighing  232,040  lb.  or  50.0  percent  and  the  right  side  weighing  231,800  lb.  or  50.0 
percent. 

This  locomotive  is  of  the  2-C  -|-  C-2  type  with  twelve  motor  armatures.  The  arma- 
ture shaft  is  geared  to  a  quill  which  drives  the  wheels  through  spring  cups.  All  boxes 
are  equipped  with  Timken  roller  bearings.  Both  front  and  rear  unit  engine  truck  center 
plates  have  a  lateral  clearance  of  uj  in.  All  general  data  regarding  this  locomotive  such 
as  axle  spacing,  wheel  weights,  actual  wheel  diameters,  wheel  clearance,  equalizing  system, 
spring  arrangement  and  spring  frequencies  are  shown  in  Fig.  15. 

Steam  Locomotive  Class  K4-S. — No.  3843  With  Tender  No.  3511 

This  locomotive  is  of  the  4-6-2  type  and  is  used  in  high  speed  passenger  service. 
The  tender,  which  has  2-axle  trucks,  has  a  capacity  of  12,150  gal.  of  water  and  18  tons 
of  coal.  The  rating  of  this  locomotive  with  fully  loaded  tender,  in  terms  of  Cooper's 
loading,  on  the  5S-ft.  10-in.  span  is  E53.0  for  center  stress  and  E52.9  for  center  deflec- 
tion. The  rating  on  the  122-ft.  span  is  E44.7  for  center  stress  and  E43.7  for  center  de- 
flection. The  total  weight  of  the  locomotive,  without  tender,  is  314,120  lb.,  the  left  side 


414 Impact ^ 

weighing  157,600  lb.  or  50.2  percent  and  the  right  side  weighing  156,520  lb.  or  49.8  per- 
cent. The  total  weight  of  the  tender  in  working  order,  with  full  water  tank  and  coal 
bunker,  is  195,950  lb.,  the  left  side  weighing  95,530  lb.  or  48.8  percent  and  the  right  side 
weighing  100,620  lb.  or  51.2  percent.  All  data  regarding  this  locomotive  as  to  its  axle 
spacing,  wheel  weights,  actual  wheel  diameters,  wheel  clearances,  equalizing  system, 
spring  arrangement  and  spring  frequencies  are  shown  in  Fig.  16. 

Steam  Locomotive  Class  Ml-A.— No.  6718  With  Tender  No.  6711 

This  locomotive  is  of  the  4-8-2  type  and  is  used  in  high  speed  freight  service.  The 
tender,  which  has  3-axle  trucks,  has  a  capacity  of  22,100  gal.  of  water  and  31.5  tons  of 
coal.  The  rating  of  this  locomotive  with  fully  loaded  tender,  in  terms  of  Cooper's  loading, 
on  the  55-ft.  10-in.  span  is  E60.4  for  center  stress  and  E60.9  for  center  deflection.  The 
rating  on  the  122-ft.  span  is  E55.9  for  center  stress  and  E57.6  for  center  deilection.  The 
total  weight  of  the  locomotive,  without  tender,  is  387,580  lb.  the  left  side  weighing 
198,010  lb.  or  51.1  percent  and  the  right  side  weighing  189,570  lb.  or  48.9  percent.  The 
total  weight  of  the  tender  in  working  order,  with  full  water  tank  and  coal  bunker,  is 
385,070  lb.,  the  left  side  weighing  194,420  lb.  or  50.5  percent,  and  the  right  side  weighing 
190,650  lb.  or  49.5  percent.  All  data  regarding  this  locomotive  as  to  its  axle  spacing,  wheel 
weights,  actual  wheel  diameters,  wheel  clearances,  equalizing  system,  spring  arrangement 
and  spring  frequencies  are  shown  in  Fig.  17. 

6.  Locomotive  Characteristics  Affecting  Dynamic  Stresses 

The  dynamic  effect  of  any  locomotive  on  a  structure  depends  upon  the  following: 

(a)  The  static  weight  and  spacing  of  the  various  axles 

(b)  The  friction  of  its  springs  and  their  frequency  of  vibration 

(c)  The  period  of  its  roll  or  rotation  about  a  horizontal  axis 

(d)  The  period  of  its  nosing  or  rotation  about  a  vertical  axis 

(e)  The  condition  of  its  wheels 

(f)  The  counter-balancing 

(a)  While  the  spacing  and  weights  on  the  individual  axles  of  a  locomotive  primarily 
affect  the  static  live  load  stresses,  they  do  have  some  bearing  on  the  dynamic  stresses. 
The  frequency  of  the  natural  vibrations  of  any  span  will  be  lower  under  a  heavy  load 
than  under  a  hght  load,  so  that  the  synchronous  speed  of  a  locomotive,  operating  over 
any  particular  span,  depends  upon  its  weight.  This  is  particularly  important  with  two- 
cylinder  steam  locomotive,  or  any  engine  having  unbalanced  rotating  weights. 

The  static  weight  of  a  locomotive,  insofar  as  it  fixes  the  static  deflection,  would 
seem  from  these  tests,  as  will  be  shown  later,  to  have  some  bearing  on  the  dynamic 
effect.  This  action  is  apparently  due  to  the  centrifugal  force  exerted  as  the  locomotive 
follows  the  path  of  the  deflected  span. 

(b)  The  period  of  vibration  of  the  locomotive  springs  was  not  measured  in  these 
tests,  but  the  theoretical  frequency  has  been  computed  from  the  known  spring  deflection 
constants.  The  friction  of  the  springs  and  the  frequency  of  their  vibration  have  a  marked 
effect  on  the  damping  of  the  bridge  vibrations,  and  it  was  found  that  such  damping 
occurred  during  many  of  the  test  runs. 

For  the  purpose  of  estimating  the  frequency  of  vibration  of  the  sprung  weight  of 
the  locomotives  used  in  these  tests,  the  coefficient  of  spring  deflection  (required  load  in 
pounds  to  produce  one  inch  deflection  or  compression)  was  obtained  from  the  mechanical 
department  of  the  Pennsylvania  Railroad  and  the  static  deflection  under  the  spring  borne 
weight  on  the  axles  and  the  corresponding  frequency  of  vibration  for  each  spring  or  axle 

(Text  continued  on  page  419) 


in 

Q. 

(n 
(f) 

< 

IT 


X  1^5 

1 

0  >^ 

5' 

^ 

in 

0 

s 

^ 

Hi 

w 

cy 

w 

fVl 

(^ 

^^1 

^s 

K 

1^ 

0 

C) 

(?> 

<i\ 

<^ 

m 

tfl 

^ 

^ 

\^ 

^ 

^■Q    f'i^ 

0 

0  Ci 

0( 

Oi 

P:s  ^ 

^ 

'^ 

UC  V) 

IT) 

OJ 

N 
■^ 

5 

^ 

^H  -^ 

1^ 

1 

0 

15 

0 

0 
0 

§ 

Ci 

^ 

Sii 

1 

Ci- 
vs 

^ 

[^ 

s  ^ 

1 

k 

in 

UJ,,  lU 

•fJ 

^H^ 

r) 

A 

:)-^^ 

1^ 

0 

0 

0 

0 

i: 

0 

OJ 

<* 

IS 
0\* 

5 

(\j 

Vi 

J     0 

vl 

Q)     io 

w 

(\J 

(y 

(U 

(\i 

C 
0 

f^ 

1 

•^ 

1 

~ 

t^ 

^ 

VS 

W5 

1 

0 

U 

ti 

UJ 

?-5 

Ul^ 

z 

uJ 

Q<:<2 

J 


0 


0^ 


"D.^-St.  "  0)-+- 


t;  II   II   II   II 


"J    r>     OS 


>Q'^5 


C       ^ 


^1  -So 

Wis 


>oi 


~2tP^?)fJ 


0  t.A?t;5,k 


b    ''   II II  II 11 
^     I 


,0  fi..^j)^.^^ 


,^^ 


I 

en 

in 

< 

10  J 

-U 

h 

.     0 
0 

u 

0 

J 


1^ 

^     J 
?     < 


i;;    Q    ^^   fi   t^  ^ 

"n      Jf     ^     Q-    K)     -• 

*?    I    (\j   fti   Y 


.OOP 

!^      ^S     0^     ^ 


03 


•     N     OJ     t\J     ^ 

R"  >  2-  "^    ■ 


>-      irv  Ci 

■0    SO? 

? 

^? 

<1D 

0 

"^J- 

C^ 

5" 

0:1 

'^ 

M- 

f\J       Is 

^}- 

'^ 

u^ 

C> 

Cb 

Q 

Q 

f^  1  ^ 

1^ 

(VJ 

Ci 

*^ 

C\J 

(y 

cy 

cu 

C 

! 
1 

^  lA 

fs 

0 

vs 

^ 

0 

0 

0 

«1 

0 

0^ 

0 

ifi 

?i 

1^ 

,5  5 

0 

10 

Its 

> 
Q 

^ 
^ 

0 

^ 

u^  ^ 

t-y 

-V 

0 

c^ 

^ 

^J- 

5" 

w 

^ 

^ 

(\i 

<n 

^ 

1^ 

N 

^3 

M- 

(\l 

m 

1^ 

<o 

1^ 

"^ 

~~ 

01 

OJ 

Oj 

t\J 

(\j 

<\i 

~" 

~^ 

?^ 

8 

? 

0 

§ 

0 

0 

0 

5 

e, 

0 

>^ 

i-^^T 

/ 

ifi 

<\J 

<n 

\> 

^ 

^ 

IT) 

^ 
^ 

1^ 

^ 

^ 

"1 

in 

0     ^ 

-0 

I 

^J 

^ 

Q 

0  1  Q 

c^ 

0 

0 

0 

0, 

C) 

C\ 

^ 

IV 

^i 

0      Q 

c^ 

y 

f^ 

i.^ 

Oi 

0 

<.^ 

■J 

'5^ 

\f      N 

N 

N 

N 

N 

N 

V 

•sj- 

So* 

c^ 

oi 

n" 

N~ 

N 

N" 

n" 

N" 

cy 

cy 

^ 

^ 
(j^ 

1 

j 

1 
1 

8 

0^0 

0? 

§ 

0 

OJ 

0  0 

^iaJ 

l^!M 

o'o 

N|f\) 

I 
0  0  ,Q  ,Q 

8  ^ 

3: 

S'S 

^O^jtJ) 

N 

JJ 

K" 

OJ 

N' 

(y■'^■' 

(jjV 

aj>" 

§ 

0' 

S-9 

t\!     (0 

1 

1 

1 

1 

1        1 

uj     ^5- 

' 

j 

1 

1 

i 

AJ(\J 

w 

«3 

<M 

ID 

c\i 

<c 

nj 

«0 

ty 

"U 

(yoo 
i 

cu 

cu 

nj  01 

^'^^, 

1 

?y 

^1 

1 
i 

^ 

HI 

u 

Q 

0 

Q 

0 

Cs 

0 

Q 

0 

Ci 

1 

^ 

0 

^ 

«i 

IV 

1        1 

nJli^ 

1 

-jiQ 

j 

x5 

- 

CVl 

f^ 

M- 

"i 

15 

N        03 

1) 

u 

^S 

^ 

1   1 

0    "^ 

I-  ^ 


5)   ■« 


5    "u  -^ 

I 


c 

"«i 

<ll 

«i 

J 

1 

1 

H 

^T 

Cv 

Cl 

c^ 

0 

Ol 

<\\ 

0 

1^ 

<5\ 

M    I 


2^ 

'^      ^    (Si      Q" 


t<^    ")|VS-^-^ 


If)      0^ 


y    5    ^ 


O      ^S 


si- 


Y^^-^ 


<0      N 

1        I 

in 

1 

1        1 

^5 

1 
Q 

In 

0     vs 


ur  ":;"  rii 


I 


o^    IS 


^  ^  s 


In"  03" 

I  I 

I  I 

I  I 


"A 


(Ti  ^<0- 


0  si? 


I- (r 


1^     \r 


<\J      tvj      Ci 


V3      Q 


>. 

^ 

§1 

^ 
^ 

0\ 
(vj 

s 

(y 

(vi 

lc§  ]f) 

or. 

^ 

1^ 

fn 

0 

1 

1 

<fCi    !»4 

0) 

0| 

C> 

C> 

0) 

Q 

0 

k; 

^   «> 

> 

3     - 

ur 

V) 

T 

(1 

5 

5- 

t 

■K 

ni 

?J 

1- 

^M 

Q 

^ 

"^ 

^ 

^ 

(\i 

^ 

1' 

1 

K 

rC 

0 
151 

0 

(\i 

in 

"n 

^ 
P 

(nk   Q- 

■+ 

In 

•n 

In 

V 

^j 

N 

0    ^ 

>< 

^J 

H 

*J 

(,^ 

^ 

Oi 

0 

(> 

0 

L^ 

cf 

lO 

v^ 

•.^ 

c^ 

Q 

CN 

0 

;> 

^ 

^ 

^^ 

M- 

Cl 

c^ 

!" 

I)  "J 

u; 

(T; 

in 

in 

in 

^•- 

^l" 

« 

K 

miiiii 

5 
^ 

^^ 

^ 

^ 

M- 

"n 

^r 

^^ 

IVUu 

r. 

0 

i 

0 
OJ 

0 

o 

IX) 

fe 

■i 
Pi 

(M 

oi 

nj 

- 

(VJ 

^ 

NT 

V 

s 

~j    v^ 

ly 

*.\ 

\) 

(V    p 

-J 

f^J 

nj 

01 

0] 

fM 

■1 

•| 

(^ 

^ 

fy 

^jty 

^1}] 

,^1 

t 

m 

in 

m 

u 

Pi 

UJ 

k 

M 

ii_ 

•r\) 

(\J 

on 

r 

) 

c 

in 

>* 

^ 

vs 

1 

3 

[ 

I 

•si- 
)C 

(n 

< 

J 
U, 

.  uJ 
a> 

0 
0 

u 

0 

J 


Id      H 


5 

u 

(T 

tn 
> 

7 

U) 

<^ 

fV^ 

0- 

(V^ 

7 

< 

.N 

z 

J 
< 

Q! 

CY 

tL 

lU 

-J 
0 

N 

II  -J 


u   in\^ 
-^    ^-^ 

t5..?"j" 

■fin 

hi 

^    3 .: 
■jQintn 


;0)    ,   II 


U 


i  f- 

in   1 

in   iLi 


J 
nU 


2 

h 
in 
>- 


(IT  III 

h 

0 

0    Q. 

u  (n 

0 


z 
< 

(y  z  z 


OS"^^ 


»<^. 


<i 


0 


Impact 419 

was  then  computed.  The  static  deflection  of  the  total  sprung  weight  of  the  locomotive 
and  the  corresponding  frequency  of  the  spring  group  was  then  computed  by  using  the 
sum  of  the  coefficients  for  each  spring  or  axle.  This  method  assumes  that  the  equaUzing 
system  will  adjust  the  axle  loads  so  that  there  will  be  a  uniform  static  deflection  of  the 
locomotive. 

The  theoretical  frequencies  of  the  locomotive  springs  are  given  in  Figs.  14  to  17, 
inclusive. 

(c)  While  the  magnitude  of  the  roll  of  the  locomotive,  or  the  transfer  of  weight 
from  one  rail  to  the  other,  could  be  obtained  from  the  stress  readings  in  the  two  girders 
of  one  span,  no  instruments  were  available  for  measuring  the  period  of  this  roll.  It  is 
hoped  that  this  information  can  be  obtained  in  future  tests  as  it  may  help  to  establish 
some  relation  between  speed  and  the  amount  of  roll,  and  it  is  one  of  the  factors  affecting 
the  nosing  force. 

(d)  What  is  said  as  to  the  rolling  of  the  locomotive,  applies  equally  to  the  nosing 
or  weaving  from  side  to  side.  This  movement  is  probably  periodic  and  may  produce 
lateral  stresses  of  such  magnitude  that  they  can  not  be  disregarded.  That  this  force  was 
quite  large,  in  these  tests  at  least,  is  apparent  from  the  measured  lateral  deflection  of 
the  spans. 

(e)  Irregularities  in  the  wheel  treads  or  their  eccentric  mounting  produce  vertical 
forces  when  the  locomotive  is  in  motion  and  the  same  effect  may  be  caused  by  inequali- 
ties in  the  surface  of  the  rail.  These  forces  have  a  relatively  greater  effect  on  short  spans 
than  on  long  spans. 

(f)  An  important  dynamic  effect  from  a  locomotive  is  due  to  the  centrifugal  forces 
set  up  by  the  unbalanced  weights  on  its  drivers.  In  these  tests  such  forces  occurred 
only  with  the  steam  engines,  as  there  were  no  unbalanced  rotating  weights  on  the  wheels 
of  the  electric  locomotives. 

This  unbalanced  condition  of  the  steam  locomotives  is  frequently  referred  to  as 
overbalance  and  consists  of  weight  added  to  the  wheels  to  partially  counteract  the  effect 
of  the  reciprocating  parts,  which  consist  of  the  piston,  cross-head,  union  Hnk  and  a  part 
of  the  main  rod.  The  necessary  information  required  for  the  analysis  of  the  counter- 
balancing of  these  locomotives  was  furnished  by  the  mechanical  department  of  the 
Pennsylvania  Railroad  and  is  given  in  Tables  1  and  2. 

In  calculating  the  centrifugal  force  or  "hammer  blow"  produced  by  the  two  steam 
locomotives,  it  was  thought  desirable  to  compute  the  overbalance  by  two  methods  which 
are  usually  referred  to  as  the  "static  method"  and  the  "dynamic  method".  In  the  static 
method  of  analysis  the  static  weights  of  the  main  rod,  side  rods,  eccentric  crank,  eccentric 
rod,  crank  pin  and  counterweights  are  considered  but  the  transverse  moments  caused  by 
these  weights  rotating  in  different  planes  are  neglected.  In  the  dynamic  method  of 
analysis  not  only  the  weights  of  the  main  rod,  side  rods,  eccentric  crank,  eccentric  rod, 
crank  pin  and  counterweight  but  also  the  transverse  moments  due  to  their  different 
planes  of  rotation  are  considered. 

In  the  dynamic  method  of  analysis  certain  refinements  are  also  made  in  the  deter- 
mination of  the  effective  revolving  weight  of  the  main  rod,  eccentric  crank  and  eccentric 
rod.  The  motion  of  the  main  rod,  relative  to  the  locomotive,  is  of  course  rotational  at 
one  end  and  reciprocating  at  the  other.  The  equivalent  revolving  weight  of  the  crank 
pin  end  of  the  main  rod  may  be  determined  by  the  equations  for  plane  motion  of  a 
rigid  body.  Investigations  of  a  number  of  main  rods  have  shown  that  the  equivalent 
revolving  weight  is  approximately  seven-eighths  of  the  scale  weight  of  the  crank  pin 
end,  and  this  value  was  accordingly  used  in  these  analyses. 


420 


Impact 


GEJERAI.  LOCOMOTIVE  DATA 
LOCOMOTIVE  CLASS  KI4-S   (STEAM) 


Cran^  Pin  Radius • ••  Ih  In* 

Strolc*       •  28  In. 

Cyllndor  Contors 89  in. 

Driver  Clrcumferenoe    (Actual)      20.6?  ft. 

Speed  at  One  Revolution  per  Sooond 1 

(a)  Feet  per  Second 20.6? 

(b)  mles  per  Hour 3i.093 

Total  Weight' of  Engine 31U.120  l*!" 

Total  Weight  or  Full  Tender 195.960  lbs 

FRO:iT  DRIVER  (Wheel  #3) 

Weight  of  Side  Rod 161^  lbs. 

Weight  of  Side  Rod  Fit  ...  • Uo  lbs. 

Counter-weight       •«....... ii39  lbs. 

Side  Rod  Centers _.    .   .   .  76.00  in. 

Count6r.*ieight  centers  ..«•.• .•  60*50  in. 

MAIN  DRIVER  (Wheel  #*) 

Weight  of  SideRod 652  lbs. 

Weight  of  Side  Rod  Fit 66  lbs. 

Weight  of  Back  End  of  Main  Rod   (Actual) 586  lbs. 

Weight  of  Back  End  of  Main  Rod   (Corrected) 51ii  lbs. 

Weight  of  Main  Rod  Fit 75  lbs. 

Weight  of  Eccentric  Craiik I30  lbs. 

Weight  of  Eccentric  Crunk  Fit I5  lbs. 

Weight  of  Back  End  of  Eccentric  Rod    (Actual) 30  lbs. 

Weight  of  Back  Elid  of  Ecoentrio  Rod    (Corrected) •  26  lbs. 

Counter  Weight 17ljO  lb 

Side  Rod  Centers 76.00  in. 

I'Aln  Rod  Centers 89.00  in. 

Eocentric  Crank  Centers     ....    ....  96>75  In 

Counter-weight  Centers   .....................  63*00  in 

Eocentric  Crank  Length ..***  15*C't 

Eccentric  Throw 15*00 

Distajice  Center  of  Gravity  of  Eocentric  Crank 

from  Center  of  Rotation •*  10*00 


REAR  DRIVER  (Wheel  jfj) 

Weight  of  Side  Rod *  190  lbs* 

Weight  of  Side  Rod  Fit Ifi  lbs* 

Counter-^veight       *....■•*. .....••*  U65  lbs. 

Side  Rod  Centers 69*00  in. 

Counter.4Veight  Centers   ..**« .*  60. 50  in* 

RECIPROCATIIIG  WEIGHTS  (One  Side) 


■Piston  and   Piston  Rod 
Cross-Head  Shoo  and  Pi] 
Union  Link     ■    *    ■    .    . 
a&in  Rod  Front  End      . 


1*67  lbs 

faOi*  lbs 

11   lbs 

_i.7l.  lbs 

1550  lbs 


RECIPROCATING  '.VEIGHTS   BALAIICED 


Front  Driver 
Kain  Driver 
Rear  Driver 

Total 


mic  i:ethod  of 


Right  Side     Left  Side 


516 
33.2 


atic  Method  of 
Analysis 


Right  Side     Left  Side 


235 
235 

705 


235 
235 
235 
705 


,     '.Veight  of  Engine    

Reciprocating  './eights 


31U.120 
1,556 


The  weight  of  the  eccentric  crank  for  both  steam  locomotives  is  130  lb.  with  its 
center  of  gravity  10  in.  from  the  center  of  rotation  of  the  main  driver.  A  radial  line 
through  the  center  of  gravity  of  the  eccentric  crank  makes  an  angle  of  approximately 
IS  deg.  with  a  radial  line  through  the  crank  pin  and  lags  the  pin  in  rotation  in  both 
main  drivers  when  the  motion  of  the  locomotive  is  forward.  For  purposes  of  analysis  it 
was  convenient  to  divide  the  weight  of  the  eccentric  crank  into  two  components,  one 
being  parallel  to  a  radial  hne  through  the  crank  pin  and  the  other  at  an  angle  of  90  deg. 
thereto.  The  equivalent  revolving  weight  of  the  back  end  of  the  eccentric  rod  was  added 
to  the  90-deg.  component  while  the  part  of  the  crank  pin  encircled  by  the  eccentric  crank 
was  added  to  the  component  parallel  to  a  radial  line  through  the  crank  pin. 


Impact  421 


CEIERAL  LOCOnDriVE  DMA 

LoconoTi-/i;  cuss  ki-a  (steat) 


Crank  Pin  Radlu 15  In. 

Strolce       30  In. 

Cyllnddr  Center 91.5  In. 

Driver  Circumference   fAotual) 18.^  rt. 

Speed  at  One  Revolution  per  Second  1 

(a)  Feet  per  Second 16. 58 

(b)  mles  per  Hour 12.66S 

Total  Weight  of  Engine 367,580  Ibo 

Total  Weight  of  f\ill  Tender 3e5»070  Ibt 

FROKT  DRIVER  (Wheel  #5) 

Weight  of  Side  Rod       136  lbs. 

Weight  of  Side  Rod  Fit 36  Ibe. 

Counter-weight 366  lbs. 

Side  Rod  Centers 76.625  in. 

Coimter-weight  Centers  ..•••••...........••■  60.675  In. 

HAIS  DRIVES  (Wheel  *) 

Weight  of  Side  Rod       &5  lbs. 

Weight  of  Side  Rod  Fit 108  lbs. 

Weight  of  Beck  End  of  ftoin  Rod   (Actual) 6C6  lbs. 

Weight  of  Back  Sod  of  Main  Rod   (Corrected) 531  lbs. 

Weight  of  Main  Rod  Fit 109  '-ts. 

Weight  of  Eccentrio  Crank 13°  Us. 

Weight  of  Bocentrio  Crank  Pit 20  lbs. 

Weight  of  Baek  End  of  Eccentric  Rod    (Actual) •     30  lbs. 

Weight  of  Back  End  of  Eccentrio  Rod   (Corrected) 26  lbs. 

Counter-weight •       1766  lbs. 

Side  Rod  Centers       76.625  in. 

tbln  Rod  Centers 91.500  in. 

Eccentric  Crank  Centers     IO3.OO  in. 

Counter-weight  Centers 63.25  in. 

Eccentric  Crank  Length   .....   16.77  in. 

Eocentrio  Throw IS'OO  in. 

Distance  Center  of  Gravity  of  Eocentrio  Crank 

fron  Center  of  Rotation 10.00  in. 

ll'IERIEDIAIE  DRIVER  (Wheel  #5) 

Weight  of  Side  Rod Il63  lbs. 

Weight  of  Side  Rod  Fit        36  lbs. 

Counter-weight        713  l^'s. 

Side  Rod  Centers 76.625  in. 

Counter-weight  Centers  61.000  in. 

REAR  DRIVER   (wheel  #5) 

Weight  of  Side  Rod ,  ^  j^5^ 

Wolght  of  Side  Rod  Fit 15  1^^^ 

Counter-weight ....,.«  59!,   lbs. 

Side  Rod  Centers   •••••..•.....,,,,,.,.,,  75  f^c  in 

Counterrtweight  Centers 6o!875  in! 

RECIPHOCAIING  WEIGHTS   (One  Side) 

Piston  and  piston  Rod , (^  j^s. 

Cross  Head  Shoe  and  Pin 757  lbs 

Unioii  Link 21  Ibe! 

I'^ain  Rod  Front  End *  jjc  11,3! 

Total  -TmS  lbs. 


RECIPROCAIIKC  WEIGHTS  BALANCED 


Dynamic  Uethod  of 
Analyele 

Statie  Method  of 
Analysis 

RlRht  Side 

Left  Side 

RiRht  Side 

Left  Side 

Front  Driver                        189 
i'ain  Driver                              1;5 
Intermediate  Driver           Ij^g 
Rear  Driver                            IB9 
Total                                572 

169 
22 

21ii 
2ih 
21i< 
21i. 
856 

21^4 
21i 
2U» 

Per  Cent.                     30.1j 

29.2 

Ii5.5 

45.5 

Weight  of  Enr.ino 

:     3f7.560 

:     206 

Reciprocating  W..irht6 

The  revolving  weights  may  be  considered  to  be  proportional  to  the  rotational  or 
centrifugal  forces  which  act  radially,  for  any  given  speed  of  the  locomotive,  and  for 
convenience  they  may  be  considered  as  forces  with  horizontal  and  vertical  components. 
Using  the  values  of  these  forces  with  the  crank  pin  on  the  right  side  in  an  up  position, 
moments  of  (1)  the  vertical  forces  and  (2)  the  horizontal  forces  acting  on  a  pair  of 
driving  wheels,  are  taken  about  a  vertical  plane  through  the  center  of  the  counterweight 


422 Impact 

of  the  left  wheel  of  the  pair.  Corresponding  moments  are  then  taken  about  the  vertical 
plane  through  the  center  of  the  counterweight  of  the  right  driver.  From  these  moments 
the  resultant  unbalanced  weights  (horizontal  and  vertical  components  and  their  resultant) 
in  the  plane  of  the  counterweight  are  determined. 

It  should  be  understood  that  these  calculated  values  of  resultant  unbalanced  weights 
do  not  in  any  way  show  lack  of  proper  attention  to  the  counterbalancing  of  the  loco- 
motives. It  is  common  practice  to  place  more  counterweight  in  the  driving  wheels  of  a 
locomotive  than  is  required  to  balance  the  rotating  parts  in  order  that  the  inertia  effects 
of  the  reciprocating  parts  may  be  reduced,  with  a  resulting  reduction  in  the  shaking 
forces  on  the  locomotive  frame  and  in  the  reduction  of  its  nosing  tendency.  It  is  neces- 
sary, however,  to  know  the  amount  and  position  of  the  resultant  unbalanced  weights 
in  each  driving  wheel  resulting  from  this  practice  in  order  that  proper  interpretation  may 
be  placed  on  the  measured  oscillations. 

The  general  formula  for  calculating  the  hammer  blow  produced  by  the  unbalanced 
rotating  parts  is  the  formula  for  centrifugal  force 

H.B.  =  ^r.^ 
g 

in  which 

H.  B.  =  Hammer  blow  or  centrifugal  force  in  pounds 

W  =  The   unbalanced  weight  at   crank-pin   radius  which   produces   the  hammer 
blow  in  pounds 
g  =  The  acceleration  due  to  gravity  in  feet  per  second  per  second 
r  =  The  crank  pin  radius  in  feet 
w  =  The  angular  velocity  in  radians 
(1  revolution  =  2  tt  radians) 

Upon  examining  the  oscillograph  records,  of  which  those  shown  in  Figures  24  to  27, 
inclusive,  are  typical,  it  can  be  seen  that  both  girders  are  acting  in  unison,  that  is,  the 
oscillations  in  both  the  east  and  west  girders  are  in  phase.  The  resultant  axle  hammer 
blow  was  therefore  considered  as  producing  the  oscillations  instead  of  the  resultant  ham- 
mer blow  for  each  side  of  the  locomotive.  It  should  be  understood  that  in  short  spans, 
in  which  there  are  no  cross  bracing,  the  two  stringers  or  girders  may  act  independently. 
For  such  spans  the  resultant  hammer  blow  for  each  side  of  the  locomotive  should  be 
used.  The  maximum  resultant  axle  hammer  blow,  for  the  locomotives  used,  occurs  when 
the  crank  pins  on  the  left  side  are  45  deg.  past,  and  the  crank  pins  on  the  right  side  are 
within  45  deg.  of  the  vertical. 

The  resultant  unbalanced  weights  as  computed  by  the  dynamic  method  of  analysis, 
for  each  driver  of  the  two  steam  locomotives  with  the  maximum  hammer  blow  at  one 
revolution  per  second  and  the  vertical  component  of  the  hammer  blow  when  the  pins 
are  45  deg.  from  the  vertical  (pin  position  for  maximum  effect  on  the  bridge)  are  shown 
in  Figures  18  and  19.  These  results,  as  mentioned  previously,  are  based  upon  an  analysis 
considering  the  out-of-plane  effect  of  the  revolving  parts  and  certain  refinements  in  the 
determination  of  the  effective  revolving  weights  of  the  main  rod,  eccentric  crank  and 
eccentric  rod. 

The  results  obtained  from  a  counterbalance  analysis  of  these  locomotives  by  the 
static  method  of  analysis,  in  which  the  effective  revolving  weight  of  the  main  rod  on  the 
crank  pin  is  considered  as  the  actual  scale  weight,  and  neglecting  the  90-deg.  component 
of  the  eccentric  crank  and  eccentric  rod  and  the  out-of-plane  effects  of  all  the  revolving 
parts,  are  shown  in  Figures  20  and  21.  •  (Text  continued  on  page  427) 


Imp  act 


423 


i   I 


.  .,0 


;^o 


^^  ^    '  '  '  i      J 
^-Q  tuji^njif.Ha  con 


0 


I 

0 

u 

0 

J 


5:  HI  Jin  CO 


?  0  K->:~J  r 


CC 


r 


QDi^ 


K^ 


balance    plane. 


4. 

IZiah-f-  courrher^ 
loalartce.  plane 


11, 


55? 


«^  < 

^    0 
uJ.    0 

<   u 

(0    ? 

V 


3 
i. 


13 
1^ 


424 


Impact 


1^'     ^iudQNSlOh 

^  ?l  u  1  I  I  1  I 

IU>  ,  ,  ,   ,    I 

<  0 

-Ik 

ffiU 


in 
<  in    in 

S  J    < 


in  111 

in 

< 

0)0 


0 


-(Ufll|N 
OJ^SIsO 


^3^^0 


^1^3?'^  I  ill  I 

ill      0     5'0(l)iri<U'^(\l<M|o 


uj     vj    S^ 


'III? 

lull 


V  U  u^  5  c^  -  t}-(j^ 

^i'J-  SincM^njcv) 
^  II  I  I 


0      D 
lUvO 


ho  la  nee.  plans 


fSKghrh  Cour-i+en 
k^cilance  plane 


I  I  I  I 
'111 


<  z 


3 


Impact 


42S 


oQ!::t:t 


V) 

to 
o5 


"is- 

u 


ujh;       '  I  !  ,  ^^ 


c  I 


0 


'I 

0 

u 

0 

_J 


OClNNNmj   -t: 
1     I 


y  r  Vi 


e.l  i 


ir  ■■'■ 


Lefi-  czaun+en 
balance  plans 


halance.  plane. 


S  I 


■'it    I 


^    a. 

D      0 
ZlD? 

(Q    u 


426 


Impact 


0  b 


\j  M  \y  WW  i\jk,-  I 


C 

lb 


0 


I'll 


y> 


et,  i  u-r 


Si^SI 


§1. 


0 
1 
0 

u 

0 

J 

!  I  I  I  I   ~a 

0 


(1,0  ^>  ift 


Ml 


;k  W  r 


:l.^^' 


hey 

'III 
1  '  ' 


balance  plans 


ISiqh-f  courrhsn 
balance  plane 


M 


I 

I 

e 

Ik 

0 

I 


0 

UJ.    Q 


z 

i  * 

ID     0 


Impact 427 

7.  General  Test  Procedure 

After  the  test  building,  platforms,  foot-walk,  stairs,  etc.,  had  been  erected,  the 
necessary  holes  in  the  girders  of  the  test  spans  were  drilled  and  tapped  to  provide  for 
the  attachment  of  the  instruments.  The  electrical  circuits  for  the  gages  and  deflectometers 
were  then  connected,  but  the  instruments  were  not  placed  until  they  had  been  caUbrated. 

In  calibrating  the  electro-magnetic  strain  gages,  the  air  gap  in  the  balancing  gage 
was  first  set  to  have  a  clearance  of  approximately  0.005  in.  Each  indicating  gage  was 
then  placed  on  the  calibrating  stand  and  adjusted  by  changing  its  air  gap  until  the 
galvanometer  indicated  that  the  amounts  of  current  flowing  through  the  two  sides  of  the 
Wheatstone  bridge  were  balanced.  The  air  gap  of  the  indicating  gage  was  then  changed 
by  known  increments  and  the  corresponding  deflection  was  recorded  by  the  oscillograph. 
The  change  in  the  air  gap  was  measured  by  means  of  the  "Last  Word"  dial  on  the  caU- 
brating  stand,  which  was  graduated  to  record  movements  of  1/10,000  in.  See  Fig.  22. 
The  desired  amount  of  galvanometer  deflection  per  increment  of  air  gap  change  was 
secured  by  varying  the  resistance  connected  in  series  with  the  galvanometer. 

After  the  gages  had  been  calibrated  they  were  placed  on  the  test  spans  and  a  loaded 
car  of  known  weight  was  spotted  on  the  span  in  position  for  maximum  moment  and 
readings  were  taken  with  10-in.  Berry  strain  gages,  held  along  side  the  magnetic  strain 
gages.  The  result  of  this  comparative  test  for  both  spans  is  given  below: 

Berry  Strain  Gages    Magnetic  Strain  Gages 

Stress  Stress 
55-Ft.   10-In.   Span                                                       lb.  per  sq.  in.                   lb.  per  sq.  in. 

Top — east  girder — compression    7,200  6,800 

Bottom — east  girder — tension  7,100  7,600 

Average — top  and  bottom    7,150  7,200 

Percent    variation — top    or    bottom    stress    from 

average    0.70  5.56 

Top — ^west  girder — compression   7,300  6,800 

Bottom — west  girder — tension    7,200  7,600 

Average — top  and  bottom    7,250  7,200 

Percent    variation — top    or    bottom    stress    from 

average    0.69  5.56 

122-Ft.  Span 

Top — east  girder — compression    4,500  4,900 

Bottom — east  girder — tension  4,600  4,800 

Average— top  and  bottom    4,550  4,850 

Percent  variation — top  or  bottom  from    average.  1.10  1.03 

Top — west  girder — compression  4,400  4,600 

Bottom — west  girder — tension   4,800  5,100 

Average — top  and  bottom    4,600  4,850 

Percent  variation — top  or  bottom  from  average.  4.35  5.15 

Test  runs  were  made  at  approximate  speed  variations  of  five  m.p.h.  up  to  the  maxi- 
mum speed  permissible  with  the  particular  type  of  locomotive  used.  Runs  at  intermediate 
speeds  were  then  made  with  a  view  to  carefully  checking  the  existence  of  any  relation 
between  the  recorded  dynamic  values  and  the  theoretical  values  which  had  previously 
been  determined. 

Photographs  were  taken  of  the  steam  locomotives  on  all  runs  when  the  speed 
exceeded  50  m.p.h.  These  photographs,  of  which  Fig.  23  is  typical,  included  a  marker 
showing  the  run  number  and  a  scale  board  graduated  in  feet  and  attached  to  the  rail. 
This  scale  board,  together  with  arrow  head  painted  on  the  driving  wheels  of  the  loco- 
motive made  it  possible  to  determine  the  location  of  the  crank  pins  with  respect  to  the 
center  of  the  spans. 


428 


Impact 


Fig.  22 — View  of  Last  Word  Dial  Calibrating  Stand 


Fig.  23 — ^View  of  Steam  Locomotive  on  Test  Span 


Impact 429 

All  photographic  and  oscillograph  films  were  developed  in  the  dark  room  in  the  test 
building  immediately  after  the  exposures  had  been  made.  As  soon  as  the  films  were  dry, 
they  were  properly  labeled  to  designate  the  date,  run  number,  class  and  speed  of 
locomotive  and  instrument  numbers. 

8.  Analysis  of  Field  Records 
Test  Records 

Black-hne  prints  of  all  the  test  records  were  made  from  the  oscillograph  photographic 
film  and  these  prints  were  then  bound  together  in  three  volumes  and  in  consecutive 
order,  according  to  speed,  for  each  locomotive.  Volume  I  contains  all  the  records  for  span 
number  6,  while  Volumes  II  and  III  contain  the  records  for  span  number  7. 

Since  it  would  make  this  report  too  voluminous  to  include  all  of  the  test  records, 
only  typical  records  are  included  as  shown  in  Figures  24  to  27,  inclusive.  These  volumes 
of  test  records,  as  well  as  the  Big  Four  mechanical  deflectometer  records,  are  now  on 
file  in   the  engineering  division  offices,  Association  of  American  Railroads. 

Reading  of  Records 

For  an  analysis  of  the  records  it  was  first  necessary  to  draw  base  lines  representing 
zero  stress  and  deflection.  Since  the  reflected  light  ray  was  quite  wide  in  some  cases, 
resulting  in  a  thick  stress  or  deflection  line,  it  was  decided  to  measure  all  stresses  and 
deflections  from  one  side  of  the  line,  as  shown  in  the  typical  examples,  Figures  24  to  27. 
Light  dotted  lines,  called  upper  and  lower  envelope  curves,  were  then  drawn  through 
the  peaks  of  the  oscillations.  A  soHd  line,  called  the  mean  stress  or  mean  deflection 
curve,  was  then  drawn  midway  between  the  upper  and  lower  envelope  curves.  It  should 
be  pointed  out  that,  at  very  slow  speeds,  the  mean  stress  or  deflection  curve  represents 
the  static  stress  or  deflection,  at  the  center  of  the  span,  for  the  different  positions  of  the 
locomotive  as  it  passed  over  the  span.  As  the  speed  of  the  locomotive  increases,  the 
mean  stress  curve  is  affected  by  the  speed  of  application  of  the  load  and  by  the  roll  of 
the  locomotive,  as  will  be  shown  later. 

As  pointed  out  in  AREA  Proceedings  for  1936,  Vol.  37,  page  760,  the  oscillations  in 
any  span  keep  building  up  until  they  reach  a  maximum  and  then  become  smaller.  In 
the  55-ft.  10-in.  span,  the  maximum  oscillation  at  all  speeds  occurred  at  the  time  of 
maximum  mean  stress  or  deflection.  In  long  spans  this  condition  may  not  obtain,  as  the 
oscillations  usually  reached  their  maximum  value  before  the  time  of  maximum  mean 
stress  or  deflection  when  the  speed  exceeded  the  synchronous,  and  after  that  time  when 
the  speed  was  lower  than  synchronous.  But  in  the  122-ft.  span  this  variation  was  negli- 
gible, and,  as  with  the  short  span,  the  values  of  the  oscillations  were  scaled  at  the  point 
of  maximum  mean  stress  or  deflection. 

Stress  and  Deflection  Corrections 

To  the  values  of  stresses  and  deflections,  as  first  scaled  from  the  records,  it  was 
necessary  to  make  the  following  corrections: 

(1)  Strain  Instrument  Correction. — The  center  of  gravity  of  the  "air  gap"  on  the 
magnetic  strain  gages  being  %  in-  from  the  base,  the  strains  were  recorded  on  a  plane 
which  was  %  in.  farther  from  the  neutral  axis  than  the  extreme  part  of  the  steel.  As- 
suming that  the  stress  is  proportional  to  the  distance  from  the  neutral  axis,  this  correction 
factor  amounted  to  0.972  for  the  55-ft.  10-in.  span  and  0.985  for  the  122-ft.  span. 

(2)  Mechanical  Deflectometer  Wire  Tension  Correction. — As  the  span  deflected  from 
its  initial  position,  there  was  a  corresponding  change  in  the  spring  tension,  causing  a 
change  of  stress  in  the  wire  leading  to  the  ground  weight.  This  variation  in  stress  was 

(Text  continued  on  page  434) 


430 


Impact 


Impact 


431 


i 

<^ 

i 

t^ 

h: 

>i. 

N 

0 

a:^^ 

'^ll 

s:" 

Q 

1^ 

0    y 

*o 

0     a 

rO 

UJ        h 

rt 

(y    0 

o 

Ul 

1  i 

1  I 

cv 

< 

to 

(X 

3 

o 

_J 

7      -J 

(O 

.    D  in 

cvJ 

d 

er§Q!< 

c 

i^<(jd 

7  = 

^OU 

ScvJo 

0 

p-    -J 

V 

h 

0        2 

432 


Impact 


1^ 


o     ^ 

^  2 

o4in 

(VJCbg< 

K-'  0 

-J      y 
<     0 

y    -• 

Q. 

V 

h 


Impact 


433 


434 Impact 

accompanied  by  a  proportional  variation  in  length,  and  for  the  wire  used  with  these 
instruments,  which  was  of  0.080  in.  in  diameter  actuated  by  a  spring  having  a  constant 
of  2.2  lb.,  this  correction  amounted  to  0.00279  in.  additional  deflection  for  each  inch 
deflection  of  the  S5-ft.  10-in.  span  and  0.00664  in.  additional  deflection  for  each  inch 
deflection  of  the  122-ft.  span. 

(3)  Coal  and  Water  Deduction  Correction. — The  amount  of  coal  and  water  in  the 
tenders  of  the  steam  locomotives  was  measured  and  recorded  before  each  test  run.  The 
variation  in  the  stresses  and  deflections  due  to  the  difference  in  tender  weights  was  com- 
puted and  the  scaled  values  for  each  run  were  corrected  so  that  all  of  the  values  shown 
in  the  tables  are  on  the  basis  of  full  tenders.  Since  the  tender  was  not  on  the  55  ft. 
10  in.  span  at  the  time  of  maximum  stress  and  deflection,  it  was  not  necessary  to  correct 
these  values.  The  correction  factors  for  the  122-ft.  span  were  as  follows: 

Locomotive  Class  K4-5 

Stress  in  kips  per  sq.  in.  =  0.0465  P 
Deflection  in  inches        r=:  0.00734/' 

Locomotive  Class  Ml-A 

Stress  in  kips  per  sq.  in.  ^  0.0755  P 
Deflection  in  inches        =  0.0107  P 

in  which  "P"  is  the  reduction  in  tender  wheel  loads,  in  kips. 

The  maximum  correction  for  locomotive  Class  K4-S  was  for  run  206  at  a  speed  of 
88.3  m.p.h.,  when  sufficient  water  and  coal  had  been  used  to  reduce  the  tender  wheel 
loads  by  9.05  kips,  so  that  it  was  necessary  to  add  0.42  kips  per  sq.  in.  to  the  mean  and 
maximum  stresses  and  0.066  in.  to  the  mean  and  maximum  deflections.  The  maximum 
correction  for  locomotive  Class  Ml-A  was  for  run  154  at  a  speed  of  46.2  m.p.h.  The 
reduction  in  tender  wheel  loads  for  this  run  amounted  to  9.08  kips  so  that  it  was  neces- 
sary to  add  0.69  kips  per  sq.  in.  to  the  mean  and  maximum  stresses  and  0.095  in.  to  the 
mean  and  maximum  deflections. 

The  vertical  stresses  and  deflections,  as  corrected,  are  shown  for  the  four  classes 
of  locomotives,  in  Tables  3,  4,  5  and  6  for  the  55-ft.  10-in.  span  and  in  Tables  7,  8,  9 
and  10  for  the  122-ft.  span.  In  these  tables,  the  "max'mum  stress"  or  "maximum  deflec- 
tion" is  the  sum  of  the  "mean  stress"  or  "mean  deflection"  and  the  "semi-amplitude 
stress"  or  "semi-amplitude  deflection";  this  stress  or  deflection  includes  all  of  the  dynamic 
effects  of  the  moving  load  except  the  roll  effect. 

It  should  be  kept  in  mind  that  the  measured  stresses  represent  the  average  strain 
over  the  gage  length  of  three  inches  and  it  is  probable  that  they  are  lower  in  intensity 
than  if  they  had  been  measured  on  a  shorter  gage  length  at  a  section  through  the  rivet 
holes.  These  measured  stresses  therefore  should  not  be  considered  as  the  maximum 
stress  concentration  which  may  occur,  but  they  do  indicate  the  variation  in  unit  stress 
under  different  conditions  of  loading. 

It  will  be  noted  that  for  most  of  the  runs,  the  unit  stress  in  the  top  flange  is  lower 
than  that  in  the  bottom  flange.  This  may  be  due,  in  part,  as  pointed  out  above,  to  the 
fact  that  on  the  tension  flange,  the  gages  were  affected  more  by  the  net  section  than  the 
gages  on  the  compression  flange.  By  referring  to  the  comparative  tests  made  with  the 
10-in.  Berry  gages  and  the  electro-magnetic  gages  under  a  stationary  car  of  known  weight, 
as  given  on  page  427  it  can  be  seen  that  the  average  of  the  top  and  bottom  electro- 
magnetic gage  reading  agrees  closely  with  the  average  of  the  Berry  gage  readings.  For 
this  reason  it  was  felt  that  more  reliable  impact  percentages  would  be  secured  if  the 
average  of  the  top  and  bottom  stresses  were  used.  Another  factor  contributing  to  this 

(Text  continued  on  page  447) 


Impact 


435 


Id 

^^ 

a 

f? 

3 

tn 

t; 

e 

a 

i 

sJ 

3 

£3 

^3 

g 
& 

g 

a 

^  8  g  w  <I 


111- 


11  ^ 


gii 


a. 


la|K^8 


8g» 

o  o  o 


KS&C^K 


o  o  o  o 


o  o  <i  o 


>  O  O         O  Q  O  O  O 


ooooo   ooooo   ooooo 


o  Q  ir\o  o  o 
o  o  o  o  o  o 

If ^§81 


o  o  o  o 
o  o 


O         O  O  O  O  ( 


i^ooQiA  ii^Q^'^c>o  oooifvo  QOiAOir\  <20<3<34>  QM>QQ"^P 
ooQt*-'*jirv  «}\Qt— CQCQ  Os(H«-icqo  oocQcQir\  mS  iti^O  ^o-O  hj  <o  -:i  a>  o  rf\ 
ir\3-^3-a^      J  J_:T33      -auMTvj  ir\       UMr\33K\      rc\r<\r<^KM<\      K^K^3K^■^  ir\ 


ooooo 

so  ITi'iS  ^  so 


o  o  o  o  o  o 


ooooo   ooooo   ooooo   oooooo 


QOOOQ         ooooo         mOQlTtOO 

Sl^S<iS3     a^S^R     S33S,!?!T!^ 


JOOOO         OOOOO 


O  O  Q  O  < 

w  CO  *  or  - 

o  o  o  d  d 


o  o  o       o  < 


saaas  sss-!?® 


SSSS€S 


>  o       o  o  o  < 


)Oooo      ooooo 


§o  o 
c?o  o 


>  O  lAO  O 

J^333 

?  o  d  o  o 


OOOOO   oooooo 

OlTvQOO         OOOJNO         <3  Q  Q  ^O  Q         QQmu>Ol£\ 
33 3-3      3  if\3 i^H\      t<\K\H\te\t<\       K\»r\3  k\3 3 


>  o  o  o  o      o  o  < 


)OOoo      oooooo 


SSa    S^^^S    t9^(^K&    3S83S    ~K!i?^®    SS^3^    fj2^<3®8< 

t--ootD        <DC0O^a^ON 


^^-. 

8:?? 


-  OssO  »  O 


•5»S^:3&I 


aS83f. 

(D  (^  <^  CO  o^ 

vO  ONr<  "QsO 


r^  Cy  »-    O   O  On 


3J•!^-l!^ 


<y^O\(j^o\  o\ 


3SS!Si,S<    K35-S3 


I- to  I^ 

8i&K8& 

CD  CO  (>OvOs 

t-r-co  o  fH 

s:?^53K? 

aas^S'S! 

CD  CD  00  CD  r- 
ONCD^tZJ  CD 

r^r-t^  t'-r- 
co  a><o  <D  CD 
cy3ifNtr.rt 

C~<DtO  CO  OCJs 

S&& 

KSs^8g 

g8g8& 

On  On  CO  CD  ON 

UMA-OnO  CO 
ir\sO  OoD  lA 

v3  ir\r-(^  w 

t-sO  r- 

t^O^  C^sO 

vO  [--nO  t--c- 

CD  t-- r-oD  t- 

OD  CD  to  r- t^ 

r-r-r^  r-r- 

'~""""°~ 

8?R3^ 

g^ssss 

KS&S1& 

r!f:S;&& 

SjS;815S 

Slco^rt  o^ 

&S;:9&J38 

SSS^ 

R?^3£S 

o^l/^t-3  ir\ 

o  o  o  o  ^ 

O  O  O  (-1  <H 
to  OnEon  »-< 

On  t—  Ov  »H  On 

rH    O   r-<   r^   ^   rH 

?^?;?^&S    SS;^^^  5S;&&&    l=S;&;;^^    £SS;J:;£    ^^^^ 


O  O  .-»  o 


)OOr<r-l  OQO^O 


CVJ  W  W 

odd 


d  d  d 
o  o  o 


?^^"^   ®»SK®    ?i»^a:"    £&.?,£?,&;    ^&Sj&S 


O  O  O  rH  O 


o  o  o  o  c 


P&Sg^S 


ooooo 

SS33    S^^^S    ^S°^5hS    ^SjSS^    SJSS 


>  o  o 
ON  ON  so  r*  o\ 


OvO  On  On 

d  (-«  d  o 


r-  w  CJ  oD  cjj  t-~ 


O  O  O  O  O  r^ 


>0000  OOOOO  rHOf-tfHO  OOOOO  r^i-*»Hc 


uS-:}sO       f-K^^ «  K^      Cfr  cvj  ir\33      tr\3  •-«  iaih      3kn^cj3     Tncor^K^r-t      cy0JCJr^3Nq 
t-<Dr-      r-eocDooco      t^cocococD       t^oocor^oD       i^f— h-coo       ononOOO 


<D  CO  ON  CD  CO 


r-ONOJK>.H        C>_:ro^ONK^ 


t-  t^  t-CD   O 

(SiP  K-s  rt  3 


O  -^  O  O^OnoD 

2SS3<3d 


S'a^iSg 


CO  o  sO  o^2) 


'j>r-^o      r-oo(Dt— CO      r-r-cocoeo      r^cor^'Oco      Osot^too 


^«3 


Sso  u^u^-o 
OJ  »H  On  On 


S^iStS;^    *3^^ft    i^S^f:^^.    '?^'?'§^    ^5^.'^^^- 


u^sO  ^  '^  L 


^  to  <H  cvj 


sO  ^  ^  "O  sO 


sO  so  r-so 


8R3^! 

t^^  sO  sO  s 


^3^^f^ 


tS3& 


f-  r- 1— r-sO 


•^sO  -^  -O  O        vO-Ot^^ONO^ 

;gsas« 

)  so  r--o  r-  r- 


w  w  »H  o  w 
_|3^0  c^H^ 

sO  ^  ^  ^  sO 


'2»S  ^8cSS(J    ^^333    SSS5 


o  r*  ly  nOso 


eo_4<o  ®  lAi^ 


8S8 


fS  !5^»§s  fii<s»g  s«§g5}  »I3S§  ^i^saa 


I  ^1 


5  £SCo 


sa 


zct 


aasaa 


436 


o  k  «  is 
M  a  -rj  CO  < 


&  I 


\ss 


S  C  i3 


§*< 


E8 


a^s 


Impact 

p       QOOOg  oo  o  ooooo  o       oo  8^^°?^  S-SS-SSS 

-^   -=*   -*   -^  -^.  -*  -*       '       '    ■*  ^   J  ^  -*  -*  ^  »^  f^  J*  -*  -:t   -S   -:t  J  -*   .:*  ^  -^  J 

ooooo  oo    o  ooooo  o   oo  ooooo  oooooo 

ooo  oo    o  ooooo  o   oo  ooooo  oooooo 

o  00808  ss.,8  g&gss  8  ^^  ^^°^^  B^^^oe 

000  00    o  ooooo  d   do  ddooo  oooooo 

SoopQ  00    o  ooooo  o   00  ooooo  00000^ 

oo5co  rt«    r-<  w  pj  r^  cj  o  o   t- u-\  cor-frS'*  ^-3^^SD; 

ooooo  do    o  dddoo  o   00  ooooo  oooooc 

ooooo  ooooo  ooooo  ooooo  ooooo  oooooc 

r— r-cococo  ooooon  o^'-ho<-i  oc^o\r-u\  owcocmcj  j^d--3-jcjr 

dddod  ddddo  ddddd  odooo  ooooo  cooooc 

000  ooooo  ooooo  ooooo  ooooo  cooooc 

»-t.-iw  ^rgcy,-(r-<  i-iOjOjC\J&I  CJOJr-iOir-i  "-fW^r^y^  C:^^G;&5 

o   ooooo  ooooo  poooo  ooooo  ooooo  oooooc 

odo  G  o  G  d  o  dddoo  ooooo  ooooo  oooooc 

ooooo  ooooo  ooooo  ooooo  OOOinO  OOOOQ< 

r-r-r-r-r-  c^coroc^co  c^a-orac^  cot^cou^-a-  ^-^-l^^K^c^  KNto,p^cyoa 

ooodo  oddod  o  g  g  o  S  doooo  ooooo  oooooc 

f-H  ^  i-t  ON  oj  iTv  ic^  r— ^  On  3■^-o^cvIC^  r-ojOMr\ON  oj'-jtoocj  —(.-(^o-hcoc 

r-r-r— vor-  t^t^r— r-t—  r^r--r-cor-  cocot—coco  tococoosco  cot— r-cococ 

MD  00  \£)  r-vo  irvvou-MTNt—  voir\kr,ir\^  j'K\-4k>^  '^'^I0u?'^*'^c^'^'^m( 

CO  t-^  CO  r^  CO  cocdcQcot—  cdcdcocdco  coocorAcrs  co  c>  on  ctn  o^  cot— COOnCTnC 

(Mc^OJK^c^J  cjcvjowt—  r-ioooo  ir\<7^oo-j  r-coo^ocv  c^cyojr>.t-ij 

ojrH^crsfTv  irM-~\c>j'as  x£)coojo.-i  r-n^--  k\co  r-^-*H~vOJ  K^ir\t^-HCOii 

\oi— '0»r«^  ^o'^'^vDr—  NO^r^cot—  cot— t— r— co  t— t— cocot—  t— vii^Dt— t— a 

Cy   (\,  I— vo  pJ  Oir\OvOvO  \0j-000  vOCy^CJt—  '.O^O^CT\  COCO'H<OOu 

K\cyojcjf«-\  omhcotoj-  vorHCcoo  u-viTMTiO-s  jc\jcocycvj  ir\(?\c\ir-r— < 

Sfigss  ss^s8  ^^S'^^  °^°^^  ^s.a^?^  &s^sss 

'OO-osD^o  vot— r-r— I—  ^ot— i— t— t-  t— ^covovo  »«  t- t— t— t—  cor-cc^oo^t 

^r^K^J^f^^^-^  OOOJi-HtA  cy.-<^C\J^  K\C\CyK>K-.  CNjO^^Q  C»r-C0O^COf 

i-Ol— Ot— CO  O^C\JK^^OO^  j-r— U~\<-<r—  OC\jK\0«^  rHO.jr— O  OOvi)C\Jt— c 

U^iAuAuAiTt  vOt-vOvOiA  M3^o\D\OvO  vOOvOO'O  -^vovo^or^  t^co  r-^  r-  t^v, 

CNO^J-J  ^COcO-*-*  ^COuOt-CO  CyOjoaOJCO  CoCjj^^OJ  COcOOO-OJC 

^   CJ   CVJ   Cy   K-\  iT.  lAsO  UA_:T  _*    L-.  r-tO   t—  CTnTO  UA  C>0  t-O   tT-M^  t—  CO  --O  -:t  -:T  CC  c 

Oodoo  ooooo  G  G  G  O  O  odoOO  OOOOO  ooooo< 

ddddd  ddddd  ddddd  ddddd  ddddo  oooooo 

(T,  O  C- 0^  as  OvO-.COOC^.  CT'C0cOt--CQ  t-COCNtrCO  '-ccoc^c>co  toc^o^o^r— t- 

ddodd  dodod  ddd'dd  doddd  ooooo  oooooo 

^j'-SJ^J-  OsjOnOO--  ^  ^   tf\^  (T\  ^OscO-:JCTs  j-CTnCOO-*  J'-J^COC 

^^CmCvj^^  C^j  ^  ^  ^    rr\  j-uSvjDKNJ  jJ'J-(0-:t  _3--J^OKN-rf  K>J-U-\kr\vj 

oddod  ddddo  ddddd  ddddd  doooo  ooooc 

asC^O^O^C^  CT\C*vCr\C7vON  C\cOCOOnOn  OnCTCOCNOn  ONO-COt^CTN  OvO^COCOc 

ooooo  ooooo  ddodo  doooo  ooooo  oooooo 

^^OJCJr^  CyJ'-JJ-r^  J^'^ifJJ  tO-J  »^  K-xJ^  r^J^  \0  CJ  J^  CJ  P^ -J  -:?  vO  -^ 

dddoo   ddodo  ddddd  dddod  ooooo  oooooo 

0^000         OsO-^OcO  0^0  ODO  CJJCOOs^  K^cO  -H>>OC0  \QOOO^ 

r-lC>JO"'t-fT\        Or-OCAJ  O'HOJf^Cy  aD-*r^f^K\  l^^Q^K^K^-d■  coOco--^ 

r— r— vo^aj'-o      t— \d  t— ^  t—  r— r— t— [— r—  i— t—t— t— co  t— r-coco  t—  r-t-^r— t— co 

vocoT— coco       t-'33r-r— co  t— t— t— mr-  r-vO'^^.'-o  r-irNu-sir-o  co  r-co  r-'-o - 

»Hir\COvOt—       OnvDOvcO-*  COOOniTiOn  COOJ^f^iOv  cOCOsOCOCVJ  MJO  t— CO  <-<  r 

cor— i^r-t—      [— r-r— r-t—  r-cot— t— r—  r— coco  coco  r-cocococo  t— t— t— r— co  c 

t--COpr\0JaD  .H.-tC\J^n?  OJr-(t— VOiH  OJOJOiCOCO  fr\cO  JUDOJ  ^-:tCO^vOC 

.-tOOOCTN  vOr-f^pr^O         OJVOOJJ-ITN  —iOO^CTn  a\COt— <-iO  CJtfNMDOr--; 

^cyr-.,-«r-t      ^^orH^      ,-tOrHOO  rHcycoKNCvj  cy!C»»owcy  udc^voctvOf 

•o  iTN  t— ^o  u~\  \o  r— CO  ^vo      irso^o»Hco  ^OK^^Ht— k\  t-io\co^icj  von~\.-<cyon 

vo  ^  O  sO  ^        ^^^OvO^OvO  vo  I— vo  r-\0  vOvOvOiTwO  VOUMTvvOvO  t— t— COf— t— vj 

inirMTMi^iT*     vovou^vOiA      if\\ouAiAso       lA  »r\  tn  in  lA  irv  */ itmt.  Lr\  \ot— t— »ovov- 

c0K^^- voiTv     Or— ojt— ^-  cot— •-('-tco      ocoo>vo-*  vooot— ia  i-<o^^iao 

ir»w»f\tr\u^      'OnO'o>ooj      ^o^'3cy^-      cyH-t— t— w  t— t— cy«yr—  vovovot— t— 1— 


a  «-> 

^5 


'  5  *^  fe  « 


^°fcS£ 


o  tJ    O    S    »4 


5  <  ^  5  ( 


Impact 


437 


<»  -^  T  ■a  ^ 

Icl       a 


a     I 


t      a 


lO      ooooo      ooogo      oinooo      se^SS      8SioS8 


6      do      ddddo      doooo      ooooo      ooooo 

rr^         «%0         ooooo         ooooo         OiAOOO         Oi^tfNQO 

.8.^1  |SS8«  8e&«&    &««S&  «§g«& 


cu   *rvO   o  o  < 
o   do   d  d  < 


t  d  d  o  d      ddooo 


J  d  d  d 


ooooo 


)00   ooooo   ooooo   Qooo 


o      ooooo      o  < 


>  o  o  o      o  o  o 
>  r\0  o 


iTKirso  G  o      ooitnoo      orsooo      oooo*^      S;"^tiV^i      i<.f:-m?-u^      ^ao  f-co  ^o       t-^o 

8SI&«  «a€S£  S&S«&  S«SS«  «o&o«  °9°°°  ss&s«    &« 


ooooo   ooooo   ooooo   o< 


>d   ddddd   ddooc 


isa&s 


;g?^S?    SSSSS-    ?.?.«2S    S3fi?S    ^gS8tR    SS^^S     S<S!R^S    S^ 


3 


la] 


2    ^^S^^S^ 

d  d  d  -^  cJ 

d  d  cC  r^^ 

::;SS22 

Ci  0\0  ^  --< 

u-\0  J-  o  o 

80     10. 
66     11. 
72     11. 
90     12. 
.52     11. 

.52     12. 
.U8     12. 
.Ul      11 
.62     11. 
.86     11 

r--* 

r-     cotococo  c^ 

_^        r-  t~-  ^  O  W 

to  oco  <^•^ 
r-  r-w  t~tt\ 

COOO  ^  o  c\* 

2Sie«lR 

,H  On^  O  O 

0  ^  0)  0  CVJ 

Sf!S«S 

S^lR 

t-      r-t-a>cot- 

S^S^« 

w  r-co  t-r- 

f:*-?-S« 

CO  CO  CO  COO) 

^5  SJif!. 

COOD  (?*COCO 

53 

r-      ascDooajOS 

r-co  t- t-co 
^'?-'22  o 

ss^ss 

t-CO!OCOO. 

ll°3^^S 

m  0  0  0^0^ 

««a£a 

-*   Oi 

^o       r-  I-  r-r-  r- 

t-t-r-t-f- 

M3r-.ot-r- 

-ot-l-r-l- 

^^r-r-co 

r-coojot- 

comto  t-(0 

r-m 

8    ?;8;?,£^ 

CO  iAOn^  i^ 

S'S^R^^ 

^££SS 

S,S»:«^ 

SSSSPf 

^So€?l 

^S 

d  ^  d  -■ 


t-co-*tr.^      t— cvii-t^^      K\^ 
OMfNco  r- o      oco»«%(7\C7v     J*  J 


_*  OJ  On  J  W         01  C 
OnCOO  On  t^        OnC 


S    3PSS8;    SKSPSa    ??.£a&?_^^l?,SR    SS|.S5R    ^s^^ss    ?*^*s    SIS^ 

d  ddddd         6oo6.i         o6^•-lr^         O'^.^'^d  ^r^-JrHO  OrH-<rfi-<         ^  rH  -H  rt  rf  .-<  ^ 


S  "^"^SSS  S^P^fT  ^.^EJS^  ^«»3R  «^aS5:  'i&i^s;«&  ^~P*^  :?^ 

d  ddddd  dddd^  d  d  ^  ^  cj  d  01  ^  ^  o  ^^^^o  o^^^a  ^  «  .h  ^  ^^  -•  ^ 

o  a5«5^«*g;  SS^o^SI^  ^.^S^'t^-^  *i2.^I^^o^  ww^"i^5^  ®w^P^  P^^^'^  &^')r. 

d  ddddd  dodo^  odoo^  oo^'-to  r-j-Hr^-HO  o^r-(^r-<  ^^-t^^  r-< 


?3  AS»^^  ^"^^s  -.•^*«  ^«~^§  ^fT~^^  ss^a^  a?^ 


3  CO  (O  CO  On       CO  < 


CO  On  0>00  On 


«    arlRSlSI    aaSS^g    SSgaR    8»R«*    ^£S<«S*,    ^*8^3    88SS^    3 


cA 

<^o;ai<^<A 

<^,0^0^c>.d 

rH                      r^ 

d  <>.d  <>.aj 

d  h^a 

K<0  <> 

a5a;cA<^a; 

0  0  On  On  On 

<^Ov 

s 

^£S12« 

aG3«S< 

assaa 

aiiSi?^ 

3  J  1 

ii,f;« 

^RS«,S:SS. 

f.SP-S-i 

as.^ 

r-co  r— r-o 

^""'^^ 

CO  ON  0.00  P- 

■^"^ 

'-'"'^ 

CO  0  OnCO  o- 

<- <>•  o^  r- 0^ 

^ 

g«^S& 

«&iS^;ss 

s^»g:s8 

F18^ 

5P5- 

S!J«S£S 

RSR25 

«» 

^(;^3^<i^^O 

OnO^'O  t^ 

^or-o-ot- 

-0  r-v, 

0-0  r- 

^  r-<»  p-:- 

>o-or-r--o 

s 

?^^3l&? 

g;2Sg;S 

aSRS^g 

S&SR2 

s;^° 

»«*«« 

S?:2S8 

«« 

t-t-l-t-O 

•0  r-r-so  ^ 

.0 .0  0  0  1- 

NO  NO  NO  NO  r- 

NO     1^ 

-r-t- 

vodjco  c-r- 

t--oa>>o  I- 

r-r- 

0 

S^SSg- 

3sa?is 

;SS8RS< 

easRS 

?,ss8a 

8S33S 

;S3?.sa 

S<° 

>nO'Ono      ir\r-NOir\NO     nov 


d  ri   .H   W   01   «  «   W   KM 


3SR3P    S£S8«    35-: 


ooooo       ^^ 


(QNodtfNd      d»-«c«^ir»      «irNr-o*o      d••^*^'^^^-      r-<o  t>  o  "H      ?*c*2;25(      ^Xi^a 

S<S»^5sj»       jT^-*^-*        r\^<r»^NO       C»NO^<ONO       No3NOt-P-       t~h-t~to<o       rocotoa 


JSRS   «25:; 


iS    2S«25   «S 


a 
3  _. 

Is 
•a 

U 


«4       a  e  q 

C        CO  -.  ». 

t.  2  £  -  ^ 

^  0  •  s  »> 

5CSCo 

'Jill 

•  «  «  B  k 


438 


Impact 


If 

S  ■* 

o  o 


111. 


a  i-<  "      H 


g)  as 

ill : 

3mI 


as 


o  o  o  o 

O  Q  Q  O 


9099  9  ■  90000  00990  00099  9SOOO 

5,SxM  *tRIR«R  R&KXR  ^^»«  «SR33 

•••••     •••••     •••••    __•     •_•    00000 


0000    00000 


00000 
p  Q  UNO 


00000 


00000 

»§sl  l§e§l  mil  l»§ll  §&§8§ 


000 

oc5o 


0000   00000   00000   00000   00000 

0000         OQOUNO        OOlAOO 


II I 

o     000 

>\r\QO     ooooQ      otrvuxQO      QOomo     000 

JSSs   ^3:^^   iR34&K   S^RrRRR   SJfeS 

>ooo      00000      00000      00000      000 

Sllll  S||3|  |§I|S  sS^IS  a|Sp  tS^ 


0000   00000   00000 


00000   00000   00000   00000   00000   00000   000 


o      o  o  o  o  ir»      irviAO  uMr\      oou 


OiAOQO       QQQQO 


o   00000   00000   00000   00000   ooooo 

O        O  O  O  O  lA        UMOOirtLO        OOmOQ        lOU^OOQ        QinoOQ        OQOOO        00( 

3  ssi^sa  33^s^  ^3^3^  33S^I   ^^334  S333S  S%i 


ooooo   OOOOO   ooooo 


>o      ooooo      000 


>  o  o  o  o 


a^^r4  KNIT* 
f-i  O  O  O  rH 


^iS;»a?|  ^.~.^S4  s^s^  i^fig 


«3S8SS 


^    rH    On  O    *■ 


^S'o^    i55lfsF 


J;:SJ    SS32JJ 


lA-O-^JsO  UN 


:8:3P:ll£'   «i 


iHi 


3  ™5i 


o^ o^o  c^ o 


8R3RS 


OsOvO  O  CJ 


•-«  PcNM^_:} 


OOOOO        ^r^^ 


£x   §©^^3   2),;?>«3€  ^^«as  S^afSs^   &«;^SSi   S^SSPl  t^J 


CO  a\(j\CD  a 


i-a-atf^si  ^i^stoji 


^5tP    R3P8iS 


SK2&3 


CO  o^cD  c^co 


o  c^o  o  o 


«»8 

O  CJ  o 


3  O  O  O  C 


Sr^  COsQ  UN 
lAt---3  On 
OOOOO 


®s,^4fi 


o  o  d  w  »-t 


no>o  r-<D  < 

r^  KN€D  r-< 
fH  r^  0  o  * 


$3S 

•H  OJ  OJ 

Onknun 


d  d  o  d  d 


ooooo 

CO  K\tD  ONCr 
r-ir.r--:Jo 


O  O  O  OJ  rH 


o  r^NO  00      kno 


^s^g^s 


.-t   i-l   O   O   r-l 

w3eo  t-W 


OOOOfH  tHOfHC 


000»-t»-t  r-t>HOOi 


<  Cy  CJ  W  rH 


g;8^8i 


:3f§:83^    S€;Sc^^    ^S;^S<?    ^^^^^    ^^c8g&    S^5iiS:3J^ 


S^^^5 


>  O  O  O 


t>-        •<>  t-t-CD  I— 


OOOOO 
a>  00  (D  Ql  OD 


0000^ 


o  <-t  ^  ^  r^ 

&32S8i 


J81    ^S:S8^» 


000^0 


•-4   O   O  f-l  •-« 


4  0'>-(oo      ooooo      oooo< 


d  drirH^ 


OJ  On«) 


^??^.^. 


■S"PaN-j3N 


3  O  knOJ 


O  On  O  On  On 


0\  On  O  On  »-* 

p:S8S^S 


ooooo 
n  o  vo  CO  00 


S<S,S,;33 


Pi?3 


a!  fr\KM--ON 


f»-KN.!?^(0 


€€fi&Sj 


On  O^  O  On  O 


000  OnO 


_4nOn. 


^  :^s^^:^  Si 


^KNsO_3^K\ 


CO  CO  r-(D 

-JnOnO  UN 


^J^a^P    ^S:?152    ^^8^ 


O'l^        .Or?" 


I— t--NO  t-Q 

nO  r-Of  u 

K\On<D  o  u 


)  OnQ 


^£R8a3 


i--r»-ONO 


^■Nb  ONt-r- 


?8?3&^ 


On  r-^0  On.<D 


P»>Kg^  S^IOSS^  SJSSfifl  Ji^RSJ^  «»©S3  ^J^^^a  to^s 

O  >H  i-H  iH  r^  CJCJfArArA  N^»A»A«NfA  KNrAtAfArA  J-Zt-J-^-lt  -alTvirnTvUN  iAuNnO 

OKMIN       W  ^CDKM/NO  OnCMUNOO  Cy-a"UNh-W  ~:}<D  tC\0  U\  OO  U\H «  O  h-Ov 

<^»a»ij  jji^sii  iiiii  siiia  s^kt^e^r  s^^'st;  fiisf: 


K\     ^  ir\NO  r-  o 


tStSS  »^S3&  8<gg^3  si^ii  gisss  ssf 


J"! 

^-     -"Eg 


a  c  «  o 

B  ^  -P    8  rH 

5  £  0  C  o 

«  •  rH 

L.    9  i.          • 


Impact 


439 


Bf 


b5 


5gSl 


a     f 


'l"^| 


I  ^  o  a 


ir\o  irv 
d  d  6 


o  o  o  o  o 

O  G  d  G 


if\     rNg^iOOO       JC'^S"^^       ooiTvOir*      lAtriOOifs      irtiTNOu 

3S     \£  s2  so  ^  NO      \o  ^  vJs  35  vJS      so  \o  ^  ^  NO       r- r^  r^  r~- 1^      r- r- t*- t 

GO      dooop      ddddd      ddd< 


ddddd 


o  o  r\tfN 
r-  t-  t-  t- 
d  d  d  d 


ooooo      ooooo      o< 


ooooo       000( 


SI§H 

ITNO  lAO  O 

RfJ^S-e 

o  o  u^o  o 
^f^^  oj  0-* 

r-  r-  r-  r-  r- 

t^r-  t^  r- 

o  o  o 

ooooo 

OOOOO 

ooooo 

ooooo 

ooooo 

ooooo 

o  o  o  o 

^O  vO  ir\ 

^esss 

OOOOO 

O  O  Q  Q  O 

evj  r-o  o  o 

\0  ifN*C«\D 

O  u^iAO  o 

iTvON  O  iH  lf\ 

^K^H 

o  o  o  o 

O  O  O 

ooooo 

OOOOO 

ooooo 

ooooo 

ooooo 

ooooo 

o  o  o  o 

lg§ 

(f\0  o  o  o 

O    r-l   rH   rH   .H 

ooooo 

o  o  itno  o 

§S8§S 

gs§§s 

§S&8i 

U-NO  o  o  o 

O  O  O  p 

o  o  o 

OOOOO 

ooooo 

ooooo 

ooooo 

ooooo 

ooooo 

o  o  o  o 

5  iaJn 

Ssls^ 

o  o  ^o  o 

f-gj  fH  o^  o 

IrSSk 

^^Sl§ 

Kf;^P;S 

o  ir\0  o  o 

l,RRR 

o  o  o 

ooooo 

ooooo 

ooooo 

ooooo 

ooooo 

o  o  o  o 

■^h-"?*     vo  CO  CO  CO  CO     a>  Q'^  f-*  S\<S      ooso<^a) 


^a^c6  o\r- 


j  CO  iTN  ey      cj  p-«  cy  < 


^.».» 

Jt  ^  ^  -a  ^ 

tf\^  iri.*-3- 

JJ^.»J 

rsi/NlTNUNU^ 

«^u^lI^K^u^ 

K^it^iAiA 

SSi,^ 

CJ  CVJ  W  OJ  OJ 
0\-:»   iri-3-  .* 

a«s^i^s 

ey  cy  ^  cy  cy 

\0   rH  J^   rH 

S  £1  o  2!  J 

S!S<asi?, 

O  r^  .-)  O  .H 

RSSS 

-»'^"' 

J,A.fN^I/N 

'""^'^'^'^ 

'^'^"^'^'^ 

i^tnifMfN^ 

^•^^^-^ 

vO^O^O-OiA 

vO>OVO>0 

A3#> 

3^€;«« 

^a^s-i?- 

■?s'^'Io'?v5 

oj  1?.  r-  r-  ^ 

r~  CT«^5  r- 

iSSiS'P 

*£i&B 

j^  J 

.».»  J.».» 

^^^  ^j 

^^-»,*  J- 

J-  J-  -a  -3-  J' 

.»  J  J  J  J 

J- J  J  J  i^ 

J  i/MniA 

S'AS' 

55-333 

i?^^^-?. 

^^^^^ 

7n35  o^  ^  r— 

2^S?>« 

&€S;?>R 

s^^s- 

^^^ 

.=t.»J  J^ 

^^^-^^ 

-a-  J- J-   ifN-* 

^;.=t  J  J  J 

J  J  J  jj 

J  J  JJ 

^SI3 

ASG»K 

*ss?:2» 

:^^^«5 

s;'g:^s<?i 

3^88ti?> 

#.K۩^ 

3i?s^3 

•»'^^ 

jt  l^^1^\u^lf^ 

-'■="^'^'^ 

^^^^^ 

^^^^^ 

J^^^  J 

.»  jj^j 

^^-»-* 

^;Rf^ 

^PPSP 

^  I^OOJCO 

CO  »rv  cH  o  so 

CO  t— CO  On3 

*^*33 

S  r~  rH  3  .* 

Ov  <7vav'?v 

J  l<^.a 

J-   K\tf\tf\tf\ 

K\J   KSKMO, 

iOj*  ^  J^  _* 

KN-*-*^  trs 

>Aj  K^K^J 

I^IAJ   KNJ- 

KMCMTi^ 

o  o  o 

o  ino  o  o 

rM  .H  CJ   OJ  OJ 

O  ITNO   IfMA 

O  O  tf\0  O 

cy  CJ  cy  cy  CJ 

8SS82 

o  |5iq>o  o 

88SS 

o  o  o 

ooooo 

OOOOO 

OOOOO 

ooooo 

OOOOO 

o  o  o  o 

SS2 

O  IQO  o  o 

O  O  O  UJUJ 

SS^^a 

o  o  u^O  o 

sssss 

SGSSS 

o  o  o  o 

w  w  cy  cvj 

o  o  o 

ooooo 

OOOOO 

OOOOO 

ooooo 

ooooo 

ooooo 

o  o  o  o 

o  o  o 

rH   rH   •-< 

rH  rH  W  cy  Oi 

8?,S»1& 

cy  cy  cy  cy  cy 

8g»a8 

O  O  O  O  (A 

W  W  CJ  OJ  rt 

2SS8g 

o  o  o  p 

cy  cy  cy  cy 

o  o  o 

ooooo 

ooooo 

ooooo 

ooooo 

OOOOO 

ooooo 

o  o  o  o 

o  o  o 

M  <-t  w  oj  cy 

O  (TNO  UMTN 
CM  K^-:*  OJ  cy 

8SS?,S^ 

SgSJgS 

O  O  O  O  u-\ 

rH  •-»  tH  C\J   CVJ 

88SS 

o  o  o 

ooooo 

OOOOO 

ooooo 

ooooo 

OOOOO 

ooooo 

o  o  o  o 

^  <-t  ^ 

sssss 

O  O  O  U^iA 

cy  if\-^  CJ  cy 

S8S?,8 

O  O  (f\0  o 

8  8SgS 

S:5SSS 

88S8 

o  o  o 

ooooo 

OOOOO 

ooooo 

ooooo 

OOOOO 

ooooo 

o  o  o  o 

o  o  o 

r-(  rH  iH 

•H  rH  W  cy  W 

O  O  O  ITMA 

cy-*  -*  cy  cy 

SSS^R^ 

O  O  lAO  O 

SSSSIS 

o  \r\u\o  o 

o  o  o  o 

o  o  o 

OOOOO 

OOOOO 

ooooo 

ooooo 

OOOOO 

ooooo 

o  o  o  o 

N  KNCO        CO  ir\CO  t«^  f- 


».3J 

J  -*-*.*  .* 

J  -*  -*  .^  -* 

^  jj.»^ 

.*  jj  j^ 

"^^'^'^'^ 

tfMr^.A^tf^ 

u^,A.rM/^ 

?iSi3 

cy  r-cy  cy  cy 
CO  cy  K^cy  cy 

CJ  -*  cy  \0  t— 

J-  CSr^  cy  CN 

S8;^8^?i 

SS!.g8^ 

if\fr\^K^r- 

O   O   HjrH 

K^OCO(D 

J  ll^  J 

J  ,/^^^u^ 

.»^  UMAif\ 

U^J-  iTmTN.^ 

u%j- J.3  <r\ 

^O  J^O^O^O 

M3.0  m^O  ITS 

^oso  a^^ 

a«« 

^S«€« 

?,#-#vSS 

H\i\'r^i\'S 

€1?,S?-^ 

ir\«riK\-*  lA 

^Siss; 

^  JJ 

"'"'"'■='"' 

^^■'-'^ 

■'--■'-' 

JJJ.=»KN 

J  -*-*.*  .* 

jj^j^ 

J  J  J  J 

s^«?; 

^S««« 

^32«gr 

a3^^S~ 

^2PRS 

g;A25§ 

^co'^'^  ^ 

g«5gr 

a-»  J 

.»  J  J  J  J 

rrs  j^  J-  K\_* 

'^'^'^•^-^ 

J  J  J  J 

SS;?^ 

,*  o  «■*  »'\  ^<^ 

^^SSS 

Ri?>»'?-3 

^^^-*  OS 

J-  <x>  c^  K\^ 

cy   ^CO   K\r-( 

3i?vA^ 

J-  lf^  j^ 

jt  ^  ^  ^  ^ 

iAj.»  |/^«^ 

-*-*-*.*  ^ 

j.»  J  J 

5:§« 

asiRS-R 

^St,KSS 

SA^^cS 

f:i?.^f^8; 

?s§;Ra 

^^<A 

"wOOs      sAiTSMjtoo       (yey<0«Hf—       ir\pr\C\K\K\ 
r  rf -»      ^f^^-o^'^l«^     ^i— d^oco      0\  cj  ^  <-»  cy 

iH.-4rH         r^rHCWCJCy  Cy  K\K\Jt  -* 


\co\ocooo       cy»^*fsr7 


>  iH  9v        KSOJ  O  I 


^32 


ss 

•5 

|5 

•fe 

£, 

'-S 

pi 

.   ^^g 

a    i"i 

;  "»^ 

9    7^*3  ° 

»■  .  ,.£§ 

a5«sg 

l3"hS£ 

s;?!? 

.2.Sl> 

St;  i-a:: 

Ecels 

ti^tig.. 

iz^is 

440 


Impact 


tt 


^  i 

l?3 


ir  I 

g  §loa 


a^s 


'ate 


t- 

S' 


S'Ssvoon*.  cococolRos  co(>rHONO^      oji^nr,^  vowN^ojw  w^tf\>ovo  r-ovoog  \oSo\b 

>vo^vo^  ^\o\o^^  vovoi^vor-      t^t-t^t^  r- 1- h- 1- 1^  r- r- r- 1^  t^  r-t^cocoo)  r^t-r- 

)dood  <D  <i  <i  S  o  d  c>  o  o  o      o  g  o  o  d  o  g  <>  o  o  d  d  d  o  o  d  d  d  d  ddo 

Oif.  OOOO  OiTvO         (fsOiTiO  O  OO         O  OO         OO  •0<C^C> 

r-IO  r-t^rHOJ  rH.-lr^           O           .HO'-'  •-'  ■-<.-(           r-t  ^f-l           r-i   t-t  OQO 

'OOOO  OOOOO  OOOOO   OOOO  ooooo  ooooo  ooooo  ooo 


OO    OOOO   ooo   o   ooo 

5  CO  CO       CO  t-  t--co  t-       t-oo  o  0\  O       •-(  CU  OJ  ^ 
Jdd      ddddd      d  d  d  d  d      d  d  d  d 


I  o      ooo 


>  o  o       o  o  < 


MAO  £\rv      if\Q  tf^ 

3COQ&»0\       »f\(©  ir\ 

5  d  d  d  d      d  < 


J  '?\      vfl  5  ir\  tpv5 


JS2S&  2SS2S  S&&8S  !S'&I&&£'  SB&SS 

joooo  OOOOO  ooooo  ooooo  ooooo 

>  d  d  d  d  ooooo  ooooo  ooooo  o 

>  vS  ^O  3  ITS  ^5\3tf\^3  iJSvO^SiTv  \D^o7\"uN\^  uV 


ooo  jPnTMA 

OOO  ooo 

ooo    oddd  d  d  d 

ir\\r\tr\      ooooo  tfMr\ir\ 

CNrHON  a\0(?vf^-5  iTvCO   o 


too      ooooo      ooooo 


S    ■i^'^g&St    g^&S^^     5^8^^S^     K^^^^^l 


JXO  <M         CdvO  ( 


3  CC  l^^^o  Q>       i?Sn< 


^J«^«^^ 

'^'^■^'^'^ 

u^j^jin 

«^^^,n,^ 

'^"^"^'^'f^ 

'^'^'^'^'^ 

,A^«> 

saaasi 

?!,s<af<s 

cy  w  cy  cy  CJ 

.H   .H    r^   r-l   .H 

535SS 

^  iH  iH  rH  f-H 
t-0\0s0  O 

O   (H   tH   rH   O 

gSot 

'^'^'^'^'^ 

'"'^'^'^'^ 

ifN^^^iAin 

uMrMrNu>NO 

'^'^'^'^'^ 

"^•^"^^^ 

NONONOUJ-O 

>OND,A 

RRSStP 

fr\tr>  OJ  »0  K\ 
r-cO  OS  t^co 

^HMfMng; 

ss^si&g; 

S8i£8^8 

r-o  Os oco 

aas;^:;^ 

2!8^ 

^  ^  -*  -*  -* 

J- j-^  J- J- 

J  J  J  J  J 

J  J  J- J  J 

■^j^  J-  '^ 

J   ITNJ  U^J• 

J   ITN^   ITNITN 

UMfMA 

-*   K>COCO  K\ 

IRSSSJ? 

CO -J  CO  K\CO 

S'RRRS^ 

^  r^-:f  »r\vo 

5^?S^ 

#.^#,s;s 

«P^ 

J  J^  J  J 

^^^^j* 

J-  -^  J-  J-  J- 

J- J  J- J  J- 

^  J- J- J^ 

J^  J  J  J  J^ 

j^  ir\ 

03  Ov  Ov  CT\  ON 

cjj  cy  oj  cy  oj 

g^ssasi 

cy  c\i  cy  cvj  cy 

OS  ^  On  On  ON 

88(8^SSl 

SSSSJ  81 

21S3 

-»^^^J 

jj^jj 

JJU^ITNJ 

-*  ^  -*  -*  -* 

J  JJJJ 

•^"' "'"'•=' 

^^ja%j 

'"'^'^ 

«*«?:5; 

^S'S^S^* 

JjaR*? 

gRKK* 

s^s^^s- 

*S*R3 

CO  it^CO  CO  o 

s-sa 

J  .^j  J  J 

J  J^^    K> 

•='-^^'^^ 

^^-'-="^ 

•'•*'^'^^ 

KN^   PTNJ   KN 

KN  J-  1^  J-  -* 

^  JIfN 

oooSS 

SliJS&g 

S&2&& 

&&g§S 

s:!^S'2S 

ooooo 

s2Gs;s 

SSl^ 

ooo 

ooooo 

ooooo 

ooooo 

ooooo 

ooooo 

OOOOO 

ooo 

00&22 

2S22& 

22SSS 

ir.  £-  u-'  o  o 
o  o  o  ^  w 

2g822 

82222 

228^S 

sss, 

.S22    22&00     lS'o2&S    SBSeeS     &222S' 

,2^5S      oir\ooi/>      oootfMTv      ir\if\ir\(50 

)OrH^  '-•'-t'H.-HO  .-(.-H.HOO  OOOOrH 


>  o  o  o      o 


82 


OO       ooooo      ooooo 
OO      oiTNOOo      trsoooo 


>o      ooooo      oooo< 

',■&    222&&    S&S&: 


looo   ooooo   ooooo 
)ooo   ooooo   ooooo 


>oo   ooooo   oooe 

;2s  2228S'  eei&j 


loooo      ooooo      oo< 
)oooo      ooooo      ooc 


ooo 
o  o  tr\ 
odd 


\Sso^.H       oSScoo       wcyw'?4ir\       u^WiHcy'?*       Oiorr\^»rv      ^  j*  irs^  ir\ 


5    SSiSag    a£!28!P;    g^SISCEJ    iSKRSf 


\tr\mir\ir\       CO  KMOi®  c 


^S'fi.^i 


t ?,?,*,?;    ^3?.5S    3RS:SA    '?>'S.S;S«    ««#.??."    "S^^~ 

>tr\  («~\  KNCO        ir\K\cuc-cO       (nmcpcpfTt       »r\KMrMr»K\       •C\t'^'OK^•0       »r\pr\»riir\KN 

)cocococO      cot— cfNOOT      ra  r-vo  ^co      <di— cot^co      oooocor— co      'Ot—  r-co  t~- 


pgcy 


NfflOOJg  ir\K\JlAj<^         JK\^^^        ^Jj^pg 


^ScO        COCKCTvOnOn        C^5( 


151    S3 


28; 


5    a 


o  o  S   d  ts 


Impact 


441 


8 

a 


8S12^ 


£  I 


5^  a 

S  '^  s 


Sto  a 


o      o  o  o  o  o 


m 


o  o  o  o  o 


r— r-t— r-r—  r-t— ScyM23  cococooo 

ddood  ddddd  oooo 

ooomo  «r\ooo«rN  ooif\o 

ooooo  ooooo  oooo 

G  o  d  S  o  dddoo  oooo 


ScO        COCO  O^X>  C 

>  d      d  d'dd  ( 


coSo 
d  d  < 


&«§«§  g««§§  «§§S§  s§|| 


ooooo      ooooo 


;fi3 


jeesR  g? 


ooooo 


i«S« 


>oooo      oo< 


>  o      ooooo 

)  r-     CO  "^^  !«-%.-. 


D   ooooo 

OOOOO 

ooooo 

ooooo 

ooooo 

OOOOO 

OOOOO 

6  d  <>  a 

w  oj  oj  cy  oj 

D          ooooo 

sslla 

O  lAO  »f\0 

ooooo 

lls^^^ 

§§§sl 

sl?§ 

ooooo 

ooooo 

ooooo 

ooooo 

OOOOO 

OOOOO 

ooooo 

oooo 

-.  ff\K\^   c-O 

\£)  ^O  vD  ^£)  ^X> 

gllgg 

ss^ss 

O  if\0  r^  Qv 

gf«P8 

o  ^  ^  tr\ 
o  <H  t^\b 

D   OOOOO 

ooooo 

ooooo 

ooooo 

ooooo 

ooooo 

ooooo 

oooo 

o  i-t  o  rt  K\      oRjK\)ri 
or-r— oir\      cy\Oj3to*-- 


i^ 


CO^  O  rH        Ov 


AS« 


CO  o      o  Ov  r-Q 


-  O  O  O  J-        OMi 


p-- o  ir\co  vo      j'OOirsiHO 


OJOOCjvO        jhC0-*OO\ 

c\j  o  o  ^  ^o      ^covpcyiH 

O  .H  cv  O  W        ir\cyONr«-\^ 


ooooo 

o  o  o  mo 


d  <i  S  G  G      ooooo 
ooooo     ,952.1^9. 


ooooo   o  o  < 


o   o  o  o  o  < 


o  O  O  J-vO 


OOOOO   o  < 
OOOOO   o  < 


ooooo   O  o  < 
ooooo   o  o  < 


O  iH    oooo 


ooooo    OOOOO 


OOOO 

d  d  d  d 


J  o  o  o  o  o  u-\o 


\oo   ooooo   ooooo   "^SjOiO'O  oir^ooo   oooo 


)000   ooooo   ooooo 


ooooo   ooooo 
ooooo   ooooo 


o  o 
oooo 


3C0  t^co  fXi  r-vj 


ooooo 
ooooo 


o  o  o  oo   ooooo   ooooo 
ooooo  ooooo  .9  999S 


ooooo   ooooo   ooooo 
ooooo   ooooo   ooooo 


ooooo 


lOOOO  OOr-tOrH  i-*000 


-3    S&5 


!Rr£^?    SIS«2J 


«&S!?;8    SS.'SRS: 


r™     00  o^  c\co  \ 


OviTMrNj-  O        vOChOOt^ 

cocoo\c^(K      t-cocotor- 


SiSRSS    «S;S!S^    ^*S25:    gp^^Pi    ?SS«'i^    S^S^8i«    ^S*8R    22S;« 


^•<^CJJ        u~\voOltr\(f\       Oirsf— i-HifN      co<-<OsK\j'        "^QiO^Q       ■st^^^^Tt        K\K\ifNtr\i^       ^-^^-9 
)  ^  irv3      coa\o.HOj       r-<^ocycj      ^^^1X3       t-^cocoo      o  ^  ^  j 'S       r-coJVoo       -^cvjcj^ 


^^o O        O^O ^O  " 


ooojooo      oo* 


NlTSvO       «00^0^0^ 


scss?  fipi^F:?;  ssafi*  «a 


)(^^iri^         Or^CT»i»^^         <VJ--C0^5^       NAO\Ot~ 
lOJfyCVJOJ  trNtrsOJCVJ<-4         WCyOCTO         »i^^&\ 


^      o«w2''^     ^St? 


iss«5   ^is^se 


•4  S  k. 


°  fcls>5 
E  8a>5v 
S      «"?:?° 

.5SS8.2 


iSS, 


442 


Impact 


^3S  , 


«   9    « 

M  ^  M       q 


II 


It 


t         0 


CO  0\  C\  c 

d  o  o  o  c 


rN!f\otrMr\     ooooir\ 
M?  On  t- ON  CO     ^C"*^t~Kr 

<S  S  O  G  <>         O  O  G  G  G 


&i  O  0\  O  0\ 
G  A  O  r^  O 


s««s 


''^©Q'^o      OirMTNOirv      iTNOooo       ooooo      qooqitn      irvQa 

«&§&«    SSSSS    8S8;^«    «&&&&    &&&««    &«5 


OOOOO        o  < 


ooooo 


^Ol^^o^^\      0!0<?i'^«r\      oa~MnOQ      ooo 

-COOJOm         QOOvftjCy        CO^MmiS        CQ-d-Q 
JCOOvOvCO         O\0vC00N0N        COOvOnCOCO         COO^O^ 


OOOOO 

NO  O  O 


!r\ooo(>      |iMr\pQ 

OMr\«^t-Q        t-^  5»^ 
cOOnO\OnO        O^Oi&^Ci 


)000   OOOOO   OOOOO   OOOOrH   oooo 

jriifMTvOQ      ^*^^  f^S.      o  ir\  jf\  ir\  ir\      jrvoj?"^ 


!SSS 
i  6  6  6 


>SoO      ooooo 


d  d  d  d  d 


>  O  O  O  O  O  O  rH  < 


OOOOO 


CO     tecocoSco 


OOOO 


»0         OOOOO         OOOO 


!.«S 


vO(0  •-«  r- 


^^4S 


00  r-o 


t-eooo 


S  tH  pr\        S^  "AlRSS         rH  ^  CO  ! 


OJ  tf\o6  -^5      SocoZxFr-      5r-v6o5r—      o^cr-cor-      *?v'?\d5  F-\4 


\ONOvo  vO'O 
CvvO  O  ^CO 


OncO  iJs  O  O 


3  VOVONO^O 


jvo        >X>\0  t-^O 


&;»«? 


)  ITN  OJ  «-H  »f\        »H  ITS  CTvO 


8    8SJ; 


o  o  o  o  o      o  o  < 


o  o  o  o  o 
<>  o  <i  O  <D 


ooooo 


oooo 

>  cy  KN  ^  .»r\ 

d  d  d  d 


ooooo        OOOOO 

^OsOnOOn        O\0\O\0\0n 


I--VO        \OCO  ( 


OOOOO 


OOOOO 
OsOsO  0\0s 


d  d  d  d  d 

O  O  S  O  G 


OOOO 


>0000         OOOOO         OOOOO 


d  d  d  d  d 


OOOO 
0\G  0\0\ 


7\^ab\ 


S     2 


OOOOO 
O  O  O  J--* 

ooooo 


>  O  O  O  O 

s  OS  OvOsO\ 


ooooo      OOOOO      ooooo 


O  On  J  CTnJ- 

d  d  d  d  d 


OOOO 

OvO\0\^ 
-*  -*  (/N  uS 


OOOOO         OOOO 


O  IfNOvO  < 

d  d  d  d  < 


?53AS 


»0000        OOOOO        o< 


CO        K^^O^O^  r 


cjvo-*oir\     ^^voco* 
ir\MrHt~-o\      t^in»f\oi 


^0^0^0^0^0 


NvOCOKNrH  .-tcyOM?-d' 


^KPS^? 


IfMTNVOVOvO 

vo  vO  vO  iTvvO 

v£)  (TwO*^ 

VO 

^OU^^O^O 

^ 

^OvO^^CU^ 

^o,r^,r^u^t- 

^0^0^^^0 

^^ri^Si 

COvo  W  trx^ 

«SiSg 

t-i 

S^SS 

w 

?;25^^? 

•ssss^g 

£2gi« 

\0S0\0V0S0 

\o^\a<^so 

>OVD>0-i 

-o 

^O  ,fN.OvO 

^O 

^o^ovo-o^o 

UMn%oin-o 

IfN^ONO  -O 

asKMTStH  .H 

S«SR^ 

O^  OMT 

Slot 

^ 

sss&s: 

M58^ 

mvo'O'-o  vo 

V0>0V0^V0 

^^^^ 

VO 

>o>o-o<o 

^ 

•^-^^^"^ 

"^'^-^'^^ 

"^^^'^ 

Sf;3?,:^gf 

SSSlR^ 

CVJ  ^  ch  o  ^ 

?^©^'iS^ 

3SSSS 

l^gpSS 

PiPS^ 

t^S'oN&Jirv 

PSSS^S: 

«£fi;i?i 

^5^««s^ 

o«o  CU  -a  •« 
cy  ir»\o  t~-  0\ 

2!&?,^f( 

SP«^ 

O  ^  .H  ^  Oi 

tr\tc\tr\^  ^ 

ITNO   UAOCO 

(uco  r-o\ 

<^S.»»S 

ASSSS- 

«5  vo  5-5-5- 

5^?RJ^R 

?vt;^SS 

3«S3S 

ARS^RS- 

r-a   r^   rH   >H   r-4 

i?vS&SS^ 

SstySS 

5^55S« 

3?;ass 

KSSS 

I  s  s 


8.^ 


U    9i    fO  C    U  *> 
Of  ^  a        a  d 

O    •    O    o   -• 


£  <^    N    ^    U  S 


Impact 


443 


3    ^5i 


^  5  tf\o 

5-1.      a 


I.  o  I.  g 


i    b 


e  M 


sa 


^o^o<^      w_3-oc\r<r>       H-v^r^r-C'      c\i<Dir«0'_i      o  <y  <o  r^  o^      to^xyo^O      -^oocuo^ 
OrA<-4        »Acy<DCO^^        .-i»A^(Cr*        »AnO  u^^O  f^        iANi5<Dr^t4       <^-^'i*d'l        tOlAcyO-'^rH 


s-&^  J?*:: 


^^r--^  IT-raCV-jr-  O-  O-^  O^  CD  r-  Q-^COr^(D  .-1N^5'<] 
>l^_:j_:J  CM  »^  04  lA  »'^  K^_iJ■^0  ^  K  irvt— (^llf^ey  jknO^ 
!  ^  ^  r^        O  <-I  "-^  d  -i        o  o  o  cy  »A       CJ03»rirA|A        K\_5-:Jc 


KM^-iT      -:t-:J^ 


o^uMAr-      ^NOr-r^cjc 


c3^!C   T?;s;^^S,  iSStRSS   ^885^_   ^^^^^   ^.'<;^^?    ^^^^^^ 

odd      G  o  d  S  o      o  <5  d  S  <i     ^  ^  ^  ^  ^      ^  ^  .-i'cJ  d      <3  d  d  d  d      d  d  r^  i^  oJ  oJ 


<-:jcj0^co       l/^c^^-K^^-      t-KDcpOK-      i'^iai/nJpc      u>o_^kv-^      t-o^  iA_:»qsoj 
<a-.  rAw^       r-roifNKNCvj       ^^O-rJw       WptnIaO'S)       ^^Ti^l^        N  r<  c  Kl  nD  if^ 

sojcoa-      aomo^co^      eoo^o^too^      (ocotddi-I      odt-<<Hr^       Jw^ooo^ 


iTvJ  l/^      <D-Oir\ot--       r-«<p<tta-      c>rr\K>r-iA      h-r-K\<\)t-      Jirs-O^oeM       ir.cy^Kv^ovO 


CO  CJ  lA  WCyflOC^  ^OK^K^^OO^  C>>0  ITNCM  »^  CyODO^lAi-*  I/MA0^«0  UN  lf\-J»^  oo-:tu\ 

«;>Aj  ./u^u:,-:,;  crooad^  <^°'£jaa  s'si'^d;!  S'Sis^Si  Sji^2;^d 

c^'>_J  o^c^_^OKv  K^K^aiKMJ^  irvOiAWETs  SCt-u^f^t:  tttf^iC^**'*'  Cil-J-4<y  5f^ 

(vj  K\  v"-  K>M^j(M^  r-sOf^r-r-  t-mc^o^ij-  coo^r-eoo  o  IS  o  <J  o^  oo^»3eoO'-< 


)00   ooooo   ooooo   oooo* 


r^f^o      ocvioovo      sooNOt-'^      r- to  ir\  .-•  no     -aM~.f-r^o      r^NOK\o*t*     NOK\r-^ooo 
KN^O  IT.      iA>ocDKNO       o  (o  H^  ■-' -<      >^c^<^i<-•^*^      ocj'^_:j_J      i4dcy_:t'-<       H^cy  J '*^^'*^ 


g;i?;?< 

S^S^&IS? 

ceo  o  cf  on 

Kf:S:£& 

ggrgl^SG 

8(!?S:t8( 

&S^&«8 

ooo-o 

0000-- 

d  d  d  r*  d 

O  K\0 

-:?0_3I^^O 

OnO  r>-  HNsO 

KNW>o  K-r- 

a  K\0  O  H^ 

^t-'-^t^  f<^ 

h-n0-3O.O-> 

J«^j 

irv-3^m  O  CO 

CDD^r-O) 

S=;£JS2 

rH   HNCO  <D   KN 

iC^:C;3S 

J^f^   lACO  C^'^^ 

oj  cJ  <y 

^-SJCPS 

•^^  "C- 'Z. '^ 'j> 

&:8!8*'?P 

£Sr?,S,S: 

a&2i&& 

S;8!2iR8!:: 

o  o  o 

d  d  d  d  c5 

d  d  d  d  d 

^r-l  ^  l-l  d 

6  6^  6  6-> 

W»S»S  SS*SS  MiSWW  WUblU 

•-•^(D-oo  ir\*o_:}a>o  t^or-r-'O  o^sO_:jw 

cjwJ^cj-i  ^ojfAojcj  soojdir^  ><5sdojd_:J  lAJ  ct*  ^  ^'  ^  vo  J  lA  d  »A 

WcS^S  SS»**  Cd3ESM)M  MMWW»  S3«*»  »*»»»■• 

^0^'000  r-to-^  —  cy  r-«lr^lJ^K-cJ  (MOfojt-  Jir\r--H_^  •^'^Cr'OQI-^ 

ddddd  ddddd  d  d  d  d  d  d  d  d  d  i^  Jd<-t--*^  •-loi'J'Jdd 


>NOrHO       o  r^  (c  qi  o      «'-«KNr-t^      <^^-<^K^><>       o^r^wooq 
tddd      ddddd      ddddd      ddddd      d^i^d^c 


'_j      iTico^'^r-      ir»f*-c^a)(0      P'^r^vo^     no  iS^t^'^'Ps      t^"^ ir\tf\^      KN?*a>Pbtfs 


ixsa   f!;»;3x?;R  g;«s.33  r^:iv.s  sv^mss  ^ass^^z   ajf^ssis* 


-<o<Df-^<D      r^r^i^cd      0^  cr  d  d  d       dl-Jdo^c^a> 


t^r^r-      t^r^i-ir^ri      riflj^f^fl      r-!f^t^(^t^      t^^^t-^r^s^     ■^5'3■^^45^o      ^<J><Jrl-^<oflD 


tr^yc  o      ^Ol/^cy-9ao      <y  CO '^  r*  K\     K^<^K^H^o^     ir\^  itmTi-o     -:jo_:T»rnr»      cd  _^  e  o  ir^^- 

^_iJ      lAr-OKSKN     J  d  o  a3  (^      cy-i<-J<y>o       qjt-Icr'^t-^      d^cJ»d'^       coiAt-Jdcr 

^,4^      ^  oj  cy  oi  CM      i^K\»r\_ij     ^uma^'O      ^-^-l^^-r*-      i^  co  to  o^  (t^  &« 


8S3   a^ix::^?;   r^-s.^s.:^  ^^:^sf,   s««2c3   ss^g^   ^i^::^^ 

^N-^       •Hhfcycyp^      cycycycyn       -^ojcy^fy       ^  ^  *h  cy  oJ       ^olwcgcJ       rJc^ci'^^'^ 


o  —  —  S  a" 

**  *  c2  «  odd 

•  ♦*  O    1. 

a  (-     O 

♦>  3  u.  J-  «  «« 

*  .„>■£■£ 

a  fe  St  ^tifc 

C  Ti  "  I  Its 


.3 


Ml         ©         «v.OOOO       «• 

I   i   s  2||  t  IS 

♦»        ,  •   ».  u      —     —    c 


"^       o       12  a.     ** 

d       5       w        ©'Ot^O      •£ 
tf        «•       u        cy  <C  irvcD   -^   ^^ 

^  ii?  ♦>       I-       i^i^i^w^     «    n 

it   s  Si 


o  Si 


:    a 


a  IK  M  t 


J85 


55fi1 


II 


444 


Impact 


ir 


4^  u  a 

.  „ « « 


as 


&  o 


>■   o        e 

<  g    B 

(i        (0 


o  t-cu  J-  r- 

ni  tM  ovr-CT. 

C-OCO  Ovo 

W  OvOCO 

o 

t-o  r-<-«  w 

«r\co\o  iTM^  ir\ 

CO  -  t-JOO 

2215 :5S 

.-1  ir\0_J  <Tv 
rH   r^  rH   CJ   •-. 

K^aS^ 

IR 

pr\0  Cy  (TNKN 

ar^sis^?; 

K^Sg^tR 

SS«'i£« 

^«S<Ss^ 

SSp^S 

R 

?^82A1R 

O   W   g;OC0   W 

OOOOO         00<H0^         0<H.H^»-« 


iHOJCyWiH  rHOOr 


-OCO  t-T- 

J  vi)  t-r-o 

^  j^  -»  r-^ 

^-o  <T.r-cvj 

O  w  r-«<^ 

to  J  K\.-l  lf^<^ 

'""'-^'""^ 

loas^"" 

rH   OMAH^r- 

OOMDOCO 

®'w  12  S  w 

^  S^KNKN.^   ^ 

3k«g:s^ 

SiSSSS 

SS81SS 

irN  iTvmo  J- 

S«S«?^ 

\^  8  CM  CO  r^& 

OOOOO         O"-"©©©         Or 


)  O  O  O  O  Or 


1^\K^^-JCT^      ^r— Onc\jct\      r-ojONtcvON      cjvooqOcj       •-t«H\0'-ta!)t 
r^t--t^r-r^      r—t-^r-cot^      aacor-coco      cococoovco      cor-r-cococ 


I    t~         VOJOJO\        (OCOr 


)  r- r-      t— r-cor^cor- 


\0<00c0^0         r*-CO»HONO         OOCOOO        0^  0\.C^  CO  OS        Os  CO  c 


O   OOOOO   OOOOO   OOOOO   OOOOO   OOOOO   OOOOOO 


>   O  ^  ^   r^ 

.H  r-  cu  -.  so 

vo  r-r-o  r- 

CO  l<^r-co  cvj 

CO  w  -<voco 

cj  cu  K^K^K^K^ 

■"'^'^'^'^ 

coco  O00>O 

\0  CO  .H  KSi-t 
.H   rH   r-( 

I^^SJ^S-S 

f-l  OCO  Ov.-. 

*H  fH                 >H  »-i 

58^^^ 

f.'KS^J 

3  ^'t^<£^ 

Si.S»8(S 

pis  A3  pi 

SS5S-SS 

>  o   o  o  o  < 


)00   OOOOO   OOOOO   OOOOOO 


■f-cocovo      ^-c^ou^co      f-cocoiAco      r-co^^t 


:o-a.os     ^JF^. 
i  o  cJ  d     6  C3  ( 


)00       OOOOO       o< 


3:  X  S  M  3 


IS        3WS3W        33333        33333 


•g      s 

£        E 


•as 


5SSWS    WWWW5    S«»SW    33XSX    »»»»3    WWWWWS 

j-om.-!^       r-irNrH^Nt-^      ajcvjo<2-a       r-FTMHOOs      rr\corHO'0       o^cy_*g;G 
O       i-ic\joorH       .-(fr\00N-\      OrHi-HOo       J■K^^^^^f^^-      j'^oONr-io       •h\ocO'AO^ 


)00    OOOOO   OOOO.O    OOOOO    OOOOO    OOOOOO 


\  J' vo  uS      \o-^kSooco      ^^or-CT^-d-       cjONCT^r-r^ON 
>  d  o  o      cDoodo      csddoo      ^dddcDo 


JVC      tr'*^o-Tt-*      '^iOSyc-"^      lAt-j'Cr'O^ 
^ao       &\r-r-ir\<-i       t^o^o^Jt^      kP,ojcjOocvj 

jvo      -^^^o^t--      ^o^ot^r-^       r- r- t^  r- r- c— 


SSS^R 

g^ass 

8 

J  Oco  O 
.H  cy  K>oj 

S3"R;^ 

!R^?,^S 

S8S2^^ 

cssss 

5;iS<^S 

r- 

.-t  h-vO  --* 

SJSSSS 

t-r-coco  r~ 

r-  r-\o  c^  r-cD 

OJ  1?\'3  O  f— J- 

to^sovo  ./^ 

~^*^^^ 

vo 

-O-OSOVO 

sO>0>0  IIMA 

'^'^'^^'^ 

r— r-  r-  r-^  ^o 

CO  .^t- so  .A 

or-c^J^-.- 

CO 

^-r^^<0 

OCDC^SO.* 

so  o  O  t--  lr^ 

^O^Os^sO 

1  - 

p.     a 


itt 


^tt  ■  s 


-So, 

O    3    S 


£..1 


1 


. 

u« 

aioim 

CUBS  11^-6  {snuM) 

SRID 

«.r.t. 

rhj^^^ 

IKII  SIRiSSn 

sna-iHPLiTniss 

U 

innw  antnsxs 



8p..l 

«.rt 

Eon. 

mrt 

E>ut   (Urdu- 

«r 

;'^1S. 

„ 

'';^ 

:fL"'B, 

mT' 

lot  Qlrd«r 

?«»1 

OirUr 

Jl? 

M.F.H. 

lUP... 

P»rt 

""SlSi" 

V.P.B. 

But         ««<t 

Btr... 

Str„. 

SJrt 

BtTM*       Dg  l2 

ItoBOlflw 

atr... 

\^ 

ll.Rjri.r 

6trM> 

^y 

lhEnin*r 

Qlrdw 

01r.w 

P.r 

Pw 

c«l.l 

5 

7              8              9                10          11            12          13 

11*            15                 16 

17             18                 19 

20           21               a 

23 

21. 

— 2r" 

28 

18.9 

1.31i 

u, 

7.75 

" 

" 

" 

0.20         0.01 

0.20 

0,01 

0,20 

7,21. 

8,52 

0.7)         10.U 

0.20 

2.5 

1*7 

El 

2.13 

7.QI1        6 

59 

7.82 

0.2U 

5.2 

0.22W 

0.75       o.lli 

5.20 

0.92 

0,19 

I..8U 

1 51 

16  I 

S 

0J|61> 
O.U75 

fc2? 

7.26        ( 

I49 
6I1 

l:« 

0.J1 

O.OliW 

5.V 

olej       0.25 
0.92        0.J2 

I+.95 
5.32 

?!" 

0.25 

ojj. 

5.21. 
2.56 
5.09 

2:E 

0)295 
0.J80 

2^88 
5.00 

\'Jk 

9.32 

9.37 

1.07  15.2 
1.06         15.1 

i"» 

li.,B 
I5J. 
25.3 

130 

Uo^ 

2.»5 

O.J^ 

luTl 

6.70        8 

4 

7.62 

o.ot, 

0.5 

o.sew 

5.0if 

2.6it 

0  87 

1  98 

0  87 

2  26 

0  5) 

1J.0 

17  2 

129 

ia.6 

?jS 

luM 

6.65        » 

25 

7Ji5 

-oil) 

0.J5* 

l*.6ir 

0.97        0.)5 

1.56 

0.1.7 

3.32 

5.10 

o.e;      n.8 

2.15 

?1 

a 

hs.t 

3.85 

0.U78 

1>.61> 

6.75        8 
6.31        9 

59 

7.67 

o:S 

1.2 

K16W 

15I5W 

0.7;        0.?9 
1.22         OM 

1.1*6 
2.55 

0.53 
0.57 

ts 

o°:SS 

5^56 

?.H 

10.05 

o.W  6.1 
o.lfl        7.0 

1.95 
3.97 

23.8 

1.8.9 

122 

S.5 

3.70 

10,0  8 

0.1i61 

li-Tl 

6.26       e 

7I1 

7,50 

-o.oe 

-1.1 

0.70* 

9.21' 

0.58      0.55 

1,06 

1  oe 

1  38 

0  80 

7  (» 

9  77 

iW 

\t 

OJtSl 

k.75 

6.36        9 

2.1. 

0,61.11 

S:2?    1:11 

U.i 

7,58 

».J 

t.2S 

9.5  « 

0.1j61 

U.71 

6.52       9 

te 

8,75 
7.87 

0.29 

3.8 

l.OJW 
0.9eir 

0.79        0.71, 

2.55 

5.26 

5.35 

0.850 

2.92 

15.60 

1.75         21u9 

5J.B 

67.5 

7.09       5 

0.97 

11.5 

O.76H 

l.Jl        0.81 

2.1.5 

2.31. 

o.l«eo 

1^65 

1:2 

1£0 

MS 

5.6  1 

0.1*65 

7.00         8 

26 

7.63 

0.05 

0,7 

o.ww 

1,2W 

0.97        0.90 

1.08 

1.B9 

1.22 

1.1.5 

1.06O 

1.55 

8.55 

1.51       21,2 

25.1 

19B 

67.7 

U.60 

2.2  B 

0.519 

U*7 

6.71       9 

86 

8.29 

0.71 

9.3 

o.9aii 

12 .9W 

\M        0.92 

!:S 

2.39 

1.21. 

1.92 

1.92 

1.060 

1.78 

8.50 

12.25 

1.16       20.7 

1..H 

50.9 

JS 

S:S 

U8 

71.0 

5.M. 

5.3  « 

lu65 

7.1.7        6 

69 

0.50 

6.6 

0.I1W 

0.97         1.01 

2,21. 

1.37 

1.6) 

1.61 

1.190 

1.55 

B.W 

51-7 

200 

72.1 

5.1Z 

6.2  • 

o.l« 

14.70 

6,22         8 

71, 

7JJ 

-0.10 

-1,5 

0.721* 

9.5W 

0.78        1.05 

0.92 

1,65 

1.1£ 

1.16 

1.22 

1.255 

0.99 

6.16 

10J.0 

I  12       15.9 

2  28 

S.l 

5.W 

I..OS 

Ud 

e.al. 

J.UK 

1.11. 

9J.7 

2J.5       51..5 

5J.5 

2Qe 

79J. 

5.« 

lu56 

1J.90 

K:J 

0.W0 

i:g 

9^.7 

2« 

BS^ 

5.» 

U3  1 

7,15        9 

IB 

8,16 

0.5a 

7,6 

OJiJl 

1.18 

2.72 

2.16 

1.595 

11.90 

5.78 

ali-0 

0.1i60 

It.  71 

6.70        S 

7,80 

0.22 

2,9 

o.si." 

7.1W 

1.70        lj,3 

lel9 

2,11. 

1.95 

1.11 

1.92 

l.«0 

1.11. 

8.W 

ii.oe 

1.36       19.5 

2.90 

f^:Z 

U.69 

1.W 

2,)B 

1.715 

1.39 

8,55 

12.15 

1.51       a  J. 

lu05 

SOU 

7.5W 

3.01 

1.97 

1.53 

2.56 

1.715 

1.38 

9,05 

2.01       28.5 

1..S6 

56.2 

tJ 

&; 

ae.o 

6.23 

oj.77 

luU, 

6,61       9 

u. 

7,88 

9.1W 

1.16 

2.72 

1.50 

2.26 

1.21. 

8,1.0 

11.86 

206 

^•1 

1  1  1 

8.51. 

12.6 

0.70R 

9.2W 

\'Vl     ^'V 

0.77 

2,97 

2.12 

1.1.0 

2,09 

1.81.5 

1.13 

8J.5 

12.79 

IJa       20.0 

l.,«7 

57.5 

205 

6.35 

U8  8 

o.iae 

u-a 

6.99       9 

3" 

8,19 

a.o 

0,61» 

B.OW 

2,87 

2.16 

1.53 

2.22 

1.880 

1,16 

12.26 

l..li. 

t  eirdw  0.01(5 


LOCCdIOIIVE  CUSS  1 


Ihaor^tMl 

xux 

ntssu 

SQU-AUPUTDDBS 

HUDTK  mutU                                \ 

E> 

t  01rt.r 

<•!«  Olritr 

Avsne 

•  Both  Olrdarc 

tut  OlnSer 

•  •It  0 

r4..- 

LMd«4 

Anrftft* 

Sj»,J  ttrnt 

Boll  !«.rt 

7r.o 

k  kcd  Bkm 

T1.1. 

i  ud  Suaur 

lR.Ct 

^««t 

SPUD 

timsigi 

Ibu 

fr^^wnaj 

E*>t 

<m  BTfae 

t 

B 

at  Sft— 

t 

la 

DtfUvtl-m 

k«t 

»..t 

P.r 

Dti^uIo 

Dr>^o 

"n'^ 

Dja-'.o 

BMt 

h. 

■.r.s. 

«.P.S. 

Put 

laabca 

v.p.s. 

CH..«.r 

01r8>r 

...I 

Str.M 

Cut 

Btnww 

Crt 

Str<» 

"b" 

lk8»lPln' 

"'•" 

°b" 

ll.e.Ul.r 

""•• 

kh^lPln- 

Olrdor 

Glrd.r 

Stroat 

o«rt 

BtrM. 

Cnt 

CUl 

2              5 

1. 

5 

6 

7 

8~ 

9 

10 

U 

12 

19 

11. 

15 

16 

17 

18 

19 

20            21                22 

^ 

21. 

« 

24 

27 

28 

153 

U.e 

ajo 

0t55« 

tia 

8.16 

6.99 

8.58 

» 

0 

» 

0 

0.96 

0.31. 

0.95 

6.52 

9.93 

0.34 

Ibl. 

U51. 

9.8 

191* 

9.0 

aTi 

e.9« 

8.81. 

8.60 

0.0« 

0  2 

0.171! 

2.08 

O.IJ. 

Sg 

0.1.9 

8,80 

9.28 

0.61. 

7.8 

0.29 

5.2 

155 

13.5 

1:?5 

s:a? 

1..1.0 

8.60 

8.69 

e.TU 

0.14 

1.9 

0.26B 

3.0! 

0.1.8 

O-llS 

9.09 

9.99 

(1.95 

11.1. 

0.91. 

3.8 

150 

19.5 

1..59 

8,<e 

9.58 

8.60 

a22 

2.6 

o.^a 

tJW 

0.M 

S79 

0.78 

Vi 

5.51 

0.72 

0,13 

5.50 

9.11. 

9.52 

0.96 

0.B 

10.9 

157 

150 

25.0 

1.96 

0.5^ 

b.51 

8.65 

iai6 

9.1.0 

0.82 

9.6 

0.51" 

9.611 

0.1.8 

0,19 

2.55 

c.lA 

1,61 

0,1/ 

0.21 

2.15 

8.81, 

10.55 

0.66 

8.3 

1.54 

15.1 

2S2 

1-99 

0.5I.J 

kJ9 

8.1.6 

9.62 

9.* 

0.1.4 

5.U 

0.16» 

1.91 

o.U. 

0.19 

2.92 

0.91. 

0.25 

1.96 

fc59 

0.22 

1.79 

8.1.4 

10.  U5 

0.90 

3.7 

1.1* 

16.2 

lis 
lbs 

29.1* 

2*52 

S&' 

Ito57 

7.82 

9.76 

8.79 

0.21 

2.U 

CSS" 

6.5» 

0.1.8 

0.24 

1.85 

0.66 

0.59 

2.06 

O.SC 

0.50 

1.96 

8.52 

10.  M 

0,14 

2.0 

1.1.6 

16.2 

fe? 

8.75 

1^55 

6.26 

9.58 

6.92 

0.'91. 

Vo 

o.a.11 

2.8IT 

0.61. 

0.56 

1.T7 

0.51 

0.17 

1.06 

0.51! 

0.1.2 

1.1.0 

M* 

10.1.0 

0.1.0 

I1.9 

1.1.1 

15.7 

U47 

3.18 

O.5U5 

1..59 

e.oe 

9.61. 

8.89 

0.25 

2.9 

0.59« 

Ib6> 

0.61. 

0.1.9 

1.91 

0.78 

0169 

1.21. 

0.56 

1.2e 

6.65 

10.90 

0.1.9 

6..0 

1.91 

U>6 

1?! 

U-5 

3.28 

0.551. 

1^55 

7.87 

«>5e 

8.72 

0.11. 

1.6 

O.U.> 

5.W 

0.51 

0.52 

0196 

Ob  1.4 

0.67 

0.69 

O.U> 

0.59 

0.61 

8.U 

10.06 

0.25 

5.1 

1.07 

U.9 

U.0 

5.32 

Ou53< 

IbU 

8.16 

9.76 

8.96 

0.58 

U.U 

0.3r« 

0.90 

0.55 

1.70 

a95 

0.68 

1.1.0 

0.92 

0.61 

1.52 

9.01. 

10.69 

0,86 

10.0 

1,70 

1£,9 

im 
151. 

ise 

W.9 
It? 

1A5 
U7.0 
1.7. 0 

5.W 

J.  71 

5-71 

a  552 

I..50 

I..UO 

7.68 

10.26 

9.07 

0.W 

5.7 

a76ii 

6.^ 

1.26 

o.5« 

2.17 

1.45 

0.75 

2.20 

1.1.4 

0,64 

2.20 

9.11. 

11.90 

0.98 

12.0 

2.91 

52.1. 

a.521> 
0.5« 
0.551 

7.78 
6.90 
7.66 

e.ce 

9.38 
10.16 

9.86 
9.82 

8.77 
8.95 

-0.05 
0.19 
0.57 

^).6 
2.2 

1^5 

0.5^ 

ol67" 
0.1.5" 

Ib» 
Ukl" 
7.6» 
5.211 

0.97 
1.17 

0.80 

i.d. 

0.61. 

0,65 

0.64 
0.64 

hfo 
r.58 

O.U. 
1.72 

0.85 
0.85 

0.52 
2.09 

1,16 
1.26 

0.62 
1.38 

^1 
0.76 
0.76 

1.58 
1.70 
0.62 
1.82 

I:S 
8.50 
9.09 

10.11. 
10.16 
10.  JO 
11.57 

.0.10 
0.31. 
0.» 

7.1 
-1.2 

I..2 
11.U 

1.15 
1.17 
1.51 

19.5 
£4 

2S.7 

1^ 
151 
191 

1* 

iM 

1.7.2 
M.U 

W.7 

50.2 

5.72 

5.TU 
9.91 

2.51 

0.51.5 
0.5Z2 
0.5« 
0.5M 

0.579 

1..59 
kU 
I..92 
I..52 
1^27 

7.^ 
8.22 

e.oe 
8.5* 
7.75 

9.98 
9.96 

10.1.0 
9.5! 

11.52 

8.78 
9.09 
9.21 
8.81. 
9.52 

0.20 
0.51 

S:?6 

0.91. 

2.5 
5.9 

7.3 
3.0 

0.72" 
o.uun 
0.75" 
o.t«i 
U3* 

6. 1.11 
5.1« 

e.7» 

0.9" 
15. 8W 

0.62 
0.66 
0.61. 
0.97 
0.58 

0.66 
0.67 
0.73 
0.7U 
0.75 

1.21. 
0.98 

l'.51 

S:r6 

0.70 

ilu 

0.84 
0.87 
0.95 
0.95 
0.97 

0.67 
0.67 
0.71. 
2.15 

1.50 

0.70 
0.62 
0.67 
1.50 

uoe 

0.76 
0.77 
0.81. 

0.92 
0.61 
0.80 
1.77 
1.18 

6.1.4 
8.81. 

9!  28 
8.91 

10.50 
10.5I1 

11:2 

12,76 

1.22 
0.15 

9.7 
8.5 
-0.5 
11..5 

1.51 

2.67 
9.79 

16.6 
17.2 
29.8 

i» 

190 
lis 
IM 
UiO 

51.!. 

wot 
t25 
1..29 
It.  50 

1.0« 

5.U 
7.U 
2.08 

o.l« 

0.528 

0.591. 

0.528 
0.525 

IbU. 
lb  1.2 
U.IM. 

7.78 
7.9T 
7.72 
8.U1 
9.18 

10.50 
9.96 
10.91. 
10.26 
10.61. 

9.U. 
8.96 

,'o:l 

0.1.6 
0.58 

ill 
1.U5 

8.7 
6.9 
16.7 

0.*)! 

0.5« 
1. 16» 
0.IJ11 
0.51.!. 

11.01 
6.5" 

■IS 

0.95 
0.56 
0.66 
0.90 
Lorr 

0.79 
0.87 

0.97 
l.ffi 

0.61. 
0.75 
0.5» 
1.05 

1.16 
1.96 
0.87 
0.78 
1.28 

1.02 
1.12 
1.11. 
1.26 
1.92 

1.1U 
1.21 
0.76 
0.62 
0.97 

1.06 
0.96 
0.76 
0.61, 
1.18 

0.91 
0.99 

1.12 
1-17 

1.14 
0.97 
0.75 

6.70 
8.54 
8.94 
9.26 
8.12 

11,66 
11.28 
11.01 
11.03 
10,84 

.0.51. 
al.0 

0.20 

U12 
•aoU 

6.4 
1,.9 
2.1. 
13.7 
-0.5 

2.67 
2.29 
2.82 

£.01. 

ue5 

29.7 
n 

22.7 
20.6 

12 

60.0 

U.7!. 

6.9. 

0.52s 

^i*! 

8.16 

9.52 

8.61. 

0.26 

5.0 

0.J9I 
0.22W 

9.01 
2.6II 

l.U» 
0.7s 
1.6» 

0.95 

1.08 
1.26 

0.88 
0.69 

i'o? 

1:§ 

o.» 
1.27 

U14 
1.60 

1,21. 
I.U5 

0.91. 
1.11 

9.06 
8.2U 

10,88 

ll.W 

o.se 

0.06 

11.9 
1.0 

1.89 

21.0 
27.0 

6i.,e 

5.12 

2.21 

0.525 

U.1^ 

8.12 

9.58 

8.78 
8.92 

0.17 
0.1.6 
0.20 
0.91. 

2.5 

IbO 

1*60 

1.92 
1.99 
1.52 

2!2l 

1.71 

1.29 

1.90 

1.25 

10,11 

11.81 

■•s 

23.9 

2.82 

31.1. 

159 

U2 
158 

71.2 

5.25 

a7» 
9.a 

0.526 
0.550 
0.5U. 

lull 
t59 

6.50 

8.1a 
6.96 

9.58 

9.11. 
9.1.8 

o!o6! 
0.1WI 

1.U1 
1.12 

0.71. 

2.1.3 
1.96 

1.79 
1.94 

t^ 

1.92 

1.51. 

l.'7l. 

1.20 
0.80 

9,82 
9.72 

ii.E 

0,64 

0,54 

8.1 
6.9 

tu 

28.6 
27.0 

181 
ISO 

72.8 
75.7 

IF 

9.7s 
5.7« 

0.552 
0.B9 

IbUo 
li.35 

6. 50 
8.91. 
9.01. 

9.1.5 
9.08 
9.59 

8.96 
9.01 
9.18 

0.60 

5.0 
7.0 

o.oUi 

0.97s 

o.90« 

0.5W 
1^98 
5.5s 

1.16 
1.60 
1.66 

1:51 

1.62 

0.79 
0.99 
0.91 

2.68 

2.05 
2:91. 

0.97 
1.16 
1.15 

1.58 
2)17 

iz 

0.87 
1.07 

9.67 
10. 5U 
10.90 

11.57 

11.72 
12.00 

2.11. 

6.2 
29.2 
26.2 

2.98 

2.79 
9.01 

90.S 
59.5 

^!*_ 

'      ""' 

— ^^ 

'- 

' 

uvt  2L  M 

•  t«k«B 

rro«  T»b 

.    6«.d 

•  r.  th 

.  ...r.1 

.  oru 

.  l.pu 

>l  b.tto. 

fUne*  Btn 

■  ■  for  MOh  gird 

■■■ 

tlM  th»  plna  kr«   In  pocltloo 


»  bMdpl  S«uti,. 


„ 

Asmoi 

STITI 

snssses 

Ea 

at  elr< 

•r 

8.16 

A 

«nc* 

8,58 

le««fitrl< 

ItT 

•  TOlu 

0.051 

0-^55 

0 

0.065 

0,951 

" 

Impact 


445 


s 

'O  ^K^a  a 

11.1 

9.1 

11.1 

10.2 
8.0 

SSS8t3 

n  1 

8 

«S8 

oo  o 

o  o  oo  c? 

5ff.|f 

^^^^^ 

§55^* 

«^SS2 

8!P8  88 

8^81? 

M 

«^   i 

a 

ft 

o  a>o  o  o 
o  o  o  o"  o 

«0  UVKSJ 

a^»»8 

o  o  odd 

!9Sa8^ 

do  o  do 

-»a;3sa 

8i?^P4 

»^^€2 

,*oo'o',- 

i 

h- 

SP^S 

ss-gs© 

B*»&» 

8S58»§ 

KBSSfS 

!^SI!^3S 

?i!?;8!,f!iS^ 

?!«S(C; 

jjj 

JJJ-S-S 

_ct_^ir\-3j 

ir%_3ir\^^ 

JJJJO 

"^"^'^'^'^ 

l/MrSirMTMTS 

ifMA^irs 

til 

nO 

^^?^^ 

-4-5-5^-a 

g^SsJR 

-5-5-3-3 

sill 

15« 

» 

ss:- 

«Njir.ir.iiN 

u^c^o^O'0 

WK\K\^^ 

-5-3-3.5 

2m 

t3 

ooo 
o  o  o 

oo  o  o  o 

o  o  o  o  o 

do  o  do 

88»8S 

8888» 

c?o  o  o  o 

a»»8.8 

o  o  o  o  o 

8888. 

o  o  do 

i 

l|     1 

S 

www 

31S11 

.3-3J.3 

i 

a 

ooo 
o  do 

2»888 

8R^»» 

8.8»88 

88SC88 

8888S 

a»!?88 

O  OOO  o 

8i58.J5 

oo  oo 

^1     1 

a 

322 

tUKN-Jt^-a 

S»S88 

8!?^»» 

O  O  O  O  O 

J-JIA-O  UN 

8.8»^» 

do  d  do 

8  8»8!5 

8888» 

MinKvJ-9 

a»»88 

do  do  o 

8888 

o  o  o  o 

jll 

. 

J^kl^^K, 

W  O^KvW 

s,aRa^ 

agHS,p 

^o5.8^ 

:s»i3soa 

68^15 

S        8 

i   1 

CO 

o  o  o  o  o 

Sim 

o  o  o  o  o 

o  o  o  o 

o  o  o  o  o 

1411 

o  o  o  o  o 

o  o  o  o 

1  ^" 

<j  .^o  o  o 

O  W  O  «H  r^ 

^^:^22 

^^^^_o^ 

KNJUNO-J 

-ijiAcIrt 

1    i 
1    s 

>o 

S&&IP8 

o  o  o  o  o 

^8»^S 

o  o  o  o  o 

m27 

o  o  o  o  o 

O  O  o  o 

i 

- 

11^ 

R^:^^4 

-Jj-3-aj 

RRSKR 

-5 -9-} -9 -3 

sepB 

4-5-3-5 

u 
'°s 

-a 

^»4 

SPfrRS 

P®$PS, 

spsa^ 

Si^^RR 

5<4k;5 

- 

?1? 

5873^7? 

'?1^'f«? 

;S3P»® 

5»#«a 

%m 

ii 

~ 

«j.O0J 

a«^33 

iii^^s 

irvcDNOtoo 

iSiiH 

li 

- 

S5§ 

§&«}»» 

essnig  inm 

»§«§«  3S;i3§  3^525 

SS32 

I    I 


6    i 

«  a 


8 

it 


**   ii     _   . 

•g      «  ^  V  -^  %  9      ** 

9    ^ 


'i  t     £■   '^ 


inis  Z^. 


^  I 

i   2 

=  I 
I  I 
I   § 


1^1 

'if 

Hi? 


o  a 


C  . 
<>  li 


i        8.  il 
|ii(jj:58   I' 

^  j.5-3~       -   g 

Q  *£  ^     5    S  • 

I? 

2l 

12 


446 


Impact 


I'" 


S3      t 


j:g 


US 


si     £ 


Isli 


H  O 


la 


gssiiis)   siscas^ 


& 

?.f.BS» 

SS&S^ 

as(ss2 

K7«8SS^ 

s^?i,;?,s 

OJ^S  tf<^ 

s^K^a 

^Sia 

^ 

AJRSR 

(O  J  CO  l»^co 

^  a?  ifMA^ 

coco  *^KNCO 

J  r- J  vo  K^ 

?,?^ASS 

«P^ 

■' 

rf  ^  -*  ^  -* 

^  J  ^  ,*  J- 

^  ^  ^  J  -* 

J  J  .rs 

<D 

jr  (v.  o. 

CN-  oj  ONr-a> 

or-oi^-< 

--.^C-VO 

OvCTvCWO 

KN^O   (VJCMOi 

OiCVvOmO. 

prs«,r, 

i 

ooS22 

2:^883 

gS2S'S 

ssg«:i 

S-Si^ic^S 

82222 

i^2aa2 

g«S 

ooS22     2^S&S    «S2ie8    £'S£'8:5    8; 


S2222     &Si'»2    2a: 


« 

2:022S 

222gl& 

s&sss 

28282 

8G222 

:Q22S8 

a«^ 

° 

oo 

OOOOO 

OOOOO 

OOOOO 

OOOOO 

OOOOO 

OOOOO 

OOO 

M  3  9  >  « 

3   3   >  3  3 

3  3  M        3 

3  3  3  3  3 

3  3  3  3  3 

3  3  3  3  3 

3  3  3  3  3 

3  3  w 

r^^  C^C?s^« 

irsvO  J'  ^Os 

r-  r-«rsco  ^ 

«^o.  oco  l«^ 

O  ^  O^  CO 

^  I^NO  o  o 

o  OJ  r- 

^  o  o  o  o 

«o«oj 

•-4  o  d      d 

J  rs  J  «^f- 

*^^  vo  *^  r~ 

o-oco«^co 

'^-^'' 

H3  3  3  S 

3  3  3  3  3 

3  3  M        3 

3  3  3  3  3 

3  3  3  3  3 

3  3  3  33 

3  3  3  3  3 

3  3  M 

o 

e8««8 

esess 

«S8o« 

SinSCR 

SSS38 

•SZi^filf. 

3-lSS;iS 

liSS 

OOOOO 

OOOOO 

OOO       o 

OOOOO 

OOOOO 

OOOOO 

OOOOO 

o  o  o 

J  orotooj 

0^  OvCNJ  OCVJ 

c^c^(y-cur- 

^CM«^or- 

O^^^CK 

^m-^oij 

^^^^^ 

K^u^  lA 

O  O  WCUO 

O  r^  -^.r^C^J 

''°'^°"' 

""^""^' 

"^■^'^"'^ 

ot-^r-i- 

'"~'^°~'" 

■=^"^2! 

S«2S3 

«&:£;^2 

sassa 

2SS!«a 

S«««S!, 

s#,2;r^ 

cc^-^^-cc 

5,0^ 

OOOOO 

OOOOO 

OOOOO 

o  o  o  o  o 

OOOOO 

OOOOO 

OOOOO 

000 

cS 

SSPPS 

3Pg;?°^ 

aspss 

£S£S« 

«»?;?» 

S8£8S 

CO  b>a5  -H  cr> 

&*a 

■" 

^^»^j 

«>  J  *^ 

s 

s?««s 

8iSi8«2 

g'SSSS 

?asisiAf; 

Aacrg:* 

S^S<3?> 

S-^KSiR 

R2S< 

S    ^S-^f^i    3*SK»    X5X5S    3K3:S*    S^SSaS    «SARS    333^8     PS2 


ir\(0  rsrNOv      Ov^Ofi^      r-(^o^<^ 


s   Sasss  sasaa   saaas   a&::Ea    r^rjaar:   gacJSa    aaacs    r^sr: 


2    s 


I   a 


I  a 

s   1 


II  II  {I 


^^  *  «  * 
(3  3  < 


5    3 

3     c» 


illl 

sss  I 
33^; 


6 


6  fe    ::    e 


■ — 



USUI 

TRESSBS 

122'  . 

CUEB   U-S 

h 

") 

Cd.l 

2               5 

I- 

h 

LaM*d 

5 

But 

6 

Hist 

auitr 

7 

Anne* 
&<t 

6 

Spaad 

Strcii 

9 

!fr»ot 
10 

Roll  Bffcct 
11            12 

E*»t  Olrdor  Troolc  ond 
Buaer  Blov  Brroot 

^       IV~mlo 
atroBe     r^jfiZ    kognlflor 

Rooor  Bio.  Erroot 

Dynulo 
Str...     Dbk2    Mogninor 

ATorogo  -  Both 
Trook  ood  Huner 

atr...       ti,.2 

Cirdoro 
low  Effoot 

Dyrunlo 
tognlflor 

Boot 

UAIIMn.  STBEaSBB 

Boot  Olrdor 
7ot»l  I>p..t 

Totol  In^ot 
atrooi    Cont 

X3« 

5^ 

0.57 

5.51. 

lu76 

5.06 

1..91 

0.10 

0.10 

19 



21 

1-86 

23 
5.16               0 

21. 

25 
2.1 

26 

V 

U8 

19.9 

1.5k 

5.5U 

l..e7 

5.01 

1..91. 

l:Z 

0.6 

m 

26.6 

1.99 

5.5U 

I..90 

1-99 

1-95 

0.6 

0.11  8    z'.Z  K 

o'Ifl 

2.66 

0.20 

0.20 

5.07 

5.21               0 

31 

6.5 

0.15 

3.0 

1£6 

50.1 

2.15 

3.55 

1..90 

5.06 

1-99 

0.06 

1.6 

0.06  E    1.2  s 

.08 

2.50 

2.50 

5.10 

5.19            0 

Jk 

7.1 

0.13 

2.6 

Jg 

J5.6 

U>.0 

'•52 

2.0, 

5.52 

lb  90 
1-61. 

tz 

1-90 
1-61. 

-o!27 

-0.2 
-5.5 

0.05  1     1.0  E 
0.15  B    2.6  E 

0)30      o!l2 
0.30     0.15 

2150 

0)35     0 

0.30       0 

'15 
19 

2'j3 

1.58 

0^32         0 
0.30       0 

09 
13 

17 

2:1.6 
1.77 

5.10 

5.28            0 

3k 
3k 
18 

7.1 
7.1 
5.8 

0:29 

k.3 

J:J 

W 
131 

U.7 

2.95 
2.96 

5.51 
3.55 

1-99 
U.65 

5.11. 
5.05 

tSf 

o!(^ 

I'l 

0.02  B     O.U  E 
0.05  S     1.0  E 
0.13  E    2.6  E 
0.16  B     3.5  8 
0.01  E     0.2  E 

0.50     0.15 
0.50     0.17 
0.50     0.17 
0.35     0,19 
0,70      0,20 

2.91. 
1.81. 
3.50 

0.U0     0 

0.1.5       0 

19 

2.10 

lit    i 

17 

2.63 

5.39 

5.51.            0 

63 

13.2 

0.k8 

9.5 

U9 

I£.6 

3.0E 

5.56 

1-93 

1-96 

1-96 

0.05 

?"f5 

0.1.6    0 

2.58 

5.35 

5.50            0 

59 

12  J. 

O.kk 

8.7 

12} 

211. 

Uu2 
i45.9 

3.15 
5.25 

5.52 

3.5J 

1-91. 
I..90 

1-90 
5.19 

1-92 
5.05 

0.01 
0.11, 

0I2 

HI     °o 

0.65      0 

22 

a. 

2:S 

0.1.0    0 

o.ko       0 

0.68         0 

19 
21 

1:91. 
3.01. 

5.U3 
5.29 
5.60 

5.28            0 

^:g     I 

67 
53 

8k 

lk.1 
17:6 

0.22 
0.29 
0.78 

k.5 
5.7 
15.k 

122 
121 
209 
195 
209 

52.5 
55.5 

57.5 
».3 

60.0 

5.70 
5.95 

lull 
luli 

0.9  > 

6.9  s 

l..6> 

3Je 
5.57 

5.1* 

1-76 
1-99 
1-60 
1-60 
1-77 

5.26 
5.19 
5.1s 
5.U9 
5.1.6 

5.15 
5.15 
5.12 

o;i3 

0.21, 

0.21. 
0.21 

I.I9 
1-9 
1-3 

0.10  W    2.0  W 

0.19  w   3.9  » 
0.19  »    3.9  » 
0.20  w   U.1  ir 

0,70      0,26 
0.60      0.29 
0.75     0.31 
0.60      0.31. 
0.60       0.3U 

2.70 
2.07 
2.1£ 
1.76 
1.76 

'oil  i 
0.70  0 
0.60  0 

51 

36 
38 
W 

1.2 

1:1 

1.1.6 
2.11. 

0,60       0 

0,52         0 
0,72         0 
0,60         0 
0.75        0 

29 

32 
35 

37 
38 

2.06 
1:98 

5.1.6 
5.1« 
5.55 

5.57 

5.76             0 
5.fi.             0 
6.19              0 

6:!6             0 

70 
.73 

.2 

.61 

lk.7 
15.3 

13:k 

0.70 
0.56 
1.13 
l.B 
1.30 

13.9 
11.5 
22.5 

20.k 
25.7 

196 
U9 

60.3 

a.2 

us 

Italil 

2.9  a 

6.9  » 

5.50 

1-71 
1-75 

5.59 

5.2U 

5.15 
5.00 

0.21. 
0.(S 

1-9 
1.8 

0.29  »    5.9  " 
0.09  »    i.e  » 

0.60      0.35 
0.50     0,37 

1.71 
1.35 

0.55  0 
0.70  0 

.la 

IS 

1.31 
1.56 

0.58       0 

s 

1J.9 

1.1.7 

5.51 
5.25 

5:91.             ( 

:g 

11.6 
10.3 

1.06 
0,68 

21.5 

17.k 

210 

«.5 

us 

9.7  I 

1..6a 

5.56 

1-99 

1.6 

0,21.  w    1(.9  F 

0,60      0,38 

1.56 

0,65     0 

lj6 

1.1a 

.1.2 

1.U8 

.ki. 

0.97 

19.2 

19.6 

197 

65.9 

k-H 

l..7» 

5JJ. 

1-91 

5.66 

5.21. 

0.35 

6.7 

0.26  »    5.J  » 

0.1.0      0.39 

l.<« 

o,Uo     0 

1.7 

0.96 

oilto       0 

M 

0.93 

5.21 

6:06             t 

.k5 

9.5 

m 

66.S 

lu6l. 

7.9  « 

5J.6 

1-67 

5.1a 

5.0U 

0.13 

2.6 

0.23  n    U.7  w 

0.50    o,ta 

0,50     0 

.50 

0.50       0 

.1.5 

l.U 

5.17 

6.01              0 

M 

6.6 

0:95 

uo 

67.0 

!..75 

6.6  1 

5.52 

1-70 

5.56 

5.0U 

0.15 

2.6 

0.20  w    U.1  w 

o.to    0,13 

0.93 

0.I4O      0 

.52 

0.77 

O.I4O          0 

J.8 

o.au 

5,10 

5.78              0 

.3k 

7.1 

0.72 

lk.2 

190 

67.7 

14.90 

9.6  1 

3.K 

1-71 

5.1.5 

5.06 

0.17 

5.5 

0.21  W    1-3  ■ 

0,50      o.ljl. 

1.11. 

0.U5     0 

53 

0.85 

o.UB       0 

1.8 

0.98 

5,21 

5.90             0 

•  k5 

9.5 

o.ek 

16.6 

212 

69  Jt 

U.95 

3.7  B 

3J.7 

1-61 

5.1.6 

5.0U 

0.13 

2.6 

0.28  »    5.7  » 

0.50     0,U5 

1.11 

0.55      0 

.51. 

0.52        0 

50 

1.06 

5,11 

.35 

7.k 

i-i 

199 

«.o 

lu99 

7.9  8 

3.te 

1-66 

5.55 

5.21 

0.30 

6.1 

0.19  w    3.9  » 

0.50     0,1.5 

1.11 

0.55      0 

.55 

lioo 

0.52        0 

50 

l.ol. 

5.56 

6:10           0 

.60 

12.6 

20:* 

213 

70.6 

5.00 

3.1.9 

1-69 

5.37 

5.M 

0.12 

2.U 

0.19  »    5.9  " 

0.1.0       0.1.8 

0.65 

0.50     0 

58 

0.86 

0.1.5      0 

52 

0.86 

5.08 

5.87              0 

.32 

6.7 

16.0 

US 

71.0 

5.l>> 

l.>M 

l-S 

1-52 

5.51 

5.02 

0.11 

2.2 

0.35  w    7.1  w 

O.W      0.1.8 

0.91. 

0.50     0 

58 

0.86 

O.U       0 

53 

O.W 

I1.97 

6.01              0 

.21 

k.k 

0.95 

18.6 

200 

72.1 

5.12 

2.6  t 

1-70 

5.« 

5.17 

0.26 

5.3 

0.31  w    6.5  11 

0.50      0.50 

0,50     0 

0.83 

0.50       0 

55 

0.91 

5.20 

6:i3              0 

:kk 

9.2 

1.07 

117 

76.5 

5J4O 

U.1S 

3J.7 

1-60 

5.W 

5.01. 

0.13 

0.30  w    6.1  » 

0.55     0.55 

0,55      0 

67 

0.55       0 

61 

5.15 

6.03              0 

.39 

19:2 

201 

77.5 

5.1« 

2.5  1 

3J.5 

1-75 

5.76 

5.25 

0.31. 

6^9 

0.36  w    7.3  • 

0.55      0.57 

0.96 

04.0       0 

« 

o!58 

o.W       0 

65 

0:75 

5.26 

6.16             0 

.52 

10:9 

1:10 

21.7 

202 

79  J. 

5.61. 

7.1  I 

}J6 

1-61 

5.6U 

5.35 

Oj£ 

8.5 

0.35  »    7.1  » 

0.55     0.60 

0.92 

0.50      0 

73 

0,66 

0.52          0 

67 

0.79 

5.36 

6.31.            0 

.60 

1.28 

25.5 

lli 

90.9 

5.73 

6.U> 

3.1.5 

1-7U 

5.1.8 

5.U 

C95 

0.20 

I..1 

o.a  w    I..5  IT 

0.60     0.62 

0.97 

0.60       0 

76 

0.79 

0.60         0 

69 

0.87 

5.31. 

6.06                 0 

.58 

12.2 

1.02 

20.2 

as 

92.2 

5. 63 

9.9  I 

3.1.9 

l-« 

5.27 

o.ol, 

0.17  "    3.5  w 

0.65     0.65 

0.70      0 

78 

0.90 

72 

0.91. 

5.28 

5.97            0 

.52 

10.9 

0.91 

U3 

9luO 

5.95 

3.37 

5.15 

5.69 

5J.2 

0.51 

loll. 

0.90     0.67 

K51. 

0.75      c 

81 

0.93 

71. 

6.05 

6M             1 

.29 

27.1 

1.36 

27.3 

20l> 

95.0 

6,0} 

5)6  » 

5.1.5 

1..91 

5.55 

5.18 

0.27 

5.5 

oijl  1.    U5  ■ 

0.70     o.« 

ak 

0.95 

0.75        0 

76 

0.98 

5.51 

6:51        1 

.75 

15.8 

1.29 

25.5 

m 

95.0 

6.0} 

1-5  • 

5.57 

5.35 

5.65 

5.50 

0.9) 

0.90      0.69 

1.30 

0I95     0 

81. 

1.13 

0.92         0 

76 

1.21 

6.20 

.U. 

50.2 

i.ka 

29.2 

U5 

67.0 

6.17 

1.9  S 

3.39 

5.09 

It 

5.1a 

0.50 

10.2 

0.15  »    J.l  w 

0.90      0.72 

1.25 

0.85      0 

88 

0.97 

0.68        0 

80 

1.09 

5.99 

6.56              1 

•^? 

25.8 

1.52 

30.0 

207 

69.0 

6.21. 

0.6  9 

5.ie 

E:J? 

5.27 

0.56 

7.3 

o.oe  »   0.1. » 

0.80      0.7I. 

0.85       0 

90 

0.9U 

5.90 

6.29              1 

.Ik 

21-0 

1.25 

21-5 

206 

60.3 

6.26 

7.7  I 

iM 

5*1.0 

5.15 

0.22 

1-5 

0.12  »    2.1.  w 

0.60      0.71. 

0.65      0 

90 

0.72 

0.62         0 

83 

0.76 

5.U5 

6.05             0 

.69 

lk.5 

0.99 

19.6 

205 

mA 

6.5U 

1.9  1 

5.W 

1-77 

5.76 

5.27 

0.J6- 

7.3 

0.53  »   6.7  w 

0,80      0.76 

1.05 

0.70      0 

92 

0.76 

0.75         0 

81. 

0.69 

5.57 

6.1.6              0 

.81 

17.0 

l.ko 

27.6 

•on.    ( 

.1    Ul  .t 

, t, 

»«,  1«  00 

l>an<   6. 

7.   1), 

16,   £2.   .nd  25  u- 

.  etJcu,  nm  TUI.  9    ud  u.  th.  .nn 

[TT 

tho  top  «ad 

bottOB  rUngo  itro 

•   for  oooh  glrdor. 

( 

bl  111  .t 

( 

t)       DlMlU 

a  ■!■  1 

.1  .ol.nn 

i,  !•   th. 

dl.t.n<. 

•,   .Ithw  north  0 

•  •"*"•  "' 

tho  opMi  to 

tho 

"■"■  "''"'■ 

»t  tho  tlM  u 

tio  plM  aro  In  pool 

tlon 

»  bMd*d  iMth. 


TABLE  18 
>•  BTRAIB   CA( 


122'  . 

■  oiROEB  en 

Jt 

-^^ 

STRKfiSES 

,- 



LOCOllOTIVE 

UBl  B-A  (BTEU) 

St~4 

«-..>. 

tbMratloftl 

But 

Ittit 

ud 

SpMil  BfHot 

Boll  Bff«ot 

EMt   01rd«r  Tr«ok  uid 
Hm„r  Blm  Bff.M 

Boa-i 

:,Yrtr 

ATanigo  -  Both 
Traek  and  HuB«r 

Oirdor. 

lUXlWH  STRB8SB 

w.it  01rd.r 

Col.X 

a.F.B 

s.r.s. 
5 

It 

5 

OirdM- 
6 

7 

Hist 

Btr»9* 
9 

Cant 
10 

Strsii       c«at 

strM. 

iiHie 

l}ynule 

ii.oan.r 

Str...       I^te 

Dynudo 

ItagplflT 

^t 
Unlor 

1";;:, 

fitraoa     Cent 

,:«i  i^'ot 

Str...     c«* 

13) 

I* 

9.0 

0.58 
0.71 

3.22 

5.21 

6.ce 

6.14 

5.85 
6.18 

5.91. 
6.16 

5.7 

0.10  F    1.7  w 

15 

0,10 
0,12 

0.50 

0.)2 
0.1.2 

11. 

15 

16          17            16 
0,05 

19 
O.ol, 

20 

6.0I, 

25 

5.90 

21, 

25 
0.3 

26 

0.05 

27 

135 

137 

13.3 

25.0 

1.05 
1.98 

3.21 
5.17 

6.2U 
6.51 

6.30 
6.1.6 

6.27 
6JJ 

0.51. 

5.6 
9.1 

o!o6  n    l!o  lr 

0,03 
0,w 
0.10 
0,13 

1-00 

3.19 

3.57 
3.26 

0,05 
0,25        0 

.03      8.33 

0.06 
0.19        0 

03 

6.33 

6.2], 

6.56 

6!56 

o'.a 

5.6 

5.6 

0.39 
0.71 

6.7 
12.1 

150 
US 

25.2 

29  J. 

1.99 
2.52 

).21 
3.21 

6.11. 
6.22 

6.20 

6.31. 

6.17 
6.26 

0.23 

o.)l. 

3.9 
5.7 

0.11  »    1.8  w 
O.IJ.  »    2J.  1. 

0.30       0 
0.15       0 
0.25       0 

■,10     1)50 

.11.      1.79 

0.30       0 

0.2U         0 

0.31.       0 

11, 

5.00 

2.1,0 
2.52 

6.61. 

6.76 
6.36 
6.59 

0.78 

O.IJ, 

15.0 
7.5 
10.3 

0.91 
0.51 
0.71, 

15.6 
8.7 
12.6 

Its 
IW 

2.75 
3.18 

5.22 

3.20 

6.18 
6.36 

6.1.6 
6.36 

6.52 
6.36 

0.58 
0.1.2 

6.1. 
7.1 

i"l:  ii; 

0.69 
0.69 
0.59 

0.31. 
0.5U 

0:21. 

3.79 

0.52         0 
0.61.         0 

0.51.       0 
0.30      0 
o,u.      0 

.20      2.61, 
.26      2.1,6 

0.60         0 

19 

3.16 

6.68 

6.97 

0.66 

11-5 

1.12 

19.1 

155 

U.5 

3.28 

3.21 

6.22 

6.16 

6.20 

0.26 

L*k 

2.'27 
1.31 
1.66 

.25 

2.61 

7.05 

7.00 

1.03 

1.15 

19.7 

195 

U.o 

3.52 

3.15 

6.13 

6.28 

6.20 

0.26 

I..1. 

0.05  V    0.8  w 

0^26 
0,29 

.28       1.93 

0.56       0 

27 

2,07 

6,82 

6.72 

15.5 

0.87 

11-9 

IB 

13.9 

)Ji7 

3.1U 

6.21. 

6.06 

6.15 

0.21 

3.5 

0.01  >     0.2  B 

Isi       Ul£ 

0.52        0 
0.1«         0 

28 

30 

1,06 

6.1.8 
6.78 

6.58 
6.50 

o!li 
0.76 

7.6 
12.6 

0.73 
0.65 

12.5 

15t 

167 
IM 
152 

1^.2 
1*.5 
U7.0 
M.o 
W.2 

3.66 
3.« 
3.71 
3.71 
3.72 

3.2U 
3.1J. 
3.1i. 
3.22 
3.2) 

6.26 
6.22 
6.20 
6.20 

6.11. 

6.16 
6.52 
6.21. 
6.50 
6.38 

6.21 
6.27 
6.22 
6.25 
6.26 

0.?7 
0.55 

o!31 
0.32 

1..5 
5.6 
1-7 
5.2 
5.1. 

0.03  W    0.5  « 
0.11  W     1.8  11 
O.IO  W     1.7  » 
0.15  I!     2.2  » 
0.20  «     5,1.  W 

0.J9 
0.51. 
0.1.9 
O.S 
0.59 

0,32 
0,32 
0,33 
0,33 
0.3J 

1.22 

1.69 
1.1.B 
1.79 
1.79 

o,lA      0 
o.le       0 
0,U9        0 
0.71.      0 

0,61.        0 

.35      1.26 

55  1.1,0 
36      1.56 

56  2,06 
.36      1.76 

0.1,2         0 
0.52        0 

o.ie      0 

0.66         0 

o.£e      0 

33 

31, 
35 
55 
55 

1,26 
1,5U 
1,1£ 
1.91 
1.79 

6.61. 
6.76 

6172 

6.60 
6,80 
6.71, 
7.01, 
7.02 

o!7U 
o;76 

10.3 
12.3 

13  .'0 
11.6 

0.75 
0.95 
0.99 
1.19 
1.17 

16^2 
15.2 
20.3 

151 

WJ. 

).7U 

3.22 

6.l£ 

6.50 

6.1* 

0.52 

6.8 

0,13  «    2,2  r 

o.a 

0.31. 

1.88 

0,62         0 

.56      1.72 

0.65       0 

35 
36 
39 
W 
1,5- 

1  80 

7  06 

17.3 

1,26 
1,51 
0.73 

l"39 

191 
I9e 

190 

ia.5 

50.2 

51  Ji 

3.91 

).96 
lu06 
t.25 

7.7  B 
5.6  1 

3.15 
3.20 
3.10 
5.20 

5.96 
6.1.2 
6.33 
6.21 

6.1.7 
6.26 
6.56 
6.56 

6.22 

6.3!* 
6.31. 
6.38 

0.26 
0.1.0 
O.to 
O.IJ. 

1..7 
6.7 
6.7 
7.1. 

0,51.  »    5,7  » 
0.01  w    0.2  » 
0,09  K    1,5  1" 
0,25  »    1-2  » 

0.72 
0.36 
0.52 

0,51. 

0,J7 
0,38 
0,1.0 

0.1.3 

1.95 
0.95 
1.30 
1.26 

o,e      0 

0,!2         0 

o,ie      0 

0,69        0 

1,0      1.72 
Ul      0.76 
U5       I.ll, 
1.7       1,1.7 

0:51,       0 

0.50         0 
0.62        0 

i!e5 

0.67 
li37 

6l67 
6.78 
6.65 
6.75 

7!l6 
6.58 
6.65 

7.21, 

o!« 

0,76 
0.65 
0.73 

22iu 
12.5 
17.1 
23.6 

IW 

51-) 

1-29 

3.2  » 

5.15 

6.59 

6.1.1. 

t.i£ 

O.I.B 

e.i 

0,12  »    2,0  11 

0.15 

o.kk 

0.31. 

0.59       0 

1.8       0,61 

0.27        0 

1,6 

0.59 

6.51. 

6.63 

0.52 

6.6 

0  98 

16  7 

i!a 

57.0 

L.50 

0.5  » 

5.15 

6.10 

6.1.2 

6.26 

0.32 

5.1. 

o!2l,  W    Co  11 

O.IA 

o.lfi 

0.90 

0.52       0 

53       0.96 

0.1,8         0 

51 

0,95 

6.51. 

6:9U 

0.52 

8.6 

1.09 

ie!6 

11,0 

56.5 

1-62 

3.5  8 

S.llt 

6.1.3 

6.36 

6.1.0 

0.1.6 

7.7 

0.06  w    1,0  » 

0.37 

0,51 

0.72 

0.1,0         0 

55      0.73 

0.38       0 

53 

0,71 

6.80 

6.76 

0.7a 

15.0 

0.91 

15.6 

185 

60.0 

U71i 

5.06 

6.21. 

6.88 

6.56 

10.1. 

O.ltfi  w    6.7  W 

0.1fi 

0,51. 

0.91 

0.59        0 

56       1.02 

0.5U       0 

56 

0,96 

6.75 

7.1,7 

0.71 

1.62 

27.7 

186 

62.8 

1-96 

9.0  s 

5.15 

6.18 

6.20 

6.19 

0.25 

1-2 

o.»  w    1.5  » 

o.l« 

0.59 

0.83 

0.52       0 

61,      0.81 

0.50       0 

0.81 

6.67 

0.65 

lo!6 

0.67 

11-9 

lUt 

61_s 

5.12 

5.7  • 

5.22 

5.96 

6.55 

6,21. 

0.30 

5.0 

0.36  w    6.1  w 

O.U. 

0.63 

0.70 

0.52       0 

68      0.76 

0.1,6         0 

66 

0,75 

6.1,0 

7.01, 

0.38 

6.3 

1.19 

20.3 

139 

66.5 

5.25 

7.0  s 

5.17 

5.95 

6.21. 

6.10 

0.16 

2.7 

0.23  w    5.9  • 

0,37 

0.56 

0,1.2        0 

72      0.58 

0.1,0          0 

w 

0,56 

6.52 

6.66 

0.50 

5.0 

0.61 

13.6 

lak 

67.7 

5.3I» 

1.2  I 

3.10 

6.19 

6.19 

6.19 

0.25 

1-2 

0.08  »    1.3  w 

0,5U 

0.66 

0.79 

0.61.        0 

71,      0,86 

0.99        0 

0,83 

6.73 

6.65 

0.71 

0.96 

16.7 

182 

68.1 

5.59 

9.2  S 

3.11. 

5.92 

6.58 

6.25 

0.31 

5.2 

o.la  »    6.9  w 

o.Ui 

0.69 

0.61. 

0.56        0 

75       0,75 

0.50       0 

75 

0.0) 

6.36 

7.15 

0,31, 

5I6 

1.30 

189 

69.9 

5.52 

lj.2  I 

5.10 

6.02 

7J.a 

6.71 

0.77 

IJ.O 

0.T7  »  IJ.O  » 

0,1J. 

0.73 

0.60 

0.31.       0 

79       0.1,5 

0.59        0 

76 

0,51 

6.1,6 

7.71, 

0,1J, 

7.5 

1.89 

32l3 

138 

71.2 

5.<e 

3.9  » 

3.17 

5.67 

6.75 

6.21 

0.27 

1-5 

0.62  F  10.1.  F 

0.51. 

0.76 

0.71 

0,1.9        0 

82      0.60 

0.52         0 

79 

0,66 

6.21 

7.21, 

0,19 

3.2 

1.39 

25.6 

181 

72.6 

5.75 

1-1  I 

3.12 

6.10 

7.08 

6.59 

0.65 

10.9 

0.57  11    9.6  w 

0,61, 

0,79 

0.81 

0,50         0 

66      0.35 

0.1,7        0 

63 

0.57 

6.71, 

7.56 

0,72 

1.53 

180 

75.7 

5.98 

1.1  a 

5.12 

6.22 

7.06 

6.61. 

0.70 

U.8 

0.1.5  11    8.1  w 

o.al. 

0.97 

0.59        0 

93       0.63 

90 

7.06 

7.61, 

l.ol. 

17^3 

1.79 

50^6 

US 

T7.9 

6.15 

8.6  > 

3.17 

6.0L 

6.U> 

6.22 

0.28 

U.7 

0.26  w    U.I.  w 

0,62 

0,91 

0,66 

0.69         0 

98      0.70 

0.(6          0 

95 

0)70 

6.66 

7.09 

0.61, 

10.6 

1.21, 

Impact 447 

discrepancy  may  be  the  lateral  forces.  Assuming  that  these  lateral  forces  are  resisted  by 
the  span  acting  as  a  horizontal  truss,  tensile  stresses  will  be  produced  in  both  flanges  of 
one  girder  resulting  in  a  decrease  in  the  vertical  compressive  stress  of  the  top  flange  and 
an  increase  in  the  vertical  tensile  stress  of  the  lower  flange,  whereas  the  reverse  would  be 
true  in  the  other  girder.  By  using  the  average  of  the  top  and  bottom  flange  stresses,  this 
lateral  effect  can  also  be  eliminated  to  a  large  extent. 

The  stresses  in  the  west  girder  of  both  spans  are  usually  found  to  be  larger  than  in 
the  east  girder.  A  part  of  this  increase  is  due  to  eccentric  application  of  the  load  in  this 
direction  as  has  been  pointed  out.  The  remainder  can  only  be  ascribed  to  the  rolling  of 
the  locomotive  which  was,  for  some  reason,  usually  to  the  west.  In  a  few  instances  the 
average  stress  in  the  east  girder  is  the  larger,  indicating  that  the  roll  in  that  direction  was 
more  than  enough  to  counteract  the  eccentricity  in  the  opposite  direction. 

The  basic  tables  of  stress  and  deflection  tabulation  (Tables  3  to  10,  inclusive)  have 
been  broken  down  to  show  more  clearly  the  various  impact  effects  which  will  be  con- 
sidered later.  Tables  11  to  18,  inclusive,  refer  to  stresses  in  both  girders  of  either  span, 
for  the  four  classes  of  locomotives.  Tables  23  to  26  deal  with  deflections  as  measured  in 
the  east  girder  of  the  S5-ft.  10-in.  span  and  Tables  27  to  30  give  the  deflections  as 
measured  in  both  girders  of  the  122-ft.  span. 

At  the  bottom  of  these  tables  will  be  found  the  stress  and  deflection  factors,  which 
are  the  ratio  of  the  measured  stress  or  deflection  at  crawl  speed,  to  the  theoretical  values. 
The  theoretical  values  were  computed,  as  previously  mentioned,  from  the  gross  moment 
of  inertia  at  the  center  of  the  span,  assuming  a  constant  section  throughout,  and  using 
the  average  of  the  left  and  right  wheel  loads. 

These  stress  or  deflection  factors,  as  might  be  expected,  are  not  unity  and  vary  with 
each  of  the  locomotives  even  on  the  same  span.  They  may  be  affected  by  either  the 
change  in  span  length  under  load  when  the  girders  have  flat  bearings  as  in  the  case 
of  the  short  span,  or  by  the  change  in  actual  axle  loads.  The  axle  loads  used  in  the  com- 
putations are  the  scale  weights  obtained  when  the  wheels  were  all  at  the  same  elevation, 
but  as  the  span  deflects  under  load,  the  center  wheels  have  a  tendency  to  drop  and  the 
equalizing  system  transfers  a  portion  of  their  load  to  the  end  axles. 

The  measured  deflections  should  obviously  exceed  the  theoretical  values  as  they 
include  any  settlement  of  bearings  or  shortening  of  the  piers  under  compression  and  the 
girders  are  not  of  uniform  section  throughout  their  length  as  assumed  in  computing  the 
theoretical  values.  The  deflection  factors  as  found  for  these  two  spans  agree  closely 
with  the  average  found  for  all  similar  girders  formerly  tested  and  reported  in  the 
AREA  Proceedings  for  1936,  Vol.  37,  page  794. 

The  theoretical  loaded  frequencies  for  the  122-ft.  span  are  based  on  the  average 
deflection  in  the  east  and  west  girders  as  measured  by  the  electrical  and  mechanical 
deflectometer.  These  frequencies,  for  all  runs  of  the  two  steam  locomotives,  are  shown  in 
column  5  of  Tables  17  and  18.  The  frequencies  of  this  span  for  the  two  electric  loco- 
motives, under  static  loading,  are  given  in  note  "d"  at  the  bottom  of  Tables  IS  and  16. 

As  previously  pointed  out,  both  deflection  instruments  were  on  the  east  girder  of 
the  SS-ft.  10-in.  span  so  that  in  computing  the  loaded  frequencies  for  this  span,  it  was 
necessary  to  correct  the  measured  deflections  by  the  roll  percentages  as  found  by  the 
strain  gages.  These  corrected  deflections  and  the  theoretical  loaded  frequencies  for  all 
runs  of  the  two  steam  locomotives  are  shown  in  columns  5  and  6  of  Tables  13  and  14. 
The  frequencies  for  the  two  electric  locomotives,  under  static  loading,  are  given  in 
note  "d"  at  the  bottom  of  Tables  11  and  12. 


448 Impact 

9.  Impact  Effects  as  Found  From  the  Test  Data 

The  data,  as  taken  from  the  field  records  and  summarized  in  Tables  3  to  10,  inclu- 
sive, were  analyzed  for  the  particular  purpose  of  segregating  and  determining  the  mag- 
nitude of  the  various  dynamic  or  impact  effects  of  the  moving  loads.  The  results  of 
this  study  are  as  follows: 

Speed  Effect 

In  taking  off  and  recording  the  mean  stresses  and  deflections,  it  soon  became  evident 
that  the  mean  stress  or  deflection  increased  with  speed.  In  column  5  of  Table  11  the 
average  mean  stress,  for  the  first  three  runs,  which  were  at  crawl  speed,  is  7.57  kips  per 
sq.  in.  An  increase  in  speed  is  seemingly  accompanied  by  an  increase  in  mean  stress  and 
for  run  248  at  99.5  m.p.h.,  the  average  mean  stress  has  increased  from  7.57  to  9.07  kips 
per  sq.  in.,  or  an  increase  of  19.8  percent  as  shown  in  Col.  7.  A  corresponding  increase, 
although  to  a  lesser  degree  on  the  long  span,  is  found  for  the  other  locomotives  as  will 
be  seen  from  Tables  12  to  18,  inclusive. 

This  increase  can  be  partly  accounted  for  by  the  centrifugal  force,  resulting  from 
the  load  running  over  the  deflected  span.  This  force  increases  with  the  square  of  the 
speed,  and  may  be  approximately   expressed  by  the  equation: 


F  =  P 


(    g^^    ^ 

V  16  v^'d  ) 


in  which: 

F  =:  Centrifugal  force  in  pounds 

P  =  The   moving  concentrated   force   producing   the   same  central   deflection   as 

the  distributed  static  wheel  loads  in  pounds 
V  =■  Velocity  in  feet  per  second 
d  =  Static  deflection  of  the  span  in  feet 
L  =  Length  of  span  in  feet 
g  =  Acceleration  due  to  gravity  (32.2  ft.  per  sec.  per  sec.) 

The  measured  speed  effects,  in  percent  of  the  crawl  stress,  as  given  in  the  tables, 
have  been  plotted  for  all  four  locomotives  on  both  spans  in  the  upper  diagrams  of 
figures  28  to  35,  inclusive.  For  comparison,  the  theoretical  values  as  determined  from  the 
above  equation  are  represented  by  the  smooth  curve.  It  will  be  seen  that  except  for  the 
Class  P5-A  electric  locomotive,  the  agreement  between  the  actual  and  theoretical  values 
is  not  close,  the  former  frequently  exceeding  the  latter.  On  the  122-ft.  span  the  dis- 
crepancy is  more  marked.  While  the  measured  effects  are  not  as  large  as  in  the  short 
span,  nearly  all  of  them  are  greater  than  the  theoretical  values. 

As  a  further  study  of  this  interesting  phenomena,  the  theoretical  influence  stress 
curves  were  computed  for  the  two  electrical  locomotives  on  both  spans,  these  curves 
representing  the  stress  at  the  center  for  any  position  of  the  locomotive.  The  ordinates 
of  the  actual  average  stress  curves  were  scaled  from  several  records  at  intervals  of  20  ft. 
for  the  long  span  and  10  ft.  for  the  short  span,  and  are  given  in  Tables  19  to  22, 
inclusive. 

The  area  of  these  stress  curves,  which  may  be  represented  by  the  sum  of  the  ordi- 
nates, is  a  measure  of  the  total  work  done,  and  here  again,  it  will  be  noted  that  the  sum 
or  area  increased  with  speed.  For  test  248  with  the  PS-A  locomotive  running  at  99.5 
m.p.h.  over  the  5S-ft.  10-in.  span  (see  Table  19),  the  average  sum  of  the  scaled  ordinates 
is  44.55.  The  sum   of  the  ordinates  of  the  theoretical  stress  curve,  for  this  locomotive 

(Text  continued  on  poiir  457 ) 


Impact 


449 


5S 


vO      nO  ^  -o      nO  r-  r— 


o  o  o      Q  o  ir\     lAir. 
ooo      ooo    ,00 


p 

g 

d  00 

000 

^8 

3 

S; 

333 

Cs>0  0 

°5 

*? 

0 

833 

S8S 

SS 

€ 

0 

000 

000 

0  0 

^. 

0 

000 

lAso  CO 

ss 

^ 

0 

8Sg 

000 

0  0 

>- 

r- 

mcor- 

0  OS 

0 

3 

000 

8Sg. 

RS 

CD 

r- 

oor-» 

(DCT^CT- 

0  CD 

? 

r- 

8Sg 

8S3 

S8 

43     3-sooD      o^os 


3« 


^Q        to  O  K\       »o»_^ 
^o       ir\0  o      00 


450 


Impact 


4S 


5S 


si 


s 

o 

gss 

g^S 

S!!R3 

r- 

C; 

KR3 

^53 

333 

" 

8 

o 

^  UMT* 
•H   iH   .-1 

^^g 

SS!R 

JS 

o 

^ 

ITiO  O 

jiA  j 

w 

o 

s? 

«•!?« 

«8tf^ 

3&g 

^ 

u^ 

u^ 

l;^^OvO 

ITN-OsO 

•O  vO-O 

■a       Vi 

O 

° 

SSa 

s«s 

2SS 

^O 

so 

-o-o-o 

■o-o  t~ 

r-t-r- 

K 

o 

ss^ 

oi/\o 

8S!f; 

m 

-o 

o 

-o-o-o 

o-o  t~ 

t^r-t- 

5)    "^ 

o 

t? 

«!R« 

R?,!0 

o  o  q 

£ 

■o 

vO 

vO-OvO 

sO-O-O 

sO-O  t~ 

-4         o 

o 

-i 

S»8 

^  Cii-O 

Q  ir,iA 

Xt 

s 

s 

s&s 

i^i 

•fvl 

• 

tf 

8 

s 

©  r-uS 

?,sg 

g&8 

t> 

1-4 

<5 

ooo 

ooo 

O  O  <H 

1° 

H    0) 

rH 

t-4 

og  o 

ooo 

Sg8 

. 

•O 

» 

s 

ooo 

8g8 

g,s^ 

^ 

•-' 

'^ 

rt  rt  w 

rt  rt  OJ 

w  W  -1 

4* 

£ 

'Ss 

s 

ooo 

ooo 

lA  j  j 

jiA  j 

«. 

W> 

s 

o 

ooo 

ooo 
CJ  IT.-:! 

8?,g 

a 

"^ 

"^ 

OsO^ 

.0,0  r- 

t— oc~ 

e| 

: 

-o 

o 

■a 

ooo 

OstD  <M 

vOso  r^ 

r-r-<D 

Sg2 

f^ 

s    • 

« 

g 

o  o  o 

S3S 

gS3 

3-g 

^ 

vO 

<l 

^so  r- 

r-t-iD 

.0  t-<E 

o  3 

Cm 

- 

mJ 

■3 

S8g 

°.°A 

•     ID 

a 

^ 

d 

^0 

2 

d 

^S8 

ggg 

gg8 

St 

° 

l-t 

° 

ooo 

ooo 

O  O  pH 

h 

t-  d 

^ 

M3 

o 

^3S 

^^^ 

&gg 

.11 

535 

^ 

s; 

8 

23S 

S5S 

s^s 

o 

^ 

«-.« 

Or^rH 

-.w« 

« 

^ 

^ 

J 

o 

r-l 

8 

SSg 

OOO 
OOO 

g3S 

vOMJ-O 

5Sl 

» 

8 

8SS 

O  O  Q 

8S3 

lii 

e  a  n 
Q   •   • 

•   e   • 

333 

ir> 

•o 

>oo  ir\ 

sO^O^O 

r-r-o 

[2     o 

o 

o 

~o 

8 

ooo 

,0x0-0 

8gg 

OOO 
Oi  rH  8 

88g 

8S8 

" 

se 

s 
-} 

ooo 

lAj  J 

^ 

^ 

S 

S^g 

ooo 

ooo 

d  ^  o 

^ 

s; 

S 

g&3 

g.sO  c^ 

gg8 

^ 

o 

° 

ooo 

ooo 

O  O  r4 

S 

1 4 

at 

-» 

<DOt- 

•-KD^ 

'l-^'i 

h 

3 

J 

<^i?» 

SR« 

•agg 

u 

%' 

1 

^ 

H5 

aE^ 

H£ 

Impact 


451 


"I 

ii 


a  a, 
5  i; 


pa 


3^ 

r- 

jrj 

SS» 

a2s; 

iffRSIO 

o 

:S 

S2I; 

r— CO  >0 

rH   rH   rH 

«i:ss 

^ 

s 

(T- 

^?« 

t-r-r- 

P2»8 

o 

O 

o  o  o 

o  o  o 

o  o  o  .-. 

■XJ          ^ 

5 

8 

"2 

S8S 

o  ino 

^'^'?'9 

£        • 

r- 

s 

irtir>o 

cS 

«^ 

KS 

K^K^_:J 

jj~^ 

J-3  J  J 

£)     "^ 

3 

3 

S,!R3 

UNO  O 

RfiSiS 

£ 

J 

^ 

J  jj 

J-3  J 

jjj  J 

S 

o 

s;r!r 

UNO  ir> 
iiNr->o 

;ft!&SS 

- 

» 

S 

£3^ 

§g^ 

^^^^ 

• 

^ 

s 

O  lAlTv 

UMAlTi 
UN-OJ 

IR33^ 

" 

° 

° 

o  o  o 

o  o  o 

o  o  o  o 

5s 

rH 

8 

o  o  o 

Of- IT. 
«H  .-1  •-« 

CD  OD  C- 

8&S 

rH  rH  rH 
O   O    O 

3PiS^ 

4>      • 

11 

4> 

O 

o 

sss 

3S?. 

o  O  O  « 

2S!38 

• 
• 

»        9 

■o 

■P        -0 

o 

822 

J  J  J 

S8g 

-3  J  "N 

o  o  o  o 

o  o  o  o 

•  i 

!• 

it 

a 

Vi 

o 

a 
• 

^. 

s 

ii 

J  J-3 
888 

JUNl/MiN 

gsss 

£8gg 

d 

3 

<-t 

rH  rH  (-1 

www 

^3  3 

o  o  o 

^£3^ 

^  d 

S 

o 

g2S 

8?S 

23&gl 

5S5 

•o 

-0* 

;3 

^S2 

SSI5 

rH  rH  rH  rH 

k 

U) 

Si 

g 

SSS 

^&S 

&3gg 

o 

o 

o  o  o 

o  o  o 

oooo 

<H 

5: 

8 

8SS 

o  o  o 

S3S& 

S  i  < 

%   . 

o 

www 

o  o  o 

w  w  w  w 
oooo 

III 

O 

3 

o 

o  o  o 

j  J  j 
82^ 

Q  O  O 

oooo 

J~^«NJ 

B      B      ■ 

nan 
U    U    1. 

M    ■    • 

aa3 

" 

^. 

s 

S^S 

SS3 

s^sg 

522 

d 

Ji 

3 

?,3R 

S&?, 

333?, 

s 

° 

O 

o  o  o 

o  o  o 

oooo 

^  EC 

: 

r^ 

<D  ^^ 

rtUNUN 

Jir\<ot- 

1°: 

% 

-3 

S«3 

s^ffiS 

sses; 

li 

1 

g 

W  W  rf 

|8g 

^^m 

452 


Impact 


tag 


Eh     ri 

3 

^ 

S,>3S- 

^^  r- 

a 

(^ 

sss 

S2S 

88  8 

U/ 

s 

s 

282 

22,© 

282 

T)          t-. 

so 

I 

(-1  i-<  «H 

io  t-CO 

gps 

5     . 

g 

° 

°wc? 

1?;;^° 

SSR 

J 

-3 

J  J  J 

J  jj 

J  jj 

•       -o 

r- 

S 

o  o  in 

t^  r-  ON 

&S8 

J 

J 

jjj 

jj-^ 

J  jiA 

-<        o 

8 

iff^S 

j  J  J 

fi 

^ 

» 

o  o  o 

iH  iH  rr\ 

O  UNO 

Sin^ 

• 

« 

8*. 

s 

g  jCg 

m  S  ° 

gese 

■■ 

° 

° 

OOO 

OOO 

OOO 

" 

■So 

t- 

8 

8Sg 

§83 

g  2  ° 

• 

H    « 

2 

S 

888 

Sc3J3 

SSiS 

• 

" 

ff. 

s 

8  °  8 

8S2 

8  88 

i-t  t-t  t-i 

w 

<-. 

S 

o 

§2  8 

S&g 

ggs 

I 

w 

° 

SS3 

SR^ 

g2g 

^ 

•^ 

jjj 

jjj 

-3  1AJ 

t-. 

V       -o 

J 

o 

c-(r>  o 

^s^ 

° 

~. 

o 

iAm^  j 

22S, 

OOO 

J  J  J 

u 

^ 

s 

s 

H^A 

lAJ^ 

SS8 

« 

s 

g 

ggg 

g§8 

OOO 

° 

° 

OOO 

OOrH 

OOO 

a 

•a 

15 

OOO 

CD  a?  (> 
rH  rH  iH 

r-<   f-l  >H 

8  23 

° 

« 

o 

^ 

82  8 

88  8 

8  8  8 

r^  r^  >~t 

«-t 

O 

ss  s 

o  o  o 

f-f-^ 

•                     • 

^ 

s 

823 

OOO 

OOO 

® 

o 

J 

333 

333 

^ 

73 

s 

sss 

^2  8 

H^r<N  j 

%°.°. 

- 

a 

r-* 

888 

2^8 

rt  cJcC 

« 

s 

s 

s  °  s 

ss  s 

ggg 

° 

° 

OOO 

OOO 

OOO 

13  X 

• 

J 

sO  t~<E 

rtlDsO 

in  JO 

w  a 

1 

J 

J^S  R 

R»P 

P^c^o 

t£  z 

• 

6 

»-4 

r-l   iH   (H 

t-4  r-4  rH 

S§S- 

t    B 


S5 


Impact 


453 


*>           ■*» 

'    is 
It 

31 

s 

SljSjd 

'^6  6'^'^ 

13.9 
10.1 

8.7 
15.U 

7.6 

^pdS 

-17.7 
-16.7 
-18.8 
-15.5 

5        ^- 

• 

s 

SfS" 

§§^§§ 

sills 

ItSsl- 

f«§i& 

M&§f 

fell§^8 

odd 

d  o  d  d  d 

d  d  d  d  d 

d  d  d  d  d 

d  d  d  d  d 

d  d  d  d  d 

d  d  d  d  d  d 

1* 

s 

lf\0  t^ 

Blls 

33333 

■lAuSmlAlA 

rrSss 

0  0  I/MAO 

KN-JJ  ir\  UMA 

ooo 

6  6  6  6  6 

d  d  d  d  d 

d  d  d  d  0  d 

5 

8. 

lAO-J 

irsj-»>o  J 

NO  UMAUMA 

r--r-i--  r^NO 

sOnOWVUSIO 

O^O  0  iH  0 

0<OnO-»  .<id 

S 

s 

" 

' 

H^rH  d  (D  d 

a5««.^so" 

S!:Ji~2 

o-'ajjoj-^- 

rAco  ^  On^ 

^cSddo?^- 

*-• 

i 

^ 

§sl 

o  o  o  o  o 

§ig§g 

^§g?^  §lagg 

iim 

I§??^g 

odd 

ooo  oo 

ooooo 

d  d  d  d  d 

o  d  o  o  o 

6  6  6  6  6 

0  d  d  d  d  d 

' 

** 

« 

1    II 

^ 

8gS 

l/^J-:t 

ooooo 

K\0   O   rH   C\J 
irMfM/M/MiS 

kkII;^ 

KRunSvS 

ooooo 

3S3?-3 

0  otr\o  00 

3:333  »t 

d  d  d 

d  d  d  d  d 

OOOOO 

o*  d  d  d  d 

ooooo 

d  d  d  d  d 

0000  00 

at 
1     ^' 

^ 

ooo 
ddd 

(D»o><J  Ocy 
fif  ot 

JW  Ol  <M  W 

§S3SS 

o  d  d  d  o 

(\J  UNCI  lf\J 
OOO  if\0 

&&s8a 

d  d  d  d  d 

JJO  (MJ 

§§«s§ 

66066 

§§§§1 
6  6  6  6  6 

H>r-     0  w  J 
U-.0      u\  00 

^-B    SB8 

6  6°  6  6  6 

•** 

1  is 

a 

III 

O  O  O  Q  O 

ilS^Sj 

ooo  if\0 

RS3tR3 

^§§,11 

ooooo 

W  <D  CD  <D  a 

K-3^  U\  tl\'^ 

ddd 

d  d  d  d  d 

d  d  d  d  d 

d  d  d  d  d 

d  d  d  d  d 

d  d  d  d  d 

6 6 6660 

4>  *  1.  a 
«  ? 

^•^•-; 

^  ir\a>  h-o 

-O  JJI-J 

CT-  J  CT  00  0 

cJrfrfNO-o 

J  JJ  lACO   O- 

41 

►  t-i          o 

o 

W^ 

O  fy  ©   Q  CD 

©E-SaS^ 

i^-asss 

cy  irsflO  CO  c\i 

^S'SSS' 

I^^S^ 

i§igr§ 

c  o  o  o  o 

ooooo 

ooooo 

ooooo 

ooooo 

6  666c   d 

e 

El 

k 

1 

if! 

<> 

ooo 

o3§l§ 

2JC^d-Ja; 

KNOJ  W  .H  ftl 

egcMW  («  -  CM 

ooooo 

0  0  0  d  0 

666  6  6  6 

1 

jlsi 

r- 

Mcg  (M 

JrflAd^ 

NO-  ^^J^ 

d  r^N^  ojv^ 

d<Dv<J  lAo 

»Aeo  00  t^eo 

nOnOnO  0.1-    CD 

•^^^2'°"<^ 

O    4J               > 

E5     ^ 

NO 

222 

§ssgl 

IS'§§I 

ss^lel 

S'Is'SS' 

!§§»§ 

S^S^II^ 

666 

ooo  oo 

d  d  d  d  d 

OOOOO 

6  6  6  66 

d  d  d  d  d 

ooooo  0 

s 

S,       in 

IB 

SlIsS 

SSsSs 

33^35 

slSSi 

ooooo 

d  dd  dd 

d  d  d  d  d 

y 

^ 

2!  d  V  a 

ll§ 

BISs 

33533 

O  O  O  lAO 

0  Q  irso  lA 

0  0  <D  OQ  f-- 

sgss« 

^Bl^l 

a 

1 

|5  sa 

odd 

d  dp  d  d 

d  d  d  d  d 

d  d  d  d  d 

d  d  d  d  d 

ooooo 

6  66  6 6  6 

^ 

KN 

III 

SSsIS 

l^lll 

S|Sgg 

?:S3SIS 

666 

6  66  6  6 

d  d  d  d  d 

6  66  6<S 

6  6  6  6  6 

d  d  d  d  d 

6  6666  6 

M          0. 

« 

pr\-0  0~ 

-0  lACIJ  JO) 

^s^sa 

K^(^K^K^iA 

^I/MTi^OnO 

Irfl^l 

CD  JOB  (D  i/v  r- 

So- 

t 

gas 

%lss^ 

»^»K-& 

^HS's' 

&«8  2;3 

r4  r4  ^  M  0] 

l§3tl 

M^ats 

II  II  II 

k  I. 

£5 


it- 


k  04 


i^ 


it 
5^ 


3-3-9 
ddd 

II  II  II 


Si 


if 


Jo  -o 


.s;5  tt 


it . 


S!    s 


454 


Impact 


i    i& 


S    £& 


g       8 

I  ii 


s|  s  s 


Ui 


>oo      ooooo      o 


OiTvOOlTv  OOOOiTilTS 
OOOOO  oooooo 
ooooo      oooooo 


585 
1*00 
395 
590 

uio 

1.15 
UOO 
1.00 
1.10 

|!J^S8:5 

rH    Ch  CT>  t^lTN 

J'   K-\  K%  K>  fO\ 

o  u^g  o  lA 

o  o  o  o  u-\»f\ 

D  O  O  O  O 

ooooo 

ooooo 

ooooo 

ooooo 

oooooo 

^.^.'^.  o  "^ 

^_  CN                0\ 

OvCO  CT^K\-a- 

CT,        OVCO 

^  CO  J  OJ  CO 

■1  "^  "0  ^  o  '^. 

)00      oo  o      ooooo      o      oo 


>  o      o 

)  O  O  Q 


i--*^  rHCO00.HCO         r-i^ 


JCOCOCOiTN       COOOCOO        COw 


:)  CO  CO  CO  K\  o 


)Ooo      ooooo 
>ooo      ooooo 


o  o  o  o  o  < 


ooooo      ooooo< 


\0  lf\0 

>  o      d  6  d  o  o  o 


On -3'  OS      J-  0\  OS       0\tc\0\0\<y\ 


>  o  o      o  < 


<y\  0\  tr\  tr\  0\       0\0\C 


?  II " " 

a    o  u  u 

o    ^  ®  ^ 

w     u  -a  "O 

i  isg 

=  T"  -d  a 


s 


s 

1 

=tJ 

K4 

* 

Ht 

^ 

|.S^ 

«H 

ViO 

,s 

^i| 

3 

Sk.3 


ooooo   oooooo 


ooo  ooooo  ooooo  oo< 

_  __r--(rHtH  iHOJCVIiHr-t  r-tOJOJ<MOJ  CyCVJf 

o      ooooo  ooooo  ooooo  oo< 

ooo  ddcJdo  ddcidci  o  S  t 


o      tf\iPi<rsir\ir\      oiTvOOiTs      oir\ooir\ 

2;     S-S^St:     o^SSs;     Soooo<     S^rlc^i^^      t^t^Co-SS     -^"J 


>  O       if\0  o  o  o 


o      ooooo      ooooo      ooooo      ooooo      dddoo      oooooo 


>  o      o  o  o      o  < 


?85S! 


8  0  o  o  o  o  o 

^n»^^         ^      ,,^,^  trio  «5Ert:2~ 

.'^.       "^"^  "^       '^'^'^'^"^      -*  "^"O  t>\tc\tr\fC\ 

»oo      oo  o      ddodo      d  do  d<5ddd     o  d  o  o  (d  o 


^      99^222^     2j2jSSJS      OSS5C      ooooo     ooooo     oooooo 

K      •r\  N-\  ^r^  K^  *r^      S\^^S\3\      osa\0\tDO\     ^t~^  "^-^      t~t~<r\  ir\co      K^K^K^  oj  o  as 


)Oooo      ooooo      oooc 


>o      ooooo      ooooo< 


?'0      o^^wr-^-     cot^«-t«Hco      oco^^-*      \ooot^ir\      «HO^OMr\o 

>^      !09P!C>!C'2>     CT\-*OiHJt      r-dsd-*c^     r^K^K^c6c^      cO-iCiOcp'O 
irH      ?yc«*^tr>»r\      ir\3-ifMfs7\      u^KsoSCd      "r-r-r-r-     a>c6cK<Soso 


K\-*  vo^oo 


3^S"    »P 


B  n 

alls 


!3ei 


as    ooo 


S3  S 

S3 


ss 


AIALTSI3  or  rtmvxL  mnjcTOHn™  raADnoa 

(V.rtloal  D.n«ctloo,  .t  C»nt»r  of  Spsn) 
!5     -   10    OIBlm  3PA,   (KAST  oisim) 

iflcoiCTrre  ciABs  d-s  (stsam) 


Sp.M 

Siaai- 

■  iOD 

AT»r. 
HMD 

BlM- 

r«tl(»l 

VUI  BmiCTIOiS 

Sim- 

wpUToraa 

MAim™  BBnjcTior 



1 

Bast  aird*r 

AT#r. 

Bast  Olrdar  Traok  and 
Bleotrloal  In«trii»aQt 

Hansr  Blow  Bfrect 

Haohanloal  Inatruasnt 

Avar.-ffloth  Inatruaanta 

Baet  Clrdar  Total  Impacts 

Bloctrlcal  Znotmaant  Hschaaleal  Instnuit.ATsr.Both  lastnaata 

IMn 

"x" 

I>.f. 

Xltot. 

NiOh. 

both 

Djna.. 
Cjjl^      Kagnlf 

11             12 

Dynaja. 
Ib«nlf. 

IHpact 

iBpaot 

iMin 

X 

io. 

Col.l 

K.F.B 
2 

B.P.8. 

5 

k 

Inobsi 
5 

7.P.S. 
6 

Isatr. 
7 

Imtr. 
6 

Iiutr. 
9 

laf. 
10 

Cf . 

t9^ 

Ik 

Bar. 

Ilgl2 

Magnlf. 

Max. 
laf. 

Car. 

Per 
CSQt 

Hai. 

Daf.       Baf. 

Far 
Caot 

tbi. 

Baf. 

Ear. 

Par 
Cant 

152 

52 

0.57 

0.k79 

k.65 

O.kio 

O.keo 

O.kks 

O.OIS 

19 
0.k25     0 

20 
015 

21 
5.7 

22          23 
O.kSO           0 

2k 
0 

25 
O.kSS 

26 
5.006 

27 
1.8 

126 

18.9 

1.5k 

0.k05 

0.025 

O.kSO     0 
O.kSO     0 
O.kSO     0 
O.kko     0 
0.W.0     0 

127 
126 

26.6 
50.1 

1.89 
2.15 

O.kTJ 

k.65 

0.k05 
o.kio 

0.k52 

0.k29 

0.02S 
O.OkO 

0.008        5 
0.010        k 

12 
00 

0.058 

0.009 

k.22 

0.032 

0.006 

k.oo 

020 
020 

k.9 
k.9 

0.k90     0.010 

2.1 

0.k6« 

0.015 

S.k 

125 

124 

55.6 
ko.o 

8.52 
2.8k 

0.k6k 
0.k75 

k.70 
k.65 

o.kio 
O.kio 

0.kk5 
0.k20 

0.k28 
O.klS 

0.030 
O.OkO 

0.01k         2 
0.017         2 

Ik 
55 

O.Oks 
O.OSO 

0.016 
0.021 

2.81 
2.58 

0.058 
O.Oks 

0.015 
0.019 

2.5k 
2.37 

OkO 
030 
030 

9.8 
7.3 
7.5 

O.k90     0.010 
O.k70  -O.OIO 

2.1 
-2.1 

0.k6s 
O.kSS 

0.020 
0.010 

k.S 

IJO 

151 

129 
125 
21k 

»0.2 
kl.7 
k2.6 
kk.2 
k5.8 

2.85 
2.96 
5.02 
5.13 
5.25 

0.k6l 
O.kSl 
0.k68 
0.k« 
0.k78 

k.71 
k.62 
k.68 
k.69 
k.6k 

0.590 
O.kOO 
0.395 
0.590 
0.560 

0.k20 
0.k50 
0.k20 
O.kSO 
0.390 

O.kOS 
0.k25 

o.koe 
O.kio 

0.375 

o.oko 

O.OkO 
O.Oks 
0.030 

o.oso 

0.017         2 
0.019         2 
0.020         2 
0.021         1 
0.023         2 

3S 
10 
25 

kS 

17 

O.oko 

0.050 
0.050 
0.050 
0.060 

0.021 
0.025 
0.02k 
0.025 
0.027 

2.17 
2.03 
1.20 
2.22 

O.oko 
O.Oks 

O.Oka 
0.030 

0.055 

0.019 
0.021 
0.022 
0.025 
0.025 

2.10 
2.1k 
2.18 
1.51 
2.20 

O.kSO     0 
O.kko     0 
O.kko     0 
0.k20     0 
O.kio 

020 
030 
030 
010 
0 

k.9 
7.5 
7.5 
2.k 
0 

O.keo  -0.020 
0.500     0.020 
0.k70  -0.010 
O.keo  -0.020 
O.kSO  -0.050 

-k.2 
k.2 
-2.1 

-e'.2 

o.kks 
O.k70 
O.kSS 
o.k«0  - 
O.kSO 

0.025 
0.010 
0.005 
0.015 

0 

5.6 
2.2 
-1.1 

-3.k 

122 

121 

52.5 
55.5 

3.70 
3-95 

10.0  3 
6.5  1 

0.k6l 
0.k6o 

k.71 
k.71 

0.570 
0.365 

O.kOO 
O.klO 

0.585 
0.586 

0.020 
0.0S5 

0.030       0 

0.05k          1 

.67 
.62 

0.050 
0.050 

0.035 
O.oko 

0.66 
1.25 

0.025 
0.055 

0.033 
0.057 

0.76 
l.kS 

0.590  -0 

0.k20     0 

020 
010 

-k.9 
2.k 

O.kSO  -0.050 
O.keo  -0.020 

-lO.k 
-k.2 

o.kio 
o.kko 

0.055 
-0.005 

-7.9 

206 

57-5 

k.07 

5.7  S 

0.k51 

k.75 

0.560 

0.360 

0.370 

0.050 

0.056         1 

.59 

0.070 

0.0k2 

1.67 

0.060 

0.039 

1.5k 

O.kio 

0 

O.kko  -O.oko 

-8.5 

o:k2S 
O.kSO 
O.keo 

"k'5 

195 

59.5 

k.20 

7.5  • 

O.kkk 

k.79 

0.5ko 

O.kOO 

0.370 

0.060 

0.059         1 

•Sk 

0.060 

O.Oks 

1.53 

0.060 

0.0k2 

l.ks 

O.kOO  -0 

010 

-2.k 

O.keo  -0.020 

-h'i 

-0.015 
O.OIS 

'  ■? 

209 

60.0 

k.25 

1.9  S 

0.k9k 

'►•57 

O.kOO 

O.kOO 

O.kOO 

0.050 

O.oko         1 

■  25 

0.070 

0.0k6 

1.52 

0.060 

O.Oks 

l.ko 

O.kSO     0 

OkO 

8.9 

0.k70  -0.010 

-2.1 

'sik 

196 

60.5 

k.28 

9.5  s 

0.k61 

k.71 

0.570 

0.370 

0.370 

0.050 

O.oko         1 

25 

0.070 

0.0k7 

l.k9 

0.060 

O.Okk 

1.36 

O.kOO  -0 

010 

-2.k 

O.kSO  -0.050 

-10. k 

O.klS 
O.kSS 

-0.050 

O.Oks 

0.030 

O.OSS 

0.060 

-6.7 
9.7 
6.7 

210 

65. J 

k.k8 

1.9  » 

0.518 

k.k8 

O.kOO 

0.k70 

0.k35 

0.060 

O.Okk         1 

36 

O.Oks 

0.052 

0.87 

0.053 

O.OkS 

1.10 

0.k60     0 

050 

0.515    0.05s 

7.5 

197 

65.9 

k.55 

1.9  3 

0.519 

k.k7 

O.kio 

0,k30 

0.k20 

0.050 

O.Oks         1 

11 

0.060 

0.055 

1.15 

0.055 

0.0k9 

1.12 

0.k60     0 

050 

12.2 

0.k90     0.010 

2.1 

0.k75 
O.kSO 

til 

65.5 

k.6t 

5.9  « 

O.kSO 

k.65 

0.590 

0.k20 

O.kOS 

0.070 

0.0k7         1 

k9 

0.060 

0.055 

l.k6 

0.075 

0.051 

l.k7 

O.keo   0 

050 

12.2 

0.500     0.020 

k.2 

7.9 

13. S 

120 

67.0 

k.75 

5.6  1 

0.k65 

k.70 

O.kOO 

O.kSO 

0.k25 

o.oko 

0.0k9         0 

62 

0.070 

0.0S8 

1.21 

0.055 

0.05k 

1.02 

O.kSO    0 

070 

17.1 

0.550     0.050 

0.S05 

196 

67.7 

k.80 

2.2  ■ 

0.519 

k.k7 

O.kOO 

O.kko 

0.k20 

0.060 

O.OSO         1 

20 

0.060 

0.059 

1.02 

0.060 

O.OSS 

1.09 

O.kSO     0 

050 

12  2 

0.500     0.020 

k.2 

O.kSO 

O.OSS 

7.9 

212 

68.k 

J-S 

10.5  S 

°•^'t 

k.82 

0.395 

O.kis 

O.kOS 

0.055 

0.051         1 

06 

0.065 

0.060 

l.k2 

0.070 

0.056 

1.25 

O.kSO     0 

OkO 

9^8 

0.500     0.020 

k.2 

0.k7S 

0.030 

6.7 

199 

69.0 

k.89 

6.5  I 

0.k96 

k.56 

O.kOO 

O.kks 

0.k25 

0.070 

0.OS2         1 

35 

0.085 

0.061 

1.39 

0.078 

0.057 

1.57 

0.k70     0 

060 

Ik. 6 

0.550    0.050 

10. k 

0.500 

O.OSS 

12. k 

215 

70.6 

5.00 

O.kBk 

k.6l 

O.kis 

O.kko 

0.k28 

o.oss 

O.OSS         1 

00 

0.060 

0.06k 

0.9k 

0.058 

0.059 

0.98 

0.k70     0 

060 

Ik. 6 

0.500     0.020 

k.2 

0.k8s 

o.oko 

9.0 

116 

71.0 

5.0k 

5.3  s 

0.k76 

4.65 

o.kao 

0.k60 

O.kko 

o.oko 

O.OSS         0 

75 

O.OSO 

0.065 

0.77 

O.Oks 

0.060 

0.75 

0.k6o    0 

050 

0.510     0.050 

6.2 

O.kSs 

o.oko 

9.0 

200 

72.1 

5.12 

6.2  3 

0.k65 

k.70 

0.370 

O.kOO 

0.58s 

0.050 

0.057       0 

53 

0.060 

0.067 

0.90 

O.Oks 

0.062 

0.75 

O.kSO    0 

020 

k.9 

0.500     0.020 

k.2 

O.kes 

0.020 

k.S 

201 

77-5 

5.k7 

k.O  3 

0.551 

k.k5 

O.kSO 

0.505 

0.k76 

0.070 

0.06S         1 

08 

0.065 

0.078 

1.09 

0.078 

0.071 

1.10 

0.520     0 

110 

26.6 

0.590     0.110 

22.9 

0.555 

0.110 

2k. 7 

202 

79.k 

5-65 

O.k  I 

0.k98 

k.56 

0.kk5 

0.k90 

0.k6e 

0.065 

0.069         1 

25 

0.110 

0.081 

1.36 

0.098 

0.075 

1.31 

0.530    0 

120 

29.5 

0.600     0.120 

25-0 

0.565 

0.120 

27.0 

116 

80.6 

5.72 

0.1  B 

O.k70 

k.67 

0.k20 

O.kSO 

O.kSS 

0.070 

0.071       0 

99 

0.090 

0.08k 

1.07 

0.080 

0.078 

1.03 

o.kgo    0 

080 

19.5 

O.SkO     0.060 

12.5 

0.515 

0.070 

15.7 

205 

82.2 

5.82 

k.3  I 

O.H5 

0.055 

0.07k       0 

7k 

0.k70     0 

060 

Ik. 6 

0.500     0.020 

k.2 

O.kSS 

O.oko 

9.0 

U3 

8k. 0 

5.96 

O.k60 

k.71 

O.kOO 

0.390 

0.395 

0.080 

0.076        1 

05 

0.080 

0.091 

0.86 

0.080 

0.06k 

0.95 

o.keo   0 

070 

17.1 

O.k70  -0.010 

-2.1 

0.k75 

0.030 

6.7 

Ilk 

85.0 

6.(9 

0.k«6 

k.69 

O.38O 

0.570 

0.375 

0.080 

0.079      1 

01 

0.110 

0.095 

1.18 

0.095 

0.086 

0.k60     0 

oso 

O.kSO         0 

0 

0.k70 

0.025 

5.6 

20k 

85.0 

6.(9 

6.5  I 

0.k65 

k.61 

0.k05 

O.kSO 

9.kl6 

O.OJS 

0.079        0 

95 

0.100 

0.095 

1.08 

0.088 

0.086 

1.02 

O.kSO     0 

070 

17.1 

0.550    0.050 

lO.k 

0.505 

0.060 

15.S 

115 

87.0 

6.16 

6.k8 

0.k58 

k.6l 

0.590 

0.590 

0.390 

0.080 

0.065        0 

97 

0.090 

o.o9r 

0.95 

0.085 

0.090 

0.9k 

O.k70     0 

060 

Ik. 6 

O.kSO         0 

0 

0.k75 

0.050 

6.7 

207 

68.0 

6.25 

7.2  3 

0.k77 

k.6k 

O.kOO 

O.kOO 

O.kOO 

0.060 

0.06s       0 

71 

0.080 

0.099 

0.61 

0.070 

0.092 

0.76 

O.k60     0 

050 

12.2 

O.kSO         0 

0 

O.k70 

0.025 

5.6 

206 

88.5 

6.26 

1.1  I 

0.k90 

k.59 

O.kOO 

O.kSO 

O.klS 

0.070 

0.086       0 

81 

0.080 

0.101 

0.79 

0.075 

0.095 

0.81 

0.k70     0 

060 

Ik. 6 

O.SIO     O.OSO 

6.2 

0.k90 

O.Oks 

10.1 

20? 

B9.k 

6.55 

k.es 

0.k98 

k.56 

0.k20 

0.k30 

0.k25 

0.060 

0.087       0 

69 

0.080 

0.105 

0.78 

0.070 

0.095 

0.7k 

O.kSO     0 

070 

17.1 

0.510    O.OJO 

6.2 

0.k9S 

O.OSO 

11.2 

(a)  All  d»fl«ct: 

(b)  All  d*fUct: 

(c)  Dlaansioo  ": 
•ff«ct  on  tl 


ns  shTWQ  la  Colus 
OB  BhovQ  aro  in  li 


lOASUKED  TTATIC  DKTLICTIOf 

•  ctrlcsl  Defl»oto»t»r=O.UlO 
cbanlcal  DeflvctoBBtar  =0.460 
=  0.W5 


,    10,    15,    19  and  22  ar*   talWD  from  Tabl»    5, 
&Dce,   althar  north  or  •outb,   fro«  the  c»nt»r  of  tho  1 
I  as  the   "etatlc  deflectlone"  In  tbs  1 


blov  daflectloaa"  for  the  1 

Klectrlcal  Defleotowtar 
Hecbanlcal  Defleotoaetar 


THBORBTICAL  STATIC  DEFLBCTIOH 
(Baaed  on  grose  moMent  of  Inertia  at  oenter) 


<  rrrolutlon  per 


Br  at  tha  tina  the  crank  pine  are 

in  poBltlon  for  TTWTliwn^  he 

"-'•  "K" 

laotrlcal  and  nechanleal  dariectoi 

letara  and   their  comparlso 

DBFtffiTIOS  TACTOR 
(Maaeurad/Theoratlcal ) 
Blactrlcal  Baflectometar   =l.lkO 
Mechanical  BeflactoMtar  =1.532 
Ayaraga                                      =1.256 

0.00218 
0.00256 
0.00257 


1<9.5 


5.5f 


5.TI. 
J.91 


1.^ 


lt.71. 
5.12 
5.25 
5.38 


9.71 
5.7« 
5.M 


14.56 
1..55 


I..52 
I1.27 


BU  nruonoB 


0J.55 

OJiTO 
0^470 


0J»70 
Ojj60 


0Ji90 
OJ<90 
0Ji95 


0J.95 


tm 


WCOMOTIVI  CLUB  ll-A   (S^ 


SBD-ucFurrnns 


Cf.     D^lf 


Bkrt  Oirdv  Tr*ak  uri  E 


(90     0,007         ii.28         O.QliO       0.007         5.71 


(90  0.028  1.07 
,085  0.050  0,^ 
.(^5    0.050        1,17 


,085  0.(97 
(90  0.C98 
,050     0.(^8 


1.060       O.CLS         IJJ 
J.O5O       0,0(42         1.19 


).060       0.066         0.9J 


-1  Igtrj-^. 


■fS.    S3: 


fs. 


.QliO 
.015 

3.9 

7.' 

.015 

<.9 

1.9 

0.O5O 

5.9 

>.«0 
J.OI5 

5.9 
2.! 

3.050 

-5.1 
1.9 

0.005 

B.015 

D.015 

l.BO 

^.'9 
2.9 
5.9 

-2.< 

'.cm 

-13.7 
.2.0 

D.050 
0.015 

0.025 

-5.9 
2.9 

Il.9 

0.025 

0.050 
0.055 

I..9 

9.e 

10.8 

0.O65 

12.7 

0.O66 

j!ii5 

12.7 
19. 

I  7,  8,  10,  13,  19  ■ 


t  teriactloaa  for  i 


it<m»UT       OJ^ 


THSCRETICAI    STAITC    S 
bat   girder       OJ1I5 


Impact 

P*\(D          (OK^(^^<o  KN«)r-<-"0  _jw-^<o^  -otricy»-»K\  >«  unksks'O  wO-Jtww  -tf-S<-<<w 

o' o'  °    oi  o* J »A-:  o  J lA J p3  h^^'j j4  oj  '^'f  if o  if <>:^s'if  rJsJsJr;!^  ;3^4^ 

§?§  §l&§g  iSSIS  SfagI  g§l?§  l^88§  3§S3a  is^a 

^  <$  cS      ooood  oo^oo  oooc5o  <3orfdo  drfodd  oocjoo  oooo 

OJ(Dt^^     a)(y>ir.Of^  trw^OiAOi  wwojoj©  <y^f-wo^  ^-.  f*-S*o  o^^o^oo^  o^o^c^^o 

_io(y      o»Ac»jiA»H  <Jot^cj-i  _i-^<ie5<3  -4»<^^(5c^d  r-^      J^At^  lAocJr^tA  lAiAiAtp 

8igS    gS-Sg'S  S§7?sS  8S!g8S  82(;3^«  t3oS8-5  C^'S&^S'  S'5'^ 

odd  Sgoog  <S  o  S  (^  g  cddcd  o  S  6  tS  o  d   odd  ^  <S  o  <S  d  dddd 

»»»   SS'SS^  S':8$:S;o  S;?S«:8  S®^S«  PP^^P  J:^^*^  '?*^'? 

odd      ddddd  ddood  doood  ooooo  ooooo  ooooo  oooo 

oQO      oooifMA  OOQOO  OOOOO  oiTsinoo  0!fv*fMr\0  tr\u\ooo  OQOO 

3SS:    RS'SSIS  S,S^3a_  Stalls  33^*^.  iRsS5!R  «K:X.iR*.  M«K 

^J^       _:JO_:J(7^J  J  lAOD  «  (y  <VJ  <Mf\<y  UN  (M/NCyWO  _a  O- O  «  ©■  UN^O_^^  O  O  O^  «l 

do-o-      dwcOwoJ  cJJJ«^»?  K^<>;j«^J  ci-^rAiAcJ  cJwJm^o;  k^wwoJw  Jw<J.A 

oioioj      ft)(MifNeoir>  iT^tDOOo  ocDtoo©  eoojoorvj  irstDiTiOBD  W4f\ft^iM/^  unwwo 

S§§   sssoS  saeaa  asaaa  sSaas  ssaas  Sssss  Soss 

ojM^f^rA  H^^Au^K^H^  H^B^J^r.J  h^,  tr.  »«>  »A  cJ  <-?  ^  oJ  Oj  CU  »A<-JoI'Jt^  _:?  OJ  <y  »/ 

tfsoifso  oifM/NOO  OOOOO  ooooif\  ooirMT-us  ootr\00  oirsiTiO 

ooo  osssa  a^^&8?i  ^,^.?^.?  ^.^.^.^.^.  ^.°^^.°  ^.^.°^.^  ^A°A 

«>a)«D      (Dt~-r-r-r-  t-^w^j  ^trsw^w  ir^w  ^-Jr-  _d^ic^<y_s  w_at^_ah-  _4t-h--* 

odd        d  <-•' ^'  -J  J  rJ  rA_:JfA»A  »Acy -ilA-i  oI-^»ApA<J  *«^-:3u^-ift^  _JtArJ»AJ  »A^J»A 

iTM/sifv     ifvoooo  ootrsco  cifMTNOifs  wMTiOOO  ouMr\u^o  irsoooo  oooo 

888   ssssg  ss^jas  sjsaas;  saaas  ««s?!8!  sssas  s.o.o.a 

S,Si^SS>  «!^«5  ~S55S.  8SSRS  ^^'c'^'*.  ^^':'^':  ^.^.^.^ 

<S  tr,G  >J  o  o  tS  fi  o  <5  <S -^  ri  o  tS  <-I<yH^-^ir>  cuir-f^r^oJ  ^njAiAtAd  ddo^w 

mil  tiiii  iiiti  iiiii  iiiii  mil  till 

<S  o  t$  G  S  <D  6  a  <S  G  <S  d  t5  <S  <$  ddddd  ddddd  ddddd  dddd 

MO-3-^<A  -:tO«0^(VI  >^^a)lD(^  >C<^-^^^  <MM(^(^«>  00(MO(^  <DO^<D(U 

(vJ^r^rHO  pArA>4^d  d  tAJ  fi  lAi  OrAdrJfA  cJcJf^lArJ  tAr4{0fAK^  ri  tC\iJ  C4 

nm  SsSII  IfssI  ^fllS  ffffs  slls^  sfsl 

ddddd  ddddd  ddddd  ddddd  ddddd  ddddd  dddd 

\f^tr\^       O0*rs*r\0  tCV^^'^tC'  SGSl*'^'*^R  floOOt/MTi  (OOffiOquN  mnOO  *5*1  lAm  tfN<o 

d  d  d     ddddd  ddddd  ddddd  ddddd  ddddd  ddddd  dddd 

HS  511'S^  yl*!*  fS'l^J?  fISII  ^^p^l  ^^*p^  p^^^ 

d  d  d      ddddd  ddddd  ddddd  ddddd  ddddd  ddddd  d  d  d  c' 

trifM/v      i/\ooifvjN  ootfsoo  ovvirNPirv  ir\oir\oo  ooooo  oif\ooo  qooo 

35-?,    S.3IS3S  RRSKS  SKfeRK  Sk3»»  KC^KRK  ii(?v?.RIR  SlRKtR 

ddd  ddddd  ddddd  ddddd  6  d  6  <S  <3  ddddd  ddddd  dddd 

jjj  "^^^si  :issj3s  si-Adi  isisi  s^rfPii  T^idsi  if:iii 

tU  2HJS  wS^SS  5^8^»S  ^^tU  ^§#5§  SliSIJS  S^2 


4SS 


IF" 


15^  g 


|S**5 


>       a 

nil 


■s    s 


111? 


HI] 
as   ' 


::> 


.^.h 


S&i 


s    is 

3      «  »  Si 

i    1 1 2 


8 


«>  g,  S.  «D 

■s    iidddj  :;° 


:ii, 


3   s 

*     E 

Z   I 

;a    ^     p 

-is 


a " 
-i 

d5 
^% 

-1 
i  I 

*  i  s 


.   j§  idddj  5? 

o       *»  t     "•   9 

"    S  c            I  ^ 

-^.*"  ^uk    £"«g 

-""II  g||^|gS 

J  S  q  'a  I 

Hi 

•5 -Si 


;::£: 


si 


456 


Impact 


II. 


il. 


||IS 


•l:a: 


^i&i 


^        o 


llli 


>  o  o  o  o      o  rto  o 


gg«g&    SS«B       8S«8S    SE«S 


>ooo      ooo< 


o     8«gg3    o8^S&    8S8^«    ^?^^?    ?°^^^    ^°?o?    ^^?^?     ?^^ 

f*       xOOx^olyscR       CQ&CQOvOv        (DCT\.-i!>0         ^^JK^t'^.*  \OOJiriRjCJ         l^J^^f^\0^         r^iyoOO         VOCO>0 


o      ir\opop      OQoop      ooo< 


i3R;R3 


;sa: 


>   >H  O  O  iH   C 


o      o  o  o  o 


8    SSS22     S22SS    SSSS       SSSSS    ?§§?«    gSSSS     gSS 

O   OOOOO   OOOOO   OOOO     OOOOO   ooooo   ooooo   ooo 


^  O  O  S    O  O  O  ( 


i-HtH    r^^f-t-HO    »-t^^f-tQ    OOQQ^ 


Wa    33    BMHWy    HH^^H    3»S»      X37SX    S»»SV    S»V»V    >»( 


M?   BS   SMHH9   HH33H   3333     33333   33333   33333   33H 

?l°§3    IISSS     I§I§1    §SSI       ISS?S    §§§IS    ?§§?2     §§8 


88S3&  8SS«  '^^^^^  88^&8  S«^«3  !?&& 

iTWOr— f*>CO  »f\  CM23  On  ■-*  CD -=r   *^  f~  K^a^t^COCD  t— CA  C^  --■  ^0  O  Ol  >r\ 

tfsG  <r\  ^o  tr\v\ir\ir\  ^^^lf^tr^u^lr^  '^"^iQlf^^  -lom  o  Ss  Sn  lf\m  If\ 

\oSr-^Of-  r-r-r-t-  r-i^r-(^r-  p-r-t—r-r-  r-r-coi—r-  ^-r-r- 

doooo  OOOO  ooooo  ooooo  ooooo  ooo 

OOOOlA  lAifMrMAO  irMfNtAlfMA  irMf\tfMP.iA  OOOOO  tfMAiO. 

Jt-*-*a3^  coir>j=t^K>  '^'^'5t.'5t/£'  "SkS  Js-S  ?\  ?\iS  S\'£''?\  vo^^ 


-sa; 


rN^m^UA        iTi  iTv^O  3  ^J 


1  II  II  li 


1+  ^ 


J  g  ».  >.     V 

<    **   o   «        -^ 


a    s 


5  Ss 


SSIS 


1^   I 


SS6t     I 

(S  »  <  M        *■ 


UULTBia  0?  VBRTiCiL  DBFLBCTOIISTKB  B 
(VERTICAL  DEFLBCTIOI  AT  CnTTffi  OF 

122<   .  0"   OIREBR  SPAI 
LOCOMOTIVE  CUBS  ll^   (8TEAM] 


MKAI  DBnJtCTKna 


laatr.        loatr,       ^^^ 


■.pa.   i.p.s, 


ae.o 


iuU) 
1-53 


6.24 


Boll  irf«,t 
0«n*«tlra    Cwit 


JlJS 


l:g 


tlm  Dgl^      Hftpiincr 


o!o)5      0 

013           i'.l 

3.01.5        0 

0.0I4O      0 

Xi           1. 

1.050      c 

oes        2. 

as  s 

OJO           !. 

0.075      0 

0J8           1. 

1.060      c 

0U3        1. 

050          1. 

0.065      0 

051      1. 

0.O7O      0 

051.         1.3 

1.070     0 

056           1.! 

1.055      0 

057        o.< 

3.070        0 

?:S?  S 

Sg    S:] 

066          0.9 

.065      0 

067          0.9 

070        o.e 

.055      0 

(771          0.7 

.065      0 

073          0.1 

oau        0.' 

3.090        0 

0«          0.9 

3.065       0 

0«          0.7 

«5          1. 

'.065       0 

099            0.: 

1.115      0 

3.105       0 

loe        1.0 

3.0B5       0 

107          0.7 

3.100       0 

109          0.9 

!2o     0 

112          I'.l 

HAZiiani  ctnjcnon 


3.653        0 

723          0.0 

.658        0 

7U7          0.1 

3.652         0 

O.MS        0 

7UB          0.0 

'.ia     0 

1.671        0 

733          0.: 

1.687        0 

752          0.1 

0.713        0 

7«          O.t 

0.70a      0 

78J          o.c 

1.709        0 

7au        0. 

1.739        0 

61.9          0. 

1.751       0 

622          o.c 

0.7311 

0.1 

1.676        0 

1.706        0 

831          o.i 

0.706       0 

616          o.t 

o.«,5      0 

765          O.C 

1.705       0 

655          0. 

1.665        0 

615          0. 

1.696        0 

0.6a.        0 

621.          0. 

0.6^5        0 

835         0. 

0.65U        0 

z    t 

o!67l        0 

au        0. 

676          0. 

0.6W        0 

659         0. 

l.WU        C 

6«         0. 

>.796        C 

916          0. 

1.730        t 

895          0. 

915        0. 

0.770        0 

Z    S: 

0.716        0 
0.7J5        0 

856  0. 
875          0. 

5o!u 


160  25.8 
o«  15.3 
,09li      15.1 


I  p«iltl«B  far 

>•  thaorvtlMl 


T1)««rwtl««l  1 


(tUuur*d/^Mr»tleAl] 


i  rage  iviarKsr  -  rieabe  iriseri  ruiuuui  nere 
Page  Marker 
Insert  Foldout 

is  a  i^age  MarSrer  -  Mease  Insert  Foldout  here 
Page  Marier 
Insert  Foldout 

s  a  Page  Marker  -  Please  Insert  Foldout  here 
Page  Marker 
Insert  Foldout 

Pa^s  Mor^e-t  -  P/e.a5e.  XriSe-r-t  f^/dotut  h&r-e. 

s  a  Page  Marker  -  Please  Iwsert  Foldout  here 
Page  Marker 
Iwsert  Foldout 

MXR.K6P.  -  PLeXSe  INSeW  FOLDOUT  Hep.e 
INSeW  FOLDOUT 

I  .NIC'  rliMKrr      I  lease',  hiMir  I'oI<!(hi!  In  j  < 
I  iujc  ri<irk(  I 
I  used  rolcloiii 

rsye  JM.^T\eT  -  xfeaj^  I^S^H  Y^lJ&ttf  Jiefe 


Marker 


eass  mser 


dooT  nece 


Impact 


457 


on  this  span,  is  38.80,  or,  the  increase  due  to  speed  is  found  to  be  14.8  percent.  From 
the  measured  stresses  (see  Table  11,  column  7)  the  increase  is  found  to  be  19.8  percent. 
In  the  upper  portion  of  Tables  19  to  22,  the  ordinates  of  the  theoretical  stress  influ- 
ence curve,  and  the  actual  measured  ordinates  for  some  one  run  have  been  plotted.  The 
increase  in  area  is  apparent  and  it  may  be  interesting  to  note  that  actually  there  is  not  a 
measurable  stress  until  the  front  axle  of  the  locomotive  has  traveled  an  appreciable 
distance  along  the  span.  This  distance  simply  represents  a  lapse  in  time,  and  seems  to 
vary  from  0.042  to  0.077  sec.  If  we  consider  for  a  moment  that  these  measured  ordinates 


1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1        ^ 

irj  sfr-GSS    <di~JG    /<=>      ^  -  .     ' 

L^i^ntmfij^ai   tor^cG         ■  j/ 

_ i         , 

^ 

±                                   _  -      - 

±              — _    X        "          z      -     . 

i .. 

i  

.  .      .      _^       _       _        .     _      _„_< ,_    _. 

/ : 

' 

::::::::::::::::::::::::::::::. -ii  <'::!.: ::::: 

^^ 

T        i              ^    ' 

_^     t* 

•^  *' 

;"'        \t"""           ":::  ::::■':: 

'^'^                    ,.'                      

.-'''    %.  J      ' 

, 

Tic 


20      30      40      50     £o       70      80      90      100      no 

SPB^a  MILES  REIZ    HOUI^. 

SPEED  EFFECT 

30 


• 

< 

,. 

1 

•                  ■*  • 

>                                                                                                 1 

t                                          • 

_.J 

r 


20      30      40       so       GO       70       SO       9a 
SPEED  — Ml L.E.5   PBIS    HOUf2. 
ROLL   EFFECT 


SPEEO     E.FFE.CT 

/AND 

ROL-l-     EFFECT 


LOCOMOTIVE.      d_/^SS     PS -A 


458 


Impact 


represent  deflections  at  the  center  instead  of  stresses,  it  will  perhaps  be  better  under- 
stood as  something  to  be  expected,  as  it  would  require  a  force  approaching  infinity  in 
magnitude,  to  deflect  the  span  in  zero  time. 

Roll  Effect 

As  the  springborne  weight  of  the  locomotive,  in  motion,  oscillates  about  a  hori- 
zontal axis,  it  has  the  effect  of  increasing  the  pressure  on  one  rail  and  decreasing  it  on 
the  other  rail  a  hke  amount.  This  rolling  action  is  probably  set  up,  not  only  by  track 


in 

(UN 


llllllllllllllllllllllll    / 

THeor^e-f-ical    incr-ecise       (_ 

ir-i    sii~ess    c/t-je     fa    —    ] 

Cei-iffifljcgal  Fcpr-ce       <  , 

::::::: — i::":::::::"::""":::::::::::::::  ::2:::" 

/_^.   . 

t 

— ::::::::::::::::::::::::::::::::::::::>  :::::i:: 

/         _ 

i     ^ 

.     ' 

_                         ^ 

:___:.:__:::_:..:_.•:::::•/ 

_____   •  _        ^r 

I .' 

:    _  _           •        ',.'•• 

; ,y : 

^ '' 

,*' 

*     ^,-'' 

■  --^ — 

so     30     40      50     GO      70     ao      so 

SPaECP  -  MILES    RES     HOU/e: 

SPEEO  EFFE-CZT 


T 

j[ 

.                 .^--     J.- 

-  - 

T                                                              • 

< 

^ 

'                                                                        • 

•        '                                            • 

■ 

1                       •           ,                       ,                      '                  ' 

' 

~r ,                                                                  1 

•                                   X           X 

.      '                   '           ^      \ 

•    •               ' 

f 

r 


in 

Ij  ID 

r 


so       30       ^O       30      GO        70      <SO       90 

3PEEO>- MIL-ES  PEie     HOUI^ 

ROLL.  EFFECT 


Fig.  29 
55-10      QIRDER      SR^M 

SREEP    EFFECT 

AMD 
ROI_l_    EFFECT 


LOCOIVIOTIVE       CU/^SS    QC^-I 


Impact 


459 


inequalities,  but  also  by  the  locomotive  weaving  or  nosing  from  side  to  side.  The  period 
of  this  roll  is  presumably  sinusoidal  in  time,  but  the  spans  tested  were  too  short  to 
obtain  any  idea  as  to  its  frequency  from  the  stress  influence  curves. 

When  the  track  is  centrally  located  with  respect  to  the  span,  the  magnitude  of  the 
increase  of  pressure  on  one  rail  can  be  found  by  subtracting  average  stress  or  deflection 
of  both  girders  from  the  maximum  stress  or  deflection  found  in  either  girder.  It  has  been 
pointed  out  however  that  the  track,  on  both  spans,  was  somewhat  off  center,  so  this 
eccentricity  must  be  taken  into  account  in  arriving  at  the  actual  roll  effect. 


' 

1   M  1   1  1   1   1   1   1  1  1  1   1   1  1 

ir-i  &f-ness    duje    +o 
Cerrf-i-iFUcgal  roi~c& 

/ 

/ 

c 

*,' 

7 

' 

/ 

• 

/ 

. 

/ 

/ 

/ 

. 

• 

• 

/ 

/ 

, 

/ 

. 

y 

. 

/ 

/ 

• 

^ 

. 

1 

r' 

, 

X 

- 

k 

*■ 

^ 

a 

= 

t= 

" 

L— 

_ 

_ 

L, 

^, 

'• 

u 

- 

- 

- 

/^.S.E.,A    Desic]r-i   Sped/^icai-ioi—i 

a>r-ic=/   /Sa-hir-icL 

^fS^Jlea     > 

1 

- 

, 

• 

, 

* 

, 

p 

• 

• 

• 

• 

• 

- 

, 

. 

J 

• 

• 

. 

/.o  3.0  3.0  <qo  so         (Z.o  7.0 

5PEEO  -  I^BK/aUUTIOMS     PEIZ     3ECOSIC? 
(ir-.p.S    =  IJ}    a93   rn ph.) 

ROLL    EFFECT 


a 


(A 

^-  r 
in  ^ 


I.O  2.0  3.0  40  5.0  (S.O  7.0 

SPE-E-C  -  ISEVOUUTIOhJS    PE/Z   3ECONI? 
(1  n.p.s   =   14.093  m.p.h) 

5PE.E.D     EFFECT 

25 


1.3 

in  . 

UJ 

r 


in 

In:? 

0  " 


Fiq.  30 
55'- 10    c^if^ae.rs.    sp/°>.m 

SPEED      E-FFECT 
ANIP 

ROLL     e:ffe.ct 


LOCOMOTIVE     CL/\SS     K4-S 


460 


Impact 


At  the  bottom  of  Table  11,  the  average  static  or  crawl  stress  is  given  as  7.28  kips 
per  sq.  in.  in  the  east  girder  and  7.86  in  the  west  girder,  with  an  average  of  7.57.  The 
stress  in  the  west  girder  is  0.29  kips  per  sq.  in.  greater  than  the  average,  which  indicates 
an  eccentricity  in  static  loading  of  3.8  percent.  For  run  244  at  a  speed  of  8S.4  m.p.h.  in 
this  same  table,  we  find  the  stresses  to  be  6.66  in  the  east  girder  and  11.23  in  the  west, 
with  an  average  of  8.94.  To  eliminate  the  influence  of  eccentricity,  the  average  stress  of 
8.94  must  be  increased  by  3.8  percent  which  would  give  a  stress  of  9.22  in  the  west 
girder  if  there  were  no  roll.  The  stress  due  to  roll  is  then  the  difference  between  9.22 


(A 


r 

~ 

~ 

- 

"" 

"" 

~ 

^~ 

~ 

— 

'" 

~ 

■" 

r- 

THeor-e^ical  ii-icneass 
In    s-fr-sss     cdi-/a     /o         ~ 
Carrf-r-ifLicjcil   Force 

> 

/ 

/ 

J 

• 

r 

/ 

> 

f 

/ 

/ 

/ 

/ 

/ 

. 

/ 

/' 

• 

' 

^ 

• 

• 

** 

• 

• 

> 

• 

" 

-■ 

^ 

• 

^ 

— 

tn 


J. a  2.0  3.0  4.0  S.O  G.O 

SPEEC?-  fSEVCPL-UTIOMS   PEIZ   3ECOMC? 

(/r-.p.s.=  12. G<Z3  m.p.h.) 

5RE.ED    EFFBCT 

{IMCISE.ASB.     IhJ    ME/\M      STISE.SS) 


~ 

~ 

- 

A.I3.E../\.  Dsaiqr-i    Specificai 

ior-i 

and  eaHn,<3    I3i-ilhs       -\ 

"" 

r 

, 

• 

. 

• 

* 

• 

• 

^ 

• 

• 

. 

• 

, 

• 

* 

• 

• 

- 

, 

• 

_ 

_ 

p. 
hi 

UJ  (D 


/.O  2.0  3.0  4.0  5.0  G.O 

3Pe.E.C>-  ieE\yOLUTIOhJ3     PEI^.     SECOr^P' 
(lr:p.3.=   IZ.<Z<Z&  m.p.h.) 

I20L.L,     E.FFE.CZT 


FlQ.  31 
55'-IO     Q1F5DB1S     SP/^NI 

SPEED      EFFECrr 

AND 

(50U1_     EFFECT 


LOCOfVlO-riVE       CL/^SS       Ml-A 


Impact 


461 


and  the  recorded  stress  of  11.23  or  2.01  kips  per  sq.  in.  which  is  26.6  percent  of  the 
average  static  stress. 

The  effect  of  roll,  shown  in  percent  of  static  load,  is  given  for  both  spans  as  deter- 
mined from  stresses  in  Tables  11  to  18,  inclusive,  and  for  the  122-ft.  span,  as  deter- 
mined by  deflections,  in  Tables  27  to  30.  Roll  to  the  west  or  east  is  marked  "W"  or 
"E"  as  the  case  may  be.  The  preponderance  of  westerly  roll  was  probably  due  to  some 
track  condition  or  the  westerly  track  eccentricity  or  both. 


lA 
lA 


r 

^ 

1 

-T- 

.  _ 

T 

1 

I 

1 

i  Ti 

j     i 

1 

T 

1     1 

1 

j 

, 

"    "H 

1 

!    i 

! 

U-L4--I-- 

v-^-- 

X   -U 

I   1 

1 

1 

'   1   1 

' 

i 

t; 

11 

1 

\ 

1 

1 

i 

' 

^ 

■  • 

11      1  1  '      i 

' 

, 

ir-i   sfr-e 

73S     cJl-is    i-o     , 

e 

1 

'' 

'' 

' 

L.±«: 

1 

■ 

'  ' 

A 

-.\ 

T- 

X. 

1 

i-''"' 

1 

_i 

• 

1    . 

,--" 

'' 

-^ 

- 

4--' 
J- 

:::ll::::: 

o       10      zo     30     40      so     GO      70      ao     90      100     no 

Sf='EEn-  Mll-E.3     PEIZ     HOUfS. 

SPE.£C?    EFFECT 


"'^ 1 

T";^ T I '    T 

'                       f 

4-           ^..^.o--^                      -^ 

1      1    1               ^      1 

A  I5B./ 

1    Desiqr-i    5pedficctf!or-i        ^           ^ 

or-id   f- 

■Sa-hir-iq    ISlSIs3  -, 

:::..;;:__ :i.. ;:;;:.;:;_:. :.-.::i.:..i: 

T    T  • 

T       T                             X  "      •  -i- 

1 

1 

• 

I       11        1 

'      '      4-*X    X 

•    ^     1.  I 

X.   '' " 

.        '       '        ■ 

::::::::li:M::i:::::::::::::::::::::::::: 

r 


O        10      so     30     40      so     GO      70    ao      9o     100     no 
SPE-EO  -  hvllLaS    PEIS     MOUfS. 
IZOLL.     EFFBCl- 


FIQ.  32 
12a  -O     QlRPEFZ       SRANJ 

SPEED    EFFECT 
ROL.\_    EFFECT 


LOCOMOT-IV/E       CUASS       PS-A. 


462 


Impact 


This  roll,  in  percentage,  has  been  plotted  in  the  lower  diagrams  of  Figures  28  to  35. 
It  will  be  noted  that,  with  the  exception  of  the  PS-A  electric  locomotive  on  both  spans, 
the  values  are  well  below  those  provided  for  in  both  the  AREA  design  specification  and 
AREA  rating  rules  for  steel  bridges.  It  is  interesting  to  note  that  for  all  locomotives  on 
both  spans,  the  maximum  roll  does  not  occur  at  the  maximum  speed,  but  at  speeds  from 
70  to  80  m.p.h.  or  even  lower  with  the  class  Ml-A  engine,  and  at  speeds  of  less  than 
40  or  SO  m.p.h.  it  is  not  an  important  factor.  It  should  be  remembered  that  the  girders 
of  the  5S-ft.-10  in.  span  are  only  S  ft.  apart  and  this  accounts  for  the  much  greater 
effect  of  roll  in  this  span  than  in  the  122-ft.  span,  of  which  the  girders  are  8  ft.  apart. 


'A 

in 
>^ 

^^ 


• 

. 

'''    ^ 

im    sir- ess    o'l^<s     fc: 

'C3se 

• 

e     \ 

|r 

: ,'.: 

1 

7" 

,'-'• 

, 

1 

^ 

.--'   1 

''\. 

---'' 

'i   . 

. 

.- 

— 

""     .      J 

So     JO     40     ^o     GO     70      SO     90 
SPE.EO-MIL-E.S    PBI^     HOUfS. 
SPEED    EFFECT 

(ir-JCISE^SE    IM    rvlE^h^      ST/SE3S) 


"""-T 

"tt 

X                      4.                           -- 

,3  t            ::::::::::::::::::::::::::::::::::: 

A.R.E.^.Di3Si<gr-i    Spsc/Fica-l-ior-i     __ 

cimc^   /SaHr-ic:^    ISl-i/ss  -)                                    T 

;    "                   X  .:.;_.£.: ; ;_x i 

• 

1 

• 

. 

^                                                  ''               ' 

, 

• 

0  .±.-ll' •        • 1. ...I _L I.-L. 

/O       so       30       ^O       so      GO        70        so        90       100 

SP£E.C>  -  Mlt-E.5    PEIS     HOUS 

ROLL.    EFFECT 


Fiq.  33 
l22'-0    qiRDER    SRAM 

SPEED     EFFECT 
ANC 
ROLL.  EFFECT 

LOCOMOT-IVE        CLASS       <H<^-I 


Impact 


463 


Track  Effect — Electric  Locomotives 

In  impact  tests  made  heretofore,  steam  locomotives  with  unbalanced  weights  in  the 
driving  wheels  have  been  used  and  it  has  been  impossible  to  apportion  the  total  dynamic 
effect  of  such  engines  between  the  disturbing  force  set  up  by  the  revolving  overbalance 
in  the  counterweight  of  the  drivers  and  that  caused  by  track  or  wheel  irregularities.  Here, 
however,  the  use  of  electric  locomotives,  with  no  unbalanced  weights,  afforded  an  oppor- 
tunity to  determine  more  definitely  the  effect  of  track  irregularities  such  as  joints  and 
uneven  surfaces  and  wheel  irregularities  which  might  be  due  to  flat  spots,  eccentric  mount- 


*~ 

"^ 

~ 

n 

~^ 

n 

~ 

' 

- 

~ 

- 

r 

1 

1 

^ 

• 

.. 

• 

' 

5 

. 

• 

- 

THeor-efical    ir-ic/~<^ase 
ir-i    str-ess     cdcje     to 
Cemi-r-i-FL-iaal    For-cs     \ 

7 

^ 

J 

" 

, 

• 

^ 

* 

- 

"- 

*• 

" 

'' 

s. 

^ 

- 

r> 

J 

J 

_ 

J 

^ 

=  = 

- 

J 

— — 

"^ 

— 

J 

_, 

i.o  2.0         3.0         ^.o  3.0         a.o 

SREED  -  /3BV^C^i-UTlOhJ3   PEIS    SECOND 

(I  r-.p  s   -  l^.093  m.p.h.) 

SPEED     EFFEO-T 

(INCISEASE.      ir^     hyiE.^!^       STFSE.5S) 


1 

r 

! 

1  1 

- 

r 

1 

r"' 

1  1 

1 

A.fS.B   A.   Desigr-}    SpGCificai-ion 
Oi—icJ    ISci+ir->q     F^u^les    — , 

1 

r 

, 

. 

, 

^. 

- 

- 

-- 

. 

■ 

• 

, 

•^ 

. 

1 

. 

' 

' 

. 

• 

" 

1 

. 

1  • 

. 

1 

. 

. 

i 

• 

^ 

\~\-\-\     k 


lO  2  0  3.0  4.0  S.O  G.O 

SPE.E.O  -  i^svoL.uTiOhJS  pae.    SBCor-^cp 

(l/-.ps.~    l^.093    m.p.h) 

ROI.L.    EFFECT 


FIQ.  34 
122'- O     QlRDE-R      SRA,M 

SPEED      E.FFECX 
ROl-L-     EFFECT 


LOCOMOTIVE.        CL_/ASS     K4-S 


464 


Impact 


ing  or  an  out-of-round  perimeter.  Perfect  wheels  on  a  perfect  track  surface  could  be  con- 
sidered as  smoothly  rolling  loads,  and  yet  could  set  up  free  oscillations  in  the  span  if  the 
wheel  spacing  and  speed  were  such  that  the  time  of  application  of  the  successive  wheel 
loads  synchronized  with  the  natural  period  of  such  free  oscillations. 

Where  the  axle  spacing  is  not  uniform,  as  was  the  case  with  the  electric  locomotives 
used  in  these  tests,  the  time  of  the  application  of  the  successive  axle  loads  would  vary, 
getting  out  of  step  with  the  free  vibrations  and  causing  the  oscillations  to  decrease  in 
magnitude.  The  oscillograph  records,  a  sample  of  which  is  shown  in  Figures  25  and  27, 

o  ^ 
uj 

^:» 

'  >^ 

dj 

O  I  O  20  3.0  4.0  5.0  &.0  7.0 

■5PBED  -  R-^VOUUTIONS    PEie    SECONO 

(lr-.ps.=    IS.GGSm.p.h) 

SRELE-a    EFFEczrr 

30i    ■    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    I    \ZO 


' 

. 

' 

_j 

' 

, 

, 

' 

. 

. 

• 

. 

"t 

. 

. 

• 

• 

• 

^^^ 

' 

^^ 

«< 

^ 

r-i    SiriBSS     di-ie     fo 
Cer-i  ir-i  fL-ioal    For~ce  1 

s 

,_ 

oL-l- 

Mil  1^10.+++^ 

*^ 

._ 

_^ 

n 

- 

A.ie.E.A.   Disslc^n    Sp&cificafion 
and  /Saf/i-icg   fStjIes  ~) 

1 

r 

1 

- 

. 

• 

• 

, 

• 

• 

. 

• 

. 

. 

• 

. 

'- 

• 

. 

• 

±. 

• 

• 

(A 

Oaf 


S    Hi 

0 


/■O  20  3.0  ^.o  5.0  G.O  1 

3R£EO  -   f^BV^C^UUTI  OI\u'5     REIS     SECOhJC? 
(I  n.p.s.   =    J2.  GC33    m.ph.) 
f^OL.1-     EFFECT 


Fiq.  35 
12.2 -O      QIRPER      SR^M 

SPE.E.D       EFFECT 

/AND 

ROLL     EFFECT 

LOCOIVIOTlVE      CLASS     M I -A 


Impact 


465 


_^     __          -            ..-.._ _          -_       .(! 

/4.«S.E./^.   [Pesigi-i                                                                          / 

Specif^ico+ion      ~\                                                                     ' 

- '--::-:::: j---- 

/ 

_    -      _    _      _1-           ^      .         .      .    ..                                   6 

::::_.::::::::::::::::::::::  ::"::;:::::^ — < 

.___                 T    .'      .    / 

•.    J  *                     •      •    /    . 

-——-^                      y 

--     --,£        -       -  ,        --- 

:::::: JLi:::::?:::::::::::::: — ;' 

. / 



,' 

..>,.. ..::::: .^' _. 

..: t: 

^-'    ■^-/A.^E.XV.   ISoi-!r-iq 

,''              Kulss 

,-'' 

, °        X 

UJ  ^ 
[J)  lr> 


O         lO       so      30      40       So     &0      TO      ao      90      100     no 

3PE-^D-  rvllLES    PEI^    HOUfS, 

TRACK    E-FFECT 

(AVBie/^QE.     OF    £^ST  .ANO     WEST    C^tl^DE-fSS) 


piq.  3G 
55-10   (^iiepEis.    SRAM 


TRACK    EFFECX 
LOCOMOTIVE.     Cl_A5S     P5-A 


'-^ T 

T 

A.e.B.A.    DESiqt^ 

^             SPEC/F/CATIO/^     \ 

^::::::::::::::::::::j::::::::::::::::::::::;  :::::::::: 

---------------               ::::::::::  :;j' 

,?.. 

::::::::::::::::::::::::                  :;;?!:::::: 

? 

::::::::::::::::::::::::::::;::::          :?':::::•:: 

__                .._.    y  --^-     - 

. -  ' :. 

: .=: 

3 ...'. i: 

-f' 

■   ■                                       ,-'    \A.S?.H,/A.   fSy^Tlh^G 

,-'               /SUi~ES. 

_.,--' 

,, "' 

0  c 

BE 


IS    J  J 


1^ 


J 


r 


10         20        30       40         50       GO        70       so        90        IOC 
3PEE.D-MII-E.3   PBfZ    HGUfZ 
TIS/\CK     EFFECT 

(/^VBf5/\qE.     OF    BAST  AND     IVBST     qnSDEISS) 


Fiq.37 
55-10      qifSDE-fig.       SRANJ 

TRACK     E.FFECT 

LOCOIVIOTIV'E.      CLASS    QC^-I 


466 


Impact 


20       30       4a        SO       GO        70       SO        90        100 
5PEE.D  -  MIL.E.5     F>EI^      HOU!^ 
TiaACK    EFFE-CT 

(/\VBIS/\QE.      OF     £.^ST  y^hJO      WEST    Q I IS.ae.fZS) 


laa'-o    (:qiRDBve.    sram 

TRACK    EFfE-CT 

locomotive:     ol-ass     p5-a 


g^l  1 1 1 1 1 1 1 1 1 1 1 1 1  1 1 1 1 1 1  1 1 1 1 1  - 

r" " 

A.e.B./h    Desiqm    Sped 

'^/coHon  - 1 

IS 

/ 

A 

./S.B.^.    fectHr-}c3                   / 

-       -       -       "                     '            Fk 

'1^1  es                           X         ,/ 

<y-.-... 

_,<•■' 

'^ 

; -: ....... 

::::;.::_,_-.-:..-•- 

^^  ' 

• 

J-'''* 

•      ^       ^ 



IP 


o       10      za     30     40     30    GO     70     ao     90     100     110 

(AV£>S^QE.      OF     B..^ST-    ^r^C      i^£.ST       C^/fSa^fSS) 


Fi(5-   39 

122-0       CqlieCPEfS 


TRACK      EFFECT 


LOCOMOTIVE.       CLASS     qq-l 


Impact 467 

could  be  interpreted  as  indicating  this  very  condition,  but  on  the  other  hand,  the  de- 
parture from  the  smooth  mean  stress  curve  might  be  considered  as  due  to  the  successive 
wheels  passing  over  a  joint  or  irregularity  in  rail  surface  due  to  uneven  tie  support. 
Regardless  of  the  cause,  these  electric  locomotives  produced  dynamic  forces,  and  until 
more  is  known  about  them,  they  must  be  ascribed  in  this  report  to  a  track  or  wheel 
condition  or  both  and  given  the  term  "track  effect". 

This  track  effect,  both  in  magnitude  of  stress  and  percentage  of  the  mean  static 
stress  is  given  in  columns  14  and  IS  of  Tables  11  and  12  for  the  SS-ft.  10-in.  span,  and 
in  Tables  IS  and  16  for  the  122-ft.  span.  This  same  information,  as  obtained  from  de- 
flections, is  given  for  the  east  girder  of  the  short  span  in  Tables  23  and  24,  and  for  both 
girders  of  the  long  span  in  Tables  27  and  28. 

The  various  values  of  this  track  effect,  in  percentage  of  the  mean  static  stress  as 
found  from  the  tests,  have  been  plotted  in  Figures  36  to  39.  It  will  be  seen  that  the 
measured  values  are  considerably  lower  than  those  provided  for  in  the  AREA  design 
specification,  but  at  lower  speeds  exceed  the  amount  provided  for  in  the  AREA  rating 
rules.  There  seems  to  be  but  a  very  small  increase  in  the  SS-ft.  10-in.  span  after  a 
speed  of  SO  or  60  m.p.h.  is  attained,  and  with  the  P5-A  locomotive  on  the  122-ft.  span, 
the  maximum  effect  occurred  at  a  speed  of  about  20  m.p.h. 

As  was  to  be  expected,  the  effect  was  greater  on  the  short  span,  amounting  to  from 
12  to  IS  percent,  while  on  the  122-ft.  girder  it  was  slightly  more  than  5  percent  for  the 
GG-1  locomotive  and  9  percent  for  the  PS-A.  It  is  hoped  that  at  some  future  time 
tests  can  be  made  with  similar  locomotives  on  spans  on  which  the  rail  is  continuous  or 
in  which  the  joints  are  welded,  to  determine  more  conclusively  whether  these  oscilla- 
tions are  natural  vibrations  set  up  by  the  rolling  load  or  are  simply  an  increase  in  stress 
due  to  the  track  condition. 

Combined  Track  and  Hammer  Blow  Effect — Steam  Locomotives 

An  important  source  of  vertical  oscillations  in  a  railroad  bridge  is  the  periodic  dis- 
turbing force  of  the  counterweights  of  the  steam  locomotive.  This  disturbing  force,  or 
hammer  blow,  is  due  to  the  centrifugal  force  of  the  unbalanced  weights  on  the  revolving 
driving  wheels.  In  these  tests,  as  well  as  in  the  impact  tests  reported  in  the  AREA 
Proceedings  for  1936,  Vol.  37,  the  recorded  dynamic  effects  are  due  to  both  track  effect 
and  hammer  blow  effect.  It  is  quite  possible  that  in  some  cases  the  condition  of  the 
track  would  tend  to  counteract  the  oscillations  due  to  the  hammer  blow.  On  the  other 
hand,  the  oscillations  due  to  the  track  conditions  might  be  additive  to  the  oscillations 
caused  by  the  hammer  blow.  Since  for  these  tests,  there  is  no  way  to  determine  the 
separate  effects,  the  only  alternative  is  to  report  their  combined  effect. 

The  combined  track  and  hammer  blow  stresses  and  the  dynamic  magnifiers  for  the 
east  girder,  west  girder  and  average  of  both  girders  are  shown  under  the  heading  of 
Semi-Amplitudes  in  Tables  13,  14,  17  and  18  for  the  two  steam  locomotives  on  both 
the  SS-ft.  10-in.  girder  span  and  the  122-ft.  girder  span.  The  deflections  and  dynamic 
magnifiers  for  the  east  girder  of  the  SS-ft.  10-in.  span  are  shown  for  the  electrical  de- 
flectometer,  the  mechanical  deflectometer  and  the  average  of  the  two  instruments  in 
Tables  2S  and  26.  The  deflections  and  dynamic  magnifiers  for  the  east  girder,  west 
girder,  and  average  of  both  girders  are  shown  in  Tables  29  and  30  for  the  122-ft.  span. 
The  theory  of  vibrations  as  pertaining  to  impact  in  railway  bridges  has  been  fully 
discussed  in  the  AREA  Proceedings  for  1936,  Vol.  37,  page  761,  and  this  theory  has  been 
followed  in  determining  the  dynamic  magnifiers  for  the  steam  locomotives  on  these  two 
test  spans.  The  method  used  in   determining  the  dynamic  magnifiers  will  now   be  ex- 


468 Impact 

plained,  using  the  steam  locomotive  Class  K4-S  on  the  5S-ft.  10-in.  span  as  a  typical 
example.  According  to  Table  13,  columns  14  to  22,  inclusive,  the  semi-amphtude  stress 
for  run  205  at  a  speed  of  89.4  m.p.h.  is  2.87  kips  per  sq.  in.  for  the  west  girder;  see 
column  17.  The  values  of  DnN^  in  column  18  are  the  stress  semi-amplitudes  due  to  the 
hammer  blow  forces  when  considered  as  acting  statically,  that  is  without  magnification, 
on  the  span  in  the  position  for  maximum  moment.  The  theoretical  hammer  blow  stress 
at  one  revolution  per  second  in  the  west  girder  is  O.OSS  kips  per  sq.  in.  and  by  correcting 
this  theoretical  stress  by  the  stress  factor  of  0.979,  as  found  in  note  (d)  at  the  bottom 
of  Table  14,  the  actual  hammer  blow  stress  at  one  r.p.s.  is  0.054  as  shown  in  note  (e). 
Table  14.  For  run  205,  the  speed  of  the  locomotive  drivers  "iV"  was  6.33  r.p.s.  The 
value  of  DiiN^  for  this  run  therefore  becomes  equal  to  0.054  X  6.33^  =  2.16  kips  per  sq. 
in.  The  dynamic  magnifier,  or  the  ratio  of  the  measured  semi-amplitudes  to  the  stress  in 
the  span  due  to  the  hammer  blow  when  considered  as  acting  statically  at  the  center,  is 
then  equal  to  2.87  -^  2.16  =  1.33. 

It  should  be  pointed  out  that  the  static  or  unmagnified  hammer  blow  stresses  and 
deflections,  or  DnN~,  are  computed  for  the  hammer  blow  as  found  by  the  dynamic 
method  of  analysis,  whereas  the  hammer  blow  deflections  as  reported  in  the  impact  tests 
in  the  AREA  Proceedings,  Vol.  37,  are  based  upon  the  static  method  of  analysis.  The 
difference  in  the  hammer  blow  stresses  or  deflections  resulting  from  the  two  methods  of 
computing  the  hammer  blow,  as  shown  in  Figures  18  and  19,  is  very  small  for  these  two 
locomotives.  Since  certain  refinements  had  been  made  in  the  dynamic  method  of  analysis, 
it  was  felt  that  the  hammer  blow  as  computed  by  the  dynamic  method  of  analysis 
should  be  used  in  analyzing  these  data  as  well  as  all  future  data. 

The  average  semi-amphtudes  and  dynamic  magnifiers,  as  found  for  the  two  loco- 
motives on  each  span,  have  been  plotted  and  are  shown  in  Figures  40  to  43.  The  theo- 
retical values  which  might  be  expected  and  which  are  based  on  damping  factors  as 
recommended  in  the  AREA  Rating  Rules  for  Steel  Bridges,  are  expressed  by  the  curves. 
It  will  be  seen  that  for  the  55-ft.  10-in.  span  the  actual  values,  in  the  range  of  critical 
or  synchronous  speed,  are  well  below  the  theoretical.  At  other  speeds,  while  the  actual 
values  somewhat  exceed  the  theoretical  values,  the  difference  is  not  serious  and  it  must 
be  remembered  that  some  portion  of  these  semi-amplitudes  represent  track  effect. 

For  the  122-ft.  span,  the  measured  values,  are  well  below  the  theoretical  values.  It  is 
quite  evident  that  the  damping  quahties  of  the  span  were  greater  than  that  assumed  in 
the  rating  rules  for  a  span  of  similar  length.  It  would  also  seem  that  locomotive  spring 
friction  had  been  overcome,  and  that  additional  damping  was  contributed  from  this  ac- 
tion. There  is  also  shown  a  theoretical  value  of  the  oscillations  and  magnifiers,  based  on 
the  assumption  that  spring  damping  was  present,  and  the  agreement  is  about  as  close 
as  can  be  expected,  in  view  of  the  large  number  of  unknown  factors  entering  into  the 
problem. 

Total  Impacts 

The  total  impact  stresses  and  percentages  shown  under  the  heading  of  "Maximum 
Stresses"  in  the  Tables  11  to  18,  inclusive,  and  the  total  impact  deflections  and  per- 
centages in  the  Tables  23  to  30,  inclusive,  are  the  maximum  increases  in  stresses  or 
deflections,  for  that  particular  run,  over  the  stresses  or  deflections  obtained  at  a  speed  of 
approximately  5  m.p.h.  or  the  measured  static  stresses  or  deflections.  These  total  impacts 
as  given  are  the  combination  of  (1)  speed  effect,  (2)  roll  effect,  (3)  track  effect  for  the 
electric  locomotives  and  (4)  track  and  hammer  blow  effect  for  the  steam  locomotives,  as 
found  for  that  particular  run,  although  it  would  be  only  by  chance  that  the  maximum 
for  all  effects  would  occur  simultaneously. 


Impact 


469 


The  total  maximum  impacts,  in  percentage  of  the  crawl  stress,  for  the  four  loco- 
motives on  the  55-ft.  10-in.  span  have  been  plotted  in  Figures  44  to  47  and  in  Figures 
48  to  51  on  the  122-ft.  span.  These  diagrams  show  the  amount  of  impact  fixed  by  the 
AREA  design  specification  and  the  AREA  rating  rules  for  steel  bridges  for  the  particular 
locomotives  and  spans  used  in  these  tests. 

It  will  be  seen  that  for  the  PS-A  locomotive  on  the  short  span.  Fig.  44,  both  the 
design  and  rating  impacts  are  exceeded,  and  with  this  same  locomotive  on  the  long  span, 
the  impact  percentages  as  found  are  below  those  provided  for  in  the  design  specifica- 
tions, but  exceed,  by  a  small  amount,  the  rating  impacts  as  shown  in  Fig.  48.  The  GG-1 


4.00 


/.oo 


" 

' 

" 

~ 

.— 

■" 

- 

~ 

-p 

"■ 

_  — 

■" 

T" 

~^ 

j 

1 

\ 

■ 

THEORE.riC/^L.  CURVE 
/e>ased  on    A.f^EA) 

\ 

1 

\ 

r 

> 

\ 

/ 

A                    ^                 -         *                 .11                 f         . 

\ 

r 

X=r~a      ^ 

^ 

-^ 

^ 

— 

\ 

_ 

■^H 

_ 

15%  spri^q    fr~ia 

j-iorn 

V 

— 

- 

-^ 

— 

V 

r 

- 

— 

^ 

»^ 

~ 

• 

\ 

r 

__ 

. 

- 

/ 

t 

' 

• 

• 

, 

y 

• 

. 

/ 

\ 

■ 

t 

^ 

« 

t 

' 

y 

% 

p 

/ 

- 

- 

- 

-^ 

•- 

-^ 

-i 

- 

L. 

/ 

« 

— 

- 

_ 

_ 

-. 

_ 

_ 

_ 

_ 

_ 

- 

~ 

~ 

~ 

- 

h- 

/ 

''\ 

— 

- 

- 

- 

— 

— 

-"' 

- 

- 

— 

/ 

y 

±                              -P^rrA 

^ 

■"Y      —  /  '     *=  — ;_-■      ,    ^    <  ., 

_ 

L_ 

„ 

_ 

_ 

A 

^ 

^ 

_ 

_ 

^ 

_ 

_ 

at    cren/t. 

r,r,cj         1 

- 

'2 

t 

t 

^ 

^ 

Si 

^ 

= 

- 

" 

t 

- 

^H-ffH-f+44T 

H 

n 

R 

F^ 

4.00 


u^r 


h      (T) 


1.0  20  3.0  4.0  3.0  (Z.O 

3PB£C  ~  R.BVOUUTIOr\l3    RBfe    SBCONC 
(I  i~.  p.S.  =  14.033  m.p.h.) 


■V  "• 

- 

'■ 

— 

^ 

- 

- 

• 

THEORETIC-^L  CUR^E. 
(BasecJ   am   ^.R.E  A] 

— 

_ 

L 

_ 

_ 

—* 

_ 

_ 

^ 

_ 

_ 

3.0 

— 

- 

- 

— 

— 

-■ 

- 

- 

-• 

- 

- 

— 

~ 

— 

171 

r— 

r- 

r— 

r~ 

1 — 

p 

, 

•1 

x^ 

/ 

I 

\ 

- 

- 

/ 

> 

, 

1 

■ 

/ 

f 

\ 

• 

> 

/ 

I 

2.0 

\ 

/ 

> 

' 

\ 

/ 

■ 

/ 

• 

!w 

/* 

^ 

'* 

, 

4 

» 

s 

\ 

_ 

_ 

__ 

_, 

L. 

_ 

— i— 

L. 

I 

u 

_ 

„ 

_ 

^ 

„ 

_< 

!l 

_ 

_ 

1.0 

— 

— 

-' 

— 

- 

— |— 

— 

-J 

- 

- 

— 

-V 

- 

- 

- 

s 

— 

1 

s 

, 

- 

- 

- 

- 

- 

- 

- 

- 

- 

0 

_ 

_ 



_ 

_ 

_ 

^ 

^ 

_ 

_ 

_ 

. 

4.0 


UJ  k 
^  Uj  jj 


5:U 


.^ ,  i^^ 


(^  in 


O  1.0  2.0         3.0         4.0  3.0         eo  70 

SPEBD-  RE\^aL^UTIOt\l5     PBie    SECONCP 
(I  i~.p3.  =  14.  a93  mph.) 

ARE.  A    RATl^q   RUL.E.S    DATA  55'-IO    qiRDER     5RAM 

n=  <^.(?<S     Vibr-ahoi-is psr~  sscor-td  

^l^:%^4l  TRACK    ANP 

HAMMER      Dl_OW     EFf='ECT 


LOcoMoTiv/e    ci_ASS    K4-5 


470 


Impact 


electric  locomotive  produced  impacts  on  the  short  span  well  below  the  design  allow- 
ances but  are  somewhat  higher  than  those  fixed  by  the  rating  rules,  as  shown  in  Fig.  45, 
while  on  the  long  span  the  impacts  as  measured  were  well  within  the  requirements  fixed 
by  either  design  or  rating  rules;  see  Fig.  49.  The  total  impact  produced  by  the  steam 
locomotives  on  both  spans  was  less  than  that  called  for  by  either  the  design  or  rating 
rules  (Figs.  46,  47,  50  and  51). 

The  excess  in  any  case  can  be  ascribed  to  the  speed  effect  which  is  not  now  pro- 
vided for  in  the  specifications  for  design  or  the  rating  rules.  It  will  also  be  found  that, 


^  -  oo 


^  "" 

■ 

~ 

^ 

" 

T 

' 

1  1  1  M  r  T  ■ 

L 

■'fT    T' 

I 

\ 

E 

IBaasd  on  A  R  £.-A) 
\feafir-iq    f?i^les       / 

' 

\ 

1 

■> 

\ 

\ 

- 

r- 

J 

\ 

\ 

^ 

/ 

\ 

/ 

' 

\ 

- 

> 

\ 

^ 

i 

15  ^    Spr.'riQ    fn.cHom 

1 

\ 

f 

k 

• 

^ 

/ 

/ 

/ 

' 

/ 

/ 

/ 

. 

/ 

■ 

/ 

( 

• 

> 

f 

• 

/■ 

1 

» 

' 

y 

* 

, 

/ 

.' 

• 

'^ 

• 

M 

' 

■■ 

^ 

^Dh^^=  5i-c»i'G     sir-GSS    ffomX 

^ 

J 

L— 

Oii 

^ 

^ 

-^ 

L. 

_\ 

^_ 

__ 

1    '    1     1    1    1    1    1    1    1    I'l    1    1    1    1     1    1    1 

4.00 


„  "J  3 
7  f  0 

L     ^    - 


1.0  2.0  3.0         ^o         5.0         a.o 

(ir-.p.s.   =    12.  <Z<Z3  rn.p.h.) 


40 


^ 

- 

'■ 

■* 

■ 

- 

THEORBTiCy^L.    CURVE. 
(QasecJ  <=>r-r   A  fe.E  A.) 

' 

t 

- 

/ 

\ 

i 

\ 

- 

1 

\ 

/ 

\ 

J 

, 

• 

r 

i 

, 

r 

• 

-■ 

k 

t- 

/ 

/ 

* 

V 

X 

" 

^ 

■ 

• 

\ 

' 

• 

s 

J 

« 

V 

,, 

V 

* 

• 

,^ 

■N 

0    "^ 


O  10  2.0  3.0  4.0  3.0  G.O  7.0 

SPEBC>  -   ISEV^l-UTIOI\/5     PBI^      5E.CZON[P 
(/ r~.ps     =     tZ.GG'B   m.p.h.) 

n=',4.40    \yibr-ai-ioin3  par-   secorid        55  -lO    GIRDER      SP/\M 


03: 

337 


TRACK    AND 
HAMMER    BLOW     EFFECTS 


LOCOMOTIVE      Cl_/^SS     tvll-A 


Impact 


471 


in  most  instances,  the  excess  occurred  in  the  west  girder,  which,  as  has  been  pointed  out, 
was  more  heavily  loaded  due  to  track  eccentricity,  and  this  would  tend  to  increase  the 
roll  in  that  direction  and  consequently  increase  the  total  impact  in  that  girder. 

Lateral  Forces 

Little  has  been  known  as  to  the  magnitude  of  the  lateral  forces  acting  on  bridge 
spans  but  in  these  tests,  lateral  deflections  were  measured  from  which  it  was  hoped  that 
some  idea  as  to  such  forces  might  be  obtained. 


r 

n 

~i 

Theor^Haal  Semi- 

Amplit-L. 

-3 

« 

\ 

( overcome                     / 

' 

\ 

y 

- 

\ 

I.  so 

\ 

Any  Serni- 
Amplituicfs  £3bo\>e 
4-H!s    line  yvoulcJ 

Spning   -Frier ion  ' 

\ 

T/Teot-eHcai  5emi-/4mpli-iudes 
pO'/o  5pi~ing    fnich'on ) 

\ 

\ 

f 

v 

\ 

y' 

I.OO 

f 

N 

s 

\ 

\ 

i 

N 

\ 

,A 

>i 

.- 

- 

^ 

1 

^ 

i^ 

Apparent-  Semi-AmpliiutJe^ 

\ 

/ 

\ 

/ 

i 

■> 

K 

f 

V 

% 

y 

* 

\ 

N 

I 

• 

^ 

^ 

^ 

.' 

p 

V 

' 

>■ 

f 

■ 

< 

~~" 

-1 

-1 

- 

■' 

/ 

' 

~ 

,, 

y 

^ 

- 

-i 

_aHM^=  S+ai-ic    Sfr-GSS~'~~ 

- 

o 

■  - 

^ 

e; 

c 

JC 

-/ 

'n 

3. 

z>i 

c 

c 

er 

-77 

'« 

^ 

r 

^ 

a. 

2. 

^  I.OO 


I.O  2.0         3.0         4.0  s.o  £.0 

SPE.BC)  -  l3E.^ai-UTlOt\/5    P>EJ5    SBCOhJC 
(ir~.p.s,.=  /i:j..o93  m.p.ti.) 


4.0 


JhGone-i' 

■ 

'  ' 

■■ 

"■ 

■^ 

- 

■" 

■^ 

/Spnir-ie^    fniciion ) 
Knot  ox^&nconnG    J 

■^ 

/' 

» 

1 

1 

I 

1 

I 

\ 

' 

- 

V 

-J 

Theorei-ical  Dynamic 

Magni  Fi er:9 

(lO^  3pnin<3  Fricfiort) 

V 

- 

1 

\ 

» 

' 

, 

/ 

• 

\ 

• 

V 

/ 

V 

s 

s 

/ 

■ 

/ 

' 

>•■ 

^ 

-^ 

' 

^^ 

\ 

^ 

«. 

> 

; 

■ 

■" 

-» 

~2 

\i 

Tj 

~l 

> 

■ 

*«« 

^  — 

«J 

i. 

_ 

_ 

. 

^ 

^ 

». 

^ 

_ 

^ 

_ 

_ 

_J 

_ 

_ 

7.0 


4.0 


7.0 


O  1.0  Z.o  3.0  ^.o  5.0  6.0 

SPE.E.c:>-i^a\yc?i-UTioMS  pais  secomc 

(I  r-.p.s.  -  1^.  093  m.p.H) 

A  B  E..A.  IS/^TiM<^   ieut-B3    OATy^  122  -O     C^lRCPER      SP/AtSj 

n=  3.  Sd.     V^ib.  psr-     Sac  — ^^^-^ 

ri,=  4.3S  \'ib.  par  3<3c 
f^  =  ^.iO  i/,b.  per-  Sac 
p  =  O.  OZ 1 1         ' 


TRACK  /Afs»0 
HAMMER     BLOW   ErPECTa 


LOCOMOTIVE     CLASS      K4-S 


472 


Impact 


These  deflections,  as  measured  at  the  bottom  flange,  are  given  in  Tables  31  to  38. 
While  the  deflections  are  generally  found  to  increase  with  speed  up  to  a  certain  point, 
the  maximum  does  not  occur  at  the  highest  speed,  and  even  at  low  speeds  they  are  in 
some  instances  quite  high.  Neither  does  the  position  of  the  locomotive  on  the  span,  at 
the  time  of  maximum  deflection,  seem  to  be  a  controlling  factor  as  shown  by  the  distances 
"Z"  in  these  tables.  (Text  continued  on  page  482) 


" 

~ 

~ 

1 

r 

— 

~ 

~ 

"■ 

~ 

1    1    1    I    I    1    1    1    1    1    1    1    1    1    1    1    1 

~ 

~ 

TheoreHcal  Seml-Ampliiudaa 
fSpring    frlcrior)   nor) 

- 

- 

\ 

' 

1 

\ 

\ 

\ 

1 

1 

1 

Ar-iLj    Sem!- 
Amplifuds  aboy'e 
^his   line  ^ould . 
o\/encon-ie    IO% 
Spr-ing    fi~iciion 

I 

Theor~e-l-i'cal  5er-ni- 

Amplii-LJCiGa 

flO%  Spninq    frlcTion) 

'■ 

\ 

1 

\ 

' 

,\ 

' 

\ 

,' 

/ 

\ 

l' 

7 

\ 

y 

^ 

Si 

- 

__ 

\ 

^ 

Appcar-prTf    Semi- 
ArhplitLJc/es          \,  , 

y 

1 

S 

> 

\ 

N 

J 

*! 

>• 

^ 

Js 

s 

>-< 

-> 

~~ 

\ 

r 

• 

^ 

5< 

^ 

»- 

Sj 

' 

— 

— 

_ 

_ 

• 

/ 

, 

< 

'. 

~^ 

" 

"1 

~J 

~ 

— 

_ 

_ 

/ 

,- 

'DnM^=Sia-f-'C  ~S^r-<sss_ 

, 

^ 

, 

' 

' 

-- 

- 

- 

_ 

. 

.. 

■9 

V4 

B* 

' 

-i 

, 

_ 

a 

c 

r^> 

/-! 

3L 

c 

j/ 

<: 

-€ 

?/- 

7/ 

e 

^ 

o 

F 

Spar 

-> 

\ 
I'" 

\ 


I.O  2.0  3.0  ^.O  5.0  &.0 

3P£BC>  -  fSE^^OL-UTIOI\/S   PE^  SBCONiy 
(I  r-.p  S.  =  12.  GG8  m.p.h) 


7.0 


" 

~ 

— 

~ 

" 

- 

- 

~ 

~ 

~ 

1  1  1  1 J  1  1  1  1  1  1  1  [  1  1  1  1 

Theor-e^i'cal  Dc/narrrc  Maqn,Fiers 
i[5pring    fniaflon    noi ) 

- 

v 

— 

~f 

^ 

1 

-" 

I 

^ 

• 

1 

f 

\ 

\ 

V 

• 

•i' 

/ 

i 

\ 

1 

^ 

\ 

\ 

, 

V 

, 

^ 

, 

, 

_ 

-~ 

_ 

_ 

_ 

_ 

- 

_ 

-r 

J 

=^ 

2 

^ 

^ 

— 

— 

— 

— 

~ 

- 

- 

— 

"^ 

l~- 

— 

-- 

— 

— 

— 

-- 

^ 

s 

_ 

, 

_- 

— 

_ 



__ 

_ 

_ 

\ 


o 


S.O  3.0  ^.O  5.0  a.O  7-0 

(  I   r-.  p  s    =    IS.(ZG<3  rn p.h) 

Fiq   43 

laa'-O      (3lRC?ELR      SRAM 
3.  Z3    v^it).  per-    sec  ^ 

""    ^'bfper-   %%%  TRACK    ANP 

02II         ^  HAMMER     Bl_OW    E.FFE.CT 


I.O 

SP'BE.C)- 


A.I3.E  A      ISATihjq    fSUl-E5     O.^TA 


r-!i=  3    73 

f  =  ^ .  5/    ^it>.  per-    sec: 


LOCOMOTIVE      CL./ASS     tvll-A 


Impact 


473 


(IS  $>  6/    Si-Ji-J-ir-i/cicy    '3/    s>/<9eii.     3>.=3S-  ) 


"1 

" 

—ri 

1 

A 

1 

, 



1 

-U 

— 

~ 

— 

— 

—   ' 

-3 

-^ 

— 

-^ 

— 

— 

— 

■ — ' 

-^ 

— 

' — 

\ 

\ 

1 

, 



- 



- — U 

_ 

„ 

- 





— 

— 

— 

—   - 

—-\ 

V 

_ 

— 

— 

— 

t— 

H — i— 

— 

1      1 

1 

1   '      ' 

- 

- 

^ 

-■ 

■-- 

- 

- 

^ 

- 

= 

-«- 

-- 

z 

O- 

- 

- 

=t 

— 

;:; 

t= 

3 

z: 

5^ 

~ 

~ 

^ 

Z 

p- 

( 

- 

].-• 

- 

~ 



1 

, 1 

Ji 

_: 

1^   « 



uJo_ 

, 



— 

r— 

^- 

—  • 

■^ 

— 

— 

— 

' — 

— 

1— 

h— 

— 

-9 

— 1 

h-H 

— 

1 

, 

_ 

- 

, 

- 

_ 

, 



— 

— 

— 

—  - 

^ 

— 

—^ 

-^ 

' — 

— 

— 

— j — 

— 

Mi 

< 

uj 
< 
U 

-J 

0 

0  : 
k.'- 

,-; 

- 

- 

- 

_ 

_ 

_. 

._ 

, 

1 

_j 

_ 

A.  _ 

_  __ 

„ 

_ 

_ 

_ 



— 

— 

-'- 

— 

— 

— 

,',/ 

^- 

_u_ 

— 

— 

— 

— 

— 

"JT 

u 

- 

r 

- 

:~ 

- 

~ 

z 

0 

J 

2 
9 

-- 

:z 

z 

Z 

^ 

51 

z 

z 

=J 

= 

^ 

- 

lU  J 
CL- 

2" 

- 

— 

E 

=  ' 

:  = 

= 

= 

= 

- 

- 

1^ 

Rttv 

, 



, 

, 

, 

_ 

1 

I  _ 

_ 

„ 

_ 

_ 



~ 

~ 

z 

~ 

Z  — 

z^ 

Sj 

z 

in: 

_  „ 

z 

z 

~ 

^ 

- 

— 

— 

— 

IT)  - 

— 

— 

1 — 

— 

— 

— 

<r- 

— 

1— 

KUL 

_ 

_ 

_ 

1    1 

, 

1  1 

u 
5 


Z 

i 

I!) 

■q-uJ 
■D 


O    X 


J 
< 
0 


5     7 

UJ     ^ 


2 

0 

0   in 

U     uJ 
Q 


Q  Q  0  Q 


Ci 


' 

^  J 

_. 

, 

1 

, 

_ 



— 

— 

— 

— 

— 



— 

— 

— 

— 

— 

— 

—^ 

— 

^ 

V 

\ 

K 

\ 

uiC 
'  u 

c 

•+1(1 

I 

^> 

\ 

' 

'  \ 

z 

z 

z 

z 

- 

1 

z 

— ^ 

~z 

X. 

Z 

z 

z 

=1 

z 

- 

z 

z 

r 

z: 

V' 
Jo 

z 

~ 

n 

\l 

E 

z 

~ 

- 

z 

- 

_ 

~ 

_ 

_ 

z: 

;z 

_ 

_ 

_ 



X 

_ 

_ 

— 

_ 

^ 

— 

— ' 

— 

^ 

- 

— 

— 

— 

-**  r 



— 

— 

— 

— 

— 

^ 

- 

- 

- 

~ 

— 

-- 

- 

- 

~ 

-J 

- 

- 

- 

- 

-^ 

- 

— 

- 

- 

- 

—  ■ 

r- 

— 

- 

J 

-- 

n. 

- 

-S 

- 

- 

z: 

1 



1 



- 

1 

^ 

— 

— 

— 

' — 

|— 

-^ 

— 

— 



— 

— 

TT 

r 

_ 

__ 

1 

1 

_. 

1 

1 

_ 

II  II 


2 
in 

iu 

u-5- 

0 

r 
10 


UJ 


J 
u     ^ 

■^  t  7 

0     Q: 

Q 

2 


UJ 
> 

Z    0 
^   o 


474 


Impact 


1 

-      '-                 ^^            r 

7 

1                     z":::::i"^:::::::: 

±7         —^'^                   _  + 

r/ ::._:  £ ^_„_ 

""    c*        "            -  i^i , .-— 

c                             JALT           5      ^  --    -- 

o_ _,2           .   __.       x_.   ° 

<                               ^T  ■  -J-                                  

'-    0"              •'  X-^    -  s I 

'     .0 "  """j^"X"t                     "■    -  '- 

^                                          ^>   1     1                    _        <        4                           a^ 

0                                        r'^J            ^                 *•                             °       , 

% ;0^^>     7           ,        <       o             T 

,%                    t         ">»       "^  ::  (.?''x>"'ic5 

->^"    :  stii— --v--^ ^'- 

H                                ^                           \      -    -      !!-,    5^^° 

""  o> .^::  :__: ^^ !.._:"._ 

D(ii                          li;   T _S - 

r'^                               ^4-                             <               <           o 

"  tS                    cr                    _\ _._ 

"^         "               T,C                                 ^         >     _      " 

^^     "                        0;^                                      r 

._jj       ..   .        „     ^.    .,,   -,<^--- 

""■^[li lU^'i""   "   r" 

-K:               p:::"::::::^_:.::_;  :.__j^ 

^\                i 

::  ::::::::::  ::"-'^::  :::::::  :::::::::::  IlI  ii^. 

Qw 

"^ti>                                       I             =  IE 

lO^ __     ___ 

::::::  :::::::::::ii:::::::::::::::::::: ::::::_... 

1 

■^    (J 


2 

i 

'tuJ 
•D 

0 


UjUl 

mm 

t  UJ 


^    ^   5 


2 
0 

in 

u  2  -• 

Q 


<0 

!" 

h 

h 

2 

5 

0 

1 

in 

Y 

i 

J 

(0 

Ml 

in 

ID 

-1 

J 

m 

1- 

■J 

< 

^.IIV 

0 

(V 

J 

.  D 

U 

1H7 

7 

^ 

UJ 

o 

fY 

> 

0 

(fi 

n 

H 

1 

fy 

7 

u 

10 

< 

< 

i 

ir> 

11. 

0 

^ 

Z 

I) 

o 

U) 

0 

U 

in 
III 

_l 

WIV 

Q 

U  HJ 

lmS 

!^(i) 

lo-ia- 

t^k 

X.  uj 

UJ^ 

o    X 

J 

0 

Impact 


475 


P     - 


1  er 


{  IS  S  61    SLJUuniozy  'si  &I<=J>^J. 

Q  0  0  Q 

I  ^^  ^  w  - 


476 


Impact 


^      i     < 


Qo 


1 

1 

- 

A 

t^  0  - 

— 

J- 

"• 

-f  't 

^ 

/ 

__ 

/ 

" 

0 

i 

> 

X 

> 

, 

/ 

> 

0 

a'n 

^ 

J 

r-' 

U 

I 

> 

4c- 

_ 

^.i. 

- 

L_ 

- 

~ 

X 

o 

0 

S- 

s 

X 

o 

0 

/ 

ii 

- 

M;4( 

\ 

/< 

/' 

o 

|9 

r. 

U 

*■, 

< 

ii|^ 

•% 

1 

" 

o 

- 

- 

~ 

:;;;; 

X 

<»« 

o 

^ 

^ 

k: 

~. 

s 

X 

o 

s 

- 

V 

X 

o 

\ 

" 

- 

- 

- 

X 

- 

~ 

- 

- 

__ 

0 

u 


0 


1 

(n 

< 

UJ 

1 

J 

-) 

Y, 

^ 

o5p 

z 

^ 

() 

U) 

C\ 

2 
< 

^ 

0 

0 

0 

0 

^ 

If) 

^ 

1^ 

(U 

.w  it) 
^^ 

11  II 

o  X 


U     S    J 
D 


10     V 
H     0 


__  — 

i 

•>                -i 

J)                                                             I        '    A            '°    o 

^                                                      t            "                 ^-^            ^ 

_.         "^                                                   7                      K_         '                  i 

^^                               / 

^?            < 

__0.t:                             ^M^             _        "x^. 

C-^                                        5s^                ""X"     J 

^                                              ^r                 ^                 ^° 

P;                                           J     AL     fc         ^i" 

--:-••                              ^         <     ?«         £' 

Q'U":^               ^  ^  *"                                      °      X 

"^IV       S  '*'                                                     ° ' 

lO  "^       V  ^ 

'^'^              "■ ^. 

'^s               ?    J'       > 

*^. 

Cr                                 ^. 

^  -h-^c            :      ^:     : 

-    ^uio                            _    S          °  ' 

Tvc                            V 

-  ^                      X 

rS                   J 

^^c                  \   '  - 

^ --t: 

---     ""Qiyu 

■^djS' 

£?<& 

S\(r> 

zz-jr    ::::_:_:::::    : 

K 

(n 
a 

1 


Q 


I"  J 

it 


(n 

IOq 

0 
ro 


ta. 


<bz 
o    <C 


II II 


tu 
P 

0 

z   i 

a  u 

o 


Impact 


477 


ARALTSIS   OF  LATERAL  ft  FlECTOlffiTER  fEADINOS 
(LATERAL  DEFLECTIONS  AT  CENTER    OF  SPiH) 


55'   -  10"    GIRDER  SPAK 
LOCOMOTIVE  CLASS   P5-A  (ELECTRIC) 


^:  Span 
::!       b       c      d       e       F       <g       h      j 

k 

1        mm 

/\ 

/\ 

/\ 

/\ 

I     54-'- O"   Cer-iFer^    +0    cer-ii'er^    oF  beanings  \ 
PL/\hJ     OF     L/\T£fS/^L.    BRAaihjq 


Concontratad  I^no 

r^lnt   Loads 

Id  F:ip« 

Required 

to   Produce 

stress 

es   in  Uenbers   in  Kips 

I^r  Square  Inoh  1 

Aotuil 

Uteml 

>)n80tloni 

Due 

to  Concentrated  ftine] 

Point  Loads        | 

M&xlmm 

Slncle 

Equal 

Equal 

Single 

Load 

Equal 

Loads 

Equal 

Loads 

Utaral 

Dime na Ion 

Load 

Loads 

Loads 

At 

At 

A1 

Run 

Spead 

Dofleotlon 

"Z" 

At 

At 

At 

"C" 

"E.G 

i   J" 

"C.E.C, 

J  i  L" 

No. 

X.P.H. 

InchoB 

F««t 

•c 

'E,G  i  J" 

"C,E,0,J  1  L" 

A-b 

f-6 

A-b 

£-6 

A-b 

f-e 

Col.l 

2 

J 

u 

5 

6 

7 

8 

9 

10 

11 

12 

13 

100 

U.3 

0.02 

-9.0 

3.20 

1.30 

1.00 

0.72 

0.(^ 

0.88 

0,08 

1.10 

0.06 

229 

L.6 

0.03 

♦7.0 

1.-80 

2.00 

1.50 

1.10 

O.li. 

1.35 

0,13 

1.70 

o.iu 

101 

lu9 

0.01 

1.60 

0.67 

0.50 

0.36 

0.05 

O.U. 

0,01. 

0.56 

o.oU 

loe 

5.6 

0.02 

3.20 

1.30 

1,00 

0.72 

0,« 

0.88 

0,08 

1.10 

0.08 

230 

7.5 

O.OL 

♦•lii-O 

6.30 

2.70 

2,00 

l.UO 

0,18 

1.80 

0.18 

2.20 

0.17 

2J2 

10.2 

o.oa 

♦7.0 

13.00 

5.30 

U.OO 

2.90 

0,36 

3.60 

0.55 

1..50 

0.3U 

231 

13.1. 

0.07 

♦29.0 

11.00 

I..70 

3.50 

2.50 

0.31 

3.20 

0.31 

3.90 

0.30 

233 

13.8 

0.08 

♦13.0 

13.00 

5.30 

1..00 

2.90 

0.36 

3.60 

0.35 

U.50 

0.3U 

253 

IJ^.2 

0.11 

17.00 

7.30 

5.50 

3.90 

0.1.8 

I..90 

0.1.8 

6.20 

0.U6 

23U 

20.8 

0.07 

♦2.0 

11.00 

I..70 

5.50 

2.50 

0.31 

3.20 

0.31 

3.90 

0.30 

235 

26.1 

0.09 

♦2.0 

lU.00 

6,00 

1..50 

3.20 

0.39 

1..10 

0.39 

5.00 

0.38 

236 

28.7 

0,12 

♦2.0 

19.00 

8.00 

6.00 

I..30 

0.53 

5J.0 

0.52 

6.70 

0.51 

237 

29.3 

0.10 

16.00 

6.70 

5.00 

3.60 

0.1.5 

1..50 

0.I4I. 

5.60 

0.U2 

lOli 

52.3 

o.oe 

♦  11.0 

13.00 

5.30 

1..00 

2.90 

0.36 

3.60 

0.35 

1..50 

0.3U 

252 

Jli.9 

0.09 

11..00 

fc.OO 

1..50 

3.20 

0.39 

U.IO 

0.39 

5.00 

0.38 

251 

ai.3 

0.10 

16.00 

e.70 

5.00 

3.60 

0.1.5 

I1.50 

O.U. 

5.60 

0.U2 

105 

1.2.3 

0.08 

♦1.3.0 

13.00 

5.30 

U.OO 

2.90 

0.36 

3.60 

0.35 

U.50 

0.3U 

238 

1.6.5 

0.10 

16.00 

6.70 

5.00 

3.60 

0.1.5 

1..50 

o.lj. 

5.60 

0.U2 

107 

W.5 

0.09  . 

♦i.8.0 

11..00 

6.00 

1.-50 

3.20 

0.39 

U.IO 

0.39 

5.00 

0.38 

106 

51.1 

O.Cf) 

♦U8.0 

lU.oo 

6.00 

I..50 

3.20 

0.39 

1..10 

0.39 

5.00 

0.38 

108 

59.5 

0.12 

♦10.0 

19.00 

B.OO 

6.00 

I..30 

0.53 

5.1.0 

0.52 

6.70 

0.51 

239 

61.5 

0.08 

13.00 

5.30 

I..00 

2.90 

0.56 

3.60 

0.35 

U.50 

0.3U 

21^ 

67.6 

0.12 

-21.0 

19.00 

8.00 

6.00 

I..30 

0.53 

5.1.0 

0.52 

6.70 

0.51 

109 

70.U 

0.16 

25.00 

11.00 

8.00 

5.70 

0.70 

7.1.0 

0.72 

9.00 

0.68 

2U0 

71.0 

0.12 

-20.0 

19.00 

8,00 

6.00 

U.30 

0.53 

5.1.0 

0.52 

6.70 

O.Sl 

2U 

T<!JU 

0.13 

-23.0 

21.00 

8,70 

6.50 

1..80 

0.59 

5.90 

0.57 

7.30 

0.55 

214? 

76.5 

0.11 

-21.0 

17.00 

7.30 

5.50 

3.90 

0.I48 

1..90 

0.1.6 

6.20 

0.U6 

2lfi 

76.5 

0.12 

19.00 

8.00 

6.00 

lu30 

0.53 

5J.0 

0.52 

6.70 

0.51 

2l£ 

78.8 

0.11 

-22.0 

17.00 

7.30 

5.50 

3.90 

0.1.8 

I..90 

o.W 

6.20 

0.U6 

2IJ, 

85.L 

0.07 

-23.0 

11.00 

I..70 

3.50 

2.50 

0,31 

3.20 

0.31 

3.90 

0.30 

21.5 

87.8 

0.10 

lo.OO 

6.70 

■i.OO 

3.60 

0,1.5 

I..50 

O.U. 

5.60 

0.U2 

111 

91.8 

o.iU 

-23.0 

22.00 

9.30 

7.00 

5.00 

0,62 

6.30 

0.61 

7.90 

0.59 

2lj8 

99.5 

0.10 

-20.0 

16.00 

(-■.70 

5.00. 

3.60 

0.1.5 

I..50 

o.UU 

5.60 

0.U2 

112 

99.7 

0.13 

♦31..  0 

21.00 

8.70 

6.50 

1..80 

0.59 

5.90 

0.57 

7.J0 

0.55 

Dlaoneion  "2"  In  cdIudi  L  Is  the  dlatanco  that  nhefl  nimtor  1  is  fl- 
the  time  of  majtimuD  lateral  deflection.  Distancee  mArkecl  "-"  Indlc 
deflection  occurred  before  •t^.f>e\  'n>.^atnr  1  had  reached  the  center  of 
BBrknd  "+"  Indicate  that  the  naxlaiisi  lateral  deflection  ooourred  af 
the  center  of  the  span* 


the  center  of  tho  span  at 

e  that  the  rnaximuir.  lateral 

'o  span.   Distancee 

r  whool  r.un^'rr  1  had  passed 


478 


Impact 


TAhL£  32 

ANALYSIS   OF  LAIKRAL  DEFLECTOMITER  READINGS 
(LATERAL  DEflFCIIONS  AT  CENTER  OF  EPAJl) 

55"   -  10"    GIRDER  SPAH 
LOCOHOTIVE  CLASS   GC-1   (ElicTRIC) 


D!recHor-i 
o f    rums 


Concentrated  F^mel 

Point  Loade 

I 

In  Klp< 

Required 

to  Produce 

stress 

E   in  Uembers   in  Eipa 

Per  Square  Inch 

Actual 

Lateral  Deflections 

Due 

to  Concentrated   I^nel 

Point  Loads 

Uajilmm 

Single 

Equal 

Equal 

Sintle 

Load 

Equal   Loads 

Equal  Loads 

Literal 

Dimenelon 

Load 

Loada 

Loads 

At 

At 

At 

Run 

Spead 

Deneotlon 

"Z" 

At 

At 

At 

"G" 

"E.C  4  J" 

"C,E,G,J  1:  L"     I 

No, 

U.F.H. 

Inchea 

Feet 

"0" 

E,  0  «:  J" 

"C, E.C.J  4  L" 

A-b 

f-6 

A-b            f-6 

A-b 

f-fe 

Col.l 

2 

3 

1. 

5 

6 

7 

8 

9 

10            11 

12 

13 

155 

luU 

0.C2 

5.20 

1.30 

1.00 

0,72 

0.09 

0.88          0.08 

1.10 

0.06 

156 

9.8 

0.01 

1,60 

0.67 

0,50 

0,36 

o,oU 

o,UU       o.oU 

0.56 

O.OU 

229 

10.3 

0.02 

3.20 

1.30 

1.00 

0,72 

0.09 

0.88          0.08 

1.10 

0,06 

157 

12.7 

O.02 

3.20 

1.50 

1,00 

0,72 

0.09 

0.88          0.08 

1.10 

0,08 

158 

15.6 

0.03 

t21.0 

U.eo 

2.00 

1.50 

1,10 

O.lU 

l.Uo       0.13 

1.70 

0.13 

159 

18.5 

o.oe 

5.20 

1.30 

1,00 

0,72 

0.09 

0.88          0.08 

1.10 

0,08 

160 

25.0 

0.02 

3.20 

1.30 

1.00 

0.72 

0.09 

0.88          0,08 

1.10 

0.08 

161 

28.7 

0.03 

♦27.0 

U.80 

2,00 

1.50 

1.10 

O.lU 

l.Uo      0.15 

1.70 

0.15 

165 

J5.2 

0.03 

♦33.0 

I4-80 

2.00 

1.50 

1.10 

O.lU 

l.Uo      0.13 

1.70 

0.13 

16e 

35.7 

O.OU 

♦27.0 

6.30 

2.70 

2.00 

i.Uo 

0.18 

1.80          0,18 

2.20 

0.17 

227 

39.7 

0.05 

-  7.0 

7.90 

5.30 

2.50 

1.80 

0,22 

2,20          0.22 

2.80 

0.21 

163 

39.8 

0.03 

♦  9.0 

li.BO 

2.00 

1.50 

1.10 

O.lU 

l.Uo       0,13 

1.70 

0.13 

16U 

I4U.7 

O.Oli 

♦57.0 

6.30 

2.70 

2.00 

l.Uo 

0.18 

1.80         0.18 

2.20 

0.17 

166 

50.1 

O.Qli 

♦1*0.0 

6.30 

2.70 

2.00 

i.Uo 

0.18 

1.80          0.18 

2.20 

0.17 

226 

51.1 

0.06 

♦  12.0 

9.50 

It.  00 

5.00 

2.20 

0.27 

2.70         0.26 

5.UO 

0.25 

178 

5J4.8 

0.10 

16.00 

6.70 

5.00 

3.60 

0.U5 

U.50        O.UU 

5.60 

0.U2 

225 

57.0 

0.06 

9.50 

U.OO 

3.00 

2.20 

0.27 

2.70          0.26 

3.U0 

0.25 

177 

59.8 

0.10 

+56.0 

16.00 

6.70 

5.00 

3.60 

0.U5 

U.50       o,UU 

5.60 

0.U2 

179 

60.9 

0.10 

♦28.0 

16.00 

6.70 

5.00 

3.60 

0.U5 

U,50       o,UU 

5.60 

0.U2 

176 

614.6 

0.03 

♦28.0 

U4.00 

6.00 

I4.50 

5.20 

0.39 

U.io       0.39 

5.00 

0.38 

22i* 

«.U 

0.08 

13.00 

5.30 

Ij.OO 

2.90 

0,36 

5,60       0.35 

U.50 

0.3U 

175 

71.6 

0.12 

♦  32.0 

19.00 

8.00 

6.00 

U.30 

0,53 

5.U0        0.52 

6.70 

0.51 

17U 

73.0 

0.11 

♦I4O.O 

17.00 

7.30 

5.50 

3.90 

0.U8 

U.90         0.U8 

6.20 

0.U6 

223 

73.0 

0.08 

♦20.0 

13.00 

5.30 

U.00 

2.90 

0.36 

3.60       0.35 

U.50 

0.3U 

221 

78.7 

0.09 

lli.OO 

6,00 

li.50 

3.20 

0.39 

U.io       0.39 

5.00 

0.38 

171 

79.5 

0.12 

♦38.0 

19.00 

8,00 

6.00 

U.30 

0.53 

5.U0        0.52 

6.70 

0.51 

222 

80.6 

0.06 

13.00 

5.30 

U.00 

2.90 

0,56 

3.60       0.35 

u.50 

0.5U 

167 

82.1 

0.08 

+61,0 

13.00 

5.30 

U.OO 

2.90 

0.36 

3.60       0.35 

u.50 

0.3U 

216 

83.5 

0.11 

-21,0 

17.00 

7.30 

5.50 

3.90 

0,UB 

U.90       o.US 

6.20 

0.U6 

168 

BU.0 

0.11 

♦65.0 

17.00 

7.30 

5.50 

3.90 

O.UB 

U.90       0.U8 

6.20 

0.U6 

217 

86.0 

O.li* 

-22.0 

22.00 

9.30 

7.00 

5.00 

0.(£ 

6.30        0.61 

7.90 

0.59 

215 

86.9 

0.12 

-22.0 

19.00 

8.00 

6.00 

14.30 

0.53 

5.U0        0.52 

6.70 

0.51 

169 

90.U 

0.12 

♦  8ii.O 

19.00 

8.00 

6.00 

u.30 

0.53 

5.U0        0,52 

6.70 

0.51 

218 

92.9 

0.12 

-21,0 

19.00 

8,00 

6.00 

U.50 

0.55 

5.U0        0.52 

6.70 

0,51 

170 

95.9 

0.12 

♦80,0 

19.00 

8,00 

6,00 

u.30 

0.53 

5.U0     0.52 

6.70 

0.51 

220 

97.0 

0.06 

-22.0 

9.50 

U.OO 

3.00 

2.20 

0,27 

2.70        0.26 

5.U0 

0.25 

173 

98.5 

0.11 

♦21.0 

17.00 

7.30 

5.50 

3.90 

0,UB 

U.90         O.UB 

6.20 

0.U6, 

172 

105.0 

0.11* 

♦19.0 

22.00 

9.30 

7.00 

5.00 

0.62 

6.30        0,61 

7.90 

0.59 

Dtnanfilon  "Z"    In  oolumn  U  is   the  distance   that  wneel   number   1    le    from  the  center  of  the  span  at 
the  time  of  maxljouin  lateral   deflection.      Diatancea  marked  "   -  "    Indicate   that  the  majclinuin 
lateral  deflection  occurred  before  v^eel  number  1  had  reached  the  oentor  of  the   span.      Dlatano«a 
marked  "  4  **  indicate  that  the  naxlimm  lateral  deflection  ooeurred  after  wheol  number  1  had 
paeeed  the  oAnter  of  the   span. 


Impact 


479 


AMALTSIS  OF  UIERAL  DEFLECTOMETEF   KEADINCIS 
(LATERAL  DEFLECTIONS  AT  CENTER  OF  SPAN) 


55'  -  10"    GIRDER  SPAH 
LOCOMOTIVE  CLASS  Kli-S   (STEAM) 


Dir<scHor-i 
of    rums 


^ 


f=>L/\hJ     OF    L/\TEIS/\L    BRACiNQ 


Concentrated  F^jiel 

Point  Loads 

J 

in  Kipt 

Required 

to  Produce 

Streoe 

e   in  Hembere^n 

Kips 

Vr  Square  Inch 

Actual 

Lateral  DefleotionB 

Due 

to  Concentrate( 

Panel 

Point  Loads 

Maxinuni 

Single 

Equal 

Equal 

Slncle 

Load 

Equal  Loads 

Equal   Loads 

Lateral 

Dimension 

Load 

Loads 

Loads 

At 

At 

At 

Run 

Spe 

ed 

Deflection 

"Z" 

At 

At 

At 

"G" 

"E.G  * 

J" 

"C.E.O.J 

&  L" 

No. 

ll.P.H. 

R.P.S. 

Inches 

Feet 

"G" 

E,G  4  J" 

"C, E.G.J  1  L" 

A-b 

t-t 

A-b 

f-6 

A-b 

f-K 

Col.l 

2 

3 

h 

5 

6 

7 

8 

9 

10 

11 

12 

13 

11. 

132 

5.2 

0.37 

o.cii 

»19.0 

6.30 

2.70 

2.00 

1.1.3 

0,18 

1,80 

0.18 

2.25 

0.17 

128 

18.9 

1.3U 

0.12 

♦314-0 

19.00 

8.00 

6,00 

li.30 

0,53 

5.UO 

0.52 

6.71. 

0.51 

127 

26.6 

1.88 

0.13 

♦22,0 

21.00 

8,70 

6.50 

1*.80 

0.59 

5.90 

0.57 

7.30 

0.-55 

126 

30.1 

2.13 

0.15 

-  U.0 

2lt.00 

10.00 

7.50 

5.U0 

0,67 

6.80 

0.66 

8,1.0 

0.63 

125 

35.6 

2.52 

0.15 

+21.0 

2U.00 

10.00 

7.50 

5.UO 

0.67 

6.80 

0.66 

8.1.0 

0.63 

121* 

Uo.o 

2.8li 

0.16 

-11.0 

25.00 

10.70 

8.00 

5.70 

0,70 

7.20 

0.70 

9.00 

0.66 

130 

UO.2 

2.85 

0.16 

♦28,0 

25.00 

10,70 

8.00 

5.70 

0.70 

7.20 

0.70 

9.00 

0,68 

151 

ia.7 

2.96 

o.lU 

♦21.0 

22.00 

9,30 

7.00 

5.00 

0.62 

6.30 

0.61 

7.90 

0.59 

129 

142.6 

3.02 

O.lii 

-  U,0 

22.00 

9.30 

7.00 

5.00 

0.62 

6.30 

0.61 

7.90 

0.59 

123 

14^.2 

3.13 

0.1I4 

-  2.0 

22.00 

9,30 

7.00 

5.00 

0.62 

6.30 

0,61 

7.90 

0.59 

21i» 

U5.8 

3.25 

0.10 

♦  2.0 

16,00 

6,70 

5.00 

3.60 

0.U5 

U.50 

O.li. 

5.60 

0.1.2 

122 

52.3 

3.70 

0.16 

♦lit.O 

25.00 

10,70 

8,00 

5.70 

0.70 

7.20 

0.70 

9.00 

0.67 

121 

55.5 

3.93 

O.lii 

-13.0 

22.00 

9.30 

7,00 

5.00 

0.62 

6.30 

0.61 

7.90 

0.59 

206 

57.5 

U.07 

0.10 

-  6.0 

16.00 

6,70 

5.00 

3.60 

0.U5 

U,50 

o.U. 

5.60 

0.1.2 

195 

59.3 

U.20 

0.10 

-  5.0 

16.00 

6,70 

5.00 

3.60 

0.1.5 

U,50 

o.U. 

5.60 

0.1.2 

209 

60.0 

U.25 

0.13 

♦  3.0 

21,00 

8.70 

6.50 

U.80 

0.59 

5,90 

0.57 

7.30 

0.55 

196 

60.3 

U.28 

0.15 

-23.0 

21.00 

8.70 

6.50 

I4.8O 

0.59 

5.90 

0.57 

7.30 

0.55 

210 

63.3 

U.148 

0.13 

♦21.0 

21.00 

8.70 

6.50 

1..80 

0.59 

5.90 

0.57 

7.30 

0.55 

197 

63.9 

U.53 

0.11 

-22.0 

17.00 

7.50 

5.50 

3.80 

0,1.8 

l.,90 

0.1.8 

6.20 

0.1.6 

211 

65.5 

lu61i 

0.11 

-  5.0 

17.00 

7.30 

5.50 

3.80 

0,1.8 

1..90 

0.1.8 

6.20 

0.16 

120 

67.0 

U.75 

O.li* 

♦32.0 

22.00 

Q.30 

7.00 

S.OO 

o,ea 

6.30 

0.61 

7.90 

0.59 

198 

67.7 

lt.80 

0.12 

-20.0 

19.00 

8.00 

6,00 

U.30 

D.55 

5.U0 

0.52 

6.71. 

0.51 

212 

68.U 

i4.85 

o.iL 

♦30.0 

22.00 

9.50 

7,00 

5.00 

0.62 

6.50 

0.61 

7.90 

0.59 

199 

^.0 

U.89 

0.10 

-21.0 

16.00 

6,70 

5.00, 

3.60 

0,1.5 

I..50 

O.U. 

5.60 

o.Lz 

213 

70.6 

5.00 

0.11 

-11.0 

17.00 

7.50 

5.50 

3.80 

o,U8 

I..90 

0.1.8 

6.20 

0.1.6 

U8 

71.0 

5.0U 

0.13 

-10.0 

21.00 

8.70 

6.50 

U.80 

0,59 

5.90 

0.57 

7.30 

0.55 

200 

72.1 

5.12 

0.09 

-21.0 

1U.00 

6,00 

li-50 

3.20 

0.39 

Ij.lO 

0.59 

5.05 

0.38 

201 

77.3 

5.I47 

0.12 

19.00 

8,00 

6.00 

I4.30 

0.53 

5.1.0 

0.52 

6.71. 

0.51 

202 

79.1i 

5.63 

0.12 

-21,0 

19.00 

8,00 

6.00 

U.30 

0.53 

5.1.0 

0.52 

6.71. 

0.51 

116 

80.3 

5.72 

0.15 

-12.0 

2U.00 

10.00 

7.50 

5.I4O 

0,67 

6,80 

0.66 

8.1.0 

0.63 

203 

82.2 

5.82 

0.10 

-21.0 

16.00 

6.70 

5.00 

3.60 

0.1.5 

1,50 

O.li. 

5.60 

0.1.2 

113 

auO 

5.96 

0.16 

-16,0 

25.00 

10.70 

8.00 

5.70 

0.70 

7.20 

0.70 

9t00 

0.68 

iiU 

85.0 

6.03 

0.15 

♦19.0 

2U.00 

10,00 

7.50 

5.U0 

0.67 

6.80 

0,66 

8.1.0 

0.6a 

20U 

85.0 

6.03 

0.16 

♦15.0 

25.00 

10.70 

8.00 

5.70 

0.70 

7.20 

0,70 

9.00 

0.68 

115 

87.0 

6.16 

0.16 

-17.0 

25.00 

10,70 

8.00 

5.70 

0.70 

7.20 

0.70 

9.00 

0.66 

207 

68.0 

6.23 

O.Ut 

22.00 

9,30 

7.00 

5.00 

0.62 

6.}0 

0.61 

7.90 

0.59 

206 

88.5 

6.26 

0.11 

-21,0 

17.00 

7.30 

5.50 

3..  80 

0.1.8 

l.,90 

O.W 

6.20 

0.U6 

205 

89.U 

6.33 

0.12 

19.00 

8.00 

6.00 

U.30  . 

0.53 

5J.0 

0.58 

6.71. 

0.51 

MOTEi  DiawRBlon  "Z"  In  column  U  is  the  dlstAnoo  that  wh»ol  number  1  ic  froai  th 
tlao  or  mutljnun  latsraX  deriootlon.  Diatwicee  marked  "  -  "  indicate  tha 
flection  ooourr«>d  before  wheal  mmber  1  had  raaohed  the  center  of  the  ap 
indicate  that  the  majclmn  lateral  deflection  occurred  after  -jheol  mmber 
the  epan. 


I   center  of  the   cpaa  at  the 

:  the  imxlrrutr  lateral  de* 
in.      Distance!  'narked  "   «  " 
1   had  patted  the   center  of 


480 


Impact 


TABLE  JU 


ANALYSIS   OF  lATERAL  DEFLECTOlffiTER  READINGS 
(LATERAL  DEFLECTIONS  AT  CENTER  OF  SPAN) 


55'   -  10"    GIRDER  SPAM 
LOCCMOTIVE  CLASS  Ml-A  (STEAM) 


of 


I    5'-4'-0"  Ceri-hsr-    i-<=>  Ctsri-ter^  of  beanjncgsA 
PL/\hJ    OF     L/\TafS/\L^  BR^ClNq 


Concentrated   ftmel 

Point  Loads 

in  Kips   Required 

to  Produce 

Stress 

38   in  Mambere   1 

I  Kips 

Per  Equa 

re   Inch 

Actual 

Lateral  Deflection! 

Due 

to  Concentrated  Ruiel 

Point  Loads         | 

Maxiinmn 

Sincle 

Equal 

Equal 

Sintle 

Load 

Equal  Loads 

Equal 

Loads 

Lateral 

Dimension 

Load 

Loads 

Loads 

At 

At 

At 

Run 

Speed 

Deflection 

At 

At 

At 

"G" 

"E,G  *  J" 

"C,E,C, 

J  k  L" 

No. 

U.P.H. 

S.P.S. 

Inches 

Feet 

"G" 

'E,G  4-  J" 

"C,E,G,J  *  L" 

A-b 

f-g 

A-b 

f-6 

A-h 

f-fc 

Col.l 

2 

3 

1* 

5 

6 

7 

8 

9 

10 

11 

12 

13 

lU 

133 

U.8 

0.38 

0.05 

+19.0 

1*.80 

2.00 

1.50 

1.10 

0.15 

1.1*0 

0.13 

1.70 

0.13 

13U 

9.0 

0.71 

0.07 

+51.0 

11.00 

1*.70 

3.50 

■     2.50 

0.31 

3.20 

0.31 

3.90 

0.50 

135 

13.  J 

1.05 

0.10 

t69.o 

16.00 

6.70 

5.0.0 

5.60 

0.1*5 

lt.50 

o.UU. 

5.60 

0.U2 

136 

19.5 

1.51* 

0.12 

19.00 

8.00 

6.00 

U.30 

0.53 

5.UO 

0.52 

6.70 

0.51 

1J7 

25.0 

1.98 

0.15 

21.00 

e.70 

6.50 

1*.80 

0.59 

5.90 

0.57 

7.30 

0.55 

150 

25.2 

1.99 

0.12 

19.00 

8.00 

6.00 

1*.30 

0.53 

5.1*0 

0.52 

6.70 

0.51 

li49 

29.U 

2.32 

0.13 

+55.0 

21.00 

8.70 

6.50 

U.eo 

0.59 

5.90 

0.57 

7.30 

0.55 

llifl 

3i*.e 

2.75 

0.17 

+57.0 

27.00 

11.00 

8.50 

6.10 

0.76 

7.1*0 

0.72 

9.50 

0.72 

m 

1(0.3 

3.18 

O.ll* 

t   1.0 

22.00 

9.30 

7.00 

5.00 

0.62 

6.30 

0.61 

7.90 

0.59 

Vi-i 

U.5 

3.28 

O.ll* 

•»  5.0 

22.00 

9.30 

7.00 

5.00 

,0.62 

6.50 

0.61 

7.90 

0.59 

193 

I42.O 

3.52 

O.lU 

22.00 

9.30 

7.00 

5.00 

0.62 

6.;o 

0.61 

7.90 

0.59 

189 

1*5.9 

3.U7 

0.12 

19.00 

8.00 

6.00 

1*.50 

0.53 

5.1*0 

0.52 

6.70: 

0.51 

15U 

l*s.2 

3.65 

0.13 

+28.0 

21.00 

8.70 

6.50 

1*.80 

0.59 

5.90 

0.57 

7.50 

0.55 

188 

U6.5 

5.67 

0.10 

16.00 

6.70 

5.00 

3. 60 

0.1*5 

1*.50 

o.U* 

5.60 

0.U2 

1146 

li7.o 

3.71 

o.ll* 

t60.0 

22.00 

9.30 

7.00 

5.00 

0.62 

6.30 

0.61 

7.90 

0.59 

187 

1*7.0 

3.71 

0.11 

.  1*.0 

17.00 

7.30 

7.30 

5. 80 

0.U8 

1*.90 

o.Us 

6.20 

0.U6 

152 

1*7.2 

3.72 

0.12 

t55.o 

19.00 

8.00 

6.00 

!*.30 

0.53 

5.1*0 

0.52 

6.70 

0.51 

151 

1*7.1. 

3.7U 

O.ll* 

•121.0 

22.00 

9.30 

7.00 

5.00 

0.62 

6.30 

0.61 

7.90 

0.59 

191 

1*9.5 

3.91 

0.10 

-10.0 

16.00 

6.70 

5.00 

3.60 

0.1*5 

U.50 

O.UU 

5.60 

0.U2 

19U 

U9.7 

3.92 

0.10 

+  2.0 

16.00 

6.70 

5.00 

3. 60 

0.1*5 

U.50 

O.UU 

5.60 

0.1*2 

11*3 

50.2 

3.96 

0.18 

+25.0 

29.00 

12.00 

9.00 

6.60 

0.82 

8.10 

0.79 

10.00 

0.76 

192 

51.1* 

1*.06 

0.10 

-  5.0 

16.00 

6.70 

5.00 

3.60 

0.U5 

U.50 

o.UU 

5.60 

0.U2 

190 

53.8 

1*.25 

0.10 

0 

16.00 

6.70 

5.00 

5.60 

0.1*5 

U.50 

o.UU 

5.60 

0.U2 

"liiS 

51*.3 

li.29 

0.16 

+20.0 

25.00 

11.00 

8.00 

5.70 

0.70 

7.U0 

0.72 

9.00 

0.68 

iia 

57.0 

lt.50 

0.12 

-  U.0 

19.00 

8.00 

6.00 

U.30 

0.53 

5.U0 

0.52 

6.70 

0.51 

mo 

58.5 

U.6C 

0.12 

+20.0 

19.00 

8.00 

6.00 

1*.30 

0.53 

5.U0 

0.52 

6.70 

0.51 

185 

60.0 

1*.7U 

0.11 

+13.0 

17.00 

7.50 

5.50 

3.80 

0.I48 

U.90 

O.US 

6.20 

0.U6 

186 

62.8 

1*.96 

0.10 

♦21*.  0 

16.00 

6.70 

5.00 

J.  60 

0.U5 

U.50 

O.UU 

5.60 

O.US 

lUl 

61*.8 

5.12 

0.15 

+19.0 

21.00 

B.70 

6.50 

U.80 

0.59 

5.90 

0.57 

7.30 

0.55 

139 

66.5 

5.25 

0.16 

+28.0 

25.00 

11.00 

8.00 

5.70 

0.70 

7.U0 

0.72 

9.00 

0.68 

18U 

67.7 

5.31* 

0.12 

19.00 

8.00 

6.00 

1*.30 

0.55 

5.U0 

0.52 

6.70 

0.51 

182 

68.1 

5.38 

0.18 

+32.0 

29.00 

12.00 

9.00 

6.60 

0.82 

8.10 

0.79 

10.00 

0.76 

183 

69.9 

5.52 

0.10 

-  3.0 

16.00 

6.70 

5.00 

J. 60 

0.1*5 

U.50 

O.UU 

5.60 

0.U2 

158 

71.2 

5.62 

O.li* 

-20.0 

22.00 

9.30 

7.00 

5.00 

0.62 

6.30 

0.61 

7.90 

0.59 

181 

72.8 

5.75 

0.12 

+36.0 

19.00 

8.00 

6.00 

U.30 

0.53 

5.U0 

0.52 

6.70 

0.51 

180 

75.7 

5.98 

0.16 

25.00 

11.00 

8.00 

5.70 

0.70 

7.U0 

0.72 

Q.OO 

0.68 

LI42 

77.9 

6.15 

0.15 

-  3.0 

21*.  00 

10.00 

7.50 

5.1*0 

0.67 

6.80 

0.66 

8.UO 

0.63 

Dlmonfllon  "2"  In  colximn  U  is  the  distance  that  wheel  number  1  ia  from  the  center  of  the  span  at  the 
tlmo  of  nftjcijnum  lateral  defleotion,  Distancoa  marked  "-"  lndloat«  that  the  maxiinum  lateral  deflec- 
tion occurred  before  wheel  nuaiber  1  had  reached  the  center  of  the  span,  *  Distances  marked  "  +  "  in- 

ccurred  after  wheel  number  1  had  passed  the  center  of 


dicate  that  the  maximum  lateral  defle 


the 


span. 


AMALYSIS  OF  LATERAL  DEFLECTOBETER  READINGS 
(LATERAL  DEFLBCTIOHS  AT  CENTER  OF  SPAS) 

122'   .  ()•    OIRDEE  8PAH 
LOCOMOTIVE  CLASS   I5-A  (EI£CTRIC) 

i  Spar-) 
f->     I     J     k      I     m   nop 


s     -h    u     \^    v^    X 


^ 


PL/KM 

OF    L.^TaR/KL     BRACIMC^ 

1 

CBie«ntr«ted  nmel  Fsint  Lokda  In 

lipa  Kequlrtd 

stress**  in  UsBtbar* 

In  lip* 

P*r  Squar*  Inoh 

td  Froduc*  Aotukl 

Lat*r«l  Dcflietloiu 

Dua 

to  Couoontratad  !^ui*. 

Point  Load* 

SquU 

KVH 

Equal 

Equal 

laada 

n.^— 

Slngl* 

Squal 

Load! 

L*?4* 

Load* 

Singli 

Load 

Equal 

Load* 

Equal 

Load* 

Iqual  Laada 

At 

Utar&l 

Dljunslan 

Lwid 

Load* 

At 

At 

At 

At 

At 

At 

At 

"C.K.G, 

I.E.M 

Bob 

ClM«4 

Dvflaotlon 

"Z" 

At 

At 

"I.I.X 

"S.I.K.M 

"C.E,G,I,K,M 

"M" 

■k.w 

,0" 

"I.K,* 

.o.«" 

"0,I,K.II,0,Q,«" 

0,4,8, D.lT    1 

■•. 

H.F.E. 

Inoh«i 

F»*t 

•ir 

"K.M.O" 

O.Q 

O.Q.S" 

0,11,8, U.ll" 

A-b 

L-K 

A-b 

L-U 

A-b 

L-U 

A-b 

L-M 

A-b 

L-M 

C.1.1 

2 

5 

It 

5 

6 

7 

6 

9 

10 

11 

12 

13 

U* 

15 

16 

17 

18 

19 

IW 

U.3 

0 

229 

lu6 

0 

101 

U.9 

0 

lOB 

5.6 

0.01 

+26.0 

I'Sin 

0.5U 

0.36 

0.28 

0.25 

O.ll* 

0.02 

0,15 

o.ce 

0.17 

o.oe 

0.19 

0.9U 

O.oe 

0,21* 

O.oe 

230 

7.5 

0.05 

-  9.0 

2.70 

1.80 

1J*0 

1,10 

0.70 

0.10 

0,77 

0,10 

0.86 

0.10 

a.10 

1.20 

0.09 

2JS 

10.2 

0.06 

flS.O 

8.80 

3.30 

2.10 

1.70 

i,Uo 

0.81* 

0.12 

0,91* 

0.12 

1.00 

0.12 

1.10 

0.12 

1.50 

0.12 

231 

13  J* 

0.06 

t68.0 

8.80 

J.30 

2,10 

1.7c 

LliO 

0.81* 

0.12 

0.9U 

0,12 

1.00 

0.12 

1.10 

0.12 

1.50 

0.12 

233 

15.8 

0.07 

+2iu0 

10.00 

3.60 

2.50 

8.00 

1.60 

0.95 

O.li* 

1.10 

o,u* 

1.20 

o.li* 

1.30 

o.ll* 

1.70 

O.li* 

253 

lii.2 

0.06 

8.80 

J.30 

2.10 

1.7c 

1.1*0 

0.81* 

0.12 

0.91* 

0.12 

1.00 

0.12 

1.10 

0.12 

1.50 

0.12 

1(9 

17.2 

O.Qb 

+30.0 

5.90 

2.20 

I.I4O 

loie 

0,91 

0.56 

0.06 

0.63 

0.08 

0.67 

0.08 

0.73 

0.08 

0.95 

0.08 

23U 

20.8 

0.07 

>,  6.0 

10.00 

3.80 

2.50 

2.00 

1,60 

0.95 

O.ll* 

1.10 

o.ll* 

1.20 

o.ll* 

1.30 

O.ll* 

1.70 

O.li* 

235 

26.1 

0.07 

-20.0 

10.00 

3.80 

2.50 

2.00 

1.60 

0.95 

O.ll* 

1.10 

o.u* 

1.20 

o.ll* 

1.30 

O.li* 

1.70 

0,li* 

236 

28.7 

0.07 

tll.O 

10.00 

3.80 

2.50 

2.00 

1.60 

0.95 

O.li* 

1.10 

o.ll* 

1.20 

o.u* 

1.30 

O.ll* 

1.70 

O.li* 

237 

29.3 

0.07 

^i^.O 

10.00 

J.BO 

2.50 

2.00 

1.60 

0.95 

O.U* 

1.10 

o.ll* 

1.20 

o.ll* 

1.30 

o.ll* 

1.70 

o.li* 

loU 

J2.3 

0.<g 

\uhfi 

1.60 

1.10 

0.65 

0.6C 

0.1)2 

0.06 

0.1*6 

0.06 

0.5; 

0.06 

0.57 

0.06 

0.63 

0.05 

252 
251 

105 

3l*.9 

0,07 

10.00 

3.60 

2.50 

2.00 

1.60 

0.95 

O.ll* 

1.10 

o.ll* 

1.20 

o.ll* 

1.30 

o.ll* 

1.70 

o.li* 

ia.3 

lj2,J 

0.06 

12.00 

iuUO 

2.90 

2.J0 

1.80 

1,10 

0.16 

1.30 

0.16 

1.1*0 

0.16 

1.50 

0.16 

1.90 

0.15 

o.oU 

♦61.0 

5.90 

2.20 

i.Uo 

1.10 

0.91 

0.56 

0.08 

0.63 

0.08 

0.67 

0.08 

0.73 

0.06 

0.95 

0.06 

238 

1>6.5 
1^.5 

0.07 

+21.0 

10.00 

3.80 

2.50 

2.00 

1.60 

0.95 

O.U* 

1.10 

O.ll* 

1.20 

0,11* 

1.30 

o.li* 

1.70 

o.u* 

107 

o.oU 

+i^.O 

5.90 

2.20 

I.I4O 

1.10 

0.91 

0.56 

0.08 

0.63 

0.08 

0.67 

o.oe 

0.73 

o.oe 

0.95 

0.06 

106 

51.1 
59.5 
61.5 

0.06 

■♦32.0 

8.80 

5.30 

2.10 

1.70 

i.Uo 

0.81* 

0.12 

0.91* 

0.12 

1.00 

0.12 

1.10 

0.12 

1.50 

0.12 

loe 

0.06 

♦78.0 

8.80 

J.30 

2.10 

1.70 

l.itO 

0.81* 

0.12 

0.91* 

0.12 

1.00 

0.12 

1.10 

0.12 

1.50 

0.12 

239 

o.u 

+33.0 

16.00 

6.00 

J. 90 

3.10 

2.50 

1.50 

0.22 

1.70 

0,22 

1.90 

0.22 

IbfO 

0.16 

1.90 

0.15 

21^6 
109 
2U0 
21d 
2U9 

67.6 
70.U 
71.0 
72.1* 
76,5 

O.Sit 

o.iU 

0.22 
0.22 
0.25 

♦58.0 

♦65.0 
♦65.0 
♦56.0 

35.00 

21.00 

32.00 

32.00 
37.00 

IJ.OO 
7.60 
12.00 
12.00 
lii.OO 

8.60 
5.00 
7.90 
7.90 
8.90 

6.80 

3.90 

6.20 
6.20 
7.00 

5.1*0 

3.20 
5.00 
5.00 

5.70 

3.30 
2.00 
3.00 
3.00 
3.50 

0.1*8 
0.29 
0.1*1* 
0.1jl* 

0.51 

3.70 

2.20 

3.1*0 
3.1*0 
l*.oo 

0.1*7 
0.27 
0.1*3 
0,1^ 
0.50 

1*.10 
2.1*0 
3.80 
3.80 

1*.30 

0.1*8 
0.38 
0.1*5 
0.1*5 
0.50 

1*.70 
2.50 
U.20 
lt.20 
1*.70 

0.1*8 

o.a 

0.U* 

0.1*1* 

0.50 

5.70 
5J*0 
5.20 
5.» 
6,00 

0.1*6 
0.27 
0.1*2 

0.1*6 

2U3 
21^ 
110 
2U5 
lU 

76.5 
78.8 
81.6 
87.8 
91.8 

0.30 

0.20 
0.22 

0.31 
o.;o 

♦56.0 

♦52.0 

+77.0 
♦aU.o 

U4.OO 
29.00 
52.00 
I16.OO 
1)U.OO 

16.00 
11.00 
12.00 
17.00 
16.00 

11.00 
7.10 
7.90 
11.00 
11.00 

8.i40 

5.60 
6.20 
8.70 
8.1*0 

6.80 
U.50 
5.00 
7.00 
6.80 

1*,20 
2.80 
3.00 
l*.ljO 
lt.20 

0.60 
0.1*0 
0.U* 

0.63 
0.60 

1*.60 
3.10 

3.1*0 
1*.90 
1*.60 

0.58 
0.1*0 
0.1*3 
0.61 
0.58 

5.30 

3,1*0 

3.80 

5,30 
5.30 

0.62 
0.1*0 

0.1*5 

0.62 

o.6e 

5.60 
3.70 
1*.20 
5.80 
5.6O 

0.59 

0<1*0 
0.1.1* 
0.62 
0.59 

7.10 
1*.70 
5.20 
7.J0 
7.10 

0.57 
0.38 
0.1*2 
0.59 
0.57 

2U7 
112 

95.2 
96.3 
99.5 
99.7 

0.2U 
0.27 
0.23 
0.18 

+91.0 

♦89.0 
♦89.0 

J5.00 

ItOrOO 

31».00 

27.00 

13.00 
15.00 

12,00 
9.80 

8.60 
9.60 
8.20 

6.1*0 

6.80 
7.60 
6.50 
5.10 

5.1*0 

6.10 
5.20 
1*.10 

3.30 
3.80 
3.20 
2.60 

0.1*8 

oiU 
0.37 

3.70 
1*.50 
3.U0 
2.80 

0.1*7 

0.5I* 
0.1*3 
0.35 

U.10 

1*.60 
5.60 

5.10 

0.1*8 

0.51* 

0.L6 
0.56 

1*.70 
3J*o 

0.1*8 
0.51* 

o.i;6 

0.36 

5.70 
6.1*0 
5.1*0 
1*.30 

0.1*6 
0.52 

0.35 

Dljuiiaion  "Z"  In  oolu«in  1*  1*  th.  dlstano*  that  i.*:«*l  nuaibur  1  1* 
lat.ral  d.fl.etl.n.      Dlatanoos  aaurllad  "  -  "   Indloat.  that  the  1 
b.r  1  had  reaoh.d  th*  oent.r  ot  the  *p*ll.      Watam;.*  «i*rl»il 
oorrad  aftw  iih.*l  mnaber  1  had  p«***d  the  o.nter  of  the  span. 


clmum  lateral  defleotlon  oaeurred  before  wheel  nuB- 
'   Indicate  that  th*  MTlsiim  lateral  deflection     0*- 


TABLE  56 

ANALYSIS   OP  LATERAL  DEFLECTOHETEB  READINGS 
(LATERAL  DEFLECTIONS  AT  CENTER  OF  SPAN) 

128'   -  0"    GIRDQ)  SPAN 
LOCaiOTIVE  CLASS   GO-1   (ELECTRIC) 


a    h  c  <:J  e    f 


Oi'i-iSC-tiort 

»- 

O  F     r-Lj  r-ts 


PL  AM   OF     L/<KTBR/\U    Bf2/\CIMQ 


Conoontratad  Ftmal   Point 

Loada   in 

KlpB  Saqulrad 

Straia 

ai    In  linaban 

In  Kipa 

Par  Squara  Inoh 

to  Produov 

Aotual  Lataral  Dtflaotiona 

Dua 

to  Conoantratad  ^oal  Point  Loada 

Eijual 

Equal 

Equal 

Equal 

Loada 

U.-.-I11*.. 

Slnglo 

Equal 

Loada 

Loada 

Loada 

Slngla 

Laad 

Equal 

Load! 

Equal 

Loada 

Equal  Loada 

At 

Lattral 

Disenilon 

Load 

Loada 

At 

At 

At 

At 

At 

At 

At 

"C.E.G, 

I.K.M 

Run 

Spaad 

Dafleetlon 

■z" 

At 

At 

"I.K.M, 

"G.I.K.M, 

"C, E.G.I, K.H 

•ir 

•k.m 

,0" 

"I.K.M.O.Q" 

•G.I.K.M 

O.Q.S" 

o.n.s.o.n"  1 

lo. 

M.P.B. 

Inohei 

Fa*t 

■JT 

"K.M.O" 

O.Q" 

0,Q,8" 

o,Q,s,u,w" 

h.\> 

L-M 

A-b 

L-U 

A^b 

UM 

A-b 

L-M 

A.b 

L-H 

Col.l 

2 

3 

u 

5 

6 

7 

8 

9 

10 

11 

12 

13 

lU 

15 

16 

17 

18 

19 

155 

Jul* 

0.01 

t52.o 

1.50 

O.5I* 

0.36 

0.28 

0.23 

O.ll* 

0.02 

0.15 

0.02 

0.17 

0.02 

0.19 

0.02 

0.2U 

0.02 

156 

9.8 

0.01 

♦1*6.0 

i*!w 

0.51* 

0.36 

0.28 

0.23 

O.ll* 

o.oe 

0.15 

0.02 

0.17 

0.02 

0.19 

0.02 

0.2U 

O.oe 

157 

12.7 

0.{g 

t20.0 

1.60 

1.10 

0.85 

0.68 

0.1j2 

0.06 

0.U6 

0.06 

0.55 
0.3U 

0.06 

0.57 

0.06 

0.65 

0.05 

O.oU 

158 

15.6 

0.02 

2.90 

1.10 

0.71 

0.56 

0.1*5 

0.28 

O.Ql* 

0.31 

O.oU 

O.oU 

0.37 

O.oU 

0.U7 

159 

18.5 

0.02 

2.90 

1.10 

0.71 

0.56 

0.1*5 

0.28 

O.oU 

0.31 

O.C^ 

0.5U 

O.oU 

0.37 

O.CU 

O.U7 

O.oU 

160 

25.0 

O.OU 

tl2.0 

5.90 

2.20 

1.1*0 

1.10 

0.91 

0.56 

o.oe 

0.63 

0.08 

0.67 

0.08 

0.73 

0.06 

0.95 

o.oe 

161 

28.7 

O.QU 

tlit.0 

5.90 

2.20 

1.1*0 

1.10 

0.91 

0.56 

0.08 

0.63 

0.08 

0.67 

0.08 

0.73 

0.08 

0.95 

0.06 

O.oU 

i6e 

55.7 

0.02 

2.90 

1.10 

0.71 

0.56 

0.1*5 

0.28 

O.oU 

O.Jl 

O.oU 

0.5U 

O.OU 

0.57 

o,oU 

0.U7 

227 

39.7 

0.06 

»21i.0 

8.80 

3.30 

2.10 

1.70 

1.1*0 

o.sl* 

0.12 

0.9U 

0.12 

1.00 

0.12 

1.10 

0.12 

1.50 

0.12 

163 

39.8 

o.oU 

t20.0 

5.90 

2.20 

1.1*0 

1.10 

0.91 

0.56 

o.oe 

0.6J 

0.08 

0.67 

o.oe 

0.73 

0.06 

0.95 

0.08 

I6I1 

Uul 

O.QU 

♦77.0 

5.90 

2.20 

I.I4O 

1.10 

0.91 

0.56 

0.08 

0.63 

O.oe 

0.67 

o.oe 

0.75 

0.08 

0.95 
0.U7 

o.oe 
O.oU 
o.iU 

166 

50.1 

0.02 

♦12.0 

2.90 

1.10 

0.71 

0.$6 

0.1*5 

0.28 

O.oU 

0.31 

O.OU 

0.5U 

O.oU 

0.37 

O.OU 

O.IU 

226 

51.1 

0.07 

♦22.0 

10.00 

3.80 

2.50 

2.00 

1.60 

0.95 

o.iU 

1.10 

o.iu 

1.20 

o.iU 

1.30 

1.70 

17B 

5U.8 

0.06 

♦55.0 

8.80 

3.30 

2.10 

1.70 

1.1*0 

0.81* 

0.12 

0.9U 

0.12 

1.00 

0.12 

1.10 

0.12 

1.50 

0.12 

225 

177 
179 
176 
22i* 

57.0 

0.06 

♦55.0 

8.80 

3.30 

2.10 

1.70 

1.1*0 

0.81* 

0.12 

0.9U 

0.12 

1.00 

0.12 

1.10 

0.9U 
0.9U 
1.30 
1.10 

0.12 

1.50 

1.20 
1.20 
1.70 

1.50 

0.12 
0.09 
0.09 

o.iU 

59.8 
60.9 

6U.5 

0.05 
0.05 
0.07 
0.06 

♦65.0 
♦66.0 
♦66.0 
♦71.0 

7.1;0 
7.1*0 
10.00 
8.80 

2.70 
2.70 
3.80 
3.30 

1.80 
1.80 
2.50 
2.10 

I.UO 
1.1*0 
2.00 
1.70 

1.10 
1.10 

1.60 

1.1*0 

0.70 
0.70 
0.95 
O.8I1 

0.10 
0.10 

o.iU 

0.12 

0.77 
0.77 
1.10 
0.9U 

0.10 
0.10 
o.iU 
0.12 

0.86 
0.66 
1.20 
1.00 

0.10 

0.10 

o.iU 

0.12 

0.10 
0.10 

o.iU 

0.12 

175 
171* 
223 
221 
171 

71.6 
73.0 
73.0 
78.7 
79.5 

0.06 
0.08 
0.08 
0.10 
0.13 

♦19.0 

+m.o 
♦19.0 
+35.0 

♦61*.0 

8.80 
12.00 
12.00 
15.00 
19.00 

3.JO 

1*.1*0 

l*.l*o 
5.1*0 
7.10 

2.10 
2.90 
2.90 
3.60 
It.  60 

1.70 
2.50 
2.30 
2.80 
3.70 

itL-o 
i.eo 

1.80 

2.30 
3.00 

0.81* 

1.10 
1.1*0 
1.80 

0.12 

0:16 

0.16 
0.21 
0.26 

0.9U 
1.30 
1.30 
1.50 

2.00 

0.12 
0.16 

0.16 
0.19 
0.27 

1.00 

I.UO 
i.Uo 
1.70 
2.20 

0.12 
0.16 

0.16 

0.20 
0.26 

1.10 

1.50 
1.50 
1.90 
2.50 

0.12 
0.16 

0.16 

0.20 
0.26 

1.50 
1.90 
1.90 
2.U0 
5.10 

0.12 
0.15 
0.15 
0.19 
0.25 

222 

167 
216 
I6e 
217 

80.6 
82.1 
83.5 
8U.0 
86.0 

0.15 
0.10 

0.09 
0.13 
0.32 

♦35.0 
♦22.0 
♦23.0 
♦87.0 
♦86.0 

22.00 
15.00 
13.00 
19.00 
1*7.00 

8.20 
5.1*0 
U.90 
7.10 
17.00 

5.1*0 
3.60 
J. 20 
l*.6o 
11.00 

U.20 
2.80 
2.50 
3.70 
9.00 

3.1*0 
2.50 

2.00 
3.00 
7.30 

2.10 
1.1*0 
1.20 
1.80 

U.50 

0.30 

0.21 
0.18 
0.26 
0.6U 

2.30 
1.50 

I.UO 

2.00 

U.eo 

0.31 
0.19 
0.18 
0.27 
0.6U 

2.60 
1.70 
1.50 

2.20 
5.30 

0.30 

0.20 
0.18 
0.26 
0.62 

2.60 
1.90 
1.70 
2.50 
6.00 

0.30 
0.20 

o.ie 
0.26 

0.6U 

5.60 
2.U0 
2.10 
5.10 

7.70 

0.29 
0.19 
0,17 
0.25 
0.62 

215 
1<9 
218 
170 
220 

86.9 
9O.I4 
92.9 
95.9 
97.0 

o.iUi 
0.09 
0.37 

0.22 
0.36 

♦90.0 
♦I4S.0 
♦82.0 
♦52.0 
♦97.0 

65.00 
13.00 
51*.  00 
32.00 
53.00 

21*.  00 
U.90 
20.00 
12.00 
20.00 

16.00 

3.20 
15.00 
7.90 
13.00 

12.00 
2.50 

10.00 
6.20 

10.00 

10.00 
2.00 

8.1*0 
5.00 
8.20 

6.20 
1.20 
5.10 
3.00 
5.00 

0.89 
0.18 
0.7U 
O.UU 
0.72 

6.80 

i.Uo 
5.70 
3.U0 
5.70 

0.90 
O.IB 
0.75 
0.U3 
0.75 

7.60 
1.50 
6,20 
3.80 
6,20 

0.90 

o.ie 
0.7U 

O.UU 
0.7U 

e.oo 
1.70 
6.70 
U.20 
6.70 

o.fl5 

0.18 

0.71 

O.UU 

0.71 

10.50 
2.10 
6.80 
5.20 
6.60 

o.eU 
0.17 
0.71 
0.U2 

0.69 

173 
219 
172 

98.5 
100.8 
105.0 

0.32 
0.21* 
0.27 

♦101.0 
♦127.0 
♦12lu0 

1*7.00 
35.00 
1*0.00 

17.00 
13.00 
15.00 

11.00 
8.60 
9.60 

9.00 

6.80 
7.60 

7.30 

5.1*0 
6.10 

U.50 
3.30 
3.80 

0.6U 
O.UB 
0.55 

U.eo 
3.70 
U.30 

0.6U 
0,U7 
0.5U 

5,30 
U.10 
U.60 

0.62 
0.U8 
0.5U 

6.00 
U.50 
5.10 

0.6U 
O.UB 

0.5U 

7.70 
5.70 
6.U0 

0.62 
0.U6 
0.52 

1 

1  munbor  1   is   fro 

m  the  0) 

ntar  0 

f  tha   »I 

>an  at 

tha  tima  of  max 

imum 

Dinenalon  Z 
liit«ral  dafl 
ber  1  had  r« 
ourred  aftvr 


In  ooliiini  ii  la  tha  distance   ,,— —  -  .  ^    - 

(otlon.  Dietanoae  narked  "  -  "  indicate  that  the  nuucijiiQiii  lateral  defleotlon  ocourrad  before 
Lohed  the  center  of  the  span,  Dl.tanoefl  marked  "  -  "  Indicate  that  the  maximum  lateral  defle 
i^eel  miBber  1  had  paeeed  the   center  of  the  span. 


ASALTSIS   OF  LATEHAL  mnECJCMETSR  READIHOS 
(LATERAL  DEFI£CTIONS  AT  CEHTER  OP  SPAM) 


122'   -  0"   OIHIER  SPAS 
LOCOMOTIVE  CLASS  Kli-S   (STEAM) 


<a    beds    F 


»• 

oF     r~LJr-)S 


Y 


f=^LAM    OF     LA\TEfS/\L    B/SACtN(q 


Cono»ntrated  Brm.l  Point 

Loads  in  Klpa   Raqulrsd 

Strsssss  in  Ucmbsrs 

in  Kips 

Psr  Squars  Inch 

to 

Produce 

Actual  Utcral  D»fl 

Botlons 

Du< 

to  Conosntratsd  Pansl 

Point  Loads 

Equal 

Equal 

Equal 

Equal 

Uads 

ItexlKm 

Slngl* 

Equed 

Loads 

Loads 

Loads 

Slnel. 

Load 

Equal 

Loadd 

Equal 

Loads 

Kqual 

Loads 

At 

Latsnl 

Dla«iiBlan 

Lo&d 

Loads 

At 

At 

At 

At 

At 

At 

A< 

"C.B.G. 

I.X.H 

Hun 

Sp.^ 

D*fl«otlan 

"Z" 

At 

At 

"I.K.M 

"G.I.K.M 

"C,E,G,I,I,1J 

"li" 

"K.ll.O" 

°I,K.II,0,Q" 

"0,I,I,Jl,0.(i,8" 

o.<J,a 

.li.*- 

Rs. 

M.P.B 

8.P.S 

InchaB 

P*et 

"IT 

"K.ll.O" 

O.Q" 

O.Q.S" 

o.Q.s.n.n" 

A-b 

L-H 

A-b 

L-U 

A-b 

UH 

A-b 

UH 

A-b 

L-M 

Col.l 

2 

3 

u 

5 

6 

7 

8 

9 

10 

11 

12 

13 

li 

15 

16 

17 

19 

20 

21 

132 

5.2 

0.37 

0 

128 

18,9 

1.31* 

o.ce 

■tlll.O 

2.90 

1.10 

0.71 

0.56 

0.1*5 

0.27 

0,C^ 

0.31 

O.Olt 

0.31* 

o.oi* 

0.37 

o.ol* 

0.1*7 

o,ct* 

127 

26.6 

1.89 

0.09 

+  1.0 

13.00 

U.90 

3.20 

2.50 

2.00 

1.20 

0,18 

1.1*0 

0.16 

1.50 

0.16 

1.70 

0.16 

2.10 

0,17 

126 

JO.l 

2.13 

0.06 

4J4U.O 

8.80 

5.30 

2.10 

1.70 

1.1*0 

o.ai* 

0,12 

0.91* 

0.12 

1.00 

0.12 

1.10 

O.U 

1.50 

0,12 

125 

55.6 

2.52 

0.12 

+  8.0 

18.00 

6.50 

WO 

3.U0 

2.70 

1.70 

0.25 

1.90 

0.21* 

2.10 

0.21* 

2.30 

0.21* 

2.60 

0,23 

12U 

Uo.o 

2.au 

0.09 

+16.0 

13.00 

U.90 

3.20 

2.50 

2.00 

1.20 

0.18 

I.I4O 

0.18 

1.50 

0.18 

1.70 

0.1s 

2,10 

0,17 

130 

1;0.2 

2.85 

0.06 

+65.0 

8.80 

3.30 

2.10 

1.70 

1.1*0 

0.81* 

0.12 

O.9I* 

0.12 

1.00 

0.12 

1,10 

0.12 

1,50 

0.12 

131 

ia.7 

2.96 

0.10 

421.0 

15.00 

5.UO 

3.60 

2.80 

2.30 

1.1*0 

0,20 

1.50 

0.21 

1.70 

0.20 

1.90 

0.20 

2,1*0 

0,19 

129 

142.6 

3.02 

0.15 

+52.0 

22.00 

8.20 

5.1*0 

1*.20 

5.1*0 

2,10 

0.30 

2.50 

0,31 

2.60 

0.30 

2.80 

0.30 

3.60 

0,29 

123 

hU.z 

3.13 

0.06 

+52.0 

8.80 

3.30 

2,10 

1.70 

1.1*0 

0,81* 

0.12 

0.91* 

0,12 

1.00 

0.12 

1.10 

0.12 

1.50 

0,12 

21ii 

U5.8 

3.25 

0.07 

+21.0 

10.00 

3.80 

2.50 

2.00 

1.60 

0,95 

O.lt* 

1.10 

0,U* 

1.20 

0,11* 

1.30 

O.li* 

1.70 

O.U* 

122 

52.3 

3.70 

o.oU 

+11.0 

5.90 

2.20 

1.1*0 

1.10 

0.91 

0,56 

0.08 

0.63 

0,08 

0.67 

0,08 

0.71* 

Q.oe 

0.95 

0.08 

121 

55.5 

3.93 

0.09 

+13.0 

13.00 

U.90 

3.20 

2.50 

2.00 

1,20 

0.18 

1.1*0 

0.18 

1.50 

0,18 

1.70 

0.16 

2,10 

0.17 

209 

57.5 

1*.07 

0.11 

+27.0 

16.00 

6.00 

5,90 

3.10 

2.50 

1,50 

0.22 

1.70 

0.23 

1.90 

0.22 

2.10 

0.22 

2.60 

0.21 

195 

59.3 

Ji.21 

0.10 

+36.0 

15.00 

5.UO 

3,60 

2.S0 

2.30 

1,1*0 

0.20 

1.50 

0.21 

■1.70 

C,2C 

1.90 

0.20 

2,1*0 

0.19 

209 

60.0 

U.25 

0.10 

+J1I.O 

15.00 

5.1*0 

3.60 

2,80 

2.30 

1.1*0 

0.20 

1.50 

0.21 

1.70 

0,20 

1.90 

0.20 

2,1*0 

0.19 

196 

60.3 

U.28 

0.10 

+32.0 

15.00 

5.1*0 

3.60 

2.80 

2.30 

1.1*0 

0.20 

1.50 

0.21 

1.70 

0,20 

1.90 

0.20 

2,1.0 

0.19 

119 

62.2 

u.ia 

0.08 

+2U.0 

12.00 

1*.30 

2.90 

2.30 

l.SO 

I.IO 

e.i6 

1.20 

0.16 

1.1*0 

0,16 

1.50 

0.16 

1,90 
2.1*0 

0.15 

210 

«.3 

h.\3 

0.10 

+ia.o 

15.00 

5.1*0 

3.60 

2.80 

2.50 

1.1*0 

0.20 

1.50 

0.21 

1.70 

0,20 

1.90 

0.20 

0.19 

197 

65.9 

i*-53 

0.11 

+it6.0 

16.00 

6.00 

5.90 

5.10 

2.50 

1.50 

0,22 

1.70 

0.23 

1.90 

0.22 

2.10 

0.22 

2.60 

0.21 

2U 

65.5 

1^61* 

0.11 

+59.0 

16,00 

6.00 

3.90 

3,10 

2.50 

1.50 

0.22 

1.70 

0.23 

1.90 

0.22 

2.10 

0.22 

2.60 

0,21 

120 

67.0 

U.75 

0.12 

-  luO 

18.00 

6,50 

U.30 

3.1*0 

2.70 

1.70 

0.25 

1.90 

0.2lj 

2.10 

0.21* 

2.30 

0.21* 

2,60 

0.23 

198 

67.7 

U.80 

0.12 

-^tO.O 

18.00 

6,50 

1*.30 

3.1*0 

2.70 

1.70 

0.25 

1.90 

0.2i* 

2.10 

0.2J* 

2.30 

0.21* 

2.60 
2.60 
2.1*0 
3.10 

0.23 

212 

68  .li 

i*.85 
5.00 

0.11 

+50.0 

16.00 

6,00 

3.90 

3.10 

2.50 

1.50 

0.22 

1.70 

0.23 

1.90 

0.22 

2.10 

0.22 

0,21 

199 
213 

69.0 
70.6 

0.10 
0.13 

+11.0 
+ii7.0 

15.00 
19.00 

5J*0 
7.10 

3.60 

lt.60 

2,80 
5.70 

2.30 
3.00 

1.1*0 
1.80 

0,20 
0,26 

1.50 
2.00 

0.21 
0.27 

1.70 
2.20 

0.20 
0.26 

1.90 
2.50 

0.20 
0.26 

0,19 
0.25 

118 
200 
117 
201 

2oe 

71.0 
72.1 
76.3 
77.3 
79  J* 

5.01* 
5.12 
5.I4O 
5.U8 
5.6U 

0.07 
O.Mi 
0.15 
0.18 
O.Ut 

+2ii.O 
+51.0 
+106.0 

+  50.0 
+  UU.0 

10.00 
21.00 
22.00 
26.00 
21.00 

3.80 
7.60 
8.20 
9. 80 
7.60 

2.50 
5.00 

5.1*0 
6.1*0 
5.00 

2,00 
3.90 
1*.20 
5.10 
5.90 

1.60 
3.20 

3.1*0 
IflO 
3.20 

0.95 
2.00 
2.10 
2.50 
2.00 

O.ll* 
0.29 
0.30 
0.36 
0.29 

1.10 
2.20 
2.J0 
2.80 
2.20 

O.ll* 
0.29 

0.31 
0.57 
0.29 

1.20 

2.1*0 
2.60 
3.00 
2.1*0 

O.U* 
0.28 
0.30 
0.36 
0.26 

1.30 
2.60 
2.80 

3.U0 
2.60 

0.11* 
0.26 
0,30 
0.36 
0.26 

1.70 
3.UO 
3.60 

1*.30 
5.1*0 

O.li* 
0.27 
0.29 
0.35 
0.27 

116 
2(? 

113 

2QU 

lli* 

80.8 
82.2 
SU.O 
85.0 
85.0 

5.73 
5.83 
5.95 
6.03 
6.0J 

0.12 
0.15 

0.18 
0.2U 

+23.0 
+77.0 
+53.0 
+75.0 
+61t.O 

18.00 
22.00 
21.00 
26.00 
35.00 

6.50 
8.20 
7.60 
9.80 
13.00 

1*.30 
5.1*0 
5.00 
6.1*0 
8.60 

3.1*0 
lu20 
3.90 
5.10 
6.80 

2.70 
3.1*0 
3.20 

l*.io 

5.50 

1.70 
2.10 
2.00 
2,50 
3.30 

0.25 
0.30 
0.29 
0.36 
O.IjB 

1.90 
2.30 
2.20 

2.80 
3,70 

0.2i* 
0.31 
0.29 
0.37 
0.1*9 

2.10 
2.60 
2.1*0 
5.00 
1*.10 

0.2lt 
0.30 
0.28 
0.36 
0.99 

2.30 
2.80 
2.60 
3.1*0 
I..50 

0.21* 
0.30 
0.28 
0.36 
0.1*8 

2.80 
5.60 

3,1*0 
I..30 
5.80 

0.23 
0.29 
0.27 
0.35 
0.1«6 

115 
207 

87.0 
88.0 

6.17 
6.2U 

0.16 
0.30 

+53.0 
490.0 

26.00 

Wi-oo 

9.80 
16.00 

6.it0 
11.00 
3.60 
5.00 

5.10 
8.1*0 
2.80 
3.90 

1*.10 
6.80 
2.50 
5.20 

2.50 

1*.20 
1.1*0 
2.00 

0.36 
0.60 
0.20 

2,80 
1*.60 
1.50 
2.20 

0.37 
0.60 
0.21 

5.00 
5.20 
1.70 

0.56 
0.62 
0.20 

5.1*£i 
5.60 
1.90 

0.36 
0.59 
0.20 

U.30 

7.10 
2,1*0 

0.55 
0.58 
0.19 

206 
205 

88.3 
89  .U 

6.26 
6.31. 

0.10 

o.iU 

+97.0 
+65.0 

15.00 
21.00 

5.U0 
7.60 

0.29 

0.29 

2.I1O 

0.26 

2.60 

0.28 

3,1*0 

0.27 

Dimension  "Z"  in  column  1*  is  the  distance  that  wheel  nuiober 
lateral  deneotlon.  Distances  narked  "-"  indicate  that  the 
1  had  reached  the  center  of  the  span.  Distances  marked  + 
after  wheel  number  1  had  passed  the  center  of  the  span. 


1  is  from  the  center  of  the  span  at  the  time  of  maiimum 
maximum  lateral  deflection  occurred  before  wheel  number 
indicate  that  the  maximum  lateral  doflootlo 


Impact 


481 


§5 
5 


^ 

<; 

^ 

\ 

^ 

i. 

3 

.- 

\ 

> 
\ 

<^ 

v\ 

\ 

'^v 

-^ 

I 

X 

\ 

0- 

\ 

^ 

? 

C  0 

^ 

< 

^ 

y 

-< 

V 

U 
"$ 

< 

< 
< 

Si 

^ 

< 

^ 

^ 

4: 

0> 

< 

< 

^ 

^ 

s 

< 

V, 

y 

73 

^ 

^> 

0 

s 

^ 

^ 

< 

; 

a 

S 

■f 


n 

0   B 


58 


^  e 


0^ 


0  P 
Q  0 


1  ^--^ 

ll    5   '.', 

il  ^  ^'^ 

°o   i  .3 

1     J 
1  '1 

o 

sasR 

IRS'SS'S 

s-ssics 

r^ass'S 

r;S&;52 

C(.3Sc. 

ooooo 

g^SS2 

o  o  o  o 

sssss 

gg^oo 

o  o  o  o*  o 

ooooo 

^  o^o^c^c^ 

sssgs 

sssgs 

•^&s°s 

o  o  o  o  o 
o  o  o  o  o 

ooooo 

lr.l/^u^l/^u^ 

ooooo 

ooooo 

ooooo 

g^sss 

ssias^ 

ITvW   ^  r-l  M 

vO-OvO-OsO 

S!!)S2S 

OD  w  co-o  o 

CJ.J.Ol 

B  ^^w 

s?,sss 

O  O  O  Q  O 

S3SS3 

ooooo 
most— -J-irv 

ooooo 

ooooo 
ifst— _d■-?^- 

ooooo 

•H  .-*  t-^  OJ 

t--cy  2S 

S58i3iS 

-iCJ   ^   rH  .-. 

«as2;2 

ssiS;2S 

^DK^CT.^  o 

^^J°  W 

ss^» 

^ 

P3&SS 

sgsss 

ooooo 

Q  O  O  O  O 

ooooo 

gss^g 

o  o  O  O 
O  O  o  o 

0 

SSSiS;? 

g^ScdSS 

sO.Os0<>>O 

S  Sy  CU^S 

.H  OJ  cu  «-«  ^ 

CO  K\0-0   «H 
rH  rr\  CJ  ri  (M 

»t;3RS 

■c3S>S&ffi 

o  o  o  o  o 

S&32g 

ooooo 

OOOOO 

ooooo 

Cy   l/N^r-l  W 

8S82S 

&S82g 

S&&8 

HJ 

O^^CVJCVJ 

rtrfrH^rt 

-HOJCVJ-- 

r.CM.W^ 

1   .     ^■^- 

S  <S  rt  .     ".%_ 

0-3   3    *  -p  :-;    • 

r  1^=. 

o 

28^S& 

SRSSS 

ooooo 
o  a>  m  eoiD 

8?,Sg8 

sssss 

&S838 

oooo 

^o  o  oo 
o  o  o  o  o 

S8888 

8SS&& 
88888 

ooooo 
O  f*^K^K\K^ 

§8888 

gsss^g. 

88888 

ooooo 

oj  °  8  i>S 
88888 

W-J'Lf\KNKN 

ooooo 

O  Q  O  p  O 

3^Vu!;3 

SP828 

88888 

Sgg,8 
38^3 
8888 

--SSRS!? 

sssas 

aasiJiSi 

J?SS£iS 

SdS!2iS 

SS2S 

S-  £ 
S 

u^ 

o  o          o 

ii   i 

ooooo 

Urn 

t^rH   O  lA-^ 

V +'♦'7  «■ 

ooooo 

ooooo 

OOOOO 

iiii 

illl 

- 

o    »»S8S 

asisgff 

S8888 

&SSS® 

8^382 

jisaiss 

22ad 

ooooo 

OOOOO 

ooooo 

ooooo 

ooooo 

oooo 

II- 

K\ 

R    PSSSK 

PSSS,5 

»SP!iP! 

^S««if 

MNO  ir^oc 

P       8«xO«J 

..... 

-5    -S^^K 

^3333 

:33S5i3 

SSRg^R 

^RRsa 

ii 

t 

3  ^£5&3 

sssss 

^gg|S», 

SS9IS 

33ls« 

ISISs 

S2§2 

£.05 


rest 


482 Impact 

In  order  to  arrive  at  the  lateral  force  present,  the  span  was  considered  as  a  hori- 
zontal truss  and  the  force,  acting  at  the  center,  or  at  other  panel  points,  which  would 
produce  the  measured  deflection,  was  computed.  For  the  SS-ft.  10-in.  span,  the  central 
force  was  found  to  be  as  high  as  25,000  lb.  for  the  P5-A  electric  locomotive  and  K4-S 
steam  locomotive,  and  29,000  lb.  for  the  Ml-A  locomotive.  On  the  122-ft.  span  a  central 
force  of  65,000  lb.  was  found  for  the  GG-1,  and  from  43,000  to  46,000  lb.  for  the  other 
locomotives.  Had  these  deflections  been  measured  at  the  top  flange,  where  the  force  was 
applied,  they  should  have  been  somewhat  larger  than  those  recorded,  with  a  consequent 
increase  in  the  magnitude  of  the  force  necessary  to  produce  them. 

The  force  causing  this  lateral  deflection  is  largely  due  to  the  nosing  of  the  loco- 
motive, caused  by  the  oscillations  about  its  vertical  axis.  Considering  the  force  as  applied 
at  a  panel  point,  it  does  not  produce  particularly  high  stresses  in  the  girders  or  bracing, 
as  shown  in  the  tables.  If  however  it  represents  the  lateral  pressure  of  one  wheel,  and 
that  force  were  applied  to  the  girder  betwen  panel  points,  quite  high  local  bending 
stresses  might  be  found  in  the  top  flange. 

10.  Conclusions 

These  tests  afforded  an  opportunity  to  measure  and  compare  the  dynamic  effects 
on  the  same  spans,  of  electric  and  steam  locomotives  running  over  a  wide  range  of  speeds, 
up  to  the  probable  maximum  speeds  to  be  expected  from  either  class.  The  instruments 
used  were  of  such  number  and  type  that  it  was  possible  to  obtain  simultaneous  readings 
in  several  parts  of  the  same  span,  providing  certain  information  not  heretofore  available. 

A  great  deal  of  interesting  and  valuable  data  was  obtained  but  it  must  be  remem- 
bered that  these  tests  represent  but  two  spans,  and  while  there  is  evidence  that  certain 
factors  are  more  important  than  had  been  general!)'  realized,  it  is  recommended  that, 
until  they  can  be  verified  by  other  tests,  there  be  no  revision  of  the  impact  allowances  as 
now  provided  for  by  the  AREA  design  specification  or  rating  rules. 

The  analysis  of  these  data  was  particularly  helpful  in  that  it  resulted  in  a  clearer 
conception  as  to  the  desirability  of  investigating  certain  factors  in  future  tests. 

From  the  data,  as  found  from  these  tests,  it  seems  logical  to  conclude  that: 

(1)  With  the  possible  exception  of  speed  effect  and  lateral  forces,  the  impact  allow- 
ances, as  now  provided  for  in  the  section  on  design  of  the  AREA  Specifications  for  Steel 
Railway  Bridges,  and  Rules  for  Rating  Existing  Iron  and  Steel  Bridges,  are  ample. 

(2)  In  these  two  spans,  at  least,  there  was  an  increase  in  the  vertical  force  due  to 
speed.  These  forces  are  of  such  magnitude  that  they  require  further  investigation,  and 
if  it  is  found  that  they  occur  in  other  spans,  it  will  be  necessary  to  include  some  allow- 
ances for  them.  While  there  has  been  evidence  of  such  forces  in  other  tests,  they  were 
not  so  apparent,  due  to  the  fact  that  runs  were  not  made  at  such  high  speeds  and  the 
instruments  used  were  not  suitable  for  their  exact  measurement. 

(3)  Further  investigation  should  be  made  as  to  lateral  or  nosing  forces.  While  this 
is  not  so  important  in  the  design  of  new  structures,  definite  information  as  to  their 
magnitude  is  necessary  for  determining  the  capacity  of  old  structures.  The  forces  as 
computed  from  the  measured  lateral  deflections  as  found  in  these  tests,  are  somewhat 
greater  than  those  provided  for  in  the  rating  rules. 

(4)  In  these  tests  it  was  found  that  the  track  effect  did  not  increase  with  the 
square  of  the  speed  as  provided  for  in  the  rating  rules,  and  the  measured  values,  in  all 
cases,  were  less  than  those  called  for  in  the  design  specification. 

(5)  The  determination  of  impact  by  the  measurements  of  stresses,  when  suitable 
instruments  are  used,  is  more  satisfactory  than  determination  by  measuring  deflections. 
This  is  especially  true  for  short  spans. 


Impact 483 

11.  Acknowledgment 

The  Committee  on  Impact  and  the  American  Railway  Engineering  Association  are 
deeply  indebted  to  the  Pennsylvania  Railroad  for  the  use  of  the  most  complete  data 
covering  these  tests.  They  throw  much  needed  light  on  several  aspects  of  the  impact 
problem. 


Report  of  Committee  3 — Ties 


John  Foley,  Chairman, 
R.  S.  Belcher 

W.   C.   BOLIN 

W.  H.  Brameld 
H.  F.  Brown 
W.  J.  Burton 
R.  E.  Butler 
F.  G.  Campbell 


S,.  B.  Clement 
R.  L.  Cook 
H.  R.  Duncan 
C.  F.  Ford* 
W.  E.  Gardner 

W.    R.    GiLLAM 

B.  D.  Howe 

C.  T.  Jackson 


W.  D.  Simpson,  Vice-Chairman, 

J.   E.   LOCKHART 

A.  F.  Maischaider 
E.  F.  Salisbury 
Raymond  Swenk 
Sverre  Thorvaldson 

C.   D.  TURLEY 

A.  W.  White 

Committee 


*  Died  June  9,   1940. 


To   the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Revision   of   Manual. 
No  report. 

2.  Extent  of  adherence  to  specifications. 

Report  of  observations  made  during  1940,  submitted  as  information  below. 

3.  Substitutes  for  wood  ties. 
No  report. 

4.  Tie  averages  and  costs  per  maintained  mile. 

Progress  report,  presented  as  information  page  486 

5.  Investigate  and  report  on  the  dimensions  of  ties,  and  bring  up  to  date  the  in- 
formation presented  in  the  1924  and  1932  Proceedings. 

Progress  report,  presented  as  information  page  487 

6.  Cause  and  control  of  sphtting  in  railroad  ties. 
No  report. 

The  Committee  on  Ties, 

John  Foley,  Chairman. 


Report  on  Assignment  2 

Extent  of  Adherence  to  Specifications 

W.  D.  Simpson  (chairman,  subcommittee),  R.  S.  Belcher,  W.  C.  Bolin,  W.  H.  Brameld, 
H.  F.  Brown,  W.  J.  Burton,  F.  G.  Campbell,  R.  L.  Cook,  H.  R.  Duncan,  W.  E. 
Gardner,  W.  R.  Gillam,  B.  D.  Howe,  C.  T.  Jackson,  J.  E.  Lockhart,  E.  F.  Salisbury, 
Raymond  Swenk,  Sverre  Thorvaldson,  A.  W.  White. 

The  following  statements  regarding  the  ties  and  their  surroundings  observed  during 
1940,  are  submitted  as  information. 

The  committee  as  a  whole  examined  in  June  and  in  November,  1940,  the  seasoning 
and  creosoted  stocks  of  six  railroads  at  the  yards  of  six  wood  preserving-plants  in  the 
Mississippi  valley,  five  west  and  one  east  of  the  river. 


Bulletin  423,  February,  1941. 


485 


486 Ties 

Four  of  the  railroads  represented  procured  their  ties  in  the  territories  traversed  by 
their  lines.  All  six  railroads  obtained  their  supplies  in  Arkansas,  Louisiana,  Missouri, 
Oklahoma  and  Texas. 

The  majority  of  the  3,000,000  ties  observed  were  oak,  with  gum  and  pine  next  in 
number.  All  of  them  had  been  purchased  under  AREA  specifications  and  marked  to 
designate  AREA  standard  sizes.  Their  inspection  as  a  whole  left  little  to  be  desired, 
except  in  the  case  of  one  railroad,  some  of  whose  ties  had  been  accepted  when  decayed, 
were  undersize,  and  were  not  well  manufactured.  Since  these  ties  came  from  the  same 
localities  as  the  other,  better  ones  observed,  only  laxity  in  the  maintenance  of  standards 
can  account  for  their  poorer  quality. 

The  sanitary  condition  of  only  one  seasoning  yard  was  unsatisfactory,  though 
none  of  the  commercial  yards  equalled  in  cleanliness  and  orderliness  the  railroad  owned 
and  operated  yard  among  those  visited.  In  the  substandard  yard  referred  to  the  vege- 
tation constituted  a  fire  hazard  and  decayed  ties  sunk  into  the  ground  are  not  suitable 
sills  for  seasoning  stacks.  In  general  the  stacking  of  ties  had  been  well  done,  but  in  one 
yard  the  number  of  misplaced  stringers  and  of  ties  touching  each  other  in  the  layers 
reflected  disregard  for  probable  decay. 

Two  of  the  railroads  had  their  ties  stacked  eight  to  a  layer  of  Sizes  4  and  S  and 
nine  to  a  layer  of  Sizes  1,  2,  and  3;  the  other  roads'  ties  were  spaced  nine  and  ten  to  a 
layer,  respectively.  The  wider  spacing  did  not  result  in  more  split  ties  than  prevailed 
with  the  closer  spacing,  which  corresponds  with  observations  elsewhere  in  the  past,  and 
refutes  the  contention  that  accelerated  splitting  from  wide  spacing  is  more  of  a  problem 
than  decay  from  spacing  too  close  to  permit  sufficient  seasoning. 

All  the  locations  visited  in  1940  were  under  observation  several  years  ago,  and  the 
improvement  in  the  ties  and  their  care  is  so  marked  in  most  cases  as  to  reflect  con- 
siderable credit  on  those  responsible  for  it.  The  change  for  the  better  demonstrates  that 
"where  there's  a  will,  there's  a  way." 


Report  on  Assignment  4 

Tie  Averages  and  Costs  per  Maintained  Mile 

John  Foley   (chairman,  subcommittee),  W.  J.  Burton,  Su  B.  Clement,  H.  R.  Duncan, 
A.  F.  Maischaider. 

The  statistics  of  tie  renewals  appearing  on  the  folded  inserts  (Tables  A  and  B  for 
1939,  and  Table  C  for  the  last  five  years  and  averages  of  them)  comprise  the  data 
reported  to  the  Interstate  Commerce  Commission  by  railroads  in  the  United  States  and 
to  this  Association  by  Canadian  railroads.  They  were  given  advance  publication  in 
Bulletin  418,  June-July,   1940. 

Comparisons  between  railroads  are  practically  only  when  allowance  is  made  for 
variations  in  practice  which  would  influence  the  costs  in  columns  3  and  S  of  Table  A 
and  column  6  of  Table  B.  The  different  prices  at  which  ties  are  charged  out  are  due 
not  only  to  the  factors  listed  on  page  309  of  the  1929  Proceedings,  but  are  affected  by 
whether  or  not  these  costs  include  expenses  for  adzing,  boring,  incising  or  ironing  any 
or  all  ties,  for  freight  on  preservative  and  ties  to  the  treating  plant,  for  inspection,  etc. 


M 


n, 
F. 
n. 

he 
id 
ill 

:d 
d- 
er 

jy 

as 


ee 
or 
fie 
n- 
at 
a 


U 


;:^-1 


l^^^is 


3:5 


[hill 

:l    is 


"5 


IISss 


lag- 


■J 
".    la 

I  ^ 


iff; 


i'S 


[Js  I  d  I 


S  I  S3 


I 


a  "  "  e  °. 


■a  ;|l 
°  J  =  t 


3S 


1 ".  a  3  3 


3&^ 


M 


n, 
F. 
n. 

[le 
id 
ill 

2d 
d- 
er 

jy 

as 

ee 
or 
he 


at 
a 


\2 


3 

5 
l2 

5  ^ 

I  !i 

3  6  « 

a  »  « 

'^  «  S 

3  i 


3  " 
I 


4  J! 

s 

gggSE 

ssgjg 

S?I3S 

3    sB?? 

3     S-sS? 

^ 

sggsg 

gssss 

iS?2s 

O  O^r-iS* 

sgasfl 

1  is§s 

Hals 

llgss 

SI 

:38i 
3fi 

„ 

CT> 

Ss32i 

SS3SS 

£?SS3 

S   SSs§ 

sgj^s 

D  -VI  CO  c-  e- 

^^J   ONUS'S 

si 

3 -J 
ess 

- 

ScSgJSS, 

SSfgS 

1  55SS 

3S;5,!fS 

CO  Son  Si  <o 

NO 



' '?' ' 



3  '  o33 

^,^,  , 

2 

, ,?, 





S 

es 

- 

SSS153 

3;;^S,3;S 

»S5    S 

S5S8~ 

ssa 

sssiq^ 

S    SS8S 

S&^£S 

ss?s 

»s 

*" 

'~*  "^          *"* 

..... 

.  .  . 

o        ..  .. 

0..0. 

.  .  o  . 

..  o  .. 

• 

' 

IIS§S 

-^asa™ 

33,3  '  3 

^ixs 

Sisal 

ge?25 

SSSsS 

5 

Is 

si 

^ 

O^e-^cs* 

KS-JSS 

,^<v^«. 

..        . 

RS     S^ 

E1S>KS5 

^"? ,  , 

,'5>°.^° 

I?^Ku\3 

■?    ,     ,   ^*? 

o  o 

3  O  O   O   O 

o  oo  o  o 

o  o  o  oo 

..           o 

o  o      o  o 

ooo  oo 

1 

~ 

SsESS 

333SI 

S3    s 

8     '  '  S 

?^  S5 

SJ^^J^  J 

SS 

sasa 

3S»3S 

§        !S| 

•s 

- 

i 

c 

l-s  ill 

5 
1 

Ills5 

11  III 

i 
i 

•Isl 

i 

1    s 

*  "   „ 

5  Stit 

1 

t3    u    a    3     -  O     - 

a  S  a  5  S  i;  3 

|£3gt-3s 

•lis? 

2 '"  °  s  !^ 

•^    1  s 
.3   1.; 

y  i|3 

S 

&  a 

lli 
Ml 

3 
1 

111 

11 


I  ?  S  ?  8 

5      5  2  3  * 


i  .  -sa 


'•2   8°    ^ 
St  I ^    3  S 

s^  ':  ^1 


11  'J 


«.  I 


3  53 


n, 
F. 
n. 

he 
id 
ill 

2d 
d- 
er 

>y 

as 

ee 
or 
he 
n- 
at 
a 


*2 


t- 


a  I  ,  ■; 
P  a  5  3 


i  1  ^ 

H   3   " 


1 

1= 

!= 



Cort  of 
new  wooden 
croee  tie 
renewal e 

per 
thoueend 
equated 
groee 
tcn- 
mUee 

o 

l??'?*^ 

S3?S,« 

51132 

"SSlS^C 

"--• 

52^p 

32 

SSSS^S 

nJSKS; 

2  g^f^  tN  o 

5S1 

3112 

IrA: 

^SKS!« 

I 

1 

^«i  UM»  oc 

J 

^ 

sIpIS 

ill 

3i^SS;» 

as 
IS 

2  165  231 
5  999  031 
7  023  905 
5  554  630 

fil 

iii 

iiii 

03  ^CD 

|SSSS 

5yass 

ojm<o  i-S^ 

Per  cent 

crooe   tie 
renQwale 

all  tlee 
in  tracka 

» 

■^T^-^T 

-cx-^^^s 

^o^,,.„ 

r<^0^ 

tf^  i/^  .-, --loo 

IN,    IM 

'^'?"?'^'; 

;7^r^ 

1 

n-ooc- 

m""   "^ 

.... 

... 

OJ   »..<M    ^rH 

o-o^ 

'"■'"'-* 

""^■"3 

S"'-':::^ 

00.- 

Coot  of 
naw  wooden 

renewals 

per 

mile  of 

maintained 

track 

- 

Sss"^ 

JSgSS 

5f»^2 

S5S33' 

S~S5 ' 

CM   MCM. 

ss 

3S333 

-35S 

3=3- 

-si 

I-3I 

jHsg 

alasl 

0  u>(r.,H  CM 

asass; 

sgsss 

S531S 

g£3 

Xeiubted 
average 
coot  per 

wooden 

tie 

^ 

3535S, 

EJSSSiS 

?S^3« 

5?RS3S 

sac:;? 

sss^s 

oS 

»JSS3 

SS2;3S; 

?«S!, 

~"^? 

3.3g5 

05,33 

SSSKS 

.,-0<M^ 

S¥S1 

o^-.^-, 

rH    rH  rH   rH 

.. 

^   O   -H-I.H 

r^-.^ 

rf^^   O   -1 

O^^-H^ 

0-100^ 

O-H-HO- 

Number  of 
new  wooden 
croee  ties 
laid  In 
replace- 
ment   per 
mile   of 
maintained 
track 

^ 

ssss;^ 

3S*S? 

"§3^3 

-H  (r^co  *eo  CM 

53*5' 

"2°s5 

rA  rH 

"»S°S 

s^ss^ 

"55 

oo  fojoS 

SS3IS 

SS"ss 

J33SS 

^SS°s 

sa°SS 

ssg 

Total 
number  of 
new  wooden 
croee  tlea 

laid   in 

replacement 

1939 

' 

iiSsiS 

ssg^s 

y'^i^o^ 

I5£?s 

Sa 

K5?SS 

gas 

OS  CM  ffvrnON 

.H  CJ  vO  e--* 

§S5?s 

Is5 

Average 

number  of 
cross   tlea 
per 
mile    of 
maintained 
track 

- 

!!!!! 

o  w  ™  ^  ^ 

sSsIl 

aSSsSS 

Ss5§s 

!!!!! 

gs 

!!!!! 

!!!!! 

!!!!! 

gss 

s§SS 

ssgja 

Sidil 

SSSai 

38&»23s3s3 

IhS 

~ 

i?as3 

H  O  O  .»  vfl 

5a  ~g? 

;3sssc^ 

Ss^SsS 

s^HS 

m 

si 

idiif 

mil 

m 

§51 

Mil 

isiEi 

S?££g 

pill 

"°°^s 

0  IJ^*« 

--'' 

1 

L_ 

1 

Til 

t 

S 

ll 
it  §  % 

Si"''. 

11  e  J  g 

1 
1 

i 

ill! 

s  t!  a  s  a 

lls§l 

ll 
alt 

mil 

1        1 

C         M  f  >■ 

1  £  si  S  2 

1 

SI 

1 

i 

1      t! 

its 
lilt 
■s « *  a  ■a 

s 

s 

1 
.s    1 

lllll 

i 
1.  S 

s  si 
sll 

5 

1 

||l  ff 

i 

«1 

III  11 

A 
as 

1: 

2!   5 
1 1 1 5  i 

1    f  e « 

11 

ilili 

1  i 

Hi 

57 


n, 
F. 
n. 

he 
\d 
ill 

3d 
d- 
er 

as 

ee 

or 
he 
fl- 
at 
a 


V- 

i2 


t- 


I  s;  1 
lit 

Q        rH         ^ 

a  T  I 


a  I  I  3 


11 


JO    u  - 


I.So3! 


1^1 s  ^3 : 


;-8  S£  . 
ft  III 


5  g'a  S" 

lit"" 


111: 


h  '^  X  p  fl 


i   ffl    S   m  1 


1  S  S| 


E  S 

as  • 


s^a"   J! 

.,'S>,-S    -d 


n, 
F. 
n. 

he 
id 
ill 

2d 

d- 
er 

>y 

as 

ee 
or 
he 
n- 
at 
a 


t- 


■1  1 


is 


0*5 
I    °  I 


3  I  a 


11 
s  : 

Si 


ii 

&   E 
°    I 


55 
s  ■** 

8 

If 

-COC^  ^  "N 

„              Qjj^Q         ^ 

,,^_ 

.„J 

™.„.„.J 

-• 

0 1^* 

-0  /^P-  CM   '* 

fg  -H  CM  01  ,- 

"'~°"° 

CM^OO 

'"'*^'""" 

s 

rO^^tO  t- 

^0^-u> 

„,<^,^,^ 

^0^^^ 

30  H  t-O  t^ 

UM^~1^ 

0  c.i~ 

-.oo*t-o- 

OJ    t-C»   CM   ,4 

»eO  CM 

s:^^:- 

-" 

(M  U\CM  e- 

irv-BtA 

CN    U\^P.i   ^ 

-M   •*   rn^O  fN 

CM    tCCM»l„ 

0-I>c^ 

"""■"■^•* 

cA.;c^,i,5 

=  .^-0,0 

3-,-,w- 

"■'- 

2 

^^<^,^<0 

0   r-)   -*    0   CSI 

t-  000  ■*  0 

^^  *^  e^o 

VN«>^^0 

H«o. 

ir\Oeo   r^CO 

.J-c^O 

"SJS 

»   '■ICO   CM    <t 

coci-o.. 

^.o-oco 

.Or-_J 

°"""'' 

■^a™""^ 

^  '1  .0  ^N  .'■ 

^   CM   l/^r^a3 

^^^   ^"' 

CMCOCMC,, 

H«  -1 

-"""'°-' 

'■"'*■"■' 

""""^- 

"---'-; 

ii.; 

5 

252"  2 

s;2S52 

rA  tC  'Acg  *t 

^^Aji^S 

O^-J^J!,^ 

^>-5u^^™ 

j.4S2a 

:j:^n:^ 

sss;^:^ 

23S 

CM  ^  oe^ 

S2J3" 

371":; 

i^-l- 

2T4P 

il-cS 

S 

ilSHS 

!;IiS"" 

r-oo   H  ^   0 

^^-^^ 

:^2^:j5 

H 

T^r^t 

s;-:^2j 

S^2 

%221 

^S"3" 

:533:; 

l:-!:^: 

3J4SS 

r4n: 

25;^ 

s 

^o..O-iu> 

0~^->./v 

^^^^* 

■*     rHCOOO  "1 

v^«,--1«, 

o.^.NO-' 

»«.,.ir. 

»~f-a,ro 

»<M«.-a> 

0  »o.»  - 

00    0    CO 

^322 

25J5j 

i'Xl'S'i 

2n".i 

P^^^ 

».J)cp 

^'■"^"^'^ 

UNOJltMr^ 

mto^mi 

.J    -1«H~ 

~i^,^™„ 

""^"^3 

■"""■* 

^'""'"" 

"'-""' 

^r-^- 

i 

II 

1 
1 

It 

w*"* 

rH   <M    ■* 

3SS3° 

S'SgSJ. 

"3§3S 

»3|s;g 

SJg 

S3§^3 

■35=1 

sags'? 

"SS 

SRSg 

35Sss 

SI?"? 

SS3SS 

S23s: 

3SS 

tr» 

«    W   ^    M   CM 

SSKS3 

s5533 

^ssss 

'*23s 

S5s 

gs3»2 

23SSS 

asidss 

^ia 

3 '51 

53S39 

•s« 

IsSss 

sggss 

353SS 

=S3 

5 

gyjss 

SSSKS 

s^SSs 

rH   r^  H  rH 

3SK3S 

123 

e^oS^iS 

SsSS' 

ggss^ 

g^H 

^Sss3 

S5 

5Ss 

233-s 

S5SS1 

SsSsa 

5I3 

5' 

Igsss 

259^^ 

sgsss 

f^CM   ,H  -^ 

~2a3? 

3,3s 

^ssss 

33533 

rtgSSS 

r^   CM   fM 

s?ss 

sssS" 

3K 

ssg 

§5S3s 

SSSSI 

siS 

gg;3^K 

S»?53 

<B2^ 

S33g^ 

mrH  H  rH 

^-3S3§ 

SS5 

||SSS 

rtcMCMOco 

assss 

SS| 

^'ss 

S353S 

§3 

!■§§ 

-SS^S 

5532? 

SRS35t 

»   H   ^^   ^   •♦ 

5SS 

s 

SSg^S 

^sgsg 

3^32° 

S3s-- 

sags; 

SSS'S 

SSs 

^ssss 

Sg£S,3 

3SE 

«"3» 

S35S; 

ss 

SKS 

3S3*3 

gssg? 

S3SSS 

sH 

1 

sl 
>;; 

J 

^1 

S^S§° 

~Ss-- 

-08SS 

5SKS3 

=3..| 

SS^iAS 

SdS, 

^^  ^^   ^ 

»SM= 

2?£SS 

-s 

g'SSS 

3325= 

233^  S 

5SS"s 

CM  rH  r^rH  CM 

35aSSlS» 

s 

^SSSS 

ss?s? 

"§?^2 

^  ss  ^s 

!XgSS5 

..g.g 

S^2 

»s,ses 

assgjg 

S3SS3 

~S5 

»-§s 

35233 

H-IS 

JaaSS 

£SS2a 

s«"SS 

3  S3 

s 

gSg&K 

ss»°^ 

gSSK§ 

SSSSR 

SSS3S 

rH         CM 

s33 

3-^53 

ssa^s 

sss^. 

-B^ 

sssg 

35S35 

3  3"»S 

''Ss's 

SsSSs 

gS^RS 

5^1 

Si 

§§35' 

3Ss"' 

3sl°S 

3  "s.?*^ 

"33^3 

KJ?gf!^ 

SSS 

S3S-- 

«^S^5^ 

5SSRS 

-53 

S3SS 

SssSs 

35SSS 

Ssis"? 

5HS3S 

s33Ss 

l§S 

s 

1^3?' 

S^S"" 

3^^H2 

SSSKS 

COCO  ^  CM  * 

rtS(3rtg 

sSI 

sssse 

SSSdS 

!R§K:S5I 

'S3 

-^^•sl 

SSSfs 

aS5«s 

ggsas 

32535 

5351^ 

3»S 

s 

gssss 

3S3-S 

SsS^S 

3^555 

SK3;iS 

3Sg!!g 

3  *  ff? 

S^S's 

JSKSS 

^3K?S 

°SS 

2S^g 

S33S? 

SHsas 

2§S?=S 

aSss? 

S'S^s 

sss 

1 

i 

lis 

m 

s  5  «  a  3 
«« sss 

till] 

1 

I3III 

i 

1 

nil 

Usss 

i  ill 

0    MC3  J  J 

•s 

.  it 

0  ^ 

EPS 

lis 
Sal 

i 
1 

e      11 
i   is  = 

"-  i  §  -a  s, 

Its 

Hill 

1 
1 

J|s|| 

1 
S     t 

"is 

Hi 

i 

i 

i 

°  %  -i 

i 
1 

1355: 

i 

0, 

■&l°   1 

■as  iSi 
sss'Ss 

1 
c 
^    ."I 

a  ,i «  5 1 

1   |3,j 

1 

il 
lie 

= .-  g  cs ' 

- ;:  .5  M  E 

of  i 

i 


•ip 


the 
ind 
all 

ted 
id- 
ver 
by 


tee 
for 
the 


142 

bt- 


s 

i  : 

'  I 

.3  3 


V; 


i  i  « 

o  ^   5 


"■Hi: 


S  s  = 


s  ^ 


?.5 

C-.  WSVsoD  f^ 

== 

1 

j 

'^S'^3~° 

^A4AA 

■'^"^'^ 

— --^s 

-  ---- 

-'^"^ 

^^O^J 

SJ.Sl 

S5 

g 

r^rnco  e^.o 

3^3'^^ 

t^44^^ 

2214'S, 

3:^:^23 

SSS"^ 

"    ',23 S 

Sli^SS 

23;255 

:^^5:j 

ss 

Sa 

9^ 

o^,-,o 

li-^U^^   ^O   rO 

.JCOO^OJ^ 

^,H^o 

^^-i-»<>. 

^       ./^H«>,- 

UN^,-„H 

a>  OCO  -Nr^ 

0.= 

1 

"    " 

.OH  WN^CO 

H         -,,-.0,. 

'^■*   ^°°  "^ 

jJ,OUX«U- 

^   ir\^   ,^^ 

•"" 

2 

O  OnO  -*  o 

inp 

~D\^-4  A\^ 

S444S 

'a'^'' 

'^;:3-^'^a 

:^  ^S5J 

jns3 

^.A^^o 

S11S2 

S3 

s 

»^^^^ 

O   r-l   CM   ^   lA 

<^0  (/Nf'lH 

0  ^^^^ 

.^„oo~ 

-*        ^=^c-^ 

^^„^„ 

^^^^^ 

' 

-^ 

f-^-^^- 

^   ^    (>J  ITN 

'  s™'*^ 

""■^S™ 

rtl         OJ  ro(N  rn 

■"'"'-"'" 

3'^-°--" 

"-^'■^^ 

tr>t^ 

^.-^».» 

^  r^r^txy   O 

^^<M^~, 

CMO».~l, 

^^^^^ 

e-         ^   U>fy  m 

^^^„^ 

~,OOH» 

0H,0«, 

3          2  *~ 

■^-o-^o  -* 

to  ^ ftlM  ^ 

^  >H  »  IM 

""-'33 

.H         "1f->c^  f-i 

"'"'""'' 

-*'--'■' 

CMCMCMCO^ 

int^ 

• 

• 

II 

:i 

J^StoEIS 

S3233 

52333 

^553S 

-H  0  ^  5^ 

s,  ogl2 

0  fOO  ^0 

55?  3  s 

s« 

S 

|»i3H 

§sSSs 

S3  Hi 

53a53 

"5352I35SS 

S    Sgrtg 

5S52^ 

SB  s  s  S 

H  ^H  h2 

IS 

5 

2ISS- 

3^353 

sssgs 

ss^a- 

sss?a 

3SS3s 

°   325§ 

sysss 

?3£'?^ 

sSS^S 

|S 

J! 

^ 

s»ss^ 

i?Kj  ;5^3 

{^?c5S  S, 

S'gsas 

S3SS5 

5^     SSSJ' 

3  5SS«S 

H^ov.0,^ 

33 

i^ 

^osi   ^   ^   ^ 

r-<   rH   H    r-t   r^ 

M  l^         H 

H   lArH    f>J   "^ 

H   H   H  H 

H    H   OJ    rH    OJ 

■s^ 

3   3  IN   1^!3 

SAZ^S 

0  (^  ^SR 

^S 

i- 

^^^^^ 

■^  "^         H 

H   H   CM    H     -t 

^ 

tr^f^oj  oi 

^^ 

0^^^^ 

SSSS'SS 

SgSKS 

,Ot-<^^ 

1 

■^a:?ss 

- 

jJ^CM^ 

tl? 

3S?&g 

:3£S5S 

ss:s?;si 

3K 

saass 

S35SS 

1 

IfN    S 

*-« 

2^ 

SKSaa 

£S2\S1S 

Kjs!;?rt3 

rtSKSS 

SSlSSS 

^JQ»{j^g;^ 

£    3;5Kl? 

H  ?^  HTO 

rtSSSS 

^SSSS;:! 

S!f 

8-a 

s 

C'J    M   r-»   '-^^ 

(M  H          f-1 

^^^^ 

^^^^^ 

RSSSS 

=o 

35KSS 

g~SS.33 

^  3532 

^^,^ 

JJ^H-lO 

„^^^^ 

3» 

8^ 

^   .H    ,-1   rH 

"OH   c 

■^        H  CM  H 

HHH          ^ 

?S^SS 

SSslKS 

ssass 

sscss 

■vo-at^-o 

OlA^u. 

^ 

^Q    fMOJ    ^ 

fi 

s? 
"S 

!^ 

2SSS- 

nn^~rt,„ 

oKSiSS 

3S^8S 

£SRSd 

^         r-OsrHO. 

§3S^3 

ss33s 

S?:si&s 

sa 

J 

C\i  ^r^    -t    f>J 

■^ 

S^Ss^ 

oSSjS 

-oo-^oo 

^   UN^CS,^ 

^sr.s 

^^ 

^C/NOJ    C~   ^ 

SS 

5 

3n'"a3 

:?f^^:?'~ 

rH 

33SS;" 

SJhSIhSI 

1     S 

; 

i 

1 

I 

-la 

lllfl 
fill's"; 

If  I  95 

li  1 

1  «   ^« 

mil 

II  ill 

i 

E- 

1 

11  HI 

3  s  .3 .3  5 

3 

i 

1 

B 
1 

l3lsl= 
^  1 "'  "^ "  " 

E        1 

1      s 

11:1 

1 
.i    II 

iiili 

3  a  1 3  5 

s 
1  -i  " "'  = 

§ 

II2 

.'='3 

ill 
l|f 

III 

11 


15  re 


3- 


g  i1 


^t"  .-■3  =" 
3  5'^  1' I  '.  ■? 


Ties  487 


Report  on  Assignment  5 

Investigate  and  Report  on  the  Dimensions  of  Ties,  and  Bring  up 
to  Date  the  Information  in  the  1924  and  1932  Proceedings 

W.  J.  Burton,  (chairman,  subcommittee),  W.  C.  Bolin,  W.  H.  Brameld,  H.  F.  Brown, 
S.  B.  Clement,  R.  L.  Cook,  W.  R.  Gillam,  C.  T.  Jackson,  J.  E.  Lockhart,  A.  F. 
Maischaider,  E.  F.  Salisbury,  W.  D.  Simpson,  Raymond  Swenk,  Sverre  Thorvaldson. 

The  following  report  substantially  completes  the  work  on  this  assignment,  and  the 
recommendations  at  its  conclusion  are  submitted  with  a  view  to  their  adoption  and 
inclusion  in  the  Manual  in  1942.  Consideration  of  the  proposals  during  1941  by  all 
concerned  is  desired. 

At  the  1939  convention,  in  response  to  this  assignment,  your  committee  reported 
on  the  present  practice  as  to  tie  length  and  discussed  the  tie  functions  from  the  stand- 
point of  length.  The  report  embodied  the  conclusion  that  an  increase  in  supporting  power 
of  the  roadway  could  be  obtained  by  an  increase  in  tie  length  at  less  expense  than  by 
other  means  and  that  considering  cost,  8^ -ft.  ties  were  a  better  buy  than  8-ft.  ties,  as 
the  longer  ties  will  give  added  support  out  of  proportion  to  the  added  tie  cost. 

At  the  1940  convention,  and  in  response  to  the  same  assignment,  your  committee 
presented  resumes  of  the  1924  and  1932  Proceedings  and  also  a  tabulation,  complete  for 
the  Class  I  railroads  of  the  United  States  and  the  principal  Canadian  roads,  giving  the 
percentages  purchased  of  each  standard  size  and  length  of  crossties.  This  report  in- 
cluded a  discussion  of  the  present  practices,  especially  as  to  length,  pointing  out  that 
precedent,  rather  than  effective  service,  appeared  to  govern  choice  of  length  to  a 
considerable  extent,  at  least  in  certain  regions. 

Recommendations 

Based  upon  the  studies  and  data  mentioned  above,  your  committee  offers  the  follow- 
ing recommendations  for  comment  and  criticism,  with  a  view  to  their  submission  in  1942 
for  adoption  and  publication  in  the  Manual; 

(a)  The  adoption  of  nine-foot  ties  and  the  discontinuance  of  the  purchase  of  eight- 
foot  ties  as  rapidly  as  practicable  and  economical. 

(b)  The  use  of  nine-foot  ties  at  least  for  lines  of  heavy  traffic. 

(c)  The  adoption  of  the  nine-foot  length  whenever  change  is  made  from  the  eight- 
foot  length. 


Report  of  Committee   17 — Wood   Preservation 


H.   R.   DtJNCAN, 

Chairman, 
W.  P.  Arnold 
W.  G.  Atwood 
s.  j.  buckman 
Walter  Buehxer 
C.  S.  Burt 
G.  B.  Campbell 
W.  F.  Clapp 
H.  R.  Condon 
E.  A.  Craft 
John  Foley 


E.  B.  FuLKs 
W.  R.  Goodwin 
L.  H.  Harper 
L.  B.  Holt 

H.   E.   HORROCKS 
R.   S.   HUBLEY 

R.  P.  Hughes 
M.  F.  Jaeger 
A.  L.  Kammerer 
Edward  Kelly 
A.  M.  Knowles 
A.  J.  Loom 


R.  S.  Belcher, 

Vice-Chairman, 
L.  J.  Reiser* 

F.  B.  Robins 
Henry  Schmitz 
L.  B.  Shipley 

O.  C.  Steinmayer 

G.  C.  Stephenson 
T.  H.  Strate 

W.  A.  Summerhays 
J.  E.  Tiedt 

Hermann  von  Schrenk 
Committee 


Died  June  S,   1940. 


To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  assignments: 

1.  Revision  of  Manual. 
No  report. 

2.  Service  test  records  for  treated  ties. 

Progress  report — ^submitted  as  information  page  490 

3.  Piling  used  for  marine  construction. 

Progress  report — submitted  as  information page  508 

4.  Effect  of  preservation  treatment  by   use  of — (a)  Creosote  and  Petroleum,  and 
(b)  Zinc  Chloride  and  Petroleum. 

No  report. 

5.  Destruction  by  termites  and  possible  ways  of  prevention. 

Progress  report — submitted  as  information  page  513 

6.  Revision  of  specifications  for  the  treatment  of  Douglas  fir. 
No  report. 

7.  Incising  of  all   forest  products  material,   collaborating  with   Committee  3   Ties. 
No  report. 

8.  Investigations  being  made  for  the  determination  of  toxicity  value  of  creosote  and 
creosote  mixtures. 

No  report. 

9.  Present  practice  as  to  preservative  used. 
No  report. 

The  Committee  on  Wood  Preservation, 

H.  R.  Duncan,  Chairman. 


Bulletin  423,   February,    1941. 


489 


490 


Wood   Preservation 


Ctarlcs;  Jfinlep  Jforb 


Charles  Finley  Ford  was  born  at  Morrisonville, 
111.,  on  December  17,  1869,  and  moved  to  Cameron, 
Mo.,  in  1878.  He  entered  the  service  of  the  Chicago, 
Rock  Island  &  Pacific  Railway  on  May  1,  1886,  and 
spent  his  entire  professional  life  with  that  company, 
until  his  death  on  June  9,   1940. 

Following  his  first  employment  as  water  boy  on 
construction  his  personality  and  outstanding  abilities 
were  recognized  by  successive  promotions  to  road- 
master's  clerk,  maintenance  clerk,  chief  clerk  to  general 
roadmaster,  chief  clerk  to  engineer  maintenance  of  way 
system,  and  chief  clerk  to  general  manager. 

On  November  11,  1907,  he  was  appointed  assistant 
to    engineer    maintenance    of    way,    with    supervision 
over   tie  inspection  and  distribution,  and  on  April  27, 
1911,  he  was  appointed  supervisor  tie  and  timber,  with  jurisdiction  over  timber  preserva- 
tion, which  position  he  held  at  the  time  of  his  death,  June  9,  1940,  having  completed 
more  than  54  years'  continuous  service  with  the  Rock  Island  Lines. 

Mr.  Ford  was  an  active  member  of  Committees  3 — ^Ties,  and  17 — ^Wood  Preserva- 
tion. He  served  as  vice-chairman  of  the  latter  during  1926-1935  and  as  chairman,  from 
1935  to  the  time  of  his  death.  Mr.  Ford  was  also  an  active  member  of  the  American 
Wood-Preservers'  Association  and  served  as  a  member  of  the  Executive  committee  and 
as  second  vice-president,  first  vice-president,  and  president  of  that  association  during 
the  period  1922  to  1926,  inclusive. 

He  served  on  various  committees  of  both  organizations  and  gave  unsparingly  of 
his  time  and  experience  to  the  furtherance  of  the  activities  of  these  associations,  and 
was  widely  known  in  his  profession  among  the  railroads  and  wood-preserving  companies 
of  this  country. 

A  man  of  broad  experience,  keen  judgment,  fairness  and  kindliness  in  his  dealings, 
Mr.  Ford  endeared  himself  to  all  with  whom  he  came  in  contact.  A  sense  of  personal 
loss  has  been  felt  by  his  associates  who  remain  to  mourn  the  loss  of  a  kind  friend  and 
lovable  companion. 


Report  on  Assignment  2 
Service  Test  Records  for  Treated  Ties 


A.  J.  Loom  (chairman,  subcommittee),  G.  B.  Campbell,  W.  R.  Goodwin,  L.  H.  Harper, 
L.  B.  Holt,  R.  S.  Hubley,  R.  P.  Hughes,  M.  F.  Jaeger,  Edward  Kelly,  T.  H.  Strata, 
W.  A.  Summerhays. 

The  table  of  tie  renewals  per  mile  maintained  on  various  roads  has  been  revised  to 
include  data  for  1939. 

Reports  of  special  test  tracks  are  submitted  for  the  following  roads: 

Baltimore  &  Ohio 

Chicago,  Burlington  &  Quincy 


Wood   Preservation 


491 


City  of  Minneapolis  Filtration  Plant  Railway 
Northern  Pacific 


A. 

'/ 

Y£A/f 

MIL 

I 

/9// 

14  Z 

/  2. 

14  9 

1 

/3 

ISI) 

\ 

/■^ 

ise 

1 

/S 

IS-9 

1 

/6 

/SIS': 

IV 

I6Z 

/a 

16^ 

/9 

ie6\ 

/3ZO 

fes6 

2  / 

169 

zz 

I70t 

Z3 

174--. 

Z^ 

/77S 

ZS 

ia/3 

Z6 

IBSi 

27 

1792 

2.a 

I8ZI 

2.S) 

130* 

/930 

I93i 

31 

I9e< 

JZ 

I96i 

55 

/95C 

34 

/<)40 

I3i5 

1934 

U 

I95Z 

37 

190 

Zt 

I3S6 

S9 

1^49 

1940 

'^i'i'riilt.t 

JO 

^    19 

/s 

m  TfAcx 

/9 

I: 

ratory 
licago, 
jervice 


lerring 

aainder 
irtment 

tes   the 
service 


various 
treated 


-,  1914. 
twenty - 

ed  over 

doubt, 

;,    July, 

t.  Track 
ck  from 
1.  Track 


473  ties, 
ley  were 


removed  from  track.  The  destruction  effect  of  these  derailments  on  the  remainder  will 
be  given  consideration  when  the  ties  are  removed.  There  have  also  been  117  ties  removed 
because  of  switch  installations. 


CJfOSS 

7-/C     RENEWALS     PED     MILE      OF     ALL       TaACtf     M/HNTAINE  D     /ail-ISaO 

,„.,^„^-,.y«       j 

^       -     - 

1 

= 

E 

E 

^ 

"s 

= 

_ 

1 

y 

h45f- 

'■1  -r;'. 

It.---    -       ^: 

7 

i 

i; 

-4ilt*; 

is 

f\ 

3i 

i 

^ 

i 

8 

a 

M 

-i 

1 

^ 

1 

t 

i 

1 

i 

1 

E 

E 

^ 

E 

E 

S 

=5!= 

~¥r- 

dp 

1 

B--^^ 
r  -.=^ 

^ 

' * 

^ 

^ 

^= 

"iS 

= 

E 

1 

1 

» 

1? 

i 
i 

= 

1 
B 
1 

= 

= 

77 

i 

1 

1 

t 
1 

= 

1 

i 

J 

1 

^ 

= 

1 

E 

— 

1 

i 

e| 

- 

^ 

= 

I 

1 

= 

E 

1 

— 

1 

ia 



1 

i 

^ 
^ 
^ 

i 

E 

i 

— 1 

- 

E 

= 
E 

1 
1 

s 

isos 

E 

M 
1 
n 
# 

E 

i 

— 

1 

= 

E 

1 
1 

j 

1 

¥ 

e: 

1 

s: 

^ 

E 

i 

^ 

= 

1 

^ 

E 

1 

^ 

= 

^ 

= 

Wood   Preservation  491 


City  of  Minneapolis  Filtration  Plant  Railway 

Northern  Pacific 

Southern 

(Inspection  reports  for  1940  are  submitted  by  the  U.  S.  Forest  Products  Laboratory 
covering  the  Hartford,  Fair  Grounds,  and  University  Avenue  test  tracks  of  the  Chicago, 
Milwaukee,  St.  Paul  &  Pacific,  also  experimental  ties  in  tracks  of  the  Public  Service 
Company  of  Indiana.) 


The  report  is  presented  as  information. 

Baltimore   &    Ohio 

Herring  Run  Tie  Test 

Annual  Report — 1939,  End  of  25  Years'  Service 

Introductory 

The  Herring  Run  test  tie  section  is  located  in  the  eastward  main  track  at  Herring 
Run,  Md.,  on  the  Baltimore  division,  about  seven  miles  east  of  Baltimore,  Md. 

Eighty-five  percent  of  the  test  was  installed  in  November,  1914,  and  the  remainder 
in  August,  1915,  in  cooperation  with  the  Forest  Service  of  the  United  States  Department 
of  Agriculture. 

The  development  to  date,  as  set  forth  in  the  accompanying  report,  indicates  the 
total  service  fife  of  the  untreated  ties  and  the  trend  of  what  is  to  be  expected  in  service 
life  from  the  treated. 

Purpose  of  Test 

The  purpose  of  the  Herring  Run  test  is  to  determine  the  economic  value  of  various 
kinds  of  preservative  treatments,  and  incidentally,  to  note  the  life  of  red  oak  treated 
ties  compared  with  red  oak  ties  untreated. 

Conditions  of  Test 

(1)  Time.  All  ties  in  test  except  Section  14  were  installed  in  November,  1914. 
Section  14  was  placed  in  August,  1915.  Test,  therefore,  is  now  completing  its  twenty- 
fifth  year. 

(2)  Traffic.  An  average  of  16,204,000  gross  tons  per  year  has  been  handled  over 
this  track. 

(3)  Rainfall.  The  average  annual  rainfall  has  been  41.7  in.  This  is,  no  doubt, 
sufficient  to  have  caused  leaching  of  soluble  preservatives. 

(4)  Temperature.  Mean  average,  January,  35.8  deg.  F.,  mean  average,  July, 
77.8  deg.  F.  Extremes,  8.8  deg.  F.  to  99.5  deg.  F. 

(5)  Maintenance.  Maintenance  conditions  have  been  uniform  over  entire  test.  Track 
on  entire  test  raised  and  ties  respaced  for  39-ft.  rails  during  summer  of  1926.  Track  from 
tie  0  to  tie  1916  is  pick-tamped,  from  1916  to  east  end  of  test,  machine-tamped.  Track 
on  entire  test  raised  in  1929,  1933  and  1936  and  machine-tamped. 

Derailments 

Four  derailments  have  occurred  within  the  limits  of  the  test,  damaging  2,473  ties, 
or  70  percent  of  the  total.  Of  this  number,  121  were  so  badly  damaged  that  they  were 
removed  from  track.  The  destruction  effect  of  these  derailments  on  the  remainder  will 
be  given  consideration  when  the  ties  are  removed.  There  have  also  been  117  ties  removed 
because  of  switch  installations. 


492 


Wood   Preservation 


Jr.       dj       ffl  * 

s.i2*'Sa>       in  W5  <o  »H  t>  t- ii5  !D  u5  •^     eo     ;o  eo 


tfi^ 


0)  C 


Oti<o u^oM  wc^  o  w o     o     coo 

O  OS  ^  05  t>  O^  05  05  Oi  ^  O        O        05  O 


050  WCO  IC05  cox -^05  O        O        CO  00        Ti 

00  CO  0>  00  M -^ -"f  •^  ■^  05  O   o   0000 

N  "H  iH  N  N  tH  rt  ,H  rH  rH  CO   CO    M  IN    g 


!fi  r--"ij  05'H'^oooooo'-iO 

f,         a^    MrtlMP5C0rtrHrtr-lNC0 


"  a^  ®  ooooooooooinO      o     oo 
E-i.2>^  Ncocococort rHrt ,-tN50     CO     coco 


Hg 


fes 


.    .  o  u  u  o 


_J  a; 

O    O  4J  .4J  +J  +J 


oo->taiiococ-o>HOoo 


O  o  ■ 

c  a  ' 

•   . 

OS  l>  •■ 

loeoi 
o©< 


I  it  tc 

>  e  a 


u  u  u  u  u 
^  »^  u  ^  ^ 

rt  rt  w  rt  C4 ' 


60  b£  Cit  M  60  O 


ooooooooo  oo 
ooooocooicor2oo 
eocoo»(Miocoooo5i-i^Ti"t- 

iHrHi-lrHr-l(MQeqeq 


.-I  ,-1  ,-1  r-l  ^  O  N  M       IN       eo 


0)^       wNco-^  vococ-oooiO  i-hm 


E^      S 


s    ^ 


O   U      I 


Wood    Preservation 


493 


The  indications  are  that  the  life  of  many  ties  in  this  test  has  been  and  will  continue 
to  be  materially  reduced  as  a  result  of  decay  starting  in  the  crushed  fibers  of  the  wood 
marked  by  derailed  wheels.  Attention  is  directed  to  the  fact  that  all  groups  in  the  test, 
excepting  Section  5  of  the  straight  creosote  group,  have  suffered  more  or  less  from  wheel 
marks  at  various  times.  For  this  reason  the  test  still  retains  an  important  value  as  a 
basis  for  a  comparison  of  the  effectiveness  of  the  various  methods  of  treatment,  although 
any  conclusions  regarding  the  average  hfe  of  ties  so  treated  must  be  drawn  with  a  proper 
regard  for  the  damage  resulting  from  these  derailments. 


Baltimore  &  Ohio — Tie  Test,  Backus,  Pa. 

Length  of  Test — 29  Years — Report  for  1939  Renewals 
Installed — November  1910 

straight  Creosote — 10  Lb.  Per  Cn.  Ft. 

Ties  In  Removed  to  Date  Av.  life 

Kind  of  wood  placed  test  Number      Per  cent  to  date 

Redoak 72  68  11  16.2  28.0 

Black  oak 260  258  31  12.0  28.2 

Pin  oak 316  315  44  14.0  28.2 

Maple 543  530  49  9.2  28.4 

Beech 824  797  140  17.6  28.0 

Birch 19  17  2  11.8  28.3 

Cherry 9  9  3  33.3  26.6 

Gum 12  11  0  0.0  29.0 

Chestnut 170  170  136  79.6  21.0 

Hickory 146  143  40  28.0  27.6 

Total 2371  2318  456  19.7  27.5 


Average  Life  of  Untreated  Ties  in  Years 

Total  Average 

Kind  placed  years 

Aflh 116  5.1 

Beech 208  5.0 

Red  birch 217  3.6 

Chestnut 259  9 . 7 

Cottonwood 86  2.9 

Cypress 225  8.3 

White  elm 191  5.3 

Hemlock 190  4 . 9 

Hickory 110  5.5 

Loblolly  pine 248  5 . 3 

Hard  maple 122  4.7 

Soft  maple 125  3 . 6 

White  oak 125  11.1 

Red  oak 204  5.3 

Pin  Oak 126  6.3 

Poplar 126  5.3 

Red  gum 152  4.1 

Sycamore 131  3.3 

Tamarack 175  5.1 

Tupelo  gum 136  3.5 

Total  placed 3272  5.6 


Report  of  Thirtieth  Annual  Inspection  of  Chicago,  Burlington  & 
Quincy  Experimental  Ties 

The  results  of  the  1939  inspection  of  the  experimental  ties  in  the  tracks  of  the 
Chicago,  Burlington  &  Quincy  are  given  in  the  accompanying  tabulations.  These  ties 
were  laid  in  1909  and  1910,  some  treated  with  coal-tar  creosote  by  the  full-cell  process, 
with  10  to  12  lb.  per  cu.  ft.;  some  with  zinc  chloride  (Burnett  process)  with  ^  lb.  per 
cu.  ft.;  some  with  a  mixture  of  these  two  preservatives  (Card  process),  with  an  absorp- 
tion of  Yi  lb.  of  zinc  chloride  and  3  lb.  of  creosote  per  cu.  ft.;  and  some  were  untreated. 


494 


Wood    Preservation 


Pi 


5 


_      01      a, 
3  t;  5  Q)  M 


S-2  S  2^ 

I"  ea  1)  OS 


"    O    O   O 
S   E    "    ** 


t~co  00  ^ 
in  t- 1/3  ira 


t-T-l 

rfoo 


ooin  t-in 

OiOO-^t:- 


H    .S 


_         1)  OJ 

3  i)  ta  0)  (« 

*;  0)  0,^  ^ 

^  >>>  o 


1   ?    M   M 

•43  5  J3  2® 

«  ta  a>  us 


+j  -u  ^j 

g  g  c  t.  g 


C   <D   c   >> 

k.  c  S  a) 


t^  CS  W  tH  t^  t~        50 


a  rH  O  «5         ^ 

c^ooosco      3 


iS« 

^t-o-<f 

lOiO«(J> 

0  oj 

Ha 

N 

MOONrH 

a'  3  S   r- 
^  ^  3  C 


5  t<  >-  ti 

b   a  3  C 


lh  ea  3  c: 


1;  ta  PC 


i-  ea  s  c 


Wood   Preservation 


49S 


oaxeeo 


aooe4u3  onoso 


iHWt- W 


coo  wo 


NC-lOio 


o»>Heo« 

05  00  t*  X 

iaiOiOia 

fitOCir^ 

•HIMIOIO 

MTft-eo 

USNiO'* 

oo<o>a 

'-'i-t-t- 

05  W  X  t* 

OrtTf 

t-00t-O» 

eo  i~- T-(  rr 

W(0>0^ 

»-4lOrH'^ 

MrHi-Ht- 

-HW 

■* 

rH 

a 

CO 

d 

04 

t-* 

rtlOrt 

"5  00  05  00 

•-icseo  t- 

MC-lO 

rHC-TflO 

V 

lOOOtOM 

« 

ooN-<i;'j< 

CT;  N  -^Ji  00 

CCHNrH 

^r^aa-v 

U 
0 

X 

ooot--* 

>. 

lOtC-HU3 

^a^ciui 

ft 

•"("O  05  tT 

1 

1 

05  t*  CO  C3 

X 

tot- t-o 

^ 

ino  t-io 

s 

NMr-i 

N.-H^ 

u 
0 

N 

-IN 

0 

MfH  rH 

NNrt 

V 

N^rtrt 

S 

MN'^ 

s 

_iO     1     . 

5 

>a 

ita    1 

I 

la    1    1    I 

"2 

lO          1     1 

2 

1 

00-^    1    1 

'i    1    1    i 

;o 

1TJ<         1 

a 

C-     1     1     1 

lAlA      1      1 

1      1      1      1 

00    1    1    1 

95      i      1      ■ 

Mo     •     1 

1    1    1    1 

e^ 

'IN     1 

S, 

Mill 

NM     1     1 

1      1      1      1 

Nil! 

M     1     ■     > 

pri  to'O-rf 


lONNi-i 


O5>-(00t- 

-^OOlHrt 


„     I  •  S 
o-O  c^ 

k  «  3  a 


*  a  3  c 

OOCQS 


„    I  2  a, 
u  c«  3  a 

oomt3 


S:  c«  3  c 


1,  £:  I.  ■<-> 


„      I  «   41 

£  e«  3  B 

UOPOP 


°T  E*3 

u  M  3  C 

oopa3 


496 


Wood    Preservation 


9 

a 

a 

o 
O 


W2         kT 

5    ^ 


(^ 


u 


p4  M  m  0)  n 


<n  rt  0)  (ua 


fl  «  o  >-i  S 

in  >  :j  0)  s 

g  >  3  c« 

"  o  o  « 

i>  d  u  IV 


H  a 


BM    a    1)    ^ 


CU 


gs  ^  h  I  I* 


H  3>  a  »H  !!! 
2  oJ!  a 


Tjiino^o 


eot-oeo 


0  0>©'«1« 


O 

a 


S  r-IoiT-ieo 

3    NrHr-l 
O 


4)  Tiioit-m 

0   -^siMN 

U 

rHOOOOTf 

3    NMlo'w 

1 

^ 

N 

^ 

iH 

0   NMi-l 

m 

0 

15 

^ 

0, 

lO     1     1 

H 

. 

. 

.      . 

s 

0>T)<        1       1 

1 

1   1 

C-t>     1     1 

MN     1     ' 

' 

1    1 

NN     1     ' 

h  8  «  * 

(2  is-' 


OOOOr-l  0)n<lO» 


5g 

OiNCOr-l 

OtOOiH 

Syntax 

lOOlOrH 

«0  CO  00  00 

0>  WOO 

OOi-tMOO 

WMt-0> 

t-o>t-« 

OrHOOl 

Oi»C-« 

H-E 

i-llO 

CO 

■* 

CO 

r-(00r-l 

■«f 

£  ea  3  C 

oomt2 


O?  Si 
a)  ^^  !3  — 
K  ea  3  0 

OOMP 


S  c«  3  0 


°^  E-w 

SS  e«  3  c 


■■)?!  « 

OTS   O   ^H 
£  S  3  0 


£  0)  3  0 
OOCQP 


Wood   Preservation 


497 


O  3  >  (U  «—   5^ 


o  u 


73  M  2  „  "5   ■*  <51  O  00  CO     • 

c  2  fc  S  • 

feSoS 


e  s  e  >. 


«>3 


b--^ai  '^co 


ft,  o 


5  XS  !:-■<* oi'^OT 


2^   COoiOM'*-* 

g'O  00 .-( oi CJ O) •"! 


C  »  t.  (U  I 

D  >  a;  m  ooo-^oto    I 

C  0)  C  >>  I 

"  g  o  g  <M«ioo»eo    I 

_,  „   WoC^tONOO 
_7,  fj    05«5t--*COt- 

E-i  E  o  "-"^ 


!C^ 

oo;0'«>-i 

5 

■^  ■*  t-  •*  !0  •-< 

o 

ONlOOOOOl 

H 

eio<-iciMio 

1     ."O     1 

i  ',^3 

iJ 

1  ;h^ 

Si 

s 

'Jt 

c  £^'-' 

o 

*"  a 

i  so 

&< 

WC 

)«t) 

498 


Wood    Preservation 


City  of  Minneapolis,  Minn. — Filtration  Plant  Railway- 
by  8  IN.  BY  8  ft.  Red  Oak  Crossties 


-4200 — 6  IN. 


Treated  and  placed  in  fall  of  1916 

Average  absorption  10.08  lb.  per  cu.  ft.  creosote-tar  mixture,  40  per 
cent  M.  of  W.  creosote,  20  per  cent  coke-oven  tar,  and  40  per  cent 
water-gas  tar. 

Analyses 

Treating  Mixture 

40-20-40  M.  of  W.  Coke  oven  Water  gaa 

Actual      Computed  creosote  tar  tar 

Distillation  tol  70  deg.  C 0.9%         

210deg.  C 2.5%           2.2%  0.1%  0.5%  5.2% 

235  deg.  C- 12.8%          12.1%  13.4%  5.7%  14.1% 

315  deg.  C 41.1%         41.5%  51.8%  19.1%  42.4% 

355  deg.  C 56.6%         57.8%  72.1%,  29.0%  58.0% 

Sp.  Gr.  at  380  deg.  C 1.111     Sp.  Gr.  at 

60  deg.  F  1.096  1.207  1.093 

Water 1.8%         0.6%  1.9%  0.2% 

Sp.  Gr.  235  deg.-315  deg.  Fraction— 1.024  at  60  deg.  C/60  deg.  C 

The  city  filtration  engineer  of  Minneapolis,  Arthur  F.  Mellen,  reports  under  date  of 

October  1,  1940,  that  25  of  these  ties  have  been  removed  to  date,  i.  e.,  after  24  years  of 

service. 


Northern  Pacific — Hemlock  Test  Track 
Designated  by  U.  S.  Forest  Service  as  Project  L-214 

1800  Montana-Idaho  Hewed  and  Sawed  Ties  placed  between  Mile 
Post  120  and  Mile  Post  121  +  2350.  Westward  Main  Track,  Missoula. 
Montana. 

Treated  at  Paradise,  Montana  with  80-20  Creosote-Coal  Tar  Solu- 
tion, 6%  pounds  per  cubic  foot.  Lowry  Process,  and  placed  in  track 
in  1910. 

Summary   of  Ties   by    Species 


Ponder- 

Western  Western  Douglas 

True 

White 

oaa 

Year     hemlock 

larch 

fir 

fir 

Spruce 

pine 

pine 

Aspen 

Total 

1910 

1,072 

436 

166 

102 

18 

2 

3 

1 

1,800 

Year 

Renewals 

1917.. _ 

1 

1 

1924... 

1 

1 

1926... 

4 

4 

1928... 

43 

43 

1929... 

26 

8 

6 

14 

5 

•    59 

1932... 

49 

9 

3 

61 

1933... 

28 

8 

4 

1 

1 

42 

1934... 

43 

18 

1 

6 

68 

1935... 

29 

9 

5 

4 

47 

1936... 

42 

11 

3 

1 

1 

58 

1937... 

78 

24 

4 

5 

4 

115 

1938... 

72 

24 

1 

6 

103 

1939... 

42 

16 

3 

4 

1 

66 

1940... 

80 

22 

5 

8 

1 

116 

Total 

538 

149 

32 

49 

14 

1 

1 

0 

784 

Per  cent 

renewed 

50.19 

34.17 

19.28 

48.04 

77, 

.78 

50, 

.00 

33.33 

0 

43.55 

Avg.  yrs. 

per  tie  . 

25.40 

26.32 

25.19 

24.86 

22 

.93 

30, 

.00 

26.00 

0 

25.49 

Six  ties  removed  prior  to  1928  were  broken  by  derailment.  Others  all  removed  account 
decay  hastened  by  damage  from  past  derailments  and  mechanical  attrition  at  rail  base. 

43.55  per  cent  renewals  in  30  years. 

Average  life  of  ties  replaced — 25.49  years. 

Estimated  total  life  based  on  Tie-life  Curve  of  the  United  States  Forest  Products  Labora- 
tory— 33  years. 


Wood    Preservation 


499 


E  ^ 
o 

0)  o 


y  C 


ai5 
♦J" 

_  C 


0.5 


3j  C 


•a  uj 


s!     &?= 


.i  a 

u  o 
as  I. 


-4-* 

c 

— < 

c 

<D  3 

o! 

3-0 

o 

it 

o 

00 

O 

>> 

li 

rt 

cS 

4) 

4-1 

0) 

O 

H 

!h 

i5 

m 

^ 

cs 

U    fr^     t.    U    t4    f-l 

c^  c^  cj  ^  Clj  c^ 
<D  4)  lU  <D  <P  4) 


c  c  c  s  s  c 

cti  cj  cd  cd  cd  7j 
o  o  o  o  u  o 

<1>  (D  0)  tU  0)  0) 

ESSSES 


'CO  'CO  'CO 
4J  4*  <X>  Q^  1>  4J 
t/2  OJ  50  m  33  M 

3  3  3  3  3  3 

oi  7i  ^  ci  d  ^ 
■  o  o  o  o  o  'J 

:a  V  <U  O  <u  i>  <S> 

o  ai  m  Oi  01  11  3i 

C)  ri  aJ  cd  cd  cd  cd 

■O  .CQAA^^ 

••-'  m"  m  aitn^  — SSz; 

3»»«t,ui-t.;,iH 

b^^So3rfc«3!aSc!i 
'^  «  I  S  >.p^?^>,>>>^ 

.-.OOO(l)4;4>4J0)CJ 

hZZZ'O'O'a'O'a'O 

?5  ■»m(MTj<OOM 

^H  00  O  1^  ■**•  t^ 


rH  M  CO  M  » 


z- 


050 


4) 

V 

>':t: 

b. 

U5 

4) 

rt 

rH 

•[^ 

41 

W 

>> 

1 

c 

n 

o 

M 

(11 

? 

■O   1 
4)  >> 

m 

ki 

C  Bi  0 

OXi 

-W 

L. 

crt 

03 

4) 

1-1 

o 

,n 

4_) 

cS 

tw 

n? 

J 

O 

!ti 

3 

-^ 

'O 

•n 

4) 

o 

n;..  03 

>  m  u 


500 


Wood   Preservation 


S  O   00  U5  «D  <-l  00  •*  CO 
t-  g   lO  00  00  N  •<]<  t- 00 


a>  0) 
.o  w^o[-Nco«o 


00  Wi-(r-lN 


01  S 

tSS   0000<St-iO 

.  c4  ujiaooiaooo 


MS  O  O  r-l -^  lO  U5  «0 

(P  M  ,-.,-<  rH  t-H  ,-1  ,-1 -H 

M -tt  0>  0»  05  0>  OS  o>  o> 

"^   2  i-t  iH  iH  T-(  iH  tH  iH 


u 


o  o  o  o  o  o  o 
d  6  d  c)  6  6  o 

0)  0)  (LI  (V  (V  m  V 

^,  bi  b  h  k.  £  i< 

ooooooo 


N  00  00  00  00  00  00°° 

-  K  X  X  X  «7<  X 
CI  0>  05  O^  O^  05  Oi 
XX  X  X  X  X  X 
t- C- t- C- t- t- t- 


M 


WwPMtfWww    2 


■(  N  eo  Tf  lo  «)  t> 


Wood   Preservation 


501 


^ 


09  aj 

Si  >>£3 

o-o  a  i 
So 


w 

OlH 

N<0 

Oh 

tOTjl 

t-w 

loeo 

O05 

t-t- 

o« 

t-tO 

'OOoO-<*00 
I  00  O  o^  Oi  ^  t* 


I000r-I00050      P      1 

I M  ea  ;o  Ti<  o  to  Ti<  00    i    i 


<  rH  eo  N  lo  eo  N  05 


lOOOrHOOrHOOO 


OOOOOOOOOOOoO 
OOOOOCJTfoO'HCOtDMO 

ooa)Oaiasooo;t-'<^Tt 


COM  O  05  05  O  CO  t*  Tj<  W5  00  CO -J  o 


oi  a  ^ 


'^S*2'?"^'^oo500ojooo 


bo  o      ^  ^ 

^■3     :2  3 


3  o  o      aj  -o  13 


^    t-NO00p-C0,-(C05^§J 


C5     S         t* 


&<« 


ei  a 

WW 


1-S  S*J  na-wa^ 


0)  01 
'OT3 

•c-c 

o  o 

33 
u  u 
u  u 

B   □ 


T3Xi 

o  o 

33 

u  u 
u  u 

•C'C 
gg 

S2 


oJS—  °  <-'—  eD  o  OS  o  o 


cU  o  * 


_._.  bn  !>e 

"  "   O.  D.-13  -o 

ss  o)  11  t;  t-s  — 

3333eaea33 


01  (U 
-0T3 

■C-C 
o  o 

33 

u  u—  _,     . 

.S.S  3o^ 

N    N    q    q    o 

oo^^3 

o  o  c  c  C 

^  Oj  »  o  4;  a5<c<C  — 

o  o  p  o  S  ti  "  £■§ 


ES 
>  > 

O   O  J 

O   O  j 


V  V  <v 

■C-CT 

000 


CQ   CO    00 

g  0)  0)  J)J^feNE  e  g 

OUOOmmtJWN 


CSC 


d  CD 

V   01 

c  c 


502 


Wood    Preservation 


U 


^    5 


c« 

u> 

t 

— 

(1) 

< 

11 

a> 

>. 

3 

CI] 

s 

C4 

OJ 

OT3 

C  W 

c 

o 

C  3 

•-H 

3  c« 

>. 

-M 

Tl    '^ 

B 

c« 

C/D 

sn 

0)    OJ 

H 

CL, 

H 

0%j 

Oh' 

1 

H 

o 

CO 

oi 

da 

S 

cj 

rO      'OOOO  tH  TjcO  O  t-(M 
P05     I  ■"Ji  CO  OT  CO --H  (N  <N  TO 


a>  oo  oo 

1-1  T)ININ?D 


iO"^OOO00OO 


i-HWi-li-lOO    i^muj  t-tooso  c- 


lOOO 


lO'^OOtfJTfOOOO 


ii-neaco    I »o o 00 lo iAc^o o o o 

I  1         iH         .-H  CO  CO  CO  ^  lO  lO 


^OOOOOONOOrJiOOOO 


^oooot-oio-^ot-ooujMoco 

lO -^  Tj* -^  CO  lO -^  CO  CO  C^  T-f  CO 


Nooooooosoo;ocooooo 


?;ES;2;^SS;z;E:2;Eft52;E^S 


>  > 

=5S  O  O. 

3s&&'S'E  =  soogE£g 

3333Mt«33^^3333 


o  o 
o  o 


oo  2  2  ^  ^ 

oooo  c«  c!  ?  V   ;   ;   ;   ; 

•    •  CO.  I     1     I     I 

oo^^.-SlS  ."2:232 

cjoYiCJCJCJOcjc^i 

O   O      ^      ^  .pH  .1-1   -rH  .1-1  .r-l  •«   ^ 

IMINMOTSlSlSllSISINt 


■5^ 

rt  o 


fa  *^ 

•S  § 
o  c 

CD     . 

a.s 


3   :5^ 

■3  »;  S  o 
>  >  E  11 


t:  C  ^  r^ 

"  >-  2  « 
«  <L  85 

CV3   <D   c« 

.2  >>"-^ 
fto  o  o 

.C    O    C<    M 

O    tflTJ 
■ --  +J    g  *-> 

3  3  ^  S 
m  o  o  5 

-glials 

hi  S-2  9 


s  "  5  o 

O  4^   CD  +j 

V  <u  X  a 
.SCO  — 


tx 

. 

.!i 

n 

ja 

*j 

s 

ii 

M 

CD 
> 

0 

01 

3 

0 

c 

_- 

f1 

S         "  3  'S 
—   C  to—   3>« 

+J  o  +^  07!  o 

lso2-S= 
■S  =«-ic  SS 

MWHcog^<; 


Wood    Preservation 


503 


ooo  o 


o  loeo  t-50O 

N  rtT-ll-ll-( 


«>MOOeo 


<>a 


o  *  -• 
.S  "  e 


•O    Oh 


c  u 
■3  * 


•-) 

^ 

p 

M 

< 
Oh 

s 
e 

W      " 

» 

U  ;z; 

S 

«  0 

M 

-tJ     • 

<  a 

f 

P 

•Sl^ 

^§1^ 

0  S 

S 

s 

> 
< 

"■5     ■   3 

?*>« 

■«!! 

H^ 

8 

B 

0 

.,  w 

■S 

flH 

B 

e 

s 

U 

■a 

!;;i 

£ 

S 

s 

t-eoin 

CO  01  Tji 


eowN 


Mosoeo^'H 

■<)>  lO  t- N  N  U5 

to        ^  1-1 


OONOO-iMlO 


;o  c-os  t^oooo 


•"feocoOiH 

■>t!Oi-(N-H 


00  Tji  T)>  00  c- 

10  COtH  t- 


M      ,rt      r^rtO 


iNOi-iO  0;D 


rH       I       iN  r^ 


0000       ^ 


Oi     ii-(     itHNOS         tH     itDC~.-irt05O 


«  eoiooo  4;  00 


00 1- ■<)•  10  05  a>  J  Tf  10  N 10  05 1-1 05  00  S! 
cc  ■*  ■"J  O!  05  05  »  o  05  «D  N     ov  ■" 


o  o  o  o 
0000 

CO    i-H  rt  "-I  r-" 


.      .      •( 

ooc 


10 

."2  o  o 
o  o  o 


e^<T>  "^  e^oooi^ooooo      0000 

lOC-«    10  ■qi  lOOOOCOiOoff-    TO'S'O"" 
005    I     000)0  0-.  t-Oo    I     OOOiO 


o  «  o 


•OTST! 


4)  a>  a>  a*  0^  ^*-'  ™^ 

o  C8  C9  *  c«  £  . 

00  ^  ^  Q*  0-  p  5;; 


es  d  CQ  k.        ee  cd 

3  3  3   tp--^.^ 


00000 

(D  O  4)   d)  Q> 


00000 

d  d  d  c  c5  o 

.^.i;  o  o  o  t)  «  W 

^j: ■" 

■£0  CJ  o  o  o  o^ 

vt;  •  r;  O  o  o  o  O  ft 


O  *  o;.='35.C  a- 


U    C    CJ 

|8g-g 

*^        .S    CO 

►J§>Ph 


o  <v 


S    5° 


■o    .3 


—  U5 

nco 
"43  ^H 
bo  o 
c  ■" 

So 

go. 

*  — 

■♦J  ^ 

fc. 

O  (« 

—  o 

•o  " 

Eo 
U3 

"35 


^  0.  c  c 
.5  c  c  c 

«.s  I  ^  si « 

c_,  3  oQ  k.  r.'n  .p 
g-gS  «  2 


'C  73  'O  "U 

(U    0^    01    IL 


504 


Wood   Preservation 


o3 


o" 
o 


iz;  i-H 


.5     .5t3 

oi  u,  a  <i> 
.2  °.Sta 


gS? 


o  CO     CO 


a  s 


M  ;o     o> 


W  r-l        00 


CO  I       CO 


t>  00 


1-19 

too 


j;^         N 


«ES    H- 


g^ 


^  tj"    ■" 


H-    b 

as 


H  S 


2  g  °  cS  >  a-" 

Q>  ^  c  m  '^     .  ^ 
•<  oJ+^  ft     — 


H  00      00 


w     w 


tf   « 


«      rt 


w  a 


«   tf 


H« 


w     w 


tf       w 


«&5 


sg 


I^     Er 


pc<P^ 


*^a 


t>  O  S'lO  o 


o)  a>  (3  a>  0)  ja 
•^■||-2|'| 

lO  o 

N  >0 


ii-o 


C5  « 


£vO  e  ciio  CI 

«  •£  ^  —  to  ^ -"  to  ^ 

*•  g'^e^'d  ftS^Ts  ft 

.  o     o         in 


Wr-I  iO 


bOft'O 

o 
«3 


Wood   Preservation 


SOS 


•3 


S 


St 
V,  o 


^  c  « 


"  n  - 
m  u  E 
w-O  o 


ooooeo 


00  m  I—  ca  t- 


o  ooo  •>* 
o-^ootoN 

1-1       OJNIN 


lO(MS»-«"rH        1-1 


OOOOTO       O)       O       lO 

■<ii;doooco      o      00     -h 

t-0O'^!D;D        00        03        OJ 


CO  ^  C*4  CO  CO       CO 


oooi'^ooaj 


-.tcoc--*-* 


NoO'^oco 
ootoooooo 


Tf  CO  O   ■*  Tjl 


o  o  oooi  i^io 
CO  ooooo  t- 1* 


CO  00  (N  c- 00  r-i 


ooootooo 
coiOrHinco 


coioNcoeo 


U    QD  Tf  03  O  l£i  t<    00«0"3C-ir5  V    CO 

U V ^< 

«CO'-''*'*S^  *cOt:-OiCO00(M  ._£■ 

OOtO-^OOtO  05    o>00«>lO-*t-  "i    00 


CO    COt-00O3O5O5 


<u  G  ta       O 


OON0300 


f.   OOi-iiMOOtJI       ♦»oo 


H 


u 


2  g  „  S  ?:  ft' 


(2   ^^ 


5>ioN&^?-o>^osO>i^--5'     HNogc-tooo     hoi'^NC-'O'-"      v"^ 


-M     04  c^  lo  o^  CO  00  <;o  w  CO  Oi  w  00 


KSSS 


S      (Ih      »lj      IIh 


04   CO   Ofl   04   C4        — ^ 

o  o  o  o  o      ^ 
V  0)  0)  V  a>      o 


gesgs 


i:;     * 


ww^="ww 


J,     -o 

^  a 


PL,[i,;I;,p^pq    »    pq    H 


£5: 

3:3 


■53     ^     '3     '00 
;  3       e      "^   ,  2 

T3  a)-o  *''0  "1''0  ** 

■g  E'gE'g  S"g  S 
£  a3  sS  3^  3 

0-3  Oq  u-5  0-3 


wHNNt 


fi,Pt,Pnfefe  p^fafePupt, 


3  ja  X 
^  ^  '^  "o  "o 


;& 


-0  73-0  -S 


rt   Cl    y    y   y      • 

o  o  c  c  c*; 


506 


Wood    Preservation 


i,H     KMNNIM 


05  O  00  CO  C- r-(  t- 

;0  in  T)i  to  lo  CO  N 


to  in  i-KD  U5  CO  CC 


.HO      KDCOOt- 


COMCOCO  w* 


It- CD 
ilMCO 


I  C-O      lOOO 
I  eO  rH      lO  ■* 


O  t-fJOON 


o 

tHN 

00  OS 

N  t--*00  0Or-( 
Tf  t>05 

H 

(3 

^ 

■HIM 

<ONtH  CO 

,-H -^Ji  N  t- «5  ■-I 

> 

<3 

u 

y 

>* 

a 

|4 

«D  OIM'H     lOlOO 

01 

otooooco-* 

(N    OONO  W 
.M   0005IM 


"iBOOTtKMOlO  _, 

0)    aiMIM       tOCTl  J2 


05 1- 1-  oi  in  "^ 


u  O 
O  CO 
+J>    CO 

2<ii 


»  o 


3' 

IS 


.S"o 


rt 


lA 


M  .So;  ft'43 

*<     SN  5  c  g 


o-=o 


W'^K 

•"*  t- 

O  5(N 

i2  g 

'-SO 

a  OJ 

o°  s 

5"a 

2!  c 

O  ca 

f^.a 

1=^^  o  _  u 

iin^  m  g_ 

-iH     t3      ^ 

^  ca  M  ca-2  2 

"  o  c  3-  cij  m 


om 


kO  Ci  f-H  CD  c^  c~  (M  OS  L^  L^  wi  U.J  ^'  •*  .^  ^  r>;  IX 


y^    M  M  3    a    O    O 

^  t-t>eoNt-oto 


f-  t-ooint-r;S      « 

^        *n  .^  1,-.  *M  (— 1  to  CO  flj 


■*(S-*inNinN  tc  c- in N o <D CO 


^MW^ 


^^  j:!^^^^ 


[£|  pL|  pE<  p^  pL,  ^  pLl 


tMW 


'-g^^^i 


i   m  -w 


+^  -"^  jj  jj 
ca  ca.tJ.ti 
S  S  c  c 

H    C    (D    0, 

S  2  »  M 
jaja  ca  ca 

U    U     I      I 

_  _  01  a) 

E  £  E  g 


.2.2 
, t'o'o  S  S 


i-^ 


a^  ^  ^  a  ft 
CO  c  ca  ca  m  M 

bfl^  T3  T3  be  bo 
£3      ,   01   0)   C   C 


WfefefeHH 


-    «,      "i      "S  II  - 

.2c  E  E  "  o^o 


O  '^'^3  43  o  O  O 

y    tH     QJ    QJ    y    o    o 

■*fS.2.s  c  c*; 


o  O  o 


ca  ca  ca 

o  o  o 

ca  ja^ 


lo 


PON 


ca,H 
aj  01 


r?-C?T7     -a 


0)^ 


c.S 

O'O 

u  ca 

5P§ 


vf^    .S 


0)  ca 
;  ca  0) 


_  0)  0)  5 
^  C  Jj  o 

II  M  o  ca 
M  H_:  M 
hH  "  ca-* 

..bo  ^ 
to  c<^-g 

.■file's*!    " 

3  5  4J  II  *3  -"  —      ca 
-S=wS-§c      ° 

S^-^iJc  Eg     pt 


^<- 

1^  •  E 

S^3 
C  J  01 


Wood    Preservation 


507 


e: 
e 
<a 

5  g    ©    w 


U^ 


W        H 


A> 


o  < 

a 

<  -^ 

as  >< 

.  < 

SI 


6^ 


9  P 


n 


3U 


°  2; 

O    Q 


U 


2^  « 


2  '^  c 

rt  a»  > 


a  J6      « 

O  g    .2    °^ 


rt-O 


1"^ 


o  s 


00  >n 
oro 


^    C^  CO  ^        CO  rH 


ECO  OS  t- 

•z, 


11  ocoio 
o     .    .    . 

t.    U5C0OJ 


g    lO 


lO  ^J  -^      o  t- 


g  ooco 


CJO 


CI  05  Oi        -1"^ 


O  ^  O       -rf  CI 
O  ^  CO        O  00 

^      ^      N  -< 


t-CO 


O  O  OT3  3 

o*  a*  4*  C  j^ 
u  o  o  °* 

t.     t.     L.     S*  •- 

a  ta  01  -g  ii 

—  —  —  o  -c 

d     A     rt     1;  Q. 

O  O  O  L.  m 

oooo  < 


■r  c         j; 

1^1  I  s^ 


c        ■2,     ^-^ 


3e 


0)  dj  e 


■a  o 

o  D 

s£-3 


ca  "  « 

^  «  c 

_        0)  ■-  O 

~       a>  -  _ 


.^^  o  o  0^  oj  - 
Mfc,  >  3^ 

C  o-i  C  K  c 

go     C  -^  ■!->   4J 

p  •-  ^  "5  "  -5 

^  CT3t3  "t3 

&«  =a  c.S  c 
h  cO<  >< 
_    HI  -  ,,  'C  .. 


508  Wood    Preservation 


Report  on  Assignment  3 

Piling  Used  For  Marine  Construction 

W.  G.  Atwood  (chairman,  subcommittee),  C.  S.  Burt,  W.  F.  Clapp,  E.  A.  Craft,  John 
Foley,  H.  E.  Horrocks,  A.  L.  Kammerer,  A.  M.  Knowles,  F.  B.  Robins,  Hermann 
von  Schrenk. 

The  committee  submits  a  report  of  the  results  of  the  inspections  of  the  test  pieces 
under  its  supervision,  together  with  such  information  on  the  subject  assigned  to  it  as 
has  come  to  its  knowledge. 

Turpentine  Wood 

The  specimens  in  the  Canal  Zone  show  Httle  change  in  the  last  year.  The  heaviest 
attack  was  by  the  pholads. 

The  Southern  Pacific  Company  reports  on  the  condition  of  32  turpentine  wood 
piles  in  a  pier  at  Oakland,  Calif.  No  teredo  attack  is  evident.  Six  of  these  piles  show  no 
limnoria  attack,  3  a  Ught  and  7  a  moderate  limnoria  attack  and  16  a  heavy  Umnoria 
attack.  This  entire  attack  is  in  the  sapwood  and  on  one  or  two  piles  the  sapwood  is 
nearly  eaten  off. 

Panama  Canal 

The  report  by  Mr.  James  Zetek  has  been  made  available  through  the  courtesy  of 
Brigadier  General  Glenn  B.  Edgerton,  governor  of  the  Canal  Zone.  The  inspections  were 
made  October  2  and  the  report  is  quoted  below: 

We  encountered  considerable  silt,  especially  in  the  center  well  of  dock  10, 
and  Mr.  Olsen  will  shorten  the  chains  enough  to  keep  the  timbers  free  from  silt. 
It  would  appear  that  the  upper  and  middle  wells  are  fast  filling  with  silt  and  this 
will  interfere  with  our  tests. 

The  results  this  year  are  particularly  interesting.  The  highly  resistant  timbers 
from  Dutch  Guiana,  New  South  Wales,  the  Phihppines,  Sumatra  and  the  Celebes, 
show  practically  no  change  from  last  year.  The  teredo  is  not  able  to  make  much 
headway,  they  are  few  in  number,  and  small  in  size,  confined  close  to  the  sur- 
faces. The  gribble  {Limnoria  Ugnorum  Rathke)  is  relatively  unimportant  except 
in  a  few  cases.  The  really  destructive  agents  are  the  two  boring  clams,  Martesia 
striata  L,  and  Hiata  infelix  Zetek  and  McLean.  In  some  timbers  these  can  be 
considered  as  plentiful.  Although  necessarily  confined  to  the  surfaces,  their  work, 
because  of  the  size  and  shape  of  the  cavity  they  inhabit,  extends  inward  at  least 
one  inch.  This  year  I  found  few  live  pholads,  and  I  believe  the  silt  killed  off 
most  of  them.  Even  the  gribble  seems  to  have  been  affected  by  the  silt. 

Neither  Sphaeroma  nor  Chelura  were  found. 

The  only  treated  timber,  Chemonite  (No.  2447),  in  rack  1721-31  was  re- 
moved from  the  test,  being  thoroughly  invaded  by  teredo. 

Perhaps  the  most  interesting  results  were  found  in  the  two  10  x  5  x  48-in. 
pieces  of  red  mangrove,  which  were  installed  April  19,  1940,  only  five  months 
ago.  Both  showed  what  I  consider  to  be  an  active  teredo  invasion.  It  is  only  a 
question  of  time,  brief  at  that,  so  that  it  would  appear  that  red  mangrove  is 
not  resistant  to  teredo.  Samples  of  this  same  lot  of  red  mangrove  in  our  termite 
resistance  showed  last  month  active  attack  by  Coptotermes  niger. 

The  two  pieces  of  red  mangrove  in  racks  16  and  17  had  a  species  of  teredo 
which  is  different  from  those  known  from  this  region.  The  pallets  are  large  and 
massive,  not  frail,  3.5  cm.  long.  This  same  species  was  collected  by  me  several 
years  ago  and  was  sent  to  Dr.  Paul  Bartsch  of  the  U.  S.  National  Museum  who 
at  the  time  said  it  was  new  but  as  yet  did  not  describe  it.  This  one  was  found 
where  there  was  much  silt.  (Fig.  1) 


Wood   Preservation 


509 


Fig.   1. 


A — Untreated  Timbers 

1609-2  Anoura,  Conepia  sp.,  Dutch  Guiana,  submerged  September  13,  1923 
(Rack  26).  Some  silt.  Considerable  marine  growth.  Gribble  damage  about  the 
same,  worse  on  one  face,  about  J/^  in.  deep.  Both  pholads  present,  plentiful. 
Teredo  as  before,  not  many,  small  close  to  surfaces.  Most  of  the  destruction  is 
due  to  the  pholads  and  gribble.  The  timber,  except  for  this  external  deterioration 
is  very  sound. 

1612-3  Basra-Locus  (ANGELIQUE),  Dicornia  paraensis  Bentham,  Dutch 
Guiana  (Rack  29),  submerged  September  13,  1923.  Some  silt.  Fair  amount  of 
marine  growth,  especially  sponges.  Gribble  not  serious,  less  than  in  Anoura.  Both 
pholads  quite  plentiful,  also  working  on  the  cut  face.  Teredos  are  small,  few  in 
number  (more  so  than  in  Anoura),  but  all  seem  to  be  confined  close  to  the 
surfaces.  Except  for  this  surface  work  the  timber  is  very  sound. 

1608^  Foengo,  Parinarium  campestre  Aubl.,  Dutch  Guiana,  submerged  Sep- 
tember 13,  1923  (Rack  32).  Some  silt.  Marine  growth  abundant,  especially 
sponges.  Gribble  about  as  in  Anoura,  one  face  is  badly  attacked  but  in  general 
progress  is  slow;  working  also  on  the  cut  face.  Teredoes  few  in  number,  small, 
close  to  surfaces.  Both  pholads  plentiful,  also  starting  on  the  cut  face.  Except 
for  the  surface  damage,  this  timber  is  very  sound. 

1610-S  Sponse  Hoedoe,  Licania  macrophylla  Bentham,  Dutch  Guiana,  sub- 
merged September  13,  1923  (Rack  33).  Much  silt.  Marine  growth  very  plentiful 
on  all  surfaces.  Gribble  attack  about  as  in  Basra  Locus,  one  face  considerably 
worn  away,  about  ^  in.;  also  on  cut  face.  Pholads  are  quite  abundant  and  have 
started  on  the  cut  face.  Teredos  are  confined  close  to  the  surfaces,  few  in  number, 
small  in  size.  Otherwise  the  timber  is  very  sound. 

1613-7  Manbarklak,  Eschwilera  longipes  Miers.,  Dutch  Guiana,  submerged 
September  13,  1923  (Rack  34).  Marine  growth  plentiful.  Some  silt.  Gribble 
damage  very  hght  except  on  one  face;  cut  face  free  of  attack.  It  would  seem  that 
the  gribble  works  very  slowly  on  this  timber.  Both  pholads  fairly  abundant. 
Teredos  small,  few  in  number,  close  to  surfaces.  Except  as  noted,  the  timber  is 
very  sound. 

1606-9  Malabayabas,  Tristania  decorticata  Merr.,  Philippine  Islands,  sub- 
merged September  13,  1923  (Rack  35).  Marine  growth  scant.  Some  silt.  Gribble 
damage  is  light,  slightly  more  so  on  one  face.  Teredos  seem  to  be  all  small,  unim- 


510  Wood   Preservation 


portant,  few  in  number,  close  to  surfaces.  Both  pholads  are  abundant,  also  on 
the  cut  face.  Pholads  cause  most  of  the  deterioration;  otherwise  this  timber  is 
very  sound. 

1615-11  Kajol  Lara,  Metrosideros  Sp.,  Celebes,  submerged  October  26,  1925 
(Rack  36).  Considerable  silt.  Marine  growth,  especially  sponges,  fairly  abundant. 
Gribble  work  very  light.  Teredos  few  in  number,  close  to  surfaces,  all  small.  Both 
pholads  present  but  few  in  number.  This  timber  is  in  exceptionally  good  shape. 

1616-12  Kajol  Malas,  Parastemon  urophyllum,  Sumatra,  submerged  October 
26,  1925  (Rack  23).  Some  silt.  Marine  growth  pronounced,  especially  oysters  and 
ascidians.  Gribble  hght,  more  on  one  face,  and  more  than  on  Kajol  Lara.  Both 
pholads  are  represented  only  in  very  limited  number.  Teredos  unimportant,  small, 
close  to  surfaces.  Timber  very  sound. 

1637-13  Kolaka,  Celebes,  submerged  April  15,  1932  (Rack  13).  Very  much 
silt.  Marine  growth,  especially  bryozoa,  plentiful.  Gribble  work  very  light  almost 
nil,  cut  surface  practically  not  attacked.  Both  pholads  present  in  small  number. 
Teredos  not  important,  all  small  and  close  to  surfaces.  Timber  very  sound. 

1617-14  Alcornoque,  Dimorphandra  mora  B.  &  H.,  Panama  (all  heartwood), 
submerged  September  22,  1927  (Rack  14).  Very  much  silt.  Marine  growth  very 
abundant.  Both  pholads  present,  not  plentiful,  more  on  one  face.  Gribble  work 
is  very  hght.  Teredos  seem  to  be  very  limited  in  number,  all  close  to  surfaces,  all 
small.  The  surfaces  of  this  timber  are  in  quite  good  shape.  Timber  very  sound. 

1625-22  Brush  Box,  New  South  Wales,  submerged  April  19,  1929  (Rack  22). 
Some  silt.  Marine  growth  fairly  plentiful.  Gribble  work  almost  nil  except  one 
face  (not  heavy,  however) ;  cut  face  almost  none.  Both  pholads  few  in  number. 
Teredos  seem  to  be  scant  in  number,  near  the  surface,  and  all  small.  Timber 
very  sound. 

1645-16  Red  Mangrove,  Rhizophora  mangle  L.,  Colombia  (Pacific  Side), 
10  X  5  X  48  in.,  submerged  April  19,  1940  (Rack  16).  Very  much  silt,  resting  on 
bottom.  Marine  growth  nil.  Gribble  nil.  No  pholads  observed.  Teredos  very 
abundant,  seems  to  be  a  very  healthy  attack.  Surfaces  have  great  numbers  of  tiny 
holes  and  in  those  could  be  seen  the  ends  of  the  pallets  of  the  teredos.  One  edge 
has  many  teredos  3/16  to  5/16  in.  diameter  from  which  I  extracted  pallets  for 
purposes  of  identification.  These  pallets  agree  with  those  of  a  new  species  col- 
lected a  few  years  ago.  These  pallets  are  3.5  cm.  long,  massive  and  rugged,  not 
frail.  As  soon  as  this  species  is  identified  (or  described  since  it  is  undoubtedly  a 
new  species)   its  name  will  be  given  in  a  supplementary  report. 

There  can  be  no  question  but  that  this  timber  was  attacked  by  teredo  in 
our  waters  and  that  this  red  mangrove  is  not  as  resistant  to  teredo  as  it  is 
reputed  to  be.  I  did  not  feel  justified  to  chop  into  either  of  these  two  samples,  but 
next  year  we  should  remove  one  of  these  for  a  thorough  examination.  The  teredo 
is  in  both  heart  and  sapwood. 

B — Treated  Timbers 
1721-31  Chemonite  Treatment,  Southern  Yellow  Pine  (2447),  6  in.  diam.  by 
7  ft.  long  submerged  March  12,  1937  (Rack  31).  Considerable  silt.  Much  marine 
growth,  especially  sponges,  oysters  and  bryozoa.  The  timber  was  removed  from 
the  test  and  the  attached  ^photographs  give  testimony  to  the  thoroughness  of  the 
work  of  the  teredos,  more  pronounced  than  No.  2468  reported  in  last  year's 
supplement  to  the  1939  Annual  Report.  Test  closed. 

Chemical   Warfare   Service    Specimens 
Series  No.  1 

No.  1.  1  percent  ammoniacal  copper  carbonate.  Only  two  pieces  remain.  The  one 
at  San  Juan,  P.  R.,  shows  no  change.  The  one  at  Oakland  Pier,  San  Francisco  bay  shows 
a  very  light  limnoria  attack. 

No.  2.  1  percent  diphenylamine  in  creosote.  There  is  no  change  in  the  piece  at 
San  Juan.  There  is  no  attack  on  the  piece  at  Oakland  Pier  and  a  very  light  attack 
by  limnoria  on  the  piece  at  Peralta  Wharf.  The  untreated  control  pieces  at  Oakland  Pier 
showed  a  light  attack  by  hmnoria  and  a  few  teredo.  The  similar  pieces  at  Peralta  Wharf 
had  a  heavy  attack  by  limnoria,  teredo  and  Bankia. 

*  Photographs  omitted  from  this  report. 


Wood    Preservation  Sll 


Series  No.  2 

The  specimens  in  this  series  were  treated  at  Edgewood  Arsenal  by  the  Chemical 
Warfare  Service  in  1931.  Control  pieces  were  treated  with  AREA  No.  1  creosote.  Several 
series  of  five  pieces  each  were  treated  with  AREA  No.  1  creosote  to  which  had  been 
added  various  proportions  of  methyl  arsenious  oxide,  diphenylamine  chlorarsene,  and 
dinitrophenol.  A  similar  series  was  treated  with  fuel  oil  to  which  the  same  chemicals 
were  added. 

A  long  series  of  experiments  at  the  Edgewood  Arsenal  had  indicated  that  these 
chemicals  were  lethal  to  both  the  teredine  and  crustacean  borers.  The  purpose  of  the 
tests  was  to  find  out  whether  fuel  oil  to  which  any  of  these  chemicals  had  been  added 
would  resist  attack  and  whether  their  addition  to  creosote  would  increase  its  resistance 
to  attack.  Unfortunately  the  treating  was  not  well  done  and  while  the  treatment  was 
to  refusal  the  end  penetration  was  small.  The  first  attack  on  all  the  pieces  was  in  the 
lightly  treated  ends. 

Reports  have  been  made  annually  since  the  tests  were  installed  in  1931  and  1932. 
Test  pieces  have  been  so  badly  damaged  at  the  Panama  Canal  Zone,  The  Cavite  Naval 
Station  and  the  Puget  Sound  Navy  Yard  that  the  tests  were  closed.  The  reports  this 
year  from  the  Pearl  Harbor  Navy  Yard  show  that  the  destruction  has  been  so  heavy 
that  the  remaining  pieces  may  well  be  discarded  and  the  test  stopped  at  that  location. 

The  inspection  report  from  Fort  Tilden,  N.  Y.,  shows  little  change  in  the  condition 
of  the  test  pieces  since  last  year  though  the  untreated  control  pieces  were  destroyed.  All 
the  pieces  treated  with  fuel  oil  carrier  have  been  heavily  attacked  but  have  some  little 
strength  left  after  nine  years  immersion.  The  untreated  controls  have  been  destroyed  and 
replaced  several   times. 

The  report  on  the  pieces  at  Castle  Pinckney,  in  the  harbor  of  Charleston,  S.  C, 
states  that  the  pieces  treated  with  straight  creosote  and  with  creosote  to  which  methyl 
arsenious  oxide  had  been  added  have  been  75  percent  destroyed  and  will  probably  be 
entirely  gone  in  another  year.  The  pieces  to  which  dinitrophenol  had  been  added  to 
the  creosote  are  reported  to  be  SO  percent  destroyed  but  no  distinction  is  made  between 
those  to  which  0.77  percent  and  2>4  percent  had  been  used. 

The  Coast  Guard  report  on  the  pieces  at  San  Juan,  P.  R.,  states  that  there  is  no 
change  in  condition  since  last  year. 

The  Naval  Air  Station  at  Pensacola,  Fla.,  reports  that  the  inspection  shows  that 
the  heavy  limnoria  attack  on  the  ends  of  the  creosoted  pieces  continues  and  that  there 
is  some  teredo  attack  in  the  same  places.  All  pieces  show  some  limnoria  attack  on  the 
sides.  It  would  appear  that  the  pieces  treated  with  cresote  to  which  dinitrophenol  had 
been  added  were  less  heavily  attacked  than  the  others.  Those  containing  lYz  percent 
dinitrophenol  were  in  the  best  condition. 

The  pieces  at  Oakland  Pier  showed  no  new  attack  on  the  creosoted  pieces  but  a 
heavy  limnoria  and  a  light  teredo  attack  on  the  oil  treated  pieces.  The  untreated  controls 
showed  a  heavy  limnoria  attack. 

At  Peralta  Wharf  three  of  the  creosoted  pieces  showed  a  light  limnoria  attack  on 
the  sides  and  a  heavy  one  on  the  ends  while  the  one  with  2>2  percent  dinitrophenol 
added  to  the  creosote  showed  no  new  attack  on  the  sides  and  a  light  limnoria  attack 
on  the  ends.  The  oil  treated  pieces  showed  a  heavy  limnoria  and  a  light  Bankia  attack. 
The  untreated  controls  showed  a  heavy  limnoria  attack  and  some  attack  by  teredo  and 
Bankia. 

The  report  from  the  Pearl  Harbor  Navy  Yard  showed  that  the  pieces  treated  with 
creosote  and  creosote  with  methyl  arsenious  oxide  were  not  in  as  good  condition  as  those 
treated  with  creosote  and  dinitrophenol.  Pieces  in  the  best  condition  were  those  treated 
with  creosote  and  2J/2  percent  dinitrophenol. 

San  Francisco  Bay  Tests 

The  test  pieces  prepared  by  the  Barrett  Manufacturing  Co.  were  placed  in  test  at 
Pier  7  San  Francisco  in  January  1923  and  moved  to  Oakland  Pier  in  1925.  They  show 
little  change  in  condition  since  the  last  report.  A  few  of  them  showed  a  slightly  increased 
limnoria  attack.  The  untreated  control  pieces  showed  a  moderately  heavy  limnoria  attack. 


512  Wood   Preservation 


Test  Piles 

At  Tiburon  two  of  the  piles  are  missing,  one  shows  no  sign  of  deterioration,  four  of 
them  have  been  attacked,  one  of  which  is  nearly  cut  off. 

At  San  Pedro  there  are  three  of  the  Long  Wharf  piles  originally  driven  in  1890. 
Two  of  these  are  intact  and  the  third  has  lost  30  percent  of  its  section  by  limnoria 
attack.  Two  piles  treated  in  1919  are  so  placed  that  the  mud  line  is  exposed  at  low  tide. 
There  is  no  attack  on  these  piles. 

At  Long  Beach  one  of  the  1890  piles  was  lost  by  accident,  one  is  intact,  and  the 
third  has  been  30  percent  destroyed  by  hmnoria.  The  one  Long  Wharf  pile  originally 
driven  in  1901  has  been  80  percent  eaten  away  by  hmnoria.  The  two  1919  piles  show 
some  attack  at  the  low  water  line. 

New  England  Report 

The  operation  and  regular  inspection  of  the  many  test  boards  and  blocks  was 
continued.  Reports  follow: 

At  Corner  Brook,  Newfoundland,  there  was  a  very  marked  decrease  in  the  intensity 
of  attack.  A  large  part  of  the  wharf  area  has  been  filled,  covering  the  piles,  and  those 
not  covered  have  been  replaced  by  creosoted  piles. 

At  Liverpool,  N.  S.,  teredo  have  been  very  active  at  locations  where  they  did  not 
appear  at  all  from  1935  to  1938  and  where  there  were  very  few  in  1938. 

At  Luneberg  teredo  have  been  and  are  very  active. 

A  diver's  inspection  was  made  of  two  wharves  at  Searsport,  Me.,  which  were  built 
on  creosoted  piles  with  16  lb.  treatment  in  1925  and  one  wharf  built  in  1932  on  oak 
piles  with  the  bark  left  on.  The  creosoted  piles  showed  no  damage  from  teredo  and 
penetration  by  limnoria  in  a  few  places  to  a  depth  of  from  54  to  Yt,  in.  The  oak  piles 
in  the  adjoining  wharf  showed  an  average  reduction  of  section  of  about  25  percent 
while  some  spruce  piles  driven  at  the  same  time  were  entirely  destroyed. 

Limnoria  are  very  destructive  in  the  harbor  of  Portland,  Me.,  but  teredo,  while 
present  do  little  or  no  damage  at  the  present  time.  A  diver's  inspection  of  the  piles 
under  two  wharves  on  islands  in  the  harbor,  where  to  all  appearances  the  conditions 
are  the  same,  show  opposite  results.  These  wharves  were  built  on  oak  piles  with  the 
bark  left  on  in  1909.  One  of  them  was  uninjured  and  the  other  was  practically  destroyed 
by  limnoria.  No  teredo  were  found. 

There  has  been  Uttle  change  in  conditions  between  Portland  and  Cape  Cod  though 
there  seems  to  be  a  trend  toward  increasing  activity  by  teredo  and  limnoria. 

Teredo  have  appeared  in  the  upper  harbor  of  Providence,  R.  I.,  but  have,  as  yet 
done  little  damage. 

Examinations  made  of  the  untreated  piles  in  several  wharves  in  Narraganset  bay 
have  shown  heavy  attack  by  teredo,  limnoria  and  chelura. 

At  Saybrook,  Conn.,  the  damage  done  by  teredo  is  increasing  rapidly.  The  salinity, 
at  one  stage  of  the  tide,  falls  to  3  parts  per  1,000  and  rises  to  full  ocean  salinity  at 
another  stage. 

Many  piles  have  been  examined  on  Fishers,  Plum  and  Gull  islands  in  Long  Island 
sound.  There  is  a  heavy  attack  by  chelura  and  in  some  places  by  teredo. 

All  three  species  of  borers  continue  to  be  active  in  New  London  harbor  and  teredo 
have  become  plentiful  as  far  up  the  river  as  Allyn's  Point. 

New  York   Investigation 

The  study  of  test  boards,  the  examination  of  piles  in  various  parts  of  the  harbor, 
and  the  study  of  water  analyses  has  been  continued.  The  committee  in  charge  does  not 
think  that  there  is  any  valuable  information  available  for  publication. 

"Sea  Action  Committee" 

This  committee  of  the  Institution  of  Engineers,  London,  has  recently  issued  its 
18th  interim  report.  This  report  is  a  discussion  of  the  results  of  the  5,  10,  and  IS-year 
corrosion  tests  which  have  been  referred  to  in  the  reports  of  this  committee  from  time 
to  time. 


Wood   Preservation  513 


The  test  pieces  were  placed  at  Halifax,  N.  S.,  Auckland,  N.  Z.,  Colombo,  Ceylon, 
and  Portsmouth,  England.  Three  sets  were  placed  above  high  tide,  three  at  half  tide 
and  three  fully  immersed  at  each  of  the  cities  indicated.  One  set  was  removed  at  each 
place  at  the  end  of  5,  10,  and  IS  years  and  sent  to  laboratories  in  England  for  examina- 
tion. Each  set  was  made  up  of  three  irons,  several  commercial  steels  of  varying  composi- 
tions, two  copper-bearing  steels,  chromium  and  nickel  steels  and  cast  irons. 

The  results  were  extremely  variable.  Some  of  the  materials  that  gave  the  best 
results  above  high  water  did  not  show  as  well  as  some  others  at  half  tide  or  completely 
immersed  and  some  that  showed  best  in  temperate  zone  harbors  did  not  do  so  well  in 
tropical  harbors. 

The  information  in  this  report  is  of  great  value,  but  it  must  be  used  with  care 
and  with  reference  to  the  climate  in  which  the  structure  is  to  be  built.  It  is  not  possible 
to  condense  the  information  in  such  an  abstract  as  can  be  here  presented. 

Summary 

The  test  pieces  prepared  by  the  Chemical  Warfare  Service  have  not  given  the 
information  that  was  hoped  for  when  they  were  prepared,  principally  because  the  treat- 
ment was  defective  at  the  ends.  The  borers  attacked  the  ends  and  opened  up  an  easy 
zone  of  attack  of  which  all  borers  present  took  advantage. 

It  would  probably  be  safe  to  say  that  the  life  of  timber  in  badly  infested  water  is 
somewhat  prolonged  by  treatment  with  fuel  oil  to  which  2J^  percent  of  dinitrophenol 
has  been  added.  This  treatment  is  more  effective  against  teredo  navalis  than  it  is  against 
some  other  species  of  borers.  It  is  not  so  effective  against  limnoria.  This  type  of  treat- 
ment might  be  useful  for  the  treatment  of  piles  to  be  used  in  temporary  structures, 
especially  if  the  price  of  creosote  were  high.  The  other  chemicals  tried  gave  some  pro- 
tection but  did  not  seem  as  effective  as  dinitrophenol. 

The  imperfect  end  treatment  will  prevent  the  gaining  of  much  information  with 
regard  to  the  creosoted  pieces.  The  destruction  through  the  ends  will  be  so  great  before 
the  attack  on  the  periphery  goes  far  that  no  conclusions  can  be  drawn.  There  are  some 
indications  that  the  addition  of  2^  percent  dinitrophenol  does  add  to  the  resistance  of 
creosote  but  that  can  not  be  said  with  certainty. 

The  Panama  Canal  tests  of  tropical  timbers  show  clearly  that  there  are  a  number 
of  timbers  which  have  a  high  resistance  to  attack  by  the  species  present  in  the 
Canal  Zone. 


This  report  is  offered  as  information.  It  is  recommended  that  the  subject  be  continued. 


Report  on  Assignment  5 
Destruction  By  Termites  and  Possible  Ways  o£  Prevention 

Hermann  von  Schrenk  (chairman,  subcommittee),  W.  G.  Atwood,  E.  A.  Craft,  W.  F. 
Clapp,  John  Foley,  A.  M.  Knowles,  F.  D.  Mattos,  F.  B.  Robins,  W.  A.  Summerhays. 

The  committee  on  termites  has  continued  its  investigations  as  to  methods  for  pre- 
venting the  attack  of  these  insects.  There  is  Uttle  to  add  this  year  to  the  recommendations 
made  in  previous  reports.  The  experimental  installation  at  Florissant,  Mo.,  is  as  yet 
too  recent  to  warrant  pulHng  up  the  stakes.  Some  of  them  may  possibly  be  pulled 
during  the  coming  year,  but  that  will  be  decided  after  further  consideration  by  the 
committee. 


514  Wood   Preservation 


One  matter  which  the  committee  wishes  again  to  stress  is  the  importance  of  the 
proper  installation  of  termite  shields.  Numerous  cases  have  come  to  the  committee's 
attention  where  termites  have  gotten  into  buildings,  in  spite  of  the  fact  that  they  were 
supposed  to  be  protected  by  termite  shields.  Examination  in  these  cases  has  shown  that 
the  shields  were  not  properly  applied.  Shields  to  be  effective  must  cover  the  entire 
foundation  wall,  top  of  posts,  under  stairways,  etc.;  the  horizontal  surface  of  the  shield 
must  project  three  inches  from  the  edge  of  the  wall  or  pier.  It  should  then  be  bent  at 
a  45-deg.  angle  for  a  distance  of  three  inches.  If  the  shields  are  bent  down  at  the  edge 
of  the  wall  or  pier,  the  termites  can  fill  in  the  space  between  the  vertical  part  of  the 
wall  and  the  shield,  and  thus  get  on  top  of  the  shield.  There  must  be  a  three  inch  space 
between  the  point  where  the  shield  is  bent  and  the  vertical  wall.  There  must  also  be  at 
least  three  inches  between  the  point  where  the  shield  is  bent  and  the  end  of  the  shield. 

Another  point  in  connection  with  shield  failure  is  that  frequently  shields  are  put  in 
in  short  lengths  and  the  end  of  one  shield  is  simply  put  on  top  of  the  next  shield.  This 
makes  the  shield  useless  because  termites  will  get  in  at  the  joint.  All  shields  laid  next  to 
each  other  should  be  soldered  so  as  to  make  a  continuous  piece  of  metal. 


This  report  is  presented  as  information  with  the  recommendation  that  the  subject 
be  continued. 


Report  of  Committee  12 — Rules  and  Organization 

W.  T.  DoRRANCE,  Chairman,  W.  O.   Cudworth  B.  R.  Kulp 

J.  B.  Akers  G.  H.  Harris  C.  H.  Mottier 

W.  C.  Barrett  G.  W.  Harris  R.  C.  White 

D.  P.  Beach  E.  M.  Hastings  F.  B.  Wiegand 

Richard  Brooke  A.  A.  Jackson  Committee. 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on   the  following  subjects: 

1.  Revision  of  Manual. 

The  committee  recommends  the  elimination  of  all  material  heretofore  adopted  by  the 
Association  on  the  recommendation  of  Committee  12  and  pubhshed  in  the  1929  Manual 
and  supplements  thereto,  and  withheld  from  publication  in  the  present  Manual  by  order 
of  the  Board  of  Direction. 

2.  Prepare  rules  and  regulations  for  the  guidance  of  employees  of  the  maintenance 
of  way  department,  collaborating  with  appropriate  standing  committees. 

The  committee  offers  as  a  substitute  for  the  above  deleted  material  the  following 
material  as  found  in  the  report. 

The  Committee  on  Rules  and  Organization, 

W.  T.  Dorrance,  Chairman. 


RULES  AND  REGULATIONS  GOVERNING   MAINTENANCE   OF 
WAY  AND  STRUCTURES  EMPLOYEES 

I  GENERAL 

GENERAL  NOTICE 

Safety  is  of  the  first  importance  in  the  discharge  of  duty. 

Obedience  to  the  rules  is  essential  to  safety. 

To  enter  or  remain  in  the  service  is  an  assurance  of  willingness  to  obey  the  rules. 

The  service  demands  the  faithful,  intelligent  and  courteous  discharge  of  duty. 

EMPLOYMENT,  PROMOTION  AND  DISCIPLINE 

1.  Application  for  Employment. — Employees  must  pass  the  required  examinations. 

2.  Employment  of  Minors. — Minors  must  not  be  employed,  except  as  allowed  by 
law,  and  then  only  after  written  consent  and  release  on  the  proper  form  has  been 
obtained  from  parents  or  guardians. 

3.  Physical  Defects. — A  person  whose  hearing,  sight  or  color  perception  is  known  to 
be  defective  must  not  be  employed  in  any  capacity  where  such  defect  may  endanger  the 
safety  of  persons  or  property. 

4.  Promotion. — Employees  will  be  regarded  as  in  line  of  promotion.  Their  advance- 
ment will  be  dependent  upon  the  faithful,  intelligent  and  courteous  discharge  of  duty 
and  capacity  for  increased  responsibility. 


Bulletin  423,   February,   1941. 

SIS 


516 Rules   and    Organization ^_^ 

5.  Requirements  for  Promotion. — No  appointment  or  promotion  to  the  position  of 
foreman  or  assistant  foreman  will  be  made  until  the  applicant  has  been  examined  as  to 
his  knowledge  and  understanding  of  all  rules  which  relate  to  his  duty,  and  has  received 
a  certificate  of  qualification  signed  by  the  proper  officer. 

6.  Re-employment. — Employees  whose  duties  are  prescribed  by  these  rules,  if  dis- 
missed, will  not  be  re-employed  without  the  approval  of  the  proper  officer. 

7.  Discipline  Record. — Employees  are  subject  to  record  discipline,  suspension  or 
dismissal  for  cause. 

CONDUCT 

20.  General  C onduct .—Civil,  gentlemanly  deportment  is  required  of  all  employees 
in  their  intercourse  with  the  public,  their  subordinates  and  each  other. 

21.  Carelessness. — Employees  who  are  careless  of  the  safety  of  themselves  or  others 
will  be  subjected  to  proper  discipline. 

22.  Use  of  Intoxicants  and  Narcotics. — The  use  of  intoxicants  or  narcotics  is 
prohibited. 

Responsibilities  and  Restrictions 

30.  Books  of  Rules  and  Regulations. — Employees  whose  duties  are  prescribed  by 
these  rules  and  regulations  must  provide  themselves  with  copies.  They  must  familiarize 
themselves  with  the  rules  and  regulations  affecting  their  duties,  whether  or  not  they 
appear  under  the  head  of  their  specific  duties,  and  must  be  prepared  to  pass  an  examina- 
tion on  them  at  any  time.  If  in  doubt  as  to  the  exact  meaning  of  any  rule  or  regulation 
they  must  apply  to  the  proper  authority  for  explanation. 

31.  Devote  Services  Exclusively  to  Company. — Employees  must  devote  themselves 
exclusively  to  the  service  of  the  Company,  and  must  not  connect  themselves  with  any 
other  trade  or  business  without  permission  from  the  proper  officer. 

32.  Attend  to  Duties. — Employees  must  attend  to  their  duties  during  prescribed 
hours,  and  obey  promptly  instructions  of  their  superiors. 

33.  Absence  from  Duties. — Employees  must  not  absent  themselves  from  duty  with- 
out permission.  They  must  not  exchange  duties  with  others,  or  engage  substitutes  without 
proper  authority. 

34.  Leave  Address. — Employees  must  leave  their  address  with  the  proper  officer  or 
head  of  department,  and  give  prompt  notice  of  any  change  of  residence. 

35.  Assignment  of  Wages. — Employees  must  not,  without  proper  authority,  assign 
their  wages. 

36.  Incurring  Company  Obligations. — Employees  must  not  incur  any  obligation  on 
account  of  the  Company,  or  use  the  Company's  credit,  unless  authorized  by  the  proper 
officer. 

37.  Sale  of  Company  Properly. — Employees  must  not  sell  or  in  any  way  dispose  of 
Company  property  except  by  proper  authority. 

38.  Receiving  Fees  and  Contributions, — Employees  must  not  ask  for  or  accept  fees 
or  commissions  from  subordinates,  fellow  employees,  patrons  of  the  Company  or  the 
public. 

39.  Color  of  Garments. — Employees  working  on  or  about  the  track  must  not  wear 
red  outer  garments  which  might  be  mistaken  for  signals. 

40.  Experimental  Installations. — Employees  must  not  permit,  except  by  proper 
authority,  experimental  trials  of  appliances  or  devices,  nor  give  out  information  of  the 
result  of  any  such  trial.  They  must  not  answer  communications  from  manufacturers  of 


Rules    and    Organization 517 

or  dealers  in  tools  or  appliances  but  should  forward  such  communications  to  their 
immediate  superior  with  complete  expression  of  views. 

41.  Railroad  Records. — Those  who  are  entrusted  with  the  records  of  the  Company 
must  not  permit  unauthorized  persons  to  have  access  thereto;  or  without  proper 
authority,  must  not  divulge  any  of  the  Company's  affairs. 

42.  Cooperation. — Cooperation  is  required  between  all  employees  whose  work  or 
duties  may  be  jointly  affected. 

43.  Switch  Keys. — Any  employee  whose  duties  require,  will  be  provided  with  a 
switch  key,  for  which  a  receipt  will  be  taken.  In  case  key  is  lost,  or  not  returned  upon 

leaving  the  service   dollars  will  be  deducted  from  the  amount  due  him. 

Employees  must  keep  their  switch  keys  in  their  possession  at  all  times.  Under  no  circum- 
stances will  they  give  the  key  to  any  person,  other  than  a  substitute  foreman  or  allow 
anyone  to  use  it  for  them. 

44.  Return  of  Railroad  Property. — The  articles  furnished  by  the  Company  for  the 
use  of  employees  must,  on  their  leaving  the  service,  be  returned  to  the  proper  officer. 

45.  Misuse  of  Coal. — Employees  must  not  take  revenue  coal  for  any  purpose,  nor 
Company  coal,  except  when  so  authorized. 

46.  Railroad  Mail. — Letters  of  a  personal  nature  must  not  be  sent  by  railroad  mail, 
as  it  is  a  violation  of  the  U.  S.  postal  laws. 

Conduct  of  Work 

50.  Jurisdiction  of  Officers. — Employees  whose  duties  require  service  on  more  than 
one  division  or  district  are  under  the  jurisdiction  of  the  officers  of  the  division  or  district 
on  which  the  service  is  being  performed. 

51.  Obeying  Calls  from  Trainmen. — Should  trains  be  delayed  by  accident  or  from 
other  cause,  the  conductor  is  authorized  to  call  on  any  employee  for  assistance. 

52.  Handling  Su^iicAc^.— Immediately  upon  closing  and  locking  a  main  track  switch, 
the  employee  doing  so  must  observe  that  the  points  fit  properly.  Main  track  switches 
must  not  be  unlocked  or  handled  within  view  of  approaching  trains. 

53.  Obstructing  View  of  Switches. — Employees  must  not  stand  where  they  will 
obstruct  the  view  of  a  switch-stand  from  passing  trains  and  should  not  stand  within 
feet  of  a  switch  when  a  train  is  approaching  or  passing. 

54.  Not  Throw  Switches  for  Trainmen. — Except  to  prevent  accident,  employees  must 
not  handle  switches  for  trainmen  or  switch  tenders. 

55.  Train  in  Both  Directions. — Trains  may  be  run  at  any  time,  upon  any  track  in 
either  direction,  without  notice  to  employees.  Employees  must  be  governed  accordingly 
and  exercise  proper  care  to  avoid  accident. 

56.  Observe  Signals  on  Trains. — Employees  must  observe  signals  displayed  by  all 
trains  and  assure  themselves  before  obstructing  track  that  all  scheduled  trains  and 
sections  due  have  passed. 

57.  Watching  Passing  Trains. — Employees  must  observe  trains  closely,  and  if  any- 
thing dangerous  is  noted,  such  as  loose  wheel,  broken  wheel  flange,  broken  rim,  hot  box, 
defective  coupling,  dragging  equipment,  badly  pounding  wheel,  shifted  load  in  open-top 
car;  or  if  trains  are  running  too  closely  together,  must  call  attention  of  train  and 
enginemen  to  the  fact  by  signal ;  and  failing  to  accomplish  this,  must  notify  the  dispatcher. 

58.  Working  During  Fogs. — Work  should  not  be  done  on  track  or  track  structures 
during  fogs  or  heavy  storms,  but  when  unavoidable,  the  greatest  care  must  be  taken  to 
insure  full  protection  to  men  and  trains. 

59.  Protection  of  Company  Property. — In  case  of  danger  to  the  Company's  prop- 
erty, employees  must  unite  to  protect  it.  They  must  report  promptly  to  their  superior 


518 Rules   and    Organization 

officers  any  apparently  unauthorized  encroachment  upon  or  occupancy  of  company  prop- 
erty. Supervisory  officers  should  familiarize  themselves  with  the  boundary  lines  of  the 
Company's  property  and  must  not  permit  encroachment  or  occupancy  of  Companj- 
property  except  upon  proper  authority. 

60.  Protection  of  Wires. — Wires  found  broken  must  be  repaired  temporarily  or 
fastened  to  clear  other  wires  when  such  wires  are  safe  to  handle,  and  reported  to  dis- 
patcher by  telegraph  or  telephone.  Dispatcher  must  also  be  advised  promptly  of  damaged 
wires  which  cannot  be  repaired  temporarily.  Location  of  train-order  wires  must  be 
known  and  preference  be  given  to  repairing  them.  Dead  and  leaning  trees  which  may 
endanger  wires  during  storms  should  be  removed.  In  case  they  are  not  located  on  the 
right-of-way,  efforts  should  be  made  to  obtain  permission  from  owner  of  land  to  remove 
them. 

61.  Wire  Service. — Employees  must  not  use  the  telegraph  unnecessarily.  All  messages 
must  be  as  brief  as  is  consistent  with  a  clear  understanding  of  their  meaning.  Messages 
referring  to  personal  affairs  are  not  to  be  offered  for  transmission  on  Company  wires, 
except  in  case  of  accident  or  sickness. 

62.  Position  of  Derail. — Employees  must  notice  side  track  derails  and  see  that  they 
are  set  to  derail  and  locked  in  that  position. 

63.  Re-lighting  Signal  Lamps. — An  employee  finding  an  oil-burning  signal  or  switch 
lamp  not  burning  between  sunset  and  sunrise,  must  light  it  immediately  and  report  it  to 
the  section  foreman  or  signal  maintainer. 

64.  Keep  Stock  off  Right-of-way. — Employees  must  drive  stock  off  the  right-of-way 
and  close  any  farm  gates  left  open. 

Reports 

70.  Reporting  Nonobservance  of  Signals. — Disregard  of  stop  or  caution  signals, 
excessive  speed  of  trains,  or  failure  to  answer  signals  properly  must  be  reported,  with  a 
full  statement  of  facts. 

71.  Reporting  Violation  of  Rules. — Any  violations  of  the  rules,  regulations  or  in- 
structions, or  any  misconduct,  irregularities  or  negligence  affecting  the  interest  of  the 
Company  must  be  reported. 

72.  Reporting  Defects. — Any  defect  discovered  in  track,  bridge  or  signals,  any  failure 
of  fuel  or  water  supply,  or  any  other  condition  noted,  that  may  hinder  the  movement  of 
trains,  must  be  reported  promptly  by  wire  to  the  proper  officers.  In  case  the  passage  of 
trains  is  endangered,  employees  must  remain  and  protect  traffic  until  reUef  can  be  secured. 

73.  Public  Improvements  and  Ordinances. — The  proper  officer  of  the  Company  must 
be  informed  promptly  regarding  contemplated  pubhc  improvements  or  ordinances  which 
would  in  any  way  affect  its  interests.  Supervisors,  foremen  and  other  employees  must 
make  prompt  report  and  forward  at  once  to  their  immediate  superiors  any  printed  public 
notice,  or  other  matter  pertaining  to  such  improvements  or  ordinances,  with  all  the 
information  available. 

Accidents  and  Emergencies 

80.  Assumption  of  Authority. — In  case  of  accidents  or  other  emergencies  prompt 
action  is  essential.  In  the  absence  of  designation,  the  employee  upon  whom  the  responsi- 
bility most  naturally  falls  must  assume  authority  until  the  arrival  of  a  superior  officer. 
In  case  of  an  accident  or  menace  to  a  passenger  train  he  must,  when  necessary,  see  that 
all  passengers  are  removed  to  a  place  of  safety,  render  all  assistance  possible,  police  the 
location,  cause  the  removal  or  prevent  the  approach  of  all  lights,  open  flames  or  fires 
other  than  closed  electric  lights  where  there  is  danger  of  a  fire  or  explosion,  notify  the 


Rules    and    Organization 519 


local  fire  and  police  authorities  and  keep  all  unauthorized  persons  away.  Any  material 
which  may  be  of  use  in  determining  the  cause  of  accident  must  be  preserved  and  state- 
ments secured  from  employees  and  others  who  witnessed  the  accident.  He  must  report 
fully  to  his  superior  all  facts  and  particulars  necessary  for  a  clear  understanding  and 
make  such  suggestions  as  will  be  helpful. 

81.  Witnesses  to  Accidents. — Every  reasonable  effort  must  be  made  to  procure  the 
names  and  addresses  of  all  persons,  whether  employees  or  others,  who  witness  an  accident. 

82.  Accident  Information. — Employees  who  witness  or  have  any  knowledge  what- 
ever of  an  accident,  should  refrain  from  giving  information  to  the  injured  person  or 
anyone  else  except  the  Company's  officers  and  claim  agents,  unless  legally  required.  Per- 
sons seeking  information  should  be  referred  to  the  claim  agent  or  other  officer  of  the 
Company. 

83.  Watchmen  at  Accidents.— In  case  of  damage  to  a  train  or  structure,  wherein 
the  security  of  freight  or  property  is  involved,  it  is  the  duty  of  all  concerned  to  see  that 
watchmen  are  immediately  stationed  and  that  arrangements  are  promptly  made  for 
protection  against  theft  or  loss  from  other  causes. 

84.  Unusual  Conditions. — Any  employee  having  reason  to  believe  that  the  safety  of 
the  track  or  any  structure  is  endangered  by  flood,  fire  or  other  cause,  before  permitting 
its  use,  must  make  a  personal  inspection,  using  all  precautions  in  the  interest  of  life  and 
property. 

85.  Defective  Equipment. — When  accidents  occur  that  may  have  been  caused  by 
defective  equipment,  appliances,  tools  or  machinery,  such  equipment,  tools,  etc.,  must  be 
examined  immediately  by  the  person  in  charge  to  ascertain  their  condition.  Any  defective 
equipment,  appliance,  tool  or  machinery,  or  the  defective  part  thereof  involved,  must  be 
so  marked  as  to  be  readily  identified,  and  be  withheld  from  further  use,  without 
modification,  for  investigation. 

86.  Injuries  to  Trespassers. — ^When  trespassers  are  injured  they  should  be  turned 
over  to  county  or  town  authorities.  If  this  cannot  be  done,  any  available  doctor  should 
be  called.  He  should  be  informed  that  the  railroad  company  will  be  responsible  for 
emergency  attention  only. 

87.  Deaths  from  Accidents. — In  case  of  death  from  accident  or  otherwise,  employees 
must  see  that  the  body  receives  appropriate  care  and  is  removed  as  soon  as  possible  to 
proper  place  and  left  in  charge  of  proper  officer  or  an  agent  of  the  Company,  unless 
there  is  a  local  or  state  law  forbidding  the  removal  of  the  body  prior  to  the  arrival  of 
the  coroner  or  other  public  ofiicial  with  like  functions. 

SUPERVISORY  OFFICERS  AND  FOREMEN 

90.  Books  of  Rules  and  Regulations. — Supervisory  employees  must  be  fully  con- 
versant with  the  rules  and  regulations,  must  see  that  subordinates  who  should  have  copies 
are  supplied,  and  see  that  they  are  receipted  for,  understood  and  complied  with  by  those 
under  them. 

91.  Supervision. — Supervisors  shall  see  that  foremen  and  others  under  their  super- 
vision are  properly  supplied  with  tools  and  material  necessary  for  the  efficient  perform- 
ance of  their  duties,  and  that  they  fully  understand  and  properly  perform  the  work 
assigned  to  them. 

92.  Advise  Whereabouts. — Supervisory  officers  and  foremen,  when  away  from  head- 
quarters, must  keep  their  superiors  advised  of  their  whereabouts. 

93.  Govern  Conduct  of  Men. — Foremen  shall  govern  the  conduct  of  their  men  at 
all  times  while  on  Company  property,  and  be  responsible  for  the  safe,  proper  and  eco- 
nomical performance  of  the  work  assigned  to  them. 


520 Rules   and    Organization 

94.  Select  and  Instruct  Men. — Foremen  must  select  their  men  with  care,  choosing 
only  able-bodied  men  of  proper  age,  alert  and  physically  sound,  in  accordance  with  the 
rules  governing  employment,  and  endeavor  to  secure  those  who  will  develop  into  satis- 
factory employees.  They  must  instruct  their  men  in  safe  work-methods  and  see  that  they 
thoroughly  understand  all  safety  rules. 

95.  Remain  with  Men. — Foremen  while  on  duty,  unless  otherwise  directed,  must 
remain  with  their  men  and  personally  superintend  their  activities. 

96.  Training  Substitute. — Each  foreman  should  train  at  least  one  of  his  men  to  fill 
his  place  in  case  of  necessity. 

97.  Substitute  Foremen. — Foremen  must  not  absent  themselves  from  duty  without 
permission.  If  called  from  their  work  by  sickness  or  other  emergency,  they  must  leave 
their  most  reliable  man  in  charge  of  the  gang  and  notify  their  superior  officer  by  wire, 
giving  him  the  name  of  the  man  left  in  charge. 

98.  Avoidance  of  Accidents. — Foremen  or  others  in  charge  of  employees  working  on 
or  about  tracks,  must  instruct  their  men  to  be  alert,  watchful,  and  to  avoid  accidents; 
and  must  take  the  necessary  precautions  to  see  that  all  men  working  under  their  imme- 
diate supervision  receive  warnings  of  approaching  trains  in  time  to  reach  a  place  of  safety. 

99.  Handling  of  Work. — Foremen  will  be  held  responsible  for  the  selection  of  prop- 
erly qualified  men,  must  instruct  them  to  perform  specific  tasks,  and  see  that  work  is 
performed  in  accordance  with  the  rules,  regulations  and  instructions.  They  must  person- 
ally supervise  the  handling  of  all  heavy  material  and  the  performing  of  the  more  hazard- 
ous work.  They  must  plan  such  work  carefully,  using  the  most  competent  men  for  the 
more  important  tasks.  When  men  are  engaged  in  joint  work,  the  foremen  must  see  that 
each  man  has  a  thorough  understanding  of  how  the  work  is  to  be  done  and  the  moves 
to  be  made  by  each.  When  signals  or  instructions  are  necessary  they  will  be  given  by  the 
foreman  personally,  or  by  his  personal  delegate,  the  others  remaining  silent.  In  such 
work  the  foreman  shall  give  special  attention  to  inexperienced  men,  teaching  them  to 
work  safely  with  the  others. 

100.  Joint  Work. — ^When  two  or  more  gangs  are  assembled  on  joint  work,  the 
proper  supervisory  officer  must  delegate  one  of  the  foremen  to  take  complete  charge,  and 
this  foreman  shall  be  responsible  for  the  proper  handling  of  the  work  and  safety  of 
the  men. 

101.  Coordination  of  Work. — When  work  is  to  be  performed  by  one  organization 
which  requires  the  assistance  of  another,  they  shall  cooperate  in  the  conduct  of  such 
work  and  shall  give  each  other  proper  notice  to  insure  efficient  prosecution  of  the  work. 

102.  Confusion  of  Signals. — When  gangs  are  working  close  together,  care  must  be 
taken  to  prevent  confusion  of  signals.  The  foremen  must  confer  and  arrange  for  full 
protection  of  the  work  as  provided  by  the  rules.  Both  foremen  will  be  held  responsible 
for  any  confusion  of  signals. 

103.  Signal  Interference. — When  work  is  to  be  done  which  may  disturb  interlocking 
or  signal  apparatus,  the  signal  maintainer  must  be  notified  as  far  in  advance  as  possible, 
and  the  foreman  must  cooperate  with  him  in  such  work.  If  telegraph  or  telephone  faciU- 
ties  are  to  be  disturbed  the  dispatcher  must  be  notified  in  advance  and  such  work  done 
with  cooperation  of  the  linemen.  When  a  crossing  alarm  bell  is  out  of  order,  or  if  it 
becomes  necessary  to  spike  an  interlocked  switch  or  derail,  the  foreman  must  make 
prompt  wire  report  to  the  proper  officers. 

104.  Proper  Signaling  Appliances. — Foremen  must  know  that  their  gangs,  track- 
walkers and  watchmen  are  always  supplied  with  proper  signaling  appliances  and  must 
instruct  employees  as  to  their  use. 


Rules   and   Organization 521 

105.  Overhead  Work. — Foremen  must  see  that  employees  working  overhead  take 
special  precautions  to  prevent  falling,  that  they  have  safe  footing  and  take  no  unnecessary 
chances. 

106.  Working  in  Tanks  or  Pits. — While  men  are  working  in  tanks,  excavations  or 
other  places,  where  assistance  or  attendance  is  necessary  for  safety,  the  foremen  must  see 
that  such  assistance  or  attendance  is  provided. 

107.  Supplying  and  Using  Goggles. — Foremen  and  supervisory  officers  must  see  that 
employees,  whose  work  requires,  are  equipped  with  goggles,  and  that  they  are  worn 
when  the  employees  are  engaged  in  any  work  where  their  eyes  may  be  endangered. 

108.  Report  Personal  Injuries. — In  case  of  injury,  however  slight,  to  himself  or  to 
anyone  under  his  supervision,  or  in  case  of  injury  to  others  which  has  not  been  reported 
by  other  employees,  the  foreman  must  immediately  make  a  report  by  wire  to  his  super- 
visor, followed  by  a  written  report  on  the  prescribed  form. 

109.  Reporting  Accidents. — All  accidents  must  be  fully  reported  on  the  form  provided 
for  that  purpose. 

110.  Responsibility  for  Tools  and  Material. — Foremen  will  be  held  responsible  for 
care  and  proper  and  economical  use  of  all  tools  and  material  furnished  them.  When  these 
are  received,  they  must  be  carefully  inspected  and  checked  against  invoice.  Foremen 
must  anticipate  their  needs,  keep  their  superior  officers  informed  as  to  their  requirements 
and  must  report  promptly  anything  defective,  any  loss  or  any  unnecessary  accumulation 
of  tools  or  material. 

111.  Reports. — Foremen  must  keep  the  required  records  and  make  the  prescribed 
reports  of  the  time  of  their  men,  and  of  the  receipt,  distribution,  and  use  of  tools  and 
material  furnished  them. 

112.  Examine  Equipment. — Foremen  must  examine  ropes,  cables,  chains  and  other 
lifting  equipment  before  using  and  be  sure  they  are  free  from  defects. 

113.  Avoid  Delaying  Traffic. — Except  in  case  of  emergency,  repairs  to  track,  bridges 
or  other  structures  must  be  made,  when  practicable,  at  such  time,  and  in  such  manner, 
as  will  avoid  delay  to  trains. 

114.  Standards  and  Plans. — Foremen  must  conform  to  the  prescribed  standards, 
plans  and  specifications  in  the  execution  of  work  under  their  charge. 

SAFETY 

120.  Safeguarding  Life  and  Property. — The  safeguarding  of  life  and  property  is  of 
first  importance.  The  first  duty  and  responsibility  of  employees  is  to  prevent  accidents, 
even  though  in  so  doing  they  may  necessarily  be  performing  the  duty  of  others.  Unsafe 
practices  must  be  avoided.  In  case  of  doubt  the  safe  course  must  be  taken. 

121.  Reporting  Unsafe  Conditions. — Employees  must  keep  a  lookout  at  all  times  for 
conditions  which  might  result  in  injury  to  persons,  and  if  possible  correct  them  promptly. 
If  they  cannot  be  corrected  immediately  they  must  be  reported  and  protected  to  insure 
safety  until  remedied. 

122.  Keep  Tracks  and  Structures  Clear. — Materials  or  tools  must  not  be  left  un- 
guarded on  station  platforms  or  walkways,  nor  along  the  tracks  where  they  may  interfere 
with  the  safe  passage  of  trains  or  the  safe  footing  of  persons. 

123.  Working  in  Tunnels. — Employees  working  in  or  near  the  end  of  a  tunnel,  when 
a  train  approaches  from  either  direction,  must  stand  clear  of  all  tracks,  and  if  in  a  tunnel 
must  occupy  the  refuge  niches  if  available.  If  there  is  insufficient  clearance  or  no  refuge 
niche,  arrangements  must  be  made  to  work  under  flag  protection.  Employees  must  carry 
lights  when  passing  through  any   tunnel   where  men   cannot   readily   be  seen.  When  an 


522 Rules    and    Organization 

entire  gang  is  working  close  together,  an  adequate  number  of  lights,  not  less  than  two, 
must  be  used. 

124.  Electric  Wires. — Repairs,  changes  or  adjustments  of  electrical  apparatus  shall 
be  made  only  by  employees  experienced  in  electrical  work  and  authorized  to  do  such 
work.  When  employees  are  in  doubt  as  to  their  safety  near  electric  wires  or  apparatus, 
they  should  notify  the  electrical  department  before  commencing  any  work.  They  must 
avoid  dangling  wires  which  may  be  charged  with  electricity.  If  necessary  to  lift  such  a 
broken  wire  they  must  use  a  dry  board  or  some  non-conducting  substance.  They  must 
inform  themselves  as  to  any  high-voltage  wires  installed  on  or  near  the  right-of-way  and 
must  use  due  care  to  avoid  injury  therefrom. 

125.  Keep  in  Clear  of  Trains. — ^Upon  the  approach  of  trains,  men  working  on  or 
near  the  tracks  must  promptly  move  to  a  place  of  safety.  Those  whose  duties  require 
them  to  walk  track,  where  there  are  two  or  more  tracks,  shall,  when  practicable,  walk 
against  the  current  of  traffic,  keeping  sharp  lookout  in  both  directions  for  approaching 
trains.  When,  due  to  storms,  snow,  fog,  engines,  cars  or  permanent  obstructions,  approach- 
ing trains  cannot  readily  be  seen,  extra  care  must  be  taken  to  prevent  accidents. 

126.  Crossing  Tracks. — Employees  must  look  in  both  directions  for  approaching 
trains,  locomotives  or  cars  before  crossing  tracks,  and  when  crossing  tracks  in  front  of 
or  behind  standing  cars  or  locomotives,  must  allow  sufficient  distance  to  cross  in  safety. 

127.  Avoid  Passing  Over,  Under  or  Between  Cars. — Employees  must  not  climb  over, 
between,  or  get  under  cars  without  adequate  protection. 

128.  Protruding  Nails. — Nails  must  not  be  left  protruding  where  they  may  cause 
injury. 

129.  Use  of  Goggles. — Wherever  goggles  are  provided  for  protection  while  doing 
certain  classes  of  work,  they  must  be  worn  as  instructed. 

130.  Safety  Belts. — ^Wherever  safety  ropes  or  belts  are  provided,  they  must  be  used 
by  employees  as  instructed  when  working  on  poles,  or  in  other  similar  work. 

131.  Swinging  Tools. — When  using  a  swinging  tool,  avoid  endangering  others.  If 
necessary  to  work  or  pass  within  range  of  a  swinging  tool,  first  advise  the  user  of  the 
tool  of  your  presence  and  exercise  care  to  avoid  injury. 

132.  Do  Not  Step  or  Walk  on  iJaf/^.— Employees  must  not  step  or  walk  on  rails. 

133.  Do  Not  Watch  Welders. — Employees  must  not  look  at  the  electric  or  oxyacety- 
lene  flame  with  the  naked  eye. 

134.  Open  Flames  Near  Explosives. — Employees  must  avoid  smoking  or  the  use  of 
open  flames  in  or  near  manholes  where  gas  may  be  present  or  around  gasoline,  oxygen 
or  acetylene  tanks. 

135.  Cutting  Rivets,  Bolts  and  Scrap. — When  cutting  off  rivets  or  bolts,  or  cutting 
up  scrap,  employees  must  use  such  protection  as  necessary  to  prevent  injury  from  flying 
pieces. 

136.  Handling  Tools  and  Materials  Overhead. — Employees  working  overhead  should 
be  careful  to  prevent  tools  or  material  from  falling,  and  should  not  drop  objects  without 
ample  warning. 

137.  Excavation  Protection. — Excavations  must  be  properly  protected  when  neces- 
sary to  leave  them  open,  and  must  be  filled  as  promptly  as  possible. 

138.  Placing  Torpedoes.— Torpedoes  must  not  be  placed  near  stations,  road  cross- 
ings, or  at  other  locations  where  persons  are  likely  to  be  injured  by  them,  except  when 
necessary  to  prevent  accidents.  All  unexploded  torpedoes  found  on  Company  premises 
not  attached  to  track  rail  must  be  picked  up. 

139.  Storing  Torpedoes. — Torpedoes  and  fusees,  when  not  in  use,  must  be  stored 
where  outsiders  cannot  reach  them. 


Rules    and    Organization  523 

STANDARD  WATCHES 

150.  Use  Standard  Watches. — Watches  that  have  been  examined  and  certified  to  by 
a  designated  inspector  must  be  used  by  all  supervisors  and  foremen  and  by  such  other 
employees  as  may  be  designated  by  special  instructions.  The  certificate  in  prescribed 
form  must  be  renewed  and  filed  with  the every 

151.  Compare  Watches. — Foremen,  or  others,  required  to  carry  standard  watches 
who  are  not  accessible  to  standard  clocks,  must  compare  their  watches  daily  so  far  as 

practicable  with  a  clock  designated  by   or  with  dispatchers,  conductors 

or  enginemen. 

TIME-TABLES 

155.  Employees  Must  Have  and  Understand  Time-Tables. — Employees  whose  duties 
are  in  any  way  affected  by  the  time-table  must  have  a  copy  of  the  current  time-table 
with  them  while  on  duty.  They  must  be  conversant  with  and  obey  the  rules  and  special 
instructions  contained  therein. 

156.  Destroy  Old  Time-Tables. — Time-tables  that  have  been  superseded  must  be 
destroyed. 

SIGNALS 

160.  Proper  Signaling  Appliances. — Employees  whose  duties  may  require  them  to 
give  signals,  must  provide  themselves  with  the  proper  appliances,  keep  them  in  good 
order  and  ready  for  immediate  use. 

161.  Signals. — Flags  of  the  prescribed  color  must  be  used  by  day,  and  lights  of  the 
prescribed  color  by  night. 

162.  Day  and  Night  Signals. — Day  signals  must  be  displayed  from  sunrise  to  sunset, 
but  when  day  signals  cannot  be  plainly  seen,  night  signals  must  be  used  in  addition. 
Night  signals  must  be  displayed  from  sunset  to  sunrise. 

163.  Color  Signals. — See  rule  No.  10  Standard  Code  AAR. 

164.  Hand,  Flag  and  Lamp  Signals. — See  rule  No.  12  Standard  Code  AAR. 

165.  Violent  Signals. — Any  object  waved  violently  by  anyone  on  or  near  the  track 
is  a  signal  to  stop. 

166.  Engine  Whistle  Signals. — See  rule  No.  14  Standard  Code  AAR. 

167.  Use  of  Torpedoes. — The  explosion  of  two  torpedoes  is  a  signal  to  proceed  at 
reduced  speed.  The  explosion  of  one  torpedo  will  indicate  the  same  as  two,  but  the  use 
of  two  is  required. 

168.  Classification  Signals. — All  sections  of  trains,  except  the  last,  will  display  two 
green  flags  and  in  addition,  two  green  lights  by  night,  in  the  places  provided  for  that 
purpose  on  the  front  of  the  engine.  Extra  trains  will  display  two  white  flags  and,  in 
addition,  two  white  lights  by  night  in  the  places  provided  for  that  purpose  on  the  front 
of  the  engine. 

169.  Switch  Targets. — Main  track  switch  targets  will  show  green  or  no  indication 
when  switches  are  set  for  the  main  track,  and  red  when  set  for  side  tracks,  crossings  or 
junction  tracks.  All  other  switch  targets  will  show  green  (or  no  indication)  and  yellow. 

USE  OF  SIGNALS 

175.  Imperfectly  Displayed  Signal. — A  signal  imperfectly  displayed,  or  the  absence 
of  a  signal  at  a  place  where  a  signal  is  usually  shown,  must  be  promptly  reported  to 
the   


524 Rules    and    Organization __^_ 

176.  Crossing  Watchman. — ^Watchmen  stationed  at  public  crossings  at  grade  must 
use  stop  signals  when  necessary  to  stop  trains.  They  will  use  prescribed  signals  to  stop 
highway  traffic. 

177.  Flagmen. — The  following  signals  will  be  used  by  employees  when  flagging: 

Day  Signals — A  red  flag,  torpedoes  and  fusees. 
Night  Signals — A  red  light,  torpedoes  and  fusees. 

FLAGGING 

180.  To  Stop  Trains. — When  a  track  for  any  cause  is  unsafe  for  the  passage  of 
trains  at  normal  speeds,  an  employee,  with  proper  flagman's  signals,  must  be  sent  in 
each  direction  a  sufficient  distance  to  insure  full  protection,  placing  two  torpedoes  and, 
when  necessary,  in  addition,  displaying  lighted  fusees.  In  addition,  appropriate  stop  or 
slow  signals  shall  be  displayed  at  the  point  to  be  protected.  Crossovers  or  junction  points 
between  the  flagmen  and  the  unsafe  track  must  also  be  protected. 

181.  Recalling  Flagmen. — Foremen  must  know  that  flagmen  are  out  the  required 
distance  before  breaking  or  obstructing  the  track,  and  the  flagmen  must  not  be  recalled 
by  motions,  but  must  remain  at  their  posts  and  protect  until  other  employees  under  the 
jurisdiction  of  the  same  foreman  have  verbally  notified  each  of  them  that  the  track 
is  safe. 

182.  Removing  Torpedoes.— Flagmen,  when  recalled,  must  remove  the  torpedoes 
placed  by  them. 

183.  Temporary  Restricted  Speed  Signs. — To  facilitate  the  movement  of  trains  over 
portions  of  track  not  in  condition  for  normal  speed,  standard  temporary  slow  signs  may 
be  used  to  control  the  speed  of  trains  over  such  track  when  authorized  by  bulletin 
issued  by  the  superintendent  giving  location  and  speed. 

184.  Resume  Speed  Sign. — A  resume  normal  speed  sign,  painted  green  and  display- 
ing a  green  light  by  night,  shall  be  placed  on  the  engineman's  side,  ....  feet  beyond  the 
protected  track  to  indicate  that  normal  speed  may  be  resumed. 

TOOLS  AND  MATERIAL 

190.  Use  of  Tools  and  Material. — Tools  and  material  must  not  be  loaned,  disposed 
of  or  used  in  any  unauthorized  manner  except  under  special  instructions  from  the  proper 
authority. 

191.  Requisitions. — Requisitions  should  be  made  sufficiently  early  to  avoid  delay  to 
the  work.  The  items  desired  should  be  fully  described,  making  reference  where  practicable 
to  standard  drawings. 

192.  Release  Cars  Promptly. — Carload  shipments  must  be  unloaded  promptly,  cars 
released  and  the  agent  notified. 

193.  Surplus  and  Second-Hand  Material. — Serviceable  second-hand  and  surplus  ma- 
terials, defective  tools  and  scrap  must  be  collected  and  disposed  of  according  to 
instructions. 

194.  Passenger  Train  Shipments. — The  shipment  of  heavy  or  bulky  material  by 
passenger  trains  should  be  avoided,  except  in  cases  of  emergency. 

195.  Defective  Material. — When  defective  material  or  material  unsuited  for  the  pur- 
pose is  observed  it  must  be  reported  to  the  supervising  officer  and  must  not  be  used 
except  on  special  instructions. 

196.  Loading  Material. — Cars  must  not  be  loaded  beyond  their  load  limit,  must  be 
safely  loaded  and  with  the  load  distributed  as  uniformly  as  practicable. 


Rules    and    Organization 525 

197.  Unloading  Material. — Care  must  be  exercised  in  unloading  material  to  keep  the 
car  sufficiently  balanced  to  avoid  derailment. 

198.  Piling  Material. — Materials  must  be  piled  in  places  designated  for  that  purpose, 
a  safe  distance  from  the  track. 

199.  Piling  Forest  Products. — Lumber,  timber,  ties  and  piling  must  be  piled  in 
accordance  with  instructions. 

200.  Combustible  Material. — Combustible  material  should  be  piled  at  a  safe  dis- 
tance from  telegraph,  telephone  and  signal  lines,  preferably  on  the  opposite  side  of  the 
track  from  such  lines.  Adjacent  ground  must  be  kept  free  from  vegetation  for  sufficient 
distance  to   protect  from   fire. 

201.  Distribution  of  Material. — When  necessary  to  leave  over  night,  material  dis- 
tributed close  to  track,  in  the  vicinity  of  switches  or  in  yards,  notice  must  be  given. 

202.  Rubbish. — Rubbish  must  be  cleaned  up  promptly  and  disposed  of  properly 
with  due  regard  to  fire  hazard. 

203.  Safekeeping  of  Tools. — All  tools  and  supplies,  when  not  in  use,  must,  as  far  as 
practicable,  be  kept  locked  in  the  tool  box  or  tool  house  provided  for  the  purpose,  or 
where  they  can  be  carefully  watched. 

204.  Use  of  Tools. — Employees  must  observe  the  condition  of  tools  and  equipment 
which  they  are  to  use.  Defective  tools  should  not  be  used. 

205.  Use  of  Sledges. — Track  chisels  or  other  tempered  tools  should  not  be  struck 
with  a  spike  maul.  Sledges  provided  for  that  purpose  should  be  used. 

206.  Instruments. — Electrical  or  other  delicate  instruments  must  be  handled  with 
extreme  care,  and  when  shipped  must  be  packed  in  accordance  with  instructions. 

ROADWAY  MACHINES  AND  WORK  EQUIPMENT 

230.  Familiarity  with  Machine. — The  operator  must  famiharize  himself  with  all 
parts,  detail  adjustments,  and  lubrication  of  the  machine  to  which  he  is  assigned. 

231.  Cleaning  and  Lubricating. — It  is  the  duty  of  every  man  in  charge  of,  or  oper- 
ating, a  machine  to  keep  it  clean  and  well  lubricated,  using  proper  equipment  for  han- 
dhng  and  applying  lubricants.  The  lubricants  used  must  comply  with  current  instructions 
or  chart.  The  receipt  of  a  machine  in  dirty,  unoiled,  or  poor  running  condition  must  be 
reported  promptly  to  the  proper  officer. 

232.  Shipments. — Gasoline  tanks  and  carburetors  of  machines  must  be  drained 
before  shipment. 

233.  Fouling  Track. — A  machine  must  not  foul  or  obstruct  any  track  before  proper 
permission  is  obtained  and  protection  provided. 

234.  Lock  Booms. — Swinging  portions  of  cranes  or  other  similar  equipment  must  be 
locked  or  mechanically  fastened,  with  the  boom  of  cranes  parallel  to  the  center  line  of 
track  during  the  approach  and  passing  of  trains  on  adjacent  tracks. 

235.  Operations  Endangering  Wires. — Employees  handhng  derricks  or  pile  drivers, 
or  doing  work  Hkely  to  interfere  with  communication  or  power  wires,  must  use  every 
precaution  to  prevent  damage. 

236.  No  Riders. — Operators  must  see  that  no  one  rides  on  cranes  or  other  similar 
equipment  except  when  necessary  in  the  discharge  of  duty. 

237.  Inspection. — Frequent  inspections  of  all  machinery,  cables,  etc.,  must  be  made 
by  the  operator  so  that  repairs  may  be  made  when  necessary. 

238.  Load  Limits. — Loads  heavier  than  indicated  by  the  body  plate  on  the  machine 
should  not  be  attempted. 


526 Rules    and    Organization 

239.  Blocking. — ^When  heavy  loads  are  to  be  handled,  operator  must  assure  himself 
that  the  machine  is  properly  blocked  and  that  the  brakes  are  set. 

240.  Safety  Guards. — Operator  must  keep  all  safety  guards  in  place  when  the 
machine  is  working. 

MOTOR  CARS,  VELOCIPEDES,  HAND  AND  PUSH  CARS  (TRACK  CARS) 

250.  Terminology. — Unless  otherwise  indicated  the  term  "track  car,"  where  used 
herein  will  apply  to  motor  cars,  hand  cars,  velocipedes,  trailers  and  push  cars. 

251.  Running  on  Foreign  Lines. — Track  cars  must  not  be  run  over  foreign  lines 
unless  permission  has  been  secured  from  proper  supervising  officer. 

252.  Use  for  Company  Business. — Track  cars  must  be  used  only  for  company  busi- 
ness. None  but  employees  in  the  discharge  of  their  duties  shall  be  permitted  to  use  or 
ride  upon  track  cars  except  with  proper  authority. 

253.  Responsibility. — Employees  to  whom  track  cars  are  assigned  are  responsible  for 
proper  use  and  condition  of  cars  in  their  charge.  A  report  must  be  made  to  their  superior 
officer  if  the  car  is  in  need  of  repairs. 

254.  Operators'  Qualifications. — No  one  except  a  responsible  employee  who  is  quali- 
fied and  has  been  authorized  will  be  allowed  to  operate  a  motor  car  upon  a  main  track. 

255.  Unauthorized  Attachments. — Foremen  and  operators  must  not  place  unauthor- 
ized attachments  on  their  track  cars. 

256.  Insulation. — Only  insulated  track  cars  shall  be  used  where  there  are  track 
circuits. 

257.  Shipment  on  Trains. — ^Where  necessary  to  ship  motor  cars  on  trains,  gasoline 
tanks  and  carburetors  must  be  drained. 

258.  Protection  of  Cars. — When  not  in  service  track  cars  must  be  protected  as  well 
as  possible  from  weather  and,  when  left  in  the  open,  must  be  locked. 

Operation  of  Track  Cars 

270.  Keep  Ready  for  Use. — Motor  cars  must  be  kept  ready  for  immediate  use  at  all 
times. 

271.  Inspection  Before  Starting. — Foreman  or  operator  must  inspect  his  car  care- 
fully before  starting  a  trip,  seeing  that  it  is  in  proper  operating  condition  and  properly 
equipped.  The  following  flagging  equipment  must  be  carried  on  all  motor  cars: 

Torpedoes 
Fusees 
Red  flags 
Red  lanterns 
White  lanterns 

Fusees  and  torpedoes  must  be  carried  in  proper  containers. 

272.  Loading  Tools  and  Material. — Tools  and  material  must  be  properly  placed  on 
track  cars  to  prevent  falling  off  or  interfering  with  free  operation  of  the  brakes. 

273.  Emergency  Handling. — There  should  be  a  thorough  understanding  as  to  the 
part  that  each  person  on  a  track  car  will  take  in  the  handling  of  the  car  and  as  to  the 
side  of  the  track  to  which  the  car  will  be  removed  if  an  emergency  should  arise 
necessitating  prompt  action. 

274.  Position  of  Men  on  Track  Car. — Each  man  in  a  regular  gang  should  be  assigned 
to  a  place  on  the  motor  car  where  he  will  ride.  Occupants  must  be  seated. 

275.  Look  Out  for  Following  Trains. — When  motor  cars  occupied  by  more  than  one 
man  are  running  on  the  main  track,  at  least  one  man  must  face  the  rear  and  keep  a  look 
out  for  following  trains. 


Rules    and    Organization 527 

276.  Look  Out  for  Obstructions. — A  sharp  look  out  must  be  kept  at  all  times  for 
obstructions  on  the  rail  that  are  hkely  to  derail  car,  and  for  workmen  on  or  near 
the  track. 

277.  Run  in  Direction  of  Traffic. — On  lines  of  more  than  one  main  track,  a  motor 
car  should  generally  move  with  the  current  of  traffic. 

278.  Throwing  Switches. — Main  track  switches  must  not  be  thrown  for  track  cars 
when  they  can  be  lifted  over. 

279.  Spring  Frogs  arid  Switches. — Track  cars  should  not  be  run  under  power 
through  spring  side  of  frogs  or  spring  switches. 

280.  Remote  Controlled  Switches. — Track  cars  must  be  stopped  before  passing  over 
remote  controlled  switches  and  then  pushed  through. 

281.  Interlocked  Derail  and  Switches. — Track  cars  must  be  stopped  before  passing 
over  interlocked  derails  and  switches. 

282.  Approaching  Crossings. — When  approaching  road  crossings  at  grade,  a  track 
car  must  be  under  complete  control  or  stopped.  If  the  crossing  is  protected  by  flagman, 
the  operator  must  get  the  signal  from  him  before  proceeding.  When  required  by  rule  or 
law,  a  proper  warning  must  be  given  when  approaching  highway  crossings  at  grade. 

283.  Passing  Standing  Trains. — Caution  must  be  used  in  passing  a  train  receiving 
or  discharging  passengers  at  a  station,  and,  except  where  proper  safeguards  are  provided, 
cars  must  not  pass  between  the  train  and  platform. 

284.  Follow  Spacing. — A  track  car  must  not  be  attached  to  an  engine  or  train  and 
must  not  be  run  closer  than  500  feet  behind  a  moving  train,  and  must  stop  not  less 
than  200  feet  from  a  standing  train.  Where  two  or  more  cars  are  traveling  uncoupled, 
the  space  between  cars  must  be  not  less  than  500  feet.  A  car  in  advance  must  not  be 
stopped  until  the  following  car  has  been  signaled. 

285.  Coupling  of  Trailers. — A  track  car  must  never  be  pushed  by  a  motor  car  re- 
gardless of  whether  the  motor  car  is  moving  ahead  or  backward,  unless  the  cars  are 
equipped  with  an  approved  type  safety  coupler.  Trailers  and  other  track  cars  being 
towed  must  be  coupled  with  an  approved  coupler.  Under  no  circumstances  must  a  make- 
shift coupler  be  used.  Hand  cars  should  not  be  coupled  to  motor  cars  except  in  emer- 
gency and  then  only  when  connecting  rod  has  been  disengaged  from  crank  and  made 
inoperative. 

286.  Caution  in  Use  of  Track  Cars. — Track  cars  shall  move  at  all  times  with  care 
necessary  for  safety,  expecting  trains  or  other  cars  to  appear  at  any  time  from  either 
direction  without  notice.  When  necessary  to  operate  them  in  foggy  weather,  severe 
storms,  or  at  night,  or  where  the  view  is  obstructed  in  any  way,  or  when  the  track  cars 
cannot  quickly  be  removed  from  track  because  of  heavy  load  or  insufficient  side  clear- 
ance, especial  care  must  be  used;  and  if  conditions  require,  cars  must  proceed  only  under 
flag  protection. 

287.  Night  Operation. — When  motor  cars  are  operated  at  night  or  during  storms  or 
fog,  or  through  tunnels,  they  must  be  equipped  with  a  white  light  in  front  and  a  red 
light  in  the  rear. 

288.  Replace  Torpedoes. — Torpedoes  exploded  or  damaged  by  track  cars  must  be 
replaced. 

289.  Protect  Track  Car  on  Track. — A  track  car  must  not  be  left  on  the  track  while 
men  are  at  work.  It  must  not  be  left  on  the  track  unprotected. 

290.  Removal  from  Track. — A  track  car  removed  from  track  must  be  placed  not 

less  than feet  from  nearest  rail.  It  must  not  be  left  standing  at  public  or  private 

crossings  in  a  position  that  will  interfere  with  the  travel-way. 


528 Rules    and    Organization 

291.  Safe  Loads. — ^Track  cars  must  not  be  overloaded.  Heavy  material,  ties,  etc., 
must  not  be  handled  on  motor  cars  except  in  extreme  emergencies. 

292.  Speed. — The  speed  of  motor  cars  must  not  exceed  that  at  which  the  cars  can 
be  stopped  within  the  limits  of  safety. 

293.  Handling  Car. — Care  must  be  exercised  in  placing  motor  car  on  and  off  the 
track  and  in  loading  or  unloading  tools. 

294.  Carbon  Monoxide  Gas. — Cars  must  not  be  run  in  closed  car  house,  as  carbon 
monoxide  gas  is  fatal. 

FIRE  PREVENTION  AND  PROTECTION 

310.  Protection  of  Property. — The  protection  of  the  property  of  the  Company 
against  fire  is  an  important  part  of  the  duty  of  every  employee  and  each  is  expected 
and  required  to  give  this  his  constant  and  personal  attention.  All  employees  should  be 
acquainted  with  the  nearest  city  or  Company  fire-alarm  box  and  be  thoroughly  familiar 
with  its  use. 

311.  Reporting  Fires. — Each  fire  must  be  promptly  reported  to  the  proper  officer  in 
order  that  thorough  investigation  of  causes  of  fire  can  be  made.  All  available  details 
must  be  supplied. 

312.  Fire  Fighting  Apparatus. — Fire-fighting  apparatus  must  be  kept  in  condition 
for  instant  use,  free  from  obstructions,  and  not  used  for  other  purposes  than  fighting  fire. 
Its  location  must  be  understood  by  all  employees  concerned.  Special  attention  must  be 
given  to  condition  of  hose,  hydrants,  alarm  systems  and  fire  pumps. 

313.  Fire  Hose. — Fire  hose  must  at  all  times  be  properly  maintained  and  ready  for 
instant  use.  All  fire  hose,  except  unlined  linen  hose,  should  be  tested  at  least  once  each 
year,  preferably  in  the  Spring.  The  hose  should  then  be  drained  and  the  cotton  covering 
allowed  to  become  thoroughly  dry  before  putting  back  on  reel  or  in  hose  compartment. 

314.  Fire  Extinguishers. — Fire  extinguishers  of  all  types  should  be  inspected  at  regu- 
lar intervals  and  any  defects  promptly  corrected.  Soda-acid  and  foam  type  extinguishers 
should  be  discharged  once  each  year  and  re-charged,  with  date  of  recharging  shown  on 
tag  attached  to  extinguisher.  Carbon  tetrachloride  extinguishers  should  be  given  annual 
tests  and  kept  filled  at  all  times. 

315.  Water  Barrels. — Water  barrels  equipped  with  buckets  must  be  kept  filled  and 
precaution  taken  against  freezing  by  dissolving  salt  or  calcium  chloride  in  the  water  in 
proper  proportions. 

316.  Sand  Pails  and  Scoops. — Dry  sand  with  scoops  must  be  maintained  where  oils, 
paints  or  inflammable  liquids  are  used  or  stored. 

317.  Inspections. — Frequent  inspections  should  be  made  of  grounds  and  buildings  to 
see  that  they  are  kept  clean  and  free  from  accumulation  of  debris  and  unneeded  materials 
which  might  cause  or  contribute  to  a  fire. 

318.  Metal  Receptacles  and  Lockers. — Standard  metal  receptacles  with  covers  should 
be  provided  for  ashes,  rubbish,  oily  rags  and  waste,  torches,  small  oil  suppHes  and  waste 
paper  towels.  Ventilated  lockers  should  be  provided  for  workmen's  clothing,  and  clothing 
should  be  suspended  from  hooks.  Metal  waste  baskets,  with  closed  sides,  should  be 
provided  in  offices  for  scrap  paper. 

319.  Disposition  of  Ashes  and  Rubbish.— Ruhhish,  ashes  and  sweepings  should  not  be 
allowed  to  accumulate  on  the  property,  but  should  be  disposed  of  daily.  Burning  of  rub- 
bish and  old  materials  must  be  done  with  due  regard  to  safety  of  buildings  and  material. 
Metal  screens,  trash  burners,  or  incinerators  should  be  used. 


Rules    and    Organization 529 


320.  Oil  Drippings  and  Friction  Hazards. — Combustible  materials  must  not  be  used 
as  an  absorbent  to  catch  oil  drippings  from  bearings  and  other  parts  of  machinery; 
metal  drip  pans  with  sand  should  be  provided.  All  belts  should  be  examined  to  prevent 
friction  against  combustible  materials  and  all  bearings  watched  for  heating. 

321.  Fire  Escapes,  Doors  and  Automatic  Devices. — Fire  escapes,  fire  lanes,  fire  doors 
and  shutters  must  be  kept  free  of  obstructions  at  all  times.  When  painting  or  white- 
washing is  being  done,  care  should  be  e.xercised  to  protect  fusible  links  on  fire  doors, 
windows  and  sprinkler  heads  from  being  covered  with  paint  or  whitewash. 

322.  No  Smoking. — Smoking  is  prohibited  in  shops,  coaling  stations,  piers,  wharves, 
warehouses,  storehouses,  freight  houses  and  record  rooms,  and  in  buildings  where 
explosives,  gasoline  or  volatile  liquids,  oils  or  paints  are  used  or  stored. 

323.  Electric  Installations  and  Inspections. — Electric  wiring  and  apparatus  must  be 
installed  and  maintained  in  accordance  with  the  regulations  of  the  National  Electrical 
Code.  Inspections  must  be  made  at  intervals  to  see  that  they  are  in  safe  condition  and 
kept  up  to  standard  requirements. 

324.  Electric  Wires. — Electric  wires  must  not  be  hung  on  nails  or  other  metal  fix- 
tures, or  where  they  may  come  in  contact  with  telephone,  telegraph  or  high-tension  wires. 
They  should  be  supported  by  and  hung  from  approved  insulators. 

325.  Vapor  Proof  Globes  and  Wire  Cage  Guards. — Electric  lamps  must  be  equipped 
with  vapor-proof  globes  in  oil  houses,  paint  rooms  or  other  locations  where  volatile 
hquids  are  handled  or  stored,  also  in  grain  elevators,  coal  docks,  coaling  stations  and 
other  structures  where  explosive  dust,  vapors  or  gas  may  exist.  The  use  of  open  lights 
in  these  locations  is  prohibited.  Electric  lamps  on  extension  or  drop  cords  in  stationery 
storehouses,  record  and  file  rooms,  or  similar  faciUties  must  be  equipped  with  wire  cage 
guards. 

326.  Switch  and  Fuse  Cabinets  and  Fuses. — Switch  panel  cabinets  and  fuse  boxes 
must  be  kept  closed  and  no  materials  stored  therein.  Fuses  must  not  be  exchanged  or 
replaced  with  larger  capacity  fuses  than  design  of  circuit  calls  for  as  established  by  the 
National  Electrical  Code. 

327.  Oil  Lamps  and  Lanterns. — Electric  Ughting  should  be  used  where  available.  Oil 
lamps,  when  used,  must  be  rigidly  and  securely  supported,  and  must  have  metal  fonts, 
with  metal  or  porcelain  shade.  Oil  lamps  or  lanterns  must  not  be  filled  while  burning  or 
near  any  open  flame.  Lamps  should  not  be  used  when  nearly  empty,  due  to  danger  of 
accumulation  of  explosive  gases. 

328.  Oil  Stoves  and  Lamps. — Lamps  or  stoves,  burning  gasoline,  oil  or  alcohol, 
should  not  be  used  except  by  special  permission.  Only  those  devices  having  the  approval 
of  the  Underwriters  Laboratories  should  be  permitted. 

329.  Chimneys,  Stoves  and  Stovepipes. — Stoves  should  be  installed  at  least  three  feet 
from  all  wood-work,  otherwise  wood-work  must  be  protected  by  asbestos  backed  metal 
shield  with  air  space  between  shield  and  wood-work.  Wood  flooring  underneath  stoves 

and  ranges  must  be  protected  by  metal  covering  extending   inches  on  all  sides. 

Stovepipes  must  be  riveted  at  the  joints  and  rigidly  installed  at  a  safe  distance  from 
combustible  material.  Particular  attention  should  be  given  to  protection  where  pipes 
pass  through  walls,  ceilings,  partitions  or  roofs.  Where  pipes  are  removed  from  chimneys, 
openings  must  be  closed  by  proper  size  flue  stops.  Chimneys  and  flues  shall  be  constructed 
and  maintained  in  accordance  with  National  Board  of  Fire  Underwriters'  rules  and 
regulations. 

330.  Stove  and  Chimney  Inspections. — All  heating  appliances  must  be  examined  every 
Fall  and  defects  corrected  before  the  appHance  is  used.    Chimney  inspection  should  be 


530 Rules    and    Organization 

made  at  this  time,  giving  special  attention  to  those  parts  of  the  chimneys  which  extend 
through  attic  and  roof. 

331.  Removal  of  Ashes. — Ashes  must  be  removed  promptly  from  stoves,  furnaces 
and  boiler  plants,  and  disposed  of  in  such  manner  that  they  will  not  come  in  contact 
with   combustible   material. 

332.  Steam  Pipes  and  Radiators. — Steam  pipes  and  radiators  must  be  properly  in- 
stalled and  supported  and  kept  clear  of  any  wood-work,  or  other  combustible  material 
and  should  have  sufficient  clearance  to  permit  cleaning  in  back  of  radiators  and  pipes. 
Steam  pipes  must  be  supported  by  metal  brackets  or  supports. 

333.  Oils,  Paints  and  Varnishes. — Where  practicable,  oils,  paints,  varnishes  and 
similar  compounds  must  be  kept  in  a  separate  storehouse. 

334.  Oil  House,  Dope  and  Paint  Room  Inspections. — Frequent  inspections  of  oil 
houses,  paint  rooms,  dope  and  reclaim  houses  must  be  made,  to  see  that  all  special 
instructions  and  rules  in  regard  to  them  are  being  fully  observed. 

335.  Storing  and  Handling  Volatile  Liquids. — Gasoline,  benzine,  naphtha,  benzol, 
distillate,  snow  melting  oil  and  similar  volatile  liquids  must  be  stored  in  a  separate 
isolated  building  and  used  only  from  Underwriters'  approved  type  safety  cans.  Open 
flames,  lamps,  lanterns  and  torches  will  not  be  permitted  where  volatile  liquids  are 
being  used. 

336.  Bulk  Oil  Stations  and  Loading  or  Unloading  Racks. — All  bulk  gasoline  and  oil 
stations,  and  gasoline  loading  and  unloading  racks  must  conform  to  federal,  state  and 
city  requirements. 

337.  Extinguishing  Oil  Fires. — For  extinguishing  an  oil  fire  use  foam,  carbon  dioxide 
or  carbon  tetrachloride  fire  extinguishers,  if  available,  otherwise  smother  with  steam,  wet 
blankets,  dry  earth,  sand  or  similar  material.  Except  where  fog  nozzles  are  provided 
water  should  not  be  used. 

338.  Parking  of  Automobiles. — Automobiles  must  not  be  housed  or  parked  in  other 
than  authorized  buildings  or  locations. 

339.  Fusees,  Torpedoes  and  Matches. — Fusees,  torpedoes  or  matches  must  be  kept 
separately  and  when  transported  must  be  placed  in  special  container  for  safe  handling. 

HANDLING  OF  EXPLOSIVES 

350.  Signs  and  Regulations. — Danger  signs  must  be  conspicuously  placed  on  all 
buildings  and  magazines  (above  the  roof  if  practicable),  in  which  explosives  are  stored, 
and  must  conform  to  federal,  state  and  city  requirements. 

351.  Storing  Explosives. — Explosives  must  be  stored  in  fire-resistant  magazines  a  safe 
distance  from  Company  buildings,  or  buildings  and  property  of  others  in  accordance 
with  the  law.  In  states  where  no  laws  are  in  effect,  the  American  Table  of  Distances 
shall  be  used.  When  dynamite  is  being  held  for  use  and  no  adequate  storage  facilities  are 
provided,  it  should  be  buried  in  the  ground  and  suitable  identification  and  warning  signs 
posted. 

352.  Keep  Supply  Limited. — The  supply  of  explosives  in  storage  should  be  kept  at 
the  minimum  for  the  requirements  and  be  removed  in  quantities  as  needed. 

353.  Storing  Fuses  and  Blasting  Caps. — Fuses  and  blasting  caps  must  not  be  stored 
in  the  same  building  with  explosives. 

354.  Qualifications  of  Employees. — The  supervisor  must  satisfy  himself  as  to  the 
qualifications  of  employees  assigned  to  the  handling  of  explosives. 

355.  No  Smoking  or  Use  of  Matches  and  Lights. — Employees  must  not  smoke  and 
must  not  light  matches  while  near  or  handling  explosives.  Lanterns  or  other  open  flames 
will  not  be  permitted  while  handling  explosives,  or  in  the  immediate  vicinity  of  maga- 


Rules    and    Or  ganization 531 


zines  or  storage  areas.  Electric  flash-lights  or  incandescent  lamps  with  wire  cage  guards 
must  be  used  exclusively. 

356.  Misfires  and  Partly  Exploded  Charges.— When  dynamite  or  other  explosives, 
due  to  having  become  frozen,  or  from  other  causes  fail  to  properly  explode,  all  or  part 
of  the  unexploded  charge  may  have  been  left  in  the  "bore"  or  hole  or  become  mixed 
with  broken  rock  or  dirt.  Such  unexploded  charges  are  liable  to  be  set  off  if  struck  with 
a  shovel  or  other  tool  and  cause  personal  injury  or  loss  of  life.  Such  unexploded  charges 
must  be  handled  in  accordance  with  the  rules  established  in  the  Institute  of  Makers  of 
Explosives  Handbook,  "Safety  in  Handling  and  Use  of  Explosives." 

357.  Thawing  Frozen  Dynamite. — Some  dynamite  is  hkely  to  freeze  when  its  tem- 
perature falls  below  SO  degrees  F.  Dynamite  of  such  temperature  must  be  considered  as 
frozen  and  should  be  thawed  in  an  approved  type  kettle.  The  kettle  must  not  be  placed 
near  a  lighted  lantern  or  other  open  flame.  The  water  compartment  must  be  filled  with 
water  of  such  temperature  that  the  oven  or  thawing  compartment  in  which  dynamite  is 
to  be  placed  will  not  be  higher  than  100  degrees  F.  The  thawing  compartment  must  be 
clean  and  dry  before  the  dynamite  is  placed  therein. 

358.  Transporting  Explosives  on  Track  Cars. — When  necessary  to  transport  explo- 
sives on  a  track  car,  the  car  must  be  run  slowly  and  where  view  of  track  from  front  or 
rear  is  insufficient  to  allow  ample  time  to  safely  remove  car  from  track  in  event  of  the 
approach  of  a  train,  it  must  be  protected  by  flagging. 

359.  Use  of  Explosives  on  Company  Property. — Dynamite  or  other  explosives  must 
not  be  used  on  Company  property  without  the  knowledge  and  consent  of  the  proper 
officer. 

SANITATION 

370.  Drinking  Water. — Care  must  be  taken  to  secure  drinking  water  that  is  safe  and 
free  from  contamination.  When  in  doubt  as  to  the  purity  of  water  for  drinking  pur- 
poses it  should  be  boiled  for  a  few  minutes  and  allowed  to  cool,  or  be  chlorinated, 
before  using. 

371.  Food  Protection.— Food  should  be  stored  and  prepared  in  spaces  protected  from 
flies,  and  so  far  as  practicable  eaten  in  such  spaces. 

372.  Camp  Sites. — Camp  sites  should  preferably  be  on  high  ground,  be  well  drained 
and  kept  in  clean  and  sanitary  condition. 

373.  Vermin. — To  prevent  and  exterminate  vermin,  camps  or  camp  cars  should  be 
cleaned  by  scrubbing  with  soap  and  hot  water,  and  the  bedding  should  be  aired  and 
sunned. 

374.  Toilets. — Where  temporary  toilets  are  provided,  a  suitable  trench  for  excretions 
shall  be  dug  and  the  bottom  covered  with  lime.  Excretions  should  be  covered  periodically 
with  lime,  or  with  earth  until  lime  is  available. 

PROCEDURE  IN  CASE  OF  PERSONAL  INJURIES 

390.  Summon  Doctor. — In  case  of  serious  personal  injury,  the  nearest  Company 
doctor  must  be  summoned  immediately.  If  a  Company  doctor  is  not  immediately  avail- 
able, the  most  available  doctor  must  be  called  to  render  emergency  attention,  until  the 
arrival  of  a  Company  doctor,  who  will  then  take  charge.  When  a  number  of  persons  are 
seriously  injured  doctors  as  needed  and  available  should  be  summoned. 

391.  Information  to  Doctor. — In  summoning  doctors,  information  as  to  the  number 
and  needs  of  the  injured  should  he  given. 

392.  Company  Doctor  Asstane  Charge.— Upon  arrival  of  the  Company  doctor,  he 
shall  assume  charge  of  the  injured. 


532 Rules   and    Organization 

393.  Fire  Department  Aid. — If  a  local  fire  department  is  available,  it  may  render 
valuable  assistance  and  should  be  called  on  for  aid  when  needed. 

394.  Minor  Injuries. — In  cases  where  injuries  are  minor,  the  patient  should  be  sent 
to  the  nearest  Company  doctor. 

395.  Employees  Go  to  Company  Doctor. — Employees  will  be  expected,  whenever 
able,  to  visit  the  Company  doctor  for  treatment,  except  where  their  residence  is  too  far 
away. 

FIRST  AID  TO  INJURED 

See  "First  Aid  Instructions  for  Railroad  Employees,"  approved  and  published  by 
Operating-Transportation  Division,  Association  of  American  Railroads,  30  Vesey  Street, 
New  York  City. 

II  ROADWAY  AND  TRACK 
Section  Foremen 

500.  Instructions. — Section  foremen  report  to  and  receive  instructions  from  the 
designated  officer. 

501.  Responsibility. — ^They  are  in  charge  of  and  responsible  for  the  safe  condition 
of  tracks,  roadway  and  right-of-way  on  their  sections,  and  for  the  economical  use  of 
labor  and  material  in  their  maintenance.  They  must  do  no  work  thereon  that  will 
interfere  with  the  safe  passage  of  trains,  except  under  proper  protection. 

502.  Inspection. — Unless  otherwise  provided,  they  must  go  over  their  sections  or 
send  a  competent  reliable  man  with  suitable  tools,  at  designated  intervals,  to  make  a 
thorough  inspection,  and  see  that  the  track,  culverts,  highway  crossings,  bridges,  fences, 
and  other  railway  property  are  in  safe  condition.  If,  in  their  judgment,  the  track  or  any 
bridge  or  culvert  is  not  safe,  they  must  at  once  put  out  proper  signals  to  warn  approach- 
ing trains,  notify  the  proper  officers  of  the  condition  and  do  everything  in  their  power 
to  make  the  necessary  repairs. 

503.  Accidents. — They  must,  in  case  of  accident,  immediately  proceed  to  the  scene. 
In  the  absence  of  a  ranking  officer,  the  section  foreman  on  whose  section  the  accident 
occurs,  will  have  charge  of  the  assembled  track  forces,  and  shall  be  responsible  for  the 
character  of  the  repairs  made. 

504.  Investigation. — ^They  must  investigate  all  accidents  resulting  in  derailment  or 
in  damage  to  the  track,  roadway,  or  structures  on  their  sections,  and  make  report. 

506.  Obstructions. — ^They  must  give  special  attention  to  points  where  obstructions 
are  likely  to  occur. 

507.  Storms. — They  must,  during  heavy  storms  or  high  water  whereby  tracks  or 
structures  are  likely  to  be  damaged,  patrol  their  sections  to  make  sure  that  the  track 
is  safe. 

508.  Watchmen. — They  must  see  that  watchmen  are  properly  detailed  to  patrol  the 
track,  watch  bridges  or  perform  other  duties,  whenever  necessary. 

Extra  or  Floating  Gang  Foremen 

515.  Instructions. — Extra  or  floating  gang  foremen,  in  charge  of  trackmen,  shall 
report  to  and  receive  instructions  from  the  designated  officer.  They  shall  perform  such 
duties  and  employ  the  number  of  men  as  directed. 

Watchmen 

520.  Instructions. — Track,  bridge  and  tunnel  watchmen  report  to  and  receive  instruc- 
tions from  the  designated  officer  or  employee. 


Rules    and    Organiz  ation 533 


Drainage 

525.  Roadbed.— Drainage  of  the  roadbed  is  essential  for  economical  maintenance  of 
track  and  must  be  given  careful  attention. 

526.  Ditches.— Bitches  should  be  provided  in  cuts  in  conformity  with  the  standard 
roadbed  sections  and  be  kept  open. 

527.  Drainage  of  Slopes. — Ditches  should  be  provided  where  necessary,  along  the 
tops  of  slopes  of  cuts  to  intercept  water  from  higher  ground. 

528.  Waterways. — Waterways  through  culverts,  under  bridges,  and  adjacent  thereto 
should  be  kept  clear  of  obstructions. 

Care  of  Roadway 

540.  Cross-section. — The  cross-section  of  the  roadway  should  conform  to  the  stand- 
ard plans  and  deviation  therefrom  must  not  be  made  without  proper  authority. 

541.  Vegetation. — Growth  of  vegetation  on  the  slopes  of  cuts  and  embankments 
should  be  encouraged  in  order  to  prevent  erosion.  When  erosion  damaging  roadbed  is 
discovered  protective  action  should  be  taken. 

Ties 

550.  Inspection. — The  selection  of  ties  to  be  renewed  must  be  made  by  careful  in- 
spection of  the  ties  in  track,  and  those  to  be  removed  designated  as  directed. 

556.  Installation. — All  ties  must  be  placed  in  track  square  to  line  of  rail,  spaced,  and 
lined  as  directed. 

557.  Handling. — Care  must  be  taken  to  prevent  damage  to  new  or  serviceable  ties. 

558.  Tie  Plugs.— Treated  tie  plugs  should  be  driven  into  all  holes  from  which  spikes 
have  been  drawn,  in  ties  that  are  to  remain  in  track. 

563.  Handling. — Ties  removed  from  track,  after  all  ties  plates  and  rail  fastenings 
have  been  removed,  shall  be  collected  and  held  for  disposition,  as  directed. 

568.  Distribution. — Ties  delivered  but  not  to  be  installed  within  a  short  time  must 
be  stacked  as  directed. 

Rail 

573.  Distribution. — ^When  distributing  rail  it  should,  as  far  as  practicable,  be  so 
placed  that  it  can  be  laid  with  the  least  handling.  Care  must  be  exercised  to  prevent 
damage  to  rails  during  handling. 

578.  Renewal. — Temperature  of  rail  shall  be  taken  with  rail  thermometer  and  open- 
ings provided  for  expansion  by  placing  expansion  shims  of  the  designated  thickness 
between  the  ends  of  the  rails. 

579.  Laying. — Rails  shall  be  laid  consecutively  to  line  and  gage,  one  rail  at  a  time 
wherever  practicable.  Joints  must  be  fully  bolted  and  bolts  drawn  up  before  spiking  the 
rail  and  joint  to  gage. 

580.  Closures. — Closures,  both  temporary  and  permanent,  shall  be  made  as  directed. 
587.  Gaging. — Correct  gage  is  essential  to  good  track  and  must  be  maintained. 

Joints  and  Bolting 

594.  Bolting. — All  main  track  joints  must  be  fully  bolted.  Care  must  be  taken  to 
maintain  prescribed  tension. 

597.  Washers. — Spring  washers  or  nut  locking  devices  should  be  used,  as  directed. 

598.  Step  Joints. — Compromise  or  step  joints  must  be  used  to  connect  adjoining 
rails  of  different  sections. 

599.  Holes. — All  holes  in  rails  must  be  drilled. 


534 Rules    and    Organization 

605.  Spikes. — Track  spikes  of  the  size  prescribed  must  be  used  as  directed. 

606.  Spiking. — The  track  shall  be  fully  spiked  to  the  gage  required.  Care  must  be 
taken  to  drive  spikes  vertically. 

Rail  Braces  and  Tie  Plates 

614.  Fixtures  must  be  used  in  track  as  directed.  Ties  should  be  properly  adzed  for 
even  bearing  of  the  tie  plates. 

Anti-Creepers  or  Rail  Anchors 

620.  Approved  anti-creeping  devices  should  be  applied  to  retard  the  creeping  or 
running  of  rail  as  directed. 

Shims  for  Surfacing  Track 

627.  The  use  of  shims  for  surfacing  track  should  be  avoided,  but  when  necessary, 
shims  of  the  size  and  type  directed  shall  be  applied  on  top  of  ties  to  the  height  required 
to  restore  proper  cross-level,  and  must  be  removed  from  the  track  as  soon  as  possible. 

Track  Centers 

640.  The  distance  between  track  centers  must  be  maintained  as  directed. 

Surface  and  Alinement 

645.  Alinement. — On  tangent  track,  the  two  rails  should  be  kept  to  cross-level. 

646.  Super-elevation. — The  super-elevation  on  curves  and  easements  must  be  main- 
tained in  accordance  with  requirements  and  prescribed  standards. 

Turnouts,  Switches,  Frogs  and  Guard  Rails 

660.  Installation. — Turnouts  must  be  installed  and  maintained  in  conformity  with 
prescribed  standards. 

663.  Switch  Locks. — Switch  locks  must  be  maintained  on  all  non-interlocked  main 
line  switches,  and  as  directed  at  other  turnouts.  Main  track  switches  must  be  locked  in 
main  line  position  when  not  in  use. 

Signs  and  Posts 

681.  Roadway  signs  must  be  installed  and  maintained  as  directed. 

Street  or  Highway  Grade  Crossings 

690.  Public  or  private  crossings  at  grade  must  be  constructed  and  maintained  in 
accordance  with  prescribed  plans  and  instructions. 

Fences,  Gates  and  Cattle  Guards 

699.  Fences,  cattle  guards  and  gates  shall  be  built  and  maintained  as  directed. 

Ill  BRIDGES  AND  BUILDINGS,  WATER  SERVICE  AND 
WORK  EQUIPMENT 

701.  Supervisors  of  bridges  and  buildings  are  in  charge,  on  their  respective  districts, 
of  the  maintenance  of  bridges  and  structures,  and  of  the  employees  engaged  thereon. 

702.  Supervisors  of  water  service  are  in  charge,  on  their  respective  districts,  of  all 
matters  pertaining  to  water  service,  and  of  the  employees  engaged  thereon. 

703.  When  necessary  to  take  out  of  service,  or  in  case  of  trouble,  facilities  affecting 
water  supply,  designated  officer,  including  dispatcher  if  train  operation  is  involved,  must 
be  promptly  advised  and  informed  of  the  amount  gf  the  water  on  hand.  Notice  must  be 
given  when  facihty  is  restored  to  service, 


Rules    and    Organization S3S 

704.  Pumpers  will  be  in  charge  of  local  water  supply  and  will  be  responsible  for 
the  general  condition  of  the  plant,  and  see  that  an  ample  supply  of  water  for  locomotive 
use  is  available  at  all  times. 

705.  In  case  of  trouble  affecting  the  water  supply,  pumpers  must  wire  the  dispatcher 
and  designated  officer,  stating  fully  the  difficulty,  what  is  needed  for  repairs  and  approxi- 
mately how  much  water  remains  on  hand. 

706.  In  freezing  weather  pumpers  must  see  that  all  parts  liable  to  freeze  are 
properly  protected. 

707.  Pumpers  shall  keep  a  daily  record  of  water  pumped. 

708.  Supervisors  of  work  equipment  will  be  in  charge,  on  their  respective  districts, 
of  such  work  equipment  as  may  be  under  the  general  supervision  of  the  division  engineer. 

709.  Supervisors  of  work  equipment  must  keep  a  daily  record  of  the  location  of 
each  machine,  together  with  such  records  of  performances  as  are  required. 

710.  Supervisors  of  work  equipment  will  instruct  all  operators  of  work  equipment 
in  the  operation  and  care  of  the  machines. 

IV  SIGNALS  AND  INTERLOCKING 

801.  Supervisors  must  make  frequent  inspections  of  signals  and  interlocking  plants 
and  have  necessary  repairs  made  as  promptly  as  conditions  require.  They  must  see  that 
all  failures  of  signals  and  interlocking  plants  are  properly  investigated  and  report  made 
on  proper  form. 

802.  Supervisors  must  keep  themselves  informed  in  regard  to  all  work  performed 
on  their  district  by  contractors,  or  others  who  do  not  come  under  their  charge,  to  see 
that  nothing  is  done  that  will  interfere  with  the  safe  operation  of  signals. 

803.  Supervisors  must  investigate  and  report  on  accidents  which  may  be  attributable 
to  defects  in,  or  result  in  damage  to  the  signal  apparatus. 

804.  Supervisors  must  not  make  or  permit  to  be  made  any  alterations  or  additions 
to  the  interlocking  or  signal  apparatus  without  proper  authority.  Such  authorized  changes 
or  additions  as  are  made  must  be  reported  to  the  proper  authority  immediately  upon 
their  completion,  so  that  the  other  departments  affected  may  have  such  information. 

805.  Signal  foremen  must  do  no  work  on  signals  and  interlocking  plants  that  will 
interfere  with  the  safe  passage  of  trains,  except  under  proper  protection. 

806.  When  any  part  of  an  interlocking  plant  is  to  be  repaired,  an  understanding 
must  be  reached  with  the  signalman  on  duty,  in  order  to  insure  safe  movement  of 
trains  and  engines  during  repairs.  The  signalman  on  duty  must  be  notified  when  the 
repairs  are  completed. 

807.  Signal  foremen  must  notify  the  supervisor  of  signals  in  advance  of  any  work 
requiring  the  removal  from  service  of  any  part  of  signal  or  interlocking  apparatus,  and 
such  apparatus  must  not  be  taken  out  of  service  until  proper  authority  is  obtained. 

808.  Signal  maintainers  are  responsible  for  the  inspection,  adjustment  and  proper 
maintenance  of  signal  and  other  apparatus  assigned  to  their  care. 

809.  Signal  maintainers  must  personally  instruct  their  subordinates  with  a  view  to 
safety,  efficiency  and  economy. 

810.  Signal  maintainers  must  systematize  their  work,  consulting  the  supervisor  of 
signals  as  to  the  most  efficient  system  to  be  followed. 

811.  Signal  maintainers  must  not  make  any  alterations  or  additions  to  the  inter- 
locking or  signal  apparatus  unless  authorized  by  the  supervisor  of  signals. 

812.  A  thorough  investigation  must  be  made  of  every  reported  failure  and  the 
trouble  must  not  be  reported  as  due  to  a  cause  which  is  only  suspected.  In  all  cases 
an  endeavor  must  be  made  to  definitely  determine  the  trouble  and  eliminate  the  cause. 


536 Rules   and    Organization 

Conduct  of  Work 

See  AAR  Signal  Section  Manual,  also  ICC  Order  dated  April  13,  1Q39,  covering 
rules,  standards,  and  instructions  for  installation,  inspection,  maintenance,  and  repair  of 
automatic  block  signal  systems,  interlocking,  centralized  traffic  control  systems,  auto- 
matic cab  signal  systems  continuously  controlled — without  automatic  train  stop  or  train 
control — dragging  equipment  and  slide  detectors  and  other  similar  protective  devices, 
other  similar  appliances,  methods,  and  systems. 

V  TELEPHONE  AND  TELEGRAPH 

901.  Line  gang  foremen  must  use  every  precaution  to  avoid  causing  wire  trouble 
while  doing  work,  and  keep  wire  chief  advised  at  all  times,  while  on  duty,  where  they 
can  be  located. 

902.  Linemen  must  maintain  pole  lines  and  wires  and  equipment  and  inside  wiring 
on  their  respective  territories.  They  must  clear  trouble  reported  to  them,  reporting  to  the 
designated  officer  the  details  of  work  they  are  not  able  to  take  care  of,  or  which  would 
interfere  with  their  regular  work. 

903.  Linemen  after  clearing  trouble  must  immediately  report  to  the  designated 
officer  the  cause  of  trouble  and  time  cleared. 

904.  Wire  chief,  or  other  designated  officer,  must  locate  all  trouble  in  wires  and 
equipment  used  by  the  Railroad  Company,  and  take  charge  of  and  issue  instructions  in 
regard  to  clearing  of  trouble. 

905.  Wire  chief  must  make  a  test  of  all  Railroad  wires  each  morning  to  determine 
whether  they  are  in  serviceable  condition,  and  make  reports  as  prescribed. 

906.  Instructions  from  the  wire  chief  govern  in  the  rerouting  of  circuit  facilities. 

Conduct  of  Work 

See  AAR  Telephone  and  Telegraph  Section  Manual. 

VI  ELECTRIFIED  TERRITORY 

1001.  Power  supervisors  are  responsible  for  the  general  operation  of  the  electric 
power  system,  and  in  all  cases  of  trouble  likely  to  affect  the  operation  of  the  electric 
power  system  must  promptly  report  same  to  the  designated  officer  and  take  such  further 
steps  as  may  be  necessary  to  insure  continuity  of  operation. 

1002.  Supervisors  of  transmission  must  frequently  inspect  transmission  system  and 
appliances,  keeping  a  complete  record  of  such  inspections  and  recommending  such  changes 
as  may  seem  desirable. 

1003.  Patrolmen  must  carefully  examine  all  facilities  under  their  care  and  make  sure 
that  everything  is  safe.  They  must  report  at  frequent  intervals,  by  telephone  or  tele- 
graph, advising  of  any  defects  noticed,  and  must  report  at  once  any  serious  defects  which 
they  cannot  correct  without  assistance. 

1004.  Wires  and  overhead  conductors,  third  rail  and  conductors  are  to  be  considered 
alive  at  all  times  unless  positive  knowledge  to  the  contrary  is  shown.  Employees  must 
not  place  dependence  for  their  safety  on  the  insulating  covering  of  wires. 

1005.  When  persons  other  than  qualified  employees  are  required  to  work  near  third 
rail  or  high  tension  overhead  wires  or  apparatus,  they  must  be  protected  by  a  qualified 
employee,  who  will  take  necessary  precautions  for  their  safety  before  starting  and  during 
the  progress  of  the  work. 


Rules   and    Organization 537 

1006.  Employees  noticing  dangling  wires  must  avoid  coming  in  contact  with  them. 
They  must  so  protect  the  wires  that  they  will  not  endanger  other  persons  and  must 
correct  the  condition  or  promptly  notify  the  proper  authority. 

1007.  Employees  (excepting  qualiiied  employees  authorized  to  do  so  in  the  discharge 
of  their  duties)  are  prohibited  from  going  on  top  of  box  cars,  locomotives,  tenders  or 
other  high  equipment  while  on  tracks  electrified  with  overhead  wires  or  while  move- 
ments are  being  made  to  such  tracks  from  sidings,  yards  or  other  tracks  which  are  not 
electrified. 

1008.  Umbrellas,  clothing  and  other  material  must  not  be  placed  where  they  may 
come  in  contact  with  disconnecting  switches  or  other  portions  of  electric  circuits. 

1009.  When  fire  occurs  near  high  voltage  overhead  wires  or  when  fire  apparatus  is 
tested  near  live  wires  the  power  should  preferably  be  shut  off  and  the  wires  grounded. 
When  this  is  not  possible  special  nozzles  with  grounding  jumpers  securely  attached  must 
be  used. 

1010.  In  case  of  an  electrical  fire,  water  must  not  be  used  to  extinguish  it.  Sand, 
pyrene  and  other  extinguishers  containing  carbon  of  tetrachloride  may  be  used  on  elec- 
trical fires  on  arcs  or  other  live  parts.  The  extinguishers  containing  carbon  of  tetachloride 
must  not  be  used  in  closed  places  due  to  danger  of  asphyxiation. 

1011.  No  high  tension  disconnecting  switch  must  be  operated  except  by  means  of 
the  wood  poles  or  other  approved  devices  provided  for  that  purpose. 

1012.  Hand  lines,  or  measuring  tapes  containing  metal  strands  or  steel  tapes  must 
not  be  used  where  they  may  come  in  contact  with  live  wires. 

1013.  When  necessary  to  work  on  transmission  lines,  either  aerial  or  underground, 
or  any  apparatus  in  connection  therewith,  the  employees  before  doing  so  must  notify 
the  proper  officer,  giving  him  full  information  as  to  what  work  is  necessary,  location 
and  length  of  time  required. 

1014.  If  the  section  or  apparatus  on  which  work  is  to  be  performed  may  be  de- 
energized,  the  power  director  will  arrange  for  opening  the  necessary  disconnecting 
switches  in  the  power  stations  and  sub-stations  affected,  or  on  the  line,  will  have  them 
properly  tagged  and  grounded  at  each  switch,  opened  for  the  protection  of  the  employees, 
and  will  then  notify  such  employee  that  power  has  been  shut  off  the  section  or  apparatus. 
Before  allowing  men  to  work  on  such  section  or  apparatus  or  before  doing  so  himself, 
the  said  employee  must  make  out  a  permit  on  the  prescribed  form  and  repeat  the  in- 
formation entered  theieon  to  the  power  director,  who  will  answer  "correct"  if  the  permit 
is  properly  made  out.  Said  employee  must  then  see  that  all  wires  or  apparatus  upon 
which  work  is  to  be  done  are  properly  grounded  at  each  side  and  near  where  the  work 
is  to  be  done,  first  making  test  according  to  prescribed  methods  to  ascertain  that 
apparatus  is  de-energized,  not  only  at  the  source  but  also  at  point  where  work  is  being 
done,  and  if  men  are  working  with  him  caution  them  by  calling  their  attention  to  any 
adjacent  high  tension  wires  or  fixtures. 

1015.  After  work  has  been  completed  the  employee  who  has  obtained  the  permit 
must  assure  himself  that  all  men  are  in  the  clear  and  that  the  grounds  have  been  removed. 
He  must  then  personally  notify  the  power  director  that  the  work  has  been  completed, 
that  all  men  are  in  the  clear  and  that  the  power  may  be  turned  on. 

1016.  When  working  on  high  voltage  trolley  system,  the  employee  must  see  after 
current  has  been  shut  off  that  grounds  are  placed  on  each  side  and  near  the  point  where 
work  is  to  be  done.  He  must  also  ascertain  from  the  power  director  that  the  line  has 
been  grounded  at  each  disconnecting  switch  opened  for  his  protection.  If  work  is  to  be 
done  near  a  section  break,  on  both  sides  of  which  the  power  has  been  shut  off  the  trolley 
wire,  he  must  see  that  grounds  are  placed  on  each  side  of  this  section  break. 


538  Rules    and    Organization 

1017.  Where  physical  and  electrical  conditions  will  permit  and  adequate  safeguards 
are  provided,  authorized  employee  may  perform  work  on  energized  overhead  trolley  wires. 

Third  Rail 

1018.  When  working  on  the  third  rail  system  the  employee  must  either  see  that  the 
current  is  first  shut  off  of  the  section  on  which  work  is  to  be  done  or  must  take  proper 
precautionary  measures  to  avoid  shock. 

1019.  Employees  working  on  the  track  must  be  instructed  previously  on  the  dangers 
of  the  third  rail  and  must  use  every  precaution  to  avoid  coming  in  contact  with  it  or 
allowing  any  track  tool  to  make  contact  with  the  third  rail. 

Track  Bonding 

1020.  Loose  connections  to  impedance  bonds  in  the  tracks  must  be  regarded  as  aHve 
and  prompt  report  made  to  the  train  dispatcher. 

1021.  Tracks  carrying  power  current  must  be  bonded  at  each  joint  to  insure  free 
flow  of  current,  the  joints  in  tracks  carrying  power  current  must  be  bonded,  and  the 
bonds  maintained  in  good  condition. 

1022.  When  one  or  more  rails  are  removed,  bonding  must  be  done  at  the  time  of 
renewal  or,  in  emergency,  a  jumper  placed  around  joints  until  joints  can  be  bonded. 

Conduct  of  Work 

See  Manuals  of  Electrical  Section — Engineering  Division  and  Electrical  Section — 
Mechanical  Division,  AAR. 


Report  of  Committee  1 — Roadway  and  Ballast 


A.  E.  BoTTS,  Chairman, 

F.  W.  Alexander 
E.  J.  Bayer 

E.  J.  Beugler 
Clifton  Brannon 
H.  F.  Brown 

G.  H.  Burnette 

F.  W.  Capp 
Paul  Chipman 
A.  P.  Crosley 

L.  J.  Drumeller 
R.  L.  Dyke 
Herbert  Ensz 
J.  A.  Given 
A.  T.  Goldbeck 
F.    L.  Guy 


Albert  Haertlein 

F.  W.  HiLLMAN 

A.  R.  Jones 
O.  N.  Lackey 

G.  E.  Ladd* 
H.  W.  Legro 

P.  J.  McCarthy 
Paul  McKay 
G.  W.  Miller 
W.  S.  Moore 
C.  P.  Nicholson 
J.  A.  Noble 
M.  C.  Patton 
G.  W.  Payne 

J.    M.    PODMORE 
T.   P.  POLSON 


A.  D.  Kennedy,  Vice- 

Chairman, 
W.   C.  Pruett 
C.  S.  Robinson 
L.  H.  Roden 
L.  S.  Rose 
E.  M.  Smith 
w.  c.  swartout 
Raymond  Swenk 
H.  E.  Tyrrell 
Stanton  Walker 
G.  B.  Wall,  Jr. 
C.  S.  Wicker 
P.  H.  Winchester 
A.  H.  Woerner 

Committee 


Died  December  23,  1940. 


To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Physical  properties  of  earth  materials: 

(a)  Their  effect  upon  roadbed  performance. 
No   report. 

(b)  Structural  bearing  power. 

Progress  report — submitted  as  information   page  541 

2.  Natural  waterways: 

(a)  Size  of  waterway  openings,  formulas. 

Final  report — with  recommendations  for  inclusion  in  the  Manual   ....  page  543 

(b)  Prevention  of  erosion. 
No  report. 

3.  Culverts: 

(a)  Vitrified  clay  pipe  culverts — specifications. 

Final  report — with  recommendations  for  inclusion  in  the  Manual   ....  page  546 

(b)  Pipe  line  crossings.  Specifications  for  non-inflammable  substances  under 
pressure. 

Progress  report — ^intended  for  inclusion  in  the  Manual  in  1942   page  555 

4.  Formation   of   the   roadway: 

(a)  Settlement;   shrinkage,   subsidence. 

Final  report — recommended  for  adoption  to  replace  corresponding  material  now 
in   the  Manual    page  559 

(b)  Placing  material  in  embankments.  Consider  preparation  of  receiving  surface; 
compaction  by  layers;  spreading  travel  of  equipment,  rolHng,  jetting,  moisture 
content,   density   requirements. 

Progress  report  of  special  compaction  of  embankments,  submitted  as  information 
with  recommendations  for  the  revision  of  Section  33,  "Formation  of  Layers"  and 
Section  34,  "RoHing"  of  the  Grading  Specifications  now  in  the  Manual  .  .   page  561 


k 


Bulletin  423,  February,  1941. 


539 


540 Roadway    and    Ballast 

5.  Roadway   drainage: 

(a)  Adherence  to  recommended  practice. 
No  report. 

(b)  Effect  of  locomotive  blow-offs  on  track  maintenance,  collaborating  with 
Committee  13 — Water  Service,  Fire  Protection  and  Sanitation. 

No  report. 

6.  Roadway  protection: 

(a)  Slope  protection,  including  protection  against  slides  and  rock  falls,  collaborat- 
ing with  Committee  II — Signal  Section,  AAR. 

No  report. 

(b)  Retaining  structures: 

(a)  Cribbing;  timber;  concrete. 

(b)  Walls;  dry  rubble;  masonry. 

(c)  Report  on  results  obtained  with  sub-ballast  slabs. 
No  report. 

7.  Tunnels: 

Lighting 
Final  report — with  recommendations  for  inclusion  in  the  Manual page  565 

8.  Fences: 

(a)  Corrosion-resisting  fence  wire,  collaborating  with  appropriate  subcommittees 
of  Committee  A-5  on  Corrosion  of  Iron  and  Steel,  ASTM. 

Progress  report — submitted  as  information  page  566 

(b)  Wood  fence  posts,  Specifications,  etc. 

Progress  report — submitted  as  information  with  the  expectation  of  offering  specifi- 
cations  for  adoption  in   1942    page  567 

(c)  Electrified  fences,  collaborating  with  Committee  3 — Overhead  Transmission 
Line  and  Catenary  Construction  of  the  Electrical  Section,  Engineering  Division, 
AAR. 

Progress  report — submitted  as  information   page  569 

9.  Signs: 

(a)  Design  of  signs. 

Progress  report — submitted  as  information   page  570 

(b)  Specifications  and  plans  for  telltales — overhead  and  side. 
No  report. 

10.  Ballast: 

(a)  Section  design. 

Final  report — with  recommendations  for  inclusion  in  the  Manual page  571 

(b)  Develop  relationship  of  ballast  materials  between  service  behavior  and  results 
obtained  from  Los  Angeles  testing  machine. 

No  report. 

(c)  Investigate  the  use  of  asphalt  in  ballast. 

Progress  report — submitted  as  information   page  571 

(d)  Adherence  to  stone  specifications,  particularly  size. 

Final  report — with  recommendations  for  inclusion  in  the  Manual page  572 

11.  Revision  of  the  Manual. 
No  report. 

The  Committee  on  Roadway  and  Ballast, 

A.  E,  BoTTS,  Chairman. 


Roadway    and    Ballast S41 

Report  on  Assignment  1  (b) 

Physical  Properties  of  Earth  Materials 
Structural  Bearing  Power 

H.  W.  Legro    (chairman,   subcommittee),   E.   J.   Beugler,   H.   F.   BrowJi,   Herbert   Ensz, 
F.  L.  Guy,  Albert  Haertlein,  G.  E.  Ladd,  Paul  McKay,  A.  H.  Woerner. 

106.  STRUCTURAL  FOUNDATION  SOILS 

The  purpose  of  a  foundation  is  to  support  dead  and  live  loads  upon  the  earth  in 
such  manner  that  the  soil  will  not  fail  or  undergo  unequal  deformation  which  would 
harm  the  structure  or  be  otherwise  objectionable. 

Certain  fundamental  principles  concerning  the  relation  of  the  footing  to  the  founda- 
tion must  be  observed;  for  example,  the  importance  of  the  coincidence  of  the  center  of 
pressure  and  the  center  of  mass  of  the  footing.  In  design,  the  distribution  of  dead  and 
live  loads  on  the  foundation  depends  greatly  on  the  type  of  structure  and  nature  of  the 
loads  and  requires  trained  judgment  of  the  engineer.  These  matters  must  be  taken  into 
account  in  the  application  of  soil  mechanics  to  foundation  problems. 

A.  SETTLEMENT 

In  respect  of  settlement,  soils  under  load  may  be  classified  under  two  basic  divi- 
sions: (a)  Cohesive  soils  which  include  clays  and  sandy  clays,  and  (b)  cohesionless  soils 
of  which  sand,  gravel  and  silt  are  the  principal  varieties.  The  behavior  of  these  two 
classes  of  soils  differs  greatly.  Clay,  for  example,  compresses  very  slowly  due  to  the 
slowness  with  which  the  contained  moisture  escapes.  When  a  load  is  applied  to  a  mass 
of  clay,  the  water  first  takes  practically  all  the  load.  Then,  as  the  water  gradually 
escapes  under  pressure,  the  soil  skeleton  composed  of  the  clay  particles  carries  more  of 
the  applied  load.  Continued  application  tends  to  break  down  the  internal  structure,  con- 
soUdation  takes  place  and  settlement  of  the  supported  load  results.  Plastic  or  lateral 
flow,  if  present,  will  also  contribute  to  settlement. 

With  sand,  the  action  is  quite  different.  Each  particle  transmits  its  share  of  the 
pressure  received  more  directly  to  the  adjacent  particles.  Consolidation  is  more  rapid 
and  of  a  smaller  magnitude,  and  unless  vibration  is  present,  a  density  will  be  reached 
beyond  which  addition  of  load  will  have  no  effect  until  the  ultimate  resistance  of  the  soil 
is  reached.  Frictional  resistance  to  lateral  flow  is  much  greater  in  granular  soils. 

The  approach  to  the  computation  of  settlement  in  cohesive  soil  is  not,  in  theory, 
different  from  the  computations  of  deformations  and  deflections  in  a  structure.  The  pro- 
cedure is,  first,  compute  the  stresses;  then,  by  means  of  the  relations  between  stress  and 
deformation,  compute  the  strains;  and  finally,  by  summation  of  the  strains,  obtain  the 
total  movement,  or  settlement,  at  the  surface. 

The  first  part,  the  stress  distribution  in  soil,  is  determined  by  equations  developed 
for  the  computation  of  stress  distribution  in  elastic,  isotropic  and  homogeneous  solids. 
As  soils,  however,  possess  these  properties  to  Uttle  degree,  these  computations  can  be 
approximations  only,  but  are  useful  if  suitable  allowances  are  made  for  the  effects  of 
variations  in  soils. 

The  information  required  for  the  second  part,  that  is,  the  relation  between  stress 
and  deformation  in  soil,  may  be  obtained  from  laboratory  tests  of  an  undisturbed 
sample  of  the  soil.  A  comparatively  simple  test  serves  to  determine  the  physical  prop- 


542 Roadway    and    Ballast 

erties  of  the  material  for  this  condition.  From  the  test,  a  pressure-void  ratio  curve  is 
obtained  by  measuring  change  in  thickness  due  to  increments  of  pressure  at  definite 
intervals  of  time  until  equilibrium  is  reached.  Thus  a  relation  between  load,  time  and 
ultimate  deformation  may  be  obtained. 

Deformation  due  to  lateral  flow,  that  is,  failure  in  shear,  generally  is  to  be  taken 
into  account  in  determining  ultimate  bearing  capacity.  In  building  construction,  it  seems 
quite  unHkely  that  ultimate  bearing  capacity  will  be  reached  with  anything  like  present 
practice  as  progressive  settlement  under  such  conditions  would  be  excessive.  Bridge 
piers,  earth  embankments,  dams,  dikes,  cofferdams,  retaining  walls  and  other  structures 
producing  a  highly  concentrated  load  on  soil  are  more  likely  to  cause  failure  in  shear, 
or,  otherwise  expressed,  exceed  the  ultimate  bearing  capacity. 

An  additional  item  to  be  considered  in  settlement  of  structures  is  the  manner  in 
which  the  load  is  applied.  The  ratio  of  the  depth  of  a  foundation  to  its  width  or 
diameter  has  a  marked  effect  on  its  settlement  under  a  given  unit  load.  In  cohesionless 
soils,  the  settlement  of  a  foundation  under  a  given  unit  load  is  practically  independent 
of  its  width  for  large  areas  and  directly  proportional  to  the  width  for  smaller  areas; 
while  in  soils  having  high  cohesion  and  low  internal  friction,  the  settlement  under  a 
given  unit  load  increases  directly  with  the  diameter  of  the  loaded  area. 

While  it  is  important  to  design  for  the  distribution  of  loads  in  soil  with  respec* 
to  its  moisture  content  at  the  time  of  construction,  it  is  also  important  to  anticipate 
future  changes  in  moisture  content.  These  may  occur  either  by  the  raising  or  the 
lowering  of  the  water  table. 

If  the  moisture  content  of  soil  in  which  wood  piles  have  been  driven  is  materially 
decreased,  the  preservative  quality  due  to  continuous  submersion  is  lost  and  piling  fails 
from  decay.  When  the  ground  water  level  is  lowered  in  cohesive  soils,  the  soil  structure 
undergoes  change  and  structures  with  foundations  designed  for  stability  in  the  moisture- 
bearing  soil  are  likely  to  settle  largely  because  of  shrinkage  of  the  soil  mass.  Granular 
soil,  if  confined,  may  have  considerable  supporting  power  when  merely  saturated,  but 
that  supporting  power  disappears  if  hydrostatic  head  is  introduced.  So-called  quicksand 
illustrates  the  effect  of  this  condition. 

B.  BEARING  CAPACITY 

An  assumption  very  commonly  made  is  that  for  any  given  kind  of  soil  there  exists 
a  definite  safe  load  intensity.  Safe  bearing  values  are  not  based  alone  upon  a  knowledge 
of  the  properties  and  behavior  of  soils,  but  also  upon  the  experience  gained  from  observa- 
tions made  of  existing  foundations  regarding  which  many  pertinent  facts  are  known. 

Field  loading  tests  and  laboratory  tests  have  a  definite  place  in  soil  mechanics  but  in 
the  absence  of  other  information,  their  results  may  be  misleading.  Field  loading  tests  are 
usually  conducted  with  small-scale  areas  relative  to  the  size  of  the  foundation  for  the 
structure.  As  above  mentioned,  bearing  values  for  large  and  small  areas  are  not 
comparable. 

Laboratory  tests  are  valuable  for  measuring  the  physical  properties  of  soil,  but  it  is 
necessary  to  consider  that  the  soil  sample  under  test  has  undergone  some  change  during 
the  process  of  sampling  that  to  some  degree  makes  it  different  from  the  soil  left  undis- 
turbed in  the  ground.  It  should  be  remembered  also,  that  natural  soil  is  not  homogeneous, 
and  laboratory  measurements  reveal  the  properties  of  only  the  soil  at  the  few  spots 
where  the  samples  were  taken. 

Safe  bearing  loads  for  various  kinds  of  soil  as  shown  even  in  modern  building 
codes  should  be  used  for  important  structures  only  by  an  experienced  engineer  who  can 


Roadwav    and    Ballast  543 


evaluate  the  effect  of   the  many   variables   of  his  particular   problem   and  modify   as 
necessary  the  application  of  tabular  bearing  values  to  his  design. 

Piling  Foundations 

The  bearing  capacity  of  piles  depends  on  two  different  factors;  first,  the  frictional 
resistance  acting  along  the  sides  of  the  pile,  and  second,  the  point  resistance  or  resistance 
of  the  soil  against  compression  and  displacement  at  the  foot  of  the  pile. 

If  the  structure  of  clay  is  broken  down  during  construction,  by  pile-driving  for 
instance,  the  effect  is  to  increase  the  compressibility  of  the  foundation  area.  A  large 
portion  of  the  settlement  of  a  foundation  may  be  due  to  consolidation  of  the  remolded 
soil  under  its  own  weight  rather  than  to  the  load  distributed  by  the  piles  into  the  soil. 

Usual  pile-driving  formulas  are  based  on  the  energy  of  blow  and  penetration  of  the 
pile,  or  a  dynamic  condition.  What  is  desired  is  satisfactory  static  bearing  capacity. 
Thus,  the  driving  formula  is  of  value  only  in  such  cases  as  the  dynamic  resistance,  or 
rapid  penetration,  is  some  measure  of  the  static  bearing  capacity,  or  slow  penetration.  In 
sands,  gravels  and  other  relatively  permeable,  cohesionless  soils,  driving  penetration  and 
static-load  penetration  are  about  the  same.  The  dynamic  formula  in  this  case  may  give  a 
close  approximation  of  the  static  resistance  of  an  individual  pile.  In  clays,  silts  and  other 
relatively  impermeable,  cohesive  soils,  there  is  no  known  relation  between  the  dynamic 
resistance  and  the  static  bearing  capacity  of  piles,  so  that  for  such  soils,  a  pile-driving 
formula  has  not  been  developed  that  contains  all  factors  necessary  to  produce  satisfactory 
results. 

Comparing  the  penetration  per  blow  immediately  before  with  that  after  a  period 
of  rest  of  at  least  24  hours  will  determine  whether  the  material  of  the  foundation  belongs 
to  the  first  or  to  the  second  class.  If  these  two  penetrations  are  alike,  it  is  quite  certain 
that  the  material  belongs  in  the  first  class,  and  that  a  pile-driving  formula  can  be 
expected  to  furnish  fairly  reliable  results. 

In  all  cases  where  the  piles  do  not  act  strictly  as  columns,  the  summation  of  the 
bearing  power  of  the  individual  piles  in  a  foundation  may  not  represent  the  bearing 
power  of  the  foundation  as  a  whole.  The  effect  either  of  consolidating  the  soil  by  pile- 
driving  or  of  increasing  the  compressibility  through  re-molding  must  be  considered  in  the 
light  of  experience. 


This  report  is  presented  as  information. 


Report  on  Assignment  2  (a) 

Size  of  Waterway  Openings,  Formulas 

L.  S.  Rose  (chairman,  subcommittee),  E.  J.  Bayer,  G.  W.  Miller,  C.  P.  Nicholson,  J.  A. 
Noble,  M.  C.  Patton,  G.  W.  Payne,  T.  P.  Poison. 

203.  SIZE  OF  WATERWAY  OPENINGS 

A.  FORMULAS 

After  all  available  data  have  been  collected  for  the  area  under  consideration  the 
next  step  in  determining  the  proper  size  of  a  waterway  opening  is  to  reduce  these  data 
to  the  quantity  of  water  in  cubic  feet  per  second  which  will  reach  the  opening.  Where 
no  record  of  actual  runoff  measurement  is  available  this  is  done  with  the  aid  of  a  runoff 
formula  or  by  tables  or  curves  developed  from  formulas. 


544 Roadway    and    Ballast 

Many  years  of  research  have  failed  to  develop  a  single  formula  which  is  applicable, 
with  any  degree  of  accuracy,  to  all  conditions.  A  bewildering  number  of  factors,  con- 
stants and  variants  have  been  more  or  less  ingeniously  combined  to  make  various  form- 
ulas fit  the  needs  of  given  conditions.  Nearly  all  such  formulas  contain  some  coefficient 
C  which  groups  many  of  these  variables  and  the  user  is  left  with  the  problem  of  an 
accurate  evaluation  of  these  factors.  Text  books,  scientific  papers  and  published  discus- 
sions all  indicate  that  every  runoff  formula  in  more  or  less  common  use  today  has  been 
qualified  either  by  the  author,  who  has  pointed  out  its  limitations,  or  by  other  authorities 
who  have  been  free  in  their  criticism.  It  is  therefore  apparent  that  the  selection  of  a 
formula  and  its  factors  must  be  made  in  each  case  with  excellent  judgment  backed  by 
experience  and  careful  observation. 

Former  reports  of  this  committee  contain  practically  all  the  formulas  in  use  today, 
with  descriptive  matter  setting  forth  their  limitations  and  usage.  These  will  not  be 
repeated,  but  an  understanding  of  the  basic  principles  from  which  most  of  these  formulas 
evolve  may  be  of  value. 

A  study  of  runoff  data  in  cubic  feet  per  second  platted  against  the  square  miles  of 
drainage  areas,  as  analyzed  by  Jarvis,*  indicates  the  relation, 


M  n 


in  which  C  and  n  are  constants,  M  representing  the  square  miles  of  drainage  area  and  q 
the  runoff  in  cubic  feet  per  second  per  square  mile  (See  Fig.  1).  Some  authorities  do  not 
agree  with  this  conclusion,  the  principal  reason  being  that  it  is  based  upon  only  one  factor 
of  runoff,  i.e.,  that  of  area.  It  is  believed,  however,  that  with  the  large  number  of  ob- 
servations made  and  for  the  purpose  intended  it  does  indicate  the  trend. 

Based  upon  the  above  equation,  the  total  runoff  from  the  basin  then  would  be 

qM= -^^or   Q  =  CM^ 

M~ 

This  fundamental  form  is  followed,  with  slight  variations,  by  many  of  the  widely  used 
formulas  in  which  n  generally  takes  a  value  between  1.5  and  6,  and  results  in  expressions 

3  6  4-1 

such   as    VM   and   through   to    VM^   For   example,   where   n    =   4,   Q   =i  CM   4 

3  4 

or  Q=  CM*  ,or  0  rr:  C  V  M3. 

In  an  attempt  to  reduce  the  many  formulas  to  a  common  ground  for  comparison 
Jarvis  has  selected  the  Myers  type  for  modification  and  extension.  In  Myers  formula 
a  =  C^ A  in  which  a  equals  the  necessary  area  of  opening,  if  velocity  of  flow  is  assumed 
at  10  feet  per  second,  A  equals  the  area  of  the  drainage  basin  in  acres,  and  C  is  a  co- 
efficient varying   from    1   to   4.    Changing   the   area   from   acres   to   square   miles;   a  = 

C  X  25.3    /'a  ,— - 

|/ 7T^>  or  fl^=CX25.3    vM.  Then  assuming  C  ^  40  we  have  approximately 

a  =  1,000  VM  and  substituting  Q,  quantity,  for  a,  area  of  opening,  Q  =  aV  or,  with  a 
10-ft.  velocity,  Q  =  10,000  VM.  The  resulting  graph  for  Q,  correlated  with  recorded 
flood  flows  (Fig.  1)  is  found  to  lie  above  all  but  two  platted  points  representing  runoff 


>  Paper  No.    1589— Flood   Flow  Characteristics— ASCE  Transactions  Vol.   89,   1926. 


9000 
8000 
7000 
6000 
6000 

4000 
8000 


2000 


1000 

900 

800 

700 

0,  600 

a  600 

«  400 

§  300 

c 

CQ 

«  200 

04 


o  90 

%  80 

03  70 

.S  60 

V  60 


40 


-3 

o 

20 

o 

s 

1 

s 

10 

1 

9 
8 

1^ 

7 

«M 

6 

o 

1 

6 

V 

4 

JH 

8 

1 

0.9 
0.8 
0.7 
0.6 
0.6 
0.4 

0.8 


0.2 


PLATE  IX 

TRAN8.,  AM.  80C.  CIV.  ENGR8. 

VOL.  89,  PAPER  No.  15*9. 

JARVIS  ON 

FLOOD  FLOW  CHARACTERISTICS. 


4567891  2  3      4BC7S91 

Hundreds  Thousands 

Areas  of  Drainage  Basins  in  Square  Milea 


4     6    6  789  1 
Haadr«d  Xbousaada 


1000 
9 
8 

7 
6 
5 


2  — 


a:  100 
_       9 


3  — 


RELATION   OF  VARIOUS  RUNOFF   FORMULAS 
TO  DRAINAGE    AREAS 

TOTAL  RUNOrF  IN  CUBIC  FEET   PER  SECOND 
a    =CROSS    SECTION  OF  WATERWAY  IN    SQUARE  FEET 
A  =ORAINAGE  AREA  IN  ACRES 
M  >=DRAINAGE  AREA  IN  SQUARE  MILES 
T  =TIME  INTERVAL  IN  YEARS 
C  =A  NUMERICAL  COEFFICIENT 
V  =VELOCITY   IN  FEET    PER  SECOND 


2         3     4     5  6  789  I 

TENTHS 


3      4     5  6  7  891 


3      4567891  2         3      456789  I 

TENS  HUNDREDS 

DRAINAGE    AREA   IN    SQUARE   MILES    (M) 

FIG.  2 


2         3      4     567891 
THOUSANDS 


2         3      4     5  6  789  I 
TEN  THOUSANDS 


2        3     4    567891 
HUNDRED    THOUSANDS 


REPRODUCED  FROM  TRANS.  AM  SOC  CIV  ENGRS. 
VOL  89- PAPER  NO.I589  BY  CS-JARVIS  ON  FLOOD 
FLOW  CHARACTERISTICS 


Roadway    and    Ballast 545 

rates  and  to  conform  closely  with  the  enveloping  curve,  thus  justifying  the  assumption 
of  C  =  40  for  maximum.  This  indicates  that  Myers  maximum  of  C  =  4  would  corre- 
spond to  10  percent  of  the  maximum  enveloping  curve  in  Fig.  1. 

Similarly  for  lower  limits  the  path  of  the  point,  Q  =  100  VM,  conforms  well  with  the 
general  slope  and  lies  above  only  5  percent  of  the  more  than  1,000  platted  flood  runoff 
rates. 

The  wide  range  between  the  maximum  and  minimum  curves  illustrates  clearly  the 
need  of  excellent  judgment  and  careful  consideration  of  all  available  data  before  any 
important  waterway  structure  is  designed.  As  further  evidence,  recent  studies  made  by 
U.  S.  Army  engineers,  using  the  formula  Q  =  C^M,  indicates  the  danger  of  transfer- 
ring a  coefficient,  which  has  been  determined  by  actual  measurements,  from  one  water- 
shed to  another  nearby  or  even  to  different  areas  in  the  same  watershed.  For  example: 
the  curve  for  the  upper  Susquehanna  basin  follows  the  formula  Q  =  2,840  VM  for  areas 
from  10  to  300  square  miles,  but  for  the  remaining  portion  of  the  curve  the  coefficient 
gradually  increases  until  at  10,000  square  miles  it  reaches  a  value  of  4,000.  Certain  sec- 
tions of  the  area  have  coefficients  varying  from  1,700  to  2,500  and  in  the  Finger  Lakes 
region  they  run  as  high  as  6,000. 

Only  the  basic  type  of  formula  as  correlated  to  actual  measured  flood  discharges 
has  been  considered.  For  a  graphic  illustration  of  the  relationship  between  this  formula 
and  other  best  known  expressions  of  runoff  see  Fig.  2. 

A  very  important  factor  in  determining  the  quantity  of  runoff  for  which  a  structure 
is  to  be  designed  is  that  of  the  time  element  or  periodic  expectancy  of  flood  flows.  Un- 
fortunately stream  flow  records  cover  only  a  comparatively  recent  period  and  do  not 
yet  permit  the  establishing  of  a  dependable  flood  cycle  if  such  a  cycle  actually  exists. 
For  convenience,  floods  of  different  magnitudes  are  classified  as  1,  10,  100  or  1,000-year 
floods.  It  should  be  kept  in  mind,  however,  that  the  100-year  flood  may  occur  next 
year,  followed  a  year  later  possibly  by  the  1,000-year  flood.  Several  formulas  have  been 
advanced  f  r  determining  the  relationship  of  major  floods  of  T  years  to  those  of  a  one 
year  maximum.  Jarvis  in  his  paper,  referred  to  above,  treats  of  this  subject.'  In  spite  of 
the  fact  that  no  assurance  can  be  had  as  to  when  so-called  great  floods  will  occur  a  flood 
of  some  fixed  maximum  in  most  cases  must  be  selected  for  design.  This  selection  should 
be  based  upon  the  following. 

(a)  First  cost  of  structure 

(b)  Importance  of  structure 

(c)  Available  detour  lines 

(d)  Probable  duration  of  flood  flows 

(e)  Time  required  for  replacement  and  cost 

(f)  Probable  damage  from  back  water 

(g)  Available  overflow  channels  and  areas. 

SIZE  OF  OPENING 

After  the  quantity  of  runoff  has  been  determined  for  which  the  structure  is  to  be 

designed  the  wetted  area  of  the  opening  then  becomes  a  =  — ,  in  which  Q  =  the  total 

yield  of  the  watershed  in  cubic  feet  per  second  and  V  ^=  velocity  of  flow  in  feet  per 
second.  In  most  runoff  formulas  which  solve  direct  for  a,  V  is  assumed  at  ten  feet  per 


'  See  also,  Flood  Flows  by  Allen  Hazen — Relief  from  Floods  by  Alvord  and  Burdick. 


546 Roadway    and    Ballast 

second.  This  figure  however  should  not  be  taken  arbitrarily.  Consideration  should  be 
given  to  the  average  rate  of  flow  above  and  below  the  opening,  the  nature  of  the  channel 
material  and  the  bridge  foundation.  In  many  cases,  to  avoid  erosion  the  velocity  should 
not  exceed  two  or  three  feet  per  second.  It  should  also  be  kept  in  mind  that  if  the 
hydrauhc  gradient  of  the  stream  is  to  be  maintained  no  portion  of  the  computed  area 
required  should  be  above  the  elevation  of  the  flood  crest.  However,  additional  headroom 
should  be  provided  to  permit  the  free  passage  of  floating  debris.  In  general,  this  results 
in  low  structures  of  long  spans  for  wide  streams  and  high  structures  of  shorter  spans 
for  narrow  gorges.  For  pipe  culverts,  the  elevation  of  the  water  surface  may  necessitate 
a  battery  of  smaller  pipes  instead  of  a  large  one  of  equivalent  area. 

CONCLUSIONS 

Runoff  formulas  for  determining  the  required  sizes  of  waterway  openings,  although 
not  recommended,  may  be  used  where  structures  of  low  cost  and  minor  importance  are 
involved,  and  when  the  formula  is  applied  with  an  appreciation  of  its  limitations,  its 
use  is  intended  only  as  a  guide,  and  the  results  are  to  be  modified  as  other  known  data 
and  experience  seem  to  demand. 


This  report  was  presented  to  the  1940  convention  as  information  with  the  statement 
that  it  would  be  offered  this  year  for  adoption  and  inclusion  in  the  Manual,  and  it  i.= 
therefore  so  recommended. 


Report  on  Assignment  3  (a) 

Vitrified  Clay  Pipe  Culverts — Specifications 

W.  C.  Swartout  (chairman,  subcommittee),  F.  W.  Capp,  J.  A.  Given,  Paul  McKay,  G.  W. 
Payne,  L.  H.  Roden,  E.  M.  Smith. 

Last  year  your  committee  presented  for  your  consideration  as  information,  a 
specification  for  Vitrified  Clay  Culvert  Pipe  adapted  from  ASTM  Specification  CI 3-3 5. 
No  criticisms  of  the  specification  have  been  received  from  any  source  and  it  has  received 
the  approval  of  ASTM  Committee  C-4  on  Clay  Pipe  to  which  it  had  been  submitted. 

The  specification  as  presented  below,  with  a  few  corrections  of  the  form  in  which  it 
was  published  last  year,  is  therefore  submitted  with  the  recommendation  that  it  be 
adopted  and  published  in  the  Manual. 

Ill  CULVERTS 

302.  VITRIFIED  CLAY  PIPE  CULVERTS 

A.  SPECIFICATIONS  FOR  VITRIFIED  CLAY  CULVERT  PIPE 

Extra  Strong  or  Triple  Strength 
Adapted  from  ASTM  Specification  C  13-35 

GENERAL 
I.  Scope 

These  specifications  cover  vitrified  clay  pipe  intended  to  be  used  for  the  construction 
of  culverts  and  other  projects  where  conditions  require  that  extra-strength  pipe  be  used. 


Roadway    and    Ballast 547 

2.  Materials 

(a)  Clay  pipe  shall  be  manufactured  from  surface  clay,  fire  clay,  or  shale  or  a 
combination  of  these  materials. 

(b)  These  materials  or  any  combination  thereof,  when  molded  into  pipe  and  sub- 
jected to  suitable  temperatures,  shall  produce  a  product  that  wDl  be  strong,  durable, 
serviceable,  free  from  objectionable  defects  and  shall  conform  to  these  specifications. 

RESISTANCE  TO  ACTION  OF  ACIDS 

3.  Resistance  to  Action  of  Acids 

The  following  tests  as  to  the  resistance  of  clay  culvert  pipe  to  the  action  of  acids 
may  be  prescribed. 

When  testing  with  either  hydrochloric,  nitric,  sulfuric  or  acetic  acid,  as  specified  by 
the  purchaser,  the  acid  having  a  normality  of  one  (1.0  N)\  the  percentage  of  acid-soluble 
matter  shall  not  exceed  0.25  percent,  calculated  as  sulfates.  The  purpose  of  this  test 
is  to  determine  the  resistance  of  pipe  to  the  action  of  acids  and  its  use  is  optional. 

4.  Test  specimens 

Where  possible  the  specimens  intended  for  these  tests  shall  be  selected  from  pipes 
which  have  been  previously  subjected  to  the  crushing  strength  test.  Specimens  shall  be 
sound  with  all  edges  freshly  broken,  free  from  cracks  or  shattered  edges,  about  2  inches 
square,  not  weighing  more  than  200  g.  and  shall  be  thoroughly  cleaned  with  a  wire  brush. 

5.  Number  of  Tests 

A  test  shall  be  made  on  at  least  one  specimen  cut  from  each  size  of  pipe.  The 
results  shall  be  reported  separately  for  each  individual  specimen. 

6.  Weighing  Apparatus 

The  weighing  shall  be  made  on  a  balance  accurate  to  0.01   g.  when  loaded  with 

200  g. 

7.  Test  Procedure 

(a)  Specimens  to  be  tested  shall  be  dried  to  constant  weight  at  a  temperature  of  from 
210  to  230  degrees  F. 

(b)  The  specimens  upon  reaching  constant  weight  shall  be  completely  immersed  in 
the  test  solution  at  a  temperature  of  from  70  to  90  degrees  F.  for  a  period  of  48  hours, 
then  removed  from  the  solution,  carefully  and  thoroughly  washed  with  hot  water,  allowing 
the  washings  to  run  into  the  solution  in  which  the  specimen  was  immersed.  This  solution 
shall  be  filtered  and  to  the  filtrate  shall  be  added  5  ml.  of  concentrated  sulfuric  acid. 
This  solution  shall  then  be  evaporated  (avoiding  loss  of  spattering)  to  about  5  ml.; 
transferred  to  a  porcelain  crucible  (previously  ignited  to  constant  weight)  and  heated 
cautiously  to  dryness.  It  shall  then  be  ignited  to  constant  weight. 

8.  Calculation 

The  weight  of  the  residue  in  the  porcelain  crucible  divided  by  the  weight  of  the  dry 

specimen  before  immersion,  multiplied  by  100,  is  the  percentage  of  acid-soluble  matter 

calculated  as  sulfates. 

.,      ,  , ,         ,.  Wt.  of  residue  in  grams  X  100 

Percentage  acid-soluble  matter  =-— — r^ H^ 

Wt.  of  dry  specimen  in  grams. 


^  The  following  percentages  are  required  to  make  an  acid  of  a  normality  of  one:  sulfuric  acid,  4.90 
percent;   hydrochloric  acid,  3.65  percent;  nitric  acid,  6.30  percent;  acetic  acid,  6.00  percent. 


548 


Roadway    and    Ballast 


PHYSICAL  PROPERTIES  AND  TESTS 

9.  Physical  Requirements 

The  crushing  strength  and  absorption  of  clay  culvert  pipe  shall  conform  to  the  re- 
quirements given  in  Table  1.  The  individual  results  of  the  various  tests  for  each  size  of 
pipe  and  for  each  shipment  shall  be  tabulated  separately  so  as  to  show  the  percentage 
which  fails  to  conform  to  the  requirements  of  each  test. 

10.  Test  Specimens 

The  specimens  for  purpose  of  tests  shall  be  sound  full-size  pipe  and  shall  be  selected 
by  the  purchaser  or  his  representative  at  the  point  or  points  designated  by  him  when 
placing  the  order. 

11.  Number  of  Tests 

(a)  The  manufacturer  or  seller  shall  furnish  specimens  for  test,  without  charge,  up  to 
0.5  percent  of  the  number  of  pipes  in  each  size  of  pipe  furnished,  except  that  in  no  case 
shall  less  than  two  specimens  be  furnished. 

(b)  In  any  case  where  more  than  five  specimens  are  required  for  testing,  not  more 
than  five  specimens  shall  be  crushed  to  the  point  of  failure.  All  specimens  in  excess  of 
five  which  show  a  testing  strength  of  10  percent  above  the  requirements  of  this  specifica- 
tion shall  be  removed  from  the  testing  apparatus  without  being  broken. 

12.  Measurement  and  Observation  of  Specimens 

The  specimens  taken  from  pipe  tested  to  destruction,  shall  be  first  freed  from  all 
visible  moisture.  When  dry,  each  specimen  shall  be  measured  and  inspected.  The  results 
of  these  observations  shall  be  recorded. 

13.  Defective  Specimens 

Specimens  which  are  observed  to  have  fire  cracks  or  other  defects  in  form  or 
dimensions  in  excess  of  the  limits  permitted  in  these  specifications,  shall  be  discarded 
and  replaced  with  additional  specimens  from  the  shipment. 


Table  1 

Physical  Test  Requirements  of  Clay  Culvert  Pipe 

Average  crushing  strength 
minimum,  Pounds  per  Linear 

Foot 
Three-Edge  Sand- 
Bearing  Bearing 
Internal  Diameter,  Inches                                     Method  Method^ 

12    2,000  2,860 

15    2,500  3,570 

18    3,000  4,290 

21    3,500  5,000 

24    4,000  5,710 

27    4,500  6,430 

30    5,000  7,140 

33    5,500  7,860 

36    6,000  8,570 

'  See  Section  16. 
'  See  Section  17. 


Average 

Absorption 

Maximum 

Percent 

8 

8 


Roadway    and    Ballast 


549 


CRUSHING  STRENGTH 

14.  Crushing  Strength  Tests 

Pipe  shall  be  tested  for  crushing  strength  by  either  the  three-edge-bearing  method 
or  the  sand-bearing  method.  Either  of  the  two  specified  bearing  methods  shall  be  used  on 
retests  as  provided  for  in  Section  24  (a)  and  (b). 

15.  Application  of  Load 

(a)  Any  prime  mover  or  hand  power  which  will  apply  the  load  at  a  uniform  rate 
of  about  2,000  pounds  per  minute  or  in  increments  of  not  more  than  100  pounds  at  the 
same  rate,  may  be  used  in  making  the  test. 

(b)  The  center  of  the  load  shall  be  applied  to  the  top  bearing  block  at  a  point 
distant  from  the  spigot  end  of  the  pipe  equal  to  one-half  of  the  over-all  length  of  the 
pipe.  The  test  load  shall  be  applied  to  the  upper  bearing  block  in  such  a  way  as  to  leave 
the  bearing  free  to  move  in  a  vertical  plane  passing  midway  between  the  lower  bearings. 
In  testing  pipe  that  is  "out  of  straight,"  the  lines  of  the  bearings  chosen  shall  be  free 
from  those  which  appear  to  give  most  favorable  conditions  for  fair  test. 

(c)  The  pipe  shall  not  be  allowed  to  stand  under  load  longer  than  is  required  to 
apply  the  load  and  to  observe  and  record  it. 

(d)  The  testing  machine  shall  be  substantial  and  rigid  throughout,  so  that  the  dis- 
tribution of  the  load  will  not  be  affected  appreciably  by  the  deformation  or  yielding  of 
any  part.  The  bearings  shall  be  sufficiently  rigid  to  transmit  and  receive  uniform  loads 
throughout  their  lengths  without  deflection,  and  shall  be  so  attached  to  the  machine  as  to 
transmit  and  receive  the  maximum  loads  produced  by  the  tests  without  lost  motion, 
vibration,  or  sudden  shock. 


Socket 
(beyond  bearing) 

^^  Barrel  of  Pipe 


^  _  _  Space  /"per  foot 
of  Diameter  but 
Not  Less  than  I" 


Plaster  of- 
Paris  fillet 


'^yy.   K At  Least  6"x6" 

Fig.  1. — Three-Edge  Bearings. 


(e)  The  bearings  and  the  specimen  shall  be  accurately  centered  so  as  to  secure  a 
symmetrical  distribution  of  the  loading  on  each  side  of  the  center  of  the  pipe  in  every 
direction. 

(f)  The  load  shall  be  applied  until  the  pipe  yields  by  cracks  passing  through  the  shell. 

(g)  The  crushing  strength  shall  be  calculated  by  dividing  the  total  load  required 
to  break  each  pipe  by  the  net  inside  length  of  the  barrel  of  the  pipe,  measuring  from 
the  bottom  of  the  socket  to  the  end  of  the  spigot. 


550 Roadway    and    Ballast 

16.  Three-Edge-Bearing  Method 

When  the  three-edge-bearing  method  (See  Fig.  1)  is  used,  the  ends  of  each  specimen 
of  pipe  shall  be  accurately  marked  in  halves  of  the  circumference  prior  to  the  test. 
The  two  lower  bearings  shall  consist  of  two  wooden  strips  with  vertical  sides  having 
their  interior  top  corners  rounded  to  a  radius  of  approximately  Yz  inch.  The  strips  shall 
be  straight  and  securely  fastened  to  a  rigid  block  at  least  6  by  6  inch  in  cross-section. 
The  interior  vertical  sides  of  the  strips  shall  be  parallel  and  a  distance  apart  of  1  inch 
per  foot  of  pipe  diameter  but  in  no  case  less  than  1  inch.  Before  the  pipe  is  placed,  a 
fillet  of  plaster  of  Paris  or  other  equalizing  material,  such  as  sand  and  sulfur,  thick 
enough  to  compensate  for  the  inequalities  of  the  pipe  barrel  shall  be  cast  on  and  between 
the  two  lower  bearings.  The  pipe  shall  be  placed  on  the  fillet  while  the  plaster  of  Paris 
is  still  somewhat  plastic.  The  use  of  the  plaster  of  Paris  fillet  may  be  dispensed  with 
when  mutually  agreeable  to  the  manufacturer  and  the  purchaser.  The  upper  bearing 
shall  be  a  rigid  wooden  block  at  least  6  by  6  inch  in  cross-section,  straight  and  true 
from  end  to  end.  A  fillet  of  plaster  of  Paris  thick  enough  to  compensate  for  the  inequali- 
ties of  the  pipe  barrel  shall  be  cast  along  the  length  of  the  crown.  The  upper  bearing 
shall  be  brought  in  contact  while  the  plaster  of  Paris  is  still  somewhat  plastic.  The  upper 
and  lower  bearings  shall  extend  the  full  length  of  the  pipe  exclusive  of  socket. 

17.  Sand-Bearing  Method 

When  the  sand-bearing  method  (see  Fig.  2)  is  used  the  ends  of  each  specimen  of 
pipe  shall  be  accurately  marked  in  quarters  of  the  circumference  prior  to  the  test. 
Specimens  shall  be  carefully  bedded,  above  and  below,  in  sand,  for  one-fourth  the 
circumference  of  the  pipe  measured  on  the  middle  line  of  the  barrel.  The  depth  of  bedding 
above  and  below  the  pipe  at  the  thinnest  points  shall  be  one-half  the  radius  of  the 
middle  line  of  the  barrel. 

The  sand  used  shall  be  clean  and  moist,  and  shall  be  such  as  will  pass  a  4760-micron 
(No.  4)  sieve.^  The  sand  in  the  lower  bearing  shall  be  loose  when  the  pipe  is  placed. 

The  top  bearing  frame  shall  not  be  allowed  to  come  in  contact  with  the  pipe  nor 
with  the  top  bearing  plate.  The  upper  surface  of  the  sand  in  the  top  bearing  shall  be 
struck  off  level  with  a  straight  edge,  and  shall  be  covered  with  a  rigid  top  bearing 
plate,  with  lower  surface  a  true  plane,  made  of  heavy  timbers  or  other  rigid  material, 
capable  of  distributing  the  test  load  uniformly  without  appreciable  bending.  The  test 
load  shall  be  applied  at  the  exact  center  of  this  top  bearing  plate  in  such  a  manner  as  to 
permit  free  motion  of  the  plate  in  all  directions.  For  this  purpose  a  spherical  bearing 
is  preferred,  but  two  rollers  at  right  angles  may  be  used.  The  test  may  be  made  without 
the  use  of  a  testing  machine  by  piling  weights  directly  on  a  platform  resting  on  the  top 
bearing  plate,  provided,  however,  that  the  weights  shall  be  piled  symmetrically  about  a 
vertical  line  through  the  center  of  the  pipe,  and  that  the  platform  shall  not  be  allowed  to 
touch  the  top  bearing  frame. 

The  frames  of  the  top  and  bottom  bearings  shall  be  made  of  timbers  so  heavy  as  to 
avoid  appreciable  bending  by  the  side  pressure  of  sand.  The  interior  surfaces  of  the 
frames  shall  be  dressed.  No  frame  shall  come  in  contact  with  the  pipe  during  the  test.  A 
strip  of  cloth  may,  if  desired,  be  attached  to  the  inside  of  the  upper  frame  on  each  side, 
along  the  lower  edge,  to  prevent  the  escape  of  sand  between  the  frame  and  the  pipe. 


'  For  requirements  for  this  sieve,  see  Standard  Specifications  for  Sieves  for  Testing  Pun>oses  (ASTM 
Designation:  E-11),   1933  Book  of  ASTM  standards,  Part  II,  p.  1244. 


Roadwav    and    Ballast 


SSI 


Bedding  of  Barrel 


j^: 


^^^^ 


aj4;::ji--=t-"T"  -"a-  -|-  y  -„- r  r ' ' 

"T^r---i.i__'i_Xj \  1 

Bj  irv-j.-i 1-- — l]  1 


'    '  ■    '  ' 


.K- L 

Kf L,- 


• 'TTf:-  S.IM 
SL I'-l- 


Bedding  of  Socket. 


.  Bolfs. 


k 


A 


A  U^l  kl  h 


V  llil  k>-l  fe 


^<"'ls  Upper 

Bearing     Frame. 


"V 


Side   View, 

Fig.  2. — Sand  Bearings 


ABSORPTION  TEST 

18.  Test  Specimens 

The  specimens  shall  be  sound  pieces,  with  all  edges  broken,  and  may  be  from  pipes 
broken  in  the  crushing  tests.  They  shall  be  from  12  to  20  sq.  in.  in  area,  and  shall  be  as 
nearly  square  as  they  can  be  readily  prepared.  They  shall  be  free  from  observable  cracks, 
fissures,  laminations  or  shattered  edges. 

19.  Identification 

Each  specimen  shall  be  marked  so  that  it  may  be  identified  with  the  pipe  used  in 
the  crushing  strength  test  from  which  the  specimen  was  taken.  The  marking  shall  be 
applied  so  that  the  pigment  used  shall  not  cover  more  than  1  percent  of  the  total 
superficial  area  of  the  specimen. 

20.  Number  of  Tests 

One  specimen  shall  be  tested  of  each  pipe  broken  in  crushing  strength  test. 


552 


Roadway   and    Bal last 


21.  Weighing  Apparatus 

The  balance  used  shall  be  sensitive  to  O.S  g.  when  loaded  with  1  kg.  and  weighing 
shall  be  read  to  the  nearest  1  g.  When  other  than  metric  weights  are  used,  the  same 
degree  of  accuracy  shall  be  obtained. 

22.  Procedure 

(a)  Drying — Preparatory  to  the  absorption  test,  the  specimen  shall  be  brought  to 
constant  weight  in  a  drier  or  oven  at  a  temperature  of  not  less  than  110  degrees  C.  (230 
degrees  F.) 

(b)  Immersion — After  reaching  constant  weight,  the  specimen  shall  be  placed  with 
other  similar  specimens  in  a  suitable  wire  receptacle,  packed  tightly  enough  to  prevent 
jostling,  covered  with  distilled  water  or  rainwater,  raised  to  the  boiling  point  and  boiled 
for  five  hours,  and  then  cooled  in  water  to  a  final  temperature  of  IS  to  25  degrees  C. 
(59  to  77  degrees  F.) 

(c)  Reweighing — The  specimen  shall  be  allowed  to  drain  for  one  minute,  and  after 
the  superficial  moisture  has  been  removed  by  towel  or  blotting  paper,  the  specimen  shall 
be  placed  upon  the  balance  and  weighed. 


r 

1 

1 
1 
1 

V  _     — 

I 

1 .      1 

—  _ » 

+ 

'^ 

V 

Fig.  3.  —  Apphca- 
tions  of  Dimensions 
Given   in  Table   2. 


23.  Calculation  and  Reporting  of  Results 

The  absorption  shall  be  calculated  as  percentage  of  the  initial  dry  weight.  The  results 
shall  be  reported  separately  for  each  individual  specimen,  together  with  the  mean  for  all 
the  specimens  from  the  same  shipment  of  pipe. 

24.  Acceptance  or  Rejection  on  Results  of  Test 

(a)  Failure  of  20  percent  of  the  specimens  to  meet  the  requirements  of  crushing 
strength  and/or  absorption  tests  shall  result  in  rejection  of  all  the  pipe  in  the  shipment 
or  delivery,  corresponding  to  the  sizes  thus  failing  to  comply;  except  that  in  the  event 
of  20  percent  of  the  specimens  in  any  size  failing  to  meet  the  requirements  the  manu- 


Roadway    and    Ballast SS3 

facturer  or  seller  may,  with  the  consent  of  the  purchaser,  furnish  for  test,  without 
charge,  additional  specimens  from  the  same  shipment.  In  case  more  than  80  percent 
of  the  specimens  tested,  including  those  first  tested,  shall  show  substantial  conformance 
for  each  of  the  various  tests  performed,  then  the  entire  shipment  or  delivery  for  this 
size  shall  be  accepted;  otherwise  it  shall  be  rejected. 

(b)  However,  in  case  of  failure  of  pipe  to  meet  the  requirements  under  the  speci- 
fied method,  and  the  accuracy  of  the  testing  machine  is  questioned,  a  retest  at  the 
request  of  the  manufacturer  shall  be  made  upon  a  machine  whose  accuracy  is  known  or 
the  machine  originally  used  shall  be  recalibrated  before  the  retest  is  made. 

(c)  In  addition  to  the  requirements  in  Paragraph  (a)  failure  of  10  percent  or  more 
of  the  individual  specimens  tested  to  develop  75  percent  of  the  average  crushing  strength 
requirements  shall  be  cause  for  the  rejection  of  the  shipment,  but  the  manufacturer  or 
seller  may  cull  the  pipe  and  submit  the  balance  of  the  shipment  for  retest,  and  if  the 
shipment  then  conforms  to  all  of  the  requirements  of  these  specifications  it  shall  be 
accepted. 

SIZES,  DIMENSIONS  AND  PERMISSIBLE  VARIATIONS 

25.  Sizes  and  Dimensions 

Pipes  shall  be  furnished  of  the  sizes,  internal  diameter  and  with  the  dimensions  given 
in  Table  2. 

26.  Permissible  Variations 

The  permissible  variations  from  the  dimensions  given  in  Table  2  shall  not  exceed 
those  specified  in  Table  3.  Where  the  average  diameter  in  the  spigot  is  larger  than  the 
nominal  size,  the  average  diameter  at  the  inside  of  the  socket  shall  be  increased  by  the 
same  amount.  Where  the  thickness  of  the  barrel  is  increased  beyond  that  given  in  Table  2, 
in  order  to  meet  the  specified  requirements  of  strength,  the  diameter  at  the  inside  of 
the  socket  shall  be  increased  by  double  the  increase  in  thickness  of  the  barrel.  Pipes 
intended  to  be  straight  shall  have  a  maximum  ordinate  as  measured  from  the  concave 
side  of  the  pipe  not  to  exceed  %  inch  per  foot  of  length. 

WORKMANSHIP  AND  FINISH 

27.  Absence  of  Defects 

Pipes  shall  be  substantially  free  from  fractures,  large  or  deep  cracks  and  blisters, 
laminations  and  surface  roughness. 

28.  Salt  Glaze 

The  glaze  shall  consist  of  a  continuous  layer  of  salt  glaze  substantially  free  from 
large  blisters  or  large  pimples.  No  blisters  shall  exceed  3  inches  in  diameter  and  no 
blisters  or  pimples  shall  project  more  than  %  inch  above  the  surrounding  surface  of  the 
pipe  for  sizes  up  to  and  including  18  inches  internal  diameter.  For  sizes  over  18  inches 
internal  diameter  no  blisters  shall  exceed  in  diameter  more  than  2  inches  per  foot  of  the 
internal  diameter  of  the  pipe,  nor  project  above  the  surrounding  surface  of  the  pipe  more 
than  %  inch  per  foot  of  the  internal  diameter  of  the  pipe. 

Not  more  than  10  percent  of  the  inner  surface  of  any  pipe  barrel  shall  be  bare  of 
glaze  except  the  socket,  where  it  may  be  entirely  absent.  Glazing  shall  not  be  required  on 
the  outer  surface  of  the  barrel  at  the  spigot  ond  for  a  distance  from  the  end  of  the  pipe 
equal  to  the  specified  depth  of  socket.  There  shall  be  no  well  defined  network  of  crazing 
Unes  or  hair  cracks.  , 


554 


Roadway    and    Ballast 


Table  2 
Dimensions  of  Clay  Culvert  Pipe" 


Internal  Laying 

Diameter  Length 

(D)  Inches  (L)  Ft. 

U   3 

IS   3 

18   3 

21   3 

24 3 

27  3 

30   3 

33   3 

36   3 


Inside 

Diam.  at 

Mini- 

y^Inch 

mum 

Above 

Depth 

Taper 

Thick- 

Thick- 

Base of 

of 

of 

ness  of 

ness  of 

Socket 

Socket 

Socket 

Barrel 

Socket 

(Ds)  In}"^ 

(Ls)  In. 

(H 

L.) 

(T)  In. 

(Tn) 

155/^ 

2V4 

20 

1% 

The  thickness 

19^ 

23/4 

20 

1/2 

of  the  socket 

23 

3 

20 

iVs 

y2   inch  from 

26^ 

3J4 

20 

2^ 

its  outer  end 

303/g 

m 

20 

2V2 

s  h  a  1 1  be  not 

34^ 

3/2 

20 

ly^ 

less    than 

375/^ 

33/2 

20 

3 

three-fourths 

41J4 

4 

20 

3^ 

of   the   speci- 

4434 

4 

20 

3/2 

fied   thickness 

of   the  barrel 

of  the  pipe. 

"  Applications  of  dimensions  given  in  this  table  are  shown  in  Fig.  3. 

••  When  pipes  are  furnished  having  an  increase  in  thiclcness  over  that  given  in  last  column,  the 
diameter  of  socket  shall  be  increased  by  an  amount  equal   to  twice  the   increase  of  thickness  of  barrel. 

<>  When  the  pipes  furnished  have  an  average  diameter  larger  than  the  nominal  size,  the  inside 
diameter  of  the  socket  shall  be  greater  by  the  same  amount  than  the  values  given  in  the  third  column. 


Table  3 
Permissible  Variations  in  Dimensions  of  Clay  Culvert  Pipe 
Limits  of  Permissible  Variation  in: 
Lengths  of  Internal 

Nominal                 Length,  Two  Opposite           Diameter  Depth 

Size                      inches     Sides,  inches               inches  of 

Internal                    per            per  foot        Spigot           Socket  Socket 

Diameter,  in.  ft.( — )         of  length      (-{-or — )     (-{-or — )       in.  ( — ) 

12    ^                  ^                  ^                  H  Ya 

IS    Ya                 ^                 ^                 %  Ya 

18  Ya              iff              tfe              Yi  Ya 

21  Ya              ^              Y2              A  54 

24    3/^                  J4                  T^ff                  §^  J4 

2J  H               Ya               n               H  Ya 

30  Yfi              Ya              Vi              H  Ya 

33   Yi              Ya              H              Va  Ya 

36   V^               Ya               Va               it  Ya 


Thickness 

of 

Barrel 

in.  (-) 

% 

A 

Ya 
Ya 

Note — The  minus  sign  ( — )  alone  indicates  that  the  plus  variation  is  not  limited,  the  plus  and 
minus  sign  (-|-  or  — )   indicates  variation  in  both  excess  and  deficiency  in  dimensions. 

29.  Finish  of  Ends 

The  ends  of  the  pipes  shall  be  square  with  their  longitudinal  axes,  except  as  provided 
in  Table  3. 

MARKING,  INSPECTION  AND  REJECTION 

30.  Marking 

Each  length  of  pipe  shall  bear  the  initials  or  name  of  the  person,  company  or  corpora- 
tion by  whom  manufactured  and  the  location  of  the  factory.  The  markings  shall  be 
indented  on  the  exterior  of  the  pipe  near  the  socket  and  shall  be  plainly  legible  for 
purposes  of  identification. 


Roadway    and    Ball  a  s  t 555 


31.  Inspection 

All  pipes  shall  be  subject  to  inspection  at  the  factory,  site  of  project  or  other  point 
of  delivery  by  a  competent  inspector  employed  by  the  purchaser.  The  purposes  of  the 
inspection  shall  be  to  cull  and  reject  pipes  which,  independent  of  the  physical  tests  herein 
specified,  fail  to  conform  to  the  requirements  of  these  specifications. 

32.  Rejection 

Pipes  shall  be  subject  to  rejection  on  account  of  the  following: 

(a)  Variations  in  any  dimension  exceeding  the  permissible  variations  given  in 
Table  3. 

(b)  Fractures  or  cracks  passing  through  the  shell  or  socket  except  a  single  crack 
at  the  spigot  end  of  the  pipe  not  exceeding  75  percent  of  the  depth  of  the  socket,  or  a 
single  fracture  in  the  socket  not  exceeding  3  inches  measured  around  the  circum- 
ference, nor  2  inches  lengthwise. 

(c)  Chips  or  fractures  on  the  interior  of  the  pipe  exceeding  2  inches  in  length, 
1  inch  in  width,  and  of  a  depth  more  than  one-quarter  of  the  thickness  of  the  shell. 

(d)  Blisters  which  are  broken  or  which  exceed  the  dimensions  specified  in 
Section  28. 

(e)  Fire  cracks  or  hair  cracks  sufficient  to  impair  the  strength,  durability  or 
serviceability  of  the  pipe. 

(f)  Variation  of  more  than  ^  inch  per  linear  foot  in  alinement  of  a  pipe 
intended  to  be  straight. 

(g)  Glaze  which  does  not  conform  with  these  specifications  as  specified  in 
Section  28. 

33.  Marking  of  Rejected  Specimens 

All  pipes  accepted  may  be  plainly  marked  by  the  inspector.  Rejected  pipes  shall  not 
be  marked  so  as  to  be  defaced  or  to  impair  their  value,  but  shall  be  replaced  by  the 
manufacturer  or  seller  with  pipes  which  meet  the  requirements  of  these  specifications, 
without  additional  cost  to  the  purchaser. 


Report  on  Assignment  3  (b) 

Pipe  Line  Crossings — Specifications,  for  Non-inflammable 
Substances  Under  Pressure 

W.  C.  Swartout  (chairman,  subcommittee),  F.  W.  Capp,  J.  A.  Given,  Paul  McKay,  G.  W. 
Payne,  L.  H.  Roden,  E.  M.  Smith. 

In  1933,  the  Association  adopted  Specifications  for  Pipe  Line  Crossings  Under  Rail- 
way Tracks.  These  are  inclusive  specifications  for  pipe  lines  carrying  all  substances  and 
were  worked  out  in  collaboration  with  Committee  20  of  this  A.ssociation  and  the  American 
Petroleum  Institute  after  a  protracted  series  of  conferences. 

It  is  believed  that  these  specifications  have  been  found  satisfactory  and  workable, 
but  they  are  too  rigorous  for  pipe  Hnes  carrying  non-inflammable  substances,  hence  the 
assignment  for  this  year's  work  "Pipe  line  crossings — Specifications,  for  non-inflammable 
substances  under  pressure." 


556 Roadway    and   Ballast 

Your  committee  has  prepared  such  specifications  which  are  offered  as  information 
this  year  for  the  purpose  of  inviting  criticisms  and  suggestions  with  the  thought  of  sub- 
mitting them,  with  any  revisions  deemed  desirable,  at  the  1942  convention  for  adoption 
and  inclusion  in  the  Manual.  Before  these  specifications  can  be  adopted  and  included  in 
the  Manual,  it  will  be  necessary  to  adopt  a  revision  of  the  Specifications  for  Pipe  Line 
Crossings  Under  Railway  Tracks  Carrying  Inflammable  Substances  referred  to  above. 

The  committee  recommends  that  the  first  paragraph  of  Specifications  for  Pipe  Line 
Crossings  under  Railway  Tracks,  A.  For  Inflammable  Substances,  (page  1-2S  of  Manual) , 
be  revised  by  deleting  the  last  clause  of  the  first  sentence  reading  "or  any  substance 
which  from  its  nature  or  pressure  might  cause  damage  if  escaping  on  or  in  vicinity  of 
railway  property"  as  shown  below.  This  revision  is  necessary  in  order  that  separate 
specifications  may  be  submitted  to  cover  Pipe  Line  Crossings  under  Railway  Tracks, 
B.  For  Non-inflammable  Substances. 

Present  Form 

Pipe  lines  included  under  these  specifications  are  those  installed  to  carry  oil,  gas, 
gasoline  or  other  inflammable  or  highly  volatile  substance,  under  pressure,  or  any  sub- 
stancef  which  from  its  nature  or  pressure  might  cause  damage  if  escaping  on  or  in  vicinity 
of  railway  property.  Gas  transmission  and  distribution  lines  in  city  streets,  carrying  less 
than  45  pounds  pressure,  are  not  to  be  considered  as  coming  under  these  specifications. 

Proposed  Form 

Pipe  lines  included  under  these  specifications  are  those  installed  to  carry  oil,  gas, 
gasoline  or  other  inflammable  or  highly  volatile  substance,  under  pressure.  Gas  trans- 
mission and  distribution  lines  in  city  streets,  carrying  less  than  45  pounds  pressure,  are 
not  to  be  considered  as  coming  under  these  specifications. 


It  is  further  recommended  that  each  paragraph  of  these  specifications  be  given  a 
heading  as  shown  in  skeleton  form  below; 

1.  Scope 

Pipe  hnes  included  under  these,  etc. 

2.  Installation 

Pipe  lines  under  railway  tracks,  etc. 

3.  Carrier  Pipe 

Carrier  line  pipe  inside,  etc. 

4.  Casing  Pipe 

Casing  pipe  and  joints  may,  etc. 

5.  Seals 

Where  ends  of  casing  are  below  ground,  etc. 

6.  Depth  of  Casing 

Where  practicable  the  depth  from,  etc. 

7.  Length  of  Casing 

Casing  shall  extend  at  least,  etc. 


Roadway    and    Ball  a  s  t 


S57 


8.  Shut-Off  Valves 

Where  warranted  by  special  local  conditions,  etc. 

9.  Location 

Pipe  lines  shall,  where  practicable,  etc. 

10.  Topography 

Crossings  under  railway  tracks,  etc. 

11.  Approval  of  Plans 

Plans  for  proposed  crossing,  etc. 


Your  committee  submits  the  following  specifications  as  information  and  invites 
comments  and  criticisms.  It  is  proposed,  as  stated  above,  to  submit  these  to  the  1942 
convention  for  inclusion  in  the  Manual. 


309.  Pipe  Line  Crossings — Specifications 

B.  FOR  NON-INFLAMMABLE  SUBSTANCES 

1.  Scope 

Pipe  hnes  included  under  these  specifications  are  those  installed  to  carry  steam, 
water  or  any  non-inflammable  substance  which  from  its  nature  or  pressure  might  cause 
damage  if  escaping  on  or  in  the  vicinity  of  railway  property. 

2.  Installation 

Pipe  lines  under  railway  track  shall  be  encased  in  a  larger  pipe  or  conduit  installed 
as  indicated  in  Fig.  1. 

5  o  rfa  ce  -^ 
'Subgrode       /^ 


^^ 


^^=^r 


4.Ft6Ir\Mir\. 


/-No  5cal-5ceNo+el       • 


«— ^ 


.^im,-^ 


'\^5eal-iec  Hotel 


^  1-5  D- 

NOTE:- 

l.  Seal  not  retyj\red  if  Casing  ends  oboVc  Ground  Where 
Drainage  ib  available. 

Fig.   I. 

3.  Carrier  Pipe 

Carrier  line  pipe  inside  the  casing  under  the  railway  track  and  right-of-way  shall 
be  of  approved  construction. 

4.  Casing  Pipe 

Casing  pipe  and  joints  may  be  of  any  approved  conduit  construction  and  shall  be 
capable  of  withstanding  the  load  of  railway  roadbed,  track  and  traffic;  al.so  shall  be  so 
constructed  as  to  prevent  leakage  of  any  matter  from  the  casing  or  conduit  throughout 


558 Roadway    and    Ballast 

its  length  under  the  track  and  railway  right-of-way  except  at  the  ends  of  the  casing  or 
conduit  where  the  ends  are  left  open.  The  casing  shall  be  so  installed  as  to  prevent  the 
formation  of  a  waterway  under  the  railway. 

Casing  shall  be  installed  with  even  bearing  throughout  its  length  and  shall  slope  to 
one  end. 

The  inside  diameter  of  the  casing  shall  be  at  least  2  inches  greater  than  the  largest 
outside  diameter  of  the  carrier  pipe,  joints  or  couplings. 

5.  Seals 

Where  the  ends  of  the  casing  are  below  ground  they  shall  be  suitably  protected 
against  the  entrance  of  foreign  material,  which  might  prevent  ready  removal  of  the 
carrier  pipe. 

Where  the  ends  of  the  casing  are  at  or  above  ground  surface  and  above  high  water 
level  they  may  be  left  open,  provided  drainage  is  afforded  in  such  a  manner  that 
leakage  will  be  conducted  away  from  the  roadbed  and  structures. 

6.  Depth  of  Casing 

The  top  of  the  carrier  pipe  shall  be  below  the  frost  line,  and  at  its  closest  point 
shall  not  be  less  than  4^  feet  below  base  of  railway  rail.  On  other  portions  of  the  rail- 
way right-of-way  where  the  casing  is  not  directly  beneath  any  track  the  depth  from  the 
surface  of  the  ground  and  from  the  bottom  of  ditches  to  the  top  of  the  casing,  shall  be 
not  less  than  3  feet.  Where  it  is  not  practicable  to  secure  the  above  depths,  special 
construction  shall  be  used. 

7.  Length 

Casing  shall  extend  each  side  from  the  center  line  of  the  outside  track,  measured 
at  right  angles,  a  minimum  distance  of  11  feet  -|-  5  feet  -f-  1.5D  (Where  D  equals  the 
depth  of  the  bottom  of  the  casing  below  subgrade).  See  Fig.  1.  If  additional  tracks  are 
constructed  in  the  future,  the  casing  shall  be  correspondingly  extended. 

8.  Shut-Off  Valves 

Where  warranted  by  special  local  conditions,  and  when  mutually  agreed  to  by  the 
railroad  company  and  the  owner  of  the  pipe  line,  accessible  emergency  shut-off  valves 
shall  be  installed  within  effective  distance  at  each  side  of  the  crossing. 

9.  Approval  of  Plans 

Plans  for  a  proposed  crossing  shall  be  submitted  to  and  approved  by  the  Chief 
Engineer  or  authorized  representative  of  the  railway  before  installation  is  begun  and 
the  execution  of  the  work  on  the  railway  right-of-way,  including  the  supporting  of  the 
track,  shall  be  subject  to  his  inspection  and  direction. 


Roadway    and    Ballast 559 

Report  on  Assignment  4  (a) 

Formation  of  the  Roadway — Settlement;  Shrinkage,  Subsidence 

Paul    Chipman    (chairman,    subcommittee),    F.    W.    Alexander,    E.    J.    Beugler,    Clifton 
Brannon,  Herbert  Ensz,  Albert  Haertlein,  G.  E.  Ladd,  Raymond  Swenk. 

In  order  to  supplement  the  substance  of  present  Manual  material  relating  to  shrink- 
age and  subsidence  by  adding  the  conclusions  reported  last  year  as  information,  the 
committee  recommends  that  material  under  "C.  Shrinkage  and  Subsidence",  pages  1-35 
and  1-36,  be  withdrawn  and  that  it  be  replaced  by  new  material  under  the  caption 
"C.  Settlement  of  Embankments." 

Present  Form 

C.  SHRINKAGE  AND  SUBSIDENCE 

1.  General 

(a)  In  determining  the  allowance  for  shrinkage  to  be  made  in  a  fill,  it  should  be 
remembered  primarily  that  it  is  easier  to  add  to  the  height  of  a  fill  that  settles  than  to 
lower  the  track  if  the  settlement  does  not  amount  td  as  much  as  that  anticipated  in  the 
original  allowance.  Therefore,  unless  the  shrinkage  of  a  material  is  well  known  in  the 
conditions  under  which  the  fill  is  made,  it  is  best  to  be  well  on  the  safe  side;  i.e.,  little 
or  no  allowance  should  be  made  in  height;  the  extra  material,  when  possible,  being  de- 
posited where  it  will  be  conveniently  available  for  raising  the  track,  as  required.  The 
allowance  in  width  should  be  from,  about  5  percent  to  20  percent  of  the  height  of  the 
fill,  depending  on  the'material  and  conditions. 

(b)  The  material  used  for  fill  varies  in  shrinkage  from  sound,  non-disintegrating 
rock,  or  gravel,  which  is  least,  to  certain  swelling  clays,  which  give  the  greatest  shrinkage 
both  in  compactibility  and  erosion  at  the  slopes.  While  vegetable  loam  has  a  large  per- 
centage of  actjial  shrinkage,  it  so  quickly  produces  a  protection  cover  of  vegetation  that 
the  shrinkage  due  to  erosion  is  usually  small.  Where  frozen  material  must  be  used  in 
making  a  fill,  heavy  settlement  must  be  expected,  and  this  is  to  be  avoided  where  possible. 

(c)  The  material  and  contour  of  the  ground  supporting  the  fill  is  also  a  matter  of 
considerable  importance.  This  is  especially  so  where  unstable  material  is  encountered. 

(d)  The  method  of  making  the  fill  should  also  be  carefully  considered.  When  the 
tracks  are  being  raised  under  traffic,  the  vertical  shrinkage  will  be  largely  taken  care  of 
in  the  course  of  the  work.  When  the  fill  is  made  by  teams  or  such  means  as  to  reason- 
ably tamp  and  compact  the  fill  in  thin  layers,  as  it  is  made,  the  same  is  true.  Where, 
however,  the  fill  is  made  by  trestle  and  without  puddling  or  other  method  of  compacting, 
the  settlement  is  apt  to  be  considerable. 

2.  Allowance  for  Shrinkage  and  Subsidence  in  Estimating 

(a)  Shrinkage: 

(1)  Figure  a  shrinkage  of  10  percent  of  quantities  measured  in  excavation  on  earth 
removed  from  excavation  to  embankment. 

(2)  Ascertain  local  conditions  and  results  and  use  them  as  a  guide  in  estimating 
swell  of  rock,  considering  nature  of  formation  and  method  of  handling. 

(b)  Subsidence: 

(1)  Some  subsidence  occurs  under  all  embankments  built  on  any  ground  except 
rock.  It  is  very  light  in  sand  and  gravel.  The  percentage  of  subsidence  is  in  general 
greater  under  small  fills  than  under  large  ones. 


560 Roadway    and    Ballast 

(2)  Subsidence  is  due  to  compression  or  displacement  of  the  strata  of  earth  under 
the  embankment. 

(3)  Subsidence  must  always  be  anticipated  in  swamps,  marshes  and  bogs,  and  any 
land  on  which  there  is  standing  water. 

(4)  Serious  subsidence  is  local  and  it  is  impossible  to  fix  any  rule  as  a  guide  in 
estimating  or  anticipating  same. 

Proposed  Form 

C.  SETTLEMENT  OF  EMBANKMENTS 

Shrinkage 

The  shrinkage  of  an  embankment  after  construction  depends  almost  entirely  on 
two  factors.  One  is  the  material  of  which  it  is  made,  the  other  the  methods  used  in 
making  it. 

Kind  of  Material 

Embankments  made  of  rock  which  does  not  disintegrate  or  of  gravel  have  prac- 
tically no  shrinkage,  and  shrinkage  of  clean  sand  is  small.  For  other  materials,  the 
method  of  placement  is  the  controlling  factor.  Aside  from  this  factor,  shrinkage  in  gen- 
eral increases  with  the  amount  of  clay  or  organic  matter,  or  both,  in  the  soil  mixture, 
being  greatest  in  certain  clays  which  swell  extensively  in  the  process  of  excavation. 

Construction  Methods 

Future  shrinkage  of  compactable  soils  can  be  eliminated ,  by  rolling,  combined  with 
regulation  of  the  moisture  content  to  approach  the  optimum  as  determined  by  tests. 
In  fills  made  by  dumping  from  above,  as  in  filling  bridges,  widening  banks,  or  end 
dumping  of  trucks,  the  natural  shrinkage  is  not  greatly  reduced  by  the  construction 
process,  and  additional  compaction  at  such  places  is  desirable  and  economical.  Fills 
made  with  heavy  hauling  equipment,  with  teams  and  scrapers,  or  by  lifting  track 
under  traffic  are  quite  compact  and  have  little  shrinkage.  Additional  compaction  by 
sprinkling  and  rolling  is  desirable  where  the  soil  is  dry  or  where  heavy  or  fast  traffic  is 
to  be  carried. 

Allowance  for  Shrinkage 

It  is  easier  to  add  to  the  height  of  a  fill  that  settles  than  to  lower  the  track.  No 
vertical  allowance  for  future  settlement  should  therefore  be  made  unless  it  can  be 
estimated  from  past  behavior  of  the  same  material  under  similar  conditions;  but  addi- 
tional width  to  the  extent  of  about  three  times  the  maximum  probable  shrinkage  should 
be  provided. 

Shrinkage  from  Cut  to  Fill 

The  foregoing  relates  to  shrinkage  after  construction.  Shrinkage  during  construction 
from  volume  in  excavation  to  volume  in  embankment  likewise  varies  with  the  kind  of 
material  and  method  of  construction  but  an  average  figure  of  10  percent  for  earth  will 
usually  be  close  enough  for  estimating  quantities  and  distribution  of  earthwork.  For 
swell  of  rock  the  behavior  of  similar  material  under  similar  conditions  should  be 
ascertained  if  possible. 

Subsidence 
1.  Some  subsidence  occurs  under  all  embankments  built  on  any  ground  except  rock. 
It  is  very  light  in  sand  and  gravel.  The  percentage  of  subsidence  is  in  general  greater 
under  small  fills  than  under  larger  ones. 


Roadway    and    Ballast 561 

2.  Subsidence  is  due  to  compression  or  displacement  of  the  earth  under  the 
embankment. 

3.  Subsidence  must  always  be  anticipated  in  swamps,  marshes  and  bogs  and  any 
land  on  which  there  is  standing  water. 

4.  Where  any  considerable  amount  of  subsidence  is  anticipated,  particularly  sub- 
sidence due  to  displacement,  adequate  depth  tests  should  be  taken  and  a  study  of  the 
material  made,  in  order  to  determine  the  method  of  treatment  and  to  make  an  estimate 
of  the  amount  of  filling  material  required. 

5.  Good  construction  practice  will  avoid  future  subsidence  by  carrying  the  fill  to 
solid  ground  by: 

(a)  Setting  the  partly  made  fill  by  means  of  explosives  or  jetting. 

(b)  Excavating  a  short  section  of  the  soft  material  and  replacing  it  with  suitable 
material  dumped  over  the  end  of  the  advancing  fill. 

(c)  A  combination  of  these  methods. 

6.  Railroad  embankments  subject  to  continuing  subsidence  should  be  studied  to 
determine  whether  their  stabilization  would  be  economically  justified. 


Report  on  Assignment  4  (b) 
Placing  Material  in  Embankments 

Consider  Preparation  of  Receiving  Surface;  Compaction  by  Layers;  Spread- 
ing Travel  of  Equipment,  Rolling,   Jetting,   Moisture  Content, 
Density  Requirements 

Paul    Chipman    (chairman,    subcommittee),    F.   W.    Alexander,    E.    J.    Beugler,    Clifton 
Brannon,  Herbert  Ensz,  Albert  Haertlein,  G.  E.  Ladd,  Raymond  Swenk. 

Highway  Practice 

Special  compaction  of  embankments  has  in  recent  years  become  the  standard  prac- 
tice of  a  number  of  state  highway  departments  and  has  been  used  in  railroad  construction 
to  a  limited  but  growing  extent.  Specifications  for  such  work  all  require  that  material  be 
spread  in  level  layers  of  uniform  thickness,  usually  six  or  eight  inches,  and  rolled  with 
either  a  tamping  (sheepsfoot)  roller  or  a  ten-ton  or  heavier  self-propelled  roller;  although 
in  some  specifications  only  the  former  is  permitted.  Requirements  as  to  the  amount  of 
rolling  vary  in  different  specifications.  The  minimum  number  of  trips  may  be  specified, 
rolling  until  no  further  compaction  takes  place,  or  rolling  to  the  satisfaction  of  the 
engineer;  but  the  tendency  is  toward  requiring  90  percent  or  more  of  the  maximum 
density  at  the  optimum  moisture  content  as  determined  by  tests  of  the  material. 

In  these  tests,  which  were  devised  by  R.  R.  Proctor,  field  engineer,  Bureau  of 
Waterworks  and  Supply  of  Los  Angeles,  Calif.,  the  moisture  content  most  favorable  to 
compaction  is  determined  by  measuring  resistance  to  penetration  at  different  moisture 
contents,  and  the  density  of  compacted  soil  at  the  optimum  moisture  content  is  ascer- 
tained. These  tests  and  the  apparatus  for  making  them  have  been  standardized  and  the 
latter  may  be  purchased  in  the  market.  Further  description  may  be  found  in  the  refer- 
ences given  in  the  bibliography  included  in  this  report.  The  "Soils  Manual"  issued  by 
the  State  Highway  Commission  of  Kansas,  is  especially  complete  in  regard  to  the  theory 
and  application  of  these  tests. 


562 Roadway    and    Ballast __^ 

The  foregoing  relates  to  compactable  materials.  Rock,  gravel  and  clean  sand  do  not 
compact  under  rolling;  but  spreading  in  layers  is  a  general  requirement,  two  feet  being 
a  thickness  commonly  used.  The  practice  of  settling  embankments  by  jetting  or  ponding, 
or  both,  has  been  used  to  some  extent  by  certain  highway  departments.  It  has  now  been 
largely  superseded  by  mechanical  compaction  where  the  materials  admit,  but  is  still  used 
to  some  extent  for  clean  sand  and  sandy  gravel. 

If  all  shrinkage  of  a  fill  is  to  be  prevented,  it  is  not  consistent  to  place  it  on  loose 
soil.  Specifications,  therefore,  usually  require  that  under  fills  which  are  to  be  compacted, 
the  surface  be  plowed  and  then  compacted  in  the  same  manner  as  the  fill  itself. 

Applicability  to  Railroad  Embankments 

The  extent  to  which  such  methods  are  applicable  to  railroad  construction  is  a  sub- 
ject that  merits  discussion.  A  small  amount  of  unequal  settlement  under  a  concrete 
highway  produces  a  roughness  of  surface  that  can  be  corrected  only  at  considerable 
expense;  but  in  a  railroad  fill,  such  irregularities  are  ehminated  by  surfacing  the  track. 
This  being  accompHshed,  the  slight  dip  below  the  original  grade  line  which  might  result 
from  shrinkage  of  a  fill  made  with  modern  equipment,  but  without  rolhng  or  sprinkling, 
would  have  no  appreciable  effect  on  cost  of  operation  or  riding  comfort. 

The  sole  disadvantage  of  the  practice  is  its  initial  cost.  This  is  made  up  of  two 
parts,  the  cost  of  additional  compaction  and  the  cost  of  additional  material  required  to 
make  the  more  compact  embankment.  The  latter  is  relatively  small,  and  for  higher  fills 
is  practically  offset  by  not  having  to  widen  them  to  provide  a  base  for  future  hfts 
necessitated  by  shrinkage. 

The  cost  of  sprinkling  is  the  variable  element.  For  earth  dams,  where  impermeability 
is  essential,  a  close  approach  to  the  optimum  moisture  content  is  desirable;  but  a  degree 
of  compaction  that  will  prevent  appreciable  shrinkage  can  be  attained  at  the  moisture 
content  usually  found  in  compactable  soils  when  freshly  excavated.  In  most  localities, 
the  necessity  for  adding  water  in  compacting  railroad  fills  would  be  exceptional. 

There  is  quite  a  range  in  the  cost  of  such  work  reported  by  a  number  of  state 
highway  departments,  also  the  Missouri  Pacific  Lines,  as  shown  below: 

Illinois    No  definite  figure,  but  mechanical  compaction  costs  less  than 

the  water  soaking  formerly  used,  which  cost  3  cents  to  4  cents 
per  cubic  yard. 

Averages 

1937       1938      1939 

Cents     Cents     Cents 

Kansas    Rolling  and  tamping 3.4  2.1         1.8 

Class  A  Compaction 2.9        3.8 

Class  B  "  2.0         2.2 

Missouri  Average  4  cents  in  1939,  not  including  water. 

Ohio    Think  compaction  has  not  increased  cost. 

North   Carolina    2  cents  to  4  cents. 

Minnesota    1  cent  to  2  cents,  not  including  water,  which  might  vary  from 

nothing  up  to  5  cents  or  more  for  very  dry  soil. 

Missouri  Pacific  Lines  .  .    2  cents  or  less,  not  including  water. 

In  some  of  these  states,  the  only  basis  for  measuring  this  cost  is  a  comparison  of 
grading  prices  before  and  (after  the  specifications  were  changed  to  provide  for  compac- 
tion. This  accounts  for  the  Ohio  opinion  and  the  indefiniteness  of  others.  In  Kansas  the 
case  is  clear  cut,  as  compaction  is  a  separate  item  in  bids  and  contracts.  As  grading  con- 
tractors do  more  of  this  work,  the  price  will  possibly  be  lower,  but  at  present  2  cents 
per  cubic  yard  is  as  low  a  figure  as  should  be  used  for  estimates  and  comparisons. 


Roadway    and    Ballast 563 

In  grading  operations  of  any  considerable  extent,  the  material  is  now  hauled  in 
heavy  units  of  equipment  that  are  very  effective  agents  of  consolidation,  if  the  material 
be  spread  in  layers  and  concentration  of  equipment  travel  is  avoided.  Comparatively 
little  grading  by  such  methods  has  been  done  on  railroads,  and  only  a  fraction  of  that 
so  done  has  been  further  compacted  by  rolling,  either  with  or  without  regulation  of  the 
moisture  content.  No  definite  figures  are  therefore  available  as  to  the  saving  in  main- 
tenance expense  ^that  results  from  thorough  compaction.  It  is  known  that,  while  main- 
tenance expense  due  to  shrinkage  of  fills  made  with  heavy  hauling  equipment  is  small, 
such  expense  may  be  entirely  eliminated  by  thorough  compaction,  as  such  treatment 
definitely  does  away  with  future  shrinkage.  Compaction  has  no  effect  upon  subsidence, 
which  is  the  usual  cause  of  serious  settlement  and  is  dealt  with  in  a  previous  report  by 
this  committee. 

What  effect  thorough  compaction  of  the  subgrade  would  have  on  the  formation  of 
water  pockets  can  only  be  surmised,  as  no  evidence  exists.  Probably  no  amount  of  com- 
paction would  prevent  the  depression  that  is  formed  under  each  rail  by  the  heavier 
tamping  that  is  done  there.  Water  pockets  start  from  these  depressions  which,  although 
they  may  not  grow  so  fast  or  get  so  deep  in  a  more  compact  subgrade,  would  also  not 
drain  as  readily. 

In  most  cases  compactable  soil  when  freshly  excavated  contains  enough  moisture  to 
consolidate  effectively  under  the  rolling  of  heavy  equipment  or  the  trampling  of  animals. 
However,  there  are  many  sections  where  at  times  this  is  not  true,  and  the  material  as 
excavated  is  too  dry  to  compact  properly.  In  such  cases,  sprinkhng  and  rolling  is 
necessary  to  obtain  a  satisfactory  compaction. 

In  situations  where  compactable  material  is  not  subject  to  the  rolling  of  heavy 
hauUng  equipment,  such  as  in  filling  bridges  and  trestles,  widening  banks,  or  backfilling 
behind  abutments,  or  retaining  walls,  spreading  in  layers  and  special  compaction  is 
necessary  if  settlement  is  to  be  avoided.  Layers  should  be  sloped  away  from  abutments 
and  walls,  as  tests  prove  that  the  initial  thrust  is  reduced  thereby. 

There  are  points  of  fixed  elevation  such  as  bridges,  tunnels,  and  crossings,  where  the 
original  grade  Une  must  be  maintained.  If  shrinkage  could  be  made  good  at  such  points 
in  a  single  ballast  lift,  the  cost  would  generally  be  less  than  compaction  of  the  entire 
fill.  But  shrinkage  takes  place  gradually  and  many  surfacings  over  a  term  of  years,  with 
perhaps  light  apphcations  of  ballast,  are  usually  required,  at  correspondinglj'  greater 
expense. 

It  is  difficult  to  so  route  equipment  travel  that  the  edges  of  a  layer  will  receive  as 
thorough  compaction  as  other  portions.  Rolling  of  the  edges  is  desirable,  especially  for 
high  fills,  even  if  not  practiced  elsewhere. 

In  some  states  this  process  is  applied  to  all  state  highways;  in  others,  to  all  except 
secondary  roads  that  are  not  to  receive  a  rigid  surface.  Its  justification  on  railroads 
depends  largely  upon  the  nature  and  extent  of  the  traffic.  Under  heavy  or  fast  traffic, 
surfacing  to  take  up  settlement  must  be  done  more  frequently  and  at  greater  cost  than  if 
traffic  is  light  or  slow. 

Where  the  new  fill  is  to  carry  fast  or  heavy  traffic  from  the  start,  as  in  the  case  of  a 
change  of  line,  special  compaction  may  well  be  justified  as  an  insurance  against  excessive 
expense  for  lifting  and  surfacing  track  and  possible  slowing  up  of  traffic.  Further 
experience  will  make  possible  a  more  definite  appraisal  of  its  benefits. 


564  Roadway    and    Ballast 

Bibliography 
Compaction  of  Embankments 

Engineering  News-Record,  Vol.  Ill,  Aug.  31,  Sept.  7,  21,  28,  1933;  R.  R.  Proctor. 

Engineering  News-Record,  Vol.  114,  Apr.  18,  1935;  Pages  565,  566. 

Soils  Manual  for  the  Control  and  Inspection  of  Earthwork.  State  Highway  Com- 
mission of  Kansas. 

Revision  of  the  Grading  Specifications 

(page   1-37  of  Manual) 

Provision  for  sprinkling  or  rolling  or  both,  in  cases  where  such  treatment  is  desirable, 
calls  for  the  revision  of  Sections  33  and  34  of  the  Specifications  for  the  Formation  of  the 
Roadway. 

Formation  in  layers  is  such  an  important  factor  in  obtaining  a  compact  fill  that  it 
should  be  required,  except  where  otherwise  directed.  Such  direction  would  be  given  in 
the  case  of  end  dumping  by  wheeled  scrapers,  or  by  trucks  on  a  fill  across  soft  ground, 
or,  in  some  cases,  where  an  incompactable  material  such  as  rock,  gravel  or  clean  sand 
is  used. 

Uniform  spreading  of  equipment  travel  is  also  an  important  factor  in  building  a 
compact  fill,  and  should  be  required,  unless  otherwise  directed.  In  other  words,  forma- 
tion in  layers  and  spreading  travel  of  equipment  should  be  the  rule,  instead  of  the 
exception,  as  Section  33  in  its  present  form  would  imply. 

The  committee  recommends  that  Sections  33  and  34  of  the  Specifications  for  the 
Formation  of  the  Roadway  be  withdrawn  and  that  they  be  replaced  by  new  Sections  33 
and  34. 

Present  Form 
33.  Formation  in  Layers 

When  directed,  embankments  shall  be  built  in  horizontal  layers  of 

( )  inches  in  thickness.  The  layers  must  be  the  full  width  of  the  embankment, 

without  depressions  between  slopes,  built  to  the  true  slope,  and  not  widened  with  loose 
material  from  the  top.  The  most  suitable  material  shall  be  reserved  for  finishing  the 

surface.  Large  stones  shall  not  be  permitted  within  a  depth  of   

( )  feet  below  subgrade. 

Proposed  Form 

33.  Formation  in  Layers 

Unless  otherwise  directed,  embankments  of  earth  shall  be  built  in  horizontal  layers 
of  not  more  than  twelve  inches  in  thickness.  Where  the  layers  are  to  be  rolled,  their 

thickness  shall  not  exceed ( )  inches  and  they  shall,  if  directed, 

be  harrowed  with  a  spring  tooth  or'  disc  harrow.  The  layers  must  be  the  full  width  of 
the  embankment,  without  depressions  between  slopes,  built  to  true  slope  and  not 
widened  with  loose  material  from  the  top.  Layers  shall  be  compacted  as  evenly  and  as 
densely  as  possible  by  distributing  the  hauling  over  the  entire  area  of  fill  already  placed. 
The  most  suitable  material  shall  be  reserved  for  finishing  the  surface.  Large  stones  shall 
not  be  permitted  within  a  depth  of  ( )  feet  below  subgrade. 

Present  Form 

34.  Rolling 

When  directed,  embankments  placed  in  layers  shall  be  thoroughly  compacted  by 
rolling  each  layer  with  a  roller  weighing  not  less  than    ( ) 


Roadway    and    Ballast 565 

pounds  per  lineal  inch.  Additional  payment  for  stick  compaction  shall  be  made  by  the 
cubic  yard,  measured  in  excavation. 

Proposed  Form 
34.  Moisture  Content,  Rolling 

If  the  moisture  content  of  material  used  for  filling  is  insufficient  to  permit  com- 
paction to  the  density  required  by  the  Company,  the  Contractor  shall  furnish  water 
and  apply  it  to  the  fill  by  suitable  means  of  distribution  and  in  the  amount  directed, 
and  shall  mix  it  with  the  soil  by  harrowing.  Such  work  shall  be  paid  for  on  a  force 
account  basis,  unless  otherwise  provided  in  the  contract. 

Where  directed,  embankments  placed  in  layers  shall  be  thoroughly  compacted  by 
rolling  each  layer  with  a  self-propelled  roller  of  the  three-wheel  type  weighing  not  less 
than  300  pounds  per  linear  inch  of  width  of  the  rear  wheels,  or  with  a  tamping  roller 
weighing,  when  fully  loaded,  not  less  than  100  pounds  per  square  inch  of  tamping  area. 
Tamping  rollers  used  shall  have  tamping  feet  which  project  7  inches  or  more  from  the 
surface  of  the  roller  and  are  not  less  than  6  inches  apart,  and  shall  be  equipped  with  a 
cleaning  device.  Rolling  shall  continue  until  no  further  compaction  results,  unless  other- 
wise directed.  Payment  for  rolling  fills  shall  be  per  cubic  yard  of  material  rolled,  meas- 
ured in  excavation,  and  shall  be  in  addition  to  the  price  for  excavation. 

Where  the  material  in  an  embankment  is  to  be  rolled,  the  natural  soil  on  which  the 

embankment  will  rest  shall  be  plowed  to  a  depth  of ( )  inches 

and  sprinkled,  harrowed  and  rolled  in  the  same  manner  as  the  embankment.  Payment 
for  furnishing  and  applying  water  shall  be  on  a  force  account  basis,  unless  otherwise 
provided  in  the  contract;  and  for  plowing,  harrowing  and  rolling  shall  be  on  a  square 
yard  basis. 


Report  on  Assignment  7 
Tunnels — Lighting 

W.  S.  Moore  (chairman,  subcommittee),  F.  W.  Alexander,  H.  F.  Brown,  F.  W.  Hillman, 
G.  B.  Wall,  Jr. 

Your  committee  reported  on  this  subject  at  the  1940  convention,  which  report  was 
offered  as  information  in  the  Proceedings. 

Further  investigation  has  convinced  the  committee  that  the  best  lighting  possible  in 
tunnels  is  none  too  good.  Track  must  be  maintained  to  a  higher  standard  there  than 
anywhere  else  due  to  the  limited  clearances  frequently  found  in  older  tunnels.  Ample 
Ughts  are  also  necessary  for  proper  inspection  of  tunnel  lining,  and  drainage  conditions 
frequently  require  serious  attention.  Good  lighting  will  increase  the  efficiency  of  the 
workmen  and  reduce  the  hazard  of  personal  injuries. 

Ordinary  hand  lanterns,  banjo  torches  and  carbide  lights  give  insufficient  light  or 
are  too  low  to  do  much  good  and  some  of  them  create  objectionable  fumes  and  smoke. 
They  are  expensive,  as  it  is  often  necessary  to  assign  some  of  the  workmen  to  hold 
them  up  or  move  them  frequently. 

Of  the  941  tunnels  on  which  the  committee  obtained  information  last  year,  less 
than  7  percent  have  any  form  of  permanent  electric  wiring  for  lights,  either  in  conduit 
or  in  cable  or  open  wiring.  Corrosion  and  the  maintenance  cost  of  this  type  of  con- 
struction are  excessive. 


566 Roadway    and    Ballast 

The  following  is  therefore  recommended  for  adoption  and  inclusion  in  the  Manual: 

704.  LIGHTING 

Portable  lighting  plants  with  gasoline  engine  driven  generators  producing  110- volt 
current  are  economical  and  satisfactory  for  lighting  tunnels.  These  may  be  secured  in 
units  that  deliver  as  low  as  650  watts  and  weigh  only  70  pounds.  These  portable  plants, 
placed  in  track  ditches  or  along  tunnel  walls  will  easily  clear  passing  trains.  Lights  used 
with  them  may  be  mounted  on  adjustable  tripods  which  can  be  raised  or  lowered,  or  on 
wooden  rods  about  6  feet  long,  with  pointed  steel  shoes  so  that  they  may  be  set  up  in 
the  track  above  the  workmen. 

Two  300-watt  flood  lights  with  suitable  extension  cords  plugged  into  the  portable 
plants  will  produce  ample  illumination  for  all  ordinary  tunnel  work. 


Report  on  Assignment  8  (a) 

Corrosion-Resisting  Fence  Wire 

Collaborating  with  Appropriate  Subcommittees  of  Committee  A-5  on 
Corrosion  of  Iron  and  Steel,  ASTM 

A.  R.  Jones  (chairman,  subcommittee),  F.  W.  Hillman,  P.  J.  McCarthy,  W.  C.  Pruett, 
P.  H.  Winchester. 

Your  committee  is  collaborating  with  and  receiving  reports  of  the  exposure  tests  of 
farm  field  fence,  unfabricated  wire,  wire  strand,  barbed  wire  and  chain  link  fencing  of 
ASTM  Committee  A-S  on  Corrosion  of  Iron  and  Steel.  The  first  report  of  the  Wire 
Inspection  Committee  on  Field  Tests,  published  in  the  ASTM  Proceedings  for  1939, 
Vol.  42,  page  156,  indicated  the  following  trends: 

Ordinary  zinc  coated  wires  do  not  show  significant  losses  of  strength  until 
after  rusting  of  base  metal  has  started. 

Heaviest  corrosion  is  in  severe  industrial  atmosphere,  next  in  sea  coast  ex- 
posure, next  in  moderate  industrial  atmosphere  and  least  in  rural  exposures. 

Copper-bearing  uncoated  wires,  copper  content  0.22  percent  to  0.25  percent, 
are  corroding  less  rapidly  than  the  low  copper  content,  0.05  percent  to  0.08  per- 
cent, where  exposed  to  severe  industrial  atmosphere. 

Thus  far  there  is  no  clear  cut  indication  that  the  lighter  gage  uncoated  wires 
are  being  penetrated  more  rapidly  than  the  heavy  uncoated  wires. 

There  is  a  tendency  for  the  wires  of  lighter  gages  to  lose  coating  somewhat 
faster  than  the  wires  in  heavier  gages. 


This  report  is  presented  as  information. 


Roadway    and    Ballast 


567 


Report  on  Assignment  8  (b) 
Wood  Fence  Posts,  Specifications,  Etc. 

A.  R.  Jones  (chairman,  subcommittee),  F.  W.  Hillman,  P.  J.  McCarthy,  W.  C.  Pruett, 
P.  H.  Winchester. 

Your  committee  has  collected  a  number  of  specifications  for  wood  fence  posts  now 
in  use,  and  after  a  thorough  study  of  these,  offers  the  following  specifications  as  informa- 
tion and  invites  comments  and  criticisms  prior  to  offering  them  for  inclusion  in  the 
Manual  at  the  1942  convention. 

SPECIFICATIONS  FOR  WOOD  FENCE  POSTS 

...    ,       r  rx,      ,  MATERIAL 

1.  Kinds  of  Wood 

Before  manufacturing  posts,  producers  shall  ascertain  which  of  the  following  kinds 
of  wood  suitable  for  fence  posts  will  be  accepted. 

Class  U  designates  the  kinds  of  wood  that  may  be  used  untreated  and  Class  T 
designates  the  kinds  of  wood  which  should  receive  preservative  treatment. 


Class  U 


Black  Locust 

Cypress 

Catalpa 

Cedar 

Chestnut 

Douglas  Fir 


u 

Class  T 

Black  Walnut 

Ashes 

Hackberries 

Heart  Yellow  Pine 

Beech 

Maple 

Larches 

Birch 

Red  Oak 

Red  Mulberry 

Black   Gum 

Sap  Yellow  Pine 

Redwood 

Cherry 

Sycamores 

White  Oak 

Elm 
Hickories 

Sap  Fir 

_   ,         ^  PHYSICAL  REQUIREMENTS 

2.  Defects* 

Posts  shall  be  free  from  the  following  defects:  Decay,  excessive  crook,  wane  on  rec- 
tangular posts,  holes  in  top  of  post,  numerous  holes,  large  knots,  large  shakes  and  splits. 

3.  Defects  Allowable* 

In  round  cedar  posts,  pipe  or  stump  rot  up  to  0.75  inches  in  diameter  in  butt  end. 

Peck  in  cypress  up  to  limitation  of  holes. 

Crook  that  does  not  exceed  3  inches  measured  between  the  longitudinal  axis  and  a 
straight  line  from  the  center  of  one  end  to  the  center  of  the  other  end. 

Wane  on  rectangular  posts  not  exceeding  one-fourth  of  the  dimension  of  the  faces. 

Holes  other  than  in  top  of  post  not  exceeding  1  inch  diameter  and  3  inches  deep. 

Numerous  holes  that  are  not  damaging  in  effect. 

Knots  in  round  posts  whose  average  diameter  is  less  than  one-third  the  diameter 
of  post. 

Knots  in  rectangular  posts  whose  average  diameter  is  less  than  0.25  the  width  of 
surface  in  which  the  knot  appears. 

Numerous  knots  that  are  not  damaging  in  effect. 

Large  shakes  in  rectangular  posts  whose  maximum  dimension  between  parallel  lines 
does  not  exceed  0.25  of  the  minimum  thickness  of  post. 

In  round  posts  shakes  not  damaging  in  effect. 

Splits  not  damaging  in  effect. 


*  For   definition   of   terms   please   see    "Definitions   of    Maximum    Defects   and    Blemishes"    Manual 
page  7-74. 


568 Roadway    and    Ballast 

DESIGN 

4.  General 

Before  manufacturing  posts,  producers  shall  ascertain  which  sizes  will  be  acceptable 
and  whether  posts  are  to  be  round,  rectangular,  halved  or  quartered. 

5.  Dimensions 

All  posts  shall  be  in  accordance  with  the  designs  and  dimensions  shown  in  the  table. 

Design  and  Dimensions  of  Fence  Posts 

Design  Dimensions 

Intermediate  End,  Corner,  Anchor 

or  Line  Posts  and  Gate  Posts 

At  Small  End     Length      At  Small  End     Length 

Round 4  in.  diameter       7  ft.       8  in.  diameter      8  ft. 

5  in.  diameter       8  ft. 

Rectangular   4  in.  by  4  in.        7  ft.       8  in.  by  8  in.       8  ft. 

5  in.  by  S  in.        8  ft. 

Halved ]  9  in.  perimeter      7  ft. 

21  in.  perimeter      8  ft. 

Quartered    19  in.  perimeter      7  ft. 

21  in.  perimeter      8  ft. 

MANUFACTURE 

6.  General  Requirements 

All  posts  shall  be  straight,  well  manufactured,  of  natural  taper,  free  from  projections 
and  cut  square  at  ends  unless  small  end  is  roofed.  Inner  skin  must  be  removed  and 
roofing  or  gaining  of  treated  posts  shall  be  done  before  treatment. 

INSPECTION 

7.  Place 

Posts  shall  be  inspected  at  points  of  shipment  or  destination,  in  suitable  and  con- 
venient places  satisfactory  to  the  railroad.  Posts  will  be  inspected  at  points  other  than 
the  railroad  property  whenever  in  the  judgment  of  the  railroad  there  is  sufficient  number 
to  warrant  it;  but  the  shipper  shall  provide  accommodations  for  the  inspector  at  the 
expense  of  the  railroad,  while  away  from  rail  or  steamship  lines,  and  transport  him  from 
and  to  a  railroad  station  or  steamer  landing. 

8.  Manner 

Inspectors  will  make  a  reasonably  close  inspection  of  each  post,  which  shall  be 
judged  independently,  without  regard  for  decisions  on  others  in  the  same  lot.  Posts  too 
soiled  for  ready  examination  will  be  rejected.  Posts  shall  be  turned  over  as  inspected. 

WORKMANSHIP 

9.  Tolerances 

Posts  shall  not  be  more  than  1  inch  shorter  nor  3  inches  longer  than  the  lengths 
specified. 

Posts  shall  not  be  more  than  %  inch  smaller  nor  more  than  1  inch  larger  than  the 
diameters,  widths  and  perimeters  specified. 


Roadway    and    Ballast 569 

DELIVERY 

10.  Separated  as  Specified 

Posts  shall  be  separated  according  to  the  kind  of  wood,  shape  and  size  or  as  may 
be  required  in  the  order  for  them. 

PRESERVATIVE  TREATMENT 

11.  Specifications 

Posts  requiring  treatment  shall  be  treated  in  accordance  with  the  AREA  Specifica- 
tions for  the  Preservative  Treatment  of  Wood. 


Report  on  Assignment  8  (c) 

Electrified  Fences 

Collaborating  with  Committee  3 — Overhead  Transmission  Line 

and  Catenary  Construction  of  the  Electrical  Section, 

Engineering  Division,  AAR 

A.  R.  Jones  (chairman,  subcommittee),  F.  W.  Hillman,  P.  J.  McCarthy,  W.  C.  Pruett, 
P.  H.  Winchester. 

Modern  effective  electric  fences  are  usually  single  strand  barbed  wires  that  are 
supported  on  insulators  and  so  supplied  with  electricity  that  any  animal  touching  them 
will  receive  a  shock  strong  enough  to  turn  the  animal,  but  the  shock  must  not  be  strong 
enough  to  be  dangerous.  As  there  is  usually  only  one  strand  of  wire  supported  on  Ught 
posts  spaced  3  rods  apart  and  as  the  pull  of  the  fence  is  not  excessive  so  that  end  post 
bracing  is  simple,  electric  fences  cost  very  Uttle  in  materials  or  labor  as  compared  with 
woven  wire  or  regular  barbed  wire  fences. 

Electricity  is  regulated  and  supphed  to  electric  fences  through  devices  known  as 
electric  fence  controllers  which  may  operate  on  (1)  battery  current  only,  or  on  (2) 
central  station  alternating  current  only,  or  (3)  either  on  battery  current,  or  on  alternat- 
ing current  that  is  so  modified  in  the  controller  as  to  be  a  substitute  for  battery  current. 

An  alternating  current  of  25  milliamperes  is  considered  the  amount  of  current  nec- 
essary to  flow  from  the  fence  through  the  animal  if  all  the  perverse  animals  in  a  herd 
are  to  be  turned  from  the  fence  with  reasonable  certainty.  Such  current  is  effective  if  it 
comes  from  the  fence  in  brief  shocks  with  an  interval  between  of  sufficient  duration  to 
allow  an  animal  to  release  itself  from  the  fence.  Off  periods  of  at  least  0.9  second  and 
shock  periods  of  not  over  0.1  second,  coming  not  more  frequently  than  once  a  second 
are  generally  considered  standard  for  alternating  current  controllers.  Such  controllers 
are  required  to  be  made  so  that  there  is  no  reasonable  probability  that  the  interrupting 
mechanism  will  fail  to  function  or  that  the  insulation  will  break  down  and  connect  the 
power  line  directly  to  the  fence. 

There  are  now  three  codes  or  sets  of  rules  setting  forth  how  electric  fences  may 
operate  and  how  they  should  be  constructed  for  safety.  The  code  first  issued  is  that  of 
the  Industrial  Commission  of  Wisconsin,  the  second  the  Electric  Fence  section  of  the 
National  Electric  Safety  Code  which  is  sponsored  by  the  U.  S.  Bureau  of  Standards;  the 
third  is  the  Standard  for  Electric  Fence  Controllers  by  Underwriters  Laboratories  Inc. 
sponsored  by  the  National  Board  of  Fire  Underwriters. 


570 Roadway    and    Ballast 

The  following  are  quotations  in  part  from  General  Orders  on  Electric  Fences  dated 
October  6,  1938  and  issued  and  published  by  the  Industrial  Commission  of  Wisconsin. 

An  electric  fence  is  a  barrier  to  animals  or  fowls  consisting  of  an  electrified 
conductor  and  an  energizing  and  controlling  device. 

An  electrified  conductor  may  be  wire,  ribbon,  tape,  rod,  tube,  plate,  mesh  or 
any  other  form  suitable  for  its  purpose,  but  may  be  referred  to  simply  as  fence 
wire. 

The  energizing  and  controlling  device  is  the  device  or  combination  of  devices 
by  which  the  fence  is  electrified  and  may  be  referred  to  simply  as  the  controller. 

A  battery  controller  is  one  for  which  the  power  source  is  a  battery  or  batteries 
limited  to  less  than  IS  volts. 

An  alternating  current  controller  is  one  for  which  the  power  source  is  alter- 
nating current  at  voltages  normally  supplied  by  electric  distributing  agencies. 

All  controllers  and  converters  which  are  sold  or  installed  in  Wisconsin  after 
October  6,  1938  shall  comply  with  the  requirements  of  these  orders  and  be 
approved  by  the  Industrial  Commission  of  Wisconsin. 

Controllers  supplied  by  a  primary  source  of  power  in  excess  of  IS  volts  and 
which  do  not  provide  separation  by  insulation  between  the  primary  source  of 
electric  energy  and  the  fence,  and  those  of  the  continuous  vibration  type  delivering 
more  than  S  miliamperes  Y.M.S.  or  2S  miliamperes  peak  shall  be  prohibited  after 
October  6,  1938. 

Electric  fences,  when  installed  along  public  highways,  or  as  property  line 
fence,  shall  be  identified  by  approved  signs  clamped  to  the  wire  or  fastened  to 
the  posts  at  intervals  of  not  more  than  200  feet. 

Electric  fences  are  increasing  in  use  for  farm  fencing.  Their  application  to  the 
right-of-way  would  require  determination  in  each  state  as  to  meeting  requirements  for 
legal  right-of-way  fence.  Policing  is  necessary  to  keep  vegetation  cleared  as  a  possible 
cause  of  short  circuits.  This  type  of  fencing  along  the  right-of-way  would  lend  itself  to 
claims  for  injury  to  persons  and  to  stock. 

The  committee  is  of  the  opinion  that  the  electric  fence  is  not  suitable  for  general 
use  as  a  right-of-way  fence. 


The  report  is  presented  as  information. 


Report  on  Assignment  9  (a) 
Design  o£  Signs 

L.  J.  Drumeller  (chairman,  subcommittee),  Clifton  Brannon,  G.  H.  Burnette,  F.  L.  Guy, 
O.  N.  Lackey,  A.  H.  Woerner. 

For  the  purpose  of  developing  information  regarding  current  practice  in  the  design 
of  signs,  a  questionnaire  was  sent  to  28  representative  railroads  in  the  United  States  and 
Canada  having  a  total  of  191,768  miles  of  road.  From  the  data  received  in  the  rephes, 
your  committee  has  prepared  the  tabulation  appearing  on  the  folded  insert,  which  shows 
the  materials  of  construction  and  the  dimensions  of  the  various  types  of  signs  used  on 
these  railroads  for  the  purposes  indicated  in  Manual  pages  1-87  and  1-88  under  the 
heading  "901.  Roadway  Signs  Required." 


KIQHWAVMB  I 


VARD         %   APPRMCHTO   6  IjUNCTION  I  E  llNFUIMUlf  I  -  .        ,.,^, 

II    LIMIT        g   DMWWBSt  I    «HISrrLE_  ^     STOR«_  i   rnrifir»ri  i     VOlT«a 

u.t,  R  rn  =   a.  r.  f,  c'dT  a  abTT)';.  S  a  bXdT  g  *»'c"d'e  " 


BALLAST    SECTION      NO.  3-A    CURVES 

=  REPAREO   GRAVEL    0-20%  CRUSHED    PARTICLES    AND     PIT    RUN      GRAVEL 


TABLE  OF   VARIABLES 

AND 

QUANTITIES    PER    100  FEET    SINGLE    TRACK- 

FOR   SECTION 

3-A    CURVES 

SECTON 

« 

A 

SUPERELEVATION                                                                                                   I 

1" 

2  , 

3 

4- 

5- 

6- 

X-L        "' 

X-H 

Cu.Yds. 

X-L 

X-H 

UJ.YD5, 

X-L 

X-H 

UiYds, 

X-L 

X-H 

CuYds. 

X-L 

X-H  [Cu.Yns.iX-L   X-H  ICuyos. 

3-A  a-ta 

16" 

6-8" 

7-  r 

104 

6'-7- 

7-10" 

108 

6-6" 

8-2" 

113 

6-5' 

8-5" 

116 

6-  4" 

8-9'         120       6-3'     9-0"       123 

3-A  cde-f 

14" 

6-3' 

7-2' 

92 

6-2' 

7-5" 

95 

6-  1" 

7-  9" 

100 

6-0- 

8-0" 

104 

5'-||' 

8-4" 

108       5-10"     8-7-        112      ; 

3-A    g-i 

12 

5-10 

6-9" 

78 

5-9- 

7-0" 

81 

5-8- 

7-4" 

86 

5'-  7" 

7-7- 

89 

5-6- 

7-ir 

93 

5-5'     8-2'         98 

3-A  h-i-kn 

10" 

5'  S" 

6-4" 

68 

5-4- 

6-7" 

7.1 

5-3- 

6-11" 

74 

S-  2" 

7-2" 

77 

5-  r 

7-6" 

8  1 

5-0-i   7'-9"         85 

3-A    1-0 

8- 

5-0" 

5-1  r 

55 

4-11' 

6-2- 

59 

4-10- 

6'-6- 

62 

4-9" 

6-9 

66 

4-8" 

7-1 

69 

4-7'  j   7-4-         73 

3-A   m-p 

« 

4-  7" 

5-6" 

44 

4-6" 

5^9" 

47 

4-5" 

6-  1' 

51 

4-4" 

6^" 

53 

4-3" 

6-8- 

57 

4-2' 1   6-l|-|      60 

TABLE   OF    VARIABLES    AND    QUANTITIES    PER    100   FEET    SINGLE   TRACK -FOR    SECTION    4-A    CURVES 


«*^^  BALLAST      SECTION        NO.  4-A    CURVES 

materials:      prepared     GRAVEL    0-20%  CRUSHED     PARTICLES     AND      PIT     RUN     GRAVEL 


NOTES 

L     OCPTH     OF    SECTION    TO    USE     WILL     DEPEND    ON    CONDITIONS      PECULIAR      TO     EACH     RAILROAD     OR       LOCATION. 

2.  UNOCR     CERTAIN      CONDITIONS      IT      MAY      BE     NECESSARY     TO     USE     A    DEPTH      IN    EXCESS    OF     MAXIMUM       SHOWN      IN     TABLES. 

3.  ROADBED     TO     BE    WIDENED    ON     HIGH     SIDE     WHEN     NECESSARY     TO     PROVIDE     MINIMUM        OF     IS    INCHES      FOR     Y. 

4.  QyANTITIES     COMPUTED    ON      BASIS    OF      3200    TIES     PER     MILE      AND      \i,%    ALLOWANCE     FOR       SHRINKAGE. 

5.  VARIABLES     AND     QUANTITIES    FOR      SUPERELEVATION     UP     TO   3    INCHES     ARE    SHOWN     AS      INFORMATION. 


SECTION 

• 

A 

SUPERELEVATION 

1"               1               2" 

3" 

4" 

5"                            6" 

X-L 

X-H 

CuYdsIX-L 

X-H 

Cu.>bs 

X-L 

X-H 

Cu.Yds 

X-L 

X-H 

CuYds 

X-L   X-H  Cu.Yds  X-L    X-H  CuYbs 

4-A  a 

24" 

9-0" 

10-0" 

170 

8-11" 

10-3" 

173 

8-10" 

10-7" 

178      |8-9" 

10-11" 

184     1 

8-8- 

11-3"        190        8-7      11-7"        196 

•4-A    b 

22" 

8-7" 

9-6" 

155 

8-6" 

9-10 

159 

8-  5" 

10-2 

163 

8-4' 

10-6" 

169 

8-3" 

10-10''      173     1   8-  1"  ,  11-2'       178      , 

4-A    C 

20- 

8-  1" 

9-0" 

139 

8-0 

9-4 

143 

7-11" 

9-8" 

147 

7-10' 

10-0' 

151 

7-9' 

10-4" 

157        7-8'    10-8"       162 

4-A    d-e 

18" 

7-8 

8-7" 

123 

7-7" 

8-11" 

127 

7-6" 

9-3" 

133 

7-4" 

9-7" 

136 

7-3'  i    9-10' 

140     \   7-2"  1  10-2"       146 

4-A    f 

16" 

7-2" 

8-  1" 

109 

r-\" 

8-  5" 

112 

7-0" 

8-9" 

116 

6-11" 

9-  1" 

121 

6-10"     9-5 

125       6-9"     9-9'        130 

4-A    q-h 

14" 

6-9- 

7^8" 

96 

6-8" 

8-0 

100 

6-6" 

8-3" 

102 

6-5" 

8-  7" 

106     1   6-4       8-11"        111         6-3       9-3         115      I 

4-A     i 

12" 

6-3'  i    7-2' 

81 

6-2" 

7-6 

85 

6-0" 

7-IO° 

89 

5-11" 

8-2' 

93 

5-10       8-6' 

97     ,   5-9"     8-10"         101      1 

4-A    j-k 

10" 

5-9-      6-8" 

69 

5-8" 

7-0 

72 

5-7" 

7-4" 

76 

5-6" 

7-8" 

81 

5-5" 

8-0" 

84 

5-4       8-4-         88 

4-A     1 

8" 

5-4       6-3 

57 

5-3" 

6'-7' 

60 

5-2" 

6-11- 

64 

5-1" 

7-3' 

68 

4-11  " 

7'-7' 

72 

4'-IO',   7'-ia'       75 

4-A    m 

6- 

4-10' 

5-9- 

47 

4-9" 

6-  1" 

51 

4-  8" 

6-5" 

54 

4-7" 

6-9" 

57 

4-6" 

7-1" 

59 

4-S- 

7-5"        63 

1 

\ i 

*  SUB-LETTERS    GIVEN    IN     SECTION     COLUMN     INDICATE      CORRESPONDING 
SECTIONS    FOR     TANGENT    TRACK-    SEE     MANUAL,   PAGE  2-18. 


A.R.E.A. 

BALLAST       SECTIONS 
SINGLE    AND    MULTIPLE    TRACK-CURVES 

(FOR    SUPERELEVATION      IN     EXCESS    OF    3   INCHES) 


Roadway    and    Ballast 571 

In  view  of  the  great  diversity  of  signs  now  in  use,  as  disclosed  by  this  tabulation, 
your  committee  is  of  the  opinion  that  the  development  of  recommended  designs  of  signs 
for  these  various  purposes  is  not  practical.  For  example,  of  the  28  roads  canvassed, 
there  are  10,  each  of  which  uses  a  different  shape  for  the  speed  control  sign. 

In  the  opinion  of  the  committee,  individual  railroads  should  give  consideration  to 
the  economies  to  be  effected  by  a  reduction  in  the  number  of  shapes  of  signs,  so  that  a 
sign  for  one  purpose  could  be  used  for  another  simply  by  changing  the  legend.  For 
example,  a  "No  Trespass"  sign,  which  has  been  eliminated  at  one  point  could  be  reused 
at  some  other  location  as  a  "City  Limit",  "County  Line",  "State  Line",  or  other  sign,  by 
having  it  relettered.  However,  it  is  desirable  that  the  signs  for  the  various  purposes 
listed  under  Item  "D.  Transportation"  on  Manual  page  1-88  should  each  have  a  dis- 
tinctive shape  that  can  be  easily  recognized  at  a  distance,  so  that  appropriate  action 
thereon  is  not  dependent  upon  an  ability  to  read  the  legend. 

The  tabulation  prepared  from  information  in  the  replies  to  the  questionnaire  is  pre- 
sented not  only  for  the  purpose  of  showing  the  various  types  and  shapes  of  signs  actually 
in  use  on  the  railways  canvassed,  but  also  with  the  thought  that  it  would  be  found  useful 
in  the  design  of  signs  on  various  roads  to  the  end  that  there  may  eventually  be  some 
semblance  of  uniformity  in  the  shape  and  dimensions  of  each  kind  of  roadway  sign. 


This  report  is  offered  as  information. 


Report  on  Assignment  10  (a) 

Ballast  Section  Design 

A.  D.  Kennedy  (chairman,  subcommittee),  A.  P.  Crosley,  R.  L.  Dyke,  F.  L.  Guy,  T.  P. 
Poison,  G.  B.  Wall,  Jr. 

The  committee  has  prepared  two  ballast  section  plans  designed  for  curves:  Section 
No.  3a — Curves  and  No.  4a — Curves,  for  prepared  gravel,  under  20  percent  crushed 
particles  and  for  pit  run  gravel. 

These  sections  are  recommended  for  superelevations  in  excess  of  three  inches,  and 
are  presented  for  adoption  and  inclusion  in  the  Manual. 


Report  on  Assignment  10  (c) 
Investigate  the  Use  of  Asphalt  in  Ballast 

J.  M.  Podmore  (chairman,  subcommittee),  J.  A.  Given,  P.  J.  McCarthy,  J.  A.  Noble, 
Stanton  Walker,  C.  S.  Wicker. 

In  the  early  fall  of  1939  a  test  section  of  emulsified  asphalt  coated  stone  ballast 
track  was  completed  at  Bryan,  Ohio.  This  test  section  is  600  ft.  long  and  is  located  on 
tangent  in  the  east  bound  high  speed  track  at  the  station  platform.  A  complete  account 
of  the  method  of  constructing  this  test  section  of  track,  the  amount  and  kind  of  material 
used,  and  the  force  employed  was  given  by  your  committee  in  its  report  to  the  last 
convention.  Proceedings  for  1940,  Vol.  41,  page  545. 


572 Roadway   and   Ballast 

After  the  completion  of  the  test  section,  no  work  was  done  and  no  expense  incurred 
until  minor  repairs  were  made  on  August  16,  17  and  18,  1940.  At  that  time  a  foreman 
and  three  laborers  worked  2^^  days,  or  20  hours  each;  a  total  of  80  hours.  The  work 
performed  consisted  of  removing  between  five  and  six  wheelbarrows  of  dirt,  cinders, 
sand,  coal  and  other  foreign  material  from  the  top  of  the  asphalt  ballasted  track  and  the 
ties. 

It  was  found  that  the  asphalt  seal  coat  was  shattered  in  a  few  places  between  the 
ties,  and  this  was  removed  and  replaced  with  new  material.  There  was  some  creeping  of 
track  that  was  causing  the  bond  between  the  edges  of  the  ties  and  the  seal  coat  to  open 
and  show  cracks.  These  cracks  were  filled  with  a  mixture  of  sand  and  asphalt.  There  was 
one  joint  low,  which  was  dug  out  and  retamped  after  which  the  carpet  coat  was  replaced. 
The  work  described  above  required  13^  cu.  yd.  of  sand  and  330  gal.  of  asphalt. 

The  track  is  in  good  line  and  surface  and  has  maintained  this  condition  since  it  was 
installed.  The  water  sheds  off  quickly  after  a  storm  and  there  is  no  foul  or  muddy  track. 

As  it  will  require  more  time  to  determine  the  merits  of  this  experiment,  this  report 
is  submitted  as  one  of  progress,  with  the  suggestion  that  a  further  report  be  made  on  the 
service  behavior  of  this  test  at  some  later  date. 


Report  on  Assignment  10  (d) 
Adherence  to  Stone  Ballast  Specifications,  Particularly  Size 

A.  D.  Kennedy  (chairman,  subcommittee),  A.  P.  Crosley,  R.  L.  Dyke,  F.  L.  Guy,  T.  P. 
Poison,  G.  B.  Wall,  Jr. 

For  the  purpose  of  obtaining  information  on  the  extent  of  the  use  of  the  stone  ballast 
specifications,  the  following  questionnaire  was  addressed  to  the  chief  maintenance  officers 
of  the  principal  railroads  on  June  12,  1940: 


Attention  Chief  Maintenance  Officers: 

One  of  the  subjects  assigned  to  the  Roadway  and  Ballast  committee  of  the 
AREA  for  this  year  is  to  determine  the  extent  of  adherence  on  the  part  of  the 
various  railroads  to  the  AREA  stone  specifications,  particularly  size. 

The  sizes  of  stone  now  specified  are  as  follows: 

Normal  Size,  Approximate 

Square  Size,  Round 
Designation                                                             Opening  Opening 

2-A    1"  to  2"  114"  to  21/^'" 

3-A    ^'"  to  1"  y&"  to  IYa" 

3-B    y^"  to  IJ^"  %"  to  1^" 

23-B    y^"  to  lYi"  Yb,"  to  3" 

Will  you  please  indicate  to  what  extent  the  above  gradations  are  followed 
by  your  road  in  purchasing  ballast  from  commercial  plants. 

Further  in  this  same  direction,  since  the  advent  of  higher  speed  schedules, 
which  call  for  more  exactness  in  surfacing  track,  the  trend  is  toward  the  use  of 
smaller  sized  ballast,  especially  for  spot  work;  some  roads  are  using  ballast  not  to 
exceed  one  inch  in  size. 


Roadway    and    Ballast 


573 


In  view  of  the  foregoing,  do  you  think  the  AREA  ballast  specifications  should 
provide  a  ballast  gradation  smaller  than  now  shown?  If  so,  please  indicate  your 
preference  for  any  of  the  following  designations,  which  are  included  in  the  latest 
recommendations  of  the  National  Bureau  of  Standards: 

Normal  Size,  Approximate 

Square  Size,  Round 
Designation                                                             Opening  Opening 

57     l"-No.  4  1^"-]^" 

6  Va"-%"  V^'-V^" 

67    ^"-No.  4  Vi-VA." 


In  response  to  the  foregoing  questionnaire,  replies  were  received  from  35  railroads, 
representing  214,000  route  miles  in  Canada  and  the  United  States.  A  compilation  of  the 
data  furnished  indicates  that  77  percent  of  the  roads  use  crushed  stone  for  ballast  and 
23  percent  use  gravel  or  special  materials.  The  replies  show  that  of  the  roads  using 
crushed  stone,  S3  percent  adhere  to  the  present  AREA  specifications  in  so  far  as  gradation 
is  concerned,  and  60  percent  of  the  replies  indicate  that  a  smaller  size  gradation  than 
now  specified  should  be  added,  a  decided  preference  being  shown  for  Bureau  of 
Standards  gradation  No.  57. 

The  table  of  gradation  now  appearing  in  Section  301  of  the  specifications  conforms 
with  the  Bureau  of  Standards  Simplified  Practice  Recommendation  R  163-36  issued  in 
1936.  However,  the  bureau's  recommendation  R  163-39  issued  in  1939  supersedes 
R  163-36,  and  embraces  changes  in  gradations  and  in  the  designating  numbers.  The 
revised  recommendation  R  163-39  has  been  accepted  by  a  majority  of  producers  and 
users  of  coarse  aggregates  and  ballast. 

The  table  of  gradation  now  in  the  Manual,  which  conforms  to  Bureau  of  Standards 
recommendation  R  163-36,  is  given  in  Table  1,  while  the  gradation  conforming  with  the 
bureau's  recommendation  R  163-39  is  given  in  Table  2: 


T^ommal 

Size, 
Square 
Designation  Openings 

2A    1-2     " 

3A    yi-i     " 

3B  H-iyi" 

23B    i'l-i'A" 


Table  1.  Present  Form 

Approximate  Amounts  Finer  than  Each  Sieve  (Square  Opening) 

Size,  Round  Percents  by  Weight 

Openings  3"       IVi"  2"  V/i"  1"  J4" 

VA-iVi" 100        90-100       35-70        0-15  0-5 

ii-lH" ...  100         90-100  

Yi-lYi" 100  90-100     20-SS  0-15 

H-i     " 100    90-100       ...  25-60         ...  0-10 


cnis 


Size 

No. 

24 

3 

4 

S 

57 


Nominal 

Size, 

Square 

Opening 

2Vi"-  Va" 
2     "_i     « 

1/2"-  ^" 

1    "-  W' 
1     "-No.  4 


Approximate 

Size, 

Round 

Opening 

3     "-  %" 

2H"-i'A" 

m"-  Vs" 

VA"'-"%" 


3" 
100 


Table  2.  Proposed  Form 

Amounts  Finer  than  Each  Sieve  (Squarei.  Opening  Laboratory  Sieve) 
Percents  by  Weight  No. 

4 


2 'A" 

90-100 

100 


2" 


95-100 
100 


1/2" 
25-60 
35-70 
90-100 

100 

100 


1" 

6-15 
20-55 
90-100 


V4" 
0-10 


0-15 
40-75 


'A" 
0-5 
0-5 

i5-35 


H' 


0-5 
0-15 


90-100     2  5-60 


0-5 
0-10 


No. 


0-S 


Note:  Size  numbers  and  gradations  in  size  adopted  from  National  Bureau  of  Standards'  Simplified 
Practice  Recommendation  R  163-39. 


Aside  from  the  addition  of  Size  No.  57  in  Table  2,  the  major  differences  between 
Table  1  and  Table  2  are  in  the  arrangement,  and  that  the  tolerances  allowed  in  Table  1 
are  subjected  to  further  restrictions.  For  example,  size  3-B  in  Table  1  corresponds  with 


574 Roadway    and    Ballast 

size  No.  4  in  Table  2,  except  that  the  limit  of  IS  percent  placed  on  material  finer  than 
J^-in.  provided  in  Table  1,  has  been  replaced  by  the  requirement  that  only  5  percent  is 
permitted  to  pass  a  sieve  with  5^-in.  square  openings. 


Your  committee  recommends  that  the  gradation  table  now  in  the  Manual  under 
Section  301,  of  the  Specifications  for  Ballast  (shown  above  as  Table  1),  be  withdrawn 
and  replaced  with  gradation  Table  No.  2. 


Report  of  Committee   5 — Track 


W.  G.  Arn, 

J.  W.  Fulmer 

A.  E.  Perlman, 

Chairman, 

F.  S.  Hales 

Vice-Chairman, 

Lem  Adams 

H.  H.  Harman 

J.  B.  Myers 

L.  L.  Adams 

N.  M.  Hench 

G.  A.  Peabody 

C.  W.  Baldridge 

F.  W.  Hillman 

S.   H.   POORE 

A.  L.  Bartlett 

E.  T.  HowsoN 

J.  A.  Reed 

W.  H.  Bettis 

A.  F.  Huber 

0.  C.  Rehfuss 

W.  H.  B.  Bevan 

W.  G.  Hulbert 

C.  J.  RiST 

F.  J.  Bishop 

C.  T.  Jackson 

W.  L.  Roller 

L.  H.  Bond 

F.  J.  Jerome 

I.    H.    SCHRAM 

C.  W.  Breed 

A.  A.  Johnson 

J.  F.  Shaffer 

E.  W.  Caruthers 

J.  H.  Kelly 

G.  L.  Sitton 

Armstrong  Chinn 

J.  de  N.  Macomb 

G.  J.  Slibeck 

H.  R.  Clarke 

G.  M.  Magee 

G.  M.  Strachan 

0.  U.  Cook 

E.  E.  Martin 

C.  R.  Strattman 

E.    D.    COWLIN 

L.  I.  Martin 

Hermann  von  Schrenk 

H.  Q.  Day 

F.  H.  Masters 

H.  N.  West 

L.  W.  Deslauriers 

K.  R.  McLennan 

R.    P.   WiNTON 

J.  A.  Ellis 

R.  E.  Miller 

J.  G.  Wish  ART 

H.    F.    FiFIELD 

W.  A.  Murray 

M.  J.  T.  Zeeman 

Committee 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

1.  Revision  ot  Manual. 

Progress  report,  embracing  a  number  of  recommended  revisions   page  576 

For  other  revisions  see  Assignments  3,  4(a),  10,  12  and  13. 

2.  Fastenings  for  continuous  welded  rail,  collaborating  with  Committee  4 — Rail. 
Progress  report — -submitted  as  information   page  580 

3.  Plans  and  specifications  for  track  tools  and  recommended  Umits  of  wear,  col- 
laborating with  Committees  1 — Roadway  and  Ballast,  and  22 — Economics  of  Railway 
Labor. 

Progress  report,  including  recommendations  for  revision  of  the  Manual   .  .   page  584 
4   (a).  Plans  for  svdtches,  frogs,  crossings,  spring  and  slip  switches,  collaborating 

with  Signal  Section. 

Progress  report,  including  plans  submitted  for  adoption   page  595 

For  plans  previously  published  during  year,  see  Bulletin  418,  page  209,  and  Bulletin 

419,  page  139  and  Part  2  of  the  same  bulletin. 

4   (b).  Track    construction    in    paved    streets,    collaborating    with    Committee    9  — 

Highways. 

No  report. 

5.  Corrosion  of  rail  and  fastenings  in  tunnels,  collaborating  with  Committee  4 — Rail. 
Final  report — submitted  as  information   page  605 

6.  Design  of  tie  plates  for  RE  rail  sections  as  developed,  collaborating  with  Com- 
mittees 3 — Ties,  and  A — Rail. 

No  report. 

7.  Practicability  of  using  "reflex"  units  for  switch  lamps  and  targets,  collaborating 
with  Committee   10 — Signals  and  Interlocking. 

Progress  report — submitted  as  information   page  606 


Bulletin  423,  February,  1941. 


575 


576 Track 

8.  Welding   of  manganese  castings  in  special  trackwork,  collaborating  with   Com- 
mittee 27 — Maintenance  of  Way  Work  Equipment. 

No  report. 

9.  Bolt  tension  necessary  for  proper  supporting  of  rail  joints. 

Progress  report — submitted  as  information   page  608 

10.  Lubrication  of  rail  on  curves,  collaborating  with  Committee  16 — Economics  of 
Railway  Location  and  Operation. 

Progress  report  with  recommendation  for  inclusion  in  the  Manual   page  626 

11.  Prevention   of  damage   due   to   brine   drippings   on   track   and   structures,   col- 
laborating with  Mechanical  Division,  AAR. 

Progress  report — submitted  as  information   page  628 

12.  Specifications    for    laying    rails,    designed    to    set    up    requirements    for    good 
workmanship. 

Final   report — with   recommendation  for  inclusion  in   the  Manual    page  633 

13.  Spirals  for  high  speed  operation,  collaborating  with  Committee  16 — Economics 
of  Railway  Location  and  Operation. 

Final  report  with  final  recommendation  for  inclusion  in  the  Manual  ....  page  636 

The  Committee  on  Track, 

W.  G.  Arn,  Chairman. 


Report  on  Assignment  1 

Revision  of  Manual 

M.  J.  T.  Zeeman  (chairman,  subcommittee),  L.  L.  Adams,  W.  H.  B.  Bevan,  C.  W.  Breed, 
J.  A.  Ellis,  E.  T.  Howson,  A.  A.  Johnson,  J.  de  N.  Macomb,  J.  B.  Myers,  I.  H. 
Schram,  J.  G.  Wishart. 

The  committee  submits  the  following  revisions: 

Page  5-2 

Paragraph  401    (e).  Delete  this  sentence  and  in  lieu  thereof  insert  the  following: 
(e)  Tie  plates  shall  be  paid  for  on  the  basis  of  actual  weight  as  applied  to  the 

entire  order,  except  that  payment  shall  not  be  made  for  any  weight  in  excess  of  3 

percent  over  the  weight  calculated  from  the  specified  dimensions. 


The  reason  for  this  change  is  to  state  more  clearly  that  payments  are  made  on  the 
basis  of  actual  weights,  whether  under  or  over,  but  that  not  more  than  3  percent 
overweight  will  be  paid  for. 

Page  5-14.2 

Paragraph  401    (f).  Delete  this  sentence  and  in  lieu  thereof  insert  the  following: 
(f)  Tie  plates  shall  be  paid  for  on  the  basis  of  actual  weight  as  applied  to  the 

entire  order,  except  that  payment  shall  not  be  made  for  any  weight  in  excess  of  3 

percent  over  the  weight  calculated  from  the  specified  dimensions. 


The  reason  for  this  change  is  to  state  more  clearly  that  payments  are  made  on  the 
basis  of  actual  weights,  whether  under  or  over,  but  that  not  more  than  3  percent 
overweight  will  be  paid  for. 


Track 


577 


Fig.  509. 


Page  5-16.2 

Delete  the  drawing  on  this  page,  retaining  the  heading  "Design  of  Cut  Track  Spike," 
also  the  title  "For  Use  at  Rail  Joints  and  Alternate  Design  for  General  Use,"  and  insert 
the  new  design  of  spike,  to  be  identified  as  Fig.  509. 

The  reason  for  this  change  is  to  overcome  manufacturing  difficulties  encountered 
with  the  design  now  in  the  Manual.  While  the  specifications  on  page  5-16  permit  a 
variation  of  3/32  in.  over  and  1/32  in.  under  the  specified  dimensions  of  the  head  of 
the  spike,  some  objection  has  been  raised  when  all  of  this  over  tolerance  comes  at  the 
toe  of  the  spike  head,  which  makes  the  toe  distance  greater  than  9/16  in.  By  retaining 
the  specification  tolerances  and  reducing  the  head  width  and  length  from   iH  i"-  to 


578 


Track 


l-S/16  in.,  which  also  reduces  the  toe  distance  from  9/16  in.  to  J4  in.,  the  manufacturers 
will  be  able  to  produce  a  satisfactory  spike.  Fig.  509  shows  that  it  will  be  acceptable  if 
the  entire  permissible  head  tolerance  occurs  at  the  toe  of  the  spike  head. 

Page  5-34 

Under  "Speeds  of  Trains  Through  Level  Turnouts"  delete  the  text  and  the  table 
and  in  lieu  thereof  insert  the  following  text  and  two  tables,  retaining  the  present  heading: 

The  following  tables  show  speeds  through  level  turnouts  giving  riding  conditions 
equivalent  to  those  obtained  in  traversing  a  curve  elevated  3  inches  less  than  that 
required  for  equihbrium;  when  the  center  of  gravity  of  equipment  is  84  inches  above 
the  rail,  the  resultant  of  forces  will  intersect  the  plane  of  top  of  rail  approximately 
6  inches  outside  the  center  line  of  the  track. 

Speeds  through  turnouts  with  either  straight  or  curved  switch  points  are  calculated 
from  formula  £  =z  0.00066  D  Sr-Z,  (See  Manual  page  .5-42)  where  D  equals  the  degree 
of  curvature  of  the  closure  curve  or  the  switch  curve,  whichever  is  sharper;  for  turnouts 
with  straight  switch  points,  D  for  the  switch  point  curve  is  the  degree  of  curvature  of 
a  curve  having  a  central  angle  equal  to  the  switch  angle  and  a  chord  length  equal  to 
the  length  of  the  switch  points. 


Turnouts  With  Straight  Switch  Points  (AREA) 

Turnout  Length  of  Speed  In 
Number                                                                      Switch  Points      Miles  Per  Hour 

5    ll'-O"  12 

6    ll'-O"  14 

7    16'-6"  16 

8    16'-6"  19 

9    16'-6"  21 

10    16'-6"  21 

11     22'-0"  27 

12  ..' 22'-0"  28 

14    22'-0"  28 

15    30'-0"  37 

16    30'-0"  38 

18    30'-0"  38 

20    30'-0"  38 


Turnouts  With  Curved  Switch  Points   (AREA) 

Turnout  Length  of  Speed  In 
Number                                                                  Switch  Points      Miles  Per  Hour 

5    ll'-O"  12 

6    ll'-O"  14 

7    19'-6"  17 

8    19'-6"  20 

9    19'-6"  23 

10    19'-6"  2S 

11     19'-6"  2S 

12    30'-0"  30 

14    30'-0"  35 

15    30'-0"  39 

16    30'-0"  41 

18    39'-0"  46 

20    39'-0"  SO 


Track 579 

This  change  is  desirable  because  the  AREA  track  plans  now  include  both  straight 
and  curved  switches  as  recommended  practice,  and  a  speed  table  for  curved  switches 
should  be  added.  The  lengths  of  switch  points  for  each  turnout  shown  in  the  proposed 
tables  are  AREA  recommended  lengths. 

Page  5-35 

Delete  Fig.  511,  diagram  of  Speed  of  Trains  Through  Level  Turnouts,  as  the 
essential  data  shown  therein  are  incorporated  in  the  text  and  tables  presented  next  above. 

Page  5^5 

Delete  the  heading  "Proper  Methods  of  Tamping,"  and  the  entire  text,  and  in  lieu 
thereof  insert  the  following: 

TAMPING 

1.  General 

(a)  The  distances  shown  below  for  tamping  inside  and  outside  of  the  rail  are 
recommended  for  heavy  or  fast  traffic,  but  these  distances  may  vary  to  some  extent, 
depending  on  the  kind  of  traffic. 

(b)  The  term  "power  tamper"  used  as  a  tamping  tool  includes  any  tamping 
machine,   whether   operated   mechanically,   pneumatically   or   electrically. 

(c)  Uniformity  of  cross  level  in  tamping  is  the  prime  requisite  for  good  riding  track. 

2.  Tamping  Tools 

(a)  For  broken  stone,  crushed  and  washed  gravel  or  slag  ballast,  use  a  tamping 
pick,  tamping  bar,  ballast  fork  or  power  tamper.  The  power  tamper  should  have  a 
tamping  bar  with  a  tamping  end  similar  to  a  tamping  pick  face. 

(b)  For  gravel,  volcanic  cinders,  chats  or  chert  ballast,  use  a  shovel,  tamping  pick, 
tamping  bar  or  power  tamper.  For  heavy  traffic,  a  tamping  pick,  tamping  bar  or  power 
tamper  should  be  used.  The  power  tamper  should  have  a  tamping  bar  with  a  tamping 
end  of  sufficient  area.  For  Ught  traffic,  shovel  tamping  is  sufficient. 

(c)  For  engine  cinders  ballast,  use  a  shovel  only,  for  out-of-face  or  spot  tamping. 

3.  Methods  of  Tamping 

In  surfacing  out  of  face,  for  a  raise  of  3  inches  or  more,  track  with  8-foot  cross- 
ties  should  be  tamped  from  12  inches  inside  of  the  rail  to  the  end  of  the  tie,  and  track 
with  9-foot  crossties  should  be  tamped  from  18  inches  inside  of  the  rail  to  the  end  of 
the  tie.  For  a  raise  of  less  than  3  inches,  the  tamping  distances  inside  the  rail  should 
be  decreased  to  10  inches  and  16  inches,  respectively.  Ties  should  also  be  tamped  on 
the  outside  of  the  ends.  Tamping  should  not  be  permitted  at  the  center  of  the  tie. 
between  the  above  stated  tamping  limits,  but  this  center  area  should  be  filled  lightly 
with  a  ballast  fork.  Both  ends  of  the  ties  should  be  tamped  simultaneously  and  tamping 
inside  and  outside  of  the  rail  should  be  done  at  the  same  time.  Thorough  tamping  of 
ballast  under  the  rail  seat  should  be  required. 

Regardless  of  the  kind  of  ballast  or  the  kind  of  power  tamper  used,  two  tamping 
bars  should  always  be  worked  opposite  each  other  on  the  same  tie.  It  is  recommended 
that  power  tampers  be  started  from  a  nearly  vertical  position  and  used  directly  against 
the  sides  of  the  tie  to  be  tamped,  and  work  downward  past  the  bottom  corner,  after 
which  the  tools  may  be  tipped  down  to  force  the  ballast  directly  under  the  tie. 

The  track  should  be  raised  on  jacks  to  true  surface  and  the  ties  tamped  to  a  tight 
bearing  against  the  raised  rail,  but  without  disturbing  the  surface. 


580 Track 

For  spot  tamping,  tamping  picks,  tamping  bars  or  power  tampers  should  be  used. 
The  track  should  be  promptly  filled  in  and  finished  in  accordance  with  the  standard 
section. 


This  change  is   offered  for  the  purpose  of  setting  up  recommended  practices  that 
conform  with  modern  methods. 

On  Page  Containing  Table  of  Contents 

Below  the  two  items  under  "See  Portfolio  of  Trackwork  Plans  for  the  following" 
insert  "Data  for  Gages  and  Flangeways  in  Curved  Track." 


Report  on  Assignment  2 

Fastenings  for  Continuous  Welded  Rail 
Collaborating   With   Committee   4 — Rail 

G.  M.  Magee  (chairman,  subcommittee),  Lem  Adams,  L.  L.  Adams,  C.  W.  Baldridge, 
A.  L.  Bartlett,  W.  H.  B.  Bevan,  F.  J.  Bishop,  O.  U.  Cook,  E.  D.  Cowlin,  J.  A. 
Ellis,  H.  F.  Fifield,  F.  S.  Hales,  H.  H.  Harman,  N.  M.  Hench,  E.  T.  Howson, 
J.  de  N.  Macomb,  E.  E.  Martin,  W.  A.  Murray,  J.  B.  Myers,  J.  A.  Reed,  G.  J. 
Slibeck,  C.  R.  Strattman,  R.  P.  Winton. 

The  subcommittee  has  collaborated  with  a  subcommittee  of  Committee  4 — Rail, 
in  preparing  a  questionnaire  to  secure  information  on  various  installations  of  welded 
rail  and  reports  of  failures  occurring  in  the  welds.  This  information  may  be  found  in 
the  report  on  Assignment  6  of  the  Rail  committee  and  has  much  of  interest  bearing 
on  this  assignment. 

In  previous  reports,  the  subcommittee  presented  descriptions  of  installations  of 
continuous  welded  rail  on  the  Delaware  &  Hudson,  the  Bessemer  &  Lake  Erie,  and 
the  Central  of  Georgia,  together  with  reports  of  the  service  performance  of  these  installa- 
tions. The  officers  of  these  railways  have  furnished  supplemental  service  reports  this 
year  to  bring  this  information  up  to  date.  In  addition,  a  description  is  given  this  year 
of  a  test  installation  of  continuous  welded  rail  on  the  Great  Northern  Railway  in 
which  the  type  of  rail  fastening  used  is  different  from  those  used  in  the  three  installations 
mentioned  above.  The  reports  follow: 

Delaware  &  Hudson  Installations 

(M  &  L  Rail  Clips  and  Screw  Spike  Tie  Plate  Fastenings) 

We  have  experienced  no  difficulty  with  this  track  further  than  that  outhned 
in  Volume  40,  page  558  of  the  Proceedings,  with  the  exception  that  in  July, 
1940,  the  welded  rail  installed  at  Windsor,  N.  Y.,  kicked  out  of  hne  adjacent  to 
where  it  connects  with  joint  bar  track. 

Early  this  spring  we  experienced  some  creepage  of  the  joint  bar  track  in  a 
direction  toward  the  welded  rail,  and  it  is  beheved  that  the  difficulty  experienced 
with  the  welded  rail  kicking  out  of  hne  was  due  to  this  joint  bar  track  bunching 
against  the  end  of  the  welded  rail. 


Traek  _  5gl 

Bessemer  &  Lake  Erie  Installation — River  Valley,  Pa. 
(GEO  Rail  Clips  and  Tie-Plate  Construction) 

Our  last  report  was  dated  September  19,  1938,  and  since  that  time  we  have 
had  no  trouble  whatever  with  the  mile  of  welded  track,  except  for  one  broken 
joint — no  difficulty,  whatever,  as  to  buckling,  excessive  movement,  failure  or 
slippage  through  any  of  the  fastenings.  We  have  continued  current  records  of 
track  movements  which  show  nothing  of  interest. 

On  January  3,  1940,  our  section  foreman  discovered  a  broken  rail,  joint 
No.  174,  east  side  of  track,  in  the  low  rail  of  a  S-deg.  43-min.  curve.  The  tem- 
perature when  the  break  was  discovered  was  8  deg.  F.,  and  the  rail  at  the  break 
had  opened  up  ^  in.  Without  any  difficulty,  a  section  of  rail  38  in.  long  was 
cut  out,  and  a  new  section  put  in  and  fastened  with  angle  bars.  It  was  not  until 
June  that  the  Metal  &  Thermit  Corporation  was  in  a  position  to  replace  the 
short  section  put  in  in  January.  At  that  time  we  inserted  a  new  piece  of  rail, 
39  ft.  long,  and  two  welds  were  made,  this  being  done  between  trains.  The  parent 
metal  in  the  rail,  adjacent  to  the  break,  M'as  across  the  top  and  either  side  of  a 
weld,  and  it  is  our  opinion  that  this  metal  had  been  damaged  in  the  preheating 
process  at  the  time  the  original  weld  was  made.  Both  the  Metal  &  Thermit  Cor- 
poration and  we  are  of  the  opinion  that  methods  have  been  developed  to  control 
the  preheating  operation,  which  should  minimize,  or  prevent,  the  danger  of 
damaging  the  parent  metal  in  the  preheating  process. 

We  estimate  the  total  tonnage,  including  weight  of  equipment,  over  the 
welded  rail  since  it  was  installed  in  November,  1935,  at  65,000,000  tons,  up  to 
August  1,  1940. 

Practically  no  maintenance  work,  other  than  inspection  and  the  replacing 
of  the  one  broken  rail,  mentioned  above,  has  been  necessary  since  our  last  report. 
The  track  remains  in  first  class  fine  and  surface  and  is  giving  very  satisfactory 
performance. 

Central  of  Georgia  Railway  Installation — Lovejoy,  Ga. 

(Cut  Spike  Rail  Fastening,   Cut  Spike  Tie-Plate  Fastening,  Rail  Anchors) 

A  complete  report  on  this  installation  was  given  in  Vol.  40,  page  549,  including 
measurements  of  temperature  stresses  and  rail  movements  due  to  temperature  and 
traffic.  The  subcommittee  suggested  that  it  would  afford  valuable  information  to  increase 
the  number  of  rail  anchors  and  repeat  these  measurements. 

Mr.  R.  R.  Cummins,  general  manager,  Central  of  Georgia,  advises  that  12  rail 
anchors  per  panel  have  been  appHed  to  this  track,  and  the  measurements  resumed  on 
July  30,  1940.  Data  will  be  furnished  the  subcommittee  after  the  rail  has  gone  through 
a  year's  cycle  of  high  and  low  temperatures. 

No  difficulties  in  maintenance  of  the  installation  were  reported. 

Great  Northern  Railway 

(M  &  L  Rail  CUps,  Cut  Spike  Tie-Plate  Fastening) 

In  August  1937  we  laid  a  total  of  5,667.8  track  feet  of  110-lb.  rail  with 
welded  joints  and  M  &  L  fastenings  just  east  of  our  station  at  Rexford,  Mont. 
The  east  759.4  ft.  of  this  rail  is  on  tangent,  then  there  is  a  3 -deg.  curve  for 
531  ft.,  and  then  tangent  for  4,377.4  ft. 

Before  any  work  was  done  in  connection  with  the  rail  the  track  was  given 
a  Hft  with  washed  gravel  ballast  from  our  washing  plant  at  Warland.  The  instruc- 


582 


Track 


View  of  the  Welded 

Rail  on  the  Great 

Northern  at  Rexford 


tions  called  for  at  least  12  in.  of  ballast  below  the  bottoms  of  the  ties  and  pro- 
vided for  19  ft.  between  ballast  lines  and  a  12->2  ft.  width  of  ballast  level  with 
the  tops  of  ties. 

The  rail  was  furnished  by  the  Bethlehem  Steel  Company  from  its  Lacka- 
wanna plant  in  39-ft.  lengths,  undrilled,  and  controlled  cooled,  of  Great  Northern 
standard  110-lb.  section.  The  rail  was  distributed  on  the  north  side  of  the  track, 
the  nearest  rail  being  4-J^  ft.  from  the  track  and  the  distance  between  rails 
2-y2  ft.  The  ends  were  supported  on  two  ties. 

The  weld  was  of  the  Thermit  process,  the  work  being  done  under  the  super- 
vision of  the  Metal  &  Thermit  Corporation.  The  welding  was  started  on  August 
10  and  completed  on  August  21. 

New  double-shoulder  tie  plates  8-J^  x  12  in.,  according  to  the  Great  Northern 
standard  plan,  were  used  with  M  &  L  clips.  The  tie  plates  were  fastened  to  the 
ties  in  the  outside  holes  with  cut  spikes. 

Screw  Spikes  for  Holding  Down  Tie  Plates, 
Independent  of  the  Rail  Fastenings 

Your  subcommittee  was  asked  to  submit  a  recommended  design  of  screw  spike 
which  could  be  used  for  securing  the  tie  plate  to  the  tie  independently  of  the  rail 
fastening.  Investigation  showed  that  most  railways  using  screw  spikes  for  this  purpose 
had  purchased  spikes  according  to  Designs  A  or  B  in  the  accompanying  drawing, 
except  that  some  of  the  roads  using  Design  A  have  lengthened  the  cylindrical  portion 
of  the  shank  under  the  head.  The  principal  differences  in  the  two  designs  are  in  the 
shape  of  the  head,  the  diameter  of  the  shank,  depth  of  thread,  length  of  the  straight 
portion  of  the  shank  under  the  head,  and  the  taper.  These  differences,  in  the  opinion 
of  the  subcommittee,  did  not  justify  the  adoption  of  a  new  design  and  it  was  thought 
one  of  these  designs  should  be  recommended. 


Track 


583 


Accordingly,  a  questionnaire  was  addressed  to  various  manufacturers  of  screw 
spikes  which,  together  with  abstracts  of  the  replies,  is  included  in  the  accompanying 
tabulation. 


Design  B 


The  shape  of  the  head  in  design  "B"  insures  longer  life  of  the  chucks  used  in 
applying  the  screw  spikes  and  also  affords  a  better  grip  during  the  life  of  the  spike 
as  the  head  is  reduced  by  corrosion.  Also,  the  greater  depth  of  thread  affords  a  con- 
siderable increase  in  the  holding  power  of  Design  B  compared  to  Design  A.  These 
advantages  would  seem  to  offset  the  objections  expressed  by  certain  of  the  manufacturers. 


584 


Track 


Questionnaire  Sent  to  Screw  Spike  Maniifacturers  and  Abstracted  Repllos 


Question 

ManuXact 

irer 

1,     la  there  any  difference 

A 

B 

C 

D 

Square  head  on 

Square  head  on 

Design  A  costs 

Prefer  design 

in  the  coat  of  nianufactur- 

Design  A  oosta 

Design  A  costs 

less 

3.     No  differ- 

Ine Designa  A  and  B? 

less  to  manufacture 

less.     Should 
have  9/16" point. 

ence  In  cost 

2.     Can  you  roll  Design  B 

from  15/16  In.   stock  to  5/8 

Yes 

Yea 

Yes 

Yea 

in.  dlametor  at  the  root  of 

the  threads'? 

3.     Can  the  length  between  the 

Thinks  one  length 

Length  can  be 

Length  can  be 

underaldo  of  the  head  and  the 

should  be  made 

varied,  but  at 

varied  to  l/2 

Yes 

thread  be  varied  to  suit  the 

standard. 

extra  cost. 

in.  minimum. 

purchaser  and  without  extra 

cost? 

Ij.     Is  the  base  price  for 

Suggest  Design 

Yes,   but  if 

dosigns  A  and  B  the  same? 

No 

A  be  made  stand- 
ard and  Design  B 
a  special  alter- 
nate. 

design  B  Is  made 
standard  a  high- 
er price  for 
screw  spikes  will 
probably  result. 

Yes 

5,     To  i*at  railroads  ha-re  you 

Chesapeake  and 

Pennsylvania; 

Illinois  Central; 

Bessemer  and 

sold  screw  spikes  for  holding 

Ohio; 

Delaware  & 

Duluth,  Uissabo, 

Lake  Erie; 

dawn  tie  platea  within  the 

Erie 

Hudson; 

i  Iron  Range; 

Chesapeake  & 

oast  five  years? 

Erie; 

Missouri  Pacific; 

Ohio; 

Chesapeake  4 

Pere  Mfirquette; 

Hew  York  Central 

Ohio. 

Chesapeake  4  OhiO] 
Southern  Pacific; 
Milvmukee  Road; 

A  hole  of  11/16  in.  diameter  should  be  pre-bored  in  hardwood  ties  for  insertion 
of  the  spike.  In  softwood  ties,  the  hole  should  be  of  ^  in.  diameter.  Care  should  be 
taken  to  locate  the  hole  in  the  center  of  the  tie  plate  hole  and  also  to  avoid  overdriving 
the  screw  spike  and  stripping  the  wood  threads  formed  by  the  screw  spike  threads. 


This  report  is  submitted  as  information. 


Report  on  Assignment  3 

Plans  and  Specifications  for  Track  Tools  and  Recommended 

Limits  o£  Wear 

Collaborating  with   Committee   1 — Roadway  and   Ballast  and 
Committee  22 — Economics  of  Railway  Labor 

W.  L.  Roller  (chairman,  subcommittee),  W.  H.  B.  Bevan,  E.  W.  Caruthers,  L.  W.  Des- 
lauriers,  J.  A.  Ellis,  J.  W.  Fulmer,  F.  S.  Hales,  E.  T.  Howson,  F.  J.  Jerome,  J.  H. 
Kelly,  E.  E.  Martin,  J.  B.  Myers,  C.  J.  Rist,  I.  H.  Schram,  J.  F.  Shaffer,  G.  M. 
Strachan. 

The  committee  submits  the  following  revisions  to  the  Manual: 

Plan  No.  7 — Tie  Tongs,  appears  in  the  Manual,  page  S-S7,  Fig.  519.  These  tongs 
were  found  to  be  too  light  in  construction  to  render  satisfactory  service  in  the  handling 
of  cross  and  switch  ties  now  in  use,  being  too  flexible  and  prone  to  become  worn  around 
the  rivet.  Plan  No.  7-41  has  been  prepared,  which  is  of  sturdier  design  and  reinforced 
around  the  rivet,  and  it  is  offered  for  adoption  and  publication  in  the  Manual  in  place 
of  Plan  No.  7. 

Plan  No.  27-41 — Track  Level,  has  been  revised  to  show  some  corrections  on  dimen- 
sions of  the  fixed  end  casting  to  agree  with  over  all  dimension.  It  is  offered  for  publica- 


Track 


S8S 


t^V- 


586 


Track 


NOTE.' 


17i 


.POINTS  TO  Bt 
FIN15HE.D  BY  QRlNOlNG 


3i" 


FURNISHED   IN   OPEN   HEARTH 
OR   ALLOY    STEEL 

NO  HARDNE5S    TESTS  REQUIRED 

TOLERANCE— 

2  %  ON  le:ngth 

5  %  ON  CROSS  SECTION 

APPROX.  WT  10  LB. 


A.  R.  E.  A 

TIE   TONGS 

MAR.  1941       PLAN  NO.7-41 


!=^ 


■r-m- 


^SlIUklGHT  GRMNtO  NORTHtRH  WHITE  ASH 


.  il.tU   I! 


o  »  o 


4'  Sf "  GUARD  CHECK  SAGE. 


4'fi2 


4« 

A.R.E.A. 

TRACK  GAGE 
MAR.  1938    PLANNO20-A-4I 


Track 587 

tion   in   the   Manual   in   place   of   Plan   No.   27^0,   now   appearing   in   the   Manual   on 
page  5-68. 

Last  year  the  committee  submitted  as  information,  Plan  No.  20A-40 — Wood  Con- 
nected Track  Gage,  as  shown  on  page  562  of  Volume  41,  Proceedings  for  1940.  This  plan 
has  been  revised  to  provide  better  clearance  over  guard  rail  and  as  to  type  of  wood  in 
the  beam.  It  is  now  submitted  as  revised  for  adoption  and  publication  in  the  Manual  as 
Plan  No.  20A-41. 

Recommended  Limits  of  Wear  of  Track  Tools 

Last  March  the  committee  was  given  the  added  assignment  of  Recommended  Limits 
of  Wear  of  Track  Tools  (for  Reclamation  purposes)  and  submits  the  following  progress 
report — 

It  was  assumed  in  pursuing  the  study  of  Limits  of  Wear  for  Track  Tools,  that  a  defi- 
nite recommendation  is  desired  for  each  particular  tool  which  would  indicate  the  minimum 
limit  of  reclaimed  tools.  Only  tools  which  are  otherwise  sound  and  serviceable  without 
flaw  or  physical  defect  should  be  considered  for  reclamation  and  the  minimum  recom- 
mended sizes  of  reclaimed  tools  are  indicated  in  dashed  lines  on  original  plans. 

The  committee  recommends  the  reclamation  of  the  tools  listed  below  (now  included 
in  the  Manual)  either  by  grinding  or  by  forging  as  specified  in  each  case  and  to  the 
outline  (minimum)  indicated  in  dashed  lines  on  plans.  It  is  understood  in  making  these 
recommendations  that  the  tool  is  to  be  reshaped,  using  only  the  native  or  original  metal 
and  no  new  metal  is  to  be  applied  by  welding  to  restore  the  tool  to  desired  contour. 
The  original  physical  properties  are  to  be  unimpaired. 

Tools  showing  checks,  cracks  or  other  physical  defects,  which  might  impair  their 
usefulness  or  safety,  are  not  to  be  repaired. 

Tools  recommended  for  reclamation  may  be  repaired  and  reconditioned  for  re-use 
from  time  to  time  and  until  the  minimum  limit  is  reached.  When  worn  beyond  these 
limits,  tools  should  be  scrapped. 

Tools  to  be  reclaimed  must  be  in  such  condition  that  after  preparation  for  re-issue, 
their  minimum  size  shall  not  be  less  than  as  outlined  in  dashed  lines  on  plans  Nos.  1,  2, 
3,  S,  12,  12A,  13,  14,  IS,  16,  17,  18,  19,  and  21,  as  included  as  a  part  of  this  report. 

Plan  No.  1. — Clay  Pick.  To  be  reclaimed  by  forging  and/or  grinding.  Tool  should 
be  kept  in  good  balance  by  keeping  ends  approximately  equal  in  length  and  weight. 
Original  contour  should  be  maintained  at  or  near  the  eye. 

Plan  No.  2. — Tamping  Pick.  To  be  reclaimed  by  forging  and/or  grinding.  Tool 
should  be  kept  in  good  balance  by  keeping  ends  approximately  equal  in  length  and 
weight.  Original  contour  should  be  maintained  at  or  near  the  eye. 

Plan  No.  3. — Spike  Maul,  Design  No.  1.  If  made  of  open  hearth  steel,  reclaim  by 
forging;  if  alloy,  by  grinding. 

Plan  No.  3. — Spike  Maul,  Design  No.  2.  If  made  of  open  hearth  steel,  reclaim  by 
forging;  if  alloy,  by  grinding. 

Plan  No.  5. — Lining  Bar. 

Plan  No.  12. — Track  Adze.  As  this  is  an  alloy  tool,  it  should  be  reclaimed  by  grind- 
ing only. 

Plan  No.  12 A. — Carpenter  Adze.  As  this  is  an  alloy  tool,  it  should  be  reclaimed  by 
grinding  only. 

Plan  No.  13. — Double  Face  Sledge. 

Plan  No.  14. — Tamping  Bar,  Chisel  End.  Reclaim  by  forging  to  limits  shown. 

Plan  No.  IS. — Tamping  Bar,  Spear  End.  Reclaim  by  forging  to  limits  shown. 


588 


Track 


TOLERANCE  - 

2%  ON   LENGTH 

5%  ON  CROSS    SECTION 


DOUBLE    POINTED    PICK  SHALL  BE 
fURNISHED  WHEN  SPECIFIED.  EITHER 
TYPE  SHALL  BE  FURNISHED  IN  OPEN 
HEARTH  OR  ALLOY  STEEL  AS  SPECI- 
FIED. 


DETAIL  OF 
EYE 


-ARROWS   SHOWING  POINT  WHERE   HARDNESS   IS  TAKEN 


^ 


h3H 


\-2i^ 


Tf — 
=1® 


^ 


BRINELL         425  -  500 
FOR  O.H.  STEEL  ONLy, 


APPROX.  WT  7  LB. 

RtClAIM  LIMITS: 

DASHED  UNE5  INDICATC  OUTimE 
(MINIMUM]  or  TOOLS  AS  RLCUUMCD 


note:- 

CURVATURE  OF  BACK  SHALL  BE 
CONTINUOUS  AND  OF  30* RADIUS 
EXCEPT  WHERE  FLATTENED  OVER 
THE  EYE.  RADIUS  TO  BE  COINCIDEKT 
WITH  CENTER  LINE  OF  EYE, 

A.  R.   E.  A. 

CLAY  PICK 

MAR.  1939     PLAN  NO.I-42 


TOLERANCE - 

2%  ON  LENGTH 

5  %  ON  CROSS  SECTION 


FURNISHED  IN  OPEN  HEARTH   OR 
ALLOY  STEEL  AS   SPECIFIED 


APPROX 


8    LB 


RECLAIM    LlMlTj: 

DASHtD  UNE5  INDICME. 
OUTLINE  (minimum)  OF  TOOLS 
AS  RECUlMtO 


NOTE  :■ 

CURVATURE  OF  BACK  SHALL  BE 
CONTINUOUS  AND  OF  3O"RA01US    EXCEPT 
WHERE  FLATTENED  OVER  THE  EYE, 
RADIUS  TO  BE  COINCIDENTWITH  CENTER 
LINE  OF  EYE. 

A.   R.   E.  A. 

TAMPING    PICK 

MAR.  1939     PLAN  N0.2-4E 


Track 


589 


DIA 

NO 
APPROX   WEIGHT     10  LB 

EYE    TAPERED  TO  CENTER 

4' ON  LONG    DIAMETER 

3' ON  SHORT    DIAMETER. 
TOLERANCE  - 

2%0N  LENGTH 

5540N  CROSS  SECTION. 
FURNISHED  IN   OPEN   HEARTH    OR 

ALLOY   STEEL  AS   SPECIFIED. 


BRINELL      4.25-500 


NO.  2. 

APPROX  WEIGHT 


RECLAIM    LIMITS; 

DA5HtO  LlNtS   mOlCATt 
OUTLINE   [minimum)  Of  TOOLS  ti 
RtCLAlMEO. 


A.  R.  E.  A. 

SPIKE  MAULS 

MAR.  1936       PLAN  NO.3-42 


hH 


TOLERANCE  - 

ZX  ON    LENGTH 

^y.   ON    CROSS    SECTION 


3€ 


'4r 


^-?::xl\ 


•«=^i  "5-^ 

Pe^ 


^^iZ^   -i^-.. 

y 

—  E-* 

!i-J 

t 

■• 

3C 


ARROWS    SHOWING    POINT 
WHERE  HARDNESS    IS   TAKEN 


SCHEDULE   OF    DIMENSIONS                  | 

APPROX 
WEIGHT 

A 

B 

C 

D 

E 

F 

N 

18  LB 

5-0" 

3" 

4 

14 

14" 

3" 

■i" 

10" 

20  " 

5-3" 

3° 

4 

14" 

14" 

3" 

li" 

lO' 

26" 

5-6" 

7" 
8 

14" 

14" 

3" 

'-^" 

10' 

ORDER  SHALL  SPECIFY  TYPE  OF 
POINT  AND  LENGTH  OF  BAR 


BRINELL   300-375 

RtCLWM  LIMITS 

DASHtO  UNtS  INOlCkTl   OUTUNf. 
(minimum)   of   tools  «  RULWMtO 


A.  R    E.  A. 
LINING    BAR 

MAR.  1936      PLAN  NO.  5. 


590 


Track 


TOLERANCE  - 

2% ON  LENGTH 

5%  ON    CROSS    SECTION 


FURNISHED  IN  OPEN   HEARTH  OR 
ALLOY    STEEL  AS  SPECIFIED. 


SECTION    X-X 


POINT    WHERE    HARDNESS    IS    TAKEN- 
7"- BIT    5     LB. 


APPROX.    WT.     -     8"-  BIT    Sj  LB. 
_  9"-  BIT    6     LB. 

RtCLMM   UWnS"- 

OASHtD  uiits  mmcMt  outuhe. 

(minimum)  Of  TOOLS  AS  RECLA\MED 


A.  R.  E.  A. 

TRACK   ADZE 

MAR.  1936        PLAN  NO.  12 


RECLAIM   UMHS: 

DASHED  L',HE5  WOltATt 
OUTLINE  (minimum)  OF  TOOLS  AS 
RtCLMMED. 


TOLERANCE - 

2%  ON    LENGTH 
5%  ON   CROSS  SECTION 
FURNISHED  IN  OPEN  HEARTH  OR 
ALLOY    STEEL  AS  SPECIFIED 


A.  R.  E.  A. 
CARPENTERS    ADZE 

MAR.  1935  PLAN  NO.I2-A-48 


Track 


591 


TOLERANCE  - 

2%  ON    LENGTH 

5^  ON    CROSS    SECTION 


FURNISHED    IN  OPEN    HEARTH 
OR    ALLOY     STEEL  AS  SPECiriED 


BRINELL       425-500 


RECLAIM    UMllS- 

DASHED  LINES  IHDICATE    OUTUNE 
(minimum)  of  tool  as   RECLAIMED. 

EYE    TAPERED     TO    CENTER 
4*   ON    LONG     DIAMETER 
3*  ON    SHORT    DIAMETER 


SCHEDULE   OF    DIMENSIONS     IN 
INCHES 

APPROX 
WEIGHT 

A 

B 

c 

D 

E 

F 

H 

6  LB. 

6 

2^ 

3 

,  3 

3 

16 

'-  4 

8  LB. 

4 

2J 

3l 

1  3 

3 

16 

zi 

10  LB 

7 

4 

3i 

.3 

1 
4 

3 

12  LB 

7i 

4 

3| 

.3 

'a 

1 
4 

3i 

14  LB. 

8 

2| 

4 

,3 

1 
4 

3i 

16  LB 

8i 

3| 

4 

.3 

'a 

1 

3-1 

A.    R    E.  A. 
DOUBLE   FACED   SLEDGE 

MAR.  1936  PLAN  NO  13-42 


TOLERANCE  - 

2%  ON   LENGTH 

5/i  ON   CROSS   SECTION 


~M 


ARROWS    SHOWING   POINT  WHERE    HARDNESS    IS   TAKEN 


BRINELL  425-  500 


etCUlM   LIMITS 

DASHED  LINES  INOlCMt.  OUTLlUE 
(minimum)   of  TOOLi  AS  RECLA\MtD 


APPROX      WT      13  LB 

AREA 

CHISEL  END  TAMPING   BAR 

MAR.    1936  PLAN  NO    14-42 


592 


Track 


TOLERANCE— 

2%  ON    LENGTH 

5^0N    CROSS    SECTION 


H 


T 


2  9 — tr 


4-7^ 
-5-8' 


3" 


-'/.I'' 


5-er- 


3    C 


ARROWS    SHOWING  POINT   WHERE    HARDNESS    IS  TAKEN 


BRINELL       425-500 
APPROX     WT    15   LB 


RtCLAlM   LIMITS 

DASHtO  UNtS  INDICATE  OUTLlNt 
(mihimum)  of  tools   A.S  RE.CLA1MLD 


AREA 

SPEAR    END    TAMPING   BAR 

MAR   1936  PLAN     NO    15-48 


i-ARROWS   SHOWING  POINT  WHERE    HARDNESS    IS  TAKEN 
TOLERANCE - 

2%ON  LENGTH,  5%  ON  CROSS  SECTION. 
EYE    TAPERED    TO    CENTER 

4'  ON   LONG    DIAMETER 

3*  ON   SHORT    DIAMETER. 
FURNISHED  IN   OPEN   HEARTH,  OR 
ALLOY  STEEL  AS  SPECIFIED. 


RRIWFI  I   JPOINT    477-5321  ""OR  O.  H. 
t3«iNE.L.i_  |heaD     2e6-340J  STEtL  ONf 


APPROX  WT 

A 

B 

F 

R 

C 

5^  LBS. 

9i" 

4' 

5,1' 

I8b" 

5" 

e^  LBS 

loi" 

6^ 

6l|" 

334 

5^" 

RECLAIM  LIMITS; 

DASHtO  Lints  IMDlCATt 
OUTLINE  (minimum)  OF  T0OL5  AS 
RECLAIMED 


A.   R.  E.  A. 

TRACK    CHISEL 

DESIGN     NO.  I. 
MAR.  1939       PLAN  NOIS-42 


Track 


593 


kii'^ 


THIS    DESIGN   FURNISHED   IN   ALLOY    STEEL   ONLY 
APPROX  WEIGHT    bi  LB. 


TOLERANCE  - 

2%0N   LENGTH,  5% ON  CROSS  SECTION. 
EYE    TAPERED    TO    CENTER 

4*   ON  LONG    DIAMETER 

3*  ON   SHORT    DIAMETER 
RtCLAIM    limits: 

OASHLO   LlHtS  mOlCATE.  OUTUNt 
(Mimt^UM)  OF  TOOIS  AS  RtCLAlMtO. 


A.   R.  E.  A. 
TRACK    CHISEL 

DESIGN    NO. 2. 
MAR.  1939       PLAN  NO.17-42 


ARROWS   SHOWING  POINT   WHERE    HARDNESS   IS  TAKEN 


-^1 


POINT-    4.77-532 
HEAD  —   286-340 


TOLERANCE - 

25iON  LENGTH 

SJiON  CROSS  SECTION 
EYE    TAPERED    TO    CENTER 

4*  ON   LONG    DIAMETER 

3*  ON   SHORT   DIAMETER 

RtcuiM  uMni; 

DASHIO  UNtS  mOICATt 
OUTLINE  (minimum)  OF  TOOLS 
AS  RlCLAIMtD. 


APPROX   WEIGHT    4  LB 


A    R    E,  A 
TIE    PLUG   PUNCH 

MAR.  1936  PLAN    NO.  18-4? 


5Q4 


Track 


-ARROWS    SHOWING  POINT  WHERE    HARDNESS    IS  TAKEN - 


SECTION  y-x 


APPROX   WEIGHT     SJ   LB. 

TOLERANCE  — 
2/6  ON    LENGTH 
5%  ON    CROSS    SECTION 

EYE  TAPERED  TO  CENTER 
4°  ON  LONG  DIAMETER 
3'   ON   SHORT    DIAMETER 

RECLWM   LIMITS: 

DASHtO  LlN£i  INOICHTE.  OUUINE. 

(minimum)  or  TOOLS  as  RtCHlMtD 


BRINELL 


^1 


POINT      477-532 
HEAD        286-340 


A    R.  E   A 

ROUND   TRACK  PUNCH 

MAR.  1936       PLAN  NO    19-42 


WELDED  OR  RIVETED  TYPE 

NOTE: 
'a-         HANDLE  TOPS  WILL  BE  FURNISHED  SUBJECT  TO  APPROVAL 

OF  PURCHASER  AS  SPECIFIED  IN  SPLIT  WOOD"d"  MALLEABLE 

"d"OR  COMBINATION  STEEL  WOOD"d'.' 
'B-         FOOT  TREAD  ON  TOP  OF  BLADE   APPROX,   i    WIDE  SHALL 

BE  FURNISHED  WHEN  SPECIFIED  '^ 

ROCKWELL    45-50 


SOLID  SHANK  TYPE 


A.  R.    E.  A. 

TRACK     SHOVELS 

MAR.    1936        PLAN  NO.  21. 


Track 595 

Plan  No.  16. — Track  Chisel,  Design  No.  1.  Reclaim  by  forging  if  open  hearth  and 
by  grinding  if  alloy. 

Plan  No.  17. — Track  Chisel,  Design  No.  2.  By  grinding  only. 

Plan  No.  18. — Tie  Plug  Punch.  Reclaim  by  forging. 

Plan  No.  19. — Round  Punch.  Reclaim  by  forging. 

Plan  No.  21. — Track  Shovel.  Length  of  blade  10  in.,  economical  wear  limit. 


The  report  on  Recommended  Limits  of  Wear  of  Track  Tools  is  a  progress  report. 
The  committee  recommends  the  subject  be  continued. 


Report  on  Assignment  4   (a) 

Plans  for  Switches,  Frogs,  Crossings,  Spring  and  Slip  Switches 
Collaborating  with   Signal   Section 

E.  W.  Caruthers  (chairman,  subcommittee),  L.  L.  Adams,  W.  H.  Bettis,  L.  H.  Bond, 
C.  W.  Breed,  E.  D.  Cowlin,  H.  Q.  Day,  L.  W.  Deslauriers,  J.  A.  Ellis,  J.  W.  Fulmer, 
N.  M.  Hench,  F.  W.  Hillman,  A.  F.  Huber,  W.  G.  Hulbert,  C.  T.  Jackson,  A.  A. 
Johnson,  L.  I.  Martin,  F.  H.  Masters,  K.  R.  McLennan,  R.  E.  Miller,  W.  A.  Murray, 
J.  B.  Myers,  G.  A.  Peabody,  S.  H.  Poore,  J.  A.  Reed,  O.  C.  Rehfuss,  C.  J.  Rist, 
I.  H.  Schram,  G.  L.  Sitton,  G.  J.  SUbeck,  C.  R.  Strattman,  H.  N.  West,  R.  P.  Winton, 
J.  G.  Wishart,  M.  J.  T.  Zeeman. 

As  stated  in  the  report  of  the  committee  appearing  in  Proceedings,  Vol.  41,  page  565, 
a  review  is  being  made  of  all  of  the  trackwork  plans  and  specifications  which  have  been 
approved  by  the  Association  as  recommended  practice.  Following  the  acceptance  by  the 
Association  of  the  key  plans  presented  with  the  above  mentioned  report,  work  has 
progressed  on  the  remaining  plans  of  the  various  series,  in  line  with  the  details  accepted 
in  the  approved  key  plans. 

To  place  the  information  in  the  hands  of  the  association  at  the  earliest  date  possible, 
groups  of  plans  embraced  in  this  report  were  published  in  Bulletin  418,  June-July,  1940, 
page  209,  and  Bulletin  419,  September-October,  1940,  page  139  and  Part  IL 

To  serve  as  a  temporary  index,  the  following  list  shows  the  status  of  all  of  the  old 
plans  as  well  as  a  complete  list  of  the  reissued  plans.  Plans  adopted  in  1940  are  identified 
by  suffix  "-40",  those  now  offered  for  adoption  by  the  suffix  "—11",  and  these  which 
are  to  be  reissued  without  revisions  requiring  convention  approval  are  designated  by  a 
suffix  indicating  the  year  of  adoption.  There  is  also  a  list  of  plans  to  be  withdrawn. 

All  details  with  which  the  use  of  signal  material  is  involved  have  been  developed 
in  collaboration  with  the  Signal  Section  of  the  AAR. 

The  Standardization  committee  of  the  Manganese  Track  Society  has  continued  its 
valuable  assistance  in  the  preparation  of  these  plans  and  specifications  and  also 
contributed  all  of  the  necessary  drafting  work. 

Conclusions 

The  committee  offers  for  adoption  as  recommended  practice  and  publication  in  the 
Manual  the  plans  with  the  suffix  "-41"  in  the  followinc  list: 


596 


Track 


Plan  No. 

Title 

Switches 

111-41 

16'  6"  Straight  Split  Switch 

with  Uniform  Risers. 

112-41 

16'  6"  Straight  Split  Switch 

with  Graduated  Risers. 

113-41 

11'  0"  Straight  Split  Switch 

with  Uniform  Risers. 

114-41 

11'  0"  Straight  Split  Switch 

with  Graduated  Risers. 

115-41 

22'  0"  Straight  Split  Switch 

with  Uniform  Risers. 

116-41 

22'  0"  Straight  Split  Switch 

with  Graduated  Risers. 

117-41 

30'  0"  Straight  Split  Switch 

with  Uniform  Risers. 

118-41 

30'  0"  Straight  Split  Switch 

with  Graduated  Risers. 

121-41 

11'  0"  Curved  Split  Switch 

with  Uniform  Risers. 

123-41 

19'  6"  Curved  Split  Switch 

with  Uniform  Risers. 

125-41 

30'  0"  Curved  Split  Switch 

with  Uniform  Risers. 

127-41 

39'  0"  Curved  Split  Switch 

with  Uniform  Risers. 

209-41 

Numerical  and  Classified  Index 

of  Detail  Numbers  Covering 

Switch  Fittings. 

213-41 

11'  0"  Split  Switch  Point 

Derail. 

221-40 

Details  for  Switch  Points. 

222-41 
223-40 

224-40 


241-41 


Switch  Stands 
251-41 


Remarks 


Revision  of  Plan  No.  111-40. 
Revision  of  Plan  No.  112-40. 


Supersedes  Plan 

vised  1938. 
Supersedes  Plan 

vised  1938. 
Supersedes  Plan 

vised  1938. 
Supersedes  Plan 

vised  1938. 
Supersedes  Plan 

vised  1938. 
Supersedes  Plan 

vised  1938. 
Supersedes  Plan 

adopted  1939. 
Supersedes  Plan 

adopted  1938. 
Supersedes  Plan 

adopted  1938. 
Supersedes  Plan 

adopted  1937. 
Supersedes  Plan 

adopted  1938. 


No.  103,  re- 
No.  104,  re- 
No.  105,  re- 
No.  106,  re- 
No.  107,  re- 
No.  108,  re- 
No.  121, 
No.  123, 
No.  125, 
No.  127, 
No.  209, 


Switch  Rods  and  Clips. 
Switch  Plates  and  Rigid  Rail 

Braces. 
Switch  Plates  and  Adjustable 

Rail  Braces. 

Details  and  Typical  Applica- 
tions of  Twin  Tie  Plates. 

Switch  Stands  and  Appurten- 
ances. 


Supersedes  Plan  No.  213,  re- 
vised 1934. 

Supersedes  in  part  Plans  Nos. 
101  and  108  inc.,  201  and  204 
revised  1934,  Plan  No.  215 
adopted  1937,  and  Plan  No. 
140  adopted  1938. 

Revision  of  Plan  222-40. 

Supersedes  in  part  Plans  Nos. 
201,  202,205,206,207. 

Supersedes  in  part  Plan  No.  240, 
revised  1935  and  Plan  No. 215, 
adopted  1937. 

Replaces  Plan  No.  325,  revised 
1934,  withdrawn  1940. 

Supersedes  Plans  Nos.  251  to 
254  inch,  revised  1934. 


The  plans   published  during   the  year,   which  are   now  offered   for   adoption,   appear  in  bulletins  as 
follows: 


Bulletin  418 
June-July,  1940 
111-41 
112-41 
113-41 
114-41 
llS-41 
116-41 
117^1 
118-41 
241^1 


Bulletin 

419 

September-October,   1940 

121-41 

704-41 

123-41 

705-41 

125-41 

706-41 

127-41 

708-41 

222-41 

710-41 

600-41 

755-41 

611-41 

757-41 

612-41 

761-41 

613-41 

910-41 

614-41 

911-41 

615-41 

912-41 

702-41 

920-41 

703-41 

921-41 

Bulletin  423 
February,  1941 
209-41 
213-41 
251-41 
320-41 
322-41 
323-41 
324-41 
401-41 
405-41 
640-41 
670-41 
700-41 
768-41 
774^1 
775-41 


Track 


597 


Plan  No.  Title 

255-34  Plan  and  Specifications  for 

Switch  Lock. 
Bolted  Rigid  Frogs 
320-41  Data  and  Sections— Bolted 

Rigid  Frogs. 
322-41  No.  4,  No.  5  and  No.  6  Bolted 

Rigid  Frogs. 

323-41  No.  7,  No.  8  and  No.  9  Bolted 

Rigid  Frogs. 
324-41  No.  10,  No.  11  and  No.  12 

Bolted  Rigid  Frogs. 
Spring  Rail  Frogs 
401^1  No.  10  Spring  Rail  Frog 


405-41  No.  10  Spring  Rail  Frog 

Short  Spring  Rail  Type. 
Guard  Rails 

502-40  Setting  for  Guard  Rails;  Tee- 

Rail  Design. 
503-40  Guard  Rails;  Tee-Rail  Design 

with  Planed  Flares  and 

Canted  Plates. 
504-40  Guard  Rails;  Tee-Rail  Design 

with  Planed  Flares  and  Flat 

Plates. 
505-40  Specifications  for  Guard-Rail 

Clamps. 
510-40  Manganese  Steel  One-Piece 

Guard  Rails. 
590-40  Diagram  Illustrating  Preferred 

Names  of  Parts  for  Guard 

Rails. 

Rail  Bound  and  Solid  Manganese  Frogs 


Remarks 
Reissue  of  Plan  No.  255,  revised 
1934. 

Supersedes  Plan  320,  revised 
1938. 

Supersedes  in  part  Plan  No. 
301-3  and  Plan  No.  309,  re- 
vised 1934. 

Supersedes  in  part  Plan  No. 
301-3,  revised  1934. 

Supersedes  Plan  304-6,  revised 
1934. 

Supersedes  Plan  No.  401  and 

Plan  No.  404,  revised  1934. 
Supersedes  Plan  No.  405,  adopt- 
ed 1939. 

Supersedes  Plan  No.  502,  re- 
vised 1934. 

Companion  plan  to  Plan  No. 
504-40,  but  showing  canted 
instead  of  flat  plates. 

Supersedes  Plan  No.  504,  re- 
vised 1934. 

Revision  of  Plan  No.  505, 

adopted  1934. 
Revision  of  Plan  No.  510, 

as  revised  1934. 
Revision  of  Plan  No.  590  as 

revised  1934. 


600-41 

600B-34 

611-41 
612-41 

613-41 

614-41 

615-41 

640-41 
670-41 
700-41 


Data  and  Sections  for  Rail 

Bound  Manganese  Steel 

Frogs. 
Standard  Manganese  Steel 

Frog  Point  and  Flangeway 

Layout. 
No.  4  and  No.  5  Rail  Bound 

Manganese  Steel  Frogs. 
No.  6,  No.  7  and  No.  8  Rail 

Bound  Manganese  Steel 

Frogs. 
No.  9,  No.  10,  and  No.  11 

Rail  Bound  Manganese 

Steel  Frogs. 
No.  12,  No.  14,  and  No.  15 

Rail  Bound  Manganese 

Steel  Frogs. 
No.  16,  No.  18,  and  No.  20 

Rail  Bound  Manganese 

Steel  Frogs. 
Solid  Manganese  Steel  Self 

Guarded  Frogs. 
Solid  Manganese  Steel  Frogs. 

Applications  of  AREA  Cross- 
ing Designs  and  Recom- 
mended Practices. 


Supersedes  Plans  Nos.  600,  re- 
vised 1938,  and  600-A,  re- 
vised 1934. 

Reissue  of  Plan  600-B,  adopted 
1934. 

Supersedes  Plan  No.  608,  re- 
vised 1937. 

Supersedes  Plan  No.  601-3,  re- 
vised 1937. 

Supersedes  Plans  Nos.  609,  re- 
vised 1937,  and  604-5,  revised 
1937. 

Supersedes  Plans  Nos.  609,  re- 
vised 1937,  and  610,  revised 
1937. 

Supersedes  Plans  Nos.  606-7,  re- 
vised 1937,  and  610,  revised 
1937. 

Supersedes  Plan  No.  640,  re- 
vised 1938. 

Supersedes  Plan  670,  revised 
1938. 

Supersedes  Plan  No.  700,  re- 
vised 1934. 


598 


Track 


Plan  No. 

Title 

Bolted  Rail  Crossings 

701-40 

Bolted  Rail  Crossings,  Angles 

90°  to  50°  incl.  Three-Rail 

Design. 

702-41 

Bolted  Rail  Crossings,  Angles 

90°  to  50°  incl.  Two-Rail 

Design. 

703-41 

Bolted  Rail  Crossings,  Angles 

Below  50°  to  35°  incl.  Three 

Rail  Design. 

704-41 

Bolted  Rail  Crossings,  Angles 

Below  50°  to  35°  incl.  Two- 

Rail  Design. 

705-41 

Bolted  Rail  Crossings,  Angles 

Below  35°  to  25°.  incl. 

Three-Rail  Design. 

706-41 

Bolted  Rail  Crossings,  Angles 

Below  35°  to  25°  incl.  Two- 

Rail  Design. 

708-41 

Bolted  Rail  Crossings,  Angles 

Below  25°  and  Above  14° 
15'. 
Bolted  Rail  Crossings,  Angles 

710-41 

14°  15'  to  8°  10'  incl. 

Remarks 


Supersedes  Plan  No.  701,  re- 
vised 1934. 

Supersedes  Plan  No.  702,  re- 
vised 1934. 

Supersedes  Plan  No.  703,  re- 
vised 1934. 

Supersedes  Plan  No.  704,  re- 
vised 1934. 

Supersedes  Plan  No.  705,  re- 
vised 1934. 

Supersedes  Plan  No.  706,  re- 
vised 1934. 

Supersedes  Plans  Nos.  707  and 
708,  revised  1934. 

Supersedes  Plans  Nos.  709  and 
710,  revised  1934. 


Manganese  Insert  Crossings 


751-40 

755-41 

757-41 

761-41 
768-41 


Design  and  Dimensions  of 
Manganese  Steel  Inserts  for 
Crossings,  of  Angles  from  14' 
15'  to  45°  0'. 

Manganese  Steel  Insert  Cross- 
ings, Angles  45°  to  35°,  incl. 

Manganese  Steel  Insert  Cross- 
ings, of  Angles  below  35°  to 
25°,  incl. 

Manganese  Steel  Insert  Cross- 
ings, of  Angles  below  25° 
and  above  14°  15'. 

Manganese  Steel  Insert  Cross- 
ings, Angles  14°  15'  to  8° 
10',  incl. 


Supersedes  Plan  No.  751,  re- 
vised 1934. 


Supersedes  Plan  No.  755,  re- 
vised 1934. 

Supersedes  Plan  No.  757,  re- 
vised 1934. 

Supersedes  Plan  No.  761,  re- 
vised 1935. 

Supersedes  Plans  Nos.  753,  re- 
vised 1934,  and  768,  revised 
1935. 


Solid  Manganese  Crossings 


771-40 
772-40 

773-40 
774-41 

775-41 


Supersedes  Plan  No.  771,  re- 
vised 1934. 

Supersedes  Plan  No.  772,  re- 
vised 1934. 


Solid  Manganese  Steel  Cross- 
ings, Angles  90°  to  60°,  incl. 

Solid  Manganese  Steel  Cross- 
ings, Angles  below  60°  to  40°, 
incl. 

Solid  Manganese  Steel  Cross- 
ings, Angles  40°  to  25°,  incl. 

Crossings  with  Solid  Mangan- 
ese Steel  Frogs  and  Interior 
Rolled  Closure  Rails,  Angles 
below  25°  and  above  14°  15', 
Single-Rail  Construction. 

Crossings  with  Solid  Mangan-     Supersedes  Plan  775,  revised 
ese  Steel  Frogs  and  Interior        1939. 
Rolled  Closure  Rails,  Angles 
14°  15'  to  8°  10',  incl.,  Single- 
Rail  Construction. 


Supersedes  Plan  No.  773,  re- 
vised 1934. 

Supersedes  Plan  No.  774,  re- 
vised 1939. 


Track 


S99 


Plan  No. 
776-40 


777-40 


780-40 


781-40 


790-34 
791-34 
792-34 
793-40 


Title 

Solid  Manganese  Steel  Cross- 
ings, Steam  Railroad  over 
Electric  Railway,  Angles 
90°  to  60°,  incl. 

Solid  Manganese  Steel  Cross- 
ings, Steam  Railroad  over 
Electric  Railway.  Angles 
below  60°  to  40°,  incl. 

Solid  Manganese  Steel  Cross- 
ings for  7"  and  9"  Girder 
Rails,  Angles  90°  to  60°, 
incl.,  for  Steam  Railroad 
over  Electric  Railway  and 
for  Steam  Railroad  Tracks 
both  ways. 

Solid  Manganese  Steel  Cross- 
ings for  7"  and  9"  Girder 
Rails,  Angles  below  60°  to 
40°,  incl.,  for  Steam  Rail- 
road over  Electric  Railway 
and  for  Steam  Railroad 
Tracks  both  ways. 

Data  for  Gages  and  Flange- 
ways  at  Frogs  and  Crossings. 

Data  for  Gages  and  Flange- 
ways  in  Curved  Track. 

Data  for  Gages  and  Flange- 
ways  in  Curved  Track. 

Data  Sheet  for  AAR  Standard 
Wheel  Flanges,  Treads  and 
Gages. 


Turnout  and  Crossover  Data 


910-41 
911-41 

912-41 
920-41 
921-41 


Turnout  and  Crossover  Data 
for  Straight  Split  Switches. 

Location  of  Joints  for  Turn- 
outs with  Straight  Split 
Switches. 

Bills  of  Timber  for  Turnouts 
and  Crossovers. 

Turnout  and  Crossover  Data 
for  Curved  Split  Switches. 

Location  of  Joints  for  Turn- 
outs with  Curved  Split 
Switches. 


Remarks 
Supersedes  Plan  No.  776,  re- 
vised 1934. 


Supersedes  Plan  No.  777,  re- 
vised 1934. 


Supersedes  Plan  No.  780,  re- 
vised 1934, 


Supersedes  Plan  No.  781,  re- 
vised 1934. 


Reissue  of  Plan  No.  790,  re- 
vised 1934. 

Reissue  of  Plan  No.  791,  re- 
vised 1934. 

Reissue  of  Plan  No.  792,  re- 
vised 1934. 

Supersedes  Plan  No.  793,  re- 
vised 1935. 


Supersedes  Plan  No.  900,  re- 
vised 1934. 

Supersedes  in  part  Plans  Nos. 
901  to  908  incl.,  revised  1934. 

Supersedes  in  part  Plans  Nos. 

901  to  908  incl.,  revised  1934. 
Supersedes  Plan  No.  920, 

adopted  1938. 
Supersedes   Plans   Nos.   124-A, 

124-B,  126-A,  126-B,  adopted 

1938, 128,  revised  1938. 


Track  Construction  for  Paved  Streets 


980-34 
982-34 

983-35 
984-35 


Reissue  of  Plan  980,  revised 
1934. 


Reissue  of  Plan  No.  982,  re- 
vised 1934. 


Alinement  Details  for  Turn- 
outs, Tongue-Switch  Con- 
struction 

200-ft.  Radius  Tongue  Switch 
and  Mate,  Solid  Manganese 
Steel,  for  7"  and  9"  Girder 
Rails. 

Solid  Manganese  Steel  Frogs      Reissue  of  Plan  No.  983,  re- 
for  7"  and  9"  Girder  Rails.         vised  1934. 

Nos.  4  and  5  Frogs,  Iron  Reissue  of  Plan  No.  984,  re- 

Bound  Manganese  Steel  Cen-     vised  1934. 
ter,  for  7"  and  9"  Girder  Rail. 


600 


Track 


Plan  No. 
985-35 


986-35 
987-34 

988-34 


Title  Remarks 

Nos.  6  and  8  Frogs,  Iron  Reissue  of  Plan  No.  985,  re 

Bound  Manganese  Steel  Cen-     vised  1934. 

ter,  for  7"  and  9"  Girder 

Rails. 
No.  10  Frog,  Iron  Bound 

Manganese  Steel  Center,  for 

7"  and  9"  Girder  Rails. 
Straight  Double  Tongue 

Switches,  For  Engine  Wheel 

Base  not  over  14'  6",  Solid 

Manganese  Steel,  7"  and  9" 

Girder  Rails. 
Straight  Double  Tongue 

Switches,  For  Engine  Wheel 

Base  over  14'  6",  but  not 

Exceeding  19'  0",  Solid 

Manganese  Steel,  7"  and 

9"  Girder  Rails. 


Reissue  of  Plan  986,  revised 
1934. 

Reissue  of  Plan  No.  987,  re- 
vised 1934. 


Reissue  of  Plan  No.  988,  re- 
vised 1934. 


Data  for  Rail  Sections,  Etc. 


Revision  of  Plan  No.  1001  as  re- 
vised 1934. 

Revision  of  Plan  No.  1002  as  re- 
vised 1934. 

Revision  of  Plan  No.  1003  as  re- 
vised 1934. 

Revision  of  Plan  No.  1004  as  re- 
vised 1934. 

Supersedes  data  in  Appendix  A, 
Section  36A,  adopted  1938. 


In  view  of  the  issuance  of  the  plans  listed  above,  the  committee  recommends  with- 
drawal of  the  following  plans  from  the  PortfoHo: 


1001-40* 

Data  for  Tee-Rail  Sections. 

1002-40* 

Girder  Rail  Sections. 

1003-40* 

Data  Sheet  for  AREA  Girder 

Grooved  Rails,  Girder  Guard 

Rails  and  Plain  Girder  Rails. 

1004-40* 

Data  for  Head-Free  Rail 

Sections. 

1005-40 

Beveling  of  Rail  Ends  for 

Special  Trackwork. 

103  Revised  1938       11'  0"  Split  Switch  with 

Uniform  Risers. 

104  Revised  1938       11'  0"  Split  Switch  with 

Graduated  Risers. 

105  Revised  1938      22'  0"  Split  Switch  with 

Uniform  Risers. 

106  Revised  1938      22'  0"  Split  Switch  with 

Graduated  Risers. 

107  Revised  1938      30'  0"  Split  Switch  with 

Uniform  Risers. 

108  Revised  1938       30'  0"  Split  Switch  with 

Graduated  Risers. 
111-40  16'  6"  Straight  Split  Switch 

with  Uniform  Risers. 
112-40  16'  6"  Straight  Split  Switch 

with  Graduated  Risers. 
121  Adopted  1939      11'  0"  Curved  Split  Switch 

with  Uniform  Risers. 
123  Adopted  1938      19'  6"  Curved  Split  Switch 

with  Uniform  Risers. 
124A  Adopted  1938  Location  of  Joints  for  No.  7 

and  No.  8  Turnouts  with 

19'  6"  Curved  Switches. 


Superseded  by  Plan  No.  113-41. 
Superseded  by  Plan  No.  114-41. 
Superseded  by  Plan  No.  115-41. 
Superseded  by  Plan  No.  116-41. 
Superseded  by  Plan  No.  117-41. 
Superseded  by  Plan  No.  118-41. 
Superseded  by  Plan  No.  111-41. 
Superseded  by  Plan  No.  112-41. 
Superseded  by  Plan  No.  121-41. 
Superseded  by  Plan  No.  123-41. 
Superseded  by  Plan  No.  921-41. 


*  These  drawings  are  sheets  of  information  rather  than  recommended  practice. 


Track 


601 


Plan  No. 

124B  Adopted  1938 

125  Adopted  1938 
126A  Adopted  1938 

126B  Adopted  1938 

127  Adopted  1937 

128  Revised  1938 

140  Adopted  1938 

201  Revised  1934 

202  Revised  1934 

203  Revised  1934 

204  Revised  1934 

205  Revised  1934 

206  Revised  1934 

207  Revised  1934 

208  Revised  1934 

209  Revised  1938 

210  Revised  1934 

211  Revised  1935 


Title 

Location  of  Joints  for  No.  9, 
No.  10  and  No.  11  Turnouts 
with  19'  6"  Curve  Switches. 

30'  0"  Curved  Split  Switch 
with  Uniform  Risers. 

Location  of  Joints  for  No.  12 
and  No.  14  Turnouts  with 
30'  0"  Curved  Switches. 

Location  of  Joints  for  No.  15 
and  No.  16  Turnouts  with 
30'  0"  Curved  Switches. 

39'  0"  Curved  Split  Switch 
with  Uniform  Risers. 

Location  of  Joints  for  No.  18 
and  No.  20  Turnouts  with 
39'  0"  Curved  Switches, 

Method  of  Beveling  Heel  End 
and  Round  Stock  Rail  Side 
of  Split  Switch  Points. 

Split  Switch  Fixtures  for 
Medium  Weight  Rails. 

Split  Switch  Fixtures  for 
Medium  Weight  Rails. 

Split  Switch  Fixtures  for 
Medium  Weight  Rails,  Heel 
and  Turnout  Plates  for  16'  6 
and  11'  0"  Split  Switches. 

Split  Switch  Fixtures  for 
Medium  Weight  Rails,  Heel 
and  Turnout  Plates  for  22'  0" 
and  30'  0"  Split  Switches. 

Split  Switch  Fixtures  for 
Heavy  Rails.  (General) 

Split  Switch  Fixtures  for 
Heavy  Rails. 

Split  Switch  Fixtures  for 
Heavy  Rails,  Heel  and 
Turnout  Plates  for  16'  6" 
and  11 '0"  Split  Switches. 

Split  Switch  Fixtures  for 
Heavy  Rails,  Heel  and 
Turnout  Plates  for  22'  0" 
and  30'  0"  Split  Switches. 

Numerical  and  Classified 
Index  of  Detail  Numbers 
Covering  Switch  Fittings. 

Bills  of  Material  for  11'  0" 
and  16'  6"  Split  Switches. 

Bills  of  Material  for  22'  0" 
and  30'  0"  Split  Switches. 


213  Revised  1934       Details  for  Split  Switch  Point 

Derail. 
215  Adopted  1937      Split  Switch  Details  for 

Heavy  and  Medium  Weight 

Rails. 
222-40  Adopt'd  1940  Switch  Rods  and  Clips. 
240  Revised  1935       Specifications  for  Adjustable 

Rail  Braces. 
251  Revised  1934       Requisites,  Including  Connect- 

Rods  for  Switch  Stands. 


Remarks 
Superseded_by  Plan  No.  921-41. 

Superseded  by  Plan  No.  125-41. 
Superseded  by  Plan  No.  921-41. 

Superseded  by  Plan  No.  921-41. 

Superseded  by  Plan  No.  127-41. 
Superseded  by  Plan  No.  921-41. 

Superseded  by  Plan  No.  221-40. 


Superseded  by  Plans  Nos. 

221-40,  222-41,  223-40. 
Superseded  by  Plans  Nos. 

221-40,  222-41,  223-40. 
Superseded  by  Plans  Nos. 

111-41,  113-41,  223-40. 


Superseded  by  Plans  Nos. 
115-41,  117-41,  223-40. 


Superseded  by  Plans  Nos. 

221-40,  222-41,  223-40. 
Superseded  by  Plans  Nos. 

222-41,  223-40. 
Superseded  by  Plans  Nos. 

111-41,  113-41,  223-40. 


Superseded  by  Plans  Nos. 
115-41,  117-41,  223-40. 


Superseded  by  Plan  No.  209-41. 


Superseded  by  Plans  Nos. 

111-41,  112-41,  113-41, 

114-41. 
Superseded  by  Plans  Nos. 

115-41,  116-41,  117-41, 

118-41. 
Superseded  by  Plan  No.  213-41. 

Superseded  by  Plans  Nos. 
221-40,  224-40. 

Superseded  by  Plan  No.  222-41. 
Superseded  by  Plan  No.  224-40. 

Superseded  by  Plan  No.  251-41. 


602 


Track 


Plan  No. 

252  Revised  1934 

253  Revised  1934 

254  Revised  1934 

256  Revised  1934 

257  Revised  1934 

258  Revised  1938 

259  Revised  1938 

260  Revised  1938 

261  Revised  1938 

262  Revised  1938 

278  Revised  1938 

279  Revised  1938 

281  Revised  1938 

282  Revised  1938 

283  Revised  1938 

291  Revised  1938 

292  Revised  1938 

320  Revised  1938 

401  Revised  1934 

404  Revised  1934 

405  Adopted  1939 
600  Revised  1938 
600A  Revised  1934 


Title 
Detail  of  Lamp  Tips  for 

Switch  Stands. 
Detail  of  Switch  Stand 

Target  Shapes. 
Day  Target  Discs  for  Switch 

Lamps. 
No.  4  Frogs  for  Medium  Weight  Withdrawn. 

Rails,  Angle  14°  15' 00". 
No.  5  Frogs  for  Medium  Weight  Withdrawn. 

Rails,  Angle  11°  25'  16". 
No.  6  Frogs  for  Medium  Weight  Withdrawn. 

Rails,  Angle  9°  31'  38". 
No.  7  Frogs  for  Medium  Weight  Withdrawn. 

RaUs,  Angle  8°  10'  16". 
No.  8  Frogs  for  Medium  Weight  Withdrawn. 

Rails,  Angle  7°  9'  10". 
No.  9  Frogs  for  Medium  Weight  Withdrawn. 

Rails,  Angle  6°  21'  35". 
No.  10  Frogs  for  Medium  Withdrawn. 

Weight  Rails,  Angle  5°  43' 

29". 
No.  1 1  Frogs  with  Uniform  Tie    Withdrawn. 

Spacing,  For  Heavy  and 

Medium  Weight  Rails,  Angle 

5°  12'  18". 
No.  12  Frogs  with  Uniform  Tie    Withdrawn. 

Spacing,  for  Heavy  and  Med- 
ium Weight  Rails,  Angle 

4°  46' 19". 
No.  14  Frogs  with  Uniform  Tie    Withdrawn. 

Spacing,  for  Heavy  and  Med- 
ium Weight  Rails,  Angle 

4°  5' 27". 
No.  15  Frogs  with  Uniform  Tie    Withdrawn. 

Spacing,  for  Heavy  and  Med- 
ium Weight  Rails,  Angle 

3°  49' 6". 
No.  16  Frogs  with  Uniform  Tie    Withdrawn. 

Spacing,  for  Heavy  and  Med- 
ium Weight  Rails,  Angle 

3°  34' 47". 
No.  18  Frogs  with  Uniform  Tie    Withdrawn, 

Spacing,  for  Heavy  and  Med- 
ium Weight  Rails,  Angle 

3° 10' 56". 
No.  20  Frogs  with  Uniform  Tie  Withdrawn. 

Spacing,  for  Heavy  and  Med- 
ium Weight  Rails,  Angle 

2° 51' 51". 
Data  and  Sections,  Bolted 

Rigid  Frogs. 
No.  10  Spring  Rail  Frog. 
No.  10  Spring  Rail  Frog  with 

Uniform  Tie  Spacing. 
No.  10  Spring  Rail  Frog; 

Short  Spring  Rail  Type. 
Data  and  Sections  for  Rail 

Bound  Manganese  Steel  Frogs. 
Application  of  Wing  Wheel         Superseded 

Risers  to  Manganese  Steel  plans. 

Frogs. 


Remarks 
Superseded  by  Plan  No.  251-41. 


Superseded  by  Plan  No.  251-41. 
Superseded  by  Plan  No.  251-41. 


Superseded  by  Plan  No.  320-41. 


Superseded 
Superseded 


by  Plan  No.  401-41. 
by  Plan  No.  401-41. 


Superseded  by  Plan  No.  405-41. 
Superseded  by  Plan  No.  600-41. 
by  various  other 


Track 


603 


Plan  No.  Title  Remarks 

601-3  Revised  1937  No.  6,  No.  7  and  No.  8  Rail       Superseded  by  Plan  No.  612-41. 

Bound  Manganese  Steel  Frogs, 

for  Heavy  and  Medium 

Weight  Rails. 
604-5  Revised  1937  No.  10  and  No.  11  Rail  Bound  Superseded  by  Plan  No.  613-41. 

Manganese  Steel  Frogs,  for 

Heavy  and  Medium  Weight 

Rails. 

606-7  Revised  1937  No.  16  and  No.  20  Rail  Bound  Superseded  by  Plan  No.  615-41. 
Manganese  Steel  Frogs,  for 
Heavy  and  Medium  Weight 
Rails. 


608  Revised  1937 


609  Revised  1937 


610  Revised  1937 


No.  4  and  No.  5  Rail  Bound      Superseded  by  Plan  No.  611-41. 

Manganese  Steel  Frogs,  for 

Heavy  and  Medium  Weight 

Rails. 
No.  9,  No.  12  and  No.  14  Rail  Superseded  by  Plans  Nos. 

Bound  Manganese  Steel  613-41,  614-41. 

Frogs,  for  Heavy  and  Medium 

Weight  Rails. 
No.  15  and  No.  18  Rail  Bound     Superseded  by  Plans  Nos. 

Manganese  Steel  Frogs,  for         614-41,  615-41. 

Heavy  and  Medium  Weight 

Rails. 


640-40  Revised  1938  Data  and  Sections  for  Solid 
Manganese  Steel  Self 
Guarded  Frogs. 

Data  and  Sections  for  Solid 
Manganese  Steel  Frogs. 

Crossing  Designs  and 
Recommended  Practices. 

Data  and  Record  Sheet  for 
Ordering  Crossings. 


670-40  Revised  1938 
700  Revised  1935 
700A  Revised  1934 


Superseded  by  Plan  No.  640-41. 


Superseded  by  Plan  No.  670-41. 
Superseded  by  Plan  No.  700-41. 
Superseded  by  Plan  No.  700-41. 


700A  Example  1 
Revised  1934 

700A  Example  2 
Revised  1934 

702  Revised  1934 


703  Revised  1934 

704  Revised  1934 

705  Revised  1934 

706  Revised  1934 

707  Revised  1934 


Data  and  Record  Sheet  for 
Ordering  Crossings. 

Data  and  Record  Sheet  for 
Ordering  Crossings. 

Bolted  Rail  Crossings, 
Angles  90°  to  50°,  Inch, 
Two  Rail  Design. 

Bolted  Rail  Crossings,  Angles 
below  50°  to  35°,  inch.  Three 
rail  Design. 

Bolted  Rail  Crossings,  Angles 
Below  50°  to  35°,  incl.,  Two- 
Rail  Design. 

Bolted  Rail  Crossings,  Angles 
Below  35°  to  25°,  incl., 
Three-Rail  Design. 

Bolted  Rail  Crossings,  Angles 
Below  35°  to  25°,  incl.. 
Two  Rail  Design. 

Bolted  Rail  Crossings,  Angles 
Below  25°  and  Above  14°  1 5', 
Single-Rail  Design  and  Two- 
Rail  Design,  With  Short 
Easer  Rails. 


Superseded  by  Plan  No.  700-41. 

Superseded  by  Plan  No.  700-41. 
Superseded  by  Plan  No.  702-41. 

Superseded  by  Plan  No.  703-41. 

Superseded  by  Plan  No.  704-41. 

Superseded  by  Plan  No.  705-41. 

Superseded  by  Plan  No.  706-41. 

Superseded  by  Plan  No.  708-41. 


604 


Track 


Plan  No. 

708  Revised  1934 


709  Revised  1934 

710  Revised  1934 

716  Revised  1934 

717  Revised  1934 

753  Revised  1934 

754  Revised  1934 

755  Revised  1934 

756  Revised  1934 

757  Revised  1934 

758  Revised  1934 

759  Revised  1934 

760  Revised  1935 

761  Revised  1935 
767  Revised  1935 


Remarks 

by  Plan  No.  708-41. 


by  Plan  No.  710-41. 
by  Plan  No.  710-41. 


Withdrawn. 


Title 
Bolted  Rail  Crossings,  Angles     Superseded 

Below  25°  and  Above  14°  15', 

Single-Rail  Design  and  Two- 
Rail  Design. 
Bolted  Rail  Crossings,  Angles     Superseded 

14°  15'  to  8°,  incL,  Single-Rail 

Design  and  Two-Rail  Design 

with  Short  Easer  Rails. 
Bolted  Rail  Crossings,  Angles     Superseded 

14°  15' to  8°  10' inch,  Single- 
Rail  Design  and  Two-Rail 

Design. 
Bolted  Rail  Crossings,  Steam     Withdrawn. 

Railroad  over  Electric  Rail- 
way, Angles  90°  to  50°,  incl. 
Bolted  Rail  Crossings,  Steam     Withdrawn. 

Railroad  over  Electric  Rail- 
way, Angles  Below  50°  to 

30°,  incl. 
Manganese  Steel  Insert  Cross-   Superseded  by  Plan  No.  768-41 

ings.  Designs  and  Dimensions 

of  Manganese  Steel  Inserts, 

for  Angles  8°  10' to  14°  15', 

incl. 
Manganese  Steel  Insert  Cross- 
ing, Angle  Below  45°  to  35°, 

incl. — Detail  A,  Three-Rail 

Design. 
Manganese  Steel  Insert  Cross-  Superseded  by  Plan  No.  755-41 

ing,  Angle  Below  45°  to  35°, 

incl. — Detail  A,  Two-Rail 

Design. 
Manganese  Steel  Insert  Cross-  Withdrawn. 

ing,  Angle  Below  35°  to  25°, 

incl.— Detail  A,  Three-Rail 

Design. 
Manganese  Steel  Insert  Cross-   Superseded  by  Plan  No.  757-41 

ing.  Angle  Below  35°  to  25°, 

incl.— Detail  A,  Two-Rail 

Design. 
Manganese  Steel  Insert  Cross 

ing,  Angle  Below  25°  and 

Above  14°  15'— Detail  A, 

Two-Rail  Design,  With 

Short  Easer  Rails. 
Manganese  Steel  Insert  Cross-  Withdrawn 

ing.  Angle  Below  25°  and 

Above  14°  15'— Detail  A, 

Two-Rail  Design. 
Manganese  Steel  Insert  Cross-  Withdrawn 

ing,  Angle  Below  25°  and 

Above  14°  15'— Detail  A, 

Single-Rail  Design,  With 

Short  Easer  Rails. 
Manganese  Steel  Insert  Cross- 
ing, Angle  Below  25°  and 

Above  14°  15'— Detail  A, 

Single-Rail  Design. 
Manganese  Steel  Insert  Cross- 
ing, Angle  14°  15'  to  8°  10', 

incl.,  Two-Rail  Design. 


Withdrawn. 


Superseded  by  Plan  No.  761-41. 


Withdrawn. 


Track 


60S 


Plan  No. 

768  Revised  1935 

770  Revised  1934 

774  Revised  1939 

775  Revised  1939 


900  Revised  1934 

901  Revised  1934 

902  Revised  1934 

903  Revised  1934 

904  Revised  1934 

905  Revised  1934 

906  Revised  1934 

907  Revised  1934 

908  Revised  1934 
920  Adopted  1938 


Remarks 
Superseded  by  Plan  No.  768-41. 

Withdrawn. 


Title 
Manganese  Steel  Insert  Cross- 
ing, Angle  14°  15'  to  8°  10', 

incl.,  Single-Rail  Design. 
Insulated  Internal  Joint  for 

Crossings — Three-Rail 

Design,  Angle  45°  to  25°, 

incl. 
Crossing  with  Solid  Manganese  Superseded  by  Plan  No.  774-41. 

Steel  Frogs  and  Interior 

Rolled  Closure  Rails.  Angles 

below  25°  0'  and  above  14° 

15'.  Single-Rail  Construction. 
Crossing  with  Solid  Manganese  Superseded  by  Plan  No.  775-41. 

Steel  Frogs  and  Interior 

Rolled  Closure  Rails.  Angles 

14°  15'  to  8°  10',  incl.  Single- 
Rail  construction. 


Tables  of  Turnout  Leads  and 
Other  Turnout  Data. 

Typical  Layout,  No.  6  Turn- 
out and  Crossover. 

Typical  Layout,  No.  7  Turn- 
out and  Crossover. 

Typical  Layout,  No.  8  Turn- 
out and  Crossover. 

Typical  Layout,  No.  9  Turn- 
out and  Crossover. 

Typical  Layout,  No.  10  Turn- 
out and  Crossover. 

Typical  Layout,  No.  11  Turn- 
out and  Crossover. 

Typical  Layout,  No.  16  Turn- 
out and  Crossover. 

Typical  Layout,  No.  20  Turn- 
out and  Crossover. 

Turnout  Data  for  Curved 
Switches. 


Superseded  by  Plan  No.  910-41. 


Superseded  by 

911-41,  912- 
Superseded  by 

911-41,  912- 
Superseded  by 

911-41,  912- 
Superseded  by 

911-41,  912- 
Superseded  by 

911-41,  912- 
Superseded  by 

911-41,  912- 
Superseded  by 

911-41,  912- 
Superseded  by 

911-41,  912- 
Superseded  by 


Plans  Nos. 

41. 

Plans  Nos. 

41. 

Plans  Nos. 

41. 

Plans  Nos. 

41. 

Plans  Nos. 

41. 

Plans  Nos. 

41. 

Plans  Nos. 

41. 

Plans  Nos. 

41. 

Plan  No.  920-41. 


Report  on  Assignment  5 

Corrosion  of  Rail  and  Fastenings  in  Tunnels 
Collaborating  with  Committee  4 — Rail 

A.  E.  Perlman  (chairman,  subcommittee),  W.  H.  Bettis,  O.  U.  Cook,  L.  W.  Deslauriers, 
S.  H.  Poore,  G.  M.  Strachan,  Hermann  von  Schrenk. 

The  subcommittee  has  continued  its  study  in  the  laboratory  and  the  field  to  deter- 
mine methods  for  the  control  of  corrosion  of  rail  and  fastenings  in  tunnels.  This  year's 
study  has  been  of  various  commercial  alloys,  zinc  spray,  galvanized  products,  and  other 
resistant  coatings. 

The  study  leads  to  the  following  conclusions: 

1.  No  practical,  or  economical  corrosion  resistant  alloy  has  been  found  because  the 
materials  tested  depend  upon  a  protecting  film  of  corrosion  products  for  their  resistance. 
This  protecting  film  naturally  cannot  be  maintained  on  the  running  surface  of  the  rail. 


606 Track 

The  initial  corrosion   rates  of  all   ferrous  alloys,  excepting  the   18-8  stainless  steel,  are 
practically  the  same. 

2.  Zinc  metal  spray  or  galvanizing  is  the  best  means  of  protecting  angle  bars,  bolts, 
spikes,  etc.,  since  zinc  is  not  rapidly  corroded  by  the  tunnel  gases. 

3.  Galvanic  action  of  zinc,  plated  or  sprayed  on  the  sides  of  the  rail  head,  is  not 
sufficient  to  offer  any  noticeable  protection  to  the  running  surface. 

4.  Neutralization  of  the  corrosive  elements  in  stack  gases  cannot  be  accomplished  b\ 
practical  means. 

5.  One  means  of  increasing  life  of  rail  in  tunnels  would  be  to  roll  a  special  rail  sec- 
tion with  more  metal  in  the  head  by  increasing  the  height  of  the  rail  head.  This  would 
allow  for  more  metal  to  be  lost  from  the  running  surface  before  replacement  is  neces- 
sary. The  remainder  of  the  rail,  and  fastenings,  could  be  sprayed  with  zinc  or  a  similar 
coating  to  give  protection. 

6.  The  annual  penetration  of  the  running  surface  in  the  Moffat  tunnel,  where  tests 
were  conducted,  is  0.08  of  an  inch  per  year. 

7.  The  only  solution  to  the  problem  of  corrosion  of  the  rail  and  fastenings  in  tun- 
nels because  of  steam  operation  is  to  change  to  either  electric  or  Diesel  operation.  With 
Diesel  power,  special  control  of  the  corrosion  elements  in  the  fuel  oil  is  required. 


This  report  is  submitted  as  information  with  the  recommendation  that  the  subject 
be  discontinued. 


Report  on  Assignment  7 

Practicability  o£  Using  Reflex  Units  for  Switch  Lamps  and  Targets 

L.  L.  Adams  (chairman,  subcommittee),  F.  J.  Bishop,  J.  F.  Shaffer,  I.  H.  Schram,  G.  L. 
Sitton,  M.  J.  T.  Zeeman. 

Reports  on  this  subject  were  made  in  1933  and  1939.  In  1933  only  three  railroads 
reporting  had  an  appreciable  number  of  units  in  service,  while  in  1939  this  number  had 
increased  to  thirteen.  No  questionnaire  was  sent  out  this  year  to  determine  if  there 
had  been  any  increase  in  this  number,  but  information  secured  in  an  informal  manner 
indicates  that  the  use  of  reflex  units  for  switch  lamps  and  targets  is  being  extended  on 
roads  that  had  them  in  use  in  1939  and  also  the  number  of  roads  using  them  has  in- 
creased. One  road  that  reported  1,250  units  in  service  in  1938  now  reports  3,100.  This 
road  has  also  extended  the  use  of  reflex  units  to  caution  and  resume  speed  signs  for 
protecting  slow  orders  at  night. 

There  are  certain  states  that  have  laws  which  might  prohibit  the  use  of  reflex  units 
for  switch  lamps.  The  following  states  have  such  laws: 

Arkansas. — Statutes  read:  "Switch  Lights:  Any  company,  corporation  or  officer  of 
court  or  any  person  or  persons  operating  any  line  of  railroad  during  the  night  time  in 
this  state  shall  be  required  to  place  and  maintain  sufficient  lights  during  the  night  time 
on  all  its  main  line  switches  of  the  line  of  railroad  so  operated,  and  of  the  color  green 
indicating  main  line  and  red  to  indicate  side  tracks.  Act  February   10,   1911. 

Penalty:  Any  company,  corporation  or  officer  of  court  or  any  person  or  persons 
operating  any  railroad  in  this  state,  who  shall  violate  any  of  the  provisions  of  this  act, 
shall  be  liable  on  conviction  to  a  penalty  of  a  fine  of  not  less  than  twenty-five  dollars 


Track 607 

nor  more  than  one  hundred  dollars  for  each  separate  offense,  which  penalty  shall  be 
recovered  in  a  civil  action  in  the  name  of  the  state." 

Colorado. — Any  railroad,  or  railroad  company,  owning  or  operating  within  this 
state  any  line  or  branch  of  railroad  connecting  with  any  main  line  of  railroad  by  means 
of  a  switch,  shall  provide  such  switch  with  a  suitable  light,  such  as  is  commonly  used 
for  such  purpose,  and  shall  keep  the  same  lighted  from  sunset  on  each  and  every 
calendar  day  of  the  year,  until  sunrise  of  the  following  day. 

Authority  is  vested  in  the  Public  Utilities  Commission  of  the  State  of  Colorado  to 
permit  or  order  substitution  of  reflex  lenses  for  switch  lights  after  a  hearing  on  petition 
or  on  its  own  motion. 

Indiana.- — Requires  maintenance  of  switch  and  derail  lights. 

Kansas. — It  shall  be  the  duty  of  any  person,  firm  or  corporation  or  receiver,  owning 
or  operating  any  railroad,  in  whole  or  in  part,  in  the  State  of  Kansas,  to  keep  and 
maintain  in  good  condition,  switch  lights  on  all  main  line  switch  stands,  except  where 
automatic  block  signals  are  used,  where  such  automatic  block  signals  are  so  located  as  to 
answer  the  purpose  of  switch  lights,  and  to  keep  all  lights  controlling  the  movement  of 
trains  on  the  main  line  burning  from  sunset  to  sunrise:  Provided,  this  act  shall  not 
apply  to  branch  lines,  where  trains  are  not  regularly  operated  at  night,  or  in  cases 
where  the  lights  have;  been  properly  lighted,  but  have  failed  for  causes  beyond  the 
control  of  the  company  and  it  has  not  had  reasonable  time  to  relight  them. 

Massachusetts. — Required  to  notify  Public  Service  Commission  of  intention  to 
install  interlocking  block  or  special  signals. 

Michigan. — From  wording  of  act  it  is  apparent  that  burning  lights  must  be  provided. 

Missouri. — All  common  carriers,  their  officers,  agents  and  employees,  operating  any 
railroad  or  part  of  railroad  in  this  state,  are  hereby  required  on  or  before  the  1st  day  of 
June  1915,  to  adopt,  put  in  use  and  maintain  lights  between  sunset  and  sunrise,  on 
main  line  switches,  and  all  lead  switches  in  yards,  where  cars  are  switched  in  making  up 
or  breaking  up  of  trains.  Provided  that  this  law  shall  not  include  branch  lines  where 
trains  do  not  operate  at  night,  or  independent  lines  of  less  than  SO  miles  in  length.  Pro- 
vided further,  that  the  provisions  of  this  section  shall  not  apply  to  trailing  point  switches 
on  double  track. 

Nebraska. — Every  person,  firm,  corporation,  lessee  or  receiver  of  any  railroad  engaged 
in  the  business  of  transportation  in  this  state  shall  equip  with  proper  lights  all  switch 
stands  to  each  and  every  switch  leading  from  all  main  tracks  of  any  such  road,  on  which 
trains  generally  are  operated  at  night;  except  lines  fully  equipped  with  automatic  block 
signals.  The  lights  upon  such  switch  stands  shall  be  kept  in  good  condition  constantly, 
and  shall  be  lighted  and  kept  burning  between  the  time  of  sundown  and  sunrise  and  at 
such  other  times,  when  by  reason  of  excessively  foggy  weather  the  condition  of  such 
lights  or  signals  would  render  it  unsafe  for  the  employees  of  such  railroad  company  and 
for  the  general  public. 

South  Dakota. — Switch  lights  required:  Civil  penalty.  It  shall  be  the  duty  of  every 
railroad  company  operating  any  line  of  railway  in  this  state  to  maintain  good  and  suffi- 
cient switch  lights  on  all  switches  connected  with  its  main  line,  and  to  keep  the  same 
lighted  from  dark  until  daylight.  Such  lights  shall  be  required  only  on  such  main  line 
switches  over  which  trains  shall  be  operated  between  sunset  and  sunrise. 

Other  states  do  not  have  laws  pertaining  to  switch  lamps. 

No  additional  information  has  developed  that  will  change  or  modify  the  information 
as  published  in  the  Proceedings  for   1939,  Vol.  40,  pages  566,  567. 


This  is  a  progress  report,  submitted  as  information. 


608 


Track 


Report  on  Assignment  9 

Bolt  Tension  Necessary  for  Proper  Supporting  of  Rail  Joints 

C.  W.  Breed  (chairman,  subcommittee),  C.  W.  Baldridge,  A.  L.  Bartlett,  E.  D.  Cowlin, 
L.  W.  Deslauriers,  H.  F.  Fifield,  J.  W.  Fulmer,  F.  S.  Hales,  C.  T.  Jackson,  J.  de  N. 
Macomb,  G.  M.  Magee,  E.  E.  Martin,  W.  A.  Murray,  S.  H.  Poore. 

Your  committee  submits  the  following  report  of  progress  in  the  tension  tests  of 
bolts  installed  in  the  tracks  of  several  railroads,  as  described  in  the  Proceedings  for  1939 
and  1940,  Vol.  40,  page  565,  and  Vol.  41,  page  574. 

Chicago,  Milwaukee,  St.  Paul  &  Pacific 

The  test  installation  on  the  Milwaukee  Railroad  near  Winona,  Minn,  was  described 
in  the  committee  report  given  in  Vol.  40,  page  570.  This  test  section  is  approximately 
J4  mile  in  length.  The  rail  is  112-lb.  RE  section  with  6-hole  toeless  joint  bars  and  1-in. 
track  bolts  without  spring  washers.  The  rail  was  laid  new  June  22,  1938.  In  the  report 
last  year,  Vol.  41,  page  582,  information  was  given  in  Table  4  showing  the  loss  in  bolt 
tension  between  December  2,  1938  and  June  30,  1939,  a  period  of  approximately  7 
months.  The  bolts  on  the  north  rail  were  tightened  to  an  average  of  10,800  lb.,  and  the 

Table  1 

BOLT  THISIOH  LiEAamB'JNTS 
C  U  St.P  &  P  ER  Test  Installation 


NORTH  RAIL 

SOOTH  RAIL 

lTera< 

;e  Bolt  Tension  Per  Joint  -  Lbs. 
Applied       Remaininf^ 

Average 

Bolt  Tension 

Per  Joint  -  Lbs. 

Jt. 

Applied 

Remaining 

No. 

6-30-39 

6-12-40 

Loss 

6-29-59 

6-12-40 

Loss 

1 

10,200 

4,000 

6,200 

14,100 

8,100 

6,000 

2 

11,400 

3,300 

8,100 

12,200 

3,100 

9,100 

3 

8,700 

7,000 

1,700 

23, 200 

12,000 

11,200 

4 

11,800 

6,800 

5,000 

21,100 

10,200 

10,900 

5 

9,700 

9,700 

0 

20,900 

14,100 

6,800 

6 

7,900 

5,  TOO 

2,600 

19,500 

14,  TOO 

5,200 

7 

8,100 

5,400 

2,700 

- 

- 

.  * 

8 

10,300 

7,900 

2,400 

17,500 

11,200 

6,300 

9 

9,500 

6,400 

3,100 

18,900 

11,600 

7,300 

10 

9,300 

6,800 

2,500 

16,600 

11,600 

5,000 

11 

10,300 

7,700 

2,600 

16,800 

9,100 

7,700 

12 

7,700 

4,300 

3,400 

13,400 

9,800 

3,600 

13 

12,100 

7,900 

4,200 

14,800 

6,700 

8,100 

14 

8,300 

4,500 

3,800 

15,600 

11,100 

4,  TOO 

15 

11,500 

8,000 

3,500 

15,600 

6,700 

6,900 

16 

8,fO0 

3,300 

5,200 

13,800 

6,400 

7,400 

17 

9,900 

7,400 

2,500 

17,000 

11,000 

6,000 

18 

10,500 

4,400 

6,100 

14,900 

8,800 

6,100 

19 

10,800 

3,700 

7,100 

18,100 

10,600 

7,500 

20 

11,500 

5,800 

5,700 

18,600 

8,900 

9,700 

21 

11,400 

4,100 

7,300 

17,400 

6,700 

10,700 

22 

10,800 

7,400 

3,400 

14,200 

6,700 

7,  TOO 

23 

9,800 

7,000 

K,800 

15,700 

5,400 

10,  TOO 

24 

10,800 

5,800 

5,000 

14,300 

9,100 

5,200 

25 

8,900 

5,700 

3,200 

16,  TOO 

9,800 

6,  MO 

26 

13,200 

7,600 

5,600 

13,600 

8,400 

5,200 

27 

13,200 

10,100 

3,100 

14,500 

5,100 

9,400 

28 

9,500 

4,900 

4,600 

15,700 

5,000 

10,700 

29 

10,500 

4,800 

5,700 

16,700 

7,400 

9,  TOO 

30 

8,500 

6,800 

1,700 

19 , 200 

8, TOO 

10,900 

31 

10,100 

7,4-00 

2,700 

16,900 

11,100 

5,800 

32 

10,200 

7,100 

5,100 

15,  TOO 

11,000 

4,  TOO 

33 

10,700 

8, 400 

2,300 

19,100 

10,200 

8,900 

34 

3,910 

16,000 
16,5TO 

8,600 
9,0TO 

7,400 

Ave. 

10,170 

6,260 

7,  TOO 

55  Los, 

s  of  Original  Tansion 

Sff/S 

45J5 

♦CroEsing  Plank 

Track 


609 


Westbound    ^ 


ATerago  Change  in  Out-to-Out  Distance  of  Joint  Bars 
C  U  St.P  &  P  Test  Installation 
(From  13-2-38  to  6-12-40) 


NORTH  RAIL 

SOUTH  KAIL 

Location 

Average  Change 
Inches 

Average  Change 
Inches 

A 

.018 

.022 

B 

.023 

.024 

C 

.013 

.021 

D 

.015 

.015 

X 

.008 

.014 

F 

.012 

.008 

Avexaga 


Note:     The  average  chanre  Is  a  decrease  in  out-to-out  distance 
at  the  locations  shown. 

bolt  tension  had  decreased  to  6,400  lb.  in  the  7  months  time.  The  bolts  on  the  south 
rail  were  tightened  to  17,200  lb.  and  decreased  to  9,600  lb.  in  the  same  period. 

In  Table  1  similar  information  is  given  for  the  period  June  30,  1939  to  June  12, 
1940,  sUghtly  less  than  one  year.  On  June  30,  1939,  the  bolts  on  the  north  rail  were 
tightened  to  an  average  of  10,200  lb.  tension  and  at  the  end  of  one  year,  under  regular 
traffic,  the  bolt  tension  had  decreased  to  an  average  of  6,300  lb.  The  bolts  on  the  south 
rail  were  tightened  to  an  average  of  16,500  lb.  bolt  tension  and  this  tension  decreased 
to  9,000  lb.  in  the  same  period. 

The  loss  in  bolt  tension  on  both  the  north  and  south  rail  was  about  the  same  in 
the  12 -months  period  as  in  the  preceding  period.  The  south  rail  with  higher  initial  bolt 
tension,  lost  considerably  more  bolt  tension  during  the  test  period  than  did  the  north 
rail  with  the  lower  bolt  tension.  However,  even  with  this  loss,  at  the  end  of  the  test 
period  the  remaining  bolt  tension  on  the  south  rail  was  some  SO  percent  higher  than 
on  the  north  rail. 

Wear  of  Joint  Bars  and  Rail  Fishing  Surface 

Out-to-out  measurements  of  joint  bars  were  made  by  means  of  a  joint  caliper  (See 
Vol.  40,  page  570).  Measurements  were  made  on  the  top  and  bottom  ribs  of  the  bar 
near  each  end  and  at  its  middle.  The  location  of  these  measurements  is  shown  in  the 
drawing.  The  out-to-out  measurements  were  made  December  2,  1938,  on  all  joint  bars 
included  in  the  bolt  tension  tests.  These  measurements  were  repeated  on  June  12,  1940, 
and  in  Table  2  is  given  the  average  change  in  the  out-to-out  distance  during  this  period. 
In  this  table  the  change  in   out-to-out  distance  is   averaged   for   each  location   on  the 


610 Track 

joint  bar  separately,  and  also  for  the  north  and  south  rail  separately.  The  average  change 
given  is  the  average  distance  in  inches  by  which  the  out-to-out  measurements  of  the 
joint  bars  have  decreased  during  the  test  period.  It  will  be  noted  that  the  amount  of  this 
change  in  out-to-out  distance  is  approximately  the  same  on  both  the  north  and  south 
rail.  This  indicates  that  in  this  test  period  of  19  months  little  difference  in  the  amount 
of  joint  bar  and  rail  fishing  wear  resulted  from  the  difference  in  bolt  tension.  The 
measurements  show  more  wear  at  the  receiving  end  of  the  joint  than  at  the  leaving  end. 

Chicago,  Burlington  &  Quincy 

The  bolt  test  installation  on  the  Burlington  near  Western  Springs,  111.,  was  described 
in  the  report  of  two  years  ago  (Vol.  40,  page  568).  The  test  includes  approximately  40 
joints  on  the  north  rail  and  40  joints  on  the  south  rail  on  the  eastbound  main  track 
between  Western  Springs  and  Highlands.  The  rail  in  the  test  is  131-lb.  rail  with  6-hole 
toeless  joint  bars  of  both  head  free  and  head  contact  types,  1-in.  heat-treated  track 
bolts,  and  "Triflex"  or  "double-coil  improved  Hi  Power"  washers.  The  rail  on  this 
test  was  laid  new  in  August,  1938  and  the  bolt  tension  obtained  in  the  tightening  was 
measured  and  described  in  the  1939  report.  Since  many  of  the  bolts  had  been  tightened 
beyond  their  elastic  limit,  and  the  bolt  tension  measurements  depended  upon  the  elastic 
elongation  of  the  bolts,  the  bolts  were  loosened  on  October  5,  1938  and  the  permanent 
set  was  measured.  The  bolts  on  the  south  rail  were  then  retightened  to  a  bolt  tension  of 
approximately  15,000  lb.  and  those  on  the  north  rail  to  a  bolt  tension  between  20,000 
and  25,000  lb. 

Loss  of  Bolt  Tension  Under  Traffic 

After  the  October  5,  1939,  tightening  of  the  bolts,  the  bolt  tension  was  accurately 
measured  and  the  bolts  were  left  undisturbed.  Measurements  of  bolt  tensions  were 
repeated  on  November  1,  1938;  November  30,  1938;  April  25,  1939;  August  4,  1939, 
and  April  24,  1940.  On  this  last  date  it  was  thought  that  the  bolt  tension  had  decreased  to 
where  the  bolts  should  be  retightened.  Before  tightening,  however,  it  was  desired  to 
check  the  "no  load"  lengths  of  the  bolts.  To  do  this  without  disturbing  the  fishing  surface 
contacts  of  the  joints,  only  three  bolts  of  each  joint  were  loosened  at  one  time  for  "no 
load"  readings.  The  bolts  were  then  retightened,  aiming  for  an  average  of  lS,000-lb. 
bolt  tension  on  the  south  rail  and  25,000  lb.  on  the  north  rail.  Bolt  tension  readings 
were  taken  immediately  following  the  tightening  and  another  series  of  readings  was 
taken  on  October  16,  1940. 

There  are  four  different  test  sections  on  both  north  and  south  rails  of  approximately 
10  joints  each,  in  the  following  order  from  west  to  east: 

Head  free  bars  with  "Hi  Power"  washers 
Head  free  bars  with  "Triflex"  washers 
Head  contact  bars  with  "Hi  Power"  washers 
Head  contact  bars  with  "Triflex"  washers 

In  Fig.  1  the  average  bolt  tensions  at  the  various  dates  of  measurements  are  given 
for  each  separate  test  section  on  the  north  rail.  The  estimated  trend  of  the  bolt  tension 
loss  as  indicated  by  these  averages  is  also  shown.  It  will  be  noted  that  the  decrease  in 
bolt  tension  was  relatively  rapid  following  the  October  5,  1938,  tightening  for  a  period 
of  about  two  months.  The  rate  at  which  the  bolt  tension  had  decreased  since  then  has 
been  much  less  rapid.  Corresponding  data  for  the  bolts  on  the  south  rail  are  shown 
in  Fig.  2,  and  it  will  be  noted  that  on  this  rail,  also,  the  loss  in  bolt  tension  for  the  first 
two   months   after   tightening   was   relatively    much   greater   than   it   was   subsequently. 


Track 


611 


FIG.   I 
LOSS    OF      BOLT      TENSION      UNDER     TRAFFIC 

ORIGINAL      TIGHTENING       OCT.  5, IMS  RETIGHTENEO       APRIL  25,  1940 

APPROXIMATE     TRAFFIC      DENSITY      15,000,000      G.  T.      PER       YEAR 


40,000 


30,000 


S    20,000 


O     10,000 


Generally  the  rate  of  bolt  tension  loss  was  greater  with  the  "Hi  Power"  washers  than 
with  the  "Triflex"  springs.  The  rate  of  bolt  tension  loss  was  not  greatly  different  for 
the  head  contact  and  head  free  types  of  bars.  The  bolt  tension  values  shown  in  these 
two  figures  are  somewhat  different  from  those  given  in  the  committee  report  last  year 
(Vol.  41,  page  S77,  Fig.  2).  This  is  due  to  the  fact  that  the  bolt  tension  values  this 
year  could  be  corrected  for  the  permanent  set  of  the  bolts  as  determined  from  the 
April  24,  1940  readings.  Also,  for  the  north  rail  only  those  bolts  were  included  in  the 
averages  last  year  which  had  an  original  tension  on  October  S,  1938  of  approximately 
25,000  lb.  However,  this  so  reduced  the  number  of  bolts  in  the  test  that  it  was  thought 
preferable  this  year  to  include  all  the  bolts  in  the  test.  This  had  the  effect  of  lowering 
considerably  the  amount  of  the  tension  throughout  for  the  Triflex  springs,  but  the 
rate  of  bolt  tension  loss  was  very  little  affected. 

Figures  1  and  2  show  the  average  bolt  tension  as  retightened  on  April  25,  1940  and 
as  found  on  October  16,  1940.  These  values  arc  subject  to  later  correction  for  permanent 
set.  Furthermore,  the  trend  of  bolt  tension  loss  can  be  better  estimated  when  more 
measured  values  are  available.  However,  it  does  seem  apparent  that  the  rate  of  bolt 
tension  loss  in  the  six  months'  period  following  October  16,  1940  was  not  as  great  as 
in  the  six  months'  period  following  October  5,   1938. 

It  should  be  noted  that  the  bolts  in  the  north  rail  with  the  higher  original  tension 
on  April  24,  1940,  after  19  months'  service  had  much  higher  remaining  tension  than  did 
those  of  the  south  rail. 


612 


Track 


FIG.  2 
LOSS    OF      BOLT     TENSION      UNDER    TRAFFIC 

ORIGINAL       TIGHTENING       OCT.  5. 1936  RE.TIGHTE.NED       APRIL   25,  1440 

APPROXIMATE     TRAFFIC     DENSITY      IS,000,000     G.  T      PER   YEAR 


40,000 


30,000 


20,000 


o   lopoo 


LEC 

END 

30UT 

i     RA 

IL 

HEAD 
HEAD 

FREE 

^CT    H 
HI    P< 

1    POW 
IWER 

•R    X 





— 

HEAD 
HEAD 

CO  NT/ 
FREE 

CT     T 
TRIP 

UFLE) 
-EX 

—     < 

SUBJ  :CT   T< 
LATEf     REVISION 

- 

-^ 

I 

& 

^- 

"^ 

^^ 

1 

< 

^.• 

» 



II^ 

===» 

S> 

^^ 

T~^^ 

:^rt~..^ 

^~^ 

■ ^ 

■-1 

'■^rz^ 

Table  3  shows  the  average  loss  in  bolt  tension  per  month  on  each  of  the  various 
test  sections  during  the  19  months'  period  from  October  5,  1938  to  April  4,  1940. 


Table  3. — Average  Loss  in  Bolt  Tension  from  October  S,  1938  to  April  24,  1940. 

Average  Bolt  Tension  in  Lb.  No.  of  No.  Bolts 

Loss  Per  Bolts  Loose 

South    Rail                                       10-5-38    4-24-^0     Loss     Month  in  Test  4-24-40 

Head  free  Triflex    14,730        4,090       10,640       570  60  6 

Head  free  Hipower    16,710        2,190       14,520        780  58  20 

Head   contact  Tri 12,410        4,090         8,320       450  54  7 

Head  contract  H.P 19,880        2,820       17,060,       910  60,  17 

North  Rail 

Head  free  Triflex   18,400  7,050  11,350  610  58  4 

Head  free  Hipower    27,560  8,040  19,520  1,047  53  3 

Head   contact  Tri 17,840  5,500  12,340  660  41  2 

Head   contact   H.P 25,030  8,530  16,500  880  60  5 

Wear  of  Joint  Bars 

When  the  test  was  started  accurate  measurements  were  made  of  the  out-to-out 
distances  between  the  outer  faces  of  the  bars  at  each  joint  on  both  top  and  bottom  ribs 
at  each  end  and  near  the  center  of  the  bar.  (See  Fig.  3,  page  570,  Vol.  40).  As  wear 
occurs  on  the  fishing  surfaces  of  the  joint  and  rail  the  bars  are  moved  closer  together 


Track 


613 


TABLE  4. 


EASTB0l//iO 


ATerege  Change  in  Out-to-Out  Distance  of  Joint  Bars 
C.   5.  !c  Q.  H.R.  Test  Installation 
(From  October  5,  1938  to  October  16,  1940) 


Type  of  Joint 
tc  Spring  Washer 

Location     on     Joint 

North  Rail: 

Headfree  HI power 
Headfree  Trlflei 
Head  Contact  H.P. 
Head  Contact  Trl. 

A 

B 

C 

D 

Z 

y 

ATS. 

-  .009 

-  .014 

-  .034 

-  .060 

-  .053 

-  .052 

-  .023 

-  .049 

-  .031 

-  .028 

-  .058 

-  .104 

-  .079 

-  .068 

-  .065 

-  .084 

-  .022 

-  .020 

-  .058 

-  .068 

-  .063 

-  .057 

-  .054 

-  .054 

-  .043 

-  .040 

-  .049 

-  .070 

South  Raili 

Headfree  Hlpowor 
Headfree  Trl  flex 
Head  Contact  H.P. 
Head  Contact  Trl. 

-  .005 
.003 

-  .049 

-  .054 

-  .055 

-  .052 

-  .026 

-  .046 

-  .019 

-  .023 

-  .108 

-  .102 

-  .079 

-  .088 

-  .081 

-  .094 

-  .008 

-  .013 

-  .076 

-  .062 

-  .065 

-  .082 

-  .060 

-  .058 

-  .038 

-  .043 

-  .067 

-  .069 

Note:      All  values  shown  are  in  Inches.       The       "   -  "   sign  indicates  the 
"""^  average  charge  if  e  decrease  in  out-to-out  distance. 


by  the  bolt  tension  and  a  comparison  of  subsequent  out-to-out  measurements  with  the 
original  measurement  is  an  indication  of  the  rate  of  joint  bar  wear.  The  purpose  of 
making  these  measurements  was  to  determine  whether  the  amount  of  bolt  tension  had 
a  major  effect  upon  the  rate  of  joint  bar  wear. 

In  Table  4  the  average  change  in  out-to-out  distance  of  joint  bars  for  the  eight 
test  sections  is  given  separately  for  each  position  of  measurement  of  the  bar.  It  will 
be  noted  from  this  table  that  there  was  no  appreciable  difference  in  the  rate  of  wear 
on  the  north  and  south  rail  even  though  the  average  bolt  tension  over  the  test  period 
was  considerably  greater  on  the  north  rail.  It  will  also  be  noted  from  this  table  that 
the  head  free  bars  generally  show  little  inward  movement  at  the  top,  which  is  to  be 
expected  due  to  the  design  of  the  bar,  but  the  inward  movement  at  the  bottom  of  the 
bar  is  approximately  the  same  as  the  average  inward  mov^ement  of  the  head  contact 
type  bars.  Generally,  somewhat  more  wear  and  inward  movement  is  indicated  at  the  cen- 
ter of  the  bar  than  at  the  ends.  In  general,  the  results  for  the  four  test  sections  for  each 
type  of  bar  are  in  good  agreement,  the  only  exception  being  that  the  head  contact  Hi 
Power  on  the  north  rail  showed  considerably  less  inward  movement  than  the  other  three 
head  contact  test  sections.  There  was  considerable  difference  in  the  amount  of  out-to-out 
movement  in  individual  joints  in  each  test  section  and  since  only  10  joints  were  included 
in  each  test  some  variation  is  to  be  expected.  It  should  be  pointed  out  that  the  amount 
of  out-to-out  change  in  these  joint  bars  in  the  two-year  period  is  much  greater  than 
in  the  corresponding  period  on  the  Milwaukee  and  the  D.  &  R.  G.  W.  tests.  The 
traffic  density  on  the  Burlington  test  is  from  three  to  five  times  as  great  as  on  these 
other  two  test  installations,  and  this  seems  a  probable  explanation  for  the  difference. 
It  will  be  of  interest  to  note  whether  the  change  in  the  out-to-out  distance  continues 


614 Track 

at  the  same  rate  in  the  future  and,  if  so,  to  estimate  the  probable  traffic  period  when 
the  3/16-in.  clearances  between  joint  bar  and  rail  web  will  be  exhausted  by  the  inward 
movement  of  the  joint  bars  resulting  from  fishing  surface  wear. 

Denver  &  Rio  Grande  Western 

The  rail  was  laid  for  this  test  installation  on  the  D.  &  R.  G.  W.  single  track  main 
line  near  Glenwood  Springs,  Colo.,  on  September  7,  1938  (See  Vol.  40,  page  568).  The 
rail  is  131  lb.,  with  4-hole  toeless  joint  bars,  IJ^-in.  heat-treated  bolts,  and  National 
grooved  spring  washers.  At  the  time  the  rail  was  laid,  the  bolts  on  the  north  rail  were 
tightened  with  a  Nordberg  power  wrench,  and  the  bolts  on  the  south  rail  were  tightened 
by  hand  with  a  48-in.  wrench.  Very  high  bolt  tensions  were  obtained,  particularly  with 
the  power  wrench,  and  in  many  cases  the  elastic  limit  of  the  bolt  was  exceeded.  Since 
the  bolt  tension  measurements  depend  upon  a  true  elastic  elongation  of  the  bolt  it  was 
not  possible  to  determine  the  bolt  tension  originally  applied  in  tightening  until  the  bolts 
could  be  loosened  and  the  permanent  set  measured.  In  the  committee  report  last  year, 
therefore,  only  the  loss  in  tension  at  succeeding  periods  of  measurement  was  reported. 

Loss  of  Bolt  Tension  Under  Traffic 

It  was  decided  that  the  bolt  tension  had  been  so  decreased  by  traffic  that  the  bolts 
should  be  retightened  this  year.  Accordingly,  measurements  were  taken  on  October  10, 
1940,  and  the  bolts  were  then  all  loosened  and  the  permanent  set  was  measured.  From 
these  and  the  preceding  measurements,  it  was  then  possible  to  determine  the  bolt  tension 
originally  applied  on  September  7,  1938,  and  the  bolt  tension  remaining  at  the  suc- 
cessive periods  of  measurement  up  to  October  10,  1940.  This  information  is  shown  in 
Table  S.  To  conserve  space,  the  average  bolt  tension  is  shown  for  the  four  bolts  of 
each  joint  (except  as  otherwise  noted) ,  instead  of  for  each  individual  bolt.  One  point  to 
be  noted  in  Table  5  is  that  the  loss  in  bolt  tension  is  not  the  same  at  each  joint.  On  the 
north  rail,  although  a  wide  variation  in  the  bolt  tension  was  applied  to  individual  bolts 
with  the  power  wrench,  as  will  be  discussed  later,  nevertheless  the  average  bolt  tension 
apphed  per  joint  was  reasonably  uniform.  However,  at  the  time  of  the  measurements 
on  October  10,  1940,  the  average  bolt  tension  per  joint  was  relatively  quite  different  at 
individual  joints.  A  comparison  with  the  joint  gap  measurements  (Table  7,  Vol.  41, 
p.  586)  indicates  that  generally  those  joints  showing  the  greatest  loss  in  bolt  tension 
also  showed  the  greatest  expansion  movement,  as  indicated  by  the  joint  gap  openings  in 
cold  weather. 

In  Fig.  3  the  average  bolt  tension  for  the  north  and  south  rail  has  been  plotted 
with  respect  to  time  after  the  original  tightening.  The  bolts  were  not  touched  from 
September  7,  1938  to  October  10,  1940,  so  the  reduction  in  bolt  tension  resulted  from 
service  conditions  only.  Smooth  curves  have  been  drawn  to  coincide  as  nearly  as  possible 
with  the  measured  values  for  each  rail.  The  rate  of  bolt  tension  loss  was  relatively 
great  for  the  first  two  months  after  tightening  and  much  smaller  thereafter. 

Uniformity  of  Tightening 

At  the  time  of  the  original  tightening  of  the  bolts  on  September  7,  1938,  it  was 
desired  to  gain  information  on  the  variation  in  bolt  tension  obtained  in  tightening. 
Since  many  of  the  bolts  were  tightened  beyond  their  elastic  limit,  as  previously  stated, 
it  was  not  possible  at  that  time  to  show  this  variation  for  bolt  tensions  above  30,000  lb. 
per  sq.  in.  (See  Vol.  40,  pages  573,  574).  It  became  possible,  however,  to  show  this 
information  after  the  permanent  set  was  measured  on  October  10,  1940,  and  Fig.  4  has 


Track 


615 


5    ? 


o 

u 

(- 

o 

111 

o 

a. 

z 
111 

u. 

K 

I- 

od 

-t 

X 

< 

O 

a. 

d 

ID 

1- 

11. 

h 

O 

y- 

< 

2 

O      o 


SBI  Nl         NOI«N3J.        Xnoe         30VW3AV 


616 


Track 


^    z    S 

^    z    o 

=    o    a 


<     t 


o 


d 


■ 

_) 

< 

m 

m 

^ 

z 

^^^B 

H 

a 

_l 

o 

■■■ 

< 

o 

a 

^ 

>- 
< 

o 

z 

z 
u 

z 

■■ 

3 

u 

O 

c 

w 

1 

» 

■■i 

J 

<r 

_^_ 

± 

H^^l 

< 
a. 

(0 

1- 
z 

o 

z 
IJ 

O 

a 

- 

i 

o 

-> 

<0 

■— 

O 

^ 

z 
o 

-1 
o 

X 

o 

z 

- 

IT 

O 

Z 

- 

z 

I 

u 

z 
z 

-1 

>- 

^ 

i 

1 

o 

o 

^^^^1 

o 

^B 

u 

< 

bJ 

Z 

— ■ 

z 
o 

■ 

7 

^g^H 

7 

« 

u 

It 

It 
i 

1 

^^m 

s 

■ 

<A 

1- 

t- 

.1 
O 

tM 

o 

1 

(D 

4  VX'ZL 
000 'Oi  ■ 
OO^'IO  ■ 
000'S9 ■ 
OOS'Z»  ■ 
000*09  ■ 
00%'^«' 

ooo'ss- 

OOS'iS  • 
000 'OS  • 
00«'i^- 
OOO'S^  • 

oos'e*  ■ 

000 *0f  • 

ooc'ic  ■ 
000 'sc  ■ 
OOS'CT  ■ 
OOO'OC  ■ 

oo«Vs  ■ 

000  'S2  - 
OOC'ZZ  ■ 
000*02  - 
OOS'il- 
OOO'SI  - 
OOS'^I - 
000*01- 
00?  *i  - 
000 's   - 

009*2    - 


000*  ox 

■  OOS'l» 
.  O00'C9 

•  oos'z* 

000*09 

•  OOS'it 

■  ooo*ec 
oo«*w 
000 'oc 

OOS'it 
000* s» 
005 '2» 
OOO'OC 

•  OOS'IC 
'00  0*CC 

oos*zt 

OOO'OC 
OOS'iZ 

ooo*«z 

005' 22 
000*02 
00«' L\ 
000 ' SI 
OOS'21 
000*0  1 

oos'x 
ooo*s 

OOS'2 
0 


niva    HDV3     Nl      Sn08      XS3X 


Track 


617 


#2  F^rtCy^^'^rH  ^*  ^i>4rH 


O  O  Q        O 

«**ttl  O  KN 

nO  (^        CO 


00      OQOOOOOOOQOOQOQOOQQ        QQQOOO    O 
rt^      Oj  W  K*,  N  1-1  r^  iH  rH    t-<  <M  CM  •-•    -H      "^  ^!?i?3S]    iS 


a)  OOOOQQOOQOOOOOOOOOO 

\  \0  CI  P- 1^  IT*  o  i-io\mc\ir\coc\jHoco{Kou\ 

\  CNI -?  <n -^  CO  O^  W  ITi  KMT*  <0  t- CM^-^  W  J  rrv  W 

(S^  «n',KNKNC\J  ^N  CM  rt  (M  CM  Ca  ?t  rH^  a  71  WN 


^  CMCMCMCMl<^K^K^  fc,  kS  kn  k\  KNhr,  Ks^3ji^:3  ^SSSS  S\ 


3      QO    gOOOOOOOOOQOQOQOO 


On      QO    OOQOOOQOQOOOOOOOO 

^  lArH         t--r<>0  KN  Jov^iTisO^^O^  t~r-a3  0>0 

>   r4^  CM  CM         CM  ^  CM  CM  77  i-l  ^  r-<  >H  ^         rH         ,H         fH  r4 


o      S  o  O 

S.        g  CM  CM 

\     <  c?ir>      u> 


O   IT?        (<  ir\  CM 

I 


ogoooQooooooooooo 


ISIII 

1 

1 

^JJSliiS 

tH 

■3  PCiCD  ScM 

0 

R 

III 

II- 

C^CD  (D  0  O^ 

<o 

pHf^CM  r< 

55i: 

»,5 

4>  4> 

0  0  0  0  Q 

S?8^8»S 

0 

3 

*   i   K\ 

u^oa)^o  ^O 

iH  CVJ  OJ  OJ  M 

81 

K>CM   J 

CD  00         QOOQOOOOOOOOOPOQO 

^  |Rk\         lACM^KN&'S^rt  JM  cm  cm  <-<'W  cm  8?Si'2l  Jti 


-3C0-^a>  <D 
CM  CM  kSCM  cm 


^  QQ      goooogooooQOOQooo  00000 


618 


Track 


Table  6 
ODT-TO-ODT  MEASDHEMENTS 
Change  from  9/l/i&  to  lO/lO/UO 
D.  ft  R.G.V.  R.R.   Test  Installation 
Measurements   in  inches.     Minus  el^  '     dsorease  in  out-to- 


1 

2 

3 

7 

8 

9 
11 
12 
13 
ll* 
15 
16 
17 
18 
19 

.  Average 


26 

27 
29 
30 
32 

33 
3U 
35 
36 
38 
UO 
Ul 
I42 
U3 
Ui 

Average 


Position 

A 

B 

0 

D 

North  Bail 

-   .011 

.001 

- 

.010 

-   .005 

-   .023 

.00 

- 

.019 

-    .001 

-   .023 

. 

.006 

- 

.016 

-   .008 

-  .020 

.OOU 

- 

.021 

-   .002 

-  .027 

. 

.012 

- 

.029 

-   .019 

-   .011 

- 

.(xa 

- 

.023 

-   .001* 

-  .006 

- 

.021 

- 

.012 

-  .019 

-  .019 

- 

.012 

- 

.011 

-  .025 

-  .007 

- 

.012 

- 

.011 

-  .018 

-  .056 

- 

.d42 

- 

.oU3 

-  .011 

-  .007 

. 

.002 

- 

.oil* 

-   .013 

.ooU 

- 

.023 

.003 

-  .028 

-  .009 

- 

.009 

- 

.011 

-  .010 

-  .diR 

- 

.029 

-   .035 

-  .001 

- 

.010 

- 

.011 

-   .012 

-  .018 

- 

.011 

- 

.017 

-  .Oil* 

South  Bail 

-  .001 

- 

.010 

- 

.001 

-   .017 

-  .015 

- 

.006 

- 

.012 

-  .005 

-  .003 

- 

.007 

- 

.008 

-   .010 

-  .010 

- 

.019 

- 

.009 

-  .016 

-  .007 

_ 

.006 

- 

.011 

-   .012 

,00 

_ 

.020 

- 

.008 

-   .025 

-  .och 

_ 

.015 

- 

.012 

-  .021* 

-  .065 

_ 

.061 

- 

.026 

-  .017 

-  .007 

. 

.009 

- 

.018 

-  .006 

-  .oitS 

. 

.007 

- 

.038 

-   .001* 

-  .020 

- 

.(?2 

- 

.018 

-  .023 

-  .039 

- 

.053 

- 

.020 

-  .029 

-  .058 

- 

.05i* 

- 

.021* 

-   .027 

-  .035 

.015 

- 

.057 

-   .010 

-  .001* 

- 

.003 

- 

.009 

-   .021 

out  distance. 

E 

F 

027 

-   .003 

016 

-   .OQl* 

022 

-   .013 

OQl* 

-   .006 

017 

-   .009 

Q2U 

-   .002 

ocJ* 

-  .013 

007 

-  .022 

oil 

-   .027 

022 

.006 

020 

-  .017 

021 

-  .056 

022 

-   .005 

OQl* 

-  .020 

015 

-   .005 

015 

-   .013 

005 

-  .009 

Oil* 

-  .010 

Oil 

-  .015 

OQl* 

-  .oil* 

,009 

-  .012 

.008 

-  .013 

026 

-  .038 

,006 

-  .031 

.021 

-  .oci* 

,052 

.006 

003 

-  .003 

012 

-  .007 

001* 

-  .005 

060 

-  .026 

002 

-   .021 

.019 


-  .016 


.013 


u 


o 


o 


r 


^ 


EAST     ^ 


been  prepared  to  give  this  information.  This  figure  shows  the  percentage  of  the  test 
bolts  which  lay  within  successive  ranges  of  bolt  tension.  It  will  be  noted  that  the  bolt 
tension  obtained  varied  over  a  very  wide  range  with  both  the  hand  and  machine- 
tightened  bolts. 

Out-to-Out  Measurements  of  Joint  Bars 

On  September  7,  1938,  following  the  bolt  tightening,  careful  measurements  were 
made  of  the  out-to-out  distance  between  joint  bars  on  both  bottom  and  top  ribs  near 
each  end  of  the  bars  and  at  their  center.  These  measurements  were  repeated  on  October 
10,  1940,  and  the  individual  measurements  are  shown  in  Table  6,  together  with  the 
average  at  each  joint  location.  A  particular  purpose  of  these  measurements  was  to  deter- 
mine whether  the  amount  of  bolt  tension  had  a  major  effect  upon  the  rate  of  wear  of 
the  joint  bars.  Although  the  tension  on  the  north  rail  was  very  much  above  the  tension 
on  the  south  rail  throughout  the  test  period,  it  will  be  noted  that  there  is  little  change 
in  the  respective  amount  of  out-to-out  distance  on  each  rail,  indicating  that  the  amount 


Track 61Q 

of  joint  bar  wear  was  approximately  the  same  regardless  of  the  bolt  tension.  Also,  there 
does  not  seem  to  have  been  much  more  wear  at  the  center  of  the  joints  than  at  the 
ends  during  this  traffic  period.  A  somewhat  greater  amount  of  wear  apparently  occurred 
at  the  A  and  B  positions,  which  would  be  the  receiving  end  of  the  joint  in  the  direction 
of  fast  movement  down  grade. 

Continuation  of  Measurements 

The  test  bolts  were  replaced  with  new  bolts  on  October  11,  1940,  and  retightened 
by  hand,  and  bolt  tension  measurements  were  taken.  It  is  planned  to  continue  measure- 
ments to  determine  the  rate  of  loss  in  bolt  tension  and  also  joint  bar  wear.  Joint  gap 
readings  were  taken  but  they  will  not  be  shown  at  this  time  as  no  significant  change 
appears  to  have  occurred  since  the  recording  of  the  facts  given  in  Table  7,  page  586, 
Vol.  41. 

Erie   Railroad  Test  Installation 

The  test  installation  on  the  Erie  is  on  the  westbound  track  of  the  double-track 
main  Hne  at  M.P.  223,  near  Griffith,  Ind.  The  rail  is  112-lb.  section  laid  new  on  July  19, 
1939,  with  6-hole  angle  bars  and  one-inch  heat-treated  bolts.  The  test  installation  con- 
sists of  8  joints  on  the  north  rail  and  10  joints  on  the  south  rail,  a  total  of  18  joints 
and  105  test  bolts.  Triflex  springs  were  placed  on  33  of  the  test  bolts,  chrome  improved 
Hi  Power  spring  washers  on  32,  and  improved  Hi  Power  spring  washers  on  39. 

Loss  of  Bolt  Tension  Under  Traffic 

Last  year's  report  included  a  chart  showing  the  range  of  bolt  tension  obtained  in 
tightening.  The  bolts  were  left  undisturbed  following  this  tightening  until  December  17, 
1939,  approximately  five  months,  at  which  time  the  bolt  tension  remaining  in  the  bolts 
was  measured.  The  individual  bolt  tensions  measured  at  this  time  and  at  the  original 
tightening  on  July  14,  1939,  are  shown  in  Table  7  and  the  average  values  are  given 
for  both  bolt  positions  and  joints  for  each  type  of  spring  washer  used. 

The  bolts  were  then  retightened  with  a  Raco  power  wrench  and  the  tension 
measured.  No  further  tightening  was  done  until  October  15,  1940,  at  which  time  the 
tension  remaining  in  the  bolts  was  read.  The  individual  bolt  tension  measurements 
obtained  at  these  two  times  are  shown  in  Table  8. 

Out-to-Out  Measurements  of  Joint  Bars 

At  the  time  of  making  the  bolt  tension  measurements,  the  out-to-out  distance 
between  joint  bars  was  measured  with  the  joint  bar  caliper  on  the  center  line  of  the 
joint  bar  near  each  end  and  at  the  middle.  Readings  could  not  be  taken  on  the  bottom 
ribs  with  the  caliper  because  the  joint  bars  were  of  the  angle  bar  type  and  the  caliper 
would  not  span  the  outstanding  flanges. 

In  Table  9,  the  change  in  out-to-out  measurements  at  each  location  of  measure- 
ment is  shown  during  the  periods  that  the  loss  of  bolt  tension  under  traffic  was 
measured.  Comparison  of  the  loss  in  bolt  tension  with  the  change  in  out-to-out  distance 
affords  an  interesting  study.  In  the  first  five  months'  period  after  the  rail  was  laid, 
the  change  in  out-to-out  distance  averaged  about  0.02  in.,  being  perhaps  SO  percent 
greater  at  the  middle  of  the  joints  than  at  the  ends  and  nearly  the  same  for  the  different 
types  of  springs.  The  bolt  tension  decreased  considerably  in  this  period  with  the  Hi 
Power  springs  and  decreased  more  at  the  two  center  bolts  than  at  the  remaining  bolts. 
The  loss  in  bolt  tension  was  somewhat  less,  with  the  Triflex  springs. 


620 


Track 


Sf    888888    8       888888    8 


^        t- ^r^_d■  NMA  r-       iTv 


I  CO  CJs  r-l  CO  i~<  0\ 


8888888    8 

O^CVJ  •-•  o3h}  CM       >« 


88    888 

t-*  i^   I   fO  ON  O 
OS  OJ        t<\^  Os 


888888    8 

<x)  r-  <H  rfN_d"  ^      K\ 


888888       8 

JCJ  OVOO  dlTv    I         K\ 
«     ft     «     *    %    4  • 


18    888 

>  UN    I   KNCJ  J 


'  t-t--f-(D  CO 
>-l  rt  iH 


88    888       S 

m  J-  O  ^  NN  oo    I         CTv 


CJ  t~        t~K\- 


135 

is 

g5 


SlTv    I   lf\rO  oo 


I  -P  »C\        O^CO  CO  rH  O  N 


J  lA       -It         iH  C\J 

888888  8 

t—  CO  00  ir\  00  KN  CD 

O  lA        cy  ITS  rr\  _CJ 


888888    8 

0\K>rH-4  ON  O  CO 


o  ^ 


8,500 
8,500 
11,600 
5.U00 

3.100 
10,100 

8 

888888 

«Mr>-35  CO  cNov  1 

to 

7,700 
11,600 
11,600 

7.700 
10,100 

8 

t- 

8888888 

CVJ  #H  CO  oNOnOnOn 

8 

* 

9,500 

7,000 

15.900 

8,500 

15.900 

8 

§8    88 

1  vO  ir>  1  ir\0^ 

1 

8888888 

CM-C\J*<t-Ca  KN 

1 

rH  00  CO  (<\         O 


K  K  X  CO  CO  CO  tf 


'oa?JuNcor<N      oo 


oazKcacococo 

■§vo  r~co  r-c&  cf\<4 


w  e-1 


O    -H 


rf  B  o5  5*5 -3cy  t-- 

»     I    lA  IA_^  rH  CVl  OJ 
>   -rj  rH  r-l  H  »H  rH   ^ 

isS     888 

„  3  OJ  o      rt  t~3 

vO  O     ft    «   I      •    ft    • 

rH_3         (DOW 
Cy  f-1         «-l  H  H 

^    ir>8    38  8 


8888888  8 

j<3rH  o  cy  t-^  CO 

*H  rA  1-1  (H  ro  K\_:t  OJ 

888888  8 

•    *•««*  « 

-qO^*^  OJ  iH  rH  fA 


888888    8 

CM  CVJ  i^r-fco      hr\ 


a 

^^    j:^^i3 

^ 

K\»AC0-4>O_^ 
rH  rH          rH  rH  H 

» 

88    888 

8 

888888 

8 

•^8^ 

C-IA        0\fH  CO 

t- 

LAsO          0\0MA 

o 

JiJ'-J^'S'^i 

uoIh 

J8 

88|888 

1 

88888 

8 

■P  4>  NN 

r-l  OJ  O  rH  CU 

^S 

CO  t-_d"lAONO 

OJ 

O  K\-4  O  rr\ 

a 

1  888888     8 

■H.        CVJ         jK\Olf\K\CVJ  K\ 


88888    8 


w  r^-^  rH  r-  r<^      ^  o  t^  "^"^^      S^ 


cg-SSSSSSS  8 

r- O*  ON  uS  rH  OJ  t*-  »?\ 

5  C?0  CD  0?iH-:Jor  rH 

Jtr-tt-*         ^  f-tr^  rH  rH 

I 

«888888  8 

O  t~-:tl7\CJ  lA  On 

J  O  CVI  nO  KNnO  K\ 

M  r1  f*  r^  I-*  tH  e-t 

888888  8 

-^CJ  rH  O  OJ  K\  UN 

888888  8 

oB3i-i^r-rt  cv^ 

if\r---^oj  o  <y\  CO 

8888888  8 

O^0JH)ffir40i3  rCN 

On  CD  nO  LA  On  f<\  OJ  On 
rH  rH 

8888888  8 

O  3  CO  t- CMTv  UN  00 


888888  8 

r-r-t— t^-3co  CVJ 

o  uNUNcJcvi  c^  -* 

iH  i-l  IH  r-l  H  iH  rH 


S§§S8    8 

I      ft     ft    ft    ft     ft  • 

U\<H  i-l  KNCO        ^ 


8888888    8 

OJ  Oi  lA  f-  c-3  ^       o 
KM<\rHUMAMON        K\ 


fl         iHtVJKNiHCVJKN  »  t<\3 1^1-3  lAvO  O  NOt~*t-*OvO  « 


Track 


621 


SS88    8        8888SS     8 

■^  ^  CMf\        UN  ir\N0  0\NN0\O         o? 


888888 

CO  t— -5  ^  CMf\ 


»  t-  ON  •-«  ^  r 


S8888SS  8 

vO  OJ  O  ir^  CO  r- rt  3 

rJ  I>  00   f^  C\J   CM  CU  r^ 

(-1                   <H   p-t  r-4  H  r4 


11. Ill 

<y  in      o_rt  w 


888888  8 

K^0tf\.-^3^0  co 

•  **   *   *   •   *  « 

Of^CO  O  M  rH  On 

'    '   »H  H  I-! 


888888       8 


)  J    I    >-•  O  CO 


r-M  O'S'Sj  CO  r-l 


888888 

.zjr^  Ovcy  UMA 


88    888 

K\co   I  o3co 


8       888888    8 

^  >0  ir\>B  (u  m  iH      ^ 


bD-H 

a  CO 

.9  "^        8 

d   -P  K\  O^  O  CVi  KNJ  rH 

Br-I  ««««^^ 

•    O  -ZJO^COHNt^Os 
Oh    CQ 


88    8 


«H  03  r-iNO  eg  O  CO 

88888  § 

"  O  CVJ  o7cO  CD  O 

r-l  H  rH  rH  rH 


888888 

UMT*  rH  m  N-»  ON    I 
rH  oT-d'  '-'   f^  ON 


8  0  O  O  O  O  Q  O 

o  o  o  o  o  o  o 

J-ONNNrH  lA_:JrH  CJ 

OJ -Zj  N^  ON  i-t  t^  CJs  CO 


888888    8 

o  cu  fo*  o  oj  ir»      CO 


88888     8 

t^l**hNKNOJ  CO 


OJ  CJ  OJ  ir\_:t_:jcD 

CO  MN  ro,  rH  OJ  <\l  ON 


888888 


88    88     8 

*cg-0    "eS-^      o 


r-  CO  a  t-  vo  w  -3 


0         I     I     I     I     I    I 

..4     HOfH  CO   Pl^^^  Cy  KN 

45 


3      So 


5,1888888 

0\       i(  (I,  t^  N©  t^  in  ON  iTv 

OS         •  d-q  f<>K\hrvasON 
«-H  ^   W  H  rH  r-l  CVJ  r^  rH 


^888888    8 

«H  iH  ir>  rH  us  OS  ^      c^ 


I  ox- 


>_:tN6  iH  CO  CO  < 


r^  Urtrt^r-lrHrH         7-1  5   ?l  rt  T5  <M  M  r<  rt  .-I 


O   -H  rH 


'fi      .       i88    888    8 

O  _    C  r-l  J  KSjrH  K\ 


s   ^ 

CO   OJ           «H  fH  CO 

•a 

88     888 

51-=' 
•»> 

88    888 

rH  C>  rH  CO  CO 
rH                  Cy  rHrH 

88||88 

so  OS  JtMTvsO 

1    . 
1 

15.700 
UL,eoo 

6,600 
28,000 
19,800 
15.700 

r* 

§§§888 

o  o>o  osK^sS 

^■3 


W  OJ  OJ  <NJ        W 


MTv  O  CO  On 


rH  rH  rH  CU   rH   OJ 


-^nO  ^  rH  O  rrs        CO 

oTrHrHO    t^O  ^ 

rH  rH  rH  OJ  rH   rH         ^ 


888888       8 

iTvO  r-  rH  CO  r-  ir\ 


3cO  COnO  CO  lA        OJ 
OJ  O   r^  rH   O   m         NN 


88    8       888888       8 

CO  lA      cy  -arHjcosC^    |        a, 


0_a^  W  OslTvCD 
OJ  »H  r-*  Cy  r-) 


8  88888  8  8888888  8 

CO  lAO^NOr-  nO  3oNOj-4^uxr-  *-» 

nO  ir.r-ONrHJ  ir\  nO  c^moi  ir\sO  tr\  r^ 

r^  t-i  r^  t-t  ,-i   '-i  f-4  OJ          rHrHOJrHrH  t-t 

8  88888  8  8888888  8 

to  ONNOCTvh-f^  ^  irNCOLTNrHNO  m_:J  i/\ 

•  !*••••  •  «««««*«  « 

sO  KNrHO-a^rH  sO  sOONOtDOvOrH  00 

i-H  rHrHOjHOJ  rH  rHrHrHrHOJrHOj  ,-« 


:8    88    8       8888888    8 

»OJ    .OOs      OJ  tr*-^  rH  ov  ir\  O  o       if\ 


f^  ft  rH   OJ  >^ 


O  sO  vOrHtOmOO^ 


rH   OJ   rH  OJ  K^ 


S^ 


*  &  5>  6 

•3         rH  CM  K\  »H  CU  lA  •  HsJlA^USsfl  »  sfl  c- CO  t- tO  Os  O  • 


622 


Track 


Change  in  Ont-to-Out  Measuroncnt  of  Joint  Bars 
Erie  B.H.  Tost  Installatioit 


July  lU 

,  1939  to  Boo. 

17,  1939 

Deo.  17, 

1939  to  Oct, 

15. 

i9Uc 

Position 

Position 

Joint  Bo. 

A 

B 

C 

A 

B 

c 

ChroiQo 

Hi-Pou/er 

Spring  Hashers 

1-N 

-   .012 

-  .007 

-  .021 

- 

.010 

-  ,017 

- 

.006 

2-N 

-  .015 

-  .019 

-  .017 

- 

.006 

-  ,025 

. 

.008 

3-H 

-  .017 

-   .012 

-   c030 

- 

.007 

-  .027 

- 

.000 

1-6 

-  .069 

-  .0U5 

-  .007 

- 

.ooU 

-    .006 

- 

.0124 

2-S 

-  .017 

-  .030 

-  .015 

- 

.007 

-  .oil* 

. 

.009 

3-s 

-   .020 

-  .<«3 

-  .oil* 

- 

,001* 

-   .012 

- 

.002 

Iron  go 

-   .018 

-  .oeii 

-  .017 

- 

.007 

-  ,017 

- 

.006 

rriflez  Springs 

3-« 

-   .017 

-   ,012 

-  .030 

- 

.007 

-   .027 

- 

.000 

i«-l 

-  .013 

-  .033 

-   .022 

. 

.009 

-  .016 

. 

.008 

£.' 

-  .015 

-  ,025 

-   .010 

. 

.011 

-    ,010 

_ 

.007 

-   .018 

-   .026 

-   .020 

. 

,007 

-  .016 

. 

.Olii 

5-6 

-  .022 

-   .031 

-  .015 

- 

.006 

-  ,013 

_ 

.003 

6-8 

-  .016 

-   .020 

-  .019 

- 

,010 

-   .010 

- 

.006 

Average 

-  .017 

-    .02U 

-  ,019 

- 

.008 

-  .015 

- 

.006 

Hi-Povrer  Springs 

6-N 

-  .015 

-   .03i* 

-  .019 

- 

.010 

-  .016 

- 

.009 

7-N 

-  .026 

-  .016 

-  .019 

- 

.001 

-  .025 

_ 

.005 

S.H 

-   .022 

-  .031* 

-    .023 

. 

.010 

-  .019 

_ 

.005 

7-S 

-  .026 

-  .032 

-  .oU* 

- 

.000 

-  -oil 

_ 

.011 

a-8 

-  .021 

-  .027 

-  .019 

. 

.000 

-    .010 

_ 

.010 

9-6 

-  .025 

-  .ca6 

-  .019 

- 

.001 

-  .017 

_ 

.005 

lOS 

-  .013 

-   .026 

-  .005 

- 

.003 

-  .007 

- 

,016 

Average 


-   .026 


.017 


-   ,00lt 


-  .016 


Measurements  shoun  represent  decrease  in  out-t(^out 
distance  of  Joint  bore. 


In  the  ten  months'  period  following  retightening  of  the  bolts,  the  loss  in  bolt  tension 
was  about  the  same  as  in  the  preceding  test  period  of  only  five  months.  In  this  period, 
the  change  in  out-to-out  distance  averaged  about  0.01  in.  and  was  about  twice  as  great 
at  the  two  center  bolts  as  at  the  remaining  bolts.  Again,  there  was  little  difference  in 
out-to-out  change  with  the  different  types  of  springs.  Also,  in  this  latter  period  there 
was  not  so  marked  a  difference  in  the  loss  of  bolt  tension  with  the  various  types  of 
springs.  The  Hi  Power  springs  had  a  higher  initial  tension  than  the  Triflex  and  also 
had  a  higher  tension  at  the  close  of  the  test  period.  The  performance  of  the  Triflex 
was  somewhat  better  in  maintaining  more  uniform  tension  at  individual  bolts. 

Continuation  of  Measurements 

The  bolts  were  retightened  on  October  15,  1940,  and  the  measurements  will  be 
continued.  It  is  also  planned  to  make  some  laboratory  tests  on  the  overall  reactance 
properties  of  the  various  types  of  springs  to  include  the  reactance  effects  of  the  bolt. 
With  this  information  it  will  be  possible  to  determine  to  what  extent  inward  move- 
ment of  the  joint  bars  as  a  result  of  fishing  surface  wear,  explains  the  measured  loss 
in  bolt  tension  under  traffic. 


Track 


623 


Pennsylvania    Railroad 

This  test  installation  on  the  Pennsylvania  Railroad  is  located  on  Track  1  of  the 
three-track  main  hne  near  Birmingham,  Pa.  This  track  carries  the  major  portion  of 
the  eastbound  passenger  and  freight  traffic  and  the  traffic  density  is  quite  high,  from 
50,000,000  to  70,000,000  gross  tons  per  year.  The  rail  is  lS2-lb.  Permsylvania  section, 
with  6-hole  toeless  controlled  bearing  joint  bars,  IJ^-in.  bolts,  and  spring  washers.  The 
bolts  were  especially  selected  for  the  test  to  insure  that  the  nut  could  be  freely  turned 
by  hand  over  the  entire  threaded  portion  of  the  bolt.  The  rail  was  laid  new  in  the 
early  part  of  August,   1939. 

Uniformity  of  Bolt  Tension  Obtained  in  Tightening 

Last  year's  report  included  a  chart  (Vol.  41,  page  589)  showing  the  range  in  bolt 
tension  obtained  in  tightening  the  bolts  with  a  Raco  power  wrench.  On  June  21,  1940, 
the  bolts  were  loosened  and  retightened  with  a  Raco  power  wrench  with  the  improved 
type  ''kick-off".  Of  the  103  test  bolts,  24  were  tightened  by  hand  because  of  lack  of 
clearance  for  the  machine  chuck  with  the  special  type  of  joint  tie  plate  used.  In  Fig.  5, 
the  range  of  bolt  tension  obtained  in  tightening  these  bolts  with  the  power  wrench  is 
shown.  The  bolts  tightened  by  hand  are,  of  course,  not  included.  It  will  be  noted  from 


FIG. 5 

PENNSYLVANIA     R.    R.    BOLT    TEST      INSTALLATION 

VARIATION    IN     BOLT     TENSION 
OBTAINED    IN     TIGHTENING    WITH    IMPROVED 
RACO     POWER     WRENCH      ON      JUNE  21,  1940 
152*  RAIL   -  6  HOLE    TOELESS     JT.    BARS-   l^     H.  T      BOLTS. 
WITH    SPRING     WASHERS 


e  h 


II          ■ 

II 

1  1 

I     I     I     I      I     I     I     I     I 


<\i     (\l     r4     ct 


BOLT     TENSION    -     LBS. 


624 


Track 


FIG.  6 
PENNSYLVANIA     R.  R.    BOLT    TEST     INSTALLATION 

VARIATION  IN        BOLT  TENSION 

OBTAINED         IN        TIGHTENING        WITH        HAND      WRENCHES 
ON    NOV.   14,     1940 
IS2*     RAIL   ~    e   HOLE      TOELESS       JOINT    BARS      ~         iV^'     H.  T.    BOLTS 
WITH         SPRING        WASHERS 


N 

)RTH 

RAIL 
36- 

-      HAHO     Tl< 
WRE  NCH 

IHTEN 

ED 

1 

1, 

1 

1 

llll 

1     1 

S 

OUTH 

RAIL 
48' 

-      HAI 
WR 

10     TIC 
INCH 

HTEN 

:d 

■ 

1 

1 

1 

n 

1 

I 

1              II 

1 

^    vj    L-    ■_    <g 


^  «  --  o  5,-  «f  t  o  1^  SI  !;;  8  s 


BOLT   TENSION  -   LBS. 


comparison  with  the  chart  in  last  year's  report  that  an  improvement  has  been  affected 
in  uniformity.  However,  there  is  still  a  wide  range  in  the  applied  tension,  even  with 
the  free  turning  nuts.  Tests  conducted  with  this  machine  by  the  Pennsylvania  Railroad 
in  the  laboratory  at  Altoona  indicated  that  the  torque  delivered  by  this  machine,  and 
also  with  a  Nordberg  power  wrench,  at  the  time  of  kick-off  was  much  more  uniform 
than  the  range  of  bolt  tension  obtained  in  these  tests.  It  seems  therefore  that  the  varia- 
tion in  thread  friction  during  tightening,  even  with  free  turning  nuts,  is  sufficient  to 
produce  considerable  variation  in  the  bolt  tension  obtained. 

On  November  14,  1940,  these  test  bolts  were  retightened  with  hand  wrenches.  One 
track  man  tightened  the  bolts  on  the  north  rail  with  a  36-in.  wrench,  and  another  man 
tightened  the  bolts  in  the  south  rail  with  a  48-in.  wrench.  The  men  were  instructed  to 
tighten  these  bolts  just  as  they  would  do  in  regular  maintenance  work.  The  range  in 


Track 


625 


&    888888§8§888888§8 
88888888888888888 

t      88888888888888888 
rX  r^\0   r^-^(^^  c7(0   (>  CO  W  "^  £^7  JO-^  ^ 

"^a    §8888888888    88888 

S  4>   r^t^t-^_:ja?ojo7^0  <-•  r-t  o   cd  cu  oj  t^^ 

•  » 

It    8888       88    88888888 

S      a?iAK^J  a?^o      ON  r- to  u>  ^  c~- rvN  t~- 

«<  rH  <-•  >-> 

O 

I       88888888888^8888 
88888888888888888 

tH3o<HO\vOt^<oir\Ocvjc-r-K\Oi-i  kn_j 


4>         '<  N  K\  J  ITIVO  t- OD  ON  O  rH  Ol  KJ^  UJ^  rj 


S,    88888888888888§88  | 

d         CVJ  CU  <D  to  o3kn -O  ITNi-l  O  CD  rH^O  J  UN  ^ 

e      cjoo  <^t~<o  o^r^r^-0  r^  ciNt-^5  t-^o  i^o  m 

88888888888888888  8 

O  a\  f- ir\  O  r- ITv  O  K\  UN  CVI  -H  iH  J  r^ -H  W  rH  <» 

O  aJsO  oTcDnO  rt-4-O  KNj^CU  UN<\J  CJ  KNCU  UN 

p       88888888888888888  8 

^          a?  ONt^K^C^p  (>cJ(^a?<Nr2!::i02:27^  S 

'  fl    88888888888    88888  § 

V    8-a  r-S  KN_:JO  KN^-irfNrH  OS    I   -3   OHNUNKN  O 

1^    88888    88888888888  8 

8  rt  K\3  0-5'<N'-<          ONrH  rH  r^  ONO-a   r<UNC^UN  tO 

flO         CNOUNUNOJ         OJOJKNOCyf-'^^OCT  S 

o 

I       8888888888888888.  g 

a         <M  UNXNKNJkn5<M  J3CVJ  rH  rt  CO  M^(>    I  o 

t^  J  UN  UN  ir>  rt  KN  UN  UN  J  OJ  CJ  CT>  W -3  On  « 

04  H  eg  i-l  CM  •-<  iH  r^  »-4  eg  rH  rH  rt    r-l  KN  rj 

88888888888888888  8 

sO  UNCO  u^G^-3  lAoTcj  lf^u^_^  o  oj  H^u^K^  5 


Is 

9  ^ 

u  o 


5        '^CMKN^UN>Ot-.«>OsOj55jKN^UJ^tJ 


626 Track 

bolt  tension  obtained  is  shown  in  Fig.  6.  The  amount  of  variation  was  somewhat 
greater  than  was  obtained  with  the  power  wrench  (Fig.  5),  but  not  markedly  so.  The 
average  bolt  tension  obtained  was  approximately  Vs  greater  with  the  hand  tightening. 
The  average  bolt  tension  obtained  on  the  south  rail  using  the  48-in.  wrench  was  12 
percent  greater  than  on  the  north  rail  using  the  36-in.  wrench.  The  48-in.  wrench  should 
have  afforded  33  percent  more  torque,  but  it  was  observed  that  the  track  man  did  not 
grasp  the  wrench  at  its  end  and  thus  did  not  fully  avail  himself  of  the  increased  length. 

Loss  of  Bolt  Tension  Under  Traffic 

In  the  presentation  of  the  test  results,  measurements  of  individual  bolts  have  not 
been  given  generally  because  of  the  space  required.  However,  for  this  test  installation 
the  number  of  bolts  used  permits  showing  the  individual  measurements.  In  Table  10, 
the  bolt  tension  appUed  June  21,  1940,  is  shown,  and  also  the  tension  remaining  on 
November  14,  1940.  During  this  service  period  of  approximately  five  months  the  average 
bolt  tension  decreased  from  18,600  lb.  to  9,000  lb.  The  table  shows  the  bolt  tension  loss 
at  the  different  bolt  positions. 

Bolt  Average  Tension 

Position  Loss  Lb. 

1     8,000 

2      8,200 

3     13,400 

4     11,000 

5     8,600 

6     8,200 

In  this  test,  the  bolt  tension  loss  was  approximately  50  percent  greater  at  the  two 
center  bolt  positions  than  at  the  remaining  bolt  positions. 

In  comparing  this  test  with  the  other  test  installations,  the  large  amount  of  traffic 
carried  during  the  test  period  should  be  kept  in  mind. 

Continuation  of  Test 

The  bolts  were  retightened  on  November  14,  1940,  and  the  applied  bolt  tension 
measured.  Measurements  were  also  made  of  the  out-to-out  distance  between  joint  bars 
so  that  information  would  be  available  on  the  rate  of  joint  bar  wear  in  the  future. 


Report  on  Assignment  10 

Lubrication  of  Rail  on  Curves 

Collaborating  with   Committee   16 — Economics  of  Railway 
Location  and  Operation 

S.  Hales  (chairman,  subcommittee),  L.  L.  Adams,  W.  H.  Bettis,  L.  H.  Bond,  A.  F. 
Huber,  F.  J.  Jerome,  E.  E.  Martin,  K.  R.  McLennan,  S.  H.  Poore,  C.  R.  Strattman, 
M.  J.  T.  Zeeman. 

The  two  preceding  reports  on  this  subject  are  in  the  Proceedings  noted  below: 

Vol.  39,  pages  419  to  421— 

This  report  listed  four  methods  of  lubrication  and  a  method  of  determining 
the  economy  of  rail  lubricators  was  described. 


Track 627 

Vol.  40,  pages  575  to  581— 

This  second  report  presented  information  concerning  the  cost  of  mechanical 
lubricators  installed  in  track,  together  with  information  on  the  effective  distance 
over  which  the  lubricant  is  carried  on  various  curves. 

Charts  were  presented  showing  the  rate  of  wear  on  rail  for  various  degrees 
of  curves  before  and  after  installation  of  lubricators. 

Information  was  furnished  on  the  savings  effected  on  one  railroad  due  to 
increased  rail  life  as  a  result  of  mechanical  lubricators  on  locomotives  applying 
lubricant  direct  to  the  rail. 

Two  methods  of  determining  the  economy  of  lubricators  were  shown. 

A  report  by  Committee  16  of  a  test  on  the  Denver  &  Salt  Lake  Railway  in  1939, 
(see  Vol.  41,  pages  151  to  154)  shows  the  operating  advantage  of  rail  lubrication. 

Since  the  two  preceding  reports,  the  committee  has  obtained  some  information  on 
the  saving  in  engine  tire  wear  and  the  following  is  reported  as  of  value  in  determining 
additional  savings  due  to  lubrication. 

These  samples  are  all  on  the  same  railroad  but  on  different  divisions: 

Division 
ABC 

Total  mileage    83.05         145.50  254.4 

Total  curve  mileage  oiled    14.12           44.91  97.47 

Total  central  angle  oiled   2793°          7801°  16471° 

Number  of  oilers  13               41  67 

Number  of  Tires  changed  per  year 

Before    oihng    124              288  252 

After  oiling   109               28  48 

Difference   15  260  204 

Division 
ABC 

Annual  saving  on  engine  tires $   450        $7,800        $6,120 

Annual  cost  of  lubrication 1,820  5,720  9,400 

Annual  saving  per  lubricator   34.50  190  91 .50 

In  the  case  of  Division  B,  the  lubricators  are  justified  on  the  saving  in  tire  changes 
alone  and  in  each  case  the  savings  listed  above  are  in  addition  to  the  savings  due  to 
increased  life  of  rail. 

One  railroad  also  reports  as  follows: 

Our  best  illustration  of  the  use  of  rail  and  flange  lubricators  is  on  one  of  our 
mountain  divisions  a  distance  of  82  miles,  of  which  about  48J^  percent  is  curve 
track,  many  of  the  curves  running  over  10  deg.  There  are  38  lubricator  installa- 
tions on  this  line,  which  averages  2.15  miles  of  track  per  lubricator.  The  installa- 
tion cost  about  .?375  each,  installed.  The  annual  cost  for  the  complete  lubrication, 
including  grease,  maintenance,  cleaning  and  repairing,  as  well  as  handUng  and 
filling  the  lubricators,  interest  and  depreciation,  amounts  to  approximately  $5,363. 
The  estimated  saving  on  the  installation  is  .$8,000  in  rail  and  other  track  hardware 
renewals  and  $2,900  in  engine  tire  expense,  or  a  net  annual  saving  of  approximately 
$5,500. 

In  the  territories  where  these  lubricators  are  used  the  life  of  front  tires  before 
the  lubricators  were  applied  was  2J/^   months  for  freight  engines  and   2   months 


628 Track 

for  passenger  engines.  Since  application  of  the  lubricators  the  hfe  of  front  tires 
has  been  increased  to  4>2  months  for  freight  engines  and  3J^  months  for  passenger 
engines. 

The  information  shown  indicates  considerable  saving  in  tire  wear  and  is  of  value  in 
determining  the  additional  savings. 

The  committee  has  made  considerable  effort  to  determine  ratios  between  degree  of 
curve,  central  angle,  increased  life  of  rail,  etc.,  but  information  from  various  sources 
shows  that  each  location  is  a  separate  problem  and  such  ratios  are  indeterminable. 

This  report  together  with  others  which  have  been  made  furnishes  all  the  informa- 
tion necessary  to  determine  the  economy  of  lubricators  and,  while  additional  informa- 
tion would  be  helpful,  it  is  felt  that  the  conclusions  presented  in  the  committee's  second 
report  are  thoroughly  established. 

These  conclusions  are  as  follows: 

The  life  of  rail  on  curves  can  be  extended  by  lubrication  of  the  rail. 

Lubrication  of  rail  on  curves  can  be  accomplished  by  the  following  methods  (in 
order  of  preference). 

(a)  Mechanical  lubricators  installed  in  track 

(b)  Mechanical  flange  lubricators  on  locomotives 

(c)  Mechanical  lubricators  on  locomotives  applying  lubricant  direct  to  rail 

(d)  Manual  lubrication  of  rail. 

In  addition  to  increasing  the  life  of  rail  on  curves,  lubrication  accomplishes  the 
following: 

(a)  Decreased  cost  of  engine  tires 

(b)  Longer  service  life  of  ties  because  of  decreased  gaging 

(c)  Decreased  train  resistance  permitting  either  increased  tonnage,  better  time  or 
less  coal  consumption. 

The  economic  justification  for  lubrication  depends  upon  the  estimated  annual  saving 
resulting,  as  compared  with  the  total  estimated  annual  cost  of  lubrication. 

The  kind  of  lubricant  most  satisfactory  in  mechanical  track  lubricators  is  a  grease 
or  oil  of  heavy  consistency. 

Your  committee  recommends  that  these  conclusions  be  adopted  and  published  in 
the  Manual. 


Report  on  Assignment  11 

Prevention  of  Damage  Due  to  Brine  Drippings  on 
Tracks  and  Structures 

Collaborating  with  Mechanical  Division 

G.  M.  Magee  (chairman,  subcommittee),  W.  G.  Arn*,  C.  W.  Baldridge,  H.  R,  Clarke, 

F.  W.  Hillman,  C.  T.  Jackson,  J.  de  N.  Macomb,  K.  R.  McLennan,  W.  A.  Murray, 

G.  L.  Sitton,  C.  R.  Strattman,  J.  G.  Wishart. 

At  the  last  meeting  of  the  Joint  Committee,  representing  the  Engineering  Division 
(AREA)  and  the  Mechanical  Division,  held  in  the  early  part  of  1940;  it  was  decided 
that  two  additional  series  of  tests  should  be  conducted.  In  one  series,  refrigerator  cars 


*  Mr.  Arn  is  chairman  of  the  Joint  Committee  on  Prevention  of  Damage  Due  to  Brine  Drippings, 
composed  of  representatives  of  the  Engineering  and  Mechanical  divisions. 


Track 629 

in  regular  service  runs  were  to  be  iced  and  treated  with  salt  containing  inhibitor.  The 
brine  drippings  from  these  cars  were  to  be  collected  at  intervals  and  analyzed  to  deter- 
mine whether  the  sodium-dichromate  dissolved  at  substantially  the  same  rate  as  salt  and 
offered  protection  throughout  the  test  run.  The  other  series  of  tests  were  to  be  track 
tests  in  which  two  rails  in  track  would  be  sprayed  daily,  one  rail  with  brine  containing 
inhibitor,  and  the  other  with  brine  only.  The  following  report  is  an  account  of  two 
tests  made  on  the  Atchison,  Topeka  &  Santa  Fe  Railway  to  determine  the  concentration 
of  sodium-dichromate  in  the  brine  drippings  from  refrigerator  cars. 

Tests  were  made  as  follows: 

1.  To  determine  whether  adding  the  inhibitor  to  the  salt  had  any  effect  on 
the  temperature  of  the  brine. 

2.  To  collect  brine  drippings  at  intervals  from  an  empty  car  iced  and  salted 
with  salt  containing  inhibitor  and  left  standing  at  the  icing  dock. 

3.  To  collect  samples  of  brine  drippings  at  intervals  in  a  regular  service  run 
from  a  refrigerator  car  iced  and  salted  -with  salt  containing  inhibitor. 

Effect  on  the  Temperature  of  Brine  of  Adding 
Sodium-Dichromate  Inhibitor  to  Salt 

Purpose  of  the  Tests. — It  had  been  assumed  that  due  to  the  characteristics  of  sodium- 
dichromate  and  soda  ash  and  the  relatively  small  amount  used,  this  inhibitor  would 
have  no  effect  on  the  refrigerating  qualities  of  the  ice  and  salt  mixture  used  in  refrigerator 
cars.  It  was  decided  to  investigate  this  by  test,  before  starting  the  refrigerator  car  tests. 

Procedure  of  Test. — ^The  test  was  made  at  the  Hobart  ice  plant  of  the  Santa  Fe  at 
Los  Angeles  on  June  29,  1940.  Two  identical  metal  buckets  were  selected,  and  24  lb.  of 
crushed  ice  was  placed  in  each  bucket.  In  bucket  No.  2,  6  lb.  of  salt  was  placed  over 
the  ice.  In  bucket  No.  1,  6  lb.  of  salt  containing  inhibitor  was  placed  over  the  ice.  In 
each  bucket  the  salt  was  mixed  into  the  ice  by  stirring.  The  proportion  of  inhibitor 
added  to  the  salt  was  the  same  as  used  in  the  road  tests  later  described.  (220  lb.  salt — 
3  lb.  sodium  dichromate — 2  lb.  soda  ash.)  The  temperature  was  determined  by  placing 
a  thermometer  in  the  brine  mixture  in  each  bucket. 

Log  of  Test:  June  29,  1940 
1:51  p.  m.:  24  lb.  crushed  ice  (3  in.  maximum  size)   placed  in  each  of  two  buckets. 
1:53  p.  m.:  6  lb.  salt  added  to  bucket  No.  2;  6  lb.  of  salt  and  inhibitor  added  to 

bucket  No.  1. 
2:25  p.  m.:  Bucket  No.  2,  salt  only,  6  deg.  F.  Bucket  No.  1,  salt  and  inhibitor,  7  deg.  F. 

(Taken  after  stirring;  thermometer  placed  in  brine). 
2:37  p.  m.:  Bucket   No.    2,   salt   only,    10  deg.   F.  Bucket  No.    1,   salt  and   inhibitor, 

10  deg.  F. 
3:10  p.  m.:  Bucket  No.   2,   salt   only,    13   deg.   F.  Bucket  No.    1,   salt   and  inhibitor, 

13.5  deg.  F. 
3:40  p.  m.:  Bucket  No.  2,  salt  only,   14.5  deg.  F.  Bucket  No.   1,  salt  and  inhibitor, 

15  deg.  F. 
4:00  p.  m.:  Bucket   No.   2,   salt   only,    17   deg.   F.  Bucket  No.    1,  salt   and  inhibitor, 

17  deg.  F. 

Conclusions. — The  foregoing  tests  show  that  there  is  very  little,  if  any,  effect  on 
the  refrigerating  qualities  of  the  salt  and  ice  mixture  due  to  the  addition  of  the  sodium- 
dichromate  3  1 1  soda  ash  inhibitor. 


630 Track 

Test  to  Determine  Inhibitor  Concentration  in 
Brine  Dripping  from  a  Standing  Refrigerator  Car 

Purpose  of  Test. — To  ice  and  salt  one  end  of  a  bunker  of  a  standard  refrigerator 
car,  the  desired  proportions  of  inhibitor  being  added  to  the  salt  before  icing  the  car. 
To  collect  samples  of  the  brine  drippings  periodically  and  check  the  inhibitor  content. 

Description  of  Test  Car. — A  standard  refrigerator  car,  SFRD  4249,  was  used,  having 
the  following  inside  dimensions:  Length,  33  ft.  ^  in.;  width  8  ft.  2^  in.;  height, 
7  ft.  3  in.;  volume,  1,975  cu.  ft. 


Table  #1 

D 

i  n.G.W.  R 

R.  Laboratory 

Anoly 

.is  Of  A.A.R.  Corrosion  Tests 

Solutions. 

Car  i;o.   S.F.R.D.  Li2ii9 

Grains 

per  Liter  o 

C  Solution 

Date 

Time 

pH 

Salt 

Soda  Ash 

Sodium  Dichromate 

6-27 

10:00  AH. 

7.2 

2.3 

BlarJc 

rJlank 

10iU5  AM. 

8.2 

60.0 

.6279 

.6190 

11:00  AK. 

e.u 

96.0 

2-.5117 

2.6208 

12:00  Koon 

8.6 

ISC.O 

7.25fl 

7.3710 

2:00  PH. 

e.5 

22ii.O 

ii.i*653 

U.U772 

l4:00  PM. 

e.u 

2;;6.0 

U.i.653 

a.5318 

0:00  PM. 

e.u 

262.0 

3. 6280 

3.7128 

6-27/28 

12:00  Iloon 

8.fi 

280.0 

2.7908 

2.9I+8U 

6-28 

U:00  AI1. 

8.3 

260.0 

2.9303 

3.22U+ 

QiOO  Al-i. 

7.9 

250.0 

1.9536 

2.I8U0 

I:it5  P"' 

7.U 

268.0 

1«2557 

1.3102; 

5 1 00  PM. 

7.3 

262.0 

.6372 

.9282 

6:00  PM. 

7.7 

2U0.O 

.8372 

.6565 

6-26/29 

12i00  Koon 

7.5 

250.0 

•6977 

.6006 

6-29 

UtOO  AM. 

7.3 

23U.O 

.6977 

.U914 

10:00  AM. 

7.6 

186.0 

.Uie6 

.2181; 

2jO0  PM. 

7.6 

156.0 

.3I469 

.2181; 

h:U5  PK' 

7.8 

176.0 

.i(8SU 

.1638 

Procedure  of  Test.—T\iQ  test  was  made  at  the  Santa  Fe  Hobart  ice  plant  at  Los 
Angeles,  beginning  June  7,  1940.  It  was  desired  to  have  3.2  grams  of  sodium  dichromate 
per  liter  of  salt  solution  with  sufficient  soda  ash  added  to  bring  the  pH  value  to 
approximately  8,  which  amounts  of  dichromate  and  soda  ash  were  indicated  in  the 
laboratory  tests  last  year  as  being  most  desirable.  A  saturated  salt  solution  was  prepared 
from  regular  car  icing  salt,  and  the  water  used  in  making  the  ice.  This  solution  had 
a  pH  value  of  8  as  determined  by  visual  color  pH  indicator.  The  desired  amount  of 
sodium-dichromate  was  then  added  to  this  solution  and  it  was  found  that  the  pH  value 
was  lowered  considerably.  Soda  ash  was  then  added  and  the  amount  required  to  bring 
the  pH  value  back  to  8  was  determined.  The  ratio  of  salt  to  sodium-dichromate  by 
weight  in  this  mixture  was  calculated  to  be  60  to  1.  The  ratio  of  salt  to  soda  ash  by 
weight  was  calculated  to  be  70  to  1. 

The  salt  was  then  mixed  with  inhibitor  in  these  proportions.  The  regular  car  icing 
salt  used  was  a  rock  salt  and  came  packed  in  SS-lb.  quantities  in  burlap  sacks.  Four 
sacks  of  salt  (220-lb.)  were  placed  in  a  mixing  box  and  3  lb.  11  oz.  sodium-dichromate 
and  3  lb.  1  oz.  soda  ash  added  and  mixed.  The  mixture  was  then  resacked  and  the 
mixing  process  continued  until  the  required  amount  of  salt  had  been  prepared. 

Log  or  Tests. — (June  27,  1940) 

9:30  a.  m.:  Started  icing  car.  Three  300-lb.  cakes  of  ice  were  broken  in  large  chunks 
and  placed  in  one  end  of  bunker,  and  3,300  lb.  of  crushed  ice  was  added 
to  this  which  filled  the  bunker  2/i  full. 


Track 


631 


10:00  a.  m.:  550  lb.  of  salt  containing  inhibitor  was  spread  over  the  top  of  the  ice 

and  poled  down. 
10:45  a.  m.:   1,200  lb.  of  crushed  ice  added. 
10:50  a.  m.:  440  lb.  of  salt  with  inhibitor  added. 
11:00  a.  m.:  Remainder    of    bunker    filled    with    crushed    ice,    approximately    6,400   lb. 

total  used. 
11:10  a.  m.:   660  lb.  of  salt  with  inhibitor  added.  Total  salt   used,   1,650  lb.  Ratio  salt 

to  ice,  25.8  percent. 

June  28,  1940 
9:10  a.  m.:  Poled  ice  down  in  bunker — bunker  approximately  J^  full. 

June  29,  1940 
3:10  a.  m.:  Ice  poled  down  in  bunker — bunker  about  1/5  full. 

Results  of  Tests. — Table  1  shows  the  analysis  of  the  brine  drippings  from  this  test. 
This  analysis  was  made  by  the  Denver  &  Rio  Grande  Western  laboratory. 

The  desired  concentration  of  sodium-dichromate  in  the  brine  drippings  is  3.2  grams 
per  liter.  It  will  be  noted  for  the  first  few  hours  after  icing  the  car,  the  sodium- 
dichromate  concentration  was  considerably  over  this  figure.  At  the  end  of  24  hours  the 
ice  was  about  half  melted,  and  the  sodium-dichromate  concentration  was  somewhat  less 
than  3.2  grams  per  liter.  From  that  time  on  the  concentration  of  sodium-dichromate 
in  the  brine  drip  decreased  quite  rapidly.  The  pH  value  of  the  brine  drip  was  reasonably 
close  to  8  throughout  the  test. 

Inhibitor  Content  in  Brine  Drippings  on  Road  Test 

Purpose  of  Tests. — To  give  a  refrigerator  car  standard  icing  with  25  percent  salt 
containing   sodium-dichromate   and   soda    ash    inhibitor.     To    collect   samples   of   brine 


Log  of  Test  Run  -  Car  5012 


Loo»tioii 

Date 

Tina 
Icing 
Star tad 

Time 

Icing 

Completed 

A  End 
lea           Salt  4 
Adde<J       Inhibitor 
Lbs.         Added-Lba. 

B 
Ice 

Added 
Lbs. 

End 
Salt  4 
Inhibitor 
Added-Lbs. 

Hobart  loe  Plant 

6.28i440 

2.15 

ni 

5iU5  ™ 

7900 

1980 

1200 

- 

(») 

"         -         .. 

" 

5.30 

ra 

6i22  FU 

6700 

1980 

(a) 

"         -         •' 

6-29-Uo 

3i25 

PM 

5.55  PU 

1300 

355 

1600 

Uoo 

Dook,  Wilmington, Cal, 

.  6-30-Uo 

9iOO 

FU 

(b) 

Hobart  Io«  Plant 

7-l-Uo 

6i4o 

All 

7.00  AM 

2100 

523 

1500 

365 

- 

10(30 

AM 

1500 

380 

350 

87 

(0) 

Heedloa.  Cal. 

7-2-UO 

10i25 

AU 

10.55  AM 

1200 

330 

1200 

275 

Winalow,  Arix. 

7-5-Uo 

lii05 

AM 

U.30  AM 

500 

125 

650 

167 

Belan.  N.  11. 

5i05 

PU 

5.30  ™ 

275 

95 

750 

175 

CloTi*.  N.  U. 

7-U-Uo 

UiU5 

AM 

5.08  AM 

700 

175 

600 

150 

Argantim,  Eaaa. 

7-5-Uo 

2i05 

PM 

2.16  PU 

J  00 

75 

275 

69 

(a)  Ratio  of  salt  to  ioa  -  25.1  percent 

(b)  Car  loaded  with  32,530  lbs.  fish  livers  in  UO  lb.  tina 
(0)  Car  placed  in  train  at  Los  Angeles  at  11.30  AU. 


632 


Track 


FIQ.  I 
ANALYS/S  OF  BRINE  DRIPPIN(^5  FROM  REFRiqERATOR  CAR  5FRD  SOI 2 


^400 


I 


\^300 


200 


100 


\ 


G 

2 


10 


^ 


TW 


0) 


I 


Oesir-GcJ  pH   x^cisIljg  -g 


'b  8    8   e      e  OS     8    S8  8  8    d 


,  ° 

,9 

^  8   S  gg 

• 

g     8  '•  8    8  «> 

8  88     8 

80  •    8    J 

8  8 

0 

0 

8   8 


0 

• 

0 

• 

^ 

0 

•  1 

iS    8° 

0 

% 

0 

0 

^ 

Cte. 

y/r-ecTCt 

tnc&nfrc 

~fiori^  • 

B 

0 
>  0 

• 

••        0 

8 

1 

1     .     1 

• 
1     1     1 

1      1     1 

1     1     1 

8      • 

1     1     1 

0      • 

1     1     1 

V 

111. 

400 

300 

zoo 

too 

o 

3 

4 
2 
o 
10 


JUNE  Za  JUNE  29  JUNE  30     JUCT I 


JULYS     JULY  3      JULY  4       JULYS 


■>  O 


L-egend:  •  A  end  of  ccin 


drippings  during  a  regular  road  trip  with  car  loaded,  and  to  analyze  the  brine  drippings 
for  inhibitor  content. 

Description  oj  Test  Car. — Refrigerator  car  SFRD  SOI  2  was  used  for  this  test.  The 
capacity  of  this  car  was  92,100  lb.,  and  the  inside  dimensions  were  length,  40  ft.  1^  in.; 
width,  8  ft.  ZYz  in.;  height,  6  ft.  1^^  in.;  2,300  cu.  ft. 

Procedure  of  Test. — ^The  car  was  pre-iced  at  the  Santa  Fe  Railway  Hobart  ice  plant 
at  Los  Angeles  on  June  28,  1940.  Color  checks  on  the  brine  drippings  on  the  test  of  car 
4249  had  indicated  that  the  pH  concentration  was  higher  than  desired.  Also,  the  salt 
concentration  was  higher  than  originally  supposed.  Consequently,  the  amounts  of 
sodium-dichromate  and  soda  ash  were  decreased  for  this  test,  and  the  following  propor- 
tions were  used  in  the  mixture:  220  lb.  rock  salt;  3  lb.  sodium-dichromate;  2  lb.  soda 
ash.  The  solution  was  mixed  with  the  inhibitor  and  resacked  in  the  same  manner  as 
described  in  the  test  on  Car  No.  4249.  The  log  of  the  test  is  given  in  tabular  form. 

Results  of  Tests. — The  analyses  of  the  brine  drippings  from  this  test  as  determined 
by  the  D.  &  R.  G.  W.  laboratory  are  shown  graphically  in  Fig.  1. 

It  will  be  noted  that  again  in  this  test,  for  a  very  short  period  after  icing,  the 
dichromate  concentration  runs  high.  Throughout  the  test  run  a  considerable  variation 


Track 633 

was  found  in  the  dichromate  concentration,  but  the  general  average  was  not  far  below 
the  desired  concentration  of  3.2  grams  per  liter. 

The  pH  value  was  somewhat  lower  than  the  8  desired,  indicating  that  the  proportion 
of  soda  ash  should  be  somewhat  increased  over  the  proportion  used  in  this  test. 

Further  Work. — It  is  proposed  to  conduct  a  test  similar  to  the  above  on  a  brine 
tank  type  refrigerator  car.  The  series  of  tests  on  track  previously  mentioned  is  in 
progress.  Negotiations  are  also  being  conducted  with  salt  manufacturers  to  determine 
the  most  practical  manner  of  applying  the  inhibitor. 

The  National  Perishable  Freight  committee  has  made  a  canvas  of  principal  lines 
engaged  in  furnishing  refrigerator  service  for  perishable  traffic  to  determine  the  amount 
of  salt  used  in  this  service.  The  committee  advises  that  in  the  period  July  1,  1939,  to 
June  30,  1940,  37,500  tons  of  salt  were  used. 

To  protect  this  quantity  of  salt  with  inhibitor  would  cost  approximately  $85,000 
per  year  for  materials  only,  estimated  as  follows: 

Sodium-dichromate  (1/75  x  37,500  tons)   500  tons  @  $140  =  $70,000 
Soda  ash  (75  percent  of  500  tons)  375  tons  @  $40=  15,000 


Total    $85,000 


Report  on  Assignment  12 

Specifications  for  Laying  Rails  Designed  to  Set  Up  the 
Requirements  For  Good  Workmanship 

I.  H.  Schram  (chairman,  subcommittee),  Lem  Adams,  A.  L.  Bartlett,  W.  H.  Bettis, 
W.  H.  B.  Bevan,  F.  J.  Bishop,  L.  H.  Bond,  Armstrong  Chinn,  H.  R.  Clarke,  L.  W. 
Deslauriers,  H.  F.  Fifield,  H.  H.  Harman,  N.  M.  Hench,  F.  W.  Hillman,  E.  T.  How- 
son,  C.  T.  Jackson,  F.  J.  Jerome,  A.  A.  Johnson,  J.  H.  Kelly,  E.  E.  Martin,  F.  H. 
Masters,  J.  A.  Reed,  J.  F.  Shaffer,  G.  L.  Sitton,  G.  M.  Strachan,  J.  G.  Wishart. 

Last  year  your  committee  presented  as  information,  a  tentative  draft  of  Specifications 
for  Laying  Rail  (Proceedings  for  1940,  Vol.  41,  pages  599  to  601,  inclusive),  and  re- 
quested comments  and  criticisms  thereon.  These  specifications  with  minor  revisions  are 
now  submitted  with  the  recommendation  that  they  be  adopted  and  published  in  the 
Manual. 

SPECIFICATIONS  FOR  LAYING  RAIL 

The  location  shall  be  as  designated  by  chief  maintenance  officer  of  the  railroad. 
The  several  classes  of  rail  shall  be  laid  as  follows: 

Standard  Length 
Class  of  Rail  Feet  Color  or  Design  Use 

1st  quality —  39  Uncolored  Any  track — preferably  tangent. 

low  carbon: 

1st  quality —  39  Blue  end  Any  track — preferably  curves. 

high  carbon: 
1st  quality —  Yellow  end  Tangent     track — not     to     be     used 

"A"  Rails:  where  inspection  is  difficult. 

1st  quality —  Green  end  Any    track    (see    second    paragraph 

short  lengths:  under  unloading) 


634 Track 

Standard  Length 
Class  of  Rail  Feet  Color  or  Design  Use 

2nd  quality —  39  or  under  White  end  Any  tangent  track  or  curves  not  to 

exceed  3  deg.,  preferably  in  tracks 
used  largely  for  freight  or  where 
speed  does  not  exceed  SO  mph.  Not 
to  be  used  where  inspection  is  diffi- 

X  Rails:  39  or  under  Brown  end  cult.  Freight  tracks,  turnout  side  of 

side  tracks  or  where  designated  by 
chief  maintenance  officer. 

UNLOADING 

Rail  shall  be  unloaded  from  the  car  with  an  approved  derrick  or  crane  and  placed 
with  the  head  up  without  dropping,  with  sufficient  support  under  the  base  and  with  the 
brand  facing  toward  the  center  of  the  track. 

Rails  shall  be  unloaded  opposite  the  locations  in  which  they  are  to  be  placed  in  the 
track,  with  suitable  gaps  being  allowed  for  short  lengths.  Rails  shall  be  so  placed  that 
the  joints  in  each  line  of  rail  shall  be  not  more  than  30  inches  from  the  centers  of  the 
opposite  rails  and  preferably  not  more  than  18  inches.  Locations  of  joints  can  be  best 
determined  with  a  steel  tape. 

Proper  lengths  of  rail  for  road  crossings,  station  platforms,  bridges  and  other 
special  locations  shall  be  unloaded  in  a  safe  and  convenient  location,  where  they  will 
not  constitute  an  obstruction. 

To  minimize  the  cutting  of  new  full-length  rails,  short  rails  shall  also  be  distributed 
in  proper  places  to  provide  for  proper  spacing  at  insulated  joints  and  for  connections 
to  switches. 

No  rail  less  than  25  feet  long  shall  be  used  in  main  tracks  with  the  exception  that 
shorter  rails  not  less  than  14  feet  long  may  be  used  for  temporary  closures  and  for 
connections  within  turnouts. 

Joints,  turnouts  and  fastenings  shall  be  unloaded  and  distributed  concurrently  with 
the  rail,  except  that  small  material  shall  be  left  in  the  containers  until  the  time  of  laying 
the  rail. 

PREPARATION   OF   TRACK 

Track  shall  be  in  good  surface  prior  to  the  laying  of  new  rail,  and  where  curve 
realinement  work  will  require  heavy  throws,  such  work  shall  be  done  before  the  new 
rail  is  laid. 

No  portion  of  the  track  structure,  the  absence  of  which  will  impair  its  integrity, 
may  be  removed  prior  to  the  relaying  of  the  raO.  Full  flag  protection  or  slow-order 
protection,  as  may  be  necessary,  shall  be  provided  in  cases  where  rail  is  being  laid  under 
traffic. 

LAYING 

All  rail  ends  and  angle  bars  shall,  immediately  in  advance  of  laying,  be  painted  on 
the  contact  surfaces  with  a  lubricant  equal  to  black  lubricating  oil. 

Tie  plates  shall  have  a  full  and  uniform  bearing  on  ties  and  the  bearings  on  each 
tie  shall  be  in  the  same  plane.  Adzing  shall  be  done  where  necessary  to  fulfill  these  re- 
quirements. All  spike  holes  shall  be  plugged  with  treated  tie  plugs  after  the  old  spikes 
and  tie  plates  have  been  removed.  Creosote  oil,  heated  when  necessary,  shall  be  applied 
to  the  ties  after  adzing. 


Track 635 

Where  new  rail  is  to  be  laid,  the  track  shall  be  fully  tie  plated.  Where  possible, 
plates  shall  be  applied  after  preparation  of  tie  plate  beds  and  before  the  placing  of  the 
new  rail. 

Where  practical,  rail  shall  be  laid  against  the  current  of  traffic  on  double-track  lines 
and  against  the  predominant  tonnage  movement  on  single  track. 

Standard  expansion  shims  shall  be  placed  between  the  ends  of  adjacent  rails  to 
insure  the  proper  space  allowance  for  expansion  as  indicated  in  the  following  table: 

Temperattire  of  160  Joints  per  Mile          135  Joints  per  Mile 

rail,  degrees  F.  33-Foot  Rails  39 -Foot  Rails 

0  to    25 fs  inch  J4  inch 

26  to    SO yi  inch  -h  inch 

51  to    75 y&  inch  Ys,  inch 

76  to  100 -h  inch  t^  inch 

Over  100  None  None 

Where  metal  shims  are  used  they  shall  be  removed  to  within  12  rails  of  the  laying. 
Wooden  or  fiber  shims  need  not  be  removed. 

In  tunnels  where  the  temperature  is  above  70  degrees  F.,  rails  shall  be  laid  close 
without  bumping;  where  the  temperature  is  below  70  degrees  F.,  an  opening  of  ife  inch 
shall  be  allowed  (for  39-foot  rail)  for  each  20  degrees  F.  reduction  in  temperature. 

A  rail  thermometer  shall  be  used  to  ascertain  the  temperature  of  the  rail  and  in 
making  the  reading  it  shall  be  placed  on  the  rail  base  on  the  side  away  from  the  sun. 

Rails  shall  be  placed  one  at  a  time  except  that  in  cases  of  busy  traffic  where  trains 
cannot  be  diverted  to  other  tracks,  stretches  of  rail  not  over  20  in  number  may  be 
bolted  together  at  one  side  of  the  track  and  then  lined  into  place,  using  care  to  maintain 
the  expansion  allowance  uniformly.  Rails  shall  be  laid  without  bumping  or  striking  and 
with  the  ends  square. 

Rails  shall  be  laid  or  installed  so  that  joints  will  not  be  placed  in  road  crossings 
within  the  limits  of  switch  points  or  guard  rails,  or  within  6  feet  of  the  ends  of  open- 
floor  bridges.  Where  rails  longer  than  standard  are  needed  for  such  locations,  they  shall 
be  at  least  60  feet  long. 

Rail  joints  shall  be  applied  before  the  track  is  spiked,  the  joint  bars  to  be  lined 
up  with  rail  in  vertical  position  and  the  bolts  tightened  by  starting  in  the  middle  of  the 
joint  and  working  towards  the  ends.  Spring  washers  or  other  similar  approved  appliances 
shall  be  used. 

Spikes  shall  be  driven  vertically  with  the  face  of  the  shank  in  contact  with  the 
base  of  the  rail,  and  shall  be  so  driven  that  it  will  not  be  necessary  to  straighten  them 
during  driving.  Spikes  shall  be  so  staggered  that  all  the  outside  spikes  shall  be  on  the 
same  side  of  the  ties  and  all  the  inside  spikes  on  the  opposite  side. 

The  full  quota  of  rail  anchors  shall  be  applied  prior  to  the  passage  of  a  train  over 
the  new  rail. 

In  laying  the  second  line  of  rail,  gaging  shall  be  done  at  least  at  every  third  tie. 

When  necessary  to  make  a  temporary  connection  for  the  passage  of  a  train,  the 
union  shall  be  made  with  a  rail  of  the  section  being  renewed.  The  closure  rail  shall 
not  be  less  than  14  feet  long,  and  shall  be  connected  to  the  new  rail  by  a  compromise 
joint  if  the  rails  are  of  different  sections.  The  connection  rail  shall  have  a  full  number 
of  bolts  and  spikes.  At  the  completion  of  a  day's  work  a  short  section  of  new  rail  not 
less  than  18  feet  long  shall  be  used  in  making  the  closure  and  shall  be  connected  to  the 
old  rail  with  a  compromise  joint. 


636 Track 

COMPLETION  OF  WORK 

All  rail  laid  down  on  any  given  day  shall  be  fully  spiked  and  bolted  at  the  dose 
of  the  day's  work.  Bolt  holes  made  in  the  field  shall  be  drilled  and  not  burned  with  a 
torch. 

After  rail  has  been  laid  the  tops  of  adjacent  rail  ends  shall  be  ground  to  a  level 
surface. 

Rail  ends  shall  be  cross  slotted  and  beveled  at  mill  or  as  soon  after  laying  as  required. 

Markings  indicating  the  classification  of  released  rail  shall  be  placed  on  it  promptly, 
and  such  rail  and  its  fixtures  loaded  promptly. 

It  is  desirable  that  other  renewals  of  track  material  shall  follow  raD  laying  as 
promptly  as  possible. 

All  ties  on  which  the  new  rail  does  not  have  a  full  bearing  shall  be  tamped  and  the 
spikes  re-driven;  proper  slow  orders  shall  be  maintained  until  this  is  done.  If  weather 
conditions  do  not  permit  this  work  to  be  carried  out,  any  loose  ties  may  be  temporarily 
shimmed. 

Where  necessary,  bolts  shall  be  given  a  second  tightening.  After  the  ballasting  and 
resurfacing  of  the  track  have  been  completed  the  bolts  shall  be  tested  and,  if  required, 
brought  to  a  pre-determined  tension. 


Report  on  Assignment  13 

Spirals  for  High  Speed  Operation 

Collaborating  with   Committee   16 — Economics  of  Railway 
Location  and  Operation 

C.  W.  Baldridge  (chairman,  subcommittee),  A.  L.  Bartlett,  L.  H.  Bond,  Armstrong 
Chinn,  H.  R.  Clarke,  L.  W.  Deslauriers,  H.  F.  Fifield,  H.  H.  Harman,  F.  W.  Hill- 
man,  E.  T.  Howson,  C.  T.  Jackson,  J.  H.  Kelly,  K.  R.  McLennan,  J.  B.  Mvers, 
G.  A.  Peabody,  G.  L.  Sitton,  J.  G.  Wishart. 

The  committee  recommends  that  the  matter  now  in  the  Manual,  page  S-26,  begin- 
ning with  the  sub-heading  "Staking  Spirals  by  Offsets"  and  ending  on  page  S-27  with 
the  line  above  the  sub-heading  "Staking  Spirals  by  Deflections"  be  withdrawn  from  the 
Manual  and  that  the  following  matter  be  adopted  for  inclusion  in  the  Manual  and 
inserted  following  the  matter  which  is  now  on  page  S-28 

Staking  Spirals  by  Offsets 
Calculating  the  Curve 

When  the  degree  of  the  circular  curve  is  known  and  the  length  of  spiral  has  been 
decided  upon,  the  angle  A  and  the  angle  to  each  "end  of  chord"  point  are  found  in  the 
same  manner  as  for  staking  the  spiral  by  deflections.  The  offset  for  each  "end  of  chord" 
point  then  may  be  found  by  formulas  (5),  (6)  and  (7)  given  on  page  S-2S.  Formula 
(5)  will  determine  the  length  of  Chord  C,  which  is  used  in  formulas  (6)  and  (7). 

Formula  (6)  will  give  the  length  of  X,  which  is  the  distance  to  be  measured  along 
the  tangent  TS.  toward  P. I.  and  formula  (7)  gives  the  lengths  of  offsets  to  be  measured 
at  right  angles  to  the  tangent  at  the  distance  X  for  the  respective  "chord  and  point." 
The  points  so  located  form  the  center  line  of  the  spiral. 


Track 637 

To  avoid  long  calculations  and  tedious  field  work,  all  offsets  should  be  staked  from 
the  tangent — TS.  to  PJ. 

Another  method  for  staking  spirals  by  offsets  which  is  particularly  convenient 
where  it  is  desired  to  locate  any  point  in  the  spiral  which  must  be  accurately  staked  at 
other  than  the  end  of  chord  points,  is  as  follows: 

Alternate  Method 

The  spiral  may  be  staked  by  offsets,  one  half  being  offset  from  the  tangent  and  the 
other  half  from  the  circular  curve,  by  making  the  offsets  vary  directly  as  the  cube  of  the 
distance  from  the  TS.  for  one  half  and  from  the  S.C.  for  the  other  half. 

The  length  of  the  spiral  and  the  offset  between  the  tangent  and  the  circular  curve 
are  determined  by  the  following  formulas: 

88 
L=j^ES  (1) 

o=T^=°°^^^^«  ^^  (^  +  ^) ^'^ 

in  which 

E  =  elevation  in  inches 
S  =  speed  in  miles  per  hour 
D  =z  degree  of  curve 
L  nz  length  of  spiral  in  feet 
0  =  tangent  offset  in  feet 

In  these  formulas  the  values  of  E  and  S  must  be  in  accordance  with  the  formula  in 
the  Manual,  page  S-42.  The  length  provides  for  a  run-off  of  1^4  inch  per  second  and  the 
tangent  offset  is  independent  of  the  degree  of  curve,  provided  the  relations  of  L,  E,  and 
5  are  observed. 

The  following  table  gives  these  offsets. 

OS  set  Elev.  OS  set         Elev.  Offset 

(Inches) 

(Feet)       (Inches)       (Feet)       (Inches)      (Feet) 

1/2                             0.013  2%  0.660  5  3.034 

3A    0.032  3  0.819  5^4  3.449 

1                                       0.061  3y4  1.001  S^  3.900 

114            0.101  3^  1.208  5^  4.388 

11/2                             0.1S4  3^  1.440  6  4.914 

154    0.221  4  1.699  61/4  5.481 

2                           0.303  4^  1.986  6^  6.088 

214    0.403  4J4  2.304  6^4  6.738 

21/4    0.521  4^  2.652  7  7.432 

Intermediate  points  on  the  spiral  may  be  set  conveniently  by  dividing  each  half 
length  into  five  equal  chords  and  setting  off  at  the  chord  points  right-angle  or  normal 
offsets,  as  the  case  may  be,  equal  respectively  to:  0.004,  0.032,  0.108,  0.256,  and  0.500  of 
the  main  offset. 

Points  on  the  spiral  between  the  chord  points  may  be  set  by  using  the  equation 
of  the  curve: 

y  =  -J^^ (3) 

34380L 

in  which  x  and  y  are  the  coordinates  from  the  TS.  as  origin.  The  ordinates  so  deter- 
mined are  used  as  right-angle  offsets  for  the  half  of  the  curve  laid  off  from  the  tangent 
and  as  normal  offsets  for  the  half  laid  off  from  the  circular  curve. 


638 Track 

The  simple  relations  among  degree  of  curvature,  speed,  elevation,  length  of  spiral, 
and  spiral  offset  set  forth  in  equations  (1)  and  (2)  afford  a  ready  means  for  selecting 
the  spiral  and  adjusting  the  speed  and  elevation  to  the  particular  conditions  at  the  site. 
This  facility  of  selection  exists  regardless  of  whether  the  actual  staking  of  the  curve  be 
done  by  deflections  or  by  offsets. 


The  committee  recommends  that  the  matter  as  outlined  for  inclusion  in  the  Manual 
be  adopted  and  that  the  subject  be  discontinued. 


Report  of  Committee  4 — Rail 

W.  H.  Penfield,  C.  J.  Geyer  Robert  Faries*, 

Chairman,  F.  M.  Graham  Vice-Chairman, 

J.  B.  Akers  G.  W.  Harris  Philip  Petri 

J.  E.  Armstrong  E.  M.  Hastings  G.  A.  Phillips 

W.  J.  Backes  B.  Herman  B.  H.  Prater 

W.  C.  Barnes  F.  S.  Hewes  A.  N.  Reece 

L.  H.  Bond  W.  H.  Hillis  J.  C.  Ryan 

N.  J.  Boughton  Maro  Johnson  L.  H.  Scheifele 

C.  B.  Bronson  W.  H.  Kirkbride  R.  T.  Scholes 

W.  J.  Burton  C.  S.  Kirkpatrick  F.  S.  Schwinn 

H.  a.  Cassil  B.  R.  Kulp  G.  R.  Smiley 

E.  E.  Chapman  G.  M.  Magee  A.  N.  Talbot 

H.  R.  Clarke  R.  W.  Marye  J.  C.  Wallace 

E.  J.  Cullen  Ray  McBrian  Barton  Wheelwright 
W.  A.  Duff  C.  E.  Morgan  W.  P.  Wiltsee 

J.  M.  Farrin  J.  V.  Neubert**  R.  P.  Winton 

P.  O.  Ferris  E.  E.  Oviatt  Louis  Yager 

F.  W.  Gardener  J.  C.  Patterson  Committee 

*  Died  September  8,   1940. 
**  Died  June  4,   1940. 

To  the  American  Railway  Engineering  Association: 
Your  committee  reports  on  the  following  subjects: 

1.  Revision  of  Manual. 

Progress  report.  Revised  forms  for  recording  rail  failures  recommended  for  adoption 
to  replace  corresponding  material  now  in  Manual  page  641 

2.  (a)  Further  research,  including  details  of  mill  practice  and  manufacture  as  they 
affect  rail  quality  and  rail  failures,  giving  special  attention  to  transverse  fissure  failures 
and  other  defects  in  the  head,  web  and  base,  collaborating  with  Rail  Manufacturers' 
Technical  Committee. 

Progress  report,  presenting  Seventh  Progress  Report  of  the  Rails  Investigation  with 
resume  of  accomplishments  to  date  and  outline  of  work  for  1941    page  681 

(b)  Specifications  for  thermal  treatment  of  rail,  such  as  controlled  cooled, 
Brunorized,  etc. 

Progress  report.  Included  in  above  Seventh  Progress  Report  of  the  Rails 
Investigation   page  681 

3.  Compilation  of  statistics. 

(a)  All  rail  failures,  making  special  study  of  transverse  fissure  failures. 

Progress  report,  presented  as  information   pages  645  and  6.'>0 

(b)  Compilation  of  statistics  for  determining  the  performance  of  controlled  cooled 
and  Brunorized  rail  in  service  with  respect  to  rail  failures  with  view  toward  evaluating 
the  higher  price  paid  for  treated  than  for  untreated  rails. 

Progress  report,  presented  as  information    page  656 

4.  Cause  and  prevention  of  rail  battering  and  methods  of  reconditioning  rail  ends. 
Progress  report,  presented  as  information    page  658 

5.  Economic  value  of  different  sizes  of  rail. 

Progress  report,  presented  as  information    page  650 

Bulletin  423,   February,    1941. 

639 


640 Rail 

6.  Continuous  welding  of  rail,  collaborating  with  Committee  S — ^Track  and  Special 
Committee  on  Stresses  in  Railroad  Track. 

Progress  report,  presented  as  information   page  660 

7.  Service  tests  of  various  types  of  joint  bars. 

Progress  report,  presented  as  information   ." page  662 

8.  Investigate  joint  bar  failures  and  give  consideration  to  revision  of  design  and 
specifications. 

Progress  report,  presented  as  information    page  666 

Supplementary  monograph  by  W.  B.  Leaf,  presented  as  information   ....  page  672 

9.  Corrugated  rail,  causes  and  remedy.  Effect  upon  riding  qualities  of  tracks  and 
upon  the  costs  of  track  and  equipment  maintenance. 

No  report. 

The  Committee  on  Rail, 
W.  H.  Penfield,  Chairman. 

iSugtisit  Jf .  JilacKsi 

August  F.  Blaess,  retired  chief  engineer  of  the  Illinois  Central  System,  died  at  his 
home  in  Gulfport,  Miss.,  on  February  19,  1940. 

By  reason  of  his  attainments  and  his  earnest  and  unselfish  service  in  connection  with 
the  activities  of  Comittee  4 — Rail,  he  enjoyed  the  highest  personal  respect  and  esteem 
of  its  members. 

The  members  of  the  committee  take  this  opportunity  to  record  the  loss  suffered 
in  the  death  of  August  F.  Blaess. 

The  Committee  on  Rail 

3iSiObert  jFatios 

Robert  Faries,  assistant  chief  engineer-maintenance,  Pennsylvania  Railroad  System, 
died  at  Philadelphia  on  September  8,  1940. 

He  served  for  a  period  of  eight  years  as  a  member  of  Committee  4 — Rail,  and  was 
vice-chairman  at  the  time  of  his  death. 

By  ability  and  untiring  effort,  he  achieved  an  outstanding  position  in  the  railway 
engineering  field.  Through  his  unassuming  leadership  and  wide  knowledge  of  the  subject 
he  greatly  advanced  the  work  of  the  committee.  His  sterUng  quaUties  as  a  man  and 
kindly  character  endeared  him  to  all  his  associates. 

The  members  of  Committee  4 — Rail  have  suffered  a  great  loss  through  the  death  of 
Robert  Faries. 

The  Committee  on  Rail 

3rof)n  ^.  i^cubcrt 

John  V.  Neubert,  chief  engineer  maintenance  of  way  of  the  New  York  Central 
System,  died  at  New  York  on  June  4,  1940. 

Mr.  Neubert  served  for  a  period  of  12  years,  from  1928  until  the  time  of  his  death, 
as  a  member  of  Committee  4 — Rail,  during  which  period  he  was  chairman  of  the 
committee  for  the  four  years  from  1936  to  1940. 

By  his  outstanding  abiUty,  his  unselfish  and  unstinting  service,  and  his  leadership, 
he  markedly  advanced  the  work  of  the  committee.  His  qualities  of  character  and 
personality  endeared  him  to  each  member. 

The  members  of  Committee  4 — Rail,  unanimously  record  the  feeling  of  irreparable 
loss  occasioned  by  the  death  of  John  V.  Neubert. 

The  Committee  on  Rail 


Rail  641 


Report  on  Assignment    1 

Revision  of  Manual 

C.  B.  Bronson  (chairman,  subcommittee),  J.  E.  Armstrong,  W.  C.  Barnes,  N.  J. 
Boughton,  W.  J.  Burton,  E.  E.  Chapman,  W.  A.  Duff,  J.  M.  Farrin,  F.  M.  Graham, 
G.  W.  Harris,  E.  M.  Hastings,  B.  Herman,  Maro  Johnson,  B.  R.  Kulp,  E.  E.  Oviatt, 
W.  H.  Penfield,  A.  N.  Reece,  L.  H.  Scheifele,  G.  R.  Smiley,  Barton  Wheelwright, 
Louis  Yager. 

Form  402-C.  Yearly  Summary  of  Rail  Failures 

Your  committee  has  found  it  desirable  to  revise  Form  402-C.  Yearly  Summary  of 
Rail  Failures,  in  order  to  separate  the  compound  from  the  transverse  fissures,  and  to 
eliminate  the  columns  showing  carbon  content  and  rail  failure  rate  at  the  end  of  the 
form.  These  two  columns  are  not  used  in  the  compilation  of  the  data  issued  yearly. 
A  number  of  corrections  have  also  been  made  in  the  Instructions  for  Filling  in  Rail 
Failure  Form  402-C,  the  principal  purpose  of  which  is  to  bring  it  up  to  date  and  in  line 
with  present  practice. 

The  revised  Form  402-C,  Rev.,  1941  and  the  instructions  shown  as  402-C  (a),  Rev., 
1941,  are  recommended  for  adoption  and  printing  in  the  Manual  as  substitutions  for 
those  shown  on  pages  4-47  and  4—48  in  the  Manual. 

Form  402-E.  Statement  of  Transverse  Fissure  Rail  Failures 

Your  committee  has  also  found  it  desirable  to  revise  Form  402-E.  Statement  of 
Transverse  Fissure  Failures,  because  the  reports  as  now  sent  in  are  so  voluminous  that 
a  large  amount  of  work  is  required  from  the  railroads  and  the  engineer  of  tests.  The 
form,  as  revised,  provides  all  of  the  essential  data  for  tabulation  of  the  annual  reports, 
and  eliminates  the  reporting  by  individual  heat  numbers  which  do  not  enter  into  the 
statistics,  and  are  not  required  for  this  purpose.  A  trial  has  been  made  of  the  revised 
form  herewith  presented  and  it  has  proved  satisfactory.  Minor  revisions  have  also  been 
made  in  the  Instructions  for  Filling  in  Transverse  Fissure  Rail  Failure  Form  402-E  in 
conformity  with  it. 

The  revised  Form  402-E,  Rev.,  1941  and  the  instructions,  shown  as  402-E  (a),  Rev., 
1941,  are  recommended  for  adoption  and  printing  in  the  Manual  as  substitutions  for 
those  shown  on  Pages  4-49  and  4—50  in  the  Manual. 

Form  402-C  (a) 
Issued  1931 
Revised  1935,  1941 
ASSOCIATION  OF  AMERICAN  RAILROADS 

Enginxering  Division 

Instructions  for  Filling  in  Rail  Failure  Form  402-C,  Rev.  1941 

1.  Statistics  are  desired  for  all  new  rail  weighing  80  lb.  per  yd.  and  over,  laid  in  all  main  tracks. 
Continue  records  10  years  unless  rail  has  been  removed  from  main  tracks  where  originally  laid. 
Omit  information  for  rollings  of  less  than   SOO  tons. 

2.  Do  not  include  in  this  report  rails  broken  or  injured  by  wrecks,  broken  wheels  or  similar  causes, 
wheel    burned,   battered   or   chipped-end   rails  and   those   replaced   on   account   of  wear. 

3.  Fill  in  the  information  for  rollings  in  which  there  were  no  failures  as  well  as  those  in  which  there 
were  failures. 

4.  Report  all  rail  failures,  listing  separately  in  the  proper  columns  under  general  heading  "Number  of 
Failures"  those  which  broke  in  service  and  those  removed  from  track  as  a  result  of  the  use  of 
detector  cars. 

5.  Express  the  tonnage  of  rails  and  the  mile-years  in  whole  numbers,  the  mileage  in  whole  numbers 
and  hundredths. 

6.  Under  "Kind  of  Steel"  indicate  Open-Hearth  by  "OH",  Intermediate  Manganese  by  "IM"  or  "MM", 
Brunorized    by    "BR",    Controlled    Cooled    by    "CC",    and    if    end    hardened,    add    "H".  For   other 


642 Rail 

special  steels  and  processes,  assign  suitable  abbreviations  and   if  not  obvious,   indicate  meanings  by 
footnotes. 

7.  It  is  important  that  the  report  indicate  clearly  the  mill  at  which  the  rails  were  rolled.  A  list  of 
mills  which  have  rolled  rails  during  recent  years  is  given  here  together  with  the  corresponding 
designations  which  should  be  entered  under  "Mill." 

Name  oj  Company  Name  of  Mill  Location  Designation 

Algoma  Steel  Co Algoma  Sault  Ste.  Marie,  Ont.,  Can.  . .  Alg. 

Bethlehem  Steel  Co Lackawanna Lackawanna,  N.  Y Lack. 

Bethlehem  Steel  Co Maryland Sparrows  Point,  Md Md. 

Bethlehem  Steel  Co Steelton   Steelton,  Pa Stltn. 

Carnegie-Illinois  Steel  Co Edgar  Thomson   . . .    Braddock,  Pa Cam. 

Carnegie-Illinois  Steel  Co Gary  Gary,  Ind Gary 

Colorado  Fuel  &  Iron  Co Minnequa Pueblo,  Colo Colo. 

Dominion  Iron  &  Steel  Co Dominion  Sydney,  Nova  Scotia  Dom. 

Inland  Steel  Co Inland Indiana  Harbor,  Ind Inld. 

Tennessee  Coal,  Iron  &  R.  R.  Co Ensley   Ensley,  Ala Tenn. 

8.  In  the  first  three  columns  which  call  for  two  entries  for  each  item,  enter  "Mill,"  "Year  Rolled" 
and  "Section"  on  the  first  line  (opposite  "This  Year")  and  "Kind  of  Steel,"  "Year  Laid"  and 
"Lb.  per  Yd."  on  second  line  (opposite  "Total"). 

9.  Include  horizontal  split  heads  (horizontal  fissures)   under  "Other  Head"  failures. 

10.  To  convert  tons  into  track  miles,  the  number  of  tons  may  be  divided  by  the  figures  given  below, 
which  show  the  tons  (2,240  lb.)  of  rail  per  mile  of  single  track  for  different  weights  per  yard 
of  rail. 

80  lb.  RA-A  125.71  tons  112  lb.  RE  176.79   tons 

90  lb.  RA-A  141.43  "  127  lb.  NYC  200.04 

100  lb.  RA-A  157.77  "  130  lb.  RE  203.65 

100  lb.  RA-B  157.93  "  131  lb.  RE  205.54 

100  lb.  RE  159.50  "  136  lb.  LV  214.03 

105  lb.  NYC  165.00  "  152  lb.  PRR  238.23 

110  lb.  RE  172.86  " 

11.  Each  line  for  the  different  year's  rollings  should  be  completely  filled  in  without  the  use  of 
ditto  marks. 

12.  Report  only  the  failures  for  the  year  ending  December  31  opposite  the  lines  "This  Year"  and  all 
failures  from  date  laid  to  December  31  opposite  the  lines  "Total." 

13.  In  the  column  "Mile-Years"  there  should  be  entered  opposite  the  line  "This  Year"  the  actual 
quantity  in  miles  of  rail  in  service  for  the  individual  year.  Opposite  "Total"  the  quantity  should 
be  the  summation  of  the  miles  in  service  for  each  year  from  date  of  rolling.  These  amounts  con- 
stitute the  divisors  for  reducing  the  corresponding  number  of  failures  to  a  100  mile-year  basis, 
instead  of  the  quantity  in  miles  originally  laid,  which  was  used  as  the  divisor  up  to  the  year  1922. 

14.  For  Purposes  of  Reporting  Service  of  Rails:  Rail  laid  in  any  month  in  the  year  that  the  report  is 
made  is  considered  to  have  zero  years  age,  hence  zero  mile-years  of  service.  Rail  laid  in  any  month 
in  the  year  preceding  the  year  of  the  report  shall  be  considered  as  having  one  year's  service. 
Follow  a  corresponding  rule  for  rail  laid  in  preceding  years. 

For  Example: 
Assume  30  miles  of  rail  rolled  in  calendar  year   1937   of  which 
10  miles  are  laid  in  calendar  year  1937  and 
20  miles  are  laid  in  calendar  year  1938. 
None  of  this  rail  removed  from  track  prior  to  1940. 

The  reports  for  succeeding  years  would  show  service  of  these  rails  as  follows: 

Date  oj  Report 

Dec.   31,   1937    


Dec.  31,   1938 


Dec.  31,   1939 


Equiv. 

Year  Rolled 

Year  JLaid 

Track  Mi. 

Mi.    Yrs. 

Period 

1937 

1937 

10 

0 
0 

This  Year 

Total  to  Date 

1937 

1937 

10 

10 
10 

This  Year 

Total  to  Date 

1937 

1938 

20 

0 
0 

This  Year 
Total  to  Date 

1937 

1937 

10 

10 
20 

This  Year 
Total  to  Date 

1937 

1938 

20 

20 
20 

This  Year 
Total  to  Date 

IS.  In  case  of  doubt  as  to  the  interpretation  of  Form  402-C  or  of  any  of  these  instructions,  write  to  the 
Engineer  of  Tests,  Rail  Committee,  Association  of  American  Railroads,  59  East  Van  Buren  Street. 
Chicago,  111. 


Rail 


643 


^                                    ASSOCIAT/ON    OF  AMER/CAN  RAILROADS                                      r\°^e^'^ 
yJ                                                                      ENGINEERING  DIVISION                                                                         vj 
RAIL  FAILURES  FOR  YFAR  ENDING  DECEMBER  31. 19....       RAILROAD. SHEET  NO...  OF... 

1   5 

-J 
l|3 

8^1 

1 

1 

NUMBER   OF  FAILURES 

TRAN.  FISS- 

COMP  FISS 

OTHERHEAD 

BROKEN 

tySB 

BASE 

TOTAL            1 

SERV 

DET. 

SERy 

DET 

SERV 

DET 

SERV 

DET 

SERV 

DET 

SERV 

DET 

SERV 

DET 

THISVK 
TOTAL 

THISm. 
TTXTAL 

THISYK 
TOTAL 

THisya 

TOTAL 

THism 

TOTAL 

THisyn 
TOTAL 

THISrK 
TOTAL 

THISYft 
TOTAL 

THISylt 
TOTAL 

T?IISyK 
TOTAL 

THisyn 

TOTAL 

misnt 

TOTAL 

W  FILL/NO  OUT  THIS  fO»M,    FOLUOty   WSTfiUCT/O/VS  ON  FORM   ■tX-Cb)  REV  1941                                                                                      1 
THIS  FORM  tVM£N  FILLED  OUT  SHOULD  BE  HETVHHEO  TO  THE  ASSOCI-i  TION  OF  AMERICAN  RAILROiUS, » E  V/W  BUftEfJ  ST,  CHICAOO.  ILL      \ 

o 


o 


ASSOCIATIOI^I  OF  AMERICAN  RAILROADS 
ENGINEERING     DIVISION 

c"^-iRlS5^RTH     STATEMENT  OF  TRANSVERSE  FISSURE  RAIL  FAILURES  ^^l^' 

MM    -  MEDIUM nUMG*NESE  _  _  ftny  l!t»l 

CC     -CONTROLLLDCOOLEO        FROM. 19 TO ...19 RAILiVAY. SHEET  NO... OF... 

BR      -  BRUNORIZEO 


RAIL 

TAIU/HEi 

RAIL 

FAILURES 

RAIL 

FAILURE^ 

KIND 

OF 

STEEL 

LB 

PER 

YD 

SfCT- 
lON 

MILL 

YEAR 

miFc 

1 

1 

KIND 

OF 
STEEL 

LB 
P£R 
YD 

5ECT 
lON 

MILL 

YEAH 
ROIUD 

^ 
^ 

% 

^ 

\ 

KIND 

OF 

STEEL 

LB. 

PER 

YD 

SECT- 
ION 

MILL 

YEAR 

^ 
1 

i 

MOIV  MANY  MAIN   TRACK  MILES  ARE   IN  THE  TERR/TORf   IN  WHICH    YOC/  REPORT   FISSURE   FAILURES P 
IS  THIS   THE  SAME  TERRITORY  AS  THAT  IN  WHICH   YOU  REPORT  GENERAL.  RAIL  FAILURES  ON  FORM  401-C  /» 

ffEPORT    TRAAISI^ERSE    FISSURE  RAIL.   FAILURES    ONLY     FOLLOW  INSTRUCTIONS  ON  FORM   40JE-(a)  REV  1941 

THIS  STATEMENT  SHOULD  BE  RETURNED  TV  THE  ASSOCIATION  OF  AMERICAN  RA/LROAOS.  S9E  VAN  BUREN  ST.  CHICAOO.  . 


644  Rail 


Form  402-E  (a) 
Issued  1931 
Revised  1941 
ASSOCIATION  OF  AMERICAN  RAILROADS 
Engineering  Division 

Instructions  for  Filling  in  Transverse  Fissure  Rail  Failure 

Form  402-E,  Rev.  1941 

1.  Report  is  desired  on  all  transverse  fissure  rail  failures  in  rail  weighing  80  lb.  per  yard  and  over, 
laid  in  all  main  track.  Comjwund  fissures  and  horizontal  fissures  (horizontal  split-heads)  are  NOT 
to  be  reported. 

2.  The  report  year  ends  on  December  31.  Statement  of  transverse  fissure  rail  failures  will  be  made 
quarterly,  listing  the  rails  that  have  failed  during  the  quarters  ending  March  31,  June  30, 
September  30  and  December  31. 

3.  Under  "Rail"  enter  information  from  brand  on  rail  except  that  under  "Mill"  the  following  mill 
designations  should  be  used  to  make  identification  positive. 

Name  of  Company  Name  oj  Mill  Location  Designation 

Algoma  Steel  Co Algoma   Sault  Ste.  Marie,  Ont.,  Can.    .  .  Alg. 

Bethlehem  Steel  Co Lackawanna   Lackawanna,  N.  Y Lack. 

Bethlehem  Steel  Co Maryland   Sparrows  Point,  Md Md. 

Bethlehem  Steel  Co Steelton   Steelton,  Pa Stltn. 

Bethlehem  Steel  Co Saucon   South  Bethlehem,  Pa Sauc. 

Bethlehem  Steel  Co Cambria Johnstown,  Pa Camb. 

Carnegie  Steel  Co Edgar  Thomson  .  .  .    Braddock,  Pa Cam. 

Colorado  Fuel  &  Iron  Co Minnequa    Pueblo,  Colo Colo. 

Dominion  Iron  &  Steel  Co Dominion Sydney,  Nova  Scotia Dom. 

Illinois  Steel  Co Gary   Gary,  Ind Gary 

Illinois  Steel  Co South  Works   South  Chicago,  111 SoWk. 

Inland  Steel  Co Inland   Indiana  Harbor,  Ind Inld. 

Lackawanna  Iron  &  Steel  Co Scranton    Scranton,  Pa Scrn. 

Tennessee  Coal,  Iron  &  R.  R.  Co Ensley  Ensley,  Ala Tenn. 

Germany   Germ. 

4.  Report  all  transverse  fissure  rail  failures  whether  detected  by  test  cars  or  other  testing  devices  or 
disclosed  by  inspection  or  by  actual  breakage  in  service. 

5.  List  the  total  service  failures,  occurring  in  any  one  year  of  rolling  of  any  one  mill,  being  from  rail 
identical  in  kind  of  steel,  pounds  per  yard,  and  section,  in  column  headed  "Service".  Likewise,  list 
the  total  detected  failures,  occurring  in  any  one  year  of  rolling  of  any  one  mill,  being  from  rail 
identical  in  kind  of  steel,  pounds  per  yard,  and  section,  in  column  headed  "Detected". 

6.  Should  any  railroad  furnishing  this  report  not  consent  to  its  publication,  notice  to  that  effect  should 
be  given  on  sheet  1,  of  the  form. 

7.  Include  in  this  report  all  transverse  fissure  rail  failures  with  as  much  of  the  information  as  may  be 
available;  not  omitting  to  report  any  failures  because  part  of  the  information  is  not  available. 

8.  Double  space  all  entries  and  make  each  complete  without  use  of  ditto  marks. 

9.  Answers  to  questions  appearing  at  bottom  of  Form  402  E  need  be  answered  on  first  sheet  only  of 
each  quarter's  report. 

10.  In  case  of  doubt  as  to  the  interpretation  of  Form  402  E,  or  any  of  these  instructions,  write  to  the 
Engineer  of  Tests,  Rail  Committee,  Association  of  American  Railroads,  59  E.  Van  Buren  St., 
Chicago,  111. 


Rail 


64S 


Report  on  Assignment  3  (a) 

Rail  Failure  Statistics 

Part   1 — General  Rail  Failures 

By  W.  C.  Barnes,  Engineer  of  Tests,  Rail  Committee 

The  rail  failure  statistics  for  the  year  ended  December  31,  1939,  appearing  in  this 
report,  have  been  compiled  in  accordance  with  the  standard  method  of  basing  the  failure 
rates  on  mile-years  of  service  in  track. 

The  reported  tonnages  and  track  miles  of  rollings  for  1934  and  succeeding  years, 
included  in  these  statistics,  are  as  follows: 

Year  Rolled  Tons  Track  Miles 

1934    640,299  3,456 

1935     364,103  1,998 

1936    733,221  3,994 

1937    821,684  4,489 

1938    372,035  2,069 

Total     2,931,342  16,006 

This  compares  with  totals  of  2,717>949  tons,  or  14,743  track  miles,  of  rail  reported  last 
year  for  the  1933  to  1937  rolhngs. 

TABLE  I  -  AVERAGE  FAILURES  FCR  100  TRACK  lOLES  -  AIL  mUS 
(Both  servloo  and  detected  failures  are  Included) 


Table  1  shows  the  average  number  of  failures  per  100  track  miles  of  rail  in  service 
which  accumulated  during  the  one  to  five  years'  service  in  the  rail  reported  from  rollings 
of  1934  to  1937,  inclusive,  from  all  mills,  together  with  similar  rates  of  older  rollings 
reproduced  from  previous  reports.  Both  service  and  detected  failures  in  all  kinds  of 
steel  are  included  in  this  table. 


646 


Rail 


The  1934  rollings,  whose  period  of  observation  is  now  concluded,  show  an  average 
rate  of  35.8  failures  per  100  track  miles  for  the  five  year  period.  This  rate  is  approxi- 
mately one-half  that  of  the  1933  rollings  and  is  the  lowest  rate  recorded  to  date. 


U 

2 

3!0 
SOU 
ISO 
ZOO 
ISO 
lOO 
«0 

\. 

\ 

\ 

s 

\ 

\ 

s 

\ 

/ 



■^ 

\ 

/ 

s 

^ 

\ 

/ 

\ 

\, 

l««              I1IO              1912                I9H 

1916               l<)l> 

1920              H22 
YEAR    ROLLED 

1924 

Ills 

mt 

ItiO 

I1H 

1«4 

Fig.  1. — Service  and  Detected  Rail  Failures  in  the  United  States  and  Canada 
(S  Years'  Service). 

Figure  1  shows  diagrammatically  the  five  year  average  from  Table  1. 

Table  2  presents  the  accumulated  failures  and  failure  rates  of  rail  from  each  of  the 
mills  for  each  of  the  roUings  of  1934  to  1937,  inclusive.  Service  plus  detected  failures 
and  failure  rates  are  shown  separately. 


TABLE  2.-  ACCUMULATED  PAILUHES  AND 

FAILURE 

RATES   mOU 

DATE  ROLLED 

ro  DEC. 

31.    1959. 

BY  MILLS, 

COMPUTED  BY 

UTI.E  YKAPS    OF  RAIL   D)  SERVICE.    ORIGINAL  TRACK  UITXS   ARE 

mCLUDED  FOR  INFORMATION  ONLY. 

SERVICE 

SERVICE  &  DETECTED 

SERVICE 

SERVICE  4  USTECTED 

yoar 

Orig'l 

Pr.lOO 

Pr.lOO 

Pr.lOO 

Orig'l 

Pr.lOO 

Pr.lOO 

Pr.lOO 

Rolled 

Trk.Mlo. 

Total 

Trk.ins. 
Pr.  YT. 

Total 

Trk.Mle 
Pr.  Yr. 

Trk.ms. 

Trk.MlB. 

Total 

Trk.Mls. 
Pr.  Yr. 

Total 

Trk.Mle. 
Pr.  Yr. 

Trk.Ula. 

ALGOUA 

nnMTNTfM 

193U 

92.25 

1*1 

e.76 

56 

11.96 

5^.60 

_ 

_ 

.. 

_ 

_ 

1955 

llj.li* 

7 

1.55 

8 

1.77 

- 

_ 

_ 

_ 

_ 

1^ 

119J*9 

19 

5J*1 

20 

5.70 

1*1.11 

0 

0.00 

0 

0.00 

1937 

121.23 

13 

5.31 

11* 

5.21 

J^.3U 

0 

0.00 

0 

0.00 

1938 

95.62 

0 

0.00 

1 

l'.Ql* 

h2.(h 

0 

0.00 

0 

0.00 

CARNEGIE 

ENSLEY 

195U 

539.76 

151* 

6.59 

177 

7.58 

'  '   ,37.85 

593.31 

122 

1*.22 

205 

7.15 

35.70 

1935 

256.97 

23 

2.21* 

llO 

3.90 

1*72.67 

59 

3.21* 

85 

1*.67 

1936 

I4U5.50 

? 

2.1*8 

1*6 

3.55 
U.87 

602.08 

56 

?.21 

88 

1937 

572.26 

1*.U7 

1*9 

690.65 

33 

2J[*0 

35 

2.51* 

1958 

167.07 

h 

2.38 

1* 

2.38 

1*80.91* 

17 

3.73 

17 

3.73 

GARY 

INIAND 

1931* 

737.67 

1*36 

12.62 

508 

IU.7I 

73.50 

262.22 

25 

2.15 

31 

2.d* 

15.25 

1^5 

i*93.i8 

157 

8.08 

1*25 

21.85 

129Ji*i* 

11 

2.32 

11 

2.32 

1936 

1196.1*9 

171* 

5.38 

387 

11.96 

1*11.7U 

26 

£.£5 

33 

1957 

1157.01 

68 

3.98 

92 

l*.l6 

383.57 
ia*.28 

16 

2.26 

18 

2.5* 

1938 

U89.87 

15 

3.23 

16 

3.U* 

1 

0.61 

1 

0.61 

IJiOKAWAmiA 

MARYT.ANT) 

193U 

327.61 

55 

3.1*2 

6s 

3.85 

19.30 

161,.12 

28 

3.71 

37 

lt.91 

2l*.6 

1935 

106.75 

16 

3.77 

20 

1*.71 

I8.3I* 

0 

0.00 

0 

0.00 

1956 

193.83 

19 

5»35 

21* 

lt.23 

37.80 

0 

0.00 

0 

0.00 

1937 

312.27 

9 

1.50 

11 

1.83 

106.95 

2 

1.19 

2 

1.19 

1^8 

13l<.67 

0 

0.00 

0 

0.00 

87.95 

2 

2.27 

2 

2.27 

MTWNEOm? 

I93I4 

361.91 

27 

1.73 

31 

1.99 

10.00 

376.76 

17 

1.13 

18 

1.19 

5.96 

1955 

271.96 

£6 

2.39 

31* 

3.11* 

135.63 

9 

1.67 

10 

1.86 

1936 

607.«6 

31 

1.95 

31 

1.95 

338.57 

7 

0.7I* 

10 

1.06 

1957 

728.31 

h 

0.30 

1* 

0.30 

37l*.10 

15 

2.23 

16 

2.38 

19?8 

59tl*2 

2 

3.39 

2 

3.39 

31*6.16 

1 

0.32 

1 

0.32 

ALL  MILLS  fExcl.AT,C 

.*   DOM. 

AI.I. 

ini.ISflnol 

ALG.4  DOM.) 

l9iU 

3363.36 

8^ 

5.66 

1069 

7.00 

35.03 

31*55.61 

905 

5.76 

1125 

7.16 

35.8 

1935 

188^.92 

301 

1*.08 

625 

8.1*7 

1998.06 

3O8 

3.91* 

633 

8.09 

32.5 

1S96 

3853.87 
1325.12 

31*5 

3.21* 

619 

5.82 

399l*J*7 
1*1*88,69 

361* 

3.29 

r. 

5.75 

18.1 

1937 
1936 

212 

2.61* 

227 

2.83 
2.3I* 

£25 

2.70 

2.89 

5.8 

1930.56 

1)2 

2.29 

{}? 

2068.82 

nllf 

2.11 

Wt 

2-2^ 

2.2 

i\>ii'l,Bi 

Ybl* 

-^583 

16(3(5^65 

Ittt 

26^ 

Figure  2  shows  diagrammatically  the  failure  rates  per  100  track  miles  of  the  1934 
and  earher  rollings  for  five  years'  service,  from  Table  2,  for  combined  service  and 
detected  failures. 


Rail 


647 


ALCenA 

I 

/ 

\ 

/ 

\ 

/ 

^~>- 

V 

^ 

S, 

/ 

\ 

/ 

\ 

' 

'V 

X 

N 

~- 

^ 

CAKMCaiC         (CARNCOieilL\MOIS) 

^ 

^ 

N 

^ 

^ 

■^ 

s 

-^ 

■^ 

\ 

— 

--- 

— 

sonrNiOM 

\ 



. 

— 

cusLtr  -  (TCKHCine.) 

/ 

-- 

\ 

,' 

^ 

S 

/ 

\ 

/ 

\ 

"^ 

— 

-^ 

'-- 

> 

-~- 

y 

\ 

g      ;oo 


a^ARY-    fCARNCG/C- ILLINOIS)     (NClUDtS  SO.WORKS  TO  1919  INCL. 

N 

X 

y 

"- 

— - 

■^ 

■~" 

-~ 

/' 

_. 

INLAND 



' 

— 



. 



rMRri.AMI>   -      f^   (BETHLEHEM) 

T 

~^ 

~ 

\ 

/ 

\ 

/ 

S, 

^ 

s, 

/ 

\ 

s. 

^ 

■^ 

_J 

•v 

^ 

s 

/ 

s 

— 

— 

-, 

MINNCQUA-    (COiOHAOO) 

n 

/ 

\ 

^ 



rr 

^ 

_ 

^ 

^ 

--- 

^ 

"v 

— 

— 

^ 

— 1 

_ 

JTEtlTOM-  (BfTMlEHEM)    ^ 

/ 

-1 

' 

~ 

S 

/ 

/ 

\ 

r-- 

^ 

V 

-~ 

s 

-~^ 

\ 

mo      mi     I9M     IV6      m>      mo     wjj     i9za     i««     ma     iiso    im     iija 

YEAR    ROLIEO 


Fig.  2. — Record  of  Failures  Per   100  Track  Miles  for  Five  Years'   Service  for 
Rollings  from  1908  to  1934  (Service  and  Detected  Failures  Included). 


648 


Rail 


YCAK 
HOLLCP 


FAILURES.  ALL  TYPE5,  PER  100  AVE.  TRACK  MILES    PER  YEAR 


MRVICE    JERVICE 


OHLY 


CARME^IE 
((buMC«ie-ii.Liiio<s) 


I9J4 
I93ff 
I93fi 
1937 
19  38 


6.6 
2.2 

2.S 

•♦.5 
2.4 


7.6 
3.9 
3.e 
■4.9 
2.4 


EN5LEY 

(TtMHCSilC) 


1934 
I93J- 
1936 
1937 
I93S 


■4.2 
3.2 


2.4 

3.7 


7.1 
4.7 

2.5- 
3.7 


QARY 
^MCGIE-IUINOK} 


1934 
t93J 
1936 
1937 
1938 


I  2.6 

8.r 
5.4 
4.0 
3.2 


14.7 
2  I  .& 
12.0 
4.2 
3.4 


INLAND 


1934 
193  5 
1936 
193  7 
1938 


2.1 
2.3 
2.2 
2.3 
0.6 


2.6 
2.3 
2. a 
2.5 
d.6 


LACKAWANNA 

(blTMlCHEM) 


1934 
I  935' 
t9J6 
1937 
1938 


3.8 
3.3 
1.5 


3.8 

-4.7 


MARTLAND 

(BCTHlEHeM) 


1934 
I93J 
1936 
1937 
1938 


0.0 
1.2 
2.3 


4.9 
0.0 
0.0 
1.2 

2.3 


MINNEQUA 

(COIOKAOO) 


1934 
I93J 
1936 
1937 
1936 


1.7 
2.4 

0.3 
3.4 


2.0 
3.k 
1.9 
0.3 
3.4 


STEELTON 
(BETHLEHCn) 


1934 
1935 
1936 
1937 
l»38 


I.I 
1.7 
0.7 
2.2 
0.3 


2.4 
0.3 


All  mills 


1934 
1935 
1936 
1937 
1938 


5.7 
4.  ( 
3.2 
2.6 
Z.3 


1.0 
6.5 
S.& 
2.8 
2.3 


LEGEND 

^    SERVICE  FAILURES 

CZI    DETECTED  FAILURES 


Fig.  3. — Failure  Rates  From  Date  Rolled  to  December  31,   1939,  by  Mills 
(Service  and  Detected  Failure  Rates  Shown  Separately). 


Figure  3  shows  diagrammatically  the  Table  2  failure  rates  per  100  track  miles  per 
year,  separately  for  service  and  service  plus  detected  failures,  for  each  of  the  1934  and 
subsequent  rollings,  by  mills,  unweighted  for  traffic. 

Figure  4  shows  diagrammatically  the  comparative  performance  of  the  various  mills 
from  data  underlying  Fig.  3,  except  that  average  traffic  density  factors  have  been  intro- 
duced in  the  final  computations,  using  the  method  described  on  pages  369-370  of  Vol. 
32,   AREA.  Proceedings   for    1931.  No   claim   is   made   for   the   entire   accuracy   of   this 


Rail 


649 


MILL 

yCAR 
KOILCD 

FAILURCS.AtL  TYPES,  PE(^  100  AVE. TRACK  MIIES  PER  YEAR  PER  UMIT  OF  TKAFF/C   DENSITV 

JtRVICE 

ONir 

SE(!ViC£ 
ANO 

5                     10                    15                   20                    25 

CARNE^\t 
^MNctiE-  ruwaii) 

l<?«-1 
l»JJ 
I13S 
1937 
1938 

1.7 
0.5 
0.6 
1  .2 
O.S 

1.9 
0.4 
0.9 
1  .3 
O.S 

m 
m 

■ 

ENJLCY 

(^TtUHtSilt) 

193^ 
I93J 
I93£ 
1937 
(936 

3.1 
3.2 
2.4 

i.a 

2.9 

5.3 

4.7 
3. a 
1.9 
2.9 

: 

■^^ 

GARY 

&AKNC6ltlUIN0lt) 

1934 
I93J" 
1936 
/937 
193a 

S.S 
3.6 
2. a 
2.0 

1  .5 

6.4 
1  0.2 
6  .  ( 
2.2 
1  .6 

] 

■■IMH 

ZD 

7 

INLAND 

1934 
1935 
I93« 
1937 
I93« 

o.a 
o.<? 

1  .0 
1  .0 
0.2 

1  .0 
0.9 
1  .1 
I.I 
0.2 

mi 

LACHAWANNK 

(llTHllHtM) 

1934 
I9jy 
1936 
(937 
I93A 

1.5 
1.5 
1  .3 
0.6 
0.0 

1.7 
1.9 
/  .7 
0.8 
0.0 

B 

MARriAND 
(kjhlchcm) 

1934 
1935 
1936 
1937 
1938 

t.6 
0.0 

0.0 
0.4 
1  .6 

Z.I 

0.0 
0.0 

0.4 
1.6 

■     1 
1 

(COIOKAOO) 

1934 
1935 
/93« 
1937 
(93a 

1  .2 
1  .5 
1  .5 
0.2 

2.9 

1.4 
2.0 
1  .5 
0.2 
4.9 

— 1 
1 

STEELTON 
(BtTHtEHErl) 

1934 
1935 
(936 
193  7 
1938 

0.5 
O.S 
O.Z 
0.6 
0.2 

0.5 
0.5 
0.4 

o.a 

0.2 

■ 
■ 

D 

ALL  MILLS 

1934 
1935 
1936 
1937 
193a 

2.5 

\  .6 
1.5 
1.2 

/ .; 

3.0 

3.7 

2.7 
1  .3 
1.  1 

P" 

LCaEND 

^   5ERVICCrAILURES 

CD    DETECTED  FAILURE5 

Fig.  4. — Failure  Rates  From  Year  Rolleti  to  December  31,  1939,  by  Mills,  Altered  by 
Traffic  Density  Factors  (Service  and  Detected  Failure  Rates  Shown  Separately). 


method  of  rating,  but  it  does  give  more  consideration  to  the  service  to  which  the  rails 
from  the  various  mills  are  subjected  than  does  the  method  of  rating  on  which  Fig.  3 
is  based. 

Table  3  shows  the  average  weights  of  rail  from  the  various  mills  and  from  all  mills 
which  are  included  in  these  statistics. 


650 


Rail 


Table  3 

Average  Weights  of  Rail  Compiled  from  Tonnages  Used  in  This  Report 

Mill  1934  1935  1936  1937  1938 

Algoma    105.2  106.6  105.0  105.5  101.2 

Dominion    100.0  100.0  100.0 

Edgar  Thomson   (Cam.)    129.0  128.5  125.7  127.5  126.1 

Ensley    (Tenn.)     106.0  106.3  107.9  108.1  107.1 

Gary    (111.)     116.1  116.2  116.8  116.1  117.5 

Inland     118.3  121.0  118.5  116.5  119.3 

Lackawanna    (Beth.)     120.6  118.9  117.6  117.0  117.6 

Maryland   (Beth.)    120.1  125.7  126.7  131.0  107.6 

Minnequa   (Colo.)    116.7  115.8  115.6  111.5  121.6 

Steelton  (Beth.)    124.3  123.1  125.0  123.5  116.7 

ALL    MILLS    118.0  116.1  116.7  116.5  114.4 


Report  on  Assignment  3  (a) 

Rail  Failure  Statistics 
Part  2 — Transverse  Fissure  Failures 


By  W.   C.  Barnes,  Engineer  of  Tests,  Rail  Committee 

These  statistics  constitute  a  cumulative  record  of  transverse  fissure  failures  that 
have  been  reported  up  to  and  including  December  31,  1939.  They  include  all  transverse 
fissured  rails  reported,  whether  located  by  actual  breakage  in  service  or  detected  before 
actual  breakage  by  inspection  or  test.  The  totals  shown,  however,  do  not  represent  all 
such  failures  that  have  occurred  for  the  reason  that  while  the  records  of  some  roads 
have  been  cumulative  for  over  20  years,  those  of  other  roads  are  of  more  recent  origin. 
Furthermore,  a  few  roads  do  not  report  such  failures  to  the  Association. 

Table  1  corresponds  with  Table  1  of  the  report  of  last  year,  and  shows  separately 
the  number  of  service  and  detected  transverse  fissured  rail  failures  which  have  been 
reported  in  all  rollings,  no  matter  how  old,  classified  by  roads  and  by  years  in  which 
the  failures  occurred.  It  includes  data  from  roads  which  are  consistently  reporting 
separately  the  service  and  detected  failures.  The  total  transverse  fissure  failures  which 
occurred  on  any  one  road  or  on  all  roads  during  any  given  year  can  be  obtained  by 
adding  the  corresponding  figures  for  service  failures  and  for  detected  failures  appearing 
in  this  table. 

Table  1  differs  from  Table  1  of  the  report  of  last  year  in  that  the  service  failures 
which  occurred  prior  to  1929,  formerly  listed  under  heading  "Prior",  have  been  omitted 
as  being  of  little  interest.  Detection  methods  were  first  used  to  any  extent  in  1929. 
Additional  explanations  will  be  found  in  foot  notes  to  the  table. 

The  total  fissure  rail  failures  reported  in  1939  compared  with  those  in  1938  are: 


Service 

1939    5,765 

1938    5,588 

Increase  in   1939    177 


Detected  Total 
13,823  19,588 
12,425       18,013 


1,398 


1,575 


3 

1.037 
866 

"i".297' 

3.898 

8.289 

858 

146 

529 

8,204 

2,412 

1,801 

1,658 

1,961 

1,058 

680 

3,151 

2 

40' 

576 

2,987 

804 

5 

258 

2,591 

995 

5 

272 

1.493 

6,828 

517 

'"""316" 

10 

4.443 

2.324 
10.660 

""264' 

•0 

Q 

CD-H      icD.-hO»-^      iO>eD  iO»0  «0  O  0<M  CO      i      i      i  OO  CO  i-t      '  CM  CM  O      . -"^  O  •-"  t--      i  ,-i      ,  t>.  i^  iO      i  Ci 
CS-^       iO«COOS       iOOOO«OOOCOO»0-^0>       t       1       n-«0«0       .^CO^       i-^-^CMCI       .^       it^CDCJ       it>. 

1                  »-<                1                                                                               II.                               .                               .                                       !                1          t-HC^       I 

CO 

oo_ 

CO 

1 

■^^       IiOI^OsO       1  t^  CO -^  OO  CD  w»».  (M  r^  CKI       !       I       ioOJ       loOOW       IlOtOt^^       I<M       I  1^  M  (N       I       I 

a>*c    I'^ocoi-H     1 1^  <N  OS  00  CO  CD  to  oi  lo         1     '     icoco    ii^c^os    t-^^mcn     no     icocdco    i     i 

y-tC^       1         00(M_^H       I         OS(M(MCO'^<M         lO              iinOi-ii         ■^              i         (NOO              i              tCDOlOii 

10 

t^o     ir^c^T—os     iio»-Ht-r~'^Tt"cDCi^-     ■     i^     tr^t-^     icsc^'— <     i-^c-ir^r*-     ico     >Oi     ico     icd 

•tr  GO       lOiOO-^       .  CO  O;  ^  kC -»*' *0  CD  CO  Tf<       1       i(N       It— CO       1  ■^  (M  O       lOOOliOCO       i  lO       i  C^       ■  OJ       i  00 
C^«       iC^CDiC.-*       1         aOCCCCCC*'i-H         -^i.              .10.-HI         CO.-Hi         C^I-^.iCO.Olt 

CO 

2 

OiOi      .^OOiaS      !ciC^iOt-(MOi      loO-^J'      I      I      locOl^      It-(MO      i      IccOOO      !-^      If-      Ir-      I      I 

tC  »0       i-^CCOSOl       1  C^  C3  lO  Qi  CO  C^       i  OO '-'       ■       '       i -^  00  t—       i  ^H  ff.)  CO       i       .  1-*  OS  Wtl       ■ -^       i  CO       i  CO       i       ■ 

i-HKMCOOS              .         CCCO^^tMi         CC'it^-^              i         CO              I.^CO              .              it-iM*_i. 

s 

K5 

s 

.-■       1       (       .OOOS-^       .lOiM^OI—  C^l-^iOTj^-^       I       1       1       ii~f^       lUS^-lCJ       1       iTjicoi--       't— CClC       11-1       1       1 

<M     1     .     ,.— icno     .--ccOicrcD'^cO'-Hcao     i     i     i     i-^t-     i-^osco     i     i<Nr^io     I'-o       in     ico     i     i 

i-H       1       1       .  CO  00  ^       '         C^Ji-KM          C-l  1-1  -H  CS       r       1       1       1  CO              •         »-•              i       ■  CO  O              '                -^T       '  CO       i       ■ 

0 

DO 

(r>. 

TJ' 

t—     1     .r-oO'*cD     .  CO '^  ^^  o> -*  CO     I'^oo     1     1  cooo5oo^HOTt«o     iTj«05oa>    i     i     lO     lO     ■  co 

t-       1       11-iOCOCO       1 '•f  GO  ■***  1— I— l>-       i-^O       1       .  1-1  •><»«<-«  Oi         ■^»-HO       it^T~l-iPCO       t       1       lOO       icO       lO 
.       .         COOOi-"       1         lO  CO  1-1  CN  1-1       ii-<i-i       1       1         ^H                              ^H^H       1                -^              II       .40       'CO       I^H 

CO 

M 
S 

eo03    lior-c^oo     Iifooococo     liococo     I     I     I     Ioo»-t     1    Icoi-i     I     1^^,-r     Ico     \-^     Ii-i     1    I 

^HCO       .-^j.^Ht— ^H       it^t— ,-no^H       i(—         t—       1       1       1       iiOCO       t       r»00       1       iOO»OI>-       iCO       it--       .CS|       i       i 
iC^-^              .0-.  «i-i              .                Will. CO              ii<M»-liiOO              I              iCO«CO<' 

CO 

2 

1     1     .oi(M-^j<r-     r     .cooo     .CO     1     1     ir—     i     i     •     >     »co     1     ic^co-*40     "COCO     1     it^cA     ir>-     i     I 

1      1      i^OOi-'O      1      .M—i      lOi      1      1      tw^      1      t      1      1      it^      1      lOOO                   iO(M      1      1        TP      tio      1      t 

.         1         .            i-«<M»-4         .         ICOM         •                  1         .         iCq j,-<-H                           l-^J*                  ,         ,            ^         ,„         ,         , 

00 

Oi 

1      1      1      1      1  1-1      ii-t  OS  t— O  OS  CO      1 -<*'      .-^      1      1      lOO      pO      1      teOO>*-f      i      .  co  i-«      (      1      11-1      lb-      1      1 

"5     i^iOco^-<r^     1          .o     1     1     It*     i(M     1     ioo»o          1     ir--^     i     i     i40     .co     i     i 

CO      I—"         cOi-i                   1             .C^ ^             1      liO             .      1      i(M      11-1      1      1 

o> 

ICO      It—      1      lOtO      icO-H      1      .      It— »OCO      1      1      1      iiO<N      iC^t-^t—      lO      lOOO      )      i      i  i-«      i      i      1      i 
ICO       11-1       1       iQOCO       it-CO       1       1       '         (M  C^I       1       1       1       ICD^H       1         OCO       icq       iCOr-l       i       i       i  CO       1       1       I       I 
.              1              ,.                     ICO              Jll                »^jjiii-.              i«              1              IC^              iii^iiii 

«5 
"5 

S 

1       t       1       .CO       1       t       lOOCKJCOcOO       't—       ilO       t       1       1       ii-lO-^       It— t—       1       lOO       iC^       ICO       1       1       i*^       1       t 
1       .       1       ikO       1       1       <  CSI  (M  .-1 -Tt<  (M       IC^       iC^       1       1       1       lOW              iC^.-t       1       1-^       I.-1       1              1       1       ICO       1       1 

0 

Oi 

3 

o 

CJlOiOC^'-'CQt-fMO;  CO'MO»-*kOCO-*J«CO'-*i-"OCOiOt-'*rOOSOOCOi-<COCOOOi-tOSCOt-COCOOCO 
<^Oi— ■cOCCC0Cl»O*Ot— OOOOCOCOCOiOi— <W5COt— 'tft— lOOO-^rCSOcDi— iCOCOcCC^i— «t— COOSOSCO 

OCO       c^  c^  CO  t- OO  c^j  t— 00  t— w  05  o:_  o  »o^                CO  co_co -^  CO  oo/v  WD  CO  OS '-9'_      -i*<_           or- OIC^I^ 

■^.-C                       C^                T-i*-.(N-^                               M                        CO                       ^iO'-'                ^C-IOO-H 

to 

lOt-       .10<MM'0  0;»0»OI—  lO^C^JCOCDO       iCO^Oi-'OOOCOOCOi-'CO— ••OcOC^t'^CIC^OcOcOOSO 

OO-Xl       .C<IOOcOt-cOi-"<*<-^Trt—  t-CO'^C-l       .                ■ft-OOOCCOCOCOCOC^IQO-'f         Oi                OSCMCOCOiO 

1         est  1-1                     »-t                           -H  C^  iO      1                     T-"                     -^                     »-(  Tf         t-1               lOCSIO 

U5 

0 

00 

coco       tOOfM-^J^OSOCOt— OOCOCOMCO»OiO       icO^(NCO»OiOOSOi  OS»OC^COCO'*-«tfCO*-*Tj<COCO'«*'CO 

■^co     nMooi-'iooi'Mooco-^ost-c^i-'i-'     i            »ot-courii-.occo*oc^^HF^       CO           Oi»o<Neoeo 

t        CO*-"                     •-"                           1-.  C^  lO      1                     »-•                     CO                     IN  U3        •-«               COCJOi        1-H 

00 

10 

i 

C^C^      ■'^•-<00»0C^C^Oi— iC0^»00sC0OC0i0c0000SOC0c0^-i00t-c00seQ00C0-<*<i-i»-iT}«c0CDO 

o>o     i»-"cocoo^cs^'^»ocvii-c^it-'^               (Nc*icot-coeo^coco»ot-      00           ooo-^cor- 

^i'*J«*-t<-"CO                rtCJ<M»0                              CS|                       CO                       MCOt-(                '*f»0'<!f 

K 

CO 

a 

COM     Ics*o■^'^ooo^-oo•«*'^oor-co»-c^»^     I(^^cooslOO»-•t*^oo^■^^-c^^(^^^'^footococo      co 

-*tO       .i-»(MC0C0i-ii-i(NC0l— COOiCO-^rcD                     iC^»OCO'*»'»OOOCOCSieOt— -^         CO                <MCDt-iM^         CI 
.eO^«-tC^               ^i-HtM**                   i<M                     CO                     i-HiOi-t               COCO^_«-iO 

»000      iQOcO  1-1 -*  OO-^  O  OS  ^  r— cO-^  Oi -^  CO      .      1 1-"  I-"  CO  00  OS  00 -^  ■*  CO  00 -^  »— CO  •«*«  ^H  O  1-1  CO  O  t- 
CO-*      .-i40C|iO»O^OCOI-OSI-I-.»-CO             .      iCOQOCOC^^wcOCOC^cO-^         CD               ocoocooo 

CO 

0 

»o 

> 

OS 

OS 

CDCO       .■^00C0^-»OC0COOlO-cD»Or—  C0»0       "Clt—  OiOO»OOC-JO;-^COOSOt— O^       lOOCMCOCOCI 

•"^CO      tC^(M^^OOOOC^J^OSOSCOCOGC-»*'I-       i                COi-«ddC-jr-»OCOCOCDcO         CD              lOCOCOCOCO 

tCOi-"                       CO                F-i,-,^c^,                       (M                       c^                       .^^^              .tMC^OS 

0 
*o 

« 

TfiOi-'l-t-eocO^-«OSOi-'»OOSCJOsOOiO      f^d-^dt-TpoOcOOt—OcDiOiOi-iiOi-iOil— t-OO"* 
CO.-1         »-«CT>O»0COC00000C*JC000t—  (M-^Ji       i                COOOi-KNiOO-^fCOiOWnJi          i-h                CDOO»-iCs|OS 

co-^                c^^^^-HOi                ^                CO                ^eoi-«           (Mr-io 

■CC 

i 

**«t-«COCOO'<rOOOOOiO^Ct^cD^      IcOCOI-OOC^-MOl'^-^f'OlOiOO^CO      Icjoio-^'^ 
OOeO         COCOOSt^-^C^CO-^OcOOOIXMGO       1                i-tClCO'^'^Ol'MiOC^lcO'^^-s              iCSCDcOC^IOi 
CO                              CO  1-1  ^  I-"  i-«  ^  1-1  <N       .                       C^                       CM                        —"CO         i-<              iCOi^iO 

i 

i 

■^OlC^MCOCS'MOSOOOSCOiOcD'.J-tO^O      I^CD(M00C^CIOc04000w-^cO00O-^-^'-«C0»0^00 
i-"C^        C-4OO-^i0i-.C000-«4<^c0I-'<*'^H      i^H        CMcDcOCOiOOCl'^'^t-CI         O               COOOOSM'^ 
»-i                       lOi-<                       CS                1-t         1-1  i-<  CO       >                       Cs|                       CO                       f-i-*!*         t-i                CO-^-f         -^ 

CO 

o 

CM<-"t^iocMOOocooo^i-«cOi-"oocooiOi    tco     'Oi»oi-'coc>joooco— ir-t-r-     icoooi-'t-t^»o 

■^CM        C0t-C000t--^000<M^01»OGOCO      i            .COOOCOC*CM-^-^CO-^COi-t        »o      t        tooo>        »o 
^H                       COi-i                       «-t  1-1         1-t         w^T~i-<T       t              >         C^                        CO                       ^Ht—                     1         '^O'^         c^ 

1 

OJ 

^-iiO'^-^05oocM»Oi-ioocM.-icoo;io»or-     "OO    iocoooO'<9'-^i-'co»oO'^coco^Hc^o»ooocMt— 

0>(M         COCDOOlOS-^iOCO^C-lCOCQt-Oi       i              .SiOCOi-icO^*Oci5o*0^»0                OOCO'-<»C 
■^^                       C4                ^.-.CM^iO       1              1         -ff                       -V                        -^»0                              kOW^ 

1 

c 

Nj  N  N  N  N  N  N  N  N 1 N  N  N  N  i  N  N  iiji  N 

!  1  2  I  !  1  I  1  1  1  Ipu  ;  1  1  1  ;  ;  1  1  ;  ;  1  ;  I'^m^'  ;  ;  i  ;  ;  i  ;2s  ;  i  ; 
c^'  \<  ;  >^a>^^  '•^Salrj'-^  ;  1  ;  ;  1  !  1  1  i^^t^Sj^  '  ■Sd-a'  .'-13' «s.  'S  1 

-<^BQpqmooot)c:>o(joQKo2H33H33sszzzzzza,(i,tf3rtw(nP^^ 

-3 

< 

S  5  g  li 

-S  J  g-.S 

c  3  rt  a» 

3    C  Q.  S 

»^  o  a  i- 


^  U  g  d 

-S7&S 

meth 
cove 
ed  to 
tated 

tion 
Data 
revis 
reins 

■Sg-S-3 

q2qQ 

652 


Rail 


Figure  1  presents  graphically  the  fissure  failures  by  year  failed  from  Table  1.  The 
solid  curve  shows  the  service  failures;  the  broken  line  shows  the  detected  failures  and 
the  dotted  Une  shows  the  service-plus-detected  failures.  It  will  be  noted  that,  despite 
the  large  number  of  fissured  rails  detected  and  removed  from  track  before  they  could 
fail  in  service,  the  number  of  service  failures  in  1Q39  is  as  great  as  it  was  in  1929  when 
detection   methods   were   first   introduced. 


22POO 

19000 
18,000 

/ 

-. 

/ 

/ 

1 
1 

1  (.000 
15,000 
140OO 
13,000 

1 
1 

1 

1 

1 

Li 

1 

/' 

/ 

/ 

/ 

1 1.000 

■/ 

1 

/ 

4' 

1 

^ 

/ 

i 

8,ooo 

/ 

/ 

//' 

y 

• 

-^^ 

/' 

0*1 

6.00O 

• 
• 
• 

^ 

•i 

,c« 

f 

\ 

^^ 

^ 

^--^ 

\ 

f 

f 

\ 

4000 

^ 

. I 

i 

y 

/ 

3000 
2,000 
fOOO 

o 

/ 

^■s^ 

1 

^ 

^ 

/ 

*^ ' 

/■ 

Fig.  1.— Total  Fissure  Failures  Reported  Each  Year  (1930  Includes  11  Months  Only). 


Table  2  shows  all  transverse  fissure  rail  failures,  including  both  service  and  detected 
failures,  reported  by  all  reporting  roads,  for  the  rollings  of  each  year  from  1929  to  1938 
inclusive,  from  each  mill,  accumulated  from  the  year  rolled  to  December  31,  1939.  These 
data  are  unweighted  for  tonnage  output  of  mills,  density  of  traffic  or  for  years  in 
service.  This  table  is  most  useful  in  comparing  the  failures  which  were  reported  in  the 
rollings  of  various  years  from  any  one  mill. 


Rail 


653 


YEAR 
ROLLED 


riSSVftE   FAILURE  RATES   PfR  100  AVE  TRACK  MILE5   PER  YEAR 


SCKVICC    SCHVICt 


CARNEGIC 
(CARMlOie-ILUtKIS) 


1430 
I9»  I 
I43t 
1933 
l»34 
I935 

1937 
I93S 


J./ 
/.6 

c.s 

0.3 
0.2 
0.1 

0.0 


i.1 
S.6 

^.B 

0.7 

I.I 
0.3 
0.1 
0.0 


ENJLEY 

(TINNOICC) 


1930 
(<»3  I 
19  32 
19  33 
(934 
193  J 
I93C 
/  937 
I  938 


t.i 

S.3 
8.0 

n.b 

0.7 

I  .s 

0.0 
0.0 

0.0 


«.7 
li.l 
3  1  .1, 

4a.» 

J. 8 
0.0 

e.o 
0.0 


GARY 

(C»HMtqiC-ILLINOI3) 


1930 
193  1 
1932 
1933 
1934 
I93S 
1936 
1937 
I  9  38 


J.O 
3.2 
O.J 

J  .0 

0.9 
O.i 


;a.f 

4.Z 


O.J  D 
0.0 


INLAND 


I9J0 

(93( 
19  32 

r93j 

193-9 
I93S 
193  0 
\13  7 
1938 


0.6 
6.1 
O.S 

0.7 
0.1 


IB. I 
J. 2 

O.i 

o.o 
a.e 
0.0 


LACKAWANNA 

(BCTXLZHtri) 


1930 
1931 
1932 
1933 
(9  34 
I93S 
(93« 
(937 
1938 


0.6 
0.6 
0.4 


4.? 
Z.S 
0.8 


'.o 


nARYLAND 
(SETMLtHEM) 


(930 
193  I 
(932 
(9  33 
1934 
P93S 
193« 
(937 
(938 


£9.i 

JS.2 

S6,« 

2.8 

I  .8 

o  .o 


niNNEQUA 
(COLOI^ADO) 


(930 
I93( 
1932 
1933 
1934 
(935 
(936 
(937 
(938 


0.2 
0.9 
O.I 
0.0 
O.I 
0.4 


/  .0 

1 .8 
0.6 
o  .o 
O.I 
O.i 
0.2  > 
e.o 
o.o 


STtCLTON 


(9JO 
(93  ( 
1932 
(933 
(934 
(933 
(936 
(937 
'938 


3-.« 
/0.3 


7.2 
O.S 


/ALL  MILL5 


(930 
(9J1 
(932 
(9  33 
(9  34 
I93J 
/93« 
(937 
(930 


I  0.9 
9.8 


LEGEND 

■i   SE(7VICC  FAILL/KES 

CD  DerccriDfMujms 


0.4 
O.I 


Fig.  2. — Fissure  Failure  Rates  From   Date  Rolled  to  December  31,   1030.  by   Mills 
(Service  and  Detected  Failures  Shown  Separately). 


654 


Rail 


YEAR 

FiaURE  FAIIURE5  Pf»  100  AVI  THACK  hllES  PER  YEAR  PER  UNIT  OF  TRAFFIC  DENSITY 

MILL 

ROLLED 

iiRvicc: 

siKvice 

OHLY 

OtTtcriB 

10                      IJ                     20                     25 

I9J0 

0.3 

1.3 

■Zl 

If3l 

OS 

I.I 

■D 

If  32 

0  a 

1  1 

■D 

CARNEGIE 

113» 

O    4 

0.4 

D 

(CMMlQItlUHUIs) 

l»3J 
1)36 
H3T 
1930 

or 
o.  o 

0.0 
0.0 

O.t 
O.  1 

0.0 

O.O 

' 

EN5LEY 

If30 
14)1 
193* 
1933 
l"»34 

1.7 
S  -3 
J. 6 
&.0 
OS 

4.5 

/  2  .( 

20.0 

3  3.4 

1  .6 

1 

1 

H 

I 1 

■"■■■ 

(TINNMSEC) 

l»35 
If  3« 
1*37 
lf3S 

1  .2 
0    0 
O.O 

o.o 

I  .9 
0.0 

o.o 

0.0 

GARY 

1731 

1433 
I9J4 
H3S 
I93< 

21 
1    s 
0.4 
O.  1 
1.2 
0.5 

7.7 
2.1 
3.4 

o.« 

43 
1  .8 

ss — 

1 

3 

^ 

■ — 1 

19  37 

O.  1 

0.3 

3 

I<I36 

0.0 

a  .0 

14  30 
l*3( 
1432 

0.3 

o.z 

1  .0 
5.2 

1    5 

□ 

CT) 

1433 

O.l 

0.6 

D 

INLAND 

1434 
I43J 
I43< 
(437 
1430 

0  o 
o.o 
o.o 
o.o 
o.o 

0.1 
0.0 
o.o 
00 

o.o 

1430 

0.3 

o.a 

E 

1431 

o.a 

1  .6 

■3 

1432 

o.z 

0.9 

□ 

LACKAWANNA 
(BcrNLfHrn) 

1433 
I4J4 
1435^ 
1436 
1437 
I43S 
1430 

o.z 
O    2 
O   6 
02 

o.o 

0.0 

S  3 

0.3 
0.3 

1  .0 
O.S 

o.o 
o.o 

22.2 

b 

D 
D 

p 

1 

MAflTLAND 

1431 
1432 
1433 
r4I-f 

-».4 
<7.4 

0.0 

o.o 

Id. 8 

2J.4 

0.6 

O.l 

■ 

.J 

3 

:d 

(trraicHErt) 

I43J 
1436 
1437 
I43fi 

O    0 
0.0 

o.o 
O.o 

o.o 

0.0 

0  .o 
o.o 

I4IO 

O.  1 

O.B 

□ 

>43( 

0.6 

1.2 

■3 

I4J2 

0.  1 

O.S 

3 

M(NNE(^UA 

^COIORAOO) 

1433 
143-4 
I43J 
I43C 
1437 
I43« 

0.0 
O.  1 
0.3 
O-  1 
O  .  0 
0.  0 

0.0 
0.2 
0-4 
0-  i 
0.0 
O.O 

i 

I430 

i.a 

5.6 

^ 

n 

1431 
1432 

3  4 
0.6 

7.1 
2.2 

■        1 

STtUTOU 

1433 
1934 

o.o 

O.  1 

0.1 

(KTHUHCn) 

I43J 
1436 
1437 
1438 

O.  1 
O.  1 

o.o 
0.2 

0.2 
O.l 
0.0 
0.2 

1 

1430 

1.9 

4.6 

MB  , 

1431 
1432 

27 
1     7 

6.  1 

4.y 

Z3 

^ _l 

ICCENO 

^  SERVICE  fAILUHfi 

ALL  MILL5 

1934 

02 

O.A 

D 

I43J 

O.S 

1    4 

■_) 

CZJPETECTED  FAILURES 

I4ia 

O.Z 

O.S 

□ 

1437 

0.0 

OI 

I43A 

o.o 

0.0 

Fig.  3. — Fissure  Failure  Rates  From  Date  Rolled  to  December  31,  1939,  by  Mills.  Altered 
by  Traffic  Density  Factors  (Service  and  Detected  Failures  Shown  Separately). 


Rai 

1 

6SS 

TABLE  NO.  2. 

-  ACCUMULATED  TRANSVERSE  FISSURE   FAILURES 

REPORTED  TO  DK.   }1. 

1939  BY  YEAR  ROLLED  AND 

BY  MILL 

(lACludea 

Sorvloa  and 

Detected  Pailures) 

year 

AlEom 

Carneg 

ie 

C 

olorado 

Dominion 

Gary 

Inland 

Itolled  Prior  1939  Total 

Prior 

1939  Total 

Prior 

1959  Total 

Prior  1939  Total 

Prior  1939  Total       Prior 

1939  Total 

1929 

86      12 

98 

687 

IJU 

821 

1U9 

67 

216 

18 

16 

31* 

1*98    11*5 

a*5 

169 

39 

208 

30 

3     17 

20 

302 

56 

358 

U9 

15 

ei* 

19 

1*6 

65 

1906    1*12 

2318 

73 

37 

110 

31 

21       16 

39 

1U7 

61 

208 

19 

21* 

U3 

0 

1 

1 

920     370 

1290 

222 

68 

310 

3Z 

39      17 

56 

75 

29 

lOl* 

9 

2 

11 

0 

0 

0 

26       1*2 

68 

6 

12 

18 

t 

0        0 

0 

38 

12 

50 

0 

0 

0 

0 

0 

0 

171*      31 

205 

9 

2 

11 

30       19 

U9 

13 

9 

22 

1 

2 

3 

0 

0 

0 

21*      U6 

70 

2 

U 

6 

55 

0         0 

0 

6 

5 

11 

U 

5 

9 

0 

0 

0 

99    178 

277 

1 

3 

It 

36 

0         0 

0 

5 

1 

U 

1 

1 

2 

0 

0 

0 

16    220 

236 

0 

1 

1 

37 

0         0 

0 

1 

0 

1 

1 

0 

1 

0 

0 

0 

2        8 

10 

0 

0 

0 

38 

0         0 

0 

0 

2 

2 

0 

0 

0 

0 

0 

0 

0        0 

0 

0 

0 

0 

39 

0         0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0         0 

0 

0 

0 

0 

Totals       179       83 

262 

1272 

309 

I58I 

233 

116 

31*9 

37 

63 

100 

3665  11*52 

5117 

U62 

166 

668 

jaokaivaimA 

Maryland 

Steelton 

Tennee 

689 

All 

UlllB 

Prior  1959  To 

tal 

Prior  1939  Total 

Prior 

1939  Total 

Prior  1939  Total 

Prior  1939  Total 

1969 

1128     3O8    11^36 

6235 

U71 

6706 

1501 

72U 

2225 

1010 

230 

121*0 

111*81  211*6  13627 

30 

56      29 

85 

957 

217 

1171* 

773 

lOli 

877 

383 

112 

1*95 

1*521  lol*5    5566 

31 

93      U* 

137 

U83 

123 

606 

6lli 

9? 

711 

662 

290 

952 

3161  1116    1(297 

32 

10         8 

18 

12U 

19 

li43 

15 

U 

19 

351 

117 

1*68 

655    250      905 

i^ 

3       0 

3 

28 

1* 

32 

0 

1 

1 

211* 

60 

271* 

1,66    110       576 

6       5 

11 

0 

12 

12 

1 

2 

3 

25 

30 

55 

102     129      231 

» 

5        5 

10 

1 

0 

1 

0 

2 

27 

25 

52 

11*3     2 

25       366 

^ 

J*         2 

6 

1 

2 

3 

1 

2 

3 

3 

0 

3 

29    229      258 

37 

0         0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

1* 

8        12 

38 

0          0 

0 

0 

0 

0 

0 

1 

1 

0 

1 

1 

0 

1*          1* 

39 

0         0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0            0 

Total 

BI305    Itoi    1706 

7829 

8(48 

8677 

2905 

937 

36(42 

2675 

865 

351*0 

20562  5260  2581*2 

Fissure  rail  failures  reported  since  1924,  as  occurring  in  the  first  year  of  service,  are 


as  follows: 


29  Failures  in  1925  from  1925    Rollings,   All   Mills 

50  "  "  1926  "  1926           "           "         " 

114  "  "  1927  "  1927 

58  "  "  1928  "  1928 

106  "  "  1929  "  1929 

33  "  "  1930  "  1930           "           "         " 

32  "  "  1931  "  1931           "           "         " 

3  "  "  1932  "  1932 

0  "  "  1933  "  1933 

0  "  "  1934  "  1934 
3  "  "  1935  "  1935 
3  "  "  1936  "  1936 

1  "  "  1937  "  1937           "           "         " 
0  "  "  1938  "  1938 

0  "  "  1939  "  1939 


Figure  2  is  a  mill  rating  chart  which  shows  separately,  for  each  mill,  the  service  and 
detected  transverse  fissure  rail  failure  rates  per  100  average  track  miles  per  year,  from 
date  of  rolling  to  December  31,  1939,  unweighted  for  traffic,  for  each  of  the  rollings  of 
1930  to  1938,  inclusive. 

Figure  3  shows  graphically  the  average  rates  of  failure,  by  mills,  from  Fig.  2, 
modified  by  the  application  of  average  traffic  density  factors,  the  derivation  of  which  is 
explained  on  pages  369-70  of  Vol.  32  of  the  AREA  Proceedings  for  1931.  Owing  to  the 
necessity  of  using  factors  obtained  from  average  trafiic  per  mile  of  road,  instead  of 
actual  traffic  over  the  particular  rails  in  question,  this  chart  can  be  considered  only  as 
an  approximation. 


656  Rail 


Report  on  Assignment  3   (b) 

Controlled-Cooled  and  Brunorized  Rail 

Compilation  of  Statistics  for   Determining  the  Performance  of   Controlled 

Cooled  and  Brunorized  Rail  in  Service  With  Respect  to  Rail  Failures, 

with  the  View  Toward  Evaluating  the  Higher  Price  Paid 

for  Treated  Than  for  Untreated  Rails 

By  W.  C.  Barnes,  Engineer  of  Tests,  Rail  Committee 

Data  are  being  accumulated  to  assist  in  determining  the  performance  in  service  of 
controUed-cooled  and  Brunorized  rail  rolled  under  contract. 

Controlled-cooled  rail  was  first  rolled  under  contract  by  the  various  mills  as  follows: 
Dominion — January,  1931;  Algoma — December,  1933;  Steelton — March,  1935;  Inland — 
April,  1935;  Lackawanna — May,  1935;  Carnegie — October,  1935;  Colorado — January, 
1936;  Ensley— February,  1936;  Gary— April,  1936. 

Brunorized  rail  was  first  rolled  under  contract  at  Gary  by  the  old  process  in  October, 
1936.  This  process  was  revised  on  April  27,  1938,  to  provide  for  holding  the  rails  at  a 
temperature  of  800-1,000  deg.  F.  for  2J/^  hours  before  charging  them  into  the  Brunorizing 
furnace. 

Table  1  lists  the  tonnages  of  all  such  contract  rail,  from  all  mills,  purchased  by  roads 
represented  on  the  Rail  committee  as  reported  to  June  30,  1940.  It  includes  a  total  of 
3,022,206  tons  of  controlled-cooled  rail  and  123,873  tons  of  Brunorized  rail,  making  a 
total  of  3,146,079  tons.  This  represents  an  increase  of  916,160  tons  of  controlled-cooled 
rail  and  30,244  tons  of  Brunorized  rail  over  the  tonnages  reported  purchased  to 
June  30,  1939. 

Table  2  lists  failures  that  have  been  reported  to  October  21,  1940,  in  the  rail  listed 
in  Table  1.  These  failures  are  classified  in  accordance  with  AREA  standards.  The  few 
transverse  and  compound  fissure  failures  in  controlled-cooled  rails  which  are  listed  have 
been  verified,  but  in  all  cases  investigation  has  shown  that  they  developed  from  inclusions 
and  not  from  the  shatter  cracks  which  the  controUed-cooling  process  is  supposed  to 
prevent.  It  will  be  noted  that  a  number  of  fissures  have  developed  in  Brunorized  rails 
which  were  rolled  prior  to  the  change  made  in  that  process  in  October,  1936.  No  fissures 
have  been  reported  in  any  Brunorized  rail  made  under  the  revised  process. 

Table  1 

Tonnage  of  Controlled-Cooled  and  Brunorized  Contract  Rail  Purchased 
TO   June   30,    1940 

Controlled 

Road  Cooled  Brunorized  Total 

AT&SF    295,119  3,571  298,690 

ACL     3,039  0  3,039 

B&O     31,043  0  31,043 

B&M    15,514  0  15,514 

CPR    178,028  0  178,028 

CNR    188,978  0  188,978 

C&NW    68,972  19,572  88,544 

C&O    176,558  0  176,558 

CB&Q    96,556  18,823  115,379 

CMStP&P     62,449  36,413  98,862 

CRI&P    109,387  0  109,387 


Rail 


657 


Controlled 

Road  Cooled 

D&H    28,974 

D&RGW     42,037 

DL&W     38,332 

ERIE    95,731 

GN     54,764 

IC    53,358 

IRT    Co 12,932 

KCS     12,956 

LV     6,835 

L&N     93,682 

MKT  0 

MP     108,489 

MeCent 6,297 

NY  Sys    196,043 

NYC&StL     44,440 

NYNH&H    46,037 

N&W     66,360 

NP     112,223 

PM     27,520 

PRR    225,238 

READING     4,837 

RF&P    8,925 

SP    235,365 

Sou  Sys    96,786 

UP      178,402 

TOTAL    TONS    3,022,206 


Brunorized 

Total 

0 

28,974 

0 

42,037 

0 

38,332 

0 

95,731 

15,934 

70,698 

5,555 

58,913 

0 

12,932 

6,186 

19,142 

0 

6,835 

0 

93,682 

204 

204 

0 

108,489 

0 

6,297 

13,117 

209,160 

0 

44,440 

0 

46,037 

0 

66,360 

0 

112,223 

0 

27,520 

0 

225,238 

0 

4,837 

0 

8,925 

0 

235,365 

0 

96,786 

4,498 

182,900 

123,873         3,146,079 


Table  2 

Failure  Data  of  Controlled-Cooled  and  Brunorized  Rail — Summary 
By  Mills — All  Rollings 

Accumulated  Failures  to  October  21,  1940 
Controlled  Cooled  Rail 

Trans.  Comp'd   Other 

Mill                                                   Fiss.     Fiss.      Head    Broken      Web  Base       Total 

Algoma     0          0            43             11  8  55           117 

Carnegie     1*         0              4              6  8  3             22 

Colorado    0          0              6               1  2  2             11 

Dominion     0          0            42              4  17  10            73 

Gary     0          0             13             14  7  16            SO 

Inland    0          0             13             39  5  13             70 

Lackawanna    0          0              5              2  2  1            10 

Steelton    2*         1*            8              5  3  1             20 

Tennessee    0          0            33            18  57  6          114 

All  Rollings,  All  Mills  3           1           167           100  109  107          487 

Brunorized  Rail 

Gary  (Old  Process)    35          4              5              5  1  4            54 

Gary   (Revised  Process)    0          0             0              0  0  0             0 

•  Developed  from  inclusions. 


658  Rail 


Report  on  Assignment  4 

Cause  and  Prevention  of  Rail  Battering  and  Methods  of 
Reconditioning  Rail   Ends 

F.  M.  Graham  (chairman,  subcommittee),  W.  C.  Barnes,  L.  H.  Bond,  N.  J.  Boughton, 
C.  B.  Bronson,  H.  A.  Cassil,  E.  E.  Chapman,  H.  R.  Clarke,  E.  J.  CuUen,  F.  W. 
Gardiner,  C.  J.  Geyer,  B.  Herman,  F.  S.  Hewes,  W.  H.  Hillis,  W.  H.  Kirkbride, 
B.  R.  Kulp,  G.  M.  Magee,  R.  W.  Marye,  Ray  McBrian,  C.  E.  Morgan,  E.  E.  Oviatt, 
J.  C.  Patterson,  Philip  Petri,  J.  C.  Ryan,  L.  H.  Schiefele,  R.  T.  Scholes,  F.  S. 
Schwinn,  G.  R.  Smiley,  A.  N.  Talbot,  J.  C.  Wallace,  Barton  Wheelwright, 
R.  P.  Winton. 

Subcommittee  6  is  continuing  to  cooperate  with  the  Rails  Investigation  at  the 
University  of  IlHnois  in  studying  the  prevention  of  end  batter  of  rails  by  suitable  heat 
treatment.  The  investigation  is  being  continued  to  observe  the  field  test  of  heat-treated 
rail  ends  on  the  Chesapeake  &  Ohio  Railway,  north  of  Carey,  Ohio,  in  the  manner 
outlined  in  Appendix  F  of  the  1940  Report  of  Committee  4 — Rail. 

The  heat-treated  rail  ends  show  generally  less  batter  than  the  comparative  untreated 
rail  ends.  The  gross  tonnage  moving  over  the  test  territory  since  the  test  was  started 
and  up  to  October,  1940,  is  about  60,000,000  tons. 

Some  of  the  heat-treated  rail  ends  are  showing  slight  evidence  of  cracks  in  a  gen- 
erally horizontal  plane  at  the  ends  of  the  rails.  These  cracks  are  about  1/16  to  %  in. 
below  the  top  of  the  rail.  None  of  them  has  broken  out.  The  cause  of  these  cracks 
is  unknown  at  present,  but  is  being  studied  by  the  Rails  Investigation.  It  is  possible  that 
these  cracks  may  in  some  manner  be  related  to  the  cross  grinding  of  these  joints. 

The  subcommittee  has  initiated  a  study  of  the  art  of  building  up  rail  ends  by 
various  methods  of  welding.  A  questionnaire  on  this  subject  has  been  submitted  to 
members  of  the  Rail  committee.  The  replies  received  have  been  summarized  and  tabulated 
and  indicate  a  very  great  diversity  in  methods  employed,  costs,  etc.  Various  weights  of 
rail  were  involved,  the  annual  gross  tonnage  over  welded  rail  was  not  generally  known, 
and  the  costs  were  apparently  not  stated  on  the  same  basis.  For  this  reason  it  seems 
desirable  to  make  a  comparative  field  test,  where  methods  as  employed  by  various  rail- 
roads can  be  carefully  observed,  the  actual  costs  of  material  and  labor  recorded,  the 
lengths  and  depths  of  added  material  measured,  and  the  kinds  of  welding  rods  and  other 
data  recorded  as  found  necessary  to  compare  the  relative  merits  of  the  methods 
employed. 

Annual  gross  tonnage  records  will  be  kept,  and  it  is  believed  that  periodical 
inspections  will  disclose  valuable  information. 

Several  railroads  have  offered  to  participate  in  this  test  by  welding  up  joints  in  the 
test  track,  using  methods  which  have  been  found  to  be  satisfactory  in  their  own  experi- 
ence. However,  some  difficulty  has  been  experienced  in  finding  a  suitable  test  site  but 
such  a  site  now  seems  available,  and  it  is  expected  to  install  the  test  about  May  1,  1941. 

It  is  hoped  to  accumulate  information  with  respect  to  reconditioning  rail  ends  by 
cropping  and  grinding. 


This  is  submitted   as  a   progress   report,   and   it  is   recommended   that   the  subject 
be  continued. 


Rail 659 

Report  on  Assignment  5 

Economic  Value  of  Different  Sizes  of  Rail 

J.  M.  Farrin  (chairman,  sub-committee),  J.  E.  Armstrong,  W.  J.  Backes,  W.  C.  Barnes. 
C.  B.  Bronson,  W.  J.  Burton,  H.  R.  Clarke,  W.  A.  Duff,  P.  O.  Ferris,  C.  J.  Geyer. 
G.  W.  Harris,  E.  M.  Hastings,  B.  Herman,  W.  H.  Hillis.  Maro  Johnson.  C.  S.  Kirk- 
patrick,  G.  M.  Magee,  R.  W.  Marye,  C.  E.  Morgan.  W.  H.  Penfield.  Philip  Petri. 
B.  H.  Prater,  A.  N.  Reece,  G.  R.  Smiley,  A.  N.  Talbot,  Barton  Wheelwright.  W.  P. 
Wiltsee,  Louis  Yager. 

Ratios  have  been  tentatively  established,  using  both  physical  and  mathematical 
rail  properties,  to  show  how  the  different  weights  of  rail  compare  when  laid  in  the  same 
location  under  identical  roadbed  conditions,  traffic  density  and  maintenance  standards 
for  the  following  items  which  make  up  the  annual  cost  of  owning  and  maintaining  the 
various  rail  sections: 

1.  Interest  on  investment 

2.  Depreciation  in  first  location 

3.  Track  laying  and  surfacing 

4.  Effect  on  life  of  ties 

5.  Effect  on  coal  consumption 

The  ratios  have  been  expressed  in  terms  of  the  152-lb.  Pennsylvania  Railroad  sec- 
tion (which  is  taken  as  unity  because  it  is  the  heaviest  rail  in  use)  and  plotted  in  graph 
form.  By  means  of  this  graph,  if  costs  are  known  for  the  above  items  for  any  size  of 
rail,  the  approximate  cost  for  any  other  size  of  rail  desired  can  be  determined  by 
proportion. 

During  the  past  year  efforts  have  been  directed  toward  checking  the  accuracy  of 
these  ratios  by  comparison  with  actual  performance,  as  is  illustrated  in  the  tabulation 
of  data  for  the  Kansas  City  Southern. 

Test  Sections  on  the  Kansas  City  Southern  Railway  for  Item  No.  3 — 
Track  Laying  and  Surfacing 

Labor  Cost  per  Mile 
19 3S  1939 

Size  of  Traffic        Kansas  Kansas 

Rail  Million  City  City 

lb.  per  Age         Track      tons  per    Southern     Farrin      Southern      Farrin 

yd.  Years        Miles        year  Report       Ratio         Report       Ratio 

85     16y2        39.88        4.750  $65  $65  $56  $56 

100     9J4         27.52         4.306  44  50  40  43 

127     754         •^8-21         4.750  34  37  42  32 

In  addition,  a  questionnaire  was  sent  to  all  members  of  the  committee  requesting 
information  as  to  their  experience  in  tonnage  life  in  the  first  location  of  the  various 
sizes  of  rail,  together  with  man-hours  of  section  labor  expended  in  track  laying  and 
surfacing.  Eighteen  replies  were  received,  and  the  information  thus  obtained  was  plotted 
and  found  to  produce  curves  approximately  parallel  with  those  shown  in  the  proposed 
plan,  thus  indicating  that  ratios  plotted  in  the  proposed  plan  are  approximately  in 
agreement. 

The  ratios  were  also  compared  with  the  annual  costs  of  100-lb.  versus  131-lb.  rail 
presented  by  the  late  Robert  Faries,  assistant  chief  engineer-maintenance.  Pennsylvania 


660 Rail 

Railroad,  in  his  testimony  before  Congressional  committee  studying  maintenance  of  way 

labor  under  the  Fair  Labor  Standards'  Act  of  1938,  the  comparison  being  as  follows 
for  track  carrying  16,500,000  tons  of  traffic  per  year: 

Faries  Farrin  Plan 

Item                                                                                        100-lb.     131-lb.  100-lb.    131-lb. 

Interest  5%    $514         $717  $514         $652 

Depreciation    561           427  561           438 

Track  laying  and  surfacing    750          601  750           548 

Ties     382           325  382           325 


This  report  is  presented  as  information  with  the  recommendation  that  the  subject 
be  continued.  • 


Report  on  Assignment  6 
Continuous  Welding  of  Rail 

Collaborating  with  Committee  5 — Track  and  Special  Committee  on 
Stresses  in  Railroad  Track 

J.  C.  Patterson  (chairman,  subcommittee),  J.  B.  Akers,  W.  C.  Barnes,  W.  J.  Burton, 
E.  J.  Cullen,  J.  M.  Farrin,  P.  O.  Ferris,  C.  J.  Geyer,  G.  W.  Harris,  E.  M.  Hastings, 
G.  M.  Magee,  C.  E.  Morgan,  E.  E.  Oviatt,  G.  A.  Phillips,  W.  H.  Penfiield,  B.  H. 
Prater,  A.  N.  Reece,  R.  T.  Scholes,  G.  R.  Smiley,  J.  C.  Wallace,  R.  W.  Marye, 
W.  P.  Wiltsee,  Louis  Yager. 

The  laboratory  investigation  of  the  continuous  welding  of  rail  is  covered  by  the 
first  and  second  progress  reports  on  this  assignment,  published  in  the  AREA  Proceedings, 
Vol.  40,  pages  687-713,  and  Vol.  41,  pages  737-755,  respectively.  The  activities  of  the 
committee  at  present  are  devoted  to  the  development  of  service  records  to  supplement 
the  findings  of  the  laboratory  tests. 

In  collaboration  with  Professor  H.  F.  Moore  and  the  Track  committee,  a  question- 
naire was  developed  to  secure  service  records.  The  answers  to  this  questionnaire  have 
been  summarized  as  shown  on  the  folded  inserts,  which  cover  the  data  on  the  original 
installations,  a  detail  of  the  failures  and  a  summary,  the  information  being  classified 
according  to  the  various  processes  of  welding,  the  process  designation  being  the  same 
as  specified  in  the  first  and  second  progress  reports. 

As  will  be  observed,  a  considerable  number  of  installations  of  welded  rail  have  had 
little  service  Hfe  to  date,  which  fact  precludes  the  formulation  of  conclusions  at  this 
period  of  the  service  investigation. 

Mr.  G.  R.  Smiley,  chief  engineer,  Louisville  &  Nashville,  makes  the  following 
comment  on  Process  "B": 

Since  our  first  attempt  in  welding  through  Vasper  tunnel  we  have  changed 
the  process  of  welding  and,  as  you  will  note,  our  experience  to  date,  particularly 
on  the  Hayden  and  Parkwood  tunnel  jobs,  has  been  very  satisfactory.  I  think  the 
manner  in  which  the  welders  are  proceeding  with  their  work  is  a  considerable 
improvement  over  our  first  experience  on  the  Vasper  Tunnel  job. 

Mr.  P.  O.  Ferris,  chief  engineer,  Delaware  &  Hudson,  states: 

In  submitting  these  statements  on  the  failures  which  we  have  experienced, 
I  should  like  to  bring  out  several  points  in  connection  with  these  failures  which 


6M 

ation.  These 


lave,  during 
rom  a  more 
:h  was  used 

ses,  namely: 
.perature. 
letter  which 
r,  21T,  and 
I,  1934,  and 
esign  of  the 
irate  control 


believe,   to 


loted  on  the 
)  welding  in 


is  type  and 
not  develop 
hese  failures 
id  placed  in 
ed  in  track, 
classification 
hose  in  the 
is  from  the 
iced  by  the 

is  the  "K" 
veld  failures 
the  welding, 

type  which 


'anizcd  iron 
ic  rail  ends, 
•anized  iron 


ng  between 
his  type  of 


J>t  ^ilon  ««ld 


9  KAXt^'^H  e«tttlr.-40>u  l*i>pth 
.■etr.tt 

f  !•  t!*?ftc  c<w-«««5  cr  twc- 

«j  or«r  •»1J»1  r»tIT 
T  Str«i*t-^-r>«  or  Vcth 

S  Jial*   .  ^  cr  di-^.  «1  *  r«f- 
•nrcr  tr  iir«ctJon  of 
tr«ITlo) 

10  LcT^rt!-.  of  rail  before 

•el41:« 
U  >*V^I  of  ml 
It  Total  ;olcta  xUed  ^oth 

9i4es  of  tpack(9egrv»*el 

tr  tjT«  of  leldl 
IS  ^e  of  »ei4 


1937 

Two-way 


14  Type   cf  trsck 


U  S-Jt  cf  »eld  In  plsce 

16  Vcft  lose  b;  rmlXraa>l, 
cootr&ctCT  or  toA 

17  £ere  :*r?  arrlied  after 
ws'iUTe  1^  aiaitlon  to 
t^  eelijns? 

IS  '^Tl^'-  s-eel  ftlloeed 
19  *ijroilr3Se  s.rr:!Bl 

Xoren^  Ir.  gross  ;cr.?- 

7««9.,    frt.   locoe. 

tkst.  ears 
2C    Carries  pas-,  cr  frt. 

triffle  or  rot: 

■Ir.  at=cajii€nc  tos^. 
J2  Trt*  of  rail  a-='or.    If 

seed,   snA  j:x.r&er  per 

rail  ler.^ 
2i  !i  KIT  jrOTlsloo  nale  fa 

expKislm  at  either  end 

of  tec-loo? 


» 


iOTf   creep 


tcs  leec  obserred  doe   to 
traffic  or  t^ij-tratire 
cs  -s^e  elcce  ras  1  was 
lellT 

Z5,  litat  s<2&s«Qaer.t  wcrk  hae 
"oeer.  &«ees»*Ji7  i»  to 
:;ree5«j'e  or  ex,'.fcrielon? 

Sf.  Vtxixrx  wr.ee  1  lOEil 

27  it»'y-9;.>:erle  teej  .  *.en 
n.11  laid  &  faaterisd 

28  Tc^«ratar«  of  rail  #ien 
laid  arfi  faetet^ed 

2f   la  tanr.e:   -.t  open 


as  ties  to  ;s'r^ 
e-  T«ck  ballast, 
e"ilO''  single  sh 
tie  plate. 


17.29 
Eailroad 


2,700,000 
Both 

o°-eo"' 

steal  -  12 


24  oak  ties  to  39'  S*  oak  ties  to  .'9* 
rail,   e"   reck  >ial-  rail,    8"   rock  bal- 
last,   P''xlO"  ^1.  last,   8"xl0"    sjl. 
ahldr.  tie  plate.  shldr.    tie  plute. 


ilO.13 
Eailroed 


2,700,000 
3oth 
00-80° 

■Jcston  -  12 


j;7.29 
Hellroad 


2,700,000 
Both 
OO-SO" 

Stead  -  12 


32,1£0  lU. 
net  weather 
70<>  to  no" 


INSTALUTIOKS  of  COMTIIiUOUS  WELDED  HAIt. 
olflo    Ril       Missouri   faoir 


lyatt.    Ark. 


to  39'  24  ties 

rock  bal-  rail,   8" 

xlO"  sgl.  tallest, 
ie  plate. 


^7.29 
Railroad 


2,700,000 
Both 
0°-80° 

Stead  -  12 


^7.29 
Bailroad 


2,700,000 
Both 
OO-80° 

Stead  -  12 


Tuimel  Tunr.el 


Drcit  northern  BB 
Z  Ml.  east  of 
Malaea,  «a*. 

1122  ft. 

Bene 
"e=.   1,    1939 

T^OMflay 
Bom 
7°30' 

Level 


32 
Oxtreld  MW  Bod. 
ait  ire  weld  nor- 
Tiallzed  by  ccn- 
trolled  ooollng 
after  conpletlon 
of  weld. 

Oo'ntression  fist- 
enin,^,  hook  bolt] 
e'VlC",  8"xl2"  ti< 
plates-wedge  ties 

ba  U  .~-st .       Tie 
pla  tes  are  double 


Central  of 
Geort'la  hailrcad 
24  Ml.   oast  of 
Blrmin^ain,   Ala. 


Central  of 
Georgia  Itailroad 
24  ki.  oust  of 
Birminrfiara,    Ala. 


Central  of 
GeOTj^ia  Itailroad 
21  a.   O'^st  of 
Binaingham,  al^. 

1283   ft. 

Aug.    1930 


90#-100J.  i.H. 
argle  bars, 7^' 
IC"  sgl.  shld; 
tie  plates, rai 
dcuble-spiked, 
7"x9"xa'  Oreo- 
so  ted  pi 
IS"   slag   ball 


ties 


90f-100;i,  S.H. 
aiVile  bars  with 
base  sheared  off, 
applied  as  straps 
7j"xll"  So-l. shldr 
tie  plates,    nU 
double- spiked, 
7"i9"x6'    creo- 
soted  ties,    19" 
slas  ballast. 

J6.76 


13,2C0,000 
30th 
1-J«.a»g.l6''-107°*  6°-76° 


Sailroed 

ilaaroad 

SailrOBd 

!S,   90#  S.  H. 
an^le   bars. 
30  K.P.H. 

Straps  applied 
30  t.P.H. 

90S  S.  H.   angle 
bars. 
30  l'..?.K. 

4,600,000 

4,600,000 

4,600,000 

Both 

Both 

Both 

60-76° 

60-76° 

6^^760 

Central  of  ".sntral  of 

Georgia  Bailroad       Geccjla  P^ilroad 
21  Mi.   east  of  '•J'i'ioj,  Oa. 


April  1937 


SOt-lOOf,  S.   H. 
angle    oars,    7fe^"x 
10"   ssl.siildr. 
tie  plates,   rail 
double-splkai, 
7"x9"xe'    oreo- 
soted  pine  ties, 
16"   slag  ballast. 


base  she-red  off,    sheared  off,  applied 
applied  as  streps, as  straps,  8"xll2" 
7;."xll"   sgl.  shldr.    6-hole  doable 


plate 

double-spiked. 

7"i9"x8"    creo- 


shldr.  tie  plates, 
rai  1  doQDle-splked 
anl  tie  plate  spiked 
to  ties,   7"i9"ie' 

12"  slag  ballast. 


Str^s  applied  Straps  applied 

30  !c.?.E.  60  k.>.H. 


4,500,000 
Both 
6°-7E° 

i'air-8 


10,740,000 
Both 
220-U60 


.^one 

Hone 

hone 

Hone 

Kcne 

kai.i.Snd  2.1" 
I.e--d  2.35- 

Hone 
36,000   lbs. 

None 
32,600  lbs. 

;ione 
32,600  lbs. 

32,600  lbs. 

Hone 
32,600  lbs. 

Hone 
32,600  lbs. 

38° 

60° 

40° 

60° 

40° 

K.Bail  780     s.Hail  8.« 

Kot  knoim 

46° 

'runnel 

40° 
Tunnel 

45° 

Tmuiol 

40° 

'i\mnel 

K.*il  78°    -.hail  60° 

Open 

Note:    welded  by 
slnirle  welders 
and  not  nonnalized 
or  slow  cooled. 


note:  welded  by 
sinj-le  welders 
atil  not    nonnallted 


OTtei    (♦:  -  f»ir  a=dhora; 
12  per  oanel  for  270  ft. 
at  each"  end.   IFsir  .nch<rs, 
12  per  panel,  ha»e  r-.<M  been 
applied  thrivfhcut  the 
enti  w  laiirth  of  »»il  «* 


661 

ation.  These 


tiave,  during 
rom  a  more 
ch  was  used 

ses,  namely: 
iperature. 
letter  which 
r,  2 IT,  and 
;,  1934,  and 
esign  of  the 
irate  control 


believe,   to 


loted  on  the 
)  welding  in 


is  type  and 
not  develop 
hese  failures 
id  placed  in 
ed  in  track, 
classification 
'hose  in  the 
is  from  the 
aced  by  the 

.  is  the  "K" 

veld  failures 

the  welding, 

type  which 


/anizcd  iron 
le  rail  ends, 
/anized  iron 


ing  between 
:his  type  of 


?roe»sg  5  -  ^i**  fusion  B'eld 


I  Sftllral 

Southern  Rai  Iway 

t  l«e«tion  of  *eld»d  9frction 

^eiandrla,   Va. 

::.F.   S.4  to  10.4 

S  fiutDua  eaiHniOus  l«nffth 

wlJcd  .Ithout  lnter»«nlii« 

Joints 

4126   ft. 

«  t»tii   lor.-th  of  aijoinlnj 

•«ldfrl  sections 

6346  ft. 

£  :tete  liiat>:ied 

iept.   1538 

6  I»  traffio  oae-«ij  or  t«o- 

•»i-  ever  welled   isil 

i^e-«ai- 

T  Stt»istt^ir»«  or  both 

Strai^t 

S  razls.s  a««r«e  of  curratiire 

None 

S  Sr&l«  (Jp  or  dora  «itli   ref- 

erence to  ii  rectlOD  of 

traf rie  1 

0.26;.  up 

IC  UKra   of  r-.il  lefore 

•elilsi 

?3' 

H  »«ie-*'t  of  rail 

lOOj 

12  Total   ;olnts  .elJed   both 

ai -es  of   traclc  Ue£i«£ated 

tT  t}^!«  of  weld. 

162 

11  >fre  if  »el4 

Oi^'-acetylene 

1*  ?jie  of  tr^.ci 

FuU   tie  pi  :;ted. 

12"  stole  ballast 

Pie  plates  are 

double  shoulder. 

IS  Cost  of  .ell  In  place 

»9.11 

15  Sea  l<»;e  bv  railrosd. 

CKtracttr  cr  both 

aailrool 

17  lere  bare  ajjlied  after 

•eUits  In  alditlai  to 

the  lelUng? 

Tea 

le  K&xlsjn  e^ead  allosd 

20  i:.?.H. 

xtrsj^e  Is  gross  tens 

z:   ^lATTleB   pass,    or  ft. 

traffic  or  rotfc 
21  A^>rox<   &rzia^  sax.   k 

win.   A^OBpherlc  tazz 
kZ  Tjpe  of  fcr.crar,    if 

used,    sx^  zrs=.heT  per 

rail  iKt^^h 
2S  l!  aty  prOTlslTi  cade 

er^&z^ioa  e-t  elt:.er  eid 

cf  eectiODf 

24  that,    if  an/^   creefAge 
h«.£   D«eE.  obserred  doe  to 
traffic   or  temperature 
cxMT^e   since   rail  w^b 
laid? 

2£  V^.at   BaxM^oent  vcaric  has 
beee:  rjecesaary    ine  to 
cree;A.?'e   cr  expansion? 

££  Kazl/=us  «ne«l    load 

27  *teo«;fm^o  tea;.  ^t£c. 
rail   laid  i.  faster^ed 

28  Titoperatsre  of  r^  1  vhen 

25  In   tJi^-*l   or   o;.er. 


for 


6,000,000 
Frelrht 

qO    _    ggO 

Fair  -  30 


31,000  lbs. 


Louisville  ^   :jush 
Jasper,   Tenn. 

ille 

H 

H 

1638   ft. 

^iay  26,    1936 

Two-way 
lOM'   on  6°   Jurre 

INJiTAUmcmii   CF  Ca.TiraOUS  'iiSUED  h..lL 


1014    ft. 


82 


Ozy-i 


etyle: 


Second    land  toeless  bars, 
24"  long}    full  tie  plated; 
copper  slag  ballast  12" 
deep)    7"x9yz8*6"  creosoted 


tie 


$9.63 


Hay  6,    l?3a 

One-way 
CuTTe 
8°02' 

Up 


Toelccs  hars; 

7"x9"ie'6"  haidwood   ties; 

Rock  lallast. 


8,000,000 

Both 

-10°    -♦BO' 

Fair  -  8 


26,260   lbs. 
SS° 


February  1939 


-  0.4,- 

39" 

lG1.49i 

117 


Cxy-acetyleTie 
7"xS"xa"6"  ere 
IJf  slac  ball  a 
Tie  plated. 


;9.6c 

liii  11  road 
Yes  -  S.H.   SOi 

70   ,,.-r.H. 

6,721,110 
Both 
10°  -   100° 


60  li.r.H. 

7,147,430 

30th 

10°  -  100° 

stead  -  6 


iprll  lu,   1539 


One-iwiy 
Straight 

One-way 

Curn 

5° 

«  0.62ii 

Down 

39- 

101 .49# 

39  • 

lOOj  12 

64 
Oxy-^i;ct.,lene  -  Butt 
7"i9"xa'6"   creosoted 
12"  8  la;;  ballast; 
Tie  plated. 

•  eld 
oak  tics; 

38 
Qxy -acetylene 
7"i9"i8'6"  oreosoted 
ties; 

12"  else  baUast; 
Tie  plated. 

»9.50 

J8.30 

Railroad 

Eailroad 

8,COO,0C0 

Both 

-10°-  •90° 

Fair  -  8 


2S,26C   lbs. 


661^ 

ation.  These 


have,  during 
rom  a  more 
ch  was  used 

ses,  namely: 
iperature. 
letter  which 
r,  2  IT,  and 
;,  1934,  and 
esign  of  the 
irate  control 


believe,   to 


loted  on  the 
)  welding  in 


is  type  and 
not  develop 
hese  failures 
id  placed  in 
ed  in  track, 
classification 
'hose  in  the 
is  from  the 
aced  by  the 

.  is  the  "K" 

veld  failures 

the  welding. 

type  which 


/anized  iron 
le  rail  ends, 
.'anized  iron 


ing  between 
;his  type  of 


INSTALLATIONS  OF  COITIliUOOE  TCLDED  RAIL 


rrcc«»   C  -  Tbenat  *eld   (Old  Typa ) 

1  SmllrMl 

t  Uv«:lcn  of  w«lJe4  section 

?  KlLXi'wi''.  cct:tln:iout    loiy-th 

5«SBener  A  Lake 
Erie  Biilr*d 
Blwr  »»11*,    P». 

Srie  Kallroxd 
OtiBvillo,   N.V. 

Nortliorn  Faol  fio 
Bfti Iway  Company 
Near  Boseman,  Mont. 

Korthem  laclflo 
Hallway  Company 
ifear  Helena,   Mont. 

Delaware  & 
Hudson  Railroad 
Albany,   H.   1. 

Uelaware  A 
Hudson  Railroad 
Keohanlosvllle,   ll.t. 

Delaware  A 
Hudson  Hailiood 
Sdienectady,   ;j,Y. 

Delaware  & 
Hudson  Railroad 
Windsor,  M.T. 

Delaware  & 

Hudson  BlailrOBd 
Comstock.   a.    I. 

Jelaware  & 
Endior.  BaUroad 
Conoea,  s,  '{, 

••lied  without   lnt«rt«nli>5 

2994   ft.    E.B. 

2517  ft,  S.B. 

:elDH 

6280  ft. 

5616  ft. 

3783   ft. 

4017  ft. 

2661   ft.   W.B. 

2619  ft.  N.B. 

e.aas  ft. 

3089  ft.   S.B. 

4054    ft.    S.B. 

591  ft.  5.B. 

lone      I.E. 

1C04  ft.  S.i. 

J'i.-.e  16i5 

4  Tot»l  Imsth  at  »djolnlns 

3740  ft.  S.B. 

••1>1  sections 

None 

None 

None 

None 

None 

None 

4,804  ft. 

2814  ft.  K.B. 

3958  ft.  K.B. 

S  ::Kte  ln>:all«d 

Oot.  4  NOT.    1956 

Juno   1936 

July  8,    1936 

au«.    3,    1936 

Aue.  1  Sept.l9?3 

Hay  1934 

June  L.  Sep. 1936 

1936 

liaj  a  June  193S 

(Is   tr»fflo  on»-»»jr  or   two- 
••f  owr  molded  rail 

Cne-wBi' 

Cne-way 

Two-way 

Two-way 

Oncjway 

One-way 

One-way 

CJenerally  two-r&j-; 
territory  is  tio- 

Orie-way 

C«e-TOy 

T  Strilfiit-Curif  cf  toth 

Both-lSCCft. straight 
5° 

Straight 

Stral^t 

Straight 

Both 

Straight 

Both 

track  widl  CTC. 
Both 

btiaijht 

Straight 

S  KfcilrJ!  decree  of  cupTsfore 

7°30' 

4° 

30 

S  2r»de   (op  or  doan  with  ref- 

•rer.c*  tc  direction  of 

1/E  -   .65Jt 

Up  o.ie)b 

tpsf  fie  i 

1.  2  -  lerel 

Do«n  O.Zli 

1.2^  or  O.Sit 

z.of. 

1.0^ 

0.5* 

0.7% 

0.3je   li.3. 

0,10!^  do«n  N.B. 

O.SSjt  !t.3.  wj 

10  Lenjth  of  r^ll  before 

•eldli^ 

S9' 

66- 

39' 

39- 

39' 

39- 

39- 

66" 

39' 

35' 

U  Teifht  of  rail 

13l#  ffi 

131i  ES 

131 j  RE 

1311!   RE 

130#  HE 

13  ]#  HE 

131^  HE 

131j  HE 

1314  RB 

1311    '^ 

11  Tctil  ;-!nt»  »eli  ed  both 

•lies  of  tnok  (segr&feted 

70  Electric  Flast 

bj-  ^JT*  cf  eold) 

269 

168 

19.1 

206 

318 

2E4 

551  Themiit 

281 

408 

74 

13  Tjpa  of  veU 

Hiend  t  fressare 

Thermit  Pressure 

Themit  Pressure 

Thermit  Pressure 

Thermit  Pressure 

Themit  Pressure 

Theirait  Presaire 

Thennit  Press\ire 

Thenrdt  Pressure 

rr.eolt  rre.-S'jre 

1«  Ibrp*  of  track 

-K)  -  Treated  red 

Treated  oak  ties 

Hardwood   ties. 

Hardwood  ties, 

Hid.  e.-rlne  clips. 

L^.L  spring  clips, 

UuL  qp  ring  clipsj 

l^&I,  5)  ling  clips. 

UAI,  spring  clips, 

ittL  spring  clips. 

oak  ties   7"xS"ie'b". 

7"l9"l8'6", 19-7/6" 

8"  ballast 

8"  ballast 

iai"x8"   louble 

13i-"l8"  double 

13t"ie"  double 

13j-"ie"  double 

13e"i8"  double 

13j"lS-  1 cubic 

22"  centers,   cinder 

ceiiter3jlO"-l^"stone 

shldr.tle  plates. 

ehldr.   tie  plates, 

shidr.  tie  plates, 

shldr.    tie  plates. 

shldr.  tie  plates. 

shldr.  tie  plates. 

sab-teUart,   12" 

ballast;    wrot  Iron 

lagged  to  tie  with 

lagged  to  tie   .ith 

lagged   to  tie  with 

Uajed  to  tie  with 

lagijed  to  tie  with 

lag:jed  to  tie  with 

Cr.   stone   nullist: 

s?l.Bhfllr.   tie 

two  screw  spikes; 

twc  screw  spikes; 

two  screw  ^ikes; 

two  screw  spikes; 

two  screw  spikes; 

tso  screw  splkea; 

6-J/4"il4-21/J2" 

plates    75"ll2J"i    3 

red  oak  treated  ties 

,     red  oak  treated  ties 

,     red  oak  treateG  ties 

,       red  OLi   treated  tie: 

3,     red  oak  treated  tie; 

»,   red  oak  treated  ties. 

tie  plates  -  4 

wrot  iron  spikes 

14"   stone  ballast 

14"   stone   baUast 

14"  stone  ball  sat 

14"   stone  baUast 

14"  stone  ballast 

14"    stone  teUast 

sere*  £^ic«s  per 

Idoulle-splked   in- 

under tHes. 

under  ties. 

under  ties. 

under  ties. 

unner  ties. 

unsar  -les.     Track 

plate. 

side  1;    2  malleable 

cOTered  with  crushed 

1£  CoFt  of  veil  In  place 

16  *3it  done  ty  r*ilrcad, 
sontrs^tw  or  toth 

17  »^e  ^3tr;  appllal  after 
«Uln«  Ic  aiiitloc  to 
fee  welling? 

1£  liftxlnr  «;«ed  allowed 
IS  A^^roxleate  &nm»l 

tonne^e  Ic  gross  toiis- 

pasa.,    frc.   losoe. 

em   a^a 
£C  C^rlei  paai,   or  frt. 

traffic  or  both 
£1  ifprcx.    sr.^.:^!  max.    li. 

Kin.  fttorsfterlc  tanf  - 
£2  ?7P€   of  rs.il  ax.c:^.e^,    If 

need,    a^t   rur.ter  per 

re::   le^frtt 
ZZ  '9  fc^  ;iCTlslon  »ele  for 

ezrsieioe:  at  either  end 

of  section? 

24  %At,    If  iz/,  creepage 
hat  fceet  obserred   iie   to 
treiflc  or  te^era^re 
A^rve   slnoe  rtkll  «&e 
1«^17 

2€  the*    t-i^eei^ierrt  eork  hae 

t*cr.   DeeeeeAiy  lae  to 

cr«e;*r»  »  ei^erJl'-ii? 

K  Mezl=-a  *r«el    loed 

27  AtcoT-ertc  t«c;>  when 

nil    lell  &  faetcrcd 

25  T«e;«btjr*  ef  rail  »^jen 
lUd   ar.l    faetercd 


ope 


Not  glTa 

Bailroal,  under  -on- 
traotor's   ffuperrlsic 

$ll'.94 

Railroad,  under 

n  tractor's   supjr 

■  Con- 

;20.4Z 
Railroad,  under 
contractor's    aupvn. 

$20.42 

Railroad,  under 
Oontr'o.    supyn. 

$19.63 
Railroad,  under  Con- 
tractor's supvn. 

J19.12 
Railroad,  under  Con- 
tractor's  supvn. 

118.11 

Ha  lira  1,   under  Con- 
tracttr's  supvn. 

J16.91 
flail  road,  under  Con- 
tractor's  supvn. 

ho 
Pass.SEKPH-FrtSaiPH 

1^0 

40  U.f .H. 

No 
25  lo.I.H. 

No 
26  i:.P.H. 

No 
2t  M.P.H. 

NO 
36  L.P.H. 

llo 
;,'o  restriction 

No 
2C  KPHIaoot. sub-soil  1 

9,000,000 

16,600,000 

7,000,000 

7,000, 'JCO 

4,160,000  N.S. 
4,266,000  S.B. 

3,000,000  U.B. 
2,aCX>,000  S.B. 

3,000,00c 

10,73i',664  ;|.B. 
6,288,241  SBI2  tks J 

Both 
-20"   to  ♦110° 

Freight 

iortals  -e'^t< 

Center  2S''to 

Falr-20  per  66' 

eicept  lat   A  lai 

rails  *ich  havi 

j'98'' 

raU, 
it    10 
!  53 

Both 
•20°  to  40° 

Fair  -  32 

Both 
•2C°   to  40° 

Fair  -  32 

Both 
Range   126° 

j:iL  Spring  Clips 

Both 
Range  126° 

MAL  spring  clips 

Freight  only 
Baige  126^ 

Mii  spring  clips 

Freight 
-20°  to  ♦96° 

IIAL  spring  clips 

J13.68 
Hailioad 


Both 
-26°  to   97° 


1-7/16" 


60°  -  80° 
Tunnel 


Note:  (•)  this  con- 
dition no  di  fferent 
tiian  before  veldlnff 


20  lIFEIlocal  on. 


ItL  spring  clips  Hil  spring  clipa 


1-5/16" 

None 

None 

None 

Trad  goes  ait 
ot  line  in  hot 
weather  due  to 
poor  sub-soil.    • 

Hone 

It  one 

None 
37,000  lbs. 

Nona 
32,000  lbs. 

None 
34,425  lbs. 

None 
54,426  . 

lbs. 

None 
34,425  lbs. 

None 
52,000  lbs. 

Sone 
54,425  lbs. 

40° 

76° 

70° 

78° 

70°  -  90° 

70°  -  9C° 

70° 

60° 
Tunnel 

No  recorl 
Open 

iio  record 
Opei. 

Open 

ord 

«0°  -  ISO" 

Open 

70°  -  130° 

Open 

70°  -  120° 
Open 

661 

ation.  These 


have,  during 
rom  a  more 
ch  was  used 

ses,  namely: 
iperature. 
letter  which 
r,  2 IT,  and 
1,  1934,  and 
esign  of  the 
irate  control 


believe,   to 


loted  on  the 
)  welding  in 


is  type  and 
not  develop 
hese  failures 
id  placed  in 
ed  in  track, 
classification 
'hose  in  the 
is  from  the 
aced  by  the 

.  is  the  "K" 

veld  failures 

the  welding. 

type  which 


/anized  iron 
le  rail  ends, 
/anized  iron 


ing  between 
ihis  type  of 


IMSTAIXATIOHS   OF   CCKTmUOUS   'ICIAED  BAIL 


Fr«»»»   C^  -  aiermlt  Weld    (Type  K) 


1  KllMMd 

t  Uoatloc  of  ««ldpd  section 

S  Kixlwr  coDtLn-^ous  length 

««1&«A  vitbCMt  lnt«rT«Rln« 

joints 
4  TctBl  len^tfa  of  adjoining 

•«:ied  ••ctioDi 
i  ^t*  iriitaUed 
£    It   trafflo   one-»»j    or  t»o- 

•»y  ore-  »«li».l   raii 
T  Strilcht-CttrT»  or  teth 
G  lUjElfj^   ce^ee   of   CKrv»tar« 
9  ^nd«   (P?  or  dofn  with  r«f- 

«T«iee  to  dlraotioc  zt 

traffic  ) 
10  Leasts  of  nil  before 

valdiag 
U   »el^.t   of  rail 
1£  Tetil  .clrti  weLled   coth 

■idea  ef  track   le^rv^ted 

13  ?7pe  of  weld 
U  type  of  track 


Ccct   of  »«ld.  In  pl60« 
Tort   irne  ^  red  iroad, 
caitr&otor  cr  ^cth 
'  *»r«  bars  applied  after 
weldir^  Ic  ftiditloa  to  tbe 
»elii::r 

^■T^r""!   B;eed   alloead 
lz;roil=^c  aimal 
tc=.=afe  Is  grtne  tcns- 
pasi*.    frt.   locea. 

;  Carries  jaae.   or  frt. 
traffic   or  ^otfa 
l^frta.   ajgg-.al  caz.   & 
«lr-.   a^q>^erle  te:^  . 

■  Tyje  of  r»ll  ^ricr.or.    If 
^^ed,    axl  mcber  par 
rail    Iv:^^ 

1   Ii  ftE7  priTi'lor  ^ie 
for  azpaneioc  at  either  end 
cf  eectlonT 

t  T^^t,    If  ar7,    er««^a.^ 
iiAe    :«e:i  cbaer  ad  *Qe   to 
traffic   cr  t^^eratore 
ci^zif^  Blr.ca  rsll  was 
is.i.'.'t 

':  ^at  ej:ae^«^rn  vcrk  haa 
b««i:  r.eccfaary  dac  to 
cre«;«.?e   or  ezva'^ioc? 

:   Maxlfa   *.ea:    load 

?  At»oBth«Tlc  t««: .  *en 
rtU    laid  *  f^ten*! 

i  ?^^rat(iT«  of  rail   #i*ii 
lai:   aad    fa«*.«ned 

t  In  t-3BLr«l  or  op«D. 


St  liorthem  R 
t  of  Sciford, 

.8. 

kont. 

Dennr  k  Skit  Lake 
l£offat  Tunnel 

By. 

The  Bsltlinore  i  Oh 
llllw  Valley,   InJ 

5,667.6    rt. 

54,066   rt. 

1366  ft. 

1957 

Uone 
July  1938 

iJone 
July  1939 

T«»-way 
3oth 

Two-way 
Both  -  600'      6   16' 
6°15' 

CuTTe 

Two-way 
Curve 
S030' 

.0.7!{  B.B. 

0*9^  deaoenlln^ 
0.3^  ascending 

0.32^  aeoendinff 

39  • 

UOl   EI 

66' 
112#   EE 

3S' 
11Z<   ES 

'3iaralt  Pressure  Type  K 
UAL  ?^stenln^, 
Creoeoted  tloa, 
12"  washed  gr^vtl  balla 


let  2 
Thermit   Preeaare  Tyj*    K 
8"xll"  cioible  ahldr.   tie  plate 
Creosoted  red  oak  ties, 
12"  porfyry  granite  anl 
volcanic  cinder  ballast 


tie  .87 

?15.U 

Eallroad  and  Co 

r.  tractor 

Contractor 

Ho 

li  H.F.B. 

Bo 

50  U.l-.H. 

6,042,000 

IJot  glien 

Both 

Both 

30°  -  100° 
^'flne 

-46°  -  'Se" 
Fair  -  10  per  66' 
6  against  ezpans] 
4  contraction. 

PrC"  1/16"  to  1-1/4" 


68 
TSiennit  Presaire  Type   K 
Jouble  sMdr.   AR£A  tie  plates 
with  2  hold-do»m  spikes,    two 
rail  ollpl   CU6;    treated  ties: 
24"  gravel  ballast. 

Uot  glren 

Bailrvad 


10,00C,000 
Both 

30°  -  eo° 
None 


The  Baltinore  i  Ohio  B.B. 
Ft,  Bitner  Tunnel,   Tunnelto 

1  rail  2146  ft. 
1  rail  J137  ft. 


0.45^  descending 
0.45i     ascending 


loe 

Thermit  pressure  Tyre   E 
Double  shldr,.  A££l  tie  plates 
with  2  hold-down   spikes,    two 
rail  clips   CU6;   treated  ties; 
24"  gravel  ballast. 

Kot  given 

Ballrosd 


10,000,000 

Both 

30°  -  60° 


76°  -  80° 

70° 
In  tunnel 


Schenectady,  i;.  Y. 


1669 

Themit  Pressire  lype  K 
lUcL  ^rinc  clipe;    13t"x8" 
double   a>ildr.   tie  plates 
lagged  with  two   screw  spikes 
to  hardwood  tics;    14"  of  stcn 
baUast  under  ties. 
$14.40 

Both 


30  UPHIdue    to    class 

9.172,800 

Frel^t 

-20°  -  -96° 

U&L  spring  dips 


Deloare  er.d 
Hudson  HailrOfld 
Uechjrlcsvllla,   D.    I. 


2519   ft.  I.B. 
i^one  *-  ff.B. 
2617  -  S.B. 
Sept.   1939  f 


0.3]b  up  t.B. 

39' 
13  If  «£ 

»63 
Thennlt  Preaeire  '^yj»   X 
M&L  spring  clips;    13}"i8" 
doucle  sfjdr.   tie  plates 
lagged  wi  ^    two  screw  spikes 
to  hardwjd  ties;    14"   of   stoa 
ballast  ' 


Iio 


3,000,000  S.B. 
2,800,000  S.B. 

Both 

-2°  -  .gs' 

Uid.  spring  clips 


70° 


■  90° 


No  reconl 
Open 
Notel    «)  -     Joints   Inetallel  in  1S59 
replaced  thoee  installed  in  1^54. 
These  19i9   joints  are  or  the  *}!»  K, 
l^lch  is  of  improved  desired. 
Believed  to  overoane  difficilty 
experienced  wih  desi^  uasd  In  1S34. 


661 

ation.  These 


have,  during 
'rom  a  more 
ch  was  used 

.ses,  namely: 
iperature. 
letter  which 
r,  2  IT,  and 
i,  1934,  and 
esign  of  the 
irate  control 


believe,   to 


loted  on  the 
)  welding  in 


lis  type  and 
not  develop 
hese  failures 
id  placed  in 
ed  in  track, 
classification 
'hose  in  the 
is  from  the 
aced  by  the 

is  the  "K" 
veld  failures 
the  welding. 

type  which 


/anized  iron 
le  rail  ends. 
/anized  iron 


ing  between 
this  type  of 


rreo»n  c  .  Iltctrlo  l>r«.mr»  Wtld 


mSTALliJICMa   OF  COMflMdouS  VLLDKD  l^,!l 


t   i*c»tlcr,  cr  wU*!  .<«ct  Ion 

«*U»1  «ll>ait  lntrr««Mnc 
.<«lnt> 

•  I»  traffic  one-«.^  or  tac- 

y  S»r«l^t-Our»»l  cr  ^oUi 

«  IUiUjk   j>«^<  of  c  jTCt  J. 

•  «r»d«   I15   or  dc»n  *th  rff- 
«T»nc«  t«  diractloi:  of 
tnffl*: 

10  Uofth  of  rail  bofor* 

11  *>l«<lt   of  r»ll 

II  fctel  Jclntt  •elded  scth 
**•  of  track  liogrogsted 
«IT  tjp«  of  wld) 

IS  rjf,  of  „u 

14   fjf   of  traA 


It  Cert   ef  w«U   Ir  jlioe 
U  »crt  dec.  ij   raUroid, 

ctttrtctcr  cr  tct. 
IT  Sore  ^re  appllod  after 

••Idlr^  In  aiditloi  to 

tio  wtliizgl 
l£  MaTlwr   sre*d  aUcvod 


19  ^prcxlmsta  «i"tf  1 
^mamet  In  gntt  toni- 
PW>.,    frt.  locoi. 
kol  oars 

M  CarrlOE  pass,  cr  frt. 
traffic   or  ^o«i 

11  A;?rcx.  atiiial  -a.  4 
■I::.   at=o-^erlo   tarp. 

il  Tjpe  tf  rail  anchor.    If 

rail  Imjfit 
25  Is   a^  jrCTislcr.  aade    fcr 

•xpenrton  at  tlthar  eal 

:f  sertloc? 
**  ^«tf    Ifary,    ore«p*^ 

^A«   te^n  otBerrad   dio  to 

traffla   or  tavparatoro 

otL&a^   Binc«  rail  «&« 

UiAl 
tt  Ifctt  lauaaqaant  work  has 

Seen  mc.e.aij  4»  to 

era«pa#t   cr  rrp«RslonT 
U  KailKA  ¥>-.«•:  loul 
2T  Itac^crlo  top.   >ben 

rd  :   laid  i  faster.«d 
ie  'sperat-jre  of  r*  1   *er.. 

Ul:  a.nd   faite.'Xd 
*f  In  tair.al  or  Dp* 


e&u  ft. 

Kono 


■Jp  C.»^ 
Doml  0.H5C 


131( 

28i  FlMhwelded 

6  Thersilt 
Ilectrlo  Flash  Weld  i 
Hierrlt   Type  K  .old 
T*-ll2t-  tl«  platesi 
treated  ties  7'i9"ie'6" 
12**  atone  tellAst. 


J13.40 
Both 


10,S6C,000 
Frel^t 
to  &0°   In  tunnel 

?atr  -  18 


Von* 
36,000  lbs. 


iviawara  i 
Hudson  Sail  road 
Sotaneotadj,  :i. 


Both 


0.7* 

39' 
13U 


UiJ*  spring  clips, 
13^"xe"  double 
sbldr.   tia  plates, 
la^ed   to   tie  with 

red  oak   treated  tie 
14"  stone  ballast 
under  tl ea. 

$9.00 

Contractor 


9,000,000 
Freight  only 
Bangs  la" 

UM.  spring  clip 


ecord 


Delaara  A 
Hudson  Railroad 
Schmeotady,   N.    Y. 


0.68%  comp.   up 


Ele 


trie  Flaah  »eld 


ii&l  spring  clips, 
l.^"xe"  double 
shldr.    tie  plates, 
laaged  to  tie  ilth 
two   screw  spikes; 
red  oak    treated  tie 
14"  stone  tallast 
under  ties. 

{13.32 
EUilroad  and 

Contractor 


SO  K.F.H.Idue  to 
class  of  englns  J 


9,178,900 

3oth 

-Z0°   tO«96° 
MAL  spring  clip 


Jcl aware  & 
Hudnon  Ballroad 
Fort  Henry,   U.   Y. 

6666  ft. 

34697     Ft. 
June-July  1937 

Two-way 
Single  Track 
Both 


1987  Ilec. Flash  »eld 
Thermit  Type  K 


CI0S1 


elds 


Iher 


mlt  Pressure  Type  K 
MAL   spring  clips, 
15E"ie"  double 
Bhldr.    tie  plates, 
lagged   to    tie  with 
two  screw  silkee: 
red  cvak  treated  ^les, 
14"  iron  ore   stone 
scre^enintis  under  ties. 
Elec.Flasl^  (12.59 

Both 


Ho 
66  MPH  So.  of  lort 

Henry 
36  MPH  No.   cf  Port 


2,817,200  K.B. 
2,536,300  3.B. 


Open 

JThese   flash  welds  were  mtjle  by 
the  General  Electric  Co.   Haila 
were  welded  In  stretches   of  3 
rails,   after  #ilch   they  were 
laid  in  tra(*  and  joined  with 
Thermit  Weld. 


See  notes 
<1  t  »2 

32,000  lbs. 


Ope 


Note  ijl;    it  locations 

aulated   Joints  oilst  a  piece  of 

einffle   rail  was  installed  what 

rail  was    laid.      This  rail  has  b 

chained  In  winter, 

longer  ral  1  and  in 

stltutlng  shorten  rall(   howeter, 

now  6-hole  Joint  bora  haTe  been 

Installed  and   this  0  Hanging  is 


in- 


tituling 


Delaware  t 
Hucfson  Kallroad 
Watcrvllet,   n.   y. 


4333  ft.  «,B. 

12289    ft.  ;i.a. 

16622   ft.  J>.B. 

1937 


30 

•   0.7£!t  up 

39' 
131( 

1622  Elec. Flash  Weld 

53  niermlt  Type  K 
Closure  welds  are  ae 
mlt  Pressure  Type  K 
Kil   ^rln?  clips 
13j"ie"  double 
shldr.   tie  plates, 
lagged  to   tie  with 

red  oak   treated   ties, 


14" 

under  ties. 

^U.33 


alls 


3,667,000  M.3. 
3,068,000  S.B. 


Both 
-20°  to    .96° 


M&L  Qonstructlon 


Delaware  & 
Hudscn  Railroad 
Bainbrkli'e,  u.   Y 


3273  ft.  ii.B. 


Clo 


elds  I 


The 


mlt  Presaire  Type  K 
MAX  eprlng  clips, 
13t"i8"  double 
shldr.    tie  plates, 
lagged  to  tie  with 
two   screw  spikes; 


|2|   One    stretch  appr 
oT  ral  1   lal  d  at   67°F 


ately 


.  at  67"F  kicked 
of  lino  on  nat  not  day.  This  rail  was 
loosened  when  temp,  was  around  90  F  and 
alloaed  to  expand,  then  reclli.ped.  No 
subsequent  difficulty  has  been  exper- 
ienced. Lee  alec  report  to  Sub-Comm.  iZ 
"Fastenings  for  Oontlnuouf  Welding  of 
Hall,"   page   668,     Vol.    40,    AREA   Bulletin. 


11,969,739 

Both 

-20°  to    .96° 

KAl  con3tructl< 


No   r 
Op  01 


Note  jilt     Closure  welds  done 
at  night  wl  th  tanperature 
around  30°  to  7u°  F.        Hall 
kicked  out  at   sme  of  these 
locations  in  next  hot  weattxr 
spring  of    1938  and   required 
roll    to  bo  cut  and   sncarter 
length  inserted.     No  sub- 
sequent difficulty  exper- 
ienced.    6ee  also  report  tf 
Sub-Comr,.    #2  on   "Fastenings 
for  Continuous  Welding  of 
Rail,"  page  668,    Vol.  40  of 
AREA  bulletin. 


3169  ft. 

22617  ft. 

1937 

Two-way 

Single  Track 

Both 

4° 


1.32^  S.B.   up 


65  Thermit  ^ype  K 
Cloaire   joints  are  E 
Pressure  Type  K 
M.lcL  ^rlng  clips, 
13g"xe"  double 
sf.ldr.  tie  plates, 
lagired   tc  tie  -vith 

red  oak  treated  tl  es 
14"  cinder  baliaat 
under  ties* 
Flslh  fll.32 

Both 


Delaware  u 
Hudson  h^ II road 
Platteburgh,  i.   Y. 


14C1  ft. 
9460  ft.  S.B. 
10681  ft.  S.B. 
Vay  1939 


11,660,409 

Both 

-20°  to    .96° 

U&L  construction 


0.3]^  up  . 

39' 

131# 


mJ.  ^  ring  clips, 
13J"i3"  double 
shldr.  tie  plates, 
lagged  to  tie  wi  th 
t™o  screw  spikes; 
red  oak  treated  ties, 
14"  iron  ore   stone 
screenings  under  ties 
$11.  a 

Both 


5,353,500 
Both 
-3CP  to  .94° 

Ud:L  (Dnstruction 


32.000  lbs. 
60°  to  78° 


Note  ,1;    Closure  welds  done 
at  night  with  temperature 
around  30°to  70°  ».     Sail 
kicked  out  at  sme  of  tie  se 
locations  in  next  hot  weather 
spring  of  1S38  aiil  required 
rai  1  to  be  cut  and  shorter 
length  inserted.     No  sub- 
sequent dli'ficulv  eiper^ 
ienced.     See  hIso    report  of 
Sub-.Cjnm.    iz  on  "Fistenlrgs 
for  Oontinuoua    *cliilng  of 
Rail,"  page   656,    Vol.  40  of 
iiREA  bulletin. 


661_ 

tation.  These 


have,  during 
From  a  more 
ch  was  used 

ises,  namely: 
iperature. 
letter  which 
T,  2  IT,  and 
5,  1934,  and 
esign  of  the 
irate  control 


believe,   to 


loted  on  the 
3  welding  in 


lis  type  and 
not  develop 
.hese  failures 
nd  placed  in 
ed  in  track, 
classification 
Those  in  the 
is  from  the 
aced  by  the 

t  is  the  "K" 
rt^eld  failures 
the  welding. 
;  type  which 


vanized  iron 
ne  rail  ends, 
vanized  iron 


ing  between 
this  type  of 


II^STivLUT  lOtJS  OF  COMTII.TJOUS   .VELUED  RnIL 


1  Railroad 

£  Location  of  w«lded  section 

3  Uaxlmum  Mntlnuous  length 
welded  without  Intflrrenln^ 
joints 

4  Total  ler^th  of  aljolnlnc 
velded   ?ectlonB 

b  Dato  Instal  led 

6  Ib  traffic  one-*aj  or  two- 
waj  OTer  aelirl  rail? 

7  Stralght-t>arT«  or  both 

e  Uaxlnw  decree  of  coTTature 
9  Grade   (Up  or  dow.  lA  th  ref- 
erence to  direction  of 
traf fl o ) 

10  Ler^h  of  rrt  1  before 
welding 

11  Weight  of  rail 

12  Tota;  ^olnts  relded  both  siJe 
of  track  leeffregated  by  type 
of  weld  ) 


13  Type  of  veld 

14  Tjrpa  of  track 


15  CoBt  of  weld  In  pl&oa 

16  Wozk  done  by  railroad, 
ecntraotor  or  both 

17  Vere  bars  applied  after 
welding  In  aldltlon  to 
the  welding? 

18  Uajlnum  speed  alloned 

19  Approrlrate   arjiual 
tonna,:^  in  grose  tens- 
pass*,    frt.   locoii. 
and  cars 

20  Carries  pass,  or   frt 
traffic  or  both 

21  A,  prox .   amma  1  meuc .  it. 
nlr. .  atcospherio  tanp* 

E2  Type   of  rail  anchor,    If 

used,    and  n>ijnber  per 

rail    lerjrth 
tZ  Ib  arv  provision  made    for 

ezpansion'ai  either  end 

c-f  section? 

24  What,    if  my,   oreepa^o 

has  beer,  obeerred  due  to 
traffio  or  temperature 
change   since  rail  was 
Ul-IT 

25  What   subsequent  work  has 
beai  necessary  due  to 
creepsgc  or  expar.tilon? 

26  Maximum  wheel  load. 

27  AtmOi5.herlo  tenp.  *  len 
rail   laid  t  fastened 

28  Tenpa-ature  of  mil  when 
laid  anl   fasteml 

29  In  tunrwl  or  op«n 


Chicago  Great  Western  Eallrtad 
Oneida,    Iowa.   1£P  £13.   _  213.99 


Two-wHy 

Both 
-  486»    long 


Jesoendlng  -  E,B. 

39' 
1121  B£ 

2&7  machine  weld 

8    field  weld 

Oxweld-Autcmatic  Pxesstire 


GEO  fastening, 
Sawed  prelored  an 
It  creosote   ties 

8"  new  washed  gra. 
24"  old  gravel. 


$9.87 

Railroad 


8,000,000 
Both 


None,   use  GEO  coTBtruction 
None  -  Aaiitlonal   rail   anchors  wt 
placed  on  rails  for  5  leng^s   at 
each   end   of  i 


elded  section. 


131 

Ozweld •Automatic  Fresai  re 

Process 

e"ill"  double  BhoulJer  tie  plates, 
spiked  two  spikes  per  plate, 

7"i9"x8'6''   treated  ties. 

9"  gravel   ballast  unler  ties, 
3"  ballast  over  ties,    upon 
which  l9  placed  a  sarfacing 
of  1-1/2"  of  limestone  chats. 

Cii.ie 

Bolh 


15  «.P.H.   -  City  Ordinance 

7,000,000 
30th 

-10°  to  ♦105'* 


1526  Stead  . 


bunciied  at   ends  of  welded  stretche 


661 

lation.  These 


have,  during 
from  a  more 
ch  was  used 

ises,  namely: 
iperature. 
letter  which 
T,  2 IT,  and 
5,  1934,  and 
lesign  of  the 
jrate  control 


believe,  to 


noted  on  the 
0  welding  in 


lis  type  and 
not  develop 
these  failures 
nd  placed  in 
ed  in  track, 
classification 
Those  in  the 
is  from  the 
aced  by  the 

t  is  the  "K" 
weld  failures 
the  welding. 
5  type  which 


vanized  iron 
he  rail  ends, 
vanized  iron 


ling  between 
this  type  of 


PAlLUaS  RE^OaTKD 


Cectral  of 


of  fail 
ur^  pre 

Location 

Installed 

Ij    re- 
ported 

E4  kl.   east  of 

£1  U.   east  of 

Blri'lnghKt,  Ala. 

Sept. 1930 
Aug.    1930 

10 

coirriMuous.  wauED  aji. 


Fail- 
ures In  weld 

this  Jate  of       Location  of         or   aw&y 

report  Fat  lire  Failure  from  «el' 


Data  not  available  for  these  failur 


Type  of  Failure 


ronnas^ 
to  date 
of  fallu 


How  Repaired 


LoJjrtUe  4 
ji&ATiUe  L.h. 


Alexar-ria,    Va.         Sept.l9S8 
"asper,   Temi.  i.iy     1936 


13-26-39 
2-  3-40 

2-27-40 


9  Vertical 
9  Angular 
6  Vertical 


No  data  reported 


No  separa- 
tion joints 
protected 
by  splices . 


Firct  failareB  reiiaired  hy 
removing  len^h  of  rail 
Including  weld  ar.d  replacine 
this  length  by  wel^ng  in 
new  piece  Trlth  position  weld, 
in  track  later,   erds  of   rail 
containing  welded  metal  v;ere 
cut      If,  closures  mtde  by 
driving  rail  aad   splices 
applied  and  joints   jonded. 


CtlSTlUe,   «.■(. 


Selene,  !;ont. 
il»r  V»ll«ry, 


July  1936 
Aut-.    1936 


11-  2-38     Tangent 

11-  5-38 

2-a;-39  " 

3-19-SS  " 

3-20-39  " 
4-22-39 

7-28-39  " 

10-19-39 

11-28-39  " 

1-18-40  " 

1-26.^0  " 

2-  1-40  " 

2-  8-40  " 

2-20-40  " 

4-14-40  " 

8-28-40  " 

&-23-40    Taajent 

2-  4-59  " 

4-  6-40 


eh 

37,041,663 

l/l6" 

39'   rail  InstaUed,  welded 

37,061,907 

1/8" 

rail  drilled  aid  angle 

40,760,000 

1/e" 

hars  applied. 

42,000,000 

3/16" 

42,041,666 

1/16" 

43,260,000 

6/32" 

46,760,000 

3/16" 

60,  751.,  000 

3/32" 

62,000,000 

1/16" 

63,870,000 

1/16" 

64,203,000 

3/16" 

64,600,000 

1/8" 

65,238,000 

1/8" 

65,320,000 

1/16" 

68,830,000 

i/;8" 

63,260,000 

3/16" 

t  hretUi 

31,000,000 

Friction  of 

1"     Temporary  b;-  tnijle   cars. 

18,000,000 

"         " 

1"     hepai  red  by  welding  in  sh 

24,000,000 

ti         tf 

1"     section  of  nil    Ithaniiiti 

1  break 

29,900,000 

0- 

Temporary  15'   piece  of  rai 

55,300,000 

I," 

out  In,  with  ant  le   bars.  . 

661 

lation.  These 


have,  during 
from  a  more 
ch  was  used 

ises,  namely: 
iperature. 
letter  which 
T,  2 IT,  and 
5,  1934,  and 
lesign  of  the 
jrate  control 


believe,   to 


rioted  on  the 
D  welding  in 


lis  type  and 
not  develop 
■.hese  failures 
rid  placed  in 
ed  in  track, 
classification 
Those  in  the 
is  from  the 
aced  by  the 

t  is  the  "K" 
iveld  failures 
the  welding, 
;  type  which 


vanized  iron 
he  rail  ends, 
vanized  iron 


ing  between 
this  type  of 


yAILUtCS  RSrOBTED 


COnTIKUUUS  a^LDU)  RAIL 


Dote 

ly 

r.I 

tills 

Date   of 

LocHtlon   of 

In  »ell 
or  away 

Tonn^e 
to   late 

Separation 
of  rails 

at   failure 

Installal 

£2. 

rtaa 

repoi- 1 

Failure 

Failure 

frci  well 

Tj-pe  of  Failure 

of   fi  lure 

How  Kepi 

iirel 

iapt.lSS 

0 

IITII 

10-27-32 

TQn,Tent 

■*cl(l  Zone 

Full    fracture  start- 

3,(.00, 000 

Ho  recoru 

Portion   of  ras 

1  containing  failed 

ing  from  oract  In 

joint  cut  out 

and  ;,lece  of  rai  1 

{2T11 

heal  of  rail. 

inserted  »ith 

angle  bars,   sigle 

12-20-33 

In   .Veil  l:etBl 

Full   fracture  appar- 

4,000,000 

1-11/16" 

bars    subseiue; 

itly  reKOved  aid 

ently   starting  frcm 

joints  welded 

by  Theiwlt  in  track. 

defect  In  Thermit 

base  coll  J. 

(3T)1 

2-  e-34 

Im  rail 

"     Sone 

Straight   square  break 
In^^.iolnt. 

5,0CO,00C 

2-1/8" 

" 

14T)1 

2-  6-34 

" 

' 

6,000,000 

1-1/4" 

.. 

|5T)1 

2-  6-31 

" 

II       II       II 

II                 "             11 

6,0C0,000 

1-3/8" 

„ 

(ST)1 

12-11-34 

Tan^-ent 

II       II       II 

Square  br?c  k  across 

6,000,000 

1-1/4" 

" 

ktffat  T^-^nel 


r**t  3crtt«m  Si    Btttfon,  Korit 


17T)1 

uerji 


0  (8T)1 

llOTH 


2-  6-35  ilch    rail 

?-  1-38  Tangent 

12-   1-38  i:i:s'i    rail 

10-28-36  Panrcnt 

12-  4-36  Low  rail 

11-Z4-36  Hl^Th    n»il 

7-2S-37  Low  rail 

11-11-37  Hlt;h    rail 


apparent  iciect. 

Pull  fractare  throng.     24,lO0, 

weld,   c.'.tu5ed   uy  poor 

weld. 

FUl    fracture  tnront'h     30,00C, 

«eld»    starting  in  head 

of  rail,    cauae  -  In- 

Bufflcieirt  head  weld. 


tins     6,000,000 


Vul} 

in  washed  aread 

head  above  Eierralt 


Head  weld  on  ZH  per 

cent   only. 

Vertical  crack  through   10,000, 

head  of   niil  and  ulom^ 

eate  of  Therrlt  collar 

in   v.«b  aiid   base. 

Fracture  through   joif.t  15,000, 

In  ".ead  and  thrt)u^ 

the  web  collar  in  weh, 

and    lB.3e,    account 

little  or  no  head  welt 

Fracture  throu^  head 

and  Th'-rmlt  collar   on 

web  and   base   from 

crack  in  head  at 

joint.    Caused  by  in- 

sufficietit  head  > 


1-1/8" 

0-1/8" 

0-3/4" 


4,500,000        2-;Vfl" 

000  Ho  record 


000  0-5/8" 


,000,000  0-3/4" 


(tittle  Kirs  applied  ■ 


Portion  of  ra  1  ccntiiining 
failed  joint  reiaoved  and 
piece  of  rai  1  inserted  witti 


Portion  of   rail  containing 
failed  joint  removed  and 
piece  of    rail  inserted  with 
angle  bars.     Bars    subsequently 
re-noved  and  joints  woii  ed  by 
Thermit  in  track. 


(16Tll 
(26TI1 

2-17-se 

10-  4-39 

U.W   T 

i:igh 

ail 
rail 

:  :  : 

Full  fracture 
throu^  weld,    caused 
hy  defective  iveld. 

25,CO0,fXJ0 
38,000,000 

0-3/4" 
1-1/2" 

ingle  bare  applied  to  joint 

1 
I 
6 

1938 
1939 
1940 

Ton^r 

nt 

In   vield 

Transverse  fisaire 

Not    reported 

0" 
0" 
0" 

By  applying  an.jle  bars 

I 

1-12-40 

Tan,-'e 

.it 

3"   from  wold 

Vertical  broak 

8,006,600 

6/8" 

Bepidred  by  welding  in  14'6" 
rail,   oxy -acetylene  butt 
weld  method. 

661 

lation.  These 


have,  during 
from  a  more 
ch  was  used 

jses,  namely: 
iperature. 
letter  which 
T,  2  IT,  and 
3,  1934,  and 
lesign  of  the 
jrate  control 


believe,   to 


noted  on  the 
0  welding  in 


lis  type  and 
not  develop 
these  failures 
nd  placed  in 
•ed  in  track, 
classification 
Those  in  the 
is  from  the 
laced  by  the 

t  is  the  "K" 
weld  failures 
the  welding, 
s  type  which 


Ivanized  iron 
he  rail  ends. 
Ivanized  iron 


ling  between 
this  type  of 


yAOUSES   RKPORTSD 


COIJTIliUOUS  W£luKD  iUll 


Location  of 


(Caitlnufrd) 
5udsan  B.   B. 


Port  heno-,  June  i  0     (12P)1 

L.    Y.  July  X937 


10-26-37     Taneent 


12-18-37     Hlrh  rail 


2-21-36      ■Mrf'.   rtdl 


l^r.l93e      Tajv^ent 


3-10-38     Hi€h  rail 


3-18-28      TtiT^sent 
10-21-37     High  rail 


12-  1-38      Low  ri'il 


12-28-38     Low  rail 


eld        Type  of  Falla 


Fall    frttcture    throng  S.OlO^COO 

weld   starting   from 

creok  in  head  at   joint 

account   insufficient 

head  weld. 

Fracture   through  her.d         4,000,000 

and   Tlitrndt    collar  on 

web  and  >:t  Be    frcn   crack 

in  het:d  at   joint,    caused 

by   insufflcluit  head   welil . 

Full    fracture   throu;^  6,000,000 

weld  at    joint-fiMparently 

imperfect    acII  in  rhen^it 


9,000,000  2-3/4  •• 


web  col la 

Square  break  1/2" 

center   of  v«ld  in  head  of 

rail  ani   separatlor   jf 

Thtrmlt  collar  frcn  web 

and  base  of  rail.   Caused 

by  Tij:nlt  collsr  not 

fusing  with  rail. 

Full    fracture  throu^        16,000,000  1-1/4" 

joint    starting  from 

eraok   In  head  due  to 

insufficient  ha.i  weld. 


of  Tead      1,000,000 


of  rail  before  weldltij. 

Full    fractire    thrcugh 
weld  starting  from   base. 
ThlB  broker,  htxze  was 
within    ilierrolt  collor 
and  q  parerttly  existed 
before  joint  was  »elded. 


rortion  of  rail  containing  failed  joint 
r».oved  and  piece  of  roil  in£,erted  wltti 
angle  b'ija.  Bars  aubaeyuentl^'  removed 
and  joints  welded  by  Themlt  in  track. 


fort  ion  of    rsi  1  containli^  fei  led 
joint  reTiOved  and  piece  of  rail 
inserted  with  angle  bars- 


i-ortion  of  rail  ccntainiag  fulled 
joint  rejnored  and  piece  of  rail 

inserted  *ith  angle  bars.      Bars 
3Ubse'Hi:".tly  removed  and  joints 
welled  b/  Tb^^nalt    in    trade. 
Portion  of  r.il   ccntainlng  failed 
joint  removed  and  piece  of    ra-il 
Ins-rted  with  angle  bars. 


6-  3-37     High    ral 1 
10-  e-37     Tangent 


zinc  in 


eld. 


Zinc  in  well   caused  by 
use  of  galvanised   iron 
shims  during  weldir^   fo: 
purpose  of  aliening  raii 
ends.      Heat   of  welding 


caused   zln 
to  vaporiB 


the 


shim 


tind  penetrate 
This  cauae  of 
rainated    by  dis 


Portion  of    rail   containing  failed 
joint  rmoved  and  piece   of  rai  1 
insertel  with  angle    bars.      Ait^le 
bars   subsequently   removed  and 
joints  welded  by  Thermit  in  track. 


661 

lation.  These 


have,  during 
from  a  more 
ch  was  used 

sses,  namely: 
iperature. 
letter  which 
T,  2  IT,  and 
J,  1934,  and 
lesign  of  the 
arate  control 


believe,   to 


noted  on  the 
0  welding  in 


lis  type  and 
not  develop 
these  failures 
nd  placed  in 
•ed  in  track, 
classification 
Those  in  the 
is  from  the 
iaced  by  the 

t  is  the  "K" 
weld  failures 
the  welding. 
s  type  which 


vanized  iron 
he  rail  ends, 
vanized  iron 


ling  between 
this  type  of 


FAIUaS  BgQBia 


coNTiirai-Ub  «ELJEij  a»iL 


10-21-37     High  rail 


1-19-S8      Loir   rail 


In  weld 
or  awaor 
from  weld          Type  of  Failure 

Tonnage 
to  date 
of  failure 

3,000,000 

Separation 
of  rails 
at  failure 

In  rail  8"       Straight  break    st»rt- 
frora  »eld         iag   from  burned  spot 
at  top  and       at  cdje  of  uottOT  of 
S"  at  bottom  base.     Darin?  welling. 

13/16" 

red 


t«a 


elUn 


aohln 


ccntuct  and  rail  base, 
causing  a  burned  ^ot 
on  the  rail   base. 
Tflb  cause  for  failure 
eliminated   i^y  proper 
welding  procedure  to 
assure  no  arcing. 

flpcd  rail  -  pipe   ax- 
tending  Into  welded 


6,000,000  6-1/2" 


tortion   of   rail   containing  fa  led 
joint  removed  and  piece  of  rsi  1 
Inserted   li  th  anrle  bars,     il^le 
bars  subsequently  removed  and 
joints  welled  by  Thermit  In  track. 


portion  of  rsi  1   contalrdng  failed 
joLit  remw  ed  and  piece  of    rail 
inserted  *1  Hi  angle  bars. 


5-  5-35     Tenrent 
5-11-39 
10-20-39  " 

1-  5-40 


21,918  3/8" 

197,260  3/8" 

3,747,944  3/8" 

6,436,614  3/8" 


Bepi  red  by  field  welds 


661 

lation.  These 


have,  during 
from  a  more 
ch  was  used 

sses,  namely: 
iperature. 
letter  which 
T,  2  IT,  and 
3,  1934,  and 
lesign  of  the 
urate  control 


[  believe,  to 


noted  on  the 
0  welding  in 


lis  type  and 
not  develop 
these  failures 
nd  placed  in 
■ed  in  track, 
classification 
Those  in  the 
is  from  the 
laced  by  the 

t  is  the  "K" 
weld  failures 
the  welding. 
s  type  which 


vanized  iron 
he  rail  ends, 
vanized  iron 


ling  between 
this  type  of 


■i^-il^T)   IliilL 


GUiJvV    .'0  .) 

.JS 

Len-th 

of 

teUai 

l.ail 

H.   S. 

Kct 

(i..P.) 

S61C 

U.F.I 

2«0S 

(i-.P.I 

z^i\ 

!..!>.  1 

Mf 

U.r.) 

105; 

(Cor  aa.  ) 

2467 

(C.of  li«.  1 

12B3 

(Cor  Oa.  1 

2565 

IC.of  Ji.) 

IK'S 

(C.of  in.) 

21  s; 

(S.  K.) 

1122 

a.  i  ;..) 

I6se 

(L.  a  ...  J 

1014 

|L.  t  !..) 

2i24 

IL.  .X  .;.) 

1092 

IL.  „  K.  ) 

747 

Iel-.«a   Joint 


112»   lu, 

i;i<  hE 


lOOi;  hL 
ltl.49, 
101.49. 

100  j  M 


..he .;!  Load 
S2,110  Ibi. 
32,1^0  lbs. 
52,11,0  lbs. 
oC.lliO  lbs. 
i2,150  lbs. 
32,500  lbs. 
3  2,  bOO  lbs. 


2,700,000  ia 

2,700,000  " 

2,700,000  " 

2,7OO,O0C  " 

2,7<<0,000  " 

4,500,C0C  " 

4,50ij,000  " 


C2,600   lb5.      10, 740, COO 
36,000  lbs.     1^,200,000 


..ot  reported  15,0i,O,0OC 

26,250    ibj.  0,OCi-,000 

2  ,250  lbs.  6,721,110 

26,250   lbs.  7,147,4."0 

26,250  lbs.  8,000,000 


Jate 

In  Tunr.el 

InstiiUta 

nr  Opa-.  ^ 

FiUures 

1937 

Puniiel 

'.one 

1936 

1938 

1936 

•1 

•t 

1939 

•1 

Sept.lS.'O 

" 

22          F 

aUj.    19: G 

10 
72 

npr.   1937 

■• 

lione 

;«ay  1936 
iiay  1536 
yeb.  1939 
Feh.  1939 
«pr.    193  9 


Rea-oved  Apr.  1937 


31,000   Ibn 


6,000,000 


Urle) 

5616 

(i.r.l 

3703 

U.i.) 

4017 

(B.6J,.S.  ) 

52S0 

(0.  i  i.  ) 

2994 

(D.  U  J..) 

2519 

(.J.  &  H.I 

11787 

(D.  i  i.) 

3089 

O.  i.B.) 

4054 

(J.   iH. 1 

551 

-el-  itinlt  (Ii-p«  .:)  (D.  iii)  24056 
13.  ^c  0.  I  1365 
(3.  a  0.  I         2145 


131, 

I&. 

131c 

Hi 

VM 

iC 

130! 

hi: 

13 1; 

ic 

i3i; 

RE 

113!  K 
llJrf  iC 
112  J  -G 


36,000  lbs.  16,600,000 
37,000  Ibt.  7,0t0,000 
37,000  lbs.       7,000,000 


37,900  lbs. 
2t,,300  l3h. 
40,000  lbs. 
40,000  lbs. 
36,900  lbs. 
33,650  Ibl 


9,000,000 
12,104,000 
3,0)0,000 
9,000,000 
6,2eb,241 
3,714,700 


33,650  lbs.       3,567,000 


16,600  lbs 
32,010  lbs 
32,000  lbs 


Wot  flcportetl 
10,000,000 
10,000,000 


40 
26 

June   l'.3i 
Jaly  1936 

26 

AO;.   1936 

;-36 

Oct.   1936 

20 

rtUe^^ept   193S 

35 

llty     1934 

Jstr 

.Junet^eit  19oi 

2'J 

1936 

76 

i.'^a  Jane  19^6 

20 

June  1936 

60 

Julj-  1936 

45 

Julj    1939 

45 

July  1939 

:.offat  lun-icl 


35,000  lb-<.        o,042,u00 


Id. 

(.  K.) 

7018 

I*>. 

a  i..| 

2519 

13. 

L  a.) 

6666 

\T>. 

«  I!. ) 

3168 

IZt. 

i.  u.) 

4333 

13. 

&  H.I 

3273 

131,  M. 
\Zli  itE 
131i  «~ 
131J    HE 


35,900  lbs. 
•34,260  Ibo. 
3S,660  lbs. 
35,900  Iba. 
33,950  lbs. 
36,900   lbs. 


9,172,800 
3, OCX), 000 
5,253,500 

11,860,409 
3,667,000 

16,969,738 


193  7 
1937 
195  7 


ID.   Il  H.  1 

11787 

ID.    U  li.l 

5961 

IK.  &  i:.| 

6666 

(i).  '.  H.  1 

4333 

(U.   iH.| 

3275 

13.  ii  H.I 

3168 

13.  <.  K.  1 

1401 

-  Caj  ?re£«ure 

(C.O.J.) 

2640 

■><U  lOxnl^l 

IC.&  I.U.  1 

9S3 

1142 
1069 

7277 


131i  BE 

i3if  w; 

ijii  i'-E 

1311  ^ 

131*  BE 

131J  f-E 

131J  i-E 

131{  "E 


36,000  lbs.      10,^60,000 


40 


Oct. 193 9 


40,000  lbs. 
36,900  lbs. 
3;, 660  lbs. 
33,550  lbs. 
36,900  lbs. 
35,300  lbs. 
33,o60  lbs. 


9,OlX),000 
9,172,800 
6,353,600 
3,667,000 
16,969,738 
11,860,409 
6,363,500 


Beatr,  June-Sept  1935 
30  1937 

65-36  Juno-July  193V 
66  19  37 

60  1937 

60  1937 

6i  V.s^    1939 


La,    1939  Open 

Jjlj   1939  " 


Rail 661 

appear  to  us  to  have  an  important  bearing  on  an  analysis  of  the  situation.  These 
are  as  follows: 

Thermit  Weld  Failures: 

The  thermit  welds  which  we  have  in  our  various  installations  have,  during 
the  period  of  years  in  which  we  have  been  welding,  been  developed  from  a  more 
or  less  experimental  type  to  the  type  known  as  the  "K"  weld,  which  was  used 
in  the  1937  and  subsequent  installations. 

The  failures  which  we  have  experienced  fall  in,  roughly,  four  classes,  namely: 

1.  Improper  design  and  lack  of  accurate  control  or  pre-heat  temperature. 
The  failures  which  are  on  the  reports  being  submitted  with  this  letter  which 

fall  in  this  category  are  failures  numbers  IT  to  IIT,  14T,  16T,  18T,  21T,  and 
2ST.  These  failures  have  all  been  in  the  installations  made  in  1933,  1934,  and 
1935  and  their  cause  has  been  eliminated  by  improvement  in  the  design  of  the 
weld  and  improvement  in  the  welding  technique,  principally  by  accurate  control 
of  the  pre-heat  temperature. 

2.  Man-failure  due  to  improper  welding  technique. 

Failure  number  22T  is  of  this  type,  the  failure  being  due,  I  believe,  to 
excessive  pre-heating  at  the  time  of  welding. 

3.  Failure  due  to  defects  in  the  rail  prior  to  welding. 

Failures  numbers  12T  and  20T  are  of  this  type,  and  it  is  to  be  noted  on  the 
report  forms  that  the  failure  was  due  to  a  crack  in  the  rail  prior  to  welding  in 
each  case,  this  crack  not  being  visible  at  the  time  of  the  welding. 

4.  Failures  due  to  use  of  improper  type  of  thermit. 

Failures  numbers  13T,  1ST,  17T,  19T,  23T  and  24T  are  of  this  type  and 
were  caused  by  the  erroneous  use  of  a  type  of  thermit  which  did  not  develop 
sufficient  heat  to  effect  a  full  head  weld  on  the  rail.  The  reports  on  these  failures 
are  being  furnished  due  to  the  fact  that  these  joints  were  welded  and  placed  in 
track  before  the  discovery  of  this  condition  and  the  failures  occurred  in  track. 

Of  the  above  types  of  failures,  those  occurring  in  the  number  1  classification 
have  been  eliminated  by  improved  design  and  welding  technique.  Those  in  the 
fourth  classification  are  automatically  eliminated,  since  their  cause  is  from  the 
erroneous  shipment  of  the  wrong  type  of  material,  which  was  replaced  by  the 
manufacturer. 

It  is  to  be  noted,  therefore,  that  in  the  last  design  of  weld,  that  is  the  "K" 
type,  there  are  only  three  failures,  two  of  which  are  not  actually  weld  failures 
but  imperfections  in  the  rail,  and  the  remaining  one,  man-failure  in  the  welding, 
which  is  a  very  small  percentage  of  the  total  number  of  welds  of  this  type  which 
we  have  in  track. 

Flash  Welds: 

The  flash  weld  failures  fall  in  three  groups: 

1.  Those  caused  by  the  presence  of  zinc  in  the  weld. 

These  are  failures  IF  and  2F  and  resulted  from  the  use  of  galvanized  iron 
shims,  used  at  the  time  of  the  welding  for  the  purpose  of  alining  the  rail  ends. 
When  the  presence  of  this  zinc  was  discovered,  the  use  of  these  galvanized  iron 
shims  was  discontinued,  eliminating  this  source  of  failure. 

2.  Failure  caused  by  burned  spot  on  edge  of  base  of  rail. 

This  burned  spot  resulted  from  arcing  during  the  time  of  welding  between 
the  rail  and  the  contact  in  the  welding  machine,  and  the  cause  of  this  type  of 


662 Rail 

failure  was  eliminated  by  the  introduction  of  proper  welding  technique  to 
eliminate  the  arcing. 

^.  Failure  due   to  imperfection  in  the  rail  prior  to  welding. 

Failure  number  4F  is  of  this  type,  and,  as  is  noted,  resulted  from  a  pipe  in 
the  rail  end  which  extended  into  the  welded  zone. 

It  is  to  be  noted,  therefore,  in  connection  with  the  flash  welded  joint  failures 
that  all  the  causes  of  failure  have  been  eliminated,  with  the  exception,  of  course, 
of  the  last  one,  and  the  possibility  of  this  type  of  failure  is  reduced  by  the  intro- 
duction of  careful  inspection  of  the  rail  ends  prior  to  welding  and  is  one  of  the 
magnitude  of  failures  in  the  rails  themselves. 

In  connection  with  Process  "E",  the  manufacturer  comments  as  follows: 

The  four  failures  which  occurred  on  the  Chicago  Great  Western  are  the  only 
ones  that  have  ever  occurred  in  any  of  the  welds  that  we  have  made  by  this 
process  and,  as  you  know,  we  have  been  welding  almost  continuously  since  we 
started  the  operation  in  1938. 

In  the  making  of  welds  by  our  process,  particularly  in  our  early  development, 
we  obtained  a  considerable  sag  at  the  outer  edge  of  the  rail  base  and  we  found 
in  our  laboratory  investigation  that  this  could  be  considerably  reduced  by  reducing 
the  upset  at  the  weld  from  a  3/^-m.  shortening  of  the  rail  to  J^-in.  This  worked 
out  very  nicely  where  the  rail  ends  were  perfectly  true  as  milled  in  the  laboratory ; 
however  when  our  laboratory  assistant  used  the  %-in.  upset  on  field  operation 
on  the  Chicago  Great  Western  job  where  the  rail  ends  could  not  be  finished  as 
accurately  as  at  the  laboratory,  the  weld  was  not  thoroughly  made  which  resulted 
in  the  failures  as  reported  by  the  Chicago  Great  Western.  We,  of  course,  imme- 
diately discontinued  any  attempt  to  make  the  weld  with  the  J^-in.  upset  and 
have  never  experienced  any  further  difficulty  from  breakage.  In  other  words,  this 
short  upset  could  not  be  relied  upon  in  all  cases  for  a  perfect  weld  but  with 
a  %-in.  upset  there  can  positively  not  be  a  weld  failure. 


This  report  is  submitted  as  information  with  the  recommendation  that  the  subject 
be  continued. 


Report  on  Assignment  7 

Service  Tests  of  Various  Types  of  Joint  Bars 

Ray  McBrian  (chairman,  subcommittee),  J.  B.  Akers,  J.  E.  Armstrong,  W.  J.  Backes, 
W.  C.  Barnes,  L.  H.  Bond,  N.  J.  Boughton,  C.  B.  Bronson,  W.  J.  Burton,  H.  A. 
Cassil,  E.  E.  Chapman,  H.  R.  Clarke,  W.  A.  Duff,  P.  O.  Ferris,  F.  W.  Gardiner. 
F.  M.  Graham,  F.  S.  Hewes,  W.  H.  Kirkbride,  C.  S.  Kirkpatrick,  B.  R.  Kulp,  G.  M. 
Magee,  R.  W.  Marye,  C.  E.  Morgan,  W.  H.  Penfield,  J.  C.  Patterson,  G.  A.  Phillips, 
B.  H.  Prater,  J.  C.  Ryan,  R.  T.  Scholes,  F.  S.  Schwinn,  A.  N.  Talbot,  J.  C.  Wallace, 
Barton  Wheelwright. 

As  previously  reported,  the  service  tests  of  various  types  of  joint  bars  are  being 
conducted  on  9  mile  stretches  of  112-lb.  rail  in  westbound  track  of  the  Illinois  division 
of  the  Atchison,  Topeka  &  Santa  Fe  Railway  west  of  Streator,  111.,  applied  in  June  1937, 
and  on  12  half-mile  stretches  of  131 -lb.  rail  in  the  eastbound  track  on  the  Fort  Wayne 
division  of  the  Pennsylvania  Railroad  east  of  Valparaiso,  Ind.,  applied  in  August  1937. 


Rail 663 

During  1940  the  periodic  observations  on  these  rail  joints  have  been  continued  by 
members  of  the  staff  of  the  Committee  on  Stresses  in  Railroad  Track.  The  principal 
observational  tests  of  these  joints,  made  in  1940,  include  (a)  Rail  surface  profile;  (b) 
joint  camber  measurements;  (c)  bolt  tension;  (d)  rail  gap;  (e)  out-to-out  distance 
of  bars. 

Rail  Surface  Profiles 

The  rail  surface  profile  measurements  (profile  of  running  surface  of  rail  for  a 
distance  of  40  in.  at  the  joint)  give  information  on  the  changes  in  rail  surface  due  to 
wear,  flow,  batter  and  bending.  The  profile  measurements  were  made  on  329  joints  on 
the  A.  T.  &  S.  F.  and  360  joints  on  the  P.  R.  R.  Included  in  those  profiles  that  were 
measured  first  in  1940  are  a  number  of  joints  in  each  mile  stretch  of  the  112-lb.  rail 
with  bolt  tensions  set  at  approximately  8,000  lb.  instead  of  the  usual  effort  of  applying 
about  15,000  lb.  for  this  rail.  As  the  measurements  at  rail  surface  are  taken  from  points 
on  the  lower  flange  of  the  rail  for  a  reference  base  or  bench,  the  changes  occurring  at 
the  top  of  rail  from  time  to  time  can  be  definitely  determined.  At  points  20  in.  from  the 
rail  ends  the  change  or  wear  in  the  last  two  years  on  the  131-lb.  rail  has  averaged  about 
0.010  in.  At  points  J4  >"■  from  rail  ends  the  changes  in  profile  on  the  131-lb.  rail  for 
the  non-hardened  ends  for  the  same  period  averaged  0.017  in.  at  the  leaving  end  and 
0.021  in.  at  the  receiving  end;  for  the  hardened  ends  the  averages  were  0.009  in.  at  the 
leaving  end  and  0.011  in.  at  the  receiving  end.  Similarly  on  the  112-lb.  rail  the  averages 
for  the  non-hardened  ends  were  0.017  in.  at  the  leaving  end  and  0.019  in.  at  the  re- 
ceiving end;  for  the  hardened  ends  the  averages  were  0.011  in.  at  the  leaving  end  and 
0.013  in.  at  the  receiving  end.  It  is  seen  that  the  change  on  the  hardened  ends  is  con- 
siderably less  than  that  on  the  non-hardened  ends.  Presumably  the  principal  part  of  the 
change  at  J/^  in.  from  the  rail  ends  was  due  to  batter. 

Joint  Camber 

The  term  joint  camber  measurement  is  used  here  as  the  middle  ordinate  at  a  point 
near  the  rail  ends  for  a  given  length  of  longitudinal  arc  of  the  surface  profile.  A  chord 
of  3434  in.  was  used  and  the  ordinates  were  measured  at  Yz  in.  from  the  rail  ends. 
If  the  arc  of  the  profile  is  convex  upward  the  measurement  is  called  positive;  if  convex 
downward,  it  is  called  negative  indicating  droop  and  batter.  Because  of  variations  in 
the  form  of  the  bar  along  its  length  in  its  manufacture,  the  joint  camber  measurement 
may  vary  considerably  from  joint  to  joint  and  from  one  stretch  of  joints  to  another. 
It  is  to  be  expected  that  the  joint  camber  measurement  will  change  in  amount  as  time 
goes  on,  due  to  wear  and  other  causes,  but  the  term  will  continue  to  be  useful,  though 
the  point  on  the  profile  for  measuring  the  middle  ordinate  in  the  future  will  have  to  be 
taken  farther  from  the  rail  end.  As  found  in  1937,  60  joints  in  each  of  the  9  stretches 
of  112-lb.  rail,  the  camber  measurement  of  two  stretches  on  the  north  rail  and  one 
stretch  on  the  south  rail  was  negative  (convex  downward).  In  1940,  9  stretches  on 
the  north  rail  (non  end-hardened)  and  only  one  on  the  south  rail  indicated  negative 
camber  measurement.  The  data  show  that  most  of  this  change  is  due  to  batter. 

On  the  131-lb.  rail  the  joint  camber  measurement  in  1937  in  2  of  the  12  stretches 
on  the  north  rail  (non  end-hardened)  was  negative  and  2  on  the  south  rail.  In  1940, 
the  number  of  stretches  showing  negative  camber  measurement  was  8  on  the  north  rail 
and  2  on  the  south  rail.  Again,  the  increase  in  the  number  of  stretches  having  negative 
camber  measurement  was  due  largely  to  batter.  The  average  values  of  the  camber 
measurement  in  1937,  1938  and  1939  for  the  various  stretches  on  two  railroads,  as 
plotted  up,  may  be  found  in  Fig.  1  and  Fig.  2,  AREA  Proceedings,  Vol.  41,  pages  660 


664 Rail 

and  661.  The  values  of  the  camber  measurement  for  1940  on  the  north  rails  (non 
hardened  ends)  have  increased  considerably  from  the  1939  measurements;  those  for  the 
south  rail  show  little  change. 

Bolt  Tension 

The  purpose  of  measuring  the  bolt  tension  is  to  find  what  tension  exists  and  to 
learn  the  effects  of  high,  medium  and  low  tension  on  the  behavior  of  the  various  types 
of  joints.  On  both  railroads  the  bolts  were  tightened  by  hand  wrenching  in  1937  soon 
after  the  track  was  laid.  A  general  tightening  was  given  in  February  1938  on  the  11 2 -lb. 
rail  and  again  in  March  1939;  also  a  general  tightening  on  the  131-lb.  rail  in  May  1939 
and  October  1940.  The  re-tightening  was  done  by  hand  except  that  of  May  1939. 
Measurement  has  been  made  of  the  tension  applied  to  the  bolts  of  a  sufficient  number 
of  joints  in  each  test  stretch  to  give  an  idea  of  the  tension  before  and  after  the  re- 
tightenings;  perhaps  the  number  measured  ranged  up  to  IS  percent  of  all  the  joints  at 
general  tightenings  and  at  other  times.  Prior  to  bolt  tightening  a  little  time  was  spent 
in  tightening,  loosening  and  re-tightening  the  bolts  in  a  few  joints  in  order  to  acquaint 
the  section  men  with  the  amount  of  steady  pull  necessary  to  produce  a  given  bolt 
tension.  A  24-in.  wrench  was  used  on  the  112-lb.  rail  and  a  42-in.  wrench  on  the  131-lb. 
rail.  The  attempt  has  been  made  to  obtain  a  general  average  tension  to  range  between 
12,000  and  15,000  lb.  at  the  time  of  tightening,  though  of  course  values  considerably 
higher  and  lower  than  these  tensions  have  been  found,  some  of  them  at  the  two  extremes. 

Some  study  has  been  made  of  the  losses  of  bolt  tension  with  time.  Only  two  broken 
bolts  have  been  reported.  It  is  beHeved  that  the  moderate  tension  used  is  largely  re- 
sponsible for  the  small  breakage,  as  on  the  companion  track  opposite  the  test  joints  on 
one  railroad  the  bolt  tension  has  been  kept  high  and  many  broken  bolts  have  been 
replaced.  The  average  movement  measured  at  the  joints  due  to  contraction  and  expan- 
sion at  temperatures  of  say  20  deg.  and  110  deg.  has  ranged  from  70  to  85  percent  of 
the  unrestricted  movement  corresponding  to  the  change  in  temperature,  and  little  or 
no  grouping  of  tight  or  open  joints  has  been  apparent.  It  should  be  noted  that  these 
gap  measurements  were  not  made  at  the  two  extremes  of  temperature.  There  is  some 
indication  that  the  36-in.  bars  restrict  the  temperature  movement  somewhat  more  than 
do  the  24-in.  bars. 

Rail  Gap 

The  measurement  of  rail  gap  (a  quick  measurement  made  at  high  and  low  tem- 
peratures) has  furnished  information  on  temperature  movement  at  joints,  which  has 
been  used  as  the  basis  for  obtaining  the  estimate  of  restraint  given  in  the  preceding 
paragraph,  and  the  lack  of  grouping  of  tight  and  open  joints.  On  both  the  112-lb.  and 
131-lb.  rail  of  the  test  joints,  the  rail  ends  generally  were  found  not  to  have  been  cut 
squarely.  When  two  ends  abut  at  the  base  at  high  temperatures,  the  gap  at  the  top  of 
the  rail  frequently  was  quite  large,  and  for  low  temperatures  extremely  large  top  gaps 
would  occur. 

Out-to-Out  Measurements 

The  out-to-out  measurement  was  made  between  a  point  on  a  flange  of  the  outer 
bar  and  a  corresponding  point  on  the  inner  bar.  The  measurement  was  taken  for  the 
upper  flange  and  also  for  the  lower  flange  at  the  two  ends  and  at  the  mid-length  of  the 
bars.  The  purpose  of  the  measurement  is  to  learn  of  any  changes  in  the  position  of  the 
bar  with  respect  to  the  rail  as  affected  by  wear  at  fishing  surfaces  or  other  changes, 
and  also  to  show  any  change  in  the  position  of  the  top  and  bottom  flanges  that  might 


Rail 665 

affect  the  verticality  or  cocking  of  the  bar.  The  variations  in  the  dimensions  of  the 
flanges  of  the  bar  as  between  the  design  and  the  manufacture  renders  precise  deter- 
mination of  the  amount  of  cocking  impracticable,  but  the  value  of  the  cocking  measured 
for  a  pair  of  bars  may  be  considered  to  be  correct  within  0.02  in.  As  the  two  bars  may 
not  have  equal  variation  from  verticality  the  magnitude  for  an  individual  bar  cannot 
be  definitely  obtained  from  the  measurements  made  between  points  on  the  flanges  of 
the  pair  of  bars.  However,  for  most  purposes  an  even  division  of  the  out-to-out  distance 
in  obtaining  a  value  of  the  cocking  or  departure  from  verticality  will  result  in  a  useful 
and  generally  fairly  accurate  measure  of  the  cocking  of  one  bar. 

The  change  in  out-to-out  distance  from  1937  to  1940  has  been  small.  The  move- 
ment usually  takes  place  rather  uniformly  along  the  length  from  end  to  end,  though 
occasionally  one  end  differs  from  the  other  and  there  may  be  twisting  in  the  bar.  The 
average  decrease  in  out-to-out  distance  at  mid-length  of  bars  for  180  joints  in  9 
stretches  of  the  112-lb.  rail  was  0.05  in.  for  the  top  flange  measurement  and  0.03  in.  for 
the  bottom  flange  measurement  (averaging  0.025  and  0.015  in.  pull-in  for  an  individual 
bar),  and  for  100  joints  in  5  stretches  of  the  131-lb.  rail  it  was  0.04  in.  for  the  top 
flange  measurement  and  0.02  in.  for  the  bottom  flange  measurement  (averaging  0.02 
and  0.01  in.  pull-in  for  an  individual  bar).  Data  for  7  stretches  of  131-lb.  rail  contain 
some  uncertainties  and  are  not  included  here.  The  above  figures  show  that  for  the  14 
stretches  the  change  in  out-to-out  distance  at  the  top  flange  averaged  0.01  in.  more 
than  that  at  the  bottom  flange.  It  is  apparent  that  the  change  in  verticahty  of  a  bar 
(increase  in  cocking)  has  been  small.  The  measurements  indicate  that  moderate  cocking 
of  the  bars  on  these  stretches  is  not  uncommon.  Considering  that  the  departure  from 
verticality  is  the  same  in  the  two  bars  of  a  pair  and  using  the  averages  for  each  stretch, 
the  average  cocking  of  an  individual  bar  for  the  112-lb.  rail  is  0.06  in.  and  the  range 
is  0  to  0.12  in.  Likewise  for  the  131-lb.  rail  the  average  is  0.04  in.  and  the  range  from 
0.03  in.  to  0.06  in. 

Among  other  observations,  longitudinal  profiles  of  bar  fishing  surfaces  (top  and 
bottom)  were  made  on  a  number  of  bars  removed  from  track  to  determine  to  what 
extent  wear  had  occurred.  Generally  so  far  this  wear  amounts  to  only  a  few  thousandths 
of  an  inch  and  this  only  for  short  distances  near  the  rail  ends.  For  these  bars  diagrams 
were  drawn  giving  information  on  the  dimensions  and  location  of  the  bearing  areas 
observed  on  the  top  and  bottom  fishing  surfaces. 

The  measurements  and  observations  made  to  date  throw  light  on  the  action  of  the 
joints  in  various  ways,  such  as  changes  in  the  amount  of  cocking  with  time,  effect  of 
camber  of  bar,  place  of  wear  in  modern  bars,  rate  of  wear  with  traffic,  and  effect  of 
end  hardening  on  batter.  They  give  a  basis  for  judgment  when,  with  continued  traffic, 
wear  may  begin  to  increase  more  rapidly  with  some  types  and  result  in  marked  differences 
in  durability  and  effectiveness. 

In  round  numbers  the  amount  of  gross  traffic  (including  locomotives),  as  reported 
by  the  railroads,  averaged  10,000,000  tons  per  year  on  the  112-lb.  rail  or  30,000,000  tons 
for  the  three  years  covered  by  this  report,  and  averaged  12,000,000  tons  per  year  on  the 
131-lb.  rail  or  36,000,000  tons  for  the  three  years  of  service. 

On  the  question  of  comparison  of  types  of  bar  it  may  be  said  that,  except  for  one 
design  of  bar,  the  amount  of  wear  and  other  changes  in  the  bars  installed  have  not  yet 
been  sufficient  to  determine  definitely  the  relative  values  of  the  different  types  of 
joint  bars. 


The  report  is  presented  as  information  with  the  recommendation  that  the  subject 
be  continued. 


666 


Rail 


Report  on  Assignment  8 

Investigate  Joint  Bar  Failures  and  Give  Consideration  to  the 
Revision  of  Design  and  Specifications 

Ray  McBrian  (chairman,  subcommittee),  J.  B.  Akers,  J.  E.  Armstrong,  W.  J.  Backes, 
W.  C.  Barnes,  L.  H.  Bond,  N.  J.  Boughton,  C.  B.  Bronson,  W.  J.  Burton,  H.  A. 
Cassil,  E.  E.  Chapman,  H.  R.  Clarke,  W.  A.  Duff,  P.  O.  Ferris,  F.  W.  Gardiner, 
F.  M.  Graham,  F.  S.  Hewes,  W.  H.  Kirkbride,  C.  S.  Kirkpatrick,  B.  R.  Kulp,  G.  M. 
Magee,  R.  W.  Marye,  C.  E.  Morgan,  W.  H.  Penfield,  J.  C.  Patterson,  G.  A.  Phillips, 
B.  H.  Prater,  J.  C.  Ryan,  R.  T.  Scholes,  F.  S.  Schwinn,  A.  N.  Talbot,  J.  C.  Wallace, 
Barton  Wheelwright. 

The  committee  interprets  the  assignment  to  investigate  joint  bar  failures  to  include 
the  study  of  cracks  which  may  or  may  not  lead  to  ultimate  breakage. 

The  previous  report  on  this  subject  included  information  obtained  by  a  question- 
naire relative  to  the  number  of  joint  bar  failures,  theories  as  to  cause,  and  suggested 
measures  to  eliminate  any  cracking.  Also  mentioned  was  research  and  experimental  work 
being  made  by  various  roads.  The  committee  also  reported  that,  at  present,  based  on 
data  currently  received,  it  found  no  necessity  for  changes  in  design  or  in  specifications, 
but  recommended  that  the  subject  be  continued. 

During  the  past  year,  through  observations  of  tests  in  progress  and  examinations 
of  joint  bar  failures,  the  subcommittee  has  obtained  data  bearing  on  some  of  the 
theories  as  to  the  causes  of  failure  and  suggested  measures  for  relief  from  or  the  pre- 
vention of  failures.  This  investigation  embraces  actual  service  data,  full  size  of  fatigue 
tests  and  laboratory  studies. 


Fig.  1. — Progressive  Fatigue  Cracks  Starting  at  Sharp  Corner  of  Spike  Slot. 


Rail  667 


Fig.  2. — Progressive  Fatigue  Cracks  at  Upper  Contact  Surface  of 
Head-Contact  Bar  Originating  at  "A". 

These  types  of  cracking  may  or  may  not  result  in  complete  breakage  of  the  bar 
in  track.  That  breakages  do  occur  in  track  is  well  known,  and  typical  examples  are  shown 
in  Figures  3  and  4. 

The  two  most  common  types  of  cracking  are  illustrated  in  Figures  1  and  2,  namely, 
(1)  fatigue  cracks  originating  in  the  spike  slot,  and  (2)  fatigue  cracks  originating  at  the 
upper  contact  surface  of  the  bar. 

The  committee's  previous  report  (Proceedings  for  1940,  Vol.  41,  pages  633-637)  gave 
in  detail  the  results  of  a  canvass  of  the  railroads  as  to  the  number  of  failures  occurring. 
While  the  seriousness  of  the  problem  may  not  be  evident  from  the  reported  failures, 
the  future  aspects  of  the  problem  deserve  consideration.  Some  railroads  are  having  bars 
break  in  track;  others,  in  their  reforming  operations,  have  found  it  necessary  to  scrap 
a  large  number  of  bars  which,  except  for  cracking,  might  otherwise  have  been  reclaimed. 
The  question  as  to  whether  the  presence  of  a  crack  seriously  reduces  the  stiffness  of  the 
joint  is  one  which  cannot  be  answered  on  the  basis  of  information  available  at  the 
present  time. 

To  study  possible  means  of  eliminating  the  cracking  of  joint  bars,  tests  in  track 
and  tests  in  the  laboratory  are  being  conducted  along  the  following  lines: 

1.  Resistance  to  cracking  by  improving  the  physical  properties 

2.  Photoelastic  studies  as  to  effect  of  design  and  bolt  tension 

3.  Fatigue  tests,  using  full  size  bars  of  various  design  in  assembled  joints 

4.  Observations  as  to  the  effect  of  saw  swelHng  of  the  rail  end 

1.  Improving  Physical  Properties 

Four  lots  of  100  pairs  of  bars  each  were  installed  in  the  track  of  the  Chicago, 
Burlington  &  Quincy,  near  Ft.  Morgan,  Colo.,  MP  460  to  461.8.  The  four  lots  are  all 
of  the  same  rolled  section,  consisting  of — 

(a)  Common  chemistry,  common  heat  treatment 

(b)  Common  chemistry,  common    heat    treatment    plus    flame    hardened    on    top 
bearing  surface  at  the  center 

(c)  Common  chemistry,  water  quenched  and  drawn 

(d)  Different   chemistry,   heat    treated    (yield   point    minimum    of    85,000   lb.   per 
sq.  in.  and  tensile  strength  of  120,000  lb.  per  sq.  in.) 


668 


Rail 


Fig.  3. — ^Typical   Broken   Bars  Resulting   From   Fatigue 
Cracks  in  Spike  Slots. 


ip|piri;ig||p|||ipppi||i!^ 

*^!i>»»«»««i>»w»>iii1wiaii>iiia>iwii«iiMi»-^^ 


'  -nfmf»»f«-~«i    '     II nr 'a-nwiwwXify 


Fig.  4. — ^Typical  Broken  Bars  Resulting  From  Progressive 
Fatigue  Cracks  Originating  in  Upper  Contact  Surface. 


Rail 


669 


Fig.  5. — Illustration  of  Stress  Concentration  at  a   Square  Corner. 


Fig.  6. — Showing  Stress  Concentration  at  Outside  of 
Top  Fishing  Surface  of  Model  of  Bars  Which  Cracked  and 
Broke  in  Service  as  Shown  by  Figures  2  and  4. 


I 


The    bars   were   placed   in    track   in   July    1939,    observational   measurements   being 
made  semi-annually,  but  no  conclusions  have  as  yet  been  obtained. 

2.  Photoelastic  Studies 

Photoelastic  studies,   using  bakelite   models,   to  determine  the   effect  of   design  and 
bolt  tension  are  being  made  in  the  laboratory  of  the  Denver  &  Rio  Grande  Western*. 

*  For  a  more   complete   account   of   these   photoelastic  studies,   see  the   monograph   by  W.   B.   Leaf 
on  page  682. 


670 


Rail 


Fig.  7. — Showing  Stress  Concentration  at  Inside  of  Bottom 
Fishing  Surface  of  a  Model  of  Bars  Which  Cracked  and  Broke 
in   Service   as   Shown   by   Figures   2    and   4. 


Fig.  8. — Assembled  Joint  in  the  Fatigue  Testing  Machine. 


Examples  of  these  studies  follow: 

Figure  S  illustrates  by  means  of  photoelastic  study  of  a  bakelite  model,  the  stress 
concentration  which  occurs  in  the  square  corner  of  a  spike  slot,  which  may  cause  the 
progressive  fatigue  failures  to  develop  as  is  shown  in  Figures  1  and  3. 

Similar  photoelastic  studies  of  bakelite  models  of  toeless  bars  have  shown  that 
cracking  is  associated  with  the  cocking  tendency  of  the  section.  As  an  example,  Figures  6 


Rail 


671 


and  7  show  the  stress  concentration  at  the  outside  of  the  top  fishing  surface  and  the 
inside  of  the  bottom  fishing  surface,  respectively,  of  a  section  which  is  known  to  have 
given  trouble  in  service.  The  stress  concentrations  in  this  case  have  been  shown  to  be 
due  to  the  natural  cocking  tendency  of  the  section.  The  stress  concentration  is  greatest 
at  the  upper  fishing  surface  and  furthermore  occurs  at  the  point  where  cracks  in  service 
originate.  This  is  shown  by  a  comparison  of  Figures  6  and  2. 

Photoelastic  studies  are  being  made  of  models  of  the  various  conventional  sections. 
No  conclusions  have  as  yet  been  reached. 

3.  Fatigue  Testing 

Fatigue  tests  of  fully  assembled  rail  joints  are  being  conducted  by  the  Colorado 
Fuel  &  Iron  Corporation,  Pueblo,  Colo.,  in  cooperation  with  the  Denver  &  Rio  Grande 
Western,  by  mounting  the  assembled  joint  on  supports  36  in.  apart  and  loading  it  at 
the  center  with  a  concentrated  load  of  65,000  lb.  at  a  rate  of  SO  applications  per  minute. 
All  joints  were  made  up  with  20,000  lb.  bolt  tension.  This  method  of  testing  was  found 
to  produce  cracks,  identical  with  those  encountered  in  service.  Figure  8  shows  the 
assembled  unit  ready  for  test. 

Typical  sections  being  tested  are  shown  in  the  table  (all  bars  rolled  to  standard 
AREA  specifications  unless  otherwise  shown). 

Fatigue  tests  are  also  being  conducted  at  the  University  of  Ilhnois  laboratory  in  the 
rolling-load  machine  in  connection  with  the  work  of  the  Special  Committee  on  Stresses 
in  Railroad  Track. 

The  tests  have  not  been  completed  and  no  conclusions  are  offered. 


Rail 

Bar 

Weight 

Length 

Sec. 

Pounds 

Inches 

No. 

Bar  Tyfie 

Modificatiorxs 

110 

24 

T-91312 

H. 

C. 

Long  Toe 

None 

112 

B-4 

H. 

F.- 

— Center  overfill 

Easement — T.  C. 

;'; 

RE 

H. 

C. 

None 

Flame  Hard.— T.  C. 

&  Easement— T.  C. 
2"  Easement — T.  C— Hot  Worked 
I.  M.  Steel— As  Rolled 

'       Oil  Quenched 

"  "       "           "         "           and  tempered 

" 

B-3 

" 

None 

I 

B^4 

H. 
H. 

F. 
C. 

— C.  B. 

H.  C.  Reformed  to  H.  F. 
2"  Easement — T.C. 
1" 

%"  Lower  bolt  holes 
"         "           "       "     &  Easement 
Flame  Hard.— T.  C. 

"         "             "      &  Easement 

" 

36 

" 

" 

None 

" 

24 

B-34-1 

"; 

Flame  Hard.— T.  C. 
Water  Quench  &  Tempered 
.70  C  Oil  Quench  &  Tempered 

" 

" 

A-14 

H. 

F. 

None 

" 

" 

A-59 

H. 

C. 

Long  toe 

• 

131 

36 

B-8 
RE 

H 

C. 

', 

" 

" 

A-13 

H 

F. 

Long  toe 

• 

" 

" 

A-39 

H 

C. 

"       " 

' 

" 

" 

B-17 

H 

C. 

— C.B. 

: 

B-2 

Notes 
T.  C.=Top  center 
H.  C.^Head  contact 
H.  F.=Head  free 
I.  M.=Intermediatc  Manganese 


672 Rail 

4.  Effect  of  Saw  Swelling 

Observations  in  track  and  on  fatigue  tests  are  being  made  to  determine  the  effect 
of  saw  swelling. 

In  conclusion,  the  results  of  the  investigations  to  date  indicate  the  possibility  of 
changes  in  design  and  specifications,  and  this  report  is  offered  as  information  with  the 
recommendation  that  the  subject  be  continued. 


Photoelastic  Investigation  of  Design  of  Joint  Bars 
A  Monograph  Supplementing  the  Report  on  Assignment  7 

By  W.  B.  Leaf 
Research  Technician,   Denver  &  Rio  Grande  Western  Railroad 

The  photoelastic  method  of  investigation  is  a  means  of  determining  the  elements  of 
design  of  any  machine  part  or  structure.  It  tells  us  nothing  of  the  metallurgy  or  physical 
properties  of  the  part  under  consideration.  Strictly  speaking,  all  that  the  photoelastic 
method  tells  us  is  the  ratio  between  applied  load  and  stress  developed  in  the  model 
itself.  However,  if  the  model  truly  represents  the  prototype,  and  the  model  loading  rep- 
resents the  prototype  loading;  and  further  if  the  model  is  to  full  scale,  the  ratio  between 
loading  and  developed  stress  at  all  points  is  the  same  in  both  model  and  prototype. 
Only  one  further  precaution  must  be  observed.  The  model  must  not  be  strained  beyond 
the  proportional  limit,  and  it  must  be  assumed  that  the  prototype  is  similarly  treated. 

Description 

The  photoelastic  method  consists  of  observing  a  model  made  from  any  transparent 
solid  or  semi-solid,  in  plane  or  circularly  polarized  light.  When  the  model  is  loaded  the 
stress  distribution  is  immediately  seen  as  a  series  of  color  cycles  through  the  model,  if 
white  light  is  used.  Or,  if  monochromatic  light  is  used,  the  stress  pattern  is  seen  as  a 
succession  of  light  and  dark  bands  across  the  model. 

Thus,  if  the  model  is  merely  a  rectangular  bar  under  a  uniform  bending  moment 
along  a  portion  of  its  length,  as  in  Fig.  1,  and  if  the  load  be  steadily  increased,  cycles  of 
color,  or  alternate  dark  and  light  bands,  are  constantly  generated  at  the  two  outer  edges 
of  the  bar  and  each  one  of  these  moves  inward  towards  the  neutral  axis.  The  neutral 
axis  remains  uniformly  dark,  and  as  the  bands  move  inward,  they  become  closer  spaced. 
It  will  be  seen  that  the  number  of  bands  between  the  neutral  axis  and  the  outer  edge  is 
directly  proportional  to  the  applied  bending  moment.  So  the  photoelastic  constant  of 
the  material  may  be  determined.  This  constant  is  the  stress  value  per  band,  or  cycle, 
directly  in  terms  of  compression  or  tension  per  square  inch.  Strictly  speaking  any  one 
band  shows  the  area  in  which  the  shear  value  is  constant.  However,  at  a  free  boundary 
of  the  model  the  stress  pattern  gives  directly  the  compression  or  tension  at  that  boundary. 
There  is  no  evidence  in  the  pattern  as  to  whether  the  stress  is  compression  or  tension. 
This  must  be  determined  by  a  compensator  or  other  means  easily  employed. 

Application  to  Joint  Bar  Studies 

There  are  a  number  of  ramifications  and  refinements  in  the  method  which  need 
not  be  considered  here.  The  subject  at  hand  is  a  photoelastic  investigation  of  the  various 


Rail 


673 


joint  bar  designs  being  studied  in  the  test  tracks  on  the  Atchison,  Topeka  &  Santa  Fe 
Railway  and  the  Pennsylvania  Railroad. 

In  Fig.  2  the  head  contact  bars  are  drawn  as  wedges,  with  lines  connecting  the 
ends  of  the  fishing  surfaces.  It  is  seen  at  once  that  as  wedges  the  designs  leave  something 
to  be  desired. 


Fig.  1. — Rectangular  Bar  Under  Uniform  Bending  Moment 
Through  Center  Portion. 


B34   \\2 


A.RIA. 


o.tst 

«.  14 


^z^  \3\ 


P.RR  F4 


B  19 


A.R.t.A 


Fig.  2. — Various  Head-Contact  Joint  Bars  of  Test  Sections  Drawn  as  Wedges  to 
Show  Relative  Instability  Against  Cocking.  Fishing  Surfaces  Shown  in  Theoretical 
Relative  Positions. 


674 


Rail 


Fig.  3. — ^Wedge  of  Conventional  Shape  Similar  to  Joint  Bar. 
Location  of  Fishing  Surfaces  Symmetrical.  Fishing  Surfaces  of  Equal 
Length.  No  Cocking  and  no  Stress  Concentration. 


Fig.  4.— Wedge  Similar  to  Fig.  3.  Top  Fishing  Surface  Yz  in. 
in  Length.  Inner  Contact  Points  Symmetrically  Located.  No  Cocking, 
But  Slight  Stress  Concentration  at  Top. 


Rail 675 

Consider  what  might  happen  as  these  various  wedges  are  forced  between  the  fishing 
surfaces  of  a  rail  or  some  similar  shape  with  wide  fishing  surfaces.  A  symmetrical  wedge 
with  long  surfaces,  as  in  Fig.  3,  would  move  straight  inward  as  far  as  the  distortion 
and  elasticity  of  the  metal  would  allow  it  to  go.  Distortion  of  the  wedge  would  be 
uniform  at  the  top  and  bottom  if  the  rail  were  rigid.  However,  a  wedge  with  very 
short  surfaces  might  rotate  slightly  as  it  moves  inward.  This  is  especially  true  of  such 
a  wedge  as  the  A  39  131-lb.  section,  or  the  P.R.R.  F4  as  shown  in  Fig.  5,  where  the 
top  surface  is  somewhat  to  the  left  of  the  bottom  one.  If  the  wedge  should  rotate  a 
small  unit  about  a  point  near  E,  the  amount  of  metal  which  would  have  to  be  distorted 
at  the  top  is  a  function  of  the  external  secant  of  a  small  angle  multiplied  by  the  area 
of  the  surface.  If  the  wedge  should  rotate  a  small  unit  about  a  point  near  the  inside 
at  the  top  of  the  wedge,  the  corresponding  amount  of  metal  to  be  distorted  is  a  function 
of  the  external  secant  of  a  much  larger  angle  multiplied  by  a  much  larger  area.  The 
various  angles,  their  external  secants  and  their  product  of  multiplication  by  the  area 
for  a  unit  length  of  wedge  are  listed  in  the  table.  The  angles  are  arrived  at  by  this  means: 

With  a  point  E,  which  is  O.OS  in.  inside  the  top  or  bottom  contact  surface  as  a 
center,  a  circle  of  suitable  radius  is  drawn  to  intersect  the  opposite  contact  surface  at 
its  mid  point.  The  angle  then  is  that  one  between  a  tangent  to  the  circle  at  its  inter- 
section with  the  contact  surface,  and  the  contact  surface,  in  the  plane  of  the  diagram. 
The  dimension  0.05  in.  is  used  because  the  center  of  the  Hne  bearing  formed  with  a 
cocked  bar  is  at  about  this  location. 

Table  of  Properties 

A  ngles 
Section  top  and  bottom 

B   34   112    12°25' 

25°00' 
AREA  112    13°30' 

24°15' 
A   39   131    11°35' 

24°35' 
P.R.R.  F4  131    12°50' 

21°4S' 
B   19   131    12°.50' 

22°30' 
AREA  131  15°15' 

23°40' 

These  figures  control  the  initial  tendency  of  the  bar  to  cock. 

Naturally,  as  soon  as  any  cocking  takes  place,  the  further  movement  of  the  bar  is 
controlled  by  the  new  condition  then  in  effect  as  to  relative  locations  of  the  contact 
surfaces  and  their  widths. 

After  the  wedge  cocks  inward  at  the  top,  contacts  are  made  at  points  slightly  inside 
the  theoretical  ends  of  the  fishing  surfaces,  as  at  D  and  E,  or  as  shown  in  Fig.  6  for 
the  112-lb.  B  34  bar.  The  closely  spaced  stress  "loops"  show  a  stress  concentration  with 
a  tendency  to  form  a  line  bearing. 

The  relative  locations  of  these  points  for  the  different  sections  are  indicated  by  the 
figures  for  C-B  in  Fig.  2.  If  Z)  is  directly  above  E,  the  shape  is  relatively  stable  in  the 
cocked  position,  since  the  amounts  of  distortion  at  the  top  and  bottom  for  additional 
inward  movement  are  equal.  However  if  D  is  relatively  distant  to  the  right  of  E,  as  in 
the  AREA  131-lb.  wedge,  the  cocked  position  is  not  the  stable  one,  and  the  bar  will  tend 


Ex.  sec. 

Widths  times 

of  angles 

es.sec. 

0.024 

0.012 

0.103 

0.116 

0.028 

0.015 

0.097 

0.109 

0.021 

0.012 

0.100 

0.100 

0.026 

0.011 

0.077 

0.062 

0.026 

0.011 

0.082 

0.080 

0.036 

0.018 

0.092 

0.128 

676 


Rail 


Fig.  5.— P.  R.  R.  Section  F4  131-lb.  Bar.  Slight  Cocking 
Tendency  and  Stress  Concentration. 


Fig.  6. — B  34  112-lb.  Bar,  Showing  High  Compressive  Stress  at 
Outside  of  Top  and  Inside  of  Bottom  Fishing  Surfaces.  Bar  Cocked 
and  Having  Line  Bearing. 


Rail 677 

to   uncock  itself.  The   two   committee   bars  are   the   only   shapes  in   which   D  is   any 
appreciable  distance  to  the  right  of  E.  The  131 -lb.  AREA  bar  is  shown  in  Fig.  7. 

As  to  110-lb.  Bars 

One  of  the  mysteries  attending  the  cracking  of  112-lb.  head-contact  bars  was  the 
lack  of  trouble  in  the  110-lb.  bars  of  supposedly  similar  section.  The  reason  for  this 
lack  of  similar  cracking  in  the  110-lb.  bars  becomes  evident  in  the  light  of  this  analysis. 
The  dimension  A  for  the  110-lb.  long-toe  section,  as  used  by  the  D.&RXi.W.  is  0.35  in., 
which  is  bad,  but  C-B  is  0.18,  which  is  favorable.  In  the  toeless  110-lb.  bar  A  is  0.29  in., 
again  bad,  but  "C-B"  is  0.20  in.  Since  the  fishing  height  of  110-lb.  rail  is  13/32  in. 
lower  than  that  of  the  112-lb.  rail,  angles  become  greater  for  less  relative  lateral  distances, 
and  a  small  change  in  angle  produces  a  relatively  large  change  in  external  secant. 

Wedges  with  controlled  bearing  at  the  top  can  only  be  less  stable  than  the  plain 
ones,  since  less  than  the  usual  amount  of  metal  must  be  distorted  for  top  inward 
movement,  and  since  unit  bearing  pressures  are  higher,  due  to  the  restricted  bearing  area. 

Other  Factors  Influence  Wedge  Action 

Obviously  there  are  a  number  of  minor  factors  which  influence  the  action  of  the 
wedges.  Friction  between  the  surfaces,  gouging,  location  of  bolt  holes,  rigidity  of  bolt 
head,  etc.,  etc.,  are  some  of  them.  Friction  becomes  low  over  a  period  of  time  because 
of  vibration  and  the  longitudinal  movement  between  bar  and  rail.  Gouging  cannot  be 
great  as  there  are  no  sharp  edges  on  the  wedges.  Slight  cocking  is  accompanied  by  a 
change  in  the  average  point  of  thrust  by  the  bolt  head  against  the  bar.  But  the  bolts 
are  flexible,  and  to  stabilize  such  a  shape  as  A  39,  the  bolt  hole  would  have  to  be 
dropped  1)4  in.,  as  indicated  by  the  restraining  influence  ratio  between  top  and  bottom. 
Thus  the  bolt  has  to  be  lowered  to  a  point  such  that  the  products  of  lever  arms  and 
restraints  become  about  equal. 

It  is  significant  that  the  bolts  of  112  and  131-lb.  sections  are  the  same  distance 
from  the  top  fishing  surface  intersections.  This  is  faulty  design,  since  the  131-lb.  bars 
then  have  a  relatively  high  bolt,  with  increased  cocking  tendencies. 

High  Bearing  Pressures 

The  evils  of  cocked  bars  are  in  that  the  bearing  areas  are  restricted  and  unit 
compression  is  high.  At  the  top  of  the  bar,  a  wheel  load  imposes  further  compression, 
the  total  quantity  being  tied  up  in  a  calculation  involving  Poissons  ratio.  The  amount 
of  added  compression  from  wheel  load  is  a  function  of  track  stiffness,  etc. 

With  a  20,000-lb.  bolt  tension,  which  is  not  unusual,  the  theoretical  compression 
at  the  top  of  a  112-lb.  bar  with  j4-in.  contact  at  the  fishing  surface  is  13,850  lb.  per 
sq.  in.  If  a  Hne  bearing  is  effected,  with,  say,  /^-in.  width,  the  figure  becomes  55,400  lb. 
per  sq.  in.  which  is  beyond  the  yield  point.  Obviously,  if  the  total  unit  compression  is 
beyond  the  yield  point  of  the  metal,  plastic  flow  occurs  during  the  downward  move- 
ment of  the  joint,  and  during  upward  movement  a  portion  of  the  deformed  metal  is 
then  in  tension.  Hence  a  fatigue  failure. 

At  the  bottom  of  the  bar,  the  positive  moment  tends  to  reduce  the  unit  contact 
compression,  hence  the  overall  stress  is  less,  and  failure  occurs  from  the  top  down.  The 
progress  of  the  crack  is  rapid  shortly  after  its  first  appearance,  but  becomes  less  rapid 
as  the  area  of  high  stress  from  contact  pressures  is  left  behind. 

Negative  moments  are  not  as  great  as  positive  ones,  so  the  bottom  of  the  bar  is 
not  in  as  high  overall  stress  as  is  the  top.  Failures  from  cocked  131-lb.  bars  are  to  be 


678 


Rail 


Fig.  7.— AREA  131-lb.  Bar,  Showing  Slight  Cocking  Tendency 

and  Slight   Concentration  of  Compressive  Stress. 


Fig.  8.- 


-131-lb.  Head-Free  Bar.  Note  the  Absence  of  Any  Stress 
Concentration    From    Line    Bearings. 


ft 


Rail 679 

expected  but  not  in  as  short  a  time  as  in  the  112-lb.  bars  since  the  rail  and  joint  are 
much  stiffer,  and  bending  stresses  are  thus  much  reduced. 

Only  one  head-free  bar  has  been  modeled,  since  this  design  is  necessarily  stable  in 
its  position.  If  properly  rolled  and  applied,  no  Une  bearings  will  result.  Fig.  8  shows 
a  131-lb.  head-free  model. 

It  is  my  contention  that  certain  types  of  joint  bar  failures  are  caused  by  the  in- 
stability of  the  shapes  considered  as  wedges.  A  Une  bearing  rather  than  a  full  surface 
contact  increases  contact  stresses  due  to  bolt  tension  and  may  exceed  the  endurance 
limit  of  the  material.  Failures  are  hastened  by  high  bolt  tension  and  swelled  rail  ends. 

A  remedy  may  be  found  in  redesigning  the  bars  to  make  a  more  stable  wedge  by 
lowering  the  bolt  holes  where  possible  and  using  reasonable  bolt  tensions. 


Seventh  Progress  Report  of  the  Joint  Investigation 
of  Fissures  in  Railroad  Rails 

By  H.  F.  Moore 

Research  Professor  of  Engineering  Materials,  University  of  Illinois, 
in  Charge  of  the  Investigation 

Summary 

1.  Fissures  starting  from  the  interior  of  the  head  of  railroad  rails  first  were  recog- 
nized as  important  about  1911.  Much  discussion  has  taken  place  as  to  whether  they 
were  caused  by  minute  flaws  in  rail  steel  (shatter  cracks)  or  by  the  heavy  wheel  loads 
on  rails.  The  development  of  detector  cars  made  possible  the  detection  of  many  fissures 
before  rail  fracture  had  occurred,  but  it  did  not  touch  the  problem  of  prevention  of  fis- 
sures. In  1031  a  joint  investigation  was  sponsored  by  the  manufacturers  of  steel  rails, 
the  Association  of  American  Railroads  and  the  Engineering  Experiment  Station  of  the 
University  of  Illinois,  (pages  682^86) 

2.  A  "rolling-load"  testing  machine  was  designed  and  built  which  subjected  a  speci- 
men of  rail  to  repeated  cycles  of  wheel  load  and  bending  moment.  Before  testing  in  this 
machine  an  etch  test  to  detect  the  presence  of  shatter  cracks  was  made  on  the  rail  from 
which  the  specimen  was  cut.  A  long  series  of  rolling-load  tests  showed  the  following 
results: 

(a)  In  these  rolling-load  tests  only  shatter-cracked  rails  developed  fissures,  but  not 
all  shatter-cracked  rails  developed  fissures. 

(b)  It  is  the  complex  stresses  directly  under  a  wheel  load  which  cause  cracks  to 
develop  into  fissures.  Bending  moment  tends  to  cause  fissures  to  take  a  trans- 
verse direction,  and  accelerates  their  spread. 

(c)  No  greater  wheel  load  was  required  to  start  a  fissure  in  a  heavy  rail  than  in  a 
Ughter  rail.  The  minimum  wheel  load  which  started  a  fissure  in  the  rolling-load 
tests  was  40,000  lb. 

(d)  The  wheel  load  necessary  to  start  a  fissure,  the  theoretical  shearing  stress  in  the 
zone  where  shatter  cracks  are  located,  the  fatigue  strength  of  rail  steel,  and  the 
weakening  effect  of  minute  cracks  (shown  by  fatigue  tests  of  specimens)  form 
a  coherent  picture  of  the  mechanism  of  fissure  formation  and  spread,  (pages 
686-691) 

3.  Extensive  tests  on  four  railroads  where  there  was  heavy  traffic  were  made  to  get 
some  statistical  idea  of  the  magnitude  and  frequency  of  high  wheel  loads  under  traffic. 
The  Deforest  scratch  extensometer  was  used  to  measure  mean  strain  in  rail  bases  under 
passing  trains.  From  these  strains,  wheel  loads  were  computed.  Records  of  strain  under 
some  500,000  wheel  loads  were  obtained,  and  it  was  found  that  at  any  location  the  average 
occurrence  of  wheel  loads  of  40,000  lb.  or  over  was  one  in  1,000  wheel  loads.  At  some 
locations  the  frequency  was  as  much  as  three  times  this;  i.e.  three  in  1,000.  (pages 
692-696) 

4.  A  large  number  of  hot-bed  cooled  test  rails  have  been  placed  in  various  locations 
on  the  Baltimore  &  Ohio  Railroad  and  on  the  Atchison,  Topeka  &  Santa  Fe  Railway. 
The  service  record  and  the  detector  car  tests  made  on  these  test  rails  have  been  carefully 
followed  in  the  course  of  this  investigation.  All  fissures  developing  in  service  or  found 
by  a  detector  car  have  occurred  in  shatter-cracked  rails,  (pages  696-701) 

5.  The  solution  of  the  problem  of  preventing  shatter  cracks  in  rails  was  attacked  by 
making   tests   of   specimens   from   rails   cooled   in   air  and   also   controlled   cooled.  Tests 

681 


682 Investigation    of   Fissures   in    Railroad   Rails 

were  made  at  various  steel  mills  using  rail  specimens,  each  specimen  being  cooled  in  an 
individual  cooling  box  under  carefully  controlled  and  measured  conditions.  Variations  in 
rate  of  cooling,  temperature  at  placing  specimens  in  boxes,  temperature  of  removal 
from  boxes  and  time  in  boxes  were  studied.  In  some  tests  hydrogen  was  introduced  into 
one  molten  ingot  so  that  rails  rolled  from  that  ingot  and  cooled  in  air  would  be  sure  to 
have  many  shatter  cracks.  It  was  found  that  rail  specimens  placed  in  a  cooling  con- 
tainer at  temperatures  not  less  than  700  deg.  F.,  and  which  required  not  less  than  7  hours 
to  cool  to  300  deg.  F.  in  the  coohng  box  developed  no  shatter  cracks  even  in  rail  specimens 
from  hydrogen- treated  ingots,  (pages  702-718) 

6.  The  Brunorizing  (normalizing)  process  of  thermal  treatment  of  rails  was  also 
studied,  and  the  modified  process  as  now  practiced  was  found  effective  in  preventing 
shatter  cracks,  (pages  718,  719) 

7.  Extensive  studies  of  metallographic  structure  and  of  the  strength  and  toughness 
of  rail  steel  have  been  made.  Some  studies  of  chemical  composition  have  been  made,  but 
the  slight  variation  of  chemical  composition  in  the  test  rails  furnished  did  not  appear 
to  be  a  major  factor.  Results  of  these  studies  are  given  in  this  report,   (pages  719-743) 

8.  A  large  amount  of  study  has  been  given  to  the  problem  of  finding  a  non- 
destructive test  which  could  be  used  to  detect  shatter  cracks  in  new  rails.  In  common 
with  the  work  of  previous  investigators  this  effort  has  so  far  been  unsuccessful.  Shatter 
cracks  are  so  minute  that  changes,  due  to  these  shatter  cracks,  in  properties  or  structure 
of  metal  around  them,  are  masked  by  other  variations  in  the  metal,  (pages  743-747) 

9.  Experimental  studies  of  a  bend  test  for  rails  to  supplement  or  to  replace  the  drop 
test  have  been  made.  Like  previous  investigators  the  members  of  the  test  party  have 
found  the  bend  test  distinctly  superior  to  the  drop  test,  (pages  747-750) 

10.  Unfinished  work  of  the  investigation  relating  to  fissures  includes  formulation  of 
proposed  standards  for  control  cooling  of  rails  and  for  bend  tests  for  acceptance  of  rails, 
(page  751) 

11.  The  work  of  the  investigation  on  end  batter  and  end-hardened  rails  will  be  the 
subject  matter  of  a  separate  report. 

Foreword 

This  Seventh  Progress  Report  of  the  Rails  Investigation  is  a  summary  of  the  work 
on  the  causes  and  prevention  of  fissures  which  has  been  carried  on  since  the  beginning 
of  the  investigation  in  1931.  A  subsequent  progress  report  will  discuss  the  present  status 
of  the  tests  for  batter  of  end-hardened  rails. 

In  this  report  are  given  a  few  results  of  tests  of  specimens  cut  from  end-hardened 
rails.  These  are  included  as  a  contribution  to  present-day  knowledge  of  rail  steel  as  a 
structural  material. 

I  Introduction 

1.  Historical. — In  1911  the  interest  of  steel  manufacturers  and  railroads  was  aroused 
by  a  failure  of  a  rail  on  the  Lehigh  Valley  Railroad.  An  examination  showed  that  this 
failure  was  a  fracture  apparently  starting  on  the  inside  of  the  head.  Other  fractures  of 
this  type  were  reported  until  they  became  a  serious  problem  to  the  railroad  men  and  the 
steel  rail  manufacturers.  A  great  deal  of  discussion  arose  as  to  whether  these  fissures  were 
due  to  the  increased  wheel  loads  which  rails  had  to  withstand  or  whether  they  arose 
from  defects  in  the  steel.  Etch  tests  by  Wickhorst^  and  by  Waring  and  Hofammann,* 
showed  a  large  number  of  small  cracks  in  specimens  cut  from  new  rails.  (See  Fig.  1)  The 
question  was  at  once  raised  whether  these  cracks  were  present  in  the  original  rails,  or 

'  Wickhorst,  M.  H. — Internal  Fissures  in  New  Rails,  AREA  Proceedings,  Vol.  16,  p.  389   (1915). 
^Waring,  F.  M.  and  Hofammann,  K.  E.— Deep  Etching  of  Rails  and  Forgings,  ASTM  Proc.,  Vol.  19, 
Part  II,  p.  183  (1919). 


Investigation    of    Fissures    in    Railroad    Rails 683 


(a)  No  Shatter  Cracks  (b)   Shatter  Cracks 

Fig.  I. — Etch  Tests  on  Specimens  Cut  From  Two  Rails. 

were  caused  by  the  etching  process  itself.  The  records  of  the  AREA  showed  a  tendency 
for  these  "transverse  fissure"  failures,  as  they  were  called,  to  develop  in  rail  laid  in  loca- 
tions subjected  to  especially  heavy  traffic,  and  also  to  be  more  frequent  in  the  rails 
rolled  from  certain  mills  than  others.  However  rails  rolled  in  different  years  by  the  same 
company  also  showed  a  wide  variation  in  the  prevalence  of  transverse  fissure  failures. 

The  development  of  the  detector  car  about  1928  by  E.  A.  Sperry  under  the  sponsor- 
ship of  the  American  Railway  Association  made  it  possible  to  detect  the  presence  of  many 
of  these  internal  fissures  before  they  had  spread  so  far  as  to  cause  actual  fracture  of  the 
rail.  However,  this  did  not  meet  the  problem  of  the  cause  and  prevention  of  such  fissures; 
and  the  removal  of  broken  rails  and  rails  in  which  fissures  have  been  detected  constitutes 
a  very  considerable  item  of  expense  to  the  maintenance  of  way  departments  of  railroads. 

2.  Organization  of  the  Investigation  of  Fissures  in  Railroad  Rails. — In 
1931  there  was  formally  started  a  joint  investigation  of  the  problem  of  internal  fissures 
in  railroad  rails.  The  investigation  was  organized  under  the  auspices  of  the  Rail  Manu- 
facturers' Technical  Committee  and  the  American  Railway  Association  (now  the  Asso- 
ciation of  American  Railroads),  acting  through  the  American  Railway  Engineering 
Association.  These  two  cooperators  asked  the  Engineering  Experiment  Station  of  the 
University  of  Illinois  to  undertake  the  direction  of  the  investigation. 

To  keep  in  touch  with  the  progress  of  the  investigation,  the  Technical  Committee 
of  Rail  Manufacturers  and  the  AREA  Committee  on  Rail  appointed  an  advisory  com- 
mittee and  later  appointed  a  small  body  from  this  advisory  committee  to  serve  as  a 
contact  committee.  The  present  members  of  the  advisory  committee  are: 

Association  of  American  R.mlro.ads — Rail  Committee: 

W.  H.  Penfield,  Chief   Engineer,  Chicago,  Milwaukee,  St.   Paul  &   Pacific  Railroad 

(Chairman) 
J.  E.  Armstrong,  Chief  Engineer,  Canadian  Pacific  Railway 
W.  C.  Barnes,  Engineer  of  Tests,  Rail  Committee,  AREA 
C.  B.  Bronson,  Inspecting  Engineer,  New  York  Central  System 


684 Investigation    of    Fissures    in    Railroad    Rails 

E.  E.    Chapman,    Mechanical    Assistant    to    Assistant    to    Vice-President,    Atchison, 
Topeka  &  Santa  Fe  Railway 

H.  R.  Clarke,  Engineer  Maintenance  of  Way,  Chicago,  Burlington  &  Quincy  Railroad 
G.  M.  Magee,  Research  Engineer,  Engineering  Division,  AAR 
P.  Petri,  Chief  Engineer  Maintenance,  Baltimore  &  Ohio  Railroad 
Louis  Yager,  Assistant  Chief  Engineer,  Northern  Pacific  Railway 

Rail  Manufacturers'  Technical  Committee: 

L.   S.  Marsh,   Manager,   Department   of   Inspection   and   Metallurgy,    Inland   Steel 
Company   (Chairman) 

F.  W.   Bendell,    Manager,    Railroad   Materials   and    Commercial   Forgings   Bureau, 

Chicago   District,   Carnegie-Illinois  Steel  Corporation 
O.  U.  Cook,  Assistant  Manager,  Department  of  Metallurgy,  Inspection  and  Research, 
Tennessee  Coal,  Iron  &  Railroad  Company 

E.  F.  Kenney,  Metallurgical  Engineer,  Bethlehem  Steel  Company 
J.  H.  Reece,  Chief  Inspector,  Colorado  Fuel  &  Iron  Company 

F.  A.  Wickerham,  Assistant  to  Chief  Metallurgical  Engineer,  Carnegie-Illinois  Steel 

Corporation 

The  present  membership  of  the  contact  committee  is  as  follows: 

L.  S.  Marsh,  Chairman,  C.  B.  Bronson  E.  F.  Kenney 

W.  C.  Barnes  E.  E.  Chapman  G.  M.  Magee 

F.  W.  Bendell  O.  U.  Cook 

During  the  progress  of  the  investigation  the  following  persons,  who  are  no  longer 
members,  have  served  as  members  of  the  advisory  committee. 

Earl  Stimson  (Co-chairman  for  the  AREA)  Chief  Engineer  Maintenance,  Baltimore 

and  Ohio  Railroad  (deceased) 
John  V.  Neubert  (Co-chairman  for  the  AREA)  Chief  Engineer  Maintenance  of  Way, 
New  York  Central  System  (deceased) 

F.  W.  Wood  (Co-chairman  for  the  Technical  Committee  of  Steel  Rail  Manufacturers) 

Baltimore,  Maryland   (retired) 
John  Brunner,  Manager  Department  of  Metallurgy  and  Inspection,  Carnegie-Illinois 

Steel  Corporation  (deceased) 
A.  F.  Blaess,  Chief  Engineer,  Illinois  Central  Railroad  (deceased) 
John  S.  Unger,  Research  Engineer,  Carnegie  Steel  Company,  Pittsburgh  (retired) 

G.  J.  Ray,  Vice-President  and  General  Manager,  Delaware,  Lackawanna  &  Western 

Railroad 
W.  A.  Maxwell,  Jr.,  Vice-President,  Colorado  Fuel  &  Iron  Co. 
T.    H.    Sanderson,    Assistant    Superintendent    of    Rail   Mill,    Carnegie-Illinois    Steel 

Corporation,  Gary  Mill 
Maro  Johnson,  Principal  Assistant  Engineer,  Illinois  Central  Railroad 
R.  Faries,  Assistant  Chief  Engineer — Maintenance,  Pennsylvania  Railroad  (deceased) 
C.  F.  W.  Rys,  Chief  Metallurgical  Engineer,  Carnegie-Illinois  Steel  Corporation 
L.  H.  Bond,  Chief  Engineer  Maintenance  of  Way,  Illinois  Central  Railroad 
W.  P.  Wiltsee,  Chief  Engineer,  Norfolk  &  Western  Railway 

The  present  test  party,  which  is  carrying  on  the  work  of  the  investigation  includes 
the  following: 

H.  F.  Moore,  Research  Professor  of  Engineering  Materials,  University  of  Illinois,  in 
charge  of  investigation 


Investigation   of    Fissures   in    Railroad   Rails 685 

H.  R.  Thomas,  Special  Research  Professor  of  Engineering  Materials,  Engineer  of 

Tests,  in  charge  field  tests. 
R.    E.    Cramer,    Special    Research    Assistant    Professor    of    Engineering    Materials, 

metallurgical  work 
N.  J.  Alleman,  Special  Research  Associate,  rolling-load  tests,  bend  tests  of  rails 
J.  L.  Bisesi,  Special  Research  Associate,  non-destructive  tests  for  cracks,  inspection  of 

rails  in  test  tracks 
S.  W.  Lyon,  Special  Research  Assistant,  physical  tests  of  rail  steel 
Test  Assistant:  R.  S.  Jensen 

Student  Assistants  (part  time):  E.  C.  Lauck,  J.  C.  Leming,  William  Mareneck 
Mechanicians:  H.  Belles,  F.  A.  Ferris,  H.  H.  Griesheimer,  M.  K.  Shafer,  Harley 

Musgrove 
Assistant  in  Machine  Shop:  C.  Boley 
Clerk  and  Stenographer:  Rogene  Strode 

The  following  persons  have  been  members  of  the  test  party,  but  have  left  for  other 
positions: 

E.  C.  Bast,  G.  B.  Bliss,  W.  D.  Boone,  K.  Anderson,  R.  G.  Emerson,  John  Haake, 
G.  N.  Krouse,  J.  G.  Lowther,  J.  C.  Mace,  J.  A.  Nachowitz,  R.  S.  Hutton,  T.  J. 
Riggs,  N.  H.  Roy,  L.  G.  Ramer,  E.  F.  Ream,  J.  S.  Shapland,  J.  R.  Trimble, 
H.  Wallace,  C.  P.  Wampler,  H.  B.  Wishart,  Dave  Wiegand,  R.  J.  King,  R.  J. 
Houkal,  M.  W.  Woodruff,  J.  C.  Othus,  A.  E.  Abel,  Chas.  Middlesworth, 
H.  Hood,  D.  C.  Brown,  C.  Beiler,  P.  A.  Ramsdell,  J.  C.  Leming,  J.  O'Neal. 

3.  Previous  Investigation  of  Fissures  in  Rails. — ^While  the  problem  of  internal 
fissures  in  rails  is  of  comparatively  recent  origin,  rail  breakage  is  a  problem  as  old  as  the 
railroad.  In  the  early  days  the  list  of  noteworthy  research  workers  includes  Styffe  in 
Sweden,  Tetmajer  in  Switzerland,  Wohler  in  Prussia,  Kirkaldy  and  Sandberg  in  England, 
P.  H.  Dudley  and  C.  B.  Dudley  in  the  United  States. 

Since  the  1911  rail  failure  on  the  Lehigh  Valley  Railroad,  a  large  amount  of  study 
has  been  given  to  this  phenomenon  of  internal  fissures,  especially  to  transverse  fissures, 
and  the  names  of  Howard,  C.  B.  Dudley,  P.  H.  Dudley,  Gushing,  Wickhorst,  Comstock, 
J.  R.  Freeman,  Jr.,  Gennet,  Robert  Job,  Quick,  Rawdon,  Clayton,  Styri,  and  J.  B.  Young 
are  among  those  who  have  made  valuable  contributions. 

A  cooperative  investigation  under  the  auspices  of  the  Chicago  Rapid  Transit  Com- 
pany (the  elevated  railroad  service)  and  the  University  of  Illinois  Engineering  Experi- 
ment Station  was  in  progress  when  the  present  investigation  was  begun,  and  the  work 
of  this  earlier  investigation  was  taken  over  by  the  larger  investigation. 

4.  Strength  of  Railroad  Rails  and  Service  Demands  Upon  Them. — As  is  the 
case  with  very  many  problems  in  strength  of  materials,  the  question  of  failure  of  rails 
from  internal  fissures  involves  two  very  general  questions:  (1)  What  tensile  stresses, 
what  compressive  stresses,  and  what  shearing  stresses  will  rails  withstand  without  failure 
under  service  loads?  and  (2)  What  stresses  in  rails  are  set  up  in  actual  service?  The 
first  of  these  problems  involves  laboratory  tests  as  the  principal  means  of  solution.  The 
second  must  be  answered  by  field  tests  with  measurement  of  actual  stresses  measured 
under  train  service  at  a  large  number  of  typical  locations  where  rails  are  subjected  to 
heavy  traffic. 

5.  In  What  Ways  Can  Railroad  Rail  Failures  Be  Produced? — Railroad  rails 
in  service  are  subjected  to  a  remarkably  complex  system  of  stresses  and  strains.  It  is 
immediately  obvious  that  they  may  fail  by  direct  flexural  action,  and  the  classic  investi- 


686 


Investigation    of    Fissures    in    Railroad    Rails 


gations  of  Professor  A.  N.  Talbot  and  his  Committee  on  Stresses  in  Railroad  Track  have 
given  a  very  elaborate  analysis  for  computing  the  flexural  stresses  to  which  rails  are 
subjected  by  wheel  loads.  Rails  sometimes  fail  by  stresses  in  the  web  of  the  rail  but  this 
type  of  failure  obviously  does  not  originate  from  internal  fissures  in  the  head. 

Rails  may  fail  by  a  very  complex  system  of  localized  stress  set  up  directly  under  a 
wheel  load.  The  mathematical  determination  of  tensile,  compressive,  and  shearing  stresses 
under  a  wheel  resting  on  a  rail  was  developed  somewhat  previously  to  this  investigation 
independently  by  Professor  N.  M.  Belajef  in  Leningrad,  Russia,  and  a  little  later  by 
Professor  H.  R.  Thomas  and  Dr.  V.  A.  Hoersch  of  the  Department  of  Mathematics, 
University  of  Illinois.^  These  two  mathematical  analyses  gave  identical  results. 

PLASTIC   ACTION  (COLD  WORK)   DUE   TO 

WHEEL   LOAD   TAKES    PLACE     BELAJEF- 

HOERSCH    FORMULAS   FOR    STRESS   ARE      COMPUTED  SHEARING  STRESS -PS  I   X  1000 

NOT  ACCURATE   IN  THIS   ZONE  1  ^  °  2  S 


Grange  of  endurance  limit 
under  repeated  shear 
of  rail  steel  specimens 
with  minute  crack 


Fig.  2. — Computed  Shearing  Stress  in  Head  of  Rail  Under  a  Wheel 
Load  of  40,000  lb.  on  a  33-in  Wheel. 

An  internal  fissure  in  a  rail  suggests  that  shearing  stress  may  be  the  cause,  since 
shearing  stresses  tend  to  become  a  maximum  below  the  surface  of  a  beam.  The  theo- 
retical shearing  stresses  below  the  tread  of  a  rail  under  a  wheel  load  are  shown  in  Fig.  2. 
Actually  these  stresses  are  modified  by  the  fact  that  near  the  tread  of  the  rail  there  is 
plastic  action,  (cold  work)  so  that  the  actual  stresses  are  lessened  near  the  tread  of  the 
rail.  However,  as  was  shown  by  Thomas  and  Hoersch  there  is  evidence  that  at  a  depth 
of  3^  in.  below  the  tread  of  the  rail  there  is  fair  agreement  between  theoretical  stresses 
and  actual  stresses.  Figure  2  shows  the  theoretical  distribution  of  shearing  stress  over  a 
vertical-longitudinal  section  of  a  rail  head  under  a  wheel  load. 

The  complex  stresses  in  a  rail  directly  under  a  wheel  are  relatively  high,  and  are 
confined  to  a  small  region — very  small  in  comparison  with  the  full  section  of  the  rail. 
This  means  that  the  size  of  rail  will  make  little  difference  in  its  resistance  to  the  starting 
of  internal  fissures  in  the  head.  Moreover,  it  is  magnitude  of  wheel  load  which  is  signifi- 
cant rather  than  flexural  stress.  However,  owing  to  the  lower  flexural  stresses,  cracks 
will  probably  spread  more  slowly  in  a  heavy  rail  than  in  a  light  rail. 


II  The  Development  of  Internal  Fissures  in  Laboratory  Tests  of 

Rails  and  in  Rails  in  Service 

By  H.  F.  Moore 

6.  Test  Rails. — In  carrying  out  the  two  branches  of  the  investigation,  strength  of 
rails  and  service  conditions  which  they  must  meet,  there  were  supplied  by  five  different 
steel  mills  about  5,000  tons  of  130-lb.  rail  and  3,750  tons  of  110-lb.  rail  to  serve  as  test 


^  Thomas,    H.    R.   and   Hoersch,   V.   A. — Stresses   due    to   the    Pressure   of   One   Elastic   Solid    Upon 
Another,  Bulletin  212,  Eng.  Exp.  Sta.,  University  of  Illinois.  Mr.  Belajef's  work  is  published  in  Russian. 


Investigation    of    Fissures   in    Railroad   Rails 


687 


Fig.  3. — Testing  Machine  lor  Rolling-Load  Tests. 


rails.  These  five  mills  are  designated  by  the  letters  A,  B,  C,  D  and  E.  From  each  heat 
rolled  three  rails  were  sent  to  the  University  of  Illinois  to  furnish  specimens  for  various 
laboratory  tests.  The  130-lb.  rails  were  put  in  test  locations  on  the  Baltimore  &  Ohio 
Railroad  and  the  110-ib.  rail  on  test  locations  on  the  Atchison,  Topeka  &  Santa  Fe 
Railway. 

All  these  rails  were  rolled  under  ordinary  conditions  and  were  cooled  on  hot  beds. 
Unusually  complete  records  were  kept  at  all  stages  in  their  manufacture.  They  passed 
the  usual  routine  inspection  and  all  the  test  rails  were  from  heats  which  were  accepted. 


688 


Investigation    of    Fissures    in    Railroad    Rails 


About  289  rails  were  sent  to  the  University  of  Illinois  for  test  specimens  and  from  each 
one  of  these  rails  one  or  more  pieces,  six  inches  long,  were  sawed  off  at  least  three  feet 
from  the  end  of  the  rail.  The  head  of  each  piece  was  sliced  horizontally  and  the  piece 
then  etched  in  a  50  percent  solution  of  hydrochloric  acid  to  detect  shatter  cracks.  Eighty- 
two  of  the  rails  were  found  to  contain  shatter  cracks.  The  number  of  shatter  cracks 
found  in  an  etch  test  varied  widely.  Many  more  longitudinal  shatter  cracks  were  found 
than  transverse  shatter  cracks. 

7.  Rolling-Load  Testing  Machine  for  Developing  Internal  Fissures  in 
Rails. — A  special  testing  machine  was  built  in  which  a  specimen  of  rail  could  be  repeat- 
edly subjected  to  known  wheel  loads  and  bending  moments.  This  machine  is  shown  in 
Fig.  3.  In  this  machine  a  short  specimen  of  rail  5  is  pulled  backwards  and  forwards  under 
a  wheel  load  which  can  be  varied  from  zero  to  80,000  lb.  This  load  is  applied  through 
the  lever  L  by  means  of  the  screw  jack,  J,  and  is  measured  by  the  compression  of  the 
spring  P.  The  bending  moment  can  be  measured  as  the  product  of  the  weight  on  the 
wheel  times  /,  the  distance  of  "overhang"  of  the  specimen  rail  when  it  is  in  its  extreme 
left-hand  position;  /  can  be  varied  by  moving  the  block  B.  A  revolution  counter  is 
attached  to  the  crankshaft  of  the  machine,  and  an  automatic  cutoff  switch  is  operated  by 
the  drop  of  the  lever  L  when  a  specimen  fails.  The  stroke  of  the  machine  is  7  in.  and  its 
speed  60  r.p.m.  Three  of  these  machines  have  been  built  and  have  been  used  in  the  study 
of  fissures  in  rails  and  later  in  the  study  of  batter  of  rail  ends. 

8.  Results  of  Tests  of  Rails  Under  Repeated  Rolling  Load. — Tests  of  short 
lengths  of  rails  under  repeated  rolUng  load  in  the  special  testing  machines  designed  and 
built  for  this  investigation  have  developed  failures  starting  as  transverse  fissures  in  a 
considerable  number  (although  by  no  means  all)  of  the  newly-rolled  test  rails  which,  by 
means  of  etch  tests,  were  found  to  contain  shatter  cracks.  (See  Fig.  1).  No  failures  start- 
ing as  transverse  fissures  have  as  yet  been  developed  in  the  laboratory  in  newly-rolled 
rails  which  etch  tests  have  shown  to  be  free  from  shatter  cracks.  Such  uncracked  rails, 
when  they  fail  under  repeated  rolling  load,  fail  by  fatigue  cracks  starting  from  the  sur- 
face of  the  rail.  Moreover,  they  require  higher  wheel  loads  to  cause  fracture  than  do 
shatter-cracked  rails.  In  all,  some  147  rail  specimens  have  been  tested  in  the  special 
rolUng-load  testing  machines,  many  of  them  to  1,000,000  cycles  of  stress,  or  more. 
Figure*  4a  and  4b  show  the  two  types  of  spreading  fracture  which  occurred. 


FRACTURE    STARTED    HERE 


(a)  Fatigue  fracture  starting  at  sur- 
face; this  is  the  type  of  fracture 
in  rolling-load  tests  of  rail  speci- 
mens free  from  shatter  cracks. 


(b)  Internal  fissure  starting  from  nu- 
cleus in  rail  head;  this  is  the 
type  of  fracture  in  some  speci- 
mens with  shatter  cracks. 


Fig.  4. — Two  Types  of  Fracture  in  the  Rolling-Load  Test. 


Investigation    of    Fissures   in    Railroad   Rails 


689 


Table  1 

Individual  Fissures  Formed  Independently  of  Each  Other — Not  Compound 
Tests  in  Rolling-load  Testing  Machine 

Maximum 
Shearing 

Flexural  Stress  at  Point 

Stress              Type  of  of  Fracture 

lb.  per              Fissure  in  Rail  Head 

Specimen                                                                 sq.  in.            Developed  lb.  per  sg.  in. 

31-2     68,600                  Trans.  36,800 

473-3     47,400                  Trans.  35,400 

507-1     47,200                  Trans.  35,400 

473-1     41,900                  Trans.  32,900 

31-1     41,200                  Trans.  25,800 

610         36,500                  Trans.  32,800 

572-2     36,100                  Trans.  38,000 

451         33,500                  Trans.  21,000 

572-3     31,300                  Trans.  37,200 

701-4     26,800*                Trans.  37,600* 

70-1     26,300**              Trans.  38,200 

707-2     22,900                  Trans.  26,000 

707-1     20,600                  Trans.  28,000 

701-3     17,200***            Trans.  25,600 

70-1     14,400**              Trans.  25,700 

707-1     14,000                   Horiz.  19,400 

507-6     11,500                   Horiz.  27,000 

582         11,400                   Horiz.  17,800 

1005         10,900                   Horiz.  19,800 

1007         10,900                   Horiz.  19,800 

473-6     0  Horiz. 

86        0                    Horiz.  &t  31,900 

Vert.-Longt  55,900 

473-6     0                       Horiz.  23,800 

507-3     36,500          Comp'n  Horiz.  30,400 

34,300           Comp'n  Horiz.  23,600 

43         47,000          Comp'n  Diag.  27,600 

42,100          Comp'n  Horiz.  19,600 

*  Did  not  rupture  at  theoretical  critical  section;  fissure  located  by  subsequent  slicing  and  etching; 
depth  to  nucleus  not  precisely  known. 

**  Did  not  rupture  at  theoretical  critical  section;  fissure  located  by  subsequent  slicing  and  etching; 
diameter  of  nucleus  of  fissure,   0.5   in. 

**•  One  of  six  transverse  fissures  in  two  inches  of  rail. 

t  Tensile  stress   normal   to  horizontal   plane. 

t  Shearing  stress  in  one  direction  of  fracture  42,100  lb.  per  sq.  in.,  and  tensile  stress  normal  to 
vertical-longitudinal  plane   (another  direction  of  fracture)    16,900  lb.  per  sq.  in. 


In  laboratory  tests  of  rails  in  the  rolling-load  machines  internal  fissures  have  been 
developed  under  the  wheel  load  at  sections  where  bending  moment  was  very  small,  but 
never,  even  in  shatter-cracked  rails,  at  sections  of  heavy  bending  moment  outside  the 
path  of  the  wheel  load.  Hence  it  seems  clear  that  the  stress  under  the  wheel  load  on  the 
rail  is  a  factor  of  prime  importance.  Table  1  shows  typical  results  of  rolling-load  tests. 

9.  Harmony  of  Test  Results. — From  tests  of  specimens  of  rail  steel  (See  Chap- 
ter VII)  the  endurance  limit  of  rail  steel  under  cycles  of  shearing  stress  varying  from 
zero  to  a  maximum  ranges  from  50,000  to  65,000  lb.  per  sq.  in.,  using  polished  specimens. 
If  a  series  of  specimens  is  tested  in  which  a  small  fatigue  crack  has  been  started  the 
endurance  limit  is  reduced  from  40  to  50  percent.  Figure  5  shows  results  from  rolling- 
load  tests.  It  will  be  noted  that  all  but  one  of  the  specimens  in  which  internal  fissures 
were  developed  were  subjected  to  theoretical  shearing  stresses  which,  if  repeated,  would 


690 


Investigation    of    Fissures   in    Railroad    Rails 


|Og  70000 

°^»  60000 

o     ui 

*  '^  <«  Knnnn 


3hS  «40000 


M4 

_l(0  >C 
<  >£  o 


u  a:  u  ' 
*  ~  *  ' 

—  Q£  bj 
111 -^  (O 

<Ib 
|3i 

K  X 


rr^y777/777X777Y77777/777777 

RANGE. OF  ENOURANCEaiMIT'<: 

^UNOER    REPEAtEO   ShEAR,^ 

UNCRACKED   RAIL  STEEL 


^ANGE  6f  ENbURANCE^LifttirUNDER 

><^i>-^zi^EPEATE6xSHEAft  ;<RA'|L% 
"■  ''^  feTEEL  WitH  SMALL  CRACK 


NOMINAL  FLEXURAL  STRESS  AT  SECTION   WHERE  FAILURE   OCCURRED 
LB    PER  SO    IN 


•  FATIGUE   FAILURES  (116  SPECIMENS) 
STARTING  AT  SURFACE     NO  SHATTER 
CRACKS  SHOWN  IN  ETCH  TEST 

o      FATIGUE   FAILURES   (30  SPECIMENS) 
STARTING  AT  SURFACE     SHATTER 
CRACKS    SHOWN    IN    ETCH    TEST 

•  FAILURES  (24  SPECIMENS)  STARTING 
AT  INTERNAL  FISSURES  SHATTER 
CRACKS    SHOWN  IN   ETCH    TEST 


t       SPECIMEN    DID    NOT    FAIL    DURING 
TEST    (29    SPECIMENS) 


FIGURES   AT  A  PLOTTED   POINT 
INDICATE    THE   NUMBER   OF 
SPECIMENS    TESTED  AT    THAT 
COMBINATION    OF  SHEARING 
AND    BENDING    STRESS 


Fig.  5. — Results  of  Rolling-Load  Tests  of  Rail  Specimens. 


cause  failure  in  a  specimen  in  which  there  was  a  small  crack.  It  will  be  noted  that  about 
80  percent  of  the  specimens  which  had  shatter  cracks  and  which  failed  from  cracks 
starting  at  the  surface  had  theoretical  shearing  stresses  below  the  range  which  might  be 
expected  to  cause  cracked  specimens  to  fail. 

It  will  be  noted  that  specimens  without  shatter  cracks  which  failed  from  fatigue 
cracks  starting  at  the  surface  had  computed  fiexural  stresses  above  those  required  to 
develop  failure  in  cracked  fatigue  specimens  but,  with  two  exceptions,  within  or  below 
the  range  of  endurance  limit  under  repeated  shear  for  uncracked  specimens.  It  was  im- 
possible within  the  capacity  of  the  rolling-load  machines  to  develop  fatigue  failures  in 
full-size  heavy  rail  free  from  shatter  cracks.  In  this  case  the  section  of  the  rail  was 
artificially  weakened  in  such  a  manner  that  no  metal  was  removed  from  the  shatter-crack 
zone,  but  the  section  modulus  of  the  rail  for  resisting  flexure  was  distinctly  lessened.  In 
the  rolling-load  tests  in  a  shatter-cracked  rail  fissures  have  been  developed  by  wheel  loads 
as  low  as  40,000  lb.  By  the  theory  of  elasticity  this  load  would  develop  a  shearing  stress 
in  the  shatter-cracked  zone  of  the  rail  head  of  about  25,000  lb.  per  sq.  in.  at  a  point 
y%  in.  below  the  tread  of  the  rail.  This  would  be  just  about  the  lower  limit  of  the  range 
of  endurance  limit  for  cracked  specimens. 


Investigation    of    Fissures   in    Railroad    Rails 691^ 

In  Section  16  it  will  be  noted  that  wheel  loads  of  40,000  lb.  occasionally  occur 
under  wheel  loads  in  the  test  tracks  studied  in  this  investigation. 

The  results  of  the  roHing-load  tests  give  grounds  for  the  following  general 
conclusions: 

1.  Shatter  cracks  in  the  heads  of  rails  are  certainly  a  major  and  probably  the 
major  cause  of  fissures  in  the  rail.  Transverse  fissures,  vertical  split  heads  and  horizontal 
split  heads — all  have  been  developed  under  the  rolling-load  test. 

2.  During  the  progress  of  the  rolling-load  tests  for  developing  fissures,  the  lowest 
wheel  load  which  caused  a  shatter  crack  to  spread  into  a  fissure  was  40,000  lb.  This 
value  has,  therefore,  been  taken  as  a  limiting  load,  below  which  fissures  probably  will 
not  develop  even  though  lower  loads  may  be  repeated  several  millions  of  times. 

3.  The  minimum  load  which  caused  fissures  in  the  rolling-load  tests,  the  stresses 
set  up  in  the  rail  head  at  the  shatter-cracked  zone  by  that  load,  and  the  results  of  tests 
of  cracked  fatigue  specimens  of  rail  steel  form  a  harmonious  picture  of  the  mechanism 
of  the  development  of  the  transverse  fissure. 

10.  Transverse  Fissures  and  Shatter  Cracks  in  Service. — During  the  course 
of  the  investigation  some  ISO  rails  have  been  received  in  which  transverse  fissures  in 
service  have  been  developed.  Approximately  87  percent  of  these  when  examined  and  etch 
tested  were  found  to  contain  shatter  cracks.  Some  of  the  others  were  found  to  contain 
large  inclusions  of  oxide  from  which  the  fissure  started.  In  some  of  them  transverse  fis- 
sures seem  to  start  from  slag  streaks  but  in  the  laboratory  so  far  no  fissures  have  been 
developed  from  slag  streaks  unless  etch  tests  showed  shatter  cracks  around  them.  The 
service  records  confirm  in  a  general  way  the  findings  of  the  laboratory  tests  that  shatter 
cracks  are  the  major  cause  of  the  development  of  fissures.  However,  they  indicate,  as 
might  be  expected,  that  in  the  unusual  case  of  a  large  oxide  inclusion  located  in  the  zone 
in  which  shatter  cracks  occur  in  a  rail  a  fissure  may  develop  if  it  is  subjected  to  heavy 
wheel  load. 

11.  Effect  of  Flexural  Stress  on  Growth  of  Fissures. — Both  the  mathematical 
theory  of  stresses  in  rail  heads  and  the  results  of  rolling-load  tests  agree  in  indicating 
that  the  start  of  a  destructive  fissure  is  due  to  the  direct  action  of  the  wheel  load  rather 
than  to  the  flexural  stress.  The  mathematical  analysis  of  stresses  due  to  this  direct  action 
of  wheel  load,  which  is  shown  to  agree  very  well  with  rolling-load  test  results,  indicates 
that  the  stresses  set  up  are  practically  independent  of  the  size  of  rail.  Hence,  it  seems 
that  the  starting  of  fissures  would  not  be  hindered  by  the  use  of  heavier  rails,  except 
insofar  as  they  might  make  track  conditions  smoother  and  reduce  the  "dynamic  aug- 
ment" of  wheel  loads.  They  could  not  be  expected  to  reduce  the  wheel  loads  due  to  flat 
spots  on  wheels.  The  etch  tests  made  indicated  that  shatter  cracks  were  more  frequently 
found  in  heavy  rails  than  in  light  rails. 

However,  an  examination  of  Table  1  indicates  that  the  relative  magnitude  of  wheel 
load  and  of  bending  stress  in  the  rail  is  a  large  factor  in  determining  the  direction  of  the 
fissure.  A  heavy  bending  stress  tends  to  cause  a  fissure  to  spread  in  a  transverse  direction, 
while  a  heavy  wheel  load  accompanied  by  light  bending  stress  tends  to  cause  a  hori- 
zontal split  head.  That  is,  the  use  of  a  heavier  rail  which  would  diminish  flexural  stress 
might  tend  to  reduce  the  number  of  transverse  fissures  as  compared  with  horizontal 
fissures.  Also,  the  rolling-load  tests  give  some  evidence  that  flexural  stresses  accelerate  the 
spread  of  shatter  cracks  into  fissures,  once  these  fissures  have  been  started  by  the  action 
of  wheel  loads. 


692 Investigation    of    Fissures    in    Railroad    Rails 

III  Field  Tests  For  Wheel  Loads 
By  H.  R.  Thomas 

12.  Object  of  Tests. — As  a  result  of  the  rolling-load  tests  in  the  laboratory  it  was 
found  that  the  minimum  wheel  load  which  would  cause  a  shatter  crack  to  grow  in  size 
and  become  a  transverse  fissure  was  approximately  40,000  lb.  This  wheel  load  was  some- 
what higher  than  the  usual  locomotive  driver  load,  and  much  higher  than  the  wheel 
loads  for  heavily  loaded  freight  cars.  Since  it  seemed  probable  that  transverse  fissures 
were  the  result  of  the  application  of  a  relatively  large  number  of  wheel  loads  (more  than 
could  be  expected  from  the  number  of  driver  loads  passing  over  the  rail)  it  was  felt 
that  tests  should  be  made  in  order  to  answer  the  following  questions: 

1.  Do  heavily  loaded  freight  cars  have  occasional  wheel  loads  equal  to  or 
greater  than  the  40,000  lb.  mentioned  in  Section  9? 

2.  If  high  wheel  loads  are  found  under  freight  traffic,  how  frequently  do 
these  occur? 

3.  If  high  wheel  loads  are  found,  what  is  the  reason  for  their  occurrence? 

13.  Test  Methods  and  Apparatus. — In  order  to  accumulate  the  necessary  sta- 
tistical data  concerning  the  magnitude  and  frequency  of  high  wheel  loads,  it  was  decided 
to  base  such  determinations  on  measurements  of  average  longitudinal  strain  at  the  center 
of  the  base  of  the  rail.  Since  such  average  strain  is  very  nearly  proportional  to  the 
wheel  load  causing  the  strain,  the  problem  resolved  itself  into  devising  a  means  for 
recording  the  strain  under  each  locomotive  and  car  wheel  for  the  usual  freight  train 
passing  over  the  test  location. 

It  was  decided  that  the  recently-introduced  DeForest  scratch  strain  recorder  would 
be  the  simplest  method  of  measuring  such  strains,  provided  it  would  give  satisfactory 
records  under  the  severe  impact  and  vibration  conditions  found  in  a  railroad  rail  during 
the  passage  of  a  train.  A  trial  instrument  was  obtained  and  used  on  the  tracks  of  a  local 
railroad  in  order  to  try  it  out.  It  was  found  that  by  making  some  modifications  in  the 
instrument  and  by  introducing  rubber  padding  for  damping  vibration  of  certain  parts, 
satisfactory  records  could  be  obtained.  Ten  of  these  instruments  were  purchased  and 
mounted  on  clamps  which  could  be  attached  to  the  base  of  the  rail  at  points  where 
measurements  were  desired.  Figure  6  shows  this  strain  gage  and  its  attachment  to  the  rail. 

The  principle  of  operation  of  the  scratch  strain  gages  is  very  simple:  The  total  strain 
in  the  rail  in  the  four-inch  gage  length  is  recorded,  without  magnification,  by  a  diamond 
point  scratching  on  a  chromium-plated  brass  strip.  Movement  of  the  strip,  producing  a 
separation  of  the  ordinates  corresponding  to  the  passage  of  the  various  wheel  loads  over 
the  instrument,  is  produced  by  a  spring  whose  action  is  influenced  by  the  variable 
friction  introduced  by  the  relative  movement  of  the  two  ends  of  the  instrument  due  to 
the  strain  being  recorded.  The  rate  of  feed  can  be  controlled  by  variation  of  spring 
tension  and  of  the  friction  acting  on  the  plate  carrying  the  record  strip.  With  proper 
regulation  of  friction  and  spring  action  it  was  possible  to  obtain  records  showing  the 
strain  in  the  rail  for  each  wheel  of  a  40-car  train. 

This  original  form  of  the  scratch  strain  gage  was  used  for  the  tests  made  at  Dayton, 
Ohio,  and  at  Coatesville,  Pa.  After  the  completion  of  these  latter  tests,  ten  new  instru- 
ments were  built  in  the  University  shops,  embodying  the  general  principles  of  operation 
of  the  original  instruments,  but  including  certain  changes  which  made  them  more  suit- 
able for  the  tests  of  wheel  loads  in  service.  The  changes  made  included:  (1)  More  rigid 
construction  to  prevent  vibration;   (2)  use  of  celluloid  pads  coated  with  diamond  dust 


Investigation    of    Fissures   in    Railroad    Ra ils 


693 


©-   CLAMP 

(D-   STEADYING  SCREW 
(D-    DIAMOND   ARM 
(5-    ADJUSTING  SCREW 
d)-   FRICTION  PLATE 
©-   RUBBER  PADDING 
@-  DIAMOND  PAD 

t  TARGET-CLAMPING  ECCENTRIC 
TARGET  CARRIER 
©-  FEED  SPRING 
@-  TARGET 


Fig.  6. — Scratch  Strain  Recorder. 
This  instrument  measured  the  strain  in  the  base  of  a  rail  for  every  wheel  load  which  passed  over  it. 
From  this  strain  and  the  measured  stiffness  of   the  track   the  wheel   load  accompanying  each   indicated 
strain  was  computed.  This  instrument  is  an  adaptation  of  the  DeForest  scratch  extensometer,  and  was 
used  with  Dr.  DeForest's  permission. 


instead  of  the  single  diamond  recording  point;  (3)  strictly  interchangeable  parts  with 
spare  parts  available  for  substitution  in  case  of  necessity.  In  most  cases  parts  were 
replaceable  without  removing  the  instrument  from  the  rail. 

These  ten  revised  instruments  were  used  on  the  tests  at  Rome,  N.  Y.  After  the 
tests  at  Rome,  10  additional  instruments  were  made,  and  all  20  were  used  in  the  tests  at 
Matfield  Green,  Kans. 

14.  Interpretation  of  Results. — In  order  to  determine  wheel  loads  from  the 
measurements  of  mean  strain  in  the  base  of  the  rail,  use  was  made  of  the  mathematical 
analyses  reported  by  Professor  A.  N.  Talbot  in  the  Sixth  Progress  Report  of  the  Special 
Committee  on  Stresses  in  Railroad  Track.*  Considering  a  group  of  four  adjacent  freight 
car  wheels,  the  bending  moment  under  a  given  wheel  may  be  reduced  by  the  effect  of 
adjacent  wheels,  but  if  there  is  a  dynamic  augment  in  a  given  wheel  load  (due,  for 
example,  to  a  flat  wheel)  then  the  increase  in  bending  moment  at  that  wheel  will  be  very 
nearly  proportional  to  the  increase  in  wheel  load.  Since  the  measurements  of  strain  in  the 
base  of  the  rail  permitted  calculations  of  corresponding  bending  moments,  the  above 
relationship  was  used  for  computing  the  dynamic  increase  in  wheel  load.  Bending 
moments  due  to  static  wheel  loads  were  determined  from  runs  over  the  instruments  at 
sufficiently  slow  speeds  (5  miles  per  hour)  to  avoid  dynamic  effects  for  cars  with  wheels 
in  good  condition. 


«See  AREA  Proceedings,  Vol.  35,  1934,  p.  278. 


694 


Investigation    of    Fissures    in    Railroad   Rails 


IS.  Results  of  Tests. — Over  a  period  of  three  years,  tests  for  frequency  of  high 
wheel  loads  for  freight  cars  were  made  as  follows: 

September-October  1Q33.— On  the  B.  &  O.  north  of  Dayton,  Ohio,  on  the  130-lb. 
test  rail  laid  in  1932.  Tests  were  made  at  two  locations,  one  being  near  the  beginning  of 
the  test  rail  at  North  Dayton,  and  the  other  near  the  north  end  of  the  test  rail  at  Van- 
dalia.  On  this  single  track  line  a  considerable  percentage  of  the  traffic  consisted  of  loaded 
coal  and  ore  cars,  with  some  refrigerator  and  box  cars. 

February  1934. — A  few  tests  were  made  using  a  special  train  containing  cars  with 
flat,  badly  worn,  and  shelled  wheels.  Effect  of  frozen  railbed  was  also  studied  in  these 
tests. 

September  1934. — Tests  were  made  on  the  eastbound  freight  track  on  the  main  line 
of  the  Pennsylvania  Railroad  west  of  Coatesville,  Pa.  These  tests  were  on  lS2-lb.  rail. 
Traffic  consisted  largely  of  loaded  coal  cars. 

July  1935. — Tests  were  made  on  the  New  York  Central  Railroad  near  Rome,  N.  Y. 
at  three  locations:  1.  Near  Greenway,  on  105-lb.  Dudley  rail,  the  track  being  in  rather 
poor  condition.  2.  East  of  Rome  on  127-lb.  Dudley  rail.  3.  On  105-lb.  rail  on  a  steel 
bridge  east  of  Rome.  This  rail  on  the  bridge  was  laid  with  GEO  construction,  the  ties 
being  supported  directly  on  the  bridge  stringers.  The  test  was  for  the  purpose  of  deter- 
mining the  effect   on  dynamic   wheel  loads  of   very   rigid   rail  support   rather   than   for 


10  0 

i*!-     ■ 

•^^ 

' 

\  ^ 

\            ^^ 

W 

r^^\ 

\ 

^ 

^^^-- 

BSO    TESTS.  DAYTON,  0 
AV    130  a  100   LB   RAIL 

NYC     TESTS,  ROME,  NY 

127    LB    RAIL 
PRR     TESTS.  COATES- 
VILLE   PA    152  LB    RAIL 
•SANTA   FE    TESTS  MATFIELD 
GREEN,   KAN     110  LB    RAIL 

\ 

V 

"^ 

^-^^ 

10 

\ 

\ 

\ 

\ 

\\ 

"^^ 

\ 

\\ 

\ 

V              \ 

1 

\\ 

-^ 

01 

V 

\ 

\\ 

^ 

\  \^ 

^^ 

\ 

\.     \ 

\ 

\^ 

OOi 

1            "^ 

\ 
\ 

^ 

t. 

V 

\ 

^^ 

V 

\ 

N,^ 

nK> 

^^^ 

N 

> 

^ 

0  001 

15000         25000         35000       45000       55000        65000        75000    -  LB 


WHEEL     LOADS     EQUAL     TO    OR    GREATER    THAN 
VALUES     INDICATED 

Fig.  7. — Frequency  of  High  Wheel  Loads 
at  Four  Test  Locations, 


Investigation    of    Fissures   in    Railroad    Rails 


695 


0  001 


75000    -    LB 


WHEEL   LOADS   EQUAL  TO,  OR  GREATER   THAN   VALUES    INDICATED 

Fig.  8. — Frequency  of  High  Wheel  Loads  at  Sections  of  Track  with 
Different  Stiffness  of  Rail  Support. 

determining  impact  loads  on  a  bridge.  A  few  instruments  were  placed  near  the  bridge, 
also  on  GEO  track,  for  comparison. 

Traffic  over  these  test  sections  was  mostly  mixed  freight,  including  refrigerator  cars 
with  some  coal  cars. 

May-June  1936. — Tests  were  made  on  the  110-lb.  test  rail  laid  on  the  Atchison, 
Topeka  &  Santa  Fe  near  Matfield  Green,  Kans.  This  is  a  single-track  freight  cut-off 
carrying  mixed  freight  with  many  refrigerator  cars  and  oil  tanks.  Tests  were  made  using 
20  instruments  at  two  locations:  (1)  On  normal  tangent  track;  (2)  on  a  ballasted  deck, 
timber,  pile-supported  trestle.  The  bridge,  in  general,  differed  little  in  stiffness  from  the 
normal  track. 

In  Figures  7  and  8  there  are  presented  load-frequency  curves,  giving  the  results  of 
tests  on  the  four  railroads.  It  will  be  noted  that  in  Fig.  7  the  curves  for  tests  on  the 
Baltimore  &  Ohio  and  the  Pennsylvania  railroads  show  good  agreement,  while  the  curves 
for  the  tests  on  the  New  York  Central  and  the  Atchison,  Topeka  &  Santa  Fe  Railroads 


696 Investigation    of    Fissures    in    Railroad   Rails 

are  about  10,000  lb.  lower  than  the  others.  A  study  of  the  train  sheets  indicated  that 
there  was  approximately  a  10,000-lb.  difference  in  the  average  wheel  load  for  the  loaded 
cars  for  these  two  groups  of  curves. 

In  Fig.  8  the  curves  for  tests  on  the  bridges  on  the  New  York  Central  and  the 
Santa  Fe  are  shown,  the  curves  for  tests  on  the  same  roads  at  sections  not  on  the 
bridges  being  given  for  comparison.  It  will  be  noted  that  for  the  tests  on  the  Santa  Fe 
the  curve  for  the  bridge  tests  is  not  greatly  different  from  that  for  track  away  from  the 
bridge.  This  is  to  be  expected,  since  this  ballasted-deck  bridge  was  of  approximately  the 
same  stiffness  as  the  regular  track.  The  higher  wheel  loads  indicated  by  the  curve  for  the 
bridge  on  the  New  York  Central  were  undoubtedly  due  to  the  fact  that  the  ties  were 
supported  directly  on  the  bridge  stringers,  which  resulted  in  a  very  stiff  track  support. 

16.  Conclusions. — Based  on  a  study  of  the  results  obtained  on  the  above  tests, 
including  a  study  of  many  details  not  given  by  the  load-frequency  curves  of  Figures  7 
and  8,  but  on  file  at  the  Talbot  laboratory,  the  following  statements  appear  justified: 

1.  Under  heavily  loaded  freight  cars  (coal,  ore,  etc.),  wheel  loads  equal  to  or 
greater  than  40,000  lb.  occurred  on  an  average  in  these  tests  once  for  each  1,000 
wheel  loads  passing  over  a  given  point  in  the  rail.^  At  some  points  along  the  rail, 
the  frequency  of  40,000-lb.  wheel  loads  was  three  times  as  great  as  the  average. 

2.  For  less  heavily  loaded  cars  the  frequency  of  40,000-Ib.  wheel  loads  was 
less  than  for  the  heavier  loads. 

3.  High  dynamic  wheel  loads  may  be  caused  by  flat  spots  on  wheels,  out-of- 
round  wheels,  lack  of  concentricity  of  axle  and  rim  of  wheel,  and  non-uniformity 
of  rail  support. 

4.  From  these  field  tests  it  seems  that  in  the  speed  ranges  of  trains  below 
25  m.p.h.,  flat  spots  on  wheels  are  very  prominent  as  a  cause  of  high  wheel  loads. 
In  the  range  of  40  to  50  m.p.h.,  hard  spots  in  the  rail  support  seem  prominent, 
and  in  the  range  of  60  m.p.h.  and  above  out-of-round  wheels,  unbalance  in 
counterweights  and  abnormally  large  play  between  rail  and  tie  (that  is,  lack  of 
uniformity  of  rail  support)  loom  up  as  important  factors.  These  speed  ranges 
probably  will  not  be  the  same  for  locomotive  drivers  as  for  freight  car  wheels,  but 
adequate  data  on  which  to  base  a  quantitative  statement  are  not  available  at 
this  time. 

IV  Service  Records  of  Test  Rails 
By  J.  L.  BiSESi 

17.  Test  Rails  on  the  Baltimore  &  Ohio  and  Santa  Fe. — Early  in  the  investi- 
gation of  transverse  fissures  in  railroad  rails,  two  railroads  agreed  to  put  in  test  sections 
of  rails  to  be  observed  for  the  purpose  of  determining  some  facts  regarding  the  forma- 
tion of  transverse  fissures  under  service  conditions.  They  were  all  hot-bed  cooled  rails. 


^  Tests  of  the  ratio  of  flexural  strain  to  flexural  load  were  made  by  Dr.  R.  N.  Arnold  in  the  Talbot 
laboratory,  University  of  Illinois.  He  applied  load  rapidly  by  means  of  a  weight  falling  from  various 
heights  and  striking  at  raid-span  a  rail  supported  head  up  as  a  simple  beam.  To  the  tension  side  (base) 
were  soldered  a  series  of  DeForest  scratch  strain  gages  which  gave  a  record  of  strain  variation  along  the 
base.  From  this  the  load  applied  could  be  determined  with  a  fair  degree  of  accuracy.  The  ratio  of  load 
to  maximum  base  stress  was  found  to  be  higher — in  some  cases  100  percent  or  more  higher — than  the 
ratio  of  load  to  base  stress  under  static  load.  This  was  due  to  the  resistance  to  sudden  bending  offered 
by  the  inertia  of  the  rail. 

This  result  indicates  that,  since  the  curves  shown  in  Figures  7  and  8  were  determined  on  the  basis 
of  ratio  of  load  to  base  stress  as  given  by  analysis  for  a  static  load,  the  wheel  loads  shown  in  those 
figures  may  be  somewhat  too  low.  However,  the  rapidity  of  load  application  to  a  rail  resting  on  ties 
and  ballast  is  probably  considerably  less  than  is  the  case  with  Dr.  Arnold's  stiffly  supported  test  beam. 


Investigation    of    Fissures   in    Railroad    Rails 697 

The  rails  were  to  be  rolled  under  normal  conditions  under  specifications  of  the  individual 
railroads  and  to  be  placed  in  average  service  with  no  special  care  or  maintenance.  Repre- 
sentatives of  the  test  party  were  present  at  the  time  of  rolling  and  laying  and  also  each 
time  that  Sperry  car  tests  were  made  on  the  rails  in  service.  The  rails  were  rolled  in 
1931  and  1932  by  five  mills  as  listed  below. 

Mill                                                                              130-lb.  Rails                    110-lb.  Rails 

Summer  Winter  Summer  Winter 

Rolling  Rolling  Rolling  Rolling 

A  6  heats  7  heats 

B   8  heats  7  heats 

C  10  heats  11  heats 

D  7  heats  7  heats  6  heats  6  heats 

E   6  heats  6  heats  6  heats  6  heats 

The  roads  which  participated  in  the  tests  were  the  Baltimore  &  Ohio  and  the  Atchi- 
son, Topeka  &  Santa  Fe.  At  the  test  locations,  the  traffic  on  the  former  is  heavy  as  com- 
pared with  that  on  the  latter,  the  one  moving  more  coal,  ore,  and  machinery  and  the 
other  more  oil  and  refrigerator  car  traffic.  The  track  of  the  Baltimore  &  Ohio  has  more 
grades  and  curves  than  that  of  the  Santa  Fe. 

18.  Tests  of  B.  &  O.  Rails.— The  130-lb.  rails  rolled  for  the  Baltimore  &  Ohio 
were  installed  in  track,  beginning  in  1932,  and  the  last  test  rails  were  placed  in  service  in 
1936.  The  test  rails  were  distributed  over  the  system  and  laid  in  seven  location^  as  follows: 

Toledo  Division — North  Dayton  to  Vandalia:   1,529  rails  laid  in  February  1932 
on  single  track.  Mile  Post  62.5  to  68.1. 
Tippecanoe  City  to  Troy,  Mile  Post  72.9  to  78.1, 
1,514  rails  laid  between  May  1934  and  March  1936. 

Pittsburgh  Division — Layton  to  St.  James,  1,108  rails  laid  December  1933  on  westbound 
track. 

Cumberland  Division^ — Bardane  to  Kearneysville:  371  rails  laid  July  1933  on  Track  2. 
Kesslers  Bridge  to  Okonoko:   1,625  rails  laid  August  1933  on  Track  3. 
Hansrote:   51  rails  laid  July  1933  on  Track  3. 

Patterson  Creek  cut-off:    142  rails  laid  March  1932  on  Track  4.  Service  on 
this  track  was  discontinued  between  May  1932  and  Oct.  1,  1939. 

No  special  order  was  used  in  laying  the  rails  except  that  the  rails  from  each  heat 
were  kept  together.  The  "A"  rails  of  the  various  heats,  however,  were  all  laid  at  the 
beginning  and  end  of  the  test  sections. 

In  the  fall  of  1933  a  detailed  study  was  made  of  the  rails  laid  on  the  Toledo  division, 
north  of  Dayton.  For  this  study  a  car  was  constructed  on  which  a  six-volt  generator 
from  the  laboratory  could  be  mounted  and  driven  by  a  propelling  engine.  Cables  attached 
to  the  generator  in  the  car  could  be  run  out  to  the  end  of  the  rails  in  track  and  the 
drop-of-potential  test  run  on  the  full  length  of  the  rail. 

The  drop-of-potential  tests  were  made  on  443  rails  classified  as  follows: 

(1)  111  "A"  rails. 

(2)  96   rails  from  a   heat   containing   a  great   number   of   shatter   cracks.  (Heat 
50110). 

(3)  119  rails  from  a  heat  containing  no  shatter  cracks.  (Heat  21660). 

(4)  95  rails  from  a  heat  representing  summer  rollings,  having  few  shatter  cracks. 
(Heat  30240). 


I 


698 Investigation    of    Fissures   in    Railroad    Rails 

(S)  93  rails  from  a  heat  containing  few  shatter  cracks,  part  of  which  heat  had 
been  in  service  10  months  longer  than  the  other  test  rails.  (Heat  43118). 

No  fissures  were  discovered  in  any  of  the  rails  tested  at  this  time  but  this  was  not 
surprising  since  in  most  cases  few  fissures  develop  in  rails  in  service  during  the  first  few 
years  of  service. 

Beginning  in  1934  the  test  rails  in  service  on  all  sections  on  the  Baltimore  &  Ohio 
were  tested  by  means  of  the  Sperry  detector  car  under  conditions  of  commercial  testing 
in  current  use.  In  most  cases  the  test  rails  were  given  more  attention  than  is  ordinarily 
given  to  the  general  run  of  rails.  This  was  especially  true  during  the  years  1936  to  1939 
when  the  double-crew  method  of  testing  was  used  and  particularly  in  1936  and  1937 
when  the  second,  or  hand-test  car  made  a  drop-of-potential  test  on  each  indication  that 
appeared  on  the  record  tape. 

The  cumulative  record  of  failures  in  the  hot-bed  cooled  test  rails  on  the  Baltimore 
&  Ohio  appears  in  Table  2.  The  failures  found  in  the  Sperry  car  tests  made  in  1940  are 
included.  With  reference  to  this  table  it  will  be  noted  that  although  the  first  failure 
found  in  these  rails  (a  vertical  split  head)  occurred  in  Heat  50110  in  1936,  the  first  trans- 
verse fissure  failures  occurred  almost  simultaneously  in  Heats  SOI  10  and  43118  after  they 
had  carried  a  traffic  of  73  million  tons.  Etch  tests  had  indicated  that  rails  in  these  two 
heats  contained  more  shatter  cracks  than  those  in  other  test  heats.  It  should  be  noted 
that  of  the  14  vertical  and  horizontal  split  heads,  all  occurred  in  shatter-cracked  heats; 
none  in  non-shattered  heats.  The  distribution  by  rail  letter  was  as  follows: 

Rail  Vertical  Horizontal 

Letter                                                                                                  Split  Heads  Split  Heads 

A   2  2 

B   1  0 

C   0  1 

D 2  1 

E   0  2 

F   1  2 

The  evidence  from  the  laboratory  samples  of  the  above  rails  seems  to  indicate  that  a 
majority  of  these  failures  originated  at  slag  or  segregation  streaks,  although  some  of  these 
failures  have  been  found  in  service,  which  gave  clear  evidence  of  having  originated  in 
shatter-cracked  areas. 

No  failures  have  been  reported  in  the  test  sections  on  the  Cumberland  division  at 
Hansrote  (51  rails  in  Track  3)  and  on  the  Patterson  Creek  cut-off  (142  rails  on  Track  4). 

19.  Test  of  Rails  on  the  Santa  Fe. — The  110-lb.  hot-bed  cooled  rails  laid  in  the 
tracks  of  the  Atchison,  Topeka  &  Santa  Fe  were  laid  southwest  of  Emporia,  Kans.  be- 
tween Ellinor  and  Matfield  Green,  in  1932.  This  is  a  single  track  cut-off  which  is  used 
exclusively  for  freight.  In  this  case  these  rails  were  also  laid  by  heats  as  follows: 

Mill                                                                              From                      To  Total 

Letter                                                                     Mile  Post             Mile  Post  Miles      Feet 

E    124+ 2,985  ft.  131 +  3,023  ft.  7+         38 

C    131 +  3,023  ft.  138+ 2,590  ft.  6+    4,847 

D    138 +2,590  ft.  145  4- 2,462  ft.  6+    5,152 

Total   20  +    4,757 

The  test  rails  laid  in  the  tracks  of  the  Santa  Fe  have  also  been  tested  each  year  since 
1934  by  means  of  the  Sperry  type  detector  car  owned  and  operated  by  the  railroad 


Investigation    of    Fissures    in    Railroad    Rails 


699 


{3 


i-lH 


oj©  o  o  o  oj 


r-cvjiH;ooooK> 


CVJ^OOlOOOOO 


ITiCVJ  tH  iH  f-t 


■V>    4>    4*    4> 

i-l   o    «   o   o 


f-t  r^  i-t  »H  >-4 


inCVJ   iH  r-l  O 


O   O  O  O  r-l 


o  o  o  o  o 


o  o  o  o  o 


O  60  OJ  o- 

iH  r-t  mo 

^  r-l  O 

Q  r^if\ 


SiH^   ITNIT 

,cri  o  <-H  r*".  ir 


*»     4  UM-I 

a  i-i  fii  ro 


la  *» 


H 


.H=^-. 


o      o  o  o  o 


O  i-H   (-1  iH 


60   (\J 

cr\o 
r— 1~- 


o  o  <V) 


•     •     • 
M  BO  (TV 


^ 


u 

■H    O 
*»    o 


o  ^ 
rH 

C  r-l 


Ei   O 

OJ  (3 


♦»  » 
3  o 


gfr  3 


(-3  tJ 


.5  5 


•»»  r-l 


5t: 
5i 


o  o 

§9 

Eh  »j 


II 


700 Investigation   of   Fissures   in   Railroad   Rails 

company.  In  this  time  no  fissured  rails  have  been  reported  in  this  test  section.  There  have 
been,  however,  37  rails  removed  for  the  following  reasons: 

4  Crushed  head 
26  Curve  worn 

5  Stock  rail 
2  Kinked 

This  rail  at  the  last  report  (January  9,  1941)  had  carried  118,406,000  tons  of  traffic. 
The  general  conclusions  which  may  be  drawn  from  these  test  rails  are: 

1.  Transverse  fissures  were  generally  associated  with  shatter-cracked  rail. 
This  fact  is  indicated  by  the  fact  that  in  all  cases  where  transverse  fissures  have 
been  found  in  these  test  rails,  the  etch  tests  of  these  rails  and  other  rails  from 
the  same  heat  have  shown  that  shatter  cracks  have  been  present.  Of  the  67 
failures  in  the  test  rail  on  the  B.  &  O.  only  9  failures  have  occurred  in  heats  not 
shattered.  These  9  failures  were  detail  fractures  under  burns. 

2.  It  is  Ukely  that  in  a  given  group  of  rails  in  service  under  similar  track 
conditions  and  traffic,  fissures  will  first  be  found  in  rails  from  heats  which  con- 
tain the  greater  number  of  shatter  cracks.  This  is  shown  by  the  fact  that  in  the 
rails  laid  on  the  Baltimore  &  Ohio  the  first  failures  were  found  in  rails  from  Heats 
50110  and  43118,  the  two  heats  containing  the  most  shatter  cracks,  as  shown  by 
etch  tests  of  specimens.  Also  out  of  the  67  failures  in  these  test  rails,  34  have 
occurred  in  these  two  heats  whereas  the  rest  are  spread  through  IS  other  heats 
not  so  badly  shattered. 

3.  In  order  to  start  a  transverse  fissure  a  rather  large  number  of  heavy  wheel 
loads  is  necessary.  This  was  shown  in  the  laboratory  by  the  fact  that  in  the  rolling- 
load  machines  no  fissures  were  produced  when  wheel  loads  were  kept  below 
40,000  lb.  In  this  connection  it  is  interesting  to  note  that  transverse  fissure  failures 
have  occurred  in  the  rails  of  the  Baltimore  &  Ohio  where  there  are  more  heavy 
wheel  loads  but  not  in  the  rails  in  the  tracks  of  the  Santa  Fe  where  there  were 
fewer  heavy  wheel  loads.  However,  etch  test  results  indicated  that  the  Santa  Fe 
test  rails  were  freer  from  shatter  cracks  than  the  Baltimore  &  Ohio  test  rails. 

20.  Correlation  of  Rolling-Load,  Wheel-Load  and  Service  Tests  on  Rails 
North  of  Dayton. — The  development  of  transverse  fissures  in  the  test  rail  on  the 
Baltimore  &  Ohio  recalls  the  question  of  correlation  of  the  various  test  data.  This  dis- 
cussion is  based  largely  on  the  discussion  of  the  results  of  the  field  tests  to  determine 
wheel  loads  made  north  of  Dayton  in  1933.  A  list  of  some  of  the  failed  rails  found  in 
this  section  of  track  is  given  in  Table  3,  together  with  the  amount  of  traffic  which  these 
rails  have  carried  and  the  dates  the  failures  were  found. 

Heats  47248  and  27S2S  were  laid  in  March  1936  and  October  1935,  respectively, 
after  having  lain  on  the  ground  since  they  were  rolled  in  1932,  therefore,  although  the 
failures  were  found  in  December  1938  they  had  comparatively  little  tonnage  over  them. 

In  the  laboratory,  the  rolling-load  tests  were  carried  out  in  an  attempt  to  give  some 
estimate  of  the  number  and  magnitude  of  wheel  loads  necessary  to  start  and  develop  an 
internal  fissure  in  a  rail.  A  study  of  the  data  shows  that  the  lowest  recorded  load  which 
started  a  fissure  in  the  laboratory  was  40,000  lb.  However,  after  a  fissure  is  started  it 
will  spread  under  a  load  less  than  that  required  to  start  it.  From  a  study  of  rolling-load 
test  results  an  admittedly  crude  estimate  is  that  once  a  fissure  started  to  spread  under 
loads  of  40,000  lb.  or  more,  then  after  200,000  wheel  loads  of  30,000  lb.  or  more  rail 
fracture  might  occur.  From  the  records  of  wheel-load  tests  north  of  Dayton  it  was  con- 


Investigation    of    Fissures   in    Railroad   Rails  701 


T/J)LE  3 


TAILED  130-13,  TEST  RAILS  -  TOLEDO  DIVISION,   NORTH  DAYTON  TO  TROY. 


Heat  No,             Defect                 Tonnage,  Date  Found  Rcmaiks 
Millions 

H^2hS            1  T.F,*                         50  Deer,     1933  Found  by 

27525             2  H.S.H,*                      59  Dec,     193*5  Sperr/ 

50110             1  V.S.H.*                    55,9  May       1936  Detector  Car 

50110             1  T.P.                            73  Nov.     1936  Service 

U311g             1  T.F.  Nov,     1936  Failure 

^^3118             3  T.F.  Found  ty 

50110           3  T.r.                       29«2  Sept,  1937  Sperry 

50110             5  ?.F.  Detector 

_!i311?__._..l_Y.S,H, l'_l:l .!!!:__^5^! Car 


*  T.F,     denotes  transverse  fissure 
H.S.H,     -  horizontal   split  head 

V.S.H.     -  vortical   split  head 

eluded  that  at  the  worst  location  tested  3  percent  of  the  wheel  loads  might  be  30,000  lb. 
or  greater.  Estimating  an  average  wheel  load  of  10  tons,  and  remembering  that  the 
tonnage  passing  is  that  for  two  lines  of  rail,  this  would  mean  the  passage  of  about 
65,000,000  tons  of  traffic  before  there  would  be  great  probability  of  failure  by  transverse 
fissures. 

Again  the  fact  that  this  was  a  very  crude  estimate  must  be  kept  in  mind.  Wheel 
loads  of  40,000  lb.  and  higher  were  measured  on  the  tracks  north  of  Dayton,  and  their 
observed  frequency  would  lead  to  an  estimate  of  15,000  such  loads  under  65,000,000  tons 
of  traffic  at  the  "worst"  location  studied.  This  would  probably  be  an  ample  number  of 
wheel  loads  to  start  a  fissure. 

It  will  be  noted  in  the  tabulation  that  the  first  fissures  to  appear  in  the  test  rail 
were  those  in  Heats  50110  and  43118  which  failed  in  service,  breaking  the  block  signal 
circuit.  These  heats  were  expected  to  show  the  first  failures,  since  they  contained  more 
shatter  cracks  than  any  of  the  other  heats  in  service  at  that  location.  The  failures 
occurred  after  an  estimated  73,000,000  tons  of  traffic  had  passed  over  the  track.  The 
vertical  split  head  in  Heat  50110  was  the  top  rail  in  ingot  1  of  that  heat.  It  was  laid  as 
the  first  rail  leading  to  the  west  passing  track  at  the  Needham  yards  and  failed  after  an 
estimated  traffic  of  59,000,000  tons.  It  is  possible,  however,  that,  due  to  its  location,  it 
actually  carried  more  than  the  estimated  tonnage  and  possibly  was  subjected  to  a  great 
many  more  loads  of  high  magnitude. 

The  failures  in  Heats  47248  and  27525  which  occurred  after  only  50,000,000  and 
59,000,000  tons,  respectively,  were  in  a  location  about  16  miles  from  where  the  wheel- 
load  tests  were  made  and  as  noted  above,  the  rails  were  not  put  into  service  until 
several  years  later  than  the  others. 

Again  the  caution  must  be  repeated  that  the  estimates  for  probable  Ufe  of  shatter- 
cracked  rail  are  very  crude  indeed,  and  actual  tonnage  carried  will  often  vary  widely 
from  those  estimates.  However,  the  comparison  of  estimated  and  observed  tonnage  before 
failure  at  the  Dayton  location  is  interesting. 


702 


Investigation    of    Fissures   in    Railroad   Rails 


V  The  Origin  and  the  Prevention  of  Shatter  Cracks  in  Rails 

By  R.  E.  Cramer 

21.  Occurrence  of  Shatter  Cracks  in  New  Rails.^As  pointed  out  in  Chap- 
ter II,  the  available  evidence  indicates  that  shatter  cracks  are  the  major  cause  of  trans- 
verse fissures  in  rails  in  service,  and  a  cause  of  some  compound  fissures  and  horizontal 
split  heads  (horizontal  fissures).  It  should  be  recognized  that  any  other  internal  "stress 
raisers"  such  as  large  slag  inclusions,  as  shown  in  Fig.  9,  or  blow  holes,  as  shown  in 
Fig.  10,  will,  if  located  in  a  region  of  high  stress  be  equally  effective  in  starting  interior 
progressive  fractures.  As  noted  in  Chapter  II,  no  fissures  were  developed  in  rolling-load 
tests  in  rails  without  shatter  cracks,  although  some  fissures  have  occurred  in  service  in 
rails  which  showed  no  shatter  cracks  in  subsequent  etch  tests.  However,  in  these  rails  it 
is  in  many  cases  possible  that  the  fissure  started  from  a  single  shatter  crack,  and  that 


Fig.  9. — Slag  Inclusions  Which  Caused  a  Transverse  Fissure. 

Upper  side  of   micrograph  shows  the  nucleus  of   the  fissure.  Large  inclusions,  such  as  are  shown   here, 

act  as  stress  raisers,   and   in  an   area  of   high   nominal   stress   may  start   internal    fissures. 

Magnification   SO  X-  No  Etch. 


the  etch  test  specimens  happened  to  be  taken  from  locations  in  the  rail  which  had  no 
shatter  cracks.  It  seems  that  occasionally  a  fissure  may  develop  from  a  slag  streak  in  the 
rail,  although  rolling-load  tests  of  new  rails  which  showed  such  slag  streaks  but  no 
shatter  cracks,  failed  to  develop  fissures. 

As  noted  in  Chapter  II,  the  question  was  raised  in  connection  with  the  early  studies 
of  shatter  cracks  whether  these  cracks  were  actually  present  in  new  rails,  or  whether  they 
were  developed  by  the  etching  process,  or  were  caused  by  the  change  of  strain  in  the  rail 
caused  by  cutting  out  slices  of  rail  for  etch  test.  By  the  use  of  high-magnification  exami- 


Investigation    of    Fissures    in    Railroad    Rails 


703 


Fig.  10. — Blow  Holes  in  Rail  Head  Close  to 
Compound  Fissure. 
This  was  a  "D"  rail  of  Ingot  No.  8  in  a  control- 
cooled  heat.  Many  other  blow  holes  were  found  in 
this  rail  merely  by  sawing.  They  ranged  in  size  from 
that  of  a  pinhead  to  that  of  the  diameter  of  a  lead 
pencil.  A  blow  hole  is  defined  as  "A  hole  produced 
during  the  solidification  of  metal  by  evolved  gas 
which,  in  failing  to  escape,  is  held  in  pwckets."  Such 
stress  raisers  as  blow  holes  may  cause  an  internal 
fissure,  especially  a  horizontal  or  vertical  split  head. 
Specimen  not  etched. 


nation  cracks  were  found  in  unetched  slices  of  rail.  Also  a  piece  of  rail  adjacent  to  one 
in  which  etch  tests  had  shown  shatter  cracks  was  thoroughly  annealed"  so  as  to  relieve  any 
internal  strain.  This  piece  of  rail  was  then  sliced  and  etched,  and  shatter  cracks  were 
found  as  in  the  unannealed  piece.  This  is  evidence  that  there  were  some  actual  shatter 
cracks  in  rail  as  rolled,  although  the  majority  of  rails  rolled  in  American  mills  are  free 
from  shatter  cracks. 

In  the  earlier  studies  of  shatter  cracks  in  rail  few  data  were  obtained  on  the  per- 
centage of  rail  heats  which  developed  shatter  cracks.  At  the  start  of  the  present  investi- 
gation etch  tests  were  made  of  each  of  three  rails  from  99  heats  of  new  test  rails  and 
shatter  cracks  were  found  in  45  percent  of  the  heats  of  130-lb.  rails  and  in  33  percent  of 
the  heats  of  110-lb.  rails.  It  is  to  be  noted  that  all  of  the  first  lot  of  test  rails  were  hot- 


'  C.    B.    Bronson    had   previously    reported   similar    tests.  See    ASTM    Proceedings,    Vol.    19    (1919), 
200-201. 


704 


Investigation    of   Fissures   in    Railroad   Rails 


bed  cooled.  It  is  not  considered  that  these  high  percentages  are  representative  of  rail  pro- 
duction in  1931,  as  each  rolling  was  only  one  day's  production,  and  in  some  cases  all 
heats  rolled  the  same  day  developed  shatter  cracks,  while  on  other  days  no  heats  devel- 
oped shatter  cracks.  It  should  be  further  noted  that  subsequent  rollings  of  rails,  even 
though  hot-bed  cooled,  showed  a  smaller  percentage  of  shatter-cracked  heats. 

22.  Possible  Causes  of  Shatter  Cracks. — It  was  soon  recognized  by  members 
of  the  test  party  that  shatter  cracks  in  railroad  rails  are  the  same  type  of  internal  cracks 
as  flakes  in  forgings  which  have  been  widely  discussed  since  the  first  World  War.  Over 
100  technical  papers  have  been  written  on  the  causes  and  methods  of  preventing  flakes. 


Fig.  11. — Equipment  for  Gas  Analysis  of  Steel  by  the  Vacuum  Fusion  Method. 


A  great  many  different  causes  have  been  suggested  including  the  following  as  listed  by 
Zapffe  and  Sims,^  inclusions  in  the  steel,  refining  operation,  casting  temperature,  speed  of 
casting,  ingot  size,  uphill  or  downhill  casting,  quick  heating  in  the  rolling  mill,  excessive 
draft  on  rolling,  separated  ferrite,  dendrites,  formation  of  martensite,  alloy  content, 
transformation  stresses,  cooling  stresses,  brittle  areas,  and  gas  pressure. 

Several  metallurgists  suggested  that  gas  content  of  the  finished  rail  might  be  a  clue 
to  the  cause  of  shatter  cracks,  so  in  1932  in  conjunction  with  Dr.  G.  F.  Smith  of  the 
Department  of  Chemistry  of  the  University  of  Illinois  the  equipment  shown  in  Fig.  11 
was  set  up,  and  analyses  were  made  of  sound  and  shatter-cracked  rails  for  oxygen, 
hydrogen  and  nitrogen.  It  was  found  that  the  oxygen  and  nitrogen  analyses  were  satis- 
factory, but  the  hydrogen  content  of  the  rails  was  so  low  as  to  be  below  the  accuracy 
of  the  analytical  method.  There  was  no  correlation  between  presence  of  shatter  cracks  in 
the  rails  and  the  oxygen  and  nitrogen  content.  It  is  now  understood  that  there  would  be 
practically  no  hydrogen  left  in  the  rails  two  years  after  they  had  been  rolled,  and  the 
^-in.  diameter  specimens  were  machined  from  the  rails  several  months  before  they  were 
analyzed. 

'Zapffe,  C.  A.  and  Sims,  C.  E.— Hydrogen,  Flakes  and  Shatter  Cracks,  Part  III— Metals  and 
Alloys,  July  1940,  pages  44-51. 


Investigation    of    Fissures    in    Railroad    Rails  70S 

From  1929  onward  steel  mills  in  the  United  States  and  Canada  gave  much  attention 
to  the  problem  of  preventing  shatter  cracks  in  rails.  Control-cooled  rails  were  the  subject 
of  much  study  in  steel  mill  laboratories,  under  service  conditions  and,  of  course,  in  this 
Rails  Investigation.  In  view  of  reports  from  German  laboratories  that  "flakes"  had  been 
caused  in  steel  by  treating  heated  steel  with  hydrogen,  tests  were  made  by  the  author 
of  this  chapter  to  see  whether  shatter  cracks  could  be  produced  in  a  sound  steel  rail  by 
treating  it  with  hydrogen.  A  carbon-pile  furnace  in  the  mechanical  engineering  laboratory 
at  the  University  of  Illinois  was  used  to  heat  six-inch  sections  cut  from  rails  free  from 
shatter  cracks  (as  shown  by  etch  test).  The  specimens  were  held  in  the  furnace  for  27 
hours  at  2,300  deg.  F.  in  an  atmosphere  of  hydrogen  and  then  cooled  in  air.  Typical 
shatter  cracks  were  produced  by  this  treatment. 

23.  Experimental  Study  of  Control  Cooling  to  Prevent  Shatter  Cracks  in 
Rails. — ^The  "flakes"  sometimes  found  in  alloy  steel  had  been  largely  eliminated  by  the 
use  of  control  cooling  of  the  steel.  Shatter  cracks  seem  to  be  the  same  as,  or  at  least 
very  similar  to,  flakes.  Control  cooling  of  rails,  then,  seemed  a  promising  method  for  the 
prevention  of  shatter  cracks  in  rails,  and  experimental  control-cooling  processes  for  rails 
had  been  tried;  and  by  1935  control-cooled  rails  were  in  quite  wide  use  on  Canadian 
railroads.  An  experimental  study  of  control  cooling  was  planned  and  carried  out.  The 
tests  were  made  in  three  rail  mills,  F,  M,  and  D.  Altogether  about  450  rails  and  rail 
specimens  from  some  25  heats  have  been  tested.  In  these  tests  groups  of  rail  specimens 
were  cooled  in  special  individual  cooling  boxes,  using  four  different  cooling  procedures, 
as  follows: 

1.  Specimens  cooled  in  air  on  the  mill  floor  to  serve  as  "control"  specimens. 

2.  Specimens  placed  in  cooling  boxes  at  the  same  temperature  and  removed  at 
different  temperatures. 

3.  Specimens  placed  in  cooling  boxes  at  the  same  temperature  and  removed 
after  a  fixed  time  in  the  box,  the  rate  of  cooling  for  different  specimens  being 
varied  by  the  amount  of  insulation  used. 

4.  Specimens  placed  in  cooling  boxes  at  various  temperatures  and  removed 
after  a  fixed  time. 

In  these  tests  each  rail  specimen  was  placed  in  a  wooden  box  about  18  in.  square  by 
3  ft.  long.  This  box  was  insulated  with  rock  wool,  and  the  rate  of  cooling  could  be 
regulated  by  the  amount  of  insulation  used.  In  this  box  the  rate  of  cooling  was  slightly 
faster  during  the  first  hour  than  was  found  to  be  the  case  in  commercial  control-cooling 
containers;  this  was  due  to  the  absorption  of  heat  by  the  rock  wool  immediately  sur- 
rounding the  rail.  However,  this  placed  the  experiments  on  the  safe  side  when  interpreting 
results.  Twelve  such  boxes  were  used  in  a  series  of  tests.  A  thermocouple  was  attached  to 
each  rail  specimen  as  it  came  from  the  hot  saw,  and  the  temperature  observed  until  the 
rail  specimen  was  placed  in  a  cooling  box.  When  a  specimen  was  placed  in  a  cooling  box, 
the  first  thermocouple  was  removed  and  another  thermocouple  clamped  to  the  specimen 
with  a  connection  to  a  12-point  recording  pyrometer  which  recorded  the  time  and 
temperature  while  the  specimen  was  in  the  cooling  box. 

The  rail  specimens  used  for  these  tests  were  full-section  pieces  of  rail  about  two  feet 
long.  This  length  was  chosen  after  a  mathematical  study  of  heat  transfer  in  rails  had 
been  made  by  Professor  W.  L.  Schwalbe  of  the  University  of  Illinois,  who  showed  that 
any  "end  effects"  on  the  temperature  gradient  became  inappreciable  at  a  distance  from 
the  end  of  a  specimen  equal  to  the  height  of  the  rail.  At  least  one  of  the  two-foot  rail 
specimens  from  each  heat  was  cooled  in  air  as  a  control  specimen.  Cooling  in  air  is  a 
little  more  rapid  th^n  is  cooling  on  a  hot  bed  with  other  hot  rails  near  at  hand. 


706 


Investigation    of    Fissures   in    Railroad   Rails 


Fig.  12. — Typical  Etch  Test  of  an  Air-Cooled,  Hydrogen-Treated  Rail  Specimen. 

Etch,  50  percent  hot  hydrochloric  acid.  This  specimen  showed  92  longitudinal  and  62  transverse 
shatter  cracks  on  one  side  of  a  6-in.  horizontal  slice  cut  from  the  head  of  the  rail.  It  will  be  noted  that 
this  etch  test  specimen  showed  many  more  shatter  cracks  than  are  shown  in  Fig.  1  (b),  which  is  a 
macrograph  of  an  etch-test  slice  from  a  normally-produced,  hot-bed-cooled  rail.  Some  hydrogen-treated, 
air-cooled  specimens  showed  many  more  cracks  than  are  shown  in  this  Fig.    12. 


After  the  rail  specimens  had  cooled  they  were  shipped  to  the  Talbot  laboratory, 
horizontal  slices  were  cut  from  the  head  of  each  specimen,  and  deep  etch  tests  made 
with  hot  hydrochloric  acid.  The  etch  tests  of  the  air-cooled  rails  showed  any  shatter 
cracks  present  (See  Fig.  12).  Brinell  tests  were  also  made  on  some  specimens. 

24.  Treating  Ingots  with  Hydrogen  to  Produce  Shatter-Cracked  Rails. — 

In  the  earlier  cooling  tests  it  was  necessary  to  use  specimens  from  a  large  number  of 
heats  of  rail  steel  and  take  the  chance  that  some  heats  would  develop  shatter  cracks  in 
the  air-cooled  or  "control"  specimens.  This  was  a  very  unsatisfactory  procedure,  owing 
to  the  time  and  expense  involved.  The  experiments  with  hydrogen  treatment  of  steel 
(See  Section  22)  suggested  a  way  to  insure  a  supply  of  shatter-cracked  rail  specimens 
for  study.  A  method  of  treating  rail-steel  ingots  with  hydrogen  to  develop  a  large  num- 
ber of  shatter  cracks  was  developed  at  the  Carnegie-Illinois  Steel  Corporation,  Gary,  Ind. 
This  hydrogen  treatment  has  been  applied  to  most  of  the  rails  used  in  the  coohng  tests 
during  the  past  years  and  has  proved  to  be  a  valuable  aid  in  such  experiments,  since  in 
all  cases  when  the  ingots  were  properly  treated  with  hydrogen  the  "control"  specimens 
have  developed  a  large  number  of  shatter  cracks  during  cooling  in  air. 

25.  Method  of  Treating  Ingot  with  Hydrogen. — The  ingot  molds  were  about 
90  in.  high,  holding  about  S  tons  of  steel,  and  in  most  cases  only  one  ingot  from  a  heat  of 
steel  was  treated  with  hydrogen.  The  method  of  introducing  hydrogen  is  shown  in  Fig.  13. 
The  hydrogen  from  the  cylinder  is  bubbled  through  a  bottle  containing  mercury  in  order 
to  know  when  the  gas  is  flowing.  The  rubber  stopper  is  wired  in,  and  the  bottle  tested 
to  over  40  lb.  per  sq.  in.  air  pressure.  For  safety  it  is  partly  buried  in  a  box  containing 
cleaning  waste  or  covered  with  a  wire  screen.  The  bent  J/^-in.  "double  extra  strong"  pipe 


Investigation    of    Fissures    i  n    Railroad    Rails 


707 


Tf^- 


Fig.  13.^ — Method  of  Treating  Ingot  with  Hydrogen. 


extending  nearly  to  the  bottom  of  the  mold  has  a  wall  thickness  of  about  Y^  in.  which 
requires  considerable  time  to  melt  off  as  the  molten  metal  rises  in  the  ingot  mold.  The 
hydrogen  is  hghted  at  the  end  of  the  pipe  before  starting  to  pour  the  ingot  and  to  keep 
the  pipe  open,  a  pressure  of  IS  lb.  per  sq.  in.  is  used  when  the  metal  first  enters  the 
mold.  As  the  metal  rises  in  the  mold,  the  hydrogen  pressure  is  increased  to  keep  an  even 
flow,  as  indicated  by  the  bubbling  of  the  gas  in  the  bottle,  and  the  pipe  is  moved  back 
and  forth  across  the  mold  in  the  molten  steel.  A  maximum  pressure  up  to  about  30  lb. 
per  sq.  in.  is  necessary,  depending  on  how  fast  the  pipe  melts  away.  It  has  been  found 
advisable  to  stop  the  flow  of  hydrogen  when  the  metal  is  about  one  foot  from  the  top 
of  the  mold  to  keep  the  molten  metal  from  spattering  out  of  the  mold.  The  pipe  is 
shortened  by  about  four  feet  when  removed  from  the  mjtal,  depending  on  how  fast  the 
ingot  is  poured.  The  time  of  pouring  has  been  varied  from  two  to  four  minutes  and  this 
also  governed  the  volume  of  hydrogen  used,  the  latter  usually  varying  between  25  and 
40  cu.  ft.  While  freezing,  the  metal  gives  off  considerable  hydrogen  which  burns  at  the 
top  of  the  ingot.  In  the  case  of  one  ingot  the  solid  crust  was  burned  through  with  an 
oxygen  jet  resulting  in  a  J^-in.  stream  of  molten  steel  being  thrown  5  or  6  ft.  high  for 
about  a  half  minute,  showing  that  considerable  internal  pressure  is  developed  as  hydrogen 
and  other  gases  are  liberated  during  the  solidification  of  the  steel. 

The  use  of  hydrogen  treatment  of  rails  in  studying  the  prevention  of  shatter  cracks 
does  not  involve  the  assumption  that  hydrogen  is  the  sole  cause  of  shatter  cracks  in  rails. 
It  does  involve  the  assumption  that  a  control-cooling  process  which  will  prevent  the  very 
severe  shatter  cracking  found  in  air-cooled  hydrogen-treated  rails  will  be  effective  in  pre- 
venting shatter  cracks  in  normally  produced  rails.  This  assumption  appears  not 
unreasonable. 


708 


Investigation   of    Fissures   in    Railroad   Rails 


26.  Results  of  Tests  in  Special  Cooling  Boxes. — Tables  4  and  5  give  the 
results  of  cooling  tests  of  rail  specimens  placed  in  special  individual  cooling  boxes. 
Figure  14  shows  typical  cooling  curves  during  a  test.  An  examination  of  Table  4  shovi^s 
that  shatter  cracks  were  prevented  in  many  of  the  box-cooled  rail  specimens,  and  that 
the  prevention  of  shatter  cracks  is  made  more  probable  by  (1)  placing  the  rail  in  the 
cooling  box  at  as  high  a  temperature  as  is  practicable,  and  (2)  allowing  the  rail  to  remain 
in  the  cooling  box  for  as  long  as  is  practicable.  Naturally  the  longer  the  rail  is  left  in 
the  cooling  box,  the  colder  it  will  be  when  removed;  however,  it  will  be  shown  later 
that  it  is  the  time  in  the  coohng  box  rather  than  the  temperature  of  rail  specimen  at 
removal  which  is  significant  in  the  prevention  of  shatter  cracks. 


0  >  2  3 

TIME  -  HOURS 

Fig.  14. — Typical  Cooling  Curves  for  Rail  Speci- 
men (2  ft.  Long)  in  Individual  Cooling  Box  Insulated 
with  Rock  Wool. 


The  practicable  maximum  temperature  of  the  rail  as  it  is  placed  in  the  cooling 
container  is  set  by  the  tendency  of  the  finished  rail  to  be  soft  if  the  temperature  at 
time  of  placing  in  container  is  too  high.  In  another  series  of  tests,  described  in  Section  30, 
no  appreciable  change  in  hardness  from  that  of  air-cooled  rails  was  found  for  specimens 
held  in  a  furnace  at  900  deg.  F.  for  S  and  6  hours.  Rail  specimens  placed  in  cooling 
boxes  at  1,100  deg.  F.  were  5  to  10  Brinell  numbers  softer  than  air-cooled  specimens. 
Rails  held  in  a  furnace  at  1,100  deg.  F.  were  25  to  30  Brinell  numbers  softer  than  air- 
cooled  specimens:  900  deg.  F.  was  chosen  as  an  upper  temperature  limit  for  placing  rails 
in  cooling  boxes.  The  exigencies  of  rolling  mill  practice  make  it  impracticable  to  get 
every  rail  into  the  cooling  box  at  precisely  900  deg.  F.,  and  for  the  upper  limit  of  a 
temperature  cycle  of  control  cooling  which  should  serve  as  a  criterion  for  judging  the 
effectiveness  of  the  process  in  removing  shatter  cracks,  700  deg.  F.  was  chosen — an  arbi- 
trary value,  but  not  an  unreasonable  one.  It  is,  approximately,  the  lower  limit  permitted 
in  the  present  practice  for  control  cooling  rails. 

For  the  lower  limit  of  the  temperature  cycle  300  deg.  F.  was  chosen.  This  is  also 
an  arbitrary  value  which  was  selected  because  it  was  recognized  in  the  present  specifica- 
tion for  control  cooling  of  rails  which  is  in  rather  general  use  today,  so  the  time  required 
for  the  rail  to  cool  from  700  deg.  F.  to  300  deg.  F.  is  given  in  Table  4. 

An  examination  of  Table  4  shows  that  no  shatter  cracks  were  found  in  any  rail 
specimen  which  was  placed  in  a  cooling  box  at  a  temperature  of  700  deg.  F.  or  higher, 
and  which,  remaining  in  the  box,  required  7  hours  or  more  to  cool  down  to  300  deg.  F. 


Investigation    of    Fissures   in    Railroad    Rails 


709 


TABLE     U, 
TESTS  TOR  SBXnm  CSACKS  IH  HAIL  SP7CV£WS  PLACXD  IN  SPICItL 
COOLIHG  B0X3S  AT  A  TaffERAIUM  OF     700°  FAHS.     OH  HlfflZH, 
Boxes  Insulated  wlUi  roclc  wool*       One  box  for  each  rail  E^eclmen  teated. 


Heat 

SDeclmens 

Time     m 
Box 

Time  to           Shatter  Cracks 
Cool  from         In  &-ln. 

Shattai 
In  6-1 1 

r  Cracks 

Put  m 

HanoTod 

U  of 

Box  at 

from 

700°  ?. 

to 

Stch 

Specimen 

Control 

Specimen 

degrees 

Box  at 
y,  degrees  F, 

hours 

1 

300°  F. 

hoUTB 

i 

Cooled  In  Air 

lOng, 

Trans, 

Long. 

-Trans, 

I. 

,     TESTS  AT  MILL  T  < 

Normally  produced 

Halls 

'• 

(a) 

llS-lb,  rails 

gg 

900 

700 

leas 

than 

1,8 

less 

than 

1.8 

7 

0 

22 

0 

900 

6oo 

N 

N 

3."+ 

n 

II 

5:? 

0 

0 

900 

- 

- 

- 

M 

« 

0 

0 

78 

900 

goo 

less 

than 

1.9 

less 

than 

1.9 

7 

0 

29 

0 

900 

700 

■ 

a 

2.6 

n 

ii 

2.6 

1 

0 

900 

6oo 

II 

" 

5.'4 

" 

n 

s."* 

0 

0 

900 

- 

- 

- 

H 

■ 

3.'^ 

0 

0 

73 

900 

goo 

less 

than 

2.6 

less 

than 

2.6 

0 

0 

15 

0 

900 

700 

■ 

■ 

U.l 

II 

■ 

K\ 

0 

0 

900 

6oo 

II 

R 

i*.5 

H 

H 

^.5 

0 

0 

900 

- 

- 

- 

H 

II 

2.9 

0 

0 

^ 

900 

soo 

less 

than 

?.3 

leE3 

than 

2.3 

8 

0 

22 

1 

900 

700 

" 

R 

3.2 

n 

II 

3.2 

0 

0 

900 

6oo 

n 

H 

5.U 

" 

n 

5.'4 

0 

0 

900 

- 

- 

- 

" 

» 

3.0 

3 

0 

(b) 

130-lb.   rails 

70 

900 

goo 

less 

than 

2.9 

less 

than 

2.9 

1 

0 

16 

0 

900 

700 

" 

n 

3.7 

li 

" 

3.7 

0 

0 

900 

600 

" 

n 

5.5 

" 

" 

5.5 

0 

0 

900 

- 

- 

- 

II 

R 

3.5 

0 

0 

91 

900 

goo 

less 

than 

2.6 

loss 

than 

2.6 

20 

0 

21* 

1 

900 

700 

II 

n 

3.1 

" 

n 

3.1 

9 

0 

900 

600 

" 

" 

5.8 

" 

n 

5.g 

0 

0 

900 

- 

- 

- 

" 

R 

3.'+ 

3 

0 

9i 

900 

goo 

less 

than 

2.8 

less 

than 

2.8 

6 

0 

23 

1 

900 

700 

n 

" 

U.O 

" 

n 

U.o 

0 

0 

900 

600 

" 

" 

7.0 

" 

11 

7.0 

0 

0 

900 

- 

- 

- 

" 

II 

3.7 

1 

0 

69 

900 

800 

less 

than 

2.8 

less 

than 

2.8 

16 

0 

20 

2 

900 

700 

" 

n 

3.2 

H 

" 

3.2 

5 

0 

900 

600 

" 

" 

5.5 

n 

It 

5.5 

0 

0 

900 

- 

- 

- 

II 

" 

3.8 

6 

0 

II.     TESTS  AT  HILL  U  -     Nomally  produced  Balls. 
100-lb,   rails 


900 

800 

900 

700 

900 

600 

900 

500 

900 

900 

m 

900 

- 

900 

800 

900 

700 

900 

600 

900 

500 

900 

900 

- 

900 

• 

900 

- 

900 

800 

900 
900 

§2 

900 

500 

■900 

900 

• 

900 

- 

0.2 

- 

- 

7 

c 

0.6 

- 

- 

6 

0 

2.2 

less 

than  2,2 

0 

0 

4.6 

n 

"     1+.6 

0 

0 

- 

n 

'     1.9 

2 

0 

- 

n 

"     3.7 

0 

0 

- 

H 

"     5.t 

0 

0 

0.'+ 

- 

. 

U3 

7 

1.1 

- 

- 

7 

& 

3.V 

loss 

than  3,2 

0 

0 

5.3 

" 

"     5.3 

0 

0 

- 

R 

"      1.2 

21 

1* 

- 

II 

■    i.e 

u 

0 

- 

R 

"    3.3 

0 

0 

- 

"    5.e 

0 

0 

0.5 

- 

_ 

10 

It 

i.3 

- 

- 

0 

0 

3.3 

lets 

than  3,3 

0 

0 

b.7 

R 

"     6.7 

0 

0 

- 

" 

"     l,k 

13 

3 

- 

" 

"     2.e 

1 

0 

- 

" 

"    5."* 

0 

0 

10 


25 


710  Investigation    of    Fissures   in    Railroad    Rails 


TABLE  U  (Contlnaed) 

Eaat  Specimens Time  in  Time  to  Shatter  Cracks       Shatter  Cracks 

Pat  in  Sanoved  Box  Coo^  from        In  6>in«  In  6-ln.  of 

Box  at  from  700    7.   to  Stch  Specimen      Control  Speclmes 

Box    at  300°  P.  Cooled  in  Air 

hours  hours  Long.       Trans.       Long.     Trans* 

degrees  F*  degrees  7. 

Ill  .  TSSTS  AT  lilLL  M  -  100-1^.  Balls  from  Hjrdrogen-treated  Ingots. 
3  900  800  0.3  -     -  280       Us  i67         33 


700 
bOO 
500 


800  0.5  -      -  29         10  Uo 

500 


0.3 

. 

. 

280 

1*2 

1.1 

- 

_ 

261+ 

1*6 

1:5 

leas 

It 

than  2.C 

65 
0 

Ik 

0 

— 

"     2.1 

100 

^k 

* 

n 

'     lit 

"1 

k 

0 

0.5 

- 

. 

29 

10 

1.T 

- 

- 

8 

2 

2.2 

less 

*^l:l 

2 

0 

U.b 

II 

0 

0 

— 

N 

"    i»5 

21 

«s 

— 

It 

"     2.5 

3 

0 

— 

"     U.O 

0 

0 

- 

"    5.7 

0 

0 

0.3 

- 

- 

20 

g 

1.0 

B 

•• 

7 

^.V 

less 

than  2.9 

0 

0 

7.1 

R 

"     7.1 

0 

0 

- 

" 

"     2,0 

10 

140 

- 

» 

"    3.5 

k 

2 

- 

" 

"     6.2 

0 

0 

12  900  800 

900  700  1.0  -      -  7         Zk  18  qU 

900  600  2.9       less  than  2.9  0  0 

900  500 


lY.     TESTS  AT  MIUi    D  -  131-lt.  Itolls  from  Hydrogen-treated  Ingots, 


1«0  -    ^      150        5U  207  U3 

2,0  ""         -'  ^ 

3.0 

Kq 

5,0 
6,0 

3.0 
Si.o 
5.0 
6.C 
7.0 
8,0 

2.0  -    -        75        1^  210  90 

klo 

5.0 
6,0 
7.0 


U1003 

1100 

930 

Ingot  9 

1100 

8S0 

1100 

760 

1100 

760 

uoo 

710 

1100 

720 

700 

1*70 

700 

410 

700 

1*30 

700 

1*25 

700 

hjo 

700 

450 

U1003 

950 

710 

Ingot  11 

950 

700 

950 

665 

950 

61«o 

950 

520 

950 

530 

>K)159 

700 

H65 

700 

U50 

700 

U25 

700 

m 

700 

iwo 

700 

390 

>   .t 

150 

5U 

-   - 

112 

24 

-   - 

35 

7 

•    - 

0 

0 

-   - 

0 

0 

-    • 

0 

0 

IS 

50 

20 

11 

8 

5.3 

3 

1 

b.3 

0 

0 

7.3 

0 

0 

8.3 

0 

0 

.    . 

75 

40 

•    - 

25 

16 

1.3 

3 

1 

2.1 

0 

0 

4.7 

0 

0 

5.0 

0 

0 

2.1 

230 

^7 

56 

26 

5.2 

U2 

15 

6.1 

k 

0 

7.1 

0 

0 

8.1 

0 

0 

3.1*  ^.2       230         4^  128  29 

slo* 
6,0» 
7.0* 

8,0* 


•  After  remoTal  from  cooling  box,   specimen  was  cooled  to  100    F, 
under  a  3-ft,  mill  fan  end  then  placed  In  Ice  water  for  8  hows 
to  reprdcent  severe  winter  cooling  conditions. 


Investigation    of    Fissures   in    Railroad   Rails 


711 


88 
78 

73 
5^ 


91 

6k 
69 


TESTS  FOE  SHATTKE  CHACKS  IN  BAIL  SPBCIMMS  WHICH  VSBS  HIMOVBD 
PHCW  JSPTCIAL  COOUNQ  box  at  a  HNPEHATOHB  HlfflfflR  THAH     300'  P, 


Heat    Wt.of 

Ball      Put  In 
Box  at 


Speclmene 


F.emoved 
from 
Box  at 


l)).per 

yard    iegreea  F.  degrees  F* 


Time 
Box 


hour* 


Shatter  cracks 
In  6-ln, 
Stch  Specimen 


Long*   Trans* 


I.  TESTS  AT  MILL  7 
(a)  112-11*  lulls 


-  Normally  produced  rails* 


112 
112 

112 
112 


700 
Goo 

800 

gs 

800 
700 

Soo 

800 
700 


70   130 


130 
130 
130 


100 


100 


100 


900 
900 

900 
900 
900 

900 
900 

900 

900 
900 
900 

(b)  130-lb*  rails 

900 
900 
900 

900 
900 
900 

900 
900 
900 

900 
900 

900 


less  than 


800 
700 
600 

800 
700 
600 

800 
700 


800 
700 

600 


1.8 
1.9 

2*6 

2.3 
3.2 
5,h 


2.9 

3.7 
5.5 

2.6 

3.1 

5.8 
2.8 
U.O 
7.0 

2.8 
3.2 
5.5 


1 

0 
0 

20 

9 
0 

6 
0 
0 

16 
5 
0 


n*  TESTS  AT  MILL  U  -  Honnalljr  produced  rails. 


900 
900 
900 
900 


900 

900 

900 
900 
900 
900 


loo-lb,  rails 

800 
700 
600 
500 

800 
700 
600 
500 

800 
700 
600 
500 


3   100 


100 


12   100 


900 
900 
900 
900 

900 

900 
900 
900 

900 
900 
900 
900 


800 
700 
600 
500 

800 


500 

800 
700 
600 

50O 


0*2 
0.6 

I          '0 

2*2 

0           0 

Ke 

0           0 

U 

'?      I 

3.2 

0           0 

5.3 

0           0 

0.5 

10           k 

1.3 

0           0 

3.2 

0           0 

fc.7 

0           0 

s  from 

Hjrdrogen-treate 

0.3 

280            U2 

1.1 

264             46 

2.2 

2              0 

<>.x 

0               0 

0.5 

29           10 

i:l 

5  2 
2               0 

h,b 

0               0 

©•3 
x«o 

20  6S 
7            24 

2.9 

0              0 

7.1 

0              0 

Shatter  cracks 
In  6-ln,  of 
Control  Specimen 
Cooled  In  Air 


Long*   Trans* 


22 
29 

15 
22 

16 
2U 
23 

20 

10 
25 


167 


>»0 


18 


33 


9^ 


712  Investigation    of    Fissures   in    Railroad    Rails 


SABLE    3  (Contlaued) 

Heat     ft.of               Specimens  IEi™e  la               Shatter  Cracks  Shatter  Cracks 

Ball        Put  la          EeooTsd  Box                    in  6-ln,  in  6-in,  of 

Box  at           from  Itch  Specimen  Control  Specimen 

Box  at  Cooled  In  Air 

Ib.per 

yard        degrees  F,  degrees  ?.  hours                 I>ong.       Trans.  Long,         Trans. 

IV,     TESTS  AT  Mill  B  -  131-lt,  Halls  fran  Hydrogen-treated  Ingots,. 


86371       131  500  390  3.0 


S6373       127  500  1+20  3.0 

•  «»0  ■?8'5  '^•O 


Ingot 
U 


500 

390 

^0 

%5 

500 

360 

500 

U20 

500 

385 

500 

380 

500 

325 

500 

385 

500 

375 

500 

360 

500 

325 

1100 

930 

1100 

880 

iiOO 

7G0 

1100 
1100 

lis 

uoo 

720 

700 

470 

700 

kw 

700 

kso 

700 

^so 

700 

1*30 

700 

U50 

950 

710 

950 

700 

950 

670 

950 

9k> 

950 

520 

950 

530 

500 

380 

500 

370 

500 

350 

500 

350 

500 

320 

500 

330 

700 

470^ 

700 

lAo'' 

700 

hyi^ 

700 

1+20'' 

700 

Uoo* 

700 

390^ 

5.0 
6.0 


3.0 
h,o 
5.0 
6,0 
7.0 

3.0 
H.O 

5.0 
6.0 
7*0 
8.0 


1*0159    131        700  470^  3.0 

700  kko^  ^.0 

5.0 


6,0 
7.0 
8.0 


2l)0  65 


5.0 
6,0 

85371      127  500  385  3»0 

fioo  375  '♦.0 

5.0 

6,0 

U1003     131       1100  930  1.0 

Ingot  9  UOO  880  2.0  112  2^  ^^  ^ 

U.0 

5.0 
6,0 
3.0 

4.0 

5.0 
6.0 
7.0 
8.0 

I4IOO3     131  550  710  2.0  75  ^  210  90 


21 

2 

'? 

2 
0 

3 

0 

7 

2 

1 

0 

0 

0 

1 

0 

90 

15 

26 

7 

21 

3 

1 

0 

150 

54 

112 

2h 

35 

5 

0 

0 

0 

0 

0 

0 

50 

11 

20 

8 

3 

1 

0 

0 

0 

0 

0 

0 

75 

140 

25 

16 

3 

1 

0 

0 

0 

0 

0 

0 

31 

12 

19 

5 

0 

3 

0 

0 

0 

0 

0 

0 

.230 

U7 

5b 

26 

42 

15 

U 

0 

0 

0 

0 

0 

160  55 


28 


128  29 


^     Hall  cooled  by  J-foot  fan  and  Ice  water  on  removal  from  the  cooling  tox. 


Investigation    of    Fiss  ures    in    Railroad    Rails 


713 


■I       on 

7         rH  a 
)  rJ  5 

>  O  fl 

>  "M'tJ 

o 
;      « o 

I  i-i  (p 

>  a  a  <^ 


;  ^1 


o  o 
u 

o  o 


■a 


^: 


6   o  I 


fVJ  <H  iH  iH 


CTv        R  5S 


^    5 


©  -^  -rt  d 


0)    o  I 

d  o 


•tf        ffi 
•H  d  S 

d  ♦»  -S 

JH.g 


3»  o  ,-1  K 


&       5^        I 


S     8 


^ 


TESTS  POH  SHATTER  CRACKS  IH  RAIL  SPBCIMEHS  PUT  IK70  SPBCLW, 
COOLIKO  BOXES  AT  TaffERATUEES  07     llOO     Fahr.     OB  LOTOR. 

"gJJ^         yt.af                   Speclmena  Time     In         Shatter  Cracks           Shatter  Cracks 

Ball                Put  in  Box              In  6-ln.                      in  6-in.  of 

Sox  at  Etch  Speclioen            Control  %ieciiaen 

ll),per  Cooled  In  Air 

yard               degrees  I.  hours           z^.         Trans,         Long.         Trans. 


I,     TESTS  AT  MILL  ?  -    Hoinally  produced  rails. 

«             112                       200                                      21  1  0 

21  0  0 

21  0  0 

200                                      21  3  0 

21  0  0 

a  0  0 


7« 

112 

73 

112 

^ 

112 

70 

131 

91 

131 

9i 

131 

69 

131 

II. 

2 

100 

300 
uoo 


300 

I«00 


29 


200  21  0  0 

300  21  0  0  15 

UOO  21  0  0 

200  21  2  0  22 

300  21  0  0 

UOO  21  0  0 

300  21  0  0  16 

I40O  21  0  0 

300  21  0  0  2l* 

I40O  21  0  0 

300  21  0  0  23 

IJOO  21  0  0 

300  21  0  0  20 


TESTS  AT  MILL  U  -    Komally  produced  rails. 

200  18.0  0  0  10 

0 


300 
WO 


18.0 

7.6 

12.6 

0 
0 
0 

lU.? 

7 
0 
0 

19.8 

8.7 

1U.S 

7 

0 
0 

0 


100  200  lU.?  7  0  25 

300  5*^  0  0 

100  200  19.8  70s 

300  8.7  0  0 

0 


III.      T^STS  AT  MILL    U  -  Balls  from  Hydrogen-treated  Ingots. 

3  100  200  15.1        loU  h  167  33 

TOO  6.'*  g  0 

1(00  11»6  0  0 

8  100  200  21.0  5  0  "W  6 

g.5  0  0 


300 
MOO 


11.8  0  0 


12  100  200  21.0  1  0  18  9^ 

300 
MOO 


8.5      0       0 

13.5     0     0 


IT.  IES7S  AT  MILL  D  -  Ralls  from  Hydrogen- treated  Ixxgots. 

86371     131         210  More  than  10.0  30  1      l6o       55 

255  "  "  10.0  lU  C 

320  "  "  10.0  2  0 

U20  19.0  0  0 

86373      127          200  «  »  10.0  13  0       87        28 

250  "  "  10.0  1  0 

300  »  «  10,0  0  0 

UOO  20.0  0  0 

85371    127       200  •  "  7.0  110  7     s'to      65 

260  »  «  10,0  19  0 

300  "  •  10.0  2  0 

Moo  18.5  0  0         ______ 


Investigation    of    Fissures    in    Railroad    Rails 715^ 

27.  Is  It  Necessary  to  Allow  Rails  to  Remain  in  the  Cooling  Box  Until 
They  Have  Cooled  Down  to  300  deg.  F,? — The  recommended  standard  practice 
now  in  general  use  for  control-cooling  of  rails  requires  that  they  be  not  removed  from 
the  cooling  container  until  all  rails  have  cooled  down  to  300  deg.  F.  This  frequently 
requires  20  to  30  hours  before  the  slowest  cooHng  rail  in  the  container  reaches  that 
temperature.  This  is  a  source  of  expense  in  rail  production. 

To  throw  light  on  this  question  Table  5  has  been  prepared  from  the  data  of  the 
series  of  tests  made  at  the  different  rail  mills.  In  this  table  are  recorded  the  results  of 
tests  of  89  rail  specimens  each  of  which  was  removed  from  the  cooling  box  at  a  tem- 
perature above  300  deg.  F.  An  examination  of  this  table  shows  that  none  of  these  rail 
specimens  which  had  remained  in  the  cooling  box  as  long  as  7  hours  developed  shatter 
cracks.  It  therefore  seems  that  the  tests  showed  that  shatter  cracks  were  prevented  in  all 
rail  specimens  which  were  placed  in  the  cooling  boxes  at  a  temperature  of  700  deg.  F.  or 
higher  and  which  remained  in  the  boxes  for  7  hours  or  longer  without  cooling  below 
300  deg.  F. 

In  this  connection  the  question  was  raised  whether  the  above  conclusion  would  hold 
in  winter  weather,  when  rails  removed  from  cooHng  containers  above  300  deg.  F.  would 
be  subjected  to  a  more  rapid  cooling  to  air  temperature  than  was  the  case  during  these 
tests  which  were  mainly  in  the  summer.  To  answer  this  question  the  rail  specimens  from 
Mill  D,  Heat  40159,  on  being  removed  from  the  cooling  boxes  were  cooled  down  to 
100  deg.  F.  under  a  3-ft.  mill  fan,  and  then  placed  in  ice  water  for  8  hours.  This  drastic 
treatment  did  not  develop  shatter  cracks  in  any  rail  which  had  been  in  the  cooling  box 
for  7  hours  or  more.  The  answer  to  the  question,  "Is  it  necessary  to  allow  rails  to 
remain  in  cooling  box  until  they  have  cooled  down  to  300  deg.  F.?"  seems  to  be  "no," 
not  if  a  rail  is  placed  in  a  cooUng  container  at  700  deg.  F.  or  higher,  and  remains  there 
for  7  hours,  or  longer,  without  cooling  below  300  deg.  F.  So  long  as  a  rail  does  not  cool 
below  a  certain  minimum  temperature,  it  seems  to  be  time  in  the  cooling  container, 
rather  than  minimum  temperature  reached  which  is  significant. 

28.  Rates  of  Cooling  of  Rails  in  Commercial  Cooling  Containers. — Two 

series  of  tests  have  been  made  on  rates  of  cooling  in  coohng  containers  in  use  in  Mills  D, 
E,  F,  and  G.  The  first  series  of  tests  showed  that  the  rails  in  the  lower  layer  of  some 
containers  cooled  very  rapidly — coohng  from  700  deg.  F.  to  300  deg.  F.  in  3  hours  or 
less  in  some  cases.  Since  tests  had  shown  that  it  was  not  necessary  to  wait  until  all  rails 
had  reached  300  deg.  F.  before  removing  any  rails  from  the  cooling  box,  it  became  pos- 
sible to  remedy  this  rapid  cooling  by  better  insulation  of  the  boxes  against  loss  of  heat. 
Figures  15  and  16  show  how  such  insulation  may  improve  the  control-cooling  process. 
Figure  15  shows  the  cooling  curves  for  rails  in  various  locations  in  an  uninsulated  cooling 
container.  One  of  the  test  rails  cooled  from  700  deg.  F.  to  300  deg.  F.  in  3  hours  and 
another  in  5  hours.  Figure  16  shows  cooHng  curves  for  rails  in  an  insulated  cooHng  box 
at  the  same  mill.  The  fastest  cooling  rail  cooled  from  700  deg.  F.  to  300  deg.  F.  in  7  hours. 
Nearly  all  the  cooling  containers  in  United  States  mills  are  now  insulated.  The  bottom  of 
the  cooling  box  or  car  is  covered  with  a  layer  of  insulating  material,  and  the  sides  and 
ends  are  insulated  to  a  height  of  two  or  three  feet.  It  seems  important  that  there  should 
be  a  minimum  of  air  space  between  the  rails  and  the  sides,  ends  and  floor  of  the  cooling 
box  or  car. 

An  obvious  way  of  taking  advantage  of  improved  insulation  in  containers,  and  of 
the  fact  that  it  seems  unnecessary  that  all  rails  cool  to  300  deg.  F.  before  the  container 
is  opened,  is  to  allow  the  removal  of  the  lid  from  the  cooling  container  after  some 
minimum  time.  This  procedure  was  tried  on  hydrogen-treated   rails  at   Mills  D,   E,  F, 


716 


Investigation    of    Fissures   in    Railroad   Rails 


TIME  -  HOURS 
Fig.  IS. — Cooling  Curves  for  Rails  in  Commercial  Cooling  Box  Without  Special  Insulation. 


and  G,  using  an  interval  of  12  hours  from  the  time  of  placing  the  lid  on  the  container 
to  the  time  of  its  removal.  Rails  were  removed  as  soon  as  it  was  deemed  they  would  not 
suffer  distortion  by  handhng.  Figure  16  shows  a  typical  set  of  cooling  curves,  and  Table  6 
gives  the  test  results.  It  will  be  noted  that  the  air-cooled  control  rail  specimens  showed 
numerous  shatter  cracks,  but  that  no  shatter  cracks  were  found  in  the  hydrogen-treated 
rails  which  were  control  cooled  using  this  "lid-lifting"  procedure.  Some  of  these  test  rails 
were  placed  in  the  top  layer  of  the  box,  some  in  the  bottom  layer.  At  two  of  the  mills 
the  fastest  cooling  rail  cooled  to  300  deg.  F.  in  less  than  7  hours.  However,  none  of  the 
control-cooled  hydrogen-treated  rails  developed  shatter  cracks.  These  tests  give  rather 
strong  evidence  of  the  rehability  of  the  plan  proposed,  to  remove  the  lid  from  the 
cooling  container  after  a  definite  interval  of  time. 

29.  At  What  Temperature  Do  Shatter  Cracks  Actually  Form?— This  ques- 
tion is  of  interest,  although  it  does  not  bear  directly  on  the  question  of  details  of  pro- 
cedure in  control  cooling  of  rails.  Table  7  lists  results  of  tests  on  49  rail  specimens  at 
three  mills  which  were  put  into  cooling  boxes  at  low  temperatures,  and  allowed  to  stay 
there  for  periods  varying  from  5.4  hours  to  21  hours.  It  will  be  noted  that  some  speci- 
mens put  in  at  200  deg.  F.  showed  shatter  cracks  even  after  21  hours  in  the  coohng  box. 
This  seems  to  indicate  that  in  those  cases  the  shatter  cracks  had  begun  to  form  before 
the  specimens  were  placed  in  the  coohng  box.  On  the  other  hand,  the  specimens  put  in 
at  300  deg.  F.  showed  very  few  shatter  cracks.  This  would  seem  to  indicate  that  the 
actual  formation  of  shatter  cracks  takes  place  somewhere  in  the  temperature  range  from 
200  to  300  deg.  F.  It  may  be  noted  that  tests  by  Wishart  and  Swanson®  on  rail  specimens 
placed  in  a  furnace  and  reheated  after  they  had  cooled  to  200  deg.  F.  show  some  evi- 
dence that  the  formation  of  shatter  cracks  may  begin  nearer  to  200  deg.  F.  than  to 
300  deg.  F.  It  is  to  be  noted  that,  although  shatter  cracks  actually  form  at  or  below 

*  Trans.,  Am.  Soc.  Metals,  September  1939,  p.  785,  footnote. 


Investigation   of    Fiss  ures   in    Railroad    Rails 717 


900 


-Cooling  Curves  for  Rails  in   Commercial  Cooling  Box   with   Insulation 
Around  Bottom  and  Ends  of  Box. 
This  test  made  at  the  same  mill  and  under  approximately   the  same   air  temperature 
as  the   test  shown   in   Fig.   IS. 


300  deg.  F.,  the  rate  of  cooling  at  temperatures  above  that  range  determines  whether  or 
not  shatter  cracks  occur. 

Two  main  results  of  the  tests  of  control  cooling  of  rails  may  be  summed  up  as 
follows: 

(a)  No  evidence  of  shatter  cracks  was  found  for  rails  or  rail  specimens 
which  were  placed  in  the  cooling  container  at  a  temperature  of  700  deg.  F.  or 
higher,  provided  that  the  fastest  cooling  rail  (usually  a  corner  rail  in  the  bottom 
row)  did  not  cool  down  from  700  to  300  deg.  F.  in  less  than  7  hours. 

(b)  Removing  the  lid  from  the  container  12  hours  after  it  had  been  put  in 
place  did  not  develop  shatter  cracks  in  any  rail  for  which  the  conditions  outlined 
in   (a)   were  fulfilled. 

30.  Tests  of  Rails  Held  at  Constant  Temperatures. — Tests  on  another  type 
of  thermal  treatment  which  has  been  used  at  one  mill  give  information  on  the  time 
necessary  to  hold  rails  at  various  constant  temperatures  to  prevent  the  formation  of 
shatter  cracks.  These  tests  were  all  made  at  Mill  D  on  131-lb.  rails.  After  the  hydrogen- 
treated  specimens  were  cut  at  the  hot  saws  they  were  cooled  on  the  mill  floor  to  tem- 
peratures of  1,100,  900,  700  and  500  deg.  F.  and  all  but  the  control  specimen  were  placed 
in  a  gas-fired  furnace  held  at  the  above  temperatures.  The  results  of  these  tests  are 
summarized  in  Table  8. 

After  being  removed  from  the  furnace  the  specimens  from  Tests  3  and  4  were 
cooled  under  the  mill  fan  and  then  in  ice  water  for  eight  hours.  This  accounts  for  the 


718 


Investigation    of   Fissures   in    Railroad   Rails 


Table  8 

Results  of  Etch  Tests  of  Specimens  Held  For  Various  Lengths  of  Time  at 
Four  Different  Temperatures 


tN 

umber  of  Shatter  Cracks  on  One 

Constant 

Time  in 

Side  of  Six-inch  Slice 

Furnace 
Temperatures 

Furnace, 
Hours 

Test  1 

Test  2 

Test  3** 

Test  4** 

Control  Spec* 

0 

105  L,  45  T 

1,100°  F. 

1 
2 

65  L,  24  T 
5L, 

3 

0 

4 

0 

5 

0 

6 

0 

Control  Spec* 

0 

160  L,  44  T 

87  L,  18  T 

92  L,  62  T 

125  L,  50  T 

900°  F. 

1 

86  L,  14  T 

26  L,    4  T 

191  L,  78  T 

160  L,  50  T 

" 

2 

55  L,    8T 

8L, 

43  L,  21  T 

163  L,  44  T 

>> 

3 

3L,    2  T 

0 

8  L,    1  T 

14  L,    3  T 

i> 

4 

0 

0 

0 

0 

>i 

5 

0 

0 

0 

0 

" 

6 

0 

0 

0 

0 

Control  Spec* 

0 

116  L,  19  T 

118  L,  21  T 

700°  F. 

1 

85  L,    8  T 

94  L,  10  T 

2 

14  L, 

29  L,    IT 

3 

IL, 

4L, 

4 

0 

0 

5 

0 

0 

6 

0 

0 

Control  Spec* 

0 

139  L,  46  T 

500°  F. 

1 
2 
3 
4 
5 
6 

138  L,  57  T 
52  L,  28  T 
44  L,    5  T 
10  L,    IT 

0 

0 

transverse    (T)    shatter   cracks 


*  Control  specimen  cooled  in  air  outside  the  mill. 

t  Shatter  cracks  are  recorded  as   the  number  of  longitudinal    (L)    or 
on  one  side  of  a  longitudinal  slice  six  inches  long. 

**  For  Tests  3  and  4,  after  the  specimens  were  removed  from  the  furnace  they  were  cooled  under 
a  mill  fan  and  then  in  ice  water  for  eight  hours. 


increased  number  of  shatter  cracks  in  the  specimen  held  in  the  furnace  one  hour  as 
compared  with  the  number  found  in  the  control  specimen  cooled  on  the  mill  floor.  It 
will  be  noted  that  the  formation  of  shatter  cracks  was  prevented  by  holding  the  speci- 
mens 3  hours  at  1,100  deg.  F. ;  4  hours  at  900  deg.  F.  and  700  deg.  F.;  and  S  hours  at 
500  deg.  F.  The  tests  also  furnish  further  evidence  that  after  the  rails  have  been  held  a 
sufficient  time  at  a  given  temperature,  fast  cooHng  to  freezing  temperatures  is  not 
dangerous. 

31.  The  Brunorizing  Process  for  Rails. — A  commercial  process  of  normalizing 
rails  was  developed  by  the  Illinois  Steel  Company  in  1936.  Rails  treated  by  this  process 
are  called  Brunorized  rails  in  honor  of  Mr.  John  Brunner,  manager,  Department  of 


Investigation    of    Fissures    in    Railroad    Rails 719 

Metallurgy  and  Inspection,  Carnegie-Illinois  Steel  Corp.,  co-chairman  of  the  contact 
committee  during  the  early  part  of  the  Rails  Investigation.  An  important  modification 
in  this  process  was  made  in  April  1938  which  includes  holding  the  rails  in  gas  heated 
containers  at  a  temperature  about  1,000  deg.  F.  for  two  or  more  hours  before  the  nor- 
malizing treatment.  A  few  heats  of  rails  produced  by  the  Brunorizing  process  before  the 
modification  in  1938  have  developed  typical  transverse  fissures  in  service  from  shatter 
crack  nuclei  but  no  Brunorized  rails  produced  after  the  holding  period  was  adopted  have 
developed  fissures.  Laboratory  tests  were  made  of  hydrogen-treated  rails  produced  by 
the  modified  process  but  no  shatter  cracks  were  found  while  companion  rails  cooled  on 
the  hot  bed  developed  many  shatter  cracks.  Laboratory  tests  and  service  records  so  far 
available  indicate  that  the  holding  period  is  adequate  to  prevent  shatter  cracks  in 
Brunorized  rails. 

32.  The  Service  Record  of  Control-Cooled  Rails. — Mr.  W.  C.  Barnes,  engineer 
of  tests  for  the  AREA  Committee  on  Rail,  reports  about  3,000,000  tons  of  control-cooled 
rail  (rolled  under  contract,  not  including  experimentally  control-cooled  rail)  in  service 
June  30,  1940.  Up  to  October  1940  only  three  actual  fissures'  in  control-cooled  rail  and 
one  vertical  split  head  had  been  reported  to  the  test  party.  Laboratory  tests  showed  that 
two  of  the  three  fissures  started  from  large  slag  inclusions  near  the  tread  of  the  rail,  and 
that  the  third  started  from  blow  holes  in  the  head  of  the  rail.  A  vertical  split  head 
had  developed  from  a  gross  slag  segregation  surrounded  by  a  large  area  of  decarburized 
steel.  All  four  rails  were  found  to  be  free  from  shatter  cracks.  This  may  be  considered 
a  decidedly  promising  record  for  control-cooled  rails,  and  gives  ground  for  the  expectation 
that  very  few,  if  any,  control-cooled  rails  will  develop  the  ordinary  type  of  transverse 
fissure,  originating  in  a  shatter  crack. 

33.  What  Control  Cooling  Will  Not  Do  for  Rails. — A  word  of  caution  about 
control-cooled  rails  seems  in  order.  Control  cooling  is  not  a  panacea  for  all  rail  troubles. 
It  will  not  prevent  segregation  and  slag  inclusions.  It  will  not  prevent  decarburization  of 
steel.  It  will  not  prevent  undue  wear  at  the  tread,  with  consequent  slivering  and  some- 
times the  starting  of  a  progressive  (fatigue)  fracture.  It  will  not  prevent  failures  starting 
in  the  base  or  the  web  of  the  rail.  It  will  not  prevent  failures  starting  from  wheel  burns 
on  rail.  It  seems  so  far  to  be  a  very  effective  inhibitor  of  shatter  cracks,  and  may  be 
expected  to  reduce  very  greatly  transverse  fissure  failures  and  compound  fissure  failures 
as  the  ratio  of  control-cooled  rail  to  total  rail  in  service  increases. 

VI  Chemical  Composition  and  Metallographic  Structure 

of  Rail  Steel 

By  R.  E.  Cramer 

34.  Chemical  Composition  of  Rail  Steel.— During  the  investigation  heat  analyses 
were  furnished  the  test  party  for  all  test  rails.  However,  all  the  test  rails  showed  chemical 
analyses  within  the  allowable  limits  set  by  AREA  specifications.  Table  9  gives  those 
limits. 

During  the  early  part  of  the  investigation,  when  testing  130-lb.  rails,  shatter  cracks 
were  found  to  be  more  prevalent  in  rails  of  high  silicon  content.  However,  in  later  tests 
of  110-lb.  rails,  especially  those  from  one  rail  mill  which  were  quite  high  in  silicon,  this 
relationship  between  high  silicon  and  shatter  cracks  broke  down. 


*  Several  broken  raik  had  been  repwrted  as  "transverse  fissures"  or  "compound  fissures",  which  ,on 
examination  were  found  to  be  failures  starting  from  the  surface  at  a  bum  or  at  the  flowed  metal  at  an 
upper  comer  of  the  head  of  a  rail.  Such  failures  are  not  properly  classified  as  fissures,  which  start 
from  the  inside  of  the  head  of  the  rail. 


720 


Investigation   of    Fissures   in    Railroad   Rails 


*  .« 


»^  A 


gffj-''    J  ■»^'   'V  •'■-•''*      '-3*    ■■  '         '   ^ 


7        '"^---^kii^iikkj  #^'  -  ■'♦ 


8 


•*>?SwWiPW'^ 

1 

b 

i 

Fig.  17.— Longitudinal  Horizontal  Sections  of  Rail  Heads  Showing  Segregation  Streaks. 

(a)  Rail  82.  Etched  in  acid  to  show  segregation  streaks.  Numbers  indicate  location  of  tension  specimens 
from  the  rail.  Chemical  analysis  made  of  material  in  streaks  m  this  rail.  ^,,„^i,pi 

(b)  Rail   92.  Etched  in  acid  showing  segregation  streaks  from  which  material  was   taken   for  chemical 
analysis.  ,       ,  ,         ,  .     ^    . 

(c)  Longitudinal  section  of  Rail   82.  No  shatter  cracks  shown  by  etch  test.  ,„„„„,♦;„„ 

(d)  Longitudinal  section  of  Rail   546.  Both   transverse  and  longitudinal  shatter  cracks  along  segregation 
streaks  shown  by  etch  test. 


Investigation    of    Fissures   in    Railroad   Rails 


721 


Table  9 

Standards  for  Chemical  Content  of  Rail  Steel 

AREA  Standards 

Item  1931  As  Revised  1933 

Weight  of  Rail,  lb.  per  yd 110-120       120-140  110-120  120-140 

Carbon,  percent    0.67-0.83     0.72-0.89  0.67-0.80  0.68-0.82 

Manganese,    percent    0.50-0.90     0.50-0.90  0.70-1.00  0.70-1.00 

Phosphorus,  percent,  max 0.04             0.04  0.04  0.04 

Silicon,   percent    0.15  min.     O.lS  min.  0.10-0.23  0.10-0.23 

It  was  generally  recognized  that  there  were  more  shatter  cracks  in  rails  of  the 
higher  carbon  content.  Because  of  these  considerations  the  chemical  analysis  of  carbon 
steel  rails  was  revised  by  the  AREA  in  1933  to  slightly  lower  the  carbon  content,  and 
definite  limits  were  set  on  the  silicon  content.  The  changes  in  chemical  analyses  were 
made  before  control  cooling  was  adopted  by  the  United  States  rail  mills. 

35.  Segregation  of  Chemical  Constituents. — It  is  well  recognized  that  it  is 
difficult  to  prevent  chemical  segregation  in  ingots  of  the  size  used  for  railroad  rails, 
which  are  around  2  ft.  square  by  80  to  90  in.  high.  Such  ingots  require  considerable  time 
to  solidify  to  the  center  so  if  the  molten  steel  is  not  in  the  ideal  state  for  pouring,  the 
ingots  may  develop  segregation  or  pipes.  Phosphorus,  sulphur  and  carbon  are  the 
chemical  elements  most  likely  to  segregate.  The  recent  adoption  of  the  all-ingot  nick  and 
break  test  should  reduce  to  a  minimum  the  number  of  piped  or  web  segregated  rails 
which  will  be  put  in  service  in  track. 

Table  10 
Chemical  Composition  of  Segregated  Streaks  in  Rails  82  and  92 


Chemical 

Content- 

-Per   cent 

Rail 

Method  of  Sampling 

C 

Mn 

Si 

P 

.S 

82 

Composite  sample  across 
rail  

0.79 

0.88 

0.06 

0.035 

0.026 

Sample  from  segregation 
streaks 

Increase  in  streaks 

0.87 
0.08 

0.96 
0.08 

0.05 
—0.01 

0.100 
0.065 

0.067 
0.041 

92 

Composite  sample  across 
rail   

0.69 

0.80 

0.17 

0.029 

0.041 

Sample  from  segregation 

streaks 

Increase  in  streaks 

0.77 
0.08 

0.87 
0.07 

0.16 
—0.01 

0.066 
0.037 

0.076 
0.035 

Careful  consideration  has  been  given  during  the  course  of  the  Rails  Investigation  to 
segregated  streaks  found  throughout  the  heads  of  some  rails.  Figure  17  (a)  and  (b) 
show  two  examples  containing  very  large  segregation  streaks.  Drillings  for  chemical 
analyses  were  taken  from  the  segregation  streaks  of  these  two  rails  using  a  drill  0.086 
in.  in  diameter.  For  comparison  a  composite  sample  was  made  with  a  %-in.  drill  of  the 
metal  across  the  width  of  the  heads  midway  between  the  top  and  bottom.  The  analyses 
of  these  samples  are  given  in  Table  10. 


722 


Investigation    of    Fis sures   in    Railroad   Rails 


These  analyses  show  a  decided  segregation  of  phosphorus  and  sulphur  in  the  streaks 
and  some  increase  in  the  carbon  and  manganese.  To  determine  the  effect  of  this  com- 
position on  the  physical  properties  of  the  metal  in  the  streaks,  8  tensile  specimens  yi  in. 
in  diameter,  at  the  reduced  section,  were  machined  from  Rail  82  which  is  shown  in 
Fig.  17  (a).  This  rail  did  not  contain  shatter  cracks  in  the  segregation  streaks  as  is  evi- 
dent in  Fig.  17  (c).  The  method  of  obtaining  such  specimens  was  to  etch  both  ends  of 
4%-in.  sections  of  the  rail  head  and  to  center  punch  the  streaks  which  extended  through 
the  sections.  The  tensile  specimens  were  then  turned  out  using  these  punch  marks  as 
centers.  Two  control  specimens,  No.  7  and  No.  8,  were  taken  from  the  lower  corners  of 
the  head  which  did  not  contain  segregation  streaks.  The  specimens  were  tested  in 
spherical  seated  holders  in  an  Olsen  10,000-lb.  testing  machine  and  special  care  was  taken 
to  line  up  the  axis  of  each  specimen  perpendicular  to  the  plane  of  the  cross-head  of  the 
testing  machine.  Table  11  gives  the  results  of  the  tensile  tests. 

Table  11 

Tensile  Test  Results  of  Specimens  From  Segregated  Streaks  and  From 
Unsegregated  Metal  in  Rail  82 


Specimen 

Tensile 

Strength, 

lb.  per 

sq.  in. 

Elongation 
in  3  in., 
percent 

Reduction 
of  Area, 
percent 

Specimens  From  Segregated  Streaks 
82-1                   

146,500 
144,000 
142,300 
140,000 
133,300 
144,600 

"4.3 
6.0 
6.0 
7.0 
6.0 

7.8 

82-2                      

8.4 

82-3                            

10.8 

82-4                                

8.5 

82-5                                        -         

15.0 

82-6                        

11.0 

Av.                 -     

141,800 

113,500 
117,500 

5.9 

14.0 
12.5 

10.3 

Specimens  From  Unsegregated  Metal 
82-7                      --     

20.2 

82-8                            

28.9 

Av.                                

115,500 

13.2 

24.6 

1 

It  will  be  noted  that  the  metal  in  the  segregated  streaks  was  stronger  but  lower  in 
ductihty  than  the  unsegregated  metal.  The  results  of  these  chemical  and  physical  tests 
give  some  explanation  why  shatter  cracks  are  often  located  along  or  radiating  from 
segregation  streaks,  as  shown  in  Fig.  17  (d).  It  seems  that  the  brittle  material  of  the 
streaks  would  be  more  subject  to  cracking  than  the  more  ductile  metal  surrounding  the 
streaks  and  so  it  is  not  unusual  to  find  some  rails  containing  shatter  cracks  only  along 
such  streaks. 

36.  Metallographic  Tests  of  Rail  Steel. — Metallographic  examination  of  pol- 
ished specimens  has  been  an  important  tool  throughout  the  investigation.  It  is  difficult 
to  summarize  the  metallographic  tests  because  so  large  a  portion  of  this  work  has 
necessarily  been  of  a  routine  nature.  Metallographic  testing  has  been  used  to  study  rails 
for  grain  size,  impurities,  location  of  cracks,  decarburization  both  external  and  internal, 


Investigation    of    Fissures    in    Railroad    Rails 


723 


C^ 


Pi 


o 

'^  a 

-"   o 

m 

o|^ 

■-' 

j3 

13  C  ^ 

g-  n 

n-gs 

<c  3-5; 

"n^- 

n      a 

•^■9  — 

■^  c,« 

<u  a 

a-|'§ 

M"^   1- 

•-00 

G 
3 
O 

a 

E 

o 


>      "u  2  o 

S  -  =•  0 - 
■q   ia>-i.2  o 

<  .B      a" 
g  '5.  rt  ■" 


724 


I  n  V  es  ti  srat  io  n    of   Fissures   in    Railroad   Rails 


Fig.  19. — Typical  Crystalline  Structures  of  Rail  Steel. 

(a)  Excess   ferrite.  Magnification   110   X-  Etch   2   percent  picral. 

(b)  Pearlitic   structure.  Magnification    110    X-  Etch    2    percent   picral. 

(c)  Excess   cementite.  Magnification    110    X-  Etch   sodium   picrate. 

(d)  Pearlitic  structure.  Magnification   1,100  X-  Etch  2   percent  picral. 


I 

In* 


>«:,r\J 


Fig.  20.— Path  of  Fatigue  Crack  Through  Pearlite. 

Magnification    1,500    X.  Etch   2    percent  picral.  Note   that   the   crack   is 
comparatively  straight  with  no  branches. 


Investigation   of    Fissures   in    Railroad   Rails 


72S 


etc.  About  1,000  photomicrographs  have  been  taken,  using  magnifications  from  100  X 
to  4,000  X)  and  these  are  available  in  the  files  of  the  Rails  Investigation.  Most  photo- 
micrographs of  the  grain  structures  of  rails  have  been  taken  at  either  200  X  or  2,000  X 
magnification,  depending  on  whether  it  was  desirable  to  show  the  general  grain  size  or 
the  nature  of  the  pearlite  within  the  grains.  The  microscope  has  also  been  used  to  study 
and  photograph  scratch  extensometer  records  and  to  measure  the  radii  of  notching  tools 
used  to  make  notches  in  fatigue  specimens. 

A  typical  example  of  the  use  of  the  microscope  to  study  failures  is  shown  in  Fig.  18. 
The  straight  longitudinal  part  of  Fig.  18  (a)  was  known  to  be  the  origin  of  a  compound 
fissure  in  a  Bessemer  rail.  This  picture  is  a  group  of  three  photomicrographs  originally 
taken  at  100  X  magnification  and  here  reduced  to  about  33  X-  The  straight  edge  just 
above  the  inclusion  marked  A-B  represents  the  section  of  initial  failure.  At  the  right  end 
of  the  straight  section  the  horizontal  component  of  the  fissure  turned  down  in  the  rail 


Fig.  21.— Shatter  Crack  in  PearUte. 
Magnification   1,500  X.  Etch  2  percent  picral.  Note  that  the  shatter 
crack  is  very  irregular  and  has  branches  extending  in  various  directions, 
indicating  a  shattered  condition  of  the  steel. 


726 Investigation    of    Fissures    in    Railroad    Rails 

head.  This  portion  of  the  fissure  made  an  oblique  angle  with  the  polished  surface,  which 
makes  the  crack  appear  much  wider  than  it  would  on  a  surface  perpendicular  to  the 
crack.  If  a  straight  edge  is  laid  along  the  inclusions  C  and  D  in  Fig.  18  (a),  it  will  be 
seen  that  they  are  in  line  with  the  edge  where  the  fissure  started,  indicating  that  there 
has  been  an  inclusion  along  this  straight  section  of  the  fissure. 

Further  verification  of  the  above  explanation  is  shown  in  the  lower  photomicrograph 
marked  (b)  of  Fig.  18.  This  micrograph  was  taken  at  400  X  magnification  and  is  repro- 
duced here  at  130  X-  It  shows  the  large  inclusion  marked  A-B  in  micrograph  (a).  It 
will  be  noticed  that  there  is  a  narrow  band  of  ferrite  along  the  edges  of  this  inclusion. 
A  similar  band  of  ferrite  is  seen  along  the  edge  of  the  fracture  extending  the  full  length 
of  this  picture.  Also  at  /  there  is  a  small  fragment  of  the  original  inclusion  which  was  in 
this  space.  The  inclusion  marked  A-B  shows  numerous  cracks.  These  inclusions  are  quite 
brittle,  and  would  readily  crack  under  heavy  wheel  loads,  thus  acting  as  possible  start- 
ing points  for  fissures.  These  observations  indicate  that  this  fissure  started  in  a  hori- 
zontal direction,  in  or  along  a  rather  large  inclusion  in  the  highly  stressed  area  of  the  rail 
head.  This  fissure  as  it  spread  developed  into  a  compound  fissure  extending  toward  the 
center  of  the  rail  head. 

Four  typical  structures  of  rail  steel  are  shown  in  Fig.  19.  Figure  19  (b)  shows 
the  structure  commonly  found,  a  pearlitic  structure.  Figure  19  (a)  shows  a  structure 
infrequently  found,  in  which  there  is  a  slight  excess  of  ferrite  which  outlines  the 
original  austenite  grains  of  the  metal.  Figure  19  (c)  shows  a  structure  fortunately 
very  rarely  found,  in  which  there  is  an  excess  of  cementite  outlining  the  grains  of  the 
metal.  This  structure  indicates  unduly  brittle  steel.  Figure  19  (d)  is  a  micrograph  of  the 
typical  pearlitic  structure  magnified  1,100  times. 

Figure  20  shows  the  path  of  a  fatigue  crack  across  three  pearlitic  grains  of  steel.  It 
will  be  noted  that'  at  the  left  of  the  micrograph  the  crack  cuts  across  the  pearlite 
lamellae.  In  the  center  grain  it  extends  closely  parallel  to  the  grain  boundary,  while  in 
the  larger  grain  to  the  right  it  is  between  the  pearlite  lamellae.  It  has  been  found  that  in 
general  fatigue  cracks  progress  in  a  fairly  straight  line  perpendicular  to  the  direction  of 
the  principal  tensile  stress.  Figure  21  shows  a  shatter  crack  in  pearhte.  It  should  be  noted 
that  the  shatter  crack  is  very  irregular  and  has  branches  extending  in  various  directions. 
Such  cracks  are  well  named  as  they  represent  a  general  shattering  of  the  metal  in  the 
vicinity  of  the  crack.  In  general  it  may  be  stated  that  no  typical  structure  has  been 
associated  with  shatter  cracks  except  that  they  are  more  numerous  in  segregation  streaks 
which  usually  contain  more  non-metallic  inclusions  than  the  surrounding  rail  metal. 

VII  Mechanical  Properties  of  Rail  Steel 
By  S.  W.  Lyon 

37.  Introductory.— At  the  inception  of  the  Rails  Investigation  a  program  of 
mechanical  testing  of  specimens  cut  from  rails  was  carried  out  to  furnish  information 
regarding  the  properties  of  rail  steel.  While  many  of  the  tests  that  were  carried  out 
were  of  such  a  nature  as  to  give  information  to  supplement  the  findings  of  the  metal- 
lographic,  rolling-load,  and  other  tests,  the  later  mechanical  tests,  especially,  were  made 
with  the  purpose  of  enlarging  the  fund  of  data  regarding  the  behavior  of  rail  steel  as  an 
engineering  material  with,  of  course,  especial  attention  to  its  use  in  railroad  track. 

The  tests  which  comprised  the  earlier  part  of  the  program  were  mostly  concerned 
with  the  establishment  of  the  mechanical  properties  of  rail  steel  both  as  found  in  shatter- 
cracked  (as  determined  by  etch  tests)  and  in  non-shatter-cracked  rails.  Further  to  de- 


Investigation    of    Fissures   in    Railroad    Rails 727 

lineate  the  difference  between  the  various  properties  in  shatter-cracked  and  non-shatter- 
cracked  steel,  specimens  were  obtained  from  the  shatter-cracked  rails  from  areas  containing 
cracks  and  those  adjacent  in  the  same  rails  not  having  cracks  as  revealed  by  the  etch  test. 
The  many  rails  tested  included  hot-bed  cooled  rails,  control-cooled  rails,  normalized  or 
Brunorized  rails,  and  rails  of  special  composition ;  these  rails  also  included  various  weights 
and  types  of  section. 

When  the  program  of  the  Rails  Investigation  was  expanded  to  include  the  problem 
of  hardening  of  rail  ends  to  minimize  batter^"  a  great  many  mechanical  tests  of  specimens 
cut  from  rails  so  treated  were  made.  These  tests  were  made  on  rails  end  hardened  by 
11  processes  of  which  6  represented  mill  end-hardening  practice  and  5  practices  used 
to  end-harden  rail  ends  in  track.  Specimens  were  cut  and  tested  so  as  to  survey  the 
mechanical  properties  of  the  steel  as  affected  by  the  various  end-hardening  processes 
and  also  of  the  unhardened  rail  steel  to  give  a  comparison  of  the  effect  of  hardening. 

Besides  the  above  enumerated  more  or  less  routine  tests  carried  out  in  direct  relation 
to  the  specific  problems  of  transverse  fissures  and  the  end  hardening  of  rails,  certain 
special  tests  were  made.  These  special  tests  were  suggested  by  the  major  problems  and 
are  so  related  as  to  give  information  on  certain  phases  of  the  transverse  fissure  and  end 
hardening  problems.  Considerable  effort  was  given  to  the  determination  of  the  effect  of 
temperature,  especially  low  temperatures,  on  the  mechanical  properties  of  rail  steel.  In 
connection  with  the  end  hardening  of  rail  ends  much  work  was  done  on  the  effect  of 
hardness  on  rail  steel  as  to  tensile  strength,  ductility,  toughness,  and  fatigue  strength. 
Other  special  tests  were  also  made  on  the  effect  of  rolling  on  the  toughness  of  raQ  steel. 

Included  in  the  various  tests  applied  to  specimens  cut  from  rail  steel  to  study  the 
properties  of  rail  steel  were  static  tension  tests,  impact  bending  tests,  fatigue  tests,  impact 
tension  tests,  hardness  tests,  and  other  special  mechanical  tests  that  will  hereinafter  be 
described.  Certain  of  the  above  tests  were  applied  not  only  at  normal  room  temperature 
but  at  depressed  temperatures  to  as  low  as  — 60  deg.  F. 

38.  Static  Strength. — ^The  various  studies  of  the  static  strength  of  raU  steel  will  be 
discussed  under  two  main  classifications  which  included  the  following  outhned  features. 

(a)  Many  static  tension  tests  of  specimens  cut  from  rail  heads  were  made 
in  connection  with  shatter-cracked  and  non-shatter-cracked  rails  in  the  pursuit  of 
the  general  problem  of  the  cause  and  prevention  of  transverse  fissures  in  rails. 

(b)  In  connection  with  the  investigation  of  end-hardened  rails  many  tension 
tests  were  made  of  specimens  cut  from  the  end-hardened  and  unhardened  steel  in 
rail  ends  hardened  by  the  various  end-hardening  processes.  These  tests  were  made 
to  study  the  effect  of  the  hardening  on  the  steel  in  the  rails  so  treated. 

(a)  Static  Tension  Tests  of  Specimens  from  Head  of  Rail. — Static  tension  tests  were 
made  on  about  40  tension  specimens  cut  from  the  heads  of  certain  test  rails  in  the  first 
lot  received  (hot-bed  cooled  rails).  Rails  from  five  mills  were  in  this  first  lot.  These 
tension  specimens  were  all  from  rails  for  which  the  etch  test  specimens  showed  no  shatter 
cracks.  The  range  of  values  found  is  given  in  Table  12. 

Static  tension  tests  were  also  made  on  specimens  cut  from  the  heads  of  rails  for 
some  of  which  the  etch  test  had  shown  shatter  cracks.  The  type  of  tension  specimen  for 
this  second  lot  is  shown  in  Fig.  22  (a).  The  specimens  were  cut  so  as  to  provide  speci- 
mens from  (1)  the  metal  near  the  surface  of  rails,  and  (2)  from  the  steel  near  the 
center  of  the  cross-section  of  the  head. 


"  A  subsequent  report  will  discuss  the  tests  to  mea.sure  batter  on   rails  with  ends  unhardened  and 
with  ends  hardened. 


728 


Investigation    of    Fissures   in    Railroad   Rails 


U 


O  aj  oi 


H 

S 


CO  a;  C 


5g 


g 

O 

J3 

o 

4^ 

O 

&^ 

<1> 

a> 

ja 

n 

iz; 

11 

i) 

(U 

i- 

>i 

aj 

CV) 

o 

VI 

J3 

a< 

It 

r! 

>,  M 

u 

5?  c 

H 

o 

H 

B 
o 

u 

■M 

1 

s 

2  3 

3 

o 

H 

(J 
in 

H 

^ 

rt(I, 

s 

2 

X)    „ 

1 

J3 

to  OJ    ■ — I  .4^ 


^  o 

rt  >^  c  c 


§  r&? 


tn      (U  5  43  ^ 
^  ^  ^ 


> 


Qi 


t^ 


■Q. 


b^ 


^ 


-tJ  -tJ 

wj 

" 

^1  ^  c 

3j  (p  (u 

<D 
P. 

5 

.    U    }-, 

as.a 

rO 

: 

at 

O00(MO-* 

o 

o 

o    .    .oico 

o 

o 

6-z 

TtOS00(N     . 

o 

o 

to 

«5        '"'        '-' 

lO 

o 

►h  _ 

-<J< 

us 

t- 

(X 

o  o  o  o  o 

o 

o 

rO. 

-U  4->  -U  -1-3  -l-» 

-IJ 

->J 

O  O  (M  U3  lO 

o 

o 

OO 

O      .      .10U3 

o 

o 

oo 

Oi  t-(MiM      • 

o 

o 

OUn 

oo"     ^      ^ 

00 

(M 

oo 

(M 

■<a< 

«5 

oco 

>> 

o 

H 

!— I  "—I 

0) 

.&'t1 

o 

>-•  o 

pq^ 

:g 

-5    OJ 

pi 

n  M 

<io 

tf 

.s 

<D   el's 
^  o'-u 


s5- 


c  55 


Ol 

^     •=  0^  S  ^ 
c 


a    a    ss 


(U 


(Dry      (U      «5      fl 


3 


3 
-« 

fl 
H 


3  3 


CO 
(O 

QJ 

a 

a 


03 


<!)■ 


(U      r- 

3  g 

-f  CO    O) 

O)   tH  is 


=    .S 


-a 
o 


I    -i 

s'm  a  »-i 

§  ^  §.2 

§a§r 

X   S  X   C3 
03   S   C3   Ol 

aSa-^ 

•4-5  a>  -t->  Ol 
ota  o  2 

Jh    fl)    fn    m 


cS 


o 

ca 

(-1 

a 

P 

0) 

3 

CO 

bo 

S         S  HH  S 


-^ 

a 

aa 

a 

^ — N 

ca 

{«   03 

03 

,2  <u 

(M 

T3 

t3t3 

73 

j=|(M 

(M 

S 

S3  i=l 

c 

1-^ 

bfl 

i-H 

tHCCI 

CO 

mE 

ta 

o 

oo 

O 

3 


as 


tf     rt     tf 


O  t^ 
-or-     . 


Qc  ID 

0_ui  o 

o'B  a 


Investigati  on    of    Fissures   in    Railroad    Rails 


729 


(o)  -H_h'V  po^s"      p 


(b) 


^ 


\-r-^ 


RELIEVE  005" 

^"EDf^  2"  °^®^  LENGTH 
1    I  ]  V^^-^TENSION  SPECIMEN 


^RELIEVE  J,    ,<*■  piL^TAPER^PERI' 

,       ,    .      -«L_J ^=H-Y     >  .         ,^\        ROTATING  BEAM 


l(^\  CENTER  RELIEVED^     ,. 

\^l  orOfl-  TO   0.010    7     i 


CENTER  REl 
0  COe    TO   ( 


(d) 


(e) 


(f) 


■2j- 


■HN  (  '.     ■. 


iD 


-2i" 


-iJojM^r^ 


FATIGUE   SPECIMEN 


r  GAGE  LENGTH 
TENSION  SPECIMEN 


UNNOTCHED  CHARPY 
IMPACT   SPECIMEN 


>^45^ 

f-079"                  pO.OI*  R.             J 

- — I"     '(-      l"- 

x,-x,-x,a,-j^ 

IZOD 
SPECIMEN 
(NOTCHED) 


(g)  i 


HIGH  SPEED  FATIGUE 
SPECIMEN 


"H 


-1 PgQ) 


TENSION   IMPACT 
SPECIMEN 


-3"- 


Fig.  22. — Specimens  for  Mechanical  Tests  of  Strength  and  Ductility. 

Shatter  cracks,  if  present,  are  found  from  ^  to  54  in-  below  the  tread  of  a  rail. 
Hence  the  difference  between  the  physical  properties  of  specimens  from  the  center  of 
heads  and  those  near  the  surface  of  heads  of  rails,  in  one  case  having  shatter  cracks  and 
in  the  other  case  being  free  from  shatter  cracks,  should  give  information  on  the  effect  of 
shatter  cracks  on  the  strength  and  ductility  of  the  me^al.  Figure  23  gives  graphically  a 
summary  of  the  average  results  of  mechanical  tests  of  many  tests  on  specimens  from  a 
large  number  of  rails.  It  is  evident  that  there  is  a  distinct  difference  in  tensile  strength, 
reduction  of  area,  and  elongation  between  the  steel  in  the  center  of  the  heads  of  rails  in 
which  shatter  cracks  were  found  by  the  etch  tests,  and  the  steel  near  the  surface  of  such 
rails — a  much  larger  difference  than  was  found  in  rails  free  from  cracks.  The  results 
are  presented  on  a  percentage  basis  so  as  to  combine  results'  of  tests  from  various 
strength  rails  in  the  summary. 

(b)  Static  Tension  Tests  of  End-Hardened  Rail  Steel. — In  connection  with  the  gen- 
eral program  of  testing  of  end-hardened  rails,  mechanical  tests  of  specimens  from  rails 
end-hardened  by  11  different  processes  were  made.  Included  in  the  mechanical  test  sched- 
ule were  static  tension  tests  of  specimens  cut  from  the  end-hardened  and  unhardened  rails 
hardened  by  these  11  processes.  Descriptions  of  the  11  end-hardening  processes  are  given 
in  Table  13. 


730 


Investigation    of   Fissures   in   Railroad   Rails 


Table  13 
Summary  of  End-Hardening  Processes  Used  in  Tests  of  Rail  Steel 


Process 

No. 

Mill  or 
Track 

Method  of  Heating 

Method  of  Quenching 

1 
2 
3 
4 
5 
6 
7 

■     8 

Mill 
Mill 
Mill 
Mill 
Mill 
Mill 
Track 

* 

Track' 
Track 
Track 
Mill  or 
Track 

Reheated  by  electric  induction 
Reheated  by  gas  burner 
Quenched  from  rolling  heat 
Reheated  by  gas  burner 
Reheated  by  natural  gas  burner 

Track  machine-Oxyacetylene 

Warm  water 
Compressed  air 
Water  spray 
Water  spray 
Compressed  air  and  steam 

Conduction  of  heat  to  cold 
metal 

9 
10 
11 
12 

Free-held  oxyacetylene  torch 
Automatic  oxyacetylene  machine 
Oxy-propane  torch 

Oxyacetylene  torch 

Water  sprinkler 
700  cc.  of  water 
One  pint  of  water 

Compressed  air 

*  Process  8  used  with  built-up  ends  of  rails.  No  tests  of  material  reported. 

Figure  22  (c)  shows  the  type  of  static  tension  test  specimen  cut  from  the  end- 
hardened  rails  hardened  by  the  6  mill-hardening  processes.  The  relatively  shallow  depth 
and  short  length  of  end-hardened  material  produced  in  the  rail  samples  by  the  5  track 
end-hardening  processes  precluded  obtaining  tension  specimens  for  those  rails. 

Figure  24  is  a  summary  of  the  static  tension  test  results  on  the  mill  end-hardened 
rails.  Each  test  value  compared  for  any  one  process  is  the  average  of  three  or  more  test 
results  on  specimens.  While  tension  test  results  were  obtained  from  other  zones  of  the 
end-hardened  rails  only  the  data  obtained  from  the  specimens  cut  from  the  portions  of  the 
rail  heads  adjacent  to  the  tread  of  the  rail  were  used  for  comparison,  as  these  results 
were  judged  to  be  typical  and  no  unusual  data  were  obtained  from  the  other  zones 
investigated. 

Examination  of  Fig.  24  shows  that  all  of  the  mill  end-hardened  rails  show  increased 
tensile  strength,  elongation,  and  reduction  of  area  values  for  the  end-hardened  material 
as  compared  to  the  unhardened  steel.  In  view  of  the  increased  hardness  of  the  end- 
hardened  steel  the  increased  ductility  as  shown  by  the  elongation  and  reduction  of  area 
data  is  somewhat  surprising.  However,  this  improvement  of  ductility  can  be  accounted 
for  by  the  improved  microstructure  of  the  hardened  steel  brought  about  by  the  heat 
treatment  imposed  by  the  processes  of  end-hardening.  Examination  of  end-hardened 
microstructures  shown  in  AREA  Proceedings,  Vol.  37  (1936)  page  645,  and  Vol.  39  (1938) 
page  816,  offers  substantiating  evidence. 

39.  Energy  Strength  (Resistance  to  Impact) 

(a)  Tests  of  Specimens  from  Vncracked  Rails. — Izod  impact  tests  of  notched  speci- 
mens were  made  on  specimens  cut  from  the  heads  of  certain  test  rails  in  the  first  lot  of 
rails  (hot-bed  cooled)  received.  The  range  of  values  for  energy  of  fracture  is  given  in 
Table  12.  The  rails  from  which  these  specimens  were  cut  were  free  from  shatter  cracks, 
as  shown  by  etch  tests. 

(b)  Transverse  Fissure  Studies. — ^When  the  program  of  mechanical  testing  was 
started  in  conjunction  with  the  early  work  on  transverse  fissured  rails  many  impact  tests 


Investigation    of    Fissures    in    Railroad    Rails 


731 


Fig.  23.— Results  of  Mechanical  Tests  of  Specimens  of  Rail  Steel. 


were  made  on  specimens  cut  from  shatter-cracked  and  sound  rails.  The  first  impact 
tests  which  were  made  were  carried  out  on  the  Charpy  223-ft.  lb.  capacity  machine  in 
the  Talbot  laboratory,  using  standard  bending  specimens  with  notch  imposed.  The  resist- 
ance to  fracture  as  measured  by  absorption  of  energy  during  fracture  gave  values,  even 
for  sound  rail  (1  to  3-ft.  lb.),  that  were  so  small  that  the  test  was  unsatisfactory  as  a 
method  of  differentiating  between  the  test  values  obtained  for  shatter-cracked  rails  and 
sound  rails.  Consequently  the  unnotched  specimen  shown  in  Fig.  22  (d)  was  used  as  it 
provided  a  specimen  which  absorbed  for  sound  rail  steel  approximately  100-ft.  lb.  of 
energy  during  fracture.  The  unnotched  specimens  besides  providing  a  specimen  better 
suited  for  differentiating  between  shatter-cracked  and  sound  steel  was  also  considered  as 
giving  a  better  measure  of  the  toughness  of  the  steel  rather  than  a  test  of  a  notched 
specimen  which  shows  the  effect  of  the  particular  notch  imposed  on  the  specimen. 

Figure  23,  sixth  column,  gives  a  graphical  summary  of  a  large  number  of  Charpy 
impact  bending  tests  made  on  unnotched  specimens  machined  from  many  rails.  The 
specimens  were  cut  from  these  rails  so  that  impact  energy  strength  values  were  obtained 
for  the  metal  in  the  rail  heads  both  at  the  outside  or  tread  surface  of  the  rails  and  of 
the  metal  within  the  head  at  the  zone  where  shatter  cracks  form.  The  rails  tested  in- 
cluded shatter-cracked  and  sound  rails  of  various  weights  and  sections;  these  rails  also 
included  rails  hot-bed  and  control  cooled.  Examination  of  the  sixth  column  of  Fig.  23 
shows  that  while  for  both  sound  and  shatter-cracked  rails  the  metal  from  the  inside  of 
the  head  showed  lower  impact  values  this  difference  in  the  shatter-cracked  rails  was 
much  more  pronounced. 

(c)  End-Hardened  Rails. — Included  in  the  general  program  of  testing  of  end- 
hardened  rails,  impact  energy  tests  were  made  on  specimens  cut  from  the  various  rail 
samples  hardened  by  the  processes  described.  The  impact  tests  served  as  a  measure  of 
the  energy  strength  of  these  rails  and  were  made  as  a  part  of  the  program  of  mechanical 
testing. 

Two  types  of  impact  tests  were  included  in  the  program  of  testing.  Charpy  impact 
bending  tests  were  made  from  the  hardened  and  unhardened  material  of  the  end-hardened 
rail  samples;  the  unnotched  type  of  specimen  shown  in  Fig.  22  (d)  was  used.  Besides 
the  Charpy  tests,  notched  Izod  bending  tests  were  made.  Figure  22  (e)  gives  the  details 


732 


Investigation    of    Fissu  res   i  n    Railroad   Rails 


g|         HARDENED 

TENSILE 

STRENGTH 

IN 

ELONGATION 
4   DIAMETERS 

REDUCTION 

OF 

AREA 

-ll        UNHARDENED 

P  S   1    X    IWOO 

o      S     §      8    i 

PER  CENT 
o       tfi       2       C       8     c3 

PER  CENT                     1 
o      2     S      S      ?    Sl 

PROCESS    1 
131  LB.  RAIL   MILL    B 

166  000 
139  000 

15,0 

e.o 

^^^r 

41   3 
17  0 

^^- 

1 

PROCESS  2 
112  LB.  RAIL   MILL  C 

140  100 
134   100 

- 

^ 

u 

16.0 
12.0 

^^ 

^^ 

^^ 

' 

41   1 
21    1 

^^ 

1 

} 

PROCESS  2 
112  LB    RAIL  MILL  D 

159  000 
143   800 

- 

II  0 
80 

38   1 
2i   3 

— 

__ 

PROCESS   2 
131  LB    RAIL  MILL  D 

176  300 
137   100 

^ 

1 

e.3 

70 

36   1 
18  3 

■■^^^ 

■ 

■ 

7777777t 

PROCESS  2 
131  LB    RAIL   MILL   E 

177  900 
136  300 

1 

8.0 
7.0 

29  4 

14  5 

Y?^^ 

■■ 

^ 

y 

V777/ 

Wf 

" 

PROCESS    3 
131  LB    RAIL    MILL    1 

180  400 
137   500 

^  ^ 

H  H 

_ 

1 

8  0 
7  5 

I^H  ^B 

23  1 

17   1 

■ 

^7^7777 

TTTT 

VTTTT^ 

'/////A 

PROCESS  4 
131  LB    RAIL   MILL    1 

190  600 
147  600 

^  ^ 

_ 

_ 

10.0 
70 

^^ 

36  6 
16  2 

^^ 

^ 

^777^777 

7777, 

7777^ 

PROCESS  5 
112  LB    RAIL  MILL   F 

162  200 
133  000 

1 

10  0 
90 

32  8 
19  4 

■ 

1 

W 

w< 

^^ 

w 

^77777^ 

PROCESS  6 
II?   LB    RAIL  MILL   D 

166  500 
139  400 

J- 

1 

L_ 

88 
76 

^_ 

27  5 
21  5 

"F 

VTTTTTT 

^7777777^ 

if  1  11 

\           ^ 

Fig.  24. — Results  of  Static  Tension  Tests  of  Specimens  from  End-Hardened  Rails. 


of  the  specimen.  The  Charpy  and  the  Izod  impact  tests  were  made  on  the  rail  samples 
from  the  rails  end-hardened  by  the  6  mill-hardening  processes.  As  previously  explained 
the  amount  of  end-hardened  material  produced  by  the  5  track-hardening  processes  was 
only  sufficient  to  furnish  material  for  the  unnotched  Charpy  tests.  The  Charpy  specimens 
were  tested  on  a  223-ft.  lb.  capacity  Charpy  impact  machine  and  the  Izod  specimens  on 
an  Olsen^Izod  machine  of  10-ft.  lb.  capacity. 

Figure  25  gives  a  graphical  summary  of  the  results  of  the  Charpy  impact  tests  on  the 
mill  end-hardened  and  track  end-hardened  rails  and  on  the  Izod  tests  on  the  mill  end- 
hardened  rails.  The  effect  of  all  of  the  end-hardening  processes  was  to  improve  the 
energy  strength  or  toughness  of  the  end-hardened  material  as  compared  to  the  unhard- 
ened  rail  steel.  The  increase  of  toughness  with  increase  of  hardness  of  the  end-hardened 
steel  was,  as  in  the  case  of  the  increased  ductility  for  the  end-hardened  material  in  the 
tension  tests,  an  unexpected  result.  This  increase  of  toughness  with  hardness  can,  how- 
ever, be  explained  by  the  improvement  of  microstructure  brought  about  by  the  heat 
treatment  imposed  on  the  steel  by  the  end-hardening  processes. 

40.  Fatigue  Strength 

(a)  Tests  oj  Polished  Specimens. — Fatigue  tests  of  polished  specimens  cut  from  the 
heads  of  certain  test  rails  in  the  first  lot  of  test  rails  received  were  made.  These  rails 
were  free  from  shatter  cracks,  as  shown  by  the  etch  test.  The  ranges  of  values  for  endur- 
ance limits  under  various  ranges  of  stress  are  given  in  Table  12. 

The  metal  below  the  surface  of  the  head  of  a  rail  is  presumably  free  from  surface 
defects  and,  unless  the  rail  is  shatter  cracked,  from  internal  notch  effects.  Fatigue  tests 
of  polished  specimens  in  which  surface  effects  and  notch  effects  are  minimized  would 
seem  to  give  significant  results  for  the  metal  inside  the  head  of  such  a  rail. 

(b)  Effect  of  Shatter  Cracks.— hi  the  inception  of  the  investigation  of  transverse 
fissures  in  railroad  rails  and  the  accompanying  problem  of  the  effect  of  shatter  cracks 


Investigation    of    Fissures   in    Railroad    Rails 


733 


MILL  HARDENED    RAK  S 


FIELD  HARDENED  RAILS 


CHARPY  TEST 
(UNNOTCHED) 

ENERGY  -  FT  LB 
0  100         200 


IZOD    TEST 
(NOTCHED) 
ENERGY-  FT    LB. 
0      2       4      6      8 


CHARPY   TEST 

(UNNOTCHED) 

ENERGY  -  FT    LB 

RAIL  NO    0         100      200     300     400  SCO 


Fig.  25. — Results  of  "Energy  Strength"   (Impact)   Tests  of  Specimens 
from  End-Hardened  Rails. 

in  rails,  many  fatigue  tests  were  carried  out  on  specimens  cut  from  shatter-cracked  and 
sound  rails.  The  specimens  were  so  machined  as  to  select  material  from  the  outside 
metal  of  a  rail  head  and  from  the  inside  metal  of  the  head  where  shatter  cracks  are 
found.  By  testing  specimens  from  these  locations  in  both  sound  and  shatter-cracked  rails 
a  measure  of  the  effect  of  shatter  cracks  on  the  fatigue  strength  of  rail  steel  was 
determined. 

Figure  22  (b)  shows  the  type  of  fatigue  specimen  used  in  the  earlier  tests.  These 
specimens  were  tested  in  a  rotating-beam  type  of  testing  machine  which  subjected  the 
specimens  to  cycles  of  completely  reversed  bending  stress.  Figure  23,  fifth  column,  gives  a 
graphical  summary  of  the  effect  of  shatter  cracks  on  the  fatigue  strength  determined  for 
the  steel  from  the  heads  of  shatter-cracked  and  sound  rails.  The  rails  from  which  the 
specimens  were  machined  included  rails  of  several  different  sections  and  weight,  hot-bed 
cooled,  box  cooled,  normalized,  and  from  some  alloy-steel  rails.  Examination  of  these 
summarized  results  shows  that  the  fatigue  strength  of  the  metal  from  the  inside  of  the 
heads  of  shatter-cracked  rails  was  less  than  60  percent  of  that  of  the  outside  metal  of  the 
same  rails.  As  the  fatigue  strength  of  the  metal  of  the  inside  of  head  (cracked  area)  was 
the  only  material  appreciably  weaker  than  the  outside  metal  of  the  sound  rail,  the 
shatter  cracks  can  be  assumed  to  be  the  cause  of  the  lessening  of  the  fatigue  strength 
of  the  material  in  the  steel  from  that  location. 

41.  "Damage  Line"  for  Rail  Steel.— The  damaging  effect  of  occasional  high 
stresses  on  the  steel  in  rails,  caused  by  service  loads  of  abnormal  magnitude,  was  studied 
in  connection  with  the  transverse  fissure  problems.  The  development  of  high-speed 
fatigue  machines  in  the  Talbot  laboratory  and  the  then  new  "damage  line"  method  pro- 
posed by  Mr.  H.  J.  French"  of  the  International  Nickel  Company  for  determining  the 


"  French,  H.  J. — Fatigue  and  Hardening  of  Steel,  Trans.  Am.  Soc.  Steel  Treating,  Vol.  21,  p.  899 

(1933). 


734 


Investigation    of    Fissures   in    R  ailroad   Rails 


effect  of  occasional  high  stresses  in  metals  furnished  a  means  of  studying  the  effect  of 
occasional  overloads  on  rail  steel.  Considerable  work  was  done  on  the  determination  of 
damage  lines  for  rail  steel  in  the  shatter  cracked  and  sound  condition. 

The  damage-hne  method  as  used  for  determining  the  effect  of  occasional  high  stresses 
in  rail  steel  can  be  best  described  by  following  through  a  typical  determination  of  such 
a  diagram.  Figure  26  shows  a  graph  of  a  typical  damage-line  test  for  rail  steel.  First  a 
series  of  fatigue  tests  is  run,  an  S-N  (stress  cycle)  diagram  drawn,  and  from  that  dia- 
gram the  endurance  limit  of  the  original,  unstressed  metal  determined.  Then  a  number  of 


® 


_©._' 


© 


fENOURANCE     LIMIT 
4  OF  "AS  ROLLED"  METAL 
Ue  000    P.  S 


GIVEN   1300   CYCLES  OF   ±78  000    P  S    I        I 
DID   NOT   FRACTURE    UNDER    10  000  000" 
SUBSEQUENT   CYCLES   OF   ±66  000   PS.  I. 


-H- 


-I — h-l-t- 


I     I    I   I 


GIVEN  2000  CYCLES  OF  ±78  000  P.S.I. 
FRACTURED  UNDER  SUBSEQUENT 
CYCLES  OF  ±66  000  PS  I   I  I 

J I  I  I  I L 


GIVEN   4200    CYCLES  OF   ±75  000   PS.  I 
I    DID   NOT  FRACTURE   UNDER    10  000  000 

SUBSEQUENT  CYCLES   OF   ±  66  000   P  S.I 
III           I          I      I    I   I           I          I      I    I    I 
GIVEN  5200   CYCLES  OF  ±75  000   P.S.I.- 
I    FRACTURED   UNDER   SUBSEQUENT    I 
_     CYCLES   OF   ±66  000   P  S  I.        I     I    

I      I      I    I  I  I      I      I    I  M 

GIVEN  75000  CYCLES  OF  ±69  000  PS  I 
DID  NOT  FRACTURE  UNDER  10  000  000 
SUBSEQUENT   CYCLES    OF   ±66  000  PS 


1— n 1 — I — m 1 — I — m — 

GIVEN    no  000  CYCLES   OF   ±69  000  PS  I 
FRACTURED   UNDER    SUBSEQUENT 
CYCLES   OF    ±66  000    PS  I        | 

J_JJ I L 


OOOO  100000  I  MILLION 

CYCLES    OF  REVERSED    FLEXURE 

Fig.  26. — "Damage  Line"  Test  for  Specimens  of  Rail  Steel. 

Rail  102S.  Hot-bed  cooled.  Etch  test  showed  shatter  cracks.  Tested 

at  air  temperature,  approximately  70  deg.  F. 


specimens  are  subjected  to  definite  stresses  above  this  endurance  hmit  and  are  run  for  a 
certain  number  of  cycles  of  stress.  In  Fig.  26  detailed  results  are  shown  for  three  pairs 
of  specimens  subjected  to  cycles  of  reversed  flexure  at  stresses  above  the  endurance 
limit  of  the  original  unstressed  material.  After  undergoing  this  overstress  the  specimens 
are  then  subjected  to  cycles  of  stress  equal  to  the  endurance  Umit  of  the  original  metal. 
Points  on  the  "probable  damage  hne"  are  located  between  the  plotted  point  of  that 
specimen  of  a  pair  which  fails  under  this  stressing  at  the  endurance  limit  of  the  original 
metal  and  the  plotted  point  for  the  specimen  which  does  not  fail. 

It  has  been  proposed  by  H.  W.  Russell  of  the  Battelle  Memorial  Institute"^  that,  as 
an  arbitrary  measure  of  resistance  to  occasional  overstress,  there  may  be  used  the  ratio 
Sd  :  Sf,  in  which  So  is  the  "damage  line  stress"  for  25,000  cycles  and  5f  is  the  endurance 


^  Russell,   H.  W. — Damage  and  Overstress  in   the  Fatigue  of   Ferrous  Metals,   ASTM   Proceedings. 
Vol.  36,  Part  II,  p.  118   (1936). 


Investigation    of    Fissures   in    Railroad   Rails 


735 


RAIL 

THERMAL 
TREATMENT 

TEST 
TEMP 

OTHER              DAMAGE 

SPECIAL      Sn/Sc  FOR 

FEATURES                   OF 

?,   ,   ,    ,9iS|   , 

RESISTANCE 
25  000   CYCLES 
STRESS 

10                  IS 

651 
653 
453 
668 

HOT   BED 
HOT  BED 
HOT   BED 
HOT  BED 

70 
70 
70 
70 

SHATTER  CRACKS 
UNCRACKED 

SHATTER  CR«XS 
UNCRACKED 

■ 

m 

■ 

" 

" 

; 

" 

_ 

" 

^ 

■ 

™ 

1121 

HOT  BED 

70 

10 

-20 

-40 

3% 
CHROMIUM 
UNCRACKED 

.. 

_ 

" 

* 

^ 

F 

t: 

" 

p 

F 

! 

1013 

HOT  BED 

70 

10 

-20 

-40 

UNCRACKED 

::::::::::3 

d 

3 

■ 
1 

1014 

CONTROL  - 
COOLED 

70 

10 

-20 

-40 

UNCRACKED 

"■ 

1 

z 

1025 

HOT  BED 

70 

10 

-20 

-40 

MANY 
SHATTER 
CRACKS 

1026 

NORMALIZED 

70 

10 

-20 

-40 

VERY  FEW 
SHATTER 
CRACKS 

^ 

_ 

^ 

^ 

^ 

^ 

^ 

^ 

* 

IIIIIIIII.J 

NOTCHED    S 

'EGIM 

ENS 

1013 
1014 
1025 
1026 

HOT  BED 
CONTROL  COOL'D 

HOT    BED 
NORMALIZED 

70 

10 

-20 

-40 

UNCRACKED 

UNCRACKED 

SHATTER  CRACKS 

FEW  CRACKS 

- 

_ 

1 

" 

" 

* 

" 

" 

" 

1 

" 

" 

" 

" 

" 

" 

" 

" 

" 

" 

" 

" 

5 

" 

5 

^ 

^ 

■ 

* 

* 

^ 

^ 

* 

* 

■ 

OTHER  STEELS                                                                               1 

SAE  I02C 

AS  ROLLED 

70 

10 

-20 

-40 

■ 

SAE  313! 

HEAT  TREATED 

70 

- 

- 

± 

- 

i 

- 

- 

- 

= 

1 

^ 

^ 

_ 

_ 

T 

_ 

■ 

_ 

_ 

_ 

5 

Fig.  27. — Results  of  "Damage  Line"  Tests  of  Specimens  of  Rail  Steel. 


limit  of  the  original  unstressed  metal.  In  Fig.  26  Russell's  ratio  would  be 
73,000  :  66,000  =  1.11. 

In  Fig.  27  values  of  Russell's  "damage  resistance  ratio"  have  been  plotted  from 
test  results  for  specimens  from  various  rails.  Although  values  for  these  ratios  for  low 
temperature  tests  are  shown,  the  items  designated  as  run  at  +70  deg.  F.  are  the  ones 
under  discussion.  It  will  be  noted  that  no  outstanding  variation  of  this  ratio  was  found 
in   rail   steel    (1)    between   specimens   from   shatter-cracked   and   from    uncracked   rails, 

(2)  between  specimens  from  hot-bed  rails  and  from  control-cooled  or  normalized  rails, 

(3)  between  specimens  of  ordinary  rail  steel  and  of  3  percent  chromium  steel.  Notched 
specimens  showed  high  values  of  this  ratio,  although  they  developed  an  endurance  limit 
only  about  50  percent  of  that  developed  by  unnotched  specimens. 

42.  Fatigue  Strength  of  End-Hardened  Rail  Steel. — In  connection  with  the 
program  of  mechanical  testing  on  end-hardened  rails  the  variation  of  fatigue  strength 
of  the  rails  was  "explored"  by  determining  the  endurance  limits  for  the  steel  from  speci- 
mens machined  from  the  hardened  steel,  the  unhardencd  steel,  and  from  specimens  ob- 
tained from  the  transition  zone  between  the  hardened  and  unhardened  material.  The 
small  type  of  fatigue  specimen  shown  in  Fig.  22  (f),  tested  in  a  fatigue  machine  running 
at  approximately  8,000  r.p.m.,  was  used.  Figure  28  gives  the  results  of  the  fatigue  tests 


736 


Investigation   of    Fissures   in    Railroad   R ails 


MILL  END-HARDENED   RAILS                   | 

a 
z 
u 
o 

lU 

HARDENED 

FATIGUE    STRENGTH 

P.S.I.  X  1000 

o     8      ?     S     g    i 

V///////////} 
UNHARDENED 

PROCESS   1 
131  LB.  RAIL  MILL   B 

94  000 
62  000 

_ 

1 

PROCESS  2 
112  LB.  RAIL   MILL  C 

75  000 
62  000 

. 

^ 

. 

. 

. 

. 

k 

PROCESS  2 
112  LB.  RAIL  MILL  D 

85  000 
63  000 

^ 

_ 

_ 

md 

7777777 

777T 

PROCESS   2 
131  LB.  RAIL  MILL  D 

90  000 
62  000 

_ 

X 

_ 

m 

■ 

Y///////// 

r 

PROCESS  2 
131  LB.  RAIL  MILL   E 

89  000 
63  000 

- 

- 

. 

m 

. 

_ 

^ 

_ 

>}}}}}}}}}}\ 

1    1    1    1  1   1 

PROCESS    3 
131  LB.  RAIL  MILL    1 

NO  TEST 
INSUFFICIENT  DATA 

PROCESS  4 
131  LB.  RAIL  MILL    1 

84  000 
60  000 

1     1     1     II 

_ 

_ 

1 

Y777777777/ 

PROCESS  5 
112  LB.  RAIL  MILL   F 

90  000 
60  000 

_ 

_ 

_ 

_ 

1 

^ 

^ 

^ 

^ 

■ 

PROCESS  6 

82  000 
65  000 

■ 

m 

1 

V 

3 

3 

V 

w 

w 

W 

i    1    1    1   1    1 

Fig.  28. — Results  of  Fatigue  Tests  of 
Hardened  Metal  from  Rails  End- 
Hardened  at  the  Mill. 


of  specimens  from  the  hardened  and  unhardened  material  from  the  rails  end  hardened  h  • 
the  six  mill  end-hardening  processes.  The  results  of  the  transition  zone  specimens  are 
not  given  as  no  unusual  results  were  found.  Figure  28  shows  that  in  all  cases  the  end- 
hardened  material  gave  higher  values  of  fatigue  strength  than  did  the  unhardened  rail 
steel.  These  results  are  in  line  with  the  findings  for  tensile  strength  test  results  and 
impact  test  results. 

43.  Hardness  and  its  Effect  on  Tensile  Strength,  Ductility,  Toughness, 
and  Fatigue  Strength  of  Rail  Steel. — The  application  of  the  various  end-hardening 
processes  to  railroad  rails  to  produce  a  hardened  condition  in  the  rail  ends,  thereby  better 
to  resist  battering  action  at  rail  joints  under  traffic  in  track,  consists  essentially  of  the 
practical  application  of  the  principles  of  heat  treatment  to  rail  steel.  Any  study  then, 
which  has  for  its  purpose  the  determination  of  the  most  desirable  mechanical  properties 
to  be  attained  in  the  hardened  material  of  end-hardened  rails  so  as  to  best  resist  batter, 
resolves  itself  into  a  study  of  the  effect  of  heat  treatment  on  the  mechanical  properties  of 
rail  steel. 

Consequently  to  provide  such  studies  of  the  effect  of  hardness  on  the  tensile  strength, 
ductility,  toughness,  and  fatigue  strength  of  rail  steel  a  laboratory  method  of  study  was 
carried  out  as  follows:  Specimens  were  cut  from  unhardened  test  rails,  heat  treated  to 
produce  any  desired  range  of  hardness,  and  then  tested  to  give  the  desired  information 
regarding  the  various  properties.  Tension  specimens,  Fig.  22  (c)  were  prepared  and  tested 
to  study  the  variation  of  tensile  strength,  percentage  elongation,  and  percentage  reduc- 
tion of  area;  also,  variation  of  toughness"  (Tension-Energy)  by  measuring  the  areas  of 


'"'  The  term  toughness  is  used  to  denote  energy  required  to  fracture  a  metal. 


Investigation    of    Fissures   in    Railroad   Rails 


737 


30  AO  50 

ROCKWELL    C    HARDNESS 


Fig.  29. — Variation  of  Tensile  Strength,  Elongation,  Reduction 
of  Area,  Energy  for  Fracture  and  Fatigue  Strength  with  Varying 
Rockwell  "C"  Hardness.  Rail  1100,  131-lb. 


the  stress-strain  diagrams  was  obtained.  Impact  bending  tests  of  unnotched  bars 
(Fig.  22  (d))  and  impact  tension  tests  (Fig.  22  (g))  gave  data  to  determine  the  variation 
of  toughness  with  hardness  changes.  Fatigue  tests  of  unnotched  bars  (Fig.  22(f))  were 
also  made  and  the  data  gave  variation  of  fatigue  strength  with  hardness.  Adequate  Rock- 
well "C"  hardness  readings  were  obtained  on  all  specimens  prior  to  testing. 

After  the  various  specimens  were  rough  machined  from  the  test  rails,  allowance  hav- 
ing been  made  for  final  finish,  they  were  heat  treated  and  then  ground  to  finished  dimen- 
sions. The  general  procedure  of  heat  treatment  was  to  quench  all  specimens  to  obtain 
maximum  hardness,  followed  by  suitable  draw  to  obtain  the  desired  hardness. 

Figure  29  presents  the  results  of  these  tests.  E.xamination  of  these  results  will  show 
that  in  the  hardness  range,  Rockwell  "C"  48  to  "C"  52,  a  rather  distinct  change  occurs 
in  all  of  the  curves  of  the  various  properties  shown.  The  tensile  strength  and  fatigue 
strength  curves  reach  their  peak  in  this  hardness  range  while  all  the  curves  of  toughness 
(energy  strength)  and  ductiUty  (reduction  of  area  and  elongation)  drop  off  abruptly. 
These  results  would  indicate  that  the  usable  hardness  of  rail  steel  is  exceeded  when  a 
hardness  of  approximately  Rockwell  "C"  SO  (Brinell  465)  is  exceeded.  It  should  also  be 
noted  that  as  the  hardness  decreases  the  toughness  and  ductility  increase. 


738 Investigation    of    Fissures   in    Railroad    Rails 

The  above  results  would  seem  to  furnish  a  rather  direct  guide  for  end-hardening 
practice  in  that  the  hardened  material  in  end-hardened  rails  is  a  rather  carefully  heat- 
treated  rail  steel.  It  would  therefore  be  reasonable  to  assume  that  the  toughness  in  end- 
hardened  material  would  be  subject  to  the  same  hmitations.  In  other  words  it  is  indi- 
cated that  the  upper  limit  of  Rockwell  "C"  hardness  to  be  attained  in  end-hardening 
practice  should  not  exceed  a  value  of  "C"  45  (or  Brinell  415).  Also,  as  heat-treated  rail 
steel  develops  good  toughness  for  hardnesses  below  "C"  45  it  is  evident  that  the  lower 
limit  of  end-hardening  practice  would  not  be  set  by  toughness  considerations.  The 
rolling-load  tests  (and  service  tests)  indicate  that  hardnesses  in  end-hardened  rails  below 
"C"  35  (Brinell  320)  are  not  effective  in  preventing  wear  and  batter.  Briefly  then,  the 
limits  of  hardness  seem  to  be  set  on  the  high  end  by  toughness  considerations  and  on  the 
lower  end  by  batter  and  wear  considerations.  The  laboratory  tests  then  indicated  a  satis- 
factory hardness  range  between  "C"  35  and  "C"  45,  (approximately  Brinell  320  to  415). 

44.  Effect  of  Temperature. — A  considerable  study  of  the  effect  of  temperature 
on  the  properties  of  rail  steel  was  made  as  it  is  a  matter  of  common  railroad  experience, 
especially  in  the  northern  United  States  and  Canada,  that  rail  failures  are  more  frequent 
in  cold  weather  than  in  warm  weather.  Two  general  types  of  explanation  for  this  have 
been  offered:  (1)  Changed  track  conditions  due  to  low  temperatures  and  to  freezing  and 
thawing,  and  (2)  changes  in  the  physical  properties  of  rail  steel  at  low  temperatures.  It 
was  to  provide  data  to  investigate  the  second  of  the  two  reasons  given  above  that  the 
various  studies  of  the  effect  of  low  temperature  on  rail  steel  were  carried  out. 

The  studies  which  were  made  fall  into  three  divisions:  (1)  tests  of  specimens  cut 
from  rail  steel  were  tested  at  low  temperatures  and  at  room  temperatures  to  determine 
the  change  of  tensile  strength,  fatigue  strength,  ductility  and  toughness  of  rail  steel, 
(2)  tests  at  low  temperatures,  using  the  "damage  line"  method,  to  study  the  weakening 
effect  of  occasional  periods  of  overload,  and  (3)  tests  to  determine  the  effect  of  hardness 
on  the  toughness  of  rail  steel  with  variation  of  temperature  of  testing.  The  first  two  series 
of  tests  were  made  possible  through  the  very  generous  aid  of  the  U.  S.  Air  Service  in 
allowing  the  use  of  a  cold  room  at  Wright  Field,  Dayton,  Ohio.  The  third  series  of  tests 
was  made  in  the  Talbot  laboratory  at  the  University. 

(a)  Physical  Properties  of  Rail  Steel  at  Low  Temperatures. — Fatigue  tests,  tensile 
tests,  Brinell  tests  and  impact  tests  of  numerous  specimens  from  three  rails  were  run  in 
the  cold  room  with  minimum  temperatures  of  — 40  deg.  F.  for  all  tests  and  of  — 53  deg.  F. 
for  impact  and  tensile  tests.  Tests  were  run  both  on  standard  specimens  and  on  notched 
specimens.  Figure  30  shows  a  summary  of  the  results  of  the  tests,  from  which  it  will  be 
noted  that  the  tensile  strength  of  unnotched  specimens  increased  as  temperature  decreased 
to  about  zero  Fahrenheit,  and  then  decreased  with  further  decrease  of  temperature  for 
steel  from  two  rails  and  increase  in  strength  for  the  steel  from  the  third  rail.  Notched 
tensile  specimens  showed  decrease  of  strength  with  decrease  of  temperature.  Fatigue 
strength  of  unnotched  specimens  increased  with  decrease  of  temperature,  while  fatigue 
strength  of  notched  specimens  changed  but  little  with  decrease  of  temperature.  At  the 
lower  temperatures  the  rail  steel  tested  seemed  more  sensitive  to  notch  effect  than  at 
higher  temperatures. 

Also  shown  in  Fig.  30  are  the  results  for  ductiUty  and  impact  or  energy  strength. 
Elongation,  reduction  of  area,  Izod  value  for  notched  specimens  and  (most  marked 
effect)  Izod  value  for  unnotched  specimens,  all  show  marked  decrease  for  lowering  of 
temperature.  A  high  impact  test  value  is  a  point  in  favor  of  a  steel. 

Of  the  three  rails  from  which  specimens  were  taken,  Rail  1017  was  a  hot-bed  cooled 
rail  in  which  etch  tests  had  shown  shatter  cracks.  Rail  1018  was  a  companion  rail  slow- 


Investigation    of    Fissures    in    Railroad    Rails 


739 


FATIGUE  LIMIT(NOTCHFn) 


RAIL   1017 


'mrfffirW 


RAIL  1018 


LEL 


RAIL  1063 


ROOM   TEMPERATURE  -  OEGrIeS    EAH*ENHEIT 


^80 

-r- 

-p 

~ 

[T 

V- 

S 
$60 

0 

a 

/ 

S 

«<J 

^^ 

|«0 

i 
/ 

y 

$20 

o 

i* 

1 

■» 

.-- 

.^ 

ot^ 

s  • 

o 
.$2.9 

^2.0 

^^ 

9* 

j„; 

.n^ 

i" 

? 

rrS 

irr 

M 

y 

[^ 

t' 

(' 

1^ 

!?i^ 

t^* 

".d 

? 

RAIL  I0I7| 

o 

Q    O 

II 

Mill 

8  a 

l« 

0 

«« 

r 

lf__ 

^1— 

-€-— 

o#    _:_ 

'  y 

y  .^^ 

•iirJa:::::: 

— 1  Si^                   ^ 

^^A  ^E  l*  "  Si-h 

\^^^^ 

•J   r  T 

/       RAIL  1018 

., \      '  i' '  '  .15 

—V-  s 

-^^-  £ 

%%  —  ' 

42 

?— -  ^ 

\/ 

< 

f( 

o 

7         1 
v'           0 

.^^^'"^ 

S=; 

*M 

^::3g5'^« 

^ 

s 

RAIL 

1063           t 

!»               li 

^.-4 

ROOM  TEMPERATURE  -  0E8REE8    FAHRENHEIT 

Fig.  30. — Strength  and  Ductility  Properties  of  Rail 
Steel  at  Low  Temperatures. 


cooled,  in  which  no  shatter  cracks  had  been  found,  and  Rail  1063  was  a  hot-bed  cooled 
rail  in  which  etch  tests  had  shown  no  shatter  cracks.  No  outstanding  differences  appear 
between  the  results  of  strength  and  ductility  tests  for  these  three  rails. 

Summed  up,  the  evidence  of  these  results  indicates  that  the  general  tendency  is  for 
strength  properties  to  increase  as  temperature  decreases  to  — 40  deg.  F.  but  the  brittleness 
of  the  steel  also  increases. 

(b)  "Damage  Line"  Tests  at  Low  Temperatures. — The  results  of  the  first  series  of 
tests  to  determine  the  properties  of  rail  steel  at  low  temperatures  suggested  the  desirability 
of  running  fatigue  tests  at  low  temperatures  using  the  "damage  Une"  method  to  study 
the  effect  of  occasional  high  stresses.  Tests  were  run  on  specimens  from  several  rails  using 
this  method  at  various  low  temperatures  ranging  from  +70  deg.  F.  to  minimum  of 
— 40  deg.  F.  A  description  of  the  "damage  line"  method  is  given  in  this  report,  pages 
732-734,  along  with  that  of  Russell's  ratio  which  was  used  to  evaluate  the  damage 
diagrams  obtained  during  the  low  temperature  testing. 


740 


Investigation   of    Fissures   in    Railroad   Rails 


TESTING    TEMPERATURE   RANGE 

+  70'  F     TO    -70»F 
(+70*  F,+30*  F,  0-  F  ,-30»  F,  -70*F.) 


40  50 

ROCKWELL  "C"  HARDNESS 

Fig.  31. — Envelope  Diagram  Showing  the  Effect  of  Tem- 
perature at  Time  of  Testing  on  the  Toughness  of  Rail  Steel 
for  Different  Hardnesses  Produced  by  Heat  Treating. 

Charpy  tests  on  unnotched  specimens. 

In  Figure  27  values  of  Russell's  "damage  resistance"  ratio  have  been  plotted  from 
test  results  for  specimens  from  various  rails.  It  vi^ill  be  noted  that  no  outstanding  varia- 
tion of  this  ratio  was  found  in  rail  steel:  (1)  Between  specimens  from  shatter-cracked 
and  from  uncracked  rails,  (2)  between  specimens  from  hot-bed  cooled  rails  and  from 
control-cooled  or  normalized  rails,  (3)  between  specimens  of  ordinary  rail  steel  and  of 
3.0  percent  chromium  steel,  and  (4)  between  specimens  tested  at  temperatures  ranging 
from  -f  70  deg.  F.  to  — 40  deg.  F.  Notched  specimens  showed  a  high  value  of  this  ratio, 
although  they  developed  an  endurance  limit  only  about  50  percent  of  that  developed  by 
unnotched  specimens. 

(c)  Tests  at  Low  Temperatures  to  Determine  the  Effect  of  Temperature  on  the 
Toughness-Hardness  Relationship  for  Rail  Steel. — In  Section  39,  pages  730,  731  of  this 
report  are  described  tests  on  unnotched  Charpy  specimens  heat  treated  to  various  hard- 
nesses and  tested  to  show  the  variation  of  toughness  (energy  strength)  of  rail  steel  with 
variation  of  Rockwell  hardness.  To  determine  the  variation  of  this  toughness-hardness 
relationship  of  rail  steel  with  change  of  temperature,  this  same  method  of  considering  the 
energy  developed  in  impact-bending  tests  of  unnotched  specimens  was  used  as  the  criterion 
of  toughness.  The  effect  of  temperature  of  testing  was  obtained  by  determining  the 
toughness-hardness  relationships  for  five  testing  temperatures,  namely  -f  70,  -|-20,  zero, 
— 30,  and  — 70  deg.  F.  Briefly  the  testing  procedure  consisted  of  bringing  the  specimens 
to  the  desired  temperature  in  a  bath  of  acetone  cooled  with  dry  ice  (solid  CO2),  quickly 
placing  them  in  the  Charpy-impact  testing  machine  and  testing  them  before  appreciable 
temperature  fluctuation  was  possible. 

Figure  31  shows  the  effect  of  temperature  on  the  toughness  of  heat-treated  rail  steel 
as  determined  by  the  toughness-hardness  relationships  obtained  for  five  testing  tempera- 
tures. The  envelope,  which  gives  the  variation  of  toughness,  was  constructed  by  super- 
imposing the  toughness-hardness  relationship  curves  for  the  five  temperatures  and  then 


Investigation    of    Fissures   in    Railroad    Rails 


741 


-30  0  +30 

TESTING    TEMPERATURE 


+70 


Fig.  Zl. — Variation  of  Toughness  of  Heat  Treated 
and  "As  Rolled"  Rail  Steel  for  a  Range  of  Temperatures 
from  +70  to  —70  deg.  F. 

Charpy   tests  of   unnotched  bars. 


enclosing  all  five  curves.  These  results  would  indicate  that  the  toughness-hardness  rela- 
tionship is  not  greatly  changed  over  the  range  of  temperature  between  -|-70  and  — 70 
deg.  F.  Also,  for  this  temperature  range  the  envelope  indicates  that  to  have  good  tough- 
ness heat-treated  rail  steel  should  not  exceed  Rockwell  "C"  47  in  hardness. 

In  the  lower  left  corner  of  Fig.  31  are  shown  the  impact-bending  (toughness)  re- 
sults obtained  for  the  five  testing  temperatures  on  specimens  of  the  as-rolled  rail. 
Figure  32  compares  these  results  with  those  obtained  for  the  heat-treated  specimens  of 
similar  hardness  (Rockwell  "C"  22).  Examination  of  the  curves  shows  that  at  all  testing 
temperatures  the  heat-treated  steel  has  much  greater  toughness  than  the  as-rolled  rail 
steel.  It  should  also  be  noted  that  as  the  temperature  at  the  time  of  testing  is  progres- 
sively lowered  the  as-rolled  material  loses  its  toughness  much  faster  than  does  the  heat- 
treated  steel.  These  results  indicate  then,  that  the  heat-treatment  of  the  rail  steel  tested 
produced  two  beneficial  results,  namely,  the  toughness  was  much  improved  over  that  of 
the  as-rolled  steel  and  the  effect  of  temperature  was  much  less  for  the  heat-treated 
material  over  the  range  of  temperatures  considered. 

45.  Effect  of  Cold  Working. — Rail  failures  due  to  spalling  out  of  metal  near  raU 
ends  are  occasionally  encountered  in  service.  The  cause  of  such  failures  has,  in  many 
cases,  been  charged  to  the  enbrittlement  of  the  metal  at  the  tread  of  the  rail  by  cold 
working  due  to  traffic.  It  is,  also,  the  opinion  of  many  that  such  failures  occur  more 
often  during  cold  weather.  If  such  failures  were  encountered  previous  to  the  compara- 
tively recent  widespread  use  of  end-hardened  rails,  will  heat-treated  hardened  steel  at  the 
rail  ends  affect  the  frequency  of  occurrence  of  spalling  (i.e.  especially  of  the  hardened 
steel)  after  these  rails  have  been  in  service  for  some  time?  It  was  to  provide  data  to 
answer  the  foregoing  question  that  the  tests  to  find  the  effect  of  cold  working  on  rail  steel 
were  made. 

The  rails  from  which  the  test  specimens  were  obtained  were  from  one  ingot  of  one 
heat  of  steel.  The  test  sections  of  the  rail  designated  to  be  end  hardened  were  hardened 


742 


Investigation    of    Fissures   in    Railroad    Rails 


NOT  COLD 

ROLLED 

NOT    END 

HARDENED 


COLD 

ROLLED 

NOT   END 

HARDENED 


NOT  COLD 

ROLLED 

END 

HARDENED 


COLO 

ROLLED 

END 

HARDENED 


PROCESS   NO    I 

112  LB   RAIL      MILL    D 

TELEWELD    REHEATED, 

WARM    WATER    QUENCH 

2000000  CYCLES  OF  40  000  L8 

WHEEL   LOAD     -     1/8"  GAP 


ji 


Ji 


CM  ■  <M      M  ■  N 


wr 


100  u 


PROCESS 

112  LB   RAIL 


NO.   2 

MILL   D 


GAS  BURNER  REHEATED, 

WATER  SPRAY  QUENCH 

2000000  CYCLES  OF  40  000  LB 

WHEEL  LOAD  -  1/8"  GAP 


o      o 

lEH: 


Ul 


JBliF 


1355- 


.81 


COOLED   TO   1500*  F    FROM  HOT 

SAWS,    WATER   SPRAY    QUENCH 

2000000   CYCLES  OF  40000  LB 

WHEEL  LOAD    -      1/8"   GAP 


PROCESS 

112  LB    RAIL 


NO.   3 

MILL  D 


PROCESS   NO   6 

112  LB.  RAIL     MILL  D 

BRUNORIZED,    COMPRESSED 

AIR    QUENCH 

2000000  CYCLES  OF  40000  LB 

WHEEL   LOAD    -     1/8"  GAP 


3««-n- 


355- 

200] 
b 

c 

100° 

c 

0 


"I  gfi  mif 


1355- 


.-'0— 200* 


100; 
c 

0 


NOTES 

PLOTTED  VALUES  BASED  ON  PER  CENT  OF  IMPACT  VALUES  OBTAINtO  FOR  UN - 
HARDENED    RAIL    NOT    ROLLED 

ALL  PLOTTED  PERCENTAGES  WERE  CALCULATED  FROM  AVERAGE  TEST  RESULTS 
OBTAINED    FROM   FOUR   OR  MORE    SPECIMENS 

Fig.  33.— Effect  of  Cold  Rolling  (in  Rolling-Load  Machine)  and 
of  End  Hardening  on  the  Toughness  of  Rail  Steel  as  Shown  by 
Charpy  Impact  Tests  of  Unnotched  Bars. 

with  care  by  four  mill  end-hardening  processes  which  are  briefly  described  in  Fig.  33. 
The  test  program  provided  for  machining  and  testing  of  unnotched  Charpy  specimens 
adjacent  to  the  tread  of  the  rail  samples  and  so  cut  as  to  include  the  desired  test  material 
for  which  the  toughness  determinations  were  to  be  made.  The  rail  samples  were  treated 
so  as  to  provide  specimens  to  give  data  on  the  toughness  of  rail  steel  according  to  the 

outlined  programs  listed  below. 

Testing  Temperatures 

Item        Source  of  Test  Specimens                                                              deg.F.  deg.F. 

1  Rail  not  cold-rolled — not  end-hardened   +70  0 

2  Rail  cold-rolled — not  end-hardened   +70  0 

3  End-hardened  rail — not  cold-rolled   +70  0 

4  End-hardened  rail — cold-rolled    +70  0 

Each  rail  specimen  was  placed  in  a  rolling-load  testing  machine  and  subjected  to 
2,000,000  cycles  of  a  40,000-lb.  wheel  load.  Specimens  were  provided  for  testing  both  at 
+  70  deg.  F.  and  0  deg.  F.  The  testing  procedure  for  the  0  deg.  F.  tests  was  as  described 
in  Section  44  (c),  page  740  of  this  report. 

Figure  33  gives  a  graphical  summary  of  the  results  of  the  tests.  Examination  of  the 
summary  reveals  that  the  toughness  of  the  end-hardened  steel  was,  as  expected,  greater 


Investigation    of    Fissures    in    Railroad    Rails 743 

than  in  the  unhardened  steel.  The  effect  of  testing  at  low  temperatures  was  a  slight  re- 
duction of  toughness  for  the  as-rolled  steel  as  compared  to  the  reduction  for  the  hard- 
ened steel,  but  the  effect  was  small  for  all  of  the  conditions  of  testing  listed  above.  The 
rolling  reduced  the  toughness  of  the  as-rolled  steel  but  did  not  cause  this  reduction  in 
the  end-hardened  material.  Processes  1  and  2  were  most  effective  in  improving  the 
toughness  of  the  end-hardened  material  as  compared  to  the  as-rolled  steel.  From  the 
above  results  it  is  indicated  that  the  end-hardened  material  has  better  toughness  prop- 
erties to  resist  rolling  or  cold  working  and  low  temperatures  than  does  the  as-rolled 
material;  this  result  was  obtained  for  all  of  the  four  mill  end-hardening  processes. 

VIII  Non-Destructive  Tests  For  Shatter  Cracks  and  Fissures 

By  J.  L.  BiSESi 

46.  Usefulness  of  Non-Destructive  Tests. — It  is  known  that  in  the  past  rails 
have  been  manufactured  from  steel  which  developed  shatter  cracks  or  was  subject  to  con- 
ditions which  would  produce  them.  It  has  been  definitely  established  that  most  rails 
which  fail  because  of  the  development  of  transverse  fissures  contain  shatter  cracks  and 
it  has  been  shown  that  the  presence  of  shatter  cracks  is  one  of  the  principal  causes 
(probably  the  principal  cause)  of  transverse  fissure  failures.  A  large  number  of  these 
rails  are  still  in  service  and,  while  it  is  true  that  a  majority  of  these  rails  will  not 
develop  fissures,  many  will  fail  before  they  are  worn  out.  It  is  evident  that  a  non- 
destructive method  of  detecting  these  potential  failures  in  new  rails  would  be  very  desir- 
able, although  the  use  of  control-cooled  rails  may  be  expected  to  lessen  its  importance. 

Detector  cars  have  been  developed  for  the  purpose  of  detecting  fissures  and  other 
defects  in  rails  after  they  have  reached  a  considerable  size  but  no  method  of  testing  has 
yet  been  devised  to  detect  the  presence  of  shatter  cracks  or  other  small  defects  in  new 
rails  or  in  rails  in  service. 

47.  Detector  Cars  for  Fissures. — Detector  cars  have  been  operated  on  the  Ameri- 
can railroads  since  1928.  The  type  of  car  which  is  most  commonly  used  is  the  Sperry 
detector  car  which  was  designed  to  travel  over  the  rails  at  a  speed  of  five  to  seven  miles 
per  hour  and  to  detect  fissures  and  other  potential  failures  by  means  of  its  electrical  and 
magnetic  equipment. 

In  connection  with  the  use  of  any  detector  car  the  following  condition  and  limitation 
may  be  noted:  The  sensitivity  of  the  detector  car,  in  its  present  state  and  in  spite  of  the 
constant  improvements  made  in  its  equipment,  has  not  been  brought  to  the  point  of 
detecting  all  of  the  small  fissures  and  other  defects  which  have  been  started  in  the  rail. 

The  only  test  available  at  the  present  time  for  the  detection  of  shatter  cracks  is  the 
etch  test  in  which  horizonal  slices  are  cut  from  the  head  of  the  rail  and  etched  in  acid. 
This  test,  if  the  shces  are  cut  thin  enough,  will  show  up  shatter  cracks  if  they  exist  in  the 
rail.  Since  this  is  a  destructive  test  and  is  time  consuming,  only  a  few  samples  can  be 
taken  from  each  heat  and  it  becomes  a  lest  of  representative  samples. 

It  would  therefore  be  advantageous  to  have  a  non-destructive  test  which  could  be 
made  on  every  rail  rolled.  It  should  be  noted  at  this  point  that  a  search  for  a  non- 
destructive test  for  shatter  cracks  is  purely  a  research  problem,  and  is  expensive  and 
slow  and  that  there  is  a  large  element  of  chance  in  such  a  search.  This  chapter  describes 
briefly  various  methods  for  detecting  shatter  cracks.  None  of  these  methods  has  proved 
reliable,  but  an  account  of  those  attempts  may  be  of  use  to  future  investigators.  In  view 
of  the  element  of  chance  and  the  cost  of  the  equipment  involved  in  making  the  various 
experiments  a  good  deal  of  the  needed  equipment  used  in  making  the  tests  has  been 
borrowed  from  other  departments  of  the  University. 


744  Investigation    of    Fissures   in    Railroad    Rails 

48.  Study  of  Mechanical  Vibration  of  Rails. — One  of  the  earUest  studies  and 
one  of  the  studies  most  persistently  followed  in  the  search  for  a  non-destructive  method 
of  detecting  shatter  cracks  in  rails  has  been  the  study  of  the  mechanical  vibrations  of 
rails.  This  study  has  consistently  been  the  most  promising  of  those  tried.  It  is  known 
that  vibrations  of  a  body  are  influenced  by  the  density  of  the  body  and  it  was  rea- 
soned that  the  density  of  a  rail  should  be  affected  by  the  presence  of  shatter  cracks. 

This  study  has  been  given  impetus  by  various  investigators  from  time  to  time, 
notably  by  the  work  of  Foppl  in  Germany  and  by  one  of  his  pupils,  von  Hydekampf, 
employed  by  the  Baldwin-Southwark  Company.  In  some  tests  made  by  the  latter,  speci- 
mens prepared  from  the  metal  in  the  heads  of  shatter-cracked  rails,  fissured  rails  and 
rails  free  from  either  were  subjected  to  a  torsional  stress  and  then  the  stress  was  released. 
From  a  study  of  the  resulting  vibrations  it  was  determined  that  the  damping  factor  oi 
the  defective  steel  was  greater  than  that  of  the  sound  steel  and  that  the  damping  factor 
had  some  relation  to  the  amount  of  structural  damage  in  the  specimen.  This  work,  as 
explained  above,  was  dependent  on  prepared  specimens,  and  since  this  investigation  it 
interested  in  non-destructive  methods  of  testing  rails,  non-destructive  damping  tests  ol 
full  section  rail  specimens  were  tried. 

In  the  earUest  experiments  on  the  vibration  of  rails  a  device  was  designed  to  strike 
the  rail  on  the  side  of  the  head,  two  ea,t  phones  and  later  other  electro-mechanical 
devices  were  fastened  to  the  other  side  of  the  rail  head  so  that  the  distance  from  the 
striking  device  to  each  of  the  pickup  devices  was  equal.  It  was  thought  that  the  presence 
of  shatter  cracks  in  the  rail,  possibly  in  the  path  between  the  striking  device  and  one  of 
the  receivers  would  so  affect  the  travel  of  the  vibrations  in  that  path  that  a  comparison 
of  the  outputs  of  the  receivers  would  indicate  the  difference. 

These  experiments  led  to  a  series  of  studies  utihzing  the  longitudinal  vibrations  ol 
the  rail  in  order  to  obtain  the  accumulative  effect  of  the  shatter  cracks  in  the  rail.  In 
these  studies  various  means  of  inducing  the  rail  to  vibrate  were  used.  These  methods 
included  mechanical  impact  devices  and  devices  so  designed  that  they  would  constitute  a 
constant  source  of  vibration  of  a  predetermined  fixed  amplitude  and  frequency.  The  fre- 
quency most  used  was  the  natural  fundamental  of  the  rail  specimen,  although  harmonics 
and  other  frequencies  were  studied.  These  devices  included  hammers  which  struck  the 
end  of  the  rails  to  give  an  impact,  magneto-striction  devices,  and  electromagnetic  devices, 
the  latter  two  giving  constant  impetus  to  the  rail. 

Studies  of  the  vibrations  included  studies  of  the  first  wave  of  sound  through  the  rail, 
the  frequency  of  the  natural  fundamental  frequency  and  other  frequencies,  the  damping 
characteristics  of  the  rails  and  the  power  necessary  to  vibrate  the  rails.  To  make  these 
studies,  methods  of  recording  the  vibrations  and  wave  shapes  on  permanent  records  were 
devised.  The  detection  devices  included  phonograph  pickups,  Piezo-electric  crystals  and 
other  electro-mechanical  transducers."  In  some  cases  the  output  of  these  devices  was 
passed  into  trick  radio  circuits  which  were  used  for  obtaining  the  values  for  study,  and 
in  other  cases  permanent  records  were  made  of  the  output  utihzing  magnetic  oscillographs. 

49.  Mechanical  Hysteresis  in  Cracked  and  in  Uncracked  Rails. — Under  some 
conditions  a  specimen  when. subjected  to  a  stress  and  then  to  removal  of  the  stress  does 
not  entirely  recover  its  shape.  This  indicates  that  energy  has  been  lost  due  to  inelastic 
action  during  the  loading-release  cycle  of  stress.  This  loss  of  energy  is  known  as  "me- 
chanical hysteresis".  It  was  thought  that  the  presence  of  shatter  cracks  in  a  rail  might 
cause  the  rail  to  show  greater  mechanical  hysteresis  under  such  a  cycle  than  would  an 
uncracked  rail. 


"  This  term  has  been  adopted  by  the  American  Radio  Relay  League  to  denote  any  apparatus  for 
transformng  mechanical  vibrations  to  electrical  impulses,  or  vice  versa. 


Investigation    of    Fissures    in    Railroad    Rails 745 

Rails  with  shatter  cracks  and  rails  which  etch  tests  had  shown  to  be  free  from  shatter 
cracks  were  mounted  in  a  testing  machine  and  flexural  load  was  applied  and  released. 
Delicate  measurements  of  deflection  were  made  both  under  increasing  load  and  under 
decreasing  load  and  load-deflection  diagrams  were  drawn.  These  diagrams  showed  dif- 
ferences between  deflection  under  increasing  load  and  under  decreasing  load  and  the  area 
between  the  diagram  for  increasing  load  and  that  for  decreasing  load  ("hysteresis  loop") 
measured  the  energy  lost  during  a  cycle  of  loading  and  unloading. 

No  systematic  difference  in  the  areas  of  the  hysteresis  loop  for  shatter-cracked  rails 
and  of  the  hysteresis  loop  for  uncracked  rails  could  be  detected. 

50.  Thermal  Tests. — ^Thermal  tests  for  the  detection  of  shatter  cracks  in  a  rail 
were  based  on  the  theory  that  when  a  heavy  current  was  passed  through  a  rail  the 
shatter  cracks  would  offer  a  resistance  to  the  passage  of  the  current  and  thereby  cause 
heat  zones  in  the  rail  at  the  location  of  the  shatter  crack.  Two  methods  of  detecting 
these  heat  zones  were  tried,  namely,  a  thermopile  and  a  heat-sensitive  paint.  These  tests 
were  not  successful,  mainly  due  to  the  fact  that  since  laboratory  etch  tests  have  shown 
that  when  shatter  cracks  are  found  in  a  rail  they  are  usually  found  throughout  the  entire 
length  and  not  necessarily  in  definite  zones  in  the  length  of  the  rail.  Moreover,  there  was 
no  sign  of  a  sharp  enough  change  of  temperature  at  a  crack  to  produce  any  marked 
difference  of  temperature  at  the  surface  of  the  rail. 

51.  Acoustic  Tests. — The  acoustic  tests  devised  for  the  non-destructive  testing  of 
rails  for  the  presence  of  shatter  cracks  fall  in  two  classes.  The  first  one  tried  was  that  in 
which  the  rail  was  struck  a  blow  and  the  presence  of  shatter  cracks  was  to  have  been 
detected  by  a  difference  in  the  "ring"  of  the  rail  as  heard  through  a  hstening  device 
which  was  attached  to  the  rail.  This  crude  method  led  to  some  of  the  tests  which  have 
been  tried  and  which  are  covered  under  vibration  tests. 

The  other  acoustic  test  was  designed  to  be  used  at  the  mill  and  was  to  have  detected 
the  noise  of  formation  of  the  crack  while  the  rail  was  cooUng.  For  the  purpose  of  making 
this  test  a  bank-vault  microphone  was  used,  the  output  of  which  was  brought  through 
an  ampHfier  to  a  recording  device.  The  rail  under  test  was  supported,  immediately  after 
rolling,  in  sMngs  so  arranged  that  the  support  could  move  with  the  rail  in  cooling.  These 
supports  were  insulated  acoustically  so  that  extraneous  noises  which  would  be  trans- 
mitted from  them  to  the  rail  and  hence  to  the  microphone  were  eliminated.  The  micro- 
phone was  fastened  to  the  end  of  the  rail.  Air  borne  noises  were  to  be  compensated  for 
on  the  record  by  having  another  rail  equipped  in  the  same  manner  as  the  rail  under  test. 
In  that  way  noise  which  occurred  simultaneously  in  the  dummy  rail  and  the  rail  under 
test  would  be  eliminated  from  consideration. 

It  was  found  in  these  tests  that  all  of  the  noises  which  were  present  only  in  the 
rail  under  test  were  due  to  the  cracking-off  of  scale  from  the  rail  while  cooling.  For  this 
reason  laboratory  tests  were  made  on  a  rail  under  controlled  conditions. 

It  had  been  found  that  shatter  cracks  could  be  produced  in  a  clear  rail  by  heating 
it  to  a  temperature  of  about  2,100  deg.  F.  in  a  hydrogen  atmosphere  and  keeping  it  at 
that  temperature  and  in  that  atmosphere  for  a  period  of  several  hours.  The  popping  of 
scale  as  the  rail  cooled  could  be  avoided  by  letting  the  rail  cool  in  an  atmosphere  of 
nitrogen.  The  microphone  test  was  tried  under  these  laboratory  conditions  without  suc- 
cess, although  etch  tests  on  the  specimen  indicated  that  shatter  cracks  had  been  formed 
by  this  treatment. 


746 Investigation    of    Fissures   in    Railroad   Rails 

52.  Drop-of -Potential  Tests. — The  drop-of-potential  (electrical)  test  used  was 
the  same  as  that  used  by  the  Sperry  Company  on  its  detector  cars  for  a  final  check  on 
the  rail  of  the  indications  on  the  record  tape.  A  heavy  current  is  sent  through  a  length 
of  rail  (about  4  ft.)  and  the  drop  of  potential  over  a  length  of  about  J4  in.  is  explored 
by  means  of  two  metal  strips  fastened  Y^  in.  apart  and  attached  to  the  terminals  of  a 
milUvoltmeter.  Above  a  fissure  the  drop  of  potential  increases,  since  the  area  of  the  cross- 
section  is  somewhat  reduced  by  the  fissure,  and  the  resistance  is  increased.  This  method 
had  been  tried  previously  at  one  of  the  steel  mills  to  detect  shatter  cracks  in  new  rails, 
but  without  success.  It  was  thought,  however,  that  if  a  rail  were  tested  by  this  method 
while  the  head  of  the  rail  was  in  tension  the  shatter  cracks  might  open  up  enough  to  give 
some  indication  on  the  milUvoltmeter.  The  rail  was  stressed  to  40,000  lb.  per  sq.  in. 
tension  at  the  shatter-crack  zone  and  the  drop-of-potential  tried  but  the  test  gave  no 
indication  on  a  rail  for  which  the  etch  test  had  shown  shatter  cracks. 

53.  X-Ray  Tests. — Early  in  the  investigation  a  rail  was  taken  out  of  service  on 
the  tracks  of  the  Illinois  Central  Railroad,  which  contained  a  horizontal  split  head  that 
had  turned  down  slightly  to  a  transverse  direction.  This  rail  was  sent  to  an  X-ray  labora- 
tory for  a  trial  of  this  method  for  the  location  of  fissures  in  rail.  This  experience  indi- 
cated that  this  method  was  very  slow  and  the  line  of  the  fissure  on  the  X-ray  film  was 
so  indistinct  that  it  would  not  have  been  found  had  the  location  not  been  marked  previ- 
ously. Since  shatter  cracks  are  so  narrow  and  since  they  cannot  be  located  previously,  the 
X-ray  method  was  not  tried  for  the  non-destructive  testing  for  shatter  cracks. 

54.  Bridge  Methods. — All  bridge  methods  are  essentially  null  methods  of  compar- 
ing two  conductors.  The  bridge  is  first  balanced  with  a  standard  conductor  in  one  arm 
and  then  the  standard  is  removed  and  the  specimen  to  be  tested  is  put  in  the  arm  of  the 
bridge.  If  the  bridge  remains  balanced  the  specimen  is  the  same  as  the  standard.  The 
bridge  may  be  operated  both  with  direct  and  alternating  current,  the  only  difference  be- 
ing that  when  direct  current  is  used  the  resistance  of  the  current  is  the  only  factor 
involved  whereas  the  inductance  must  be  considered  when  alternating  current  is  used. 

Various  bridge  methods  were  used  to  test  the  new  rails  for  the  presence  of  shatter 
cracks.  In  these  tests  a  rail  free  from  shatter  cracks  was  used  as  the  standard  and  the 
shattered  rail  for  the  specimen.  The  results  were  not  successful. 

55.  Magnetic  Tests. — The  first  magnetic  test  was  inspired  by  the  paper  of 
M.  Suzuki  of  the  Japanese  Railways  research  office  entitled,  "Magnetic  Rail  Defecto- 
scope".  His  method  consisted  in  using  a  U-shaped  magnet  to  magnetize  a  portion  of  the 
rail.  A  pick-up  coil  covering  three  sides  of  the  rail  head  was  mounted  between  the  legs 
of  the  magnet  and  it  was  thought  that  as  the  magnet  was  moved  along  the  rail  any 
defect  would  cause  a  change  in  the  flux  linkages  and  consequently  would  be  indicated  by 
the  output  of  the  pick-up  coils.  Due  to  the  difficulty  in  moving  this  large  magnet  along 
the  rail  at  sufficiently  high  speed  to  take  advantage  of  the  flux  changes  it  was  deemed 
impractical  for  laboratory  use. 

To  overcome  this  difficulty  several  forms  of  rotating  armatures  were  used  to  replace 
the  pick-up  coils.  In  some  cases  one  rotating  armature  was  placed  in  the  leakage  field 
near  the  rail  and  was  balanced  by  the  second  armature  rotating  in  a  separate  constant 
field. 

In  the  other  case  the  two  armatures  were  located  across  the  top  of  the  rail  head  in 
the  leakage  field.  Both  methods  are  differential  methods  in  that,  while  the  device  was 
made  to  travel  along  the  length  of  the  rail  and  approached  the  fissure  or  other  defect,  the 


Investigation    of    Fissures   in    Railroad    Rails 747 

first  armature  would  be  affected  by  the  change  in  the  field  due  to  the  defect  while  the 
other  armature  would  still  be  under  the  influence  of  the  unaffected  field  over  the  good 
part  of  the  rail.  In  both  of  these  cases  when  one  of  the  armatures  was  passing  over  the 
defect  an  e.m.f.  would  be  generated  to  give  the  indication  of  the  defect.  Also  the  gen- 
erated e.m.f.  would  not  be  dependent  on  the  speed  of  the  magnet  along  the  rail. 

It  was  found  that  these  magnetic  methods  were  affected  by  the  presence  of  inter- 
poles  at  various  places  along  the  rail.  It  was  also  found  that  the  generated  voltages  were 
so  small  that  they  were  obscured  by  electrical  disturbances  due  to  the  chattering  of  the 
brushes  on  the  collector  rings. 

56.  Reason  for  Non-Success  of  Non-Destructive  Tests  for  Shatter 
Cracks. — Most  of  the  methods  which  have  been  briefly  described  have  shown  promise 
of  differentiating  between  rails  which  contain  shatter  cracks  and  those  which  do  not, 
but  to  date  none  has  shown  any  positive  sign  of  being  an  absolute  criterion  of  the  differ- 
ence. In  some  cases  it  has  been  possible  to  differentiate  between  the  two  conditions  on 
some  batches  of  rails  but  when  the  group  of  rails  has  been  enlarged  or  when  it  has  in- 
cluded two  sizes  of  rails  the  test  has  failed.  Several  reasons  could  be  advanced  for  the 
non-success  of  the  tests  tried,  the  principal  one  being  that  shatter  cracks  are  exceedingly 
small  and  that  the  faces  of  the  fracture,  unlike  those  of  transverse  fissures  or  other  detail 
fractures  are  interlocking.  There  is  therefore  a  nearer  approach  to  mechanical,  electrical 
and  magnetic  continuity  than  there  would  be  for  the  other  defects.  Due  to  this  fact 
slight  variations  in  the  condition  of  the  surface  of  the  rail  under  test  or  of  its  magnetic 
properties,  or  the  relative  position  of  the  rail  and  test  apparatus  or  variation  in  the  test 
apparatus  would  overcome  much  of  the  effect  of  the  presence  of  shatter  cracks. 

Most  of  the  tests  proposed  involve  detecting  changes  in  energy  loss  caused  by  shatter 
(Cracks  by  measuring  in  some  way  the  energy  appUed  to  or  absorbed  by  the  rail.  The 
total  amount  of  energy  lost  around  minute  shatter  cracks  is  so  small  that  variations  in 
this  energy  are  masked  by  variations  of  energy  distribution  in  the  vastly  larger  mass 
of  sound  steel  in  the  rail. 

This  does  not  mean  that  the  search  for  a  non-destructive  test  for  the  presence  of 
shatter  cracks  is  hopeless  but  it  does  mean  that  it  would  be  necessary  to  make  further 
investigations  of  the  methods  already  used  to  eliminate  the  variables  which  now  influence 
them.  For  the  present,  at  least,  this  phase  of  the  investigation  has  been  discontinued. 


IX  Acceptance  Tests  For  Rails — Drop  Tests  and  Bend  Tests 

By  N.  J.  Ali-eman 

S7.  Former  Studies  of  Bend  Tests  for  Rails. — In  1900,  when  all  rails  were 
produced  by  the  acid  Bessemer  process,  making  relatively  high  phosphorus  steel,  the 
drop  test  was  introduced  by  the  Pennsylvania  Railroad  as  an  impact  test  to  eliminate 
excessively  brittle  rails. 

After  open  hearth  rails  had  been  in  use  for  several  years  it  was  thought  by  many 
engineers  that  the  drop  test  did  not  give  sufficient  information  regarding  the  reliabiUty 
of  a  rail  for  service,  and  that  some  form  of  bend  test  would  give  a  better  measure  of  the 
strength,  elastic  properties  and  ductiUty.'" 


"References  to  bend  tests  are  found  in  Volumes  12,  14  and  16  of  the  AREA  Proceedings,  on  work 
done  by  M.  H.  Wickhorst,  then  encineer  of  tests  of  the  Rail  committee.  Volumes  18  and  20  contain  the 
results  of  quick  bend  tests  reported  by  W.  C.  Gushing,  chairman  of  the  Subcommittee  on  Quick  Bend 
Tests. 


748 Investigation   of   Fissures   in   Railroad   Rails 

The  results  presented  in  a  report  by  W.  C.  Gushing  cannot  be  applied  as  a  basis  for 
comparing  drop  and  bend  tests.  Individual  results  were  not  plotted  and  no  comparative 
data  on  drop  tests  could  be  found.  Much  emphasis  was  placed  on  "elastic  limit"  although 
the  methods  for  measuring  it  were  not  very  satisfactory,  when  judged  by  present-day 
practice. 

58.  Bend  Tests  and  Drop  Tests  by  the  Pennsylvania  Railroad. — ^Through 
the  courtesy  of  Vice-President  C.  D.  Young  of  the  Pennsylvania  Railroad,  a  large  amount 
of  unpublished  data  on  file  at  Altoona  on  bend  testing  and  drop  testing  obtained  over 
20  years  ago  was  made  available  to  the  test  party.  After  a  careful  study  of  the  data  it 
became  evident  that  these  tests  would  not  afford  the  means  for  getting  a  correlation  be- 
tween results  of  bend  and  drop  tests,  since  the  drop  tests  were  made  with  the  base  in 
tension  and  the  bend  tests  with  the  head  in  tension  and  since  relatively  few  rails  had 
failed  in  the  drop  test. 

For  rails  from  Mill  A  it  was  noted  that  no  rail  failed  on  the  first  blow  in  the  drop 
test  when  the  corresponding  bend-test  specimen  required  more  than  110,000  ft.  lb.  of 
energy  for  fracture.  Very  few  broke  on  the  first  blow  in  the  drop  test  when  the  energy 
for  fracture  of  companion  rails  was  greater  than  30,000  ft.  lb.,  although  six  failures  in 
the  drop  test  were  recorded  on  rails  which  developed  between  80,000  and  100,000  ft.  lb. 
energy  for  fracture  in  the  bend  test.  Results  from  the  other  mills  showed  so  few  breaks 
on  the  first  blow  that  they  did  not  furnish  any  basis  for  correlation. 

59.  Bend  Test  Rig  and  Test  Results. — Experiments  were  started  in  1933  to  try 
the  bend  test  as  a  detector  of  shatter  cracks  in  rails.  For  this  purpose  a  bend  test  rig  was 
constructed  and  used  in  a  600,000-lb.  Riehle  testing  machine  in  the  Talbot  laboratory. 
This  test  rig  is  described  in  AREA  Proceedings,  Vol.  37  (1936),  page  999.  Test  results 
obtained  with  it  are  given  in  Vol.  36  (1935),  page  1078  and  Vol.  40  (1939),  page  664. 
These  include  results  of  tests  of  166  rails  varying  in  weight  from  90  lb.  to  131  lb.  per 
yard.  Forty-two  rails  contained  shatter  cracks,  124  being  free  of  cracks;  115  of  the  rails 
were  hot-bed  cooled,  the  remaining  51  being  controlled  cooled.  All  of  these  rails  had 
passed  the  AREA  drop  test  requirements  in  the  tests  made  at  the  mills. 

Based  on  the  results  of  head-down  bend  tests  made  with  two-point  loading  and  a 
span  of  5  ft.  4  in.,  the  following  tentative  minimum  values  of  energy  for  fracture  were 
suggested  as  a  criterion  for  the  acceptance  of  rails.  (Values  of  elongation  and  deflection 
are  given  for  information). 

Energy  for  Total  Elongation  Deflec- 

Rail  Weight,                                                   Fracture,  Elongation,  Across  Break,  tion, 

lb.  per  yd.                                                        ft.  lb.  percent  percent  in. 

130-131    100,000  35  7.S  S 

110-112    75,000  35  7.5  5 

100        50,000  35  7.5  5 

On  the  basis  of  the  above  minimum  requirements  for  energy  for  fracture,  4  rails  not 
shatter  cracked  would  fail  to  pass  the  bend  test,  28  shatter-cracked  rails  would  be 
rejected  and  14  rails  containing  only  longitudinal  shatter  cracks  would  be  accepted. 

Included  in  the  rails  tested  were  three  rails  from  two  different  heats  containing 
approximately  3  percent  chromium  and  0.30  percent  carbon.  These  rails  showed  high 
elastic  strength,  but  were  very  low  in  energy  for  fracture  and  deflection  in  the  bend  test. 
The  drop  test  specimens  passed  the  AREA  requirements.  Apparently  the  high  elastic 
strength  was  responsible  for  the  good  values  in  the  drop  test.  This  high  elastic  strength 
is  shown  by  the  permanent  deflection  (set)  after  the  first  blow,  the  value  being  0.70  in., 
whereas  the  set  after  the  first  blow  on  tests  of  fifty-eight  131 -lb.  carbon  steel  rails  ranged 


Investigation   of   Fissures   in    Railroad   Rails 749 

from  0.94  in.  to  1.16  in.  It  has  been  previously  pointed  out  that  the  permanent  set  after 
the  first  blow  is  an  inverse  indication  of  the  elastic  strength  of  a  rail. 

However,  a  fact  not  so  well  recognized  is  that  a  rail  of  high  elastic  strength,  but 
which  is  very  brittle,  may  stand  up  well  in  the  drop  test  (i.e.  require  several  blows  for 
fracture)  because  up  to  the  limit  of  the  elastic  strength  very  little  energy  is  absorbed  by 
the  specimen,  most  of  the  energy  being  absorbed  by  the  springs  under  the  anvil  of  the 
drop-testing  machine. 

The  drop  test  is  supposed  to  sort  out  "brittle"  rails,  distinguishing  them  from  tougher 
ones.  Apparently  a  distinction  must  be  made  between  a  tough  steel  and  a  high  elastic 
strength  steel. 

From  the  results  of  these  tests  it  was  concluded  that  the  bend  test  is  a  relatively 
rehable  destructive  test  for  separating  shatter-cracked  rails  from  sound  rails,  and  that 
it  would  have  many  advantages  over  the  drop  test  as  an  acceptance  test  for  rails. 

60.  Advantages  and  Disadvantages  of  the  Drop  Test  and  the  Bend  Test. — 
Some  of  the  advantages  and  disadvantages  of  drop  tests  and  bend  tests  may  be  briefly 
summarized  as  follows: 

1.  The  drop  test  is  a  "pass  or  fail"  test  giving  very  little  indication  of  the 
relative  merit  of  different  rails  which  pass  the  test. 

2.  Deflection  after  the  first  blow  in  the  drop  test  gives  some  measure  of  the 
elastic  strength.  The  relative  effect  of  subsequent  blows  is  a  matter  of  uncertainty 
due  to  the  distortion  of  the  specimen  and  to  the  fact  that  the  springs  supporting 
the  anvil  absorb  an  amount  of  energy  depending  on  the  remaining  elastic  strength 
of  the  test  rail. 

3.  The  bend  test  gives  a  measurement  of  energy  for  fracture  not  widely  dif- 
ferent from  that  which  would  be  given  by  a  single-blow  impact  test  to  fracture, 
with  equipment  to  record  the  energy  remaining  in  the  hammer  (or  tup)  after 
fracture  of  the  specimen. 

4.  The  bend  test  gives  a  measure  of  strength  not  determinable  from  drop-test 
data. 

5.  The  bend  test  fractures  a  rail  under  known  values  of  load  and  deflection 
(the  energy  for  fracture  is  measured  by  the  area  under  the  load-deflection  diagram). 
The  specimen  absorbs  nearly  all  of  the  energy  except  that  lost  in  elastic  deformation 
of  the  testing  machine. 

6.  Deflection  values  in  bend  tests  of  rail  are  on  the  order  of  six  inches,  using 
a  four-foot  span,  making  delicate  deflection  measuring  devices  unnecessary. 

7.  Load  values  are  of  the  order  of  450,000  lb.  for  131-lb.  rail,  so  that  machine 
capacity  should  be  about  600,000  lb. 

61.  Standards  for  the  Bend  Test. — In  the  spring  of  1938  the  advisory  committee 
asked  the  test  party  to  formulate  standards  for  bend  tests  for  the  acceptance  of  rails  and 
to  submit  them  to  the  advisory  committee  with  a  view  to  their  consideration  by  the 
AREA  Committee  on  Rail  and  by  the  Rail  Manufacturers'  Technical  Committee. 

In  November,  1938,  an  informal  conference  was  held  between  the  test  party  of  the 
Rails  Investigation  and  a  subcommittee  of  the  AREA.  During  this  conference  the  limita- 
tions of  the  present  standard  drop  test  and  certain  advantages  of  the  bend  test  were 
brought  out.  It  was  recognized  that  the  preparation  of  definite  specifications  for  accept- 
ance or  rejection  of  rails  by  the  use  of  the  bend  test  should  be  preceded  by  a  rather 
elaborate  series  of  bend  tests  and  companion  drop  tests,  conducted  preferably  at  one  of 
the  steel  mills  in  connection  with  regular  rail  rollings. 


750 Investigation   of   Fissures   in    Railroad   Rails 

Before  it  would  be  possible  to  make  bend  tests  at  the  mill  for  the  purpose  of  estab- 
lishing the  minimum  requirements  for  energy  for  fracture  which  would  correspond  ap- 
proximately to  the  drop-test  requirement  that  a  rail  should  withstand  one  blow  without 
fracture,  certain  additional  laboratory  bend  tests  of  rails  were  needed  in  order  to  decide 
questions  relative  to  the  proper  bend-test  procedure.  For  this  purpose  additional  bend 
tests  were  made  on  a  few  90,  100,  110  and  131-lb.  rails  with  lengths  of  span  of  S  ft.  4  in. 
(the  length  used  in  all  previous  bend  tests  by  the  Rails  Investigation),  and  also  for 
spans  of  4  ft.  8  in.  and  4  ft.  (The  4-ft.  span  is  used  in  the  drop  test  for  rails  over 
100  lb.  in  weight).  Two-point  loading  was  used,  6  in.  to  either  side  of  the  center  of  the 
span.  The  results  of  these  tests  covering  weight  of  rail  and  length  of  span  have  been 
published  in  the  AREA  Proceedings,  Vol.  40  (1939),  pages  664-671. 

The  load  for  fracture  was  found  to  vary  inversely  with  length  of  span  with  a  fair 
degree  of  consistency.  Energy  for  fracture  was  found  to  vary  with  span,  although  vary- 
ing the  span  does  not  greatly  alter  energy  values.  Deflection  values  increase  with  in- 
creasing span  length,  although  above  a  span  of  4  ft.  8  in.  values  become  erratic  espe- 
cially on  base-down  (base-tension)  results.  This  irregularity  of  action  on  the  longer 
spans  is  probably  due  to  a  tendency  of  the  head  to  buckle  as  a  column  when  it  is  in 
compression.  The  only  restraint  to  sidewise  buckhng  is  the  friction  of  the  loading  block 
on  the  specimen.  For  tests  with  the  head  in  tension  the  base  is  in  compression  and  is 
wide  enough  to  resist  buckling.  Buckling  is  more  pronounced  with  the  90  and  100-Ib. 
rail.  In  order  to  eliminate  erratic  results  it  seems  desirable  to  use  a  4-ft.  span  for  the 
110,  112  and  131-lb.  rails  and  a  3-ft.  span  for  the  90  and  100-lb.  rails. 

The  following  list  will  give  some  idea  of  the  magnitude  of  values  to  be  expected 
for  sound  rails  tested  on  a  4-ft.  span  using  two-point  loading  spaced  6  in.  to  either 
side  of  mid-length. 

Energy  for  Load  for  Deflection 

Rail  Weight,                                                                         Fracture,  Fracture,  at  Fracture, 

lb.  per  yd.                                                                                  ft.  lb.             lb.  in. 

90  116,000  250,000  6.60 

100 135,000  305,000  6.50 

110 154,000  340,000  6.60 

131   200,000  450,000  6.40 

62.  Proposed  Bend-Test  and  Drop-Test  Study.— Very  few  heats  of  steel  are 
rejected  at  the  mills  on  account  of  failure  to  pass  the  drop-test  requirements.  It  is  evi- 
dent that  bend  tests  of  specimens  from  heats  meeting  the  drop-test  requirements  will  be 
of  little  value  in  establishing  the  minimum  requirements  for  bend-test  specifications. 
Because  of  the  few  drop-test  failures  considerable  time  will  be  required  to  obtain  a 
sufficient  number  of  samples  for  bend  tests  of  rails  from  heats  failing  in  the  drop  tests. 

Arrangements  have  been  made  with  the  Bethlehem  Steel  Company  to  use  a  350-ton 
hydraulic  press  in  the  fabricating  department  at  Steelton,  Pa.,  for  making  bend  tests. 
A  bend-test  rig  using  central  loading  on  a  4-ft.  span  has  been  built  and  shipped  to 
Steelton,  and  a  400,000-lb.  calibration  bar  has  been  built  and  calibrated.  Shields  for 
protection  from  flying  pieces  are  to  be  constructed  at  the  mill.  Specimens  for  bend  tests 
are  being  set  aside  at  the  mill.  As  soon  as  a  sufficient  number  have  accumulated,  mem- 
bers of  the  test  party  will  go  to  the  mill  and  make  the  tests.  It  is  expected  that  some 
prehminary  bend  tests  on  drop-test  failed  rails  will  be  made  in  the  near  future.  Tests  will 
be  made  with  the  head  down  (head  in  tension),  using  a  single-point  loading. 


Investigation    of    Fissures   in    Railroad   Rails 7S1 

X  Future  Study  of  Fissures  in  Rails 

63.  Specifications  for  Bend  Tests  for  Rails. — Plans  have  been  made  and 
apparatus  built  for  conducting  a  rather  extensive  series  of  tests  of  bend  tests  on  rails 
at  the  Steelton  Plant  of  the  Bethlehem  Steel  Company.  It  is  proposed  that  this  work 
may  be  begun  during  1941,  and  it  is  hoped  that  it  will  furnish  the  basis  for  drawing  up 
specifications  for  bend  tests  as  an  alternate  to  or  a  substitute  test  for  the  present  drop 
test. 

64.  Specifications  for  Control  Cooling  of  Rails. — With  the  data  now  in  hand 
it  is  planned  during  this  year  to  draw  up,  submit  and  discuss  detailed  specifications  for 
the  times  and  temperatures  in  the  control-cooled  process  for  railroad  rails,  and  for 
certain  details  of  practice  during  that  process. 


Report  of  Special  Committee  on  Stresses  in 
Railroad  Track 

A.  N.  Talbot,  Chairman,  F.  S.  Hewes  Louis  Yager,  Vice-Chairman, 

C.  B.  Bronson  G.  W.  Kittredge  W.  H.  Penfield 

W.  J.  Burton  P.  M.  LaBach  G.  J.  Ray 

♦Robert  Faries  F.  R.  Layng  Albert  Reichmann 

C.  W.  Gennet,  Jr.  J.  de  N.  Macomb  H.  R.  Satford 

F.  M.  Graham  G.  M.  Magee  F.  E.  Turneaure 

H.  E.  Hale  **John  V.  Neubert  J.  E.  Willoughby 


Committee 


Died  September  8,   1940. 
Died  June  4,  1940. 


I 


To  the  American  Railway  Engineering  Association: 

The  Special  Committee  on  Stresses  in  Railroad  Track,  cooperating  with  the  Com- 
mittee of  the  American  Society  of  Civil  Engineers  and  with  the  Association  of  American 
Railroads,  presents  the  following  report  of  progress. 

During  the  past  year  the  staff  of  the  committee  has  continued  in  the  work  of 
analyzing  and  correlating  the  accumulation  of  data  and  of  preparing  material  for  pub- 
lication, as  well  as  developing  apparatus  and  carrying  on  field  and  laboratory  tests.  The 
Seventh  Progress  Report  has  been  published  and  other  material  is  under  preparation  for 
publication. 

Seventh  Progress  Report 

The  Seventh  Progress  Report  of  the  committee  is  to  be  found  in  Bulletin  No.  418, 
June-July,  1940,  pages  101  to  208.  The  report  deals  with  the  tests  of  rail  and  rail  joints 
made  with  locomotives  running  at  various  speeds  and  with  rail  and  bar  stresses  and 
depressions  measured  by  magnetic  strain  gages  and  recorded  on  oscillograph  films.  Brief 
comments  on  parts  of  the  report  seem  worth  making. 

It  was  found  that  with  the  electric  locomotive  the  averages  of  the  stresses  in  the 
base  of  rail  differed  somewhat  at  the  two  sides  of  the  locomotive  and  also  at  the 
several  gage  locations.  It  is  brought  out,  however,  that  the  averages  of  the  measured  rail 
stresses  for  all  the  driving  wheels  do  not  differ  much  at  speeds  of  5,  60  and  90  miles 
per  hour.  Average  values  for  individual  wheels  may  differ  considerably.  Speeds  ranging 
from  5  to  60  miles  per  hour  show  only  minor  changes  in  the  magnitude  of  the  stresses 
for  any  given  wheel  at  any  given  gage  location.  At  speeds  higher  than  60  miles  per  hour 
wider  variations  in  stress  are  noticeable  for  different  wheels  and  for  different  gage  loca- 
tions; sometimes  very  marked  changes  in  stress  and  moment  under  a  given  wheel  are 
developed  within  a  distance  of  ten  feet.  In  the  runs  an  increase  in  stress  in  one  rail  for 
a  given  wheel  is  generally  accompanied  by  a  decrease  in  the  other  rail  for  the  companion 
wheel.  It  is  significant  that  although  the  average  stress  in  the  two  rails  for  companion 
wheels  may  differ  little  in  the  various  runs  at  a  high  speed,  the  stresses  in  one  rail  may 
be  considerably  higher  than  in  the  other.  At  speeds  of  90  miles  per  hour,  for  one  gage 
location  the  left  rail  developed  a  bending  moment  of  205,000  in.-lb.  and  the  right  rail 
one  of  435,000  in.-lb.,  corresponding  to  stresses  of  7,500  and  15,900  lb.  per  sq.  in.,  re- 
spectively, and  indicating  a  considerable  transfer  of  load  pressure  from  one  driver  to  its 

Bulletin  423,  February,  1941. 

753 

A 


754  Stresses   in    Railroad    Track 

companion  wheel.  The  analytical  treatment  of  forces  given  in  the  report  indicates  how 
lateral  forces  applied  to  a  pair  of  drivers  may  greatly  modify  the  division  of  load  pres- 
sure between  the  two  wheels  and  the  two  rails.  As  the  gages  were  applied  only  at  the 
middle  of  the  rail  base,  no  information  is  available  on  lateral  bending  of  the  rail.  The 
data  regarding  stresses  and  moments  in  rail  served  a  very  useful  purpose  as  a  basis  of 
comparison  in  the  discussion  of  the  tests  of  rail  joints. 

The  joint  tests  gave  a  great  variety  and  extent  of  information  which  cannot  be 
condensed  into  brief  form.  They  confirmed  the  view  that,  with  excellence  of  fit,  stiff- 
ness and  sturdiness  of  bar  are  accompanied  by  ability  to  develop  a  high  joint  moment 
ratio  (that  is,  a  high  bending  moment  in  the  joint  for  a  given  wheel  load  as  compared 
with  the  full  rail),  and  this  high  joint  moment  ratio  constitutes  a  proper  measure  of  the 
effectiveness  of  a  rail  joint,  provided  the  track  has  been  tamped  to  fit  the  camber  of  the 
bars  and  the  tie  supports  are  normal.  The  best  of  the  joints  showed  a  joint  moment 
ratio  of  0.85  and  0.90,  which  are  excellent  showings  in  well  tamped  track.  Although  the 
vertical  and  longitudinal  movements  between  rail  and  bar  fishing  surfaces  are  very  small 
with  closely  fitting  bars,  opportunities  for  wear  will  be  present,  particularly  when  the 
position  of  the  bearing  contacts  between  bar  and  rail  are  such  as  to  develop  very  high 
bearing  pressures  at  the  top  fishing  surfaces  near  the  rail  ends  when  the  wheel  loads  are 
apphed.  Worn  bars  were  found  to  give  increased  vertical  movement  between  bar  and 
rail,  and  the  effectiveness  of  the  joint  to  develop  bending  moment  was  thereby  greatly 
diminished. 

It  is  understood,  of  course,  that  the  use  of  the  bending  moment  developed  in  the 
joint  as  a  measure  of  its  effectiveness  assumes  a  smooth  joint  and  normal  support — the 
additional  moment  developed  when  batter  near  the  rail  ends  stimulates  impact  on  the 
joint  with  resulting  higher  moment  in  the  bars  cannot  properly  be  used  to  measure  the 
effectiveness  of  a  joint.  It  was  judged  that  in  a  joint  having  excellence  of  fit  little  differ- 
ence in  bending  moments  would  be  found  in  the  average  bending  moment  developed  at 
the  different  speeds,  but  at  the  higher  speeds  a  wide  spread  of  the  magnitudes  would 
occur  as  was  the  case  with  the  full  rail,  due  doubtless  to  variations  in  the  action  of  the 
locomotive  at  the  higher  speeds,  and  therefore  that  at  the  high  speeds  greater  values 
than  those  reported  may  be  expected  with  more  or  less  frequency.  Attention  may  well 
be  called  to  the  inadequacy  of  the  tests  on  a  few  joints  of  24-in.  length,  which  gave 
smaller  moments  than  those  found  with  36-in.  bars.  They  should  not  be  used  for  com- 
parison with  the  longer  bars.  Further  tests  in  track  made  under  known  conditions  are 
needed  before  proper  comparison  between  long  and  short  bars  may  be  made. 

Having  equipment  available,  tests  were  undertaken  in  a  preUminary  way  to  find 
whether  the  testing  apparatus  would  be  satisfactory  for  determining  the  effect  of  a  flat 
spot  on  a  wheel  and  the  effect  of  batter  in  the  rail  surface.  While  intended  to  be  of  an 
exploratory  nature,  the  tests  give  information  of  interest  and  point  to  procedures  that 
may  well  be  followed  in  a  more  complete  investigation  with  newly  developed  high  fre- 
quency galvanometers.  Stresses  at  the  middle  of  the  base  of  the  131-lb.  rail  were  meas- 
ured under  a  4-in.  flat  spot  on  a  wheel  of  a  heavily  loaded  coal  car.  With  speeds  from 
10  to  30  miles  per  hour  the  trend  in  the  stress  in  rail  was  fairly  definite,  with  a  maxi- 
mum as  high  as  25,000  lb.  per  sq.  in.  at  about  21  miles  per  hour,  as  compared  with  a 
stress  under  the  other  car  wheels  in  normal  condition  averaging  10,000  lb.  per  sq.  in. 
The  stress  under  the  impact  load  is  thus  2^  times  that  for  the  normal  wheels.  The  rate 
of  change  of  stress  as  the  flat  spot  struck  the  rail  doubtless  was  too  rapid  to  record  the 
full  amount  of  the  stress  with  the  galvanometers  used  at  the  time. 

To  study  the  effect  of  batter  in  the  rail  surface,  batter  spots  were  ground  in  the  rail 
surface  both  at  and  away  from  the  rail  ends  to  simulate  batter  developed  in  the  rail 


Stresses   in    Railroad   Track 755 

and  the  joint  under  service.  The  batter  irregularities  were  8  and  9  in.  long  and  the  depths 
were  about  is  in.  The  stresses  were  measured  in  the  joint  bars  and  in  the  full  rail 
directly  under  the  batter  spots,  and  while  they  varied  widely  at  different  wheels  and  loca- 
tions, the  measured  stresses,  in  general,  ranged  up  to  1J4  times  the  stress  found  for  normal 
rail  conditions.  Smaller  batter  impact  effects  than  those  found  with  the  large  flat  spots 
are  to  be  expected,  as  the  batter  spots  have  greater  length  and  lesser  depth.  Grinding  the 
9-in.  batter  to  a  length  of  36  in.  without  increasing  the  depth,  to  lessen  the  slopes  of  the 
batter  spots,  gave  a  definite  decrease  in  the  impact  effect. 

For  the  purpose  of  obtaining  information  on  procedure  in  testing  for  steam  loco- 
motive counterbalance  effect  on  stresses  developed  in  rail  and  to  learn  the  characteristics 
of  the  action  of  a  locomotive  on  the  given  track,  one  day  was  spent  in  testing  with  a 
fast  freight  locomotive  (4-8-4)  that  was  considered  to  be  normally  well  counterbalanced. 
Three  runs  were  made  at  5  miles  per  hour  and  20  runs  at  75  miles  per  hour.  To  make 
clear  the  methods  of  calculation  used  and  as  an  aid  to  the  interpretation  of  the  test 
results,  a  condensed  statement  was  given  in  the  report  covering  the  principles  underlying 
the  analysis  of  the  forces  acting  on  the  rail  and  the  methods  of  applying  the  analytical 
treatment  in  calculating  rail  stresses  that  may  be  developed  by  counterbalance  forces. 
It  is  hoped  that  this  statement  of  method  of  analysis  and  calculation  of  results  will- be 
found  useful  to  young  engineers  who  may  wish  to  look  into  counterbalance  problems. 

No  brief  resume  of  conclusions  for  these  counterbalance  tests  seems  practicable  here. 
It  is  to  be  expected  that  at  the  speed  of  75  miles  per  hour  there  will  be  large  variations 
from  average  values,  for  forces  other  than  those  considered  in  the  analysis  will  influence 
the  rail  stress,  and  the  transfer  of  load  from  one  driver  to  another  evidently  occurs  to  a 
greater  or  less  extent.  At  the  high  speed  the  differences  in  stress  at  the  several  gage 
locations  were  greater  than  expected.  With  the  exception  of  one  or  two  wheels,  in  a 
general  way  the  trend  of  the  plotted  points  of  rail  stresses  agrees  fairly  well  with  the 
direction  of  the  analytical  curves,  though  the  test  values  at  some  wheels  are  definitely 
higher  than  the  calculated  values.  One  marked  exception  in  counterbalance  trend  was 
found  in  the  right  main  driver;  the  stresses  surprisingly  showed  no  very  definite  unbal- 
ance effect,  the  points  being  scattered  over  a  wide  range  of  stress  throughout  the  whole 
revolution.  The  left  main  driver  gave  a  definite  counterbalance  trend  with  maximum 
stresses  up  to  20,000  lb.  per  sq.  in.  at  the  middle  of  the  base  as  compared  with  the 
average  stress  of  10,000  lb.  per  sq.  in.  at  5  miles  per  hour.  As  in  the  tests  with  the  elec- 
tric locomotive  the  stresses  measured  under  the  individual  drivers  of  the  steam  loco- 
motive showed  an  almost  complete  absence  of  general  speed  effect  such  as  had  been 
found  in  earlier  tests  of  track  and  locomotives.  The  measured  rail  depressions  under  all 
drivers  showed  surprisingly  good  agreement  with  the  corresponding  measured  stresses 
as  plotted  for  half  of  the  drivers  in  the  last  three  figures  and  corroborated  the  stress 
relations  throughout  the  revolution  of  a  driver  even  for  extreme  and  unexplained  values. 
The  report  of  the  tests  of  this  steam  locomotive  is  worthy  of  careful  and  detailed  study 
in  making  up  any  program  of  tests  on  the  effect  of  counterbalance  on  stresses  in  track. 

Vertical  Web  Stresses  in  112-lb.  Rail 

A  series  of  tests  was  conducted  in  May,  June  and  July  1940  on  the  tracks  of  the 
Denver  &  Rio  Grande  Western  Railroad  near  Green  River,  Utah.  These  tests  were  made 
to  study  the  cause  of  the  few  longitudinal  web  cracks  in  the  112-lb.  rail  that  had 
developed  in  service  in  less  than  a  year.  The  staff  of  the  committee  had  previously  con- 
ducted a  considerable  amount  of  developmental  work  in  connection  with  the  use  of 
the  resistance  strip  gage  and  had  developed  a  direct  current  amplifier  for  use  with  the 
strip  gage  that  improved  the  usefulness  and  reliability  of  the  gage  and  made  possible  a 


I 


756 Stresses   in    Railroad   Track 

reliable  static  method  of  calibration.  Six  complete  stress  measuring  units  were  built  and 
used  in  these  tests.  The  longitudinal  web  cracks  had  been  found  in  the  outer  face  of 
the  rail  web  at  the  thinnest  part  of  the  web  section,  always  on  the  outer  face  and  mostly 
on  tangent  track.  The  strip  gages  were  placed  in  vertical  positions  on  the  rail  web,  gen- 
erally at  3  ^  in.  above  the  rail  base,  approximately  the  height  at  which  cracks  had  ap- 
peared in  the  rails  that  had  been  replaced.  Most  of  the  measurements  were  made  under 
regular  scheduled  freight  and  passenger  trains,  but  two  test  locomotives  were  used  for 
a  day  each.  The  records  of  vertical  web  stresses  on  both  of  the  web  faces  for  some 
driving  wheels  showed  compressive  stresses  ranging  from  8,000  to  12,000  lb.  per  sq.  in. 
indicating  that  the  wheel  bearing  came  fairly  centrally  on  the  head  of  the  rail.  More 
generally,  however,  high  compressive  web  stresses  were  found  in  the  inner  face  under 
most  driving  wheels,  accompanied  by  tensile  stress  of  lesser  amounts  on  the  outer  web 
face.  Occasionally  maximum  tensile  values  in  the  outer  web  face  under  the  heavy 
locomotive  driving  wheels  reached  28,000  lb.  per  sq.  in.  Many  values  of  the  compres- 
sive stress  in  the  inner  face  were  between  25,000  and  50,000  lb.  per  sq.  in.,  several 
reached  50,000  lb.  per  sq.  in.,  and  occasionally  there  were  even  higher  compressive 
stresses.  It  was  well  established  that  the  bearing  between  wheel  and  rail  at  points 
giving  the  very  high  compressive  stresses  came  considerably  inside  of  the  middle  of  the 
rail  head.  The  shiny  area  of  the  rail  head  surface  also  indicated  that  the  wheel  bearing 
was  generally  well  toward  the  gage  side  of  the  head.  The  six  gages  were  later  placed 
on  the  web  at  different  heights  to  determine  whether  eccentric  loading  on  the  rail  head 
or  lateral  forces  was  primarily  responsible  for  the  uneven  distribution.  From  the  meas- 
urements and  other  evidence  it  is  beheved  that  the  primary  factor  in  the  uneven  stress 
distribution  between  the  two  web  faces  is  without  doubt  the  eccentric  loading  of  the  rail. 

To  broaden  the  scope  of  the  work,  web  stresses  were  measured  under  a  variety  of 
conditions:  The  1  in  40  tie  plates  were  replaced  by  1  in  20  tie  plates;  at  one  location 
the  rail  head  was  ground  to  %  in.  center  bearing;  measurements  were  made  on  110-lb. 
RE  rail  that  had  been  in  track  5  years  on  which  the  wear  had  brought  the  wheel  bear- 
ing more  centrally  on  the  rail  head;  and  a  limited  number  of  measurements  were  made 
on  a  1-deg.  40-min.  curve. 

In  a  further  study  of  the  vertical  web  stress  problem  tests  were  made  under  regular 
traffic  on  new  112-lb.  rail  in  tangent  track  of  the  Illinois  Central  Railroad  in  Ilhnois  in 
October  and  November  1940.  Considerable  general  information  was  obtained  on  the  web 
stresses  developed  in  the  rail.  Measurements  were  also  made  under  the  following  condi- 
tions: 112-lb.  rail  in  track  4  years,  110-lb.  rail  in  track  15  years,  and  90-Ib.  rail  in  track 
20  years.  A  study  is  now  being  made  of  the  stresses  measured  in  the  webs  of  these  rails. 
Considerable  variation  was  found  from  place  to  place  in  the  magnitude  and  nature 
of  the  stresses,  and  in  the  relation  between  the  stresses  at  the  two  faces.  Cant  of  rail, 
wear  of  rail  head,  condition  of  rail  support,  contour  of  wheel  tread,  place  of  contact 
between  wheel  and  rail  head,  and  other  variables  evidently  are  factors  affecting  the 
web  stresses. 

The  information  so  far  obtained  brings  out  a  need  for  further  tests  on  the  web 
stress  problem.  A  program  may  well  include  tests  on  112-lb.  rail  and  131-lb.  rail  on 
both  tangent  and  curved  track. 

Service  Tests  of  Joint  Bars 

In  cooperation  with  Subcommittee  7  on  Service  Tests  of  Various  Types  of  Joint 
Bars  of  Committee  4 — Rail,  observational  tests  have  been  continued  on  the  test  stretches 
of  joint  bars  on  the  Pennsylvania  Railroad  and  the  Atchison,  Topeka  &  Santa  Fe 
Railway.  A  report  of  these  tests  is  included  in  the  report  of  the  Committee  on  Rail. 


Stresses   in    Rail.road   Track 757 

Additional  information  on  the  service  tests  of  joint  bars  was  given  in  the  chairman's 
address  at  the  1940  convention.  (Proceedings  AREA,  Vol.  41,  1940,  page  659). 

Rolling-Load  Tests 

Rolling-load  tests  of  rail  joints  have  been  continued  in  the  rolling-load  machine 
at  the  laboratory  of  the  University  of  Illinois.  A  report  on  the  tests  completed  up  to 
March  1940  was  given  in  the  chairman's  address  at  the  1940  convention.  (Proceedings 
AREA,  Vol.  41,  1940,  page  665).  Further  tests  have  corroborated  the  findings  given  on 
page  668. 

Testing  Equipment 

Developmental  work  on  electrical  measuring  and  recording  instruments  is  being 
continued  by  the  staff.  As  a  more  thorough  knowledge  of  the  operation  of  the  apparatus 
is  obtained,  it  has  been  found  possible  by  skillful  changes  or  by  simplification  to  add 
measureably  to  the  effectiveness  and  ease  of  operation  of  the  equipment.  At  the  same 
time  the  staff  is  keeping  well  informed  on  developments  in  the  art  of  making  tests. 
The  Special  Committee  on  Stresses  in  Railroad  Track, 

A.  N.  Talbot,  Chairman. 


I 


Report  on  Stresses  in  Railroad  Track* 

An  Address  by  A.  N.  Talbot 

Chairman   of   the   Committee   on   Stresses   in   Railroad   Track 

Professor   Emeritus,   University  of   Illinois 

The  report  of  the  Special  Committee  on  Stresses  in  Railroad  Track,  beginning  on 
page  753,  contains  a  short  review  of  the  Seventh  Progress  Report. t  It  also  has  a  state- 
ment of  work  done  in  measuring  vertical  stresses  in  the  web  of  rails  on  the  Denver  & 
Rio  Grande  Western  Railroad  and  Illinois  Central  Railroad,  and  refers  to  the  report  on 
Service  Tests  of  Joint  Bars  and  to  the  chairman's  report  on  the  rolling  load  tests  of 
rail  joints. 

Instead  of  giving  further  explanation  of  the  report,  it  appears  to  be  preferable  to 
use  the  available  time  of  the  committee  in  reporting  in  brief  form  on  the  tests  of  verti- 
cal stresses  in  rail  made  on  the  D.  &  R.  G.  W.  R.  R.  and  the  I.  C.  R.  R.  in  1940. 

Tests  of  Vertical  Stresses  in  Web  of  Rail 

In  January  1940  the  maintenance  department  of  the  Denver  &  Rio  Grande  Western 
discovered  cracks  in  the  web  of  112-lb.  rail  which  had  been  laid  only  eight  months.  At 
various  rails  along  a  stretch  of  five  miles  of  main  line  single  track,  a  horizontal  crack 
had  started  on  the  outer  face  of  the  web  and  extended  into  the  web  sometimes  as  far  as 
three-fourths  of  the  web  thickness.  The  crack  occurred  near  the  thinnest  part  of  the 
web,  about  3%  in.  above  the  base,  and  had  a  length  up  to,  say,  14  in.  Rails  having  such 
a  crack  were  replaced  with  new  rails.  Investigations  made  by  the  engineer  of  tests  of  the 
railroad  and  the  mill  representatives  failed  to  find  defects  or  abnormalities  in  the  rails 
where  the  cracks  appeared. 

As  the  appearance  of  such  cracks  seemed  to  be  a  new  phenomenon  and  information 
on  the  cause  was  not  known  or  not  available,  the  railroad  asked  for  assistance  and  the 
Association  of  American  Railroads  arranged  for  the  research  engineer  of  the  Engineering 
Division  and  the  staff  of  the  Committee  on  Stresses  in  Railroad  Track  to  conduct  tests 
in  the  early  summer  in  an  effort  to  find  the  sources  or  cause  of  the  trouble.  In  the  fall 
tests  were  also  made  on  the  Illinois  Central  in  Illinois.  This  report  presents  some  of  the 
principal  results  and  findings  of  the  tests  on  the  two  railroads.  To  keep  within  the  speci- 
fied limits  of  time  details  of  the  tests  will  be  omitted,  only  parts  of  the  tests  will  be 
referred  to,  and  the  consequent  incompleteness  will  probably  not  give  a  full  understanding 
of  the  tests. 

1,  Combination  of  Bending  Stress  and  Direct  Stress 

Preliminary  analyses  of  the  problem  suggested  a  bending  action  in  the  web  of  the 
rail,  developing  high  compressive  bending  stresses,  which  in  connection  with  the  direct 
vertical  stresses  might  result  in  excessive  compressive  stresses  at  one  face  and  lower  com- 
pressive stresses  or  even  high  tensile  stresses  in  the  other  face.  The  cracks  found  were 
presumably  fatigue  cracks  progressively  developed.  Before  discussing  the  test  results  it 
will  be  well  to  consider  possible  causes  of  bending  action  in  the  web.  Two  sources  came 
to  mind  as  possible  ones,  (a)  eccentricity  of  wheel  bearing  on  the  rail  head  and  (b) 
application  of  a  lateral  force  by  the  wheel  at  the  rail  head.  See  Fig.  1. 


*  This  address,  presented  on  March  12,  1941,  supplements  the  report  of  the  Committee  on  Stresses 
in   Railroad  Track  appearing  on  page   7Sj. 

t  Seventh  Progress  Report  of  the  Special  Committee  on  Stresses  in  Railroad  Track,  Bulletin  418, 
June-July,  1940,  pages  101  to  208,  and  also  pages  139  to  246  in  the  monograph  or  special  report 
section  of  this  issue  of  the  Proceedings. 

758 


Stresses    in    Railroad    Track 


750 


(a)  Eccentric  wheel  load. — For  a  concentrically  applied  wheel  load  the  resulting 
vertical  stress  would  be  uniform  over  the  thickness  of  the  web.  The  length  of  web  re- 
sisting the  vertical  pressure  in  any  event  is  not  known  definitely  nor  is  the  law  of  varia- 
tion from  uniformity  of  stress  along  its  length,  but  for  present  purposes  an  equivalent  or 
effective  length  of  resisting  section  may  be  assumed  to  apply  to  all  the  conditions.  With- 
out considering  what  the  effective  length  of  the  resisting  section  is  (including  the  varia- 
tions in  magnitude  of  stress  along  that  length),  it  is  seen  that  a  central  load  may  be 
expected  to  give  a  uniform  stress  over  the  thickness  of  the  web,  which  may  be  termed 
the  direct  stress.  (See  upper  half  of  Fig.  1).  An  eccentric  load  will  give  in  addition  a 
bending  moment  at  any  horizontal  section  with  a  magnitude  of  Pe,  where  e  is  the  eccen- 
tricity of  the  bearing  load  with   reference  to  the  vertical  axis  of  the  rail  section.  This 


ECCENTRIC  LOAD 
A     B 


Direct 
Stress 

Bending        fTrv 
Stress  ^Nl] 

Combined 
direct  and 
bending        ^  or 
stress 


£fc. 


='-'f 


E-Pe 
^c 


Direct 
Stress 

Bending 

Stress 

Combined 

direct  and 

bending 

stress 


LATERAL   FORCE 
C D 


s,—-7r 


Hk 


^ 


^s  =  + 


.-  Hz 


S  =S,-h  s. 


P-Hz 
a  *  L 
't 


Fig.  1.  Bending  Stress  and  Direct  Stress 


bending  moment  will  be  resisted  by  the  thickness  of  the  web  acting  as  a  beam  for  what- 
ever resisting  length  may  be  developed.  These  resisting  lengths  for  both  direct  stress  and 
bending  stress  may  be  assumed  in  a  manner  that  will  give  the  calculated  stress  imme- 
diately under  the  wheel  load.  It  has  been  found  that  the  length  of  the  section  resisting 
the  direct  load  is  considerably  shorter  than  the  length  of  the  section  resisting  the  bend- 
ing moment,  perhaps  10  in.  in  all  for  the  former  as  compared  with  30  in.  or  more  for 
the  latter.  For  both  resisting  sections  the  stress  is  a  maximum  at  the  wheel  point  and 
decreases  each  way  from  this  point.  The  effective  or  equivalent  length  of  resisting  sec- 
tion for  either  the  direct  stress  or  the  bending  stress  may  be  worked  out  from  the 
stresses  at  the  opposite  faces  of  the  web  recorded  on  clear  stress  records.  The  discussion 
under  the  heading,  "5.  Notes  on  the  Distribution  of  the  Direct  Stress  and  the  Bending 
Stress  Along  the  Length  of  the  Web,"  gives  more  definite  information  on  this  matter. 


I 


760  Stresses    in    Railroad    Track 

The  combined  direct  stress  and  bending  moment  stress  may  be  written 

P       Pe 
s  =  s.  +  s.  =  --:^-Y   (77) 

c 
where  Si  is  the  direct  stress,  s-^  the  bending  stress,  a  the  effective  area  of  the  horizontal 

section   resisting  the   direct  load,   and        the  section  modulus   for  the   effective  bending 

c 
length.  It  is  seen  from  the  formula  that  the  stresses  at  the  faces  of  the  web  may  be 
either  both  compressive  or  one  compressive  and  the  other  tensile. 

To  put  the  formula  in  words:  Calling  compressive  stress  minus  and  tensile  stress 
plus,  the  combined  direct  stress  and  bending  stress  given  by  the  formula  may  be  stated 
to  be  the  algebraic  sum  of  (1)  the  compressive  direct  stress  due  to  the  wheel  loading 
considered  as  distributed  uniformly  over  the  thickness  of  the  web  and  for  a  length  that 
may  be  called  the  equivalent  or  effective  bearing  section  length  and  (2)  the  compressive 
or  tensile  bending  stress  found  from  the  bending  moment  due  to  the  eccentricity  of  load- 
ing or  other  applied  forces  as  calculated  with  a  section  modulus  based  on  the  equivalent 
or  effective  length  of  the  section  which  resists  bending.  The  combined  bending  and  direct 
stress  is  scaled  from  the  stress  record  of  the  film. 

It  may  be  added  that  in  evaluating  the  stress  records  of  the  tests  the  magnitude  of 
the  direct  stress  at  a  wheel  is  taken  as  one  half  the  algebraic  sum  of  the  measured 
stresses  at  the  two  opposite  web  faces.  The  magnitude  of  the  bending  stress  at  either 
face  under  the  wheel  is  plus  or  minus  one  half  of  the  algebraic  difference  of  the  measured 
stresses  at  the  two  opposite  web  faces. 

(b)  Lateral  force  at  the  rail  head. — Considering  the  vertical  wheel  load  to  be  ap- 
plied centrally  as  in  the  lower  half  of  Fig.  1,  a  lateral  force  H  will  produce  a  bending 
moment  of  Hz  at  a  section  z  below  the  point  of  application  of  H.  The  combined  direct 
stress  and  bending  stress  may  then  be  taken  as  the  algebraic  sum  of  the  two  stresses, 
found  in  a  way  similar  to  that  given  for  the  case  of  eccentric  loading  just  discussed. 
With  a  lateral  force  acting,  the  form  of  the  formula  will  be  the  same  as  that  for  eccen- 
tric loading,  but  the  magnitude  of  the  bending  moment  will  vary  with  the  distance  z  to 
the  resisting  section  taken,  and  the  effective  length  of  the  section  resisting  the  lateral 
bending  of  the  web  probably  will  be  greater  for  the  larger  values  of  s. 

It  is  apparent  that  a  combination  of  the  two  sources  of  bending,  eccentric  loading 
and  lateral  force,  is  possible.  The  assumptions  for  both  cases  used  are  not  fully  accurate 
or  complete  but  constitute  an  approach  to  solutions.  The  analyses,  assumptions  and 
formulas  should  be  considered  as  preliminary  in  their  nature  and  roughly  approximate; 
they  are  presented  in  an  effort  to  give  a  conception  of  the  relation  between  forces  and 
stresses.  A  single  laboratory  test  made  with  central  loading  indicates  that  the  stresses  at 
a  horizontal  section  toward  the  bottom  of  the  web  are  much  smaller  accordingly  than 
those  at  a  section  near  the  top.  This  test  and  other  observations  indicate  that  for  both 
direct  stress  and  bending  resistance  further  investigations  must  be  made  to  secure  fully 
acceptable  analyses  and  formulas. 

It  may  be  noted  here  in  advance  that  the  test  results  indicate  that  eccentricity  of 
bearing  is  the  principal  source  of  the  bending  stresses. 

2.  Principal  Tests  with  112-lb.  Rail  on  the  D.  &  R.  G.  W.  R.  R. 

The  tests  on  the  D.  &  R.  G.  W.  R.  R.  were  made  on  the  main  line  single  track 
east  of  Green  River,  Utah.  The  track  appeared  excellent  and  in  very  good  condition. 
Double-shouldered  tie  plates  on  ties  machine  adzed  before  rail  laying  gave  reasonably 
uniform  rail  cant,  ranging  from  1  in  35  to  1  in  50.    The  crushed  slag  ballast  was  well 


stresses   in    Railroad   Track 


761 


tamped  and  in  general  the  ties  were  well  seated  in  the  ballast.  The  position  of  the  shiny 
area  on  the  rail  head  showed  that  the  general  wheel  bearing  was  toward  the  gage  side  of 
the  rail. 

The  locomotives  making  these  records  were  largely  3700  class  (4-6-6-4,  mallet  type), 
giving  perhaps  two-thirds  of  the  records,  with  the  other  third  divided  between  the  1700 
(4-8-4)  and  1600  (4-8-2)  classes.  Driving  wheel  weights  ranged  from  33,000  to  37,000 
lb.  Three  runs  were  obtained  with  locomotives  of  the  1800  class  (4-8-4).  In  addition  two 
locomotives  were  used  to  make  special  test  runs,  locomotive  3700  and  locomotive  1804. 

The  principal  test  measurement  (a  variety  of  other  measurements  was  made  at  dif- 
ferent times  and  places)  was  that  of  the  stress  in  a  vertical  direction  on  the  outer  face 
and  the  inner  face  of  the  web  of  the  rail.  The  mid-point  of  the  gage  lines  was  placed  at 
the  thinnest  part  of  the  web,  3^  in.  above  the  base  of  the  rail.  The  measurement  was 
made  by  carbon  strip  gages  (1-in.  or  ^-in.  gage  length)  applied  directly  to  the  two 
opposite  faces  of  the  web.  By  means  of  the  apparatus  developed  by  the  staff  of  the 
committee  the  stresses  at  these  places  were  recorded  on  films  by  an  oscillograph  near  by. 
In  Fig.  2  are  plotted  vertical  stresses  measured  in  both  inner  and  outer  faces  of  the  rail 
web  at  one  gage  location  for  the  3700  class  locomotives  westbound  in  regular  traffic.  The 
figure  is  given  as  an  example  of  the  distribution  of  stresses  at  the  several  driving  wheels 
for  a  number  of  runs. 


oo  00  0   ®0  0o-^^ 


-60 


-40    -, 


-20 


-i — tt — 04r i — i — if- 


3700  Class  Loco. 
.  Westbound 
Traffic 


■50-60mph. 

Inner 
Face  • 


Fig.  2.  Vertical  Web  Stresses  at  One  Gage  Location.  D.  & 


Outer 
Face 


W.  R.  R.  112-lb.  Rail 


The  place  or  location  on  the  track  at  which  a  gage  or  gages  were  placed  is  termed  a 
gage  location  and  is  given  by  naming  with  it  the  distance  along  the  track  from  a  refer- 
ence point  together  with  the  words  north  or  south  rail  for  the  rail  on  which  it  was 
placed.  In  the  tests  to  be  first  discussed  13  such  gage  locations  were  used  on  a  stretch  of 
tangent  track  with  a  descending  grade  to  the  west  giving  conditions  conducive  to  fast 
speeds  in  the  westbound  direction. 

To  give  some  idea  of  the  meaning  of  the  magnitudes  in  vertical  web  stresses,  certain 
statements  may  be  made  as  derived  from  a  study  of  the  test  results  and  a  consideration 
of  probable  values  from  an  analytical  basis.  It  may  be  .said  that  the  part  of  the  meas- 
ured stress  at  the  wheel  point  attributable  to  direct  stress  may  be  expected  generally  to 
range  from  8,000  to  14,000  lb.  per  sq.  in.  compression,  this  direct  stress  being  calculated 


762 Stresses   in    Railroad   Track 

by  taking  half  the  algebraic  sum  of  the  measured  stresses  on  the  two  opposite  web  faces. 
With  ordinary  bending  in  the  web,  the  larger  measured  compressive  stresses  on  the  inner 
face  at  the  wheel  point  may  run  to  25,000  or  even  to  30,000  lb.  per  sq.  in.  and  still  be 
considered  moderate  with  respect  to  common  conditions  of  track  and  rolling  stock — 
this  without  any  reference  to  whether  these  values  exceed  the  fatigue  resistance  of  the 
metal.  With  higher  bending  in  the  web,  values  of  compressive  stresses  on  the  inner  face 
as  great  or  greater  than  40,000  lb.  per  sq.  in.  may  be  considered  high  or  very  high. 
Tensile  stresses  on  the  outer  face  at  the  wheel  point  as  great  as  15,000  lb.  per  sq.  in. 
must  be  expected  at  times  under  ordinary  operating  conditions,  and  values  of  25,000  lb. 
per  sq.  in.  were  found  at  reflex  points  in  a  few  instances.  As  already  stated  the  algebraic 
difference  between  the  measured  stress  and  the  direct  stress  will  be  the  bending  stress, 
either  compressive  or  tensile. 

Brief  comments  on  the  various  test  results  will  now  be  made.  It  should  be  pointed 
out  that  in  this  report  all  stresses  referred  to  are  those  produced  by  the  driving  wheels 
of  the  locomotives.  Two  gage  locations  called  gage  location  21  ft.  south  rail  and  10  ft. 
south  rail  were  on  new  rails  at  points  where  a  crack  had  been  reported  in  the  replaced 
rails.  A  third  one  was  called  99  ft.  south  rail.  At  these  three  gage  locations  on  the  south 
rail  many  excessive  vertical  compressive  stresses  were  found  in  the  inner  face  of  the  web 
under  regular  traffic.  The  speeds  of  westbound  trains  ranged  from  50  to  70  miles  per 
hour.  Of  about  350  records  of  stresses  from  driving  wheels  at  the  inner  face  of  web  at 
these  three  gage  locations,  14  percent  were  above  35,000  lb.  per  sq.  in.,  6  percent  were 
above  45,000  lb.  per  sq.  in.,  and  1  percent  was  as  high  as  55,000  lb.  per  sq.  in.  Where 
compressive  stresses  in  the  inner  face  as  high  as  35,000  lb.  per  sq.  in.  occurred,  the  cor- 
responding stress  in  the  outer  face  was  generally  tensile,  and  usually  as  the  compressive 
stress  in  the  inner  face  rose,  the  tensile  stress  in  the  opposite  face  also  increased.  The 
tensile  stresses  in  the  outer  face  were  as  high  as  25,000  lb.  per  sq.  in.,  with  about  8  percent 
of  the  values  between  15,000  and  25,000  lb.  per  sq.  in. 

At  three  other  gage  locations,  two  on  the  south  rail  and  one  on  the  north  rail,  with 
150  stress  records  on  a  face  and  regular  traffic,  about  2  percent  were  greater  than  35,000 
lb.  per  sq.  in.  compression,  but  in  general  the  stresses  were  much  smaller  than  at  the 
three  gage  locations  discussed  above.  The  tensile  stresses  at  the  outer  face  ranged  up  to 
15,000  lb.  per  sq.  in. 

With  locomotive  3700  westbound  used  as  a  special  test  locomotive  (heavy  mallet 
type)  high  vertical  stresses  on  the  inner  face  were  found  at  gage  location  10  ft.  south 
rail  at  the  speeds  of  50  and  65  miles  per  hour.  Nearly  all  the  vertical  stresses  on  the 
inner  face  of  the  web  of  the  south  rail  at  this  gage  location  were  greater  than  25,000  lb. 
per  sq.  in.  compression,  10  percent  of  the  records  were  between  25,000  and  35,000  lb. 
per  sq.  in.,  30  percent  between  35,000  and  45,000  lb.  per  sq.  in.,  35  percent  between 
45,000  and  55,000  lb.  per  sq.  in.,  and  20  percent  above  55,000  lb.  per  sq.  in.  In  magni- 
tude and  frequency  the  values  here  given  for  this  gage  location  and  this  locomotive  are 
the  highest  found  in  the  tests.  They  are  all  on  the  inner  face.  On  the  outer  face  the 
tensile  stresses  were  frequent  but  not  of  large  magnitude. 

At  this  same  gage  location  on  the  south  rail,  for  the  5  runs  with  this  test  locomotive 
at  5  miles  per  hour  no  stress  on  either  lace  of  the  web  under  five  of  the  driving  wheels 
exceeded  20,000  lb.  per  sq.  in.  For  the  fourth  driving  wheel  all  of  the  values  on  the  inner 
face  were  between  35,000  and  40,000  lb.  per  sq.  in.  compression. 

On  the  north  rail  at  gage  location  10  ft.  north,  for  the  high  speeds,  the  higher 
stresses  were  smaller  in  magnitude  and  much  smaller  in  percentages  than  was  the  case 
on  the  south  rail;  sometimes  the  compressive  stress  was  greater  on  the  inner  face  and 


Stic  sscs    in    Railroad    Track 763 

sometimes  on  the  outer  face.  On  the  contrary  for  the  speed  of  5  miles  per  hour  the 
higher  compressive  stresses  on  this  north  rail  were  greater  in  magnitude  and  greater  in 
frequency  than  those  on  the  south  rail  at  the  same  speed. 

With  test  locomotive  3700  at  another  location  on  the  south  rail  (gage  location  48  ft. 
south  rail)  for  both  high  and  low  speeds  the  values  of  the  vertical  web  stress  were 
relatively  low,  all  below  25,000  lb.  per  sq.  in. 

For  test  locomotive  1804  (a  modern  4-8-4  passenger  locomotive)  at  speeds  of  5,  SO 
and  70  miles  per  hour  (4  runs  at  each  speed)  no  individual  wheel  on  either  south  or 
north  rail  gave  a  vertical  compressive  stress  in  either  inner  or  outer  face  of  web  as  great 
as  30,000  lb.  per  sq.  in.  Of  232  records  of  stress  on  the  two  web  faces  at  the  three  gage 
locations  17  values  were  between  25,000  and  30,000  lb.  per  sq.  in.  Only  one  of  these 
stresses  was  on  the  outer  face.  The  numbers  in  this  group  of  stresses  were  fairly  well 
divided  among  the  three  speeds.  Compressive  stresses  of  these  amounts  are  not  consid- 
ered to  be  unduly  high.  It  was  found  that  the  mean  stress  of  the  two  faces  for  each 
driving  wheel  was  in  the  neighborhood  of  10,000  to  12,000  lb.  per  sq.  in.  compression. 
The  stresses  in  the  outer  face  were  almost  always  compressive,  only  3  out  of  180  values 
being  tensile  and  these  having  relatively  small  magnitude.  The  records  on  which  the 
above  statements  are  based  included  those  at  gage  locations  10  ft.  south  rail,  10  ft.  north 
rail  and  gage  location  48  ft.  south  rail,  the  values  at  the  three  gage  locations  being  quite 
similar.  The  results  show  that  the  vertical  stress  records  for  this  locomotive  were  low  or 
moderate  and  uniform  and  reasonably  similar  for  the  three  gage  locations.  They  may  be 
contrasted  with  the  values  for  locomotive  3700  at  the  same  three  gage  locations. 

3.  Tests  with  112-lb.  Rail  on  the  Illinois  Central 

The  tests  on  the  Illinois  Central  were  made  on  double  track  main  line  at  perhaps 
32  different  spots  in  three  main  groups  several  miles  apart  at  places  south  of  Mattoon 
and  one  group  north  of  Oilman,  111.  The  112-lb.  rail  south  of  Mattoon  had  been  laid 
four  months  and  that  north  of  Oilman  had  been  in  track  for  about  four  years  under 
fairly  heavy  traffic.  The  track  was  in  fairly  good  condition.  Most  of  the  ties  were  not 
new.  The  cant  of  the  rail,  intended  to  be  1  in  40,  varied  more  or  less  from  place  to  place 
and  was  mostly  about  1  in  25.  The  records  were  taken  under  regular  trains.  The  locomo- 
tives were  almost  wholly  4-6-2  and  4-8-2,  with  driving  wheel  loads  ranging  from  30,000 
to  33,000  lb.  The  speeds  ranged  from  60  to  80  miles  per  hour  for  passenger  trains  and 
30  to  55  miles  per  hour  for  freight  trains. 

Measurements  were  made  on  the  112-lb.  rail  at  six  gage  locations  on  the  left  rail 
and  17  on  the  right  rail,  six  of  which  were  opposite  those  on  the  left  rail.  Perhaps  500 
driving  wheel  records  of  vertical  stresses  were  made  for  each  face  of  the  web  of  the 
rail.  Some  of  the  general  findings  of  these  tests  are  as  follows: 

1.  Generally  the  high  compressive  stress  was  on  the  inner  face  of  the  web — perhaps 
there  were  three  values  on  the  outer  face  of  about  30,000  lb.  per  sq.  in. 

2.  Of  these  500  records  on  the  inner  face,  only  four  values  are  above  45,000  lb.  per 
sq.  in.  compressive  stress,  three  being  for  one  run  of  passenger  locomotive  2458  and  one 
under  the  main  driver  of  passenger  locomotive  1135  pulling  the  Panama  Limited  train. 
On  the  two  other  runs  locomotive  1135  gave  only  one  stress  as  high  as  22,000  lb.  per 
sq.  in. 

Of  the  500  records  six  values  of  the  compressive  stress  at  the  inner  face  were  between 
40,000  and  45,000  lb.  per  sq.  in,  and  six  values  between  35,000  and  40,000  lb.  per  sq.  in. 

4.  It  is  seen  that  a  vertical  compressive  stress  higher  than  35,000  lb.  per  sq.  in.  at 
the  inner  face  was  rare,  occurring  in  only  about  3  percent  of  the  total  inner  face  stress 
records  made  by  driving  wheels. 


764     Stresses    in    Railroad    Track 

5.  Vertical  web  compressive  stresses  between  25,000  and  35,000  lb.  per  sq.  in.  were 
found  in  about  8  percent  of  the  records,  only  2  percent  occurring  at  the  outer  face. 
Considering  the  opportunities  for  eccentricity  of  bearing,  the  number  of  values  in  this 
group  may  be  called  very  moderate. 

6.  The  tension  values  in  the  outer  face  were  relatively  small.  Very  few  were  above 
15,000  lb.  per  sq.  in.,  and  only  one  was  as  great  as  20,000  lb.  per  sq.  in. 

4.  Additional  Tests  on  Both  Railroads 

The  foregoing  relates  to  112-lb.  rail  presumably  laid  with  a  cant  of  1  in  40.  To 
learn  something  of  the  effect  of  other  conditions  like  wear  and  cant  and  centralized  bear- 
ing, tests  were  made  on  the  D.  &  R.  G.  W.  R.  R.  (a)  with  the  112-lb.  rail  canted  1  in  20, 

(b)  with  the  rail  ground  for  a  short  length  to  give  central  bearing  on  the  rail  head,  and 

(c)  tests  were  also  made  on  UO-lb.  rail  that  had  been  in  service  and  had  become  worn. 
With  the  l-in-40  tie  plates  replaced  with  l-in-20  tie  plates  on  new  112-lb.  rail  at  one 

gage  location  where  many  of  the  vertical  web  stresses  in  inner  face  had  been  found  to 
be  very  high  and  also  at  one  gage  location  where  the  vertical  web  stresses  had  been 
found  to  be  moderately  high,  the  web  stresses  were  materially  modified.  At  the  inner 
face  the  compressive  stresses  were  greatly  decreased,  and  stresses  at  the  outer  face  were 
changed  from  tensile  to  compressive.  In  many  cases  there  was  reversal  of  stress  on  the 
two  faces  from  the  original  values.  It  was  apparent  that  the  change  in  cant  of  rail  had 
made  a  significant  change  in  position  of  wheel  bearing  on  rail  head.  The  results  give 
definite  evidence  that  eccentricity  of  bearing  of  wheel  on  the  rail  head  was  a  principal 
source  of  the  high  compressive  stresses  originally  found  at  the  inner  face. 

To  secure  fairly  central  bearing  of  wheel,  a  112-lb.  rail  was  ground  through  a  length 
of  4  or  5  ft.  so  as  to  leave  a  slight  ridge  ^  in.  wide  at  the  middle  of  the  head.  The  effect 
was  to  markedly  modify  the  stresses  on  the  web  faces.  The  test  was  made  with  locomo- 
tive 3700  which  had  before  given  very  high  compressive  stresses  at  the  inner  face.  The 
stresses  at  this  face  were  materially  decreased  and  those  at  the  outer  face  became  compres- 
sive stresses  of  small  magnitude,  only  3  out  of  180  values  being  tensile.  It  was  also  found 
that  certain  wheels  that  had  given  high  lateral  bending  stresses  in  the  base  of  the  rail 
did  not  continue  to  produce  this  effect. 

Tests  were  also  made  on  110-lb.  rail  laid  in  1935  and  worn  somewhat  so  that  it 
more  nearly  fitted  the  average  wheel  tread  contour.  At  the  inner  face  10  percent  of  the 
values  were  between  25,000  and  32,000  lb.  per  sq.  in.  compressive  stress,  and  none  was 
higher.  This  decrease  in  web  stress  as  compared  with  the  112-lb.  rail  doubtless  results 
from  more  nearly  central  bearing  of  wheel  on  rail.  On  the  outer  face  the  stresses  were 
evenly  spread  between  13,000  lb.  per  sq.  in.  tension  and  13,000  lb.  per  sq.  in.  compres- 
sion. A  few  tensile  stresses  were  recorded  for  the  inner  face.  The  appearance  of  the  head 
of  the  rail  also  indicated  smaller  eccentricity  of  wheel  bearing  than  did  the  new  112-lb. 
rail. 

On  the  I.  C.  R.  R.  tests  were  made  at  six  gage  locations  on  110-lb.  rail  laid  in  1924. 
The  rail  had  become  worn  and  canted  to  some  degree  and  thus  more  nearly  fitted  the 
usual  coning  slope  of  wheel  treads.  The  condition  of  the  track  varied  from  place  to  place. 
At  four  of  the  six  gage  locations  the  vertical  stresses  on  both  faces  of  the  web  were 
moderate,  generally  under  20,000  lb.  per  sq.  in.  compressive  stress.  Frequently  the  com- 
pressive stress  in  the  outer  face  was  greater  than  the  corresponding  stress  in  the  inner 
face.  At  two  other  gage  locations  opposite  each  other,  a  number  of  compressive  stresses 
were  found  between  25,000  and  35,000  lb.  per  sq.  in.  Of  these  higher  values  those  on  the 
right  rail  are  at  the  inner  face  and  those  on  the  left  rail  are  at  the  outer  face.    As  these 


stresses    in    Railroad   Track 


765 


higher  values  on  the  two  rails  were  found  to  be  simultaneous,  it  is  seen  that  the  wheel 
bearings  on  the  right  rail  must  have  been  inside  of  the  middle  of  the  head  and  at  the 
same  time  those  on  the  left  rail  were  outside  of  the  middle  of  the  head.  For  these  tests 
on  110-lb.  rail  the  highest  compressive  stress  was  41,000  lb.  per  sq.  in.,  and  3  percent 
ranged  between  30,000  and  40,000  lb.  per  sq.  in.  The  few  tensile  stresses  recorded  were 
small  and  they  occurred  on  either  face  of  the  web. 

Also  on  the  I.  C.  R.  R.  tests  were  made  at  three  gage  locations  on  90-lb.  rail  laid  in 
1920  and  still  carrying  the  regular  traffic.  This  rail  had  considerable  head  wear  and  but 
little  batter  at  the  rail  ends.  The  web  stresses  were  not  high.  Two  compressive  stresses 
of  29,000  and  33,000  lb.  per  sq.  in.  were  recorded — all  the  other  58  stresses  on  the  inner 
faces  were  smaller.  Small  tensile  stresses  were  found  on  either  face;  the  highest  was 
15,000  lb.  per  sq.  in.  It  may  be  noted  that  the  head  of  this  uncanted  rail  was  worn  to 
an  inward  slope  approximating  average  wheel  contours.  It  is  apparent  that  the  worn 
shape  of  the  head  has  a  strong  influence  in  preventing  the  occurrence  of  high  web 
stresses. 

To  show  variations  that  occur  in  track,  reference  may  be  made  to  the  conditions 
at  two  gage  locations  a  rail  length  apart  on  110-lb.  rail  on  the  I.  C.  R.  R.  laid  in  1924. 
The  ties  were  not  in  good  condition,  and  shims  had  been  placed  under  the  outer  end  of 
the  tie  plates  of  the  right  rail  for  two  rail  lengths,  making  the  gage  a  little  tight  and 
resulting  in  a  cant  of  1  in  25  on  the  right  rail  and  1  in  20  on  the  left  rail.  Under  these 
conditions  the  web  stresses  were  quite  moderate. 


D.d  R.G.W.R.R. 
Gage 
Side 


Tangent    Track 


-60 


5th  Driver  3700 

4th  Driver  3709  a— a 

1st  Driver  1803  O-O 

2nd  Driver  1609  +--+ 


-20 

Average 
Direct  Stress 


Fig.  3.  Range  of  Measured  Vertical  Web  Stresses 


To  find  the  relative  magnitude  of  the  vertical  web  stress  at  different  heights  on  the 
web,  strip  gages  were  placed  one  above  another  on  the  two  faces  and  simultaneous  values 
obtained.  Fig.  3  shows  stresses  measured  at  gage  Unes  with  centers  at  2,  3%  and  4%  in. 
above  the  rail  base  at  a  gage  location  on  112-lb.  rail  on  the  D.  &  R.  G.  W.  R.  R.,  made 
by  a  wheel  for  single  runs  of  four  locomotives.  The  diagram  shows  something  of  the  range 
in  the  web  stresses  found  under  regular  traffic  conditions.  The  higher  compressive  stresses 
decrease  rapidly  from  the  uppermost  gage  line  to  the  lowermost  gage  line.  In  general 
the  web  stresses  do  not  reverse  sign  from  the  upper  to  the  lower  portion  of  the  web. 
The  direct  stresses  shown  at  the   right  were  calculated   from   the  measured   stresses  at 


766 


Stresses    in    Railroad    T  rack 


opposite  faces  of  the  web.  Similar  measurements  of  stresses  made  at  other  gage  locations, 
one  on  112-lb.  rail  and  one  on  110-lb.  rail  on  the  D.  &  R.  G.  W.  R.  R.  and  still  another 
on  112-lb.  rail  on  the  I.  C.  R.  R.  (two  of  them  made  with  two  gages  and  one  with  three 
on  a  face),  gave  similar  decreases  in  magnitude  of  stress  from  the  upper  gage  to  the 
lower  one  or  similar  trends.  It  is  apparent  that  the  decrease  in  stress  from  above  to  be- 
low is  greater  accordingly  than  would  be  accounted  for  by  difference  in  thickness  of  web. 
Perhaps  the  greater  length  of  the  effective  section  resisting  web  bending  to  be  expected 
at  the  bottom  gage  as  compared  with  that  at  the  top  gage,  or  some  similar  action  in  the 
web,  will  be  found  to  explain  the  change  in  magnitude  from  top  to  bottom  of  web. 

5.  Notes  on  the  Distribution  of  the  Direct  Stress  and  the  Bending 
Stress  Along  the  Length  of  the  Web 

A  further  discussion  may  help  to  give  a  clearer  understanding  of  the  variable  rela- 
tion between  the  direct  stress  and  the  bending  stress  at  and  away  from  a  wheel  load. 

The  measured  vertical  stress  at  any  point  in  a  web  stress  record  may  be  considered 
as  made  up  of  (1)  a  compressive  direct  stress  and  (2)  a  bending  stress  due  to  the  flexure 
in  the  web.  The  division  of  the  measured  stress  between  direct  stress  and  bending  stress 
may  be  made  by  the  method  of  calculation  given  under  the  heading  "1.  Combination  of 
Bending  Stress  and  Direct  Stress."  A  study  of  many  records  indicates  that  the  magnitudes 
of  the  direct  stress  along  the  web  varies  from  a  maximum  at  the  wheel  point  to  a  small 
amount  at  points  averaging  perhaps  5  in.  in  front  of  and  behind  the  wheel  point  and 
that  the  form  taken  by  these  stress  values  along  the  web  approximates  a  straight  line. 
This  variation  of  direct  stresses  along  the  length  of  the  web  is  similiar  to  that  found  in 
the  laboratory  test  with  a  concentric  load  on  a  rail.  The  records  of  the  tests  indicate  that 
in  general  the  compressive  direct  stresses  at  the  wheel  point  had  magnitudes  of  8,000 
to  14,000  lb.  per  sq.  in. 


-50 

c- 

o 

I/) 

-40 

Q) 

-30 

o 

-20 

1 

-10 

-Cl 

Q> 

^ 

U 

.c   -10 

I  0 
^^  +10 
.%-^20 

to 

.S  +30 


Measured  Stress 


Bending  Stress 


Measured  Stress 


Inner  Face 


Direct 
Stress 


Bending 
Stress. 


Outer  Face 


20    10     0     10  20         20    10     O     10   20  20    10     0     10  20 

Distance    along   Rail    from    Wheel    Point- Inches 

(a)  (b)  (c) 

Fig.  4.  Forms  of  Measured  Vertical  Web  Stresses  in  Rails  in  Track 


Stresses    in    Railroad    Track 767^ 


Three  representative  forms  of  the  vertical  stress  records  showing  inward  bending  of 
the  web  at  a  pair  of  opposite  gage  lines  having  their  centers  3)4  in-  above  the  rail  base 
are  given  in  (a),  (b)  and  (c)  in  Fig.  4.  A  compressive  direct  stress  of  12,000  lb.  per  sq. 
in.  at  the  wheel  point  for  each  face  has  also  been  plotted,  and  the  direct  stress  has  been 
taken  to  decrease  as  a  straight  line  to  zero  at  points  S  in.  before  and  behind  the  wheel 
point. 

The  bending  stresses  developed  in  the  web  (compressive  and  tensile)  will  also  vary 
from  the  wheel  point  along  a  distance  IS  to  20  in.  in  front  of  and  behind  the  wheel 
point.  The  scaled  vertical  distance  from  a  point  on  the  stress  record  to  one  on  the  line 
representing  the  corresponding  point  for  the  direct  stress  or  to  the  horizontal  axis  of  the 
diagram  beyond  any  direct  stress  will  represent  the  magnitude  of  the  bending  stress  at 
any  given  distance  from  the  wheel  point,  the  stress  being  compressive  at  the  inner  face 
and  tensile  at  the  outer  face.  The  resulting  lines  representing  the  bending  stresses  would 
have  a  curved  form  from  a  maximum  at  the  wheel  point  to  a  joint  15  to  20  in.  each 
way. 

Taking  first  the  form  at  (a),  the  stresses  measured  at  the  inner  face  of  the  web 
(top  diagram)  are  compressive  all  along  a  distance  20  in.  in  front  of  and  20  in.  behind 
the  wheel  point,  and  the  stresses  at  the  corresponding  points  on  the  outer  face  (bottom 
diagram)  are  tensile.  The  stresses  shown  are  46,000  lb.  per  sq.  in.  compressive  at  the  inner 
face  and  22,000  lb.  per  sq.  in.  tension  at  the  outer  lace  when  the  wheel  is  over  the  gage, 
both  compressive  and  tensile  stresses  decreasing  at  points  away  from  the  wheel  point. 
Subtracting  the  plotted  direct  stress  from  the  total  measured  stress  at  any  point,  it  will 
be  seen  that  the  bending  stress  (either  compressive  or  tensile)  is  a  maximum  at  the 
wheel  point  and  decreases  each  way.  The  length  of  web  resisting  bending  may  be  three 
or  four  times  that  resisting  the  direct  or  bearing  load.  The  form  at  (a)  is  typical  for 
stress  records  having  relatively  large  bending  stresses. 

In  (b)  of  Fig.  4  a  different  relation  is  seen  to  exist  between  stresses  at  inner  and 
outer  faces  within  the  10-in.  length  having  direct  stress.  The  effect  of  the  direct  stress 
here  is  to  reflex  the  stress  record  and  form  a  notch  in  the  record  for  the  outer  face  and 
thus  to  develop  a  higher  tensile  stress  at  the  reflex  point  5  in.  away  than  is  found  at  the 
wheel  point.  Examples  were  found  when  the  stress  at  S  in.  from  the  wheel  was  25,000 
lb.  per  sq.  in.  tension  and  that  at  the  wheel  point  only  10,000  lb.  per  sq.  in.  Away  from 
the  reflex  points  forward  and  backward  the  measured  stress  is  almost  wholly  a  bending 
stress,  compressive  on  one  face  and  tensile  on  the  other  face.  The  length  of  web  resisting 
bending  is  somewhat  shorter  than  found  in  (a).  Records  similar  in  form  to  (b)  are  found 
when  the  bending  stresses  have  medium  magnitudes. 

In  (c)  of  Fig.  4,  in  front  of  and  behind  the  reflex  points  where  the  direct  stress  is 
too  small  to  be  noticeable,  the  measured  stress  again  is  almost  wholly  a  bending  stress, 
compressive  on  one  face  and  tensile  on  the  other  face.  However,  between  the  two  reflex 
points  the  stress  record  of  the  outer  web  face  crosses  from  tension  to  compression,  and 
at  the  wheel  point  the  compressive  stress  at  the  outer  face  may  have  a  magnitude  as 
great  or  greater  than  the  tensile  stress  at  the  reflex  point.  The  form  at  (c)  is  represen- 
tative of  the  large  number  of  stress  records  having  moderate  or  low  vertical  bending 
stresses  in  the  web.  As  the  eccentricity  of  wheel  bearing  approaches  zero  the  notch  of 
the  record  for  the  outer  face  may  be  expected  to  approach  the  part  of  the  diagram 
representing  direct  stress. 

The  diagrams  in  Fig.  4  arc  explanatory  of  most  of  the  forms  of  the  vertical  web 
stress  records.  As  will  be  seen,  they  apply  to  inward  bending  of  the  web,  but  by  reversal 
they  will  apply  to  outward  bending.  Naturally  there  may  be  variations  from  these  forms. 
Cant  of  rail,  wear  of  rail  head,  wheel  contour,  and  other  variations  will  change  conditions 


768      Stresses   in    Railroad   Track 

in  different  ways.  Thus,  with  outward  bending  of  the  web,  tensile  stress  may  be  found 
in  the  inner  face  and  compressive  stress  in  the  outer  face.  The  length  of  the  web  thick- 
ness resisting  the  direct  stress  and  also  the  length  and  the  distribution  along  the  web  use- 
ful in  resisting  the  bending  moment  will  vary  from  that  indicated  on  the  diagrams. 
Stresses  at  horizontal  sections  of  the  web  lower  than  3^  in.  above  the  base  may  have 
different  bending  moments  and  different  resistances  than  those  here  discussed.  The  dia- 
grams however  will  be  useful  in  interpreting  the  varieties  in  the  stress  records. 

6.  Comments  on  Some  of  the  Results 

To  summarize  the  main  results  of  the  tests: 

The  position  of  the  centroid  of  wheel  bearing  on  the  rail  head  evidently  exercises  a 
most  importance  influence  on  the  magnitude  of  the  vertical  bending  stresses  developed 
in  the  web  of  the  rail;  eccentricity  of  wheel  bearing  is  doubtless  generally  the  principal 
source  of  the  bending  action  found  in  the  tests.  These  bending  stresses  may  be  consid- 
erably greater  than  the  stresses  called  direct  stresses.  It  is  evident  that  the  amount  of 
the  cant  of  the  rail  and  also  the  shape  of  the  worn  top  surface  cause  marked  differences 
in  the  position  of  the  wheel  bearing  and  thus  will  affect  the  magnitude  of  the  vertical 
stresses  in  the  rail  web.  The  larger  rail  cants  decreased  the  web  bending  stresses  mate- 
rially. Worn  rail  heads  giving  greater  inward  slope  to  the  running  surface  likewise  de- 
creased the  bending  stresses,  and  thus  the  higher  compressive  stresses  were  decreased. 

It  is  apparent  that  even  under  good  track  conditions  and  under  ordinary  operating 
conditions  of  wheels  of  locomotives  and  cars,  variations  in  eccentricity  of  wheel  load 
bearing  are  to  be  expected.  Minor  imperfections  of  rail  alinement  and  surface,  differences 
in  cant  and  wear  of  rail,  wear  and  variations  in  tread  of  wheels  and  in  bearings  and 
other  parts  of  rolling  stock,  shifting  of  wheel  flange  to  and  from  gage  side  of  rail,  hunt- 
ing and  wandering  of  wheel  on  rail  due  to  coning  and  other  causes,  inherent  variations 
of  locomotive  forces  at  the  two  sides  for  different  locomotives  and  different  speeds — all 
must  be  expected.  The  position  of  the  bearing  contact  of  wheel  on  rail  is  dependent  upon 
wheel  contour  (worn  or  not),  actual  cant  of  rail  under  loaded  conditions,  wear  of  rail 
section,  position  of  wheel  flange  with  respect  to  gage  side  of  rail  as  the  wheel  continues 
its  hunting  along  on  the  rail  incident  to  coning  of  the  wheel,  and  other  causes.  What  is 
needed  is  the  nearest  practical  approach  to  conditions  giving  moderate  bending  stresses 
in  the  web.  Such  modern  improvements  as  machine  adzing  of  ties  with  high-grade  equip- 
ment should  be  given  credit  for  improved  conditions.  Excellence  in  design  and  mainte- 
nance of  rolling  stock  is  very  important. 

In  addition  to  eccentricity  of  wheel  bearing,  the  existence  of  large  lateral  forces  ap- 
plied to  the  top  of  the  rail  by  the  wheels  of  locomotives  and  cars  even  on  tangent  track 
may  develop  large  bending  moments  in  the  rail  web.  That  such  lateral  forces  may  even 
exert  extremely  high  bending  action  in  the  rail  web  is  of  course  apparent  in  the  down- 
ward and  inward  bending  when  rail  is  kinked  by  imperfect  locomotive  counterbalance, 
and  of  course  lesser  counterbalance  effects  will  contribute  in  lesser  degree  to  bending  in 
the  web  without  visible  effects. 

In  the  tests  on  the  D.  &  R.  G.  W.  R.  R.,  vertical  compressive  stresses  of  consider- 
able magnitude  were  found  under  the  wheels  on  the  inner  face  of  the  web  and  tensile 
stresses  of  lesser  magnitude  on  the  outer  face.  These  larger  values  were  found  on  the  left 
rail  at  the  high  westbound  speeds  with  regular  traffic.  Locomotive  3700  (4-6-6-4)  used 
for  tests  on  one  day,  gave  many  high  stresses  on  the  left  rail  at  the  higher  speeds  west- 
bound and  much  lower  stresses  on  the  right  rail,  while  at  speeds  of  5  miles  per  hour  the 
high  stresses  were  found  on  the  right  rail  and  moderate  stresses  on  the  left  rail.  Locomo- 


Stresses   in   Railroad   Track 768a 

tive  1804  (a  newer  4-8-4  passenger  locomotive)  at  both  slow  and  fast  speeds  gave  mod- 
erate or  small  stresses  on  both  rails,  uniform  and  reasonably  similar  for  the  same  three 
gage  locations. 

The  principal  source  of  the  high  web  stresses  on  the  D.  &  R.  G.  W.  R.  R.  is  evi- 
dently eccentricity  of  wheel  bearing  at  the  surface  of  the  rail.  Change  in  cant  of  rail, 
use  of  central  ridge  for  the  bearing  surface  for  the  wheel,  and  brightness  of  rail  surface 
near  the  gage  side  corroberate  this  conclusion. 

With  112-lb.  rail  on  the  I.  C.  R.  R.  the  higher  of  the  compressive  web  stresses  found 
were  moderate  in  magnitude  (except  for  4  values)  and  relatively  infrequent,  and  the 
tensile  stresses  were  usually  relatively  small.  Although  laid  with  tie  plates  with  inclina- 
tion 1  in  40,  the  greater  cant  of  the  rail  in  track,  mostly  1  in  25  at  the  gage  locations, 
contributed  to  moderation  in  web  stresses.  In  110-lb.  rail  laid  in  1924  and  worn  and 
canted  in  a  way  to  conform  toward  the  usual  wheel  coning  and  with  appearance  of  head 
indicating  small  eccentricity  of  wheel  bearing,  moderate  web  stresses  were  the  rule.  In 
90-lb.  rail  laid  in  1920  and  having  the  rail  head  worn  to  an  inward  slope  approximating 
1  in  17,  even  though  one  rail  web  was  vertical  and  the  other  canted  only  slightly  the 
web  stresses  were  all  moderate  or  small. 

Although  many  vertical  web  stresses  of  considerable  magnitude  were  recorded  in 
the  tests  of  112-lb.  rail  on  the  track  of  the  D.  &  R.  G.  W.  R.  R.,  the  actual  percentage 
of  high  compressive  stresses  developed  in  the  passage  of  all  the  driving  wheels  of  the 
locomotives  is  not  great,  and  the  percentage  of  the  higher  tensile  stresses  coupled  with 
alternations  of  compressive  stresses  of  considerable  magnitude  on  the  outer  face  of  the 
web  (where  the  cracks  had  formed)  is  even  smaller.  It  is  not  thought  that  the  high  com- 
pressive stresses  developed  in  the  inner  face  of  the  web,  alternating  on  that  face  perhaps 
to  zero  or  to  small  tension,  bear  any  known  relation  to  the  formation  of  cracks  in  the 
outer  face.  The  number  of  repetitions  of  alternating  tensile  and  compressive  stresses 
found  in  the  outer  face  greater  than  15,000  lb.  per  sq.  in.  is  small,  seemingly  insufficient 
to  cause  the  development  of  fatigue  cracks.  As  to  the  magnitude  of  the  higher  values  of 
stress,  at  the  inner  face  of  the  web  a  few  compressive  stresses  of  60,000  lb.  per  sq.  in. 
and  a  few  tensile  stresses  of  30,000  lb.  per  sq.  in.  were  found,  though  these  were  not 
necessarily  alternating  or  made  on  the  same  run,  and  no  cracks  had  been  found  on  the 
inner  face.  At  the  outer  face  a  few  tensile  stresses  between  25,000  and  30,000  lb.  per 
sq.  in.  (including  high  tensile  stresses  5  in.  ahead  or  behind  a  wheel  at  reflex  points) 
were  found  and  also  a  few  compressive  stresses  of  similar  magnitude,  though  their  occur- 
ence was  not  in  a  way  to  form  cycles  of  stress.  Reversals  of  this  magnitude  are  so  infre- 
quent that  they  can  hardly  by  themselves  explain  the  formation  of  cracks.  It  is  evident, 
however,  that  higher  stresses  are  frequently  developed  in  the  web  of  the  rail  in  service 
than  had  been  supposed  and  in  many  cases  these  vertical  web  stresses  are  relatively 
higher  than  the  longitudinal  bending  stresses  existing  elsewhere  in  the  rail.  Faster  speeds 
or  indifferent  conditions  of  equipment  would  have  increased  the  web  stresses.  Whether 
other  sources  of  strains  in  the  rail  were  present  and  superimposed  on  the  measured 
stresses  is  not  known.  This  matter  is  worthy  of  further  investigation. 
Two  suggestions  are  made  in  conclusion: 

(1)  That  further  tests  and  investigation  be  made  on  the  occurrence  and  the  sources 
of  high  vertical  stresses  in  the  web  of  rail  on  both  tangent  and  curved  track  for  both 
112-  and  131-lb.  rail. 

(2)  That  a  comprehensive  investigation  be  made  of  the  fatigue  resistances  of  the 
metal  in  the  web  of  the  rail,  together  with  other  conditions  that  may  contribute  to  the 
formation  of  cracks. 


PROCEEDINGS 


PROCEEDINGS 

Report  of  the  opening  session  of  the  convention  on  Tuesday 

morning,  March  11,  1941;  the  closing  session  on  Thursday 

afternoon,  March  13;  and  other  business  not  related  to 

the  presentation  of  the  committee  reports 

Address  of  F.  L.  C.  Bond  as  acting  president 

Memorial  tribute  to  George  S.  Fanning 

Address  of  C.  H.  Buford,  vice-president,  AAR 

Report  of  the  tellers 

Address  of  Hon.  Clarence  F.  Lea 

Reports  of  secretary  and  treasurer 


Opening  Session,  Tuesday  Morning,  March  11,  1941 

The  forty-second  annt-tl  convention  of  the  American  Railway  Engineering  Asso- 
ciation was  called  to  order  at  9:55  a.m.,  on  March  11,  1941,  in  the  Grand  Ball  Room 
of  the  Palmer  House,  Chicago,  by  Vice-President  F.  L.  C.  Bond,  vice  president  and 
general  manager.  Central  Region,  Canadian  National  Railways,  Toronto,  Ont. 

Vice-President  Bond:  This  is  the  forty-second  annual  convention  of  the  American 
Railway  Engineering  Association.  It  is  now  declared  open  for  business.  This  convention 
is  likewise  the  annual  meeting  of  the  Construction  and  Maintenance  Section,  Division  IV 
— Engineering,  Association  of  American  Railroads,  the  sessions  being  concurrent. 

The  first  order  of  business  is  the  reading  of  the  minutes  of  the  last  annual  meeting. 
Inasmuch  as  these  minutes  have  been  printed  and  a  copy  has  been  furnished  to  each 
member,  unless  there  is  some  objection,  the  reading  of  the  minutes  will  be  dispensed 
with.  Any  objections?  As  there  are  no  objections,  the  minutes  stand  approved  as 
printed. 

Address  of  Vice-President  Bond 

In  calling  the  convention  to  order  this  morning  it  is  with  a  heavy  heart  and  a  deep 
sense  of  the  responsibility  which  devolves  upon  me  owing  to  the  calamity  which  has 
befallen  our  Association  through  the  loss  of  our  revered  president,  George  S.  Fanning, 
to  whose  memory  appropriate  reference  will  be  made  before  beginning  the  routine  func- 
tions of  the  convention. 

In  substituting  for  our  late  president  I  will  endeavour,  as  far  as  in  me  lies,  to  give 
the  convention  an  account  of  his  able  stewardship  during  his  term  of  office — his  aims  and 
accomplishments  on  behalf  of  the  Association. 

Efforts  to  Improve  the  Association 

In  accepting  the  highest  office  which  the  Association  could  bestow,  Mr.  Fanning 
considered  it  a  position  of  trust  and  responsibility,  which  called  for  the  application  of 
all  the  resources  at  his  command,  and  which  he  gave  unsparingly,  particularly  to  the 
solution  of  the  more  difficult  problems  which  came  to  the  fore  during  his  term  as  presi- 
dent, and  measures  designed  to  improve  the  effectiveness  of  the  Association. 

769 


770  Business   Session 


This  is  well  illustrated  by  the  means  he  adopted  in  an  effort  to  carry  out  one  of 
his  chief  aims  as  your  executive  officer — an  improvement  in  the  proceedings  of  our 
convention,  and  the  manner  of  presenting  the  committee  reports.  Firm  in  the  conviction 
that  much  could  be  done  if  his  ideas  were  placed  before  the  committees  in  a  convincing 
manner,  he  set  for  himself  the  task  of  attending  at  least  one  meeting  of  each  committee. 
While  he  was  unable  to  carry  out  this  plan  in  its  entirety,  nevertheless  Mr.  Fanning 
succeeded  in  presenting  his  message  in  person  at  the  meetings  of  14  committees — no 
doubt  a  far  greater  number  than  has  ever  been  visited  in  a  year's  time  by  any  other 
president  of  our  Association. 

However,  he  was  by  no  means  content  even  with  this  record,  and,  to  insure  that  his 
views  would  be  presented  before  the  remaining  committees,  he  wrote  to  the  chairmen, 
setting  forth  what  he  had  proposed  to  say,  and  asked  that  his  letter  be  read  at  com- 
mittee meetings.  I  take  the  hberty  of  quoting  extracts  from  one  of  these  letters: 

Many  observers  feel  that  our  proceedings  are  too  dull,  with  too  much 
evidence  of  the  "steam  roller,"  and  with  too  little  discussion.  The  reasons  for 
this  are  perhaps,  first,  that  our  time  is  limited,  and,  second, — and  probably 
much  more  important — that  our  committee  reports  are  so  thoroughly  worked 
over,  and  there  is  nothing  generally  which  the  member  on  the  floor  can  find 
to  criticize  if  he  had  read  them. 

However,  there  is  something  else  which  I  think  the  committees  can  do, 
and  that  is,  make  the  presentation  of  their  reports  to  the  convention  more 
interesting.  The  present  practice  is  either  to  read  all  or  part  of  the  printed 
report,  or  simply  to  refer  to  it  by  bulletin  and  page  number.  What  I  think  we 
should  have,  to  introduce  each  subcommittee  report,  is  a  snappy  statement  of 
the  high  lights  of  the  report,  presented  in  as  striking  a  way  as  the  subcommittee 
chairman   can   command 

Our  reports,  as  printed  in  the  bulletins,  should  be  thorough,  and,  in  being 
thorough,  they  occasionally  may  have  to  be  dull,  but  in  the  presentation  of  the 
reports  on  the  floor  of  the  convention,  let's  forget  the  thoroughness  and  get 
away  from  the  dullness. 

I  am  sure  our  committees  have  taken  our  late  president's  suggestions  to  heart  and 
that  our  convention  this  year,  and  those  which  follow,  will  be  made  more  interesting 
and  more  valuable  in  consequence. 

In  centering  his  attention  on  the  presentation  of  the  reports,  Mr.  Fanning  did  not 
overlook  the  fact  that  presentation  is  the  instrumentahty  for  stimulating  discussion  from 
the  floor  of  the  convention.  Again  we  find  evidence  of  his  initiative  in  a  circular  letter 
which  he  wrote  in  his  capacity  as  chairman  of  the  Engineering  Division,  Association  of 
American  Railroads,  to  the  chief  engineers  of  the  member  roads,  suggesting  a  critical 
examination  of  the  committee  reports  by  members  of  their  staffs,  and  discussions  of 
the  same  from  the  standpoint  of  the  experiences  and  practices  of  the  individual  rail- 
roads. I  sincerely  hope  that  discussions  originating  from  this  source  will  be  given  freely 
during  the  sessions  which  follow. 

Increased  Usefulness  of  Association 

The  administration  of  your  president  has  been  marked  by  an  expansion  of  the 
Association's  usefulness  and  prestige.  In  his  capacity  as  chairman  of  the  Construction 
and  Maintenance  Section  of  the  Engineering  Division  he  took  an  important  part  in 
broadening  the  scope  of  the  research  activities  carried  on  for  the  solution  of  problems 


Address    of    Vice-President.    Bond 771 

assigned  to  our  standing  committees,  as  evidenced  by  an  increase  of  $25,900  in  the 
allotment  of  funds  for  such  work  by  the  Association  of  American  Railroads  during  1941, 
as  compared  with  the  appropriation  for  1940.  The  success  of  his  efforts  to  this  end 
may  well  be  ascribed  to  a  practical  view  of  matters  bearing  on  research,  which  inspired 
confidence  in  the  soundness  of  his  judgment  and  advice. 

Among-  the  projects  recently  authorized  is  the  investigation  of  the  relation  of  track 
to  equipment — particularly  the  effect  of  locomotive  counterbalancing,  in  which  your 
Association  in  its  capacity  as  a  unit  of  the  Engineering  Division,  is  participating  jointly 
with  the  Mechanical  Division.  President  Fanning  had  an  active  part  in  the  conferences 
leading  to  the  development  of  the  general  plan  of  this  work,  and  to  the  formation  of 
a  joint  committee  to  administer  this  important  project. 

The  resignation  of  Dr.  A.  N.  Talbot  as  chairman  of  the  Special  Committee  on 
Stresses  in  Railroad  Track,  effective  with  the  close  of  this  convention,  has  created  a 
primary  problem  to  which  your  president  and  members  of  the  Board  of  Direction  have 
given  a  great  deal  of  thought.  After  nearly  three  decades,  during  which  our  knowledge 
of  track  and  its  behaviour  as  an  engineering  structure  has  been  tremendously  expanded 
under  the  leadership  of  Dr.  Talbot,  your  board  is  now  confronted  with  circumstances 
that  differ  widely  from  those  that  were  presented  when  he  started  his  classic  experiments 
in  1913.  Instead  of  one  research  project,  your  Association  is  now  carrying  on  a  variety 
of  important  investigations  with  funds  provided  by  the  Association  of  American  Rail- 
roads. Furthermore,  it  has  at  its  disposal  the  services  of  a  research  engineer  who  was 
engaged  four  years  ago  for  the  special  purpose  of  taking  an  important  part  in  the 
research  work  of  the  Engineering  Division. 

Value  of  Coordinated  Research 

In  view  of  all  the  circumstances,  your  board  is  convinced  that  the  advantages  of 
coordinated  administration  of  this  research  work  would  be  more  readily  attained  by 
having  the  research  engineer's  office  serve  as  a  clearing  house  for  all,  or  nearly  all,  of 
the  research  work  carried  on  for  your  Association.  Accordingly,  for  the  purpose  of 
insuring  an  effective  contact  between  your  Board  of  Direction  and  the  research  engineer, 
your  board  has  adopted  a  change  in  the  committee  organization,  effective  with  the  close 
of  this  convention,  which  I  will  describe  briefly: 

The  Special  Committee  on  Stresses  in  Railroad  Track  has  been  replaced  by  a  new 
committee,  which,  in  recognition  of  its  broader  responsibilities,  will  be  known  as  the 
Committee  on  Research  Administration.  This  committee   will; 

Exercise  general  supervision  over  such  research  work  of  the  Engineering 
Division  as  administered  by  the  research  engineer,  insofar  as  it  relates  to 
assignments  of  AREA  committees  or  work  that  falls  within  the  scope  of  the 
Association's  activities. 

Review  the  requests  of  the  standing  committees  for  research  appropria- 
tions; service  and  submit  them  to  the  Board  of  Direction  with  appropriate 
recommendations. 

Initiate  arrangements  with  universities  and  others  when  the  need  for 
cooperative  investigations  is  indicated. 

It  should  be  understood  that  the  acts  of  this  committee  will  be  subject  to  such 
review  as  must  be  exercised  by  the  Committee  on  Research  of  the  Engineering  Division 
by  reason  of  its  responsibilities  for  the  research  work  of  the  division. 


772  Business    Session 


Among  the  more  formidable  activities  of  thie  Association  during  the  past  year  has 
been  the  continuation  of  the  work  of  revising  the  trackwork  plans  on  which  the  initial 
steps  were  taken  in  1930.  This  is  an  exacting  task,  which  has  involved  the  generous 
cooperation  of  the  manufacturers  of  frogs,  switches  and  crossings,  and  which,  when 
completed  during  the  present  year,  will  result  in  a  marked  improvement  as  well  as  a 
simplification  of  practices  in  this  phase  of  railway  engineering.  The  Committee  on 
Track,  which  is  charged  with  the  responsibihty  for  this  work,  will  present  tomorrow 
morning,  as  a  part  of  its  report,  SO  of  the  new  plans  for  your  consideration  and  adoption. 

While  on  the  subject  of  committees,  I  wish  to  direct  your  attention  to  the  report 
to  be  offered  this  afternoon  by  the  Committee  on  Cooperative  Relations  with  Universities, 
the  first  report  to  be  presented  by  this  committee  since  its  restoration  to  activity  by 
action  of  the  Board  of  Direction  a  year  ago. 

You  are  also  reminded  that  the  Committee  on  Rules  and  Organization,  which, 
for  certain  reasons,  submitted  no  report  in  1939  and  1940,  will  come  before  the  convention 
on  Thursday  afternoon  with  an  extended  compilation  of  rules,  which  will  be  duly 
submitted. 

In  accordance  with  a  suggestion  made  by  President  Fanning  shortly  after  the  last 
convention,  the  current  progress  report  on  the  investigation  of  fissures  in  railroad  rails 
has  been  preprinted  in  Bulletin  423,  rather  than  withhold  publication  until  after  the 
convention.  I  am  sure  that  perusal  of  the  report  will  greatly  enhance  the  value  of 
Professor  Moore's  presentation  tomorrow  afternoon. 

Association's  Finances 

The  finances  of  your  Association  are  in  sound  condition.  The  revenues  for  the 
calendar  year  of  1940  were  substantially  the  same  as  those  in  1939,  but  the  expenditures 
were  greater  in  the  amount  of  $2,181.64,  due  primarily  to  an  extraordinary  outlay  of 
$1,785.93  for  the  publication  of  the  trackwork  plans,  and  an  increase  of  $651.31  in  the 
expense  for  publications  other  than  these  plans.  However,  in  spite  of  this,  the  revenues 
exceed  the  disbursements  by  $1,814.62. 

An  analysis  of  the  expenditures  of  the  Association  over  a  period  of  several  years 
discloses  a  marked  uniformity  in  the  outlay  for  the  various  accounts  from  year  to  year, 
except  in  that  for  publications.  It  follows  without  demonstration  that  as  the  work  of 
our  committees  increases  or  decreases,  as  measured  by  the  number  of  printed  pages 
of  reports,  our  disbursements  for  printing  are  subject  to  comparable  variation. 

In  general,  therefore,  it  may  be  said  that  the  value  of  the  work  of  our  committees 
bears  some  relation  to  the  size  of  our  printing  bill,  inasmuch  as  we  know  that  our 
committee  members  and  chairmen  have  made  it  their  practice  to  weigh  carefully  the 
intrinsic  value  of  the  matter  which  they  submit  for  publication.  This  is  a  point  that 
we  should  keep  constantly  before  us.  ^ 

Junior  Memberships 

Further  details  of  the  affairs  of  our  Association  are  contained  in  the  reports  of 
the  secretary  and  the  treasurer,  which  there  is  no  reason  for  me  to  anticipate  at  this 
time  other  than  to  make  special  reference  to  the  change  in  our  constitution,  which 
became  effective  last  June,  for  the  purpose  of  estabhshing  a  junior  grade  of  membership, 
the  object  and  nature  of  which  should  be  sufficiently  apparent. 

We  look  forward  to  a  continuing  response  from  those  younger  members  of  our 
profession  who  are  resolved  to  equip  themselves  for  their  chosen  vocation  and  who 
can  appreciate  the  incalculable  benefits  and  opportunities  thus  placed  at  their  disposal. 


Tribute    to    George    S.    Fanning 773 

The  response  so  far  has  been  encouraging,  but  it  is  only  a  beginning.  I  will  take  this 
occasion  to  welcome  most  heartily  all  those  junior  members  who  are  attending  the 
convention;  you  will  find  a  helpful  brotherly  spirit  everywhere  in  evidence;  you  arc 
to  feel  quite  at  home,  and  we  would  like  you  to  show  your  active  interest  by  taking 
your  part  in  the  discussions. 

In  conclusion,  may  I  remind  you  that,  on  March  16,  1940,  you  ■  entrusted  the 
affairs  of  the  Association  to  the  late  George  S.  Fanning.  You  knew  that  his  adminis- 
tration as  president  would  present  problems  of  more  than  ordinary  consequence;  but 
his  record,  and  unfortunately  I  must  add,  his  posthumous  record,  speaks  for  itself.  It 
proves  beyond  question  that  you  chose  wisely.  His  achievements  are  both  an  inspiration 
and  a  challenge  to  those  who  follow. 


Vice-President  Bond:  The  next  order  of  business  is  the  report  of  the  secretary 
and  the  treasurer.  I  will  ask  Mr.  Lacher,  the  secretary,  to  present  these  reports. 

(The  secretary  commented  briefly  on  these  reports,  which  appear  in  full  on 
pages   791    to   801,  inclusive.) 

Vice-President  Bond:  You  have  heard  the  reports  of  the  secretary  and  the  treasurer. 
What  is  your  pleasure? 

Past-President  Hastings:   I  move  their  adoption. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Vice-President  Bond:  I  will  now  ask  Mr.  Hastings  if  he  will  kindly  enable  us 
to  pay  a  tribute  to  the  memory  of  our  president  who  is  not  with  us  today. 

Tribute  to  George  S.  Fanning 

During  the  closing  hours  of  the  1940  convention  many  of  those  who  arc  here  this 
morning  witnessed  the  installation  of  the  new  president  of  the  Association.  I  had  the 
privilege  and  honor  at  that  hour  of  handing  to  George  Stokes  Fanning  the  symbol  of 
office,  the  gavel  he  was  to  use  throughout  the  year.  Surely  none  of  us  thought  then 
that  when  we  came  to  another  convention,  after  a  year  had  rapidly  rolled  away,  we 
would  not  find  George  Fanning  in  the  chair.  Here  we  are  this  morning  and  Mr.  Fanning 
is  not  here.  On  January  2  this  year  he  put  down  the  cares  and  burdens  of  fife,  gave 
up  its  joys  and  sorrows  and  went  on  out  into  that  which  lies  beyond  and  endures 
through  all  eternity.  We  take  this  moment  to  honor  his  memory.  How  insufficient 
words  seem  to  be  at  such  a  time;  we  feel  within  us  the  urge  of  things  that  cannot  be 
expressed,  and  yet  we  try  to  express  them  in  order  that  the  world  may  know  we  are 
not  devoid  of  feeling  and  may  know  that  this  great  engineering  association  is  concerned 
in  the  human  things,  the  principles  of  love  and  friendship,  the  things  of  life  that  arc 
the  first  things  and  the  things  that  endure.  The  poet  Longfellow  said  in  a  familiar 
verse: 

Life  is  real,  life  is  earnest. 

And  the  grave  is  not  its  goal, 

Dust  thou  art  to  dust  returnest. 
Was  not  spoken  of  the  soul. 

Mr.  Fanning  lived  a  life  that  was  real  and  a  life  that  was  earnest.  He  put  himself 
unselfishly  into  all  the  walks  of  life  wherein  he  trod,  and  the  engineering  profession, 
the    railroad   industry,    civil   and   social    life   are   all    better    because   he    was   here   and 


7 74  Busines s   Session 


contributed  to  the  ongoing  of  all.  I  had  the  privilege  of  having  a  close  warm  friendship 
with  Mr.  Fanning,  as  well  as  the  professional  and  association  contacts;  his  kindly 
counsel  and  earnestness  of  purpose  I  cherish  in  memory. 

I  do  not  here  recount  to  you  his  work  with  this  Association,  you  know  of  it,  the 
records  of  the  Association  record  it  for  posterity.  We  miss  him  now,  we  will  miss 
him  in  the  years  to  come,  but  to  look  at  the  record  of  such  a  life  and  personality 
should  be  a  challenge  to  all  of  us  as  we  face  the  future. 

The  passage  of  time  this  past  year  has  cut  deeply  into  the  ranks  of  those  that 
this  Association  has  honored  and  who  have  by  their  work  helped  to  make  the  Association 
what  it  is.  In  addition  to  Mr.  Fanning,  there  passed  on  during  the  year  Past-President 
Storey,  Past-President  Downs,  Past-President  Neubert,  Past-President  Irwin,  Director 
Faries  and  others.  These  losses  are  keenly  felt;  they  should  make  us  pause  amid  the 
confusion,  strife  and  uncertainty  of  the  present  day  and  realize  that  indeed  "Life  is  real 
and  Hfe  is  earnest" — it  should  be  spent  in  service  and  right  living,  for  it  is  all  too  short. 
Surely  when  we  contemplate  the  worth  and  influence  of  the  lives  of  those  who  have 
gone  on,  we  should  feel  that  life  is  real  and  life  is  earnest,  and  that  we  ourselves  should 
so  conduct  our  living  and  our  thinking,  our  walking  and  our  striving  in  hne  with 
those  immortal  words  of  Bryant,  when  he  wrote: 

So  live,  that  when  the  summons  comes  to  join 

The  innumerable  caravan,  which  moves 

To  that  mysterious  realm,  where  each  shall  take 

His  chamber  in  the  silent  halls  of  Death. 

Thou  go  not,  as  the  quarry  slave  at  night, 

Scourged  to  his  dungeon ;  but  sustained  and  soothed, 

By  an  unfaltering  trust,  approach  thy  grave 

Like  one,  who  wraps  the  drapery  of  his  couch 

About  him,  and  lies  down  to  pleasant  dreams. 

Mr.  Bond,  I  have  the  honor,  on  behalf  of  the  Association,  to  hand  to  you  this 
morning  the  president's  plaque,  the  gift  of  the  Association  to  its  president,  and  to  ask 
you  to  present  it  to  Mrs.  Fanning.  The  inscription  on  the  plaque  reads: 

"The  American  Railway  Engineering  Association  here  records  its  appreciation  of 
George  Stokes  Fanning  for  his  able  administration  of  the  office  of  President  1940-41. 
With  his  winning  personality  and  the  power  to  lead,  with  unfaltering  courage  and  his 
keen  mind  and  his  will  to  do,  he  served  well." 

Vice-President  Bond:  Mr.  Hastings,  on  behalf  of  Mrs.  Fanning,  I  accept  this 
plaque  in  trust  and  for  transmission. 

For  a  few  moments  of  silent  remembrance,  I  will  ask  you  to  stand. 

(Silent  tribute) 

Vice-President  Bond:  As  stated  previously,  this  Association  also  functions  as  the 
Construction  and  Maintenance  Section  of  the  Engineering  Division  of  the  Association 
of  American  Railroads  and,  as  such,  reports  to  the  vice-president  of  operations  and 
maintenance,  Mr.  C.  H.  Buford,  who  is  with  us  this  morning. 

Mr.  Buford,  I  know  our  members  are  very  happy  to  hear  from  you;  any  remarks 
instructions,  or  reprimands  will  be  equally  welcome.  (Applause) 


AddressofC.H.Buford  775 


Address  o£  C.  H.  Buford 

Vice-President,   Operations  and   Maintenance   Department 
Association  of  American  Railroads,  Washington,  D.  C. 

When  Mr.  Bond  invited  me  to  talk  to  you  today,  there  was  doubt  in  my  mind 
about  being  able  to  accept  his  kind  invitation.  I  am  glad  things  worked  out  so  I  can 
be  with  you,  because  there  are  things  I  wanted  to  say  to  your  group  concerning  the 
current  railroad  situation. 

The  members  of  the  American  Railway  Engineering  Association,  which  is  the  Engi- 
neering Division  of  the  Association  of  American  Railroads,  are  directly  responsible  for 
the  construction  and  maintenance  of  almost  all  the  railroad  mileage  of  the  North 
American  continent.  Your  problems  are  increasing  with  the  modern  trend  toward 
higher  speeds  and  larger  locomotives.  The  successful  operation  we  have  today  is  a 
credit  to  the  manner  in  which  you  have  done  your  work. 

I  am  glad  to  know  that  the  cooperative  work  of  the  Engineering  and  Mechanical 
divisions  is  being  continued.  The  Board  of  Directors  of  the  AAR  has  authorized  an 
expenditure  of  about  $115,000  for  the  joint  study  of  counterbalance  and  its  effect  on 
track.  This  authorization  is  a  tribute  to  Professor  Talbot  and  the  committee  appointed 
by  him  to  carry  on  the  work.  This  committee  has  the  full  support  of  the  general 
committees  of  the  Engineering  and  Mechanical  divisions,  and  I  am  confident  that  the 
results  of  its  efforts  will  add  another  star  to  the  crown  that  rightfully  belongs  to 
Professor  Talbot  in  recognition  of  his  many  years  of  leadership  in  improving  the  railroad 
plant  in  this  country. 

The  officers  of  the  AAR  appreciate  the  way  in  which  you  have  handled  the  activities 
of  its  Engineering  Division  during  the  past  year.  The  address  of  your  presiding  officer 
and  reports  of  the  various  committees  show  that  your  work  is  being  handled  in  an 
excellent  manner  and  is  in  competent  hands.  In  view  of  this,  there  is  no  need  for  me 
to  repeat  what  you  already  know.  Instead,  I  want  to  talk  with  you  about  the  general 
railroad  situation. 

Transportation  and  the  Defense  Program 

Railroad  transportation  is  important  in  peace  time.  In  this  changing  world  and  in 
our  efforts  to  strengthen  the  defense  arms  of  our  nation,  more  people  are  reahzing  just 
how  important  it  is.  The  increasing  need  for  transportation  in  this  country  is  causing 
apparent  concern  to  some  writers  and  others  who  are  referred  to  as  "transportation 
experts."  It  is  fuel  for  the  flame  of  a  small  group  who  openly  or  in  their  hearts  hope 
for  government  ownership  of  the  railroads.  This  group  usually  plant  their  feet  firmly 
on  what  happened  in  1917  and  1918.  They  ignore  the  lessons  the  railroads  learned 
from  that  experience  and  the  improvements  that  have  been  made  since  then,  and 
they  point  a  finger  of  doubt  at  the  railroads'  ability  to  handle  business  resulting  from 
the  national  defense  program. 

As  railroad  officers,  you  will  hear  of  some  of  these  things;  therefore,  I  want  to 
review  briefly  what  happened  in  1917  and  1918,  the  changes  that  have  taken  place  and 
what  the  railroads  are  prepared  to  do  in  the  future. 

What  was  the  situation  immediately  preceding  the  last  World  War,  and  what  were 
the  underlying  causes  of  the  transportation  difficulties  at  that  time?  In  1916,  there  was 
no  strong  central  railroad  organization  with  authority  to  meet  any  transportation 
emergency.  With  the  increase  in  business  due  to  the  war  in  Europe,  some  difficulties 
were  encountered  and  an  effort  was  made  to  set  up  an  organization  to  handle  the 
situation.  The    Railroad    War    Board,    created    immediately    after    America    entered    the 


776  Business   Session 


war,  did  some  excellent  work,  but  due  to  conditions  beyond  its  control,  it  had  little 
chance  to  function  effectively.  These  conditions  are  covered  and  confirmed  in  the  reports 
of  the  director  general  of  railroads  and  in  the  annual  report  for  the  fiscal  year  1919 
of  Brigadier  General  Frank  T.  Hines,  who  was  the  chief  of  transportation  service  of 
the  United  States  army.  I  shall  not  give  in  detail  the  many  difficulties  listed,  because 
they  all  add  up  to  one  thing:  Railroad  cars  were  used  for  storage  instead  of  for  trans- 
portation purposes. 

No  Basis  for  Comparison 

Some  people  who  analyze  the  railroad  situation  today  apparently  assume  that 
conditions  in  the  railroad  industry  are  the  same  as  those  which  existed  in  1917  and 
1918.  The  difference  in  the  conditions  then  and  now  is  the  underlying  cause  of  the 
erroneous  conclusions  that  some  investigators  reach.  There  is  no  basis  for  a  purely 
statistical  comparison  of  the  two  periods,  and  there  is  no  justification  for  the  assumption 
that  the  same  difficulties  will  arise  again. 

Today,  the  railroads  have  a  strong  central  organization  that  is  authorized  to  act 
for  them  in  any  emergency.  This  organization — the  Association  of  American  Railroads — 
has  been  working  with  the  army,  the  navy  and  shippers  over  a  long  period  of  years 
on  plans  designed  to  avoid  any  possibility  of  transportation  difficulties  which  might 
arise.  The  railroads  are  at  least  20  years  ahead  in  their  planning,  and  a  few  facts  in 
regard  to  this  might  be  of  interest  to  you. 

Take  the  port  situation:  Late  in  1917,  practically  all  the  Atlantic  ports  were 
congested;  thousands  of  cars  loaded  with  overseas  freight  were  held  back  in  the  country 
because  all  yards  near  the  ports  were  full  of  loaded  cars  that  could  not  be  unloaded. 
On  June  11,  1918,  an  export  control  committee  was  organized  and  was  successful  in 
cleaning  up  the  accumulation,  and  thereafter  regulated  the  movement  in  a  satisfactory 
manner. 

On  November  15,  1939,  the  Car  Service  Division  of  the  Association  of  American 
Railroads  established  its  Port  Control  Office.  This  organization  was  created  due  to 
increasing  export  movement  caused  by  the  war  in  Europe.  Since  its  establishment,  there 
have  been  months  when  the  movement  through  the  Port  of  New  York  was  almost  equal 
to  the  movement  through  this  same  port  during  the  last  World  War.  Yet,  there  has 
been  no  congestion,  and  at  this  port,  as  well  as  at  all  other  ports  in  the  United  States, 
cars  are  being  unloaded,  on  the  average,  within  the  tariff-free  time.  The  manager  of 
port  traffic  has  an  advisory  committee  of  competent  railroad  officers  and  works  with  the 
railroads  and  ocean  shipping  agencies  in  bringing  about  this  satisfactory  condition.  The 
free  flow  of  commerce  through  the  ports  has  been  accomplished  by  cooperation,  and 
it  has  not  been  necessary  to  use  the  embargo  and  permit  system  which  can  be  employed 
to  arbitrarily  control  any  emergency. 

Desired  Results  Being  Obtained 

The  creation  of  this  port  control  agency  was  not  an  accident.  It  was  the  carrying 
out  of  a  plan  that  has  been  in  existence  for  years — a  plan  designed  to  prevent  condi- 
tions such  as  existed  at  the  time  the  federal  export  control  committee  was  formed  in 
1918.  It  has  been  effective  and  has  obtained  the  desired  results.  It  is  now  in  a  position 
to  handle  promptly  any  emergency  that  might  develop  at  any  port  in  the  United  States. 

Under  the  Railroad  Administration  during  the  last  World  War,  some  arbitrary 
measures  were  used.  Orders  regarding  maximum  loading  of  cars  were  issued,  and  higher 
per  diem  rates  were  established.  These  steps  were  taken  to  increase  the  effective  use  of 
cars  for  transportation   purposes.  Some  people  say   that   the   railroads   should   reinstate 


Address   of    C.    H.    Buford 777 

these  restrictions;  that  it  is  necessary  because  there  has  been  no  improvement  in  the 
length  of  time  that  cars  are  in  the  hands  of  shippers.  We  have  a  record  of  the  time 
shippers  hold  cars  for  loading  and  unloading,  and  detention  is  measured  pretty  well 
by  the  demurrage  account.  If  shippers  had  held  cars  as  long  in  1939  as  they  did  in 
1920,  they  would  have  paid  over  14  million  dollars  more  for  demurrage  than  they 
actually  did  pay  in  1939. 

Prompt  Unloading  Essential 

Another  situation  we  are  watching  closely  is  the  large  construction  jobs  being 
done  for  the  army  and  the  navy.  Our  last  report  was  for  projects  totaling  more  than 
$1,150,000,000.  Cars  were  being  unloaded  in  an  average  of  about  a  day  and  a  half. 
Spot  checks  made  at  various  industries  indicate  that  a  good  job  is  being  done  in  unloading 
cars  promptly.  There  is  no  need  at  the  present  time  for  any  kind  of  restrictions  on 
shippers,  and  we  do  not  want  to  place  any.  We  believe  the  mutual  interest  of  carriers 
and  shippers  will  make  it  possible  to  get  the  desired  results  by  cooperation,  and  we 
will  continue  our  present  plan  unless  conditions  necessitate  a  change.  I  hope  those  of 
you  here  today  who  have  charge  of  maintenance  work  will  resolve  to  do  as  well  in 
using  equipment  as  shippers  are  doing,  and  after  making  that  resolve,  you  will  arrange 
for  current  checks  of  cars  under  load  with  company  material  to  see  that  a  good  job 
is  done. 

About  the  largest  shipper  in  our  country  today  is  the  United  States  government. 
The  Army,  the  Navy  and  those  engaged  in  national  defense  work  are  moving  large 
quantities  of  materials.  During  the  last  World  War,  shipments  for  the  government 
caused  a  lot  of  trouble.  The  indiscriminate  use  of  priorities  for  shipment  with  no 
place  to  unload  the  cars  was  the  principal  source  of  trouble.  Plans  were  made  and 
are  in  effect  now  to  avoid  this.  The  Car  Service  Division  of  the  ARR  has  a  Military 
Transportation  Section.  The  manager  of  the  section,  with  a  competent  staff,  is  located 
in  the  office  of  the  quartermaster  general  of  the  United  States  army  at  Washington, 
D.  C,  and  is  the  contact  for  all  railroads  in  looking  after  the  transportation  needs  of 
the  army  and  the  navy.  It  has  not  been  necessary  to  resort  to  any  form  of  priority 
in  movement  of  any  business  for  the  government,  and  we  do  not  think  any  priorities 
will  be  needed. 

During  the  last  World  War,  there  was  no  organization  of  railroads  and  shippers. 
We  now  have  13  regions  in  the  United  States  where  there  is  a  Shippers'  Advisory 
Board  cooperating  with  the  railroads  in  each  area.  These  regions  are  represented  in 
a  national  board  which  looks  after  the  interest  of  shippers  in  the  United  States.  Each 
board  in  the  group  furnishes  advance  quarterly  estimates  of  the  prospective  carioading 
in  its  territory.  These  estimates  are  the  best  forecast  for  future  loadings  that  have  ever 
been  devised,  and  are  valuable  to  the  Car  Service  division  in  its  efforts  to  maintain  an 
adequate  car  supply  for  all  sections  of  the  country. 

I  will  not  take  up  more  of  your  time  in  outlining  things  that  have  been  done  to 
avoid  the  sort  of  transportation  difficulties  that  were  encountered  in  1917.  The  lessons 
we  learned  then  have  not  been  forgotten,  and  are  a  valuable  guide  for  setting  up 
safeguards  for  the  future. 

Facilities  Are  Adequate 

After  a  careful  analysis,  I  am  convinced  that  the  main  line,  yard  and  terminal 
capacity  of  our  railroads  is  more  than  adequate  for  any  business  that  will  develop  as 
a  result  of  the  national  defense  program.  The  only  increase  that  may   be  needed  will 


778  Business    Session 


be  in  equipment.  The  need  for  equipment  is  directly  related  to  the  business  to  be 
moved,  and  this  problem  has  given  us  the  most  concern.  We  have  set  up  the  machinery 
to  provide  a  continuous  and  accurate  flow  of  information  on  future  business.  Our 
estimates  have  indicated  that  the  defense  load  will  not  exceed  eight  percent  of  the 
average  commercial  load. 

Recently  Mr.  Ralph  Budd,  transportation  commissioner  of  the  Advisory  Commission 
to  the  Council  of  National  Defense,  made  public  estimates  of  increased  traffic  for  the 
years  1941  and  1942.  These  forecasts  were  based  on  estimates  of  increased  production 
furnished  by  the  Bureau  of  Research  and  Statistics  of  that  body,  covering  commodities 
representing  about  60  percent  of  the  total  carload  traffic  originated  by  the  railroads. 

The  Bureau  of  Railway  Economics  translated  these  estimated  increases  in  production 
into  terms  of  carloads  and  arrived  at  estimated  carloads  for  1941  of  39,780,237,  or 
an  increase  of  9.4  percent  over  1940.  The  estimate  for  1942  was  42,293,982  cars,  or  an 
increase  of  16.9  percent  over  1940. 

Of  course,  the  average  weekly  carloading  does  not  mean  much  from  a  standpoint 
of  car  supply.  Carloadings  throughout  the  year  vary  from  week  to  week.  The  peak 
loading  occurs  in  the  fall,  usually  in  October,  and  the  railroads  figure  on  cars  to 
handle  that  peak.  Many  thousands  of  cars  have  to  be  put  in  condition  for  this  peak 
load,  and  ordinarily  have  no  other  loading  throughout  the  year.  To  the  extent  that 
loading  can  be  increased  during  the  off-peak  weeks,  cars  can  be  used  that  are  otherwise 
idle.  The  defense  program  will  call  for  fairly  uniform  shipments,  and  will  not  cause 
the  same  percentage  of  increase  in  the  normal  peak  weeks  that  will  occur  for  the  other 
weeks  of  the  year.  This  tendency  to  flatten  out  the  loading  curve  will  facilitate  the 
movement  of  a  large  part  of  the  increased  loading  without  the  need  for  additional  cars. 

Sufficient  Cars  in  Sight 

There  are  sufficient  cars  in  sight  now  to  take  care  of  the  loading  this  year,  and 
others  are  being  ordered  as  needs  warrant.  More  cars  will  be  purchased  or  rebuilt 
as  earnings  increase.  The  equipment  purchases  that  are  being  reported  to  us  indicate 
conclusively  that  the  railroads  were  serious  when  they  assured  those  whom  they  serve 
and  the  government  of  the  United  States  that  they  would  "meet  to  the  full  the  demands 
of  commerce  and  the  needs  of  national  defense." 

The  railroad  industry  has  set  up  machinery  to  enable  it  to  cope  with  an  emergency. 
It  has  given  satisfactory  service  during  the  peak  loading  periods  of  the  past  two  years. 
It  will  be  in  shape  to  handle  all  business  that  may  develop  this  fall,  and  will  continue 
to  be  ready  at  all  times  to  meet  the  demands  of  commerce.  Still  there  are  those  who 
question  the  railroads'  abihty  to  do  the  job,  and  I  would  like  to  point  out  several 
things  that  may  have  given  them  this  impression. 

In  the  early  stages  of  the  defense  program,  a  certain  industry  was  behind  in  its 
shipping  schedule  and  reported  to  the  Procurement  Department  of  the  Army  that 
it  was  short  on  cars.  Investigation  showed  that  the  industry's  track  was  filled  with 
empty  cars.  Another  industry  also  was  behind  schedule  and  wired  the  Procurement 
Department  numbers  of  two  cars  that  supposedly  had  been  shipped.  Investigation 
showed  that  the  cars  had  not  been  loaded  and  the  empties  had  just  been  spotted. 
One  of  the  cars  was  shipped  two  days  after  the  report  that  shipment  had  been  made, 
and  the  second  car  was  shipped  four  days  later.  Facts  in  cases  of  this  sort  are  obtained 
by  wire  and  given  to  the  Procurement  Department  by  the  manager  of  the  Military 
Transportation  Section.  Such  excuses  only  serve  to  embarrass  the  industry  making  them. 


Address    of    C.    H.    Buford 779 

Unnecessary  Refinements 

Here  is  another  thing  that  might  cause  some  people  to  think  that  the  railroads 
do  not  have  sufficient  equipment.  There  are  hundreds  of  different  sizes  of  box  cars 
when  the  inside  length,  width  and  height  are  considered.  A  car  placed  on  a  shipper's 
order  may  be  one  inch  too  narrow  to  fit  the  particular  boxes  he  loads.  Plenty  of  wider 
care  are  available,  but  are  too  wide  because  he  does  not  want  to  do  any  blocking. 
Consequently,  there  is  a  shortage  of  the  particular  size  car  wanted.  Cars  are  turned 
down  because  the  length  varies  as  little  as  two  percent  from  the  actual  length  desired. 
These  cases  are  rare  and  are  not  really  car  shortages,  although  some  people  regard 
them  as  such.  I  mention  these  cases  because  someone  may  hear  a  shipper  say  he 
could  not  get  a  car,  and  without  knowing  all  the  facts,  assume  it  was  due  to  a  shortage 
of  equipment. 

There  is  one  thing  in  connection  with  transportation  that  is  causing  a  great  deal 
of  concern  to  a  lot  of  people  at  the  present  time.  This  has  to  do  with  the  winter 
wheat  crop  which  will  be  ready  for  movement  in  a  few  months.  Of  course,  much  can 
happen  to  a  gain  crop  in  a  short  while.  Because  of  the  fact  that  most  of  the  storage 
space  is  now  filled  with  grain  carried  over  from  previous  crops  and  that  there  is  at 
present  a  prospect  of  a  good  crop  of  winter  wheat,  serious  thought  is  being  given 
to  what  will  be  done  with  the  grain  when  it  is  harvested.  The  Department  of  Agri- 
culture is  studying  the  matter  and  will  probably  find  a  solution. 

Railroads  are  interested  because  the  movement  of  the  winter  wheat  crop  is  normally 
a  major  problem  in  car  supply.  We  will  have  sufficient  cars  to  move  the  crop,  but 
cannot  hope  to  provide  cars  for  storage  purposes.  It  is  absolutely  necessary  that  proper 
facilities  be  supplied  for  storing  the  grain,  because  cars  will  not  be  spotted  for  loading 
unless  they  can  be  unloaded  at  destination.  To  handle  it  otherwise  would  only  tie 
up  cars  that  will  be  needed  by  other  shippers  of  important  commodities.  I  am  confident 
that  the  problem  will  be  solved,  and  mention  it  simply  because  it  is  the  only  thing 
I  know  of  at  this  time  that  might  be  troublesome. 

Avoid  Hysteria 

On  previous  occasions,  I  have  urged  that  people  avoid  hysteria  in  connection 
with  our  defense  efforts.  We  are  under  terrific  pressure  to  speed  up  production,  and 
some  people  get  excited  and  become  hysterical  under  such  conditions. 

Your  continued  work  with  a  railroad  requires  that  you  do  not  become  hysterical 
under  pressure,  because  railroading  is  necessarily  a  pressure  business.  You  are  well-fitted 
to  think  clearly  in  these  strenuous  times,  and  I  hope  you  will  lose  no  opportunity  to 
correct  any  loose  talk  you  hear  about  the  railroads  and  their  ability  to  cope  with 
any  transportation  situation. 

Vice-President  Bond:  On  behalf  of  our  Association,  I  want  to  thank  you  for  that 
interesting  and  instructive  address.  We  know  you  are  here  at  some  personal  inconvenience, 
and  we  appreciate  it  all  the  more. 


780  Reportof   Tellers 


Report  of  the  Tellers 

(Presented  Wednesday  Afternoon,  March  12,  1941) 

We,  the  Committee  of  Tellers,  report  the  following  as  the  result  of   the  count  of 
the  ballots: 

For  President: 

F.  L.  C.  Bond  934 

For  Vice-President: 

W.  F.  Cummings  911 

Scattering    18 

For  Directors  (Three  to  be  elected): 

F.  S.  Schwinn   563 

E.  T.  Howson   519 

B.  R.  Kulp  425 

J.  F.  Pringle    376 

W.  B.  Irwin   262 

R.  R.  Cummins  209 

H.  A.  Aalberg   183 

L.  C.  Frohman  1 73 

H.  F.  Brown   153 

Scattering    2 

For  Nominating  Committee  (Five  to  be  elected): 

A.  E.  Perlman   596 

C.  H.  R.  Howe  594 

J.  A.  Lahmer   569 

A.  D.  Kennedy    504 

Miss  Olive  W.  Dennis   446 

H.  F.  King   428 

E.  W.  Caruthers 417 

R.  D.  Garner   413 

D.  B.  Thompson   342 

M.  J.  J.  Harrison  336 

Scattering    9 

Respectfully  submitted, 

The  Committee  of  Tellers, 

R.  C.  Bardwell,  Chairman  R.  A.  Morrison  D.  C.  Teal 

J.  C.  Bradley  F.  E.  Morrow  J.  N.  Todd 

W.  T.  Dorrance  A.  B.  Pierce  R.  E.  Warden 

R.  N.  Foster  W.  C.  Pinschmidt  J.  B.  Wesley 

H.  L.  McMuUin  H.  E.  Silcox  A.  R.  Wilson 

R.  M.  Stimmel 


ClosinRScssion  781 


Closing  Session,  Thursday  Afternoon,  March  13,  1941 

Vice-President  Clarke  (in  the  chair):  Is  there  any  further  business  to  come  before 
the  convention? 

W.  G.  Nusz  (Illinois  Central):   I  would  like  to  present  a  resolution: 

Be  it  Resolved,  That  the  American  Railway  Engineering  Association,  in  convention 
assembled,  express  its  thanks  to  C.  H.  Buford  for  his  constructive  address  at  the  opening 
session  of  our  convention  and  for  his  cooperation  with  our  Association  throughout  the 
year  in  his  capacity  as  vice-president,  Operations  and  Maintenance  Department,  Associa- 
tion of  American  Railroads.  I  move  its  adoption. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

D.  J.  Brumley  (Illinois  Central):  I  have  the  following  resolution: 

Be  it  Resolved,  That  the  American  Railway  Engineering  Association,  in  convention 
assembled,  extend  its  appreciation  to  the  National  Railway  Appliances  Association  for 
the  constructive  exhibit  of  materials  and  equipment  applicable  to  the  construction  and 
maintenance  of  railway  roadway  and  structures,  presented  concurrently  with  the  con- 
vention, which  exhibit  has  added  much  to  the  educational  value  of  our  meeting. 

I  move  the  adoption  of  the  resolution. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

E.  M.  Hastings  (Richmond,  Fredericksburg  &  Potomac) :  I  would  like  to  offer  the 
following  resolution: 

Be  it  resolved.  That  the  American  Railway  Engineering  Association,  in  convention 
assembled,  record  its  appreciation  to  Hon.  Clarence  F.  Lea  for  his  constructive  address 
at  our  luncheon,  which  address  emphasized  to  our  members  the  problems  involved  in 
the  framing  of  legislation  to  provide  equality  of  opportunity  to  the  railways  and  other 
agencies  of  transportation.  I  move  the  adoption  of  the  resolution. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Vice-President  Clarke:  If  there  is  no  further  business  to  come  before  the  con- 
vention, I  will  ask  Past-President  Wilson  and  Past-President  Brumley  to  please  conduct 
President-Elect  Bond  to  the  rostrum. 

(President-Elect  Bond  was  escorted  to  the  rostrum.) 

Vice-President  Clarke:  I  will  ask  Past-President  Campbell,  I  believe  the  oldest 
past  president  here  and  who  was  president  when  I  became  a  member  of  this  Associa- 
tion, to  install  President-Elect  Bond. 

Past-President  Campbell:  My  dear  Mr.  Bond,  it  is  my  privilege  to  notify  you 
that,  as  expressed  in  the  election  returns,  the  American  Railway  Engineering  Association 
has  elected  you  to  be  its  president  during  the  ensuing  twelve  months. 

Your  qualifications  for  this  high  position  are  so  eminent  and  obvious  that  it  is 
unnecessary  to  elaborate  them.  There  is  an  additional  reason  why  this  Association 
delights  at  this  time  to  so  honor  you. 

The  jurisdiction  and  the  membership  of  this  Association  extend  far  beyond  the 
limits  of  the  United  States.  From  time  to  time  it  has  delighted  to  give  recognition 
and  honor  to  Canada  through  the  membership  from  that  neighboring  country,  so  that 
we  have  had  the  pleasure  of  being  presided  over  by  a  president  from  that  land. 

Therefore,  by  the  authority  of  the  American  Railway  Engineering  Association, 
I  declare  you  to  be  its  duly  elected  president  for  the  ensuing  twelve  months  and,  as 
the  emblem  of  your  authority  and  jurisdiction,  I  have  the  honor  to  present  to  you 
this  gavel.  (Applause) 

(President  Bond  assumed  the  chair.) 

President  Bond:  Mr.  Campbell  and  Gentlemen:  I  am  indeed  very  much  moved 
by  the  kind,  flattering  and,  to  a  certain  extent,  neighborly  remarks  of  our  past-president, 

A 


782  Business    Session 


Mr.  Campbell,  with  whom  I  have  had  the  pleasure  of  being  associated  at  intervals 
over  a  comparatively  long  period  of  years.  In  my  earliest  recollections  of  the  AREA 
I  remember  Mr.  Campbell. 

In  accepting  the  highest  office  at  the  disposal  of  this  distinguished  and  able  Asso- 
ciation, I  am  sincerely  conscious  of  the  high  honor  and  the  distinction  which  you  have 
thus  seen  fit  to  bestow. 

It  is  also  with  a  very  deep  sense  of  the  responsibility  which  devolves  upon  me, 
following  as  I  do  a  long  line  of  distinguished  predecessors  who  in  turn  have  each  felt 
their  responsibility  and  their  obUgation  to  do  all  in  their  power  to  promote  the  welfare, 
the  continuing  and  the  progressive  welfare  of  our  Association.  But  my  feeling  of 
unworthiness  is  relieved  when  I  look  around  at  the  Board  of  Direction  and  also  the 
membership  from  whom  we  have  always  received  the  most  able  and  helpful  advice. 

Any  change  naturally  involves  a  certain  amount  of  a  bump,  and  it  is  with  sincere 
expressions  of  regret  that  we  note  the  retirement  of  our  friends  Mr.  Geyer,  Mr.  Layng 
and  Mr.  Brennan,  who  have  been  so  active  on  the  Board  committees  and  whose  work 
has  always  been  of  outstanding  eminence  and  abiUty. 

We  also  have  to  note  the  new  vice  president,  Mr.  Cummings,  and  we  also  have 
Mr.  Howson,  Mr.  Kulp  and  Mr.  Schwinn,  who  have  been  elected  to  the  Board  of 
Direction.  May  I  ask  those  gentlemen  to  kindly  stand  so  that  we  can  see  whom  we 
have  elected?  (Applause) 

I  would  also  like  to  pay  my  sincere  tribute  to  our  very  able  secretary.  Following 
the  tragedy  that  met  us  during  the  past  year,  I  cannot  pay  tribute  too  high  to  the 
able  assistance  which  I  personally  and  we  all  received  from  our  secretary.  (Applause) 

The  final  registration  is  as  follows:  For  1941  we  had  692  members  and  526  guests, 
making  a  total  of  1,218.  Last  year  we  had  719  members  and  483  guests,  making  a 
total  of  1,202.  That  means  we  had  16  more  this  year  than  last,  although  there  are 
fewer  members  this  year  and  more  guests. 

I  have  to  explain  that  a  good  many  of  your  members  from  your  neighboring 
country  to  the  north  have  found  it  exceptionally  difficult  to  attend  this  year  and, 
on  their  behalf,  I  will  ask  you  to  excuse  those  who  are  not  here  because  I  think  you 
will  find  that  they  had  ample  and  abundant  reasons  for  not  being  able  to  get  to 
the  Association  meeting. 

If  there  is  nothing  further,  I  will  now  call  the  meeting  adjourned. 

(The  meeting  adjourned  at  four-five  o'clock.) 


Federal  Regulation  of  Transportation 

An  Address  Presented  Before  the  Annual  Luncheon  on   March   12,   1941 

By  Hon.  Clarence  F.  Lea 

Chairman,   Committee   on   Interstate   and   Foreign   Commerce, 
National  House  of  Representatives 

I  am  going  to  speak  to  you  on  the  subject  of  "Federal  Regulation  of  Transporta- 
tion." I  recognize  I  am  speaking  to  men  who  are  familiar  with  the  mechanics  of 
construction  and  operation  of  railroads.  I  think  of  an  engineer  as  a  man  who  devotes 
himself  to  planning  and  constructing  useful  things  that  better  serve  people.  I  think 
of  him  as  carrying  out  plans  that  overcome  the  handicaps  of  nature.  He  adds  to  the 
sum  of  human  comfort  and  advancement.  I  think  of  a  railroad  engineer  as  a  man 
who  has  designed  a  modern  terminal   with   its  freight  and   car-handling  devices  and 


Address    of    Hon.    Clarence    F.    Lea 783 

arrangements,  who  has  defied  the  broad  and  turbulent  stream  and  over  it  constructed 
a  magnificent  bridge  on  which  people  and  materials  pass  in  rapid  safety  and  comfort. 
He  has  thrown  the  steel  rail  lines  across  the  desert,  laid  them  along  the  banks  of  the 
plunging  mountain  stream  imbedded  in  narrow  and  tortuous  canyons.  He  has  designed 
locomotives  that  pull  their  great  loads  from  the  four  corners  of  the  republic  across 
the  valleys  and  along  the  very  rim  of  the  jagged  peaks  of  our  greatest  mountains,  to 
the  other  side  of  the  continent.  He  is  a  constructor,  a  builder,  a  benefactor.  His  job 
is  never  ended.  There  is  something  new  yet  to  be  done,  another  improvement  to  be 
made,  another  purpose  to  be  accomphshed. 

So  far  as  the  federal  government  is  concerned,  it  has  staked  its  future  relation  to 
transportation  upon  a  policy  of  regulation.  Under  a  policy  of  regulation  founded  on 
intelligent  treatment  of  our  carriers  with  fairness  and  according  to  the  economic  worth 
of  their  services,  the  interest  of  the  government  and  all  our  transportation  agencies  lie 
parallel  with  the  interest  of  the  people  of  the  nation.  The  success  of  that  policy  is 
dependent  upon  public  understanding  and  support. 

Authority  to  Regulate  Commerce 

Outside  of  the  taxing  power  given  to  the  federal  government,  there  is  probably 
no  other  one  clause  in  the  Constitution  which  more  directly  concerns  the  economic 
affairs  of  the  country  than  that  provision  which  gives  Congress  authority  to  regulate 
commerce  with  foreign  nations  and  among  the  several  states. 

The  Articles  of  Confederation,  under  which  this  nation  functioned  prior  to  the 
adoption  of  the  Constitution,  had  many  weaknesses,  one  of  which  was:  It  had  no 
control  over  interstate  commerce,  no  authority  to  promote  it  or  to  protect  it  against 
unfriendly  action  of  the  individual  states. 

The  people  who  had  self-sacrificingly  and  heroically  cooperated  to  bring  the  Revo- 
lutionary War  to  a  successful  conclusion  soon  thereafter  found  themselves  in  unhappy 
disagreement  with  each  other.  Some  of  the  states  were  attempting  to  restrict  or  bar 
the  commerce  of  their  sister  states  in  favor  of  their  own.  Retaliatory  legislation  with 
bitter  resentments  followed. 

In  recent  times,  a  barge  load  of  potatoes  merely  passing  up  the  Danube  River  to 
an  interior  country  was  subject  to  a  tax  by  lower  states  through  which  that  river 
flowed.  So  before  the  Constitution,  an  ox-drawn  wagon  bringing  firewood  from  Con- 
necticut to  keep  Old  New  York  warm  could  not  pass  over  the  boundary  line  of  that 
state  until  it  had  paid  its  toll  at  a  custom  house.  A  charge  was  made  in  New  York 
on  products  entering  New  Jersey  and  other  states.  In  a  feeble  effort  of  retaliation, 
New  Jersey  imposed  a  tax  on  the  New  York  lighthouse  maintained  at  Sandy  Hook. 
Similar  irritations,  with  resulting  sectional  hatreds,  created  a  compelling  demand  for 
a  new  federal  government.  The  bitterness  of  these  trade  difficulties  developed  to  the 
point  where  representatives  of  some  states  went  so  far  as  to  assert  that  they  would 
rather  ally  themselves  with  a  foreign  country  than  with  some  of  their  sister  states. 

Common  Interest  in  "Regulation  of  Trade" 

On  January  21,  1786,  a  General  Assembly  of  Virginia  appointed  commissioners 
to  meet  with  such  commissioners  as  might  be  appointed  by  other  states  "to  take 
into  consideration  the  trade  of  the  United  States;  to  examine  the  relative  situations 
and  trade  of  the  said  states;  to  consider  how  far  a  uniform  system  in  their  commercial 
regulations  may  be  necessary  to  their  common  interest  and  their  permanent  harmony ; 
and  to  report  to  the  several  states,  such  an  act  relative  to  this  great  object,  as  when 


784  Business    Session 


unanimously  ratified  by  them  will  enable  the  United  States  in  Congress,  effectually  to 
provide  for  the  same." 

This  action  was  followed  by  the  Annapolis  convention  which  met  September  11, 
1786,  and  the  Virginia  resolution  was  given  the  concurrence  of  Virginia,  Delaware, 
Pennsylvania,  New  Jersey  and  New  York  for  the  same  purpose.  New  Jersey,  in  appoint- 
ing its  commissioners,  suggested  the  consideration  of  "other  important  matters"  which 
was  the  course  followed  by  the  constitutional  convention.  As  a  result  of  the  action  of 
these  states,  the  constitutional  convention  assembled  and  our  Constitution  was  finally 
written  and  ratified. 

Regulation  of  commerce  by  the  federal  government  was  designed  to  provide  a 
system  of  uniform  regulation,  or  rules,  governing  commerce  for  the  whole  nation  to 
lift  regulation  above  the  petty,  provincial  and  retaliatory  action  of  the  individual 
states.  It  was  intended  to  encourage,  protect  and  make  commerce  free.  In  a  few  words 
written  into  the  Constitution,  Congress  was  given  authority  to  regulate  commerce 
with  foreign  nations  and  among  the  several  states. 

On  December  14,  1795,  the  House  of  Representatives  created  a  standing  Committee 
on  Commerce  and  Manufacturers.  That  committee  is  the  original  predecessor  of  the 
persent  House  Committee  on  Interstate  and  Foreign  Commerce.  That  was  91  years 
before  the  Interstate  Commerce  Act  was  written.  Part  of  the  work  of  that  committee 
was  to  exercise  jurisdiction  under  the  clause  authorizing  Congress  to  regulate  commerce. 

More  Power  to  Federal  Government 

The  original  thirteen  states  reluctantly  yielded  to  the  federal  government  the 
powers  that  were  necessary  to  make  it  virile  and  effective.  The  constitution  took  from 
each  state  its  absolute  power  to  control  interstate  commerce  within  its  borders.  In  the 
main,  it  gave  that  power  to  the  federal  government.  It  intended  to  deprive  the  states 
of  the  power  to  hamper  and  harass  the  commerce  of  their  sister  states  and  bring  it 
into  federal  protection  and  regulation.  It  gave  to  this  commerce  the  freedom  of  the 
protection  that  the  federal  government  could  give.  It  relieved  each  state  against  the 
burdensome  and  destructive  action  of  every  other  state.  This  clause  of  the  Constitution 
was  established  to  promote  and  protect  commerce.  That  is  still  the  legitimate  end 
of  federal  regulation.  We  deliberately  seek  liberty  of  commerce  within  the  restraints 
of  law  rather  than  license  without  the  restraint  that  the  forty-eight  states  could  impose. 

The  Constitution  was  written  when  transportation  and  communication  were  difficult. 
There  were  no  railroads,  no  motor  vehicles,  no  steamboats,  no  airplanes,  no  modern 
highways,  no  telegraphs,  no  telephones,  radios,  electric  or  pipe  lines.  There  were  no 
great  industrial  enterprises.  America  was  an  agricultural  country.  Only  five  percent  of 
the  population  lived  in  cities.  The  farm  was  an  economic  unit  of  production,  manu- 
facture and  consumption.  It  had  little  dependence  on  the  markets  of  other  states. 
There  was  no  mass  production.  The  modern  corporate  system  of  doing  business  was 
then  practically  unused.  The  financing  of  great  business  enterprises  through  the  wide- 
spread sale  of  their  securities  on  market  exchanges  was  not  part  of  the  economic  life. 

The  new  government  under  the  Constitution  did  not  hasten  to  assert  its  powers  over 
commerce.  Placing  the  power  of  control  of  interstate  commerce  beyond  the  destructive 
hands  of  the  states  in  itself  largely  accomplished  the  protection  that  was  needed  in 
the  early  days  of  the  republic.  Congress  passed  only  minor  acts  as  to  such  commerce 
prior  to  the  Civil  War.  It  is  said  that  in  over  seventy  years  preceding  the  Civil  War 
only  about  twenty  cases  involving  the  interstate  commerce  clause  reached  the  Supreme 
Court.  The  first  great  step  in  federal  regulation  was  taken  when  the  Interstate  Commerce 
.\ct  was  passed  in  1887. 


Address    of    Hon.    Clarence    F.    Lea  785 


Changes  that  Led  to  Interstate  Commerce  Act 

Someone  reviewing  the  history  of  the  exercise  of  power  under  the  interstate  com- 
merce clause  states  that  it  was  not  until  the  Interstate  Commerce  Commission  was 
created  "that  the  sleeping  giant"  of  federal  regulation  was  awakened.  That  statement 
was  probably  justified.  A  more  compelling  reason,  however,  for  regulation  arose  out  of 
the  economic  changes  coming  with  the  decades  following  the  Civil  War. 

As  the  nation  advanced  from  its  primitive  to  its  modern  conditions,  these  changing 
developments  brought  into  sharper  conflict  the  original  division  of  state  and  federal 
powers  as  established  by  the  Constitution.  It  was  rail  transportation  with  its  lines 
running  across  state  boundaries  serving  the  needs  of  this  newly  developed  economic 
world  that  first  obviously  emphasized  the  new  interstate  relations. 

As  the  rail  Unes  advanced,  10,000  communities  in  the  United  States  welcomed  their 
advent  wdth  brass  bands  and  barbecues.  The  rail  Unes  offered  these  communities  the 
best  known  transportation,  a  spreading  market  for  their  products,  a  new  day  for  their 
community.  And  so  it  was.  Today  when  we  travel  over  some  sections  of  our  country, 
we  may  see  abandoned  roadbeds  or  rusty  rails.  They  are  reminders  of  the  days  of 
daring  enterprise,  of  progress  and  decline. 

The  Civil  War  was  followed  by  a  marvelous  period  of  railroad  construction  and 
expansion,  including  over-expansion  and  in  many  cases  improvident  dupUcation  of 
facihties.  Abuses  in  financing  operations  were  notorious  and  unjust  discriminations  and 
rebates  grew  up  that  affected  shippers,  roads,  industries  and  sections.  These  abuses 
created  the  demand  for  federal  regulation  and  reflect  the  type  of  regulation  adopted. 
The  general  purpose  of  the  early  legislation  was  to  protect  shippers,  communities  and 
the  public  against  the  established  abuses  of  railway  operations.  Reflecting  this  purpose, 
the  original  Interstate  Commerce  Act  was  directed  principally  at  requiring  rates  to  be 
reasonable,  and  the  prohibition  of  unjust  discriminations,  rebates  and  monopolistic 
agreements. 

The  last  25  years  have  seen  a  great  change  in  our  transportation  system.  At  the 
conclusion  of  the  World  War,  the  Panama  Canal  was  an  open  water  route  from  the 
Atlantic  to  the  Pacific  and  made  intercoastal  water  transportation  available  to  over 
one-half  of  the  population  of  the  country.  Three  milhon  miles  of  highways,  many  of 
them  paved,  made  a  net-work  over  the  nation.  Thirty-two  miUion  motor  vehicles  are 
operated  on  these  highways  including  several  million  trucks.  Twenty-five  years  ago 
these  roads  were  only  feeders  and  not  competitors  to  the  rail  lines.  Today,  they  are 
substantial  competitors  of  every  form  of  transportation.  The  pipe  line  and  the  airplane 
have  entered  the  transportation  field  in  a  substantial  way.  A  division  of  the  traffic 
and  a  competition  of  rates  with  a  long  depressed  business  period  in  recent  years  have 
all  been  problems  for  our  carriers  and  the  country. 

Changing  Economic  Conditions 

In  that  quarter  of  a  century,  regulation  has  taken  a  more  embracing  form.  The  old 
abuses  have  been  largely  eradicated.  Changing  economic  conditions  have  made  the 
carriers  themselves  objects  of  a  protective  care  of  the  government.  Regulatory  protec- 
tion is  no  longer  confined  to  the  pubHc  as  against  the  carrier.  Now,  without  deserting 
the  public,  regulation  gives  the  carrier  protection  against  abuses  that  may  injure  or 
destroy  him.  Surplus  facilities,  present  and  potential  intensive  competitive  conditions, 
and  a  long  depression  have  emphasized  the  need  of  coordination  of  facilities  and  of 
placing  the  game  of  competition   under  fair  rules. 

The  owners  of  transportation  facihties,  including  their  security  owners,  are  entitled 
to  that  just  consideration  that   the  government  should  give  to  ownership  everywhere. 


786  Business    Session 


Regulation  does  not  place  on  the  government  the  obligation  to  support  unwarranted 
or  improvident  investments  nor  to  maintain  a  transportation  unit  after  it  has  lost  its 
economic  value  to  transportation  needs.  The  pubHc  should  be  concerned,  however,  in 
the  maintenance  of  useful  facilities  and  securing  a  fair  return  to  their  owners.  The 
maintenance  of  our  transportation  system  on  the  basis  of  private  ownership  ultimately 
depends  on  a  showing  that  an  investment  in  such  facility  is  reasonably  secure  and  offers 
a  fair  return. 

We  have  had  abandonments  and  reductions  of  rail  service  to  an  important  extent. 
We  have  the  threat  of  gradual  elimination  of  more  branch  lines  and  then  more  important 
lines.  A  degree  of  such  abandonments  is  inevitable  and  undoubtedly,  in  some  instances, 
necessary.  There  is  a  danger,  however,  that  abandonments  may  occur  based  on  the  ill- 
experience  of  an  unfortunate  period,  where  the  maintenance  of  such  lines  under  proper 
regulation  might  be  warranted  from  the  longtime  viewpoint. 

The  Test  of  Economic  Regulation 

The  test  of  economic  regulation  for  the  next  ten  years  depends  upon  how  success- 
fully it  may  preserve  useful  transportation,  prevent  its  substitution  by  a  less  qualified 
service  and  so  stabilize  the  industry  that  sources  of  funds  for  continuing  operations  and 
replenishment  of  capital  shall  not  dry  up.  In  other  words,  the  desirable  remedy  is  to 
put  the  carriers  on  a  self-supporting,  healthy  basis. 

If  this  end  shall  be  accomplished,  the  responsibility,  to  no  small  degree,  must 
rest  upon  the  Interstate  Commerce  Commission  as  our  regulatory  body.  Its  members 
are  men  of  high  ability,  integrity  and  purposes.  They  should  be  given  the  benefit  of 
every  aid  that  might  contribute  to  the  success  of  their  work.  Their  task  will  call  for 
enlarged  responsibilities,  greater  initiative  and  new  approaches  to  some  of  their  problems. 

People  who  use  a  railroad  want  it  to  give  efficient  service  at  reasonable  prices;  the 
laboring  man  wants  it  to  give  employment;  the  farmer  and  producer  want  it  as  an 
outlet  to  their  market.  Some  local  communities  want  it  to  be  their  principal  taxpayer. 
The  rail  lines  have  served  those  purposes  fairly  well. 

The  original  motive  for  the  construction  of  the  railroad  was  the  hope  of  a  secure 
and  profitable  investment.  The  weakest  point  in  our  transportation  system  of  recent 
years  has  been  the  inability  of  a  large  number  of  our  railroads,  of  our  shipping  lines 
and  of  our  commercial  highway  carriers  to  keep  red  off  their  balance  sheets.  The  long 
depression  affected  transportation  lines  much  as  it  has  all  business.  The  common  carriers, 
however,  had  less  opportunity  to  reduce  fixed  charges  and  adjust  outgo  to  income  than 
most  lines  of  business. 

Though  regulated,  we  cannot  expect  to  reUeve  our  carriers  in  periods  of  depression 
as  well  as  in  periods  of  prosperity  from  sharing  the  fate  of  the  country  they  serve.  If 
that  were  the  only  trouble,  the  problem  would  be  less  difficult. 

Notwithstanding  many  increases  of  cost,  railroads  have  introduced  new  methods 
and  modernized  equipment  and  have  given  more  efficient  service  on  reduced  charges 
during  the  last  two  decades.  Special  speed  for  emergency  freight  has  been  provided. 
Tracks  have  been  improved,  rolling  stock  suppHed,  schedules  reduced,  and  cost  lowered 
with  additional  accommodations  to  the  shippers.  Passenger  trains  have  been  stream- 
lined and  air  conditioned.  The  fact  that  all  this  has  been  done  in  the  face  of  the 
depression,  a  proportionate  reduction  of  traffic  and  increased  competition,  must  be  recog- 
nized as  an  accomplishment  creditable  to  railroad  management  of  this  period. 

If  it  be  true  that  we  have  excess  transportation  facilities  that  must  be  discarded, 
that  some  must  perish  and  some  survive,  then  the  problem  of  regulation  is  to  .see  that 


Address   of   Hon.    Clarence    F.   Lea 787 

the  conditions  under  which  some  survive  and  others  perish  must  be  under  fair  rules 
of  competition,  in  other  words,  under  a  system  of  rules  which,  as  nearly  as  possible, 
will  permit  the  carrier  economically  justified  to  survive  and  leave  failure  alone  to  those 
not  economically  justified. 

To  boil  down  the  situation  we  have  these  facts:  We  have  a  newly  developed,  highly 
competitive  situation  between  various  transportation  agencies  which  calls  for  coordina- 
tion to  protect  our  national  transportation  system  and  conduct  it  under  fair  rules  of 
competition.  In  the  second  place,  we  have  a  need  of  regulation  so  exercised  that  each 
of  these  agencies  within  its  legitimate  field  may  receive  a  fair  and  just  reward  for  the 
useful  service  it  is  performing  to  the  nation.  These  purposes  must  be  among  the  objects 
of  federal  regulation  if  we  are  to  face  the  situation  candidly. 

Transportation  Policies 

In  the  Transportation  Act  of  1940,  Congress  wrote  a  declaration  of  a  national  trans- 
portation policy.  It  is  provided  that  the  Transportation  Act  must  be  enforced  with  a 
view  of  carrying  out  those  policies.  This  is  the  first  broad  declaration  of  a  national 
policy  for  transportation  that  has  been  written  in  the  laws  of  our  country.  It  is  the 
most  modern  statement  of  the  purposes  of  regulation  that  has  so  far  found  its  expression 
in  our  federal  laws. 

Several  purposes  are  declared.  One  is  a  purpose  to  provide  for  fair  and  impartial 
regulation  of  all  modes  of  transportation.  Heretofore  we  had  some  carriers  regulated, 
some  unregulated  and  different  agencies  regulated  by  different  authorities.  This  new 
act,  with  the  exception  of  air  transportation,  places  all  our  transportation  agencies 
under  the  unified  regulation  of  the  Interstate  Commerce  Commission.  That  was  a 
conception  of  necessary  regulation  that  the  great  Judge  Cooley  had  when  he  was  made 
the  first  chairman  of  the  Interstate  Commerce  Commission  54  years  ago.  This  is  a  step 
in  the  evolution  of  regulation  of  historical  importance.  Without  any  claim  that  we 
have  reached  an  ideal  state  of  regulation,  this  is  one  step  that  materially  advances  that 
time  when  we  may  hope  to  give  regulation  its  best  test  as  to  whether  or  not  it  can 
master  the  complicated  problems  of  Federal  coordination  of  transportation. 

This  declaration  of  policy  further  declares  a  purpose  to  recognize  and  preserve  the 
inherent  advantages  of  each  mode  of  transportation.  Each  new  mode  of  transportation 
brought  under  regulation  conjured  up  some  grounds  to  fear  it  might  be  a  stepchild  to 
regulation.  It  found  some  grounds  to  claim  it  should  be  immune  from  the  powers  of 
regulation  to  which  its  competitors  were  subject. 

Each  government  agency  exercising  regulatory  powers  resisted  the  surrender  of 
those  powers  even  where  such  surrender  was  manifestly  required  for  the  purpose  of 
unifying  regulation  or  coordinating  the  transportation  agencies  of  the  country.  Each 
agency,  with  limited  exceptions,  seemed  to  regard  itself  as  a  particular  partisan  advocate 
of  its  branch  of  the  transportation  service  and  thinks  of  our  transportation  system  pretty 
much  in  the  narrow  limits  of  its  own  interest. 

America,  as  a  whole,  cannot  be  expected  to  devote  itself  to  preserving  any  uneco- 
nomic unit  of  transportation.  To  do  so  would  simply  be  against  the  rules  of  progress. 
Progress  has  an  immutable  rule  of  change  from  the  old  to  new  and  better  methods. 
All  capital  is  conscious  of  that  uncertainty  that  attaches  to  every  investment. 

Manifestly,  the  railroad  has  some  advantages  over  other  carriers.  It  is  equally 
true  that  the  truck  and  the  bus  and  the  ship  and  the  pipe  line  and  the  air  carrier  each 
offers  superior  advantage  under  some  circumstances  for  its  class  of  transportation. 
Those  inherent  advantages  are  manifestly  of  benefit  to  the  nation.  They  give  it  service; 


788  Business    Session 


they  contribute  to  the  comfort  of  the  public;  they  aid  economic  advancement.  The 
country  is  rightly  interested  in  the  inherent  advantages  in  each  of  these  types  of  carriers. 
Each  of  these  agencies  competes  for  and  shares  the  transportation  business  of  the 
country.  Our  federal  regulatory  authority  has  charge  of  the  regulation  of  their  rates. 
We  have  entrusted  the  commission  with  the  burden  of  their  regulation  with  a  view 
of  preserving  the  inherent  advantages  of  each. 

It  must  be  recognized  that  as  between  these  various  types  of  carriers  there  will 
be  a  broad  field  where  competition  in  service  may  prevail.  There  will  be  a  field  in 
which  competition  in  both  prices  and  services  will  prevail.  There  will  be  cases  where 
the  proper  adjustment  of  rates  will  give  the  traffic  to  one  carrier  instead  of  the  other. 
The  fundamental  principle  underlying  these  distinctions  is  based  on  the  just  principle 
of  the  value  of  the  service  rendered.  There  is  no  injustice  in  that  principle.  The  difficulty 
of  administering  this  principle,  it  must  be  conceded,  is  great. 

Must  Visualize  All  Agencies 

In  attempting  to  preserve  the  inherent  advantages  of  each  method  of  transporta- 
tion, we  must  visualize  all  the  agencies  of  transportation  as  included  in  the  transportation 
system  of  the  United  States,  each  having  its  useful  function  in  performing  its  part, 
which  should  not  be  obnoxious  to  the  other  agencies  of  transportation. 

Another  declared  purpose  of  our  regulation  is  to  promote  safe,  adequate  and  efficient 
service  as  a  duty  of  the  carrier  to  the  public. 

Another  purpose  is  to  foster  sound  economic  conditions  in  transportation  and  among 
the  several  carriers.  This  purpose  is  consistent  with  the  modern  trend  of  regulation. 
Once  regulation  had  in  mind  only  the  protection  of  the  users  of  the  railroad.  In  the 
face  of  modern  conditions,  we  must  recognize  the  importance  of  maintaining  sound 
economic  conditions  among  the  carriers  themselves.  The  transportation  agency,  to  fully 
perform  its  service  to  the  public,  must  be  well  and  soundly  financed.  The  public  has 
an  interest  in  seeing  that  justice  is  done  to  the  carrier.  Regulation  in  attempting  to 
protect  the  carrier  has  a  right  to  insist  that  his  operations  shall  be  conducted  with  a 
degree  of  economy,  prudence  and  integrity  that  is  conscious  of  responsibility  to  the 
public.  In  other  words,  regulation  as  it  has  developed  reaches  out  and  recognizes  a 
much  larger  field  of  the  public  interest  than  was  recognized  a  half  century  ago. 

Still  adhering  to  the  purpose  of  regulation  assigned  fifty  years  ago,  this  declaration 
of  policy  commits  regulation  to  the  maintenance  of  reasonable  charges  without  unjust 
discriminations,  undue  preference  or  advantages.  Then  again,  recognizing  the  need  of 
carrier  protection,  the  declaration  of  purpose  commits  regulation  against  unfair  or 
destructive  competitive  practices.  The  carriers  are  entitled  to  protection  against  cut- 
throat methods  of  competition.  There  is  a  further  declaration  of  purpose  to  encourage 
fair  wages  and  equitable  working  conditions.  This  is  the  statement  of  the  just  relations 
that  should  exist  between  employer  and  employe.  Then  this  declaration  concludes  by 
asserting  that  the  end  of  this  regulation  is  to  develop,  coordinate  and  preserve  a  national 
transportation  system  by  all  these  agencies  to  meet  the  needs  of  commerce  and  our 
national  defense. 

Like  all  the  rest  of  us,  carriers  hve  off  their  income. 

Rate  regulation  goes  to  the  heart  of  the  problem  of  coordination;  to  the  question 
as  to  what  units  of  transportation  shall  survive;  and  it  is  the  primary  factor  of  regu- 
lation that  affects  the  balance  sheet.  Regulation  is  neither  the  cause  or  the  cure  of 
many  transportation  ills.  Transportation  has  all  the  problems  common  to  the  business 
world  and  its  public  relations  besides. 


Address    of    Hon.    Clarence    F.    Lea  789 


Certain  general  principles  are  applied  under  which  rates  are  fixed.  The  primary 
principle  is  that  all  rates  must  be  reasonable — reasonable  to  the  carrier,  reasonable  to 
the  public  and  reasonable  as  between  competitors.  The  carrier  feeling  that  he  has  a 
rate  less  than  is  reasonable  has  a  right  to  seek  the  aid  of  the  commission,  if  necessary, 
to  give  him  that  reasonable  rate  to  which  he  thinks  he  is  entitled. 

In  many  cases,  a  carrier  foregoes  that  reasonable  rate  to  which  he  might  be  entitled 
and  voluntarily  proposes  a  lower  rate  in  order  to  meet  competition,  or  to  develop 
industries  on  his  line,  or  to  enable  the  traffic  to  move.  If  a  carrier  fails  to  secure  the 
profit  from  transportation  that  he  would  expect,  he  may  content  himself  with  a  meager 
profit  rather  than  lose  his  traffic.  It  may  even  be  that  in  the  zeal  of  competition,  in 
the  contest  for  traffic,  he  will  even  forego  any  profit  and  any  practical  advantage  to 
himself  in  order  to  keep  the  traffic  from  his  competitor.  In  those  cases,  a  competitor 
carrier  can  invoke  the  aid  of  the  commission  to  protect  him  against  unfair  competition. 

What  the  carrier  might  ordinarily  regard  as  a  reasonable  rate  may  be  so  high 
that  it  prohibits  the  commodity  from  reaching  its  market.  Regulation  may  permit  the 
carrier  to  reduce  his  rate  in  order  that  the  traffic  may  move. 

There  have  been  many  cases  where  the  lack  of  competition  has  led  to  unreasonably 
high  rates  and  other  cases  where  excessive  competition  has  led  to  unreasonably  low 
rates.  Fortunately,  excessive  rates  are  much  less  frequent  than  in  former  times.  The 
present  keen  competition  between  the  rail,  buses,  trucks  and  other  agencies  of  trans- 
portation have  reduced  excessive  rates  formerly  due  to  the  lack  of  competition.  Legiti- 
mate regulation,  as  I  see  it,  will  tend  to  put  rates  on  a  more  just  basis  where  practicable 
and  attempt  to  eliminate  artificial  influences  that  unjustly  impose  either  excessively 
high  or  unfairly  low  rates.  For  instance,  as  I  see  it,  just  regulation  will  not  permit  of 
excessive  rates  because  of  the  lack  of  competition  nor  should  it  tolerate  cut-throat 
rates  because  of  excessive  competition.  Reasonable  rates  of  economic  carriers  must  be 
protected  wherever  possible  if  we  are  to  have  effective  coordination. 

Another  consideration  in  rate  making  is  the  value  of  the  service  rendered  to  the 
shipper.  It  is  a  practice  practically  world-wide  to  classify  freight  and  fix  rates  with 
reference  to  the  value  of  the  service  given.  The  principle  is  of  importance  from  the 
standpoint  of  industries  affected  and  also  from  the  standpoint  of  preserving  our  trans- 
portation system.  There  may  be  two  cars  of  equal  load  in  the  same  train.  One  may 
carry  a  low  grade  freight,  the  other  a  high  class  freight.  The  car  with  the  high  class 
load  may  pay  a  tariff  twice  that  of  the  low  grade  car.  The  low  grade  freight  helped 
carry  overhead  and  the  carrier  was  better  off  on  account  of  carrying  it,  but  if  forced 
to  haul  all  freight  at  an  equal  rate,  he  could  not  operate.  The  high  grade  freight  makes 
possible  the  cheap  transportation  of  the  low  grade  freight.  It  enables  some  producers  and 
industries  to  get  into  markets  they  otherwise  could  not  reach.  It  enlarges  the  oppor- 
tunity of  different  sections  to  reach  the  central  markets;  it  tends  to  strengthen  the 
nation  economically ;  it  helps  upbuild  industries  in  communities  that  thereby  give 
greater  support  to  the  carrier;  it  tends  to  enable  the  carrier  to  continue  in  business. 
This  principle  of  freight  regulation  must  necessarily  apply  to  all  types  of  carriers. 

One  of  the  first  things  we  must  recognize  in  rate  regulation  is  that  rates  are  and 
must  necessarily  be  largely  based  upon  necessary  expediency.  There  is  no  possibility 
of  reducing  a  sane  rate  structure  to  arbitrary  provisions  and  preclude  the  consideration 
of  the  circumstances  of  each  particular  case. 

So,  under  our  system  of  regulation,  when  all  is  said  and  done,  we  must  turn  to 
the  Interstate  Commerce  Commission  and  trust  much  to  its  members  to  whom  the 
serious  responsibilities  of  regulation  must  be  confided.  Theirs  is  an  unspectacular  work, 


790  Business    Session 


the  plodding  burden  of  responsibility.  We  cannot  ask  them  to  be  supermen,  but  it 
does  not  appear  to  me  to  be  beyond  the  possible  that  our  rate  structure  may  yet  be 
greatly  improved  to  the  advantage  of  our  carriers  and  the  country. 

Some  day,  perhaps  twenty  or  thirty  years  from  now,  the  nation  will  reach  its 
final  verdict  on  regulation.  It  may  be  proclaimed  a  failure,  it  may  be  proclaimed  a 
success,  it  may  be  decided  to  be  a  necessary  method,  but  of  an  indifferent  success. 
I  trust  the  final  verdict  will  pronounce  it  a  satisfactory  method  of  preserving  our 
transportation  system  and  doing  justice  to  the  carrier  and  the  public.  To  me,  the  only 
course  available  at  the  present  time  is  to  support  and  improve  our  system  of  regulation. 

Water  Transportation 

The  original  Interstate  Commerce  Act  covered  regulation  only  of  common  carriers 
by  railroad  or  partly  by  rail  and  partly  by  water  when  under  a  common  control  with 
a  railroad.  In  the  recent  Transportation  Act,  for  the  first  time  in  the  history  of  our 
country.  Congress  placed  water  regulation  under  unified  control  with  our  other  principal 
transportation  agencies.  In  doing  this,  Congress  took  a  step  that  was  absolutely  essential 
to  coordinate  our  principal  transportation  agencies  into  a  national  transportation  system. 

Water  carriers  transport  a  substantial  amount  of  our  commerce.  They  are  important 
competitors  with  the  regulated  agencies.  There  can  be  no  just  effective  system  of  regu- 
lation where  a  substantial  part  of  the  carriers  are  unregulated  and  free  to  follow  their 
own  desires  as  to  their  methods  of  competition.  I  am  confident  that  the  water  carriers 
will,  within  a  few  years,  recognize  that  federal  regulation  is  desirable  for  their  own 
welfare  and  will  contribute  to  the  stabilization  and  betterment  of  the  industry. 

Board  of  Investigation 

The  Transportation  Act  of  1940  provides  for  the  appointment  by  the  President 
of  a  Board  of  Investigation  and  Research  to  investigate  and  report  to  Congress  as 
to  the  relative  economy  of  our  different  transportation  agencies,  with  a  view  of  deter- 
mining the  service  for  which  each  type  of  carrier  is  best  fitted.  It  is  also  the  duty  to 
investigate  the  extent  and  effect  of  public  subsidization  of  rail,  motor  and  water  carriers; 
also  the  extent  and  effect  of  taxes  imposed  upon  such  carriers.  This  board  is  authorized 
to  investigate  any  other  matters  it  deems  important  for  the  improvement  of  transporta- 
tion conditions. 

In  substance,  this  board  is  to  have  the  responsibility  of  making  a  thorough  investi- 
gation to  furnish  basic  information  which  should  be  useful  in  working  out  the  coordination 
of  our  transportation  facilities  and  moulding  these  various  agencies  in  one  consistent 
rounded-out  national  system  of  transportation.  The  creation  of  this  board  recognizes 
the  need  of  preserving  the  inherent  value  of  each  type  of  transportation  and  coordinating 
them  to  each  other  for  the  benefit  of  the  nation.  A  thorough,  impartial  and  courageous 
investigation  of  the  type  authorized  may  make  a  useful  contribution  toward  the 
ultimate  solution  of  our  confused  transportation  problems. 

The  combined  carrier  agencies  of  the  United  States  in  their  speed,  service  and 
efficiency  constitute  the  greatest  transportation  system  in  this  world.  It  is  one  of  the 
great  institutions  of  America.  In  the  course  of  its  evolution,  it  has  reached  a  stage 
where  it  needs  more  complete  and  more  practical  coordination  in  order  that  it  may 
reach  out  in  fuller  dimensions  and  serve  the  transportation  needs  of  this  country.  It 
needs  stabilization  with  a  fair  reward  based  only  on  the  economic  value  of  its  services. 
There  is  only  one  agency  that  can  accomplish  this  task  ...  the  government  of  the 
United  States. 


REPORT  OF  THE  SECRETARY 

March   1,   1941. 
To  the  Members: 

Judged  by  all  ordinary  standards,  the  American  Railway  Engineering  Association 
carried  on  its  work  in  a  thoroughly  satisfactory  manner  during  the  period  covered  by 
this  report.  The  term  "period"  is  used  advisedly  because  it  designates  the  calendar  year 
in  the  report  on  finances;  the  Association  year  (from  the  end  of  one  convention  to  the 
close  of  the  next)  in  deahng  with  committee  work,  publications,  etc.;  and  the  12  months 
from  March  1,  1940  to  March  1,  1941,  in  the  report  on  membership. 

To  sum  up — the  accounts  of  the  Association  for  the  year  ending  December  31,  1940, 
showed  an  excess  of  receipts  over  expenditures  of  $1,814.62;  there  was  a  moderate  in- 
crease in  the  net  membership;  and  an  appreciable  increase  in  the  number  of  pages  of 
printed  matter  published  in  the  bulletins,  Proceedings  and  the  Manual  supplement.  As 
has  been  demonstrated  previously,  the  prosperity  of  the  Association,  hke  that  of  the 
railroads,  varies  from  year  to  year  with  general  business  activity.  The  current  high  level 
of  railway  traffic  is  therefore  a  favorable  condition.  However,  it  is  not  an  unmixed 
blessing,  because  the  underlying  cause  of  the  "defense"  boom,  namely,  disturbed  world 
conditions,  has  had  its  adverse  effects  on  the  Association,  as  exemplified  by  complete 
loss  of  contact  with  members  in  certain  "hquidated"  countries,  resignations  and  dehn- 
quencies  of  members  in  other  foreign  countries  due  to  unfavorable  exchange  rates,  and 
a  decline  in  publication  sales. 

Finances 

As  will  be  seen  in  the  financial  statement  which  appears  on  a  following  page,  and  in 
the  summary  shown  below,  the  outcome  of  the  operations  for  the  calendar  year  of  1940, 
was  much  better  than  had  been  anticipated  in  the  budget.  An  expected  deficit  of  $2,210 
was  turned  into  a  net  gain  of  $1,814.62,  owing  to  the  fact  that  the  receipts  were  about 
$1,100  more  than  had  been  anticipated  and  because  the  projected  progress  in  the  revision 
of  the  Portfoho  of  Trackwork  Plans  was  not  realized. 

1940  1940  1939 

Budget  Estimate  Actual  Actital 

Receipts   $27,130.41  $28,265.82  $28,188.92 

Disbursements  29,340.00  26,451.20  24,269.56 


Excess  of  receipts  over  disbursements  $  1,814.62  $  3,919.36 

That  the  financial  operations  of  the  Association  follow  a  decidedly  fixed  pattern 
from  year  to  year  is  clearly  demonstrated  in  the  second  table,  which  shows  the  receipts 
and  expenditures  for  the  last  six  years,  as  adjusted  to  correct  certain  inconsistencies. 
First  of  all,  the  table  discloses  a  marked  uniformity  in  the  revenues;  it  was  only  in  1937 
that  the  figures  were  out  of  line — due  to  receipts  of  more  than  $7,000  from  the  initial 
sales  of  the  new  loose-leaf  Manual. 

This  similarity  in  figures  is  also  indicated  for  the  disbursements,  when  the  expendi- 
tures for  two  large  items  of  "special  purposes"  are  segregated  as  shown.  The  figures  for 
"Manual"  include  only  the  outlay  for  the  creation  of  the  new  loose-leaf  volume,  expendi- 
tures for  the  annual  supplements  have  been  included  in  the  so-called  "normal"  expen- 
ditures. 

791 


792 


Report   of    the   Secretary 


Incidentally,  by  extending  the  analysis  still  further,  it  would  have  been  possible  to 
demonstrate  that  the  variation  in  the  normal  expenditures  may  be  accounted  for  very 
largely  by  annual  differences  in  the  size  of  the  printing  bill,  as  influenced  by  the  amount 
by  which  the  number  of  published  pages  in  one  year  is  greater  or  smaller  than  in  another 
year. 

Comparison  of  Receipts  and  Disbursements  for  a  Six- Year  Period 

Receipts  Disbursements 

Normal  Special 

1935     $29,001  $25,311  $4,799* 

1936  28,643  25,050  9,612* 

1937  36,523  23,605  8,595* 

1938  28,422  22,780  614** 

1939  28,189  22,969  878** 

1940  28,272  24,000  2,451*** 

*  Outlay  for  new  loose-leaf  Manual,  except  cost  of  supplements. 
**  Revision  of  Trackwork  Plans. 
***  Manual  charge  $665,  Trackwork  Plans  $1,786. 

Membership 

With  this  issue  of  the  secretary's  annual  report,  a  new  factor  is  introduced  into  the 
review  of  membership  changes  during  the  year,  namely,  the  Junior  grade  of  membership, 
which  became  effective  on  June  7,  1940,  with  the  adoption  of  an  enabling  amendment 
of  the  Constitution. 

Omitting  consideration  of  Junior  members,  the  record  for  the  year  ending  March  1, 
1941,  was  as  follows: 

Members  on  rolls  as  of  March  1,  1940 1,880 

New  members    88 

Reinstatements  16 

1,984 

Lost  by  death   36 

Resigned    ^ 27 

Dropped    39  102 

Net  gain   2 

Membership  as  of  March  1,  1941   1,882 

To  this  membership  total  must  be  added  the  Junior  members  of  whom  30  were 
elected  during  the  year.  However,  as  3  of  these  were  lost  because  they  left  railway 
service,  the  net  number  of  Junior  members  is  27.  Adding  this  figure  to  1,882  gives  a 
total  Association  membership  of  1,909. 

The  motive  behind  the  creation  of  the  Junior  grade  of  membership  was  to  stimulate 
the  influx  of  young  men  into  the  Association  in  order  that  qualified  members  will  be 
available  to  carry  on  the  work  as  the  older  men  retire  or  become  less  active.  For  the 
purpose  of  developing  the  outlook  of  the  Association  as  influenced  by  the  "expectancy" 
of  its  membership  roll,  the  accompanying  graph  was  prepared  in  which  the  members  are 
grouped  by  the  year  of  affiliation.  As  is  to  be  expected,  the  chart  discloses  a  marked 
correlation  between  growth  of  membership  in  any  one  year  and  general  economic  con- 
ditions. It  shows  also,  that  only  448,  or  23  percent  of  the  present  members  joined  prior 
to  1919,  and  that  of  these,  151  or  one-third  represent  substantially  the  Association's 
entire  Life  membership. 

While  the  chart  affords  assurance  of  no  marked  change  in  membership  status  during 
the  next  three  years,  the  fact  that  265  or  nearly  14  percent  of  the  present  members  joined 


Report   of    the   Secretary 


793 


'00 


'05  '10  '15  '20 

Distribution  of  AREA  Membership  by  Years 
in  Which  Members  Joined 


in  the  three  years,  1919  to  1921,  inclusive,  points  to  a  marked  increase  in  transfers  to 
Life  membership  beginning  with  1944. 

The  loss  of  36  members  by  death  during  the  last  12  months  was  6  less  than  the 
preceding  year,  but  was  noteworthy  because  those  36  members  included  the  president, 
George  S.  Fanning,  who  died  on  January  2,  1941,  and  four  past-presidents,  W.  B.  Storey, 
L.  A.  Downs,  J.  V.  Neubert  and  J.  C.  Irwin,  the  latter  having  been  a  member  of  the 
Board  of  Direction  at  the  time  of  his  death  on  March  20,  1940.  The  Association  also 
lost  a  third  member  of  the  Board  through  the  death  on  September  8,  1940,  of  Robert 
Faries,  director,  and  the  chairman  of  the  Committee  on  Wood  Preservation  with  the 
death  of  C.  F.  Ford  on  June  9,  1940. 

Publications 

General — There  was  a  definite  increase  in  the  volume  of  printed  matter  pubUshed 
by  the  Association  in  the  year  ending  with  the  1941  convention.  This  appUes  alike  to  the 
number  of  pages  in  the  bulletins,  the  Proceedings  and  the  Manual  supplement. 

Bulletins — The  number  of  pages  in  the  seven  bulletins  ending  with  the  issue  of 
March,  1941,  was  1,282  compared  with  987  for  the  preceding  seven.  However,  for  a  true 
comparison,  it  is  necessary  to  deduct  78  pages  from  the  total  because  the  1,282  pages 
embrace  both  the  sixth  and  seventh  progress  reports  on  the  Investigation  of  Fissures  in 
Railroad  Rails,  owing  to  the  fact  that  the  seventh  progress  report  (78  pages)  was  pub- 
lished prior  to  the  convention  (February  bulletin)  whereas  all  of  the  previous  reports 
of  this  kind  have  been  withheld  from  pubUcation  until  after  the  convention. 

Ample  material  has  been  available  for  publication  in  the  so-called  summer  bulletins 
as  indicated  by  the  following  list: 

Bulletin  418,  June-July,  1940 

Sixth  Progress  Report  of  the  Joint  Investigation  of  Fissures  in  Railroad  Rails 
Second  Progress  Report — Joint  Investigation  of  Continuous  Welded  Rail 


794  Report    of    the    Secrctar>- 

Annual  Report  on  Stresses  in  Railroad  Track 

Seventh  Progress  Report — Committee  on  Stresses  in  Railroad  Track 
Prehminary  Report  of  Committee  5 — ^Track  (Installment  of  9  trackwork  plans) 
Tie  Renewal  Statistics  for  1939 

Bulletin  419,  September-October,  1940 

Reports  of  the  Committees  of  the  Electrical  Section,  Engineering  Division,  AAR 

Mechanization  in  the  Maintenance  of  Way  Department  (Special  report  prepared  by 
Committee  22 — Economics  of  Railway  Labor) 

Report  of  the  Joint  Committee  on  Standard  Specifications  for  Concrete  and  Re- 
inforced Concrete 

Preliminary  Report  of  Committee  5 — ^Track  (Installment  of  26  trackwork  plans) 

Proceedings — The  Proceedings  for  1940  were  larger  than  in  several  previous  years 
owing  to  the  publication  of  several  monographs  in  accordance  with  a  decision  of  the 
Board  of  Direction  to  resume  the  reprinting  in  the  Proceedings  of  all  or  nearly  all  of  the 
monographs  published  in  the  summer  bulletins,  as  a  means  of  insuring  a  more  perma- 
nent record  of  valuable  material.  Among  the  monographs  so  reprinted  was  that  by 
E.  E.  R.  Tratman  on  Car  Ferries,  which  was  republished  after  considerable  editing  and 
amplification  by  the  author  of  the  original  paper  that  appeared  in  Bulletin  387  for 
July,  1936. 

Manual — Progress  in  the  revision  of  the  Manual  is  shown  in  the  table  of  annual 
supplements.  The  1940  revision  was  the  most  extensive  to  be  issued  since  the  appearance 
of  the  loose-leaf  Manual. 

New  Sheets       Old  Sheets  Net 

Supplement  Issued  Withdraivn       Increase 

1937    110  69  41 

1938    151  121  30 

1939    128  95  33 

1940    185  139  46 

Total  574  424  150 

It  is  to  be  expected,  of  course,  that  the  supplements  in  the  even-numbered  years  will 
be  larger  than  in  the  odd-numbered  years  owing  to  the  policy  of  revising  and  reissuing 
the  alphabetical  index  of  some  24  sheets  (48  pages)  only  in  alternate  years. 

With  the  approval  of  the  Board  of  Direction,  arrangements  have  been  made  to  facil- 
itate the  sale  of  the  Manual  in  chapters  and  parts  of  chapters,  as  indicated  by  the  scale 
of  prices  appearing  on  page  491  of  Bulletin  422.  This  was  done  to  meet  a  growing  demand 
for  the  smaller  units  of  Manual  material. 

During  the  last  year  176  copies  of  the  complete  Manual  were  sold,  bringing  the  total 
distribution  to  1,914  copies.  Adding  to  this  number  of  complete  Manuals,  the  number  of 
copies  that  have  been  broken  up  for  the  sale  of  chapters  and  parts  thereof,  brings  the 
Association  to  a  realization  that  it  has  reached  another  stage  in  the  history  of  the  loose- 
leaf  Manual,  namely,  to  the  inception  of  the  first  reprinting. 

This  will  not  be  as  formidable  a  task  as  it  might  appear  at  first  thought,  for  instead 
of  being  done  all  at  once,  it  will  be  started  with  the  chapters  for  which  there  has  been 
the  largest  demand.  This  is  a  rather  fortunate  situation  since  it  permits  the  reprinting 
to  be  carried  out  in  an  orderly  manner  over  a  period  of  about  two  years. 

Track  Plans— While  progress  in  the  revision  of  the  portfolio  of  track  plans  did  not 
equal  the  rather  ambitious  program  that  the  Committee  on  Track  had  set  up,  50  new 


Report   of   the   Secretary 79S 

plans  were  completed  during  the  year,  of  which  9  appeared  in  Bulletin  418,  26  in  Bulletin 
419,  and  15  in  Bulletin  423.  These,  added  to  the  24  approved  last  year  and  13  others 
requiring  only  minor  alterations,  will  provide  a  total  of  87  revised  plans  that  will  be 
ready  for  distribution  shortly  after  the  convention  and  will  leave  about  50  more  plans  to 
be  completed  for  submission  at  the  convention  next  year. 

Miscellaneous — Only  one  change  of  any  consequence  was  made  during  the  year  in 
the  make  up  of  the  publications,  namely,  the  revision  of  the  introductory  statement  of 
the  committee  reports  for  the  purpose  of  introducing  page-number  references  to  the 
reports  on  each  assignment.  While  this  is  certain  to  facilitate  the  study  and  presentation 
of  the  reports,  it  is  believed  that  the  experience  with  the  initial  trial  of  this  plan  will 
point  the  way  to  the  refinement  of  certain  details  that  will  effect  further  improvements. 

Work  of  the  Committees 

The  total  personnel  of  the  Association's  27  standing  and  special  committees  includes 
858  names.  However,  because  four  committees  consist  of  representatives  of  other  com- 
mittees and  because  a  considerable  number  of  members  are  identified  with  more  than 
one  committee,  the  net  number  of  members  on  committees  is  660.  While  this  figure  affords 
an  index  of  the  widespread  participation  in  committee  work,  a  more  convincing  picture 
is  afforded  when  the  analysis  is  confined  to  those  who  actually  prepared  the  reports, 
namely,  the  chairmen  of  the  subcommittees  that  submitted  reports  this  year  on  subjects 
assigned  to  them.  A  check  of  the  reports  appearing  in  Bulletins  420  to  423,  inclusive, 
shows  that  89  individual  subcommittee  chairmen  were  responsible  for  one  report  each, 
8  others  wrote  two  reports  each  and  3  more  prepared  three  reports  each,  or  a  total  of 
114  reports  prepared  by  exactly  100  men. 

From  the  standpoint  of  subject  matter  and  content  the  record  is  equally  interesting. 
The  1940  outUne  of  work  for  the  27  committees  hsted  a  total  of  201  subject  assignments. 
The  reports  prepared  by  26  committees  embrace  individual  subcommittee  reports  on 
128  subjects,  and  while  it  is  not  possible  to  set  up  any  rigid  classification  of  the  material 
in  these  reports,  the  following  analysis  affords  a  fair  idea  of  the  nature  of  the  contents: 

Revisions  of  the  Manual — minor  13 

Revisions  of  the  Manual — major   8 

New  Manual  material — minor   S 

New  Manual  material — major   7 

New  Manual  material — tentative  8 

Information   50 

Reports  on  research  projects 9 

Statistical  material S 

Mathematical  studies S 

Bibliographies   3 

Brief  reports  of  progress  IS 

Total   128 

Research  Work 

Work  on  a  considerable  number  of  committee  assignments  has  been  possible  only 
because  of  the  availability  of  data  obtained  in  the  course  of  research  work,  most  of  which 
has  been  carried  on  with  funds  provided  by  the  Association  of  American  Railroads. 
Appropriations  for  investigations  in  which  AREA  committees  have  a  particular  interest 
are  shown  below  for  both  1940  and  1941.  The  items  in  this  list  are  exclusive  of  the 
annual  appropriations  for  the  work  of  the  research  engineer,  and  do  not  include  the 


796  R  e  p  o  rt    of    the    Secretary 


special  fund  allocated  jointly  to  the  Engineering  and  Mechanical  divisions  for  an  investi- 
gation of  the  effect  of  locomotive  counterbalancing  on  track  and  equipment. 

Project                                                                                       1940  1941 

Rail  Investigations  (statistical)    $  5,400        $  5,400 

Transverse  Fissure  Investigation  22,500  9,000* 

Stresses  in  Railroad  Track  23,000  18,000** 

Tests  of  Joint  Bars 3,500  3,500 

Tests  of  Manganese  Frogs 1,000  1,000 

Tests  of  Bolt  Tension 600  

Impact  Studies 4,000  11,500 

Fatigue  Tests  of  Structural  Welds 5,000 

Tests  of  asphalt  and  coal  tar  pitch 500 

•  AAR  contribution  is  matched  each  year  by  a  like  amount  of  money  contributed  by  the  rail 
manufacturers.  . 

•*  Part  of  the  expense  of  the  stresses  in  track  staff  in  1941  will  be  charged  to  the  special  appro- 
priation for  the  locomotive  counterbalance  investigation. 

The  most  important  development  during  1940  in  the  field  of  railway  engineering 
research  was  the  appointment  by  Vice-President  Buford,  of  the  Operations  and  Mainte- 
nance Department,  of  a  Committee  on  Relation  Between  Track  and  Equipment  to 
replace  an  earlier  committee  known  as  the  Joint  Committee  on  Relation  Between  Track 
and  Rolling  Stock.  The  personnel  of  the  new  committee  as  appointed  on  May  21,  1940 
was  as  follows: 

Representing  the  Engineering  Division 

Robert    Faries    (Chairman),    Assistant    Chief    Engineer-Maintenance,    Pennsylvania 

Railroad,  Philadelphia,  Pa. 
W.  J.  Burton,  Assistant  to  Chief  Engineer,  Missouri  Pacific  Railroad,  St.  Louis,  Mo. 
G.  M.  Magee,  Research  Engineer,  Engineering  Division,  AAR,  Chicago. 
W.  S.  Lacher,  Secretary,  Engineering  Division,  AAR,  Chicago. 

Representing  the  Mechanical  Division 

Kenneth   Cartwright,   Mechanical   Engineer,    New   York,   New   Haven   &   Hartford 

Railroad,  New  Haven,  Conn. 
A.  G.  Hoppe,  Assistant  Mechanical  Engineer,  Chicago,  Milwaukee,  St.  Paul  &  Pacific 

Railroad,  Milwaukee,  Wis. 
W.  I.  Cantley,  Mechanical  Engineer,  Mechanical  Division,  AAR,  Chicago. 
V.  R.  Hawthorne,  Executive  Vice-Chairman,  Mechanical  Division,  AAR,  Chicago. 

Mr.  Faries  was  appointed  chairman  of  the  committee,  and  following  his  death  on 
September  8,  1940,  Mr.  Cartwright  succeeded  him  as  chairman,  and  Mr.  E.  M.  Hastings, 
chief  engineer,  Richmond,  Fredericksburg  &  Potomac  Railroad,  Richmond,  Va.,  was 
appointed  to  replace  him  as  representative  of  the  Engineering  division. 

This  committee  has  developed  a  comprehensive  program  of  investigations  in  which 
the  study  of  locomotive  counterbalancing  will  occupy  the  most  important  place  for  the 
present,  and  the  sum  of  $115,200  has  been  appropriated  for  instruments  and  work  to  be 
done  during  1941. 

W.  S.  Lacher, 

Secretary. 


Report    of    the    Secretary 


797 


GEOGRAPHICAL  DISTRIBUTION  OF  MEMBERSHIP 

United  States  and  Possessions 


Alabama    14 

Arizona    2 

Arkansas    10 

California    57 

Canal  Zone  1 

Colorado    20 

Connecticut     26 

Delaware  2 

District  of  Columbia   33 

Florida 11 

Georgia    25 

Hawaii   1 

Idaho   1 

Illinois    321 

Indiana    37 

Iowa 18 

Kansas   29 

Kentucky     33 

Louisiana     13 

Maine     6 

Maryland    31 

Massachusetts     42 

Michigan   48 

Minnesota   59 

Mississippi     9 

Missouri     94 

Montana    5 


Nebraska   

Nevada    , 

New   Hampshire 
New  Jersey  . . . . , 
New  Mexico  . . . , 
New   York    .... 
North  Carolina 

Ohio   

Oklahoma 

Oregon   

Pennsylvania    . . 
Puerto  Rico   . . . , 
Rhode  Island   . . 
South   Carolina 
South   Dakota    . 

Tennessee    

Texas    

Utah     

Vermont    

Virginia    

Washington     . . . 
West  Virginia   . . 

Wisconsin    

Wyoming     


25 

2 

5 

30 

1 

141 

14 

142 

7 

8 

157 

1 

3 

2 

3 

25 

73 

7 

7 

91 

19 

23 

14 

2 

1748 


Other  Countries 


Canada    93 

Mexico   9 

Australia    8 

Brazil   8 

England   5 

Argentine     6 


Central  America 

China   

Japan   

Cuba    

India    

Manchukuo 


Un.  Soc.  Sov.  Rep.  . . 

Czechoslovakia     

Bolivia   

Colombia     

France    

Germany    

Poland    

Switzerland   

Tanganyika   Territory 
Uganda    


161 


798  Report   o  f    the    Secretary 


Beceasfeb  Mtmbevi 

F.  D.  Bardwell 

Retired  Assistant  Engineer,  New  York  Central  Railroad,  New  York  City 

H.  A.  Bertram 

Division  Engineer,   Chesapeake  &  Ohio  Railway,  Peru,   Ind. 

Lincoln  Bush 

Retired  Consulting  Engineer,  East  Orange,  N.  J. 

J.  F.  Donovan 

Division  Engineer,  Lehigh  Valley  Railroad,  Wilkes  Barre,  Pa. 

L.  A.  Downs 

Chairman  of  the  Board,  Illinois  Central  System,  Chicago 

B.  T.  Elmore 

Bureau  of  Statistics,  Interstate  Commerce  Commission,  Washington,  D.  C. 

R.  C.  Falconer 
Assistant  Vice-President,  Erie  Railroad,  Cleveland,  Ohio 

Geo.  S.  Fanning 
Chief  Engineer,  Erie  Railroad,   Cleveland,  Ohio 

Robert  Faries 

Assistant  Chief  Engineer  Maintenance,  Pennsylvania  Railroad,  Philadelphia,  Pa. 

C.  F.  Ford 

Supervisor  Tie  and  Timber  Department,  Chicago,  Rock  Island  &  Pacific  Railway,  Chicago. 

C.  W.  Galloway 

Vice-President  Operation  and  Maintenance,  Baltimore  &  Ohio  Railroad; 
President,  Monongahela  Railroad,  Baltimore,   Md. 

Geo.  Gibbs 

Consulting  Engineer,  Gibbs  &  Hill,  Inc.,  New  York   City 

H.  C.  Griswold 
President,  John  P.  Morton  &  Company,  Louisville,  Ky. 

W.  W.  Gwathmey 

Consulting  Engineer,  Norfolk,  Va. 

C.  S.  GzowSKi 

Chief  Engineer,  Construction  Department,  Canadian  National  Railways,  Montreal,  Que. 

C.  S.  Heritage 

Bridge  Engineer,  Kansas  City  Southern  Railway,  Kansas  City,  Mo. 

E.  M.  M.  Hill 
Chief  Engineer,  Western  Region,  Canadian  National  Railways,  Winnipeg,  Man. 


Report    of    the    Secretary  799 


H.    I.   HOAG 
Division  Engineer,  New  York  Central  Railroad,  Buffalo,  N.  Y. 

J.  C.  Irwin 
Valuation  Engineer  (Retired),  Boston  &  Albany  Railroad  (N.Y.C.R.R.),  Boston,  Mass. 

D.  J.  Kerr 
President  (Retired),  Lehigh  Valley  Railroad,  Spokane,  Wash. 

G.  H.  Kimball 

Consulting  Engineer,  Pontiac,  Mich. 

G.  E.  Ladd 
Consulting  Engineer  Geologist,  Chevy  Chase,  Md. 

H.  B.  Lincoln 

Division  Engineer,  New  York  Central  Railroad,  Cleveland,  Ohio 

Ralph  Modjeski 

Consulting  Engineer,  New  York  City. 

Gilbert  Murray 

Division  Engineer,  Canadian  National  Railways,  Prince  Albert,  Sask. 

John  V.  Neubert 

Chief  Engineer  Maintenance  of  Way,  New  York  Central  Railroad,  New  York  City. 

E.  H.  Pfaitlin 

Assistant  Division  Engineer  (Retired),  Chicago,  Milwaukee,  St.  Paul  &  Pacific  Railroad,  Chicago. 

J.  H.  Prior 

Chief  Architectural  Engineer,  Chicago  Board  of  Education,  Chicago. 

L.  J.  Reiser 

Assistant  Supervisor,  Tie  and  Timber  Department,  Chicago,  Rock  Island  &  Pacific 
Railway,  Kansas  City,  Mo. 

O.  M.  Rognan 
Architect,  Northern  Pacific  Railway,  St.  Paul,  Minn. 

A.  B.  Scowden 

General  Bridge  Inspector,  Baltimore  &  Ohio  Railroad,  Cincinnati,  Ohio. 

H.  B.  Seaman 
Retired  Consulting  Engineer,  Brooklyn,  N.  Y. 

V.  I.  Smart 
Deputy  Minister,  Department  of  Transport,  Ottawa,  Ont. 

W.  B.  Storey 
Retired  President,  Atchison,  Topeka  &  Santa  Fe  Railway,  Chicago 

R.  H.  Washburn 
Assbtant  Divbion  Engineer,  Alton  Railroad,   Bloomington,  111. 

J.  W.  Williams 
Chief  Engineer,  Western  Pacific  Railroad,  San  Francisco,  Calif. 


800  Report    of    the    Secretary 

FINANCIAL  STATEMENT  FOR  CALENDAR  YEAR  ENDING 
DECEMBER  31,  1940 

Balance  on  hand  January  1,  1940 $85,323.26 

RECEIPTS 
Membership  Account 

Entrance  Fees $     920.00 

Dues  17,550.06 

Binding  Proceedings   1,467.85 

Sales  of  Publications 

Proceedings   962.26 

Bulletins   902.66 

Manuals    1,908.17 

Specifications 703 .97 

Track  Plans    503.75 

Advertising 

Publications  796.68 

Interest  Account 

Investments  2,078.26 

Miscellaneous   41.75 

Joint  Bar  Investigation  430.41 

Total   $28,265.82 

DISBURSEMENTS 

Salaries   $  8,300.00 

Proceedings  4,293.11 

Bulletins   4,009.69 

Stationery  and  Printing  851.61 

Rents,  Light,  etc 780.00 

Supplies   80.49 

Expressage   13.21 

Postage  562.91 

Exchange    97.46 

Office   Equipment    168.77 

Annual  Convention  669.01 

Refunds,  dues,  etc 37.00 

Audit  (year  1939)   200.00 

Pensions  (E.  H.  Fritch,  A.  K.  Shurtleff ) 2,460.00 

Social  Security  Act  78.00 

Manual  Supplements 1,837.49 

Track  Plans 1,785.93 

Miscellaneous    137.96 

Committee  and  Officer's  Expense 88.56 

Total  $26,451.20 

Excess  of  Receipts  over  Disbursements $  1,814.62 

Balance  on  hand  December  31,  1940  $87,137.88 


Report    of    the    Treasurer 801 


REPORT  OF  THE  TREASURER 

To  the  Members: 

Balance  on  hand  January  1,  1940  $85,323.26 

Receipts  during  1940   $28,265.82 

Paid  out  on  Audited  Vouchers 26,451.20 

Excess  of  Receipts  over  Disbursements  1,814.62 

Balance  on  hand  December  31,  1940  $87,137.88 

Consisting  of 

♦Bonds  at  cost  $75,945.81 

Cash  in  Northern  Trust  Company  Bank 10,331.23 

Gash  in  Royal  Bank  of  Canada  835.84 

Petty  Cash   25.00 

$87,137.88 

•Includes  $6,240.00  book  value  of  Rock  Island,  Arkansas  &  Louisiana  4yi%   bonds  due  March   1, 
1934,  not  paid,  in  default. 

Also  includes  St.L.S.W.    5%    bonds,   book   value   $1,319.31,    interest   coupons  January    1,    1936    and 
thereafter  in  default. 

Respectfully  submitted, 

W.  H.  Penfield,  Treasurer. 


We  have  made  an  audit  of  the  accounts  of  the  American  Railway  Engineering 
Association  for  the  year  ending  December  31,  1940,  and  find  them  to  be  in  accordance 
with  the  foregoing  statements. 

C.  G.  Rivers, 
E.  Deming, 

Auditors. 


GENERAL  BALANCE  SHEET 

December  31,  1940 

Assets                                                                                                            1940  1939 

Due  from  Members    $     900.00  $      765.00 

Due  from  Sales  of  Publications   33.80  25.95 

Due  from  Advertising    51 .00  56.00 

Furniture  and  Fixtures 537.77  410.00 

Publications  on  Hand  (estimated)    1 ,500.00  2,000.00 

♦Investments  (cost)    75,945.81  75,945.81 

Interest  on  Investments  (accrued)   609.80  607.29 

Cash  in  Northern  Trust  Company  Bank  10,331.23  9,116.79 

Cash  in  Royal  Bank  of  Canada   835.84  235.66 

Petty  Cash    25.00  25.00 

Manuals  (on  hand)    1,800.00  2,800.00 

Trackwork  Plans  800.00  

Joint  Bar  Investigation  (Due  from  AAR)    ....  430.41 

Total  $93,370.25  $92,417.91 

Liabilities 

Members'  Dues  Paid  in  Advance  $  5,300.50  $  5,153.75 

Surplus    88,069.75  87,264.16 

Total  $93,370.25  $92,417.91 

•  Includes  $6,240.00  book  value  of  Rock  Island,  Arkansas  &  Louisiana  4}4%  bonds  due  March  1, 
1934,  not  paid,  in  default. 

Also  includes  St.L.S.W.  S%  bonds,  book  value  $1,319.31,  interest  coupons  January  1,  1936  and 
thereafter  in  default. 


802 Standardization  —  Signals    and    Interlocking 

Discussion  on  Standardization 

(For  Report,   see  pp.   25-27.) 

Vice-President  Bond:  Owing  to  the  enforced  absence  of  Mr.  Nicholson,  chairman 
of  the  committee,  the  report  will  be  presented  by  Mr.  Wilson  who  represents  us  through 
the  Association  of  American  Railroads  as  a  member  of  the  Standards  Council  of  the 
American  Standards  Association.  We  are  much  obliged  to  Mr.  Wilson  for  substituting 
in   Mr.    Nicholson's   absence. 

A.  R.  Wilson  (Pennsylvania):  At  the  1940  convention  this  committee  submitted  a 
tabulation  of  recommended  practices  and  urged  their  adoption,  insofar  as  the  railroads 
could  do  so.  The  recommended  practices  which  are  adopted  annually  and  .appear  in 
the  Manual  are  reviewed  by  this  committee  and,  if  found  desirable,  are  sponsored 
for  national  standardization  through  the  American  Standards  Association.  The  committee 
has  no  recommendation  at  this  time  looking  towards  the  sponsoring  of  new  standards. 
One  of  the  duties  of  this  committee  is  to  maintain  contact  with  other  standardiza- 
tion bodies.  The  interests  of  your  Association  are  carefully  guarded  by  the  appointment 
to  these  other  bodies  of  representatives  from  your  respective  committees.  Last  year  a 
complete  list  was  given  you  as  to  your  representation  in  these  other  associations.  This 
year  only  changes  in  that  list  are  noted. 

The  representation  on  the  American  Society  for  Testing  Materials  is  on  the  second 
page  of  the  report.  I  wish  to  call  your  attention  particularly  to  the  activities  of  two 
committees  of  that  society,  namely  Al  on  Steel  and  CI  on  Cement.  The  activities  of 
both  of  these  committees,  on  which  you  are  ably  represented,  are  of  vital  interest  to 
this  Association. 

This  report  is  presented  to  you  as  information. 

Vice-President  Bond:  Thank  you,  Mr.  Wilson.  We  all  appreciate  the  scope  of 
the  activities  of  the  Committee  on  Standardization  and  the  difficulties  with  which  they 
have  to  struggle  at  times.  The  committee  is  excused  with  the  thanks  of  the  convention. 

Discussion  on  Signals  and  Interlocking 

(For  Report,  see  pp.  31-36.) 

(Vice-President  Bond  in  the  chair) 

Chairman  H.  G.  Morgan  (Illinois  Central):  The  report  of  Committee  10  covers 
two  assignments.  The  first  assignment  is:  Developments  in  railway  signaling.  As  there 
have  been  no  developments,  there  is  no  report.  The  second  assignment  is:  The  principal 
current  activities  of  the  Signal  Section,  AAR,  of  which  there  have  been  quite  a  number. 
Mr.  Post,  chairman  of  the  subcommittee,  will  tell  you  all  about  them. 

W.  M.  Post  (Pennsylvania):  Mr.  Morgan  has  told  you  that  we  had  no  report  on 
the  developments  in  railway  signaling.  There  have  been  some  developments  which 
make  it  possible  to  remotely  control  signals  and  switches  over  existing  telephone  wires, 
and  it  is  hoped  that  a  report  covering  them  can  be  presented  next  year. 

Our  second  assignment  is:  The  principal  current  activities  of  the  Signal  Section,  and 
your  attention  is  again  called  to  the  series  of  pamphlets  on  American  Railway  Signaling 
Principles  and  Practices,  prepared  for  the  education  of  signalmen  and  others  desiring 
to  study  this  subject.  Members  may  be  asked  by  young  men  entering  railway  service 
where  books  describing  railway  signaling  can  be  obtained.  A  letter  to  the  secretary 
of  this  Association  or  to  Mr.  R.  H.  C.  Balliet,  secretary  of  the  Signal  Section,  30  Vesey 
street,  New  York,  will  produce  information  on  how  these  pamphlets  can  be  obtained. 


Discussion 803 

I  would  also  like  to  call  attention  to  some  of  the  subjects  reported  on  and  which 
can  be  found  in  the  Signal  Section  Proceedings  for  1040. 

Referring  to  No.  1 — Costs  involved  in  stopping  trains,  the  Committee  on  Economics 
of  Railway  Signaling  presented  in  its  report  curves  and  formulas  to  obtain  the  cost 
of  fuel  and  water  wasted  in  stopping  a  4,400-ton  (gross  weight)  train  of  4S-ton  double- 
truck  cars  hauled  by  a  2-S-4  locomotive  on  grades  up  to  0.6  percent  ascending  and 
0.6  percent  descending  in  steps  of  0.1  percent  for  speeds  up  to  60  m.p.h.  Examples 
worked  out  for  this  train,  stopping  from  35  m.p.h.,  indicate  that  the  cost  of  coal  and 
water  wasted  on  a  0.1  percent  ascending  grade  was  $1.13  and  on  a  0.1  percent  descending 
grade  was   $1.27. 

Subject  2  covers  costs  (other  than  fuel  and  water)  involved  in  stopping  trains. 
In  this  report  is  discussed  wear  on  rail  and  track ;  wear  on  wheels ;  wear  and  tear 
on  rolling  stock;  locomotive  maintenance  and  lubrication;  wear  on  brake  shoes; 
damage  to  lading;  commercial  value  of  delay  in  delivery;  freight  train  delay  hours, 
and  the  cost  of  regaining  lost  time.  Most  of  these  are  intangible  savings.  However, 
they  are  discussed  in  this  report,  and  the  report  is  well  worth  reading. 

No.  4 — Economy  in  signaling  construction  and  maintenance  costs  by  using  78-ft. 
rails  instead  of  39-ft.  rails:  The  saving  in  costs  of  bonding  rails  is  reported  as  $37.20 
per  mile,  and  the  annual  saving  in  maintenance  would  be  $1.11  per  mile. 

No.  5 — Economy  of  slide  detector  fences:  This  report  contains  the  costs  and  annual 
savings  obtained  from  several  installations  of  such  fences. 

No.  7 — Economic  value  of  car  retarders:  The  committee  has  prepared  a  form  to 
be  used  in  assembling  the  costs  and  annual  savings.  This  form  will  be  sent  to  railroads 
having  car  retarder  installations  with  a  view  to  presenting  these  data  at  some  future 
meetings.  So  if  you  receive  a  copy  of  this  form,  the  Signal  Section  will  appreciate 
it  very  much  if  you  will  take  the  necessary  time  to  supply  the  data  as  requested  on 
that  form.  We  believe  some  valuable  lessons  can  be  learned  which  will  be  presented 
at  some  future  meeting. 

No.  10 — Protection  of  traffic  against  slides  and  rock  falls:  This  report  contains 
descriptions  and  drawings  showing  several  types  of  slide  detector  fences. 

No.  17 — This  is  a  report  on  devices  and  methods  to  control  automatic  signals 
or  special  signals  for  the  protection  of  traffic  against  high  water  at  vulnerable  points 
and  fires  at  bridges  and  trestles.  If  you  have  any  such  problems,  this  report,  I  think, 
will  be  helpful. 

No.  24 — Illumination  of  crossings:  This  report  describes  how  flood  lights  should 
be  arranged  at  highway  crossings.  It  calls  attention  to  the  fact  that  flood-lighting  does 
not  take  the  place  of  crossing  signals  and  should  not  be  used  as  a  warning  of  the 
approach  of  trains. 

The  rest  of  the  report  contains  l.sts  of  specifications,  requisites,  drawings  and  other 
matter  which  have  been  submitted  to  letter  ballot. 
Chairman  Morgan:  This  concludes  the  report. 

Vice-President  Bond:  You  have  heard  the  report  as  presented.  Any  discussion? 
L.  J.   Hughes    (Chicago,   Rock   Island  &   Pacific):   I   should   like   to  inquire  of   the 
committee  where  you  get  these  reports,  how  do  you  obtain  them  and  what  they  cost. 
Chairman    Morgan:  They    can    be    obtained    through    the    secretary    of    the    Signal 
Section.  The  prices  vary. 

Vice-President  Bond:  If  there  is  no  further  discussion,  Mr.  Morgan,  your  com- 
mittee is  excused  with  the  appreciation  of  the  Association  for  a  very  informative  report. 


804  Economics    of    Railway    Location    and    Operation 

Discussion  on  Economics  o£  Railway  Location  and  Operation 

(For  Report,  see  pp.  44-86.) 

(Vice-President  Clarke  presiding) 

Chairman  H.  M.  Stout  (Northern  Pacific) :  The  agenda  of  this  committee  the  past 
year  has  included  14  assigned  subjects.  Four  of  these  required  collaboration  with  other 
committees  of  this  Association  or  other  divisions  of  the  Association  of  American  Rail- 
roads. In  addition,  collaboration  was  required  of  us  in  the  study  of  three  subjects 
included  in  the  assignments  of  other  standing  committees  of  this  Association.  All  these 
assignments  have  been  accepted,  and  due  consideration  has  been  given  them  during 
the  year. 

The  report  of  the  committee  includes  progress  reports  submitted  as  information 
on  six  of  the  assigned  subjects.  Reports  were  prepared  on  two  additional  assignments 
but  publication  has  been  withheld. 

First,  Revision  of  Manual:  In  our  constant  scrutiny  of  the  sections  of  the  Manual 
relating  to  economics  of  railway  location  and  economics  of  railway  operation,  for 
inaccuracies  and  opportunities  for  better  statements  of  principles,  the  article  denoted 
The  Cost  of  Stopping  and  Starting  Trains  (see  Chapter  21,  pages  2-S  of  the  Manual) 
has  been  undertaken.  Last  year  some  preliminary  notes  on  the  cost  and  effect  of 
stopping  trains  were  prepared  and  submitted  for  discussion  and  further  study  and 
collaboration  with  the  Signal  Section  of  the  Association  of  American  Railroads  which 
has  an  interest  in  the  subject.  The  studies  and  discussions  with  the  Signal  Section 
which  have  ensued  have  brought  out  the  fact  that  the  results  based  on  last  year's 
preliminary  notes  do  not  agree  with  those  published  by  the  Signal  Section.  For  example, 
it  was  found  that  our  proposed  method  indicated  that  the  fuel  and  water  wasted  on 
account  of  a  stop  increased  as  the  weight  of  the  train  increased,  whereas  the  Signal 
Section's  method  indicated  that  the  fuel  and  water  wasted  decreased  as  the  weight  of 
the  train  increased.  Failure  of  the  two  methods  to  agree  in  this  important  particular 
casts  doubt  upon  both  methods.  Hence,  a  number  of  attempts  have  been  made  to 
reconcile  the  two  methods  before  proceeding  with  the  preparation  of  a  report  for 
presentation  to  and  consideration  of  the  Association. 

The  AREA  method  assumes  typical  locomotives  and  bases  the  speed,  tractive 
effort  and  horsepower  curves  on  the  normal  capacity,  in  order  to  simplify  the  calcula- 
tion, because  the  fuel  and  water  consumptions  on  this  basis  are  constant.  In  other 
words,  it  is  an  easy  matter  to  determine  the  work  done  if  it  is  expressed  in  terms  of 
horsepower-hours  measured  by  the  boiler  output  which  is  constant  for  all  speeds  above 
Vi  and  proportional  to  the  fuel  and  water  consumptions.  Also,  on  this  basis  the  same 
boiler  output  for  a  given  locomotive  can  be  taken  for  all  weights  of  trains.  Furthermore, 
the  relation  between  the  boiler  output  and  the  driver  output  varies  with  trains  of  different 
weights.  Consequently,  the  driver  horsepower-hours  on  the  basis  of  normal  capacity  are 
not  a  true  measure  of  the  boiler  output  or  of  the  fuel  and  water  consumptions. 

It  is  expected  a  report  on  this  subject  will  be  developed  and  made  available  next 
year. 

Subject  No.  2,  Methods  for  obtaining  a  more  intensive  use  of  existing  railway 
facilities:  This  assignment  is  a  most  practical  topic.  The  painful  memories  of  the 
operating  conditions  at  ports  and  other  railway  terminals  during  the  previous  World 
War  period  suggested  the  study  of  the  intensification  of  use  of  railway  facilities  resulting 
from  the  operation  of  the  port  control  organization  set  up,  in  the  autumn  of  1939, 
by  the  Association  of  American  Railroads,  as  an  addition  to  the  list  of  projects  here- 


Discussion 805 

tofore   reported.  As   Mr.   L.   E.   Dale,   chairman   of   the   subcommittee,   is   unable   to   be 
present  today,  the  report  will  be  presented  by  Mr.  H.  F.  Schryver. 

(H.  F.  Schryver,  New  York  Central,  read  the  report  on  Assignment  2.) 
Mr.  Schryver:  I  might  add  that  recently  Mr.  Budd,  transportation  commissioner, 
stated  that  the  amount  of  export  traffic  handled  through  the  North  Atlantic  ports  has 
reached  the  equivalent  of  the  peak  movement  of  1918.  That  was  as  of  about  the  middle 
of  February.  It  is  possible  that  by  this  date  that  amount  of  traffic  has  been  exceeded. 
Chairman  Stout:  Subject  No.  3,  Methods  or  formulas  for  the  solution  of  special 
problems  relating  to  more  economical  and  efficient  railway  operation:  The  report  here 
offered,  under  this  assignment,  is  a  supplement  to  the  reports  to  the  last  two  conven- 
tions of  the  Association.  The  specific  topic  is.  Economic  Relation  Between  Track  Struc- 
tures and  Traffic  To  Be  Handled. 

The  report  as  published  has  brought  considerable  valuable  discussion  from  a  num- 
ber of  sources,  for  which  we  are  grateful.  The  report  will  be  presented  by  the  sub- 
committee chairman,  Mr.  C.  H.  R.  Howe. 

C.  H.  R.  Howe  (Chesapeake  &  Ohio) :  The  present  discussion  illustrates  in  a 
general  way  an  analytical  method  of  examining  the  elements  that  enter  into  problems 
of  track  and  traffic  economics.  There  is  no  intent  whatever  of  attempting  to  estabhsh 
factual  data  concerning  the  physical  properties  or  values  of  track  materials;  that  is 
the  function  of  committees  other  than  this.  When  such  information  becomes  available 
we  are  very  glad  to  make  use  of  it. 

Concerning  items  of  investment,  replacements  and  labor,  undoubtedly  in  any  specific 
case  local  interest  rates  and  salvage  values  would  be  known  and  given  proper  considera- 
tion, as  they  would  materially  affect  annual  charges.  On  the  individual  railway  it  should 
be  possible  to  break  down  labor  charges  for  specific  tracks,  thus  avoiding  the  necessity 
of  equating.  It  should  also  be  possible  to  segregate  track  laying  costs  from  those  of 
normal  upkeep. 

In  connection  with  the  labor  charges  shown  in  this  report,  a  correction  should  be 
made  in  the  example  given  at  the  bottom  of  page  48  and  in  Table  G.  Beginning  with 
the  last  sentence  of  the  fourth  paragraph  on  page  48  the  text  should  read: 

The  increases  in  labor  costs  are  obtained  through  the  use  of  the  formula  evolved 
on  page  134,  Vol.  40  of  the  Proceedings,  namely,  1.00  -f  (3.3865  X  percent  traffic  density 
increase),  and  adjustment  to  terms  of  the  conversion  factor  of  the  higher  group. 

Take  for  example  the  112-lb.  rail  costs  for  handling  5,248,898  g.t.m.  per  mile  and 
determine  the  costs  of  handling  the  11,309,126  g.t.m.  traffic  of  the  131-lb.  group  on 
the  lighter  rail. 

Interest  remaining  the  same $1 ,290 

Replacement  cost  increasing  in  the  ratio 

11,309,126 

-S;^ii;i^^  2.16X0.05  =  0.108 

Investment  $25,800  X  0.108  =  $2,786 

Increased  labor  cost  1.56  =  1.248  X  $614  (from  Table  F)  =$889 

1.25 
and  1  -1-   (0.386  X   1.16)  =  1.448  X  $889  =  $1,109 

Total  cost  for  131-lb.  track  traffic  on  112-lb.  track ..$5,185 

In  Table  G  the  increased  labor  costs  and  total  costs  should  be  corrected  to  read: 

Increased  Labor  Cost  Total  Cost 

90  1b $    630  $3,427 

100  lb 622  3,392 

112  1b 1,109  5,185 


806  Economics    of    Railway    Location    and    Operation 

The  percent  signs  should  be  omitted  from  Table  G  as  well  as  in  the  example  shown 
on  page  48. 

Vice-President  Clarke:  Is  there  any  discussion?  If  not,  please  proceed,  Mr.  Stout. 
Chairman  Stout:  The  next  subject  is  assignment  No.  4- — Effect  of  volume  of  traffic 
on  railway  operating  expenses.  The  report  here  presented  is  the  fifth  progress  report 
offered  since  the  subject  was  assigned.  It  is  included  in  the  committee  report  as  informa- 
tion and  prehminary  to  a  final  report  with  conclusions.  The  report  will  be  presented 
by  Mr.  J.  F.  Pringle,  the  chairman  of  the  subcommittee. 

J.  F.  Pringle  (Canadian  National):  Determining  the  effect  of  volume  of  traffic 
on  railway  operating  expenses  is  important  for  two  reasons:  It  enables  the  results 
obtained  in  any  previous  period  to  be  scrutinized,  with  a  view  to  taking  action  for 
improvement,  and  it  enables  us  to  make  estimates  for  future  expenditures. 

In  previous  reports  the  committee  has  shown  by  analysis  of  mass  statistical  data 
the  effect  of  volume  of  traffic  as  measured  by  gross  ton-miles,  on  operating  expenses 
as  a  whole.  The  committee  has  also  submitted  a  method  for  determining  the  effect  of 
the  volume  of  traffic  on  maintenance  of  way  and  structures  expenses,  which  method  has 
been  adopted  by  the  Association  and  published  in  the  Manual. 

There  is  also  available  in  a  report  of  the  Mechanical  Division  of  the  AAR  a  method 
of  determining  the  effect  on  maintenance  of  equipment  expenses. 

This  year  the  committee  submits  a  method  for  determining  the  effect  of  volume  of 
traffic  on  transportation  expenses. 

It  will  be  noted  from  the  table  on  page  SO  that  transportation  expenses  account  for 
some  49  percent  of  the  total  operating  expenses.  Therefore,  the  importance  of  this  phase 
of  expenses  will  be  appreciated. 

The  method  as  given  in  detail  in  the  report  consists  of  an  analysis  of  the  effect 
of  volume  on  the  primary  accounts  of  General  Account  No.  4.  It  is  first  necessary 
(and  a  method  is  shown  by  which  this  can  be  done)  to  relate  volume  of  traffic  as 
expressed  in  earnings  to  volume  of  traffic  as  expressed  in  operating  units,  such  as  net 
ton-miles,   train-miles,   and   so   on. 

Then  the  primary  accounts  are  grouped  in  accordance  with  the  service,  that  is, 
station  expenses,  yard  expenses,  train  and  locomotive  operation  expenses,  and  so  on, 
and  the  effect  of  fluctuation  in  volume  of  traffic  on  each  group  is  analyzed  to  arrive 
at  the  percent  of  variations  which  may  be  expected  under  conditions  pertaining  to 
any  particular  property. 

It  must  be  understood  that  the  percentages  shown  here  will  not  apply  on  any 
particular  property,  as  the  conditions  pertaining  on  that  property  have  to  be  taken 
into  consideration,  but,  once  having  determined  the  percentages  for  any  particular 
property,  they  can  be  used  as  long  as  there  are  no  major  changes  in  the  conditions. 

The  committee  is  of  the  opinion  that  this  report  is  of  certain  practical  value  in 
preparing  estimates  of  operating  expenses  based  on  any  given  volume  of  traffic.  It  is 
submitted  as  information,  with  the  recommendation  that  the  subject  be  continued. 

Vice-President  Clarke:  Is  there  any  discussion  of  this  portion  of  the  report?  If 
not,  it  will  be  accepted  as  information. 

Chairman  Stout:  The  fifth  assignment,  Effect  of  inland  waterway  transportation 
on  the  economics  of  railway  operation:  A  comprehensive  report,  the  third  progress 
report  of  information  on  this  assignment,  was  prepared,  but  pubhcation  has  been 
withheld. 

The  sixth  is:  Effect  of  high  speed  on  railway  operating  expenses.  Although  some 
of   the  additional   costs  of   operation   due   to   speed   are   obvious,   their   measure   and   a 


Discussion 807 

complete  determination  of  all  the  added  costs  comprise  a  complicated  problem.  The 
report  on  this  subject,  the  third  progress  report,  will  be  given  by  Mr.  M.  F.  Mannion, 
chairman  of  the  subcommittee. 

M.  F.  Mannion  (Bessemer  &  Lake  Erie):  The  report  outlines  the  method  for 
making  a  preliminary  study  of  the  effect  of  any  increase  in  maximum  speed  on  power 
requirements  and  fuel  and  water  consumption.  Tables  1  and  2  are  composite  summaries 
of  six  different  groups  of  locomotives  and  types  of  trains.  These  tables  are  based  on 
data  contained  in  Chapter  16  of  the  Manual  and  on  train  resistances  which  are  based 
on  the  Davis  formula.  The  tables  give  the  average  weight  of  train  for  any  maximum 
speed,  the  average  speed,  exclusive  of  time  stopped,  for  various  distances  between 
stops,  and  the  horsepower-hours  per  1,000  tons,  traihng  weight. 

An  example  determining  the  increased  power  and  horsepower-hour  requirements 
for  an  increase  of  maximum  speed  from  45  to  60  miles  per  hour  is  shown  on  page  57. 
This  increase  of  15  m.p.h.  in  maximum  speed  would  require  an  increase  of  over 
80  percent  in  the  number  of  locomotives  and  approximately  40  percent  increase  in  the 
coal  and  water  consumption.  The  increase  in  number  of  locomotives  or  number  of 
trains  would  also  result  in  the  same  percentage  increase  in  train  delays.  Wages  of 
engine  crews  would  increase,  as  well  as  equipment  and  track  maintenance. 

Pages  58  to  67,  inclusive,  contain  Exhibit  A  which  is  a  more  detailed  discussion 
of  the  factors  involved  and  conditions  to  be  considered  if  a  detailed  study  of  the  effects 
of  proposed  increased  speeds  is  desired.  The  same  information  shown  in  Tables  1  and  2 
is  shown  in  Tables  3  to  13,  inclusive,  but  these  tables  show  separately  the  information 
for  each  of  the  six  different  groups  of  locomotives. 

On  page  65  is  a  chart  showing  train  resistances  for  passenger  and  freight  cars 
based  on  the  Davis  formula.  On  page  66,  Tables  14  and  15  show  the  maximum  speeds 
for  trains  of  various  weights  on  different  grades.  The  following  conclusions  are  offered: 

It  will  appear  from  the  appHcation  of  the  data  contained  in  these  tables  that 
high  speed  has  a  widespread  influence  not  only  as  regards  fuel  and  water  consumption, 
crew  wages,  and  way  and  equipment  maintenance,  but  also  as  regards  capital  expenditures. 

Actually,  the  operating  expenses  and  capital  expenditures  will  very  likely  be  greater 
than  those  anticipated,  based  on  the  theoretical  data  presented  in  this  report. 

The  report  is  offered  as  information. 

Vice-President  Clarke:  The  effect  of  high  speed  on  both  railway  maintenance 
and  operating  expenses  is  one  of  the  important  subjects  before  us  today.  Is  there  any 
discussion  of  this  report  in  which  the  committee  has  presented  some  very  interesting 
figures  and  tables?  If  not,  the  report  will  be  received  as  information. 

Chairman  Stout:  We  have  no  report  this  year  to  complete  .Assignment  7,  Effect 
of  rail  lubrication  on  train  operation. 

Eighth  assignment,  Economics  of  railway  location  and  operation  as  affected  by 
railway  electrification:  The  progress  reports  on  this  assignment  in  each  of  the  past 
two  years  are  supplemented  by  a  report  of  information.  Present  conditions  on  the 
continents  east  of  the  Atlantic  Ocean  render  it  impossible  to  cover  now  the  countries 
of  that  hemisphere  in  our  studies  of  this  subject.  The  present  report  completes  the 
survey  of  the  countries  of  the  western   continents. 

Professor  E.  E.  King,  chairman  of  the  subcommittee,  is  unable  to  present  the 
report  on  account  of  an  affection  of  his  voice,  which  we  trust  is  only  temporary. 
Under  the  circumstances,  the  report  will  be  presented  by  Mr.  F.  N.  Nye,  a  member 
of  the  subcommittee. 


808  Economics   of   Railway   Location   and   Oper  a  tio  n 


F.  N.  Nye  (New  York  Central):  Two  years  ago  the  subcommittee  presented  a 
report  on  electrification  of  steam  railroads  in  Canada  and  the  United  States.  This 
year  the  subcommittee  has  brought  together  data  on  electrification  of  steam  lines  in  the 
remaining  countries  of  the  western  hemisphere.  These  lines  include  those  in  Mexico, 
Cuba,  Costa  Rica,  the  Argentine,  Bolivia,  Brazil,  Chile  and  Venezuela. 

In  addition,  the  report  includes  electrification  of  steam  lines  in  Australia  and  New 
Zealand.  Table  1  shows  the  locations  of  the  electrified  sections,  the  gage  of  the  track, 
the  total  number  of  miles  electrified,  and  gives  information  concerning  tunnels,  ruling 
grades,  systems  of  electrification,  kinds  of  traffic  involved,  number  and  capacity  of 
motive-power  units,  energy  requirements,  and  reasons  for  electrification.  As  the  last 
column  of  the  table  indicates,  some  of  these  lines  were  electrified  on  account  of  tunnel 
operation,  some  on  account  of  heavy  grades,  some  on  account  of  scarcity  of  fuel,  some 
on  account  of  density  of  traffic,  and  some  to  bring  about  general  economy  in  operation. 

As  you  will  note  in  the  table,  practically  all  installations  are  direct  current  with 
overhead  distribution  systems.  The  voltages  on  the  d.c.  projects  vary  from  600  to 
3,000.  The  only  a.c.  installations  are  on  the  Pacific  Electric  Railway  in  Costa  Rica, 
where  the  power  is  single  phase  with  a  voltage  of  15,000,  and  on  the  Guaqui  to  La  Paz 
Railway  in  Bolivia,  where  the  power  is  three  phase  with  a  voltage  of  575.  In  suburban 
service,  motor  cars  are  commonly  used,  but  for  through  freight  and  passenger  service, 
locomotives  are  generally  employed. 

It  has  not  been  found  feasible  to  get  statistics  from  the  nations  involved  in  the 
present  war.  It  is  the  hope  of  the  subcommittee  that,  when  economic  conditions  in 
those  countries  become  more  stabilized,  we  can  secure  data  from  them  that  will 
enable  us  to  bring  our  report  on  electrification  of  steam  railroads  throughout  the  world 
up  to  date. 

The  subcommittee  is  grateful  for  the  assistance  of  the  Railway  Section,  Transporta- 
tion Division,  Bureau  of  Foreign  and  Domestic  Commerce  of  the  Department  of 
Commerce  of  the  United  States  and  of  the  Electrification  Committee  of  the  National 
Electric  Light  Association. 

This  report  is  presented  as  information. 

Vice-President  Clarke:  Are  there  any  questions?  If  not,  the  report  will  be  accepted 
as   information. 

Chairman  Stout:  Assignment  9,  Effects  of  speeds  in  excess  of  75  m.p.h.  on  the 
economics  of  railway  location:  Three  reports  treating  this  subject  have  been  presented 
heretofore.  The  fourth  report  is  not  ready  for  presentation  at  this  time. 

Assignment  10,  Effect  of  highway  transportation  on  the  economics  of  railway 
operation:  Publication  of  the  progress  report  prepared  on  this  subject  also  has  been 
withheld. 

Assignment  11,  Train  resistance  of  freight  trains  under  various  conditions  of  loading 
and  speed:  This  is  a  new  assignment.  A  first  report  of  information,  consisting  of  the 
survey  and  resume  of  the  more  important  work  which  has  been  done  in  the  establish- 
ment of  general  resistance  formulas  is  offered.  Mr.  L.  K.  Sillcox,  chairman  of  the 
subcommittee,  will  present  the  report. 

L.  K.  Sillcox  (New  York  Air  Brake):  Subcommittee  11  of  Committee  16  was 
named  and  specifically  assigned  to  the  investigation  of  all  available  data  and  literature 
bearing  upon  the  subject  of  freight  train  resistance,  evaluating  their  applicability  to 
modern,  high-speed  operation  and,  if  possible,  the  derivation  of  a  recommended  method 
of  resistance  determination,  the  method  to  include  modifying  factors  to  obtain  in 
specific  conditions. 


Discussion  809 


Certain  train  resistance  components  were  designated  for  special  investigation  and 
study,  namely, 

1.  Effect  of  rail  lubrication  upon  curve  resistance 

2.  Rail  weight  and  condition 

3.  Track  condition 

4.  Atmospheric  temperature 

5.  Effect  of  side  winds. 

Unfortunately,  the  literature  pertaining  to  these  five  important  components  of  the  total 
resistance  value  is  meager  due  partly  to  the  but  recent  recognition  of  the  magnitude  of 
their  effect  upon  the  total,  and  partly  to  their  increased  significance  with  modern  high 
operating  speeds. 

In  partial  fulfillment  of  that  assignment,  an  introductory  report  has  been  presented 
on  pages  69  to  86,  wherein  many  general  train  resistance  formulas  were  reported.  Each 
of  these  has  had  at  least  limited  or  local  use  during  some  period  of  years  and  on  one 
or  more  railway  systems.  The  report  also  includes  discussion  of  the  effect  of  the 
various  train  resistance  components,  both  inherent  and  incidental.  The  committee  has 
deviated  from  its  specific  assignment  to  the  extent  that  factors,  derived  through  the 
operation  of  passenger  trains,  have  been  investigated  for  the  reason  that  much  of  the 
most  valuable  and  reliable  data,  applicable  to  freight  as  well  as  passenger  trains,  were 
derived  by  the  operation  of  test  passenger  trains. 

This  introductory  report  further  presents  the  results  of  the  committee's  initial 
search  for  data  pertinent  to  items  1,  2  and  3,  above,  being:  First,  the  data  accumulated 
by  the  Denver  &  Salt  Lake  Railroad  in  its  investigation  of  reductions  in  curve  resistance 
obtainable  by  lubrication  of  flange  and  rail ;  second,  those  obtained  by  the  Kansas  City 
Southern  Railway  during  its  test  of  resistance  encountered  on  rail  of  various  weights, 
both  with  new  and  old  contours;  and  third,  the  Association  of  American  Railroad's 
tests  conducted  on  the  tracks  of  the  Pennsylvania,  the  Chicago  &  North  Western,  and 
the  Union  Pacific. 

The  Davis  formulas  are  generally  accepted  as  being  basically  sound  and  as  being 
stated  in  a  form  consistent  with  known  characteristics  of  the  primary  components; 
journal,  flange,  vibration  and  impact,  and  air  resistances.  More  recent  experiments 
on  current  design,  as  exemplified  by  the  lightweight,  streamlined  trains,  have  indicated 
to  some  authorities  the  desirability  of  applying  modifying  factors  when  the  formulas 
are  employed  in  the  determination  of  the  resistances  of  such  equipment. 

Acknowledging  the  reliability  of  the  Davis  formulas,  it  is  now  proposed  to  attempt 
the  derivation  of  modifying  factors  which  would  compensate  for: 

1.  Effect  of  track  modulus  and  rail  weight 

2.  Temperature  effects 

3.  Effect  of  side  winds 

and,  in  the  case  of  passenger  equipment  with  a  possible  important  influence  in  some 
freight  services,  a  fourth  element,  air  conditioning  or  forced  air  circulation.  Since 
available  test  data,  bearing  upon  temperature  effects,  are  limited  in  scope,  and  in  very 
few  cases  have  attempts  been  made  to  analyze  such  data  by  the  railways  to  permit 
general  derivations,  the  possibility  of  establishing  a  reasonable  guide  for  the  rating  of 
locomotives  under  conditions  of  severe  cold,  is  quite  remote.  The  characteristics  of 
track  modulus  and  rail  weight,  as  they  influence  train  resistance,  may  be  analytically 
examined.  Also,  it  is  hoped  that  the  effect  of  side  winds  upon  flange  friction  will  lend 
itself  to   analytical  analysis,   using   as   a   base   the   results   of   thoughtfully   planned   and 


810 Electricity 

carefully  executed  test  programs  completed  in  wind  tunnels.  Fortunately,  several  such 
programs  have  been  successfully  conducted  and  the  results  contributed  for  the 
common  good. 

Vice-President  Clarke:  While  this  is  a  new  assignment  and  this  is  the  first  report, 
the  committee  has  presented  information  of  great  value.  Is  there  any  discussion?  If 
not,  the  report  will  be  accepted  as  information. 

Chairman  Stout:  The  following  three  assignments  are  new:  Development  of  modern 
power  units  and  the  effects  on  the  economics  of  railway  location  and  operation;  The 
general  course  of  the  cost  of  railway  transportation  and  operation  over  the  past  100 
years,  the  principal  determining  elements  and  the  economic  significance;  and.  The 
advantage  derived  from  stiffness  of  track  in  improving  economics  of  train  operation. 
During  the  past  year  these  subjects  have  been  under  active  consideration  and  study, 
but  we  have  no  reports  ready  for  presentation  to  this  convention. 

That  completes  the  report  of  Committee  16 — Economics  of  Railway  Location  and 
Operation. 

Vice-President  Clarke:  The  economics  of  railway  operation  is  one  of  the  most 
important  subjects  which  we  will  have  to  consider.  While  our  primary  responsibiUty 
is  the  maintenance  of  the  railroads,  it  is  also  our  responsibiUty  to  maintain  them  so 
they  can  be  most  economically  operated.  Is  there  any  general  discussion?  If  not,  the 
committee  is  excused  with  the  thanks  of  the  Association.  (Applause) 

Discussion  on  Electricity 

(For  Report,  see  pp.  28-30.) 

(Vice-President  Bond  presiding) 

Chairman  H.  F.  Brown  (New  York,  New  Haven  &  Hartford) :  The  report  of  the 
Committee  on  Electricity  might  read  "from  microwatts  to  kilowatts"  because  I  know 
of  no  industry  which  uses  electricity  in  the  breadth  of  application  that  the  railroads  do. 
We  have  in  mind  microwatts  in  the  use  of  the  smallest  amount  of  current  that  it  is 
possible  to  detect,  in  amphfying  devices,  in  radio  tubes;  and  kilowatts  where  we  are 
moving  the  heaviest  types  of  freight  trains,  tonnage  trains  that  are  moved  on  any 
railroad  in  the  country  today,  for  example  as  on  the  Norfolk  &  Western  and  on  the 
Virginian.  Truly  it  is  "from  microwatts  to  kilowatts." 

I  am  not  going  to  try  to  give  you  a  complete  synopsis  of  the  report,  as  it  is 
presented  in  Bulletin  420  which  was  prepared  during  my  incapacity  the  past  summer 
by  the  vice  chairman,  Mr.  D.  B.  Thompson.  It  is  there  for  you  to  read,  and  it  is 
interesting   reading. 

One  has  only  to  look  at  the  exhibits  in  the  current  show  at  the  National  Railway 
Appliances  Exhibit  this  year  to  see  the  scope  of  the  application  of  electricity  to  the 
railroads.  It  is  used  in  all  types  of  track  maintenance.  It  is  used  in  nearly  every  de- 
partment of  railway  activity,  from  the  lighting  of  office  buildings  to  the  operation  of 
shop  machinery  and  the  operation  of  trains. 

The  year  has  seen  no  great,  outstanding  development  of  any  one  phase,  but  the 
use  and  scope  have  broadened.  Possibly  the  most  noted  improvement  in  the  application 
has  been  in  illumination.  You  are  all  famihar  with  new  types  of  illuminants  which 
we  now  have  available  in  the  fluorescent  lighting  units;  great  strides  are  being  made. 
It  is  safe  to  prophesy  that  within  the  next  ten  years  our  illumination  will  be  of  an 
entirely  different  order  than  it  is  today.  This  is  making  for  economy  because  all  of 
these  devices  are  operating  at  higher  levels  of  efficiency,  with  smaller  power  consump- 
tion and,  therefore,  lower  costs. 


Discussion 811 

The  development  of  power  in  itself  is  becoming  cheaper.  Newer  and  more  efficient 
power  plants  are  being  built.  Power  is  cheaper.  Power  production  in  connection  with 
water  power,  in  large  concentrated  areas,  is  being  continually  improved  and  made. 
For  example,  Boulder  dam  and  Bonneville  dam  are  notable  examples  of  concentrated 
water  power  developments.  Ultimately  the  power  developed  there  will  find  its  applica- 
tion on  railroads  in  tributary  areas. 

The  standardization  of  air  conditioning  equipment  is  going  forward  with  particu- 
lar reference  to  the  standby  equipment  necessary  in  the  large  terminals  for  taking 
care  of  parked  cars  and  for  cars  which  are  arriving  and  must  lie  over  for  short  periods 
during  their  further  movement. 

The  air  conditioning  development  itself  is  so  rapid  that  no  time  was  available  for 
much  of  the  standardization  required.  This  is  now  going  forward  at  a  rapid  pace. 

An  interesting  example  of  how  electricity  can  be  used  to  serve  almost  any  purpose 
was  had  this  last  year  at  Memphis,  Tenn.,  where  Diesel-electric  locomotives  were  parked, 
and  the  current  from  these  locomotives  was  used  to  operate  the  cars  parked  for  a 
large  convention.  The  electrical  engineer  is  a  man  who  has  to  have  a  great  deal  of 
imagination  of  how  he  can  best  apply  all  these  various  tools  to  new  and  novel  uses. 

The  report  touches  on  the  further  development  of  circuit  breakers.  The  air  circuit 
breaker  is  being  rapidly  developed  to  supplant  oil  circuit  breakers  where  the  use  of 
oil  presents  a  fire  hazard. 

Mr.  Post,  in  his  report  a  few  moments  ago,  told  you  how  supervisory  control  is 
being  appUed  to  signahng.  It  is  a'so  being  apphed  to  outlying  facilities.  The  operation 
of  pumps,  the  operation  of  various  types  of  facilities  can  be  controlled  very  simpl\- 
and  very  economically  and  easily  today  over  telephone  lines  by  this  new  development  of 
supervisory  control. 

The  second  assignment  of  the  Committee  on  Electricity  is  to  review  the  current 
activities  of  the  Electrical  Section.  The  committee  reports  were  published  in  full  in 
Bulletin  419  and  I  will  not  attempt  to  go  into  detail  concerning  them  except  to 
call  your  attention  to  the  broad  scope  covered  by  the  section.  It  has  standing  com- 
mittees deaUng  with  power  supply,  electrolysis,  electric  heating  and  welding,  the  appli- 
cation of  motors,  clearances  for  third  rail  and  overhead  working  conductors,  track 
and  third-rail  bonds,  illumination,  high  tension  cables,  and  the  application  of  corrosion- 
resisting  materials  to  railroad  electrical  construction. 

In  mentioning  these,  I  would  like  to  call  your  attention  to  the  research  work 
that  has  been  done  by  the  Committee  on  the  Application  of  Corrosion-Resisting  Ma- 
terials. This  has  been  referred  to  each  year  for  the  last  five  years,  and  the  work  this 
year  practically  completes  the  studies  which  were  started  some  ten  years  ago  to 
determine  which  of  a  great  number  of  commercial  alloys  are  best  adaptable  for  use 
not  only  on  electrified  railroads  but  on  any  railroad  where  smoke  and  the  atmospheric 
pollution  of  neighboring  industries  causes  so  much  damage  and  loss  through  the  corrosion 
of  ferrous  materials. 

That  this  particular  subject  has  been  of  great  interest  is  evidenced  by  the  fact 
that  your  secretary  has  had  a  great  many  calls  for  copies  of  this  report  from  the 
suppliers  and  manufacturers  who  are  dealing  with  railroad  hardware.  This  is,  I  feel, 
a  real  contribution  to  railway  engineering. 

I  would  be  entirely  lacking  in  appreciation  if  I  did  not  add  my  own  personal 
word  of  appreciation  to  the  great  help  that  the  Electrical  Section  has  had  each  year 
from  the  American  Railway  Engineering  Association.  It  has  been  my  good  fortune  to 
have  been  in  contact  with  the  various  presidents  of  your  Association  in  connection  with 


812  Waterways   and   Harbors 

my  work  in  the  Electrical  Section  for  the  past  four  years,  and  each  year  I  have  found 
that  the  directors  and  officers  of  the  Engineering  Association  have  been  most  helpful 
to  the  Electrical  Section.  I  want  to  add  my  own  tribute  to  what  has  been  said  of 
Mr.  Fanning  this  morning.  Mr.  Fanning,  last  October,  came  to  our  annual  meeting 
and  addressed  us,  and  he  gave  me  personally  a  great  deal  of  good,  sound  advice  and 
help.  I  sincerely  regret  as  much  as  anyone  in  this  room  his  untimely  passing.  I  want 
to  bespeak  for  my  successor  in  the  Electrical  Section  the  same  cooperation  that  I  have 
had  the  past  four  years  from  your  officers.  Thank  you. 

Vice-President  Bond:  Any  discussion  on  the  report  as  presented?  If  there  is  no 
further  discussion,  Mr.  Brown,  I  want  to  thank  you  very  much  for  presenting  a 
difficult  report  in  a  very  interesting  way,  also  for  the  resume  of  the  work  of  the  Electrical 
Section.  We  arc  very  much  indebted  to  you.  (Applause) 

Discussion  on  Waterways  and  Harbors 

(For  Report,  see  pp.  87-93.) 

(Vice-President  Bond  presiding) 

Chairman  G.  P.  Palmer  (Baltimore  &  Ohio  Chicago  Terminal):  We  have  nothing 
to  report  on  Revision  of  Manual. 

On  subject  2,  we  completed  the  report  last  year  with  the  exception  of  some  defini- 
tions which  were  withheld  for  certain  changes  and  are  now  presented  for  approval  and 
inclusion  in  the  Manual.  The  three  definitions  of  words  used  in  the  report  that  was 
presented  last  year  you  will  find  at  the  top  of  page  88,  and  I  will  read  them  as  they 
are  now  submitted. 

(Chairman  Palmer  then  read  the  three  definitions  at  top  of  page  88.) 

Chairman  Palmer:  I  move  that  these  three  definitions  be  adopted  for  inclusion  in 
the   Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Palmer:  The  report  on  Assignment  4  will  be  submitted  by  the  sub- 
committee chairman,  Mr.  Hyde. 

N.  D.  Hyde  (New  York  Central) :  The  study  of  metal  and  other  protective  casings 
for  pier  structures  under  water  was  first  assigned  last  year.  Several  types  of  such 
casings  are  manufactured  and  on  the  market.  There  are  experimental  installations  in 
several  places  on  the  Atlantic  seaboard.  None  of  them  has  been  in  use  a  sufficient 
length  of  time  so  that  conclusions  can  be  reached  as  to  their  effectiveness.  We  therefore 
suggest  that  the  subject  be  kept  open  for  further  report. 

Vice-President  Bond:  Accepted  as  a  progress  report. 

Chairman  Palmer:  Assignment  6.  Seawalls  and  ocean  shore  protection,  including 
wave  action  and  ice:  Mr.  Smith,  the  subcommittee  chairman,  is  not  present.  There- 
fore, I  will  attempt  to  give  the  report. 

The  information  contained  herein  has  been  obtained  from  various  publications 
as  shown  on  page  90,  and  is  really  a  summary  of  conclusions  reached  by  various 
authorities,  including  the  office  of  the  chief  of  engineers,  U.  S.  Army,  and  other 
associations. 

The  conclusions  of  this  report  are  as  follows:  Seawalls  of  various  design  and 
groins  may  be  properly  used  in  protecting  shores  and  beaches  after  careful  studies  of 
all  conditions  have  been  concluded  to  enable  the  selection  of  an  adequate  design  of 
seawall  or  groin  or  a  combination  of  both. 


Discussion 813 

No  recommendations  are  made  with  reference  to  any  effective  type  of  structure 
by  reason  of  the  great  variance  in  conditions. 

This  report  is  submitted  as  information.  However,  included  in  this  report  we 
have  a  definition  for  the  word  "groin"  which  we  recommend  for  inclusion  in  the 
Manual.  It  reads  as  follows: 

Groin. — A  barrier  extending  into  the  water  from  a  beach  to  arrest  traveling  sand 
and  shingle  and  to  give  protection  against  wave-wash  or  current.  A  small  jetty. 

I  move  that  this  definition  for  groin  be  included  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Palmer:  Report  on  assignment  7.  Reasonable  life  of  steel  casings  im- 
mersed in  sea  water:  This  report  will  be  given  by  Mr.  Faucette,  the  subcommittee 
chairman. 

W.  D.  Faucette  (Seaboard  Air  Line):  Those  who  are  close  to  the  coast,  who  have 
to  deal  with  brackish  water  and  sea  water  may  find  this  report  rather  educational. 
The  subject  was  assigned  to  this  committee  some  two  or  three  years  ago,  and  after 
your  subcommittee  chairman  had  considered  the  question  of  approach  to  the  subject, 
he  learned  that  the  War  Department,  through  the  office  of  the  chief  of  engineers  and 
more  particularly  through  the  Beach  Erosion  Board  at  Washington,  was  investigating 
at  some  length  a  report  on  steel  sheet  pihng  in  various  parts  of  the  country  and  was 
carrying  this  work  on  in  considerable  detail  and  thoroughness.  In  view  of  the  time 
and  care  that  was  being  devoted  to  this  investigation  by  the  War  Department,  it  was 
the  opinion  of  the  subcommittee  that  its  study  could  be  pursued  to  greater  advantage, 
if  it  were  deferred  until  the  War  Department's  report  was  more  nearly  complete. 

I  had  several  conferences  with  the  Beach  Erosion  Board  and  with  some  of  the 
investigators  who  are  going  into  this  subject  in  a  rather  thorough  way.  It  is  natural 
that  a  study  of  this  kind  must  be  progressive.  But  if  you  are  really  interested  from 
an  engineering  point  of  view,  it  will  pay  you  to  read,  when  you  get  home,  pages  90, 
91,  92  and  93.  The  information  that  is  set  forth  in  the  pamphlet  issued  by  the  Depart- 
ment of  Scientific  and  Industrial  Research  under  the  title  "Deterioration  of  Structures 
in  Sea  Water"  which  is  designated  as  the  Seventeenth  Interim  Report  of  the  Committee 
of  the  Institute  of  Civil  Engineers,  London,  England,  printed  in  1938,  is  very  inter- 
esting. On  page  91  are  the  conclusions,  which  I  wiU  not  read,  but  they  are  worth 
your  time. 

Of  course,  a  good  many  of  you  are  familiar  with  Dr.  William  F.  Clapp's  work 
at  Duxbury,  to  which  I  allude  on  page  92. 

If  you  have  any  problems  that  touch  upon  this  subject,  and  think  it  is  worth 
while  to  go  to  Washington,  you  will  get  a  very  cordial  reception  on  the  part  of  the 
War  Department  at  the  Beach  Erosion  Board  headquarters.  We  have  recently  had 
some  problems,  and  we  found  the  board  very  helpful  in  discussing  the  matters  with  us. 

The  information  on  page  93  is  given  as  a  progress  report  with  respect  to  the 
annual  loss  of  metal  thickness  in  inches  at  certain  elevations.  This  is  rather  illuminating 
but  is  not  to  be  taken  as  a  definite  conclusion  in  any  way  whatsoever. 

Your  subcommittee  offers  these  data  and  this  progress  report  as  information  to 
those  who  are  particularly  interested  in  the  subject  of  the  reasonable  life  of  steel 
casings  immersed  in  sea  water.  The  committee  feels  that  the  subject  should  be  con- 
tinued into  the  next  year  or  two,  at  least. 

Chairman  Palmer:  This  completes  the  report  of  Committee  25. 

Vice-President  Bond:  If  there  is  no  discussion,  the  committee  will  be  excused 
with  the  thanks  of  the  Association  for  its  very  valuable  work.  (Applause) 

A 


814 Highways 

Discussion  on  Highways 

(For  Report,  see  pp.  149-153.) 

(Vice-President  Bond  presiding) 

Chairman  J.  G.  Brennan  (Association  of  American  Railroads):  Assignment  1.  Revi- 
sion of  Manual:  This  is  a  progress  report  and  it  is  hardly  necessary  to  read  it.  The 
committee  will  continue  the  work  during  the  coming  year  and  hopes  to  have  a  report 
for  the  convention  next  year. 

The  report  on  assignment  No.  2 — Design  and  specifications  for  highway  crossings 
at  grade  over  railway  tracks,  both  steam  and  electric,  is  likewise  a  progress  report, 
and  it  is  not  necessary  to  read  that. 

Assignment  No.  3 — Comparative  merits  of  various  types  of  grade  crossing  pro- 
tection: Mr.  H.  M.  Shepard,  the  chairman  of  the  subcommittee,  is  not  here,  so  I 
am  going  to  ask  Mr.  G.  P.  Palmer,  who  has  been  very  active  in  this  particular  work, 
to   make  the   report  for  the  committee. 

G.  P.  Palmer  (Baltimore  &  Ohio  Chicago  Terminal):  This  is  a  new  subject  on 
which  we  are  just  starting  to  gather  information,  collaborating  with  Committee  10 — 
Singals  and  Interlocking,  of  the  Signal  Section,  AAR,  and  the  Highway  Research 
Board. 

During  the  year  just  passed,  we  endeavored  to  assemble  data  on  various  types  of 
reflectorized  crossbuck  signs  now  on  the  market  or  proposed  to  be  placed  on  the 
market.  This  report,  as  information,  covers  several  different  types  of  material  being 
used.  Since  this  report  was  written,  one  of  the  signs  of  the  Reflecting  Metal  Corpora- 
tion has  been  installed  at  104th  street  in  Chicago,  for  test.  On  the  Scotchlite  sign, 
two  more  signs  have  been  placed  at  Central  avenue  near  103rd  street,  just  outside 
of  Chicago,  and  two  of  the  signs  of  the  Cuneo  Press,  which  were  put  up  last  August 
and  blown  down  in  the  windstorm  on  November  11,  have  been  replaced  and  are 
again  located  at  105th  and  Rockwell  streets. 

The  purpose  of  these  signs  is  to  test  them  under  all  weather  conditions  which 
any  sign  has  to  stand  while  it  is  in  service.  We  of  course  do  not  expect  to  get  any 
definite  conclusion  from  these  tests  for  some  Uttle  time,  but  the  committee  has  in 
mind  testing  other  signs  at  other  points  in  the  immediate  future. 

This  report  is  submitted  as  information  with  the  recommendation  that  the  subject 
be  continued. 

Vice-President  Bond:  Any  discussion?  If  not,  the  report  will  be  accepted  as 
information. 

Chairman  Brennan:  Assignment  No.  4 — Prepare  drawings  of  typical  location  for 
grade  crossing  signals,  for  various  degrees  of  crossing  angles:  Mr.  A.  P.  Button,  chair- 
man of  the  subcommittee,  will  present  the  report. 

(A.  P.  Button,  New  York  Central,  read  the  report  on  assignment  4.) 

Vice-President  Bond:  The  committee's  recommendation  as  stated  in  the  report  will 
be  duly  submitted  to  the  Committee  on  Outline  of  Work. 

Chairman  Brennan:  Assignment  7 — Recommend  methods  of  protecting  highway 
crossings  and  flangeways  against  obstructions  and  damage  caused  by  use  or  passage 
of  highway  work  equipment:  Mr.  Bernard  Blum,  chairman  of  the  subcommittee,  will 
make  the  report. 

Bernard  Blum  (Northern  Pacific):  The  report  was  prepared  to  meet  a  condition 
that  has  arisen  several  times  in  the  past  few  years  by  serious  accidents  at  highway- 
railroad  grade  crossings  where  equipment  of  the  highway  departments  has  been  struck 


Disc  u  ssion 815 

by  trains  and,  in  some  cases,  derailment  of  trains  at  highway  grade  crossings  have 
occurred  because  the  flangeways  became  filled  up  with  dirt  or  gravel  or  ice  in  the 
course  of  work  of  the  highway  department. 

It  hardly  seems  necessary  to  read  the  report  which  is  given  in  the  form  of  instruc- 
tions to  be  issued  by  the  several  highway  departments  to  their  employees.  Several 
states  have  issued  instructions  in  line  with  these  recommendations.  One  state,  I  am 
advised,  has  adopted  it  as  submitted  and  several  states  in  the  Northwest  have  adopted 
it  substantially  in  the  form  it  was  originally  prepared,  but  with  a  few  corrections. 

It  is  believed  it  will  be  of  considerable  advantage  in  the  work  of  safety  on  the 
highways  and  on  the  railroads. 

The  other  recommendation  about  submitting  it  to  the  American  Association  of 
State  Highway  Officials  will  be  taken  care  of  in  due  course. 

I  move  that  it  be  adopted  and  printed  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Brennan:  It  may  be  of  interest  to  you  gentlemen  to  know  that  these 
requisites  have  already  been  adopted  by  the  State  Highway  Department  of  Arkansas. 
I  was  so  informed  this  morning  by  Mr.  R.  E.  Warden  from  that  state. 

This  completes  the  report  of  Committee  9. 

Vice-President  Bond:  Any  further  discussion  on  the  report  as  submitted?  If  not, 
I  wish  to  say  that  the  work  of  your  committee  is  very  much  appreciated,  and  you  are 
excused  with  the  thanks  of  the  Association.   (.Applause) 

Discussion  on  Cooperative  Relations  with  Universities 

(For  ReiJort,  .see  pp.    155-171.) 

(Vice-President   Bond   presiding) 

Chairman  E.  T.  Howson  (Railway  Age) :  Your  Committee  on  Cooperative  Rela- 
tions with  Universities  presents  its  first  report,  having  been  re-created  shortly  prior 
to  the  last  convention.  It  has  devoted  its  attention  up  to  the  present  largely  to  work 
of  an  exploratory  character,  looking  to  the  development  of  the  scope  of  the  assign- 
ments given. 

The  work  of  this  committee  differs  from  that  of  other  committees  of  the  Associa- 
tion in  that  it  is  not  dealing  primarily  with  materials  or  detailed  i^ractices  of  working; 
neither  is  it  concerned  with  the  immediate  present.  Rather  it  is  dealing  with  a  problem 
of  management,  the  full  impact  of  which  will  not  be  felt  for  some  years.  Its  work  is. 
however,  of  fundamental  importance  to  the  permanent  well  being  of  the  railway  industry 
of  which  we  are  all  a  part. 

The  railways  comprise  one  of  our  largest  industries.  They  are  an  industry  whose 
maximum  efficiency  is  essential  to  the  industrial  life  of  this  country.  The  railways  are 
meeting  new  and  increasingly  intensive  competition  from  other  agencies  of  transporta- 
tion. .'Ml  of  these  conditions  place  a  great  responsibility  on  railway  managements,  and 
they  demand  that  the  railways  bring  into  their  organizations  men  of  the  highest  ability 
in  order  that  they  may  be  able  to  cope  with  and  solve  these  problems  as  they  arise 
from  year  to  year  in  the  future. 

A  far  larger  proportion  of  the  more  promising  young  men  are  now  enjoying  the 
privileges  of  a  college  education  than  in  any  previous  generation.  It  is  pertinent,  there- 
fore,   to    inquire    whether    the    railways   are    attracting    their    due    proportion    of    these 


816 Cooperative    Relations   with    Universities 

young  men  of  promise.  It  is  pertinent,  also,  to  inquire  whether  the  colleges  and  uni- 
versities are  training  these  young  men  in  matters  of  education  and  in  point  of  view 
to  prepare  them  best  for  service  in  the  railway  industry. 

Railroading  has  changed  greatly  in  recent  years.  It  is  no  longer  an  industry,  from 
an  engineering  standpoint,  of  extensions.  It  is  an  industry  now  of  intensive  develop- 
ment. That  requires  a  different  type  of  engineering,  and  yet  it  is  a  type  of  engineering 
that  is  of  just  as  high  grade,  yes,  even  higher  grade  than  that  of  the  pioneers  of  a 
generation  ago.  Engineering  today  requires  a  more  thorough  appreciation  and  knowledge 
of  economics  as  applied  to  transportation,  a  greater  willingness  to  develop  plans  and 
practices  to  effect  economies  in  costs  and  to  increase  effectiveness  in  service.  In  fact, 
it   requires  a  far  greater  degree  of  exactness. 

(At  this  point  Mr.  Howson  presented  the  substance  of  the  last  three  paragraphs 
of  the  Statement  of  Scope  and  Purpose  appearing  on  page  157.) 

Mr.  Howson:  Your  committee  has  been  instructed  by  the  Board  to  study,  among 
other  subjects,  that  of  stimulating  greater  cooperation  between  railway  officials  and 
officers  of  universities  and  colleges  in  preparing  the  best  courses  of  instruction  to  meet 
changing  railway  problems.  The  committee  has  this  subject  under  study  but  has  no 
report  to  present  at  this  convention. 

The  committee  was  also  instructed  to  call  the  attention  of  universities  and  colleges 
to  such  information  and  conclusions  developed  by  the  Association  as  would  be  thought 
to  be  of  special  interest  or  value  to  them.  That  subject  is  also  in  process  of  develop- 
ment, but  the  committee  is  not  yet  prepared  to  report. 

The  committee  was  instructed  to  develop  means  of  bringing  to  the  attention  of 
railway  managements  the  value  of  a  technical  education  as  a  qualifying  factor  for 
young  men  desiring  to  enter  railway  service  with  a  view  to  advancement.  The  com- 
mittee has  a  report  of  progress  to  present.  Mr.  Schwinn,  chairman  of  the  subcommittee, 
will  present  the  report. 

F.  S.  Schwinn  (Missouri  Pacific  Lines) :  Because  of  the  broad  scope  and  importance 
of  the  subject,  your  committee  has  undertaken  to  develop  its  study  progressively.  This 
year's  report  deals  with  the  possible  opportunities  offered  by  railways  to  technically 
educated  and  other  college  men,  coupled  with  the  views  of  several  railway  executives. 
Much  of  the  report  is  in  the  form  of  quotations  from  men  whose  opinions  are  valuable, 
although  these  opinions  are  not  unanimous  in  every  respect. 

Without  undertaking  to  read  extensively  from  this  report,  we  wish  to  direct  atten- 
tion to  the  fact  that  these  railway  executives  were  practically  unanimous  in  that  they 
favored  employing  college  men,  that  they  believed  that  college  men  would  meet  the 
requirements  of  advanced  positions  more  satisfactorily  than  those  without  a  college 
education,  all  other  factors  being  equal,  and  that  the  technical  or  college  man  might 
be  expected  to  advance  more  rapidly  than  a  man  without  such  advantages. 

A  very  excellent  composite  picture  of  the  attitude  of  railway  executives  is  ex- 
pressed in  a  letter  written  by  Mr.  F.  E.  Williamson,  president  of  the  New  York  Central 
System.  From  this  I  quote: 

(He  read  the  paragraph  at  the  bottom  of  page  167  and  the  top  of  page  168.) 
Mr.  Schwinn:  Those  of  you  who  are  responsible  for  the  efficient  organization  of 
a  department,  technical  or  otherwise,  and  who  are  considering  not  only  today  but 
also  tomorrow  will  find  this  report  interesting  and  helpful  to  your  managements  as 
well  as  to  yourselves.  I  cannot  urge  too  strongly  that  you  bring  it  to  the  attention  of 
your  managements. 


Discussion 817 

The  brief  review  of  this  report  given  on  page  168  includes  your  committee's  pre- 
liminary observations  which  are  introduced  for  the  purpose  of  stimulating  the  attention 
and  concern  of  railway  managements  in  the  young  college  men,  and  to  indicate  to 
those  men  the  attributes  required  for  success  in  the  railway  industry. 

During  the  coming  year  it  is  intended  to  carefully  analyze  and  report  on  the 
practices  followed  by  other  industries  in  the  selection  and  training  of  college  men,  by 
which  the  committee  will  show  the  growing  importance  given  to  technical  education 
by   these   industries. 

Chairman  Howson:  The  committee  was  also  asked  to  stimulate  a  greater  interest 
in  the  science  of  transportation  among  university  and  college  students,  and  create 
thereby  a  greater  appreciation  of  the  place  of  transportation  in  our  national  economic 
structure.  Professor  W.  C.  Sadler,  chairman  of  that  subcommittee,  will  present  this 
report. 

W.  C.  Sadler  (University  of  Michigan):  I  think  in  reading  this  report  I  should 
call  your  attention  to  the  fact  that  the  committee  thought  it  was  to  the  interest  of 
the  railroads  to  concern  themselves  with  university  students,  not  only  from  the  point 
of  view  of  potential  material  for  employment  but  also  from  the  point  of  view  of  poten- 
tial shippers;  particularly  in  the  field  of  engineering,  the  railroads  had  a  very  vital 
interest  in  university  circles. 

(Mr.  Sadler  then  read  the  report  on  Assignment  4.) 

Chairman  Howson:  The  committee  has  been  instructed,  also,  to  develop  means 
whereby  facilities  of  the  universities  may  be  made  more  directly  available  for  research 
work  of  the  Association  and  the  railway  industry  by  cooperative  effort  between  the 
staffs  of  the  universities  and  the  committees  of  the  Association.  That  subcommittee  has 
a  report  to  present  to  you.  Its  chairman  is  Professor  Russell.  In  his  absence,  the  report 
will  be  presented  by  Mr.  Lem  Adams. 

Lem  Adams  (Oxweld  Railroad  Service):  Your  committee's  first  activity  has  been 
to  develop,  by  means  of  a  questionnaire,  as  complete  information  as  possible  regarding 
the  present  facilities,  personnel,  activities,  and  interests  of  the  various  schools  bearing 
on  railroad  problems,  as  well  as  a  compilation  of  the  subjects  already  investigated  and 
the  reports  that  are  available  for  distribution. 

Information  of  this  character  can  be  collected  most  readily  from  the  colleges  giving 
engineering  degrees,  of  which  there  are  about  145  in  the  United  States.  A  questionnaire 
was  sent  to  125  of  these  schools.  This  questionnaire  included  the  following  questions: 

(He  then  read  the  questions  listed  on  page  170,  and  gave  the  substance  of  the 
concluding  paragraph  of  the  report.) 

Chairman  Howson:  The  committee  was  instructed  to  stimulate  a  greater  apprecia- 
tion among  university  and  college  authorities  of  the  fundamental  importance  of  instruc- 
tion in  transportation  and  economics,  and  of  the  necessity  for  assigning  men  of  adequate 
ability,  experience  and  fitness  for  such  teaching.  The  committee  has  that  subject  under 
way.  It  has  no  report  to  present  at  this  time. 

The  committee  was  instructed  to  cooperate  with  organizations  of  university  and 
college  students  engaged  in  study  or  discussion  of  engineering  or  transportation  matters 
and  contribute  to  their  activities  in  such  manner  as  may  be  mutually  arranged.  The 
chairman  of  that  subcommittee  is  Mr.  Gault  who  is  unable  to  be  with  us  because 
of  illness.  Mr.  Faucette,  a  member  of  the  subcommittee,  will  present  the  report. 

W.  D.  Faucette  (Seaboard  Air  Line) :  It  is  with  much  regret  that  we  record  Mr. 
Gault's  sickness  and  absence  from  this  work  and,  in  his  behalf  I  can  no  better  para- 
phrase  the   assignment   than   to   re-read   what   it   is:   "Cooperate   with   organizations   of 


818  Cooperative    Relations    with    U  niversities 

university  and  college  students  engaged  in  study  or  discussion  of  engineering  or  trans- 
portation matters  and  contribute  to  their  activities  in  such  manner  as  may  be  mutually 
arranged." 

The  deans  of  17  colleges  were  communicated  with,  and,  as  you  will  note  in  the 
progress  report,  14  of  them  replied.  We  digested  and  give  you  briefly  on  page  171 
the  five  general  headings  under  which  this  matter  falls  in  the  replies. 

This  is  a  progress  report.  It  must  be  realized  by  the  membership  that  this  com- 
mittee, reconstituted  only  a  year  ago,  must  necessarily  make  its  progress  with  some 
deliberation  and  some  care  in  approaching  this  very  large  assignment. 

In  behalf  of  the  subcommittee  and  for  the  committee  as  a  whole,  I  would  like 
to  say  that  this  cooperation  with  these  universities  and  colleges  may  sometimes  have 
to  come  solely  through  railroads  with  colleges  and  universities  local  to  those  systems. 
If  those  colleges  and  universities  which  are  local  to  certain  railroad  systems  do  not 
receive  the  cooperation  from  them,  the  chance  that  they  will  receive  it  from  anybody 
else  in  the  railroad  field  is  very  remote. 

Therefore,  although  you  are  not  members  of  this  special  committee,  we  urge  you 
to  investigate  yourselves  what  colleges  and  universities  or  institutions  are  local  to 
your  railroad  system,  and  ask  you  to  make  a  contact  with  them  in  such  a  way  as  to 
indicate  that  you  are  cooperatively  interested  in  them,  and  in  the  subject  of  this 
assignment. 

You  must  remember  that  in  the  progress  of  this  American  Railway  Engineering 
Association,  in  probably  a  generation  or  at  least  a  half  generation,  the  active  member- 
ship and  the  active  direction  and  administration  of  this  Association  and  the  railroads 
too,  will  come,  not  entirely  from  these  men  with  whom  you  are  going  to  cooperate 
in  these  colleges  and  universities,  in  railroad  service,  but  they  will  have  a  very  large 
representation.  So  you  may  be  sowing  seeds  not  only  for  the  benefits  of  the  properties 
which  you  represent,  and  the  problems  which  you  may  solve  in  transportation,  but 
you  also  may  be  sowing  seeds  of  interest  in  which  you  may  raise  up  the  administrators 
and  workers  of  this  Association  who  will  perpetuate  not  only  the  railroad  as  an  instru- 
mentality of  this  nation  but  will  perpetuate  the  work  of  this  Association  (this  year 
being  its  forty-second  annual  meeting).  If  you  were  to  take  the  poll  now,  you  would 
probably  find  in  this  room  a  very  large  percentage  of  men  who  have  had  the  opportunity 
to  go  to  colleges  and  universities,  and,  therefore,  one  generation  hence  you  will  find 
as  much  a  proportion  of  those  men  coming  from  the  institutions,  who  will  carry  along 
for  us. 

With  that  idea  from  our  committee,  we  therefore  impress  upon  you  and  ask  you 
please  to  review  this  report  with  as  broad  a  viewpoint  as  possible  and  remember  that 
you  may  be  the  only  contact  railroad  to  some  institution  in  this  country,  because  there 
may  not  be  any  other  railroad  close  to  those  universities  and  colleges. 

Chairman  Howson:  That  concludes  the  report  of  this  committee. 

Vice-President  Bond:  Mr.  Howson,  you  and  your  very  able  committee  are  to  be 
warmly  congratulated  on  the  broad  lines  with  which  you  have  begun  the  study  of 
continuing  and  continuous  interest,  and  we  are  all  very  much  indebted. 

It  has  been  brought  to  my  attention  that  there  are  about  25  senior  engineering 
students  who  are  here  largely  through  the  instrumentality  of  the  committee  now  on 
the  platform.  I  think  I  saw  most  of  the  engineering  students  at  lunch  today,  and  they 
are  such  a  good-looking  crowd,  I  am  going  to  ask  them  to  stand  up  so  that  the 
convention  can  also  see  them.  Will  the  junior  members  stand  up?   (Applause) 

The  committee  is  excused  with  the  thanks  of  the  Association.  (Applause) 


Discussion 819 

Discussion  on  Uniform  General  Contract  Forms 

(For  Report,  see  pp.  37  43.) 

(Vice-President  Bond  presiding) 

Chairman  W.  G.  Nusz  (Illinois  Central):  The  committee  cannot  present  its  report 
to  the  Association  this  year  without  reference  to  the  loss  of  our  fellow  committee 
member,  Past-President  James  C.  Irwin.  Mr.  Irwin  served  as  vice  chairman  and  chair- 
man of  this  committee,  as  well  as  a  member  from  its  formation  in  1909  to  the  time  of 
his  death.  March  20,  1940.  The  committee  feels  deeply  the  passing  of  a  wise  counsel, 
always  interested  in  its  work  and  one  who  endeared  himself  to  all  of  its  members.  Both 
the  committee  and  the  Association  have  lost  a  valiant  friend  whom  we  will  miss 
keenly. 

The  first  subject  assigned  to  the  committee  is  Revision  of  Manual.  At  the  request 
of  the  Electrical  Section  of  the  Engineering  Division,  a  subcommittee  of  Committee  20 
has  been  collaborating  with  Committee  1- — Power  Supply  of  the  Electrical  Section  in 
a  comparison  of  the  form  of  our  present  agreement  for  the  purchase  of  electrical 
energy,  now  in  the  Manual,  with  a  tentative  form  drawn  up  by  the  Committee  on 
Power  Supply.  Progress  has  been  made  but  it  is  not  now  deemed  desirable  to  present 
it  to  the  convention.  The  report  will  probably  be  made  on  this  subject  next  year. 

The  second  assignment  is:  Form  of  agreement  for  commercial  signs  on  railway 
property.  Mr.  0.  K.  Morgan,  chairman  of  the  subcommittee,  is  absent,  and  Mr.  E.  H. 
Barnhart  will  present  the  report. 

E.  H.  Barnhart  (Baltimore  and  Ohio):  The  tentative  form  of  this  agreement  was 
submitted  at  the  last  convention  of  the  Association.  All  suggestions  received  have  been 
considered,  and  the  committee  now  presents  for  adoption  the  Form  of  Agreement  for 
Commercial  Signs  on  Railway  Property.  If  there  is  no  objection,  I  will  read  the 
subheadings. 

Mr.  Barnhart:  I  move  the  adoption  of  the  Form  of  Agreement  for  Commercial 
Signs  on  Railway  Property  for  inclusion  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Nusz:  The  third  assignment.  Form  of  lease  for  air-right  development, 
has  been  before  the  committee  a  couple  of  years.  No  report  is  made  at  this  time.  The 
committee  has  given  the  subject  a  great  deal  of  study  and  has  accumulated  a  number 
of  documents  but  it  does  not  seem  advisable  at  this  time  to  present  a  detailed  form  for 
adoption  by  the  Association. 

The  fourth  assignment.  Form  of  agreement  for  wire  or  cable  line  crossings,  collabo- 
rating with  Committee  3 — Overhead  Transmission  Line  and  Catenary  Construction, 
Electrical  Section,  was  made  a  year  ago.  A  form  of  agreement  was  adopted  at  the 
last  convention.  I;  is  reassigned  for  the  purpose  of  considering  revisions  which  may 
be  necessary  in  this  form.  The  committee  has  nothing  to  report  at  this  time  on  this 
assignment.  Since  the  last  annual  convention  we  have  continued  negotiations  with 
the  Rural  Electrification  Authority.  Written  criticisms  have  been  received,  and  a  redraft 
has  been  made  and  is  being  considered. 

The  form  now  under  consideration,  seems  to  be  fairly  satisfactory,  and  it  is  the 
hope  that  it  will  be  completed  in  a  short  time  and  can  be  submitted  to  the  convention 
next  year. 

The  fifth  assignment.  Form  of  agreement  for  unloading  liquelied  petroleum  and 
other  gases,  will  be  presented  by  the  sub-chairman,  Mr.  W.  R.  Swatosh. 

W.  R.  Swatosh  (Erie):  Form  of  agreement  for  unloading  liquefied  petroleum  and 
other  gases  was  prepared  about  a  year  ago  by  a  special  committee  collaborating  with 


820  Water    Service,    Fire    Protection    and    Sanitation 

the  AAR  Bureau  of  Explosives,  and  the  agreement  as  prepared  has  the  approval  of 
the  Law  Department  of  the  AAR  and  the  endorsement  of  the  General  Committee  of 
the  Engineering  Division. 

The  agreement  is  being  presented  for  adoption  in  the  Manual.  If  there  is  no  objec- 
tion, I  will  read  the  various  subheadings. 

(Mr.  Swatosh  then  read  paragraph  headings  one  to  nine.) 

Mr.  Swatosh:   I  move  the  adoption  by  the  Association  for  printing  in  the  Manual. 

(The  motion  was  seconded.) 

W.  L.  Roller  (Chesapeake  &  Ohio) :  Under  the  second  heading.  Ownership  of 
Facilities,  should  there  not  be  some  provision  in  the  form  to  cover  the  ownership  of 
facilities  by  the  unloading  concern? 

Mr.  Swatosh:  That  was  not  included  in  the  assignment.  The  assignment  was  re- 
stricted to  the  preparation  of  an  agreement  to  cover  ownership  of  facilities  by  rail 
companies. 

(Mr.  Swatosh's  motion  was  then  put  to  a  vote  and  carried.) 

Chairman  Nusz:  This  concludes  the  report  of  Committee  20. 

Vice-President  Bond:  The  forms  which  this  committee  painstakingly  composes  from 
year  to  year  and  presents  for  inclusion  in  the  Manual  are  valuable  contributions  in  the 
records  of  our  work.  I  want  to  thank  you,  Mr.  Nusz.  Your  committee  is  now  excused 
with  the  thanks  of  the  Association.  (Applause) 

Discussion  on  Water  Service,  Fire  Protection  and  Sanitation 

(For  Report,  see  pp.  95-106.) 

(Vice-President  Bond  presiding) 

Chairman  B.  W.  DeGeer  (Great  Northern):  The  progress  report  on  Subject  1, 
Revision  of  Manual,  will  be  presented  by  the  chairman  of  the  subcomm'ttee,  Mr. 
E.  M.  Grime. 

E.  M.  Grime  (Northern  Pacific) :  The  committee  has  but  one  small  change  to 
submit. 

(Mr.  Grime  then  read  the  report  on  Assignment  1.) 

Mr.  Grime:   I  move  the  adoption  of  this  change  for  inclu.sion  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  DeGeer:  The  progress  report  on  Subject  2,  Cause  of  and  remedy  for 
pitting  and  corrosion  of  locomotive  boiler  tubes  and  sheets,  with  special  reference  to 
status  of  embrittlement  investigations,  will  be  presented  by  the  chairman  of  the  sub- 
committee, Mr.  R.  E.  Coughlan. 

(R.  E.  Coughlan,  Chicago  &  North  Western,  read  the  first  paragraph  on  assignment 
2,  on  page  96.) 

Mr.  Coughlan:  This  report  of  Dr.  Schroeder  is  directly  in  line  with  the  informa- 
tion obtained  by  your  committee  in  working  with  the  Bureau  of  Mines.  A  brief  abstract 
of  his  paper  shows  that  it  has  now  been  definitely  proven  that  embrittlement  or, 
as  it  is  now  called,  intercrystalline  corrosion,  is  not  produced  in  a  boiler  by  direct 
action  of  the  water  but  by  a  concentrated  solution  formed  from  it  in  capillary  spaces 
in  rivet  seams  in  a  stressed  area. 

There  is  no  doubt,  from  the  results  of  the  studies  up  to  the  present  time,  that  a 
boiler  constructed  to  resist  embrittlement  will  need  no  other  protection  throughout  the 
life  of  such  a  boiler.  Welding  of  seams,  the  use  of  alloy  steels  and  chemical  treatment, 
control  of  water  supplies,  are  the  three  important  items  under  consideration  in  this 
study.  Organic  inhibitors  to  prevent  intercrystalline  corrosion  in  locomotive  boilers  already 
built  have  proven  of  valuable  assistance. 


Discussion  821 


The  evidence  obtained  to  date  from  actual  railroad  operation  indicates  that  a 
combination  of  good  construction  and  shop  practice  greatly  reduces  the  possibility  of 
costly  failures  from  intercrystalline  corrosion  or  cracking. 

This  report  is  offered  in  the  line  of  information. 

Chairman  DeGeer:  Your  committee  has  no  report  on  Subject  3.  Value  of  water 
treatment,  and  4,  Progress  being  made  by  federal  or  state  authorities  on  regulations 
pertaining  to  railway  sanitation. 

The  final  report  on  5,  Cathodic  protection  for  prevention  of  corrosion  of  steel 
tanks,  collaborating  with  the  Electrical  Section,  Engineering  Division,  AAR,  will  be 
presented  by  the  subcommittee  chairman,  Mr.  H.  E.  Silcox. 

H.  E.  Silcox  (Chesapeake  &  Ohio):  In  the  past  few  years  the  subject  of  corrosion 
has  been  widely  discussed  and  various  methods  have  been  tried  to  reduce  the  deteriora- 
tion of  steel  water  tanks.  Many  methods  of  preventing  corrosion  have  been  found 
efficient  in  their  application  to  the  exterior  surfaces,  but  are  not  proving  entirely  satis- 
factory when  applied  to  the  interior  surface  of  the  tank  shell  which  is  subjected  to 
corrosive  action  of  water. 

Cathodic  protection  is  a  recent  development  in  the  control  of  corrosion  on  the 
interior  of  steel  water  tanks.  The  process  is  based  on  the  principle  of  an  electric  cell 
in  which  a  continuous  current  flows  in  one  direction  to  the  steel  tank  shell  which  is 
protected  by  a  hydrogen  film  plated  on  its  surface. 

In  the  application,  direct  electric  current  is  required  to  provide  continuous  current 
flow.  The  supply  is  usually  secured  from  a  regular  105-1 20- volt  electric  lighting  circuit 
which  is  connected  to  a  transformer  and  rectifier  changing  the  power  to  direct  current 
at  8  to  27  volts.  One  or  more  electrodes  of  carbon,  graphite,  stainless  steel  or  other 
metals  are  suspended  inside  the  tank  from  which  the  current  flows  through  the  water 
to  the  tank  shell,  depositing  an  insulating  film  below  the  water  line,  thus  excluding 
oxygen  which  is  a  requisite  of  corrosion.  The  electric  circuit  is  completed  by  a  wire 
connected  to  the  outside  of  the  tank  shell  returning  to  the  rectifier. 

The  cost  of  installed  units  ranges  from  $250  up,  depending  on  area  of  tank,  with 
power  for  operating  from  50  cents  per  month  up. 

With  such  installations,  it  is  still  necessary  to  paint  the  tank  shell  above  the  water 
line,  as  protection  does  not  extend  to  the  surface  area  above  the  water  level.  This 
type  of  installation  has  an  advantage,  in  that  it  is  not  necessary  to  remove  the  tank 
from  service  for  apphcation  of  the  protective  coating,  as  is  required  in  a  cleaning  and 
painting  operation. 

This  report  is  presented  as  information. 

Chairman  DeGeer:  The  final  report  on  Assignment  6,  Effect  of  lubricating  oil 
in  boilers  and  methods  for  correction,  will  be  presented  by  Mr.  R.  M.  Stimmel  in  the 
absence  of  the  subcommittee  chairman,  G.  E.  Durham. 

R.  M.  Stimmel  (New  York,  Chicago  &  St.  Louis) :  Condensed  steam  exhausted 
from  steam  cylinders  usually  contains  lubricating  oil.  Oil  in  the  feedwater  from  this 
source  or  from  industrial  wastes,  and  so  forth,  may  be  detrimental  to  boilers,  depending 
on  the  alkalinity,  dissolved  solids  and  floe  in  the  boiler  water.  Even  slightly  oily  deposits 
on  boiler  heating  surfaces  have  an  insulating  effect  which  reduces  boiler  efficiency.  A 
discontinuous  coating  may  cause  pitting. 

Usually    the    entrance    of    oil    into    boiler    water    can    be    prevented.  In    any    case, 
treatment  of  water  with  suitable  alkalis  and  coagulants  may  be  considered  an  effective 
means  of  correcting  boiler  troubles  due  to  oil. 
The  report  is  submitted  as  information. 


822  Water    Service,    Fire    Protection    and    Sanitation 

Chairman  DeGeer:  The  final  report  on  Assignment  7,  Removal  of  silica  from  boiler 
feedwater,  will  be  presented  by  Mr.  Ray  McBrian,  chairman  of  the  subcommittee. 

Ray  McBrian  (Denver  &  Rio  Grande  Western):  Silica  in  boiler  feed  water,  we 
learn,  is  very  undesirable  since  it  may  form  a  hard,  dense  scale  which  possesses  the 
lowest  of  thermal  conductivities.  Since  the  trend  is  towards  locomotives  with  higher 
pressures  and  to  Diesel  operations,  it  is  necessary  to  keep  the  heating  surfaces  free 
from  this  type  of  scale  formation,  or  else  there  is  great  danger  of  overheating.  It  is 
found  that  there  are  two  fundamental  methods  which  have  been  used  to  prevent  its 
formation. 

1.  The  internal  treatment,  through  suitable  physical  chemical  treatment. 

2.  The  external  treatment,  which  removes  the  silica  before  it  enters  the  boiler. 

The  internal  treatments  have  been  found  to  limit  certain  types  of  silica  scale 
deposits.  The  typical  chemicals  which  are  used  are  sodium  phosphate,  iron  compounds, 
sodium  aluminate,  and  organic  compounds  such  as  starches,  tannins,  lignins,  tannic  acid, 
and  the  glucosides.  The  external  treatment  is  more  needed,  especially  with  increasing 
trends  to  higher  boiler  pressures,  so  as  to  prevent  danger  of  loss  of  heat  conductivity 
by  silica  scale  formation,  and  it  is  therefore  necessary  to  remove  the  silica  before  it 
enters  the  boiler. 

The  methods  discussed  cover  the  use  of  ferric  sulphate,  magnesium  compounds, 
and  aluminum  compounds.  A  description  is  given  of  a  plant  in  operation  on  the 
Atlantic  Coast  Line  at  Savannah,  Ga.,  where  by  using  sodium  aluminate  and  lime  in 
an  especially  designed  plant,  silica  is  satisfactorily  removed.  It  is  noted  that  the  silica 
content  of  the  raw  water  was  3.8  grains  per  gallon,  and  it  was  reduced  to  0.60  grains 
per  gallon  at  a  cost  of  $0.0734  per  1,000  gal.  of  water. 

I  want  to  call  attention  to  an  error  on  page  102,  paragraph  on  Internal  Treatment. 
Line  5  should  read  ....  to  precipitate  it  as  a  non-adherent  sludge  ....  instead  of 
....  as  a  non-adherent  scale. 

This  report  is  presented  as  information. 

Chairman  DeGeer:  The  report  on  Assignment  8,  The  principal  current  activities 
of  the  Fire  Proteciton  and  Insurance  Section,  AAR,  will  be  presented  by  subcommittee 
chairman,  Mr.  G.  F.  Metzdorf. 

(G.  F.  Metzdorf,  New  York,  Chicago  &  St.  Louis,  read  the  first  three  paragraphs 
on  page  106.) 

Mr.  Metzdorf:  There  has  been  a  recent  change  in  the  names  and  duties  of  Com- 
mittees 2  and  3  from  those  shown  in  the  table  on  page  106.  I  will  read  the  correct  names 
of  these  two  committees. 

Committee  2 — Protection 

Committee  3 — Buildings,  Bridges,  Piers  and  Other  Structures 

(a)  Maintenance 

(b)  Operation 

(Mr.  Metzdorf  then  read  the  balance  of  the  report.) 

Chairman  DeGeer:  Your  committee  has  no  report  on  Subject  9,  Use  of  anti- 
foam  compounds  to  reduce  road  blowing,  and  no  report  on  Subject  10,  Specifications 
for  welded  steel  tanks  for  water  service,  collaborating  with  Committee  15 — Iron  and 
Steel  Structures. 

This  completes  the  report  of  Committee  13. 

Vice-President  Bond:  May  I  congratulate  you  and  your  committee  for  a  very 
interesting  report  in  all  its  details.  You  are  now  excused  with  the  thanks  of  the  Associa- 
tion. (Applause) 


Discussion  823 


Discussion  on  Economics  of  Railway  Labor 

(Sec  Report,  see  pp.  213-224.) 

(Vice-President  Bond  presiding) 

Chairman  G.  M.  O'Rourke  (Illinois  Central):  Committee  22— Economics  of  Rail- 
way Labor  reports  on  four  of  the  ten  assigned  subjects.  The  committee  reports  progress 
in  study  for:  5.  Review  and  revise  factors  previously  established  for  equating  track 
values  for  labor  distribution;  6.  Labor  economies  possible  though  the  use  of  highway 
motor  vehicles  for  maintenance  forces;  8.  Labor  economies  resulting  from  periodic  spot 
welding  of  rail  ends  as  compared  with  less  frequent  out-of-facc  welding,  and  9.  Labor 
economies  to  be  derived  from  keeping  vegetation  out  of  ballast. 

Subject  2.  Analysis  of  operation  of  railways  that  have  made  marked  progress  in 
the  reduction  of  labor  required  in  maintenance  of  way  work,  is  one  of  long  standing, 
having  been  reassigned  yearly.  The  report,  to  be  presented  by  Mr.  H.  A.  Cassil,  de- 
scribes the  methods  and  effect  on  the  Central  of  Georgia. 

H.  A.  Cassil  (Pere  Marquette):  The  report  of  the  subcommittee  relates  to  the  so- 
called  "flat  work"  track  maintenance,  particularly  as  practiced  on  the  Central  of 
Georgia  Railway.  It  was  made  as  a  result  of  a  trip  by  a  portion  of  the  committee  over 
that  Hne  last  year.  The  advantages  and  disadvantages  of  the  method  and  the  conditions 
to  which  it  is  adapted  are  discussed.  The  conclusions  stated  in  the  report  are  as  follows: 

(He  read  the  three  conclusions  on  pages  216  and  217.) 

Chairman  O'Rourke:  Subject  3.  The  relative  economy  of  combined  vs.  separate 
l)ridge  and  building  gangs,  was  to  be  presented  by  Mr.  Chumley  who  was  detained  in 
the  South  by  the  beginning  of  the  construction  of  one  of  the  large  defense  projects.  The 
subject  will  be  presented  by  Mr.  Vance.  The  report  he  will  place  before  the  conven- 
tion has  been  prepared  after  several  years  of  investigation  and  study  on  most  of  the 
railroads  of  the  country  and  does,  we  beheve,  represent  the  best  practice.  Careful 
consideration  of  the  conclusions  offered  for  inclusion  in  the  Manual  will  be  appreciated. 

W.  H.  Vance  (Missouri  Pacific) :  As  Mr.  O'Rourke  stated,  this  subject  has  been 
under  consideration  for  quite  some  time.  In  order  to  determine  the  prevailing  practice, 
the  committee  sent  a  questionnaire  to  representative  railroads  throughout  the  United 
States  and  Canada.  Thirty-eight  of  the  railroads  replied,  furnishing  valuable  informa- 
tion on  this  subject.  These  38  roads  of  a  combined  mileage  of  approximately  232,202, 
with  3,303  miles  of  steel  and  masonry  bridges,  1,500  miles  of  timber  bridges,  with  ap- 
proximately 80  percent  of  the  buildings  and  miscellaneous  structures  of  wood.  Twenty- 
seven  of  these  roads,  with  85  percent  of  the  total  mileage,  95  percent  of  the  steel  and 
masonry  bridges,  and  80  percent  of  the  timber  bridges,  use  combined  gangs.  Eleven 
roads,  with  15  percent  of  the  total  mileage,  5  percent  of  the  steel  and  masonry  bridges, 
and  20  percent  of  the  timber  bridges,  use  so-called  separate  gangs. 

The  various  railroad  maintenance  officers  set  forth  the  advantages  and  disadvantages 
of  the  so-called  separate  gangs.  The  committee  considered  all  these  replies  and  came 
to  the  following  conclusion: 

The  relative  economy  of  combined  or  separate  gangs  for  bridge  and  building  work 
depends  upon  the  conditions  prevailing  on  individual  railroads  and,  in  many  cases,  on 
grand  divisions  or  districts  of  a  single  railroad.  For  railroads  in  general,  with  half  or 
more  of  their  bridges  of  timber  construction  and  with  a  large  proportion  of  their 
buildings  of  frame  tonstruclion,  combiiuil  gangs  are  jjreferable  to  separate  gangs. 
We  have  undertaken  to  define  combined  gangs  and  separate  gangs. 
(He  read  the  definitions  on  page  218.) 


824 Economics   of    Railway   Labor 

Mr.  Vance:  I  neglected  to  say  a  moment  ago  that  nearly  all  of  the  railroads  of 
any  size  do  have  special  gangs  for  their  steel  bridge  work,  and  this  report  has  to  do 
with  the  ordinary  maintenance  work  rather  than  the  heavy  steel  work. 

The  committee  recommends  that  the  conclusions  be  adopted  and  published  in 
Chapter  22  of  the  Manual,  following  the  matter  on  programming  of  bridge  and  building 
work,  and  that  the  definitions  be  adopted  and  published  in  the  Glossary. 

I  move  the  adoption  of  this  material. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  O'Rourke:  Subject  7.  Added  labor  economics  resulting  from  use  of 
off-track  maintenance  equipment:  The  report  to  be  presented  by  Mr.  Armstrong  Chinn 
is  the  result  of  two  years'  study  and  contains  the  most  complete  information  on  the 
subject  available  today.  It  is  of  growing  importance  and  warrants  the  serious  consid- 
eration of  every  maintenance  of  way  officer. 

Armstrong  Chinn  (Alton) :  The  gist  of  the  report  will  be  found  in  the  list  of 
factors  at  the  top  of  page  222  which,  in  the  opinion  of  the  committee,  have  brought 
about  the  development  and  use  of  off-track  equipment,  and  the  list  of  economies  found 
at  the  bottom  of  page  223  which  the  committee  believes  will  result  from  the  use  of 
off-track  equipment.  I  will  read  these  two  portions  of  the  report. 

(Mr.  Chinn  read  the  first  paragraph,  including  subhead  paragraphs,  on  page  222, 
and  the  possible  labor  economies  listed  at  the  bottom  of  page  223  and  concluding  on 
page  224.) 

Mr.  Chinn:  The  report  is  submitted  as  information. 

Chairman  O'Rourke:  I  unintentionally  skipped  over  the  report  of  a  very  im- 
portant subject,  Assignment  4.  Labor  economies  resulting  from  improvements  in  drain- 
age practices.  This  assignment,  recently  given  to  the  Committee  on  Economics  of 
Railway  Labor,  has  been  handled  from  a  different  point  of  study  by  the  Roadway 
committee  in  the  past,  and  perhaps  by  others.  We  have  given  consideration  to  the  labor 
economies  resulting  from  sub-surface  drainage.  The  report  will  be  submitted  by  Mr. 
E.   H.   Mcllheran. 

E.  H.  Mcllheran  (St.  Louis  Southwestern):  The  first  part  of  this  report  of  the 
subcommittee  on  this  subject  states  that  many  reports  have  previously  been  made 
indicating  the  necessity  for  good  drainage  and  the  benefits  to  be  derived  therefrom, 
and  shows  in  what  volumes  of  the  Association  Proceedings  some  of  this  information 
may  be  found. 

Questionnaires  were  sent  to  52  railroads  to  ascertain  if  possible  the  monetary 
savings  in  labor  resulting  from  improvements  in  drainage  practices.  The  figures  received 
from  the  20  railroads  that  furnished  any  costs  were  consolidated  and  are  tabulated 
on  the  bottom  of  page  219.  They  show  that  a  very  substantial  saving  in  labor  has 
been  secured  by  installations  of  the  several  types  of  drainage. 

At  the  top  of  page  220  there  is  a  description  of  tile  drain  installed  in  1920,  accordmg 
to  AREA  recommended  practice,  on  the  St.  Louis  Southwestern  Railway  a  short 
distance  south  of  Pine  Bluff,  Ark.,  where  8,349  ft.  of  track  was  drained  at  a  cost  of 
$15,162,  which  resulted  in  an  estimated  annual  saving  in  track  labor  of  about  $2,620 
and  improved  the  track,  on  which  permanent  slow  orders  of  10  or  IS  miles  per  hour 
had  been  maintained,  so  that  trains  could  be  safely  operated  at  a  speed  of  60  miles 
per  hour. 

On  the  lower  part  of  page  220  there  is  described  a  perforated  corrugated  metal 
pipe  drain  installation  on  the  Illinois  Centml  Railroad  on  the  Bluford  district  near 
Fulton,   Ky.,   where   4,000   ft.   of   S-in.   perforated   corrugated   asphalt-coated   iron   pipe 


Discussion 825 

was  installed  at  a  cost  of  about  $13,000  in  a  sliding  fill  to  drain  water  pockets,  and 
which  work  has  apparently  stabilized  the  fill,  resulting  in  an  estimated  annual  saving 
of  about  $2,250,  and  the  removal  of  a  466-ft.  temporary  trestle  which  had  been 
maintained  for  years  because  of  the  unstable  fill. 

(Mr.  Mcllheran  then  read  the  conclusion  on  page  221.) 

Chairman  O'Rourke:  Your  committee  desires  to  offer  as  information  a  special 
report  on  the  studies  of  the  subcommittee  headed  up  by  the  late  Robert  Faries.  The 
carriers'  Special  Committee  on  Mechanization  in  the  Maintenance  of  Way  Department 
presented  testimony  before  the  Railroad  Carrier  Industry  Committee  in  Washington 
a  year  ago.  The  report  shows  in  detail  how  advances  in  hourly  rates  accelerate  the 
mechanization  of  labor  operations  in  maintenance  of  way.  Mr.  F.  S.  Schwinn  was  a 
member  of  that  subcommittee  and  will  present  the  report. 

F.  S.  Schwinn  (Missouri  Pacific  Lines):  This  report  appears  on  pages  1  to  25 
inclusive  of  Bulletin  419  (pages  1  to  25  of  the  monograph  section  of  the  Proceedings). 
Your  attention  is  directed  to  an  error  in  the  sub-title  as  the  basis  of  the  report  was 
testimony  presented  before  the  Railroad  Carrier  Industry  Committee  and  not  by  that 
committee.  The  testimony  was  presented  by  the  late  Robert  Faries  of  Pennsylvania 
and  was  the  result  of  exhaustive  studies  of  the  effects  of  mechanization  in  maintenance 
of  way  departments  of  railroads.  I  was  privileged  to  have  the  opportunity  of  being 
associated  with  Mr.  Faries  when  he  made  these  studies,  and  I  therefore  greatly 
appreciate  this  opportunity  of  placing  this  information  before  the  convention. 

Your  committee  feels  that  the  report  contains  a  large  amount  of  valuable  data 
in  a  concise  form,  and  that  such  data  should  be  of  material  assistance  in  meeting 
present  day  conditions  and  traffic  demands.  It  reflects  one  of  the  many  outstanding 
efforts  of  Mr.  Faries  in  behalf  of  the  railroad  industry. 

Chairman  O'Rourke:  A  revision  of  the  Manual  was  given  due  consideration, 
and  no  revision  was  recommended.  That  concludes  the  report  of  Committee  22. 

A.  A.  Miller  (Missouri  Pacific) :  I  would  like  to  say  before  the  committee  is 
excused  that,  in  my  opinion,  the  work  that  this  committee  is  doing  is  of  such  importance, 
particularly  at  this  time  and  possibly  in  the  future,  that  any  assistance  that  we  can 
give  the  members  in  the  way  of  suggestions  or  information  during  the  year,  I  am  sure 
the  chairman  and  members  of  the  committee  would  welcome. 

To  those  who  have  not  as  yet  read  the  information  and  suggestions  and  recom- 
mendations made  in  the  bulletins  covering  this  committee's  work,  I  suggest  that  it 
would  be  well  to  do  so.  There  is  one  part  of  the  committee's  work  that  we  on  the 
Missouri  Pacific  have  come  in  contact  with  strongly.  That  feature  is  the  so-called 
"flat  work"  which  has  been  referred  to  here  and  covered  in  a  brief  report.  Several 
years  ago  that  thought  came  out  of  the  South,  from  the  Central  of  Georgia.  It  didn't 
appeal  to  me  at  all  at  the  time,  but  we  took  it  on.  This  kind  of  work  is  surely  effectively 
applicable  to  the  so-called  light  traffic  lines,  Hght  rail  lines,  or  branch  lines  of  doubtful 
future. 

We  undertook  some  of  this  work  in  a  test  sort  of  way  five  or  six  years  ago  on 
the  Missouri  Pacific  Railroad,  and  it  has  grown  and  grown  so  that  now  we  have 
set  it  up  as  program  work.  I  should  say  that  our  light  traffic  lines  or  lines  of  doubtful 
future  (light  rail  lines),  are  now  50  percent  covered  by  the  flat  work  process.  It  is 
what  might  be  called  line  and  surface  work  without  the  use  of  very  much,  if  any, 
ballast,  and  is  done  primarily  by  section  forces  and  not  by  extra  gangs.  It  gives  some 
measure  of  the  work  being  done  in  application  of  man-hours  out  on  these  light  traffic 
lines  where,  as  supervisory   officers,  we  well  know  wc  don't   get   very   often.  Wc   have 


826  Maintenance    of   Way    Work    Equipment     

been  more  or  less  dependent  upon  asking  questions  and  getting  answers,  accepting  them 
but  sometimes  doubting  them  with  respect  to  conditions  on  such  lines.  But  now  we 
can  really  have  a  measure  of  the  application  of  those  man-hours.  It  would  be  well  in 
my  opinion  for  those  who  have  that  kind  of  branch  lines  to  look  after,  to  read  the 
report  of  this  committee  with  reference  to  the  so-called  "flat  work". 

Vice-President  Bond:  This  committee  is  to  be  congratulated  on  its  very  fine  work, 
and  is  now  excused  with  the  thanks  of  the  Association. 


Discussion  on  Maintenance  o£  Way  Work  Equipment 

(For  Report,  sec  pp.  173-212.) 

(Vice-President  Bond  presiding) 

Chairman  G.  R.  Westcott  (Missouri  Pacific):  Counting  one  subject  that  is  divided 
and  the  assignment  of  Revision  of  the  Manual,  Committee  27  had  14  assigned  subjects. 
We  are  reporting  on  seven  of  them.  Of  the  subjects  on  which  there  is  no  report,  I 
mention  Revision  of  the  Manual,  but  we  are  reporting  on  one  small  item  of  Manual 
revision  in  connection  with  one  of  the  other  subjects. 

Assignment  No.  3  is  Lubrication.  The  report  is  under  way  but  not  ready  for  this 
year.  No.  4  is:  Self-contained  direct-blow  gasoline  tampers.  Owing  to  lack  of  develop- 
ments in  that  line  we  have  not  found  anything  warranting  a  report,  but  anticipate 
developments  worthy  of  report  next  year. 

The  other  four  are  as  follows: 

No.  9  (a)  Oxy-acetylene  welding:  Some  progress  was  made  on  this  but  no  definite 
results  were  obtained  this  year.  No.  10  is:  Automotive  equipment  used  on  the  rail- 
roads. That  is  a  subject  that  is  developing  very  rapidly,  and  I  think  next  year  we 
shall  have  a  report.  No.  12  is:  Weed  burners  and  extinguisher  cars,  and  No.  13  is: 
Safety  devices  for  work  equipment.  That  disposes  of  one-half  of  our  assignments. 

On  the  other  seven  subjects  we  are  presenting  reports,  beginning  with  subject 
No.  2,  Standardization  of  parts  and  accessories  for  railway  maintenance  motor  cars. 
I  will  ask  Mr.  R.  K.  Johnson  to  present  the  report. 

(R.  K.  Johnson,  Chesapeake  &  Ohio,  read  the  report  on  Assignment  2,  page  174.) 

Mr.  Johnson:  I  move  that  Fig.  S. — Safety  Rails  for  Light  Inspection  Motor  Car, 
shown  on  page  176,  be  adopted  and  pubhshed  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Westcott:  The  next  assignment  on  which  we  have  a  report  is  No.  S, 
Devices  for  applying  metal  preservatives  to  rail  and  fastenings.  I  will  ask  Mr.  Fero 
to  present  the  report  in  the  absence  of  Mr.  R.  R.  Smith,  who  is  chairman  of  the 
subcommittee. 

C.  L.  Fero  (Boston  &  Maine) :  This  is  a  rather  long  report,  and  I  will  just  skim 
over  it.  You  all  know  the  general  causes  of  corrosion  to  rail  and  track  fastenings,  so  I 
will  skip  that. 

The  prevention  or  control  of  corrosion  is  achieved  by  the  simple  expedient  of 
placing  a  protective  coating  on  the  surface  of  the  metal.  The  most  commonly  employed 
material  is  an  asphalt  base  oil  usually  containing  45  to  S5  percent  asphalt. 

Hand  application  consists  of  brushing  or  painting,  the  use  of  hand  operated  one- 
man  sprayers,  and  the  application  of  joint  packing. 

(Mr.  Fero  then  read,  beginning  with  the  second  paragraph  under  Hand  Operated 
Appliances  on  page  177  and  ending  with  the  tenth  line  on  page  180.) 


Discussion ^ 827 

Mr.  Fero:  There  is  available  through  a  manufacturer  a  self-propelled  track  oiler 
of  rather  large  capacity  designed  to  accomplish  all  of  the  oiling  on  track  or  roadway. 
The  machine,  consisting  of  two  units,  the  track  oiler  and  the  trailer  tank  car,  is  powered 
with  a  72-hp.  gasoline  motor  for  propulsion  and  the  operation  of  all  the  mechanical 
equipment,  such  as  the  air  pump,  oil  pumps,  etc. 

(Mr.  Fero  then  read  the  six  paragraphs  beginning  at  the  top  of  page  183.) 

H.  Austin  (Terminal  Railroad  Association  of  St.  Louis) :  I  would  regret  very 
much  to  see  this  subject  dropped  by  the  committee.  The  damage  to  track  by  brine 
drippings  is  enormous  in  this  country.  This  subject  is  very  closely  related  to  that  ques- 
tion. I  believe  it  should  be  continued,  and  the  committee  should  keep  up  with  progress 
in  the  hope  of  developing  some  methods  of  combating  the  damage  caused  by  brine  to 
rail  bases,  spikeheads,  tie  plates  and  ground  switches. 

It  may  interest  the  committee  that  I  built  a  little  outfit  for  spraying  the  outside 
of  the  track  rail,  spikeheads  and  tie  plates  with  regular  paint  spray  equipment,  using 
a  45  percent  asphalt  oil.  I  think  you  get  much  better  diffusion,  much  better  protection, 
than  you  do  by  simply  applying  the  oil  under  pressure.  It  is  hauled  by  standard  motor 
cars,  covering  about  12  miles  of  track  a  day.  The  spray  guns  are  detachable,  so  that 
with  sufficient  hose  one  can  stop  at  switches  and  turnouts  in  yards  to  spray  them  with 
the  gun,  hook  it  up  again  and  go  on  down  the  track. 

I  will  be  glad  to  furnish  the  committee  a  plan  of  that  outfit. 

Vice-President  Bond:  The  suggestion  that  this  subject  be  discontinued  will  be  duly 
dealt  with  by  the  Committee  on  Outline  of  Work. 

Chairman  Westcott:  May  I  make  a  remark  about  that  particular  thing.  This 
committee  is  unique  in  this  respect:  Our  function  is  to  discuss  those  things  that  are 
available  for  a  given  purpose.  We  are  not  permitted  to  discuss  their  economic  features, 
particularly.  We  can  tell  what  they  are  and  what  they  do  and  what  we  hope  to  get 
from  them,  but  we  do  not  design  them.  We  did  not  know  about  Mr.  Austin's  paint 
sprayer;  we  are  glad  to  know  about  it.  But  it  seemed  to  the  committee  in  this  par- 
ticular instance  that  we  had  covered  the  ground,  as  the  situation  now  stands,  pretty 
thoroughly,  and  that  it  would  perhaps  be  better  to  discontinue  the  subject  for  a  year 
or  two  until  someone  had  devised  something  better  than  what  we  now  have.  That  is 
not  in  the  way  of  argument  at  all  but  just  an  explanation  as  to  the  view  of  the 
committee. 

Subject  No.  6  on  this  assignment  is  Methods  of  keeping  data  on  work  equipment. 
This  subject  has  been  before  the  committee  quite  a  number  of  years.  In  the  last  two 
or  three  years  we  have  tried  to  clear  it  up,  and  we  hope  this  year  we  have  cleared 
it  up.  Mr.  N.  W.  Hutchison  will  present  the  report. 

N.  W.  Hutchison  (Chesapeake  &  Ohio):  Although  there  are  probably  as  many 
methods  of  keeping  data  on  work  equipment  as  there  are  railroads,  it  is  generally  agreed 
that  data  of  some  description  should  be  secured  for  the  following  purposes,  regardless 
of  the  methods  followed: 

(He  read  items  1  to  8  on  pages  183  and  184.) 

Mr.  Hutchison:  Study  of  the  assigned  subject  thoroughly  indicates  that  standardiza- 
tion of  methods  for  keeping  data  on  work  equipment  is  difficult,  if  not  impossible. 
Standardization  of  forms  for  the  purpose,  however,  is  not  only  practical  but  desirable. 
With  this  in  mind,  your  committee  has  submitted  a  series  of  illustrative  forms  which 
we  believe,  while  not  specifically  adaptable  in  each  case,  will  provide  for  better  control 
of  work  equipment. 


828 Maintenance   of   Way   Work   Equipment 

These  forms,  the  use  of  which  is  briefly  described  and  on  which  illustrative  but 
fictitious  data  are  inserted,  are  shown  on  pages  185  to  194,  inclusive.  This  report  is 
presented  as  information,  with  the  recommendation  that  the  subject  be  discontinued. 

Chairman  Westcott:  Assignment  7  is:  Pneumatic  tired  tractor  equipment.  Mr.  R.  M. 
Leeds  will  present  the  report. 

R.  M.  Leeds  (Louisville  &  Nashville) :  The  report  of  your  subcommittee  outhnes 
the  uses  of  pneumatic  tired  equipment  as  applied  to  the  railroads,  the  reasons  therefor 
and  the  needs  for  further  development.  Concerted  action  by  the  railroads  and  manu- 
facturers is  suggested  in  order  to  develop  more  units  suitable  for  railroad  service. 

The  committee  did  not  confine  itself  entirely  to  tractors,  as  will  be  shown  by  some 
of  the  illustrations  in  the  report,  as  it  was  thought  that  it  would  be  well  to  show  some 
more  of  the  diversified  uses  to  which  pneumatic  tired  equipment  could  be  put.  Continua- 
tion of  the  subject  is  recommended  by  the  committee. 

Chairman  Westcott:  Assignment  8  is:  Impact  wrenches,  something  that  we  all  have 
heard  of  and,  I  guess  as  a  general  rule,  do  not  know  very  much  about.  Mr.  R.  A. 
Morrison  will  present  the  report. 

Mr.  R.  A.  Morrison  (Pere  Marquette):  This  report  is  a  simple  description  of  two 
types  of  wrenches  that  are  now  on  the  market  and  in  use  by  the  maintenance  of  way 
department.  One  is  the  spring  and  cam  type  and  the  other  is  a  power  vane  wrench. 
One  type  is  shown  on  page  199,  and  the  other  on  page  200.  I  might  add  that  this 
impact  wrench  is  used  more  extensively  by  the  mechanical  department  in  the  repairs 
of  locomotives  and  cars  than  possibly  in  the  maintenance  of  way  department.  Any  one 
who  has  not  seen  them  in  operation  or  who  is  not  familiar  with  them  can  get  good 
information  on  their  operation  and  use  if  he  will  investigate  the  repair  shops  of  his 
road.  The  mechanical  departments  use  a  much  larger  wrench  than  we  do.  It  was 
possibly  because  of  the  use  and  development  of  this  larger  wrench  that  enough  progress 
was  made  to  bring  forth  a  much  lighter  tool  for  the  maintenance  department.  The  big 
improvement  in  the  modern  wrench  is  the  small  recoil  action  that  permits  its  use  in 
overhead  work,  with  less  scaffolding. 

This  report  is  submitted  as  information,  and  it  is  recommended  that  the  subject  be 
discontinued. 

Chairman  Westcott:  For  several  years  we  have  had  assigned  to  us  the  subject  of 
equipment  for  track  welding,  both  oxy-acetylene  and  arc  welding.  This  year,  on  the 
second  half  of  that  assignment,  which  is  No.  9  (b),  Mr.  Morgan,  chairman  of  the 
subcommittee,  will  present  a  discussion  of  mountings  for  arc  welding  machines. 

C.  E.  Morgan  (Chicago,  Milwaukee,  St.  Paul  &  Pacific) :  The  report  this  year  on 
arc  welding  equipment  is  confined  strictly  to  the  mounting  of  machines  for  mainte- 
nance work.  We  have  not  tried  to  cover  in  any  way  a  description  of  the  process  or 
how  the  arc  welding  work  is  done.  Because  of  interest  in  the  manner  in  which  arc 
welding  machines  may  be  adapted  to  suit  the  users'  purpose,  illustrations  of  each  of 
many  types  in  use  today  are  presented  in  the  hope  that  they  may  help  someone  to 
solve  his  particular  problem.  Believing  we  can  learn  a  little  faster  through  using  pictures 
than  by  reading  detailed  information,  we  have  included  practically  every  kind  of  a 
mounting  in  which  an  arc  welding  machine  is  used  either  in  smaller  or  in  more 
extensive  numbers.  There  are  a  few  of  these  which  are  quite  rare  but  which  are  so 
effective  in  their  application  that  we  feel  our  responsibility  in  calling  them  to  your 
attention. 

On  page  201,  Fig.  1  shows  the  standard  skid-mounted  machine  which  has  been 
placed  on  track  wheels,  so  that  it  may  be  moved  readily  from  one  place  to  another. 


Discussion 829 

Fig.  2  shows  a  truck-mounted  welding  generator,  in  which  the  welding  machine  gets 
the  power  from  the  truck  engine  through  a  power  take-off. 

At  the  bottom  of  page  201,  Fig.  3,  is  the  pneumatic-tired  wheel-mounted  machine, 
the  one  that  we  would  ordinarily  speak  of  as  almost  universal  among  the  various  con- 
tractors in  building  work,  and  in  a  great  many  cases  in  bridge  repair  and  work  that 
requires  it  to  be  towed  around  by  trucks. 

On  page  202,  Figs.  4  and  5  show  two  views  of  a  machine.  Fig.  4  showing  it  on 
the  track,  and  Fig.  5,  the  same  machine,  after  it  has  been  moved  to  the  position  over 
the  shoulder  where  it  clears  the  track. 

On  page  203,  Fig.  6,  illustrates  an  ingenious  arrangement  whereby  a  machine, 
which  can  be  towed  around  on  pneumatic  wheels,  may  also  be  placed  on  an  under- 
slung  push  car  for  movement  on  tracks.  Fig.  7  shows  the  push  car  with  the  apron  down, 
to  illustrate  how  this  machine  is  quickly  loaded  for  moving. 

Fig.  8  illustrates  a  means  for  meeting  the  problem  of  traffic  density  that  does  not 
permit  machines  to  occupy  the  track  at  any  time,  in  which  case  the  welding  machine 
must  remain  in  the  ditch  or  along  the  bank.  Here  we  have  a  crawler  mounted  machine 
that  is  made  narrow  for  this  purpose.  The  end  view  is  illustrated  in  Fig.  9. 

Turning  to  page  204,  we  recognize  the  front  end  of  a  crawler  tractor.  Crawler 
tractors  have  been  used  quite  extensively  in  handling  arc  welding  work  where  either  a 
small  tractor  with  one  arc  mounted  on  it,  or  the  larger  machine  with  two  arcs  on  it, 
is  employed.  These  units,  of  course,  are  self-propelling  off  the  track,  and  the  only 
place  where  it  is  necessary  for  them  to  occupy  the  track  is  where  they  cross  bridges  or 
trestles. 

Fig.  11  shows  another  mounting  with  which  a  machine  can  be  operated  on  the 
track  and  which  also  embodies  a  series  of  telescoping  pipes  to  connect  to  a  stand 
with  adjustable  legs  which  are  set  up  as  shown  in  Fig.  12  for  moving  the  machine 
horizontally  into  the  clear.  Fig.  13  shows  the  same  machine  in  its  place  out  on  the 
ballast  shoulder. 

It  is  contended  by  many  that  the  use  to  which  welding  is  put  in  the  maintenance 
work  depends  on  the  mobility  of  the  equipment  associated  with  it.  To  this  end,  the 
mountings  described  have  been  designed  for  a  broad  field  of  application. 

This  report  is  submitted  as  information,  and  it  is  recommended  that  the  subject 
be  discontinued. 

Vice-President  Bond:  I  agree  with  Mr.  Morgan  that  these  photographs  are  very 
helpful  in  explaining  the  subject  of  his  paper.  A  great  deal  depends  upon  the  clarity 
of  the  photographs,  and  on  some  of  them  the  subcommittee  is  to  be  commended — 
I  am  afraid  I  can  only  say  on  some — but  they  are  very  helpful.  It  is  a  very  complete 
report.  I  don't  think  the  subject  can  be  considered  as  concluded. 

Chairman  Westcott:  One  other  assignment.  No.  11,  on  our  docket  is:  Off-track 
grading  equipment.  Mr.  A.  J.  Neff  will  present  the  report. 

A.  J.  Neff  (Denver  &  Rio  Grande  Western):  The  present  tendency  of  railroads 
to  replace  expensive  on-track  equipment  with  the  latest  off-track  machines  indicates 
that  greater  advantages  are  being  found  in  the  use  of  crawler  machines. 

In  this  report  are  illustrated  crawler  tractors  with  various  types  of  blade,  front- 
end  loaders,  carryalls,  scrapers,  shovels  and  draglines.  Mention  is  made  of  the  different 
types  of  work  they  can  perform.  Three  examples  of  typical  application  of  this  type  of 
equipment  are  also  given. 

Members  engaged  on  this  assignment  have  concluded  that  the  use  of  off-track 
grading  equipment  will  expedite  work,  minimize  traffic  delays,  perform  work  impossible 
to  perform  with  on-track  equipment,  and  effect  gratifying  returns  on  investment  costs. 


8.^0  Wood    Preservation 


This  report  has  been  prrscntod  as  information,  and  it  is  recommended  that  the 
subject  be  discontinued. 

Chairman  Westcott:  I  was  a  bit  surprised  that  our  president  did  not  call  attention 
to  the  fact  that  we  also  requested  this  assignment  be  discontinued.  I  would  like  to 
make  one  other  comment  on  this  feature.  Committee  27  is  made  up  of  men  who  are 
good  soldiers.  If  the  Committee  on  Outline  of  Work  says  we  shall  continue  a  subject, 
we  will  do  the  best  we  can  with  what  material  is  available.  If  they  see  eye  to  eye 
with  us  that,  for  the  present  at  least,  there  is  not  available  material  on  which  to  work 
and  for  a  year  or  so  discontinue  the  subject,  we  will  be  gratified.  In  either  case,  we  will 
do  the  best  that  we  can. 

This  concludes  the  report  of  Committee  27. 

Vice-President  Bond:  We  are  very  much  obliged  to  you  for  the  very  able  and 
extensive  series  of  reports  which  you  submitted,  and  your  committee  is  relieved  with 
the  thanks  of  the  Association  for  your  very  valuable  work  and  contribution.  (Applause) 


Discussion  on  Wood  Preservation 

(For  Report,  see  pp.  489-514.) 

(Vice-President  Bond  presiding) 

Chairman  H.  R.  Duncan  (Chicago,  Burlington  &  Quincy):  The  subcommittees 
assigned  to  Subjects  1,  4,  6,  7,  8  and  9  have  made  considerable  progress  and  study 
of  their  subjects  during  the  past  year  but  have  no  reports  completed  to  present  at 
this  time. 

Subject  2,  Service  test  records  for  treated  ties,  is  the  usual  progress  report  of  tests 
on  various  railroads,  revised  to  include  the  latest  available  figures  on  five  roads.  The 
report  also  includes  special  reports  on  test  tracks  on  a  number  of  railroads.  Each  year 
this  particular  committee  report  becomes  of  more  and  more  value.  It  gives  definite 
records  on  what  life  is  being  secured  throughout  the  country  where  traffic  and  climatic 
conditions  are  different  and  where  various  species  and  methods  of  wood  preservation 
or  wood  preservatives  have  been  used.  The  report  is  submitted  as  information. 

Subject  3,  Piling  used  for  marine  construction,  covers  the  inspection  of  long-time 
test  pieces  of  piUng  in  the  Canal  Zone  and  other  localities  under  observation.  For  a 
number  of  years  Colonel  Atwood  has  served  as  chairman  of  this  subcommittee  and, 
due  to  his  intimate  contact  with  work  of  this  character  and  close  association  with 
various  army  and  navy  officers  carrying  on  research  work  of  this  kind,  he  has  been 
able  to  bring  to  this  Association  a  considerable  amount  of  data  that,  in  our  opinion, 
are  most  valuable. 

Colonel  Atwood  has  recently  advised  us  that  he  has  resigned  from  the  Association, 
and  a  new  chairman  will  be  assigned  to  this  subcommittee,  but  he  has  also  assured 
us  that,  although  he  will  no  longer  be  a  member  of  our  Association,  he  will  continue 
to  work  with  the  committee,  and  we  will  be  able  to  maintain  a  contract  with  the  army 
and  navy  as  we  have  heretofore.  This  will  insure  that  we  will  secure  further  reports  of 
the  same  character. 

The  report  is  submitted  as  information. 

Subject  5,  Destruction  by  termites  and  possible  ways  of  prevention:  This  report 
will  be  submitted  by  the  subcommittee  chairman,  Dr.  von  Schrenk. 

Hermann  von  Schrenk  (St.  Louis,  Mo.):  This  committee  has  little  to  report.  The 
information  in   the  report  is  all  we  have  this  year.  The  main   thing  about  the  termite 


Discussion 831 

situation  is  that  it  is  worse  instead  of  getting  better.  While  I  am  not  an  alarmist, 
it  seems  to  me  they  are  rapidly  getting  the  best  of  the  human  race. 

I  was  in  Texas  for  a  little  while  and  had  a  very  interesting  visit  to  several  of 
the  new  army  posts  that  are  being  constructed  there,  involving  hundreds  and  hundreds 
of  new  buildings.  I  was  very  much  interested  to  note  with  what  great  efficiency  the 
U.  S.  Engineer  Corps  and  the  Architectural  Department  of  the  army  are  following  the 
specifications  which  have  been  drawn  up  and  which  our  Association  has  in  the  Manual 
for  the  prevention  of  termites,  particularly  the  shield  construction. 

If  there  is  one  thing  we  are  emphasizing  this  year  it  is  that,  wherever  buildings 
are  put  up,  shield  construction  be  used,  and  that  you  not  be  scared  off  by  all  sorts 
of  reports,  which  are  increasing  in  number  from  time  to  time  that  the  shields  are  no 
good.  Several  cases  have  been  reported  in  which  it  was  claimed  the  shields  did  not 
work.  The  reasons  were  obvious  because  the  joints  were  not  soldered;  they  weren't 
gripped,  so  the  termites  could  readily  get  in  behind  the  adjoining  ends. 

Chairman  Duncan:  One  of  the  interesting  characteristics  of  the  Doctor  is  that 
he  doesn't  have  any  report  but  he  continues  to  bring  us  new  and  valuable  information 
each  time  he  is  on  the  floor. 

That  concludes  our  report. 

Vice-President  Bond:  We  thank  Mr.  Duncan  for  his  very  good  report  and  for 
the  able  assistance  which  he  has  had  from  his  committee.  You  are  now  excused  with 
the  thanks  of  the  Association.   (Applause) 

Discussion  on  Roadway  and  Ballast 

(For  Report,  see  pp.  S39-S74.) 

(Vice-President  Bond  presiding) 

Chairman  A.  E.  Botts  (Chesapeake  &  Ohio):  We  have  11  subjects  subdivided 
into  23  assignments,  of  which  we  are  reporting  on  14.  Our  first  assignment,  Physical 
properties  of  earth  materials  will  be  held  for  presentation  between  four  and  five 
o'clock,  at  which  time  Mr.  Herbert  Ensz,  in  the  absence  of  Mr.  Legro,  the  chairman, 
will  present  the  subject,  and  he  has  a  few  slides  he  will  use  in  connection  therewith.* 

Our  second  assignment.  Size  of  waterway  openings,  formulas,  will  be  presented  by 
Mr.  Rose,  chairman  of  the  subcommittee. 

L.  S.  Rose  (Erie) :  With  the  exception  of  two  corrections  in  the  formulas  found 
on  page  544,  which  were  called  to  your  attention  at  the  last  convention  and  a  few 
minor  changes  made  since,  this  report  is  the  same  as  that  submitted  a  year  ago  as  infor- 
mation. It  is  now  submitted  for  publication  in  the  Manual.  As  the  report  is  not 
subdivided  under  headings,  unless  there  are  objections,  I  shall  read  only  the  conclusion 
found  on  page  546. 

(He  read  the  five  lines  under  the  heading  Conclusions.) 

Mr.  Rose:  This  report  is  now  offered  for  publication  in  the  Manual,  and  I  so  move. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Botts:  Our  third  and  fourth  assignments.  Specifications  for  vitrified  clay 
culverts  and  Specifications  for  pipe  line  crossings  carrying  non-inflammable  substances 
under  pressure,  will  be  presented  by  Mr.  Swartout,  chairman  of  the  subcommittee. 

W.  C.  Swartout  (Missouri  Pacific) :  As  you  recall,  last  year  we  presented  as  infor- 
mation  a   complete   specification    for   triple   strength   clay   culvert   pipe   as   distinguished 


•  At  the  close  of   the  afternoon   session,   Mr.   Ensz  gave  a  30-min.   talk  on   various  phases  of  soil 
mechanics  which  he  illustrated  with  lantern  slides.  His  remarks  were  received  without  comment. 


832         Roadway    and   Ballast 

from  sewer  pipe.  It  was  with  the  firm  expectation  that  this  year  we  would  offer  that 
specification  for  publication  and  inclusion  in  the  Manual,  but  we  regret  very  much 
that  we  find  it  undesirable  to  do  this,  for  the  following  reasons: 

1.  The  strength  of  any  rigid  culvert  pipe  is  usually  expressed  as  a  factor  of  the 
horizontal  diameter  in  feet  per  hneal  foot  of  pipe.  In  Table  1  of  the  specification, 
this  factor  is  2,000.  During  the  last  month,  we  have  learned  that  the  Federal  Speci- 
fications Executive  Committee  has  been  working  on  a  proposed  federal  specification 
for  clay  sewer  pipe  including  culvert  pipe  and  proposes  to  use  for  acceptable  crushing 
strength  for  extra  strong  vitrified  clay  culvert  pipe  a  factor  of  2,200.  That  is  a  10 
percent  increase.  This  federal  committee  specification,  when  approved,  will  govern 
and  no  doubt  will  be  used  on  all  federal  purchases  by  departments,  agencies  and  indi- 
viduals buying  for  the  government  and  for  government  aid  projects. 

This  change  affects  the  most  important  single  requirement  in  a  rigid  culvert  pipe 
specification,  that  is,  strength.  Inasmuch  as  the  Public  Roads  Administration  will 
undoubtedly  use  the  federal  specification,  we  can  see  that,  as  the  choice  of  what  is 
probably  the  largest  single  consumer,  that  specification  will  undoubtedly  govern  the 
industry. 

The  strength  requirement  for  railroad  use  is  unquestionably  higher  than  for 
street  or  highway  use,  due  to  loading  and  impact.  Therefore,  the  strength  factor  in 
the  AREA  specification  should  be  at  least  as  high  as  any  other. 

The  industry,  speaking  through  the  Clay  Products  Association,  I  understand  is 
not  averse  to  this  higher  crushing  strength,  and  the  question  of  putting  the  smaller 
producers  out  of  business  does  not  enter  into  the  matter,  especially  in  view  of  the  fact 
that  this  so-called  extra  strong  or  triple  strength  clay  pipe  is  a  new  product  and  not 
as  yet  widely  produced. 

2.  The  federal  specification  now  being  discussed  also  tightens  up  a  little  on  some 
of  the  tolerances. 

3.  We  also  find  that,  by  rearrangement.  Tables  1,  2  and  3  as  presented  and  now 
before  you  can  be  combined  in  one  table,  which  will  be  far  simpler  and  easier  of 
understanding  by  the  inspector  for  any  purchaser,  which  will  in  itself  be  highly 
desirable.  If  you  doubt  that  statement,  just  take  the  dimensions  in  Table  2  and  try  to 
apply  the  tolerances  as  set  out  in  Table  3.  Unless  you  have  better  luck  than  Mr.  Botts 
and  I  had  with  some  of  them,  you  will  be  quite  confused. 

This  new  table  eliminates  all  the  arithmetic  which  the  inspector  has  to  apply.  It 
simply  sets  before  him  the  dimensions  for  each  diameter  of  pipe  that  are  acceptable 
and  those  which  are  outside  of  the  specification. 

For  the  above  reasons  and  the  further  fact  that  we  feel  that  any  specification 
issued  by  our  Association  should  be  as  nearly  perfect  and  complete  as  we  can  make  it, 
the  committee  desires  to  retain  jurisdiction  over  this  subject  for  another  year  for  the 
purpose  of  making  these  essential  revisions.  In  making  this  request,  we  feel  that  we 
are  pursuing  the  proper  course  and  are  not  putting  something  in  the  Manual  that  in 
a  year  or  two  will  have  to  be  revised  at  considerable  expense  to  the  Association. 

In  1933  the  Association  adopted  specifications  for  pipe  line  crossings  under  railway 
tracks.  These  were  inclusive  specifications  for  pipe  lines  carrying  all  substances  and 
were  worked  out  in  collaboration  with  Committee  20  of  this  Association  and  the 
American  Petroleum  Institute  after  a  protracted  series  of  conferences. 

These  specifications  have  been  found  to  be  very  satisfactory  except  that  they 
are  too  rigid  for  pipe  lines  carrying  non-inflammable  substances.  The  Committee  on 
Outline  of  Work  therefore  gave  us  the  job  of  preparing  a  new  specification  for  that 
class  of  crossing. 


..^ Discussion 833 

We  found,  however,  that  the  scope  of  the  specification  now  in  the  Manual  will 
have  to  be  revised  before  we  can  present  a  specification  for  non-inflammable  substances. 

Therefore,  calling  attention  to  page  556,  we  desire  to  move  for  adoption  in  the 
Manual  the  change  indicated  at  the  middle  of  the  page.  The  present  form  for  the 
specification  for  pipe  Unes  carrying  inflammable  substances  reads  as  follows: 

"Pipe  lines  included  under  these  specifications  are  those  installed  to  carry  oil,  gas, 
gasoline  or  other  inflammable  or  highly  volatile  substance,  under  pressure,  [now  I 
want  to  call  your  particular  attention  to  this  clause]  or  any  substance  which  from  its 
nature  or  pressure  might  cause  damage  if  escaping  on  or  in  vicinity  of  railway  property. 
Gas  transmission  and  distribution  lines  in  city  streets,  carrying  less  than  45  pounds 
pressure,  are  not  to  be  considered  as  coming  under  these  specifications." 

That  clause  to  which  I  called  your  attention  must  be  deleted  from  the  specification 
now  in  the  Manual  so  that  it  will  read: 

"Pipe  lines  included  under  these  specifications  are  those  installed  to  carry  oil, 
gas,  gasoUne  or  other  inflammable  or  highly  volatile  substance,  under  pressure.  Gas 
transmission  and  distribution  lines  in  city  streets,  carrying  less  than  45  pounds  pressure, 
are  not  to  be  considered  as  coming  under  these  specifications." 

The  specification  for  oil  pipe  line  crossings  does  not  have  the  paragraphs  numbered 
nor  is  the  subject  matter  in  any  way  outlined.  Therefore,  it  is  further  recommended 
that  to  save  time  in  the  use  of  this  specification  that  each  paragraph  be  given  headings 
as  shown  in  the  skeleton  form  as  printed.  There  has  been  not  the  slightest  change  in 
the  specification  itself  for  the  obvious  reason  that,  if  we  did  that,  it  would  again  be 
necessary  to  go  to  the  American  Petroleum  Institute  for  approval.  This  addition  of 
headings  is  simply  to  make  the  specification  easier  to  use. 

I  move  that  the  changes  in  the  present  specification  for  pipe  line  crossings  carrying 
inflammable  substances  be  revised  as  I  have  read. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Swartout:  The  specification  for  non-inflammable  substances  beginning  on  page 
557  is  offered  this  year  as  information  so  that  the  members  will  have  the  specification 
before  them  for  a  year  and  during  that  time  can  give  the  committee  any  suggestions 
or  criticisms  or  additions  which  they  may  think  desirable.  It  is  our  intention  to  submit 
it  next  year  for  inclusion  in  the  Manual. 

Chairman  Botts:  The  fifth  and  sixth  assignment?  of  thi^  committee  are  Roadway: 
Settlement,  shrinkage,  subsidence,  and  Placing  material  in  embankments,  which  will  be 
presented  by  Mr.  Chipman,  chairman  of  the  subcommittee. 

Paul  Chipman  (Pere  Marquette) :  This  report  covers  two  assignments.  Assignment 
4  (a)  involves  a  revision  of  material  in  the  Manual  relating  to  shrinkage  and  subsidence. 

(Mr.  Chipman  read  the  first  paragraph  on  page  559.) 

Mr.  Chipman:  The  present  form  in  the  Manual  is  shown  in  italics  on  page  559. 
The  proposed  form  is  shown  on  page  560.  The  subjects  of  shrinkage  and  sub.sidence 
are  considered  separately. 

(He  then  read  the  paragraph  headings  on  page  560.) 

Mr.  Chipman:  Under  Subsidence  the  conclusions  are  those  presented  last  year 
as  information.  I  would  like  to  call  attention  to  an  error  in  printing.  Under  S  (a)  the 
first  word  should  be  "settling"  instead  of  "setting." 

I  move  that  this  revision  of  the  Manual  be  made. 

(The  motion  was  put  to  a  vote  and  carried.) 

Mr.  Chipman:  Assignment  4  (b)  deals  with  artificial  compaction  of  embankments. 
Until   recent  years  we  have  depended   upon   Nature   to   complete   the  solidification   of 


834  Roadway    and    Ballast 


fills,  but  highway  engineers  concluded  that  Nature  is  too  slow  and  have  very  generally 
adopted  methods  of  compaction  by  rolling  and  sprinkling  that  were  primarily  developed 
for  earth  dams  and  reservoir  walls.  Th.s  report  discusses  the  applicability  of  such 
methods  to  railroad  work. 

Their  justification  on  railroads  depends  largely  on  the  nature  and  extent  of  the 
traffic.  Under  heavy  or  fast  traffic,  surfacing  to  take  up  settlement  must  be  done  more 
frequently  and  at  greater  cost  than  if  traffic  is  light  or  slow.  Where  the  new  fill  is  to 
carry  fast  or  heavy  traffic  from  the  start,  as  in  the  case  of  a  change  of  line,  special 
compaction  may  well  be  justified.  It  is  useful  for  detour  tracks  around  grade  separation 
projects,  where  a  part  of  the  track  is  on  an  old  fill  and  part  on  the  new  one,  especially 
if  reduction  of  speed  must  be  minimized. 

That  portion  of  the  report  ending  with  and  including  the  bibliography  at  the  top 
of  page  564  is  submitted  as  information. 

Provision  for  sprinkling  or  rolling  or  both,  in  cases  where  such  treatment  is  desirable, 
calls  for  the  revision  of  Sections  33  and  34  of  the  Specifications  for  the  Formation  of 
the  Roadway.  The  committee  recommends  that  present  Sections  3i  and  34  be  with- 
drawn and  that  they  be  replaced  by  new  Sections  33  and  34.  The  present  form  of 
Section  33  is  shown  in  italics  on  page  564  and  the  proposed  form  just  below  it. 

Present  Section  34  in  regard  to  Rolling  is  shown  at  the  bottom  of  page  564.  Pro- 
posed form  of  Section  34  is  headed  Moisture  Content,  Rolling.  It  provides  for  com- 
pacting fills  by  methods  which  are  in  very  general  use  in  building  highways.  Our 
specifications  have  not  heretofore  provided  for  such  treatment. 

I  move  that  the  Manual  be  revised  as  recommended. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

(Vice-President   Clarke  assumed  the  chair.) 

Chairman  Botts:  The  seventh  assignment  of  this  committee  is  tunnel  lighting.  In 
the  absence  of  the  subcommittee  chairman,  Mr.  Moore,  I  will  attempt  to  present  the 
subject. 

(Chairman  Botts  read  the  first  four  paragraphs  found  at  the  bottom  of  page  565.) 

Chairman  Botts:  I  recommend  and  move  that  the  material  under  704.  Lighting, 
at  the  top  of  page  566  be  adopted  for  inclusion  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Botts:  Our  eighth,  ninth  and  tenth  assignments  are:  Corrosion-resisting 
fence  wire.  Wood  fence  posts,  and  Electrified  fences,  and  will  be  presented  by  Mr. 
Hillman  in  the  absence  of  Mr.  Jones,  the  chairman. 

F.  W.  Hillman  (Chicago  &  North  Western):  Your  committee  is  collaborating  with 
and  receiving  reports  of  the  exposure  tests  of  farm  field  fence,  unfabricated  wire, 
wire  strand,  barbed  wire  and  chain  link  fencing  of  ASTM  Committee  A-5  on  Corrosion 
of  Iron  and  Steel.  The  first  report  of  this  committee  is  published  in  the  ASTM  Pro- 
ceedings for  1939,  Vol.  42,  page  156.  It  indicates  the  trends  as  shown  in  the  sub- 
committee's report  which  is  offered  as  information. 

Wood  Fence  Posts,  Specifications:  This  committee  has  collected  a  number  of 
specifications  for  wood  fence  posts  now  in  use,  and  after  a  thorough  study  of  these, 
offers  the  following  specifications  as  information  and  invites  comments  and  criticisms 
prior  to  offering  them  for  inclusion  in  the  Manual  at  the  1942  convention. 

Electrified  Fences:  This  committee  has  collaborated  with  Committee  3— Overhead 
Transmission  Line  and  Catenary  Construction  of  the  Electrical  Section,  Engineering 
Division,  AAR.  The  report  of  the  subcommittee  includes  method  of  construction, 
securing  power,  and  reference  to  certain  codes  that  it  has  been  able  to  find.  It  quotes 


Discussion _^ R3S 

from  the  General  Orders  ot  the  Industrial  Commission  of  Wisconsin  which  seem  to  he 
the  most  complete  that  we  have  found  so  far. 

Electric  fences  are  increasing  in  use  for  farm  fencing.  Their  application  to  right- 
of-way  would  require  determination  in  each  state  as  to  meet  the  requirements  for 
legal  right-of-way  fence.  Policing  is  necessary  to  keep  vegetation  cleared  as  a  possible 
cause  of  short  circuits.  This  type  of  fencing  along  the  right-of-way  would  lend  itself  to 
claims  for  injury  to  persons  and  to  stock. 

The  committee  is  of  the  opinion  that  the  electric  fence  is  not  suitable  for  general 
use  as  a  right-of-way  fence. 

The  report  is  submitted  as  information. 

Chairman  Botts:  The  eleventh  assignment  of  this  committee  is:  Design  of  signs. 
It  will  be  presented  by  Mr.  Drumeller,  chairman  of  the  subcommittee. 

L.  J.  Drumeller  (Chesapeake  &  Ohio):  As  may  be  noted  from  the  report,  the 
committee  has  prepared  a  tabulation  of  answers  received  from  the  questionnaire  mailed 
to  a  number  of  roads  showing  the  various  types  of  signs  appearing  in  Manual  pages  1-87 
and  1-88  under  the  heading  "901.  Roadway  Signs  Required." 

Due  to  the  great  diversity  of  signs  now  in  use  on  the  various  roads,  your  committee 
is  of  the  opinion  it  would  be  impractical  to  develop  a  recommended  design  for  road- 
way signs.  We  believe,  however,  that  individual  roads  could  effect  some  economies  by 
the  reduction  in  the  number  of  shapes  of  signs,  as  suggested  in  the  third  paragraph 
of  this  report.  This  report  is  offered  as  information. 

Chairman  Botts:  The  twelfth  and  thirteenth  assignments  of  this  committee  are 
Ballast  section  design  and  Adherence  to  stone  specifications,  particularly  as  pertaining 
to  size.  The  reports  thereon  will  be  presented  by  Mr.  Kennedy,  the  chairman  of  the 
subcommittee. 

A.  D.  Kennedy  (Atchison,  Topeka  &  Sante  Fe) :  The  ballast  sections  that  this  com- 
mittee is  offering  for  adoption  this  year  are  along  similar  lines  to  the  sections  now  in 
the  Manual.  They  are  for  materials  under  20  percent  crushed  and  for  pit  run  gravel. 
They  are  designed  for  curves  of  over  three-inch  elevation.  I  move  that  these  sections 
be  adopted  for  printing  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Kennedy:  This  committee  also  reports  on  the  subject.  Adherence  to  stone 
ballast  specifications,  particularly  size.  In  the  first  place  I  want  to  call  your  attention 
to  an  error  at  the  top  of  page  574,  second  line.  The  dimension  "J/o-in."  should  be 
"^-in."  to  agree  with  that  in  the  table. 

From  the  replies  to  the  questionnaire  that  is  printed  on  pages  572  and  573,  the  com- 
mittee learned  that  53  percent  of  the  roads  using  stone  ballast  adhere  to  the  AREA 
specifications  as  to  size.  In  the  replies,  60  percent  of  them  indicated  that  they  wanted 
a  gradation  of  smaller  size  than  is  now  shown  in  the  Manual  or  in  those  specifications. 
For  that  reason,  and  primarily  to  conform  with  the  Bureau  of  Standards  Simplified 
Practice  Recommendation  R  163-39.  the  committee  recommends  that  Table  1  showing 
the  gradation  now  shown  in  the  specification  be  withdrawn  and  replaced  with  Table  2 
shown  right  below  it  on  page  573.  The  only  difference  between  the  two  tables  is  merely 
in  the  matter  of  designation  and  arrangement,  and  you  will  note  that  we  add  size 
No.  57  as  indicated  in  the  replies  to  the  questionnaire.  I  move  that  this  change  be  made. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Botts:  The  next  assignment  is  Investigate  the  use  of  asphalt  in  ballast. 
Mr.  Podmore  has  a  brief  progress  report. 

(J.  M.  Podmore.  New  York  Central,  rearl  the  report  on  assignment  10  (c)  found 
on  pages  571  and  572.) 


836 Track 

Mr.  Podmore:  I  might  say  that  the  test  section  has  gone  through  two  winters, 
and  there  has  been  no  heaving  of  track  either  winter,  and  the  track  at  either  end  of 
this  test  section  has  heaved.  The  track  is  fully  tie-plated.  In  order  to  bring  the  track 
down  at  the  end  of  the  test  section,  it  was  necessary  to  take  off  the  tie  plates.  It  has 
stood  up  better,  I  think,  this  winter  than  it  did  last.  This  is  due  to  the  fact,  I  believe, 
that  we  did  a  little  work  on  it  last  summer.  It  is  showing  very  good  results. 

Chairman  Botts:  For  our  final  assignment.  Revision  of  Manual,  we  have  nothing 
to  offer  other  than  what  has  already  been  presented.  This  concludes  the  report  of  this 
committee. 

Vice-President  Clarke:  If  there  is  no  further  discussion,  the  committee  will  be 
excused  with  the  thanks  of  the  Association.  (Applause) 


Discussion  on  Track 

(For  Report,  see  pp.   575-638.) 

(Vice-President  H.  R.  Clarke  presiding.) 

Chairman  W.  G.  Am  (Illinois  Central):  The  first  assignment  is  Revision  of  Manual. 
Several  of  the  reports  which  will  be  submitted  by  the  respective  subcommittee  chairman 
contain  revisions  of  the  Manual  incident  to  the  work  of  those  subcommittees  this  year. 
In  addition,  there  are  several  items  of  revision  of  the  Manual  handled  by  the  sub- 
committee assigned  to  that  subject.  Mr.  Zeeman,  chairman  of  that  subcommittee,  will 
submit  the  report. 

M.  J.  T.  Zeeman  (Atchison,  Topeka  &  Sante  Fe) :  The  first  revision  is  a  little 
change  in  the  language  in  one  of  the  notes  in  the  tie  plate  specification  which  pertains 
to  the  question  of  how  much  overweight  will  be  paid  for.  We  recommend  that  the 
present  paragraph  shown  as  401  (e)  be  deleted  and  in  lieu  thereof  the  following 
paragraph  be  inserted: 

(e)  Tie  plates  shall  be  paid  for  on  the  basis  of  actual  weight  as  applied  to  the 
entire  order,  except  that  payment  shall  not  be  made  for  any  weight  in  excess  of  three 
percent  over  the  weight  calculated  from  the  specified  dimensions. 

There  is  no  change  in  the  intent.  The  object  is  to  clarify  the  meaning.  I  move 
the  adoption  of  this  change. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Zeeman:  The  change  just  approved  was  in  the  specifications  for  soft  and 
medium  grade  of  steel  tie  plates.  It  is  suggested  the  same  paragraph  be  inserted  in 
the  hot  worked  high  carbon  specification  on  page  S-14.2,  paragraph  401  (f)  in  the 
Manual,  in  lieu  of  the  one  that  is  there  now.  I  so  move. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Zeeman:  The  next  revision  your  committee  submits  is  in  the  design  of  the 
track  spike  on  page  5-16.2.  The  only  change  recommended  is  a  slight  decrease  in  the 
size  of  the  head  which  is  now  shown  as  1^  in.  square,  which  it  is  suggested  be  reduced 
to  1t%  in.,  conforming  to  the  other  5^-in  spike  in  the  Manual,  which  we  are  not  now 
considering.  The  reason  for  the  suggested  change  is  that  the  manufacturers  have  found 
difficulty  in  correctly  forming  the  head  of  the  spike  as  it  is  now  shown  in  the  Manual. 
Another  reason  is  that  certain  railroads  object  if  the  specified  tolerance  now  allowed  all 
falls  at  the  toe  end  of  the  spike. 

Your  committee  recommends  the  adoption  of  the  design  submitted  in  lieu  of  the 
design  now  in  the  Manual.  I  so  move. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 


Discussion  83  7 


Mr.  Zeeman:  The  next  revision  submitted  is  on  page  5-34  of  the  Manual  where 
a  tabulation  is  shown  giving  the  permissible  speed  through  turnouts.  This  table  is  based 
on  the  use  of  straight  switch  points.  In  view  of  the  fact  that  the  ARE.\  now  has 
recommended  practices  for  curved  switch  points  as  well  as  straight  switch  points,  and 
in  view  of  the  fact  that  some  of  the  lengths  now  shown  in  the  Manual  do  not  conform 
to  standard  recommended  switch  point  lengths  in  the  Manual,  your  committee  recom- 
mends the  deletion  of  the  present  text  in  the  Manual  and,  in  lieu  thereof,  the  adoption 
of  two  paragraphs  and  the  two  tables  giving  the  permissible  speed  through  turnouts, 
one,  turnouts  with  straight  switch  points  of  standard  AREA  lengths,  and  another 
table  showing  the  permissible  speed  in  miles  per  hour  for  turnouts  with  curved  switch 
points.  The  committee  also  recommends  the  deletion  of  Fig.  511. — Speed  of  Trains 
Through  Level  Turnouts  now  in  the  Manual  on  page  5-35.  I  move  these  adoptions  be 
approved. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Zeeman:  The  next  revision  submitted  to  this  convention  is  on  the  subject  of 
tamping.  The  matter  on  tamping  appearing  on  page  5-45  was  adopted  in  1905,  and  is 
quite  inadequate  for  the  present  day,  in  view  of  the  changes  in  practice  since  that  time. 
The  present  Manual  specifies  a  certain  distance  for  tamping  inside  and  outside  of  the 
tie.  Since  this  rule  was  adopted  in  1905,  it  is  quite  evident  that  it  was  based  on  the 
use  of  eight-foot  ties.  As  there  is  practically  IS  in.  from  the  outside  edge  of  the  base  of 
a  112-lb.  rail  to  the  end  of  an  8-ft.  tie,  it  follows  that  in  order  to  secure  uniform 
bearing  it  would  be  necessary  to  specify  tamping  for  a  distance  of  15  in.  inside  the  tie. 

However,  Dr.  Talbot,  in  reports  of  the  Special  Committee  on  Stresses  in  Railroad 
Track,  has  stated  that  some  distance,  possibly  three,  four  or  maybe  five  inches  from 
the  end  of  the  tie  is  ineffective  for  bearing  purposes.  We  feel  that  some  consideration 
should  be  given  to  this.  If  15  in.  is  correct  for  an  8-ft.  tie,  when  a  road  goes  to  9-ft. 
ties,  to  get  the  increased  bearing  area,  an  equal  amount  should  be  added  for  tamping 
on  the  inside  of  the  rail  in  order  to  get  uniform  bearing. 

There  seems  to  be  quite  a  difference  of  opinion  on  this  subject.  However,  your 
committee  recommends  the  deletion  of  the  present  text  on  tamping  which  is  now 
shown  on  page  5-45  and  in  lieu  thereof  adopt  the  text  shown  on  page  579  as  a  substitute 
for  the  present  text.  I  so  move. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Zeeman:  The  last  recommended  revision  is  a  little  insertion  on  the  page  con- 
taining the  Table  of  Contents,  in  order  to  show  clearly  where  the  data  for  gages  and 
flangeways  can  be  found.  It  comprises  a  reference  to  the  Portfolio  of  Trackwork  Plans. 
I  so  move. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Am:  The  next  assignment  of  this  committee  is  Fastenings  for  continuous 
welded  rail.  Mr.  Magee  is  chairman  of  this  subcommittee  and  will  submit  a  progress 
report. 

G.  M.  Magee  (Association  of  .'\merican  Railroads):  The  most  important  phase 
of  the  work  on  this  assignment  has  been  to  inspect  and  report  on  the  service  perform- 
ance of  installations  of  continuous  welded  rail  with  various  types  of  fastenings.  Four 
different  test  installations  with  four  different  types  of  fastenings  are  included  in  this 
year's  report.  I  am  sure  you  will  be  interested  in  knowing  there  has  been  nothing  in 
the  service  performance  to  date  to  indicate  the  continuous  welded  rail  is  not  a  practical 
development,  if  properly  secured  to  the  ties.  Broken  rails  have  been  reported  in  this 
and  previous  reports,  and  the  method  by  which  these  have  been  corrected  is  of  general 
interest. 


838 Track 

The  committee  was  also  instructed  to  present  a  recommended  design  of  screw  spike 
to  secure  the  tic  plate  to  the  tie  independently  of  the  rail  fastening.  There  does  not 
seem  to  be  at  this  time  a  trend  toward  increasing  the  use  of  screw  spikes  for  this 
purpose. 

A  description  and  discussion  of  the  relative  advantages  and  disadvantages  of  two 
kinds  of  screw  spikes  which  have  been  used  for  this  purpose  are  presented  as  a  matter 
of  information.  If  you  are  interested  in  the  use  of  screw  spikes  for  this  purpose,  this 
information  will  be  of  value  to  you. 

Chairman  Arn:  The  next  assignment  is  a  subject  on  which  we  have  been  working 
for  several  years  and  have  submitted  plans  from  time  to  time.  We  now  have  further 
plans  to  submit.  The  subject  is:  Plans  and  .specifications  for  track  tools  and  recom- 
mended limits  of  wear.  Mr.  Roller,  chairman  of  this  subcommittee,  will  submit  the 
report. 

W.  L.  Roller  (Chesapeake  &  Ohio):  Plan  No.  7 — Tie  Tongs,  which  appears  in  the 
Manual  on  page  5-57,  Fig.  519:  These  tongs  were  found  to  be  too  light  and  we  are 
offering  a  substitute  in  a  heavier  design  to  overcome  the  fault  in  this  tool  and  to 
present  a  design  that  will  hold  the  rivet  better.  I  move  the  adoption  of  Plan  No.  7-41. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Roller:  Plan  27-40  in  the  Manual,  has  been  revised  as  Plan  No.  27-41 — 
Track  Level,  as  to  a  few  dimensions  which  were  overlooked  in  the  original  publication. 
I  move  the  adoption  of  this  revision. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Roller:  Last  year  the  committee  offered  as  information  Plan  No.  20A-40  as 
an  alternate  to  the  pipe-connected  gage  in  the  form  of  a  wood  connected  gage.  We  arc 
offering  this  same  plan  for  adoption  this  year,  with  slight  revisions. 

I  so  move. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Roller:  As  Chairman  Arn  has  said,  this  committee  has  been  assigned  a  new 
subject:  Recommended  limits  of  wear  of  track  tools.  Considerable  discussion  arose  as 
to  just  who  was  to  be  the  judge  of  the  amount  of  wear  on  the  track  tools  before  they 
were  scrapped.  The  conclusion  was  reached  that,  since  this  subject  was  offered  by  the 
Purchases  and  Stores  Division  for  the  matter  of  reclamation,  the  plan  should  be  so 
devised  as  to  set  limits  of  wear  to  which  a  tool  could  be  worn  before  it  was  scrapped. 
Certain  requisites  were  set  up,  and  I  will  read  the  part  of  our  report  found  on  page  587: 

It  was  assumed  in  pursuing  the  study  of  limits  of  wear  for  track  tools,  that  a 
definite  recommendation  is  desired  for  each  particular  tool  which  would  indicate  the 
minimum  limit  of  reclaimed  tools.  Only  tools  which  are  otherwise  sound  and  service- 
able without  flaw  or  physical  defect  should  be  considered  for  reclamation  and  the 
minimum  recommended  sizes  of  reclaimed  tools  are  indicated  in  dashed  hnes  on  original 
plans. 

You  will  find  these  plans  on  pages  588  to  594,  showing  in  dashed  lines  the  com- 
mittee's recommendation  as  to  limits  of  wear. 

(Mr.  Roller  then  read  the  fourth,  fifth  and  sixth  paragraphs  under  Recommended 
Limits  of  Wear  of  Track  Tools  on  page  587.) 

Mr.  Roller:  Then  follows  a  description  of  the  manner  of  reclaiming.  There  is  one 
phase  of  this  report  to  which  we  want  to  pay  particular  emphasis.  The  committee 
has  construed  the  subject  to  mean  that  no  additional  material  will  be  applied  to  bring 
the  tool  to  a  desired  contour  or  to  restore  it  to  its  original  shape. 

This  report  is  one  of  information,  and  the  committee  recommends  its  continued 
study.  We  also  wish  to  recommend,  in  closing,  that  the  assignment  in  general  be  continued 


Discussion  83Q 


as  we  wish  to  continue  the  study  of  specifications  of  hickory  handles  and  ash  handles 
for  tools. 

Chairman  Arn:  As  you  are  aware,  this  committee  has  been  endeavoring  to  do  a 
complete  overhauling  of  the  Manual  of  Trackwork  Plans.  This  has  been  quite  an 
extensive  job  and  has  been  under  way  now  for  two  years.  We  are  submitting  the 
second  group  of  plans  for  your  approval.  Mr.  Caruthers,  chairman  of  the  subcommittee, 
will  submit  this  report. 

E.  W.  Caruthers  (Pennsylvania):  At  the  last  convention  the  Association  adopted 
a  number  of  plans  that  were  presented  by  the  committee  as  key  plans.  We  reviewed 
and  selected  certain  plans  that  were  considered  more  or  less  of  a  key  nature,  based 
on  the  adoption  by  the  Association,  of  these  plans.  Work  has  been  continued  on  the 
balance  of  the  plans,  and  we  now  wish  to  present  for  adoption  a  series  of  plans  covering 
the  various  items  of  trackwork. 

(Mr.  Caruthers  then  offered  a  series  of  motions  submitting  for  adoption  and 
publication  in  the  Manual  of  all  of  the  plans  with  a  suffix  " — 41"  that  are  listed  on  pages 
596  to  600,  inclusive.  All  of  the  motions  were  seconded,  put  to  a  vote  and  carried.) 

Mr.  Caruthers:  A  number  of  plans  are  listed  that  will  be  revised  and  reissued, 
but  the  revisions  are  not  material,  and  it  was  not  thought  that  it  would  be  necessary 
to  offer  these  plans  for  any  action  by  the  Association. 

In  view  of  the  adoption  of  the  plans  that  have  been  presented,  there  is  a  group 
of  plans  starting  about  the  middle  of  page  600  which  may  now  be  withdrawn,  and 
I  move  the  withdrawal  of  the  plans  as  listed,  starting  on  page  600  and  continuing 
through  to  page  605. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  .\rn:  The  next  subject  assigned  to  the  committee  is  Corrosion  of  rail  and 
fastenings  in  tunnels.  Mr.  Perlman,  the  chairman  of  this  subcommittee,  will  submit  the 
report. 

A.  E.  Perlman  (Denver  &  Rio  Grande  Western):  In  1938  a  study  was  begun  on 
this  subject  using  the  Moffat  tunnel  for  a  testing  ground  and  using  the  D.  &  R.  G.  W. 
laboratory  facilities  to  help  in  these  tests. 

Heavy  Mallet  steam  power  is  used  through  the  Moffat  tunnel,  which  is  6.21  miles 
long,  and  there  are  as  many  as  34  train  movements  a  day  through  the  tunnel.  The 
problem  came  about  through  the  formation  of  sulfurous  acid  gases  which  attack  the 
metal,  especially  where  metal  touches  metal.  The  shanks  of  spikes  were  eaten  out  to 
within  50  percent  of  the  cross-section,  and  where  angle  bars  touched  bolts  or  where 
angle  bars  touched  rail,  the  problem  was  greatly  aggravated. 

As  a  result,  several  methods  were  tried  in  an  attempt  to  overcome  this  difficulty. 
About  1,000  test  pieces  with  protective  coatings  of  a  non-metallic  nature  were  used. 
A  number  of  corrosion-resistant  alloys  were  used,  and  sprayed  metal  plates  and  cathodic 
protection  were  attempted,  and  also  the  neutralization  of  the  stack  gases  through  the 
use  of  lime  in  the  locomotives. 

.\s  pointed  out,  starting  on  page  605,  the  committee  found  no  practical,  or  economical 
means  of  employing  a  corrosion-resistant  alloy,  because  the  materials  tested  depend 
upon  a  protecting  film  of  corrosion  products  for  their  resistance  and  this  protecting 
film  naturally  cannot  be  maintained  on  the  running  surface  of  the  rail. 

Then  there  are  a  number  of  other  conclusions,  namely,  that  while  you  can  protect 
the  metal  with  a  metal  spray,  there  is  no  way  of  protecting  the  running  surface  of  the 
rail,  so  a  special  section  would  have  to  be  used  in  which  the  running  surface  would  be 
of  greater  thickness  than  would  normally  be  used,  and  the  rest  of  the  metal  could  be 


840 Track ^ 

protected  by  a  metal  spray.  The  only  other  way  of  overcoming  the  difficulty  would 
be  through  the  use  of  Diesel  or  electric  power.  Electric  power  would  entirely  overcome 
the  difficulties.  There  is  some  sulfur  in  Diesel  oil  and  while  certain  oil  companies  put 
out  a  special  Diesel  oil  with  a  low  sulfur  content,  even  with  this  there  would  still  be 
some  sulfurous  acid  formed. 

This  report  is  submitted  as  information  with  the  recommendation  that  the  subject 
be  discontinued. 

C.  H.  Blackman  (Louisvile  &  Nashville):  May  I  ask  if  the  committee  has  tried 
ventilation  to  reduce  the  corrosion. 

Mr.  Perlman:  A  different  type  of  fan  was  recently  installed  in  the  tunnel,  which 
moves  the  air  through  the  tunnel  twice  as  quickly  as  the  old  fan.  We  have  found  it 
dries  out  the  rail  and  ballast  section  much  more  rapidly  than  the  old  fan,  but  for 
20  min.  after  a  train  has  gone  through  the  tunnel  moisture  is  formed.  This  is  because 
the  inside  of  the  tunnel  stays  at  a  uniform  temperature  throughout  the  year,  while  it 
may  be  30  deg.  below  zero  or  80  deg.  above  outside.  We  are  bound  to  get  condensate 
in  the  tunnel  when  we  have  as  much  water  present  as  is  evaporated  by  a  locomotive. 
We  feel  the  ventilating  system  will  help  a  great  deal  but  it  will  not  overcome  the 
difficulty. 

Chairman  Am:  On  the  next  assignment.  Design  of  tie  plates  for  RE  rail  sections, 
there  is  no  report  this  year. 

The  next  subject  is:  Practicability  of  using  "reflex"  units  for  switch  lamps  and 
targets.  Mr.  Adams,  chairman  of  the  subcommittee,  will  submit  this  report. 

L.  L.  Adams  (Louisville  &  Nashville) :  Your  committee  did  not  think  it  necessary 
to  send  out  a  questionnaire  this  year  to  determine  the  number  of  reflex  lamps  being 
used  on  the  various  roads.  This  information  was  secured  in  1939  and  reported  in  the 
Proceedings  for  that  year.  However,  from  information  that  we  secured  in  an  informal 
way,  there  is  no  doubt  that  the  use  of  reflex  light  units  is  being  extended  and,  due 
to  the  saving  that  can  be  effected  by  these  units,  that  use  has  been  substantial  and  is 
well  worth  considering  by  any  railroad. 

We  have  learned  that  some  states  had  laws  pertaining  to  the  use  of  switch  lamps 
on  main  line  turnouts,  so  we  arranged  for  a  check  of  these  laws.  We  find  that  nine 
states  have  such  laws.  Any  road  operating  in  those  states  should  give  them  consideration 
before  doing  away  with  the  oil  lamps.  However,  there  are  as  many  as  39  states  that 
have  no  law  pertaining  to  this  matter.  The  report  is  submitted  as  information. 

Chairman  Arn:  The  next  assignment  is:  Welding  of  manganese  castings  in  special 
trackwork.  The  manganese  castings  which  were  submitted  for  test  and  are  under- 
going test  have  held  up  so  well  that  there  is  nothing  as  yet  to  report  on  them. 

The  next  subject  is:  Bolt  tension  necessary  for  proper  supporting  of  rail  joints. 
Mr.  Breed,  the  chairman  of  the  subcommittee,  will  submit  this  report. 

C.  W.  Breed  (Chicago,  Burlington  &  Quincy):  There  is  a  small  correction  on  page 
610.  Under  Loss  of  Bolt  Tension  the  date  should  be  October  5,  1938  instead  of  1939. 
Previous  reports  of  this  subcommittee  on  bolt  tension  appear  in  the  1939  and  1940 
Proceedings. 

This  report  contains  considerable  data  on  the  out-to-out  measurement  of  joint  bars. 
A  study  of  these  data  for  test  joints  maintained  with  high,  medium  and  low  bolt  tension 
indicates  that  there  is  little  difference  in  the  rate  of  wear  of  the  fishing  surface  due  to 
the  amount  of  bolt  tension.  Fishing  wear  appears  to  have  some  relation  to  traffic 
density,  but  further  data  are  required  to  definitely  estabhsh  this  relation. 

You  will  recall  that  last  year's  report  included  a  statement  of  monthly  loss  of  bolt 
tension  throughout  the  year  which   varied  from   800  to   1,500  lb.  Loss  of  bolt  tension 


Discussion 841 

per  month  in  the  second  year  appears  to  be  about  the  same  as  in  the  first  year.  In  the 
first  and  second  months,  after  retightening,  bolt  tension  falls  away  rather  rapidly,  and 
then  settles  down  to  a  more  moderate  rate  of  loss.  This  loss  averages  500  to  1,000  lb. 
per  month,  depending  upon  the  type  of  spring  washer  used,  the  amount  of  bolt  tension 
applied  at  tightening  and  the  traffic  density. 

For  determining  the  amount  of  tension  to  be  applied  in  tightening,  it  is  suggested 
that  the  upper  value  of  1,000  lb.  loss  per  month  be  used.  For  example,  if  it  is  desired 
that  bolt  tension  should  not  be  less  than  5,000  lb.,  and  if  tightening  is  to  be  done 
once  a  year,  then  17,000  lb.  per  bolt  should  be  applied.  If  tightening  is  to  be  done 
at  sLx-month  intervals,  11,000  lb.  per  bolt  should  be  applied. 

The  committee  has  given  much  attention  to  the  problem  of  securing  uniformity 
of  bolt  tension  in  bolt  tightening.  The  test  data  indicated  that  power  wrenches,  when 
properly  used,  will  give  somewhat  better  uniformity  than  hand  tightening,  but  the 
improvement  is  not  great.  A  difficulty  with  machine  tightening  is  that  the  machine  has 
greater  tightening  capacity  than  hand  tightening  and,  if  improperly  handled,  is  likely 
to  result  in  very  high  bolt  tensions.  With  either  hand  or  machine  tightening,  values 
of  bolt  tension  may  be  expected  to  be  5,000  to  10,000  lb.  greater  or  less  than  the  average 
obtained.  Variation  in  friction  between  nut  and  bolt  is  principally  responsible  for  this 
variation. 

To  improve  this  condition,  some  railroads  are  getting  bolts  manufactured  to  a 
specification  requiring  minimum  and  maximum  values  of  5  and  25  lb.  at  the  end  of 
a  24-in.  wrench  to  turn  the  nut  throughout  the  threaded  length. 

Reliable  means  are  needed  for  adjusting  the  bolt  tension  release  on  power  wrenches 
to  give  desired  tension.  Closer  supervision  of  operators  of  power  wrenches  is  necessary 
to  obtain  the  best  performance  out  of  present  adjustment. 

With  hand  tightening,  a  track  wrench  at  least  42  in.  long,  is  desirable  to  enable 
the  track  man  to  tighten  bolts  while  standing  upright.  Tests  have  shown  that  with 
a  wrench  of  this  length,  a  track  man  can  quite  easily  tighten  bolts  to  tensions  as  high 
as  35,000  to  40,000  lb.  if  he  is  permitted  to  jerk  on  the  wrench.  If  the  track  man  is 
trained  to  tighten  bolts  with  a  steady  pull  on  the  wrench,  bolt  tensions  of  15,000  to 
20,000  lb.  will  be  obtained  with  reasonable  uniformity  if  the  nut  and  bolt  friction  is 
reduced  as  previously  suggested. 

The  committee  acknowledges  the  invaluable  assistance  given  by  Mr.  G.  M.  Magee 
who  carried  out  the  greater  part  of  the  field  tests. 

This  report  is  submitted  as  information. 

G.  R.  Westcott  (Missouri  Pacific) :  I  am  wondering  if  any  survey  has  been  made 
by  this  committee  to  determine  to  what  extent  track  bolts  with  "finger  free"  threads 
are  used  over  the  country  and  to  what  extent  the  railroads  are  still  using  the  wrench- 
tight  nut.  I  am  thinking  particularly  of  the  use  of  power  machines.  If  you  use  a  power 
machine  on  a  wrench-tight  nut,  an  unknown  part  of  the  power  exerted,  of  course,  is 
applied  to  overcoming  the  friction  in  forcing  the  threads  of  the  nut  on  the  bolt,  whereas, 
with  "finger  free"  threads  on  the  bolt,  there  is  a  closer  relation  between  the  torque 
apphed  by  the  machine  and  the  tension  applied  in  the  bolt. 

Mr.  Breed:  We  haven't  had  a  test  with  a  "finger  free"  nut.  We  think  such  a 
test  is  a  possibility  for  obtaining  more  uniform  tension,  and  we  hope  to  include  it  in 
this  year's  work. 

Mr.  Westcott:  I  think,  perhaps,  this  is  something  that  ought  to  be  considered  be- 
cause there  are  a  number  of  railroads  in  the  country  that  have  been  using  "finger  free" 
nuts  for  a  number  of  years,  very  successfully.  I  mention  my  own  road  as  one  of  them. 


842  Track 

We  changed  some  five  or  six  years  ago,  and  have  never  had  any  thought  of  going 
back  to  wrench-tight  nuts.  I  recommend  that  the  committee  go  into  that,  as  suggested 
by  the  subcommittee  chairman. 

Mr.  Breed:  Mr.  Magee  has  a  few  remarks  to  make  about  "finger  free"  nuts  on 
the  Pennsylvania  test. 

Mr.  Magee:  I  didn't  intend  to  make  any  remarks  on  it  except  to  call  attention  to 
the  fact  that  the  tests  on  the  Pennsylvania  installation  were  made  on  "finger  free" 
nuts,  and  a  somewhat  better  uniformity  was  secured  in  tightening  the  bolts  during 
that  test,  compared  to  other  tests  where  wrench-tight  nuts  were  used. 

Vice-President  Clarke:  Isn't  it  the  intention  of  the  committee  to  consider  this 
matter  that  has  been  raised? 

Mr.  Breed:  Yes. 

Chairman  Arn:  The  next  subject  assigned  to  the  Track  committee  is:  Lubrication 
of  rail  on  curves.  Mr.  Hales,  chairman  of  that  committee,  is  unfortunately  not  able 
to  be  here.  The  chairman  for  next  year,  Mr.  Strattman,  will  submit  the  report. 

C.  R.  Strattman  (Michigan  Central) :  There  have  been  two  previous  reports  on 
this  subject,  in  the  Proceedings,  Vol.  39,  pages  419  to  421,  and  Vol.  40,  pages  575  to 
581.  I  will  just  read  the  conclusions  of  our  current  report. 

(Mr.  Strattman  read  the  conclusions  on  page  628.) 

Mr.  Strattman:  Your  committee  recommends  that  these  conclusions  be  adopted  and 
published  in  the  Manual.  I  so  move. 

(The  motion  was  put  to  a  vote  and  carried.) 

Chairman  Arn:  The  next  subject  is:  Prevention  of  damage  due  to  brine  drippings 
on  tracks  and  structures.  This  subject  is  being  considered  jointly  by  this  subcommittee 
and  a  committee  of  the  Mechanical  Division.  Mr.  Magee,  the  chairman  of  the  sub- 
committee, will  submit  the  report. 

Mr.  Magee:  If  you  will  recall,  past  reports  of  the  committee  have  advised  you 
of  progress  made  in  the  laboratory  in  determining  a  corrosion  inhibitor  which  could 
be  added  to  the  salt  used  in  refrigerator  cars  for  the  purpose  of  neutralizing  the 
corrosive  action  of  the  brine  drippings  in  the  track,  from  these  cars.  You  were  also 
informed  that  sodium-dichromate  and  soda  ash,  when  added  to  the  salt,  had  shown 
very  promising  results  in  laboratory  tests. 

An  interesting  test  was  conducted  this  year  to  determine  whether  this  inhibitor, 
sodium-dichromate  and  soda  ash,  if  used  in  refrigerator  cars,  would  dissolve  at  the 
same  rate  as  the  salt  and  be  contained  in  uniform  concentration  in  the  brine  drip 
throughout  the  car  trip. 

With  the  assistance  of  the  Santa  Fe  Refrigerator  Dispatch,  a  car  was  iced  and 
salted  with  salt  containing  this  inhibitor  at  Los  Angeles.  A  car  with  a  revenue  load 
destined  for  the  east  was  selected  for  this  test.  Samples  were  taken  of  brine  drippings 
at  intervals  over  a  period  of  eight  days.  This  included  the  period  for  pre-icing  the 
car  and  also  the  period  during  which  the  car  was  on  the  road  in  making  the  trip  from 
Los  Angeles  to  Kansas  City.  The  samples  were  then  analyzed  for  inhibitor  content 
by  the  Denver  &  Rio  Grande  Western  laboratory.  The  results  of  the  test  were,  in 
general,  satisfactory.  A  reasonably  uniform  concentration  of  inhibitor  was  found  in 
the  samples  of  the  brine  drippings  throughout  the  test  period. 

Additional  tests  are  now  under  way  to  determine  the  benefit  to  the  tanks  and 
trucks  of  the  refrigerator  cars  from  use  of  the  inhibitor. 

The  committee  at  this  time  is  pleased  to  report  that  the  progress  to  date  appears 
quite  encouraging.  It  should  also  be  noted  that  the  work  reported  is  the  result  of  joint 


Discussion  843 


investigational  work  by  both   the  Engineering  and  Mechanical  divisions.  This  report  is 
offered  as  information. 

Chairman  Arn:  The  next  subject  assigned  to  the  Track  committee  is:  Specifica- 
tions for  laying  rails  designed  to  set  up  the  requirements  for  good  workmanship.  This 
is  a  subject  on  which  the  subcommittee  has  been  working  for  about  three  years  and  on 
which  it  is  now  ready  to  submit  specifications.  Mr.  Schram,  the  chairman,  will  submit 
the  report. 

I.  H.  Schram  (Erie):  The  report  is  substantially  the  same  as  last  year  when  it 
was  submitted  as  information.  Comments  and  criticisms  were  requested,  a  number 
were  received  and  some  small  changes  were  made.  Unfortunately,  a  few  of  these 
criticisms  came  after  the  report  was  printed  in  the  Bulletin  and  these  late  criticisms 
were  considered  at  a  meeting  of  the  Track  committee,  at  which  some  of  them  were 
thought  worthy  of  adoption.  We  therefore  wish  to  make  the  following  changes: 

On  page  634,  the  first  paragraph  under  the  heading  "Unloading"  has  been  changed 
by  adding  a  period  after  the  word  "base"  in  the  second  line,  and  deleting  the  rest 
of  the  sentence.  The  committee  took  this  action  after  having  its  attention  called  to  the 
fact  that  practice  in  the  facing  of  the  brand  is  about  equally  divided. 

On  page  635,  the  second  paragraph  is  changed  by  substituting  the  word  "multiple" 
for  "double"  in  the  first  line.  The  committee  considers  that  multiple-track  lines  require 
the  same  treatment  as  double-track  lines. 

On  page  636,  under  the  heading  "Completion  of  Work,"  the  first  line  of  the 
sixth  paragraph  "All  ties  on  which  the  new  rail  does  not  have  a  full  bearing,"  etc.,  has 
been  changed  by  eliminating  the  word  "new"  before  rail  and  substituting  "newly  laid" 
so  that  the  sentence  reads  "All  ties  on  which  the  newly  laid  rail  does  not  have  a  full 
bearing  shall  be  tamped  and  the  spikes  re-driven ;  proper  slow  orders  shall  be  main- 
tained until  this  is  done."  This  change  was  made  by  the  committee  merely  to  clarify 
the  meaning. 

The  changes  that  were  made  during  the  year  were  rather  small.  On  page  634,  under 
"Unloading"  the  last  paragraph  was  revised  to  add  "that  small  material  shall  be  left 
in  the  containers  until  the  rail  is  laid".  Under  the  heading  "Laying",  the  word  "imme- 
diately" was  introduced  in  the  first  line  of  the  first  paragraph. 

On  page  635,  under  the  heading  "Laying",  the  paragraph  covering  application  of 
rail  anchors  has  been  revised  to  provide  for  the  immediate  application  of  the  full  quota 
of  raU  anchors. 

This  covers  the  changes  that  were  made  in  the  report  of  this  committee  following 
the  consideration  of  a  number  of  suggestions  received  by  the  committee.  I  move  that 
this  specification  be  adopted  and  published  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Arn:  The  final  subject  for  the  past  year's  work  is:  Spirals  for  high 
speed  operation.  Mr.  Baldridge,  the  chairman,  will  submit  this  report. 

C.  W.  Baldridge  (Atchison,  Topeka  &  Santa  Fe) :  The  subcommittee  on  Spirals 
for  high  speed  operation  endeavored  this  year  to  complete  the  work  that  was  not 
finished  last  year,  and  we  have  the  following  to  report: 

From  the  time,  more  than  one  hundred  years  ago,  when  the  first  railroad  was  built 
in  America,  to  the  present  time,  the  methods  of  construction  and  the  kinds  of  material 
used  both  in  roadway  and  equipment  have  been  undergoing  improvement  to  increase 
effectiveness  and  safety. 

One  of  the  incidents  of  the  opening  of  the  first  American  railway,  was  a  race  between 
the    famous   locomotive   Tom    Thumb    and   a    horse-drawn    vehicle,    in    which    the   horse 


844 Track 

was  the  winner.  At  that  time  and  for  several  years  thereafter,  curves  in  railway  tracks 
called  for  but  little  more  attention  than  was  required  by  tangent  track.  As  weights 
and  speeds  of  railway  trains  increased,  more  and  more  improvements  in  track  construc- 
tion and  maintenance  have  become  necessary.  The  first  improvement  in  the  alinement 
of  curves  and  the  nature  of  easements  at  the  ends  of  the  curves  was  accomplished  by 
beginning  with  a  short  length  of  low  degree  curve,  usually  a  two-degree  curve,  and 
continuing  by  two-degree  increments  until  the  degree  of  the  main  curve  was  reached, 
the  leaving  end  of  the  curve  being  made  in  the  same  manner  in  reverse.  It  has  not 
been  very  long  since  the  curve  records  of  some  railways  still  showed  curves  of  this 
nature  to  be  in  use.  It  was  but  natural  that  this  early  form  of  easement  should  be 
displaced  by  spiral  curves  beginning  with  very  small  variation  from  the  tangent  and 
continuing  an  increasing  degree  of  curvature  up  to  the  degree  of  the  central  part  of 
the  curve. 

When  the  high  speed  trains  of  the  present  era  came  into  operation  it  soon  become 
evident  that  longer  and  more  accurately  located  spirals  are  necessary  for  safety  and 
comfortable  riding  trains.  The  revision  of  the  matter  in  the  Manual  as  submitted  last 
year  was  intended  to  be  an  outline  of  the  method  for  calculating  and  staking  a  ten- 
chord  spiral  by  deflections,  given  step-by-step  so  that  it  could  be  more  readily  under- 
stood by  the  man  in  the  field  who  is  the  one  who  must  use  it. 

This  year's  report  is  intended  to  outline  the  staking  of  the  same  kind  of  spiral 
by  offsets,  followed  by  a  method  of  staking  a  spiral  of  somewhat  different  ratio  of 
curvature  wherein  the  offsets  are  calculated  for  such  points  along  the  curve  as  are 
desired.  In  the  second  method  the  values  of  X  for  each  of  the  desired  points  are 
assumed  and  the  offsets  calculated  for  each  point  assumed. 

Beginning  on  page  636  you  will  find  under  the  subheading  Staking  Spirals  by  Offsets: 

(Mr.  Baldridge  then  read  the  material  under  Staking  Spirals  by  Offsets  on  pages 
636  and  637,  calHng  attention  to  an  error  in  the  next  to  the  last  line  on  page  636, 
that  "chord  and  point"  should  be  changed  to  "chord  end  point".) 

Mr.  Baldridge:  The  formulas  are  given  on  page  637,  and  I  will  not  read  them. 
The  table  given  on  page  637  is,  in  fact,  a  two-column  table,  the  word  Elevation  having 
been  omitted  above  the  word  Inches  in  the  first  column.  The  third  and  fourth  column 
and  fifth  and  sixth  columns  are  actually  a  continuation  of  the  first  but  are  put  in 
the  present  position  to  save  space  in  printing. 

The  use  of  this  method  does  not  give  identically  the  same  curve  as  the  curve  that 
was  given  last  year,  and  the  two  methods  are  not  interchangeable  in  the  same  piece  of 
work,  but  each  one  will  give  very  nearly  the  same  result  finally. 

The  committee  recommends  that  the  matter  now  in  the  Manual,  page  S-26  begin- 
ning with  "Staking  Spirals  by  Offsets"  and  ending  on  page  S-27  with  "Staking  Spirals 
by  Deflections"  be  withdrawn  and  that  the  matter  which  I  have  just  read  to  you,  be 
adopted  for  inclusion  in  the  Manual  and  inserted  following  the  matter  which  is  now 
on  page  5-28. 

I  move  that  this  deletion  and  substitution  be  made. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Am:  That  concludes  the  report. 

Vice-President  Clarke:  I  know  personally  this  is  one  of  the  hard  working  com- 
mittees of  the  Association.  It  has  presented  a  comprehensive  and  excellent  report.  If 
there  is  no  discussion,  the  committee  is  excused  with  the  thanks  of  the  Association. 


Discussion 845 

Discussion  on  Ties 

(For  Report,  see  pp.  485-487.) 

(Vice-President  Clarke  in  the  chair.) 

Chairman  John  Foley  (Pennsylvania);  Committee  3  presents  no  statements  in 
reference  to  Assignments  1,  3  and  6.  For  your  information  only  there  are  presented 
statements  on  the  other  assignments. 

In  connection  with  Assignment  2,  your  attention  is  called  to  statements  in  a  recent 
address  by  a  railroad  executive,  who,  after  citing  "features  of  maintenance  which 
contribute  to  a  maximum  life  for  crossties  and  to  substantial  economies  in  tie  renewals 
and  other  maintenance  costs",  said  "all  of  these  efforts  would  have  only  limited  value 
unless  we  can  use  the  best  obtainable  material",  and  "here  we  meet  the  question  of 
inspection.  I  am  sorry  to  say  that  this  question  does  not  always  receive  the  preferred 
consideration  which  it  merits."  He  continued  that  on  his  railroad  "inspection  is  inspection 
and  in  the  full  meaning  of  that  word." 

The  general  adoption  of  that  attitude  toward  the  acceptance  of  ties  has  been  the 
hope  of  the  Committee  on  Ties  during  16  years  of  commenting  on  adherence  to  AREA 
specifications.  We  realize  that  absolute  accuracy  is  impossible  in  the  inspection  of 
ties.  We  expect  only  that  all  railroads  adhere  to  the  standard  as  successfully  as  so 
many  have  proved  they  can.  We  are  glad  to  acclaim  those  of  you  who  have  brought 
about  the  betterment  in  the  quality  and  size  of  ties  generally  by  your  accepting  as 
constructive  the  critical  comments  of  the  Committee  on  Ties  and  bringing  your  speci- 
fications and  inspection  into  conformance  with  AREA  recommended  practice. 

Our  observations  have  made  clear  that  adherence  to  the  specifications  on  paper 
does  not  assure  suitable  ties.  Mere  adoption  of  the  standard  is  not  enough.  The 
results  of  the  application  of  the  specification  for  crossties  in  actual  practice  were  sought 
by  your  committee  in  order  to  point  out  possible  improvements. 

A  summary  of  the  committee  observations  to  date  will  be  presented  by  Mr.  W.  D. 
Simpson,  chairman  of  the  subcommittee  on  Assignment  2,  who  will  also  comment  on 
the  1940  statement. 

W.  D.  Simpson  (Seaboard  Air  Line);  Observations  to  determine  the  extent  of 
adherence  to  the  specifications  for  crossties  began  in  1925.  They  have  been  made 
annually  since,  except  in  1927,  1931,  1932  and  1933.  During  the  13  years  of  field  work, 
20  trips  have  been  made  to  37  points  where  42  seasoning  yards  are  located.  Return 
trips  have  been  made  to  14  of  these  yards.  The  ties  observed  have  belonged  to  43 
railroads,  15  of  which  were  visited  more  than  once.  The  number  of  ties  observed 
total  33,500,000.  The  producing  territories  represented  by  the  ties  looked  at  extend 
from  Maine  to  Minnesota,  inclusive,  south  to  the  Gulf  of  Mexico,  plus  Oklahoma 
and  Texas. 

On  its  first  inspection  trip  (1925),  which  covered  3,000,000  ties  of  15  railroads,  the 
committee  found  and  informed  you  that  ties  conforming  fully  to  the  Association's 
specifications  were  being  produced  in  quantity,  and  that  on  some  railroads  all  ties 
fully,  or  satisfactorily,  met  the  requirements  of  the  AREA  standards,  but  that  on  some 
railroads  such  was  not  the  case. 

That  report  also  said  that  "interest  in  the  character  of  the  ties  delivered  on  the 
part  of  those  responsible  for  their  use  would  correct  much  of  the  fault  in  the  procure- 
ment of  ties."  Evidence  of  increased  interest  in  ties  is  found  in  the  subsequent  reports, 
which  generally  record  improvement  in  conditions  as  a  whole.  The  committee  gets 
considerable   satisfaction    from   the   evidence   of   the   better   inspection   noted   on   return 


846 Ties 

visits  to  some  yards,  and  derives  real  pleasure  from  seeing  a  lot  of  excellent  ties  in  a 
yard  where  housekeeping  approximates  what  it  should  be. 

Where  there  is  laxity  in  inspection  it  is  usually  characterized  by: 

1.  Oversizing:  In  that  case  we  pay  for  a  size  we  do  not  get. 

2.  Accepting  decay  and  excessive  split:  In  that  case,  the  deterioration  of  the  tie 
has  started  before  we  buy  it  at  the  price  for  a  solid,  sound  tie;  and 

3.  Improper  storage:  In  that  case  we  prevent  satisfactory  seasoning,  promote  decay, 
increase  splitting,  and  induce  conditions  which  result  in  the  loss  of  many  years  of 
tie  life. 

The  committee  repeats  its  suggestion  of  15  years  ago,  that  you  inquire  into  the 
quality  of  the  inspection  of  the  ties  on  your  property.  If  you  find  it  good,  commend 
those  responsible  for  it;  if  not,  do  something  toward  securing  full  adherence  to  AREA 
standards. 

The  record  of  our  1940  observations  is  marred  only  by  the  fact  that  one  railroad 
accepted  substandard  ties  and  another  permitted  substandard  stacking,  as  you  will  see 
by  reference  to  the  report  on  page  485,  which  also  points  out  that  the  wider  spacing 
of  seasoning  ties  which  is  practiced  in  some  yards  does  not  cause  more  splitting  than  the 
closer  spacing  commonly  used. 

This  report  is  offered  as  information. 

Chairman  Foley:  The  report  on  Assignment  4,  Tie  averages  and  costs  per  main- 
tained mile,  was  pubHshed  in  the  June-July  Bulletin  and  is  not  repeated  in  full.  You 
will  find  the  detailed  figures  in  that  bulletin. 

The  last  statement  we  wish  to  make  is  on  Assignment  5,  Investigate  and  report 
on  the  dimensions  of  ties,  and  bring  up  to  date  the  information  in  the  1924  and  1932 
Proceedings.  The  committee  is  launching  a  recommendation  that  warrants  very  full 
consideration  and  discussion.  The  facts  in  connection  with  it  will  be  presented  by  the 
chairman  of  the  subcommittee,  Mr.  W.  J.  Burton. 

W.  J.  Burton  (Missouri  Pacific) :  For  several  years  the  subject  of  tie  dimensions 
has  been  assigned  to  your  committee  and  special  attention  has  been  given  to  tie  length. 
Previous  reports  have  shown  the  desirability  of  longer  ties  and  have  presented  informa- 
tion as  to  what  was  involved  in  making  a  change. 

Realizing  the  importance  of  the  change  in  a  standard  so  long  in  effect,  your 
committee  is  presenting  proposed  recommendations  for  further  discussion  during  the 
ensuing  year,  with  the  idea  that,  unless  this  discussion  brings  up  some  unexpected 
objections,  the  recommendations  will  be  offered  for  adoption  next  year. 

The  committee  expects  to  recommend  the  following  for  adoption  and  publication 
in  the  Manual: 

(a)  The  adoption  of  nine-foot  ties  and  the  discontinuance  of  the  purchase  of 
eight-foot  ties  as  rapidly  as  practicable  and  economical. 

(b)  The  use  of  nine-foot  ties  at  least  for  lines  of  heavy  traffic. 

(c)  The  adoption  of  the  nine-foot  length  whenever  change  is  made  from  the 
eight-foot  length. 

These  recommendations  are  based  on  the  studies  of  the  committee  as  reported  in 
recent  years.  I  will  briefly  review  the  considerations  justifying  them. 

It  is  a  fact  that  the  economically  best  dimensions  for  a  crosstie  cannot  be  deter- 
mined solely  by  a  consideration  of  stresses;  in  other  words,  a  tie  cannot  be  designed 
in  the  sense  that  a  bridge  beam  may  be  designed  to  carry  a  given  load.  But  it  is 
necessary  to  have  standard  dimensions  for  ties  even  though  there  is  wide  variation 
from  tie  to  tie  in  the  strength  of  the  wood  and  in  the  character  and  amount  of  support. 


D  i  s  c  u  s  si  o  n 847 

The  observed  results  in  track,  therefore,  become  of  great  importance  in  selecting  the 
most  suitable  dimensions. 

It  is  well  known  that  if  ties  are  tamped  for  their  full  length,  the  track  tends 
to  become  center-bound,  and,  in  order  to  avoid  center-bound  track  it  is  the  universal 
practice  not  to  tamp  a  portion  of  the  ties  at  the  center  of  the  track. 

This  tendency  of  track  to  become  center-bound  is  an  indication  that  with  ties 
of  usual  length,  there  is  more  support  inside  than  outside  of  the  rails  or,  in  other  words, 
that  the  ties  are  too  short.  The  untamped  portions  of  the  ties,  and  the  ballast  under 
these  portions,  are  therefore  wasted  as  far  as  furnishing  support  is  concerned. 

If  each  part  of  the  length  of  a  tie  were  equally  effective  in  transmitting  load  to 
the  ballast,  the  proper  action  might  be  secured  by  making  the  tie  length  twice  the 
center-to-center  of  rail  distance,  so  as  to  have  as  much  support  outside  of  the  rails 
as  between  them.  However,  it  was  shown  by  Dr.  Talbot,  early  in  the  work  of  the 
Stresses  in  Track  committee,  that  under  the  vibratory  conditions  of  actual  service 
in  track,  it  is  not  possible  to  maintain  effective  ballast  tamping  at  the  ends  of  the  ties 
or  for  several  inches  in  from  the  ends.  If  the  ineffective  length  is  taken  at  four  inches 
at  each  end,  the  required  tie  length  for  standard  gage  and  131 -lb.  rail  figures  out 
10  ft.  7  in.  Assuming  that  a  tie  of  this  length  had  sufficient  beam  stiffness,  it  might  be 
tamped  for  its  entire  length  without  danger  of  center-bound  track. 

At  this  point  the  questions  of  cost  and  practicability  must  be  considered.  An 
increase  in  length  of  lYz  ft.  over  present  practice  is  out  of  the  question  for  reasons  not 
necessary  to  develop  here.  Your  committee,  however,  has  considered  the  practicability 
of  increasing  tie  length  to  nine  feet  and  it  should  be  pointed  out  again  that  a  given 
increase  in  tie  length  allows  double  that  increase  in  the  permissible  tamped  length  of  the 
tie.  Thus,  increasing  the  length  of  the  tie  6  in.  adds  12  in.  to  the  effective  support. 

Observations  over  a  considerable  period  of  years,  supplemented  by  opinions  secured 
from  tie  producers  and  from  national  forest  supervisors  support  the  conclusion  that 
relatively  few  trees  as  now  cut  for  crossties,  would  not  make  as  many  ties  six  inches  or 
a  foot  longer  as  they  now  make  of  the  shorter  lengths.  Also,  many  of  the  elements 
going  to  make  up  complete  tie  costs  are  either  unaffected,  or  only  slightly  affected  by 
the  proposed  changes  in  length. 

These  conclusions  are  supported,  at  least  partly,  by  a  study  of  the  present  regional 
practices  as  to  length  as  reported  in  our  1940  report.  There  it  was  shown  that  the 
choice  as  between  8-ft.  and  8J^-ft.  ties  was  apparently  a  matter  of  precedent  in  the 
particular  region.  It  is  a  fact  that  in  a  region  where  the  standard  length  is  8  ft.  6  in. 
a  premium  will  be  asked  for  8-ft.  ties.  The  most  important  elements  of  cost,  affected 
by  length  increase,  are  freight,  due  to  increased  weight,  preservative  and  cost  of  treat- 
ment. The  increase  in  amount  of  preservative  is  somewhat  less  than  that  proportional 
to  increased  length  due  to  a  greater  absorption  and  retention  near  the  ends  of  the  ties. 
The  increased  cost  of  treating  is  largely  due  to  fewer  trams,  usually  one,  which  can  be 
placed  in  a  cylinder  for  treatment. 

In  comparing  costs  of  different  lengths  of  ties  it  is,  of  course,  proper  to  compare 
total  cost  in  track  rather  than  merely  first  cost  of  the  tie.  We  have  previously  reported 
that  the  increased  cost  of  V/z-W..  ties  over  8-ft.  ties  may  be  as  much  as  S  percent  of 
the  total  cost  in  track  and  a  similar  figure  would  apply  to  the  change  from  8J^-ft.  to 
9-ft.  ties.  However,  such  percentages  would  apply  only  where  most  or  all  of  the  tie 
buyers  in  a  given  region  made  the  change  at  the  same  time. 

It  is  because  of  the  great  desirability  of  concerted  action  on  the  part  of  all  rail- 
roads that  we  are  proposing  adoption  of  these  recommendations.  As  we  have  previously 


S48 Stresses   in    Railroad    Track 

pointed  out,  more  additional  track  support  can  be  purchased  through  increased  tie 
length  than  through  other  means. 

It  is  expected  that  during  the  ensuing  year  this  subject  of  tie  length  and  the  proposed 
Manual  recommendation  will  be  subjected  to  full  discussion  and  criticism.  The  change 
is  not  only  very  important  to  the  railroads  but  one  in  which  concerted  action  is  most 
desirable.  It  is  for  this  reason  that  we  are  inviting  a  full  year  of  discussion  and  criticism 
before  Manual  action. 

The  committee  invites  discussion  orally  at  this  time  and  in  writing  during  the  year. 

Vice-President  Clarke:  The  report  at  the  present  time  will  be  accepted  as  infor- 
mation. 

Chairman   Foley:  That   completes   the  report. 

Vice-President  Clarke:  This  committee  is  doing  very  constructive  work  and  is  to  be 
complimented.  If  there  is  no  discussion,  the  committee  will  be  excused  with  the  thanks  of 
the  Association.   (Applause) 

Discussion  on  Stresses  in  Railroad  Track 

(For  Report,  see  pp.   7S3-7S7  and   759) 

Vice-President  Clarke  (in  the  chair) :  Dr.  Talbot,  we  wish  to  convey  to  you  our 
appreciation  for  the  many  years  of  invaluable  service  which  you  have  rendered  this 
Association,  the  railroads  of  the  continent  and,  in  fact,  of  the  world  in  advancing  our 
knowledge  in  regard  to  the  behavior  of  railroad  tracks  under  load. 

Past  President  Yager  has  had  the  privilege  of  serving  with  Dr.  Talbot  for  a  number 
of  years  on  this  important  committee,  as  vice-chairman,  and  I  will  ask  him  to  express, 
better  than  I  can,  our  appreciation  of  Dr.  Talbot's  work. 

Louis  Yager  (Northern  Pacific) :  We  believe  it  is  fitting  that  we  pause  in  the 
convention  deliberations  to  recognize  the  passing  of  another  milepost  in  the  progress  of 
our  Association  affairs. 

It  is  with  regret  that  it  is  necessary  to  announce  that  this  has  been  the  last  formal 
appearance  of  Dr.  Talbot  before  this  body  as  chairman  of  the  Committee  on  Stresses 
in  Track  which  he  created  and  directed  with  such  great  distinction  for  a  period  of  more 
than  a  quarter  of  a  century.  That  fact  has  given  the  officers  of  your  Association  con- 
siderable concern.  It  is  with  some  degree  of  assurance  that  we  proceed,  because  of  the 
fact  that  Dr.  Talbot  will  be  available  to  the  committee  and  offer  his  advice  in  delibera- 
tions of  that  group  of  men  who  will  continue  the  work  from  here  on. 

The  fact  that  Dr.  Talbot  is  retiring  from  the  carrying  of  his  weighty  duties  in 
the  manner  in  which  he  has,  is  an  illustration  of  the  true,  democratic  character  of  our 
Association.  We  assume  these  duties  voluntarily,  and  we  relinquish  them,  likewise,  volun- 
tarily when  we  believe  we  have  served  our  purpose. 

The  unselfish  devotion  of  such  men  as  Dr.  Talbot,  serving  without  monetary  com- 
pensation, is  one  of  the  outstanding  examples  of  professional  service  in  the  pubhc  inter- 
est, which  represents  the  voluntary  contributions  of  time  and  talent  by  gifted  men  and 
women  trained  in  the  physical  and  social  sciences  to  create  and  sustain  our  cherished 
ideals  of  American  democracy. 

The  intellectual  attainments  and  the  quality  of  service  rendered  in  the  engineering 
profession  have  been  an  inspiration  to  those  of  our  members  who  are  fortunate  enough 
to  have  been,  during  the  more  impressionable  periods  of  hfe,  students  under  Dr.  Talbot 
at  the  University  of  Illinois.  We,  who  have  been  privileged  to  have  contact  with  Dr. 
Talbot  in  his  great  contribution  to  the  research  aspects  of  railway  engineering,  are  proud 


Discussion 849 

to  arknowIedRf  our  student  relationship  to  him  in  what  we  have  perhaps  hoastfully 
regarded  as  the  post-graduate  phase  of  our  professional  development.  Men  of  the  type 
of  Dr.  Talbot,  in  collaboration  with  the  engineers  engaged  in  the  railroad  industry  early 
in  the  career  of  our  Association,  set  up  those  standards  of  accomplishment  which  have 
given  professional  standing  to  our  Association. 

The  work  of  the  Stresses  in  Track  Committee  afforded  the  first,  unqualified  recog- 
nition of  the  fact  that  the  Association,  by  reason  of  talent  and  professional  outlook 
was  qualified  to  undertake  and  prosecute  research  work  of  the  highest  order. 

If  we  are  mindful  of  the  fact  that  there  is  no  immediate  or  distinct  line  of  demar- 
cation between  the  periods  which  I  shall  mention,  then  it  may  be  correctly  said  that 
in  the  42  years  of  existence  of  our  Association,  Dr.  Talbot  has  served  three  generations. 
The  first  generation,  comprising  the  founders  and  the  pioneers  who  have  passed  beyond 
or  have  retired  from  active  duty,  were  those  men  of  our  profession  who  recognized 
early  that  there  were  many  problems  facing  our  group  which  were  beyond  the  possi- 
bility of  solution  through  the  usual  analytical  approach  and,  therefore,  required  the 
application  of  scientific  laboratory  methods.  The  leaders  and  officers  of  our  Association 
at  that  time,  in  looking  about  for  someone  to  undertake  the  work  of  finding  a  rational 
solution  for  many  of  our  track  problems,  selected  Dr.  Talbot  because  of  the  fact  that  by 
that  time  he  had  already  made  a  name  for  himself  through  original  work  in  the  appli- 
cation of  laboratory  methods  and  the  development  of  those  lines  of  investigation 
approach  which  have  become,  in  more  recent  years,  commonly  accepted  as  research 
work. 

Now,  then  the  second  generation,  to  which  we  belong,  perhaps  have  been  the  greatest 
beneficiaries  of  the  work  of  Dr.  Talbot,  and  it  is  to  us  that  he  has  opened  up  and 
expanded  the  horizon  of  what  is  still  possible  of  accomplishment  in  this  field  in  which 
he  has  done  such  great  pioneering  work. 

Then  we  come  to  that  third  generation  of  younger  men  who,  some  of  them  I 
know,  with  awe  and  respect,  have  stood  on  the  sidelines  and  have  attempted  to  appraise 
the  work  that  is  represented  by  the  contributions  made  by  Dr.  Talbot.  That  group  of 
men  have,  to  some  extent,  and  are  still  serving  an  apprenticeship  and  will  soon  take 
our  places  and  carry  on. 

The  several  engineering  professions,  including  our  own,  the  scientific  associations 
and  the  teaching  profession  have  already  given  acknowledgment  to  Dr.  Talbot  through 
the  election  to  high  office  and  through  formal  public  recognition  of  his  high  standing 
and  accomplishments  as  a  scientist,  an  engineer  and  a  research  director  and,  last  but 
not  least,  as  an  outstanding  educator  wherein  the  high  order  of  personal  character  has 
been  an  inspiring  influence  to  students  and  co-workers  alike. 

It  has  been  particularly  gratifying  to  us  that  it  has  been  possible  to  make  these 
public  acknowledgments  throughout  the  long  and  useful  career  and  to  add  an  expres- 
sion of  our  affectionate  regard  while  the  recipient  was  still  engaged  in  productive  effort, 
and  in  the  possession  of  full  mental  vigor. 

Dr.  Talbot  has  created  for  himself  in  this  outstanding  research  work  an  enduring 
memorial  to  be  found  in  the  records  of  all  scientific  libraries,  to  serve  as  a  guide  to 
the  succeeding  generations  of  research  workers  in  this  field. 

So,  we  are  not  proposing  to  duplicate  the  former  public  recognition  of  those  ac- 
complishments but,  rather,  to  make  this  particular  occasion  the  starting  point  of  another 
type  of  appreciation. 

It  therefore  seems  highly  appropriate  to  acknowledge  in  a  formal  manner  the  closing 
of  the  unique  period  of  the  first  and  only  Chairman  of  the  Stresses  in  Track  Committee 


850 Rail 

extending  over  a  period  of  21  years,  through  providing  an  appropriate,  permanent 
tribute  at  Dr.  Talbot's  Alma  Mater  where  he  labored  for  so  many  years  to  bring  about 
those  professional  achievements,  which  we  are  pleased  to  proclaim. 

It  therefore  gives  us  a  great  sense  of  satisfaction  to  be  able  to  announce  to  you 
at  this  time  that,  in  view  of  the  fact  that  Dr.  Talbot  has  resigned  his  commission, 
arrangements  are  being  made  for  a  suitable  permanent  tribute  expressing  the  apprecia- 
tion of  the  Association,  and  that  we  are  the  donors  and  the  University  of  Illinois  will 
be  the  custodian  of  that  perpetual  tribute.  This  tribute  is  to  be  located  in  the  Arthur 
Newell  Talbot  Laboratory  at  the  University  of  Illinois.  At  a  later  time  we  will  announce 
to  you  the  date  and  the  character  of  the  ceremonial  arrangements  which  will  complete 
the  dedication  of  that  permanent  tribute.   (Applause) 

Vice-President  Clarke:  Dr.  Talbot  and  members  of  the  Committee  on  Stresses  in 
Railroad  Track:  In  excusing  the  committee  for  the  last  time  I  again  wish  to  express 
to  you  our  depth  of  gratitude  for  the  great  piece  of  work  which  you  have  done.  The 
committee  is  excused  with  the  thanks  of  the  Association. 

Discussion  on  Rail 

(For  Report,  see  pp.  639-679.) 

(Vice-President  Clarke  presiding) 

Chairman  W.  H.  Penfield  (Chicago,  Milwaukee,  St.  Paul  &  Pacific):  During  1940 
the  committee  lost  three  of  its  members.  Chairman  John  V.  Neubert  who  died  June  4, 
1940;  Vice-Chairman  Robert  Faries  who  died  on  September  8,  1940,  and  former  Vice- 
Chairman  August  F.  Blaess  on  February  19,  1940.  The  loss  of  these  members  is  keenly 
felt  by  the  committee,  and  resolutions  showing  the  respect  in  which  these  members 
were  held  by  their  associates  appear  on  page  640. 

Eight  subjects  were  assigned  to  the  committee  for  1940.  Under  the  Revision  of 
Manual  we  are  offering  two  recommended  changes.  Reports  of  all  other  subjects  are 
presented   as    information    only. 

Late  in  the  season  a  ninth  subject  was  assigned:  Corrugated  rail,  causes  and  remedy. 
Effect  upon  riding  qualities  of  tracks  and  upon  the  costs  of  track  and  equipment  main- 
tenance. We  are  perfecting  an  organization  for  this  study  but  have  no  report  to  make 
at  this  time. 

I  will  now  ask  Mr.  C.  B.  Bronson,  our  vice-chairman,  to  present  our  recommendations 
for  revision  in  the  Manual. 

C.  B.  Bronson  (New  York  Central):  Revisions  are  requested  this  year  in  the 
forms  for  reporting  rail  failures  and  transverse  fissure  rail  failures.  It  is  recognized  there 
is  certain  non-essential  information  in  those  two  forms.  To  bring  them  up  to  date,  they 
and  also  the  instructions  that  go  with  them  have  been  revised. 

We  recommend  the  adoption  of  these  revised  forms  and  their  substitution  for 
those  now  in  the  Manual.  I  so  move. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Penfield:  Our  second  assignment  covers:  Further  research,  including  details 
of  mill  practice  and  manufacture  as  they  affect  rail  quality  and  rail  failures,  giving  special 
attention  to  transverse  fissure  failures  and  other  defects  in  the  head,  web  and  base, 
collaborating  with  Rail  Manufacturers'  Technical  Committee.  Mr.  H.  F.  Moore,  research 
professor  of  engineering  materials  at  the  University  of  Illinois,  who  base  been  in  charge 
of  the  investigations,  has  compiled  a  seventh  progress  report  of  the  Joint  Investigation 
of  Fissures  in  Railroad  Rails,  giving  a  resume  of  the  work  and  accomplishments  to  date. 
This  is  published  in  full  beginning  with  page  681. 


Discussion  851 


This  investigation  was  started  January  1,  1931  and  has  established  the  following 
facts: 

Shatter  cracks  in  rails  developed  during  manufacture  are  the  major  cause  of 
interior  transverse  fissures. 

Heavy  wheel  impacts  are  an  important  factor  in  causing  shatter  cracks  to  develop 
into  fissures.  Laboratory  studies  show  that  fissures  can  be  developed  in  shatter-cracked 
rails  under  repeated  wheel  loads  of  40,000  lb.  or  more. 

Field  checks  indicate  that  at  equivalent  wheel  loads  of  this  magnitude  fissures  are 
developed  by  one  wheel  in  500  to  600. 

Shatter  cracks  can  be  prevented  by  thermal  treatment  of  rails  after  rolling,  and  as 
a  result  of  this  investigation  thermal  treated  rails  are  now  commercially  produced.  A  few 
fissures  have  been  found  in  thermal  treated  rail,  but  in  all  cases  these  have  been  shown 
to  have  developed  from  inclusions  and  not  from  shatter  cracks. 

At  the  close  of  Committee  4  report,  Professor  Moore  will  give  an  oral  presentation 
of  the  work  of  the  Rails  Investigation  party. 

Assignment  3,  Compilation  of  statistics:  Mr.  W.  C.  Barnes,  engineer  of  tests,  is 
chairman  of  the  subcommittee,  and  I  will  ask  him  to  present  the  report. 

W.  C.  Barnes  (American  Railway  Engineering  Association) :  The  rail  failure  sta- 
tistics, page  645,  were  prepared  in  the  same  manner  as  those  presented  last  year.  The 
rail  tonnages  reported  exceed  those  of  last  year  by  over  213,000  tons.  Your  attention  is 
called  to  Table  1  which  shows  that  the  1934  rollings,  which  five-year  period  of  obser- 
vations is  now  concluded,  had  a  failure  rate  of  100  track  miles  of  35.8,  which  is  the 
lowest  on  record,  the  nearest  approach  to  that  being  a  rate  of  60  for  the  1930  rollings. 

The  returns  so  far  recorded  for  the  1935  to  1938  rollings,  which  have  not  yet, 
of  course,  completed  the  five-year  period,  indicate  that  they  will  also  give  a  good 
performance  record. 

Fig.  2  on  page  647  shows  that  each  mill  contributed  in  establishing  this  record. 
The  remainder  of  the  report  requires  no  special  comment,  and  the  statistics  are  presented 
as  information.  ,^  *»»^'liiM 

Transverse  Fissure  Failures:  Transverse  fissure  statistics  for  the  year  ended  Decem- 
ber 31,  1939  are  shown  on  page  650.  The  increase  in  fissure  failures  in  1939  over  1938 
is  an  unwelcome  though  not  unexpected  development.  Despite  the  removal  of  1,398  more 
detected  fissured  rails  in  track  in  1939  than  in  1938,  there  were  1,575  more  service 
failures.  As  will  be  seen  from  Fig.  1  on  page  652,  the  1939  service  failures  were  exceeded 
only  in  1936  and  1937.  These  statistics  are  presented  as  information. 

Controlled-cooled  and  Brunorized  rail:  Data  are  being  accumulated  to  assist  in 
determining  the  performance  in  service  of  controlled-cooled  and  Brunorized  rail  rolled 
under  contract.  The  total  tonnages  now  under  consideration  are  3,022,206  of  controlled- 
cooled  rail  and  123,873  of  Brunorized.  The  failures,  classified  as  to  type,  appear  on 
Table  2. 

As  Mr.  Penfield  said  a  few  moments  ago,  no  transverse  fissure  failures  originating 
from  shatter  cracks,  which  these  special  processes  are  intended  to  prevent,  have  occurred 
in  controlled-cooled  rail  nor  in  Brunorized  rail  rolled  by  the  revised  process. 

This  report  is  presented  as  information. 

Chairman  Penfield:  Our  assignment  No.  4  is:  Study  the  cause  and  prevention  of 
rail  battering  and  methods  of  reconditioning  rail  ends.  Mr.  F.  M.  Graham,  assistant 
engineer  of  standards,  Pennsylvania  Railroad,  the  subcommittee  chairman  will  present 
the  report. 


.A[ 


852 Rail 

(F.  M.  Graham,  Pennsylvania,  read  the  report  on  Assignment  4  on  page  658, 
calling  attention  to  the  fact  that  the  first  line  should  read  "Subcommittee  4"  in  place 
of  "Subcommittee  6".) 

Mr.  Graham:  I  might  add  that  since  this  was  prepared,  the  committee  has  selected 
a  site  on  the  R.  F.  &  P.  Railroad.  Of  course,  anyone  caring  to  visit  the  installation  of  this 
test  can  do  so.  It  will  start  on  May  5,  1941  and  continue  through  that  week. 

This  is  submitted  as  a  progress  report,  and  it  is  recommended  that  the  subject  be 
continued. 

Chairman  Penficld:  Assignment  5  is:  Economic  value  of  different  sizes  of  rail. 
Mr.  J.  M.  Farrin,  special  engineer,  Illinois  Central  Railroad,  is  the  subcommittee  chair- 
man and  will  present  the  report. 

J.  M.  Farrin  (Illinois  Central):  The  work,  of  this  subcommittee  during  the  past 
year  has  been  directed  towards  the  confirmation  of  the  accuracy  of  the  expense  ratios 
of  the  different  sizes  of  rail  that  were  established  in  preceding  years  by  means  of  their 
mathematical  properties  that  affect  track  performance. 

The  theory  of  the  expense  ratio  method  is  predicated  on  the  assumption  that  the 
minimum  size  of  rail  is  to  be  determined  from  viewpoint  of  safety.  With  the  minimum 
size  known  and  expense  ratios  of  the  different  sizes  of  rails  established  and  costs  known 
for  any  particular  size  of  rail  in  a  given  location,  then  the  cost  of  any  other  weight  of 
rail  can  be  quickly  determined  for  the  same  location  and  the  traffic  density  by  means 
of  the  simple  proportion  of  their  ratios.  This  result  can  then  be  used  as  a  guide  in  forming 
a  conclusion  as  to  what  size  of  rail  best  suits  the  location  being  considered. 

As  one  of  the  means  of  checking  the  accuracy  of  the  ratios  tentatively  established, 
the  subcommittee  each  year  checks  the  maintenance  ratio  with  the  actual  performance 
of  the  test  sections  totaling  about  40  miles  in  length  established  by  the  Kan.sas  City 
Southern  Railway,  the  result  for  the  years  1938  and  1939  being  shown  on  page  659.  The 
apparent  discrepancy  for  the  127-lb.  rail  in  1939  is  probably  due  to  the  fact  that  the 
amount  of  money  spent  has  not  been  used  up,  and,  consequently,  has  not  been  averaged 
over  a  long  enough  time.  Otherwise  the  ratios  give  comparable  results. 

Also  opportunity  was  had  to  make  a  comparison  between  100-lb.  and  131-lb.  rail 
by  means  of  testimony  presented  before  a  congressional  committee  by  the  late  Robert 
Faries  of  the  Pennsylvania  Railroad.  The  occasion  of  this  testimony  was  to  show  what 
the  railroads  could  do  in  event  section  labor  wages  were  increased,  the  material  presented 
being  the  result  of  the  consolidated  judgment  of  the  maintenance  officers  of  about  100 
railroads.  It  is  to  be  noted  that  the  tentative  ratios  are  in  fair  agreement  with  the 
testimony. 

A  questionnaire  was  sent  out  to  all  members  of  the  rail  committee  requesting  their 
experience  in  tonnage  life  in  the  first  location  of  the  various  sizes  of  rail,  together  with 
man-hours  of  section  labor  expended  in  track  laying  and  surfacing.  These  replies  were 
plotted  and  found  on  the  average  to  produce  curves  approximately  parallel  to  those 
developed  in  the  tentative  report,  thus  indicating  the  approximate  correctness  of  the 
ratios  tentatively  established. 

This  report  is  presented  as  information  with  the  recommendation  that  the  subject 
be  continued. 

Chairman  Penfield:  Assignment  6  is:  Continuous  welding  of  rail,  collaborating  with 
Committee  5 — Track  and  Special  Committee  on  Stresses  in  Railroad  Track.  Mr.  J.  C. 
Patterson,  chief  engineer,  maintenance  of  way  of  the  Erie  Railroad  is  the  subcommittee 
chairman  and  will  present  the  report. 

(J.  C.  Patterson,  Erie,  read  the  first  three  paragraphs  under  Assignment  6  on 
page  660.) 


Discussion  853 


Mr.  Patterson:  The  report  is  submitted  as  information  with  the  recommendation 
that  the  subject  be  continued. 

I  think  Professor  Moore  has  a  few  remartcs  he  would  like  to  make. 

H.  F.  Moore  (University  of  IlUnois) :  Laboratory  experiments  reported  in  certain 
progress  reports  have  been  carried  on,  and  we  have  a  more  complete  report  of  the 
strength  of  various  welded  joints. 

At  present  we  may  say,  in  a  general  way,  the  electric  flash  weld,  the  oxy-acetylene 
heat  pressure  weld,  based  upon  resistance  to  wheel  load,  show  results  equal  and,  in 
some  cases,  superior  to  the  original  rail.  Based  upon  bending  moment,  they  show 
values  coming  around  90  percent  of  the  original  rail.  The  thermit  welds  show  values 
about  equal  to  those  of  carefully  applied  joint  bars  in  our  laboratory  tests.  Great  care 
was  given  that  the  bolt  tension  was  not  too  high,  and  that  it  was  kept  constant.  The  two 
fusion  weld  processes  show  results  far  below  joint  bars. 

Chairman  Penfield:  Our  next  assignment,  No.  7,  is:  Service  tests  of  various  types 
of  joint  bars.  Mr.  Ray  McBrian,  engineer  of  tests,  Denver  &  Rio  Grande  Western  Rail- 
road is  the  subcommittee  chairman  and  will  present  the  report. 

Ray  McBrian  (Denver  &  Rio  Grande  Western):  The  report  is  a  record  of  the 
observations  made  during  the  past  year  of  the  service  tests  of  the  various  types  of 
joint  bars  in  the, test  track  on  the  Santa  Fe  and  Pennsylvania  railroads.  It  is  to  be  noted 
that  details  as  to  rail  surface  profile,  joint  camber,  bolt  tension,  rail  gap  and  out-to-out 
measurements  are  given.  On  the  question  of  comparison  of  types  of  bars  installed  in  the 
test  tracks,  it  may  be  said,  except  for  one  design  of  bar,  the  bars  have  not  been  in 
track  long  enough  to  determine  their  relative  values. 

The  report  is  presented  as  information  with  the  recommendation  that  the  subject 
be  continued. 

Chairman  Penfield:  Our  next  assignment.  No.  8,  is:  Investigate  joint  bar  failures 
and  give  consideration  to  the  revision  of  design  and  specifications.  Mr.  Ray  McBrian 
is  also  the  subcommittee  chairman  of  that  subject  and  will  present  the  report.  I  would 
like  to  announce,  however,  that  at  the  close  of  Mr.  McBrian's  report,  Mr.  Walter  B. 
Leaf,  research  technician  of  the  Denver  &  Rio  Grande  Western  Railroad,  will  present 
an  ilustrated  monograph  on  photoelastic  investigations  of  the  design  of  joint  bars, 
which  I  am  sure  you  will  all  find  interesting.* 

Mr.  McBrian:  The  report  of  the  subcommittee  continues  the  study  from  last  year 
and  interprets  the  assignment  to  include  the  study  of  cracks  which  may  not  lead  to 
ultimate  breakage.  Through  observation  of  tests  in  progress  and  the  study  of  failures, 
data  were  obtained  bearing  on  some  of  the  theories  as  to  cause  of  failure.  It  is  noted 
that  the  data  were  obtained  from  actual  service  tests,  full  size  fatigue  tests  and  labora- 
tory studies  as  possible  means  to  eliminate  cracking.  Possible  means  studied  were: 

(1)  Improving  physical  properties; 

(2)  Photoelastic  studies  as  to  effect  of  design  and  bolt  tension; 

(3)  Fatigue  tests,  using  full  size  bars  in  assembled  joints; 

(4)  Observation  as  to  effect  of  saw  swelling  of  the  rail  end. 

Details  were  given  as  to  manner  in  which  these  tests  are  being  conducted.  The 
report  is  offered  as  information,  with  the  recommendation  that  the  subject  be  continued. 

Chairman  Penfield:   Mr.  Leaf,  are  you  ready  to  proceed? 

(W.  B.  Leaf,  Denver  &  Rio  Grande  Western,  gave  an  illustrated  talk.  See  page  672.) 

Chairman  Penfield:  Mr.  Leaf,  the  committee  is  very  much  indebted  to  you,  and 
we  would  like  to  thank  you  for  this  demonstration. 


See  monograph  by  Mr.  Leaf  on  page  672  of  the  committee's  report. 


854 Yards    and    Terminals 

Professor  Moore  will  now  close  the  committee  work  with  his  summarj'  of  the  more 
recent  activities  in  connection  with  the  rails  investigation. 

(For  Professor  Moore's  formal  report  for  the  year,  see  the  Seventh  Progress  Re- 
port of  the  Investigation  of  Fissures  in  Railroad  Rails,  page  681.) 

Vice-President  Clarke:  The  work  being  done  by  the  Rail  committee  is  of  great 
importance,  and  none  of  it  is  more  important  than  the  work  being  done  by  Professor 
Moore's  committee.  We  appreciate  very  much  the  report  which  he  has  just  presented. 

If  there  is  no  discussion,  the  committee  is  discharged  with  the  thanks  of  the  Asso- 
ciation. 

Discussion  on  Yards  and  Terminals 

(For  Report,  see  pp.  107-148.) 

(Vice-President  Bond  presiding) 

Chairman  C.  H.  Mottier  (Illinois  Central):  The  report  of  the  Yards  and  Terminals 
committee  embraces  reports  on  all  nine  assignments.  The  first  assignment  is  Revision 
of  Manual  and  will  be  presented  by  the  subcommittee  chairman,  Mr.  Lyford. 

L.  L.  Lyford  (Illinois  Central) :  This  year's  report  on  Revision  of  Manual  is  in 
three  parts:  First,  definitions;  second,  change  in  Manual  material  covering  freight 
terminals,  and,  third,  change  in  specifications  for  weighbeams  and  accessories  for  the 
four-section,  knife-edge  railway  track  scales,  the  two-section,  knife-edge  railway  track 
scales,  and  the  motor  truck,  built-in,  self-contained  and  portable  scales  for  railway 
service. 

(Mr.  Lyford  read  the  paragraphs  under  Glossary  found  on  page  108.) 

Mr.  Lyford:  The  reason  for  this  change  is  because  the  Manual  did  not  have  a 
definition  for  a  siding,  and  that  word  is  used  in  the  Standard  Code  of  Operating  Rules. 
I  move  that  this  material  be  approved  for  inclusion  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Lyford:  Under  the  second  portion,  Freight  Terminals,  it  is  proposed  to  delete 
paragraph  322  (e),  page  14-21  and  insert  in  its  place  the  following  paragraph. 

(Mr.  Lyford  then  read  the  proposed  new  paragraph  (e),  ending  with  the  text  under 
Departure  Tracks.) 

Mr.  Lyford:  The  purpose  of  these  changes  is  to  emphasize  the  desirability  of 
operating  trains,  wherever  possible,  direct  from  the  classification  yard  tracks.  There  is  a 
saving  in  the  handhng  of  cars  and  a  consequent  saving  in  the  cost  of  operation. 

I  move  that  this  new  material  be  approved  for  inclusion  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Lyford:  The  remaining  material  has  to  do  with  the  design  of  notches  and 
pawls  or  latches  on  the  different  types  of  scales  covered  by  the  specifications.  It  is 
proposed  in  each  case,  that  is,  for  the  three  types  of  scales,  to  delete  the  present 
paragraphs  on  Notches  or  Pawl  and  insert  in  their  place  the  following  paragraphs: 

(Mr.  Lyford  then  read  the  new  material  on  Notches  and  Pawl  or  Latch  on  page 
109.) 

Mr.  Lyford:  The  purpose  of  this  change  is  not  to  specify  with  a  great  degree  of 
exactness  just  how  these  notches  shall  be  made  but,  rather,  to  state  in  general  terms 
that  they  shall  be  made  so  that  accurate  positioning  of  the  poise  will  automaticallv  result 
at  any  graduation. 

I  move  that  these  changes  in  the  Manual,  which  are  the  same  for  the  three  types 
of  scales,  be  adopted  for  inclusion  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 


Discussion 855 

Chairman  Mottier:  Report  on  Assignment  2,  General  requirements  in  terminal 
facilities  for  various  later  types  of  equipment,  will  be  presented  by  the  subcommittee 
chairman,  Mr.  Giles. 

W.  H.  Giles  (Missouri  Pacific) :  For  the  purpose  of  this  report  later  types  of  equip- 
ment are  considered  to  be  the  so-called  streamline  passenger  cars.  Some  highlights  of  the 
study  are  set  forth,  with  the  conclusions  of  your  committee  as  outlined  on  page  111. 
The  report  is  submitted  as  information. 

Chairman  Mottier:  Report  on  Assignment  3,  Terminal  facilities  required  for  servic- 
ing electrical  and  air  conditioning  equipment  in  passenger  cars,  is  to  be  presented  by 
the  subcommittee  chairman,  Mr.  Hedley. 

W.  J.  Hedley  (Wabash):  This  report  deals  with  facilities  for  passenger  stations  and 
coach  yards  for  electrical  and  air  conditioning  equipment.  It  involves  two  closely 
related  subjects.  In  fact,  they  are  so  closely  related,  they  can't  very  well  be  separated 
because  there  is  a  great  deal  of  air  conditioning  equipment  that  requires  electric 
current  for  standby  use  while  it  is  idle  at  the  passenger  station  and  also  while  it  is 
in  the  coach  yard. 

This  report  shows  a  tabulation  on  page  113  of  Bulletin  421  of  the  number  of 
passenger  cars  equipped  with  the  various  types  of  air  conditioning  systems  during  the 
past  few  years.  The  tabulation  ends  with  the  year  1938  because  a  tabulation  of  the 
cars  equipped  with  these  systems  for  the  years  1939  and  1940  has  not  been  compiled. 
However,  the  AAR  compilation  of  air  conditioned  passenger  cars  in  operation  as  of 
January  1,  1941  shows  that  Class  I  railroads  had  6,961  cars,  which  was  an  increase  of 
365  over  the  previous  January  1,  1940,  report.  The  Pullman  Company  had  5,239  air 
conditioned  cars  in  operation,  which  was  an  increase  of  120,  making  a  total  for  Class  I 
railroads  and  the  Pullman  Company  of  12,200  cars,  an  increase  of  485. 

You  will  note  that  most  of  the  air  conditioning  of  passenger  cars  was  done  during 
the  years  1935,  '36  and  '37,  although  some  was  done  prior  to  that,  and  there  has  been 
some  since. 

The  first  consideration  for  one  who  is  to  decide  what  facilities  should  be  provided 
for  servicing  air  conditioning  equipment,  particularly,  is  to  determine  what  type  of 
air  conditioning  is  in  use  in  the  cars  that  arc  to  use  the  terminal. 

Then  the  next  consideration  is,  what  is  the  trend  in  the  use  of  the  air  conditioning 
systems.  Some  railroads  are  gradually  changing  from  one  type  or  system  to  another, 
so  it  is  important  to  know  what  types  of  air  conditioning  equipment  are  coming  into  the 
passenger  terminals  and  also  what  types  may  be  expected  during  the  next  few  years. 

For  servicing  electrical  equipment,  the  primary  need  is  for  a  method  of  charging 
storage  batteries.  That  is  necessary  usually  in  the  passenger  station  as  well  as  in  the 
coach  yard.  For  charging  batteries,  it  is  necessary  to  use  direct  current.  The  matter 
resolves  itself  into  a  question  of  whether  to  provide  direct-current  outlets  at  all  the 
places  that  you  will  need  them,  or  whether  to  use  portable  charging  units  which  arc 
commonly  known  as  buggies,  which  will  operate  from  220-volt  three-phase  a.c.  circuits, 
converting  that  into  the  necessary  voltage  of  direct  current. 

The   committee   proposes  to   continue   its   study   of   this  matter,   and   next  year   to 

determine  the   most   desirable  and   economical   spacing  of   electrical   outlets   to   be   used 

for  both   air   conditioning   and   electrical   equipment.  This   will   be   done  in   conjunction 

with  the  committee  of  the  Electrical  Section,  as  the  report  for  this  year  was  worked  out. 

This  report  is  submitted  as  information. 

Chairman  Mottier:  The  report  on  Assignment  No.  4,  Scales  used  in  railway 
service,  appearing  on  page  114,  will  be  presented  by  the  subcommittee  chairman,  Mr. 
Harrison. 


856  Yards   and   Terminals __^_ 

M.  J.  J.  Harrison  (Pennsylvania):  In  presenting  this  year's  report  under  this  par- 
ticular subject,  your  committee  has  been  informally  asked  how  it  happened  that  it 
apparently  departed  from  the  type  of  scale  which  was  ordinarily  thought  of  as  being 
used  in  railway  service.  By  way  of  explanation,  I  might  point  out  that  this  particular 
report  is  prepared  in  response  to  an  assignment  which  came  to  your  committee  from 
the  AAR.  The  reason  for  the  interest  of  the  AAR  in  this  particular  matter  is  that,  as 
a  matter  of  fact,  in  terminal  grain  markets,  not  only  the  buying  and  seUing  of  the 
grain  is  determined  on  scales  of  the  type  contemplated  by  the  material  presented 
here,  but  also  the  charges  made  for  its  transportation  from  point  of  origin  to  the 
terminal  market  and  sometimes  from  one  terminal  market  to  another. 

The  material  submitted  at  this  time  is  set  forth  purely  as  a  tentative  proposal. 
It  has,  since  the  bulletin  was  printed,  been  submitted  to  other  organizations  and  groups 
that  have  a  very  vital  interest  in  the  subject.  It  has  been  discussed  with  representatives 
of  those  groups.  Unless  there  be  objection,  your  committee  proposes  to  continue  that 
discussion  and,  when  possible,  to  report  further  with  regard  to  any  alterations  or  amend- 
ments which  may  be  indicated  as  being  desirable  in  the  light  of  all  of  the  discussions 
which  may  eventuate  with  the  other  parties  concerned  in  this  matter. 

Your  committee  would  be  particularly  happy  to  have  written  discussions  on  any 
of  the  detail  covered  by  this  report  from  anybody  who  is  interested  in  it,  and  particu- 
larly solicits  criticisms  of  its  material. 

At  this  time  the  report  is  submitted  as  information,  with  the  request  that  it  be 
so  received. 

Chairman  Mottier:  Report  on  Assignment  S,  Terminal  facihties  required  for  the 
care  of  Diesel  locomotive  equipment,  will  be  presented  by  the  subcommittee  chairman, 
Mr.  Lorenz. 

H.  C.  Lorenz  (Cleveland,  Cincinnati,  Chicago  &  St.  Louis) :  In  this  report  the 
committee  has  assembled  information  regarding  the  manner  in  which  the  railroads  are 
meeting  the  problem  of  providing  facilities  for  servicing  and  repairing  Diesel-electric 
locomotives.  More  definitely,  the  following  subjects  are  treated:  General  requirements 
for  ordinary  servicing;  facilities  for  light  or  running  repairs;  shops  for  heavy  repairs; 
truck  and  wheel  removing  equipment,  with  a  resume  of  what  the  railroads  are  doing 
in  particular,  in  the  way  of  adapting  and  supplementing  existing  facilities  and  the  con- 
struction of  new  facilities  and  an  outline  of  requirements  in  Diesel-electric  locomotive 
details  to  facilitate  repairs  under  given  circumstances. 

This  report  is  offered  as  information. 

Chairman  Mottier:  Report  on  Assignment  6,  Classification  yards,  will  be  reported 
by  the  subcommittee  chairman,  Mr.  George  Hand. 

G.  F.  Hand  (New  York,  New  Haven  &  Hartford) :  This  year  the  subcommittee 
has  studied  the  departure  end  of  the  classification  yard.  The  principal  purpose  was  to 
consider  the  design  of  classification  tracks  and  of  the  departure  tracks  in  relation  to 
the  method  of  operation,  with  the  object  of  expediting  freight  and,  at  the  same  time, 
reducing  the  cost  as  far  as  possible. 

The  point  of  principal  interest  in  the  findings  in  this  study  is  contained  in  para- 
graph 3  on  page  134.  This  has  been  covered  by  the  subcommittee  on  change  in  Manual, 
and  the  essence  of  that  will  be  included  in  the  Manual. 

The  main  thing  to  emphasize  is  that,  with  the  necessity  fur  quick  dispatch  of  trains 
at  a  minimum  cost,  it  has  become  more  and  more  the  practice  to  make  up  and  dispatch 
trains  from  the  classification  tracks  themselves.  The  need  for  departure  tracks  is  set  out 
in  a  later  paragraph  on  that  same  page. 


Discussion 857 

We  believe,  after  the  very  careful  canvass  we  have  made  of  all  the  principal  yards 
in  the  country  through  direct  contact  with  operating  men  as  well  as  with  our  own 
engineers,  that  under  existing  conditions  the  seven  points  listed  on  the  bottom  of  pages 
133  and  134  represent  good  practice.  The  report  is  submitted  as  information. 

Chairman  Mottier:  Report  on  Assignment  7,  Terminal  facilities  required  for  the 
washing  of  passenger  cars  mechanically:  Unfortunately,  Mr.  Metcalf  is  not  with  us  to 
present  the  report.  In  recent  years  bus,  street  car  and  interurban  companies  have  been 
using  mechanical  equipment  to  wash  their  cars.  Buses  have  been  doing  it  very  success- 
fully and  economically,  which  fact  suggested  this  assignment.  So  far  as  we  have  been 
able  to  learn,  there  are  only  two  railroads  in  this  country  that  have  adopted  mechanical 
washing  of  cars,  though  others  in  foreign  countries  are  doing  so.  One  American  road 
has  two  installations;  the  other  has  one.  They  appear  to  be  very  well  pleased  with 
their  performance  and  the  resulting  economies. 

The  equipment  used  in  washing  cars  consists  primarily  of  revolving  cylindrical 
brushes  which  bear  against  the  side  of  the  cars  and  are  subject  to  tipping,  so  they 
will  conform  to  the  profile  of  the  car.  Water  is  sprayed  onto  the  car  while  it  is  being 
moved  rather  slowly  through  the  washer.  In  the  modern  installations  equipment  is 
moved  through  at  the  rate  of  about  one  car  per  minute.  If  the  cars  can  be  moved 
through  these  washers  without  extra  switch-engine  expense  they  have  considerable 
promise  in  the  reduction  of  labor  .costs. 

Quite  a  number  of  studies  have  been  made  by  railroads  to  install  this  equipment, 
but  it  is  rather  difficult  to  do  so  in  an  old  layout.  It  is  almost  necessary  to  design 
a  yard  with  this  equipment  in  mind  to  get  the  full  advantage  of  it.  The  washer  should 
be  placed  on  a  tangent  track  where  cars  can  be  washed  as  they  are  moved  in  a  normal 
movement  between  the  station  and  the  yard.  The  new  equipment  can  wash  cars 
moving  in  either  direction. 

At  the  bottom  of  page  135  the  committee  cites  certain  advantages  claimed  for 
mechanical  car  washers.  These  washers  are  made  principally  by  two  American  com- 
panies. They  have  many  installations  for  buses  and  street  cars.  Several  desirable  features 
to  be  incorporated  in  installations  for  mechanical  washing  of  passenger  equipment  are 
also  presented. 

This  report  is  presented  as  information  and,  incidentally,  is  a  final  report  on  the 
assignment. 

The  report  on  Assignment  8,  Terminal  facilities  required  for  the  handling  of  high- 
way trucks  and  trailers  on  and  off  railroad  cars  will  be  presented  by  the  subcommittee 
chairman,  Mr.  Ripley. 

H.  L.  Ripley  (New  York,  New  Haven  &  Hartford) :  Looking  at  me  now,  it  would 
be  hard  for  you  to  believe  that  I  was  once  a  student,  but  I  remember  being  taught, 
in  connection  with  the  study  of  philosophy,  that  man  is  a  selfish  animal.  Of  course, 
there  are  exceptions  to  that  but,  speaking  of  mankind  in  general,  it  was  true  then  and 
it  is  true  now.  So,  if  you  want  to  find  a  way  to  get  back  onto  the  rails  some  of  the 
business  that  has  been  lost  to  rubber,  the  surest  way  to  do  it  is  to  find  something  that 
is  of  benefit  to  both. 

That  is  what  a  few  railroads  have  attempted  in  connection  with  this  subject. 
There  is  nothing  in  it  for  the  Manual,  and  perhaps,  after  you  read  it,  you  will  think 
I  should  have  said  there  is  nothing  in  it,  but  the  committee  is  hopeful  that  it  may 
offer  some  help  to  some  railroad  and  be  of  interest  and  perhaps  of  advantage  to  it 
and  to  the  railroads  in  general  in  making  a  study  of  the  subject  from  the  angle 
suggested. 


858 Records   and   Accounts 

Chairman  Mottier:  The  report  on  Assignment  9,  Bibliography  on  subjects  per- 
taining to  yards  and  terminals,  appearing  in  current  periodicals,  will  be  presented  by 
the  subcommittee  chairman,  Mr.  Tratman,  who,  incidentally,  is  the  patriarch  of  our 
committee  and,  outside  of  the  chairman,  is  the  most  modest  and  hardest  working  man 

on  the  committee He  does  not  think  it  necessary  for  him  to  present  the  report, 

which  demonstrates  that  he  is  modest.  The  report  is  presented  as  information  and  covers 
eight  pages  of  references  and  required  a  great  deal  of  work.  We  appreciate  Mr.  Trat- 
man's   effort. 

Mr.  Chairman,  that  concludes  the  report  of  the  Yards  and  Terminals  Committee. 

Vice-President  Bond:  Is  there  any  discussion?  If  not,  the  committee  is  excused 
with  the  thanks  of  the  Association.   (Applause) 

Discussion  on  Records  and  Accounts 

(For  Report,  see  pp.  369-392.) 

(Vice-President  Bond  presiding) 

Chairman  C.  A.  Knowles  (Chesapeake  &  Ohio):  Records  and  Accounts:  This  is 
not  the  dry  subject  those  words  would  seem  to  denote.  Records  used  in  the  conduct 
of  a  business  undertaking,  telling  the  story  of  success  or  failure,  are  vibrant  with  life. 
This  is  especially  true  of  the  railroad  industry,  with  properties  extending  over  hundreds 
and  thousands  of  miles,  with  daily  transactions,  multitudinous  daily  transactions  with 
the  public  and  with  each  other.  It  does  not  seem  too  much  to  say  that  the  present  stage 
of  efficiency  of  our  industry  has  been  reached,  to  a  great  extent,  through  the  prepara- 
tion and  study  of  records  that  indicate  to  proceed  with  caution  or  stop. 

It  was  called  to  my  attention  a  short  time  ago  that  a  man  had  said,  "I  am  a 
forward-looking  man.  I  am  not  concerned  with  things  of  the  past."  I  don't  think  he  really 
meant  that  because  no  man  could  successfully  chart  his  future  course  without  con- 
sideration of  the  past,  no  more  than  a  vessel  could  steam  towards  the  port  without  the 
rudder  traihng  in  the  wind  or  without  the  benefit  of  the  logs  of  navigators  long  since 
gone. 

A  striking  example  of  this  is  the  magnificent  accompHshment  of  Matthew  Fontaine 
Maury,  he  who,  through  the  study  of  the  logs  of  the  captains  of  sailing  vessels,  discovered 
to  the  lasting  benefit  of  future  navigators  that  the  currents  of  the  sea  follow  fixed 
paths.  Now,  in  its  practical  consideration,  are  the  railroads  today  about  to  save  over 
half  a  million  dollars  through  the  recent  discovery  of  records,  some  of  which  were  made 
seventy-five  years  ago.  It  is  safe  to  say  that  the  makers  of  those  records  had  no  idea 
of  the  beneficial  use  to  which  they  would  be  put  today,  and  neither  do  we  know  what 
use  our  successors  may  make  of  the  records  we  are  now  preparing.  It  is  our  duty  and 
our  privilege  to  so  prepare  the  records  that  they  clearly  and  fully  state  the  facts. 

No  doubt  many  of  you  have  a  question  in  your  mind  as  to  why  I  am  making 
these  remarks.  The  purpose  is  an  attempt  to  engage  your  interest  and  to  invite  dis- 
cussion on  the  subcommittee's  reports  which  are  to  follow. 

The  report  on  Assignment  No.  1,  Revision  of  Manual,  will  be  given  by  Mr.  Field, 
chairman  of  the  subcommittee. 

D.  E.  Field  (Columbus  &  Greenville):  It  has  just  been  said  that  records  and 
accounts  are  far  removed  from  the  grave,  but  I  still  suggest  that  this  particular  subject 
might  be  called  the  desert  surrounding  the  oases  formed  by  our  other  subcommittee 
reports.  But  it  is  the  purpose  of  our  subcommittee  that  the  Manual  shall  not  be  a 
burial  ground  for  conclusions  of  the  Association  which  have  become  obsolete  through 
changed  conditions. 


Discussion  859 

The  brief  paragraphs  printed  on  page  370  only  partially  indicate  the  amount  of 
time  and  thought  given  by  the  committee  during  the  past  year  to  a  review  of  the 
material  in  the  Manual,  contained  on  125  of  its  pages. 

The  necessity  for  a  somewhat  extensive  revision  of  much  of  the  material  in  Chapter 
11  has  become  increasingly  evident.  During  the  coming  year  the  committee  expects  to 
offer  for  your  approval  a  rearrangement  of  the  subject  matter,  consisting,  among  other 
things,  of  a  revision  of  forms,  specifications  and  definitions  to  conform  to  modern 
practice. 

In  preparing  any  proposed  revisions,  the  committee  will  not  neglect  to  consider 
whether  the  expense  to  the  Association  is  justified. 

Chairman  Knowles:  The  report  on  Assignment  2  will  be  given  by  Mr.  Braden, 
chairman  of  the  subcommittee. 

E.  V.  Braden  (Pittsburgh,  Chartiers  &  Youghiogheny) :  What  could  be  drier  than 
a  bibliography  on  a  dry  subject?  Fortunately  for  the  work  of  this  committee,  our  chair- 
man, Mr.  Knowles,  has  made  clear  that,  instead  of  being  a  dry  subject,  records  and 
accounts  is  a  very  live  subject,  vibrant,  in  fact,  with  that  something,  that  experience, 
shall  we  say,  orderly  recorded,  a  knowledge  of  which  is  essential  to  the  intelligent 
steering  of  the  good  ship  Transportation  through  the  turbulent  waters  of  today. 

Subcommittee  2  has  compiled  from  many  sources  the  bibliography  on  pages  371 
and  372.  We  believe  the  list  to  be  useful  to  one  seeking  such  information,  not  only  as 
a  casual  interest  but  particularly  to  one  who  from  duty  must  keep  informed  on  the  trend 
of  thought  and  practice  in  railroad  valuation,  taxation,  financing  and  accounting. 

Because  of  the  number  of  American  railroads  in  bankruptcy  and  the  number  of 
railroads  now  undergoing  reorganization  in  the  hope  of  avoiding  bankruptcy,  your 
attention  is  called  to  an  item  on  the  list  of  subjects,  of  widest  general  interest  and 
importance  at  this  time.  I  refer  to  the  publication  of  Duke  University  Law  School, 
of  a  symposium  of  thirteen  articles  on  railroad  reorganization.  Here  the  intricacies  of 
the  law,  finance  and  economic  problems  are  brought  together  with  the  interests  of 
organized  labor  and  ownership,  and  they  are  discussed  by  men  particularly  competent 
in  their  respective  fields  of  railroad  administration,  large  financing  operations,  corpora- 
tion law,  organized  labor  and  organized  ownership. 

The  potential  consequences  of  the  policies  that  are  being  developed  through  the 
solution  of  these  problems  will  certainly  be  vital  to  the  future  of  American  railroads. 
The  bibliography  is,  as  usual,  submitted  as  information. 

Chairman  Knowles:  The  report  on  Assignment  3,  Office  and  drafting  room  practices, 
will  be  given  by  Mr.  Teal,  the  chairman  of  the  subcommittee. 

D.  C.  Teal  (Chesapeake  &  Ohio):  This  report  presents  discussion  on  five  subjects. 
The  reports  on  three  topics  are  submitted  as  information  while  the  other  two  offer 
material  recommended  for  inclusion  in  the  Manual. 

Under  the  heading  Drafting  Equipment  and  Tools  it  is  noted  that  the  subject  was 
reported  last  year  as  information.  This  year,  after  reviewing  for  possible  Manual  ma- 
terial, your  committee  recommends  that  the  subject  be  discontinued. 

The  report  on  Specifications  of  material  to  be  used  for  drawings  and  drafting, 
discusses  the  various  factors  that  influence  the  selection  of  drawing  materials  and 
describes  present  common  practices  of  ordering  them.  The  conclusions  are  that  the 
present  methods  of  selecting  and  ordering  are  quite  satisfactory  and  that  spec.fications 
would  be  unnecessary.  The  report  is  presented  as  information,  with  the  recommenda- 
tion that  the  subject  be  discontinued. 

The  report  on  Standard  system  for  filing  drawings,  describes  the  various  methods 
and   equipment   used   by    railroad   offices.  The   conclusions   are   that   standardization   of 


860  Records    and   Accounts 


methods  would  be  impractical  because  of  the  diffcrenics  in  individual  requirements.  The 
report  is  presented  as  information. 

The  subject  Welding  symbols  is  brought  before  the  Association  at  this  time  because 
of  certain  late  developments.  The  American  Welding  Society  has  recently  adopted  a 
new  code  of  symbols.  Recognizing  their  authority  in  such  matters,  it  is  believed  desir- 
able to  have  their  symbols  available  for  railway  drafting  room  use.  However,  in  order 
to  avoid  having  material  in  the  Manual  that  would  be  subjected  to  revisions  by 
another  organization  and,  so,  might  soon  be  out  of  date,  it  is  proposed  to  pubUsh 
only  the  reference  to  them  as  indicated  in  the  second  paragraph  on  page  379.  This  reads: 
"It  is  recommended  that  the  symbols  of  the  American  Welding  Society  be  used.  These 
symbols,  together  with  instructions  for  their  use,  are  pubUshed  in  bulletin  form  and 
may  be  obtained  from  the  American  Welding  Society." 

I  move  that  this  information  on  Welding  Symbols  be  published  in  the  Manual. 

(The  motion  was  seconded.) 

H.  M.  Stout  (Northern  Pacific) :  I  would  like  to  inquire  of  the  chairman  of  the 
subcommittee  how  extensive  a  bulletin  that  document  is  to  which  he  refers. 

Mr.  Teal:  The  bulletin  in  its  present  form  is  32  pages  of  standard  letterhead,  8J/2 
by  11,  and,  besides  the  symbols  themselves,  it  embodies  quite  a  bit  of  detailed  instruc- 
tions for  their  use.  The  symbols  would  be  useless  without  the  instructions.  It  would 
require  the  entire  publication. 

Mr.  Stout:  The  idea  of  the  subcommittee  is  that  the  symbols,  as  they  are  presented 
now,  are  not  fixed,  that  is,  they  vary  from  time  to  time? 

Mr.  Teal:  They  have  been  revised  two  or  three  times  in  the  last  two  years,  to 
my  knowledge,  and  they  will  be  subject  to  further  revision  without  any  knowledge  on 
our  part. 

Mr.  Stout:  Under  the  circumstances,  Mr.  Chairman,  I  think  the  subcommittee's 
recommendation  is  a  wise  one,  not  to  try  to  publish  it  themselves  because  they  couldn't 
keep  up  with   the  procession,  probably. 

Mr.  Teal:  That  was  the  thought.  The  bulletins  cost,  I  think,  15  cents,  if  you  apply 
to  the  proper  authority,  the  secretary  of  the  American  Welding  Society. 

(Mr.  Teal's  motion  was  then  put  to  a  vote  and  carried.) 

Mr.  Teal:  Your  committee  has  also  reviewed  the  report  entitled  "Style  To  Be  Used 
in  the  Preparation  of  Reports  and  Specifications"  which  was  originally  submitted  in 
1938  as  information,  but  with  the  understanding  that  it  would  later  be  considered  for 
inclusion  in  the  Manual.  Believing  it  worthy,  your  committee  recommends  its  publi- 
cation. 

I  move  that  the  report  on  "Style  To  Be  Used  in  the  Preparation  of  Reports  and 
Specifications"  now  appearing  in  Vol.  39,  pages  661  to  669  of  the  Proceedings,  be 
published  in  the  Manual. 

(The  motion  was  seconded.) 

Secretary  Lacher:  I  would  hke  to  call  attention  to  the  fact  that  many  of  the 
abbreviations  recommended  are  not  the  same  as  those  used  in  the  present  Manual.  For 
example,  in  the  first  part,  on  abbreviations,  it  specifies  the  same  standard  that  we  use 
in  our  other  publications,  namely,  to  abbreviate  units  of  measure  such  as  inches,  feet, 
pounds,  and  so  forth,  when  used  with  numerals  and  to  spell  them  out  when  used  with 
numbers  spelled  out. 

I  agree  with  the  committee  that  that  is  the  best  system  but  the  fact  remains  that 
the  editor  of  the  Manual,  presumably  with  the  support  of  the  Manual  committee, 
decided  that  feet,  inches,  pounds  and  other  units  of  measure  were  to  be  spelled  out  in 


Discussion 861 

all  cases.  Consequently,  if  what  the  committee  now  submits  is  to  he  adopted,  either 
we  must  rewrite  a  large  part  of  the  Manual  or  we  must  have  the  Manual  carry  out 
a  style  which  is  not  in  conformity  with  what  is  now  submitted. 

Vice-President  Bond:  That  is  an  important  point  that  the  secretary  has  brought  to 
our  notice,  to  the  effect  that,  while  the  substance  of  the  matter  may  be  in  order,  its 
set-up  is  subject  to  further  revision  insofar  as  abbreviations,  to  make  it  consistent  with 
what  is  already  in  the  Manual. 

Mr.  Teal:  Perhaps  in  view  of  the  non-conformity  we  had  better  withdraw  our 
motion  and  attempt  to  get  together,  before  presenting  it  for  inclusion. 

Secretary  Lacher:  I  would  like  to  suggest  that  this  be  brought  to  the  attention  of 
the  Manual  Committee  of  the  Board  with  a  view  to  arriving  at  some  agreement  as  to  the 
best  policy  to  pursue. 

(The  motion  was  withdrawn  with  the  consent  of  the  seconder.) 
Mr.  Teal:  This  concludes  the  report  of  the  subcommittee. 

Chairman  Knowles:  The  report  on  Assignment  4  will  be  given  by  Mr.  Restall, 
chairman  of  the  subcommittee. 

H.  L.  Restall  (Boston  &  Maine):  The  report  of  Subcommittee  4  is  one  of  progress. 
It  has  recently  been  demonstrated  by  floods,  hurricanes  and  operating  emergencies  arising 
from  other  occasions  that  many  carriers  do  not  have  readily  available  sufficient  infor- 
mation to  facilitate  the  immediate  replacement  of  certain  electrical  equipment. 

The  demand  for  this  kind  of  information  being  obvious,  this  subcommittee  has 
undertaken  the  study  of  the  conditions  for  the  purpose  of  calUng  attention  to  such 
deficiencies  of  records  and  recommending  a  system  whereby  the  information  may  be 
collected   and   perpetuated. 

Under  this  specific  assignment  the  committee  found  itself  confined  to  property 
coming  under  the  jurisdiction  of  the  maintenance  of  way  department.  Realizing  that 
some  railroad  organizations  place  the  responsibility  for  electrical  equipment  in  other 
departments,  it  has  requested  that  the  scope  of  the  assignment  be  enlarged  to  include 
all  such  electrical  equipment,  regardless  of  what  department  may  be  responsible  therefor. 
The  study  further  indicated  the  probable  desirability  of  including,  in  addition  to 
electrical  equipment,  such  items  as  motor  cars,  machinery  and  roadway  tools.  Permis- 
sion has  now  been  granted,  with  the  proper  collaboration,  to  include  these  features  in 
the  committee's  study  and  it  proposes  to  proceed  along  these  lines  for  the  ensuing  year. 
The  report  of  this  subcommittee  is  offered  as  a  progress  report. 

Chairman  Knowles:  Assignment  No.  5  is:  Construction  reports  and  records.  The 
committee  has  no  report  to  offer  at  this  time.  A  study  has  been  in  progress  during  the 
year,  and  the  committee  e.xpects  to  offer  some  recommendations  at  the  convention  next 
year.  The  report  on  Assignment  6,  Valuation,  will  be  given  by  Mr.  Barnhart,  chairman 
of  the  subcommittee. 

S.  H.  Barnhart  (Norfolk  &  Western):  The  first  assigned  subject  is:  Resume  of 
developments  of  the  current  year  in  connection  with  regulatory  bodies  and  the  courts. 
We  have  recorded  the  developments,  under  this  assignment,  and  I  shall  not  take  your 
time  to  attempt  to  reiterate  the  items  of  the  report,  other  than  to  say  that  there  is 
nothing  of  major  importance  that  should  be  called  to  the  attention  of  the  convention. 

The  second  assigned  subject,  ICC  valuation  orders,  reports  and  records:  First 
under  this  assignment  we  present  a  form  for  a  record  of  ballast  changes,  with  the 
recommendation  that  it  be  included  in  the  Manual. 

The  second  is  a  study  of  Valuation  Order  No.  3  reports  and  records  to  determine 
if   further  simplifications   are   possible.  While   the   committee   recognizes   that    there   are 


862  Records    and    Accounts 


many  things  that  we  would  like  to  do  in  connection  with  these  reports  and  records 
of  property  changes  or  valuation  work,  we  have  nothing  of  major  importance  to  report 
this  year. 

There  have  been  a  number  of  items  that  have  come  to  the  attention  of  the  com- 
mittee. They  have  been  handled,  and  some  results  have  been  obtained. 

The  last  subject  assigned  is:  Form  of  Order  No.  3  reports  in  connection  with  joint 
projects,  federal-railroad.  Our  report  shows  we  have  been  unable  to  reach  a  conclu- 
sion in  connection  with  this  matter,  largely  because  we  find  difficulty  between  several 
departments  of  the  Bureau  of  Valuation  as  to  how  these  matters  are  to  be  handled. 
We  are  hopeful  that  in  another  year  this  subject  may  be  concluded. 

The  report  is  offered  as  information  except  Exhibit  I,  which  I  move  be  adopted  for 
inclusion  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Knowles:  The  report  on  Assignment  7  will  be  given  by  Mr.  Barnes, 
chairman  of  the  subcommittee. 

H.  D.  Barnes  (Chicago  &  North  Western) :  As  in  previous  years,  the  committee 
has  reviewed  a  number  of  proposed  accounting  case  rulings  or  orders  submitted  to 
Mr.  Bunnell,  vice-president,  Association  of  American  Railroads,  by  the  Bureau  of  Ac- 
counts of  the  Interstate  Commerce  Commission.  These  subjects  are  described  in  the  first 
part  of  the  report. 

Lists  of  the  orders  modifying  the  accounting  classifications  and  accounting  rulings 
and  interpretations  issued  by  the  Interstate  Commerce  Commission  are  shown  in  the 
latter  part  of  the  report. 

It  is  obvious  that  the  accounting  classifications  are  undergoing  a  gradual  revision 
and  this  procedure  is  of  great  importance  to  the  railways.  As  stated  in  presenting  this 
committee's  report  for  1939,  informal  arrangements  are  effective  with  Mr.  Bunnell 
whereby  proposed  accounting  orders  or  rulings  pertaining  to  the  accounting  for  property 
changes  or  maintenance  of  roadway  and  structures  are  referred  to  this  committee  for 
consideration.  Representatives  of  the  Bureau  of  Accounts  have  indicated  an  apprecia- 
tion of  our  comments.  We  would  like  to  have  every  member  of  this  Association  who 
is  interested  in  the  changes  that  are  being  made  in  the  accounting  classification  feel 
that  he  is  afforded  an  opportunity  for  expressing  his  opinions  in  regard  to  these  im- 
portant questions  through  any  member  of  this  committee. 

This  report  is  submitted  as  information  with  the  recommendation  that  the  subject 
be  continued. 

Chairman  Knowles:  The  report  on  Subject  8  will  be  given  by  Mr.  Baldwin,  chair- 
man of  the  subcommittee. 

F.  B.  Baldwin  (Atchison,  Topeka  &  Santa  Fe) :  The  assignment  is:  Methods  of 
avoiding  duplication  of  reports  and  for  simplifying  and  coordinating  work  under  the 
requirements  of  the  ICC  and  other  public  authorities.  Duplication  of  reports  is  some- 
thing that  grows  like  many  things  in  nature.  Reports  are  hke  thistles  or  dandelions. 
The  first  one  is  no  problem  but  in  a  few  years  it  is  found  that  where  one  plant  is 
allowed  to  grow,  hundreds  have  come  into  existence  and  have  sapped  the  vigor  of  the 
more  useful  plant  life.  Once  the  growth  has  started,  the  seed  gets  into  the  soil,  and 
a  constant  war  must  be  waged  to  enable  the  useful  plant  life  to  exist. 

When  a  business  organization  is  small,  no  reports  are  necessary  because  the  boss 
sees  all  and  knows  all  that  is  going  on.  As  the  organization  grows  larger,  departments 
are  created.  One  man  can  no  longer  oversee  the  entire  workings,  and  department  heads 
are  required  to  make  periodic  reports.  Thus  the  thing  starts.  As  the  organization  con- 
tinues to  grow,  departments  create  branches.  The  branch  heads  make  reports  to  de- 


Discussion 863 

partment    heads,    and    department    heads    condense    these    reports    into    reports    to    the 
superintendent. 

Ev-entually  the  organization  becomes  quite  complex.  Cost  studies  have  to  be  made, 
and  numerous  other  factors  have  to  be  given  consideration,  all  of  which  require  reports 
and  more  reports.  It  becomes  necessary  to  create  a  department  for  making  reports. 
This  department,  in  order  to  justify  its  existence,  must  be  fed  with  reports  upon  which 
to  base  its  own  reports.  There  seems  to  be  no  end. 

Public  interest  in  the  growth  of  an  industry  demands  regulation  by  a  public  authority. 
A  governmental  bureau  gets  started,  and  there  is  created  a  further  demand  for  reports 
by  this  higher  authority.  This  demand  goes  to  the  officials  of  the  industry.  Additional 
reports  are  required  of  the  record  department,  and  this  extends  on  down  into  the  very 
roots  of  the  plant. 

Until  public  regulation  came  into  the  picture,  the  industry  had  some  chance  to 
curtail  this  growth  of  reports  within  its  own  organization.  Where  reports  no  longer 
served  any  useful  purpose,  or  duplicates  were  found,  they  could  be  discontinued.  The 
management  could  simply  say  "Stop"  and  the  employees  could  turn  to  more  useful 
work.  Even  at  that  the  weeding  out  of  unnecessary  reports  was  usually  incomplete. 
E.xperience  shows  that  many  reports  once  started  continue  automatically,  long  after 
there  is  any  real  demand  for  them.  Demand  by  governmental  authorities  cannot  be 
easily  decreased.  One  bureau  finds  needs  for  certain  information ;  other  bureaus  need 
reports  from  other  points  of  view.  Duplication  is  a  natural  result.  One  bureau  does  not 
always  inquire  what  information  the  other  bureaus  have. 

In  recent  years  the  growth  of  bureaus  has  followed  the  same  expanding  pattern. 
As  indicated  in  the  first  paragraph  of  the  subcommittee's  report,  the  Association  of 
American  Railroads  has  an  organization  helping  to  fight  this  growth  of  reports.  Recently 
that  organization  has,  to  some  extent,  been  able  to  curtail  this  growth  of  demands  for 
additional  reports  and,  to  a  small  degree,  has  been  able  to  lessen  the  burden  of  existing 
demands. 

In  the  second  paragraph  of  the  report,  the  subcommittee  calls  attention  to  two 
instances  where  expanding  bureaucratic  activities  have  increased  the  burden  on  railroads. 
The  subcommittee  finds  a  certain  amount  of  hesitancy  on  the  part  of  railroad  repre- 
sentatives to  join  in  concerted  action  in  this  matter.  The  interests  of  various  depart- 
ments are  involved,  and  the  benefits  to  be  derived  from  the  existence  of  a  particular 
report  and  its  effect  upon  the  good  relations  with  pubUc  officials  must  be  weighed  against 
its  cost. 

Each  railroad  has  its  experiences  not  only  with  the  requirements  of  the  bureaus  of 
the  federal  government  but  also  with  the  requirements  of  the  commissions  of  the 
various  states.  The  subcommittee  calls  attention  in  the  fourth  and  fifth  paragraphs  of  the 
report  to  two  instances  where  the  requirements  of  the  commissions  of  individual  states 
were  sub.stantial  duplications  of  reports  furnished  to  a  federal  bureau.  In  these  instances 
considerable  saving  in  expense  appears  to  have  been  accomplished  by  prevailing  upon 
the  state  commissions  to  accept  a  copy  of  the  report  to  the  federal  bureau  in  Ueu  of  its 
own   requirements. 

The  subcommittee  has  not  been  able  to  get  many  definite  suggestions  for  improve- 
ment of  the  situation.  Is  it  possible  that  this  condition  is  hke  the  weather  problem, 
where  everybody  complains  and  nobody  can  do  anything  about  it?  Complaining  is  not 
effective  unless  you  have  some  solution  to  offer. 

As  stated,  the  Association  of  American  Railroads  is  working  on  this  problem  and 
I  am  sure  will  gladly  give  consideration  to  any  suggestions  an  individual  railroad  may 
have. 


864 Rules    and    Organization 

The  subcommittee  calls  attention  to  another  feature  in  this  year's  report.  This  should 
be  of  special  interest  to  many  railroad  engineers.  The  inside  workings  of  the  Interstate 
Commerce  Commission  may  be  familiar  to  lawyers  and,  to  some  extent,  to  the  account- 
ants but  to  many  engineers  this  great  regulatory  body  is  pretty  much  of  a  mystery. 

Attached  to  our  report  on  pages  386  and  3^2  in  Exhibit  2  we  have  included  in  the 
Proceedings,  where  it  would  be  readily  available  to  all  members  of  the  Association,  the 
latest  organization  schedule  and  assignment  of  work  and  functions  of  the  commission. 
This  should  give  anyone  interested  a  general  idea  of  how  the  commission  operates. 
While  this  information  does  not  directly  relate  to  the  subcommittee  assignment,  it  is 
considered  useful  and,  in  some  respects,  is  not  entirely  foreign  to  the  assignment. 

The  subcommittee's   report   is   offered   as  information. 

Chairman  Knowles:  The  subject  of  Assignment  9  is:  Records  of  property  leased 
and  available  for  lease.  This  is  a  somewhat  new  subject.  The  committee  is  studying 
it  but  has  no  report  to  offer  you  at  this  time. 

This  concludes  the  report  of  Committee  11. 

E.  M.  Hastings  (Richmond,  Fredericksburg  &  Potomac) :  I  don't  think  we  ought 
to  pass  this  report  without  some  comment  on  the  splendid  presentation  that  has  been 
made  by  Mr.  Knowles  and  his  committee.  They  have  departed  somewhat,  in  fact  con- 
siderably, from  the  usual  stereotyped  form  of  presenting  subcommittee  reports  and 
have  made  a  most  splendid  presentation.  The  report  contains  information  which  is  of 
great  value  to  all  of  us.  I  personally  want  to  say  this  word  of  commendation  of  the 
committee. 

Vice-President  Bond:  The  presentation  has  certainly  been  done  in  a  very  inter- 
esting way,  and  I  am  very  glad  to  hear  the  remarks  from  the  floor  to  that  effect. 

The  committee  is  excused  with  the  thanks  of  the  Association. 


Discussion  on  Rules  and  Organization 

(For  Report,  see  pp.   515-538.) 

(Vice-President  Bond  presiding) 

Chairman  W.  T.  Dorrance  (New  York,  New  Haven  &  Hartford) :  The  first  subject 
assigned  to  this  committee,  as  to  all  committees,  is  Revision  of  Manual.  The  committee 
finds  the  situation  somewhat  peculiar  in  this  respect  as  the  present  Manual  contains  no 
subject  matter  for  this  committee,  but  the  1929  Manual  and  supplements  thereto  contain 
matter  that  has  been  approved  by  the  Association  at  various  times. 

In  order  to  carry  out  the  intent  of  the  assignment  for  revision  of  the  Manual,  the 
committee  felt  that  it  was  necessary  to  go  back  to  the  old  material.  In  order  to  present 
new,  revised  material,  the  committee  recommends  the  elimination  of  all  material  hitherto 
adopted  by  the  Association  on  the  recommendation  of  Committee  12  and  published  in 
the  1929  Manual  and  supplements  thereto  but  withheld  from  publication  in  the  present 
Manual  by  order  of  the  Board  of  Direction. 

I  move  the  adoption  of  this  recommendation. 

(The  motion  was  seconded.) 

H.  L.  Browne  (Chicago):  I  was  a  member  of  this  committee,  previous  to  1938, 
for  20  years.  I  have  been  a  member  of  the  Association  30  years.  During  that  period  I 
said  two  sentences  from  the  platform  but  never  spoke  from  the  floor.  You  are  a 
Canadian.  I  am  a  great  nephew  of  George  Browne  whose  statue  is  on  the  left  hand 
as  you  go  into  the  parliament  of  your  home  town.  I  am  no  public  speaker,  very  poorly 
equipped.  I  don't  want  to  offend  anybody.  I  don't  want  to  use  personalities,  but  I  have 


Discussion  865 

probably  attended  more  committee  meetings  than  any  other  member  of  the  Rules 
and  Organization  committee. 

There  has  been  a  great  variance  of  opinion.  We  have  gone  before  the  Board  of 
Direction  and  the  Committee  on  Outline  of  Work  time  and  time  again.  We  never  held 
an  opinion  opposite  to  any  other  committee,  where  we  could  get  them  together.  We 
were  a  conciliation  committee.  I  think  in  a  five-year  period  I  read  every  word  of  107 
rule  books.  I  don't  claim  to  be  any  authority,  either.  I  haven't  had  time  to  think  over 
all  the  rules  in  this  book,  but  one  of  the  striking  things  of  this  book  was  that  the 
superior  officer  was  relieved  of  his  responsibility.  In  one  place  it  says  the  employee 
shall  provide  himself  with  a  rule  book.  About  page  90  it  rules  that  the  superior  should 
provide  that.  Sears,  Roebuck  won't  sell  a  rule  book. 

Vice-President  Bond:  Mr.  Browne,  may  I  ask  if  you  arc  speaking  to  the  motion 
that  is  now  before  the  house? 

Mr.  Browne:  Am  I  out  of  order? 

Vice-President  Bond:  I  think  some  of  the  remarks  are  somewhat  foreign  to  the 
motion. 

Mr.  Browne:  Here  is  what  I  want  to  say:  I  don't  think  that  this  committee  has 
existed  long  enough  to  go  into  one-tenth  of  the  responsibilities  and  realities  connected 
with  this  thing.  I  don't  believe  anyone  has  had  time  enough  to  consider  these  rules, 
and  I  don't  believe  the  various  committees  that  are  concerned  have  had  time  to  consider 
these  rules. 

Vice-President  Bond:  Will  you  kindly  repeat  the  motion? 

Chairman  Dorrance:  The  motion  is  that  the  committee  recommends  the  elimina- 
tion of  all  material  heretofore  adopted  by  the  Association  on  the  recommendation  of 
Committee  12,  and  published  in  the  1929  Manual  and  supplements  thereto  but  withheld 
from  publication  in  the  present  Manual  by  order  of  the  Board  of  Direction. 

Vice-President  Bond:  The  motion  is  to  withdraw  what  has  already  been  published — 

Chairman  Dorrance:  What  has  been  published  in  the  1929  Manual,  pages  789  to  871 ; 
Bulletin  337,  pages  82  to  85;  Bulletin  347,  pages  26  to  30;  Bulletin  356,  page  52;  Bulle- 
tin 367,  pages  106  and  107;  and  Bulletin  378,  pages  57  to  62. 

Mr.  Browne:  I  want  to  say  one  thing  more.  Mr.  A.  R.  Wilson  came  before  our  com- 
mittee in  1938  and  said  he  was  authorized  by  the  Board  of  Direction  to  publish  every- 
thing that  had  been  passed  by  the  convention  up  to  that  time  and  had  previously 
passed.  I  want  the  Board  of  Direction  to  do  that — either  do  it  or  don't  do  it.  I  don't 
see  Mr.  Wilson  around  here  but  he  can  verify  that.  He  asked  permission,  and  I  said 
I  would  ask  the  committee  if  they  would  permit  him  to  speak,  and  he  appeared  there 
and,  after  quite  a  long  discussion,  I  think  he  was  100  percent  for  the  committee.  He 
came  back  and  said  they  would  publish  it.  Therefore,  I  think  the  Board  of  Direction 
should  be  responsible  to  the  membership.  I  want  that  promise  kept.  That  is  what  I  am 
after,  Mr.  Bond. 

I  have  worked  a  great  many  years,  and  I  don't  think  that  this  committee  in  two 
years  even  scratched  the  surface. 

(Chairman  Dorrance's  motion  was  then  put  to  a  vote  and  carried.) 

Chairman  Dorrance:  Subject  No.  2  instructed  the  committee  to  prepare  rules  and 
regulations  for  the  guidance  of  employees  of  the  maintenance  of  way  department, 
collaborating  with  appropriate  standing  committees. 

The  committee  offers  at  this  time  as  a  substitute  for  the  matter  which  has  now 
been  deleted  the  new  matter,  which  appears  in  the  committee's  report.  This  represents 
the  work  of  two  years  of  rather  intensive  study,  with  careful  review  of  books  of 
rules  of  various  railroads.  The  proposed  rules  arc  intended  to  be  general  rules  and  wc 


866 


Rules    and    Organization 


attempted  to  eliminate  from  these  general  rules  specific  instructions  which  might  come 
under  the  head  of  specifications  for  carrying  out  detailed  work  which  we  believe  prop- 
erly belong  to  the  several  standing  committees  handling  those  special  subjects. 

E.  M.  Hastings  (Richmond,  Fredericksburg  &  Potomac):  We  have  another  chair- 
man here  who  is  a  modest  chap.  He  is  beckoning  to  me  to  do  some  talking.  I  didn't 
expect  to  do  any  on  this  particular  matter  this  morning.  You  will  notice  that  the 
chairman  has  rather  adroitly  worded  the  sentence  which  he  just  read  to  you.  I  am 
going  to  be  very  frank  and  give  you  my  opinion.  The  material  presented  represents 
a  considerable  amount  of  intensive  work  on  the  part  of  the  committee.  It  is  not  my 
view  that  it  is  Manual  material.  My  view  is  that  the  Manual  of  the  American  Railway 
Engineering  Association  should  not  contain  material  such  as  has  been  promulgated 
by  this  committee  at  this  time.  Therefore,  I  am  offering  a  motion  that  it  be  received 
as  information. 

(The  motion  was  seconded.) 

Chairman  Dorrance:  Mr.  Hastings  moved  that  the  report  be  received  as  information 
to  give  an  opportunity  for  any  further  study  and  comments  that  might  be  made  during 
the  next  year.  The  committee  is  willing  to  accept  that. 

Vice-President  Bond:  I  think  the  committee  can  offer  that  statement  without  a 
motion,  Mr.  Dorrance. 

C.  H.  Mottier  (Illinois  Central) :  Mr.  Browne  made  only  one  specific  criticism  of 
these  rules.  As  I  had  a  small  part  in  the  preparation  of  the  rule  criticized,  I  would  like 
the  privilege  of  answering  his  criticism.  His  criticism  was  directed  at  Rule  30  on  page 
516.  That  Rule  30  appears  under  Responsibilities  and  Restrictions  and  reads  as  follows: 
"Employees  whose  duties  are  prescribed  by  these  rules  and  regulations  must  provide 
themselves  with  copies.  They  must  familiarize  themselves  with  the  rules  and  regulations 
affecting  their  duties,  whether  or  not  they  appear  under  the  head  of  their  specific  duties, 
and  must  be  prepared  to  pass  an  examination  on  them  at  any  time.  If  in  doubt  as  to 
the  exact  meaning  of  any  rule  or  regulation  they  must  apply  to  the  proper  authority  for 
explanation." 

I  understood  Mr.  Browne's  criticism  to  be  that  the  responsibility  should  rest  on 
the  supervisory  officer  and  not  be  unloaded,  if  you  please,  on  the  employee. 

The  basis  on  which  these  rules  have  been  prepared  should  be  explained.  They  are 
grouped  under  certain  functional  subjects;  that  is  trackmen  rules  are  grouped  together; 
bridge  men's  rules  are  grouped  together,  etc.  In  the  first  section  are  grouped  general  rules 
applicable  to  all  employees,  so  as  to  avoid  repeating  the  same  rule  several  times,  as  is 
dorte  in  many  books  of  rules. 

If  you  turn  to  page  519  you  will  find  the  heading  "Supervisory  Officers  and  Fore- 
men." All  such  general  rules  applicable,  we  will  say,  to  a  section  foreman,  a  bridge 
foreman  or  any  supervisory  officer,  are  grouped  under  this  heading  and  should  be  read 
and  observed  by  them.  If  a  rule  is  applicable  to  all  foremen,  it  will  be  found  in  this 
one  section,  not  in  five  or  six  different  places.  Then  if  there  is  a  rule  applicable  to  a 
section  foreman  and  to  no  other  foreman,  that  rule  should  appear  under  the  Track  sec- 
tion. Listen  to  rule  No.  90  on  page  519.  "Books  of  Rules  and  Regulations. — Supervisory 
employees  must  be  fully  conversant  with  the  rules  and  regulations,  must  see  that 
subordinates  who  should  have  copies  are  supplied,  and  see  that  they  are  receipted  for, 
understood  and  complied  with  by  those  under  them." 

This  answers  Mr.  Browne's  criticism. 

W.  C.  Barrett  (Lehigh  Valley):  I  think  now  that  the  question  has  come  up  it 
is  only  fair  to  have  the  members  of  the  Association— I  am  not  sure  but  perhaps  I  am 


Discussion 867 

giving  you  some  information  >ou  already  have,  understand  what  the  problem  is  that 
this  committee  is  facing.  It  is  really  a  question  of  whether  or  not  this  Association  wants 
to  have  printed  in  the  Manual  any  rules  whatever  for  the  conduct  of  maintenance  of 
way  work.  That  is  the  question  which  I  think  should  be  in  the  minds  of  all  of  the 
members  of  this  Association  between  the  end  of  this  convention  and  the  convention 
next  year,  because  the  committee  will  bring  before  you  next  year  these  same  rules 
which  have  been  printed  in  the  bulletin  this  year,  with  the  request  that  they  be 
approved  for  printing  in  the  Manual.  I  just  wanted  to  present  that  as  clearly  as  I 
know  how,  so  you  could  keep  that  in  mind  between  now  and  next  year,  because  next 
year  you  will  have  to  decide  whether  or  not  you  want  this  committee  to  do  anything. 

W.  G.  Arn  (Illinois  Central) :  There  are  one  or  two  points  I  would  like  to  mention. 
I  am  glad  that  this  is  being  carried  over  at  least  for  another  year  because  there  are 
some  parts  that  pertain  to  various  other  committees,  that  should  be  studied  by  those 
committees.  I  am  wondering  whether  the  Association,  if  it  should  publish  this  ulti- 
mately in  the  Manual  or  merely  in  the  Proceedings,  will  want  to  go  on  record  as  en- 
dorsing a  rule  which  is  not  now  enforced  on  most  of  the  railroads,  will  not  be  enforced 
and  probably  cannot  be  enforced.  I  think,  therefore,  that  the  committee  should  give 
further  consideration  to  the  wording,  and  whether  or  not  there  should  be  such  a  rule 
as  Rule  22  on  page  516,  which  reads  as  follows: 

Use  of  Intoxicants  and  Narcotics. — The  use  of  intoxicants  or  narcotics  is  prohibited. 

There  is  no  limitation  whatever  on  that.  If  one  of  the  largest  railroad  companies 
in  the  country  can't  discharge  a  locomotive  engineer  who  is  drunk  on  his  locomotive 
so  he  can't  do  his  duty,  I  doubt  if  such  a  rule  could  be  enforced,  even  if  it  were  put  in. 

Chairman  Dorrance:  This  is  reprinted  from  the  standard  code  of  the  AAR. 

Colonel  Arn:  That  is  a  good  point  but  I  don't  think  that  should  be  binding  on 
this  Association.  If  it  is  binding,  it  might  be  taken  up  with  the  proper  authority  to 
see  if  that  shouldn't  be  changed.  We  shouldn't  stultify  ourselves. 

There  is  another  point  to  which  I  think  the  committee  should  give  consideration. 
It  has  recommended  on  page  532,  under  First  Aid  to  Injured:  See  "First  Aid  Instruc- 
tions for  Railroad  Employees,"  approved  and  pubhshed  by  Operating-Transportation 
Division,  Association  of  American  Railroads. 

This,  I  understand,  was  prepared  by  the  Medical  and  Surgical  Section  of  the  AAR, 
and  that  should  govern  in  this  Association,  but  I  think  that  this  committee  should  go 
over  those  rules  carefully  to  see  if  it  has  any  suggestions  as  to  changes  before  we 
adopt  them.  Possibly  we  might  have  changes  to  suggest  that  would  be  acceptable  to  the 
Medical  and  Surgical  Section. 

Chairman  Dorrance:  The  committee  has  gone  over  these  rules  and  makes  the 
recommendation  as  it  stands. 

Mr.  Browne:  There  are  many  matters  I  could  touch  on  in  that  report.  We  only 
got  it  lately,  and  I  have  been  busy.  I  only  used  one  instance.  I  have  had  twenty  years 
on  the  committee,  and  I  have  an  idea  of  what  it  is  about.  I  have  met  all  these  various 
committees  at  times,  and  it  is  pretty  hard  to  get  them  to  go  along.  I  am  in  favor  of 
what  Mr.  Barrett  said. 

I  am  not  opposing  the  rules  but  I  think  they  should  be  fine-tooth  combed  by  every 
committee,  and  their  criticisms  and  reports  and  everything  should  be  published,  so  the 
membership  could  be  informed.  After  that  I  am  in  favor  of  having  these  rules  published. 
I  am  100  percent  for  that.  I  looked  through  the  rules  as  published  here,  and  in  my 
opinion  there  is  one  rule  which  my  own  committee  approved,  but  which  I  didn't  think 
should  be  approved,  and  that  is  the  one  I  referred  to. 


868  Wood    Bridges    and   Trestles 

What  I  would  suggest  is  that  all  the  various  committees  study  these  rules  and 
inform  someone  of  their  views.  The  next  year  those  rules  should  be  presented  as  infor- 
mation, and,  after  they  go  through  that,  the  third  year  they  should  be  adopted,  that  is, 
either  adopted  or  rejected. 

Chairman  Dorrance:  The  committee  will  welcome  any  criticisms  from  any  mem- 
bers or  any  other  committees  during  the  next  year. 

Vice-President  Bond:  If  there  is  no  further  discussion,  the  report  is  received  with 
the  thanks  of  the  Association  and  the  committee  is  excused.   (Applause) 

[At  a  meeting  on  March  18,  1941,  just  after  the  conclusion  of  the  convention,  the 
Board  of  Direction,  by  a  unanimous  vote  of  those  present,  discontinued  the  Committee 
on  Rules  and  Organization — Secretary  J 

Discussion  on  Wood  Bridges  and  Trestles 

(For  Report,  see  pp.  247-293.) 

(Vice-President  Bond  presiding) 

Chairman  H.  M.  Church  (Chesapeake  &  Ohio) :  The  committee  presents  reports  on 
subjects  1,  2,  4,  6,  and  8,  and  reports  progress  on  subjects  3,  7,  9,  and  10.  The  committee 
has  in  the  courso  of  preparation,  under  Subject  7,  plans  for  revision  of  the  designs  for 
trestles  that  are  now  in  the  Manual. 

Subjects  1  and  2  have  been  handled  together  and  are  being  treated  as  a  revision  to 
the  Manual.  Mr.  L.  W.  Smith,  who  has  taken  very  active  part  in  the  handling  of  this 
matter  in  connection  with  the  American  Lumber  Standards,  will  present  the  report. 

L.  W.  Smith  (National  Lumber  Manufacturers'  Association) :  In  the  revision  of  those 
sections  of  the  Manual,  pages  7-11  to  7-1 S  of  the  present  Manual,  which  pertain  to  the 
Specifications  of  Lumber  and  Timbers,  the  wording  of  the  Manual  material  and  the  Amer- 
ican Lumber  Standards  were  brought  into  agreement.  Most  of  the  revisions  of  the  Manual 
are  editorial.  The  arrangement  also  has  been  changed,  resulting,  we  believe,  in  a  more 
logical  organization  of  the  material.  It  will  be  necessary  to  make  a  few  additional  changes 
that  are  not  shown  in  the  report,  but  they  are  merely  editorial  and  involve  no  particular 
difficulty. 

The  major  changes  that  have  been  made,  which  are  not  of  an  editorial  nature  are, 
first,  those  pertaining  to  paragraphs  135  and  140  in  which  the  permissible  sum  of  sizes  of 
knots  in  joists  and  planks,  beams  and  stringers  is  defined.  In  the  former  specifications, 
the  sum  of  the  size  of  all  knots  within  the  middle  half  of  the  Jength  of  a  joist,  for  ex- 
ample, was  limited  to  four  times  the  size  of  the  largest  knot  admitted,  without  regard  to 
the  length  of  the  piece.  Therefore  more  severe  knot  restrictions  were  placed  on  long  joists 
than  on  short  ones. 

The  new  specification  defines  the  sum  of  the  sizes  of  all  knots  as  a  variable  depending 
on  the  length  of  the  piece,  with  due  safeguards  against  closely  spaced  knots.  It  is  believed 
the  new  specifications  provide  a  more  equitable  limitation  of  knots  and,  at  the  same 
time,  provide  adequately  for  the  desired  quality. 

Second,  in  paragraph  106  in  the  former  specification,  slope  of  grain  was  not  limited 
to  posts  and  timbers.  In  the  revision,  such  limitation  is  provided. 

Third,  paragraph  860,  specifications  for  shingles  are  very  much  simplified  and  con- 
densed. Fourth,  sections  pertaining  to  factory  and  shop  lumber  have  been  eliminated. 
Fifth,  definitions  have  been  improved  by  cross  references.  In  the  former  specifications 
some  terms  were  defined  in  the  body  of  the  text  but  not  in  the  definitions.  In  the  revi- 
sion, proper  cross  references  have  been  made. 


Discussion  869 

This  report  is  presented  for  adoption  as  Manual  material,  and  I  move  its  adoption. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Church:  Under  subject  4  we  offer  tentative  specifications  for  the  design  of 
wood  bridges  and  trestles.  This  matter  has  been  handled  by  Mr.  Hart,  and  he  will  present 
the  report. 

R.  P.  Hart  (Missouri  Pacific) :  We  have  been  building  wood  bridges  and  trestles  for 
a  long  time,  and  it  looks  as  if  we  ought  to  have  specifications  for  doing  it.  This  specifica- 
tion is  not  new  to  many  of  you,  and  a  large  part  of  it  you  will  note  has  been  taken  from 
the  Manual,  page  7-107  under  the  heading  "Notes  on  the  Use  of  Stress  Grades."  Those 
notes  were  prepared  sometime  ago,  after  extensive  tests  in  the  Forest  Products  Laboratory 
at  Madison  and,  we  feel,  form  a  sound  basis  for  this  specification. 

Some  paragraphs  have  been  added  to  cover  loads  to  be  considered  and  the  method 
of  treating  those  loads.  Those  paragraphs  that  have  been  added  follow  very  closely  the 
material  in  the  Manual  under  masonry  and  steel  bridges.  In  other  words,  we  proposed  to 
have  our  wood  bridges  and  trestles  designed  fully  as  efficiently  and  effectively  as  any 
other  type  of  structure.  We  realize  that  there  arc  some  features  concerning  the  application 
of  load  which  need  a  little  further  study.  We  propose  to  give  the  specification  that  further 
study  during  the  coming  year.  We  will  welcome  any  suggestions  that  you  have  to  offer 
as  to  the  application  of  those  specification  requirements. 

I  would  like  to  call  to  your  attention  one  correction  in  particular  in  Section  lOlS  on 
page  276.  The  formula  under  sub-section  (d)  is  incorrect  in  that  there  has  been  deleted 
the  factor  9L  from  the  denominator.  That  should  appear  immediately  below  the  factor 
lOP  in  the  numerator. 

This  report  is  submitted  as  information  with  the  thought  that,  after  further  study, 
we  may  be  able  to  present  to  you  for  adoption  as  Manual  material  in  another  year  a 
specification  acceptable  to  you. 

F.  R.  Smith  (Union  Railroad) :  In  connection  with  the  design  of  timber  structures, 
and  particularly  bridge  ties  on  open  decks,  the  question  of  longitudinal  shear  in  timbers 
under  beam  action  has  always  been  a  problem.  I  have  discussed  the  subject  with  men  in 
the  design  field,  and  no  one  seems  to  know  just  exactly  how  to  handle  the  problem  eco- 
nomically. We  figure  the  maximum  longitudinal  shear  at  the  points  of  support  from  the 
theory  of  mechanics,  which  perhaps  does  not  hold  true  because  we  assume  a  plane  section 
before  bending  remains  a  plane  section  after  bending,  and  at  these  points  this  assumption 
probably  is  not  true. 

Then  the  other  feature  that  complicates  the  problem  is  the  amount  of  tie  or  beam 
existing  beyond  the  point  of  support,  where  there  is  no  theoretical  horizontal  shear.  I 
would  appreciate  knowing  whether  or  not  the  chairman  has  made  any  tests  or  knows  of 
anyone  who  has  made  tests  pertaining  to  the  subject  of  longitudinal  shear  resulting  from 
bending  under  the  conditions  mentioned. 

Mr.  Hart:  I  do  not  know  of  any  tests  in  that  particular  form  but  there  have,  of 
course,  been  numerous  tests  on  beams  at  the  Forest  Products  Laboratory  to  determine 
the  value  in  shear,  and  that  is  the  basis  of  this  specification  1015.  You  will  find  under 
section  (a)  and  (d)  basic  formulas  which  we  propose  to  use.  Under  (d)  the  formula  is  a 
modification  based  on  the  latest  tests  made  at  the  Forest  Products  Laboratory  and  it  al- 
lows a  little  more  leeway  than  the  older  formula  found  in  sub-section  (a).  You  will  be 
able  to  secure  through  Mr.  John  A.  Newlin,  in  charge  of  Section  on  Timber  Mechanics 
at  Madison,  copies  of  tests  on  the  beams,  which  may  give  you  thi-  information  that  you 
desire. 

Mr.  Smith:  I  have  one  more  question.  Do  you  feel  that  a  timber  tie  can  initially 
fail  from  longitudinal  shear?  In  my  opinion,  it  is  quite  difficult  to  conceive  of  initial 
failure  in  longitudinal  shear. 


870 Wood    Bridges    and    Trestles 

Mr.  Hart:  I  not  only  believe  they  can  fail  in  longitudinal  shear,  I  know  they  can 
fail,  because  I  have  seen  them  fail.  That  is  a  feature  which  must  be  particularly  watched 
in  timbers.  Douglas  fir  timbers  will  not  take  the  stress  in  longitudinal  shear  that  certain 
other  timbers  will  take.  Of  course,  Douglas  fir  has  its  advantages  in  other  ways.  You  will 
find  in  the  section  now  in  the  Manual  on  stress  grades  that  the  shear  values  vary  with 
different  kinds  of  timber,  and  it  is  just  as  important  to  consider  the  shear  in  timber  as  in 
any  other  material.  In  fact,  longitudinal  shear  stresses  are  governing  in  certain  classes 
of  timber. 

A.  B.  Chapman  (Chicago,  Milwaukee,  St.  Paul  &  Pacific):  Under  Section  1009,  in 
the  last  paragraph,  the  effect  of  centrifugal  force,  and  so  forth — may  we  disregard  if 
the  track  is  superelevated  to  compensate  for  curvature?  Do  you  consider  that  all  tracks 
should  be  compensated  for  theoretical  curvature,  or  should  it  be  proportional? 

Mr.  Hart:  My  thought  is  that  that  is  a  matter  which  the  designer  will  have  to  con- 
sider with  judgment,  knowing  the  speeds  that  will  obtain  and  the  conditions  under  which 
he  will  get  the  maximum  load  condition.  If  the  track  is  fully  superelevated  for  maximum 
load  condition,  then  your  resultant  load  will  be  applied  normally  to  your  stringers  and 
your  longitudinal  effect  will  be  relieved. 

Mr.  Chapman:  Will  we  have  any  trouble  if  we  slope  the  cap  and  the  floor  of  a 
ballasted  deck  with  the  ballast  moving  out  to  the  low  side? 

Mr.  Hart:  You  may  if  the  superelevation  is  more  than  four  or  five  inches.  I  have 
known  of  some  complaint  where  a  superelevation  of  five  to  six  inches  was  used  in  the 
floor,  and  trouble  was  experienced  with  the  ballast  crowding  downgrade. 

Mr.  Chapman:   But  up  to  that  height  you  haven't  found  any  difficulties? 

Mr.  Hart:   Not  so  much  up  to  that  height. 

Chairman  Church:  Subject  5,  Bearing  power  of  wood  piles  and  Subject  6,  Recom- 
mended relationships  between  the  energy  of  hammer  and  the  weight  or  mass  of  pile  for 
proper  pile  driving,  have  been  handled  under  one  subject.  The  chairman  of  this  sub- 
mittee,  Mr.  Heinlen,  will  present  the  report. 

H.  C.  Heinlen  (Atchison,  Topeka  &  Santa  Fe) :  A  report  was  made  on  this  subject 
last  year  in  general  terms,  referring  only  to  the  energy  of  steam  hammers.  We  find,  after 
further  study  and  consideration,  that  it  is  desirable  to  place  some  additional  limitations 
on  pile  driving  equipment  and  we  have  revised  the  material  under  the  heading  of  Steam 
Hammers  accordingly.  You  will  note  especially  the  limitations  of  unit  energy  and  total 
energy  required  in  the  hammer  and  that  we  have  limited  the  size  of  the  concrete  pile 
to  that  which  can  be  handled  by  standard  pile  driving  equipment  on  the  market. 

We  have  also  placed  a  lower  limit  on  the  weight  of  the  ram  and  we  have  limited 
the  speed  of  the  hammer.  This  is  to  prevent  a  contractor  from  trying  to  substitute  equip- 
ment and  telUng  us  he  can  get  the  required  foot-pounds  energy  with  a  light  hammer 
operated  at  high  speed.  With  these  lower  limits  placed  on  the  ram  and  limiting  the 
speed  to  the  normal  rate  of  operation,  we  feel  that  we  have  a  recommendation  that  will 
protect  the  engineer,  and  serve  as  a  guide  for  the  selection  of  pile  driving  equipment. 

The  latter  part  of  the  assignment  is  a  series  of  tables  made  up  to  show  the  support- 
ing capacity  of  piles  driven  by  various  weights  and  types  of  hammers  in  common  use. 
These  tables  are  self-explanatory  and  are  corrected  to  take  into  account  the  efficiency  of 
the  hammer.  The  committee  is  aware,  of  course,  that  we  cannot  depend  entirely  upon  a 
formula  for  computing  the  capacity  of  piles,  but  they  do  serve  to  give  a  general  idea  of 
what  may  be  expected,  and  they  also  serve  the  further  purpose  of  bringing  out  some 
interest  and  discussion  of  the  subject. 

One  person  has  already  reported  that  he  has  made  a  comparison  of  the  tables  in  this 
bulletin  with  some  actual  pile  driving  data  and  tests,  and  has  found  they  agree  quite 


Discussion 871 

closely.  The  committee  would  appreciate  it  if  the  members  of  the  AREA  who  are  driving 
test  piles  and  have  complete  drivinp;  a..d  test  loading  data,  would  cooperate  with  the 
committee  by  furnishing  copies  of  such  data  to  the  chairman  so  that  after  a  period  of 
years  we  will  have  a  definite  check  on  the  value  of  the  formulas  now  in  common  use. 
This  revision  or  redraft  of  material  and  additional  material  is  presented  as  information. 

Chairman  Church:  Subject  8,  Fireproofing  wood  bridges  and  trestles  including  the 
placing  of  fire  stops  is  submitted  in  final  form.  Due  to  the  fact  that  none  of  the  mem- 
bers of  the  committee  is  present,  Mr.  Oliver  will  explain  the  report. 

W.  A.  Oliver  (University  of  Illinois) :  The  sub-committee,  after  enumerating  ways 
of  decreasing  the  fire  hazards  in  wooden  trestles,  which  it  recognizes  exists,  recommends 
that  paragraphs  2,  5  and  6,  now  in  the  Manual  under  the  heading  Best  Method  of  Fire- 
proofing  Wood  Bridges  and  Trestles  be  changed  in  accordance  with  the  material  which 
is  presented  at  the  bottom  of  page  291  of  the  report. 

A  reference  to  the  Manual  will  show  that  these  changes  in  every  case  consist  of  added 
material.  No  changes  have  been  made  to  the  material  which  at  present  is  in  the  Manual. 
As  the  committee  recommends,  I  move  that  these  changes  be  accepted  for  inclusion  in  the 
Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Church:  This  completes  the  report  of  Committee  7. 

Vice-President  Bond:  The  committee  is  excused  with  the  thanks  of  the  Association. 
(Applause) 

Discussion  on  Impact 

(For  Report,  see  pp.  393-^83.) 

(Vice-President  Bond  presiding) 

Chairman  J.  B.  Hunley  (New  York  Central):  Due  to  the  lack  of  necessary  equip- 
ment for  making  additional  tests,  it  was  not  possible  to  report  any  definite  progress  on 
the  special  assignments  of  this  committee.  However,  due  to  the  generosity  of  the  Asso- 
ciation of  American  Railroads,  which  provided  certain  funds,  and  the  Pennsylvania 
Railroad  which  provided  us  with  the  test  data  which  has  been  obtained  on  some  very 
interesting  tests  at  Chester,  Pa.,  the  committee  was  able  to  analyze  those  tests  and,  I 
think,  submit  certain  data  which  will  be  of  interest  to  the  Association.  It  certainly 
is  a  contribution  to  the  whole  subject  of  impact. 

These  tests  were  very  carefully  made.  It  is  the  first  time  that  we  have  had,  as  far 
as  I  know,  tests  in  which  both  electric  and  steam  locomotives  were  operated  at  very 
high  speeds. 

This  report  embraces  a  description  and  analysis  of  tests  made  on  two  plate  girder 
spans  55  ft.  10  in.  and  122  ft.  long.  Stresses,  vertical  deflections,  and  lateral  deflections 
were  measured  at  the  center  of  each  span  under  four  different  types  of  locomotives, 
running  at  speeds  ranging  from  approximately  five  m.p.h.,  which  may  be  considered 
static  loading,  up  to  maximum  speeds  of  105  m.p.h.  for  the  two  types  of  electric  loco- 
motives, 80  m.p.h.  for  the  freight  type  steam  locomotive,  and  90  m.p.h.  for  the  passenger 
type  steam  locomotive. 

The  electrical  measuring  equipment  consisted  of  electrical  deflectometers,  accel- 
erometers  which  were  used  for  measuring  lateral  deflections  and  about  20  magnetic  strain 
gages,  which  were  recorded  on  four  six-element  oscillographs.  In  other  words,  24  simul- 
taneous readings  on  stresses  and  deflections  were  obtained.  In  addition  to  this,  we  had 
the  mechanical  deflectometers  which  were  used  in  the  Big  Four  tests,  as  reported  in 
Bulletin  380. 


872 Impact 

The  results  of  these  tests  are  of  particular  interest  to  railway  engineers  generally, 
for  two  reasons:  First  because  the  higher  speeds,  which  are  considerably  higher  than 
in  any  previous  test,  give  information  of  value  with  respect  to  present-day  speeds  of 
operation  and,  second,  because  comparison  is  afforded  between  the  effects  of  locomotives 
with  and  without  the  so-called  hammer  blow  resulting  from  the  overbalance  in  the 
driving  wheels  of  steam  locomotives. 

The  total  impact  effect  produced  by  each  of  these  locomotives,  in  percent  of  stress 
measured  at  a  speed  of  approximately  five  miles  per  hour,  that  is  at  static  loading,  is 
shown  in  Figs.  45  to  51,  and  so  on. 

In  the  digest  of  the  report  there  is  a  comparison  of  the  impact  effect  from  the  va- 
rious locomotives  at  high  speeds  on  both  spans,  and  it  will  be  noted  from  the  tabulation 
and  figures  that  there  was  no  marked  reduction  of  impact  with  the  electric  locomotives 
even  though  they  had  no  unbalanced  counterweight.  This  perhaps  may  seem  a  little 
strange,  but  it  can  be  explained  by  the  fact  that  the  two  types  of  steam  locomotives 
used  were  especially  well  counterbalanced.  That  is,  if  those  locomotives  had  had  the 
amount  of  overbalance  provided  for  in  our  design  specifications,  or  the  large  over- 
balance that  a  great  many  locomotives  now  in  service  have,  the  comparative  impact  from 
the  electric  locomotives  would  have  been  far  more  favorable. 

In  addition  to  the  total  dynamic  effects,  data  were  also  analyzed  for  the  purpose  of 
studying  the  magnitude  of  the  individual  impact  effects  which  make  up  the  total  impact 
effect.  These  individual  effects,  expressed  in  percentage  of  static  stress  as  found  in  the 
study,  are  as  follows: 

No.  1 :  A  definite  increase  due  to  speed  and  termed  speed  effect  was  found  throughout 
the  tests,  and  this  was  entirely  distinct  from  the  vibration  that  was  developed  by  the 
moving  load.  The  probable  explanation  of  this  speed  effect  is  the  centrifugal  force 
developed  by  the  locomotive  while  following  the  path  of  the  deflected  span. 

This  raises  the  famous  old  questions  of  "why  do  we  have  a  camber",  and  "is  camber 
necessary?"  While  camber  is  usually  provided,  it  is  customary  to  frame  it  out  in  the 
deck.  This  speed  effect  is  due  to  the  span  deflection,  and  in  addition  to  the  centrifugal 
force  of  the  load  following  the  deflected  path,  there  is  present  the  inertia  of  the  masses 
of  the  span  and  live  load  falling  through  that  distance.  When  there  is  no  camber  in 
the  span,  perhaps  it  will  become  the  practice  to  provide  for  it  in  the  deck  framing,  how- 
ever offensive  to  the  eyes  of  the  track  men  this  may  be. 

If  I  may  refer  you  to  Figs.  28  to  35  on  pages  457  to  463,  you  will  note  that  these 
speed  effects  increase,  as  they  should,  with  the  square  of  the  speed.  They  are  somewhat 
higher  than  the  theoretical  curves  based  on  an  approximate  formula  and,  in  some 
instances  as  much  as  10  to  15  percent.  This  has  not  been  taken  into  account  in  any 
impact  formula.  While  it  did  occur  to  a  marked  extent  on  these  two  spans,  it  is  some- 
thing which  we  need  to  investigate  a  httle  further. 

No.  2:  The  effect  of  roll  was  found  as  in  other  tests,  and  the  results  are  shown  on 
the  diagrams  on  pages  457  to  464.  I  need  only  say  here  that  the  roll  effect  generally 
is  less  than  the  design  specification  or  the  rating  rules  call  for.  On  the  55-ft.  span,  the 
girders  are  only  five  feet  apart,  or  directly  under  the  rail,  where  maximum  effect 
would  occur. 

No.  3:  With  the  electric  locomotives  we  had  a  very  good  chance  to  segregate  the 
track  effect  from  the  total  impact  effect  because  there  were  no  unbalanced  parts  on  these 
locomotives.  This  track  effect  can  be  due  to  out-of-round  wheels  or  flat  spots  on  wheels 
or  track  irregularities.  Supposedly,  the  track  effect  should  increase  with  the  square  of 
the  speed,  but  it  will  be  noticed,  from  Figs.  36  to  39,  inclusive,  that  it  reaches  a  maximum 


Discussion 873 

at  speeds  of  30  or  40  or  SO  miles,  with  little  or  no  increase  at  higher  speeds.  Possibly 
the  rating  rules,  which  provide  for  track  effect  increasing  with  the  square  of  the  speed, 
can  later  be  revised.  This  would  be  fortunate  as  the  track  effect  is  quite  an  important 
factor  in  the  total  impact  on  short  spans. 

It  might  be  of  interest  to  know  that  Professor  Ingliss,  who  is  probably  the  fore- 
most authority  in  England  on  this  subject,  told  me,  when  he  was  in  my  office  about  a 
year  and  one-half  ago,  that,  from  a  theoretical  analysis  and  tests  which  he  had  made 
at  Cambridge  University,  he  is  convinced  that  the  maximum  effect  occurs  at  between 
20  and  30  m.p.h.  I  questioned  this  at  that  time  but  it  has  been  verified,  to  a  certain 
extent,  by  these  tests. 

No.  4:  Combined  track  and  hammer  blow  effect  of  the  steam  locomotive:  These 
effects  could  not  be  separated,  due  to  the  presence  of  overbalance,  but  they  were  found 
to  be  about  what  could  be  e.xpected  and  were  lower  than  provided  for  in  the  design 
specifications. 

As  in  former  tests,  locomotive  spring  damping  was  apparent.  I  would  like  to  refer 
to  Figs.  42  and  43  on  pages  471  and  472.  You  will  note  in  Fig.  42,  on  either  diagram, 
at  a  speed  of  about  three  revolutions  per  second,  or  about  42  m.p.h.  the  oscillations, 
instead  of  following  the  upper  curve  as  we  would  expect  when  the  springs  remained 
locked,  suddenly  decreased  in  magnitude  and  later  increased,  approaching  a  second 
peak.  This  is  due  solely  to  spring  damping.  As  soon  as  the  sprung  weight  of  the  locomo- 
tive is  set  in  motion,  the  spring  friction  damps  out  the  primary  oscillations,  but  at 
higher  speeds  a  second  critical  frequency  maj'  occur. 

You  will  note  as  represented  by  the  dotted  line,  that  the  oscillations  do  increase, 
but  they  never  reach  the  magnitude  that  would  have  been  expected  if  the  springs  remained 
locked.  The  same  effect  is  shown  in  Fig.  43  on  page  472. 

These  tests  gave  some  information  as  to  two  other  dynamic  effects  about  which 
little  is  known.  From  the  lateral  deflection  of  the  spans  as  determined  by  the  acceler- 
ometers  it  was  possible  to  compute  the  lateral  force  which  would  be  necessary  to  produce 
that  deflection,  and  this  force  was  probably  due  largely  to  nosing  of  the  locomotives. 

In  the  various  tables  given  on  pages  477  to  480  it  is  found  that,  assuming  the 
force  was  concentrated  at  the  center  or  distributed  over  other  points  on  the  span,  the 
lateral  forces  necessary  to  produce  the  measured  deflections  were  quite  high.  In  Table 
35  values  as  high  as  46,000  lb.  are  found.  It  is  interesting  to  note  that  the  maximum 
force  does  not  always  occur  at  the  maximum  speed.  In  some  instances  they  are  quite 
as  high  at  40  m.p.h.,  as  at  80  and  90  m.p.h.  Both  the  design  and  the  rating  rules  provide 
for  this  nosing  effect,  but  whether  the  amount  provided  for  at  present  is  large  enough 
it  is  impossible  to  say. 

Another  thing  which  is  mentioned  in  the  report  but  for  which  no  values  are  given, 
is  the  action  of  the  web  at  the  end  of  the  spans.  Magnetic  strain  gages  were  placed  on 
the  web  plate,  for  the  purpose  of  measuring  dynamic  shear.  It  was  found  that  the 
web  vibrated  laterally  at  very  high  frequencies,  so  that  it  was  impossible  to  determine  the 
shear.  The  total  stress  was  quite  high;  and  was  a  combination  of  direct  shear  and  a 
lateral  bending  of  the  web.  These  webs  are  not  especially  thin.  On  the  short  span  they 
were  t's  in.  thick  and  on  the  long  span  ^  in.  It  may  be  desirable  to  give  some  considera- 
tion to  this  lateral  bending  in  webs,  in  addition  to  the  shearing  stresses. 

The  report  bristles  with  tables  which  may  appear  uninteresting,  but  they  contain  a 
great  deal  of  interesting  information.  However,  for  the  sake  of  easy  interpretation,  the 
results  have  been  shown  in  the  various  diagrams.  After  careful  consideration  of  these 
data,  the  committee  has  reached  these  conclusions: 

(Chairman  Hunley  then  read  the  conclusions  on  page  482.) 


874 Iron   and   Steel   Structures 

Chairman  Hunley.  That  concludes  the  report  of  the  Committee  on  Impact. 
Vice-President  Bond:   If  there  is  no  discussion,  the  committee  is  excused  with  the 
thanks  of  the  Association.   (Applause) 

Discussion  on  Iron  and  Steel  Structures 

(For  Report,  see  pp.  3SS-368.) 

(Vice-President  Bond  presiding) 

Chairman  R.  A.  Van  Ness  (Atchison,  Topeka  &  Santa  Fe) :  Your  committee  has  no 
report  to  offer  this  year  on  Assignments  2,  4,  5,  6,  7  and  8.  Assignment  1,  Revision  of 
Manual,  will  be  presented  by  Mr.  O.  E.  Selby,  chairman  of  that  subcommittee. 

O.  E.  Selby  (Cleveland,  Cincinnati,  Chicago  &  St.  Louis) :  The  revisions  of  the 
Manual  are  confined  mostly  to  revisions  of  the  Specifications  for  Steel  Railway  Bridges. 

On  page  356,  article  301  (b) :   Delete  the  words  "Shoes  and  Pedestals"  in  the  first  line. 

Article  425:  Add  a  paragraph  to  read:   For  stringers,  the  gage  of  the  outstanding 
legs  of  the  connection  angles  over  the  top  one-third  of  the  stringer  depth  shall  be  not 
less  than  the  quantity:  square  root  of  It  over  eight. 
/  =  length  of  stringer  span,  in  inches. 
t  =  thickness  of  angle,  in  inches. 

The  length  of  stringer  span  in  inches  is  correct,  as  read,  and  not  in  feet,  as  printed. 
In  addition  the  letter  L  as  printed  under  the  radical  and  in  the  nomenclature,  should  be 
a  lower  case  /  instead  of  capital  L. 

The  revision  of  432  as  proposed  on  page  356  has  been  withdrawn  by  the  com- 
mittee. That  is:  Stiffeners  at  Points  of  Bearing,  article  432 — everything  to  the  bottom 
of  the  page. 

On  page  357,  articles  504,  505  and  506  are  revised,  and  I  will  read  the  subtitles. 
These  three  numbers  were  submitted  last  year  for  revision  but  were  withdrawn  before 
being  acted  upon  because  the  committee  was  not  satisfied  with  the  wording.  We  have 
gone  over  them  again  and  now  think  that  the  wording  expresses  what  we  mean.  There 
is  no  intention  to  change  the  meaning  of  the  specifications;  it  is  merely  to  make  the 
intended  meaning  clearer. 

(Mr.  Selby  then  read  the  paragraph  headings  on  pages  357  and  358  down  to  1611, 
page  15-48.) 

Mr.  Selby:  In  addition,  I  offer  a  similar  change  on  page  15-27  of  the  Manual.  Change 
the  serial  designation  A141-33  to  A141-39,  with  a  similar  change  in  Article  825. 

(Mr.  Selby  then  read  the  revision  on  Welding.) 

Mr.  Selby:  I  move  the  adoption  and  insertion  in  the  Manual  of  the  revisions  of 
the  Specifications  for  Steel  Railway  Bridges  which  have  been  read  and  referred  to. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Mr.  Selby:  The  following  revision  of  the  Rules  for  Rating  Existing  Iron  and  Steel 
Bridges  is  recommended: 

108:  Under  (c)  Hammer  Blow  Effect,  Clause  3,  substitute  the  numeral  5  for  the 
quantity  w,"  in  the  denominator  of  the  last  term  in  both  formulas  (a)  and  (b). 

This  is  merely  to  clear  up  and  simplify  the  formula  without  any  substantial  change 
in  its  meaning  or  results.  There  is  a  typographical  error  on  page  358.  The  expression 
n'  should  read  nj^. 

I  move  the  adoption  of  the  revision. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 


Discussion 875 

Mr.  Selby:  Instructions  for  the  Maintenance  Inspection  of  Steel  Bridges.  These  in- 
structions were  thrown  back  on  this  committee.  They  constitute  a  revision  of  similar 
instructions  that  formerly  appeared  in  Chapter  12  of  the  Manual,  and  are  now  offered 
for  insertion  in  the  Manual. 

(Mr.  Selby  then  read  the  paragraph  numbers  on  pages  358  to  363,  calling  attention 
to  the  fact  that  the  word  "very"  in  the  sixth  line  from  the  bottom  of  page  362  should 
be  deleted.) 

Mr.  Selby:  I  move  the  adoption  and  insertion  in  the  Manual  of  the  Instructions 
for  the  Maintenance  Inspection  of  Steel  Bridges  which  have  just  been  read  by  reference. 

(The  motion  was  seconded,  put  to  a  vote  and  carried). 

Chairman  Van  Ness:  Assignment  3,  Non-ballast  type  metal  floor  steel  bridges: 
The  report  will  be  presented  by  Mr.  Haggander. 

G.  A.  Haggander  (Chicago,  Burlington  &  Quincy) :  In  our  investigation  we  found 
that,  while  a  large  number  of  these  structures  had  been  constructed  early  in  this  century, 
not  many  are  being  built  at  the  present  time,  and  much  of  the  development  has  been 
along  the  lines  of  altering  and  improving  the  earlier  structures.  New  developments  such 
as  corrosion-resisting  steel,  use  of  rubber  products  for  insulation  and  reducing  noise, 
will  no  doubt  overcome  many  of  the  present  objections  to  this  type. 

Because  of  the  briefness  of  the  report,  it  will  be  desirable  to  read  it  rather  than  to 
try  to  summarize  it. 

(Mr.  Haggander  then  read  the  report  on  Assignment  3,  pages  363  to  365.) 

Mr.  Haggander:  This  report  is  presented  as  information. 

Chairman  Van  Ness:  This  completes  the  report  of  Committee  15. 

Vice-President  Bond:  The  committee  is  excused  with  the  thanks  of  the  Association 
for  this  very  fine  presentation.  (Applause) 


Discussion  on  Buildings 

(For  Report,  see  pp.  22S-245.) 

(Vice-President  Bond  presiding) 

Chairman  L.  H.  Laffoley  (Canadian  Pacific):  Although  our  report  this  year  may 
appear  more  brief  than  is  our  usual  custom,  I  think  some  of  the  subject  matter  found 
therein  will  be  pertinent  to  anyone  in  the  transportation  industry,  particularly  the  second 
report  which  we  are  to  make. 

Of  the  six  assignments,  we  are  reporting  this  year  only  on  two.  Assignments  1 
and  2,  namely.  Revision  of  Manual  and  Preparation  of  specifications  for  railway  build- 
ings, are  permanent  assignments  for  this  committee.  A  certain  amount  of  work  was 
done,  but  we  have  nothing  to  report  on  those  two  assignments  at  this  time. 

Subject  3,  Requirements  and  design  of  garage  buildings  for  railway  service.  We 
are  making  a  final  report  on  this  subject  at  this  time.  I  will  ask  Mr.  J.  P.  Gallagher, 
chairman  of  the  subcommittee,  to  present  this  report. 

(J.  P.  Gallagher,  New  York  Central,  read  the  report  on  Assignment  3.) 

G.  C.  Crites  (Baltimore  &  Ohio):  At  a  time  when  we  take  our  family  automobile 
into  our  own  home,  I  wonder  why,  under  Location,  it  says:  "Garages,  whether  small 
or  large,  should  be  isolated  from  other  structures  in  order  to  reduce  to  a  minimum  the 
hazard  of  exposure  from  fire".  Just  what  does  the  word  "isolated"  mean?  Considerably 
removed  or  fireproofed  away  from  them  ? 

Mr.  Gallagher:  The  word  "isolated"  is  used  in  a  broad  sense.  It  may  be  isolated 
in  the  structure,  depending  upon  the  risk  to  the  plant  or  the  location.  In  your  home 


876 Buildings 

you  actually  have  your  garage  isolated  from  the  rest  of  the  building  by  cement,  plaster, 
or  what-not — cut  off  from  it. 

Chairman  Laffoley:  On  Subject  No.  4,  we  make  no  report  at  this  time. 

Subject  No.  5:  This  subject  has  been  before  Committee  6  for  some  time,  and  we 
now  have  what  I  think  is  a  very  thorough  report  on  this  subject,  Methods  of  deter- 
mining the  protective  value  of  paints.  There  is  probably  no  material  which  we  all 
have  to  deal  with,  that  is  in  more  common  use  than  paint,  and  without  any  reflection 
on  anybody  I  venture  to  state  it  is  a  subject  that  most  of  us  know  least  about.  You 
know  that  it  is  paint,  but  when  you  come  down  to  finally  finding  out  what  it  is,  or 
how  to  find  out  what  you  are  getting,  you  begin  to  appreciate  that  it  is  a  considerable 
problem.  It  is  our  sincere  hope  that  this  report  may  answer  a  few  of  the  questions  on 
that  subject.  I  think  it  is  worthy  of  your  attention.  I  will  ask  Mr.  Angel,  chairman 
of  the  subcommittee,  to  present  this  report. 

C.  M.  Angel  (Chesapeake  &  Ohio) :  The  introduction  of  the  report  gives  a  summary 
of  a  survey  of  39  railroads  to  ascertain  the  manner  in  which  various  railroads  purchase 
paints  and  what  tests  are  made  of  the  paint  product  before  use.  Attention  is  called 
to  the  importance  of  the  paint  manufacturers'  research  to  develop  better  paints,  and 
standardized  methods  of  paint  test  by  the  railroads  to  ascertain  the  comparative  quali- 
ties of  the  paints  before  application.  The  paint  testing  procedure  explains  the  care  that 
must  be  exercised  to  conduct  tests  under  conditions  similar  to  those  to  which  the  paint 
will  be  subjected  after  application. 

From  the  middle  of  page  229  to  page  235  a  description  is  given  of  various  paint 
failures  and  the  causes.  Also,  photographs  are  included  illustrating  the  failures  described. 

Starting  with  the  Physical  Characteristics  on  the  bottom  of  page  235  and  ending 
at  the  top  of  page  242  a  suggested  test  of  paints  is  described,  explaining  how  the  physical 
characteristics  of  the  paint  in  the  beginning  determine  whether  it  is  even  worth  while 
to  make  extensive  tests.  The  text  also  outlines  and  describes  the  chemical  analysis, 
accelerated  weathering  tests,  outside  exposure  tests,  and  various  special  tests. 

In  connection  with  the  accelerated  weathering  tests  of  paints,  it  has  been  called 
to  the  committee's  attention  that  the  word  "weatherometer"  used  in  the  report  is  a 
trade  name  for  a  machine  to  conduct  accelerated  weathering  tests.  Therefore,  the  word 
"weatherometer"  where  used  in  the  report  should  be  changed  to  "accelerated  weathering 
machine". 

The  report  in  conclusion  gives  a  general  description  of  paint  testing  equipment  and 
staff  required  should  a  railroad  desire  to  conduct  tests  of  paints;  also,  a  suggested  plan 
for  the  correlation  of  test  data  accumulated  and  a  suggested  method  of  paint  purchases. 

The  tests  outlined  are  offered  as  suggested  means  through  which  paint  can  be 
tested  to  ascertain  their  comparative  qualities,  and  this  report  has  been  presented  by 
your  committee  primarily  as  a  guide  for  those  who  use  paints. 

The  report  is  presented  as  information. 

Mr.  Crites:  I  notice  that  the  caption  under  the  illustration  on  page  235  states  that 
"Puddles  of  water  were  formed  in  the  basement,  because  tree  roots  clogged  the  sewer." 
I  wonder  if  that  had  anything  to  do  with  the  failure  of  the  paint. 

Mr.  Angel:  I  think  that  failure  was  caused  by  the  moisture  arising  from  the  base- 
ment and  saturating  the  wood.  That  would  be  the  explanation  I  would  offer  to  that. 

Mr.  Crites:  That  is,  water  came  from  the  sewer  and  went  up  into  the  second  story? 

Mr.  Angel:  No,  I  would  say  that  the  moisture  traveled  up  through  the  wood,  into 
the  paint,  behind  it.  I  think  that  the  moisture  could  easily  have  gone  up  between  the 
outside  boarding  and  the  inside  wall  of  the  structure. 


Discussion 877 

Chairman  Laffoley:  As  no  report  is  being  made  at  this  time  on  Assignment  No.  6, 
this  concludes  the  report  of  Committee  6. 

Vice-President  Bond:  If  there  is  no  further  discussion,  the  committee  will  be 
excused  with  the  thanks  of  the  Association. 

Discussion  on  Waterproofing  of  Railway  Structures 

(For  Report,   see  p.   353.) 

(Vice-President  Bond  presiding) 

Chairman  J.  A.  Lahmer  (Missouri  Pacific):  As  indicated  in  the  printed  report  on 
page  353,  we  recommend  changes  in  two  sections  of  the  Manual.  These  changes  do  not 
involve  any  change  in  practice  or  in  the  intent  of  the  specifications.  They  are  as  follows: 

Change  heading  of  Section  203  from  "Asphalt  for  Mopping  Below  Ground"  to 
"Asphalt  for  Saturant  and  Mopping  Below  Ground."  Immediately  after  the  heading,  add 
the  following  paragraph: 

Asphalt  for  saturant  below  ground  shall  meet  the  requirements  of  Section  202. 

In  other  words,  the  same  asphalt  is  used  for  saturant  above  ground  and  for  saturant 
below  ground. 

The  other  change  is  in  the  first  paragraph  of  Section  207  relating  to  fabric,  which 
is  to  be  changed  to  read  as  follows: 

Fabric  shall  consist  of  high-grade  cotton  cloth  saturated  thoroughly  and  uniformly 
with  asphalt  specified  in  Section  202  or  either  type  of  coal  tar  pitch  specified  in 
Section  204. 

These  changes  are  for  clarification  and  I  move  their  adoption. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Lahmer:  The  other  subject  assigned  is:  Waterproofing  of  railway  struc- 
tures. Under  that  we  report  that  we  are  continuing  the  comparative  study  of  ASTM 
specifications  for  waterproofing  materials  and  corresponding  requirements  in  our  specifi- 
cations for  membrane  waterproofing.  We  have  suggested  that  the  ASTM  make  certain 
changes  in  its  specifications  and  have  also  asked  for  further  information  about  the  de- 
tails of  some  of  the  present  requirements  in  those  specifications. 

Representatives  of  ASTM  have  indicated  that  they  would  like  to  continue  the  nego- 
tiations with  a  view  of  ultimately  agreeing  on  specifications  for  waterproofing  materials 
which  will  be  satisfactory  to  the  ASTM,  the  American  Association  of  State  Highway 
Officials.  Federal  Specifications  Board  and  the  AREA. 

That  concludes  our  report. 

Vice-President  Bond:  We  are  much  obliged  to  you  for  a  very  comprehensive  report, 
and  this  last  portion  will  be  accepted  as  progress  and  for  information. 

Chairman  Lahmer:  I  would  like  to  say  one  thing  further.  We  have  recently  been 
informed  by  several  producers  and  dealers  that  they  are  not  able  to  furnish  a  five-ounce 
fabric  for  membrane  waterproofing  such  as  is  stipulated  in  our  specifications.  AREA 
specifications  also  include  requirements  for  a  four-ounce  fabric.  The  committee  would  be 
glad  to  know  whether  any  of  the  members  of  the  Association  are  interested  in  the  use  of 
five-ounce  fabric  for  purposes  that  would  not  be  served  by  the  four-ounce  fabric.  As  a 
matter  of  information.  I  will  say  that  our  requirements  for  four-ounce  fabric  are  very 
similar  to  the  ASTM  requirements  which  include  a  minimum  weight  of  three  and  one- 
half  ounces  instead  of  four. 

Vice-President  Bond:  You  and  your  committee  are  excused  with  the  thanks  of  the 
Association.  (Applause) 


878  Masonry 

Discussion  on  Masonry 

(For  Report,  see  pp.   295-352.) 

(Vice-President   Clarke   presiding) 

Chairman  J.  F.  Leonard  (Pennsylvania):  The  report  of  Committee  8 — Masonry 
covers  15  assignments.  The  first  report  is  on  Revision  of  Manual.  It  embraces  minor 
revisions  in  the  Specifications  for  Portland  Cement  Concrete  and  the  Specifications  for 
Shotcrete.  Mr.  G.  E.  Boyd,  chairman  of  this  committee,  will  present  the  report. 

G.  E.  Boyd  (Railway  Age) :  The  report  of  the  subcommittee  is  made  up  almost 
entirely  of  editorial  revisions.  There  are  two  types:  One  embraces  revisions  that  are 
necessary  to  bring  our  specifications,  where  we  refer  to  the  specifications  of  the 
American  Society  For  Testing  Materials,  up  to  date;  the  others  are  purely  editorial. 

(Mr.  Boyd  then  read  the  revisions  to  Article  102.1,  on  pages  296  and  297.) 

Mr.  Boyd:   I  move  the  adoption  of  these  revisions. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

(Mr.  Boyd  then  read  the  recommended  changes  in  Article  104  and  deletion  of 
separate  references  to  steel  for  bridges  and  buildings.) 

Mr.  Boyd:  I  move  the  approval  of  these  revisions. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

(Mr.  Boyd  then  read  the  recommended  revisions  for  High  Early  Strength  Cement 
down  to  and  including  the  deletion  of  footnote  on  page  8-7.) 

Mr.  Boyd:  I  move  the  approval  of  these  revisions. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

(Mr.  Boyd  then  read  the  substitution  for  Section  5  of  the  Specification  for  Shot- 
crete.) 

Mr.  Boyd:   I  move  the  adoption  of  this  revision. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Leonard:  Assignment  No.  2,  Specifications  and  principles  of  design  of 
plain  and  reinforced  concrete  for  use  in  railway  bridges,  building  and  culverts,  collaborat- 
ing with  Committees  1 — Roadway  and  Ballast,  S — ^Track,  6 — Buildings,  7 — Wood  Bridges 
and  Trestles,  13 — Water  Service,  Fire  Protection  and  Sanitation,  and  15 — Iron  and 
Steel  Structures:  In  the  case  of  the  first  of  these  subjects.  Composite  columns  and  pipe 
columns,  the  committee  has  a  report  to  present  which  involves,  incidental  to  its  presenta- 
tion, certain  revisions  in  the  Manual,  but  since  it  is  also  substantially  an  adoption  of 
certain  subject  matter  in  the  joint  committee  report,  it  is  being  presented  here  for  action. 

In  the  case  of  the  other  two  subjects,  we  have  progress  to  report.  Mr.  A.  N.  Laird, 
chairman  of  assignment  2,  Design  of  columns,  will  present  this  report. 

A.  N.  Laird  (Grand  Trunk  Western) :  This  committee  has  had  the  assignment 
of  composite  columns  and  pipe  columns  for  several  years.  A  previous  final  report  on  the 
subject  has  not  been  made  because  the  matter  was  under  consideration  in  great  detail 
by  the  Joint  Committee  on  Standard  Specifications  for  Concrete  and  Reinforced  Con- 
crete, on  which  the  American  Railway  Engineering  Association  was  represented  by 
members  of  the  Masonry  committee. 

The  Joint  Committee  report  was  published  in  AREA  Bulletin  419  for  September- 
October,  1940,*  and  the  subject  matter  which  is  indicated,  extending  from  the  middle 
of  page  298  to  the  middle  of  page  305  is  substantially  identical  with  the  material  in 
the  joint  committee  report,  with  only  such  editorial  changes  as  are  necessary  to  coordi- 
nate it  with  the  subject  matter  now  in  the  Manual. 


See  page  27  of  the  monograph  section  of  this  issue  of  the  Proceedings. 


Discussion  879 


The  committee  recommends  that  subject  matter  of  Section  307.  Design  of  Columns, 
of  the  Specifications  for  Portland  Cement  Concrete,  Plain  and  Reinforced,  be  withdrawn 
and  that  it  be  replaced  by  new  Section  307,  Design  of  Columns. 

The  present  form  has  not  been  printed  in  this  committee  report  because  of  its 
length  and  because  there  is  such  a  substantial  change  in  form  as  to  make  direct  compari- 
son by  paragraphs  impractical. 

I  would  hke  to  read  a  portion  of  the  first  article  under  the  proposed  section  because 
it  gives  a  very  clear  picture  of  the  viewpoint  of  the  Joint  committee  and  of  the 
Masonry  committee  in  its  approach  to  this  column  design.  It  involves  a  substantial 
change  in  some  respects,  particularly  with  relation  to   spiral  reinforced   columns. 

(Mr.  Laird  then  read  paragraphs  (a)  and  (b)  on  pages  298  and  299.) 

Mr.  Laird:  In  view  of  the  length  of  this  subject  matter,  unless  there  is  some  ob- 
jection, I  will  just  read  the  headings. 

(Mr.  Laird  then  read  the  paragraph  headings  on  pages  299  to  305.) 

Mr.  Laird:  I  move  the  deletion  of  Section  307  in  the  present  Manual  and  the 
substitution  of  the  proposed  form. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Leonard:  Assignment  No.  3  carries  the  general  heading,  Progress  in  science 
and  art  of  concrete  manufacture.  One  of  the  specific  assignments  under  this  general 
heading,  which  this  committee  has  carried  for  several  years  past,  is  entitled,  Needed 
adjustments  in  field  practice  to  use  present  day  cements  to  best  advantage.  This  subject 
was  assigned  to  this  committee  at  its  own  request  and,  after  it  accepted  the  assignment, 
it  found  that  it  had  quite  a  problem  on  its  hands  to  present  the  matter  in  detail.  The 
committee  is  not  now  presuming  to  state  that  what  it  is  now  presenting  is  a  complete 
handling  of  the  subject. 

However,  it  so  happens  that  Committee  C-1  of  the  ASTM  during  the  past  year 
adopted  tentative  specifications  for  five  types  of  Portland  cement,  and  since  no  doubt 
it  intends  to  progress  those  to  final  specifications  in  due  time,  it  was  felt  that  under  this 
assignment  it  was  now  the  proper  time  for  us  to  bring  up  to  date,  so  far  as  we  could, 
those  things  incidental  to  the  subject  that  developed  in  connection  with  these  five  types 
of  cement  now  being  given  a  great  deal  of  publicity.  The  report  is  for  information 
purposes.  It  appears  on  page  305.  The  chairman  of  this  committee,  Mr.  C.  P.  Marsh, 
was  unable  to  be  present  at  the  meeting.  We,  however,  are  very  fortunate  in  having 
with  us  today  Mr.  L.  W.  Walter  who  served  very  ably  for  many  years  as  chairman  of 
this  same  subcommittee  until  relinquishing  the  job  within  the  last  year  due  to  his 
retirement.  He  will  present  the  report. 

L.  W.  Walter  (Jersey  City,  N.  J.):  Our  chairman,  Mr.  Leonard,  has  covered  the 
subject  about  as  fully  as  I  had  in  mind  attempting  to  do,  so  that  what  few  remarks 
I  have  to  make  may,  to  some  extent,  be  a  repetition  of  what  he  has  already  said. 

At  the  time  of  our  last  annual  convention  it  was  reported  that  ASTM  Committee 
C-1  on  Concrete  was  developing  specifications  intended  to  apply  to  five  different  types 
of  Portland  Cement.  Those  specifications  were  presented  to  that  society  at  its  June 
1940,  annual  convention  and  were  approved  by  the  society  as  tentative  specifications 
bearing  the  serial  designation  C-1 50-40. 

Mr.  Leonard  has  said,  in  deahng  with  the  problem  of  needed  adjustments  in  field 
practice  to  use  present  day  cements  to  best  advantage,  the  subcommittee  has  limited 
its  studies  and  this  report  to  the  five  types  of  Portland  cement  and  to  the  new  tentative 
specifications  for  them. 

Since  these  are  tentative  specifications,  they  do  not  set  aside  the  present  standard 
specifications  for  Portland  cement  and  high   early  strength   Portland   cement.  However, 


X80  Masonry 

it  seems  probable  that  during  this  calendar  year  the  present  tentative  specifications  for 
the  five  types  of  cement,  with  such  minor  revisions  as  may  seem  desirable,  may  be 
advanced  to  standard  specifications,  thereby  and  then  superseding  the  present  standard 
specifications  for  Portland  cement  and  for  high  early  strength  Portland  cement  now 
listed  under  serial  designation  C9-38  and  C74-39. 

The  report  is  presented  as  information. 

Chairman  Leonard:  The  next  subject  is  No.  4  entitled  Maintain  contact  with  Joint 
Committee  on  Concrete  and  Reinforced  Concrete.  The  chairman  of  this  committee,  Mr. 
Hirschthal,  is  unable  to  be  here,  but  since  the  speaker  was  also  a  member  of  the  joint 
committee,  he  will  present  the  report.  The  report  of  the  joint  committee  was  published 
as  information  in  Bulletin  419,  Part  1  for  September-October,  1940  and  will  appear  on 
page  27  in  the  monograph  section  of  the  Proceedings  for  1941. 

As  a  matter  of  information  I  will  read  the  foreword  prepared  by  Committee  8  in 
presenting  this  report. 

(Chairman  Leonard  then  read  the  foreword  of  the  Joint  Committee  report.) 

Chairman  Leonard:  The  next  assignment  is  No.  5,  Specifications  for  foundations, 
including  excavation,  cofferdam,  piling,  etc.,  collaborating  with  Committee  1 — Roadway 
and  Ballast  on  soil  mechanics,  and  with  Committee  7 — ^Wood  Bridges  and  Trestles  on 
bearing  power  of  wood  piles  and  pile  driving.  The  committee  has  no  report  to  present 
at  this  time  since  the  activity  on  the  subject  of  foundation  was  concentrated  in  another 
report  on  the  subject  of  test  borings  which  you  will  receive  later. 

Assignment  6.  Methods  and  practices  of  lining  and  relining  tunnels,  collaborating 
with  Committee  1 — Roadway  and  Ballast:  The  chairman  of  this  committee,  Mr.  I.  L. 
Pyle,  is  unable  to  be  present,  and  most  of  the  other  members  of  this  committee  who 
have  been  for  some  time  past  active  on  the  committee  are  also  not  present.  Therefore 
I  will  present  the  report. 

The  report  is  in  two  parts.  The  first  part  is  entitled  Specifications  for  Lining  Rail- 
way Tunnels  with  Metal  Liner  Plates  and  Shotcrete.  You  will  note  that  while  it  is  entitled 
Specifications,  it  is  submitted  at  the  present  time  as  information,  with  the  object  of 
presenting  it  later  for  adoption  and  publication  in  the  Manual,  with  the  expectation  that 
the  members  during  the  current  year  will  have  an  opportunity  to  review  the  subject 
matter  and  give  Committee  8  the  benefit  of  any  criticisms  which  they  have  to  offer. 

Therefore  I  will  not  attempt  to  read  the  report.  I  will  refer  you  to  the  descriptive 
matter  on  page  308,  with  the  plate  showing  the  drawing  of  the  recommended  type  of 
such  construction.  This  is  submitted  as  information. 

The  second  part  of  this  report  is  in  the  form  of  a  revision  of  the  Manual  and  is 
shown  on  page  309. 

(Chairman  Leonard  read  the  first  paragraph  under  Revision  of  the  Manual  on 
page  309.) 

Chairman  Leonard:  Therefore,  that  which  follows  is  an  addition  and  a  revision 
of  the  existing  Manual  material  to  give  the  Association  the  benefit  of  this  alternate  type 
of  tunnel  floor  which  is  now  in  use,  and  very  successfully,  in  some  recent  construction. 

(Chairman  Leonard  then  read  the  matter  from  the  change  in  title  of  Section  202 
on  page  309  down  to  the  end  of  that  page.) 

Chairman  Leonard:  You  will  note  the  section  referred  to  at  the  top  of  page 
310  entitled  Supplement  to  Figures  835  and  836.  You  will  note  the  other  descriptive 
matter  which  is  merely  a  word  description  of  the  construction  dimensions  as  shown  on 
the  sketch  plan  accompanying  the  proposed  form. 

I  move  the  revision  of  the  Manual  accordingly. 

(The  motion  was  seconded.) 


Discussion 881 

J.  B.  Hunlcy  (New  York  Central) :  In  the  figure  on  page  310  for  the  double-track 
section,  you  would  have  only  I'V  in.  of,  let  us  say,  "toehold"  of  the  tie  for  the  inner 
rail.  On  the  curved  track,  it  states  that  the  tie  block  shall  be  thickened  for  super- 
elevation. Is  the  committee  convinced  that  this  tk-in.  encasement  at  the  end  of  that 
tie  would  be  sufficient  to  take  the  horizontal  thrust  due  to  the  centrifugal  force? 

Chairman  Leonard:  That  -fs  in.  is  at  the  center  and  not  at  the  end  of  the  tie. 
The  amount  of  concrete  at  the  end  of  the  tie  will  be  increased  by  the  slope  of  the 
concrete  between  the  center  and  the  end  of  the  tie. 

Mr.  Hunley:  On  the  one  end  of  the  tie  you  show  a  five-inch  depression  of  the  con- 
crete. That  would  give  about  three  inches  at  the  gage  end  of  the  tie.  You  are  sloping 
down  from  that,  to  7ii  in.  at  the  center.  It  would  be  more  than  fs  in.  at  the  outer 
end  of  that  tie,  but  certainly  not  over  34  in.  Are  you  convinced  that  that  is  enough 
for  the  outer  rail  of  a  curve? 

Chairman  Leonard:  The  slope  is  }^  in.  in  12  in.,  and  the  distance  from  the  center 
to  the  end  of  the  tie  is  2  ft.  9  in.  so  that  is  about  2  in.  plus  iV  in.,  which  would  be 
the  thickness  of  the  concrete  shoulder  on  the  inner  end  of  the  tie. 

Mr.  Hunley:  You  think  that  would  be  enough? 

Chairman  Leonard:  That  was  our  conclusion.  Naturally  we  adopted  that  from 
certain  practice  which  has  been  constructed  and  which,  up  to  the  present  time,  we  are 
advised,  has  worked  most  satisfactorily.  I  regret  very  much  that  Mr.  Pyle  isn't  here 
because  Mr.  Pyle  himself  is  one  of  the  pioneers  in  the  adoption  of  this  type  of  floor 
for  tunnel  work. 

Mr.  Hunley:  I  suspect  the  C.  &  O.  has  curves  in  tunnels,  so  it  is  probably  all  right 
for  such  tracks.  In  many  cases  it  is  desirable,  of  course,  to  keep  it  to  a  minimum,  but 
two  inches  looks  pretty  thin  to  me.  I  will  have  to  leave  that  to  the  judgment  of  the 
committee. 

Vice-President  Clarke:   Is  your  question  answered? 

Mr.  Hunley:  In  a  way.  I  think  that  experience  is  really  the  best  answer.  If  they 
have  been  in  serv-ice  long  enough  in  these  tunnels  and  where  they  are  running  at  a 
balanced  speed,  it  is  probably  all  right,  but  it  does  look  small  to  me.  I  am  just  asking 
for  information. 

(Chairman  Leonard's  motion  was  then  put  to  a  vote  and  carried.) 

Chairman  Leonard:  The  next  assignment  is:  Review  specifications  for  overhead 
highway  bridges  of  the  American  Association  of  State  Highway  Officials,  insofar  as 
they  relate  to  masonry,  conferring  with  that  association,  and  Committee  IS — Iron  and 
Steel  Structures.  We  have  no  report.  We  were  unable  to  obtain  any  collaboration  with 
the  AASHO  until  late  in  the  fall  when  we  were  furnished  by  that  body  with  an  advanced 
copy  of  a  proposed  new  specification  which,  since  that  time,  we  have  had  under  study. 
However,  lack  of  time  precluded  the  inclusion  of  any  comment  thereon  as  a  part  of 
this  report  since  it  had  to  go  to  press  the  first  of  December. 

The  next  subject  is  No.  8.  Progress  in  cement  manufacture  and  testing.  This  is 
a  factual  report,  as  information,  describing  the  five  types  of  Portland  cement  recently 
adopted  by  the  ASTM  as  tentative.  You  will  note  that  this  report  gives  the  facts  of 
the  physical  and  chemical  provisions  of  these  five  types  of  cement.  Mr.  C.  P.  Marsh, 
chairman  of  this  committee,  is  unable  to  be  present,  and  Mr.  F.  W.  Capp  who  is  an 
active  member  of  this  committee  will  present  this  report. 

F.  W.  Capp  (Portland  Cement  Association):  The  background  of  this  report  has 
already  been  given  by  the  chairman  and  by  Mr.  Walter  on  Assignment  No.  3.  I  would 
call  attention  to  the  paragraph  in  small  type  at  the  top  of  page  311. 

(Mr.  Capp  then  read  the  note  at  the  top  of  page  311.) 


882 Masonry 

Mr.  Capp:  In  Tables  I  and  II  on  page  312,  the  physical  and  chemical  characteristics 
of  these  various  types  of  cement  are  given.  I  understand  these  are  to  be  changed  in 
minor  detail  for  presentation  to  the  ASTM  convention  in  June  of  this  year. 

In  the  matter  of  testing  you  will  note  that  the  autoclave  test  is  included.  A 
specification  for  fineness  determined  by  the  turbidimeter  tests  for  types  I,  II,  IV  and  V 
are  given,  and  the  compressive  test  on  mortars  is  to  be  continued  as  it  has  been 
heretofore. 

(Mr.  Capp  read  the  second  and  third  paragraphs  on  page  313.) 

Mr.  Capp:  The  remaining  material  in  this  report  is  taken  from  a  paper  by  L.  A. 
Wagner,  chief  research  chemist,  Missouri  Portland  Cement  Company,  presented  at  the 
meeting  of  ASTM  Committee  Cl  on  Cement  held  on  March  18  and  19,  1940. 

The  use  of  additions  of  this  sort  is  being  actively  investigated  at  the  present  time, 
and  some  rather  striking  results  have  been  obtained  both  in  the  laboratory  and  on 
field  installations.  During  the  coming  year  we  expect  to  receive  performance  reports  on 
a  number  of  these  installations,  and  we  hope  to  be  able,  if  these  are  available,  to  present 
a  digest  of  them  in  our  next  report.  This  is  given  as  information. 

Chairman  Leonard:  The  next  subject  is:  Specifications  for  culvert  pipe.  The  speci- 
fications for  placement  which  were  submitted  last  year  as  information  are  now  proposed 
for  inclusion  in  the  Manual.  The  chairman,  Mr.  Doll,  is  unable  to  be  present,  and  I  am 
asking  Professor  Vawter,  a  member  of  this  committee,  to  present  this  report. 

Jamison  Vawter  (University  of  Illinois) :  As  Mr.  Leonard  said,  these  specifications 
were  presented  last  year  as  information,  and  they  are  now  offered  for  publication  in 
the  Manual.  They  cover  specifications,  also,  for  jacking  pipe  through  fills  and  placing 
in  tunnels,  and  some  sketches  of  different  methods  of  bedding  and  for  filling  in  backfill, 
are  given  on  pages  316,  317  and  318.  I  will  merely  read  the  article  headings. 

(Mr.  Vawter  then  read  the  paragraph  headings  on  pages  315  to  319.) 

Mr.  Vawter:  I  move  that  these  Specifications  for  the  Placement  of  Concrete  Culvert 
Pipe  be  adopted  and  published  in  the  Manual. 

(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Leonard:  Incidental  to  the  assignment  just  reported  on,  your  committee 
has  to  recommend  that  the  subject  be  continued  under  the  following  designation:  Main- 
tain contact  with  ASTM  Committee  C-13  on  Concrete  Pipe.  In  other  words,  it  is  felt 
that  the  purpose  which  this  committee  set  out  to  accomplish  has  now  been  accomplished 
with  the  exception  of  maintaining  contact  through  representation  on  Committee  C-13, 
so  that  we  may  keep  in  touch  with  any  further  developments  in  this  field. 

The  next  subject  is  No.  10.  Bibliography  and  review  of  current  engineering  litera- 
ture pertaining  to  railroad  masonry  work.  While  the  committee  within  itself  did  con- 
siderable work  on  this  subject,  there  is  nothing  which  we  have  to  report  at  the  present 
time. 

The  next  assignment  is  No.  11.  Pressure  grouting.  Specifications  for  Solidification  of 
Masonry  Structures  by  Pressure  Grouting  are  submitted  as  information.  Mr.  Ray,  who 
is  chairman  of  this  committee,  will  present  this  report. 

W.  M.  Ray  (Baltimore  &  Ohio) :  Last  year  this  subcommittee  on  pressure  grouting 
submitted  as  information  illustrations  of  various  applications  of  pressure  grouting  and 
descriptions  of  the  application  of  this  method  to  various  purposes.  We  are  now  presenting 
a  specification  which  is  confined  to  the  solidification  of  masonry  structures,  and  it  is 
presented  as  information  this  year  with  the  intention  of  recommending  its  adoption  and 
publication  in  the  Manual  next  year.  I  will  read  the  titles  of  the  paragraphs. 

(Mr.  Ray  then  read  the  paragraph  headings  on  pages  319  and  320.) 


Discussion 883 

Chairman  Leonard:  The  next  subject  is:  Specifications  for  concrete  and  reinforced 
concrete  railroad  bridges  and  other  structures.  This  is  the  biggest  assignment  Committee  8 
has  and  there  is  a  brief  report  on  page  321.  I  am  going  to  ask  Mr.  Splitstone,  who  is 
chairman  of  this  committee,  to  read  this  brief  report  with  the  idea  that,  if  the  members 
have  any  suggestions  incidental  to  this  undertaking,  we  would  be  glad  to  hear  from 
them  now  or  in  writing  during  the  coming  year. 

(C.  H.  Splitstone,  Erie,  read  the  report  on  assignment  12,  on  page  321.) 
Mr.  Splitstone:  I  might  add  the  committee  has  continued  activity  since  the  sub- 
mission of  this  report  for  publication. 

Chairman  Leonard:  The  next  is  13.  Specifications  for  test  borings,  collaborating 
with  Committee  1 — Roadway  and  Ballast.  Mr.  Wilson,  chairman  of  this  subcommittee, 
will  present  this  report. 

W.  R.  Wilson  (Atchison,  Topeka  &  Santa  Fe) :  Your  committee,  in  addition  to 
preparing  specifications  for  test  borings,  decided  it  should  present  considerable  support- 
ing data.  The  steel,  concrete  or  timber  entering  into  a  structure  is  subjected  to  numerous 
tests  to  determine  its  properties.  No  engineer  would  think  of  building  a  structure  without 
knowing  the  strength  of  the  material  going  into  it,  but  in  many  cases  this  same  struc- 
ture is  placed  upon  a  foundation  material  about  which  httle  is  known  and,  in  some  cases, 
nothing  is  known  until  the  excavation  is  made.  This  is  equivalent  to  designing  a  bridge 
without  knowing  the  material  of  which  it  is  to  be  built. 

Test  borings  and  the  identification  and  classification  of  the  soil  serve  a  similar 
purpose  for  the  foundation  material  as  do  the  usual  tests  for  other  structural  ma- 
terials. The  results  of  such  sub-surface  investigation  play  a  very  important  part  in  the 
determination  of  the  most  economical  and  stable  structure  for  a  given  site. 

In  many  cases  where  test  borings  are  made,  the  records  are  not  adequate  and  the 
field  identification  of  the  soils  is  inaccurate.  It  is  a  waste  of  money  to  make  test  borings 
without  proper  identification  of  the  soil  encountered  and  the  keeping  of  adequate 
records.  In  fact,  such  a  procedure  might  be  dangerous,  in  that  it  would  give  a  false 
picture  of  sub-surface  conditions  which  could  lead  to  the  design  of  an  inadequate  or 
even  an  unsafe  foundation. 

To  help  correct  this  situation,  your  committee  is  presenting  as  information  a  brief 
description  of  the  usual  ways  of  making  test  borings  and  a  table  showing  the  various 
methods  of  underground  exploration,  with  their  approximate  cost.  It  is  intended  to 
introduce  the  table  as  Manual  material  next  year. 

The  various  agencies  interested  in  soil  mechanics  and  foundation  design  arc 
especially  anxious  to  standardize  the  field  classification  and  identification  of  soils  so 
that  all  concerned  will  be  speaking  the  same  language.  An  example  of  this  is  quick- 
sand. Many  people  think  of  quicksand  as  a  type  of  soil,  and  it  is  often  so  shown  on 
sounding  data.  However,  quicksand  is  a  natural  phenomenon  in  which  any  fine, 
granular  soil,  with  grains  of  nearly  uniform  size,  is  subjected  to  a  flow  of  water  through 
it  in  such  a  manner  as  to  cause  each  particle  to  be  suspended  in  the  water. 

To  help  advance  the  cause  of  standardization,  a  description  of  the  various  types  of 
soils  and  methods  of  identifying  them,  in  line  with  the  latest  practices,  is  presented  as 
information. 

The  best  of  test  borings  are  useless  unless  records  are  kept  which  will  enable 
the  engineer  designing  the  foundation  to  visualize  the  actual  existing  conditions.  The 
need  for  comprehensive  and  accurate  test  borings  cannot  be  too  highly  stressed.  A  list 
of  the  data  needed  and  a  sample  page  of  such  test  boring  data  is  presented  as  information 
The  specification  for  test  borings  is  .submitted  at  this  time  as  information.  It  is 
intended   to    present   it    next    year    for   publication    in    the    Manual.  This   draft    of    (he 


884 Masonry 

specification  has  been  reviewed  by  several  engineers  who  are  actively  engaged  in  sub- 
surface exploration  and  is  in  line  with  the  latest  developments  of  test  boring  procedure. 
It  necessarily  covers  a  variety  of  methods  for  sub-surface  exploration  but  only  those 
methods  consistent  with  the  information  it  is  desired  to  obtain,  should  be  used  on  any 
particular  job. 

The  committee  requests  comments  from  members  of  this  Association  during  the 
"-oming  year,  with  the  object  of  clarifying  any  point  which  may  be  open  to  discussion, 
before  it  is  presented  as  Manual  material  next  year. 

Chairman  Leonard:  The  next  subject  is  No.  14.  Specifications  for  concrete  placed 
under  water.  Since  we  have  certain  matter  now  in  the  Manual,  on  this  subject,  this 
report  takes  the  form  of  a  replacement  of  present  Manual  matter  by  the  new  matter  as 
indicated  in  the  report.  Mr.  T.  L.  Condron,  who  is  chairman  of  this  committee,  is 
unable  to  be  present,  due  to  an  accident.  I  will  quote  Mr.  Condron's  own  words  by 
telephone  a  few  moments  ago.  Committee  8  extended  our  sympathy  to  Mr.  Condron 
for  having  broken  his  leg.  Mr.  Condron  replied:  "Not  at  all.  The  man  who  drove  the 
other  car  is  the  man  who  broke  my  leg." 

Due  to  Mr.  Condron's  absence,  Mr.  Boyd  will  present  this  report. 
Mr.  Boyd:  The  specification  which  is  presented  for  adoption  and  publication  in  the 
Manual  is  partly  a  revision  of  the  material  now  appearing  in  the  Manual  and,  to  a  small 
extent,  is  an  addition  to  that  material. 

(Mr.  Boyd  read  paragraphs  two  to  four  on  page  332.) 

Mr.  Boyd:  The  specification,  as  the  committee  presents  it,  is  made  up  of  a  number 
of  articles,  the  headings  of  which  I  will  read. 

(Mr.  Boyd  then  read  the  paragraph  headings  of  Section  306  on  pages  332  to  334.) 
Mr.  Boyd:  I  move  the  adoption  of  this  specification  for  publication  in  the  Manual. 
(The  motion  was  seconded,  put  to  a  vote  and  carried.) 

Chairman  Leonard:  The  report  just  presented  involved  a  great  deal  of  work  on  Mr. 
Condron's  part.  I  know  he  canvassed  the  entire  country  for  his  matter. 

The  next  and  last  subject  is:  Durability  of  Concrete,  which  is  presented  as  a  progress 
report  and  is  submitted  as  information.  Mr.  L.  M.  Morris,  chairman  of  this  subcommit- 
tee, is  unable  to  be  present  since  he  is  now  Major  Morris  of  the  U.  S.  Engineers.  Mr. 
Maurice  Coburn  will  present  this  report  for  Mr.  Morris. 

Maurice  Coburn  (Indianapolis,  Ind.):  The  report  is  rather  long,  and  it  is  worth 
study  in  detail.  The  aggregate  comprises  the  major  portion  of  concrete,  and  its  sound- 
ness is  essential  to  durable  concrete.  Recently  an  extended  investigation  of  the  durability 
of  highway  concrete  has  brought  out  the  fact  that  the  older  pavements  that  have  stood 
up  well  were  those  that  did  not  have  too  much  of  the  larger  aggregate.  Consideration  is 
being  given  to  grading  of  the  sizes  of  cement.  The  modern  cements,  with  their  tendency 
toward  early  strength,  increasing  the  amount  of  lime,  fine  grinding,  and  warehousing 
have  not  improved  the  tendency  toward  durability.  The  cement  paste  is  the  part  of  the 
concrete  from  which  we  can  expect  trouble  as  to  durability,  and,  therefore,  it  should  be 
kept  to  the  minimum.  Neat  cement  is  not  as  durable  as  concrete.  The  quality  of  the  gel 
is  primarily  dependent  upon  the  water-cement  ratio,  and  the  voids  in  it  are  a  function 
of  the  water-cement  ratio. 

There  is  more  interest  right  now  in  the  subject  of  admixtures,  and  this  report  has 
some  information  on  that  subject. 

The  deterioration  of  concrete  occurs  primarily  because  of  the  action  of  water  and 
materials  which  it  carries.  Concrete  grows  with  the  deposit  of  material  brought  by  water 
which  enters  it,  but  water  also  dissolves  the  constituents  of  the  concrete,  and  if  water 


Discussion 885 

runs  through  concrete  continuously,  it  will  destroy  it  completely.  The  action  of  con- 
stituents of  the  water  entering  the  concrete  sometimes  is  serious  from  the  mechanical 
action  of  the  materials  deposited  rather  than  from  the  solution  of  the  constituents  of  the 
cement. 

Chairman  Leonard:  I  commend  Major  Morris  and  his  committee  on  this  report  on 
durability.  It  was  an  enormous  undertaking.  I  suggest  that  the  membership  give  partic- 
ular attention  to  F.  Conclusion,  on  page  351,  particularly  to  the  bottom  of  this  page  in 
which  five  items  are  indicated  as  the  high  points  in  the  procedure  to  obtain  durable  con- 
crete. I  would  add,  also,  that  these  items  are  not  listed  in  order  of  importance,  since  all 
five  of  them  really  belong  first. 

That  completes  the  report  of  Committee  8. 

Vice-President  Clarke:  If  there  is  no  discussion,  the  committee  is  excused  with  the 
thanks  of  the  Association.  (Applause) 


MONOGRAPHS 


Mechanization  in  the  Maintenance  of  Way  Department 

Special  Report  Prepared  by  a  Subcommittee  of  Committee  22 — Economics 

of  Railway  Labor  on  Testimony  Presented  by  the  Railroad 

Carrier  Industry  Committee  at  Hearings  on  the 

Fair  Labor  Standards  Act 

F.  S.  Schwinn   (chairman,  subcommittee),  Lem  Adams,  F.  J.  Bishop,  W.  H.  Brameld, 

Armstrong  Chinn,  W.  E.  Cornell,  E.  A.  Craft,  G.  H.  Harris,  W.  E.  Heimerdinger, 
W.'H.  Hillis,  E.  T.  Howson,  T.  Z.  Krumm,  J.  M.  Miller,  G.  M.  O'Rourke,  H.  M. 
Stout,  R.  R.  Strother,  J.  C.  Wallace,  W.  H.  Woodbury. 

In  accordance  with  the  provisions  of  the  Fair  Labor  Standards  Act  of  1938,  public 
hearings  were  held  during  the  early  months  of  1940  by  the  Railroad  Carrier  Industry 
committee  (Committee  No.  9)  for  the  purpose  of  investigating  conditions  in  the  railroad 
industry  and  recommending  the  highest  minimum  wage  rate  (up  to  40  cents  per  hour) 
which  might  be  made  effective  at  this  time  without  substantially  curtailing  employment. 
The  carriers  realized  that  any  advance  in  the  hourly  earnings  of  labor  would  accelerate 
the  mechanization  of  labor  operations,  especially  in  maintenance  of  way  departments 
and  have  a  particular  effect  upon  track  labor. 

The  carriers'  special  committee  appointed  a  subcommittee  under  the  chairmanship 
of  Robert  Faries,*  assistant  chief  engineer — maintenance,  Pennsylvania  Railroad,  and 
including   L.   H.   Bond,   chief   engineer— maintenance   of   way,   Illinois   Central   System; 

G.  M.  O'Rourke,  district  engineer,  Illinois  Central  Railroad;  and  F.  S.  Schwinn,  assistant 
chief  engineer,  Missouri  Pacific  Lines,  for  the  purpose  of  exploring  the  possible  extent  of 
further  mechanization,  measuring  the  increasing  economic  justification  of  such  mechaniza- 
tion at  increasing  hourly  earnings,  and  reviewing  other  means  by  which  offsetting  labor 
economies  might  be  effected  through  capital  expenditures  for  heavier  rail,  roadbed 
stabihzation  and  similar  improvements.  The  results  of  this  subcommittee's  studies  were 
presented  by  Mr.  Faries  in  the  form  of  testimony  and  statements  at  the  public  hearings 
referred  to.  Frequent  reference  was  made  to  the  reports  of  AREA  Committee  22  as 
published  in  the  Proceedings. 

Your  committee  has  undertaken  to  review  Mr.  Faries'  testimony  and  quote  such 
portions  thereof  which  deal  directly  with  labor  economics  and  the  curtailment  in  labor 
resulting  from  mechanization  and  other  causes.  The  statements  included  show  com- 
parable hand  and  machine  organizations,  annual  costs  based  on  hourly  labor  rates  vary- 
ing from  30  cents  to  40  cents  per  hour,  and  both  force  and  expenditure  curtailments 
resulting  from  mechanization.  The  excerpts  from  the  testimony  follow. 


I  wish  to  present  for  your  consideration  certain  facts  and  information  relating 
to  the  effect  of  increased  labor  costs  upon  employment  in  the  maintenance  of  way 
department  of  the  railroad  industry.  I  have  confined  this  study  to  track  mainte- 
nance forces,  principally  to  clarify  it,  and  also  because  this  class  is  affected  to  the 
greatest  extent  in  these  proceedings.  However,  I  wish  to  state  that  under  pressure 
of  increased  costs  the  railroad  industry  must,  of  necessity,  consider  all  fields  for 
curtailment  of  expenses  in  all  departments,  and  the  same  principles  with  which  I  will 
deal  here  apply  to  all  railroad  employment.  .  .  . 

As  wage  costs  rise  the  railroad  industry,  faced  with  a  ceiling  of  rates  for  the 
services  which   it   performs   and,   therefore,   having   a   fixed   gross   revenue   varying 

*  Mr.  Faries  died  September  8,   1940. 


Mechanization    in    Maintenance    of   Way 


only  with  the  amount  of  business  offered,  is  forced  in  a  struggle  for  existence  to 
resort  to  all  possible  means  to  avoid  increasing  current  unit  costs.  The  effects  of 
the  economic  depression,  and  increasing  losses  of  traffic  to  subsidized  competitors, 
have  intensified  this  problem. 

Allotments  for  maintenance  must  not  and  do  not  exceed  a  definite  or  fixed 
portion  of  the  total  operating  revenues,  which  for  some  years  past  has  been  approxi- 
mately eleven  percent.  There  is  a  definite  relationship  between  labor  and  material 
used  and  financed  under  these  maintenance  allotments,  and  the  allowance  for  labor 
will  be  found  to  be  a  definite  proportion  of  the  maintenance  allotment.  There  is, 
therefore,  only  a  certain  amount  of  money  that  can  be  spent  for  labor,  so  that 
when  the  hourly  wage  is  increased  it  is  plain  that  less  man-hours  can  be  utilized, 
thus  curtailing  employment.  The  railroads  must  find  a  way  to  accomplish  main- 
tenance work  with  the  reduced  number  of  man-hours  available.  They  are  forced  to 
use  mechanical  aids  and  to  make  capital  expenditures  for  heavier  rail,  better  ballast, 
treated  ties  and  track  drainage  and  stabilization  projects,  all  of  which  result  in  a 
more  permanent  roadbed  and  track. 

With  a  diminishing  power  to  employ,  and  the  necessity  of  providing  adequate 
maintenance,  it  becomes  necessary  to  extend  the  use  of  machinery.  I  have  drawn 
and  present  herewith  certain  statements  which  show  the  breakdown  of  costs  as 
between  hand  work  and  work  with  machines,  and  the  effect  which  these  machines 
have  as  a  substitute  for  hand  labor. 

In  practice,  when  considering  projects  for  mechanization  that  show  less  than 
IS  to  20  percent  return  on  the  investment,  there  is  less  incentive  to  mechanize  than 
when  considering  projects  with  greater  returns  on  the  invested  money.  Thus  there 
are  a  number  of  what  might  be  called  "border  line"  cases,  where  even  a  slight 
increase  in  the  economic  value  of  the  machine,  resulting  from  a  higher  labor  wage 
will  definitely  put  such  border  line  cases  in  the  economically  justified  class. 

In  order  to  show  how  we  arrived  at  the  value  of  the  machines  at  the  different 
hourly  wages  (30  cents,  31  cents,  32  cents  and  up  to  40  cents)  we  have  made  our 
calculations  for  30  cents,  35  cents  and  40  cents  per  hour;  and,  from  these  calcula- 
tions are  derived  the  resulting  values  for  all  intermediate  wages.  .  .  .  The  cost  fig- 
ures on  the  following  statements  include  repairs,  interest  on  the  capital  investment 
at  S  percent,  depreciation,  and  supplies 

Portable  Power  Track  Nutters  (See  Statement  1) 

This  machine  is  used  to  remove  and  apply  nuts  in  rail  joints,  replacing  men 
with  hand  wrenches.  The  value  of  this  outfit  (two  machines)  for  curtailing  ex- 
penditures, at  the  30-cent  wage,  is  $628;  and  this  value  increases  to  $1,713  at  the 
40-cent  wage.  Six  men  are  displaced  by  the  use  of  this  outfit. 

Rail  Power  Drill  (See  Statement  2) 

This  machine  consists  of  a  gas-engine-powered  drill  for  boring  bolt  holes  in 
rail,  replacing  the  hand  drills  which  were  slow,  and  required  two  men  to  operate 
them.  The  machine  is  used  particularly  in  renewals  of  turnouts  and  crossovers,  in 
interlockings,  yard  ladders,  and  where  considerable  cutting  and  boring  of  rail  is 
necessary.  One  machine  displaces  three  men  and  as  the  field  for  their  use  is  large 
and  many  machines  are  in  use  throughout  the  country,  the  total  displacement  of 
labor  in  the  aggregate  is  large. 

The  value  of  the  machine  for  avoiding  expenditures  is  $190  annually  at  the 
30-cent  wage,  and  this  value  increases  to  $395  annually  at  the  40-cent  wage. 


Mechanization    in    Maintenance    of    Way 


Rail  Laying  by  Use  of  Machinery  (See  Statement  3) 

This  is  a  large  and  important  operation.  Where  a  full  complement  of  machines 
is  used  they  consist  of  power  nutters,  spike  pullers,  adzing  machines,  rail  laying 
cranes  and  spike  drivers.  The  value  of  this  outfit  for  curtailing  expenses  at  the 
30-cent  wage  is  $36,416,  increasing  to  $47,407  at  the  40-cent  wage.  There  are  80 
men  displaced  in  mechanizing  the  rail  laying  operation. 

The  amount  of  maintenance  of  way  machinery  which  would  be  assigned  to  a 
rail  laying  organization  would  necessarily  vary,  being  dependent  upon  the  extent  of 
the  rail  laying  program  and  the  speed  at  which  the  rail  is  to  be  laid,  as  well  as 
upon  certain  other  factors,  such  as  whether  the  track  is  placed  at  the  disposal  of 
the  rail  laying  forces  or  if  it  must  be  kept  in  operation.  On  inquiry  I  find  that  the 
value  of  the  equipment  which  we  have  set  up,  based  on  our  actual  experience,  is 
reasonable  by  comparison  with  other  railroads. 

Burro  Crane  (See  Statement  4) 

This  is  a  small  gas-powered  crane  operating  on  the  track,  but  easily  removed, 
and  equipped  for  loading  and  unloading  dirt,  rail  and  other  material.  It  has  many 
uses,  particularly  around  yards  and  terminals.  A  record,  covering  a  working  period 
of  180  days  on  a  large  eastern  railroad,  shows  37  days  loading  scrap;  22  days  load- 
ing and  unloading  rail;  100  days  ditching,  including  loading  and  unloading  dirt; 
and  21  days  handling  heavy  miscellaneous  material.  The  comparative  costs  indicate 
an  annual  curtailment  of  expenditure  of  $3,133  at  the  30-cent  wage  and  $4,812  at 
the  40-cent  wage,  and  11  men  are  displaced  by  the  use  of  this  machine. 

Air  Mechanical  Tamping  Outfit  (See  Statement  5) 

Our  field  tests,  in  which  cost  records  are  carefully  kept,  indicate  the  necessity 
of  considering  all  costs  for  maintaining  track  over  the  cycle  of  years  during  which 
the  mechanical  or  comparative  hand  tamping  will  last  before  another  general 
rehabilitation  of  the  track  surface  becomes  necessary.  The  initial  cost  of  machine 
tamping  is  about  equal  to  or  a  little  greater  than  that  for  hand  tamping,  but  our 
records  show  that,  where  traffic  amounts  to  approximately  16,000,000  gross  tons 
annually  on  131-lb.  rail,  machine  tamping  lasts  six  years  and  hand  tamping  four 
years,  and  that  approximately  30  percent  more  intermediate  or  spot  tamping  is 
necessary  on  the  hand-tamped  track  during  the  cycle. 

The  output  for  one  tamping  machine  for  the  season's  work  is,  therefore,  calcu- 
lated and  reduced  to  an  annual  cost,  and  the  annual  cost  of  the  necessary  inter- 
mediate work  added.  Thus,  one  tamping  machine  has  a  value  for  curtailing  expendi- 
tures annually  of  $1,186  at  the  30-ccnt  wage  and  $1,678  at  the  40-cent  wage, 
displacing  three  men  annually. 

Portable  Gasoline  Driven  Unit  Tie  Tamper  (See  Statement  6) 

This  tie  tamper  is  used  in  the  same  manner  as  the  compressed  air  tie  tamping 
machine,  except  that  it  is  used  more  as  a  spot  surfacing  tool — -that  is,  one  that  is 
moved  from  place  to  place  to  tighten  track  in  various  spots  or  short  stretches, 
rather  than  being  used  in  a  continuous  operation.  You  will  note  the  rapidly  in- 
creasing value  of  the  machine  as  the  wage  rises — namely,  $187  at  30  cents  and  $493 
at  40  cents.  Each  outfit  of  four  machines  displaces  two  men. 

Ditching  in  Cuts  With  8-Ton  Gasoline-Operated  Cranes  (See  Statement  7) 

A  common  practice  in  ditching  and  banking  was  to  use  a  work  train  unit  with 
a    battery    of    cranes    and    dump    cars.  The    necessity    for    curtailing    expenses    has 


Mechanization    in    Maintenance    of    Way 


brought  about  greater  use  of  off-track  crawler  cranes  with  drag  lines  and  the  use  of 
bulldozers,  operated  by  a  few  men.  This  method  preserves  the  slopes  in  better 
shape  and  eUminates  considerable  hand  work  in  trimming  slopes  and  cleaning  up 
after  the  material  is  roughed  out  of  cuts  by  the  drag  Hnes.  The  value  of  an  outfit 
of  this  kind  for  reducing  costs  is  $21,825  at  the  30-cent  wage,  increasing  to  $23,455 
at  the  40-cent  wage.  It  displaces  17  men  and  one  work  train  crew.  This  kind  of 
work  is  a  substantial  portion  of  the  account  "Roadway  Maintenance". 

However,  there  are  many  other  uses  to  which  this  type  of  machine  is  assigned. 
One  railroad  reports  its  use  in  excavating  and  filHng  bridge  ends;  and  in  this  opera- 
tion displaces  23  men  with  a  daily  value  of  $47.15  when  calculated  at  the  40-cent 
wage.  In  another  case  25  men  were  displaced  in  unloading  20-ft.  and  30-ft.  poles 
with  a  daily  value  of  $51,  when  calculated  at  the  40-cent  wage.  In  both  these  cases 
a  work  train  was  used  with  the  cranes. 

Discer  (See  Statement  8) 

Power  operated  cars  for  discing  and  uprooting  weeds  from  along  the  border 
of  tracks  have  been  greatly  improved  within  the  past  few  years.  A  machine  of  this 
kind,  with  a  foreman,  operator,  and  3  laborers,  does  the  equivalent  work  of  a 
foreman,  2  assistant  foremen  and  87  laborers  doing  this  work  by  hand.  The  value 
of  the  machine  for  eliminating  expenditures  is  $10,957  at  the  30-cent  wage,  and 
$14,660  at  the  40-cent  wage,  and  85  men  are  displaced  by  the  use  of  this  machine. 

Scarifier  and  Ballast  Leveler  (See  Statement  9) 

This  machine  is  used  to  break  away  the  ballast  that  becomes  foul,  caked,  and 
non-draining,  about  the  ends  of  ties.  This  condition  results  in  pumping  track,  in 
which  case  water  is  held  in  the  depression  around  the  tie,  and  with  the  movement 
and  vibration  of  passing  traffic  pumps  in  and  out,  displacing  the  ballast  under 
the  tie. 

Before  the  introduction  of  this  machine  this  work  was  done  by  men  with  picks 
bleeding  these  water  pockets.  The  machine  does  similar  work  and  reshapes  the 
ballast  on  the  shoulder.  The  reduction  in  expenditures  due  to  this  machine  is  very 
substantial,  even  at  the  lower  rates  for  labor — being  $18,173  at  30  cents,  and  in- 
creasing to  $24,516  at  the  40-cent  wage.  Ninety  men  are  displaced  by  the  use  of 
this  machine. 

Weed  Burner  (See  Statement  10) 

This  car  disposes  of  weeds  along  the  track  by  buring  them  with  an  oil  flame. 
Two  burnings  per  season  are  usually  required  to  kill  the  weeds.  Compared  with 
hand  labor,  the  relative  annual  value  of  the  machine  is  $25,402  at  the  30-cent 
wage,  and  $34,815  at  the  40-cent  wage.  These  values  are  dependent  upon  the  density 
of  vegetation.  The  values  which  I  have  used,  and  which  represent  my  experience, 
are  those  achieved  in  a  territory  where  the  average  normal  precipitation  is  low  and 
where  the  vegetation  is  not  rank. 

Weed  Mowers  (See  Statement  11) 

Hand  mowing  of  weeds  along  the  track  has  been  supplemented,  in  many  cases, 
by  power  weed  mowers  running  on  the  track,  and  by  tractor  power  mowers  operat- 
ing on  the  right-of-way  (off-track  machines).  The  value  of  the  track-mounted 
machine   for   curtailing   expenditures  is   $3,569   at   the   30-cent   wage,   increasing   to 


Mechanization    in    Maintenance    of   Way 


$S,09S  at  the  40-cent  wage.  Each  machine  displaces  30  men,  and  there  are  many 
such  machines  already  in  use. 

The  relation  of  fully  mechanized  operations  at  the  different  wages  does  not 
show  substantial  differences  due  to  the  relatively  small  number  of  men  necessary 
with  mechanical  operation,  yet  at  the  40-cent  wage  it  means  that  approximately 
one  more  man  is  displaced  for  each  additional  machine  put  into  use.  Due  to 
climatic  conditions,  there  is  more  need  for  discers,  weed  burners  and  weed  mowers 
in  the  south  and  southwest  than  in  other  parts  of  the  country. 

Power  Jack  and  Power  Tamper  (See  Statement  12) 

These  machines  are  used  together  in  large  reballasting  or  track  raising  jobs. 
The  value  of  4  power  jacks  and  2  power  tampers  for  curtaiKng  expenditures  is 
$37,244  at  the  30-cent  wage,  increasing  to  $52,576  at  the  40-cent  wage.  This  com- 
bination of  these  machines  displaces  106  men.  These  machines  have  been  developed 
within  the  past  few  years  and  are  not  as  yet  in  general  use.  A  few  of  them  have 
been  in  use  for  sufficient  time  to  prove  their  value.  .  .  . 

Auto  Truck  Crane  (See  Statement  13) 

This  machine  is  used  to  considerable  advantage  around  large  terminals.  The 
statement  is  based  on  an  actual  record  of  performance  for  252  days,  and  the  results 
are  shown  to  be  a  curtailment  of  expenditure  of  $7,405  at  the  30-cent  wage  and 
$9,350  at  the  40-cent  wage.  An  average  of  eight  men  were  displaced  in  this 
operation.  The  machines  are  programmed  in  accordance  with  the  working  season 
on  my  own  railroad,  where  cUmatic  conditions  interfere  to  a  considerable  extent. 
In  southern  and  southwestern  territories,  where  a  12-month  working  season  is  pos- 
sible, it  is  apparent  that  the  value  of  the  machine  is  increased.  .  .  , 

Use  of  Heavier  Rail  (See  Statement  14) 

The  problem  of  selecting  the  economically  justified  weight  of  rail  for  a  certain 
line  of  railroad  carrying  a  known  amount  of  traffic  per  year  involves  consideration 
of  relative  annual  investment  and  maintenance  costs,  and  these  costs  are  affected 
by  the  life  of  the  different  weights  of  rail. 

The  AREA  Committee  on  Economics  of  Railway  Labor,  of  which  F.  S.  Schwinn 
was  chairman,  appointed  a  subcommittee,  E.  T.  Howson,  chairman,  to  study  this 
subject.  Quoting  from  this  report,  which  is  recorded  in  Proceedings,  Vol.  40,  page 
340:  "For  lines  of  heavy  traffic,  savings  by  use  of  112-lb.  and  131-lb.  rail  in  place 
of  100-lb.  or  lighter  rail  may  reach  40  percent  of  the  total  expenditure  for  track 
labor.  As  volume  of  traffic  decreases,  savings  and  labor  costs  decrease  until  factors 
other  than  labor  saving  must  justify  the  use  of  heavier  rail." 

The  AREA  Committee  on  Economics  of  Railway  Location,  of  which  H.  M. 
Stout  is  chairman,  appointed  a  subcommittee  under  C.  H.  R.  Howe  to  study  this 
subject.  Quoting  from  this  report,  which  is  recorded  in  Proceedings,  Vol.  40,  page 
130:  "As  maintenance  costs  per  unit  of  traffic  handled  are  greater  in  proportion  to 
the  inferiority  of  the  track's  physical  structure,  it  is  evident  that  the  remedy  Ues 
in  bettering  conditions.  In  any  given  case  it  is  obvious  that  the  limit  of  justifiable 
additional  investment  is  reached  when  the  extra  annual  interest  and  replacement 
charges  exceed  the  yearly  savings  that  may  be.  obtained." 

The  statement  which  I  have  prepared  is  based  upon  known  facts  as  to  life  of 
100-lb.  and  131-lb.  rail  in  our  tracks  at  locations  where  the  annual  traffic  amounted 
to   16,500,000  gross  tons  per  mile,  and  where  the  cost  of  current  maintenance  is  a 


Mechanization    in    Maintenance    of    Way 


matter  of  record.  These  details  check  very  closely  with  similar  information  developed 
in  the  committee  studies  to  which  reference  is  given  above.  .  .  .  You  will  note  that 
the  curtailment  of  expenditures  at  the  30-cent  wage  is  $95  and  at  the  40-cent  wage 
is  $133  per  mile  of  track  annually. 

Stabilization  of  Roadbed  (See  Statements  15  and  16) 

By  stabilization  I  mean  providing  a  roadbed  of  uniform  weight  and  supporting, 
ability,  free  of  slides  and  soft  spots  due  to  poor  drainage  and  other  causes.  Track 
maintenance  costs  per  mile  vary  to  a  considerable  extent  as  between  one  mile  and 
another  in  the  same  territory.  In  order  to  show  this  clearly  I  have  had  prepared 
two  statements — one  for  an  important  high  speed,  dense  traffic  territory  and  the 
other  for  a  less  important  branch  line.  These  statements  show  both  the  normal 
maintenance  per  mile  and  the  excess  maintenance  per  mile  caused  by  improperly 
drained  and  unstable  roadbed— these  figures  being  taken  from  actual  records  and 
experience  of  the  track  foremen  and  supervisors  in  both  instances.  The  statements 
show  the  annual  man-hours  of  maintenance  per  foot  of  soft  track  before  stabiliza- 
tion work,  after  stabilization  work,  and  for  normal  maintenance,  the  gross  cost  of 
the  projects  at  the  different  wages,  number  of  men  displaced,  and  annual  curtailment 
of  expenditures  at  various  wages. 

Statements  showing  specific  stabilization  work  on  the  International-Great  North- 
ern Railroad  at  Long  Lake,  Texas,  (Statement  17)  and  on  the  Gulf  Coast  Lines  at 
Beaumont,  (Statement  18)  are  typical  of  many  selected  points  throughout  the 
country.  You  will  note  the  curtailment  of  expenditures  in  the  first  case  is  $1,109  at 
30-cent  labor,  and  $1,441  at  40  cents.  In  the  second  case  the  curtailment  is  $2,461 
at  30-cent  labor;  and  $3,046  at  40  cents. 

During  the  past  seven  years  one  railroad  has  effectively  stabilized  approximately 
185  miles  of  roadbed  by  various  methods,  such  as  driving  ties,  poles  and  piling, 
and  by  use  of  concrete  and  timber  slabs.  The  curtailment  in  man-hours  obtained  as 
a  result  of  the  stabilization  of  these  "soft  spots"  is  25  percent,  as  follows: 

To  maintain  one  mile  of  track  having  unstable  roadbed  12,800  man-hours  per  year 
Maintaining  same  mile  after  stabilization  9,600  "  "      " 

Curtailment  per  mile   3,200  "  "       " 

Curtailment  on  185  miles   592,000  "  "       " 

The  annual  displacement  was  242  men.  Curtailment  of  expenditures  at  the 
30-cent  wage  would  have  been  $177,600,  and  at  the  40-cent  wage  would  have  been 
$236,200. 

Further  in  Mr.  Faries'  testimony,  he  found  it  desirable  to  evaluate  the  effect  of 
what  might  be  considered  complete  and  properly  balanced  mechanization,  using  equip- 
ment now  available,  and  to  compare  this  with  all  hand  labor.  He  said,  in  part: 

I  have,  therefore,  taken  an  assumed  railroad  having  1,200  miles  of  main  track, 
provided  with  necessary  ballast  cars,  derrick  cars  and  similar  equipment,  but  with- 
out any  of  the  more  modern  types  of  maintenance  of  way  machinery,  and  based 
upon  my  knowledge  of  average  requirements,  assigned  the  proper  balanced  number 
of  the  different  types  of  machines  which  I  would  consider  desirable  and  economical 
in  mechanizing  such  a  railroad.  This  list  of  machines  is  given  on  Statement  19. 

During  the  several  working  periods  assigned  to  the  different  machines  they 
would  displace  714  men,  and  this  would  be  equal  to  270  men  for  a  complete  year. 
The    investment    required    to    accomplish    this,    based    upon    present    costs    of    the 


Mechanization    in    Maintenance    of    Way 


machines,  would  amount  to  $160,970,  equivalent  to  an  investment  of  $603  in  main- 
tenance of  way  machinery  for  each  man  displaced  for  an  entire  year  and  for 
convenience,  I  have  used  the  sum  of  $600  for  the  calculations.  .  .  . 

Toward  the  end  of  his  testimony,  Mr.  Faries  gave  an  interesting  review  of  the  entire 
subject,  which  follows: 

Reorganization  of  Maintenance  Work 

The  introduction  of  machinery  displaces  labor  in  considerable  numbers,  vary- 
ing with  the  type  of  machine  and  the  size  of  the  gang,  and  this,  coupled  with  the 
introduction  of  heavier  rail,  better  ballast,  treated  ties,  drainage  and  stabilization 
improvements,  has  permitted  and  in  fact  necessitated  a  change  in  maintenance  of 
way  work  organizations.  Large  specialized  gangs  with  adequate  machine  equipment 
frequently  take  care  of  the  bulk  of  the  heavier  work.  The  work  of  the  section 
forces  has  been  in  many  cases  reduced  to  patrolling  and  inspection  and  what  might 
be  classed  as  minor  running  repairs.  This  has  permitted  a  considerable  lengthening 
of  foremen's  sections,  thereby  abolishing  many  such  sections. 

In  the  report  of  AREA  Committee  22 — Economics  of  Railway  Labor — on  the 
subject  "Effect  of  Recent  Developments  in  Maintenance  of  Way  Practices  on  Gang 
Organization",  which  extended  over  a  period  of  years  and  was  concluded  in  Vol.  39, 
pages  589  to  594,  there  will  be  found  many  cases  covering  representative  roads  in 
all  parts  of  the  country  indicating  the  justification  for  reorganization  of  forces  such 
as  I  have  described.  The  final  conclusions  of  this  committee  were: 

"1.  The  specialized  gang  is  an  economical  maintenance  of  way  unit. 

2.  Continued  use  of  such  gangs  by  any  railroad,  results  in  increased  efficiency 
of  the  gangs. 

3.  Specialized  gangs  permit  maximum  use  of  power  tools  and  best  justify  the 
investment  in  such  tools." 

In  reviewing  the  actual  experience  of  one  railroad  in  the  eastern  district,  as 
reported  by  Committee  22  in  Vol.  33,  pages  372,  380,  a  detailed  assignment  of  man- 
hours  displaced  by  the  several  causes  involved  is  given.  There  had  been  a  reduction 
of  4,385,302  man-hours  per  year  and  the  major  portion  of  this  reduction  was  defi- 
nitely assigned  aS  follows: 

Use  of  treated  cross  and  switch  ties   703,432  man-hours 

Use  of  heavy  rail   365,610  "  " 

Reduction   in   mechanical   wear   to   ties   and   improved   cross-tie 

distribution   317,776  "  " 

Change  in  methods  of  patrolling   500,000  "  " 

Reduction  through  use  of  specialized  extra  gangs 981,612  "  " 

Reduction  in  repairs  to  roadbed  as  a  result  of  stabilization,  im- 
proved ditching  and  similar  causes   484,386  "  " 

The  results  for  this  road  indicate  the  extent  to  which  it  has  availed  itself  of  the 
several  labor  displacing  influences  to  which  I  have  referred. 

It  is  also  of  interest  to  quote  from  the  AREA  Manual  of  recommended  prac- 
tices. On  pages  22-2  and  22-3  we  find: 

"Recent  developments  in  maintenance  of  way  practices,  such  as  the  use  of 
improved  materials  and  labor-saving  devices,  have  reduced  the  amount  of  track 
labor  required  for  adequate  maintenance.  These  developments  permit  the  transferring 

Text  continued  on  page  25. 


Mechanization    in    Maintenance    of   Way 


«•    S 


o  o  o 


°  a 


t-l  s 


*• 

s 

s 

^ 

4» 

rH 

a   g 


q  e>        o    •        BO  f-j 

tH    E  tf3    O  CO  J3 


+»        PC  > 


+>   ft  P.  5 

as5s. 


E    2 


IrH    «   rH    to         H    ■ 


I  i-e 


Pk  b  0,  PS       O  <     t-c 


Mechanization    in    Maintenance    of    Way 


&si 


••a 


1^ 


15 

M 


•Ol       >A 

'1  H 


u\  p        Ol       O 


5^  ^  i 

E  ^  2 


ii 


o,  s 


q]    O    O 

►4  +>|2; 


Tl  ■ 


^  I      I  rrtsO  < 


I  CM  ^  rgl  UN 

-^  I  s 

CM  Irt  O 

- 1 :. 


11      ' 


ss 


f    2      8 

CO        kg 

j5   a, 

«*  <  X 


**    go;    ^ 

t.  u    >«,        -ri  a 
5 :?     "^  o      &"£ 

I     ^  •     41 

V   «   as       5 

•^-  Stall 


g  1 

rH    r-t 

■51 


<d  o 


a.  A 


ii 


«.erv      t^cNi 

s 

°  .     £"3 

^B     -33 

s 

Deprec 
Suppll 
Runnln 
Annual 

OS 

(d 

5S5 

o  ^^o 


10 


Mechanization   in    Maintenance    of    Way 


o  n 
■-"  I 

8 


O  O 

I  o  t^ 


O  CM  00 

o  t^  a 


00  CM   40  CM 


1    I    I  o  q    I    I  < 


fi<  »-  IS  (H  r-  e-  ' 


U    MO   O  O  O 

a  a«   CM   CM  CM 


4(4      4»^  I 


O  O  O  O  O  Q 

«  M  «)  «  M  9 

ssgga 

n  to  iQ  to  to  (0 

S3 

iH         I-*               lO 

o»  n  CM  ,- 

\a 

4» 

-» 

4» 

o  o  o  o  o  o 

CM  N  O  N  N  4> 

S3§SS 

723 
756 
113 
755 
755 
606 

'lis^s 

g 

o 

o 

CO 

rH          (H                lO 

<J>  jO  CM  ,- 

o 

4» 

s    s 


^  s 


I   U>  O)   U1    <H 
I  to  O  OO  O 


©OH 
U    O    <S   • 


11 


jnatBiiii^  »Bf  Mn.  ^n  j),p,y, 


•or*  rpUn  l.a»or  . 
Crm»l«r  Cma«  .... 


LATIlr.  Mil. 

n«0HS 

AlaUiBwi   

^^▼li«  R&ll  Aaolwra 
RaUag  Splk.. 


tttlllng  Us»d  SpltM  

0«iBittlng 

Oiy-io«tyl«!i.  Ootttr 

£«BOTli^  b'plioaa 

ZhroTlQg  Otot  ^11   

EmoTing  II.  pi»t« 

Scoring  3«Ilait    (f(w  Mj«rs] 
3riTin€  i>OBu  Split*  Stabf 

s«cu&£  n«  piu^  

arlTin*?  ?1«  Flns3 

Idling  ?!•■  

Cr^osotli^  Idled  Tl«a 

L&ylns  OB  Tl9  PlACes  

Oea^mg  Tie  nstta 


S<tUB£  li  aul   (Ebrro  Cimnal 

Grladloe  Ms*r  Bits  

UbnotlBg  B<11  fcd 

IpplTlog    S^los 

Applyl^  BoXti  


Ssigliig  Ball  

Startli«  Sfltm  

Srlrlof  %lksfl  (C^q)r«isorl  .. 
t%>lU  IrtTMl 
Dnnsg  Uned  3six»t 
ApplTlB^  Ibll  Aaabori 
ifrpljiiig  Bead  WIT— 
■.t.  Sapelisu 


&«&«r«l  roroaan 

Clark 

POKT  Ball  Drill   tt7  Isttar  Oparatorl 
lotala 


Vork  Train  La^or 

Vork  Trala  Xzpaua 

Cravltr  Crana 

toTBas 


lotala 


(.SM.  par 


OoMlaaary  =i 

ftial  M»l  oil  for  Caiap  rraln  .... 

Ce/Mf  trala  -  16  Bsak,  *  Utility,  * 
QiBna^  1  Eltchvi,  S  3«z  Bad  6 
Flat  Cara  (SS  Cara)   

TzaAk  Cara   - 

milar  Tara  


aola  (far  Ml 
Totala  


SBAJOt  T02AJ.   . 


THE  PB1N3n.TAHIA  BiJLIClD  CMPAnT 

CUtfAfllSOJi  or  COST  OP  Lkiim  RAIL  .  Daim;  mcmirat  V3  atirn  i.tnni. 
otpjniTT  nno  -  m  tt.  rails  pm  my  _ 

BY  MACHIHK 

IJeprec-     Annuel      Running 
'Dtnrflat    latlnn      0>>Hrhwn1    Rftpaif      3nTTpT  1  wa 


2«.80l 
7.69 
9.M 
t.72 
7.66 
9. Si 
7.66 
42.24 
16.36 
19.20 
16.36 
32.72 


,*» 

7.66 

.46 

23.04 

•  E9> 

.46) 

.48 

116.20 

.46 

61.44 

.69 

4.721 

.46 

16.361 

.46 

7.66 

.46 

16.16 

.671 

.tt] 

.87 

6.96 

.59 

4.72 

.46 

16.36 

uj.se 

41.70 

a7.<So 

10.77 

.69 

4.72 

3.05 
1.29 


3.34 
1.41 


tioist 


{iits6 


.51 

1.03 

2.06 

4,69 

16.67 

.741 

7.40 

2.72 

3.56 

2.66 

1.60 

4.26 

.4615/8 

19.20 

162.9ellla7 

13.03 

a. 69        16.20 


t22.12     #19.07 
$36.94     $46.70 


26.00 
26.00 
22.14 
19.20 
13.03 

K,K 

169.67 


3.64 

38.66 

7.68 
16.04 
13.82 
7.66 
3.84 
7.68 
42.24 
16.96 
19.20 
16.36 


19.49 
115.20 


6.96 
4.72 
15.36 


4.72 
t26.66  tT36.08 


25.00 
25.00 
22.14 
19.20 
13.03 

1169767 


66.33 

5.90 
6.50 


.741 
.46)6/6 
162.96)167 


MACHIHBRT     t     TOOL       COST 
^^'  D«prec-     Anrroal     ftznnlng 

_ifiit       Intarcat  latlon     Ot«.«|hi1    RtTBlrj.     3iipnll». 


26  Soni,   7  Otlllty,   7  Dlnara, 
2  Kitchen.  4  Box  and  2  Flat 
Cara  (46  Cara)   


19.20 

13.03 
66.20 
119.83 


3.64 
64.46 


.46 

15 

36 

67 

.62) 

60 

.46 

23.04 

.59 

23 

60 

162 

96 

69 

50 

237 

00 

10 

77 

69 

4 

72 

.74) 

7.40 

.46)6/6 

19.20 

152.95)IlaT 

13.03 

_     .  ,    ,      ($6.00  per  Ho.) 
Hand  toola    (j  ^jj  ^„  j.^. 


♦  »  » 

2.06  4.63  16.67 

2.68  1,60  4.26 


122.66 
11.62 
7.66 
7.68 

69.12 
7.68 
7.68 

23.04 

30.72 
115.20 


65.20 
$119.63 


93.16 
11.10 
12.00 


36.01       29.40 


16.00 
.64 
1.00 


26.00 
26.00 
22.14 
19.20 

18.03 
66.20 
169.67 


T.ia 

S.M 


T.6S 
3.64 

T.tS 


11.52 
7.68 
7,66 


S0.T2 
UE.n 


IB.  36 

EB.ao 


U.0* 
23.60 
69.30 
10.77 
4.72 
7.68 
$949.39 


25.00 
25.00 
22.14 
19.20 
13.03 

»169.57 

93.18 
11.10 
12.00 


100.49 
4.79 
1.56 


55.43 
278.55 


$36.66     (30.73       (19.64         (3.26 
(1,169.05     (42,12     (99,91       (29,32       (15.94     (230.74         (1,547.08 


Coat  1989  he-tOT  Beta,   (.46  per  tear. 


boat  c/141ne  Federal  Pecaloi  and  Unaoploynant  Ineoraioe. 


mrT^^  miyiY  FOB  L>rinr.  ii.|i, 

Bplke  Hillera   (  4,923, 

Fertile  Poaer  Track  Sntters  4,146. 

Tie  Adaera   9,620. 

Borrfl  Craaa   7,640, 

0<apr*aaDr  -   210  on.   ft, 4,603. 

Air  Spike  Dnvera   1,347, 

Poaar  6onMo«  UacMaea   1,311, 

Foaer   Ball   Drill    S32. 

OxT^^Acetylan*  Ontflt   5j^ 

pffaer  Grinder 

lo"!    (34.273, 


3pare) 
Spare) 
Spare) 


Mechanization    in    Maintenance    of    Way 


11 


•  MO 


KJ>  O  (U 

%^  u  tc 


■^a|3 


«s 


a  o 
o  ^ 


■H     CJ       <£>   CO   I 


ifi  (s  »r 

SSSi 

3fl 

a  0 

Si 


S^ 


as* 

a  to  <n 


^      O.       Oi 

5  S   (2, 


S     3] 

o      o 


>-)•-)»  o  o 


£U". 


12 


Mechanization    in    Maintenance    of   Way 


fH  iH  O]  ^  HlO* 


p-  B 


»K' 


ga 


u  a  a 

S  S  S  oJ 

•p  o  to  f< 

m  *  .H  P 

o        rt  ^ 

"  £  .  ^ 

e  3  a 


P^ 


w-i 


ISS, 


^    cm' 

cc 

•-A  lf> 

in 

•H 

? 

o 

(O 

«> 

4»> 

4» 

<^ 

ph  .M  a  « 
•^  s  sc  f< 


*  M 


Mechanization    in    Maintenance    of    Way 


13 


::s 


8SS 


5  ^ 


»H  rH  tola) 


ISS 


«ll 


.  l->  ►J  « 

•-I  •H'4'l'fi 


£2 


m 

cr* 

^• 

ei 

4» 

.H 

10 

r-t 

5  ° 


S  S  ^  S  5- 


to  (0  ■* 
A>  V  •*> 

<  <  < 


14 


Mechanization    in    Maintenance    of    Way 


*.1 

O  Pi 

*•  M 
m  h 
o  o 


-I  a 
o  o 


^   o  o 


o  o   ^ 

CD  CO    (O 


g  88  3  S 

to    (DO)    "^.   ^. 
4»   <»     «» 


a 

8  8 

-* 

?; 

s 

ill 

o> 

o 

-*  ■* 

n 

« 

«» 

4» 

<» 

«  m  P4 
>«  I  s 

a  o  o 


a  a 


■  <-l  0>  Q 

I  00  in  9 


4*  (4  h  9 


111 


ft  h 

«6 


^  £  • 


m  Q  iQ 

03  9  lA 


■as 

ts 

a»  CO  O) 

p 

saa 

a^ 

n  in  o 

""  *  S 


CC  PC  « 


Mechanization    in    Maint  enance    of    Way 


IS 


§  i 


£1^ 


tU>  r*^  «~*      O   I 


O      -^    1         sO 


S3 


a-  => 


is.- 

bh  O  < 


S"S5: 


16 


Mechanization    in    Maintenance    of    Way 


M         S 


P<  h 


ss 


in  w  CT»  -sU  to   (h 


lO  cj  o*  »*  *o 
o  o  o  <o  in 

"^i"  0)  W  «H  CO 


■)->   to  in  «o 


Mechanization   in    Maintenance   of   Way 


17 


u^u^^ 


u,  •<  _j         a 

-*  ^  ^        lo 

^        1^ 


o  ^  <T>- fno 


S*ff; 


O  ^  (r*  '*^  o 


I    s 


a.  3 


o   a   Id 
Ui  <  Jf 


fi    !,-' 

Fe 

^    Si 

3-^SS 

W    I. 

^*-E 

tt 

c   t. 

5:3  <§• 

u.  ^ 

L^ 


>   o    cd    o    4   S 

9i  a  u,  Ji :« 


I  ^ 


C    «    3    3    c 

i-i  Q  w  ec  ■< 


rs4  rn  'O 


3   s,e.R 
£1  -^-^-^ 


<  <  < 


18 


Mechanization    in    Maintenance    of    Way 


vo   m  I     <y\ 


t  ffvirx  CO     f    I       "N 


?s^S 


I   S 


1  OS  ir\  CO      U^ 


f-l  Q  O  f>J  irl 


'^1 


.  o  J  a  I 


♦J  tt  a,  c  c 
c  u  3  3  c 
i-<  a  in  K  -i 


\^3 


1    z 

fc- 

^ 

s 

« 

1     '^ 

^ 

Fj 

Si 

+J 

•3 

a> 

rH 

';S 

^ 

s 

u  a 

Kl"* 

♦> 

3 

o  -3 

ir,1 

**,,. 

g 

s^ 

•H-S 

OS 

■^ 

•a 

■ji-a 

*     ♦> 

,? 

% 

■S5  s 

u  'S 

-H 

1 

Mechanization    in    Maintenance    of    Way 


19 


U  S-. 


3     a 


'  3    E 


1  (js  (Ts  ^   O 


fl 

&S: 

t'Att 

a  a  «  » 

•a 

o 

£5IS^S 

'^ 

"-4         O   O 
rH  O   O 

f\j        o  o 


&u 


o^  -*  o  *^ 

CO  t-  o  o] 

O    «*^nO  Oj 

eg  UN        <N^ 
5   O         U\  C^  ■«*   O  vOl 

3  o       lJ^a)  c^  o  ol 

f   ^  O   O   ^  '*!  Ol 


s    . 


H       o  ■*»■      o  ••^u^ 


i^g 


33     §' 


0.  13 


>  a  c 


■9,2 

"jo's             i-e'  '.  5^"^5 

«V                      OO  uo^-^d 

[mb.                     Mi*  «UU.c3 

t^"^  5  sis  I 


<•■<  ■« 


20 


Mechanization    in    Maintenance    of    Way 


e  M 

T  lO 
M  N 


»  9  tM  CO  < 


lO  P-  CD  to  M  CD  < 


I  Q     *  « 

>  ro  c\i  c 


CI  3  e   t    rt  3  I 
o  o  o  o 


t>-  00  ^  ^  o  m  tf> 

ey  M  <-t  O  M  M  CV) 


o 

o 

?? 

' 

fi  e 

s  s 

a 

?i 

o 

£) 

b 

u 

S 

E^*  fJ  E^  SB 

^  E  25 

©OOP. 


«  CO  p  ^  a 


tf:  m      lo  < 


3  S 

H 

-*  C^  «J 

r-  c^  o 
lO  c^  -*« 

)■> 

<» 

■<<* 

*► 

ii 


6S  . 


©o  •^^'-'      OtHg** 


iH  t^  «  f-  to  r-l 
W  rH  in  CO  00  O 
^£^  CO-tO  *0   C^    to 


c^  to  «  .-<  oj  -*• 


I   f^   t*    u    ^ 

li4    fr,    fr,    h    g    Cc 


1 


»    «/    3 
"    "    O  il 

ig^2 


j=  -H  -•    a  • 
o  -c  -a    fi  . 


l!?» 


5  a       D,  (. 
1    ^   o        4>   «> 

4*    Pi  O    p4  a    B 

3 £c^  S S  ^ 


&:  q:  p; 

♦*■♦»+» 

<  <  < 


Life  o 
Life  o 


Instal 
Mate 
Labo: 
Work 


1st  Gei 

Fork 

1  I 

laoip, 

1  I 

m 

Wo) 
Ball) 
toi   ' 
Woi 
Tloi 

2nd  Gei 
Fork 

asc 

Tainp; 

1  ( 

ffoi 

Vol 

Ballj 

■.Voi 

*oi 

Jolnl 

T\ 

prJ 

Grind 

11 

Trs 

3rd  Sax 

Fork 
and 

Tangjl 
1  C 
7or 
*or 

Balls 
Hot 
War 

Joint 
Ref 
1  * 
prs 

Grind 
11 
of 

Inter 


3^  '» 

SC 
G  = 


IK,  17ITH  TRAFFIC  OP  16.5  UIIXIOK  QR033 


r^s«^  tarra:  taa?  -  Foe-  IsBt&U&UcB..... $  79.01       I 

;  :^«r»;s-  aa&  17  :«h»^r»  -  7CO'  per  d^ 6*.Z8 

*K*  :s»ia-  :■««« 

»or«  =r*i2  -  >»i3* 

^'  '.M^iJ^  -  Ij-TOjiap  *  Lvnllsg  vis  of  9C» 

%^ IS^Z  40.< 

a=r*  Erxli  -  Si^es      l/lS   i^l 

»:«  SrxiE-  :spe=<-   !  1   :=  d^i 

«a£   2:    -ftiTva  -   6CCJ  par  d^ 62.13 

*"""~'^  -  l-pc^l^  k  I«Talias  l/U   of  900   zass  16. Z2  40. < 

*sa  :r»lx  -  ^i^e=»«"l  1,15  i«^r,m!l!^.!!... 

1    ?SVB,   t    ??Kmt=-«    z=i    12   LftiW?s  -   200 

?Taek  ?er  £37 1.22 

cf  2:    la»3m  -   60C'  7K-  ijf .....^^  32.1^ 

1   3pmU:r  =i   1?  la^srvrs  -  7CC'   F*r  ds;....  &l.2a 

aorkV^  -  r.««  (1/18  tayl. '. 

ItBanmA  3«r«  -  67  »•  of  ?o«w  7mX  Mottmr, 

1  '««eK^  £   >SWz«t0r«  *   12  I&rcr«r«  -  200 

jTf.  7»  1^ 9.0Z  32.1 

U  yr«.tcr»  a£  1  Co*  -  5Tl=il=c  «-9  Mll^a 

gg  -g*^  ?»:•  d^ ^^*?f 

X»  'a^am  ?»Mtott  ^       1      ^ 


1716.60         $369.72     « 


$  33.56         $  37.SX         $  41.01         ^18.39         #372.03    $2.23  |  1.65       $8 


J.54  7.25 


le.Sl     «6.30 
1378.64    #8.63 


#1  136.36     |1  140,U     #1  143.E 


#2.51     #27.42  #634.83         |&63.] 


#601.32 
#1  745.13 


Ties  per  l^ilo  i 
Labor  Applying  i 


#1  128.66     #219.64         $416, 
$1  270.90     C^£19.64         J477 


S513.95        §457.00       # 


#517.34         #461.17        # 


Bftpairs       3iipplLas 


#1  061.18        #1  067.94       #1  C 


S5E1.24  $468.81  ill.. 


#2.S6         #36.31  #894.67  #743.25  #S03.«) 

#6.18        551.26         #1  755.85       *1  915.18       #1  373.40 


Mechanization   in   Maintenance    of   Way 


21 


sss 


i\  i 

4*1       4» 


r  I 


3   e 


H  c^  a)  eo  oo  •* 

o  lolto  in  tf>lio 

io  nlok  jo 

M         i-T  M 

4»    h*  )«» 


£1 


a  I 

O  H 

ll 

*  B 

11 
»  « 

I-  £ 


!gs 


10  c-lo  •->  hIn 
c^  niH  in  nlf-i 
n  n|^-  a> 


ssa 


8^ 


pa" 

a 

13    ^    -rH 

«  «  p 


a 

in 

s 

1 

S 

"S^ 

7>  in  in 

0>       MM 

;  * 

4» 

» 

«» 

S    9 

ss 


m  o*  S 
H  (K  t- 


^  i-l 

a-8 


,1 

!  i-i 

1-8 

a        at 

las 


a  o 

O  H 
^    S 


O    9 

«>  o 


4» 

«   4* 

O  -^ 

Pk 

•23 


E  « 


s   -a 


a      ^ 


22 


Mechanization    in    Maintenance    of    Way 


w  g^koj-^L 


f  J- j-lcaj-^  < 


;£?s| 


I  -d  ® 

!  a  a,  3 


«-a 


W   CO        M 

;  i       "da       o 


K     01 


fi^ 


Mechanization    in    Maintenance    of    Way 


23 


-1p 

sL* 

s-? 

■^A 

^   O 

W? 

ya 

SiS 

^'■i 

^  ft* 

n  o 

Rd 

SI 

^5. 

!^U 

3BI 


t4 

fl*t3 

,_! 

Ih 

t« 

fa   fa 

^?. 

>?. 

g   ll    g 

^'  ^  ^ 


■p 

5 

ftH        o       :a 

.-1 

r1 

hO  o   o 

•SH- 

g 

^a^^ 

§  w^ 

71.3  " 

^ 

g 

^ 

CL, 

^1 


>g 


!R    :x 


S     SI 


3      S 


«  O 

<H      O 

o 


24 


Mechanization   in   Maintenance   of   Way 


tj»      Ui      m 
n      >*      i-i 


3     3     55 


t^    to    "H    d 

©  o  ^  ^       to 


o  o 


B  « 


3     S 


o  in   c-  t- 


s    a 


Mechanization    in    Maintenance    of    Way 25 

Continued  from  page  7. 

of  the  heavier  routine  maintenance  work  from  section  gangs  to  specialized  gangs 
equipped  with  modern  labor-saving  machinery,  with  large  resulting  economies. 

"The  economy  derived  through  the  use  of  such  equipment  as  motor  cars,  weed 
killers,  rail  cutting  and  building-up  devices,  tie  tampers,  rail  layers,  ditchers  and 
locomotive  cranes,  has  been  demonstrated  and  their  use  is  recommended." 

From  Page  22-4  we  quote: 

"The  use  of  heavy  rail  in  heavy-traffic,  high-speed  lines  reduces  the  amount  of 
labor  necessary  to  maintain  a  given  standard  of  track  excellence. 

"This  reduction  is  both  direct  and  indirect.  The  items  affected  directly  include 
line,  surface,  gage,  joint  maintenance  and  laying  rail.  The  items  affected  indirectly 
include  tie  renewals,  cleaning  ballast  and  ballast  renewals." 

The  foregoing  quotations  have  been  selected  for  the  purpose  of  illustrating  the  eco- 
nomic value  of  mechanization.  All  of  the  testimony  having  a  direct  bearing  upon  the 
controversial  question — the  effect  of  increasing  wages  upon  employment — has  been 
omitted. 

It  should  be  added  that,  although  all  but  two  of  the  statements  here  reproduced 
represent  Pennsylvania  Railroad  experience,  Mr.  Faries'  subcommittee  checked  these  with 
similar  data  obtained  from  a  number  of  other  railroads  and  with  reports  appearing  in 
AREA  Proceedings  during  recent  years.  The  statements  used  were  found  to  approximate 
average  experience  closely. 

Your  committee  feels  that  the  matter  here  related  represents  a  fair  picture  of 
mechanization.  Unfortunately,  it  was  impossible  to  include  every  type  of  equipment,  but 
sufficient  examples  were  included  by  Mr.  Faries  to  demonstrate  clearly  the  fact  that  large 
economies  have  been  effected  by  those  railroads  that  have  used  such  equipment 
intensively. 


Report  of  the 

Joint  Committee  on  Standard  Specifications 
for  Concrete  and  Reinforced  Concrete 


Submitting 

Recommended  Practice 

and  Standard  Specifications 

for  Concrete  and  Reinforced  Concrete 


# 


Affiliated  Committees  of  the 

American  Concrete  Institute 

American  Institute  of  Architects 

American  Railway  Engineering  Association 

American  Society  of  Civil  Engineers 

American  Society  for  Testing  Materials 

Portland  Cement  Association 


♦ 


Submitted  to   Constituent  Organizations,  June,   1940 


27 


TABLE  OF  CONTENTS 

Page 

Foreword 28 

Preface  29 

Representation  of  Constituent  Organizations   32 

Committee  Organization    33 

Introduction    35 

Recommended  Practice  for  the  Use  of  Concrete  and  Reinforced  Concrete 37 

Chapter        I — Scope  and  Definitions   37 

Chapter       II— Materials   (Sect.  201-216)    39 

Chapter     III — Proportioning,  Mixing,  Curing,  and  Testing  Concrete   (Sect.  301- 

312)    43 

Chapter      IV— Forms  and  Placing  (Sect.  401-406)    SO 

Chapter       V — Details  of  Design  and  Construction   (Sect.  S01-S14)    55 

Chapter      VI — Waterproofing  and  Protective  Treatments  (Sect.  601-614)    58 

Chapter    VII— Surface  Finishes   (Sect.  701-731)    63 

Chapter  VIII— Design   (Sect.  801-878)    69 

Assumptions  and  Loads  (Sect.  801-803)    69 

Frames,  Beams,  and  One-Way  Slabs  (Sect.  804-808)    71 

Two-Way  Slabs  with  Supports  on  Four  Sides  (Sect.  809-815)..  73 

Diagonal  Tension  and  Shear  (Sect.  816-822)    77 

Bond  and  Anchorage  (Sect.  823-830)    79 

Flat  Slabs  (Sect.  831-850)    82 

Reinforced  Concrete  Columns  (Sect.  851-862)    88 

Footings   (Sect.  863-871)    95 

Retaining  Walls  (Sect.  872-877)    97 

Unit  Stresses  (Sect.  878)    99 

Standard  Specifications  for  Concrete  and  Reinforced  Concrete  102 

Materials  (Sect.  201-S— 231-S)   102 

Proportioning,  Mixing,  Curing,  and  Testing  Concrete   108 

Proportioning— Alternate  A  (Sect.  301-SA— 309-SA)    108 

Proportioning— Alternate  B   (Sect.  301-SB— 306-SB)    110 

Measurement  of  Materials  (Sect.  310-S)    112 

Mixing  (Sect.  311-S— 317-S)    112 

Curing  of  Concrete  (Sect.  318-S)    114 

Field  Tests  of  Concrete   (320-S— 325-S)    114 

Enforcement  of  Strength  Requirements  (Sect.  326-SA — 328-SA)    115 

Forms  and  Placing  (Sect.  401-S— 422-S)    116 

Details  of  Construction  (Sect.  SOl-S— Sll-S)    121 

Appendices    124 

1 — Effect   of   Various   Substances   on   Portland    Cement    Concrete   and    Suggested 

Protective  Treatments  Where  Required  124 

2 — Support  Moments  in  Continuous  Beams  and  Frames  126 

3 — Maximum  Moment  Coefficients  for  One-Way  Slabs  (Solid  or  Ribbed)  of  Equal 

Spans  Carrying  Uniformly  Distributed  Loads   128 

4 — Curing  Portland  Cement  Concrete   129 

S — List  of  Specifications  Cited  130 

Index    133 

i 


28  Report    on    Concrete    and    Reinforced    Concrete 


Foreword 

The  report  of  the  Joint  Committee  is  a 
very  valuable  document  designed  to  cover 
specifications  for  every  phase  of  concrete 
and  reinforced  concrete  construction  in 
widely  divergent  fields  and,  while  within 
its  scope  it  necessarily  includes  the  design 
and  construction  of  structures  for  railway 
purposes,  it  does  so  only  in  a  general  way 
without  emphasis  of  the  specific  problems 
entering  into  the  features  entailed  in  such 
design.  The  report  is  more  of  the  type  of 
a  master  specification  and  recommended 
practice  which  may  form  a  basis  for  any 
particular  specification  to  cover  specified 
types  of  structures  such  as  those  required 
for  locomotive  loadings.  Viewed  in  that 
light,  it  serves  as  an  excellent  guide  for  the 
formulation  of  a  specification  for  concrete 
masonry  structures  for  railway  uses. 

This  report  is  presented  to  the  Associa- 
tion as  information. 

Committee  8 — Masonry 


Preface  29 


Preface 


For  more  than  thirty  years  the  design  and  building  of  concrete  and  rein- 
forced concrete  structures  have  been  guided  and  deeply  influenced  by  the  work 
of  Joint  Committees  as  expressed  in  their  reports. 

These  committees  have  been  composed  of  members  appointed  by  national 
engineering  and  technical  organizations  which  were  primarily  interested  in  a 
safe  and  sound  development  of  the  use  of  concrete.  The  reports  indicate 
broadly  the  progress  that  had  taken  place  during  preceding  years  and  reflect 
the  developments  in  the  art  in  recommended  practice  and  specifications. 

The  periods  represented  are  clearly  indicated  in  the  reports.  The  first 
Joint  Committee  was  organized  in  1904,  a  time  which  marks  approximately 
the  beginning  of  reinforced  concrete  construction  in  this  country.  At  that  time 
concrete  construction  was  principally  in  the  hands  of  a  few  specialists  whose 
methods  varied  with  their  experience.  But  by  1916,  when  that  committee  sub- 
mitted its  final  report,  a  great  quantity  of  test  data  and  an  extensive  literature 
had  been  accumulated  which  found  expression  in  the  recommendations  of  the 
committee. 

The  first  Joint  Committee  organized  the  available  information  into  a  code 
of  practice  based  on  fundamental  principles  and  concerned  itself  with  details 
only  insofar  as  it  was  necessary  to  indicate  the  hmits  of  sound  practice.  The 
essence  of  the  first  report  is  embodied  largely  in  the  sections  on  design  which 
crystallized  engineering  practice  and  served  as  the  basis  for  building  code  and 
specification  requirements  throughout  the  country. 

The  second  Joint  Committee,  organized  in  1920,  was  charged  with  the 
duty  of  preparing  standard  specifications  for  concrete  and  reinforced  con- 
crete, using  as  a  basis  the  former  Joint  Committee  report,  with  such  modifica- 
tions as  were  necessary  to  make  its  recommendations  agree  with  current  prac- 
tice and  such  new  data  as  marked  progress  in  the  art.  The  report  submitted 
in  1924  in  specification  form  indicated  that  a  considerable  advance  had  taken 
place  in  the  method  of  producing  concrete.  The  improvements  had  developed 
to  the  point  where  variability  in  the  quality  of  concrete  could  be  reduced  by 
means  of  preliminary  strength  tests  and  controlhng  the  quantity  of  mixing 
water  through  the  control  of  the  slump.  The  compressive  strength  of  con- 
crete could  now  be  estimated  with  a  reasonable  degree  of  accuracy.  On  the 
basis  of  this  improvement  the  committee  recommended  a  general  increase  in 
the  ratio  of  working  stress  to  ultimate  strength  of  the  concrete  and  permitted 
a  corresponding  increase  in  the  steel  stress  where  high  yield  point  steel  could 
be  used.  By  standardizing  grades  of  materials,  methods  of  producing  concrete, 
and  the  details  of  design  procedure,  the  newly  acquired  knowledge  could  be 
utilized  and  concrete  construction  placed  on  a  more  definite  basis.  The  com- 
mittee completed  its  report  after  a  series  of  field  tests  had  demonstrated  that 
its  recommendations  were  substantially  justified. 

The  present,  or  third  Joint  Committee,  was  organized  in  1930  to  study  the 
extent  and  character  of  the  advances  in  knowledge  since  the  1924  report,  and 
make  such  recommendations  with  respect  to  practice  and  standard  specifica- 
tions as  might  be  warranted  in  view  of  recent  developments. 

Of  the  advances  made  in  recent  years,  relating  to  concrete  as  a  material, 
the  most  significant  are  the  increase  in  the  strength  of  cement,  a  more  wide- 


30 Report    on    Concrete    and    Reinforced    Concrete 

spread  understanding  of  the  basic  principles  of  mixtures  with  increasing 
attention  to  field  control,  and  an  increasing  use  of  ready-mixed  concrete. 

In  the  field  of  design,  the  major  development  has  been  the  increased 
interest  in  rigid  frame  analysis  which  recognizes  the  essentially  monolithic  char- 
acter of  reinforced  concrete  construction  and  provides  a  more  accurate  method 
of  stress  computation  and  hence  a  more  uniform  factor  of  safety. 

With  these  possible  improvements  in  the  quality  of  concrete  and  the  new 
tools  which  elastic  frame  analysis  places  in  the  hands  of  the  designing  engi- 
neer, very  material  advances  in  reinforced  concrete  construction  are  now  pos- 
sible. In  this  report,  the  committee  has  attempted  to  provide  a  means  of 
applying  this  new  knowledge  through  the  combination  of  recommended 
practice  and  standard  specifications. 

The  committee  was  organized  at  a  meeting  held  in  Atlantic  City,  June, 
1930,  at  which  time  there  were  present  duly  appointed  representatives  from 
the  American  Society  of  Civil  Engineers,  the  American  Society  for  Testing 
Materials,  the  American  Railway  Engineering  Association,  the  American  Con- 
crete Institute,  and  the  Portland  Cement  Association.  In  December,  1932,  the 
American  Institute  of  Architects  was  added  to  the  group  of  organizations 
associated  in  the  work  of  the  Joint  Committee. 

The  Joint  Committee  has  held  seventeen  general  meetings  and  numerous 
working  committee  meetings  in  the  intervals  between  the  general  meetings. 
The  reports  of  the  working  committees  have  been  formally  presented  to  the 
general  committee  for  action  in  detail  and  the  material  has  been  assembled 
and  edited  by  a  committee  appointed  for  that  purpose. 

In  view  of  the  extensive  changes  in  form  and  substance  of  the  report, 
as  compared  with  those  of  the  1924  report,  the  committee  deemed  it  desirable 
to  submit  its  work  for  criticism  and  discussion.  To  this  end  a  progress  report 
was  given  a  limited  circulation  and  presented  for  general  discussion  at  a  meet- 
ing in  New  York  of  the  American  Concrete  Institute,  February  26  and  27, 
1937.  The  discussion  brought  out  at  that  meeting  and  a  considerable  volume 
of  written  comments  directed  to  the  committee  have  been  carefully  considered 
and  such  changes  made  in  the  report  as  seemed  justified. 

The  last,  or  seventeenth,  meeting  of  the  Joint  Committee  was  held  in 
Atlantic  City  on  June  27  and  28,  1938.  At  the  conclusion  of  this  meeting 
there  still  remained  uncompleted  a  few  items  concerned  with  design  and  one 
on  the  general  treatment  of  the  chapter  on  Waterproofing  and  Protective 
Treatments.  The  completion  of  these  items  and  some  major  and  minor  changes 
in  the  text  have  been  accomplished  through  one  meeting  of  the  Working  Com- 
mittee on  Design  and  by  the  efforts  of  the  editorial  committee  through  corre- 
spondence and  personal  interviews  with  members  of  the  Joint  Committee. 
Revisions  of  Chapters  6  and  8  to  which  major  additions  and  changes  were 
made  were  approved  by  the  working  committees  responsible  for  these  chapters. 
These  revised  chapters  and  appendices,  and  other  miscellaneous  revisions  of 
the  text,  were  submitted  to  letter  ballot  of  the  29  members  of  the  Joint  Com- 
mittee on  December  27,  1939.  Twenty-six  members  returned  ballots.  The  re- 
vised chapters  and  appendices  received  substantial  majorities.  Some  of  the 
members,  however,  indicated  reservations  with  respect  to  individual  sections 
or  appendices,  but  the  report  as  a  whole  was  accepted  by  the  unanimous  vote 
of  the  26  members  returning  ballots. 


Preface 


31 


The   committee   submits   this   report,   not   as  the  final  word   on   concrete 
design  and  construction,  but  with  a  feeling  that  it  reflects  fairly  the  state  of 
the  art  as  represented  by  the  best  practice  of  the  day. 
Respectfully   submitted, 

A.  E.  LiNDAu,  Chairman. 


F.  E.  RiCHART,  Vice-Chairtnan 

F.  R.  McMillan,  Secretary-Treasurer 

J.  G.  Ahlers 

P.  H.  Bates 

H.   P.   BiGLER 

A.  J.  Boase 
J.  H.  Chubb 
M.  N.  Clair 
H.  G.  Farmer 
Charles  M.  Gay 
H.  J.  Gilkey 
A.  T.  Goldbeck 
M.  Hirschthal 

S.   C.   HOLLISTER 


J.    B.    HUNXEY 

F.  H.  Jackson 
Clarence  A.  Jensen 

A.  R.  Ketterson 
Charles  W.  Killam 
J.  F.  Leonard 

L.  S.  Moisseiff 

B.  Moreell 
Paul  W.  Norton 

C.  L.  Post 

N.  M.  Stineman 
m.  a.  swayze 
Stanton  Walker 
L.  W.  Walter 


June,  1940 


32  Report    on    Concrete    and    Reinforced    Concrete 


Representation  of  Constituent  Organizations 

American  Society  of  Civil  Engineers 

W.  A.  Slater,  Chairman  (June  1930  to  October  1931,  deceased);  Director,  Fritz 
Engineering  Laboratory,  Lehigh  University  (Chairman  of  Joint  Committee,  Jiine  1930 
to  October  1931) 

A.  E.  LiNDAu,  Consulting  Engineer,  Chicago  (Succeeded  Mr.  Slater  as  Chairman  of 
A.S.C.E.  group  and  of  Joint  Committee,  October  1931) 

M.  N.  Clair,  Vice-President,  Thompson  and  Lichtner  Co.,  Inc.,  Boston 

H.  J.  GiLKEY  (appointed  June  1932),  Head,  Dept.  Theoretical  &  Applied  Mechanics, 
Iowa  State  College 

C.  L.  Post  (appointed  June  1932),  Chairman,  Advisory  Committee  on  Engineering, 
Federal  Works  Agency,  Public  Buildings  Administration,  Washington,  D.  C. 

F.  E.  RiCHART,  Research  Professor  of  Engineering  Materials,  University  of  lUinois 

W.  S.  Thomson  (resigned  June  1932),  Chief  Engineer,  Kalman  Steel  Co.,  Chicago 

American  Society  for  Testing  Materials 

P.  H.  Bates,  Chairman;  Chief,  Clay  and  Silicate  Products  Division,  National 
Bureau  of  Standards,  Washington,  D.  C. 

H.  P.  BiGLER  (appointed  April  1938),  Director,  Rail  Steel  Bar  Association,  Chicago 

C.  M.  Chapman  (resigned  June  1932),  Consulting  Engineer,  New  York  City 

A.  T.  GoLDBECK,  Engineering  Director,  National  Crushed  Stone  Association, 
Washington,  D.  C. 

E.  E.  Hughes  (resigned  April  1938),  President,  Rail  Steel  Bar  Association,  Chicago 
L.  S.  MoissEiTF,  Consulting  Engineer,  New  York  City 

Stanton  Walker  (appointed  January  1932),  Director,  Engineering  and  Research 
Division,  National  Sand  and  Gravel  Association,  Washington,  D.  C. 

Portland  Cement  Association 

F.  R.  McMttLAN,  Chairman;  Director  of  Research,  Portland  Cement  Association, 
Chicago 

D.  A.  Abrams  (resigned  June  1932),  Consulting  Engineer,  New  York  City 
Ernest  Ashton  (resigned  June  1931),  Vice-President,  Lehigh  Portland  Cement  Co., 

AUentown,  Pa. 

A.  J.  BoASE  (appointed  March  1937),  Manager,  Structural  Bureau,  Portland  Cement 
Association,  Chicago 

J.  H.  Chubb,  Manager,  Service  Bureau,  Pennsylvania-Dixie  Cement  Corp.,  New 
York  City 

H.  G.  Farmer,  Technical  Service  Director,  Universal  Atlas  Cement  Co.,  New 
York  City 

J.  C.  Pearson  (appointed  June  1931,  resigned  March  1937),  Director  of  Research, 
Lehigh  Portland  Cement  Co.,  AUentown,  Pa. 

M.  A.  SwAYZE  (appointed  June  1932),  Chief  Research  Engineer,  Lone  Star  Cement 
Corp.,  Hudson,  N.  Y. 

American  Concrete  Institute 

S.  C.  HoLLisTER,  Chairman;  Dean,  College  of  Engineering,  Cornell  University 
J.  G.  Ahlers,  Ahlers  Construction  Co.,  New  York  City 

F.  H.  Jackson,  Senior  Engineer  of  Tests,  Pubhc  Roads  Administration,  Washing- 
ton, D.  C. 


Personnel    of    Committee  H 


Rear  Adjmiral  B.  Moreell  (C.E.C.)  U.S.N.,  Chief,  Bureau  of  Yards  and  Docks, 
Navy  Dept.,  Washington,  D.  C. 

N.  M.  Stineman,  Editor,  Concrete,  Chicago 

American  Railway  Engineering  Association 

C.  P.  Richardson,  Chairman  (resigned  June  1933);  Engineer,  Capital  Expenditures, 

C.  R.  I.  &  P.  Railway,  Chicago 

M.   HmscHTHAL,   Concrete   Engineer,   D.  L.   &  W.   Railroad,   Hoboken,   (Succeeded 

Mr.  Richardson  as  Chairman,  June  1933) 

J.  B.  HuNLEY,  Engineer  Structures,  N.  Y.  C.  Railroad,  Chicago 

A.  R.  Ketterson,  Engineer  of  Bridges,  Canadian  Pacific  Railway,  Montreal 

J.  F.  Leonard,  Engineer,  Bridges  and  Buildings,  Pennsylvania  Railroad,  Pittsburgh 

L.  W.  Walter  (appointed  June  1933),  Inspecting  Engineer,  Erie  Railroad,  Jersey  City 

American  Institute  of  Architects 

Paul  W.  Norton,  Chairman;  Consulting  Engineer,  Boston 

J.  C.  Bollenbacher  (deceased  1939),  Architect,  Chicago 

Charles  M.  Gay  (appointed  May  1936),  Associate  Director,  Franklin  Institute, 
Philadelphia 

Clarence  A.  Jensen,  Architect,  Chicago 

Charles  W.  Killam  (appointed  June  1934),  Professor  Emeritus,  Department  of 
Architecture,  Harvard  University 

A.  T.  North  (deceased  1933),  Architect,  New  York  City 

F.  Leo  Smith  (deceased  1935),  Secretary,  Structural  Bureau,  American  Institute  of 
Architects,  Washington,  D.  C. 


Committee  Organization 

A.   E.   Lindau,   Chairman        F.   E.   Richart,    Vice-Chairman 
F.  R.  McMillan,  Secretary-Treasurer 

Executive  Committee 

A.   E.   Lindau,   Chairman  F.  R.  McMillan,  Secretary 

P.  H.  Bates  S.  C.  Hollister 

M.  Hirschthal  P.  W.  Norton 

The  work  of  the  committee  has  been  organized  by  the  appointment  of  the  following 
working  committee  personnel: 

1.  Cement  and  Aggregates  M.  A.  Swayze 

F.  H.  Jackson,  Chairman  Stanton  Walkkk 

A.  T.  GOLDBECK,  Vice-Chairman  I-  W.  Walter 

J.  B.  HuNLEY,  Secretary 

*D.  A.  Abrams  2.  Metal  Reinforcement 

♦Ernest  Ashton  L.  S.  Moisseiif,  Chairman 

P.  H.  Bates  H.  P.  Bigler 

*C.  M.  Chapman  S.  C.  Hollister 

C.  A.  Jensen  ***E.  E.  Hughes 

*J.  C.  Pearson  J   B.  Hunlev 


Resigned.  "Deceased.  """  Resigned;   since  deceased. 


34 


Report    on    Concrete   and    Reinforced    Concrete 


J.  F.  Leonard 

A.    E.   LiNDAU 

**A.  T.  North 

3.  Proportioning  and  Mixing 

F.  E.  RiCHART,  Chairman 
*D.  A.  Abrams 
J.  G.  Ahlers 
M.  N.  Clair,  Secretary 

H.    J.    GiLKEY 
A.   T.   GOLDBECK 

F. H.  Jackson 
C.  A.  Jensen 

A.  R.  Ketterson,  Vice-Chairman 
F.  R.  McMillan 

B.  MOREELL 

**W.  A.  Slater 
M.  A.  Swayze 
Stanton  Walker 
L.  W.  Walter 

4.  Forms  and  Placing 

H.  G.  Farmer,  Chairman 
M.  N.  Clair,  Secretary 
J.  G.  Ahlers 
J.  H.  Chubb 
J.  B.  Hunley 

C.  L.  Post 

*C.  P.  Richardson 
N.  M.  Stineman 

5.  Design 

S.  C.  Hollister,  Chairman 
F.  E.  Richart,  Vice-Chairman 
N.  M.  Stineman,  Secretary 
A.  J.  Boase 

H.  J.   GiLKEY 

M.  Hirschthal 
A.  R.  Ketterson 
Chas.  W.  Killam 

A.  E.    LiNDAU 

F.  R.  McMillan 
L.  S.  MoissEir^ 

B.  a.  Moreell 
Paul  W.  Norton 

C.  L.  Post 
**W.  A.  Sl\ter 

***W.  S.  Thomson 


Res'gncd. 


Deceased. 


6.  Details  of  Construction  and  Fire- 

proofing 

J.  F.  Leonard,  Chairman 
J.  G.  Ahlers,  Vice-Chairman 
H.  P.  Bigler 

**J.    C.    BOLLENBACHER 

J.  H.  Chubb 

Chas.  M.  Gay 

s.  c.  hollister 
***E.  E.  Hughes 

Chas.  W.  Killam 

L.  S.  Moisseiff 

Paul  W.  Norton 

C.  L.  Post 
**F.  Leo  Smith 
***W.  S.  Thomson 

7.  Waterproofing    and    Protective 

Treatment 

*Ernest  Ashton 

P.  H.  Bates 
*C.  M.  Chapman 

H.  G.  Farmer,  Secretary 

Chas.  M.  Gay 

M.  Hirschthal 

Chas.  W.  Killam 

B.  Moreell 
**A.  T.  North 

*J.  C.  Pearson 

C.  L.  Post 

*C.  P.  Richardson 
**F.  Leo  Smith 

8.  Surface  Finishes 

J.  H.  Chubb,  Chairman 
N.  M.  Stineman,  Secretary 
P.  H.  Bates 
**J.  C.  Bollenbacher 
*C.  M.  Chapman 
H.  G.  Farmer 

9.  Form  of  Specification 

All  Chairmen  of  Working  Committees 

Resigned;   since  deceased. 


Introduction 

In  submitting  its  report,  the  committee  thinks  that  it  should  not  depend  entirely  on 
the  specification  form  for  presenting  its  recommendations.  It  believes  that  in  covering 
those  subjects  on  which  the  information  is  sufficiently  crystallized,  some  advantage  is 
gained  by  having  the  recommendation  in  the  form  of  definite  specifications.  The  report, 
therefore,  consists  of  two  interdependent  parts:  Recommended  Practice  and  Standard 
Specifications.  These  two  must  be  considered  jointly  as  representing  the  recommenda- 
tions of  the  committee.  Some  of  the  more  important  departures  from  the  1924  report 
are  as  follows: 

Materials. — The  recommendations  provide  for  the  use  of  high  early  strength  cement 
and  recognize  that  special  cements  may  be  desirable  for  special  uses. 

The  subject  of  aggregates  is  treated  much  more  comprehensively  than  was  possible 
in  the  specifications  of  1924.  A  working  specification  for  general  application  is  submitted 
with  suggestions  for  modifications  where  necessary  to  meet  special  requirements. 

The  use  of  lightweight  aggregates  and  the  classification  of  aggregates  on  the  basis 
of  fire  resistance  are  included. 

Proportioning. — Emphasis  is  placed  on  durability  of  concrete.  The  increased  strength 
of  cement  and  improvement  in  concrete  technology  make  it  possible  to  produce  concrete 
having  a  strength  sufficient  for  ordinary  design  purposes  with  a  water  content  too  high 
for  many  types  of  exposure.  The  committee  is  of  the  opinion  that  a  classification  or 
grading  of  concrete  based  on  the  character  of  exposure  will  be  more  generally  useful 
than  if  based  on  the  common  requirements  of  minimum  strength.  Special  emphasis  is 
also  placed  on  those  factors  which  affect  workabiUty  and  the  production  of  dense, 
homogeneous  concrete. 

Alternate  Specifications. — Two  types  of  specifications  covering  the  proportioning  of 
concrete  are  presented:  One,  in  which  the  contractor  is  required  to  produce  concrete 
of  a  specified  quality  (exposure  and  strength  considered)  with  considerable  freedom  of 
procedure  within  certain  limits;  and  the  other,  in  which  the  engineer  specifies  the  pro- 
portions required,  including  a  minimum  cement  content.  Where  the  strength  is  specified 
the  test  procedure  is  given  together  with  a  basis  for  enforcement  of  the  strength 
requirements. 

New  Developments  in  the  Art. — Developments  such  as  ready-mixed  concrete,  me- 
chanical vibration,  and  new  methods  of  transporting,  are  covered  either  as  recommenda- 
tions or  in  the  specifications. 

Design. — The  committee  has  given  special  consideration  to  the  increasing  use  of  the 
principle  of  continuity  and  the  elastic  frame  analysis  in  the  design  of  reinforced  concrete 
structures.  Since  reinforced  concrete  construction  is  essentially  monolithic  in  character,  it 
is  felt  that  these  newer  methods  are  not  merely  refinements,  but  an  attempt  to  produce  a 
more  rational  and  better  balanced  design.  Several  well  recognized  methods  of  frame 
analysis  are  available  to  the  designer  and  approximate  methods  have  been  developed  that 
permit  their  use  in  ordinary  building  design  without  an  undue  amount  of  computation. 

Columns. — The  column  provisions  take  into  account  the  results  of  researches  net 
available  when  the  1924  report  was  pubUshed,  particularly  the  American  Concrete  Insti- 
tute column  investigation  reported  in  the  Proceedings  of  the  Institute,  1930-1933.  The 
safe  loads  on  columns  are  based  on  the  ultimate  strength  of  the  concrete  and  the  yield 
point  strength  of  the  longitudinal  reinforcement,  including  in  the  calculations  the  full 
gross  area  of  the  column.  Spirals  are  not  given  consideration  in  computing  the  safe  loads 

35 


36 Report    on    Concrete    and    Reinforced    Concrete 

unless  they  are  present  in  an  amount  sufficient  to  provide  an  increase  in  the  ultimate 
strength  of  the  core  equal  to  or  greater  than  the  ultimate  strength  added  by  the  shell 
surrounding  the  core.  When  present  in  this  amount,  the  toughness,  added  by  the  spiral  in 
event  that  the  shell  spalls  or  fails,  is  recognized  by  an  increase  in  the  safe  load  25  per- 
cent over  that  for  colunms  without  this  full  amount  of  spiral. 

Flat  Slabs.— The  section  dealing  with  flat  slabs  has  been  somewhat  expanded  with 
respect  to  details  incident  to  this  type  of  construction,  but  has  not  been  altered  in  the 
basic  design  requirements.  Since  no  new  test  data  have  been  available,  the  committee 
has  retained  the  principal  limitations  of  the  1924  report.  The  formulas  for  slab  thick- 
ness have  been  simplified  and  so  modified  as  to  apply  to  concrete  of  any  28-day  strength. 

Two-Way  Slabs. — For  the  design  of  two-way  slabs,  the  committee  has  adopted  a 
method  which  recognizes  the  elastic  plate  action  as  a  dominant  factor  in  moment  dis- 
tribution and  stress  intensity.  Considering  the  limitations  of  theory  and  the  available 
test  data,  however,  the  committee  has  placed  principal  emphasis  on  the  simplicity  of 
application. 

Design  Formulas. — The  standard  formulas  for  rectangular  and  T-beams  and  standard 
notations  have  become  so  widely  recognized  that  they  are  omitted  from  the  report. 


I 


Recommended  Practice  for  Use  of  Concrete 
and  Reinforced  Concrete 

Chapter  I — Scope  and  Definitions 

101.  Scope 

This  report  is  intended  to  cover  the  use  of  concrete  and  reinforced  concrete  in  gen- 
eral. In  such  structures  as  arches,  tanks,  reservoirs,  chimneys,  etc.,  vi^here  specialization 
relates  principally  to  the  mechanics  of  design  and  details  of  construction,  the  general 
provisions  of  the  report  may  be  appUed  vi^ith  the  modifications  necessary  to  suit  the 
special  conditions. 

102.  Definitions 

No  attempt  is  made  here  to  define  all  the  terms  current  in  concrete  technology.  Only 
those  expressions  which  have  particular  application  to  the  report  and  are  not  thoroughly 
estabUshed  in  the  literature  are  included. 

Anchorage. — That  portion  of  a  reinforcing  bar,  and  any  attachment  thereto,  designed 
to  resist  pulling  out  or  slipping  of  the  bar  when  subjected  to  stress. 

Bleeding. — The  escape  of  water  from  freshly  placed  concrete,  commonly  observed 
as  an  accumulation  upon  a  horizontal  surface. 

Cantilever  Retaining  Wall.— A  reinforced  concrete  wall  having  a  vertical  section  and 
a  base,  each  of  which  resists  by  cantilever  action  the  pressure  to  which  it  is  subjected. 

Buttressed  Retaining  Wall. — A  retaining  wall  with  brackets  or  buttresses  on  the  side 
opposite  the  pressure  face  uniting  the  upright  section  with  the  toe  of  the  base. 

Columns. — A  compression  member,  vertical  or  nearly  vertical,  the  height  of  which 
exceeds  three  times  its  least  lateral  dimension. 

Column  Capital. — In  flat  slab  construction,  the  head  or  uppermost  portion  of  a 
column  or  pilaster,  designed  and  built  to  act  as  a  unit  with  the  column  and  the  slab. 

Column  Strip. — A  portion  of  a  flat  slab  or  two-way  panel  embracing  the  area  over 
the  column,  usually  one-half  panel  in  width,  used  for  convenience  in  distributing  the 
bending  moments  in  the  slab. 

Combination  Column.— k  column  in  which  a  structural  steel  section,  designed  to 
carry  the  principal  part  of  the  load,  is  wrapped  with  wire  and  encased  in  concrete  of 
such  quality  that  some  additional  load  may  be  allowed. 

Composite  Column. — A  reinforced  concrete  column  with  a  core  of  structural  steel  or 
cast  iron,  in  which  the  core  is  designed  to  carry  a  portion  of  the  column  load. 

Consistency. — A  general  term  used  to  designate  the  relative  mobility  of  freshly 
mixed  concrete  or  mortar. 

Counterforted  Retaining  Wall. — A  reinforced  concrete  wall  with  brackets  or  ribs  on 
the  pressure  side  of  the  vertical  wall  and  designed  to  act  with  it  in  resisting  overturning 
and  sUding. 

Creep. — See  Plastic  Flow. 

Deformed  Bar. — Reinforcement  bar  with  projections,  shoulders  or  lugs  on  the  surface 
of  the  bar  formed  during  rolHng. 

Diagonal  Band.— A  group  of  reinforcing  bars  placed  parallel  to  one  of  the  diagonals 
of  a  panel  in  a  flat  slab  reinforced  in  four  directions. 

Direct  Band. — A  group  of  reinforcing  bars  placed  parallel  to  the  edge  of  a  panel  in 
a  flat  slab  reinforced  in  four  directions. 

37 


38 Report    on    Concrete    and    Reinforced    Concrete 

Drop  Panel. — The  structural  portion  of  a  flat  slab  which  increases  the  thickness  of 
the  slab  in  the  area  surrounding  the  column  capital. 

Effective  Area  of  Reinforcement. — The  area  obtained  by  multiplying  the  normal 
cross-sectional  area  of  the  reinforcement  by  the  cosine  of  the  angle  between  its  direction 
and  the  direction  for  which  the  effectiveness  is  to  be  determined. 

Effective  Depth  of  Beam. — The  distance  from  the  compression  face  to  the  centroid 
of  the  area  of  the  tensile  reinforcement. 

Fineness  Modulus. — ^An  empirical  factor  obtained  by  taking  l/lOO  of  the  sum  of  the 
percentages  of  a  sample  of  aggregate  retained  on  each  of  a  specified  series  of  sieves. 
The  sieves  used  are  No.  100,  SO,  30,  16,  8,  4,  ^-in.,  %-in.,  1^-in.,  and  larger,  increasing 
in  the  ratio  of  2  to  1. 

Flat  Slab. — A  concrete  slab  reinforced  in  two  or  more  directions  without  beams  or 
girders  to  transfer  the  loads  to  supporting  columns. 

Honeycomb. — A  surface  or  interior  defect  in  a  concrete  mass  characterized  by  the 
lack  of  mortar  between  the  coarse  aggregate  particles. 

Laitance. — Extremely  fine  material  of  Uttle  or  no  hardness  which  may  collect  on  the 
surface  of  freshly  placed  concrete  or  mortar,  resulting  from  the  use  of  excess  mixing 
water. 

Middle  Strip. — The  middle  portion  of  a  flat  slab  or  two-way  panel,  usually  one-half 
panel  in  width,  and  symmetrical  with  respect  to  the  center  line  of  the  panel,  used  for 
convenience  in  distributing  the  bending  moments  in  the  slab. 

Modular  Ratio. — The  ratio  of  the  modulus  of  elasticity  of  steel  to  that  of  concrete. 

Pedestal. — A  compression  member,  generally  vertical,  whose  height  does  not  exceed 
three  times  the  least  lateral  dimension. 

Pipe  Column. — A  steel  pipe  filled  with  concrete. 

Plastic  Flow.— The  inelastic  deformation  in  concrete  resulting  from  the  continued 
application  of  load. 

Ratio  of  Reinforcement. — The  ratio  of  the  effective  area  of  the  reinforcement  to 
the  effective  area  of  the  concrete  at  any  section  of  a  structural  member. 

Saturated  and  Surface  Dry. — A  term  used  to  describe  the  condition  of  an  aggregate 
in  which  the  pores  of  all  the  particles  are  completely  filled  with  water,  but  their  surfaces 
are  free  from  moisture. 

Slump. — The  shortening  of  a  standard  test  mass  of  freshly  mixed  concrete,  used  as 
a  measure  of  consistency  in  accordance  with  the  standard  method. 

Strut. — A  compression  member  other  than  a  column  or  pedestal. 

Stiffness  Factor. — The  value  obtained  by  dividing  the  moment  of  inertia  of  a 
member  by  its  length. 

Vibration. — A  method  of  compacting  concrete  by  mechanically  producing  wave 
motion  of  high  frequency  in  the  concrete. 


Materials 39 

Chapter  II — Materials 

201.  General 

The  recommendations  of  this  committee  covering  the  quality  of  materials — cements, 
admixtures,  water,  aggregates  and  reinforcing  steel — are  embodied  in  the  accompanying 
specifications.  The  following  comments  indicate  the  basis  and  limitations  of  the  speci- 
fication requirements. 

202.  Cement 

(a)  In  the  case  of  normal  Portland  cement  and  high  early  strength  Portland  cement, 
reference  is  made  to  the  current  ASTM  Specifications  C  9-38  and  C  74-39.  No  specifica- 
tions are  recommended  for  cements  for  various  special  purposes  other  than  where  high 
early  strength  is  required.  Although  a  number  of  specifications  are  now  in  use  covering 
such  special  requirements  as  low  heat  of  hydration,  sulphate  resistance,  etc.,  the  com- 
mittee feels  that  it  should  refrain  from  sponsoring  any  specifications  of  this  nature  until 
they  have  received  the  endorsement  of  the  American  Society  for  Testing  Materials, 
which  is  the  affiliated  body  usually  relied  upon  to  sponsor  national  standards  in  th's 
field.  Until  such  standards  are  available,  the  Engineer  should  satisfy  himself  either  by 
means  of  his  own  tests  or  by  reference  to  reliable  sources  of  information  that  the 
material  which  he  proposes  to  use  will  adequately  fulfill  his  special  requirements. 

(b)  Specifications  for  special  cements,  when  required,  should  be  inserted  in  Sec.  203-S 
of  the  specifications. 

203.  Admixtures 

(a)  The  committee  considers  that  the  benefits  to  be  derived  from  the  use  in  con- 
crete of  other  than  the  essential  ingredients  (cement,  aggregates,  and  water)  depend  so 
much  upon  the  conditions  surrounding  the  individual  project  that  it  is  virtually  impos- 
sible to  write  an  adequate  general  specification  for  these  materials.  This  applies  par- 
ticularly to  admixtures  which  are  employed  for  the  purpose  of  promoting  workability. 
The  desirability  of  using  an  admixture  as  well  as  the  amount  to  be  used  depends  greatly 
on  the  characteristics  of  the  essential  ingredients,  especially  aggregate  grading,  as  well 
as  on  the  proportions  in  which  they  are  to  be  combined.  Before  permitting  the  use  of 
an  admixture  the  Engineer  should  inform  himself  thoroughly  as  to  the  advantages  or 
disadvantages  to  be  derived  from  its  use  considering  both  quality  and  economy.  He 
should  determine  definitely  the  effect  of  the  proposed  admixture  on  the  strength,  volume 
change,  durability,  and  density  of  the  concrete.  The  possibility  of  securing  the  desired 
results  in  other  ways,  such  as  by  the  use  of  additional  cement,  better  aggregate  grada- 
tion, closer  water  control  during  construction,  etc.,  should  be  investigated..  The  com- 
mittee recognizes  that  admixtures,  under  certain  conditions,  may  impart  desirable 
characteristics  which  cannot  be  secured  as  economically  by  other  methods.  However,  it 
should  be  emphasized  that  the  use  of  admixtures  cannot  be  considered  a  panacea  for  any 
of  the  ills  which  result  from  ignoring  the  fundamental  principles  governing  the  making 
of  good  concrete. 

(b)  Specifications  for  admixtures,  when  required,  should  be  inserted  in  Sec.  204-S 
of  the  specifications. 

204.  Water 

The  mortar  strength  test  is  intended  to  assure  the  use  of  mixing  water  of  satisfactory 
quality   from   the   standpoint   of   concrete   strength.  The   test   may    be   waived   in   cases 


40 Report    on    Concrete    and    Reinforced    Concrete 

where  the  water  to  be  used  is  of  known  satisfactory  quality.  Practical  experience  as 
well  as  results  of  laboratory  investigations  indicate,  in  general,  that  any  water  which 
ran  be  safely  used  for  drinking  purposes  will  be  satisfactory  for  use  in  concrete. 


Aggregates 

205.  General 

In  preparing  its  aggregate  specifications  the  committee  has  utilized,  insofar  as  pos- 
sible, the  specifications  of  the  federal  government  and  the  existing  standards  of  such 
specification  writing  bodies  as  the  American  Society  for  Testing  Materials,  the  American 
Association  of  State  Highway  Officials,  and  the  American  Railway  Engineering  Associa- 
tion. Attention  is  directed  particularly  to  the  fact  that  in  the  case  of  many  of  the 
requirements  for  quality  two  test  limits  are  shown,  a  recommended  limit  and  an  outside 
permissible  limit.  This  arrangement  is  in  recognition  of  the  fact  that  specifications  for 
such  locally  occurring  materials  as  aggregates  must  be  based,  to  a  certain  extent,  upon 
the  available  material.  The  recommended  Hmit  should  be  specified  in  all  cases  where  it  is 
economically  practicable  to  secure  materials  conforming  thereto.  When  it  is  considered 
necessary  to  use  aggregates  not  meeting  the  recommended  limits,  less  restrictive  hmits 
may  be  specified,  but  this  fact  should  be  recognized  in  the  design  of  the  concrete  mixture 
and  in  the  control  of  the  concrete  during  construction.  In  no  case  should  hmits  beyond 
the  maximum  permissible  values  indicated  be  specified. 

206.  Fine  Aggregate  Grading 

Attention  is  called  to  the  fact  that  the  relatively  wide  range  in  grading  which  is 
shown  in  Sec.  208-S,  should  be  permitted  only  when  it  is  economically  impracticable  to 
obtain  materials  meeting  more  restrictive  requirements.  The  most  desirable  grading  will 
depend  upon  the  type  of  work  and  class  of  concrete.  For  the  leaner  mixes,  or  when  a 
small  size  coarse  aggregate  is  used,  in  cases  where  the  degree  of  workabihty  is  important, 
it  is  desirable  to  further  restrict  the  allowable  ranges  in  sizes  shown  in  Sec.  208-S  so  as  to 
insure  a  grading  approaching  the  maximum  percentage  passing  each  sieve.  On  the  other 
hand,  for  the  richer  mixes,  in  the  interest  of  maximum  strength  and  economy,  a  grading 
as  coarse  as  is  consistent  with  the  requirements  for  workabihty  should  be  specified. 
However,  in  no  case  should  a  range  in  grading  be  specified  more  restrictive  than 
indicated  below: 

Passing  No.  16  sieve — range  20  percent  or  less 
Passing  No.  SO  sieve — range  IS  percent  or  less 
Passing  No.   100  sieve — range     S  percent   or  less 

207.  Coarse  Aggregate  Grading 

The  requirements  for  size  of  coarse  aggregate  specified  in  Sec.  21S-S  are  those 
recommended  by  the  Joint  Technical  Committee  of  the  mineral  aggregates  associations. 
They  have  been  adopted  for  use  in  certain  federal  specifications  and  by  the  American 
Association  of  State  Highway  Officials  and  as  Simplified  Practice  Recommendation 
R  163-39  of  the  Division  of  Simplified  Practice  of  the  Department  of  Commerce.  The 
sizes  seem  to  cover  adequately  the  usual  requirements  for  concrete.  The  grading  limita- 
tions also  are  believed  to  be  reasonable  from  the  standpoint  of  both  producer  and  con- 
sumer. The  committee  recommends  that  these  sizes,  with  the  corresponding  grading 
limits,  be  used  wherever  it  is  practicable  to  do  so. 


Materials 41 

208.  Deleterious  Substances 

The  requirements  covering  deleterious  substances  as  given  in  Sec.  210-S  and  216-S 
are,  of  necessity,  quite  general.  Broadly  speaking,  the  term  "deleterious  substances,"  as 
applied  to  aggregates,  includes  any  material  contained  therein  which  will  adversely  affect 
the  quality  of  the  concrete  in  any  way.  This  would  include  a  great  variety  of  materials 
such  as  shale,  unsound  chert,  coal,  ochre,  excessively  flat  or  elongated  fragments,  etc., 
coatings  of  various  kinds  which  would  affect  the  bond,  and  materials  which  would 
adversely  affect  the  hardening  of  the  cement.  Except  for  certain  general  limits  which 
are  recognized  in  most  specifications,  reliance  must  be  placed  upon  the  judgment  of  the 
Engineer  based  on  past  experience  with  the  types  of  material  which  will  be  encountered 
and  with  due  regard  to  the  economic  considerations  involved.  With  these  considerations 
in  mind,  the  Engineer  should  list  in  Sec.  210-S  and  216-S  the  additional  deleteriou.s 
substances  which  in  his  judgment  should  be  controlled,  together  with  appropriate  limits, 
based  wherever  possible  upon  recognized  test  procedures,  reference  to  which  should  be 
made  in  Sec.  229-S. 

209.  Soundness 

When  the  concrete  is  to  be  exposed  to  the  weather  and  other  destructive  agencies, 
care  should  be  exercised  to  select  aggregates  of  durability  adequate  for  the  degree  of 
exposure.  As  indicated  in  Sec.  213-S  and  217-S  of  the  specifications,  principal  reliance 
should  be  placed  on  service  records,  when  adequate  information  in  that  regard  is  avail- 
able. In  the  absence  of  such  information,  the  accelerated  soundness  test  specified  in 
Sec.  213-S  and  217-S  should  be  utilized.  Methods  for  accelerated  soundness  tests  in- 
volving controlled  freezing  and  thawing  in  the  laboratory  and  the  use  of  salts,  principally 
magnesium  sulphate  (MgS04)  and  sodium  sulphate  (Na2S04),  to  simulate  freezing  and 
thawing,  have  been  used.  The  committee  has  suggested  the  accelerated  soundness  test 
using  sodium  sulphate  (Na2S04)  and  has  recommended  requirements  based  on  a  rela- 
tively limited  amount  of  information  resulting  principally  from  experience  in  climates 
where  considerable  freezing  and  thawing  is  encountered. 

210.  Lightweight  Aggregates 

Comparatively  limited  experience  in  the  field  of  lightweight  aggregates  justifies  a 
more  conservative  specification  at  the  present  time  than  may  be  desirable  later,  particu- 
larly in.  those  cases  where  exposure  to  wear  and  weather  are  not  major  factors.  There- 
fore, practically  no  concession  is  made  for  this  type  of  aggregate  in  the  general  aggregate 
requirements  other  than  that  of  lower  compressive  strength  in  the  mortar  strength  test. 
It  is  suggested,  however,  that  coarse  aggregate  weighing  less  than  normal  aggregates  and 
more  than  5S  lb.  per  cu.  ft.  (recommended  as  the  maximum  weight  for  lightweight 
aggregates),  and  meeting  all  requirements  for  lightweight  aggregates  except  weight,  may 
l)e  used  where  lightweight  concrete  is  permissible  when  in  the  opinion  of  the  Engineer 
the  weight  requirement  may  be  waived. 

211.  Aggregates — Fireproofing 

(a)  Coarse  aggregates  for  use  in  fireprui)fing  have  been  divided  into  two  classifica- 
tions in  recognition  of  differences  in  behavior  when  subjected  to  high  temperatures.  In 
general,  Group  1  includes  aggregates  predominating  in  materials  which  change  in  volume 
a  relatively  small  amount  when  exposed  to  high  temperatures,  and  cinders  low  in  com- 
bustible materials;  Group  2  includes  aggregates  containing  substantial  proportions  of 
particles  which  change  in  volume  a  relatively  large  amount  when  exposed  to  high  tem- 
peratures, and  cinders  containing  combustible  material  in  excess  of  the  desirable  minimum. 


42 Report    on    Concrete    and    Reinforced    Concrete 

(b)  The  dividing  line  between  the  two  groups  is,  necessarily,  somewhat  arbitrary, 
but  it  is  believed  that  it  has  been  drawn  as  accurately  as  available  data  permit.  That 
there  is  a  difference  in  the  ability  of  concrete  made  with  different  aggregates  to  resist 
high  temperatures  is  evident  from  information  available;  how  important  these  differences 
are  to  the  protection  of  life  and  property  is  not  so  readily  evaluated.  It  should  be 
emphasized  that  adequate  fireproofing  can  be  obtained  with  the  materials  in  either  group 
so  long  as  the  differences  in  their  characteristics  are  taken  into  account  in  the  design  of 
the  concrete. 

(c)  The  classification  of  the  different  types  of  aggregate  is  consistent  with  that  in 
the  "Recommended  Minimum  Requirements  for  Fire  Resistance  in  Buildings"  outUned 
in  the  Report  of  the  Department  of  Commerce  Building  Code  Committee,  although  the 
limitation  on  percentage  of  siliceous  particles  is  more  rigid.  The  committee  believes  that 
the  recommendations  outlined  in  Sec.  22S-S,  when  considered  in  connection  with  those 
in  Sec.  505,  offer  a  conservative  basis  for  the  selection  of  coarse  aggregates  for  fireproofing. 

212.  Resistance  to  Abrasion 

Typical  requirements  covering  wear  resistance  of  coarse  aggregates  for  use  in  con- 
crete subject  to  surface  abrasion  are  included.  There  are  no  generally  recognized  tests 
for  measuring  the  hardness  or  abrasive  resistance  of  fine  aggregates.  The  committee  rec- 
ognizes that,  under  certain  circumstances,  fine  aggregates  possessing  high  resistance  to 
wear  are  essential  and  recommends  that,  in  such  cases,  the  general  clause  covering  fine 
aggregates  (Sec.  207-S)  be  amplified  by  the  Engineer  to  include  a  description  of  the 
desired  characteristics. 

Metal  Reinforcement 

213.  General 

(a)  The  principal  requirements  in  the  selection  of  metal  reinforcement  are  the 
yield  point,  the  bond  value,  and  the  ductility. 

(b)  The  advantage  of  high  yield  point  steel  has  been  recognized  for  many  years, 
and  is  self-evident  in  view  of  the  fact  that  the  yield  point  of  the  reinforcement  prac- 
tically determines  the  ultimate  strength  of  both  flexual  and  compression  members. 

(c)  In  ordinary  commercial  grades  of  steel,  a  high  yield  point  is  generally  accom- 
panied by  a  decrease  in  ductility.  The  balance,  therefore,  between  a  high  yield  point  and 
satisfactory  ductility  has  developed  the  difference  of  opinion  that  exists  as  to  the  grade 
of  steel  to  be  used.  The  relative  importance  of  these  qualities  depends  on  the  character 
and  service  conditions  of  the  structure.  The  choice  of  the  grade  of  steel,  therefore, 
becomes  a  matter  of  engineering  judgment. 

214.  Bond 

The  tendency  toward  increase  in  unit  stresses  and  the  use  of  high  strength  concrete 
emphasizes  the  need  for  higher  and  more  dependable  bond  resistance  than  that  obtained 
by  the  use  of  plain  bars.  In  the  absence  of  standard  specifications  for  acceptable  types 
of  deformed  bars  it  has  been  the  practice  to  permit  an  increase  of  25  percent  in  bond 
value  of  deformed  over  that  of  plain  bars.  This  increase  in  bond  resistance  to  be  useful 
should  be  developed  at  very  small  values  of  end  slip  in  pull-out  tests. 

215.  Ductility 

The  necessary  ductility  in  metal  reinforcement  is  that  which  permits  fabrication  by 
cold-bending  without  indication  of  fracture  or  reduction  in  tensile  strength.  The  prac- 
tical test  for  ductility  is  the  cold-bend  test  in  the  various  specifications.  Material  that 
complies  fully  with  the  bend  test  is  sufficiently  ductile  for  fabrication  purposes. 


Proportioning.    Mixing,    Curing,  Testing 43 

216.  Recommended  Sizes 

The  following  standard  sizes  listed  in  the  U.  S.  Department  of  Commerce  Simplified 
Practice  Recommendation  R26-30,  are  recommended: 

Area  Weight 

Sizes  sq.  in.  lb.  per  ft. 

M"round .05  .167 

^"round .11  .376 

H'round .20  .668 

V^"  square .25  .850 

^"round .31  1.043 

34"round .44  1.502 

'7^"round .60  2.044 

1"      round .79  2.670 

1"      square 1.00  3.400 

lH"square 1.27  4.303 

li4"square 1.56  5.313 


Chapter  III — Proportioning,  Mixing,  Curing,  and 
Testing  Concrete 

301.  General 

The  recommendations  of  this  committee,  covering  proportioning,  mixing,  curing,  and 
testing  concrete,  are  embodied  in  the  succeeding  paragraphs  and  in  the  accompanying 
specifications. 

302.  Basis  for  Specification 

(a)  There  are  two  distinct  views  with  respect  to  the  function  of  the  Contractor 
which  cannot  be  reconciled  in  a  single  specification.  Under  one  of  these  it  is  assumed 
that  the  function  of  the  Contractor  is  to  contribute  his  skill  as  a  concrete  technician  as 
well  as  his  ability  in  handling  construction  equipment  and  materials.  Under  the  other  it 
is  assumed  that  the  Contractor's  function  is  purely  that  of  a  builder  and  that  the  Engi- 
neer, who  prepares  the  plans  and  specifications,  is  the  concrete  technician.  Obviously, 
the  manner  of  specifying  the  quality  of  the  concrete  and  how  it  shall  be  controlled  will 
not  be  the  same  under  these  two  assumptions.  The  committee,  therefore,  presents 
alternate  specifications  covering  the  sections  on  proportioning  and  concrete  quality. 

(b)  Under  Alternate  A  the  Engineer  establishes  the  general  limitations  of  strength 
and  water  content  within  which  the  Contractor  is  permitted  considerable  latitude  in  the 
choice  of  materials  and  the  methods  of  handling  them.  The  Contractor  is  required  to 
produce  a  plastic  and  workable  concrete  of  the  required  strength  and  water  content  that 
can  be  placed  without  segregation  or  honeycomb.  Under  this  alternate  the  Contractor 
assumes  the  responsibility  for  the  quality.  If  the  concrete  is  lacking  with  respect  to  any 
of  the  above  qualities,  he  must  make  good  the  deficiency  at  his  own  expense. 

(c)  Under  Alternate  B  the  Engineer  designates  in  detail  the  quantities  of  material 
to  be  used,  the  length  of  mi.xing  time,  amount  of  water,  range  in  slump,  etc.,  and  to  this 
extent  is  responsible  for  the  quality  of  the  concrete.  Changes  in  quantities  or  types  of 
materials  can  be  made  only  on  the  order  of  the  Engineer  and  then  adjustment  of  com- 
pensation will  be  required  under  the  clauses  covering  extra  compensation  or  credit  in 
the  contract.  The  Engineer,  on  behalf  of  the  owner,  is  responsible  for  the  adequacy  of 
the  specification. 

(d)  In  using  the  accompanying  specification,  the  Engineer  must  designate  which  of 
the  alternates  is  to  be  used,  and  fill  in  the  necessary  tables  with  the  specific  information 


44  Re  port    on    Concrete    and    Reinforced    Concrete 

required  for  the  project.  The  recommendations  of  the  committee  bearing  on  the  points 
involved  will  be  found  in  the  succeeding  paragraphs. 

303.  Requirements  of  Concrete  for  Various  Conditions  of  Exposure 

(a)  Since  the  publication  of  the  1924  report  there  has  been  considerable  develop- 
ment in  the  technology  of  concrete  in  which  special  emphasis  has  been  placed  on  prop- 
erties other  than  compressive  strength,  particularly  durability  and  watertightness.  These 
properties,  it  has  been  shown,  are  controlled  principally  by  the  same  factors  which  con- 
trol compressive  strength;  namely  (for  aggregates  and  cement  of  given  quality)  by  the 
relative  proportions  of  cement  and  water  and  the  extent  to  which  adequate  curing  is 
provided.  Studies  have  also  shown  that  for  durability,  concrete  when  finally  in  place 
must  be  free  from  any  honeycomb  or  other  defects  which  permit  the  entrance  of  water. 
The  recommendations  of  this  committee,  therefore,  are  built  around  the  control  of  the 
water  content  and  curing  and  those  factors  which  influence  workability  of  the  concrete 
and  the  methods  of  placing  and  compacting. 

(b)  In  Table  1  are  given  recommended  water  contents  which  are  suitable  for  con- 
crete intended  for  various  conditions  of  exposure.  These  are  based  on  the  assumption 
that  the  concrete  will  be  plastic  and  workable,  and  placed  and  compacted  in  such  man- 
ner that  a  dense,  homogeneous  mass  will  be  obtained.  They  also  presume  that  the  con- 
crete will  be  sufficiently  protected  from  loss  of  moisture  and  from  low  temperatures  to 
insure  that  proper  hardening  will  develop. 

304.  Specified  Strengths  and  Water  Contents — Alternate  A 

(a)  Alternate  A  is  based  on  a  dual  control  in  which  both  a  minimum  strength  and 
a  maximum  allowable  water  content  are  specified.  It  puts  on  the  Contractor  full  re- 
sponsibility for  the  strength,  consistency,  and  water-cement  ratio.  The  strengths  to  be 
inserted  in  Table  A,  Sec.  301-SA  of  the  specifications,  are  intended  to  be  those  meeting 
the  requirements  of  the  design  calculations.  As  required  in  the  specifications  (Sec.  302-SA) 
the  Contractor  must  submit  mixtures  which  he  proposes  to  use  for  the  different  classes 
of  work  together  with  a  laboratory  report  showing  that  these  mixtures  will  produce  the 
strengths  specified  and  do  not  exceed  the  maximum  allowable  water  contents.  The 
method  of  making  the  tests  and  the  range  of  mixtures  are  covered  by  the  specification. 

(b)  The  maximum  allowable  water  contents  to  be  inserted  in  Table  A,  are  those 
meeting  the  exposure  requirements  which  in  the  judgment  of  the  Engineer  will  be  re- 
quired for  the  several  portions  of  the  work.  The  values  to  be  inserted  in  Table  A  can 
be  obtained  from  Table  1.  It  may  frequently  happen  that  the  water  content  which  will 
meet  the  particular  exposure  requirements  will  correspond  to  a  strength  of  concrete  in 
excess  of  that  upon  which  the  design  calculations  were  based.  Likewise,  it  may  be 
found  that  to  meet  the  strength  requirements  will  require  a  water  content  even  lower 
than  that  needed  for  the  exposure. 

(c)  To  avoid  a  multiplicity  of  concrete  mixes  on  a  given  project,  a  series  of  mixes, 
such  as  shown  in  Table  2,  is  recommended.  The  eight  mixes  shown  provide  for  the 
entire  range  of  exposures  covered  in  Table  1.  The  strengths  shown  for  the  different 
water  contents  represent  those  now  commonly  obtained  with  normal  Portland  cement. 
For  important  work  it  is  recommended  that  a  similar  table  be  drawn  up  based  on  tests 
of  the  materials  available  for  the  project.  Such  tests  should  be  carried  out  as  specified 
in  Sec.  321-S  to  32S-S. 

305.  Specified  Mixtures — Alternate  B 

(a)  Alternate  B  is  a  specification  based  primarily  on  a  designated  cement  content, 
Inil  in  which  there  is  also  specified  a  maximum  water  content,  a  maximum  size  of  aggrc- 


Water    Contents 


45 


O 


u 


u 


I 

St? 

>»  o 

q  o 

DC    C 
■Si"  '^' 


G^ 


CC 


a. 


DC 


?  c 


fc  ^  o  a 


< 


^ 


O 


:^^ 


Zee  S 


•S  o 


^ 


•Q. 


»0  CD 

t^ 

lO 

;0  t-~ 

o. 


CC 


CC 


•  01 


o  c«  if 

3    M    g 

^■^^^ 

t:  8o  s 

oi       ft  S 


'^  2 

r4     CO 


C3   fl 


0)  :3.+^  ;zl 

rt  S  c  <" 


(H  -u 

s 

c 

o 

[A 

a" 

=3  4^ 


5  to 
o 


^   0) 

I" 


^ft 
T3    O 

3  bfi 

O    O) 
to    O 

5    *H 


CO 


cn.«     O   C 


T3  C    3 

a  o  c 


O   to 


..    W    d; 

bfi  "^  »-' 

"  >»  >»  .s  ^ 
o5  o 


>»i=l 


■73    b 


ft  iS- 


g  iH  c 


o    a 


'3 

.2" 

> 


o 


M  ;3 

P  0) 

o  ►-. 

+^  »-. 

c  o 

cu  ^ 

(D  T3 

'-'  C 

CO  O) 


O   ° 

ft.23 
_.  to 

g-^ 

«    O) 

CO    rj 

.S  C 
'O  o 

3  o) 

■£!  -"^ 

TZ  « 
o^ 

o   =" 

CD  "^ 

<P  o 

-l-J    CO 


CO  +-> 

3  O 
CO  S 


C 
3 
O 
»-i  -  f^ 

rS      •   CD   O) 

M  O)  I*  13 


be 


tn    oj    i^.5"co 


C  c5  a* 
S  S  »J 


01  i^*"   w 


O)        ^ 

o  «  0)2: 

4J  re  CO  o 
^  t-  ft  c 

X  re  o^ 

t;  S  t  <u 
•  •  c  S  c  t: 

"2   O   !xl   O   3 

re  (-1  -t->  fc  Q, 

o  o  o  o  rr 

'S3   5 
ft 


O 


46  Report    on    Concrete    and    Reinforced    Concrete 

gate,  a  range  in  slump,  and  a  range  in  percentage  of  fine  aggregate.  The  other  items  to 
be  filled  in  Table  B  (Sec.  301-SB)  are  purely  informative  and  not  to  be  confused  with 
specified  values.  It  is  strongly  recommended  that  the  Engineer,  whenever  practicable, 
make  prehminary  tests  of  available  materials  in  order  to  determine  the  values  to  be 
inserted  in  Table  B. 

(b)  Where  it  is  impracticable  to  make  preliminary  tests,  and  a  specification  along 
the  lines  of  Alternate  B  is  to  be  adopted,  the  mixes  in  Table  3  are  suggested.  The  values 
in  Table  3  are  for  a  concrete  of  a  medium  cons'stency  (4-in.  slump) .  The  quantities  of 
cement  indicated  will  need  to  be  changed  if  other  consistencies  are  to  be  entered  in 
Table  B.  Since  the  quantities  in  Table  3  are  all  approximate,  it  will  be  sufficiently  accu- 
rate to  modify  the  cement  content  in  accordance  with  the  following:  For  each  1-in. 
difference  in  slump,  change  the  cement  factor  ^s  sack  per  cu.  yd.,  increasing  this  factor 
for  slumps  greater  than  4  in.  and  reducing  it  for  slumps  less  than  4  in. 

(c)  When   tests   are   being   made   to   determine   the   quantities   and   proportions   of 
materials  to  use  in  Table  B,  the  weights  specified  in  columns  8  and  9  should  be  based 
on  the  known  specific  gravities  of  the  aggregates  to  be  used.  When  these  data  are  sup- 
Table  2 


Class  of  Concrete 


Maximum  Allowable 

}  Probable  Minimum 

Net  Water  Content 

Allowable  Compressive 

Gal.  Per  Sack  of 

Strength  at  28  Days 

Cement 

p.  s.  i. 

5 

5000 

5M 

4500    . 

6 

4000 

63^ 

3600 

7 

3200 

7H 

2800 

8 

2500 

8M 

2000 

plied  from  Table  3,  it  should  be  recognized  that  the  approximate  quantities  given  in 
columns  6,  7,  and  8  are  based  on  bulk  specific  gravity  of  2.65  in  a  saturated  and  surface- 
dry  condition.  For  aggregates  of  different  specific  gravities  the  approximate  weights 
should  be  multiplied  by  the  ratio  of  actual  specific  gravity  to  the  assumed  value  of  2.65. 

(d)  It  should  be  pointed  out  further  that  in  the  use  of  Alternate  B  the  various 
classes  of  concrete  are  determined  either  by  tests  or  by  selection  from  data  such  as  are 
given  in  Table  3.  Where  the  tests  are  to  be  made  the  Engineer  will  arrive  at  his  own 
values  of  strengths  for  various  water  contents  and  should  select  his  concrete  classes 
accordingly.  Where  Table  B  in  the  specification  is  to  be  filled  out  from  Table  3,  it  must 
be  understood  that -the  strengths  indicated  are  based  on  normal  Portland  cement  and 
aggregates  meeting  the  requirements  of  these  specifications  determined  in  a  manner 
specified  in  Sec.  321-S  to  32S-S.  If  other  than  normal  Portland  cement  is  to  be  used, 
these  values  will  not  apply. 

(e)  Particular  attention  is  called  to  the  differences  between  Table  3  and  Table  2. 
The  latter  is  intended  for  use  where  the  Contractor  has  assumed  full  responsibility  for 
the  quaUty  of  the  concrete  and  where  regular  tests  will  be  made  to  assure  that  the 
intended  strengths  are  secured.  Table  3,  on  the  other  hand,  is  compiled  merely  as  sug- 
gested values  to  be  used  when  actual  data  for  the  materials  at  hand  are  lacking.  Because 
of  this,  the  strength  values  indicated  for  the  different  water  contents  are  purposely  made 
conservative. 


P  r  0  p  0  r 

tions 

47 

Table  3 

Cement 

Factor, 

Approx 

.    Wts.   Saturated 

Max. 

Estimated 

Sacks 

Max. 

Fine  Agg. 

Surface-Dry  Agg 

per 

Size 

28-Day 

Cement 

Water 

%  Total 

Sack 

of  Cement- 

-lb. 

Coarse 

Comb. 

per  cu.  yd. 

per  Sack 

Agg. 

(See 

Note   B   be 

ow) 

Agg- 

Str. 

Freshly 

Cement 

(See  Note  A 

in. 

p.  s.  i. 

Mixed 

gal.. 

Below) 

Fine 

Coarse 

Concrete 

Total 

Agg- 

Agg. 

(1) 

(2) 

(3) 

(4) 

(5) 

(6) 

(7) 

(8) 

1 

2250 

4.9 

8 

40^6 

660 

280 

380 

2 

2250 

4.5 

8 

37-43 

740 

300 

440 

3 

2250 

4.1 

8 

34-40 

840 

310 

530 

1 

2750 

5.6 

7 

39-45 

570 

240 

330 

2 

2750 

5.1 

7 

36-42 

640 

250 

390 

3 

2750 

4.7 

7 

33-39 

720 

260 

460 

1 

3000 

6.0 

63^ 

38-44 

520 

210 

310 

2 

3000 

5.5 

GVo 

36-42 

590 

230 

360 

3 

3000 

5.1 

6H 

34-40 

660 

240 

420 

1 

3300 

6.5 

6 

37-43 

470 

190 

280 

2 

3300 

6.0 

6 

35-41 

530 

200 

330 

3 

3300 

5.5 

6 

33-39 

600 

220 

380 

1 

3700 

7.2 

5K 

36-42 

420 

160 

260 

2 

3700 

6.7 

5^ 

34-40 

470 

170 

300 

3 

3700 

6.2 

53^ 

32-38 

530 

180 

350 

1 

4250 

8.0 

5 

35-41 

370 

140 

230 

2 

4250 

7.4 

5 

33-39 

420 

150 

270 

3 

4250 

6.8 

5 

31-37 

470 

160 

310 

Note  A — The  limits  shown  in  Col.  (S)  are  approximate  and  percentages  falling  outside  of  the  limits 
shown  may  frequently  be  found  necessary  to  produce  concrete  of  the  desired  workability.  Wheii  ex- 
pressed in  terms  of  absolute  volume  they  are  applicable  to  aggregates  of  different  specific  gravities; 
when  expressed  in  terms  of  weight,  differences  in  specific  gravity  should  be  taken  into  account. 

Note  B — The  approximate  weights  in  columns  (6),  (7),  and  (8)  are  based  on  a  bulk  specific 
gravity  of   2.65    in   a  saturated  surface-dry   condition. 

306.  Use  of  High  Early  Strength  Portland  Cement 

Both  Alternates  A  and  B  carry  provisions  for  the  use  of  high  early  strength  cement 
(309-SA  and  306-SB).  These  are  based  on  the  assumption  that  the  3-day  and  7-day 
strengths  for  the  high  early  strength  cement  concrete  are  equivalent,  respectively,  to  the 
7  and  28-day  strengths  for  the  normal  Portland  cement  concrete.  When  the  materials 
to  be  used  show  other  relationships,  these  of  course  should  be  specified. 

307.  Consistency  and  Size  of  Aggregate 

(a)  The  consistency  of  the  concrete  and  the  maximum  size  of  aggregate  to  be  used 
will  be  dependent  upon  the  conditions  prevailing  at  each  individual  job.  The  factors 
which  will  govern  are:  The  available  materials,  size  of  the  member,  quality  of  concrete 
to  be  produced,  arrangement  of  reinforcement,  and  the  manner  of  transporting  and 
placing  the  concrete.  Decision  in  respect  to  these  items  should  be  made  with  the  re- 
quirements of  plasticity  and  workabiHty  clearly  in  mind.  In  structures,  where  the 
exposure  will  be  severe,  it  is  of  utmost  importance  that  the  plasticity  and  workability 
of  the  concrete  be  such  that  it  can  be  placed  and  compacted  without  honeycomb  or 
other  defects  which  will  permit  the  entrance  of  water. 

(b)  Table  4  gives  suggested  aggregate  sizes  and  consistencies  suitable  for  several 
different  classes  of  work.  See  Sec.  504-506  and  854  for  recommendations  regarding 
embedment  and  spacing  of  reinforcement. 


Consistency 
Maximum 

-Slump 
Minimum 

Maximum  Size  of 
Coarse  Aggregate 
in. 

in. 

in. 

5 

2 

VA 

4 
6 
6 
3 
3 

1 
3 
3 
2 

1 

2 

1 
1 
2 

3  to  6* 

48  Report    on    Concrete   and    Reinforced    Concrete 

Table  4 


Portion  of  Structure 

Reinforced  foundation  walls  and 
footings 

Plain  footings,  caissons  and  sub- 
structure walls 

Slabs,  beams,  and  reinforced  walls. 

Building  columns 

Pavements 

Heavy  mass  construction 

*  In  making  the  slump  test,  all  aggregate  larger  than  2  inches  should  be  screened  out  of  the  mixture. 

(c)  When  high  frequency  mechanical  vibration  is  used  for  compacting  concrete,  the 
limiting  consistencies  in  Table  4  will  need  to  be  modified.  When  properly  applied, 
mechanical  vibration  permits  the  use  of  stiffer  consistencies  than  are  possible  under 
hand  placing.  For  a  given  water  content,  therefore,  leaner  mixtures,  that  is,  lower  cement 
factors,  can  be  utilized  when  this  method  of  placing  is  employed.  Generally,  the  ratio 
of  fine  to  coarse  aggregate  should  be  reduced  where  high  frequency  mechanical  vibration 
is  employed.  See  Sec.  404  for  Recommended  Practice  on  Placing  Concrete  by  Vibration. 

308.  Ready-Mixed  Concrete 

(a)  Sec.  313-S  and  31S-S  require  that  the  maximum  size  of  batch  which  may  be 
placed  in  a  truck  mixer  or  agitator  shall  be  in  accordance  with  the  "specified  rating." 
In  general,  the  manufacturer's  rating  should  be  used,  since  it  takes  into  account  the 
strength  and  balance  of  the  entire  mechanism  as  well  as  its  efficiency  as  a  mixer  or 
agitator.  However,  experience  with  equipment  now  in  general  use  shows  that  the  rated 
capacities  should  not  exceed  the  following  percentages  of  the  gross  volume  of  the  drum: 

1.  Truck  mixers  performing  the  entire  mixing  operation  (see  Sec.  313-S) 

(a)  Top-door  loading    SO  percent 

(b)  End-door  loading   57%  percent 

2.  Truck  mixers  completing  the  mixing  of  concrete  partially  mixed  at  central 

plant  (see  Sec.  314-S)    66%  percent 

3.  Agitators   or   truck    mixers    used   for   transporting   mixed    concrete    (see 

Sec.  31S-S)    80  percent 

Frequently,  the  manufacturer's  ratings  are  less  than  the  limits  given  above  because 
of  factors  other  than  mixing  efficiency. 

(b)  In  Sec.  31S-S,  a  period  of  1%  hours  within  which  delivery  of  ready-mixed  con- 
crete must  normally  be  made  is  specified.  This  is  based  on  the  results  of  research  which 
have  shown  that  a  period  of  1^  hours  between  the  beginning  of  mixing  and  the  com- 
pletion of  the  discharge  of  the  batch  results  in  no  detrimental  effects  on  the  concrete. 
The  data  indicate  that  under  specially  favorable  conditions  periods  up  to  2  and  3  hours 
may  be  allowed.  Experience  has  shown  that  with  certain  soft  aggregate  greatly  pro- 
longed mixing  will  result  in  a  decrease  in  size  of  aggregate  particles  and  a  corresponding 
increase  in  the  proportion  of  fine  material.  When  air  temperatures  are  unusually  high,  or 
the  ingredients  of  the  concrete  mixture  are  such  that  an  unusually  quick  time  of  set  or 
loss  of  plasticity  may  occur,  it  may  be  necessary  to  specify  periods  shorter  than  1^ 
hours  to  insure  that  no  damage  be  done  to  the  concrete.  The  exact  period  will  depend 


Curing ^9 

upon  the  materials  being  used  and  the  prevailing  temperatures.  It  is  unlikely,  except 
under  the  most  unusual  circumstances,  that  it  will  be  necessary  to  specify  a  period  of 
less  than  1  hour. 

309.  Curing 

(a)  The  protection  of  concrete  against  low  temperatures  and  loss  of  moisture  dur- 
ing the  period  immediately  after  placing  is  an  important  factor  in  the  development  of 
both  strength  and  durability  in  concrete.  Sec.  318-S  in  the  specifications  requires  that 
the  concrete  be  protected  to  prevent  loss  of  moisture  from  the  surface  and  to  prevent 
temperatures  at  the  surface  from  going  below  SO  deg.  F.  for  periods  of  7  days  where 
normal  Portland  cement  is  used,  and  3  days  where  high  early  strength  Portland  cement 
is  used.  In  fixing  these  limits  it  is  recognized  that  under  average  conditions,  curing  of 
concrete  does  not  cease  immediately  upon  removal  of  the  protection  against  loss  of 
moisture.  Where  the  conditions  are  severe,  as,  for  example,  thin  sections  in  hot  dry  air 
or  low  temperatures,  it  may  be  desirable  to  increase  somewhat  the  protection  periods 
specified. 

(b)  The  committee  recognizes  that  under  the  specification  requirement  in  Sec.  318-S 
some  doubt  may  arise  as  to  the  methods  which  will  be  acceptable.  It  is  not  prepared, 
however,  to  offer  more  specific  recommendations,  but  it  does  suggest  the  following 
methods  which  have  been  used  to  achieve  the  desired  end  with  varying  degrees  of 
success:* 

(1)  Surface  remaining  in  contact  with  the  forms. 

(2)  The  surfaces  of  slabs  protected  by  ponding. 

(3)  Covering  with  burlap  or  cotton  mats  kept  continuously  wet. 

(4)  Covering  with  paper  of  suitable  type. 

(5)  Covering  with  one-inch  layer  of  thoroughly  wet  sand,  earth,  or  sawdust. 

(6)  Covering  with  six-inch    layer    (loose)    of    thoroughly    wet   straw,   hay,    or 
similar  material. 

(7)  Continuous  sprinkling  of  the  exposed  surfaces. 

310.  Field  Tests 

(a)  The  sections  in  the  specifications  referring  to  field  tests  (320-S  to  32S-S)  are 
intended  primarily  for  use  with  Alternate  A  under  which  the  Contractor  assumes  respon- 
sibility for  the  strength  of  concrete  being  produced.  While  the  tests  are  to  be  made  at 
the  expense  of  the  owner  and  entirely  under  the  supervision  of  the  Engineer,  the  clauses 
are  included  in  the  specification  so  that  there  will  be  a  definite  understanding  as  to  the 
methods  by  which  the  quality  of  the  concrete  being  produced  is  to  be  judged. 

(b)  Where  a  specification  along  the  lines  of  Alternate  B  is  used  such  explicit  direc- 
tions for  making  the  tests  are  not  necessary.  However,  there  seems  to  be  no  good  reason 
for  omitting  these  detailed  clauses  in  such  case. 

311.  Field-Cured  Specimens 

(a)  The  question  may  arise  as  to  why  the  specifications  for  Field  Tests  of  Con- 
crete  (Sec.  32Q-S  to  32S-S)   call  for  the  curing  of  specimens  in  the  laboratory,  rather 
•  than  in  the  field.  The  committee  takes  the  position  that  under  the  conditions  prevailing 
in  most  structures  it  is  practically  impossible  to  store  specimens  in  the  field  in  such  a 
manner  that  their  strength  can  be  assumed  to  represent  accurately  the  strength  of  the 


•  The  committee  also  calls  attention  to  the  specifications  for  curing  Portland  cement  concrete  adopted 
liy  the  AREA  in  March,  1936,  which  carry  very  definite  requirements  for  protection  aeainst  low 
temperatures  and  loss  of  moisture.  These  specifications  are  reproduced  in  Appendix  4. 


50 Report    on    Concrete    and    Reinforced    Concrete 

concrete  in  the  structure.  An  exception  is  noted  in  the  case  of  pavement  slabs  in  which 
a  procedure,  described  in  (d)  below,  is  used  that  gives  reliable  indications  as  to  the 
strength  of  the  concrete. 

(b)  Under  such  a  specification  as  Alternate  A,  the  quality  of  concrete  being  placed 
in  the  usual  type  of  structure  can  only  be  judged  on  the  basis  of  specimens  stored  in 
accordance  with  standard  laboratory  procedure. 

(c)  Field-cured  specimens  may  give  information  of  value  as  to  the  curing  condi- 
tions prevailing  on  the  job,  but  the  results  must  be  interpreted  with  caution,  and  under 
no  circumstances  should  they  be  used  to  determine  compliance  with  the  requirements 
of  a  strength  specification  of  the  type  covered  by  Alternate  A. 

(d)  As  noted  above,  it  is  quite  common  practice  in  the  construction  of  concrete 
pavements  to  use  the  results  of  tests  of  field-cured  beam  specimens  to  determine  the  age 
at  which  it  will  be  safe  to  open  the  road  to  traffic.  The  usual  practice  is  as  follows: 
After  removal  from  the  molds  at  the  end  of  24  hours  the  specimens  are  bedded  on  the 
subgrade  alongside  the  pavement  and  the  sides  banked  with  earth,  leaving  only  the  sur- 
faces exposed.  Every  care  is  taken  to  give  the  surfaces  of  these  beams  exactly  the  same 
curing  treatment  as  the  pavement.  A  sufficient  number  of  specimens  is  made  each  day  to 
permit  testing  at  various  ages  until  the  results  show  that  the  concrete  has  attained  the 
required  flexural  strength.  The  tests  are  ordinarily  made  on  the  job,  using  one  of  the 
several  types  of  portable  beam  testing  machines  on  the  market. 

312.  Enforcement  of  Strength  Requirements 

Any  contract  in  which  concrete  of  a  definite  strength  is  specified  should  contain 
some  provision  outlining  the  procedure  to  be  followed  in  case  it  is  discovered  after 
portions  of  the  structure  are  completed  that  the  concrete  fails  to  comply  with  the 
requirements.  The  objection  to  a  strength  specification  has  largely  been  based  on  the 
absence  of  such  provisions.  Sec.  326-SA  to  328-SA  in  the  specifications  are  intended  to 
cover  this  contingency.  These  sections  should  be  stricken  out  if  Alternate  B  Specification 
is  adopted. 


Chapter  IV — Forms  and  Placing 

401.  General 

Except  for  the  following  special  cases  the  recommendations  of  the  committee  are 
embodied  in  the  specifications. 

402.  Pneumatic  Placing  of  Concrete 

(a)  In  order  to  obtain  the  best  results  with  equipment  now  available  the  following 
general  rules  should  be  observed: 

(1)  The  placing  equipment  should  be  located  as  close  to  the  point  of  deposit  as 
practicable,  and  the  concrete  should  be  conveyed  from  the  mixer  with  as  Uttle  segregation 
as  conditions  will  permit. 

(2)  The  volume  of  concrete  at  each  discharge  of  the  gun,  in  general,  should  not 
exceed  7  cu.  ft.  Distances  from  gun  to  nozzle  greater  than  1,000  ft.  should  be  avoided. 
The  general  slope  of  the  discharge  line  may  vary  from  a  horizontal  to  a  vertical  direc- 
tion, but  in  no  case  should  it  be  inclined  downward. 

(3)  The  position  of  the  nozzle  should  be  such  that  the  concrete  is  directed  to  the 
point  of  deposit  without  impinging  directly  on  the  reinforcement,  and  without  excessive 
rebound  of  material. 


i 

I 


Pumping    Concrete Si 


(4)  Concrete  of  a  medium  consistency  gives  the  best  results.  Sloppy  mixes  are 
unsatisfactory. 

(b)  When  this  method  is  being  used  cores  should  be  drilled  at  appropriate  intervak 
for  tests  to  determine  whether  the  concrete  being  placed  is  of  the  desired  quality. 

403.  Pumping  Concrete 

(a)  The  pumping  equipment,  the  charging  hopper,  and  the  devices  used  at  the  out- 
let of  the  pipe  should  be  such  that  concrete  of  the  specified  quality  and  consistency  can 
be  transported  and  delivered  in  the  forms  without  segregation.  The  devices  used  at  the 
outlet  of  the  pipe — deflectors,  spouts,  hose  connections,  swivel-mounted  elbows,  elephant 
trunks,  etc., — should  be  selected  to  meet  the  particular  requirements  of  the  job. 

(b)  The  pump  should  be  able  to  produce  a  working  pressure  of  at  least  300  lb.  per 
sq.  in.,  and  the  pipe  line  and  fittings  should  be  designed  to  resist  approximately  double 
this  pressure. 

(c)  The  pipe  line  should  be  laid  with  as  few  bends  as  possible,  and  changes  in 
direction  should  be  accomplished  preferably  with  bends  45  deg.  or  less.  Ninety-degree 
bends  should  be  used  only  where  they  are  unavoidable. 

(d)  Where  it  is  necessary  to  lay  the  pipe  with  a  downhill  grade,  a  choke  should  be 
used  at  the  discharge  end  to  keep  a  continuous  flow  of  concrete  in  the  line.  For  vertical 
pumping,  a  shut-off  valve  should  be  placed  in  the  lower  line  to  prevent  backflow  when 
pumping  is  stopped,  or  when  making  pipe  changes  or  cleaning  at  the  end  of  a  run. 

(e)  Concrete  having  a  slump  of  two  inches  or  more  can  be  handled  easily  by  pump- 
ing— irrespective  of  the  character  and  type  of  coarse  aggregate,  that  is,  whether  round  or 
angular.  For  workable  mixes  of  less  than  two-inch  slump,  gravel  concrete  pumps  more 
easily  than  crushed  stone  concrete.  With  concrete  having  4.5  sacks  or  less  cement  per 
cubic  yard  the  quality  and  grading  of  sand  is  important  for  successful  pumping.  For 
such  concrete,  sand  with  a  relatively  high  percent  of  fines  that  will  hold  water  and 
prevent  "bleeding"  is  desirable. 

(f)  A  shut-down  of  half  an  hour  usually  will  not  prevent  the  starting  of  the  pump 
and  the  delivery  of  the  concrete  in  good  condition.  The  permissible  limit  of  a  shut-down 
with  a  full  charge  of  concrete  in  the  line  will  depend  on  temperature  conditions  and  the 
rate  of  stiffening  or  hardening  of  the  concrete. 

(g)  Immediately  before  concreting  is  begun  the  empty  pipe  line  should  be  flushed 
with  water  and  a  charge  of  thin  grout  placed  ahead  of  the  concrete  to  properly  lubri- 
cate the  line.  About  one  cubic  foot  of  grout  should  be  used  for  each  1,000  sq.  ft.  of 
inside  surface  area  of  pipe  line  and  a  plug  or  "go-devil"  should  be  used  just  ahead  of 
the  grout  to  force  out  any  free  water. 

(h)  At  the  end  of  a  run  a  "go-devil"  should  be  forced  through  the  pipe  line  to 
clean  out  the  concrete. 

(i)  Job  experience  with  pumping  equipment  suggests  the  use  of  the  following  sizes 
of  pipe,  maximum  sizes  of  coarse  aggregate,  and  slump  of  concrete  for  maximum 
pumping  distances. 

Maximum  Pumping  Maximum  Size 

Pipe  Size           Slump  of  Distance — fl.                                Material 

in.  Concrete  (Passing  Screen 

in.  Horizontal*               Vertical      **            Size — in.) 

8           Not  less  than  1  1000                          100                            3 

7           Not  less  than  1  800                          100                            2}^ 

6           Not  less;than  3  600                          100                            2 

•  A  90-deg.  elbow  is  estimated  to  be  equivalent  to  40  ft.  of  horizontal  piping. 
••  Not  over  200  ft.  of  pipe,  actual. 


52  R  e  p  0  r  t    o  n    Concrete    and    Reinforced    Concrete 

404.  Placing  by  Vibration 

(a)  The  use  of  vibration  for  compacting  and  placing  concrete  is  comparatively  new, 
and  differences  of  opinion  exist  as  to  the  best  methods,  particularly  as  to  frequency,* 
methods  and  position  of  application,  amplitude,*  length  of  time  of  vibration,  force  of 
blow  (related  to  the  size  of  vibrator),  and  the  area  or  volume  of  concrete  over  and 
through  which  vibration  is  effective.  It  is  desirable,  therefore,  that  the  supervising  per- 
sonnel, as  well  as  the  operators  of  the  vibrating  equipment,  be  experienced. 

(b)  Vibration  imparts  no  new  properties  to  concrete.  However,  its  use  permits 
economies  or  improvement  in  the  quality  of  the  concrete  through  the  use  of  stiffer  and 
harsher  mixtures  with  lower  water  content  than  is  possible  with  the  usual  methods  of 
placement.  The  consistency  of  the  concrete  should  be  adjudged  to  the  particular  condi- 
tions of  placement  and  equipment  in  use.  The  concrete  should  not  be  so  dry  as  to  make 
placement  difficult,  nor  so  wet  as  to  produce  a  fluid  condition  on  the  surface  of  the 
concrete.  In  general,  vibration  should  not  be  used  when  the  slump  of  concrete  exceeds 
three  inches  except  as  an  aid  in  placing  under  difficult  conditions. 

(c)  All  jobs  on  which  the  use  of  vibration  is  new  should  start  with  a  mixture  which 
can  be  placed  readily  by  the  usual  methods.  The  quantity  of  cement,  water,  and  propor- 
tion of  fine  to  coarse  aggregate  should  then  be  adjusted  gradually  until  the  mixture  has 
the  desired  placeability.  This  will  generally  require  a  readjustment  in  the  ratio  of  fine 
to  coarse  aggregate,  usually  an  increase  in  the  percentage  of  coarse  aggregate.  Where 
economy  is  desired  the  total  volume  of  the  aggregates  should  be  increased.  Where 
improved  quality  is  desired,  the  water-cement  ratio  should  be  reduced. 

(d)  Where  excessive  bleeding  occurs  which  cannot  be  readily  corrected  by  adjusting 
the  mixture,  the  percentage  of  sand  finer  than  the  No.  50  sieve  should  be  increased. 

(e)  Vibration  should  not  be  applied  directly  or  through  the  reinforcement  to  sec- 
tions or  layers  of  concrete  which  have  hardened  to  the  degree  that  the  concrete  ceases 
to  become  plastic  under  vibration.  Vibration  should  not  be  continued  at  any  one  point 
to  the  extent  that  localized  areas  of  grout  are  formed. 

(f)  One  of  the  evidences  of  sufficient  vibration  is  the  appearance  of  a  line  of  cement 
paste  at  the  junction  of  the  concrete  and  the  forms,  or  the  concrete  and  surface  of  the 
steel  reinforcement.  When  the  decrease  in  volume  of  the  concrete  is  no  longer  apparent 
the  vibration  has  been  sufficient. 

(g)  Vibration  should  not  be  used  to  make  concrete  flow  in  the  forms  over  distances 
so  great  as  to  cause  segregation. 

(h)  Vibration  is  appHed  to  the  concrete  in  various  ways,  depending  upon  the  type 
and  size  of  member  being  cast  and  whether  applied  in  the  field  or  in  the  shop.  It  is 
appUed  to  the  forms  generally  for  sections  of  walls,  columns,  floor  slabs,  and  precast 
units  too  small  for  operating  vibrators  of  the  internal  type.  Both  internal  vibrators  and 
platform  vibrators  are  used  for  compacting  concrete  in  massive  structures.  A  table 
vibrator  is  used  for  making  cast  stone  or  concrete  products.  For  pavement  work  a 
vibrating  screed  is  used. 

(i)  Vibration  increases  pressure  on  the  forms  which  should  therefore  be  designed  for 
the  higher  pressures  and  greater  strains  on  ties  and  supports.  Proper  precautions  should 
be  taken  to  prevent  leakage  of  mortar  through  joints  in  the  form  work  during  vibration. 

*  Frequency— The  number  of  complete  oscillations  per  minute. 

Amplitude — T"-- ' "    '  -  .     '^       - 

of  an  oscillation. 

Oscillation— A  complete  cycle  of  movement  of  a  vibrating  body. 


Vibrating    Concrete  S3 


405.  Number  and  Size  of  Vibrators  Required 

(a)  The  factors  which  govern  the  selection  of  type,  number,  and  size  of  vibrators 
are  the  following: 

Depth  and  area  of  section. 
Size  of  batch. 

Number  of  batches  per  hour. 
Size  of  aggregate. 

Amount  and  spacing  of  reinforcement. 

Proportions,  particularly   the   respective  amounts   of   fine  and  coarse  aggregate 
and  the  consistencies  of  the  mixtures. 

(b)  The  number  and  size  of  vibrators  of  whatever  type  used  should  be  such  as  to 
insure  vibration  throughout  the  entire  volume  of  concrete  to  be  vibrated.  Application 
of  vibrators  should  be  at  points  uniformly  spaced  and  not  farther  apart  than  the  radius 
over  which  vibration  is  visibly  effective.  The  vibration  should  be  such  that  the  concrete 
becomes  uniformly  plastic. 

406.  Pneumatically  Applied  Mortar 

(a)  Construction  utilizing  pneumatically  applied  mortar  has  been  in  the  hands  of  a 
few  organizations  specializing  in  this  field  and  utilizing  equipment  produced  by  a  very 
limited  number  of  manufacturers.  The  type  of  construction  has  been  in  use  for  many 
years  and  considerable  advance  in  technique  and  equipment  has  been  made  during  that 
period,  but  there  is  still  considerable  divergence  in  procedure  between  the  different  users. 
The  purpose  of  this  section  is  to  provide  a  resume  of  accepted  practice  as  supplementary 
to  the  general  specifications. 

(b)  The  results  obtained  in  pneumatically  applying  mortar  depend  to  a  large  extent 
on  the  skill  of  the  operator  and  the  work  should  be  done  only  by  experienced  men. 

(c)  Two  types  of  equipment  are  available,  single  or  double  chamber.  The  single 
chamber  type  is  operated  intermittently,  and  is  adaptable  to  small  jobs  only.  The  double 
chamber  type  which  can  be  operated  continuously  is  the  most  common  type  in  use. 

(d)  The  grading  of  the  sand  is  important  in  obtaining  high  strength  and  density. 
The  sand  should  be  passed  through  a  ^-in.  sieve  and  have  a  fineness  modulus  of  3.0  or 
less.  Stone  sand  subject  to  the  same  grading  limitations  as  natural  sand  gives  satisfactory 
results. 

(e)  The  proportions  of  cement  to  sand  for  various  purposes  should  range  from  1 
part  cement  to  3  parts  sand  to  1  part  cement  to  4^  parts  sand,  in  terms  of  dry  and 
loose  volumes.  The  mortar  in  place  will  have  a  somewhat  lower  proportion  of  sand 
because  of  the  loss  due  to  rebound. 

(f)  Control  of  the  water  content  is  important  for  pneumatically  placed  mortar  in 
order  to  obtain  proper  placement.  The  water  content  should  be  such  that  a  very  slight 
film  of  water  will  form  on  the  surface  of  the  applied  material.  Insufiicient  water  results 
in  dry  porous  spots  and  excess  water  causes  low  strength  and  slipping  of  the  mortar. 

(g)  The  air  and  water  pressure  should  be  maintained  uniform.  The  water  pressure 
should  be  at  least  IS  lb.  per  sq.  in.  higher  than  the  air  pressure  which  should  be  sufficient 
to  give  proper  velocity  to  the  material  leaving  the  nozzle.  To  avoid  excessive  impact  the 
air  pressure  should  not  exceed  7S  lb.  per  sq.  in. 

(h)  The  sand  should  be  neither  excessively  dry  nor  wet — about  four  percent  mois- 
ture by  weight  is  desirable.  Sand  and  cement  should  be  thoroughly  premixed  by  machine 
as  very  little  mixing  takes  place  during  the  application. 


54 


Report    on    Concrete    and    Reinforced    Concrete 


(i)  The  velocity  of  the  material  that  leaves  the  nozzle  should  be  maintained  uniform 
and  should  be  such  as  to  produce  a  minimum  of  rebound  of  the  sand.  The  nozzle  should 
be  held  between  three  and  four  feet  from  the  surface  being  covered  and  should  be  kept 
moving  to  obtain  a  uniform  coating. 

(j)  Special  care  should  be  taken  in  the  removal  of  forms  and  in  the  curing  to  avoid 
cracking  of  the  thin  sections.  Placing  at  temperatures  below  SO  deg.  F.  should  not  be 
attempted  unless  adequate  facihties  are  available  for  keeping  the  mortar  above  SO  deg. 
during  and  after  placing.  The  surface  to  which  mortar  is  applied  should  be  free  from 
frost. 

(k)  Shooting  strips  should  be  used  at  corners,  edges,  and  on  surfaces  where  neces- 
sary to  obtain  true  lines  and  proper  thickness.  The  surface  of  the  mortar  may  be  "steel 
floated"  when  a  very  smooth  finish  is  desired. 

(I)  The  placement  equipment  should  be  thoroughly  cleaned  whenever  work  is  to  be 
stopped  for  a  period  in  excess  of  30  min. 

(m)  The  position  and  size  of  reinforcement  where  required  and  the  thickness  of 
coating  varies  with  the  use  of  the  pneumatically  applied  mortar  and  should  be  within 
the  limitations  given  below.  Square  reinforcement  bars  should  not  be  used. 


Use 

Reinforcement 

Thickness 

Encasement  of 
Steel 

Galvanized  welded  fabric  2  x  2 — No.  12 
and  No.  12  or  3  x  3— No.  10  and  No.  10 
bent  to  templet,  and  securely  fastened 
to  the  steel  at  M  in.  from  steel. 

IJ^  to  2  in.  placed  in  two 
layers,  second  is  H  in. 
thick. 

Floor,  Wall  and 
Roof  Slabs 

Rods  and  galvanized  welded  fabric  not 
larger  than   %  in.  diameter  sufficient 
for  load  requirements.    Reinforcement 
not  closer  than  ^  in.  to  exposed  sur- 
face. 

As  determined  by  load  re- 
quirements. Placed  in 
two  or  more  layers. 
Final  coat  3^  in.  thick. 

Stucco  or  Facing 
on  Tile,  Terra 
Gotta,  Brick, 
and  Concrete. 

Not  necessary  except  for  badly  disinte- 
grated surfaces  in  which  case  use  gal- 
vanized welded  fabric  equal  to  0.2%  of 
cross-sectional  area  of  tae  mortar    se- 
curely attached  to  the  structure  and 
located  at  middle  of  coating. 

^  in.  to  1  in.  placed  in 
two  layers,  second  }4 
in.  tnick.  Screed  to 
proper  surface  before 
applying  second  layer. 

Concrete 
Restoration 

Galvanized  welded  fabric  2  x  2— No.  12 
and  No.  12  or  3  x  3— No.  10  and  No.  10 
securely  attached  to  old  structure  at 
middle  of  coating.    Two  layers  of  mesh 
for  thickness  of  3  in.  and  greater. 

Not  less  than  1  in. 
placed  in  two  or  more 
layers.  Screed  to  pro- 
per surface  before  ap- 
plying final  M  in- 
layer. 

Linings  for 
Reservoirs 

Galvanized  welded  fabric  4  x  4 — No.  8 
and  No.  8  or  greater  at  middle  of  coat- 
ing. 

Not  less  than  2  in., in  two 
or  more  layers. 

Linings  for 
Canals  and 
Ditches 

Galvanized  welded  fabric  not  less  than 
0.2%  of  cross-sectional  area  of  mortar 
middle  of  slab. 

1  to  2  in.  two  or  more 
layers. 

Details    of    Design    and    Construction ^ 


Chapter  V — Details  of  Design  and  Construction 

501.  General 

(a)  The  monolithic  character  of  reinforced  concrete  construction  creates  problems 
in  details  of  design  as  well  as  in  construction  that  require  adequate  treatment  if  the 
structure  is  to  be  durable,  structurally  sound,  and  acceptable  in  appearance. 

(b)  To  insure  durability  where  the  structure  is  exposed  to  the  weather,  the  rein- 
forcement should  be  protected  by  an  adequate  covering  of  concrete.  For  exposure  to  sea 
water,  corrosive  fluids,  or  high  temperatures,  extra  precautions  are  necessary.  In  order 
to  maintain  a  proper  amount  of  covering  the  metal  reinforcement  should  be  accurately 
and  firmly  held  in  position. 

(c)  Only  comparatively  small  structures  can  be  cast  without  interruption.  Conse- 
quently, construction  joints  in  the  concrete  and  splices  in  the  metal  reinforcement  are 
required. 

(d)  In  addition  to  construction  joints  it  is  frequently  necessary  to  articulate  a 
structure  to  provide  for  length  changes  due  to  temperature  variation  and  shrinkage. 
Also  in  some  cases  joints  are  introduced  for  structural  or  design  purposes,  as  in  open 
spandrel  or  hinged  arches  and  some  types  of  framed  structures.  Joints  of  this  character 
need  special  attention  on  the  part  of  the  designer  and  the  construction  organization  if 
they  are  to  function  properly.  Where  concrete  structures  are  exposed  to  water  pressure, 
there  is  added  to  these  requirements  the  necessity  of  maintaining  watertightness. 

(e)  The  use  of  reinforcement  in  distributing  and  minimizing  the  formation  of  cracks 
should  be  given  careful  attention. 

(f)  The  following  recommendations  cover  some  of  the  more  important  construction 
details,  and  are  intended  to  guide  in  the  design  as  well  as  in  the  construction.  These 
should  be  considered  in  connection  with  Sec.  SOl-S  to  Sll-S  of  the  specifications. 

Details  of  Reinforcement 

502.  Splicing  of  Reinforcement 

When  it  is  necessary  to  splice  reinforcement,  the  spUce  should  develop  the  strength 
of  the  bar  by  bond  resistance  over  the  surface  limited  by  the  length  of  sphce.  In  lapped 
spUces  the  bars  should  be  placed  in  contact  and  wired  together.  The  minimum  distance 
recommended  in  Sec.  504  should  be  considered  to  apply  to  the  space  remaining  between 
a  pair  of  bars  so  sphced  and  adjacent  bars  or  splices.  Wherever  possible,  spUces  of  adja- 
cent bars  should  be  staggered.  A  welded  or  mechanical  connection  should  develop  the  full 
strength  of  the  bars. 

503.  Offsets  in  Column  Reinforcement 

When  changes  in  the  cross  section  of  a  compression  member  occur,  the  longitudinal 
reinforcement  should  be  sloped  the  full  length  of  the  member  or  offset  in  a  region 
where  lateral  support  is  provided  sufficient  to  resist  the  transverse  component  of  the 
thrust  in  the  inclined  portion  of  the  offset.  Where  offsets  are  used,  the  slope  of  the 
inchned  portion  of  the  bars  should  be  not  more  than  1  to  6  with  respect  to  the  axis 
of  the  members  (see  Sec.  854  (c)). 

504.  Clearance  and  Embedment 

Reinforcement  bars  should  be  located  a  sufficient  distance  from  the  surfaces  of 
members  and  from  each  other  to  afford  adequate  embedment  for  bond  resistance  and 
for  satisfactory  placing.  The  minimum  spacing  between  parallel  bars  should  be  2J/^  times 


56 Report    on    Concrete    and    Reinforced    Concrete 

the  diameter  of  round  or  3  times  the  side  dimension  of  square  bars,  but  in  no  case 
should  the  clear  distance  between  bars  be  less  than  1^  times  the  maximum  size  of  the 
coarse  aggregate  nor  less  than  1  in.  in  beams  and  girders,  nor  V/z  in.  in  columns.  See 
Sec.  854  for  recommendations  concerning  column  reinforcement. 

505.  Fire  Protection 

(a)  Metal  reinforcement  should  be  protected  against  fire  by  the  minimum  thicknesses 
of  concrete  shown  in  the  following  table  for  the  various  classes  of  structural  members 
and  types  of  aggregates  (designated  as  Group  1  and  Group  2,  and  defined  in  Specifica- 
tions Sec.  22S-S). 

Minimum  Thickness  of  Concrete — in. 
Fire  Resistance 

4  hr.  3  hr.  2  hr.  1  hr. 

For  columns,  beams,  girders,  and  un- 
protected ribbed  slabs 

Group  1,  Aggregate 1}4,  1/^  ^M  1 

Group  2,  Aggregate 2  IJ^  13^  1 

For  solid  slabs 

Group  1,  Aggregate H  H  H  yi 

Group  2,  Aggregate Jl  %  %  M 

(b)  In  ribbed  floor  construction  where  ribs  are  spaced  not  more  than  30  in.  in  the 
clear,  and  formed  between  permanent  masonry  filler  blocks,  or  between  permanent  or 
removable  forms,  and  having  the  additional  protection  of  ^  in.  of  Portland  cement  or 
gypsum  plaster  applied  directly  to  the  ribs  and  masonry  fillers,  or  to  metal  lath  attached 
to  or  suspended  below  the  ribbed  construction,  the  fire  protection  requirements  for  the 
ribs  should  be  those  indicated  in  the  table  for  solid  slabs. 

506.  Moisture  Protection 

(a)  At  those  surfaces  of  footings  and  other  principal  structural  members  in  which 
the  concrete  is  deposited  directly  against  the  ground,  metal  reinforcement  should  have  a 
minimum  covering  of  three  inches  of  concrete.  At  other  surfaces  of  concrete  exposed  to 
the  ground  or  to  severe  weathering  conditions,  metal  reinforcement  should  be  protected 
by  not  less  than  two  inches  of  concrete.  At  undersides  of  slabs  exposed  to  weather  one 
inch  should  be  provided. 

(b)  Where  metal  fabric  in  the  form  of  wire  mesh  or  expanded  metal  is  used  as 
reinforcement  for  protective  coatings  on  columns,  beams,  or  girders,  it  should  have  a 
minimum  covering  of  V/i  in.  for  structures  exposed  to  water,  ground,  or  weather,  and  a 
minimum  of  ^  in.  for  structures  not  so  exposed. 

(c)  Where  pneumatically  applied  mortar  is  used  for  moisture  protection,  it  should 
not  be  less  than  IJ^  in.  in  thickness  and  reinforced  with  metal  fabric  as  provided  in 
Sec.  406  (m) .  The  mesh  should  be  securely  fastened  to  the  surface  to  be  protected. 

(d)  In  large  and  monumental  structures  such  as  large  bridges,  locks,  and  dams,  it 
is  recommended  that  the  minimums  enumerated  above  be  increased. 

(e)  Structures  or  structural  elements  exposed  to  the  injurious  action  of  corrosive 
liquids  and  vapors  require  special  designs  of  protective  coverings. 

507.  Concrete  in  Sea  Water 

(a)  For  the  protection  of  the  reinforcement  where  concrete  is  exposed  to  sea  water 
both  the  quality  of  the  concrete  and  the  thickness  of  the  protection  should  fulfill  more 
than  ordinary  requirements.  The  minimum  water  contents  shown  in  Table  1,  Section 
303,  are  recommended.  The  placing  should  be  in  accordance  with  the  specification 
paragraphs,  420-S  and  421-S. 


Expansion    and    Contraction    Joints 


57 


(b)  The  depth  of  protection  for  all  metal  reinforcement,  including  supports,  ties  and 
stirrups,  should  be  a  minimum  of  three  inches  at  all  plane  or  curved  surfaces  and  four 
inches  near  the  corners  of  exposed  members. 

508.  Future  Bonding 

Where  reinforcing  bars  are  to  be  left  protruding  from  a  structure  for  the  purpose 
of  bonding  with  future  additions,  special  care  should  be  taken  to  protect  them  against 
injury  or  corrosion. 

Expansion  and  Contraction  Joints 

509.  Purpose  and  Location 

(a)  If  a  reinforced  concrete  structure  is  free  to  expand  and  contract  with  variations 
in  temperature  or  moisture  conditions  (uniform  over  the  section),  no  stresses  of  any 
importance  will  be  developed.  When  the  movement  of  the  structure  is  restrained,  how- 
ever, or  when  temperature  or  moisture  variations  are  not  uniform  over  the  section, 
stresses  are  introduced  which  should  be  provided  for  in  the  design. 

(b)  Points  requiring  special  consideration  are  located  where  large  changes  in  cross 
section  occur  or  at  corners  in  long  members  where  expansions  or  contractions  may  result 
in  rupture  of  the  side  members.  No  amount  of  reinforcement  will  prevent  the  formation 
of  cracks  in  a  restrained  structure  in  which  the  required  change  in  length  exceeds  the 
extensibility  of  the  concrete,  but  reinforcement  properly  designed  will  serve  to  distribute 
the  cracks. 

(c)  Joints  providing  a  complete  separation  in  the  structure,  when  properly  located, 
can  relieve  the  restraint  and  prevent  or  greatly  minimize  the  development  of  cracks. 
Such  joints  should  be  carefully  designed  with  respect  to  the  type  of  structure  and  should 
provide  for  the  full  expected  movements  without  introducing  local  stresses  severe  enough 
to  rupture  the  concrete.  They  should  be  located  at  predetermined  points  and  fully 
detailed  on  the  drawings.  They  may  or  may  not  be  designed  to  carry  load  or  distribute 
stress  across  the  joint.  Frequently  this  type  of  joint  requires  some  form  of  protection  to 
keep  out  extraneous  material. 

510.  Expansion  Joints  in  Long  Buildings 

(a)  Expansion  joints  are  expensive  and  in  some  cases  difficult  to  maintain.  They 
are,  therefore,  to  be  avoided  if  possible.  In  relatively  short  buildings,  expansion  and  con- 
traction can  be  provided  for  by  additional  reinforcement.  No  arbitrary  spacing  for  joints 
in  long  buildings  can  be  generally  applicable.  In  heated  buildings  joints  can  be  spaced 
farther  apart  than  in  unheated  buildings.  Also,  where  the  outside  walls  are  of  brick  or  of 
stone  ashlar  backed  with  brick,  or  where  otherwise  insulated,  the  joints  can  be  farther 
apart  than  with  exterior  walls  of  lower  insulating  value. 

(b)  In  localities  with  large  temperature  ranges,  the  spacing  of  joints  for  the  most 
severe  conditions  of  exposure  (uninsulated  walls  and  unheated  buildings)  should  not 
exceed  200  ft.  Under  favorable  conditions  buildings  400  to  500  ft.  long  have  been  built 
without  joints  even  in  localities  with  large  temperature  ranges. 

(c)  In  localities  with  small  temperature  ranges,  the  spacing  of  joints  for  unheated 
buildings  or  with  uninsulated  walls  should  not  exceed  300  ft.  In  such  locahtics  buildings 
up  to  700  ft.  long  have  been  successfully  built  without  joints  where  other  conditions 
were  favorable. 

(d)  In  roof  construction,  provision  for  expansion  is  an  important  factor.  The  joints 
in  the  roof  may  be  required  at  more  frequent  intervals  than  in  the  other  portions  of  the 


58 Report   on    Concrete   and   Reinforced    Concrete 

building  because  of  more  severe  exposure.  In  some  cases  expansion  joints  spaced  100  ft. 
apart  have  been  provided  in  roofs  and  not  in  walls  or  floors. 

(e)  Joints  should  be  located  at  junctions  in  L-,  T-,  or  U-shaped  buildings  and  at 
points  where  the  building  is  weakened  by  large  openings  in  the  floor  construction,  such 
as  at  light  wells,  stairs,  or  elevators.  Joints  should  provide  for  a  complete  separation 
from  the  top  of  the  footings  to  the  roof,  preferably  by  separate  columns  and  girders. 

511.  Retaining  Walls 

For  retaining  walls  and  similar  structures  subject  to  large  temperature  and  moisture 
changes,  the  details  suggested  in  Sec.  877  are  recommended. 

512.  Concrete  Trestles 

For  concrete  trestles  and  similar  structures  the  spacing  of  joints  will  depend  upon 
the  temperature  range,  flexibility  of  the  supports,  and  other  structural  requirements.  In 
general,  for  structures  of  this  type  it  is  desirable  to  place  the  joints  not  farther  apart 
than  125  ft.  For  this  type  of  construction  joints,  where  heavy  loads  are  being  trans- 
mitted, shding  joints  should  not  be  used. 

Construction  Joints 

513.  Location  of  Joints 

Wherever  it  is  necessary  to  interrupt  the  placing  of  the  concrete,  an  effort  should  be 
made  to  form  a  joint  that  will  least  impair  the  appearance  or  serviceability  of  the  mem- 
ber or  structure.  Where  such  joints  are  objectionable,  the  drawings  should  clearly  indi- 
cate the  limits  of  the  various  sections  to  be  placed  at  one  operation  and  the  joints 
desired  should  be  fully  detailed.  When  construction  joints  cannot  be  avoided  the  method 
of  procedure  given  in  Sec.  S08-S  to  Sll-S  of  the  specifications  should  be  followed. 

514.  Watertight  Joints 
Where  construction  joints  are  necessary  in  structures  exposed  to  water  pressure,  or 

where  for  other  reasons  the  joints  must  be  watertight,  non-corrosive  metal  water  stops      ; 
should  be  installed. 


Chapter  VI — Waterproofing  and  Protective  Treatments 

601.  General 

The  questions  of  when  to  waterproof  and  what  method  to  use  are  so  largely  matters 
of  individual  cases  that  it  is  hot  possible  to  offer  specific  recommendations  that  will  be 
generally  applicable.  In  the  following  paragraphs  some  comment  is  offered  on  the  gen- 
eral aspects  of  the  problem.  It  is  realized  that  experienced  engineers  are  likely  to  be 
well  informed  on  these  subjects,  but  this  brief  statement  of  the  factors  involved  is 
intended  to  serve  as  a  background  for  the  satisfactory  solution  in  any  individual  case. 

602.  Watertightness  of  Concrete 

(a)  Many  studies  of  permeability  have  shown  that  concrete  of  proportions  suitable 
for  structural  or  hydraulic  work,  if  properly  placed  and  adequately  cured,  is  watertight 
for  all  practical  purposes  even  under  very  high  pressures.  Failure  to  obtain  watertight 
structures  therefore  is  due  either  to  improper  concrete  practice  or  to  such  structural 
features  as  cracks,  joints,  etc.,  which  permit  the  passage  of  water. 

(b)  Observations  on  structures  in  service  have  shown  that  where  water  finds  its 
way  through  the  concrete  itself,  it  is  almost  invariably  through  defective  spots  resulting 


J 


Waterproofing  59 


from  improper  placement  or  mix  proportions.  By  far  the  most  common  source  of  leak- 
age observed  is  at  the  planes  of  contact  between  successive  lifts.  This  usually  results 
from  improper  bond  or  from  porous  concrete  at  the  top  of  the  lift  due  to  watergain. 
Another  common  source  of  leakage  is  found  in  defective  areas  resulting  from  honeycomb 
or  segregation  during  placing.  Obviously,  the  prevention  of  such  defects  is  a  first 
requirement  of  watertight  construction. 

603.  Presence  of  Cracks  and  Joints 

(a)  No  matter  how  impervious  the  concrete  may  be,  or  how  perfectly  placed,  there 
is  always  the  possibility  of  leakage  through  expansion  joints,  construction  joints,  or 
cracks.  In  Sec.  514,  the  use  of  non-corrosive  water  stops  at  joints  is  recommended  where 
watertightness  is  required. 

(b)  Cracks,  such  as  might  result  from  load,  settlement,  temperature  changes,  or 
shrinkage  of  the  concrete  may  be  the  source  of  considerable  and  annoying  leakage  in  a 
structure  exposed  to  direct  water  pressure.  Provision  against  the  formation  of  such 
cracks  can  be  made  by  careful  attention  to  all  features  of  design.  Spacing  and  arrange- 
ment of  contraction  joints  and  proper  distribution  of  reinforcement  can  accomplish 
much  in  the  prevention  of  cracks  which  will  permit  the  entrance  of  water. 

604.  Importance  of  Drainage 

Too  much  emphasis  cannot  be  placed  on  the  need  for  drainage  around  the  structure 
where  unsightliness  or  damage  will  result  from  the  penetration  of  water.  In  many  cases, 
proper  drainage  would  be  all  that  is  needed  to  preserve  the  structure  or  to  protect  the 
interior.  In  the  opinion  of  this  committee,  drainage  should  be  considered  not  as  an 
adjunct  to  waterproofing,  but  rather  as  a  first  requirement  to  which  waterproofing  is 
added  as  a  further  protection. 

605.  Need  for  Some  Type  of  Protection 

In  many  types  of  structures  exposed  on  one  side  to  direct  water  pressure,  it  is  im- 
portant that  the  other  side  be  absolutely  dry.  In  the  case  of  such  structures,  some 
method  of  waterproofing  may  be  necessary  which  takes  into  account  the  possibility  of 
the  occurrence  of  structural  cracks  or  the  presence  of  defective  spots  in  the  concrete. 
Some  of  the  methods  mentioned  below  for  waterproofing  the  concrete  without  a  mem- 
brane may  be  effective  in  such  cases,  or  an  outside  waterproof  membrane  may  be  needed. 
Where  a  membrane  is  necessary,  the  materials  to  be  used  and  the  methods  of  applying 
them  should  be  those  best  adapted  to  the  particular  location  or  structure.  The  problems 
of  this  type  of  waterproofing  are  not  peculiar  to  concrete  construction  and  are  therefore 
outside  the  scope  of  these  recommendations. 

606.  Protection  Against  Weathering 

(a)  Although  concrete  of  normal  proportions,  properly  placed  and  cured,  is  imper- 
vious to  the  actual  passage  of  water  under  pressure,  it  is  not  immune  to  the  passage  of 
water  due  to  capillary  forces.  As  indicated  in  Table  1  of  Sec.  303  (b),  concrete  even 
though  properly  made  and  cured,  is  affected  by  weathering  in  proportion  to  the  severity 
of  exposure  and  to  the  water-cement  ratio  of  the  paste.  The  greater  the  water-cement 
ratio,  the  greater  the  amount  of  free  water  that  may  be  present  and  the  more  destruc- 
tive the  effect  of  the  repeated  freezing  and  thawing  and  wetting  and  drying.  Laboratory 
tests,  as  well  as  field  experience,  have  shown  that  a  high  degree  of  resistance  can  be 
obtained  with  properly  placed  and  well-cured  concrete  by  the  use  of  low  water-cement 
ratios.  Low  water-cement  ratios  require  the  use  of  rich  mixes  or  some  method  of  placing 
which  permits  concrete  of  stiffer  consistencies  to  be  properly  consoHdated. 


60 Report    on    Concrete    and    Reinforced    Concrete 

(b)  There  is  also  evidence  from  both  experiment  and  experience  to  show  that  cer- 
tain protective  coatings  which  are  effective  in  sealing  the  concrete  to  the  penetration  of 
moisture  are  effective  in  increasing  the  resistance  to  the  destructive  action  of  alternate 
freezing  and  thawing.  Such  protective  coatings  or  a  membrane  waterproofing,  therefore, 
may  frequently  be  necessary  as  a  protection  against  weathering. 

607.  Dampproofing 

(a)  Water  which  enters  the  concrete  wall  by  absorption  will  be  distributed  by  the 
capillary  forces  throughout  the  concrete  until  a  condition  of  saturation  is  reached  or 
until  evaporation  balances  the  inflow.  If  there  is  a  continuing  supply  of  free  water 
available  on  one  surface  and  evaporation  can  take  place  from  another,  there  will  be  a 
continuing  passage  of  water.  If  the  air  becomes  saturated  or  the  temperature  drops 
sufficiently,  moisture  will  condense  on  the  wall.  When  this  occurs,  or  if  a  seal  coat  is 
applied  to  the  face  away  from  the  source  of  the  moisture,  the  outflow  of  water  ceases 
and  saturation  of  the  concrete  is  encouraged.  The  prevention  of  moisture  penetration 
by  capillarity  is  commonly  referred  to  as  "dampproofing"  as  contrasted  with  "water- 
proofing," which  impHes  the  prevention  of  an  actual  flow  of  water  through  the  structure. 

(b)  The  appearance  of  moisture  on  a  wall  does  not  always  indicate,  of  course,  that 
the  water  vapor  in  the  air  is  entirely  due  to  passage  of  water  through  the  wall.  Often- 
times, dampness  on  the  inside  of  a  wall  is  mistakenly  ascribed  to  moisture  penetration, 
when  in  fact  it  is  merely  the  result  of  condensation,  on  the  cold  wall,  of  moisture  which 
originated  elsewhere. 

(c)  Dampness  due  to  absorbed  water  or  condensed  water  vapor  can  develop  on  and 
within  concretes  through  which  water  will  not  "flow"  even  under  great  pressure.  The 
remedy  is  to  seal  the  pores  on  the  side  exposed  to  the  moisture.  Most  of  the  methods 
mentioned  below  for  waterproofing  should  be  effective  in  preventing  the  entry  of  water 
into  concrete.  Other  and  more  simple  methods  might  also  be  effective.  The  use  of  a  seal 
coat  on  the  side  away  from  the  water  may  be  effective  for  some  time,  but  if  the  wall  is 
subject  to  freezing  temperatures  the  use  of  such  seal  coat  may  in  the  long  run  result  in 
greater  damage  than  leaving  the  wall  unprotected. 

608.  Protection  of  Reinforcement 

Spalling  of  concrete  due  to  corrosion  of  the  reinforcement  is  frequently  the  cause 
of  damage  to  structures.  In  structures  exposed  alternately  to  wetting  and  drying,  this  is 
probably  the  most  common  cause  of  deterioration.  Where  the  concrete  protection  is  in 
accordance  with  Sec.  506,  the  only  special  requirement  for  protection  of  the  reinforce- 
ment will  be  that  necessary  to  prevent  the  moisture  reaching  the  reinforcement  through 
cracks  or  defective  areas. 

609.  Protection  Against  Corrosive  Substances 

Research  and  experience  have  developed  various  types  of  treatments  for  protecting 
concrete  against  the  effect  of  exposure  to  various  types  of  substances.  The  committee  has 
assembled  in  Appendix  1  the  best  available  information  on  the  effect  of  some  of  the 
more  common  types  of  substances  and  the  treatments  which  have  been  found  helpful  in 
retarding  or  preventing  corrosion. 

610.  Coatings  on  the  Side  Away  from  the  Water  Pressure 

The  desirable  procedure  in  waterproofing  a  structure  is  to  apply  protection  on  the 
side  exposed  to  water  pressure.  Frequently,  however,  this  is  impossible  and  it  is  neces- 
sary to  apply  waterproofing  on  the  opposite  side.  Where  the  waterproofed  surface  is  pro- 
tected from  freezing  temperatures,  this  procedure  has  some  advantage  in  that  in  the  case 


Waterproofing 61 


of  failure  of  the  waterproofing  it  is  easier  to  locate  the  source  of  weakness  and  make 
the  necessary  repair.  Where  the  waterproofed  surface  is  to  be  exposed  to  freezing  tem- 
peratures, however,  the  method  is  not  to  be  recommended.  The  freezing  of  water  in  the 
concrete  immediately  underneath  the  protective  coating  will  not  only  damage  the  coating, 
but  injure  the  concrete  itself.  The  concrete  may  be  affected  more  rapidly  with  the 
coating  than  it  would  if  the  coating  were  absent,  when  there  would  be  less  opportunity 
for  the  concrete  to  become  saturated  at  the  surface. 

611.  Waterproofing  with  Portland  Cement  Mortar 

(a)  A  plaster  coat  of  Portland  cement  mortar  on  the  side  of  a  wall  exposed  to  water 
pressure,  when  properly  applied  and  cured,  will  effectively  protect  porous  concrete 
against  the  penetration  of  water  under  pressure.  However,  any  structural  movement  re- 
sulting from  load,  settlement,  shrinkage,  etc.,  which  will  crack  the  structure,  will  crack 
the  plaster,  thereby  destroying  its  waterproofing  value  at  these  points.  The  use  of  this 
type  of  waterproofing,  of  course,  would  require  that  any  cracks  existing  in  the  concrete 
be  chipped  out  and  filled  with  mortar  before  applying  the  plaster  coat. 

(b)  Portland  cement  plaster  applied  on  the  side  of  the  structure  away  from  the 
water  pressure  has  been  successfully  used  against  considerable  heads.  Cracks  and  defec- 
tive spots  are  readily  filled  by  mortar  applied  from  the  inside.  When  skillfully  done,  this 
method  can  be  used  to  shut  off  actual  flowing  leaks.  When  the  quantity  of  water  flow 
is  considerable,  some  accelerating  agent,  which  will  reduce  the  setting  time  to  a  few 
minutes,  may  be  necessary. 

(c)  This  method  of  waterproofing  has  the  advantage  that  cracks  occurring  after  the 
plaster  is  in  place  can  be  readily  located  and  repaired.  It  does  not,  of  course,  prevent 
possible  damage  to  the  structure  from  corrosion  or  weathering  even  though  the  interior 
may  be  kept  dry.  It  should  not  be  used  where  the  surface  is  to  be  exposed  to  freezing 
temperatures.  The  method,  however,  has  its  uses  and  in  some  instances  may  be  the 
only  possible  one. 

(d)  Good  plastering  technique  is  required  for  successful  waterproofing  with  Portland 
cement  plaster,  whether  applied  on  the  inside  or  the  outside.  This  includes  such  details 
as  clean  surfaces,  proper  suction  at  the  time  of  application,  plastic  consistency,  and  the 
proper  curing  of  each  coat.  The  mortar  should  be  about  a  1  :  2  mix  applied  in  at  least 
two  coats,  each  coat  about  ^  in.  thick.  Powdered  iron  preparations  (Sec.  613  (e) )  are 
sometimes  added  to  the  mortar. 

612.  Integral  Waterproofing 

(a)  Powdered  Admixtures. — Misconception  of  the  function  of  admixtures  and  fre- 
quent overstatement  of  their  properties  have  led  to  much  misunderstanding  regarding 
their  use.  In  very  lean  mixtures  almost  any  fine,  inert  material  will  improve  the  water- 
tightness  of  concrete.  This  improvement  comes  about  in  two  ways.  First,  with  the  extra 
fines  the  paste  will  have  a  more  plastic  consistency  which  will  segregate  less  and  be  more 
watertight.  Second,  the  more  plastic  paste  will  improve  the  workability  of  the  concrete 
and  thereby  guard  against  those  defects  in  placing  which  leave  open  channels  for  water 
to  pass  through  the  member. 

In  rich  mixes,  on  the  other  hand,  where  the  tenient-water  paste  is  already  of  plastic 
consistency,  and  of  sufficient  quantity  to  give  the  needed  workability,  powdered  admix- 
tures serve  no  useful  purpose  so  far  as  watertightness  is  concerned.  For  mixtures  in  this 
range  most  of  the  powdered  admixtures  require  increased  water  content,  as  compared 
with  the  plain  mix,  which  reduces  the  quality  of  the  paste  and  detracts  from  its 
watertightness. 


62 Report    on    Concrete    and    Reinforced    Concrete 

The  field  of  powdered  admixtures,  therefore,  for  waterproofing  concrete  will  depend 
upon  the  character  of  the  concrete  mix  just  as  much  as  upon  the  characteristics  of  the 
admixtures.  Lean  mixtures  or  normal  mixtures  deficient  in  fines  in  the  aggregate  can  be 
improved  by  some  of  the  admixtures.  On  the  other  hand,  rich  mixes,  and  normal  mixes 
in  which  adequate  fines  are  present,  may  be  reduced  in  watertightness  by  the  presence 
of  these  added  fines. 

(b)  Water-Repellent  Admixtures. — Stearates  or  other  water-repellent  materials  have 
found  considerable  use  as  admixtures  for  concrete  where  the  penetration  of  moisture  is 
to  be  retarded.  These  materials  reduce  the  absorption  and  retard  penetration  of  moisture 
by  capillary  action.  They  do  not  seem  to  be  effective  ^s  waterproofing  when  the  con- 
crete is  exposed  to  direct  water  pressure.  Some  of  these  water-repellent  admixtures 
improve  the  workability  of  concrete  and  thereby  may  improve  the  watertightness  of  a 
wall  exposed  to  direct  water  pressure. 

613.  Waterproofing  with  Surface  Treatments 

(a)  There  are  a  number  of  surface  materials  which  can  be  applied  to  concrete  for 
protection  of  the  surface  against  weathering  or  other  attack.  Those  referred  to  in  Sec. 
609  and  listed  in  detail  in  Appendix  1  are  materials  which  have  been  found  especially 
effective  for  certain  uses.  Some  of  these  may  be  sufficiently  permanent  to  serve  as  a 
waterproofing  or  dampproofing  coating.  In  the  following  paragraphs  are  listed  some 
of  those  which  have  been  found  particularly  adaptable. 

As  in  the  case  of  cement  mortar  plaster,  any  structural  movement  which  produces 
a  crack  will  break  these  applied  coatings  and  destroy  their  waterproofing  value  at  these 
points.  Likewise,  none  of  these  surface  treatments  is  of  sufficient  body  or  strength  to 
span  cracks  already  in  the  structure  and  prevent  the  entrance  of  water.  As  pointed  out 
in  Sec.  610,  these  materials,  when  used  on  the  side  away  from  the  pressure,  may 
accelerate  deterioration  of  a  wall  if  exposed  to  freezing  temperature. 

(b)  Bituminous  Coatings. — There  are  a  number  of  asphaltic  and  tar  coatings  which 
are  available  for  application  to  concrete.  Some  of  these  are  to  be  appUed  hot;  others, 
which  depend  for  their  hardening  on  the  evaporation  of  a  liquefier,  are  to  be  applied 
cold.  The  extent  to  which  these  materials  can  waterproof  concrete  and  the  period  over 
which  the  protection  will  remain  effective,  depend  not  only  upon  the  materials  them- 
selves, but  on  the  condition  of  the  concrete  to  which  they  are  applied  and  the  type  of 
exposure  to  which  the  surfaces  will  be  subjected.  This  same  comment  might  with  equal 
propriety  be  applied  to  the  other  materials  mentioned  below. 

(c)  Oil,  Oil  Paints,  or  Resin  Combinations. — Linseed  oil  by  itself,  or  in  com- 
bination with  resinous  varnishes,  makes  a  very  satisfactory  coating  material  for  ordi- 
nary weathering  and  many  other  types  of  exposure.  Oil  paints  based  on  linseed  or  other 
weather-resisting  oil  also  have  value.  The  preparation  of  the  surface  and  the  application 
of  the  materials  should  be  done  in  accordance  with  the  best  painting  technique  with 
particular  reference  to  the  type  of  materials  being  used. 

(d)  Portland  Cement  Paints. — Mixtures  of  Portland  cement  and  water  or  specially 
prepared  combinations  consisting  mainly  of  Portland  cement  are  shown  to  have  con- 
siderable value  in  resisting  the  penetration  of  water  into  concrete  surfaces  under  condi- 
tions of  moderate  exposure.  The  use  of  these  materials  requires  that  special  attention  be 
given  to  curing  methods  to  develop  their  greatest  effectiveness. 

(e)  Powdered  Iron  Preparations. — Mixtures  of  pulverized  iron  and  cement,  usually 
with  some  agent  designed  to  hasten  the  oxidation  of  the  iron,  have  been  used  for  water- 
proofing concrete  surfaces.  These  are  usually  applied  with  a  brush,  either  in  a  thin 
coating  like  a  paint,  or  in  a  stiffer  consistency  to  a  measurable  thickness.  The  water- 


Surface    Finishes  63 


proofing  effect  is  considered  to  result  from  the  formation  of  the  oxide  of  iron  within 
the  pores  of  the  concrete.  The  agent  most  commonly  used  to  accelerate  the  oxidation  of 
the  iron  is  ammonium  chloride.  These  materials  are  also  sometimes  mixed  with  cement 
mortar  for  use  in  waterproofing  (see  Sec.  611). 

(f)  Proprietary  Surface  Treatments. — Many  surface  treatments  of  a  proprietary 
nature  are  available  for  painting  concrete  which  are  based  on  some  of  the  foregoing  or 
similar  materials.  The  use  of  such  proprietary  compounds  should  be  restricted  to  those 
which  have  been  proven  by  service  test  and  which  are  susceptible  to  tests  that  will  insure 
uniformity.  They  should  always  be  limited  to  the  type  of  service  for  which  they  are 
intended  and  the  method  of  application  should  be  strictly  in  accordance  with  the 
directions  of  the  manufacturer. 

614.  Bituminous  Membrane  Waterproofing 

(a)  This  method  is  particularly  adaptable  to  large  areas  where  there  is  some  uncer- 
tainty as  to  the  possibihty  of  further  cracking  in  the  structure  which  would  render  other 
forms  of  waterproofing  ineffective.  It  involves  the  use  of  a  membrane  consisting  of  one 
or  more  layers  of  bitumen-saturated  cotton  fabric  or  felt,  or  combinations  of  both 
materials  cemented  together  (and  to  the  surface  waterproofed  if  a  priming  coat  is  used) 
by  means  of  bituminous  coatings.  The  bitumen  to  be  used  for  the  saturant  and  coating 
should  be  either  asphalt  or  tar.  The  technique  of  applying  this  type  of  waterproofing  is 
well  estabhshed  and  organizations  and  workmen  experienced  in  its  use  are  generally 
available. 

(b)  Where  there  is  any  possibility  that  the  membrane  will  be  punctured  by  the 
backfilling  material,  it  should  be  protected  by  an  additional  layer  of  masonry  or  by 
some  such  method  as  Portland  cement  mortar  or  bituminous  mastic,  or  by  an  asphalt 
blanket  or  bituminous  mastic  blocks. 


Chapter  VII — Surface  Finishes 

701.  General 

(a)  Surface  finish  is  a  term  used  to  denote  the  process  or  method  of  mixing,  plac- 
ing, and  treating  concrete  to  produce  a  desired  appearance  and  texture  of  the  surface. 

(b)  The  requirements  of  the  sections  of  this  Report  relating  to  materials,  forms, 
mixing,  curing,  conveying,  depositing,  and  protection  of  concrete  should  apply  except  as 
they  may  be  modified  by  these  special  requirements. 

(c)  Concrete  should  be  placed  in  one  continuous  operation  between  prescribed  ex- 
pansion or  construction  joints,  unless  the  drawings  indicate  other  points  where  the  plac- 
ing of  concrete  can  be  discontinued. 

(d)  The  same  brand  of  cement,  the  same  kind  and  size  of  aggregates,  the  same  pro- 
portions and  type  of  finish  should  be  used  where  it  is  desired  to  duplicate  texture  and 
appearance  on  any  showing  surface. 

702.  Forms 

(a)  Forms  for  finished  surfaces  should  be  smooth  and  mortar  tight.  If  wood  forms 
are  used,  the  boards  must  be  uniform  in  thickness,  tongued  and  grooved,  smoothly 
finished  on  the  surface  next  to  the  concrete,  evenly  matched  and  tightly  placed,  except 
where  the  desired  surface  or  appearance  requires  special  treatment. 

(b)  The  forms  should  be  so  constructed  as  to  be  removable  in  sections  without 
marring  or  damaging  the  surface  of  the  concrete.  Forms  should  be  removed  as  soon  as 
possible  in  order  to  make  necessary  repairs  and  finish  the  surface.  As  soon  as  forms  are 


64 Report    on    Concrete    and    Reinforced    Concrete 

removed  any  undesired  fins  or  other  projections  on  the  surface  should  be  carefully  re- 
moved, offsets  leveled,  and  voids  or  damaged  places  immediately  saturated  with  water 
and  repaired  by  filling  with  a  concrete  or  mortar  of  the  same  composition  as  was  used 
in  the  surface.  After  making  the  necessary  repairs  the  surface  should  be  finished  with  a 
wood  float  so  as  to  be  free  from  streaks,  discolorations  or  other  imperfections.  Plastering 
should  not  be  permitted  and  a  steel  trowel  should  not  be  used  to  finish  surfaces. 

703.  Preparation  for  Surface  Finish 

(a)  Where  a  surface  mortar  is  to  be  the  basis  of  the  finish,  the  coarse  aggregate 
should  be  worked  back  from  the  forms  with  a  suitable  tool  so  as  to  bring  a  full  surface 
of  mortar  against  the  forms,  care  being  taken  to  prevent  the  formation  of  voids  and 
aggregate  pockets. 

(b)  Where  a  special  surface  finish  is  called  for  on  the  drawings  or  in  the  specifica- 
tions, the  work  of  preparation  should  be  carried  out  as  specified. 

Decorative  Finishes 

704.  General 

(a)  Modern  materials  and  methods  may  be  used  in  the  decorative  treatment  of 
architectural  concrete  to  express  the  designer's  ideas  and  taste  in  a  wide  variety  of 
motifs,  color,  and  texture. 

(b)  Decorative  finishes  on  exposed  concrete  surfaces  may  be  classified  as: 

1.  Precast  ornament 

2.  Monolithic  ornament 

3.  Surface  treatment  after  removal  of  forms 

4.  Applied  finish 

705.  Precast  Ornament 

Precast  ornamental  units  should  be  applied  to  the  inside  face  of  forms  or  set  in 
framed  openings  in  the  structural  form  work.  Such  units  are  ordinarily  made  of  cast 
stone  from  approved  models.  Positive  anchorage  into  concrete  should  be  made  by  means 
of  rabbets,  lugs,  non-corrodible  metal  anchors,  or  other  approved  means  of  anchorage. 

706.  Monolithic  Ornament 

(a)  Ornament  is  produced  monolithically  by  forming  concrete  with  negative  models 
or  molds.  The  precast  models  or  stamped  forms  should  be  accurately  and  securely  set  in 
the  structural  forms.  Special  treatment  of  absorptive  molds  should  be  provided  to  pre- 
vent the  absorption  of  moisture.  Particular  care  is  required  in  the  design  of  the  mixtures 
and  in  placing  ornamental  concrete  to  assure  structural  soundness  and  the  desired  finish. 

(b)  Finished  samples  of  positive  models  should  be  submitted  and  approved  as  to 
craftsmanship,  form,  texture,  and  appearance. 

(c)  Construction  joints  in  monolithic  ornament,  when  necessary,  should  be  located 
and  constructed  in  such  a  manner  as  to  be  unobjectionable  in  the  finished  work.  When 
molds  are  removed  in  less  than  seven  days,  the  surface  should  be  immediately  sprinkled 
with  water  and  kept  wet  until  the  concrete  is  at  least  seven  days  old.  All  ornamental 
work  should  be  protected  from  damage  until  it  is  accepted. 

707.  Surface  Treatment  after  Removal  of  Forms 

(a)  The  desired  appearance,  texture,  and  finish  for  the  surface  should  be  deter- 
mined from  sample  surfaces.  Form  linings,  such  as  sheet  metal,  fiber,  or  manufactured 
board,  may  be  used  to  produce  concrete  surfaces  with  specified  markings  or  patterns. 


S  11  r  f  a  c  ('    F  i  n  i  s  h  e  s  65 


(b)  Where  a  special  facing  mix  with  selected  aggregates  is  to  be  used,  it  should  be 
placed  to  the  required  thickness  and  in  such  a  manner  as  to  bond  securely  with  th? 
backup  concrete. 

(c)  The  time  of  removal  of  face  forms  will  depend  upon  the  type  of  surface  finish 
desired.  For  scrubbed  finish  the  face  forms  should  be  removed  as  soon  as  safety  permits 
and  before  the  surface  becomes  too  hard.  For  rubbed,  sand-blasted,  or  tooled  finishes, 
the  surface  must  be  thoroughly  cured  and  hard  before  finishing. 

708.  Type  of  Finish 

(a)  Rubbed  Finish.— The  surface  should  be  thoroughly  wetted,  and  rubbed  or 
ground  with  carborundum  or  other  abrasive  until  it  presents  a  uniform  and  smooth 
appearance.  Cement  mortar  may  be  used  in  the  rubbing,  but  the  surface  should  not  be 
brush  coated  with  cement  or  grout  after  rubbing. 

(b)  Scrubbed  Finish. — The  surface  should  be  thoroughly  wetted  and  scrubbed  with 
stiff  fiber  or  wire  brushes  using  water  freely  until  the  surface  film  of  mortar  is  removed 
and  the  aggregate  uniformly  exposed.  The  surface  should  then  be  rinsed  with  clean 
water.  If  portions  of  the  surface  have  become  too  hard  to  scrub  in  equal  relief,  dilute 
hydrochloric  acid  (ccmmercial  acid  diluted  with  4  to  10  parts  water)  may  be  used  to 
facilitate  the  scrubbing,  the  acid  being  removed  from  the  finished  surface  with  clean 
water. 

(c)  Sand-Blasted  Finish. — The  thoroughly  cured  concrete  surface  should  be  sand- 
blasted with  hard,  sharp  sand  until  the  aggregate  is  in  uniform  relief. 

(d)  Tooled  Finish. — The  thoroughly  cured  concrete  surface  should  be  dressed  with 
tools  to  a  uniform  texture  and  even  face.  The  tools  ordinarily  used  are  electric  or  air  or 
hand  tools,  giving  various  textured  surfaces  such  as  hand-tooled,  rough  or  fine  pointed, 
crandaUed,  or  bush-hammered,  as  specified  and  as  selected  from  sample  surfaces. 

(e)  Sand-Floated  Finish. — The  forms  should  be  removed  before  the  surface  has 
fully  hardened;  the  surface  wetted  and  rubbed  with  a  wood  float  by  a  uniform  circular 
motion,  fine  sand  being  rubbed  into  the  surface  until  the  resulting  finish  is  even  and 
uniform. 

709.  Applied  Finish 

(a)  With  applied  stucco  or  plaster  finishes  the  surface  of  the  concrete  should  be 
removed  to  a  depth  of  at  least  -h  in.,  exposing  the  aggregate  and  leaving  a  clean,  firm, 
granular  surface  for  the  permanent  adhesion  of  the  finish.  A  chemical  compound  may 
be  used  on  the  inside  of  forms  to  retard  the  setting  of  the  surface  concrete,  in  which 
case  all  loose  material  should  be  removed  and  surface  thoroughly  cleaned  before  finish- 
ing. If  mechanical  treatment,  such  as  hacking  or  chipping  or  grinding  is  used,  care 
should  be  taken  to  leave  no  untreated  surfaces.  A  mechanical  bonding  surface  may  be 
formed  by  using  a  suitable  form  material  or  form  lining. 

(b)  When  applying  the  first  coat  of  stucco  or  plaster,  the  concrete  should  be  thor- 
oughly wetted  but  should  have  no  free  water  on  the  surface. 

Wearing  Surfaces 

710.  One-Course  Work 

In  one-course  work  the  slabs  should  be  placed  continuously  for  the  full  thickness 
without  change  of  proportions.  The  least  quantity  cf  mixing  water  should  be  used  to 
meet  placing  conditions.  The  proportions  should  be  such  that  not  over  5  gal.  of  mixing 
water,  including  that  carried  by  the  aggregate,  is  used  per  94-lb.  sack  of  cement.. 


66 Report    on    Concrete    and    Reinforced    Concrete 

711.  Two-Course  Work 

(a)  In  two-course  work  the  wearing  surface  or  topping  may  be  applied  either 
before  or  after  the  base  has  hardened.  For  pavements  and  driveways  the  top  coat 
should  have  a  minimum  thickness  of  2  in.  Floors  subject  to  heavy  wear  should  have  a 
minimum  thickness  of  1  in.  For  walks  and  ordinary  floors  54  ^^-  ^^Y  ^^  used. 

(b)  On  an  unhardened  base  the  concrete  topping  should  be  applied  within  45  min. 
after  the  concrete  base  is  in  place.  The  unhardened  base  course  should  be  free  from 
water,  laitance,  foreign  matter  and  loose  particles. 

(c)  For  a  hardened  base  the  surface  should  be  roughened  to  improve  bonding, 
should  be  thoroughly  wetted  just  prior  to  placing  the  finish,  and  a  thin  coat  of  neat 
cement  paste  should  be  broomed  into  the  surface  for  a  short  distance  ahead  of  the  top- 
ping. The  wearing  course  should  be  immediately  applied. 

712.  Aggregates 

Aggregates  should  meet  the  requirements  of  specification  Sec.  207-S  to  219^5. 
Coarse  aggregates  should  be  graded  from  No.  4  to  5^  in.  or  from  No.  4  to  J^  in. 

713.  Proportions 

For  surfaces  not  subjected  to  severe  wear  or  heavy  abrasion  the  proportion  should 
be  one  part  cement  to  not  more  than  two  parts  fine  aggregate  by  volume.  For  surfaces 
subjected  to  severe  wear  or  heavy  abrasion  the  proportions  should  be  one  part  cement, 
not  more  than  one  part  fine  aggregate,  and  not  more  than  two  parts  coarse  aggregate  of 
the  specified  grading. 

714.  Finishing 

(a)  Topping  applied  to  an  unhardened  base  should  be  struck  off  to  a  true  and 
even  surface  and  finished  to  the  desired  smoothness  with  a  wood  float  and  steel  trowel, 
or  with  a  mechanical  float  machine  and  steel  trowel.  Cement  or  a  mixture  of  cement 
and  aggregate  should  not  be  sprinkled  on  the  surface  to  absorb  moisture  or  to  stiffen 
the  mix. 

(b)  Topping  applied  to  a  hardened  base  should  be  struck  off  and  compacted  by 
rolling  or  with  tampers  or  vibrators.  The  surface  should  be  finished  to  the  desired 
smoothness  with  a  wood  float  and  steel  trowel,  or  with  a  mechanical  float  machine  and 
steel  trowel. 

715.  Curing 

As  soon  as  the  finished  wearing  course  has  hardened  sufficiently  to  prevent  marring 
it  should  be  sprinkled  with  water  or  covered  with  sand  or  other  approved  coverings 
and  kept  continuously  wet  for  at  least  10  days  where  normal  Portland  cement  is  used, 
or  three  days  where  high  early  strength  Portland  cement  is  used. 

Terrazzo 

716.  Methods  of  Bonding 

Terrazzo  finish  should  be  bonded  to  the  structural  concrete  base  following  Method  1, 
or  separated  from  the  concrete  base  or  supporting  surface  following  Method  2. 

Terrazzo  Method  1 

717.  Treatment  of  Base 

The  surface  of  the  structural  concrete  base  or  fill  course  upon  which  terrazzo  is  to  be 
placed  should  be  at  least  two  inches  below  the  finished  floor  level.  The  base  course 
should,  be  cleaned  of  all  loose  and  foreign  materials,  thoroughly  wetted  and  a  thin  coat 


Terrazzo    Finishes  67 


of  neat  cement  broomed  into  the  surface  for  a  short  distance  ahead  of  the  placing  of 
the  mortar  base. 

718.  Mortar  Base  Course 

Upon  the  concrete  base  should  be  placed  a  mortar  base  course  at  least  1%  in. 
thick,  with  the  surface  struck  off  at  least  ^  in.  below  the  finished  floor  level.  The 
mortar  base  should  be  composed  of  one  part  Portland  cement  to  not  more  than  four 
parts  sand  and  sufficient  water  to  produce  a  mortar  of  the  stiffest  consistency  that  can 
be  struck  off  cleanly  with  a  straight  edge. 

719.  Metal  Strips 

Metal  dividing  strips  of  the  type  and  width  desired  and  at  least  20  gage  in  thick- 
ness should  be  inserted  in  the  mortar  base  before  it  hardens  and  should  be  so  posi- 
tioned as  to  control  the  location  of  cracks  and  conform  to  the  design  or  pattern  required. 
The  tops  of  the  metal  cUviding  strips  should  extend  at  least  ^  of  an  inch  above  the 
finished  level  of  the  floor. 

720.  Terrazzo  Mix 

The  terrazzo  mixture  should  consist  of  one  part  gray,  white,  or  colored  Portland 
cement,  as  desired,  to  not  more  than  two  parts  by  weight  of  marble  chips,  stone  chips, 
or  abrasive  aggregate,  or  a  mixture  of  these  of  the  required  grading,  quality  and  color. 
The  consistency  of  the  terrazzo  mixture  should  be  plastic  and  workable;  wet  or  fluid 
mixes  should  be  avoided.  Coloring  agents  other  than  aggregates  should  be  mineral 
pigments. 

721.  Placing 

When  the  mortar  base  has  hardened  sufficiently  to  withstand  rolling,  the  terrazzo 
mixture  should  be  placed  to  the  level  of  the  tops  of  the  metal  dividing  strips.  After 
being  struck  off  the  surface  should  be  rolled  lengthwise  and  crosswise  to  secure  a  thor- 
ough compacting.  Additional  aggregates  of  the  quality,  grachng,  and  color  required 
should  be  spread  over  the  surface  during  the  rolling  until  at  least  70  percent  of  the 
finished  surface  is  composed  of  aggregate.  Immediately  after  rolling  the  surface  should 
be  floated  and  troweled  once  without  attempting  to  remove  trowel  marks. 

722.  Grinding  and  Finishing 

After  the  terrazzo  concrete  has  hardened  sufficiently  to  prevent  dislodgment  of  the 
aggregate  it  should  be  ground  down  by  hand  or  with  an  approved  type  of  grinding 
machine  shod  with  rapid  cutting  carborundum  stone  or  other  abrasive.  The  floor  should 
be  kept  wet  during  the  grinding  process.  All  material  ground  off  should  be  removed  by 
squeegee  and  by  flushing  with  water.  Air  holes  and  other  blemishes  and  imperfections 
should  be  filled  with  a  thin  grout  composed  of  neat  Portland  cement  paste  spread  over 
and  worked  into  the  surface.  After  the  cement  paste  has  hardened  for  at  least  72  hours 
the  floor  surface  should  receive  a  second  or  final  grinding  sufficient  to  remove  the 
film  of  cement  paste. 

723.  Curing 
See  Sec.  715. 

724.  Cleaning 

After  removing  all  loose  material  the  finished  floor  should  be  scrubbed  clean  with 
warm  water  and  soft  soap  and  mopped  dry. 


68 Report    on    Concrete    and    Reinforced    Concrete 

Terrazzo  Method  2 

725.  Sand  and  Paper  Course 

The  surface  of  the  structural  base  or  fill  course  upon  which  the  terrazzo  is  to  be 
placed  should  be  2%  in.  below  the  finished  level  of  the  floor.  Over  this  surface  should 
be  placed  a  layer  of  fine,  dry  sand  about  %  in.  in  thickness.  The  sand  should  be  struck 
off  with  a  straight  edge  to  a  smooth  surface  not  less  than  2  in.  below  the  finished  floor 
level.  The  surface  of  the  sand  should  be  covered  with  waterproofed  paper.  The  paper 
should  be  so  placed  that  all  side  and  end  laps  are  at  least  1  in.  wide. 

726.  Construction 

The  mortar  base  course  should  be  placed  upon  the  paper  and  terrazzo  finish  laid 
as  described  for  Method  1    (Sec.  717  to  724). 

Use  of  Color 

727.  Pigments 

(a)  Quality  of  Colors. — Only  those  pigments  should  be  used  which  are  insoluble  in 
water  and  free  from  acids  and  soluble  salts,  and  which  are  definitely  known  not  to  react 
with  the  calcium  hydroxide  set  free  during  the  hardening  of  the  concrete,  and  which 
are  further  known  through  service  not  to  be  fugitive.  Inorganic  pigments  are  to  be  pre- 
ferred; organic  coloring  agents  should  be  used  only  when  known  to  have  the  above 
characteristics. 

(b)  Limiting  Amounts. — Pigments  having  a  specific  gravity  of  3.0  or  higher  should 
be  used  in  amounts  not  greater  than  10  percent  of  the  weight  of  the  cement.  The  lighter 
weight  pigments  should  be  used  in  lesser  amounts.  When  in  doubt  as  to  the  permissible 
amount  that  should  be  used  for  any  particular  job,  tests  should  be  made  using  all  the 
materials  and  in  the  proportions  indicated  for  the  job,  and  noting  the  appearance  and 
effect  on  the  physical  properties,  particularly  strength  and  volume  change  of  the  concrete. 

(c)  Mixing. — Preferably,  the  pigment  should  be  ground  with  the  cement;  other- 
wise, it  should  be  thoroughly  mixed  dry  with  the  cement  and  fine  aggregate  until  a 
uniform  color  is  secured  throughout. 

728.  Colored  Aggregates 

Colored  aggregates  may  be  used  when  tests  have  shown  that  they  will  produce  a 
concrete  having  the  desired  properties  and  that  the  colors  are  not  fugitive  and  will  not 
react  with  the  calcium  hydroxide  set  free  during  the  hardening  of  the  cement.  Naturally 
occurring  aggregates  and  those  produced  from  crushing  and  sizing  vitrified  ceramic  prod- 
ucts and  colored  glasses  have  generally  proved  satisfactory.  These  aggregates  should  be 
used  as  normal  aggregates. 

Paints 

729.  Classification 

(a)  Paints  commonly  used  for  concrete  may  be  of  three  classes: 

Lead  and  oil  paints.  i 

Cement  and  oil  paints. 
Portland  cement  paints. 

(b)  "Lead  and  Oil  Paints"  is  the  general  term  used  for  paints  based  upon  the  prin- 
ciple of  grinding  a  pigment,  such  as  white  lead,  in  a  vehicle  such  as  linseed  oil  with  the 
addition  of  driers  and  thinners.  Modern  paints  of  this  type  may  be  composed  of  many 
other  pigments  besides  white  lead,  and  other  vehicles  besides  linseed  oil. 


Design 69 

(c)  "Cement  and  Oil  Paints'  is  the  general  term  used  for  paints  made  by  grinding 
Portland  cement  and  pigment  in  an  oil  or  synthetic  resin  vehicle. 

(d)  "Portland  Cement  Paints"  is  the  general  term  for  mixtures  of  Portland  cement 
and  pigment  prepared  for  application  by  mixing  with  water. 

730.  Application  of  Lead  and  Oil  Paints,  Cement  and  Oil  Paints 

(a)  Seasoning  of  Concrete. — A  period  of  eight  to  ten  weeks  following  the  curing 
period  should  be  allowed  for  concrete  to  season  before  painting.  The  alkalinity  of  the 
surface  should  then  be  reduced  by  applying  a  solution  consisting  of  two  to  three  pounds 
of  zinc  sulfate  per  gal.  of  water.  When  thoroughly  dry,  all  crystals  should  be  brushed 
from  the  surface.  This  treatment  is  net  necessary  on  old  concrete  or  stucco. 

(b)  Condition  of  Surface. — The  surface  should  be  clean  and  free  from  dirt,  oil, 
grease,  and  efflorescence,  and  should  be  thoroughly  dry  at  the  time  of  painting.  If  water 
dashed  on  the  surface  from  a  brush  is  rapidly  absorbed,  the  surface  may  be  assumed  to 
be  dry  enough  for  painting. 

(c)  Number  of  Coats. — The  number  of  coats  necessary  will  depend  on  the  porosity 
of  the  surface  and  in  general  should  be  not  less  than  three  on  surfaces  previously 
unpainted.  The  first  coat  should  be  well  thinned  for  penetration.  The  second  coat  should 
contain  more  pigment,  the  amount  depending  on  the  suction  remaining.  The  number  of 
undercoats  should  be  sufficient  so  that  oil  will  not  be  drawn  from  the  finish  coat  and  it 
will  dry  to  a  uniform  gloss  and  color. 

731.  Application  of  Portland  Cement  Paints 

(a)  Condition  of  Surface. — The  surface  should  be  clean  and  free  from  dirt,  oil, 
grease,  and  efflorescence,  and  should  be  uniformly  damp  at  the  time  of  painting.  The 
surface  should  be  dampened  sufficiently  in  advance  so  that  free  water  has  drained  from 
the  surface. 

(b)  Application  and  Curing. — After  the  first  coat  of  paint  has  hardened  sufficiently 
to  prevent  damage  to  the  surface,  it  should  be  moistened  with  water  applied  with  a  fine 
spray  and  a  second  coat  of  paint  applied.  As  soon  as  it  is  possible  to  do  so  without 
marring  the  surface,  the  second  coat  of  paint  should  be  sprayed  with  water  and  the  sur- 
face kept  wet  for  at  least  three  days  to  insure  proper  curing  and  hardening  of  the  paint. 

Chapter  VIII — Design 

801.  General 

(a)  In  presenting  recommendations  for  the  design  of  reinforced  concrete  structures 
the  committee  has  given  consideration  to  such  recent  developments  as  plastic  flow,  or 
time  yield,  in  concrete,  and  the  application  of  the  elastic  frame  theory  in  design.  Con- 
cerning plastic  flow,  the  committee  adopts  the  prevailing  opinion  that  in  flexural  mem- 
bers there  is  an  adjustment  in  the  concrete  and  steel  stresses  of  moderate  amounts,  but 
that  the  load  carrying  capacity  of  the  member  is  not  materially  affected.  In  fact, 
according  to  this  opinion  plastic  flow  may  aid  the  structure  in  producing  a  more 
uniform  stress  distribution  by  yielding  at  heavily  stressed  sections. 

(b)  In  regard  to  the  elastic  frame  theory  the  committee  ^akes  the  position  that  the 
design  of  a  monolithic  frame  as  an  aggregation  of  isolated  members  is  not  tenable. 
Frames  of  buildings  and  other  types  of  structures  are  generally  built  with  the  various 
members  rigidly  connected  with  one  another.  This  feature  of  continuity  of  construction 


70 Report    on    Concrete    and    Reinforced    Concrete 

complicates  the  problem  of  determining  the  character  and  amount  of  bending  at  critical 
sections  of  the  frame. 

(c)  In  the  design  of  buildings  it  has  been  for  many  years  common  practice  to  design 
columns  and  beams  as  isolated  members,  the  columns  as  compression  members  axially 
loaded,  and  the  floor  system  by  prescribed  coefficients  for  moments  at  the  ends  and  in 
the  center  of  the  span.  In  some  cases  prescribed  moment  coefficients  have  also  been 
used  to  evacuate  the  bending  in  columns  induced  by  unbalanced  loadings  from  the  floor 
system. 

(d)  Although  such  practice  has  apparently  resulted  in  safe  design  in  the  case  of 
buildings  with  uniform  column  spacings,  it  has  become  increasingly  clear  with  the  advent 
of  newer  methods  of  analysis  that  the  degree  of  safety  was  neither  uniform  throughout 
the  structure  nor  in  some  cases  equal  to  that  intended  in  the  design.  In  the  rather  fre- 
quent cases  of  unequal  spacing  of  columns  or  story  heights,  the  design  based  on  the 
usual  moment  coefficients  often  leads  to  improper  design,  and  quite  generally  to  wide 
departure  from  uniformity  of  factor  of  safety  in  the  various  members  of  the  structure. 

(e)  The  committee  recognizes  that  more  exact  methods  of  analysis  are  now  avail- 
able for  general  use  in  the  design  of  buildings  and  other  framed  structures,  also  that 
they  may  be  simplified  without  undue  sacrifice  of  accuracy.  These  methods  will  result  in 
better  provision  for  the  effects  due  to  continuity  and  should  thereby  secure  a  more 
uniform  degree  of  safety.  The  need  for  such  improvement  in  design  becomes  more  im- 
portant with  the  introduction  of  higher  strengths  and  lighter  weights  of  concrete  and  the 
accompanying  higher  working  stresses.  The  consideration  of  continuity  is  especially  im- 
portant in  cases  of  unequal  spans  alternately  loaded  where  the  ratio  of  live  to  dead  load 
is  large. 

802.  Assumptions 

The  design  of  reinforced  concrete  frames,  beams,  and  slabs,  is  based  on  the 
following  assumptions: 

1.  Plane  sections  normal  to  the  axis  remain  plane  after  bending. 

2.  Tensile  strength  of  concrete  is  negligible  in  resisting  bending. 

3.  The  ratio  of  the  modulus  of  elasticity  of  steel  to  that  of  concrete,  for  con- 
crete of  a  given  strength,  is  constant  in  flexural  members  within  the  range  of  work- 
ing stresses.  The  ratio,  however,  is  not  considered  as  fixed  in  the  case  of  columns  or 
in  the  case  of  compression  reinforcement  in  flexure  where,  due  to  plastic  flow,  the 
reinforcement  will  be  more  highly  stressed  than  indicated  by  a  constant  value  of  the 
modular  ratio. 

4.  The  moment  of  inertia  of  flexural  members,  for  purposes  of  computing  the 
relative  stiffness,  may  be  that  of  the  gross  cross-sectional  area  of  the  member, 
making  reasonable  allowance  for  the  effect  of  flange  width  in  T-beams  permitted  in 
804(d).  For  columns  or  other  compression  members  the  transformed  area  of  the 
steel  reinforcement  should  be  included. 

5.  Temperature  changes  and  shrinkage  are  neglected  in  the  computation  of 
stresses  for  buildings  of  ordinary  size.  (See  Sec.  510  for  recommendations  regarding 
expansion  joints  and  temperature  reinforcement.) 

6.  In  engineering  structures  such  as  arches,  elastic  frame  bridges,  and  similar 
types  where  temperature  change  is  an  important  factor  in  the  resultant  stressss,  it  is 
assumed  that  the  temperature  change  is  uniformly  distributed  throughout  the  mem- 
ber affected.  For  design  purposes  the  coefficient  for  temperature  change  may  be 
taken  as  0.000006  per  degree  F. 


Design H 

7.  Where  shrinkage  is  considered  a  factor  in  design  it  may  be  assumed  to  range 
from  O.OOOIS  to  000045.  depending  upon  the  size  of  the  member  and  the  moisture 
conditions. 

803.  Superimposed  Loads 

(a)  Uniform  Loads. — It  is  generally  recognized  that  the  conventional  assumption  of 
uniform  load  is  a  device  employed  for  convenience  of  design  and  is  only  an  approxima- 
tion to  floor  loadings  found  in  service.  Uniform  load,  however,  has  been  found  to  cover 
adequately  the  usual  varieties  of  partial  loadings  in  buildings  and  may  be  accepted  unless 
the  loads  are  permanently  fi.xed  in  position.  For  the  usual  building,  the  following  arrange- 
ment of  loaded  spans  for  computing  maximum  positive  and  negative  bending  moments, 
respectively,  is  recommended,  unless  conditions  indicate  a  need  for  more  careful  analysis: 

1.  Alternate  spans  loaded,  with  a  maximum  of  three  loaded  spans. 

2.  Two  adjacent  spans  loaded,  other  spans  unloaded. 

(b)  Moving  Loads. — In  structures  subject  to  moving  loads  the  bending  moments 
and  shears  to  be  used  in  design  should  be  the  maximum  values  which  may  result  from 
any  probable  position  of  the  conventional  or  actual  system  of  loads  to  be  provided  for. 

(c)  Impact. — For  moving  or  other  impact-producing  loads  suitable  allowance  should 
be  made  in  the  various  portions  of  the  structure  for  these  effects.  Such  allowance  should 
take  into  account  the  ratio  of  the  Uve  to  dead  load. 

(d)  Structures  in  Earthquake  Regions. — In  structures  subject  to  earthquake  shocks 
special  analysis  should  be  made  to  determine  the  probable  stresses  which  should  be  added 
to  those  resulting  from  static  or  moving  loads. 

Design  of  Frames,  Beams,  and  One-Way  Slabs 

804.  General 

(a)  Effective  Span  for  Determining  Bending  Moments. — 

1.  In  continuous  beams  and  slabs  or  elastic  frames  the  effective  span  should  be 
taken  as  the  center-to-center  distance  between  supports. 

2.  In  beams  or  slabs  of  one  span  freely  supported,  the  effective  span  length 
should  be  taken  as  the  center-to-center  distance  between  supports,  but  need  not 
exceed  the  clear  span  plus  the  distances  to  centers  of  the  required  bearing  areas. 

3.  In  slabs  built  integrally  with  supports  capable  of  fully  restraining  the  slab 
the  effective  span  length  may  be  taken  as  the  clear  distance  between  supports. 

(b)  Lateral  Support. — If  the  distance  between  lateral  supports  of  beams  exceeds  24 
times  the  least  width  of  the  compression  face,  the  allowable  unit  stress  should  be  re- 
duced. In  no  case  should  the  distance  between  supports  be  more  than  36  times  the  least 
width,  at  which  Umit  the  reduction  in  stress  should  be  50  percent.  Proportionate  reduc- 
tion for  intermediate  ratios  of  span  to  width  should  be  made. 

(c)  Compression  Reinforcement  in  Beams. — Compression  reinforcement  in  girders 
or  beams  should  be  secured  against  buckling  by  ties  or  stirrups  adequately  anchored  in 
the  concrete  and  spaced  not  more  than  16  bar  diameters  apart.  Where  compression  re- 
inforcement is  used  its  effectiveness  in  resisting  bending  may  be  taken  at  twice  the  value 
indicated  from  the  calculations,  assuming  a  straight-line  relation  between  stress  and 
strain  and  the  modular  ratio  given  in  Table  7,  Sec.  878.  However,  in  no  case  should  a 
stress  in  compressive  reinforcement  greater  than  16,000  p.s.i.  be  allowed. 

(d)  T-  and  L-Beams,  Limitations. — 

1.  In  T-  and  L-beam  construction  the  slab  and  beam  should  be  built  integrally 
or  otherwise  effectively  bound  together. 


12  Report    on    Concrete    and    Reinforced    Concrete 

2.  The  effective  flange  width  used  in  the  design  of  T-beams  should  not  exceed 
one-fourth  of  the  span  length  of  the  beam,  nor  should  the  overhanging  width  on 
either  side  of  the  web  exceed  eight  times  the  thickness  of  the  slab  or  one-half  the 
clear  distance  to  the  next  beam. 

3.  For  beams  having  a  flange  on  one  side  only,  the  effective  overhanging  flange 
width  should  not  exceed  one-twelfth  of  the  span  length  of  the  beam,  nor  six  times 
the  thickness  of  the  slab,  nor  one-half  the  clear  distance  to  the  next  beam. 

(e)  Transverse  Reinforcement  in  Flange  of  T-  and  L-Beams. — ^Where  the  principal 
slab  reinforcement  is  parallel  to  the  beam,  transverse  reinforcement  should  be  provided 
in  the  top  of  the  slab.  This  reinforcement  may  be  designed  to  carry  the  load  on  that 
portion  of  the  slab  which  is  assumed  to  act  as  the  flange  of  the  T-beam. 

805.  Bending  Moments  in  Frames 

(a)  In  monolithic  frames  or  continuous  construction  the  members  should  be  designed 
to  resist  the  bending  moments  and  shears  produced  by  the  dead,  live,  and  wind  loads 
in  accordance  with  methods  of  elastic  frame  analysis.  For  special  conditions,  such  as 
centrifugal  force,  impact,  braking  and  tractive  forces  in  railway  loadings,  and  for  earth- 
quakes or  unequal  settlement  of  the  foundations,  etc.,  the  analysis  should  include  the 
effect  of  these  additional  forces. 

(b)  For  unusual  building  frames,  continuous  girder  bridges,  arches,  or  other  types 
of  statically  indeterminate  structures,  rigorous  methods  of  analysis  are  recommended. 

(c)  For  ordinary  building  construction  approximate  methods  of  frame  analysis  are 
satisfactory. 

(d)  Regardless  of  the  method  of  computing  bending  moments,  all  horizontal  mem- 
bers of  the  frame  should  be  designed  to  resist  a  positive  moment  near  the  center  of  the 
span  not  less  than  O.OAwV. 

806.  Bending  Moments  in  One-Way  Slabs  (Solid  or  Ribbed),  Spans  of  Any 
Length  or  Loading 

(a)  Floor  slabs  over  a  series  of  spans  should  be  designed  as  restrained  by  their  con- 
tinuity with  each  other.  Restraint  afforded  by  the  supports  themselves,  unless  approaching 
fixity,  and  except  as  specially  provided  in  (c)  below,  may  be  disregarded.  However,  a 
negative  moment  of  at  least  0.04^;^  per  foot  of  width  should  be  provided  for  in  the  slab 
at  the  discontinuous  end. 

(b)  It  is  recommended  that  bending  moments  be  computed  for  the  following 
arrangement  of  live  load: 

1.  The  maximum  negative  moment  at  the  support  for  two  adjacent  spans 
loaded. 

2.  The  maximum  positive  moment  near  the  middle  of  a  loaded  span  when 
adjacent  spans  are  not  loaded. 

3.  The  resultant  moment  (positive  or  negative)  near  the  middle  of  an 
unloaded  span  when  adjacent  spans  are  loaded. 

(c)  In  computing  the  bending  moment  near  the  middle  of  unloaded  spans,  in 
accordance  with  (b)  3  above,  the  torsional  resistance  of  the  supporting  beam  may  be 
considered  to  restrain  the  rotation  of  the  support  to  the  extent  that  adjacent  spans  may 
be  assumed  loaded  with  only  one-half  their  specified  live  load. 

(d)  For  proportioning  the  sections  of  slabs  or  ribs  the  negative  bending  moments 
may  be  computed  at  the  face  of  the  supports. 


Design 73 

(e)  In  Appendix  2  is  given  a  general  method  for  computing  moments  at  the  center 
of  the  supports  which  can  be  applied  to  the  assumptions  of  this  section.  The  positive 
moments  at  mid-span  can  be  obtained  by  the  ordinary  methods  of  statics,  but  the 
resisting  moment  provided  should  not  be  less  than  required  by  805  fdj. 

807.  Bending  Moments  in  One- Way  Slabs  (Solid  or  Ribbed)  of  Equal  Spans 
(a)  For  the  special  case  of  equal  span  lengths,  equal  stiffness,  and  uniform  loading, 

the  requirements  in  Sec.  ZO(i(a),(b),  and  (c)  are  substantially  fulfilled  by  the  coefficients 
given  in  Appendix  3. 

808.  Bending  Moments  in  Beams  and  Girders 

(a)  The  positive  and  negative  bending  moments  in  beams  and  girders  designed  to  be 
built  monoUthically  with  columns,  beams,  or  walls,  should  be  computed  in  accordance 
with  the  theory  of  elastic  frames. 

(b)  In  building  construction,  horizontal  members  of  the  frame  should  be  designed 
as  being  restrained  by  their  continuity  with  each  other  and  by  supporting  and  other 
members  connecting  at  the  joints.  Where  no  great  irregularities  of  span,  story-height, 
or  loading  are  involved  the  general  method  given  in  Appendix  2  may  be  used  for  com- 
puting the  moment  at  the  centerline  of  supports.  In  the  case  of  beams  framing  into  a 
girder,  the  restraint  due  to  the  torsional  resistance  afforded  by  the  girder  may  be  assumed 
as  equal  to  that  which  would  be  furnished  by  a  column  having  a  stiffness  factor  equal 
to  one-half  the  average  stiffness  factor  of  the  beams  framing  into  the  girder. 

(c)  Bending  moments  should  be  computed  for  the  arrangement  of  live  load 
recommended  in  Sec.  SQZ(a). 

(d)  The  moment  at  the  face  of  a  support  may  be  used  for  proportioning  the  mem- 
ber. This  moment  may  be  obtained  approximately  from  the  moment  at  the  centerline 
by  subtracting  a  quantity  Fa/3,  where  V  is  the  shear  at  the  face  of  the  support  and  a  is 
the  width  of  the  support. 

(e)  Positive  moments  may  be  computed  by  the  ordinary  methods  of  statics,  but 
the  resisting  moment  provided  should  not  be  less  than  O.OAwt^. 

Two-Way  Slabs  with  Supports  on  Four  Sides 

809.  General 

(a)  These  recommendations  are  intended  to  apply  to  slabs  (sohd  or  ribbed) ,  isolated 
or  continuous,  supported  on  all  four  sides  by  walls  or  beams,  in  either  case  built  mono- 
Uthically with  the  slabs.  The  recommended  coefficients,  as  in  the  case  of  the  design 
provisions  for  fiat  slabs,  are  based  partly  on  analysis  and  partly  on  test  data.*  The 
analysis  indicates  that  for  square  panels  the  moments  may  be  substantially  less  than 
those  determined  on  the  basis  of  independent  prismatic  beam  elements.  Similar  decrease 
is  considered  to  hold  for  other  than  square  panels  but  at  reducing  percentages  until  a 
ratio  of  short  to  long  span  of  0.5  is  reached.  For  this  and  all  lesser  ratios  the  entire 
distributed  load  (except  that  in  the  column  strips)  is  assumed  to  be  carried  in  the  short 
direction  of  the  panel.  Available  test  data  indicate  that  these  assumptions  are  justified. 

(b)  Available  data  also  indicate  that  when  two-way  slabs  are  cast  monolithically 
with  supporting  beams,  the  distribution  and  the  numerical  values  for  bending  moments 
in  slabs  with  one  or  more  discontinuous  edges  do  not  differ  widely  from  those  of  in- 


*  In  general,  the  coefficients  and  methods  given  in  these  recommendations  are  based  upon  the  co- 
efficients proposed  by  Dr.  H.  M.  Westergaard  (Formulas  for  the  design  of  rectangular  floor  slabs  and 
supporting  girders,  p.  26,  Proceedings  of  the  American  Concrete  Institute  for  1926).  Some  modifica- 
tions of  these  coefficients  have  been  made  and  the  scries  extended  to  include  cases  not  covered  by  Dr. 
Westergaard.  In  making  these  modifications  and  extensions  full  consideration  has  been  given  to  the 
results  of  available  test  data. 


74  Report    on    Concrete    and    Reinforced    Concrete 

terior  panels.  However,  these  data  are  rather  limited,  but  the  moment  coefficients  rec- 
ommended in  Table  S  for  the  slabs  with  discontinuous  edges  are  conservative  and  in 
general  agreement  with  accepted  theoretical  considerations  and  general  practice. 

(c)  In  the  special  case  of  slabs  discontinuous  at  four  edges  (isolated  panels,  case  S, 
Table  5),  the  coefficients  may  be  assumed  to  apply  also  to  slabs  which  are  built  into 
masonry  walls,  provided  the  weight  of  masonry  above  the  slab  is  sufficient  to  restrain 
the  slab  properly  at  the  edges.  The  average  parapet  wall  is  probably  lacking  in  this 
respect. 

810.  Limitations  and  Notations 

(a)  The  recommended  moment  coefficients  in  Table  S,  Sec.  811,  are  intended  to 
apply  to  panels  fully  loaded  with  a  uniformly  distributed  load.  For  values  of  m  inter- 
mediate between  those  shown  in  Table  S,  interpolated  values  of  the  moment  coefficients 
may  be  used.  For  values  of  m  less  than  O.S  the  coefficients  given  for  this  ratio  should 
be  used. 

(b)  Panels  are  considered  as  being  divided  into  middle  strips  and  column  strips  as 
in  flat  slabs.  (See  Sec.  824(a)).  For  panels  in  which  the  ratio  m  is  less  than  O.S  the 
middle  strip  in  the  short  direction  of  the  panel  should  have  a  width  equal  to  the  differ- 
ence between  the  long  and  short  spans,  the  remaining  area  representing  the  two  column 
strips. 

(c)  Notation. — Span  lengths  of  panels  should  be  taken  as  the  center-to-center  dis- 
tance between  supports  or  as  the  clear  span  plus  twice  the  thickness  of  the  slabs, 
whichever  value  is  the  smaller. 

S  =  short  span  as  defined  above 

.      short  span 

''^  —  ratio  ~i 

long  span 

w  =  load  per  unit  area 

(d)  Principal  Design  Sections. — The  critical  sections  for  moment  calculations  are 
referred  to  as  principal  design  sections  and  are  located  as  follows: 

For  negative  moment,  along  the  edges  of  the  panel  at  the  faces  of  the  sup- 
porting beams. 

For  positive  moment,  along  the  center  lines  of  the  panels. 

811.  Bending  Moment  Coefficients 

(a)  Middle  Strips.— In  Table  S  are  given  the  bending  moment  coefficients  for  the 
middle  strips  for  both  short  and  long  spans  for  varying  values  of  the  ratio  m  of  short 
to  long  span.  These  coefficients,  when  multiplied  by  wS^  give  the  bending  moment  per 
unit  width  of  slab.  The  basis  of  this  table  is  a  maximum  negative  moment  of  0.0.33  wS^ 
per  unit  width  in  the  middle  strip  for  square  interior  panels.  The  coefficients  for  other 
than  square  panels  and  for  panels  with  one  or  more  edges  discontinuous  are  based  on 
the  following  modifications  of  this  basic  moment  for  the  square  interior  panel: 

1.  Bending  moments  in  the  short  span  increase  as  the  ratio  m  decreases. 

2.  Bending  moments  in  the  short  span  increase  successively  with  the  introduc- 
tion of  one  or  more  discontinuous  edges,  the  increase  being  independent  of  the 
position  of  the  discontinuous  edges. 

3.  Bending  moments  for  the  long  span  for  all  values  of  m  are  equal  to  the 
bending  moments  in  a  square  panel  having  sides  equal  to  the  short  span. 

4.  Negative  moments  at  discontinuous  edges  are  taken  as  equal  to  one-half 
of  the  corresponding  moment  at  the  continuous  edge. 

5.  Positive  moments  at  the  center  are  taken  as  three-quarters  of  the  negative 
niomont  at  the  continuous  edge. 


Design 


75 


(b)  Column  Strips. — For  moments  in  the  column  strips,  coefficients  two-thirds  of 
those  given  in  Table  5  for  the  corresponding  moments  in  the  middle  strip  should  be 
used.  In  determining  the  spacing  of  the  reinforcement  for  the  column  strip,  the  moment 
at  any  section  may  be  assumed  to  vary  from  a  maximum  at  the  edge  of  the  middle  strip 
to  a  minimum  at  the  edge  of  the  panel,  but  the  average  should  be  that  computed  from 
the  coefficient  as  given  herein. 

Table  S — Bending  Moment  Coefficients  for  Rectangular  Panels  Supported  on 
Four  Sides  and  Built  Monolithically  With  Supports 

Coefficients  are  for  moments  in  middle  strips. 


Short  Span 

Long 

Moments 

Values  of  m 

Span 
All 

1.0 

0.9 

o.s 

0.7 

0.6 

0.) 

and 
less 

Values 
of  m 

Case  1 — Interior  Panels 

Negative  Moment  at 

Continuous  edge 

.  033 

.040 

.048 

.055 

.063 

.083 

.033 

Discontinuous  edge 

Positive  Moment  at  Midspan 

.025 

.030 

.036 

.oii 

.047 

.062 

.025 

Case  2 — One  Edge  Discontinuous 

Negative  Moment  at 

Continuous  edge 

.041 

.048 

.055 

.062 

.069 

.085 

.041 

Discontinuous  edge 

.021 

.024 

.027 

.031 

.035 

.042 

.021 

Positive  Moment  at  Midspan 

.031 

.036 

.041 

.047 

.052 

.064 

.031 

Case  3 — Two  Edges  Discontinue 

us 

Negative  Moment  at 

Continuous  edge 

.049 

.057 

.064 

.071 

.078 

.090 

.049 

Discontinuous  edge.    . 

.025 

.028 

.032 

.036 

.039 

.045 

.025 

Positive  Moment  at  Midspan 

.037 

.043 

.048 

.054 

.059 

.068 

.037 

Case  4 — Three  Edges  Discontinu 

ous 

Negative  Moment  at 

Continuous  edge 

.058 

.066 

.074 

.082 

.090 

.098 

.058 

Discontinuous  edge 

.029 

.033 

.037 

.041 

.045 

.049 

.029 

Positive  Moment  at  Midspan 

.044 

.050 

.056 

.062 

.068 

.074 

.044 

Case  5 — Four  Edges  Discontinue 

us 

Negative  Moment  at 

Continuous  edge 









Discontinuous  edge 

.033 

.038 

.043 

.047 

.053 

.055 

.033 

Positive  Moment  at  Midspan 

.050 

.057 

.064 

.072 

.080 

.083 

.050 

These  coefficients,  when  multiplied  by  wS^,  give  the  moment  per  foot  of  width,  w  ^  load  per  sq.  ft.; 
:  short  span  as  defined  in  Sec.  &\0(c). 
Note  that  wS^  is  the  multiplier  for  both  short  and  long  span   moments. 


(c)  Corner  Reinforcement. — Experience  and  theoretical  considerations  have  shown 
the  need  for  reinforcement  at  exterior  corners  to  prevent  cracks  in  diagonal  directions. 
The  effective  amount  of  such  reinforcement  per  foot  of  width  should  be  equal  to  that 
for  the  positive  moment  in  the  middle  strip.  This  is  required  in  both  the  top  and  bottom 
face  of  the  slab.  By  the  effective  amount  of  the  steel  is  meant  the  normal  area  multiplied 
by  the  sine  of  (he  angle  which  the  bar  makes  with  the  rritiral  section.  In  the  lop  of  the 


76 Report    on    Concrete    and    Reinforced    Concrete     

slab  the  critical  section  is  perpendicular  to  the  diagonal ;  in  the  bottom  of  the  slab  it  is 
parallel  to  the  diagonal. 

812.  Distribution  of  Unequal  Negative  Moments  at  Supports 

(a)  In  applying  the  moment  coefficients  of  Table  S  to  adjacent  panels  of  varying 
dimensions  and  unequal  loading,  the  negative  moments  on  either  side  of  a  supporting 
beam  may  differ  materially.  Under  these  conditions  some  modification  of  the  moments 
should  be  made,  based  on  the  relative  rigidity  of  the  slabs  and  the  resistance  offered  by 
the  support.  For  this  purpose  the  assumption  that  the  supporting  beams  offer  a  restraint 
equivalent  to  the  average  of  the  stiffness  factors  of  the  adjacent  slabs  may  be  used  in  a 
manner  similar  to  that  given  in  Sec.  SQ8(b)  for  beams  framing  into  girders.  On  this 
basis  two-thirds  of  the  unbalanced  negative  moment  should  be  distributed  to  the  two 
spans  in  proportion  to   their  respective  stiffness  factors. 

(b)  Where  conditions  are  such  as  to  require  modification  of  the  support  moments, 
as  given  in  (a)  above,  the  corresponding  midspan  moments  may  be  obtained  by  the  pro- 
cedure ordinarily  followed  for  continuous  beams.  For  this  purpose,  the  unadjusted  nega- 
tive moments  obtained  from  Table  5,  considered  as  equivalent  to  fixed  end  moments, 
may  be  multiphed  by  l]4  to  obtain  the  simple  span  moments.  The  midspan  moment 
then  would  be  equal  to  the  average  adjusted  end  moments  less  1^4  times  the  unadjusted 
end  moments.  The  coefficients  in  Table  5  for  positive  moments  at  midspan  are  suffi- 
ciently conservative  to  cover  ordinary  cases.  However,  where  large  adjustment  of  the 
support  moments  is  required,  the  midspan  moments  should  be  investigated. 

813.  Shear  in  Slabs 

The  shearing  stresses  in  the  slab  should  be  computed  on  the  assumption  that  the  load 
is  distributed  to  the  supporting  beams  in  accordance  with  Sec.  SlS. 

814.  Minimum  Slab  Thickness 

The  slab  thickness  should  not  be  less  than  4  inches,  nor  less  than  the  value  com- 
puted by  the  following  formula: 

'2500 


L  ^  m     10J72  r   f'c 


Where  t  =^  Slab  thickness  in  inches 

S  (in  inches)  and  m  as  in  Sec.  &10(c) 

N  =:  Total  length  in  inches  of  slab  periphery  which  is  continuous  with  adjacent 
slabs. 

815.  Loads  and  Bending  Moments  in  Supporting  Beams 

(a)  Distribution  of  Load.- — The  loads  on  the  supporting  beams  for  a  two-way  rec- 
tangular panel  may  be  assumed  as  the  uniformly  distributed  load  within  the  tributary 
areas  of  the  panel  bounded  by  the  intersection  of  45  deg.  lines  from  the  corners  with 
the  median  line  of  the  panel  parallel  to  the  long  side. 

(b)  Total  Load  and  Shear. — On  the  basis  of  the  load  distribution  in  (a)  above,  the 
total  loads  on  the  short  and  long  span  beams  due  to  one  loaded  panel  are  given  by  the 
following  formulas,  respectively. 

4 


Wb  = 


W^^wST2-ml 
4    L     "i      J 


Diagonal    Tension    and    Shear 77 

The  end  shears  may  be  obtained  from  the  above  loads  by  the  usual  modifications 
cf  the  reactions  for  any  difference  in  end  moments. 

(c)  Bending  Moments. — The  bending  moments  may  be  obtained  for  the  load  dis- 
tribution assumed  by  the  methods  of  mechanics  appropriate  to  the  conditions  of  sup- 
port, or  they  may  be  determined  approximately  by  transforming  the  load  on  the  beams 
•to  equivalent  uniform  load  per  lineal  foot  of  beam  as  follows: 

For  the  short  span,  =  -^^ 
3 


nflj  \  \       7    "fit         I 

For  the  long  span,  = 

Diagonal  Tension  and  Shear 


816.  General 

(a)  For  homogeneous  beams  the  diagonal  tensile  stress  is  given  by  vv^ell-known  for- 
mulas as  a  combined  stress.  This  stress  is  a  function  of  the  shearing  and  the  flexural 
stress  at  any  point  in  the  beam.  Where  the  flexural  stress  is  zero,  as  for  example,  at  the 
neutral  surface,  at  points  cf  inflection,  or  at  the  supports  of  simple  beams,  the  diagonal 
tensile  stress  is  equal  to  the  shearing  stress  and  is  inclined  at  an  angle  of  45  deg.  with 
the  neutral  surface. 

(b)  Because  of  the  composite  character  of  reinforced  concrete  beams  the  action  of 
reinforcement  in  resisting  diagonal  tension  is  not  susceptible  of  exact  analysis.  The  design 
of  web  reinforcement  is  therefore  based  on  empirical  or  modified  rational  methods. 
These  methods  were  developed  by  observation  of  existing  structures  and  from  test  results 
that  do  not  apply  with  certainty  to  new  and  untested  arrangements  of  reinforcement. 

(c)  However,  when  ordinary  web  reinforcement  is  used,  such  as  vertical  stirrups, 
bent-up  longitudinal  bars,  or  the  combination  of  these,  the  resistance  to  diagonal  tension 
or  shear  is  greatly  increased.  This  is  especially  true  if  adequate  bond  resistance  is  pro- 
vided, either  in  the  form  of  low  bond  stress  or  effective  anchorage  of  the  reinforcement. 
The  importance  of  bond  resistance  is  such  that  high  working  stresses  in  shear  are  only 
permitted  when  all  the  reinforcement  is  properly  anchored. 

(d)  In  view  of  available  data  the  following  assumptions  are  recommended  as  a 
proper  basis  for  design. 

1.  The  vertical  shear  is  a  measure  of  diagonal  tension  in  the  web  of  beams. 

2.  The  effectiveness  of  web  reinforcement  is  measured  by  its  projection  on  a 
plane  inclined  at  45  deg.  with  the  neutral  surface. 

3.  Web  reinforcement  provides  for  the  shear  in  excess  of  that  permitted  in  beams 
with  longitudinal  reinforcement  only. 

817.  Shear  and  Diagonal  Tension  in  Beams 

(a)  Beams  (including  ribs  and  other  members  subject  to  bending)  should  be  de- 
signed to  resist  the  diagonal  tension  in  their  webs  without  exceeding  the  stresses  prescribed 
in  Sec.  878.  The  critical  section  for  diagonal  tension  should  be  taken  at  the  face  of  the 
supports. 

(b)  For  purposes  of  design,  diagonal  tension  is  assumed  to  be  directed  at  an  angle 
of  45  deg.  with  the  axis  of  the  beam,  and  its  intensity  is  measured  by  the  unit  shear  as 
computed  by  the  formula: 

''^W (1) 

Where  V  =  total  external  vertical  shear  at  the  section 
jd  =  moment  arm  of  the  internal  force  couple 
b  =■  width  of  the  beam 


78 Report    on    Concrete   and    Reinforced    Concrete 

For  beams  of  I-  or  T-section,  b  is  the  width  of  the  concrete  web  or  stem.  In  case 
the  sides  of  the  web  are  not  parallel  the  average  width  may  be  used,  provided  it  does 
not  exceed  the  minimum  width  by  more  than  20  percent. 

(c)  In  ribbed  tile  construction  where  fillers  are  used  consisting  of  burned  clay  or 
concrete  tile  having  a  net  compressive  strength  in  the  shells  at  least  equal  to  that  of  the 
concrete  in  the  ribs,  and  so  placed  that  the  joints  in  alternate  rows  are  staggered,  the 
shells  of  the  fillers  in  contact  with  the  ribs  may  be  used  in  computing  the  shearing 
stress  at  any  section  of  the  rib. 

(d)  Where  the  shearing  stress  as  computed  by  Formula  (1)  exceeds  the  stress  (vv) 
permitted  for  an  unreinforced  web  (Sec.  878),  web  reinforcement  should  be  provided  at 
all  sections  for  the  amount  of  shear  exceeding  that  allowed  for  webs  without 
reinforcement. 

(e)  Where  the  shearing  stress  exceeds  0.06/[.  the  web  reinforcement  should  be 
designed  to  carry  the  entire  shear. 

818.  Types  of  Web  Reinforcement  in  Beams 

Web  reinforcement  may  consist  of  vertical  or  inclined  stirrups  and  bent-up  longi- 
tudinal reinforcement  or  combinations  thereof.  Bars  inclined  at  an  angle  less  than  IS  deg. 
with  the  axis  of  the  beam  shall  not  be  considered  as  web  reinforcement.  When  v  exceeds 
0.06/'c  bent-up  bars  or  inclined  stirrups  should  be  provided  in  addition  to  vertical 
stirrups. 

819.  Design  of  Web  Reinforcement  in  Beams 

(a)  Web  reinforcement  is  considered  effective  only  when  anchored  at  both  ends 
according  to  Sec.  828  and  830. 

(b)  Web  reinforcement,  whether  vertical  or  inclined,  is  assumed  to  contribute  to 
diagonal  tensile  resistance  only  the  component  of  its  total  resistance  that  lies  in  a 
direction  of  45  deg.  with  the  axis  of  the  beam. 

The  stirrup  spacing  (or  length  of  beam  over  which  the  bar  is  effective)  is  given 
by  the  formula: 

_   Avfsjd  {cos  X  -\-  sin  x)  ._. 

^  V'  ^  ' 

wherein :    s  =^  the  horizontal  distance  along  the  axis  of  the  beam  between  bars ; 
X  ^  the  angle  the  bars  make  with  the  axis  of  the  beam ; 

i4v  =  the  total  normal  cross-sectional  area  of  web  reinforcement  in  any  plane ; 
V  =  the  total  external  vertical  shear  in  excess  of  that  allocated  to  the  unre- 
inforced web  according  to  Sec.  817(d)  and  (e). 

For  vertical  stirrups  this  becomes: 
.  _  A.fsjd 


I 


(3) 


and  for  stirrups  or  bars  inclined  at  45  deg.: 


0.7  F' 


(4) 


wherein  /s  -^  16,000  p.s.i.  or  less,  regardless  of  the  grade  of  steel  used.  Where  bars  are 
bent  up  in  a  single  plane  the  effective  length  (s)  as  given  by  Formula  (2)  is  to  be 
measured,  one-half  each  way  from  the  bar  at  the  mid-depth  of  the  beam  and  should 
not  exceed  %d. 

(c)  Web  reinforcement  should  be  so  spaced  that  every  45  deg.  line  extending  from 
the  mid-depth  of  the  beam  (downward  and  towards  the  nearest  support)   to  the  longi- 


Bond    and    Anchorage  79 


tudinal  tension  bars  should  be  intersected  by  at  least  one  line  of  web  reinforcement.  If 
the  shearing  stress  exceeds  0.06/',  every  such  line  should  be  intersected  by  at  least  two 
such  lines  of  web  reinforcement. 

(d)  Where  more  than  one  type  of  reinforcement  is  used  to  reinforce  the  same  portion 
of  the  web,  the  total  shearing  resistance  of  this  portion  of  the  web  is  assumed  to  be  the 
sum  of  the  shearing  resistances  computed  for  the  various  types  separately. 

820.  Shear  and  Diagonal  Tension  in  Flat  Slabs 

(a)  The  shearing  stress  on  a  vertical  section  which  lies  at  a  distance  equal  to  the 
effective  depth  of  the  slab  beyond  the  edge  of  the  column  capital  (or  bracket)  and 
parallel  or  concentric  with  it,  should  not  exceed  the  following  values  when  computed 
by  Formula  (1): 

1.  0.03/e  when  at  least  SO  percent  of  the  total  negative  reinforcement  of  the 
column  strip  passes  through  the  section, 

2.  0.025/'.  when  25  percent  of  the  total  negative  reinforcement  of  the  column 
strip  passes  through  the  section, 

3.  For  intermediate  percentages,  proportional  values  of  the  shearing  stress  may 
be  used. 

(h)  The  shearing  stress  on  a  vertical  section  which  lies  at  a  distance  equal  to  the 
effective  depth  of  the  slab  beyond  the  edge  of  the  drop  panel  and  parallel  with  it  should 
not  exceed  0.03/'  when  computed  by  Formula  (1).  At  least  SO  percent  of  the  cross- 
sectional  area  of  the  negative  reinforcement  in  the  column  strip  should  be  placed  within 
the  strip  directly  above  the  drop  panel.   (See  Sec.  843.) 

821.  Shear  and  Diagonal  Tension  in  Footings 

(a)  The  shearing  stress  as  computed  by  Formula  (1)  on  the  critical  sections  (as 
defined  in  Sec.  866fcJ  and  (d))  should  not  exceed  0.02/c  for  footings  reinforced  with 
straight  bars  only,  nor  0.03/c  where  the  reinforcement  is  adequately  anchored  by  hooks 
or  otherwise  as  described  in  Sec.  827  and  828. 

(b)  For  combined  footings  and  raft  foundations  the  shearing  stresses  and  web  re- 
inforcement for  beam  elements  may  be  treated  the  same  as  for  flexural  members 
described  in  Sec.  818  and  819  except  that  the  shearing  stress  should  not  exceed  0.06/^, 

822.  Wedge-Shaped  Beams 

In  beams  of  variable  depth  the  resultant  internal  shear  at  any  section  is  increased 
or  decreased  by  the  vertical  components  of  the  inclined  stresses  (tension  or  compression) 
as  described  in  Sec.  825. 

Bond  and  Anchorage 

823.  General 

(a)  The  theory  of  reinforced  concrete  is  based  on  the  assumption  that  stress  is 
transmitted  from  one  material  to  the  other  by  bond.  Consequently,  all  members  of  the 
structure  should  be  so  designed  that  stress  transfer  is  accomplished  without  exceeding 
recommended  allowable  bond  values. 

(b)  In  members  subject  to  direct  stress,  also  in  end  anchorage  of  flexural  rein- 
forcement, the  bond  stress  is  assumed  to  be  uniformly  distributed  over  the  embedded 
surface  of  the  bar. 

(c)  In  members  subject  to  bending,  the  bond  stress  varies  in  proportion  to  the 
amount  of  external  shear  and  is  generally  a  maximum  in  the  region  near  the  supports. 


80  Report    on    Concrete    and    Reinforced    Concrete 

In  order  to  maintain  normal  beam  action  and  structural  integrity  of  the  member,  slip- 
ping or  appreciable  movement  of  the  reinforcement  must  be  prevented.  End  anchorage  is 
effective  in  increasing  resistance  to  slipping  and  therefore  serves  as  an  added  factor  of 
safety  against  failure  by  diagonal  tension. 

824.  Bond  Stresses  in  Beams  of  Uniform  Depth 

(a)  In  beams  in  which  tensile  reinforcement  is  parallel  to  the  compressive  face,  that 
is,  excluding  wedge-shaped  beams,  the  bond  stress,  ii,  is  given  by  the  formula*; 

u——^ (5) 

Wherein  ^o  =  the  sum  of  the  perimeters  of  all  the  bars  at  the  section,  and 
V  and  jd  are  as  in  Sec.  817(b). 

(b)  In  applying  Formula  (S)  to  any  section  of  a  beam  in  which  the  reinforcement 
includes  bent  bars,  those  portions  of  bars  which  are  within  a  distance  of  one-third  the 
effective  depth  of  the  beam  from  the  main  longitudinal  reinforcement  may  be  counted 
as  contributing  to  bond  resistance. 

825.  Wedge-Shaped  Beams 

(a)  In  beams  of  variable  depth  the  resultant  internal  shear  at  any  section  is  in- 
creased or  decreased  by  the  vertical  components  of  the  incUned  stresses  (tension  or  com- 
pression) depending  on  whether  they  agree  or  are  opposite  in  sign  to  the  direction  of  the 
external  shear.  The  bond  stress  is  obtained  by  substituting  for  V  in  Formula  (5)  the 
value  Fi,  given  by  the  following  formula: 

Fi=F±— (iaw  c-H  tan  t) (Sa) 

d 

The  negative  sign  to  be  used  when  the  depth  of  the  beam  increases  in  the  direction  of 
increasing  bending  moment  and  the  positive  sign  when  the  depth  decreases  as  the  moment 
increases. 

Wherein  M  =  bending  moment ; 

d  =  depth  of  beam  at  the  section ;  and 
c  and  t  =  the  angles,  respectively,  that  beam  faces  make  with  a  direction  normal  to 
the  direction  of  the  external  shear. 

(b)  In  beams  of  this  type  including  sloped  footings,  tapered  brackets,  and  cantilever 
beams,  bond  stresses  may  be  excessive.  This  is  particularly  true  of  tapered  cantilever 
beams  loaded  at  the  unsupported  end.  These  and  similar  cases  may  require  end  anchorage. 

826.  End  Anchorage  of  Reinforcement 

(a)  In  beams  where  the  bond  stress  as  computed  by  Formula  (S)  exceeds  the  allow- 
able normal  working  stress,  the  use  of  end  anchorage  permits  some  form  of  redistribution 
of  stress  to  take  place.  Without  attempting  to  rationalize  the  precise  character  and  action 
of  anchorage,  reliance  is  placed  on  tests  which  indicate  that  end  anchorage  is  equivalent 
to  increased  bond  resistance.  Consequently,  with  effective  end  anchorage  a  somewhat 
higher  bond  stress  may  be  allowed  than  is  permitted  for  unanchored  reinforcement. 

(b)  Since  resistance  to  diagonal  tension  failure  is  primarily  a  function  of  bond 
resistance,  increased  shearing  stresses  are  also  permissible  when  special  precautions  are 
taken  to  prevent  slipping  of  the  reinforcement. 


*  It  is  recognized  that  when  end  anchorage  is  used  the  assumptions  upon  which  Formula  (5)  arc 
based  may  not  strictly  apply.  However,  the  committee  belie\'es  that  the  use  of  Formula  (5)  with  the 
higher  allowalsle  bond  stresses  permitted  in  Sec.  82  7   for  end  anchorage  is  amply  supported  by   test  data. 


Bond    and    Anchorage 8£ 

827.  Unit  Stresses  with  End  Anchorage  for  Beams 

The  increased  shearing  and  bond  stresses  recommended  in  Sec.  878  are  based  on  the 
use  of  end  anchorage,  in  accordance  with  Sec.  828,  in  addition  to  the  ordinary  extension 
requirements  outlined  in  Sec.  829.  Where  these  higher  stresses  are  used  all  of  the  longi- 
tudinal bars  should  be  provided  with  end  anchorage,  except  those  which  are  bent  across 
the  web  at  an  angle  not  less  than  15  deg.  with  the  neutral  plane  and  made  continuous 
with  the  reinforcement  along  the  opposite  face  of  the  beam. 

828.  Allowable  Capacity  of  End  Anchorage — Hooks 

Anchorage,  transmitting  direct  stress,  tension  or  compression,  within  the  limits  of 
allowable  normal  bond  stress  is  assumed  to  provide  for  the  full  working  stress  in  the  bar 
by  uniform  distribution  of  bond  stress  over  the  embedded  surface.  End  anchorage,  how- 
ever, being  a  device  to  provide  for  increased  bond  and  shearing  stress  should  be  limited 
to  some  definite  amount.  It  is  recommended  that  end  anchorage  be  assumed  to  develop 
a  maximum  stress  of  10,000  lb.  per  sq.  in.  in  the  bar  so  anchored.  End  anchorage  may  be 
an  extension  of  the  bar  or  a  hook.  In  either  case  the  additional  length  of  bar  should  pro- 
vide the  needed  anchorage  by  normal  bond  stress,  assumed  to  be  uniformly  distributed 
over  the  additional  embedded  surface.  A  properly  dimensioned  hook  is  one  in  which  the 
bar  is  bent  in  a  full  semicircle,  with  a  radius  of  bend  not  less  than  three  diameters,  plus 
an  extension  at  the  free  end  of  at  least  four  bar  diameters.  Right  angle  or  other  abrupt 
bends,  which  do  not  engage  a  structural  steel  member,  are  not  to  be  considered  as 
anchorage  unless  the  radius  of  the  bend  is  at  least  4  bar  diameters  and  the  total  length 
from  beginning  of  bend  to  the  free  end  of  the  bar  is  at  least  16  bar  diameters. 

829.  Extension  of  Reinforcement 

(a)  To  provide  for  contingencies  arising  from  unanticipated  distribution  of  loads, 
yielding  of  supports,  shifting  of  points  of  inflection,  or  other  lack  of  agreement  with 
assumed  conditions  governing  the  design  of  elastic  structures,  it  is  recommended  that  the 
reinforcement  be  extended  at  the  supports  and  at  other  points  between  the  supports  as 
indicated  in  (b)  to  (f)  below.  These  paragraphs  relate  to  ordinary  anchorage  and  are 
the  minimum  requirements  under  which  normal  working  stresses  for  bond  or  shear  are 
permitted. 

(b)  Negative  tensile  reinforcement  at  the  supported  end  of  a  restrained  or  cantilever 
beam  or  member  of  a  "rigid  frame"  should  be  extended  in  or  through  the  supporting 
member  in  such  a  manner  as  to  develop  the  maximum  tension  in  the  bar  with  a  bond 
stress  not  exceeding  the  normal  working  stress  provided  in  Sec.  878. 

(c)  Between  the  supports  of  continuous  or  freely  supported  beams,  every  reinforc- 
ing bar  should  be  extended  at  least  12  diameters,  but  not  less  than  one-twentieth  of  the 
span  length,  beyond  the  point  at  which  computations  indicate  it  is  no  longer  needed  to 
resist  stress. 

(d)  In  simply  supported  beams  and  freely  supported  ends  of  continuous  beams,  at 
least  one-third  of  the  positive  reinforcement  should  extend  into  the  supports  a  distance 
sufficient  to  develop  one-half  the  allowable  stress  in  the  bars. 

(e)  In  restrained  or  continuous  beams  at  least  one-fourth  of  the  positive  reinforce- 
ment should  extend  into  the  supports  and  the  remainder  treated  as  provided  in  (c). 

(f)  In  restrained  or  continuous  beams  at  least  one-third  of  the  total  reinforcement 
provided  for  negative  moment  should  extend  beyond  the  point  of  inflection  a  distance 
sufficient  to  develop  one-half  the  allowable  stress  in  the  bars  so  extended.  Negative  steel 
not  so  extended  should  be  treated  as  provided  in  (c). 


82 Report    on    Concrete    and    Reinforced    Concrete 

830.  Anchorage  of  Web  Reinforcement 

(a)  The  stress  in  a  stirrup  or  other  web  reinforcement  should  not  exceed  the 
capacity  of  its  anchorage  in  the  upper  or  lower  one-half  of  the  effective  depth  of  the 
beam. 

(b)  Web  reinforcement  which  is  provided  by  bending  into  an  inclined  position  one 
or  more  bars  of  the  main  tensile  reinforcement  where  not  required  for  resistance  to  posi- 
tive or  negative  bending,  may  be  considered  completely  anchored  by  continuity  with  the 
main  tensile  reinforcement,  or  by  embedment  of  the  requisite  length  in  the  upper  or  lower 
half  of  the  beam,  provided  at  least  one-half  of  such  embedment  is  as  close  to  the  upper 
or  lower  surface  of  the  beam  as  the  requirements  of  fire  and  rust  protection  allow.  A 
hook  placed  close  to  the  upper  or  lower  surface  of  the  beam  may  be  substituted  for  a 
portion  of  such  embedment. 

(c)  Stirrups  should  be  anchored  at  both  ends  by  one  of  the  following  methods,  or 
by  a  combination  thereof: 

1.  Rigid  attachment,  as  by  welding,  to  the  main  longitudinal  reinforcement. 

2.  Bending  around  and  closely  in  contact  with  a  bar  of  the  longitudinal 
reinforcement,  in  the  form  of  a  U-stirrup  or 'hook. 

3.  A  hook  placed  as  close  to  the  upper  or  lower  surface  of  the  beam  as  the  re- 
quirements of  fire  and  rust  protection  will  allow.  In  estimating  the  capacity  of  this 
anchorage  the  stress  developed  by  bond  between  mid-height  of  the  beam  and  the 
center  of  bending  of  the  hook  may  be  added  to  the  capacity  of  the  hook. 

4.  An  adequate  length  of  embedment  in  the  upper  or  lower  one-half  of  the 
effective  depth  of  the  beam,  whether  straight  or  bent.  Anchorage  of  this  type  alone 
should  not  be  relied  on  for  stirrups  in  cases  where  the  shearing  stress  in  the  web 
exceeds  that  recommended  for  beams  without  end  anchorage  of  the  reinforcement. 
(See  Sec.  878.) 

Flat  Slabs 

831.  General 

The  design  of  flat  slabs  is  based  on  generally  accepted  empirical  methods.  These 
methods  have  been  developed  partly  by  analysis  and  partly  by  tests  on  models,  full  size 
test  panels,  and  on  a  wide  range  of  completed  structures.  Accordingly,  the  special  pro- 
visions relating  to  the  design  of  flat  slabs  apply  only  where  certain  general  limitations 
are  observed. 

832.  Limitations 

(a)  These  provisions  apply  to: 

1.  Concrete  slabs,  without  beams  or  girders,  built  monolithically  with  the  sup- 
porting columns.  These  slabs  may  be  increased  in  thickness  at  the  supports  by  the 
use  of  drop  panels,  or  along  the  margins  to  form  paneled  ceilings. 

2.  A  series  of  rectangular  slabs  of  approximately  uniform  dimensions  arranged 
in  three  or  more  rows  of  panels  in  each  direction,  and  in  which  the  ratio  of  length 
to  width  of  panel  does  not  exceed  1.33. 

3.  Slabs  with  drop  panels  having  a  length  in  each  direction  of  approximately 
one-third  of  the  panel  length  in  that  direction.  Also  to  continuous  drop  panels  that 
form  paneled  ceilings,  in  which  the  continuous  drops  have  a  width  approximately 
one-third  of  the  panel  width. 

4.  Slabs  with  drop  panels  in  which  the  total  thickness  of  the  slabs  through  the 
drops  docs  not  exceed  one  and  one-half  times  the  thickness  of  the  slabs  beyond  the 
drops. 


Flat    Slabs 83 

(b)  Structures  having  a  width  of  less  than  three  rows  of  panels,  or  in  which  the 
adjacent  panel  dimensions  vary  by  more  than  IS  percent,  are  outside  the  scope  of  these 
provisions  and  require  special  analysis. 

833.  Notation 

The  following  notation  applies  to  the  design  of  flat  slabs  except  when  otherwise 
specifically  stated: 

Mo  =  Sum  of  the  total  positive  and  negative  bending  moments  at  the  principal 
design  sections  in  either  direction,  the  sections  being  parallel  to  the  margins 
of  the  panels. 

c  =  Effective  diameter  in  feet  of  a  round  column  capital,  at  the  underside  of  the 
slab  or  drop  panel.  No  portion  of  the  column  capital  should  be  considered 
effective  which  Ues  outside  of  the  largest  90  deg.  cone  that  can  be  included 
within  the  outlines  of  the  column  capital.  When  a  square,  or  other  sym- 
metrically shaped  capital  is  used,  c  is  the  diameter  of  a  circle  whose  area  is 
equal  to  the  area  of  the  base  of  the  largest  90  deg.  pyramid  which  can  be 
included  within  the  outlines  of  the  column  capital. 

/  =  Span  length,  in  feet,  center  to  center  of  the  columns  along  the  panel  margins, 
in  the  direction  in  which  moments  are  computed. 

Zi  =  Span  length,  in  feet,  center  to  center  of  columns  perpendicular  to  the  direc- 
tion of  the  span  for  which  moments  are  computed. 
w  =^  Total  dead  and  live  load  in  lb.  per  sq.  ft.  of  loaded  area. 

d  =  Effective  depth,  in  inches,  of  the  slab  at  any  point. 

/i  =z  Total  thickness,  in  inches,  of  the  slab  with  or  without  drops,  at  the  boundary 
of  the  column  capitals. 

^2  =  Total  thickness,  in  inches,  of  the  slab  beyond  the  boundary  of  the  drop. 

834.  Panel  Strips  and  Principal  Design  Sections 

(a)  A  fiat  slab  panel  is  considered  as  consisting  of  strips  in  each  direction  as  follows: 
A  middle  strip  one-half  panel  in  width,  symmetrical  about  panel  center  line  and 

extending  through  the  panel  in  the  direction  in  which  moments  are  considered. 

A  column  strip  one-half  panel  in  width  occupying  the  two  quarter-panel  areas 
outside  of  the  middle  strip. 

(b)  The  critical  sections  for  moment  calculations  are  referred  to  as  principal  design 
sections  and  are  located  as  follows: 

Sections  for  negative  moment  along  the  edges  of  the  panel,  on  hnes  joining  the 
column  centers,  except  that  they  follow  the  perimeter  of  the  column  capital  instead 
of  passing  through  it. 

Sections  for  positive  moment  along  the  center  lines  of  the  panel. 

(c)  In  the  two-way  system  it  is  assumed  that  the  tensile  stresses  due  to  the  moments 
in  the  various  strips  are  resisted  by  the  band  of  reinforcing  bars  located  within  the  strip. 

(d)  In  the  four-way  system,  or  any  other  system  of  reinforcement,  in  which  a  part 
or  all  of  the  reinforcement  is  not  parallel  to  the  direction  of  the  span,  it  may  be  assumed 
that  the  tension  due  to  bending  moments  at  any  section  of  a  strip  is  resisted  by  the 
components,  in  the  direction  of  the  span,  of  all  the  reinforcement  included  within  the 
boundary  of  the  section  under  consideration. 

(e)  The  width  of  the  column  head  section  for  computing  compression  should  be 
taken  as  the  width  of  the  drop  or  half  the  width  of  the  panel  (O.S/i)  where  no  drop 
is  used. 

835.  Bending  Moments  in  Rectangular  Flat  Slabs 

(a)  The  total  bending  moment  M„,  in  the  direction  of  cither  side  of  the  panel,  is 
divided  between  the  sections  of  positivo  nnd  nrgnfivo  niomcnl,  I  ho  I)asis  of  division  dc- 


84 Report    on    Concrete    and    Reinforced    Concrete 

pending  on  the  size  of  columns,  column  capitals,  and  dimensions  of  the  panels.  For 
average  conditions,  approximately  three-eighths  of  the  total  may  be  considered  positive, 
and  five-eighths  negative  moment.  Slabs  with  drops  are  assumed  to  develop  about  5  per- 
cent more  negative  moment  than  slabs  of  uniform  thickness,  and  to  have  a  corresponding 
decrease  in  the  positive  moment.  Furthermore,  the  column  strips  are  assumed  to  take  75 
to  80  percent  of  the  total  negative  moment  and  SO  to  56  percent  of  the  total  positive 
moment.  The  detail  distribution  of  the  total  moment  varies  to  a  moderate  extent 
depending  on  the  system  of  reinforcement  employed. 

(b)  Total  Bending  Moment. — For  interior  panels  carrying  an  assumed  uniformly 
distributed  load  the  numerical  sum  of  the  positive  and  negative  moments  at  the  prin- 
cipal design  sections  in  the  direction  of  either  side  of  a  rectangular  panel  is  given  by  the 
formula: 

M„=.09  {l  —  ~  cYwU (6) 

3 

(c)  Distribution  of  Moments. — For  interior  panels  the  distribution  of  the  total 
moment  Mo  at  the  principal  design  sections  is  given  in  Table  6.  This  distribution  agrees 
with  the  1924  Joint  Committee  Report  and  with  well-established  requirements  in  this 
country,  and  is  in  close  agreement  with  European  practice. 

Table  6 — Moments  to  be  Used  in  Design  of  Flat  Slabs  for  Interior  Panels 

Flat  Slabs  without  Drops  Flat  Slabs  with  Drops 

Strip  Negative  Positive  Negative  Positive 

Slabs  with  Two-Way  Reinforcement 


Column  strip 
Middle  strip 

0.46Mo               0.22Mo              0. 50Mo               0. 20M,, 
0. 16M,,               0.  I6M0              O.lSMo               0. 15Mo 

Slabs  with  Four- Way  Reinforcement 

Column  strip 
Middle  strip 

0. 50Mo               O.2OM0              0.54M„               0.19Mo 
0.  lOMo               0.20M,,              O.O8M0               0. 19A/o 

836.  Tolerances  Applicable  to  Table  6 

(a)  The  moment  coefficients  given  in  Table  6  may  be  varied  by  not  more  than  six 
percent,  provided  the  numerical  sum  of  the  positive  and  the  negative  moments  at  the 
principal  design  sections  is  not  reduced. 

(b)  The  ratio  of  reinforcement  at  any  section  of  any  band  should  not  be  less  than 
0.0025. 

837.  Conditions  of  Restraint  at  Discontinuous  Edges 

The  modifications  of  moments  at  discontinuous  edges  are  based  on  the  assumption 
that  the  slab  is  restrained  by  the  supporting  beam  framed  into   columns  of  adequate 

rigidity.  A  column  (or  two  columns-  one  above  the  other)  having  a  stiffness  factor    ~r- 

at  least  equal  to   IJ^   times  the  stiffness   factor   of   the   slab  j-y    may   be  assumed   as 

adequate.  The  moment  of  inertia  (I)  of  the  slab  section  may  be  computed  on  the  basis 
of  a  width  equal  to  the  column  spacing  and  a  depth  equal  to  the  slab  thickness  plus 
one-third  the  depth  of  the  drop. 


^ Flat    Slabs 85 

838.  Moments  in  Discontinuous  Panels 

(a)  In  the  case  of  end  or  side  panels  when  the  slab  is  not  continuous  on  one  edge 
or  two  adjacent  edges,  and  in  which  the  restraint  at  the  discontinuous  edge  is  as  defined 
in  Sec.  837,  the  bending  moments  as  given  in  Table  6  should  be  modified  as  follows: 

1.  In  the  column  strip  the  negative  moment  at  the  first  interior  column  line  and 
the  positive  moment  at  the  center  of  the  end  panel  should  be  increased  15  percent 
over  the  moments  given  for  interior  panels.  For  the  middle  strip  the  corresponding 
moments  should  be  increased  30  percent. 

2.  At  the  wall  or  discontinuous  edge  the  negative  moments  in  the  column  strip 
and  middle  strips  perpendicular  to  such  edge  may  be  reduced  by  20  percent  from 
those  given  for  interior  panels. 

3.  The  half  column  strip  adjacent  and  parallel  to  a  supported  edge  may  be 
designed  for  one-quarter  of  the  full  column  strip  moment  given  in  Table  6. 

(b)  In  slabs  supported  at  the  discontinuous  edge  by  bearing  walls,  or  where  they  are 
not  restrained,  the  positive  moments  in  the  strips  perpendicular  to  the  wall  should  be 
increased  50  percent. 

(c)  When  there  is  a  beam  or  bearing  wall  at  the  center  line  of  columns  in  the 
interior  portion  of  a  continuous  flat  slab,  the  negative  moment  in  the  middle  strip  per- 
pendicular to  the  wall  or  beam  should  be  increased  30  percent.  The  column  strip  adjacent 
and  parallel  to  the  wall  may  be  treated  as  in  (a)3,  the  remaining  strips  as  in  Table  6. 

(d)  At  discontinuous  edges  the  positive  and  negative  reinforcement  should  extend  to 
within  two  inches  of  the  edge  of  the  panel  and  be  anchored  in  accordance  with  Sec.  828. 

839.  Thickness  of  Slab  and  Drop  Panel 

(a)  The  effective  depth  of  the  slab,  with  or  without  drop,  is  determined  on  the 
basis  of  negative  bending  moment  and  shear  at  the  support  and  the  allowable  stresses. 
Since  the  negative  moment  is  not  uniform  over  the  full  width  of  the  column  strip,  being 
higher  at  the  center  line  than  at  the  edges,  the  thickness  determined  on  the  basis  of 
coefficients  given  in  Table  6  and  the  allowable  unit  stress  will  result  in  excess  com- 
pressive stress  at  the  middle  of  the  section.  The  thickness  computed  in  this  manner, 
therefore,  is  to  be  increased  as  provided  in  (c). 

(b)  In  order  to  prevent  undue  deflection,  and  provide  adequate  depth  where  two  or 
more  bands  of  reinforcement  are  placed  in  layers  at  any  section,  the  thickness  at  the 
center  of  the  panel  should  not  be  less  than  the  following  limiting  values,  regardless  of 
the  values  determined  under  (c). 

1.  Floor  slabs  with  drop  panels,  4J/2  in. 
Floor  slabs  without  drop  panels,  S  in. 

2.  Roof  slabs  with  drop  panels,  ilA  in. 
Roof  slabs  without  drop  panels,  4  in. 

3.  Floor  slabs:   2,500-lb.  concrete 

a.  End  panels,  0.030/ 

b.  Interior  panels,  0.026/ 

4.  Roof  slabs:  2,500-lb.  concrete 

a.  End  spans,  0.025/ 

b.  Interior  spans,  0.023/ 

5.  For  concrete  having  a   28-day   compressive  strength  other  than   2,500  p.s.i., 

3/2,500 
limitations  3  and  4  may  be  modified  by  multiplying  the  coenicients  by  A/  — r, — 


86 Report    on    Concrete    and    Reinforced    Concrete 

(c)  Interior  Panels. — The  total  thickness,  /i,  of  the  slab  with  or  without  drops,  may 
be  determined  from  Formula   (7)  as  follows: 

ti  =  1.2d+iy2  in (7) 

in  which  d  =  the  effective  depth  of  the  slab,  computed  on  the  basis  of  the  negative 
moments  given  in  Table  6  and  the  assumed  unit  stresses  governing  the  case  under  con- 
sideration (using  balanced  reinforcement). 

For  slabs  with  drops  the  width  of  the  section  resisting  negative  bending  in  the 
column  strip  should  be  hmited  to  the  width  of  the  drop.  For  slabs  without  drops  the 
full  width  of  the  column  strip  may  be  used. 

The  thickness,  fz,  of  the  slab  beyond  the  boundary  of  the  drop  should  not  be  less 
than  two  thirds  of  ii. 

(d)  Exterior  Panel — For  exterior  panels  the  thickness  of  the  slabs  will  vary  accord- 
ing to  the  modifications  in  moment  coefficients  given  in  Sec.  838.* 

840.  Beams  in  Flat  Slab  Construction 

(a)  Marginal  Beams  Framing  into  Columns. — Beams  or  thickened  margins  should  be 
used  at  all  discontinuous  edges  of  fiat  slabs.  They  may  be  placed  above  or  below  the 
slab  and  should  be  cast  monolithically  with  it.  Such  beams  should  be  designed  to  carry, 
in  addition  to  the  loads  directly  upon  them,  a  uniformly  distributed  load  equal  to  one- 
fourth  the  total  dead  and  live  load  for  which  the  adjacent  panel  is  designed. 

(b)  Interior  Beams. — When  an  interior  beam  framing  into  columns  is  required  for 
some  special  load,  it  should  be  designed  as  a  T-beam  to  carry  in  addition  to  the  special 
load  a  uniformly  distributed  load  equal  to  one-quarter  of  the  total  load  on  the  adjacent 
panels. 

Where  interior  beams  are  supported  by  girders  that  frame  into  columns  the  whole 
panel  should  be  framed  to  avoid  uncertainty  of  moment  and  load  distribution. 

841.  Column  Capitals — Brackets — Drops 

(a)  The  effective  diameter  of  the  column  capital  as  defined  in  Sec.  833  should  not 
be  less  than  0.20/^  where  /  =:  span  length  in  square  panels  or  the  average  span  length  in 
rectangular  panels. 

(b)  Brackets. — Brackets  on  exterior  columns  may  be  substituted  for  capitals,  pro- 
vided the  sloping  face  of  the  bracket  makes  an  angle  of  not  more  than  45  deg.  with  the 
face  of  the  column,  and  is  not  less  in  width  than  the  column.  The  value  of  c  is  twice 
the  distance  from  center  of  column  to  the  point  where  the  bracket  is  1^  in.  in  depth. 

(c)  Drops. — The  drop  should  have  a  length  in  each  direction  not  less  than  one-third 
of  the  panel  length  in  that  direction.  If  the  shearing  stresses  at  the  edge  of  the  drop 
exceed  the  allowable  values  given  in  Sec.  878,  then  the  dimensions  of  the  drop  or  the  slab 
thickness  outside  the  drop  should  be  increased. 

(d)  If  drop  panels  are  used  for  interior  columns  they  should  also  be  used  for  wall 
columns. 

842.  Points  of  Inflection 

For  purposes  of  design  the  point  of  inflection  in  any  line  parallel  to  a  panel  edge  in 
interior  panels  of  symmetrical  slabs  without  drop  panels  should  be  assumed  to  be  at  a 
distance  from  the'  center  of  the  span  equal  to  three-tenths  of  the  distance  between  two 
sections  of  critical  negative  moments;  for  slabs  having  drop  panels,  the  coefficient  should 
be  0.25.  For  end  spans  the  position  of  the  point  of  inflection  is  to  be  modified  in 
accordance  with  the  mechanics  of  restrained  beams. 


*  For  end  spans  equal  in  length  to  interior  spans,  the  increase  in  thickness  is  approximately  8  per- 
cent. A  uniform  slab  thickness  throughout  the  floor  construction  may,  therefore,  be  obtained  by  making 
end  panels  8  percent  shorter  than  the  interior  spans. 


Flat    Slabs 87 

843.  Arrangement  of  Reinforcement 

The  design  should  include  adequate  provision  for  securing  the  reinforcement  in  place 
so  as  to  resist  not  only  the  critical  moments  but  the  moments  at  intermediate  sections. 
Provision  should  be  made  for  possible  shifting  of  the  point  of  inflection  by  carrying  all 
bars  in  rectangular  or  diagonal  directions,  each  side  of  a  section  of  critical  moment, 
either  positive  or  negative,  to  points  at  least  one-fifeenth  of  the  span  length  beyond 
the  assumed  point  of  inflection  as  recommended  in  Sec.  842.  Lapped  splices  should  not 
be  permitted  at  or  near  regions  of  maximum  stress.  At  least  four-tenths  of  all  bars  in 
each  direction  should  be  of  such  length  and  should  be  so  placed  as  to  provide  reinforce- 
ment at  two  sections  of  critical  negative  moment  and  at  the  intermediate  section  of 
critical  positive  moment.  Not  less  than  one-quarter  of  the  bars  used  for  positive  rein- 
forcement in  the  column  strip  should  extend  into  the  drop  not  less  than  20  diameters  of 
the  bar,  or  in  case  no  drop  is  used,  should  extend  to  a  point  not  more  than  one-twelfth 
of  the  span  length  from  the  center  hne  of  the  column  or  the  support.  Where  drop  panels 
are  used,  at  least  half  of  the  cross-sectional  area  of  the  negative  reinforcement  in  the 
column  strip  should  be  within  the  width  of  the  strip  directly  above  the  drop  panel. 

844.  Tensile  Stress  and  Area  of  Steel  Reinforcement 

The  tensile  stress  /s  in  the  steel  and  the  total  area  ^s  of  the  reinforcement  for  any 
critical  section  of  design  strips  may  be  computed  by  the  formula: 

i.=J^ (8) 

Wherein  Ms  z=  the  moment  given  in  Table  6  for  column  strip  or  for  middle  strip. 

;  z=  the  usual  ratio  of  the  moment  arm  of  the  internal  force  couple  to  the 

effective  depth. 
d  =  effective  depth   of   slab   at  the  point  in   question;   that  is,   the   distance 

from  the  centroid  of  the  tensile  steel  to  the  compressive  face. 
i4s  =  effective  cross-sectional  area  of  the  reinforcement  which  crosses  any  of  the 
principal  design  sections  and  meets  the  requirements  of  Sec.  &2)A(d). 

The  stress  so  computed  should  not  exceed  the  allowable  working  stress  given  in  Sec.  878. 

845.  Compressive  Stresses  and  Compression  Reinforcement 

Tests  indicate  that  stresses  are  not  uniformly  distributed  along  the  width  of  the 
column  strip.  This  has  been  recognized  in  Sec.  839  where  provision  is  made  for  thickness 
of  slab.  Cases  occur,  however,  as  in  the  end  spans,  where  it  is  desirable  to  maintain  the 
same  slab  thickness  as  for  interior  panels.  This  can  be  done  by  the  introduction  of 
compression  reinforcement  at  the  section  of  maximum  negative  moment. 

846.  Shearing  Stresses  in  Flat  Slabs 
See  Sec.  820. 

847.  Bond  Stresses 

See  Sec.  823  to  830. 

848.  Openings  in  Flat  Slabs 

Openings  of  any  size  may  be  cut  through  a  flat  slab  if  provision  is  made  for  the 
total  positive  and  negative  resisting  moments  as  required  in  Sec.  83.'5  without  exceeding 
the  allowable  stresses  as  given  in  Sec.  878. 

849.  Columns  Supporting  Flat  Slabs 

For  requirements  relating  to  bending  moments  in  columns  and  limitation  of  column 
dimensions  in  connection  with  flat  slab  construction,  see  Sec.  859. 


83 Report    on    Concrete    and    Reinforced    Concrete 

850.  Special  Construction 

(a)  The  preceding  recommendations  for  the  design  of  flat  slabs  should  not  be  applied 
to  other  than  the  two  systems  of  reinforcement  described,  or  to  those  systems  where 
brackets  or  column  capitals  are  omitted,  unless  analysis  supported  by  adequate  test  data 
indicates  that  the  stresses  at  the  principal  design  and  intermediate  sections  do  not  exceed 
the  allowable  unit  stresses  specified  in  Sec.  878. 

(b)  For  structures  having  a  width  of  one  or  two  panels,  or  having  panels  of  mark- 
edly different  dimensions,  an  analysis  should  be  made  of  the  moments  developed  in  both 
the  slabs  and  the  columns,  and  the  requirements  recommended  in  the  preceding  sections 
modified  accordingly. 

Reinforced  Concrete  Columns 

851.  General 

(a)  The  following  recommendations  are  based  largely  on  the  results  of  the  extensive 
American  Concrete  Institute  Column  Investigation.  Recognizing  the  presence  of  undesir- 
able column  shortening  due  to  creep  and  shrinkage  when  small  percentages  of  vertical 
steel  are  used,  the  minimum  value  is  set  at  one  percent;  furthermore,  a  varying  factor 
of  safety  is  used,  ranging,  for  axially  loaded  spiral  columns,  from  about  3.6  for  p  =z  0.01 
to  2.75  for  p  ■=.  0.08.  A  similar  variation  from  about  4.5  for  p  =  0.01  to  4.0  for  p  =  0.04 
is  used  with  tied  columns. 

(b)  The  formula  for  spiral  columns  is  based  upon  recognition  of  the  fact  that  the 
strength  produced  by  spirals  is  accompanied  by  spalling  of  the  column  shell  and  excessive 
column  shortening,  hence  the  spiral  is  utihzed  only  as  a  toughening  element  or  an  insur- 
ance against  a  sudden  and  complete  collapse  of  the  column.  With  spiral  reinforcement 
provided,  which  is  somewhat  stronger  than  the  protective  shell,  these  two  elements  of 
strength  (which  cannot  act  simultaneously)  become  interchangeable,  and  justify  the  for- 
mula which  uses  gross  area  of  column  and  omits  any  reference  to  the  spiral.  The  formulas 
for  tied  and  spiral  columns  are  thus  made  identical,  except  that  the  latter  is  allowed  25 
percent  greater  load-carrying  capacity  because  of  the  presence  of  adequate  spiral  rein- 
forcement to  carry  part  of  the  load  if  the  outer  shell  should  spall. 

(c)  The  design  of  long  columns,  both  tied  and  spirally  reinforced,  is  covered  by  a 
single  equation  based  on  the  height-diameter  ratio.  With  the  test  data  available,  no  in- 
crease in  accuracy  would  be  attained  by  basing  the  slenderness  ratio  on  the  radius  of 
gyration. 

(d)  The  treatment  of  bending  in  columns  is  intended  to  correlate  with  the  methods 
given  in  Sec.  805  for  continuous  beams  and  frames.  Recent  studies  of  creep  indicate  that 
the  current  analyses  of  combined  bending  and  direct  stress  are  not  accurate,  and  that 
for  cases  in  which  the  compressive  stress  governs  the  design,  the  theory  of  the  uncracked 
concrete  section  applies  without  serious  error.  The  permissible  combined  stresses  in  Sec. 
860-861  are  based  on  test  data;  they  embody  the  fact  that  permissible  bending  stresses 
may  be  greater  than  axial  stresses,  and  they  are  based  on  the  conventional  value  of  n, 
which  produces  the  most  severe  of  the  probable  conditions  that  the  concrete  may  meet 
under  sustained  loading. 

852.  Limiting  Dimensions 

The  following  sections  on  reinforced  concrete  and  composite  columns  (except  Sec. 
858)  apply  to  a  short  column,  for  which  the  unsupported  length  is  not  greater  than  10 
times  the  least  lateral  dimension.  When  the  unsupported  length  exceeds  this  value  the 
design  should  be  modified  as  shown  in  Sec.  858.  Principal  columns  in  buildings  should 


Reinforced    Concrete    Columns 89 

have  a  minimum  diameter  or  thickness  of  10  in.  Posts,  bearing  walls,  piers,  or  mullions, 
that  are  not  continuous  from  story  to  story  should  have  a  minimum  diameter  or  thickness 
of  6  in. 

853.  Unsupported  Length  of  Columns 

(a)  For  purposes  of  determining  the  limiting  dimensions  of  columns,  the  unsupported 
length  of  reinforced  concrete  columns  should  be  taken  as  the  clear  distance  between  floor 
slabs  with  the  following  exceptions: 

1.  In  flat  slab  construction,  it  should  be  the  clear  distance  between  the  floor  and 
the  lower  extremity  of  the  capital. 

2.  In  beam  and  slab  construction,  it  should  be  the  clear  distance  between  the 
floor  and  the  underside  of  the  deepest  beam  framing  into  the  column  in  each 
direction  at  the  next  higher  floor  level. 

3.  In  columns  restrained  laterally  by  struts,  it  should  be  the  clear  distance 
between  consecutive  struts  in  each  vertical  plane;  provided  that  to  be  an  adequate 
support,  two  such  struts  should  meet  the  column  at  approximately  the  same  level 
and  the  angle  between  vertical  planes  through  the  struts  should  not  vary  more  than 
30  deg.  from  a  right  angle.  Such  struts  should  be  of  adequate  dimensions  and 
anchorage  to  restrain  the  column  against  lateral  deflection. 

4.  In  columns  restrained  laterally  by  struts  or  beams,  with  brackets  used  at  the 
junction,  it  should  be  the  clear  distance  between  the  floor  and  the  lower  edge  of  the 
bracket,  provided  that  the  bracket  width  equals  that  of  the  beam  or  strut  and  is  at 
least  half  that  of  the  column,  and  provided  further  that  the  face  of  the  bracket 
makes  an  angle  with  the  face  of  the  column  of_  at  least  45  deg. 

(b)  For  all  columns,  that  length  should  be  considered  which  produces  the  greatest 
ratio  of  length  to  depth  of  section. 

854.  Spirally  Reinforced  Columns 

(a)  Allowable  Load. — The  maximum  allowable  axial  load,  P,  on  columns  reinforced 
with  longitudinal  bars  and  closely  spaced  spirals  enclosing  a  circular  core  is  given  by 
formula   (9).* 

P  =  0.22S/'c.4g  +   A.fs    (9) 

Wherein  i4s^  the  overall  or  gross  area  of  the  column. 

/'c  =z  compressive  strength  of  the  concrete,  as  found  by  tests  of  standard  6  by 

12-in.  control  cylinders,  as  prescribed  in  Sec.  310. 
/,  =  nominal  working  stress  in  vertical  column  reinforcement,  to  be  taken  at 

40  percent  of  the  minimum  specification  value  of  the  yield  point;   viz., 

16,000  p.s.i.  for  intermediate  grade  steel  and  20,000  p.s.i.  for  hard  grade 

or  rail  steel.** 
As—  p^Ag. 
ps  =  ratio  of  the  effective  cross-sectional  area  of  vertical  reinforcement  to  the 

gross  area.  As. 

(b)  Longitudinal  Reinforcement — Amount  and  Spacing. — The  ratio  pg  should  not  be 
less  than  0.01  nor  more  than  0.08.  The  minimum  number  of  bars  should  be  six,  and  the 
minimum  diameter  of  bar  should  be  %  in.  The  center  to  center  spacing  of  bars  within 

*  To  be  logical  the  area  of  the  steel  should  be  subtracted  from  .i^  in  the  formula.  However,  the 
effect  of  the  small  area  of  concrete  displaced  by  the  reinforcement  has  been  taken  into  consideration  in 
arriving  at  the  coefficient  0.225  applied  to  /V- 

**  Nominal  working  stresses  for  reinforcement  of  higher  yield  point  may  be  established  40  percent 
of  the  yield  point  stress,  but  not  more  than  30,000  p.s.i.,  when  the  properties  of  such  reinforcing  steels 
have  been  definitely  specified  by  standards  of  ASTM  designation.  If  this  is  done,  the  lengths  of  splice 
required  by  (c)  shall  be  increased  accordingly. 


90 Report    on    Concrete    and    Reinforced    Concrete 

the  periphery  of  the  column  core  should  not  be  less  than  lYi  times  the  diameter  for 
round  bars  or  3  times  the  side  dimension  for  square  bars.  The  clear  spacing  between 
individual  bars  or  between  pairs  of  bars  at  lapped  splices  should  not  be  less  than  II/2  in. 
or  V/z  times  the  maximum  size  of  the  coarse  aggregate  used.   (See  Sec.  504.) 

(c)  Splices  in  Longitudinal  Reinforcement.- — ^Where  lapped  sphces  in  the  column 
verticals  are  used,  the  minimum  amount  of  lap  should  be  as  follows: 

1.  For  deformed  bars. — ^With  concrete  having  a  strength  of  3,000  p.s.i.  or  above, 
24  diameters  of  bar  of  intermediate  grade  steel  and  30  diameters  of  bar  of  hard 
grade  steel.  For  bars  of  higher  yield  point,  the  amount  of  lap  should  be  increased 
in  proportion  to  the  nominal  working  stress.  When  the  concrete  strengths  are  less 
than  3,000  p.s.i.  the  amount  of  lap  should  be  one-third  greater  than  the  values  just 
given. 

2.  For  plain  bars. — The  minimum  amount  of  lap  should  be  25  percent  greater 
than  that  specified  for  deformed  bars. 

Where  changes  in  the  cross  section  of  a  column  occur,  the  longitudinal  bars 
should  be  sloped  for  the  full  length  of  the  column,  or  offset  in  a  region  where  lateral 
support  is  afforded  by  concrete  capital,  floor  slab,  metal  ties,  or  reinforcing  spirals. 
Where  bars  are  offset,  the  slope  of  the  inclined  portion  from  the  axis  of  the  column 
should  not  exceed  1  in  6  and  the  bars  on  each  side  of  the  offset  should  be  parallel 
to  the  axis  of  the  column. 

Welded  splices  or  other  positive  connections  may  be  used  instead  of  lapped 
splices.  Welded  splices  should  preferably  be  used  in  cases  where  the  bar  diameter 
exceeds  iVi  in.  An  approved  welded  splice  should  be  defined  as  one  in  which  the 
bars  are  butted  and  welded  and  that  will  develop  in  tension  at  least  the  yield  point 
stress  of  the  reinforcing  steel  used. 

(d)  Spiral  Reinforcement. — The  ratio  of  spiral  reinforcement,  p',  should  not  be  less 
than  the  value  given  by  Formula  (10). 

,.=0^4S[A_,]Z^ <,0) 

Wherein  p'   =:  ratio   of  volume  of  spiral   reinforcement  to   the  volume   of   the  concrete 
core  (out  to  out  of  spirals). 
Ag/A  c  =  ratio  of  gross  area  to  core  area  of  column. 

/'s  =  useful  limit  stress  of  spiral  reinforcement  to  be  taken  as  40,000  p.s.i.  for 
hot  rolled  rod  of  intermediate  grade,  50,000  p.s.i.  for  hard  grade  and 
60,000  p.s.i.  for  cold  drawn  wire. 

Spiral  reinforcement  should  consist  of  evenly  spaced  continuous  spirals  held  firmly 
in  place  and  true  to  line  by  at  least  three  vertical  spacer  bars.  For  columns  up  to  18-in. 
core  diameter,  the  minimum  diameter  of  spiral  bars  should  be  "%,  inch.  For  columns 
larger  than  18-in.  core  diameter,  the  minimum  diameter  of  spiral  bars  should  be  ^  in. 
Anchorage  of  spiral  reinforcement  should  be  provided  hy  ly^  extra  turns  of  spiral  rod 
or  wire  at  ench  end  of  the  spiral  unit.  Splices,  where  necessary,  should  be  made  in  spiral 
rod  or  wire  by  welding  or  by  a  lap  of  1^  turns.  The  center  to  center  spacing  of  the 
spirals  should  not  exceed  one-sixth  of  the  core  diameter.  The  clear  spacing  between 
spirals  should  not  exceed  3  in.  nor  be  less  than  15^  in.  or  V/2  times  the  maximum  size  of 
coarse  aggregate  used.  The  column  reinforcement  should  be  protected  everywhere  by  a 
covering  of  concrete  cast  monoUthically  with  the  core,  for  which  the  thickness  should  not 
be  less  than  V/z  in.  nor  less  than  IJ^  times  the  maximum  size  of  the  coarse  aggregate, 
nor  should  it  be  less  than  required  by  the  fire  protection  and  weathering  provisions  of 


R  einforced    Concrete    Columns    91 

Sec.  SOS  and  S06.  The  reinforcing  spiral  should  extend  from  the  floor  level  in  any  story 
to  the  level  of  the  lowest  horizontal  reinforcement  in  the  slab,  drop  panel,  or  beam  above. 
In  a  column  with  a  capital,  it  should  extend  to  the  plane  at  which  the  sectional  area  of 
the  capital  is  twice  that  of  the  column. 

(e)  Limits  of  Column  Section. — For  columns  built  monolithically  with  concrete 
walls  or  piers,  the  outer  boundaries  of  the  column  section  should  be  taken  as  a  circle 
lJ/2  in.  outside  the  column  spiral  or  as  a  square  the  sides  of  which  are  IJ/2  in.  outside  the 
spiral.  In  case  two  or  more  spirals  are  used  in  such  a  column  the  outer  boundary  should 
be  taken  as  a  rectangle  the  sides- of  which  are  at  any  point  at  least  V/z  in.  outside  of 
the  spirals.  For  these  types  of  spirally  reinforced  columns  the  value  of  Ag  thus  defined 
should  be  used  in  both  Formulas  (9)   and  (10). 

(f)  Equivalent  Circular  Columns. — As  an  exception  to  the  general  procedure  of 
utihzing  the  full  gross  area  of  the  column  section,  it  should  be  permissible  to  design  a 
circular  column  and  to  build  it  with  a  square,  octagonal,  or  other  shaped  section  of  the 
same  least  lateral  dimension.  In  such  case,  the  allowable  load,  the  gross  area  considered, 
and  the  required  percentages  of  reinforcement  should  be  taken  as  those  of  the  circular 
column. 

855.  Tied  Columns 

(a)  Allowable  Load. — The  maximum  allowable  axial  load  on  columns  reinforced 
with  longitudinal  bars  and  separate  lateral  ties  should  be  80  percent  of  that  given  by 
Formula  (9).  The  ratio,  pg,  to  be  considered  in  tied  columns  should  not  be  less  than  0.01 
nor  more  than  0.04.  The  longitudinal  reinforcement  should  consist  of  at  least  four  bars 
of  minimum  diameter  of  Yf,  in.  placed  with  a  clear  distance  from  the  column  face  of 
not  less  than  V/z  in.  plus  the  thickness  of  the  tie,  provided  that  when  nearer  a  corner 
than  4  in.  this  covering  shall  be  increased  to  2  in.  Sphces  in  reinforcing  bars  shall  be 
made  as  described  in  Sec.  ?,SA(c). 

(b)  Lateral  Ties. — Lateral  ties  should  be  at  least  ^/4  in.  in  diameter  and  should  be 
spaced  apart  not  over  16  bar  diameters,  48  tie  diameters,  or  the  least  dimension  of  the 
column.  When  there  are  more  than  four  vertical  bars,  additional  ties  should  be  provided 
so  that  every  longitudinal  bar  is  held  firmly  in  its  designed  position. 

(c)  Limits  of  Column  Section. — In  a  tied  column  which  for  architectural  reasons 
has  a  larger  cross  section  than  required  by  considerations  of  loading,  a  reduced  effective 
area  A^  not  less  than  one-half  of  the  total  area  may  be  used  in  applying  the  provisions 
of  Sec.  SSS(a),  but  the  longitudinal  reinforcement  should  be  distributed  over  the  full 
column  section. 

856.  Composite  Columns 

(a)  Allowable  Load. — The  allowable  load  on  a  composite  column  consisting  of  a 
structural  steel  or  cast-iron  column  thoroughly  encased  in  concrete  reinforced  with  both 
longitudinal  and  spiral  reinforcement,  should  not  exceed  that  given  by  Formula  (11). 

P    =:0.22SA,fc   +   Ms   +    frAr    (11) 

Wherein  Ac  r=  net  area  of  concrete  section  ^=^  Ag  —  As  —  At. 

Aa^  cross-sectional  area  of  longitudinal  bar  reinforcement. 
At  =^  cross-sectional  area  of  the  steel  or  cast-iron  core. 

/r  =  allowable  unit  stress  in  metal  core,  not  to  exceed  16.000  p.s.i.  for  a  steel 
core;  or  10,000  p.s.i.  for  a  cast-iron  core. 

The  remaining  notation  is  that  of  Sec.  854. 

(b)  Details  of  Metal  Core  and  Reinforcement. — The  cross-sectional  area  of  the 
metal  core  should  not  exceed  20  percent  of  the  gross  area  of  the  column.  If  a  hollow 


92 Report    on    Concrete    and    Reinforced    Concrete 

metal  core  is  used  it  should  be  filled  with  concrete.  The  amounts  of  longitudinal  and 
spiral  reinforcement  and  the  requirements  as  to  spacing  of  bars,  details  of  splices,  and 
thickness  of  protective  shell  outside  the  spiral  should  conform  to  the  limiting  values 
specified  in  Sec.  854(b),  (c),  and  (d).  A  clearance  of  at  least  three  inches  should  be 
maintained  between  the  spiral  and  the  metal  core  at  all  points  except  that  when  the  core 
consists  of  a  structural  steel  H-column,  the  minimum  clearance  may  be  reduced  to  two 
inches. 

(c)  Splices  and  Connections. — Metal  cores  in  composite  columns  shall  be  accurately 
milled  at  splices  and  positive  provision  shall  be  made  for  alignment  of  one  core  above 
another.  Transfer  of  loads  to  the  metal  core  should  be  provided  for  by  the  use  of  bear- 
ing members  such  as  billets,  brackets,  or  other  positive  connections;  these  should  be  pro- 
vided at  the  top  of  the  metal  core  and  at  intermediate  floor  levels  where  required. 
Ample  section  of  concrete  and  continuity  of  reinforcement  should  be  provided  at  the 
junction  with  beams  and  girders.  The  column  as  a  whole  should  satisfy  the  require- 
ments of  Formula  (11)  at  every  section;  in  addition  to  this,  the  reinforced  concrete 
portion  should  be  designed  to  carry,  in  accordance  with  Formula  (9),  all  floor  loads 
brought  onto  the  column  at  levels  between  the  metal  brackets  or  connections.  In  apply- 
ing Formula  (9)  to  a  hollow  core  filled  with  concrete,  the  area  of  the  concrete  within 
the  core  should  not  be  included  in  the  area  defined  as  Ag.  At  the  column  base,  provision 
should  be  made  to  transfer  the  load  to  the  footing  at  safe  unit  stresses  in  accordance 
with  Sec.  870.  The  base  of  the  metal  core  should  be  designed  to  transfer  the  load  from 
the  entire  composite  column  to  the  footing,  or  it  may  be  designed  to  transfer  the  load 
from  the  metal  section  only,  provided  it  is  so  placed  in  the  pier  or  pedestal  as  to  leave 
ample  section  of  concrete  above  the  base  for  the  transfer  of  load  from  the  reinforced 
concrete  section  of  the  column  by  means  of  bond  on  the  vertical  reinforcement  and  by 
direct  compression  on  the  concrete. 

(d)  Allowable  Load  on  Bare  Metal  Core.- — The  metal  cores  of  composite  columns 
should  be  designed  to  carry  safely  any  construction  or  other  loads  to  be  placed  upon 
them  prior  to  their  encasement  in  concrete. 

857.  Combination  and  Pipe  Columns 

(a)  Combination  Columns;  Steel  Columns  Encased  in  Concrete. — The  allowable  load 
on  a  structural  steel  column  which  is  encased  in  concrete  at  least  2^  in.  thick  over  all 
metal  (except  rivet  heads)  reinforced  as  hereinafter  required,  should  be  computed  by 
Formula  (12). 

^ =^'^'Al+-^^ (12) 

Wherein  Ar=^  cress-sectional  area  of  steel  column. 

/r=  allowable  stress  for  unencased  steel  column. 
Ac  =  total  area  of  concrete  section,  =  As  —  Ar. 

The  concrete  used  should  develop  a  compressive  strength,  /c,  of  at  least  2,000  p.s.i.  when 
tested  according  to  the  provisions  of  Sec.  310.  The  concrete  should  be  reinforced  by 
welded  wire  mesh  having  wire  not  smaller  than  No.  10  gage,  spaced  in  the  vertical 
direction  not  more  than  4  in.,  and  in  the  horizontal  direction  not  more  than  8  in.  This 
mesh  should  extend  entirely  around  the  column  at  a  distance  of  1  in.  inside  the  outer 
concrete  surface  and  should  be  lap-spliced  at  least  40  wire  diameters  and  wired  at  the 
splice. 

Special  brackets  should  be  used  to  receive  the  entire  floor  load  at  each  floor  level. 
The  steel  column  should  be  designed  to  carry  safely  any  construction  or  other  loads  to 
be  placed  upon  it  prior  to  its  encasement  in  concrete. 


Reinforced    Concrete    Columns 9i_ 

(b)  Pipe  Columns. — The  allowable  load  on  columns  consisting  of  steel  pipe  filled 
with  concrete  should  not  exceed  that  given  by  Formula  (13). 

P  —  0.225f',A.  +  f',Ar  (13) 

The  value  of  /r  should  be  that  given  by  Formula  (14). 

/;  =  [  18,000- 70  |-]^  (14) 

Wherein    f'^^  allowable  stress  in  the  steel  pipe  section. 
h   =  unsupported  length  of  column. 
R  =  radius  of  gyration  of  steel  pipe  section. 

P  tensile  yield  point  of  pipe  material 

~  45,000 

If  the  yield  point  is  not  known,  the  factor  F  shall  be  taken  as  0.5. 

If  the  concrete  strength  /'   is  not  known  it  shall  be  assumed  at  2,500  p.s.i. 

858.  Long  Columns 

(a)  The  maximum  allowable  load  P'  on  axially  loaded  reinforced  concrete  or  com- 
posite columns  having  a  length,  //,  greater  than  10  times  the  least  lateral  dimension,  d, 
is  given  by  Formula  (15) 

P'=   p[i.3_.03-^] (IS) 

Wherein  P  =  the  allowable  axial  load  on  a  short   column  as  given  by   Formulas    (9) 
and  (11). 

(b)  The  maximum  allowable  load  P'  on  eccentrically  loaded  columns  in  which  h/d 
exceeds  10  is  also  given  by  Formula  (15)  in  which  P  is  the  allowable  eccentrically  applied 
load  on  a  short  column  as  determined  by  the  provisions  of  Sec.  860-861.  In  long  col- 
umns subjected  to  definite  bending  stres.ses,  as  determined  in  Sec.  859,  the  ratio  h/d 
should  not  exceed  20. 

859.  Bending  Moments  in  Columns 

The  bending  moments  in  the  columns  of  all  reinforced  concrete  structures  should  be 
determined  on  the  basis  of  loading  conditions  and  restraint  and  should  be  provided  for 
in  the  design.  When  the  stiffness  and  strength  of  the  columns  are  utilized  to  reduce 
moments  in  beams,  girders,  or  slabs,  as  in  the  case  of  rigid  frames  in  general,  the  need 
for  recognizing  column  moments  is  obvious;  in  other  forms  of  continuous  construction 
where  column  moments  are  unavoidable,  they  should  also  be  provided  for  in  the  design. 
In  building  frames,  particular  attention  should  be  given  to  cases  of  unbalanced  floor 
loads  on  both  exterior  and  interior  columns  and  of  eccentric  loading  due  to  other  causes. 
Wall  columns  should  be  designed  to  resist  moments  produced  by:  (a)  loads  on  all  floors 
of  the  building,  (b)  loads  on  a  single  exterior  bay  at  two  adjacent  floor  levels,  or 
(c)  loads  on  a  single  exterior  bay  at  one  floor  level.  Resistance  to  bending  moments  at 
any  floor  level  should  be  provided  by  distributing  the  moment  between  the  columns 
immediately  above  and  below  the  given  floor  in  proportion  to  their  relative  stiffnesses 
and  conditions  of  restraint. 

850.  Combined  Axial  and  Bending  Stress 

(a)  In  reinforced  concrete  columns  subjected  to  bending  moments,  the  recognized 
methods  of  analysis  should  be  followed  in  calculating  the  .stresses  due  to  combined  axial 


94  Report    on    Concrete    and    Reinforced    Concrete 

load  and  bending.  The  maximum  fiber  stress  in  compression  and  (in  the  case  of  large 
eccentricities  of  loading)  the  tensile  stress  in  the  vertical  bars  will  govern  the  design. 
The  gross  area  of  both  spiral  and  tied  columns  should  be  used  in  the  computations. 

(b)  For  preliminary  designs  it  will  usually  give  satisfactory  results  to  compute  the 
combined  fiber  stress  in  compre.«;.sion  on  the  basis  of  an  uncracked  section  of  the  column 
using  Formula  (16).* 

U  =  £- — L ^J — (16) 

A,  1  +   (n  -  \)p^ 

Wherein    e  =  eccentricity  of  resultant  load,  measured  from  the  gravity  axis. 
c  =  distance  from  gravity  axis  to  extreme  fiber  in  compression. 
R  =  radius  of  gyration  of  equivalent  concrete  section. 
n  =  as  given  in  Sec.  878. 

Other  terms  as  in  Sec.  854. 

The  term— J- may  be  replaced  by  the  value  —  for  rectangular  columns  and  Se/t  for 
R  t 

round  columns  without  appreciable  error  {t  =:  overall  depth  of  section) .  This  design  may 

then  be  analyzed  by  more  accurate  methods  to  insure  that  allowable  stresses  are  not 

exceeded. 

861.  Allowable  Combined  Axial  and  Bending  Stresses 

(a)  For  spiral  and  tied  columns,  eccentrically  loaded  or  otherwise  subjected  to  com- 
bined axial  compression  and  flexural  stress,  the  maximum  allowable  compressive  fiber 
stress,  /c,  is  given  by  Formula  (17). 

/c  =  /, ^ (17) 

1  +  C-^ 
R'' 

Wherein  the  notation  is  that  of  Sec.  854  and  860,  and  in  addition,  /a  is  the  average 
allowable  stress  on  an  equivalent  axially  loaded  concrete  column,  and  C  is  the  ratio  of  /a 
to  the  allowable  fiber  stress  for  members  in  flexure. 

0.225/e  -f-  fsps 

Thus,  /a  = for  spiral  columns,  and  0.8  of  this  value  for  tied  columns. 

l+(«-l)^g 

/» 


0.4S/e 


(b)  The  allowable  tensile  stress  in  the  longitudinal  reinforcement  may  equal  that 
specified  for  flexural  members,  provided  however  that  splices  in  the  tensile  steel  at  or 
near  the  section  of  maximum  column  moment  are  capable  of  developing  fully  the  yield 
point  strength  of  the  reinforcement. 

862.  Wind  or  Earthquake  Stresses 

When  columns  are  subject  to  wind  or  earthquake  stresses  in  addition  to  combined 
axial  load  and  bending,  the  column  section  need  not  be  increased  unless  the  allowable 
stress  given  by  Formula  (17)  is  exceeded  by  more  than  one-third. 


*  This  will  result  in  a  fairly  accurate  design  if  the  eccentricity  is  less  than   yi   the  overall  column 
width,  and  the  value  of  p  n  is  0.3  or  more. 


I 


____^ Footings 9S 

Footings 

863.  General 

These  recommendations  include  the  design  of  wall,  isolated  and  combined  footings, 
and  raft  foundations. 

For  purposes  of  design  it  is  assumed  that  foundations  may  be  divided  into  com- 
binations of  simple,  continuous,  or  cantilever  beams — statically  determinate — and  pro- 
portioned accordingly. 

It  is  recommended  that  projecting  portions  of  all  footings,  whether  isolated  or  com- 
bined, be  treated  as  simple  cantilever  beams.  This  differs  from  the  practice  of  consider- 
ing trapezoidal  areas  in  computing  bending  moments,  in  that  the  moment  of  the  forces 
over  the  entire  area  on  one  side  of  any  section  is  included  in  the  bending  moment  for 
that  section.  This  provides  a  general  method  of  computing  cantilever  moments  in 
irregular  as  ^yell  as  symmetrically  shaped  footings. 

864.  Unit  Stresses 

Footings  should  be  designed  to  sustain  the  appUed  loads  without  exceeding  the  allow- 
able working  stresses  given  in  Sec.  878.  It  should  be  noted  that  the  allowable  bond  stress 
is  reduced  25  percent  in  all  tension  regions  requiring  moment  reinforcement  in  more  than 
one  direction.  See  also  Sec.  821-827,  and  830. 

865.  Calculation  of  Stresses 

(a)  The  bending,  shearing,  and  bond  stresses  in  isolated  or  combined  footings  should 
be  determined  for  the  critical  sections  indicated  in  Sec.  866.  For  the  projecting  portion 
of  a  footing  the  bending  moment  at  any  section  may  be  considered  as  the  statical  moment 
of  the  forces  over  the  entire  area  of  the  footing  on  one  side  of  a  vertical  plane  passing 
through  that  section.  In  two-way  isolated  footings,  tensile  reinforcement  should  be  de- 
termined on  the  basis  of  85  percent  of  the  moments  thus  computed;  in  one-way  footings, 
such  as  wall  footings,  the  full  moment  should  be  used. 

(b)  For  isolated  footings  cast  as  a  unit,  the  section  resisting  bending  in  any  direc- 
tion may  be  the  full  vertical  section  cut  by  the  plane  about  which  bending  moment  is 
computed,  except  for  the  cases  of  sloped  or  stepped  footings,  as  treated  below. 

In  sloped  footings  the  section  resisting  bending  may  be  as  defined  above  provided 
the  slope  of  the  top  is  not  such  as  to  require  special  treatment  of  the  projecting  cantilever 
as  a  wedge-shaped  beam.  A  slope  of  1  vertical  to  2  horizontal  may  be  considered  as  a 
satisfactory  limit.  The  slope  of  the  footing  top  need  not  be  uniform,  provided  the  limit 
of  1  to  2  is  not  exceeded  at  any  point. 

For  stepped  footings,  cast  as  a  unit,  the  section  resisting  bending  should  be  limited 
to  the  lower  block,  or  to  the  area  falling  within  the  boundaries  of  an  imaginary  sloped 
footing  which  meets  the  above  requirements  as  to  slope  and  which  lies  entirely  within  the 
stepped  footing. 

In  isolated  footings  the  reinforcement  should  be  distributed  over  the  entire  width  of 
the  section. 

(c)  In  case  the  reinforcement  does  not  cross  at  right  angles  a  section  at  which  bend- 
ing moment  is  computed,  only  the  component  normal  to  the  section  should  be  considered 
effective,  that  is,  the  normal  cross-sectional  area  of  the  bar  multiplied  by  the  sine  of  the 
angle  which  the  bar  makes  with  the  section. 

866.  Critical  Sections 

(a)  The  critical  section  for  bending  in  a  concrete  footing  which  supports  a  concrete 
column,  pedestal,  or  wall,  should  be  taken  at  the  face  of  the  column,  pedestal  or  wall. 


96 Report    on    Concrete    and    Reinforced    Concrete 

In  the  case  of  columns  other  than  square  or  rectangular  the  critical  section  should  be 
taken  at  the  side  of  a  concentric  square  of  equivalent  area.  For  footings  under  masonry 
walls  where  bond  with  the  footings  is  reduced  to  friction  value,  the  critical  section  should 
be  assumed  midway  between  the  middle  and  the  edge  of  the  wall.  For  footings  under 
metaUic  column  bases  the  critical  section  should  be  assumed  midway  between  the  face  of 
the  column  and  the  edge  of  the  metalhc  base.  The  load  may  be  considered  as  uniformly 
distributed  over  the  column,  pedestal,  or  wall,  or  metaUic  column  base. 

(b)  The  critical  sections  for  bond  should  be  taken  at  the  same  plane  as  those  for 
bending,  and  the  shear  used  for  computing  bond  should  be  based  on  the  same  loading 
and  section  as  for  bending.  Bond  should  also  be  investigated  at  planes  where  changes 
of  section  or  of  reinforcement  occur. 

(c)  The  critical  section  for  diagonal  tension  in  footings  on  soil  should  be  considered 
as  the  concentric  vertical  section  through  the  footing  at  a  distance  d  from  each  face  of 
the  column,  pedestal,  or  wall.  This  depth  d  should  be  measured  from  the  top  of  the 
section  to  the  plane  of  the  centroid  of  longitudinal  reinforcement. 

(d)  The  critical  section  for  diagonal  tension  for  footings  supported  on  piles  should 
be  considered  as  the  concentric  vertical  section  through  the  footing  at  a  distance  d/2 
from  each  face  of  the  column,  pedestal,  or  wall,  and  any  piles  whose  centers  are  at,  or 
outside  this  section  should  be  included  in  computing  the  shear. 

(e)  In  sloped  or  stepped  footings,  analyses  should  be  made  of  stresses  at  sections 
where  the  slope  or  depth  changes  outside  the  critical  section  as  defined  in  (a),  (b),  (c), 
and  (d)  above. 

867.  Plain  Concrete  Footings 

(a)  In  plain  concrete  footings  the  section  should  be  computed  as  a  monolithic  sec- 
tion of  the  entire  width  and  depth  measured  from  a  plane  two  inches  above  the  bottom 
of  the  footing.  The  maximum  tensile  fiber  stress  in  the  concrete  should  not  exceed  0.03 
of  the  ultimate  compressive  strength  of  the  concrete.  The  average  shearing  stress  should 
not  exceed  0.02  of  the  ultimate  compressive  strength  of  the  concrete,  computed  on  a 
concentric  vertical  section  through  the  footing  at  a  distance  {d  —  2  in.)  from  each  face 
of  the  column,  pedestal,  or  wall,  excluding  2  in.  of  depth  nearest  the  bottom. 

(b)  The  area  of  the  top  of  the  footing  should  not  be  less  than  that  given  by 
Formula  (18),  Sec.  870. 

868.  Combined  Footings  . 

(a)  For  reinforced  concrete  columns,  the  critical  section  for  transverse  bending 
should  be  taken  at  the  faces  of  the  columns  or  pedestals.  For  footings  under  metallic 
column  bases,  the  critical  section  should  be  assumed  midway  between  the  face  of  the 
column  and  the  edge  of  the  metallic  base.  The  transverse  reinforcement  should  be  divided 
into  groups  proportionate  in  sectional  area  to  the  column  loads.  The  transverse  rein- 
forcement at  each  column  should  be  placed  uniformly  within  a  band  having  a  width  not 
greater  than  the  width  of  the  column  plus  twice  the  effective  depth  of  the  footing. 
Longitudinal  reinforcement  should  be  distributed  over  the  whole  width. 

(b)  The  critical  sections  for  diagonal  tension  in  combined  footings  should  be  taken 
at  the  faces  of  the  supported  members  for  all  beam  elements  and  also  for  all  projecting 
cantilevers. 

869.  Raft  Foundation 

A  raft  foundation  should  be  designed  as  an  inverted  floor  system. 


Footings 97 

870.  Transfer  of  Stress  at  Base  of  Column 

(a)  The  compressive  stress  in  the  longitudinal  reinforcement  at  the  base  of  the  col- 
umn should  be  transferred  to  a  pedestal  or  to  a  footing  by  extending  the  bars  into  the 
pedestal  or  footing  or  by  the  use  of  dowels.  There  should  be  at  least  one  dowel  for  each 
column  bar,  and  the  total  sectional  area  of  the  dowels  should  be  not  less  than  the  sec- 
tional area  of  the  longitudinal  reinforcement  in  the  column.  The  dowels  or  column  bars 
should  extend  into  the  column,  and  into  the  pedestal  or  footing  the  distance  required  to 
transfer  to  the  concrete,  by  allowable  bond  stresses,  their  full  working  strength.  Hooks 
should  not  be  considered  as  adding  to  bond  resistance  in  compression.  In  addition  to  the 
provision  for  the  transference  of  load  by  dowels  there  should  be  provided  at  the  top  of 
the  footing  or  pedestal  an  area  (A)  which  is  equal  to  or  greater  than  that  given  by  the 
following  formula: 


=[:^I- 


(18) 


Wherein    /b  =  allowable  working  stress  on  the  concrete  in  the  column. 
A'  ■==  area  of  the  column, 
/e  =  ultimate  compressive  strength  of  the  concrete  in  the  supporting  member. 

In  all  cases  the  concrete  in  the  supporting  member  should  be  of  such  quality  that  the 
ratio  of  /b  to  .25/^  does  not  exceed  IJ^. 

(b)  In  sloped  or  stepped  footings,  A  may  be  taken  as  the  area  of  the  uppermost 
horizontal  surface  of  the  footing  or  as  the  area  of  the  lower  base  of  the  largest  frustum 
of  a  pyramid  or  cone  contained  wholly  within  the  footing  and  having  for  its  upper  base 
the  loaded  area  A'  and  having  side  slopes  of  1  vertical  to  2  horizontal. 

(c)  Formula  (18)  may  be  applied  to  determine  the  area  required  at  the  top  of  the 
footing  or  pedestal  under  a  metal  base.  In  this  case  /b  is  to  be  taken  as  the  actual  bear- 
ing stress  over  the  loaded  area,  and  the  limitation  given  in  (a)  for  the  quality  of  concrete 
should  apply. 

871.  Concentrically  Loaded  Pedestals  and  Pedestal  Footings 

Plain  Concrete. — (a)  The  compressive  stress  on  the  gross  area  of  a  pedestal  or  the 
upper  surface  of  a  pedestal  footing  should  not  exceed  0.25/c  unless  reinforcement  is  pro- 
vided and  the  member  is  designed  as  a  reinforced  concrete  column. 

(b)  The  depth  and  width  of  a  pedestal  or  pedestal  footing  should  be  determined  by 
consideration  of  shear  and  bending  stresses  as  outlined  under  plain  concrete  footings 
(Sec.  867).  A  pedestal  footing  supported  directly  on  piles  should  have  a  mat  of  re- 
inforcing, of  cross-sectional  area  not  less  than  0.20  sq.  in  per  ft.  in  each  direction,  placed 
3  in.  above  the  top  of  the  piles. 

Retaining  Walls 

872.  Investigation  of  Stability 

(a)  Retaining  walls,  both  plain  and  reinforced  concrete,  should  be  designed  to  resist 
the  pressures  of  the  retained  material  including  both  dead  and  live  load  surcharge  to 
which  they  may  be  subjected. 

(b)  The  wall  should  be  designed  for  stability  against  (1)  overturning,  (2)  sliding, 
(3)  maximum  soil  pressure,  as  well  as  for  moment,  shear,  bond,  and  maximum  pressure 
at  sections  of  the  wall  at  regular  intervals  of  height. 


98 Report    on    Concrete    and    Reinforced    Concrete 

873.  Moments  and  Pressures 

(a)  The  pressures  and  overturning  moments  exerted  by  the  retained  material  and 
the  surcharge  thereon,  if  not  determined  experimentally,  should  be  determined  by  means 
of  analysis  conforming  with  accepted  practice.* 

(b)  Where  a  retaining  wall  is  subjected  to  the  various  pressures  of  different  mate- 
rials along  its  height,  each  height  of  wall  should  be  analyzed  for  the  filling  material 
behind  it,  the  material  above  each  plane  considered  being  computed  as  surcharge. 

874.  Foundation  Pressures 

Foundation  pressures  should  be  determined  from  the  consideration  of  the  location, 
magnitude,  and  direction  of  the  resultant  thrust  at  the  base. 

875.  Allowable  Unit  Stresses  and  Critical  Sections 

(a)  Retaining  walls,  including  footings,  both  plain  and  reinforced,  should  be  so 
designed  that  at  no  section  or  part  of  wall  or  footing  should  the  allowable  stresses  for 
shear,  bond,  compression  or  tension  as  provided  in  Sec.  878  be  exceeded. 

(b)  Critical  sections  in  the  various  parts  of  the  wall  or  footing  should  be  taken  as 
those  recommended  for  beams,  slabs,  and  footings. 

876.  Provisions  for  Stability 

(a)  For  stability  against  sliding,  resistance  should  be  provided  for  at  least  twice  the 
computed  active  horizontal  thrust  on  the  wall. 

(b)  For  stability  against  overturning,  the  righting  moment  of  the  weight  of  the 
wall,  fill,  and  other  superimposed  loads  should  be  at  least  SO  percent  greater  than  the 
overturning  moment  due  to  the  thrust  of  the  filling  material  together  with  that  due  to 
any  dead  load  or  live  load  surcharge.  For  walls  resting  on  soils,  the  resultant  pressure 
at  the  base  should  fall  within  the  middle  third  of  the  base;  and  where  vibration  occurs, 
near  the  center  of  the  base,  to  reduce  unequal  settlement. 

(c)  The  maximum  soil  pressure  resulting  from  the  maximum  thrust  at  the  bottom  of 
the  footing  inclusive  of  the  effect  of  eccentricity  of  such  thrust  should  not  be  greater 
than  the  permissible  bearing  power  of  the  soil  which  supports  the  wall.  Consideration 
should  be  given  to  a  possible  redistribution  of  the  soil  pressure  due  to  such  eccentricity 
and  to  the  effect  of  possible  vibration  on  such  eccentricity  and  the  resulting  unequal 
settlement. 


877.  Details  of  Design  and  Construction 

(a)  In  counterforted  walls  the  counterforts  may  be  designed  as  T-beam  sections  and 
the  vertical  wall  computed  as  a  continuous  slab  and  so  reinforced.  Properly  anchored 
stirrups  or  tie  bars  should  be  provided  of  required  size  and  spacing  to  resist  the  earth 
thrust  or  soil  pressure  transferred  by  the  slabs  (wall  or  footing)  to  the  counterforts. 

(b)  In  buttressed  walls  the  buttresses  should  be  designed  as  rectangular  beams  and 
the  vertical  walls  should  be  designed  as  a  continuous  slab  reinforced  for  continuity. 

(c)  In  designing  the  wall  footing,  consideration  should  be  given  to  the  necessity  of 
tying  the  footing  slab  to  the  heel  of  the  wall  by  adequate  reinforcement  when  the  down- 
ward pressure  of  the  fill  and  the  weight  of  concrete  exceed  the  upward  pressure  of  the  soil. 
Where  keys  into  the  foundation  are  provided  for  resistance  against  sliding  or  for  other 
reasons,  they  should  be  placed  monolithically  with  the  base. 


i 


*  Where  the  source  of  filling  material  is  known  in  advance,  investigation  should  be  made  of  its  unit 
weight,  its  angle  of  internal  friction  under  various  conditions  of  saturation  and  height.  Consideration 
should  be  given  to  possible  hydrostatic  pressure  and  the  reduction  of  weight  of  the  filling  material  due 
to  buoyancy. 


Unit    Stresses  99 


(d)  Longitudinal  reinforcement  for  volume  changes  due  to  shrinkage  and  to  changes 
in  temperature  should  be  provided  in  all  reinforced  concrete  walls  near  the  exposed  face 
to  an  amount  of  not  less  than  0.50  sq.  in.  area  per  ft.  of  height  with  a  maximum  spacing 
of  bars  of  12  in.  center  to  center.* 

(e)  No  reinforcement  should  be  less  than  two  inches  from  any  exposed  face  of  the 
wall.  Where  concrete  is  in  contact  with  soil,  the  reinforcement  should  be  at  least  three 
inches  from  the  surface. 

(f)  In  reinforced  concrete  walls  vertical  construction  joints  with  "V"  notches  at  the 
face  should  be  provided  at  sections  preferably  not  over  30  ft.  apart,  with  reinforcement 
carried  through  the  joint.  Expansion  joints  with  grooved  lock  joints  should  be  provided 
not  more  than  100  ft.  apart  for  reinforced  concrete  walls;  reinforcement  should  not  be 
carried  through  expansion  joints.  In  plain  concrete  walls  similar  expansion  joints  should 
be  provided,  preferably  not  more  than  30  ft.  apart. 

(g)  Construction  and  expansion  joints  in  the  coping  and  balustrade  of  retaining 
walls  should  be  placed  over  all  joints  in  the  walls.  Additional  joints  in  balustrade  and 
copings  may  be  desirable. 

(h)  Drainage  should  be  provided  at  the  backs  of  retaining  walls,  preferably  by  the 
use  of  layers  of  broken  stone  extending  horizontally  for  the  full  length  of  the  wall  at  an 
elevation  where  water  can  readily  be  disposed  of,  together  with  vertical  layers  extending 
up  to  the  coping  at  intervals  of  about  15  ft.  along  the  wall.  Weep  holes  at  least  4  in.  in 
diameter  should  be  provided  about  15  ft.  apart,  or  at  least  one  in  each  panel  of  a 
counterforted  wall,  at  such  elevation  that  the  drainage  water  may  readily  escape. 

(i)  Exposed  faces  of  walls  should  be  given  a  slight  batter  (about  Vi  in.  to  1  ft.)  to 
avoid  appearance  of  tilting. 

Unit  Stresses 
878.  Allowable  Working  Stresses  in  Concrete  and  in  Reinforcement 

(a)  The  recommended  unit  stresses  for  concrete  are  based  on  the  ultimate  com- 
pressive strength,  /'.,  of  the  concrete  at  28  days.  The  methods  of  control,  proportioning, 
and  curing  required  to  obtain  the  desired  strength  are  given  in  Chapter  III. 

(b)  The  recommended  working  stresses  in  the  steel  reinforcement  are  based  on  the 
consideration  of  two  important  factors: 

1.  The  yield  point  of  the  steel. 

2.  The   extent   to   which   cracks  may   develop   on   the   tension   face   of   flexural 
members. 

The  values  given  for  tension  are  limited  to  approximately  50  percent  of  the  yield 
point  of  the  reinforcement,  but  with  an  upper  limit  of  20,000  p.s.i.  for  important  struc- 
tural members,  and  25,000  p.s.i.  for  the  special  case  of  one-way  slabs  reinforced  with 
wire  mesh  and  small  size  bars.  These  upper  limits  are  to  apply  for  all  grades  of 
reinforcement  regardless  of  yield  point. 

(c)  Static  and  Impact  Loads.- — For  static  loads  or  for  moving  loads  where  appro- 
priate allowances  have  been  made  for  impact,  the  committee  recommends  the  unit 
stresses  given  in  Table  7. 

(d)  Maximum  Combined  Stresses. — Where  stresses  due  to  wind,  earthquake,  or 
other  unusual  forces,  are  combined  with  those  due  to  static  or  impact  loads,  the  sum  of 
the  stresses  should  not  exceed  the  allowable  values  given  in  Table  7  by  more  than 
one-third. 


It  is  desirable  to  use  bars  of  small  section  and  close  spacing  for  this  purpose. 


100 


Report   on    Concrete   and   Reinforced    Concrete 


Table  7 — Recommended  Working  Stresses   (Static  and  Impact  Loads) 


Modular^  Ratio:  n  for  use  in  flexural  calculations 
involving  percentage  of  tensile  steel,  or  tensile 
stress  in  the  reinforcement.  The  values  given  are 
for  concrete  made  from  normal  weight  aggregates: 
for  lightweight  concrete,  the  values  of  n  should  be 
double  those  shown. 


/'c  = 


2,000—2,400 
2,500—2,900 
3,000—3,900 
4,000—4,900 
above  5,000 


=15 
=12 
=10 


Concrete 


Flexure:  fc 

Extreme  fiber  stress  in  compression /c=0. 45/'c 

Extreme  fiber  stress  in  tension  (for  plain  concrete  footings  only) fc^=O.OSf'c 

Shear:  v 

Beams  without  web  reinforcement  and  without  end  anchorage  of  longi- 
tudinal steel i,,-=0.  02/'c 

Beams  without  web  reinforcement  but  with  end  anchorage  of  longi- 
tudinal steel vc=0.03f'c 

Beams  with  properly  designed  web  reinforcement,  but  without  end  an- 
chorage of  longitudinal  steel i;c=0.  06/'c 

Beams  with  properly  designed  web  reinforcement  and  with  end  anchor- 
age of  longitudinal  steel  (when  vc,  is  in  excess  of  0.06/'c  web  reinforce- 
ment should  provide  for  total  shear  (see  Sec.  817(e) ) vc=^0. 12/'c 

Flat  slabs  at  distance  d  from  edge  of  column  capital,  or  dropped  panel.  _z;c=0.  03/'c 

Footings  with  longitudinal  bars  having  no  end  anchorage i;c=0.  02/'c 

Footings  with  longitudinal  bars  having  end  anchorage vc=0 .  OSf'c 

Combined  footings  and  raft  foundations  designed  as  beam  elements 
with  properly  designed  web  reinforcement  and  end  anchorage vc=0.  06/'<: 

Bond:  u 

In  beams  and  slabs  and  one-way  footings: 

Plain  bars u=0.  04/'c  but  not  to  exceed  160  p.s.i. 

Deformed  bars u=0.  05/ 'c  but  not  to  exceed  200  p.s.i. 

In  multiple-way  footings: 

Plain  bars u^O.  03/ 'c  but  not  to  exceed  160  p.s.i. 

Deformed  bars u=0.  0375/ 'c  but  not  to  exceed  200  p.s.i. 

(When  end  anchorage  is  provided  (see  Sec.  826),  one  and  one-half 

times  these  values  in  bond  may  be  used,  but  in  no  case  to  exceed 

200  p.s.i.  for  plain  bars  and  250  p.s.i.  for  deformed  bars.) 


Bearing:  fc 

Full  area  loaded fc=0.25f'c 

Load  on  partial  area, /c  variable  (see  Sec.  870),  maximum fc=0.  375/'c 

Axial  Compression: 

In  Pedestals /c=0.25/'c 

In  Columns  (see  Sec.  854-855) 


Unit    Stresses 101 

Table  7 — Recommended  Working  Stresses  (Static  and  Impact  Loads) — Continued 

Reinforcement 

Tension  in  Flexural  Members,  with  or  without  axial  loads: 

Structural  grade  steel  bars /^^IS.OOO  p.s.i. 

Structural  steel  shapes /i^l8,000  p.s.i. 

Intermediate  grade  steel  bars,  and  hard-grade  bars  (billet  steel, 

rail  steel,  or  axle  steel) /i=20,000  p.s.i. 

Wire  mesh  or  bars  not  exceeding  3^  in.  in  diameter  when  used  in 

one-way  solid  slabs  only /s=50%  of  min.  yield  point,  but  not 

to  exceed  25,000  p.s.i. 

Tension  in  Web  Reinforcement: 
All  grades  of  steel 7^=16,000  p.s.i. 

Tension  in  Column  Spirals  (see  Sec.  854) 

Compression  in  Column  Verticals  (see  Sec.  854) 

Intermediate  grade  steel  bars /i=l 6,000  p.s.i. 

Hard-grade  steel  bars  (billet  steel,  rail  steel,  or  axle  steel) /i=20,000  p.s.i. 

Compression  in  Composite  and  Combination  Columns  (see  Sec.  856-857) 

Compressive  Reinforcement  in  Flexural  Members  (see  Sec.  804(c)) 


k 


102 Report    on    Concrete    and    Reinforced    Concrete 

Standard  Specifications 
for  Concrete  and  Reinforced  Concrete 

Materials 

Cement 

The  cement  to  be  used  shall  be  one  or  more  of  the  following  types  as  designated 
by  the  Engineer. 

201-S.  Portland  Cement 

Normal  Portland  cement  shall  conform  to  the  Standard  Specifications  for  Portland 
Cement  of  the  American  Society  for  Testing  Materials  (C9-38). 

202-S.  High  Early  Strength  Portland  Cement 

High  early  strength  Portland  cement  shall  conform  to  Standard  Specifications  of  the 
American  Society  for  Testing  Materials  (C74-39). 

203-S.  Special  Cements 

Special  cements  shall  conform  to  the  following  requirements:  (See  Recommended 
Practice— Sec.  202). 

Admixtures 
204-S.  General 

Materials  used  as  admixtures  shall  conform  to  the  following  requirements:  (see 
Recommended  Practice — Sec.  203). 

Water 
205-S.  General 

Water  for  concrete  shall  be  clean  and  free  from  injurious  amounts  of  oil,  acid, 
alkali,  organic  matter,  or  other  deleterious  substances. 

206-S.  Mortar  Strength 

When  subjected  to  the  mortar  strength  test  (see  Sec.  229-S  for  method  of  test)  the 
strength  at  28  days  of  mortar  specimens  made  with  the  water  under  examination  and 
normal  Portland  cement  shall  be  at  least  90  percent  of  the  strength  of  similar  specimens 
made  with  the  same  cement  and  with  water  of  known  satisfactory  quality.  (See  Recom- 
mended Practice — Sec.  204.) 

Fine  Aggregate 
207-S.  General 

Fine  aggregate  shall  consist  of  natural  sand,  sand  prepared  from  the  product  ob- 
tained by   crushing  stone,   gravel,   or   air-cooled   blast-furnace   slag;    or,   subject   to   thej 
approval  of  the  Engineer,  other  inert  materials  having  similar  characteristics.  The  par- 
ticular type  or  types  to  be  furnished  shall  be  specified  by  the  Engineer.  (See  also  Secj 
226-S  to  228-S.) 

208-S.  Grading 

Fine  aggregate  shall  be  graded  from  coarse  to  fine  within  the  limits  shown  in  the 
following  table.   (See  Recommended  Practice,  Sec.  20S  and  206.) 


Materials 103 

Total  Passing 

Sieve  Size  %  by  Weight 

^gin 100 

No       4                                                                           95-100 

No.    16   45-80 

No.    50          .                     5-30 

No.  100 0-8 

209-S.  Uniformity 

For  the  purpose  of  controlling  the  grading  of  fine  aggregate  from  any  one  source,  a 
preliminary  sample  shall  be  submitted  prior  to  actual  deliveries.  This  sample  shall  be 
representative  of  the  material  which  it  is  proposed  to  furnish.  Any  shipment  of  fine 
aggregate  made  during  the  progress  of  the  work  which  shows  a  variation  in  fineness 
modulus  greater  than  0.20  either  way  from  the  fineness  modulus  of  the  preliminary 
sample  shall  be  rejected  or,  at  the  option  of  the  Engineer,  may  be  accepted  subject  to 
such  changes  in  concrete  proportions  as  may  be  necessary  by  reason  of  failure  to  comply 
with  the  requirements  of  this  section. 

210-S.  Deleterious  Substances 

Deleterious  substances  shall  not  be  present  in  excess  of  the  amounts  shown  in  the 
table  below  (see  Recommended  Practice,  Sec.  205  and  208). 

Permissible  Limits 
%  by  Weight 
Recommended  Maximum 

Clay  lumps 1                                IJ^ 

Coal  and  lignite 34                          1 

Material  finer  than  No.  200  sieve 

(a)  In  concrete  subject  to  surface  abrasion 2                              3 

(h)  All  other  classes  of  structures 3                              5 

Other  deleterious  substances  (as  may  be 
specified) 

211-S.  Organic  Impurities 

The  fine  aggregate  when  tested  in  accordance  with  the  method  of  test  for  organic 
impurities  (see  Sec.  229-S(c))  shall  show  a  color  not  darker  than  the  standard  color 
unless  the  material  complies  with  the  mortar  strength  test  specified  in  Sec.  212-S. 

212-S.  Mortar  Strength 

Mortar  specimens  made  with  the  fine  aggregate  when  tested  in  accordance  with  the 
mortar  strength  test  (see  Sec.  229-S)  shall  have  an  average  compressive  strength  of  at 
least  90  percent  of  the  strength  of  similar  specimens  made  with  the  same  cement  and 
Ottawa  sand  graded  as  specified  in  ASTM  Tentative  Method  of  Test  for  Compressive 
Strength  of  Portland  Cement  Mortars  (ASTM  Designation:  C 109-3 7T)  when  tested  at 
an  age  of  not  less  than  seven  days  when  normal  Portland  cement  is  used  and  not  less 
than  three  days  when  high  early  strength  cement  is  used.* 

213-S.  Soundness 

(a)  The  fine  aggregate  when  subjected  to  five  alternations  of  the  sodium  sulfate 
soundness  test  (see  Sec.  229-S)  shall  conform  to  the  following  requirements:  (See  Rec- 
ommended Practice,  Sec.  205  and  209). 


•Note:  The  above  requirements  are  intended  to  assure  the  use  of  fine  aggregate  of  satisfactory 
quality  from  the  standpoint  of  concrete  strength.  The  10  percent  tolerance  is  allowed  to  cover  unavoid- 
able variations  in  normal  testing  procedure. 


104 


Report   on    Concrete   and   Reinforced   Concrete 


Average  weighted  loss, 


Permissible  Limits 
Per  Cent 
Recommended  Maximum 

8  12 


(b)  Fine  aggregate  failing  to  meet  the  requirement  shown  in  (a)  above  may  be 
accepted,  provided  it  is  shown  by  evidence  satisfactory  to  the  Engineer  that  concrete  of 
comparable  proportions  made  from  similar  aggregate  from  the  same  source  has  been 
exposed  to  natural  weathering  for  a  period  of  at  least  five  years  without  appreciable 
disintegration. 

(c)  The  requirements  for  soundness  given  in  (a)  and  (b)  above  may  be  waived  in 
the  case  of  aggregate  for  use  in  structures  or  portions  of  structures  not  exposed  to 
weathering. 


Coarse  Aggregate 


214-S.  General 


Coarse  aggregate  shall  consist  of  crushed  stone,  gravel,  air-cooled  blast-furnace  slag, 
or,  subject  to  the  approval  of  the  Engineer,  other  inert  materials  having  similar  char- 
acteristics. The  particular  type  or  types  to  be  furnished  shall  be  specified  by  the 
Engineer.  (See  also  Sec.  220-S  to  22S-S.) 

215-S.  Grading 

Coarse  aggregate  of  the  sizes  designated  shall  conform  to  the  following  requirements: 


Designated 
Sizes 

Percentage  by  Weight  Passi 
Having  Square 

ng  Laboratory  Sieves 
Openings 

4- 
In. 

3H- 
In. 

2K-        2- 
In.         In. 

In. 

1- 
In. 

In. 

K- 

In. 

In. 

No. 
4 

No. 
8 

No.  4-)^  in. 

100 
90-100 

35-70" 

'o-i5" 

90-100 
25-60" 

io-3o' 

40-75 
20-55 

10^30 

0-15 

0-10 

0-10 

0-5 

0-5 

0-5 

No.  4-M  in. 

100 
90-100 

35-70' 

20-55 

0-15 

0-5 

No.  4-1  in. 

100 
95-100 

90-ioo 

35-70 

No.  4-11^  lin. 

100 
95-100 

100 
90-100 
0-15 

No.  4-2  in.. 

100 

M-IK  in.-- 

1-2  in 

100 

2-3 Kin.  - 

100 

90-100 

• 

216-S.  Deleterious  Substances 

Deleterious   substances  shall   not   be   present   in   excess   of    the   following   amounts: 
(See  Recommended  Practice,  Sec.  205  and  208) . 

Permissible  Limits 

%  by  Weight 

Recommended  Maximum 

Soft  fragments 2  5 

Coal  and  lignite 34  1 

Clay  lumps }4  H 

Material  finer  than  No.  200  sieve J^*  1* 

Other  deleterious  substances  (as  may  be 

specified) 


_*Note:  When   the   material   finer  than   the  No.    200  sieve   consists   essentially   of   crusher  dust   the 
maximum  amounts  permitted  may  be  raised  to  J4  ^"d  1  yi  percent,  respectively. 


Materials  105 

217-S.  Soundness 

(a)  The  coarse  aggregate  when  subjected  to  five  alternations  of  the  sodium  sulfate 
test  (see  Sec.  229-S)  shall  conform  to  the  following  requirement:  (see  Recommended 
Practice,  Sec.  205  and  209). 

Permissible  Limits 
Percent 
Recommended  Maximum 

Average  weighted  loss 12  15 

(b)  Coarse  aggregate  failing  to  meet  the  requirement  shown  in  (a)  above  may  be 
accepted,  provided  it  is  shown  by  evidence  satisfactory  to  the  Engineer  that  concrete  of 
comparable  proportions  made  from  similar  aggregate  from  the  same  source  has  been 
exposed  to  natural  weathering  for  a  period  of  at  least  five  years  without  appreciable 
disintegration. 

(c)  The  requirements  for  soundness  given  in  (a)  and  (b)  above  may  be  waived  in 
the  case  of  aggregate  for  use  in  structures  or  portions  of  structures  not  exposed  to 
weathering. 

218-S.  Weight  per  Cubic  Foot  of  Slag 

Blast-furnace  slag  graded  as  used  shall  meet  the  following  requirements:  (See 
Recommended  Practice,  Sec.  205) . 

Recommended  Permissible  Minimum  Permissible 

Limits  Limits 

Concrete  Concrete  Concrete           Concrete 

subject  to  not  subject  subject  to        not  subject 

surface  to  surface  surface           to  surface 

abrasion  abrasion  abrasion           abrasion 

Weight,  lb.  per  cu.  ft., 

not  less  than 75                    70  70  65 

219-S.  Resistance  to  Abrasion 

Crushed  stone  and  gravel  to  be  used  in  concrete  subject  to  surface  abrasion,  such 
as  pavements,  heavy  duty  floors,  structures  subjected  to  the  abrasive  action  of  floating 
ice,  etc.,  shall  meet  the  following  requirements  for  abrasion  loss  when  tested  for  resistance 
to  abrasion  (See  Sec.  229-S).  (See  Recommended  Practice,  Sec.  212.) 

Permissible  Limits 

%  by  Weight 

Material                                          Recommended  Maximum 

Crushed  stone 5  9 

Gravel  (100  per  cent  uncrushed) 10  20 

Gravel  (100  per  cent  crushed) 20  30 

Gravel  ( per  cent  crushed) 

Rubble  and  Cyclopean  Aggregate 

220-S.  Rubble  Aggregate 

Rubble  aggregate  shall  consist  of  clean,  hard,  durable  stone  or  gravel  retained  on  a 
6-in.  square  opening  and  with  individual  particles  weighing  not  more  than  100  lb. 

221-S.  Cyclopean  Aggregate 

Cyclopean  aggregate  shall  consist  of  clean,  hairl,  durable  stone  or  gravel  with  indi- 
vidual particles  weighing  more  than  100  lb. 


106 Report    on    Concrete    and    Reinforced    Concrete 

Aggregates  for  Lightweight  Concrete 
222-S.  General 

Lightweight  aggregates  shall  consist  of  pumice,  lava,  tufa,  cinders,  specially  prepared 
slag,  coke,  burnt  clay,  or  other  products  having  similar  characteristics.  Lightweight  aggre- 
gates shall  conform  to  the  requirements  of  the  general  specifications  for  grading  (Sec. 
208-S  to  21S-S),  organic  impurities  (Sec.  211-S),  soundness  (Sec.  213-S),  and  for 
mortar  strength,  as  specified  in  Sec.  212-S,  except  that  the  minimum  strength  of  the  light- 
weight aggregate  mortar  made  with  aggregate  in  a  saturated  and  surface  dry  condition 
shall  be  at  least  70  percent  of  that  of  Ottawa  sand  mortar.  (See  Recommended  Practice, 
Sec.  210.) 

223-S.  Deleterious  Substances 

Lightweight  aggregates  shall  conform  to  the  following  requirements:  (See  Sec. 
229-S  for  method  of  test). 

Fine  Aggregate     Coarse  Aggregate 

Percent  Percent 

Clay  lumps,  not  more  than 1,5  1.0 

Coal,  not  more  than 1.5*  1.5* 

Material  finer  than  No.  200  sieve,  not  more  tlian_               4.0  2.0 
Other  deleterious  substances  (as  may  be 

specified) 

224-S.  Weight  per  Cubic  Foot 

Lightweight  aggregates  shall  meet  the  following  requirements  (See  Sec.  210,  Recom- 
mended Practice) : 

Pounds 
Maximum  weight  per  cubic  foot,  dry  and  loose. 

Fine  aggregate 70 

Coarse  aggregate   55 

Aggregates  for  Use  in  Fireproofing 
225-S.  Fireproofing  Aggregate 

(a)  Aggregates  meeting  the  requirements  of  Sec.  207-S  to  219-S,  inclusive,  or  Sec. 
222^  to  224-S,  inclusive,  of  these  specifications  are  suitable  for  use  in  fireproof  con- 
struction. When  used  in  fireproof  construction  they  shall  be  divided  into  two  groups  as 
follows: 

Group  1. — -Blast-furnace  slag,  limestone,  calcareous  gravel,  trap  rock,  burnt  clay  or 
shale,  cinders  containing  not  more  than  25  percent  of  combustible  material  and  not  more 
than  5  percent  of  volatile  material,  and  other  materials  meeting  the  requirements  of  these 
specifications  and  containing  not  more  than  30  percent  of  quartz,  chert,  flint,  and  similar 
materials. 

Group  2. — Granite,  quartzite,  siliceous  gravel,  sandstone,  gneiss,  cinders  containing 
more  than  25  percent,  but  not  more  than  40  percent  of  combustible  material  and  not 
more  than  5  percent  of  volatile  material  and  other  materials  meeting  the  requirements  of 
these  specifications,  and  containing  more  than  30  percent  of  quartz,  chert,  flint  and 
similar  materials. 

(h)  The  fire  protection  requirements  shown  on  the  drawings  are  based  on  the  use 
of  aggregates  in  Group  1, — Group  2.** 


*  Shall  not  apply  to  aggregate  derived  from  coal   (cinders,  coke,  etc.). 

**  The  Engineer  shall  strike  out  one  of  the  two  groups  indicated.  See  Recommended  Practice  Sec.  505 
for  recommendations  regarding  minimum  protection  of  reinforcement  when  using  aggregates  of  either 
group. 


____^ Methods    of    Sampling     and   Testing lO^ 

Methods  of  Sampling  and  Testing 

226-S.  Methods  of  Sampling 

Methods  of  sampling  Portland  cement  and  high  early  strength  Portland  cement 
shall  be  in  accordance  with  ASTM  Standard  Methods  of  Samphng  and  Physical  Testing 
of  Portland  Cement  (ASTM  Designation:  C77-39). 

227-S. 

Methods  of  sampling  aggregates  shall  be  in  accordance  with  ASTM  Tentative 
Methods  of  Sampling  Stone,  Slag,  Gravel,  Sand  and  Stone  Block  for  Use  as  Highway 
Materials  Including  Some  Material  Survey  Methods  (ASTM  Designation:   D75-39T). 

228-S.  Methods  of  Testing 

Portland  cement  and  high  early  strength  Portland  cement  shall  be  tested  in  accord- 
ance with  ASTM  Standard  Methods  of  Sampling  and  Physical  Testing  of  Portland  cement 
(ASTM  Designation:  C77-39). 

229-S. 

Fine  and  coarse  aggregate  shall  be  tested  in  accordance  with  the  following: 

(a)  Grading.— ASTM  Standard  Method  of  Test  for  Sieve  Analysis  of  Fine  and 
Coarse  Aggregate  (ASTM  Designation:  C136-39). 

(b)  Uniformity  of  Grading — Fineness  Modulus. — The  fineness  modulus  of  the  aggre- 
gate shall  be  determined  by  adding  the  total  percentages  retained  on  the  following  U.  S. 
Standard  sieves  and  divicUng  by  100:  3-in.,  1^-in.,  ^-in.,  ^-in.,  No.  4,  No.  8,  No.  16, 
No.  30,  No.  SO,  and  No.  100. 

(c)  Organic  Impurities. — ASTM  Standard  Method  of  Test  for  Organic  Impurities  in 
Sands  for  Concrete  (ASTM  Designation:  C40-33). 

(d)  Coal  and  Lignite.— ASTM  Standard  Method  of  Test  for  Coal  and  Lignite  in 
Sand  (ASTM  Designation:  C123-39). 

(e)  Fineness. — ASTM  Standard  Method  of  Test  for  Amount  of  Material  Finer  than 
No.  200  Sieve  in  Aggregates  (ASTM  Designation:  C117-37). 

(f)  Clay  Lumps. — The  percentages  of  clay  lumps  shall  be  determined  by  examining 
the  various  fractions  which  remain  after  the  test  for  grading.  Any  particles  that  can  be 
broken  up  with  the  fingers  shall  be  classified  as  clay  lumps  and  the  total  percentages  by 
weight  of  all  clay  lumps  shall  be  determined  on  the  basis  of  the  total  original  weight  of 
the  sample. 

(g)  Mortar  Strength.— ASTM  Standard  Method  of  Test  for  Structural  Strength  of 
Fine  Aggregate  Using  Constant  Water-Cement-Ratio  Mortar  (ASTM  Designation: 
C87-39). 

(h)  Soundness — Fine  and  Coarse  Aggregate. — ASTM  Tentative  Method  of  Test  for 
Soundness  of  Aggregates  by  Use  of  Sodium  Sulfate  or  Magnesium  Sulfate  (ASTM  Desig- 
nation: C88-39T). 

(i)  Resistance  to  Abrasion 

1.  Stone. — ASTM  Standard  Method  of  Test  for  Abrasion  of  Rock  by  Use  of  the 
Deval  Machine  (ASTM  Designation:  D2-33). 

2.  Gravel.— ASTM  Tentative  Method  of  Test  for  Abrasion  of  Gravel  by  Use 
of  the  Deval  Machine  (ASTM  Designation:  D289-37T). 

(j)  Weight  per  Cubic  Foot  of  Slag.— ASTM  Standard  Method  of  Test  for  Unit 
Weight  of  Aggregate  (ASTM  Designation:  C29-39). 


104 


Report    on    Concrete   and   Reinforced    Concrete 


Average  weighted  loss. 


Permissible  Limits 
Per  Cent 
Recommended  Maximum 

8  12 


(b)  Fine  aggregate  failing  to  meet  the  requirement  shown  in  (a)  above  may  be 
accepted,  provided  it  is  shown  by  evidence  satisfactory  to  the  Engineer  that  concrete  of 
comparable  proportions  made  from  similar  aggregate  from  the  same  source  has  been 
exposed  to  natural  weathering  for  a  period  of  at  least  five  years  without  appreciable 
disintegration. 

(c)  The  requirements  for  soundness  given  in  (a)  and  (b)  above  may  be  waived  in 
the  case  of  aggregate  for  use  in  structures  or  portions  of  structures  not  exposed  to 
weathering. 


Coarse  Aggregate 


214-S.  General 


Coarse  aggregate  shall  consist  of  crushed  stone,  gravel,  air-cooled  blast-furnace  slag, 
or,  subject  to  the  approval  of  the  Engineer,  other  inert  materials  having  similar  char- 
acteristics. The  particular  type  or  types  to  be  furnished  shall  be  specified  by  the 
Engineer.  (See  also  Sec.  220-S  to  225-S.) 

215-S.  Grading 

Coarse  aggregate  of  the  sizes  designated  shall  conform  to  the  following  requirements: 


Designated 
Sizes 

Percentage  by  Weight  Passi 
Having  Square 

ng  Laboratory  Sieves 
Openings 

4- 
In. 

3K- 
In. 

2y2-        2- 
In.         In. 

In. 

1- 
In. 

In. 

In. 

Vs- 
In. 

No. 
4 

No. 
8 

No.  4-J^  in. 

100 
90-100 

35-70" 

"o-i5" 

90-100 
25^60" 

io-3o" 

40-75 
20-55 

i0^30 

0-15 

0-10 

0-10 

0-5 

0-5 

0-5 

No.  4-M  in. 

100 
90-100 

35-70" 

20-55 

0-15 

0-5 

No.  4-1  in. 

100 
95-100 

90-100 
35-70 

No.  4-li^lin. 

100 
95-100 

100 
90-100 
0-15 

No.  4-2  in- 

100 

H-'^H  in.-- 

1-2  in 

100 

2-33^  in... 

100 

90-100 

216-S.  Deleterious  Substances 

Deleterious   substances  shall   not   be   present   in   excess   of    the   following   amounts: 
(See  Recommended  Practice,  Sec.  205  and  208) . 

Permissible  Limits 

%  by  Weight 

Recommended  Maximum 

Soft  fragments 2  5 

Coal  and  lignite M  1 

Claylumps }4  H 

Material  finer  than  No.  200  sieve H*  1* 

Other  deleterious  substances  (as  may  be 

specified) 


♦Note:  When   the   material   finer   than   the  No.    200   sieve   consists   essentially   of  crusher  dust   the 
maximum  amounts  permitted  may  be  raised  to  54  ^"d  1  yi   percent,  respectively. 


Materials 105 

217-S.  Soundness 

(a)  The  coarse  aggregate  when  subjected  to  five  alternations  of  the  sodium  sulfate 
test  (see  Sec.  229-S)  shall  conform  to  the  following  requirement:  (see  Recommended 
Practice,  Sec.  205  and  209). 

Permissible  Limils 
Percent 
Recommended  Maximum 

Average  weighted  loss 12  15 

(b)  Coarse  aggregate  failing  to  meet  the  requirement  shown  in  (a)  above  may  be 
accepted,  provided  it  is  shown  by  evidence  satisfactory  to  the  Engineer  that  concrete  of 
comparable  proportions  made  from  similar  aggregate  from  the  same  source  has  been 
exposed  to  natural  weathering  for  a  period  of  at  least  five  years  without  appreciable 
disintegration. 

(c)  The  requirements  for  soundness  given  in  (a)  and  (b)  above  may  be  waived  in 
the  case  of  aggregate  for  use  in  structures  or  portions  of  structures  not  exposed  to 
weathering. 

218-S.  Weight  per  Cubic  Foot  of  Slag 

Blast-furnace  slag  graded  as  used  shall  meet  the  following  requirements:  (See 
Recommended  Practice,  Sec.  205) . 

Recommended  Permissible  Minimum  Permissible 

Limits  Limits 

Concrete           Concrete  Concrete           Concrete 

subject  to        not  subject  subject  to        not  subject 

surface           to  surface  surface           to  surface 

abrasion           abrasion  abrasion           abrasion 

Weight,  lb.  per  cu.  ft., 

not  less  than 75                    70  70                    65 

219-S.  Resistance  to  Abrasion 

Crushed  stone  and  gravel  to  be  used  in  concrete  subject  to  surface  abrasion,  such 
as  pavements,  heavy  duty  floors,  structures  subjected  to  the  abrasive  action  of  floating 
ice,  etc.,  shall  meet  the  following  requirements  for  abrasion  loss  when  tested  for  resistance 
to  abrasion  (See  Sec.  229-S).  (See  Recommended  Practice,  Sec.  212.) 

Permissible  Limits 

%  by  Weight 

Material                                          Recommended  Maximum 

Crushed  stone 5  9 

Gravel  (100  per  cent  uncrushed) 10  20 

Gravel  (100  per  cent  crushed) 20  30 

Gravel  ( per  cent  crushed) 

Rubble  and  Cvclopean  Aggregate 

220-S.  Rubble  Aggregate 

Rubble  aggregate  shall  consist  of  clean,  hard,  durable  stone  or  gravel  retained  on  a 
6-in.  square  opening  and  with  individual  particles  weighing  not  more  than  100  lb. 

221-S.  Cyclopean  Aggregate 

Cyclopean  aggregate  shall  consist  of  clean,  hard,  durable  stone  or  gravel  with  indi- 
vidual particles  weighing  more  than  100  lb. 


110 Report    on    Concrete    and    Reinforced    Concrete 

305-SA.  Changes  in  Consistency  for  Mechanical  Vibration 

When  high  frequency  mechanical  vibration  is  used  for  compacting  concrete,  the 
limiting  consistencies  in  Table  A  may  be  modified  subject  to  the  approval  of  the  Engineer. 
The  proportions  and  consistencies,  however,  shall  be  such  that  with  the  vibratory  equip- 
ment in  use  the  full  requirements  of  Sec.  304-SA  shall  be  satisfied. 

306-SA.  Changes  in  Proportions  or  Materials  by  the  Engineer 

If,  during  the  progress  of  the  work,  it  is  found  impossible  to  secure  concrete  of  the 
required  workability  and  strength  with  the  materials  being  furnished  by  the  Contractor, 
the  Engineer  may  order  such  changes  in  proportions  or  materials,  or  both,  as  may  be 
necessary  to  secure  the  desired  properties,  subject  to  the  limiting  requirements  shown  in 
Table  A.  Any  changes  so  ordered  shall  be  made  at  the  Contractor's  expense,  and  no  extra 
compensation  will  be  allowed  by  reason  of  such  changes. 

307-SA.  Changes  in  Materials  by  the  Contractor 

If,  during  the  progress  of  the  work,  the  Contractor  desires  to  use  materials  other 
than  those  originally  approved,  or  if  the  materials  from  the  sources  originally  approved 
change  in  characteristics,  he  shall  submit,  for  approval,  evidence  satisfactory  to  the  Engi- 
neer that  the  new  combination  of  materials  will  produce  concrete  meeting  the  require- 
ments shown  in  Table  A,  and  will  not  bring  about  objectionable  changes  in  the  color  or 
appearance  of  the  structure. 

308-SA.  Changes  in  Requirements 

Regardless  of  the  limitations  of  Table  A,  at  any  time  during  the  progress  of  the 
work,  the  owner  shall  have  the  right  to  make  such  changes  in  the  materials  or  propor- 
tions, or  both,  as  he  may  consider  necessary  to  meet  the  requirements  of  the  structure. 
In  such  case,  the  Contractor  shall  be  compensated  in  accordance  with  the  terms  of  the 
contract  for  the  additional  cost  of  materials  and  additional  handUng  and  placing  costs, 
if  any,  entailed  by  changed  materials  or  mixtures,  or  both,  which  are  not  covered  by  the 
specification  requirements  shown  in  Table  A  for  the  respective  portions  of  the  work 
involved. 

309-SA,  Concrete  Made  with  High  Early  Strength  Portland  Cement 

When  high  early  strength  Portland  cement  is  used  in  lieu  of  normal  Portland  cement, 
the  requirements  given  in  Table  A  shall  apply,  except  that  the  "Minimum  allowable 
strength  at  28  days"  specified  for  normal  Portland  cement  shall  be  the  minimum  allow- 
able strength  at  7  days.  The  ages  at  time  of  test  specified  in  Sec.  302-SA  shall  be  3  days 
and  7  days  in  lieu  of  the  7-day  and  28-day  ages  specified  for  normal  Portland  cement. 

Proportioning:  Alternate  B 

Specifications  Based  Primarily  on  Designated  Cement  Content 
301-SB.  Proportions 

All  concrete  shall  be  proportioned  as  indicated  in  Table  B. 
302-SB,  Cement  Factor 

The  cement  factor  given  in  column  3  of  Table  B  indicates  the  weight  of  cement  per 
cubic  yard  of  concrete  when  the  concrete  is  in  a  freshly  mixed  condition.  The  volume  of 
the  freshly  mixed  concrete  shall  be  assumed  to  be  the  absolute  volume  of  the  cement, 
plus  the  volume  of  the  mixing  water,  plus  the  displaced  volumes  of  the  saturated,  surface- 
dry  aggregates.  The  quantity  of  mixing  water  to  be  used  in  this  calculation  shall  not 
include  water  absorbed  by  the  aggregates. 


Proportioning 


111 


Table  B* 


Class 

of 
Con- 

Estimated 
28-Day 

Compres- 
sive 
Flexual 

Strength; 

p.s.i. 

* 

Cement 
Factor 
Sacks 
Cement 
(94  lb.) 
per  cu. 
yd.   Con- 
crete 

Max. 
Water 

per 
94  lb. 

Ce- 
ment; 

Gal. 

Max. 

Size 
Agg.; 

In. 

Fine 

Agg.; 

%  Total 

Agg.  by 

Weight 

(range) 

* 

Slump, 

Range; 

In. 

Approx.  Wt3.  Sat- 
urated Surface-Dry 
Agg.  Per  Sack  (94 

lb.)  of  Cement 
(See  note  A  below) 

Fine 
Agg.  lb. 

Coarse 
Agg.  lb. 

(/) 

(2) 

(3) 

(4) 

(^) 

(6) 

(7) 

(S) 

(9) 

Note  A:  The  approximate  weights  in  columns  8  and  9  have  been  determined  on  the  assumption 
that  the  aggregates  are  in  a  saturated,  surface-dry  condition  and  have  a  bulk  specific  gravity  of  2.65. 

*  The  Engineer  should  fill  in  the  details  of  Table  B  to  indicate  the  characteristics  of  the  concrete 
which  are  desired  for  each  part  of  the  work.  See  Sec.  305  and  307,  Recommended  Practice,  for  sugges- 
tions. The  Engineer  should  strike  out  one  of  the  words  "Flexural"  or  "Compressive"  in  column  2  as 
may  be  required. 


303-SB.  Variations  in  Proportions 

In  order  to  obtain  proper  workability  and  a  smooth,  dense,  homogeneous,  plastic 
mixture,  free  from  segregation,  the  percent  of  fine  aggregate  may  be  varied  within  the 
limits  indicated  with  the  approval  of  the  Engineer.  The  estimated  28-day  strengths  indi- 
cated in  column  2  of  Table  B  are  the  strengths  used  in  the  design  calculations. 

The  Engineer  will  verify  strengths  by  tests  made  during  the  progress  of  the  work 
and  in  accordance  with  the  requirements  of  Sec.  321-S  to  325-S.  When  a  ratio  between 
7-day  and  28-day  strengths  has  been  established  by  these  tests  or  by  preliminary  tests, 
the  7-day  strengths  may  be  taken  as  a  satisfactory  indication  of  the  28-day  strengths. 
In  the  event  that  cement  in  excess  of  that  indicated  in  Table  B  is  necessary  to  produce 
concrete  of  the  indicated  strength  or  workability,  the  cement  factor  shall  be  increased  as 
directed  by  the  Engineer,  and  the  Contractor  shall  receive  extra  compensation  for  the 
additional  cement  so  used.  In  the  event  that  cement  less  than  that  indicated  in  Table  B 
is  sufficient  to  produce  concrete  of  the  indicated  strength  or  workability  the  Engineer 
may  order  a  reduction  in  the  cement  factor,  in  which  case  there  shall  be  an  adjustment 
in  contract  price  equal  to  the  actual  difference  in  cost  to  the  Contractor  of  the  required 
cement  and  aggregates. 

304-SB.  Water  Content  and  Slump  Range 

The  maximum  quantity  of  water  per  94  lb.  of  cement  specified  in  Table  B  shall 
include  the  free  water  in  the  aggregates;  however,  moisture  absorbed  by  the  aggregates 
shall  not  be  included.  The  slump  range  indicated  in  Table  B  is  intended  as  a  guide  to  the 
Contractor  for  the  determination  of  placing  and  compacting  procedures  and  equipment. 
Within  the  range  specified,  the  slump  shall  be  as  directed  by  the  Engineer.  If  the  con- 
crete has  a  greater  slump  than  the  maximum  indicated,  the  quantity  of  water  shall  be 
reduced  to  meet  the  slump  requirements.  If  the  concrete  has  a  smaller  slump  than  the 
minimum  indicated,  changes  in  the  mixture  shall  be  made  as  specified  in  Sec.  303-SB. 

305-SB.  Changes  in  Consistency  for  Mechanical  Vibration 

When  high  frequency  mechanical  vibration  is  used  for  compacting  the  concrete,  the 
proportions  and  consistencies  in  Table  B  shall  be  modified  as  required  to  produce  the 
type  of  concrete  specified  in  Sec.  303-SB  and  304-SB. 


112 Report   on    Concrete   and    Reinforced    Concrete 

306-SB.  Concrete  Made  with  High  Early  Strength  Portland  Cement 

When  high  early  strength  Portland  cement  is  used  in  lieu  of  normal  Portland  cement, 
the  requirements  given  in  Table  B  shall  apply,  except  that  the  estimated  28-day  strength 
indicated  for  normal  Portland  cement  concrete  shall  be  the  estimated  7-day  strength 
when  high  early  strength  Portland  cement  concrete  is  used.  The  ages  at  time  of  test 
specified  in  Sec.  303-SB  shall  be  3  days  and  7  days,  respectively,  in  lieu  of  the  7-day 
and  28-day  ages  specified  for  normal  Portland  cement. 

310-S.  Measurements  of  Materials 

(a)  Materials  shall  be  measured  by  weighing,  except  as  otherwise  specified  or  where 
other  methods  are  specifically  authorized  by  the  Engineer.  The  apparatus  provided  for 
weighing  the  aggregates  and  cement  shall  be  suitably  designed  and  constructed  for  this 
purpose.  Each  size  of  aggregate  and  the  cement  shall  be  weighed  separately.  The  accu- 
racy of  all  weighing  devices  shall  be  such  that  successive  quantities  can  be  measured  to 
within  one  percent  of  the  desired  amount.  Cement  in  standard  packages  (sack)  need  not 
be  weighed,  but  bulk  cement  and  fractional  packages  shall  be  weighed.  The  mixing 
water  shall  be  measured  by  volume  or  by  weight.  The  water  measuring  device  shall  be 
susceptible  of  control  accurate  to  plus  or  minus  ^  percent  of  the  capacity  of  the  tank. 
All  measuring  devices  shall  be  subject  to  approval. 

(b)  Where  volumetric  measurements  are  authorized  by  the  Engineer,  the  weight 
proportions  shall  be  converted  to  equivalent  volumetric  proportions.  In  such  case,  suit- 
able allowance  shall  be  made  for  variations  in  the  moisture  condition  of  the  aggregates, 
including  the  bulking  effect  in  the  fine  aggregate. 

Mixing 
311-S.  Equipment 

The  mixing  equipment  shall  be  capable  of  combining  the  aggregates,  cement,  and 
water  within  the  specified  time  into  a  thoroughly  mixed  and  uniform  mass,  and  of 
discharging  the  mixture  without  segregation. 

312-S.  Machine  Mixing  (at  Site  or  at  Central  Mixing  Plant) 

Unless  otherwise  authorized  by  the  Engineer,  the  mixing  of  concrete  shall  be  done 
in  a  batch  mixer  of  approved  type  which  will  insure  a  uniform  distribution  of  the 
material  throughout  the  mass.  The  equipment  at  the  mixing  plant  shall  be  so  constructed 
that  all  materials  (including  the  water)  entering  the  drum  can  be  accurately  propor- 
tioned and  be  under  control.  The  entire  batch  shall  be  discharged  before  recharging.  The 
volume  of  the  mixed  material  per  batch  shall  not  exceed  the  manufacturer's  rated 
capacity  of  the  mixer.  Except  as  qualified  in  Sec.  314-S,  mixing  of  each  batch  shall 
continue  for  the  periods  indicated  below*  during  which  time  the  drum  shall  rotate  at  a 
peripheral  speed  of  about  200  ft.  per  min.  The  mixing  periods  shall  be  measured  from 
the  time  when  all  of  the  soUd  materials  are  in  the  mixer  drum,  provided  that  all  of  the 
mixing  water  shall  be  introduced  before  one-fourth  of  the  mixing  time  has  elapsed. 

Mixing  time  shall  be  as  follows: 

1.  For  mixers  of  a  capacity  of  one  cubic  yard  or  less — 1  min. 

2.  For  mixers  of  capacities  larger  than  one  cubic  yard,  the  time  of  mixing  shall 
be  increased  IS  sec.  for  each  additional  half-cubic  yard  capacity  or  fraction  thereof. 

*  When,  in  the  judgment  of  the  Engineer,  longer  mixing  times  are  necessary  he  should  so  specify. 


Mixing  113 

313-S.  Truck  Mixing 

Truck  mixers,  unless  otherwise  authorized  by  the  Engineer,  shall  be  of  the  revolving 
drum  type,  watertight,  and  so  constructed  that  the  concrete  can  be  mixed  to  insure  a 
uniform  distribution  of  materials  throughout  the  mass.  All  solid  materials  for  the  con- 
crete shall  be  accurately  measured  in  accordance  with  Sec.  310-S  and  charged  into  the 
drum  at  the  proportioning  plant.  Except  as  subsequently  provided,  the  truck  mixer  shall 
be  equipped  with  a  tank  for  carrying  mixing  water.  Only  the  prescribed  amount  of  water 
shall  be  placed  in  the  tank  unless  the  tank  is  equipped  with  a  device  by  which  the  quan- 
tity of  water  added  can  be  readily  verified.  The  mixing  water  may  be  added  directly  to 
the  batch,  in  which  case  a  tank  shall  not  be  required.  Truck  mixers  may  be  required  to 
be  provided  with  means  by  which  the  mixing  time  can  be  readily  verified  by  the  Engi- 
neer. The  maximum  size  of  batch  in  truck  mixers  shall  be  in  accordance  with  the  speci- 
fied rating.*  Truck  mixing  shall  be  continued  for  not  less  than  50  revolutions  after  all 
ingredients,  including  the  water,  are  in  the  drum.  The  speed  shall  not  be  less  than 
4  r.p.m.,  nor  more  than  a  speed  resulting  in  a  peripheral  velocity  of  the  drum  of  225  ft. 
per  min.  Not  more  than  150  revolutions  of  mixing  shall  be  at  a  speed  in  excess  of 
6  r.p.m.  Mixing  shall  begin  within  30  min.**  after  the  cement  has  been  added  either  to 
the  water  or  aggregate. 

314-S.  Partial  Mixing  at  the  Central  Plant 

When  a  truck  mixer,  or  an  agitator  provided  with  adequate  mixing  blades,  is  used 
for  transportation,  the  mixing  time  at  the  stationary  machine  mixer  may  be  reduced  to 
30  sec.  and  the  mixing  completed  in  a  truck  mixer  or  agitator.  The  mixing  time  in  the 
truck  mixer  or  agitator  equipped  with  adequate  mixing  blades  shall  be  as  specified  for 
truck  mixing  in  Sec.  313-S. 

315-S.  Time  of  Hauling  Ready-Mixed  Concrete 

Concrete  transported  in  a  truck  mixer,  agitator,  or  other  transportation  device  shall 
be  discharged  at  the  job  within  V/^  hoursf  after  the  cement  has  been  added  to  the  water 
or  the  aggregates.  The  maximum  volume  of  mixed  concrete  transported  in  an  agitator 
shall  be  in  accordance  with  the  specified  rating. 

316-S.  Hand  Mixing 

When  hand  mixing  is  authorized  it  shall  be  done  on  a  watertight  platform  and  in 
such  a  manner  as  to  insure  a  uniform  distribution  of  the  materials  throughout  the  mass. 
Mixing  shall  be  continued  until  a  homogeneous  mixture  of  the  required  consistency  is 
obtained. 

317-S.  Retempering 

The  retempering  of  concrete  or  mortar  which  has  partially  hardened,  that  is,  mixing 
with  or  without  additional  cement,  aggregate,  or  water,  will  not  be  permitted. 


*  See  Sec.  308  of  Recommended  Practice. 

•*  When  cement  is  charged  into  a  mixer  drum  containing  water  or  surface-wet  aggregate  and  when 
the  temperature  is  above  90  deg.  F.,  or  when  high  early  strength  Portland  cement  is  used,  this  limit 
shall  be  reduced  to  15  min.;  the  limitation  on  time  between  the  introduction  of  the  cement  to  the  aggre- 
gates and  the  beginning  of  the  mixing  may  be  waived  when,  in  the  judRment  of  the  Engineer,  the 
aggregates  are  sufficiently  free  from  moisture,  so  that   there  will   be  no  harmful   effects  on   the  cement. 

t  See  Sec.  308  of  Recommended  Practice. 


114 Report    on    Concrete   and    Reinforced    Concrete 

Curing  of  Concrete 
318-S.  Protection 

(a)  All  concrete,  except  as  noted  under  (c)  below,  placed  under  these  specifications 
shall  be  so  protected  that  the  temperature  at  the  surface  will  not  fall  below  50  deg.  F., 
or  that  there  will  be  no  loss  of  moisture  from  the  surface  for  the  periods  indicated  below. 

1.  Where  normal  Portland  cement  is  used — seven  days. 

2.  Where  high  early  strength  Portland  cement  is  used — three  days. 

(b)  The  Contractor  shall  submit  for  the  approval  of  the  Engineer  the  methods  he 
proposes  to  use  for  protecting  the  concrete  against  low  temperatures. 

(c)  The  requirement  in  (a)  and  (b)  above  concerning  the  temperature  at  the  sur- 
face is  intended  to  apply  to  the  placing  of  concrete  in  those  seasons  of  the  year,  or  in 
such  places  where  the  possibilitj'  of  freezing  or  continued  low  temperatures  is  to  be 
expected.  It  is  not  intended  to  apply  where  temperatures  below  40  deg.  F.  are  a  rarity. 
In  any  case,  however,  concrete  must  be  protected  from  freezing  temperatures  at  any 
time  during  the  first  72  hours  where  normal  Portland  cement  is  used,  or  24  hours  where 
high  early  strength  Portland  cement  is  used. 

(d)  Protection  against  loss  of  moisture  from  the  surface  of  the  concrete  shall  be 
accomplished  by  keeping  the  surface  continuously  wet.  One  of  the  following  methods 
shall  be  used:* 

Field  Tests  of  Concrete 
320-S.  Field  Tests 

During  the  progress  of  construction  the  Engineer  will  have  tests  made  to  determine 
whether  the  concrete  as  being  produced  complies  with  the  standards  of  quality  specified 
in  Sec.  301-S(A  or  B).  These  tests  will  be  made  in  accordance  with  Sec.  321-S  to 
32S-S.  The  Contractor  shall  cooperate  in  the  making  of  such  tests  to  the  extent  of 
allowing  free  access  to  the  work  for  the  selection  of  samples  and  storage  of  specimens, 
and  in  affording  protection  to  the  specimens  against  injury  or  loss  through  his  operations. 

321-S.  Test  Pieces 

Three  cylinders  or  beams  will  generally  be  made  for  each  class  of  concrete  used  in 
any  one  day's  operation.  In  special  cases  this  normal  number  of  control  specimens  may 
be  exceeded  when  in  the  opinion  of  the  Engineer  such  additional  tests  are  necessary.  The 
Contractor,  however,  shall  not  be  required  to  furnish  for  such  additional  tests  more  than 
2  cu.  ft.  of  concrete  from  each  100  cu.  yd.  of  concrete  being  placed. 

322-S.  Sampling  and  Curing  of  Test  Pieces 

Samples  of  concrete  for  test  specimens  shall  be  taken  at  the  mixer,  or  in  the  case 
of  ready  mixed  concrete,  from  the  transportation  vehicle  during  discharge.  When,  in  the 
opinion  of  the  Engineer,  it  is  desirable  to  take  samples  elsewhere,  they  shall  be  taken 
as  directed  by  him.  The  test  specimens  shall  be  molded  immediately  after  the  sample  is 
taken,  placed  in  a  protected  spot  and  kept  under  moist  curing  conditions  at  approxi- 
mately 70  deg.  F.  for  24  hours,  whereupon  they  shall  be  removed  to  the  testing  labora- 
tory.** In  the  laboratory  they  shall  be  kept  under  standard  moist  curing  conditions  at 
70  deg.  F.  (±5  deg.  F.)  until  time  of  test  and  shall  be  tested  in  the  damp  condition. 


*  The  Engineer  shall  list  the  methods  which  he  is  willing  to  approve.  See  Recommended  Practice 
Sec.  i09(b)  for  suggestions. 

**  The  temperature  and  other  storage  conditions  of  the  test  specimens  during  the  first  few  days  is  a 
vital  factor  in  the  strength  results.  It  is  the  intent  of  these  specifications  that  the  requirements  herein 
specified  shall  be  complied  with  minutely;  however,  the  exact  details  of  storage  and  transportation 
facilities  shall  be  those  best  suited  to  the  individual  requirements. 


Field    Tests   of    Concrete US 

323-S.  Age 

The  tests  shall  be  made  at  the  age  of  the  concrete  corresponding  to  that  for  which 
the  strengths  are  specified  in  Tables  A  or  B. 

324-S.  Compression  Tests 

For  compression  tests,  the  size  of  cylinder  and  the  manner  of  molding,  capping,  and 
testing  shall  be  in  accordance  with  the  ASTM  Standard  Method  of  Test  for  Compressive 
Strength  of  Concrete  (ASTM  Designation:  C39-39). 

325-S.  Flexure  Tests 

For  flexure  tests,  the  size  and  shape  of  specimens  and  the  manner  of  molding  and 
testing  shall  be  in  accordance  with  the  ASTM  Standard  Method  of  Test  for  Flexural 
Strength  of  Concrete  (Laboratory  Method  Using  Simple  Beam  with  Third-Point  Load- 
ing),  (ASTM  Designation  C78-39). 

Enforcement  of  Strength  Requirements 

326-SA.  Failure  to  Meet  Requirements 

Should  the  strengths  shown  by  the  test  specimens  made  and  tested  in  accordance 
with  the  provisions  of  Sec.  320-S  fall  below  the  values  given  in  Sec.  301-SA,  the  Engi- 
neer shall  have  the  right  to  require  changes  in  proportions  as  outlined  in  Sec.  306-SA  to 
apply  on  the  remainder  of  the  work.  Furthermore,  the  Engineer  shall  have  the  right  to 
require  additional  curing,  as  specified  in  Sec.  328-SA,  on  those  portions  of  the  structure 
represented  by  the  test  specimens  which  failed.  In  the  event  that  such  additional  curing 
does  not  give  the  strength  required  the  Engineer  shall  have  the  right  to  require  strength- 
ening or  replacement  of  those  portions  of  the  structure  which  fail  to  develop  the 
required  strength. 

327-SA.  Definition  of  Failure 

The  specimens  will  be  considered  to  have  failed  when  the  average  strength  for  any 
period  of  placing  is  less  than  the  values  indicated  in  the  following  table: 

Percent  of  Strength  Specified 

No.  Days  Consecutive  Placing  of  Any  One  Class  of  in  Section 

Concrete  301-SA 

1 85 

2 ._     90 

3 95 

5  or  more 100 

328-SA.  Additional  Curing 

When  additional  curing  of  portions  of  the  structure  is  ordered  by  the  Engineer  in 
accordance  with  Sec.  326-SA,  it  shall  be  done  at  the  Contractor's  expense  and  no  claim 
for  extra  compensation  for  such  additional  curing  shall  be  allowed.  Such  additional  cur- 
ing shall  consist  in  an  extension  of  the  periods  of  protection  specified  in  Sec.  318-S  as 
may,  in  the  judgment  of  the  Engineer,  be  necessary.  In  no  case,  however,  shall  the 
Contractor  be  required  to  provide  such  additional  curing  beyond  a  total  of  21  days, 
except  where  the  average  strengths  of  specimens,  representing  concrete  placed  on  any 
three  consecutive  days,  fall  below  80  percent  of  the  value  specified  in  Table  A,  Sec. 
301-SA.  In  this  case,  curing  shall  be  continued  until  cores  drilled  from  portions  of  the 


116 Report    on    Concrete    and   Reinforced    Concrete 

structure  involved  show  an  average  strength  equal  to  that  specified  in  Table  A.  Cores 
for  this  purpose  shall  have  a  diameter  of  approximately  three  times  the  maximum  size 
of  aggregate  and  shall  be  secured,  capped,  and  tested  in  accordance  with  Standard  Methods 
of  Securing  Specimens  of  Hardened  Concrete  from  the  Structure,  (ASTM  Designation: 
C42-39). 


Forms  and  Placing 

Forms 
401-S.  General 

Forms  shall  conform  to  the  shape,  lines,  grades,  and  dimensions  of  the  concrete  as 
called  for  on  the  drawings.  Lumber  used  in  forms  for  exposed  surfaces  shall  be  dressed 
to  a  uniform  thickness,  and  shall  be  free  from  loose  knots  or  other  defects.  Joints  in 
forms  shall  be  horizontal  or  vertical  where  appearance  of  the  finished  surface  is  of 
importance.  For  unexposed  surfaces  and  rough  work,  undressed  lumber  may  be  used. 
Lumber  once  used  in  forms  shall  have  nails  withdrawn,  and  surfaces  to  be  in  contact 
with  concrete  thoroughly  cleaned  before  being  used  again. 

402-S.  Design 

(a)  Forms  shall  be  sufficiently  tight  to  prevent  leakage  of  mortar.  They  shall  be 
properly  braced  or  tied  together  so  as  to  maintain  the  desired  position  and  shape  during 
and  after  placing  concrete.  In  the  case  of  very  long  spans  where  no  intermediate  sup- 
ports are  possible,  the  probable  deflection  in  the  forms  due  to  the  weight  of  the  fresh 
concrete  shall  be  taken  into  account  so  that  the  finished  members  shall  conform  accu- 
rately to  the  desired  line  and  grade.  If  adequate  foundation  for  shores  cannot  be 
secured,  trussed  supports  shall  be  provided. 

(b)  Bolts  and  rods  shall  preferably  be  used  for  internal  ties;  they  shall  be  so 
arranged  that  when  the  forms  are  removed  no  metal  shall  be  within  one  inch  of  any 
surface.  Shores  supporting  successive  stories  shall  be  placed  directly  over  those  below, 
or  so  designed  and  placed  that  the  load  will  be  transmitted  directly  to  them. 

403-S.  Moldings 

Unless  otherwise  specified  suitable  moldings  or  bevels  shall  be  placed  in  the  angles 
of  forms  to  round  or  bevel  the  edges  of  the  concrete. 

404-S.  Oiling 

The  inside  of  forms  shall  be  coated  with  nonstaining  mineral  oil  or  other  approved 
material,  or  in  case  of  wood  forms  they  shall  be  thoroughly  wetted  (except  in  freezing 
weather).  Where  oil  is  used,  it  shall  be  applied  before  the  reinforcement  is  placed. 

405-S.  Inspection 

Temporary  openings  shall  be  provided  at  the  base  of  column  and  wall  forms  and 
at  other  points  where  necessary  to  facilitate  cleaning  and  inspection  immediately  before 
depositing  concrete. 

406-S.  Form  Removal 

The  removal  of  forms  shall  not  be  started  until  the  concrete  has  attained  the  neces- 
sary strength  to  support  its  own  weight  and  any  construction  live  loads. 


Forms   and   Placing 117 


Depositing  Concrete 
407-S.  General 

(a)  Before  beginning  placement  of  concrete,  hardened  concrete  and  foreign  mate- 
rials shall  be  removed  from  the  inner  surface  of  the  mixing  and  conveying  equipment. 

(b)  Before  depositing  concrete,  debris  shall  be  removed  from  the  space  to  be  occu- 
pied by  the  concrete;  forms  if  constructed  of  lumber  shall  be  thoroughly  wetted  (except 
in  freezing  weather)  or  oiled.  Reinforcement  shall  be  thoroughly  secured  in  position  and 
approval  by  the  Engineer  obtained  before  concrete  is  placed. 

408-S.  Removal  of  Water 

Water  shall  be  removed  from  the  space  to  be  occupied  by  the  concrete  before 
concrete  is  deposited,  unless  otherwise  directed  by  the  Engineer.  Any  flow  of  water  into 
an  excavation  shall  be  diverted  through  proper  side  drains  to  a  sump,  or  be  removed  by 
other  approved  methods  which  will  avoid  washing  the  freshly  deposited  concrete.  If 
directed  by  the  Engineer  water  vent  pipes  and  drains  shall  be  filled  by  grouting  or 
otherwise  after  the  concrete  has  thoroughly  hardened. 

409-S.  Handling 

(a)  Concrete  shall  be  handled  from  the  mixer,  or  in  the  case  of  ready-mixed  con- 
crete, from  the  transporting  vehicle,  to  the  place  of  final  deposit  as  rapidly  as  prac- 
ticable by  methods  which  shall  prevent  the  separation  or  loss  of  the  ingredients.  (See 
Sec.  31S-S.)  Under  no  circumstances  shall  concrete  that  has  partially  hardened  be  de- 
posited in  the  work.  Concrete  shall  be  deposited  in  the  forms  as  nearly  as  practicable  in 
its  final  position  to  avoid  rehandling.  It  shall  be  so  deposited  as  to  maintain,  until  the 
completion  of  the  unit,  a  plastic  surface  approximately  horizontal.  Forms  for  walls  or 
thin  sections  of  considerable  height  shall  be  provided  with  openings  or  other  devices  that 
will  permit  the  concrete  to  be  placed  in  a  manner  that  will  prevent  segregation  and 
accumulations  of  hardened  concrete  on  the  forms  or  metal  reinforcement  above  the  level 
of  the  concrete. 

(b)  Concrete  regardless  of  the  type  of  transporting  vehicle,  shall  have  when  deposited 
in  the  forms  the  quaUty  required. 

410-S.  Chuting 

When  concrete  is  conveyed  by  chutes,  the  equipment  shall  be  of  such  size  and  design 
as  to  insure  a  continuous  flow  in  the  chute.  The  chutes  shall  be  of  metal  or  metal  lined 
and  the  different  portions  shall  have  approximately  the  same  slope.  The  slope  shall  not 
be  less  than  one  vertical  to  two  horizontal  and  shall  be  such  as  to  prevent  the  segrega- 
tion of  the  ingredients.  The  discharge  end  of  the  chute  shall  be  provided  with  a  baffle 
plate  to  prevent  segregation.  If  the  distance  of  the  discharge  end  of  the  chute  above  the 
surface  of  the  concrete  is  more  than  three  times  the  thickness  of  the  layer  being  deposited, 
but  not  more  than  five  feet  above  the  surface  of  the  concrete,  a  spout  shall  be  used,  and 
the  lower  end  maintained  as  near  the  surface  of  deposit  as  practicable.  When  the  opera- 
tion is  intermittent,  the  chute  shall  discharge  into  a  hopper.  The  chute  shall  be  thoroughly 
cleaned  before  and  after  each  run  and  the  debris  and  any  water  used  shall  be  discharged 
outside  the  forms. 

411-S.  Pneumatic  Placing 

(a)  Where  concrete  is  conveyed  and  placed  by  pneumatic  means  the  equipment 
shall  be  suitable  in  kind  and  adequate  in  capacity  for  the  work.  The  machine  shall  be 
located  as  close  as  practicable  to  the  place  of  deposit.  The  position  of  the  discharge  end 


118 Report    on    Concrete    and    Reinforc  ed    Concrete 

of  the  line  shall  not  be  more  than  ten  feet  from  the  point  of  deposit.  The  discharge 
lines  shall  be  horizontal  or  inclined  upwards  from  the  machine. 

(b)  At  the  conclusion  of  placement  the  entire  equipment  shall  be  thoroughly  cleaned. 

412-S.  Pumping 

Where  concrete  is  conveyed  and  placed  by  mechanically  applied  pressure  the  equip- 
ment shall  be  suitable  in  kind  and  adequate  in  capacity  for  the  work.  The  operation  of 
the  pump  shall  be  such  that  a  continuous  stream  of  concrete  without  air  pockets  is  pro- 
duced. When  pumping  is  completed,  the  concrete  remaining  in  the  pipeline,  if  it  is  to  be 
used,  shall  be  ejected  in  such  a  manner  that  there  will  be  no  contamination  of  the 
concrete  or  separation  of  the  ingredients.  After  this  operation  the  entire  equipment  shall 
be  thoroughly  cleaned.  (See  Recommended  Practice,  Sec.  403.) 

413-S.  Compacting 

(a)  Concrete  during  and  immediately  after  depositing  shall  be  thoroughly  com- 
pacted by  means  of  suitable  tools.  For  thin  walls  or  inaccessible  portions  of  the  forms, 
where  spading,  rodding,  or  forking  is  impracticable,  the  concrete  shall  be  worked  into 
plac^  by  vibrating,  or  hammering  the  forms  lightly  opposite  the  freshly  deposited  con- 
crete. The  concrete  shall  be  thoroughly  worked  around  the  reinforcement,  and  around 
embedded  fixtures,  and  into  the  corners  of  the  forms. 

(b)  Accumulations  of  water  on  the  surface  of  the  concrete  due  to  water  gain,  segre- 
gation or  other  causes,  during  placement  and  compacting,  shall  be  prevented  as  far  as 
possible  by  adjustments  in  the  mixture.  Provision  shall  be  made  for  the  removal  of  such 
water  as  may  accumulate  so  that  under  no  circumstances  will  concrete  be  placed  in  such 
accumulations.   (See  Recommended  Practice,  Sec.  404.) 

(   shall  )   * 

(c)  Concrete   }   may  I  be  compacted  by  mechanical  vibration. 

(   shall  not    j 

When  mechanical  vibration  is  used  the  number  and  type  of  vibrators  shall  be  subject  to 
the  approval  of  the  Engineer. 

414-S.  Depositing  Continuously 

Concrete  shall  be  deposited  continuously,  or  in  layers  of  such  thickness  that  no  con- 
crete will  be  deposited  on  'concrete  which  has  hardened  sufficiently  to  cause  the  formation 
of  seams  and  planes  of  weakness  within  the  section.  If  a  section  cannot  be  placed  con- 
tinuously, construction  joints  may  be  located  at  points  as  provided  for  in  the  drawings 
or  approved  by  the  Engineer.  Such  joints  shall  be  made  in  accordance  with  the  pro- 
visions in  Sec.  S08-S  to  SlO-S. 

415-S.  Depositing  in  Cold  Weather 

Concrete  when  deposited  shall  have  a  temperature  of  not  less  than  50  deg.  F.  nor 
more  than  120  deg.  F.  In  freezing  weather,  suitable  means  shall  be  provided  for  main- 
taining the  concrete  at  the  temperature  and  for  the  periods  specified  in  Sec.  318-S,  or 
until  the  concrete  has  thoroughly  hardened.  Before  placing  the  concrete,  the  forms  shall 
be  free  from  frost  and  ice,  and  after  the  concrete  is  placed  it  shall  be  protected  on  all 
exposed  sides  by  straw,  tarpaulins,  or  other  means.  Manure,  if  used  for  such  protection, 
shall  not  come  in  contact  with  the  concrete.  The  methods  of  heating  the  materials  and 
protecting  the  concrete  shall  be  approved  by  the  Engineer.  Salts,  chemicals,  or  other 
foreign  materials  shall  not  be  mixed  with  the  concrete  for  the  purpose  of  preventing 
freezing. 


*  The  Engineer  shall  indicate  which  of  these  requirements  is  to  apply. 


Forms    and   Placing  119 


416-S.  Bonding 

Before  depositing  new  concrete  on  or  against  concrete  which  has  hardened,  the 
forms  shall  be  retightened.  The  surface  of  the  hardened  concrete  shall  be  roughened  as 
required  by  the  Engineer,  in  a  manner  that  will  not  leave  loosened  particles  of  aggregate 
or  damaged  concrete  at  the  surface.  It  shall  be  thoroughly  cleaned  of  foreign  matter  and 
laitance,  and  saturated  with  water.  To  insure  an  excess  of  mortar  at  the  juncture  of  the 
hardened  and  the  newly  deposited  concrete,  the  cleaned  and  saturated  surfaces,  including 
vertical  and  inclined  surfaces,  shall  first  be  thoroughly  covered  with  a  coating  of  mortar 
or  neat  cement  grout  against  which  the  new  concrete  shall  be  placed  before  the  grout 
has  attained  its  initial  set. 

417-S.  Protection  and  Curing 

The  concrete  shall  be  protected  and  cured  in  accordance  with  requirements  of 
Sec.  318-S. 

418-S.  Placing  Cyclopean  Concrete 

Cyclopean  aggregate  shall  be  thoroughly  embedded  with  no  stone  closer  than  one 
foot  to  any  surface,  and  with  a  space  of  at  least  six-inch  between  adjacent  stones. 
Stratified  stone  shall  be  laid  on  its  natural  bed.  Cyclopean  aggregate  shall  be  carefully 
placed  to  avoid  injury  to  forms  or  adjoining  masonry. 

419-S.  Placing  Rubble  Concrete 

Rubble  aggregate  shall  be  thoroughly  embedded  in  the  concrete. 

The  individual  stones  shall  not  be  closer  than  four  inches  to  any  surface  or  adjacent 
stones.  Rubble  aggregate  shall  be  carefully  placed  to  avoid  injury  to  forms  or  adjacent 
masonry. 

420-S.  Depositing  Concrete  Under  Water 

(a)  When  it  is  necessary  to  deposit  concrete  under  water  the  methods,  equipment, 
materials,  and  proportions  of  the  mixture  to  be  used  shall  be  submitted  to  and  be 
approved  by  the  Engineer  before  the  work  is  started. 

(b)  Concrete  shall  not  be  placed  in  water  having  a  temperature  below  35  deg.  F. 
The  temperature  of  the  concrete,  when  deposited,  shall  not  be  less  than  60  deg.  F.  nor 
more  than  120  deg.  F. 

(c)  The  concrete  shall  contain  not  less  than  7  sacks  or  658  lb.  of  cement  per  cubic 
yard.  The  volume  or  weight  of  the  coarse  aggregate  shall  not  be  less  than  one  and  one- 
half,  nor  more  than  twice  that  of  the  fine  aggregate.  The  concrete  shall  be  mixed  with 
sufficient  water  to  produce  a  concrete  having  a  slump  of  not  less  than  four  inches  and 
not  more  than  seven  inches. 

(d)  Cofferdams  or  forms  shall  be  sufficiently  tight  to  reduce  the  flow  or  current  of 
water  to  ten  feet  per  minute  through  the  space  into  which  concrete  is  to  be  deposited. 
Cofferdams  or  forms  in  still  water  shall  be  sufficiently  tight  to  prevent  loss  of  mortar 
through  the  walls.  Pumping  will  not  be  permitted  while  concrete  is  being  placed,  nor 
until  24  hours  thereafter. 

(e)  Concrete  shall  be  deposited  continuously  until  it  is  brought  to  the  required 
height.  While  depositing,  the  top  surface  shall  be  kept  as  nearly  level  as  possible  and 
the  formation  of  seams  avoided.  The  methods  to  be  used  for  depositing  concrete  under 
water  shall  be  one  of  the  following: 

1.  Tremie. — The  tremie  shall   be  watertight  and  large  enough  to  allow  a  free 
flow  of  concrete.  It  shall  be  kept  filled  with  concrete  at  all  times  while  depositing. 


120 Report    on    Concrete   and   Reinforced    Concrete 

The  concrete  shall  be  discharged  and  spread  by  so  moving  the  tremie  as  to  maintain 
as  nearly  as  practicable  a  uniform  flow  and  avoid  dropping  the  concrete  through 
water.  If  the  charge  is  lost,  while  depositing,  the  tremie  shall  be  withdrawn  and 
refilled.  The  slump  of  concrete  shall  be  maintained  between  five  and  seven  inches. 

2.  Drop  Bottom  Bucket. — The  top  of  the  bucket  shall  be  open.  The  bottom 
doors  shall  open  freely  downward  and  outward  when  tripped.  The  bucket  shall  be 
completely  filled  and  slowly  lowered  to  avoid  backwash.  It  shall  not  be  dumped 
until  it  rests  on  the  surface  upon  which  the  concrete  is  to  be  deposited  and  when 
discharged  shall  be  withdrawn  slowly  until  well  above  the  concrete.  The  slump  of 
concrete  shall  be  maintained  between  four  and  six  inches. 

3.  Bags. — Bags  of  at  least  one  cubic  foot  capacity,  of  jute  or  other  coarse 
cloth,  shall  be  filled  about  two-thirds  full  of  concrete  and  securely  tied.  They  shall 
be  placed  carefully  in  header-and-stretcher  courses  so  that  the  whole  mass  is  inter- 
locked. Bags  used  for  this  purpose  shall  be  free  from  deleterious  materials. 

(f)  To  minimize  the  formation  of  laitance  great  care  shall  be  exercised  to  disturb 
the  concrete  as  little  as  possible  while  it  is  being  deposited.  Upon  completion  of  a  section 
of  concrete,  all  laitance  shall  be  entirely  removed  before  work  is  resumed. 

421-S.  Depositing  Concrete  Exposed  to  Corrosive  Waters  or  Soils 

Where  concrete  may  be  exposed  to  the  action  of  corrosive  waters  or  soils,  special 
care  shall  be  taken  to  place  it  in  accordance  with  Sec.  407-S  to  416-S.  Wherever  pos- 
sible placing  shall  be  continuous  until  completion  of  the  section  or  until  the  concrete  is 
at  least  18  in.  above  ground  or  water  level.  Corrosive  waters  or  soils  shall  be  kept  from 
contact  with  the  concrete  during  placement  and  for  a  period  of  at  least  72  hours 
thereafter. 

422-S.  Pneumatically  Applied  Mortar 

(a)  GcMem/.— This  section  refers  to  premixed  sand  and  cement  pneumatically  applied 
by  suitable  mechanism  and  competent  operators,  and  to  which  mixture  the  water  is 
added  immediately  previous  to  its  expulsion  from  the  nozzle. 

(b)  Quality  of  Materials. — The  quality  of  cement,  sand,  and  water  shall  be  in 
accordance  with  Sec.  201-S  to  213-S. 

(c)  Proportions. — The  proportions  of  cement  to  sand  shall  be  based  on  dry  and 
loose  volumes  and  shall  not  be  less  than  one  to  four  for  encasement  of  steel  members, 
one  to  three  for  concrete  repair,  nor  one  to  four  and  a  half  for  canal  linings. 

(d)  Water  Content. — The  water  content  shall  be  maintained  at  a  practicable  mini- 
mum and  not  in  excess  of  three  gallons  per  sack  of  cement  as  placed. 

(e)  Mixing. — The  cement  and  sand  shall  be  thoroughly  mixed  before  being  charged 
into  the  machine.  The  sand  shall  contain  not  less  than  four  percent  moisture. 

(f)  Nozzle  Velocity. — ^The  velocity  of  the  material  as  it  leaves  the  nozzle  must  be 
maintained  uniform  at  a  rate  determined  for  the  given  job  conditions  to  produce 
minimum   rebound. 

(g)  Nozzle  Position. — The  nozzle  shall  be  held  in  such  a  position  and  at  such  dis- 
tance that  the  stream  of  flowing  material  will  impinge  at  approximately  right  angles  to 
the  surface  being  covered  without  excessive  impact. 

(h)  Rebound  Sand. — Rebound  or  accumulated  loose  sand  shall  be  removed  from 
the  surface  to  be  covered  prior  to  placing  of  the  original  or  succeeding  layers  of  mortar. 

(i)  Forms. — The  forms  shall  be  structurally  sufficient  and  of  such  design  that 
rebound  or  accumulated  loose  sand  can  freely  escape  or  be  readily  removed.  Shooting 


I 


Details   of    Construction  121 


strips  should  be  used  at  corners,  edges,  and  on  surfaces  where  necessary  to  obtain  true 
lines  and  proper  thickness. 

(j)  Joints.— The  pneumatically  applied  mortar  at  the  end  of  any  day's  work  or 
similar  stopping  periods  shall  be  sloped  ofif  to  a  thin  edge.  Before  placing  an  adjacent 
section  this  sloped  portion  shall  be  thoroughly  cleaned  and  wetted. 

(k)  Bond. — Surfaces  to  which  pneumatically  applied  mortar  is  to  be  bonded  shall 
be  thoroughly  cleaned  of  dirt,  paint,  grease,  organic  matter  and  loose  particles.  Absorptive 
surfaces  shall  be  wetted  before  the  application  of  the  mortar. 

(I)  Curing. — Pneumatically  applied  mortar  shall  be  so  appUed,  protected,  and  cured 
as  to  prevent  its  temperature  falling  below  50  deg.  F.,  or  a  loss  of  moisture  from  the 
surface  for  the  periods  indicated  below. 

1.  Where  normal  Portland  cement  is  used,  seven  days. 

2.  Where  high  early  strength  Portland  cement  is  used,  three  days. 

Pneumatically  applied  mortar  shall  be  appUed  only  with  the  permission  of  the  Engineer 
when  the  air  temperature  is  SO  deg.  F.  or  less. 

(m)  Reinforcement. — The  reinforcement  when  required  shall  be  adequate  from  the 
standpoint  of  structural  requirements  and  shall  consist  of  mesh  or  round  bars,  spaced 
not  less  than  two  inches  nor  more  than  four  inches  apart  either  way,  and  having  a 
diameter  not  less  than  that  of  No.  12  wire.  The  area  of  the  reinforcement  shall  be  at 
least  0.2  percent  of  the  cross-sectional  area  of  the  mortar.  The  reinforcement  shall  be  at 
least  %  in.  from  the  unexposed  surface  of  the  mortar  and  at  least  ^  in.  from  the 
exposed  surface. 

Note:   For  recommended  practice  for  pneumatically  apphed  mortar  see  Sec.  406. 


Details  of  Construction 

Handling  Metal  Reinforcement 
501-S.  Cleaning 

Metal  reinforcement  before  being  positioned  shall  be  free  from  loose  mill  and  rust 
scale  and  from  coatings,  including  ice,  that  destroy  or  reduce  the  bond.  Where  there  is 
delay  in  depositing  concrete,  reinforcement  shall  be  reinspected  and  cleaned  when 
necessary. 

502-S.  Fabrication 

Reinforcement  shall  be  accurately  formed  to  the  dimensions  indicated  on  the  draw- 
ings. Stirrups  and  tie  bars  shall  be  bent  around  a  pin  having  a  diameter  not  less  than 
two  times  the  minimum  thickness  of  the  bar.  Bends  for  other  bars  shall  be  made 
around  a  pin  having  a  diameter  not  less  than  six  times  the  minimum  thickness  except 
for  bars  larger  than  one  inch  in  which  case  the  bends  shall  be  made  around  a  pin  of 
eight  bar  diameters.  All  bars  shall  be  bent  cold. 

503-S.  Straightening  and  Rebending 

Metal  reinforcement  shall  not  be  straightened  or  rebent  in  a  manner  that  will  injure 
the  material.  Bars  with  kinks,  or  bends  not  shown  on  the  drawings,  shall  not  be  used. 
Heating  of  the  reinforcement  will  be  permitted  only  when  the  entire  operation  is 
approved  by  the  Engineer. 


122 Report    on    Concrete    and    Reinforced    Concrete 

504-S.  Placing  Reinforcement 

(a)  Metal  reinforcement  shall  be  accurately  positioned  and  secured  against  dis- 
placement by  using  annealed  iron  wire  ties  or  suitable  clips  at  intersections,  and  shall  be 
supported  by  concrete  or  metal  supports,  spacers  or  metal  hangers.  Where  indicated  on 
the  drawings  or  required  by  the  specifications,  metal  clips  or  supports  shall  not  be  placed 
in  contact  with  the  forms. 

(b)  The  minimum  center  to  center  distance  between  parallel  bars  shall  be  2J^  times 
the  diameter  of  round  or  3  times  the  side  dimensions  for  square  bars,  but  in  no  case 
shall  the  clear  spacing  between  the  bars  be  less  than  IJ^  times  the  maximum  size  of  the 
coarse  aggregate  nor  less  than  1  inch  in  beams  and  girders,  nor  less  than  1^  inch  in 
columns.  Bars  parallel  to  the  exterior  surface  of  any  member  not  exposed  to  the  weather 
shall  be  embedded  at  least  one  bar  diameter  for  round  bars,  or  diagonal  dimension  for 
square  bars,  but  in  no  case  less  than  ^  inch  from  the  exterior  surface,  nor  less  than 
shown  on  the  drawings,  or  as  required  by  Sec.  50S-S. 

505-S.  Moisture  Protection 

(a)  At  those  surfaces  of  footings  and  other  principal  structural  members  in  which 
the  concrete  is  deposited  directly  against  the  ground,  metal  reinforcement  shall  have  a 
minimum  covering  of  3  in.  of  concrete.  At  other  surfaces  of  concrete  exposed  to  the 
ground  or  to  severe  weathering  conditions,  metal  reinforcement  shall  be  protected  by  not 
less  than  2  in.  of  concrete  for  bars  over  %  in.  in  diameter,  and  l]^  in.  for  bars  5/g  in. 
in  diameter  or  less.  At  underside  of  slabs  exposed  to  weather  one  inch  shall  be  provided. 

506-S.  Splicing  of  Reinforcement 

When  it  is  necessary  to  splice  reinforcement  at  points  other  than  shown  on  the 
drawings,  the  character  of  the  splice  shall  be  determined  by  the  Engineer.  In  such  splices 
the  bars  shall  be  placed  in  contact  and  wired.  Sphces  in  adjacent  bars  shall  be  staggered. 

507-S.  Future  Bonding 

Exposed  reinforcement  intended  for  bonding  with  future  extensions  shall  be  effectively 
protected  from  corrosion. 

Construction  Joints 
508-S.  Location  of  Joints 

(a)  Columns. — Joints  in  columns  shall  be  made  at  the  underside  of  floor  members 
and  at  floor  levels.  Haunches  and  column  capitals  shall  be  considered  as  part  of  and 
continuous  with  the  floor  or  roof.  At  least  two  hours  shall  elapse  after  depositing  con- 
crete in  columns  or  walls  before  depositing  the  concrete  in  the  floor  system. 

(b)  Floors. — Construction  joints  in  the  floor  system  shall  be  located  at  or  near  the 
middle  of  the  span  in  slabs,  beams,  or  girders,  unless  a  beam  intersects  a  girder  at  this 
point,  in  which  case  the  joint  in  the  girder  shall  be  offset  a  distance  equal  to  twice  the 
width  of  the  beam  and  provision  satisfactory  to  the  Engineer  shall  be  made  for  shear  by 
the  use  of  inclined  web  reinforcement  across  the  joint. 

509-S.  Procedure  in  Forming  Joints 

The  procedure  specified  in  Sec.  416-S  for  bonding  new  concrete  to  old  shall  be  fol- 
lowed in  the  formation  of  all  joints.  The  reinforcement  shall  continue  through  the  joint. 
For  concrete  without  reinforcement,  shearing  strength  shall  be  provided  by  means  of  a 
concrete  key  or  dowel  bars  as  the  Engineer  may  direct. 


Details    of    Construction 123 

510-S.  Extra  Steel  at  Construction  Joints 

Where  a  construction  joint  is  required  in  a  section  of  a  building  more  than  100  ft. 
long  or  more  than  100  ft.  between  expansion  joints,  special  reinforcement  shall  be  placed 
at  right  angles  to  the  joint  and  extending  in  both  directions  from  the  joint  40  diameters 
in  the  case  of  deformed  bars  and  50  diameters  in  the  case  of  plain  bars.  This  reinforce- 
ment shall  be  placed  near  the  face  of  the  member  opposite  from  the  main  tensile 
reinforcement.  The  cross-sectional  area  of  such  reinforcement  shall  not  be  less  than 
O.S  percent  of  the  section  of  the  members  cut  by  the  joint. 

511-S.  Watertight  Construction  Joints 

(a)  Where  a  horizontal  construction  joint  is  required  to  resist  water  pressure,  special 
care  shall  be  taken  in  finishing  the  surface  to  which  the  succeeding  concrete  is  to  be 
bonded.  The  consistency  of  the  concrete  shall  be  carefully  controlled  so  that  it  can  be 
placed  with  a  minimum  of  puddling  with  no  free  water  showing.  The  surface  shall  be 
protected  from  loss  of  moisture  and  from  mechanical  injury.  In  applying  the  new 
concrete  the  procedure  specified  in  416-S  shall  be  followed. 

(b)  Vertical  construction  joints  shall  not  be  made  in  watertight  construction  unless 
shown  on  the  plans  or  authorized  by  the  Engineer. 


124 


Report    on    Concrete    and    Reinforced    Concrete 


Appendices 

Appendix  1 — Effect  of  Various  Substances  on  Portland  Cement 

Concrete  and   Suggested  Protective  Treatments 

Where  Required 


Substance 


Effect  on  Unprotected 
Concrete 


Protective  Treatment 


Petroleum  Oils 


Light  feul  oils  above  30° 

None — some  loss  from 

Fluosilicate,  spar  varnisn. 

Baume 

penetration 

linseed  oil,  sodium  silicate 

Volatile  oils — kerosene, 

None — considerable  loss 

Fluosilicate,  spar  varnish. 

benzine,  naphtha,  gas- 

from penetration. 

sodium  silicate,  phenol- 

oline 

formaldehyde  varnish 

Heavy  oils — 30°  Baum(^ 

None — very  slight  pene- 

None 

or  heavier 

tration 

Coal-tar  Distillates 


Phenol,  cresol,  lysol,  cre- 

Attack concrete  slowly 

Fluosilicate,  sodium  silicate, 

osote,  carbolineum 

spar  varnish,  phenol  for- 
maldehyde varnish 

Benzol,  toluol,  xylol  and 

None — some  loss  from 

Fluosilicate,  sodium  silicate, 

cumol 

penetration 

linseed  oil,  spar  varnish 

Pitch,  anthracene,  car- 

None 

None 

bonzol  and  paraffin 

Inorganic  Acid 

Sulphuric,  nitric 

Disintegrates 

Glass,  vitrified  brick  or  tile 
laid  in  litharge,  lead,  and 
rubber  give  effective  pro- 
tection   for    temperatures 
below  150°  F.  and  for  con- 
centrations of  50  %  or  less. 

Sulphurous 

>> 

Glass,  vitrified  brick  or  tile 
laid  in  litharge,  lead,  and 
rubber  give  effective   pro- 
tection for  all  concentra- 
tions. 

Hydrochloric 

" 

Lead,  rubber  only  for  tem- 

Hydrofluoric 

peratures  below  150°F  and 
for  concentrations  of  50% 
or  less. 

J 


Appendices 


125 


Appendix  1 — Continued 


Substance 


Effect  on  Unprotected 
Concrete 


Protective  Treatment 


Organic  Materials 


Acetic 

Disintegrates  slowly 

Bituminous  enamel,  phenol- 
formaldehyde  varnish, 
spar  varnish,  rubber 

Carbonic  in  water 

Attacks  concrete  slowly 

Asphalt,  bituminous,  or  coal- 
tar  paints,  fluosilicate,  so- 
dium silicate,  spar  var- 
nish, phenolformaldehyde 
varnish,  resin 

Lactic  or  tannic 

Attacks  concrete  slowly 

Above  group;  also  linseed 
oil,  and  paraffin 

Fish  oil 

Very  slight  attack 

Fluosilicate,  sodium  silicate, 

linseed  oil 
Above  group 

Lard  and  lard  oil 

>>        t>          » 

Foot  oil 

>>        »>          j> 

)i        >> 

Linseed 

Slight  attack 

None 

Resin 

"          " 

j> 

Cocoanut 

»»          ft 

Fluosilicate,  sodium  silicate, 
linseed  oil 

Olive 

>>           >» 

Above  group;  also  spar  or 
Bakelite  varnish 

Rape  seed 

>>          >» 

Above  group;  also  spar  or 
Bakelite  varnish 

Cotton  seed 

i>          >> 

None 

Almond  • 

>>          i» 

Fluosilicate,  sodium  silicate, 
linseed  oil,  varnish 

Poppy  seed 

Very  sUght  attack 

Above  group 

Walnut 

Soy-bean 

i>        >»          »> 

>>          >> 

Peanut 

"          " 

Oxalic 

None 

None 

Carbonic  (dry) 

Salts 


Soluble  inorganic  salts  attack  concrete  to  a  greater  or  less  extent  in  the  following 
order:  sulphates,  sulphides,  nitrates,  chlorides,  and  carbonates. 


Sulphates  of  calcium,  po- 

Actively attack  concrete 

Suggested  treatments  are: 

tassium,    sodium    mag- 

fluosilicate,   sodium    sDi- 

nesium,     copper,     zmc. 

cate,  linseed   oil,   bitumi- 

aluminum,   manganese. 

nous,   applications,   glass. 

iron,  nickel,  cobalt. 

vitrified  brick  or  tile  laid 
in    litharge    cement    and 
rubber 

Sulphates  of  ammonia 

Disintegrate 

Above  group 

Chlorides  of  magnesium. 

Slight  attack 

iron,    mercury,    copper 

and  ammonia 

Nitrate  of  ammonia 

Disintegrates 

"          " 

Sulphide  ores  and  pyrite 

Slight  attack 

126 


Report    on    Concrete    and    Reinforced    Concrete 


Appendix  1 — Continued 


I 


Substance 


Effect  on  Unprotected 
Concrete 


Protective  Treatment. 


Acid  sulphate 

Strong  attack 

Suggested  treatments  are: 
fluosilicate,    sodium    sili- 
cate, linseed  oil,    bitumi- 
nous   applications,    glass, 
vitrified  brick  or  tile  laid 
in    litharge    cement    and 
rubber. 

Chlorides  of  sodium, 

potassium,  calcium, 

strontium 

None 

None 

Nitrates  of  calcium, 

potassium  and  sodium 

>> 

»> 

Soluble  sulpirides  except 

sulphide  of  ammonia 

" 

" 

Carbonates 

>» 

" 

Fluorides 

>f 

" 

Silicates 

>> 

Miscellaneous 


Molasses 

Slight  attack 

Suggested  treatments  are: 
fluosilicate,    sodium    sili- 
cate, linseed  oil,   bitumi- 
nous   applications,    glass, 
vitrified  brick  or  tile  laid 
in    litharge    cement    and 
rubber 

Sulphite  liquor 

>»        >> 

Above  group 

Milk 

Attacks  slowly 

Corn  syrup  and  glucose 

Slight  attack 

"          " 

Silage  juices 

Attack  slowly 

»»          »> 

Ammonia  water 

None 

None 

Wood  pulp 

" 

" 

Tanning  liquors  (non  acid) 

>> 

" 

Alcohol 

i> 

Appendix  2 — Support  Moments  in  Continuous  Beams  and  Frames 

A  number  of  methods  of  frame  analysis  are  available  to  the  designer  such  as 
Moment  Distribution,  Slope  Deflection,  Virtual  Work,  etc.  For  preliminary  designs  and 
also  for  final  designs  in  the  ordinary  cases,  the  following  approximate  general  method 
may  be  used.  The  method  is  based  in  moment  distribution  and  is  approximate  to  the 
extent  that  it  includes  only  two  cycles  of  distribution*  for  fixed  end  moments  at  three 
successive  supports  or  joints. 


*  For  a   more  complete  treatment  of  this  method,   see   Continuous   Frames  of  Reinforced   Concrete, 
by  Cross  and  Morgan  (John  Wiley  and  Sons,  N.  Y.,  1932). 


Appendices 


127 


The  method  is  general  in  that  it  is  applicable  to  the  fixed  end  moments  for  any  type 
of  loading  in  the  four  spans  adjacent  to  the  three  supports  or  joints  under  consideration. 
For  notation  refer  to  the  following  diagram  and  definitions: 


A-o         A- 


Let  joints  1,  2,  and  3  in  the  order  shown  mark  the  ends  of  two  spans  h  and  h. 

Let  3/^2 1  =  fixed  end  moment  at  the  left  of  joint  2  due  to  the  loads  in  the  span 

between  supports  2  and  1. 
3/^2— ■;  =  fixed  end  moment  at  the  right  of  joint  2  due  to  the  loads  in  the  span 

between  supports  2  and  3. 
U2  =     algebraic   sum   of    the   fixed    end   moments   at   joint    2,    i.e.    MF,_,  -f 

Similarly. 

Ui  =:  algebraic  sum  of  the  fixed  end  moments  at  joint  1, 

Us  =  algebraic  sum  of  the  fixed  end  moments  at  joint  3. 

Fixed  end  moments  are  to  be  given  positive  sign  if  they  tend  to  produce  clockwise 
rotation  of  the  joint  and  negative  sign  if  counter  clockwise. 

The  signs  of  Ui,  U2,  and  Us  result  from  the  addition  of  the  two  terms.  If  the  clock- 
wise term  is  the  greater,  the  sign  will  be  positive;  if  the  counter  clockwise  term  is 
greater,  the  sign  will  be  negative. 

Kiz=—  :=  stiffness  factor  for  span  1-2. 

/i  ^  -  —   for  all  members  intersecting  at  joint  1. 


Similarly  for  other  joints. 

I>i_or=  Distribution  factor  at  joint  1  = 


D„_,=  Distribution  factor  at  joint  2  =:  -1^ 

J2 


£>2_:.,  ^  Distribution  factor  at  joint  2  = 
D  :;__;  =:  Distribution  factor  at  joint  3  = 


£1 
J2 

El 
J. 

Jil 

/a 


128 Report    on    Concrete    and    Reinforced    Concrete 

With  this  notation,  the  iinal  moment  M2_i  at  the  left  of  joint  2  can  be  obtained 
from  the  following  equation: 

iW,_i  =  MF,_,  _  Z)2_if/2  _j^^^^2£l+  :^2_i  (£,       j/^  ^  D;.._^Uz) (1) 

2  2 

Similarly, 

M2_3=  MF2_3_  D^_,,U2  —^l=^  +  £l=l'{D,_.,U,  +  Z),_of/i) (2) 

2  2 

Collecting  terms,  these  equations  can  be  written, 

M,_,=z  MF,_,-£a=^£i  +  £i^(D,_2U.  +  D.,_^U,  —  2U^) (3) 

2  2 

Mj_3,=  MF,_3  - ^ ^'^  ^^  +  .^  (D i_2 1/.  +  Z>3-2«7,  -  2C/.) (4) 


Appendix  3 — Maximum   Moment   Coefficients  for   One-Way   Slabs 

(Solid  or  Ribbed)  of  Equal  Spans  Carrying  Uniformly 

Distributed  Loads 

The  coefficients  given  in  the  table  below  are  for  the  special  case  of  equal  spans  and 
uniformly  distributed  loads.  They  are  based  on  the  assumption  of  continuity  over  the 
supports  with  negligible  restraints  at  end  and  intermediate  supports.  The  numerical 
values  given  are  coefficients  of  vo-i.V'  and  WiV,  respectively,  in  which  Wi  equals  the  dead 
load,  and  Wi  equals  the  live  load  per  unit  of  area. 


I 


No. 
Spans 

Rnd  Support 
Neg. 

End  Span 
Mid-Span 
Pos.       Neg. 

First  Int. 
Support 

Pos.       Neg. 

Interior  Sp 
Mid-Span 

Pos.       Neg. 

an 

Typical 
Support 

Pos.       Nei 

1 

2 

3 

4  or 

more 

—.040 
—.040 
—.040 
—.040 

.125 
.075 

.085 
.080 

Dead  Load 

—.125 
—.100 
—.110 

.030 
.040    I 
. 046* \ 

— .  0 

1 

2 

3 

4  or 

more 

—.040 
—.040 
—.040 
—.040 

.125 
.100  - 
.105  - 
.  105  - 

.000 
-.030 
-.025 
-.020 

Live  Load 

. 000  — .  125 
.017  —.120 
.015  —.120 

.  080  — .  050 
. 085  — .  045 

. 036  — . 1 

115 

*  .046  for  5  or  more  spans. 

To  adapt  the  table  for  use  in  cases  where  the  dead  load  is  slightly  different  on  the 
several  spans  Wi  may  be  taken  as  the  least  dead  load  carried  by  one  span  of  the  series 
under  consideration,  and  Wt  as  the  difference  between  Wi  and  the  greatest  unit  total  load 
on  any  of  the  spans  in  the  series. 


Appendices 


129 


* 


Appendix  4 — Curing   Portland   Cement   Concrete 

1.  General 

These  specifications  for  Heat  Curing  and  Wet  Curing  are  based  on  requirements  when 
normal  Portland  cements  are  used. 

When  moderate  low-heat  cements  are  used,  the  curing  time  herein  specified  shall  be 
increased  25  percent. 

When  high  early  strength  Portland  cement  is  used,  the  curing  period  shall  be  not  less 
than  40  percent  of  that  specified  for  normal  Portland  cement. 

2.  Heat  Curing 

Concrete,  when  deposited  in  massive  structures,  shall  have  a  temperature  of  not  less 
than  40  deg.  F. 

When  deposited  in  structures  less  than  six  feet  in  thickness  the  following  table  for 
temperatures  will  govern: 

Minimum  Temperature  of 
Temperature  of  Air  Concrete  When  Placed 

Degrees  F.  Degrees  F. 

Below  30  70 

Between  30  and  45   60 

Above  45  45 

In  freezing  weather,  or  when  there  is  likelihood  of  freezing  temperatures,  within  the 
specified  curing  period,  suitable  and  sufficient  measures  must  be  provided  for  maintaining 
all  concrete  surfaces  at  a  temperature  of  not  less  than  50  deg.  F.  for  a  period  of  not  less 
than  5  days  after  the  concrete  is  placed,  when  normal  Portland  cement  is  used,  and  not 
less  than  48  hours  when  high  early  strength  Portland  cement  is  used. 

The  temperature  of  concrete  surfaces  shall  be  determined  by  thermometers  placed 
against  the  surfaces  of  the  concrete. 

Provision  shall  be  made  in  form  construction  to  permit  the  removal  of  small  sections 
of  forms  to  accommodate  the  placing  of  thermometers  against  concrete  surfaces  at 
locations  designated  by  the  Engineer. 

After  thermometers  are  placed,  the  apertures  in  forms  shall  be  covered  in  a  way  to 
closely  simulate  the  protection  afforded  by  the  forms. 

In  determining  the  temperatures  at  angles  and  corners  of  a  structure,  thermometers 
should  be  placed  not  more  than  eight  inches  from  the  angles  and  corners. 

Temperature  readings  shall  be  taken  and  recorded  at  intervals  to  be  designated  by 
the  Engineer,  over  the  entire  curing  period  specified,  and  the  temperatures  so  recorded 
shall  be  interpreted  as  the  temperature  of  the  concrete  surfaces  where  thermometers  were 
placed. 

When  protection  from  cold  is  needed  to  insure  meeting  these  specification  require- 
ments, all  necessary  materials  for  covering  or  housing;  must  be  delivered  at  the  site  of 
the  work  before  concreting  is  started  and  must  be  effectively  applied  or  installed,  to- 
gether with  such  added  heat  furnished  as  may  be  necessary  without  depending  in  any 
way  upon  the  heat  of  hydration  during  the  first  24  hours  after  concrete  is  placed,  when 
normal  Portland  cement  is  used,  or  the  first  18  hours  when  high  early  strength  Portland 
cement  is  used. 

When  heat  is  supplied  by  steam  or  salamanders,  covering  or  housing  of  the  structure 
shall  be  so  placed  as  to  permit  free  circulation  of  air  above  and  around  the  concrete 

•Manual  Am.  Ry.  Eng.  Assn.,  1939;  Specifications  for  Portland  Cement  Concrete,  Plain  and 
Reinforced,  Sec.  8.  page  25. 


130 Report    on    Concrete    and    Reinforced    Concrete 

within  the  enclosure,  but  to  the  exclusion  of  air  currents  from  without,  excepting  that 
where  salamanders  are  used,  sufficient  ventilation  shall  be  provided  to  carry  off  gases. 
Special  care  shall  be  exercised  to  exclude  cold  drafts  from  angles  and  corners  and  from 
all  projecting  reinforcing  steel. 

When  salamanders  are  used,  water  vessels  must  be  placed  over  them  or  other  means 
provided  to  maintain  a  high  humidity  within  enclosures. 

3.  Wet  Curing 

When  not  otherwise  specified,  all  concrete  surfaces  when  not  protected  by  forms, 
must  be  kept  constantly  wet  for  a  period  of  not  less  than  7  days  after  concrete  is 
placed,  when  normal  Portland  cement  is  used,  and  not  less  than  67  hours  when  high 
early  strength  Portland  cement  is  used. 

The  wet  curing  period  for  all  concrete  which  will  be  in  contact  with  brine  drip,  sea 
water,  salt  spray,  alkali  or  sulfate  bearing  soils  or  waters,  or  similar  destructive  agents, 
shall  be  increased  to  SO  percent  more  than  the  periods  specified  for  normal  exposures. 

When  wood  forms  are  left  in  place  during  the  curing  period  they  shall  be  kept 
sufficiently  damp  at  all  times  to  prevent  openings  at  the  joints  and  drying  of  the  concrete. 

Inspection  shall  be  made  of  all  exposed  surfaces  at  intervals  as  directed  by  the 
Engineer,  and  job  records  shall  be  kept  indicating  whether  surfaces  were  wet  at  times  of 
inspection,  and  if  not  wet,  stating  reasons  why. 

When  wet  curing  is  impracticable,  liquid  surface  applications  to  prevent  or  minimize 
evaporation  may  be  used  in  lieu  of  wet  curing  only  when  approved  by  the  Engineer. 


Appendix  5 — List  of  Specifications  Cited 

American  Society  for  Testing  Materials* 

A7-39    — Specifications  for  Steel  for  Bridges  and  Buildings 
A15-39   — Specifications  for  Billet-Steel  Bars  for  Concrete  Reinforcement 
A16-35    — Specifications  for  Rail-Steel  Bars  for  Concrete  Reinforcement 
A44-39T — Specifications  for  Cast-Iron    Pit-Cast    Pipe    for    Water    and    other    Liquids 

(Tentative) 
A82-34   — Specifications  for  Cold-Drawn  Steel  Wire  for  Concrete  Reinforcement 
A160-39   — Specifications  for  Axle-Steel  Bars  for  Concrete  Reinforcement 
A184-37   — Specification  for  Fabricated    Steel    Bar    or    Rod    Mats    for    Concrete    Rein- 
forcement 
A185-37    — Specifications  for  Welded  Steel  Wire  Fabric  for  Concrete  Reinforcement 
C9-38   — Specifications  for  Portland  Cement 
C29-39   —Method  of  Test  for  Unit  Weight  of  Aggregate 
C39-39   — Method  of  Test  for  Compressive  Strength  of  Concrete 
C40-33    — Method  of  Test  for  Organic  Impurities  in  Sands  for  Concrete 
C42-39    — Method  of  Securing  Specimens  of  Hardened  Concrete  from  the  Structure 
C74-39    —Specifications  for  High-Early-Strength  Portland  Cement 
C 7 7-39   —Methods  of  Sampling  and  Physical  Testing  of  Portland  Cement 
C78-39   —Method  of  Test    for    Flexural    Strength    of    Concrete    (Laboratory    Method 

Using  Simple  Beam  with  Third  Point  Loading) 
C87-39   —Method  of  Test  for  Structural  Strength  of  Fine  Aggregate  Using  Constant 
Water-Cement-Ratio  Mortar 

f  .u*  ^AD^.'^P'^'^r  containing  the  specifications  and  methods  of  test  listed  may  be  obtained  by  members 
ot  the  AREA  at  50  cents  per  copy  by  addressing  the  American  Society  for  Testing  Materials,  260  South 
Broad  Street,  Philadelphia,  Pa. 


Appendices 131 

C88-39T— Method  of  Test  for  Soundness  of  Aggregates  by  Use  of  Sodium  Sulfate  or 

Magnesium  Sulfate  (Tentative) 
C 1 09-3  7T— Method   of   Test    for    Compressive   Strength    of    Portland    Cement    Mortars 

(Tentative) 
CI  17-37    —Method    of   Test    for   Amount    of    Material   Finer    than   No.    200    Sieve   in 

Aggregates 
C 123-39    — Method  of  Test  for  Coal  and  Lignite  in  Sand 

C136-39    — Method  of  Test  for  Sieve  Analysis  of  Fine  and  Coarse  Aggregates 
D2-33    — Method  of  Test  for  Abrasion  of  Rock  by  Use  of  the  Deval  Machine 
D75-39T — Methods  of  SampHng  Stone,  Slag,  Gravel,  Sand,  and  Stone  Block  for  Use  as 
Highway  Materials,  Including  Some  Material  Survey  Methods  (Tentative) 
D271-37    — Methods  of  Laboratory  Samphng  and  Analysis  of  Coal  and  Coke 
D289-37T^Method  of  Test    for    Abrasion    of    Gravel    by    Use    of    the    Deval    Machine 
(Tentative) 


INDEX 


Admixtures 


Recommended 
Practic^— Sect.  No. 

203,612.. 


Specifications 
Sect.  No. 


204S 


Aggregates  

Abrasion  Resistance  .  .  . 
Blast-Furnace  Slag    . . . 

Coarse 

Colored  

Cyclopean    

Deleterious  Substances 

Fine 

Fireproofing 

Grading    

Lightweight    

Mortar  Strength  Tests 
Organic   Impurities    . .  . 

Rubble    

SampUng  and  Testing  . 

Size,   Maximum    

Soundness     

Wearing  Surfaces   

Weight  per  cu.  ft 


Alkali  and  Corrosive  Fluids, 

Exposure   to    

Construction  Details  for 

Depositing  Concrete 

Protection  of  Concrete   

"  "   Reinforcement  

Water-Cement  Ratio  Requirements 

Allowable  Unit  Stresses    


Anchorage  (see  Bond  and  Anchorage) 


Beams  and  Girders 

Anchorage  of  Reinforcement  . .  .  . 
Beams  in  Flat  Slab  Construction 
"        "  Two-Way  Slab     " 

Bending  Moments   

Compression  Reinforcement    .  . . . 

Lateral  Supports   

T-  and  L-  Beams  

Wedge-Shaped  Beams   


I 


Bending  Moments 
Beams  and  Girders 
Columns  


205-212 

212 219S, 229S 

218S, 229S 

207 214S-219S 

728 

221S 

208 210S, 216S,  223S 

206 207S-213S 

211 22SS 

206,  207 208S,  209S,  21SS 

210 222S-224S,  229S 

212S, 229S 

211S, 229S 

220S 

226S-229S 

307 

209 213S,217S, 229S 

712 

218S, 224S,229S 


4218 


303, 

Table  1 

App. 

1 

501 

609 

506 

303 

878 


804-808 

826-830 

840 

815 

808,  App.  2,  3 

804 

804 

804 

822,825 

App.  2,  3 

808 

859-862 


133 


1 


134 


Index 


Flat  Slabs,  Discontinuous  Panels  

"         "      Rectangular   

Frames    

Retaining  Walls   

Slabs,  One-Way  (Solid  or  Ribbed)  . . 
"      Two-Way     (Supported     on     4 

Sides)    

Supporting    Beams   in   Two-Way    Slabs 


Bond  and  Anchorage 

Working  Stresses   . . . . 


Recommended 
Practice — Sect.  No. 

838 

835, 836 

805 

873 

806,  807 


Specifications 
Sect.  No. 


Bonding  New  and  Old  Concrete 


Cement 

Portland   

High-early-strength 
Special    


811,812 
815 

823-830 
878 


508. 


202(a) 

202(^0;,  306. 
202(b) 


416S 


201S 

202S,  309SA,  306SB 

203S 


I 
I 


Cleaning  Concrete  Surfaces 


703, 724 


Color  in  Concrete 

Aggregates   , 

Pigments 

Paints   , 


Columns,  Reinforced  Concrete 

Bending  Moments   

Combined  Axial  and  Bending  Stress   . 

Combination  and  Pipe  Columns   , 

Composite    

Limitations    

Long   

Reinforcement  Details 

Spirally  Reinforced,  Allowable  Load  . .  . 

Tied,  Allowable  Load  

Transfer  of  Loads  to  Pedestals   

Unsupported  Length   , 

Wind  or  Earthquake  Stresses 


Compression  Reinforcement 

Beams  

Flat  Slabs    


Consistency  and  Workability  of  Con- 
crete     


Construction  Details 
Cyclopean  Concrete 


727-731 
728 
727 
729-731 

851-862 

859-862,  App.  2 

860, 861 

857 

856 

852 

858 

854 

854 

855 

870 

853 

862 


S04(cJ 
845 


307 

501-514 


304SA,  305SA,  305SB 


221S,418S 


Index 

Recommended 
Practice — Sect.  No. 

Curing  Concrete   309 

Additional    Curing    to    Meet    Strength 

Requirements    

Am.  Ry.  Eng.  Assn.  Specifications  ...    .  309,  App.  4 

Field  Test  Specimens   311 

Methods  and  Requirements  309 

Dampproofing   607 

Decorative  Finishes   (see  also  Surface 

Finishes)     704-709 

Ornaments    70S,  706 

Definitions    102 

Deleterious  Substances  (see  Aggregates) 

Depositing  Concrete  (see  Placing) 

Diagonal  Tension  and  Shear 816-822 

Beams  and  Girders   817 

End  Anchorage 826-829 

Footings   821 

Slabs,  Flat   820 

"      Two-Way 813 

Web  Reinforcement,  Beams  and 

Girders    818,  819 

Wedge-Shaped  Beams 822 

Working  Stresses   878 

Drop  Panels  (see  Flat  Slabs) 

Durability  of  Concrete 303 

Earthquake 

Loads    803 

Stresses   862,  878 

Expansion  and  Contraction  of  Con- 
crete (see  also  Joints)    501 

Exposure    Requirements     for     Con- 
crete      303 

Field  Tests  of  Concrete  310, 311 .. . 

Finishing  (see  Surface  Finishes) 

Fireproofing 211 

Fire  Protection  Requirements 

Aggregates    211 

Reinforcement SOS 


135 


Specifications 
Sect.  No. 


318S 


328SA 


320S-32SS 


136 


Index 


Footings    

Combined     

Critical  Sections  

Diagonal  Tension  and  Shear  . . . 
Pedestal  and  Pedestal  Footings 

Plain    

Raft    

Transfer  of  Load  from  Column 
Working  Stresses    


Recommended 
Practice — ^Sect.  No. 

863-871 


Specifications 
Sect.  No. 


Forms 


Frames  

Bending    Moments 


Girders  (see  Beams  and  Girders) 
Impact    


Joints    (see  also  Bonding   Old  and  New 
Concrete) 

Construction    

Expansion  and  Contraction   

Location  

Long  Buildings  

L-,  T-,  or  U-Shaped  Buildings   

Retaining  Walls   

Watertight    


Lightweight  Aggregates   . . 

Loads,  Superimposed    

Measurement  of  Materials 


Mixing   Concrete    . . . . 

Equipment   

Hand  

Ready-Mixed    Concrete 

Time  of  Mixing   

Truck    


Mortar   (see  also  Pneumatically  Applied 
Mortar) 
Strength  Tests  (see  Aggregates) 
Used  for  Waterproofing  


Paints   

Pavement  Concrete,  Quality 
Pedestals  


866 
821 
871 
867 
869 
870 
864, 865,  878 

401,702 401S-406S 

804-808 
80S,  App.  2,  3 


803 


513 S08S-S11S 

509 

509 508S 

510 

510 

511,877 

514 511S 

210 222S-224S,  229S 

803 

310S 

311S-316S 

311S-314S 

316S 

308 312S,314S,31SS 

308 312S-314S 

313S 


611 

729-731 
303 
870, 871 


Index 


137 


Placing  Concrete 


Chuting    

Cold  Weather  (see  also  Curing) 

Consistency  Required    

Handling    

Pneumatic    

Pumping 

Vibration    


Recommended  Specifications 

Practice — Sect.  No.  Sect.  No. 

402-406 30SSA,  305SB, 

407S^22S 

410S 

415S 

307 
409S 

402.406 411S 

403 412S 

307,  404 


Pneumatically  Applied  Mortar 

For  Moisture  Protection 

Reinforcement    for    


Proportioning  Concrete  

By      Strength      and      Water      Content 

(Alternate   A)     

By  Fixed  Mixes  (Alternate  B)    

Wearing  Surfaces   

Protective  Treatments  for  Concrete 
(see  also  Paints)    

Ready-Mixed  Concrete  (see  Mixing) 

Reinforced  Concrete  Design   


Reinforcement,   Metal    

Clearance   and   Embedment    . . 
Columns,  Spiral  Reinforcement 

Compression  in  Beams   

Fabricating  and  Placing   

Fire  Protection   

Flat  Slab   Construction    

Moisture   Protection    .  . : 

Offsets,  Column  Reinforcement 
Pneumatically  Applied  Mortar 

Recommended   Sizes    

Splicing 

Web 

Working  Stresses   


Retaining  Walls    

Retempering  Concrete 
Rubble    Concrete    


Sea  Water,  Concrete  Exposed  to 

Construction  Details   

Exposure  Requirements    

Protection  for  Reinforcement  


406 422S 

506 
406(m) 

302 

302,  304,  312 301SA-309SA 

302,  305 301SB-306SB 

713 


601,  605-614,  App.l 


801-878 

213-216 230S,  231S 

504. 854 

854. 855 
804 

501S-504S 

505 

843-845 

506,608 S05S 

503, 854(c) 

406(m) 422S('jn; 

216 

502 506S 

818,819,830 
878 


872-877 


317S 
220S, 4198 


501 
303 
507 


138 


Index 


Recommended 
Practice — Sect.  No. 
Shear  (see  Diagonal  Tension  and  Shear) 

Shrinkage   (see  Expansion  and  Contrac- 
tion) 


Specifications 
Sect.  No. 


Slabs,  One-Way 
Two-Way 

Flat    


Soundness  of  Aggregates  

Steel  (see  Reinforcement) 

Strength    Specifications :    Enforcement 

of    Requirements    

Surface  Finishes  (see  also  Paints)   .... 

Surface  Treatments  (see  also  Protective 
Treatments)     

Terrazzo    


Testing 

Aggregates 
Concrete   . 


Unit  Stresses    

Vibration    

Water-Cement  Ratio 


Water    

Watertightness    

Wearing   Surfaces    

Weathering,  Protection  for    . . 

Web  Reinforcement    

Wind  or  Earthquake  Stresses 

Workability  of  Concrete 

(see  Consistenc)') 


804-808 
809-815 
831-8S0 

209 213S, 217S,229S 


304ra;,312. 
701-731 

613 
716-726 


326SA-328SA 


310,311 

878 

307,404,405. 
301-305 


204 

601-614 

710-726 

606 

818,819,830 

862,878 


226S-229S 
320S-325S 


305SA,  305SB 

301SA-303SA, 
304SB 

20SS,206S 


Working  Stresses 


878 


Seventh  Progress  Report 

Committee  on  Stresses  in  Railroad  Track 

1940 


139 


TABLE  OF  CONTENTS 

I.  Introduction 

Page 

1.  Preliminary     ^41 

2.  Previous  Progress  Reports   141 

3.  Acknowledgment     142 

II.  Track,  Locomotives,  Cars,  Apparatus,  and  Methods  of  Testing 

4.  Purposes  of  the  Tests   142 

5.  Tfie  Track  and  the  Test  Layout  143 

6.  I^ocomotives  and  Cars    145 

7.  Testing   Equipment    146 

8.  Operation  of  the  Tests  and  Reduction  of  the  Data  154 

III.  Stresses,  Moments,  and  Depressions  in  Rail  with  the  Electric 
Locomotive  and  the  Cars 

9.  Stresses  and  Moments  in  Rail  155 

10.  Depression  of  Track    168 

IV.  Tests  of  Rail  Joints 

11.  Rail  Joints  and  Their  Action   173 

12.  The  Joint  Bars  and  the  Test  Schedules   176 

13.  Laboratory  Tests  to  Find  Gage  and  Stress  Relations  and  Conversion  Ratios 180 

14.  Stresses  in  Rail  Joints  in  Track   185 

15.  Values  of  Moments  in  Rail  Joints  in  Track   189 

16.  Effect  of  Camber  in  Joint  with  No  Re-tamping   192 

17.  Discussion  of  Type  and  Condition  of  Bar   194 

18.  Relation  of  Speed  to  Type  and  Condition  of  Bar   201 

10.  Vertical  and  Longitudinal  Movements  between  Joint  Bars  and  Rails   204 

20.  Recapitulation  and  General  Discussion    213 

V.   Other  Tests 

21.  Effect  of  Flat  Wheel   217 

22.  Effect  of  Batter  in  the  Rail  Surface   222 

23.  Rail  Stresses  and  Depressions  with  a  Steam  Locomotive   232 

VI.  Other  Activities 

24.  Other   Activities    246 

140 


Seventh  Progress  Report 
Special  Committee  on  Stresses  in  Railroad  Track 

A.  N.  Talbot,  Chairman,        F.  S.  Hewes  Louis  Yager,  V ice-Chairman, 

C.  B.  Bronson                          G.  W.  Kittredge  W.  H.  Penfield 

W.  J.  Burton                          P.  M.  LaBach  G.  J.  Ray 

Robert  Faries**                      F.  R.  Layng  Albert  Reichmann 

C.  W.  Gennet,  Jr.                   J.  de  N.  Macomb  H.  R.  Safford 

F.  M.  Graham                          G.  M.  Magee  F.  E.  Turneaure 

H.  E.  Hale                               John  V.  Neubert*  J.  E.  Willoughby 


Committee. 


*  Died  June   4,   1940. 

**  Died  September  8,  1940. 


To  the  American  Railway  Engineering  Association: 

The  Special  Committee  on  Stresses  in  Railroad  Track  herewith  presents  its  seventh 
progress  report. 

I.  Introduction 

1.  Preliminary.— Since  its  organization  in  1914  this  committee  has  conducted 
analytical  and  experimental  investigations  on  the  action  of  railroad  track  under  the 
loads  of  locomotives  and  cars  running  at  various  speeds  and  for  a  variety  of  conditions. 
The  study  has  been  supplemented  by  numerous  laboratory  tests.  The  field,  laboratory 
and  office  work  has  been  carried  on  by  the  staff  of  the  committee.  Through  its  con- 
tinuing organization  the  committee  has  been  able  to  outline  constructive  programs, 
carry  out  field  and  laboratory  tests,  and  interpret  results  in  a  coordinated  and 
impartial  way. 

At  the  beginning  the  committee  was  a  joint  committee  of  the  American  Railway 
Engineering  Association  and  the  American  Society  of  Civil  Engineers,  with  most  of  its 
membership  common  to  the  two  societies  and  with  funds  contributed  from  both 
sources.  In  recent  years,  however,  the  connection  with  the  American  Society  of  Civil 
Engineers  has  been  only  nominal  and  the  activities  have  been  wholly  those  of  the 
American  Railway  Engineering  Association  with  the  financial  support  coming  entirely 
from  the  Association  of  American  Railroads. 

2.  Previous  Progress  Reports. — Six  progress  reports  have  been  published  de- 
scriptive of  the  investigation  and  its  results  and  various  additional  supplementary 
reports  have  been  made.  Experimental  data  in  various  stages  require  further  work  before 
being  reported. 

The  six  progress  reports  may  be  found  in  the  Proceedings  of  the  American  Railway 
Engineering  Association  as  follows:  First  Progress  Report,  Vol.  19,  1918,  page  873; 
Second  Progress  Report,  Vol.  21,  1920,  page  645;  Third  Progress  Report,  Vol.  24,  1923, 
page  29S ;  Fourth  Progress  Report,  Vol.  26,  1925,  page  1081 ;  Fifth  Progress  Report, 
Vol.  31,  1930,  page  65;  Sixth  Progress  Report,  Vol.  35,  1934,  page  65. 

An  outline  of  the  topics  reported  on  in  the  first  four  progress  reports  is  given  in 
the  Fifth  Progress  Report,  and  a  short  statement  on  the  topics  in  the  Fifth  Progress 
Report  is  included  in  the  Sixth  Progress  Report.  Most  of  these  outlines  of  content  are 
in  sufficient  detail,  taken  together  with  the  tables  of  contents,  to  enable  a  reader  to 
find  the  location  of  the  subjects  considered  in  the  various  progress  reports. 

141 


142 Stresses   in    Railroad   Track 

3.  Acknowledgment. — The  tests  herein  reported  were  made  possible  through  the 
cooperation  of  the  Pennsylvania  Railroad  in  making  a  combined  effort  to  obtain  in- 
formation on  the  action  of  various  types  of  rail  joints  in  track  when  subjected  to  the 
loads  of  locomotives  and  cars  at  speeds  up  to  90  miles  per  hour.  The  committee  wishes 
to  express  appreciation  to  the  railroad  management  for  the  opportunity  to  cooperate 
in  this  important  series  of  tests  and  for  the  various  services  given.  The  opportunities 
were  especially  valuable  because  of  the  availability  of  the  splendid  equipment  of  mag- 
netic strain  gages,  oscillographs  and  auxiliary  apparatus,  representing  an  investment  of 
a  number  of  thousands  of  dollars  and  especially  designed  and  constructed  for  the 
purposes  of  such  investigations.  This  unusual  testing  equipment  enabled  tests  to  be 
made  accurately  and  expeditiously  in  a  way  that  had  not  been  accomplished  before.  It 
should  be  added  too  that  the  extensiveness  of  the  tests  and  the  great  amount  of  detail 
in  the  large  accumulation  of  data  imposed  a  very  considerable  undertaking  in  the 
reduction  of  data  and  the  analysis  and  interpretation  of  results. 

Appreciation  is  expressed  to  W.  D.  Wiggins,  chief  engineer,  and  to  Robert  Faries, 
assistant  chief  engineer  maintenance,  Pennsylvania  Railroad,  for  their  support  in  making 
the  conduct  of  the  tests  successful.  Special  credit  should  go  to  F.  M.  Graham,  assistant 
engineer  of  standards,  who  was  actively  instrumental  in  planning,  designing  and  pur- 
chasing the  instrumental  equipment.  His  part  in  planning  and  supervising  the  tests 
was  in  itself  a  most  important  contribution  to  the  successful  conduct  of  the  tests. 
Several  members  of  the  testing  staff  of  the  Pennsylvania  Railroad  gave  valuable  service 
throughout  the  tests.  Credit  should  likewise  be  given  to  the  General  Electric  Company 
for  their  effective  interest  in  the  development  and  construction  of  special  testing 
apparatus. 

Members  of  the  staff  of  the  Stresses  in  Track  investigation  engaged  in  the  field, 
laboratory  and  office  work  should  likewise  be  given  credit.  E.  E.  Cress,  assistant 
engineer  of  tests  in  charge  of  conduct  of  field  and  office  work,  because  of  experience 
with  details,  grasp  of  the  problems  and  helpfulness  in  the  study  and  preparation  of 
the  data,  has  given  service  of  particular  value.  Randon  Ferguson,  assistant  engineer, 
through  technical  skill  and  industry  and  insight  in  field  and  laboratory  work  and  in 
the  preparation  of  material  for  the  report,  has  made  contributions  of  value.  R.  L. 
Jordan  and  V.  C.  Norman  have  likewise  been  especially  helpful  in  all  the  work  on  tests 
and  report.  Other  members  have  given  loyal  and  useful  service. 

The  University  of  Illinois  has  continued  to  cooperate  in  the  work  by  giving  the 
use  of  laboratory,  shop  and  office  facilities,  and  through  the  service  of  members  of  the 
staff  of  the  Engineering  Experiment  Station  from  time  to  time. 

Appreciation  is  expressed  to  the  Association  of  American  Railroads  for  the  financial 
support  given  to  the  investigation.  The  payment  of  the  salaries  of  the  staff  and  the 
cost  of  developing  and  purchasing  testing  equipment,  including  apparatus  obtained  since 
the  tests  herein  reported  were  made,  have  come  from  the  appropriations  made  by  the 
association.  It  must  be  realized  that  research  investigations  of  the  nature  of  those 
carried  on  involve  the  expenditure  of  considerable  sums  and  the  continuing  effort  of  a 
sizable  and  capable  and  experienced  technical  staff. 

II.  Track,  Locomotives,  Cars,  Apparatus,  and  Methods  of  Testing 

4.  Purposes  of  the  Tests. — The  tests  were  undertaken  particularly  to  obtain 
information  on  the  action  of  different  forms  of  rail  joints  in  track  under  the  traffic  of 
locomotives  and  cars  running  at  various  speeds  and  to  learn  the  magnitude  of  the 
bending  moments  developed  in  the  joint  bars  as  compared  with  those  developed  in  the 


Track    and    Test    La  \' out 


143 


full  rail  away  from  a  joint.  The  ratio  of  the  bending  moment  in  the  bar?  of  a  joint  to 
that  in  the  full  rail  (called  the  joint  moment  ratio)  may  be  considered  a  measure  of 
the  usefulness  of  the  joint  as  a  load-carrying  beam,  and  under  similar  conditions  of 
rail  support  the  joint  moment  ratio  will  give  information  on  the  relative  stiffness  of 
rail  and  joint  and  thus  on  the  extent  to  which  the  ties  at  the  joint  will  have  higher 
pressures  or  lower  pressures  applied  to  them  than  are  given  to  ties  away  from  the  joint. 
Information  was  also  desired  on  the  relative  longitudinal  movement  between  rail  and 
bar  at  the  upper  fishing  surfaces  in  the  several  forms  of  bar  with  the  passage  of  a 
wheel  over  the  joint,  as  tending  to  produce  wear  and  increased  deterioration  of  joint, 
and  also  information  on  the  relative  vertical  movement  between  rail  and  bar  at  points 
along  the  length  of  the  bar,  whether  with  well  fitting  or  poorly  fitting  bars  or  even 
worn  bars.  It  was  also  desired  to  learn  if  possible  how  speed  of  train  affects  these 
various  matters.  To  serve  as  a  basis  of  comparison,  the  stresses  and  moments  and 
depressions  of  the  full  rail  in  the  same  track  under  the  action  of  the  same  locomotive 
and  cars  were  needed. 

With  the  availability  of  track  and  locomotive  and  the  setup  of  testing  equipment, 
advantage  was  taken  of  the  opportunities  to  make  a  number  of  tests  to  judge  the 
feasibihty  of  obtaining  results  of  some  significance  on  various  other  matters,  including 
the  effect  of  batter  of  rail  and  flat  spots  and  out-of-roundness  of  wheel  upon  stresses 
in  rail,  and  also  to  make  a  number  of  tests  on  the  effect  of  counterbalance  of  a  steam 
locomotive  on  the  stresses  developed  in  rail  and  the  corresponding  rail  depressions. 

S.  The  Track  and  the  Test  Layout. — The  tests  were  conducted  on  Track  4 
(southbound  passenger)  at  a  point  about  one-half  mile  north  of  the  station  at  Elkton, 
Md.  A  distance  of  more  than  five  miles  (slightly  down  grade)  to  the  north  was  avail- 
able for  attaining  the  highest  speed  used  and  an  adequate  distance  to  the  south  for 
stopping  the  locomotive.  The  test  site  was  on  a  14-min.  curve  to  the  right  with  super- 
elevation of  V/i  in.  Ahead  of  and  behind  this  curve  the  compound  curve  became 
i3>  min.  The  total  curve  extended  over  a  distance  of  about  a  mile.  New  131-lb.  R.E. 
rail  was  placed  in  track  over  the  distance  A  in  Fig.  1  on  May  28,  1937;  these  rails  had 
been  predrilled  for  the  stress  gages.  The  normal  tie  spacing  was  22  ties  to  the  39-ft. 
rail,  but  in  February,  1937,  the  ties  were  slightly  re-spaced  at  gage  locations  4,  S  and  6 
in  order  that  the  instruments  might  be  attached  to  the  base  of  the  rails  at  ten-foot 
intervals.  The   test  site  is  situated   on   a   relocation   of  the  main  line   built   in    1934,  at 


Southbound 


i B  - 


Ballasted   Deck   Bridge 
^East  Rail 


Track  No.  4 


'  lOrlO'r 


IChi 


Jt.  Loc.  2 
J.  Loc.  I     Jt.  Loc.  3 


Gage    Location  4  t)   6 


-A 

H 

Pole  44.26 


'West  Rail 


D 


B 


0°-l4'  Curve    to    the 
1 2  in.   superelevation. 


Test  House 
right 


ki 


A.  New   131-lb.  R.E.  rail  placed 
in    track    May  28,  1937. 
Worn   rail   and   bars    from    RR.R. 
Middle  Division  (131-  lb  R.E.  May  1933) 
put  in  track   July  2, 1937.     The    worn 
rails    still  in    track    July  17. 

Fig.  1. — Sketch  Showing  General  Layout  of  the  Test  Location  on  the  Pennsylvania 
Railroad  near  Elkton,  Md. 


144 


Stresses    in    Railroad    Track 


which  time  entirely  new  track  was  laid.  Large  trap  rock  ballast  is  reported  to  extend 
18  in.  under  the  bottoms  of  the  ties  on  four  feet  of  cinders.  The  sawn  oak  ties  arc 
7  in.  by  8  in.  by  8  ft.  6  in.  The  heavy  double-shoulder  tieplates  are  lYz  in.  by  14)4  in. 
Generally  four  driven  spikes  were  used  at  a  tieplate.  At  the  test  location  there  is  about 
IS  ft.  of  fill  to  the  west  of  Track  4,  and  S  ft.  of  fill  to  the  east  of  Track  1.  The  track 
had  been  maintained  in  excellent  condition;  in  all,  it  was  a  stiff  substantial  track  well 
above  the  ordinary.  The  track  carried  many  fast  passenger  trains.  There  was  the  usual 


Fig.  2. 


-General  View  of  Test  Site  on  the  Pennsylvania  Railroad  near 
Elkton,  Md. 


variation  in  play  along  the  track  from  tie  to  tie  between  rail  and  tie  plate  or  between 
rail  and  the  ballast  always  found  even  on  high  grade  track.  At  the  places  where  the 
track  depression  was  measured,  the  modulus  of  elasticity  of  rail  support  u  averaged 
2,500  lb.  per  in.  In  all  it  was  a  very  stiff  track  even  though  the  fill  was  relatively  new 
and  not  fully  compacted. 

The  general  layout  of  the  test  location  is  shown  in  Fig.  1  and  a  view  in  Fig.  2. 
The  test  house  was  conveniently  located  close  to  the  positions  on  the  track  where  the 
recording  instruments  were  placed.  The  wire  leads  extended  from  the  instruments  on 
the  track  to  the  recording  apparatus  in  the  test  house.  The  six  gages  measuring  longi- 
tudinal stress  at  the  middle  of  the  base  of  the  rail  and  the  six  solenoid  rail  depression 
gages  were  located  on  opposite  rails  at  gage  locations  4,  S  and  6  spaced  at  10-ft.  intervals. 

The  tests  on  the  rail  joints  were  made  at  joint  Locations  1,  2  and  3,  Locations  1  and  3 
being  consecutive  joints  in  the  west  rail  and  Location  2  being  in  the  east  rail  between 
the  other  two.  The  special  test  joint  bars  were  installed  from  day  to  day  in  the  track 
at  these  three  locations.  Generally  three  pairs  of  bars  of  identical  sections  were  placed 
in  the  three  joint  locations.  One  type  of  measuring  gage  was  placed  on  the  bars  in 
joint  Location   1,  another  type  on  the  bars  at  Location  2,  and  the  remaining  gages  on 


Locomotives    and    Cars 


145 


the  bars  in  Location  3,  all  three  sets  of  gages  operating  for  a  locomotive  test  run. 
Later  the  gages  were  twice  interchanged  so  that  all  three  types  of  gage  were  used  on 
each  joint,  and  runs  were  repeated  for  each  of  the  three  arrangements. 

6.  Locomotives  and  Cars. — In  the  principal  tests  Electric  Locomotive  4779  of 
the  PSa  class  (4—6-4)  was  used,  except  that  Locomotive  4790  of  the  same  class  was 
substituted  for  one  day.  The  wheel  spacing  and  the  average  of  the  weighed  wheel  loads 
lor  each  axle  are  given  in  Fig.  3.  A  view  of  the  locomotive  is  shown  in  Fig.  4.  This 
passenger  locomotive  has  nominal  wheel  loads  of  19,300  lb.  on  the  front  truck  wheels, 
38,000  lb.  on  the  driving  wheels,  and  22,400  lb.  on  the  rear  truck  wheels.  The  spacing 
of  the  72-in.  drivers  is  seen  to  be  10  ft.  and  the  rigid  wheel  base  is  20  ft.  The  frame 

Electric    Locomotive    4779,  PSa    Class 


■6'-  IO"4-8'-  /"—I—  10'    0"—\~IO'-  0'^\-a'-  l'~\-6'-IO'-\ 
49'- 10' 


Diameter  of  drivers    7Z  in 

Locomotive   6718,  Mia    Class 


DIomtler  of  dritrers    72  in. 


Crank  pin  radius    15  In, 


Fig.  3. — Diagrams  of  Wheel  Spacings  and  Wheel  Loads  of  Locomotives  Used  in  the  Tests 
on  the  Pennsylvania  Railroad  near  Elkton,  Md. 


.^ 


Fig.  A. — View  of  Electric  Locomotive  4779. 


146 Stresses    in    Railroad    Track 

supports  a  single  cab  that  extends  the  length  of  the  locomotive.  A  twin  armature  motor 
is  mounted  over  each  of  the  three  driving  axles.  The  armature  shafts  are  geared  to 
quills  which  turn  the  wheels  through  spring  cups.  The  three  motors  will  develop 
3,750  hp.  continuously.  There  are  no  mechanical  connections  between  the  driving  axles. 
The  power  is  supplied  from  an  overhead  line  of  11,000  volts  at  25  cycles. 

The  individual  wheels  of  Locomotive  4779  were  weighed  on  locomotive  scales  in 
1935.  For  the  right  side,  starting  at  the  front  end,  the  wheel  weights  were  16,300,  16,000, 
41,800,  40,200,  39,500,  19,700  and  19,700  lb.,  respectively.  For  the  left  side,  also  starting 
at  the  No.  1  end,  the  wheel  weights  were  22,400,  22,600,  34,200,  36,300,  36,100,  25,100 
and  25,100  lb.,  respectively.  It  is  to  be  expected  that  the  individual  wheel  weights  will 
vary  from  time  to  time.  The  weights  given  above  differ  from  the  nominal  weights. 
The  unsprung  weight  for  each  driving  axle  was  reported  to  be  13,500  lb. 

Steam  Locomotive  6718,  a  fast  freight  engine  of  the  Mia  class  (4-8-2),  was  used 
for  one  set  of  tests  with  the  rail  stress  and  depression  gages  at  speeds  of  5  and  75 
miles  per  hour.  The  locomotive  had  the  individual  wheels  weighed  on  scales  in  1935. 
For  the  right  side,  starting  at  the  head  end,  the  wheel  weights  were  14,700,  14,600,  30,900, 
33,800,  34,600,  34,900  and  26,100  lb.,  respectively.  For  the  left  side  the  corresponding 
loads  were  13,500,  14,000,  33,000,  34,700,  31,900,  36,300  and  34,600  lb.  The  wheel  spacing 
and  the  average  of  the  weighed  wheel  loads  for  each  axle  are  shown  in  Fig.  3.  The  72-in. 
driving  wheels  were  reported  to  have  an  unsprung  weight  of  8,250  lb.  for  each  main 
wheel  and  from  6,500  to  6,850  for  the  others.  Both  the  second  and  third  pairs  of  driving 
wheels  are  equipped  with  flangeless  tires.  The  center  of  gravity  of  the  locomotive  is 
given  as  isyz  in.  above  the  rail.  The  tender  is  especially  large  and  heavy,  holding 
22,000  gallons  of  water  and  31  tons  of  coal.  When  loaded  the  weight  on  each  of  the 
12  tender  wheels  would  average  32,000  lb.  At  the  start  of  the  test  day  there  were 
21,000  gal.  of  water  and  a  full  load  of  coal  in  the  tender.  After  the  last  run  about 
7,000  gal.  of  water  and  11  tons  of  coal  had  been  used. 

In  several  tests  the  electric  locomotive  pulled  a  heavy  and  a  light  car.  The  heavy 
car  was  a  70-ton  coal  hopper  car  (class  H21a)  overloaded  with  company  coal,  the 
average  weight  per  wheel  being  26,500  lb.  The  light  car  used  in  several  tests  was  an 
empty  steel  box  car  equipped  with  non-harmonic  truck  2DF12  with  combination  helical 
and  eUiptical  springs.  The  average  weight  per  wheel  was  about  6,000  lb. 

7.  Testing  Equipment. — The  magnetic  strain  gages  and  the  greater  part  of  the 
auxiliary  equipment  used  in  the  tests  were  the  property  of  the  Pennsylvania  Railroad. 
Much  of  this  equipment  was  developed  jointly  by  the  Pennsylvania  Railroad  Laboratory 
and  the  General  Electric  Company  and  constructed  by  the  latter.  The  testing  equip- 
ment constitutes  a  marked  advance  in  the  means  for  obtaining  information  on  high 
speed  phenomena. 

The  test  equipment  consisted  chiefly  of  three  types  of  magnetic  strain  gages 
designed  for  the  measurement  of  (1)  stresses,  (2)  small  movements  and  (3)  depressions 
of  track  and  also  auxiliary  apparatus  required  for  the  operation  of  these  three  types 
of  gages.  The  auxiliary  electrical  apparatus  consisted  principally  of  two  six-element 
oscillographs  for  recording  gage  indications,  various  power  supplies,  and  necessary 
meters,  switches,  resistances  and  miscellaneous  instruments  and  tools.  A  darkroom  fitted 
out  for  the  development  of  the  films  was  one  of  the  valuable  facilities  on  the  test 
location.  Special  instruments  and  tools  were  on  hand  for  such  static  tests  and  incidental 
measurements  as  were  required.  A  small  work  shop  at  the  test  stretch  and  various 
portable  machine  tools  aided  in  the  conduct  of  the  tests  and  the  maintenance  of 
equipment. 


Testing    Equipment 


147 


A  magnetic  circuit  in  which  the  lines  of  magnetic  force  must  travel  through  both  a 
magnetic  material  and  an  air  gap  has  a  major  part  of  its  reluctance  in  the  part  of  the 
path  that  is  through  the  air  gap  even  if  that  part  of  the  path  is  very  short.  Therefore, 
a  small  change  in  the  length  of  the  air  path  will  have  a  relatively  large  effect  on  the 
total  reluctance  of  the  circuit  and  on  the  current  in  the  windings.  This  fact  is  the  basis 
of  all  the  magnetic  strain  gages  used  in  these  tests  and  previous  tests.'  *  Three  types  of 
gages  were  used  that  differed  principally  in  the  range  of  movement  they  were  designed  to 
measure,  their  sensitivity  and  the  mounting  attachments  for  applying  them  to  the 
test  pieces. 

A  diagrammatic  circuit  for  one  gage  is  shown  in  Fig.  5.  The  indicating  gage,  it 
may  be  noted,  is  a  part  of  an  alternating  current  bridge  circuit  with  a  power  supply 
to  the  bridge  of  2,000  cycles  frequency  and  4  to  24  volts.  Sixteen  volts  provided  suffi- 
cient sensitivity  and  was  used  throughout  the  tests.  This  high  frequency  extends  the 
frequency  response  range  of  the  gage  and  increases  the  sensitivity.  The  balancing  gage 
shown  in  the  other  side  of  the  bridge  circuit  is  an  exactly  similar  gage  but  is  set  to  a 
definite  and  fixed  air  gap  and  mounted  in  the  test  house.  This  duplication  of  the 
indicating    gage    was    necessary    to    obtain    the    proper    balancing    of    the    bridge.  The 

Motor    Generator   'jet 


2000    Cycle    Rller 
Fig.  S. — Diagrammatic  Circuit  of  One  Magnetic  Strain  Gage. 


balance  of  an  alternating  current  bridge  is  affected  not  only  by  the  bridge  proportions 
but  by  the  wave  shape  and  phase  relations  of  the  currents  as  well.  The  other  two  arms 
of  the  bridge  marked  'Balancing  Transformer"  are  designed  to  give  to  this  part  of  the 
bridge  electrical  characteristics  similar  to  the  two  gages  in  the  other  two  arms.  The 
oscillograph  galvanometer  is  connected  between  the  two  gages  and  the  balancing 
transformers,  and  with  the  bridge  balanced  no  current  or  a  very  small  current  will  flow 
through  the  galvanometer.  Interposed  between  the  galvanometer  and  the  bridge  arms 
is  seen  a  rectifier  and  filter  circuit.  The  rectifier  makes  the  2,000-cycle  current  from  the 


'  Sixth  Progress  Report,  Special  Committee  on  Stresses  in  Railroad  Track,  Proceedings,  American 
Railway  Engineering  Association,  Vol.  35,  1934,  page  130,  Chapter  III.  "Tests  of  Rail  Joints  on  the 
Pennsylvania    Railroad." 

*  "Rail  Stresses  and  Locomotive  Tracking  Characteristics  Found  in  Tests  on  the  Great  Northern 
Railway"  by  J.  Paul  Shamberger  and  B.  F.  Langer,  Bulletin  No.  339  (September,  1931)  American 
Railway  Engineering  Association. 


148 Stresses    in    Rai  Iroad   Track 

bridge  uni-directional  and  the  filter  which  has  a  high  impedance  to  current  of  2,000 
and  4,000-cycle  frequency  smooths  out  the  rectified  current  including  any  second  order 
harmonics.  The  bridge  is,  of  course,  not  operated  by  adjusting  the  galvanometer  current 
to  zero  when  an  unbalance  results  from  a  stress  change,  but  instead  the  variation  of 
current  from  the  unbalance  is  recorded  by  the  oscillograph  and  these  variations  are 
interpreted  by  the  calibration  curves  as  will  be  discussed  later.  This  description  covers 
the  essentials  of  the  gage  circuit.  Of  course,  various  resistances,  meters,  switches  and 
other  equipment  aided  in  the  adjustment  and  control  of  the  setup  but  were  merely 
details  incidental  to  the  efficient  operation  of  the  apparatus. 

For  the  tests  there  were  available  twelve  2J4-in.  strain  gages  of  the  sensitivity 
required  for  the  measurement  of  stress.  A  view  of  two  of  these  strain  gages  for  measur- 
ing stresses  attached  to  a  joint  bar  at  position  B  and  C  is  shown  in  Fig.  6.  As  the  effec- 
tive range  of  travel  was  limited,  each  individual  gage  was  calibrated  to  be  used  at  a 
place  where  the  highest  values  of  the  stresses  were  always  tension  or  compression,  as 
the  case  might  be,  depending  on  the  position  of  the  given  gage  on  the  test  piece.  The 
reason  for  this  practice  will  be  shown  more  clearly  later.  These  gages  for  stress  measure- 
ment were  calibrated  for  three  sensitivities:  the  gages  gave  a  deflection  on  the  film  of 
approximately  1  in.  for  10,000,  20,000,  or  30,000  lb.  per  sq.  in.  stress.  The  sensitivity 
used  for  most  of  the  tests  was  1  in.  deflection  for  a  stress  of  20,000  lb.  per  sq.  in. 

Six  gages  were  designed  to  measure  movements  between  the  bar  and  the  rail  at 
the  upper  fishing  surfaces,  two  gages  being  for  the  measurement  of  the  relative  longi- 
tudinal movement  at  the  rail  ends  and  four  gages  to  measure  the  vertical  movement 
at  the  two  rail  ends  and  the  two  ends  of  the  bar.  These  gages  are  suitable  to  measure 
a  greater  range  of  movement  than  those  used  for  stresses  and  had  a  lesser  sensitivity. 
The  range  of  movement  that  can  be  measured  with  this  type  of  gage  is  about  0.05  in. 
and  the  sensitivity  was  adjusted  so  that  a  change  of  0.01  in.  gave  1  in.  deflection  on 
the  film.  Views  of  the  movement  gages  attached  to  a  joint  bar  are  shown  in  Fig.  7. 
The  gages  for  measuring  longitudinal  movement  {Ls  and  Z-e)  are  shown  in  the  upper 
view  and  those  for  measuring  vertical  movement,  (Fi,  V2,  Va  and  V4)  in  the  lower  view. 
In  both  views  a  gage  for  measuring  stress  is  attached  to  the  lower  part  of  the  bar 
at  position  C,  also  indicating  the  position  of  the  wheels  along  the  track  for  interpretation 
of  the  movement  records. 

Six  magnetic  gages  called  solenoid  depression  gages  were  available  for  measuring 
depressions  of  the  rail.  The  solenoid  depression  gages,  so  far  as  known,  are  the  first 
instruments  to  record  satisfactorily  the  depressions  of  rail  at  such  high  speeds  as  90 
miles  per  hour.  The  construction  of  these  gages  differs  from  the  magnetic  strain  gages 
for  measuring  stresses  and  small  movements,  as  can  be  seen  in  the  views  shown  in 
Fig.  8.  The  upper  view  is  the  gage  itself  and  the  lower  view  shows  it  attached  to  the 
rail  and  to  a  channel  supported  on  steel  posts  fixed  in  the  roadbed.  The  part  marked  A 
in  the  upper  view  is  attached  to  the  base  of  the  rail  when  in  use  and  the  cylindrical 
armature  B  moves  up  or  down  in  the  solenoid  coil  C,  the  coil  being  mounted  on  the 
channel  D.  The  movement  of  the  armature  has  an  effect  on  the  current  in  the  bridge 
circuit  similar  to  the  change  of  the  air  gap  in  the  other  type  gages.  The  channel  sup- 
porting the  coil  part  of  the  instrument  was  mounted  on  the  posts  in  such  a  manner 
that  the  passage  of  the  locomotive  caused  little  deflection  of  the  channel.  The  channel 
was  mounted  on  posts  driven  deep  into  the  earth  below  the  track.  These  posts  were 
driven  through  pipes  that  freed  them  from  contact  with  the  ballast  and  other  track 
support  for  a  distance  of  about  six  feet  below  the  base  of  the  rail.  These  solenoid 
gages  are  relatively  insensitive  compared  with  the  other  gages  but  have  a  much  larger 


Testing    Equipment 


149 


Fig.  6. — ^View  of  Two  Magnetic  Gages  Attached  to  a  Joint  Bar  at  Positions  B  and  C. 


Fig.  7. — Views  of  Two  Longitudinal  Movement  Gages  and  Four  N'crtical  Movement 

Gages  on  a  Rnil-Joint. 


150 Stresses    in    Railroad    Track 

effective  range  of  indication.  Movements  of  one  inch  can  be  measured  without  de- 
parture from  the  straight  Kne  portion  of  the  calibration  curve  to  any  serious  extent. 
For  the  tests  a  sensitivity  was  used  that  gave  a  four  to  one  magnification  of  the  rail 
movement  on  the  film. 

The  indications  of  the  gages  were  recorded  on  two  six-element  portable  oscillo- 
graphs designated  as  Oscillographs  A  and  B  for  these  tests  and  located  in  the  test 
building.  The  oscillograph  galvanometers  have  very  small  mirrors  that  rotate  propor- 
tionally to  the  current  in  the  circuit  and  the  deflections  of  a  light  beam  from  the  mirror 
due  to  this  rotation  are  recorded  on  a  moving  strip  of  film  six  inches  wide  by  five  feet 
in  length.  The  film  in  the  oscillographs  was  driven  from  a  shaft  common  to  both 
oscillographs  so  both  films  had  similar  time  scales.  A  timing  vibrator  in  each  oscillograph 
made  a  timing  record  on  the  film  from  a  clock  giving  half-second  intervals  or  from 
the  power  line  giving  one-sixtieth  second  intervals.  Fig.  9  is  a  picture  taken  inside 
the  test  building  showing  the  oscillographs,  which  may  be  seen  on  the  bench  to  the 
right  center,  and  the  various  balancing  gages,  resistances,  transformers,  meters  and  other 
equipment.  At  the  extreme  right  beside  the  oscillographs  may  be  seen  a  gear  box  in 
the  film  driving  system  that  made  available  ten  driving  speeds  for  the  film  to  suit 
the  various  speeds  used  in  the  tests.  The  darkroom  for  developing  the  fi  m  was  in 
this  building  but  is  not  visible  in  the  picture. 

The  2,000-cycle  current  for  the  gages  was  obtained  from  a  motor-generator  set 
operated  from  a  utility  power  line  extended  to  the  test  site  for  the  tests.  Direct  current 
was  available  in  large  quantities  with  voltages  up  to  80  volts  from  a  group  of  car 
lighting  batteries.  A  tungar  charger  operating  on  the  power  line  kept  these  batteries 
charged. 

The  gages  for  measuring  stresses  and  movements  were  attached  to  the  rails  or  bars 
by  means  of  studs  that  screwed  into  tapped  holes  in  the  rails  or  bars  or  spacer  blocks. 
Because  of  the  large  number  of  joints  tested  and  the  number  of  gages  used,  the 
drilling,  tapping  and  facing  of  the  various  bars,  rails  and  spacer  blocks  was  a  major 
item  of  the  labor  incidental  to  the  tests.  Various  portable  drills,  facing  tools,  templets 
and  jigs  were  available  for  this  work. 

The  several  types  of  electric  strain  gages  were  in  general  calibrated  by  mounting 
the  gage  on  some  mechanical  device  by  which  the  gage  length  could  be  changed  by 
known  increments  of  movement  and  readings  of  galvanometer  deflection  observed  on 
the  ground  glass  screen  of  the  oscillograph.  This  deflection  corresponded  to  that  which 
would  be  recorded  on  the  film  when  the  film  replaced  the  ground  glass  screen.  For  the 
calibration  of  the  strain  gages  for  indicating  stress  a  modification  of  the  purely  me- 
chanical method  of  calibration  was  used.  Johansson  gage  blocks  gave  standard  readings 
by  means  of  a  very  sensitive  magnetic  strain  gage  and  microammeter.  The  gage  and 
meter  were  then  used  as  a  sensitive  secondary  standard  to  move  the  gage  being  calibrated 
a  known  increment.  These  calibrations  and  certain  preliminary  work  to  determine  some 
characteristics  of  the  equipment  and  the  relative  importance  of  some  of  the  details  of 
operation  occupied  a  considerable  time.  However,  this  work  gave  the  members  of  the 
staff  a  thorough  familiarity  with  the  capabiHties  and  limitations  of  the  equipment  and 
it  was  possible  from  the  results  of  the  work  to  avoid  some  important  sources  of  error 
that  would  have  arisen  from  an  incomplete  knowledge  of  the  equipment. 

The  calibration  of  the  strain  gages  for  measuring  stress  required  the  greatest 
amount  of  care  and  accuracy.  For  a  given  calibration  the  balancing  gage  in  the  test 
house  was  set  to  a  definite  air  gap,  the  optimum  amount  of  which  was  determined  as 
a  result  of  the  preUminary  experimental  work  mentioned  above  and  the  resistance 
adjusted  by  a  few  trials  to  give  the  required  sensitivity.  The  indicating  gage  was  then 


Testing    Equipment 


ISl 


Fig.  8. — ^Views  of  Solenoid  Depression  Gages. 


Fig.  9. — Recording  and  Auxiliary  Equipment  in  Test  Building. 


152 


Stresses    in    Railroad    Track 


|J3 


■a;  p 


0 


\ 

V 

y 

y 

/ 

^ 

\ 

. 

c 
.o 

3 

/ 

y 

/ 

y 

\ 

k 

• 

^ 
5 

?, 

/ 

/ 

— 

.H' 

/ 

c'\ 

■ 

^ 

/ 

ft 

Compression 

\ 

Tension 

^  1 

*  i 

\ 

, 

/ 

\                  1           "     ' 

,r    ,1     , 

\ 

z 

z 

/ 

1       .           1 

-40 

-30   -20     -10 

0\    10 

-10  /O     \  iO    \  20    1  30 

40 

Working    Stress 

\\ 

A           Working    Stress 

!    1 

|t\ 

/^           i          !          1 

1 

60    50    40    30    20     10      0      10    20    50    40    50   60     70    80    90    100  110   120 
Stress   in    Thousands   of   lb.  per  sq.  in 

Fig.  10. — Typical  Calibration  Curves  of  One  Gage. 


compared  with  the  high  sensitivity  secondary  standard  instrument  through  the  useful 
range  of  travel  of  the  gage.  A  typical  calibration  curve  thus  obtained  is  shown  in  Fig.  10, 
The  ordinates  are  deflections  of  the  galvanometer  on  the  oscillograph  screen  in  inches 
and  the  abscissas  are  changes  in  the  air  gap  of  the  gages  converted  for  greater  con- 
venience into  stress  in  pounds  per  square  inch  for  a  2j4-in-  gage  length.  Ordinarily  a 
calibration  was  run  for  only  the  right  or  left  half  of  the  curve.  The  side  used  depended 
on  the  position  selected  for  the  gage  to  be  used.  The  nominal  constant  for  the  curve 
shown  is  20,000  lb.  per  sq.  in.  stress  for  a  deflection  of  1  in.  on  the  film. 

Inspection  of  the  calibration  curve  in  Fig.  10  reveals  several  important  characteris- 
tics of  this  gage  governing  the  reduction  of  any  data  taken  from  it.  The  deflection 
never  reverses  direction  but  reaches  a  minimum  value  called  the  electrical  zero.  This 
electrical  zero  in  the  figure  is  practically  the  zero  deflection  of  the  galvanometer  in- 
dicating a  very  small  current  and  good  bridge  balance.  There  is  no  reversal  of  galvano- 
meter deflection  because  the  rectifier  in  the  galvanometer  circuit  always  converts  the 
alternating  current  from  the  gage  in  the  same  manner  so  that  only  the  amount  of 
current  varies  and  not  its  direction.  It  is  desirable  to  have  this  minimum  deflection  as 
small  as  possible.  A  large  deflection  shows  a  lack  of  balance  in  the  bridge  and  if 
caused  by  unbalanced  harmonics  may  cause  a  wide  trace  on  the  film.  In  the  vicinity 
of  the  point  of  minimum  deflection  the  line  is  curved  and  the  instrument  relatively 
insensitive  to  changes  of  stress  so  that  this  region  is  unsuitable  for  use  in  measuring 
stress.  On  the  right  side  of  the  figure  the  curve  is  approximately  straight  between 
points  c  and  t  and  this  part  was  selected  for  the  operating  range  of  the  gage  when  the 
maximum  values  of  the  stresses  to  be  measured  were  in  tension.  If  the  reverse  condition 
of  stress  prevailed,  a  similar  portion  on  the  left  side  was  selected  as  indicated  by  the, 
points  c'  and  t' .  \ 

A  point  2  (or  z')  was  picked  on  the  straight  line  portion  of  the  curve  as  the  point 
of  zero  load  stress  with  the  gage  in  position  on  the  test  piece  with  no  load  so  that  the 
maximum  limits  of  tension  t  and  compression  c  expected  would  fall  on  suitable  parts  of 


Testing    Equipment  153 


the  calibration  curve.  The  adjustment  of  the  deflection  to  the  proper  value  for  zero 
stress  was  effected  by  adjusting  the  air  gap  of  the  indicating  gage  with  no  load  on  the 
test  piece.  If  the  point  s  is  located  too  far  up  on  the  curve  as  would  be  necessary 
when  the  gage  is  located  in  such  a  position  that  the  compression  stresses  are  the  greater, 
the  larger  current  flowing  in  the  gage  circuit  during  calibration  causes  errors  in  the 
indications  that  are  dependent  on  the  length  of  time  the  power  is  applied  to  the  gage. 
This  difficulty  was  avoided  by  using  the  other  side  of  the  curve  for  cases  where  the 
highest  stresses  are  compressive  and  locating  a  similar  point  2'  of  zero  load  stress  as 
low  as  feasible  on  the  left  hand  portion  of  the  curve. 

With  the  position  of  zero  load  stress  properly  selected  a  calibration  constant  can 
be  determined  from  the  slope  of  a  straight  line  through  2  drawn  to  minimize  as  much  as 
possible  the  effect  of  the  slight  curvature  in  the  calibration  curve.  The  value  of  error 
selected  as  permissible  was  ±  500  lb.  per  sq.  in.  To  keep  within  this  limit  it  was  usually 
necessar>'  to  use  a  different  slope  to  determine  the  constant  for  compressive  stress  reduc- 
tion than  the  slope  for  tensile  stress  reduction.  Of  course,  the  calibration  curve  itself 
could  have  been  used  for  the  determination  of  the  stress  from  every  individual  deflection 
and  thus  have  eliminated  the  error  caused  by  the  curvature  but  the  volume  of  data 
taken  would  have  made  the  reduction  unduly  long  and  the  refinement  was  deemed 
unnecessary.  The  range  of  travel  of  the  gage  can  be  judged  from  the  figure.  For  gage 
lengths  other  than  2%  in.  it  should  be  remembered  that  the  range  of  unit  stress 
measured  will  be  in  inverse  proportion  to  the  change  of  gage  length. 

During  the  tests  the  location  of  the  point  2  (point  indicating  zero  load  stress  in  the 
member)  was  found  to  shift.  This  was  due  to  one  or  all  of  several  causes,  the  most 
important  of  which  were  change  of  temperature  and  adjustment  of  newly  applied  joint 
bars  under  traffic.  It  was  therefore  essential  to  take  readings  at  the  oscillograph  screen 
from  time  to  time  to  determine  the  position  of  the  point  2  on  the  calibration  curve, and 
get  the  proper  calibration  constant  for  this  position  to  reduce  the  results  from  the 
records  affected.  This  procedure  was  necessary  to  keep  the  accuracy  of  the  reduction 
within  the  limits  of  ±  500  lb.  per  sq.  in.  When  the  point  z  shifted  unduly  it  was  reset 
to  the  most  desirable  position.  The  shift  was  made  by  resetting  the  air  gap  of  the 
indicating  gage  in  the  track  according  to  the  directions  of  the  oscillograph  operator. 
The  resetting  was  facilitated  by  the  telephone  system  between  the  test  building  and  the 
gage  locations.  An  effort  was  made  to  keep  the  shift  below  such  amounts  as  would 
require  the  use  of  a  different  calibration  constant  but  since  four  to  seven  runs  were 
made  on  a  film  before  the  positions  could  be  checked  the  shift  sometimes  exceeded 
the  limits  desired.  It  is  obvious  from  the  above  discussion  that  a  continuous  and 
accurate  record  must  be  kept  in  regard  to  the  position  of  the  point  of  zero  stress  on 
the  calibration  curve  to  use  these  gages  and  keep  within  the  limits  of  accuracy  required 
for  most  purposes. 

The  gages  were  found  to  be  rugged  and  unaffected  by  vibration.  They  were 
reliable  and  it  is  judged  they  gave  sufficiently  accurate  results  with  the  proper  manipula- 
tion and  understanding  of  their  capabilities  and  limitations.  The  complication  of  the 
auxiliary  apparatus  and  its  quantity  limit  the  applicability  of  the  gages  for  many 
purposes.  However,  the  gages  are  a  very  valuable  tool  for  measurements  of  small 
changes  of  length  that  take  place  rapidly  and  in  many  cases  the  information  obtainable 
by  their  use  will  justify  the  expense  and  time  involved.  The  method  of  recording  gives 
a  definite  time  scale  and  if  desired  the  time  scale  can  be  enlarged  to  separate  changes 
occurring  very  quickly. 

Various  instruments  and  equipment  were  u:ed  for  incidental  mea.'^urements  and 
tests.  These   include   portable   strain    gages    for   static    measurements   of   movements   or 


154 Stresses    in    Railroad    Track 

strains,  profile  indicators  for  the  rail  running  surface  and  the  bar  fishing  surfaces,  a 
level  rod  graduated  in  0.01  in.  for  measuring  static  depressions,  a  camera  equipped  with 
a  20-in.  telephoto  lens  for  measuring  depression  of  the  track,  and  various  dial  gages, 
electrical  meters  and  other  equipment. 

8.  Operation  of  the  Tests  and  Reduction  of  the  Data. — The  test  equipment 
used  was  complicated  and  elaborate.  Before  the  start  of  the  field  tests  the  entire  equip- 
ment was  assembled  at  the  test  plant  at  Altoona  and  calibrated.  All  contemplated  field 
operations  were  thoroughly  coordinated  at  this  time.  By  this  procedure  the  members 
of  the  field  party  became  so  familiar  with  the  apparatus  and  its  operation  that  practically 
no  trouble  or  delay  was  experienced  throughout  the  field  tests  due  to  the  apparatus. 
So  far  as  known,  the  testing  equipment  is  the  most  elaborate  ever  assembled  for  a 
study  of  the  action  of  railroad  track. 

In  making  a  typical  test  the  duties  of  each  member  of  the  operating  staff  of  eight 
men  were  definite.  Two  experienced  men  operated  the  two  oscillographs  and  auxiliary 
equipment  in  the  test  houses;  before  the  runs  were  made  it  was  their  duty  to  adjust 
and  space  the  records  on  the  films  in  such  a  manner  that  the  path  of  a  record  of  one 
instrument  would  be  expected  to  cause  little  or  no  interference  with  companion  records. 
Before  a  set  of  locomotive  runs  was  started  each  magnetic  strain  gage  on  the  rail  or 
joint  bars  was  set  in  proper  balance  by  a  third  man  who  adjusted  the  gage.  Coordina- 
tion of  adjustment  between  the  gage  and  its  proper  recording  space  on  the  film  record 
were  set  by  the  gage  man  and  an  oscillograph  operator  by  telephone  headsets  from  their 
respective  places;  these  adjustments  were  checked  several  times  during  the  day.  The 
oscillographs  were  started  in  operation  just  before  the  test  locomotive  reached  the 
instruments  on  the  track  and  turned  off  just  after  it  had  passed.  A  gear  box  driving 
the  oscillographs  made  it  possible  to  select  a  proper  length  of  film  record  to  correspond 
to  the  speed  of  the  test  locomotive.  It  was  possible  to  record  four  or  five  runs  on  a 
60-in.  film.  After  the  last  run  had  been  recorded  on  the  pair  of  films,  they  were  removed 
from  the  oscillographs  and  immediately  developed  by  a  photographer  in  the  small  dark 
room  in  the  test  house.  After  the  films  were  dry  a  draftsman  lettered  the  proper 
information  on  the  films  so  that  they  could  be  readily  identified  and  studied. 

Two  machinists  were  kept  busy  preparing  the  joint  bars  for  testing  by  drilling 
the  holes  for  the  gages,  transferring  the  gages  from  one  test  location  to  another  and  in 
the  preparation  of  material  for  many  of  the  auxiliary  tests. 

As  the  tests  were  made  up  of  almost  600  individual  test  runs  and  as  the  gages 
were  changed  from  point  to  point  42  times  during  the  tests,  usually  from  one  set  of 
joint  bars  to  another,  it  was  necessary  to  record  in  systematic  detail  all  the  operations 
that  were  made.  Printed  form  data  sheets  aided  the  recorder  in  listing  details  of  the 
test.  As  the  tests  were  conducted  on  a  very  busy  main  line  track,  an  operator 
(dispatcher)  located  at  the  test  site  made  it  possible  to  use  the  test  track  efficiently 
without  interfering  much  with  regular  traffic. 

In  the  calibration  a  proper  amount  of  resistance  was  placed  in  each  magnetic  strain 
gage  circuit  to  make  a  deflection  of  one  inch  on  the  film  equivalent  to  a  stress  of  20,000 
lb.  per  sq.  in.  For  the  six  gages  measuring  longitudinal  and  vertical  movements  between 
rail  and  joint  bars  a  deflection  of  1  in.  on  the  film  usually  corresponded  to  a  move- 
ment at  the  gage  of  0.01  in.  The  resistances  in  the  solenoid  gage  circuits  were  set  so 
that  a  deflection  of  1  in.  on  the  film  corresponded  to  a  rail  depression  of  0.25  in. 

After  the  testing  was  completed,  the  deflections  were  measured  from  the  films  in 
the  office.  Light  was  projected  through  the  film  and  a  scale  cross  section  paper  was 
placed  behind  the  film  and  the  amount  of  deflection  in  one-hundredths  of  an  inch  at 


Stresses,    Moments   and    Depressions   in    Rail ISS 

each  wheel  was  measured  and  recorded.  The  negative  values  approximately  one-half 
way  between  wheels  were  also  read.  After  the  deflections  were  thus  taken  from  the 
films,  the  values  were  multiphed  by  the  proper  constants  to  reduce  stress  to  pounds 
per  square  inch,  rail  depression  to  inches  and  movements  between  rail  and  joint  bars 
to  inches.  For  a  group  of  runs  the  tabulated  values  were  then  averaged  and  plotted 
so  that  the  data  could  be  studied  and  interpreted. 

In  almost  all  of  the  films,  even  for  the  runs  at  90  miles  per  hour,  the  deflections  on 
the  film  could  be  read  accurately  to  0.02  in.,  which  would  correspond  to  a  stress  accuracy 
of  about  400  lb.  per  sq.  in.  Naturally  the  measuring,  recording,  transferring  to  proper 
units,  averaging  and  plotting  of  the  more  than  120,000  individual  measurements  was 
time-consuming.  Measuring  the  values  from  the  films  was  found  to  be  more  rapid  and 
a  more  pleasant  task  than  measuring  a  like  number  of  readings  from  any  of  the 
mechanical  recording  gages  with  which  the  test  party  has  had  experience. 

The  extremely  large  volume  of  data  taken  in  the  field  tests  and  a  large  amount 
of  data  in  the  laboratory  test  to  correlate  with  the  field  tests  required  time  for  reduc- 
tion. The  analyses  of  the  results  and  their  interpretation,  as  checking  the  many  ways  in 
which  the  variable  factors  apply  to  findings,  occupied  the  attention  of  the  staff  for  a 
considerable  period.  In  fact,  this  part  of  the  preparation  of  the  report  was  time-consuming 
and  had  to  be  handled  with  extreme  care. 

III.  Stresses,  Moments  and  Depressions  in  Rail  with  the 
Electric  Locomotive  and  the  Cars 

9.  Stresses  and  Moments  in  Rail. — The  excellent  testing  equipment  available 
gave  opportunity  to  measure  the  stresses  and  depressions  in  rail  developed  under  speeds 
ranging  up  to  90  miles  per  hour  with  a  locomotive  that  was  free  from  some  of  the 
complications  given  by  the  ordinary  steam  locomotive.  The  absence  of  unbalanced  rotat- 
ing parts  in  the  electric  locomotive  also  gave  an  opportunity  to  learn  something  of  the 
variation  in  the  load  applied  to  the  two  rails  through  the  transfer  of  vertical  load  from 
one  of  the  wheels  of  an  axle  to  its  companion  wheel.  The  main  purpose  of  the  measure- 
ment of  stress  in  the  rail,  however,  was  to  find  the  stresses  and  moments  developed 
in  the  rail  to  serve  as  a  basis  of  comparison  for  the  discussion  of  the  stresses  and 
moments  developed  in  the  joint  bars.  The  data  obtained,  although  too  limited  to  estab- 
lish fully  some  of  the  relations  between  the  action  of  the  locomotive  and  the  rail,  will 
be  found  to  be  useful  information. 

The  magnetic  strain  gages  were  placed  at  the  middle  of  the  bate  of  rail ;  the  reading 
then  gives  the  mean  longitudinal  stress  in  the  base  of  rail.  As  the  six  gages  were  placed 
opposite  one  another  (three  on  each  rail  as  shown  in  Fig.  1)  with  a  spacing  of  ten  feet 
(the  same  as  the  spacing  of  the  driving  wheels)  simultaneous  stress  values  are  always 
obtained  for  the  two  wheels  on  one  axle,  and  besides,  at  the  instant  the  six  driving 
wheels  are  over  the  six  gages,  simultaneous  values  of  rail  stress  for  all  six  driving  wheels 
become  available  for  this  position,  as  well  as  simultaneous  values  for  first  and  second 
wheels  and  second  and  third  wheels  at  other  instants.  It  should  be  appreciated,  however, 
that  the  varying  nature  of  the  rail  supports  will  result  in  some  difference  in  the  values 
even  for  identical  wheel  loadings.  It  should  also  be  recognized  that  differences  in  the 
stiffness  of  the  support  and  the  amount  of  play  at  the  three  places  or  locations  where 
the  instruments  were  placed  will  develop  differences  in  values  besides  those  caused  by 
the  changing  "attitude"  of  the  locomotive  and  its  wheels  in  passing  from  one  test 
location  to  another.  Such  variations  are  inevitable  in  railroad  track  and  rolling  stock, 


156 


Stresses    in    Railroad    Track 


—  noO  O  O 


Q  Q 


Run  31,  Osc.  B 
3    lOOOOps. 


*     '  ^Tension 


dU-W\i2 


5  m.p.h. 


Compression 

Rail  Stress 


•\   ? 


Q  O  O  OOo  O 


I 


I 


Fig.  11. — Typical  Records  of  Rail  Stress  and  Rail  Depression  at  5  and  90  Miles 
per  Hour — Pennsylvania  Railroad  Electric  Locomotive  4779 — Elkton,  Md. 

even  though  the  magnitudes  of  the  variations  will  vary  greatly  with   the  quality  and 
condition  of  both  track  and  rolling  stock. 

Two  typical  films  of  stress  and  depression  records  are  shown  in  Fig.  11.  The  upper 
record  is  for  a  speed  of  5  miles  per  hour  and  the  lower  for  90  miles  per  hour,  the 
highest  speed  run.  These  records  are  for  right  rail  only.  They  are  numbered    1   to   6 


Stresses,    Moments    and    Depressions    in    Rail 


157 


from  bottom  to  top,  the  first,  second  and  third  representing  stresses  in  the  middle  of 
the  base  of  rail  and  the  fourth,  fifth  and  sixth  depressions  of  the  rail.  The  stress  given 
by  1  and  the  depression  by  4  are  at  the  same  gage  location  (Location  4  right  rail). 
Similarly  2  and  5  are  for  the  next  location  (Location  5  right  rail)  and  3  and  6  the  last 
location  (Location  6  right  rail).  A  zero  line  of  stress  has  been  drawn  on  the  film. 
Tensile  stress  is  indicated  above  this  line  and  compressive  stress  below  it.  The  approxi- 
mate scale  of  the  records  is  indicated  in  the  diagram.  The  film  for  90  miles  per  hour 
has  a  timing  wave  of  60  cycle  per  second  at  the  bottom  edge;  the  5  miles  per  hour 
film  has  half-second  interval  peaks.  These  two  films  were  made  by  the  six  galvano- 
meters of  one  of  the  oscillographs  and  are  for  the  right  rail.  The  other  oscillograph 
running  from  a  common  driving  shaft  was  simultaneously  making  similar  records  for 
the  left  raQ. 

The  left  end  of  the  records  is  the  head  end  of  the  locomotive,  and  the  wheels  pass 
over  the  instrument  in  the  order  represented  above  the  diagram.  The  stress  and  depres- 
sion records  are  thus  made  from  left  to  right  as  the  wheels  move  to  the  left.  For  those 


a 


oO  o  o 


O   O 


^82'-^  97"-4-  120"  --^^  120"  -^  97'^^  82"^ 
—  Left  Side    25100  25100    36100       X300     34200    22600  224O0 
•- -Right  Side    19700  ISfTOO    39500      40200     41800     '6000  16300 


-.    400 


300 
2O0 


100 


I  -200 


'0.2 
'  0.3 


^- 

■^ 

***= 

^"V 

^"''^ 

"i* 

Fig.  12. — Calculated  Moments  and  Stresses  and  Depressions  in  Rail 
for  Wheel  Scale  Weights — Electric  Locomotive  4779. 


not  familiar  with  interpretation  of  such  records,  it  may  be  said  that  the  peaks  of  the 
records  are  taken  to  be  formed  when  a  wheel  is  directly  over  the  instrument.  For  the 
peak  and  immediately  on  each  side  the  stresses  in  base  of  rail  are  tensile  stresses.  For 
the  middle  part  of  the  space  between  wheels  the  stress  is  compressive  and  the  record 
has  a  rounded  form.  For  the  spacing  of  the  driving  wheels  of  this  locomotive  the 
maximum  compressive  stress  in  base  of  rail  at  a  point  halfway  between  two  driving 
wheels  is  about  one-half  of  the  maximum  tensile  stress,  which  occurs  directly  under 
the  wheel.  It  may  be  remarked  that  the  oscillograph  records  of  stresses  in  rail  were 
remarkably  smooth  and  definite.  As  the  scale  of  the  record  was  perhaps  three  times 
"that  of  Fig.  11,  measurement  of  the  magnitude  of  the  stresses  was  a  comparatively 
easy  task. 

In   Fig.   12   are  given   the   calculated   magnitude   and   distribution   of   the   moments 
and  stresses  and  depressions  in  the  131 -lb.  rail  along  the  length  of  the  electric  locomotive 


158 


Stresses    in    Railroad    Track 


used,  as  determined  analytically  with  static  loading  using  the  wheel  weights  reported 
as  existing  two  years  before  the  tests  were  made.  The  full  line  represents  values  for 
the  left  rail;  for  the  right  rail  a  dotted  line  is  shown  for  stresses  and  moments  whenever 
it  differs  enough  from  the  full  line  to  differentiate  it  in  a  reproduction.  The  stresses  in 
base  of  rail  at  the  driving  wheels  so  calculated  are  14,700  and  11,600  lb.  per  sq.  in.  for 
the  first  driving  wheel,  13,700  and  12,700  for  the  second  driving  wheel,  and  13,500  and 
12,000  for  the  third.  The  corresponding  bending  moments  in  the  rail  are  400,000  and 
320,000,  380,000  and  350,000  and  370,000  and  330,000  in.-Ib.  for  the  several  driving 
wheels.  It  will  be  seen  that  the  stresses  recorded  in  Fig.  11  and  the  calculated  values  in 
Fig.  12  are  quite  similar  in  the  characteristics  of  their  magnitude  and  distribution, 
though  of  course  variations  may  be  expected  because  of  possible  variations  in  rail 
support  along  the  track  and  inaccurate  knowledge  of  the  wheel  loads,  as  well  as  the 
effect  of  speed  and  the  ever  present  changes  in  the  way  the  locomotive  weight  is  applied 
to  the  track. 

Table  1  gives  the  average  stresses  in  the  base  of  each  rail  at  each  gage  location  for 
each  driving  wheel  at  speeds  of  5,  60  and  90  miles  per  hour.  The  given  values  are  the 
averages  for  10  runs  at  5  miles  per  hour,  7  runs  at  60  miles  per  hour,  and  5  runs  at 
90  miles  per  hour,  making  30  stress  observations  for  each  rail  at  S  miles  per  hour,  21 
at  60  miles  per  hour,  and  IS  at  90  miles  per  hour.  The  number  of  observations  for  each 
rail  and  each  wheel  is  sufficient  to  furnish  reliable  average  values  of  stresses  and  also  to 
permit  a  study  of  the  variation  in  stress  for  the  three  gage  locations  and  the 
three  speeds. 

From  the  values  in  Table  1  it  is  found  that  for  all  driving  wheels  and  all  speeds 
the  average  stress  for  the  left  and  right  rails  at  Location  4  is  15,000  lb.  per  sq.  in.,  for 
Location  5,  13,500  lb.  per  sq.  in.,  and  for  Location  6,  13,700  lb.  per  sq.  in.  The  average 
values  at  Location  4  are  then  about  10  percent  greater  than  those  at  locations  S  and  6. 


Table  1 

Values  of  Average  Measured  Stresses  tn  the  Left  Rail  and  the  Right 
Rail  for  All  Runs  at  5,  60  and  90  Miles  per  Hour  at  Each  Driving 
Wheel  at  Each  Gage  Location. 

Electric  locomotive  4779  of  Pennsylvania  Railroad  at  Klkton,  Md. 
Values  are  given  in  thousands  of  pounds  per  square  inch. 


Speed 

Driver 

Rail  Location 

Average 

in 

Miles 

No 

4 

5 

6 

Left 

Right 

per 

Hour 

Left 

Right 

Left 

Right 

Left 

Right 

5 

1 

15.4 

15.2 

13.9 

15.5 

13.9 

16.3 

14.4 

15.3 

2 

13.8 

15.1 

12.1 

14.2 

12,3 

14.4 

12.7 

14.6 

3 

15.2 

13.2 

13.2 

12.4 

15.4 

12.4 

13.9 

12.7 

Av. 

14.8 

14.5 

13.1 

14.0 

13.2 

14.0 

13.7 

14.2 

Av.    14.6 

13.5 

13.6 

13.9 

60 

1 

16.1 

15.5 

15.3 

15.5 

15.0 

14.4 

15.5 

15.1 

2 

14.7 

14.8 

12.3 

14.7 

12.3 

14.5 

13.1 

14.7 

3 

15.1 

13.4 

14.4 

13.6 

15.0 

11.6 

14.8 

12.9 

Av. 

.15.3 

14.6 

14.0 

14.6 

14.1 

13.5 

14.5 

14.2 

Av.    14.9 

14.3 

13.8 

14.3 

90 

1 

16.9  1  15.2 

13.3 

15.9 

12.7  1  17.1 

14.3 

16.1 

2 

13.5 

17.5 

7.5 

15.9 

10.7 

15.2 

10.6 

16.2 

3 

13.2 

17.2 

9.3 

15.0 

12.8 

13.5 

11.8 

15.2 

Av. 

14.5 

16.6 

10.0 

15.6 

12.1 

15.3 

12.2 

15.8 

Av,    lb, 5 

12.8 

13.7 

14.0 

Grand 

Average    15.0 

13.5 

13.7 

14,1 

Stresses,    Moments    and    Depressions    in    Rail 


159 


The  play  between  rail  and  tie  and  tie  support  at  gage  location  5  was  found  to  be  less 
than  at  the  other  two  locations.  Differences  in  stress  at  the  three  locations  may  be 
due  not  only  to  variations  in  rail  support  but  also  to  the  general  movement  of  the 
locomotive  at  the  points  of  the  three  locations. 

The  average  of  all  the  stresses  in  the  left  rail  for  the  three  driving  wheels  and 
for  the  three  speeds  is  13,500  lb.  per  sq.  in.  and  that  in  the  right  rail  is  14,700  lb. 
per  sq.  in.  As  the  weighed  load  at  the  driving  wheels  on  the  right  side  was  about 
10  percent  greater  than  that  on  the  left  side  and  as  the  superelevation  of  IJ/2  in.  on 
the  left  rail  resulted  in  an  application  of  greater  load  by  the  three  driving  wheels  on 
the  right  rail  at  the  low  speed  amounting  to  perhaps  5  percent,  the  difference  in  stress 
in  the  two  rails  is  less  than  might  be  anticipated.  With  the  lack  of  information  on  the 
actual  wheel  loads  at  the  time  of  tests  definite  discussion  on  the  source  of  the  variation 
is  not  possible. 

Stresse:^  in  base  of  rail  with  a  modulus  «  of  2,500  lb.  per  in.  per  in.  have  been 
computed  on  the  basis  of  the  reported  scale  weights  on  the  wheels  of  the  locomotive 
and  have  been  multiplied  by  14/13ths  to  give  the  same  grand  average  as  the  stresses 
measured  at  five  miles  per  hour  and  thus  permit  a  comparison  in  the  distributions  of 
stress.  The  values  for  the  nominal  wheel  loads  have  been  computed  in  the  same  way. 

Table  2 

Measured  Stress's  and  Adjusted  Computed  Stresses  In  Base  of  Rail 
for  Reported  Scale  Weights  and  for  Nominal  Weights 

BU.ectrlc  locomotive  4779  of  Pennsylvania  Railroad  at  Elkton,  Md. 
Values  are  given  in  thousands  of  pounds  per  square  inch. 


Left  RaU 

Right  Rail 

Location 

6 

5 

4 

6 

6 

4 

Driver 

1 

2 

3 

1 

2 

3 

Measured  stress  (5  m.p.h.) 
Calculated  from  scale  weights 
Calculated  from  nominal  weights 

13.2 
14.5 
14.0 

14.2 
14.8 
14.2 

15.3 
15.8 
13.9 

15.2 
12.9 

14.0 

12.1 
13.7 
14.2 

13.9 
12.4 

13.9 

Table  3 

Values  of  Averaged  Measured  Stresses  in  the  Left  Rail  and 
the  Right  Rail  for  All  Runs  at  5,  60  and  90  Miles  per  Hour 
at  Each  Driving  'Awheel  —  Average  of  Three  Cage  Locations 

Electric  locomotive  4779  of  Pennsylvania  Railroad  at  Elkton,  Ud. 
Values  are  given  in  thousands  of  pounds  per  equare  Inch. 


Driver  Number 

Average 

Average 

Speed 

Left 

Right 

Left  and  Right 

of 
Three 

1 

2 

3 

1 

2 

3 

1 

2 

3 

Drivers 

6 
60 

Av. 

14.4 

lb   5 
1-^.1 

13.3 

ie.7 
i-''.l 

1 '.  ■ .  0 
12.1 

13.9 

14.6 
ll  .n 

13.5 

15.3 
15.1 

Ic.  1 

15.5 

14.6 

14.7 

i  e .  - 

15.4 

13.0 

1  ..■- 
13.-' 

14.9 
15. .3 
14.  r'. 

14.9 

13.7 
13.9 
U.4 

13.7 

12.7 
13.9 

1.-..4 

13. e 

14.4 
14.0 

160 


Stresses    in    Railroad    Track 


20 
18 

''  16 

j- 
i» 

14 

^ 

12 
10 

8 
18 
16 
14 
12 
10 

8 
18 
16 
14 
12 
10 

8 


5  m.p.h. 


Left  Rail      Right  Roil 

'SJ-       «0       U)       ^       If)       ^ 


60  m.p.u. 


Left  Rail        Right  Rail 
^      vo     <*      ^      lO     <x» 


•  90  m.p.h. « 

Left  Rail         Right  Rail 
^      »o      u>     ^     >r)     ^o 


«fi»    ••    Mf 


oo 


•Mvm 


ooo 


First  Driver 


c8d 


>^ 


^ 


V) 


9t^x> 


^^t^ 


^ 


O  Second  Driver 


O 
txr 


g:^ 


d* 
^ 


tW 


-CO- 


^«r 


M^ 


9P 


r/)/r<y  Or/Ver        • 


9> 


Fig.  13. — Individual  Values  of  Measured  Stresses  in  Left  and  Right  Rail  for  Each  Run 

and  Each  Driver  of  Electric  Locomotive  4779  at  Gage  Locations  4,  5  and  6 

at  5,  60  and  90  Miles  per  Hour. 


The  results  are  given  in  Table  2.  A  comparison  with  the  corresponding  averages  for  the 
measured  stresses  for  each  pair  of  driving  wheels  at  five  miles  per  hour  shows  that  the 
average  of  the  measured  stresses  is  somewhat  greater  than  the  calculated  ones  at  the 
first  and  third  pairs  of  driving  wheels  and  somewhat  less  at  the  second  pair  of  wheels. 
A  comparison  of  the  average  of  the  stresses  for  the  left  and  right  wheels  on  the  same 
axle  (Table  3)  shows  that  the  variations  for  the  speeds  of  S,  60  and  90  miles  per  hour 
are  slight,  the  three  speeds  differing  for  each  axle  not  more  than  700  lb.  per  sq.  in. 
from  the  average  for  the  given  axle.  The  uniformity  is  in  the  average  of  the  stresses 
for  two  companion  wheels;  marked  variations  for  the  individual  wheels  of  an  axle  are 
apparent,  as  is  brought  out  more  fully  farther  on. 


Stresses,    Moments    and    Depressions    in    Rail 161 

In  Fig.  13  are  plotted  individual  points  representing  the  stress  in  base  of  rail  for 
each  run  for  each  driving  wheel  at  each  gage  location  for  each  of  three  speeds.  The 
diagram  gives  a  general  idea  of  the  distribution  and  spread  of  the  individual  values. 
It  will  be  noted  that  each  group  of  points  has  a  similar  variation;  except  for  a  few 
scattered  points  the  values  in  a  group  in  general  come  within  a  range  of  2,000  lb.  per 
sq.  in.  or  less.  Each  group  however  occupies  an  individual  position.  The  points  for  each 
gage  location  have  a  position  and  value  that  depend  upon  the  driving  wheel  and  the 
speed  producing  the  recorded  value.  The  six  driving  wheels  show  dissimilarity  in  the 
position  of  the  plotted  points.  Notwithstanding  the  uniformity  in  the  values  of  the 
averages  and  grand  averages  of  the  stresses  at  a  given  driving  wheel,  there  are  variations 
of  some  magnitude  in  the  individual  values  at  the  six  gage  locations.  Especially  at  the 
speed  of  90  miles  per  hour  are  the  wider  variations  noticeable  at  the  different  wheels 
and  for  the  different  locations. 

At  90  miles  per  hour  one  of  the  largest  ranges  in  stress  for  the  three  gage  locations 
is  found  under  the  second  driving  wheel,  which  has  a  total  range  of  about  3,000  lb. 
per  sq.  in.  above  and  below  the  average.  At  90  miles  per  hour  it  is  apparent  from  the 
values  shown  in  the  figure  that  some  action  is  taking  place  that  makes  substantial 
changes  in  the  forces  applied  to  the  track  during  the  time  the  locomotive  travels  the 
distance  of  10  ft.  from  Location  4  to  Location  5,  and  a  further  10  ft.  to  Location  6. 
With  the  locomotive  traveling  at  90  miles  per  hour  only  about  1/7  sec.  is  required  to 
cover  the  total  distance  of  20  ft.  As  an  example,  at  90  miles  per  hour,  for  the  second 
driving  wheel  on  the  left  rail  the  stresses  average  13,500  lb.  per  sq.  in.  at  Location  4. 
When  the  wheel  gets  to  Location  5  the  stresses  are  only  7,500  lb.  per  sq.  in.  but  rise 
to  10,700  lb.  per  sq.  in.  with  the  wheel  at  Location  6.  At  the  same  time  for  the  second 
driving  wheel  on  the  other  rail  (right  rail)  the  stresses  shown  average  about  17,500, 
15,900  and  15,200  lb.  per  sq.  in.  for  locations  4,  5  and  6  successively,  all  values  bein'4 
high  with  respect  to  the  other  rail.  These  stresses  indicate  not  only  a  rapid  variation  at  a 
given  wheel  but  also  some  transfer  of  load  from  one  side  to  the  other. 

The  rapidity  with  which  these  changes  take  place  would  indicate  that  it  is  doubtful 
that  the  changes  can  be  caused  by  movements  of  the  locomotive  as  a  whole.  Any  forces 
from  movements  involving  such  heavy  masses  as  the  whole  locomotive  could  hardly 
be  expected  to  change  so  quickly.  A  possible  source  of  these  variations  is  in  the  action 
of  the  running  gear  itself. 

Three  individual  runs  were  selected  that  represent  the  general  range  of  all  the 
individual  values  shown  in  Fig.  13;  these  are  plotted  in  Fig.  14.  The  sequence  of  values 
of  stress  for  a  given  run  may  there  be  followed  as  the  locomotive  passes  each  of  the 
three  locations.  Values  for  a  given  run  and  driving  wheel  have  been  connected 
by  lines. 

It  is  definitely  shown  by  the  figure  that  on  a  given  run  there  are  in  some  cases 
marked  changes  in  the  stress  or  moment  developed  by  a  driving  wheel  within  the 
distance  of  ten  feet  between  instrument  locations.  The  greatest  changes  from  place  to 
place  are  found  for  runs  at  90  miles  per  hour;  it  can  be  seen  that  on  a  given  run  the 
driver  that  gives  the  highest  stress  of  the  group  at  one  gage  location  may  give  the 
lowest  stress  at  the  next  location.  Some  variation  in  the  trends  of  the  several  runs  is 
seen  but  in  general  the  stress  changes  in  the  same  manner  for  a  given  driver  at  a 
given  speed.  This  similarity  indicates  the  probabiHty  that  the  changes  from  place  to 
place  are  governed  mostly  by  the  action  of  some  parts  of  the  locomotive,  which  in 
turn  is  influenced  by  the  variations  of  the  track  as  the  instrument  locations  are 
approached.  The  locomotive  apparently  has  the  same  action  for  each  run  at  a  given 
location  and  speed,  but  this  action  varies  widely  at  the  several  locations. 


162 


Stresses    in    Railroad   Track 


20 
18 

16 

\lO 

^  a 

o 

o 

iS  14 
.c 

C  12 


CQ 


18 


5  m.p.h. 


Left  Rail       Right  Rail 

^       lO       <45       ^       T)       <x» 


60  m,p.h. 


Left  Rail        Right  Rail 
^      ID      U)      ';^      U-)      ^i) 


■ 90  m.p.h. 1 

Left  Rail         Right  Rail     \ 

^        lO        <^        '^        lO        U5    I 


^16 

CO  14 

12 

10 


Fig.  14. — Stresses  in  Rail  in  Sequence  at  Gage  Locations  4,  S  and  6  for  Each  Driver  on 
Given  Runs — Electric  Locomotive  4779. 


The  test  setup  permitted  a  measurement  of  the  stresses  and  depressions  developed 
simultaneously  by  each  of  the  six  driving  wheels  at  the  six  gages.  The  spacing  and 
number  of  the  instruments  for  measuring  stresses  and  depressions  corresponded  with 
the  spacing  and  number  of  the  driving  wheels.  Thus,  at  one  certain  instant  as  the 
locomotive  passed  over  the  test  setup  all  the  driving  wheels  were  recording  simultaneous 
values  with  the  wheels  directly  over  the  gages.  The  stresses  and  depressions  then  represent 
the  effects  at  this  one  instant  of  all  vertical  loads  or  forces  from  the  driving  wheels. 
Fig.  15  gives  these  simultaneous  values  of  moment  obtained  from  the  measured  stresses 
for  three  runs  that  represent  the  range  of  values  for  each  speed.  Of  course,  the  differ- 
ences in  support  at  the  several  locations  and  the  inequalities  in  the  loads  on  the  wheels 
caused  variations  in  the  moments  developed,  but  it  is  apparent  that  in  at  least  one 
case  there  is  some  action  that  causes  a  greater  variation  than  the  differences  referred  to 


Stresses,    Moments    and    Depressions    in    Rail 


16.5 


[- 5  m.p.h.  ■ 

Driver    no.  3      2      I      3       2      I 
Left   Rail       Right  Rail 

^       lO       to       '!I-       10       vo 


«  600 

M.  500 
o 

-g  400 

I  300 


200 

100 


— ■    60  m.p.h.  — 
2      13      2 


3 

Left  Rail  Right  Rail 

'^     lo     <£)     <g-     IT)     to 


90  m.p.h. • 

3  2  13  2  1 
Left  Rail  Right  Rail 
^      lo     to      'vj-     lo      to 


5     a 


3     -3 


Fig.  IS. — Simultaneous  Moments  in  Rail  at  Each  Driver  at  5,  60  and  90  Miles  per 
Hour — Electric  Locomotive  4779. 


produce.  Between  S  and  60  miles  per  hour  there  are  only  minor  changes  in  the  magni- 
tude of  the  moments  for  any  wheel  at  a  given  gage  location.  At  90  miles  per  hour, 
however,  the  moment  in  the  left  rail  under  the  second  driving  wheel  is  markedly  lower 
at  gage  Location  5  than  elsewhere.  The  moment  values  at  the  other  locations  (4  and  6) 
over  which  the  third  and  first  driving  wheels  are  passing  at  the  instant  are  also  lower 
at  90  miles  per  hour  than  at  S  and  60  miles  per  hour,  but  they  have  not  decreased  so 
greatly  as  at  Location  5.  All  moment  values  on  the  right  rail  have  risen  at  90  miles 
per  hour  but  it  is  seen  that  the  increases  have  been  approximately  equal  at  the  three 
locations. 

From  Fig.  13  and  Fig.  14,  showing  individual  stresses  and  sequence  of  values  for 
selected  runs  on  each  driver,  it  is  seen  that  the  same  decrease  in  moment  (or  in  stress"* 
was  shown  by  each  driving  wheel  at  90  miles  per  hour  in  passing  Location  5  t^.'i  the 
left  rail.  The  moments  in  the  right  rail  at  90  miles  per  hour  were  in  general  higher 
than  those  for  the  runs  at  the  lower  speeds,  though  generally  there  were  not  the  marked 
variations  between  gage  locations  found  in  the  left  rail.  The  fact  that  the  several 
drivers  on  the  left  rail  exhibit  the  same  or  similar  characteristics  on  passing  Location  5 
would  indicate  that  there  is  probably  some  peculiarity  of  support  or  alinement  that 
influences  the  behavior  of  the  locomotive  action  at  that  point.  It  is  possible  the  pecul- 
iarity is  not  at  Location  5,  but  some  action  may  be  initiated  before  reaching  Location  5 
and  attain  a  somewhat  increased  state  of  development  at  that  location. 

The  three  locations  had  varying  amounts  of  play  between  the  rail  and  its  support. 
Location  5  had  the  least  play,  the  amount  being  about  half  that  found  at  the  other  two 
locations.  Location  S  in  general  showed  lesser  magnitudes  of  stresses  and  moments. 

In  Fig.  16  are  plotted  the  moments  in  the  left  and  right  rail  at  each  driving  wheel 
for  various  speeds  and  all  gage  locations.  The  values  given  are  averages  of  all  runs. 
The  diagram  shows  that  at  a  speed  of  five  miles  per  hour  the  moments  in  the  two  rails 
for  a  given  driving  wheel  and  location  are  similar  or  not  greatly  different.  For  the  first 
and  second  driving  wheels  the  moment  for  the  right  side  is  somewhat  the  greater,  as 
is  to  be  expected  from  the  weighed  loads  previously  given,  but  the  third  driving  wheel 
on  the  left  side  gives  the  larger  moment  contrary  to  the  relation  expected.  The  moments 


164 


Stresses    in    Railroad    Track 


500 


400  ^ 


Location    4 


Location    5 
\rRight   Rail\^-^^ 


Location     6 


0      20     40     60     80   100  0      20     40     60     80   100  0     20     40     60     80    100 
Speed    in    Miles    per    Hour 

Fig.  16. — Moments  in  Left  and  Right  Rail  at  Each  Driver  for  Various 
Speeds — Electric  Locomotive  4779. 

in  the  rails  at  the  higher  speeds  are  seen  to  maintain  their  similarity  to  those  at  S 
miles  per  hour  in  most  cases,  with  only  small  changes  up  to  a  speed  of  60  miles  per 
hour.  Above  60  miles  per  hour  greater  changes  take  place  in  the  moments;  some  of 
the  largest  differences  between  the  two  rails  occur  at  90  miles  per  hour.  As  an  example 
the  second  driving  wheel  at  Location  5  for  90  miles  per  hour  developed  205,000  in.-lb. 
in  the  left  rail  and  435,000  in.-lb.  in  the  right  rail.  The  moments  shown  at  90  miles 
per  hour  are  the  average  of  five  runs  and  most  of  the  values  for  individual  runs  have 
as  small  variation  as  could  be  reasonably  expected.  It  should  be  stated  that  for  runs 
other  than  at  5,  60  and  90  miles  per  hour  the  values  shown  include  only  one  or  two 
runs  at  each  given  speed.  However,  the  agreement  with  the  general  trend  of  the  values 
for  5,  60  and  90  miles  per  hour  was  reasonable  enough  to  include  them  with  the 
averages. 

It  may  be  noted  in  Fig.  16  that  changes  of  moment  in  one  rail  are  generally 
matched  by  approximately  equal  and  opposite  changes  in  the  other  rail  so  that,  what- 
ever the  action,  a  transfer  of  load  from  one  rail  to  the  other  occurs.  If  the  values  for 
the  two  rails  are  averaged  the  points  he  close  to  a  horizontal  line.  The  changes  in 
either  side  are  evidently  a  result  of  the  transfer  of  load  from  one  rail  to  the  other, 
with  a  negligible  speed  or  impact  effect  even  at  90  miles  per  hour.  The  excellent  condi- 
tion of  the  track  and  the  use  of  an  electric  locomotive  probably  were  important  factors 
in  this  lack  of  speed  effect. 

It  may  be  well  at  this  point  to  review  in  part  the  mechanics  involved  in  the  transfer 
of  vertical  load  from  one  rail  to  the  other.*  The  purpose  of  an  analysis  is  to  show  the 
possibility  of  what  in  effect  may  be  considered  a  transfer  of  load  from  one  wheel  to  the 
other  on  the  same  axle  when  lateral  forces  are  applied  to  the  wheels  or  the  axle.  The 
lateral  forces  may  be  applied  by  the  locomotive  or  car,  or  the  corresponding  lateral 


A  discussion  of  the  possible  transfers  of  load  from  one  side  to  the  other  on  curved  track  was 
given  by  Dr.  S.  Timoshenko  in  Volume  26,  192S,  Proceedings  of  American  Railway  Engineering 
Association  in  connection  with  the  Fourth  Progress  Report  of  the  committee. 


Stress  e  s  ,    Moments    a  n  fl    Depressions    in    Rail 


165 


H\H' 


H' 


t 


W 


2W\ 


Fig.  17. — Vertical  and  Lateral  Forces 

Applied  to  a  Pair  of  Locomotive 

Wheels  or  Car  Wheels. 


reaction  forces  may  be  applied  by  the  rails  through  such  a  source  as  poor  alinement. 
In  Fig.  17  vertical  and  lateral  forces  and  reaction  forces  are  shown  as  acting  on  a  pair 
of  locomotive  wheels  or  car  wheels,  b  is  the  assumed  horizontal  distance  between  centers 
of  bearing  of  the  wheels  on  the  rails.  The  total  vertical  load  transmitted  to  the  axle  is 
given  as  2W,  and  the  actual  individual  vertical  loads  applied  at  the  two  rails  are  given 
as  W'  and  W".  H'  +  H"  is  the  sum  of  the  lateral  (horizontal)  forces  applied  to  the 
axle  and  wheels  by  the  bearings  of  the  locomotive  or  car,  considered  to  be  applied  at 
the  level  of  the  axle.  The  position  of  the  points  of  application  of  H'  +  H"  is  uncertain 
but  for  purposes  of  the  demonstration  the  distance  above  the  rail  may  be  taken  as 
equal  to  r,  the  radius  of  the  wheel.  At  the  top  of  the  rail  are  corresponding  lateral 
reaction  forces  {H'  and  H")  transmitted  from  rail  to  wheel  through  friction,  or  for  one 
wheel  possibly  partly  by  a  wheel  flange. 

Taking  moments  about  the  right  rail  bearing,  for  equihbrium, 
Wb-W'b-{H'  +  H"}r  =  0 
whence 

W'  =  W~{H'-\-H")-~- .(68) 

Similarly,  taking  moments  about  the  left  rail  bearing, 

W"  =  W+  (H'  +  H")    -y- (69) 

It  is  apparent  from  these  two  equations  that  the  application  of  a  lateral  force 
to  the  axle  or  pair  of  wheels  may  change  the  relative  pressures  on  the  two  rails  from 
equal  magnitudes  to  unequal  amounts.  Regardless  of  the  relative  values  of  the  lateral 
forces  H'  and  H",  the  vertical  reaction  forces  acting  on  the  rail  {W  and  W")  will 
depend  on  the  magnitude  of  the  lateral  force  H'  +  H"  applied  at  the  level  of  the  axle, 
and  an  increase  in  the  vertical  pressure  on  one  rail  beyond  one-half  of  the  vertical 
load  2W  will  be  accompanied  by  a  corresponding  decrease  in  the  pressure  on  the 
other  rail. 

As  an  example  assume  the  following  conditions:  2H^=:  80,000  lb.,  H' +  H"  = 
20,000  lb.,  r=36  in.,  and  6  =  58.5  in.  For  these  assumptions,  W"=  27,700  lb.  and 
W^"=  52,300  lb.  With  no  laterally  applied  load  the  vertical  reaction  forces  W  and  W" 
would,  of  course,  have  equal  magnitudes  and  each  would  be  equal  to  one-half  of  the 


166 Stresses    in    Railroad   Track 

applied  load  2W,  or  40,000  lb.  each.  It  is  seen  then  that  the  lateral  force  of  20,000  lb. 
applied  at  the  axle  will  decrease  the  vertical  left  rail  reaction  (W)  approximately  31 
percent  and  increase  the  right  rail  reaction  {W")  by  the  same  amount.  The  transfer 
of  load  between  rails  for  these  assumed  conditions  has  about  the  same  proportions  as 
the  measured  moments  in  the  two  rails  under  the  second  driving  wheel  at  Location  5 
for  the  speed  of  90  miles  per  hour,  as  given  in  the  preceding  discussion  of  Fig.  16. 
The  moment  developed  in  the  left  rail  was  205,000  in.-lb.  and  the  simultaneous  moment 
developed  in  the  right  rail  was  435,000  in-lb.,  indicating  a  change  of  about  36  percent 
from  an  equal  division  of  load  on  the  left  and  right  rail. 

The  magnitude  of  possible  transfer  of  load  or  pressure  on  rail  from  one  wheel  to 
the  other  on  the  same  axle  may  be  judged  from  consideration  of  possible  limiting  values 
of  the  frictional  and  other  forces  that  may  be  developed  between  wheel  and  rail.  For 
certain  conditions  it  may  be  assumed  that  the  lateral  force  is  transmitted  laterally  at 
the  top  of  the  rail  wholly  by  friction  between  wheel  and  rail  and  that  the  coefficient 
of  friction  developed  is  the  same  at  the  left  wheel  and  rail  as  at  the  right  wheel  and 
rail.  Call  /  the  value  of  the  coefficient  of  friction  developed  laterally  between  wheel 
and  rail  at  any  instant.  Then 

2fW  —  H'  +  H" 
Substituting  this  expression  in  equations   (68)   and   (69), 

W'^W{\-j~) (70) 

W"  =  PF(1  +  /  y-  ) (71) 

AI.o,  H'=:jW'  =  W(j—^) (72) 

H"  =  fW"  =  WU-h-f) (73) 

The  foregoing  equations  take  into  account  only  the  lateral  frictional  forces  develop- 
able between  wheel  and  rail.  Worn  treads  and  also  contour  and  flange  contacts  against 
the  rail  may  add  to  the  developable  lateral  forces.  Still  other  conditions  may  increase 
the  magnitudes.  How  large  a  lateral  force  may  be  brought  into  action  under  conditions 
of  traffic  is  of  course  not  known,  but  the  presence  of  lateral  forces  apphed  at  the  rail 
provides  an  explanation  of  the  large  variation  in  the  stresses  and  bending  moments 
developed  in  the  two  rails  in  the  runs  above  60  miles  per  hour. 

From  the  data  presented  and  the  preceding  discussions  it  is  apparent  that  the 
electric  locomotive  develops  some  action  at  the  higher  speeds  that  causes  substantial 
transfers  of  load  between  wheels  on  the  same  axle.  Since  the  stresses  were  taken  only 
at  the  middle  of  the  base  of  the  rail  definite  information  on  the  presence  or  amount  of 
any  lateral  moments  developed  in  the  rail  is  lacking.  The  locomotives  of  this  class 
have  been  found  in  other  tests  to  develop  substantial  lateral  forces  at  the  higher  speeds. 
Changes  of  considerable  magnitude  in  lateral  forces  applied  to  the  track  were  found 
to  occur  in  distances  as  small  as  20  ft.  It  seems  unlikely  that  such  rapid  changes  in 
force  can  be  the  result  of  movements  of  the  locomotive  as  a  whole  because  of  the 
large  mass  involved.  The  wheels  and  other  unsprung  parts  would  seem  a  more  probable 
source  of  lateral  forces  capable  of  developing  the  rapid  transfers  of  load  evident  in 
these  tests. 

It  should  be  stated  that  the  magnitude  of  the  mean  stresses  measured  in  the  rails 
was   moderate.  The   small   variation    of    the    individual    stresses    of   any    run    from    the 


Stresses,    Moments    and    Depressions    in    Rail 


167 


average  value  for  a  given  wheel  and  location  indicated  that  the  locomotive  is  con- 
sistent in  its  variable  action  when  all  conditions  are  similar.  It  is  quite  possible  that 
this  action,  whatever  its  nature,  is  started  by  some  definite  irregularity  of  the  track 
not  necessarily  at  the  gage  locations  and  occurs  with  a  frequency  mainly  dependent  on 
the  characteristics  of  the  locomotive  parts  affected  so  that  as  the  test  speed  is  varied 
the  locomotive  arrives  at  a  gage  location  in  different  parts  of  its  cycle  of  variation. 

The  data  are  of  interest  and  value  in  giving  information  on  the  variability  in  rail 
stress  and  load  with  this  electric  locomotive,  but  must  be  regarded  as  insufficient  for  a 
complete  understanding  of  the  action  of  the  locomotive.  The  variability  shown  by  the 
several  drivers  at  the  three  gage  locations  brings  out  one  of  the  difficulties  in  using  the 
data  as  a  basis  of  compar-ison  for  the  rail  joint  tests.  The  large  range  of  stresses  a'ong 


400 


Location    4 


Location   5 


Location    6 


Right  Rail 

^y, 

■-Left 

Rail 

ocK 

First   Wt)eei 

H^^ 

1      V 
Second    Wlieel 

•  rr^ 

r^^ 

\ 

8^ 

k-V 

Third   Wl 

wet 

oSH 

H^. 

V 
Fourth    Wheel 

,/^ 

1 
Left  Roil 

A 

Wc 

Right  Rail 

First   Wheel 

cO-^^o-^j>o-^ 

1         1 
Second   Wheel 

*x 

u 

U 

'<W-! 

■^^ 

' 

Thi 

'd  Wheel 

^ 
••-( 

1 

Fourth   Wheel 

0      20     40    60     80    100  0     20     40    60     80    DO  0     20     40     60     80  100 
Speed    in   Miles   per    Hour 

Fig.  18. — Moments  in  Left  and  Right  Rail  at  the  Wheels  of  the  Heavy  Car 
for  Various  Speeds. 

the  track  given  at  the  higher  speeds  by  this  electric  locomotive  with  no  unbalanced 
rotating  or  reciprocating  parts  suggests  a  reason  for  the  apparently  erratic  distribution 
of  stresses  with  respect  to  the  counterweight  position  that  has  been  found  with  steam 
locomotives  at  comparable  speeds.  The  presence  of  lateral  forces  of  similar  magnitudes 
with  the  steam  locomotives  would  cause  changes  in  vertical  loads  comparable  to  the 
effects  of  counterbalance. 

For  the  tests  up  to  and  including  60  miles  per  hour  two  cars  were  attached  to  the 
locomotive,  one  with  an  average  load  of  26,500  lb.  per  wheel  and  the  other  with  an 
average  load  of  6,000  lb.  per  wheel.  The  moments  developed  in  the  two  rails  at  the 
three  locations  with  the  heavier  loading  are  shown  in  Fig.  18.  As  would  be  expected 
the  moments  are  seen  to  be  somewhat  less  than   those  developed  by  the  locomotive. 


168 Stresses    in    Railroad    Track 

There  are  no  consistent  or  general  increases  in  moment  with  increased  speed  and  some 
wheels  develop  lower  moments  at  some  locations  at  60  miles  per  hour  than  at  the 
lower  speeds.  This  fact  would  indicate  that  the  car,  like  the  locomotive,  has  some 
swaying  or  oscillation  that  results  in  changes  in  the  load  distribution  among  the 
wheels,  though  not  to  such  an  extent  as  was  found  with  the  electric  locomotive  at 
speeds  higher  than  60  miles  per  hour. 

The  heavy  car  at  Location  4  developed  moments  of  about  400,000  in.-lb.  in 
several  instances  and  moments  of  300,000  in-lb.  were  found  frequently  at  the  three 
gage  locations.  The  variations  in  moment  as  between  the  two  wheels  of  an  axle  at 
the  various  speeds  are  not  as  great  as  found  with  the  locomotive.  In  some  cases 
simultaneous  increases  or  decreases  in  moment  for  both  the  left  and  right  rails  occurred, 
indicating  the  load  was  not  transferred  between  wheels  of  the  same  axle.  It  should  be 
noted  that  the  maximum  speed  of  the  car  was  60  miles  per  hour  rather  than  90  miles 
per  hour.  A  moment  of  400,000  in.-lb.  was  used  in  the  fifth  and  sixth  progress  reports 
of  the  committee  as  a  design  moment  for  joint  bars  and  has  also  been  used  in  the 
laboratory  tests  including  the  rolling  load  tests  of  rail  joints  now  being  conducted. 
It  is  of  interest  to  find  that  such  magnitudes  of  moment  are  at  times  actually  developed 
in  the  rail  at  these  speeds  by  a  freight  car  and  that  the  joints  are  called  upon  to  carry 
stresses  of  the  same  order  of  magnitudes  as  those  used  for  design  purposes. 

The  values  for  the  light  car  are  not  shown  here  but  it  may  be  stated  that  practi- 
cally all  moments  under  the  light  car  were  less  than  150,000  in.-lb.  and  most  of  them 
were  100,000  in.-lb.  or  less.  The  records  for  the  light  car  were  quite  ragged  in  form, 
indicating  vibrations  in  the  rail  from  some  source.  Although  the  amount  of  stresses 
produced  in  the  rail  by  these  vibrations  was  small,  the  effect  of  the  vibrations  on 
rolling  stock  or  lading  may  be  important.  A  possible  source  of  this  vibration  is  from 
rough  wheels.  However,  records  taken  under  traffic  indicate  similar  effects  from  other 
light  cars  and  it  may  be  that  the  lesser  mass  of  the  car  body  when  not  loaded  allows 
vibrations  in  the  car  parts  to  develop. 

It  may  be  noted  that  the  first  wheel  of  the  heavy  car  developed  lower  moments 
at  all  locations.  This  low  moment  is  probably  due  to  a  greater  negative  effect  at  the 
first  wheel  from  the  locomotive  truck  and  adjacent  car  wheel  than  at  any  of  the 
other  wheels.  None  of  the  other  wheels  had  a  relatively  heavy  wheel  load  on  both  sides. 

10.  Depression  of  Track. — Immediately  adjacent  to  the  points  where  the  mag- 
netic strain  gages  were  attached  for  measuring  rail  stresses  six  solenoid  depression  gages 
were  placed  to  record  the  depression  of  the  rail  with  respect  to  a  support  fixed  in  the 
roadbed.  These  instruments  were  described  in  Article  7  and  views  of  them  are  shown 
in  Fig.  8.  Typical  records  of  stresses  and  depressions  taken  at  S  and  90  miles  per  hour 
were  shown  in  Fig.  11.  These  records  are  for  the  right  rail.  Values  for  the  other  rail 
were  simultaneously  recorded  by  the  second  oscillograph. 

The  rail  depression  records  for  five  miles  per  hour  shown  in  Fig.  11  may  be  com- 
pared as  to  general  form  and  magnitude  with  the  depressions  shown  in  Fig.  12,  which 
were  calculated  from  the  weighed  wheel  loads.  At  a  speed  of  90  miles  per  hour  the 
load  distribution  among  the  several  wheels  was  found  to  vary  considerably.  The  long 
driver  spacing  (ten  feet)  permits  the  rail  depression  at  points  between  wheels  to  vary 
to  a  greater  extent  than  has  been  found  with  the  usual  wheel  spacing.  The  general 
shape  of  the  record  along  the  length  of  the  locomotive  is  markedly  similar  to  the 
calculated  curves  and  the  magnitudes  of  the  depressions  at  and  between  drivers  are 
similar. 


Depression    of    Track 


160 


0.10 

0.15 

u,  0.20 

^  0.10 

"~  0.15 

c 

.o 

^  0.20 

Q. 

Q  0.10 


P  0./5 


Location     4 


Location     5 


^feM4^ 


0.25 


,Left  Rail 


Right  Rail 


First    Driver 


Second    Driver 


0.20  CO^f^^o^-cj)— 
Third    Driver 


*•-!. 


Location 

6 

1      1 

J  Left  Rail 

j><S-O.J).ff/g/7r  Rail 

First    Driver     \         * 

r 
•-• 

cPt^ 

k 

\  - 

P 

Second    Dr/Ver  ]   O^ 

^ 

f^ 

&fc 

r-^ 

)-•-!  ^ 

Third    Dr 

^'e/' 

L 

^ 

0      20     40    60    80    100  0    20     40    60     80    100  0    20     40    60     80    100 
Speed  in    Miles    per   Hour 

Fig.  19. — Gross  Depression  of  Left  and  Right  Rail  at  the  Drivers  of  Electric 
Locomotive  4779  at  Various  Speeds. 

The  depression  of  the  rear  wheels  of  the  truck  are  greater  than  those  of  the  front 
wheels,  both  on  the  records  and  on  the  calculated  curves. 

The  depression  of  the  right  and  the  left  rail  for  each  of  the  three  driving  wheels 
at  the  three  gage  locations  is  plotted  in  Fig.  19  with  respect  to  speed.  The  values 
plotted  are  the  average  of  3  to  10  runs  for  the  speeds  of  5,  60  and  90  miles  per  hour 
and  1  or  2  runs  for  the  other  speeds.  The  depressions  for  5  to  60  miles  per  hour  are 
about  0.20  in.  on  locations  4  and  6  and  O.lS  in.  on  Location  S.  There  is  little  difference 
between  the  two  rails  at  locations  4  and  S ;  at  Location  6  the  right  rail  depresses  about 
0.04  in.  more  than  the  left  rail.  These  depressions  of  course  are  gross  depressions.  The 
play  between  rail  and  ballast  varied  somewhat  at  the  several  locations,  Location  5 
having  the  least.  As  far  as  could  be  judged  from  the  measurements,  the  play  between 
the  rail  and  its  support  was  similar  for  the  two  rails  at  a  given  location.  The  play  was 
about  0.14  in.  for  Location  4,  O.OS  in.  for  Location  5  and  0.14  in.  for  Location  6. 

The  depressions  are  seen  to  vary  little  with  speed  up  to  about  60  miles  per  hour. 
.\bove  60  miles  per  hour  the  depressions  for  the  two  rails  differ  appreciably  from  each 
other  in  most  instances.  At  these  higher  speeds  an  increase  of  depression  of  one  rai! 
relative  to  its  depression  at  the  lower  speed  generally  is  matched  by  an  approximately 
equal  decrease  of  depression  of  the  other  rail.  Examples  of  this  sort  of  change  are 
seen  in  the  case  of  the  first  driving  wheel  on  locations  4  and  .'5  and  the  third  driving 
wheel  also  on  locations  4  and  S.  In  some  instances  the  relative  positions  of  the  plotted 
points  for  right  and  left  rails  shift  with  respect  to  each  other  (  ne  or  more  times  in  the 
range  of  speed  from  5  to  90  miles  per  hour. 

The  relative  values  of  the  depres.-ion  in  tlic  two  rails  and  the  manner  in  which 
they  change  for  the  several  speeds  indicate  that  part  of  the  wheel  load  may  be  trans- 
ferred from  one  driver  to  another,  generally  to  the  wheel  on  the  same  axle,  decreasing 
one  driver  load  and  increasing  the  other  load.  Further,  there  is  no  increase  in  the 
average  depression  for  all  the  wheels  as  the  speed  incrca-^es — that  is  for  the  locomotive 


170 Stresses    in    Railroad    Track 

as  a  whole.  This  indicates  a  general  lack  of  speed  effect,  or  of  impact  effect,  or  increase 
of  applied  wheel  pressures  due  to  inertia  forces.  It  would  seem  too,  that  the  locomotive 
acts  at  a  given  location  in  a  way  that  is  governed  by  the  speed  at  which  the  gage 
location  is  approached  and  acts  similarly  for  each  run  at  a  given  speed,  since  the 
individual  runs  showed  good  agreement  with  each  other.  The  vertical  bending  moments 
shown  in  Fig.  16  also  indicate  the  same  similarity  in  action.  Comparison  of  this  figure 
for  the  bending  moments  with  Fig.  19  for  the  depressions  shows  that  an  increase  of 
moment  is  accompanied  by  an  increase  of  depression. 

So  far  as  known,  measurements  have  not  been  made  previously  that  recorded 
rail  depression  at  high  speeds.  It  has  been  a  question  whether  the  rail  and  ties  and 
ballast  depress  at  high  speeds  in  just  the  way  they  do  at  low  speeds  and  static  loading. 
Does  the  track  behave  elastically  at  high  speeds  and  return  immediately  to  an  unloaded 
position?  Possibly  the  action  of  the  track  at  high  speeds  may  be  affected  by  the  mass  of 
its  parts,  frictional  resistance,  and  relative  movement  of  ballast  particles.  If  the  ballast 
does  not  return  to  the  unloaded  position  as  quickly  as  it  is  depressed,  a  lesser  slope 
would  be  found  in  the  depression  records  behind  the  locomotive  wheels  than  ahead  of 
them,  if  the  loads  and  other  factors  do  not  differ.  Another  way  of  stating  this  is  that  if 
the  rate  of  doing  work  in  depressing  the  ballast  were  greater  than  the  rate  of  recovery 
of  the  energy  accumulated  during  the  depression,  the  net  result  would  be  a  loss  of 
CTiergy  so  far  as  the  locomotive  and  cars  are  concerned  and  this  loss  would  increase 
the  power  required  for  traction. 

Careful  examination  of  the  depression  records  for  the  locomotive  gave  some  evi- 
dence that  there  was  a  delay  in  the  return  of  the  track  to  an  unloaded  position.  How- 
ever, the  delay  was  about  the  same  for  lower  speeds  as  for  the  higher  speeds,  which 
gives  reason  to  believe  that  the  play  in  the  track  may  have  been  a  principal  factor. 
Difficulty  in  judging  this  action  was  also  caused  by  the  transfers  of  load  and  some 
irregularities  in  the  records.  For  these  reasons  definite  conclusions  on  some  of  the 
questions  on  the  action  of  the  ballast  must  be  deferred. 

The  runs  at  speeds  up  to  and  including  60  miles  per  hour  were  made  with  a  heavy 
and  a  light  car  behind  the  locomotive.  The  rail  depressions  given  by  the  wheels  of 
the  heavy  car  at  all  locations  for  both  rails  are  shown  in  Fig.  20.  The  depressions  at 
Location  S  are  seen  to  be  somewhat  less  than  at  the  other  locations.  Location  S  had 
the  least  amount  of  play  and  the  difference  in  depression  there  is  probably  due  to 
the  lesser  play  rather  than  to  a  higher  value  of  the  modulus  of  the  support. 

In  general  there  is  seen  to  be  little  increase  with  speed  in  the  amount  of  the 
depressions  under  the  car  up  to  the  highest  speed  used,  and  in  some  cases  a  decrease. 
The  depression  at  Gage  Location  4  shows  the  largest  increase  in  depression  with  increase 
in  speed.  The  larger  increases  and  decreases  in  depression  were  generally  accompanied 
by  similar  changes  in  the  moments  developed,  as  shown  by  a  comparison  of  Fig.  20 
with  Fig.  18. 

From  the  discu.=sion  and  the  diagrams  it  is  evident  that  the  recorded  depressions 
were  similar  in  form  and  magnitude  to  the  calculated  depressions  for  both  the  locomo- 
tive and  the  cars.  There  appears  to  be  little  if  any  increase  in  depression  due  to  speed 
alone.  The  changes  are  apparently  due  to  the  action  of  the  locomotive  or  car  as 
influenced  by  the  conditions  of  the  track  traversed  prior  to  passing  the  instrument 
positions.  The  locomotive,  especially  at  the  higher  speeds,  has  oscillations  or  lateral 
movements  as  a  whole  or  in  its  parts  that  cause  considerable  variation  in  the  load 
applied  by  the  individual  wheels  and  likewise  transfers  of  load  between  the  wheels  on 
the  same  axle.  Similar  action  by  the  locomotive  was  indicated  by  the  stresses  and 
moments  discussed  in  Article  9  "Stresses  and  Moments  in  Rail." 


Depression    of    Track 


171 


0.10 

0.15 

0.20 

0.10 

^  0.15 
(J 

"^  0.20 
,c 

.1  0.10 

<D 

^0.15 

Q 

CO  0.20 

^  0.10 

0.15 

0.20 

0.25 


Location    4 


Location    5 


Location    6 


First  Wlieel 


•_•-•- 


Second    Wheel 


^^^^ 


Third    Wheel 


0      20     40    60     80  100  0      20     40     60     80  100  0      20     40     60     80   100. 
Speed  in    Miles   per  Hour 

Fig.  20. — Gross  Depression  of  Left  and  Right  Rail  at  the  Wheels  of  the  Heavy 
Car  at  Various  Speeds. 


(a) 


(b) 


(c) 


0 


R 


fip- — 


Q 


iillMlk 


0 


R 


R  R 


Fig.  21. — Diagram  Showing  Vertical 
Load  Pressures  and  Reactions  on  Joint 
Bars,  (a)  Single  Reaction  Bearings  for 
Positive  Moment,  (b)  Double  Reaction 
Bearings  for  Positive  Moment,  (c) 
Single  Reaction  Bearings  for  Negative 


p^"  Moment. 


R 


..if 


172 


Stresses    in    Railroad    Track 


400000 


200 000 


20    16    12    8     4      0    4      8     12    16  20  16    12    8    4      0    4     8     12   16  20 
Distance    in    Inches   from    Mid-  length 

Fig.  22. — Typical  Positions  and  Values  of  Bearing  Loads  and  Reactions  That 

Would  Develop  the  Moments  Observed  in  Two  Bars  at  Sections 

along  the  Joint  Bars. 


Rail    Joints    and    Their    Action ^^^L 

By  means  of  an  engineer's  level  and  a  special  leveling  rod,  measurements  of  the 
depression  of  the  right  rail  with  a  light  and  a  heavily  loaded  car  were  made  for  the 
determination  of  the  modulus  of  elasticity  of  the  rail  support,  «.  The  method  used  wa? 
similar  to  that  described  at  page  197  of  the  Sixth  Progress  Report,  AREA  Proceedings, 
Vol.  35,  1934.  The  end  wheels  were  spotted  at  gage  Location  S.  The  wheel  loads  averaged 
6,000  lb.  and  26,500  lb.,  respectively.  The  heavy  load  gave  a  gross  depression  of  0.20  in. 
The  play  of  the  right  rail  at  Location  5  was  estimated  from  these  measurements  to  be 
0.05  in.  The  modulus  was  calculated  to  be  2,500  lb.  per  in.  per  in. 

IV.  Tests  of  Rail  Joints 

11.  Rail  Joints  and  Their  Action. — The  action  of  the  joint  bars  in  a  joint 
is  discussed  at  some  length  in  the  Fifth  Progress  Report  under  the  title  "II.  General 
Structural  Action  of  the  Rail  Joint"  and  in  other  places  in  that  report  and  also  in 
the  Sixth  Progress  Report.  It  will  be  of  advantage  here  to  review  briefly  some  ele- 
mentary matters  regarding  some  of  the  principal  forces  developed  in  the  rail  joint 
between  rail  and  bars  and  their  probable  position. 

The  forces  and  pressures  and  reactions  developed  in  the  interaction  between  rail 
and  bars  due  to  the  wheel  load  and  the  bending  action  of  the  joint  on  the  tie  supports 
may  be  represented  as  in  Fig.  21.  For  positive  moment  (downward  deflection  of  joint), 
the  bars  will  act  as  beams  with  loads  or  vertical  forces  applied  to  the  top  fishing 
surface  of  the  bar  by  the  under  side  of  the  rail  head  for  short  distances  back  from 
the  rail  ends  as  indicated  at  Q  in  (a),  and  with  reactions  applied  by  the  rail  base  to 
the  lower  fishing  surface  of  the  bar  at  points  toward  the  ends  of  the  bar  as  indicated 
at  R.  In  many  or  most  cases  with  close  fit  there  are  two  sets  of  the  reactions,  one  set 
towards  the  ends  of  the  bars  at  R"  and  R"  and  the  other  set  R'  and  R'  closer  to  the 
middle  of  the  bar  but  outside  of  the  position  of  the  loads  Q,  as  indicated  in  (b).  The 
position  of  the  loads  and  reactions  and  their  centroids  is  dependent  upon  the  length 
of  the  bar  and  particularly  on  the  fit  between  bar  and  rail.  The  moment  of  resistance 
developed  in  the  bars  is  the  sum  of  the  products  of  R'  and  R"  on  one-half  of  the  bars 
by  their  respective  horizontal  distances  to  the  line  of  action  of  Q,  and  this  resisting 
moment  is  equal  to  the  bending  moment  applied  or  developed  by  the  wheel  loads, 
whatever  that  may  be.  For  negative  moment  (upward  bending),  the  positions  of  the 
loads  and  reactions  applied  to  the  bar  are  reversed,  as  indicated  in  (c). 

It  is  apparent  that  all  these  loads  and  reactions  applied  to  the  bar  exist  in  addition 
to  the  interactions  between  bar  and  rail  produced  by  the  existence  of  the  tension  in  the 
bolts.  In  fact,  the  resultants  of  all  the  forces  applied  to  a  bar  will  increase  or  decrease 
the  pressure  between  bar  and  rail  at  a  given  point  materially  and  may  in  places  even 
relieve  contacts  between  surfaces. 

To  give  a  conception  of  the  magnitude  and  position  and  variety  of  the  vertical 
loads  and  reactions  applied  to  the  bars  by  the  rails  Fig.  22  is  given,  taken  from  Figs.  82 
and  83  of  the  Sixth  Progress  Report.  The  values  and  positions  of  these  loads  and 
reactions  were  calculated  from  strain-gage  measurements  in  laboratory  tests  and  field 
tests  and  from  the  resulting  magnitude  and  distribution  of  the  moments  calculated 
therefrom.  It  is  apparent  that  the  magnitude  of  the  load  applied  to  a  bar  by  the  rail 
(bearing  pressure)  depends  not  only  on  the  wheel  load  but  also  on  the  fit  between  rail 
and  bar,  and  especially  on  the  positions  of  the  centroids  of  the  reaction  forces  as  they 
may  be  developed  in  the  joint.  For  example,  if  the  horizontal  distance  from  the  centroid 
of  bearing  pressure  on  the  top  of  a  bar  to  the  centroid  of  the  reaction  force  R'  is  small 
and  the  magnitude  of  R'  in  Fig.  21  is  relatively  large  with  respect  to  that  of  R",  the 
bearing  pressure  Q  will  be  relatively  greater  than  otherwise,  and  if  this  bearing  pressure 


174  StressesinRailroadTrack 

is  distributed  over  a  small  bearing  area  the  intensity  may  be  unduly  great.  It  follows 
that  the  presence  of  a  relatively  small  R'  will  result  in  a  smaller  Q  and  thus  that  the 
wear  between  bar  and  rail  head  will  be  decreased. 

In  Fig.  23  is  given  a  diagrammatic  division  of  moment  between  rail  and  joint  bars 
for  an  assumed  total  moment  produced  by  a  wheel  load  applied  at  the  mid-length  of  a 
joint;  AB  represents  the  part  taken  by  the  joint  bars  and  BC  that  taken  by  the  rail. 
In  Fig.  24  are  shown  values  of  moments  in  the  two  bars  at  eleven  sections  along  their 
length  as  a  load  is  advanced  across  a  joint.*  It  is  apparent  that  bending  moment  is 
developed  in  sections  all  along  the  length  of  the  bars  well  before  a  wheel  load  reaches 
a  point  over  the  bars  and  therefore  curvature  in  the  bars  commences  in  advance.  Thus,  in 
case  of  worn  or  ill-fitting  joints  the  vertical  movement  to  give  loading  contact  between 
bar  and  rail  will  take  place  before  the  joint  is  reached  and  the  shock  is  minimized. 

The  foregoing  discussion  assumes  known  conditions  of  span  and  supports,  as  are 
obtained  in  a  laboratory  test.  In  track,  the  condition  of  the  supports  at  a  joint  are 
more  variable  than  along  the  rest  of  the  rail.  Even  if  originally  the  joint  ties  had  as 
even  bearing  and  as  uniform  supporting  stiffness  as  may  be  found  over  the  rest  of  the 
rail  length,  the  lesser  stiffness  of  the  rail  joint  (resistance  to  rail  deflection)  will  result  in 

Total  moment  y7\\.      Moment  taken 

developed  in  rail    //   \^by  rail 
and  rail -joint 


Moment  taken  by       ^.^    23.-Division  of  Moment  between 
jomt  bars  ^^y  ^^^  j^^^^  g^j.^ 


higher  loads  being  transmitted  to  the  joint  ties  and  ballast  and  therefore  finally  in 
greater  permanent  depression  of  the  joint  support.  Furthermore,  as  play  and  uneven 
wear  between  rail  and  bars  will  permit  downward  movement  of  the  joint  without  de- 
veloping correspondingly  greater  bending  resistance  in  the  joint  itself,  the  support  at 
the  joint  will  become  still  further  depressed.  These  conditions  and  the  smaller  vertical 
stiffness  of  the  rail  joint  as  a  whole  will  result  of  course  in  the  joint  giving  the  effect 
of  a  softer  spot  in  the  track  as  compared  with  the  rest  of  the  rail  length.  In  tests  of 
track,  one  of  the  ways  by  which  this  softness  or  reduction  in  stiffness  may  be  judged  is 
through  the  value  of  the  ratio  of  the  bending  moment  found  to  be  developed  at  the 
joint  to  that  ordinarily  developed  in  the  full  rail.  Obviously  the  more  nearly  this  joint 
moment  ratio  approaches  unity  the  less  the  opportunity  for  low  joints  and  for 
rail  batter. 

A  conception  of  the  changes  in  moments  and  depressions  of  a  rail  joint  having 
well-fitting  bars  and  little  play  between  rail  and  tie,  as  one  of  a  group  of  wheels  passes 
over  the  joint,  may  be  obtained  from  the  closely  similar  developments  of  moment  and 
depression  of  the  full  rail  as  shown  by  analysis  or  by  the  oscillograph  records  of 
stresses  and  depressions  for  rail  away  from  a  joint.  The  changes  will  depend  upon  such 
matters  as  wheel  spacing  and  stiffness  of  rail  support.  In  a  general  way  a  wheel  of  a 
group  may  be  expected  to  be  20  to  30  in.  or  more  from  the  rail  end  when  the  positive 
bending  in  the  bars  begins  and  it  will  travel  this  distance  before  the  wheel  is  at  the  raU 
gap  and  the  bars  are  given  their  maximum  moment.  For  electric  locomotive  No.  4779 
this  distance  was  probably  about  24  in. 

"  See  Article  8  "Action  of  a  Rail  Joint  under  an  Advancing  Load"  in  Sixth  Progress  Report, 
AREA    Proceedings,   Vol.   35,    1934,   page    110. 


Rail    Joints    and    Their    Action 


175 


to 


Designation     of    Position    of    Lnnd 
O  D  E  F  G  H  I 


-  100  000- 

-200  000 

WO  000 

0 

200  000 

100000 

o 

300  000 
200  000 
100  000 
0 
•c  4  00  000 
^  300  000 
^"  200  000 
~  100  000 

%  0 

0  3  00  000 
c  200000 

1  100  000 
I        0 

2  00  000 
100  000 

0 
100  000 

0 

0 
-  100  000 

-200  000     _^^.^     _ig.^    _i^.^    _gj^        g  Qj^       ,2/V».     I8in.     24in. 

fbsition  of  Section  with  Respect  to  /\/ticf- length    of 
Joint   Bar 

Fig.  24.— Moments  in  Two  Bars  at  Various  Sections  on  Applying  a 

Load  of  3,3,300  lb.  at  Middle  of  48-in.  Span  with 

Rail  Joint  Advancing. 


u. 

^ 

I  1  1  1  '  1 

Joint  Inverted 

1 

4^ 

/\ 

! 

u 

JOi 

1 

18  in.  north  of  rail  ends 

\ 

a 

1 

\ 

^ 

^ 

•t 

>-< 

I 

V 

rr 

Looa 

12  i 

D 

1 
1 

no 

rth 

1  ^ 

A 

/ 

\ 

S[ 

- 

^ 

f^ 

N^ 

s 

S 

J 

Load  6i 

n.  no 

rtl 

^ 

E 

/ 

/ 

\ 

V 

/ 

1 

( 

^ 

s 

- 

- 

i 

^ 

S^ 

s 

> 

1 

1 

\ 

\ 

i 

i 

1 

„_ 

4 

in. 

- 

- 

.   ) 

y 

N 

( 

- 

Load  at 

mid 

-sec 

lionj 

\ 

( 

^ 

i 

N 

\ 

- 

( 

M 

< 

t 

N 

1 

; 

s, 

H 

^ 

I 

, 

G 

Li 

la 

i 

5i 

1. 

sc 

7Ut 

f) 

/ 

\ 

k 

N 

r^ 

/ 

u 

\ 

> 

i 

ou 

) 

V 

n' 

S 

s 

^ 

Loa 

1 

d 

12 

in 

th 

f^ 

^ 

r^ 

/ 

> 

N 

) 

1 

1 

jr- 1 

s 

1    1 
Load 

1 

8  in. 

s 

ou 

h 

/ 

V 

V 

r-" 

s 

k 

1 

I' 

i 

—^ 

y 

\ 

^ 

1 

J 

oil 

\l  Inverte 

i 

\ 

V 

r 

/ 

- 

176     Stresses    in    Railroad    Track 

It  should  be  understood  that  aside  from  being  a  connecting  link  between  adjoining 
rails  and  acting  to  preserve  continuous  alinement  and  surface,  it  is  highly  desirable 
that  the  rail  joint  should  approximate  to  uniform  continuity  of  beam  action  over  its 
supporting  ties  and  ballast  and  should  furnish  to  as  great  a  degree  as  possible  the  same 
stiffness  of  beam  as  does  the  rail.  This  means  that  its  construction  should  be  such 
that  it  will  apply  as  closely  as  possible  the  same  loads  and  pressures  to  the  ties  as  are 
given  throughout  the  rest  of  the  rail.  The  value  of  any  particular  form  of  rail  joint 
is  dependent,  of  course,  upon  its  behavior  in  these  respects  and  upon  its  resistance  to 
wear  and  other  deterioration  throughout  its  Hfe. 

It  is  apparent  that  with  the  variations  in  support  provided  in  track  and  with  the 
differences  in  types  and  conditions  of  joint  bars  there  will  be  wide  variations  in  the 
magnitude  of  the  bending  moments  developed  in  rail  joints.  For  similar  conditions  of 
track  the  magnitude  of  the  bending  moment  developed  becomes  a  measure  of  the  effec- 
tiveness of  the  joint.  The  stresses  measured  at  two  gage  lines  in  the  upper  and  lower 
part  of  a  section  at  mid-length  of  the  joint  bars  offer  the  best  means  for  finding  the 
magnitude  of  the  bending  moment  developed  in  the  joint  bars  at  the  rail  gap. 

In  Articles  13  and  14  of  the  Fifth  Progress  Report  (Proceedings  American  Railway 
Engineering  Association,  Volume  31,  1930,  pages  99-112)  analyses  are  given  of  the 
flexural  action  of  both  the  symmetrical  and  the  unsymmetrical  types  of  joint  bar.  On 
the  assumption  that  the  strains  measured  in  joint  bars  are  representative  of  the 
bending  stresses,  the  bending  moment  developed  in  a  joint  may  be  calculated  by 
substituting  in  Equation  (67)°  of  the  Fifth  Progress  Report  measured  stresses  Si  and  S2  of 
any  two  gage  lines  used  such  as  B  and  C  in  the  tests  under  discussion.  This  equation 
takes  into  account  any  inclination  of  the  neutral  axis  from  the  horizontal.  As  brought 
out  in  Article  13  "Laboratory  Tests  to  Find  Gage  and  Stress  Relations  and  Conversion 
Ratios",  various  deformations  of  the  bars  due  to  forces  other  than  the  forces  assumed 
in  ordinary  beam  analysis  introduce  variations  from  the  assumptions  of  the  analysis. 
In  Article  13  the  empirical  use  of  conversion  ratios  is  presented  for  use  in  making 
calculations  of  the  bending  moments  developed  in  the  field  tests. 

Some  readers  may  find  interest  in  Articles  47-55  of  "VII.  Discussion  of  Tests  of 
Rail-Joints"  in  the  Sixth  Progress  Report  (AREA  Proceedings,  Vol.  35,  1934,  pages 
244-277). 

12.  The  Joint  Bars  and  the  Test  Schedules. — The  tests  in  track  were  made 
with  bars  of  four  different  sections  as  follows:  Pennsylvania  Railroad  F-4  symmetrical 
bar,  Baltimore  &  Ohio  Railroad  B-19  symmetrical  bar,  Norfolk  &  Western  Railway 
A-39  angle  bar,  and  Chesapeake  &  Ohio  Railway  B-43  head-free  bar.  The  sections  of 
these  bars  and  the  location  of  the  gage  lines  for  the  field  tests  are  shown  in  Fig.  25. 
The  position  of  the  gage  lines  was  the  same  on  both  inner  and  outer  bar.  Geometrical 
properties  are  given  in  Table  4.  The  last  three  bars  may  be  termed  heavy  bars,  the 
F-4  being  somewhat  lighter.  The  moment  of  inertia  about  the  horizontal  axis  (h) 
ranges  from  12.20  to  19.63.  The  product  of  inertia   (Jxy)    ranges  from  0.75  to  4.17.  By 

''  Equation   (67)   is 

"-=i:M^''+-is^'- <"> 

where  M^  is  the  vertical  moment  (resisting  moment  in  the  vertical  plane),  x^  and  y^  are  the  abscissa 
and  the  ordinate  of  the  point  in  the  section  for  gage  line  1  taken  with  reference  to  the  horizontal 
and  vertical  geometrical  axes  of  the  section,  and  x^  and  y^  are  similarly  the  coordinates  for  gage  line 
2,  and  s^  and  s^  are  the  corresponding  measured  stresses,  respectively,  at  the  two  gage  lines.  I^  and  / 
are  the  moments  of  inertia  of  the  section  of  the  bar  with  respect  to  its  horizontal  and  vertical  gravity 
axis,  respectively,  and  J      is  the  product  of  inertia  with  respect  to  the  two  axes. 


Joint    Bars    and    Test    Schedules 


177 


Table  4 

Description  and  Geometrical  Properties  of  the  Joint  Bars 

Units  are  inches  and  pounds.  All  values  are  for  a  single  bar. 
Bars  are  for  131-lb.  R.E.  rail.  The  subscript  denotes  the  axis 
to  which  the  properties  correspond. 


Name 

Type  of 
Section 

Length 

of 

Bar 

h 

h 

^xy 

Section 
Modulus 

Area 

P.R.R..  F-4 

Symmetrical 

.  36 

12.20 

0.80 

0.75 

4.81 

5.20 

B.  &.  0.,  B-19 
N.  i  W.,  A-39 

Symmetrical 
Angle  bar 

£4 

end  36 

36 

16.69 
19.63 

1.85 
3.77 

1.06 
4.17 

6.52 
7.14 

6,58 
6.52 

C.  &  0.,  B-43 

Head-free 

36 

16.05 

1.70 

2.12 

6.32 

6.26 

Table  5 

Analytical  Properties  of  the  Joint  Bars. 

Values  are  based  on  analyais  given  in  Fifth  Progrecs  Report, 
Article  1^.  K^  '.epresents  the  vertical  bending  moment  and  !ty 
the  lateral  bending  moment.  (X  is  the  angle  of  inclination 
gf.  the  neutral  axis  from  the  horizontal. 


Name  and  Section 

Free  Bending 

Value  of 
for  Given 

value 

required 
of  tan  ex 

Tan  ex 

ex 

0 

0.3 

0.75 

P.R.R.,  F-4 

.938 

43*'-10' 

.061 

.043 

.013 

B.  &.  0,,  B-19 

.572 

29°-47' 

.063 

.030 

N.  i  V;.,  A-3& 

1.104 

47''-50' 

.C12 

.165 

.081 

C.  &.  0.,  B-43 

l.o48 

510-18' 

.132 

.104 

.058 

the  analyses  for  bending  given  in  the  Fifth  Progress  Report  and  the  discussions  and 
interpretations  given  in  the  Sixth  Progress  Report",  the  F^  and  B-19  may  be  con- 
sidered for  ordinary  purposes  to  be  symmetrical  bars.  Substitution  of  the  values  of  Ix 
and  Jxy  in  equations  (47)  and  (51)  of  that  report  will  indicate  the  extent  to  which 
the  other  two  bars  depart  from  symmetrical  action. 

The  bars  were  generally  used  in  the  condition  in  which  they  came  from  the  mill. 
The  term  full  bearing  (FB)  is  given  to  bars  having  continuous  bearing  fishing  surfaces 
along  their  length.  Bars  having  bearing  restricted  to  certain  portions  of  the  length 
of  fishing  surfaces  are  termed  controlled  bearing  bars  (CB).  Bars  used  in  the  condition 
received  from  the  mill  are  termed  "as  is"  (AI).  Bars  were  machined  to  true  and 
straight  fishing  surfaces  along  their  length  and  these  are  termed  machine  fit  bars  (MF). 
After  machine  fit  bars  had  been  tested  in  track  the  top  fishing  surface  through  the 
middle  portion  was  ground  down  O.OS  in.  at  mid-length  and  tapered  uniformly  to  zero 
at  a  point  4  in.  from  the  leaving  rail  end  also  to  zero  at  a  point  6  in.  from  the 
receiving  rail  end;  these  are  termed  simulated  wear  bars  (SW).  Two  pairs  of  F-A  bars 
were  selected  from  stock  as  representing  greater  than  usual  camber  of  bars  as  obtained 
from  the  mill  and  are  termed  high  camber  bars  (HC).  Two  pairs  with  downward  con- 


•AREA   Proceedings,   Vol.   31,    1930,   page  65;    and   Vol.   35,    1934,   page  66. 


178 


Stresses    in    Railroad    Track 


N.aW.  Ry.    A-39 


B.aO.R.R.     B-19 


CaO.  Ry.    8-43 


Fig.  25. — Sections  of  Joint  Bars  and  the  Positions  and 
Designation  of  the  Gage  Lines  Used. 


Outer  Bar 


Inner  Bar 


Fig.  26. — Position  of  Four  lY^-in.  Magnetic 

Strain  Gages  at  Mid-Length  of 

Joint  Bars. 


Joint    Bars   and    Test    Schedules 


179 


Schedules  of  Rail-Joint  Tests 

Stresses,  vertical  movements,  and  longitudinal  movements  were 
measured  unless  otherwise  noted. 


Schedule 

Run  No. 

Condition 

Bearing 

Length 

Loca- 

Speeds 

No. 

of  Bar 
Inches 

tions 

Pennsylvanie 

F-4  Bars 

5,6,7 

78  -  116 

AI 

re 

36 

1,2.3 

5,40,60,90 

33* 

391  -  399 

AI 

FB 

36 

1 

5,60,90 

11,12,13 

155  -  203 

IIT 

FB 

36 

1.2.3 

5,40,60,90 

20,21,22 

267  -  294 

SW 

FB 

36 

1.2,3 

5,60,90 

2, 2a, 3, 4 

35  -  77 

AI 

CB 

36 

1.2 

5,40,60,90 

8, 9, lot 

117  -  154 

ICF 

CB 

36 

1,2 

5,40,60,90 

31* 

372  -  380 

SW 

CB 

36 

1 

5,60,90 

34,35,36* 

400  -  431 

w 

CB 

36 

1.2.3 

5,60,90 

37* 

432  -  440 

w 

CB 

36 

1,2.3 

5,60,90 

31* 

372  -  380 

HC 

CB 

36 

2,3 

5,60,90 

i2,i.3° 
39* 

381  -  399 

HC 

CB 

36 

2 

5,60,90 

450  -  463 

HC 

CB 

36 

2.3 

5,60,90 

30* 

363  -  371 

NC 

CB 

36 

2,3 

5,60,90 

Baltimore  k   Ot 

lo  B-19  Bars 

17, 18, 19* 
38i 

240  -  266 

AI 

FB 

36 

1,2.3 

5.60,90 

441  •  449 

AI 

FB 

36 

1.2,3 

5,60,90 

14,16,16 

204  -  239 

MF 

FB 

36 

1,2,3 

5,40,60,90 

23,24,25 

295  •  326 

UF 

FB 

24 

1,2,3 

5,60,90 

26,27,28 

327  -  353 

SW 

FB 

36 

1,2 

5,60,90 

26.27,28 

29* 

327  -  353 

SW 

FB 

24 

3 

5,60,90 

354  -  362 

MF 

CB 

36 

1 

5,60,90 

30* 

363  -  371 

JJF 

CB 

24 

1 

5,60,90 

NorfolK  i  Weste 

rn  A-39  B 

ars 

29* 

354  -  362  1    AI 

FB 

36 

2,3 

5,60,90 

Chesapeake  (l   Oli 

lo  B-43  B 

ars 

2, 2a, 3, 4 

35  -  77       AI 

HF 

36 

3 

5,40,60,90 

8, 9, lot 

117  -  154      AI 

HF 

36 

3 

5,40,60,90 

*  Stresses  only  measured. 

t  Electric  locomotive  4790  used  instead  of  4779. 

i  Rail  stresses  measured  18  in.  from  mid-length  of  the  joint. 

°  Joint  depressions  measured. 


vexity  are  termed  negative  camber  bars  (NC).  Three  pairs  of  F-4  bars  originally  in- 
stalled in  1933  were  selected  from  main  line  track  under  heavy  traffic  to  be  representa- 
tive of  worn  condition  (W).  The  corresponding  original  rails  were  also  brought  to  the 
test  track  and  the  rails  and  bars  were  laid  in  their  original  relation.  However,  the  wear 
on  these  bars  was  not  very  great  as  compared  with  conditions  in  track  with  lower 
standards  of  maintenance.  The  joint  bars  were  all  36  in.  in  length  with  the  exception 
that  four  pairs  of  B-19  bars  had  a  length  of  24  in.  For  convenience  and  brevity  the 
conditions  and  variations  named  above  will  be  referred  to  by  the  short  names  or  the 
abbreviations  here  given. 

Fig.  26  shows  a  cross-section  of  an  assembly  of  B-19  bars  and  131-lb.  R.E.  rail 
and  four  magnetic  strain  gages  for  measuring  longitudinal  stresses  in  the  bars.  The 
effect  of  the  offset  of  the  gages  from  the  surface  of  the  bar  shown  in  the  figure  has 
been  considered  in  the  calculation  of  moments  from  the  measured  stresses. 

As  determined  by  the  use  of  thickness  gages  all  the  bars  except  the  simulated  wear 
and  the  worn  bars  fitted  the  rail  quite  closely.  This  fit  between  bar  and  rail  probably 
was  considerably  better  than   is  usually   found  with   the   ordinary   run   of   joint   bars. 


1  so  S  t  r  c  s  s  c  s    i  n    R  a  i  I  r  o  a  d    T  r  a  c  k 

In  the  te.^s  it  was  found  necessary  to  apply  a  relatively  high  bolt  tension,  20,000  to 
30,000  lb.,  because  of  the  need  of  preventing  movement  of  ends  of  rails  by  changes 
in  temperature  during  the  hours  of  the  test. 

The  schedules  of  the  tests  on  the  rail  joints  in  track  are  given  in  Table  6.  Runs, 
speeds,  joint  locations,  and  kind  and  condition  of  bar  are  tabulated.  Study  of  this 
table  will  give  a  good  comprehension  of  the  scope  and  variety  of  the  tests.  The  column 
"Joint  Location"  indicates  whether  one,  two,  or  three  joints  of  a  given  kind  and 
condition  were  tested. 

13.  Laboratory  Tests  to  Find  Gage  and  Stress  Relations  and  Conversion 
Ratios.^ — In  Article  13  'Tlexural  Action  of  the  Unsymmetrical  Type  of  Joint  Bar"  in 
the  Fifth  Progress  Report  of  the  Committee  on  Stresses  in  Railroad  Track'  are  given 
analytical  methods  for  finding  the  relation  between  bending  moments  and  stresses 
which  apply  to  both  symmetrical  and  unsymmetrical  types  of  bar.  These  analyses  con- 
sider only  the  bending  action  of  the  joint  bars  with  the  usual  assumptions  of  propor- 
tionality of  stress  to  distance  from  a  neutral  axis.  The  analyses  do  not  consider  the 
effect  of  bearing  pressures  on  the  magnitude  of  longitudinal  strains  and  the  presence 
of  other  conditions  that  affect  longitudinal  strains.  When  the  wheel  load  is  applied  to 
the  rail  joint,  the  bearing  pressure  of  rail  on  bar  developed  at  certain  points  along  the 
fishing  surfaces  and  the  Poisson-ratio  action  sets  up  longitudinal  strains  not  considered 
in  the  analyses.  The  eccentricity  of  loading  by  the  forces  applied  by  the  rail  head  to 
the  joint  bar  at  points  on  the  upper  fishing  surface  and  the  reactions  taken  by  the  rail 
base  also  introduce  conditions  not  taken  into  account  in  the  analyses.  Another  influence 
not  considered  is  the  tension  in  the  bolts,  which  in  effect  has  produced  longitudinal 
strains  in  the  bars  by  lateral  bending  and  concentrations  of  pressure  on  the  fishing 
surface.  Also  the  change  in  the  relative  position  of  rail  and  bars  at  certain  points,  upon 
the  application  of  wheel  load  (although  seemingly  small),  results  in  a  variation  in  these 
longitudinal  strains  that  has  an  appreciable  effect  upon  the  measured  longitudinal 
strains.  Altogether  the  action  of  the  rail  joint  is  very  complex  and  the  stresses  in  the 
bars  are  the  results  of  numerous  forces.*  Some  method  of  estimating  the  effect  of  the 
additional  strains  set  up  in  the  joint  is  needed  before  a  satisfactory  interpretation  of 
the  data  of  the  track  tests  may  be  made. 

No  analytical  method  for  taking  into  account  actions  of  such  complexity  has  been 
found.  In  the  absence  of  a  rational  method  experimental  determinations  in  the  laboratory 
were  made  of  the  ratio  between  the  bending  moment  applied  to  the  rail  joint  and  that 
calculated  from  the  measured  longitudinal  strains  developed  in  the  joint  bars.  From 
these  data  empirical  conversion  ratios  were  found  for  the  various  types  and  conditions 
of  rail  joints  used  in  the  track  tests.  This  experimental  method  has  given  values  for 
the  conversion  method  that  insure  reasonable  accuracy  for  the  calculation  of  the 
magnitude  of  the  moments  developed  in  the  track  from  the  stresses  measured. 

Laboratory  tests  were  made  on  joints  having  the  identical  bars  used  in  the  track 
tests,  together  with  two  pieces  of  rail  cut  from  rails  also  used  in  the  track.  The  joints 
were  loaded  as  a  simple  beam  with  a  single  load  at  the  middle  of  a  48-in.  span.  The 
two   loads   used   in   the   laboratory    were    25,000    lb.   and    33,300    lb.,    which    developed 


'AREA  Proceedings,  Vol.  31,   1930,  page  100. 

^  Reference  may  be  made  to  a  discussion  on  variations  from  proportionality  of  stress  to  distance 
from  neutral  axis  and  effect  of  bearing  pressure  in  Article  19  "Inclination  of  the  Neutral  Axis  of  the 
Joint    Bars   at    Various   Sections   Along   Their  J^ength",   page    138   of   the   Fifth   Progress   Report   of   the 

tide   26, 
made    to 

.        -   ,    .    „-    -    -    - _ o.^~   ^„ — .    Proceedings, 

Vol.    35,    193^,    for   a   discussion   of    methods   of   conversion    previously   used    in   determining   magnitude 
of  bending  moments  from  measured  stresses. 


joint    Bars   at    Various   Sections   Along   Their  Length",   page    138   of   the   Fifth   Progress   Report 
Committee   on   Stresses   in   Railroad  Track,   AREA   Proceedings,   Vol.   31.    1930,   and  also   to  Arti 
"Miscellaneous    Experimental    Data",    page    189    of    the    same    report.  Reference    may    also    be    m 
Article    19,    "Moments   in    Rail   Joints",   page    146   of   the   Sixth   Progress   Report,    AREA    Proce 


4 


Tests    for    G  a  K  c    and    Stress    Relations 


181 


moments  at  mid-span  of  300,000  in. -lb  and  400,000  in.-lb.,  respectively,  loads  and 
moments  being  comparable  to  those  of  the  field  tests.  The  stresses  were  measured  with 
a  2j4-in.  strain  gage,  the  gage  length  used  in  the  field  tests.  As  the  magnetic  strain 
gage  used  in  the  field  tests  was  offset  from  the  surface  of  the  bar  and  the  effective 
point  of  measurement  of  the  stress  had  been  found  by  the  Test  department  of  the 
Pennsylvania  Railroad  to  be  0.45  in.  from  the  surface  (a  distance  equal  to  the  distance 
between  the  surface  of  the  bar  and  the  geometrical  axis  of  the  gage  coil)  this  condition 
was  simulated  for  gage  lines  B  and  C  in  the  laboratory  tests  (see  Fig.  25  for  position 
of  gage  lines  B  and  C)  by  screwing  studs  into  the  holes  used  for  mounting  the  magnetic 
strain  gages  and  reading  the  stresses  in  gage  lines  in  the  heads  of  these  studs  0.45  in. 
out  from  the  surface  of  the  bars.  Readings  were  also  taken  with  studs  of  such  length 
that  the  gage  points  were  at  the  surface  of  the  bars.  All  tests  were  made  with  the  high 
bolt  tension  used  in  the  field  tests,  (25,000  lb.  or  more)  a  condition  which  had  been 
found  necessary  in  the  track  to  control  the  rail  gap  as  the  temperature  of  the  rail 
changed  during  the  day.  It  bad  been  found  in  the  field  tests  that  any  large  change  of  gap 
was  detrimental  to  the  interpretation  of  the  indications  given  by  the  magnetic  strain 
gages  used  to  measure  the  longitudinal  movement  between  the  outer  bar  and  the  rail 
head  near  its  end,  besides  possibly  damaging  the  instruments.  It  can  be  seen  from  this 
discussion  that  the  conditions  of  the  joints  in  the  laboratory  tests  closely  simulated  the 
conditions  of  the  joints  for  the  field  tests. 

A  typical  stress  distribution  over  a  vertical  section  of  the  bars  at  mid-length  is 
shown  in  Fig.  27  for  a  test  of  the  B-19  joint  bars,  a  symmetrical  bar  of  heavy  cross 
section.  The  position  of  the  gage  lines  on  the  section  is  indicated  by  the  numbered 
points  on  the  side  of  the  section.  Gage  lines  B  and  C  correspond  to  gage  lines  used  in 
the  field  tests;  these  two  positions  are  as  near  the  top  and  bottom  of  the  bar  as  the 
gages  could  be  placed  in  the  track.  In  the  figure  the  magnitude  of  the  measured  stress 
is  plotted  with  respect  to  its  vertical  distance  from  a  horizontal  axis  through  the 
center  of  gravity  of  the  section.  The  full  lines  are  for  the  33,300-lb.  load  and  the 
broken  lines  for  the  25,000-lb.  load.  The  straight  full  lines  passing  through  the  inter- 
section of  the  center-of-gravity  axis  and  the  axis  of  zero  stress  indicate  the  theoretical 
variation  of  stress  over  the  section  for  the  two  loads.  The  effect  of  the  bearing  pressures 
and  various  other  forces,  as  well  as  possibly  some  inclination  of  the  neutral  axis  from 


30      -20 


b>esi    in    Thousands    ot  lb    per    ic/ 
'10  0  10      -20       -10 


10       20 


-\ 

b.      ■      - 

— ♦^Vi 



_  _ 

*\ 

'^ 

^ 

\\ 

— ^^. 

V^Vi 



\   \ 

\ 

w 

"^ 

\\\ 

•Oute 

r   Bar 

"^    \^ 

s 

\ 

'dinner    Bar 

S.  1 

\, 

^ 

3^\ 

, 

. , 







-  _  _- 

P=  33  300  lb. 


P- 25  000  lb 


Fig.  27. — Observed  Stresses  in  Various  Gage  Lines  at  Mid-Length  of 
B-19  Joint  Bars. 


182 Stresses    in    Railroad   Track 

horizontal,  can  be  plainly  seen  in  the  curving  of  the  lines  of  stress  distribution  making 
the  stresses  at  B  smaller  than  the  theoretical  stress  and  those  at  the  higher  gage  hnes 
either  higher  than  the  theoretical  value  or  close  to  it.  A  calculation  of  the  vertical 
moment  in  the  joint  from  the  stresses  in  gage  lines  B  and  C  by  Equation  (67)*  gives 
265,000  in.-lb.  for  the  load  of  33,300  lb.  which  is  only  66  percent  of  the  applied  moment. 
For  the  load  of  25,000  lb.  the  calculated  moment  is  65  percent  of  the  applied  moment, 
a  closely  similar  value.  It  may  be  well  to  call  attention  to  the  impracticability  of 
measuring  the  stresses  on  the  side  of  the  bar  next  to  the  rail;  obviously  their  magnitude 
will  be  different  from  those  at  the  gage  lines  used. 

From  the  tests  outHned  above  values  of  the  conversion  ratio  were  obtained  for 
the  individual  joints  by  dividing  the  applied  bending  moment  by  the  moment  calculated 
by  substituting  in  Equation  (67)  the  measured  stresses  at  gage  lines  B  and  C.  It  was 
found  that  the  values  of  the  conversion  ratio  obtained  for  the  two  loads  of  25,000 
and  33,300  lb.  are  so  nearly  the  same  that  for  the  range  in  load  between  these  amounts 
the  variation  is  not  important,  and  hence  averages  for  the  two  loads  have  been  used 
in  establishing  values  for  the  conversion  ratios.  As  the  conversion  ratios  found  with 
the  B-19  bars  were  nearly  the  same  for  24-in.  and  36-in.  bars,  it  was  assumed  without 
testing  that  this  similarity  applied  also  to  the  other  forms  having  the  two  lengths. 
As  it  was  found  that  similar  ratios  held  with  the  B-19  section  for  bars  with  full 
bearing  and  controlled  bearing  with  machine  fit,  it  was  assumed  that  these  conditions 
do  not  affect  the  conversion  ratios  in  the  other  sections. 

Values  of  the  conversion  ratio  for  various  conditions  of  the  joint  bars  of  a  given 
kind  ("as  is",  machine  fit,  high  camber,  negative  camber,  etc.,  not  including  worn 
bars  and  bars  simulating  wear)  were  so  nearly  the  same — perhaps  within  two  or  three 
percent  of  an  average  value — that  it  was  thought  best  to  use  average  or  group  values, 
especially  as  the  accuracy  of  readings  did  not  permit  great  refinement. 

Table  7  gives  the  values  of  the  conversion  ratios  found  in  this  way  for  the  various 
forms  and  conditions  of  joint  bars  used  in  the  tests  in  track.  These  conversion  ratios 
are  applicable  to  the  section  at  mid-length  of  bar  and  not  to  other  sections.  The 
magnitude  of  the  bending  moment  developed  in  the  rail  joint  is  then  taken  to  be  the 
product  of  the  given  conversion  ratio  and  the  moment  calculated  by  Equation  (67) 
through  the  substitution  of  the  measured  stresses  in  gage  lines  B  and  C.  This  equation 
takes  into  account  the  position  of  the  neutral  axis  and  any  inclination  from  the 
horizontal  it  may  have. 

It  will  be  noted  that  these  conversion  ratios  range  from  1.00  to  1.67.  For  good  fit 
(both  "as  is"  and  machine  fit)  the  value  is  1.49  for  F-4  and  B-19  bars,  including  full 
bearing  and  controlled  bearing.  On  the  other  hand  it  was  found  that  the  condition  of 
wear  through  the  middle  part  of  the  length  of  the  top  fishing  surface  had  a  marked  effect 
on  the  conversion  ratio.  For  the  F-4  worn  bars  the  conversion  ratio  is  1.23  instead  of 
1.49  found  with  new  F-4  bars.  An  even  more  marked  effect  was  found  with  bars  ground 
to  simulate  a  condition  of  considerable  wear;  the  ratio  was  found  to  be  1.00  with  the 
36-in.  B-19  bars  instead  of  1.49  given  by  the  unused  bars.  This  means  that  the  moments 
calculated  from  the  measured  stresses  at  B  and  C  give  the  full  amount  of  moment  devel- 
oped in  the  bars  with  simulated  wear.  The  same  conversion  ratios  were  assumed  to  be 
applicable  to  the  other  bars  having  simulated  wear  condition. 

It  may  be  remarked  that  the  smallness  of  the  ratios  for  worn  bars  is  due  presum- 
ably to  relief  from  heavy  bearing  pressure  on  the  top  of  the  worn  bars  near  the  rail 
ends  and  its  transfer  to  points  away  from  the  mid-section.  With  the  simulated  wear 
bars,  the  bearing  pressure  is  applied  still  further  away  from  the  rail  end  and  the  con- 


»For  equation  (67)  see  Article  11  "Rail  Joints  and  Their  Action". 


Tests    for    Gage    and    Stress    Relations 


183 


Conversion  Ratios  for  Calculation  of  Bending  Koments  with 
Field  Test  Data 

Ratios  were  determined  for  use  with  stresses  at  gage  lines  B  and  C. 


Joint  Bar 

Condition 

Length  of 
Inches 

Bar 

Conversion 
Ratio 

P.R.R.   F-4 

As  is 

36 

1.49 

Controlled  Bearing 

liachlne  fit 

36 

1.49 

High  camber 

36 

1.49 

Negative  comber 

36 

1.49 

'.'.'orn 

36 

1.23 

Simulated  wear 

36 

1.00 

P.R.R.   F-4 

As  is 

36 

1.49 

Full  Bearing 

machine  fit 

36 

1.49 

Simulated  wear 

36 

1.00 

B  &.  0  B-19 

As  is 

36 

1.49 

Full  Bearing 

Niachine  fit 

24  and 

36 

1.49 

Simulated  wear 

24  and 

36 

1.00 

B  &  0  B-19 

Machine  fit 

24  and 

36 

1.49 

Controlled  Bearing 

N  &  W  A-39 

As  is 

36 

\.67 

Full  Bearing 

C  &  0  B-43 

As  is 

36 

1.41 

Headfree 

version  ratio  approaches  unity.  The  tests  described  in  Article  26,  "Miscellaneous  Experi- 
mental Data"  of  the  Fifth  Progress  Report,  previously  referred  to,  show  clearly  that  the 
distribution  of  longitudinal  stress  over  a  vertical  section  is  quite  different  a  short  dis- 
tance away  from  the  vertical  sections  that  have  the  heavy  vertical  loads  applied  to 
them,  and  that  a  vertical  section  that  is  free  from  nearby  bearing  pressure  gives  a  stress 
distribution  more  nearly  like  that  assumed  in  beam  analysis.  It  may  be  well  to  add  that 
the  load  (bearing  pressure  of  rail  on  bar)  here  referred  to  is  the  force  Q  shown  in  Fig.  21 
which  is  developed  when  the  joint  is  loaded. 

All  the  laboratory  tests  discussed  above  were  made  with  loadings  apphed  vertically 
so  that  the  joint  carried  bending  moments  in  the  vertical  plane  only.  Since  the  stresses 
observed  in  the  track  tests  showed  that  in  some  cases  considerable  lateral  bending 
moment  was  present,  it  was  thought  desirable  to  ascertain  what  effect  this  combined 
bending  would  have  on  the  conversion  ratio.  Accordingly  a  joint  with  B-19  bars  of 
36-in.  length  previously  tested  in  vertical  bending  was  supported  in  a  manner  such  that 
a  ratio  of  lateral  load  to  vertical  load  of  approximately  one  to  four  was  applied  to  the 
joint.  This  test  setup  is  shown  in  Fig.  28.  The  resulting  conversion  ratios  were  found  to 
be  closely  similar  to  the  values  obtained  for  vertical  loading,  so  it  was  judged  that  the 
lateral  load  had  a  negligible  effect  in  this  respect.  The  small  differences  found  were  about 
the  order  of  magnitude  of  the  accuracy  of  the  observations  and  the  conditions  of  the 
setup. 

In  the  laboratory  tests  just  described  measurements  were  made  of  the  deflection  of 
the  joints  in  the  48-in.  span  under  the  given  loads.  As  the  information  thus  incidentally 
found  may  serve  as  an  indication  of  the  relative  stiffness  of  the  various  joints  and  as 
the  stiffness  in  a  way  may  be  some  measure  of  the  ability  of  the  joint  to  distribute  the 
load  along  the  track  as  compared  with  full  rail,  the  results  have  been  shown  graphically 
in  Fig.  29. 


184 


Stresses    in    Railroad    Track 


Fig.  28. — View  of  Test  Setup  Giving 

Combined  Vertical  and  Lateral 

Bending  Load. 


Except  for  the  B-19  "as  is"  full  bearing  bars  the  tests  were  made  with  only  one 
joint  of  a  kind,  and  the  results  may  not  be  fully  representative.  The  F-4  "as  is"  joints 
give  somewhat  larger  deflection  than  the  B-19.  Machine  fit  joints  are  slightly  stiffer  than 
"as  is".  The  "as  is"  head-free  joint  and  the  F-4  worn  joint  have  simDar  deflection.  The 
heavy  angle  bars  (having  tight  bolts  as  have  the  other  joints)  deflect  about  the  same 
as  the  B-19  machine  fit  joint.  The  worn  bars  give  greater  deflection  than  the  "as  is" 

Deflection    in   Inches 
0         0.02      0.04      0.06      0.08 


B-19 

B-19 

B-19 

B-19 

B-19 

r.4 

^-39 

B-19 

r.4 

r-4 

B  43 


As  is 
As  is 

As  is 

Machine  fit\ 
24  in.  bars  } 
Simulated  wear 

As  is 


I  As  is     1 

_j Angle  bars] 

•o  Machine  fit 


///^//f,^/f>^r///^////rr^ 


\t 


As  is 

Worn 
.  t 

Head -free.    As  is 


V/////////////////////A 


VZZZZ227ZZZZZZZZZZZZZA 


•2ZZZZZ2ZZ2ZZZZZZZ22ZZZ2 


Z22ZZZZZZZ. 


///.•'////////////// //.'///^/TT-Ti 


•//,'/.'  •/.'>////.'///>/,'7777\ 


'}/'/j\'/.'^}/A 


•/////,W//A 


V///////>///.'^///>y/^777\ 


'/////,'////////////. 


Fig.  29. — Deflection  of  Rail  Joints  in  Laboratory  Tests — Load 
33,300  lb.  Span  48  in. 


Stresses    in    Rail    Joints   in    Track 185 


joints,  and  the  simulated  wear  joints  have  still  greater  deflection.  It  may  be  added  that 
the  deflection  of  a  full  rail  under  the  same  load  and  span  would  be  about  0.029  in. 

14.  Stresses  in  Rail  Joints  in  Track.— In  the  track  tests  stresses  were  measured 
in  the  inner  and  outer  bars  of  the  joints  at  the  four  positions  shown  in  Fig.  26  of 
Article  12  "The  Joint  Bars  and  the  Test  Schedules".  All  gages  for  measuring  stress  were 
placed  at  mid-length  of  the  joint.  As  can  be  seen  from  the  figure  a  magnetic  strain  gage 
B  was  attached  on  the  top  flange  of  the  bar  (gage  line  B),  and  a  second  strain  gage  C 
on  the  bottom  flange  (gage  line  C).  A  view  of  two  gages  mounted  on  the  outer  bar  of 
a  joint  with  F-4  bars  is  shown  in  Fig.  6  of  Article  7  "Testing  Equipment".  As  the  gaees 
were  offset  laterally  from  the  surface  of  the  bars  the  gage  readings  will  be  different 
from  the  actual  surface  stress  when  there  is  marked  lateral  bending  of  the  joint  or  of 
individual  bars. 

Representative  records  of  the  stresses  in  a  B-19  joint  at  5  and  90  miles  per  hour 
for  gage  lines  C  and  B  of  the  outer  bar  and  B  of  the  inner  bar  may  be  seen  in  Fig.  39, 
designated  as  records  4B,  SB  and  6B,  respectively.  The  stress  at  C  for  the  inner  bar  was 
recorded  by  the  other  oscillograph  and  is  not  shown. 

It  may  be  noted  that  the  stress  records  for  the  runs  at  90  miles  per  hour  show  a 
notch  in  the  peaks  at  most  of  the  wheels.  The  stress  record  at  the  notch  drops  sharply 
and  then  quickly  rises  as  the  wheel  passes  over  the  rail  gap  at  the  mid-length  of  the 
joint  where  the  gages  are  attached.  It  is  judged  that  this  notch  is  caused  by  the  wheel 
passing  over  the  rail  gap.  This  effect  is  generally  present  to  a  lesser  degree  in  the  records 
for  five  miles  per  hour.  The  depth  of  the  notch  was  found  to  be  related  to  the  speed  in 
many  instances. 

Because  of  complicating  conditions,  the  stresses  themselves  cannot  be  readily  inter- 
preted for  the  discussion  of  some  of  the  purposes  of  the  tests.  However,  the  recorded 
stresses  will  be  of  direct  value  for  showing  variations  in  individual  runs  under  compara- 
ble conditions,  for  indicating  the  presence  of  lateral  bending,  and  for  estimating  the 
maximum  stresses  in  the  various  bar  sections.  Representative  data  will  be  shown  for  these 
purposes. 

As  lack  of  space  on  the  bars  for  application  of  all  gages  simultaneously  prevented 
recording  all  the  measurements  taken  on  the  joint  bars  in  one  given  run,  it  was  neces- 
sary to  make  three  sets  of  runs,  changing  the  gages  for  each  set  (5,  60,  and  90  miles  per 
hour,  with  several  runs  at  each  speed)  to  obtain  all  desired  data  at  the  three  joint 
locations.  See  Article  8  "Operation  of  the  Tests  and  Reduction  of  the  Data". 

Representative  sets  of  stresses  (5b  and  sc)  measured  in  three  types  of  joint  bars  are 
given  in  Table  8;  these  tests  were  all  made  at  one  joint  location  with  the  same  spjeds 
of  the  same  locomotive  and  with  similar  bolt  tension.  Stresses  are  given  for  in- 
dividual runs  at  speeds  of  5  to  90  miles  per  hour,  all  for  Location  3.  The  joint  bars  were 
36-in.  in  length,  with  full  bearing  fishing  surface  and  "as  is"  condition.  The  first  set  of 
data  gives  stresses  for  the  B-19  bar,  a  heavy  symmetrical  section.  The  second  set  is  for 
the  A-39  bar,  a  heavy  angle  section.  The  third  set  is  for  the  F-4  bar,  a  symmetrical 
section  of  somewhat  less  cross-sectional  area.  These  three  sections  cover  a  considerable 
range  of  design  in  joint  bars.  The  properties  of  these  bars  may  be  referred  to  in  Table  4 
and  cross  sections  in  Fig.  25.  Also  reference  may  be  made  to  Table  6,  in  Article  12. 
which  gives  a  list  of  the  joints  tested,  the  joint  locations,  conditions  of  the  bars,  and 
other  data  of  the  tests. 

The  stresses  (sb  and  5c)  given  in  Table  8  are  the  values  measured  at  the  two  gage 
positions  on  the  outer  and  the  inner  bar  at  mid-length  as  each  of  the  three  drivers 
passed   the   instruments.  The   moments   given    in   one   column   are   the   vertical   bending 


186 


Stresses   in    Railroad   Track 


Table  8 

Representative  Measured  Stresses  at  Mld-lengtii  of  Joint  Bars 
at  Joint  Location  3 

'  Q  are  the  values  measured  by  the  magnetic  strain  gages  and 
the  estimated  maximum  stress  in  the  bar.  Stresses  are  glv- 


en  in  thousands  of  pounds  per  square  inch, 
thousands  of  Inch  pounds. 


tioments  are  given  in 


Run 

No. 


Speed 

(m.p.h.; 


Driver 
No. 


Mo- 
ment 


B  «c  0  B-19  Joint  Bar,  36  In.,  Full  Bearing,  As  Is 


246 

5 

1 

2 
3 

11.2 
11.2 
10.0 

15.6 
13.5 
12.7 

27.1 
25.6 
23.3 

177 
162 
149 

15.3 

9.6 

11.2 

12.7 
10.3 
13.3 

30.4 
20.8 
25.4 

247 

5 

1 
2 
3 

11.2 

11,0 
10,0 

15.0 
12,9 
12.0 

27.0 
24.7 
22,9 

173 

156 
145 

14.3 

10.4 
10.8 

12.9 
10.1 
11.7 

29.2 
21.9 
23.7 

246 

5 

1 
2 
3 

11.2 
11.2 
10.8 

14,6 
13.1 
12.1 

26.6 
25.1 
23.7 

170 
159 
149 

13.7 
9.8 

12.7 

9.9 

27.9 

20.8 

241 

60 

1 
2 
3 

11.6 
11.2 

10.2 

12.7 
15.6 
11.7 

25.3 
27.4 
22.9 

158 
177 
144 

12.0 
12.6 
10,8 

11.3 
9.4 
9.7 

25.0 
24.4 
21.7 

243 

60 

1 
2 
3 

11.2 
10.6 
11.4 

12,9 
16.0 
12.7 

25.1 
27.2 
25.3 

158 
177 
158 

11,8 
13.5 

10.1 

9.2 

23.4 
25.4 

240 

90 

1 
2 
3 

12.6 
11.4 
10.4 

14.6 
15.6 
10.9 

28.5 
28.0 
22.7 

179 
179 
140 

14.3 
12.4 
11,0 

11.5 

10.1 
9.0 

28.1 
24.6 
21.8 

242 

90 

1 
2 
3 

11,2 
11,0 
10.4 

15.2 
17.0 
12.3 

27.0  . 

28.3 

23.5 

174 
185 
149 

15.7 
14.3 
11.6 

9.4 

10.3 

9.2 

28.7 
27.2 
22.6 

245 

90 

1 
2 
3 

12,4 

10.2 
10.2 

16.6 
16.6 
13.6 

28.5 
27.2 
24.3 

186 
179 
156 

16.3 
13.3 
13.1 

11.9 
9.7 

6.8 

31.3 
25.3 
24.9 

N  &  W  A-29  Joint  Bar,  36  in..  Full  Bearing,  As  Is 


182 
130 
161 

178 

134 
148 

171 

128 


152 
142 
133 

142 
146 


167 
146 
130 

161 
158 
134 

182 

148 

142 


357 

5 

1 
2 
3 

9.0 
8.4 
7.5 

16.4 
14.8 
12.9 

26.6 
24.5 
21.8 

184 
169 

149 

14.9 
11.6 
11.2 

4.9 
4.1 
5.1 

27.2 
21.1 
21.1 

162 
127 
130 

358 

5 

1 
2 
3 

9.0 
8.2 
7.3 

15.8 
14.4 
13.3 

26.1 
24.0 
21.7 

180 
165 

150 

14.5 
11.2 
11.6 

5.3 
4.1 
4.9 

26.8 
20.6 
22.0 

160 
124 

134 

362 

5 

1 
2 
3 

9.7 
6,7 
7.8 

15.8 
14.7 
13.2 

27.3 
24.8 
22.5 

187 
170 
154 

15.3 
12.0 
12.0 

7.9 
5.9 
6.3 

29.5 

23.3 
23.2 

184 
144 
145 

354 

60 

1 
2 
3 

9.6 
8.8 
8.0 

14.6 
15.4 
12.7 

25.8 
25.5 
22.2 

177 
175 
152 

13.1 
13.5 
11.2 

5.3 
3.3 
3.9 

24.4 
23.9 
20.9 

149 
139 
125 

moments  calculated  from  the  strain  gage  records  in  the  manner  described  in  Article  13, 
"Laboratory  Tests  to  Find  Gage  and  Stress  Relations  and  Conversion  Ratios". 

The  estimated  maximum  stress  (imax)  in  a  bar  given  in  the  column  headed  5max  is 
that  found  for  the  remotest  fiber  by  calculation  from  the  given  moment  and  the  stress 
Sc  in  the  lower  flange  on  the  assumption  that  this  stress  is  unaffected  by  bearing  pressure 
and  other  factors  discussed  previously.  The  calculation  indirectly  involves  finding  the 
position  of  the  neutral  axis  and  finally  the  stress  at  the  remotest  point  from  this  neutral 
axis,  usually  a  compressive  stress  at  the  top  part  of  the  bar.   The  calculation  was  ex- 


Stresses   in    Rail    Joints   in    Track 


187 


Talkie  e   (CoDtlDued) 


Speed 
No.  kffl.p.b.) 


Drlrer 
No. 


»B 


-C   "max  JJ^^t 


Ite- 
meat 


N  <L  W  A-39  Joint  Bar,  36  In.,  Full  Bearing,  As  la  (Cont.) 


355 

60 

1 
2 
3 

9.6 
9.2 
8.0 

14.8 
16.6 
14.0 

26.2 
27.2 
23.2 

179 
187 
160 

13.5 
15.3 
12.6 

4.3 
2.9 
4.3 

24.4 

26.5 
22.9 

359 

60 

1 
2 
3 

9.5 
8.7 
7.2 

13.6 
17.0 
12.9 

25.0 
26.6 
21.3 

170 
185 
147 

12.8 
14.3 
12.2 

5.1 
3.9 
3.3 

23.6 
25.5 
21.6 

356 

90 

1 
2 
3 

10.4 
7.8 
8.6 

17.6 
18.6 
12.9 

29.3 
27.2 
23.2 

206 
189 
159 

16.7 
15.9 
11.6 

5.3 
3.3 
5.8 

30.3 
27.7 
22.4 

360 

90 

1 
2 
3 

10.1 
8.4 
8.4 

15.7 
18.3 
12.8 

27.8 
27.8 
22.9 

190 
193 
157 

16.5 
18.0 
13.3 

7.0 
3.7 
5.1 

31.0 
31.2 
24.6 

361 

90 

1 
2 
3 

10.6 
9.5 
8.9 

15.3 
16.2 
13.0 

27.6 
27.3 
23.6 

190 
187 
162 

15.7 
14.9 
13.3 

6.7 
6.0 
5.8 

29.4 
27.9 
25.1 

P.B.R.  7-4  Joint  Bar,  36  In.,  Full  Bearing,  As  la 


143 
152 
137 

144 
150 
127 

180 
159 
139 

189 
180 
149 

180 

169 
154 


88 

5 

1 
2 
3 

13.0 
11.0 
11.5 

15.0 
19.3 
14.0 

28.6 
31.0 
25.9 

133 
146 
121 

12.8 
18.1 
11.8 

16.6 
13.1 

14.2 

29.6 
33.4 
26.5 

139 
146 
124 

89 

5 

1 
2 
3 

13.0 
11.2 
11.2 

15.4 
18.6 
13.8 

28.7 
30.3 
25.5 

134 
143 
119 

.13.0 
12.4 
11.6 

16.3 
13.1 
13.6 

30.0 

26.1 
25.6 

140 
121 
119 

90 

5 

1 
2 
3 

12.8 
10.8 
11.2 

14.6 
18.8 
13.6 

28.1 
30.2 
25.3 

130 
142 
118 

12.8 
13.0 
11.4 

16.3 
12.9 
13.8 

29.7 
26.6 
25.5 

139 
122 
119 

81 

62 

1 
2 
3 

11.6 
12.2 
10.2 

14.6 
21.4 

14.4 

26.8 
34.1 
25.0 

125 
161 
118 

12.4 
16.3 
14.7 

13.8 
12.2 
11.3 

26.8 
30.0 
27.8 

124 
134 
124 

82 

61 

1 
2 
3 

13.2 
12.2 
11.2 

15.6 
20.0 
14.6 

29.3 
32.4 
26.6 

137 
153 
124 

13.8 
15.2 
13.2 

14.6 
12.1 
11.7 

29.0 
29.1 
26.1 

134 
130 
118 

83 

61 

1 
2 
3 

12.2 
12.2 
10.4 

14.6 
20.0 
14.6 

27.6 
32.4 
25.2 

128 
153 
119 

11.4 

15.2 
13.0 

13.6 
12.7 
11.7 

25.5 
29.7 
2t).5 

119 
133 

110 

78 

90 

1 
2 
3 

15.7 
13.3 
11.2 

21.8 
22.5 
15.6 

38.0 
36.3 
27.1 

179 
171 
128 

18.8 
17.5 
15.3 

17.3 
13.6 
12.4 

37.6 
32.4 

29.3 

171 
146 
131 

79 

89 

1 
2 
3 

13.5 
13.3 
11.0 

19.1 
23.5 
17.0 

32.9 
37.3 
28.4 

155 

176 
134 

17.3 
18.4 
15.5 

15.3 
14.6 
12.0 

34.3 
35.2 
29.1 

156 
157 
130 

80 

90 

1 

2 
3 

15.3 
12.4 
11.6 

21.8 
22.5 
16.4 

37.5 
36.4 
28.4 

177 
167 
134 

19.4 
17.7 
16.3 

16.8 
13.1 
12.6 

37.8 
32.6 
^0.7 

171 
145 
137 

pedited  by  the  use  of  graphical  methods.  These  estimated  maximum  stresses,  while  not 
exact  values,  may  be  expected  to  approximate  the  actual  values. 

A  comparison  of  the  measured  stresses  in  the  several  joints  may  well  be  made  for  a 
given  driver  and  location  to  determine  how  closely  one  run  checks  another  at  the  same 
speed.  It  is  important  that  variations  should  be  small  in  any  three  sets  of  runs  making 
up  the  data  on  a  given  joint.  For  this  purpose  compare  the  stresses  (.vh  or  sc)  in  Table  8 
for  different  runs  at  a  given  speed  and  joint  location.  As  an  example,  in  the  first  group 


1 SS  Stresses    in    Railroad    Track 

of  data,  the  joint  with  B-19  bars,  the  stresses  sb  on  the  outer  bar  at  joint  Location  3 
for  a  speed  of  5  miles  per  hour  are  11,200,  11,200  and  11,200  lb.  per  sq.  in.  for  runs  246, 
247,  and  248,  respectively.  Even  at  90  miles  per  hour  the  stresses  for  three  runs  are  in 
close  agreement,  being  12,600,  11,200  and  12,400  lb.  per  sq.  in.  for  runs  240,  242,  and 
245,  respectively.  The  maximum  variation  from  the  average  for  these  three  stresses  is  900 
lb.  per  sq.  in.,  which  is  representative  of  the  larger  variations  to  be  found  in  the  rest  of 
the  data.  The  stress  sc  and  those  in  the  two  gage  lines  of  the  inner  bar  have  similar 
agreement  in  the  three  runs.  Few  stresses  for  the  several  runs  at  a  given  speed  vary 
more  than  1,000  lb.  per  sq.  in.  from  the  average  value  for  comparable  conditions,  and 
most  of  them  have  less  variation.  In  this  connection  it  may  be  stated  that  the  limiting 
accuracy  set  in  the  reduction  of  data  from  the  records  was  ±500  lb.  per  sq.  in.  It  ap- 
pears then  that  the  agreement  between  individual  runs  for  comparable  conditions  is  good 
for  most  cases,  especially  considering  the  limits  of  accuracy  in  other  respects.  The  assump- 
tion that  the  repetition  of  the  runs  three  times  will  give  comparable  data  for  the  purpose 
is  justified  within  reasonable  limits. 

The  magnitude  of  the  calculated  maximum  stresses  (smax)  can,  be  studied  in  this 
table  as  related  to  the  type  of  bar.  The  values  of  the  stresses  at  a  speed  of  five  miles  per 
hour  are  best  suited  for  comparison  because  of  the  lesser  variability  in  the  action  of  the 
locomotive  at  this  speed.  In  comparing  the  stresses,  consideration  must  also  be  given  to 
the  bending  moment  developed  in  the  joint,  which  always  depends  on  the  individual 
characteristics  of  the  joint.  It  may  be  noted  in  the  table  that  in  general  the  bending 
moment  developed  is  somewhat  less  for  the  F-4  bar  than  for  the  B-19  or  the  A-39  bar. 
The  sections  named  are  in  order  the  lighter  symmetrical  bar,  the  heavy  symmetrical  bar, 
and  the  heavy  angle  bar.  The  B-19  and  the  A-39  bars  generally  developed  moments  of 
approximately  the  same  magnitude. 

Bearing  in  mind  what  has  been  said  in  regard  to  the  relative  bending  moments 
developed  in  the  three  joints,  the  estimated  maximum  stresses  (5max)  may  be  compared. 
The  maximum  stresses  for  the  B-19  and  A-39  bars  from  Table  8  with  few  exceptions  are 
below  30,000  lb.  per  sq.  in.  and  are  usually  about  25,000  lb.  per  sq.  in.,  whereas  in  many 
cases  the  maximum  stresses  in  the  F-4  bar  are  30,000  lb.  per  sq.  in.  or  greater,  even 
though  the  moments  in  the  F-4  bars  are  generally  less  than  in  the  other  two  types. 
Three  runs  where  the  moments  happen  to  be  the  same  (179,000  in. -lb.)  in  the  outer 
bar  for  driving  wheel  No.  1  may  be  cited  for  comparison.  The  B-19  bar  had  a  maximum 
stress  of  28,500  lb.  per  sq.  in.  (run  240),  the  A-39  bar  a  stress  of  26,200  lb.  per  sq.  in. 
(run  355),  and  the  F-4  bar  a  stress  of  38,000  lb.  per  sq.  in.  (run  78).  The  stress  in  the 
lighter  bar  is  thus  seen  to  be  more  than  10,000  lb.  per  sq.  in.  higher  than  the  stress  in 
the  other  two  bars  for  an  identical  moment. 

The  stresses  in  Table  8  wDl  also  give  some  indication  of  the  presence  of  lateral 
bending  in  the  joint.  The  stresses  at  corresponding  gage  locations  on  the  outer  and 
inner  bars  may  be  compared  for  this  purpose.  If  there  is  general  lateral  bending  of  the 
joint,  the  stress  for  one  bar  will  be  high  and  the  corresponding  stress  for  the  other  bar 
low.  The  relation  of  the  magnitudes  of  stresses  in  the  outer  and  the  inner  bars  at  their 
top  will  be  the  opposite  of  that  at  their  bottom.  The  stresses  for  driving  wheel  No.  1, 
run  245,  at  90  miles  per  hour  may  be  taken  as  an  example  to  illustrate  the  presence  of 
lateral  bending.  The  stress  Sb  for  the  outer  bar  is  12,400  lb.  per  sq.  in.  and  for  the  inner 
bar  16,300  lb.  per  sq.  in.  while  Sc  for  the  outer  bar  is  16,600  lb.  per  sq.  in.  and  for  the 
inner  bar  11,900  lb.  per  sq.  in.  Thus  for  the  outer  bar  the  lateral  bending  has  decreased 
the  compressive  stress  at  sb  due  to  vertical  bending  and  increased  the  tensile  stress  at 
sv.  This  would  indicate  lateral  bending  of  such  nature  as  to  produce  tension  in  the  outer 


Values    of    Moments    of    Rail    Joints    in    Track 1^ 

bar  or  an  outward  bending  with  respect  to  the  joint.  An  opposite  relation  of  the  stresses 
in  the  inner  bar  also  indicates  a  general  outward  bending  of  the  joint. 

For  the  lower  speeds  the  stresses  in  corresponding  gage  lines  in  the  outer  and  the 
inner  bar  are  seen  to  be  quite  similar  in  magnitude  for  both  the  F-4  and  the  B-19 
joints;  for  the  higher  speeds  they  become  dissimilar  indicating  the  presence  of  lateral 
bending  due  doubtless  to  lateral  forces  developed  by  the  locomotive.  The  A-39  angle  bar 
joint  shows  considerable  dissimilarity  in  stresses  at  corresponding  gage  lines  on  outer 
and  inner  bars  for  all  speeds.  The  stress  sa  for  the  angle  bar  at  the  gage  location  at  the 
edge  of  the  projecting  lower  flange  would  be  more  affected  by  lateral  bending  than  would 
the  symmetrical  bar. 

It  is  seen  then  that  the  data  of  Table  8  show  relatively  small  variations  in  the 
stresses  in  any  bar  from  run  to  run  for  a  given  wheel  at  a  given  speed  and  location. 
The  presence  of  general  lateral  bending  of  the  joint  is  indicated  in  some  cases,  and  this 
lateral  bending  is  generally  greater  for  the  higher  speeds.  Appreciably  larger  stresses  were 
found  in  the  lighter  section,  F-4  bars,  than  in  the  B-19  or  A-39  bars. 

Because  of  the  great  amount  of  data  obtained,  it  is  not  feasible  to  publish  even  a 
table  of  the  average  stresses  for  all  the  tests. 

15.  Values  of  Moments  in  Rail  Joints  in  Track. — Many  of  the  comparisons 
to  be  made  from  the  data  of  the  tests  can  best  be  taken  from  the  values  of  the  vertical 
bending  moments  developed  at  mid-length  of  the  joint  as  calculated  from  the  measured 
stresses  in  the  bars  with  the  aid  of  the  conversion  ratios.  Because  of  variations  in  de- 
sign of  bar,  the  position  of  gage  lines,  the  action  of  the  locomotive  laterally,  and  the 
opportunity  for  averaging  runs,  bending  moments  have  been  found  most  satisfactory  for 
the  purpose  of  comparing  the  various  types  of  joint  bars  and  their  effectiveness  in 
approaching  continuity  in  rail. 

As  a  first  step  in  the  determination  of  the  vertical  bending  moment  developed  at 
mid-length  of  a  joint,  the  measured  stresses  were  substituted  in  Equation  (67)  (sec 
Article  11).  As  various  deformations  of  the  bars  due  to  forces  other  than  the  forces 
assumed  in  ordinary  beam  analysis  introduce  variations  from  the  assumptions  of  the 
analysis  it  is  necessary  to  multiply  the  result  by  the  conversion  ratio  established  for  the 
given  type  and  condition  of  bar,  as  described  in  Article  13  "Laboratory  Tests  to  Find 
Gage  and  Stress  Relations  and  Conversion  Ratios".  Equation  (67)  takes  into  account 
any  inclination  of  the  neutral  axis  from  the  horizontal.  As  may  be  seen  in  Fig.  26  the 
magnetic  strain  gages  at  gage  lines  B  and  C  were  offset  from  the  surface  of  the  bars. 
The  effective  amount  of  this  offset  has  been  found  to  be  0.45  in.  This  value  has  been 
used  in  determining  the  coordinates  of  the  positions  of  the  gage  lines  for  the  calculation 
of  the  moment  from  the  measured  stresses,  Sb  and  Sc,  which  correspond  to  St  and  Si  of 
Equation  (67).  It  is  believed  that  the  method  here  used  in  reducing  the  data  of  the 
tests  obtains  values  for  the  vertical  bending  moments  with  a  reasonable  degree  of 
accuracy. 

In  Table  9  are  given  the  values  of  the  vertical  bending  moment  in  the  joint  bars 
at  mid-length  for  the  three  joint  locations  and  the  several  types  and  conditions  of  the 
bars  as  the  three  driving  wheels  passed  the  joint  at  speeds  from  5  to  90  miles  per  hour. 
Each  value  is  the  average  of  three  or  more  runs. 

Reference  may  be  made  to  Table  6,  which  lists  the  bar  sections,  length  of  the  bars, 
condition  of  the  bars,  type  of  bearing,  speeds  used  and  other  information  for  all  the 
rail  joints  tested.  This  table  will  give  a  good  understanding  of  the  sco|)e  and  variety 
of  the  tests. 


190 


Stresses    in    Railroad    Track 


Table  9 

Vertical  Bending  Moments  at  Mid-length  of  Rail  Joints 

Moments  are  given  in  thousands  of  inch  pounds.  In  the  calculation  of 
moments  from  the  measured  stresses  the  conversion  ratios  were  used. 


Speed 


Loca- 
tion 


Driver  No. 


Speed 


Loca- 
tion 


P.R.R. 

F-4,  36  in., 

Controlled  Bearing 

,  A3  Is 

1 

251 

293 

289 

278 

60 

1 

246 

297 

264 

2 

290 

280 

345 

305 

2 

267 

269 

321 

At. 

271 

287 

317 

292 

At. 

257 

283 

293 

1 

243 

288 

279 

270 

90 

1 

251 

196 

172 

2 

252 

260 

336 

283 

2 

205 

248 

357 

At. 

248 

274 

308 

277 

At. 

228 

222 

265 

269 
266 
278 

206 
370 
238 


1 

286 

278 

269 

278 

60 

1 

320 

289 

279 

2 

223 

241 

239 

234 

2 

180 

244 

250 

At. 

255 

260 

254 

256 

At. 

250 

267 

265 

1 

321 

265 

289 

292 

90 

1 

314 

256 

169 

2 

172 

267 

261 

233 

2 

145 

231 

301 

At. 

247 

266 

275 

263 

At. 

230 

244 

235 

F-4,  36  in.,  Controlled  Bearing,  Simulated  Wear 
I  155  I   157  I  164  I   60  I  1     1150   I  147   I  136 
I       I        I       I   90  I  1     1 133   I  108   I   63 
P.R.R.   F-4,  36  in..  Controlled  Bearing,  Worn 


1 

342 

.  . . 

... 

60 

1 

. . . 

340 

2 

247 

246 

249 

247 

2 

254 

270 

276 

3 

280 

282 

.  •  . 

3 

300 

302 

279 

At. 

263 

290 

90 

At. 

1 
2 
3 
At. 

277 

247 
262 
255 

286 

206 
277 
242 

298 

280 
268 
283 
277 

P.R. 

R.   F-4 

,  36  in 

. ,  Controlled 

Bearing,  High  Camb 

er 

2 
3 
At. 

359 
389 

374 

368 
376 
372 

402 
366 
384 

376 
377 
377 

60 

2 
3 
At. 

369 
409 
389 

365 
388 
387 

400 
338 
369 

90 

2 
3 
At, 

273 
463 
368 

359 
425 
392 

■iio 

296 
225 
261 

246 
226 
236 


144 
101 


267 
294 
281 


240 
274 
257 


385 
378 
382 


P.R.R.  F-4,  36  in,,  Controlled  Bearing,  High  Camber 


5 

2 

234 

255 

292 

263 

60 

2 

247 

281 

286 

271 

3 

345 

336 

370 

350 

3 

354 

357 

370 

360 

At. 

290 

296 

331 

307 

At. 

300 

319 

328 

316 

5* 

2 

188 

196 

230 

205 

60* 

2 

181 

201 

218 

200 

3 

197 

200 

264 

220 

3 

228 

213 

241 

228 

At. 

193 

198 

247 

213 

At. 

205 

207 

230 

214 

90* 

2 

3 
At. 

137 
208 
173 

151 
228 
190 

240 
268 
254 

176 
235 
206 

Shims  inserted  between  rail  and  tie-plate. 


Values    of   Moments   of    Rail   Joints    in    Track 


IQl 


Table  9  (Continued) 


Speed 


Loca- 
tion 


Driver  No, 


Speed 


Loca- 
tion 


P.R.R.  F-4,  36  in.,  Controlled  Bearing,  Negative  Camber 


2 
3 
Av. 

175 
148 
162 

203 
137 
170 

229 
130 
180 

202 
138 
170 

60 

2  , 
3 

AT. 

185 
161 
173 

212 
167 
190 

240 
160 
200 

90 

2 
3 

135 

198 

269 

P.R.R.  F-4,  36  in.,  Full  Bearing,  A3  Is 


1 

269 

275 

293 

279 

60 

1 

233 

296 

234 

2 

297 

294 

357 

315 

2 

298 

304 

336 

3 

242 

272 

275 

263 

3 

240 

290 

256 

Av. 

269 

280 

308 

286 

Av. 

257 

297 

275 

1 

230 

275 

299 

268 

VO 

1 

237 

200 

160 

2 

237 

289 

345 

290 

2 

232 

257 

347 

3 

225 

275 

294 

265 

3 

266 

321 

339 

At. 

231 

280 

313 

274 

Av. 

245 

259 

282 

P.R.R.  F-4,  36  in.,  Full  Bearing,  Machine  Fit 


1 

275 

296 

328 

300 

60 

1 

250 

314 

302 

2 

249 

245 

283 

259 

2 

248 

261 

279 

3 

227 

238 

298 

254 

3 

245 

268 

266 

Av. 

250 

260 

303 

271 

Av. 

248 

281 

282 

1 

255 

272 

308 

278 

90 

1 

276 

232 

232 

2 

221 

220 

308 

250 

2 

171 

186 

289 

3 

223 

244 

281 

249 

3 

241 

285 

306 

Av. 

233 

245 

299 

259 

Av. 

229 

234 

276 

P.R.R.  F-4,  36  in..  Full  Bearing,  Simulated  Wear 


1 

201 

203 

226 

212 

60 

1 

162 

200 

201 

2 

165 

182 

195 

181 

2 

144 

163 

181 

3 

157 

163 

189 

170 

3 

144 

156 

161 

Av. 

174 

184 

203 

188 

Av. 

150 

173 

181 

90 

1 
2 
3 
Av. 

173 
107 
125 
135 

159 
116 
151 
142 

142 

176 
174 
164 

B  &;  0  B-19,  36  in..  Full  Bearing,  As  Is 


1 

339 

368 

395 

367 

60 

1 

294 

383 

368 

2 

302 

321 

365 

329 

2 

286 

322 

357 

3 

300 

292 

351 

314 

3 

285 

323 

306 

At. 

314 

327 

370 

337 

AV. 

288 

343 

344 

90 

1 
2 
3 
Av. 

350 
234 
285 

290 

298 
255 
334 
296 

274 
404 
350 
342 

212 
163 
188 


254 
313 
262 
276 

199 
249 
309 
262 


289 
263 
260 
271 

247 
215 
277 
246 


188 
163 
154 
168 

158 
133 
150 
147 


348 
322 
305 
325 

307 
296 
323 
309 


B  jc  0  B-19,  36  In.,  Full  Bearing,  Machine  Fit 


5 

I 

305 

308 

351 

321 

60 

1 

265 

327 

326 

306 

2 

231 

248 

303 

261 

2 

216 

250 

297 

254 

3 

228 

242 

300 

258 

3 

242 

274 

275 

264 

Av. 

25b 

266 

318 

280 

At. 

241 

284 

29» 

275 

40 

1 

270 

273 

362 

302 

90 

1 

294 

251 

248 

264 

2 

219 

223 

315 

252 

2 

187 

183 

291 

220 

3 

223 

244 

303 

257 

3 

217 

297 

341 

285 

Av. 

237 

247 

327 

270 

Av. 

233 

244 

293 

257 

192 


Stresses    in    Railroad    Track 


Table  9  (Continued) 


Speed 


loca- 
tion 


Drlyer  No. 


Speed 


Loca- 
tion 


Driver  No. 


B  &  0  B-19,  24  In.,  Full  Bearing,  MaoUlne  Fit 


1 

184 

190 

215 

196 

60 

1 

169 

217 

205 

2 

151 

160 

190 

167 

2 

157 

173 

205 

3 

162 

166 

188 

172 

3 

238 

266 

256 

At. 

166 

172 

198 

178 

At. 

188 

219 

222 

■  90 

1 
2 
3 
At. 

199 
139 
255 
198 

171 
131 
315 
206 

140 
200 
311 
217 

B  &  0  B-19,  36  In.,  Full  Bearing,  Simulated  Wear 


1 

2 
At. 

245 
168 
207 

241 
191 
216 

269 
225 
247 

252 
195 
223 

60 

1 
2 
At. 

200 
151 
176 

242 
166 
204 

248 
191 
220 

90 

1 
2 
At. 

220 
126 
173 

194 
112 
153 

145 
185 
165 

B  t  0  B-19,  24  in..  Full  Bearing,  Simulated  Wear 
3     1154  I  145  I   169  I  156  I  60  I  3     1150  I  171 
I     I       I       1       I  90  I  3     |l50  I  174 
B  &  0  B-19,  35  in..  Controlled  Bearing,  Uachine  Fit 


1230 


232 


263 


242 


60 
90 


1211 


233 
227 


170 
190 


245 
204 


197 
178 
253 
209 

170 
157 
294 
207 


230 
169 
200 

'186 
141 
164 


164 
X71 


B  &  0  B-19,  24  in..  Controlled  Bearing,  Machine  Fit 
I    1191 


181 

169 

180 

60 
90 

1 
1 

208 

187 

172 

N  &,  W  A-39,  36  in.,  Full  Bearing,  As  Is 


2 

293 

304 

338 

312 

60 

2 

300 

317 

372 

3 

286 

300 

351 

312 

3 

284 

329 

320 

At. 

290 

302 

345 

312 

At. 

292 

323 

346 

90 

2 
3 
At. 

238 
306 
272 

257 
356 
307 

366 
378 
372 

330 
311 
321 

287 
347 
317 


C  &  0  B-43,  36  in.,  Headfree,  As  la 


5 

3 

254 

255 

262 

264 

60 

3 

248 

273 

266 

262 

3 

220 

206 

207 

211 

3 

244 

225 

220 

230 

40 

3 

238 

248 

290 

259 

90 

3 

284 

328 

316 

309 

3 

220 

232 

237 

230 

3 

302 

266 

257 

275 

16.  Effect  of  Camber  in  Joint  with  No  Re-tamping.— As  the  track  was  not 
touched  during  the  time  of  the  tests  except  to  insert  five  new  rails  just  before  the  test 
and  as  the  condition  of  the  tie  support  was  not  changed  from  test  to  test  (no  re- 
tamping),  it  is  apparent  that  a  rail  joint  will  have  different  relations  to  the  tie  support 
according  to  the  relative  straightness  of  the  bar  and  to  the  fit  between  bar  and  rail  given 
by  the  several  types  of  bar  used  or  even  by  different  bars  of  the  same  type.  One  indi- 
cation of  such  differences  of  tie  support  is  the  camber  or  lack  of  camber  of  the  rail 
joint  itself  as  related  to  the  level  of  the  tie  plate  and  ties  immediately  under  it.  If  the 
two  rails  at  the  joint  have  no  camber,  as  compared  with  the  original  position  of  the 
supporting  surfaces,  there  will  be  what  may  be  termed  a  normal  distribution  of  load 


Effect    of    Camber    in    Joint  1^.^ 

among  the  ties  at  and  near  the  joint.  If  there  is  negative  camber  in  the  rail  joint  as  com- 
pared with  the  original  position  of  the  supports  these  ties  will  take  more  than  their  nor- 
mal share  of  load  and  the  bending  moment  developed  in  the  joint  will  be  less  than  what 
may  be  considered  normal.  If  there  is  positive  camber,  these  ties  will  take  less  than  their 
normal  load  and  the  bending  moment  in  the  joint  will  be  greater  than  the  normal  amount. 
All  of  this  must  be  taken  with  relation  to  an  original  normal  or  level  position  of  the  tie 
support.  Although  the  magnitude  of  the  camber  appears  small,  with  the  stiff  rail  the 
effect  on  the  support  given  by  the  ties  runs  back  several  tie  spaces  each  way  from  the 
joint.  Obviously,  too,  if  joints  with  high  camber  had  been  tamped  to  give  uniform  sup- 
porting conditions  from  tie  to  tie,  this  condition  of  camber  or  no  camber  may  not  be 
expected  to  affect  the  magnitude  of  the  bending  moment  developed  in  the  joint — at  least 
not  until  traffic  has  acted  to  change  the  supporting  conditions.  Because  of  the  variation 
in  supporting  conditions  in  the  tests  when  different  sets  of  bars  are  inserted  at  a  given 
joint  location  without  re-tamping,  it  is  deemed  advisable  here  to  discuss  some  of  the 
data  relating  to  amount  of  camber  of  a  joint  and  magnitude  of  bending  moment  de- 
veloped in  the  belief  that  this  will  help  to  avoid  misinterpretation  of  data  in  the  further 
discussion  of  the  tests. 

The  rail  joint  camber  used  was  the  average  measured  ordinate  of  the  unloaded  joint 
at  the  rail  surface  at  points  4  in.  each  way  from  the  rail  ends  on  a  chord  of  32  in.  The 
ordinates  were  taken  from  the  plotted  profile  of  the  rail  surface.  In  effect  the  chord  used 
ended  in  the  rail  surface  16  in.  each  way  from  the  rail  gap.  In  Fig.  30  the  measured 
vertical  bending  moment  developed  in  the  joint  at  five  miles  per  hour  is  plotted  against 
the  measured  camber.  As  little  distinctive  difference  was  found  in  different  types  of  bars 
the  points  in  the  figure  are  plotted  with  respect  to  condition  of  bar  rather  than  type. 
Each  point  is  the  average  of  the  moments  developed  in  two  joint  bars  by  the  three  driv- 
ing wheels  on  one  rail  for  three  runs  or  more.  Four  principal  conditions  of  bar  are  given, 
"as  is",  machine  fit,  worn  bar  and  simulated  wear.  The  data  include  the  results  from  the 
three  joint  locations.  A  given  pair  of  bars  was  tested  at  one  given  joint  location  only, 
and  other  joints  of  the  same  kind  were  tested  at  the  other  joint  locations,  except  that 
both  pairs  of  B-43  head-free  bars  were  tested  at  joint  Location  3.  The  vertical  spread  of 
the  points  is  due  to  differences  in  tie  support  at  the  three  joint  locations  and  to  other 
variable  conditions.  In  general,  as  would  be  expected  with  joints  not  re-tamped,  there  v, 
a  definite  trend  for  the  amount  of  the  camber  to  govern  the  magnitude  of  the  bending 
moment  developed. 

The  camber  of  the  joint  in  general  corresponds  to  the  camber  of  the  bars.  The 
machining  of  the  machine  fit  bars  produced  a  bar  with  straight  fishing  surfaces,  which  in 
turn  gave  appro.ximately  a  straight  rail  surface  in  the  joints,  as  is  seen  by  the  grouping 
of  the  machine  fit  joints  near  the  line  of  zero  camber.  The  joints  with  "as  is"  bars  are 
mainly  grouped  around  a  line  for  camber  of  -fO.OlO  in.  It  was  found  that  joints  pro- 
vided with  bars  selected  as  having  high  camber  and  having  a  joint  camber  of  around 
-}-0.030  in.  developed  high  bending  moments  even  though  the  bars  were  the  lighter  F-4 
section.  Two  joints  with  bars  of  the  same  F-4  section  selected  as  having  large  negative 
camber  developed  low  bending  moments.  The  joints  with  bars  ground  to  simulate  wear 
fall  in  the  negative  camber  class  and  developed  a  relatively  low  bending  moment  and 
obviously  placed  a  relatively  larger  bearing  load  on  the  joint  ties.  To  show  this  effect  in 
another  way,  shims  0.15  and  0.20  in.  thick  were  placed  on  the  two  joint  ties  at  joint 
Location  2,  and  shims  0.09  and  0.12  in.  thick  at  joint  Location  3,  using  the  F-4  high 
camber  bars.  For  the  ties  adjoining  the  two  joint  ties  there  would  be  little  or  no  bearing 
until  the  joint  ties  had  been  depressed  somewhat.  The  insertion  of  the  shims  decreased 
the  moment  developed  in  the  joints  with  high  camber  bars  from  an  average  of  310,000 


194 


Stresses   in    Railroad   Track 


400 


300 


5  200 


100 


0 


O   As    IS                                        •    Machine'    fit                              A  High    camber 
,                                                        1        .                                                       bars  ,   shfms 

-o-  Hiah    camber                         -f-    Simulated     wear 
'                                                                                                                       under    rail 

Xi  Negative     comber                 X    Worn                                         U  Head-free ,  As  is 

• 

rft+ 

D 

D 

A 

A 

+ 

-0.03       -0.02        -0.01  0  0.01  0.02  0.03 

Vertical    Camber  of    Joint   in  Indies 


0.04 


Fig.  30. — Relation  between  Joint  Camber  and  Bending  Moment  Developed 

in  Rail  Joints  under  Drivers  of  Locomotive  at  Speed  of 

5  Miles  per  Hour. 

in.-lb.  to  220,000  in.-lb.  With  the  shims  present,  it  is  evident  that  bearing  load  on  the 
ties  at  the  joint  will  be  greatly  increased  and  that  such  ties  cannot  maintain  their  original 
level. 

In  Fig.  30  the  general  scope  of  the  joint  camber  ranges  from  +0.009  to  +0.014  in. 
for  the  group  of  "as  is"  bars  of  the  different  types,  from  ^0.004  to  +0.004  in.  for  the 
group  of  machine  fit  bars,  and  from  — 0.006  to  — 0.012  in.  for  the  simulated  wear  bars. 
The  camber  of  the  joints  with  high  camber  bars  ranged  from  +0.022  to  nearly  +0.040 
in.  That  small  changes  in  camber  should  change  the  magnitude  of  the  moment  developed 
in  the  joint  so  much  when  ties  are  not  re-tamped  may  seem  strange.  However,  the  de- 
flection at  the  middle  of  a  32-in.  simple  span  of  131-lb.  rail  loaded  with  a  single  wheel  load 
of  40,000  lb.  is  about  0.010  in.,  with  a  corresponding  bending  moment  of  320,000  in.-lb. 
Although  the  arrangement  of  the  tie  supports  is  much  more  complicated  than  the  simple 
beam  span,  the  smallness  of  this  rail  deflection  shows  that  small  changes  may  make 
marked  differences. 

Altogether  the  tests  show  that  changes  in  joint  camber  without  re-tamping  of  ties 
modifies  the  load  carried  by  the  ties  at  the  joint  and  affects  the  magnitude  of  the  moment 
developed  in  the  joint  bars  and  that  this  effect  must  be  considered  in  the  interpretation 
of  the  tests.  Again,  it  should  be  noted  that  this  discussion  refers  to  joints  with  bars 
having  varying  camber  inserted  in  track  without  re-tamping  to  make  the  surface  posi- 
tion of  the  ties  fit  the  camber  of  the  joints.  The  results  should  not  be  taken  to  deter- 
mine whether  joints  should  or  should  not  be  made  with  camber  and  tamped  to  make 
the  bearing  on  the  ties  fit  the  conditions  of  joint  camber. 

17,  Discussion  of  Type  and  Condition  of  Bar. — In  order  to  facilitate  a  com- 
parison of  the  bending  moments  developed  in  the  several  types  of  bar  in  their  several 
conditions  of  fit  and  camber  in  detail,  the  values  of  the  bending  moments  taken  from 


I 


Tvpe    and    Condition    of    Bar 


195 


Bearing     Bars 


-•'Full  Bearing    Bars-- 


Fig.  31. 


-Bending  Moments  in  F-4  Rail  Joints  for  Several  Conditions 
of  Fit  and  Camber  at  Speed  of  S  Miles  per  Hour. 


Table  9  have  been  plotted  in  Figs.  31  and  32.  The  figures  give  the  bending  moment  in 
the  joint  at  the  three  joint  locations  for  each  driving  wheel  at  a  speed  of  five  miles  per 
hour.  Values  are  plotted  for  the  several  conditions  of  bar  ("as  is",  machine  fit,  simu- 
lated wear,  etc.).  Each  point  is  the  average  of  values  obtained  from  three  or  more  runs 
at  five  miles  per  hour.  These  values  then  show  the  variation  in  the  moments  developed 
under  the  individual  driving  wheels  as  well  as  the  variation  in  the  three  joint  locations. 
Joint  locations  1  and  3  were  on  the  right  rail,  and  2  was  on  the  left  rail.  As  was  shown 
in  Fig.  3  the  weighed  loads  on  the  several  drivers  varied  considerably.  The  weight  on  the 
right  driving  wheels  was  considerably  greater  than  that  on  the  left  driving  wheels  when 
the  engine  was  weighed,  but  it  may  be  pointed  out  in  advance  that  thk  relation  appar- 
ently does  not  always  hold  in  the  tests.  The  plotted  points  for  the  moments  for  the 
several  wheels  in  some  instances  are  closely  grouped  (similar  values  of  bending  moment) 
and  in  others  the  moments  differ  by  considerable  amounts. 

Fig.  31  gives  the  bending  moments  for  the  36-in.  P.R.R.  F-4  bars  with  controlled 
bearing  and  full  bearing  for  the  several  conditions  of  the  bars.  Points  for  joints  having 
bars  in  a  given  condition  for  a  given  test  are  plotted  on  the  same  vertical  line.  Begin- 
ning at  the  left  vertical   line   (a)    moments   for  controlled   bearing  F-4   bars  in   "as  is" 


196 


Stresses    in    Railroad    Track 


I    -9 


CQ    -J 


400^ 
350\ 
300 
250 

1'""" 

+    /s' 

n,;„ar 

1 

X  ^nrf     Driver 

l^. 

200 

150 

400 

350 
•> 
300\ 

1 

- 





c 

-  ..    -f- 

H 
--> 

- 



250 
200 
150 
400 

o 

>             H 

■ 





300, 

250 

200 

1  f^n 

p 

C 

> 

H 

> 

< 

\ 

^ 

:x-_-^. 

' 

52 
=1 

.C 
-C 
(J 

i 

Full  B 

X) 

"5 

6 

earing  - 
B-19    B 

H 

ars 

■2  -^ 
1 

Confrolled- 

'F 
'A- 

o 

7//    - 

39- 

-  H 

2               ■- 

0                          0 

I          ^ 

ead-Fret 
B-43    - 

1 

Fig.  32. — Bending  Moments  in  Several  Types  and  Conditions 
of  Rail  Joints  at  Speed  of  S  Miles  per  Hour. 


condition  at  joint  location  1  and  2  are  shown.  It  is  seen  that  the  moment  at  joint  Loca- 
tion 2  under  the  first  driver  is  greater  by  more  than  50,000  in.-lb.  than  that  under  the 
second  and  third  drivers.  The  average  for  three  wheels  is  280,000  in.-lb.  for  joint  Loca- 
tion 1  and  305,000  in.-lb.  for  joint  Location  2.  Substitution  of  machine  fit  bars  in  the 
same  joint  locations  (line  b)  gives  a  moment  of  similar  magnitude  in  joint  Location  1, 
but  the  moment  at  joint  Location  2  becomes  235,000  in.-lb.  As  the  camber  of  the  two 
joints  at  joint  Location  1  was  almost  identical  in  the  two  cases,  while  the  camber  at 
joint  Location  2  changed  from  -|-0.013  in.  for  the  "as  is"  bars  to  — 0.003  in.  for  the 
machine  fit  bars,  the  cause  of  the  lower  moment  is  doubtless  due  to  differences  in  cam- 
ber, which  for  joints  not  re-tamped  has  been  shown  to  modify  the  magnitude  of  the 
moment  developed  in  a  given  joint  location. 

The  simulated  wear  bars  (ground  from  machine  fit  with  0.05  in.  of  metal  cut  from 
the  top  fishing  surface  at  mid-length,  tapering  4  and  6  in.  each  way)  gave  a  joint  cam- 
ber of  — 0.012  in.,  which  of  itself  would  decrease  the  moment  developable  in  the  bars. 
The  moment  with  the  simulated  wear  bars  (line  c)  at  joint  Location  1  averaged  165,000 


Type    and    Condition    of    B  a  i 197 

in.-lb.,  in  place  of  280,000  in. -lb.  developed  with  the  original  machine  fit  bars.  The 
smaller  moment  in  the  joints  with  simulated  wear  bars  means  here  that  a  greater  load 
or  pressure  is  applied  to  the  joint  ties  than  was  applied  with  the  bars  in  machine  fit 
condition.  Necessarily,  with  an  increase  in  tie  loads,  these  joint  ties  would  be  pressed 
downward  more  under  traffic  and  would  soon  require  added  maintenance.  The  effect 
of  such  wear  in  the  bars  then  would  be  to  decrease  the  moment-carrying  capacity  of  the 
joint  and  to  force  the  ties  at  the  joint  downward  and  thus  produce  a  low  joint.  Nor 
could  re-surfacing  of  this  worn  joint  anew  give  more  than  a  temporary  normal  bending 
moment  for  the  joint.  In  such  cases  tightening  the  bolts  anew  will  increase  the  droop 
of  the  joint,  which  itself  produces  unfavorable  joint  conditions. 

The  three  joints  with  worn  bars  taken  from  track  and  tested  with  their  original 
rails  (line  d)  were  not  sufficiently  worn  to  cause  the  joint  to  droop  downward,  and  the 
moments  developed  are  similar  to  "as  is"  and  machine  fit  bars  having  like  joint  camber. 

As  was  noted  in  Article  16  "Effect  of  Camber  in  Joint  with  No  Re-tamping",  the 
two  joints  with  bars  selected  for  more  than  usual  camber  (lines  e  and  f)  develop  abnor- 
mally high  moments  in  two  separate  sets  of  tests.  The  average  of  the  moments  for  the 
three  wheels  shown  at  line  e  for  joint  Location  2  is  375,000  in.-lb.  as  compared  with 
305,000  in.-lb.  for  the  "as  is"  bars.  When  shims  were  placed  on  the  joint  ties  to  take  up 
the  play  between  rail  and  tie  and  to  give  full  support  from  the  beginning  of  loading  of 
the  tie,  as  a  wheel  rolls  along,  (line  g),  the  moment  developed  was  materially  decreased. 
Also,  the  joint  with  bars  selected  for  negative  camber  (line  h)  developed  at  joint  Loca- 
tion 2  a  relatively  low  bending  moment,  200,000  in.-lb.  as  compared  with  305,000  in.-lb. 
for  the  "as  is"  bars. 

The  three  vertical  lines  at  the  right  side  of  Fig.  31  have  F-4  bars  with  full  bear- 
ing along  their  length.  With  consideration  given  to  the  amounts  of  the  joint  camber,  it 
is  found  that  the  moments  developed  in  "as  is"  bars  (line  i)  at  joint  locations  1  and  2 
correspond  in  magnitude  with  the  moment  developed  in  the  machine  fit  bars.  At  joint 
Location  3,  regardless  of  a  higher  camber  in  the  "as  is"  joint,  the  moment  (260,000  in.- 
lb.)  is  une.xpectedly  small  for  a  camber  of  -f-0.009  in.  No  reason  is  known  for  this.  For 
joint  locations  1  and  2,  taking  into  account  the  joint  cambers,  the  moments  in  both  "as 
is"  and  machine  fit  bars  (lines  i  and  j)  correspond  fairly  closely  with  values  found  with 
the  F-4  controlled  bearing  bars  on  lines  a  and  b.  It  may  be  said  then  that  there  is  little 
difference  in  moment  caused  by  the  two  kinds  of  bearing  under  the  conditions  of  these 
tests. 

The  moments  for  three  full  bearing  36-in.  F-4  joints  in  a  simulated  wear  condition 
are  plotted  on  line  k.  There  is  seen  to  be  a  marked  decrease  in  moment,  the  average  of 
all  values  being  less  than  200,000  in.-lb.  The  camber  of  the  joints  was  reduced  greatly 
by  the  simulated  wear  condition  and  is  doubtless  the  source  of  the  low  moment. 

Fig.  32  gives  the  bending  moments  for  the  B.  &  O.  B-19  bars,  the  N.  &  W.  A-39 
angle  bars,  and  the  C.  &  O.  B-43  head-free  bars  for  the  several  conditions  of  the  bars. 
All  of  these  bars  had  a  length  of  36  in.  Beginning  at  the  left  vertical  line  1  the  mo- 
ments for  joints  with  B-19  bars  with  full  bearing  in  "as  is"  condition  are  given  for  the 
three  joint  locations.  All  the  plotted  points  are  above  300,000  in.-lb.  except  one  which  is 
slightly  below.  These  values  are  in  general  somewhat  higher  than  those  found  with  the 
lighter  F-4  "as  is"  bars  just  discussed.  The  camber  of  the  joints  of  the  two  types  was 
similar  in  amount,  although  at  Location  1  the  camber  is  somewhat  less  with  the  F-4  bars 
and  the  corresponding  moment  is  likewise  somewhat  smaller.  On  the  second  vertical  line 
(m),  with  B-19  bars  having  full  bearing  in  the  machine  fit  condition,  the  moments  are 
lower  by  an  average  of  more  than  55,000  in.-lb.  from  the  "as  is"  bars  at  the  same  three 
joint    locations.  This   decrease    in    moment    accompanies    a    decrease   in    camber,    which 


198 Stresses   in    Railroad   Track 

doubtless  is  the  source  of  the  decrease  in  moment,  since  with  both  conditions  the  fit, 
bolt  tension,  and  other  test  conditions  were  quite  similar. 

On  line  n  joints  with  B-19  bars  ground  to  simulate  wear  show  moments  markedly 
less  than  the  joints  with  "as  is"  and  machine  fit  bars  in  joint  locations  1  and  2,  averaging 
125,000  in.-lb.  less  than  the  average  moment  of  350,000  in.-lb.  for  the  "as  is"  condition 
for  the  same  two  locations.  Although  these  simulated  wear  B-19  joints  show  the  most 
marked  negative  camber  of  any  of  the  joints  tested,  including  the  F-4  bars  with 
negative  camber,  the  moments  developed  are  greater  than  in  the  simulated  wear  F-4 
joints,  due  doubtless  to  the  stiffer  section  of  the  B-19  bars. 

A  single  36-in.  B-19  controlled  bearing  machine  fit  joint  (line  o)  was  tested  at  joint 
Location  1.  The  moment  in  this  joint  was  low  with  respect  to  the  other  joints  tested 
at  this  location,  even  somewhat  lower  than  the  simulated  wear  joints  (see  lines  1,  m 
and  n).  This  joint  was  one  of  the  few  36-in.  joints  that  had  the  rail  ends  butting 
together  and  probably  most  of  the  reduction  in  moment  developed  in  the  joint  was  due 
to  this  condition.  The  camber  for  this  joint  (-0.002  in.)  was  similar  to  that  for  the 
other  machine  fit  bars. 

On  line  p  the  joints  with  36-in.  A-39  angle  bars  in  "as  is"  condition  have  moments 
averaging  310,000  and  310,000  in.-lb.  at  joint  locations  2  and  3,  values  which  are  closely 
similar  to  those  found  with  similar  tests  with  B-19  bars.  The  relatively  large  values 
developed  with  this  heavy  angle  bar  may  be  attributed  to  the  high  bolt  tension  main- 
tained during  the  tests,  about  30,000  lb.  This  high  bolt  tension  would  act  to  hold  the 
neutral  axis  fairly  close  to  horizontal  and  thus  would  avoid  a  decrease  in  stiffness  and 
in  bending  moment  which  has  been  found  in  angle  bars  when  tested  with  moderate 
and  low  bolt  tension. 

The  moments  developed  by  the  two  joints  with  36-in.  B-43  head-free  bars  are 
plotted  on  lines  q  and  r.  Both  joints  were  tested  at  joint  Location  3.  The  moments 
developed  (210,000  and  265,000  in.-lb.)  are  rather  low,  being  somewhat  less  than  those 
developed  by  the  F-4  joints  in  the  "as  is"  condition  and  materially  lower  than  those 
found  with  B-19  and  A-39  bars.  As  will  be  discussed  later  these  joints  in  some  instances 
showed  greater  movements  between  bar  and  rail  (vertical  and  longitudinal)  than  did 
the  other  joints,  even  at  the  high  bolt  tension  used,  (about  30,000  lb.).  These  larger 
movements  are  probably  the  cause  of  the  smaller  moments  developed. 

The  values  of  the  bending  moments  developed  in  the  various  types  of  bars  are  also 
plotted  in  Fig.  33  according  to  the  camber  measured  in  the  joint.  General  increase  in 
bending  moment  with  increase  in  camber  will  be  noted,  as  was  discussed  in  the  last 
article.  In  general,  too,  for  the  same  type  of  bar  and  for  similar  cambers,  joint  Loca- 
tion 1  gives  higher  moments  than  do  joint  locations  2  and  3.  For  similar  cambers 
joints  with  B-19  bars  show  higher  bending  moments  than  those  with  F-4  bars.  The 
B-43  head-free  bars  have  somewhat  lower  values.  In  general  the  values  for  the  same 
or  similar  conditions  are  in  as  close  agreement  as  can  be  expected  with  all  the  chances 
for  variation  that  exist  in  track  tests  of  this  kind. 

It  is  apparent  that  some  of  the  peculiarities  found  in  comparing  values  of  the 
bending  moments  developed  in  the  joints  are  due  to  such  matters  as  the  camber  of  the 
joint  and  the  characteristics  of  the  rail  supports  at  the  given  joint  locations.  A  few 
examples  may  be  cited.  With  the  B-19  bars  in  both  "as  is"  and  machine  fit  conditions, 
the  moment  developed  at  joint  Location  1  is  50,000  in.-lb.  greater  than  at  joint  loca- 
tions 2  and  3,  even  though  the  amount  of  the  camber  for  a  given  condition  is  nearly 
the  same  for  the  three  joint  locations.  For  the  B-19  controlled  bearing  bar  with  ma- 
chine fit,  the  moment  at  joint  Location  1  is  only  240,000  in.-lb.  as  compared  with 
320,000  in.-lb.  found  with  the  full  bearing  bars  of  the  same  type  and  condition  of  bar 


Type    and    Condition    of    Bar 


199 


400 


300' 


200 


100 


0 


O  F-4     Full  bearing 

<^  F-  4     Controlled   bearing 

X  A-39  Full  bearing 

+  B-43  Head- free 


•  B-19    Full  bearing  I- Location  I 

■^  B'I9    Conlrolled    bearing  2- Location  2 

D  B-19      24  in.  3 -Location  3 

■  B-19      24  in.     Simulated  wear 


-^ 


V^     3 


.■<^^-^' 


-hi' 


'So'iii- 


.■<^ 


<>3 


^^  <^3 


<^2 


M- 


7 


Shims  under 
rail 


-0.03       -0.02        -0.01  0  0.01  0.02 

Vertical    Camber  of   Joint  in   Inches  . 


0.03 


0.04 


Fig.  33. — Relation  between  Joint  Camber  and  Bending  Moment  Developed  in 
Rail  Joints  under  Drivers  of  Locomotive  at  Speed  of  5  Miles  per  Hour. 

at  the  same  joint  location.  The  camber  in  the  two  cases  is  quite  similar.  However,  in 
the  former  case  the  rail  gap  was  closed  by  the  high  rail  temperature  existing  at  the 
time  of  the  test.  Comparing  joints  with  both  full  bearing  and  controlled  bearing  F-4 
"as  is"  bars  at  joint  locations  1  and  2,  the  relatively  small  value  of  the  moment  at 
Location  1  in  both  cases  accompanies  a  small  camber  and  the  relatively  large  value 
at  Location  2  is  found  with  a  camber  of  -f  0.012  in.  or  more. 

Three  pairs  of  24-in.  B-19  full  bearing  bars  in  machine  fit  condition  were  tested 
at  joint  locations  1,  2  and  3,  one  pair  of  24-in.  B-19  controlled  bearing  bars  also  in 
machine  fit  condition  at  joint  Location  1,  and  one  pair  of  24-in.  B-19  full  bearing 
bars  in  simulated  wear  condition  at  Location  3.  These  joints  all  gave  bending  moments 
materially  smaller  than  did  the  joints  with  36-in.  bars  having  the  same  conditions  (see 
Table  9  and  Fig.  33).  The  average  of  the  moments  developed  in  the  four  joints  with 
24-in.  machine  fit  bars  was  180,000  in. -lb.  The  average  of  the  moments  developed  with 
the  corresponding  36-in.  B-19  bars  was  280,000  in.-lb.  The  moment  developed  in  the 
one  joint  tested  with  24-in.  simulated  wear  bars  was  155,000  in.-lb.  and  that  with 
36-in.  simulated  wear  bars  was  225,000  in.-lb.  Previous  tests  in  both  laboratory  and 
track  have  shown  little  differences  in  deflection,  stress,  and  moment  for  joints  with 
bar  lengths  of  24  and  36  in.  In  the  present  case  fit,  joint  camber,  and  other  conditions 
were  apparently  approximately  the  same.  The  one  known  difference  in  condition  of 
test  was  that  in  these  tests  in  track  with  24-in.  bars,  in  spite  of  the  high  bolt  tension 
used,  the  high  temperature  in  the  rail  at  the  time  of  test  forced  the  rails  together  in  a 
way  that  gave  lower  values  to  the  flexural  compressive  stresses  developed  in  the  bars 
when  loaded,  and  likewise  possibly  lowered  the  tensile  stresses  also. 

In  an  effort  to  learn  something  of  the  effect  of  the  closure  of  the  gap  on  the 
stresses  and  moments  developed  in  the  joint  bars,  a  study  was  made  of  the  data 
of   the   field   tests   of   joints   with   36-in.  bars  in   which   the   rail   gaps  had   been   closed 


200 


Stresses   in    Railroad   Track 


by  the  high  temperatures,  but  it  was  found  that  the  conditions  were  not  generally 
sufficiently  similar  to  warrant  drawing  a  conclusion.  However,  one  joint  with  36-in. 
B-19  bars  (controlled  bearings)  had  no  gap  and  gave  a  markedly  low  moment  in 
comparison  with  a  joint  of  the  same  type  with  full  bearing  bars  at  the  same  joint 
location — thus  pointing  to  a  definite  probability  of  a  reduction  of  moment  in  bars 
through  closing  of  the  gap.  A  laboratory  test  was  made  in  the  rolling  load  testing 
machine  on  a  joint  having  24-in.  B-19  joint  bars  by  rolling  the  load  of  45,000  lb. 
along  the  span  of  36  in.,  first  with  a  rail  gap  of  about  %  in.  and  second  with  a  wedge 
driven  into  the  rail  gap  between  the  heads  of  the  two  rails.  The  bending  moments 
developed  in  the  joint  bars  at  mid-span  were  calculated  from  the  measured  stresses. 
The  moment  in  the  bars  was  found  to  be  about  12  percent  less  in  the  second  test  than 
in  the  first.  After  giving  consideration  to  the  analysis  of  possible  conditions  it  is  thought 
that  with  the  gap  closed  by  an  increase  in  temperature  in  the  rails,  as  a  result  of  the 
high  compression  developed  in  the  head  and  other  parts  of  the  rails,  the  beam  action 
of  the  joint  is  modified  in  a  way  that  causes  a  decrease  in  the  stresses  in  the  bars  and 
likewise  a  decrease  in  the  moment  that  would  otherwise  be  taken  by  the  bars. 


Table  10 

Average  Joint  Moment  Ratios  at  5  Miles  per  Hour 
The  base  of  the  joint  moment  ratio  is  taken  as  370,000  in.  lb. 


Joint  Bars 

Condition 

Bending  Moment 
( Inch  pounds) 

Joint 
Moment  Ratio 

F-4 

As  is 

285,000 

.77 

F-4 

Uachlne  fit 

270,000 

.73 

F-4 

Simulated  wear 

190,000 

.51 

B-19 

As  is 

335,000 

.91 

B-19 

Machine  fit 

280,000 

.76 

B-19 

Slmulatsd  wear 

225,000 

.61 

A-39* 

As  is 

310,000 

.84 

B-43t 

As  is 

240,000 

.65 

*  Two  joints  tested  at  Locations  2  and  3 
1  Two  Joints  tested  at  Locution  3 

In  view  of  these  considerations  and  with  the  evidence  of  previous  tests,  the 
development  of  a  smaller  moment  in  the  joints  with  24-in.  bars  should  not  be  taken 
as  establishing  a  superiority  m  the  36-in.  length  over  the  24-in.  length  in  respect  to 
ability  to  carry  bending  moment.  The  results  indicate,  however,  the  need  for  adequate 
tests  to  be  made  on  joints  in  track  with  24-in.  and  36-in.  bars. 

The  effectiveness  of  a  rail  joint  in  track  may  be  judged  by  its  ability  to  develop 
and  carry  bending  moment  under  normal  conditions  of  tie  support  and  to  approach, 
as  closely  as  may  be,  the  stiffness  and  the  moment  carrying  capacity  of  the  full  rail. 
In  earlier  reports  of  the  committee  the  term  "joint  moment  ratio"  has  been  used  as 
the  ratio  of  the  bending  moment  developed  in  the  joint  to  the  bending  moment  developed 
in  the  full  rail  under  similar  supporting  conditions.  The  general  average  value  of  the 
bending  moment  in  the  rail  under  the  load  of  the  six  driving  wheels  of  the  locomotive 
used  in  the  tests  was  taken  as  370,000  in.-lb.  This  value  is  approximately  the  average 
of  the  calculated  and  measured  moments  for  the  six  driving  wheels  at  a  speed  of  five 


Relation    of    Speed    to    Type    of    Bar  201 

miles  per  hour,  which  were  given  in  Article  9  "Stresses  and  Moments  in  Rail".  Using 
this  value  as  a  base,  the  joint  moment  ratios  obtained  with  the  bending  moments  found 
in  the  tests  of  the  joint  at  five  miles  per  hour,  calculated  from  the  values  given  in 
Table  9,  are  given  in  Table  10.  Since  the  camber  of  the  joints  as  they  stood  originally 
in  the  track  before  the  new  rails  and  joint  bars  were  put  in  is  not  known,  the  actual 
relation  of  the  tie  supports  to  the  camber  found  for  the  various  joints  during  the  tests 
is  uncertain,  but  it  is  very  likely  true  that  the  camber  in  these  original  joints  lay 
between  that  found  with  the  machine  fit  and  the  "as  is''  conditions,  say  between  zero 
and  +  0.010  in.  In  other  words,  if  the  tie  supports  had  been  fitted  to  the  camber  of 
the  "as  is"  joints  by  re-tamping  the  moments  developed  in  these  joints  would  probably 
have  been  smaller  than  those  given  in  Table  10,  and  likewise  with  tamping  to  conform 
to  the  camber  of  the  joint  the  moments  developed  in  the  machine  fit  bars  would  have 
been  greater  than  those  given  in  the  table.  Also  under  these  conditions  there  would 
have  been  little  difference  between  the  moments  for  the  "as  is"  and  those  for  the 
machine  fit  bars.  Possibly  the  joint  moment  ratio  for  the  F-4  bars  would  then  be 
about  0.75  and  for  the  B-19  bars  about  0.8S.  The  difference  between  these  two  values 
may  be  taken  to  mean  that  the  stiffer  B-19  bars  have  advantages  over  the  F^  bars, 
though  the  difference  in  effectiveness  throughout  the  lifetime  of  the  joints  may  be 
expected  to  be  greater  than  shown  by  the  difference  in  these  numerical  values. 

The  comparison  has  been  made  between  F-4  and  B-19  bars  because  of  the  number 
of  tests  and  of  joint  locations  used.  For  the  same  two  joint  locations  there  is  little 
difference  in  the  joint  moment  ratio  for  the  B-19  bars  and  the  A-39  bars.  For  the 
B-^3  bars,  however,  the  joint  moment  ratio  is  less  than  for  the  B-19  bars. 

The  comparisons  have  been  made  on  the  data  taken  at  five  miles  per  hour  because 
at  this  speed  the  loads  applied  by  the  individual  wheels  of  the  locomotive  are  evidently 
more  nearly  the  same  throughout  the  many  runs  than  could  be  expected  at  the  higher 
speeds.  Lateral  loads  and  forces  and  transfers  of  load  from  one  wheel  to  another  were 
more  marked  and  more  frequent,  as  will  be  noted  in  a  study  of  the  data  of  the 
higher  speeds. 

18.  Relation  of  Speed  to  Type  and  Condition  of  Bar.— In  Fig?.  34  and  35 
the  values  of  the  moments  developed  in  the  joints  at  speeds  from  S  to  90  miles  per 
hour  are  plotted  with  respect  to  speed.  The  values  shown  are  generally  the  average  of 
three  or  more  runs  at  a  given  speed;  they  are  given  for  each  of  the  three  driving 
wheels  and  for  the  three  joint  locations.  A  line  has  been  drawn  through  the  average 
moment  for  the  three  driving  wheels  at  each  of  the  several  speeds.  The  type  of  joint, 
their  condition,  and  other  pertinent  data  are  given  with  each  set  of  points. 

The  tests  were  made  in  an  effort  to  learn  what  influence  type  of  bar,  condition, 
and  other  variations  had  on  the  action  of  the  joint  when  the  locomotive  was  operated 
at  high  speed.  As  in  the  tests  of  stress  in  rail  previously  discussed  the  action  of  the 
locomotive  at  the  higher  speeds  was  found  to  be  quite  different  at  one  location  from 
that  at  another  and  much  more  variable  at  high  speed  than  at  five  miles  per  hour. 
This  variety  of  action  on  the  part  of  the  locomotive  made  it  impracticable  to  determine 
the  effect  of  joint  type  or  condition  in  relation  to  speed.  Since  no  two  of  the  three 
joint  locations  were  opposite  each  other  on  right  and  left  rails,  it  is  not  desirable  to 
average  the  results  at  the  higher  speeds  for  the  two  rails,  as  was  done  for  the  stresses 
measured  in  the  rails.  It  will  be  recalled  that  the  average  of  the  rail  moments  for  the 
two  wheels  of  an  axle  was  found  to  be  approximately  constant  for  all  speeds  for  a 
given  location  along  the  track  despite  the  large  variation  in  the  individual  values  for 
one  rail.  This  would  indicate  that  the  variations  were  mostly  transfers  of  load  from 
one  wheel  to  the  other  on  the  .same  axle.  However,  it   was   found   that   the  individual 


202 


Stresses    in    Railroad    Track 


Joint   Location  I  Joint   Location    2  Joint  Location    3 

Speed   in   Miles  per  Hour 
O        30        60        90    O        30       60        90     O         30       60        90 


^ 


100 


Fig.  34. — Relation  between  Speed  and  Bending  Moment  Developed 
with  F-4  Rail  Joints. 

runs  at  a  given  location  and  given  speed  showed  little  variation,  which  indicates  that 
the  locomotive  produced  similar  results  under  given  conditions. 

The  new,  unworn  condition  of  the  bars  and  rails,  the  excellence  of  surface,  and 
the  high   quality  of  the  support  were  undoubtedly  a  factor  in  minimizing  effects  of 


Relation    of    Sp  eed    to    Type    of    Bar 


203 


400 
300 
200 

too 

300 
200 
100 
300 

^    200 

^-     100 
o 

^    300 

I    200 

■^     100 
c 

I  300 
200 
100 
300 
200 

too 

300 
200 

100^ 


Joint   Location  I  Joint   Location    2  Joint   Location    3 

Speed    in   Miles   per   Hour 
30        60       90     0        30       60        9.0     0         30        60       90 


H-  . 
ox 


8-19,  C.B.  Bars,  Mact)ine    fit 

-^ 1 — 


[         (24  in.  bars  at  Joint  Location  I) 
LX X 


-% 


B-43,  H.F.Bars.As    is 

___j , <^  ^^ 

(at   Joint    Location  3) 


+    / "  Driver 

y.    2""  Driver 

O   3"'  Driver 

•Av.  of  3  drivers 


+ 
ox- 


X-  -  t 


x^" 


Fig.  35. — Relation  between  Speed  and  Bending  Moment  Developed 
with  Several  Types  of  Rail  Joints. 

speed,   as   was   also   the   high    bolt   tension    required   in    the   joints   to   give   satisfactory 
operation  of  some  of  the  instruments. 

Because  of  the  conditions  discussed  above,  the  results  for  the  higher  speeds  will  be 
discussed  only  in  a  general  way  and  comments  will  be  made  on  illustrative  examples. 


204  Stresses    in    Railroad    Track 

An  inspection  of  Figs.  34  and  35  shows  that  at  joint  locations  1  and  2  the  average 
of  the  ntioments  for  the  three  wheels  has  a  downward  trend  with  increase  of  speed. 
At  Joint  Location  3  the  average  moment  increases  or  shows  little  change.  Joint  Location  1 
is  the  first  test  location  the  locomotive  passed  over  and  is  on  the  right  rail  and  Joint 
Location  2  is  one-half  rail  length  ahead  on  the  left  rail.  Joint  Location  3  is  the  last 
test  location  passed  by  the  locomotive  one  rail  length  beyond  Joint  Location  1  and  is 
also  on  the  right  rail.  This  decrease  of  moment  at  joint  locations  1  and  2  with  increase 
of  speed  should  not  be  taken  to  indicate  that  a  low  value  of  moment  exists  all  along 
the  track.  At  places  along  the  track  other  than  the  test  locations  the  locomotive 
probably  will  act  in  a  somewhat  different  manner,  and  the  moments  will  have  different 
relations  to  the  speed.  These  other  places  may  be  some  distance  away,  for  at  high 
speeds  a  complete  oscillation  or  other  movement  of  the  locomotive  or  one  of  its  parts 
will  cover  a  considerable  distance. 

Some  further  comments  may  be  made.  The  joint  moments  developed  by  the  indi- 
vidual driving  wheels  at  the  higher  speeds  show  a  wide  spread  of  magnitudes  and  a 
variety  of  manner  of  action  even  at  one  given  joint  location  and  with  a  given  set 
of  bars.  There  are  some  few  high  values  of  joint  moment  at  the  high  speeds,  about 
400,000  in.-lb.  Very  frequently  the  first  driving  wheel  develops  the  highest  moment, 
and  in  such  cases  this  occurs  at  all  three  of  the  joint  locations.  The  variations  in  values 
at  the  higher  speeds  are  doubtless  due  principally  to  the  variations  in  the  action  of  the 
locomotive.  Conditions  of  the  track  along  its  length  also  enter  into  the  variations,  for 
different  runs  at  a  given  speed  usually  give  similar  moments  at  one  wheel.  No  systematic 
increase  in  stress  or  moment  at  the  high  speeds  with  the  locomotive  used  was  found, 
though  the  wide  spread  of  values  is  an  indication  that  values  still  higher  than  those 
recorded  may  be  developed  with  more  or  less  frequency.  The  outstanding  result  is  the 
marked  variation  in  the  magnitude  of  the  moments  developed  in  the  joints  at  the 
high  speeds. 

It  should  again  be  called  to  mind  that  in  the  case  of  the  moments  in  the  right 
and  the  left  rail,  the  averages  for  the  two  rails  at  opposite  points  showed  little  effect 
of  speed,  yet  some  individual  values  in  one  rail  or  the  other  were  considerably  in  excess 
of  the  average,  as  high  as  500,000  in.-lb.  An  unduly  low  moment  developed  by  a  wheel 
at  one  location  probably  means  an  unduly  high  moment  at  some  other  location  and 
the  joint  may  thus  be  subject  frequently  to  higher  moments  than  the  values  shown 
in  Figs.  34  and  35. 

The  moments  shown  for  the  several  joints  may  be  said  to  be  moderate  in  magnitude 
in  most  instances,  due  probably  to  the  very  excellent  condition  of  the  joints  and  the 
support.  Less  favorable  conditions,  such  as  battered  rail  ends,  were  found  to  add 
appreciably  to  the  moments  developed  and  the  variety  of  action  shown  may  be  expected 
to  give  increases  of  moment  that  will  further  tax  the  strength  of  the  joint. 

19.  Vertical  and  Longitudinal  Movements  Between  Joint  Bars  and  Rails. — 
A  purpose  of  the  tests  was  to  measure  some  of  the  vertical  and  longitudinal  movements 
between  the  bars  and  the  rail  and  learn  how  they  change  as  the  locomotive  passes. 
The  small  movements  that  take  place  between  the  fishing  surfaces  are  undoubtedly  the 
cause  of  much  of  the  wear,  especially  when  the  movements  are  accompanied  by  high 
bearing  pressures.  Movements  between  the  rail  and  the  bar  also  decrease  the  effectiveness 
of  the  joint  in  the  track.  The  effect  of  speed  on  the  magnitude  of  these  movements  and 
on  the  manner  in  which  they  varied  has  also  been  a  subject  of  speculation.  It  has  been 
felt  that  the  higher  speeds  cause  greater  damage  to  the  rail  joints  and  that  some  of  this 
damage  might  be  through  wear  or  impact  effects  from  sudden  movements  in  the  joint. 


Movements    Between    Joint    Bars    and    Rails  205 

The  measurements  that  could  be  taken  were  limited  by  the  number  of  gages  available 
and  the  clearances.  Four  gages  recorded  the  relative  vertical  movements  between  head 
of  rail  and  top  of  bar  at  the  rail  ends  and  at  each  end  of  the  bar,  all  for  the  outer  bar. 
Two  gages,  one  at  each  rail  end,  measured  the  relative  longitudinal  movement  between 
the  rail  head  and  the  mid-length  of  the  outer  bar.  Views  of  these  gages  mounted  on  a 
joint  bar  in  track  are  shown  in  Fig.  7.  No  gages  were  placed  on  the  inner  bar  because 
of  lack  of  clearance  for  the  wheel  flanges.  It  was  not  possible  to  mount  gages  for  both 
vertical  and  longitudinal  movement  on  the  same  joint,  so  the  gages  were  alternated  and 
additional  sets  of  runs  made  to  obtain  values  for  all  the  test  joints. 

Unfortunately  it  was  necessary  to  use  a  high  bolt  tension  to  restrain  the  rails  from 
moving  in  the  joint  and  thus  to  prevent  damage  to  instruments  and  uncertainty  in  the 
records.  This  high  bolt  tension  decreased  the  movements  greatly  and  probably  eliminated 
some  of  the  speed  effects  that  may  be  present,  especially  in  badly  worn  or  poorly 
fitting  joints. 

Typical  records  of  the  vertical  movements  for  run  No.  247  at  five  miles  per  hour  are 
shown  in  Fig.  36.  The  joint  had  B-19  bars  in  "as  is"  condition  at  Joint  Location  1  on 
the  right  rail.  The  records  were  made  by  oscillograph  A  and  are  numbered  lA  to  6A 
from  the  bottom  of  the  record.  The  square  peaks  at  the  extreme  lower  edge  of  the  film 
made  by  the  timing  galvanometer  are  spaced  at  half-second  intervals.  The  four  gage 
positions  (see  Fig.  7)  are  designated  as  Vi,  Va,  Va  and  V^  and  they  are  respectively  the 
end  of  the  bar  on  the  leaving  rail,  the  middle  of  the  bar  on  the  leaving  rail,  the  middle 
of  the  bar  on  the  receiving  rail,  and  the  end  of  the  bar  on  the  receiving  rail.  All  posi- 
tions are  on  the  outer  bar  only,  and  Vi  is  the  first  position  passed  by  the  locomotive. 
Record  lA  is  for  position  Vi,  2A  for  V2,  3A  for  Va  and  4A  for  V4.  The  fifth  record,  5A, 
is  the  stress  at  gage  line  C  of  the  outer  bar  and  its  peaks  locate  the  position  of  the 
wheels  with  respect  to  the  mid-length  of  the  joint.  Since  the  three  driving  wheels  were 
spaced  exactly  ten  feet  apart,  distances  may  readily  be  scaled  off  along  the  record.  The 
sixth  record  is  the  stress  at  gage  line  C  on  the  inner  bar  at  joint  location  3 ;  this  is  a 
rail  length  farther  along  the  track  than  the  joint  on  which  the  rest  of  the  records  were 
taken  and  is  also  on  the  right  rail.  Similar  records  for  run  No.  245  on  the  same  joint 
at  90  miles  per  hour  are  shown  in  Fig.  36.  The  timing  record  at  the  bottom  gives  one- 
sixtieth  second  intervals. 

Some  comments  may  be  made  on  the  shape  and  characteristics  of  the  records.  The 
two  films  shown  in  Fig.  36  were  taken  on  runs  for  the  same  joint  at  5  miles  per  hour 
and  at  90  miles  per  hour.  Some  of  the  records  for  the  movements  at  the  various  gage 
positions  are  seen  to  be  somewhat  similar  in  shape  to  the  stress  records,  indicating  that 
generally  these  movements  begin  to  take  place  as  the  wheel  approaches  the  gage  and  is 
yet  some  distance  away.  The  maximum  or  peak  values  occur  with  the  wheel  over  the 
gage  and  then  the  movement  decreases  as  the  wheel  leaves  the  gage  position.  The  wheel 
position  along  the  records  may  be  determined  by  record  5A  whose  peaks  show  when  the 
wheel  is  at  mid-length  of  the  joint. 

In  some  cases  part  of  the  vertical  movement  takes  place  with  considerable  rapidity. 
An  example  of  this  may  be  seen  at  gage  position  Va  (record  3A  in  Fig.  36)  at  90  miles 
per  hour.  At  this  gage  the  movement  at  the  receiving  rail  end  shows  a  very  quick  in- 
crease in  magnitude  as  the  wheels  pass  the  mid-length  of  the  joint.  This  sudden  increase 
probably  takes  place  as  the  wheel  strikes  the  receiving  rail  end.  The  time  interval  over 
which  this  rapid  change  in  the  movement  magnitude  takes  place  is  very  small  at  90  miles 
per  hour,  probably  approaching  0.001  of  a  second.  The  decrease  in  magnitude  as  the 
wheel  leaves  the  mid-length  of  the  joint  is  at  a  relatively  slower  rate.  The  rapid  rate  of 
increase  of  movement  at  the  receiving  rail  end  may  be  equivalent  to  an  impact  effect  that 


206 


Stresses    in    Railroad    Track 


possibly  is  a  cause  of  the  increased  wear  generally  observed  at  the  receiving  rail  end  on 
both  rail  surface  and  bar  fishing  surface.  The  whole  cycle  of  the  vertical  movement 
changes  from  a  zero  magnitude  to  a  maximum  magnitude  and  again  to  zero  in  0.01  to 
0.02  sec.  while  the  locomotive  is  covering  a  distance  of  about  15  to  30  in.  when  running 
at  90  mDes  per  hour. 

The  algebraic  signs  on  the  records  at  the  right  side  of  the  figures  indicate  the  kind 
of  movement  or  stress.  A  plus  sign  means  an  increase  in  distance  or  a  tensile  stress  and  a 


6A 


n^^n^ 


tOOQOp.s.i. 

\5A 
0.005  in. 
4A     V4 


MMFyMMMH 

Run  245,0sc.A 
3A     i/j 

»mimmm 


dOm.p.h. 
2A      V2 


I A       Vi 


\aaaaaaaa  a^_a_a  a  a  a  rt  a  a 


o  o 


Fig.  36.— Typical  Records  of  Vertical  Movement  between  Bar  and  Rail  Head 
at  5  and  90  Miles  per  Hour— Also  Stress  in  Bars. 


Movements    Between    Joint    Bars    and    Rails 207 

negative  sign  the  opposite.  Previous  experience  in  static  field  tests  and  laboratory  tests 
had  indicated  that  with  the  load  at  the  mid-length  of  the  joint  there  should  be  a 
decrease  in  the  distance  or  space  between  the  top  of  the  bar  and  the  rail  head  at  the  rail 
end  and  an  increase  at  the  ends  of  the  bars.  The  application  of  load  at  the  bar  ends 
with  well  fitting  bars  in  these  previous  tests  did  not  produce  much  movement  at  the 
point  of  application  of  the  load. 

Inspection  of  the  records  shows  several  points  at  variance  with  this  previous  experi- 
ence. An  outstanding  difference  is  the  direction  of  the  vertical  movement  under  the 
middle  driving  wheel  as  compared  to  the  other  wheels,  given  in  Fig.  36.  In  most  cases 
in  these  records  and  in  the  other  records  taken,  the  middle  driving  wheel  produces  a 
movement  opposite  in  direction  to  that  of  the  other  wheels.  There  are  some  exceptions 
to  this  statement  but  in  general  the  middle  driving  wheel  produces  a  negative  movement 
or  decrease  in  distance  for  all  gage  positions  whether  at  the  bar  ends  or  the  rail  ends  at 
the  time  the  wheel  is  over  the  gage  and  the  other  wheels  cause  a  positive  movement  or 
increase  of  distance  between  bar  and  rail.  It  can  also  be  noted  from  the  records  that 
there  is  little  if  any  movement  at  the  ends  of  the  bar  when  the  wheel  is  at  the  middle  of 
the  joint.  The  vertical  movements  shown  in  the  records  are  of  the  order  of  0.002  in.  or 
less,  as  can  be  seen  from  the  scales  given.  The  high  bolt  tension  and  good  fit  of  most 
of  the  bars  tested  tended  to  minimize  the  movements. 

The  movement  produced  by  the  second  or  middle  driving  wheel,  though  at  variance 
with  most  of  the  other  wheels  is  more  nearly  in  agreement  with  the  results  expected. 
A  number  of  possibilities  as  to  the  cause  of  these  differences  between  the  movements  at 
the  various  wheels  were  investigated  both  at  the  time  of  the  tests  and  in  correlating  the 
results  but  no  definite  factor  has  been  proven  to  cause  them.  The  instrumental  equip- 
ment was  checked  at  the  time  of  the  tests  for  direction  of  deflection  and  possible  elec- 
trical or  magnetic  differences  and  static  tests  were  also  made.  A  difficulty  encountered  in 
correlating  these  differences  in  the  results  was  that  only  vertical  movements  were  meas- 
ured on  a  given  joint  for  a  given  set  of  runs,  except  the  one  stress  recorded  for 
location  of  wheel  position. 

A  possible  explanation  that  may  be  offered  but  has  not  been  proved  is  that  the 
differences  referred  to  above  are  caused  by  the  difference  in  the  bearing  of  the  wheel  on 
the  top  of  rail.  The  tire  of  the  middle  driving  wheel  was  flangeless  and  all  other  tires 
were  flanged  and  coned.  The  blind  tire  will  tend  to  give  bearing  at  the  middle  of  the 
rail  head  or  possibly  outside  the  middle  with  the  rail  canted,  and  the  coned  tires  gen- 
erally have  a  bearing  somewhat  inside  the  middle  of  the  head  even  with  the  cant  of  the 
rail  of  1  in  40.  This  eccentricity  of  bearing  may  produce  enough  tilting  and  twisting  of 
the  rail  head  to  cause  a  movement  comparable  to  or  even  greater  than  the  small 
movements  resulting  from  the  action  of  the  joint.  There  was  no  way  of  checking  this 
possibility  from  the  data  of  the  tests.  It  would  have  been  especially  desirable  to  have 
readin'-'s  also  on  the  inner  bar  to  determine  whether  the  rail  head  did  till  but  clearance 
did  not  permit  the  application  of  gages  on  the  inner  bar. 

The  vertical  movements  showed  little  or  no  change  with  increase  of  speed,  and  so 
it  is  not  deemed  necessary  to  show  the  results  for  all  speeds.  The  values  of  vertical 
movement  for  the  three  wheels  at  the  four  gage  lines  for  a  speed  of  five  miles  per  hour 
and  for  the  various  kinds  and  conditions  of  joints  are  shown  in  Fig.  .^7.  The  values  are 
the  average  of  all  the  runs  and  the  three  joint  locations.  It  was  found  that,  with  a  few 
exceptions,  there  was  little  difference  at  the  several  locations. 

The  values  plotted  are  the  maximum  movements  regardless  of  the  position  of  the 
wheel  rather  than  values  when  the  wheel  was  over  the  middle  of  the  joint.  The  maximum 
values  normally  occurred  when  the  wheel  was  over  the  gage.  Thus  the  peaks  of  the  values 


208 


Stresses    in    Railroad    Track 


for  Vi  and  V4  are  seen  in  Fig.  36  to  be  displaced  along  the  record  by  the  length  of  the 
joint  to  the  scale  of  the  figure.  Since  the  scale  in  this  direction  is  relatively  small  this 
displacement  is  not  very  noticeable. 

It  may  be  noted  from  Fig.  37  that  the  values  shown  are  small  in  magnitude,  few 
being  over  0.003  in.,  except  with  the  simulated  wear  joints  and  one  of  the  head-free 
joints.  These  values  are  similar  in  amount  to  movements  measured  in  static  tests  previ- 
ously reported  with  tight  bolts  and  well  fitting  bars.  Attention  should  again  be  called 
however,  to  the  manner  of  the  movements  as  shown  by  the  sign  of  the  plotted  values. 
As  discussed  for  the  records  shown  in  Fig.  36  the  middle  or  second  driver  is  seen  to  give 
a  closing  movement  in  almost  all  tests  and  the  first  and  third  drivers  generally  give 


^0.010 
+  0.005 
0 
-0.005 
+  0.005 
0 

.~~    2  -0.005 
§  +0.005 

"to 

°  I  0 

■^    I   -0.005 
^  S  +0.005 


t  .- 


-Q     c; 


0 


^    o   -0.005 
(J 


0)     -C 


+  0.005 
0 


_  C3.  -0.005 

o  .S 

.0  c 

^  Ci 

§  D 


t     + 


0 

-0.005 
+  0.005 
0 
-0.005 
-0.010 
-0.0/5 


Receiving 


1 

+  /^'  Driver 
X  2"''  Driver 
0   3"^      Driver 


B-19    Full   Bearing     36  in. 


-  As    is 


"1 


^ fl./9    Full  Bearing    24in.- 

t  -^cf-  (^    Machine      i  t        -lA  Af         t 


X    X 


'^ 


-H 


.i  u- 


_^    Simulated 
I         wear 


<> 


■-¥-9 


<> 


Fig.  37. — Relative  Vertical  Movement  between  Bar  and  Rail  Head  for 
Various  Types  and  Conditions  of  Rail  Joints  at  5  Miles  per  Hour. 


Mo\'emcnts    Bet  ween    Joint    Bars    and    Rails 209 

either  a  small  opening  movement  or  a  negligible  movement.  Some  few  values  are  at 
variance  with  those  statements  but  not  in  any  large  amount  and  in  some  cases  it  was 
difficult  to  determine  the  way  in  which  the  records  should  be  interpreted. 

The  joints  having  bars  simulating  wear  are  seen  to  have  considerably  larger  closing 
(negative)  movements  under  the  second  driver  at  the  middle  of  the  bar  length  (positions 
Vi  and  V3)  and  smaller  closing  movements  under  the  first  and  third  drivers.  The  move- 
ments at  the  ends  of  the  bars  do  not  appear  to  be  changed  much  by  the  simulated  wear 
condition,  as  might  be  expected  because  no  change  was  made  in  the  fit  at  the  ends.  The 
movements  are  also  greater  at  the  receiving  rail  end  than  at  the  leaving  rail  end,  prob- 
ably the  result  of  the  longer  slope  on  the  ground-out  portion  of  the  bar  at  the  receiving 
rail  end. 

The  F-4  bars  with  controlled  bearing  in  the  worn  condition  are  seen  to  have  small 
vertical  movements  showing  that  the  wear  on  these  bars  was  not  large. 

Two  B-43  joints  were  tested  at  Joint  Location  3  and  the  average  of  the  results  is 
plotted  in  Fig.  37.  The  vertical  movements  measured  for  the  two  joints  differed  some- 
what from  each  other  at  corresponding  gage  lines.  These  differences  were  possibly  due 
to  the  fact  that  a  locomotive  other  than  the  regular  locomotive  was  used  for  the  tests 
on  one  of  the  joints.  The  second  driving  wheel  of  the  regular  locomotive  produced 
markedly  large  movements  (about  0.010  in.)  similar  in  magnitude  to  those  found  with 
the  simulated  wear  joints. 

The  necessity  for  using  high  bolt  tension  in  the  joints  and  the  excellence  of  fit  of  the 
test  joints  available  for  test  detracted  from  the  value  of  the  results  as  a  basis  for  judging 
the  effects  of  some  of  the  factors  entering  into  the  action  of  joint  bars.  Tests  on  some 
of  the  types  and  conditions  of  bars  after  a  portion  of  their  service  life  had  been  passed 
would  probably  be  more  informative  and  show  results  more  characteristic  of  the  several 
factors. 

Little  evidence  was  found  of  any  effect  of  speed,  though  the  form  of  the  records 
showed  that  at  the  higher  speeds  some  of  the  movements  take  place  with  great  rapidity. 

The  relative  longitudinal  movement  of  the  two  rail  ends  with  respect  to  the  upper 
fishing  surface  of  the  outer  joint  bar  at  mid-length  was  measured  by  two  specially 
designed  magnetic  strain  gages.  The  two  gages  were  attached  to  the  rail  ends  and  the 
middle  portion  of  the  outer  joint  bars  as  shown  in  Fig.  7  to  indicate  the  relative  longi- 
tudinal movement  that  took  place  between  the  rail  ends  and  the  mid-length  of  the  joint 
bar.  Lack  of  clearance  would  not  permit  gages  to  be  appUed  to  the  inner  bar  so  all 
measurements  were  on  the  outer  bar. 

The  longitudinal  movements  take  place  between  the  fishing  surfaces  of  the  bar  and 
rail  because  of  the  differences  in  the  flexural  curvature  of  the  rail  and  the  bars  along 
the  length  of  the  joint  when  under  load  and  the  differences  in  magnitude  of  the  longi- 
tudinal strains  developed  at  the  fishing  surfaces  of  the  bars  and  the  rails.  The  friction 
between  the  surfaces  is  insufficient  to  prevent  slip  from  occurring.  At  the  rail  ends 
where  this  slip  is  a  maximum  there  are  high  bearing  pressures  due  to  the  development 
of  moment  in  the  joint.  It  has  been  demonstrated  by  Gough  and  Clenshaw"  that  even 
a  ver>'  minute  slip  will  produce  wear  when  accompanied  by  high  bearing  pressures. 
Since  the  rail  flexural  stress  at  the  rail  ends  is  zero  and  that  in  the  bars  is  a  maximum, 
we  may  expect  a  relatively  large  slip  at  the  mid-length  of  the  joint  for  this  reason  alone. 
The  effect  of  speed  on  this  action  was  unknown  and  a  purpose  of  the  tests  was  to  see 

•""The  Testing  of  Engineering  Materials"  by  H.  J.  Gough,  M.B.E.,  D.Sc,  F.R..S.  ami  W.  J. 
Clenshaw,  B.Sc,  of  the  Engineering  Department,  National  Physical  Laboratory,  Teddingtuii,  England. 
(Reprinted  from  the  Transactions  of  the  Institute  of  Marine  Engineers) 


210 


Stresses    in    Railroad    Track 


if  there  were  any  differences  in  the  action  at  the  higher  speeds  that  would  produce 
increased  wear  or  deterioration  of  the  joint. 

The  picture  of  the  action  of  the  longitudinal  movement  or  slip  in  the  joint  as  a 
whole  cannot  be  obtained  from  the  results  from  two  gages  at  the  rail  ends,  but  a  number 
of  laboratory  tests  made  previously  show  that  the  slip  takes  place  along  the  fishing 
surfaces  of  the  bars.  Coincidence  of  the  larger  values  of  slip  with  the  locations  where 
high  bearing  pressures  have  been  found  to  occur  should  determine  areas  of  greatest 
wear.  The  slip  measured  along  the  top  fishing  surface  of  a  36-in.  105-lb.  New  York 
Central  rail  joint  and  a  24-in.  90-lb.  Illinois  Central  rail  joint  is  shown  in  Fig.  38.  These 
joints  were  tested  in   the  laboratory.  The  New  York   Central  joint  was  loaded  with 


Distance   from   Mid-lenglh  of  Joint   Bar  in   Inches 

18    15       It        7        3      0    3        7        It        15    la 

-0.004 

-0.003 

to 

I  -0.002 

•E  -OJDOI 

c 

I  0 

I    0.001 
"5 

I  -0.003 
,■2 

§  -0.002 

-0.001 

0 

Fig.   38. — Relative  Longitudinal  Movement 
between  Bar  and  Rail  Head  at  Various  Dis- 
tances along  a  Joint  in  Laboratory  Tests. 


J 

\ 

r 

\ 

N.Y 

C.  36 

in.   Joint 

1 

\ 

k 

n*^ 

pSn 

/ 

\ 

'S 

r 

"^ 

>— 0— ( 

r 

L 

oad  = 

30  C 

)00lb 

\ 

0 

\ 

/. 

0.  24  in.  Jo 

nt 

I 

/ 

N 

A 

M 

V 

\ 

\ 

30,000  lb.  applied  at  the  middle  of  a  32-in.  span.  The  Illinois  Central  joint  had  two 
loads  of  30,000  lb.  applied  at  a  distance  of  16  in.  from  the  supports  of  a  68-in.  span. 
The  ordinates  for  these  diagrams  are  slip  (longitudinal  movement)  for  a  point  on  the 
rail  fishing  surface  with  respect  to  a  point  on  the  bar  fishing  surface  immediately  below. 
The  abscissas  are  distance  along  the  length  of  the  joint.  Values  of  the  slip  are  shown  at 
every  two-inch  interval.  A  negative  value  of  slip  indicates  movement  of  the  rail  end 
toward  the  mid-length  of  the  bar  and  a  positive  value  indicates  movement  away  from 
mid-length  of  the  bar. 

It  is  seen  from  Fig.  38  that  the  slip  or  relative  longitudinal  movement  at  the  top 
fishing  surfaces  at  the  mid-length  of  the  joint  approached  a  value  of  0.004  in.  and  is 
negative  for  both  rail  ends  and  for  both  tests.  This  location  is  the  approximate  loca- 
tion of  the  magnetic  strain  gages  in  the  field  tests.  At  four  or  five  inches  back  from  mid- 
length  the  slip  has  decreased  considerably  and  in  some  cases  it  reverses  direction.  The 
Illinois  Central  bars  were  well  worn  and  the  fit  was  apparently  not  as  uniform  as  that 
of  the  New  York  Central  bars  and  the  results  are  not  as  uniform  along  the  length  of 
the  joint. 

Two  representative  films  with  records  of  longitudinal  movement  taken  at  5  and  90 
miles  are  shown  in  Fig.  39.  Both  are  for  a  B-19,  full  bearing,  "as  is",  36-in.  joint.  The 
records  from  bottom  to  top  are  numbered  IB  to  6B  inclusive.  The  record  at  the  e.xtreme 
bottom  edge  of  the  film  is  the  timing  record  and  the  peaks  come  at  half-second  intervals 


Movements    Between    Joint    Bars   and    Rails 


211 


for  the  run  at  S  miles  per  hour  and  at  1/60-sec.  inter\'als  for  the  run  at  90  miles  per 
hour.  Record  IB  is  for  gage  position  LS,  the  longitudinal  movement  gage  on  the  receiv- 
ing rail  end,  and  record  2B  is  for  gage  position  L6,  the  longitudinal  movement  gage  on 
the  leaving  rail.  Thus  the  wheels  pass  over  position  L6  (record  2B)  before  passing  LS 
(record  IB).  Record  3B  is  the  stress  at  the  mid-length  of  the  same  joint  on  the  bottom 
flange  of  the  outer  bar  and  its  peaks  indicate  the  position  of  the  wheel  with  respect  to 
the   mid-length.  As   spacing   between   driving   wheels   is   ten   feet,   this   distance   gives   a 


_  —  o  n  O  O  O  o  n 

Compression 

i\      1     kjenslon  Stress    in    Bars 


5  m.p.h.    / 


Longitudinal/ 
IB  Ls      Movement  \ 


O   O  O    O   O  D   O 


90  m.p.h. 


0" 


TT—— 

Stress    in    Bars 
'10  OOOp.s.i. 

Run    253,0sc.B  ^        k        >  / 


0.005  in. 


2B 


1] 


\B 


LongitudinalJ 
Movement   \ 


— 'N^ 


.  t  ^  sec. 

4AAAXAAAAAAAJ 


Fig   39. — Typical  Records  of  Longitudinal  Movement  between  Bar  and  Rail 
Head  at  S  and  90  Miles  per  Hour — Also  Stress  in  Bars. 


210 


Stresses    in    Railroad    Track 


if  there  were  any  differences  in  the  action  at   the  higher  speeds  that  would  produce 
increased  wear  or  deterioration  of  the  joint. 

The  picture  of  the  action  of  the  longitudinal  movement  or  slip  in  the  joint  as  a 
whole  cannot  be  obtained  from  the  results  from  two  gages  at  the  rail  ends,  but  a  number 
of  laboratory  tests  made  previously  show  that  the  slip  takes  place  along  the  fishing 
surfaces  of  the  bars.  Coincidence  of  the  larger  values  of  slip  with  the  locations  where 
high  bearing  pressures  have  been  found  to  occur  should  determine  areas  of  greatest 
wear.  The  slip  measured  along  the  top  fishing  surface  of  a  36-in.  lOS-lb.  New  York 
Central  rail  joint  and  a  24-in.  90-lb.  Illinois  Central  rail  joint  is  shown  in  Fig.  38.  These 
joints  were  tested  in   the  laboratory.  The  New  York   Central  joint   was  loaded  with 


Distance   from  Mid-length  of  Joint   Bar  in   Incfies 
18     15       II        7        3      0     3         7        II        15     IS 


-0.004 
-0.003 
-0.002 
-ODOI 
0 
0.001 
-0.003 
-0.002 
-0.001 


Fig.   38. — Relative  Longitudinal  Movement 
between  Bar  and  Rail  Head  at  Various  Dis- 
tances along  a  Joint  in  Laboratory  Tests. 


J 

\ 

oint 

\/ 

\ 

N.Y. 

C.  36 

in.  J 

1 

I 

k 

-A 

Ln 

/ 

\ 

'N 

Y 

\ 

^-o-^ 

►— O— ( 

r 

L 

oad  = 

30  C 

■)00lb 

\ 

p 

\ 

1. 

0.  24  in.  Jo 

nt 

I 

Y 

^ 

A 

K 

V 

N 

Y 

30,000  lb.  applied  at  the  middle  of  a  32-in.  span.  The  Illinois  Central  joint  had  two 
loads  of  30,000  lb.  applied  at  a  distance  of  16  in.  from  the  supports  of  a  68-in.  span. 
The  ordinates  for  these  diagrams  are  slip  (longitudinal  movement)  for  a  point  on  the 
rail  fishing  surface  with  respect  to  a  point  on  the  bar  fishing  surface  immediately  below. 
The  abscissas  are  distance  along  the  length  of  the  joint.  Values  of  the  slip  are  shown  at 
every  two-inch  interval.  A  negative  value  of  shp  indicates  movement  of  the  rail  end 
toward  the  mid-length  of  the  bar  and  a  positive  value  indicates  movement  away  from 
mid-length  of  the  bar. 

It  is  seen  from  Fig.  38  that  the  slip  or  relative  longitudinal  movement  at  the  top 
fishing  surfaces  at  the  mid-length  of  the  joint  approached  a  value  of  0.004  in.  and  is 
negative  for  both  rail  ends  and  for  both  tests.  This  location  is  the  approximate  loca- 
tion of  the  magnetic  strain  gages  in  the  field  tests.  At  four  or  five  inches  back  from  mid- 
length  the  slip  has  decreased  considerably  and  in  some  cases  it  reverses  direction.  The 
Illinois  Central  bars  were  well  worn  and  the  fit  was  apparently  not  as  uniform  as  that 
of  the  New  York  Central  bars  and  the  results  are  not  as  uniform  along  the  length  of 
the  joint. 

Two  representative  films  with  records  of  longitudinal  movement  taken  at  S  and  90 
miles  are  shown  in  Fig.  39.  Both  are  for  a  B-19,  full  bearing,  "as  is",  36-in.  joint.  The 
records  from  bottom  to  top  are  numbered  IB  to  6B  inclusive.  The  record  at  the  extreme 
bottom  edge  of  the  film  is  the  timing  record  and  the  peaks  come  at  half-second  intervals 


Movements   Between    Joint    Bars   and    Rails 


211 


for  the  run  at  S  miles  per  hour  and  at  1/60-sec.  inter\'als  for  the  run  at  90  miles  per 
hour.  Record  IB  is  for  gage  position  LS,  the  longitudinal  movement  gage  on  the  receiv- 
ing rail  end,  and  record  2B  is  for  gage  position  L6,  the  longitudinal  movement  gage  on 
the  leaving  rail.  Thus  the  wheels  pass  over  position  L6  (record  2B)  before  passing  LS 
(record  IB).  Record  3B  is  the  stress  at  the  mid-length  of  the  same  joint  on  the  bottom 
flange  of  the  outer  bar  and  its  peaks  indicate  the  position  of  the  wheel  with  respect  to 
the  mid-length.  As  spacing   between   driving   wheels  is  ten   feet,   this   distance   gives  a 


o  o  O  O  O  o  o 


Compression 


i^J^^<sJ- 


•^^'V^A^AAy^/^ 


5  m.p.h. 


Longitudinal/ 
IB  Ls      Movement  \  _ 


o  o  Q  Q  Q  o  o 


90  m.p.h. 


^T— 

Stress    in    Bars 


10  OOOp.s.i. 


Run    253 .  Osc.  B 


■38 


0.005  in.-^ 
2B  Le 


Longitudinal^ 
IB  L^        Movement   I 


Fig   39. — Typical  Records  of  Longitudinal  Movement  between  Bar  and  Rail 
Head  at  S  and  90  Miles  per  Hour — .'Mso  Stress  in  Bars. 


212 


Stresses    in    Railroad    Track 


means  of  obtaining  the  scale  of  distance  along  the  film.  The  other  records  (4B,  5B  and 
6B)  are  stresses  on  a  joint  on  the  same  rail  one  rail  length  east.  The  vertical  scales  of 
the  records  are  given  on  the  left  and  the  directions  or  signs  on  the  right.  A  negative 
sign  denotes  movement  of  the  rail  end  toward  the  mid-length  of  the  bar  and  compressive 
stress  and  a  positive  sign  the  opposite. 

The  records  of  longitudinal  movement  or  slip  between  fishing  surfaces  of  rail  and 
bar  are  similar  in  shape  to  the  stress  records;  they  show  sharp  peaks  under  the  wheel 
load  and  reversals  in  direction  of  movement  at  points  between  the  wheels  and  have  a 
rounded  form.  The  movement  begins  at  the  time  the  joint  starts  to  take  stress,  even 
when  the  wheel  is  some  distance  from  the  joint,  and  it  reaches  a  peak  value  when  the 
wheel  is  over  the  mid-length  of  the  joint.  At  this  time  there  is  a  sudden  change  in  the 
magnitude  of  the  movement  that  is  somewhat  similar  to  the  very  rapid  change  found 


0 
■0.002 
■0.004 

0 
-0.002 
-0.004 

0 
-0.002 
-0.004 

0 


I   S  -0.002 
"^    I   -0.004 


6    .... 


Fu\l  Bearing     \ 
As    is  Machine    fit 


F-4    Bars 


Controlled    Bearing 
As   is  Machine    fit 


-I 


9L 


"J 


¥f 


7 


■fk 


A- 


Simulated    wear 


M- 


^ 


+  1"  Driver 
y.2'"'  Driver 
03"'   Driver 


^ 


Worn 


irit 


B-19  Bars 
Full  Bearing    36  in\  Full  Bearing    24  in. 

As  is  Machine   fit  Machine    fit        Simulated   wear 

4    L  i    ^ 


Simulated  wear 


I 


2L 


3-43    Head-free   Bars  T^ 

As  is 


yd^-^ 


Fig.  40. — Relative  Longitudinal  Movement  between  Bar  and  Rail  Head  for 
Various  Types  and  Conditions  of  Rail  Joints  at  5  Miles  per  Hour. 


in  the  vertical  movement  records.  On  the  leaving  rail  the  record  (record  2B)  rises  to 
peak  value,  drops  sharply,  and  then  rises  again  to  a  lower  peak  value.  The  drop  prob 
ably  occurs  as  the  rail  gap  is  crossed.  The  record  on  the  receiving  rail  (record  IB)  has 
a  similar  form  except  that  the  rise  after  the  sharp  drop-off  goes  to  a  greater  height  than 
the  initial  rise.  Also  the  sharp  drop  in  the  movement  records  corresponds  to  a  similar 
drop  in  the  stress  record  (record  3B).  This  variation  in  the  stress  record  is  not  very 
definite  in  the  reproduction  but  is  very  definite  in  the  original  record  for  the  run  at 
90  miles  per  hour. 

The  average  longitudinal  movements  for  a  speed  of  five  miles  per  hour  for  all  the 
tests  and  for  three  driving   wheels   are  shown   in   Fig.   40.  The   results   for   the   higher 


las  ^H 

lan  ^H 


Recapitulation    and    General    Discussion 213 

speeds  are  not  shown  for  the  reason  that  little  variation  with  speed  was  found.  As  the 
values  at  the  three  locations  differ  little,  the  average  value  is  plotted  in  the  figure. 

From  the  figure  it  may  be  seen  that  the  magnitude  of  all  the  longitudinal  move- 
ments is  relativel}'  small.  The  negative  sign  indicates  a  movement  of  the  rail  ends 
toward  the  mid-length  of  the  joint.  Most  of  the  values  are  0.002  in.  or  less  except  in 
the  case  of  the  worn  bars  and  those  with  simulated  wear.  The  latter  two  reach  a 
maximum  value  of  about  0.004  in.  The  worn  joints  also  show  somewhat  greater  move- 
ment than  the  "as  is"  or  the  machine  fit  joints.  A  characteristic  of  the  data  shown  is 
that  the  second  driving  wheel  (flangeless)  again  is  at  variance  with  the  other  two 
wheels.  In  this  case  the  second  wheel  gives  somewhat  greater  movement  but  not  mark- 
edly so.  The  magnitudes  of  all  the  longitudinal  movements  are  small  and  the  variation 
for  the  several  driving  wheels  is  probably  of  little  importance.  The  variation  was  nearly 
uniform  for  all  joint  locations.  The  values  are  somewhat  smaller  than  were  found  in 
the  laboratory  tests.  This  difference  is  probably  a  result  of  the  higher  bolt  tension  and 
excellent  fit  in  the  tests  in  track.  The  higher  bolt  tension  may  be  expected  to  develop 
greater  frictional  resistance  to  longitudinal  movement. 

The  results  show  the  presence  of  an  appreciable  amount  of  movement  between  bar 
and  rail  at  the  rail  ends,  which  of  course  are  positions  of  high  bearing  pressure.  The 
movement  is  sufficient  to  produce  wear  and  the  amount  of  the  movement  will  increase 
as  the  bolt  tension  drops  off  and  the  bars  wear.  Movements  of  this  nature  are  undoubt- 
edly the  source  of  much  of  the  wear  that  produces  poor  fit  and  low  joints.  Even 
extremely  minute  amounts  of  tangential  slip  were  found  by  Gough  to  cause  contact 
corrosion  and  formation  of  oxide  debris.  This  action  occurs  even  when  the  surfaces  are 
clean  or  oiled.  No  corrosion  or  much  wear  took  place  unle.-s  slip  was  present.  The  tests 
of  Gough  used  rather  small  contact  pressures  compared  with  what  may  be  expected  in 
rail    joints. 

The  excellent  fit  and  the  high  bolt  tension  may  have  partially  defeated  one  purpose 
of  the  tests  in  that  the  effects  of  speed  were  minimized.  The  form  of  the  records  and 
their  magnitude  showed  little  change  with  the  higher  speeds.  As  in  the  case  of  the 
vertical  movements  a  part  of  the  longitudinal  movement  was  observed  to  occur  in  a 
very  short  time.  Just  what  effect  this  rapidity  of  movement  may  have  on  the  wear  is 
not   known. 

20.  Recapitulation  and  General  Discussion. — Comments  and  discussion  will 
now  be  made  in  an  effort  to  bring  together  some  of  the  meanings  and  findings  in  the 
tests  of  the  rail  joints  in  track. 

It  is  well  to  visualize  the  position  of  the  principal  forces  acting  between  the  rail 
and  the  joint  bars.  For  positive  moment  (downward  bending)  (see  Fig.  21)  the  head 
of  the  rail  presses  downward  upon  the  top  fishing  surface  of  the  bar  for  a  short  dis- 
tance near  the  ends  of  both  rails,  perhaps  1  to  2  in.  just  back  of  the  rail  end  for  both 
rails,  with  the  centroid  of  the  loads  applied  at  perhaps  O.S  in.  to  1.5  in.  either  way 
from  mid-length  of  bar,  and  with  the  area  of  the  pressure  contact  dependent  upon  fit 
between  bar  and  rail.  In  acting  as  a  beam  a  closely  fitting  bar  has  two  or  generally 
four  vertical  bearing  reactions  between  its  bottom  fishing  surface  and  the  top  of  the 
rail  base  of  the  two  rails.  One  reaction  always  extends  for  some  distance  along  the  bar 
near  the  end,  and  the  second  reaction  for  each  half  of  a  bar  is  developed  for  a  short 
distance  outside  of  the  position  of  the  vertical  load  applied  by  the  head  of  the  rail. 
For  a  given  wheel  load  and  given  tie  supports  (the  magnitude  of  the  bending  moment 
developed  depending  in  a  complex  manner  upon  the  wheel  load  and  the  tie  supports 
and  upon  the  action  of  the  rail  joint),  the  magnitude  of  the  two  reactions  for  each 


214  Stresses    in    Railroad    Track 


half-length  of  bar  will  depend  upon  fit  and  stiffness  of  bar  and  particularly  upon  the 
position  of  the  interior  reactions.  Likewise  the  load  applied  by  the  rail  head  is  largely 
influenced  by  the  magnitude  of  this  interior  reaction.  As  shown  in  Article  11  "Rail 
Joints  and  Their  Action"  the  magnitude  of  this  pressure  applied  to  the  bar  by  each  rail 
head  may  have  as  great  a  calculated  pressure  as  70,000  lb.  for  a  wheel  load  of  33,000  lb. 
For  the  negative  bending  moment  generally  developed  in  front  of  and  behind  a  wheel 
the  position  of  the  loads  and  reactions  developed  between  rail  and  bar  will  be  reversed. 
The  values  of  the  negative  bending  moment,  as  found  in  tests  of  track,  may  vary  say 
from  30  to  60  percent  of  the  amount  of  the  positive  moment  developed  by  the  given 
wheel,  depending  upon  the  wheel  spacing  and  conditions  of  the  track. 

The  bearing  pressures  and  reaction  forces  apphed  to  the  joint  bars  by  the  rail  when 
the  joint  carries  load  introduce  complications  into  the  measurement  of  the  structural 
action  of  the  bars.  The  bearing  forces  and  reactions  applied  at  certain  positions  on  the 
fishing  surfaces  and  their  variable  concentration  produce  deformations  in  the  metal  other 
than  the  longitudinal  strains  considered  in  the  analysis  of  ordinary  bending  action  of 
beams,  particularly  interfering  with  the  assumption  that  the  bending  stress  varies 
directly  with  the  distance  from  the  neutral  axis.  The  effect  or  influence  of  the  additional 
forces  on  the  deformation  of  the  bars  at  gage  lines  near  the  rail  ends  was  so  indeter- 
minate as  to  make  it  impracticable  to  attack  the  problem  by  theoretical  analysis.  In- 
stead, laboratory  tests  were  made  on  joints  with  the  different  types  and  conditions  of 
bar  by  applying  known  loads  and  bending  moments  and  then  determining  by  calcula- 
tion from  the  analytical  formula  and  the  stresses  measured  at  the  gage  lines  the  value 
of  the  empirical  constant  by  which  the  moment  so  calculated  should  be  multiplied  to 
get  the  moment  actually  applied.  This  constant,  called  the  conversion  ratio,  was  deter- 
mined for  each  type  and  condition  of  bar  for  use  with  the  particular  position  of  the 
gage  lines  used  in  the  field  tests.  Although  the  method  is  empirical,  it  is  believed  that  as 
applied  to  the  track  tests  the  resulting  values  of  the  moment  so  found  are  sufficiently 
close  to  actual  values  to  warrant  their  use  in  making  comparison  of  the  action  of  the 
various  types  of  joint  bars. 

The  effectiveness  of  a  rail  joint  may  be  said  to  depend  upon  (a)  the  excellence  of 
fit  between  bar  and  rail  at  critical  points  along  the  length  of  bar;  (b)  the  stiffness  of 
the  bars  as  governed  by  the  moment  of  inertia  of  the  section  of  the  bar  with  reference 
to  the  neutral  axis  actually  obtained  in  track  service;  (c)  a  sufficiently  low  maximum 
stress  to  keep  below  an  allowable  working  stress  chosen  with  respect  to  fatigue  resist- 
ance for  the  frequencies  of  driving  wheel  loads,  heavy  truck  wheel  loads,  and  ordinary 
truck  wheel  loads,  respectively;  and  (d)  the  deflection  of  the  rail  joint  as  a  whole  as 
compared  with  the  full  rail.  Any  comparison  of  rail  joints  will  necessarily  assume  similar 
bearing  resistances  to  depression  when  the  track  is  tamped  and  fitted  to  the  actual 
camber  of  the  joints. 

For  these  track  tests  the  relative  magnitudes  of  the  moments  developed  in  the  joint 
bars  at  mid-length,  as  compared  with  the  moment  developed  in  the  full  rail  away  from 
the  joint  (for  convenience  called  the  joint  moment  ratio)  will  make  a  good  measure  of 
the  effectiveness  of  the  joint  including  its  relative  stiffness.  As  in  the  tests  no  re-tamping 
was  done  after  installation  of  different  pairs  of  joint  bars  it  will  be  necessary  to  con- 
sider the  camber  of  the  joint  in  making  comparisons  of  the  various  joints,  and  this  can 
be  done  only  in  a  general  way. 

First,  it  should  be  stated  that  the  new  bars  used  in  the  track  tests  (F-4,  B-19, 
A-39  and  B-43)  were  all  well-fitting  bars.  Probably  all  bars  fitted  the  rails  more  closely 
than  do  the  usual  run  of  joint  bars  when  new.  Nearly  all  these  bars  gave  a  joint  camber 
in  the  neighborhood  of  -f  0.010  in.  in  il  in.,  which  was  probably  more  than  the  camber 


I 


Recapitulation    and    General    Discussion  215 

of  the  original  joints  when  the  track  was  tamped  last.  With  the  great  stiffness  of  the 
rail  supports  in  this  track  (high  modulus  of  elasticity  of  rail  support)  higher  camber  in 
the  new  test  joints  added  appreciably  to  the  magnitude  of  the  moment  developed  by  the 
wheel  loads. 

It  is  evident  from  the  data  that  for  comparable  conditions  of  tests  the  heavy  and 
stiff  symmetrical  joint  bar  B-19  in  "as  is"  condition  develops  a  higher  bending  moment 
and  a  greater  joint  moment  ratio  than  the  somewhat  lighter  and  less  stiff  symmetrical 
F— 4  joint  bar  (also  in  "as  is"  condition),  the  two  kinds  of  joints  having  joint  moment 
ratios  of  essentially  0.90  and  0.80,  respectively.  Even  with  the  development  of  a  greater 
moment,  the  maximum  stresses  are  less  in  the  B-19  bar  than  in  the  F-4  bar,  compara- 
tively about  25,000  and  35,000  lb.  per  sq.  in.  Thus  the  heavier  section  develops  a 
greater  moment  with  a  smaller  stress  and  also  distributes  the  load  better  among  the  ties 
because  of  its  greater  stiffness.  As  the  joint  camber  with  both  types  of  bars  was  pre- 
sumably greater  than  that  for  which  the  track  was  last  tamped,  the  ratios  given  (0.90 
and  0.80)  are  obviously  higher  than  if  the  track  had  been  re-tamped.  For  well  tamped 
track  in  regular  condition  the  values  of  the  joint  moment  ratio  for  these  two  types  of 
joint  may  be  expected  to  be,  say,  0.85  and  0.75,  respectively.  The  values  0.90  and  0.80 
however,  may  be  used  for  comparison  under  comparable  conditions. 

The  machine  fit  bars  doubtless  gave  even  better  fit  than  the  "as  is"  bars  and 
would  be  expected  to  give  smaller  depression  and  greater  moments.  However,  as  the 
straighter  bars  gave  decreased  joint  camber  and  thus  applied  greater  pressure  to  the 
joint  ties,  the  advantages  of  better  fit  were  necessarily  nullified,  at  least  in  part,  and  no 
show  of  gain  over  "as  is"  bars  could  be  expected  in  the  tests. 

The  heavy  A-39  angle  bars  used  with  the  same  high  bolt  tension  maintained  in  all 
the  joints  (about  30,000  lb.)  and  having  about  the  same  joint  camber  as  the  B-19 
joints  show  a  joint  moment  ratio  of  0.85.  Obviously  the  high  bolt  tension  required  for 
protection  of  the  gages  was  useful  in  holding  the  neutral  axis  close  to  a  horizontal 
position.  Although  this  angle  bar  has  a  moment  of  inertia  about  a  horizontal  axis 
nearly  20  percent  greater  than  the  B-19  bars,  its  effectiveness  will  drop  off  considerably 
as  wear  progresses  or  bolt  tension  drops. 

The  joints  with  B-43  head-free  bars  with  joint  camber  similar  to  other  joints  with 
bars  in  "as  is"  condition  developed  less  moment  and  gave  a  joint  moment  ratio  of  0.65. 
They  gave  somewhat  greater  vertical  and  longitudinal  movements  between  bar  and  rail 
in  these  tests,  as  this  type  of  joint  had  given  in  previous  laboratory  tests.  The  deflec- 
tions of  the  B-^3  joints  in  the  laboratory  tests  were  also  greater  than  other  joints. 

A  comparison  of  the  tests  with  full  bearing  and  with  controlled  bearing  shows  re- 
sults that  are  similar  with  respect  to  moments  and  vertical  movements.  As  made,  the 
length  of  the  bearing  at  the  middle  of  the  bars  with  controlled  bearing,  especially  that 
at  the  bottom  fishing  surface,  was  greater  than  is  desirable  to  secure  decreased  bearing 
pressures.  Laboratory  tests  indicate  that  joints  with  controlled  bearing  are  as  stiff  as 
those  with  full  bearing.  It  is  not  known  what  difference  in  wear  would  occur. 

The  seven  joints  with  bars  ground  to  simulate  wear  (0.05  in.  at  top  in  middle,  the 
depression  running  out  at  4  and  6  in.  away)  developed  markedly  lower  moments,  and 
the  joint  moment  ratios  averaged  about  0.50  and  0.60  for  the  F-4  and  B-19  joints, 
respectively.  The  vertical  camber  of  these  joints  ranged  from  -0.006  to  -0.016  in.  One  of 
these  joints  in  a  laboratory  test  with  a  span  of  48  in.  gave  a  relatively  high  deflection. 
In  the  track  a  greater  load  was  therefore  transmitted  directly  to  the  joint  ties. 
Re-tamping   such   joints   has  little   effectiveness. 

The  moments  developed  in  the  three  F-4  joints  having  worn  bars  taken  from  track 
are  not  particularly  different  from  the  joints  with  new  bars  and  the  same  joint  camber. 


2\t)  SliesscsinRailroadTrack 


The  large  deflection  in  the  one  laboratory  test  indicates  that  in  re-tamped  track  undue 
pressure  would  be  transmitted  to  the  ties  at  the  joint  and  thus  that  the  moment 
developed  would  be  smaller  than  that  developed  with  the  new  bars. 

The  smaller  bending  moments  found  in  joints  having  bars  of  24-in.  length,  as 
compared  with  similar  bars  of  36-in.  length,  are  believed  to  be  due  to  the  effect  of  high 
compression  developed  in  the  rails  at  the  time  by  high  temperatures.  In  view  of  earlier 
tests  on  long  and  short  joints,  the  differences  in  the  bending  moments  should  not  be 
taken  as  establishing  a  superiority  in  the  longer  length  in  respect  to  ability  of  new  bars 
to  carry  bending  moment.  Further  tests  on  joints  in  track  should  be  made  under  known 
uniform  conditions.  It  should  be  kept  in  mind  too  that  these  tests  are  with  new  bars, 
and  that  little  is  known  of  relative  wear  with  different  lengths  of  bar.  Service  tests 
may  be  expected  to  give  information  of  value  on  this  point. 

Due  to  the  variability  in  the  transfer  of  load  from  one  rail  to  the  other  at  the 
higher  speeds,  definite  conclusions  with  respect  to  the  effect  of  speed  for  the  several 
types  and  conditions  of  joint  bars  can  not  be  stated.  With  the  variable  load  came 
occasional  high  stresses. 

The  vertical  and  longitudinal  movements  between  bars  and  rail  were  generally 
small,  being  0.002  to  0.003  in.  for  the  joints  with  "as  is"  and  machine  fit  bars.  One 
type  of  joint,  the  B-43  head-free,  had  somewhat  greater  movement  than  the  other  joints. 
This  result  had  been  observed  previously  in  laboratory  tests  of  the  same  kind  of  joint." 
The  joints  with  simulated  wear  gave  greatly  increased  longitudinal  and  vertical  move- 
ments at  mid-length  where  the  top  of  the  bar  had  been  ground  off.  The  joints  worn  in 
service  (F-4  CB)  gave  vertical  movements  similar  to  the  "as  is"  joints  but  the  longi- 
tudinal movements  were  somewhat  greater.  These  joints  were  only  moderately  worn. 

Little  or  no  increase  in  the  vertical  and  longitudinal  movements  with  increase  in 
speed  was  found  even  with  bars  having  simulated  wear.  This  lack  of  increase  was  prob- 
ably in  part  prevented  by  the  general  excellence  of  fit  between  bars  and  rail  and  the 
high  bolt  tension.  However,  in  some  cases,  a  considerable  part  of  the  total  vertical  and 
longitudinal  movement  was  found  to  take  place  very  quickly,  probably  an  impact  effect 
due  to  the  wheel  crossing  the  rail  gap,  which  may  be  a  source  of  joint  wear.  As  shown 
by  the  records  the  vertical  and  longitudinal  movements  generally  began  to  take  place 
while  the  wheel  was  some  distance  from  the  rail  ends  thus  preventing  the  occurrence  of 
"slap"  or  "flip"  of  the  joint  that  has  been  suggested  as  a  possible  cause  of  joint  wear. 
A  markedly  worn  joint  possibly  would  have  given  different  results  in  this  respect  and 
tests  should  be  made  on  joints  and  track  in  deteriorated  condition. 

It  is  believed  that  even  the  small  amounts  of  longitudinal  movement  measured  are 
an  important  source  of  joint  wear  because  of  the  high  bearing  pressures  developed  at  the 
locations  where  the  greatest  movements  take  place.  The  tests  of  Gough  and  Clenshaw 
corroborate  this  conclusion. 

It  may  also  be  suggested  that  any  modification  in  the  design  of  the  joint  that  de- 
creases the  stress  in  the  bar  at  its  middle,  like  a  heavier  or  stiffer  bar  or  a  greater  fishing 
height  accompanying  the  use  of  a  higher  rail,  will  decrease  longitudinal  movements 
between  bar  and  rail  and  thus  probably  decrease  joint  wear. 

All  the  measurements  taken  on  joint  bars  and  rail,  except  in  the  tests  with  rail 
batter  and  the  flat  spot  on  the  wheel,  showed  an  almost  complete  absence  of  general 
average  speed  effect  such  as  had  been  observed  in  earlier  tests  of  track  and  rolling  stock. 


rnnHl,^i^!?  o^i'^U^''^  f^^P°^^'  .^^^'^  i'''.^'^^^^'"^''    '^'o'-    ^5,    1934,    Article    7e,    "Norfolk    &    Western 
Continuous  and  Head-free  Continuous  Rail  joints  for  130-lb.  P.S.  Rail." 


Effect    of    Flat    Wheels m 

The  larger  variations  in  moment  observed  in  the  joints,  as  well  as  in  the  rail,  were 
judged  to  be  due  to  transfers  of  load  between  wheels  on  the  same  axle  of  the  locomotive. 
The  deflection  of  the  various  rail  joints  obtained  in  the  laboratory  tests  and  shown 
in  Fig.  29  may  be  considered  to  give  an  indication  of  the  relative  stiffness  of  the  joints 
and  their  ability  to  distribute  load  to  the  ties. 

V.  Miscellaneous  Tests 

21.  Effect  of  Flat  Wheels. — Wheels  of  railway  equipment  develop  flat  spots  in 
the  tread  from  various  causes  that  need  not  be  discussed  here.  The  presence  of  such 
flat  spots  is  a  source  of  expense,  annoyance,  and  in  some  cases  even  danger.  Writers 
have  developed  analyses  on  the  effect  of  flat  spots  and  variations  in  wheel  and  track 
surface  upon  depression  and  stress  in  rail,  and  some  experimental  work  has  been  done. 
The  assumptions  used  in  analyses  have  not  generally  conformed  closely  to  the  physical 
conditions  existing.  In  the  experimental  work  the  inability  of  the  mechanical  type  of 
stress  recorder  to  withstand  the  severe  impact  caused  by  a  flat  spot  and  to  record 
clearly  and  accurately  the  rapid  stress  variation  has  retarded  progress  in  the  investiga- 
tion of  the  problem.  The  magnetic  strain  fage  used  for  the  tests  here  reported  overcame 
many  of  the  instrumental  difficulties  encountered  previously  and  gave  records  that  in 
most  respects  may  be  considered  satisfactory.  Records  of  the  depression  of  the  rail  were 
also  obtained  simultaneously  with  the  stress  records,  and  these  add  value  to  the  data. 

Because  of  lack  of  familiarity  at  the  time  of  the  tests  with  the  form  and  magni- 
tude of  records  obtainable,  the  test  records  are  not  as  fully  satisfactory  as  they  could 
now  be  made.  Higher  film  speeds  and  provision  for  more  clear  space  would  have  shown 
more  clearly  the  exact  form  of  the  record  without  interference  with  other  records  on 
the  film. 

A  discussion  and  analysis  of  the  effect  of  a  low  spot  in  a  rail  or  a  flat  spot  on  a 
wheel  on  the  depression  may  be  found  in  Timoshenko's  "Applied  Elasticity",  page  334, 
and  in  "Vibration  Problems  in  Engineering"  (second  edition),  page  107.  This  analysis 
has  been  used  and  discussed  by  H.  R.  Thomas  and  N.  H.  Roy  in  Appendix  B  of  the 
"Fourth  Progress  Report  of  the  Joint  Investigation  of  Fissures  in  Railroad  Rails"."  A 
special  method  for  calculating  the  effects  of  irregularities  in  wheel  and  track  surfaces 
of  shapes  that  cannot  be  expressed  in  convenient  form  analytically  is  included  in  this 
latter  report.  Various  examples  are  calculated  and  there  are  discussions  of  applications 
of  the  methods  of  analysis  and  of  the  validity  of  the  assumptions. 

The  analyses  by  Timoshenko  and  by  Thomas  and  Roy  determine  the  depression 
of  the  wheel  and  rail  produced  by  the  vertical  movements  of  the  mass  (the  wheel  and 
the  unsprung  weight  incidental  to  it)  due  to  an  assumed  irregularity  in  the  wheel  or 
the  rail  surface.  The  rail  and  its  support  are  considered  as  equivalent  to  an  elastic 
spring.  The  wheel  is  assumed  to  maintain  contact  with  the  rail  at  all  times  and  the 
inertia  of  the  rail  and  its  support  is  neglected.  The  solutions  require  that  the  track  act 
as  a  spring  in  tension  at  times,  but  the  effect  of  the  superimposed  static  wheel  load  will 
generally  be  sufficient  so  that  the  track  will  not  actually  rise  above  its  unloaded  position. 

A  modification  of  the  analysis  of  Timoshenko  was  made,  for  the  purposes  of  this 
report,  to  determine  the  effect  which  the  car  spring  will  have  on  the  action  of  the 
vibrating  system  and  to  learn  whether  this  effect  is  of  importance.  Because  of  limita- 
tions of  space  the  derivation  of  the  modified  solution  will  not  be  given;  it  follows 
standard  methods  conforming  to  the  assumptions  of  the  problem.  The  upper  end  of  the 
spring  was  assumed  to  be  fixed,  an  assumption  not  greatly  in  error  as  long  as  oscilbtions 


"  AREA  Proceedings,  Vol.  39,   1938,  page  807. 


218  Stresses   in    Railroad   Track 


of  the  car  body  do  not  develop.  The  shape  of  the  flat  spot  is  the  form  used  by  Timo- 
shenko.  This  shape  is  not  greatly  different  from  the  usual  irregularities  present  in  wheels 
and  track.  The  applicability  of  all  these  analyses  is  limited  and  while  the  one  here 
reported  probably  offers  a  closer  approach  to  the  true  conditions  for  certain  cases  it 
still  has  some  of  the  defects  of  the  others. 

The  shape  of  the  flat  spot  or  the  low  spot  is  assumed  in  the  analysis  to  have  the 

form  given  by  the  expression,  h  sin^-Tfrt,  where  h  is  the  maximum  depth  of  the  spot, 

■I  1 
I 
Ti  =  —  where  v  is  the  velocity  of  the  car  and  I  the  length  of  the  spot,  and  t  is  the 

elapsed  time  at  any  instant  from  the  initial  contact  with  the  flat  or  low  spot.  The  ratio 

t 
-;f-  corresponds  to  the  distance  the  wheel  has  traveled  along  the  flat  spot  at  any  mstant 

expressed  in  terms  of  the  full  length  of  the  spot.  This  curve  is  horizontal  at  the  two 
ends,  a  condition  likely  to  occur  in  track. 

By  the  modified  analysis  the  deflection  or  depression  of  the  rail,  A,  due  to  the  flat 
spot  or  low  spot  (or  high  spot)   of  the  assumed  form  was  found  to  be 


-I 


2n 

cos  'ijfr 


(74) 


The  terms  T,  Ti,  and  T^  represent  natural  periods  of  the  system  and  are  given  by 
the  following  expressions: 


e(k  4-  k  1      ~  ^^^  natural  period  of  the  unsprung  weight  W,  under  the  action 
£(,1+    i)  Qf  jjjg  track  spring  of  stiffness  ki  and  the  car  spring  of  stiff- 

ness k2,  g  being  the  constant  acceleration  of  gravity. 

/ 
Ti^~  =  the  time  required  to  cross  the  spot. 

Ti^lTT  a/ =  the    natural   period    of   the   unsprung   weight   W,   considering 

'     ^  ^1  only  the  action  of  the  track  spring  of  stiffness  ki. 

The  solution  given  for  A  represents  the  added  deflection  of  the  rail  due  to  the  flat 
spot.  Since  the  track  is  assumed  to  be  an  elastic  spring  the  load  or  force  on  the  track 
will  be  proportional  to  this  deflection  and  the  moment  and  stress  at  the  point  of  appli- 
cation of  the  load  wDl  also  be  proportional  to  the  deflection.  The  spring  constant  for 
the  track  is,  of  course,  calculated  on  the  basis  of  a  single  load  on  the  track. 

The  usual  flat  spot  or  low  spot  is  of  relatively  short  length  and  the  period  of  time 
required  to  cross  it  is  correspondingly  small.  The  flat  spots  used  in  the  tests  were  about 
4  in.  in  length  and  0.11  to  0.13  in.  m  depth.  The  two  flat  spots  were  located  directly 
opposite  each  other  on  the  wheels  of  the  third  axle  of  the  heavy  car.  The  average  wheel 
load  was  26,500  lb.  Contours  of  the  two  flat  spots  are  plotted  as  full  lines  in  Fig.  41. 
The  ordinates  are  the  variation  of  the  spot  from  a  true  circular  curve  of  the  wheel 
diameter.  The  broken  Hne  curve  gives  for  comparison  a  flat  spot  of  the  shape  assumed 
in  the  analysis  having  approximately  the  same  length  and  maximum  depth  as  the 
actual  spots.  The  analytical  curve  is  seen  to  be  similar  to  the  actual  flat  spots. 

The  maximum  speed  of  the  test  runs  was  limited  to  30  miles  per  hour  because 
the  wheels  had  been  turned  down  in  service  until  the  diameter  was  reduced  from  the 
usual  33  in.  to  30J/2  in.  and  the  resulting  thickness  of  rim  was  considered  insufficient  for 
higher  speeds.  The  noise  of  the  impact  was  very  great  as  the  wheel  ran  along  the  track. 
The  minimum  speed  was  11  miles  per  hour.  At  the  time  of  the  tests  this  range  was 


1 


Effect    of    Flat   Wheels 


219 


Or^c^ 


Distance    along    Flat    Spot  in  Inches 
I  2  3 


0.05 


Q        0. 


10 


15 


"^.^ 

Analytical  — __ 

^y^ 

X 

s 

x^  ^   '•Measured 

^"^ 

==*^^ 

Fig.  41.— Profiles  of  Flat  Spots  on  the  Two  Wheels  of  Heavy  Car— 

Ordinates  Measured  from  True  Circle — Also  Assumed 

Analytical  Curve. 

thought  to  include  the  speed  for  maximum  analytical  effect.  Later  calculations  showed 
that  the  maximum  analytical  effect  with  such  a  short  flat  spot  comes  at  about  five  miles 
per  hour,  so  in  this  respect  the  data  are  deficient  for  comparison  with  the  analysis. 

Slipping  the  wheels  on  an  oiled  spot  enable  the  flat  spot  to  be  brought  nearly  over 
the  gage.  For  the  various  runs  the  longitudinal  distance  between  the  gage  and  the 
contact  of  the  flat  spot  with  the  rail  averaged  three  inches  with  a  maximum  distance  of 
six  inches.  A  still  closer  position  would  have  been  advantageous,  for  these  distances  are 
large  compared  with  the  length  of  the  flat  spot  and  will  influence  the  magnitude  of  the 
records.  It  should  be  borne  in  mind  that  at  only  one  instant  is  the  wheel  directly  over 
the  instrument  and  that  at  all  other  times  in  approaching  or  leaving  the  instrument 
location  the  values  recorded  were  influenced  by  the  manner  in  which  the  moment  at 
the  instrument  is  affected  by  the  position  of  the  wheel  and  the  flat  spot  with  respect  to 
the  instrument.  In  other  words,  only  one  point  on  the  record  can  correspond  exactly 
with  the  analytical  value.  At  other  points  the  values  are  affected  also  by  the  wheel 
position. 

Film  records  are  not  shown  for  these  flat  spot  tests.  The  variations  take  place  so 
quickly  that  some  of  the  lines  of  the  record  are  very  thin  and  would  not  survive  the 
processes  of  reproduction,  and  even  on  the  original  film  the  records  must  be  magnified 
for  study.  Fig.  42  illustrates  approximately  the  form  of  the  stress  and  depression  records. 
The  horizontal  scale  of  the  diagram  has  been  made  relatively  larger  than  on  the  film  to 
show  more  clearly  the  shape  of  the  curve.  As  the  wheel  approaches  the  instrument,  an 
increase  in  stress  was  recorded.  On  the  arrival  of  the  flat  spot  a  sudden  drop  in  stress  is 
shown,  followed  with  a  very  rapid  increase  to  a  peak  value  of  as  much  as  25,000  lb. 
per  sq.  in.  The  record  again  drops  below  a  normal  amount  (reverse  peak)  before  assum- 
ing the  usual  form  of  variation  found  for  the  other  wheels.  This  record  has  the  same 
general  form  as  the  analytical  curves. 

On  the  film  itself  the  stress  record  trace  is  very  faint  and  with  the  film  speed  used 
(about  2.5  in.  per  sec.  for  the  30  mile  per  hour  record)  its  slope  cannot  be  measured 
with  sufficient  accuracy  to  state  whether  the  rate  of  change  of  the  deflection  is  within 
the  capabilities  of  the  oscillograph  galvanometer.  The  galvanometer  is  oil  damped  and 
its  response  is  stated  to  be  almost  without  error  up  to  500  cycles  per  second,  but  the 
response  is  about  12  percent  low  at  700  cycles  and  23  percent  low  at  1,000  cycles. 
While  it  is  not  known  to  just  what  frequency  the  rates  of  change  of  the  galvanometer 
deflection  in  the  records  correspond,  the  changes  are  probably  too  rapid  for  the  gal- 
vanometer to  indicate  the  full  amount  of  the  stress  under  the  flat  spot. 

This  reduction  in  the  recorded  value  may  also  be  present  in  the  depression  records 
to  some  extent.  The  slope  of  the  rise  of  the  depression  curve  is  not  measurable  with  the 


220 


Stresses    in    Railroad    Track 


Fig.  42. — Stress  in  Rail  and  Depresion  of  Rail  as  Flat  Wheel  and 
Round  Wheel  Pass  the  Instruments. 


film  speed  used,  so  no  definite  statement  can  be  made  of  the  rate  of  change  of  depres- 
sion other  than  that  it  appears  to  be  an  instantaneous  change  as  in  the  case  of  the 
stress  records.  The  amount  of  the  increase  in  depression  due  to  the  effect  of  the  flat 
spot  may  thus  not  be  fully  indicated  on  the  film. 

The  depression  record  in  Fig.  42  is  seen  to  have  a  variation  of  form  under  the  flat 
spot  similar  to  the  stress  record,  as  might  be  expected  from  the  assumptions  of  the 
analyses  discussed.  The  rate  of  recovery  of  the  track  under  sudden  release  of  load  has 
been  a  subject  of  some  speculation.  The  depression  records  under  the  flat  spot  indicate 
that  with  the  sudden  release  of  load  the  track  springs  back  upward  an  appreciable 
amount  very  quickly;  the  depression  variations  appear  to  take  place  simultaneously 
with   the  stress  variations. 

The  peak  values  of  the  stresses  and  depressions  recorded  under  the  flat  spot  at 
gage  Location  4  are  plotted  with  respect  to  the  speed  of  the  car  in  Fig.  43.  The  stresses 
in  the  middle  of  the  base  of  the  131-lb.  RE  rail  shown  are  as  high  as  25,000  lb.  per 
sq.  in.  They  appear  to  have  a  fairly  definite  trend  with  speed  and  to  have  a  maximum 
at  about  20  to  22  miles  per  hour.  This  maximum  is  reached  at  a  speed  well  above  the 
speed  for  maximum  stress  indicated  by  the  analysis,  about  five  miles  per  hour.  The 
average  value  of  the  stress  in  rail  for  the  wheels  in  normal  condition  at  a  speed  of  11 
miles  per  hour  was  found  to  be  10,000  lb.  per  sq.  in.  The  stress  under  the  impact  load 
is  thus  lYi   times  that   for  the  wheels  in  a  normal  condition.  The  moment  developed 


Effect    of    Flat    Wheels 


221 


26 


26 


c    a.  2*4  - 


^22 


■S    Q.  20 


S    18 


<f 


16 


1       1 
O  Lett    Side 

• 

• 

.]t 

r    1 

•  Riqtit   Side 

• 

• 

V 

A 

/^ 

^ 

• 

-^ 

f^ 

•> 

r<^ 

-^ 

•/> 

o 

o 

Q 

'• 

^ 

o 

^ 

o 

10  14  18  22  26 

Speed    in    Miles    per    Hour 


30 


34 


Fip;.  43. — Stress  in  Rail  and  Depression  of  Rail  under  Flat  Wheels 
of  Heavy  Car  at  Various  Speeds. 


with  a  stress  of  25,000  lb.  per  sq.  in.  is  685,000  in.-lb.  and  for  10,000  lb.  per  sq.  in.  is 
275,000  in.-lb. 

The  modified  analysis  with  the  assumptions  used  predicts  a  maximum  increase  in 
rail  depression  due  to  the  flat  spot  of  1.35  times  the  depth  of  the  spot.  Since  the  depth 
was  about  0.13  in.,  this  factor  makes  the  increase  in  depression  0.18  in.,  which  cor- 
responds to  an  increase  in  load  of  about  41,000  lb.  for  the  test  track  with  a  modulus 
of  2,500  lb.  per  in.  per  in.  This  load  is  calculated  on  the  basis  of  a  single  wheel  load 
on  the  rail.  The  maximum  increase  of  load  would  give  a  total  maximum  moment, 
including  the  static  effect  of  the  wheel  load,  of  about  710,000  in.-lb.  at  the  flat  spot. 
This  calculated  moment  is  somewhat  in  excess  of  that  found  from  the  test  results  but 
the  difference  may  be  due  in  part  to  the  lack  of  full  indication  of  peak  stresses  by  the 
galvanometers  and  also  to  the  flat  spot  contact  not  coming  exactly  at  the  instrument. 

The  values  for  the  rail  depression  in  Fig.  42  show  trends  similar  to  those  found 
with  the  stresses.  The  maximum  values  occur  at  about  22  miles  per  hour  and  arc 
less  at  both  higher  and  lower  speeds.  In  this  respect  the  findings  for  both  depressions 
and  stresses  are  similar  to  the  results  of  the  analyses.  The  maximum  depressions  arc 
■seen  to  be  about  0.22  in.  with  a  few  values  up  to  0.24  in.  The  depressions  previously 
recorded  for  this  location  with  normal  wheels  were  about  0.18  to  0.20  in.,  making  an 
increase  of  considerable  amount.  The  calculated  depression  for  a  normal  wheel  is  about 
0.15  in.  not  considering  the  effect  of  play. 

It  is  clear  from  these  data  and  a  consideration  of  the  conditions  involved  that 
the  assumptions  of  the  analyses  are  not  fulfilled  in  several  important  respects.  The  most 


222       Stresses    in    Railroad    Track 

important  defect  in  the  assumptions  probably  is  that  the  wheel  fails  to  maintain  con- 
tinuous contact  with  the  rail  and  that  when  it  again  contacts  the  rail  there  is  con- 
siderable impact  effect  which  makes  the  action  much  more  complicated  and  possibly 
more  severe  than  would  be  found  with  continuous  contact.  The  likelihood  of  loss  of 
contact  is  discussed  by  Thomas  and  Roy  with  the  assumption  of  no  uplift  of  the  rail 
during  loss  of  contact.  The  depression  records  of  these  tests  show  that  the  rail  does 
rise  toward  the  wheel  very  quickly.  However,  the  very  small  amount  of  downward 
movement  of  the  wheel  possible  in  the  time  available  makes  it  unlikely  that  contact 
will  be  maintained.  The  loud  noise  or  slap  accompanying  the  running  of  the  flat  wheel 
tends  to  corroborate  this   conclusion. 

It  is  not  known  how  much  mass  should  be  considered  to  act  in  the  rail  and  track. 
There  is  a  considerable  mass  that  has  movement  of  greater  or  lesser  amounts  and  the 
inertia  forces  involved  may  be  an  important  factor  in  the  action. 

It  is  assumed  in  the  analyses  that  the  shape  of  the  depression  curve  and  distribution 
of  the  stresses  and  depressions  along  the  rail  are  not  affected  by  the  very  rapid  action 
in  any  way  that  changes  the  relation  between  load  and  stress  and  depression.  A  differing 
relation  has  been  found  by  R.  N.  Arnold'*  to  be  a  very  important  matter  where  the 
action  is  very  rapid.  It  may  cause  serious  error. 

The  presence  of  stresses  as  high  as  25,000  lb.  per  sq.  in.  in  a  131-lb.  rail  (moment 
of  685,000  in.-lb.)  indicates  the  presence  of  very  large  forces,  and  since  the  rapidity 
of  the  changes  in  stress  is  probably  greater  than  the  oscillograph  galvanometers  will 
record  accurately  the  values  registered  are  thought  to  be  lower  than  the  actual  values. 
Further  experimental  work  along  this  line  would  be  of  value  and  could  be  more  wisely 
conducted  through  experience  gained  in  these  exploratory  tests.  It  would  be  desirable 
to  use,  if  possible,  instruments  adapted  to  accurate  registration  of  even  higher  fre- 
quencies of  stress  than  the  magnetic  strain  gage  equipment  of  these  tests. 

22.  Effect  of  Batter  in  the  Rail  Surface. — Batter  in  the  rail  surface  is  one  of 
the  principal  detrimental  features  that  develop  at  the  rail  joints  in  track  under  service. 
As  it  was  not  practicable  to  obtain  joints  from  service  with  batter  developed  to  the 
extent  desirable  for  test  purposes,  the  rail  surface  at  a  joint  and  at  places  on  two  rails 
away  from  a  joint  was  ground  to  a  shape  similar  to  that  found  in  service,  and  records 
were  made  of  the  stresses  in  the  joint  bars  and  the  stresses  and  depressions  in  the  full 
rail  under  these  conditions  of  batter.  This  batter  constitutes  an  irregularity  in  track 
such  as  was  intended  also  to  be  covered  by  the  analyses  discussed  in  Article  21. 

The  surface  at  the  rail  ends  at  joint  location  1  was  first  ground  to  a  maximum 

depth  of  0.025  in.  at  the  rail  gap,  sloping  back  uniformly  to  nothing  at  a  distance 

of  2  in.  on  the  leaving  rail  and  4  in.  on  the  receiving  rail,  making  a  total  length  of  6  in. 

of  batter.  A  similar  batter  spot  was  ground  in  the  right  rail  at  gage  Location  5.  These 

batter  spots  will  be  termed  shallow  six-inch  batter.  After  tests  were  made  with  shallow 

batter,  the  depth  of  batter  at  the  rail  gap  and  in  the  full  rail  was  increased  to  0.050  in., 

sloping  to   nothing  in  3-in.  on  the  leaving  rail  and   6-in.   on  the   receiving  rail.  This 

batter  spot  will  be  termed  deep  nine-inch  batter.  Later  the  length  of  the  batter  spot 

at  both  the  joint  and  the  full  rail  was  increased  to  36  in.,  vidth  the  maximum  depth 

of  batter  kept  at  0.050  in.  and  symmetrically  disposed  with   respect   to  the  rail  gap 

and  a  point  in  the  rail;  this  is  termed  the  deep  36-in.  batter.  Batter  was  also  ground 

wt 
into  the   left   rail   at    rail   location    6   to    conform   to    the    expression   y  =  h   sin"  -t^; — ' 

'"'Impact  Stresses  in  a  Freely  Supported  Beam"  by  R.  N.  Arnold.  (B.Sc.  Ph.D..  M.S.),  A.M.I. 
Mcch.  E.,  Proceedings  Institution  of  Mechanical  Engineers,  Vol.   137,  1937,  part  3,  page  217. 


Effect   of   Batter   in    the    Rail    Surface 


223 


leo 

160 


140 


2  120 
•S  100 
^  80 
I   160 

s 

5  140 
o 

*"  120 
.c 

^  100 
I  80 
S   160 

Q: 

100 

80 


1      1      1      1      1      1      1      1 

Joint  Location  1 — F-4  Worn   Joint 

1      1      1      1      1 
Right  Rail   Location   5 

1     1     III     1     1 

Deep  (.050 in.)  9-m.   batter 

Traffic 

, 

— 

-^ 

■ 

A 

1 

^ 





r" 

- 

\ 

/ 

A 

/ 

/ 

' 

/ 

\ 

/ 

Jo 

hi  L 

ocati 

jn  1- 

1         1         1 
—  F-4   Worn    Joint 

1       1        1 
Right  Rail  Location    5 

s 

Dei 

'PU 

)50 

'n. 

. 

"ie-ir 

.  batter 

N 

V 

^ 

^ 

^ 

\^ 

y 

^ 

X 

S 

y 

y 

^ 

\ 

y 

/ 

N. 

^ 

Left  Rai 

Lo 

zafioi 

7    6 

8 -in.  by  s  in.  batter 

" 

--- 



— - 

\ 

( 

\ 

\ 

1 

le    I?    8 


0      4      8      12     16     16     12     8      4      0 
Distance   along   Rail  in   Inches 


8      12     16 


Fig.  44. — Profiles  of  Batter  Spots  Ground  into  Rail. 

(a  shape  assumed  in  the  analyses)   where  h  is  maximum  depth,  Ti  the  period  of  time 

required  to  cross  the  batter  spot,  and  t  the  time  elapsed  from  the  first  contact  of  the 

t 
wheel   with   the   batter   spot.  The   ratio— ^;:-corresponds   to   the   distance   the   wheel   has 

traveled  along  the  batter  at  any  instant  expressed  in  terms  of  the  full  length  of  the 
batter  spot,  h  was  made  1/16  in.  and  the  length  of  the  batter  spot  was  8  in.  This 
batter  spot  is  termed  the  8-in.  by   1/16-in.  batter  spot. 

The  measured  profiles  of  the  deeper  forms  of  batter  are  shown  in  Fig.  44.  It  may 
be  noted  that  the  nine-inch  batter  is  not  a  symmetrical  curve  and  in  this  respect  does 
not  conform  to  the  curves  assumed  in  the  analyses.  All  the  batter  curves,  (except  the 
8-in.  by  l/16-in.  batter)  are  also  not  continuous  curves  as  was  also  assumed  in  the 
analyses.  The  meeting  of  the  two  sloping  sides  of  the  batter  gives  a  point  of  discon- 
tinuity in  the  batter.  These  differences  between  the  analytical  and  the  test  conditions 
may  be  expected  to  affect  the  agreement  of  the  test  results  and  analytical  values 
somewhat. 

The  tests  made  with  rail  joints  without  batter  showed  that  the  gap  between  the 
rail  ends  affects  the  form  of  the  records  in  many  cases  so  that  the  form  of  the  records 
taken  with  joints  having  batter  will  also  be  influenced  by  the  rail  gap. 

It  should  be  borne  in  mind  that  the  instruments  recording  the  stresses  and  depres- 
sions in  the  batter  tests  are  attached  to  the  rail  or  the  joint  bars,  and  thu?  the  position 
of  a  moving  wheel  is  varying  continuously  with  respect  to  the  batter  spot  and  to  the 
instrument   position.  The  analysis  deals   with    the   values  at   the   wheel   position   as   it 


224 


Stresses    in    Railroad   Track 


proceeds   across   the   batter   spot    and   thus   the    recorded   values   will    not   be    identical 
with  the  analytical  values  under  the  test  conditions. 

Less  slap  or  noise  was  produced  when  the  wheels  passed  over  the  batter  spots 
than  was  produced  by  the  flat  spot.  Speeds  as  high  as  90  miles  per  hour  over  the 
batter  spot  did  not  cause  undue  disturbance.  The  surface  of  the  rail  was  chalked  at 
the  8-in.  by  l/16-in.  batter  spot.  The  chalk  was  found  to  be  removed  in  a  path  over 
the  full  length  of  the  batter  spot  even  at  a  speed  of  90  miles  per  hour.  This  is  an 
indication  of  the  probability  of  continuous  contact  over  this  batter  spot  by  any  wheel, 
even  though  all  wheels  passed  over  it.  Although  at  the  high  speeds  a  wheel  will  not 
drop  or  be  forced  into  the  batter  spot  before  it  is  well  beyond  the  middle  of  the 
length,  the  upward  recoil  of  the  rail  may  be  fast  enough  to  account  for  nearly 
continuous  contact. 


t"?^.  O.C)  Ooo 

i 

1  : 

O  O 

o  o 

\     10  000  p.s.i.      ^  -yr      ^  sec.    -h\- 

1 1  U  U  A  A  U  lAlMMriiMUJLi  A  1  U  A  M  «  A  A  Ji.litMiit  H  I  li  AA  A  A  A  I.  A^LA  Id 


Deep    9-in.      ^W^. 
batter       y^        'S^ 


Rail 
Depression 

No    batter    / 


Run   553,050.  B      GOm.p.li. 

^  .10  000 p.s.i. 

3B,  ,  A  /\l[ 


^^^.^^ 


No   batter 


'\M. 


,  .Rail    Stress^        r  ^Deep  9-in.   batter 


\^r~/\ir 


Fig.  45. — Typical  Records  of  Stress  and  Depression  for  Deep  9-in.  Batter  Spot 
at  a  Rail  Joint  and  in  Full  Rail  at  60  Miles  per  Hour. 


Effect    of    Batter    in    the    Rail    Surface 


225 


Since  the  records  taken  for  the  batter  spots  were  somewhat  clearer  and  easier  to 
interpret  than  those  for  the  flat  spots  some  representative  records  are  shown  for 
comparison  and  study.  In  Fig.  45  are  shown  the  records  of  stress  and  depression  for 
the  deep  9-in.  batter  for  the  locomotive  and  car  at  60  miles  per  hour,  the  highest  speed 
run  with  the  car.  The  upper  film  is  from  oscillograph  A  and  the  records  are  numbered 
from  lA  to  4A  inclusive.  All  records  in  this  film  (except  the  60  cycle  timing  wave  at 
the  extreme  bottom  edge)  are  stresses  in  the  bars  of  an  F— i  worn  joint  at  Joint  Loca- 
tion 1  and  the  records  in  order  from  bottom  to  top  are  gage  hnes  C  (see  Fig.  25  for  loca- 
tion of  gage  lines)  at  the  bottom  of  the  outer  and  inner  bars  respectively  and  gage  lines  B 
at  the  top  of  the  outer  and  inner  bars  respectively.  The  lower  film  has  records  of  the 
stress  in   the   base   of  the   right   rail   at   gage   Location   5   with   deep   9-in.   batter    (IB) 


iJI 


C  )  O  O  r.   r,     kw 


o  o 


Stresses    in 
Joint  Bars 


4A 


Deep    36-in.   batter 
at    Joint 

^ J 


j^m^ 


2A 


■Tension  '  ! 

Run   5/6,  Osc.  A             {''   \'*^  ^--Tension  i  i                    / 

it       ;''    ^'             1  '  (                    i' 
eOm.p.h.         k     \       \ 


10000  p.s.i. 


lA 


M I '  1 1 1  u  1  iiMimmmH  > 


Deep  36-in. 
batter 


Run   576.0SC.B 


^^8-in.  by   j-^  in.  batter 


38 


60m. p.h. 


10  000  p.s.i. 


Rail   Stress 

■Mj^jjJ'JCj 


Rail   Stress    ^  ^  q^^  ^^-in. 
/  I    batter 


Fig.  46. — Typical  Records  of  Stress  and  Depression  for  Deep  .^6-in.  Batter 

Spot  at  a  Rail  Joint  and  in  Full  Rail— Also  S-in.  by  1/16-in.  Batter  in 

Full  Rail  at  60  Miles  per  Hour. 


226 Stresses    in    Railroad    Track 

and  in  the  base  of  the  left  rail  at  gage  Location  5   with  no  batter   (3B);  4B  is  the 

depression  of  the  left  rail  with  no  batter  and   5B  is  the  depression  for  the  right  rail 

with  the  deep  9-in.  batter.  In  Fig.  46  is  shown  a  set  of  records,  also  at  60  miles  per 

hour,  with  the  test  conditions  similar  in  all  respects  except  that  the  deep  9-in.  batter 

has  been  lengthened  to  36  in.  and  records  3B  and  4B  are  now  stress  and  depression 

records  for  the   Gage  Location   6  on  the  left  rail  with   the  8-in.  by   1/16-in.  batter  of 

irt 
the  form  denoted  by  the  expression  h  sin^-^^r. 

It  will  be  seen  that  the  records  for  the  batter  tests  are  similar  in  form  to  the  sketch 
shown  for  the  fiat  spot  record  (see  Fig.  42).  However,  the  original  records  show  that 
the  rates  of  change  of  stress  and  depression  as  the  wheel  crosses  the  batter  are  less 
than  with  the  flat  spot,  though  the  changes  in  the  records  for  the  batter  spot  are  still 
quite  rapid  due  partly  to  the  higher  speeds  used.  The  test  speeds  were  as  high  as  90 
miles  per  hour  for  the  batter  tests.  The  gap  at  the  rail  ends  introduces  an  additional 
effect  in  the  records  for  joint  bars  (records  lA  to  4A,  Fig.  45).  This  effect  can  be  seen 
by  comparing  the  shape  of  the  records  for  the  joint  with  those  for  the  full  rail  (records 
IB  and  3B,  Fig.  45).  The  records  for  the  locomotive  wheels  in  some  instances  have 
forms  differing  somewhat  from  those  for  the  car  wheels;  the  car  wheel  records  are 
quite  consistent  in  form  but  vary  in  magnitude.  There  is  generally  an  initial  decrease 
of  the  stress  or  the  depression  as  the  wheel  first  reaches  the  batter  and  then  a  very 
quick  rise  followed  by  a  fairly  rapid  drop  to  resume  the  normal  shape  for  an  unbattered 
rail.  Comparisons  of  form  can  be  made  by  reference  to  record  3B  in  Fig.  45,  which  is 
for  the  full  rail  without  batter.  Some  of  the  difference  in  the  form  of  the  records  for 
the  locomotive  and  the  car  may  have  been  due  to  differences  in  the  contact  on  the 
batter  spot  of  the  large  locomotive  wheels  and  the  small  car  wheels. 

The  records  shown  in  Fig.  46  for  the  tests  with  the  deep  36-in.  batter  for  the 
joint  and  the  rail  are  chiefly  of  interest  in  that  almost  all  of  the  difference  of  form 
of  the  stress  and  depression  records  observed  for  deep  9-in.  batter,  when  compared 
with  full  rail  records,  has  been  eliminated  or  very  greatly  decreased  by  lengthening  the 
batter.  The  magnitude  of  the  stresses  and  depressions  has  also  been  decreased  as  will 
be  shown  later.  The  lengthening  of  the  batter  has  decreased  the  impact  and  speed 
effect  and  has  also  decreased  the  vibrations  developed. 

It  may  be  seen  from  the  records  for  the  batter  tests  that  a  wheel  crossing  the 
batter  spot  causes  very  rapid  changes  of  stress  and  depression,  as  is  indicated  by  the 
steepness  of  the  slopes  of  the  lines  of  the  record  and  their  relatively  lesser  weight.  It  is 
possible  that  these  changes  were  so  fast  that  the  galvanometers  did  not  record  the  full 
height  of  the  peak  values.  However,  it  is  judged  from  examination  of  the  records 
that  the  changes  were  less  rapid  than  in  the  tests  of  the  flat  spot  and  the  indications 
for  the  batter  tests  are  therefore  probably  more  nearly  correct  than  for  the  tests  with 
the  flat  spot.  It  should  be  stated  that  since  the  galvanometers  are  critically  damped, 
their  indications  will  be  less  than  the  full  amount  when  the  changes  become  too  rapid. 

The  bending  moments  in  the  rail  joint  and  in  the  full  rail  at  the  batter  spots 
developed  by  the  three  driving  wheels  of  the  locomotive  are  shown  in  Fig.  47.  For  the 
deep  9-in.  batter  at  a  speed  of  15  miles  per  hour  the  moment  in  the  joint  is  about 
380,000  in.-lb.  With  the  batter  extended  to  36  in.  the  moment  developed  has  decreased 
to  about  325,000  in.-lb.  However,  with  the  deep  9-in.  batter  the  moments  drop  off 
somewhat  as  the  speed  is  increased.  With  the  deep  36-in.  batter  the  change  in  moment 
in  the  joint,  as  the  speed  increases,  is  first  one  way  and  then  another  with  a  possible 
peak  at  SO  or  60  miles  per  hour.  It  has  been  found  that  variation  in  the  action  of  the 
locomotive  at  or  above  60  miles  per  hour  causes  large  changes  in  the  moment  developed 


Effect    of    Batter    in    the    Rail    Surface 


227 


500 


Moments    in    Rail  Join! 


300 


.c 


70  90  30  50 

Speed    in    Miles  per   Hour 

Fig.  47.— Bending  Moments  Developed  at  the  Batter  Spots  in  the  Rail  Joint  and  P'ull 
Rail  by  the  Three  Driving  Wheels  of  Locomotive  4779. 


230  Stresses    in    Railroad   Track 

The  moments  developed  by  the  car  at  60  miles  per  hour,  shown  in  Fig.  48,  are 
seen  to  be  somewhat  at  variance  with  the  trends  at  the  lower  speeds  and  are  also 
erratic  for  some  wheels  both  for  the  rail  joint  and  the  full  rail.  The  moments  at  60 
miles  per  hour  for  most  of  the  tests  made  at  Gage  Location  5  show  points  of  similarity. 
It  appears  likely  that  some  action  of  the  car  is  a  principal  factor  in  the  variability, 
one  of  the  outstanding  examples  being  the  large  moment  developed  by  the  third  wheel 
at  60  miles  per  hour  in  several  instances  when  the  other  wheels  show  a  large  decrease 
in  moment. 

It  will  be  noted  that  in  all  tests  the  first  car  wheel  develops  markedly  less  moment 
than  the  others.  This  wheel  has  relatively  heavy  wheel  loads  immediately  ahead  and 
behind  it  and  thus  gets  a  greater  negative  moment  (helping  effect)  from  these  adjacent 
wheels  than  do  the  other  car  wheels. 

Comparison  of  the  moment  diagrams  for  the  joint  and  the  full  rail  for  tests  with 
the  deep  9-in.  batter  and  with  the  deep  36-in.  batter  shows  that  the  two  kinds  of 
batter  have  a  similarity  in  their  variations  in  moment  with  speed  for  both  joint  and 
rail  up  to  a  speed  of  SO  miles  per  hour,  above  which  the  car  itself  apparently  develops 
some  action  that  is  the  governing  factor  in  the  magnitude  of  the  moment  developed 
at  a  given  location. 

The  moments  developed  at  the  shallow  six-inch  batter  spot  are  not  shown;  they 
are  similar  in  form  to  those  for  the  deep  nine-inch  batter  but  of  somewhat  lesser  mag- 
nitude. The  car  was  not  run  for  the  shallow  nine-inch  batter  tests,  so  values  are  avail- 
able only  for  the  locomotive. 

The  form  of  the  records  of  the  depression  of  the  rail  for  the  batter  tests  may  be 
seen  in  Figs.  45  and  46  and  may  be  compared  to  a  record  on  the  same  film  for  a  rail 
that  has  no  batter.  It  is  apparent  from  the  diagrams  that  the  batter  caused  changes  in 
the  form  of  the  depression  records  as  compared  to  those  for  the  rail  with  no  batter. 
Greater  depressions  were  also  found  with  batter  in  the  rail  than  with  no  batter  at  the 
identical  gage  location.  Under  the  car  the  average  depression  was  about  O.IS  in.  with 
no  batter,  0.17  in.  with  deep  9-in.  batter,  0.16  in.  with  deep  36-in.  batter,  and  0.26  in. 
with  8-in.  by  l/16-in.  batter.  The  increases  of  depression  under  the  locomotive  driving 
wheels  due  to  batter  were  somewhat  greater.  The  average  depression  was  about  0.15  in. 
with  no  batter,  0.20  in.  with  deep  9-in.  batter,  and  0.28  in.  with  8-in.  by  l/16-in. 
batter.  Despite  the  fact  that  the  batter  increased  the  depression  of  the  rail  over  that 
found  with  no  batter,  there  was  little  increase  in  the  maximum  depression  at  the 
higher  speeds  in  the  tests  with  batter,  such  as  was  observed  with  the  flat  spot.  However, 
since  the  effect  of  the  batter  was  considerably  less  than  the  effect  of  the  flat  spot,  any 
changes  in  depression  caused  by  speed  may  be  expected  to  be  less  noticeable  for  the 
batter  tests. 

The  depressions  of  the  rail  for  the  tests  with  batter  are  not  given  in  detail 
because  of  the  lack  of  appreciable  change  with  speed.  The  form  of  the  records  may  be 
observed  in  the  films  shown.  The  general  values  given  in  the  foregoing  discussion  are 
considered  sufficient  for  the  purpose. 

Comparison  may  be  made  between  the  test  results  and  the  values  calculated  by 
the  modified  analysis,  discussed  in  Art.  21  "Effect  of  Flat  Wheel",  which  consider  the 
effect  of  the  car  spring.  The  calculated  effect  of  the  car  spring  is  to  decrease  somewhat 
the  magnitude  of  the  maximum  effect  of  the  batter  over  that  calculated  without  con- 
sideration of  the  spring.  The  amount  of  this  decrease  is  about  ten  percent.  The  com- 
parisons will  be  made  with  test  results  from  the  loaded  car  for  the  full  rail  because  the 
results  for  the  rail  joint  are  affected  by  other  factors  besides  the  batter. 


Effect    of    Batter   in    the    Rail    Surface 23^ 

The  speed  calculated  from  the  formula  at  which  the  deep  9-in.  batter  would  have 
the  maximum  effect  is  about  9  miles  per  hour,  and  the  depression  due  to  the  batter 
alone  was  calculated  to  be  1.35  times  the  depth  of  the  batter.  As  the  depth  of  the 
batter  was  0.050  in.  the  calculated  depression  caused  by  the  batter  alone  is  0.068  in. 
This  depression  may  be  expressed  in  terms  of  load.  Considering  the  stiffness  of  the 
track,  it  will  be  equivalent  approximately  to  a  lS,000-lb.  load  in  addition  to  the  static 
wheel  load.  This  added  load  was  calculated  on  the  basis  of  a  single  concentrated  load 
on  track  with  a  modulus  of  2,500  lb.  per  in.  per  in.  The  added  load  would  develop 
a  total  calculated  moment  of  about  400,000  in. -lb.,  considering  the  weight  of  the  car 
and  the  effect  of  an  adjacent  wheel.  The  moments  shown  in  Fig.  48  for  the  deep  9-in. 
batter  are  seen  to  be  between  350,000  and  400,000  in.-lb.,  a  fair  agreement  with  the 
calculated  value. 

The  test  results  indicate  that  the  maximum  effect  of  the  9-in.  batter  occurred  at 
about  25  miles  per  hour,  a  speed  considerably  above  the  calculated  speed.  This  disagree- 
ment may  be  the  result  of  some  loss  of  contact  in  crossing  the  batter  despite  the 
probability  of  continuous  contact  indicated  by  the  track  of  the  wheel  through  the 
chalk  as  discussed  previously. 

The  analytical  speed  for  maximum  effect  of  batter  for  the  deep  36-in.  batter  is 
35  miles  per  hour  and  the  test  results  gave  maximum  moments  at  about  35  to  SO  miles 
per  hour,  which  is  considered  a  good  agreement.  However,  the  analysis  gives  the  same 
increase  in  load  as  for  the  9-in.  batter,  because  the  greatest  depth  of  batter  is  identical, 
the  calculated  maximum  being  at  a  higher  speed  for  the  36-in.  batter  than  for  the  9-in. 
batter.  The  calculated  total  moment  of  about  400,000  in.-lb.  for  a  wheel  is  seen  from 
the  diagram  to  be  considerably  greater  than  the  maximum  moments  found  for  the  36-in. 
batter,  which  were  in  general  about  275,000  to  310,000  in.-lb. 

From  the  closer  agreement  between  some  of  the  test  and  the  calculated  values  it 
seems  probable  that  the  assumptions  of  the  analysis  were  more  nearly  fulfilled  in  the 
batter  spot  tests  than  in  the  flat  spot  tests,  especially  in  regard  to  the  assumption  of 
continuous  contact  of  the  wheel  on  the  rail.  The  batter  spots  were  all  of  greater  length 
and  lesser  depth  than  the  flat  spot,  both  conditions  being  favorable  to  maintenance  of 
contact.  If  contact  is  lost  the  force  in  the  car  spring  and  the  track  reaction  are  no 
longer  in  equilibrium  and  accelerations  are  imparted  to  the  wheel  and  track  that  may 
be  expected  to  increase  the  severity  of  the  action  when  contact  is  again  established. 

The  grinding  of  the  deep  9-in.  batter  to  a  length  of  36  in.  to  lessen  the  slopes  of 
the  batter  spots  gave  a  definite  decrease  in  the  stress  developed  by  the  car  wheels. 
The  lengthening  of  the  batter  also  decreased  the  rail  vibrations  as  shown  by  the  smoother 
records  obtained.  The  grinding  out  to  a  longer  length  has  been  tried  in  service  by  one 
railroad  to  decrease  the  detrimental  effect  of  the  batter  at  the  rail  joints  but  the  results 
are  not  known.  However,  it  should  be  stated  that  the  stresses  were  materially  increased 
by  the  presence  of  batter  of  all  forms  in  both  the  full  rail  and  the  rail  joint. 

The  rail  depressions  with  batter  in  the  rail  were  also  found  to  be  greater  than 
without  the  batter.  The  8-in.  by  1/16-in.  batter  caused  the  largest  increase  in  depression 
and  the  deep  36-in.  batter  the  smallest,  with  the  deep  9-in.  batter  intermediate  between 
the  two.  The  higher  speeds  caused  httle  or  no  addition  to  the  depression,  as  compared 
with  the  lower  speeds,  even  though  the  stresses  observed  at  the  same  locations  showed 
material  changes.  The  reason  for  this  lack  of  speed  effect  upon  the  depression  is  not 
known,  though  it  is  possible  that  the  changes  were  small  relative  to  the  total  amount 
of  the  depression  and  thus  are  not  readily  recorded. 

Tests  were  also  made  with  two  wheels  mounted  eccentrically  on  an  axle  of  the 
heavy  car.  The  eccentricity,  which  was  1/16  in.  or  less,  was  apparently  too  small  to 


232  Stresses    in    Railroad    Track 

show  an  appreciable  effect  on  the  stresses  and  depressions  of  the  rail,  and  the  results 
will  not  be  given.  Out-of-round  wheels  have  been  found  to  cause  track  damage.  Tests 
on  the  effect  of  this  not  unusual  condition  may  well  be  included  in  a  future  program. 
As  previously  stated,  the  tests  with  flat  spots  and  batter  were  undertaken  in  a 
preliminary  way  largely  to  learn  whether  the  testing  equipment  available  would  be 
satisfactory  for  determining  the  effect  of  such  conditions  on  the  stresses  and  depres- 
sions developed  in  the  rail.  The  apparatus  was  found  to  give  rather  definite  and  con- 
sistent information.  Besides,  despite  the  short  time  taken  in  making  the  tests,  it  is 
believed  that  the  data  obtained  have  given  significant  indications  of  the  magnitudes 
and  trends  of  the  stresses  produced  by  the  flat  spot  and  the  batter  spots. 

23.  Rail  Stresses  and  Depressions  With  Steam  Locomotive. — Tests  were 
made  with  steam  locomotive  No.  6718,  a  fast  freight  locomotive  of  the  Mia  class, 
(4-8-2),  to  study  effects  of  counterbalance,  as  it  existed  in  a  steam  locomotive,  on  the 
stresses  developed  in  the  base  of  the  rail  and  the  corresponding  depressions  of  rail. 
The  spacing  of  the  wheels,  the  normal  wheel  loads  and  other  data  of  the  locomotive 
are  given  in  Fig.  3.  Other  information  is  likewise  given  in  Article  6  "Locomotives 
and  Cars". 

In  these  tests  the  magnetic  strain  gages  were  mounted  on  the  center  line  of  the 
base  of  the  two  rails  at  gage  locations  4,  S  and  6,  spaced  at  10-ft.  intervals,  the  gages 
on  one  rail  being  directly  opposite  corresponding  ones  on  the  other  rail.  Six  solenoid 
depression  gages  to  record  depression  of  the  rail  with  reference  to  a  support  fixed  in 
the  roadbed  were  also  mounted  on  the  two  rails  at  the  three  gage  locations.  Thus  the 
strain  gage  and  the  depression  gage  of  each  gage  location  recorded  stress  and  depression 
measurements  simultaneously. 

For  the  one  day  of  testing  with  this  locomotive  23  runs  were  made,  3  runs  at  5 
miles  per  hour  and  20  runs  at  75  miles  per  hour.  The  stresses  in  the  base  of  rail 
developed  under  speeds  of  five  miles  per  hour  are  considered  to  be  due  only  to  static 
loads,  this  low  speed  producing  negligible  dynamic  effects.  All  three  of  the  runs  at  five 
miles  per  hour  were  made  prior  to  any  run  at  the  higher  speed. 

In  all  runs  steam  was  shut  off  as  the  locomotive  approached  the  test  section  of 
track,  and  the  locomotive  drifted  past  the  gages.  The  speeds  were  read  from  the 
speedometer  in  the  cab  of  the  locomotive  and  checked  against  the  speeds  given  by 
the  timing  wave  on  the  oscillograph  records. 

The  position  of  the  counterweight  as  the  locomotive  passed  over  a  gage  location 
was  recorded  photographically.  It  was  found  unnecessary  to  control  the  position  of  the 
counterweight  on  different  runs  as  the  starting  and  stopping  of  the  locomotive  and  the 
running  over  curves  within  the  length  of  runs  gave  considerable  distribution  of  position 
of  counterweight   with   respect   to   any   one   instrument. 

In  Table  11  are  given  the  weights  of  the  reciprocating  and  rotating  parts  of  the 
Class  Ml  Locomotive  with  counterbalance  weight  and  weight  placed  in  each  wheel 
for  reciprocating  parts  as  reported  by  the  Mechanical  department  of  the  Pennsylvania 
Railroad. 

For  the  possible  benefit  of  some  readers,  the  methods  of  calculation  and  the  com- 
parison of  measured  data  will  be  treated  at  somewhat  greater  length  than  would  be 
desired  by  other  readers.  In  order  to  fully  interpret  the  stress  measurements,  it  was 
necessary  to  make  a  comparison  between  calculated  stresses  due  to  counterweight  influ- 
ences and  the  measured  stresses.  Such  a  comparison  involves  an  analysis  of  the  effects 
of  the  unbalanced  weight  in  or  upon  each  driving  wheel.  For  this  analysis  it  was 
necessary  to  consider  the  weight  of  the  main  rod,  side  rods,  eccentric  crank,  and  counter- 
weight and  also  the  distance  between  their  respective  planes  of  rotation.  For  this  par- 


Rail    Stresses    and    Depressions   With    Steam    Locomotive    233 


Weights  of  Rotating  and  Reciprocating  Parts  In  Pounds  —  Class 
Ul  LocomotiTe  of  Pennsylvaiiln  Railroad 

All  welgbts  given  for  the  rotating  parts  are  at  crank  pin  radius 
or  the  equivalent  weights  at  crank  pin  radius. 

Reciprocating  Parts 

Total  weight  of  reciprocating  parts  (one  side)    1807  lb. 
47jt  of  reciprocating  parts  850  lb. 

Rotating  Parts 

Driver  number  4     3  Ualn  1 

473t  of  reciprocating  parts  212i  212i  212i  212i 

Main  rod,  weight  on  crank  pin  606 

Side  rod,  weight  on  crank  pin  146  464  625  146 

Total  358i   676i  1443i  356^ 

Total  counterbalance  weight  (weighed  or 

checked  with  crank  pins,  collars  and 

eccentric  In  place)  358i  676*  1443i  3584 

ticular  comparison,  it  was  thought  desirable  to  make  certain  refinements  in  the  deter- 
mination of  the  effective  revolving  weight  of  the  main  rod  and  the  eccentric  crank, 
and  also  to  include  the  vertical  component  of  the  force  exerted  by  the  main  rod  on  the 
crank  pin   in  accelerating  and   decelerating  the  reciprocating  weights. 

The  motion  of  the  main  rod,  relative  to  the  locomotive,  is  of  course  rotational  at 
one  end  and  reciprocating  at  the  other.  The  equivalent  revolving  weight  of  the  crank 
pin  end  may  be  determined  by  the  equations  for  plane  motion  of  a  rigid  body.  In- 
vestigations of  a  number  of  main  rods  by  locomotive  builders  and  by  mechanical 
engineers  has  shown  that  the  equivalent  revolving  weight  may  be  closely  approximated 
as  seven-eighths  of  the  scale  weight  of  the  crank  pin  end,  and  this  value  was 
accordingly  used  in  this  analysis. 

The  weight  of  the  eccentric  crank  was  computed  to  be  130  lb.  and  to  have  its 
center  of  gravity  10.5  in.  from  the  center  of  rotation  of  the  main  driver.  Converted  to 
crank  pin  radius  the  weight  of  the  eccentric  crank  becomes  91  lb.  A  radial  line  through 
the  center  of  gravity  of  the  eccentric  crank  makes  an  angle  of  approximately  10  deg. 
with  a  radial  line  through  the  crank  pin  and  lags  the  pin  in  position  in  both  main 
drivers  when  the  motion  of  the  locomotive  is  forward.  For  purposes  of  analysis  it  was 
convenient  to  divide  the  eccentric  crank  weight  into  two  components,  one  component 
being  parallel  to  a  radial  line  through  the  crank  pin  and  the  other  at  an  angle  of 
90  deg.  thereto.  For  this  locomotive  these  two  components  are  88  lb.  and  24  lb. 
respectively.  The  equivalent  revolving  weight  of  the  back  end  of  the  eccentric  rod, 
assumed  to  be  12.S  lb.  at  crank  pin  radius,  was  added  to  this  latter  component  giving 
a  total  weight  of  36. S  lb.  for  the  90-deg.  component.  To  the  component  parallel  to  a 
radial  line  through  the  crank  pin  was  added  the  weight  of  the  included  part  of  the 
main  pin   (25  lb.)  giving  a  total  component  of  113  lb. 

In  Table  12  arc  given  the  horizontal  center-to-center  distances  between  side  rods, 
main  rods,  eccentric  cranks  and  counterweights.  Also  given  are  the  values  of  the  total 
weight  of  the  rotating  parts.  These  values  of  total  weights  include  the  weights  given  in 
Table  11  to  which  have  been  added  the  calculated  weights  of  included  parts  of  crank 
pins.  The  weight  of  the  included  part  of  the  crank  pin  added  to  a  side  rod  or  main 
rod  has  also  been  added  to  the  corresponding  counterweight  values  given  in  Table  11 
to  give  the  total  value  of  counterbalance  weight  acting  at  crank  pin  radius.  For  con- 
venience  in   rotational  calculations,  all  these  weights  have  been  given  as  at   ciank  pin 


234  Stresses    in    Railroad    Track 


Total  Weights  of  Rotating  Parts  and  Center  to  Center  Distances  — 
Class  Ml  Locomotive  of  Pennsylvania  Railroad 

..eights  are  In  pounds  and  distances  In  Inches.  All  weights  given  are 
at  crank  pin  radius  or  the  equivalent  weights  at  crank  pin  radius. 


Center  to  Center  Distances 

Side  rod,  main  pin  '^  3/8 

Main  rod,   main  pin  91  1/2 

Eccentric  crank,  main  pin  103 

Countervi'eight,  main  driver  '                                      63  1/4 

Counterweight,   drivers  1  and  4  60  7/8 

Counterweight,    Intermediate  driver  61 


V/elghts  of  Rotating  Parts 

Side  rod  and  included  pin,   drivers  1  and  4   (146  +  36)  182 

Side  rod  and  included  pin.    Intermediate  driver  (464  +  36)  500 

Main  rod  and  included  pin,  main  driver  (7/8  x  606  +  109)  639 

Side  rod  and  included  pin,  main  driver  (625  +  108)  733 

Eccentric  crank  and  included  pin   (88  +  25)  113 

Counterweight,    drivers  1   and   4   (356*  +  36)  394* 

Counterweight,    intermediate  driver   (676|  +  36)  712* 

Counterveight,   main   driver   (1443 J  +  242+  88)  1773t 

*  Component  of  eccentric  crank  weight  acting  in  direction  opposite 
counterweight  plus  included  part  of  eccentric  crank  pin.     Compon- 
ent at  90  degrees  is  36.5  lb.  which  leads  counterweight  position 
in  both  right  and  left  main  drivers. 

radius.  No  consideration  was  given  to  the  weight  of  the  hub  of  the  main  pin  as  it  is 
practically  in  the  same  plane  as  the  counterweight  and  would  have  neghgible 
out-of-plane  effect. 

The  weights  referred  to  above  may  be  considered  to  be  proportional  to  the 
rotational  or  centrifugal  forces  which  act  radially,  for  any  given  speed  of  the  locomo- 
tive, and  for  convenience  they  may  be  used  as  forces  with  horizontal  and  vertical 
components.  Using  the  values  of  these  forces  given  in  Table  12,  with  the  counter- 
weight on  the  right  side  in  a  down  position,  moments  of  first  the  vertical  forces  and 
second  the  horizontal  forces  acting  on  a  pair  of  driving  wheels  are  taken  about  a 
vertical  plane  through  the  center  of  the  counterweight  of  the  left  wheel  of  the  pair. 
Corresponding  moments  are  then  taken  about  the  vertical  plane  through  the  center  of 
the  counterweight  of  the  right  driver.  From  these  moments  the  resultant  unbalance 
(horizontal  and  vertical  components  and  their  resultant)  in  the  plane  of  the  counter- 
weight is  determined.  The  resultant  unbalance  in  each  driver  with  its  components,  as 
calculated  in  this  manner,  is  shown  in  Fig.  49  together  with  positions  with  respect  to 
the  counterweight. 

It  will  be  observed  in  Fig.  49  that  the  calculated  resultant  unbalance  in  the  right 
main  driver  is  305  lb.  and  that  it  leads  the  counterweight  position  by  approximately 
82  deg.  whereas  the  resultant  unbalance  in  the  left  main  driver  is  only  207  lb.  and  lags 
the  counterweight  position  by  approximately  84  deg.  The  resultant  unbalance  in  both 
the  first  and  fourth  drivers  is  191  lb.  It  leads  the  counterweight  position  by  7  deg. 
in  the  right  drivers  and  lags  by  7  deg.  in  the  left  drivers.  For  the  third  drivers  the 
resultant  unbalance  is  found  to  be  161  lb.  per  driver  and  it  leads  the  counterweight 
position  by  approximately  22  deg.  in  the  right  driver  and  lags  by  the  same  amount  in 
the  left  driver. 

It  should  be  understood  that  these  calculated  values  of  resultant  unbalance  do  not 
in  any  way  show  lack  of  proper  attention  to  the  counterbalancing  of  the  locomotive. 
It  is  common  practice  to  place  more  counterweight  in  the  driving  wheel  of  a  locomo- 
tive than  is  required  to  balance  the  rotating  parts  in  order  that  the  inertia  effects  of 


Rail   Stresses   and    Depressions   With    Steam    Locomotive    235 


Fig.  49. — Calculated  Components  and  Resultant  Unbalance  in  Pounds  at  Crank 

Pin  Radius  in  Locomotive  Driving  Wheels — Class  Ml  Locomotive 

of  the  Pennsylvania  Railroad. 


the  reciprocating  parts  may  be  reduced  with  resulting  reduction  in  the  shaking  forces 
on  the  locomotive  frame  and  in  the  reduction  of  the  nosing  tendency  of  the  locomotive. 
It  is  necessary,  however,  to  know  the  amount  and  position  of  the  resultant  unbalance 
in  each  driving  wheel  brought  about  by  this  practice  in  order  that  proper  interpretation 
may  be  placed  on  the  measured  values  of  stress  and  bending  moment  developed  in  the 
rail  by  the  locomotive. 

The    general    formula    for    calculating    the    dynamic    augment    produced    by    the 
unbalanced  rotating  parts  is  the  formula  for  centrifugal  force, 

^=-rr- (^2)" 

in  which 

W  =  the  weight  of  the  rotating  part  for  which  the  dynamic  augment  is  desired,  or 
the  unbalanced  part  of  the  rotating  parts  in  case  the  rotational  effect  is  wanted, 
g  =z  the  acceleration  of  gravity. 
V  =  the  rotational  velocity  or  speed  of  the  part, 
r  =  the  radius  of  the  circle  described  by  the  center  of  gravity  of  the  rotating  part. 

The  equation   implies  consistent  units,  and   the  values  may   be   taken   in   pounds, 
feet,  and  seconds,  with  g  as  32.2  ft.  per  sec.  per  sec. 

The  above  formula  is  converted  to  the  following  form  for  convenience  in  use: 


3.21WS'R 
Dynamic  Augment  C  := -^ 


(75) 


in  which 

W  =  the  weight  of  the  unbalance  at  crank  pin  radius  in  pounds. 
5  =  locomotive  speed  in  miles  per  hour. 
R  =z  crank  pin  radius  in  inches. 
D  ^  diameter  of  drivers  in  inches. 

For  the  speed  of  the  tests  (75  miles  per  hour)  the  calculated  dynamic  augment  for 
each  individual  driver  resulting  from  substituting  in  the  above  equation  the  values  of 
resultant  unbalance  given  in  Fig.  49  becomes  for  the  right  side,  from  front  to  rear, 
10,000,  15,900,  8,400,  and  10,000  lb.,  respectively,  and  for  the  left  side  10,000, 
10,800,  8,400,  and  10,000  lb.,  respectively.  The  vertical  component  of  the  dynamic  aug- 
ment for  any  position  of  a  wheel  then  is  a  force  applied  to  the  rail  in  addition  to  the 


'«AREA  Proceedings,  Vol.  21,   1920,  page  653. 


236  Stressesin    Railroad    Track 

static  wheel  load.  Calculations  for  bending  stress  in  rail  may  then  be  made  for  such 
loads  by  the  methods  used  for  calculating  stresses  in  rail  developed  by  a  combination 
of  static  wheel  loads."  The  stresses  thus  determined  may  be  added  algebraically  to  the 
stresses  developed  under  the  combination  of  static  wheel  loads. 

For  a  modulus  u  of  2,500  lb.  per  in.  per  in.,  the  measured  modulus  for  this  track, 
the  stresses  in  the  base  of  the  rail  produced  by  the  combined  effect  of  the  individual 
dynamic  augments  were  calculated  to  be  +  3,700,  +  6,000,  +  1,900,  +  3,400  lb.  per 
sq.  in.  under  the  first,  second,  third  and  fourth  drivers  on  the  right  side,  respectively, 
and  on  the  left  side  +  3,900,  +  3,900,  +  2,100  and  +  3,500  lb.  per  sq.  in.  respectively. 
It  should  be  noted  that  these  values  of  stress  in  base  of  rail,  under  the  individual 
drivers,  are  calculated  for  the  instant  that  the  resultant  unbalance  for  the  driver  under 
consideration  is  in  a  down  position  (see  Fig.  49)  and  do  not  in  all  cases  represent  the 
maximum  stress  developed  under  that  driver  due  to  the  simultaneous  combined  effects 
of  the  dynamic  augments  of  the  other  drivers  on  the  same  rail.  The  maximum  effect 
of  the  different  drivers  on  the  rail  do  not  occur  simultaneously  with  each  other. 
Nevertheless,  the  values  of  stress  given  are  usually  fairly  close  to  the  maximum 
calculated  values. 

Other  variable  vertical  forces  applied  to  the  track  include  the  vertical  component 
of  the  force  transmitted  to  the  main  driver  crank  pin  by  the  main  rod.  As  the  locomo- 
tive was  allowed  to  drift  over  the  gage  locations  and  as  information  is  not  available 
on  the  pressures  applied  to  the  piston  when  steam  is  shut  off  no  attempt  will  be  made 
to  take  into  account  forces  of  this  kind.  The  inertia  effects  of  the  reciprocating  parts, 
however,  have  a  magnitude  that  requires  consideration. 

It  is  not  known  whether  the  vertical  component  of  these  inertia  forces  of  the 
reciprocating  parts  applied  to  the  main  pin  by  the  main  rod  may  in  any  part  be  trans- 
mitted to  wheels  other  than  the  main  driver.  In  the  calculations  this  vertical  force  has 
been  considered  to  be  applied  wholly  to  the  main  driver. 

The  vertical  variable  force  on  the,  main  pin  produced  by  the  inertia  effects  of  the 
reciprocating  parts  and  transmitted  to  the  main  pin  through  the  main  rod  may  be  closely 
calculated  by  the  formula, 

W         r  r  r  sin  0 1 

^=T'"^1T('='^®+T^«^2e)-^^J (76)- 

in  which 

F  =  the  vertical  component  of  the  force  on  the  main  pin  transmitted  to  the  pin 
through  the  main  rod  and  produced  by  the  inertia  effects  of  the  reciprocating 
parts. 
W^  total  weight  of  reciprocating  parts  on  one  side  of  the  locomotive. 

g  z=z  acceleration  of  gravity. 

^  =  angular  velocity  of  main  driver. 

r  =  crank  arm  radius. 
^=r  length  of  connecting  rod  (115  in.). 

6  =  angle  which  the  crank  arm  makes  with  the  horizontal. 

0cr:  angle  which  the  connecting  rod  makes  with  the  horizontal. 


'^  Reference  to  the  principles  given  in  the  analysis  of  track  action  in  the  Sixth  Progress  Report 
(pages  278-291)  will  show  that  the  moment  and,  therefore,  the  stress  produced  by  a  combination  of 
wheel  loads  may  be  found  by  calculating  the  load  for  a  single  wheel  which  is  equivalent  to  the  com- 
bined effect  of  the  several  wheels  in  moment  producing  effect,  and  using  the  resulting  load  (wh'ch  is 
termed  the  equivalent  single  wheel  load)  in  the  formula  for  bending  moment  in  rail.  The  formula  for 
bending  moment  in  rail  is  M„  =  0.318  P*,  (Equation  (8)  page  279  of  the  Sixth  Progress  Report)  where 
P  is  the  equivalent  single  wheel  load  and  «j  is  the  distance  from  the  wheel  load  to  a  point  of  zero 
bending  moment  in  the  rail  for  a  single  wheel  load  on  the  track  in  question. 

'•  This  equation  was  derived  by  using  the  equation  for  acceleration  of  the  crosshead  of  a  steam 
engine  as  given  in  Seely  and  Ensign's  "Analytical  Mechanics  for  Engineers"   (second  edition)   p.    164. 


Rail    Stresses    and    Depressions    With    Steam    Locomotive    237 


0.6        0.7       0.8        0.9        1.0         0.1        0.2       0.3 
Position    of   Counterweight    in   Ports    of   o   Revolution 

Fig.  SO. — Calculated  Stresses  in  Base  of  Rail  under  Main  Driver  Due  to  Dy- 
namic Augment  and  Inertia  Effects  of  Reciprocating  Parts  for  Speed  of 
75   Miles  per  Hour — Class  Ml   Locomotive— 131-lb.   RE   Rail. 


It  should  be  noted  that  O  should  be  taken  as  zero  degrees  for  the  position  of  the 
stroke  in  which  the  piston  is  farthest  from  the  driver.  The  equation  implies  consistent 
units,  and  the  values  may  be  taken  in  pounds,  feet  and  seconds. 

This  resulting  vertical  variable  force  on  the  main  pin  at  any  point  in  the  revolution 
may  be  treated  as  an  additional  vertical  force  applied  to  the  rail  by  the  main  driver. 
The  additional  stress  produced  by  this  force  may  be  added  algebraically  to  the  stress 
due  to  static  load  and  dynamic  augment. 


238 


Stresses   in    Railroad   Track 


In  Fig.  50  are  given,  through  a  complete  revolution  of  the  main  driver,  curves 
for  the  stresses  in  the  base  of  the  rail  calculated  by  the  methods  described  above  and 
produced  by  the  unbalanced  rotating  parts  and  the  inertia  effects  of  the  reciprocating 
parts.  The  ordinates  of  the  diagram  represent  stresses  in  the  base  of  the  rail  in  pounds 
per  square  inch,  calculated  for  a  speed  of  75  mUes  per  hour  and  a  modulus  u  of 
2,500  lb.  per  in.  per  in.  The  abscissas  represent  the  position  of  the  counterweight  with 
respect  to  its  down  position,  the  scale  being  in  fractions  of  a  complete  revolution  of 
the  driver.  The  curve  shown  as  a  dot-dash  line  and  varying  nearly  as  a  sine  wave,  with 
the  same  frequency  as  the  rotational  frequency  of  the  driver,  represents  the  stress 
produced  by  the  combined  effects  upon  the  rail  of  the  dynamic  augments  for  the  several 
drivers.  The  curve  shown  as  a  dashed  line  and  varying  nearly  as  a  sine  wave   but 

Table  13 

Ueaaured  Stresses  and  Calculated  Stresses  In  Base  of  Rail  — 
Ula  Locomotive  6718  of  the  Pennsylvania  Railroad  at 
Elkton,  Ua.ryland 

Stresses  are  given  in  tbousanas  of  pounds  per  square  inch. 
Ueasured  values  are  for  5  miles  per  hour. 


Loca-Trail- 

Driver  Number 

Truck 
Wheel 

tlon   er 

4 

3 

Ualn 

1 

2 

I 

Left  Rail 


Measured  stress  -  Average  of    4 
3  runs  at  5  m.p.h.  5 

6 
Av. 

Calculated  from  scale  weights 

Calculated  from  nominal  weights 


13.4 
11.9 
12.3 
12.5 

9.7 
11.6 
10.1 
10.5 

7.3 

lo.p 

7.1 
8.1 

9.8 

8.8 

il.4 

10.0 

11.2 
7.9 

10.1 
9.7 

3.5 
0.9 
3.8 
2.7 

13.4 

11.0 

6.8 

8.2 

9.1 

1.4 

11.6 

9.6 

V.7 

8.£ 

9.3 

1.7 

4.9 
4.6 
4.9 
4.8 


4.4 

4.8 


Right  Rail 


Ueasured  stress  -  Average  of    4 
3  runs  at  5  n.p.h.             5 

6 
Av. 

8.3 
7.7 
7.9 
8.0 

9.8 
12.1 

8.9 
10.3 

7.9 

12.8 

7.5 

9.4 

9.8 
12.7 
12.7 
11.7 

10.4 

12.6 

9.9 

11.0 

3.8 
1.0 
2.6 
2.5 

5.6 
4.9 
4.4 
5.0 

Calculated  from  scale  weights 

9.9 

10.4 

8.2 

7.8 

8.3 

1.9 

4.9 

Calculated  from  nominal  weights 

11.6 

9.8 

7.7 

8.2 

9.3 

1.7 

4.8 

having  a  frequency  twice  that  of  the  rotational  frequency  of  the  driver  represents  the 
stress  produced  by  the  vertical  component  of  the  force  on  the  main  pin  due  to  the 
inertia  effects  of  the  reciprocating  parts,  no  account  having  been  taken  of  the  out-of- 
plane  effect  of  the  force.  These  two  curves  have  been  added  algebraically  to  give  the 
resultant  varying  stress  in  the  base  of  the  rail  due  to  dynamic  augment  and  inertia 
effects  of  reciprocating  parts.  The  resultant  stress  is  shown  by  the  heavy  full  line.  In 
calculating  the  vertical  component  of  the  force  on  the  main  pin  produced  by  the 
inertia  effects  of  the  reciprocating  parts,  the  total  weight  of  the  reciprocating  parts  on 
one  side  (1,807  lb.)  was  used. 

In  Table  13  are  given  the  measured  stresses  in  the  base  of  each  rail  at  each  gage 
location  for  each  wheel  of  the  locomotive  at  a  speed  of  five  miles  per  hour.  The  given 
values  are  the  average  of  three  runs.  The  average  of  the  values  at  the  three  gage  loca- 
tions for  each  rail  and  individual  wheel  are  also  given.  Computed  stresses  in  the  base 
of  rail  based  on  the  reported  scale  weights  and  on  the  nominal  wheel  loads  are  included 


Rail    Stressc  s    and    Depressions    With    Steam    Locomotive    23Q 

in  Table  13  to  afford  a  comparison  between  the  measured  and  calculated  stresses  under 
static  loading  conditions. 

It  will  be  observed  that  the  measured  values  of  stress  in  the  left  rail  for  a  given 
wheel  differ  at  the  three  gage  locations  and  that  no  one  of  the  three  locations  gives 
values  consistently  high  or  low  for  all  wheels  of  the  locomotive.  The  stresses  under  the 
first  and  the  main  driver  at  Location  S  are  1,000  to  3,000  lb.  per  sq.  in.  lower  than 
those  at  locations  4  and  6,  but  under  the  third  and  fourth  drivers  the  stresses  are 
1,500  to  3,000  lb.  per  sq.  in.  higher  than  at  locations  4  and  6.  The  stresses  under  the 
first  truck  wheel  and  the  trailer  are  substantially  the  same  for  all  three  locations.  The 
differences  noted  are  not  great  and  may  be  due  in  part  to  irregularities  in  track  support 
and  transfer  of  load  between  adjacent  wheels  through  equalizer  action.  However,  the 
variations  in  stress  at  the  three  locations  for  a  given  wheel  may  in  general  be  considered 
not  unexpectedly  great  and  the  average  of  the  values  given  at  the  three  locations  for 
each   wheel  may   be  considered  representative   of   the   track  and   locomotive   conditions. 

The  measured  values  of  stress  given  for  the  right  rail  show  about  the  same  range 
of  differences  in  values  at  the  three  locations  for  each  wheel  as  was  found  for  the  left 
rail.  It  will  be  observed,  however,  that  for  all  four  drivers  the  stresses  at  Location  5 
are  from  2,000  to  5,000  lb.  per  sq.  in.  higher  than  at  locations  4  and  6.  The  measured 
play  between  rail  and  tie  and  tie  support  at  Location  5  was  somewhat  less  than  at 
locations  4  and  6,  which  would  normally  result  in  lower  stresses  at  Location  5.  The 
fact  that  the  measured  stresses  at  Location  5  were  higher  than  at  the  other  two  loca- 
tions would  further  seem  to  indicate  transfer  of  load  from  the  adjacent  drivers  to  the 
driver  passing  location  5. 

In  Figs.  51  and  52  are  plotted  for  all  eight  driving  wheels  of  the  locomotive,  through 
a  complete  revolution  of  the  drivers,  the  measured  stresses  in  the  base  of  the  rail  at  the 
three  gage  locations  on  each  rail,  for  all  runs  at  75  miles  per  hour.  The  curves  given 
for  the  individual  driving  wheels  are  analytical  curves.  They  represent  the  stresses  in 
the  base  of  the  rail  computed,  as  outlined  previously,  on  the  basis  of  a  modulus  u  of 
2,500  lb.  per  in.  per  in.  and  a  speed  of  75  miles  per  hour.  The  curve  for  each  driving 
wheel  other  than  the  main  driver  is  the  algebraic  sum  of  the  calculated  stress  in  the 
base  of  the  rail  produced  by  the  nominal  static  wheel  loads  (values  given  in  Table  13 
and  represented  in  the  figures  by  the  horizontal  dashed  lines)  and  the  calculated  stress 
produced  by  the  combined  effects  of  the  dynamic  augments  of  the  drivers.  For  the 
main  drivers  the  analytical  curve  includes  also  the  stress  produced  by  the  vertical 
component  of  the  force  on  the  main  pin  due  to  the  inertia  effects  of  reciprocating 
parts.  The  heavy  horizontal  lines  represent  the  average  of  the  measured  stresses  for  a 
given  wheel  at  five  miles  per  hour. 

The  number  of  observed  points  for  each  driver  is  not  sufficient  to  establish 
definitely  a  curve  for  probable  average  stress  throughout  a  revolution  of  the  driver, 
though  in  general  the  points  are  fairly  uniform  in  their  distribution  horizontally.  In 
particular,  for  the  first  and  fourth  drivers  and  the  left  main  driver  the  agreement  between 
the  trend  of  an  averaging  curve  and  the  analytical  curve  is  quite  good.  The  results  for 
the  right  main  driver  are  obviously  discordant.  They  do  not  follow  the  pattern  of 
the  calculated  curve  nor  is  the  maximum  measured  stress  for  the  right  driver  in  exce=s 
of  that  for  the  left,  as  would  be  expected  from  the  values  of  calculated  resultant  un- 
balance in  these  two  drivers.  No  definite  effect  of  unbalance  in  this  driver  is  shown 
in  the  plotted  points  throughout  a  revolution.  The  range  of  stress  each  side  of  the 
average  measured  stress  is  not  large.  It  would  be  interesting  to  know  what  principal 
contributing  sources  influence  this  departure  from  a  definite  counterbalance  trend. 


240 


Stresses    in    Railroad    Track 


0.5      0.6      0.7       0.8       0.9        1.0       0.1        0.2       0.3       0.4      0£ 
Position   of  Counterweight  in   Parts  of  a  Revolution 

Fig.  51. — Observed  Stresses  in  Rail  with  Mia  Locomotive  6718  of  the 
Pennsylvania  Railroad  at  75  Miles  oer  Hour — 131-lb.  RE  Rail. 


Rail    Stresses    and    Dcpr  essions    With    Steam    Locomotive    241 


0.5      0.6       0.7       0.8       0.9        1.0       0.1        0.2       0.3       0.4       0.5 
Position    of    Counterweight   in    Fbrts    of   a    Revolution 

Fig.  52. — Observed  Stresses  in  Rail  with  Mia  Locomotive  6718  of  the 
Pennsylvania  Railroad  at  75  Miles  per  Hour — 131-lb.  RE  Rail. 


242 


Stresses    in    Railroad   Track 


It  will  be  noted  that  for  several  of  the  drivers  the  agreement  between  the  trend 
of  the  observed  points  and  the  vertical  position  of  the  analytical  curve  would  be 
improved  by  moving  the  analytical  curve  upward  by  the  amount  of  the  difference 
between  the  average  measured  stress  at  five  miles  per  hour  and  the  calculated  static 
stress  based  on  the  nominal  wheel  weights.  For  instance,  for  the  right  first  driver  the 
average  measured  stress  in  the  base  of  the  rail  is  about  1,700  lb.  per  sq.  in.  greater  than 
the  calculated  static  stress.  Moving  the  analytical  curve  for  this  driver  vertically 
upward  by  this  difference  would  result  in  better  agreement  between  the  resulting  curve 
and  the  average  of  the  measured  values. 

It  should  be  understood  that  the  analytical  curves  given  for  the  individual  drivers 
do  not  take  into  consideration  possible  effects  of  the  forces  due  to  locomotive  oscilla- 
tion, vibration,  etc.,  and  do  not  take  into  account  additional  forces  that  may  be  pro- 


Table  14 

Measured  and  Calculated  Depressions  of  Rail  —  Class  Mia  Loco- 
motive 6718  of  Pennsylvania  Railroad  at  Elkton,  Maryland 

Depressions  are  given  In  inches.  Measured  values  are  for  5 
miles  per  hour. 


Loca-Trall- 
tion  I  e 


Driver  Number 


Truck 
Wheel 


Measured  gross  depression  -     4 
Average  of  3  runs  at  5  m.p.h.   5 

6 

Av. 

Calculated  from  scale  weights 
Calculated  from  nominal  weights 


lett  Bail 


.206 
.147 
.243 
.199 

.209 
.164 
.259 
.211 

.215 
.168 
.265 
.216 

.218 

.158 
.278 
.218 

.206 
.138 
.257 
.200 

.143 
.088 
.194 
.142 

.144 

.168 

.187 

.196 

.180 

.097 

.124 

.159 

.192 

.199 

.181 

.102 

.107 
.067 
.145 
.106 

.059 


Measured  gross  depression  -  4 

Average  of  3  rans  at  5  m.p.h.       5 

6 
Av. 

Calculated  from  sosde  weights 

Calculated  from  nominal  weights 


.162 
.135 
.187 
.161 

.210 
.196 
.234 
.213 

.218 
.208 
.243 
.223 

.826 
.212 
.258 
.232 

.200 
.185 
.226 
.204 

.142 
.104 
.154 
.153 

.107 

.165 

.198 

.192 

.169 

.098 

.124 

.159 

.192 

.199 

.181 

.102 

.102 
.083 
.112 
.099 

.066 

.065 


duced  by  the  variations  in  the  track  support,  the  changing  distribution  of  the  individual 
driver  and  wheel  loads,  the  inertia  effect  of  unsprung  weight,  and  the  effect  of  speed. 
Any  one  or  a  combination  of  these  factors  may  influence  the  measured  stresses  in  the 
base  of  the  rail  to  a  considerable  degree. 

A  fact  of  significance  to  be  observed  from  these  measured  stress  values  is  the 
comparatively  low  maximum  stresses  recorded  in  the  base  of  the  131-lb.  rail  at  75  miles 
per  hour.  The  highest  individual  stress  value  was  about  20,000  lb.  per  sq.  in.  correspond- 
ing to  a  bending  moment  in  the  rail  of  548,000  in.-lb.  It  is  apparent  that  the  counter- 
balancing conditions  of  the  locomotive  do  not  give  unduly  high  stresses  in  the  rail  for 
this  speed  of  operation. 

As  the  plotted  positions  of  counterweight  are  distributed  fairly  evenly  throughout 
the  revolution  of  the  driver,  the  average  of  the  plotted  points  will  not  differ  far  from 
the  average  stress  throughout  a  revolution.  The  difference  between   this  average  stress 


Rail    Stresses    and    Depressions    With    Steam    Locomotive    243 


20 


15 


10 


0 
20 


15 


1.0 


Second  (Mam)  Driver 
Left  Rail 


0 


1 

Second  (Mam)  Driver 

Right   Rail 

/ 

X      5^           ^ 

// 

( 

XXXx 
•  Xx'^ 
XX 

k  ^ 

o            / 

o      /   H 

K 

xy 

Z^° 

/ 

/ 

/ 

0  Gage    Location    4 

/ 

X  Gage    Location   5 

+  Gage    Location  6 

1 

o.oe 


C/2 


0.28 


0.32 


0.16  0.20  0.24 

Gross    Depression   in    Incties 

Fig.  53.— Observed  Stresses  in  Rail  and  Observed  Rail  Depressions 

for  Main  Drivers  for  Steam  Locomotive  6718  at  75 

Miles  per  Hour. 

and  the  average  of  the  measured  stresses  at  five  miles  per  hour  may  be  thought  of  as 
representing  the  effect  of  speed  independent  of  counterbalance  and  inertia  effects.  On 
this  basis  the  effect  of  speed  at  each  driver  of  this  locomotive  was  slight,  very  much 
less  than  found  in  a  variety  of  steam  locomotives  tested  in  earlier  years. 

At  the  six  locations  where  magnetic  strain  gages  measured  rail  stresses,  solenoid 
depre.sion  gages  were  mounted  to  indicate  the  depression  of  the  rail  with  reference 
to  a  support  fixed  in  the  roadbed.  In  Table  14  are  given  the  measured  gross  depressions 
at  each  test  location  for  each  wheel  of  the  locomotive.  The  values  given  are  the  average 
of  three  runs  at  5  miles  per  hour.  The  averages  for  the  three  locations  on  each  rail 
are  also  given.  Depressions  of  the  rail  calculated  on  the  basis  of  the  reported  scale 
weights  of  the  wheels  of  the  locomotive  and  on  the  basis  of  the  nominal  wheel  loads 
are  also  given  in  Table  14.  In  comparing  the  values  of  measured  depression  with  the 
values  of  calculated  depression  it  should  be  remembered  that  the  measured  values  are 
gross  values  which  include  the  play  between  rail  and  tie  and  tie  support. 


244 


Stresses    in    Railroad   Track 


20 


15 


10 


Fourth 
Right 

Driver 
Rait 

X 

/ 

X 

/ 

/ 
/    / 

X 

-x"A 

X 

X/XX                yd 

^+ 

/ 

j^      0 

J  H7                  H 

/     +4 

h 

/ 

^  ^ 

0 

0.08 


0.12 


0.16  0.20 

Cross     Depression 


0.24 
I  riches 


0.28 


0.32 


Fig.  54. — Observed  Stresses  in  Rail  and  Observed  Rail  Depressions 

for  Fourth  Drivers  for  Steam  Locomotive  6718  at 

75  Miles  per  Hour. 


In  Figs.  53  and  54  the  measured  stresses  in  the  base  of  the  rail  at  the  three  gage 
locations  for  the  main  and  the  fourth  drivers  have  been  plotted  against  the  correspond- 
ing measured  gross  depressions  of  the  rail  for  all  runs  at  75  miles  per  hour.  It  will  be 
seen  that  the  trend  of  the  plotted  points  for  each  location  is  well  represented  by  a 
straight  line.  Plots  similar  to  those  shown  in  Fig.  53  were  made  for  each  of  the  drivers 
and  locations  and  in  all  cases  a  straight  line  of  the  proper  slope  expressed  the  relationship 
between  the  measured  values  of  stress  and  depression. 

In  Fig.  55  the  data  given  for  the  right  fourth  driver  in  Fig.  54  are  plotted  in  a 
different  manner  to  further  demonstrate  the  linear  relationship  between  measured 
values  of  stress  and  depression.  The  ordinates  on  the  left  of  the  figure  represent  the 
stress  in  the  base  of  the  rail  and  those  on  the  right  represent  the  gross  depression  of 
the  rail.  The  scales  of  the  stress  and  depression  values,  plotted  as  ordinates,  are  related 


Rail    Stresses   and    Depressions    With    Steam    Locomotive    24S 


0.26 


0.20 
/0.5  0.6    0.7    0.8    0.9     1.0    0.1     0.2    0.3    0.4  0.5 

Fbsition   of  Counterweight  in   Parts   of  a   Revolution 

Fig.  55.— Measured  Stress  in  Rail  and  Depression  of  Rail  under 

Right  Fourth  Driver  for  Speed  of  75  Miles  per  Hour— 

Class  Mia  Locomotive  6718— 131-lb.  RE  Rail. 


according  to  the  average  slope  (0.008  in.  depression  per  1,000  lb.  per  sq.  in.  stress) 
obtained  from  the  lines  given  in  Fig.  54.  The  plotted  points  in  the  figure  are  the 
averages  of  the  measured  values  of  stress  and  depression  taken  in  groups  for  each 
one-tenth  of  a  revolution  of  the  driver.  It  may  be  seen  from  Fig.  55  that  for  each 
gage  location  the  same  curve  would  represent  the  position  and  trend  of  cither  the 
average  values  of  stress  or  the  average  values  of  the  depression  equally  well.  The  same 
statement,  of  course,  would  be  true  for  the  curve  representing  the  position  and  trend  of 
the  average  of  the  values  of  all  three  locations. 

It  is  thought  not  necessary  to  give  diagrams  of  measured  rail  depressions  plotted 
with  respect  to  the  position  of  counterweight.  As  would  be  expected  from  the  con- 
cordance between  stresses  and  depressions  given  in  Figs.  53  and  54  and  55,  the  diagrams 
of  rail  depression  throughout  the  revolution  of  a  driver  correspond  closely  with  the 
diagrams  for  stresses.  In  general  the  trends  of  averages  of  points  followtd  the  form  of 
the  analytical  curves  in  a  way  similar  to  the  plotted  .stresses  and  corroborated  the  stress 
relations  in  a  surprisingly  close  manner.  The  one  exception  was  the  right  main  driver, 
where  the  distribution  of  points  gave  no  indication  of  counterbalance  effect.  Even  the 
extreme  points  of  the  measured  depressions  substantiated  the  corresponding  stress 
values.  In  fact,  as  a  whole,  the  depressions  and  stresses  were   mutually  confirmatorv. 


246  Stresses    in    Railroad   Track 


VI.  Other  Activities 

24.  Other  Activities. — Other  activities  of  the  staff  of  the  committee  during  the 
past  few  years  have  been  quite  varied  and  extensive.  The  progress  of  several  of  the 
analytical  and  experimental  investigations  has  been  reported  from  time  to  time  in 
the  annual  discussions  by  the  chairman  published  in  the  Proceedings  of  the  American 
Railway  Engineering  Association.  A  few  of  the  activities  of  the  staff  may  be  mentioned. 

The  observations  on  stretches  of  continuously  welded  rail  have  now  covered  a 
period  of  four  years  on  the  Delaware  &  Hudson  Railroad  and  three  years  on  the 
Bessemer  &  Lake  Erie  Railroad.  Observations  on  the  service  tests  of  various  types  of 
joint  bars,  made  in  cooperation  with  the  Committee  on  Rail,  have  now  extended  over 
a  period  of  three  years.  These  observational  tests  of  rail  joints  have  been  continued  on 
12  half-mile  stretches  of  track  on  the  Pennsylvania  Railroad  and  9  one-mile  stretches 
on  the  Atchison,  Topeka  &  Santa  Fe  Railway. 

Tests  with  the  rail  joint  rolling  load  machine  have  continued  over  a  period  of  V/z 
years.  These  laboratory  tests  of  long-time  repetitive  loading  of  rail  joints  have  been 
made  to  study  some  of  the  many  problems  of  rail  joints.  They  include  forms  of  joint 
bars,  manner  of  failure,  wear  of  bar  and  fishing  surface,  and  sources  of  failure.  The  life 
of  joint  bars  under  repetitive  loading  given  by  very  heavy  wheel  loads  and  moderately 
heavy  wheel  loads  and  lighter  loads  and  the  possible  relations  between  cycles  of  loading 
and  the  fatigue  strength  of  joint  bars  of  different  form  and  different  material  have 
been  taken  up.  The  effect  of  abnormal  stresses  and  bearing  pressures  between  bar  and 
rail  and  magnitude  of  bolt  tension  have  been  considered. 

In  the  summer  of  1939  the  committee  again  cooperated  with  the  Pennsylvania 
Railroad  in  making  field  tests  at  Dover,  Del.  The  purpose  of  these  tests  was  to  obtain 
quantitative  information  on  the  action  of  types  of  locomotives  with  the  driving  wheels 
slipping  and  spinning  and  also  to  learn  the  action  of  the  locomotive  and  track  when  a 
mechanical  oscillator  is  attached  to  a  main  driving  wheel.  The  results  of  these  tests 
will  be  reported  at  some  later  time. 

The  staff  has  continued  the  study  of  electrical  strain  measuring  and  recording  instru- 
ments and  when  funds  were  available  purchases  have  been  made  of  items  that  seemed 
most  immediately  useful  and  most  adaptable  to  probable  future  needs.  A  considerable 
amount  of  development  work  has  been  done  in  connection  with  the  use  of  the  resistance 
strip  gage.  Experimental  units  constructed  showed  considerable  promise  for  improving 
the  usefulness  and  reliability  of  the  strip  gage  and  giving  advantages  in  calibration, 
frequency  response,  and  elimination  of  certain  troubles  experienced  previously.  As  a 
result  of  the  satisfactory  operation  of  the  experimental  models,  six  complete  units 
have  been  built  and  used  in  recent  tests  on  the  Denver  &  Rio  Grand  Western  Railroad 
at  Green  River,  Utah.  These  tests  were  somewhat  of  an  exploratory  nature  to  deter- 
mine if  possible  by  means  of  measurements  of  vertical  web  stresses  in  the  rail,  developed 
under  the  passage  of  locomotive  and  cars,  the  possible  cause  of  longitudinal  web  cracks 
in  the  112-lb.  rail  that  has  been  in  service  only  a  comparatively  short  time.  It  is 
believed  that  the  new  equipment  represents  an  important  advance  in  stress  measuring 
apparatus  for  track  and  equipment,  both  in  simplicity  and  in  applicability  in 
making  tests. 

Many  problems  of  importance  bearing  on  the  behavior  of  railroad  track  under 
moving  loads  of  locomotives  and  cars  still  call  for  information  and  explanation.  The 
committee  is  considering  plans  for  further  work. 

The  Special  Committee  on  Stresses  in  Railroad  Track 

A.  N.  Talbot,  Chairman. 


MEMOIRS 


MEMOIR 
(j^corge  ^tokcjf  Jfanning 

Died  January  2,  1941 

George  Stokes  Fanning  was  born  in  Detroit,  Mich.,  on  April  25,  1885,  the  son  of 
Charles  A.  and  Carrie  (Stokes)  Fanning.  He  attended  the  University  of  Michigan  at  Ann 
Arbor  and  was  graduated  with  the  degree  of  B.S.  in  C.E.  in  1906.  He  married  Nola  M. 
Bell  of  Saegertown,  Pa.,  on  June  18,  1914.  They  had  one  daughter,  Janet  A.,  who,  with 
Mrs.  Fanning,  survives  him. 


George  Stokes  Fanning 

Mr.  Fanning  entered  raihoad  service  in  1906  as  a  rodman  for  the  Michigan  Central 
Railroad.  From  1907  to  1910  he  was  instrumentman  and  assistant  engineer  of  the  Detroit 
River  Tunnel  Company.  From  1910  to  1913  he  was  resident  engineer  on  the  Algoma 
Central  &  Hudson  Bay  Railway.  In  1913  Mr.  Fanning  entered  the  employ  of  the  Erie 
Railroad  and  served  in  1913-14  as  resident  engineer;  1914-16  as  estimating  engineer; 
1916-18  as  chief  draftsman;  1918-20  as  assistant  to  chief  engineer;  1920-25  as  office 
engineer;  1925-27  as  principal  assistant  engineer;  1927-29  as  assistant  chief  engineer; 
and  from  1929  until  his  death  as  chief  engineer.  His  office  as  chief  engineer  of  the  Erie 
was  at  Cleveland,  Ohio. 


248 


Memoirs  249 

He  became  a  member  of  the  American  Railwaj'  Engineering  Association  in  1018, 
and  gave  a  great  deal  of  time  and  interest  to  committee  work.  He  was  chairman  of 
Committee  1 — Roadway,  from  1933  to  1038.  He  was  a  director  of  the  Association  from 
1933  to  1936;  vice  president  from  1938  to  1940;  and  president  from  March  1940  until 
the  time  of  his  death.  He  was  also  a  member  of  the  American  Society  of  Civil  Engineers, 
having  just  been  elected  to  membership  in  that  society  in  December  1940. 

His  work  with  the  American  Railway  Engineering  Association  was  outstanding.  He 
was  a  familiar  figure  at  the  annual  conventions  of  the  Association  and  actively  entered 
into  the  discussion  of  committee  reports,  contributing  largely  through  his  constructive 
thinking  and  the  clear  expression  of  his  views.  Mr.  Fanning  had  an  unusual  abiUty  to 
express  himself  forcibly  and  clearly  in  discussing  committee  reports  from  the  floor  of  the 
convention,  and  his  work  with  the  committees  played  an  important  part  in  the 
presentation  of  informative  reports. 

He  was  energetic  in  presenting  new  ideas,  and  strove  constantly  to  improve  the 
work  of  the  committees,  with  the  object  of  strengthening  the  position  of  the  Association 
and  giving  greater  force  and  weight  to  its  conclusions. 

Mr.  Fanning  had  a  thorough  grasp  of  engineering  problems  which  he  always  pre- 
sented in  a  very  forceful  manner;  his  disarming  frankness  and  pleasing  personality  were 
of  great  help  to  him  in  all  of  his  contacts  with  his  superiors,  associates,  public  officials 
and  others.  He  possessed  to  a  marked  degree  the  faculty  of  inspiring  confidence  and 
invariably  insisted  on  obtaining  definite  results.  He  had  a  fine  ability  to  grasp  a  situa- 
tion quickly  and  make  a  prompt  decision.  He  devoted  his  time  to  the  main  essentials 
of  matters  before  him  and  was  willing  to  leave  the  details  to  his  subordinates. 

During  the  portion  of  the  year  in  which  Mr.  Fanning  was  president  of  the  American 
Railway  Engineering  Association  he  was  most  active  and  interested  in  the  work  of  the 
committees.  To  present  his  ideas  effectively,  he  attended  at  least  one  meeting  of  14  of 
the  committees  and  wrote  letters  to  the  chairmen  of  8  others  setting  forth  what  he 
would  have  said  if  he  had  been  present  at  their  meetings. 

During  his  terms  as  vice-president  and  president  of  the  Association  he  was  very 
active  and  helpful  in  the  work  of  the  General  Committee  of  the  Engineering  Divisioii 
of  the  Association  of  American  Railroads  and  also  as  a  member  of  the  Research  Com- 
mittee of  the  General  Committee.  His  ideas  and  suggestions  concerning  the  work  of  the 
General  Committee  and  of  the  Research  Committee  contributed  largely  to  the  building 
up  of  the  organizations  of  these  committees  as  they  now  e.xist. 

Mr.  Fanning  was  a  well  balanced  engineer;  he  combined  practical  knowledge  with 
technical  training  and  these,  together  with  his  pleasing  personaHty,  placed  him  at  the 
top  of  his  profession  where  he  commanded  the  respect  of  all  of  his  colleagues. 

He  was  a  member  of  the  University  of  Michigan  Club,  a  member  of  the  Cleveland 
Chamber  of  Commerce,  and  a  member  of  the  "Cleveland  Roamers",  a  golf  organization 
in  Cleveland  and  vicinity  from  which  he  derived  a  great  deal  of  pleasure.  He  belonged 
at  one  time  to  the  Canterbury  Country  Club  in  Cleveland,  resigning  about  1939  when 
the  acquisition  of  a  farm  in  Western  Pennsylvania  gave  him  a  new  interest.  From  that 
time  on  much  of  his  spare  time  was  occupied  in  the  keenest  of  enjoyment  of  leisure 
hours  on  this  farm  and  in  plans  to  make  this  country  place  in  Pennsylvania  his  home 
after  his  retirement  from  active  professional  life. 

He  was  a  man  of  broad  interests,  and  read  extensively  on  topics  of  a  general  nature 
in  addition  to  engineering  literature.  Although  it  was  not  generally  known  to  many 
associates,  he  possessed  a  natural  talent  for  art  and  mu.sic,  and  the  sketches  which  he 
made  of  scenes  and  objects  that  interested  him  were  of  considerable  merit.  As  a  young 


250  Memoirs 

man  he  played  the  piano  very  well  and  he  was  not  too  busy  to  continue  this  through 
his  later  years. 

Mr.  Fanning  was  deeply  interested  in  young  men,  particularly  in  those  who  entered 
the  engineering  profession,  and  he  was  influential  in  putting  forward  the  recent  amend- 
ment to  the  constitution  of  the  AREA  establishing  the  grade  of  Junior  Member.  Through 
his  sympathetic  interest  he  made  a  lasting  impression  on  a  number  of  young  men  who 
came  to  him  for  assistance  and  who  gained  much  from  his  wise  counsel. 

While  he  was  known  throughout  the  AREA  and  admired  greatly  for  his  professional 
attainments,  and  his  opinions  and  judgment  were  greatly  respected  by  the  membership, 
those  who  knew  Mr.  Fanning  best  admired  him  most  for  those  fine  qualities  of  char- 
acter, moral  integrity,  high  and  noble  purposes  and  for  his  love  of  home  and  family. 
He  was  the  type  of  engineer  and  gentleman  who  attains  the  summit  of  his  profession 
and  whom  the  profession  delights  to  honor.  In  the  untimely  death  of  Mr.  Fanning  the 
Association,  the  engineering  profession  and  the  railroad  industry  have  sustained  great  loss. 

E.  M.  Hastings,  Chairman 
C.  J.  Geyer 

H.  F.  King 

F.  R.  Layng 
F.  E.  Morrow 
W.  H.  Penfield 

Committee  on  Memoir. 


Memoir 
3foi)n  \T.  Jlcufaert 

Died  June  4,  1940 

The  American  Railway  Engineering  Association  records  with  deep  regret  the  death, 
at  New  York,  on  June  4,  1940,  of  Past-President  John  V.  Neubert. 

John  V.  Neubert  was  born  at  Kittanning,  Pa.,  on  July  18,  1876.  Upon  graduation 
from  Pennsylvania  State  College  in  1899  with  the  degree  of  Bachelor  of  Science  in  Civil 
Engineering,  he  entered  the  service  of  the  New  York  Central  &  Hudson  River  Railroad, 
now  a  part  of  the  New  York  Central  System,  with  which  system  he  spent  his  entire 
professional  life. 

Following  his  employment  as  a  clerk  on  July  3,  1899,  his  personality  and  outstanding 
abilities  were  recognized  by  successive  promotions.  In  August,  1899,  he  was  transferred 
to  the  engineering  department  where  he  served  as  chairman,  rodnian  and  inspector  prior 


John  V.  Neubert 

to  being  appointed  assistant  supervisor  of  track  in  September,  1900.  In  May,  1902,  he 
became  supervisor  of  track,  and  in  July,  1903,  assistant  engineer  in  the  office  of  the 
division  engineer  at  Albany,  N.  Y.  In  1907,  he  was  promoted  to  division  engineer  at 
Albany,  and  in  April,  1909,  to  engineer  of  track.  Lines  East  of  Buffalo,  exterior  zone. 
He  became  engineer  maintenance  of  way  of  the  same  territory  in  July,  1920,  with  head- 
quarters at  New  York.  In  October,  1927,  he  was  appointed  chief  engineer  maintenance 
of  way  of  the  New  York  Central  Lines  East  and  West  of  Buffalo,  including  the  Ohio 
Central  Lines,  with  headquarters  as  before  at  New  York.  In  September,  1931,  his  juris- 
diction was  extended  over  the  Cleveland,  Cincinnati,  Chicago  &  St.  Louis  and  the 
Michigan  Central  railroads,  thus  becoming  chief  engineer  maintenance  of  way  of  the 
New  York  Central  System,  which  position  he  held  at  the  time  of  his  death. 

251 


252  Memoirs 

Mr.  Neubert  became  a  member  of  the  American  Railway  Engineering  Association 
in  1911.  He  served  as  a  member  of  Committee  2 — Ballast,  as  a  member  of  Committee  3 
— Ties,  as  a  member  and  for  four  years  as  chairman  of  Committee  4 — Rail,  as  a  member 
and  for  six  years  as  chairman  of  Committee  5 — Track,  as  a  member  of  Committee  26 — 
Standardization,  as  a  member  of  the  Special  Committee  on  Stresses  in  Railroad  Track, 
as  a  member  of  the  Special  Committee  on  Clearances,  and  as  a  member  and  for  two 
years  as  chairman  of  the  Special  Committee  on  Complete  Roadway  and  Track  Structure. 
He  became  a  director  of  the  American  Railway  Engineering  Association  in  1927,  second 
vice-president  in  1930,  first  vice-president  in  1931  and  president  in  1932. 

Mr.  Neubert  displayed  intense  interest  in  the  affairs  of  the  American  Railway  Engi- 
neering Association,  and  gave  unselfishly  and  unstintingly  of  his  time  and  experience  in 
the  furtherance  of  its  activities.  He  was  widely  known,  highly  respected,  and  held  in 
deep  affection  throughout  the  railway  world.  His  abiUty  as  a  railway  engineer  was  only 
enhanced  by  his  many  endearing  human  qualities.  In  addition  to  those  qualities  so 
essential  to  effective  leadership,  he  was  endowed  with  and  had  fully  developed  a  high 
order  of  mental  alertness  which  enabled  him  to  grasp  quickly  the  essential  elements  of 
any  problem  with  which  he  was  confronted.  The  capacity  and  accuracy  of  his  memory 
was  amazing. 

All  who  knew  Mr.  Neubert  will  miss  him  keenly.  By  his  death  the  .\merican  Railway 
Engineering  Association  has  lost  a  valued  member. 

John  E.  Armstrong,  Chairman  F.  E.  Morrow 

C.  B.  Bronson  a.  R.  Wilson 

E.  M.  Hastings  W.  P.  Wiltsee 

Committee  on  Memoir. 


I 


i 


Memoir 

Died  September  8,  1940 

The  American  Railway  Engineering  Association  records  with  deep  regret  the  death 
at  Philadelphia  on  September  8,  1940,  of  Robert  Faries,  a  director  of  the  Association. 

Robert  Faries  was  born  at  Bellwood,  Pa.  November  30,  1881.  Upon  graduation 
from  high  school  at  Altoona,  Pa.,  in  May,  1899,  he  entered  the  service  of  the  Pennsyl- 
vania Railroad  as  a  laborer  in  the  maintenance  of  way  department,  and  his  entire  profes- 
sional career  was  spent  in  the  service  of  that  property. 

His  outstanding  ability  and  leadership  were  recognized  by  successive  promotions  to 
the  position  of  rodman,  transitman,  assistant  supervisor,  supervisor,  division  engineer  and 
superintendent,  and  on  February  15,  1928  he  was  appointed  assistant  chief  engineer- 
maintenance,  which  position  he  held  at  the  time  of  his  death  and  in  which  he  exercised 
general  supervision  over  maintenance  of  way  on  the  Pennsylvania  system. 

As  assistant  chief  engineer-maintenance,  he  was  largely  responsible  for  marked  im- 
provements in  track  conditions  and  reduced  maintenance  expenditures  brought  about  by 
the  stablization   of   roadbed   that   resulted   from   the   comprehensive   system   of   drainage 


Robert  Faries 

which  he  initiated.  He  also  believed  firmly  in  the  mechanization  of  maintenance  of  way 
forces  in  all  departments,  and  because  of  his  leadership  in  this  field  the  Pennsylvania 
became  one  of  the  outstanding  railroads  in  the  use  of  work  equipment.  He  had  an  active 
and  personal  interest  in  the  development  and  advancement  of  younger  men  serving 
under  him,  and  he  gave  freely  of  both  time  and  thought  to  the  building  of  a  strong 
personnel. 

Mr.  Faries  became  a  member  of  the  American  Railway  Engineering  Association  in 
1929.  He  served  as  a  member  of  Committee  27 — Maintenance  of  Way  Work  Equipment; 
the  Special  Committee  on  Stresses  in  Railroad  Track;  Committee  4 — Rail,  of  which 
committee  he  was  vice-chairman  at  the  time  of  his  death ;  and  served  as  chairman  of  tJie 
Committee  on  the  Relation  of  Track  and  Equipment  of  the  Association  of  American 
Railroads  from  the  time  of  its  formation  until  his  death.  He  was  elected  a  director  of 
the  American  Railway  Engineering  Association  in  1939.  During  all  the  years  of  his 
membership  he  was  keenly  interested  in  the  affairs  of  the  Association  and  gave  fully  and 
unselfishly  of  his  time  and  abiUty  to  the  advancement  of  its  interests. 

253 


254  Memoirs ___^_ 

Mr.  Faries  was  widely  known,  and  his  ability  as  a  railroad  maintenance  officer  was 
recognized.  His  long  experience  in  and  practical  knowledge  of  railroad  maintenance  of 
way  problems  and  practices  qualified  him  to  serve  on  and  direct  fact  finding  committees 
representing  the  railroads  in  a  number  of  hearings  before  committees  of  the  United  States 
Senate  and  other  governmental  bodies.  In  this  capacity  he  performed  a  very  valuable 
service  for  the  railroads.  His  now  well  known  testimony  in  the  minimum  wage  hearings 
under  the  provisions  of  the  Fair  Labor  Standards  Act  of  1938  is  outstanding  and  has 
been  frequently  used. 

All  who  knew  Mr.  Faries  miss  him  keenly.  His  unassuming  leadership  won  for  him 
an  enviable  position  in  his  chosen  work  and  endeared  him  to  all  his  associates.  By  his 
death,  the  American  Railway  Engineering  Association  has  lost  a  valued  member,  and  the 
railroad  industry  a  man  who  cannot  well  be  spared. 


i 


Memoir 

Died  August  10,  1940 

Lawrence  Aloysius  Downs  was  born  at  Greencastle,  Ind.,  on  May  9,  1872.  His 
parents  were  James  and  Mary  (McCarthy)  Downs.  He  was  the  youngest  of  a  family 
of  eight — six  sons  and  two  daughters. 

His  earliest  impressions  of  business  or  a  chosen  occupation  were  associated  with 
railroad  operation  through  his  father's  employment  as  a  section  foreman  on  the 
\'^andalia    Railroad,   now    a   part   of   the   Pennsylvania   System. 

The  maintenance  of  a  family  group  of  ten  in  the  late  eighties  necessitated  the  sus- 
tained observance  of  diligence,  thrift  and  resourcefulness.  The  father,  a  strict  dis- 
ciplinarian,  by   the   example  he  set,  instilled  in   his  children   these  qualities  as  well  as 


Lawrence  Aloysius  Downs. 


mutual  helpfulness  and  tolerance.  The  salary  of  the  section  foreman  was  supplemented 
by  the  products  raised  through  work  of  the  children  on  the  small  farm  where  the  family 
lived.  Each  son  and  daughter  was  allotted  tasks  about  the  house  and  farm.  It  is  well 
known  that  these  assignments  when  well  done  received  the  approbation  of  the  superior 
officer.  If  improperly  executed,  the  worker  was  given  another  chance.  During  the  sum- 
mer vacations  the  boys,  when  old  enough,  were  given  jobs  on  the  section  gang  with 
their  father. 

It  was  during   this   early   period   that   Lawrence  Downs  acquired   the   fundamental 
qualities  which  were  so  manifest  in  his  life's  work.  He  entered  heartily  into  all  these 

255 


256 Memoirs 

boyhood  jobs  with  the  definite  assurance  that  he  would  succeed,  and  at  the  same  time 
was  engaged  in  making  a  study  of  some  other  position  he  confidently  hoped  to  occupy. 
This  principle  controlled  his  varied  activities  during  his  many  years  of  railroad  service. 
He  accepted  a  promotion  to  an  office  he  knew  he  was  qualified  to  fill  and  then  began 
an  intimate  study  of  the  duties  and  responsibilities  of  the  next  higher  office  to  which 
he  might  be  appointed. 

Lawrence  Downs  obtained  his  preliminary  educational  training  in  the  pubhc  schools, 
St.  Paul's  Academy  and  DePauw  University  at  Greencastle,  Ind.  He  entered  Purdue 
University  at  Lafayette,  Ind.,  in  1890  and  graduated  in  1894  with  the  degree  of  b.ce. 
He  completed  the  curriculum  for  a  degree  in  engineering  with  distinction  and  acquired 
an  enviable  reputation  in  athletics  and  other  student  activities.  He  was  a  tackle  on  the 
undefeated  Purdue  football  team  in  1892,  was  a  member  of  the  glee  club  and  engaged 
in  debates.  He  was  elected  a  member  of  the  Sigma  Chi  Fraternity  in  his  sophomore  year. 
In  his  senior  year  he  was  elected  president  of  the  University  Athletic  Association,  the 
highest  honor  which  could  be  conferred  on  a  student  by  the  student  body.  Purdue  Uni- 
versity conferred  the  degree  of  Doctor  of  Engineering  on  Lawrence  Downs  in  1929, 
and  Centenary  College  (Shreveport,  La.)   the  degree  of  l.l.d.  in  1931. 

Immediately  after  his  graduation  from  Purdue  University  he  took  his  initial  step 
in  railway  service  by  accepting  the  position  of  rodman  in  an  engineering  party  of  the 
Vandalia  Railroad,  at  a  salary  of  $40  per  month.  In  March  1896  he  entered  the  en- 
gineering department  service  of  the  Illinois  Central  System  as  a  rodman  at  $60  per 
month,  the  beginning  of  a  railroad  service  of  more  than  forty-four  years,  ending  with 
his  death  August  10,  1940,  as  chairman  of  the  board.  His  first  promotion  came  six 
months  after  he  entered  the  service  when  he  was  advanced  to  the  rank  of  instrument- 
man.  A  year  later  he  was  promoted  to  assistant  engineer  and  about  another  year  later 
was  appointed  roadmaster.  During  the  period  1898-1907  he  served  in  this  capacity  on 
four  of  the  operating  divisions  of  the  railroad.  Each  change  as  roadmaster  brought  him 
into  fields  of  more  complex  road  department  problems  and  greater  responsibility. 

His  success  in  handling  division  maintenance  of  way  work  led  to  his  promotion 
to  assistant  chief  engineer  maintenance  of  way,  Illinois  Central  System,  with  supervision 
over  roadway  and  maintenance  work  for  the  entire  system.  Here  was  offered  the  wider 
field  of  studying  the  needs  for  organization,  use  of  materials  and  standards  for  a  north 
and  south  trunk  line  system.  It  was  while  occupying  this  responsible  position  that 
Lawrence  Downs  made  a  decision  which  changed  the  character  of  his  railroad  service 
and  eventually  carried  him  to  the  post  of  greatest  responsibihty  in  the  Illinois  Central 
organization.  His  fourteen  years'  service  in  the  engineering  department  brought  him  in 
intimate  touch  with  the  work  of  the  operating  officers,  and  he  observed  the  rapid 
promotions  made  in  that  department.  He  knew  too  the  position  immediately  ahead  of 
him  was  filled  by  a  capable  young  man  who  without  doubt  would  be  chief  engineer 
for  many  years.  Accordingly,  at  his  own  request,  Mr.  Downs  was  transferred  in  1910, 
at  the  age  of  38,  to  the  operating  department  on  a  division  on  the  western  extremity 
of  the  system.  After  mastering  the  details  of  his  new  position  and  studying  the  needs 
of  divisional  operation  he  devised  ways  and  means  for  presenting  essential  operating  data. 
His  engineering  training  and  experience  impressed  him  with  the  value  of  analytical 
charts  and  diagrams,  and  he  adapted  such  implements  for  his  use.  With  data  compiled 
in  this  manner  the  whole  operation  would  indicate  at  a  glance  where  the  weak  spots 
were  and  what  remedial  measures  should  be  applied.  Under  his  forceful  direction,  in 
two  years  the  Iowa  division  was  deemed  the  model  of  divisional  operation  on  the  system. 
From  1910  to  191S  he  accepted  two  transfers  as  superintendent,  each  being  in  recognition 
of  work  well  done  and  each  successive  assignment  of  greater  responsibility. 


Memoirs 257 

The  success  of  Lawrence  Downs  as  a  superintendent  and  his  abihty  as  an  operating 
officer  was  rewarded  in  1915  by  his  promotion  to  the  office  of  general  superintendent 
on  the  lUinois  Central  System  lines  south  of  the  Ohio  river.  Then  followed  his  transfer 
to  a  similar  position  of  greater  responsibility  on  the  system  lines  north  of  the  Ohio 
river  in  1916,  and  in  1919  his  responsibilities  were  again  increased  by  his  promotion 
to  the  position  of  system  assistant  general  manager. 

In  1920  he  was  elected  vice-president  and  general  manager  of  the  CentraJ  of 
Georgia  Railway,  a  subsidiary  of  the  Illinois  Central,  operating  1,800  miles  of  railroad 
in  Alabama,  Georgia  and  Tennessee.  Four  years  later  he  was  advanced  to  the  presidency 
of  the  Central  of  Georgia  as  weJl  as  its  subsidiary,  the  Ocean  Steamship  Company  of 
Savannah,  a  coastwise  steamship  line  serving  the  ports  of  Savannah,  New  York  and 
Boston.  During  his  term  as  president  directing  the  policy  and  operation  of  these  prop- 
erties they  were  substantially  improved  and  their  earnings  were  increased  beyond  those 
of  any  like  previous  period. 

The  conspicuous  success  of  Lawrence  Downs  as  an  engineer,  minor  operating  officer 
and  chief  executive  railway  officer  won  his  election  as  president  of  the  Illinois  Central 
System  to  succeed  the  late  Charles  H.  Markham,  who  retired  from  the  presidency  of 
the  company  in  September  1926.  Under  Lawrence  Downs'  direction  the  Illinois  Central 
System  pursued  a  progressive  and  Jong  distance  policy;  the  roadbed  and  the  motive 
power  and  equipment  were  improved  to  meet  the  wishes  of  the  public  for  faster  and 
better  passenger  service  and  a  speedier  delivery  of  freight ;  stress  was  placed  on  the  de- 
velopment of  industry  and  agriculture  on  the  Illinois  Central  System  territory;  a  higher 
value  on  the  development  of  foreign  commerce  through  the  gulf  ports;  and  the  use 
of  analytical  charts  disclosing  new  records  of  operating  efficiency. 

Lawrence  Downs  was  "Larry"  to  his  associates  who  grew  up  with  him  in  the 
service  of  the  Illinois  Central  System.  They  had  learned  to  appreciate  "Larry's"  sin- 
cerity, judgment,  fairness  and  integrity.  They  were  delighted  to  witness  his  rapid  ad- 
vancement in  responsibility  in  the  company's  service.  They  worked  as  willingly  and 
diligently  to  advance  the  company's  interests  as  "Larry"  was  earnestly  striving  to 
protect  theirs.  The  relationship  was  not  that  usually  e.xisting  between  the  employer 
and  the  employee.  It  was  that  growing  out  of  the  application  of  the  principles  of  the 
golden  rule. 

On  the  eve  of  the  present  century,  when  the  railroads  of  the  United  States  were 
emerging  from  the  depression  of  1893,  there  was  urgent  need  for  an  engineering  or- 
ganization whose  medium  would  permit  of  the  exchange  of  views  on  railway  engineering 
standards  and  practices.  The  forward  looking  railroad  companies  had  adequate  engineer- 
ing staffs  that  had  developed  good  practices  and  economical  designs  of  track,  bridges 
and  other  structures.  Some  of  them  might  have  been  reluctant  to  permit  the  less  for- 
tunate lines  to  benefit  from  their  work.  The  benefits  of  such  an  organization  so  far 
outweighed  the  loss  to  an  individual  company  that  in  1898  the  leaders  in  railway  con- 
struction and  maintenance  formed  an  organization  which  would  admit  to  its  member- 
ship railway  officers  engaged  in  the  construction  and  maintenance  of  railways  in  the 
United  States,  Canada  and  Mexico.  This  organization  came  into  being  as  the  American 
Railway  Engineering  and  Maintenance  of  Way  Association  (now  the  AREA).  Lawrence 
Downs  was  admitted  to  membership  in  1898  as  Charter  Member  No.  80. 

Mr.  Downs  visualized  the  benefits  accruing  to  such  a  membership.  He  not  only 
anticipated  the  value  to  him  in  his  advancement  in  the  railway  engineering  profession, 
but  also  the  benefits  accruing  to  the  company  that  employed  him.  He  found  out  in  what 
respect  his  fellow  engineers'  designs  and  practices  were  better  than  his,  and  it  gave 
him  an  opportunity  of  contributing  his  full  share  to  the  success  of  railway  engineering. 


MEMOIR 
Milliam  JSenston  ^torep 

Died  October  24,  1940 

William  Benson  Storey  was  born  in  San  Francisco  on  November  17,  1857,  and  spent 
much  of  his  boyhood  in  Colfax,  Placer  County,  Calif.  Following  attendance  at  high 
school  in  Oakland,  he  worked  for  a  year  in  a  railroad  engineering  party  before  entering 
the  newly  established  University  of  California  at  Berkeley,  where  he  took  the  mechanical 
engineering  course  and  from  which  he  graduated  in  1881,  receiving  the  degree  of  Bachelor 
of  Philosophy.  He  married  Laura  B.  Roe  (nee  Rice)  of  San  Francisco  on  May  21,  1913, 
who  died  September  3,  1940.  Mr.  Storey  is  survived  by  a  sister,  Mrs.  J.  F.  Nash  of 
Alameda,  Calif.,  and  a  brother,  Alfred  J.  Storey  of  Humboldt  County,  Calif. 

His  career  following  graduation  from  the  university  was  spent  almost  entirely  in 
railroad  work — in  location  and  construction  parties,  much  of  it  in  the  mountainous 
wilderness  that  was  the  West;  on  lines  that  are  now  parts  of  the  Santa  Fe,  the  Southern 


Pacific  and  the  Union  Pacific  systems;  and  in  reconstruction,  improvement  and  admin- 
istrative work.  In  1894  and  1895  he  was  assistant  engineer  for  the  CaHfornia  Debris 
Commission,  in  the  regulation  of  hydrauhc  mining  debris  discharged  into  streams. 

In  1900  Mr.  Storey  was  appointed  chief  engineer  of  that  portion  of  the  Atchison, 
Topeka  &  Santa  Fe  System  east  of  Albuquerque,  N.  M.,  and  north  of  Purcell,  Okla.,  with 
headquarters  at  Topeka,  Kans.,  and  in  1906  was  promoted  to  chief  engineer  of  the  sys- 
tem, with  headquarters  at  Chicago.  He  was  then,  successively,  vice-president  of  the  Santa 
Fe  from  1909  to  1917,  federal  manager  from  1918  to  1919,  and  president  from  1920  to 
1933,  when  he  resigned  as  president  but  remained  as  a  member  of  the  board  of  directors 
and  of   the   executive   committee. 

Mr.  Storey  was  a  charter  member  and  a  past-president  of  the  American  Railway 
Engineering  Association;  he  served  as  director  in   1911-1912,  second  vice-president  in 

260 


Memoirs 261 

1912-1913,  first  vice-president  in  1913-1914,  and  president  in  1914-1915,  and  was  made 
an  honorary  member  in  1938.  He  also  served  on  the  committees  on  Water  Service  in 
1900-1901,  Ballasting  in  1902-1903  (chairman  in  1903),  Economics  of  Railway  Location 
in  1905-1909  (chairman  in  1908-1909),  and  Cooperative  Relations  with  Universities  in 
1924-1925. 

He  was  a  life  member  of  the  American  Society  of  Civil  Engineers,  a  life  member 
of  the  Western  Society  of  Engineers,  and  a  hfe  member  of  the  American  Society  for 
Testing  Materials.  He  was  given  the  honorary  degree  of  LL.D.  by  the  University  of 
California  in  1924,  and  was  a  member  of  Phi  Beta  Kappa,  Sigma  Xi,  and  Zeta  Psi.  He 
held  memberships  in  the  Pacific  Union  Club  and  the  Bohemian  Club  of  San  Francisco ; 
the  Chicago  Club  and  the  University  Club  of  Chicago ;  and  the  Midday  Club  of  New 
York. 

Among  his  interests  outside  the  fields  of  railroading  and  engineering,  Mr.  Storey  was 
a  director  of  the  Continental  Illinois  National  Bank  &  Trust  Company  and  of  the  Per- 
sonal Loan  &  Savings  Bank,  both  of  Chicago,  and  a  trustee  of  the  Carnegie  Institution 
of  Washington.  Beginning  in  1934  he  was  a  member  of  a  board  of  review  appointed  by 
the  Secretary  of  the  Interior  which  passed  on  plans  for  the  construction  and  improve- 
ment of  the  sewage  purification  works  of  the  Chicago  Sanitary  District.  He  was  also, 
from  1933,  a  member  of  the  board  of  directors  of  the  Chicago  Crime  Commission. 

Mr.  Storey's  unostentatious  interest  in  philanthropic,  cultural  and  educational  work 
is  revealed  by  his  bequests  of  $8,000  each  to  the  Community  Trust,  the  Art  Institute  and 
the  Field  Museum,  of  Chicago,  and  a  gift  of  $25,000  to  the  University  of  California, 
divided  equally  between  the  university  endowment  fund  and  a  fund  for  the  aid  of 
needy  engineering  students. 

A  highly  interesting  autobiography  was  prepared  by  Mr.  Storey  in  1939.  Born  in 
San  Francisco  when  the  epic  days  of  California  were  opening  into  full  flower,  Mr.  Storey 
proved  himself  a  capable  and  worthy  heir  to  the  many  and  great  opportunities  for  service 
and  accomplishment  which  that  era  provided.  The  first  four  decades  of  his  life  were 
filled  with  the  work  and  hardship  associated  with  pioneer  life  and  railroad  reconnaissance, 
construction  and  operation  in  newly  developed  territory,  and  were  only  the  opening 
chapter  of  an  exceptionally  able  and  distinguished  career.  Quiet  and  reserved  by  nature, 
but  with  a  balanced  personality,  his  sterUng  qualities  won  the  highest  regard  and  devo- 
tion of  his  associates  and  a  host  of  his  friends.  Possessed  of  the  concentration  and  energy 
of  a  splendidly  trained  and  disciplined  mind,  and  an  impersonal,  unbiased  and  decisive 
judgment,  he  was  elevated  to  a  position  of  great  responsibility  by  his  high  and  ready 
abilities  vitalized  and  supported  by  integrity,  strength  and  decision  of  character,  and  by 
courage  and  promptness  in  accepting  responsibility,  seizing  initiative  and  giving  leader- 
ship. His  life  and  achievements  constitute  a  tribute  and  monument  to  the  engineering 
profession,  and  his  death  is  a  great  loss  to  his  friends,  to  the  American  Railway  Engi- 
neering Association,  and  to  his  country.  Such  great  and  honorable  success,  such  happy 
exemplification  of  opportunity  and  reward  profusely  written  upon  the  pages  of  the 
American  Way  of  Life,  are  inspiration  and  hope  through  all  the  years  to  every 
generation  of  American  youth. 

Edwin  F.  Wendt,  Chairman 

J.  L.  Campbell 

L.  C.  Fritch 

G.  W.  Harris 

G.    W.    KlTTREDCE 

C.  A.  Morse 

Committee  on  Memoir. 


Memoirs 


William  Benson  Storey 

(Ab  aotobiograidiy,  rqwinted  with  p^enniiifon  from  the  Journal  of  the  Western  Society 

of  Errrtr  _:   ::r  February  IWO; 

Bom  in  San  Frandsco,  Calif.,  on  November  17,  1857,  I  remember  very  little  of 
■qr  early  years  except  that  we  fived  in  various  places.  Finally,  in  1S66,  we  located  in 
Colfaz,  a  small  town  in  the  foothiDs  of  the  Serra  Ne\~ada  mountains,  in  Placer  county, 
CaSL  Has  was  then  the  terminus  of  the  Central  Padnc  Railroad  which  was  buUding 
from  jSjyi-»"M^»ft  eastward  over  the  mountains  toward  a  connection  with  the  Union 
Piadfic  to  form  the  first  transcontinental  road  and.  late  in  1S65.  the  line  had  been 
comi^eted  to  CoHax.  a  distance  of  54  miles. 

My  fa&a  was  express,  stage  and  news  agent  and  early  put  me  to  work,  llrst  in 
ddlvuing  the  daOjr  newsp^ieis  about  the  town  and  later  in  assisting  him  in  the  express 
biwiiifws  the  princ^nl  work  of  which  was  to  transfer  express  matter  from  stage  to 
tniB  and  from  train  to  stage.  The  express  office  was  located  at  the  railroad  station  and, 
early  in  Hfe,  I  became  famiBar  with  the  details  of  railroad  practices.  .As  the  trains  and 
stages  arrived  in  the  manuD^  and  evenings,  I  was  able  to  do  the  work  required  with- 
ovt  nterference  with  scfaotd  hours.  I  attended  the  village  school  until  1574.  when  I  was 
tad.  to  Oakland,  idiere  I  entered  the  high  school  and  where  I  remained  for  three  years 
OBtfl  I  was  gtadnated. 

Dming  these  three  years  I  lived  in  pri\-ate  famihes  where,  for  work  out  of  school 
hours,  I  was  pven  room  and  board.  In  the  sununet-  vacation  of  1S76  I  began  my  first 
work  in  an  engineoing  party.  The  State  University  had  just  been  established  at  Berke- 
ley, north  of  Oakland,  and  a  railroad  was  being  constructed  to  serve  the  new  com- 
Bonity.  I  was  given  a  position  as  stake  driver  and  at  the  end  of  the  vacation  found  I 
had  earned  twenty  floDars.  The  last  two  years  of  my  stay  in  Oakland  I  lived  in  the 
fanily  of  the  dnef  ex^ineer  of  the  Central  Pacific  Railroad  and  my  experience  there, 
toerlhci  with  the  fact  that  I  found  geom^iy  and  trigonometry  ver>-  easy,  probably  first 
tamed  my  mind  toward  the  engineering  profession. 

I  recognized,  however,  that  an  engineer  requires  an  education,  and  that  at  &TSt 
seemed  beyond  my  readi,  since  my  faXba  was  not  able  to  send  me  to  college.  I  finally 
deddcd  to  go  to  work  for  a  year  and  then  by  ii«ang  the  money  thus  earned  and  with 
what  I  had  succeeded  in  saving  while  a  boy  in  Colfax,  I  could  manage  to  get  in  two 
years  at  the  University.  I  pased  the  entrance  examination  at  the  iuuver5it>-  and  then 
went  to  w(»k  with  an  engineering  party,  on  construction,  where  I  worked  for  about  four- 
teen months  until  the  opening  of  the  next  college  year.  I  entered  the  university  in  1878 
and  devoted  myself  largdy  to  studies  that  would  be  useful  to  me  as  an  engineer.  .At  the 
end  of  the  two  years'  course  I  found  I  could  be  graduated  with  one  year  more  of  work. 
l^Mm  omsultation  with  my  fatha,  he  offered  to  loan  me  enough  to  carry  me  through, 
and  so  I  remained  the  additional  year  and  was  graduated,  not  as  a  d\-il  engineer,  but 
with  degree  of  Bachdor  of  Philosophy  in  the  class  of  1881.  While  at  college,  with  my 
year's  experience  on  raflroad  construction  before  me,  I  had  reached  the  conclusion  that 
my  dedaon  to  ftdlow  civil  engineering  as  a  profession  was  a  mistake,  since  the  openings 
were  few,  the  returns  anall  and  the  future  very  uncertain.  It  should  be  explained  that 
at  that  period  there  were  only  two  important  organizations  in  CaHfomia  that  had  need 
lor  engineers— the  Central  Pacific  Railroad  and  the  Spring  Valley  Water  Company,  that 
**4H^^  water  to  San  Frandsco — and  these  companies  employed  only  a  limited  number. 
^^"'"'g  oi  these  facts  I  did  not  take  the  dvil  engineering  course,  but  instead,  the 
engineering.  As  I  had  had  in  my  year's  work  on  railroad  construction  more 


Memoirs 263 

practice  in  the  use  of  instruments  and  in  surv-e>Tng  than  was  given  in  the  university 
course.  I  felt  it  would  be  a  waste  of  time  to  go  over  this  work  in  the  d\-il  engineering 
course  and  that  I  could  gain  more  theoretical  knowledge  in  the  mechanical  course.  Fate, 
however,  overruled  me  and  I  became  a  d\-il  engineer  in  spite  of  myself. 

.\fter  graduation  it  was  ver>-  necessary-  that  I  find  some  kind  of  work,  as  I  had  no 
money  and  I  owed  my  father  about  five  hundred  dollars.  I  learned  that  a  sur\-e>-ing 
party  was  about  to  be  sent  into  Idaho  by  the  Central  Pacific,  and  since  there  was  no 
other  work  in  sight,  I  applied  for  and  obtained  a  position  as  rodman.  As  it  was  leaving 
several  days  before  commencement,  I  was  forced  to  miss  that  great  day  in  a  young 
man's  life.  Since  I  had  passed  all  final  examinations,  this  did  not  affect  my  graduation. 

We  were  sent  to  a  point  on  the  railroad  in  Utah  north  of  Great  Salt  Lake  and  made 
a  reconnaissance  sur\-ey  north  into  Idaho  looking  for  a  possible  route  into  Oregon.  We 
went  north  to  a  pass  in  the  mountains  separating  the  Great  Salt  lake  and  Snake  River 
drainages,  down  Raft  river  to  the  Snake,  across  the  Snake  river  desert  to  Wood  river,  up 
that  valley  to  its  source,  over  a  divide  into  the  Salmon  River  country  along  the  easterly 
base  of  the  Sawtooth  range,  and  finally  reached  a  point  beyond  which  it  was  exidently 
impracticable  to  bmld  a  railroad.  We  had  a  wagon  and  a  mule  team,  but  as  the  wagon 
road  ended  at  Ketchum.  a  town  at  the  head  of  Wood  river,  we  then  had  to  convert  our 
team  and  riding  animals,  seven  in  all,  into  a  pack  train  and  I  was  detailed  as  swamper 
to  our  teamster,  who  was  head  packer.  We  went  with  the  pack  train  125  miles  beyond 
Ketchum  and  through  what  is  known  as  Sun  Valley — a  skiing  resort  now  being  exploited 
by  the  Union  Pacific.  We  retraced  our  route  to  the  railroad  and  there  found  further  in- 
structions awaiting  us.  We  were  to  go  to  South  pass  in  the  Rocky  mountains. 

We  shipped  our  outfit  to  Ogden,  Utah,  and  then  added  another  wagon  and  mules; 
purchased  supplies,  made  certain  changes  in  personnel  and  went  to  South  pass  via.  the 
Union  Pacific  to  Green  River  and  from  there  overland.  Our  instructions  were  to  make 
a  reconnaissance  survey  from  the  summit  at  Souch  pass  toward  Yankton,  Dakota.  We 
found  out  later  that  our  survey  was  only  a  demonstration  and  that  it  was  part  of  a 
game  being  played  by  the  heads  of  the  Central  Pacific  and  Union  Pacific  railroads.  The 
Union  Pacific  was  back  of  a  plan  to  bmld  another  road  over  the  Sierras  from  Salt  Lake 
into  California  and  had  seven  parties  in  the  field  surveying  for  such  a  line.  When  this 
became  known  the  Central  Pacific  people  sent  out  three  parties,  one  from  a  point  on  its 
line  to  survey  to  South  Pass,  ours  from  South  Pass  eastward,  and  one  from  Yankton  to 
work  west  to  a  connection  with  us.  Much  publicity  was  given  in  the  newspapers  about 
our  survey  and  the  excellent  route  we  were  finding,  although  as  a  matter  of  fact  we  had 
sent  in  no  report.  This  publicity  was  e%idently  to  impress  the  head  of  the  Union  Pacific 
and  in  the  end  led  to  an  agreement  between  the  two  roads.  Each  dropped  its  plans  for 
building  into  the  territory  served  by  the  other  and  they  united  in  bu>-ing  a  controlling 
interest  in  the  St.  Louis  &  San  Francisco,  which.  Jointly  with  the  Atchison,  Topeka  & 
Santa  Fe.  was  buUding  the  .\tlantic  &  Pacific  west  from  Albuquerque,  X.  M.,  toward 
California.  .\s  co-owner  of  the  Atlantic  &  Pacific,  the  two  northern  roads  then  forced 
the  latter  to  stop  at  the  Colorado  river,  while  the  Southern  Pacific,  which  was  owned  by 
the  Central  Pacific  people,  built  from  its  line  at  Mojave  to  connect  ynth  the  Atlantic  & 
Pacific  at  Needles.  The  Southern  Pacific  had  shortly  before  connected  its  line  with  lines 
in  Texas  and  this  connection  at  the  Cahfomia-Arizona  boundary  made  the  third  overland 
route,  but  with  the  Central-Southern  Pacific  ha\-ing  control  of  all  rail  entrance  to 
CaKfomia. 

Our  survey  followed  the  course  of  the  Sweetwater  river  for  a  certain  distance, 
crossed  over  a  di\-ide  to  what  was  known  as  Horse  creek  and  to  the  North  Platte,  down 
that  stream  to  Fort  Fettennan,  passing  on  the  way  the  remains  of  old  Fort  Casper,  near 


262  Memoirs 


William  Benson  Storey 

(An  autobiography,  reprinted  with  permission  from  the  Journal  of  the  Western  Society 
of  Engineers  for  February  1940; 

Born  in  San  Francisco,  Cahf.,  on  November  17,  1857,  I  remember  very  Uttle  of 
my  early  years  except  that  we  lived  in  various  places.  Finally,  in  1866,  we  located  in 
Colfax,  a  small  town  in  the  foothills  of  the  Sierra  Nevada  mountains,  in  Placer  county, 
Calif.  This  was  then  the  terminus  of  the  Central  Pacific  Railroad  which  was  building 
from  Sacramento  eastward  over  the  mountains  toward  a  connection  with  the  Union 
Pacific  to  form  the  first  transcontinental  road  and,  late  in  1865,  the  line  had  been 
completed  to  Colfax,  a  distance  of  54  miles. 

My  father  was  express,  stage  and  news  agent  and  early  put  me  to  work,  first  in 
delivering  the  daily  newspapers  about  the  town  and  later  in  assisting  him  in  the  express 
business,  the  principal  work  of  which  was  to  transfer  express  matter  from  stage  to 
train  and  from  train  to  stage.  The  express  office  was  located  at  the  railroad  station  and, 
early  in  life,  I  became  familiar  with  the  details  of  railroad  practices.  As  the  trains  and 
stages  arrived  in  the  mornings  and  evenings,  I  was  able  to  do  the  work  required  with- 
out interference  with  school  hours.  I  attended  the  village  school  until  1874,  when  I  was 
sent  to  Oakland,  where  I  entered  the  high  school  and  where  I  remained  for  three  years 
until  I  was  graduated. 

During  these  three  years  I  lived  in  private  families  where,  for  work  out  of  school 
hours,  I  was  given  room  and  board.  In  the  summer  vacation  of  1876  I  began  my  first 
work  in  an  engineering  party.  The  State  University  had  just  been  established  at  Berke- 
ley, north  of  Oakland,  and  a  railroad  was  being  constructed  to  serve  the  new  com- 
munity. I  was  given  a  position  as  stake  driver  and  at  the  end  of  the  vacation  found  I 
had  earned  twenty  dollars.  The  last  two  years  of  my  stay  in  Oakland  I  lived  in  the 
family  of  the  chief  engineer  of  the  Central  Pacific  Railroad  and  my  experience  there, 
together  with  the  fact  that  I  found  geometry  and  trigonometry  very  easy,  probably  first 
turned  my  mind  toward  the  engineering  profession. 

I  recognized,  however,  that  an  engineer  requires  an  education,  and  that  at  first 
seemed  beyond  my  reach,  since  my  father  was  not  able  to  send  me  to  college.  I  finally 
decided  to  go  to  work  for  a  year  and  then  by  using  the  money  thus  earned  and  with 
what  I  had  succeeded  in  saving  while  a  boy  in  Colfax,  I  could  manage  to  get  in  two 
years  at  the  University.  I  passed  the  entrance  examination  at  the  university  and  then 
went  to  work  with  an  engineering  party,  on  construction,  where  I  worked  for  about  four- 
teen months  until  the  opening  of  the  next  college  year.  I  entered  the  university  in  1878 
and  devoted  myself  largely  to  studies  that  would  be  useful  to  me  as  an  engineer.  At  the 
end  of  the  two  years'  course  I  found  I  could  be  graduated  with  one  year  more  of  work. 
Upon  consultation  with  my  father,  he  offered  to  loan  me  enough  to  carry  me  through, 
and  so  I  remained  the  additional  year  and  was  graduated,  not  as  a  civil  engineer,  but 
with  degree  of  Bachelor  of  Philosophy  in  the  class  of  1881.  While  at  college,  with  my 
year's  experience  on  railroad  construction  before  me,  I  had  reached  the  conclusion  that 
my  decision  to  follow  civil  engineering  as  a  profession  was  a  mistake,  since  the  openings 
were  few,  the  returns  small  and  the  future  very  uncertain.  It  should  be  explained  that 
at  that  period  there  were  only  two  important  organizations  in  California  that  had  need 
for  engineers — the  Central  Pacific  Railroad  and  the  Spring  Valley  Water  Company,  that 
supplied  water  to  San  Francisco — and  these  companies  employed  only  a  limited  number. 
Because  of  these  facts  I  did  not  take  the  civil  engineering  course,  but  instead,  the 
mechanical  engineering.  As  I  had  had  in  my  year's  work  on  railroad  construction  more 


Memoirs 263 

practice  in  the  use  of  instruments  and  in  surveying  than  was  given  in  the  university 
course,  I  felt  it  would  be  a  waste  of  time  to  go  over  this  work  in  the  civil  engineering 
course  and  that  I  could  gain  more  theoretical  knowledge  in  the  mechanical  course.  Fate, 
however,  overruled  me  and  I  became  a  civil  engineer  in  spite  of  myself. 

After  graduation  it  was  very  necessary  that  I  find  some  kind  of  work,  as  I  had  no 
money  and  I  owed  my  father  about  five  hundred  dollars.  I  learned  that  a  surveying 
party  was  about  to  be  sent  into  Idaho  by  the  Central  Pacific,  and  since  there  was  no 
other  work  in  sight,  I  applied  for  and  obtained  a  position  as  rodman.  As  it  was  leaving 
several  days  before  commencement,  I  was  forced  to  miss  that  great  day  in  a  young 
man's  life.  Since  I  had  passed  all  final  examinations,  this  did  not  affect  my  graduation. 

We  were  sent  to  a  point  on  the  railroad  in  Utah  north  of  Great  Salt  Lake  and  made 
a  reconnaissance  survey  north  into  Idaho  looking  for  a  possible  route  into  Oregon.  We 
went  north  to  a  pass  in  the  mountains  separating  the  Great  Salt  lake  and  Snake  River 
drainages,  down  Raft  river  to  the  Snake,  across  the  Snake  river  desert  to  Wood  river,  up 
that  valley  to  its  source,  over  a  divide  into  the  Salmon  River  country  along  the  easterly 
base  of  the  Sawtooth  range,  and  finally  reached  a  point  beyond  which  it  was  evidently 
impracticable  to  build  a  railroad.  We  had  a  wagon  and  a  mule  team,  but  as  the  wagon 
road  ended  at  Ketchum,  a  town  at  the  head  of  Wood  river,  we  then  had  to  conve-t  our 
team  and  riding  animals,  seven  in  all,  into  a  pack  train  and  I  was  detailed  as  swamper 
to  our  teamster,  who  was  head  packer.  We  went  with  the  pack  train  125  miles  beyond 
Ketchum  and  through  what  is  known  as  Sun  Valley — a  skiing  resort  now  being  exploited 
by  the  Union  Pacific.  We  retraced  our  route  to  the  railroad  and  there  found  further  in- 
structions awaiting  us.  We  were  to  go  to  South  pass  in  the  Rocky  mountains. 

We  shipped  our  outfit  to  Ogden,  Utah,  and  then  added  another  wagon  and  mules; 
purchased  supplies,  made  certain  changes  in  personnel  and  went  to  South  pass  via  the 
Union  Pacific  to  Green  River  and  from  there  overland.  Our  instructions  were  to  make 
a  reconnaissance  survey  from  the  summit  at  South  pass  toward  Yankton,  Dakota.  We 
found  out  later  that  our  survey  was  only  a  demonstration  and  that  it  was  part  of  a 
game  being  played  by  the  heads  of  the  Central  Pacific  and  Union  Pacific  railroads.  The 
Union  Pacific  was  back  of  a  plan  to  build  another  road  over  the  Sierras  from  Salt  Lake 
into  California  and  had  seven  parties  in  the  field  surveying  for  such  a  line.  When  this 
became  known  the  Central  Pacific  people  sent  out  three  parties,  one  from  a  point  on  its 
line  to  survey  to  South  Pass,  ours  from  South  Pass  eastward,  and  one  from  Yankton  to 
work  west  to  a  connection  with  us.  Much  publicity  was  given  in  the  newspapers  about 
our  survey  and  the  excellent  route  we  were  finding,  although  as  a  matter  of  fact  we  had 
sent  in  no  report.  This  publicity  was  evidently  to  impress  the  head  of  the  Union  Pacific 
and  in  the  end  led  to  an  agreement  between  the  two  roads.  Each  dropped  its  plans  for 
building  into  the  territory  served  by  the  other  and  they  united  in  buying  a  controlling 
interest  in  the  St.  Louis  &  San  Francisco,  which,  jointly  with  the  Atchison,  Topeka  & 
Santa  Fe,  was  building  the  Atlantic  &  Pacific  west  from  Albuquerque,  N.  M.,  toward 
California.  As  co-owner  of  the  Atlantic  &  Pacific,  the  two  northern  roads  then  forced 
the  latter  to  stop  at  the  Colorado  river,  while  the  Southern  Pacific,  which  was  owned  by 
the  Central  Pacific  people,  built  from  its  line  at  Mojave  to  connect  with  the  Atlantic  & 
Pacific  at  Needles.  The  Southern  Pacific  had  shortly  before  connected  its  line  with  lines 
in  Texas  and  this  connection  at  the  California-Arizona  boundary  made  the  third  overland 
route,  but  with  the  Central-Southern  Pacific  having  control  of  all  rail  entrance  to 
California. 

Our  survey  followed  the  course  of  the  Sweetwater  river  for  a  certain  distance, 
crossed  over  a  divide  to  what  was  known  as  Horse  creek  and  to  the  North  Platte,  down 
that  stream  to  Fort  Fetterman,  passing  on  the  way  the  remains  of  old  Fort  Casper,  near 


264  Memoirs 

what  is  now  Casper  City,  crossed  to  the  head  waters  of  the  Niobrara,  followed  the  gen- 
eral course  of  that  stream  but  on  the  upper  ground  to  the  south  and  finally  to  a  junction 
with  the  line  of  the  Yankton  party  near  Stuart,  Neb.,  a  distance  of  over  400  miles.  The 
country  was  only  sparsely  settled,  there  being  no  farms  and  only  occasionally  a  cattle- 
man's headquarters.  There  were  herds  of  antelope  near  the  west  end  and  more  and  more 
cattle  as  we  moved  east.  We  sold  our  wagons  and  animals  and,  going  by  rail  to  a  junc- 
tion with  the  Union  Pacific,  thence  returned  to  San  Francisco.  On  the  way  back  we 
were  delayed  for  nearly  48  hours  by  a  snow  blockade  on  the  Union  Pacific.  The  entire 
survey  had  been  driven  through  as  rapidly  as  possible,  since  there  was  danger  of  winter 
overtaking  us,  and  it  was  fortunate  that  we  finished  when  we  did,  otherwise  we  would 
have  been  caught  in  the  blizzard  that  struck  us  on  the  Union  Pacific,  and  with  no 
habitations  in  the  country  we  would  have  had  great  difficulty  in  getting  out.  I  was  still 
further  convinced  that  the  life  of  a  civil  engineer  was  a  hard  one  and  this  confirmed  me 
in  my  earlier  decision  not  to  follow  that  profession. 

However,  after  a  few  weeks  in  San  Francisco,  when  offered  further  work  on  a  survey 
to  investigate  the  approach  to  Yosemite  valley,  I  accepted  and  spent  several  months 
still  working  as  a  rodman.  When  the  survey  was  done  I  assisted  in  mapping  the  country 
we  had  covered. 

In  the  spring  of  1882  I  was  given  a  position  as  levelman  on  surveys  for  the  road 
toward  Oregon.  We  worked  all  summer  near  Mt.  Shasta,  running  lines  from  the  Shasta 
summit  north  to  the  Klamath  valley  and  south  well  down  into  the  canyon  of  the  Sacra- 
mento. At  the  end  of  the  season  we  were  called  in,  and  while  I  do  not  recall  how  I  was 
employed  that  winter,  it  was  probably  in  working  up  estimates  on  our  summer's  work. 

The  following  spring  construction  was  begun  on  the  extension  of  the  Central  Pacific, 
toward  Oregon,  from  Redding  at  the  upper  end  of  the  Sacramento  valley  through  the 
Sacramento  canyon.  This  work  was  heavy,  the  hne  was  very  crooked,  the  cuts  were  of 
rock,  with  many  tunnels  and  crossings  of  the  river.  Each  engineer  had  charge  of  about 
six  miles  and  I  was  given  charge  of  the  third  section,  which  included  two  tunnels.  When 
this  was  finished  I  was  moved  farther  up  the  river  and  on  a  section  that  had  one  tunnel. 
This  construction  work  was  carried  on  for  a  year  and  then,  for  financial  reasons,  was 
stopped  and  all  engineering  parties  called  in. 

In  the  winter  of  1883-84,  excessive  rains  and  floods  caused  much  damage  to  the 
Southern  Pacific  in  southern  California  when  miles  of  track  were  washed  out  in  Soledad 
canyon,  north  of  Los  Angeles.  In  Arizona  the  Gila  river  destroyed  many  miles  of  track 
east  of  Yuma  and  in  Texas  the  Rio  Grande  caused  damage  for  SO  miles  east  of  El  Paso. 
The  line  through  Soledad  canyon  was  relocated  and  I  was  employed  for  some  weeks  in 
making  plans  for  new  masonry  piers  and  abutments.  I  was  then  sent  to  the  hne  east  of 
El  Paso  to  give  center  and  grade  stakes  for  rebuilding  the  fills  that  had  been  washed  away. 

I  was  also  sent  to  Yuma  to  retrace  the  original  located  hne  along  the  Gila  and  to 
cross-section  this  line  for  graders.  At  the  time  the  Une  was  originally  built  it  was  located 
above  high  water,  but  this  entailed  much  heavier  work  than  a  line  in  the  bottom  land. 
Due  to  difference  in  cost,  it  was  decided  to  build  the  cheaper  line  and  take  the  chance 
of  being  flooded  in  the  near  future.  However,  the  flood  had  come  and  taken  out  about 
twenty  miles  of  track.  While  this  had  been  replaced  temporarily  it  was  the  intention  to 
build  permanently  on  the  old  and  safe  location.  But  after  I  retraced  this  line  and  pre- 
pared plans  for  construction  the  authorities  decided  not  to  build  at  that  time,  as  floods 
were  assumed  to  come  long  distances  apart  and,  money  being  scarce,  the  new  work 
could  be  deferred  until  times  were  more  propitious,  while  in  the  meantime  the  old  line 
would  serve. 


Memoirs 265 

I  was  next  instructed  to  investigate  the  grade  on  Tehachapi  mountain.  This  Hne 
had  been  located  on  a  2.2  percent  grade  basis  with  compensation  of  0.02  per  degree.  The 
line  had  many  miles  of  development  and  was  nearly  all  curves — a  majority  being  ten 
degrees.  The  original  location  of  the  Central  Pacific  over  the  Sierra  Nevadas  was  made 
on  the  same  grade  basis  as  a  maximum  but  without  any  compensation.  The  operating 
department  reported  that  identical  locomotives  could  haul  more  tonnage  over  the  Central 
Pacific  than  up  the  Tehachapi.  I  therefore  undertook  to  find  out  why  this  should  be. 
First  I  reestablished  the  original  SO-ft.  stations,  and  then  took  levels  on  top  of  each  rail 
at  each  station  and  platted  these,  thus  getting  the  mean  grade  line.  I  found  the  grade  in 
many  places,  on  the  ten-degree  curves,  as  high  as  2.5  percent  or  higher  and  in  such 
places  the  grades  on  succeeding  tangents  were  less  than  2  percent.  Most  of  such  exces- 
sive gradients  were  on  high  fills.  The  high  fills  had  settled  during  the  first  years  after 
construction  and  in  filling  up  this  settlement,  without  stakes  to  guide  them,  the  trackmen 
had  overfilled,  since  the  curves  prevented  sighting  with  the  eye,  which  is  the  usual 
method  of  the  trackman.  As  the  grades  on  the  fills  were  too  steep  there  naturally  had 
to  be  compensation  on  the  tangents. 

Following  these  pieces  of  work  a  reorganization  of  the  engineering  department  took 
place.  The  entire  staff  was  dispensed  with,  excepting  only  men  on  work  not  yet  finished. 
The  chief  engineer  was  kit  in  charge  of  the  engineering  office  and  records,  the  balance 
of  the  men  found  themselves  without  work.  With  another  engineer,  I  then  opened  an 
office  in  San  Francisco  under  the  name  of  Palmer  and  Storey.  During  the  time  this  firm 
was  in  existence  we  built  two  short  lines  of  railroad,  one  in  Colusa  county  and  one  in 
Monterey  county.  Mr.  Palmer  was  in  charge  in  the  field  and  I  was  in  the  office,  but  the 
returns  were  small  and  prospects  of  future  work  were  poor.  Therefore,  when  the  South- 
ern Pacific  offered  me  work  in  charge  of  location  and  construction  of  a  short  line  of 
road  in  the  San  Joaquin  valley,  I  accepted  and  the  partnership  was  dissolved.  After 
this  construction  was  finished  I  was  offered  the  position  of  locating  engineer  on  a  line 
that  started  on  the  main  line  of  the  Southern  Pacific  at  a  station  called  Saugus,  north  of 
Los  Angeles,  ran  down  the  Santa  Clara  valley  to  the  coast  at  Ventura,  up  the  coast  to 
Santa  Barbara  and  then  on  to  San  Luis  Obispo  and  over  the  mountain  to  a  connection 
with  the  Southern  Pacific  line  already  built  south  to  a  station  called  Templeton.  I 
accepted  this  position  and  was  engaged  on  this  work  for  about  a  year  during  1886-1887. 
This  line  from  Ventura  north  is  now  part  of  the  through  Coast  Line  of  the  Southern 
Pacific  from  Los  Angeles  to  San  Francisco. 

In  1888  I  was  sent  to  Washington,  which  was  then  a  territory,  to  build  a  short  line 
up  the  canyon  of  the  Carbonado  river  connecting  the  Northern  Pacific  with  the  coal  mine 
owned  by  the  Southern  Pacific.  This  was  only  about  six  miles  long,  but  the  work  was 
heavy  and  it  took  me  until  early  in  1889  to  complete  it.  It  was  then  turned  over  to  the 
Northern  Pacific  under  an  agreement  by  which  that  road  was  to  pay  for  it  out  of  the 
freight  earnings. 

Between  1889  and  1893  I  had  charge  of  building  two  branch  lines,  one  extending 
from  Knights  Landing  on  the  Sacramento  river  in  California,  across  what  is  known  as 
Sutter  basin,  to  the  Feather  river  and  connecting  with  a  line  which  had  been  built  south 
from  the  City  of  Marysville;  the  other  between  Merced,  on  the  main  line  of  the  South- 
ern Pacific  in  the  San  Joaquin  valley  to  Oakdale  in  Stanislaus  county,  where  it  connected 
with  a  line  from  Stockton,  thus  forming  a  loop  line  from  Stockton  to  Merced  which 
opened  up  some  fine  agricultural  land.  I  also  built  two  stretches  of  the  Southern  Pacific 
in  Arizona,  one  extending  east  from  Yuma  for  35  miles,  where  excessive  floods  on  the 
Gila  river  had  again  taken  out  the  original  track  for  that  distance,  and  the  other  east 


266 Memoirs 

of  Tucson  to  Dragoon  summit,  where  the  original  line  was  built  on  a  1.5  percent  basis, 
and  it  was  decided  to  put  in  one  on  a  1  percent  basis  in  order  to  make  it  conform  with 
the  grade  system  on  the  rest  of  the  division. 

In  between  these  pieces  of  work  I  made  examination  of  and  reported  on  sections 
of  the  country  not  then  served  by  the  railroad.  One  of  these  was  the  canyons  of  the 
two  forks  of  Feather  river  which  afforded  a  railroad  route  to  the  Beckwith  pass  in  the 
Sierra  Nevada  mountains,  which  pass  is  about  1,800  ft.  lower  than  the  pass  used  by  the 
Central,  now  known  as  the  Southern  Pacific.  This  route  has  since  been  occupied  by 
the  Western  Pacific,  using  the  north  fork  of  the  Feather  river.  The  trip  through  this 
canyon  was  a  particularly  hard  one.  I  had  to  make  it  on  foot  and  it  took  me  six  days 
from  Oroville  at  the  mouth  of  the  canyon  to  Quincy  in  Plumas  county,  the  first  town 
after  emerging  from  the  canyon.  There  were  no  trails  in  the  canyon  and  I  carried  my 
supplies  on  my  back  and  slept  on  the  banks  of  the  river,  without  blankets.  The  trip 
down  the  middle  fork  was  equally  hard. 

In  the  summer  of  1893  I  was  sent  to  run  a  survey  through  the  desert  from  San 
Gorgonio  pass  on  the  Southern  Pacific  to  a  connection  with  the  Santa  Fe  at  or  near  the 
station  of  Cadiz.  I  made  a  preliminary  exploration  to  locate  water  holes  and  then  or- 
ganized a  party  and  began  the  survey.  I  had  asked  for  a  sixty-day  leave,  beginning  in 
time  to  enable  me  to  attend  the  convention  of  the  American  Society  of  Civil  Engineers 
in  Chicago.  This  was  granted  and,  therefore,  before  this  survey  was  finished  I  went  to 
Chicago,  attended  the  convention  and  visited  the  World's  Fair  of  that  year.  I  then  visited 
Boston,  New  York  and  Washington,  and  came  back  to  San  Francisco  to  find  that  there 
was  no  further  work  for  me.  In  my  absence  the  panic  of  1893  had  struck  the  country 
and,  as  a  consequence,  all  construction  work,  not  only  on  railroads  but  in  every  other 
line,  had  stopped.  I  could  find  no  work  of  any  kind  for  several  months. 

In  the  spring  of  1894  I  obtained  a  position  as  assistant  engineer  on  the  California 
Debris  Commission.  This  commission  had  recently  been  formed  to  regulate  hydraulic 
mining  and  prevent  debris  from  being  discharged  into  the  navigable  rivers  of  the  state. 
It  was  made  up  of  army  engineers,  with  headquarters  in  San  Francisco.  My  duties  were 
to  inspect  the  impounding  works  authorized  by  the  commission  and  to  see  that  the  min- 
ing companies  did  not  evade  the  law.  I  was  engaged  on  this  work  and  required  to  live 
in  the  mountains  for  about  a  year. 

Early  in  1895  a  railroad  company  was  organized  to  build  a  railroad  from  San 
Francisco  down  the  San  Joaquin  valley  and  I  applied  for  and  obtained  the  position  of 
chief  engineer.  The  task  presented  was  to  find  a  way  over  the  Coast  Range  into  the  San 
Joaquin  valley  and  through  this  valley  to  its  southern  end,  a  total  distance  of  over 
three  hundred  miles,  to  tap  only  the  most  important  towns  in  the  valley  and  to  other- 
wise place  the  Hne  a  sufficient  distance  from  the  existing  lines  of  the  Southern  Pacific 
(the  only  other  railroad)  to  enable  new  business  to  be  opened  up,  also  to  provide  ter- 
minals on  San  Francisco  bay.  This  was  accomplished  with  a  grade  maximum  of  1  per- 
cent for  a  distance  of  about  twenty-seven  miles  from  San  Francisco  bay  and  a  maximum 
of  0.3  percent  for  the  balance  of  the  distance.  Two  difficult  engineering  problems  pre- 
sented themselves  on  this  work,  one  the  swelling  ground  in  the  1%  mile  summit  tunnel 
and  the  other,  building  over  swamp  and  overflow  land  at  the  mouth  of  the  San  Joaquin 
for  a  distance  of  about  sixteen  miles. 

The  swelling  ground  was  caused  by  the  rock  absorbing  moisture  from  the  air  and 
acting  similar  to  slaking  lime.  We  first  tried  to  hold  this  by  additional  timber  lining,  but 
the  timbers  broke  like  matches.  We  then  adopted  the  plan  of  timbering  lightly  and,  when 
the  squeeze  came,  removing  the  lagging  and  excavating  back  of  the  timbers.  This  pre- 
vented crushing  for  a  time,  but  finally   the  pressure  above  and  below  would  get  too 


Memoirs 267 

great  and  the  main  timbers  would  break.  We  then  would  remove  the  entire  set  of  tim- 
bers, excavate  back  of  them  and  put  in  a  new  set.  The  time  between  each  squeeze  be- 
came longer  until  after  we  had  renewed  the  sets  in  the  center  of  the  tunnel  five  times  the 
squeeze  ceased  entirely.  As  we  approached  the  ends  of  the  tunnel  the  renewals  grew  less 
and  less.  The  theory  on  which  we  worked  was  that  the  influence  of  the  air  on  the  rock 
could  only  extend  from  the  walls  of  the  tunnel  a  certain  distance  into  the  mountain  and 
the  affected  material  would  form  a  layer  beyond  which  there  would  be  no  swelling  action. 
The  swamp  land  was  composed  largely  of  vegetable  or  peaty  matter  mixed  with 
water,  with  depths  to  hard  material  of  clay  or  sand  of  as  much  as  twenty  feet.  Some  of 
the  country  had  been  leveed,  but  the  engineers  said  we  could  not  maintain  a  railroad 
bank  through  the  particular  section  we  had  selected.  We  succeeded,  however,  in  spite  of 
these  predictions.  Our  method  was  to  use  long-arm  clamshell  dredges  and,  starting  with 
a  base  one  hundred  feet  wide,  place  a  layer  of  the  peaty  material  and  allow  this  to  dry 
for  a  number  of  weeks.  On  this  we  placed  a  layer  of  sand  or  clay  from  the  hard  bottom 
of  our  borrow  pits  and  allowed  this  to  dry,  next  was  placed  a  layer  of  peat  and  then 
hard  material  and  so  on  until  we  reached  the  proper  height.  The  last  layer  was  hard 
material  and  when  this  was  dry  we  shaped  it  with  scrapers  and  horses.  We  did  have 
some  bad  slips  back  into  the  borrow  pits,  and  slips  of  this  sort  were  what  made  the  levee 
engineers  doubtful  of  our  success.  We,  however,  drove  temporary  trestles  in  these  places 
and  later,  when  the  track  was  laid,  hauled  in  and  filled  with  sand,  of  which  there  was 
plenty  about  fifteen  miles  away. 

About  three  years  after  we  began  this  work  the  Santa  Fe  bought  the  stock  of  the 
company  and  made  arrangements  to  use  the  Southern  Pacific  from  the  south  end  of  our 
line  at  Bakersfield  to  Mojave,  thus  giving  the  Santa  Fe  an  outlet  to  San  Francisco  and 
furnish  a  new  overland  route  from  that  point.  We  were  instructed  to  complete  the  road 
according  to  our  plans,  which  we  did,  building  floats  to  transfer  cars  from  the  east  side 
of  the  bay  at  Point  Richmond  to  San  Francisco,  tugs  to  handle  the  floats,  ferry  boats 
to  transfer  passengers,  wharves  and  slips  to  enable  transfers  to  be  made.  In  July,  1900, 
the  road  was  turned  over  to  the  operating  department  of  the  Santa  Fe. 

My  experience  on  the  construction  of  the  Valley  Road,  as  it  was  called,  was  of  great 
value  to  me  as  it  brought  me  into  contact  with  all  elements  of  railroad  work — the  con- 
struction, the  accounting  and  the  operation.  We  had  a  secretary  who  kept  all  the  books, 
while  I  passed  on  all  vouchers,  supervised  the  preparation  of  all  plans,  both  for  bridges 
and  buildings,  and  let  all  contracts.  In  a  large  corporation  all  these  are  handled  by 
separate  departments  and  one  department  knows  little  about  the  work  of  any  other, 
while  with  our  small  road  all  departments  were  united  in  the  secretary  and  myself. 

Upon  turning  the  road  over  to  the  operating  department  of  the  Santa  Fe  I  was 
offered  the  position  of  chief  engineer  of  its  Eastern  Lines,  with  headquarters  in  Topeka. 
The  Eastern  Lines  at  that  time  included  all  territory  east  of  the  Rio  Grande,  or  what  is 
now  included  in  the  Eastern  and  Western  lines.  It  did  not  include  the  Gulf,  Colorado 
&  Santa  Fe,  as  this  is  a  Texas  corporation  and  handled  separately.  I  remained  in  this 
position  for  six  years  or  until  the  middle  of  1906,  except  that  I  was  given  leave  of 
absence  of  one  year— 1903-1904 — to  make  investigation  relative  to  possible  railroad  routes 
in  California  between  San  Francisco  bay  and  Eureka  in  Humboldt  county. 

The  Santa  Fe  and  the  Southern  Pacific  had  clashed  in  trying  to  get  into  this  red- 
wood country,  the  former  having  acquired  an  existing  road  from  Eureka  south  for  about 
fifty  miles  and  the  latter  another  existing  road,  from  the  bay  north  and  access  to  the  Eal 
river,  down  which  it  began  surveys  and  announced  the  intention  of  building.  I  made 
various  surveys  and  estimates  and  finally  reported  that  in  my  judgment  two  separate 


268  Memoirs ^__ 

railroads  through  the  country  could  not  be  supported,  and  suggested  that  the  companies 
form  a  joint  company,  build  one  road  to  connect  the  two  existing  roads  and  operate  the 
whole  for  the  joint  benefit.  This  plan  was  followed  and  the  Northwestern  Pacific  was 
formed;  it  took  over  the  two  existing  roads  and  finally,  when  the  new  construction  was 
completed,  operated  the  entire  property. 

I  then  came  back  to  the  Eastern  Lines  and  resumed  work  there.  During  my  term 
as  chief  engineer  we  put  in  many  permanent  masonry  structures  in  the  shape  of  piers  and 
abutments  for  bridges  on  the  Chicago-Kansas  City  line,  cut  down  the  grades  on  the  line 
as  far  west  as  La  Junta  to  a  0.4  percent  basis,  built  a  number  of  branch  lines,  double 
tracked  and  reduced  grades  on  the  cut-off  between  Holliday  and  Emporia,  enlarged  the 
Argentine  and  Emporia  yards  and  erected  the  Argentine  and  Chicago  elevators. 

During  this  period  we  had  a  very  severe  flood  at  Kansas  City  and  a  flood  on  the 
western  territory  between  Byron,  Colorado  and  El  Paso,  Texas,  which  took  out  the 
bridges  over  nearly  all  main  streams  and  necessitated  building  new  bridges  and  making 
certain  changes  of  line.  It  was  altogether  a  very  busy  period  in  the  task  of  improving 
and  modernizing  the  road. 

In  July,  1906,  I  was  made  chief  engineer  of  the  Santa  Fe  System,  with  headquarters 
in  Chicago,  having  charge  of  all  new  construction  and  acting  in  a  consulting  capacity 
on  all  maintenance  work,  which  was  in  direct  charge  of  the  chief  engineers  of  the  several 
parts  of  the  System. 

When  I  assumed  this  office  the  so-called  Belen  cut-off  from  the  New  Mexico-Texas 
line  to  the  Rio  Grande  river  at  Belen  and  to  a  junction  with  the  main  line  at  Rio  Puerco 
had  been  located  and  about  half  completed.  I  completed  this  and  took  up  the  work  of 
reducing  the  grades  on  the  Hne  from  Mulvane  in  Kansas  to  and  through  the  panhandle 
of  Texas  to  a  connection  with  the  Belen  cut-off  to  a  0.6  percent  basis,  the  cut-off  having 
been  built  on  the  same  limiting  grades.  This  line  had  originally  been  built  as  a  cattle 
Hne  and  on  a  1  percent  basis  with  5  deg.  maximum  curves.  We  reduced  the  curvature  to 
3  deg.  Later,  when  the  second  track  was  built  from  the  junction  of  the  cut-off  with  the 
main  line  over  the  transcontinental  divide  in  New  Mexico,  we  put  this  on  a  0.6  percent 
basis,  leaving  the  old  line  on  a  1  percent  basis  as  the  downhill  grade.  We  thus  estab- 
lished a  ruling  0.6  percent  grade  from  the  Missouri  river  to  the  station  at  Winslow,  Ariz., 
except  for  two  or  three  short  stretches  of  pusher  grade.  We  then  constructed  a  connecting 
line  between  this  new  overland  route  and  our  Gulf  lines,  and  succeeded  in  getting  a  0.6 
percent  Hne  aU  the  way  from  the  junction  point  at  Texico  to  the  junction  with  the  Gulf 
Unes  at  Coleman,  and  part  of  this,  that  from  Texico  to  Slaton,  a  distance  of  105  miles, 
on  a  0.4  percent  basis.  In  doing  this  we  had  to  miss  Abilene,  one  of  the  most  important 
centers  in  that  section,  but  the  0.6  percent  Hne  for  through  traffic  was  deemed  of  greater 
importance. 

In  addition  we  built  many  branches  in  the  panhandle  of  Texas,  thus  opening  up 
that  country  for  agriculture.  When  we  first  began  operations  there  it  was  entirely  a 
grazing  country  and  today  it  is  covered  with  farms.  When  we  opened  the  first  Hne 
across  this  territory  not  a  single  car  of  wheat  was  shipped.  Since  then,  in  a  good  year, 
as  much  as  60  milUon  bushels  has  been  sent  out.  In  addition  they  raise  large  amounts 
of  row  crops  and  cotton.  There  have  been  also  extensive  oil  fields  developed,  and  while 
the  crude  oil  goes  out  by  pipe  Hne  there  is  a  large  tonnage  of  lampblack  which  moves 
by  rail. 

I  was  made  vice-president  in  charge  of  construction  in  1909  and  in  1910  I  was 
assigned  the  operating  department  in  addition  to  the  construction.  Then  followed  two 
very  busy  years,  since  it  was  necessary  to  read  each  file  from  bottom  to  top  whenever  a 
new  subject  came  before  me. 


Memoirs 269 

I  served  as  vice-president  until  the  end  of  1917  when,  our  country  then  having 
become  involved  in  the  World  War,  the  government  took  over  the  railroads  and  I  was 
made  federal  manager  of  the  Santa  Fe. 

The  roads,  due  to  the  sudden  increase  in  freight  to  be  transferred,  became  badly 
congested  and  in  an  attempt  to  operate  them  as  a  unified  whole  a  small  committee  was 
formed  to  which  all  roads  became  subordinate.  The  attorney  general  of  the  United  States 
issued  notice  that  if  this  committee  acted  it  would  be  in  violation  of  the  anti-trust  laws 
and  that  he  would  have  to  prosecute  them.  To  meet  this  difficulty  Congress  could  have, 
as  a  war  measure,  suspended  the  act  so  far  as  it  applied  to  railroads  for  the  duration  of 
the  war,  but  the  President  solved  it  by  taking  over  the  railroads  and  placing  their 
operation  in  the  hands  of  one  man.  He  selected  for  this  assignment  Mr.  W.  G.  McAdoo, 
the  secretary  of  the  treasury.  Although  the  Armistice,  which  really  ended  the  war,  came 
in  November,  1918,  the  government  retained  possession  until  March  1,  1920,  which  date 
was  fixed  by  Congress.  During  the  period  of  government  control  the  properties  were  en- 
tirely separated  from  the  corporations  that  owned  them,  but  on  the  passage  of  the  Act 
fixing  the  date  for  return  of  the  roads  the  corporations  began  to  prepare  to  receive  them 
by  arranging  the  personnel  to  handle  them.  The  president  of  the  Santa  Fe  decided  to 
retire,  and  I  was  elected  to  succeed  him  and  took  office  on  January  1,  1920 — resigning 
as  federal  manager  on  that  date. 

Under  federal  control  the  morale  of  the  organization  had  suffered  greatly  and  the 
roads  became  badly  disorganized.  The  Santa  Fe  forces  had  been  completely  unionized, 
whereas  we  had  contracts  only  with  the  train  and  enginemen  brotherhoods  at  the  time 
the  roads  were  taken  over.  In  1922  a  nationwide  strike  of  the  shop  crafts  occurred  that 
seriously  affected  all  the  roads,  but  the  Santa  Fe  overcame  this  by  hiring  new  men, 
placing  them  under  instructors,  and  in  a  few  weeks  were  able  to  operate  satisfactorily. 
Many  other  roads  that  did  not  pursue  this  method  had  much  more  trouble  and  finally 
made  new  contracts  with  the  unions.  After  things  were  again  running  smoothly  with  us 
I  asked  the  men  to  organize  a  Santa  Fe  union,  feeling  that  if  they  had  grievances  they 
should  have  some  way  to  deal  with  the  authorities  over  them.  This  plan  worked  well 
during  my  entire  encumbency.  From  1920  to  1929  the  business  of  the  road  increased  and 
the  net  earnings  went  up  from  52  to  nearly  74  millions,  the  dividends  on  the  common 
stock  were  increased  from  6  percent,  which  had  been  paid  for  many  years,  to  10  percent, 
and  the  surplus  increased  from  87  millions  in  1920  to  314  millions  in  1929.  We  had  in- 
creased the  mileage  by  over  a  thousand  miles  by  the  purchase  of  the  Kansas  City, 
Mexico  &  Orient,  and  by  building  new  branches  and  extensions.  The  entire  business  of 
the  country  was  booming,  production  was  heavy,  building  was  active.  In  1929,  however, 
earnings  began  to  decline  and  in  1932  amounted  to  only  20  millions,  dividends  had  to  be 
cut  and  in  the  following  year  omitted  entirely  on  the  common  stock.  Inasmuch  as  I  had 
reached  the  age  of  seventy-five  and  no  immediate  recovery  was  in  sight,  I  signified  to 
the  board  of  directors  that  I  thought  it  wise  for  me  to  retire.  The  board  therefore  elected 
my  successor  at  the  reorganization  meeting  in  May,  1933.  I  remained,  however,  as  a 
member  of  the  board  and  of  the  executive  committee. 

In  the  following  year  (1934)  I  was  asked  by  the  Secretary  of  the  Interior  to  be  a 
member  of  a  board  of  review  to  pass  on  the  plans  of  the  Chicago  Sanitary  District  for 
purification  of  sewage.  A  grant  of  money  and  a  purchase  of  bonds  had  been  arranged 
with  the  government,  subject  to  its  approval  of  the  plans.  This  board  spent  several 
months  in  reviewing  these  plans,  and  on  completion  of  this  assignment  we  were  asked  to 
continue  as  a  board  to  pass  on  any  changes  that  might  become  necessary  as  the  con- 
struction progressed.  We  hold  meetings  three  or  four  times  a  year  for  this  purpose  but 
the  work  is  expected  to  be  completed  this  year. 


270 Memoirs 

In  1889  I  was  made  a  member  of  the  American  Society  of  Civil  Engineers,  in  1906 
was  elected  a  director,  and  in  1924  became  a  life  member.  I  became  a  charter  member 
of  the  American  Railway  Engineering  Association,  was  elected  a  director  in  1911,  second 
vice-president  in  1912,  first  vice-president  in  1913  and  president  in  1914.  I  was  made  an 
honorary  member  in  1938.  I  was  elected  a  member  of  the  Western  Society  of  Engineers 
in  1907  and  became  a  life  member  in  1937.  I  am  also  a  life  member  of  the  American 
Society  for  Testing  Materials.  In  1910  I  was  elected  to  the  honor  societies  of  Phi  Beta 
Kappa  and  Sigma  Xi  of  the  University  of  California  and  in  1924  was  given  the  honorary 
degree  of  LL.D.  by  my  Alma  Mater.  In  1924  I  was  elected  a  trustee  of  the  Carnegie 
Institution  of  Washington. 


INDEX 


Agreement  for  commercial  signs,  39 
— for  unloading  liquefied  petroleum,  41 
American  Lumber  Standards,  248,  262 
Asphalt  for  waterproofing,  353 

B 

Ballast,  form  of  records,  380 

Ballast  section,  571 

— asphalt  in,  571 

— stone  ballast  specifications,  572 

Blaess,  A.  F.,  a  memoir,  640 

Boiler,  corrosion,  96 

— lubricating  oil  in,  101   (a) 

— silica  in  water,  101  (b) 

Bolts,  tension  in,  608 

Bond,  F.  L.  C,  address  of,  769 

Borings,  test,  specifications  for,  321 

Breakwaters,  88 

Bridge  maintenance  gangs,  217 

Bridges,  steel,  specifications,  356 

— instructions  for  inspection,  358 

— non-ballast  metal  floors,  363 

— wood,  fireproofing,  291 

Brine  drippings,  628 

Buford,  C.  H.,  address  of,  775 

Building  maintenance  gangs,  217 

Buildings,  report,  225,  875 

Bulkheads,  88 


Cars,  motor,  accessories  for,  174 

Car  Service  Division,  45 

Cements,  five  ASTM  types,  305,  310 

— progress  in  manufacture  and  testing,  310 

— properties  and  behavior,  335 

Central   of   Georgia  maintenance   methods, 

214 
Colleges,  see  Universities 
Columns,  composite,  and  pipe,  298 
Committee  reports,  rules  for  preparation,  20 
Concrete,  see  also  Cement,  Masonry 
— durability,  335 
— specifications,  321 
— specifications  for  under  water,  332 
Cooperative    Relations    with    Universities, 

report,  155,  815 
Corrosion 
— boilers,  96 

— cathodic  protection  of  tanks,  97 
— effect  of  brine  drippings,  628 
— fence  wire,  566 

— preservatives  for  rails  and  fastenings,  177 
— rails  in  tunnels,  605 


Crossings,  highway,  specifications  for,  150 

— location  of  signals,  152 

— protection  of  flangeways,  152 

— types  of  protection,  151 

Crossings,  railway,  plans,  595 

Culvert  pipe,  specifications  for  placing,  315 

— pipe  line  crossings,  555 

— specifications  for  clay  pipe,  546 

Curve,  lubrication,  626 

— spirals  for  high  speed  operation,  636 


Definitions,  for  wood  and  lumber,  253 
Denver  &  Rio  Grande  Western,  rail  studies, 

755,  759 
Diesel  locomotive  facilities,  128 
Downs,  L.  A.,  a  memoir,  m255 
Drafting  room  practice,  373 
Drainage,  economies  obtained,  219  ^ 

Drawings,  methods  of  filing,  375 

E 

Economics  of  Railway  Labor,  report,  213, 
823 

— maintenance  of  way  mechanization,  ml 

— railroad  carrier  industry  committee,  tes- 
timony, ml 

Economics  of  Railway  Location  and  Opera- 
tion, report,  44,  804 

Education,  value  of,  157 

Election  of  officers,  780 

Electric  Locomotives 

— characteristics,  ml42 

— stresses  and  depressions  in  rail,  ml 55 

Electrical  Section  activities,  29 

Electricity,  report  of,  28,  810 

— use  of,  28 

Electrification,  in  Central  and  South 
America,  68 

Embankments,  placing  material,  561 

— settlement  of,  559 

Employees,  young  college  men,  157 

Expenses,  operating,  relation  to  traffic,  50 

— effect  of  high  speed,  56 


Fanning,  George  Stokes,  a  memoir,  m248 

Faries,  Robert,  a  memoir,  m253,  640 

Fence,  corrosion-resisting  wire,  566 

— electrified,  569 

—wood  post  specifications,  567 

Fireproofing  wood  bridges,  291 

Fire  Protection  Section,  activities,  106 

"Flat  Work"  maintenance  method,  214 


Note — Page  numbers  preceded  by 
Report  Section  of  this  volume. 


'm"  refer  to  pages  in  (he  Monograph,  or  Special 


Index 


Ford,  C.  F.,  a  memoir,  490 

Foundations,  specifications  for  test  borings, 

321 
— properties  of  earth  materials,  541 
Frogs,  plans,  595 


Gangs,  combined,  versus  separate,  217 

Garage  buildings,  225 

Grading  equipment,  206 

Grading  rules  for  timber  and  lumber,  252, 

273 
Grouting  specifications,  319 

H 

Highways,  report,  149,  814 

— crossing,  see  Crossings,  highway 

— truck,  terminals  for  loading  on  cars,  136 


Illinois  Central,  web  stresses  in  rail,  759 
Impact,  report,  393,  871 
Irfterstate  Commerce  Commission  develop- 
ments, 379 
— changes  in  accounting  classification,  382 
— methods  of  procedure,  386 
— valuation  orders,  381 
Iron  and  Steel  Structures,  report,  355,  874 
Irwin,  J.  C,  a  memoir,  37 


Jetties,  88 

Joint  bars,  effect  of  speed,  m201 
— failures,  666 

— photoelastic  studies,  666,  672 
— tests  of,  ml  76,  662 
— types  and  conditions,  ml 94 
— vertical  and  longitudinal  movements, 
m204 


Lea,  Clarence  F.,  address  of,  782 
Locomotives,     see,     Electric,     Steam,     and 
Diesel  (locomotives) 

M 

Maintenance    of    Way    Work    Equipment, 

report,  173,  826 
Manual,  rules  for  publication,  23 
Masonry,  report,  295,  878 
Memoirs: 

— Blaess,  August  F.,  640 
— Downs,  Lawrence  Aloysius,  m255 
— Fanning,  George  Stokes,  m248 
— Faries,  Robert,  m2S3,  640 
—Ford,  Charles  Finley,  490 
— Irwin,  James  C,  37 
— Neubert,  John  V.,  m251,  640 
• — Storey,  William  Benson,  m260 
—Weymouth,  Albert  Pierce,  370 
Moore,  H.  F.,  Seventh  Progress  Report,  681 


N 
Neubert,  John  V.,  a  memoir,  m251,  640 


Oiling  rail,  methods  and  equipment,  177 
Oscillographs,  ml 50 


Paints,  protective  value  of,  227 

Passenger  cars,  terminal  facilities  for 
streamlined,  110 

— electric  and  air  conditioning  facilities, 
112 

— washing  facilities,  134 

Passing  track,  108 

Pennsylvania  Railroad,  impact  tests,  397 

Petroleum,  liquefied,  agreement  for  unload- 
ing, 41 

Photoelastic  studies,  666,  672 

Piers,  casings  for,  88,  90 

Pile  drivers,  capacity,  282 

Piles,  wood,  bearing  power,  282 

Pipe,  see  Culvert  pipe 

Pipe  line  crossings,  555 

Posts,  specifications,  567 

R 

Rail,  batter  in  rail  surface,  m222,  658 

— continuous  welding,  660 

— controlled  cooled  and  Brunorized,  656 

— controlled  cooling  studies,  702 

— corrosion  in  tunnels,  605 

— drop  and  bend  test,  747 

— effect  of  flat  wheels,  m217 

— failure  statistics,  645,  650,  656 

— fastenings  for  continuous  welded,  580 

— fissure  failures,  650,  681 

— lubrication  of,  626 

— mechanical  properties  of,  726 

— metallographic  structure,  719 

— record  forms  for  rail  failures,  641 

— rolling  load  test,  687 

— service  records,  696 

— shatter  cracks,  702,  743 

— specifications  for  laying,  633 

— -value  of  different  sizes,  659 

— vertical  web  stresses  in  112-lb.,  755,  759 

— wheel  loads  on,  692 

Rail,  report,  639,  850 

Rail  joints,  see  also  Joint  bars 

— behavior  under  load,  ml 73 

■ — effect  of  camber,  ml92 

Records  and  Accounts,  report,  369,  858 

— avoiding  duplication  of  reports,  385 

— bibliography,  371 

Records,  for  work  equipment,  183 

Reflex  units  for  switch  lamps,  606 

Roadway  and  Ballast,  report,  539,  831 

— ^formation  of  roadway,  559 

— signs,  design  of,  570 


< 


Index 


Rules  and  Organization,  report,  515,  864 

— for  electrified  territory,  ?i6 

— for  maintenance  of   way   and  structures 

employees,  515 
— for  signals  and  interlocking,  535 
■ — for  telegraph  and  telephone,  536 


Seawalls,  88 

Sea  water,  casings  in,  88,  90 

Secretary,  report  of,  791 

Scales,  revision  of  specifications,  109,  110 

— specifications  for  grain  hopper,  115 

Shore  protection,  88 

Siding,  108 

Signals  and  Interlocking,  report,  31,  802 

Signal  Section  activities,  31 

Signs,  design  of,  570 

— commercial,  agreement  for,  39 

SiHca,  removal  from  boilers,  101   (b) 

Speed  through  turnouts,  578 

— effect  on  expenses,  56 

Spike,  cut,  design,  577 

— screw  spike  design,  583 

Standardization,  report,  25,  802 

Steam  Locomotives,  rail  stresses  and  de- 
pressions, m232 

Storey,  Wihiam  Benson,  a  memoir,  m260 

Strain  gages,  magnetic,  ml46 

Streamlined  equipment,  facilities  for,  110 

Stresses  in  Railroad  Track,  report,  753,  759, 
848 

Switches,  plans,  595 


Talbot,  A.  N.,  address  of,  759 

—tribute  to,  848 

Tamping  track,  579 

Tanks,  cathodic  protection,  97 

Terminals,  see  also  Yards 

—facilities  for  streamlined  equipment,  110 

— for  Diesel  locomotives,  128 

— for  washing  cars,  134 

— loading  highway  trucks  on  cars,  136 

— servicthg    electric    and    air    conditioning 

equipment,  112 
Termites,  study  of,  513 
Tie  plate,  specifications,  576 
Ties,  report,  485,  845 
— adherence  to  specifications,  485 
— cost  averages,  486 
— dimensions  of,  487 
— renewal  statistics,  486 
— service  test  records,  490 


Tools,  track,  plans  for,  584 

— limits  of  wear,  584 

Trackwork  plans,  595 

Track,  report,  575,  836 

Track  structure,  relation  to  traffic,  48 

Traffic,  for  export — plan,  45 

— effect  on  operating  expenses,  SO 

— relation  to  track  structure,  48 

Train  resistance  formulas,  69 

Transportation,  study  at  universities,  171 

Treasurer,  report  of,  801 

Tunnels,  corrosion  of  rail  in,  605 

— -lighting,  565 

— specifications  for  lining,  307 

Turnouts,  table  of  speeds,  57S 

U 

Uniform   General   Contract   Forms,   report, 

37,  819 
Universities,  relations  with,  155,  815 
— graduates  in  railway  employ,  157 
— research  facilities,  170 
— study  of  transportation,  168,  171 

W 

Waterproofing  of  Railway  Structures,  re- 
port, 353,  877 

Water  Service,  Fire  Protection  and  Sanita- 
tion, report,  95,  820 

— see  also.  Boiler,  Corrosion,  Tanks 

Waterways  and  Harbors,  report,  87,  812 

Waterv/ay  openings,  formulas,  543 

Welding,  equipment  for,  200 

— rail,  continuous,  661 

Weymouth,  A.  P.,  a  memoir,  370 

Wood  Bridges  and  Trestles,  report,  247,  80S 

— specifications  for  design,  273 

Wood,  nomenclature  for,  253 

Wood  Preservation,  report,  489,  830 

Work  Equipment 

— economies  of  off-track  equipment,  221 

— economies  of  various  types,  ml 

—off-track,  206,  221 

— pneumatic  tired,  194 

— records  of,  183 

— welding,  200 

Wrenches,  impact,  199 


Yards  and  Terminals,  report,  107,  854 
— bibliography,  140 
— classification,  133 
— departure,  133 
— hump  yards,  108 


1